HomeMy WebLinkAbout5354r �
Contract Number:
Vendor:
Sub�ect:
Department:
File Class:
Begin Date:
End Date:
Review Date:
Vault Date:
Comments :
5354
PARAMETRIX INC
PSA - Marine Drive Stormwater LID Retrofit
Water Resources
LEG 12-1
2/19/2014
11/30/2014
9/1/2014
�
PROFESSIONAL SERVICES AGREEMENT
Engineering Design Services — Marine Drive Stormwater LID Retrofit
Parametrix � � � {� � n1 � �
U {V
� ,
The City of Bremerton ("Crty") and Pazametnx ("Consultant"), refened to collectively as
the "Parties," enter into the following Agreement for professional services
I. Scope: The Consultant agrees to perform the sernces more specifically descnbed in the
Scope of Work, dated February, 2014, includmg any attachments thereto, attached hereto as
Exlubrt A, which is mcorporated by reference herem The Scope of Work may be modified only
pursuant to Section VII G of this Agreement If the Scope of Work provides for unspecified
addrtional sernces such sernces shall only be performed upon the express wntten request of the
City Consultant further represents that the sernces funushed under this Agreement will be
performed m accordance with generally accepted professional practices in effect at the tune such
sernces are performed
II. Term: The City and the Consultant agree that work will begm on the tasks described m
Exhibit A immediately upon execuhon of tlus Agreement. The parties agree that the work
descnbed m Exlubit A is to be completed as provided for m the work schedule attached hereto as
Exlubrt B, provided however, that additional time shall be granted by the City for excusable delays
or extra work as provided for in Sechon IX A of this agreement `
III. Compensation: In considerahon of the sernces provided pursuant to tivs Agreement, the
City shall pay Consultant m an amount not to exceed $120,000 Consultant's charges and bills
shall conform to the fee schedule attached hereto as Exhibit C and mcorporated herem by tlus
reference.
The Consultant shall submit regular billing statements detailing work performed and
amount charged on each task or portion thereof The descriptions sha11 conform to and fall witlun
the categones set out m the Scope of Work and/or Fee Schedule Upon receipt of a confornung
billmg statement, the City shall promptly process payment PROVIDED, HOWEVER, the City
reserves the nght to pnonhze scoped work and accelerate and/or delay work tasks under the time
frame set forth in Section II herem The Consultant's labor rates and billing fees shall be as
delmeated m Exlubrt C
Consultant shall not perform work beyond the Scope of Work, nor shall be compensated
for such work, unless the Scope of Work or amount of compensation is modified pursuant to tlus
Agreement Consultant shall only be compensated for addrtional services if requested pursuant to
Section I and, if not otherwise provided, such compensation shall be m accordance with Exlubit
C
If a billing statement does not conform to tlus Agreement, the City may withhold payment
until the statement is brought into compliance Such withholdmg does not relieve Consultant of
its obligations under this Agreement.
Bremerton/Parametnx '
Manne Dnve LID Stormwater Retrofit
Page 1 of 13
IV. Relationslup of P�rties: Consultant represents that it is skilled m the matters addressed m
the Scope of Work and is perfornung independent functions and responsibihties v�ntlun rts field of
e ertise. Consultant and rts personnel are mdependent Consultants and not employees of the
�� �� � tant and its personnel have no authonty to bmd the City or to control the City's
d other Consultants None of the benefits provided b� the City to its employees,
includir►g, but not hmrted to, compensation, insurance, and unemployment msurance are available
from the City to the employees, agents, representahves, or sub-Consultants of the Consultant
Consultant will be solely and enhrely responsible for rts acts and for the acts of Consultant's agents,
employees, representahves and sub-Consultants dunng the performance of tlus Agreement. The
Crty may, during the term of tlus Agreement, engage other mdependent Consultants to perform
the same or similar work
As an mdependent Consultant, Consultant is responsible for its own management The
City's administrahon and enforcement of this Agreement shall not be deemed an exercise of
managenal control over Consultant or rts personnel
As an mdependent Consultant, Consultant is responsible for payment of all taxes and
hcensmg fees necessary to perform its obhgations under ttus Agreement. These taxes and fees
mclude but are not limrted to State industnal msurance, Busmess & Occupation, State professional
hcensmg, and Crty busmess hcensing If any t�es or fees due the City have been declared
