Loading...
HomeMy WebLinkAbout5369 Contract Number: 5369 Vendor: PARAMETRIX INC Subject: PSA - Engineering Design Services - Pavement Preservation Project Department: Engineering File Class: LEG 12-1 Begin Date: 4/14/2014 End Date: 7/31/2015 Review Date: 8/1/2015 Vault Date: 2016 Comments: Amendment No. 1 9/16/14; Supplemental Agreement No. 1 10/1/14 Re�����d SEP 3 0 2014 Parannetrix �remerton SUPPLEMENTAL AGREEMENT NO. 1 Time Extension and Revision to Scope of Work Project No. 4294 Agency City of Bremerton Name of Project Pavement Preservation Project Agreement No.: 5369 , The City of Bremerton desires to supplement the agreement entered into with Parametrix and executed on April 14, 2014. AI! provisions in the basic agreemert remain in effect except as expressly rnodi'ied b� this supplement. The changes to the agreement are described as follows: Section 2, TERM, is hereby extended to July 31, 2015. Except as herein modified, the terms of the AGREEMENT shall remain in full force and effect. In WITNESS WHEREOF, the parties hereto have executed this SUPPLEMENTAL AGREEMENT NO. 1 to the Professional Services Agreement of the date and year indicated. f�' For Parametrix dated this � � day of 0�� , 2014. gy. `�l� �� For the City of Bremerton, dated this day �� � of �d�P�2, 2014. By: DEPARTMENT PROVAL: Chal Martin, Direc r of Publi orks and U ilities APP O ED AS TO FO . / City Attorney RECEIVED F ILING: � Shannon Corin—City Clerk Close Out Change Order � ��: i��� SUMMARY -See Attached Schedule Details ;I p BLIC ,:�--�-----...__�; U WORKS 8 Ublities Engineermg Drvision j .,��`t�" �� CLOSE OUT CHANGE ORDER ���.���! Pro�ect Name�Washinqton Avenue Sewer Improvements 15-Sep-14 Contractor: Pape and Sons Construction, Inc. 5313 SCHEDULE A TAX(N/A for Schedule TOTAL ORIGINAL CONTRACT AMOUNT A) $478,174.45 $0.00 $478,174 45 SCHEDULE A NET CHANGE for TAX(NIA for CONTRACT AMOUNT ' CONTRACT AMOUNT SCHEDULE A SUBTOTAL Schedule A) AFTER THIS CHANGE ORDER $478,174.45 $33,478.83 $444,695 62 �0.00 $444,695.62 SCHEDULE B TAX(g,6%) TOTAL ORIGINAL CONTRACT AMOUNT $637,335 00 $54,810 81 $692,145.81 SCHEDULE B NET CHANGE for CONTRACT AMOUNT CONTRACT AMOUNT SCHEDULE B SUBTOTAL TAX(8.7%) AFTER THIS CHANGE ORDER ' $637,335.00 $13,593.46 $623,741.54 $54,265.51 $678,007 05 SCHEDULE C ORIGINAL CONTRACT AMOUNT T�(8•6%) TOTAL $472,029.00 $40,594.49 $512,623.49 CONTRACT AMOUNT SCHEDULE C NET CHANGE for SUBTOTAL TAX(8.7%) AFTER THIS CHANGE CONTRACT AMOUNT SCHEDULE C ORDER $472,029.00 $1 654 15 $470,374.85 $40 922.61 $511,297.46 TOTAL TAX TOTAL TOTAL ORIGINAL CONTRACT AMOUNT $1,587,538.45 $95,405.30 $1,682,943.75 PROJECT TOTAL TAX(8.7%) CONTRACT AMOUNT CONTRACTED AMOUNT NET CHANGE SUBTOTAL Sum of B 8 C AFTER THIS CHANGE Schedules ORDER $1,587,538.45 $48 726.44 $1,538,812.01 $95 188 13 $1,634,000 14 DAYS: 217 DAYS:220 All work,materials and measurements to be in accordance with the provisions of the onginal contract and/or the standard specifications and special provisions for the type of construction involved. The payments and/or additional time specified and agreed to in this order include every claim by the Contractor for any extra payment or extension of time with respect to the work descnbed herein,including delays to the overall project. 9/24/2014 Page 1 Close Out Change Order APPROVED BY: SIGNATURE: DATE• I OWNERS REPRESENTATIVE !� � /% CONTRACTOR l' �j�C///� CITY APPROVAL � � / /r CITY COUNCIL APPROVAL DATE: � 9/24I2014 Page 2 Close Out Change Order '_-, i. � II ..e�....�..e..�........e....,...e.."'.�..e�...�.. —__ � PUBLIC WORKS 8 Utilities Engineering Division ,'�_ CLOSE OUT CHANGE ORDER-SCHEDULE A Pro�ect Name Washinpton Avenue Sewer Improvements Date 15-Sep-74 Contractor.Pape and Sons Construction,Inc Contract No 5a1a DESCRIPTION OF CHANGE You are hereb re uested to com I with the followin chan es from the contract Plans and s ecifications. Such work will be compensated by check one or more of the following as applicable[X]Increase or[X]Decrease in bid items,[]Force Account X Ne otiated Price The described work affects the existin contract items and/or adds and/or deletes bid items as follows Bid Item Descrl tlon A-1 Minor Changes and Force Account-was under the estimated quantity As such a credit of$21,807.87 is needed to close the contract A-5 Pothole Existing Utdiry-was not needed for this Schedule A work. As such a credit of$1,250 00 is needed to Gose the contract A-8 Cement Concrete Sidwalk and Dnveway Removal-total square yards was more than anticipated As such line rtem A-8 needs to increased by 10 square yards or$50 00 A-11 Adjust Existing Utilities to Grade-Additional ad�ustments was more than antiapated As such line item A-11 needs to increased by 2 additional ad�ustments or$600 00 A-14 Contaminated Material Excavation Inc Haul-total tonnage(TN)was less than the estimated quantity. As such a credit of 393 3 tons or$23,598 00 is needed to close the contract A-15 Contaminated Water Handling and Disposal-was under the estimated quantity As such a credit of$20,000 00 is needed to close the contract A-17 Crushed Surfaang Top Course-total tonnage(TN)was more than anticipated As such I�ne item A-17 needs to increased by 802.91 tons or$23,284 39 A-18 Cold Mix-total tonnage(TN)was less than the estimated quantity As such a credit of 70 tons or$8,750.00 is needed to close the contract A-19 HMA CL 1/2"PG 64-22-total tonnage was more than anticipated As such line item A-19 needs to increased by 30 31 tons or$3,182 55 A-20 Cement Concrete Pavement-total cubic yards was more than anticipated As such Ime item A-20 needs to increased by 14 cubic yards or$3,850.00 A-21 Solid Wall PVC Storm Sewer Pipe,6-inch Diam-total linear feet was slightly more than anticipated. As such Ime item A-21 needs to increased by.6 LF or$43.80 A-22 Solid Wall PVC Storm Sewer Pipe,8-inch Diam-total linear feet was more than antiapated As such line item A-22 needs to increased by 51 LF or$3,187 80 A-23 Catch Basin Type 1-total catch basins needed were slightly more than antiapated As such line item A-22 needs to increased by 1 EA or$1,150 00 A-24 CDF Backfill-was not needed for this Schedule A work As such a credit of$900 00 is needed to close the contract A-27 Cement Concrete Curb and Gutter-Type A-total linear feet(LF)was more than antiapated. As such line item A-27 needs to increased by 408 LF or 58,760 00 A-28 Cement Concrete Curb-Type C1-total linear feet(LF)needed were slightly more than anticipated As such line rtem A-28 needs to increased by S LF or$156.00. A 29 Cement Concrete Dnveway Approach Type III-total square yards(SY)needed were more than anticipated As such line item A-29 needs to increased by 17 SY or $1,275 00 A-30 Survey Monument-total monuments was less than the estimated quantity As such a credit of 3 monuments or$2,400.00 is needed to close the contract A-31 Cement Concrete Sidewalk-total square yards(SY)needed were more than antiapated As such line item A-30 needs to increased by 10 SY or$287 50 snarzoia Page 3 Close Out Change Order Item No Descripuon FO#NVCD# � � � oty Unn 5 Cost Pe�Unit S Cost Nel E Cost Ae�Days MINOR CHANGES AND FORCE Ori 1 EST $40,000.00 $40,000 00 � A� ACCOUNT See WCD Rev 1 EST $18,192 13 $78,192 13 ($21,807.87) 0 2 A-2 MOBILIZATION ri 1 LS 61,000.00 $61,000 00 •' Rev. 1 LS $61,000 00 $61,000 00 $0 00 0 3 A-3 PROJECT TEMPORARY TRAFFIC Ori 1 LS $8,500 00 $8,500 00: .. :: CONTROL Rev 7 LS $8,500.00 $8,500 00 $0 00 0 4 A-4 REMOVAL OF STRUCTURES AND Ori 1 LS 52,250 00 $2,250.00 OBSTRUCTIONS Rev 1 LS 52,250 00 $2,250 00 $0 00 0 5 A-5 POTHOLE EXISTING UTILITY Ori 10 EA $125.00 $1,250 00. Rev 0 EA $125 00 $0 00 ($1,250.00) 0 6 A-6 ASPHALT CONCRETE PAVEMENT Ori . 