HomeMy WebLinkAbout5349 Contract Number: 5349
Vendor: PAPE & SONS CONSTRUCTION, INC.
Subject: Washington Avenue Sewer Improvements
Department-.: Engineering
File Class: LEG 12-1
Begin Date: 1/3/2014
End Date: 12/31/2014
Review Date: 1/1/2015
Vault Date: 2015
Comments: CO #1 12/11/14
� CITY OF BREMERTON .
CHANGE ORDER
CONTRACT CHANGE ORDER NO: � �
PROJECT NAME: Washington Avenue Sewer Improvements
PROJECT NO: 4508/5313 CONTRACTOR: Pape and Sons
ORIGINAL CONTRACT AMOUNT: $1,587,538.45 DAYS: 217
PREVIOUSLY APPROVED CHANGES: �0.00 DAYS: 0
THIS CHANGE: ($48,726.44) DAYS: � 3
REVISED CONTRACT AMOUNT: $1,538,812.01 DAYS: 220
This Change Order covers changes to the subject contract as described herein. The Contractor shall
construct, furnish equipment and materials, and perform all work as necessary or required to
complete the Change Order Items. The increase or decrease in contract price shown below includes
any applicable taxes.
DESCRIPTION OF CHANGES INCREASE IN (DECREASE) CONTRAC
CONTRACT IN CONTRACT T TIME
� `� AMOUNT AMOUNT EXTENSIO
� �
" " ($) ($) N (DAYS :)
> >
� �
X X This is the final closeout change order for the project to zero out 0 ($48,726.44) 3
the quantities and establish the final contract amount. There
were three bid schedules for the project and both tax ru1e170
and 171 applied. The contract included a force account
allowance in each bid schedule for any extra work that was
required. See the attached summary of the extra work items
and final quantities for the project.
Note that there was also an increase in sales tax from 8.6% to
8.7% at the beginning of the contract time.
NET CHANGE IN CONTRACT AMOUNT 3
INCREASE OR (DECREASE)
REVISED CONTRACT AMOUNT $1,538,812.01
ESTIMATED SALES TAX AT 8.7% $95,188.13 �
(SCHEDULE B &C ONLY)
TOTAL INCLUDING SALES TAX $1,634,000.14 220
Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims
of any kind or nature arising from or connected with any work either covered or affected by this
Change Order, including, without limitation, claims related to contract time, on-site or home office
overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for
past performance.
CONTRACT CHANGE ORDER NO: �
PROJECT NAME: Washington Avenue Sewer Improvements
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the
contract price specified for each item, including any and all supervision costs and other miscellaneous
costs relating to the change in work, and as to the extension of time allowed, if any, for completion of
the entire work due to said Change Order.
This document will become a supplement of the contract and all provisions will apply hereto. It is
understood that this Change Order shall be effective when approved by the City of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a change order
that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform
the surety of this change, and shall take appropriate action to modify any bonds required under the
contract to address this change.
CONTRACTOR
�
- r'
Approved: DATE:�/2����
PROJECT MA AGER
/ . Ib � /��
Recommended: DATE. ! I
CITY ENGINEER
Council action is required as project cost will exceed approved budget. ❑ Yes ■ No
Council action is required as change exceeds Mayors authority per BMC 2.76.110. ❑ Yes ■ No
Recommende � DATE: ►o i �I�-
DIRECTOR O BLIC ORKS AND UTILITIES -
Recommended: DATE: jb T �
MAYOR
Approved: � DATE:��l/�,�
APPROVED AS TO FORM: ATTEST:
1 V" �
Bremerton Ci Attorney City Clerk
Page 2 of 2
Contract Number.
Vendor.
Sub�ect:
Department:
File Class:
Begin Date:
End Date
Review Date
Vault Date.
Comments.
5349
PAPE & SONS CONSTRUCTION, INC.
Washington Avenue Sewer Improvements
Engineering
LEG 12-1
1/3/2014
11/30/2014
12/1/2014
1
1
1
1
1
'
'
1
i
1
�
'
'
'
'
,
�
,
'
���
�
�
CITY CLERK
�u� �:M ���
f, <� ���
°' ' � : � � F
Contract Documents for
WA SHI NG TON A VENUE
SEWER IMPROVEMENTS
NO VEMBER 2013
City of Bremerton Project No. 5313
Bid Openmg
Pre-Bid Conference
Contact Person
December 2, 2013 @ 1 00 P M
City Clerk's Office
City Hall, 345 6th Street
Bremerton, WA 98337
November 20, 2013 @ 10 00 A M
3027 Olympus Drive
Bremerton, WA 98310
Ned Lever, P E
3027 Olympus Dnve
Bremerton, WA 98310
Tel (360) 473-2398
Fax (360) 473-5398
,
�l
1
THIS PAGE LEFT INTENTIONALLY BLANK
1
�
�
1
�
�
�
�
�
'
�
�
�
��
'
C�ty of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
23fr189fr113 (01/04) �
November 2013
e
r
r
r
Engoneer:
� Pazametrix
4660 K�tsap Way, Surte A
Bremerton, WA 98312
�
�
r
�
�
■J
�
�
�
�
�
'
'
.,, , ,
November 22, �8��6°
.2o r3
Owner.
City of Bremerton
345 6`� Street
Bremerton, WA 98337
� . � � . , � � . ;�, �,
To All Holders of the Biddmg Documents, Contract SpecificaUons, and Construchon Drawings
This Addendum forms a part of the Contract Documents and modifies the Biddmg Documents, Contract
Specifications, and Construction Drawmgs for the opemng date of December 3, 2013
Acknowledge receipt of this addendum on the Proposal Failure to do so may sub�ect the Bidder to
disqualification This addendum consists of ,,���,
� Pages of text (mcludmg this cover sheet)
Prepared by
Damon McAlister, P E
1
Checked y. _ __ _ ____ ______
id Di �
Approved by _ ___ ____ _ ` �_ _..�. __ _ __
Brian Bunker, P E
� City of Bremerton
Washi'regton Aver+ue Sewer /mprwements
Addendwn No 1
A-1
. , ... _. ... r a.
236-1896-I13
November 11, 20l3
'
ADDENDUM NO. 1
WASHINGTON AVENUE SEWER IMPROVEMENTS
REVISIONS TO CONTRACT DOCUMENTS
BIDDING DOCUMENTS
1. Cover Page
a REPLACE the B�d Openmg date wrth the followmg
"December 3, 2013 @ 1 00 P M"
2. Notice Invit�ng B�ds (Page I-1)
a REPLACE the Bid Openmg date m the first paragraph with the following
"DECEMBER 3, 2013"
b REPLACE the Engmeer's estimate range in the fifth paragraph with the followmg
"$1 7M and $2 OM"
3. BID PROPOSAL (Pages BF-11 through BF-16)
a REPLACE wrth the attached revised Bid Proposal Changes �n bid rtems and bid quantrties are
highlighted in gray
CONTRACT SPECI�ICATIONS
1. Drvision 1— Sect�on 1-0511(1) Substanhal Complet�on Date (Page III-27)
a ADD the following sentence to the end of the third paragraph
"Phys�cal completion of the work for final mspection shall occur w�thin 30 days of the
Substant�al Completion for each phase of work ident�fied under Spec�al Provision 1-04 12 —
Phased Substantial Completion "
2. Division 1— Section 1-07.15 Temporary Water Pollution/Erosion Control (Page III-33)
a ADD the following
"Contractor shall take necessary measures to prevent surface water and groundwater from
migratmg mto contammated so�l areas found m the field by the Contractor durmg construction
Payment for these water control measures shall be included m the lump sum bid item
`Erosion/Water Pollutton Control' Payment for collecting, handlmg, and disposmg of the
contammated water will be paid for under a separate force account "
Ciry of Bremerton 236-1896-1 /3
Washrngton Avenue Sewer Improvements A-2 November 22 2013
Addendum No 1
t
0
r
C
�
�
'
�
,
'
r
�
,
1
�
'
�
3. Division 1— Section 1-07.30 Field Office (Pages III-46 through 48)
a REPLACE the second sentence of the first paragraph with the followmg
"The field office shall provide a mmimum 240 square feet and an 8-foot ceilmg height for the
exclusive use of the Engineer and the Engineer's staff "
b REPLACE the first sentence of the second paragraph w�th the followmg
"The field office shall be a weather-tight buildmg, e�ther portable or permanent structure, a
mmimum eight (8) feet wide, havmg at least one door "
c REPLACE Items a, b, e, and f in the fifth paragraph with the following
"a Conference table, 30 mches by 72 mches (one)
b Office desk cha�rs, new (two) and foldmg chairs (two)
e Three (3) shelf bookcase, 15 mches deep by 36 mches w�de, (one)
f Fee standmg closet w�th shelvmg and lockable door "
d DELETE Item i(iv) and Item k from the fifth paragraph
4. D�vision 2— Section 2-02.3(5) Remove/Abandon Existmg Sewer System (Page III-69)
a REPLACE the second paragraph wrth the followmg
"Sewer pipe that �s abandoned in place shall have a concrete plug mstalled m all openmgs The
length of plug shall equal twice the diameter of the p�pe "
5. D�vision 2— Section 2-09.3(1)G Trench Dewatermg (Page III-74)
a DELETE th�s section m rts entirety This section was �n conflict with Sect�on 7-08 3(1)D Trench
Dewatering
6. D�vision 2— Section 2-09.3(9) Removal and IDisposal of Contammated Mater�al (Pages III-74
and 75)
a ADD the followmg to the fourth paragraph titled "Contaminated Water "
"Contractor shall sample and test the contaminated water for gasolme and benzene, toluene,
ethylbenzene and xylenes (BTEX) usmg method NWTPH-Gx/EPA 8021B, diesel and lube oil
usmg method NWTPH-Dx, and total suspended sol�ds usmg method EPA 160 2 Contammated
water meeting the follow�ng criter�a may be disposed of at the City's wastewater treatment plant,
using the samtary sewer conveyance system, w�th prior approval from the Engineer
• Turb�d�ty — Less than 100 nephalometric turbidity umts (NTUs)
• Total Suspended Sol�ds — Less than 266 milLgrams per lrter (mg/1)
• Benzene — Less than 0 07 mg/1
• Ethylbenzene — Less than 1 7 mg/1
• Toluene — Less than 1 4 mg/1
i � Ctry of Bremerton
Wash�ngfon Avenue Sewer Improvements
Addendum No !
� I
A
136-/896-/ l3
Navember 11 2013
• Gasolme — Less than 1 mg/1
• D�esel — Less than 1 mg/1
Contammated failing any of the above criteria for petroleum but meet�ng a criterion of less than
10 mg/1 total petroleum hydrocarbons (the sum of the md�vidual petroleum constituents listed
above) may be trucked and disposed of at the City's wastewater treatment plant directly, with
prtor approval from the Engineer
Samplmg will be conducted daily (one sample per day) on an mit�al bas�s until the nature of the
contammation is understood No dewatermg water shall be discharged to the samtary sewer until
test results for that day's dewatermg have been received Turbidrty will be measured at the time
of sample collect�on usmg a portable turbidity meter Laboratory analysis will be conducted on a
24-hour turnaround basis to provide an assessment of contamtnant levels as soon as reasonably
attamable Samplmg frequency w�ll be reduced to once a week followmg the first four sampling
days if the m�t�al results show the discharge is in compliance More frequent samplmg may be
implemented as appropriate All turb�dity measurements and sample collection information shall
be recorded m a log book that will be provided to the Engmeer at the end of the Work All
turbidity and analytical data shall be provided to the Engmeer as data are available so that t�mely
decisions regardmg dewatermg water disposal can be made and delays avo�ded
7. Div�sion 2— Section 2-09.4 Measurement (Page III-75)
a ADD the following paragraphs
"No separate measurement w�ll be made for trench dewatermg "
S Div�sion 2— Section 2-09.5 Payment (Page III-75)
a DELETE the followmg from the payment descnption for b�d rtem "Contammated Material
Excavation Incl Haul"
"and water"
"collect�ng, handmg, and stormg contammated water,"
b ADD the followmg paragraphs
"Contaminated Water Handlmg and Disposal", by force account as provided in Sect�on 1-09 6
All costs associated with collectmg, handling, and stormg of contammated water, test�ng of
contammated water, and transportmg and disposmg of contaminated water to an approved fac�lity
will be paid by force account under item `Contaminated Water Handlmg and Disposal "'
9 Division 7— Section 7-22.3(2) Installation Standards (Page III-124)
a ADD the following paragraph
"S�mplex and duplex grmder pump alarm panels shall include the E/One Sentry Advisor
(Standard Features only) for remote momtormg of the system "
Gty of Bremerton
Washrngton Avenue Sewer /mprovements
Addendum No 1
A-4
236-/896-/ /3 �
November 22 2013 '
'
r
� 10. Division 7— Sect�on 7-22.3 1 General a e III-124
� ) � g )
�
'
'
,
C
�
�
,
'
'
�
'
�
�
�
a REPLACE wrth the followmg
"Simplex and duplex grmder pump assemblies shall be mstalled per City of Bremerton Standard
Details 6042, 6101, 6102, 6103, 6104, 6110, 6111, and 6112
Contractor shall submit an Electrical Plan for C�ty rev�ew and approval that outtmes the electrical
work for each residence The Plan shall mclude a scope of work for each service and a
construct�on cost estimate The electrical work w�ll mclude electrical panel upgrades and building
interior routing, as identified in Section 7-22 3(5), trenchmg and backfill of conduit and cabling
between the electrical panel and the control panel, as well as to the grinder pump, mountmg the
control panel to the building exter�or, and all other associated electrical �mprovements
Preparation of the Electr�cal Plan shall be reimbursed under the "Mobilization" bid rtem
Landscape restoration will be paid for under bid item "Landscape Repair — Grinder Pumps "
Contractor shall be sure to �dentify their electr�cal subcontractor in the List of Subcontractors
form at hme of bid "
11 Division 7— Section 7-22.3(3) Call for Inspection (Page III-126)
a DELETE the first and second sentence of the first paragraph
b ADD the following to the first paragraph
"No City perm�t fees will be requ�red for the gnnder pump installat�ons Costs for L&I
mspections shall be paid for under the "_ Grinder Pump Assembly, Complete" b�d �tems and
not the electr�cal force account "
12. D�vision 7— Section 7-22.3(5) Residence Electrical Panel Upgrade (Page III-126)
a ADD the followmg paragraph
"The electrical panels at residences at 916, 944, and 952 Washmgton Avenue are located at
inter�or walls and/or in basements, and not along an exterior wall All electrical work required to
provide power to the grmder pump control panel from the electrical panel shall be reimbursed
under `Electrical Panel Upgrade and Winng' force account "
13. D�vision 7— Section 7-22.5 Payment (Page III-127)
a DELETE the last two paragraphs and REPLACE with the followmg
"`Electrical Panel Upgrade and Wiring', by force account as provided m Sechon 1-09 6
Payment for upgradmg the electr�cal panels at ex�stmg res�dences m order to accommodate
grinder pump assembly construction, trench�ng and backfill of condurt and cabling, mountmg the
control panel to the buildmg exterior, and all other associated electrical work necessary for
mstallmg the gr�nder pump assemblies will be paid by force account m accordance with
Section 1-09 6 To provide a common basis of B�d, the Owner has entered an amount m the
Proposal for `Electr�cal Panel Upgrade and W�rmg' to become part of the Contractor's total Bid "
� Ctry of Bremerton
Washrngton Avenue Sewer /mprovements
Addendum No 1
A-S
236-/896-113
November22 20/3
'
14. D�viston 8— Section 8-02.5 Payment (Page III-131)
a REPLACE wrth the followmg
" `Landscape Repa�r', per lump sum
The lump sum contract price for "Landscape Repa�r" shall constitute full pay for all labor,
materials, toois, and equipment necessary and mc�dental for the restoration of landscape features
damaged and/or d�sturbed durmg construction on private properties and Evergreen Park, not
includmg those restdential propert�es along the eastside of Washington Avenue Surface
restorat�on shall be as specified on the Plans and Standard Spec�ficat�ons, and shall also include
the replacement of all irr�gahon system components m Evergreen Park and coordmation wrth
Bremerton Parks and Recreat�on
`Landscape Repair — Grinder Pumps', per force account
Payment shall be paid by farce account in accordance with Section 1-09 6
Work under th�s force account b�d item shall also include restoration of all landscape features on
fourteen (14) private properties along the eastside of Washmgton Avenue that are to have grinder
pump assemblies Work shall include, but not be limited to restaration of lawns, rockeries,
concrete walls, sidewalks, driveways, brick walkways, fences, and other landscape features "
15. D►v�sion 8— Sect�on 8-14.3 Construction Requ�rements
a Supplement Section 8-14 3 ofthe WSDOT Standard Specifications with the following
"Crushed surfacing top course material shall be including m the construction of the sidewalks and
driveway approaches per City of Bremerton Standard Deta�ls 3101 and 3121 A 4-inch layer of
crushed surfacmg top course mater�al shall also be mcluded m the construct�on of all ADA ramps
Cost for the crushed surfacmg top course material shall be mcluded m the sidewalk, driveway,
and ADA ramp b�d rtems "
16 D�vision 8— Section 8-14.5 Payment
a Supplement Sect�on 8-14 5 of the WSDOT Standard Specificat�ons with the following
"Payment for the crushed surfac�ng top course material shall be mcluded m the sidewalk,
driveway, and ADA ramp bid rtems "
17. Drvis�on 9— Section 9-05.23 High-Dens�ty Polyethylene (HDPE) Pipe (Page III-135)
a REPLACE the th�rd bullet of the second paragraph wrth the followmg
"Gravrty Pipe for Sewer Mams SDR 17 "
APPENDIX B— CITY OF BREMERTON STANDARD DETAILS
1. Detai16120 — Collection Valve Box Clean-Out Standard Detad
a REPLACE the check valve, ball valve mside the valve box wrth an E/ONE Stainless Steel Lateral
Krt, 1-1/4", fittmgs as reqwred
Crty af Bremerton 136-1896-/13
Wash�ngton Avenue Sewer /mprovements A-6 November 22 10/3
Addendum No /
'
'
�J
CONSTRUCTION DRAWINGS
1. Sheet G3.1— Sheldon Blvd Roadway and Ut�lit�es, Demolit�on and Tesc Plan, STA 1+00 to 7+50
a Legend — DELETE "REMOVE AND DISPOSE OF FULL DEPTH ASPHALT PAVEMENT
' AND SUBGRADE (REFER TO ROADWAY SECTION PLANS)" and REPLACE wrth
"REMOVE AND DISPOSE OF FULL DEPTH ASPHALT AND CONCRETE
PAVEMENTS AND SUBGRADE (REFER TO ROADWAY SECTION PLANS)"
, 2. Sheet G3.2 — Sheldon Blvd Roadway and Utdities, Demolihon and Tesc Plan, STA 7+50 to
11+75
' a Legend — DELETE "REMOVE AND DISPOSE OF FULL DEPTH ASPHALT PAVEMENT
AND SUBGRADE (REFER TO ROADWAY SECTION PLANS)" and REPLACE w�th
"REMOVE AND DISPOSE OF FULL DEPTH ASPHALT AND CONCRETE
PAVEMENTS AND SUBGRADE (REFER TO ROADWAY SECTION PLANS)"
'
,
'
'
�
,
3. Sheet C1.1— Water and Sanitary Sewer, Sheldon Boulevard STA 0+00 to 4+00, Plan and
Prof le
a ADD a Fire Hydrant Assembly per COB Std Deta�l #5081 at STA 1+70, 18 00'LT, mcludmg an
8"x6" Tee (MJxFL) and 6" GV (FLxMJ) at the 8-mch Water Ma�n
4. Sheet C1.2 — Water and Sanitary Sewer, Sheldon Boulevard STA 4+00 to 7+50, Plan and
Profile
a REVISE the p�pe mater�al of the 15 LF 6" SS Lateral from PE to PVC at McKenz�e Avenue
STA 1+30
b ADD a 22 LF 6" SS Lateral (PE), w�th a 6" Cap, IE=124 65 at STA 5+66 46, 17 00' RT per
Sewer Construct�on Note #4
5. Sheet C1.3 — Water and Sanitary Sewer, Sheldon Boulevard STA 7+50 to 11+75, Plan and
Profile
a NOTE, the exist�ng PSE power pole at STA 9+18, 18' LT will be relocated north by
' approx�mately 4 feet by PSE Contractor shall coordmate construction efforts with PSE and the
City
!�
�
,
�
'
6. Sheet C1.9 — Water and San�tary Sewer, McKenz�e Avenue, Plan and Profile
a DELETE the sewer pipe call-out and 8" Sol�d Sleeve (MJ) and REPLACE wrth the followmg
"135 LF, 8" SS (C900 PVC), S=0 55%"
7. Sheet C1.10 — Water and San�tary Sewer, Cogean Avenue, Plan and Profile
a DELETE the sewer pipe call-out and 8" Sol�d Sleeve (MJ) and REPLACE with the followmg
"88 LF, 8" SS (C900 PVC), S=2 48%"
City of Bremerton 236-1896-113
Washrngton Avenue Sewer /mprovements A-7 November 22 20/3
Addendum No l
'
8. Sheet C2.1— Trench Detads - �
a Concrete Roadway Restorat�on, Section C— ADD the followmg to the dowel bar note
"TRANSVERSE JOINT LOCATIONS SHALL MATCH EXISTING CONCRETE
PAVEMENT, WITH A MAXIMUM JOINT SPACING OF 10 FEET NO TIE BARS WILL BE
REQUIRED ON THE LONGITUDINAL JOINT THAT RUNS PARALLEL TO THE TRENCH
WHERE MATCHING TO EXISTING "
9. Sheet C2.2 — Water and Sanitary Sewer Details
a Shallow Manhole, Deta�l 1— REPLACE with the attached deta�l
10. Sheet C5.4 — Wash�agton Avenue, Sewer Lateral Connect�on Plan
a Sewer Lateral Trench Deta�l 1— DELETE the call-out "SEWER LATERAL PIPE" and replace
w�th the following
"SEWER LATERAL PIPE/ELECTRICAL CONDUIT"
b Sewer Lateral Trench Detail 1— ADD the follow�ng note ,
"MINIMUM 24-INCH COVER OVER SEWER LATERAL PIPE AND ELECTRICAL
CONDUIT"
a
Ciry of Bremerton
Washengton Avenue Sewer Improvements
Addendum No 1
A
236-/896-1 !3 �
November 21 20/3
'
'
'
'
'
�
�
�
�
�
'
,
'
�
�
�
L�
�
BID PROPOSAL
BASE BID (SCHEDULES A, B, AND C)
November 2013
The followmg proposal has both lump sum and unit pnce bid items In the final column of each
schedule, write out the price in dollars and cents using numerals
Sales Tax — The Bidder shaA �nclude sales tax m the Bid Item price per Section 1-07 2(1) —
State Sales Tax Rule 171 for all items m Schedule A
Item Estimated Total
No Section Descri tion Quanti Unit Price Amount
SCHEDULE A — ROADWAY IMPROVEMENTS
A-1 1-04 Minor Chan es and Force Account EST $40,000 $40,000
A-2 1-09 Mobdization LS $ $
A-3 SP 1-10 Pro ect Tem ora Traffic Control LS $ $
A-4 SP 2-02 Removal of Structures and LS $ $
Obstructions
A-5 SP 2-02 Pothole Existin Utdit 10 EA $ $
A-6 SP 2-02 As halt Conc Pavement Removal 1,113 SY $ $
A-7 SP 2-02 Cement Conc Pavement Removal 2,218 SY $ $
A-8 SP 2-02 Cement Conc Sidewalk and $ $
Dnvewa Removal 547 SY
A-9 SP 2-02 Cement Conc Curb and Gutter 1,686 LF $ $
Removal
A-10 SP 2-02 Remove/Abandon Storm S stem LS $ $
A-11 SP 2-02 Ad ust Existin Utdit to Grade 5 EA $ $
A-12 2-03 Roadwa Excavation Incl Haul 876 CY $ $
A-13 SP 2-09 Shorin or Extra Excavation Class B LS $ $
A-14 SP 2-09 Contaminated Material Excavation 750 TN $ $
Incl Haul
A-15 SP 2-09 Contaminated Water Handimg and FA $20,000 $20,000
Dis osal
A-16 SP 2-12 Geo rid Reinforcement 2,813 SY $ $
A-17 SP 4-04 Crushed Surfacm To Course 1,467 TN $ $
A-18 SP 5-04 Cold Mix 70 TN $ $
A-19 SP 5-04 HMA CI 1/2 In PG 64-22 542 TN $ $
A-20 5-05 Cement Conc Pavement 21 CY $ $
A-21 SP 7-04 Solid Wall PVC Storm Sewer Pi e, 18 LF $ $
C�ty of Bremerton 236-1896-113 (01/04)
, Wash�ngton Avenue Sewer Improvements BF-11 November 2013
Contract Documents — Addendum No 1 B�d Proposal
u
Item Estimated Total
No Section Descri tion Quant� Unit Price Amount
61n Diam
A-22 SP 7-04 Solid Wall PVC Storm Sewer Pipe, 383 LF $ $
81n Diam
A-23 SP 7-05 Catch Basm, T e 1 13 EA $ $
A-24 SP 7-08 CDF Backfdl 10 CY $ $
A-25 SP 8-01 Erosion/Water Pollution Control LS $ $
A-26 SP 8-02 Landsca e Re air LS $ $
A-27 SP 8-04 Cement Conc Curb and Gutter 856 LF $ $
T eA
A-28 SP 8-04 Cement Conc Curb T e C1 830 LF $ $
A-29 SP 8-06 Cement Conc Dnveway Approach, 17 SY $ $
' T e III
A-30 SP 8-13 Surve Monument 8 EA $ $
A-31 SP 8-14 Cement Conc Sidewalk 473 SY $ $
A-32 8-14 Cement Conc Curb Ramp Type 3 EA $ $
Per endicular
A-33 8-14 Cement Conc Curb Ramp Type 3 EA $ $
Parallel
A-34 8-14 Cement Conc Curb Ramp Type 3 EA $ $
Combination
A-35 SP 8-22 Pavement Markin LS $ $
TOTAL SCHEDULE A Items A1—A35) $
,
�
�
�
�
'
C�ty of Bremerton 236-1896-113 (01/04)
Washmgton Avenue Sewer lmprovements BF-12 November 2013 �
Contract Documents — Addendum No 1 Bid Proposal
L�
�
'
�
�
�
'
'
'
�
LJ
�
S
'
�
�
�
�
Sales Tax - The Bidder shall not include sales tax in the individual bid Item prices of
Schedules B and C, but as a total for all items under each Schedule, per Section 1-07 2(2) -
State Sales Tax Rule 170
Item Estimated Unit Total
No. Section Descri tion Gluantit Price Amount
SCHEDULE B - SANITARY SEWER
B-1 1-04 4 Minor Changes and Force Account EST $50,000 $50,000
B-2 1-09 Mobdization LS $ $
B-3 SP 1-10 Pro�ect Temporary Traffic Control LS $ $
B-4 SP 2-02 Removal of Structures and Obstructions LS $ $
B-5 SP 2-02 Cement Conc Pavement Removal 331 SY $ $
B-6 SP 2-02 Cement Conc Sidewalk and Driveway $ $
Removal 240 SY
B-7 SP 2-02 Remove/Abandon Sewer System LS $ $
B-8 SP 2-02 Pothole Existing Utdity 10 EA $ $
B-9 SP 2-09 Shoring or Extra Excavation Class B LS $ $
B-10 SP 5-04 Cold Mix 70 TN $ $
B-11 5-05 Cement Conc Pavement 102 CY $ $
B-12 SP 7-05 Manhole 24 In Diam , Shallow 7 EA $ $
B-13 SP 7-05 Manhole 48 In Diam , Type 2 7 EA $ $
8-14 SP 7-05 Sarntary Sewer Manhole Lirnng 2 EA $ $
B-15 SP 7-08 Unsuitable Pipe Foundation Excavation 20 CY $ $
Incl Haul
B-16 SP-7-08 CDF Backfdl 10 CY $ $
e-17 SP 7-17 PVC Sarntary Sewer Pipe 8 In Diam 286 LF $ $
B-18 SP 7-17 C900 PVC Sanitary Sewer Pipe 23 LF $ $
61n Diam
B-19 SP 7-17 C900 PVC Sanitary Sewer Pipe 223 LF $ $
81n Diam
�8- �'-�-1-� 8A-L�
B-20 SP 7-17 PE Sewer Pipe 10 In Diam 759 LF $ $
B-21 SP 7-17 PE LPS Main 4 In Diam 66�LF $ $
�3- �=a-� 2-€A $ $�
g-22 SP 7-17 1 In Air and Vacuum Release Valve 1 EA $ $
Assembl
C�ty of Bremerton 236-1896-113 (O1/04)
' , Wash�ngton Avenue Sewer Improvements BF-13 November 2013
Contract Documents — Addendum No 1 B�d Proposal
,
Item Estimated Unit Total
No Sect�on Descri tion Quanti Price Amount
B-23 SP 7-17 Slip-Lining 4 In Diam 674 LF $ $
B-24 SP 7-18 PVC Sanitary Sewer Lateral Pipe 161 LF $ $
41n Diam
B-25 SP 7-18 PVC Sanitary Sewer Lateral Pipe 48 LF $ $
61n Diam
B-26 SP 7-18 PE San�tary Sewer Lateral Pipe 6 In Diam 22 LF $ $
8-27 SP 7-18 PE LPS Lateral 1-1/4 in Diam 784 LF $ �
B-2g SP 7-18 Single LPS Lateral Service Connection $ $
1-1/4 In Diam 14 EA
8-29 SP 7-19 LPS Main End-of-Run Cleanout 1 EA $ $
41n Diam
B-30 SP 7-19 PVC Grav�ty Mam Sewer Cleanout 2 EA $ $
81n Diam
6-31 SP 7-22 Simplex Gnnder Pump Assembly, 11 EA $ $
Com lete
B-32 SP 7-22 Duplex Gnnder Pump Assembly, 3 EA $ $
Com lete
B-33 SP 7-22 Electrical Panel Upgrade ancl Winng FA $70,000 $70,000
B-34 SP 8-01 Erosion/VNater Pollution Control LS $ $
B-35 SP 8-14 Cement Conc Sidewalk 240 SY $ $
B-36 SP 8-02 Landscape Repair — Gnnder Pumps FA $50,000 $50,000
TOTAL SCHEDULE B Items B1—B36 $
Sales Tax 8 6% $
Schedule B Total $
Cdy of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements BF-14 November 2013 �
Contract Documents — Addendum No 1 B�d Proposal
❑
�
,
�
�
�
'
'
�
�J
�
,
�
,
�
'
L�
,
Estimated Unit Total
Item No Sect�on Descri tion Quanti Pr�ce Amount
SCHEDULE C — WATER
C-1 1-04 4 Minor Changes and Force Account EST $40,000 $40,000
�-2 1-09 Mobdization LS $ $
C-3 SP 1-10 Pro�ect Temporary Traffic Control LS $ $
C-4 SP 2-02 Cement Conc Pavement Removal 1,387 SY $ $
C-5 SP 2-02 Cement Conc Sidewalk and Dnveway 221 SY $ $
Removal
C-6 SP 2-02 Cement Conc Curb and Gutter Remova! 194 !F $ $
�-7 SP 2-02 Remove/Abandon Water System LS $ $
�-g SP 2-02 Pothole Existing Utdity 10 EA $ $
�-g SP 2-09 Shonng or Extra Excavation Class B LS $ $
C-10 SP 5-04 Cold Mix 158 TN $ $
C-11 5-05 Cement Conc Pavement 231 CY $ $
C-12 SP 7-08 Unsu�table Pipe Foundation F�ccavation 20 CY $ $
Incl Haul
C-13 SP 7-08 CDF Backfdl 10 CY $ $
C-14 7-09 D I Pipe (Restrained Joint) for 14 LF $ $
Water Main 3 In Diam
C-15 7-09 D I Pipe (Restrained Jomt) for 11 LF $ $
Water Main 4 In Diam
C-16 7-09 D I P�pe (Restrained Joint) for 49 LF $ $
Water Main 6 In Diam
C-17 7-09 D I Pipe (Restrained Joint) for 2,765 LF $ $
Water Main 8 In Diam
C-18 SP 7-12 Gate Valve 4 In 2 EA $ $
C-19 SP 7-12 Gate Valve 6 In 1 EA $ $
C-20 SP 7-12 Gate Valve 8 In 22 EA $ $
C-21 SP 7-14 Hydrant Assembly 4 EA $ $
C-22 SP 7-15 Single Service Connection 1 In Diam 28 EA $ $
C-23 SP 7-15 Smgle Service Connection 2 In Diam 1 EA $ $
C-24 SP 7-17 2-In Blowoff Assembly 2 EA
C-25 SP 8-01 Erosion/Water Pollution Control LS $ $
C-26` SP 8-14 Cement Conc Sidewalk 205 SY $ $
Cdy of B►emerton 236-1896-113 (01/04)
1 Wash�ngton Avenue Sewer Improvements BF-15 November 2013
Contract Documents — Addendum No 1 Bid Proposal
L�J
�
Estimated Unit Total
Item No Section Descri tion Quanti Price Amount
C-27 SP 8-04 Cement Conc Curb and Gutter Type A 194 LF $ $
C-28 SP 8-06 Cement Conc Dnveway Approach, 16 SY $ $
T e III
C-29 8-14 Cement Conc Curb Ramp Type Parallel 7 EA $ $
C-30 8-14 Cement Conc Curb Ramp 2 EA $ $
T e Combination
C-31 8-14 Cement Conc Curb Ramp 1 EA $ $
T e Sin le Direction
TOTAL SCHEDULE C Items C1—C31 $
Sales Tax 8 6% $
Schedule C Total $
BASE BID PROPOSAL SUMMARY
Schedule A— Roadwa Subtotal Items A1—A35 $
Schedule B— Subtotal Items B1—B36 Plus Sales Tax $
Schedule C— Water Subtotal Items C1—C31 Plus Sales Tax $
BASE BID GRAND TOTAL $
'
�
'
'
�
�
L�'
�
�
!�
'
�
�
�
�
�
C�ty of Bremerton 236-1896-113 (01/04)
Wash�ngton Avenue Sewer Improvements BF-16 November 2013 �
Contract Documents — Addendum No 1 B�d Proposal
'
SHALLOW TRENCH PER
24"x6" FRAME AND COVER
PER COB STD DETAIL #6005
RISERS AS REQUIRED,
%4" GROUT SMOOTH
INSIDE AND OUT �
48" DIA
CONCENTRIC
MANHOLE CONE
10" SEWER (PE)
� a
• _ � a •� .
�
.' <w�w• .
' p�9
• • � PIpE �IE.
. , .
"a • • .
e
' ' a • ., . . �
� . ,: . .
FINISHED GRADE
, . ; '�
b
• . a, � ' ' � - ' : • '•a , ENCASE WITH 3,000 PSI
•a , a
°'� • CONC FOLLOWING PIPE
• . a .• .
r ' ' � � INSTALLATION
� z a" • . , a ' .
`° �I� .' . , , °.
� . .a !
a•
6 „ � ..�
i MIN
PIPE PENETRATIONS, FIELD MODIFY
STRUCTURE AND GROUT WATER TIGHT
�//\�//\� CAST CHANNEL WITH
\\��� � 3,000 PSI CONC, NO
GRAVEL OR BLOCK FILL,
3 /4 DEPTH OF PIPE
PREPARED SUBGRADE
SHALLOW MANHOLE
DETAIL �1
NO SCALE NP
Parametrix DATE November22 2013 FILE BR7896113F12
Addendum 1
Shallow Manhole Detail
Detail 1, Sheet C2.2
Washington Avenue Sewer Improvements
City of Bremerton
PRED-BID CONFERENCE AGENDA
November 20, 2013
CITY OF BREMERTON
Washington Avenue Sewer Improvements
TIMELINE FOR WORK
e Award and NTP — Award in late December and NTP the first week of lanuary
• Phased Substantial Completion — Work on Sheldon around the park complete by May 15t
and uplands work on Washington by the end of July
• Window for construction on beach —June 15th to August 31, 2013
• Contract Time - 210 calendar days
• Addenda —There will be an addendum issued this week The bid opening date will be
moved to December 3 rd
P�o�ect Description - The primary goal of the pro�ect is to remove service connections from the
6" cast iron beach main that runs between the boardwalk and Evergreen Park Phase 1
removes services north of the Mannette Bridge Phase 2 will remove services south of the
bridge and allow us to abandon the pump station at the end of Highland drive in 2015 The
pro�ect includes gravity sewer and low pressure sewer construction, water main construction,
roadway demolition and construction, sidewalk and ADA ramp construction and grinder pump
installation on private property
Staging Areas and Beach Access — There are two staging areas identified The area located at
the corner of 13th and Cogean must be vacated prior to the final paving of Sheldon The area at
the end of Highland is ad�acent to the new 9/11 memorial so an accommodation to the public
access will be required
Park Access and Business Access — There are two parking areas for the park that are accessed
through the pro�ect One of these parking areas must be accessible at all times Note the
signage requirements to ensure that the public is aware which parking area is open There are
a limited number of businesses in the work zone but we need to minimize the impacts to the
businesses
Installation of grinder pumps on private property —The work may require electrical panel
upgrades and hand work We need to maintain a good relationship with the owners who will
be impacted
Shallow sewer construction —The sewer in Sheldon has minimal cover Pay special attention to
the both utility and road constructability issues related to that sewer replacement
During the Site Walk, it was noted there is a private development currently under design
between McKenzie Avenue and Cogean Avenue abutting the south side of Sheldon Boulevard
This pro�ect may be permitted and begin construction during the Sheldon Boulevard pro�ect
work
�
'
'
'
�
Questions and Answers
1. Question: How is the disposal of contaminated soils addressed? Can contaminated
water be discharged to the sanitary sewer
Answer: There is a unit price item for disposal of contaminated soils The disposal
of contaminated water will be addressed by the addendum
2 Question: What is the antiapated flow from the the upstream pump station�
Answer: Pump Station CE-3 discharges at 200 gpm The pump station runs at
' regular intervals as there is a flushing pump that flushes the beach main The flushing
pump can be shut down for short periods of time to accommodate tie-ins but will need
to be put back in service to protect the beach main from plugging
'
'
'
�
1
1
'
�
'
'
�
u
3. Question: Is the contractor responsible for paying for the residential sewer permits?
Answer• No, the City will prepare the permits for the contractor to pick up at no
cost This will be clarified in the addendum
4. Question: There is a transition from HDPE pipe to C-900 pipe in a number of
locations This results in a lip in the invert due to the reduced inside diameter of the
HDPE which could be a problem Is this acceptable?
Answer: It is antiapated that either C-900 or HDPE will be selected for each run to
eliminate the transition This will be evaluated and addressed in the addendum
5. Question: There is a PSE guy pole located on the north side of Sheldon that will be
encroaching into the roadway How will this be addressed?
Answer: The City will coordinate with PSE for the pole relocation during the
pro�ect This will be addressed by the addendum
6. Question: To what extent are dowels to be used when pourmg concrete panels?
Answer. Dowels are required at each end of new and replacement concrete
panels in the transverse �oints This will be addressed in the addendum
7. Question: How is the landscape restoration to be quantified so the contractor can
understand the scope of the work?
Answer: The residential landscape restoration associated with the grinder pump
service laterais will be modified in the contract to be a force account item This will be
addressed in the addendum
8. Question: The �ob shack requirements seem excessive Are these requirements
really intended�
Answer: The City will evaluate the requirements for the �ob shack This will be
addressed by the addendum
�
P roiect: Washington Avenue Sewer Improvements
Date• 20-Nov-13
Location: Olympus Drive-Large Conference Room
Name/Please Print Company Phone Email
G�L/r� •�✓ 7 3 " / 6 / � r� �X �i�I� A�-""�iu � �4
�O Q- . 5 U . ��G- Y73 !`o sso c'a � ' �'.
c sou G.r''� 373 /!0/3 .yvw.�tn.d e�s� �aa-XC.�t✓.t:iv.v co.�r
�i./ � -c�3 �4- ,.- .
r � �
� yZO�Nt.�/ �L�s �.. �r�o •S3a- sa � au�s i�v� , co.�
�; j �. �t�, c a.- � so � s 2S3 - tSS't �- (t� 0 �t o L•: [ � � c � �.t , to �
C Mo�sQ.. ��� (v zae-�3o-��ti°t Lw. �5�.�.�,h��.�s.�.o�
-re ct ��C d�' f� �/� .'r r" . 4
fcJ �' O� a ^ O ac
. .�G'r 6 - S3 f' �GoS` ` G'
A i �0-73� -6?�3' ��E, aYs �C .•�4u�-,ei�s . c��
.s' ,�'f�',� .�'f�l�F'"�'S�'s < s�,� .r5�'3 �';"� �dY
� � ,GO .
! � � � � � 1� � � � � � � _ _ _ � � 0
'
'
,
'
'
ENGINEER'S CERTIFICATE
The techrnca} material and data contained �r� these Specificattons for the CEty of 8remertan
pro�ect Utled Washington Avenue Sewer imprauements, were prepared under the supenr�sian
and direct�on o# the undersAgned, whose seai, as a profess��onal engmeer E�censed ta pract�ce as
such, �s aff�xed below _..� '_ _
' �
Pre ared t� � .�°
1 P Y
Daman McAl�ster, P E
L�'
'
'
,
'
�...�
�
Prepared by�
Ther s S th, P E
� Rev�ewed by
Br�an E Bunker, P � _ _ _
� �
1
�
,
,
�
�
Approved by
�
/��,.
City ot 8rearr�rton
YVashmgton Avenuo Sewer lmprvvements
Gontr�ct Qacuments
�'�`£.. '�:
.r
2ss- �a�s r i3 �o � foa�
NoVr�mber 2073
�
`
THIS PAGE LEFT INTENTIONALLY BLANK
C�ty of Breme�ton 236-1896-113 (Ol/04)
Washington Avenue Sewer Improvements iv November 2013
Contract Documents
�
'
1
'
'
,
'
'
O
�
�
'
�
� i
'
�
�
�
'
'
'
�
,
,
,
,
'
�
,
'
�
'
�
'
'
�
TABLE OF CONTENTS
ENGINEER'S CERTIFICATE
PART I- BIDDING REQUIREMENTS AND CONTRACT FORMS PAGE
NOTICE INVITING BIDS I-1
BIDDER CHECKLIST I-3
BID FORMS BF-1 to BF-30
CONTRACT FORMS CF-1 to CF-16
PART II - AMENDMENTS TO TWE STANDARD SPECIFICATIONS
PART III - SPECIAL PROVISIONS
DIVISION 1 — GENERAL REQUIREMENTS
DIVISION 2 — EARTHWORK
DIVISION 3— AGGREGATE PRODUCTION AND ACCEPTANCE
DIVISION 4 — BASES
DIVISION 5— SURFACE TREATMENTS AND PAVEMENTS
DIVISION 6 — STRUCTURES
DIVISION 7— DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS,
WATER MAINS, AND CONDUITS
DIVISION 8 — MISCELLANEOUS CONSTRUCTION
DIVISION 9 — MATERIALS
STANDARD PLANS (AUGUST 5, 2013)
APPENDICES
A
B
C
D
E
KITSAP COUNTY PREVAILING WAGE RATES
CITY OF BREMERTON STANDARD DETAILS
WSDOT STANDARD PLANS
CONSTRUCTION FORMS
GEOTECHNICAL REPORT FOR SHELDON BOULEVARD
' C�ty of Breme►ton
Wash�ngton Avenue Sewer Improvements
Contract Documents
i
PAGE
I I I-3
I I I-65
I I I-79
I I I-81
I I I-83
I I I-91
I I I-93
III-129
III-135
III-141
236-1896-113 (01/04)
November2013
Table of Contents
�I
�
THIS PAGE LEFT INTENTIONALLY BLANK `
City of Bremerton 236-189fN113 (Ol/04)
Washington Avenue Sewer lmprovements u November 2013
Contrect Documents Table of Contents
,
'
'
'
'
PART I
' BIDDING REQUIREMENTS AIVD CONTRACT FORMS
'
�
'
�
�
�
'
��
'�
'
'
'
'
0
'
THIS PAGE LEFT INTENTIONALLY BLANK
'
'
�
'
'
'
'
,
l�
,
CITY OF BREMERTON, WASHINGTON
NOTICE INVITING BIDS
RECEIPT OF BIDS Sealed Bids will be received at the office of the City Clerk of the City of
Bremerton, located at 345 6th Street, Bremerton, Washmgton 98337 untd 1 00 p m PST as
shown on the wall clock inside the City Clerk's office on DECEMBER 2, 20�3, for the pro�ect
Washmgton Avenue Sewer Improvements Bids received after the specified time and date
wdl not be considered
OPENING OF BIDS• The bids wdl be pubiicly opened and read after 1 00 p m on DECEMBER 2, 2013,
in the office of the City Clerk at 345 6th Street, Bremerton, Washington 98337
COMPLETION OF WORK The WORK must be completed within 210 calendar davs after the
commencement date stated in the Notice to Proceed
DESCRIPTION OF WORK The WORK to be completed under this Contract generally consists
of replacing 800 feet of sewer main with 10-inch-diameter HDPE and 500 feet of sewer main
with 8-inch-diameter PVC pipe, constructing 800 feet of new 4-mch-diameter HDPE sewer pipe
slip-Imed through an 8-inch-diameter ductde iron water main that wdl be abandoned as part of
this pro�ect, 2,500 feet of 8-inch-diameter ductile iron water mam, 14 individual grinder pump
stations with 1,100 feet of 1-1/4-inch-diameter HDPE pressure sewer lateral pipe, and the
demolition of 1,000 feet of existing concrete pavement roadway along Sheldon Boulevard and
reconstruction with an HMA pavement Pro�ect site is located within the vicinity of Evergreen
Park and the Manette Bridge
The Engineer's estimate range for this pro�ect is between $1 2M and $1 4M
PREVIEWING CONTRACT DOCUMENTS Contract Documents may be previewed at the
1 ARC Document Solutions website (www e-arc com) Go to http //www e-arc com/wa/tacoma,
then click on the link "Enter Public Planroom " Scroll down or search to find the pro�ect
'
'
,
�
'
'
PURCHASING CONTRACT DOCUMENTS The Contract Documents may be ordered and
purchased from ARC Document Solutions Payment is typically cost of reproduction (non-
refundable) Contact Bid Services at ARC m Tacoma, WA 1(800) 337-8103, FAX (253) 272-4064,
E-mad tacoma bidservices@e-arc com
PROPOSALS All bid proposals must be made on the blank forms furnished in the Contract
Documents Sealed envelopes contaming bids shall be entitled Washington Avenue Sewer
Improvements
BID SECURITY Each bid proposal shall be accompanied by a bid proposal deposit in cash,
certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the
amount of such bid proposal The fadure to furnish a bid deposit of a minimum of 5 percent shall
make the bid nonresponsive and shall cause the bid to be re�ected by the Contracting Agency
PERFORMANCE BOND: The successful bidder will also be required to provide a PerFormance
Bond for 100 percent of the Contract Price Should the successful bidder fad to enter into such
contract and furnish satisfactory performance bond within the time stated in the specifications,
the bid proposal deposit shall be forFeited to the City of Bremerton
' C�ry of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
I-1
236-1896-113 (Ol/04)
November 2013
Not�ce Invmng Bids
LJ
PRE-BID CONFERENCE: A pre-bid conference will be conducted by the City, which will
include a walk-through of the pro�ect site The ob�ective of the pre-bid conference is to acquaint
prospective bidders with the work and the conditions of the site The pre-bid conference is
scheduled for NOVEMBER 20 20�3, at 10 00 a m at the City of Bremerton Engineering offices
The address is 3027 Olympus Drive, Bremerton, WA 98310 Prospective bidders are highly
encouraged to attend the pre-bid conference
PROJECT COMMUNICATION All communications related to the pro�ect shall be directed to
the City prio� to opening of Bids
Commurncation bv phone/fax/e-mail
Ned Lever, P E
Telephone (360) 473-2398
Fax (360) 473-5398
E-mad ned lever@ci bremerton wa us
Communication by mad
Department of Public Works and Utdities
Engineering Division
3027 Olympus Dnve
Bremerton, WA 98310
ATTN Bdl Davis, P E
CITY'S RIGHTS RESERVED The City of Bremerton reserves the right to re�ect any and all bids
on any or all schedules or alternates or to waive any informalities in the bidding and shall
determme which bid or bidders is the most satisfactory and responsible bidder and shall be the
sole �udge thereof
No plea of mistake in the bid shall be avadable to the bidder for the recovery of his/her deposit
or as a defense to any action based upon the neglect or refusal to execute a contract
The City of Bremerton hereby notifies all bidders that it will affirmatively ensure that in any
contract entered into pursuant to this advertisement, disadvantaged business enterpnses wdl be
afforded full opportunity to submit bids in response to this invitation and will not be discriminated
against on the grounds of race, color, sex, sexual orientation or national origin in consideration
for an award
END OF NOTICE INVITING BIDS
C�ry of Bremerton
Wash�ngton Avenue Sewer lmprovements
Contrac[ Documents
I-2
236-1896-113 (01/04) �
November 2013
Not�ce Inv�ting Bids
'
�
a
'
'
'
'
,
�
�J
�
�
�
'
�
,'
'
'
BIDDER CHECKLIST
This section lists the contract forms required for this pro�ect The bidder's attention is espeaally
directed to the bid forms that must be executed in full as rec�uired and submitted with the bid
BID FORMS
All forms in this section must be executed and submitted to the C�ty with your bid, not later than the
designated bid closing date and time Bids that do not mclude all of the forms, properly completed,
may be declared unresponsive
a Acknowledgement of Bid and Addenda
b Bid Certificate
c Bid Proposal
d Bid Bond
This form to be executed by the b�dder and the surety company unless b�d �s accompan►ed by a
ce�ed check The amount of th�s check or bond shall be not less than 5% (five percent) of the total
amount b►d and may be shown �n dollars or on a percentage bas�s )
e Contractor's Registration
f List of Subcontractors
g Information Required of Bidder
h Non-Collusion Affidavit
i Certification by Proposed Contractor Regarding Equal Employment Opporturnties
� Certification of Non-Segregated Facdities
DOCUMENTS TO BE EXECUTED BY THE SUCCESSFUL BIDDER {
The following forms are to be executed and submitted to the C�ty after the contract is awarded by
the Bremerton City Councd These forms follow the contract forms m Part 1 Unless noted
otherwise, these must be submitted within thirty (30) calendar days after the date of Notice of
Award of Contract
a Contract
b Contractor Certificate
c Performance Bond for 100% of the Contract Amount
d Payment Bond for 100% of the Contract Amount
e Insurance Certificates
DOCUMENTS TO BE EXECUTED PRIOR TO FIRST PAYMENT
a Statement of Intent to Pay Prevading Wages
- Note Cerhfied Payroll shall be submitted weekly to document wages pa�d
' C�ry of eremerton
Washington Avenue Sewer Improvements
Contract Documents
1-3
236-7896-113 (Ol/04)
Novembe� 2013
8►dder Checkhst
0
t
DOCUMENTS TO BE EXECUTED PRIOR TO FINAL PAYMENT AND RELEASE OF
RETAINAGE
a Acceptance of Compensation and Release of All Claims (See Appendix D)
b Affidavit of Wages Paid
1 <
`c�
]�
4
^t
C�ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements I-4 November 2013
Contract Documents 8►dder Checkl�st
'
C I
LJ
' BID TO
3 This Bid wdl remain open for the period stated in the "Notice Inviting Bids" unless
otherwise required by law Bidder wdl enter into a CONTRACT within the time and in
the manner required m the "Notice Invitmg Bids" and the "Instructions to Bidders," and
wdl furrnsh the insurance certificates, Payment Bond, and Performance Bond required
by the Contract Documents
4 Bidder has examined copies of all the Contract Documents including the following
addenda (receipt of all of which is hereby acknowledged)
1 The undersigned Bidder proposes and agrees, d this Bid is accepted, to enter into an
' CONTRACT with the OWNER in the form included in the Contract Documents to
perform the WORK as spec�fied or indicated in said Contract Documents entrtled
"WASHINGTON AVENUE SEWER IMPROVEMENTS "
, 2 Bidder accepts all of the terms and conditions of the Contract Documents, including
w�thout limitation those in the Notice Inviting Bids and Instruction to Bidders, dealing
with the disposition of Bid Secunty
'
�
'
,
Number
'
'
'
'
�
BID FORMS
ACKNOWLEDGMENT OF BID AND ADDENDA
CITY OF BREMERTON (WASHINGTON)
PUBLIC WORKSAND UTILITIES ENGINEERING DIVISION
Fadure to acknowledge addenda shall render the bid non-responsive and shall be
cause for its re�ection
5 Bidder has famdianzed itself with the nature and e�ctent of the Contract Documents,
WORK, site, locality where the WORK is to be performed, the legal requirements
(federal, state and local laws, ordmances, rules, and regulations), and the conditions
affecting cost, progress or performance of the WORK and has made such independent
investigations as Bidder deems necessary
To all the foregoing, and mcluding all Bid Forms contained m this Bid, said Bidder further
agrees to complete the WORK required under the Contract Documents withm the
Contract Time stipulated in said Contract Documents, and to accept in full payment
therefore the Contract Price based on the Total Bid Price(s) named in the
aforementioned Bid Forms
, Dated
Bidder
, By
(Signature and Title)
' C�ty of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
Date
BF-1
236-1896-113(O1/04)
November 2013
Acknowledgment of Bid and Addenda
�1
�
�
1
THIS PAGE LEFT INTENTIONALLY BLAN6(
'
'
'
�
�
�
�
�
�
�
C'
J
'
L_ J
C�ry of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
BF-2
236-1896-113(O1/04) �
November 2013
Acknowledgment of Bid and Addenda
'
�
,
'
'
'
,
'
,
'
'
,
,
�
'
'
'
,
'
1
BID CERTIFICATE
(if Corporation)
STATE OF
COUNTY OF
)
) SS
)
i HEREBY CERTIFY that a meeting of the Board of Directors of the
a corporation existing under the laws of the State of , held on
, 2013, the following resolution was duly passed and adopted
"RESOLVED, that , as
President of the Corporation, be and is hereby authorized
to execute the Bid dated , 2013, to the City of Bremerton by this
corporation and that his execution thereof, attested by the Secretary of the
Corporation, and with the Corporate Seal affixed, shall be the official act and deed
of this Corporation "
I further certify that said resolution is now in full force and effect
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the
corporation this , day of 2013
Secretary
(SEAL)
C�ry of eremerton
Washmgton Avenue Sewer Improvements
Contract Documents
BF-3
236-1896-113 (O7/04)
November 2013
B�d Cert�cate (�f Corporanon)
THIS PAGE LEFT INTENTIONALLY BLANK
C�ry of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements BF-4 November 2013
Contract Documents B�d Cert�ficate (�f Corporat�on)
�
,
�
'
'
'
'
,
1
'
,
,
'
�
,
'
,
'
'
BID CERTIFICATE
(if Partnership)
STATE OF
COUNTY OF
)
) SS
)
I HEREBY CERTIFY that a meeting of the Partners of the
a partnership existing under the laws of the State of , held on
, 2013, the following resolution was duly passed and adopted
"RESOLVED, that , as
of the Partnership, be and is hereby authorized
to execute the Bid dated , 2013, to the City of Bremerton by
this partnership and that his/her execution thereof, attested by the
shall be the official act and deed of
this Partnership "
I further certify that said resolution is now in full force and effect
IN WITNESS WHEREOF, I have hereunto set my hand this , day
of , 2013
Partner
(SEAL)
Ciry of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
BF-5
236-1896-113 (01/04)
November 2013
Bid Cert�cate (if Partnersh�p)
THIS PAGE LEFT INTENTIONALLY BLANK
C�ty of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer Improvements BF-6 - November 2013
Contract Documents Bid Cert�cate (�f Partnersh►p)
'
❑
'
STATE OF
� COUNTY OF
'
'
'
�
'
'
�
'
'�
�
�
�
�
)
) SS
)
BID CERTIFICATE
(if Joint Venture)
i HEREBY CERTIFY that a meeting of the Prmcipals of the
a Joint venture existing under the laws of the State of , held on
, 2013, the followmg resolution was duly passed and adopted
"RESOLVED, that , as
of the Jomt Venture,
be and is hereby authorized to execute the Bid dated �
2013, to the City of Bremerton by this �omt venture and that his/her execution thereof,
attested by the shall be the oTficial act and deed of this
Joint Venture "
I further certify that said resolution is now in full force and effect
IN WITNESS WHEREOF, I have hereunto set my hand this , day
'of , 2013
(S EAL)
' C�ty of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
Managing Partner
BF-7
236-1896-113(O1/04)
November 2013
B�d Cert�cate (if Joir►t Venture)
,
THIS PAGE LEFT INTENTIONALLY BLANK
C�ty of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer Improvements BF-8 November 2013
Contract Documents Bid Certficate (if Jo�rn Venture)
�
C
�
�
'
,
,
�
�'
�
�
,
'
,
�
1
��
�
STATE OF
COUNTY OF
BID CERTIFICATE
(if Limited Liability Company)
)
) SS
)
I HEREBY CERTIFY that a meeting of the Members of the
a limited liabdity company existing under the laws of the State of , held on
, 2013, the following resolution was duly passed and adopted
"RESOLVED, that and
as members of the Limited Liabdity Company, be and are hereby authorized to
execute the CONTRACT dated , 2013, to the
City of Bremerton by this limited liability company and that their execution thereof
shall be the official act and deed of this Limited Liabdity Company "
I further certify that said resolution is now in full force and effect
IN WITNESS WHEREOF, I have hereunto set my hand this , day
of , 2013
(SEAL)
' C�ry of Bremerton
Wash�ngton Avenue Sewer Improvements
Con[ract Documents
A Limited Liability Company
By
Member
By
Member
236-1896-113 (01/04)
BF-9 November 2013
B�d Cert�ficate (�f Limrted Liabd�ty Company)
��
THIS PAGE LEFT INTENTIONALLY BLANK
City of Bremerton 236-1896-713 (Ol/04)
Wash�ngton Avenue Sewe� lmprovements BF-10 November 2013
Contract Documents B�d Cert�ficate (�f Limrted L�ab�liry Company)
�
�
�
'
'
�J
,
,
�
1
�
'
Cl
�
C�
'
'
BID PROPOSAL
BASE BID (SCHEDULES A, B, AND C)
November 2013
The following proposal has both lump sum and urnt price bid items In the final column of each
schedule, write out the pnce in dollars and cents using numerals
Sales Tax — The Bidder shall include sales tax in the Bid Item price per Section 1-07 2(1) —
State Sales Tax Rule 171 for all items in Schedule A
Item Estimated Total
No. Section Descri tion Quantit Unit Price Amount
SCHEDULE A — ROADWAY IMPROVEMENTS
A-1 1-04 Mmor Chan es and Force Account EST $40,000 $40,000
A-2 1-09 Mobdization LS $ $
A-3 SP 1-10 Pro ect Tem ora Traffic Control LS $ $
A-4 SP 2-02 Removal of Structures and LS $ $
Obstructions
A-5 SP 2-02 Pothole Exist�n Utili 10 EA $ $
A-6 SP 2-02 As halt Conc Pavement Removal 2,629 SY $ $
A-7 SP 2-02 Cement Conc Pavement Removal 232 SY $ $
A-8 SP 2-02 Cement Conc Sidewalk and $ $
Drivewa Removal 547 SY
A-9 SP 2-02 Cement Conc Curb and Gutter 1,686 LF $ $
Removal
A-10 SP 2-02 Remove/Abandon Storm S stem LS $ $
A-11 SP 2-02 Ad ust Existm Utdit to Grade 5 EA $ $
A-12 2-03 Roadwa Excavation Incl Haul 876 CY $ $
A-13 SP 2-09 Shorin or Extra Excavation Class B LS $ $
A-14 SP 2-09 Contaminated Material Excavation 750 TN $ $
Incl Haul
A-15 SP 2-12 Geo rid Reinforcement 2,813 SY $ $
A-16 SP 4-04 Crushed SurFacm To Course 1 467 TN $ $
A-17 SP 5-04 Cold Mix 70 TN $ $
A-18 SP 5-04 HMA CI 1/2 In PG 64-22 542 TN $ $
A-19 5-05 Cement Conc Pavement 21 CY $ �
A-20 SP 7-04 Solid Wall PVC Storm Sewer Pipe, 18 LF $ �
61n Diam
' C�ty of Bremerton 236-1896-113 (O7/04)
Washmgton Avenue Sewer Improvements BF-11 November 2013
Contract Documents Bid Proposal
'
Item Est�mated Total
iVo Section Descri tion Quant�t Unit Price Amount
A-21 SP 7-04 Solid Wall PVC Storm Sewer Pipe, 383 LF $ $
81n Diam
A-22 SP 7-05 Catch Basin, T e 1 13 EA $ $
A-23 SP 7-08 CDF Backfdl 10 CY $ $
A-24 SP 8-01 Erosion/Water Pollution Control LS $ $
A-25 SP 8-02 Landsca e Re air LS $ $
A-26 SP 8-04 Cement Conc Curb and Gutter 856 LF $ $
T eA
A-27 SP 8-04 Cement Conc Curb T e C1 830 LF $ $
A-28 SP 8-06 Cement Conc Dnveway Approach, 17 SY $ $
T e III
A-29 SP 8-13 Surve Monument 8 EA $ $
A-30 8-14 Cement Conc Sidewalk 473 SY $ $
A-31 8-14 Cement Conc Curb Ramp Type 3 EA $ $
Per endicular
A-32 8-14 Cement Conc Curb Ramp Type 3 EA $ $
Parallel
A-33 8-14 Cement Conc Curb Ramp Type 3 EA $ $
Combination
A-34 SP 8-22 Pavement Markm LS $ $
TOTAL SCHEDULE A (Items A1—A34 $
C�ty of Bremerton 236-1896-113 (01/04) �
Wash�ngton Avenue Sewer Improvements BF-12 November 2013
Contract Documents B�d Proposal
'
�
�
�
�
�
��
�
�
�
'
�
�
'
'
,
�l
�
Sales Tax — The Bidder shall not include sales tax in the individual bid Item prices of
Schedules B and C, but as a total for all items under each Schedule, per Section 1-07 2(2) —
State Sales Tax Rule 170
Item Estimated Urnt Total
No. Sect�on Descri tion Quant�t Price Amount
SCHEDULE B - SANITARY SEWER
B_1 1-04 4 Minor Changes and Force Account EST $50,000 $50,000
B_2 1-09 Mobdization LS $ �
B_3 SP 1-10 Pro�ect Temporary Traffic Control LS $ $
B_4 SP 2-02 Removal of Structures and Obstructions LS $ $
B_5 SP 2-02 Cement Conc Pavement Removal 331 SY $ $
B_6 SP 2-02 Cement Conc Sidewalk and Driveway $ $
Removal 240 SY
B_7 SP 2-02 Remove/Abandon Sewer System LS $ $
g_g SP 2-02 Pothole Existing Utdity 10 EA $ $
B_9 SP 2-09 Shoring or Extra Excavation Class B LS $ $
B-10 SP 5-04 Cold Mix 70 TN $ $
B-11 5-05 Cement Conc Pavement 102 CY $ $
B_12 SP 7-05 Manhole 24 In Diam , Shallow 7 EA $ $
8-13 SP 7-05 Manhole 48 In Diam , Type 2 8 EA $ $ -
B-14 SP 7-05 Sanitary Sewer Manhole Lin�ng 2 EA � $ -
B-15 SP 7-08 Unsuitable Pipe Foundation Excavation 20 CY $ $
Incl Haul �
B-16 SP-7-08 CDF Backfdl 10 CY $ $
B_17 SP 7-17 PVC Sarntary Sewer Pipe 8 In Diam 286 LF $ $
B_18 SP 7-17 C900 PVC Sanitary Sewer Pipe 23 LF $ $
61n Diam
B_19 SP 7-17 C900 PVC Sanitary Sewer Pipe 133 LF $ $
81n Diam
B_20 SP 7-17 PE Sewer Pipe 8 In Diam 90 LF
B_21 SP 7-17 PE Sewer Pipe 10 In Diam 759 LF
B_22 SP 7-17 PE LPS Main 4 In Diam 775 LF $ $
B_23 SP 7-17 2 In Blow-off Assembly 2 EA $ $
B_24 SP 7-17 1 In Air and Vacuum Release Valve 1 EA $ $
Assem bl
' City of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer Improvements BF-13 November 2013
Contract Documents B�d Proposal
I
J
Item Estimated Urnt Total
No. Section Descri tion Quantit Price Amount
8-25 SP 7-17 Slip-Lining 4 In Diam 714 LF $ $
B-26 SP 7-18 PVC Sanitary Sewer Lateral Pipe 161 LF $ $
41n Diam
B-27 SP 7-18 PVC Sanitary Sewer Lateral Pipe 33 LF $ $
61n Diam
8-28 SP 7-18 PE Sarntary Sewer Lateral Pipe 6 In Diam 37 LF � �
8-29 SP 7-18 PE LPS Lateral 1-1/4 In Diam 784 LF $ $
B-30 SP 7-18 Single LPS Lateral Service Connect�on $ $
1-1/4 In Diam 14 EA �,
�
B-31 SP 7-19 LPS Mam End-of-Run Cleanout 1 EA $ ', $
41n Diam
B-32 SP 7-19 PVC Gravity Main Sewer Cleanout 2 EA $ ', $
81n Diam
B-33 SP 7-22 Simplex Gnnder Pump Assembly, 11 EA $ $
Com lete
B-34 SP 7-22 Duplex Grinder Pump Assembly, 3 EA $ ,$
Com lete
B-35 SP 7-22 Electrical Panel Upgrade FA $25,000 $25,000
B-36 SP 8-01 Erosion/Water Pollution Control LS $ �$
B-37 8-14 Cement Conc Sidewalk 240 SY $ $
B-38 SP 8-02 Landscape Repair LS $ $
TOTAL SCHEDULE B Items B1-B38 $
Sales Tax 8 6%
Schedule B Total
C�ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements BF-14 November 2013
Contract Documents Bid Proposal
'
�
'
,
'
,
'
,
,
,�
�
'
'
II
,
'
1
Estimated Un�t Total
Item No Section Descri tion Quantit Price Amount
SCHEDULE C — WATER
C-1 1-04 4 Minor Changes and Force Account EST $40,000 $40,000
C-2 1-09 Mobdization LS $ $
C-3 SP 1-10 Pro�ect Temporary Traffic Control LS $ $
C-4 SP 2-02 Cement Conc Pavement Removal 1,387 SY $ $
C-5 SP 2-02 Cement Conc Sidewalk and Driveway 221 SY $ $
Removal
C-6 SP 2-02 Cement Conc Curb and Gutter Removal 194 LF $ $
�-7 SP 2-02 Remove/Abandon Water System LS $ $
�-g SP 2-02 Pothole Existmg Utdity 10 EA $ $
�-9 SP 2-09 Shonng or Extra Excavation Class B LS $ $
C-10 SP 5-04 Cold Mix 158 TN $ $
C-11 5-05 Cement Conc Pavement 231 CY $ $
C-12 SP 7-08 Unsudable Pipe Foundat�on Excavat�on 20 CY $ $
Incl Haul
C-13 SP 7-08 CDF Backfdl 10 CY $ $
C-14 7-09 D I Pipe (Restra�ned Joint) for 14 LF $ $
Water Mam 3 In Diam
C-15 7-09 D I Pipe (Restrained Joint) for 11 LF $ $
Water Main 4 In Diam
C-16 7-09 D I Pipe (Restrained Jomt) for 61 LF $ $
Water Main 6 In Diam
C-17 7-09 D I Pipe (Restrained Joint) for 2,455 LF $ $
Water Main 8 In D�am
C-18 SP 7-12 Gate Valve 4 In 1 EA $ $
C-19 SP 7-12 Gate Valve 6 In 5 EA $ $
C-20 SP 7-12 Gate Valve 8 In 23 EA $ $
C-21 SP 7-14 Hydrant Assembly 4 EA $ $
C_22 SP 7-15 Single Service Connection 1 In Diam 28 EA $ $
C-23 SP 7-15 Single Service Connection 2 In Diam 1 EA $ $
C-24 SP 8-01 Erosion/Water Pollution Control LS $ $
C-25 8-14 Cement Conc Sidewalk 205 SY $ $
' C�ry of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer Improvements BF-15 November 2013
Contract Documents Bid Proposal
CI
Estimated Urnt Total
Item No Section Descri tion Quantit Price Amount
C-26 SP 8-04 Cement Conc Curb and Gutter Type A 194 LF $ $
G27 SP 8-06 Cement Conc Driveway Approach, 16 SY $ $
T e III
C-28 8-14 Cement Conc Curb Ramp Type Parallel 7 EA $ $
C-29 8-14 Cement Conc Curb Ramp 2 EA $ $
T e Combination
C-30 8-14 Cement Conc Curb Ramp 1 EA $ $
T e Sin le Direction
TOTAL SCHEDULE C Items C1-C30 $
Sales Tax 8 6%
Schedule C Total
C�ry of Breme►ton
Wash�ngton Avenue Sewer Improvements
Contract Documents
BF-16
236-1896-113 (Ol/04)
November 2013
B�d Proposal
BASE BID PROPOSAL SUMMARY
L I
'
'
KNOW ALL MEN BY THESE PRESENTS,
That
'
'
,
�
,
1
,
1
�
'
held and firmly bound unto City of Bremerton hereinafter called "OWNER," m the sum of
as Principal, and
as Surety, are
dollars,
(not less than 5 percent of the total amount of the Bid)
for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors,
administrators, successors, and assigns, �omtly and severally, firmly by these presents
WHEREAS, said Pnncipal has submitted a Bid to said OWNER to perform the WORK required under the
bidding schedule(s) of the OWNER's Contract Documents entitled WASHINGTON AVENUE SEWER
IMPROVEMENTS.
If the Principal is awarded the Bid and, within 10 calendar days after receipt of the Contract Document
forms from the OWNER, fads to provide the OWNER with the duly executed Agreement, the duly
executed Certificates of Insurance, the duly executed Performance Bond and the duly executed Payment
Bond, all as specified m the Contract Documents, then the Surety shall, without condition and within
calendar days from written demand from the OWNER, pay to the OWNER in U S funds, by certified or
cashiers check, the full amount of this Bid Bond This Bond shall be irrevocable for 90 days after the bid
opening, as defined in the Contract Documents
The Surety stipulates and agrees that the obligation of said Surety shall m no way be impaired or affected
by an extension of the time withm which the OWNER may accept such bid and Surety further waives
notice of any such extension In the event suit is brought upon this bond by said OWNER and OWNER
prevads, said Pnncipal and Surety shall pay all costs incurred by said OWNER m such suit, inciuding
attorney's fees and costs to be fixed by the court
SIGNED AND SEALED, this day of , 20
(SEAL) (SEAL)
(Principal) (Surery)
By By
, (Signature) (Signature)
(SEAL AND NOTARIAL ACKNOWLEDGMENT OF SURETI�
'
�
�. �
Address of Surety to which all notices shall be sent
Address for Service of Process (must be a physical address)
, C�ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
�����:��]►���]
BF-17
236-1896-113 (Ol/04)
November 2013
Bid Bond
'
THIS PAGE LEFT INTENTIONALLY BLANK
�
City of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer Improvements BF-18 November 2013
Contract Documents B�d Bond
'
'
'
n
'
�
'
i�
��
�
'
�
��
�
,
'
L�J
i�
,
CONTRACTOR'S REGISTRATION
Name of Company
Address
UBI #
License/Registration # and Expiration date
License Type
Specialty (if any)
Employe�'s identification number (employer Soc Sec #)
*(not your personal Social Secunty number)
Employment Security Department number
Washington Industrial Insurance number
City of Bremerton Business License number
" If not licensed with the City, a license must be obtained before beginnmg any work
' City of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
BF-19
236-1896-113(01/04)
November 2013
Contractor's Registrahon
,
O
�
,
THIS PAGE LEFT INTENTIONALLY BLANK
�
l�
'J
'
'�
'
❑
�
'
8
��
1
1
1
C�ry of Bremerton
Washington Avenue Sewer Improvements
Contrac[ Documents
BF-20
236-1896-113 (01/04) �
November 2013
Contractor's Registrat�on
1
1
�
'
'
'
��
'
'
1
,
'
'
�
,
'
'
,
'
LIST OF SUBCONTRACTORS
(2 pages)
The Bidder shall provide the following information for each Subcontractor who will perform work or labor
or render service to the CONTRACTOR in or about the construction of the work or improvement, or a
Subcontractor who, under subcontract to the CONTRACTOR, specially fabricates and installs a portion of
the work or improvement accordmg to detaded drawings contained in the plans and specifications, in an
amount in excess of 10 percent of the CONTRACTOR's total bid The Bidder agrees to submit the list of
Subcontractors as part of the Bid or within one-hour of the Bid The CONTRACTOR shall list only one
Subcontractor for each portion of the WORK as is defined by the CONTRACTOR in its bid if no
Subcontractor is listed, the bidder acknowledges that it does not intend to use any subcontractor whose
work on the CONTRACT wdl exceed 10 percent of the bid pnce The Bidder's attention �s directed to the
provisions of Supplementary Condition 6 06 A which stipulates the percent of the WORK to be performed
with the Bidder's own forces Fadure to comply with this requirement will render the Bid non-responsive
and may cause its re�ection Attach additional sheets �f reqwred
In accordance with RCW 39 30 060, the Contractor shall furnish the names of the subcontractors with
whom the bidder, if awarded the contract, wdl subcontract for performance of the work of HVAC (heating,
ventdation, and air conditioning), plumbmg as described m Chapter 18 106 RCW, and electrical as
described in Chapter 19 28 RCW, or to name itself for the work The prime contract bidder shall not list
more than one subcontractor for each category of work identified, unless subcontractors vary with bid
alternates, in which case the pnme contract bidder must indicate which subcontractor wdl be used for
which alternate Failure of the pr�me contract bidder to subm�t as part of the bid, or with�n one hour
after the publ�shed bid subm�ttal time, the names of such subcontractors or to name itself to
perform such work or the naming of two or more subcontractors to perForm the same work shall
render the prime contract bidder's bid nonresponsroe and, therefore, void
NOTE IF THERE IS NO SUBCONTRACT WORK FOR HVAC, ELECTRICAL, OR PLUMBING, THE
CONTRACTOR SHALL NAME ITSELF AS THE SUBCONTRACTOR AND LIST THE �o OF WORK AS
0%.
'
C�ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements BF-21 November 2013
Contract Documen[s L�st of Subcontractors
' z�' � �..�`� �.. , ^ ���� �R � ' ' � � 3, '`u � r � °' %
�� � � ��� � � �� �� �� � �� SUBCONTR�4CT�R #3 � �`-� ,. �� ' � � _� � ��
Com an Name
Subcontractor License #
Work to be erformed PLUMBING
Address
Phone #
Bid Amount and % of Total Bid
� <� z
�'�����3������`���� �,������� � � °?a �� �SUBCONTRACTQR #4 r,A� � �� � ¢�� ���°� �A �€� ��,��'���£;���
� �� � � � � � ��
Com an Name
Subcontractor License #
Work to be erFormed
Address
Phone #
Bid Amount and % of Total Bid
� ��;� m'���� , �= �� _, , . . _ _ _� ,- °� n*,� �,�, �,,�� ��
, y �,� y ,� „� � � _ - � � �,�,� �`���'� �"^ �<� "� s�% .
� � �, �u�� �� �� ����,� �� � � � ,< � A SUBCC?NTRAC,TOR #5 �, �������� � �° �� �� �>�,,'� �
Com an Name
Subcontractor License #
Work to be erFormed
Address
Phone #
Bid Amount and % of Total Bid
a �. ,s " �,,;. i, i ,; � � in, y �m �' . _ _ _ _ � , �, a� �;,.�.""'. _ � «,. � � :� , � - � g ?
-, v � � �#' � `'�' S� �" l � .a � � �' ! � � ��. �.� � � u y � >a?� �,z
� ��`"�y � ��,����=���� � �,� ����SUBCtONTRi4C�TOR�#6<����Y����'� �°%t , ������'� �
Com an iVame
Subcontractor License #
Work to be erFormed
Address
Phone #
Bid Amount and % of Total Bid
� � ���4���.q � r � �� _ ���;��� ������ �=��--F � � ����� �������
,, ,� v � � �� , �v,� �` � � v °�
� .������ @���,° SIJBCONTRACTORw#7� x���M�,�� � �����°'� i �'� � � � » ��
Com an Name
Subcontractor License #
Work to be erformed
Address
Phone #
Bid Amount and % of Total Bid
C�tyofBremerton 236-1896-113(Ol/04) �
Wash�ngton Avenue Sewer Improvements BF-22 November 2013
Contract Documents L►st of Subcontractors
'
'
'
�
(Page 1 of 2)
The Bidder shall furrnsh the following information Additional sheets shall be attached as required
, Fadure to complete these items will cause the Bid to be non-responsive and may cause its
re�ection In any event, no award wdl be made untd all of the Bidder's General Information is
delivered to the CITY
' (1) CONTRACTOR's name and address, including name of primary contact
�
INFORMATION a2EQUIRED OF BIDDER
'
l�J
��
�
(2) CONTRACTOR's telephone number
CONTRACTOR's fax number
(3) CONTRACTOR's license Primary classification
Specialty classifications held, if any
State License No and Expiration Date
Name of Licensee, if different from (1) above
,
'
L �
1
'
'
u
(4) Name, address, and telephone number of surety company and agent who wdl provide the
required bonds on this contract
(5) Name and Position of person(s) who attended the pre-bid visit to the worksite (if any)
, C�ry of Bremerton
Washington Avenue Sewer Improvements
Con[ract Documents
BF-23
236-1896-113 (01/04)
November 2013
Informanon Reqwred of Brdder
'
- INFORMATION 12EQUIRED OF BIDDER
(Page 2 of 2)
(6) ATTACH TO THIS BID a list of 3 pro�ects completed by the Contractor, which are simdar to
the WASHINGTON AVENUE SEWER IMPROVEMENTS pro�ect in nature, value and
complexity of work The 3 pro�ects must have been completed under the bidder's name as
the pnme (general) contractor w�thin the last 10 years The list shall include the following
information as a mirnmum
• Names, address, and telephone number of owner
• Name of pro�ect
• Location of pro�ect
• Bnef description of the work involved
• Contract amount
• Date of completion of contract
• Name, address, and telephone number of architect or engineer
� Name of owner's pro�ect engineer
• List of Ma�or Equipment
• Years m busmess under current name
• Contracts now in hand, gross amount
C�ryof Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer lmprovements BF-24 November 2013
Contract Documents lnformat�on Reqwred of Bidder
'
C
NON-COLLUSION A�FIDAVIT
'
'
STATE OF
COUNTY OF
� , bemg first duly sworn, deposes and says that he or she is
of the party making the foregomg bid that the bid is not made m the interest of, or on behalf of,
any undisclosed person, partnership, company, association, organization, or corporation, that
' the bid is genuine and not collusive or sham, that the bidder has not directly or indirectly
mduced or solicited any other bidder to put in a false or sham bid, and has not directly or
indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a
, sham bid, or that anyone shall refrain from bidding, that the bidder has not in any manner,
directiy or indirectly, sought by agreement, commurncation, or conference with anyone to fix the
bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the
bid pr�ce, or of that of any other bidder, or to secure any advantage against the public body
' awarding the contract of anyone interested in the proposed contract, that all statements
contamed m the bid are true, and further, that the bidder has not, directly or mdirectly, submitted
his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or
' data relative thereto, or paid, and wdl not pay, any fee to any corporation, partnership, company
association, orgarnzation, bid depository, or to any member or agent thereof to effectuate a
collusive or sham bid
'
t
'
Signed
Subscribed and sworn to before me
this day of , 2013
Notary Public m and for the
County of
State of
ss
(SEAL)
City of Bremenon
Wash►ngton Avenue Sewer Improvements
Contract Documents
BF-25
236-1896-113 (01/04)
November 2013
Non-Collusion Affidavrt
THIS PAGE LEFT INTENTIONALLY BLANK
C�ry of Bremenon
236-1896-113 O7/04)
Wash�ngton Avenue Sewer Improvements BF-26 November 2013
Contract Documents Non-Collus�on A�davrt
�
'
'
CERTIFICATION BY PROPOSED CONTRACTOR REGARDING
EQUAL EMPLOYMENT OPPORTUNITY
In accordance with Chapter 56, Laws of 1975 1 st Extraordinary Session, Certification
' regardmg Equal Opportunity is required of bidders or prospective contractors and their
proposed subcontractors pnor to the award of contracts or subcontracts
'
,
L�
,
'
'
1
�
�
'
�
Name of Pnme Contractor
Address
Internal Revenue Service Employer ldent�cation No
a Contra�tor has participated in a previous contract
or subcontract sub�ect to the Equal Opporturnty Clause
b Compliance reports were required to be fded m
connection with such contract/subcontract
c Contractor has filed all compliance reports required by
Executive Orders 10925, 11114, 11246 or by regulations
of the Equal Opporturnty Commission issued pursuant to
Title VII of the Civd Rights Act of 1964
Yes No
Yes No
Yes No,
d if answer to item 'c' is °no", please explam in detail in the space below
CERTIFICATION I, the undersigned, certify that the information above is true and
complete to the best of my knowledge and belief
Name and Title of Signer (please type or print clearly)
' Signature
1
' C�ty of Bremerton
Washrngton Avenue Sewer Improvements
Contract Documents
Date
236-1896-113 (01/04)
gF_27 November 2013
Cert�ficaUOn by Proposed Contractor Regardmg Equal
Employment Opponunrty
CJ
THIS PAGE LEFT IftITENTIONALLY BLAN6C
C►ty of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer Improvements BF-28 November 2013
Contract Documents - Cert�ficanon by Proposed Contractor Regard�ng Equal
Employment Opportunrty
'
'
CERTIFICATION OF NON-SEGREGATED FACILITIES
'
,
,
,
,
'
�
�
�
'
'
'
'
'
'
(Applicable to federally assisted construction contracts and related subcontracts exceeding
$10,000 which are not exempt from the Equal Opportunity clause )
The federally assisted construction contractor certifies that he does not maintam or provide for
his employees any segregated facdities at any of his establishments, and that he does not
permit his employees to perForm their services at any location, under his control, where
segregated facdities are maintained The federally assisted construction contractor certified,
further that he will not maintam or provide for his employees any segregated facdities at any of
his establishments, and that he wdl not permit his employees to perform their services at any
location, under his control, where segregated facilities are maintained The federally assisted
construction contractor agrees that a breach of this cert�fication is a violation of the Equal
Opportunity clause m this contract
As used in this certification, the term "segregated facdities" means any waiting rooms, work
area, rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms
and other storage or dressing areas, parking lots, drmkmg fountains, recreation or entertainment
areas, transportation, and housing facdities provided for employees which are segregated by
explicit directive or area, in fact, segregated on the basis of race, creed, color, or national origin,
because of habit, local custom, or otherwise The federally assisted construction contractor
agrees that (except where he has obtained identical certifications from proposed contractors for
specific time periods) he wdl obtam identical certifications from proposed subcontractors prior to
the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the
Equal Opporturnty clause, and that he will retain such, certification m this fde
Signature
Date
Name and title of signer (piease type)
NOTE THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID
PROPOSAL
, C�ry of Bremerton
Wash�ngton Avenue Sewer Improvemen[s
Contract Documents
END OF BID FORMS
BF-29
236-1896-113 (01/04)
November 2013
Cert�cahon of Non-Segregated Faalrt�es
1
THIS PAGE LEFT INTENTIONALLY BLANK
k
i
C►ty of Bremerton 236-1896-113 (01/04)
Washington Avenue Sewer Improvements BF-30 November 2013
Contract Documents Cert�fication of Non-Segregated Facdmes
'
1
CONTRACT
'
,
ll
'
'
,
(Page 1 of 3)
THIS AGREEMENT is dated the � day of in the year 20 �' by
and between the City of Bremerton (heremafter called CITI� and
called CONTRACTOR)
CITY and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree
as follows
ARTICLE 1. WORK.