delmquent, the City may v�nthhold the delmquent amount, plus any additional charges arising from
the dehnquency, from any payments due Consultant
V. Indemnification:
A Consultant shall defend, mdemmfy and hold the Crty, its officers, officials,
employees, agents and volunteers harmless from any and all clauns, m�unes, damages, losses or
suits, including all legal costs and attorney fees, ansing out of or in connection with Consultant's
performance of tlus Agreement, unless Consultant is conduchng work pursuant to Subsection B
below
The Crty's review or acceptance of any of the work when completed shall not be grounds
to avoid any of these covenants of mdemrufication
B Arclutects Eng�neers and Any Other Professional Listed In and Perfornung
Services Defined in RCW 42 24.115 Should a court of competent �unsdichon determine that
Consultant's services provided pursuant to tlus Agreement is sub�ect to RCW 4 24 115, then, m
the event of habilrty for damages ansmg out of bodily m�ury to persons or damages to property
caused by or resulhng from the concurrent negligence of the Consultant and the Crty, its officers,
oi�icials, employees, agents and volunteers, the Consultant's liabilrty hereunder shall be only to
the extent of the Consultant's negligence
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE -
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WANER
OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE
Bremerton/Parametnx
Manne Dnve LID Stormwater Retrofit
Page 2 of 13
PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE
THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER
The provisions of tlus sechon shall survive the expiration or termination of tlus Agreement
VI. Insurance: The Consultant shall procure and mamtam for the duration of the Agreement,
insurance agamst claims for in�uries to persons or damage to property which may anse from or m
connechon with the performance of the work hereunder by the Consultant, its agents,
representahves, employees, sub-consultants or sub-Consultants
Before begimm�g work on the pro�ect described m this Agreement, the Consultant shall
provide a Certificate of Inswance evidencing:
1. Automobile Liabilitv uisurance with limits no less than $1,000,000 combined smgle limit
per accident for bodily m�ury and property damage, and
2. Commercial General Liabilitv insurance wntten on an occurrence basis with lixnrts no
less than $1,000,000 combined single limrt per occurrence and general aggregate for
personal m�ury, bodily m�ury and property damage Coverage shall include but not be
limrted to blanket contractual, products/completed operations/broad form property
damage; explosion, collapse and underground (XCU) if applicable, and employer's
hability, and -
3. Excess Liabilitv msurance with limits not less than 1,000,000 limit per occurrence and
aggregate
4. Professional Liabilitv msurance with limits no less than $1,000,000 limit per
occurrence/claim
Any payment of deduchble or self-msured retention shall be the sole responsibility of the
Consultant
All required policies shall be provided on an"occurrence" basis except professional
liabihty msurance (if required), wluch may be provided on a"claims-made" basis
The City shall be named as an addrtional msured on the Commercial General Liabihty
msurance policy, as respects work performed by or on behalf of the Consultant and a copy of an
endorsement that is acceptable to the Crty, wluch names the Crty as an addrtional insured shall be
attached to the Certificate of Insurance The City reserves the nght to receive a certified copy of
all the required insurance policies and endorsements The City further reserves the nght to re�ect
any unacceptable policies and/or endorsements
The Consultant's Commercial General Liability msurance shall contam a clause stating that
coverage shall apply separately to each msured agamst whom claim is made or suit is brought,
except with respects to the limits of the insurer's liability
The Consultant's msurance shall be pnmary msurance as respects the City and it shall be
an�rmative obligation upon Consultant to advise the City's Risk Manager by fax at (360) 473-
5161, or by certified mail, return receipt requested to City of Bremerton, Attn Risk Management,
Bremerton/Parametnx
Manne Dnve LID Stormwater Retrofit
Page3of13
345 6�' Street, Surte 600, Bremerton, WA 98337 wrtlun two days of the cancellahon, suspension
or substantive change of any insurance policy set out herem, and faslwe to do so shall be construed
to be a breach of tlus Agreement
The City also reserves its unquahfied nght to require at any tune and for any reason, proof
