Loading...
HomeMy WebLinkAbout5354r � Contract Number: Vendor: Sub�ect: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments : 5354 PARAMETRIX INC PSA - Marine Drive Stormwater LID Retrofit Water Resources LEG 12-1 2/19/2014 11/30/2014 9/1/2014 � PROFESSIONAL SERVICES AGREEMENT Engineering Design Services — Marine Drive Stormwater LID Retrofit Parametrix � � � {� � n1 � � U {V � , The City of Bremerton ("Crty") and Pazametnx ("Consultant"), refened to collectively as the "Parties," enter into the following Agreement for professional services I. Scope: The Consultant agrees to perform the sernces more specifically descnbed in the Scope of Work, dated February, 2014, includmg any attachments thereto, attached hereto as Exlubrt A, which is mcorporated by reference herem The Scope of Work may be modified only pursuant to Section VII G of this Agreement If the Scope of Work provides for unspecified addrtional sernces such sernces shall only be performed upon the express wntten request of the City Consultant further represents that the sernces funushed under this Agreement will be performed m accordance with generally accepted professional practices in effect at the tune such sernces are performed II. Term: The City and the Consultant agree that work will begm on the tasks described m Exhibit A immediately upon execuhon of tlus Agreement. The parties agree that the work descnbed m Exlubit A is to be completed as provided for m the work schedule attached hereto as Exlubrt B, provided however, that additional time shall be granted by the City for excusable delays or extra work as provided for in Sechon IX A of this agreement ` III. Compensation: In considerahon of the sernces provided pursuant to tivs Agreement, the City shall pay Consultant m an amount not to exceed $120,000 Consultant's charges and bills shall conform to the fee schedule attached hereto as Exhibit C and mcorporated herem by tlus reference. The Consultant shall submit regular billing statements detailing work performed and amount charged on each task or portion thereof The descriptions sha11 conform to and fall witlun the categones set out m the Scope of Work and/or Fee Schedule Upon receipt of a confornung billmg statement, the City shall promptly process payment PROVIDED, HOWEVER, the City reserves the nght to pnonhze scoped work and accelerate and/or delay work tasks under the time frame set forth in Section II herem The Consultant's labor rates and billing fees shall be as delmeated m Exlubrt C Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to tlus Agreement Consultant shall only be compensated for addrtional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be m accordance with Exlubit C If a billing statement does not conform to tlus Agreement, the City may withhold payment until the statement is brought into compliance Such withholdmg does not relieve Consultant of its obligations under this Agreement. Bremerton/Parametnx ' Manne Dnve LID Stormwater Retrofit Page 1 of 13 IV. Relationslup of P�rties: Consultant represents that it is skilled m the matters addressed m the Scope of Work and is perfornung independent functions and responsibihties v�ntlun rts field of e ertise. Consultant and rts personnel are mdependent Consultants and not employees of the �� �� � tant and its personnel have no authonty to bmd the City or to control the City's d other Consultants None of the benefits provided b� the City to its employees, includir►g, but not hmrted to, compensation, insurance, and unemployment msurance are available from the City to the employees, agents, representahves, or sub-Consultants of the Consultant Consultant will be solely and enhrely responsible for rts acts and for the acts of Consultant's agents, employees, representahves and sub-Consultants dunng the performance of tlus Agreement. The Crty may, during the term of tlus Agreement, engage other mdependent Consultants to perform the same or similar work As an mdependent Consultant, Consultant is responsible for its own management The City's administrahon and enforcement of this Agreement shall not be deemed an exercise of managenal control over Consultant or rts personnel As an mdependent Consultant, Consultant is responsible for payment of all taxes and hcensmg fees necessary to perform its