1,113 SY $6 50 $7,234 50: REMOVAL Rev 1113 SY $6 50 $7,234 50 $0 00 0 � A� CEMENT CONCRETE PAVEMENT WCD 013 Ori 2,218 SY $8.00 $17,744 00 REMOVAL Rev 2218 SY $8 00 $17,744 00 $0 00 0 8 A-8 CEMENT CONCRETE SIDEWALK AND Ori 547 SY $5 00 $2,735 00 DRIVEWAY REMOVAL Rev 557 SY $5 00 $2,785 00 $50 00 0 9 A-9 CEMENT CONCRETE CURB AND Ori 1,686 LF $1.50 $2,529 00 GUTTER REMOVAL Rev 1686 LF $1 50 $2,529 00 $0 00 0 10 A-10 REMOVEIABANDON STORM SYSTEM Ori 1 LS $2,500 00 $2,500 00. Rev. 1 LS $2,500.00 $2,500 00 $0 00 . 0 �� A�� ADJUST EXISTING UTILITIES TO On 5 EA $300 00 $1,500 00 GRADE Rev. 7 EA $300 00 $2,100 00 $600 00 0 12 A-12 ROADWAY EXCAVATION INCL HAUL Ori 876 CY $18.00 $15,768 00. Rev 876 CY $18.00 $15,768 00 $0 00 0 13 A-13 SHORING OR EXTRA EXCAVATION Ori 1 LS $1,000.00 $1,000 00 ' CLASS B Rev 7 LS $1,000.00 $1,000 00 $0.00 0 14 q_�q CONTAMINATED MATERIAL On 750 TN $60 00 $45,000 00. EXCAVATION INCL HAUL Rev 356 7 TN 360.00 $21,402 00 ($23,598 00) 0 15 A_15 CONTAMINATED WATER HANDLING Ori 1 FA $20,000 00 $20,000 00 • AND DISPOSAL Rev 0 FA $20,000.00 $0 00 ($20,000 00) 0 16 A-16 GEOGRID REINFORCEMENT On 2,813 SY $3 40 $9,564 20. Rev. 2813 SY $3.40 $9,564 20 $0 00 0 Ori 1,467 TN $29 00 $42,543 00'... "' ' 17 A-17 CRUSHED SURFACING TOP COURSE Rev 2269 91 TN $29 00 $65,827 39 $23,284 39 0 18 A-18 COLD MIX ri 70 TN $125 00 $8,750 00... ... ; Rev 0 TN $125.00 $0 00 ($8,750 00) 0 19 A-19 HMA CL 1/2"PG 64-22 Ori . 542 TN $105 00 $56,910 00. � ' ' Rev 572 31 TN $105 00 $60,092 55 $3,182 55 0 20 A-20 CEMENT CONCRETE PAVEMENT WCD 013 ri 21 CY 275.00 $5,775 00 • ;... Rev 35 CY $275 00 $9,625 00 $3,850 00 0 2� A 2� SOLID WALL PVC STORM SEWER Ori 18 LF $73 00 $1,314 00;..• PIPE,6 IN DIAM Rev 18 6 LF S73 00 $1,357 80 $43 80 0 SOLID WALL PVC STORM SEWER Ori 383 LF $63 00 $24,129 00 ZZ A�ZZ PIPE,8 IN.DIAM. WCD 076 Rev 434 LF $63 00 $27,316 80 $3,187 80 0 23 A-23 CATCH BASIN TYPE 1 WCD 016 Ori 13 EA $1,150 00 514,950 00 .' Rev 14 EA $1,150 00 $16,100 00 $1,150 00 0 24 A-24 CDF BACKFILL On 10 CY $90 00 $900 00; Rev 0 CY $90 00 $0 00 ($900 00) 0 25 A-25 EROSIONIWATER POLLUTION Ori 1 LS $7,500 00 $7,500 00: � CONTROL Rev 1 LS $7,500 00 $7,500.00 $0 00 0 26 A-26 LANDSCAPE REPAIR WCD 015 Ori 1 LS $2,250 00 $2,250 00 ' Rev 1 LS $2.250 00 $2,250.00 $0 00 0 CEMENT CONCRETE CURB AND Ori 856 LF $20 00 $17,120 00 Z� A-2� GUTTER-TYPE A W����� Rev. 1264 LF $20.00 $25,280 00 $8,160 00 0 28 A-28 CEMENT CONCRETE CURB-TYPE Ori 830 LF $19 50 $16,185.00 �1 Rev 83B LF $19 50 $16,341.00 $156 00 0 29 A Z9 CEMENT CONCRETE DRIVEWAY On 17 SY $75 00 $1,275 00 APPROACH TYPE III Rev. 34 SY $75.00 $2,550 00 $1,275 00 0 30 A-30 SURVEY MONUMENT On 8 EA $800 00 $6,400 00: Rev 5 EA $800 00 $4,000.00 ($2,400 00) 0 31 A-31 CEMENT CONCRETE SIDEWALK WCD 017 On 473 SY S28 75 $13,598 75; , Rev 483 SY $28 75 $13,886 25 $287.50 0 32 A-32 CEMENT CONCRETE On 3 EA $7,250 00 $3,750.00 ' PERPENDICULAR RAMP Rev 3 EA $1,250 00 $3,750 00 $0.00 0 33 A-33 CEMENT CONCRETE PARALLEL Ori 3 EA $1,500 00 $4,500 00::. ....'. `' .: :•• `.: CURB RAMP Rev 3 EA $1,500 00 $4,500 00 $0 00 0 34 A-34 CEMENT CONCRETE COMBINATION Ori 3 EA $2,000 00 $6,000 00: " CURB RAMP Rev 3 EA $2,000 00 $6,000 00 $0 00 0 35 A-35 PAVEMENT MARKING Ori 1 LS $5,750.00 $5,750.00: Rev 1 00 LS $5,750.00 $5,750.00 $0 00 0 $444,695.62 ($33,478 83) SCHEDULE A TAX(8.6%) TOTAL ORIGINAL CONTRACT AMOUNT $478,774.45 $0 00 $478,174 45 snanoia Page 4 Close Out Change Order �� ....,....�......�......s...,,..o...........e..��.. � � I I �J PUBLIC WORKS&UGlities Engineering Division ' :,'� : CLOSE OUT CHANGE ORDER•SCHEDULE B Pro�ecl Name�Washington Avenue Sewer Improvements Date 75-Sep-14 Contractor Pape and Sons Construction,Inc Concreci No 5373 DESCRIPTION OF CHANGE You are hereb re uested to com I wdh the followin chan es from the contract Plans and s eufications Such work will be compensated by check one or more of the following as applicable[X]Increase or�X]Decrease in bid items;[]Force Account, X Ne otiated Price. The described work affects the existin contrad dems andlor adds andlor deletes bid items as follows Bid Item Descn tion B-1 Minor Changes and Force Account-was under the estimated quantity As such a cred�t of$22,269 03 is needed to close the contrad B-5 Cement Concrete Pavement-total square yards(SY)was more than antiapated. As such line item B-5 needs to increased by 1801 square yards or$8,010 00 B-6 Cement Concrete Pavement Removal-total square yards(SY)was less than the estimated quantity As such a credit of 53 SY or$265 00 is needed to close the contract. . B-8 Pothole Existing Utility-was less than the estimated quanity As such a credd oi$875 00 is needed to close the contract 8-10 Cold Mix-total tonnage(TN)was not used on this Schedule B work As such a credit of 70 tons or$8,750 00 is needed to close the contrad B-11 Cement Concrete Pavement-total cubic yards was more ihan anticipated As such line item 8-11 needs to increased by 87 5 cubic yards or$24,062 50 B-12 Manhole 34-inch Diameter,shallow-was less than the estimated quantity As such a credd of 1 each or$2,900 00 is needed to Gose the contract. B�5 Unswtable Pipe Foundation Excavation Including Haul-total cubic yards was more than anticipated As such line ilem B-15 needs to increased by 92 22 cubic yards or$4,611 00 B-16 CDF Backfill-was not needed for this Schedule B work As such a credit of$1,700 00 is needed to close the contracl. B�� PVC San�tary Sewer Pipe 8-in Diameter-total linear feet(LF)was less than the estimated quantity As such a credd of 5 8 LF or$365.40 is needed to close the contract B-18 C900 PVC Sanrtary Sewer Pipe 6-in Diameter-total linear feet(LF)was slightly less than the estimated quantity. As such a credit of 1 LF or$150.00 is needed to close the contrad B-19 C900 PVC Sanitary Sewer Pipe 8-in Diameter-total linear feet(LF)was more than anticipated As such line item 8-19 needs to increased by 18 5 LF or$1,202 50 B-20 PE Sewer Pipe 10-in Diameter-total linear teet(LF)was slightly more than the estimated quantity As such line item B-20 needs to increased by 1 LF or$112 00 8-21 PE LPS Mam 4-in Diameter-total linear feet(LF)was more than the es6mated quantdy As such line item 8-21 needs to increased by 10 LF or$255 00 B-23 Slip Lining 4-in Diameter-total linear feet(LF)was more than the estimated quantdy As such line dem 8-23 needs to increased by 26 LF or$468 00 8-24 PVC Sanitary Sewer Lateral Pipe,4-inch Diam-total linear feet(LF)was more than anticipated As such Ime rtem 8-24 needs to increased by 174 LF or$3,306 00 B-25 PVC Sanitary Sewer Lateral Pipe,6-inch Diam-total linear feet(LF)was more than anticipated. As such line Aem B-25 needs to increased by 57 2 LF or$1,086 80. 