of�coverage m,the form of a duphcate of the msurance pohcy with a11 endorsements as evidence
of coverage. � -
VII. General Conditions:
A Reports and Informahon When requested by the City, Consultant shall funush
periodic reports and documents on matters covered by this A�greement The reports and documents
shall be furrushed m the time and form requested Consultant shall mamtain accounhng records
m accordance wrth Generally Accepted Accountmg Pruiciples (GAAP) to substantiate all billed
amounts
B Ownerslup and Use of Records and Documents Onginal documents, drawuigs,
designs and reports, mcludmg those m electromc format, developed under tlus Agreement are the
property of the City All wntten mformation submitted by the City to the Consultant m connection
wrth the services performed by the Consultant under tlus Agreement will be safeguarded by the
Consultant to at least the same extent as the Consultant,safeguards like informahon relatmg to its
own busmess If such information is publicly available or is already m Consultant's possession or
known to it, or is nghtfully obtamed by the Consultant from third parties, Consultant shall bear no
responsibilrty for rts disclosure, madvertent or otherwise
All data, documents and files created by Consultant under this Agreement may be stored
at Consultant's office in Bremerton, Waslungton Consultant shall make such data, documents,
and files available to the Crty upon rts request at all reasonable times for the purpose of edihng,
modifying and updatmg as necessary until such time as the City is capable of storuig such
mformation m the City's offices Duplicate copies of this mformation shall be provided to the City
upon its request, and at reasonable cost
All documents, including all reports, drav�nngs, specificahons, computer soflware or other
items prepared or funushed by Consultant pursuant to tlus Agreement, are mstruments of service
with respect to the pro�ect' and are the property of the City Any reuse by the City for other than
the specific purpose mtended will be at Crty's sole nsk
C Work Performed at Consultant's Risk Consultant shall take all precauhons
necessary and sha11 be responsible for the safety of rts employees, agents, and sub-consultants m
the performance of the work hereunder and shall urihze a11 protection necessary for that purpose
All work shall be done at Consultant's own nsk, and Consultant shall be responsible for any loss
of or damage to materials, tools, or other articles used o'r held for use m connechon with the work.
D Place of Work The Consultant shall perform the work authonzed under this
Agreement at its offices iri Bremerton, Waslungton. Meehngs wrth the City staff as described m
Bremerton/Parametnx
Manne Dnve LID Stormwater Retrofit
Page 4 of 13
Exlubit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed
upon by the parties ,
E Ent�re A�reement• Tlus Agreement and rts Exhibrts constitutes the ent�re agreement
between the Parhes, and the Parties acknowledge that there are no other agreements, wntten or
oral, that have not been set forth m the text of tlus Agreement
F Severabilitv Should any part of tlus Agreement be found void, the balance of the
Agreement shall remaui in full force and effect
G Modification Tlus Agreement may only be modified by wntten instrument signed
by both Parties
H Wntten Notices All commurucahons regardmg tlus Agreement shall be sent
to the parties at the addresses listed below by registered or 1 st class mail, or by personal service,
and shall be deemed sui�iciently given if sent to the addressee at the address stated m tlus
Agreement or such other address as may be hereafter specified in wntmg.
Crty Address
Public Works and Utilities
100 Oyster Bay Avenue N
Bremerton, WA 98312
Consultant Address
Parametnx
4660 Kitsap Way Surte A
Bremerton, WA 98312
I Waiver Failure to enforce any provision of ttus Agreement shall not be deemed a waiver
of that provision Waiver of any nght or power ansmg out of tlus Agreement shall not be deemed
waiver of any other nght or power
J Non-Waiver of Breach: The failure of the City to insist upon strict performance of any
of the covenants and agreements contamed herein, or to exercise any ophon herein conferred in
one or more mstances shall not be construed to be a waiver or relmquishment of said covenants,
agreements or ophons, and the same shall be and remam m full force and effect
K Compliance with Laws Consultant shall comply with all applicable Federal, State, and
local laws m performing its obligations under tlus Agreement
L Choice of Law and Venue This Agreement shall be mterpreted according to the laws of
the State of Waslungton Any �udicial action to resolve disputes ansing out of tlus Agreement