obhgations under ttus Agreement. These taxes and fees mclude but are not limrted to State industnal msurance, Busmess & Occupation, State professional hcensmg, and Crty busmess hcensing If any t�es or fees due the City have been declared delmquent, the City may v�nthhold the delmquent amount, plus any additional charges arising from the dehnquency, from any payments due Consultant V. Indemnification: A Consultant shall defend, mdemmfy and hold the Crty, its officers, officials, employees, agents and volunteers harmless from any and all clauns, m�unes, damages, losses or suits, including all legal costs and attorney fees, ansing out of or in connection with Consultant's performance of tlus Agreement, unless Consultant is conduchng work pursuant to Subsection B below The Crty's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of mdemrufication B Arclutects Eng�neers and Any Other Professional Listed In and Perfornung Services Defined in RCW 42 24.115 Should a court of competent �unsdichon determine that Consultant's services provided pursuant to tlus Agreement is sub�ect to RCW 4 24 115, then, m the event of habilrty for damages ansmg out of bodily m�ury to persons or damages to property caused by or resulhng from the concurrent negligence of the Consultant and the Crty, its officers, oi�icials, employees, agents and volunteers, the Consultant's liabilrty hereunder shall be only to the extent of the Consultant's negligence IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE - INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WANER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE Bremerton/Parametnx Manne Dnve LID Stormwater Retrofit Page 2 of 13 PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER The provisions of tlus sechon shall survive the expiration or termination of tlus Agreement VI. Insurance: The Consultant shall procure and mamtam for the duration of the Agreement, insurance agamst claims for in�uries to persons or damage to property which may anse from or m connechon with the performance of the work hereunder by the Consultant, its agents, representahves, employees, sub-consultants or sub-Consultants Before begimm�g work on the pro�ect described m this Agreement, the Consultant shall provide a Certificate of Inswance evidencing: 1. Automobile Liabilitv uisurance with limits no less than $1,000,000 combined smgle limit per accident for bodily m�ury and property damage, and 2. Commercial General Liabilitv insurance wntten on an occurrence basis with lixnrts no less than $1,000,000 combined single limrt per occurrence and general aggregate for personal m�ury, bodily m�ury and property damage Coverage shall include but not be limrted to blanket contractual, products/completed operations/broad form property damage; explosion, collapse and underground (XCU) if applicable, and employer's hability, and - 3. Excess Liabilitv msurance with limits not less than 1,000,000 limit per occurrence and aggregate 4. Professional Liabilitv msurance with limits no less than $1,000,000 limit per occurrence/claim Any payment of deduchble or self-msured retention shall be the sole responsibility of the Consultant All required policies shall be provided on an"occurrence" basis except professional liabihty msurance (if required), wluch may be provided on a"claims-made" basis The City shall be named as an addrtional msured on the Commercial General Liabihty msurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the Crty, wluch names the Crty as an addrtional insured shall be attached to the Certificate of Insurance The City reserves the nght to receive a certified copy of all the required insurance policies and endorsements The City further reserves the nght to re�ect any unacceptable policies and/or endorsements The Consultant's Commercial General Liability msurance shall contam a clause stating that coverage shall apply separately to each msured agamst whom claim is made or suit is brought, except with respects to the limits of the insurer's liability The Consultant's msurance shall be pnmary msurance as respects the City and it shall be an�rmative obligation upon Consultant to advise the City's Risk Manager by fax at (360) 473- 5161, or by certified mail, return receipt requested to City of Bremerton, Attn Risk