CONTRACTOR shall complete the WORK as specified or indicated in the CITY's Contract
Documents ent�tled WASHINGTON AVENUE SEWER IMPROVEMENTS
ARTICLE 2. CONTRACT TIMES.
The WORK shall obtain Substantial Completion for each phase as follows Phase 1 shall be
, obtained by May 1, 2014 Phase 2 shall be obtained w�thin 210 calendar days from the Phase 1
Notice to Proceed date Time is of the essence as to each and every deadline set forth in this
agreement This provision has been specifically negotiated
'
'
'
'
ARTICLE 3. LIQUIDATED DAMAGES.
CITY and the CONTRACTOR recognize that time is of the essence for this Agreement and that
the CITY wdl suffer financial loss �f the WORK is not completed withm the time specified m Article
2 herein, plus any extensions thereof allowed in accordance with Section 1-08 8 of the Standard
Specifications which may be modified by the Special Provisions They also recogrnze the delays,
expense, and d�fficulties involved in proving in a legal proceedmg the actual loss suffered by the
CITY if the WORK is not completed on time Accordingly, instead of requiring any such proof, the
CONTRACTOR shall pay the CITY liquidated damages in the amount of $1,200 per day after the
date of Substantial Completion for each phase
ARTICLE 4. CONTRACT PRICE.
' CITY shall pay CONTRACTOR for completion of the WORK in accordance with the Contract
Documents m the amount set forth in the Bid Proposal, which shall include sales tax as provided
in Section 1-07 2(2) of the Speaal Provisions
' ARTICLE 5. PAYMENT PROCEDURES.
' CONTRACTOR shall submit Applications for Payment in accordance with Section 1-09 9 of the
Standard Specifications which may be modified by the Special Provisions Applications for
Payme ill be processed by ENGINEER as provided m the Special Provisions
' ntractor Imtials
' C�ty of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer Improvements CF-1 November 2013
Contract Documents Contract
1
CONTRACT
(Page 2 of 3)
ARTICLE 6. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between CITY and
CONTRACTOR conceming the WORK consist of this Contract and the followmg attachments to
this Contract , ,
• Notice Invitmg Bids,
• Bidders Checklist,
• Bid Proposal including the Proposal Forms, Information Required of Bidder, Bid Bond,
and all required certificates and affidavits,
• Performance Bond,
• Payment Bond,
• Standard Specifications,
• Amendments to the Standard Specifications,
• Special Provisions,
• Appendices
• Contract Plans,
• Addenda numbers to , inclusive
° Change Orders which may be delivered or issued after Effective Date of the
Agreement and are not attached hereto
There are no Contract Documents other than those listed in this Article 6 The Contract
Documents may only be amended by Change Order as provided in Section 1-04 4 of the
Standard Specifications which may be modified by the Special Provisions
ARTICLE 7. INDEMNIFICATION.
The CONTRACTOR and CITY acknowledge and agree that they have negotiated the following in
accordance with the reqwrements of RCW 4 24 115 and the CONTRACTOR specifically waives
his immunity under- industrial insurance under Title 51 RCW To the fullest extent permitted by
Laws and Regulations, the CONTRACTOR shall indemnify, defend, and hold harmless the CITY,
ENGINEER, their consultants, subconsultants, and the officers, directors, empioyees, and agents
of each and any of them, against and from any and all claims, in�uries, damages, losses or suits,
including all legal costs and attorney fees, all claims and liability arising under, by reason of,
related, or mcidental to the Contract Documents or any performance of the WORK, but not from
the sole negligence or willful misconduct of the CITY and/or the ENGINEER as further defined in
the Contract Documents The provisions of this section shall survive the termination of the
contr t
� C
ntractor Initials
C�ty of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer Improvements CF-Z November 2013
Contract Documents Contract
'
'
�
�
'
i�
�
�
�
,
�--�
l
,
'
CONTRACT
(Page 3 of 3)
ARTICLE 8. ASSIGNMENT
No assignment by a party hereto of any rights under or interests in the Contract Documents will be
bindmg on another party hereto without the wntten consent of the party sought to be bound, and
specifrcaNy but without limitation mornes that may become due and monies that are due may not
be assigned without such consent (except to the extent that the effect of this restriction may be
limited by law), and unless specificaliy stated to the contrary in any written consent to an
assignment, no assignment will release or discharge the assignor from any duty or responsibdity
under the Contract Documents The CITY, in its sole discretion, may refuse to allow the
CONTRACTOR to assign any or all of its duties, rights and/or responsibdities under the
Agreement, except with regards to an assignment of funds for security purposes In the case of an
assignment for secunty purposes the CITY may condition its approval to the extent it deems
necessary to assure that there will be adequate funds to complete the WORK and to pay a
subcontractors and suppliers
CITY and CONTRACTOR each binds rtself, its partners, successors, assigns and legal
representatives to the other party hereto, its partners, successors, assigns and legaf
representatives in respect of all covenants, agreements and obligations contamed m the Contract
Documents
IN WITNESS WHEREOF, CITY and CONTRACTOR have caused this Agreement to be executed
the day and year first above written
CONTRACTOR �_ 0.�e.i-�bt� ����-�o'nT�-
By
[CORPORATE SEAL] `�-��` ��
Attest ���
(��� �er�e.�'`'�
Address for giving notices Address for giving notices
3� l�� �- . �� . �em�� �A�a3�
�
'
,
'
�
Approved as to Form
(Signature)
G t��l
(Title)
C�ty of Bremerton
Washmgton Avenue 5ewer Improvements
Contract Documents
CF-3
. .. - .
i . • . _ . �
� .a � � :
- - • � � . .__ �►�
Agent for service of process
� �.•' �w
236-1896-113 (Ol/04)
November 2013
Contract
�
u
CITY Citv of Bremerton
THIS PAGE LEFT INTENTIONALLY BLANK
�
City of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer Improvements CF-4 November 2013
Cont�act Documents Contract
,
'
�
'
■�J
'
'
,
,
L '
,--,
��
_,
�
�
�J
'
'
STATE OF
COUNTY OF
CONTRACT CERTIFICATE
�if Corporation)
)
) SS
)
I HEREBY CERTIFY that a meeting of the Board of Directors of the
♦ —
• w � -- — �-_---'_�� ----� ---- '� -- =� --
�
a corporation ewsting under the laws of the State of �„ '� �1.. : �a�n� , held on
R� r c�� , 201�; the followmg resolution was duly passed and adopted
`RESOLVED, that �> ycv�� � C�(�'Q- , as
President
of the Corporation, be and is hereby authonzed to execute the CONTRACT dated
2013, by and between this Corporation and City of
Bremerton and that his/her execution thereof, attested by the Secretary of the
Corporation, and with the Corporate Seal affixed, shall be the official act and deed of this
Corporation "
I further certify that said resolution is now in full force and effect
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the
corporation this \Q'� , day ofi�e��c�b� , 2013
(SEAL)
' Ciry of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
�� Secreta ���� �c.,�,�cv��
CF-5
236-1896-113 (Ol/04)
November 2013
Contract Cert�ficate (�f CorporaGOn)
1
THIS PAGE LEFT INTENTIONALLY BLANK
City of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer Improvements CF-6 November 2013
Contract Documents Contract Cert�ficate (�f Corporation)
r
r
�
,
�
'
�
�
�
�
�
�
Bond # SS60407697
PERFORMANCE BOND
(Page 1 of 2)
KNOW ALL MEN BY THESE PRESENTS,
That Pape & Sons Construct�on, Inc as CONTRACTOR,
and RLI Insurance Company es Surety,
are held and firmly bound unto C'�ty of Bremerton hereinafter called "OWNER,° in the sum of
One Mdlion Six Hundred Eiqhty-Two Thousand Nine Hundred Fortv-Three Dollars and 75/ '�
($1 682 943 75) dollars,
for the payment of which sum, well and truly to be made, we bind ourse{ves, ou� heirs, executors,
administrators, succ�ssors, and ass�gns, �oirrtly and severally, firmly by these presents
THE CONDITIONS OF THIS OBLIGATION ARE SUCH, that said CONTRACTOR has been
awarded and is about to enter �rrto the annexed Agreement with said OWNER to perform the
WORK as specfied or indicated in the Contract Documents ent�led "City of Bremerton,
Department of Public Works and Utilities, Bremerton, Washington, WASHINGTON AVENUE
SEWER IMPROVEMENTS", now, therefore, �
'
�
�
�
�
�
� In the event CONTRACTOR fads to bmely or properiy pe�Form any caf the reqwrements of the
Contract DocumeMs at the t�mes and in the manner contained therein, the Surety shall be liable
under tt�is bond up to the amount of the bond for the full amourrt of the OWNERS's expenses to
construct or repair all work as weli as ail loss, cost, expense or damage suffered by the OWNER
� in excess of the Contract amou� due to the CONTRACTOR'S failure to comply with any contract
or perm�t conditions or other applicable laws and regulat�ons
,
�
'�
�
� �
t �
,
'
�
'
�
�
The Surety agrees that within 30 catendar days of receivmg notice that the OWNER has declared
wt
a CONTRACTOR defauit and formally terminated the CONTRACTOR'S nght to complete the
Coritract pursuarrt to �ts terms and conditions and that the CONTRACTOR has defau�ed on all or
part of the terms guaranteed by th�s bond, the Surety shall either
1. Notify the OWNER in wrfing of �ts intent to cure the default itself withm a reasonable
penod of bme acoeptable to the OWNER The OWNER agrees to pay the balance of the
Contract pnce to the Surety m accordance with the terms of the Contract, o�
2 Tender to the OWNER the demanded sum, up to the amount of the bond Hawever, d the
amount necessary for the OWNER to cure the defauft is less than the amount tendered,
the OWNER wdl retum, without inte�est, any overpayment to the Surety
PROVIDED, that any alterations m the WORK to be done or the matenals to be fumished, or
changes �n the t�me of completion, which may be made pursuant to the temns of said Corrtract
Documents, shall not �n any way release said CONTRACTOR or sa�d Surety hereunder, nor shall
any extensions of �me granted under the prov�sions of said Contract Documents, release erther
said CONTRACTOR or sa�d Surety, and notice of such alterations or extensions of the Agreement
�s hereby wanred by said Surety
The obligat�on of the Surety shall mciude reimbursing the City for all costs and expenses,
{including, but not limited to fees and charges of engineers, arch�ects, attomeys, and other
professwnals, and court costs if Ifigation �s commenced) incurred by the OWNER in enforGng the
provis�ons of this Bond
Crty of Bremerton 236-1�6-113 (07/04)
Washrngton Avenue Sewer Improvemer►ts CF-13 November 2013
Contract DocumenLs Per/orn►arxe Bond
� o t
'
'
Bond SSB0407697
PERFORMANCE BOND
(Page 2 of 2)
The CONTRACTOR hereby agr�ees that the CONTRACTOR'S obligation to perForm the r�equired
' work is not limited to the amount of funds held by �e Surety This bond is irrevocable and cannot
be canceled by the Surety or the CONTRACTOR.
'
'
This bond shall remain m full foroe and effect for a penod of one (1) year foltoHnng final
axeptance of the projed by the Cdy, and untd the bond �s released in wnting by the OWNER at
the written request of the Surety or CONTRACTOR.
IN WITNESS WHEREOF, we have hereunder set our hands and seals th�s 2 � day
of December , 2013 .
(SEAL) (SEAL)
PAPE & SONS CONSTRUCTION, INC RLI INSURANCE COMPANY
(C RACT (Su '�
, , � �,
_ �
By: B ' �,
gnature and SEAL) (S�gnature and SEAL) �� `
Cathenne M Fleck, Attomey In Fact
( AND NOTARIAL ACKNOWLEDGEMENT OF SURETI�
�
Address of Surety to which all notices shall be ser�t RLI Insurance Comoanv
3101 Westem Avenue - Swte 300
Seattle, WA 98121
Address of Surety for service of process
(must be a physical address)
RLI Insurance Comoanv
3101 Westem Avenue - Suite 300
Seattle, WA 98121
c►ry or enernerton
Washington Avenue Sewer lmpvnvemerns
Coniract Qocuments
ss
CF-14
236-�895-113 (01/04)
Noviember 2013
Perfarrrwence Borrd
,�
�, _
,-
' �
�� I
'
RLI Surety
P O Box 3967 � Peona, IL 61612-3967
Phone (800)645-2402 � Fax (309)689-2036
www rticorp com
' Know All Men by These Presents
Any and all bonds, underta►�ngs, and recognizances m an amount not to exceed Ten M�Ihon Dollars ($10,000,000) for
any single obhgahon.
' That this Power of Attorney is not valid or m effect unless attached to the bond wluch it authonzes executed, but may be detached by the
approvmg officer if desired
' That RLI Insurance Company, a(n) Illmois corporation, does hereby make, constitute and appomt
�atherine M Fleck. Pamcia A. Fuaua. Ma�rk Ha�ks Brad Ba�non, Kerstuia Zach rczvk �OLntiv and severallv
' m the City of Umversitv Place , State of Waslungton its true and lawful Agent and Attorney m Fact, with full
power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on rts behalf as Surety, the followmg descnbed
bond
'
'
The acknowledgment and execution of such bond by the said Attorney m Fact shall be as bindmg upon this Company as if such bond had
been executed and acknowledged by the regularly elected officers of this Company
1 The RLI Insurance Company further certifies that the followmg is a true and exact copy of the Resolunon adopted by the Board of
Duectors of RLI Insurance Company, and now m force to-wit
'
,
t
1
"All bonds, policies, undertakings, Powers of Attorney or other obligahons of the corporation shall be executed in the corporate
name of the Company by the Pres�dent, Secretary, any Ass�stant Secretary, Treasurer, or any Vice Pres�dent, or by such other
officers as the Board of D�rectors may author�ze. The President, any Vice President, Secretary, any Ass�stant Secretary, or �he
Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertalcings in the
name of the Company. The corporate seal is not necessary for the vaLdity of any bonds, policies, undertakings, Powers of
Attorney or other obligahons of the corporahon. The signature of any such officer and the corporate seal may be printed by
facsimile."
IN WITNESS WHEREOF, the RLI Insurance Company has caused these presents to be executed by its Vice President with its
corporate seal affixed tlus 17th day of 7ulv , 2013
' State of Illmo�s
' County of Peona
�C.
Jacqu me M Bockler Notary Public
"OFFICIAI SEAL"
NOTMY
"'� JACQUELINE M BOCKLER
9TATE OF
���� fAMMISSION EXPIRES 03M8174
On this 17th day of Jul�, 2 13 , before me, a Notary Public,
personally appeared Roy C. D�e , who bemg by me duly sworn,
1 aclmowledged that he s�gned the above Power of Attorney as the aforesaid
officer of the RLI Insurance Company and acknowledged said mstivment
to be the voluntary act and deed of said corporahon
'
'
1
} SS
�
�,a�g: �'y.�
' �pavoqqT� :
: SEAL:
�''�.�� G 1 N 0�5•``��
POWER OF ATTORNEY
RLI Insurance Coropany
RLI Insurance Company
Roy C Die x V�ce Pres�dent
CERTIFICATE
I, the undersigned officer of RLI Insurance Company, a stock
corporahon of the State of Illmo�s, do hereby cerhfy that the attached
Power of Attorney �s m full force and effect and is �rrevocable, and
furthermore, that the Resolut�on of the Company as set forth m the
Power of Attorney, �s now m force In teshmony whereof, I have
here to et my hand and the s 1 of the RLI Insurance Company
th�s U , day of �, Zb/ �
RLI Insurance Company
_...._
Roy C Die V�ce President
4671373020212 A0059411
r
'
'
�,
�
l�
'
�
�
�
�
�
'
�
�
'
'
�
Bond #SSB0407697 �'
PAYMENT BOND
(Page 1 of 2)
KNOW ALL MEN BY THESE PRESENTS,
That Pape & Sons Construction, Inc as CONTRACTOR,
and RLI Insurance Company 8s Surety,
are held and firmly bound urrto City of Bremerton hereinafter called "OWNER,' in the sum of
One Mdlion, Six Hundred Eighty Thousand, Nine Hundred Fo�ty Three Dollars and 751100's ($1,682,943 75) dollars,
for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors,
admin�strators, successors, and assigns, �oiMly and severally, firmly by these preseMs
THE CONDITIONS OF THIS OBLIGATION ARE SUCH, that said CONTRACTOR has been
awarded and is about to enter i�o the annexed CONTRACT with said OWNER to perForm the
WORK as speafied or indicated in the Contract Documents entitied "City of Bremerton,
Department of Pubiic Worlcs and Utilities, Bremerton, Washington,lA�'ASHINGTON AVENUE
SEWER IMPROVEMENTS", now, therefore,
If said CONTRACTOR, or subcor�tractor, fails to pay for any matenals, equipment, or other
supplies, or for rental of same, used in connection with the performar�ce of work contracted to be
done, or for amounts due under appiicable State law for any warlc or labor thereon� said Surety
wnli pay fo� the same in an amount not exceeding the sum s�cified above, and, in the event suit
�s brought upon this bond, reasonable attomey's fees to be fixed by the court This bond shall
inure to the benefit of any persons, companies, or corporat�ons errt�led to file claims under
appl�cable State law so as to groe a nght of act�on to them or their assigns in any swt brought
upon thls bond
PROVIDED, that any alterations in the WORK to be done or the matenals to be fumished, or
changes in the bme of compietion, which may be made pursuant to the terms of said Contract
Documents, shall not m any way release said CONTRACTOR or said Surety thereunder, nor shail
any extensions of fime grarrted under the prowsions of sa�d Contract Documents release e"�ther
said CONTRACTOR or said Surety, and notice of such alterations or extensions of the
CONTRACT is hereby waived by sa�d Surety
The obligat�on of the Surety shall include reimbursing the City of all costs and expenses,
Cncluding, but not limited to fee and charges of engmeers, architects, attomeys, and other
profess�onals, and court costs d Irtigation is commenced) incurred by the OWNER in enforcmg the
prov�sions of this Bond
Crty of Briemerton 236-1896113 (Ol/04}
Washingtar Avenue Sewer Improvements CF-15 November 2013
Contrad Docu/nents Payment Bo►►d
'
L
� •
'
'
'
�
�
�
Bond SS60407697
PAYMENT BOND
(Page 2 of 2)
IN WITNESS WHEREOF, we have hereunder set our hands and seais this 2 � h day
pf December , 2013
PAPE & SONS CONSTRUCTION, INC RLI INSURANCE COMPANY
(C RACTOR) (Surety ,
• '�, � ' _��
By By - -, � - ", :
�, � � � =4
gnature and SEAL) (Signature and SF�1L �, � �._ � "�
Cathenne M Fleck, Attomey In Fact --' ='
, r', '�' ') i ` ' ' `, �' \
( AND NOTARIAL ACIWOWLEDGEMENT OF SURETIO , ,,,> ,�
, �, , l �..
, � ,� ,
'
Address of Surety to which all not�ces shall be sent RL! Insurance Com�y
' 3101 Westem Avenue - Swte 300
Seattle, WA 98121
1
'
Address of Surety for sernoe of process
(must be a phys�cal address)
�
RLI Insurance Company
'
'
,
'
� "
'
'
,'
3101 Westem Avenue - Swte 300
Seattle, WA 98121
END OF CONTRACT FORMS
C!ry � &emerton
Wasiungcon Avefwe Sewer lmprovemerns
Con[raa Documents
s��
t
�
CF-16
236-1896-113 l01/04I
Navember 2013
Paymern 8ond
P �
�
� ' �
��'
'
RLI Surety
P O Box 3967 � Peona, IL 61612-3967
Phone (800)645-2402 � Fax (309)689-2036
www rl�corp com
1 Know All Men by These Presents
Any and all bonds, undertakings, and recognizances m an amount not to exceed Ten Million Dollars ($10,000,000) for
any s�ngle obhgation
' That this Power of Attorney is not valid or m effect unless attached to the bond wluch it authonzes executed, but may be detached by the
approvmg officer if desired
' That RLI Insurance Company, a(n) Illinois corporarion, does hereby make, constitute and appomt
Catherine M Fleck Pamcia A Fu�ua Mark Ha�nks Brad Bannon Ker�rina Zach rczyk� ioLntiv and severallv
' m the City of Uruversitv Place , State of Washin�ton its true and lawful Agent and Attorney m Fact, with full
power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on rts behalf as Surety, the followmg descnbed
bond
'
1
The acknowledgment and execution of such bond by the said Attorney m Fact shall be as bmdmg upon tlus Company as if such bond had
been executed and acknowledged by the regularly elected officers of this Company
' The RLI Insurance Company further certifies that the followmg is a true and exact copy of the Resoluhon adopted by the Board of
Duectors of RLI Insurance Company, and now m force to-wit
'
'
�
�
"All bonds, policies, undertakings, Powers of Attorney or other obLgahons of the corporahon shall be executed in the corporate
name of the Company by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by such other
offcers as the Board of Directors may authorize. The Pres�dent, any V�ce President, Secretary, any Assistant Secretary, or the
Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertalcings in the
name of the Company. The corporate seal is not necessary for the valid�ty of any bonds, pohcies, undertalungs, Powers of
Attorney or ot6er obhgat�ons of the corporation The s�gnature of any such officer and the corporate seal may be printed by
facsimde."
IN WITNESS WHEREOF, the RI.I Insurance Company has caused these presents to be executed by its Vice President wrth its
corporate seal affixed tlus 17th day of Julv , 2013
1 State of Illmo�s
' County of Peona
B.C..
Jacqu me M Bockle Notary Public
��, "OFFICIAL SEAI"
vueuc �ACQUELINE M BOCKLER
sr�re oc
�u�Nas �pMMISSIONEXPIRESaiM&14
On th�s 17th day of July . 2013 before me, a Notary Pubhc,
personally appeared Rov C Die , who being by me duly sworn,
acknowledged that he signed the above Power of Attorney as the aforesaid
officer of the RLI Insurance Company and acknowledged sa�d mstrument
to be the voluntary act and deed of said corporarion
'
'
' f
} SS
)
�.,- -��.�
; �pavoqnTe ;�
—•—
: SEAL:
POWER OF ATTORNEY
RLI Insurance Company
RLI Insurance Company
Roy C D�e x Vice Pres�dent
CERTIFICATE
I, the undersigned officer of RLI Insurance Company, a stock
corporanon of the State of Illmo�s, do hereby cerhfy that the attached
Power of Attorney is m full force and effect and �s trrevocable, and
furthermore, that the Resolut�on of the Company as set forth m the
Power of Attorney, is now m force In testimony whereof, I have
here to $e� my hand n the s al of the RLI Insurance Company
th� '�1 daY o , 7A �3
RLI Insurance Company
,......
Roy C D�e Vice Pres�dent
4671373020212 A0059411
�
�
I�
'
t
'
'
'
'
�
,
l�l
�
1
��
�
1
'
�
�� 9PAPA1- OP ID CF
'`�`° CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDDIYYYI�
12H9/2013
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETVYEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER
IMPORTANT If the cerWicate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed if SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement A statement on this ceR�ficate does not confer rights to the
certificate holder in lieu of such endorsemen s
PROOUCER Np�jE� C8tF1 FI@CIC
Bannon, Carlson & Kessel, Inc PHONE 253-565-3500 �eu�c No 253-565-7209
2121 70th Ave W Ste B
Univers(ty Place, WA 98466-7664 pp cflec bCkinC net
Bradley 8 Bannon
INSURED Pape & Sons Construcdon Inc
Peninsula Equipment Company
Pape & Sons Constructlon Inc
Profit Sharing Plan
9401 54th Ave NW Ste 1A
Gig Harbor, WA 98332
CITYBRE
oregon auto ��reuranee
23933
COVERAGES CERTIFICATE NUMBER REVISION NUMBER
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED NOTWITHSTANDING ANY REQUIREMENT TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS
INSR TypE OF INSURANCE POLICY EFF POUCY E%P ��
L POLICY NUMBER MMIDD D
GENERAL LIABILITY EACH OCCURREI�E $ �,OOO,OO
A X COMMERCIAL GENERAL LIABILITY X C13163066 03/30/2013 03/3012014 p�MISES Ea occurtence $ � 00, ��
cuunes-nnnoe ❑X occuR MED D� (Any one persan) S 5,00
PERSONAL & ADV INJURY $ 1,000,00
X Stop Gap GENERALAGGREGATE $ Z,OOO,OO
GEMLAGGREGATELIMITAPPLIESPER PRODUCTS-COMPlOPAGG $ Z,OOO,OO
Poucv PRO �oc Em Ben $ 1,000,00
auroMOSi�e �u►eiuTV � eB�IN�E�SINGLE LIMIT $ 1,000,00
A X,arrvnuro C13163066 03/30/2013 03/30/2014 BOD�LVIWURY(Perperson) 8
ALLOWNED SCHEDULED BODILYIWURY(Peraa�deM) $
AUTOS AUTOS
HIRED AUTOS ��WNED PROPERTY DAMAGE $
AUTOS PER ACCIDENT
$
UMBRELLA LIAB X pCCUR EACH OCCURRENCE $ S,OOO,OO
q )( exCESS Llae Cvun,ts-MnpE C13163066 03/30/2013 03/30/2014 AGGr�cnTE $ 5,���,�0
DED X RE,ENTION $
WORKERS COMPENSATION X WC STATU- OTH-
AND EMPLOYERS LIABILITY RY L1MIT ER
A ANYPROPRIETOR/PARTNER/EXECUTIVE C1SIC�OB6 OS/SO/2013 OS/SO/2014 ELEACHACCIDENT $ 'I,OOO,OO
OFFICERIMEMBER EXCLUDED? � N � A
(Mandatory In NH) A STOP GAP , E L DISEASE - EA EMPLOYE $
Hyes descnbe under
DESCRIPTION OF OPERATIONS below E L DISEASE - POLICY LIMIT $ 'I,OOO,OO
p InstallaUon Float C13163066 03/30/2013 03/30/2013 Lim�t 50,00
Ded 50
DESCRIPTION OF OPERATIONS f LOCATIONS / VEHICLES (Attach ACORD 101 Addkional Remarks Schedule H more space Is required)
RE Washa.ngton Avenue 3ewer Improvement Pro�ect
Endorsement CG8416 attached
City of Bremerton
Public Works & Utd�ties
Attn Engineenng Diwsion
345 S�xth St
ACORD 25 (2010/OS)
INSURER D
CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS
AUTHORIZED REPRESENTATIVE
���. �
�O 1988-2010 ACORD CORPORATION Ali nghts reserved
The ACORD name and logo are reg�stered marks of ACORD
� ' ,
'
�
L�J
C13-16-30-66
PAPE & SONS CONSTRUCTION
03/30/13
COMMERCIAL GENERAL LIABILITY
CG 841612 03
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
GENERAL LIABILITY MASTER PAK PLUS�
FOR CONSTRUCTION
This endorsemeM modifies insurance provided under the follovinng
COMMERCIAL GENERAL LIABILITY COVERAGE PART
INDEX
�
'
'
�
t
1_J
Subiect
Blanket Adddional Insured (Owners, Lessees or Contradors)
Fire, Lightning, Explosion and Spnnkler Leakage Damage to Premises You Rent
Non-Owned Watercraft
Supplemerrtary Payments (Bad Bonds)
Personal And Advert�sing In�ury - Eledromc Publication Extension
Aggregate Limits (Per Location)
Aggregate Lim�ts (Per Pro�ect)
Voluntary Property Damage Coverage
Off Premises Care, Custody or Control Coverage
, Newly Formed or Aoquired Orgarnzations ,
Dut�es m the Event of OccuRence, Offense, Claim or Sud
Bodily Injury (Mental Anguish)
Waiver of Transfer of R�ghts of Recovery Against Others
Medical Payments
Broad Named Insured
Broadened Mobile Equipment
Incidental Malpradice L�abddy
Non-Owned Aircraft
Property Damage - Elevators
' CG 8416 12 03 Includes copynghted matenal of ISO Proper4es, Inc , with ds rmission
e soo 00 �
Paae
2
3
4
4
5
5
5
6
6
7
7
8
8
8
8
8
8
9
9
Page 1 of 9
C
1. BLANKET ADDITIONAL INSURED (Owners, Lessees Or Contradors)
(Includes a PnmaryMon-Contnbutory prowsion)
Section II - Who Is M Insured is amended to �nclude as an insured any person or organ�zation whom
you are required to name as an adddional insured on th�s policy �n a wntten contrad or wntten
agreement The wntten contract or wntten agreemertt must be currently in effed or becoming effective
dunng the term of this policy and executed pnor to the "boddy in�ury," "property damage" or "personal
and advertising in�ury "
The insurance provided the additional insured �s limited as follows
A. The person or organization is oniy an adddional insured with respect to liabdity
1. Arising out of real property, as descnbed m a wntten contract or wntten agreemeM, that you
own, rent, lease or occupy, or
2. Caused by your ongomg operations pe�formed for the additional insured
The �nsurance provided the add�t�onat insured m 1.A.2 above does not apply to
a. Coverage A- Bodily Injury and Property Damage Liabil�ty, Coverage B- Personal and
Advertising Injury Liability or defense coverage under the Supplementary Payments
ansing out of an architect's, eng�neer's or surveyors rendenng of or fadure to render any
professional services mcludmg
(1) The prepanng, approvmg, or fading to prepare or approve maps, shop drawings,
opi�ions, reports, surveys, field orders, change orders or draHnngs and specifications,
and
(2) Supervisory, inspection, architectural or engineenng adiv�ties
b. " Bodiiy m3ury or "property damage" occumng after
(1) AW work, including materials, parts or equipmeM fumished m connedion with such work,
on the project (other than service, mairrtenance or repairs) that was pe�Fonned by or on
behalf of the adddional insured(s) at the sde where the covered operations have been
completed, or
(2) That portion of "your work" out of which the injury or damage anses has been put to rts
intended use by any person or orgarnzation other than another contractor or
subcontrador engaged in performing operations for a pnncipal as part of the same
pro�ect
B. The limds of msurance applicable to the additional insured are those specified in a wntten contract
or written agreement or the limits of Insurance as stated m the Declarations of this policy and
defined in Section III - Limits Of Insurance of this policy, whichever are less These limits are
mclusrve of and not m addition to the lim�ts of insurance ava�lable under this pol�cy
C. The insu�ance provided the addit�onai msured does not apply to the liability resulting from the sole
negligence of the addrtional insured
CG 8416 12 03 Includes copynghted matertal of ISO Properties, Inc , wrth ds pertnission Page 2 of 8
E 601 00
�'
'
1
�
II�
t
r
1
'
'
L '1
L�J
D. As respeds the coverage provided to the addit�onal insured under this endorsement, Section IV-
Condittons is amended as follows
1. The follovwng is added to Condition 2, Duties In The Event Of Occurnence, Offense. Ciaim,
or Suit
An adddional msured under this endorsement will as soon as pradicable
a. Give wntten not�ce of an "occuirence" or an offense, that may r+esuR �n a claim or "suit"
under this insurance to us,
b. Tender the defense and lndemnity of any claim or "suit" to all insurers whom also have
insurance avadable to the adddional �nsured, and
c. Agree to make avadable any other �nsurance which the addfional msured has for a loss we
cover under this Coverage Part
2. The folloHnng �s added to Condition 3. Legal Action Against Us
We have no duty to defend or indemnify an additional msured under this endorsemerrt untd we
receive wntten notice of a Gaim or "swY from the addiUonal insured
3. The follovinng is added to Paragraph a, Primary Insurance of Condition 4. Other Insurance
If the adddional insured's policy has an Other Insurance provision makmg �ts policy excess, and
a Named Insured has agreed m a wntten contract or wntten agreement to provide the adddional
insured coverage on a pnmary and noncorrtnbutory basis, this poi�cy shall be pnmary and we
wnll not seek confibution from the add�tronal �rtsured's pol�cy for damages we cover
4. The foilowmg is added to Paragraph b, Excess Insurance of Condrtion 4. Other insurance
Except as provided in Paragraph 4.a Pnmary Insurance as amended above, any coverage
provided hereunder shall be excess over any other valid and collectible insurance avadabie to
the additional msured whether primary, excess, conimgent or on any other basis In the event an
additional insured has other coverage avadable for an "occurrence" by virtue mf also being an
additional msured on other policies, this insurance �s excess over those other policies
2. FIRE, LIGHTNING, EXPLOSION AND SPRINKLER LEAKAGE DAMAGE TO PREMISES YOU RENT
If Damage To Premises Rented To You under Coverage A is not otherwise exGuded from this policy,
the follovv�ng applies
A. The last paragraph of 2 Exclusions of Section I- Coverage A is repiaced by the following
If Damage To Premises Rented To You is not othervvise excluded, Exclusions c. through n. do
not apply to damage by fire, lightmng, "explosion" or spnnkier leakage to premises whde rented to
you or temporanly occup�ed by you wrth permission of the owner A separate limrt of insurance
applies to this coverage as descnbed in Section 111- Limits Of Insurance.
B. Paragraph 6. of Section III - Limits Of Insurance is replaced by the follownng
6. Sub�ect to 5. above, the higher of $300,000 or the Damage To Premises Rented To You Limit
shown m the Summary of Limds and Charges section of th�s policy �s the most we vnll pay under
Coverage A for damages because of "property damage" to premises rented to you or
temporanly occupied by you anth the permission of the owner ansing out of any one fire,
lightning, "explosion" or spnnkler leakage mcadent
' CG 8416 12 03
E 802 00
�nc�udes copyngMed matenal of ISO Properties, Inc , wdh its permisswn Page 3 of 9
�
C. Paragraph b.(1)(b) of Condition 4 Other Insurance (Section N— Cond�tions) is replaced by the
folloHnng
(1) That is Fire, Lightrnng, Explosion or Spnnkler Leakage insurance for premises rerrted to you or
temporaniy occupied by you �nnth the permiss�on of the owner,
D. Paragraph 9.a of the definitioa of "msured contrad" m Section V- Definitions is replaced by the
foitowing
9. "Insured contract" means
a. A contrad for the lease of premises However, that portion of the contract for a lease of
premises that indemnifies any person or organizat�on for damages by fire, lightrnng,
"explosion" or sprinkler leakage to premises while rented to you or temporanly occupied by
you with the permission of the owner is not an "insured contrad",
E. The folloHnng defin�tion is added to Section V- Definitions
"Explos�on" means a sudden release of expanding pressure accomparned by a noise, a bursting
forth of mate�ial and evidence of the scattenng of debns to locations further than would have
resutted by grav�ty alone
"Explosion" does not �nclude any of the follov�nng
1. Artificially generated elec:tncal current includmg eledncal arcing that disturbs eledncai devices,
appliances or vnres,
2. Rupture or burst�ng of water pipes,
3. Explosion of steam boders, steam pipes, steam eng�nes or steam turbines owned or leased by
you, or operated under your controt, or
4. Rupture or bursting caused by ce�nfugal force
3. NON-01NNED WATERCRAFT
Subparagraph g(2) of Paragraph 2., Exclusions of Section 1- Coverage A is replaced by the
foilowing
(2) A watercraft you do not own that �s
(a) Less than 51 feet long, and
(b) Not bemg used to carry persons or property fo� a charge,
4. SUPPLEMENT�IRY PAYMENTS
In the Supplementary Payments - Coverages A and 8 provision
The I�m�t for the cost of bad bonds in Paragraph 1.b is changed from $250 to $1000
CG 8416 12 03 Includes copyrighted matena{ of !SO Properties, Inc , with its pertrnssion Page 4 of 9
E 603 00
t
t
'
'
5. PER30NAL AND ADVERTISING INJURY - ELECTRONIC PUBLICATION EXTENSION
Paragraphs 14.b., d. and e. of Section V- Definitions are reptaced by the folloNnng
b. Malicious prosecution or abuse of process,
d. Oral, wntten, televised, v�deotaped or electronic publication of matenal that slanders or libels a
person or organ�zaUon or disparages a person's or organization's goods, produds or services,
e. Oral, wntten, televised, wdeotaped or elec�tronic publication of matenal that violates a person's nght
of pnvacy,
The foilovnng is added to Paragraph 14. "Personal and Ad�ertis�ng In�ury" of Section V- Definitions
h. Discnmination or humdiat�on that results in in�ury to the feelmgs or reputat�on of a natural person,
but only if such discnm�nat�on or humdiatron is
(1 j Not done intentionally by or at the direction of
(a) An insured, or
(b) Any "executive officer" diredor, stockholder, partner or member of the insured, and
�2) Not directly or indirectly related to the employment, prospedive employment or termination of
employment of any person or persons by any insured
Subparagraphs b and c of 2, Exclusions of Section i- Coverage B- Personal Md Advertising
Injury Liability ar�e replaced by the folloHnng
b. Material Published With Knowledge Of Faisity
"Personal and advertising in�ury" ansmg out of orai, wntten, televised, videotaped or eledronic
publication of matenal, if done by or at the direct�on of the lnsured vinth knowledge of �ts fals�ty,
c. Material Published P�ior To Policy Period
"Personal and advertismg in�ury" ansing out of oral, wntte�, telewsed, v�deotaped or eledronic
publication of materiai whose first publication�took place before the beginnmg of the policy penod,
6. At3GREGATE LIMITS OF INSURANCE (PER LOCATION)
The General Aggregate Limit under Section III Limits Of Insurance applies separately to each of your
"locations" owned by or rented to you or temporanly occupied by you with the permission of the owner
"Location" means premises involvmg the same or connecting lots, or premises whose connection �s
interrupted only by a street, roadway, waterway or nght-of-way of a radroad
7. AGGREGATE LIMITS OF INSURANCE (PER PROJECT)
The General Aggregate Limit under Section 111 Limits Of Insurance applies separately to each of your
projects away from premises owned by or rented to you
' CG 8416 12 03
E 604 00
Includes copynghted matenal of ISO Properhes, Inc , w�th Rs permiss�on Page 5 of 9
.'
�
8. VOLUNTARY PROPERTY DAMAGE COVERAGE
At your request, we Nnll pay for "loss" to property of others caused by your business operations The
most we wnll pay for this coverage is $500 each "occuRence " The "loss" must occur during the policy
penod The "occunence" must take place in the "coverage temtory".
"Loss" means unintended damage or destrudion "Loss" does not mean disappearance, abstraction or
theft
This coverage does not apply to•
1. Damage ansing out of the use of any "auto",
2. Property you own, occupy, rent or lease from others, or
3. Property on your premises for sale, service, repair or storage
None of the other policy exclusions apply to this coverage
If the policy to which this endorsement is attached is wntten vinth a property damage liabdity dedudible,
the deductibie shali apply to Voluntary Property Damage The lim�t of coverage stated above shall not
be reduced by the amount of this dedudible
9. OFF PREMISES CARE, CUSTODY OR CONTROL COVERAGE
A. We vwll pay those sums that you become legally obligated to pay as damages because of "property
damage" to personal prope�ty of others whde in your or your "employees" care, custody or control or
real property of others over which you or your "employees" are exerc�sing physical control if the
"property damage" anses out of your business operations This Coverage is sub�ect to sections B.,
C., D and E. below
B. Exclusions
This insurance shall not apply to
1. "Property damage" of property at premises owned, rented,+leased, operated or used by you,
2. "Property damage" of property whde in trans�t, �
3. The cost of repainng or replaci�g
f
(a) Any of your work defectrvely or incorrectly done by you or by others on your behalf, or
(b) Any product manufactured, sold or supplied by you, unless the "property damage" is caused
diredly by you after delivery of the produd or completion of the woric and resutting from a
subsequent undertaking, or
4. "Property damage" of property caused by or ansing out of the "products-completed
operations hazard"
C. Limits Of Insurance - The most we nnll pay for "property damage" under this Section 9 is $25,000
for each "occurrence" The most we �nnll pay for the sum of all damages covered under this Section
9 because of "property damage" is an annual aggregate limd of $25,000
The Limits Of insurance provided under this Section 9 are inclusive of and not in addit�on to any
other limits provided ln the policy or endorsements attached to d
D. Deductible - We �nnll not pay for "propeRy damage" in any one "occurrence" untd the amount of
"property damage" exceeds $250 If the policy to which this endorsement is attached contains a
"property damage" deductible, that deductible shall apply if �t is greater than $250
E. In the eveM of "property damage" covered by th�s endorsement, you shall, if requested by us,
replace the property or furnish the labor and matenais necessary for repairs thereto at your actual
cost, excludmg profit or overhead charges
�
❑
'
�
'
❑
CG 8416 12 03 Indudes copyngMed matenal of ISO Properties, Inc , with ds permission Ps'i e 6 of 9
e �s ao 9
' � r
'
'
u
'
,
10. NEWLY FORMED OR ACQUIRED ORGANIZATIONS
A Paragraph 4 of Section il - Who Is An Insured is deleted and replaced by the folloHnng
4. Any business ent�ty acquired by you or incorporated or orgarnzed by you under the laws of any
individual state of the Unded States of Amenca over which you ma�ntam majority ownership
interest exceeding fifty percent Such aoqwred or newly formed organization Nnll qualify as a
Named Insured �f there is no simila� insurance avadable to that eMity However.
a. Coverage under thls provision applies only urnil ihe expiration of the policy period m which
the entity was acqwred or incorporated or orgarnzed by you
b. Coverage A does not apply to "boddy in�ury" or "property damage" that occurred before the
ent�ty was acquired or incorporated or orgam2ed by you
c. Coverage B does not apply to "personal and adveRising in�ury" ansmg out of an offense
cammitted before the entdy was acqwred or incorporated or organized by you
d. Reconis and descnptions of operations must be mamtained by the first Named Insured
B. This Sedion 10. does not apply to newly formed or acquired orgamzations �f coverage is excluded
either by provisions of the Coverage Part or by other endorsemeM(s) attached to d
11. DUTIES IN THE EVENT OF OCCURRENCE, OFFENSE, CLAIM OR SUIT
A. The reqwremeMs in Section N- Conditions, Paragraph 2.a , that you must see to d that we are
notified of an "occuRence" applies only when the "occurrence" is known to
1 You, �f you are an mdiv�dual,
2. A partner, if you are a partnership,
3. A member or manager, if you are a limited liability company,
4. An executrve officer or designee, if you are a corporation,
5 A trustee, if you are a trust, or
6. A designee, if you are any other type of organizat�on
B. The requirements in Section IV - Conditions Paragraph 2.b that you must see to �t that we recerve
wntten notice of a claim or "swY' �nnll not be considered breached unless the breach occurs after
such cla�m or "swt" �s known to
1. You, if you are an indrvidual,
Z. A partner, if you are a partnership,
3. A member or manager if you are a timited liabdity company,
4. An executive officer or designee, �f you are a corporation,
5. A trustee, if you are a trust, or
6 A designee, if you are any other type of organization
Knowledge of an "occurrence," claim or "suit" by the agent, servant or "employee" of any insured
shall not in itself constitute knowledge of the insured unless an officer or designee shall have
�eceived notice from Rs agent, senrant or "employee"
12. BODILY INJURY '
Paragraph 3. of the definit�on of "bodily 1n�ury" �n the Section V- Definrtions is replaced by the
following
3. "Bodily �n�ury" means bodily in�ury, sickness or disease sustained by a person, including mental
anguish or death resulting from any of these at any time
CG 8416 12 03 Inciudes copyngMed matenal oi ISO Properties, Inc , vnth ds permission Page 7 of 9
E 606 00
13. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS
We have the nght to recover our payments from anyone liable for an in�ury covered by this policy We
will not enforce our nght against any person or organization for whom you pertorm work under a wntten
contract that requires you to obtam this agreement from us
This agreement shall not operate directly or indirectiy to benefd anyone not named in the agreement
14. MEDICAL PAYMENTS
If Coverage C Medical Payments is not otherwise exduded, the Medical Expense limd provided by
this pol�cy shall be the g�eate� of
A. $10,000, or
B. The amount shown in the Declarations
15. BROAD NAMED INSURED
Paragraph 2.a,(1)(d) of Section II - Who Is An Insured is replaced by the follownng
(d) Ansmg out of h�s or her providing or fading to provide professional health care services However,
this exclusion does not apply to nurses, emergency med�cal techniGans or paramedics who are
employed by you to provide med�cal or paramedicai services to your employees
16. BROADENED MOBILE EQUIPMENT
Paragraph 12.f.(1) of Section V- Definitions is replaced by the folloHnng
(1) Eqwpment designed pnmanly for
(a) snow removal,
(b) Road mairrtenance, but not construction or resurtac�ng, or
(c) Street clearnng provided that veh�cles have a Gross Vehicle Weight of 1,000 pounds or greater,
17. INCIDENTAL MALPRACTICE LIABILITY
Paragraph 3. of Section V- Definitions is replaced by the following
3"Bodily m�ury" means boddy in�ury, sickness, disease or "inGdental medical malpractice" sustained
by a person, mcluding mentai anguish or death resultmg from any of these at any time
The follo�nnng �s added to Section V- Definrtions
23. "incidental medical malpractice" means in�ury ansing out of the negligent rendenng or fadure to
render medical or paramed�cal serv�ces to persons by any phys�cian, dentist, nurse, emengency
medical techrnGan or paramedic who is employed by you to provide such services to your
empioyees, prov�ded you are not engaged m the bus�ness or occupation of providmg any
services referred to in th�s definition
78. NON-OWNED AIRCRAFT
The folloHnng is added to Subparagraph g, of 2, Exclusions of Section 1- Coverage A Boddy Injury
And Property Damage Liability:
(6) An aircraft wnth a paid crew, that is hired, chartered or loaned but �s not owned by any msured
CG 8416 12 03 Includes copynghted matenal of ISO Properties, inc , with ds permission Page 8 of 9
E 60T 00
' , .
19.PROPERTY DAMAGE-ELEVATORS
The follov�nng is added to Subparagraph j. of 2,, Exclusions of Section I- Coverage A Bodily Injury
And Property Damage Liability:
Paragraphs (3) and (4) of th�s exclusion do not apply to damages that result from the use of elevators
All other teRns and cond�t�ons of your policy remain unchanged
CG 8416 12 03 Includes copynghted mate�ial of ISO Properties Inc , wdh �ts permission Page 9 Of 9
E 608 00
'
'
,
,
'
'
,
1
�
1
'
�
'
��
�
'
,
STATE OF
COUNTY OF
CONTRACT CERTIFICATE
(if Partnership)
)
) SS
)
I HEREBY CERTIFY that a meeting of the Partners of the
a partnership existing under the laws of the State of , held on
, 2013, the following resolution was duly passed and adopted
"RESOLVED, that , as
of the Partnership,
be and is hereby authorized to execute the CONTRACT dated ,
2013, by and between this Partnership and City of Bremerton and that his/her execution
thereof, attested by the shall be the
official act and deed of this Partnership "
I further certdy that said resolution is now in full force and effect
IN WITNESS WHEREOF, I have hereunto set my hand this , day of ,
2013
(SEAL)
, C�ry of Bremerton
Washington Avenue Sewer Improvements
Contract Documen[s
CF-7
Partner
236-1896-113 (Ol/04)
November 2013
Con[ract Cert�ficate (if Partnership)
'
❑
�
❑
THIS PAGE LEFT INTENTIONALLY BLANK
L_��
�'
�
�
�
�
�
�
�1
�
�
J
�
L�J
City of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
CF-8
236-1896-113 (Ol/04) �
November 2013
Contract Certificate (�f Parinersh�p)
'
,
,
, STATE OF
' COUNTY OF
'
�
'
,
ll
,
�
�
�
,
,
�
�
CONTRACT CERTIFICATE
(if Joint Venture)
)
) SS
)
I HEREBY CERTIFY that a meeting of the Prmcipals of the
a �oint venture existing under the laws of the State of , held on
, 2013, the following resolution was duly passed and adopted
"RESOLVED, that , as
of the Joint Venture,
be and is hereby authorized to execute the CONTRACT dated ,
2013, by and befinreen this Joint Venture and City of Bremerton and that his/her
execution thereof, attested by the shall be the
official act and deed of this Joint Venture "
I further certify that said resolution is now m full force and effect
IN WITNESS WHEREOF, I have hereunto set my hand this , day of ,
2013
(SEAL)
� C�ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
CF-9
Managmg Partner
236-1896-113 (Ol/04)
November 2013
Contract Cert�ficate (�f Joint Venture)
'
❑
'
'
THIS PAGE LEFT INTENTIONALLY BLANK
,
��
�
Ir��
�
��
�
�
�
�
I1
'
,
,
C�ry of Bremerton
Washington Avenue Sewer Improvements
Con[rac[ Documents
CF-10
236-1896-113 (01/04) �
November 2013
Contract Cert�ficate (►f Joint Venture)
'
�
'
'
'
,
'
,
,
�
'
CONTRACT CERTIFICATE
(if limited liability company)
STATE OF )
) SS
COUNTY OF )
I HEREBY CERTIFY that a meeting of the Members of the
a Limited Liabdity Company existmg under the laws of the State of , held on
, 2013, the followmg resolution was duly passed and adopted
"RESOLVED, that , and
as members of the Limited Liability Company,
be and are hereby authorized to execute the CONTRACT dated ,
2013, to the City of Bremerton by this Limited Liabdity Company and that their execution
thereof shall be the official act and deed of this Limited Liabdity Company "
, I further certify that said resolution is now in full force and effect
IN WITNESS WHEREOF, I have hereunto set my hand this , day of ,
1
'
l_J
1
'
'
�
2013
A Limited Liabihty Company
By
Member
BY,
Member
(SEAL)
City of Bremerton -
Washington Avenue Sewer Improvements CF-11
Contract Documents
236-1896-113 (O7/04)
November 2013
CONTRACT CERTIFICATE (�f I�m�ted liabd�ty company)
�
�1
1
�-1
THIS PAGE LEFT INTENTIONALLY BLAN6(
'
'�
�
'
�
'
�
�
�
8
1
1
1
1
C�ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
CF-12
236-1896-113 (Ol/04) �
November 2013
CONTR,4CT CERTIFICATE (if hmrted bab�6ty company)
1
u
,
,
�
'
PERFORMANCE BOND
(Page 1 of 2)
KNOW ALL MEN BY THESE PRESENTS,
That as CONTRACTOR,
and as Surety,
are held and firmly bound unto City of Bremerton hereinafter called "OWNER," in the sum of
' dollars,
for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors,
administrators, successors, and assigns, �omtly and severally, firmly by these presents
�
LJ
THE CONDITIONS OF THIS OBLiGATION ARE SUCH, that said CONTRACTOR has been
awarded and is about to enter into the annexed Agreement with said OWNER to perform the
WORK as specified or indicated in the Contract Documents entitled "City of Bremerton,
Department of Public Works and Utilities, Bremerton, Washington, WASHINGTON AVENUE
SEWER IMPROVEMENTS", now, therefore,
' In the event CONTRACTOR fads to timely or properly perform any of the requirements of the
Contract Documents at the times and in the manner contained therem, the Surety shall be liable
under this bond up to the amount of the bond for the full amount of the OWNERS's expenses to
construct or repair all work as well as all loss, cost, expense or damage suffered by the OWNER
, m excess of the Contract amount due to the CONTRACTOR'S fadure to comply with any contract
or permit conditions or other applicable laws and regulations
'
�
�,
'
�
�
�
�
'
The Surety agrees that withm 30 calendar days of receiving notice that the OWNER has declared
a CONTRACTOR default and formally terminated the CONTRACTOR'S right to complete the
Contract pursuant to its terms and conditions and that the CONTRACTOR has defaulted on all or
part of the terms guaranteed by this bond, the Surety shall either
1 Notify the OWNER in wnting of its intent to cure the default itself within a reasonable
penod of time acceptable to the OWNER The OWNER agrees to pay the balance of the
Contract price to the Surety in accordance with the terms of the Contract, or
2 Tender to the OWNER the demanded sum, up to the amount of the bond However, if the
amount necessary for the OWNER to cure the default is less than the amount tendered,
the OWNER wdl return, without interest, any overpayment to the Surety
PROVIDED, that any alterations m the WORK to be done or the materials to be furnished, or
changes in the time of completion, which may be made pursuant to the terms of said Contract
Documents, shall not in any way release said CONTRACTOR or said Surety hereunder, nor shall
any eutensions of time granted under the provisions of said Contract Documents, release either
said CONTRACTOR or said Surety, and notice of such alterations or extensions of the Agreement
is hereby waived by said Surety
The obligation of the Surety shall include reimbursing the City for all costs and expenses,
, (mcluding, but not limited to fees and charges of engineers, architects, attorneys, and other
professionals, and court costs if litigation is commenced) incurred by the OWNER m enforcing the
provisions of this Bond
� City of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer Improvements CF-13 November 2013
Contract Documents Pe�formance Bond
'
PER�ORMANCE BOND
(Page 2 of 2)
The CONTRACTOR hereby agrees that the CONTRACTOR'S obligation to perform the required
work is not limited to the amount of funds held by the Surety This bond is irrevocable and cannot
be canceled by the Surety or the CONTRACTOR
This bond shall remain in full force and effect for a period of one (1) year following final
acceptance of the pro�ect by the City, and untd the bond is released in wnting by the OWNER at
the wntten request of the Surety or CONTRACTOR
IN WITNESS WHEREOF, we have hereunder set our hands and seals this day
of , 20_
(SEAL)
(CONTRACTOR)
(SEAL)
(Surety)
By By
(Signature and SEAL) (Signature and SEAL)
(SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETI�
Address of Surety to which all notices shall be sent
Address of Surety for service of process
(must be a physical address)
0
City of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer Improvements CF-14 November 2013
Contract Documents Performance Bond
�
�
�
�
'
'
,
�
'
'
�
�
'
�
1
�
�
'
�
PAYMENT BOND
(Page 1 of 2)
KNOW ALL MEN BY THESE PRESENTS,
That as CONTRACTOR,
and as Surety,
are held and firmly bound unto City of Bremerton hereinafter called "OWNER," m the sum of
dollars,
for the payment of which sum, well and truly to be made, we bmd ourselves, our heirs, executors,
admirnstrators, successors, and assigns, �ointly and severally, firmly by these presents
THE CONDITIONS OF THIS OBLIGATION ARE SUCH, that said CONTRACTOR has been
awarded and is about to enter into the annexed CONTRACT with said OWNER to perform the
WORK as specified or indicated in the Contract Documents entitled "City of Bremerton,
Department of Public Works and Utilit�es, Bremerton, Washington, WASHINGTON AVENUE
SEWER IMPROVEMENTS", now, therefore,
If said CONTRACTOR, or subcontractor, fads to pay for any matenals, equipment, or other
supplies, or for rental of same, used in connection with the performance of work contracted to be
done, or for amounts due under applicable State law for any work or labor thereon, said Surety
wdl pay for the same in an amount not exceeding the sum specified above, and, in the event suit
is brought upon this bond, reasonable attorney's fees to be fixed by the court This bond shall
inure to the benefit of any persons, companies, or corporations entitled to file claims under
applicable State law so as to give a nght of action to them or their assigns in any suit brought
upon this bond
PROVIDED, that any alterations in the WORK to be done or the materials to be fumished, or
changes m the time of completion, which may be made pursuant to the terms of said Contract
Documents, shall not m any way release said CONTRACTOR or said Surety thereunder, nor shall
any extensions of time granted under the provisions of said Contract Documents release either
said CONTRACTOR or said Surety, and notice of such alterations or extensions of the
CONTRACT is hereby waived by said Surety
The obligation of the Surety shall include reimbursing the City of all costs and expenses,
(including, but not limited to fee and charges of engineers, architects, attorneys, and other
professionals, and court costs if litigation is commenced) incurred by the OWNER in enforcing the
provisions of this Bond
C►ty of Bremerton 236-1896-113 (Ol/04)
Wash►ngton Avenue Sewer Improvements CF-15 November 2013
Contract Documents Payment Bond
'
PAYMENT BOND
(Page 2 of 2)
IN WITNESS WHEREOF, we have hereunder set our hands and seals this
of , 2013
(CONTRACTOR)
(Surety)
By By
(Signature and SEAL) (Signature and SEAL)
(SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURET'Y)
Address of Surety to which all notices shall be sent
Address of Surety for service of process
(must be a physical address)
END OF CONTRACT FORMS
day
C�ty of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer Improvements CF-16 November 2013
Contract Documents Payment Bond
1
1
0
�
1
PART II
' AMENDMENTS TO THE STANDARD SPECIFICATIONS
1
'
,
'
'
�
�
'
'
'
'
�
'
THIS PAGE LEFT INTENTIONALLY BLANK
�
1
,
INTRODUCTION
The following Amendments and Special Provisions shall be used in con�unction with the 2012
Standard Specifications for Road, Bridge, and Municipal Construction
AMENDMENTS TO THE STANDARD SPECIFICATIONS
The following Amendments to the Standard Specifications are made a part of this contract and
' supersede any conflicting provisions of the Standard Specifications For informational purposes,
the date followmg each Amendment title indicates the implementation date of the Amendment or
the latest date of revision
,
�
�
'
Each Amendment contains all current revisions to the applicable section of the Standard
Specifications and may include references which do not apply to this particular pro�ect
Section 1-01, Definition and Terms
August 5, 2013
1-01.2(2) Items of Work and Units of Measurement
The following abbreviation in this section is deleted
ATB Asphalt Treated Base
1-01.3 Definitions
' The definition for "Bid Documents" is revised to read
The component parts of the proposed Contract which may include, but are not limited to, the
' Proposal Form, the proposed Contract Provisions, the proposed Contract Plans, Addenda,
and, for pro�ects with Contractmg Agency subsurface mvestigations, the Summary of
Geotechnical Conditions and subsurface boring logs (if any)
'
'
'
The definition for "Superstructures" is revised to read
The part of the Structure above
1
�
The bottom of the grout pad for the simple and continuous span bearing, or
The bottom of the block supportmg the girder, or
Arch skewback and construction �oints at the top of vertical abutment members or
ngid frame piers
�3
'
'
,
'
�
Longitudinal limits of the Superstructure extend from end to end of the Structure in accordance
with the following cnteria
1
2
From the face of end diaphragm abuttmg the bridge approach embankment for end
piers without expansion �oints, or
From the end pier expansion �oint for bridges with end pier expansion �oints
Superstructures include, but are not limited to, the bottom slab and webs of box girders, the
bridge deck and diaphragms of all bridges, and the sidewalks when shown on the bridge deck
AMENDMENTS TO THE 2012 STANDARD SPECIFtCATIONS BOOK Page 1
' Revised 8/27/13
The Superstructure also includes th� girders, expansion �omts, bearings, barrier, and railing
attached to the Superstructure when such Superstructure components are not otherwise
covered by separate urnt measured or lump sum bid items
Superstructures do not include endwalls, wingwalls, barner and rading attached to the
wingwalls, and cantdever barriers and radings unless supported by the Superstructure
Section 1-02, Bid Procedures and Conditions
January 2, 2012
1-02.4(2) Subsurface Information
The first finro sentences in the first paragraph are revised to read
If the Contracting Agency has made subsurFace investigation of the site of the proposed work,
the boring log data, sod sample test data, and geotechrncal recommendations reports obtained
by the Contracting Agency will be made avadable for inspection by the Bidders at the location
specified in the Special Provisions The Summary of Geotechnical Conditions, as an appendix
to the Special Provisions, and the boring logs shall be considered as part of the Contract
Sectson 1-03, Award and Execution of Contract
April 2, 2012
1-03.1(1) Tied Bids
This section's title is revised to read
r,
1-03.1(1) Identical Bid Totals
Section 1-05, Control of Work
August 6, 2012
1-05.13(1) Emergency Contact List
The second sentence in the first paragraph is revised to read
The list shall include, at a mirnmum, the Prime Contractor's Pro�ect Manager, or equivalent,
the Prime Contractor's Pro�ect Superintendent, the Erosion and Sediment Control (ESC) Lead
and the Tra�c Control Supervisor
Section 1-06, Control of Material
August 5, 2013
1-06.1(3) Aggregate Source Approval (ASA) Database
The last paragraph is revised to read the following two new paragraphs
Aggregate matenals that are not approved for use in the ASA database may be sampled and
tested by the Agency, for a specified use on a pro�ect, from the source or from a processed
stockpde of the material and all cost for the sampling and testing wdl be deducted from the
Contract
The Contractor agrees to authorize the Pro�ect Engmeer to deduct the sampling and testing
costs from any money due or coming due to the Contractor
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 2
Revised 8/27/13
�
'
'
�
'
'
�
'
,
,
I�
'
I �
i�
��
'
'
�I
1-06.1(4) Fabrication Inspection Expense
The first paragraph is revised to read
In the event the Contractor elects to have items fabricated beyond 300 miles from Seattle,
Washington, the Contracting Agency will deduct from payment due the Contractor costs to
perform fabrication inspection on the following items
• Bndge Bearings (Cylindrical, Disc, Fabric Pad, Pin, Pendulum, Rocker, and
Spherical)
• Cantdever Sign Structures and Sign Bridges
• Epoxy-Coated Reinforcing Steel
• Metal Bridge Rading and Handrad
• Modular Expansion Joints
• Painted Pding and Casing
• Painted and Powder-Coated Luminaire and Signal Poles
• Precast Concrete Catch Basins, Manholes, Inlets, Drywells, and Risers
• Precast Concrete Drain, Perforated Underdrain, Culvert, Storm Sewer, and Sarntary
Sewer Pipe
• Precast Concrete Three Sided Structures
• Precast Concrete Junction Boxes, Pull Boxes, Cable Vaults, Utility Vaults, and Box
Culverts
• Precast Concrete Traffic Barrier
• Precast Concrete Marine Pier Deck Panels
• Precast Concrete Floor Panels
• Precast Concrete Structural Earth Walls, Noise Barrier Walis, and Wall Stem Panels
• Precast Concrete Retaining Walls, includmg Lagging Panels
• Prestressed Concrete Girders and Precast Bridge Components
• Prestressed Concrete Pdes
• Seismic Retrofit Earthquake Restrainers
• Soldier Pdes
• Steel Bridges and Steel Bndge Components
• Steel Column Jackets
• Structural Steel for Ferry Terminals, including items such as Dolphins, Wmgwalls,
and Transfer Spans
• Treated Timber and Lumber 6-inch by 6-inch or larger
• Timber
• Additional items as may be determined by the Engineer
The footnote below the table is revised to read
* An inspection day includes any calendar day or portion of a calendar day spent by one
inspector inspecting, on standby, or traveling to and from a place of fabrication An
additional cost per inspection day wdl be assessed for each additional inspector
Reimbursement will be assessed at $280 00 per day for weekends and holidays for each
on site inspector m travel status, but not engaged in inspection or travel activities when
fabrication activities are not taking place
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 3
, Revised 8/27/13
Section 1-07, Legal Relations and Responsibilities to the Public
April 1, 2013
1-07.1 Laws to be Observed
The following finro sentences are inserted after the first sentence in the third paragraph
In particular the Contractor's attention is drawn to the requirements of WAC 296 800 which
requires employers to provide a safe workplace More specifically WAC 296 800 11025
prohibits alcohol and narcotics from the workplace
1-07.9(2) Posting Notices
This section �s revised to read
Notices and posters shall be placed in areas readdy accessible to read by employees The
Contractor shall ensure the following are posted
1
2
3
4
EEOC - P/E-1 (revised 11/09) - Equal Employment Opportunity is THE LAW
published by US Department of Labor Post for pro�ects with federal-aid funding
FHWA-1022 (revised 11/11) - NOTICE Federal-Aid Pro�ect published by Federal
Highway Administration (FHWA) Post for pro�ects with federal-aid fundmg
WH 1321 (revised 04/09) - Employee Rights under the Davis-Bacon Act published by
US Department of Labor Post for pro�ects with federal-aid fundmg
WHD 1088 (revised 07/09) - Employee Rights under the Fair Labor Standards Act
published by US Department of Labor Post on all pro�ects
5 WHD - 1420 (revised 01/09) - Employee Rights and Responsibdities under The e
Family and Medical Leave Act published by US Department Of Labor Post on all
pro�ects
6
7
8
9
WHD-1462 (revised 01/12) — Employee Polygraph Protection Act published by US
Department of Labor Post on all pro�ects
F416-081-909 (revised 12/12) - Job Safety and Health Law published by Washington
State Department of Labor and Industries Post on all pro�ects
F242-191-909 (revised 12/12) - Notice to Employees published by Washington State
Department of Labor and Industries Post on all pro�ects
F700-074-909 (revised 12/12) - Your Rights as a Worker in Washington State by
Washington State Department of Labor and Industries (L&I) Post on all pro�ects
10 EMS 9874 (revised 04/12) - Unemployment Benefits published by Washington State
Employee Security Department Post on all pro�ects
11 Post one copy of the approved "Statement of Intent to Pay Prevading Wages" for the
Contractor, each Subcontractor, each lower tier subcontractor, and any other firm
(Supplier, Manufacturer, or Fabricator) that falls under the provisions of RCW 39 12
because of the definition of "Contractor" in WAC 296-127-010
12 Post one copy of the prevailmg wage rates for the pro�ect
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 4
Revised 8/27/13
'
,
'
,��
�
1-07.9(5) Required Documents
Item number 2 in the first paragraph is revised to read
2 A copy of an approved "Affidavit of Prevading Wages Paid", State L8�1's form number
F700-007-000 The Contracting Agency wdl not grant Completion untd all approved
Affidavit of Wages paid for Contractor and all Subcontractors have been received by the
Pro�ect Engineer The Contractmg Agency wdl not release to the Contractor any funds
retamed under RCW 60 28 011 untd all of the "Affidavit of Prevading Wages Paid" forms
have been approved by State L&I and a copy of all the approved forms have been
submitted to the Engineer
1-07.14 Responsibility for Damage
The fifth paragraph is revised to read
' Pursuant to RCW 4 24 115, if such claims, suits, or actions result from the concurrent
negligence of (a) the mdemnitee or the mdemnitee's agents or employees and (b) the
Contractor or the Contractor's agent or employees, the indemnity provisions provided in the
' preceding paragraphs of this Section shall be valid and enforceable only to the extent of the
Contractor's negligence or the negligence of its agents and employees
�
'
,
'
1-07.15 Temporary Water PollutionlErosion Control
The third paragraph is deleted
Section 1-08, Prosecution and Progress
April 1, 2013
1-08.1 Subcontracting
In the eighth paragraph, "Contracting Agency" is revised to read "WSDOT"
1-08.3(1) General Requirements
The following new paragraph is inserted after the first paragraph
Total float belongs to the pro�ect and shall not be for the exclusive benefit of any party
'
'
'
�I
'
,
a
1-08.5 Time for Completion
The last paragraph in this section is supplemented with the following
e Copies of the approved "Affidavit of Prevading Wages Paid" for the Contractor and all
Subcontractors
1-08.7 Maintenance During Suspens�on
The second paragraph is revised to read
At no expense to the Contracting Agency, the Contractor shall provide through the
construction area safe, smooth, and unobstructed roadways and pedestrian access routes for
public use during the suspension (as required m Section 1-07 23 or the Special Provisions )
This may include a temporary road, alternative pedestrian access route or detour
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 5
' Revised 8/27/13
Section 1-09, Measurement and Payment
April 1, 2013
1-09.1 Measurement of Quantities
The following new sentence is inserted after the sentence ""Ton" 2,000 pounds of avoirdupois
weight"
Items of payment that have "Lump Sum" or "Force Account" in the Bid Item of Work shall have
no specific unit of ineasurement requirement
1-09.2(5) Measurement
The second sentence m the first paragraph is revised to read
The frequency of verification checks will be such that at least one test weekly is performed for
each scale used m weighing contract items of Work
1-09.6 Force Account
In item No 3. For Equipment, the last sentence in the third sub-paragraph is revised to read
In the event that prior quotations are not obtained and the vendor is a firm mdependent from
the Contractor or Subcontractor, then after-the-fact quotations may be obtained by the
Engmeer from the open market m the vicinity and the lowest such quotation may be used in
place of submitted invoice
Section 3-01, Production From Quarry and Pit Sites
August 5, 2013
3-01.1 Description
In the first paragraph, "asphalt treated base" is deleted
Section 3-04, Acceptance of Aggregate
�►ugust 5, 2013
3-04.3(7)D4 An Entire Lot
The last sentence is deleted
3 Price Adjustments for Qualsty of Aggregate
The calculation m the first paragraph is revised to read
Aggregate Compliance Price Ad�ustment =(Composite Pay Factor — 1 00)
(quantity of material) (unit bid price or Contingent Unit Pnce as shown m Table 1, whichever is
higher ) -
3-04.5 Payment
In the second paragraph, the reference "Section 3-04 3(6)C " is revised to read "Section 3-04 3(8)"
In Table 1, the top finro rows are revised to read the following three new rows
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 6
Revised 8/27/13
C�
'
'
'
�
L
'
In Table 1, the row containing the item "Gravel Borrow for Geosynthetic Retaining Wall" is revised
to read
9 14(4) Gravel Borrow for Structural Earth Walls 4000 2000 $30 $60
The footnotes below the Table 1 are revised to read
1 Based on 1000 CY of Concrete
2 Price ad�ustment only applies to the actual quantity of aggregate used in the concrete
3 Contingent unit price per S Y is $0 30
In Table 2, the first row is revised to read
9-03 1 Concrete Aggregate (all concrete aggregate -including Z 2 2 10 20
pavement)
In Table 2, the row containmg the �tem "Gravel Backfill for Foundations Class A" is revised to read
� 9-03 12(1)A Gravel Backf'�ll for
Foundahons Class A
1
'
�
'
�
�
'
'
,
'
'
In Table 2, the row contairnng the item "Gravel Borrow for Geosynthetic Retaining Wall" is revised
to read
9-03 14 (4) Gravel Borrow for I 2 I 2 I 5 I 5 I 5 I 10
Structural Earth Walls
Item 1 in the footnotes below Table 2 is revised to read
1 For Aggregate, the nominal maximum size sieve is the largest standard sieve opening
listed m the applicable specification upon which more than 1-percent of the material by
weight is permitted to be retained For concrete aggregate, the nominal maximum size
sieve is the smallest standard sieve opening through which the entire amount of
aggregate is permitted to pass
The footnotes below the Table 2 are supplemented with the following
3 Use the pnce ad�ustment factors for the material that is actually used
4 Resistivity 10, pH 10, Chlorides 5, and Sulfates 5
Section 4-06, Asphalt Treated Base
August 5, 2013
This section mcluding title is deleted m its entirety and replaced with the following
Vacant
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 7
Rewsed 8/27/13
Section 5-01, Cement Concrete Pavement Rehabilitat�on
August 5, 2013
5-01.3(2)B Portland Cement Concrete
The fifth sentence in the third paragraph is revised to read
The lower Specification limit for compressive strength shall be 4,000-psi
The last finro sentences in the third paragraph are deleted
5-01.3(4) Replace Portland Cement Concrete Panel
This section is supplemented with the following
Replacement panels that crack shall be repaired as specified in Section 5-05 3(22) at no cost
to the Contracting Agency Epoxy-coated dowel bars meetmg the requirements of Section 9-
07 5(1) may be substituted for the corrosion resistant dowel bars specified
5-01.3(6) Dowel Bar Retro�t
The second sentence in the ninth paragraph is revised to read
The foam msert shall fit tightly around the dowel and to the bottom and edges of the slot and
extend to the top of the existing pavement surface
5-01.3(11) Concrete Slurry
This section including title is revised to read
5-01.3(11) Concrete Slurry and Grinding Residue
All concrete slurry and grmding residue shall be removed from the pavement surface on a
continual basis immediately behind the grindmg or cutting operations Slurry shall not be
allowed to drain into an area open to traffic, off of the paved surface or into any drainage
structure
The Contractor shall collect the concrete slurry and grinding residue from the pavement
surface and dispose of it in accordance with Section 2-03 3(7)C
Openmg to traffic shall meet the requirements of Section 5-05 3(17)
Section 5-02, Bituminous Surface Treatment
August 5, 2013
In this section, "Asphalt Emulsion" is revised to read "Emulsified Asphalt"
5-02.1(1) New Construction
This section is revised to read
This method of treatment requires two applications of emulsified asphalt and three
applications of aggregate The first application of emulsified asphalt is applied to an untreated
Roadway that is followed with an application of aggregate The second application of
emulsified asphalt is followed with finro additional applications of aggregate
AMENDMENTS TO THE 2012 STANDARp SPECIFICATIONS BOOK Page 8
Rewsed 8/27/13
�
,
'
�'
'
,
'
,
5-02.1(2) Seal Coats
This section is revised to read
This method requires the placmg of one application of emulsified asphalt and one or more
sizes of aggregate as specified to an existing pavement to seal and re�uvenate the surface
and to produce a uniform Roadway surface with acceptable nonskid characteristics
5-02.2 Materials
The following new paragraph is inserted after the second paragraph
Each source of aggregate for bituminous surface treatment shall be evaluated separately for
acceptance in accordance with Section 3-04
The second and fourth paragraphs (after implementing the preceding Amendment) are deleted
5-02.3(1) Equipment
The second sentence in the second paragraph is revised to read
A temperature measuring device shall be capable of reporting the temperature of emulsified
asphalt in the tank
5-02.3(2)A New Construction
The fourth and fifth paragraphs are revised to read
Immediately before the first application of emulsified asphalt, the Roadway surface shall be m
, the following condition firm and unyielding, damp, free from irregularities and matenal
segregation, and true to line, grade, and cross-section
1
�
'
�
�
'
'
'
�
'
No traffic will be allowed on the prepared surFace untd the first application of emulsified asphalt
and aggregate has been completed
5-02.3(3) Application of Asphalt and Aggregate
The table "Application Rate" is revised to read
, _ � �__ �= �� e r �3�� '�s�
; - < -
;E ��,� °�' = 3 � - =�_ Y� _ � `ApPlicationWRate ���, ; ` u�� �`° � ��n� a �
� �. r q a � � � � . .r ;� � , � - t "�`�> � a � � z.. � � *� ` 7 � a �
�; =` _ � � _ '�" ��_ � � �' � ��_�� �
; _ �' ' ? � ' �� �Undiluted Emulsified ¢ � ' F ° ��� � � _ �� ��� � ° � �� _ � � , y �_� -,
�x A �
� � ', _ � � :�� , Asphalt � s `�� , � F � � � �� � - � Aggregate _ ' ;� ;
,��� ,, - _
� �� ,� � � �' � - , � � � � (9a per ,sq. ycl.) � ° �x � `� - � � � �°= � � � � ' �Ap,plicatiQn�Rate � � ,
�- � _
; ` `� ° _ z � �
�� � ` �' ` _ `jApplied -� � �;� " �, Aggregate Siie s '(Ibs. per� sq: yd:)�n��
� � �i_
' = �� ? � �� � � "� , _ �� " ` �'��� ���"
� � �- �r� ' �� < - r - � ��� ,� New Construction ��`�� �� - _� � , �� � � �� _ ��-
,� `� �� �_ r ���= ��n =�
First 0 35-0 65 '/2 inch- No 4 25-45
Application or �/ inch-'/Z inch
Appl cat on 0 35-0 60 '/2 inch- No 4 25-40
Choke Stone N/A l No 4- 0 4-6
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 9
' Revised 8/27/13
The table "Pavement Sealing" is deleted
The second paragraph is revised to read
The Pro�ect Engineer wdl determine the application rates The second application of emulsified
asphalt shall be applied the next day, or as approved by the Pro�ect Engmeer
The second to last paragraph is revised to read
Before application of the fog seal, all surFaces shall be thoroughly cleaned of dust, sod,
pavement grindings, and other foreign matter The fog seal emulsified asphalt shall be CSS-1
or CSS-1 h diluted with water at a rate of one part water to one part emulsified asphalt unless
otherwise approved by the Pro�ect Engineer The fog seal shall be uniformly applied to the
pavement at a diluted rate of 0 10 — 0 18 gal/sy The finished application shall be free of
streaks and bare spots
5-02.3(5) Application of Aggregates
The sixth paragraph is revised to read
The Contractor shall apply choke stone to the Roadway with additional spreading equipment
immediately following the irntial rollmg of the coarse aggregate unless otherwise specified in
the Contract documents or spec�fied by the Pro�ect Engineer Excess aggregate shall be
removed from the Roadway A minimum of one pass with a pneumatic roller shall be made
across the entire width of the applied choke stone
5-02.3(7) Patching and Correction of Defects
The last sentence in the last paragraph is revised to read
The CSS-1 or CSS-1 h emulsified asphalt may be diluted with water at a rate of one part water
to one part emulsified asphalt unless otherwise specified by the Pro�ect Engineer
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 10
Revised 8/27/13
'
�
'
LJ
�
5-02.5 Payment
The first sentence in the second paragraph is revised to read
The unit Contract price per mile for "Processmg and Finishing" shall be full pay for all cost to
perform the specified work including, blading, scarifymg, processing, leveling, finishing, and
the manipulation of aggregates as required
The third paragraph is revised to read
"Emulsified Asphalt (�", per ton
The fourth paragraph is revised to read
The unit Contract price per ton for "Emulsified Asphalt (_," shall be full pay for all costs
' to perform the specified Work including furnishing, heating, hauling, and spreading the
emulsified asphalt on the Roadway
1
'
The sixth paragraph is revised to read
The unit Contract price per ton for "Asphalt for Fog Seal" shall be full pay for all costs to
perForm the specified Work for the fog seal
The eighth paragraph is revised to read
' The unit Contract price per cubic yard for "Aggregate from Stockpde for BST" shall be full pay
for all costs to perform the spec�fied Work including loading, transporting, and placmg the
material in the finished Work
' The eleventh paragraph is revised to read
The unit Contract pnce per cubic yard or per ton for "Furnishing and Placmg Crushed
t (� shall be full pay for costs to perform the specified Work including furnishing,
transporting, and placing the matenal in the firnshed Work -'
�
'
,
�
lJ
'
'
The thirteenth paragraph is revised to read
The unit Contract price per hour for "Additional Brooming" shall be full pay for all costs to
perform the specified Work including rebrooming the Roadway
Section 5-04, Hot Mix Asphalt
April 1, 2013
5-04.2 Materials
The following material reference is deleted from this section
Blending Sand 9-03 8(4)
The fourth paragraph is revised to read
The grade of asphalt bmder shall be as required by the Contract Blending of asphalt binder
from different sources is not permitted
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 11
' Revised 8/27/13
5-04.3(7)A1 General
This section is supplemented with the following
The Contractor shall include the brand and type of anti-stripping additive in the mix design
submittal and provide certification from the asphalt binder manufacture that the ant�-stripping
additive is compatible with the crude source and formulation of asphalt binder proposed m mix
design
5-04.3(7)A3 Commercial Evaluation
The second sentence in the second paragraph is deleted
5-04.3(10)B3 Longitudinal Joint Density
The section including title is revised to read
5 Vacant
5-04.3(11)D General
The last sentence in the first paragraph is deleted
5-04.3(12)A Transverse Joints
In the second paragraph "planning" is revised to read "planmg"
5-04.3(20) Anti-Stripping Additive
This section is revised to read
Anti-stripping additive shall be added to the liquid asphalt by the asphalt supplier prior to
shipment to the asphalt mixing plant For HMA accepted by statistical and nonstatistical
evaluation the anti-stripping additive shall be added in the amount designated in the WSDOT
mix design/anti-strip evaluation report provided by the Contractmg Agency For HMA accepted
by commercial evaluation the Pro�ect Engineer will determme the amount of anti-strip to be
added, pavmg shall not begin before the anti-strip requirements have been provided to the
Contractor
5-04.4 Measurement
The first sentence in the first paragraph is revised to read
HMA CI PG , HMA for CI PG _, and Commerc�al HMA wdl be measured
by the ton in accordance with Section 1-09 2, with no deduction being made for the weight of
asphalt binder, mineral fdler, or any other component ofthe mixture
The last paragraph is deleted
5-04.5 Payment
The bid item "Longitudinal Joint Density Pnce Ad�ustmenY', by calculation and paragraph following
bid item are deleted
Section 5-05, Cement Concrete Pavement
August 5, 2013
5-05.3(1) Concrete Mix Design for Paving
The title in the table titled "Portland Cement Concrete Batch Volumes" is revised to read
Portland Cement Concrete Batch Wei hts, er cubic ard of Concrete
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 12
Revised 8/27/13
�
�
'
'
,
,
�
��
,
�
'
�
,
'
'
�
'
�
'
5-05.3(6) Subgrade
The last paragraph in this section is deleted
Section 6-02, Concrete Structures
January 7, 2013
6-02.3(2) Proportioning Materials
The Lean Concrete value m the column "Minimum Cemetitious Content (pounds)" in the table titled
"Cementitious Requirement for Concrete" is revised to read
****145
The followmg new note is inserted after the note """* No maximum specified" in the table titled
"Cementitious Requirement for Concrete"
"***Maximum of 200 pounds
The paragraph following the table "Cementitious Requirements for Concrete" is revised to read
When both ground granulated blast furnace slag and fly ash are included in the concrete mix,
the total weight of both these materials is limited to 40 percent by weight of the total
cementitious material for concrete Class 4000D and 4000A, and 50 percent by weight of the
total cementitious material for all other classes of concrete
6-02.3(2)B Commercial Concrete
The second paragraph is revised to read
Where concrete Class 3000 is specified for items such as,° culvert headwalls, plugging
culverts, concrete pipe collars, pipe anchors, monument cases, Type PPB, PS, I, FB and RM
signal standards, pedestals, cabinet bases, guardrail anchors, fence post footings, sidewalks,
curbs, and gutters, the Contractor may use commercial concrete If commercial concrete is
used for sidewalks, curbs, and gutters, it shall have a minimum cementitious material content
of 564 pounds per cubic yard of concrete, shall be air entrained, and the tolerances of Section
6-02 3(5)C shall apply
6-02.3(2)D Lean Concrete
This section is revised to read
Lean concrete shall meet the cementitious requirements of Section 6-02 3(2) and have a
maximum water/cement ratio of 2
6 Qualification of Concrete Suppliers
The first paragraph is revised to read
Batch Plant Prequalification requires a certification by the National Ready Mix Concrete
Association (NRMCA) Information concerning NRMCA certification may be obtained from the
NRMCA at 900 Sprmg Street, Sdver Sprmgs, MD 20910 or online at www nrmca org The
NRMCA certification shall be valid for a 2-year period from the date of certificate The following
documentation shall be submitted to the Pro�ect Engmeer, a copy of the current NRMCA
Certificate of Conformance, the concrete mix design(s) (WSDOT Form 350-040), along with