shall be brought m Krtsap County Superior Court
M Attorneys' Fees In the event of litigation to enforce any of the terms or provisions
herem, each party shall pay all its own costs and attorney's fees ,
N Assignment Any assignment of tlus agreement by the Contractor without the wntten
consent of the City shall be void
Bremerton/Parametrix
Manne Dnve LID Stormwater Retrofit
Page 5 of 13
VIII. Nondiscrimination: Consultant sha11 not discnmmate m employment or sernces to the
pubhc on the basis of race, color, national ongm, sex, religion, age, mantal status, disability, or
sexual onentation except for employment actions based'on bona fide occupahonal quahfication
IX. Termimation: This� Agreement shall remam m force unhl completion and acceptance of
the sernces, termmated by wntten mstrument upon mutual consent, or by the Crty of Bremerton
for converuence Tlus Agreement may be immediately terminated for cause by a Party if the other
Party substanhally fails to, perform through no fault , of the ternunatmg Party, and the non-
performmg Party does not commence correction of the failure of performance withm tlurty (30)
days of the termmating Party's sendmg notice to the non-performing Party Any Notice by
Consultant shall mclude a report showing the status of all rtems hsted in the Scope of Work current
through the termmation date r
If the Crty receives reimbursement by any federal, state, or other source for work descnbed in
Section I herem, and that , fundmg is withdrawn, reduced or hmrted m any way, or the pro�ect is
cancelled or substantially reduced after the execution date of tlus Agreement and pnor to the
complehon of the work, the City may summanly termmate this Agreement
A. Excusable Delays. The nght of Consultant to proceed shall not be termmated nor shall
Consultant be charged with hquidated damages for any, delays m the complehon of the work due
to 1) any acts of the federal govemment m controlling, restnchng, or requisrtionuig matenals,
equipment, tools, or labor by reason of war, national defense, or other national emergency, 2) any
acts of the City, rts consultants, or other public agencies causmg such delay, and 3) causes not
reasonably foreseeable by the parties at the time of the execuhon of the Agreement that are beyond
the control and wrthout the fault or negligence of the Consultant, mcluding, but not restncted to,
acts of God, fires, floods, stnkes, or weather of unusual seventy PROVIDED, HOWEVER, that
the Consultant must promptly notify the Crty witlun ten (10) calendar days m wnhng of the cause
of the delay If, on the basis of the facts and the terms of tlus Agreement, the delay is properly
excusable, the Crty shall, in wnhng, extend the hme for completing the work� for a penod of time
commensurate with the period of excusable delay
B. Rights Upon Termmation In the event of terminahon, the City shall pay for all
sernces performed by the Consultant to the efFective date of termmation, as descnbed on a final
mvoice submitted to the Crty After termmation, the City may take possession of all records and
data witlun the Consultant's possession pertairung to this pro�ect wluch may be used by the Crty
without restnchon Any such use not related to the pro�ect wluch Consultant was contracted to
perform shall be without liability or legal exposure to the Consultant
X. Suspension & Debarment For contracts involvmg Federal fundmg, Consultant hereby
certifies, by sigmng tlus agreement, that neither it nor its pnncipals are presently debarred,
suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation m tlus transachon by any Federal departm'ent or agency Consultant shall provide
immediate wntten notice to the City if at any tune rt learns that rt is or has become meligible for
certification Should Consultant enter mto a covered transaction with another firm, Consultant
agrees by sigrung this agreement that it will verify that the firm with whom rt intends to do
busmess is not debarred, suspended, meligible, excluded or disquahfied
Bremerton/Parametnx
Manne Dnve LID Stormwater Retrofit
Page 6 of 13
CITY OF BREMERTON
i: J�7�i�1/�
� n��
��. - ,
Approved as to formf
B erton City At�p�
C\Users\dwkudav�DesktopV�tanne Dnve�Manne Dr LID Retrofit PSA 021114 docx
0
Bremerton/Parametrix
Manne Dnve LID Stormwater Retrofit
Page 7 of 13
CONSULTANT
Crty Clerk �
Exhibit A- SCOPE OF WORK
PROJECT DESCRIPTION , '�
The City of Bremerton received fundmg from the Department of Ecology 201
Murncipal Stormwater Capacity Grant Program to design a stormwater low impact
development (LID) project Pro�ect critena and completion deadlines are specified,by
the grant The City's Pro�ect Manager for this will be the Stormwater Permit Coordmator