Management, Bremerton/Parametnx Manne Dnve LID Stormwater Retrofit Page3of13 345 6�' Street, Surte 600, Bremerton, WA 98337 wrtlun two days of the cancellahon, suspension or substantive change of any insurance policy set out herem, and faslwe to do so shall be construed to be a breach of tlus Agreement The City also reserves its unquahfied nght to require at any tune and for any reason, proof of�coverage m,the form of a duphcate of the msurance pohcy with a11 endorsements as evidence of coverage. � - VII. General Conditions: A Reports and Informahon When requested by the City, Consultant shall funush periodic reports and documents on matters covered by this A�greement The reports and documents shall be furrushed m the time and form requested Consultant shall mamtain accounhng records m accordance wrth Generally Accepted Accountmg Pruiciples (GAAP) to substantiate all billed amounts B Ownerslup and Use of Records and Documents Onginal documents, drawuigs, designs and reports, mcludmg those m electromc format, developed under tlus Agreement are the property of the City All wntten mformation submitted by the City to the Consultant m connection wrth the services performed by the Consultant under tlus Agreement will be safeguarded by the Consultant to at least the same extent as the Consultant,safeguards like informahon relatmg to its own busmess If such information is publicly available or is already m Consultant's possession or known to it, or is nghtfully obtamed by the Consultant from third parties, Consultant shall bear no responsibilrty for rts disclosure, madvertent or otherwise All data, documents and files created by Consultant under this Agreement may be stored at Consultant's office in Bremerton, Waslungton Consultant shall make such data, documents, and files available to the Crty upon rts request at all reasonable times for the purpose of edihng, modifying and updatmg as necessary until such time as the City is capable of storuig such mformation m the City's offices Duplicate copies of this mformation shall be provided to the City upon its request, and at reasonable cost All documents, including all reports, drav�nngs, specificahons, computer soflware or other items prepared or funushed by Consultant pursuant to tlus Agreement, are mstruments of service with respect to the pro�ect' and are the property of the City Any reuse by the City for other than the specific purpose mtended will be at Crty's sole nsk C Work Performed at Consultant's Risk Consultant shall take all precauhons necessary and sha11 be responsible for the safety of rts employees, agents, and sub-consultants m the performance of the work hereunder and shall urihze a11 protection necessary for that purpose All work shall be done at Consultant's own nsk, and Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used o'r held for use m connechon with the work. D Place of Work The Consultant shall perform the work authonzed under this Agreement at its offices iri Bremerton, Waslungton. Meehngs wrth the City staff as described m Bremerton/Parametnx Manne Dnve LID Stormwater Retrofit Page 4 of 13 Exlubit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties , E Ent�re A�reement• Tlus Agreement and rts Exhibrts constitutes the ent�re agreement between the Parhes, and the Parties acknowledge that there are no other agreements, wntten or oral, that have not been set forth m the text of tlus Agreement F Severabilitv Should any part of tlus Agreement be found void, the balance of the Agreement shall remaui in full force and effect G Modification Tlus Agreement may only be modified by wntten instrument signed by both Parties H Wntten Notices All commurucahons regardmg tlus Agreement shall be sent to the parties at the addresses listed below by registered or 1 st class mail, or by personal service, and shall be deemed sui�iciently given if sent to the addressee at the address stated m tlus Agreement or such other address as may be hereafter specified in wntmg. Crty Address Public Works and Utilities 100 Oyster Bay Avenue N Bremerton, WA 98312 Consultant Address Parametnx 4660 Kitsap Way Surte A Bremerton, WA 98312 I Waiver Failure to enforce any provision of ttus Agreement shall not be deemed a waiver of that provision Waiver of any nght or power ansmg out of tlus Agreement shall not