8-26 PVC Sanitary Sewer Lateral Pipe,6-inch Diam-total linear feet(LF)was more than anticipated As such line item B-26 needs to increased by 96 LF or$5,280.00 B-27 PE LPS Lateral 1 1/4 inch Diameter-total linear feet(LF)was more than the esdmated quantity As such line item 8-27 needs to increased by 179 LF or$1,253.00 B-28 Single LPS Lateral Service Connection 1 1l4 inch Diameter-total connections were slightly more than the estimated quantdy As such line rtem B-28 needs to increased by 1 each or$2,600.00 8 31 Simplex Gnnder Pump Assembly,complete-total grinder pumps were slightly more ihan antiapated As such line item B-31 need to be increase by 1 eaeh or 1 $10,000 00 3-33 Eledncal Panel upgrade and�nnnng-total force account was less than the estimated quantdy. As such a credd of$29,903.10 is needed to close the contract � � \ Cement Concrete Sidewalk-total square yards(SY)was less than the estimated quantdy As such a cred'A oi 149 SY or$5,103.25 is needed to close the contrad 14 Page 5 / Close Out Change Order B-36 Landscape Repair-Gnnder Pumps-total force account was less than the estimated quantity As such a credit of$3,559.48 is needed to close the contract Item No DescnpVon FOp/WCD# � Ory Un:l $Cost Per Unit S Cost Net 5 Cast Ad�Days MINOR CHANGES AND FORCE Ori 1 EST $50,000.00 $50,000 00 .... � B� ACCOUNT Rev 1 EST $27.730 97 $27,730 97 ($22,269 03) 0 2 B-2 MOBIIIZATION �� � LS $14,500 00 $�4,500 00 Rev 1 LS $14,500.00 $14,500 00 $0.00 0 3 B-3 PROJECT TEMPORARY TRAFFIC pri 1 LS 53,750.00 $3,750.00 CONTROL Rev 1 LS $3,750 00 $3,750 00 $0 00 0 4 g_q REMOVAL OF STRUCTURES AND On 1 LS $2,500 00 $2,500 00 • OBSTRUCTIONS Rev 1 LS $2,500 00 52,500 00 $0 00 0 5 B-5 CEMENT CONCRETE PAVEMENT Ori 331 SY $10 00 $3,310 00 REMOVAL Rev 1132 SY 510 00 $11,320 00 $8,010 00 0 6 B_6 CEMENT CONCRETE PAVEMENT On 240 SY $5 00 $1,200 00 . REMOVAL Rev 187 SY $5 00 $935 00 ($265 00) 0 7 B-7 REMOVEIABANDON SEWER SYSTEM �� � LS $3,000 00 $3,000 00 Rev 1 LS $3,000 00 $3,000 00 $0 00 0 8 B-8 POTHOLE EXISTING UTILITY On 10 EA $125 00 31,250 00 . Rev 3 EA $125 00 $375 00 ($875.00) 0 9 B 9 SHORING OR EXTRA EXCAVATION Ori 1 LS $1,000 00 $1,000 00 • CLASS B Rev 1 LS $1,000 00 $1,000 00 $0 00 0 10 B-10 COLD MIX Ori 70 TN $125 00 58,750.00 Rev 0 TN $125.00 $0 00 ($8,750.00) 0 11 B-11 CEMENT CONCRETE PAVEMENT Ori 102 CY $275 00 528,050 00 Rev 189 5 CY $275 00 $52,112 50 $24,062.50 0 �2 B 12 MANHOLE 34 IN DIAMETER- pri 7 Eq $2,900 00 $20,300 00 SHALLOW Rev 6 EA 52,900.00 $17,400.00 ($2,90000) 0 13 B-13 MANHOLE 48 IN DIAMETER,TYPE 2 Ori 7 EA $2,250 00 $15,750.00 � Rev 7 EA $2,250 00 $15,750 00 $0 00 0 14 B-74 SANITARY SEWER MANHOLE LINING Ori 2 EA $3,250 00 $6,500 00 • Rev 2 EA $3,250.00 $6,500 OD $0 00 0 15 8-15 UNSUITABLE PIPE FOUNDATION On 20 CY S50 00 $1,000 00 . EXCAVATION INCLUDING HAUL Rev 112 22 CY $50 00 $5,611 00 $4,611 00 0 16 B-16 CDF BACKFILL On 10 CY $170 00 $1,700 00 Rev. 0 CY $170 00 $0 00 ($1,700 00) 0 �� B�� PVC SANITARY SEWER PIPE 8 IN On 286 LF $63 00 $18,018 00 • DIAMETER Rev 280 2 LF $63 00 $17,652.60 ($365.40) 0 18 8-18 C900 PVC SANITARY SEWER PIPE 6 Ori 23 LF 3150 00 $3,450 00 . IN DIAMETER Rev 22 LF $150.00 $3,300 00 ($150 00) 0 19 B 19 C900 PVC SANITARY SEWER PIPE 8 Ori 223 LF $65.00 $14,495 00 IN DIAMETER Rev 241 5 LF $65 00 $15,697.50 $1,202 50 0 Ori 759 LF $112 00 $85,008 00 ... 20 B-20 PE SEWER PIPE 10 IN DIAMETER Rev 760 LF $112 00 $85,120 00 $112 00 0 21 8-21 PE LPS MAIN 4 IN DIAMETER Ori 66 LF $25 50 $1,683.00 ::.' ' Rev 76 LF $25 50 $1,938 00 $255 00 0 ZZ B ZZ 1 IN AIR AND VACUUM RELEASE On t EA $2,400 00 $2,400.00 ' VALVE ASSEMBLY Rev 1 EA 82,400 00 $2,400 00 $0 00 0 23 B-23 SLIP-LINING 4 IN DIAMETER On 674 LF $18.00 $12,132 00 Rev 700 LF $18 00 $12,600 00 $468 00 0 24 B-24 PVC SANITARY SEWER LATERAL On . 161 LF $19 00 $3,059 00 PIPE 4 IN DIAMETER Rev 335 LF $19 00 $6,365 00 $3,306 00 0 25 8-25 PVC SANITARY SEWER LATERAL Ori 48 LF $19 00 $912 00 .: . PIPE 6 IN DIAMETER Rev 105 2 LF S19 00 $1,998 80 $1,086 80 0 26 B-26 PE SANITARY SEWER LATERAL PIPE Ori 22 LF $55 00 $1,210 00 . 6 IN DIAMETER Rev 118 LF $55.00 $6,490 00 $5,280 00 0 27 B-27 PE LPS LATERAL 1-1l4 IN DIAMETER On 784 LF 57 DD $5,488 00 Rev 963 LF $7.00 $6,74100 $1,25300 0 Z8 B Z8 SINGLE LPS LATERAL SERVICE On 14 EA $2,600 00 $36,400.00 CONNECTION 1-1/4 IN DIAMETER Rev 15 EA $2,600 00 $39,000 00 $2,600 00 0 Z9 B Z9 LPS MAIN END-OF-RUN CLEANOUT 4 On 1 EA $3,300 00 $3,300 00 IN DIAMETER Rev 1 EA $3,300 00 $3,300.00 $0 00 0 30 8-30 PVC GRAVITY MAIN SEWER Ori 2 EA $750.00 $1,500 00 CLEANOUT 8 IN DIAMETER Rev 2 EA $750 00 $1,500 00 $0 00 0 31 B_31 SIMPLEX GRINDER PUMP On 11 EA $10,000 00 $110,000 00 ASSEMBLY,COMPLETE Rev. 12 EA $10,000 00 $120,000 00 $10,000 00 0 3Z B 3Z DUPLEX GRINDER PUMP ASSEMBLY, On 3 EA $15,000.00 $45,000 00:'� ' COMPLETE Rev. 3 EA $15,000.00 $45,000 00 $0.00 0 33 B-33 ELECTRICAL PANEL UPGRADE AND WCD 029 Ori 1 FA 570,000 00 $70,000 00 WIRING WCD 041 Rev 1 FA $40,096 90 $40,096 90 ($29,903.10) 0 � 34 B-34 EROSION/WATER POLLUTION Ori 1 LS $2,500 00 $2,500 00 CONTROL Rev 1 LS $2,500 00 $2,500.00 $0 00 0 35 B-35 CEMENT CONCRETE SIDEWALK On 240 SY $34 25 $8,220 00 Rev. 91 SY $34 25 $3,116 75 ($5,103 25) 0 LANDSCAPE REPAIR-GRINDER Ori 7 FA $50,000.00 $50,000.00 . ,.. 36 8-36 pUMPS �NCD 037 Rev t FA $46,440 52 $46,440 52 ($3,559 48) 0 $623,741 54 ($13,593 46) SCHEDULE B TAX(8.fi°/.) TOTAL ORIGINAL CONTRACT AMOUNT $637,335 00 $54,810 81 $692,145 81 9/24/2014 Page 6 Close Out Change Order �.::—_= ..e......,..e......«...e.........,.._.............�,. I � L_.—..._._ PUBLIC WORKS 8 Utilities Engineering Division � CLOSE OUT CHANGE ORDER-SCHEDULE C Pro�ect Name Washmgton Avenue Sewer Improvements Da�e 15-Sep-14 Contractor Pape and Sons Construction,Inc Contract No 5573 DESCRIPTION OF CHANGE You are hereb re uested to com I with the followin chan es from the contract Plans and s eafications Such work will be compensated by check one or more of the following as applicable[X J Increase or[X]Decrease in bid items,[]Force Account, X Ne otiated Price. The described work affects the existin contract items and/or adds and/or deletes bid items as follows Bid Item Descri tion C-1 Minor Changes and Force Account-was under the estimated quantity As such a credit of$27,953 60 is needed to close the contract C-4 Cement Concrete Pavement-total square yards(SY)was more than antiapated As such line item C-4 needs to increased by 58 SY or$580 00 C-5 Cement Concrete Sidwalk and Driveway Removal-total square yards was more than anticipated As such line item C-5 needs to increased by 76 square yards or $380 00. C-6 Cement Concrete Curb and Gutter Removal-total linear feet(LF)was more than antiapated As such line item C-6 needs to increased by 137 LF or$274 00 C-8 Pothole Existing Utility-was not needed for this Schedule C work As such a credit of$1,250.00 is needed to close the contract C-10 Cold Mix-total