copies of the truck list, batch plant scale certification, admixture dispensing certification, and
volumetric water batching devices (including water meters) verification
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 13
' Revised 8/27/13
6-02.3(5)G Sampling and Testing Frequency for Temperature, Consistency, and Air
Control
The last sentence in the second paragraph is revised to read
Samplmg shall be performed in accordance with WSDOT FOP for WAQTC TM 2 and random
samples shall be selected in accordance with WSDOT TM 716
6-02.3(14)C Pigmented Sealer for Concrete Surfaces
This section is revised to read
The Contractor shall submit the pigmented sealer manufacturer's written instructions covering,
at a minimum, the following
Surface preparation
2 Application methods
3 Requirements for concrete curing prior to sealer application � ��
4
5
Temperature, humidity and precipitation limitations for application `
Rate of application and number of coats to apply
The Contractor shall not begm applying pigmented sealer to the surfaces specified to receive
the sealer until receiving the Engineer's approval of the submittal
All surfaces specified in the Plans to receive pigmented sealer shall receive a Class 2 surface
firnsh (except that concrete barrier surFaces shall be finished in accordance with Section 6-
02 3(11)A) The Contractor shall not apply pigmented sealer from a batch greater than 12
months past the initial date of color sample approval of that batch by the Engmeer
The pigmented sealer color or colors for specific concrete surfaces shall be as specified in the
Special Provisions
The final appearance shall be even and uniform without blotchiness, streaking or uneven
color Surface firnshes deemed unacceptable by the Engmeer shall be re-coated in
accordance with the manufacturer's recommendations at no additional expense to the
Contracting Agency
For concrete surFaces such as columns, retaining walls, pier walls, abutments, concrete fascia
panels, and noise barrier wall panels, the pigmented sealer shall extend to 1 foot below the
finish ground line, unless otherwise shown in the Plans
6-02.3(16) Plans for Falsework and Formwork
Item No 4 in the seventh paragraph is revised to read
4 Conditions required by other Sections of 6-02 3(17), Falsework and Formwork
Item's No 5, 6, 7, and 8 in the seventh paragraph are deleted
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 14
Revised 8/27/13
�
�
�J
'
,
The followmg paragraph is mserted after the seventh paragraph
Plan approval can be done by the Pro�ect Engineer for footings and walls 4 to 8 feet high
(excluding pedestal height) provided
Concrete placement rate is 4 feet per hour or less
E
3
Facing is �/-inch plywood with grades as specified per Section 6-02 3(17)I
Studs, with plywood face grain perpendicular, are 2 by 4's spaced at 12 inches
4 Walers with 3,000 pound safe working load ties spaced at 24 inches are finro 2 by 4's
spaced at 24 inches
' 6-02.3(17)F Bracing
In the first paragraph, the phrase "per Section 6-02 3(17)I" is revised to read "in accordance with
Section 6-02 3(17)I"
'
�
,
This section is supplemented with the following new sub-section
6-02.3(17)F5 Temporary Bracmg for Br�dge Girders Durmg Diaphragm and Br�dge Deck
Concrete Placement
Prestressed concrete girders shall be braced to resist forces that would cause rotation or
torsion m the girders caused by the placmg of precast concrete deck panels and concrete for
the bridge deck
Bracing shall be designed and detailed by the Contractor and shall be shown in the
� falsework/formwork plans submitted to the Engineer for approval These braces shall be
furnished, installed, and removed by the Contractor at no additional cost to the Contracting
Agency The Contractor may consider the bracing effects of the diaphragms in developing the
falsework/formwork plans The Contractor shall account for the added load from concrete
� finishing machines and other construction loadings in the design of the bracing
�
,
'
'
Falsework support brackets and braces shall not be welded to structural steel bndge members
or to steel reinforcing bars
6 Temporary Bracing for Bridge Girders
This section including title �s revised to read
6-02.3(17)F4 Temporary Bracing for Bridge Girders During Erection
Steel girders shall be braced in accordance with Section 6-03 3(7)A
Prestressed concrete girders shall be braced sequentially during girder erection The bracing
shall be designed and detaded by the Contractor and shall be shown in the
falsework/formwork plans submitted to the Engineer for approval The Contractor shall furnish,
install, and remove the bracing at no additional cost to the Contracting Agency
� At a minimum, the Contractor shall brace girders at each end and at midspan to prevent lateral
movement or rotation This bracing shall be placed prior to the release of each girder from the
erection equipment If the bridge is constructed with cast-in-place concrete diaphragms, the
, bracing may be removed once the concrete in the diaphragms has been placed and cured for
a minimum of 24 hours
'
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 15
' Rewsed 8/27/13
6-02.3(17)H Formwork Accessories
The first paragraph is deleted and replaced with the following finro new paragraphs
Formwork accessories such as form ties, form anchors, form hangers, anchoring mserts, and
simdar hardware shall be specifically identified m the formwork plans mclud�ng the name and
size of the hardware, manufacturer, safe working load, and factor of safety The grade of steel
shall also be mdicated for threaded rods, cod rods, and simdar hardware Wire form ties shall
not be used Welding or clampmg formwork accessories to Contract Plan reinforcing steel will
not be allowed Driven types of anchorages for fastening forms or form supports to concrete,
and Contractor fabricated "J" hooks shall not be used Field drdlmg of holes in prestressed
girders is not allowed
Taper ties may be used provided the following conditions are met
The structure is not designed to resist water pressure (pontoons, floatmg dolphins,
detention vaults, etc )
2 After the taper tie is removed, plugs designed and intended for plugging taper tie
holes shall be installed at each face of concrete The plug shall be installed a
minimum of 1'/Z° clear from the face of concrete
3
4
After the plug is installed, the hole shall be cleaned of all grease, contammation and
foreign matter
Holes on the exposed faces of concrete shall be patched and finished to match the
surrounding concrete
6-02.3(25)N Prestressed Concrete Girder Erection
The third sentence in the fifth paragraph is revised to read
The girders shall be braced in accordance with Sections 6-02 3(17)F4 and 6-02 3(17)F5
6-02.3(26)E5 Leak Tightness Testing
The first sentence in the first paragraph is revised to read
The Contractor shall test each completed duct assembly for leak tightness after placing
concrete but prior to placing post tensionmg remforcement
The second paragraph is revised to read
Prior to testing, all grout caps shall be installed and all vents, grout in�ection ports, and drains
shall either be capped or have their shut-off valves closed The Contractor shall pressurize the
completed duct assembly to an initial air pressure of 50 psi This pressure shall be held for five
minutes to allow for mternal adJustments within the assembly After five minutes, the air supply
valve shall be closed The Contractor shall morntor and measure the pressure maintained
within the closed assembly, and any subsequent loss of pressure, over a period of one minute
followmg the closure of the air supply valve The maximum pressure loss for duct assemblies
equal to or less than 150 feet in length shall be 25 psig The maximum pressure loss for duct
assemblies greater than 150 feet in length shall be 15 psig If the pressure loss exceeds the
allowable, locations of leakage shall be identified, repaired or reconstructed using methods
approved by the Engineer The repaired system shall then be retested The cycle of testing,
repair and retesting of each completed duct assembly shall continue until the completed duct
assembly completes a test with pressure loss within the specified amount
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 16
Revised 8/27/13
1
'
'
�
�
'
'
,
�
,
'
'
1
�
Section 6-03, Steel Structures
August 5, 2013
6-03.3(7jA Erection Methods
The following new paragraph is inserted after the second paragraph
The Contractor may submit for approval the use of an engineered and fabricated lifting bracket
bolted to the girder top flanges providing the following requirements are satisfied
1
2
3
The lifting bracket shall be engineered and supporting calculations shall be submitted
with the erection plan,
The calculations shall include critical stresses in the girder mcluding local stresses in
the flanges at lifting bracket locations,
The calculations shall include computation of the lifting bracket and associated bolt
hole locations and the expected orientation of the girder during picking operation,
4 The liftmg bracket shall be load tested and certified for a load at least 2 times the
working load and at all angles it will be used (angle of load or rigging) Certification
documentation from a previous pro�ect may be submitted for approval,
5 Bolt holes m girders added for the lifting bracket connections shall be shown in the
shop plans and shall be drilled in the shop Field drilling of bolt holes for lifting
brackets wdl not be permitted,
6 Bolt holes m girder top flanges shall be filled with high strength bolts after erection in
accordance with Section 6-02 3(17)K �
The last sentence m the fourth paragraph (after implementing the preceding Amendment) is
revised to read
The plan, including lifting bracket working drawings and calculations, shall be prepared by (or
under the direct supervision ofl a Professional Engineer, licensed under Title 18 RCW, State of
Washmgton, in the branch of Civil or Structural, and shall carry the engineer's seal and
signature, in accordance with Section 6-02 3(16)
6-03.3(13) Fabricating Tension Members
Item number 2 is revised to read
2 Fabricated from plate stock with the primary rolling direction of the stock parallel to the
length of the member, or as shown in the Plans
' 6-03.3(28)A Method of Shop Assembly
The first sentence m Item 2 C is revised to read
' For Trusses and Girders —After the first stage has been completed, each subsequent stage
shall be assembled to include at least one truss panel or girder shop section of the previous
stage and finro or more truss panels or girder shop sections added at the advancing end
�
��
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 17
1 Revised 8/27/13
�
6-03.3(32) Assembling and Bolting
The first sentence in the fourth paragraph is revised to read
To complete a �oint followmg one of the methods listed above, the Contractor shall fill all
remaining holes of the field connection or splice place with bolts and tighten to snug-tight
The following two new paragraphs are mserted after the fourth paragraph
The Contractor shall complete the �oint or connection within ten calendar days of installing the
first bolt or within a duration approved by the Engineer Any bolts inserted in an incomplete
connection, either loose or tightened snug-tight, which exceed the specified duration for
compfeting the connection, shall be sub�ect to the followmg requirements
Three assemblies for each size and length shall be removed from connection(s) that
are to be tensioned Rotational capacity tests shall be performed on the removed
assemblies to demonstrate the assembly has sufficient lubricant to be tensioned
satisfactordy
�
'
�
�
'
2 Five assemblies shall be removed from the connection to establish the inspection '
torque
3 {n the case of tens�on controlled boits, three assembiies shall be removed and tested
in accordance with Section 6-03 3(33)A to verrFy the mirnmum specified tension can
be achieved prior to shearing of the spime
Assemblies removed for the purpose of rotational capacity testing, determination of the
inspection torques, or verification of tension controlled bolt performance shall be replaced with
new bolts at no additional expense to the Contracting Agency To minimize the number of
removed assemblies, the Contractor may combine rotational capacity testing and inspection
torque determination as approved by the Engineer
6-03.3(33) Bolted Connections
The fourth paragraph is revised to read
All bolted connections are slip critical Painted structures reqwre either Type 1 or Type 3 bolts
Unpainted structures require Type 3 bolts Bolts shall not be galvanized unless specified in the
Contract documents AASHTO M 253 bolts shall not be galvarnzed and shall not be used in
contact with galvanized metal
In the tenth paragraph, the first paragraph of Item number 3 is revised to read
3 Twist Off Type Tension Control Structural BoldNut/Washer Assembly Method
(Tension Control Bolt Assembly) - Tension control bolt assemblies shall �nclude the
bolt, nut, and washer(s) packaged and shipped as a single assembly Unless
otherwise approved by the Engmeer, tension control bolt assembly components shall
not be interchanged for testing or installation and shall comply with all provisions of
ASTM F 1852 If approved by the Engineer, the tension control bolt assembly
components may be mterchanged within the same component lot for girder web
splices or other locations where access to both sides of the connection is restricted
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 78
Rev�sed 8/27/13
,
'
'
'
'
,
�
6-03.3(33)A Pre-Erection Testing
The following new paragraph is inserted after the fourth paragraph
Three finnst off-type tension controlled bolt assemblies, per assembly lot, shall be tested m a
bolt tension calibrator The bolts shall first be tensioned to a snug tight condition Tensioning
shall then be completed by tightening the assembly nut in a continuous operation using a
spline drive installation tool untd the spline shears from the bolt The bolt assembly tension
shall meet the requirements of Table 1 If any specimen fads, the assembly lot is re�ected
6-03.3(33)B Bolting Inspection
The first paragraph is revised to read
The Contractor, in the presence of the Pro�ect Engmeer, shall inspect the tightened bolt usmg
a calibrated inspection torque wrench, regardless of bolting method The Contractor shall
supply the inspection torque wrench Inspection shall be performed within seven calendar
days from the completion of each bolted connection or as approved by the Pro�ect Engineer
6 Setting and Grouting Masonry Plates
Item number 2 in the second paragraph is revised to read
2 Place steel shims under the masonry plates to position pin centers or bearings to line and
, grade and in relationship to each other Steel shims shall be the size and be placed at the
locations shown in the Plans,
' 6-03.3(39) Swinging the Span
The second and third paragraphs are revised to read
' After the falsework is released (spans swung free), the masonry plates, shoes, and keeper
plates are grouted, and before any load is applied, the Contractor (or the Engmeer if the
Contractmg Agency is responsible for surveying) shall survey elevations at the tenth pomts
' along the centerline on top of all girders and floorbeams The Contractor shall calculate the
theoretical top of girder or floorbeam flange elevations and compare the calculated elevations
to the surveyed elevations The theoretical pad or haunch depth shown in the Plans shall be
, increased or decreased by the diiference befinreen the theoretical and surveyed top of girder or
floorbeam elevations The soffit (deck formwork) shall be set based on the Plan bridge deck
thickness and the ad�usted pad or haunch depth
�
�
,
,
'
,
The Contractor shall submit all survey data and calculations to the Engineer for review ten
working days prior to placing any load, beyond the maximum five pounds per square foot of
form weight allowed, on the Structure
Section 6-05, Piling
August 6, 2012
6-05.5 Payment
The paragraph following the bid item, "Driving St Pile", per each is revised to read
The unit Contract price per each for "Driving (type) Pile L�" shall be full pay for driving the
pile to the ultimate bearing and/or penetration specified
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 19
' Revised 8/27/13
Section 6-06, Bridge Railings
August 6, 2012
6-06.3(2) Metal Railings
The third paragraph is revised to read
Anchor bolts shall be positioned with a template to ensure that bolts match the hole spacing of
the bottom channels or anchorage plates
Section 6-07, Painting
August 5, 2013
6-07.3(9)A Paint System
The first sentence in the second paragraph is revised to read
All paint coating components of the selected pamt system shall be produced by the same
manufacturer
6-07.3(10)H Paint System
The first and second sentences in the second paragraph are revised to read
All paint coating components of the selected paint system shall be produced by the same
manufacturer
6-07.3(10)N Field Coating Application Methods
The first sentence is revised to read
The Contractor shall apply paint materials in accordance with the manufacturer's
recommendations by air or airless spray, brush, roller, or any combination of these methods
unless otherwise specified
The third sentence is revised to read
The Contractor shall use brushes to apply the stripe coat, to ensure complete coverage
around structural geometric irregularities, and to push the paint mto gaps between existing
steel surfaces and around rivets and bolts
6-07.3(10)O Applying Field Coatings
The first sentence in the sixth paragraph is revised to read
All steel surfaces cleaned to bare metal by abrasive blast cleaning shall receive the primer
coat within the same working day as the cleaning to bare metal and before any rust begms to
form
6-07.5 Payment
The third paragraph is revised to read
The lump sum Contract price for "Clearnng and Pamting - " shall be full pay for the Work
as specified, includmg developing all submittals, arrangmg for and accommodating contact
and on-site attendance by the paint manufacturer's technical representative, furnishing and
placing all necessary staging and rigging, furnishing, operating and moormg barges, furrnshing
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 20
Rewsed 8/27/13
,
C
Ll
'
and operatmg fixed and movable work platforms, accommodatmg Contracting Agency
inspection access, conducting the Contractor's quality control inspection program, providing
material, labor, tools, and equipment, furnishmg containers for containment waste, collect�ng
and storing containment waste, collecting, storing, testmg, and disposing of all containment
waste not conforming to the defirntion in Section 6-07 3(10)F, performing all clearnng and
preparation of surfaces to be painted, applying all coats of pamt and sealant, correcting
coating deficiencies, completing coating repairs, and completing pro�ect site cleanup
The first sentence in the fourth paragraph is revised to read
Progress payments for "Cleaning and Painting - " will be made on a monthly basis and
, wdl be based on the percentage of the total estimated area satisfactorily cleaned and coated
as determined by the Pro�ect Engineer
C�
�
Section 6-10, Concrete Barrier
August 5, 2013
6-10.3 Construction Requirements
This section is supplemented with the following
' Steel welded wire remforcement deformed, conformmg to Section 9-07 7, may be substituted
in concrete barner in place of deformed steel bars conforming to Section 9-07 2, sub�ect to the
following conditions
,
,
'
,
�
'
'
�
�J
,
Steel welded wire reinforcement spacing shall be the same as the deformed steel bar
spacing as shown in the Standard Plans +
2 The minimum cross sectional area for steel welded wire remforcement shall be no
less than 86 percent of the cross sectional area for the deformed steel bars being
subst�tuted
3 Development lengths and splice lengths shall conform to requirements specified in
the AASHTO LRFD Bridge Design Specifications, current edition
6 Placing Concrete Barriers
The first and second sentences in the first paragraph are revised to read
Precast concrete barrier Types 2 and 4, precast single slope barrier, and transitions shall rest
on a paved foundation shaped to a uniform grade and section The foundation surface for
precast concrete barrier Types 2 and 4, precast smgle slope barrier, and transitions shall meet
this test for urnformity
6-10.5 Payment
In the second paragraph, the bid item "Conc Class 4000" is revised to read
"Conc Class 4000 "
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 21
' Revised 8/27h 3
Section 6-12, Noise Barrier Walls
August 6, 2012
6-12.3(3) Shaft Construction
The third sentence in the fifth paragraph is revised to read
When efforts to advance past the obstruction to the design shaft tip elevation result in the rate
of advance of the shaft dnlling equipment being sigrnficantly reduced relative to the rate of
advance for the rest of the shaft excavation, then the Contractor shall remove the obstruction
under the provisions of Section 6-12 5
6-12.3(6) Precast Concrete Panel Fabrication and Erection
The second sentence in item number 3 is deleted
6-12.5 Payment
This section is supplemented with the following
"Removing Noise Barrier Wall Shaft Obstructions", estimated
Payment for removing obstructions, as defined in Section 6-12 3(3), will be made for the
changes in shaft construction methods necessary to remove the obstruction The Contractor
and the Engineer shall evaluate the effort made and reach agreement on the equipment and
employees utilized, and the number of hours involved for each Once these cost items and
their duration have been agreed upon, the payment amount wdl be determined using the rate
and markup methods specified m Section 1-09 6 For the purpose of provid�ng a common
proposal for all bidders, the Contracting Agency has entered an amount for the item
"Removing Noise Barrier Wall Shaft Obstructions" in the bid proposal to become a part of the
total bid by the Contractor
If the shaft construction equipment is idled as a result of the obstruct�on removal work and
cannot be reasonably reassigned within the pro�ect, then standby payment for the idled
equipment wdl be added to the payment calculations If labor is idled as a result of the
obstruction removal work and cannot be reasonably reassigned withm the pro�ect, then all
labor costs resulting from Contractor labor agreements and establ�shed Contractor policies will
be added to the payment calculations
The Contractor shall perform the amount of obstruction work estimated by the Contracting
Agency withm the original time of the contract The Engmeer wdl cons�der a t�me ad�ustment
and additional compensation for costs related to the extended duration of the shaft
construction operations, provided
the dollar amount estimated by the Contract�ng Agency has been exceeded, and,
2 the Contractor shows that the obstruction removal work represents a delay to the
completion of the pro�ect based on the current progress schedule provided in
accordance with Section 1-08 3
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 22
Revised 8/27/13
'
�
'
�
�
�
�
C�
'
'
�
'
�
'
'
Section 6-13, Structural Earth Walls
April 1, 2013
6-13.2 Materials
In the first paragraph, the following item is mserted after the item "Aggregates for Portland Cement
Concrete"
Gravel Borrow for Structural Earth Walis 9-03 14(4)
6-13.4 Measurement
In the second paragraph, "Backfill° is revised to read "Gravel borrow"
6-13.5 Payment
In this section, the bid item "Backfill for Structural Earth Wall Incl Haul" is revised to read
"Gravel Borrow for Structural Earth Wall incl Haul"
Section 6-14, Geosynthetic Retaining Walls
April 1, 2013
6-14.2 Materials
The first paragraph is revised to read
Materials shall meet the requirements of the following sections
Portland Cement
Aggregates for Portland Cement Concrete
Sand
Gravel Borrow for Structural Earth Wall
Polyurethane Sealant
Closed Cell Foam Backer Rod
Anchor Rods and Associated Nuts, Washers, and Couplers
Remforcing Steel
Wire Mesh for Concrete Reinforcement
G rout
Construction Geosynthetic
9-01
9-03 1
9-03 13(1)
9-03 14(4)
9-04 2(3)
9-04 2(3)A
9-06 5(1)
9-07
9-07 7
9-20 3(4)
9-33
6-14.4 Measurement
In the second paragraph, "geosynthetic retaining wall backfill" is revised to read "structural earth
wall backfdl"
6-14.5 Payment
In this section, the bid item "Gravel Borrow for Geosynthetic Ret Wall Incl Haul" Is revised to
read
"Gravel Borrow for Structural Earth Wall incl Haul"
'
'
,
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK - Page 23
' Rewsed 8/27/13
Section 6-15, Soil Nail Walls
January 2, 2012
6-15.2 Materials
The referenced section for the following item is revised to read
Grout
9-20 3(4)
6-15.3(3) Submittals
Item f beneath item number 3 is revised to read
Mix design and procedures for placing the grout
6-15.3(6) Soil Nailing
This section is supplemented with the following
The Contractor shall make and cure grout cubes once per day m accordance with WSDOT
Test Method T 813 These samples shall be retamed by the Contractor untd all associated
verification and proof testing of the sod nails has been successfully completed if the
Contractor elects to test the grout cubes for compressive strength, testing shall be conducted
by an independent laboratory and shall be in accordance with the WSDOT FOP for AASHTO
T106
Section 6-16, Soldier Pile and Soldier Pile Tieback Walls
January 2, 2012
6-16.3(3) Shaft Excavation
The third sentence m the seventh paragraph is revised to read
When efforts to advance past the obstruction to the design shaft tip elevation result in the rate
of advance of the shaft drilling equipment being significantly reduced relative to the rate of
advance for the rest of the shaft excavation, then the Contractor shall remove the obstruction
under the provisions of Section 6-16 5
6-16.5 Payment
This section is supplemented with the following
"Removing Soldier Pde Shaft Obstructions", estimated
Payment for removing obstructions, as defined in Section 6-16 3(3), will be made for the
changes in shaft construction methods necessary to remove the obstruction The Contractor
and the Engineer shall evaluate the effort made and reach agreement on the equipment and
employees utilized, and the number of hours involved for each Once these cost items and
their duration have been agreed upon, the payment amount will be determined using the rate
and markup methods specified in Section 1-09 6 For the purpose of providing a common
proposal for all bidders, the Contracting Agency has entered an amount for the item
"Removing Soldier Pde Shaft Obstructions" m the bid proposal to become a part of the total
bid by the Contractor
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 24
Revised 8/27h3
1
If the shaft construction equipment is idled as a result of the obstruction removal work and
' cannot be reasonably reassigned within the pro�ect, then standby payment for the idled
equipment wdl be added to the payment calculations If labor is idled as a result of the
obstruction removal work and cannot be reasonably reassigned within the pro�ect, then all
' labor costs resulting from Contractor labor agreements and established Contractor policies will
be added to the payment calculations
'
'
�
'
�
�
,
The Contractor shall perform the amount of obstruction work estimated by the Contracting
Agency withm the ongmal time of the contract The Engineer will consider a time ad�ustment
and additional compensation for costs related to the extended duration of the shaft
construction operations, provided
the dollar amount estimated by the Contracting Agency has been exceeded, and,
2 the Contractor shows that the obstruction removal work represents a delay to the
completion of the pro�ect based on the current progress schedule provided in
accordance with Section 1-08 3
Section 6-17, Permanent Ground Anchors
August 6, 2012
6-17.3(3) Submittals
The first sentence in the sixth paragraph is revised to read
The Contractor shall submit the mix design for the grout conforming to Section 9-20 3(4) and
the procedures for placmg the grout to the Engineer for approval
6-17.3(7) Installing Permanent Ground Anchors
The following new paragraph is inserted after the sucth paragraph
� The Contractor shall make and cure grout cubes once per day in accordance with WSDOT
Test Method T 813 These samples shall be retained by the Contractor untd all associated
venfication, performance and proof testing of the permanent ground anchors has been
' successfully completed if the Contractor elects to test the grout cubes for compressive
strength, testing shall be conducted by an independent laboratory and shall be in accordance
with the WSDOT FOP for AASHTO T106
'
�
'
'
,
'
6-17.3(9) Permanent Ground Anchor Acceptance Criteria
The fourth paragraph is deleted
Section 6-19, Shafts
August 5, 2013
6-19.3(2) Submittal
This section including title is revised to read
Shaft Construction Submittals
The shaft construction submittal shall be comprised of the following three components
construction experience, shaft installation narrative, and shaft slurry techrncal assistance The
submittal shall be submitted in a PDF format to the Pro�ect Engineer a mirnmum of 30
calendar days prior to the start of the Work
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 25
' Rev�sed 8/27/13
6-19.3(2)A Construct�on Experience Submittal
This section's title is revised to read
Construction Exper�ence
The first sentence in the first paragraph is revised to read
The Contractor shall submit a pro�ect reference list to the Pro�ect Engineer for verifying the
successful completion by the Contractor of at least three separate foundation pro�ects with
shafts of diameters and depths simdar to or larger than those shown in the Plans, and ground
conditions simdar to those identified in the Contract
The first sentence in the second paragraph is revised to read
The Contractor shall submit a list identifying the on-site supervisors and drill rig operators
potentially assigned to the pro�ect to the Pro�ect Engineer
The first and second sentences in the last paragraph are deleted
6-19.3(2)B Shaft Installation Narrative Submittal
This section's title is revised to read
Shaft Installation Narrative
The first sentence in the first paragraph is revised to read
The Contractor shall submit a shaft installation narrative to the Engineer
Item number 4(except the table) is revised to read
4 A slurry mix design, including all additives and their specific purpose in the slurry mix, with
a discussion of its suitabdity to the ant�cipated subsurface conditions shall be submitted
and include the procedures for mixing, using, and maintaining the slurry A detailed plan
for quality control of the selected slurry, including tests to be performed, test methods to
be used, and minimum and/or maximum property requirements wh�ch must be met to
ensure the slurry functions as intended, considermg the anticipated subsurface conditions
and shaft construction methods, in accordance with the slurry manufacturer's
recommendations and these Special Prov�sions shall be mcluded As a mmimum, the
slurry quality control plan shall include the following tests
Item number 9 is revised to read (except the lettered items)
9 Reinforcing steel shop drawings with detads of reinforcement placement, mcluding
bracing, centering, and lifting methods, and the method to ensure the reinforcing cage
position is maintained during construction, including use of bar boots and/or rebar cage
base plates, and including placement of rock backfill below the bottom of shaft elevation,
provided the conditions of Section 6-19 3(5)D are satisfied
The reinforcing steel shop drawings and shaft �nstallation narrative shall include, at a
mmimum
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 26
Rewsed 8/27M3
�
'J
'
'
,
'
�
�
�
'
,
��
,
,
�
�
'
The paragraph following item number 9 n is deleted
The first sentence in the paragraph following item number 9 n (after implementing the preceding
Amendment) is revised to read
The Engineer wdl evaluate the shaft installation narrative for conformance with the Plans,
Specifications, and Special Provisions, withm the review time specified
6-19.3(2)C Shaft Slurry Technical Assistance Submittal
This section's title is revised to read
Shaft Slurry Technical Assistance
The second sentence in the first paragraph (except for the numbered items) is revised to read
The Contractor shall submit the following to the Engineer
6-19.3(4)B Minimum Level of Slurry in the Excavation
This section is revised to read
When slurry is used in a shaft excavation the following is required
1
2
3
The height of the slurry shall be as requi�ed to provide and maintain a stable hole to
prevent bottom heave, cav�ng, or sloughing of all unstable zones
The Contractor shall provide casing, or other means, as necessary to meet these
requirements
The slurry level in the shaft while excavating shall be maintained above the
groundwater level the greater of the following dimensions
a Not less than 5 feet for mineral slurries �
b Not less than 10 feet for water slurnes
c Not less than 10 feet for synthetic slurries
4 The slurry level in the shaft throughout all stops as specified in Section 6-19 3(3)A
and during concrete placement as specified in Section 6-19 3(7) shall be no lower
than the water level elevation outside the shaft
6-19.3(4)F Slurry Disposal
This section mcluding title is revised to read
6-19.3(4jF Disposal of Sturry and Slurry Contacted Spoils
The Contractor shall dispose of the slurry and slurry-contacted spoils as specified in the shaft
mstallation narrative in accordance with Section 6-19 3(2)B, item 8, and in accordance with the
followmg requirements
1 Water slurry with no additives may be infi(trated to an upland area within the confines
� of the Contracting Agency Right of Way for the pro�ect Infdtration is allowed provided
the ground-Ime at the disposal site is at least 5 feet above the current water table,
'
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 27
' Revised 8/27N3
and that disposal operations conform to the temporary erosion and sedimentation
control (TESC) requirements established for this pro�ect For the purposes of water
slurry disposal, upland is defined as an area that has no chance of discharging
directly to waters of the State, including wetlands or conveyances that indirectly lead
to wetlands or waters of the State Spoils in contact with this slurry may be disposed
of as clean fill
2 Synthetic slurry and water slurry with polymer-based additives shall be contained and
disposed of by the Contractor at an approved facdity The Contractor shall acqwre all
permits or approvals necessary for disposal of the slurry and shall provide copies to
the Engineer Spods in contact with synthetic slurry or water slurry with polymer-
based additives shall be disposed of in accordance with Section 2-03 3(7)C With
approval of the Engineer, the Contractor may re-use these spoils on-site
3 Mmeral slurry may be infilt�ated to a temporary sediment trap located in an upland
area within the confines of the Contractmg Agency Right of Way for the pro�ect
Infiltration is allowed provided the ground-line at the disposal site�is at least 5 feet
above the current water table, and that disposal operations conform to the temporary
erosion and sedimentation control (TESC) requirements established for this pro�ect
For the purposes of mineral slurry disposal, upland is defined as an, area that has no
chance of discharging directly to waters of the State, including wetlands or
conveyances that indirectly lead to wetlands or waters of the State Spoils in contact
with mineral slurry shall be disposed of in accordance with Section 2-03 3(7)C With
approval of the Engineer, the Contractor may re-use these spoils on-s�te
Section 7-02, Culverts
August 6, 2012
7-02.2 Materials
Note 3 in the table titled, "Culvert P�pe Schedules" is revised to read
3 Polypropylene pipe, 12 inch to 30 mch diameters approved for Schedule A and Schedule B,
36 inch to 60 inch diameters approved for Schedule A only
7-02.5
The bid item "Steel Rib Reinforced Polyethylene Culvert Pipe In Diam ", per linear foot is
revised to read
"St Rib Reinf Polyethylene Culv Pipe In Diam ", per linear foot
Section 7-03, Structural Plate Pipe, Pipe Arch, Arch, and Underpass ,
August 6, 2012 `
7-03.3(1) Foundations, General
This section is supplemented with the followmg
When aluminum pipe or pipe arch is in contact with cement concrete, finro coats of paint shall
be applied in accordance with Section 7-08 3(2)D
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 28
Revised 8/27/13
�
�
�
,
,
��
'
�
�
�
7-03.3(5) Headwalls
This section is supplemented with the following
When aluminum pipe or pipe arch is in contact with cement concrete, two coats of paint shall
be applied in accordance with Section 7-08 3(2)D
Section 7-04, Storm Sewers
August 6, 2012
7 Exfiltration Test — Storm Sewers
The fifth column title "PE is revised to read "PP'�" from the table titled, "Storm Sewer Pipe
Schedules°
Note 4 in the table titled, "Storm Sewer Pipe Schedules" is revised to read
4 PP = Polypropylene Pipe, 12 inch to 30 inch approved for Schedule A and Schedule B, 36
inch to 60 inch diameters approved for Schedule A only
7-04.5
The bid item "Steel Rib Reinforced Polyethylene Storm Sewer Pipe In Diam", per linear foot
is revised to read
"St Rib Reinf Polyethylene Storm Sewer Pipe in Diam", per linear foot
Section 7-05, Manholes, Inlets, Catch Basins, and Drywells
April 2, 2012
7-05.3 Construction Requirements
The third paragraph is supplemented with the following
� Leveling and ad�ustment devices that do not modify the structural mtegrity of the metal frame,
grate or cover, and do not void the originating foundry's compliance to these specifications and
warranty is allowed Approved leveling devices are listed in the Qualified Products List
' Leveling and ad�usting devices that mterfere with the backfillmg, backfill density, grouting and
asphalt density will not be allowed The hardware for leveling and ad�usting devices shall be
completely removed when specified by the Pro�ect Engineer
�
l,�
'
t
'
�
Section 7-08, General Pipe Installation Requirements
August 6, 2012
7-08.3(2)D Pipe Laying — Steel or Aluminum
The following new sentence is inserted after the first sentence in the second paragraph
The paint shall cover all the surFace in contact with the concrete and extend one inch beyond
the point of contact '
Section 7-09, Water Mains
August 6, 2012
7-09.3(19)A Connections to Existing Mains
In the second paragraph, "Special Conditions" is revised to read "Special Provisions"
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 29
' Rev�sed 8/27/13
Section 8-01, Erosion Control and Water Pollution Control
August 5, 2013
8-01.2 Materials
The first paragraph is revised to read
Materials shall meet the requirements of the following sections
Corrugated Polyethylene Drain Pipe
Quarry Spalls
Seed
Fertilizer
Mulch and Amendments
Tackifiers
Erosion Control Devices
High Visibility Fence
Construction Geotextile
9-05 1(6)
9-13
9-14 2
9-14 3
9-14 4
9-14 4(7)
9-14 5
9-14 5
9-33
8-01.3(1) General
The last finro sentences in the first paragraph are deleted
In the seventh paragraph, "perimeter silt fencing" is revised to read "silt fencing"
8-01.3(2)D Mulching
The following two new paragraphs are inserted after the fourth paragraph
Short-Term Mulch shall be hydraulically applied at the rate of 2500 pounds per acre and may
be applied in one lift
Moderate-Term Mulch and Long-Term Mulch shall be hydraulically applied at the rate of 3500
pounds per acre with no more than 2000 pounds applied in any single lift
8-01.3(2)E Soil Binders and Tacking Agents
This section including title is revised to read
8-01.3(2)E Tackifiers
Tackifiers applied using a hydroseeder shall have a mulch tracer added to visibly aid uniform
application This tracer shall not be harmful to plant, aquatic, or animal life A mirnmum of 125
pounds per acre and a maximum of 250 pounds per acre of Short-Term Mulch shall be used
as a tracer Tackifier shall be mixed and applied in accordance with the manufacturer's
recommendations
Soil Binding Using Polyacrylamide (PAM) — The PAM shall be applied on bare sod
completely dissolved and mixed in water or applied as a dry powder Dissolved PAM shall be
applied at a rate of not more than z/ pound per 1,000 gallons of water per acre A minimum of
200 pounds per acre of Short-Term Mulch shall be applied with the dissolved PAM Dry
powder applications may be at a rate of 5 pounds per acre using a hand-held fertilizer
spreader or a tractor-mounted spreader
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 30
Revised 8/27/13
'
PAM shall be applied only to areas that drain to completed sedimentation control BMPs in
' accordance with the TESC Plan PAM may be reapplied on actively worked areas after a 48-
hour period
'
'
�
,
'
,
1
u
'
PAM shall not be applied durmg rainfall or to saturated sods
8 Dates for Application of Final Seed, Fertilizer, and Mulch
In the first paragraph, "Engineer" is revised to read "Pro�ect Engineer"
Note 1 of the table in the first paragraph is revised to read
' Where Contract timmg is appropriate, seedmg, fertdizing, and mulching shall be
accomplished durmg the fall period listed above
The third paragraph is deleted
8-01 3(3) Plaang Erosion Control Blanket
This section mcluding title is revised to read
8-0'!.3(3) Placing Biodegradable Erosion Control Blanket
Biodegradable Erosion Control Blankets are used as an erosion prevention device and to
enhance the establishment of vegetation Erosion control blankets shall be installed according
to the manufacturer's recommendations
Seeding and fertdizmg shall be done prior to blanket mstallation
Select erosion control blanket material for an area based on the mtended function slope or
ditch stabdization, and site specific factors including soil, slope gradient, rainfall, and flow
exposure Erosion Control Blankets shall not be used on slopes or in ditches that exceed the
manufacturer's recommendations
8-01.3(4) Placing Compost Blanket
This section is revised to read
, Compost blanket shall be placed to a depth of 3 inches over bare soil Compost blanket shall
be placed prior to seeding or other planting An organic tackifier shall be placed over the entire
composted area when dry or windy conditions are present or expected before the final
' application of mulch or erosion control blanket The tackifier shall be applied immediately after
the application of compost to prevent compost from leaving the composted area
�
�
'
,
'
Compost shall be Medium Compost
8-01.3(5) Placing Plastic Covering
This section including title is revised to read
Plastic Covering
Erosion Control - Plastic covenngs used to temporardy cover stock piled materials,
slopes or bare sods shall be installed and maintained in a way that prevents water from
mtruding under the plastic and prevents the plastic cover from blowing open in the wind
Plastic cover�ngs shall be placed with at least a 12-mch overlap of all seams and be a
mirnmum of 6 mds thick
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 31
, Rev�sed 8127/13
�
Containment - Plastic covenngs used to line concrete washout areas, contam
wastewaters, or used in secondary containment to prevent spills, shall be seamless to '
prevent infiltration and be a minimum of 10 mils thick
Vegetation Management
shall be clear and where
minimum of 4 mds thick
8 Check Dams
This section is revised to read
Check dams are used as an erosion and sediment control device in channels or conveyance
areas Check dams shall be installed as soon as construction wdl allow, or when designated
by the Pro�ect Engineer The Contractor may substitute a different check dam material, in lieu
of what is specified m the contract, with approval of the Pro�ect Engineer Check dam materials
shall meet the requirements m Section 9-14 5(4) Straw bales shall not be used as check
dams The check dam is a temporary or permanent structure, built across a mmor channel
placed perpendicular to the flow of water Water shall not flow freely through the check dam
structure Check dams shall be constructed in a manner that creates a ponding area upstream
of the dam to allow pollutants to settle, with water from increased flows channeled over a
spiliway m the check dam The check dam shall be constructed to prevent erosion in the area
below the spolway The outer edges shall extend up the sides of the conveyance to prevent
water from going around the check dam Check dams shall be of sufficient height to maximize
detention, without causing water to leave the ditch
Wattles, coir logs and compost sock used as check dams shall not be trenched in and shall be
installed as shown in the Standard Plans
When wattles, coir logs, and compost socks are used as check dams they shall be measured
and paid as check dam in accordance with Section 8-01 4 and 8-01 5
8-01.3(6)A Geotextile-Encased Check Dam
This sections content including title is deleted
8-01.3(6)B Quarry Spall Check Dam
This sections content includmg title is deleted
8 Sandbag Check Dam
This sections content includmg title is deleted
8 Wattle Check Dam
This sections content including title is deleted
8-01.3(6)E Coir Log
This section mcluding title and section number is revised to read
8-01.3(6)A Coir Log
Coir logs are used as erosion and sediment control or bank stabilizing device Coir logs shall
be laid out, spaced, staked and installed in accordance with the Standard Plans
Live stakes in accordance with Section 9-14 6(1) can be used in addition to, but not as a
replacement for, wooden stakes
- Plastic covenng placed over areas that have been seeded
vegetative growth is to inhibited it shall be black and be a '
'
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 32
Rewsed 8/27/13
,
'
'
L_ l
�
'
,
�
�J
'
'
�
8-01.3(7) Stabilized Construction Entrance
The first paragraph is revised to read
Temporary stabilized construction entrance shall be constructed in accordance with the
Standard Plans, prior to beginning any clearing, grubbing, embankment or excavation All
quarry spall material used for stabdized construction entrance shall be free of extraneous
materials that may cause or contnbute to track out
8-01.3(9)A Silt Fence
This section and all sub-sections including title is revised to read
8-01 3(9)A Fencing
8-01.3(9)A1 High Visibility Fencing
High visibility fencing (HVF) shall be orange in color and installed along the site
preservation lines shown in the Plans or as specified by the Engineer Post spacing and
attachment of the fencing matenal to the posts shall be as shown in the Standard Plans
and in accordance with Section 9-14 5(8) The HVF shall not be fastened to trees
8-01.3(9)A2 Silt Fence
Sdt fence shall be black in color and used as a sediment control device to prevent
sediment laden water from leaving pro�ect boundaries, to manage stormwater within the
site, or to create small detention areas Silt fence shall be installed at locations shown in
the Plans The geotextile shall be securely attached to the posts and support system
Post spaang and attachments shall be as shown in Standard Plans
Geotextile matenal shall meet the requirements of Section 9-33 2(1), Table 6 and be sewn
together at the point of manufacture, or at a location approved by the Engineer, to form
geotextde lengths as required All sewn seams and overlaps shall be located at a support
post
Posts shall be either wood or steel Wood posts shall have minimum dimensions of 1'/4 by
1'/4 inches by the minimum length shown in the Plans
When sediment deposits reach approximately '/3 the height of the sdt fence, the deposits
shall be removed and stabdized in accordance with Section 8-01 3(15)
If trenching is not feasible due to rocky soils or not advisable due to proximity to a
' downslope sensitive area, a different sediment control device that does not require
trenching shall be used in place of sdt fence
' S�It Fence with Backup Support
Where backup support is needed for sdt fence in areas where extra strength may be
required, such as the toe of steep cut or fdl slopes or areas where equipment may push
excessive sods toward the fence When backup support is used, wire shall have a
' maximum mesh spacing of 2 inches, and the plastic mesh shall be as resistant to
ultraviolet radiation as the geote�ctde it supports The strength of the wire or plastic mesh
shall be equivalent to or greater than as required in Section 9-33 2(1), Table 6, for
' unsupported geotextile (i e, 180 Ibs grab tensde strength in the machine direction) Post
spacmg and attachments shall be as shown in Standard Plans
�
C �
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 33
' Revised 8/27/13
O
8-01.3(9)A3 High Visibility Silt Fence
High visibdity sdt fence (HVSF) shall be orange in color and only be used for the dual
purpose of demarcating site preservation Imes and a sediment control device in a location
where high visibility mesh fence and black sdt fence would otherwise be used together at
same location If use of HVSF is allowed the geotextde material shall meet the material
requirements of Section 9-33 2(1), Table 6 Post spacing and attachments shall be as
shown in Standard Plans
Hogh Visibility Silt Fence w�th Backup Support
Where backup support is needed for high visibdity silt fence (HVSF) in areas where extra
strength may be required, such as the toe of steep cut or fdl slopes or areas where
equipment may push excessive soils toward the sensitive or protected areas When
backup support is used, wire shall have a maximum mesh spacing of 2 inches, and the
plastic mesh shall be as resistant to ultraviolet radiation as the geotextile it supports The
strength of the wire or plastic mesh shall be equivalent to or greater than as required m
Section 9-33 2(1), Table 6, for unsupported geotextde (i e, 180 Ibs grab tensile strength
in the machine direction) Post spacmg shall be as shown in Standard Plans
When sediment deposits reach approximately 1/3 the height of the sdt fence, or 8 inches
whichever is lower, the deposits shall be removed and stabilized in accordance with
Section 8-01 3(15)
8 Gravel Filter, Wood Chip, or Compost Berm
The first paragraph is revised to read
Fdter berms shall retain sediment and direct flows The gravel fdter berm shall be a mirnmum
of 1 foot in height and shall be maintained at this height for the entire time they are in use
Rock material used for fdter berms shall meet the grading requirements m Section 9-03 9(2),
but shall not mclude any recycled materials as outlined m Section 9-03 21
The last sentence m the third paragraph is revised to read
Compost shall be Medium Compost
8 Straw Bale Barrier
This section including title is revised to read
8-01.3(9)C Vacant
5-01.3(10) Wattles
This section is revised to read
Wattles are used as a flow control and sediment control device Wattles shall be installed as
soon as construction wdl allow or when designated by the Engmeer Wattle installation and
trenching shall begin from the base of the slope and work uphill prior to any topsoil or compost
placement Excavated material from trenching shall be spread evenly along the uphill slope
and be compacted using hand tampmg or other method approved by the Engineer On
gradually sloped or clay-type soils trenches shall be 2 to 3 inches deep On loose sods, in high
rainfall areas, or on steep slopes, trenches shall be 3 to 5 inches deep, or half the thickness of
the wattle, whichever is greater
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Revised 8/27/13
C�
'
'
'
'
'
�
�
�
�
�
�
� '
�J
�
�
�
Page 34
'
�
'
'
'
'
�
�
�
'
'
'
,
,
,
'
'
'
'
Wattles shall be laid out, spaced and staked in accordance with the Standard Plans Live
stakes in accordance with Section 9-14 6(1) can be used in addition to, but not as a
replacement for, wooden stakes If trenching and stakmg is not possible due to rocky sods,
compost socks shall be used instead of wattles
The Contractor shall exercise care when installing wattles to ensure the method of installation
minimizes disturbance and prevents sediment or pollutant discharge into water bodies
8-01.3(11) Vacant
This section including title is revised to read
8-01.3(11) Outlet Protection
Outlet protection shall prevent scour at the outlets of ponds, pipes, ditches or other
conveyances All quarry spall material used for outlet protection shall be free of extraneous
material and meet the gradation requirements in Section 9-13 6
8-01.3(12) Compost Socks
This section is revised to read
Compost socks are used as a flow control and sediment control device Compost socks shall
be installed as soon as construction will allow or when designated by the Pro�ect Engineer
Compost socks shall be installed pnor to any mulching or compost placement Compost socks
shall be laced together end-to-end with coir rope or ends shall be securely overlapped to
create a continuous length Terminal ends of the contmuous length shall be curved 2 to 4 feet
upward into the slope to prevent concentrated flows from going around the terminal ends
Finished grades shall be of a natural appearance with smooth transitions Compost for
compost socks shall be Medium Compost
Compost sock shall be laid out, spaced and staked in accordance with the Standard Plans
Live stakes in accordance with Section 9-14 6(1) can be used in addition to, but not as a
replacement for, wooden stakes If staking is not possible or if the compost sock is being used
on concrete, heavy blocks or an equivalent item shall be used to weigh down and secure the
sock Compost socks shall be laid out, spaced and staked in accordance with the Standard
Plans
The Contractor shall exercise care when installmg compost socks to ensure that the method of
installation minimizes disturbance of waterways and prevents sediment or pollutant discharge
into water bodies Stakes shail be removed to mirnmize sod disturbance
8-01.3(13) Temporary Curb
This section is revised to read
Temporary curbs shall divert or redirect water around erodible sods
Temporary curbs shall be mstalled along pavement edges to prevent runoff from flowing onto
erodible slopes Water shall be directed to areas where erosion can be controlled The
temporary curbs shall be a minimum of 4 inches in height Ponding shall not be in roadways
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 35
' Revised 8/27/13
8-01.3(16) Removal
The first sentence in the first paragraph is revised to read
When the Pro�ect Engineer determmes that an erosion control BMP is no longer required, the
Contractor shall remove the BMP and all associated hardware from the pro�ect limits
The first and second sentences in the second paragraph are revised to read
The Contractor shall remove BMPs and associated hardware in a way that mirnmizes soil
disturbance The Contractor shall permanently stabdize all bare and disturbed soil after
removal of BMP's
8-01.4 Measurement
The third paragraph is revised to read
Check dams will be measured per linear foot one time only along the completed check dam
No additional measurement wdl be made for check dams that are required to be rehabditated
or replaced due to wear
The ninth paragraph is deleted
The twelfth paragraph (after the preceding amendment is applied) is revised to read
Seeding, fertdizing, limmg, mulching, mowing, and tackifier wdl be measured by the acre by
ground slope measurement or through the use of design data
The fifteenth paragraph (after the preceding amendment is applied) is revised to read
Fencing wdl be measured by the linear foot along the ground line of the completed fence
This section is supplemented with the following
Outlet Protection wdl be measured per each irntial installation at an outlet location
8-01.5 Payment
The paragraph followmg the bid item, "Plastic Covering", per square yard is revised to read
The unit Contract price per square yard for "Plastic Covermg" shall be full payment to perform
the Work as specified in Section 8-01 3(5) and as shown in the Plans, mcluding removal and
disposal at an approved disposal site
The bid item "Straw Bale", per each is deleted
The bid item " Erosion Control Blanket", per square yard is deleted
The bid item "Sod Binder or Tacking Agent", per acre is deleted
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 36
Revised 8/27/13
�
�
�
�
This section is supplemented with the following
"Outlet Protection", per each
The urnt Contract price per each for "Outlet Protection" shall be full payment for all costs
incurred to complete the Work
"Tackifier", per acre
The unit Contract price per acre for "Tackifier" shall be full payment for all costs incurred to
complete the Work
"Biodegradable Erosion Control Blanket", per square yard
' The urnt Contract price per square yard for "Biodegradable Erosion Control Blanket" shall be
full pay for all costs to complete the specified Work
�_1
�
'
�
'
'
'
C J
�
L���
�
�
'
"High vsibdity Sdt Fence", per linear foot
Section 8-02, Roadside Restoration
August 5, 2013
In this section, "psiPE" is revised to read "PSIPE"
8-02.3(2) Roadside Work Plan
The first sentence m the second paragraph is revised to read
The Roadside Work Plan shall also mclude a copy of the approved progress schedule
The sub paragraph titled "Progress Schedule" is deleted
8 Topsoil Type C
In this section, "9-14 1(2)" is revised to read "9-14 1(3)"
8-02.3(8) Planting
Item number 1 in the second paragraph is revised to read
1 Non-Irrigated Plant Material
West of the summit of the Cascade Range - October 1 to March 1
East of the summit of the Cascade Range - October 1 to November 15
8-02.4 Measurement
The first sentence is revised to read
Topsoil, mulch and soil amendments wdl be measured by the acre along the grade and slope
of the area covered immediately after application
The seventh sentence is rewsed to read
Compost wdl be measured by the acre along the grade and slope of the area covered
immediately after application
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 37
, Rewsed 8/27/13
8-02.5 Payment
The bid item "Topsoil Type ", per cubic yard and followmg paragraph are revised to read
"Topsoil Type ", per acre
The urnt contract price per acre for "Topsod Type " shall be full pay for providing the
source of material for topsod Type A and C, for pre-excavation weed control, excavating,
loadmg, hauling, intermediate windrowing, stockpding, weed control on stockpdes or windrows,
and removal, placmg, spreading, processing, cultivating, and compactmg topsoil Type A, Type
B, and Type C
The bid item "Fine ComposY', per cubic yard is revised to read
"Fine ComposY', per acre
The bid item "Medium Compost", per cubic yard is revised to read
"Medium Compost", per acre
The bid item "Coarse Compost", per cubic yard and following paragraph are revised to read
"Coarse Compost", per acre
The unit Contract price per cubic yard for "Fine Compost", Medium Compost" or "Coarse
Compost" shall be full pay for furrnshing and spreading the compost onto the existing soil
The bid item "Sod AmendmenY', per cubic yard and following paragraph are revised to read
"Sod Amendment", per acre
The unit Contract price per acre for "Soil Amendment" shall be full pay for furrnshing and
incorporating the mulch onto the existing sod
The bid item "Bark or Wood Chip Mulch", per cubic yard and followmg paragraph are revised to
read
"Bark or Wood Chip Mulch", per acre
The unit Contract price per acre for "Bark or Wood Chip Mulch" shall be full pay for furnishing
and spreading the mulch onto the existing sod
Section 8-03, Irrigation Systems
April 2, 2012
8-03.3(7) Flushing and Testing
The fifth paragraph is deleted
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 38
Rewsed 8/27/13
'
'
'
,
'
�
'
�
,
�
Section 8-04, Curbs, Gutters, and Spiliways
April 2, 2012
8-04.3(1) Cement Concrete Curbs, Gutters, and Spiliways
This section is supplemented with the following new sub-section
8-04 3(1)B Roundabout Cement Concrete Curb and Gutter
Roundabout cement concrete curb and gutter and roundabout splitter island nosing curb shall
be shaped and finished to match the shape of the ad�oining curb as shown in the Plans All
other requirements for cement concrete curb and cement concrete curb and gutter shall apply
to roundabout cement concrete curb and gutter
8-04.4 Measurement
This section is supplemented with the following
Roundabout splitter island nosing curb wdl be measured per each
8-04.5 Payment
The bid item, "Roundabout Truck Apron Cement Concrete Curb", per linear foot is deleted
This section is supplemented with the following
"Roundabout Cement Concrete Curb and Gutter", per linear foot
The unit Contract price per Imear foot for "Roundabout Cement Concrete Curb and Gutter"
shall be full payment for all costs for the Work including transitioning the roundabout cement
concrete curb and gutter to the ad�oining curb shape
"Roundabout Splitter Island Nosing Curb", per each
' The unit Contract price per each for "Roundabout Splitter Island Nosmg Curb" shall be full
payment for all costs for the Work includmg transitioning the roundabout splitter island nosing
curb to the ad�oirnng curb shape
'
'
�
�
r
1
�
Section 8-07, Precast Traffic Curb and Block Traffic Curb
January 7, 2013
This section's title is revised to read
8-07 Precast Traffic Curb
8-07.1 Description
This section is revised to read
This Work consists of furnishmg and installing precast traffic sloped mountable curb or dual
faced sloped mountable curb of the design and type specified in the Plans in accordance with
these Specifications and the Standard Plans in the locations indicated in the Plans or as
staked by the Engineer
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 39
' Rewsed 8/27/13
�
8-07.2 Materials
The mater�al reference "Block Traffic Curb 9-18 3" is deleted from this section
The referenced section for the following item is revised to read
Paint 9-34 2
8-07.3(1) Installing Curbs
The fifth and seventh paragraphs are deleted from this section
8-07.4 Measurement
The first paragraph is deleted from this section
8-07.5 Payment
The following bid items are deleted from this section
"Type A Precast Traffic Curb", per linear foot
"Type C Precast Traffic Curb", per linear foot
"Type A Block Traffic Curb", per Imear foot
"Type C Block Traffic Curb", per linear foot
Section 8-11, Guardrail
August 5, 2013
8-11.2 Materials
The following material reference is deleted from this section
Weathering Steel Beam Guardrail 9-16 8
8-11.3(1)B Erection of Rail
The last sentence in the first paragraph is revised to read
All holes shall be painted with two coats of paint conforming to Section 9-08 1(2)B
The fourth paragraph is revised to read
Galvanized steel rad plates shall be fastened to the posts with galvarnzed bolts, washers, and
nuts of the size and kind shown in the Plans
The last paragraph is deleted
8-11.3(1)D Removing Guardrail and Guardrail Anchor
The first finro sentences in the first paragraph are revised to read
Removal of the various types of guardrail shall include removal of the rail, cable elements,
hardware, and posts, including transition sections, expans�on sections, terminal sections and
the rad element of anchor assemblies Removal of the various types of guardrail anchors shall
include removal of the anchor assembly, mcluding concrete bases, rebar, steel tubes, and any
other appurtenances in the anchor assembly
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Rev�sed 8/27/13
��
�
,
�
'
'
�
'
L'
r ---
J
1
i
�
�
,
�
,
�
�
Page 40
'
�
'
'
�
�
,
,
8-11.4 Measurement
The seventh paragraph is revised to read
Measurement of removal of guardrail wdl be by the linear foot measured along the line of
guardrail removed including transition sections, expansion sections, guardrail anchor rad
elements and terminal sections
8-11.5 Payment
The bid item "Weathering St Beam Guardrad Type
", per hnear foot is deleted
The second paragraph is revised to read
The urnt Contract price per linear foot for "Beam Guardrad Type ", "Beam Guardrad Type
1- Ft Long Post", and "Beam Guardrad Type 31- Ft Long Post", shall be full
payment for all costs to obtain and provide materials and perform the Work as described in
Sections 8-11 3(1)A and 8-11 3(1)B, including costs for additional rad elements when nested
rad is required, and when connections to concrete masonry Structures are required
The paragraph followmg the bid item "Removing Guardrad Anchor", per each is revised to read
The unit Contract price per each for "Removing Guardrad Anchor" shall be full payment for all
r costs to perForm the Work as described in Section 8-11 3(1)D, including rad removal, if there
isn't a Bid Item for Removing Guardrad in the run of guardrail connecting to the anchor
C�
a
'
Section 8-12, Chain Link Fence and Wire Fence
April 2, 2012
In this Section "Enginee�" is revised to read "Pro�ect Engineer"
8-12.2 Materials
This section is supplemented with the following
Paint 9-081(2)B
�
1
�
'
'
�
�
8-12.3(1)A Posts
The words "for Type 3 and Type 4 fences" and "on Type 3 and Type 4 fences" are deleted from this
section
The first sentence of the fifth paragraph is revised to read
After the post is set and plumbed, the hole shall be fdled with Grout Type 4
The third sentence in the sixth paragraph is replaced with the following two sentences
After the post is set and plumbed, the hole in the portion of the post �n solid rock shall be filled
with Grout Type 4 The grout shall be thoroughly worked into the hole so as to leave no voids
The seventh paragraph is deleted
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 41
' Rewsed 8/27/13
The ninth paragraph is revised to read
Steep slopes or abrupt topography may require changes m various elements of the fence It
shall be the responsibility of the Contractor to provide all posts of sufficient length to
accommodate the chain link fabric
The tenth paragraph is revised to read
All round posts shall have approved top caps fastened securely to the posts The base of the
top cap fitting for round posts shall feature an apron around the outside of the posts
8-12.3(1)B Top Raii
This section's content including title is deleted and replaced with
8-12.3(1)B Vacant
8 Tension Wire and Tension Cable
This section's content includmg title is revised to read
8-12.3(1)C Tension Wire
Tension Wires shall be attached to the posts as detaded in the Plans or as approved by the
Engineer
8-12.3(1)D Chain Link Fabric
The first three paragraphs are rev�sed to read
Chain link fabric shall be attached after the cables and wires have been properly tensioned
Chain link fabric shall be placed on the face of the post away from the Highway, except on
horizontal curves where it shall be placed on the face on the outside of the curve unless
otherwise directed by the Pro�ect Engineer
Cham link fabric shall be placed approximately 1-mch above the ground and on a straight
grade befinreen posts by excavating high points of ground Fdling of depressions will be
permitted only upon approval of the Pro�ect Engmeer
The fourth sentence in the fourth paragraph is revised to read
The top and bottom edge of the fabric shall be fastened with hog rings to the top and bottom
tension wires as may be applicable, spaced at 24-inch intervals
8-12.3(1)E Chain Link Gates
The third paragraph is deleted
8-12.3(2)A Posts
In the second paragraph, "commercial" is deleted
The first sentence of the fifth paragraph is revised to read
After the post is set and plumbed, the hole shall be fdled with Grout Type 4
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 42
Rewsed 8/27/13
'
'
�
'
,
'
�
r
�
The fourth sentence in the sixth paragraph is replaced with the following two sentences
After the post is set and plumbed, the hole in the portion of the post in solid rock shall be filled
with Grout Type 4 The grout shall be thoroughly worked into the hole so as to leave no voids
The tenth paragraph is revised to read
Where the new fence �oins an existmg fence, the 2 shall be attached in a manner satisfactory
to the Pro�ect Engineer, and end or corner posts shall be set as necessary
The eleventh paragraph is deleted
8-12.5 Payment
The paragraph following the item "Chain Link Fence Type ", per linear foot is revised to read
The unit Contract price per linear foot for "Chain Link Fence Type " shall be full payment
for all costs for the specified Work includmg brace post installation and all other requirements
of Sect�on 8-12 for Chain Lmk Fence, unless covered in a separate Bid Item in this Section
The following paragraph is inserted after the item "End, Gate, Corner, and Pull Post for Cham Link
Fence", per each
The unit Contract pnce per each for "End, Gate, Corner, and Pull Post for Chain Lmk Fence"
shall be full payment for all costs for the specified Work
The following paragraph is inserted after the item "Single 6 Ft Chain Link Gate", per each
, The unit Contract pnce
Link Gate", and "Single
specified Work
per each for "Double 14 Ft Chain Link Gate", "Double 20 Ft Chain
6 Ft Chain Link Gate", shall be full payment for all costs for the
� The paragraph following the item "Wire Fence Type ", per linear foot is revised to read
'
'
C
�;
��
,
,
,
The unit Contract pnce per each for "Wire Fence Type " shall be full payment for all costs
for the specified Work including payment for cleanng of the fence line
The followmg paragraph is inserted after the item "Double Wire Gate 20 Ft Wide", per each
The unit contract pnce per each for "Single Wire Gate 14 Ft Wide" and "Double Wire Gate 20
Ft Wide" shall be full payment for all costs for the specified Work
The paragraph following the item "Access Control Gate", per each is revised to read
The unit contract price per each for "Access Control Gate" shall be full payment for all costs to
perform the specified Work
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 43
' Rev�sed 8/27/13
Section 8-15, Riprap
April 2, 2012
8-15.1 Description
The second paragraph is revised to read
Riprap wdl be classified as heavy loose riprap, light loose riprap, and hand placed riprap
Section 8-20, Illumination, Traffic Signal Systems, And Electrical
August 5, 2013
8-20.3(4) Foundations
The first paragraph is revised to read
Foundation concrete shall conform to the requirements for the specified class, be cast-in-place
concrete and be constructed in accordance with Sections 6-02 2 and 6-02`=3 Concrete for
Type II, III, IV, V, and CCTV signal standards and light standard foundations shall be Class
4000P Concrete for pedestals and cabinets, Type PPB, PS, I, FB, and RM signal standards
and other foundations shall be Class 3000 Concrete placed into an excavation where water is
present shall be placed usmg an approved tremie If water is not present, the concrete shall be
placed such that the free-fall is vertical down the center of the shaft without hittmg the sides,
the steel reinforcing bars, or the steel remforang bar cage bracing The Section 6-02 3(6)
restriction for 5-feet maximum free-fall shall not apply to placement of Class 4000P concrete
mto a shaft Steel remforcing bars for foundations shall conform to Section 9-07
8-20.3(5) Conduit
This sections content is deleted and replaced with the followmg new sub-sections
8-20.3(5)A General
The ends of all conduit,
edges Field cuts shall
capped When conduit
provided with approved
bells
metallic and nonmetallic, shall be reamed to remove burrs and rough
be made square and true The ends of unused conduits shall be �
caps are removed, the threaded ends of inetal condwt shall be
conduit bushings and non-metal conduit shall be provided with end
Reducing couplings wdl not be permitted
Existing conduit in place scheduled for installation of new conductor(s) shall first have any
existmg conductor(s) removed and a cleaning mandrel shall be pulled through The existing
conduit shall then be prepared subJect to the same requirements outlined m this paragraph, for
new conduit and innerduct, unless otherwise indicated in the plans All new conduit and all
innerduct shall be blown clean with compressed air Then in the presence of�the Engineer, an
80 percent sizing mandrel, correctly sized for the raceway, shall be pulled through to ensure
that the raceway has not been deformed This shall be done prior to pulling wire or fiber optic
cable and after fmal assembly is m place Existing conductor(s) shall be reinstalled unless
otherwise indicated in the Plans
As soon as the sizing mandrel has been pulled through innerduct, a 200-Ib mirnmum tensde
strength pull strmg shall be installed and attached to duct plugs at both ends When conduit is
installed for future use, as soon as the bushing or end bell has been mstalled and the sizing
mandrel has been pulled through, the ground wire shall be installed and both ends shall be
capped
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Revised 8/27/13
�
�
C �
�,
�
�
�
Page 44
1
�
�
'
'
'
�
�
8-20.3(5)A1 Fiber Optic Conduit
Where conduit to contain fiber optic cable or conduit identified to contain future fiber optic
cable is installed by open trenching, Detectable Underground Warning Tape shall be
placed 12-inches above the conduit unless othenNise detaded in the Plans Detectable
Underground Warning Tape shall extend 2-feet into boxes or vaults Splicing of the tape
shall be in accordance with tape manufacturer's recommended materials and procedures
Location Wire shall be installed with all nonmetallic conduit that contains fiber optic cable
and all conduits identified to contain future fiber optic cable When open trenching is used,
the location wire shall be placed in continuous lengths directly above the conduit Where
conduit is installed by other methods, the Location Wire shall be attached to the outside of
the conduit with electncal tape placed at minimum 18-inch intervals Location Wire shall
extend 12-feet into boxes or vaults Splices shall be crimped usmg a non-insulated butt
splice, soldered and covered with moisture-blocking heat shrink
8-20 3(5)A2 ITS and Cabinet Outer and Inner Duct Conduit
ITS conduit and both ends of conduit runs entering cabinets, with the exception of the '/Z
inch grounding conduit, shall be sealed with self expanding water proof foam or
mechanical plugs, unless otherwise required At other locations conduit shall be sealed
with Duct Seal
, Outer-duct conduit with non factory assembled innerduct shall be sealed around the
innerduct with self-expanding waterproof foam Outer-duct conduit with factory assembled
innerduct shall be sealed around the innerduct with a multiplex expansion plug Innerduct
' containmg one cable shall be plugged using an expandable split plug Innerduct with
multiple cables shall be sealed with self-expanding waterproof foam Duct plugs shall be
mstalled in all unused inner-ducts (those that are specified as empty) at the time of
conduit installation Duct plugs shall be installed in all used inner-ducts (as specified in
' the Plans), at the time of conduit installation, unless cable pulling for those inner-ducts will
commence within 48-hours Installation shall conform to the manufacturer's
recommendations
,
Foam sealant shall be installed with the following additional requirements
1 Penetration of the sealant into the conduit or duct shall be limited using a high
, temperature backer rod material or rag
2 Penetration of the sealant into the conduit shall be limited to 1-inch
3 The foam sealant shall not pro�ect outside the end of the conduit or duct
'
II
,
,
'
LJ
Where open trenching is allowed and conduit with innerduct is installed, a maximum of
1000-feet of contmuous open trench will be allowed unless otherwise approved by the
Engineer
8-20.3(5)B Conduit Type
Conduit shall be PVC, high density polyethylene (HDPE), rigid metal conduit (RMC) or liquid
tight flexible metal depending on the application
Rigid metal conduit (RMC) shall be installed at the following locations
Within radroad right of way
2 All pole risers, except when otherwise required by owning utilities
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 45
' Revised 8/27/13
3 All surFace-mounted conduit, with the exception of electrical service utility poles
4 All runs within slip form placed concrete
Service late�al runs shall be Schedule 80 PVC except when otherwise required by owning
utdities Conduit mstalled using the plowmg method, shall be schedule 80 high-density
polyethylene (HDPE)
Conduit runs, includmg outer-duct, that enter the traveled way or shoulders, shall be Schedule
80 high-density polyethylene (HDPE), Schedule 80 PVC, or rigid metal conduit (RMC)
Conduit runs, mcludmg outer-duct, which do not enter the traveled way or shoulders, shall be
Schedule 80 high-density polyethylene (HDPE), Schedule 40 PVC or rigid metai conduit
(RMC)
Liquid tight flexible metal conduit is allowed only at locations called for in the Plans
Except as described under Non-Metallic Conduit, unless otherwise indicated m the Plans or
Standard Plans, the same type of conduit shall be used for the entire length of the run, from
outlet to outlet
Innerduct shall have a smooth wall non ribbed interior surface, with factory pre-lubricated
coating
Innerduct withm the Traveled Way or Shoulders and innerduct which is not factory mstalled
shall be schedule 40 high-density polyethylene (HDPE) The innerduct shall be continuous
with no splices Innerduct which is pulled into the outer duct in the field shall be installed with
an extra 2 feet of conduit beyond each end of the outer-duct and shall be aliowed to finish
contracting for 21 calendar days before it is termmated Innerduct shall be terminated with end
bells flush to '/ inch out of the outer-duct and the space between the outer-duct and innerduct
shall be sealed with rodent and moisture resistant foam designed for this application and
installed in accordance with the manufacturer's recommendations
8-20 3(5)B1 Regid Metal Conduet
Slip Joints or runrnng threads will not be permitted for coupimg metallic conduit, however,
runrnng threads will be permitted m traffic signal head spiders and rigid metal conduit
(RMC) outer-duct When installing rigid metal conduit (RMC), if a standard coupling
cannot be used, an approved three-piece coupling shall be used Conduit bodies, fittings
and couplings for rigid metal conduit (RMC) shall be cleaned first and then painted with
one coat of paint conforming to Section 9-08 1(2)B The pamt shall have a minimum wet
film thickness of 3-mils The painted coating shall cover the entire coupling or fitting The
threads on all metal conduit shall be rust-free, clean, and painted with colloidal copper
suspended in a petroleum vehicle before couplings are made All metallic couplings shall
be tightened so that a good electrical connection wdl be made throughout the entire
length of the conduit run If the conduit has been moved after assembly, it shall be given a
final tightening from the ends prior to backfilling
Rigid metal conduit (RMC) ends shall be terminated with grounded end bushings Rigid
metal conduit (RMC) entering cable vaults or pull boxes shall extend 2-inches beyond the
inside wall face (for the installation of grounded end bushing and bonding )
Rigid metal conduit (RMC) entermg concrete shall be wrapped in 2-inch-wide pipe wrap
tape with a mmimum 1-inch overlap for 12-inches on each side of the concrete face Pipe
wrap tape shall be installed in accordance with the manufacturer's recommendations
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 46
Rewsed 8/27/13
�
'
�
'
�
,
Rigid metal conduit (RMC) bends shall have a radius consistent with the requirements of
Code Article 344 24 and other articles of the Code Where factory bends are not used,
conduit shall be bent, using an approved conduit bending tool employing correctly sized
dies, without crimping or flattening, using the longest radius practicable
Where the coating or
such damaged areas
08 1(2)B
galvanized conduit has been damaged in handling or installing,
shall be thoroughly painted with paint conforming to Section 9-
Metal conduit ends shall be threaded and protected with a snug f�tting plastic cap that
covers the threads untd wiring is started
8-20.3(5)B2 Non-Metallic Conduit
Where non-metallic conduit is installed, care shall be used in excavating, instaliing, and
backfilling, so that no rocks, wood, or other foreign material wdl be left in a position to
cause possible damage
PVC conduit ends shall be terminated with end bell bushings PVC or HDPE conduit
' entering cable vaults and pull boxes shall terminate with the end bell flush with the inside
walls of the Structure
,
'
,
�
Non-metallic conduit bends, where allowed, shall conform to Article 352 24 of the Code
Eighteen-inch radius elbows shall be used for PVC conduit of 2-inch nominal diameter or
less Standard sweep elbows shall be used for PVC conduit with greater than 2-inch
nominal diameter unless otherwise specified in the Plans In nonmetallic conduit less than
2-mch nominal diameter, pull ropes or flat tapes for wire installation shall be not less than
%4-inch diameter or width In nonmetallic conduit of 2-inch nominal diameter or larger, pull
ropes or flat tapes for wire installation shall be not less than '/rmch diameter or width
When HDPE conduit is used for directional bormg, it shall be continuous, with no �oints,
for the full length of the bore The conduit run shall be extended to the associated outlets
with the same schedule HDPE or PVC conduit Entry mto associated �unction box outlets
shall be with the same schedule PVC conduit and elbows The same requirements apply
for extension of an existing HDPE conduit crossing
� PVC conduit and elbows shall be connected to HDPE conduit with an approved
mecharncal coupling The connection shall have minimum pullout strength of 700-pounds
Prior to installation of a mechanical coupling, the HDPE conduit shall first be prepared
' with a clean, straight edge A water-based pulling lubncant may be applied to the
threaded end of the mechanical coupling before installation Solvent cement or epoxy
shall not be used on the threaded �oint when connecting the HDPE conduit to the
mechanical coupling The mecharncal coupling shall be rotated until the HDPE conduit
� seats approximately �/4 of the distance mto the threaded coupling depth
For PVC mstallation through a directional bore, the PVC shall be in rigid sections
� assembled to form a watertight bell and spigot-type mechanical �oint with a solid retaming
ring around the entire circumference of the conduit installed in accordance with the
manufacturer's recommendations The conduit run shall be extended beyond the length
' of the bore, to the associated outlets with the same mechanical coupled PVC or with
standard PVC condwt of the same schedule The same requirements apply for extension
of an existing PVC conduit Roadway crossmg
'
�'!
�
PVC conduit shall be assembled using the solvent cement specified in Section 9-29 1
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 47
' Rev�sed 8/27h3 .