be deemed waiver of any other nght or power J Non-Waiver of Breach: The failure of the City to insist upon strict performance of any of the covenants and agreements contamed herein, or to exercise any ophon herein conferred in one or more mstances shall not be construed to be a waiver or relmquishment of said covenants, agreements or ophons, and the same shall be and remam m full force and effect K Compliance with Laws Consultant shall comply with all applicable Federal, State, and local laws m performing its obligations under tlus Agreement L Choice of Law and Venue This Agreement shall be mterpreted according to the laws of the State of Waslungton Any �udicial action to resolve disputes ansing out of tlus Agreement shall be brought m Krtsap County Superior Court M Attorneys' Fees In the event of litigation to enforce any of the terms or provisions herem, each party shall pay all its own costs and attorney's fees , N Assignment Any assignment of tlus agreement by the Contractor without the wntten consent of the City shall be void Bremerton/Parametrix Manne Dnve LID Stormwater Retrofit Page 5 of 13 VIII. Nondiscrimination: Consultant sha11 not discnmmate m employment or sernces to the pubhc on the basis of race, color, national ongm, sex, religion, age, mantal status, disability, or sexual onentation except for employment actions based'on bona fide occupahonal quahfication IX. Termimation: This� Agreement shall remam m force unhl completion and acceptance of the sernces, termmated by wntten mstrument upon mutual consent, or by the Crty of Bremerton for converuence Tlus Agreement may be immediately terminated for cause by a Party if the other Party substanhally fails to, perform through no fault , of the ternunatmg Party, and the non- performmg Party does not commence correction of the failure of performance withm tlurty (30) days of the termmating Party's sendmg notice to the non-performing Party Any Notice by Consultant shall mclude a report showing the status of all rtems hsted in the Scope of Work current through the termmation date r If the Crty receives reimbursement by any federal, state, or other source for work descnbed in Section I herem, and that , fundmg is withdrawn, reduced or hmrted m any way, or the pro�ect is cancelled or substantially reduced after the execution date of tlus Agreement and pnor to the complehon of the work, the City may summanly termmate this Agreement A. Excusable Delays. The nght of Consultant to proceed shall not be termmated nor shall Consultant be charged with hquidated damages for any, delays m the complehon of the work due to 1) any acts of the federal govemment m controlling, restnchng, or requisrtionuig matenals, equipment, tools, or labor by reason of war, national defense, or other national emergency, 2) any acts of the City, rts consultants, or other public agencies causmg such delay, and 3) causes not reasonably foreseeable by the parties at the time of the execuhon of the Agreement that are beyond the control and wrthout the fault or negligence of the Consultant, mcluding, but not restncted to, acts of God, fires, floods, stnkes, or weather of unusual seventy PROVIDED, HOWEVER, that the Consultant must promptly notify the Crty witlun ten (10) calendar days m wnhng of the cause of the delay If, on the basis of the facts and the terms of tlus Agreement, the delay is properly excusable, the Crty shall, in wnhng, extend the hme for completing the work� for a penod of time commensurate with the period of excusable delay B. Rights Upon Termmation In the event of terminahon, the City shall pay for all sernces performed by the Consultant to the efFective date of termmation, as descnbed on a final mvoice submitted to the Crty After termmation, the City may take possession of all records and data witlun the Consultant's possession pertairung to this pro�ect wluch may be used by the Crty without restnchon Any such use not related to the pro�ect wluch Consultant was contracted to perform shall be without liability or legal exposure to the Consultant X. Suspension & Debarment For contracts involvmg Federal fundmg, Consultant hereby certifies, by sigmng tlus agreement, that neither it nor its pnncipals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation m tlus transachon by any Federal departm'ent