tonnage(TN)was less than the estimated quantity As such a credrt of 69 83 tons or$8,728 75 is needed to close the contract C-11 Cement Concrete Pavement-total cubic yards was more than anticipated As such line item C-11 needs to increased by 41 cubic yards or$11,275 00 ��z Unswtable Pipe Foundation Excavation Including Haul-total cubic yards was more than anticipated As such line item C-12 needs to increased hy 49 03 cubic yards or$2,451 50 C-13 CDF Backfill-was not needed for this Schedule C work. As such a credit of$1,700 00 is needed to close the contract C-14 DI Pipe(Restrained Joint)for Water Main 3-inch Diameter-was not needed for this Schedule C work As such a credit of$1,400 00 is needed to close the contract. C-15 DI Pipe(Restrained Joint)for Water Main 4-inch Diameter-was not needed for this Schedule C work As such a credit of 51,430 00 is needed to close the contract I ��6 DI Pipe(Restramed Joint)for Water Main 6-inch Diameter-total hnear feet(LF)was more than antiapated As such hne item C-16 needs to increased by 69 4 LF , or$5,239 70 ��� DI Pipe(Restrained Joint)for Water Main 8-inch Diameter-total linear feet(LF)was more than antiapafed As such line item C-17 needs to increased by 76 LF or $4,978 00 C-18 Gate Valve 4 inch-was less than the estimated quantity As such a credit of 1 each or$1,200.00 is needed to close the contract C-20 Gate Valve S inch-was less than the estimated quantity As such a credit ot 3 each or$4,800 00 is needed to close the contract ' C-21 Hydrant Assembly-was slightly more than the estimated quantity As such an increase of 1 each or$4,000 00 is needed to close the contract C-22 Smgle Service Connection 1 inch Diameter-was more than the estimated quantity As such an increase of 10 each or$11,000 00 is needed to close the contrect C-23 Single Service Connection 2 inch Diameter-was more than the estimated quantity As such an increase of 2 each or$4,000 00 is needed to close the contract C-26 Cement Concrete Sidewalk-total square yards(SY)was less than the estimated quantity As such a credit of 48 SY or$1,632.00 is needed to close the contract C-27 Cement Concrete Curb and Gutter Type A-total linear feet(LF)was more than antiapated As such line item C-27 needs to increased by 272 LF or$7,072 00 C-28 Cement Concrete Driveway Approach Type III-total square yards(SY)was more than antiapated As such line item C-28 needs to increased by 16 SY or $1,440 0� C-30 Cement Concrete Curb Ramp Type Combination-was less than the estimated quantity As such a credit of 1 each or$2,350 00 is needed to close the contrect C-31 Cement Concrete Curb Ramp Type Single Direction-was less than the estimated quantity As such a credit of 1 each or$1,900 00 is needed to Gose the contract. snanoin Page 7 Close Out Change Order Item No Description F07FNJCD k � pty Unrt S Cost Per Unit 5 Cost Net 8 Cast Atl�Days MINOR CHANGES ANO FORCE On 1 EST $40,000 00 $40,000 00 � �� ACCOUNT Rev 1 EST $12,046 40 $12,046 40 ($27,953 60) 0 2 C-2 MOBILIZATION Ori 1 LS $9,000 00 $9,000 00 Rev 1 LS $9,000 00 $9,000 00 $0 00 0 PROJECT TEMPORARY TRAFFIC Ori 1 LS $3,750 00 53,750.00_.__ 3 C3 CONTROL Rev 1 LS $3,750 00 $3,750 00 $0 00 0 4 C-4 CEMENT CONCRETE PAVEMENT Ori 1,387 SY $10 00 $13,870 00.: REMOVAL Rev. 1445 SY $10 00 $14,450 00 $580 00 0 5 C-5 CEMENT CONCRETE SIDEWALK AND Ori 221 SY $5 00 $1,105 00 . DRIVEWAY REMOVAL Rev 297 SY $5 00 $1,485 00 $380 00 0 6 C-6 CEMENT CONCRETE CURB AND Ori 194 LF $2 00 $388 00 GUTTER REMOVAL Rev 331 LF $2 00 $662.00 $274 00 0 7 C-7 REMOVE/ABANDON WATER SYSTEM Ori 1 LS $1,000.00 $1,000 00 '. . Rev 1 LS $1,000 00 $1,000 00 $0.00 0 8 C-8 POTHOLE EXISTING UTILITY On 10 EA 5125 00 $1,250 00 Rev 0 EA $125 00 g0 00 ($1,250 00) 0 SHORING OR EXTRA EXCAVATION Ori 1 LS $500 00 $500 00 " " :....' 9 C-9 CLASS B Rev 1 LS 5500 00 $500.00 $0 00 0 10 C-10 COLD MIX Ori 158 TN $125 00 $19,750 00 . Rev 88 17 TN $125.00 $11,021 25 ($8,728 75) p 11 C-11 CEMENT CONCRETE PAVEMENT Ori 231 CY $275 00 $63,525 00 Rev 272 CY $275 00 $74,800.00 $11,275 00 0 12 C-12 UNSUITABLE PIPE FOUNDATION Ori 20 CY $50.00 $1,000 00 EXCAVATION INCLUDING HAUL Rev 69 03 CY $50 00 $3,451 50 $2,451 50 0 13 C-13 CDF BACKFILL Ori 10 CY 5170 00 $1,700 00 � Rev 0 CY $170.00 $0 00 ($1,700 00) 0 14 C-14 DI PIPE(RESTRAINED JOINT)FOR Ori 14 LF $100.00 $1,400 00 WATER MAIN 3 IN DIAMETER Rev 0 LF $100 00 $0 00 ($1,400 00) 0 15 C-15 DI PIPE(RESTRAINED JOINT)FOR Ori 11 LF $130 00 $1,430 00 .. WATER MAIN 4 IN DIAMETER Rev. 0 LF $130 00 $0 00 ($1,430 00) 0 16 C-16 DI PIPE(RESTRAINED JOINT)FOR Ori 49 LF S75 50 $3,699.50 WATER MAIN 6 IN DIAMETER Rev 118 4 LF $75 50 $8,939 20 $5,239 70 0 �� �_�� DI PIPE(RESTRAINED JOINT)FOR Ori 2,765 LF $65 50 $181,107 50 • WATER MAIN 8 IN DIAMETER Rev 2,841 LF $65.50 $186,085 50 $4,978 00 0 18 C-18 GATE VALVE 4 IN Ori . 2 EA $1,200 00 $2,400 00 Rev 1 EA $1,200 00 $1,200 00 ($1,200.00) 0 19 C-19 GATE VALVE 6 IN ri . 1 EA 1,300 00 $1,300 00 . . ..;., Rev. 1 EA $1,300 00 $1,300 00 $0 00 0 20 C-20 GATE VALVE 8 IN Ori 22 EA $1,600 00 $35,200 00 Rev 19 EA $1,600 0� $30,400 00 ($4,800.00) 0 21 C-21 HYDRANT ASSEMBLY Ori 4 EA $4,000 00 $16,000 00 ,:>:. Rev 5 EA $4,000.00 $20,000 00 $4,000 00 0 ZZ �z2 SINGLE SERVICE CONNECTION 1 IN Ori 28 EA $1,100 00 $30,800 00 . DIAMETER Rev 38 EA $1,100 00 $41,800.00 $11,000 00 0 23 C-23 SINGLE SERVICE CONNECTION 2 IN Ori 1 EA $2,000 00 $2,000 00 DIAMETER Rev. 3 EA $2,000 00 $6,000 00 $4,000 00 0 24 C-24 2 IN BLOWOFF ASSEMBLY Ori 2 EA $2,350 00 $4,700.00 Rev 2 EA $2,350 00 $4,700.00 $0.00 0 25 C-25 EROSION/WATER POLLUTION On . 1 LS $2,500 00 $2,500 00 • CONTROL Rev. 1 LS $2,500 00 $2,500 00 $0 00 0 26 C-26 CEMENT CONCRETE SIDEWALK Ori 205 SY $34 00 $6,970 00 Rev 157 SY $34 00 $5,338 00 ($1,632 00) 0 z� �27 CEMENT CONCRETE CURB AND Ori 194 LF $26.00 $5,044 00 :: GUTTER TYPE A Rev 466 LF $26 00 $12,116 00 $7,072 00 0 28 C-28 CEMENT CONCRETE DRIVEWAY On 16 SY $90.00 $1,440 00 APPROACH TYPE III Rev 32 SY 390 00 $2,880.00 $1,440 00 0 z9 �29 CEMENT CONCRETE CURB RAMP Ori . 7 EA $1,800 00 $12,600 00 TYPE PARALLEL Rev 7 EA $1,800 00 $12,600 00 $0 00 0 30 C-30 CEMENT CONCRETE CURB RAMP On 2 EA $2,350 00 $4,700 00 � • TYPE COMBINATION Rev 1 EA $2,350 00 $2,350 00 ($2,350 00) 0 31 C-31 CEMENT CONCRETE CURB RAMP Ori 1 EA $1,900 00 $1,900.00 TYPE SINGLE DIRECTION Rev 0 EA $1,900 00 $0 00 ($1,900.00) 0 $470,374 85 ($1,654.15) SCHEDULE C TAX(8.6•/.) TOTAL ORIGINAL CONTRACT AMOUNT ' $472,029 00 $40,594 49 $512,623 49 924R014 Page 8 Contract Number: 5369 Vendor: PARAMETRIX INC Subject: PSA - Engineering Design Services - Pavement Preservation Project Department: Engineering File Class: LEG 12-1 Begin Date: 4/14/2014 End Date: 6/30/2014 Review Date: 7/15/2014 Vault Date: 2014. Comments: Amendment No. 1 9/16/14 &0�011_ ��5e'_V 6H AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Supplemental Agreement No. 1 Study Session Date: July 23, 2014 to amend Contract with Parametrix, Inc. for COUNCIL MEETING Date: August 6, 2014 Construction Management on the Pavement Department: PW&U Preservation Projects Presenter: Chal Martin Phone: 360.473.5758 