Conduit ends shall be protected with a snug fitting plastic cap untd wirmg is started
Conduit caps, end bells and the section of PVC befinreen the coupling and end bell
bushing in cabinet foundations shall be mstalled without glue
8-20.3(5)C Conduit Size
The size of conduit used shall be as shown m the Plans Conduits smaller than 1-inch
electrical trade size shall not be used unless otherwise specified, except that grounding
conductors at service points may be enclosed in'/rinch-diameter conduit
Conduit befinreen light standards, PPB, PS, or Type 1 poles and the nearest �unction box shall
be the diameter specified in the Plans Larger size conduit is not allowed at these locations At
other locations it shall be the option of the Contractor, at no expense to the Contracting
Agency, to use larger size conduit if desired, provided that �unction box or vault capacity is not
exceeded Where larger size conduit is used, it shall be for the entire length of the run from
outlet to outlet _
Conduit runs with innerduct, shall have 4-inch outer-duct and shall be mstalled with four 1-inch
mnerduct unless otherwise indicated in the plans
8-20.3(5)D Conduit Placement
Conduit shall be laid so that the top of the conduit is a minimum depth of
24-inches below the bottom of curb in the sidewalk area
2
3
4
5
24-mches below the top of the roadway base
48-inches below the bottom of ties under railroad tracks unless otherwise specified
by the railroad company
36-inches below firnsh grade when mstalled usmg conduit plowing method
24-inches below the finish grade m all other areas
Conduit entenng through the bottom of a �unction box shall be located near the end walls to
leave the ma�or portion of the box clear At all outlets, conduit shall enter from the direction of
the run, terminating 6 to 8-inches below the �unction box lid and within 3-inches of the box wall
nearest its entry location
Conduit runs shown in the Plans are for Biddmg purposes only and may be relocated with
approval of the Engineer, to avoid obstructions
8-20.3(5)D1 Surface Mounting
Where surface mounting of conduit is reqwred, supports shall consist of channel with clamps
sized for the conduit Support spacing shall comply with the Code, with the exception that
spacing of channel supports for conduit shall not exceed 5-feet
The minimum distance befinreen ad�acent clamps and between the clamp and the end of the
channel supports shall be 1-inch Channel supports shall be installed with stops, to prevent
clamps from slidmg out of the ends
AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Page 48
Rewsed 8/27113
�
�
�-,
'
'
'
'
'
'
'
'
'
�
�
'
'
,
�
8-20.3(5)D2 Structures
All conduits attached to or routed withm bridges, retairnng walls, and other structures shall be
equipped with approved expansion, deflection, and/or combination expansion/deflection
fittings at all expansion �oints and at all other �omts where structure movement is anticipated,
including locations where the Contractor, due to construction method, installs expansion
and/or construction �oints with movement All conduit fittings shall have movement capacity
appropriate for the anticipated movement of the Structure at the �oint Approved deflection
fittings shall also be installed at the �oint befinreen the bridge end and the retaining wall end,
and the transition from bridge, wall, or other structure to the underground section of conduit
pipe
8-20.3(5)E Method of Condu�t Installation
Conduit shall be placed under existing pavement by approved directional bormg, �acking, or
drdling methods at locations approved by the Engineer The pavement shall not be disturbed
unless allowed in the Plans or with the approval of the Engineer in the event obstructions or
impenetrable soils are encountered High density polyethylene (HDPE) conduit runs, which
enter the traveled way or shoulders, shall be mstalled using the directional boring method
8-20.3(5)E1 Open Trenching
When open trenching is allowed, trench construction shall conform to the following
The pavement shall be saw-cut a minimum of 3-inches deep The cuts shall be
parallel to each other and extend 2-feet beyond the edge of the trench
2 Pavement shall be removed in an approved manner
3 Trench depth shall provide a minimum cover for conduit of 24-mches below the
top of the roadway base
4 Trench width shall be 8-inches or the conduit diameter plus 2-inches, whichever
is larger
5 Trenches located within paved Roadway areas shall be backfilled with
Controlled density fill (CDF) meeting the requirements of Section 2-09 3(1)E
The controlled density fill shall be placed level to, and at the bottom of, the
existing pavement The pavement shall be replaced with pavmg material that
matches the existing pavement
6 On new construction, conduit shall be placed prior to placement of base course
pavement
8-20 3(5)E2 Conduit Plowing
All conduit plowing shall be supervised by a licensed electrical Contractor
The starting point shall be anchored or held such that conduit movement at the start of
the plowing operation is kept to a minimum The conduit reel shall be mounted on the
vehicle such that conduit movement is kept to a mmimum once it is in the ground Use of
a stationary reel is not allowed The feed shoe shall have rollers which conform to the
conduit at a radius of not less than 15 times the diameter of the conduit The conduit will
not be permitted to pass over stationary guides nor over rollers or sheaves, which wdl
permit a bend radius of less than 15 times conduit diameter The width of the tooth and
feed shoe shall not exceed the conduit diameter by more than 2-mches
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 49
, Revised 8/27/13
The conduit shall be installed using a continuous reel, with no �oints, for the full length of
the conduit run, unless conduit splicing is allowed as indicated below
If an obstruction is encountered that cannot be plowed through, the following remedies
shall be attempted in order
Contractor shall stop the plowmg operation and attempt to remove the
obstruction If the obstruction is removed, plowing operations shall continue
along the approved path
2 Deviations of up to one foot from the pro�ected path may be authorized by the
Engineer, provided the new route does not result in total conduit run bends
exceedmg NEC requirements Deviations in excess of one foot from the
pro�ected path are not allowed and the maximum taper rate is 1-inch per linear
foot of conduit
3 The Contractor may request approval to intercept the mstalled conduit and route
another section of HDPE to avoid the obstruction, provided the new route does
not result m total conduit run bends exceeding NEC requirements Connection
between the sections shall be accomplished using an approved fusion splicing
method, which is compatible with the conduit manufacturer's recommendations
4 Where none of the above remedies are successful, all conduit installed so far m
that run shall be removed and a new plow path established to avoid the
obstruction
In the event of a breakage, all conduit installed in that run shall be removed
The conduit run shall be extended to the associated outlets, sub�ect to the same
requirements indicated when HDPE is installed using the directional boring method
The depth of installation shall be continually ad�usted as necessary to compensate for
changes in terrain
Plowed conduit shall be laid so that the top of the conduit is a minimum depth of 36-
inches below the finish grade with the exception that the conduit shall be swept up to
enter the knock outs of associated pull boxes or cable vaults
The plow placing the conduit shall be marked at a proper distance above the plow's
conduit exit pomt to indicate when the minimum installation depth is not met The mark
shall be visible from a safe distance from the plowmg operation when it is exposed above
ground Whde plowing this mark must remain below ground level at all times, with the
exception of the entry and exit points at the end of the run, in order to ensure that
mmimum burial depth of the conduit is achieved
If the depth mark on the plow comes above ground, the Contractor shall stop the plowing
operation and attempt to correct the placement depth If the conduit depth can be verified
to meet the minimum burial requirements at the location where the depth mark came
above ground, the plowing operation shall resume sub�ect to the Engineers approval
The compacted surface shall be firm, non-yielding, and result in a finished surface that
matches the lines and grades of the terrain prior to plowing
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 50
Revised 8/27/13
'
' 8-20.3(5)E3 Bormg
Bore pits shall be backfilled and compacted m accordance with Section 2-09 3(1)E
Directional bonng, Jackmg or drdling pits shall be a minimum of 2-feet from the edge of
' any type of pavement, unless otherwise approved by the engineer Excessive use of
water that might undermme the pavement or soften the Subgrade wiil not be permitted
When approved by the Engineer, small test holes may be cut in the pavement to locate
, obstructions When the Contractor encounters obstructions or is unable to install conduit
because of sod conditions, as determined by the Engineer, additional Work to place the
conduit wdl be paid in accordance with Section 1-04 4
�
�
�
�
'
'
'
'
8-20.3(5)E4 Directional Boring
Directional boring for electrical installations shall be supervised by a licensed electrical
contractor in accordance with Section 8-20 1(1) Where directional boring is called for,
conduit shall be mstalled usmg a surFace-launched, steerable drilling tool Drilling shall be
accomplished using a high-pressure fluid �et tool-head The drilling fluid shall be used to
maintain the stabdity of the tunnel, reduce drag on the conduit, and provide backfill
befinreen the conduit and tunnel A guidance system that measures the depth, lateral
position, and roll shall be used to guide the tool-head when creating the pdot hole Once
the pdot hole is established, a reamer and swivel shall be used to mstall the conduit
Reaming diameter shall not exceed 1 5 times the diameter of the conduits being installed
Conduit that is being pulled mto the bonng shall be installed in such a manner that the
conduit is not damaged during mstallation The pu(Iback force on the conduit shall be
controlled to prevent damage to the conduit A vacuum spods extraction system shall be
used to remove any excess spods generated during the installation Excess dnlling fluid
and spods shall be disposed of The method and location used for disposal of excess
drdling fluid and spods shall be sub�ect to the Engineer's approval Drilling fluid returns
(caused by fracturing of formations) at locations other than the entry and exit points shall
be minimized Any drilling fluid that surfaces through fracturing shall be cleaned up
immediately Mobde spods-removal equipment capable of quickly remov�ng spods from
entry or exit pits and areas with returns caused by fracturing shall be used as necessary
durmg drdling operations
, 8-20 3(5)E5 Boring with Casing
Where bormg with casing is called for, the casing shall be placed usmg an auger inside
the casing to remove the soil as the casmg is �acked forward The auger head shall
' proceed no more than 4-�nches ahead of the p�pe being �acked Bormg operations shall
be conducted to prevent caving ahead of the pipe �nstalled casing pipe shall be free from
grease, dirt, rust, moisture, and any other deleterious contaminants
'
�
'
LI
'
The space between the conduit and casing shall be plugged with sandbags and a grout
seal 12-inches thick at each end of the casing Casing abandoned due to an encountered
obstruction shall be grout sealed in the same manner Grout shall conform to Section 9-
20 3(4)
In lieu of sandbags and grout, unopened prepackaged concrete and grout may be used to
seal the casing
Material shall not be removed from the bormg pit by washing or sluicmg
All �oints shall be welded by a Washmgton State certified welder Welding shall conform to
AWS D 1 1-80 Structural Weldmg Code, Section 3, Workmanship
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 51
, Revised 8/27/13
�
8-20.3(8) Wiring
The fifteenth through seventeenth paragraphs are revised to read
When conductors, either cable or single, are being installed, the Contractor shall not exceed
the tension limitations recommended by the manufacturer Conductors may be pulled directly
by hand, or with mechanical assistance If conductors are pulled by any mecharncal means, a
dynamometer with drop-needle hand shall be used on every mecharncaUy ass�sted pull
On mechanically assisted pulls, insulation shall be stnpped off the individual conductor and the
conductor formed into a pulimg eye and firmly attached to the pulling rope/tape, or a cable grip
shail be used The Contractor shalf determine the maximum allowable pulling tension, taking
into account the direction of the pull, type of raceway, cable geometry, weight of the cable, the
coefficient of friction, and side wall pressure, using the information from the cable
manufacturer If there are bends in the raceway or sheaves are used for the cable pull, the
Contractor shall use the cable manufacture's side wall pressure limits to determine the
maximum pullmg tension The maximum pulling force applied directly to the conductor when
pulling eyes are used or when the conductor is formed into a loop, shall be limited to that
shown m the followmg table for copper conductor When a cable grip is applied over
nonmetallic sheathed cables, the maximum pulling force shall be limited to 1,000-pounds
provided this is not m excess of the force as determined above
Conductor Pounds
8 132
6 210
4 334
3 421
2 531
1 669
1 /0 845
2/0 1, 065
3/0 1, 342
4/0 1,693
250Kcmil 2,000
500Kcmil 4,000
'
,
�J
,
�
,
�
��
II �
�
�
8
1
Adequate lubrication of the proper type to reduce friction in conduit and duct pulls shall be '
utdized The grease and oil-type lubncants used on lead sheathed cables shall not be used on
nonmetallic sheathed cables
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Rev�sed 8/27/13
t
�
�
Page 52
'
'
'
'
'
,
�
�
'
'
�
�
'
'
8-20.3(9) Bonding, Grounding
The first sentence in the second paragraph is replaced with the following finro sentences
All conduit installed shall have an equipment ground conductor installed in addition to the
conductors noted m the Contract Conduit with innerducts shall have an equipment ground
conductor installed m each innerduct that has an electrical conductor
Section 8-21, Permanent Signing
January 7, 2013
8-21 2 Materials
The third sentence is revised to read
Matenals for sign mounting shall conform to Section 9-28 11
8-21.3(9)A Fabrication of Steel Structures
The first sentence in the first paragraph is revised to read
Fabrication shall conform to the applicable requirements of Section 6-03 and 9-06
This section is supplemented with the following
All fabrication, including repairs, ad�ustments or modifications of previously fabricated sign
structure members and connection elements, shall be performed in the shop, under an
Engineer approved shop drawing prepared and submitted by the Contractor for the original
fabrication or the specific repair, ad�ustment or modification Sign structure fabrication repair,
ad�ustment or modification of any kmd in the field is not permitted if fabrication repair,
ad�ustment or modification occurs after a sign structure member or connection element has
been galvanized, the entire member or element shall be re-galvanized in accordance with
AASHTO M 111
8-21.3(9)B Vacant
This section including title is revised to read
8-21.3(9)B Erection of Steel Structures
Erection shall conform to the applicable requirements of Sections 6-03 and 8-21 3(9)F
Section 8-21 3(9)F notwithstanding, the Contractor may erect a sign bridge prior to completion
of the shaft cap portion of one foundation for one post provided the following conditions are
satisfied
' 1 The Contractor shall submit design calculations and working drawings of the
temporary supports and falsework supportmg the sign bridge near the location of the
mcomplete foundation to the Engineer for approval m accordance with Section 6-
' 01 9 The submittal shall include the method of releasing and removmg the
temporary supports and falsework without mducing loads and stress mto the sign
bridge
'
'
�
'
2 The Contractor shall submit the method used to secure the anchor bolt array in
proper position with the sign bridge while casting the shaft cap concrete to complete
the foundation
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 53
' Revised 8/27/13
L�
3 The Contractor shall erect the sign bridge and temporary supports and falsework,
complete the remaining portion of the incomplete foundation, and remove the
temporary supports and falsework, m accordance with the workmg drawing
submittals as approved by the Engineer
8-21.3(9)F Foundations
The following new paragraph is inserted after the second paragraph
Concrete placed into an excavat�on where water is present sha11 be placed using an approved
tremie If water is not present, the concrete shall be placed such that the free-fall is vertical
down the center of the shaft without hittmg the sides, the steel reinforcing bars, or the steel
remforcing bar cage bracing The Section 6-02 3(6) restriction for 5-feet maximum free-fall
shall not apply to placement of Class 4000P concrete into a shaft
The ninth paragraph (afte� implementing the precedmg Amendment) is replaced with the following
three new paragraphs -
After construction of concrete foundations for sign bridge and cantdever sign structures, the
Contractor shall survey the foundation locations and elevations, the anchor bolt array locations
and lengths of exposed threads The Contractor shall confirm that the survey conforms to the
sign structure post, beam, span and foundation design geometry shown in the Plans, and shall
identify any deviations from the design geometry shown in the Plans When deviations are
identified, the Contractor shall notify the Engineer, and such notice shall be accompanied by
the Contractor's proposed method(s) of addressmg the deviations, mcluding removal and
reconstruction of the shaft cap portion of the affected concrete foundation as outlined in this
Section, or fabrication repair, ad�ustment or modification, with associated shop drawings, m
accordance with Section 8-21 3(9)A
If the Contractor's survey indicates that a concrete foundation has been constructed
incorrectly for a sign structure that has already been fabncated, the Contractor may remove
and reconstruct the shaft cap portion of the foundation, in accordance with Section 1-07 13,
provided the following conditions are satisfied
The Contractor shall submit the method and equipment to be used to remove the
portion of the concrete foundation to be removed and reconstructed to the Engineer
for approval in accordance with Section 1-05 3 The submittal shall include
confirmation that the equipment and the method of operation is appropriate to ensure
that the existing anchor bolt array and primary shaft vertical steel reinforcing bars will
not be damaged
2 All steel reinforcing bars, except for steel reinforcing bars extending from the bottom
portion of the foundation to remain, shall be removed and disposed of in accordance
with Sections 2-02 3 and 2-03 3(?)C, and shall be replaced with new steel reinforcing
bars conforming to the size, dimensions and geometry shown in the Plans All
concrete of the removed portion of the foundation shall be removed and disposed of
in accordance with Sections 2-02 3 and 2-03 3(7)C
3 The Contractor shall ad�ust the pnmary shaft vertical steel reinforcing bars as
necessary m accordance with Section 6-02 3(24)C to provide clearance for the
anchor bolt array
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Revised 8/27/13
,
L� 1
�
�J
L�
'
��
�
C l
e
��
'
�
C�'
,
'
,
�
Page 54
,
CJ
LJ
'
�
,
'
Sign structures shall not be erected on concrete foundations untd the Contractor confirms that
the foundations and the fabricated sign structures are either compatible with each other and
the design geometry shown m the Plans, or have been modified in accordance with this
Section and as approved by the Engineer to be compatible with each other, and the
foundations have attained a compressive strength of 2,400-psi
Item number 4 in the finrelfth paragraph (after implemented the preceding Amendments) is revised
to read
4 Concrete shall be Class 4000P, except as otherwise specified The concrete for the shaft
cap (the portion contairnng the anchor bolt array assemblies above the construction �oint
at the top of the shaft) shall be Class 4000
Item number 3 m the thirteenth paragraph (after implemented the preceding Amendments) is
revised to read
3 Unless otherwise shown in the Plans, concrete shall be Class 4000P
,
8-21.5 Payment
This section is supplemented with the following
' All costs in connection with surveying completed concrete foundations for sign bridges and
cantdever sign structures shall be included m the lump sum contract price for "Structure
Surveying", except that when no Bid item is included in the Proposal for "Structure Surveying"
' then such costs shall be included in the lump sum contract price(s) for "Sign Bridge No .- "
and "Cantdever Sign Structure No _"
,
'
'
�
Section 8-22, Pavement Marking
January 7, 2013
8 Line Applications
The last paragraph is supplemented with the following
Grooved line pavement marking shall not be constructed on bndge decks or on bndge
approach slabs
8 Removal of Pavement Markings
The followmg two new sentences are mserted after the first sentence
, Grinding to remove painted markings is not allowed Gnnding to remove plastic marking is
allowed to a depth �ust above the pavement surface, then water blasting or shot blasting shall
be required to remove the remaining markings
LJ!
r
8-22.4 Measurement
The items "Painted Wide Line" and "Plastic Wide Line" are deleted from the fourth paragraph
The sixth paragraph is revised to read
Diagonal lines used to delineate parkmg stalls that are constructed of painted or plastic 4-mch
' lines will be measured as "Paint Line" or "Plastic Line" by the linear foot of line mstalled
Crosswalk line wdl be measured by the square foot of marking installed
,
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 55
, Revised 8/27N3
The following two new paragraphs are inserted after the sixth paragraph
Crosshatch markings used to delineate median and gore areas will be measured by the
completed linear foot as "Painted Crosshatch Marking" or "Plastic Crosshatch Markmg"
The measurement for "Painted Crosshatch Markmg" and for "Plastic Crosshatch Marking" will
be based on the total length of each 8-inch or 12-inch wide line installed
8-22.5 Payment
The bid items "Painted Wide Line", per linear foot and "Plastic Wide Lme", per linear foot are
deleted from this section
This section is supplemented with the following two new bid items
"Pamted Crosshatch Marking", per linear foot
"Plastic Crosshatch Marking", per linear foot
The following new paragraph is inserted after the last bid item in this section
The urnt Contract price for the aforementioned Bid items shall be full payment for all costs to
perform the Work as described in Section 8-22
Section 8-25, Glare Screen
April 9, 2012
In this section, "tension cable" and "cable" are deleted
8-25.3(3) Posts
The first sentence in the first paragraph is revised to read
Posts shall be constructed in accordance with the Standard Plans and applicable provisions of
Section 8-12 3(1)A
The last paragraph is revised to read
All round posts for Type 1 Design B and Type 2 glare screen shall be fitted with a watertight
top securely fastened to the post Line posts shalt have tops designed to carry the top tension
wire
8-25.3(5) Tension Cables
This sections content including title is deleted
8-25.3(6) Fittings, Attachments, and Hardware
This sections content including title is deleted
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 56
Revised 8/27/13
�
�
�
'
'
���
'
�
�
'
�
�
I ��
��
�
�
'
�
L_'
Section 8-29, Wire Mesh Slope Protection
January 7, 2013
This section is deleted in its entirety and replaced with the following
8-29 Wire Mesh Slope Protection
8-29.1 Description
This Work consists of furnishing and installing the anchors and the wire mesh slope protection in
accordance with these Specifications and the detads shown in the Plans and m conformity with the
Imes and dimensions shown in the Plans or established by the Engineer
8-29.2 Materials
Materials shall meet the requirements of Section 9-16 4
8-29.3 Construction Requirements
8-29.3(1) Submittals
The Contractor shall submit a wire mesh slope p�otection plan to the Pro�ect Engineer a
mirnmum of seven calendar days prior to beginning the work The wire mesh slope protection
plan shall include the following
Plan sheets for anchor layout and installation, and the equipment and process used
to confirm the capacity of the constructed anchors mcluding the calibration data for
the stressing devices used to proof test the anchors, as completed by an
independent testing laboratory within 60 calendar days of the wire mesh slope work
2 Workmg drawmgs for the temporary yoke or load frame to be used for anchor proof
testmg in accordance with Section 6-01 9
3 Plans and detads for assembling wire mesh and erectmg the assembled mesh on the
slope
All costs for the Work required for Submittals shall be mcluded in the unit Bid price detaded in
Section 8-29 5
8-29.3(2) Anchors
The Contractor shall install anchors of the type shown in the Plans and in conformance with
the layout shown in the Wire Mesh Protection Plan as described in Section 8-29 3(1) The
spacing and number of the anchors and wire ropes as shown in the Plans are approximate
only, and upon review of the wire mesh slope protection plan, the Engineer may arrange the
spacing to better hold the wire mesh against the slope Backfdl material shall be thoroughly
compacted with a mechanical compactor
The Contractor shall proof test up to 25 percent of the anchors m vertical pullout to the
mmimum allowable anchor capacity specified in the Plans Proof testing of anchors shall be
perFormed against a temporary yoke or load frame No part of the temporary yoke or load
frame shall bear within three feet of the anchor being tested For vertical pullout proof testing,
an anchor is acceptable if it sustains the specified capacity for 10 minutes with no loss of load
Anchors that fail this criterion shall be replaced and retested if more than three anchors fail,
the Contractor shall proof test all anchors
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 57
' Revised 8/27/13
8-29.3(3) �re Rope
All wire rope loops shall include a thimble No wire rope splicing wdl be allowed
8-29.3(4) �re Mesh
The wire mesh shall be fastened to the completed wire rope assembly as shown m the Plans
High tensde steel fasteners on the vertical seams shall be staggered across width of the seam
Horizontal splices �oirnng 2 rolls of inesh shall be made by overlapping the mesh
approximately 3 feet and either weavmg 3 rows of lacing wires through every mesh opernng or
using 4 rows of high tensde steel fasteners placed on approximately 3-inch spacing All top
and bottom laps shall be made by folding the mesh to the outside, away from the slope, to
avoid the possibdity of falling material hanging up in the folds The bottom of the mesh shall be
located as shown in the Plans The ends of all lacmg wires shall be secured to the mesh with a
mmimum of 1'/rturns
The wire mesh shall not be tensioned in any direction, but is to remam loose so as to increase
its dampening_ effect on rolling rocks The Contractor shall use care in the handlmg and
installing of the wire mesh and wire rope Any mesh or wire rope damaged due to the
Contractor's operations shall be replaced by the Contractor at no expense to the Contracting
Agency t,�
8-29.4 Measurement
Measurement of anchors wdl be per each for the completed anchor Anchor types wdl not be
differentiated
Wire mesh slope protection wdl be measured by the square foot of wire mesh erected on the slope
There wdl be no deduction made for overlapping the wire mesh material as required for splices or
for coverage due to variations m the slope or ground conditions
8-29.5 Payment
Payment wdl be made in accordance with Section 1-04 1, for each of the following Bid items that
are included in the Proposal
"Wire Mesh Slope Protection Anchor", per each
The urnt Contract price per each for "V11ire Mesh Slope Protection Anchor" shall be full
payment for all costs for the Work described m Sections &29 3(1) and 8-29 3(2)
"Wire Mesh Slope Protection", per square foot
The unit Contract price per square foot for "Wire Mesh Slope Protection" shall be full payment
for all costs for the Work described in Section 8-29 3(3) and &29 3(4)
Section 9-02, Bituminous Materials
August 5, 2013
In this section, °Asphalt Emulsion" is revised to read "Emulsified Asphalt"
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 58
Rev�sed 8/27/13
'
'
,
'
'
'
,
�
'
�
'
'
'
�
'
'
� _J
'
9-02.1 Asphalt Material, General
In this section, "Cationic Emulsified Asphalt" is revised to read "Emulsified Asphalt"
The first paragraph is revised to read
Asphalt furnished under these Specifications shall not have been distilled at a temperature
high enough to produce flecks of carbonaceous matter, and upon arnval at the Work, shall
show no signs of separation mto lighter and heavier components
9-02.1(6) Cationic Emulsified Asphalt
The "Cationic Emulsified Asphalt Table" is revised to read
Cationic Emuls�fied Asphalt Table
r r �¢� z � � � � '` 3' ° �g �� � ff �`�'a ,. 'w�r �t.� � � �,_ � �— '�
a �r d� a � ,�.� 1�� '� � �' �4& � — �� �Etr 3r* _ ^'° ��' �� �� _�-i�'� ¢ � ��� �,
�L= g � � ��` � � �� � � � �y °� , Rapid SetUng � ;� � � � � , Il�dium �Sett�ng ���� 'n' �Slow Setting , _
;�_ �� �' ��� F- ;� �� :�� ��� � �E >_ f _ � �w� �`� f_ _
` tr _
a ,s'
� � Type,� � � CRS-1 s CRS-2 � CMS-2S CMS-2 ' CMS-2h = CSS-1 CSS-11i
° �� `AASHT�O Test' �r = � ; � � w,,� � � � �� � � � �: z m � ,f � °_�
_ ,, _ ' �, , , e _ , - � , _- � � a� - � � �� �
>�
°; Grade ���� = Methoc! A gr € Mm.�� ' Max Min Max. Min. Max. M�n. RAax. ° Min. 11�ax M�n. Nlax. 11Ain Max
Tests on
Emulsified
Asphalts
Viscosity SFS T 59 20 100 20 100
@ 77°F(25°C)
Viscosity SFS T 59 20 100 150 400 50 450 50 450 50 450
@ 122°F
(50°C)
Storage T 59 1 1 1 1 1 1 1
stabdity
test 1 day %
Demulsibdity
35 ml
0 8% sodwm
dioctyl
sulfosuccinate T 59 40 40
,%
Particle 59 Pos Pos os Pos os osb Posb
charge test
Sieve Test, % 59 10 10 10 10 10 10 10
Cement T 59 2 0 2 0
mixing test, %
Distdlation
Od distdlate
by vol T 59 3 1 5 3 20 12 12
of emulsions
%
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 59
' Revised 8/27/13
Cationic Emulsified Asphalt Table
� s � � ; < r� � , � ' � �� ��E'�� � �'�r�`�d=� � �� � : � �� �° ° � F��� ��� �� �'"s �'d
� �� � � � � ,� �,� � � _�� � � �� _ Rap�d Sett�ng � Medium Setiing i � �` #� �� Siow Settin9, ���
� �=`��� ;��,�;� x� Q�s a �� ' ; ��u �� ��a �- �_� _ �
° '�: _ — ;��7'i � ° ',�S �w �. �� � a °�r�, Z ^�. ° �;xi a r+a � "� r
"� �� �TYPe � � � Ya �CRS-1 �,� � � 3,� CRS-2�s' = CMS-2S CMS-2 CMS-2h CSS=1� �CSS-1h
' s � �AASHTO Test � , � ' _ ` � ° ° , - � � � � ° � �
�- Grade�` E Method � M�n. IVlax fiAm. Max. Mhn. Max. Mm Max. a Min: Max Min. Ma�c. Min M�:
'�«,r�.� � ����� ; �,��� �� �:; � � � � r -= z � ° � � � ° °e �.� � ��
Residue, % T 59 60 65 60 65 65 57 57
Tests on
residue from
distdlation
tests
PenetraUon, T 49 100 250 100 250 100 250 100 250 40 90 100 250 40 90
77°F (25°C)
Ductihty, 77°F
(25°C) T 51 40 40 40 40 40 40 40
5 cMmin , cm
Solubdiiy in
tnchloroethyle T 44 97 5 97 5 97 5 97 5 97 5 97 5 97 5
ne, %
The demulsibdity test shall be made �nnthin 30 days from date of shipment
If the particle charge test for CSS-1 and CSS-1 h is inconclusive, matenal having a maximum pH value of 6 7�nnll be
acceptable
9-02.1(6)A Polymerized Cationic Emulsified Asphalt CRS-2P
The first paragraph (except for the table) is revised to read
CRS-2P shall be a polymerized catiornc emulsified asphalt The polymer shall be milled into
the asphalt or emulsion during the manufacturing of the emulsified asphalt CRS-2P shall meet
the following requirements
Footnote 1 below the table is revised to read
1 Distdlation modified to use 300 grams of emulsified asphalt heated to 350°F ± 9°F and '
mamtained for 20 minutes
9-02.1(8) Flexible Bituminous Pavement Marker Adhesive
The fifth row in the table is revised to read
Ductility, 39 2°F, 1 cm/minute, cm AASHTO T 51 5 Min
9 Anti Additive
This section is revised to read
Anti-stripping additive shall be a product listed in the current WSDOT Qualified Products List
(QPL)
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Rewsed 8/27/13
8
�
�I
'
�
Page 60
'
lJ
'
,
,
'
'
�
'
'
�
'
�J
,
'
,
'
�
�
'
Section 9-03, Aggregates
August 5, 2013
9-03.1(1) General Requirements
The eighth paragraph is deleted
9-03.6 Aggregate for Asphalt Treated Base (ATB)
This section including title is deleted m its entirety and replaced with the following
Vacant
9-03.8(4) Blending Sand
This sections including title is revised to read
Vacant
9-03.13 Backfill for Sand Drains
This section is supplemented with the following
That portion of backfill retained on a No 4 sieve shall not contain more than 0 05 percent by
weight of wood waste
9-03.13(1) Sand Drainage Blanket
The last paragraph is revised to read
That portion of backfill retained on a No 4 sieve shall not contain more than 0 05 percent by
weight of wood waste
9-03 14(1) Gravel Borrow
Note' is deleted, including the reference in the table
9-03.14(2) Select Borrow
Note' is deleted
Note 2 is re-numbered Note', including the reference in the table
AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Page 61
Revised 8/27h3
�
9-03.14(4) Gravel Borrow for Geosynthetic Retaining Wall
This section mcluding title is revised to read
Gravel Borrow for Structural Earth Wall
All backfill material within the reinforced zone for structural earth walls shall consist of granular
material, either naturally occurring or processed, and shall be free draining, free from orgarnc
or otherwise deleterious material The material shall be substantially free of shale or other soft,
poor durability particles, and shall not contain recycled materials, such as glass, shredded
tires, portland cement concrete rubble, or asphaltic concrete rubble The backfill material shall
meet the following requirements for grading and quality
Geosynthehc Metall�c
Reinforcement Reinforcement
S�eve Size Percent Passin Percent Pass�n
4 99-100
2 75-100
1 '/a "' 99-100
1 " 90-100
No 4 50-80 50-80
No 40 30 max 30 max
No 200 7 0 max 7 0 max
Sand E uivalent 50 rrun 50 rrun
All percentages are by weight
Property Test Method Geosynthehc MetaWc
Reinforcement Reinforcement
Re u�rements Re uirements
Los Angeles Wear AASHTO T 96 35 percent max 35 percent max
500 rev
Degradahon Factor WSDOT Test Method T 15 rrun 15 irun
113
Resishvity WSDOT Test Method T 3,000 ohm-cm,
417 rtun
pH WSDOT Test Method 4 5-9 5-10
113
Chlondes AASHTO T 291 100 m max
Sulfates AASHTO T 290 200 m max
If the resistivity of the gravel borrow equals or exceeds 5,000 ohm-cm, the specified chloride
and sulfate limits may be waived
Wall backfill material satisfying these grading and property requirements shall be classified as
nonaggressive
9-03.21(1) General Requirements
The first sentence m the first paragraph is revised to read
Hot Mix Asphalt, Concrete Rubble, Recycled Glass (glass cullet), and Steel Furnace Slag may
be used as, or blended uniformly with naturally occurring materials for aggregates
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Revised 8/27/13
'
'
'
�
�
'
�
�
�
Page 62
'
'
�
'
�
�_
��I
�
'
�
'
,
'
'
1
'
�
'
'
�
9-03.21(1)C Vacant
This section includmg title is revised to read
9-03 21(1)C Recycled Glass (Glass Cullet)
Glass Cullet shall meet the requirements of AASHTO M 318 with the additional reqwrement
that the glass cullet is limited to the maximum amounts set in Section 9-03 21(1)E for recycled
glass Pnor to use the Contractor shall provide certification to the ProJect Engineer that the
recycled glass meets the physical properties and deleterious substances requirements m
AASHTO M-318
9-03.21(1) E Table on Maximum Allowabie Percent (By Weight) of Recycled Material
In the table, the row containing the item "Aggregate for Asphalt Treated Base (ATB)" is deleted
The column heading "Recycled Glass" is revised to read "Recycled Glass (Glass Cullet) in the
table
In the column "Recycled Glass (Glass Cullet)" all amounts are revised to read "20" begmrnng with
the item "Ballast" and continumg down until the last item in the table
Section 9-04, Joint And Crack Sealing Materials
January 7, 2013
9-04.2 Joint Sealants
This section is supplemented with the following new sub-sections
9-04.2(3) Polyurethane Sealant
Polyurethane sea(ant shali conform to ASTM C 920 Type S Grade NS Class 25 Use M
Polyurethane sealant shall be compatible with the closed cell foam backer rod When required,
compatibility characteristics of sealants in contact with backer rods shall be determmed by
Test Method ASTM C 1087
9-04.2(3)A Closed Cell Foam Backer Rod
Closed cell foam backer rod for use with polyurethane sealant shall conform to ASTM C 1330
Type C
9-04.10 Crack Sealing — Rubberized Asphalt
This section is deleted
9-04.11 Butyl Rubber and Nitrile Rubber
This seetions number is revised to read
9-04.10
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 63
, Revised 8/27/13
�
Section 9-05, Drainage Structures, Culverts, and Conduits
January 7, 2013
9-05.0 Acceptance by Manufacturer's Certification
This section mciuding title is revised to read
9-05.0 Acceptance and Approval of Drainage Structures, and Culverts
The Dramage Structure or Culvert may be selected from the Qualified Products List, or
submitted usmg a Request for Approval of Materials (RAM) m accordance with Section 1-06
Certain dramage materials may be accepted by the Engineer based on a modified acceptance
criteria when materials are selected from the Qualified Products List (QPL) The modified
acceptance criteria are defined in the QPL for each matenal
9-05.1(6) Corrugated Polyethylene Drain Pipe, Couplings, and Fittings (Up to 10
Inch)
This section is supplemented with the following
Corrugated polyethylene drain pipe manufacturers shall participate in the National
Transportation Product Evaluation Program (NTPEP) work plan for HDPE (High Density
Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website displaying they
are NTPEP compliant
9-05.1(7) Corrugated Polyethylene Drain Pipe, Couplings, and Fitt6ngs (12 Inch
Through 60 Inch}
This section is supplemented with the following
Corrugated polyethylene drain pipe manufacturers shall participate in the National
Transportat�on Product Evaluation Program (NTPEP) work plan for HDPE (High Density
Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website displaying they
are NTPEP compliant ,
9 - 05 .2(7) Perforated Corrugated Polyethylene Underdrain Pipe (Up to 10 Inch)
This section is supplemented with the following
PerForated corrugated polyethylene underdram pipe manufacturers shall participate in the
National Transportation Product Evaluation Program (NTPEP) work plan for HDPE (High
Density Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website
displaying they are iVTPEP compliant
9-05.2(8, Perforated Corrugated Polyethylene Underdrain Pipe (12-Inch Through 60
Inch Diameter Maximum), Couplings, and Fittings
This section is supplemented with the following
PerForated corrugated polyethylene underdram pipe manufacturers shalf participate in the
National Transportation Product Evaluation Program (NTPEP) work plan for HDPE (High
Density Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website
displaymg they are NTPEP compliant
9-05.19 Corrugated Polyethylene Culvert Pipe, Couplings, and Fittings
The word "producer" is revised to read "manufacturer"
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Revised 8/27/13
�
�
'
,
LJ
'
�
,
�
�
LJ
�
L�J
�
�
,
�
Page 64
'
'
,
'��
�
'
The second paragraph is revised to read
Joints for corrugated polyethylene culvert pipe shall be made with either a bell/bell or bell and
spigot coupling and shall incorporate the use of a gasket conforming to the requirements of
ASTM D 1056 Type 2 Class B Grade 3 or ASTM F 477 All gaskets shall be factory mstalled
on the coupling or on the pipe by the qualified manufacturer
This section is supplemented with the followmg
pipe manufacturers shall participate in the National
n Program (NTPEP) work plan for HDPE (High Density
and be listed on the NTPEP audit website displaying they
Corrugated polyethylene culvert
' Transportation Product Evaluatio
Polyethylene) Thermoplastic Pipe
are NTPEP compliant
'
,
9-05 20 Corrugated Polyethylene Storm Sewer Pipe, Couplings, and Fittings
The word "producer" is revised to read "manufacturer'
The first paragraph is revised to read
Corrugated polyethylene storm sewer pipe, couplings, and fittings shall meet the requirements
' of AASHTO M 294 Type S or D The maximum pipe diameter for corrugated polyethylene
storm sewer pipe shall be the diameter for which a manufacturer has submitted Fittmgs shall
be blow molded, rotational molded, or factory welded �
i�
�I
'
u
This section is supplemented with the following
Corrugated polyethylene cuivert pipe manufacturers shall participate in the National
Transportation Product Evaluation Program (NTPEP) work plan for HDPE (High Density
Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website displaying they
are NTPEP compliant
9-05.24 Polypropylene Culvert Pipe, Polypropylene Storm Sewer Pipe, and
Polypropylene Sanitary Sewer Pipe
This sections content is deleted and replaced with the following
All �oints for polypropylene pipe shall be made with a bell/bell or bell and spigot coupling and
' shall conform to ASTM D 3212 using elastomeric gaskets conforming to ASTM F 477 All
gaskets shall be factory installed on the pipe in accordance with the producer's
recommendations
'
,
'
ll
'
Qualification for each producer of polypropylene storm sewer pipe requires �oint system
conformance to ASTM D 3212 using elastomeric gaskets conformmg to ASTM F 477 and a
formal quality control plan for each plant proposed for consideration
A Manufacturer's Certificate of Compliance shall be required and shall accompany the
materials delivered to the pro�ect The certificate shall clearly identify production lots for all
matenals represented The Contracting Agency may conduct verification tests of pipe stiffness
or other properties it deems appropriate
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 65
' Revised 8/27113
This section is supplemented with the following new sub-sections
9-05.24(1) Polypropylene Culvert Pipe and Storm Sewer Pipe
Polypropylene culvert and storm sewer pipe shall conform to the following requirements
1
2
3
4
For dual wall pipe sizes up to 30 mches ASTM F2736
For triple wall p�pe sizes from 30 to 60 inches ASTM F2764
For dual wall profile pipe sizes 36 to 60 inches AASHTO MP 21, Type S or Type D
Fittmgs shall be factory welded, in�ection molded or PVC
9-05.24(2) Polypropylene Sanitary Sewer Pipe
Polypropylene sarntary sewer pipe shall conform to the following requirements
1
2
3
For pipe sizes up to 30 inches ASTM F2736
For pipe sizes from 30 to 60 inches ASTM F2764
Fittings shall be factory welded, in�ection molded or PVC
Section 9-06, Structural Steel and Related Materials
April 1, 2013
9-06.5(3) High Strength Bolts
In this section, "AASHTO M 291" is revised to read "ASTM A 563", "AASHTO M 164" is revised to
read "ASTM A 325", "AASHTO M 293" is revised to read "ASTM F 436", "AASHTO M 253" is
revised to read "ASTM A 490", and "AASHTO M 298" is revised to read "ASTM B 695"
9 Anchor Bolts
In this section, "AASHTO M 291" is revised to read "ASTM A 563"
Section 9-07, Reinforcing Steel
August 6, 2012
9 Wire nAesh
The first sentence in the first paragraph is revised to read
Wire mesh for concrete reinforcement shall conform to the requirements of AASHTO M 55,
Welded Steel Wire Fabric for Concrete Reinforcement or AASHTO M 221, Steel Welded Wire
Reinforcement, Deformed for Concrete
Section 9-10, Piling
April 2, 2012
9-10.4 Steel Pile Tips and Shoes
In the first paragraph "ASTM A 148 Grade 60-90" is revised to read "ASTM A 148 Grade 90-60"
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 66
Revised 8/27/13
I I
�
,
'
'
�
,
,
'
'
�
'
'
�
I �
,'�
'
'
'
'
�
Section 9-13, Riprap, Quarry Spalls, Slope Protection, & Rock for Erosion and Scour
Protection and Rock Walls
April 1, 2013
9-13.5(1) Semi-Open Concrete Masonry Units Slope Protection
In this section, "ASTM C 90" is revised to read "ASTM C 1319"
Section 9-14, Erosion Control and Roadside Planting
August 5, 2013
9-14.3 Fertilizer
The second sentence in the first paragraph is revised to read
It may be separate or in a mixture containing the percentage of total nitrogen, available
phosphoric acid, and water-soluble potash or sulfur in the amounts specified
9-14.4(2) Hydraulically Applied Erosion Control Products (HECPs )
The first sentence in the third paragraph is revised to read
All HECPs shall be furnished premixed by the manufacturer with Organic or Synthetic Tackifier
as specified m Section 9-14 4(7)
The third and fourth rows in Table 1 is revised to read
Heavy Metals EPA 6020A Total Metals Anhmony - < 4 mg/kg
Arseruc - < 6 mg/kg
Banum - < 80 mg/kg
Boron - < 160 mg/kg
Cadrruum - < 2 mg/kg
Total Chrorruum - < 4 mg/kg
Copper - < 10 mg/kg
Lead - < 5 mglkg
Mercury - < 2 mg/kg
Nickel - < 2 mg/kg
Seleruum - < 10 mg/kg
StronUum - < 40 mg/kg
Zinc - < 30 m
Water Holding ASTM D 7367 800 percent rrurumum
Ca acit
9-14.4(2)A Long Term Mulch
In the first paragraph, the phrase "within 2 hours of application" is deleted
9-14 4(4) Wood Strand Mulch
The last sentence in the second paragraph is deleted
This section is supplemented with the following new paragraph
The Contractor shall provide Material Safety Data Sheet (MSDS) that demonstrates that the
product is not harmful to plant life and a test report performed in accordance with WSDOT Test
Method 125 demonstrating compliance to this specification prior to acceptance
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 67
' Rev�sed 8/27h3
,.„
9-14.4(8) Compost
The second paragraph is revised to read
Compost production and quality shall comply with WAC 173-350 and for biosolids composts,
WAC 173-308
The third paragraph is to read
Compost products shall meet the following physical criteria
Compost material shall be tested in accordance with U S Composting Councd
Testmg Methods for the Examination of Compost and Composting (TMECC) 02 02-B,
"Sample Sieving for Aggregate Size Classification"
Fine compost shall meet the following gradation
S�eve S�ze Percent Passin
Minimum Maximum
1" 100
5 �s" 90 100
'/4" 75 100
Note Maximum particle length of 4 inches
Medium compost shall meet the following gradation
Sieve Size Percent Passin
M�n�mum Ma�mum
1" 100
,8 85 i o0
'/a" 70 85
Note Maximum particle length of 4 inches Medium compost shall have a carbon to
nitrogen ration (C N) between 18 1 and 35 1 The carbon to nitrogen ration shall
be calculated using dry weight of "Orgarnc Carbon" using TMECC 04 01A
divided by the dry weight of "Total N" using TMECC 04 02D
Coarse compost shall meet the following gradation
Sieve Size Percent Pass�n
Mmimum Max�mum
2" 100
1" 90 100
�/4" 70 100
'/4" 40 60
e
'
e
�
�
��
�1
Note Maximum particle length of 6 inches Coarse compost shail have a carbon to
nitrogen ratio (C N) between 25 1 and 35 1 The carbon to nitrogen ratio shall be ,
calculated using the dry weight of "Organic Carbon" using TMECC 04 01A
divided by the dry weight of "Total N" using TMECC 04 02D
2 The pH shall be befinreen 6 0 and 8 5 when tested in accordance with U S ,
Composting Councd TMECC 04 11-A, "1 5 Slurry pH"
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Revised B/27/13
'
�
Page 68
,
■. 1
,
3 Physical contaminants, defined in WAC 173-350 (plastic, concrete, ceramics, metal,
etc ) shall be less than 0 5 percent by weight as determined by U S Composting
Councd TMECC 03 08-A "Classification of Inerts by Sieve Size"
4 Minimum organic matter shall be 40 percent by dry weight basis as determined by
' U S Composting Councd TMECC 05 07A "Loss-On-Ignition Organic Matter Method
(LOI)"
,
5
Soluble salt contents shail be less than 4 0 mmhos/cm when tested in accordance
with U S Compostmg Counc�l TMECC 04 10 "Electrical Conductivity"
'
�
'
�
7
Maturity shall be greater than 80 percent in accordance with U S Composting
Councd TMECC 05 05-A, "Germination and Root Elongation"
Stability shall be 7-mg CO2—C/g OM/day or below in accordance with U S
Compostmg Councd TMECC 05 08-B "Carbon Dioxide Evolution Rate"
8 The compost product shall origmate from organic feedstocks as defined in WAC 173
« „ ,� „ « „ «
350 as Wood waste , Yard debris , Post-consumer food waste , Pre-consumer
animal-based wastes", and/or "Pre-consumer vegetative waste" The Contractor shall
provide a list of feedstock sources by percentage in the final compost product
9 The Engineer may also evaluate compost for maturity using U S Composting
' Councd TMECC 05 08-E "Solvita� Maturity Index" Fine compost shall score a
number 6 or above on the Solvita� Compost Maturity Test Medium and Coarse
compost shall score a 5 or above on the Solvita� Compost Maturity Test
,
�
'
�
C
'
'
'
'
u
9-14.4(8)A Compost Approval
This section's title is revised to read
9-14 4(8)A Compost Submittal Requirements
The first sentence m this section up until the colon is revised to read
The Contractor shall submit the following information to the Engineer for approval
Item No 2 in the first paragraph is revised to read
2 A copy of the Solid Waste Handling Permit issued to the manufacturer by the
Jurisdictional Health Department m accordance with WAC 173-350 (Minimum Functional
Standards for Solid Waste Handling) or for biosolid composts a copy of the Coverage
Under the General Permit for Biosolids Management issued to the manufacturer by the
Department of Ecology m accordance with WAC 173-308 (Biosolids Management)
9-14.5 Erosion Control Devices
This section is supplemented with the following new sub-section
9-14.5(9) High Visibility Silt Fence
High visibdity sdt fence shall be a mirnmum of 5 feet in height, high visibdity orange, UV
stabilized and shall meet the geotextile requirements in Section 9-33 Table 6 Support posts
shall be in accordance with the Standard Plans The posts shall have sufficient strength and
durability to support the fence through the life of the pro�ect
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 69
, Revised 8127/13
9-14.5(1) Polyacrylamicle (PANID
The fourth sentence is replaced with the following two new sentences
The minimum average molecular weight shall be greater than 5-mg/mole The charge density
shall be no less than 15 percent and no greater than 30 percent
9-14.5(2) Erosion Control Blanket
This section including title is deleted in its entirety and replaced with the following
9-14.5(2) Biodegradable Erosion Control Blanket
Biodegradable erosion control blankets shall be made of natural plant fibers, and all netting
material, if present, shall biodegrade within a life span not to exceed 2 years
The Contractor shall provide independent test results from the National Transportation Product
Evaluation Program (NTPEP) meeting the requirements of Section 9-14 5(2)B, 9-14 5(2)C and
9-14 5(2)D
9-14.5(2jA Approval and Acceptance of Biodegradable Erosion Control Blankets
The erosion control blanket may be selected from the Qualified Products List, or
submitted using a Request forApproval of Matenals (RAM) in accordance with Section 1-
06 Erosion control blankets may be accepted by the Engineer based on the modified
acceptance criteria when materials are selected from the QPL The modified acceptance
criteria are defined in the QPL for each material
9-14.5(2)B Biodegradable Erosion Control Blanket for Slopes Steeper than 3 1(H �
Table 6
Requirements for Slopes
Properties ASTM Test Niethod Steeper than 3 1
Protectmg Slopes from ASTM D 6459 C factor = 0 04 maximum for
Rainfall-Induced Erosion cumulative R-Factor<231
Sod tested shall be sandy
loam as defined by the
NRCS**
Soil Texture Tnangle
Mass Per Unit Area ASTM D 6475 7 6 oz /sq yd mirnmum
Light Penetration ASTM D 6567 44 % maximum
Tensde Strength MD x XD* ASTM D 6818 10 0 x 6 0 pounds/mch mirnmum
Tensile Elongation MD x XD* ASTM D 6818 38% x 33% maximum
"MD is Machine Design and XD is Cross Direction
"*Natural Resource Conservation Services
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Revised 8/27/13
�
CI
,
�
�
,
,
1
�
Page 70
'
il
I�
'
�
'
I�J
,
�
'
'
I�
�
'
�
'
9-14.5(2)C Biodegradable Erosion Control Blanket for Slopes Flatter than 3 1(H �
Table 7
Slope Flatter than 3 1
Properties ASTM Test Method Requirements
Protecting Slopes from ASTM D 6459 C factor = 0 15 maximum for
Rainfall-Induced Erosion cumulative R-Factor<231
Sod tested shall be sandy
loam as defined by the
NRCS**
Soil Texture Triangle
Mass Per Unit Area ASTM D 6475 7 6 oz /sq yd mmimum
Light Penetration ASTM D 6567 40% maximum
Tensde Strength MD x XD* ASTM D 6818 6 5 x 2 3 pounds/inch mmimum
Tensde Elongation MD x XD" ASTM D 6818 38% x 33% maximum
*MD is Machine Design and XD is Cross Direction
*"Natural Resource Conservation Services
9-14.5(2)D Biodegradable Erosion Control Blanket for Ditches
Table 8
Properties Test Method Requirements
Performance in Protecting ASTM D 6460 Limiting Shear (T�,m�t) = 2 0 psf
Earthen Channels from Sod tested shall be sandy minimum
Stormwater-Induced Erosion loam as defined by the
NRCS** Limiting Velocity (V�,m�) = 7 5 ft/sec
Sod Texture Triangle flow mmimum
Mass per Urnt Area ASTM D 6475 7 4 oz / sq yd minimum
Light Penetration ASTM D 6567 65 % maximum
Tensde Strength MD x XD* ASTM D 6818 9 6 x 3 2 Ibs/inch mirnmum
Tensile Elongation MD x XD" ASTM D 6818 38% x 33% maximum
*MD is Machme Design and XD is Cross Direction
**Natural Resource Conservation Services
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 71
' Revised 8/27h 3
9-14.5(3) Clear Plastic Covering
This section mcluding title is revised to read
Plastic Covermg
Plastic covering shall meet the requirements of ASTM D 4397 for polyethylene sheeting
9-14.5(4) Geotextile Encased Check Dam
This section including title is revised to read
9-14.5(4) Check Dams
All materials used for check dams shall be non-toxic and not pose a threat to wddlife when
installed
This section is supplemented with the following new sub-sections
9-14.5(4)A Biodegradable Check Dams
Biodegradable check dams shall meet the following requirements
Biodegradable Check Dams Matenals
Wattle Check Dam 9-14 5(5)
Compost Sock Check Dam 9-14 5(6)
Coir Log Check Dam 9-14 5(7)
�
The Contractor may substitute a different biodegradable check dam as long as it complies with
the following and is approved by the Engineer
1
2
Made of natural plant fiber
Netting if present shall be biodegradable
3 Straw bales shall not be used as check dams
9-14.5(4)B Non-biodegradable Check Dams
Non-biodegradable check dams shall meet the followmg requirements
1 Geotextile materials shall conform to section 9-33 for silt fence
2 Other such devices that fulfill the reqwrements of section 9-14 5(4) and shall be '
approved by the Engineer prior to installation
9-14.5(5) Wattles
The second sentence in the first paragraph is revised to read
Wattle shall be a minimum of 8-inches m diameter
The first sentence in the second paragraph is revised to read
�
�
�
Compost filler shall be Medium Compost and shall meet the material requirements as
specified in Section 9-14 4(8)
The last paragraph is revised to read
Wood stakes for wattles shall be made from untreated Douglas fir, hemlock, or pme species
Wood stakes shall be 2 by 2-inch nominal dimension and a minimum 24 mches in length
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Revised 8/27h 3
'
,
�
�
Page 72
'
'
,
��
'
�
'
'
'
�
'
9-14.5(6) Compost Socks
In this section, "Coarse Compost" is revised to read "Medium Compost"
The last paragraph is revised to read
Wood stakes for compost socks shall be made from untreated Douglas fir, hemlock, or pine
species Wood stakes shall be 2 by 2-inch nominal dimension and a mmimum 24 inches in
length
9-14.5(8) High Visibility F'encing
The first paragraph is revised to read
High visibility fence shall be UV stabdized, orange, high-density polyethylene or polypropylene
mesh
9-14.6(1) Description
In item No C in the fourth paragraph, "22-inch" is revised to read "2-inch"
Section 9-15, Irrigation System
April 1, 2013
9-15.1(2) Polyvinyl Chloride Pipe and Fittings
In the first paragraph, "ASTM D 1784" is revised to read "ASTM D 1785"
Section 9-16, Fence and Guardrail
August 5, 2013
9 Post Material for Chain Link Fence
The first paragraph is revised to read
� Except as noted otherwise, post material shall conform to the requirements of AASHTO M
181, Type 1(zinc-coated steel), Grade 1 or 2, and shall include all round and roll-formed
material (line posts, brace posts, end posts, corner posts, and pull posts)
'
'
'
'
��
L�
�J
�
The last sentence in the fourth paragraph is deleted
9-16.1(1)C Tension Wire and Tension Cable
This section mcluding title is revised to read
9-16.1(1)C Tension Wire
Tension wire shall meet the requirements of AASHTO M 181 Tension wire galvarnzing shall be
Class 1
9 Fittings and Hardware
The second sentence in the first paragraph is deleted
The last paragraph is deleted
9-16.1(2) Approval
This section is deleted
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 73
' Revised 8/27/13
9-16.2(2) Approval
This section is deleted
9-16.3(2) Posts and Blocks
The first sentence m the first paragraph is revised to read
Posts and blocks may be of creosote, pentachlorophenol, waterborne chromate copper
arsenate (CCA), or ammoniacal copper zinc arsenate (ACZA), treated timber, or galvanized
steel (galvanized steel posts only — no blocks)
The following reference is deleted from the third paragraph
ACA
0 50 Ibs pcf
The sixth paragraph is deleted
9-16.4(2) Wire Mesh
This section is revised to read
The galvanized wire mesh shall be a Style 1 double-finnsted hexagonal mesh conforming to
ASTM A 975 with 8 by 10 opernng, except when a colorized, polyvinyl chloride coating is
required then the Style shall be a Style 3
The longitudinal edges of the wire mesh fabric shall have knuckled selvedges with continuous
selvedge wire as specified in ASTM A 975
9-16.4(3) Wire Rope
This section is revised to read
Wire rope shall be �/4- inch-diameter, independent wire rope class (IWRC) 6x19, extra
improved plow steel (EIP) wire rope galvarnzed in accordance with ASTM A1023 Each lot of
wire rope shall be accompanied by a Manufacturer's Cert�ficate of Compliance, a mdl
certificate, and a test report showing the wire rope meets the mirnmum breaking force
requirements of ASTM A 1023
9-16.4(4) Hardware
This section is revised to read
Weldless steel nngs shall be dro{�forged steel and heat treated after forging, have a smgle
pull, working load limit of at least 10,000 Ibs, and meet performance requirements of Federal
Specification RR-C-271 D Type VI
Thimbles reqwred for all wire rope loops shall be standard weight, galvanized, and meet
performance requirements of Federal Spec�ication FF-T-276b Type II
Wire rope clips shall have dro�forged steel bases, be galvanized, and meet performance
requirements of Federal Specification FF-C-450 Type I Class 1
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 74
Rev�sed 8/27M 3
'
'
�
,
II
'
,
�
9 Hog Rings and Tie Wire
This section including title is rewsed to read
9-16 4(5) Fasteners and Lacing Wire
Fasteners shall consist of 11 gauge high tensile steel Lacing wire shall consist of 9 gauge,
zinc-coated steel wire conformmg to ASTM A 641
9-16.4(6) Grout
This section includmg title is deleted
9-16.4(7) Anchor
This section including title and section number is revised to read
9-16.4(6) Ground Anchors
Threaded bar ground anchors shall be deformed, continuously threaded, steel remforcement
bars conforming to either Section 9-07 2 or Section 9-07 11 Threaded bar ground anchors
shall be either epoxy-coated in accordance with Sections 6-02 3(24)H and 9-07 3 or
galvanized after fabrication in accordance with ASTM A 767 Class I
Hollow-core anchor bars shall have continuous threads/deformations and be fabricated from
steel tubing conformmg to ASTM A 519 Couplers and nuts shall provide 100% of the
guaranteed minimum tensde strength of the hollow core anchor bars
Bearing plates shall conform to ASTM A 572 Grade 50 and shall be galvanized after
� fabncation in accordance with AASHTO M 111 Nuts shall conform to either AASHTO M 291
Grade B, hexagonal, or Section 9-0711 Nuts shall be galvanized after fabrication in
accordance with AASHTO M 111 for plate washers and AASHTO M 232 for all other hardware
L'
'
LJ
'
Grout for ground anchors shall be Grout Type 2 for Nonshnnk Applications, conforming to
Section 9-20 3(2)
Concrete for soil anchor deadmen shall be either commercial concrete conforming to Section
6-02 3(2)B or Class 3000 conforming to Section 6-02
Steel reinforcing bars for sod anchor deadmen shall conform to Section 9-07 2, and shall be
epoxy-coated in accordance with Sections 6-02 3(24)H and 9-07 3
9-16.6(3) Posts
This section is revised to read
, Line posts for Types 1 and 2 glare screens shall be 2 inch inside diameter galvanized steel
pipe with a nominal weight of 3 65 pounds per Imear foot End, corner, brace, and pull posts
for Type 1 Design A and B and Type 2 shall be 2'/2 inch inside diameter galvanized steel pipe
with a nominal weight of 5 79 pounds per linear foot Intermediate pull posts (braced line
� posts) shall be as specified for line posts
The base material for the manufacture of steel pipes used for posts shall conform to the
, requirements of ASTM A 53, except the weight tolerance on tubular posts shall be applied as
provided below
�
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 75
' Revised 8/27/13
Posts provided for glare screen wdl have an acceptance tolerance on the weight per linear
foot, as specified, equal to plus or minus 5 percent This tolerance wdl apply to each individual
post
All posts shall be galvarnzed in accordance with AASHTO M 181 Section 32 The mmimum
average zinc coating is per square foot of surFace area This area is defined as the total area
inside and outside A sample for computing the average of mass of coating is defined as a 12-
inch piece cut from each end of the galvanized member
9-16.6(5) Cable
This section mcluding title is revised to read
9-16.6(5) Vacant
9 Cable and Tension Wire Attachments
This section including title is revised to read
9-16.6(6) Tension Wire Attachments
All tension wire attachments shall be galvanized steel conforming to the requirements of
AASHTO M 232 unless otherwise specified Eye bolts shall have either a shoulder or a back-
up nut on the eye end and be provided with an eye nut where needed or standard hex nut and
lock washer 3 /�-inch diameter for tension wire and of sufficient length to fasten to the type of
posts used Turnbuckles shall be of the shackle end type, '/Z inch diameter, with standard take-
up of 6 inches and provided with �/8 inch diameter pins
9 Fabric Bands and Stretcher Bars
The first paragraph is revised to read
Fabric bands shall be %e inch by 1 inch nominal Stretcher bars shall be 3 /,s inch by g/ inch
nominal or 5 /,s inch diameter round bar nominal A 5 /�s mch diameter round stretcher bar shall
be used with Type 1 Nominal shall be construed to be the area of the cross section of the
shape obtained by multiplymg the specified width by thickness A variation of minus 5-percent
from this theoretical area shall be construed as "nominal" size All shall be galvanized to meet
the requirements of ASTM F 626
9-16.7 Vacant
This section including title is deleted in its entirety
9-16.8 Weathering Steel Beam Guardrail
This section including title is deleted in its entirety
Section 9-18, Precast Traffic Curb and Block Traffic Curb
August 6, 2012
This section's title is revised to read
9-18 Precast Traffic Curb
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 76
Rewsed 8/27/13
'
1
'
l_ 1
'
,
,
'
,
'
1
'
'
l!