or agency Consultant shall provide immediate wntten notice to the City if at any tune rt learns that rt is or has become meligible for certification Should Consultant enter mto a covered transaction with another firm, Consultant agrees by sigrung this agreement that it will verify that the firm with whom rt intends to do busmess is not debarred, suspended, meligible, excluded or disquahfied Bremerton/Parametnx Manne Dnve LID Stormwater Retrofit Page 6 of 13 CITY OF BREMERTON i: J�7�i�1/� � n�� ��. - , Approved as to formf B erton City At�p� C\Users\dwkudav�DesktopV�tanne Dnve�Manne Dr LID Retrofit PSA 021114 docx 0 Bremerton/Parametrix Manne Dnve LID Stormwater Retrofit Page 7 of 13 CONSULTANT Crty Clerk � Exhibit A- SCOPE OF WORK PROJECT DESCRIPTION , '� The City of Bremerton received fundmg from the Department of Ecology 201 Murncipal Stormwater Capacity Grant Program to design a stormwater low impact development (LID) project Pro�ect critena and completion deadlines are specified,by the grant The City's Pro�ect Manager for this will be the Stormwater Permit Coordmator under the direction of the Water Resources Manager �' The Marme Dnve LID Stormwater Retrofit wdl treat' and control runoff from approximately 1 2 miles of urban roadway surface �nd more than 800,000 ft of , impervious surface using LID and nutrient-specific filtration The existing system collects runoff from the southem portion of Manne Drive, a � portion of Rocky Pomt Road and Kitsap Way, as well as runoff from surroundmg light commercial, residen#ial and school impervious surFaces Water quality concems are pollutants from vehicles, yards, and landscapes that contam polycychc aromatic hydrocarbons (PAHs), metals, fertdizers, pesticides, and fecal coliform bactena This pro�ect w�ll help meet the Sinclair and Dyes Inlet fecal Coliform TMDL by improving water quality in Oyster Bay and will be a part of an effort to reopen curre'ntly ciosed commercial shellfish harvestmg in the area Underground infiltration, filtration, bio-swales, and pervious concrete sidewalks will reduce water quantity and improve water quality at the stormwater outFall Water quality will be improved by integratmg nutnent-specific filters mto this system prior to the outFall Pervious concrete sidewalks will be instailed to increase the mfiltration while also providing safe areas for the local elementary school and residents in this high pedestnan use area The design will mcorporate �fdtration systems, pervious concrete sidewalks, and underground infiitration/detention pipe The system will be designed to control, filter, and manage flow to the extent possible for the sod conditions PROJECT GOALS • Improve water quality , • Reduce the quantity of runoff mto Oyster Bay • Develop a cost-effective design to use m retrofitting other City storm sewer systems • Less expensive maintenance • Effectively treat stormwater runoff • Reduce water quantity by infiltrating stormwater back into the ground • Improve the area by adding pervious sidewalks and safe pedestrian routes SPECIAL REQU@REMENTS Pro�ect design will reference 2013-2015 Municipal �Stormwater Capacity Grant Agreement No G1400319, Department of Ecology (DOE) Grant Program Guidelines August 2013 (Publication no 13-1fl-032), and the Stormwater IVlanagement Manual for Westem Washington (August 2012) Bremerton/Parametnx Marme Dnve LID Stormwater Retrofit Page8of13 PROJECT TASKS TASK 1 PROJECT MANAGEIVIENT AND MEETINGS Parametnx Activities • Manage budget and schedule •, Hold face to face meetings and progress calls with City Pro�ect Manager as needed and at key milestones o Prepare monthly, progress reports and invoices , City Responsibihties • Participate m progress calls and meetings • Payment of submitted mvoices within 30 days Deliverables • Minutes from progress calis summarizmg key action items • Monthly progress report and mvoice Assumptions • Up to four face to face meetings will be held with City staff including design submittal review meetings and a presentation of the final design to Bremerton Public Works and Utdities Department staff • Pro�ect duration will be 10 months (February through November 2014) TASK 2 DESIGN Parametnx Activities • Submit data requests to City • Provide quality control reviews • Retain a geotechnical subconsultant