SUMMARY: With the two Pavement Preservation Projects moving towards bidding and construction, assistance is required from Parametrix for these activities. This amendment will provided assistance to the City during the bidding period and provide a project engineer for both projects. Inspection will be handled in-house. The original contract for design of the projects was $24, 689. This amendment is for$18,451, or a total contract amount of$43,140. ATTACHMENTS: 1) Supplemental Agreement No. 1 with Exhibits A,B and C; and 2) Original Agreement with Exhibits A, B and C FISCAL IMPACTS (Include Budgeted Amount): Project is funded through the TBD. STUDY SESSION AGENDA: ❑x No Presentation ❑ Full Presentation STUDY SESSION ACTION: ❑x Consent Agenda ❑ General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve Supplemental Agreement No. 1 for Parametrix, Inc., and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: (Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action Form Updated 01/25/13 --... -------------- ---- - -- .. is ( L, Executive Correspondence Routing Memo Date: September 12, 2014 Description: Pavement Preservation Project, Amendment No. 1 Action Requested: Approval/Signature Originator: Gunnar Fridriksson Coordination/Approval / Recommendation: Public Works Manager: Recommended Initials/date Public Works Director: Recommended Initials/date I Finance Director(if applicable): Recommended Initials/date City Attorney(if applicable): Reco mended Initials/date 5 Mayor: Approval Signature PLEASE RETURN EXECUTED COPY TO LINDA FULTON Please return to Public Works Administration for final processing upon approval/signature. Public Works& Utilities 1100 Oyster Bay Ave.N.,Bremerton.WA 98312*Phone(360)473-5315 *Fax(360)473-5018 SUPPLEMENTAL AGREEMENT NO. 1 Time Extension and Revision to Scope of Work Project No. 4294/4297 Agency City of Bremerton Name of Project Pavement Preservation Project Agreement No.: 1 The City of Bremerton desires to supplement the agreement entered into with Parametrix and executed on April 14,2014. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1,SCOPE, is hereby revised as shown and outlined on Exhibit A. Section 2,TERM, is hereby extended to December 31,2014. All invoices to the City shall be received by January 7,2015. Section 3, COMPENSATION, is hereby revised: The original contract for design of the projects was$24,689. This Supplemental Agreement No. 1 adds$18,451 to the original contract amount for a new total contract amount of$43,140. Except as herein modified,the terms of the AGREEMENT shall remain in full force and effect. In WITNESS WHEREOF,the parties hereto have executed this SUPPLEMENTAL AGREEMENT NO. 1 to the Professional Services Agreement of the date and year indicated. For Parametrix dated this l �h day of "/g&42014. By: For the City of Bremerton,dated this of 3601—AN8 iI ,-2014. B Y• DEPARTM7 APPROVAL: Chal Martin, Director of Pul5lic Works an&gtilities APPROVED AS TO FORM: 5C4iA�t�torney EIVED FOR FILING: annon Corin-City Clerk EXHIBIT A SCOPE OF WORK City of Bremerton 09 Pavement Preservation Project Amendment 01 —Add Construction EngineeringlManagement Task INTRODUCTION This scope of work(SOW)is to amend Parametrix's existing contract by adding a Construction Engineering and Management task(Task 04). This amendment requires addition of$18,451to the existing project budget of$25,189. Refer to the attached budget spreadsheet(Exhibit C)for a detailed budget breakdown. The following work will be performed under this SOW: Task 04—Construction Engineering and Management Objectives: Provide construction engineering and management support during the construction phase of both the Overlay and Chip Seal projects. It is anticipated that both projects will occur during the same 45-working day period. Activities: The following activities will be performed as part of this task: • Coordinate and lead pre-construction and weekly progress meetings. • Review Contractor's submittals for compliance with the plans and specifications. • Respond to applicable Contractor's Requests for Information(RFIs)and requests for change orders and make recommendation to the City. • Provide period observation during construction. • Complete periodic observation reports(if needed)including photos and prepare a weekly email construction summary report for the City. • Review and recommend payment requests,all logs for submittals,RFI's,Field Orders,and assist in preparation of Change Orders. • Coordinate necessary testing and inspections. • Provide routine project management and communications. Deliverables: The following deliverables are associated with this task: • Routine correspondence,budget updates,status reports on progress of work,and invoices. Pavement Preservation Project July 16,2014 Amendment No.01 Scope of Work • Hard copies and electronic copies of responses to material submittals, cut sheets, shop drawing review,RFIs,and requests for change orders. • Weekly email construction report. Assumptions: The following assumptions are associated with this task: • Project management tasks will be performed through the active construction period,which is assumed to extend over 45 working days(7 weeks). • Day to day construction inspection and daily inspection report preparation will be performed by City staff. In addition City staff will work with the Contractor in the field to "field fit"curb ramps to meet ADA requirements to the mum extent feasible. Pavement Preservation Project July 16,2014 Amendment 01 Scope of Work EXHIBIT B SCHEDULE Construction Notice to Proceed August 18, 2014 Physical Completion (45 Working Days) October 17, 1014 Contract Closeout December 31, 2014 Pavement Preservation Project July 16,2014 Amendment 01 Scope of Work PARAMETRIX EXHIBIT C - BUDGET Project: Pavement Preservation Project CLIENT: City of Bremerton PMX# STAFF Const Mgr. CMI Eng. P.Coad. 233-1896-123 S.Thanpson D.Dinkuhn S.Ihlen TOTAL Total Cost PHASE TASK DIRECT RATES $47.17 $53.48 $35.00 HOURS (3.1 Mut) 1 4 Construction Engineering and Management _ Submittal Review 4 4 $663 Meetings and Observation(7 weeks at 12 hrs per week assumed) 841 4 88 $12,946 Documentation(7 weeks at 5 hrs per week assumed) 35 35 $3,798 Subtotal 84 8 35 127 $17,407 Expenses 6%of Labor I $1,044 $18,451 Prepared y: , . Project Manager 7/16/2014 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: �'icZ. � PARAMETRIX INC PSA - Engineering Design Services - Pavement Preservation Project Engineering LEG 12-1 4/14/2014 6/30/2014 7/15/2014 2014 Comments : PROFESSIONAL SERVICES AGREEMENT Engineering Design Services - Pavement Preservation Project The City of Bremerton ("City") and Parametrix ("Consultant"), referred to collectively as the "Parties," enter into the following Agreement for professional services: I. Scope: The Consultant agrees to perform the services more specifically described in the Scope of Work, dated March 11, 2014, including any attachments thereto , attached hereto as Exhibit A, which is incorporated by reference herein. The Scope of Work may be modified