,
'
,
'
9-18.3 Block Traffic Curb
This section including title is revised to read
9-18.3 Vacant
Section 9-20, Concrete Patching Material, Grout, and Mortar
January 2, 2012
9-20.3(3) Grout Type 3 for Unconfined Bearing Pad Applications
This section is revised to read
Grout Type 3 shall be a prepackaged material meeting the requirements of ASTM C 928 —
Table 1, R2 Concrete or Mortar
9-20.3(4) Grout Type 4 for Multipurpose Applications
In the third sentence of the first paragraph, the reference "0 40" is revised to read "0 45"
Section 9-23, Concrete Curing Materials and Admixtures
August 5, 2013
9-23.2 Liquid Membrane-Forming Concrete Curing Compounds
In the first paragraph, "moisture loss° is revised to read "water retention"
9-23.6(9) Type S Specific Performance Admixtures
The first sentence is revised to read the following finro new sentences
Type S Specific PerFormance admixtures are limited to ASR-mitigatmg, viscosity modifying,
shrinkage reducmg, rheology-controllmg, and workability-retairnng admixtures They shall
conform to the requirements of ASTM C 494 Type S
Section 9-26, Epoxy Resins
August 5, 2013
9-26.3(1)A Traffic Bearing Applications
The first sentence in the first paragraph is revised to read
Epoxy grout/mortar/concrete for traffic bearing applications shall have a 7-day compressive
strength of not less than 4,000 psi when tested in accordance with ASTM C 579
Section 9-28, Signing Materials and Fabrication
April 1, 2013
9-28.14(2) Steel Structures and Posts u
AASHTO M 291 is revised to read ASTM A 563 and AASHTO M 293 is revised to read
"ASTM F 436"
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 77
' Revised 8/27/13
Section 9-29, Illumination, Signal, Electrical
August 5, 2013
9-29.1(4) Non-Metallic Conduit
This section is supplemented with the following new sub-section
9-29.1(4)D Deflection Fittings
Deflection Fittings for use with rigid PVC conduit shall be as described in 9-29 1(2)A
9-29.2 Junction Boxes, Cable Vaults, and Pull Boxes
The section is supplemented with the following
The Contractor shall perform quality control inspection The Contracting Agency intends to
perForm Quality Assurance Inspection By its inspection, the Contracting Agency intends only
to verify the quality of that Work This inspection shall not relieve the Contractor of any
responsibdity for identifymg and replacing defective material and workmanship Prior to the
start of production of the precast concrete units, the Contractor shall advise the Engineer of
the production schedule The Contractor shall give the Inspector safe and free access to the
Work If the Inspector observes any nonspecification Work or unacceptable quality control
practices, the Inspector wdl advise the plant manager If the corrective action is not acceptable
to the Engineer, the unit(s) will be re�ected
9-29.2(1) Standard Duty and Heavy-Duty Junction Boxes
The third paragraph is deleted and replaced with the following new paragraphs ,`
The Contractor shall provide shop drawings for all components, hardware, lid, frame,
reinforcement, and box dimensions The shop drawings shall be prepared by (or under the
supervision ofl a Professional Engineer, licensed under Title 18 RCW, State of Washington, m
the branch of Civd or Structural, and each sheet shall include the following
Professional Engineer's original signature, date of signature, original seal,
registration number, and date of expiration
E
3
The initials and dates of all participating design professionals
Clear notation of all revisions including identification of who authorized the revision,
who made the revision, and the date of the revision
4 Design calculations shall carry on the cover page, the Professional Engineer's
original signature, date of signature, origmal seal, registration number, and date of
expiration
For each type of �unction box, or whenever there is a change to the �unction box design, a
proof test, as defined in this Specification, shall be perFormed and new shop drawmgs
submitted
9-29.2(1)A Standard Duty Junction Boxes
The first paragraph is supplemented with the following
All Standard Duty Junction Boxes placed in sidewalks, walkways, and shared use paths shall
have slip resistant surFaces Non-slip lids and frames shall be hot dip galvanized in
accordance with AASHTO M 111
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 78
Revised 8/27/13
'
,
'
'
,
1
'
'
�
'
'
'
'
'
The sub-paragraph's titled "Concrete Junction Boxes" are revised to read
Concrete Junction Boxes
The Standard Duty Concrete Junction Box steel frame, lid support, and lid shall be painted
with a black paint containing rust mhibiters or painted with a shop applied, inorgarnc zinc
primer in accordance with Section 6-07 3, or hot-dip galvanized in accordance with AASHTO
M 111
Concrete used m Standard Duty Junction Boxes shall have a minimum compressive strength
of 6,000 psi when reinforced with a welded wire hoop, or 4,000 psi when reinforced with
welded wire fabric or fiber reinforcement The frame shall be anchored to the box by welding
headed studs s/e by 3 inches long, as spec�fied m Section 9-06 15, to the frame The wire fabric
shall be attached to the studs and frame with standard tie practices The box shall contain ten
studs located near the centerline of the frame and box wall The studs shall be placed one
anchor in each corner, one at the middle of each width and finro equally spaced on each length
of the box
Matenals for Type 1, 2, and 8 Concrete Junction Boxes shall conform to the following
Materials Requirement
Concrete Section 6-02
Reinforcmg Steel Section 9-07
Fiber Remforcing ASTM C 1116, Type III
Lid ASTM A 786 diamond plate steel
Slip Resistant Lid ASTM A 36 steel
Frame ASTM A 786 diamond plate steel or ASTM
A36 steel
Slip Resistant Frame ASTM A 36 steel
Lid Support ASTM A 36, or ASTM A1011 Grade SS
Handle & Handle support ASTM A 36 steel or ASTM A1011 Grade
CS or SS
Anchors (studs) Section 9-06 15
ASTM F 593 or A 193, Type 304 or 316, or
Bolts, Studs, Nuts, Stainless Steel grade 302, 304, or 316
Washers steel in accordance with approved shop
drawin
Locking and Latching In accordance with approved shop
Mechanism Hardware drawmgs
and Bolts
, 9-29.2(1)B Heavy Duty Junction Boxes
The section is revised to read
' Heavy-Duty Junction Boxes shall be concrete and have a minimum vertical load rating of
46,000 pounds without permanent deformation and 60,000 pounds without fadure when tested
m accordance with Section 9-29 2(1)C
'
'
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 79
' Revised 8/27113
ra
The Heavy-Duty Junction Box steel frame, lid support and lid shall be painted with a shop
applied, inorganic zinc primer m accordance with Section 6-07 3
Materials for Type 4, 5, and 6 Concrete Junction Boxes shall conform to the following
Materials Requirement
Concrete Section 6-02
Reinforcing Steel Section 9-07
ASTM A 786 diamond plate steel, rolled
from plate complymg with ASTM A 572,
Lid grade 50 orASTM A 588, and having a
min CVN toughness of 20 ft-Ib at 40
de rees F
Frame and stiffener ASTM A 572 grade 50 or ASTM A 588, both
plates with min CVN toughness of 20 ft-Ib at 40
de rees F
Handle ASTM A 36 steel or ASTM A 1011 Grade
CS or SS
Anchors (studs) Section 9-06 15
Bolts, Studs, Nuts, ASTM F 593 or A 193, Type 304 or 316, or
Washers Stainless steel grade 302, 304, or 316 in
accordance with a roved sho drawin
Hinges and Locking and � accordance with approved shop
Latching Mechanism drawings
Hardware and Bolts
The lid stiffener plates shall bear on the frame, and be milled so that there is full even contact,
around the perimeter, between the bearing seat and lid stiffener plates, after fabrication of the
frame and lid The bearmg seat and lid perimeter bar shall be free from burrs, dirt, and other
foreign debris that would prevent solid seating Bolts and nuts shall be liberally coated with
anti-seize compound Bolts shall be installed snug tight The bearmg seat and lid perimeter bar
shall be machined to allow a minimum of 75 percent of the bearing areas to be seated with a
tolerance of 0 0 to 0 005 inches measured with a feeler gage The bearing area percentage
will be measured for each side of the lid as it bears on the frame
9-29.2(1)C Testing Requirements
The first paragraph is revised to read
The Contractor shall provide for testing of �unction boxes, cable vaults and pull boxes
Junction boxes, cable vaults and pull boxes shall be tested by an mdependent matenals
testmg facility, and a test report issued documentmg the results of the tests performed
The second paragraph is revised to read
For concrete �unction boxes, vaults and pull boxes, the independent testing laboratory shall
meet the requirements of AASHTO R 18 for Qualified Tester and Verified Test Equipment The
test shall be conducted in the presence of a Professional Engineer, licensed under Title 18
RCW, State of Washington, in the branch of Civil or Structural, and each test sheet shall have
the Professional Engineer's original signature, date of signature, original seal, registration
number, and date of expiration One copy of the test report shall be furrnshed to the
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Rev�sed 8/27h3
u
�i
'J
�l
'
'
'
'
�
Page 80
'
�
'
'
�
,
�
,
,
�
,
L�
�_��'
'
'
'
'
'
'
Contracting Agency certifymg that the box and cover meet or exceed the loadmg requirements
for a concrete �unction box, and shall mclude the following information
Product identification
2 Date of testing
3 Description of testing apparatus and procedure
4
5
6
7
All load deflection and fadure data
Weight of box and cover tested
Upon completion of the reqwred test(s) the box shall be loaded to failure
A brief description of type and location of fadure
The third paragraph is revised to read
For non-concrete �unction boxes the mdependent testing laboratory shall meet the
requirements of AASHTO R 18 for Qualified Tester and Verified Test Equipment The test shall
be conducted m the presence of a Professional Engineer, licensed under Title 18 RCW, State
of Washington, in the branch of Civil or Structural, and each test sheet shall have the
Professional Engineer's original signature, date of signature, original seal, registration number,
and date of expiration One copy of the test report shall be furrnshed to the Contracting
Agency certifying that the box and cover meet or exceed the loading requirements for a non-
concrete �unction box, and shall include the following information
1 Product identification
2 Date of testing
3 Description of testing apparatus and procedure
4 All load deflection data
5 Weight of box and cover tested
The first paragraph following the title "Testing for the Standard Duty Non-Concrete Junction
Boxes" is revised to read
Non-concrete Junction Boxes shall be tested as defined in the ANSI/SCTE 77-2007 Tier 15
test method with test load mirnmum of 22,500 Ibs In addition, the Contractor shall provide a
Manufacture Certificate of Compliance for each non-concrete �unction box installed
9 Standard Duty and Heavy Cable Vaults and Pull Boxes
This section is revised to read
Standard Duty and Heavy-Duty Cable Vaults and Pull Boxes shall be constructed as a
concrete box and as a concrete lid The lid for the Heavy-Duty and Standard Duty Cable
Vaults and Pull Boxes shall be mterchangeable and both shall fit the same box as shown m
the Standard Plans
The Contractor shall provide shop drawings for all components, including concrete box, Cast
Iron Ring, Ductde Iron Lid, Steel Rings, and Lid In addition, the shop drawings shall show
placement of reinforcing steel, knock outs, and any other appurtenances The shop drawing
shall be prepared by or under the direct supervision of a Professional Engineer, licensed under
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 81
' Revised 8/27/13
r`
Title 18 RCW, State of Washington, in the branch of Civd or Structural, and each sheet shall
carry the following
�
3
Professional Engineer's original signature, date of signature, original seal,
registration number, and date of expiration
The irntials and dates of all participatmg design professionals
Clear notation of all revisions includmg identification of who authonzed the revision,
who made the revision, and the date of the revision
4 Design calculations shall carry on the cover page, the Professional Engineer's
original signature, date of signature, original seal, registration number, and date of
expiration
For each type of box or whenever there is a change to the Cable Vault or Pull box design, a
proof test, as defined in this Specification, shall be performed and new shop drawings
submitted
9-29.2(2)A Standard Duty Cable Vaults and Pull Boxes
This section is revised to read
Standard Duty Cable Vaults and Pull boxes shall be concrete and have a minimum load rating
of 22,500 pounds and be tested in accordance with Section 9-29 2(1)C for concrete Standard
Duty Junction Boxes
Concrete for standard duty cable vaults and pull boxes shall have a minimum compressive
strength of 4,000 psi The lid frame shall be anchored to the vault/box concrete lid by welding
headed studs �/ by 3 inches long, as specified m Section 9-06 15, to the frame The wire fabric
shall be attached to the studs and frame with standard tie practices The vaulUbox concrete lid
shall contain ten studs located near the centerline of the frame and wall Studs shall be placed
one anchor in each corner, one at the middle of each width and finro equally spaced on each
length of the vault/box The steel frame, lid support, and lid shall be painted with a black paint
containing rust inhibiters or painted with a shop applied, inorganic zmc primer in accordance
with Section 6-07 3 or hot-dip galvanized in accordance with ASTM M 111
All Standard Duty Cable Vaults and Pull Boxes placed in sidewalks, walkways, and shared-
use paths shall have slip-resistant surfaces The steel frame, lid support, and lid for the
Standard Duty Cable Vaults and Pull Boxes shall be hot-dip galvarnzed
Materials for Standard Duty Cable Vaults and Pull Boxes shall conform to the following
Materials Requirements
Concrete Section 6-02
Reinforcmg Steel Section 9-07
Lid ASTM A 786 diamond plate steel
Slip Resistant Lid ASTM A 36 Steel
Frame ASTM A 786 diamond plate steel or ASTM A 36
Slip Resistant Frame ASTM A 36 Steel
Lid Support ASTM A 36 Steel, orASTM A 1011 Grade SS
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Rewsed 8/27/13
C�
�
,
'
�
Page 82
'
r�
�
��
��
�
'
�
LJ
'
1
, i�
�
'
,
'
�
'
'
'
'
9 Heavy Cable Vaults and Pull Boxes
This section is revised to read
Heavy-Duty Cable Vaults and Pull Boxes shall be constructed of concrete having a mmimum
compressive strength of 4,000 psi, and have a minimum vertical load ratmg of 46,000 pounds
without permanent deformation and 60,000 pounds without failure when tested in accordance
with Section 9-29 2(1)C for Heavy-Duty Junction Boxes
Materials for Heavy Duty Cable Vaults and Pull boxes shall conform to the following
9 Slip Base Hardware
"AASHTO M 291" is revised to read "ASTM A 563", "AASHTO M 164" is revised to read "ASTM A
325", and "AASHTO M 293" is revised to read "ASTM F 436
9-29.6(5) Foundation Hardware
"AASHTO M 291" is revised to read "ASTM A 563"
9-29.10 Luminaires
The third paragraph is revised to read
All luminaires shall be provided with markers for positive identification of light source type and
wattage in accordance with ANSI C136 15-2011 Legends shall be sealed with transparent fdm
resistant to dust, weather, and ultraviolet exposure
9-29.10(2) Decorative Luminaries
The second sentence in the third paragraph is deleted
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 83
' Revised 8/27/13
9-29.13 Traffic Signal Controllers
This section and all sub-sections including title is revised to read
9-29 13 Control Cabmet Assemblies
Control cabinet assemblies shall include all necessary equipment and auxdiary equipment for
controlling the operation of traffic signals, programmable message signs, illumination systems,
ramp meters, data stations, CCN, and simdar systems as required for the specific application
Traffic Signal Controller Cabinet Assemblies shall meet the requirements of the NEMA TS1
and TS2 specification or the California Department of Transportation "Transportation Electrical
Equipment Specifications° (TEES) dated March 12, 2009 as defined in this specification
9-29.13(1) Environmental, Performance, and Test Standards for Solid-State Traf�c
Controller Assemblies
The scope of this Specification includes the controller of solid-state design installed in a
weatherproof controller cabmet The controller assembly mctudes the cab�net, controller
unit, load switches, signal conflict monitoring circuitry, accessory logic circuitry, AC line
filters, vehicle detectors, coordination equipment and interFace, and preemption
equipment NEMA control assemblies shall meet or exceed current NEMA TS 1
Environmental Standards Normal operation wdl be required whde the control assembly is
sub�ected to any combmation of high and low environmental limits (such as low voltage at
high temperature with high repetition noise transients) All other control equ�pment shall
meet the environmental requirements of California Department of Transportation
"Transportation Electrical Equipment Specdications" (TEES) dated March 12, 2009
The Contractor shall fumish to the Contracting Agency all guarantees and warranties
furnished as a normal trade practice for all control equipment provided
9-29 13(2) Manufacturing Quality
The fabncator of the Control, cabinet Assemblies shall perform quality control (QC)
inspections based on their QC program Their QC program shall be submitted and
approved by WSDOT at least annually The fabricator of the controller shall certify that the
controller meets all requirements of the Standard Specificat�ons and Speaal Provisions
for the specific application
The QC program shall include, but not be limited to, the following
Quality Statement
2
3
4
5
Individual responsible for quality (orgarnzational chart)
Fabrication procedures
Test procedures
Documented mspection reports
6 Documented test reports
7 Certification package
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 84
Revised 8/27/13
�
'
'
��
'
,
�
,
�
�
,
�
�
�
�
9-29.13(2)A Traffic Signal Controller Assembly Testing
Each tra�c signal controller assembly shall be tested as follows The supplier shall
Seven days prior to shipping, arrange appointment for controller cabinet
assembly, and testing at the WSDOT Materials Laboratory or the facility
designated in the Special Provisions
2 Assembly shall be defined as but not limited to tighternng all screws, nuts
and bolts, ver�fying that all winng is clear of moving parts and properly
secured, mstalling all pluggables, connecting all cables, Verify that all
Contract required documents are present, proper documentation is
provided, and all equipment required by the Contract is installed
3 The assembly shall be done at the designated WSDOT facdity in the
presence of WSDOT personnel
4 The supplier shall demonstrate that all of the functions required by this
Specification and the Contract Plans and Special Provisions perform as
intended Demonstration shall include but not be limited to energizing the
cabmet and verifying that all 8 phases, 4 pedestrian movements, 4 overlaps
(as required by the Contract Prov�sions) operate in accordance with Section
9-29 13 The supplier shall place the controller in mmimum recall with
interval timing set at convenient value for testmg purposes Upon a
satisfactory demonstration the controller assembly will then be accepted by
WSDOT for testing
5 If the assembly and acceptance for testing is not complete within 5 working
days of delivery, the Pro�ect Engineer may authorize the return of the
assembly to the supplier, with collect freight charges to the supplier
6 The Contractor wdl be notified when the testing is complete, and where the
assembly is to be picked-up for delivery to the pro�ect ,
7 The supplier has 5 workmg days to repair or replace any components that
fail during the testing process at no cost to the Contracting Agency A fadure
shall be defined as a component that no longer functions as intended under
the conditions required or does not meet the requirements of the Contract
Specifications and is at the sole discretion of WSDOT
8 Any part or component of the controller assembly, including the cabinet that
is re�ected shall not be submitted for use by WSDOT or any City or County
in the State of Washington
9-29.13(3) Traffic Signal Controller
' The traffic signal controller shali conform to the Contract requirements and the applicable
Specifications as listed below All solid-state electronic traffic-actuated controllers and
their supplemental devices shali employ digital timing methods
�
�
�
�
�
A NEMA control and all auxiliary equipment shall conform to current NEMA TS1 or
TS2 Specification Every pin of every connecting plug shall be utdized as
described within the NEMA requirement, except that those pms identified as
"spare" or "future" shall remain unused
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 85
Revised 8/27/13
B Type 170E controllers shall conform to the TEES The 170E controller shall be
provided with a program card, one blank ROM chip, and finro 64K non-volatde
memory chips
C Type 170E/HC-11 controllers shall conform to the current Oregon Department of
Transportation Specification for model 170E/HC-11 controiler The 170E
controller with the HC11 chip shall be compatible with the software specified in
the Contract The controller shall be provided with one ROM chip and one 64K
non-volatile memory chip
D Vacant
E Type 2070 controllers shall conform to the TEES The standard 2070 controller
shall consist of the following
2070 2070E 2070N1
2070-5 VME ��"
ca e `
2070-1 E CPU 2070-1 E CPU 2070-1 E CPU Card
Card Card �
2070-3B Front 2070-36 2070-36 Front Panel
Panel Front Panel
2070-4 Power 2070-4 Power 2070-4 Power
Su I Su I Su I
2070-2A Field 2070-2A Field 2070-26 Field I/O
I/O I/O
X X 2070-8 I nterface
9-29.13(4) Traf�c-Signal Controller Software
All traffic signal controllers shall operate with software specified in the contract
Traffic-actuated controllers shall be electronic devices which, when connected to traffic
detectors or other means of actuation, or both, shall operate the electrical traffic signal
system at one or more intersections
If the complete traffic controller defined in the Special Provision requires NTCIP
compliance the following are the mirnmum requirements for NTCIP operation
Communication
The traffic controller hardware and software shall communicate with the central computer
m a polled multi-drop operation In the polled multi-drop operation, several tra�c
controllers shall share the same commurncation channel, with each controller assigned a
unique ID number Controller ID numbers shall conform to the NTCIP requirements for
address numbers A traffic controller shall only reply to messages labeled with its ID In
polled multi-drop mode, traffic controllers never mitiate commurncation, but merely
transmit their responses to messages from the central computer
A laptop computer connected to the traffic controller's local communication port shall have
the same control and diagnostic capabilities as the central computer However, local
laptop control capability shall be limited to that traffic controller
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 86
Rev�sed 8/27/13
,
NTCIP Requirements
' The traffic controller software shall comply with the National Transportation
Communications for ITS Protocol (NTCIP) documents and all related errata sheets
published before July 1, 1999 and as referenced herein
'
�
,
,
LJ
'
'
'
'
'
,
'
C
�
'
t
The traffic controller software shall support the following standards
1
2
3
4
NTCIP 1101, S�mple Transportat�on Management Framework (STMF),
Conformance Level 1(Simple Nefinrork Management Protocol (SNMP))
NTCIP 2001, Class B Profile All serial ports on the device shall support
communications according to these standards
NTCIP 2101, SP-PMPP/RS232 Point-to-Multi-Point Protocol (PMPP)
NTCIP 2201, NTCIP TP-Null Transport Profde Null (TP-NULL)
The traffic controller software shall implement all mandatory ob�ects of all mandatory
conformance groups as defined in NTCIP 1201, Global Ob�ect Defin�t�ons, and NTCIP
1202, Ob�ect De�n�t�ons for Actuated Traffic S�gnal Controller Un�ts Software shall
implement the following conformance groups
NTCIP 1202, Ob�ect DefinitionsforASC
Conformance Grou Reference
Confi uration 1201 2 2
Time Mana ement
Time Base Event Schedule
Re ort 2 5
Phase 1202 2 2
Rin s 2 8
Detector 2 3
Unit 2 4
Preem t 2 7
Time Base 2 6
Coordination 2 5
Channel 2 9
Overla s 2 10
The software shall implement the followmg optional ob�ects
0
Ob�ects required by these specifications shall support all values within its
standardized range The standardized range is defined by a size, range, or
enumerated listing indicated in the ob�ect's SYNTAX field and/or through descnptive
text in the ob�ect's description field The following list indicates the modified obJect
requirements for these ob�ects
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 87
' Revised 8/27/13
Ob�ect Ob�ect Minimum
Name ID Re uirements
Global Confi uration moduleT e Value 3
Database Mana ement dBCreateTransaction All Values
dBErrorT e All values
Time Mana ement IobslDa li htSavin s Values 2 and 3
Timebase Events Schedule maxTimeBaseScheduleEntries 16
MaxDa Plans 15
MaxDa Events 10
Re ort maxEventLo Con ifs 50
MventConfi Mode Values 2 thru 5
mventConfi Action Values 2 and 3
MaxEventLo Size 255
MaxEventClasses 7
PMPP maxGrou Address 2
ASC Phase maxPhases 8
PhaseStart Values 2 thru 6
hase0 tions All Values
maxPhaseGrou s 1
Rin s maxRin s 2
maxSe uences 16
Detector maxVehicleDetectors 64
vehicleDetector0 tions All Values
maxPedestrianDetector 8
Urnt unitAutoPedestrianClear All Values
unitControlStatus All Values
unitFlashStatus All Values
unitControl All Values
maxAlarmGrou s 1
S ecial Function maxS ecialFunctionsOut uts 8
Coordination coordCorrectionMode Values 2 thru 4
coordMaximumMode Values 2 thru4
coordForceMode Values 2 and 3
maxPatterns 48
atternTableT e Either 2,3 or 4
maxS lits 16
s IitMode Values 2 thru 7
IocalFreeStatus Values 2 thru 11
Time Base maxTimebaseAscAction 48 \
Preem t maxPreem ts 4
reem tControl All Values
reem tState Values 2 thru 9
Overla s maxOveria s 4
overla T e Value 2 and 3
maxOverla statusGrou 1
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 88
Revised 8/27/13
�
�
'
'
'
�
'
'
��I
�
Ob�ect Ob�ect Minimum
Name ID Re uirements
Channels maxChannels 16
channelControlGrou Values 2 thru 4
channelFlash Value
0,2,4,6,8,10,12 and
14
channelDim Values 0 thru 15
maxChannelStatusGrou 2
TS 2 Port 1 maxPortAddresses 18
ort1Table Values 2 and 3
* values m excess of the mirnmum requirement are considered to meet the specification
Documentation
Software shall be supplied with all documentation on a CD ASCII versions of the
following Management Information Base (MIB) fdes in Abstract Syntax Notation 1(ASN 1)
format shall be provided on CD-ROM
The official MIB Module referenced by the device functionality
2 A manufacturer-specific version of the official MIB Module with the non-
standardized range mdicated in the SYNTAX field The fdename shall match the
official MIB Module, with the extension "spc"
3 A MIB Module of all manufacturer-specific ob�ects supported by the device with
accurate and meaningful DESCRIPTION fields and the supported ranges
indicated in the SYNTAX field
9-29.13(5) Flashing Operations
' All traffic signals shall be equipped for flashmg operation of signal displays Controliers
and cabinets shall be programmed for flashing red displays for all approaches Dunng
flashing operation, all pedestrian circuits shall be de-energized
'
—,
L I '
�
'
,
�
'
Actuated traffic signal control mecharnsms shall be capable of entry mto flash operation
and return to stop-and -go operation as follows
Terminal Strip Input (Remote Flash) When called as a function of a terminal strip
input, the controller shall provide both sequenced entry mto flash and sequenced
return to normal operation consistent with the requirements of the latest edition
of the Manual on Uniform Traific Control Devices
2 Police Panel Switch When the flash-automatic switch located behind the police
panel door is turned to the flash position, the signals shall immediately revert to
flash, and, the controller shall have a stop time input applied When the switch is
placed on automatic, the controller shall immediately time an 6 second all red
period then resume stop-and-go operations at the beginning of ma�or street
green
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 89
' Rev�sed 8/27/13
3 Controller Cabinet Switches When the flash-automatic switch located inside the
controller cabmet is placed in the flash position, the signals shall immediately
revert to flash, however, the controller shall not have a stop time input applied
When the flash-automatic switch is placed in the automatic position, the
controller shall immediately time a 6 second all red period, then resume stop-
and-go operation at the beginrnng of the ma�or green
4 Power Interruption On "NEMA" controllers any power mterruption longer than
475 plus or minus 25 mdliseconds, signals shall re-energize consistent with No
2 above to ensure an 6-second itash period pr�or to the start of ma�or street
green A power mterruption of less than 475 plus or minus 25 mdliseconds shall
not cause resequencmg of the controller and the signal displays shall re-
energize without change Type 170 controllers shall re-energize consistent with
No 2 above after a power interruption of 1 75 plus or minus 0 25 seconds The
6-second flash period will not be required Any power interruption to a 2070 type
controller shall result in a 6 second flash period once power is restored
5 Conflict Monitor Upon detecting a fault condition the conflict morntor shall
immediately cause the signai to revert to flash and the controller to stop time
After the conflict monitor has been reset, the controller shall immediately take
command of the signal displays at the beginning of ma�or street green
9-29.13(6) Emergency Preemption
Immediately after a valid call has been received, the preemption equipment shall cause
the controller to termmate the appropriate phases as necessary with the required
clearance intervals and enter any programed subsequent preemption sequence
Preemption sequences shall be as noted in the Contract
9-29.13(7) W�r�ng D�agrams
Schematic wirmg diagrams of the controllers, cabinets and auxdiary equipment shall be
submitted when the assemblies are delivered The diagram shall show in detad all arcuits
and parts The parts shall be identified by name or number in a manner readdy
interpreted Two hard copies of the cabinet wiring diagram and component wir�ng
diagrams shall be furrnshed with each cabinet and a pdf file of the cabinet wiring and
component drawings The schematic drawing shall consist of a single sheet, detailing all
circuits and parts, not to exceed 52-inches by 72-mches The cabinet wiring diagram shall
indicate and identify all wire terminations, all plug connectors, and the locations of all
equipment in the cabinet Included in the diagram shall be an mtersection sketch
identifymg all heads, detectors, and push buttons and a phase diagram
9-29.13(8) Generator Transfer Switch
When specified in the contract, A generator transfer switch shall be included The
Generator Transfer Switch shall be capable of switching power from a utility power source
to an external generator power source
The Transfer Switch enclosure shall be of identical materials and dimensions and
mstallation methods as the Police Panel type enclosure spec�fied in the first paragraph of
Special Provision 9-29 13(10)D except that the enclosure door shall include a spring
loaded construction core lock capable of accepting a Best 6-pin CX series core The core
lock shall be installed with a green construction core Upon contract completion, two
master keys for the construction core shall be delivered to the Engineer
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 90
Revised 8/27/13
'
'
'
'
1
'
'
'
,
'
'
�
�
1
'
,
�
��
The enclosure shall include the following Transfer Switch equipment
1
E
3
One Nema L5-30P Flanged Inlet generator connector
One Utdity power indicator light
One generator mdicator light
4 Two 30 amp, 120 volt, single pole, single phase, circuit breakers One circuit
breaker shall be labeled "Generator" and the other circuit breaker shall be
labeled "Utdity" Both labels shall be engraved phenolic name plates
5 A mechanical lock out feature that prevents the Utility circuit breaker and the
Generator circuit breaker from being in the ON position at the same time The
circuit breakers shall be capable of being independently switched
�
�•
7
The conductors from the Generator Transfer Switch enclosure to the cabinet
circuit breaker shall be enclosed in nylon mesh sleeve
The enclosure door shall be labeled with the letters "GTS"
9-2913(9) Vacant
9-29.13(10) NEMA, Type 170E, 2070 Controllers and Cabinets
9-29.13(10)A Auxiliary Equipment for NEMA Controtters
The following auxdiary equipment shall be furnished and installed in each cabinet for
NEMA traffiGactuated controllers
1
�
3
A soiid-state Type 3 NEMA flasher with flash-transfer relay which wdl cut in
the flasher and isolate the controller from light circwts See Section 9-
29 13(5) for operational requirements
Modular solid state relay load switches of sufficient number to provide for
each vehicle phase (mcluding future phases if shown in the plans), each
pedestrian phase and preemption sequence indicated in the Contract Type
P& R cabinets shall mclude a fully wired 16-position back panel Solid-state
load switches shall conform to NEMA standards except only optically
isolated load switches will be allowed Load switches shall include indicator
lights on the input and output arcuits The controller cabinet shall have all
cabmet wiring installed for eight vehicle phases, four pedestrian phases,
four emergency pre-empts, four overlaps (OLA, B, C, D)
A power panel with
a A control-display breaker sized to provide 125 percent overload
protection for all control equipment and signal displays, 20 ampere
mirnmum
b A 15 ampere accessory breaker wired parallel to the control display
breaker The breaker wdl carry accessory loads, including vent fan,
cabmet light, plug receptacle, etc
c A busbar isolated from ground and unfused for the neutral side of
power supply
AMENDMENTS TO THE 2012 STANDARD SPECIFICAT(ONS BOOK Page 91
' Rewsed 8/27/13
d A radio mterference suppresser installed at the input power point
Interference suppressers shall be of a design which will minimize
interference in both broadcast and aircraft frequencies, and shall
provide a m�nimum attenuat�on of 50 decibels over a frequency range
of 200 kilohertz to 75 megahertz when used in connection with normal
mstallations The interference filters furnished shall be hermetically
sealed in a substantial case filled with a suitable insulating compound
Terminals shall be rnckel plated, 10-24 brass studs of sufficient external
length to provide space to connect two 8 AWG wires, and shall be so
mounted that they cannot be turned in the case
Ungrounded terminals shall be insulated from each other and shall
maintam a surface leakage distance of not less than '/�-inch befinreen
any exposed current conductor and any other metall�c parts with an
insulation factor of 100-200 megohms dependent on external circuit
conditions
Suppressers shall be designed for operations on 5Q amperes, 125
volts, 60 cycles, single wire circuits, and shall meet standards of the
Underwriters' Laboratories and the Radio Manufacturers Association
e A Surge Protection Device connected to the controller power circuit for
protection aga�nst voltage abnormalities of 1 cycle or {ess duration The
Surge Protection Device shall be a solid state high energy circuit
contairnng no spark gap, gas tube, or crow bar component The device
shall provide transient protection befinreen neutral and ground, line and
ground, as well as line and neutral If the protection circuits fad, they
shall fad to an open c�rcuit condition The min�mum mterruptmg capacity
shall be 10,000 Amps The Voltage Protection Ratmg shall be 600 volts
or less when sub�ected to an impulse of 6,000 volts, 3,000 amp source
impedance, 8 0/20 microsecond waveform as described in UL 1449 In
addition, the device shall dissipate a 13,000 Amp or greater repeated
single peak 8/20 microsecond current impulse, and withstand, without
fadure or permanent damage, one full cycle at 264 volts RMS The
device shall contain circuitry to prevent self-induced regenerative
ringing There shall be a failure warrnng indictor which shall illuminate a
red light or extinguish a green light when the device has faded and is
no longer operable
Cabinet ground busbar mdependent (150K ohms minimum) of neutral
4 A police panel located behind the police panel door with a flash automat�c
switch and a control-display power line on-off switch See Sect�on 9-
29 13(5) for operational requirements
5 An auxiliary control panel located inside the controller cabinet with a flash-
automatic switch and a controller on-off switch See Section 9-29 13(5) for
operational requirements A three wire 15 ampere plug receptacle with
grounding contact and 15 ampere ground fault interrupter shall also be
provided on the panel
6 A conflict monitor conforming to NEMA standards See Section 9-29 13(5)
for operational requirements The unit shall monitor conflicting signal
indications at the field connection terminals The unit shall be wired in a
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 92
Revised 8/27/13
�
'
'
,
'�'
,
LJ
,
�
'
'
�
1
,
'
�
'
LJ
manner such that the signal will revert to flash if the conflict morntor is
removed from service
Supplemental loads not to exceed 10 watts per monitored circuit or other
means, shall be provided to prevent conflict monitor actuation caused by
dimming or lamp burn-out Supplemental loads shall be installed on the
control side of the field terminals Conflict monitors shall include a mmimum
of one indicator light for each phase used The morntormg capacity of the
urnt shall be compatible with the controller frame size Conflict monitors
shall include a program card
7 A"Detector Panel", as specified in Standard Spec�ficat�on Section 9-
29 13(10)B, shall be mstalled The panel shall be mounted on the �nside of
the front cabinet door The detector panel shall be constructed as a single
urnt Detector switches with separate operate, test, and off positions shall be
provided for each field detector input circuit A high intensity light emitting
diode (LED) shali be provided for each switch The lamp shall energize
upon vehicle, pedestrian or test switch actuation The test switch shall
provide a spring loaded momentary contact that will place a call into the
controller When m the OFF position, respective detector circuits wdl be
disconnected In the operate position, each respective detector circuit shall
operate normally Switches shall be provided on the panel with labels and
functions as follows
a
0
D�splay On — Detector indicator lights shall operate consistent
with their respective switches
Display Off — detector indicator lights shall be de-energized
A means of disconnectmg all winng entering the panel shall be provided
The disconnect shall include a means to �umper detection calls when the
display panel is disconnected All switches on the panel shall be marked
with its associated Plan detector number All markers shall be permanent
8 Insulated terminal blocks of su�cient number to provide a termination for all
field wirmg A minimum of 12 spare terminals shall be provided Field wire
connection terminal blocks shall be 600 volt, heavy duty, barner type,
except loop detector lead-ms, which may be 300 volt The 600 volt type
terminal strips shall be provided with a field-side and a control-side
connector separated by a marker stnp The 300 volt type shall have a
marker strip, mstalled on the right side of vertical terminal strips or below
honzontal terminal strips The marker strip shall bear the circuit number
indicated in the plans and shall be engraved Each connector shall be a
screw type with No 8 post capable of accepting no less than three 12 AWG
wires fitted with spade tips
9 A vent fan with ad�ustable thermostat The mmimum CFM rating of the fan
shall exceed three times the cabinet volume
10 VACANT
11 All wiring withm the cabinet, exclusive of wirmg installed by the signal
controller manufacturer, shall have insulation conforming to the
requirements of Section 9-29 3 Cabinet wiring shall be trimmed to elimmate
all slack and shall be laced or bound together with nylon wraps or
equivalent All terminals, shall be numbered and permanently identified with
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 93
' Revised 8/27/13
a
PVC or polyolefin wire marking sleeve consistent with the cabmet wirmg
diagram provided by the signal controller manufacturer and the Contract
The cabinet will be completely wired so that the only requirement to make a
field location completely operational is to attach field power and ground
wiring Internal cabmet wiring shall not utilize the field side connections of
the termmal strip intended for termination of field wires
12 Cabmet wiring diagram and component wirmg diagrams meetmg the
requirements of 9-2913(7) shall be furnished with each cabinet Each
cabinet shall be equipped with a, shelf mounted roll out drawer mounted
directly below the controller to house one or more cabinet wiring diagrams
The cabinet wiring diagram shall indicate and identify all wire terminations,
all plug connectors, and the locations of all equipment in the cabinet
Included in the diagram shall be an intersection sketch identifying all heads,
detectors, and push buttons, and a phase diagram
13 Each vehicle detector amplifier, video detection
call isolation unit, phase selector, discrimmator,
identified with semi-permanent stick-on type label
shall be included
a Vehicle DetectorAmplifier Channel
Loop number
2 Assigned phase(s)
b Ped Call Isolation Urnt
Push button number
2 Assigned phase(s)
c Load Switches
Signal head number
2 Assigned phase(s)
d Phase Selectors
Circuit Letter
2 Phase(s) called
�
f
'
'J
�
�
C I
�
The label shall be placed on the face of the unit It shall not block any switch, light, or
operational words on the urnt The lettering on this label shall be neat, legible, and '
easily read from a distance of approximately 6-feet
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Revised 8/27/13
�
'
output channel pedestrian '
and load switch shall be
The following information
,
�
�
Page 94
'
�
9-29.13(10)B Auxiliary Equipment for Type 170E, 2070 Assemblies
, The following requirements apply to required auxiliary equipment furnished with Type
170E, 170E-HC-11 and 2070 controllers
�
'
�
'
'
'
A Flashers, flash transfer relays, conflict monitor, AC isolators, DC isolators,
discrimmator modules, program modules, modem modules, breakers,
buses, police panel switches, receptacle requirement, vent fan and auxiliary
control panel switches shall conform to the requirements noted in the TEES
B Flashing operation shall conform to Sectian 9-29 13(5), except the 6-second
flash period described in Item 2 of that section will not be required
Emergency preemption shall conform to Section 9-29 13(6)
C Input and output termmals shall be installed with a marking stnp with field
wire numbers noted in the Contract embossed on the strip All cabinet and
field conductor shall have a PVC or polyolefin wire marking sleeve mstalled,
matching the input and output terminals above Marking on sleeves shall be
embossed or type written
D The input panel terminal blocks TB 2 through TB 9 and associated cable to
the input files as described in the TEES shall be provided in all control
assemblies
E Supplemental load resistor, not less than 2000 ohms and not greater than
' 5000 ohms not to exceed 10 watts per monitored circuit, shall be provided
to prevent conflict monitor actuation caused by dimming or lamp burn-out
�
�
�
�
�J
'
�
'
'
'
An individual supplemental load resistor shall be installed withm the output
file, and shall be installed on each of the following terminal circuits
FT1-105 SP 4P-Y FT1-111 SP 8P-Y FT2-114 SP 2P-Y FT2-120 SP 6P-
FT2-117 SP 3-Y FT2-118 SP 3-G FT2-123 SP 7- FT2-124 SP 7-G
FT3-126 SP 1- FT3-127 SP 1-G FT3-132 SP 5-Y FT3-133 SP 5-G
F Load switches of sufficient quantity to fully populate the output files shall
conform to TEES and shall have indicator lights on input and output circuits
G A detection panel, which shall be constructed as a smgle unit Detector
switches with separate operate, test, and off positions shall be provided for
each field detector input circuit A high intensity light emitting diode (LED)
shall be provided for each switch The lamp shall energize upon vehicle,
pedestrian or test switch actuation The test switch shall provide a sprmg
loaded momentary contact that wdl place a call mto the controller When in
the OFF position, respective detector circuits will be disconnected In the
operate position, each respective detector circuit shall operate normally
Switches shall be provided on the panel with labels and functions as
follows
a D�splay On — Detector indicator lights shall operate consistent
with their respective switches
b Display Off — detector indicator lights shall be de-energized
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 95
Revised 8/27/13
A means of disconnectmg all wiring entenng the panel shall be provided
The disconnect shall include a means to �umper detection calls when the
display panel is disconnected All switches on the panel shall be marked
with its associated Plan detector number All markers shall be permanent
H A"Detector Termmation and InterFace Panel" shall be provided When
viewing the cabinet from the back, the panel shall be located on the upper
left hand side of the cabinet The panel shall be electrically located befinreen
the "detection Panel" and the C-1 connector The panel shall utdize
insulated terminal blocks and each connector shall be a screw type with
post
Each switchpack socket shall have pin 11 common to Nutral
J The AC input Service Panel Assembly (SPA), line voltage fdter, transient
surge protection and all neutral bus bars and equipment ground bus bars
shall be on the right side of the cabinet, mounted no more that 18 inches
from the bottom of the cabinet when viewed from the rear, and meet the
requirements described in TEES
K The PED yellow terminals on the CMU edge connector shall be extended
with a 2 foot wire, coded, heat shnnk tipped and labeled for the correct
corresponding terminal as CH-13Y/CMU-8, CH-14Y/CMU-11, CH-
15Y/CMU-K, CH-16Y/CMU-N
L An "Absence Of Red Programming Assembly" shall be provided There shall
be provided on the back panei of the output file, 17 accessible �umper plug
attachment areas, made up of three male pins per position (one, for each
conflict morntor channel and one for red enable function) Each �umper plug
shall be a two position connector, It shall be possible, by inserting and
positioning one of the 16 connectors on the right finro pins on the monitor
board, to apply 120 VAC into a corresponding channel of the conflict
monitor red channels The connection between the red morntor board and
the conflict monitor shall be accomplished via a 20 pin ribbon cable and the
industry standard P-20 connector that attaches on the front panel of the
monitor It shall be possible, by inserting and positioning one of the 16
�umper plugs on the two left pins on the monitor board, to enable the
corresponding channel to monitor for red fault by the conflict monitor There
shall be installed on the red monitor board a red fad monitor disable function
that controls the 120 VAC red enable signal mto the conflict monitor Durmg
stop-and �o operation, 120VAC is sent via pin #20 on the P20 connector to
enable red fadure monitoring on the conflict morntor by having the connector
moved to the side labeled "Red Enable" If this is disengaged by moving the
connector to the side labeled "Red Relay", then 120VAC is removed from
pin #20, and the conflict morntor wdl no longer monitor for red fad faults The
red enable function will also be wired such that if the traffic signal is in
cabinet flash, then there will be no voltage on pin #20, and the conflict
monitor wdl not monitor for red fail faults
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 96
Rewsed 8/27/13
'
�
'
'
��
�
�
M Each cabinet shall be provided with at least 20 empty neutral connections
to accommodate field wiring The neutral bus bars shall be of the style in
which a lug is not needed to be applied to the neutral field wire(s) All of the
neutral bars shall be secured in accordance with the TEES All neutral bars
shall be at the same electrical potential
N The main breaker on the SPA shall be provided with a cover to prevent
accidental tripping The cover shall be removable and replaceable without
the use of tools VACANT
O Equipment Branch Breaker —The duplex receptacle on the rear of either
PDA #2L or 3L shall be wired in parallel with the ground fault current
interrupt receptacle on the front of the power supply The ground fault
current mterrupt receptacle being in the "TesY' mode shall not remove power
to the rear receptacle
9-29.13(10)C NEMA Controller Cabinets
Each NEMA traffic controller shall be housed in a weatherproof cabinet conformmg to
the following requirements
1 Construction shall be of 0 073-inch minimum thickness series 300 stainless
' steel or 0 125 minimum thickness 5052 H32 ASTM 6209 alloy aluminum
The stainless steel shall be annealed or one-quarter-hardness complying
with ASTM A666 stainless steel sheet Cabinets may be finished inside with
' an approved finish coat of exterior white enamel If no other coatmg is
specified m the Contract Provisions the exterior of all cabinets shall be bare
metal All controller cabinets shall be furnished with front and rear doors
�
�
J
'
��I
'
�
�
�
�
2 The cabinet shall contain shelvmg, brackets, racks, etc , to support the
controller and auxiliary equipment All equipment shall set squarely on
shelves or be mounted in racks and shall be removable without turnmg,
tdting, or rotating or relocating one device to remove another A 24 slot rack
or racks shall be installed The rack(s) sha11 be w�red for 2 channel ioop
detectors and as follows Slots 1& 2 phase 1 loop detectors Slots 3, 4, & 5
phase 2 loop detectors Slots 6& 7 phase 3 loop detectors Slots 8, 9, & 10
phase 4 loop detectors Slots 11 & 12 phase 5 loop detectors Slots 13, 14,
& 15 phase 6 loop detectors Slots 16 & 17 phase 7 loop detectors Slots
18, 19 & 20 phase 8 loop detectors Slot 21 upper phase 1 loop detector
Slot 21 lower phase 5 detector Slot 22 wired for a 2 channel d�scriminator
channels A, C Slot 23 wired for a 2 channel discrimmator, channels B, D
Slot 24 wired for a 4 channel discr�minator, wired for channel A, B, C, and D
All loop detector slots shall be wired for presence/pulse detection/extension
If an external power supply is required m order for the entire racks(s) to be
powered it shall be installed All rack(s) slots shall be labeled with engraved
identification strips
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 97
' Rewsed 8/27/13
3 Additional detection utdizing the "D" connector shall be installed in
accordance with the Contract The cabmet shall be of adequate size to
properly house the controller and all required appurtenances and auxdiary
equipment m an upright position with a clearance of at least 3-inches from
the vent fan and filter to allow for proper air flow In no case shall more than
70 percent of the cabinet volume be used There shall be at least a 2-mch
clearance between shelf mounted equipment and the cabinet wall or
equipment mounted on the cabinet wall
4 The cabinet shall have an air intake vent on the lower half of the front door,
with a 12-inch by 16-inch by 1-inch removable throw away filter, secured in
place with a spring-loaded framework
5 The cabinet door(s) shall be provided with
a Cabinet doors shall each have a three point latch system Locks shall
be spring loaded construction locks capable of accepting a Best 6 pin
core A 6 pin construction core of type (blue, green, or Red) specified in
the contract shall be installed in each core lock One core removal key
and two standard keys shall be mcluded with each cabinet and
delivered to the Engmeer
b A police panel assembly shall be installed in the front door and shall
have a stainless steel hinge pin and a police panel lock Two police
keys with shafts a minimum of 1�/4-inches long shall be provided with
each cabmet
c
C'
All doors and police panel door shall have one piece, closed cell,
neoprene gaskets
A two position doorstop assembly
6 Fluorescent fixtures or LED light strips (only one type per cabinet) for
cabinet lighting Color temperature shall be 4100K (cool white) or higher
Fluorescent fixtures shall use 12 inch (nominal), 8W, type T5 shatterproof
tubular bulbs LED light strips shall be approximately 12 mches long, and
have a mmimum output of 320 lumens Lightmg shall be ceding mounted
and oriented parallel to the door face Lighting shall not interFere with the
proper operation of any other ceiling mounted equipment All lighting
fixtures shall energize whenever any door is opened Each door switch shall
be labeled "Light"
9-29 13(10)D Cabinets for Type 170E and 2070 controllers
Type 170E and 2070 controllers shall be housed in a model 332L cabinet unless
specified otherwise in the contract Type 332L cabinets shall be constructed in
accordance with TEES with the following modifications
Each door shall be furnished with the equipment listed m Standard
Specrfications 9-29 13{10}C item 5 above
2 The cabinet shall be furnished with auxiliary equipment described in
Standard Specification 9-29 13(10)B
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 98
Revised 8/27/13
�
�
'
�
�
'
�
'
,
'
'
'
'
i
�
'
,
C
3 The cabmet shall be fabricated of stainless steel or sheet aluminum in
accordance with Sectian 9-29 13(1 Q)C, Item 1 above Painted steel, painted
or anodized aluminum is not allowed
4 A disposable paper fdter element with dimensions of 12" x 6" x 1" shall be
provided in lieu of a metal fdter The filter shall be secured in the filter holder
with a louvered aluminum cover The maximum depth of the cover shall not
be more than 0 5" inch to provide the fdter to be flush against the door No
mcoming air shall bypass the fdter element
5 Field wire terminals shall be labeled in accordance with the Field Wiring
Chart
6 Fluorescent fixtures or LED light strips (only one type per cabinet) for
cabmet lighting Ftuorescent fixtures shall use 12 inch (nominal), 8W, type
T5 tubular bulbs Tubular bulbs shall be contained within a shatterproof
lamp cover Led strips shall be approximately 12 inches long, and have a
mirnmum output of 320 lumens There shall be one fixture for each rack
within the cabinet Lighting shall be ceding mounted and oriented
perpendicular to the door face Rack mounted lights are not allowed
Lighting shall be positioned such that the fixture is centered between the
front and rear of the cabinet Lighting shall not interfere with the proper
operation of any other ceiling mounted equipment Each lighting fixture shall
energize automatically when either door to that respective rack is opened
Each door switch shall be labeled "Light"
7 One drawer shelf, as shown in the TEES
8 332D Controller Cabinet
a The 332D Controller cabinet shall have the appearance of finro Type
332 controller cabinets �oined at opposing sides The outside
Dimensions of the cabmet shall be 67" High X 48 1/2" Wide X 30 1/4"
Deep
b The right side of the cabinet, as viewed from the front, shall be
considered the Signal Control side The left side of the cabinet, when
viewed from the front, shall be considered the ITS/COMM side
c
d
e
One police access panel shall be installed on the right side of the
cabinet, as viewed from the front
Two cabinet lights shall be provided one on each side and as described
in section 9-29 13(10)D 6
Vacant
AAAENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 99
, Revised 8/27h 3
The Traffic Signal Control side of the cabinet shall contain the Traffic
Signal Controller assembly and shall be furnished with equipment as
described in the contract specifications The Traffic Signal Control side
of the cabinet shall also meet all the additional equipment requirements
of the Type 332 Signal Controller cabinet as indicated in the contract
specifications
0
The ITS/COMM side of the cabinet shall contam ITS and
Communication equipment and shall be furnished with the following
One controller shelf unit, mounted 36 inches from the bottom of the
cabinet openmg to the front of the cabinet and attaching to the
front rads of the EIA rack, shall be provided The shelf shall be
fabricated from aluminum and shall contain a rollout flip-top drawer
for storage of wiring diagrams and manuals
2 One aluminum sheet metal panel, 1/8"x 15"x 54", shall be installed
to the rear of the cabmet on the right hand (when �facmg the front)
side rading
�
3 Additional ITS and Communication equipment as described in the
Contract Plans and the ITS section of the Contract Special
Provisions
9-29.13(11) Traffic Data Accumulator and Ramp Meters
All cabinets designated for use as a traffic data or ramp meter shall be Type 334L cabinets
furnished to meet the TEES with the modifications listed in Section 9-29 13(10)D and include
the following accessories
Each cabinet shall be equipped with a fully operable controller equipped as specified
m the Contract Provisions
2 Two input files, shall be provided
3 The PDA #3L shall contain three Model 200 Load Switches 4 �
A second transfer relay, Model 430, shall be mounted on the rear of the PDA #3L and
wired as shown m the Plans
4 Police Panel shall contain only one DPDT toggle switch The switch shall be labeled �
POLICE CONTROL, ON-OFF
5 Display Panel
A. General
Each cabinet shall be furnished with a display panel The panel shali be
mounted, showing and prowdmg detection for inputs and specified controller
outputs, at the top of the front rack above the controller unit The display panel
shall be fabricated from brushed aluminum and constructed according to the
detail in the Plans
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Revised 8/27h3
'
�
t
'
�
Page 100
�
�
,
LJ
t
,
�
'
,
L�
1
,
'
�
'
,
�J
'
'
B Te�
All text on the detector panel shall be black in color and silk screened directly to
the panel except the Phenolic detector and cabinet nameplates
A nameplate for each loop shall be engraved with a'/4-mch nominal text
according to the ITS Field Wiring Charts The nameplates shall be permanently
affixed to the detector panel
C LEDs
The LEDs for the display panel shall meet the following Specifications
Case size T 1 $/
vewing angle 50° minimum
Brightness 8 Milli candelas
LEDs with RED, YELLOW or GREEN as part of their labels shall be red, yellow
or green in color All other LEDs shall be red All LEDs shall have tinted diffused
lenses
D Detector panel Control Switch
Each display panel shall be equipped with one detector display control switch on
the panel with labels and functions as follows
ON
Detector panel LEDs shall operate consistent with their separate switches
OFF
All detector indicator LEDs shall be de-energized Detector calls shall
continue to reach the controller
TEST
All detector indicator LEDs shall illummate and no calls shall be placed to
the controller
E Advance Warning Sign Control Switch
Each display panel shall be equipped with one advance warning sign control
switch on the panel with labels and functions as follows
AUTOMATIC
Sign Relay shall energize upon ground true call from controller
SIGN OFF
Sign Relay shall de-energize
SIGN ON
Sign Relay shall energize
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 101
, Revised 8/27/13
�
F Sign Relay
The sign relay shall be plugged into a socket installed on the rear of the display
panel The relay shall be wired as shown in the Plans The relay coil shall draw
(or sink) 50 milliamperes f 10% from the 170E/HC11 controller and have a
DPDT contact rating not less than 10 amperes A 1 N4004 diode shall be placed
across the relay coil to suppress voltage spikes The anode terminal shall be
connected to termmal #7 of the relay as labeled in the Plans The relay shall
energize when the METERING indicator LED is lit
G Detector Input Indicators
One LED and one spnng-loaded two-position SPST toggle switch shall be
provided for each of the 40 detection inputs These LEDs and switches shall
function as follows
TEST
When the switch is m the test position, a call shall be placed to the controller
and energize the associated LED The switch shall automatically return to
the run position when it is released
RUN
In the run position the
the controller
L�
'
'
,
�
�
LEDs shall dluminate for the duration of each call to
8
H Controller Output Indicators
The display panel shall contam a series of output indicator LEDs mounted below
the detection indicators The layout shall be according to the detad in the Plans
These LEDs shall dluminate upon a ground true output from the controller via the
C5 connector
The output indicator LEDs shall have resistors m series to drop the voltage from
24 volts DC to their rated voltage and limit current below their rated current The
anode connection of each LED to +24 VDC shall be wired through the resistor
I. Connectors
Connection to the display panel shall be made by three connectors, one pin
(labeled P2) and one socket (labeled P1) and one labeled C5 The P1 and P2
connectors shall be 50-pin cannon D series, or equivalent 50 pin connectors and
shall be compatible such that the two connectors can be connected directly to
one another to bypass the mput detection Wiring for the P1, P2 and C5
connectors shall be as shown in the Plans
The Contractor shall install wire connectors P1, P2, C1 P, C2, C4, C5 and C6
according to the pin assignments shown in the Plans
6 Model 204 Flasher Unit
Each Model 334 ramp meter cabinet shall be supplied with one Model 204 sign
flasher unit mounted on the right rear side panel The flasher shall be powered from
T1-2 The outputs from the flasher shall be wired to T1-5 and T1-6
7 Fiber Optic Patch Panel
The Contractor shall provide and install a rack-mounted fiber optic patch panel as
identified m the Plans
AMENDMENTS TO THE 2012 STANDARD SPECtFICATIONS BOOK Page 102
Revised 8/27113
'
' Cabinet Wirmg
Terminal blocks T61 through T69 shall be installed on the Input Panel Layout and
position assignment of the terminal blocks shall be as noted in the Plans
'
�
II
�
�
�
'
L,I
I�
���
Terminals for field wiring in traffic data and/or ramp metering controller cabinet shall be
labeled, numbered and connected in accordance with the following
Termmal Block Pos Terminal and Wire Numbers Connection Identi�cat�on
TBS 501-502 AC Power, Neutral
T1-2 641 Sign on
T1-4 643 Sign off
T1-5 644 Flasher Output NC
T1-6 645 Flasher Output NO
T4-1 631 Lane 3- Red
T4-2 632 Lane 3— Yellow
T4-3 633 Lane 3— Green
T4-4 621 Lane 2- Red
T4-5 622 Lane 2- Yellow
T4-6 623 Lane 2— Green
T4-7 611 Lane 1— Red
T4-8 612 Lane 1— Yellow
T4-9 613 Lane 1— Green
Loop lead-in cables shall be labeled and connected to cabmet terminals according to the
' ITS Field Wiring Chart This chart will be provided by the Engineer within 20 days of the
Contractor's request
,
u
'
�
'
'
�
9-29 13(12) ITS cabinet
Basic ITS cabinets shall be Model 334L Cabinets, unless otherwise specified m the Contract
Type 334L Cabinets shall be constructed in accordance with the TEES, with the following
modifications
1 The basic cabinet shall be furnished with only Housing 1 B, Mounting Cage 1,
Service Panel #1, a Drawer Shelf, and Controller Unit Supports Additional
equipment may be specified as part of the cabinet function-specific standards
2 Housing aluminum shall be 5052 alloy with mdl finish Painted or anodized aluminum
is not allowed
3 The door air fdter shall be a disposable paper filter element of at least 180 square
inches
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 103
Rewsed 8/27/13
4 Locks shall be spring loaded construction core locks capable of accepting a Best 6-
pin core A 6-pin construction core of the type (Blue, Green, or Red) specified in the
Contract shall be mstalled in each core lock One core removal key and two standard
keys (properly marked) shall be included with each cabinet and delivered to the
Engineer upon Contract completion
5 Each cabinet shall include a 120VAC electric stnp heater with a ratmg of 100 watts,
which shall be thermostat controlled The heater strip shall be fed by wire with a
temperature rating of 400°F or higher, and shall be shielded to prevent contact with
wiring, equipment, or personnel If the heater thermostat is separate from the fan
thermostat, the heater thermostat must meet the same requirements a++++s the fan
thermostat as defined in TEES
6 Fluorescent fixtures or LED light strips (only one type per cabmet) for cabmet lighting
Color temperature shall be 4100K (cool white) or higher Fluorescent fixtures shall
use 12 inch (nominal), 8W, type T5 tubular bulbs contained within a shatterproof
lamp cover LED light strips shall be approximately 12 inches long, and have a
minimum output of 320 lumens There shall be finro fixtures for each rack within the
cabinet Lightmg shall be ceding mounted and oriented parallel to the door face — rack
mounted lighting is not permitted Lighting shall not interfere with the proper
operation of any other ceiling mounted equipment All lighting fixtures above a rack
shall energize whenever either door to that respective rack is opened Each door
switch shall be labeled "Light"
7 Each cabinet shall be equipped with a power distribution assembly (PDA) mounted in
a standard EIA 19-inch (ANSI/EIA RS-310-C) rack utdizing no more than five Rack
Mounting Urnts (RMU) (8 75 mches) The PDA shall include the following equipment
a
f�
[«
0
One duplex NEMA 5-15R GFCI receptacle on the front of the PDA
Four duplex NEMA 5-15R receptacles on the rear of the PDA These
receptacles shall remain energized on a trip or fadure of the GFCI
receptacle
Four 1 P-15A, 120VAC EquipmenUField Circuit Breakers
Line filter meeting the requirements of 9-29 13(10)A d
PDA components shall be mounted in or on the PDA such that they are readdy
accessible, provide dead front safety, and all hazardous voltage points are
protected to prevent inadvertent contact
8 Service Panel #1 shall include a service terminal block labeled "TBS", a Tesco TES-
10B or equivalent surge suppressor connected to provide power in line surge
suppression, and a 1 P-30A Main Breaker The Service Panel Assembly (SPA) shown
in the TEES shall not be included
9 Each cabmet shall mclude a rack mounted fiber optic patch panel of the type '
specified in the Contract
Cabinet drawings and wiring diagrams shall be provided m the drawer shelf Additionally, an '
electrornc (PDF format) copy of all drawings and wiring diagrams shall be provided
��
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 104
Rev�sed 8/27/13 �
�
l_!
�
'
�
'
'
�,J
'
'
'
9 Conventional Optical System
This section's title is revised to read
9-29.16(1)A1 Non-LED Opt�cal System
9-29.16(1)D1 Electrical - Conventional
This section's title is revised to read
9 Electrical — Non
9-29.20 Pedestrian Signals
This section is revised to read
Pedestrian signals shall be Light Emitting Diods (LED) type
The LED pedestrian signal module shall be operationally compatible with controllers and
conflict monitors The LED lamp urnt shall contam a disconnect that wdl show an open switch
to the conflict monitor when less than 60 percent of the LEDs m the unit are operational
The Pedestnan signal heads shall be on the QPL or the Contractor shall submit a
Manufacturer's Certificate of Compliance, in accordance with Standard Specification 1-06 3,
with each type of signal head The certificate shall state that the lot of pedestrian signal heads
meet the followmg requirements
1 All pedestrian signal heads shall be a Walk/Don't Walk module with a countdown
display
2 All pedestrian displays shall comply with the MUTCD and ITE publication ST 011 B,
�!T'CSH2 or current ITE Specification and shall have an mcandescent appearance
The Contractor shall provide test results from a Nationally Recognized Testing
Laboratory documenting that the LED display conforms to the current ITE and the
following requirements
, a All pedestrian signals supplied to any one pro�ect shall be from the same
manufacturer and type but need not be from the same manufacturer as the
vehicle heads
�
i'��
��
�
LI
'
b Each pedestnan signal face shall be a smgle urnt housing with the signal
indication size, a nommal 16 inch x 18 inch with side by side symbol messages
with countdown display
c Housings shall be green polycarbonate or die-cast aluminum and the aluminum
housings shall be pamted with two coats of factory applied traffic signal green
enamel (Federal Standard 595-14056) All hinges and latches and interior
hardware shall be stainless steel
3 Optical units for traffic signal displays shall conform to the following
a Pedestrian "RAISED HAND" and "WALKING PERSON" modules shall be the
, countdown display type showing the time remaining in the pedestrian change
interval When the pedestrian change interval is reduced due to a programmmg
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 105
' Revised 8/27/13
change, the display may continue to show the previous pedestrian change
interval for one signal cycle During the followmg pedestrian change interval the
countdown shall show the revised time, or shall be blank In the event of an
emergency vehicle preemption, during the followmg two cycles, the display shall
show the programmed pedestnan change interval or be blank In the event the
controller is put in stop time during the pedestrian change interval, dunng the
following finro cycles the display shall show the programmed clearance or be
blank In the event there is radroad preempt during the pedestrian change
interval, dunng the followmg finro cycles the display shall show the programmed
clearance or be blank Light emitting diode (LED) light sources having the
incandescent appearance are required for Portland Orange Raised Hand and
the Lunar White Walking Person
4 LED displays shall conform to the following
a
b
c
d
Wattage (Maximum) Portland Orange Raised Hand, 15 watts Lunar White
Walking Person, 15 watts
Voltage The operating voltages shall be befinreen 85 VAC and 135 VAC
Temperature Temperature range shall be -35° F to +165° F
LED pedestrian heads shall be supplied with Z crate visors Z crate visors shall
have 21 members at 45 degrees and 20 honzontal members
9 LED Pedestrian Displays
This section is deleted
9-29.20(2) IVeon Grid Type
This section is deleted
9-29.24 Service Cabinets
In the first paragraph, the lettered items A-J are re-lettered to read B-K respectfully
The first paragraph is supplemented with the following new lettered item
A Display an arc flash warning label that meets the requirements of ANSI Z535
9-29.25 Amplifier, Transformer, and Termenal Cabinets
In item No 2 C,"Transformer 23 1 to 12 5 KVA" is revised to read "Transformer 3 1 to 12 5 KVA"
and the height column value of 40" is revised to read "48"
The first and second sentences in the first paragraph are revised to read
Amplifier and terminal and transformer cabmets shall be NEMA 3R and the following
Item number 5 is revised to read
5 All cabinets shall provide a gasketed door flange
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 106
Rev�sed 8/27/13
'
� _J
�
,
�
'
Item number 7 is revised to read
7 Insulated terminal blocks shall be 600 volt, heavy-duty, barrier type The terminal blocks
shall be provided with a field-side and a control-side connector separated by a marker
strip One spare 12-position msulated terminal block shall be installed in each terminal
cabinet and amplifier cabinet
Item number 8 is revised to read
8 Each non-pad mounted Terminal, Amplifier and Transformer cabinet shall have 1/4 inch
dram holes in back corners Each pad mounted Terminal, Amplifier and Transformer
cabmet shall dram to a sump and through a 3/8 inch diameter drain pipe to grade as
detailed in the Standard Plans
Item number 10 is revised to read
10 Transformer cabinets shall have two separate compartments, one for the transformer and
' one for the power distr�bution circuit breakers Each compartment shall be enclosed with a
dead front Each breaker shall be labeled with the device name by means of a screwed or
riveted engraved name plate
�
�
,
,
'
Section 9-34, Pavement Marking Material
August 5, 2013
9-34.2 Paint
The second paragraph is revised to read
Blue and black paint shall comply with the requirements for yellow paint in Section 9-34 2(4)
and Section 9-34 2(5), with the exception that blue and black paints do not need to meet the
requirements for titanium dioxide, directional reflectance, and contrast ration
9-34.3(4) Type D— Liquid Cold Applied Methyl Metharcrylate
The column headings m the table titled "98 2 Formulations Type D— Liquid Cold Applied Methyl
Methacrylate" are revised to read
98 2 Formulations Type D— Liquid Cold Apphed Methyl Methacrylate
'
'
1
'
L_J
'
Property
Test Method
D-3 � D-4 � D-5 � D-6
Mm Max Mm Max Mm Max Mm Max
Section 9-36, Shaft-Related.Materials
August 5, 2013
9-36.1(1) Permanent Casing
This section is revised to read
Permanent casing shall be of steel base metal conforming to ASTM A 36, ASTM A 252 Grades
2 or 3, ASTM A 572, orASTM A 588
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 107
' Rewsed 8/27/13
I_ _J
,
'
C;
�
���I
�
CJ
'
�
�
'
�
�
'
'
'
LJ
�
�
PART III
SPECIAL PROVISIONS
u
�
�
�J
'
�
TABLE OF CONTENTS
INTRODUCTION TO THE SPECIAL PROVISIONS .. ...... ... . . .. .. ...... .. ...... ..................Ill-1
DIVISION 1 GENERAL REQUIREMENTS ............ ..... ......... .. ..... .. ...... ... .. .........III-3
DESCRIPTIONOF WORK .. ............. . .. ..... ... .. .... . .. .. ....... .. ... .. . . ..... .. ............III-3
1-01 DEFINITIONS AND TERMS ... ..... .......... .. . .. ... .. .. ... .. ... .. .... . . ... . . .. .....III-3
1-01.3 DEFINITIONS ..... ..... ...................... .............. ... .. .. .... .. . .. ..I11-3
' 1-02 BID PROCEDURES AND CONDITIONS . ... .... .......... .... .. ................... .... .. ..III-7
1-02.1 PREQUALIFICATION OF BIDDERS ... .. .. ... . . .. .. .. ... .... .. . .. ......III-7
, 1-02.2 PLANS AND SPECIFICATIONS ........... .. ... ........... .... .. .. .. ........ ......III-7
1-02.3 ESTIMATED QUANTITIES ........... ... ... .... .. . .. ........... .. ...... .. .. .. . ......III-7
1-02.4 EXAMINATION OF PLANS, SPECIFICATIONS, AND SITE OF WORK. ... ..III-8
, 1-02.4(1) GENERAL ................................... .. .... .............. ................... III-8
1-02.4(2) SUBSURFACE INFORMATION . .. ... .......... . . .. .. .......... ....... . .. . . ... ..III-8
' 1-02.5 PROPOSAL FORMS ...... ....... .. . .. ............. .. .... ... ..... .. ..... . .. . ....III 9
........ Iil-8
1-02.6 PREPARATION OF PROPOSAL .......... .... ........ ..... .. .. .. ........... -
1 1-02.7 BID DEPOSIT ............. .... ... .............. ........... .. . ............. . ..................... .III-9
1-02.8 NON-COLLUSION DECLARATION AND LOBBYING CERTIFICATION .. .III-10
1-02.8(1) NON-COLLUSION DECLARATION ... .. .... ......... .. . . . ........ ... .............III-10
� 1-02.9 DELIVERY OF PROPOSAL .. ...... ............... . ............... . .. .... .. . ...... .III-10
1-02.13 IRREGULAR PROPOSALS ......... .......... ... .... . .. ................. .. . .... ....III-10
' 1-02.14 DISQUALIFICATION OF BIDDERS ... .................. .. ..... .. . .............. ...... III-11
1-02.15 PRE AWARD INFORMATION ... .. .. ........... . ................ . ......... .. ..........III-13
'
'
'
'
�
�_J
1-03 AWARD AND EXECUTION OF CONTRACT .. ... ......... ................. .... ............. ....III-13
1-03.1 CONSIDERATION OF BIDS .. ...... .. .. .... ... . .. ............ . ...... .. ....... ...III-13
1-03.3 EXECUTION OF CONTRACT ... .. ... ... .............. .. . . .... ........... .. .. .... ..III-14
1-03.4 CONTRACT BOND .... ... ........... .. .. . ...... .. ........ . .. ............. .. ... ...III-14
1-03.7 JUDICIAL REVIEW ..... ..... .. .. .. . .. ..... ........ .. . . ........ ... .... ... ... .. I11-15
1 -04 SCOPE OF WORK .............. . ....... .. .. ... . . .. .. . ... .. . . ....... .. . ... . .. .. .. .III-16
1-04.2 COORDINATION OF CONTRACT DOCUMENTS, PLANS, SPECIAL
PROVISIONS, SPECIFICATIONS, AND ADDENDA .. ..... . ... ... ....... .. .. .. ...III-16
1-04.4 CHANGES ..... .. ......... .. .. ........... ..... . ... .. ................ .......................III-16
1-04.4(1) MINOR CHANGES ..... .... .. . ......... .... ... .. .... .... ........ ... .. ..... . ..III-16
1-04.6 VARIATION IN ESTIMATED QUANTITIES .. .... .................................. ... III-17
City of Bremerton 236-1896-113 (Ol/04)
Wash►ng[on Avenue Sewer Improvements � November 2013
Cont�act Documents Table of Contenis
�
1-05 CONTROL OF WORK . ..... .. ... ..... .. . .. .... . . ... .... .. . . ..... ........ ........... .. .. III-17
1-05.3 PLANS AND WORKING DRAWINGS . .... . . .. ........ ... ............ .... ......III-17
1-05.4 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES... 111-18
1-05 5 SUBMITTALS (NEW SECTION) .. ... ....... ..... . .................... ........ ... .....III-19
1-05.7 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK ....... .. ..........III-26
1-05.10
1-05.11
1-05.12
1-05.14
1-05.16
1-05 17
GUARANTEES............. .................................................. ................III-26
FINAL INSPECTION ......... .. .. .......... . .... ....... . ..... ... . . .... .... ............. III-27
FINAL ACCEPTANCE ....... .. . ...... ................. ......... .......... .. ...... ......III-28
COOPERATION WITH OTHER CONTRACTORS ... ........... .. ........... ......III-28
WATER AND POWER (NEW SECTION) .... ............ ........ ...... .. ...... . ..III-28
ORAL AGREEMENTS (NEW SECTION) ..................... ........... .... .... . .......III-29
1-06 CONTROL OF MATERIAL ...... ...... .... . . .... ... ....... ....... .... ... ......... . ....... .....III-29
1-06.1 APPROVAL OF NiATERIALS PRIOR TO USE ...... ..... ... ....... .... ........II!-29
1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC .. ....... .. ....... .III-30
1-07.1 LAWS TO BE OBSERVED .. . . .. ..... . .......... . ........ ........... .. ... .........III-30
1-07.2 STATE TAXES ... ........ ..... .......... . ... ... . . .. .... .. ........ .. ... ... ... .. . ...I11-30
1-07.5 ENVIRONMENTAL REGULATIONS ............. . . ............. ......... .. ...... .. ..III-32
1-07.5(2) STATE DEPARTMENT OF 11VILDLIFE AND FISHERIES ...... .. ... .... .....III-32
1-07.6 PERMITS AND LICEIVSES ...... . .. ...... . . . . ... ...... . ...... .. ... ......... ..III-32
1-07 13 CONTRACTOR'S RESPONSIBILITY FOR WORK . ... .......... ... .. ....... ..III-32
1-07 73(1)
1-07.15
1-07 15(1)
1-07.16
1-07.16(1)
GENERAL........ ... .. .... .. ........... . ... .. . . .. ... .... .... .. . ...... . .. ... .III-32
TEMPORARY WATER POLLUTION/EROSION CONTROL .. .... ...... .. . III-33
SPILL PREVENTION, CONTROL, AND COUNTERMEASURES PLAN ... .III-33
PROTECTION AND RESTORATION OF PROPERTY .......... ... ....... ... III-34
PRIVATE/PUBLIC PROPERTY ..... ....... . ... . ........ . . ....... .. ......... .. .III-34
1-07 16(3) FENCES, MAILBOXES, IIVCIDEfVTIa►LS .... . . ............ . ......... .. .......... .III-35
1-07.17 UTILITIES AND SIMILAR FACILITIES . .. ..... . .............. ........ ... ..... .. III-35
1-07 18 PUBLIC LIABILITY AND PROPERTY DAMAGE INSURANCE ... .... ..III-37
1-07 18 INSURANCE ........... ......... ............. ........ . . .. .. . ... ........... .... ... ...... III-37
1-07.18(1) GENERAL REQUIREMENTS ........ .. .... ...... . .......... . ...... .... ........ ... . III-37
1-07.18(2) ADDITIONAL INSURED ..... . .. ..... . . . . .... .... . ..... .... ........ ....... .. ...III-38
1-07 18(3) SUBCONTRACTORS ................. .. .......... . .... . .. .... ...... .... ...I11-39
1-07.18(4) EVIDENCE OF INSURANCE . . ..... .. ..... .. . ....... .... .... .. .. .... .. . III-39
1-07.18(5) COVERAGES AND LIMITS .. ........ . ... . . . ... .. . . .... .. ............ . .. .III-39
1-07.18(5)A COMMERCIAL GENERAL LIABILITY .... . .... . .... . ......... ... . . ... . . . .. .III-39
C�ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Contrac[ Documents
�
236-1896-113(01/04) ,
November 2013
Table of Contents
'
�
'
'
,
�
ll
1-07.18(5)B AUTOMOBILE LIABILITY ....................................... ...... ... .. ............. .... NI-40
1-07.18(5)C WORKER'S COMPENSATION . ... ... .... ...... .. . ... .. ....... .. .... .. ... .... 111-40
1-07.18(5)F EXCESS OR UMBRELLA LIABILITY (NEW SECTION) . ................ ... ...III-40
1-07.18(5)G POLLUTION LIABILITY (NEW SECTION) ... ............ ...... ......... ..... ... ... III-41
1-07 23 PUBLIC CONVENIENCE AND SAFETY . . ............ .... ... . ... ... ......... .. III-41
1-07 23(1) CONSTRUCTION UNDER TRAFFIC .. .. ............ ... ..... .... . ....... .. ..........III-41
1-07.23(2) CONSTRUCTION AND MAINTENANCE OF DETOURS .. ... ............. ... ..III-44
1-07.23(3) COMMUNICATIOIWDISSEMINATION OF INFORMATION (NEW SECTI011n. .III-45
1-07 24 RIGHTS OF WAY .... ... .. ..... ... ........... . ......... ... ........ ................... ......111-45
1-07 28 POTENTIAL FOR CONTAMINATED SOILS (NEW SECTION) ... ....... ......III-46
' 1-08 PROSECUTION AND PROGRESS ... .. ... ... . ... ... ....... . . .. .. .. .... ............. . .III-49
1-08.0(1) PRECONSTRUCTION CONFERENCE (NEW SECTION) .......... ............. ..III-49
1-08.0(2) HOURS OF WORK (NEW SECTION) .. ........ . .. .... . . .. .......... ..............III-49
' 1-0$.0(3) WEEKLY CONSTRUCTION MEETINGS (NEW SECTION) .. . .... ... .. . . III-50
1-08.0(4) OTHER MEETINGS (NEW SECTION) ......... .. .. .. .. . ... .... ..... .. ...........Itl-50
, 1-08 0(5) CONSTRUCTION CONSTRAINTS AND WORK SEQUENCE (NEW SECTIONj .III-51
1-08 3 PROGRESS SCHEDULE . ................... ..... . ... .. ...... ...... ....... .. .. .. ......III-51
,
'
�
�
1
'
1
�
1-08.3(1) GENERAL REQUIREMENTS . . .............. ... ... .. ... . . ....... .............. .....111-5Z
1-08.4 PROSECUTION OF WORK .. .................. ....... ... .. ......................... ..... .. I11-52
1-08 4 NOTICE TO PROCEED AND PROSECUTfON OF WORK ..... ... ......... ......111-52
1-08 5 TIME OF COMPLETION .......... .... ... ...... . .......... .. . .. .. .. .. .. ... .... .....III-52
1-08 6 SUSPENSION OF WORK ..................... .... ....... ........ ... ..... ........ ..... ... III-53
1-08.7 MAINTENANCE DURING SUSPENSlON .. .. ..... ... ......... . .. .... ....... ..I11-53
1-08.8 EXTENSIONS OF TIME .... .... ... . .. ................... .. . . ....... ....... ... ......III-53
1-08.9 LIQUIDATED DAMAGES ........... . ....... .. ... .. ...................... ...... ... . ...III-54
1-09 MEASUREMENT AND PAYMENT ... .. .. ....... .............. ..... ........... ...... ... ..........111-54
1-09.1 MEASUREMENT OF QUANTITIES ..................... .. .. ........................... . ...III-54
1-09 6
1-09.8
1-09.9
1-09 11
1-09.11(3)
1-09.13
1-09 13(3)
1-0913(3)B
FORCEACCOUNT .. .. ...... .. ...... .... ... . ......... .... .......... .......... ... .. ... 111-56
PAYMENT FOR MATERIAL ON HAND ............... .. . .. .. . .. ... . .. ..........I{{-57
PAYMENTS.... ........... ..... ....... ....... ........... ................................III-57
DISPUTES AND CLAIMS .. .. .... .... ................... . . ...... ......... ... . ...III-58
TIME LIMITATION AND JURISDICTION . .. .. . ........................................III-58
CLAIMS RESOLUTION .. ...... ... .......... .. .. .. . ... . . ..... . ......... .......III-58
CLAIMS $250,000 OR LESS . . ... . .. ................. .. . ................. ... . ...III-58
PROCEDURES TO PURSUE ARBITRATION .. .. .. .... ..
' C�ry of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
�
.. .. . . ... .. .I I I-59
236-1896-113 (Ol/04)
November 2013
Table of Contents
4
�
1-10 TEMPORARY TRAFFIC CONTROL ..... . ... ..... . ....... .... ...... ................ . ....III-59
1-10.1 GENERAL ....... ................................... .................. .... ............. ....III-59
1-10.2 TRAFFIC CONTROL MANAGEMENT ... ........ .... . .. ... .. . ..... .. ........ .III-61
1-10.2(1) GENERAL ........... . ........ ................ ......................................III-61
1-10.2(2) TRAFFIC CONTROL PLANS ..... ....... ... ..................... ... ... . .. ... . ..... III-61
1-10.3 TRAFFIC CONTROL LABOR, PROCEDURES AND DEVICES ........... ... ..III-61
1-10.3(3) TRAFFIC CONTROL DEVICES . . . .... .. . ......... ............ ..... .. ..... ....... III-61
1-10 3(3)A CONSTRUCTION SIGNS . ... ..... . ........ . .. ...... .. ............ ..... ........ ... ...III-62
1-10.3(3)L PARKING RESTRICTION SIGNS (NEW SECTION) .... ..... .. ....... ......... III-63
1-10.3(3)M SPECIAL SIGNS (NEW SECTION) . ............... . ...... .... ............. ..... .. .III-64
1-10-4 MEASUREMENT ...................... ................. ....................................111-64
1-10.4(3) REINSTATING UNIT ITEMS WITH LUMP SUM TRAFFIC CONTROL.... . III-64
1-10.5 PAYMENT .............. .....................................................................III-64
DIVISION 2 EARTHWORK .. ....... ......... ...... .. ..... . ... .. ............ .............. ... . .......III-65
2-01 CLEARIIVG, GRUBBING AIVD ROADSIDE CLEANUP .......................... .. ... ..... ..III-65
2-01.1 DESCRIPTION . .. .............. ... . ........... .... . .... ....... ... .............. . .....III-65
2-01.2(1) DISPOSAL METHOD NO. 1- OPEN BURNING ..... .. ............................ . III-65
2-01 2(2) DISPOSAL METHOD NO 2 - WASTE SITE . .... ........ ...... ........ ... . . ....III-65
2-01 2(3) DISPOSAL METHOD NO. 3 - CHIPPIMG. ..... . ... .. .... ... .. . . ..III-65
2-01.3 CONSTRUCTION REQUIREMENTS ........ . ... . ........... ........... ........ ... III-65
2-01 3(4) ROADSIDE CLEANUP .... .. .... .. . .... .. ... . ........ ..... .......... ...... ... ...III-65
2-01.3(4) CLEANUP AND RESTORATION . .... ... . . .. . .. ...... ...... .. ........ ..... . . .111-65
2-01 3(5) TREE PROTECTION (NEW SECTION) . ... ..... ....... . ....... .. . .... .. ....... ..III-66
2-01.4 MEASUREMENT .. .. .. .. ... .. . .. ........ ..... . ... .. ....... .. .... ......... . .....III-66
2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS ... . .... .. ......... ... ... . .....III-66
2-02.1 DESCRIPTION ....... ...... .. ............ . ............. .... ............. ....III-66
2-02.3 CONSTRUCTION REQUIREMENTS .... . ... . .. .. . .. .... ... ......... .... .III-67
2-02.3(3) REMOVAL OF PAVEMENT, SIDEWALKS, CURBS, AND GUTTERS .....III-67
2-02.3(4) REMOVE/ABANDON EXISTING WATER SYSTEM (NEW SECTION)... . III-68
2-02.3(5) REMOVE/ABANDON EXISTING SEWER SYSTEM (NEW SECTION) .. ..Ilt-69
2-02.3(6) REMOVE/ABANDON EXISTING STORM SYSTEM (NEW SECTION) ......III-69
2-02 3(7) POTHOLE EXISTING UTILITY (NEW SECTION) .. ...... ... .. .... ........ ..... III-69
2-02.3(8) ADJUST EXISTING UTILITY TO GRADE (NEW SECTIONj ...... ..... .... III-70
2-02.4 MEASUREMENT ......... ......... ..... ....... ..... ... . ...... . ...... . ..... ... .. ... .III-71
2 -02.5 PAYMENT .... .. ..... ............ .... ..... ... .................... .... .. .... .....III-71
C�ty of Bremerton 236-1896-113 (01/04)
Washington Avenue Sewer Improvements 1ll-�v November 2013
Contract Documents Table of Contents
�
�
'
'
LJ
'
�
,
'
,
'
r
'
�
'
�
�l
'
2-04 HAUL ........ .......... ..... .............................. .... ................ .............III-72
2-04.5 PAYMENT . . .. ..... ... . ..... ... .. .. .... .. .... .. . ... .... ..... ..... ... ....III-72
2-06 SUBGRADE PREPARATION ... . .... ....... ....... ...... . .. ..... ....... .. ... . . .. .. .. III-73
2-06.3 CONSTRUCTION REQUIREMENTS ...... ... .. .. .. .. .... ........ ... ..... ..... ...III-73
2-07 WATERING ... ..... . ........... ................................... . ........... .. .........I11-73
2-07.3 DESCRIPTION ...... ...... ..... .......... ....... .... ................ ..... ..III-73
2-07.5 PAYMENT ....... ........ ..................................... ...... ............. .....III-73
2-09 STRUCTURE EXCAVATION ............ .... .... .. .. . . ..... ..... ........ .......... ....... ..... ... -
7
2-091 DESCRIPTION .................................... ... .... ......................... ... III-73
2-09.3 CONSTRUCTION REQUIREMENTS ... .... .......... ... ....... ...... ......... .... III-74
2-09.3(1)G TRENCH DEWATERING (NEW SECTION) .... ...... ..... ....... .... .... .... ...III-74
2-09.3(4) CONSTRUCTION REQUIREMENTS, STRUCTURE EXCAVATION,
CLASSB ..... ......... ... . ............ . . . ........ ........... .. ....... ....... .. . .... ...I II-74
2-09 3(9) REMOVAL AND DISPOSAL OF CONTAMINATED MATERIAL
(NEW SECTION) .. .. . . ........ ..... ..... . .. ... .......... .. .... ...... .. ... .... ..... III-74
2-09 4 MEASUREMENT ...... . .......... ... . .. ..... ... ....... .... ..... ... ... ... ..... .....III-75
2-09.5 PAYMENT ........... ... ................... .. ................ ... ...... ........ ...11!-75
2-11 TRIMMING AND CLEANUP ... . . .. ..... .. .. ... ... .... .... ....... .... .. .... .. . ..........111-76
2-111 DESCRIPTION ......... ........ .. ..... ............................... ...... ....III-76
2-11.3 CONSTRUCTION REQUIREMENTS . .. .. .. .......... .. .... ...... ... . .. . ... ..I11-76
2-11.3(1) ROUTINE CLEANING (NEW SECTION) . ...... ......... .... ... .... .. .. .............III-76
2-11 3(2) FINAL CLEANING (NEW SECTION) ..... .... ...... .. ........... .. ... ...... .. . ...III-77
2-11.5 PAYMENT ..................... ..... . .... ...... ... ...... .. ... .. ...... .... .. ........... ..... III-77
2-12 CONSTRUCTION GEOSYNTHETIC . .... ........... ......... .. ....... .... . ..................... . III-77
2-12.1 DESCRIPTION ... ................ .................................................... ....111-77
2-12.2 MATERIALS . . .... ... . ............... .... ... ..... . .... ...... ...... ... ... ... . .. ..III-77
2-12.3 CONSTRUCTION REQUIREMENTS ... . . .. ... ...................... ... . ....... .... III-78
2-12.4 MEASUREMENT ........ .............. ... .. . ... . .. . ..... .... . . .............. ...... .... .ill-78
2-12.5 PAYMENT .......... ..... ..... ........................... ...................................III-78
DIVISION 3 AGGREGATE PRODUCTION AND ACCEPTANCE ............ .... ..... ... ... ....III-79
3-01 PRODUCTION FROM QUARRY AND PIT SITES ........................ ....... ... ...............III-79
3-01.4 CONTRACTOR FURNISHED MATERIAL SOURCES . .. .. ... .. . .. ... ...III-79
3-01.6 PAYMENT ......... ............................... . ......... .................. .. ........III-79
236-1896-113 01/04)
C►ry of Bremerton �
Wash►ngton Avenue Sewer Improvements v November 2013
Contract Documents Table of Contents
'
DIVISION4 BASES .. . .. . ..... . ............ ......... . . . . ...... . ...... ............ ......... ..: III-81
4-04 BALLAST AND CRUSHED SURFACING .... .................. ... ..... . . ... .... .. .. .III-81
4-04.1 DESCRIPTION ............... ................... ..........................................I11-81
4-04.4 MEASUREMENT ..... .. . . ... .... ............ ... ............ ... .... ........ .... .. ... .III-81
4-04.5 PAYMENT ... ....... ............. ......... .. ......................... ... .. .. ..III-82
DIVISION 5 SURFACE TREATMENTS AND PAVEMENTS ...... ........ ..... ... ... .. ..... III-83
5-04 HOT MIX ASPHALT .. .. .... . ................. . ....... . . . ....... .......... ... .. . . .... ... ......III-83
5-04.1 DESCRIPTION ....... ........................... .....................................III-83
�
5-04.2 MATERIALS .......... ........ ...... . ...... . . ... . ... .................. . ......:........... ... III-83
5-04 3 CONSTRUCTION REQUIREMENTS ..... ............ ..... ...................... .. ........III-83
5-04.3(7) PREPARATION OF AGGREGATES .................................... ....:................III-84
5-04 3(7)A MIX DESIGN .. .................. ..... ... .. . .. ... . ..... ........... ....... ...... ... . ... III-84
5-04 3(8) MIXING ......... ...... .. .... ....... ..................... .... . ................. .. ... ....... ..III-85
5-04.3(8jA ACCEPTANCE SAMPLING AND TESTING - HMA MIXTURE ...................III-85
5-04.3(10) COMPACTION .......... ....... ............. ........ .......... ...... . .... ........III-86
5-04.3(10)B CONTROL ............................ ............................................ .... .. . ..III-86
5-04.3(17) PAVING UNDER TRAFFIC ....................... . ... ..... ........ .. ... ... ... .. ........III-87
5-04.3(18) COLD MIX (IVEW SECTIOIV) .. . ..... .. ....... ... ..... .. .. ...... ................ ...III-87
5-04.4 MEASUREMENT .. .. ............ . ...... .. ....... ................................ .......111-88
5-04.5 PAYMENT . ..................... ........................................................... ..III-88
5-05 CEMENT CONCRETE PAVEMENT ........ . . ....... . . .... .. .......... ... .. ... .... .. .......III-89
5-05.4 MEASUREMENT .. .. .. .................................... . ................... .. ..... .... . ... 111-89
DIVISION6 STRUCTURES .. .......... ..... . . .. .. .. . ........... .. .................. ....... .. . ... III-91
6-02 CONCRETE STRUCTURES . . .......... .. ........... . . .... .. ...... ... ....... ::...... .......III-91
6-02.3 CONSTRUCTION REQUIREMENTS .... . ... ......................... :::...............III-91
6-02 3(1j CLASSIFICATION OF STRUCTURAL CONCRETE ...... ... ... .... ....... .. .. III-91
6-02.3(2) PROPORTIONING MATERIALS ........... . ... ..... ... .. ....... ... . . .. .. ..III-91
6-02.3(2)A CONTRACTOR MIX DESIGN . ..... ...... . . . . .... ............. .... ... ... ..... .. ...III-91
6-02.3(3) ADMIXTURES ........ .................................. .................... ........ . .111-91
6-02.3(4) READY-MIX CONCRETE .... . . . .... .. . ...... .................. . .......... .. . .....III-91
6-02.3(4)C CONSISTENCY ........... .......................... .................. ................ III-91
6-02.3(5) ACCEPTANCE OF CONCRETE ... ..... . ....... . .................... ............. .. III-92
C�ty of Bremerton 236-1896-113 (01/04)
Wash�ngton Avenue Sewer Improvements 111-v� November 2013
Contract Documents Table of Contents
'
,
'
'
�
�
'
,
'
'
�
�
'
L J
DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS,
WATER MAINS, AND CONDUITS . . . .. ........ .. .. . . . .. .. .. ..... ..... . . ..III-93
7 -04 STORM SEWERS . . ..... . ...... ...... .... ...... .... ... ...... .... .. .............. . .. .... . III-93
7 -04.1 DESCRIPTION .. . ....... .... ..... ..... .. .. ........ .... ..... ........... ... .. ... .....III-93
7 -04.2 MATERIALS ....................... ........ .. ........ ......... ....... ............ .III-93
7-04.3 CONSTRUCTION REQUIREMENTS . . . ............ .... ... .. ...... .. ... ... ... .....III-93
7-04.3(1) CLEANING AND TESTING ........... ... .... .... .... ..................... .... .. .. .. ..III-93
7-04.3(2) CONNECTIONS TO EXISTING CATCH BASINS AND STORM LINES
(NEW SECTION) ... .. . ...... .... ....... . ... ........ . .. ....... ...... . ... ....... .....III-93
7-04.4 MEASUREMENT . .... .... ...... ............. ... ............ ... ......... ...... .... . ..III-94
7 -04.5 PAYMENT ................. ................. .... ........................ .. ......... ..III-94
7-05 MANHOLES, INLETS, CATCH BASINS, AND DRYINELLS .... ............... ...........III-94
7 -05.2 MATERIALS ..... ... . .......... ............................................. ..... ...III-94
7-05.3 CONSTRUCTION REQUIREMENTS ....... ...... ......... ....... ..... ........... . ...III-95
7-05.3(6) MANHOLE LINING WITH EPDXY SPRAY COATING (NEW SECTION). ...III-95
7-05.3(6)A DESCRIPTION ... .............. ... ........................................... ............III-95
7-05.3(6)B REFERENCES .... . . ......... ...... .............................. ................III-95
7-05.3(6)C SUBMITTALS . ..... ......... ........... ................. ..................... .III-96
7-05.3(6)D QUALITY ASSURANCE . .. . ......... .. .... .. ..... ... ........... .. ... . ........ ..III-96
7-05.3(6)E DELIVERY, STORAGE, AND HANDLING .......... ... ....... ..... .. .............. ....III-97
7-05.3(6)F SITE CONDITIONS .... . . .. .. .. . ......... ... ........ ... .... .. . . ........... ..... . . III-97
7-05.3(6)G WARRANTY ... . .......................... ................ ............ .......III-97
7-05 3(6)H REPAIR MATERIALS .... ... .... ... .. . ......... .......... .. ...... .. ... .. .......III-97
7-05.3(6)I PROTECTIVE COATING MATERIAL ........ ... ........... .......... ...... .. ........III-98
7-05.3(6)J APPLICATION OF MATERIALS ......... .. ... .... .... ..... ......... ........... . .. ....III-98
7-05.3(6)K APPLICATION OF PROTECTIVE COATING .. ....... ... .. .. ......... .. .....III-100
7-05.3(6)L TESTING AND INSPECTION ...... .. .. ...... ........ ... .............. . ....... . .. . III-100
7-05.4 MEASUREMENT ... .... . .. ........ . ...... .. .. ... .............. ......... . .. ..111-101
7-05.5 PAYMENT ......... . ..... .. ... ......................... .. .. ............ ........III-101
, 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS ........ . ... .... ......... ... .......III-102
7 -08.2 MATERIALS ........ . ............................... ..... .. . ......... ........III-102
' 7-08 3 CONSTRUCTION REQUIREMENTS ... .... . .... . .. ... .. . ...... . . .. .III-102
7-08 3(1) EXCAVATION AND PREPARATION OF TRENCH ......... ...... .. .... III-103
7-08.3(1)A TRENCHES . ........... . . ... ....... ......... . ... .......... ..... .. ...... .. .. .III-103
� 7-08.3(1)D TRENCH DEWATERING (NEW SECTION) . ........ ...... . ..... ....... ..... ..III-103
' C�ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements vu November 2013
Contract Documents Table of Contents
�
7-08.3(3)
7-08.3(3)A
7-08 3(4j
7-08.4
7-08.5
BACKFILLING . .......... .. ......... ........ . . . . . ..... ................... ... ........ ...I11-103
VERTICAL CLEARANCE BETWEEN UTILITY LINES (NEW SECTION) .I11-104
PLUGGING EXISTING PIPE . . .. ....... . . .. ............. . ...... ....... . . . . . .. III-104
MEASUREMENT .... ... ... .. . .. .. ..... . . .... ............ ..... .. ... ...III-104
PAYMENT...... .. .. .. ......... .... ........ . ................... .... ....... .. .... ...III-105
7-09 WATER MAINS ........ ... ... ........ ... .... .... ...... . ............. ................... .. ........III-106
7-091 DESCRIPTION .................... ............. .. .............. ......... .. .......111-106
7-09.2 MATERIALS . ................................................ .............................III-106
7-09.3 CONSTRUCTION REQUIREMENTS ... . . .................. ...... ....... ....... ...III-106
7-09.3(7) TRENCH EXCAVATION . ...... .. . ..... .. .. . . ..... ......... .... ........ .... .. III-107
7-09.3(19) CONNECTIONS .......................................... .......................... ......III-108
7-09 3(19)A CONNECTIONS TO EXISTING MAINS . ... . . . .. .... .. .. ..... ... .. .. . . III-108
7-09.3(21) CONCRETE THRUST BLOCKING . . ... . . . ... ............................. ........ . III-108
7-09.3(23) HYDROSTATIC PRESSURE TEST . . . . . .. . . . . ..... ... .... ........ ...... III-108
7-09.3(23)A TESTING EXTENSIONS FROM EXISTING MAINS ...................................III-109
7-09.3(24) DISINFECTION OF WATER MAINS ...... .. .... . . ... . ... .. .. .. .... .. .. ...III-109
7-09.3(24)A FLUSHIIVG .......................... . .... ..................................... . ...III-109
7-09.3(24)N FINAL FLUSHING AND TESTIIVG . . ... ...... ... . .... .. ...... ... ... ... .. ....III-110
7-09.4 MEASUREMENT ............ .. .... ..... . . . . . .. . .. . . ..... ........................ . III-110
7 -09.5 PAYMENT .. .. .. ... . ................ .... . ..... ...... ... . ...... ............. ... . .... ...III-110
7-12 VALVES FOR WATER MAINS ........... .. . .. . ..... . ... . ..................... .... .......III-111
7-12.2 MATERIALS . ..... ........... .... ...... . . . ........................... ...III-111
7-12 3 CONSTRUCTION REQUIREMENTS .. . ...................................... .. III-111
7-12.4 MEASUREMENT ................ .. ............... .................................III-111
7-12.5 PAYnflEiVT .................................. .. . . . ..............................III-112
7-14 HYDRANTS ...... .. ... ...... ........... ... .... . . ...... . . . ......... .... ................... . 111-112
7-14 2 MATERIALS . .. .. ........... .. .. . ... .. .. ........ ..... ... ................ III-112
7-14 3 CONSTRUCTION REQUIREMENTS . . . . ... .... ..... .. .......................III-112
7-14.3(1) SETTING HYDRANTS . .. ............ ... .... . . . ..... . ... ... ........ .............. ...III-112
7-14 4 MEASUREMENT ..... . .. ....... ... ... .... . . .......... ..... ..................... ..... .III-113
7-14.5 PAYMENT . ................ ...... ............ .............................. ..... .... .III-113
7-15 SERVICE CONNECTIONS . .. . .......... .... ........ . ................... ... .........................III-113
7-15.1 DESCRIPTION ............... .... ........ . ............. .............. ... .....III-113
7 -15 2 MATERIALS ...... ..... .............. ... ... ... .............. ........................ ..... .......III-114
City of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements 111-wu November 2013
Contract Documents Table of Contents
�
LJ
�
�
'
,
�
'
�
LI
,
7-15.3 CONSTRUCTION REQUIREMENTS .............. .. . . .. ......... . .. ... .. .. .III-114
7-15.3(1) FLUSHWG AND DISINFECTION ..... .... ........ . .. ......... .......... ..... .. III-115
7-15.4 MEASUREMENT . .... ...... . .. . . .. ........... . .. .. .. ...... .. ..... .. .... . .III-116
7 -15.5 PAYMENT ..... ............... ............... ........ .. .. ... ..... ............ III-116
7-17 SANITARY SEWERS .. . . ...... ....... .... . .. . . .. ....... ..... .. .............. ... ..... .. III-116
7 -17.1 DESCRIPTION . .......... .. .. ............ . .. . ....... ...... .. .............. .. .... .. .I11-116
7-17.2 MATERIALS . ........... ................... ........ ........................ .... ...III-117
7-17.3 CONSTRUCTION REQUIREMENTS ... .. .. ... ....... . .. .. ... ........... III-117
7-17 3(1) PROTECTION OF EXISTING SEWERAGE FACILITIES . ... ........... ... .III-117
7-17 3(1)A MAINTAINING SEWER SERVICE (NEW SECTION) . ..... . .. ... .. . .. .. .III-117
7-17 3(1)B MAINTAINING SEWER SERVICE OF LATERALS (NEW SECTION) ... III-117
7-17 3(4) LOW PRESSURE SEWER VALVES (NEW SECTION) ........... ... .... ....III-117
7-17.3(3) SLIP-LINING (NEW SECTION) ....... .... . ..... . ..... .. .. . .. . ...... .. . .. . . I11-118
7-17 4 MEASUREMENT ......... ..... . ....... ..... ... ... ............. . ....... .. ... .... .. III-119
7-17 5 PAYMENT ................ ... .............. .......... .... . ............ ........ ...... .. . . .. .I11-119
7 -18 SIDE SEWERS .. . . .... . .... . ..... .... . ....... .. . ............... .... .. .... .. .. .. . ....III-120
7-18.1 DESCRIPTION ............ .............. .......... . ... ................. .. ........ .... . ...III-120
7-18 2 MATERIALS . .. .... .. .. .. . ....... . .... ...... . . .. . . . .... ... . .. ......... . . III-121
7-18.3 CONSTRUCTION REQUIREMENTS . .. .. .. ......... .. .. .................... .....III-121
7-18 4 MEASUREMENT ........ ............. . . .... . ..... .......... .. .... ........... .... ....III-121
7 -18.5 PAYMENT ................ ........... ...... . .. ......... ......... ............... ... III-121
' 7-19 SEWER CLEANOUTS . ....... . .. .. . ... .. ..... .. .. ........... .. ................. ...... .. . III-122
... 122
7-19 2 MATERIALS ... . . ...... .. . . ........ .. ... . ..... ....... .. .......... ............ .