under the direction of the Water Resources Manager �'
The Marme Dnve LID Stormwater Retrofit wdl treat' and control runoff from
approximately 1 2 miles of urban roadway surface �nd more than 800,000 ft of ,
impervious surface using LID and nutrient-specific filtration The existing system collects
runoff from the southem portion of Manne Drive, a � portion of Rocky Pomt Road and
Kitsap Way, as well as runoff from surroundmg light commercial, residen#ial and school
impervious surFaces Water quality concems are pollutants from vehicles, yards, and
landscapes that contam polycychc aromatic hydrocarbons (PAHs), metals, fertdizers,
pesticides, and fecal coliform bactena This pro�ect w�ll help meet the Sinclair and Dyes
Inlet fecal Coliform TMDL by improving water quality in Oyster Bay and will be a part of
an effort to reopen curre'ntly ciosed commercial shellfish harvestmg in the area
Underground infiltration, filtration, bio-swales, and pervious concrete sidewalks will
reduce water quantity and improve water quality at the stormwater outFall Water quality
will be improved by integratmg nutnent-specific filters mto this system prior to the outFall
Pervious concrete sidewalks will be instailed to increase the mfiltration while also
providing safe areas for the local elementary school and residents in this high
pedestnan use area The design will mcorporate �fdtration systems, pervious concrete
sidewalks, and underground infiitration/detention pipe The system will be designed to
control, filter, and manage flow to the extent possible for the sod conditions
PROJECT GOALS
• Improve water quality ,
• Reduce the quantity of runoff mto Oyster Bay
• Develop a cost-effective design to use m retrofitting other City storm sewer
systems
• Less expensive maintenance
• Effectively treat stormwater runoff
• Reduce water quantity by infiltrating stormwater back into the ground
• Improve the area by adding pervious sidewalks and safe pedestrian routes
SPECIAL REQU@REMENTS
Pro�ect design will reference 2013-2015 Municipal �Stormwater Capacity Grant
Agreement No G1400319, Department of Ecology (DOE) Grant Program Guidelines
August 2013 (Publication no 13-1fl-032), and the Stormwater IVlanagement Manual for
Westem Washington (August 2012)
Bremerton/Parametnx
Marme Dnve LID Stormwater Retrofit
Page8of13
PROJECT TASKS
TASK 1 PROJECT MANAGEIVIENT AND MEETINGS
Parametnx Activities
• Manage budget and schedule
•, Hold face to face meetings and progress calls with City Pro�ect Manager as
needed and at key milestones
o Prepare monthly, progress reports and invoices ,
City Responsibihties
• Participate m progress calls and meetings
• Payment of submitted mvoices within 30 days
Deliverables
• Minutes from progress calis summarizmg key action items
• Monthly progress report and mvoice
Assumptions
• Up to four face to face meetings will be held with City staff including design
submittal review meetings and a presentation of the final design to Bremerton
Public Works and Utdities Department staff
• Pro�ect duration will be 10 months (February through November 2014)
TASK 2 DESIGN
Parametnx Activities
• Submit data requests to City
• Provide quality control reviews
• Retain a geotechnical subconsultant to perForm soil investigations and testing
according to the 2012 Ecology Manual Geotechrncal report will include
recommendations for soil infiltration rates and retairnng wall design
• Design pro�ect components to include
Infiltration trenches
Bioswales
Underground filtration basins using mixed media to treat identified
contammates of concern
Retainmg wall assessment and design ,
Pervious sidewaik sections for pro�ect area
Diversion weirs for existing manholes
Sediment and trash filtration pre-treatment structures
Prepared plan sheets as listed in Exhibit C
Bremerton/Parameh
Manne Dnve LID Stormwater Retrofit
Page 9 of 13
City Activities
.
Furnish avadable data requests, drav
Provide timely review of deliverables
Provide a loaner copy of pertinent st�
Deliverables
records, etc in a timely manner
planrnng documents
• Submit 4 copies of the pre-design report (inc(uding 30% design plans and
construction cost estimate) by March 31, 2014
• Submit 4 copies of the 90% design (plans, specifications, and estimate) by
July 30, 2014 '
• Submit 4 copies of the final design (100% plans, specifications, and estimate)
by October 31, 2014 The final design stiall incorporate changes pursuant to
comments received on the preliminary and 90% designs �'
• Submit operations and maintenance manual for the filtration systems,
sediment and trash removal system, bioswale, and pervious concrete
sidewalks by October 31,2014.