to perForm soil investigations and testing according to the 2012 Ecology Manual Geotechrncal report will include recommendations for soil infiltration rates and retairnng wall design • Design pro�ect components to include Infiltration trenches Bioswales Underground filtration basins using mixed media to treat identified contammates of concern Retainmg wall assessment and design , Pervious sidewaik sections for pro�ect area Diversion weirs for existing manholes Sediment and trash filtration pre-treatment structures Prepared plan sheets as listed in Exhibit C Bremerton/Parameh Manne Dnve LID Stormwater Retrofit Page 9 of 13 City Activities . Furnish avadable data requests, drav Provide timely review of deliverables Provide a loaner copy of pertinent st� Deliverables records, etc in a timely manner planrnng documents • Submit 4 copies of the pre-design report (inc(uding 30% design plans and construction cost estimate) by March 31, 2014 • Submit 4 copies of the 90% design (plans, specifications, and estimate) by July 30, 2014 ' • Submit 4 copies of the final design (100% plans, specifications, and estimate) by October 31, 2014 The final design stiall incorporate changes pursuant to comments received on the preliminary and 90% designs �' • Submit operations and maintenance manual for the filtration systems, sediment and trash removal system, bioswale, and pervious concrete sidewalks by October 31,2014. Assumptions • Notice to proceed wdl be received on February 21, 2014 • Geotechnical drilhng can be accomphshed withm two weeks following notice to proceed • Feasibility of proposed design will be evaluated following geotechnical mvestigation and design may be ad�usted with mput from the City and Ecology prior to completion of 30% design • Pre-design will be completed usmg prelimmary geotechrncal recommendations • City review for each submittal will be co �mpleted withm 2 weeks Ecology review for 30% and 90% submittals wdl be completed within 45 days • For each submittal, 4 hard copies wdl be submitted, plus electronic copies with reports in MS Word and PDF formats, with spreadsheets in Excel format Plans will be provided in half size (11x17) hard copies TASK 3 BID PACI(AGE I � I Parametnx Activities • Prepare Bid Package plans, specifications, contract documents, and engmeers estimate incorporating City review comments to the final design Dehverables I • Submit 4 copies of the bid package by November 30, 2014 Assumptions '�, • The City will provide the most current v i rsion of contract documents for use by Parametrix Bremerton/Parametrix Manne Dnve LID Stormwater Retrofit Page 10 of 13 • Four hard copies wdl be submitted, plus electrornc copies with reports in MS Word and PDF formats, with spreadsheets m Excel format Plans will be provided m half size (11x17) and full size (22x34) hard copies TASK 4 MONITORING Parametrix Activities • Prepare Water Quality QAPP and perform stormwater sampling to determme water quality baseline for pollutants of concem and to determme suitable filtration media for filters • Prepare a technical memorandum describmg the sampling results and recommendations for appropriate filter media Deliverables • Submit 4 copies of the QAPP by March 7, 2014 • Submit 4 copies of the sampling results technical memorandum by Apnl 4, 2014 Assumptions • Notice to proceed will be received on February 21, 2014 • QAPP approval by Ecology will not be reqwred • A total of two stormwater grab samples plus 1 duplicate (3 total) wdl be collected from the stormwater outfall at low tide Sampling dates wiA be coordinated with the City • All samples will be analyzed for diesel, motor oil, PAHs, prionty pollutant metals, pesticides, herbicides, fecal coliforms, total dissoived solids, and total suspended solids • City review for the QAPP will be completed withm 1 week • For each subm�ttal, 4 hard copies will be submitted, plus electronic copies with reports in MS Word and PDF formats, with spreadsheets in Excel format TASK 5 SURVEY Parametrix Activities • Perform a topographical survey of the two pro�ect areas sufficient for design and develop a base map of each area Deliverables • Final topographical base maps for use m design plans Assumptions • Survey of approximately 300 to 400 lineal of roadway in each pro�ect area wdl be