only pursuant to Section VII.G of this Agreement. If the Scope of Work provides for unspecified additional services such services shall only be performed upon the express written request of the City. Consultant further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices in effect at the time such services are performed. II. Term: The City and the Consultant agree that work will begin on.,the tasks described in Exhibit A- immediately upon execution of this Agreement. The parties agree that the work described in Exhibit A is to be completed as provided for in the work schedule attached hereto �as � Exhibit B; provided however, that additional time shall be granted by the City for excusable delays or extra work as provided for in Section IX.A of this agreement. III. Compensation: In consideration of the services provided pursuant to this Agreement, the City shall pay Consultant in an amount not to exceed $24,689. Consultant's charges and bills shall conform to the fee schedule attached hereto as Exhibit C and incorporated herein by this reference. The Consultant shall submit regular billing statements detailing work performed and amount charged on each task or portion thereof. The descriptions shall conform to and fall within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a conforming billing statement, the City shall promptly process payment. PROVIDED, HOWEVER, the City reserves the right to prioritize scoped work and accelerate and/or delay work tasks under the time frame set forth in Section II herein. The Consultant's labor rates and billing fees shall be as delineated in Exhibit C. Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modi�ed pursuant to this Agreement. Consultant shall only be compensated for additional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be in accordance with Exhibit C. If a billing statement does not conform to this Agreement, the City may withhold payment until the statement is brought into compliance. Such withholding does not relieve Consultant of its obligations under this Agreement. IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed in the Scope of Work and is performing independent functions and responsibilities within its field of Bremerton/Parametrix Pavement Preservation Project Page 1 of 7 expertise. Consultant and its personnel are independent Consultants and not employees of the City. Consultant and its personnel have no authority to bind the City or to control the City's employees and other Consultants. None of the benefits provided by the City to its employees, including, but not limited to, compensation, insurance, and unemployment insurance are available from the City to the employees, agents, representatives, or sub-Consultants of the Consultant. Consultant will be solely and entirely responsible for its acts and for the acts of Consultant's agents, employees, representatives and sub-Consultants during the performance of this Agreement. The City may, during the term of this Agreement, engage other independent Consultants to perform the same or similar work. As an independent Consultant, Consultant is responsible for its own management. The City's administration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Consultant or its personnel. As an independent Consultant, Consultant is responsible for payment of all taxes and licensing fees necessary to perform its obligations under this Agreement. These taxes and fees include but are not limited to State industrial insurance, Business & Occupation, State professional licensing, and City business licensing. If any taxes or fees due the City have been declared delinquent, the City may withhold the delinquent amount, plus any additional charges arising from the delinquency, from any payments due Consultant. V. Indemnification: A. , Consultant shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with Consultant's performance of this Agreement, unless Consultant is conducting work pursuant to Subsection B below. The City's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of indemnification. B. Architects, Engineers and Anv Other Professional Listed In and Performin� Services Defined in RCW 42.24.1 l5: Should a court of competent jurisdiction determine that Consultant's services provided pursuant to this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concunent negligence of the Consultant and the City, its officers, of�cials, employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TTTLE S l RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. Bremerton/Parametrix Pavement Preservation Project Page 2 of 7 The provisions of this section shall survive the expiration or termination of this Agreement. VI. Insurance: The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees, sub-consultants or sub-Consultants. Before beginning work on the project described in this Agreement, the Consultant shall provide a Certificate of Insurance evidencing: p. Automobile Liabilitv insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commercial General Liabilitv insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCU) if applicable; and employer's liability; and 3. Excess Liabilitv insurance with limits not less than 1,000,000 limit per occurrence and aggregate. 4. Professional Liabilitv insurance with limits no less than $1,000,000 limit per occurrence/claim. Any payment of deductible or self insured retention shall be the sole responsibility of the Consultant. All required policies shall be provided on an "occurrence" basis except professional liability insurance (if required), which may be provided on a"claims-made" basis. The City shall be named as an additional insured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the City, which names the City as an additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all the required insurance policies and endorsements. The City further reserves the right to reject any unacceptable policies and/or endorsements. The Consultant's Commercial General Liability insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Consultant's insurance shall be primary insurance as respects the City and it shall be an affirmative obligation upon Consultant to advise the City's Risk Manager by fax at (360) 473- 5161, or by certified mail, return receipt requested to City of Bremerton, attn: Risk Management, 345 6 th Street, Suite 600, Bremerton, WA 98337 within two days of the cancellation, suspension Bremerton/Parametrix Pavement Preservation Project Page 3 of 7 or substantive change of any insurance policy set out herein, and failure to do so shall be construed to be a breach of this Agreement. The City also reserves its unqualified right to require at any time and for any reason, proof of coverage in the form of a duplicate of the insurance policy with all endorsements as evidence of coverage. VII. General Conditions: A. Ret�orts and Information: When requested by the City, Consultant shall furnish periodic reports and documents on matters covered by this Agreement. The reports and documents shall be