, 7-19.3 CONSTRUCTION REQUIREMENTS . ... . ............ .. .. . .......... .. ::::.:.::..111�122
7-19.4 MEASUREMENT .... . .. ..... . . .. .... .. . . . ......... ...... .. ....... III 123
7-19 5 PAYMENT ..... . ........ .. ............ ....... .. ... .......... .. . ..... .... . ....... . I11-123
'
'
'
�
'
7-22 GRINDER PUMP ASSEMBLIES (NEW SECTION) .. . ....... . ..... ......... .. .... . . .III-124
7-22 1 DESCRIPTION ......... . ... ... .. . ... .... .. ....................... . .. .... .. .. .....III-124
7-22 2 MATERIALS .. . ....... . ........... ...... .... ......... ....... ............ ........ ............ III-124
7-22 3 CONSTRUCTION REQUIREMENTS .... ...................... . ..... .... .......... .. .III-124
7-22.3(1) GENERAL . ... . . . . .... .. .... ... .... ... . .. ....... .. ...... .... . .. ....... .. .III-124
7-22.3(2) INSTALLATION STANDARDS ...... .... ... .. .. ... ......... ....... ....... . .. III-124
7-22 3(3) CALL FOR INSPECTION . ......... .... .... . .... .. ....... . ......... .. .. .. .. .... .III-126
7-22.3(4) TESTING OF FINAL INSTALLATION .. .. ... . ... .. ... .. ... ............ ... ....III-126
C�ty of Bremerton 236-1896-113 (01/04)
Wash�ngton Avenue Sewer Improvements �x November 2013
Contract Documents Table of Contents
�
�
7-22 3(5) RESIDENCE ELECTRICAL PANEL UPGRADE .... ...... .. ............... .... ...III-126
7-22.4 MEASUREMENT ...... ......... .. ...... .... ... ..... .... ....... .............. ......... ...III-127
7 -22.5 PAYMENT ............................ ........................................... ...........III-127
DIVISION 8 MISCELLANEOUS CONSTRUCTION ....... ... ...... .. .... .. .. . ..... ....... ....III-129
8-01 EROSION CONTROL AND WATER POLLUTION CONTROL ... ......... ......... .. ...III-129
8-01.3 CONSTRUCTION REQUIREMENTS ... ...... .. . ..... ........ .... .. ........... . .III-129
8-01.4 MEASUREMENT .. . ...... . ..... .... .... . . .. . ... . ..... . ....... . .... . ... ... ...III-129
8-015 PAYMENT ........................ .................................. .. ....................III-129
8-02 ROADSIDE RESTORATION .... ... ..... .... ... . . . .. . . . ..... .. ..... .. .... .. . ... ...... III-130
8-02.1 DESCRIPTION ...................... .. . ..... ........... .... ... ..... .... ..... .... ..........III-130
8-02.3 CONSTRUCTION REQUIREMENTS . ... ......... . . ... ........ ....... ....... . . ..III-131
8-02.4 MEASUREMENT ........ .. .... . . ... . . ...... ......... ... ..... ... ... .. ... ....... ..III-131
8-02.5 PAYMENT ........ ................ .......... ..........................................I11-131
8-04 CURB, GUTTERS, AND SPILLWAYS . ....... ........ ... ...... ....... .......... .......... ...III-132
8-04.3 CONSTRUCTION REQUIREMENTS .... .. ...... . ................... ... .... . ... .. III-132
8-04.3(1) CEMENT CONCRETE CURBS, GUTTERS, AND SPILLWAYS .. ...........III-132
8-04.5 PAYMENT ......... ........................ . .. . .... ............ . ... .. ... III-132
8-06 CEnAENT COfVCRETE DRIVEWAY ENTRAIVCES . . .. ... .. . ... ... . ..... .. ... . .. III-132
8-061 DESCRIPTION ....... ................. .... ....... .. ................................III-132
8-06.4 11AEASUREMENT ... . ...... ..... ... .. ........ .. .... ................ ... .............111-132
8-06 5 PAYMENT . .. .... ..... .... .. .... . . ......... ..... . .. ... ....... .... .. . ... . ..... III-132
8-13 MONUMENT CASES ....... .... ... . ........... ..... . ... ........ ........ ....... ... . .. .... .....III-133
8-13.1 DESCRIPTION .... ........... ......... .............. .............................III-133
8-13.2 MATERIALS .... . .... .... . ...... ............. .... ... ... .......... ........ .... ....... ... .III-133
8-13.3 CONSTRUCTION REQUIREMENTS ......... ....... .............. . ....... ........... .III-133
8-13.4 MEASUREMENT ........... .... ................................................. .. ........III-133
8-13.5 PAYMENT ..... ......... ............ . .... . ... .. ...... . ... ..... .. .......... .. ... . ..III-133
8-22 PAVEMENT MARKING ..... .... .. .. ..... . ... . . .... ... .... .. .. . ....... .. ... .... .........III-134
8-221 DESCRIPTION .................. ..........................................................III-134
8-22 4 MEASUREMENT . ....... . ..... ... ............ ... ...... .. .............. ... ... .... ...III-134
8-22.5 PAYMENT ......................... ... .......... ...... ............... .......... ...III-134
City of Bremerton 236-1896-113 (01/04)
Wash�ngton Avenue Sewer Improvements lll-x November 2013
Contract Documents Table of Contents
'
' DIVISION 9 MATERIALS... . .. . . .
. ............. .... .... . ...... ........ . .. ...... ...... . ... .... ...III-135
' 9-05 DRAINAGE STRUCTURES, CULVERTS, AND CONDUITS .. ... .. .. ... . . ... .. III-135
9-05.23 HIGH-DENSITY POLYETHYLENE (HDPE) PIPE . . .. .... . ............ ........III-135
� 9-30 WATER DISTRIBUTION MATERIALS .............. ..... ....... .. .. .. ..... .......... ........III-136
9-30.1 PIPE ....................... ....... ........................... .. .... ..................III-136
' 9-30.2 FITTINGS .... . ..... . . . .. ....... ................ . ...... ... .. .... ....... ... ...............III-137
. -1 7
9-30.2(6) RESTRAINED JOINTS ... . .. ........... .. . . . .... ... .
9-30.3 VALVES ... .......... .... ......... ............. .. ......... ..... ........ .............III-137
� 9-30.3(4) VALVE BOXES . .... . . ..... .. ............ .. ... ... ... ... . ..... . .. ....... .. ... . .III-137
9-30.3(5) VALVE MARKER POSTS ... ... ............... ..... .... ...... ... . . ... .... ... .. ... III-138
t 9-30.5 HYDRANTS . . ...... ....... ..... . . ....... .. . ...... .. .... ...... ... ......... .. .......III 138
........ . III 138
9-30.5(2) HYDRANT DIMENSIONS ......... .... .. ......... ... .......... .... ...... .. -
, 9-30.5(6) GUARD POSTS ....... . ........ ... ........... . ........ . . ....... .. .. ... .. III-138
9-30.6 WATER SERVICE CONNECTIONS (2 INCHES AND SMALLER) ........ III-138
9-30.6(1) SADDLES .......... . ................ ... .... .. .. . ...... .. ... .... ........ ..... ... ........III-139
' 9-30.6(2) CORPORATION STOPS ... ..... .. .. ...... ... ..... .. ... ..... ... .. ........ ...... III-139
9-30.6(3) SERVICE PIPES . .. . .......... .... ....... .. .. ... ... .. .. ............ ........ .....III-139
, 9-30.6(3)B POLYETHYLENE TUBING .. .... .... . . ..... .. ... ..... .. ......... ..... .. ......111-139
�
L�
�
'
�
LJ
'
STANDARDPLANS . . ..... ... .. ........ .............. .. . ... ........ ............ . . ............. .. ... ..III-141
1 C�ty of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer Improvements xi November 2013
Con[ract Documents Table of Contents
C '
'
'
�
'
'
,
,
,
1
,
'
,
'
'
�
'
'
SPECIAL PROVISIONS
INTRODUCTION TO THE SPECIAL PROVISIONS
��*.**.
The work on this pro�ect shall be accomplished in accordance with the Standard Specifications
for Road, Bridge and Municipal Construction, 2012 edition, as issued by the Washington State
Department of Transportation (WSDOT) and the American Public Works Association (APWA),
Washington State Chapter (hereafter "Standard Specifications") The Standard Specifications,
as modified or supplemented by the Amendments to the Standard Specifications and these
Special Provisions, all of which are made a part of the Contract Documents, shall govern all of
the Work
These Special Provisions are made up of both General Special Provisions (GSPs) from various
sources, which may have pro�ect-specific fill-ins, and pro�ect-specific Special Provisions Each
Provision either supplements, modifies, or replaces the comparable Standard Specification, or is
a new Provision The deletion, amendment, alteration, or addition to any subsection or portion of
the Standard Specifications is meant to pertain only to that particular port�on of the section, and
in no way should it be interpreted that the balance of the section does not apply
The proJect-specific Special Provisions are not labeled as such The GSPs are labeled under
the headers of each GSP, with the date of the GSP and its source, as follows
(May 18, 2007 APWA GSP)
(August 7, 2006 WSDOT GSP)
(April 7, 2007 City of Bremerton GSP)
- City of Bremerton GSPs are indicated by the characters (**"**`)
- City of Bremerton new sections are indicated by the text (NEW SECTION)
Also incorporated mto the Contract Documents by reference are the following documents The
Contractor shall obtain copies of these publications, at Contractor's own expense
Manual on Uniform Traffic Control Devices for Streets and Highways, currently adopted
edition, with Washmgton State modifications, if any
- Standard Plans for Road, Bridge and Murncipal Construction, WSDOT/APWA, current
edition
- City of Bremerton Standards for Work in the Right-of-Way (avadable at
http //www ci bremerton wa us/display php�id=424
' Ciry of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documents
lll-1
236-1896-113 (01/04)
November 2013
Speaal Prows�ons
'
[l
'
�
'
'
�
�
'
�
�
'
��
�
'
'
This Page intentionally Left Blank
1
'
C�ry of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
!ll-2
236-1896-113 (01/04) �
November 2013
Speaal Provis�ons
'
�
'
�
'
'
'
'
'
'
1-01
'
,
�
�
Il
DIVISION 1
DESCRIPTION OF WORK
GENERAL REQUIREMENTS
�#*#.*.�
This Contract prowdes for the completion of the Washington Avenue Sewer Improvements
Pro�ect, all in accordance with the attached Contract Plans, these Contract Provisions, and
the Standard Specifications
The improvements for which bids wdl be received are described as follows
The WORK to be completed under this Contract generally consists of replacing 800 feet
of sewer main with 10-inch-diameter HDPE and 500 feet of sewer main with 8-inch-
diameter PVC pipe, constructmg 800 feet of new 4-inch-diameter HDPE sewer pipe slip-
lined through an 8-inch-diameter ductile iron water main that will be abandoned as part
of this pro�ect, 2,500 feet of 8-inch-diameter ductde iron water main, 14 individual grinder
pump stations with 1,100 feet of 1-1/4-inch-diameter HDPE pressure sewer lateral pipe,
and the demolition of 1,000 feet of existmg concrete pavement roadway along Sheldon
Boulevard and reconstruction with an HMA pavement Pro�ect site is located within the
vicinity of Evergreen Park and the Manette Bridge
DEFINITIONS AND TERMS
Definitions
1-01.3
�******�
This Section is supplemented with the following
All references in the Standard Specifications to the terms "State", "Department of
Transportation", "Washington State Transportation Commission", "Commission",
"Secretary of Transportation", "Secretary", "Headquarters", and "State Treasurer" shall
be revised to read "Contractmg Agency"
All references to "State Materials Laboratory" shall be revised to read "Contracting
Agency designated location"
The venue of all causes of action arising from the advertisement, award, execution, and
performance of the contract shall be in the Supenor Court of the County where the
Contracting Agency's headquarters are located
' Additive
A supplemental unit of work or group of bid items, identified separately in the Bid
Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition
to the base bid
'
�J
J
Alternate
One of finro or more units of work or groups of bid items, identified separately in the
proposal, from which the Contracting Agency may make a choice between different
methods or material of construction for performing the same work
City of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements 111-3 November 2013
Contract Documents Div�s�on 1
I I
Business Day -
A business day is any day from Monday through Friday except holidays as listed in
Section 1-08 5
City
The word "City" shall mean the City of Bremerton, Department of Public Works and
Utdities, 3027 Olympus Drive, Bremerton, Washington, 98310
Comm�ssion, Washington State Transportation Commission
Substitute the following
The words "Commission" or "Washington State Transportation Commission" shall
refer to the City of Bremerton City Councd
Contract Bond
The definition in the Standard Specifications for "Contract Bond" applies to whatever
bond form(s) are required by the Contract Documents, which may be a combination of a
Payment Bond and a Performance Bond
Contract Documents
See definition for "ContracY'
Contract T�me
The period of time established by the terms and conditions of the Contract within which
the Work must be substantially complete The Contract Time is in calendar days
Contracteng Agency
The City of Bremerton, Department of Public Works and Utdities, 3027 Olympus Drive,
Bremerton, Washington, 98310 acting through its legally constituted officials, agents,
officers, or employees, is responsible for the execution and administration of the
Contract
Dates
Bid Opening Date
The date on which the Contracting Agency publicly opens and reads the Bids
Award Date
The date of the formal decision of the Contracting Agency to accept the lowest
responsible and responsive Bidder for the work
Contract Execution Date
The date the Contracting Agency offic�ally binds the Agency to the Contract
Notice to Proceed Date
The date stated in the Notice to Proceed on which the Contract time begms
Ciry of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
lll-4
236-1896-113 (Ol/04) '
November 2013
D�vis�on 1
�
�
�
1
'
Substantial Completion Date
The day the Engmeer determines the Contracting Agency has full and unrestricted
use and benefit of the facilities, both from the operational and safety standpoint, any
remairnng tra�c disruptions wdl be rare and brief, and only minor incidental work,
replacement of temporary substitute facdities, plant establishment periods, or
correction or repair remams for the Physical Completion of the total Contract
Physical Completion Date
, The day all of the Work is physically completed on the pro�ect All documentation
required by the Contract and required by law does not necessarily need to be
furnished by the Contractor by this date
'
L__J
�J
�
Completion Date
The day all the Work specified in the Contract is completed and all the obligations of
the Contractor under the Contract are fulfilled by the Contractor All documentation
required by the Contract and required by law must be furnished by the Contractor
before establishment of this date
Final Acceptance Date
The date on which the Contractmg Agency accepts the Work as complete
Department, Department of Transportation
Substitute the following
The words "Department" or "Department of Transportation" shall mean the City of
1 Bremerton, Department of Public Works and Utdities, 3027 Olympus Drive,
Bremerton, Washington, 98310
�
�
Engineer
Substitute the following
The word "Engineer" shall mean the City of Bremerton City Engineer and his/her
authorized representatives
Force Account Work
' Additional Work that may be required because of City-directed changes in the work,
differing site conditions, emergencies or other reasons that the Engmeer determines is
not included in the Contract urnt prices, and for which payment is to be determined as
' required by Sections 1-04 and 1-09 of this Contract Force Account Work shall be
authorized only by written Work Change Directive issued by the Engineer
�
'
,
Imported Material
Materials obtamed from sources outside the pro�ect site that are not furnished by the
City Materials excavated from anywhere on the pro�ect or from designated borrow
areas, or that are furrnshed by the City, shall not be considered imported material
' City of Bremerton
Washington Avenue Sewer Improvements
Contract Documen[s
lll-5
236-1896-113 (Ol/04)
November 2013
D�v�s�on 1
u
Laboratory
Delete this definition and substitute the followmg
The word "Laboratory" shall mean the official laboratories of the City of Bremerton, or
other laboratories the City of Bremerton authorizes to test work, sods, and materials
Notice of Award
The written notice from the Contracting Agency to the successful bidder signifying the
Contracting Agency's acceptance of the Bid
Notice to Proceed
The written notice from the Contractmg Agency or Engineer to the Contractor authorizing
and directing the Contractor to proceed with the Work and establishing the date on
which the Contract time begins
Owner
The City of Bremerton, Department of Public Works and Utilities, 3027'Olympus Dnve,
Bremerton, Washington, 98310 acting through its legally constituted officials, agents,
officers, or employees, is responsible for the execution and admmistration of the
Contract
Plans
Add the following
Plans consist of City of Bremerton Standard Detads mcluded m Appendix B
Provide
The word "provide" shall be understood to mean "furnish and install, complete in place "
Secretary, Secretary of Transportation
Substitute the followmg
All reference to the words "Secretary" or "Secretary of Transportation" shall mean the
City of Bremerton City Council, Mayor or their authorized representatives
State '
Substitute the following
The word "State" shall mean the City of Bremerton Department of Publ�c Works and
Utdities, 3027 Olympus Drive, Bremerton, Washmgton, 98310 When in reference to a
State law or code, "State" shall remain in effect _
Traffic
Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs,
and equestrian traffic
Work Change Directive
A written order issued by the Engineer directing a change in the design, specifications,
quantities, materials or methods of the work A Work Change Directive may, or may not,
alter the Contract Price or Contract Time
C�ry of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements 111-6 November 2013
Con[ract Documents D�v�s�on 1
'
,
1-02
' 1-02 1
�
'
'
�
�
�
�
'
,
�
,
�
�
�
BID PROCEDURES AND CONDITIONS
Prequalification of Bidders
(January 24, 2011 APWA GSP)
Delete this Section and replace it with the following
Before award of a public works contract, a bidder must meet at least the minimum
qualifications of RCW 39 04 350(1) to be considered a responsible bidder and qualified to
be awarded a public works pro�ect
1-02 2 Plans and Specificat�ons
�.:#.**�
Delete this section and replace it with the following
Information as to where Bid Documents can be obtained or reviewed can be found in the
Noticing Invitmg Bids
After award of the contract, plans and specifications wdl be issued to the Contractor at no
cost as detaded below
To Prime Contractor
Reduced plans (11" x 17")
Contract Provisions
Large plans (e g, 22" x 34")
No of Sets
5
� r
Basis of Distribution
Furnished automatically upon award
Furnished automatically upon award
Furnished only upon request
Additional plans and Contract Provisions may be obtained by the Contractor from the source
stated in the Notice Invitmg Bids
1-02.3 Estimated Quantities
�:****�
Delete this section and replace with the following
The est�mated quantities shown in the bid forms are estimates only, bemg given only as the
basis for the comparison of bids, and the City does not warrant, expressly or by impl�cation,
that the actual amount of work wdl correspond therewith The right to increase or decrease
the amount of any class or portion of the work or to make changes in the work required as
may be deemed necessary is reserved by the City as provided elsewhere in these
specifications The basis of payment will be the actual unit bid items of work performed and
measured in accordance with the contract All prospective bidders should note that certam
bid items might be included in the Bid Form to establish a unit price should the use of those
items become necessary durmg construction Allowance will not be made for loss of
anticipated profits or additional compensation should the use of these items be deemed
unnecessary
' C�ry of Bremerton
Wash►ngton Avenue Sewer lmpravements
Contract Documents
lll-7
236-1896-113 (O7/04)
November 2013
Drv�sion 1
'
1-02.4
1-02 4(1)
Examination of Plans, Specifications, and Site of Work
General
�*.***.�
Section 1-02 4(1) is supplemented with the fol{owmg
No mterpretation of the meaning of the Plans, Specifications, or other Prebid Documents wdl
be made to any bidder orally Every request for such mterpretation shall be submitted in
writing, addressed to the City, and to be given consideration, shall be received at least
10 days prior to date fixed for bid opening Any and all such interpretations and any
supplemental instructions will be in the form of wntten Addenda to the Specifications that, if
issued, wdl be mailed or otherwise delivered to each prospective bidder Failure of any
bidder to receive any such Addendum sha11 not relieve such bidder from any obligation
under his bid as submitted All Addenda so issued shall become a part of the Contract
Documents
1-02.4(2j Subsurface Information
�.:****�
Replace Section 1-02 4(2) with the following
A geotechrncal evaluation of Sheldon Boulevard was performed by Shannon & Wilson A
copy of the geotechrncal report is mcluded in Appendix E
No other subsoil investigations were conducted at the site of the work
The Contractor is responsible for knowing and understanding subsurface conditions The
City assumes no responsibdity for soil conditions or groundwater level The Contractor shall
include provisions in the bid to properly handle subsurface conditions
1-02.5 Proposal Forms
(June 27, 2011 APWA GSP)
Delete this section and replace it with the following
The Proposal Form wdl identify the pro�ect and its location and describe the work It wdl also
list estimated quantit�es, urnts of ineasurement, the items of work, and the matenals to be
furnished at the unit bid prices The bidder shall complete spaces on the proposal form that
call for, but are not limited to, unit prices, extensions, summations, the total bid amount,
signatures, date, and, where applicable, retail sales taxes and acknowledgment of addenda,
the bidder's name, address, telephone number, and signature, the bidder's D/M/WBE
commitment, if applicable, a State of Washington Contractor's Registration Number, and a
Business License Number, if applicable Bids shall be completed by typing or shall be
printed in ink by hand, preferably in black mk The required certifications are mcluded as part
of the Proposal Form
The Contracting Agency reserves the nght to arrange the proposal forms with alternates and
additives, if such be to the advantage of the Contracting Agency The bidder shall bid on all
alternates and additives set forth m the Proposal Form unless otherwise specified
Ci[y of Bremerton 236-1896-113 (01/04)
Wash�ngton Avenue Sewer Improvements lll-8 November 2013
Contrac[ Documents Div�s�on 1
�
'
1-02.6 Preparation of Proposal
�
'
'
'
'
(June 27, 2011 APWA GSP)
Supplement the second paragraph with the following
4 If a mmimum bid amount has been established for any item, the urnt or lump sum price
must equal or exceed the minimum amount stated
5 Any correction to a bid made by interlineation, alteration, or erasure, shall be initialed by
the signer of the bid
Delete the last paragraph, and replace it with the following
The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in any manner
A bid by a corporation shall be executed in the corporate name, by the president or a vice
president (or other corporate officer accompanied by evidence of authority to sign)
A bid by a partnership shall be executed in the partnership name, and signed by a partner A
, copy of the partnership agreement shall be submitted with the Bid Form if any D/M/WBE
requirements are to be satisfied through such an agreement
' A bid by a �oint venture shall be executed in the �oint venture name and be signed by a
member of the �oint venture A copy of the �oint venture agreement shall be submitted with
the Bid Form if any D/W/MBE requirements are to be satisfied through such an agreement
�
L��
,
'
�
'
'
,
LJ
A bid by a limited liability company shall be executed in the limited liability company name
and be signed by a member, accompanied by the enclosed Certificate of Authority to sign,
and his/her title must appear under the signature and the official address of the �oint venture
must appear below the signature
1-02 7 Bid Deposit
(March 8, 2013 APWA GSP)
Supplement this section with the following
Bid bonds shall contain the followmg
��
3
1 Contracting Agency-assigned number for the pro�ect,
Name of the pro�ect,
The Contracting Agency named as obiigee,
4 The amount of the bid bond stated either as a dollar figure or as a percentage which
represents five percent of the maximum bid amount that could be awarded,
5 Signature of the bidder's officer empowered to sign official statements The signature
of the person authorized to submit the bid should agree with the signature on the
bond, and the title of the person must accompany the said signature,
6 The signature of the surety's officer empowered to sign the bond and the power of
attorney
City of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements !ll-9 November 2013
Contract Documents Divis�on 1
'
if so stated in the Contract Provisions, bidder must use the bond form included in the
Contract Provis�ons
If so stated in the Contract Provisions, cash will not be accepted for a bid deposit
1-02.8
1-02 8(1)
Non-Collus�on Declaration and Lobbying Certification
Non-Collusion Declarat�on
�:.:*.:�*�
Section 1-02 8(1) is supplemented with the following
As a condition precedent to award of the Contract for this work, the successful bidder shall
file a sworn statement executed by, or on behalf of, the person, association, or corporation
that he (they) has (have) not either directly or mdirectly, entered mto any agreement,
participated in any collusion, or otherwise taken any action m restraint of free competitive
biddmg in connection with such Contract
This sworn statement shall be m the form of an affidavit executed and sworn to be the
successful bidder before a person who is authorized by the Laws of this State to administer
oaths The orig�nal of such sworn statement shall be fded with the City Cferk, City of
Bremerton, prior to the award of the contract
The Non-Collusion Affidavit will be a part of the Bid Proposal By signing this proposal, the
bidder wdl be deemed to have signed and agreed to the provisions of the Non-Collusion
Affidavit
1-02.9 Delivery of Proposal
�:#:#:.�
Replace Section 1-02 9 with the following
Each proposal shall be submitted only on the blank forms bound in this document, and
submitted in a sealed envelope marked clearly with the pro�ect name Bid packet submitted
shall include all bid forms listed �n the B�dder Checklist m Part I
1-02.13 Irregular Proposals
(March 13, 2012 APWA GSP)
Revise item 1 to read
1 A proposal will be considered irregular and wdl be re�ected if
a The Bidder is not prequalified when so required,
b The authorized proposal form furnished by the Contracting Agency is not used or
is altered,
c The completed proposaf form contains any unauthorized additions, deletions,
alternate Bids, or conditions,
C�ty of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer Improvements 111-10 November 2013
Contract Documents D�vis�on 1
,
�
�
'
'
�
�
,
1
�l
'
LJ
�
��
,
�
�
�
d The Bidder adds provisions reserving the right to re�ect or accept the award, or
enter into the Contract,
e A price per unit cannot be determined from the Bid Proposal,
f The Proposal form is not properly executed,
g The Bidder fads to submit or properly complete a Subcontractor list, if applicable,
as required in Section 1-02 6,
h The Bidder fails to submit or properly complete a Disadvantaged, Minority or
Women's Business Enterprise Certification, if applicable, as reqwred in Section
1-02 6,
i The Bidder fads to submit written confirmation from each DBE firm listed on the
Bidder's completed DBE Utdization Certification that they are in agreement with the
bidders DBE participation commitment, if applicable, as required in Section 1-02 6,
or if the written confirmation that is submitted fails to meet the requirements of
the Special Provisions,
J The Bidder fads to submit DBE Good Faith Effort documentation, if applicable, as
required in Section 1-02 6, or if the documentation that is submitted fa�ls to
demonstrate that a Good Faith Effort to meet the Condition of Award was made,
k The Bid Proposal does not constitute a definite and unqualified offer to meet the
material terms of the Bid invitation, or
I More than one proposal is submitted for the same pro�ect from a Bidder under
the same or different names
1-02 14 Disqualification of Bidders
�..:�**�
Delete this Section and replace it with the following
A Bidder will be deemed not responsible if
1 The Bidder does not meet the mandatory bidder responsibility critena m
RCW 39 04 350(1), as amended, or
2 evidence of collusion exists with any other Bidder or potential Bidder Participants in
collusion wdl be restricted from submitting further bids, or
3 the Bidder, in the opirnon of the Contracting Agency, is not qualified for the work or to
the full extent of the bid, or to the extent that the bid exceeds the authorized
prequalification amount as may have been determined by a prequalification of the
Bidder, or
City of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements 1!1-17 November 2013
Contract Documents Divis�on 1
1
4 an unsatisfactory performance record exists based on past or current Contracting
Agency work or for work done for others, as �udged from the standpoint of conduct of
the work, workmanship, or progress, affirmative action, equal employment
opporturnty practices, termination for cause, or Disadvantaged Business Enterprise,
Minority Busmess Enterprise, or Women's Business Enterprise utdization, or
5 there is uncompleted work (Contracting Agency or otherwise), which in the opmion of
the Contracting Agency might hinder or prevent the prompt completion of the work
bid upon, or
6 the Bidder faded to settle bdls for labor or materials on past or current contracts,
unless there are extenuating circumstances acceptable to the Contracting Agency, or
7 the Bidder has faded to complete a written public contract or has been convicted of a
crime arising from a previous public contract, unless there are extenuating
circumstances acceptable to the Contracting Agency, or
8 the Bidder is unable, financially or otherwise, to perform the work, in the opinion of
the Contracting Agency, or
9 there are any other reasons deemed proper by the Contracting Agency
As evidence that the Bidder meets the bidder responsibility criteria above, the apparent finro
lowest Bidders may be required to submit to the Contracting Agency within 24 hours of the
bid submittal deadlme, documentation (sufficient in the sole �udgment of the Contracting
Agency) demonstrating compliance with all applicable responsibility criteria, including all
documentation specifically listed in the supplemental criteria The Contracting Agency
reserves the right to request such documentation from other Bidders as well, and to request
further documentation as needed to assess bidder responsibdity
The basis for evaluation of Bidder compliance with these supplemental criteria shall be any
documents or facts obtained by Contracting Agency (whether from the Bidder or third
parties) which any reasonable owner would rely on for determining such compliance,
mcluding but not limited to (i) financial, historical, or operational data from the Bidder,
(u) information obtained directly by the Contractmg Agency from owners for whom the Bidder
has worked, or other public agencies or private enterprises, and (ui) any additional
information obtained by the Contractmg Agency which is believed to be relevant to the
matter
If the Contracting Agency determines the Bidder does not meet the bidder responsibility
criteria above and is therefore not a responsible Bidder, the Contracting Agency shall notify
the Bidder m writing, with the reasons for its determination If the Bidder disagrees with this
determination, it may appeal the determmation withm 24 hours of receipt of the Contracting
Agency's determination by presenting its appeal to the Contracting Agency The Contracting
Agency wdl consider the appeal before issuing its final determination If the final
determination affirms that the Bidder is not responsible, the Contracting Agency wdl not
execute a contract w�th any other Bidder untd at least finro business days after the Bidder
determmed to be not responsible has received the final determmation
C�ty of Bremerton
Wash�ngton Avenue Sewer lmprovements
Contract Documents
lll-12
236-1896-113 (Ol/04) �
November 2013
D�v�s►on 1
'
'
,
'
�
�
�
'
�
�
�
'
'
'
u
'
�
�
'
1-02 15 Pre Award Information
(August 14, 2013 APWA GSP)
Revise this section to read
Before awarding any contract, the Contracting Agency may require one or more of these
items or actions of the apparent lowest responsible bidder
A complete statement of the origm, composition, and manufacture of any or all
materrals to be used,
2 Samples of these materials for quality and fitness tests,
3 A progress schedule (in a form the Contracting Agency requires) showmg the order
of and time required for the various phases of the work,
4 A breakdown of costs assigned to any bid item,
5 Attendance at a conference with the Engineer or representatives of the Engineer,
6 Obtain. and furnish a coqy of, a business license to do business in the citv or countv
where the work is located
7 Any other information or action taken that is deemed necessary to ensure that the
bidder is the lowest responsible bidder y
�.**.*.�
Add the following new section
1-02.16 Addenda and Interpretations of Documents (NEW SECTION)
No oral mterpretation of the mearnng of the plans, specifications, or other pre bid documents
will be made to any bidder Every request for such interpretation shall be submitted in
writing, addressed to the City's contact person (listed on the cover page of these contract
documents), and to be given consideration, shall be received at least three (3) workmg days
prior to date f�xed for B�d Opernng Any and all such interpretations and supplemental
mstructions will be in the form of wntten addenda to the Specifications which, if issued, wdl
be maded or otherwise delivered to each prospective bidder Failure of any bidder to receive
any such addendum shall not relieve such bidder from any obligation under his bid as
submitted All addenda so issued shall become a part of the Contract documents
1-03
1-03.1
AWARD AND EXECUTION OF CONTRACT
Consideration of Bids
(January 23, 2006 APWA GSP)
Revise the first paragraph to read
After opening and reading proposals, the Contracting Agency wdl check them for
correctness of extensions of the prices per unit and the total price If a discrepancy exists
between the price per unit and the extended amount of any bid item, the price per unit wdl
control If a minimum bid amount has been established for any item and the bidder's unit or
lump sum price is less than the minimum specified amount, the Contracting Agency wdl
Gtyof Bremerton 236-1896-113 (Ol/04)
Wash►ngton Avenue Sewer Improvements lll-13 November 2013
Contract Documents D�wsion 1
'
undaterally revise the unit or lump sum price, to the minimum speci�ed amount and
recalculate the extension The total of extensions, corrected where necessary, including
sales taxes where applicable and such additives and/or alternates as selected by the
Contracting Agency, wdl be used by the Contract�ng Agency for award purposes and to fix
the Awarded Contract Pnce amount and the amount of the contract bond
1-03.3 Execution of Contract
�*#�##*�
Replace Section 1-03 3 with the following
The City will mad three copies of the contract to the successful Bidder immediately after
award Withm 10 calendar days from receipt of the contracts, the successful bidder shall
return 3 signed origmal contracts, msurance certificates as reqwred by Section 1-03 8, and a
satisfactory bond as required by law and Section 1-03 4 of these Contract Documents
Before execution of the contract by the City, the successful bidder shall provide any
pre-award information the City may require under Section 1-02 15
Until the City executes a contract, no proposal shall bind the City nor shall any work begin
within the pro�ect limits or within City-furrnshed sites The Contractor shall bear all risks for
any work begun outside such areas and for any materials ordered before the contract is
executed by the City
If the bidder's performance of the requirements of this Section is delayed by circumstances
beyond the bidder's control, the City may grant up to 20 calendar days of additional time,
provided that the City agrees that circumstances warrant an extension
1-03.4 Contract Bond
�****..�
Replace Section 1-03 4 with the following
The successful bidder shail provide executed contract bonds in the form of a Performance
Bond and a separate Payment Bond, each for the full contract amount
The Pe�formance Bond shall
1 Be on a Contracting Agency-furnished form,
2 Be signed by an approved surety (or sureties) that
a Is registered with the Washington State Insurance Commissioner, and
b Appears on the current Authorized Insurance List in the State of Washmgton
published by the Office of the Insurance Commissioner,
3 Be conditioned upon the faithful performance of the contract by the Contractor within
the prescribed time,
4 Guarantee that the surety shall indemnify, defend, and protect the Contractmg
Agency against any claim of direct or indirect loss resulting from the failure of the
C►ty of Bremerton 236-1896-113 (O]/04)
Wash�ngton Avenue Sewer Improvements iii-14 November 2013
Contract Documents D�vis►on 1
'
'
'
,
�
�
C�
Contractor (or any of the employees, subcontractors, or lower tier subcontractors of
the Contractor) to faithfully perform the contract
5 Be accompanied by a power of attorney for the Surety's officer empowered to sign
the bond, and be signed by an officer of the Contractor empowered to sign official
statements (sole proprietor or partner) If the Contractor is a corporation, the bond
must be signed by the president or vice-president, unless accompanied by written
proof of the authority of the individual sigrnng the bond to bind the corporation
(i e, corporate resolution, power of attorney or a letter to such effect by the president
or vice-president)
The Payment Bond shall
1 Be on a Contractmg Agency-furnished form,
2 Be signed by an approved surety (or sureties) that
a Is registered with the Washington State Insurance Commissioner, and
'
�
�
'
b Appears on the current Authorized Insurance List in the State of Washmgton
published by the Office of the Insurance Commissioner,
c Guarantee that the surety shall indemnify, defend, and protect the Contracting
Agency against any claim of direct or indirect loss resultmg from the fadure of the
Contractor (or the subcontractors or lower tier subcontractors of the Contractor)
to pay all laborers, mechanics, subcontractors, lower tier subcontractors, material
person, or any other person who provides supplies or provisions for carrying out
the work,
3 Be accompanied by a power of attorney for the Surety's officer empowered to sign
the bond, and
, 4 Be signed by an officer of the Contractor empowered to sign official statements (sole
proprietor or partner) If the Contractor is a corporation, the bond must be signed by
the president or vice-president, unless accompanied by wntten proof of the authonty
' of the individual signing the bond to bind the corporation (i e, corporate resolution,
power of attorney or a letter to such effect by the president or vice-president)
,
�
The Performance Bond for this pro�ect shall remain in full force and effect for a period of
one (1) year following acceptance by the City The bond shall be executed by a surety
company authorized to do business withm the State of Washington and shall be sub�ect to
the approval of the City
1-03.7 Judicial Review
, ��***.��
Delete all occurrences of "Thurston County" in this section and replace with "Kitsap County"
'
' City of Bremenon
Wash►ngton Avenue Sewer Improvements
Contract Documents
lll-15
236-1896-113 (01/04)
November 2013
Div�s�on 1
,
1-04
1-04.2
SCOPE OF WORK
Coordination of Contract Documents, Plans, Special Provisions,
Specifications, and Addenda
(March 13, 2012 APWA GSP)
Revise the second paragraph to read
Any inconsistency m the parts of the contract shall be resolved by following this order of
precedence (e g, 1 presiding over 2, 2 over 3, 3 over 4, and so forth)
1 Addenda,
2 Proposal Form,
3 Special Provisions,
4 Contract Plans,
5 Amendments to the Standard Specifications,
6 Standard Specifications,
7 Contracting Agency's Standard Plans or Detads (if any), and
8 WSDOT Standard Plans for Road, Bndge, and Municipal Construction
1-04 4 Changes
1-04.4(1) Minor Changes
�..**.*�
Section 1-04 4(1) is supplemented with the following
Payments or credits for changes amountmg to $10,000 or less, excludmg increased or
decreased quantities, may be made under the bid item "IVlmor Changes and Force Account"
At the discretion of the Contractmg Agency, this procedure for Minor Changes may be used
m lieu of the more formal procedure as outlined in Section 1-04 4, "Changes "
The Contractor wdl be provided a copy of the completed order for Minor Change The
agreement for the Minor Change will be documented by signature of the Contractor, or
notation of verbal agreement by the Engineer If the Contractor is in disagreement with
anythmg required by the order for Mmor Change, the Contractor may protest the order as
provided in the Standard Specifications, Section 1 04 5
Payments or credits will be determined m accordance with the Standard Specifications,
Section 1 09 4 For the purpose of providing a common proposal for all bidders, the
Contracting Agency has entered an amount for "Minor Changes and Force Account" m the
Proposal to become a part of the total bid by the Contractor
C�ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements lll-16 November 2013
Conuact Documents Diws�on 1
'
' 1-04 6 Variation in Estimated Quantities
'
,
,
Section 1-04 6 is deleted in its entirety
�******�
Add the following new section
1-04.12 Phased Substantial Completion (NEW SECTION)
The WORK will be accomplished in two phases which are described as follows
'
,
'
'
,
�
�
'
, 1-05
1-05 3
,
'
�
�
Phase 1 consists of material procurement (upon submittal approval), mobilization,
construction of all utdity and roadway improvements within the public rights-of-ways of
Sheldon Boulevard, 14th Street, 13th Street, McKenzie Avenue, Cogean Avenue, Pacific
Avenue, Pleasant Avenue, and lower Highland Avenue as shown in the areas on Sheets
C1 1, C1 2, C1 3, C1 4 C1 5, C1 9, C1 10, and C1 11 (reference Sheet Key Map on
Sheet G1 4)
In order to accommodate seasonal events at Evergreen Park, Phase 1 work shall obtain
Substantial Completion by May 1, 2014 Substantial completion for Phase 1 shall include
final pavmg, demobdization, and reopenmg to traffic of Sheldon Boulevard, 14th Street,
McKenzie Avenue, Cogean Avenue, Pleasant Avenue, lower Highland Avenue, Pacific
Avenue, and 13th Street The Contractor must vacate the stagmg area at 13th and
Cogean prior to final paving but may retain the staging area ad�acent to the
9-11 Memorial Site on Highland Avenue for the remainder of the work
Phase 2 consists of the construction of utdity and roadway improvements along Highland
Avenue, (south of 13th Street), 11th Place, and Washington Avenue as shown in the
areas on Sheets C1 5, C1 6, C1 7, and C1 8, as well as installation of all individual
grinder pump stations on Washington Avenue
Phase 2 Substantial Completion is 210 calendar days from the Notice to Proceed for this
phase and constitutes completion of the remainder of the work
Notice to Proceed for both Phase 1 and Phase 2 wdl be issued concurrently immediately
after execution of the contract by both parties
CONTROL OF WORK
Plans and Working Drawings
�*:*�**�
Supplement this section with the following
Record Drawings
Prior to acceptance of the completed pro�ect, the Contractor shall furrnsh the Engineer one
legible and neatly marked set of full-sized Plans showing any changes in location, elevation,
or configuration of the pipelines and appurtenant valves and fittmgs, manholes, catch
basins, site work, and other pertinent items These Plans shall be kept current during the
course of construction, kept on site at the Contractor's site office, and be available for review
C�ty of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer Improvements lll-17 November 2013
Contract Documents D�ws�on 1
'
by the Engineer at all times The Contractor is not responsible to complete record drawings
in electronic format (e g, AutoCAD) Record drawings shall be updated dady and changes
occurring on any day shall be entered on the record drawings by noon on the next workmg
day The Contractor and the Engineer shall review the record drawings weekly A pay
submittal shall not be considered complete or payable if the record drawings are not current
as required by this session
No measurement or payment wdl be made to complete record drawings Record drawings
shall be considered incidental to other bid items
1-05.4 Conformity with and Deviat�ons from Plans and Stakes
Section 1-05 4 is supplemented with the following
Owner-Provided Surveying
Staking for the installation of utilities and for the construction of the roadway and other
facdities wdl be provided by the Owner as follows
Sewer One (1) offset stake and hub wdl be provided at approximately 50-foot intervals
along the proposed sewer main Imes, with cut/fill identified to pipe invert Two (2) offset
stakes and hubs wdl also be provided for manholes along the sewer main lines, with
cut/fdl identified to invert and rim Cut sheets showmg results of the sewer staking wdl be
provided to the Contractor
Water One (1) offset stake and hub wdl be prowded at +/-50-foot intervals and/or
appropriate tee/bend locations along the new water lines, along w�th water appurtenances
such as water meters, hydrants, and valves
Storm Sewer One (1) offset stake and hub wdl be provided at approximately 50-foot
intervals along the proposed storm Imes with cu�ll identified to pipe mvert Two
(2) offset stakes and hubs wdl also be provided for Manholes or Catch Basins along the
storm lines, with cu�ll identified to invert and rim Cut sheets showing results of the
storm staking will be provided to the Contractor
Roadway
Rough Grading One (1) offset stake and hub
50-foot intervals along the proposed constructio
given to firnsh grade for rough grading purposes
wdl be rovided at a roximatel '
P pP Y
n centerline Cuts and fills will be
Curbs and Asphalt Edges One (1) offset stake and hub wdl be provided at
approximately 25-foot intervals along the proposed curbs and asphalt edges,
including PCs/PTs of curves, angle points, and radius points where applicable Cuts
and fdls wdl be given to the top back of curb
All other required staking shall be provided by the Contractor as Pro�ect Surveying
In addition to the requirements of Section 1-05 of the Standard Specifications, the following
shall apply
• A minimum notice of 3 working days shall be required for staking requests Staking
increments shall be for a minimum of one full day
• All stakmg requests shall be in wnting on a form provided by the Owner (see
Appendix D)
City of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer Improvements 111-18 November 2013
Contract Documents Diwsion 1
8
�
'
'
�
�
,
'
'
1
�
'
�
'
'
�
• Staking shall be consistent with acceptable practices
• All stakes shall be set one time only Replacement stakes, if needed, shall be paid
for by the Contractor
Monuments and Property Corners
It is the Contractor's responsibdity to notify the Engineer if a monument or property
corner will be damaged or lost due to construction activities in accordance with
Washington State Law, the monument or property corner must be perpetuated and
replaced upon completion of the pro�ect
Monument Positions
Monuments shall be referenced and an application for permit to remove or destroy a
survey monument wdl be fdled out by the City and will be submitted to the Department of
Natural Resources (DNR) Upon completion of the road surface, the destroyed
monument position wdl be reset and referenced by four 2-foot straddle positions set by
the City The Contractor wdl then drdl and core out the monument position and place a
blank surface brass monument cemented in the cored position, after which the City wdl
mark the referenced position and file a completion report for Monument Removal or
Destruction with the DNR
�.«*.**�
1-05.5 Submittals (NEW SECTION)
1-05.5(1) General
' Submittals covered by these requirements include manufacturers' information, Shop
Drawings, test procedures, test results, samples, requests for substitutions, and
miscellaneous work-related submittals Submittals shall also mclude, but not be limited to, all
' materials, fabricated items, schedules, plans, and all other submittals specifically listed
elsewhere in the Contract Documents The Contractor shall furnish all drawings,
specifications, descriptive data, certificates, samples, tests, methods, schedules, and
' manufacturer's installation and other instructions as specifically required in the Contract
Documents to demonstrate fully that the materials and equipment to be furnished and the
methods of work comply with the provisions and intent of the Contract Documents
�
1-05.5(2) Contractor's Responsibilities
The Contractor shall be responsible for the accuracy and completeness of the information
' contained in each submittal and shall assure that the material, equipment, or method of
work shall be as descnbed in the submittal The Contractor shall verify that all features of all
products conform to the specified requirements Submittal documents shall be clearly edited
to indicate only those items, models, or series of equipment, which are being submitted for
1 review All extraneous materials shall be crossed out or otherwise obliterated The
Contra�tor shall ensure that there is no conflict with other submittals and notify the City in
each case where his submittal may affect the work of another contractor or the City The
' Contractor shall completely coordinate submittals among his subcontractors and suppliers
including those submittals complying with applicable technical sections
�
,
The Contractor shall coordinate submittals with the work so that work wdl not be delayed
The Contractor shall coordinate and schedule different categories of submittals, so that one
will not be delayed for lack of coordmation with another No extension of time wdl be allowed
C�ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements Ill-19 November 2013
ConVact Documents D�vis�on 1
,
because of fadure to properly coordinate, schedule or provide complete subm�ttals, or not
allowing for sufficient review and processing time by the City
The Contractor shall not proceed with any portion of work related to a submittal untd
1 The submittal process is complete,
2 Contractor has obtained from the City a submittal marked "No Exceptions Taken",
"Make Corrections Noted" or "Product Data/Not Reviewed" �
The Contractor shall certify on each submittal document that he has reviewed the submittal,
verified field conditions, and complied with the Contract Documents by signing and dating
the submittal transmittal form
The Contractor may authorize in writing a material or equipment supplier to deal directly with
the City with regard to a submittal These dealings shall be limited to contract interpretations
to clarify and expedite the work In such cases, the Contractor is not absolved from his
responsibihties defined herein ;
1-05.5(3) Request for Substitution or Deviation
Whenever materials or equipment are indicated in the Contract Documents by using the
name of a proprietary item or the name of a particular Supplier, the naming of the item or
supplier is intended to establish the type, function, and quality required Unless expressly
stated otherwise, materials or equipment of other suppliers may be accepted if sufficient
information is submitted by the CONTRACTOR to allow the ENGIiVEER to determme that
the material or equipment proposed is equivalent or equal to that named
The Contractor shall bear all actual costs incurred by the City associated with review of a
proposed substitution or deviation regardless of whether the substitution or deviation is
ultimately approved by the City
Requests for substitution or deviation for other equipment or mater�al shall be m writing and
shall be accompanied with sufficient mformation to permit the City to identify the nature and
scope of the request Information to be provided along with the request shall include
1 All submittal mformation required for the specified equipment, includmg all deviations
from the spec�fied requirements necessitated by the proposed substitution
2 Materials of construction, including material specifications and references
3 PerFormance data, including perFormance curves and guaranteed power
consumption, over the range of specified operating conditions
4 Dimensional drawmgs, showing required access and clearances, including any
changes to the work required to accommodate the proposed substitution or
deviation
5 Where controls are a part of the proposed substitution or dewation, piping, process
and instrumentation drawings (PIDs), produced in the pro�ect format and with pro�ect-
specific symbols, along with control descriptions
C�ty of Bremerton 236-1896-113 (01/04)
Wash�ngton Avenue Sewer Improvements 111-20 November 2013
Contract Documents D�ws�on 1
'
�'
'
,
6 Where controls specified in the pro�ect manual require modification to accommodate
the proposed substitution or deviation, piping, process and instrumentation drawings
(PIDs), produced in pro�ect format and with pro�ect-specific symbols, with all required
modifications cleariy highlighted
7 Information and perFormance characteristics for all system components and ancillary
devices to be furrnshed as a part of the proposed substitution or deviation
' 8 Reproducible contract drawings, marked up to illustrate the alterations to all
structural, architectural, mechanical, electrical, and HVAC systems required to
accommodate the proposed substitution or deviation '
'
�
l�J
'
�
'
��
�
'
LJ
'
'
9 A list of installations of the proposed substitution or deviation indicating application,
location, owner and date of first use
Upon receipt of written application for substitution or deviation from the Contractor, including
the mformation specified above, the City wdl estimate the cost of evaluating the request and
present the estimate to the Contractor The Contractor is advised that the estimate is based
upon the best information available to the City at the time, however, the actual cost, based
on time and expense, will be documented and applied in the final analysis of the substitution
or deviation request If the Contractor wishes to proceed with the request, he shall advise
the City in writmg and submit sufficient additional information as may be requested by the
City No evaluation will take place until such time as the Contractor has agreed to the
estimate in writing and has authorized the City to deduct the actual cost of the evaluation
from monthly progress payments due the Contractor
1-05.5(4) Categories of Submittals
Shop Drawings Per Section 1-06 1
Samples Per Section 1-06 1
Administrative Submittals Submittals that are not Shop Drawmgs or Samples, or that do not
reflect quality of product or method of construction May include, but not be limited to
1 Applications for payment
2 Construction photographs
3 Progress reports
4 Progress schedules
5 Schedule of values
6 Schedule of estimated progress payments
7 Traming matenals
8 Trammg schedules
9 Submittals required by laws, regulations, and governing agencies
' C►ry of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
lll-21
236-1896-113 (01/04)
November 2013
Diws�on 1
�
'
Quality Control Submittals May include, but not be limited to
1 Manufacturer's instructions
2 Certificates/Certifications
a Manufacturer's
b Inspection
3 Governing Agency's
4 Manufacturer's field service reports
5 Manufacturer's test reports
6 Operation and maintenance data
7 Operation and maintenance manuals
8 Quality control plan
9 Reports (inspection and test)
10 Statements of qualifications
11 Test specimens
Submittals (Product Data) for information Only Required Submittals (Product Data) for
Information Only are not sub�ect to submittal review procedures and shall be provided where
specified as part of the work under this contract and its acceptabdity determined under
normal inspection procedures
1-05.5(5) Subm�ttal Transmittal Procedure
When the Contract Documents require a submittal, the Contractor shall submit the specified
information to the designated City representative via e-mail in Adobe PDF format
Unless otherwise specified, submittals shall be accompanied by transmittal forms to be
provided by City A separate form shall be used for each specific item, class of material,
equipment, and items specified m separate, discrete sections, for which the submittal is
required The form shall be signed by the Contractor's review or authorized representative
Submittal documents common to more than one piece of equipment shall be identified with
all the appropriate equipment numbers Submittals for various items shall be made with a
single form when the items taken together constitute a manufacturer's package or are so
functionally related that expediency indicates checking or review of the group or package as
a whole
A unique number, sequentially assigned, shall be noted on the transmittal form
accompanymg each item submitted Origmal submittal numbers shall have the following
format "XXX", where "XXX" is the sequential number assigned by the Contractor
Resubmittals shall have the following format �XXX-Y", where "XXX" is the ongmally
C�ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements 111-22 November 2013
Contract Documents Division 1
i1
�J
u
'
�
'
assigned submittal number and "Y" is a sequential letter assigned for resubmittals, i e, A, B,
or C being the 1 st, 2nd, and 3rd resubmittals, respectively Submittal 025—B, for example, is
the second resubmittal of submittal 025
Submittals which are mcomplete and/or do not have all the information required to be
submitted, including but not limited to a signed and dated submittal transmittal form, and
copy of marked-up speafications and/or drawmgs when specified , are not acceptable and
will be returned without review All submittal information provided by subcontractors shall be
transmitted through the Contractor and shall bear the Contractor's signature
1-05.5(6) Submittal Review Procedure
� Unless otherwise specified, within 14 calendar days after receipt of a submittal for review
and comment, the City shall rev�ew the submittal and return the reviewed copy with the
transmittal cover sheet via e-mad in Adobe PDF format
,
'
'
�
'
'
�
�
'
�
If the review indicates that the material or equipment complies with the pro�ect
manual, submittal copies wdl be marked "NO EXCEPTIONS TAKEN " In this event,
the Contractor may begin to incorporate the material or equipment covered by the
submittal
2 If the review indicates limited corrections are required, copies will be marked "MAKE
CORRECTIONS NOTED " The Contractor may begin mcorporating the material and
equipment covered by the submittal in accordance with the noted corrections Where
submittal information wdl be incorporated m O&M data, a corrected copy shall be
provided
3 If the review reveals that the submittal is insufficient or contains incorrect data,
copies will be marked AMEND AND RESUBMIT Except at his own risk, the
�� »
Contractor shall not undertake work covered by this submittal until it has been
revised, resubmitted and returned marked either "NO EXCEPTIONS TAKEN" or
"MAKE CORRECTIONS NOTED "
4 if the review mdicates that the matenal, equipment, or work method does not comply
with the Contract Documents, copies of the submittal will be marked "REJECTED -
SEE REMARKS " Submittals with deviations which have not been identified clearly
may be re�ected Except at his own risk, the Contractor shall not undertake the work
covered by such submittals untd a new submittal is made and returned marked either
"NO EXCEPTIONS TAKEN" or "MAKE CORRECTIONS NOTED "
5 If the review indicates that the submittal is Product Data or a Required Submittal
(Product Data) for Information Only the submittal wdl be marked "PRODUCT
DATA/NOT REVIEWED Acceptabdity of the material, equipment, or work shall be
determmed under normal inspection procedures
1-05.5(6)A Effect of Review of Contractor's Submittals
Review of drawings or information regarding materials or equipment the Contractor
' proposes to provide, shall not relieve the Contractor of his responsibility for errors therein
and shall not be regarded as an assumption of risks or liabdity by the City, or by any
, C�tyof Bremerton 236-1896-113 (01/04)
Washington Avenue Sewer Improvements lll-23 November 2013
Contract Documents D�v�sion 1
�
delegated representative, officer or employee thereof, and the Contractor shall have no
claim under the contract on account of the failure, or partial failure, of material, or equipment
so reviewed A mark of "NO EXCEPTIONS TAKEN" or "MAKE CORRECTIONS NOTED"
shall mean that the City has no ob�ection to the Contractor, upon his own responsibility,
using the plan or method of work proposed, or providing - the materials or equipment
proposed
Approval of shop drawings or other submittals by the City is only for general conformance
with the design concept of the product and general compliance with the Contract
Documents Any action required is sub�ect to the requirements of the Plans and
Specifications The Contractor is responsible for dimensions which shall be confirmed and
correlated at the �ob site, coordmation of his work with that of all other trades, and the
satisfactory performance of his work
1-05.5(7) Required Submittals
The Contractor shall provide the City all required submittals identified m the Special
Provisions and Standard Specifications Sections, or shown on Contract Plans, which shall
include, but not be limited to
1-05.5(7)A Submittals for the Pre-construction Conference
The following items shall be submitted at the pre-construction conference prior to the Notice
to Proceed For each item, submit 3 hard copies and an electronic copy on a CD-ROM disk
1 Contractor's and Subcontractor's Contact Information - Names and 24-hour contact
telephone numbers of contractor's and each subcontractor's key personnel identified
m Standard Specifications Section 1-05 13 Electronic copy shall be in MS Word
2 Contractor's Labor Classifications and Rates Classification of all workers to be
employed by the Contractor and its subcontractors in the work, excluding the
Contractor's Superintendent and General Foremen (if any), and, straight-time and
overtime Weighted Wage Rates for each submitted labor classification, computed as
required in Standard Specification Section 1-09 6 Update and resubmit the entire
labor classification file whenever worker classifications are changed, added or
deleted Electronic copy shall be in MS Excel
3 Contractor's EQUiqment Classifications and Rates Make and model of each item of
equipment and small tools to be employed by the Contractor and its subcontractors
in the work, and, working and standby (idle) hourly rates for each submitted item of
equipment, computed as required by Standard Specification Section 1-09 6 and the
AGC/WSDOT Equipment Rental Rate Agreement referenced therein Update and
resubmit this entire equipment classification fde whenever equipment or small tools
classifications are changed, added or deleted Electronic copy shall be in MS Excel
4 Contractor's Procaress Schedule (Tvpe B) Progress schedule identified in Special
Provisions Section 1-08 3(2)A Format shall be Primevera SureTrak or MS Pro�ect
C�ty of Bremerton 236-1896-113 (01/04)
Washmgton Avenue Sewer Improvements lll-24 November 2013
Contract Documents D�v�s�on 1
,
�
'
�
�
'
'
'
5 Master Submittal Control Spreadsheet List all required submittals in an Excel
Spreadsheet, with assigned number, reference, description, review status, and
comments The City wdl review and comment on the document for revisions by the
Contractor The spreadsheet shall be reviewed at each meeting to ensure timely
submission and review of the submittal documentation
6 Cost breakdown for lump sum items, if applicable
7 List of all Subcontractors, including
a Percentage value of work assigned
b Principal contact(s)
c Address
d Telephone and fax numbers
8 List of all requested exceptions to the Contract Documents
1-05 5(7)B Construction Submittals
The followmg items shall be submitted, as applicable, at least three weeks prior to the
' associated construction activity to allow ample time for review and resubmittal if necessary
• Catalog information and data sheets for all materials to be installed on pro�ect
' • Erosion Control Plans
• Mobilization and Stagmg Plan
' • Temporary Traffic Control Plans
• Bypass Sewer Pumping Plan
' • Slip-Lirnng Construction Plan
• Certification for Traffic Control Supervisor (TCS)
• Manufacturer's cert�fication for trench boxes to be utilized
' • Any other construction-related submittal identified elsewhere in the Contract
Documents
�
1-05.5(7)C Additional Administrative Submittals
The following admmistrative submittals shall be submitted when noted
' • Retainage account information — Submit prior to first invoice
• Intent to Pay Prevailing Wage Rates for prime contractor and subcontractors —
' Submit prior to issuance of Notice to Proceed
• Certified Payrolls — Submit weekly
• Affidavit of Wages Paid — Submit upon completion of Work
� • Additional submittals where identified in the Contract Documents and as requested
by the Engineer
' C�ty of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
111-25
236-1896-113 (01/04)
November 2013
D�ws�on 1
1
1-05.7 Removal of Defective and Unauthorized Work
�.*.***�
Supplement this section with the following
If the Contractor fads to remedy defective or unauthorized work within the time specified in a
written notice from the Engmeer, or fads to perform any part of the work required by the
Contract Documents, the Engineer may correct and remedy such work as may be identified
in the written notice, with Contracting Agency forces or by such other means as the
Contracting Agency may deem necessary
If the Contractor fads to comply with a written order to remedy what the Engineer determines
to be an emergency situation, the Engineer may have the defective and unauthonzed work
corrected immediately, have the re�ected work removed and replaced, or have work the
Contractor refuses to perform completed by usmg Contracting Agency or other forces An
emergency situation is any situation when, in the opinion of the Engineer, a delay in its
remedy could be potentialiy unsafe, or might cause serious risk of loss or damage to the
public
Direct or indirect costs mcurred by the Contractmg Agency attributable to correcting and
remedying defective or unauthorized work, or work the Contractor faded or refused to
perform, shall be paid by the Contractor Payment wdl be deducted by the Engmeer from
monies due, or to become due, the Contractor Such direct and indirect costs shall include in
particular, but without limitation, compensation for additional professional services required,
and costs for repair and replacement of work of others destroyed or damaged by correction,
removal, or replacement of the Contractor's unauthorized work
No ad�ustment in contract time or compensation will be allowed because of the delay m the
perFormance of the work attributable to the exercise of the Contracting Agency's rights
provided by this Section
The rights exercised under the provisions of this section shall not dimirnsh the Contracting
Agency's right to pursue any other avenue for additional remedy or damages with respect to
the Contractor's failure to perForm the work as required
1-0510 Guarantees
�:#:...�
Section 1-05 10 is supplemented with the following
If withm one year after the date of Substantial Completion or such period as may be
prescnbed by Laws or Regulations or by the terms of any applicable special guarantee
required by the Contract Documents or by any specific provision of the Contract Documents,
any Work is found to be defective, Contractor shall within seven (7) days of receiving written
notice, without cost to City, (i) remove it from the site and replace it with Work that is not
defective, and (n) satisfactordy correct or remove and replace any damage to other Work or
the works of others resultmg there from If Contractor does not promptly comply with the
terms of such mstructions, or in an emergency where delay would cause serious risk of loss
or damage, City may have the defective Work corrected or the re�ected Work removed and
replaced, and all claims, costs, losses and damages caused by or resulting from such
removal and replacement (including but not limited to all costs of repair or replacement of
work of others) will be paid for by Contractor
C�ty of eremerton
Washmgton Avenue Sewer Improvements
Contract Documents
11/-26
236-1896-113 (01/04) �
November 2013
D�vision 1
'
'�
,
�I
�.J
,
�
Where defective Work (and damage to other Work resulting therefrom) has been corrected,
removed or replaced under this paragraph, the Warranty Period hereunder with respect to
Work wdl be extended for an additional period of one year after such correction or removal
and replacement has been satisfactordy completed
1-05.11 Final inspection
/+k+kM+ki*�
�
Replace Section 1-05 11 with the following new Subsections 1-05 11(1) and 1-05 11(2)
1-05.11(1) Substantial Completion Date (NEW SECTION)
, When the Contractor considers the work to be substantially complete, the Contractor shall
so notify the Engineer m writmg and request the Engineer to establish the Substantial
Completion Date The Contractor's request shall list the specific items of work that remain to
be completed in order to reach physical completion The Engineer will schedule an
� inspection of the work with the Contractor to determine the status of completion The
Engineer may also establish the Substantial Completion Date unilaterally
'
,
�
'
'
If, after this mspection, the Engineer concurs with the Contractor that the work is
substantially complete and ready for its intended use, the Engineer, by written notice to the
Contractor, will set the Substantial Completion Date If, after this inspection the Engineer
does not consider the work substantially complete and ready for its intended use, the
Engmeer wdl, by written notice, so notify the Contractor giving the reasons therefore
Upon receipt of written notice concurring in or denying substantial completion, whichever is
applicable, the Contractor shall pursue vigorously, ddigently and without unauthorized
interruption, the work necessary to reach Substantial and Physical Completion The
Contractor shall provide the Engineer with a revised schedule indicating when the
Contractor expects to reach substantial and physical completion of the work
The above process shall be repeated until the Engineer establishes the Substantial
Completion Date and the Contractor considers the work physically complete and ready for
final inspection
1-05.11(2) Final Inspection and Physical Completion Date
1 The Contractor shall notify the City in wnting at least 3 workmg days prior to completion of all
work and shall certify that all items have been accomplished and ready for final inspection If
all items are not completed and ready for final inspection, no inspection wdl be made at that
, time and the Contractor shall reimburse the City for the Engineer's and inspector's fees
Engineer and inspector fees are based on labor and material costs, overhead, and profit
The Contractor shall reschedule the final inspection as indicated above
' When the Contractor considers the work physically complete and ready for final mspection,
the Contractor by written notice, shall request the Engineer to schedule a final mspection
The Engineer wdl set a date for final inspection The Engineer and the Contractor will then
' make a final inspection and the Engineer will notify the Contractor in writing of all particulars
in which the final inspection reveals the work mcomplete or unacceptable The Contractor
shall immediately take such corrective measures as are necessary to remedy the listed
deficiencies Corrective work shall be pursued vigorously, diligently, and without interruption
' until physical completion of the listed deficiencies This process will continue untd the
Engineer is satisfied the listed deficiencies have been corrected
, C�ry of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documen[s
lll-27
236-1896-113 (Ol/04)
November 2013
D�v�sion 1
'
If action to correct the listed deficiencies is not initiated within 7 days after receipt of the
written notice listing the deficiencies, the Engineer may, upon written notice to the
Contractor, take whatever steps are necessary to correct those deficiencies pursuant to
Section 1-05 7 The Contractor wdl not be allowed an extension of contract time because of
a delay in the performance of the work attributable to the exercise of the Engineer's right
hereunder
Upon correction of all deficiencies, the Engineer will notify the Contractor and the
Contracting Agency, m writing, of the date upon which the work was considered physically
complete That date shall constitute the Physical Completion Date of the contract, but shall
not imply acceptance of the work or that all the obligations of the Contractor under the
contract have been fulfilled
1-05.12 Final Acceptance
�*****.�
Delete the third and fourth sentences of the first paragraph of Section 1-05 12
1-05.14 Cooperation With Other Contractors
�.*.***�
Supplement this section with the followmg
CenturyLink intends to construct a new telecommunications conduit along
Sheldon Boulevard between Cogean Avenue and Pacific Avenue as shown on the Plans
Contractor shall give 2 weeks' notice to City of when this area wdl be available for
installation of the new conduit CenturyLink wdl need three (3) days for construction
Installation of the telecommunications conduit shall occur prior to placement of the geogrid
reinforcement fabnc
CenturyLink Contact is Dan O'Toole, (360/478-4423), Dan OToole@CenturyLink com
�******�
Add the following new section
1-05.16 Water and Power (NEW SECTION)
The Contractor shall make necessary arrangements, and shall bear the costs for power and
water necessary for the perFormance of the work, unless the contract includes power and
water as a pay item -
Water may be obtained from the Owner's hydrants No charge for water will be made unless
there is obvious waste The Contractor wdl be required to deposit $2,000 00 for use of a
hydrant meter and backflow preventer assembly with the Owner The deposit wdl be
refunded upon return of the undamaged meter/backflow preventer assembly Application
and deposit for a water meter shall be done at the Department of Community Development
(DCD) on the 6th floor of the Norm Dicks Government Center at 345 6th Street City Public
Works staff wdl then install the meter at a location requested by the Contractor
C�ty of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documents
111-28
236-1896-113 (01/04) �
November 2013
D�v�s�on 1
'
'
'
,
�:#***.�
Add the followmg new section
1-05.17 Oral Agreements (NEW SECTION)
' No oral agreement or conversation with any officer, agent, or employee of the Contracting
Agency, either before or after execution of the contract, shall affect or modify any of the
terms or obligations contained in any of the documents comprising the contract Such oral
agreement or conversation shall be considered as unofficial information and in no way
' binding upon the Contracting Agency, unless subsequently put in writing and signed by the
Contractmg Agency
� 1-06
1-06.1
'
'
�
�
�
L�
'
,
�
'
,
�
CONTROL OF MATERIAL
Approval of Materials Prior To Use
�******�
Supplement this section with the following
Shop Drawings In addition to notification of matenal suppliers and fabricators, the Contractor
shall also furnish for the Engineer's review and approval all required shop drawings
Shop drawings are defined as drawings or data, which dlustrate how specific items, shall be
fabricated, manufactured, or installed Shop drawings are required for all shop, field
fabricated or manufactured items and shall include all mformation necessary for the
fabncation and installation of the item and to show conformance with these contract
documents The information shall include, but not be limited to
For fabricated items or those constructed in place, component sizes, layout,
materials, and connection details including, but not limited to, connectors, weld type,
reinforcement schedules and sizes, and boring and Jacking equipment
2 Shop drawmgs for reinforced concrete structures shall include, but not be limited to,
reinforcement bending and placing drawings
3 Piping Fabrication and Placement Drawings
4 Erection Drawings
5 Diagrams, Illustrations and Data (product, design, or other)
Manufacturers' standard catalog information and details maybe submitted, however,
standard manufacturers' information and advertismg literature may not necessarily be
sufficient
Samples are Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and which establish the standards by which such
portion of the Work wdl be �udged Samples submitted shall be of sufficient size and quantity
to clearly illustrate functional characteristics of products or materials and full range of colors
available
Shop drawings and samples shall be submitted in accordance with Section 1-05 5
C�ty of Bremerton 236-1896-113 (01/04)
Washmgton Avenue Sewer Improvements lll-29 November 2013
Contract Documents D�v►s�on 1
C J
1-07
1-07.1
LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC
Laws to be Observed
(October 1, 2005 APWA GSP)
Supplement this section with the following
In cases of conflict befinreen different safety regulations, the more stringent regulation shall
aPP�Y
The Washington State Department of Labor and Industnes shall be the sole and paramount
administrative agency responsible for the administration of the provisions of the Washington
Industrial Safety and Health Act of 1973 (WISHA)
The Contractor shall maintain at the pro�ect site office, or other well-known place at the
pro�ect site, all articles necessary for providing first aid to the in�ured The Contractor shall
establish, publish, and make known to all employees, procedures for ensuring immediate
removal to a hospital, or doctor's care, persons, including employees, who may have been
in�ured on the pro�ect site Employees should not be permitted to work on the pro�ect site
before the Contractor has established and made known procedures for removal of in�ured
persons to a hospital or a doctor's care
The Contractor shall have sole responsibdity for the safety, efficiency, and adequacy of the
Contractor's plant, appliances, and methods, and for any damage or in�ury resulting from
their failure, or improper maintenance, use, or operation The Contractor shall be solely and
completely responsible for the conditions of the pro�ect site, includmg safety for all persons
and property m the performance of the work This requirement shall apply contmuously, and
not be limited to normal workmg hours The required or implied duty of the Engineer to
conduct construction review of the Contractor's perFormance does not, and shall not, be
intended to include review and adequacy of the Contractor's safety measures m, on, or near
the pro�ect site
1-07.2 State Taxes
Replace Section 1-07 2, including its subsections, with the following
1-07 2 State Sales Tax
(June 27, 2011 APWA GSP)
The Washington State Department of Revenue has issued special rules on the State sales
tax Sections 1-07 2(1) through 1-07 2(3) are meant to clarify those rules The Contractor
should contact the Washington State Department of Revenue for answers to questions in
this area The Contractmg Agency will not ad�ust its payment if the Contractor bases a bid
on a misunderstood tax liability
The Contractor shall include all Contractor-paid taxes in the unit bid pnces or other contract
amounts In some cases, however, state retail sales tax wdl not be included Section 1-07 2(2)
describes this exception
C►ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements Ill-30 November 2013
Contract Documents D�vis�on 1
�
�
'
'
L
��
,
,
'
The Contracting Agency will pay the retained percentage (or release the Contract Bond if a
FHWA-funded Pro�ect) only if the Contractor has obtained from the Washington State
Department of Revenue a certificate showing that all contract-related taxes have been paid
(RCW 60 28 051) The Contracting Agency may deduct from its payments to the Contractor
any amount the Contractor may owe the Washington State Department of Revenue,
whether the amount owed relates to this contract or not Any amount so deducted wdl be
paid into the proper State fund
1-07.2(1) State Sales Tax — Rule 171
WAC 458-20-171, and its related rules, apply to budding, repairing, or improving streets,
roads, etc , which are owned by a murncipal corporation, or political subdivision of the state,
or by the United States, and which are used primarily for foot or vehicular traffic This
includes storm or combmed sewer systems within and mcluded as a part of the street or
road dramage system and power lines when such are part of the roadway lighting system
For work perFormed in such cases, the Contractor shall include Washmgton State Retad
Sales Taxes in the various urnt bid item prices, or other contract amounts, mcludmg those
that the Contractor pays on the purchase of the materials, equipment, or supplies used or
consumed m domg the work �
Rule 171 applies to Bid Schedule A
1-07.2(2) State Sales Tax — Rule 170
WAC 458-20-170, and its related rules, apply to the constructing and repairing of new or
' existing buddings, or other structures, upon real property This mcludes, but is not limited to,
the construction of streets, roads, highways, etc , owned by the state of Washington, water
mains and their appurtenances, sanitary sewers and sewage disposal systems unless such
' sewers and disposal systems are within, and a part of, a street or road drainage system,
telephone, telegraph, electrical power distribution lines, or other conduits or lines in or above
streets or roads, unless such power lines become a part of a street or road lighting system,
, and mstallmg or attachmg of any article of tangible personal property in or to real property,
whether or not such personal property becomes a part of the realty by virtue of installation
'
'
For work performed in such cases, the Contractor shall collect from the Contracting Agency,
retad sales tax on the full contract price The Contracting Agency wdl automatically add this
sales tax to each payment to the Contractor For this reason, the Contractor shall not
include the retail sales tax in the unit bid item prices, or in any other contract amount sub�ect
to Rule 170, with the following exception
Exception The Contractmg Agency will not add in sales tax for a payment the Contractor or
' a subcontractor makes on the purchase or rental of tools, machmery, equipment, or
consumable supplies not integrated into the pro�ect Such sales taxes shall be included in
the unit bid item prices or in any other contract amount
�
�J
Rule 170 applies to Bid Schedules B and C
, C�ty of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documents
111-31
236-1896-113 (01/04)
November 2013
D�v�s�on 1
'
1-07.2(3) Services
The Contractor shall not collect retad sales tax from the Contracting Agency on any contract
wholly for professional or other services (as defined in Washington State Department of
Revenue Rules 138 and 244)
1-07.5
1-07 5(2)
Environmental Regulations
State Department of Wildlife and Fisheries
�.****:��
Delete the last paragraph and replace with the following
Work in all items (1) through (8) above shall be incidental to other contract pay items
1-07.6 Permits and Licenses
�*..**��
Section 1-07 6 is supplemented with the following
The City has applied for and obtained approval for the followmg permits
o SEPA Determination of Non-Sigrnficance
• Shoreline Exemption
The City is currently obtaining a Hydraulic Pro�ect Approval (HPA) from WDFW to allow for
the work on the beach of cutting and capping sewer laterals The permit wdl have speafic
requirements for how and when work may occur on the beach HPAs typically do not allow
work to occur before June 15 of any calendar year and trenches must be backfilled dady
The Contractor shall obtain all other required permits and licenses These include the sewer
connection permits for each grinder pump station service, which will be issued by the City,
includmg electrical and L&I permits
1-07 13
1-07 13(1)
Contractor's Responsibility for Work
General
�**...*�
Section 1-07 13(1) is supplemented with the following
It shall be the responsibility of the Contractor to coordinate all work to be performed under
this Contract, including the ordering and acquisition of all equipment and materials This
coordination shall encompass all work to be performed by the Contractor, their
subcontractor, the City of Bremerton and any public utdities that may be involved
The Contractor shall submit a performance bond in accordance with the City of Bremerton,
State of Washington, Public Works performance and payment bond requirements The
performance bond shall be in the full amount of Contract
Whether or not there appears here or elsewhere herein specific reference to guarantees of
all items of materials, equipment, and workmanship, they nevertheless shall be so
guaranteed against mecharncal, structural, or other defects for which the Contractor is
C�ty of Bremerton 236-1896-113 (01/04)
Wash�ngton Avenue Sewer Improvements lll-32 November 2013
Contract Documents D�v�s�on 1
1
[�
�
'
'
'
responsible that may develop or become evident within a period of one year from and after
acceptance of the work by the City Such guarantees shall include care of backfillmg of
ditches or at structures should the fdl settle to such extent as to require refilling or
resurfacing roadway surfaces to restore the original or intended condition or grade
This guarantee shall be understood to imply prompt attention to any remedy of such defects
as those mentioned above if and as they occur after the Contractor shall have written notice
of their existence If the defect, in the opinion of the City, is of such nature as to demand
immediate repair, the City shall have the nght to correct and cost thereof shall be borne by
the Contractor
To support the above guarantee, the Contractor's performance bond shall remain in full
force and effect for one year followmg the acceptance of the Pro�ect by the City The bond
shall be executed by a surety company authorized to do business within the State of
Washington and it shall be sub�ect to the approval of the attorney for the City
' 1-07.15 Temporary Water Pollution/Erosion Control
'
'
LJ
�
i� l
U
�
�
,
'
'
�..**:*�
Section 1-07 15 is supplemented with the following
Contractor shall take necessary measures to prevent sdtation of downstream facilities,
ad�acent properties and Washington Narrows, Puget Sound When submitting erosion
control plan as outlined in the Standard Specification the Contractor shall address the
following items
1 Protection of existing storm sewer system
2 Disposal of water from dewatering systems
3 Disposal of water from normal trench dewatenng
1-07.15(1) Spill Prevention, Control, and Countermeasures Plan
�***x»*�
Section 1-07 15(1) is supplemented with the following
All costs associated with the SPCC plan shall be included m the lump sum price for
"Mobilization" and will mclude
1 All costs associated with developing the SPCC plan
2 All costs associated with providing and mamtaining on-site standby materials and
equipment described in the SPCC plan
Costs associated with cleanup of spols resultmg from Contractor's operations, negligence, or
omissions shall not be measured for payment
' City of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
lll-33
236-1896-113 (01/04)
November 2013
D►ws�on 1
IJ
1-07.16 Protection and Restoration of Property
1-07.16(1) Private/Public Property
�**.*.*�
Section 1-07 16(1) is supplemented with the following
Asphalt concrete pavement or bituminous surFacing outside the pro�ect area that is disturbed
by the work shall be restored to its original condition Asphalt pavement restoration shall
comply with the provisions of Section 5-04 (Hot Mix Asphalt) of the Standard Specifications
All other surfaces, madboxes, fences, signs, etc , disturbed by the pro�ect shall be promptly
replaced or relocated to original or better than condition
The Contractor shall restore all disturbed landscaping in conformance with Section 8-02
(Roadside Restoration) �
i
All costs associated with Protection and Restoration of Property, as described under
Section 107 16, shall be mcluded in the lump sum price for "Mobdization", except for private
property restoration associated with construction of the individual grinder pump stations
��*.***�
Add the followmg new subsections
1-07.16(1)A Lot Corners or Permanent Control Points (NEW SECTION)
All lot corners or corners of tracts, section corners or permanent markers of subdivisions
therein as well as street monuments and right-of-way monuments shall be carefully noted
and maintained by the Contractor Some monuments are shown on the Plans and there may
be others The Contractor shall notify the Engineer of any existmg federal, state, county,
city, and private land monuments encountered prior to pipeline construction The Contractor
shall preserve such monuments mtact and undisturbed or they shall be referenced by a land
surveyor licensed to practice in the State of Washington prior to any disturbance Any such
pin, pipe, stone, plaque, or monument that is removed or disturbed by the Contractor shall
be accurately located and replaced by a licensed surveyor at the expense of the Contractor
Replacement of survey monuments and lot corners shall conform in all respects to the
requirements of RCW 58 09 and Chapter 332 120 WAC Applicable permits as required by
the Washington Department of Natural Resources shall be obtained by the contractor's
surveyor This work shall be incidental to Contract pay items
The City will provide copies of Records of Survey to the Contractor prior to, construction for
the contractor's use in protecting monument, corners, and other markers
1-07 16(1)B Preconstruction Photographs (NEW SECTION)
The City will take preconstruction photographs immediately prior to construction irntiation in
order to provide a substantiated record of the condition of existing improvement These
photographs shall be considered as indicative of the nature of the original improvements in
determirnng the adequacy or inadequacy of restoration
In addition, the Contractor may also wish to document the existing conditions for themselves
in the event of a claim situation from an ad�acent property owner
City of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer lmprovements 111-34 November 2013
Contract Documents D�v�sion 1
'
'
1-07 16(3) Fences, Mailboxes, Inc�dentals
'
'
II
'
'
�
'
i
'
�J
�
�***:�*�
Add the following new subsection
1-07 16(3)A Easements and Permits (NEW SECTION)
Where portions of the work are located on public or private property, easements and permits
have been or shall be obtamed by the City, including easements for the designated
long-term and short-term construction areas Easements wdl provide for the use of property
for construction purposes to the extent indicated on the easements Copies of these
easements and permits are avadable upon request to the City It shall be the Contractor's
responsibility to determine the adequacy of the easement obtained in every case and to
abide by all requirements and provisions of the easement The Contractor shall confine his
construction operations to within the easement limits or street right-of-way limits or make
special arrangements with the property owners, tenants, and/or appropriate public agency
for the additional area required Any damage to property, either inside or outside the limits of
the easements provided by the City, shall be the responsibility of the Contractor as specified
herein Before final payment wdl be authorized by the Engineer, the Contractor wdl be
required to furnish the City with written releases from property owners or public agencies
where side agreements, or special easements have been made by the Contractor or where
the Contractor's operations, for any reason, have not been kept withm the construction
right-of-way obtained by the City
1-07.17 Utilities and Similar Facilities
�.**..*�
Supplement this section by including the followmg new subsections
1-07.17(3) Underground Utilities (NEW SECTION)
Known utilities and structures ad�acent to or encountered m the work are shown on the
drawings The locations shown are based upon existing records and the best information
available from existing utility plans However, there may be some discrepancies and
omissions in the locations and quantities of utdities and structures shown Those shown are
for the convernence of the Contractor, and no responsibility is assumed by either the City or
the Engineer for the accuracy of their location, existence or completeness
No excavation shall commence untd underground facilities have been located
Contractor shall use reasonable care, including precisely locating known underground
' facilities If an urndentified underground facdity is encountered, the excavator shall cease
digging in the vicmity and notify the Engineer, City and the affected facdity owner In case
there is damage, the excavator shall, additionally, take public safety measures, if required
' Damaged underground facdities shall not be buried, relocated and/or repaired, prior to
mspection by the City and the affected facdity owner
In accordance with and as defined by RCW 19 122, emergency excavations are exempt
' from the time requirements "Emergency" includes customer service outage
Provide temporary support for all existing underground utilities when they are exposed and
, suspended in the excavation
Reference Section 7-08 3(5) for requirements for potholing of existing utilities
' City of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements lll-35 November 2013
Contract Documents Divis�on 1
,
1-07.17(4) Contractor's Responsibility for Utilety Properties & Services (NEW SECTI011Q
Where the Contractor's operations could cause damage or inconvernence to railway,
telegraph, telephone, television, power, oil, gas, water, sewer, storm sewer, or irrigation
systems, operations shall be suspended untd all arrangements necessary for the protection
of these utilities and services have been made by the Contractor
The Contractor shall protect, m place, all radway, telegraph, telephone (including poles, guy
wires and anchors), television, power (includmg poles, guy wires, and anchors), oil, gas,
water, sewer, storm sewer, or irngation systems from damage If interfering radway,
telegraph, telephone (including poles, guy wires, and anchors), television, power (mcluding
poles, guy wires, and anchors), oil, gas, water, sewer, storm sewer, or irrigation systems are
encountered notify the Engineer and the appropriate utility company at least two (2) workmg
days in advance of construction operations to permit the necessary arrangements for
protection or relocation of the interfering structure The Contractor shall pay all costs of
protecting and/or relocation of such facdities
In the event of interruption to domestic water, sewer, storm drain, or other utdity services as
a result on accidental breakage due to construction operations, the Contractor shall
promptly notify the proper authority, cooperate with said authority in restoration of service as
promptly as possible and bear all associated costs of repair sub�ect to determination of
responsibility In no case shall interruption of any water or utdity service be allowed to exist
outside working hours unless prior approval is granted All costs of repairing utdities
interrupted or uprooted, replacing driveway and roadside culverts, fences, guard posts,
landscape shrubs, traffic signs, and mailboxes shall be considered incidental
In the event the Contractor encounters water and sewer service lines that interfere with
trenching or that must be relocated to avoid the new pipeline, the services may be cut, and
the trench dug through, only after obtairnng prior approval of the Water Department,
Engineering Department, or Fire Department, as applicable, and the Engineer All work and
repairs to the water system shall be performed by City forces only The services will be
restored with similar or equal materials
The Contractor shall replace, at his own expense, any and all other existing utilities or
structures removed or damaged during construction, unless otherwise provided for m these
Contract Documents or ordered by the Engineer
Existing water mams are generally buried at 3' depth from the ground surFace to the top of
pipe
The Contractor shall take every possible precaution to preserve the existing improvements
All damages to existing improvements from the Contractor's operation, whether within the
road right-of-way or in pnvate property, shall be the sole responsibility of the Contractor to
remedy The Engineer wdl review the pre-construction photographs for confirmation of
possible damage by the Contractor's activities All such areas identified by the Engineer
shall be restored to their preconstruction equivalent to the satisfaction of the Owner
C�ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
111-36
236-1896-113 (O7/04) �
November 2013
D�v�sion 1
�
��
'
1-07.17(5) List of Utility Owners (NEW SECTION)
' Following is a list of the utilities serving the work area indicating the name (if avadable) and
telephone number of the responsible authority of the various utilities which should be
notified if conflicts or emergencies arise during the progress of the work Outside normal
' working hours, report emergencies and irntiate contact with the appropnate individual by
calling 911
,
t
�
'
�
,
�
UTILITY CONTACT TABLE
UTILITY UTILITY NAME CONTACT TELEPHONE #
W�thin City of Bremerton, Department of Public Works and Utilities (PWU)
Storm and PWU Pat Jacobsen 473-5920
Sanitary Sewers Ned Lever 473-2398
Water PWU Bob Zurbrugg 473-5920
Ned Lever 473-2398
Streets PWU Jim Orton 473-5359
Gunnar Fridriksson 473-2354
Contact C�ty Engrneer Tom Knuckey at 473-2376 if unable to contact PWU �ndiwduals above
OTHER UTILITIES
Power Pu et Sound Ener Dis atcher 888-225-5773
Tele hone Centu Link Re air De t 800-573-1311
Gas Cascade Natural Gas Mike Dunn 479-3966
Cable TV Comcast Jerry Biggs 377-8528
415-2477 a er
Fiber O tic Conver ence John Stockwell 425-213-6016 }
Under round Utilities Locate Service 800-424-5555
Note A/l numbers are (360) refix unless noted otherw�se
� 1-07.18 Public Liability and Property Damage Insurance
'
�
�
�
�
r -,
�,�
�.