performed, extending from approximately right of way line to right of way line Bremerton/Parametnx Manne Dnve LID Stormwater Retrofit Page 11 of 13 Survey will include boundary lines, topography; and all utihty locations mcluding pipe inverts TASK 6 DIRECTED SE�2VICES Parametnx Activifies • Perform additional services at the direction Deliverables • As directed by the City Assumptions • Work under this task will require pnor wnttei TASK 7 SUBCONSULTA(�TS Parametrix Activities Retain subconsultants to perform laboratory testing Dehverables , • Submit geotechrncal report by March 15, � • Laboratory report for �nclusion in samplmg break lines, surface features, the City � direction from the City studies, utdity locates, and 14 �sults technical memorandum Assumptions • Geotechnical investigation will mclude two sod bonngs to 30 feet each at each pro�ect location (4 bormgs total) If groundwater is encountered in the borings, one bonng at each pro�ect location will be completed as a monitoring well for the purposes of groundwater level monitonng (maximum of finro wells) • Up to finro soil samples wdl be collected from each sod bonng for testmg for grain size analysis, cation exchange capacity, and organic content • The cost for the geotechrncal studies includ�ed in Appendix C is an estimate and will be refined during design I �, �, Bremerton/Pazametnx Manne Dnve LID Stormwater Retrofit Page 12 of 13 Exhibit B SCHEDULE Notice to proceed 30% Design 90% Design ready for Ecology review Final Design Bid Package Bremerton/Parametnx February 21, 2014 March 31, 2014 July 30, 2014 October 31, 2014 November 30, 2014 Manne Dnve LID Stormwater Retrofit Page13of13 PARAMETRIX EXHIBIT C- BUDGET y� Project Marfne Drive Stormwater LID Retrofit Ciient. City of Bremerton P�# BILLUJO STA Sr Enp Enp III CAD SW2Eng StnCLCAD SurveyCNef Survey PC WP Aca. 233 MULT D Dhtl�uhn D Zavack J Patereen J MeM A Valenda B Pusey J KemniR L Stevero L ECwards V SoOeeu TOTAL TOTAL PNASE TA51( 325 BurAeireOlebprRele 577381 E10725 f709.30 E18028 S»67 515626 511898 58694 j9003 69688 MOURS COST ' 1 1 �d Mee6ngs wlh City (up to 4) 8 8 18 32,248 R Man emenf 10 mo 20 10 10 40 SS 314 8ubtotal 28 8 10 10 56 f7,56� 1 2 PraDasl9� (�) Basin Akip 4 4 8 =866 M�dmbgicAAodefn9lWWHM4) 8 8 E856 trifiWatlan Fad5h/ ��91��+M) �Z 12 51,287 Cover SAeetwHh VidnHy end Loc. A�ap 1 1 2 5217 Pvg. and Drainage PWn az�d Profile (2j 2 18 32 50 =5 581 IMiNa6on FadGlylPaumg DetaUs (2) 2 8 32 42 S4 703 30%ConsQuetlanCostENmate 2 8 10 57,208 Re-0eNgn Report 2 30 8 40 54�285 Deslgn (90% and final) Cov� Sheetwdlh �Adnity mM Loc. 61� Legand Abbr and Mdex 1 1 2 E283 S� Prep Dertro 3 Trefic Control Plan (2 2 18 24 42 34 867 TESC & Trefic CorNol Det�le 2 8 8 18 S2 080 Pvg and Drelnage Plan and Profile (2) 4 18 16 36 $4180 Ittfil7atlon fad�lylPavmg Detaib (3) 4 18 24 q4 SS p3q Reta6iag We0 Plan and ElevaUon 1 24 24 49 57,760 Retalning WaII Dets'is 1 12 20 33 35 038 SHEETTOTAL 11 SpeaatPronsions 4 18 12 32 53482 Cost EatlmaOas 4 16 2 22 S2 591 OSMManual 2 18 4 22 f2424 Fxpenses �pp SuMotal 33 197 142 38 44 �8 4M t57,053 1 l Pa�#�ge " Bxl Set Drawinga 4 16 24 4 4 52 56,302 Bid Set Speaal Prov�swns 4 4 4 12 f1484 &dSetCo�actDocumOnffi 8 4 12 51751 En hieme Estlmate 4 8 �p s� � Subtotel 2D 28 24 4 4 8 BB i11,090 1 4 � � SampBnB W�PP 7 8 8 Y1032 SampEng Frold Wark 2 8 1D S1,2f16 SampNgResul�Tech Memo 2 8 10 51208 � � S20D SuEtohl S 24 29 i3,643 t S " � S�ovey and Base AMap 2 18 40 58 37 BW Equ�p &Supp6es :qpp Su6to 2 58 t8,007 Taaks 1 Nrough S Subtotal ge p51 166 40 48 10 34 10 70� 187,�56 Manne Dnve Budget 020514 xlsx pa9B � , , PARAMETRIX EXHIBIT C- BUDGET vs�2o�a PrOjeCt MaNne Drlve Stormwater LID Retrofit Cllent City of Bremerton PMX# BILLMG STAFF S� Erq Enp 111 CAD SW�1.Erq SNxl.CAD SurvOyCMef Survay PC WP AxG 233 1896-873 MULT D DUNuM D Zevack J Peteraon J MeM A Vek�da B Puaey J Kemnqz L Stevare L EAwarde V Solleeu TOTAL TOTAL PMASE T0.SI( 325 BurCe�reOLeborRate E77391 S1W25 570990 518428 E13267 St56.ffi 511898 58690 59003 59688 XOURS COST 1 6 SaN� � 0� � Sto 000 1 7 � 517500 Uh'HyLoc�es-APS =qpp L�oratay - Onsim EnvtrammeMal 32,800 ��� t20,500 DredCostFee %10) 52050 TotalSubconeultants i72,550 PROJECT TOTAL $��g,gps Rep�ed By D Dinkuhn Rev By Ph� Strudc (Project Mai�er) (Sanbr ConsupaM) Manne Dnve Budget 020514 �sx Page 2