Assumptions
• Notice to proceed wdl be received on February 21, 2014
• Geotechnical drilhng can be accomphshed withm two weeks following notice
to proceed
• Feasibility of proposed design will be evaluated following geotechnical
mvestigation and design may be ad�usted with mput from the City and
Ecology prior to completion of 30% design
• Pre-design will be completed usmg prelimmary geotechrncal
recommendations
• City review for each submittal will be co �mpleted withm 2 weeks Ecology
review for 30% and 90% submittals wdl be completed within 45 days
• For each submittal, 4 hard copies wdl be submitted, plus electronic copies
with reports in MS Word and PDF formats, with spreadsheets in Excel format
Plans will be provided in half size (11x17) hard copies
TASK 3 BID PACI(AGE I �
I
Parametnx Activities
• Prepare Bid Package plans, specifications, contract documents, and
engmeers estimate incorporating City review comments to the final design
Dehverables I
• Submit 4 copies of the bid package by November 30, 2014
Assumptions '�,
• The City will provide the most current v i rsion of contract documents for use
by Parametrix
Bremerton/Parametrix
Manne Dnve LID Stormwater Retrofit
Page 10 of 13
• Four hard copies wdl be submitted, plus electrornc copies with reports in MS
Word and PDF formats, with spreadsheets m Excel format Plans will be
provided m half size (11x17) and full size (22x34) hard copies
TASK 4 MONITORING
Parametrix Activities
• Prepare Water Quality QAPP and perform stormwater sampling to determme
water quality baseline for pollutants of concem and to determme suitable filtration
media for filters
• Prepare a technical memorandum describmg the sampling results and
recommendations for appropriate filter media
Deliverables
• Submit 4 copies of the QAPP by March 7, 2014
• Submit 4 copies of the sampling results technical memorandum by Apnl 4, 2014
Assumptions
• Notice to proceed will be received on February 21, 2014
• QAPP approval by Ecology will not be reqwred
• A total of two stormwater grab samples plus 1 duplicate (3 total) wdl be
collected from the stormwater outfall at low tide Sampling dates wiA be
coordinated with the City
• All samples will be analyzed for diesel, motor oil, PAHs, prionty pollutant
metals, pesticides, herbicides, fecal coliforms, total dissoived solids, and total
suspended solids
• City review for the QAPP will be completed withm 1 week
• For each subm�ttal, 4 hard copies will be submitted, plus electronic copies
with reports in MS Word and PDF formats, with spreadsheets in Excel format
TASK 5 SURVEY
Parametrix Activities
• Perform a topographical survey of the two pro�ect areas sufficient for design and
develop a base map of each area
Deliverables
• Final topographical base maps for use m design plans
Assumptions
• Survey of approximately 300 to 400 lineal of roadway in each pro�ect area wdl
be performed, extending from approximately right of way line to right of way
line
Bremerton/Parametnx
Manne Dnve LID Stormwater Retrofit
Page 11 of 13
Survey will include boundary lines, topography;
and all utihty locations mcluding pipe inverts
TASK 6 DIRECTED SE�2VICES
Parametnx Activifies
• Perform additional services at the direction
Deliverables
• As directed by the City
Assumptions
• Work under this task will require pnor wnttei
TASK 7 SUBCONSULTA(�TS
Parametrix Activities
Retain subconsultants to perform
laboratory testing
Dehverables ,
• Submit geotechrncal report by March 15, �
• Laboratory report for �nclusion in samplmg
break lines, surface features,
the City
� direction from the City
studies, utdity locates, and
14
�sults technical memorandum
Assumptions
• Geotechnical investigation will mclude two sod bonngs to 30 feet each at each
pro�ect location (4 bormgs total) If groundwater is encountered in the borings,
one bonng at each pro�ect location will be completed as a monitoring well for the
purposes of groundwater level monitonng (maximum of finro wells)
• Up to finro soil samples wdl be collected from each sod bonng for testmg for grain
size analysis, cation exchange capacity, and organic content
• The cost for the geotechrncal studies includ�ed in Appendix C is an estimate and
will be refined during design
I
�,
�,
Bremerton/Pazametnx
Manne Dnve LID Stormwater Retrofit
Page 12 of 13
Exhibit B SCHEDULE
Notice to proceed
30% Design
90% Design ready for Ecology review
Final Design
Bid Package
Bremerton/Parametnx
February 21, 2014
March 31, 2014
July 30, 2014
October 31, 2014
November 30, 2014
Manne Dnve LID Stormwater Retrofit
Page13of13
PARAMETRIX EXHIBIT C- BUDGET y�
Project Marfne Drive Stormwater LID Retrofit
Ciient. City of Bremerton
P�# BILLUJO STA Sr Enp Enp III CAD SW2Eng StnCLCAD SurveyCNef Survey PC WP Aca.