furnished in the time and form requested. Consultant shall maintain accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to substantiate all billed amounts. B. Ownership and Use of Records and Documents: Original documents, drawings, designs and reports, including those in electronic format, developed under this Agreement are the property of the City. All written information submitted by the City to the Consultant in connection with the services performed by the Consultant under this Agreement will be safeguarded by the Consultant to at least the same extent as the Consultant safeguards like information relating to its own business. If such information is publicly available or is already in Consultant's possession or known to it, or is rightfully obtained by the Consultant from third parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise. •All data, documents and files created by Consultant under this Agreement may be stored at Consultant's office in Bremerton, Washington. Consultant shall make such data, documents, and files available to the City upon its request at all reasonable times for the purpose of editing, modifying and updating as necessary until such time as the City is capable of storing such information in the City's offices. Duplicate copies of this information shall be provided to the City upon its request, and at reasonable cost. � All documents, including all reports, drawings, specifications, computer software or other items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service with respect to the project and are the property of the City. Any reuse by the City for other than the specific purpose intended will be at City's sole risk. C. Work Performed at Consultant's Risk: Consultant shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and sub-consultants in the performance of the work hereunder and shall utilize all protection necessary for that purpose. All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. D. Place of Work: The Consultant shall perform the work authorized under this Agreement at its offices in Bremerton, Washington. Meetings with the City staff as described in Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties. Bremerton/Parametrix Pavement Preservation Project Page 4 of 7 E. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. F. Severabilitv: Should any part of this Agreement be found void, the balance of the Agreement shall remain in full force and effect. G. Modification: This Agreement may only be modified by written instrument signed by both Parties. H. Written Notices: All communications regarding this Agreement shall be sent to the parties at the addresses listed below by registered or l st class mail, or by personal service, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. City Address Engineering & Water Resources 3027 Olympus Drive Bremerton, WA 98312 Consultant Address Parametrix � 4660 Kitsap Way, Suite A Bremerton, WA 98312 I. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be deemed waiver of any other right or power. J. Non-Waiver of Breach: The failure of the City to insist upon strict performance of any of the covenants and agreements contained herein, or to exercise any option herein conferred in one or more instances shall not be construed to be a waiver or relinquishment of said covenants, agreements or options, and the same shall be and remain in full force and effect. K. Compliance with Laws: Consultant shall comply with all applicable Federal, State, and local laws in performing its obligations under this Agreement. L. Choice of Law and Venue: This Agreement shall be interpreted according to the laws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in Kitsap County Superior Court. M. Attorneys' Fees: In the event of litigation to enforce any of the terms or provisions herein, each party shall pay all its own costs and attorney's fees. N. Assi nment: Any assignment of this agreement by the Contractor without the written consent of the City shall be void. VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the public on the basis of race, color, national origin, sex, religion, age, marital status, disability, or sexual orientation except for employment actions based on bona fide occupational qualification. Bremerton/Parametrix Pavement Preservation Project Page 5 of 7 IX. Termination: This Agreement shall remain in force until completion and acceptance of the services, terminated by written instrument upon mutual consent, or by the City of Bremerton for convenience. This Agreement may be immediately terminated for cause by a Party if the other Party substantially fails to perform through no fault of the terminating Party, and the non- performing Party does not commence correction of the failure of performance within thirty (30) days of the terminating Pazty's sending notice to the non-performing Party. Any Notice by Consultant shall include a report showing the status of all items listed in the Scope of Work cunent through the termination date. If the City receives reimbursement by any federal, state, or other source for work described in Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is cancelled or substantially reduced after the execution date of this Agreement and prior to the completion of the work, the City may summarily terminate this Agreement. A. Excusable Delays: The right of Consultant to proceed shall not be terminated nor shall Consultant be charged with liquidated damages for any delays in the completion of the work due to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials, equipment, tools, or labor by reason of war, national defense, or other national emergency; 2) any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God, �res, floods, strikes, or weather of unusual severity. PROVIDED, HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement, the delay is properly excusable, the City shall, in writing, extend the time for completing the work for a period of time commensurate with the period of excusable delay. B. Ri ng ts U�on Termination: In the event of termination, the City shall pay for all services performed by the Consultant to the effective date of terminafion, as described on a final invoice submitted to the City. After termination, the City may take possession of all records and data within the Consultant's possession pertaining to this project which may be used by the City without restriction. Any such use not related to the project which Consultant was contracted to perform shall be without liability or legal exposure to the Consultant. X. Suspension & Debarment. For contracts involving Federal funding, Consultant hereby certifies, by signing this agreement, that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency. Consultant shall provide immediate written notice to the City if at any time it learns that it is or has become ineligible for certification. Should Consultant enter into a covered transaction with another firm, Consultant agrees by signing this agreement that it will verify that the firm with