Delete this section in its entirety, and replace it with the following
1-07 18 Insurance
(January 24, 2011 APWA GSP)
1-07.18(1) General Requirements
A The Contractor shall obtain the insurance described in this section from insurers
approved by the State Insurance Commissioner pursuant to RCW Title 48 The
insurance must be provided by an insurer with a rating of A- VII or higher in the A M
Best's Key Rating Guide, which is licensed to do business in the state of Washington (or
issued as a surplus line by a Washington Surplus lines broker) The Contracting Agency
reserves the right to approve or re�ect the insurance provided, based on the msurer
(including financial condition), terms and coverage, the Certificate of Insurance, and/or
endorsements
' City of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
lll-37
236-1896-113 (O7/04)
November 2013
D►vis�on 1
'
B The Contractor shall keep this msurance in force dunng the term of the contract and for
thirty (30) days after the Physical Completion date, unless otherwise indicated (see
C below)
C If any insurance policy is written on a ciaims made form, its retroactive date, and that of
all subsequent renewals, shall be no later than the effective date of this Contract The
policy shall state that coverage is claims made, and state the retroactive date Claims-
made form coverage shall be maintamed by the Contractor for a minimum of 36 months
following the Final Completion or earlier termination of this contract, and the Contractor
shall annually provide the Contracting Agency with proof of renewal If renewal of the
claims made form of coverage becomes unavailable, or economically prohibitive, the
Contractor shall purchase an extended reporting period ("tail") or execute another form
of guarantee acceptable to the Contracting Agency to assure financial responsibility for
liability for services performed
D The insurance policies shall contain a"cross liability" provision
E The Contractor's and all subcontractors' msurance coverage shall be primary and non-
contributory insurance as respects the Contracting Agency's insurance, self-insurance,
or insurance pool coverage
F The Contractor shall provide the Contractmg Agency and all Additional Insureds with
written notice of any policy cancellation, within two business days of their receipt of such
notice
G Upon request, the Contractor shall forward to the Contracting Agency a full and certified
copy of the insurance policy(s)
H The Contractor shall not begin work under the contract untd the required insurance has
been obtained and approved by the Contracting Agency
Failure on the part of the Contractor to maintain the insurance as required shall
constitute a material breach of contract, upon which the Contracting Agency may, after
giving five business days' notice to the Contractor to correct the breach, immediately
terminate the contract or, at its discretion, procure or renew such insurance and pay any
and all premiums in connection therewith, with any sums so expended to be repaid to
the Contracting Agency on demand, or at the sole discretion of the Contracting Agency,
offset against funds due the Contractor from the Contracting Agency
J All costs for insurance shall be incidental to and included in the unit or lump sum prices
of the contract and no additional payment wdl be made
1-07.18(2) Additionallnsured
All insurance policies, with the exception of Professional Liability and Workers
Compensation, shall name the following listed entities as additional insured(s)
• the City of Bremerton and its officers, elected officials, employees, agents, and
volunteers
• Parametrix, Inc
Crty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements 111-38 November 2013
Contract Documents D�vis�on 1
�
�
�
��,
The above-listed entities shall be additional insured(s) for the full avadable limits of liability
maintained by the Contractor, whether primary, excess, contingent or otherwise, irrespective
of whether such limits mamtained by the Contractor are greater than those required by this
Contract, and irrespective of whether the Certificate of Insurance provided by the Contractor
pursuant to 1-07 18(3) describes limits lower than those mamtained by the Contractor
1-0718(3) Subcontractors
' Contractor shall ensure that each subcontractor of every tier obtains and maintains at a
minimum the insurance coverages listed in 1-07 18(5)A and 1-07 18(5)B Upon request of
the Contracting Agency, the Contractor shall provide evidence of such insurance
u
1-07 18(4) Evidence of Insurance
The Contractor shall deliver to the Contracting Agency a Certificate(s) of Insurance and
' endorsements for each policy of insurance meeting the requirements set forth herein when
the Contractor delivers the signed Contract for the work The certificate and endorsements
must conform to the following requirements
,
1 An ACORD certificate or a form determined by the Contracting Agency to be
equivalent
' 2 Copies of all endorsements naming Contracting Agency and all other entities listed in
1-07 18(2) as Additional Insured(s), showmg the policy number The Contractor may
submit a copy of any blanket additional insured clause from its policies mstead of a
' separate endorsement A statement of additional insured status on an ACORD
Certificate of Insurance shall not satisfy this requirement
'
�
i�
'
'
'
,
'
3 Any other amendatory endorsements to show the coverage required herein
1-07.18(5) Coverages and Limits
The insurance shall provide the mmimum coverages and limits set forth below Providing
coverage m these stated minimum limits shall not be construed to relieve the Contractor
from liabdity in excess of such limits All deductibles and self-insured retentions must be
disclosed and are sub�ect to approval by the Contracting Agency The cost of any claim
payments falling within the deductible shall be the responsibdity of the Contractor
1-07.18(5)A Commercial General Liability
A policy of Commercial General Liability Insurance, mcluding
• Per pro�ect aggregate
• Premises/Operations Liability
• Products/Completed Operations — for a period of one year followmg final acceptance
of the work
• Personal/Advertising In�ury
• Contractual Liability
• Independent Contractors Liabdity
' C�ry of Bremenon
Washmgton Avenue Sewer Improvements
Contract Documents
lll-39
236-1896-113 (Ol/04)
November 2013
D�v�s�on 1
'
a
• Stop Gap / Employers' Liabihty �
• Explosion, Collapse, or Underground Property Damage (XCU) -
• Blasting (only required when the Contractor's work under this Contract includes
exposures to which this specified coverage responds)
Such policy must provide the following minimum limits
• $1,000,000 Each Occurrence
• $2,000,000 General Aggregate
• $1,000,000 Products & Completed Operations Aggregate
•$1,000,000 Personal & Advertising In�ury, each offence
Stop Gap/Employers' Liabdity
• $1,000,000 Each Accident
• $1,000,000
• $1,000,000
Disease - Policy Limit
Disease - Each Employee
1-07 18(5)B Automobile L�ability
Automobde Liability for owned, non-owned, hired, and leased vehicles, with an MCS 90
endorsement and a CA 9948 endorsement attached if "pollutants" are to be transported
Such policy(ies) must provide the following mirnmum limit
o $1,000,000 combined single limit
1-07.18(5)C Worker's Compensation
The Contractor shall comply with Workers' Compensation coverage as required by the
Industrial Insurance laws of the state of Washington
Add the following new section
1-07.18(5)F Excess or Umbrella Liability (NEW SECTION)
(May 10, 2006 APWA GSP)
The Contractor shall provide Excess or Umbrella Liabdity coverage at limits of one (1) million
per occurrence and annual aggregate This excess or umbrella liability coverage shall apply,
at a minimum, to both the Commercial General and Auto msurance policy coverage
This requirement may be satisfied instead through the Contractor's primary Commercial
General and Automobde Liabdity coverage, or any combination thereof
'
'
t
'
�
,
�
�
�
�
'
�
�
�
, �
�
C�ty of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
lll-40
236-1896-113 (Ol/04) �
November 2013
D�v�sion 1
�
1
i
'
,
'
�
�
,
'
'
C
'
1
l_J
�
'
�
'
Add the following new section
1-07.18(5)G Pollution Liability (NEW SECTION)
(May 10, 2006 APWA GSP)
The Contractor shall provide a Pollution Liabdity policy, providing coverage for claims
involving bodily in�ury, property damage (including loss of use of tangible property that has
not been physically in�ured), cleanup costs, remediation, disposal or other handling of
pollutants, including costs and expenses incurred in the investigation, defense, or settlement
of ciaims ar�smg out of
• Contractor's operations related to this pro�ect, and/or
• Remediation, abatement, repair, mamtenance or other work with lead-based paint or
materials containing asbestos, and/or
• Transportation of hazardous materials away from any site related to this pro�ect
Such Pollution Liability policy shall prowde the following minimum coverage
$1,000,000 each loss and annual aggregate
1-07.23
1-07 23(1)
Public Convenience and Safety
Construction Under Traffic
�.:*..*�
Section 1-07 23(1) is supplemented with the following
The Contractor shall do whatever work is necessary for safety artd be solely and completely
responsible for conditions of the �ob site, including safety of all persons (includmg
employees) and property during the Contract period This requirement shall apply
continuously and not be limited to normal working hours
The Contractor shall at all times provide proper facdities for safe access to the work by
authorized government officials
Work areas shall be barncaded to prevent public access and provide a buffer between the
work zone and the public
GENERAL REQUIREMENTS
The signage and traffic control measures shown on the attached plans are mmimum
requirements meant to show the limits of closure and the nature of the closure for each
general segment, as well as any special access and closure requirements The
Contractor shall ad�ustJsupplement signage and traffic control devices as necessary for
the individual work areas within the segment in conformance with the general
requirements for the segment
At all times, the Contractor shall furnish, install, and maintain additional signage and
other measures to safely route vehicular and pedestnan traffic through the construction
area and protect the public from construction activ�ties during both workmg and
non-working hours �
City of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements 111-41 November 2013
Contract Documents D�ws�on 1
'
2 Pedestnan traffic shall be maintained at all times through the construction area Signage
and flaggers shall be provided to direct pedestrians to ADA-compliant routes during
construction During non-working hours, the Contractor shall also provide ADA-compliant
pedestrian facilities through the work area Appropriate s�gnage, m conformance with the
MUTCD, shall be mstalled to inform pedestnans of sidewalk closures and other
conditions
3 The actual construction area (open trench) shall be limited to a maximum length
of150 feet On-street parking may be prohibited withm this area, however, parking for
local traffic shall be allowed on the roadway up to withm 50 feet each side of the trench
area For construction of the Shallow Sewer Trench, the Contractor is allowed to have
an open trench greater than 150 feet, but shall provide the necessary barricades and/or
trench covering for pedestrian and traffic safety An exception to these requirements
requires written approval from the Owner
4 Where roadways are closed to traffic during working hours and open to traffic during
non-workmg hours, the Contractor shall cover or remove all signage that does not apply
to the existmg condition (open or closed)
5 All signage and traffic control devices installed by the Contractor shall be in accordance
with the MUTCD
6 The Contractor shall not begm work on a segment until the other segments are open to
through traffic The Contractor shall temporardy restore trenches and other excavations
to allow the road to be open to through trafFc Trench restoration shall consist of cold
mix asphalt concrete pavement
7 All additional signage and traffic control measures needed to provide detours, to route
pedestrians and vehicles through the construction area, and to protect the public and
workers shall be furrnshed by the Contractor and the cost thereof incfuded in the lump
sum payment item for the temporary traffic control
SPECIFIC REQUIREMENTS
A SEGMENT 1— Sheldon Boulevard/13th Street (14th Street to Highland Avenue)
1 The entire roadway befinreen 14th Street and Highland Avenue may be closed to
through traffic during the construction period (both workmg and non-workmg hours),
except as follows
a The main entrance and parking area for Evergreen Park is at 14th Street off of
Park Avenue It is critical that this access be mamtained for the public at all
times except when the roadway must be closed due to construction operations
befinreen 14th Street and the park See allowable closures below
b Access to Evergreen Park entrance at the north end of Pacrfic Avenue shall be
mamtained at all times the park is open except when the Contractor is actively
workmg within the mtersection area or on Pacific Avenue
C�ty of Bremerton 236-1896-113 (01/04)
Wash�ngton Avenue Sewer Improvements 111-42 November 2013
Con[ract Documents D�vis�on 1
�
'
1
'
'
�
u
-�
�
�
C
�
'
�
'
�J
'
1
'
�
c Access to one of the park entrances noted in a and b above shall be
mamtained at all times When access to one of the entrances is closed, the
Contractor shall install signage as shown on the plans In addition to the
signage shown, the Contractor shall also furnish and install detour signage, per
the MUTCD, to direct park users to the other open entrance The detour route
shall be along Park Avenue and 11th Street befinreen 14th Street and Pacific
Avenue
d Access to ad�acent properties and businesses, whose sole access is from
Sheldon Boulevard or 13th Street, shall be maintained at all times
Total access closures noted in a and b above shall be permitted only on the approval of
the pro�ect engineer for specific lengths of time described below The Contractor shall
request such approvals at a minimum of 5 working days m advance of the closure The
Contractor shall also furnish and install appropriate signage and other dewces as
necessary to close the roadways
B SEGMENT 2— Highland Avenue (13th Street to 11th Street)
Work shall not begin on SEGMENT 2 untd SEGMENT 1 work has been completed,
and Sheldon Avenue/13th Street is open to traffic See note 6 under GENERAL
REQUIREMENTS
2 The roadway may be closed to through traffic from 13th Street to 11th Street durmg
working hours except that access to ad�acent properties and businesses, whose sole
access is from Highland Avenue, shall be maintained at all times
A detour route shall be established and signed to direct traffic around the
construction area via 13th Street, Pleasant Avenue, and 11th Place Proper detour
signage, mounted on 4-mch by 4-inch wood posts, shall be furnished and installed by
the Contractor durmg working hours and shall be covered during non-working hours
The Contractor shall submit plans for the detour route signage to the City for
approval prior to implementation
Vehicles exiting 11th Place onto Highland Avenue will be directed to turn left only
and exit onto 11th Street
4 During non-workmg hours, the road shall be open to unrestricted finro-way traffic At
the conclusion of each working period, the trench and other excavations shall be
restored to accommodate vehicular traffic Construction equipment and materials
shall be removed from the pro�ect site Appropriate signage and other devices shall
be furnished and installed by the Contractor to protect the public from construction
activities
C SEGMENT 3— Washington Avenue/11th Place (Highland Avenue to STA 8+25t on
Washington Avenue)
1 Work shall not begin on
and Highland Avenue
REQUIREMENTS
C�ty of eremerton
Washington Avenue Sewer Improvements
Contract Documents
SEGMENT 3 untd SEGMENT 2 work has been completed
is open to traffic See note 6 under GENERAL
lll-43
236-1896-113 (01/04)
November 2013
D�v�s►on 1
1
2 The roadways may be closed to through traffic from Highland Avenue to STA 8+25
(EOP) on Washington Avenue durmg working hours except that access to ad�acent
properties and businesses, whose sole access is from Washington Avenue or 11th
Place, shall be mamtamed at all times
3 During non-working hours, the road shall be open to unrestricted traffic At the
conclusion of each working period, the trench and other excavations shall be
restored to accommodate vehicular traffic Construction equipment and materials
shall be removed from the pro�ect site Appropriate signage and other devices shall
be furrnshed and installed by the Contractor to protect the public from construction
activities
D S�DE STREETS — Mckenzie Avenue, Cogean Avenue, Pacific Avenue, Pleasant Avenue
1 During working hours, for installation of the facdities on these roadways, the "ROAD
CLOSED" sign and barricade at the intersection with Sheldon Boulevard shall be
relocated to close the portion of the side street under construction
2 During non-working hours, the barricade shall be relocated to its onginal position at
the intersection and the road shall be open to traffic
1-07.23(2) Construction and Maintenance of Detours
�«**�**�
Delete this section and replace with the following
The construction and maintenance of the detours for Highland Avenue and the park
entrance closures, including tra�c control and signing, is the sole responsibdity of the
Contractor All costs to provide, maintam, and remove the detours shall be included in the
lump sum price for temporary traffic control, and no further compensation will be made
The Contractor shall build, mamtam, and remove all the detours Upon fadure of the
Contractor to immediately provide, maintam, or remove the detours when ordered to do so
by the Engineer, the City may, without further notice to the Contractor or the Surety, provide,
maintain, or remove the detour and deduct the costs from any payments due or coming due
the Contractor
Implementation of the detours shall be coordinated with the Contractor's progress schedule
to indicate when the various elements of the detour wdl be needed The detour shall be in
accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and the
specifications
C�ry of Bremerton
Wash�ngton Avenue Sewer lmprovements
Contract Documents
IIIQI!
236-1896-113 (01/04) �
November 2013
D�v�s�on 1
I�
'
'
'
�*:*:�.�
Add the following new section
1-07.23(3) Communication/Dissemination of Information (NEW SECTION)
' It shall be the Contractor's responsibility to coordinate dady, all construction activities and
scheduling, with local residents, businesses, and the Owner/Engineer for work within the
construction segment Coordination shall include, but not be limited to
�
I �
,
'
'
�
�
a Time and location of all roadway and sidewalk closures (minimum 5 workmg days'
notice)
b Schedule and location of active trench construction and restoration as it affects
parking restrictions and driveway closures (minimum 2 workmg days' notice)
c Schedule and location of all utdity shut-offs to specific properties (mirnmum 5 working
days' notice)
1-07.24 Rights of Way
�.**..*�
Replace Section 1-07 24, m its entirety, with the following
Street right of way lines, limits of easements, and limits of construction permits are indicated
in the Plans The Contractor's construction activities shall be confined within these limits,
unless arrangements for use of private property are made
Generally, the Contracting Agency wdl have obtained, prior to bid opernng, all rights of way
' and easements, both permanent and temporary, necessary for carrying out the work
Exceptions to this are noted in the Bid Documents or wdl be brought to the Contractor's
attention by a duly issued Addendum
,
,
'
�
�
�
Whenever any of the work is accomplished on or through property other than public right of
way, the Contractor shall meet and fulfill all covenants and stipulations of any easement
agreement obtained by the Contracting Agency from the owner of the private property
Copies of the easement agreements may be included in the Contract Provisions or made
avadable to the Contractor as soon as practical after they have been obtamed by the
Engineer
Whenever easements or rights of entry have not been acquired prior to advertising, these
areas are so noted m the Plans The Contractor shall not proceed with any portion of the
work in areas where right of way, easements or rights of entry have not been acquired until
the Engineer certifies to the Contractor that the right of way or easement is avadable or that
the right of entry has been received if the Contractor is delayed due to acts of omission on
the part of the Contracting Agency in obtaining easements, rights of entry or right of way, the
Contractor will be entitled to an extension of time The Contractor agrees that such delay
shall not be a breach of contract
' Ciry of Bremerton
Wash�ngton Avenue Sewer Improvements
Cont�act Documents
lll-45
236-1896-113 (O7/04)
November 2013
D�v�s�on 1
'
The Contractor shall be responsible for providing, without expense or I�ability to the
Contracting Agency, any additional land and access thereto that the Contractor may desire
for temporary construction facdities, storage of materials, or other Contractor needs
However, before usmg any prwate property, whether ad�oirnng the work or not, the
Contractor shall fde with the Engineer a written permission of the private property owner,
and, upon vacating the premises, a written release from the property owner of each property
disturbed or otherwise interfered with by reasons of construction pu�sued under this
contract The statement shall be signed by the private property owner, or proper authority
acting for the owner of the private property affected, stating that permission has been
granted to use the property and all necessary permits have been obtained or, in the case of
a release, that the restoration of the property has been satisfactorily accomplished The
statement shall include the parcel number, address, and date of signature Written releases
must be filed with the Engmeer before the Completion Date wdl be established
��*:►#:#�
Add the following new section
1-07.28 Potential for Contaminated Soils (NEW SECTION)
General The possibility for encountering contaminated soils along Sheldon Boulevard is
very likely This area is the former Brem-Air Facility which handled and stored gasoline,
hydraulic fluids, and other hydrocarbon liquids All of the facility's underground storage tanks
were removed over 10 years ago, but there is the likelihood of encountering these materials
In the event that contaminated sod is detected, notify the Engineer immediately Removal
and disposal costs will be per Section 2-02 3(9)
Contractor's Responsibdities The Contractor shall be responsible for all matters related to
worker safety and for detection of contaminated soils and/or groundwater encountered
during construction as related to worker safety The Contractor shall ensure the protection of
the safety and health of construction workers and other authorized persons at the work site
from exposure to potentially hazardous substances
1-07.30 Field Office (NEW SECTION)
The Contractor shall establish, maintain, and provide power and mternet serv�ce for the
duration of the Contract and a field office for the Engineer's use at the designated stagmg
area The office shall provide a minimum 400 square feet and an 8-foot ceilmg height for the
exclusive use of the Engineer and the Engineer's staff The sanitary facilities shall be
integral or ad�acent The same sarntary facilities available to the Contractor shall be
avadable to the Engineer _
The field office shall be a weather-tight building, either portable or permanent structure a
minimum of ten (10) feet wide, having at least one door Wmdows shall open to allow
ventilation Doors and windows shall be provided with screens The Engineer's space shall
have at least one window having a mirnmum area of 8 square feet The interior walls shall
be covered with material suitable for displaying contract plans and progress charts, etc
C�ry of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
lll-46
236-1896-113 (01/04) �
November 2013
Div�sion 1
'
'
'
'
'
L I
'
�
'
'
'
1
'
'
�
'
�
LJ
The field office shall be level and, if portable, adequately supported on blocks The
Contractor shall provide a locking device and shall provide to the Engineer a mirnmum of
three (3) sets of keys If more than three (3) steps are required to enter the office, a landing
of at least 12 square feet with rading shall be provided Steps and landing shall be stable
and slip resistant Two parking spaces minimum designated for the use of the Engineer and
the Engineer's staff shall be provided in close proximity to the field office
The Contractor shall be responsible for maintaining the field office and repairing any
damage to the structure, equipment, or appurtenances The Contractor shall provide
�anitorial services at least finnce per week Such services shall include the supply of
appropriate paper products and dispensers Trash receptacles shall be provided and
emptied by the Contractor as required The trash shall be removed from the site by the
Contractor
The Engineer's space shall be furrnshed with the following furniture, equipment, and
appurtenances reasonably presentable and acceptable to the Engineering staff
a Conference table, 36 inches by 96 mches (one)
b Office desk chairs, new (four), folding chairs (eight), ad�ustable height stool (one)
c 4-Drawer legal fde steel cabinet (one)
d Office desk 30 inches by 60 inches, new (finro)
e Five (5) shelf bookcase, 15 inches deep by 36 inches wide, (one)
f Pantry storage cabmet with two doors, lockable with two sets of keys, four (shelves),
16 inches deep by 32 inches wide, new (finro) _
g White board 30 inches by 60 inches minimum, new, with eraser and one five (5)
color set of dry erase markers
h Metal trash receptacle (two)
Multifunction copier with print, copy, and scan functions installed and Contractor
provided maintenance within 24 hours of notification of required service by the
Engineer The multifunction copier shall have the following capabdities
Color copying and scanrnng
ii Minimum paper sizes — letter (8-1/2 x 11 m), legal (8-1/2 x 14 in ), and
Ledger (11 x 17 in ) Contractor shall supply and maintain all paper, toner,
and supplies required for operation of the multifunction copier
' C�ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
lll-47
236-1896-113 (Ol/04)
November 2013
Drvrsron 1
�
�
iv
Mirnmum speed for automatic document feeder, printing, copymg, and
scanrnng shall be thirty-five (35) pages per minute
Firnshing with stapling and collating
� H�gh-speed business class internet connection with a minimum connection speed of
15 Mbps, 6 port switch with cables for connecting multifunction copier, each desk,
and one guest connection, wireless router, and five (5) multiport surge protectors
k Refrigerator with freezer, size fifteen (15) cubic feet mmimum, new (one)
I Microwave with stand, size one (1) cubic foot minimum, new (one)
The Engineer's space shall be dluminated at the table and desks An outdoor lightmg fixture
with a 300-watt bulb or approved equal shall be installed to effectively light the area around
the office facdity
Contractor shall provide drmkmg water within the office and sanitary facdities Heating and
air-conditioning of sufficient capacity to control the temperature at all times shall be
provided
The Contractor shall procure all permits and licenses which are necessary and incidental to
the Contractor's operations in the performance of the work and give all notices required by
such permits and licenses
The field office, equipment, and appurtenances supplied by the Contractor shall revert to
and be removed by the Contractor when the Engineer gives Notice of Compietion to the
Contractor
Cost of field office, equipment, and appurtenance list above, mcludmg furnishmg, erection,
permits, subsequent moves if required, and removal shall be included in the bid item for
Mobilization No payment for Mobilization will be made untd the Field OfFce for the Engineer
and the Engineer's staff has been provided and approved
The complete field o�ce and appurtenances shall be m place prior to the start of any other
on-site work under the contract
C�ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
111-48
236-1896-113 (Ol/04) �
Novemtrer 2013
D�ws�on 1
'
�
,
1-08 PROSECUTION AND PROGRESS
�J
�
�
'
,
�
—
�
'
'
,
i
,
,
'
,
�:.****�
Add the following new section
1-08.0 Preliminary Matters (NEW SECTION)
(May 25, 2006 APWA GSP)
�.*****�
Add the followmg new Subsections 1-08 0(1), 1-08 0(2), 1-08 0(3), 1-08 0(4), and 1-08 0(5)
1-08 0(1) Preconstruction Conference (NEW SECTION)
(October 10, 2008 APWA GSP)
Pnor to the Contractor beginning the work, a preconstruction conference will be held
between the Contractor, the Engineer, and such other interested parties as may be invited
The purpose of the preconstruction conference will be
• To review the initial progress schedule,
• To establish a working understanding among the various parties associated or
affected by the work,
• To establish and review procedures for progress payment, notifications, approvals,
submittals, etc ,
To establish normal working hours for the work,
Establish regular date, time, and place for weekly construction meetings,
• To review safety standards and traffic control, and
• To discuss such other related items as may be pertinent to the work
The Contractor shall prepare and submit at the preconstruction conference the following
• An initial progress schedule,
• Pre-construction submittals (see 1-05 5(7)A)
• A breakdown of all lump sum items,
• A list of matenal sources for approval if applicable
�**�***�
1-08.0(2) Hours of Work (NEW SECTION)
Except in the case of emergency or unless otherwise approved in writing by the Contracting
Agency, the normal straight time working hours for the Contract shal! be any consecutive
8-hour period between 7 00 a m and 5 00 p m of a working day with a maximum 1-hour
lunch break and a 5-day work week Alternatively, the contractor may work a 10-hour work
day and a 4-day work week
' Ciry of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documents
lll-49
236-1896-113(O1/04)
November 2013
D�ws�on 1
0
1
The normal straight time working period, including dady start and ending times, shall be
established at the preconstruction conference or prior to the Contractor commencing the
work The City shall be notified in writing if the Contractor modifies the schedule at any time
during construction
Wntten permission from the Engineer is required, if a Contractor desires to perform work on
holidays, Saturdays, or Sundays, before 7 00 a m or after 7 00 p m on any day, or longer
than the scheduled work day The Contractor shall apply m writ�ng to the Eng�neer for such
permission, no later than noon on the working day prior to the day for wh�ch the Contractor
is requesting permission to work
Permission to work Saturdays, Sundays, holidays, or other than the agreed upon norma{
straight time working hours Monday through Friday may be given sub�ect ,to certain other
conditions set forth by the Contracting Agency or Engineer These conditions may include
but are not limited to �>
The Engmeer may require designated representatives to be present durmg the work
Representatives who may be deemed necessary by the Engineer mclude, but are not limited
to survey crews, personnel from the Contracting Agency's material testing lab, inspectors,
and other Contractmg Agency employees when m the opinion of the Engineer, such work
necessitates their presence For these necessary personnel, the Owner reserves the right to
require reimbursement of salaries by the Contractor for work during non-standard work
hours In such cases, the Contracting Agency may deduct from amounts due or to become
due to the Contractor for the costs in excess of the straight-t�me costs for employees of the
Contracting Agency required to work overtime hours
�#.*.*��
1-08.0(3) Weekly Construction �Aeetmgs (NEIAI SECTION)
Weekly meetings shall be held at a mutually agreed-upon location and day of the week and
time The purpose of the meeting will be to discuss the work, resolve any quantity or force
account disagreements, review the Contractor's Progress and Schedule, and review the
record drawmgs The Contracting Agency shall develop an agenda for each weekly meeting
The Contractor shall provide an updated 2-week look-ahead schedule for each meeting
�:�.*�.*�
1-08.0(4) Other Meetings (NEW SECTION)
Durmg the course of the pro�ect, it will be necessary to schedule additional meetings that the
Contractor shall attend to either review and discuss specif�c issues on topic that may be too
involved for inclusion m the weekly progress meeting or require involvement form others not
directly associated with the pro�ect When a special meeting is required, the Engineer wdl
coordinate time and place for all required attendees Special meeting topics may include
• Work sequence
• Coordination for bypassing and connection work
C�ry of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
lll-50
236-1896-113 (01/04) �
November 2013
Divis�on 1
'
'
'
'
'
�*:****�
1-08.0(5) Construction Constraints and Work Sequence (NEW SECTION)
The Owner requires specific construction constraints and work sequence to maintain water
and sewer service, as well as public access during the work Additional sequence
constraints are described in Section 1-07 23 These constramts and work sequence
elements are as follows
• No excavation shall occur within the property boundaries of Evergreen Park per the
1 Ecology Agreed Order, except for mmor excavation associated with construction of
the Sheldon Boulevard curb and gutter
' v New water main along Washington Avenue shall be constructed and permanent
service provided to property owners prior to abandonment of existmg water main and
construction of new 4-inch sewer main along Washington Avenue
' • Construction within the Washington Narrows beach area for abandonment of existing
sewer laterals shall occur only between mean and low tide periods Access to the
beach shall only be from Evergreen Park
�
• Installation of all isolation valves shall occur prior to abandonment of existmg water
main along Sheldon Boulevard
• Interruption of water and sewer service shall not exceed 4 hours, unless otherwise
' approved by the Owner Contractor shall inform each resident 2 days prior to any
water or sewer service disruption
��
�
�
�
'
• Work on the beach for cutting and capping sewer laterals may not be perFormed
before June 15 The Hydraulic Pro�ect Approval (HPA) will be issued by the WDFW
and will contain spec�fic requirements for how work on the beach may occur, such as
requiring trenches to be backfdled dady and no work may occur in-water
• Public access to Evergreen Park and the 9/11 Memorial shall be maintained at ;all
times, as noted on the Traffic Control Plans Specific allowable closure durations for
the 14th Street park entrance are given m Section 1-07 23
Construction completion dates for the finro phases of work shall be per Section 1-04 12
Phased Substantial Completion
, 1-08.3 Progress Schedule
�***�**�
' Section 1-08 3 is supplemented with the following
The Contractor shall submit a construction schedule to the Owner within 10 calendar days of
' award of contact The Owner will have the right to review the schedule, and must approve
the schedule prior to issuing Notice to Proceed
'
'
The monthly schedule updates shall clearly identify the critical path items of the work
' C�ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Conuact Documents
lll-51
236-1896-113(O1/04)
November 2013
D�v�sion 1
l��
1-08.3(1) General Requirements
�**.**.�
Section 1-08 3(1) is supplemented with the following
The Contractor shall submit a Type B Schedule
The schedule shall be prepared electronically using Microsoft Pro�ect 2003 (or later),
Oracle/Primavera scheduling software, or scheduling software acceptable to the Owner
�#.***.�
Section 1-08 3(2) is supplemented with the following
The Contractor shall provide a monthly update to the Type B Schedule, to be submitted at
the first weekly meeting of the month Payment shall be withheld until the updated schedule
has been submitted and approved by the Owner
1-08.4 Prosecution of Work
Delete Section 1-08 4, in its entirety, and replace it with the following
1-08 4 Notice to Proceed and Prosecution of Work
(June 27, 2011 APWA GSP)
Notice to Proceed wdl be given after the contract has been executed and the contract bond
and evidence of insurance have been approved and fded by the Contracting Agency The
Contractor shall not commence with the work untd the Notice to Proceed has been given by
the Engineer The Contractor shall commence construction activities on the pro�ect site
within ten days of the Notice to Proceed Date, unless otherwise approved in writmg The
Contractor shall ddigently pursue the work to the physical completion date within the time
specified m the contract Voluntary shutdown or slowing of operations by the Contractor
shall not relieve the Contractor of the responsibility to complete the work within the time(s)
specified in the contract
When shown in the Plans, the first order of work shall be the installation of high visibility
fencing to delineate all areas for protection or restoration, as described in the Contract
Installation of high visibdity fencing ad�acent to the roadway shall occur after the placement
of all necessary signs and traffic control devices m accordance with 1-101(2) Upon
construction of the fencing, the Contractor shall request the Engineer to inspect the fence
No other work shall be performed on the site untd the Contracting Agency has accepted the
installation of high visibdity fencing, as described in the Contract
1-08.5 Time of Completion
�...««.�
Replace Section 1-08 5 with the following
The Contractor shall mobilize equipment and construction trader at the site and begin work
withm ten (10) calendar days of the Notice to Proceed date The Work shall obtain
Substantial Completion within the times designated in "Article 2" of the CONTRACT
C�ty of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer lmprovements 111-52 November 2013
ConVact Documents D�ws�on 1
'
��i
'
Time lost in replacing improper work or material shall not furnish any grounds to the
Contractor for claiming an extension of time for the completion of the work and shall not
release the Contractor from damages or liabilities for fadure to complete the work within the
time stipulated
' 1-08 6 Suspension of Work
,I �
,
�*»**..�
Section 1-08 6 is supplemented with the following
The Engineer may order suspension of all or any part of the work if unsuitable weather,
private utility relocation efforts by others, and other such conditions beyond the control of the
Contractor prevent satisfactory and timely perFormance of the work
If the work is suspended for these reasons, the period of work stoppage will be counted as
, unworkable days The Engmeer wdl set the number of unworkable days (or parts of days) by
deciding how long the suspension delayed the entire pro�ect
,
'
,
�
,
�
J
�
�'
,
The Contractor shall anticipate utdity work by private utility companies occurring at the same
time as this Contract on the pro�ect site The Contractor shall anticipate coordination with
private utilities and remobdization due to conflicts with private utdity company work No
additional monetary damages wdl be paid to the Contractor for demobdization or
remobilization due to the suspension of work
1-08 7 Maintenance During Suspension
�.*:#**�
Revise the second paragraph of Section 1-08 7 to read
At no expense to the Contractmg Agency, the Contractor shall provide through the
construction area a safe, smooth, and unobstructed roadway, sidewalk, and path for public
use during suspension (as required in Section 1-07 23 or the Special Provisions) This may
include a temporary road or detour
1-08.8 Extensions of Time
�#**.�.�
Section 1-08 8 is supplemented with the following
The Contractor shall consider and make allowances for normal seasonal weather patterns in
the scheduling and sequencmg of the work in order to complete the work by the specified
deadlines The Owner wdl not extend the specified completion dates for reasons of
unfavorable weather unless the Contractor can demonstrate that weather patterns have
been extraordinary and the Contractor has made a good faith effort to limit the amount of
area exposed to the weather at any given time
' C�ry of Bremerton
Washington Avenue Sewer Improvements
Convact Documents
lll-53
236-1896-113 (Ol/04)
November 2013
D�ws►on 1
'
Due to the nature of the pro�ect, the Contractor shall anticipate there will be numerous
unforeseen conflicts with underground utilities The Owner will have representat�ves on site
during working hours to make decisions when a deviation from the design is required The
time required for the Contractor and the Owner to make ad�ustments for unforeseen
conditions shall not be grounds for additional compensation due to delay nor an extension of
the completion deadline The only exceptions to this rule are as follows
1 The Owner has faded to make a decision within 8 working hours when an unforeseen
conflict is discovered on a critical path time of work
2 The unforeseen conflict involves hazardous materials or historical artifacts which
prevent the Contractor for proceeding with critical path elements of the work
1-08.9 Liquidated Damages
�:**..*�
Delete and replace the second and third paragraphs of Section 1-08 9 with the following
Liquidated damages are established per "Article 3" of the Contract The Engineer wdl deduct
the accumulated amount from any money due or coming due to the Contractor
1-09
1-09.1
Measurement of Quantities
�*****.�
Section 1-09 1 is supplemented with the followmg
Bid items that are to be measured by the "Ton" wdl be measured as follows
MEASUREMENT AND PAYMENT
1 Quantities shall be based on certified truck tickets signed by the dnver and collected
by the City's Pro�ect Inspector dady at the time and place of delivery Loads of
material for which a certified weight ticket has not been given to the City's Pro�ect
Inspector shall not be paid for
2 It will be the Contractors responsibility to see that a ticket is given to the City's
Pro�ect Inspector for each truckload of material delivered Tally tickets shall be
prepared to accompany each truckload of material delivered to the pro�ect The
tickets shall bear at least the following information
a -Truck number
b Quantity delivered in cubic yards and tons
c
0
Driver's name and date of delivery
Location of delivery by �ob name and street name
C�ry of Bremerton
Washington Avenue Sewer lmprovements
Contract Documents
lll-54
236-1896-113 (01/04) �
November 2013
D�v�s�on 1
�
i �
,
�
e Place for receipting by the City's Pro�ect Inspector
f Type of material delivered
3 Tickets shall be given to the City's Pro�ect Inspector on a dady basis Tickets will only
' be accepted on the date the material is delivered Tickets wdl not be accepted at a
later date unless prior agreements have been made
' �******�
Add the following new section
'
'
1-09.1(1) Quantity Reporting Requirements (NEW SECTION)
General
Requirement Preparation of dady Quantity Reports generally as described m this Section is
hereby required of both the City and Contractor
' Controlling Record City and Contractor hereby acknowledge that the purpose of such
dady Quantity Reports is to create a valid, contemporaneous record of all bid-item work
performed by the Contractor, with the goal of limitmg disputes by tracking and agreeing on
the various quantities of work as it is performed The dady Quantity Reports required herein
1 shall become the controlling record and source documentation of the work performed and
the materials provided by the Contractor each day
,
'
LJ
,
'
�
'
'
Correction of Errors Nothmg in this Section shall bar later ad�ustment of quantities for the
purpose of correctmg errors or omissions when such ad�ustment is authorized by the
Engineer City and Contractor hereby agree that the Engineer's decision regarding
corrections shall be final, as provided m Standard Specifications Section 1-05 1
Dispute Resolution For the purposes of this Section only, daily Quantity Reports for the
preceding week shall be reviewed by the Contractor and Engineer at each weekly
construction meeting and, to the extent possible, any dispute related to the quantity of work
performed during the preceding week shall be resolved and final bid item quantities agreed
upon
Dailv Quantity Reqort
Report Preparation The Engineer will complete a daily Quantity Report for each day that
work is performed The Contractor shall furrnsh any required material mvoices or load
receipts to the Engineer each day in time for completion of the day's report The Engmeer
and Contractor shall review each day's report not later than the end of the next business
day Both the Engineer and Contractor shall sign/initial each day's Quantity Report,
acknowledging the quantities of work and materials indicated in the Report The City uses
an approved-equivalent of WSDOT Form #422-635, titled Field Note Record for dady
quantity reports A sample form is included in the appendices
' City of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
lll-55
236-1896-113 (01/04)
November 2013
Diws�on 1
'
1-09 6 Force Account
�...**#�
Section 1-09 6 is supplemented with the following
Bid Item #1, "Mmor Changes and Force Account", has been included in the Bid Proposal for
the following changes resulting in extra work
• As directed by the Owner in accordance with Section 1-04 4 These changes are
issued via written Work Change Directives (WCDs)
• Due to differing site conditions, as described in Section 1-04 7, for which the
Engineer determines the Contractor is due additional compensation per
Section 1-04 7 and which is not covered by the contract urnt prices
Payment from this bid item is only permitted by wr�tten approval from the Engineer in
accordance with Sections 1-04 4 and 1-09 6
�.*.***�
Add the following new section
1-09.6(1) Force Account Reporting Requirements (NEW SECTION)
General
Requirement Preparation of dady reports generally as described m this Section, of all
Force Account Work authorized by the City, is hereby required of both the City and
Contractor
Controlling Record City and Contractor hereby acknowledge that the purpose of such
dady reports is to create a valid, contemporaneous record of all work performed by the
Contractor in response to Work Change Directives (WCD) issued by the City, with the goal
of limiting disputes by agreemg on the amounts and costs of work as the work is performed
The daily reports required herein shall become the controlling record and source
documentation of the work actually performed, and the materials actually provided, by the
Contractor for Force Account Work
Error Correctoon Nothing in this Section shall bar later ad�ustment of quantities or costs for
the purpose of correcting errors or omissions when such ad�ustment is authorized by the
Engineer City and Contractor hereby agree that the Engineer's decision regarding
corrections shall be final, as provided in Standard Specifications Section 1-05 1
Dispute Resolution For the purposes of this Section only, Dady Force Account Reports for
the preceding week shall be reviewed by the Contractor and Engineer at each weekly
Construction Meetmg and, to the extent possible, any dispute related to the quantity of
Force Account work performed during the preceding week shall be resolved and fmal
material quantities, labor hours and equipment hours agreed upon
C�ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
111-56
236-1896-113 (Ol/04) �
November 2013
D�v�sion 1
'
�
'
,
�
�
'
Daily Force Account Report
Report Preparation The Engineer will complete a daily Force Account report for each unit
of Force Account work, for each day that such work is performed The Contractor shall
furnish the material and equipment invoices required by Standard Specification Section 1-
09 6 to the Engineer each day in time for completion of that day's reports The Engineer and
Contractor shall review each day's reports not later than the end of the next business day
Both the Engineer and Contractor shall sign each day's Force Account reports,
acknowledging the quantities of materials and hours of use of labor and equipment indicated
in the report The City uses a form equivalent to WSDOT Form #422-008 titled `Dady Report
of Force Account Worked' for trackmg force account work A sample of the City-prov�ded
form that will be used for all such reports is included in the appendices
1-09 8 Payment for Material on Hand
, ��***.*�
Delete all the provisions of Section 1-09 8 and substitute with the following
� For lump sum pay items, the Owner will pay 75% of the actual invoice value for materials on
hand with an invoice value over $5,000 Unit price bid items wdl not be reimbursed when on
hand
�
�
C �
�
�
1-09 9 Payments
(March 13, 2012 APWA GSP)
Delete the first four paragraphs and replace them with the following
The basis of payment wdl be the actual quantities of Work perFormed accordmg to the
Contract and as specified for payment
The Contractor shall submit a breakdown of the cost of lump sum bid items at the
Preconstruction Conference, to enable the Pro�ect Engineer to determme the Work
performed on a monthly basis A breakdown is not required for lump sum items that mclude
a basis for incremental payments as part of the respective Specification Absent a lump sum
breakdown, the Pro�ect Engineer wdl make a determination based on mformation available
The Pro�ect Engineer's determination of the cost of work shall be final Lump sum item
breakdowns are not required when the bid price for the lump sum item is less than $20,000
Progress payments for completed work and material on hand will be based upon progress
, estimates prepared by the Engineer A progress estimate cutoff date will be established at
the preconstruction conference
LJ
'
'
The initial progress estimate wdl be made not later than 30 days after the Contractor
commences the work, and successive progress estimates wdl be made every month
thereafter untd the Completion Date Progress estimates made during progress of the work
are tentative, and made only for the purpose of determming progress payments The progress
estimates are sub�ect to change at any time prior to the calculation of the final payment
' C�ty of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
lll-57
236-1896-113 (Ol/04)
November 2013
D�v�s�on 1
,
The value of the progress estimate will be the sum of the following
• Unit Price Items m the Bid Form — the approximate quantity of acceptable units of
work completed multiplied by the unit pnce
• Lump Sum Items in the Bid Form — based on the approved Contractor's lump sum
breakdown for that item, or absent such a breakdown, based on the Engineer's
determination -
• Materials on Hand — 75 percent of invoiced cost of material delivered to �ob site in
accordance with 1-09 8
• Executed and completed Work Change Directives, to be paid under bid item for
"Minor Changes and Force Account " -
� Change Orders — Entitlement for approved extra cost or completed extra work as
determined by the Engineer Change Orders will be used only after the bid item
"Minor Changes and Force Account" has been exhausted and is required Change
orders require approval by the Mayor and/or City Council
Progress payments will be made m accordance with the progress estimate less
• Retamage per Section 1-09 9(1), on non FHWA-funded pro�ects,
• The amount of progress payments previously made, and
• Funds withheld by the Contracting Agency for disbursement in accordance with the
Contract Documents
Progress payments for work performed shall not be evidence of acceptable performance or an
admission by the Contracting Agency that any work has been satisfactorily completed The
determination of payments under the contract wdl be final in accordance with Sect�on 1-05 1
1-09 17
1-09 11(3)
Disputes and Claims
Time Lemitatson and Juresdection
�*..***�
Replace all references to Thurston County with Kitsap County
1-09.13 Claims Resolution
1-09.13(3) Claims $250,000 or less
��#*:�:*�
Delete this section, including subsection A
C�ty of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documents
III-58
236-1896-113(O1/04) �
November 2013
D�v�sion 1
,
'
'
'
1-09 13(3)B Procedures to Pursue Arbitration
�*:.:*.�
Replace Section 1-09 13(3)B with the followmg
' The Contractor and the Contracting Agency mutually agree that claims, whatever the value,
submitted in accordance with Section 1-09 11 and not resolved by nonbmding arbitration
ADR processes, shall be resolved by litigation unless the parties mutually agree to resolve
' the claim through binding arbitration Each party is responsible for its own attorney fees and
litigation costs
, 1-10
1-10.1
,
�
TEMPORARY TRAFFIC CONTROL
General
�**.***�
Section 1-10 1 is supplemented with the following
Pro�ect specific traffic control requirements are mcluded in Section 1-07 23(1)
All traffic signs, barricades, and devices shall conform to Section 1-07 23 of the Standard
' Specifications The Contractor shall be responsible for directing and controlling pedestrian
and vehicular traffic, including all approved temporary re-routing at all times durmg
construction activity
--,
�.
'
The Contractor, at his expense, shall be required to maintain sufficient warning signs and
adequate barricades at all open excavation to warn mowng vehicles and pedestnans This
shall include not only open excavation, but also recently filled and/or paved areas which
have not yet been fully compacted and rolled to return the surFace to a state required to
withstand normal use
' All necessary flagmen, barricades, and directional signs shall be furrnshed and maintained
by the Contractor at all times and also if the work is suspended during the construction
period The Contractor shall provide such additional barricades and protective devices as
' will be required to reasonably protect workmen and others, as well as arnmals, from m�ury
resultmg from excavation and other site work during the construction period
,
'
�
Upon fadure of the Contractor to provide immediately and maintain adequate suitable
barricades, lights, and detour signs when ordered to do so, the Capital Engineer shall be at
the liberty, without further notice to the Contractor or the surety, to provide the same and to
deduct the costs thereto from any monies or payment due or to become due to Contractor,
and the Engmeer assumes no liability connected therewith
Emergency traffic such as police, fire, and disaster units, shall be provided access at all
times The Contractor shall be liable for any damages, which may result from fadure to
provide reasonable access or coordmation
' Required Notification of Businesses and Residents The Contractor shall notify all affected
businesses and residents by door hanger or other simdar method approved by the Engineer
at least one calendar week in advance of construction activities ad�acent to their business or
' City of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer Improvements lll-59 November 2013
Contract Documents Div�s�on 1
'
home Additionally, the Contractor shall notify all affected businesses and residents at least
48 hours and not more than 72 hours in advance of construction activities that would block
or restrict access to their businesses or homes Blockage shall occur only during working
hours and shall be removed during non-working hours
Existing Signs, Devices, and Pavement Markings Existing traffic control and street name
signs which interFere with construction shall be relocated, covered, or removed by the
Contractor and temporarily stored m a safe place "Stop", "Yield', and "One-Way" signs shall
be removed, covered or relocated only upon approval of the Engmeer Existing signs shall
not be removed until the Contractor has provided temporary measures sufficient to
safeguard and direct traffic after the existmg signs have been removed Except as otherwise
specifically provided m the contract documents, preservation and mamtenance of traffic
control and street name signs shall be the sole responsibility of the Contractor
As work progresses and as permits, temporardy relocated or removed traffic and street name
signs shall be reset in their permanent location by the Contractor Signs and other traffic control
devices damaged or lost by the Contractor, shall be replaced or repaired by the Contractor at
no cost to the City The option of whether a sign can be repaired or shall be replaced shall be
the Engineer's, and such decision shall be final and bmdmg on the Contractor
When paint lines are obliterated due to construction activities or pavement restoration,
temporary pressure sensitive pavement markmg tape, traffic buttons or delineators shall be
installed where designated by the Engineer These temporary features shall be removed only
upon installation of permanent traffic channel�zation Unless otherwise prowded for by a
separate bid item in the proposal, removal of permanent stripmg and installation and removal of
temporary stripmg shall be madental to the un�t contract price for other items m the proposal
Mamtaming Two-way Traffic and Access Except as authorized by the Engmeer, finro-way traffic
shall be maintamed at all times No dead-end streets wdl be allowed to have less than one way
access at any time During normal working hours, the Contractor shall mamtain, in a safe,
acceptable cond�tion, all approaches and intersections with roads, streets, alleys, and
driveways to businesses, parkmg lots, residences, etc All streets shall be open to local traffic at
the end of each working day unless otherwise noted in the approved Traffic Control Plans
Except where permitted elsewhere in the Contract Documents or authorized by the Engineer
in writmg, during non-working hours, excavations within roadways, driveways, pedestrian
pathways, or similar areas within rights of way or easements used by the public shall be
backfilled, compacted and covered with cold mix asphalt or covered with steel plates or
other approved temporary bridging
The Contractor shall conduct the work so as to obstruct and mconvenience traffic as little as
possible The Contractor shall not open sections of the work and leave them in an
unfinished condition Dunng normal workmg hours, the Contractor shall maintain, in a safe,
acceptable condition, all approaches and intersections with roads, streets, alleys, and
driveways to businesses, parking lots, residences, etc All streets shall be open to local
traffic at the end of each working day unless otherwise noted in the approved Traffic Control
Plans During non-working hours, the Contractor shall keep existing traffic lanes clear,
without interference from construction operations, equipment or matenals
Crty of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
lll-60
236-1896-113 (O7/04) �
November 2013
Div►s�on 1
�
'
�
1-10.2
' 1-1 0.2(1)
Traffic Control Management
General
�*..**:�
' Section 1-10 2(1) is supplemented with the following
The Traffic Control Supervisor (TCS) shall be on-site while work or unloadmg/loading is
' occurring on City streets The TCS shall be responsible for placement, maintenance,
correctness and adequacy of the contractor's temporary traffic control
The TCS wdl be contacted to correct any traffic control or signing deficiencies during normal
, working hours or during evernngs or weekends as necessary or required The TCS shall
respond as required by Standard Specification 1-10 2(1)B If the TCS or the Contractor's
forces do not respond within the required time, the City will make any necessary corrections
' using its own or other forces and shall deduct the entire cost of all such work from sums
due, or to become due, to the Contractor All such charges against the Contractor's
payments shall be made at the City's then current rates for labor, equipment, and materials
'
�
'
�
L__I
�
�
The TCS shall be certified by one of the foNowing organ�zations or an equivalent approved
entity by the Owner American Traffic Safety Services Association (ATSSA), Evergreen
Safety Council, Northwest Laborer-Employers Trammg Trust The TCS certification shall be
submitted to the City prior to any construction
1-10.2(2j Traffic Control Plans
�.*...*�
Section 1-10 2(2) is supplemented with the following
The Contractor shall be responsible for developing an approved Traffic Control Plan
consistent with MUTCD and the pro�ect Contract Documents The Traffic Control Plan may
consist of approved WSDOT K-Plans where applicable
Payment for developmg an approved Traffic Control Plan shall be considered incidental to
the lump sum price in the Proposal for "Pro�ect Temporary Traffic Control" and no additional
compensation will be made
1-10.3
1-10.3(3)
Traffic Control Labor, Procedures and Devices
Traffic Control Devices
�.*�*.*�
' Section 1-10 3(3) is supplemented wrth the following
Signs, barricades, lights, and other warning devices shall be installed on or ad�acent to the
, roadway per the requirements of the Manual on Uniform Traffic Control Devices for Streets
and Highways and shall be maintained 24 hours a day until the roadway work is completed
and ready for traffic The Contractor shall not begin any work on or ad�acent to the roadway
, at any time until all signs and other traffic control devices are in place and operating as
outlined in the Standard Specifications, Special Provisions, and approved Traffic Control
' C�ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
lll-61
236-1896-113 (01/04)
November 2013
Diws�on 1
L�
�
P1an The Contractor shall maintain the work area to ensure that all traffic signs and other
tra�c control devices are properly placed and in effect The Contractor shall replace, without
delay, signs and traffic control devices that are misplaced, mutdated, or destroyed All signs
and traffic control devices, which become soiled such that their effectiveness is diminished
as determined by the Engmeer or the Inspector, shall be replaced or cleaned by the
Contractor without delay Traffic control devices intended for use during the hours of
darkness shall be equipped with flashing lights (i e barricades) or reflective tape
(i e cones/barrels) or as determined by the Eng�neer The Contractor shall provide all
construction signs and safety equipment required
The Contractor, at his expense, shall be required to maintain sufFcient warning lights and
adequate barricades on all trenches and open excavation to protect moving traffic and
pedestrians This shall include not only open trenches, but also recently closed trenches that
have not been returned to full and safe operating surface for normal use
All necessary state-certrf�ed flagmen, barricades, and detour signs shall be furnished and
supplied/installed by the Contractor, both during working hours and also when the work is
suspended during the construction period The Contractor shall provide such additional
barncades and protective devices as will be required to reasonably protect the workmen,
vehicles, bicyclists, pedestrians, and animals from excavated areas durmg the construction
period
Upon fadure of the Contractor to immediately provide and maintam adequate suitabfe
barricades, lights, and detour signs when ordered to do so, the City shall be at liberty,
without further notice to the Contractor or the surety, to provide the same and deduct the
cost thereof from monies or payments due or to become due the Contractor, and the City
assumes no liabdity connected therewith
The Contractor shall be responsible for proper notification to, and coordination with, all
school districts, fire departments, waste management, local postal service, and all other
persons and services which will be affected by this pro�ect It shall be the Contractor's
responsibility to keep the school district and fire departments and others fully advised of his
construction progress and also the time of completion of the pro�ect Street rights-of-way
that are restricted will require special care in construction to mamtain finro-way traffic flow
The Contractor shall mamtain safe and adequate pedestrian access along the street during
the construction of the pro�ect The Contractor shall make every attempt to provide access to
the ad�acent properties and to mmimize dust nuisances
1-10.3(3)A Construction Signs
�.*#.**�
Section 1-10 3(3)A is revised to read as follows
All signs required by the approved traffic control plan(s) as well as any other appropriate
signs prescnbed by the Engineer shall be furrnshed, maintained, and operated by the
Contractor The Contractor shall provide the posts or supports and erect and mamtain the
signs in a clean, neat, and presentable condition until the necessity for them has ceased All
non-applicable signs shall be removed or completely covered with metal, plywood, or an
Engmeer approved product specifically manufactured for sign covenng during penods when
they are not m effect When the need for these signs has ceased, the Contractor, upon
C�ry of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documents
11/-62
'
'
'
'
��
�
�
'
e
�
�
L�
�
�
,
�
236-1896-113 (01/04) �
November 2013
D�vis�on 1
'
'
'
C�
'
'
'
,
approval of the Engineer, shall remove all signs, posts, and supports from the pro�ect and
they shall remam the property of the Contractor
All orange background
Section 9-28 All oran
orange sign sheeting
signs shall utilize materials, and be fabncated in accordance with,
�e background signs shall be fabricated with Type X fluorescent
All post mounted signs with Type X sheeting shall use a nylon washer befin+een the finnst
fasteners (screw heads, bolts, or nuts) and the reflective sheeting
There shall be no mtermixing of signs with non-fluorescent orange reflective sign sheeting
and signs with fluorescent orange reflective sign sheeting on the same signpost
If it is necessary to add weight to signs for stabdity, only a bag of sand that will rupture on
impact shall be used The bag of sand shall (1) be furnished by the Contractor, (2) have a
maximum weight of 40 pounds, and (3) be suspended no more than 1 foot from the ground
Signs, posts, or supports that are lost, stolen, damaged, destroyed, or which the Engmeer
' deems to be unacceptable while their use is required on the pro�ect, shall be replaced by the
Contractor without additional compensat�on
'
r
I_ J
'
�
'
'
'
�I
�****.:�
Add the following new sections
1-10.3(3)L Parking Restriction Signs (NEW SECTION)
Where, in the opinion of the Engineer, parking is a hazard to thru-tra�c, or to the
construction work, parking may be restricted either entirely or durmg the time when it creates
a hazard Signs for restricting parkmg shall be approved by the Engineer and provided and
placed by the Contractor The Contractor shall be responsible for and shall maintain the
signs, �f they are used m any street that is directly involved in the construction work� If
parking signs are used beyond the confines of the work area, such as in another street
being used as a detour, the signs will be the responsibdity of the Contractor The placement
of signs restricting parking shall be as approved by the Engmeer Parking restriction signs
shall be placed two working days in advance of needing the parking removed, w�th the start
date of the "no parking" clearly shown The area to be restricted shall be clearly marked with
Type I barricades carrying signs that give the specific period (dates and times) that the area
is to be clear of vehicles Signs shall be large enough to be easily read from a distance of 50
feet and shall advise where �mpounded vehicles will be stored or indicate a 24 hour
telephone number for obtairnng that information A minimum of 72 hours advance notice is
required before towing vehicles All signs must be approved by the Engineer prior to use
Example wording of the signs is as follows
WARNING� TOW AWAY ZONE
NO PARKING
FROM DATE and TIME
TO DATE and TIME
FOR CONSTRUCTION WORK
ALL VEHICLES REMAINING WILL BE TOWED
, C�ty of Bremerion
Washmgton Avenue Sewer Improvements
Contract Documents
111-63
236-1896-113 (01/04)
November 2013
D�vision 1
'
1-10 3(3)M Special Signs (NEW SECTION)
Fabricate and install the following signs on barricades or posts where directed by the
Owner Submit sign template to the City for reviewlapproval before sign fabrication
• Four (4) at 48" x 36" —"Businesses Open During Construction"
• Three (3) at 48" x 36" —"Park Access Closed — Use Pacific Ave NE"
• Three (3) at 48" x 36" — Park Access Closed — Use 14th St
1-10-4
1-10 4(3)
Measurement
Reinstating Unit Items with Lump Sum Traffic Control
�.**#**�
Section 1-10 4(3) is supplemented with the following
The bid proposal contams the item "Pro�ect Temporary Traffic Control", lump sum and the
additional temporary traffic control items listed below The provisions of Section 1-10 4(1),
Section 1-10 4(3), and Section 1-10 5(3) shall apply
No measurement wdl be made for set-up of construction signs Class A or Class B, traffic
control supervisor, traffic control vehicle, or for any other additional work or materials not
listed in the Proposal associated with providing temporary traffic control
No specific urnt of ineasurement will apply to the lump sum item of "Pro�ect Temporary
Traffic Control"
Measurement shall also include all signage, devices, personnel, and other traffic control
measures necessary to comply with the requirements of Sections 1-07 23(1) and 1-07 23(2)
of these Special Provisions
1-10.5 Payment
�******�
Section 1-10 5 is supplemented with the following
Payment for "Pro�ect Temporary Tra�c Control" shall be per Section 1-10 5 of the Standard
Specificat�ons, except that the cost of aA labor, equipment, and materials required to
provide, install, maintam, and remove Class A and B construction signs shall also be
included m the bid item "Pro�ect Temporary Traffic Control"
All costs necessary or incidental to provide signage, devices, personnel, and other traffic
control measures necessary to comply with the requirements of Sections 1-07 23(1) and
1-07 23(2) of these Special Provisions shall also be included in the lump sum pay item for
"Pro�ect Temporary Traffic Control"
END OF DIVISION 1
C�ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
lll-64
236-1896-113 (01/04) �
November 2073
D�v�s�on 1
i�
�
�
'
'
DIVISION 2
EARTHWORK
2-01
2-01.1
CLEARING, GRUBBING AND ROADSIDE CLEANUP
Descript�on
' �:.***.�
Section 2-01 1 is supplemented with the following
� Clearing and grubbmg shall include the removal and disposal of all vegetation and fencing
as required to complete work within the pro�ect area where noted on the Plans
, Miscellaneous small items requiring removal have not been shown on the Plans
2-01.2(1) Disposal Method No. 1— Open Burning
, �**.::.�
Replace Section 2-01 2(1) with the following
' The open burning of residue resulting from land clearing wdl not be allowed
2-01 2(2) D�sposal Method No. 2— Waste Site
' �**.**.�
Replace Section 2-01 2(2) with the following
' Debris shall be hauled to a waste site obtained and provided by the Contractor° in
accordance with Section 2-03 3(7)C All fees for hauling and disposal shall be paid by the
Contractor
�
�
'
2-01.2(3) Disposal Method No. 3— Chipping
�***#**�
Section 2-01 2(3) is deleted Disposal for this pro�ect shall be by Disposal Method No 2—
Waste Site only
2-01.3 Construction Requirements
2-01.3(4) Roadside Cleanup
' �******�
Replace Section 2-01 3(4) and its title with the following
'
2-01 3(4) Cleanup and Restoration
From time to time throughout the progress of the work, the Contractor, when directed by the
, Owner's Representatwe, shall cleanup and remove all refuse and unwanted or unused matenals
resulting from the work, at the Contractor's expense If the Contractor fads to do so w�thin
' Ciry of Bremerton 236-1896-113 (01/04)
Washmgton Avenue Sewer Improvements lll-65 November 2013
Contract Documents D�v�s�on 2
t
�
24 hours after the request by the Owner's Representative, the work may be done by the City and
the cost thereof be charged to the Contractor and deducted from his final estimate
All cleanup shall be performed as specified in the various sections of these Specifications
Final cleanup shall be in accordance with Section 1-04 11
�.**.*.�
Add the following new section
2-01.3(5) Tree Protection (NEW SECTION)
All existing trees within the pro�ect shall be retained and protected durmg construction
unless otherwise noted on the plans ��
Tree protection shall be the responsibility of the Contractor
All excavation or grading within protected root zone shall be done by harid or with small
equipment to mirnmize root damage Any roots less than four inches in diameter exposed by
the construction operation shall be pruned flush with the sod Any roots greater than four
mches in diameter exposed by the construction operation shall be protected untd the root
areas are backfilled if the construction operation causes irreparable damage to the tree or
its roots, the Contractor shall be responsible for all work and materials required to correct
the problem, as directed by Kitsap County's Urban Forester, at no cost to the City
Backfdl root areas with good quality top sod as soon as possible If exposed root areas are
not backfilled within two days, cover them with organic material m a manner which reduces
soil temperature and mmimizes water loss due to evaporation
2-01.4 Measurement
�«*.***�
Section 2-01 4 is replaced with the following
No separate measurement for payment wdl be made for clearing and grubbing, but instead
clearmg and grubbing wdl be included in the lump sum bid item for "Removal of Structures
and Obstructions" ,
No separate measurement for payment will be made for roadside cleanup or routme
clearnng, but instead roadside cleanup or routine cleanmg will be included in the lump sum
price for "Removal of Structures and Obstructions"
2-02
2-02.1
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Description
�******�
Section 2-02 1 is supplemented with the following
This work shall consist of all work defined under clearing and grubbing, and removing all
materials noted in this section of the Special Provisions as well as any other materials not
Crty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements lll-66 November 2013
Contract Documents Div�s�on 2
,
'
'
�
,
'
noted and necessary for the construction of this pro�ect The following items shall be
mcluded under "Removal of Structures and Obstructions"
1 Clearing and grubbing as necessary for all pro�ect improvements
2 Removal and salvaging of split rail fence in Evergreen Park
3 Removal and restoration of fences and rockeries disturbed by construction, or as
specified in the Plans
4 Tree stump/root removal and disposal
In general, the Contractor shall remove/dispose, remove/restore, or abandon existmg items
that are in conflict with the new improvements, as noted above, and or shown on the plans
� Voids left by the removal of items listed above shall be filled with select native borrow or
gravel borrow, and compacted to 95 percent of maximum density as specified in
Section 2-03 3(14)D
�
I
Specific items and materials removed by the Contractor shall remain the property of the City
These items are identified on the Plans or within these Special Provisions and shall be
delivered to the City's maintenance yard All other materials removed shall become the
property of the Contractor and shall be disposed of off-site at a legal disposal site to be
obtained and paid for by the Contractor
' 2-02.3 Construction Requirements
IJ
l_ J
�'
,
'
,
'
�*�.***�
Section 2-02 3 is supplemented with the following
All matenal removed for the construction of the pro�ect shall be hauled off-site to a legal
disposal site by the Contractor The Contractor shall determine the requirements of his
selected disposal site related to accepting the material to be deposited on the site Testing
of the material by the disposal site or refusal of the site to accept the material shall not be
the basis for additional payment or for an extension of the contract time The cost of all such
requirements shall be included in the various bid prices in the Proposal
2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters
�*�**.*�
Section 2-02 3(3) is supplemented with the following
Saw cutting of existing asphalt or Portland cement concrete or Portland cement concrete
pavement shall occur prior to the removal of the existing paved surface to ensure even
edges along the trench To expedite construction, the Contractor may break pavement with
a backhoe, �ack hammer, or similar piece of equipment provided the width is less than the
final paving limits Removal of pavement in this manner is for the Contractor's convenience
and is considered incidental to removal
' C�ty of Bremerton
Washington Avenue Sewer Improvements
ConVact Documents
lll-67
236-1896-113 (Ol/04)
Novembe� 2013
D�v�sion 2
'
�
Before the pavement restoration, the Contractor shall perform a final (second) saw cut Any
pavement that is damaged by breaking the concrete shall be removed by saw cutting and
replacing the damaged portions Where sidewalk abutting buddings is shown to be removed,
it shall be saw cut 18 inches from the face of the budding, and the new concrete sidewalk
shall be placed against the remaming concrete unless directed othervvise by the Engineer
Asphalt pavement shall be removed to a width of 12 inches greater than the top of the
trench unless otherwise noted on the Contract Plans The asphalt shall be saw cut on a
straight Ime to a tolerance of 0 5 inch in 10 feet, with a vertical cut
When Portland cement concrete or Portland cement concrete pavement is to be removed, it
shall be removed to a width of 12 inches greater than the top of the trench or to the next
panel �oint as mdicated on the Plans or as directed by the Engineer When the concrete is
sawn, it shall be on a straight line to a tolerance of 0 5 inch in 10 feet and shall be beveled
so that the cut wdl be approximately 1 inch wider at the top than at the bottom Where the
remaming concrete panel is undermmed due to material on the trench wall slumping into the
trench, notify the Engmeer so that the final saw-cut line can be ad�usted appropnately
After removal of pavement or driveways and before surface restoration, all pavement,
sidewalks, or driveways that were damaged, displaced, or undermined will be trimmed to
neat edges by sawing pavement to a depth of 3 inches or to the depth of existing pavement,
whichever is greater Unless the Engineer directs additional pavement removal, pavement
removal and replacement beyond the pay limits or due to damage by the Contractor's
equipment wdl be at the Contractor's expense
Where indicated on the Plans or as directed by the Engineer, concrete panels shall be
saw cut to facditate pavement removal and to leave a portion of the existing panel to protect
ad�acent concrete panels durmg trenching and pipe laying construction The ad�acent
concrete panels that are to be protected are intended to remain Any ad�acent panels that
are damaged as a result of Contractor's operations shall be replaced at the Contractor's
own expense
Contractor shall exercise care in removal of existing imp�ovements to prevent damage from
construction activities or equipment This shall include damage from vibration equipment
such as �ack hammers In particular, the Contractor shall protect existing sidewalks, curbs,
gutters, and utdity pole foundations due to construction activities m the roadway
Pavement removal shall be done in coordination with the Traffic Control Plan
�**:**.�
Add the following new sections
2-02.3(4) Remove/Abandon Existing Water System (NEW SECTION)
Portions of the existing water systems shall be abandoned in place or removed
Water mam pipe that is abandoned in place shall be capped with an MJ cap at the ends
Existing hydrant assemblies indicated on the plan drawings shall be removed, salvaged, and
delivered to the City
C�ty of Bremerton 236-1896-113 (Ol/04)
Wash►ngton Avenue Sewer Improvements 111-68 November 2013
Contract Documents Div�sion 2
'
'
'
'
'
�
�
'
e
�
�
�
'
�
,
�
�
'
'
�
II
The excavation from any pipe sections that are removed shall be backfilled with crushed
surfacing top course and compacted to minimum 95 percent max dry density
2-02.3(5) Remove/Abandon Existing Sewer System (NEW SECTION)
� Portions of the existing sewer systems shall be abandoned in place or removed This
includes abandoning of the sewer laterals servmg the Washington Avenue residences,
which extend from residential properties and discharge to the sanitary sewer force main
, located below along the beach Access to the beach area for construction shall be at
Evergreen Park, as shown on the Plans Construction activities along the beach shall be
limited to low-tide events and other construction restrictions noted in the JARPA
'
,
LJ
'
,
1
'
'
�
Sewer pipe that is abandoned in place shall be filled with CDF
The excavation from any pipe sections that are removed shall be backfdled with crushed
surFacmg top course and compacted to minimum 95 percent maximum dry density
Abandon existing sewer manholes per Section 7-05 3(2) Manholes less than 5 feet deep
shall be removed and disposed of
2-02.3(6j Remove/Abandon Existing Storm System (NEW SECTION)
Portions of the existing storm drainage systems shall be abandoned in place or removed
Storm drainage pipe that is abandoned in place shall have a concrete plug installed in all
openings The length of plug shall equal finnce the diameter of the pipe
The excavation from any pipe sections that are removed shall be backfilled with crushed
surtacmg top course and compacted to minimum 95 percent maximum dry density
Remove and dispose of existing concrete inlets and storm drainage piping as specified in
the Plans
Abandon existing storm drainage Type 2 catch basins per Section 7-05 3(2) Type 2 catch
basins less than 5 feet deep shall be removed and disposed of
2-02.3(7) Pothole Existing Utility (NEW SECTION)
Locations of possible conflicts at utility crossings can be seen on the Plans Based on the
actual location of utility markings, it may be necessary to uncover existing utdities and
determine the exact locations
' After completmg field marking of the existmg utilities, the Contractor shall determine if an
existing utility may be in conflict with the planned improvements Should a conflict seem
likely, the Contractor shall notify the City If the City concurs that a conflict is likely, the
' Contractor will be directed to expose the location of the sub�ect utility (pothole) When
potholing is required by the City, the Contractor shall expose the location of the existmg
utdity and record the size of pipe and horizontal and vertical location on the Contractor's
' Record Drawmgs Upon receipt of this information, the Engmeer wdl determine if a conflict
exists The City w�l! notify the Contractor withm seven full workmg days as to what design
' City of B�emerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
lll-69
236-1896-113 (01/04)
November 2013
D�wsron 2
1
modifications, � any, are reqwred to resolve the conflict Contractor shall be required to
coordmate with both the utility m question and the City regarding the type of equipment that
wdl be allowed to conduct potholmg (i e, hand-excavation, excavation with vactor truck,
other) Potholing wdl typically be conducted with a vactor truck
2-02.3(8) Ad�ust Existing Utility to Grade (NEW SECTION)
Existing utilities such as monuments, water valves, and meter boxes shall be ad�usted to
finished grade The Contractor shall, prior to the beginning of any work, famdiarize himself
with the existing utility locations The Contractor shall ad�ust City-owned utdities Final
ad�ustment shall be smooth and flush with firnshed grade The Contractor shall mark the
location of all utdities prior to pavmg the new surface Unless otherwise provided for in the
Special Provisions and Proposal, costs for ad�usting utdities to grade, including coordinating
the work with other utdities, shall be incidental to the various items of work and no additional
compensation will be allowed
Existing facdities shall be ad�usted to the finished grade as shown on the Drawmgs and as
further specified herein Existing box, ring, grate, � and cover shall be reset in a careful and
workmanlike manner to conform to the new grade Special care shall be exercised m all
operations Any damage occurring to the manholes, concrete inlets, monument cases, valve
boxes, or water mains, due to the Contractor's operations, shall be repaired at the
Contractor's own expense Ad�ustments shall be made using bricks, concrete blocks, or
cement, and the interior of the manhole ad�ustment shall be mortared smoothly All covers
and frames shall be thoroughly cleaned The Contractor shall be responsible for referencing
and keeping a record of such references of all manholes, catch basms, monument cases,
meter boxes, and valve boxes encountered, and shall submit a copy of these references to
the Eng�neer
The meter boxes, and valve boxes shall be ad�usted to grade in the following manner
• Within a Grass SurFace Provide crushed surfacing top course backfill and 3 mches
of topsod, Type A, and sod
• Within a Hot Mixed Asphalt Paved Surface As soon as the street is paved past each
manhole, catch basin, monument case, meter box, and valve box, the asphalt
concrete mat shall be scored around the location of the manhole, catch basin,
concrete mlet, monument case, meter, or valve box After rolling has been completed
and the mat has cooled, it shall be cut along the scored Imes The manholes, catch
basms, monument cases, meter boxes, and/or vafve boxes shall then be raised to
firnshed pavement grade, and the annular spaces filled with control density fdl (CDF)
to within a mirnmum of 3 inches of the fmished grade The remaining 3 mches
(mmimum) shall be fdled and compacted with HMA Class 1/2 In PG 64-22 per
Section 5-04 of the Standard Specifications, to give a smooth, finished appearance
After pavement is m place, all �oints shall be sealed with hot asphalt cement (AR
4000V1n In areas opened immediately to traffic, a sand blanket shall be placed onto
the surface of the hot asphalt sealer (AR 4000V1n to help alleviate the "trackmg" of
asphalt sealer
C�ty of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer Improvements 111-70 November 2013
Contract Documents Diws�on 2
'
�
2-02.4 Measurement
,
'
'
�
�
'
�
�*.#*.*�
Section 2-02 4 is supplemented with the following
No specific urnt of ineasure shall apply to the lump sum item "Removal of Structures and
Obstructions"
"Ad�ust Existing UUlity to Grade" shall be measured per each .