233 MULT D Dhtl�uhn D Zavack J Patereen J MeM A Valenda B Pusey J KemniR L Stevero L ECwards V SoOeeu
TOTAL TOTAL
PNASE TA51( 325 BurAeireOlebprRele 577381 E10725 f709.30 E18028 S»67 515626 511898 58694 j9003 69688 MOURS COST
' 1 1 �d
Mee6ngs wlh City (up to 4) 8 8 18 32,248
R Man emenf 10 mo 20 10 10 40 SS 314
8ubtotal 28 8 10 10 56 f7,56�
1 2
PraDasl9� (�)
Basin Akip 4 4 8 =866
M�dmbgicAAodefn9lWWHM4) 8 8 E856
trifiWatlan Fad5h/ ��91��+M) �Z 12 51,287
Cover SAeetwHh VidnHy end Loc. A�ap 1 1 2 5217
Pvg. and Drainage PWn az�d Profile (2j 2 18 32 50 =5 581
IMiNa6on FadGlylPaumg DetaUs (2) 2 8 32 42 S4 703
30%ConsQuetlanCostENmate 2 8 10 57,208
Re-0eNgn Report 2 30 8 40 54�285
Deslgn (90% and final)
Cov� Sheetwdlh �Adnity mM Loc. 61�
Legand Abbr and Mdex 1 1 2 E283
S� Prep Dertro 3 Trefic Control Plan (2 2 18 24 42 34 867
TESC & Trefic CorNol Det�le 2 8 8 18 S2 080
Pvg and Drelnage Plan and Profile (2) 4 18 16 36 $4180
Ittfil7atlon fad�lylPavmg Detaib (3) 4 18 24 q4 SS p3q
Reta6iag We0 Plan and ElevaUon 1 24 24 49 57,760
Retalning WaII Dets'is 1 12 20 33 35 038
SHEETTOTAL 11
SpeaatPronsions 4 18 12 32 53482
Cost EatlmaOas 4 16 2 22 S2 591
OSMManual 2 18 4 22 f2424
Fxpenses �pp
SuMotal 33 197 142 38 44 �8 4M t57,053
1 l Pa�#�ge "
Bxl Set Drawinga 4 16 24 4 4 52 56,302
Bid Set Speaal Prov�swns 4 4 4 12 f1484
&dSetCo�actDocumOnffi 8 4 12 51751
En hieme Estlmate 4 8 �p s� �
Subtotel 2D 28 24 4 4 8 BB i11,090
1 4 � �
SampBnB W�PP 7 8 8 Y1032
SampEng Frold Wark 2 8 1D S1,2f16
SampNgResul�Tech Memo 2 8 10 51208
� � S20D
SuEtohl S 24 29 i3,643
t S " �
S�ovey and Base AMap 2 18 40 58 37 BW
Equ�p &Supp6es :qpp
Su6to 2 58 t8,007
Taaks 1 Nrough S Subtotal ge p51 166 40 48 10 34 10 70� 187,�56
Manne Dnve Budget 020514 xlsx pa9B �
,
,
PARAMETRIX EXHIBIT C- BUDGET vs�2o�a
PrOjeCt MaNne Drlve Stormwater LID Retrofit
Cllent City of Bremerton
PMX# BILLMG STAFF S� Erq Enp 111 CAD SW�1.Erq SNxl.CAD SurvOyCMef Survay PC WP AxG
233 1896-873 MULT D DUNuM D Zevack J Peteraon J MeM A Vek�da B Puaey J Kemnqz L Stevare L EAwarde V Solleeu
TOTAL TOTAL
PMASE T0.SI( 325 BurCe�reOLeborRate E77391 S1W25 570990 518428 E13267 St56.ffi 511898 58690 59003 59688 XOURS COST
1 6 SaN� �
0� � Sto 000
1 7
� 517500
Uh'HyLoc�es-APS =qpp
L�oratay - Onsim EnvtrammeMal 32,800
��� t20,500
DredCostFee %10) 52050
TotalSubconeultants i72,550
PROJECT TOTAL $��g,gps
Rep�ed By D Dinkuhn Rev By Ph� Strudc
(Project Mai�er) (Sanbr ConsupaM)
Manne Dnve Budget 020514 �sx
Page 2