whom it intends to do business is not debarred, suspended, ineligible, excluded or disqualified. B rem erton/Parametri x Pavement Preservation Project Page 6 of 7 CONSULTANT �' (� � vL Bv: �S % r 1tS: � � • �Io-fl�! ��/K � Date: ,� �/ 3� At . City Clerk 4 Client Agreements\CityofE3remerton�Pavement\PSAFinaI docx Bremerton/Parametrix Pavement Preservation Project Page 7 of 7 EXHIBIT A- SCOPE OF WORK City of Bremerton Pavement Preservation Project INTRODUCTION This Scope of Work (SOW) presents Parametrix's proposed tasks to provide a plans, specifications and estimate (PS&E) bid package for the Pavement Preservation Project. The purpose of the project is to preserve selected City roadways using seal coat (emulsion and aggregate) or grind and overlay. Our tasks include selection of candidate roadways and prioritization of the roadways in coordination with City staff. The total amount of roadway planned for preservation will be targeted to meet an estimated maximum construction budget of $75,000 for seal coat and $300,000 for grind and overlay. Once a set of roadways is selected, a PS&E package wil] be prepared for bidding. The following tasks are associated with this SOW: Task 1 Project Management and Meetings Objective Obtain project data; monitor and manage scope, schedule, and budget; and periodically meet with the City and other members of the design team to review project status. Activities The following activities are associated with this task: � Schedule, prepare for, attend, and document up to two project meetings that will include the Consultant and City staff. • Manage and direct the project technical team. • Provide routine project management and communications (scope, schedule, budget, invoicing, etc.). • Prepare detailed monthly progress reports and progress billings and submit to the City for approval and payment. The monthly report will include: z A narrative of the work performed and the tasks to be performed in the next reporting period and, if necessary, explanation of delays, problems, responsive action requirements by the Consultant and the City, and other project needs. Deliverables The following deliverables will be prepared: • Routine correspondence including monthly progress reports. • Meeting agendas and notes. Ciry oj/Jrernenon 234-1896-870 Puvemenr Preservution Yr�gect l Murch 11, 20/4 Sc•npe nf Work Assumptioits The following assumptions apply to this task: • Design deliverables review meetings will be attended by appropriate Parametrix staff. • Project duration will be 4 months (March through June 2014). Task 2 60%, 100% and Bid Set Plans, Specifications and Estimate (PS&E) Objective Prepare 60%, 100%, and Bid Set plans, specifications, and cost estimates for the preservation improvements. Activities The following activities will be performed as part of this task: • Walk the candidate roadways selected by the City to identify pavement repair areas, planing areas, ADA ramp types and locations, and miscellaneous needed work. • Prepare engineering plans for the roadway preservation in plan/plan view that show pavement repair areas, pavement planing areas, seal coat or overlay (as applicable) areas, channelization, and ADA ramp locations. Plan sheets will contain plans at a scale of 1 inch = 50 feet. • Prepare a cost estimate at each deliverable stage. o Prepare special provisions at each deliverable stage. • Prepare contract documents for the 100%, and Bid Set deliverables packages • Provide support during bidding. Deliverables The following deliverables are associated with this task: � The proposed plan sheets to be delivered for this task are listed in the budget spreadsheet in Exhibit C. A summary of the total number of sheets is provided as follows: ➢ Roadway: l3 sheets • 60°Io, ] 00°Ic, and Bid Set cost estimates. • 100%, and Bid Set contract documents. • One hard copy and one PDF set of all plans (on 11"x17"), special provisions, and cost estimates at each design stage. • AutoCAD and PDF files of all drawings and documents provided on CD-ROM. • Two hard copies of Bid Set Plans on full-sized sheets (sealed by Washington P.E.), special provisions, and contract documents. CitV of Ilrenmrtan 234-/89h-870 Puvemenr Preservutinn Pro,/ecr 2 Mnrch 11, 2014 Scope � f Work • Assumptions The following assumptions are associated with this task: • Separate bid schedules will be prepared for each roadway so that work may be deleted if bids exceed the available construction funds. • The base maps for the plan sheets will consist of aerial photographs provided by the City. � Special provisions and all drawings will follow WSDOT format. • The City will provide the legal documents section of the contract documents in Word format. • No fundamental design changes will be made at 100%. Task 3 — Directed Services Objective Provide additional technical services as requested and authorized in writing by the City. Activities The following activities may be associated with this task: � As requested by the City. Deliverables The following deliverables will be prepared: • As requested by the City. Assumptions The following assumptions apply to this task: • Work under this task will require prior written authorization from the City. Ciry oJBrernenan 234-1896-870 Puventen! Preservuliun Prnjec:� 3 Murch 11, 2014 Scope of Work EXHIBIT B - SCHEDULE Work Element Completed By Notice to Proceed 60% PS&E (3 weeks) 100% PS&E(2 weeks) Bid Set PS&E Construction March 14, 2014 April 04, 2014 April 18, 2014 April 25, 2014 May 2014 Project Closeout June 30, 2014 NOTE: The assumed turnaround time for City review of deliverables is 3 days. Ci{t� of 13ren:rrlun 234-1896-R70 Puvemenr Pre:sen�utinn Pro,/ec( 4 Murch 11. 2014 Scnpe of Wnrk PARAMETRIX EXHIBIT C - �UDGET 3/13/2014 ProjeCt: Pavement Preservation Project Client: City of Bremerton � PMX # BILLING STAFF PM Sr Eng � CADD WP Acct 234-1896-870 MULT • D Dinkuhn T Smdh K Braaten L. Edwards L Stevens TOTAL BASE TOTAL PHASE TASK 3 10 Direct Labor Rate $53.48 $55 29 $25 36 $28 00 $26 75 HOURS COST COST 1 1 Project Management and Meetings Meetings with City (2) 4 4 � 8 $435.08 $1,349 Project Management (4 mo.) 4 , 4 8 $320 92 $995 Subtotal 8 I 4 4 16 $756.00 $2,344 1 2 60%,100% and Bid Set PSBE Field Survey and Locate ADA Ramps 8 12 20 $1,09132 $3,383 SHEETS Cover Sheet with Vicinity and Loc Map 1 1 $25.38 $79 Legend, Abbr. and Index 1 1 $25 38 $79 Overlay Sheets - 50 Scale PIanlPlan (4) 8 16 24 $833.92 $2,585 Seal Coat Sheets - 50 Scale PIanlPlan (6) 12 24 36 $1,250.88 $3,878 Details 4 4 � 8 $315.44 $978 QA/QC 4 4 $221.16 $686 60%Specials 8 4 12 $539.&4 $1,674 60% Estimate 2 2 $106 96 $332 100% PS&E 4 � � 4 8 $325 92 $1,010 Bid Set PS&E 4 � 4 i 8 $325.92 $1,010 Support During Bidding 4 4 8 $325 92 $1,010 Subtotal 54 16 46 16 132 $4,296.72 $16,703 Labor Subtotal 62 20 46 16 4 148 $5,053 $19,047 1 3 Directed Services � i ! _ Directed Seroices ___1 i _ " $4,500 Expenses i 6%of Labor $1,143 PROJECT TOTAL TOTAL $24,689 Prepared By. D. Dinkuhn Reviewed By: P. Struck Project Manager Senior Consultant Budget 031114.x1sx Page 1