Ad�ustment of new utdity to grade shall not be measured from separate payment, but mstead
shall be considered incidental to the urnt cost bid for that utdity
"Asphalt Conc Pavement Removal" shall be measured per square yard
"Cement Conc Pavement Removal" shall be measured per square yard
"Cement Conc Sidewalk and Driveway Removal" shall be measured per square yard
regardless of depth
"Cement Conc Curb and Gutter Removal" shall be measured per linear foot
No specific unit of ineasure shall apply to the lump sum items "Remove/Abandon Water
System", "Remove/Abandon Sewer System", and "Remove/Abandon Storm System"
� No measurement for payment shall be made for saw cutting All costs associated with saw
cuttmg shall be included with the associated bid items in the Proposal where saw cutting is
required, such as concrete, sidewalk, asphalt, and pipmg removal
LJ
'
�
'
'
"Pothole Existing Utdity" shall be measured per each pothole
Z-02 5 Payment
�::**.*�
Section 2-02 5 is supplemented with the foilowing
"Ad�ust Existing Utdity to Grade" per each
The unit contract price for "Ad�ust Existmg Utdity to Grade", per each shall be full payment
for all equipment, labor, and materials necessary to ad�ust the utility to fmished grade
including, but not limited to, crushed surFacing top course, grout, CDF, finishing concrete,
asphalt pavement, and edge sealant
"Removal of Structures and Obstructions", per lump sum
� The unit contract price for "Removal of Structures and Obstructions" shall be full
compensation for all labor, tools, equipment, and materials necessary to remove, haul and
dispose of the material off site at a Contractor-obtained legal disposal site In addition, all
, backfill and compaction of backfdl, as defined in the Plans and these Specifications needed
to fdl the void left after the removal shall be included m the lump sum cost for "Removal of
, City of Bremerton 236-1896-113 (01/04)
Washington Avenue Sewer Improvements lll-71 November 2013
Contract Documen[s D�v�s►on 2
'
Structures and Obstructions" Removal of Structures and Obstructions mcludes valve
abandonment
"Asphalt Conc Pavement Removal", per square yard
"Cement Conc Pavement Removal", per square yard
Payment for "Asphalt Conc Pavement Removal" and "Cement Conc Pavement Removal"
wdl be full compensation for all costs associated with sawcutting, removing, and disposing of
the pavement materials regardless of depth, in accordance with the Contract Documents
"Cem`ent Conc Sidewalk and Driveway Removal", per square yard
"Cement Conc Curb and Gutter Removal", per linear foot
Payment for "Cement Conc S�dewalk and Driveway Removal" and "Cement Conc Curb and
Gutter Removal" shall be full compensation for all costs associated with saw cutting,
removing, and disposing of the concrete materials regardless of depth, m accordance with
the Contract Documents
All saw cutting shall be included in the other associated bid items in the Proposal and no
additional compensation wdl be made
"Remove/Abandon Water System", per lump sum
"Remove/Abandon Sewer System", per lump sum
"Remove/Abandon Storm System", per lump sum
The bid price in the Proposal for "Remove/Abandon Water System", "Remove/Abandon
Sewer System", and "Remove/Abandon Storm System" shall be full compensation for the
costs of all labor, tools, equipment, and materials necessary to remove, haul, and dispose of
all piping, fittings, structures, capping, filling pipe w�th CDF, and other items associated with
the water, sewer, and storm systems as described in the Pians and these Specifications
"Pothole Existing Utility", per each
The urnt price for "Pothole Existing Utility" shall include the complete cost to provide trafFc
control, saw cut, remove pavement, excavate and expose main, obtain measurements,
backfdl, and temporari{y restore the surface
2-04 HAUL
2-04 5 Payment
�*�**:*�
Section 2-04 5 is supplemented with the following
All costs associated with hauling materials of any description to, from, and within the pro�ect
site shall be included in the appropriate urnt bid prices in the Proposal and no further
compensation will be paid
City of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer Improvements lll-72 November 2013
Cornract Documents D�vision 2
,
�
2-06
' 2-06.3
�
�
L_1
'
LJ
SUBGRADE PREPARATION
Construction Requirements
�*.****�
Section 2-06 3 is supplemented with the following
During the period of subgrade exposure, only local traffic wdl be allowed on this section The
subgrade must be suitable, as determined by the Engineer, prior to placement of gravel
borrow or crushed rock All costs for protection of the subgrade, including replacing all
material that becomes unsuitable while the subgrade is exposed, shall be included m the
other related bid items of the Contract and no additional compensation shall be made
Preparation and compaction of the subgrade shall be considered as essential to the
construction but all costs thereof shall be included by the Contractor m crushed surfacing
base course pay items for roadway work and in the individual pipe mstallation costs of the
Contract The subgrade shall be shaped and maintained to drain at all times during
construction, mcluding temporary ditches and modifications to drainage structures
necessary to eliminate standmg water on the subgrade
2-07 WATERING
� 2-07.3 Descript�on
'
,
'
'
�
'
�.*:�*.*�
Section 2-07 3 is supplemented with the following
Water may be obtained from City hydrants Obtain a hydrant meter m accordance with
Section 1-05 16
2-07.5 Payment
�***.**�
Replace Section 2-07 5 with the followmg
No specific payment for furrnshing and placing water shall be made Water used for fi(ling
water mains shall be considered incidental to those bid items Water required for dust and
mud control wdl be considered incidental to the "Erosion/Water Pollution Control" bid item
2-09
2-09.1
STRUCTURE EXCAVATION
Description
��.*»**��
' Section 2-09 1 is supplemented with the following
Structure excavation shall include excavation for structures associated with this pro�ect See
' Division 7 of the Standard Specifications and these Special Provisions for work related to
trenchmg, excavating, and backfdimg
' Ciry of Bremerton 236-1896-113 (Ol/04)
Wash►ngton Avenue Sewer Improvements lll-73 November 2013
Contract Documen[s Div�s►on 2
�
2-09 3 Construction Reqwrements
�.*..**�
Add the following new section
2-09.3(1)G Trench Dewatering (NEW SECTION)
All "Iocali2ed trench dewatering" work associated with maintammg a trench suitable for
structure mstallation and pipeline construction will be incidental and included in bid item
"ErosionNVater Pollution Control" "Localized trench dewatenng° is defined as dewatering
methods occurring in or directly adJacent to the trench, including trash pumps, sump pumps,
or other methods in the excavated areas "Localized trench dewatermg" does not include a
dewatering system such as well points, well screens, or deep wells
2-09.3(4) Construction Requirements, Structure Excavation, Class B
�****.*�
Section 2-09 3(4) is supplemented with the following
Shoring and trench safety system shall be the sole responsibility of the Contractor All
trenches greater than 48 inches in depth shall be shored Shoring shall comply with
Chapter 296-155 WAC and Chapter 49 17 RCW of the Washmgton Safety and Health Act
�,�*#***�
Add the following new section
2-09 3(9) Removal and Disposal of Contaminated Material (NEW SECTION)
Removal and Disposal of Contaminated Material
Contaminated sods are anticipated along Sheldon Boulevard and potentially other locations
ad�acent to Evergreen Park, the former Brem-Air Facdity In 2000, the City removed all the
underground fuel storage tanks, mcluding known sites of contammated soils, however, there
may be soil locations beneath Sheldon Boulevard that are contaminated with hydrocarbons
The Contractor is responsible for all work, records, reports, permitting, and testing required
to perForm the work described in this section At a minimum, contammated sod and water
shall be tested for gasoline, benzene, toluene, ethylbenzene, xylenes, diesel, and lube oi{
using Washington State Department of Ecology approved methods
The Contractor shall notify the Engineer immediately if contammation is discovered or is '
suspected through observations, such as an ody sheen or discolored sods that may or may
- not emit strong chemical odors
Contaminated Soil
All material that �s designated by the Engmeer to be removed shall be handled and stored m
a manner that prevents the spread of contamination to ad�acent soil or water Separate
stockpiles shall be maintained for known contaminated material and for suspected
contaminated material The Contractor shall transport contaminated material and dispose of
it at a permitted fac�lity The Contractor shall provide the Engineer with a copy of the
shipping marnfest or bill of lading indicating the amount of material hauled to disposal, and
bearing the disposal site operator's confirmation for receipt of the material
C�ty of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
lll-74
r
�J
�
236-1896-113 (Ol/04) �
November 2013
Division 2
'
�
I�
,
,
'
'
i�
,
,
�
Contaminated Water
All water that is removed from the areas of contamination, including free water that leeches
from contammated sod stockpdes or water that is suspected of being contaminated, shall be
collected, handled, and stored m a manner that prevents the spread of contamination to
ad�acent soil or water The Contractor shall transport contaminated water and dispose of it
at a permitted facdity The Contractor shall prowde the Engineer with a copy of the shipping
manifest or bdl of lading indicating the amount of material hauled to disposal, and bearing
the disposal site operator's confirmation for receipt of the matenal
Training Requirements
All Contractor personnel performing excavation, sampling, and/or other cleanup work
involving contaminated sod and/or water, once identified after initial discovery, shall possess
training meeting the requirements of the Washington Department of Labor and Industries
safety regulations for Hazardous Waste Operations (WAC 296-843) This requirement
applies to all personnel includmg laborers, supervisors, and equipment operators
2-09.4 Measurement
��.:.**�
Section 2-02 4 is supplemented with the following
"Contaminated Material Excavation Incl Haul" wdl be measured by the ton
No measurement will be made for any class of structure excavation
No specific unit of ineasurement shall apply to the lump sum item of "Shoring or Extra
Excavation Class B"
' 2-09.5 Payment
�
'
,
'
�****:.�
Section 2-02 5 is supplemented with the following
"Contaminated Material Excavation Incl Haul", per ton
The unit contract price per ton for "Contaminated Material Excavation Incl Haul" shall be full
pay for all fees, materials, labor, tools, and equipment necessary to remove and dispose of
hazardous sod and water mcluding excavating and stockpiling contammated sods, collecting,
handling, and storing contaminated water, testing, marnfesting, loading stockpded and
stored material into the hauling conveyance for transport to the disposal site, and
transporting and disposing of hazardous or contaminated matenals at an approved facility
"Shoring or Extra Excavation Class B", per lump sum
The lump sum price in the Proposal wdl be full compensation for the cost of all labor, tools,
' equipment, and matenals necessary or incidental to furnishmg, mstalling, and removmg
shoring systems When extra excavation is used in lieu of constructing the shoring,
cofferdam, sheet pdes, or caisson, the lump sum contract price shall be full pay for all
' excavation, backfdl, compaction, and other work required
' C�ty of Bremerton 236-1896-113 (O7/04)
Wash�ngton Avenue Sewer Improvements lll-75 November 2013
Contract Documents D�v�sion 2
'
2-11
2-11.1
TRIMMING AND CLEANUP
Description
�******�
Section 2-11 1 is supplemented with the following
During construction, and then upon completion of the work, the Contractor shall thoroughly
comb and search the surrounding area and remove any construction material thrown or
discarded amongst the trees, bushes, ditches, etc , such as pamt cans, cartons, broken
pipe, pavement pieces, paper, bottles, etc , and shall tidy up the surrounding general area to
make it neat in appearance, including removal of debris that may or may not have been
deposited by Contractor's operation �
Paved street surfaces, existing and new, shall be thoroughly cleaned (street sweeper) upon
completion of work within the area, and shall require dady cleaning if dust or mud exists
Prior to �ob acceptance, all streets shall be cleaned
2-11 3 Construction Requirements
�.**.**�
Add the following new sections
2-11.3(1j Routine Cleaning (NEW SECTION)
General
1 Retain all stored materials and equipment in an orderly fashion allowing maximum e
access, not impeding dramage or traffic, and providing protection
2 Do not allow the accumulation of scrap, debris, waste material, and other items not
required for this work
3 At least twice each month, and more often if necessary or as directed by the
Construction Inspector, the Contractor shall completely remove all scrap, debris, and
waste material from the pro�ect site
4 Provide adequate storage for all materials awaiting removal from the pro�ect site,
observing all reqwrements for fire protection and protection of the environment
Site '
1 Dady and more often if necessary or as directed, inspect the site and pick up all scrap,
debris, and waste material Remove all such items to the place designated for their
storage until it can be disposed of
2 Weekly, and more often if necessary or directed, inspect all arrangements of mater�als
stored on the site, restack, tidy, or otherwise service all arrangements to meet the
requirements above
3 Maintain the site in a neat and orderly condition at all times so as to meet the approval of
the Owner
City of Bremerlon 236-1896-113 (O7/04)
Wash�ngton Avenue Sewer Improvements lll-76 November 2013
Contract Documents Divis�on 2
�
'
�J
CI
'
'
IJ
�I
'
�
'
'
�
'
lJ
�***:**�
Add the following new section
2-11 3(2) Final Cleaning (NEW SECTION)
Prior to final inspection, remove from the �ob site, all tools, surplus materials, equipment,
scrap, debris, and waste
2-11.5 Payment
�***:*.�
Section 2-11 5 is supplemented with the following
No separate payment wdl be made for trimming and cleanup, but instead wdl be included in
the lump sum item for "Removal of Structures and Obstructions"
� 2-12
�
2-12.1
CONSTRUCTION GEOSYNTHETIC
Description
�*.****�
Section 2-12 1 is supplemented with the following
'
'
The Contractor shall fumish and place geotextile in accordance with the details and these
Specifications Geotextdes are required to be used with "Foundation Matenal"
The Contractor shall furnish and place construction geotextile (for separation and
stabilization) and polypropylene geogrid reinforcement in accordance with the details shown
in the Plans and these Specifications
� 2-12.2 Materials
�**.*:�.�
' Section 2-12 2 is supplemented with the following
The polypropylene geogrid remforcement mesh shall be integrally formed and produced
, from a punched sheet of polypropylene which is then onented in three substantially
equilateral directions so that the resultmg ribs shall have a high degree of molecular
onentation, which continues at least in part through the mass of the integral node The
resulting geogrid structure shall have apertures that are triangular in shape, and shall have
, ribs and depth-to-width ratios greater than 1 Q The geogrid shall have the typical
characteristics shown below
' Proqerties
Rib pitch, mm (in)
Mid-rib depth, mm (in)
Mid-rib width, mm (in)
, Rib shape
Aperture shape
Lon�c itudinal Dia�
40 (1 60) 40 (1 60)
— 1 3 (0 05)
— 0 9 (0 04)
Transverse
1 2 (0 05)
1 2 (0 05)
General
Rectangular
Triangular
� The Contractor shall check the geogrid upon delivery and prior to installation to ensure that
the material is free of flaws or damage occurring from manufacturing, shipping, or handling
' Ciry of Bremerton 236-1896-113 (01/04)
Wash►ngton Avenue Sewer Improvemen[s lll-77 November 2013
Contract Documents Diws�on 2
'
2-12.3 Construction Requirements
�.*.***�
Section 2-12 3 is supplemented with the following
Geogrid shafl be placed in areas detailed in the Plans or as directed by the Engineer Under
no circumstances shall geogrid be dragged through mud or over sharp ob�ects that could
damage the geogrid
The geogrid may be temporarily secured in place with ties, pins, sand bags, or backfill as
required by fill properties, fdl placement procedures, weather conditions, or as directed by
the Engineer
Should the geogrid be torn, punctured, or the overlaps or sewn �oints be disturbed, as
evidenced by visible geotextde damage, subgrade pumping, intrusion, or roadbed distortion,
the backfdl around the damaged or displaced area shall be removed and the damaged area
repaired or replaced by the Contractor at no expense to the Contracting Agency The repa�r
shall consist of a patch of the same type of geogrid material as used throughout the pro�ect
The patch shall overlap the damaged area by a mirnmum of 3 feet from the edge of any
damaged area
Geogrid shall be overlapped a mirnmum of 2 feet at all longitudinal and transverse �oints The
initial backfdl thickness shall be as specified by the manufacturer Backfill shall be placed,
spread, and compacted in such a manner that mirnmizes the development of wrmkles in the
geognd and/or movements of the geognd Turrnng and breakmg of vehicles should be kept to
a minimum to prevent tracks from displacing the fill and damagmg the geogrid
2-12 4 Measurement
�*.**.��
Section 2-12 4 is supplemented with the following
No measurement wdl be made for geotextile used in con�unction with "Foundation Material"
All costs incurred for this item shall be included in the other related bid items
"Geogr�d Reinforcement" shall be measured by the square yard of ground surFace area
covered No measurement or allowance will be made for required overlap of ad�acent rolls,
mcluding the geogrid material placed within the shallow sewer trench
2-12.5 Payment
�**::::�
��� Section 2-12 5 is supplemented with the followmg
"Geogrid Reinforcement", per square yard
The unit contract price for "Geogrid Reinforcement" shall mclude all equipment, labor, tools,
and materials necessary to furnish and install the geogrid as specified in the Special
Provisions and on the Plans
END OF DIVISION 2
C�ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements 111-78 November 2013
ConVact Documents D�vis�on 2
�
'
,
�
,
'
�
�
'
'
'
'
�
'
'
�
'
�
'
DIVISION 3
AGGREGATE PRODUCTION AND ACCEPTANCE
3-01 PRODUCTION FROM QUARRY AND PIT SITES
3-01 4 Contractor Furrnshed Material Sources
�:��x..�
Section 3-01 4 is supplemented with the following
No source has been provided for any materials necessary for the construction of this
improvement
The Contractor shall make arrangements to obtam the necessary materials at no expense to
the City, and all costs of acquinng, producmg, and placing this material in the finished work
shall be included in the unit contract prices for the various items involved
3-01.6 Payment
�«..*:.� r
Section 3-01 6 is supplemented with the following
All costs of any work required under Division 3 shall be included m the urnt contract prices
for the various items m the Proposal
END OF DIVISION 3
C�ty of Bremenon
Wash�ngton Avenue Sewer Improvements
Contract Documents
lll-79
236-1896-113 (01/04)
November 2013
Divis►on 3
THIS PAGE INTENTIONALLY LEFT BLANK
�
�<<
, }�
C�ty of Bremerton 236-1896-113 (O7/04)
Washmgton Avenue Sewer Improvements 111-80 November 2013
Contract Documents D�v�s�on 3
,
'
'
' 4-04
4-04.1
DIVISION 4
BASES
BALLAST AND CRUSHED SURFACING
Description
' �***�**�
Section 4-04 1 is supplemented with the following
' Crushed surfacing top course shall be used as required for driveway and roadway
reconstruction Crushed surfacing top course shall also be used for restoration along the
finished edge of asphalt concrete pavement when such edge abuts an existing gravel or
' crushed surfacmg shoulder Crushed surfacing shall be placed m accordance with the
Standard Specifications and as shown in the Plans or as designated by the Engineer
LJ
'
,
'
�
'
�
Crushed surfacing top course wdi be used for pipe/structure backfdl within WSDOT right-of-
way and for pipe/structure bedding
Crushed surfacing top course and base course shall be used as required under asphalt and
cement concrete pavements
4-04.4 Measurement
�.*.:**�
Section 4-04 4 is replaced with the following
The basis of ineasurement for "Crushed Surfacmg Top Course" ""will be by the ton based on
certified truck tickets collected by the inspector at the end of each working day Tickets wdl
be accepted for payment after the end of each workmg day only when prior arrangements
have been made with the inspector
Crushed surFacmg used for pipe beddmg, pipe trench backfill, and to fdl voids left by
demolished structures will not be measured for separate payment but instead will be
incidental to the water, sewer, and storm piping bid items in the Proposal
If the Contractor chooses to stockpile crushed surfacing materials on or near the site, the
Contractor shail establ�sh separate stockpde areas for
1 Crushed surfacing materials that are to be used in the roadway and paid for
' separately Improvements where crushed surFacmg will be paid for separately are as
follows
'
�
a Gravel shoulder restoration
b Gravel road restoration
c In the road sections under HMA and curb and gutter as shown in the Plans
, C�ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
lll-81
236-1896-113 (01/04)
November 2013
D�vision 4
'
2 Crushed surFacmg materials incidental to other items include pipe bedding, trench
backfill, and to fill voids left by demolished structures Crushed surfacmg material
used during these activities will not be measured for separate payment
Water used in placing and compacting surfacing materials will not be measured for
payment
4-04.5 Payment
�..**..�
Section 4-04 5 is supplemented with the following
"Crushed Surfacing Top Course", per ton
The contract bid price for "Crushed Surfacing Top Course", including all incidental work,
shall be full compensation for all labor, material, tools, and equipment necessary to
satisfactordy complete the work as defined in the Standard Specifications and these Special
Provisions, mcluding subgrade preparation and compaction
END OF DIVISION 4
C�ty of Breme►ton
Wash�ngton Avenue Sewer Improvements
Contract Dvcuments
111-82
236-1896-113 (01/04) �
November 2013
D�v�s�on 4
,
'
�
,
' 5-04
5-04 1
DIVISION 5
SURFACE TREATMENTS AND PAVEMENTS
HOT MIX ASPHALT
Description
' �****#*�
Section 5-04 1 is supplemented with the followmg
' This work shall consist of providing and placing one or more layers of plant-mixed hot-mix
asphalt (HMA) on a prepared foundation or base in accordance with these Specifications
and the lines, grades, thickness, and typical cross sections shown in the Plans
'
'
This work shall include the installing asphalt concrete pavement for the construction of
roadways, driveways, and other areas as shown on the Pians
HMA shall be composed of asphalt binder and mineral materials as may be required, mixed
in the proportions specified to prov�de a homogeneous, stable, and workable mixture
' 5-04.2 Materials
�
'
'
�
�:.*.**�
Section 5-04 2 is supplemented with the following
All asphalt concrete shall be HMA Class 1/2-In PG 64-22 (N-design - 75 gyration unless
otherwise noted m the Pro�ect Special Provisions)
Tack coat shall be emulsified asphalt grade CSS-1 as specified m Section 9-02 1(6),
Cationic Emulsified Asphalt, of the Standard Specifications and will be used at locations
specified or as directed by the Engineer
All costs for tack coat shall be considered incidental to and included m other unit contract
prices
5-04,3 Construction Requirements
' �*.:.**�
Section 5-04 3 is supplemented with the following
' Where the new HMA pavement connects to the existing pavement, the transition shall
produce a smooth nde The surface of the pavement through the connection shall not vary
more than 1/8 inch in 10 feet
�_l
'
�
If the edges of existing remaming pavement become broken, uneven, or �agged prior to
placement of new asphalt abutting those edges, the existing pavement shall be re-saw cut
to provide a smooth, even edge pnor to placement of the new asphalt
C�ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements lll-83 November 2013
Contract Documents D�v�sion 5
'
5-04.3(7) Preparation of Aggregates
5-04.3(7)A Mix Des�gn
�**...*�
Replace Section 5-04 3(7)A with the following
1 General Prior to the production of HMA, the Contractor shall determine a design
aggregate structure and asphalt bmder content in accordance with WSDOT Standard
Operating Procedure 732 Once the design aggregate structure and asphalt binder
content have been determined, the Contractor shall submit the HMA mix design on DOT
form 350-042 demonstrating the design meets the requirements of Sections 9-03 8(2)
and 9-03 8(6) HMA accepted by nonstatistical evaluation requires a mix design
verification For HMA accepted by commercial evaluation only the first page of DOT form
350-042 and the percent of asphalt binder is required In no case shall the paving begin
before the determmation of anti-strip requirements has been made Anti-strip
requirements wdl be determined by
a Testing by WSDOT �n accordance with TM 718
b Testmg by Contractor in accordance with WSDOT TM 718
c Historical aggregate source ant-strip use provided by WSDOT
The mix design will be the initial Job Mix Formula (JMF) for the HMA being produced
Any additional ad�ustments to the JMF wdl require the approval of the Pro�ect Engmeer
and may be made per Section 9-03 8(�
2 Mix Design Verification Venfication shall be accomplished by one of the following
processes
a Submit samples to WSDOT State Materials Lab for WSDOT verification testmg in
accordance with WSDOT Standard Specifications
b The contracting agency will perform tests to verify the mix design in accordance
with the Field Verification Testmg Process
c Reference a mix design that has been previously verified by the Field Verification
Testing Process or verified by WSDOT State Materials Lab on a previous pro�ect
d Perform Field Verification Testmg on a sample of HMA provided by the
Contractor prior to paving
Mix design verification is valid for one year from the date of verification At the discretion
of the Engineer, agencies may accept mix designs verified beyond the verification year
with certification from the Contractor that the materials and sources are the same as
those shown on the original mix design
C�ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements lll-84 November 2013
Contract Documents D►ws�on 5
'
�
,
1
�
'
�
'
3 Field Verification Testing Process The Contracting agency wdl collect three Production
Samples of HMA on the first day of paving per AASHTO T 168 sampling procedures
a The Contracting agency wdl test one Production Sample in accordance with
Section 5 04 3(8)A for field verification per the requirements of Section 9-03 8(7)
b If the test results from the first Production Sample are within the tolerances of
Section 9 03 8(7), the mix design will be considered verified and the test results
wdl be used as acceptance sample number one
c If the test results from the first Production Sample are outside the tolerances of
Section 9 03 8(7), the other two samples wdl be tested and the results of all three
tests will be used for acceptance in accordance with Section 5-04 5(1) and wdl be
used in the calculation of the CPF the maximum CPF shall be 1 00
4 Prior to the first day of paving, six Ignition Furnace Calibration Samples shall be
obtamed to calibrate the Igrntion Furnaces used for acceptance testing of the HMA
Calibration samples shall be provided by the Contractor when directed by the Engineer
Calibration samples shall be prepared in accordance with WSDOT SOP 728
5-04 3(8) Mixing
' 5-04 3(8)A Acceptance Sampling and Testing — HMA Mixture
�'
'
�
�
�
�
l_l
�
�**#***�
Items 1 and 2 are deleted and replaced with
General Acceptance of HMA shall be as defined under nonstatistical or commercial
evaluation
Nonstatistical evaluation wdl be used for all HMA not designated as Commercial HMA in
the contract documents
Commercial evaluation wdl be used for Commercial HMA and for other classes of HMA
in the following applications sidewalks, road approaches, ditches, slopes, paths, trails,
gores, prelevel, and pavement repair Other nonstructural applications of HMA accepted
by commercial evaluation shall be as approved by the Pro�ect Engineer Sampling and
testing of HMA accepted by commercial evaluation will be at the option of the Pro�ect
Engineer Commercial HMA can be accepted by a contractor certification letter stating
the material meets the HMA requirements defined in the contract
Item 4, is replaced with the following
4 Defmition of Sampling Lot and Sublot For the purpose of acceptance sampling and
testing, a lot is defined as the total quantity of material or work produced for each �ob mix
formula (JMF) placed Only one lot per mix design wdl be expected to occur The irntial
JMF is defined in Section 5-04 3(7)A Mix Design The Contractor may request a change
m the JMF in accordance with Section 9-03 8(7) If the request is approved, all of the
material produced up to the time of the change will be evaluated on the basis of tests on
samples taken from that material and a new lot will begm
, C�ty of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
lll-85
236-1896-113 (01/04)
November 2013
D�v�s�on 5
'
For proposal quantit�es, less than 2,500 tons sampimg and testing for evaluation shall be
performed as descnbed in Section 5-04 3(7)A, Item 3, Field Venfication Testing Process
The verification sample referenced in Item 3b may be used as an acceptance sample,
additional testing wdl be at the discretion of the Engmeer When using a previously
verified mix design, testing for volumetric properties may be waived at the engineer's
discretion At least one acceptance sample is required when using this method of
acceptance
For proposal quantities greater than 2,500 tons sampling and testing for evaluation shall
be perFormed as described in Section 5-04 3(7)A, Item 3, Field Verification Testing
Process, for the first 2,500 tons of mix placed The verification sample referenced in Item
3b may be used as an acceptance sample for the first 2,500 tons of mix placed
Additional testing will be at the rate of one sample per 800 tons of m�x placed or as
directed by the Engineer When using a previously verified mix design, testing for
volumetric properties may be waived at the Engineer's discretion
Item 7 of Section 5-04 3(8)A is deleted
5-04.3(10) Compaction
5-04.3(10)B Control
�.**».*�
Section 5-04 3(10)B is supplemented with the following
Asphalt shall be compacted to 91 percent of maximum density as determined by WSDOT
Test Method 705 Compaction tests wdl be performed by a testing laboratory contracted by
the Owner
All acceptance test results wdl be made avadable to the Contractor upon request as soon as
completed
Compaction test taken on the day of pavmg will be based on a theoretical RICE value
supplied by the Contractor prior to paving A sample of the asphalt wdl be taken on the day
of paving to determine the actual value Final compaction test results will be based on the
actual RICE value result from the sample taken on the day of paving The basis of
acceptance will be the revised compaction values
C�ty of Bremerton
Wash►ngton Avenue Sewer Improvements
Contract Documents
111-86
236-1896-113 (01/04) �
November 2013
Diws►on 5
IJ
'
'
'
1
,
�
'
r �
�
5-04.3(17) Paving Under Traffic
�*.*.*.�
Section 5-04 3(17) is replaced with the following
The Contractor shall mmimize any pavement drop-offs or abrupt pavement edges to traffic
during non-workmg hours Unless otherwise approved by the Engineer, pavement drop-offs
or abrupt pavement edges left exposed to traffic during non-working hours shall be
protected as follows
• Drop-offs up to 0 20 foot, unless otherwise directed by the Engineer, may remain
exposed with appropriate warning signs alerting motonsts of the condition
• Drop-offs more than 0 20 foot that are within the traveled way shall be protected with
appropriate warning signs and further protected by the following
➢ A wedge of asphalt cold mix or other material approved by the Engineer shall be
placed at a slope of 4 to 1 or flatter
➢ Channelization devices shall be placed along the traffic side of the drop-off or abrupt
pavement edges and shall comply with the latest edition of the MUTCD Pavement
drop-off warning signs shall be placed in advance of and throughout the drop-off
area
' ➢ Open trenches within the traveled way shall have a steel plate cover placed over
them A wedge of asphalt cold mix or other material approved by the Engmeer shall
be placed along the sheet edges to provide a smooth transition between the
' pavement and the steel plate Waming signs shall be used to alert motorists of the
presence of the steel plates
'
,
'
�
'
,
C J
��**.**�
Replace vacant section 5-04 3(18) with the following new section
5-04.3(18) Cold Mix (NEW SECTION)
During the course of construction, it may be necessary to provide improved temporary
access along the streets within the construction route and such ma�or property access roads
as may be designated by the Engmeer in the field Such improved temporary access shall
be provided by patchmg the crossings and designated entrance roads with cold mix asphalt
concrete, untd such time as the permanent asphalt pavement is installed The backfill shall
be thoroughly compacted and brought to a smooth grade prior to placing the material This
cold mix asphalt concrete shall consist of a mixture of mineral aggregate and a minimum of
5-1/2 percent cutback asphalt binder MC-250, combined in a mechanical mixture It shall be
placed, compacted by approved means, and maintained (dady), and removed and waste-
hauled at no cost to the City by the Contractor when no longer required Cold mix shall be
removed in its entirety before HMA is placed
, Ciry of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
111-87
236-1896-113 (Ol/04)
November 2013
Diws�on 5
1
5-04 4 Measurement
�..***.�
Section 5-04 4 is supplemented with the followmg
Asphalt placed outside the thickness tolerances allowed within the Standard Specifications
will not be measured for payment The Contractor is encouraged to assure that the crushed
surfacing is graded to the proper elevations to avoid exceeding the compacted thickness
shown on the typical sections
"Cold Mix" shall be measured per ton based on certified truck tickets collected on the day of
delivery Only cold mix that is specifically required by the City will be measured for payment
Cold mix placed without prior City approval wdl not be measured for payment
All costs for minimizing drop-offs and mamtainmg access to existing streets and driveways
including, but not limited to, steel sheeting and channelization devices, shall be included by
the Contractor m the unit price bid for the vanous items in the Bid Proposal, and no
additional or separate compensation wdl be allowed Payment for asphalt cold mix for steel
sheeting transition shall be made at the urnt price bid
"HMA CI 1/2 In PG 64-22" wdl be measured per ton based on certified truck tickets
collected on the day of paving
No measurement will be made for asphalt used in con�unction with ad�usting utilities to final
g rade
5-04.5 Payment
�.*****�
Section 5-04 5 is replaced with the followmg
Payment wdl be made in accordance with Section 1-04 1, for the following bid items
"Cold Mix", per ton
The unit price bid per ton for °Cold Mi�' shall constitute full compensation for all labor,
materials, tools, and equipment necessary and incidental to furnishing, placing, and
maintainmg asphalt cold mix Disposal of "Cold Mix" after use shall be incidental to the bid
item and no additional compensation will be made
"HMA CI 1/2 In PG 64-22", per ton
The unit bid price per ton for "HMA CI 1/2 In PG 64-22" shall be full pay of all equipment,
and labor required, and shall include but not be limited to tack coat, surFace preparation,
haul, compaction, additives, temporary striping, and edge sealing
All costs for minimizing drop-offs and mamtainmg access to existing streets and driveways
including, but not limited to, placing cold mix, steel sheeting, and channelization devices,
shall be included by the Contractor in the unit price bid for the various items m the Bid
Proposal No additional or separate compensation wdl be allowed
C�ty of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer Improvements 111-88 November 2013
Contract Documents Diws►on 5
�
�
'
'
'
�
�
'
'
�
'
�
'
'
'
�
'
'
,
5-05 CEMENT CONCRETE PAVEMENT
5-05 4 Measurement
�*�.****�
Section 5-05 4 is supplemented with the following
Dowels, tie bars, and concrete dnll holes shall be considered incidental to the cement
concrete pavement
END OF DIVISION 5
C�ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
lll-89
236-1896-113 (Ol/04)
November 2013
D�v�s�on 5
�
THIS PAGE INTENTIONALLY LEFT BLANK
,
C►ry of Bremerton
Washmgton Avenue Sewer Improvements 111-90
Contract Documents
236-1896-113(01/04)
November 2013
D�v�s�on 5
�
�
�
DIVISION 6
�
'
II
'
'
�
�
'
1
'
STRUCTURES
6-02 CONCRETE STRUCTURES
6-02.3 Construction Requirements
6-02.3(1) Classif�cation of Structural Concrete
�******�
Section 6-02 3(1) is supplemented with the following
Concrete Class 3000 shall be used to construct thrust blocking, encasing of shallow sewer
piping, and property restoration as directed by the City's Pro�ect Inspector
6-02.3(2) Proportioning Materials
�******�
Section 6-02 3(2) is supplemented with the following
Concrete materials for this pro�ect shall be proportioned in accordance with
Section 6-02 3(2) of the Standard Specifications Concrete blocking shall be 1 3 6 mix with
6-inch maximum slump
6-02.3(2)A Contractor Mix Design
��***.*�
The first paragraph of Section 6-02 3(2)A is revised as follows
The Contractor shall submit a mix design for the appropriate class of concrete, as shown in
the Plans and Specifications, for approval by the Engineer
6-02.3(3) Admixtures
' �***.**�
Section 6-02 3(3) is revised as follows
' The Contractor may elect to use air-entrainment for concrete below the finished ground Ime
6-02.3(4) Ready-M�x Concrete
' 6-02.3(4)C Consistency
' �***.**�
The first paragraph of Section 6-02 3(4)C is revised as follows
The maximum slump for vibrated concrete shall be 3 inches, with a 1/2-mch tolerance
�
' City of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements lll-91 November 2013
Contract Documents D►v�s►on 6
�
�.*****�
The final paragraph of Section 6-02 3(4)C is revised as follows
If the Contractor is unable to provide a concrete with a workable consistency, a water-
reducing admixture may be used prowded the batch meets the slump limit and complies
with the proportions required in Section 6-02 3(2)A
6-02.3(5) Acceptance of Concrete
��****.�
The fourth paragraph of Section 6-02 3(5) is revised as follows
Concrete may be tested whenever there is visible change in mix or as required by the
strength-testmg schedule herem specified The concrete properties shall be determmed from
concrete as delivered to the pro�ect and as approved by the Engineer for placement
�.*...*�
The eleventh paragraph is deleted in its entirety
Ei11D OF DIVISION 6
C�ry of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
lll-92
236-1896-113 (O1/04) '
November 2013
D�v�sion 6
�
'
'
'
' 7-04
'
'
DIVISION 7
DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS,
WATER MAINS, AND CONDUITS
STORM SEWERS
7-04.1
Description
�******�
Section 7-04 1 is supplemented with the following
This work consists of constructing tight-line storm drain mam lines as needed to eliminate
conflicts with the proposed utility and roadway improvements
' 7-04.2 Materials
���
'
�***..*�
Section 7-04 2 is supplemented with the following
Trench backfdl and pipe beddmg material withm the road section shall be crushed surFacing
top course
Storm sewer pipe shall be solid wall PVC, ASTM D3034, SDR 26
, 7-04 3
'
�
7-04.3(1)
Construction Requirements
Cleaning and Testing
�::�***»�
Section 7-04 3(1) is replaced with the following
Water for flushing is available from City hydrants using a hydrant meter
�
�
�
,
�
�
The Contractor shall pass a mandrel through the installed pipe to ensure that debris is not
passed through to the existmg system
�***.**�
Add the following new section
7-04 3(2) Connect�ons to Existing Catch Basins and Storm Lines (NEW SECTION)
The locations, type, and size of the existing catch basins and storm lines have been
determined from avadable records, and are approximate, however, it is anticipated that
connections to these existing facilities may be made, in general, as shown on the Plans
It shall be the responsibdity of the Contractor to determine the exact location and ascertain
the type and size of the existmg facilities prior to starting work on each connection, and to
provide any alterations, as required, at no additional cost to the City
C�ty of Bremerton 236-1896-113 (O7/04)
Wash�ngton Avenue Sewer Improvements lll-93 November 2013
Contract Documents D�ws�on 7
�
The Contractor shall clean and regrout existing catch basins as directed by the City
All grouted connections between PVC pipe and concrete structures shall be made with sand
collars
7-04 4 Measurement
�:..*.*�
Section 7-04 4 is replaced with the following
The length of storm sewer pipe wdl be the number of Imear feet of completed installation
measured along the mvert from the center of structure to center of structure or end of pipe
Pipe placed m excess of the length designated by the Engineer wdl not be measured or paid
for
"Solid Wall PVC Storm Sewer Pipe 8 In Diam " shall be measured per linear foot
Excavation, pipe bedding, and trench backfdl with crushed surFacing top course will not be
measured for separate payment
7-04.5_ Payment
�*:****�
Section 7-04 5 is replaced with the following
"Solid Wall PVC Storm Sewer Pipe 8 In Diam ", per Imear foot
The unit contract price for "Solid Wall PVC Storm Sewer Pipe 8 In Diam " shall be full
payment for the complete mstallation of the storm sewer pipe includmg, but not limited to,
supplying and installing the specified pipe, excavation, pipe bedding, laying and �ointing pipe
and fittmgs, trench backfdl, compaction, trench dewatering, connection to new and existing
catch basins with sand collars, grouting of connections, cleaning, and testing These items
shall all be considered as incidental to the work of constructing the storm sewer pipe, and all
cost thereof shall be included m the urnt contract price
Connections to existing and new storm structures and pipes where indicated on the Plans
shall be considered mcidental to the pipe installation unit price and no additional
compensation wdl be made
7-05 MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS
7-05.2 Materials
�..**�.�
Section 7-05 2 is supplemented with the following
All storm drainage and sarntary sewer structures shall have knockouts or be core drilled for
pipe entrances
Use sand collars at connections to structures when PVC pipe is used
City of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer Improvements 111-94 November 2013
Contract Documents D�vision 7
'
,
'
'
'
�
�
,
'
All Joints in the bnck or nng adJustment shall be filled with grout, and the castings shall be
/ seated in grout placed on the top course A 3/8-inch-thick mortar Iming shall be installed
inside and out of the ad�ustment section to provide a smooth, watertight finish
C'�
�
Material for bedding beneath the structures shall be crushed surfacing top course material
Material for replacement of unsuitable foundation material beneath structures shall be
Shoulder Ballast per Standard Specification Section 9-03 9(2) or Recycled Portland Cement
Concrete Rubble per Standard Specification Section 9-03 21(3)
7-05.3 Construction Requirements
�******�
Section 7-05 3 is supplemented with the following
Catch Basin Type 1 shall be constructed per City of Bremerton Standard Detail 4002
Catch Basin Type 2 shall be constructed per City of Bremerton Standard Detad 4004
Sanitary sewer manhole shall be constructed per City of Bremerton Standard Detail 6001
Unless otherwise directed by the Engineer, catch basins and manholes constructed with
precast base sections or cast-in-place sections shall be placed to grade upon 6 inches
(minimum depth) of crushed surFacing top course material All costs associated with this
item shall be included in the various unit prices bid for the structure to be constructed
Special care shall be taken to see that the opernngs through which pipes enter the
structures are completely and firmly packed full of nonshnnk grout to ensure watertightness
�*.*:.*:�
Add the following new section and subsections
7-05.3(6) Manhole Lining with Epoxy Spray Coating (NEW SECTION)
7-05.3(6)A Description
� The work includes lin�ng manholes as specified on the Plans Linmg is by application of a
monolithic high-budd epoxy coating to elimmate infdtration, provide corrosion protection,
repair voids, and enhance structural integrity Procedures for surface preparation, cleaning,
� application, and testing are described herein Lining system shall be Raven 405 or approved
equal
'
7-05.3(6)B
ASTM D638
ASTM D790
ASTM D695
References
�
�
Tensile Properties of Plastics
Flexural Properties of Unreinforced and Reinforced Plastics
Compresswe Properties of Rigid Plastics
ASTM D4541 Pull-off Strength of Coatings Using a Portable Adhesion Tester
ASTM D2584 Volatile Matter Content
ASTM D2240 Durometer Hardness, Type D
, C�ry of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documents
lll-95
236-1896-113 (01/04)
November 2013
D�ws�on 7
'
ASTM D543
ASTM C109
ASTM C348
ASTM C396
ACI 506 2-77
ASTM C579
Resistance of Plastics to Chemical Reagents -
Compressive Strength Hydraulic Cement Mortars
Flexural Strength Hydraulic Cement Mortars ,
Compressive Strength of Cement Mortars
Specifications for Materials, Proportioning, and Application Shotcrete
Compressive Strength of Chemically Settling Silicate and Sdica Chemical
Resistant Mortars
ASTM The published standards of the American Society for Testing and Materials,
West Conshohocken, PA
NACE The published standards of National Association of Corrosion Engineers
(NACE International), Houston, TX
SSPC The pubhshed standards of Steel Structures Painting Council;�Pittsburgh, PA
7-05.3(6)C Submittals
The following items shall be submitted
,, ,
i� '
o Technical data sheet on each product used, including ASTM test results mdicatmg
the product conforms to and is suitable for its intended use per these Specifications
• Material Safety Data Sheets (MSDS) for each product used
• Pro�ect specific guidelines and recommendations
• Qualification of Applicator
• Manufacturer certification that applicator has been trained and approved in the
handling, mixmg, and application of the products to be used
e Certification that the equipment to be used for applying the products has been
manufactured or approved by the protective coating manufacturer and applicator
personnel have been tramed and certified for p�oper use of the equipment
• Five recent references of applicator mdicating successful application, of a high-build
solventless epoxy coating by plural component spray application '
• Proof of any necessary federal, state, or local permits or licenses necessary for the
Pro�ect �
=E
• Design detads for any additional ancdlary systems and equipment to�be used in site
and surface preparation, application, and testing
7-05.3(6)D Quality Assurance
Applicator shall in�tiate and enforce quality control procedures consistent with applicable ASTM,
NACE, and SSPC Standards and the protective coatmg manufacturer's recommendations
C�ry of Bremerton
Washington Avenue Sewer Improvements
Contract Documen[s
lll-96
236-1896-113 (01/04) '
November 2013
D�v�s�on 7
�
,
,
'
'
�
,
�
'
,
�
�
7-05.3(6)E Delivery, Storage, and Handling
Materials are to be kept dry, protected from weather and stored under cover Protective
coating materials are to be stored befinreen 50 degrees F and 90 degrees F Do not store
near flame, heat, or strong oxidants Protective coatmg materials are to be handled
according to their MSDS
7-05.3(6)F Site Conditions
Applicator shall conform with all local, state, and federal regulations including those set forth
by OSHA, RCRA, and the EPA, and any other applicable authonties
7-05.3(6)G Warranty
Applicator shall warrant all work against defects m materials and workmanship for a period
of one year, unless otherwise noted, from the date of final acceptance of the Pro�ect
Applicator shall, within a reasonable time after receipt of written notice thereof, repair
defects in materials or workmanship which may develop during said one year period, and
any damage to other work caused by such defects or the repairing of same, at his own
expense and without cost to the Owner
7-05.3(6)H Repair Materials
Repair matenals shall be used to fill voids, structurally reinforce and/or rebwld surfaces, etc
as determined necessary by the Engineer and protective coating applicator Repair
materials must be compatible with the specified epoxy coating and shall be applied in
accordance with the manufacturer's recommendations
The following products may be accepted and approved as compatible repair basecoat
matenals for epoxy topcoating for use withm the Specifications
' 1 One hundred percent (100%) epoxy grout specifically formulated for epoxy
topcoating compatibility The epoxy grout manufacturer shall provide instructions for
trowel or spray appl�cation, and for epoxy topcoating procedures
' Factory blended, rapid setting, high early strength, fiber reinforced, non-shrink repair mortar
that can be trowelled or pneumatically spray applied may be approved if specifically
formulated to be suitable for epoxy topcoating Such repair mortars should not be used
' unless their manufacturer provides information as to its suitabdity for topcoating with an
epoxy coating
�
L
'
'
Shotcrete shall conform to all requirements of ACI-506 2-77 as publ�shed by the American
Concrete Institute, Detroit, MI, except as modified by these Specifications Shotcrete shall
be composed of Portland Cement, aggregate, and water so proportioned as to produce a
concrete suitable for pneumatic application Shotcrete ingredients shall be selected and
proportioned in such a manner as will produce concrete that wdl be compatible for epoxy
topcoating Shotcrete shall have a mmimum surface tensile strength of 300 psi No coatings
shall be applied prior to a full 28-day cure, unless test patches of coatings exhibit acceptable
bonding characteristics and not outgassing as prescribed herein or the repair mortar
manufacturer certifies acceptable topcoating parameters
' C�ty of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
lll-97
236-1896-113 (01/04)
November 2013
D�v�s�on 7
�
I I
7-05.3(6)I Protective Coating Material
Raven Lining Systems' 405 epoxy coatmg system — a 100 percent solids, solventless
two-component epoxy resin system thixotropic in nature and filled with select fdlers to
mirnmize permeabdity and provide sag resistance acceptable to these Specifications
• Product Type Amine Cured Epoxy
• Color Light Blue
• Solids Content (volume percent) 100
• Mix Ratio 3 1
• Compressive Strength 18,000 psi
• Tensile Strength, psi 7,600 psi
• Tensde Elongation, percent 1 5
• Flexural Modulus, psi 13,000 psi
• Hardness, Type D 88
7-05.3(6)J Appl�cation of Materials
Repair mortar applicators should be trained to properly apply the cementitious mortar
according to manufacturer's recommendations Protective coating must be applied by a
certified applicator of the protective coating manufacturer and according to manufacturer
specifications
Any active flows shall be dammed, plugged, or diverted as required to ensure that the liquid
flow is mamtained below the surfaces to be coated Flows should be totally plugged and/or
diverted when coating the invert All extraneous flows into the manhole, or vaults at or above
the area coated shall be plugged and/or diverted untd the epoxy has set hard to the touch
As an option, hot air may be added to the manhole to accelerate set t�me of the coating
Installation of the protective coating shall not commence untd the concrete substrate has
properly cured in accordance with these Specifications
Temperature of the surface to be coated should be maintained between 40 degrees F and
120 degrees F during application Prior to and during application, care should be taken to
avoid exposure of direct sunlight or other intense heat source to the structure being coated
Where varymg surface temperatures do ex�st, care should be taken to apply the coating
when the temperature is fallmg versus rising (i e, late afternoon mto evening vs morning
into afternoon)
All concrete or mortar that is not sound or has been damaged by chemical exposure shall be
removed to a sound concrete surface All contammants including ods, grease, incompatible
existing coatings, waxes, form release, curing compounds, efflorescence, sealers, salts, or
other contaminants shall be removed Surface preparation method(s) should be based upon
the conditions of the substrate, service environment, and the requirements of the epoxy
protective coatmg to be applied All surfaces shall be repaired as required by the epoxy
protective coatmg system in the mtended service condition
Ciry of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documents
lll-98
236-1896-113 (01/04) '
November 2013
D�v�s�on 7
'
�
�
'
,
,
'
'
1__J
,
�
1
'
�
Surfaces to receive protective coating shall be cleaned and abraded to produce a sound
surface with adequate profde and porosity to provide a strong bond befinreen the protective
coating and the substrate Generally, this can be achieved with a high pressure water
cleaning usmg equipment capable of 5,000 psi at 4 gpm Other methods such as high
pressure water �etting (refer to NACE Standard No 5/SSPC-SP12), abrasive blasting,
shotblasting, grinding, scarifying, or acid etching may also be used Detergent water
cleaning and hot water blasting may be necessary to remove ods, grease, or other
hydrocarbon residues from the concrete Whichever method(s) are used, they shall be
performed m a manner that provides a uniform, sound clean neutralized surface that is not
excessively damaged
A mild chlorine solution may be used to neutralize the surface to dimmish microbiological
bacteria growth prior to fmal rinse and coating
Infiltration shall be stopped by using a material that is compatible with the specified repair
mortar and is suitable for topcoating with the specified epoxy protective coatmg
Test prepared surfaces after cleaning, but prior to application of the epoxy coating to
determine if a specific pH or moisture content of the concrete is required accordmg to
manufacturer's recommendations
The area between the manhole and the manhole nng, and any other area that might exhibit
movement or cracking due to expansion and contraction, shall be grouted with a flexible or
elastomeric grout or gel Castmgs can be abrasive blasted and coated to prevent corrosion if
desired
All surfaces should be inspected by the Inspector during and after preparation, and before
the repair mortar is applied
Areas where structural steel has been exposed or removed shall be repaired in accordance
with the Engineer's recommendations
Repair materials shall meet the Specifications herein The materials shall be trowel or spray
applied utdizing proper equipment on to specified surFaces The material thickness shall be
specified by the Engineer according to Owner's requirements and manufacturer's
recommendations
If using approved cementitious repair mate�ials, such shall be trowelled to provide a smooth
� surface with an average profile equivalent to coarse sandpaper to optimally receive the
protective coating No bugholes or honeycomb surFaces should remain after the final trowel
procedure of the repair mortar
�
,
,
tI
The repair materials shall be permitted to cure accordmg to manufacturer recommendations
Curing compounds should not be used unless approved for compatibdity with the specified
protective coating
Appiication of the repair materials, if not performed by the coatmg certified applicator, should
be inspected by the protective coating certified applicator to ensure proper finishing for
suitability to receive the specified coating
City of Bremerton 236-1896-113 (O7/04)
Wash�ngton Avenue Sewer lmprovements lll-99 November 2013
Contract Documents Divis�on 7
'
After abrasive blast and leak repair is perFormed, all surfaces shall be inspected for
remaining laitance prior to protective coating application Any evidence of remairnng
contamination or laitance shall be removed by additional abrasive blast, shotblast, or other
approved method if repair materials are used, refer to these Specifications for surface
preparation Areas to be coated must also be prepared in accordance with these
Specifications after receiving a cementitious repair mortar and prior to application of the
epoxy coating '
All surFaces should be inspected during and after preparation, and before the protective
coating is applied
7-05.3(6)K Application of Protective Coating
Specified surfaces shall be coated by spray application of a moisture tolerant, solventless,
100 percent solids, self-priming epoxy protective coatmg as further described herein Spray
application will be allowed to minimum and average wet film thickness of 125 mds
Airless spray application equipment approved by the coating manufacturer shall be used to
apply each coat of the protective coating to avoid any potential contammation from
compressed air oil which may encourage inter-coat delamination Air assisted spray
application equipment may be acceptable, especially for thinner coats (<10 mds), only if the
air source is filtered to completely remove all od and water
If necessary, subsequent topcoating or additional coats of the protective coating should
occur as soon as the basecoat becomes tack free, ideally within 12 hours, but no later than
24 hours after the prior coat has been applied at 75 degrees F unless additional prior coat
surface preparation is performed The protective coating manufacturer must be consulted for
any additional-coat surface preparation guidelines, if necessary
7-05.3(6)L Testing and Inspect�on
Durmg application, a wet film thickness gauge, such as those avadable through Paul N
Gardner Company, Inc meeting ASTM D4414 Standard Practice for Measurement of Wet
Fdm Thickness of Orgarnc Coatings by Notched Gages, shall be used to ensure a monolithic
coating and uniform thickness durmg application
Measurement of bond strength of the protective coating to the substrate can be measured in
accordance with ASTM D4541 Any areas detected to have inadequate bond strength shall
be evaluated by the Engineer Further bond tests may be performed m that area to
determine the extent of potentially deficient bonded area and repairs shall be made by
applicator in strict accordance with manufacturer's recommendations
Ciry of Bremerton
Wash►ngton Avenue Sewer Improvements
Con[ract Documents
ll1-100
236-1896-113 (01/04) '
November 2013
Division 7
'
�
�
7-05.4 Measurement
'
,
�****..�
Section 7-05 4 is replaced with the following
Catch basins and sanitary sewer manholes shall be measured per each
Excavation, bedding material, and all backfdl with crushed surfacing top course material to
' the bottom of the surface restoration section as shown on the Plans will not be measured for
payment and shall be considered incidental to and included in the catch basm and sewer
manhole bid items
'
,
,
"Sarntary Sewer Manhole Lining" wdl be measured per each manhole
7-05 5 Payment
�***«:*�
Section 7-05 5 is replaced with the followmg
"Catch Basin, Type 1", per each
All costs associated with furnishing and installing the complete structure, frame and
, grate/solid frame and cover/frame, excavation, backfill with crushed surfacing top course,
foundation matenal, compaction, ad�ustment to final grade, testing, and clearnng shall be
included in the unit contract price for the item mstalled Connecting new and existing pipes
�
to the new structure shall be considered incidental to the bid item
"Manhole In Diam , Shallow", per each
'
,
L� I
'
�
All costs associated with furrnshing and installing the complete structure, solid frame and
cover, sand collars, excavation, trench backfill with crushed surfacing top course, foundation
material, compaction, ad�ustment to final grade, testing, and cleanmg shall be included in
the urnt contract price for the item instafled Connecting new and existing pipes to the new
structure shall be considered incidental to the bid item
"Manhole In Diam , Type 2", per each
All costs associated with furnishing and installmg the complete structure, solid frame and
cover, sand collars, excavation, trench backfill with crushed surfacing top course, foundation
material, compaction, ad�ustment to final grade, testing, and cleaning shall be included in
the unit contract price for the item mstalled Connecting new and existmg pipes to the new
structure shall be considered incidental to the bid item
"Sanitary Sewer Manhole Lirnng", per each
, All costs associated with completmg sanitary sewer manhole lirnng, including furnishing all
equipment, tools, material, and labor shall be included in the unit price in the Proposal Work
including but not limited to, manhole cleaning, making manhole watertight, sealing manhole
' shelf, channeling, and vacuum testing shall be considered incidental to "Sarntary Sewer
Manhole Lining", and no additional compensation wdl be made
' City of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer Improvements ll1-101 November 2013
Contract Documents D�ws�on 7
�
7-08
7-08.2
GENERAL PIPE INSTALLATION REQUIREMENTS
Materials
�:****.�
Section 7-08 2 is replaced with the following
Bedding materials shall be crushed surFacing top course (CSTC) per Section 9-03 9(3) of
the Standard Specifications
Imported trench backfdl shall be crushed surfacmg top course (CSTC) per Section 9-03 9(3)
of the Standard Specifications
Trench Foundation material shall be foundation matenal, Class B, per Section 9-03 17, or
permeable ballast per Section 9-03 9(2) of the Standard Specifications
Trench backfill at sarntary sewer/potable water crossmgs and at sanrtary sewer/stormwater
culvert crossings shall be Controlled Density Fdl per Standard Spec�cation Section 2-09 3(1)
where specified on the Plans or as directed by the City
7-08.3 Construction Requ�rements
�«*****�
Section 7-08 3 is supplemented with the following
All trench backfill shall be imported crushed surfacmg top course material Reuse of native
material as backfdl wdl be allowed only as directed by the Owner and a credit applied back
to the Owner for the volume of crushed surfacing top course material not used at the
Proposal bid item price for roadway work
Pipe shall be installed per the typical trench detads on the Plans
When directed by the Engineer or City Construction Inspector, unsuitable pipe foundation
material shall be removed from the trench subgrade and replaced
Excess or surplus trench excavation material shall be disposed at a site provided by the
Contractor
Installation of water service lines shall include locator wire buried along the entire length of
the pipe Locator wire shall be UL listed, type UF, 14-gauge copper taped to the top of the
pipe to prevent movement during backfdling The wire shall be laid loosely enough to
prevent stretching and damage Locator wire shall be accessible in each meter box All
spl�ces m the locator wire shall be made using a 3M direct bury splice kit, model DBY The
kit shall be installed per the manufacturer specifications The wires shall be tied in a knot
6 to 8 inches from the splice
Locator wire shall be tested prior to acceptance of the pipe system A written notice from the
Contractor to the City finro days pnor to the test is required Locator w�re shall be furnished
and mstalled by the Contractor
C�ry of Bremerton 236-1896-113 (01/04)
Washington Avenue Sewer Improvements ll1-102 November 2013
Contract Documents D�vis�on 7
,
' 1
7-08 3( )
/ 7-08 3(1)A
Excavation and Preparation of Trench
Trenches
�.**:*��
, Section 7-08 3(1)A is supplemented with the following
Where unsuitable material, as determmed by the Engineer, is encountered in the trench
' subgrade below that elevation reqwred for the mstallation of the pipe bedding, it shall be
removed to the depth specified by the Engineer Material to replace unsuitable material thus
removed from the trench shall be compacted Foundation Material
�
Material removed from the trench shall be hauled to a waste or stockpde site
All excavated matenal shall be loaded directly into trucks and hauled to a disposal site
' obtained by the Contractor and acceptable to the Owner's Representative Stockpding of
unsuitable material at the pro�ect site wdl not be allowed
'
�
�
'
L J
�
�***.*.�
Add the following new section
7-08.3(1)D Trench Dewatering (NEW SECTION)
All Trench Dewatering work associated with maintaining an excavation or trench suitable for
structure installation and pipeline construction will be included m the per linear foot price of
the utility being installed Trench Dewatering is defined as dewatering methods occurrmg in
or directly ad�acent to the trench, including trash pumps, sump pumps, or other methods in
the excavated areas
Discharge Location
All water pumped from the trench for trench dewatering shall at a minimum be filtered
through a Dandy Dewatering Bag� prior to discharge to the stormwater system The
discharge locations(s) shall be identified in the Contractor's dewatering submittal for the
Engineer's review as specified herein Disposal of water shall be perFormed in such a matter
as wdl cause no inconvenience whatsoever to the City or to others engaged in work about
the site
The Contractor shall use sediment control methods, as required, at discharge points near
, property lines to prevent silt and sediment from migratmg off-site Additional sediment
control methods can include but are not limited to baker tank, sdtation ponds, fdter fences,
screens, and other methods as required and approved by the Owner
' 7-08.3(3) Backfilling
�**:::.�
/ Section 7-08 3(3) is supplemented with the following
Backfdlmg and surFace restoration shall closely follow the installation of pipe, so that not
' more than 150 feet is left of the trench open at any time during construction without approval
of the City When public safety concerns exist, the City may require more stringent
' C�ty of Bremerton 236-1896-113 (O1/04)
Washington Avenue Sewer Improvements ll1-703 November 2013
Contract Documents D�v�s�on 7
�
�
backfilling standards Selected bedding material shall be placed and compacted around and
under the reclaimed water mains and water mains by hand tools to a height of 6 inches
above the top of the pipe The remaining backfill shall be compacted to 95 percent of the
maximum density in the roadway prism, to 90 percent outside the roadway prism, and shall
be satisfactorily demonstrated to the District by density tests per the WSDOT/APWA
Standard Spec►�cations for Road, Bridge, and Munic�pal Construct�on
Approved native trench backfdl may be used where trenches are excavated outside of
existing paved streets
�.*:**.�
Add the following new section
7-08.3(3)A Vertical Clearance Between Utility Lines (NEW SECTION)
Where the vertical clearance between ad�acent storm drainage lines, water, or sanitary
sewer lines is 2 to 6 inches, an ethylene vinyl acetate pad, Rubatex Laboratories R-5010-A,
or an approved equal, is required The pad shall be 3 feet by 3 feet by 2 5 inches mmimum,
and placed between the new utility pipe and the other utility pipe All costs necessary to
furnish and install the pad shall be considered incidental to pipe laying
7-08.3(4) Plugging Existing Pipe
�..**.*�
Replace Section 7-08 3(4) with the following
Whenever a section of existing pipe is cut, it shall be drained and plugged with concrete or
cementitious grout in accordance with the pipe plug detail to ensure no water or debris can
enter the abandoned pipe CI and DI pipe ends shall be capped with an MJ cap Plugging
existing pipe is considered incidental to all other work
7-08.4 Measurement
�..*..*�
The first, second, and fourth paragraphs of Section 7-08 4 are replaced with the following
No measurement shall be made for protecting of existmg utilities and services, trench
excavation, disposal of excavated material, imported pipe zone bedding and trench backfill
material, and compaction of backfill
Depth of trench backfill material shall be measured to the bottom of the limits of the surface
restoration section as shown on the Plans
Measurement for pipe will be by the linear foot of pipe laid and successfully tested and shall
be along the centerlme of the pipe through fittmgs Measurements will be from the inside
face of structures or manholes not channeled or to the end pipe where it dead-ends beyond
manholes Measurement will be to the nearest foot
C�ty of Bremerton 236-1896-113 (01/04)
Washmgton Avenue Sewer Improvements ll1-104 November 2013
Contract Documents Division 7
,
�
�
,
�f�
'
f-J
�
��
�
�J
II
�
,
'
'
�
I I
�
'
'
No measurement will be made for bedding material and trench excavation including haul
and crushed surFacing top course material backfdl, except for foundation matenal and extra
excavation All costs shall be included in the unit price for the pipe
Measurement of "Unsuitable Pipe Foundation Excavation Incl Haul" will be measured by the
, cubic yard in place of material actually removed Because the amount of such excavation is
unknown, a quantity has been arbitrarily selected to provide a common bid base The unit
price submitted shall be used for all such excavation Material that must be excavated
' during trenching activity or to perform other work as described in the Plans and these
Special Provisions, regardless of the nature of the material, shall not be considered as
unsuitable pipe foundation excavation Additional material excavated as directed by the
' Engineer, to provide a stable subgrade for the pipe foundation, shall be measured as
"Unsuitable Pipe Foundation Excavation Incl Haul"
,
Measurement for "CDF Backfill" wdl be per cubic yard placed
Plugging and removmg existing pipe is not measured
' No separate measurement for payment will be made for Trench Dewatering used in
con�unction with this proJect, but instead all costs shall be mcluded in the unit cost of the
utdity or structure bemg mstalled
' 7-08.5 Payment
,
i
'
'
�
C �
I�I
��
'
'
�:..***�
Section 7-08 5 is supplemented with the following
"Unsuitable Pipe Foundation Excavation Incl Haul", per cubic yard
The urnt bid pnce in the Proposal for "Unsu�table Pipe Foundation Excavation Incl Haul" shall
be full compensation for the costs of all labor, tools, equipment, and materials necessary or
incidental to remove, load, haul, and dispose of the unsuitable material off-site at a
Contractor obtained legal disposai site The unit bid price shall also include all costs
associated with furnishing, installing, haulmg, placing, and compacting the material specified
to replace the unsuitable material and furnishing, hauling and placing geotextile material as
specified in the Plans
"CDF Backfill", per cubic yard
The unit cost in the Proposal for "CDF Backfill" shall be total payment for the difference in
costs for all labor, tools, equipment, and materials necessary to install CDF Backfill in lieu of
beddmg and/or backfdl material
Plugging and/or capping and removing existing pipe is considered inadental to the work
' C�ty of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documents
ll1-105
236-1896-113 (01/04)
November 2013
D�v�s�on 7
'
a
7-09 WATER MAINS
7-091 Description
�*...:*�
Section 7-09 1 is replaced with the following
This work consists of mstalling water mains, services, valves, fire hydrants, and other
connections to existing water mains at the locations shown on the Plans
7-09.2 Materials
�*:::**� �
Section 7-09 2 is supplemented with the following
Trench backfill and pipe bedding shall be as specified m Section 7-08
All water main pipe shall be Class 52 Ductile Iron as shown on the Plans and shall meet all
requirements specified
All ductde iron pipe and fittings shall have restramed �oints in accordance with
Sections 9-30 1(1) and 9-30 2(6)
Materials shall meet the requirements of the following sections
• Ductde Iron Pipe and Fittings Sections 9-30 1(1), 9-30 2(1), 9-30 2(6)
o Gate Valves Sections 7-12 2, 9-30 3(1)
• Valve Boxes Section 9-30 3(5)
e Fire Hydrants Section 7-14 2
Valve Marker Post Valve marker post shall be equal to Fog Tite Meter Seal Company Paint
with two coats of Rust-Oleum high gloss white paint Paint distance from the valve marker to
the valve on the post with black enamel paint Valve marker post to be used for all mainline
valves outside paved areas
7-09 3 Construction Requirements
�::****�
Section 7-09 3 is supplemented with the following
All mechanical �omt fittings shall be restrained with Megalug Series 1100 as manufactured
by EBAA Iron or approved equivalent
C►ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
111-106
t
'
�
�
��
�
�
�
�
�
L�
�
�
'
'
,
236-1896-113 (O1/04) '
November 2013
D�ws�on 7
'
'
'
'
�
'
�
�
�
,
'
��
�
��
�
Contractor shall comply with construction requirements of Sections 7-05, 7-08, and 7-12,
and as modified below
Installation of water mains and service lines shall include locator wire buried along the
entire length of the pipe Locator wire to be 14 gauge and shall be connected to a bolt on
each aboveground hydrant flange with 6 inches of slack at the end for connecting the
locator device Locator wire to be run to 12 inches aboveground at each meter, blow off,
and air/vacuum valve All splices in the locator wire shall be made using a 3M direct bury
splice kit, Model DBY The kit shall be installed per the manufacturer specifications The
wires shall be tied in a knot 6 to 8 inches from the splice
Flange Installation Flange connections shall be installed in accordance with the
Manufacturer's recommended procedure MJ Adapters and flanges shall be centered
and aligned to the mating component before assembling and tightening bolts In no case
shall flange bolts be used to draw the connection into alignment Bolt threads shall be
lubricated, and flat washers should be used under the nuts Bolts shall be evenly
tightened with torque wrench according to the tightening pattern and torque step
recommendations of the Manufacturer At least 1 hour after initial assembly, flange
connections shall be retightened following the tightening pattern and torque step
recommendations of the Manufacturer The final tightening torque shall be as
recommended by the Manufacturer
Pipe Handling When lifting with slings, only wide fabric choker slmgs capable of safely
carrying the load shall be used to lift, move, or lower pipe and fittmgs Wire rope and
chain are prohibited Slings shall be of sufficient capacity for the load and shall be
mspected before use Worn or damaged equipment shall not be used
When runnmg parallel, water lines shall have a minimum separation of 4 feet horizontal
from any reclaimed water lines or sanitary sewer lines Whether running parallel or
crossing, reclaimed water lines shall be installed a minimum of 18 inches above
reclaimed water lines and 18 inches above sanitary sewer Imes Where minimum
separation cannot be achieved, special construction requirements are required as shown
on the Plan Drawings Contractor shall bulkhead CDF with concrete blocks or bricks to
prevent intrusion of trench backfdl material and to achieve the dimensional requirements
of the concrete encasement
' 7-09.3(7) Trench Excavation
�
'
�I,
�
�
�..::►..�
Section 7-09 3(7) is supplemented with the following
Trenches shall be excavated to the line and depth shown on the Plan Drawings A minimum
of 36 inches of cover over the pipe, unless otherwise shown on the Contract Drawmgs is
required Except for unusual circumstances where approved by the City, the trench sides
shall be excavated vertically and the trench width shall be excavated only to such widths as
are necessary for adequate working space in conformance with WSDOT Section 2-09 4
The trench shall be kept free from water untd Jointing is complete Surface water shall be
diverted so as not to enter the trench The Contractor shall mamtam sufficient pumping
equipment on the �ob to msure that these provisions are carried out Gravel required in the
bottom of the trench due to action of weather or workmen shall be furnished by the
Contractor without expense to the City
, Crry of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
ll1-107
236-1896-113 (01/04)
November 2013
D�ws�on 7
'
7-09 3(19) Connections
7-09 3(19)A Connections to Existing Mains
�...**��
Section 7-09 3(19)A is supplemented with the following
The Contractor shall field verify all existing piping, dimensions, and elevations to ensure
proper fit to any connections being made to existing mains
A representative from the City shall be present for any connection to the City water system
Connections may be made to existing pipes under pressure with the use of a tapping
machine The size and type of pipe must be determined Then the appropriate sized
stainless steel tapping sleeve complete with tapping gate valve may be installed
Where cut-ins are permitted or shown on the plan drawings to be made in existing pipes, the
work shall be conducted at such a time and in such a manner as to mirnmize the interruption
of service The City must approve cut-m time Necessary pipe, fittings and gate valves shall
be assembled at the site ready for installat�on prior to the shutting-off of water in the existmg
main Once the water has been shut off, the work shall be prosecuted vigorously and shall
not be halted until the line is restored to service Unless specifically provided for elsewhere
in these specifications, the Contractor shall have the responsibility of giving at least 5 days'
notice to the City Inspector of intention to disrupt service
7-09.3(21) Concrete Thrust Blocking
�**:***�
Section 7-09 3(21) is supplemented with the following
Bends, tees, dead ends, and crosses shall have restramed �oints
Where shown on the plans or where determined by the Engmeer, water mains and
appurtenances prior to hydrostatic testing shall be thrust blocked at fittings with unbalanced
thrust Thrust blocks shall be allowed a minimum of seventy-finro (72) hours curing time prior
to hydrostatic tests
7-09.3(23) Hydrostatic Pressure Test
�*.:.�#�
Section 7-09 3(23) is supplemented with the following
The Contractor, prior to testing and disinfection, shall submit to the Engmeer for his approval
a schedule of events detading methods and procedures to be used in testing and
disinfection of all water mains and appurtenances
Testing pressures shall be in accordance with the followmg schedule
Piae Class Location
52 Entire Pro�ect
C�ry of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
ll1-108
Min. Pressure
250 psi
236-1896-113 (01/04) '
November 2013
Division 7
�
�
��,
'
�
The Contractor wdl install test flanges where valve location or type is not suitable for the
recommended test pressures
To fdl the main for pressure testing, the Contractor shall install a backflow prevention device,
obtained from the City per Section 2-07 1, onto the existing system With this backflow
device, the Contractor wdl be allowed to connect to a hydrant, blowoff, or other
appurtenance of the existmg main, as required to perform the pressure testing
' Hydrostatic pressure testing against closed butterfly or resilient seat/wedge gate valves will
not be permitted The Contractor shall provide and install all temporary blocking, blowoffs,
plugs, caps, and other equipment and labor necessary to conduct these tests
'
'
'
7-09.3(23)A Testing Extensions From Ex�sting Mains
�******�
Section 7-09 3(23)A is supplemented with the following
Dunng construction, new water mains will be kept separated from the existing system A
connection can be made from City water mams to supply water for in�ial filling, pressure testing,
flushing, and disinfection Untd satisfactory flushing, disinfection, and bacteriological samplmg
have been completed, the new water mam must be handled as if d were contaminated
' 7-09.3(24) Disinfection of Water Mains
7-09.3(24)A Flush�ng
�
,
�
1
'
'
'
�.****.�
Section 7-09 3(24)A �s supplemented with the following
The Contractor shall neutralize heavily chlorinated water prior to disposal Chlorine residual
of water bemg disposed wdl be neutralized by treating with one of the chemicals listed in the
table below
Pounds of Chemicals Required to Neutralize Var�ous Residual Chlor�ne
Concentrations in 100,000 Gallons of Water*
Residual
Chlonne Sulfur Sodwm Sodium Sodium
Concentration Dioxide Bisulfate Sulfate Thiosulfate Ascorbic Ac�d
1 08 12 14
2 17 25 29
10 83 125 146
50 41 7 62 6 73 0
12 22
24 44
120 220
60 0 110 1
*Except for residual chlorine concentration, all amounts are in pounds
To fill the main for flushing the Contractor shall provide and install a backflow prevention
' device (approved by the Engineer) onto the existing system With this backflow device, the
Contractor will be allowed to connect to a hydrant, blowoff, or other appurtenance of the
existing main, as required to perForm the flushing
� C�ty of Bremerton 236-1896-113 (01/04)
Washington Avenue Sewer lmprovements Il1-109 November 2013
Contract Documents D�v�s�on 7
❑
�
The Contractor shall be responsible for providing and installing temporary fittings and
appurtenances to provide a main flushing velocity of 2 5 feet per second
The Contractor shall not use flushing in lieu of disinfection to remedy faded disinfection
tests If, in the Engineer's opirnon, flushing is excessive, charges may be levied agamst the
Contractor These charges wdl be based on the City's commercial rates
Clearing the Main of Heavily Chlorinated Water
After the applicable retention period, heavdy chlorinated water should not remain in
prolonged contact with pipe In order to prevent damage to the pipe lirnng or corrosion
damage to the pipe itself, the heavdy chlorinated water shall be flushed from the main untd
chlorine measurements show that the concentration in the water leaving the main is no
higher than that generally prevailing in the system or is acceptable for domestic use
7-09 3(24)N Final Flushing and Testing
�**.*:.�
Replace the last sentence of the third paragraph of Section 7-09 3(24)N with the followmg
All water lines and appurtenances shall be dismfected and pressure tested at the Contractor's
expense in accordance w�th AVWVA C601-68 and D105-80, Section 711 3 of these
Specifications, and requirements of DOH Dismfected lines shall be flushed with water from the
City's system and samples collected by Crty personnel from all mains for bactenological testmg
Copies of the test results wdl be retained by the City If test results are not satisfactory, lines wdl
again be disinfected, flushed and tested, noting the requirements of Section 1-05 6, untd
finro consecutive satisfactory series of samples are obtained Bactenological testing must satisfy
DOH cnteria pnor to acceptance and utdization of new water facdities
The Contractor shall notify the City 48 hours in advance of required sampling so that
arrangements may be made
7-09.4 Nieasurement
�****.*�
Section 7-09 4 is supplemented with the following
Measurement for "D I Pipe (Restrained Joint) for Water Main,
linear foot
7-09.5 Payment
�*.*.**�
Section 7-09 5 is supplemented with the following
'
1
'
1
'
,�
�
�
�
�
�
In Diam " shall be per
�
'
"D I Pipe (Restrained Joint) for Water Main, _ In Diam " per linear foot
The urnt contract price per linear foot for each size and kmd of "D I Pipe (Restrained Joint)
for Water Main, In Diam ", shall be full pay for all work to complete the installat�on of the
water mam including, but not limited to, saw cutting, removal of existmg improvements
regardless of material, trench dewatering, trench excavation, including any haul or disposal,
laying and �omting pipe, ethylene vinyl acetate pad locator wire, fittings, connecting to
existing mains, �oint restraints, bedding, backfilling with crushed surfacing top course,
concrete thrust blockmg, testing, flushing the pipeline, and cleanup
C�ty of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
ll1-110
,
'
�
236-1896-113(O1/04) �
November 2013
D�v�sion 7
�
�
�
7-12
' 7-12.2
VALVES FOR WATER MAINS
Materials
�:****.�
' Section 7-12 2 is supplemented by adding the following
System valves 2 inches to 10 mches shall be gate valves and shall be resdient wedge non-
' nsing stem (NRS) with finro internal O-rmg stem seals Valve ends shall be mecharncal �oint or
ANSI flanges Valves shall conform to AVWVA 509 or C515 Gate valves shall be Mueller,
MBH, Kennedy, Clow R/W, or Waterous Series 500 Gate valves smaller than 2 inches shall
' be all U S Brass only and shall be manufactured by Mueller, Ford, McDonald, Jones,
Jenkins, or equal
Valve Marker Post Valve marker post shall be equal to Fog Tite Meter Seal Company Paint
' with two coats of Rust-Oleum high gloss white paint Paint distance from the valve marker to
the valve on the post with black enamel pamt Valve marker post to be used for all mainline
valves outside paved areas
�I
�
'
L_J
,
�
�
�
�
�
2-In Blow-off Assembly shall be as specified on the City Standard Detail No 5201
1-In Air and Vacuum Release Valve Assembly shall be as specified on the City Standard
Detail No 6128
7-12.3 Construction Requirements
�.*****�
Section 7-12 3 is supplemented by adding the followmg
Iron piping and fittings shall be galvanized Location of the air release valves as shown on
the Plans is approximate The mstallation shall be set at the high point of the line Water line
must be constructed so the air release valve may be installed in a convenient location
The galvanized iron pipe, valves and fittings shall be threaded Jomts shall be made up in
accordance with good plumbing practice Threads shall be coated with Teflon paste before
connecting
Gate valves shall be set m the ground vertically and shall be opened and shut under
pressure to check operation and, at the same time, show no leakage
Valve boxes shall be installed vertically and shall set flush in pavement and in gravel roads
In other areas the tops shall be set 1 inch above ground The lid is to be installed with the lid
tabs pointmg in the direction of the water main
7-12.4 Measurement
�*.�***�
Section 7-12 4 is supplemented by adding the following
Measurement for "2 In Blowoff Assembly" will be per each
' C�ry of Bremerion
Wash�ngton Avenue Sewer lmprovements
Contract Documents
ll1-111
236-1896-113 (01/04)
November 2013
D�ws�on 7
'
"1 in Air and Vacuum Release Valve Assembly" shall be measured per each and include
the entire length of the assembly from the connection to the LPS to the air release structure
7-12.5 Payment
�**:.::*�
Section 7-12 5 is supplemented with the following
No measurement for payment shall be made for gate valves included in water and sewer
assembly bid items This includes the gate valve in the hydrant assemblies
"2 In Blowoff Assembly", per each
The unit contract price shall be full pay for all equipment, labor, and materials required to
furnish and install the valve assembly complete m place including, but not limited to,
connection to main, disinfecting, valve box, vault, blocking, trench backfill, excavation, pipe
bedding, ad�ustment to final grade, testing, and all associated fittings
"1 In Air and Vacuum Release Valve Assembly", per each
The unit contract price shall be full pay for all equipment, labor, and materiais required to
furnish and install the valve assembly complete in place including, but not limited to,
excavating, backfilling, laymg and �ointing pipe, tapping the main, pipe and fittings, gate
valve, odor control module, basin, cover, and cleanup
7-14 HYDRANTS
7-14.2 Materials
�***�:*�
Section 7-14 2 is supplemented with the following
All materials for the new fire hydrant assemblies shall conform to the City Standard Detail
No 5081 Hydrants shall be dry barrel type and conform to ANSI/AVWVA C502 and shall be
equivalent to the M&H 929 or Mueller Centurion Hydrants shall have a minimum 5 25-inch
main valve opening, finro 2 5-inch outlets, and a 5-mch steamer/pumper port, such outlets
and port shall have national standard threads `
The steamer/pumper port shall mclude a 5 25-inch Red Head AWG STORZ adaptor A
setscrew shall be provided through the NST portion of the adaptor Hydrants shall be traffic
type with break flange and stem coupling O-rmg stem seals shall be provided
7-14 3
7-14.3(1)
Construction Requirements
Setting Hydrants
�****#*�
Section 7-14 3(1) is supplemented with the following
Fire hydrants shall be set as shown m the Standard Details with a 3-foot level area around
the hydrant The tee on the main line shall have a standard thrust block Hydrants above
C�ty of Bremerton 236-1896-113 (07/04)
Washmgton Avenue Sewer Improvements 111-112 November 2013
Contract Documents D�wsion 7
�
'
'
�
'
,
1
,
�
�,
ground shall be painted with paint equal to Ben�amin Moore & Co Industrial Coatings,
M22 Urethane Alkyd Gloss Enamei, Safety Yellow 15 Tops to be painted according to the
Kitsap County Fire Flow Ordinance
Above 1,500 GPM Safety Blue 35
The Contractor shall cover the fire hydrant with a plastic garbage bag until approved for
service by the City Fire hydrant guard posts shall be installed around the fire hydrants as
directed by the City
7-14.4 Measurement
�*.***:�
Section 7-14 4 is supplemented with the following
"Hydrant Assembly", shall be measured per each
No separate measurement for payment will be made for the Class 52 ductde iron pipe for
water mam 6-inch diameter, hydrant auxdiary valve and assoc�ated thrust blocking and �oint
restraint No measurement will be made for excavation, bedding, or backfill
7-14.5 Payment
�****:�*�
Section 7-14 5 is replaced with the following
"Hydrant Assembiy", per each
' The unit contract price per each for "Hydrant Assembly" shall be full pay for all work to remove
and salvage where indicated on the Drawings or dispose of at a Contractor-selected site existing
hydrant, furrnsh and install fire hydrant assemblies, includmg all costs for excavation, backfill
� with crushed surfacing top course, Class 52 ductde iron pipe for water main 6 in diam , auxiliary
gate valve, Storz coupling, concrete blocks, gravel, pamting, testing, and disinfection
required for the complete installation of the hydrant assembly as specified by the City
' 7-15
7-15.1
'
�I
'
,
SERVICE CONNECTIONS
Description
�*.*�*:�
Section 7-15 1 is supplemented w�th the followmg
This work shall include construction of water service connections and stubs conformmg to
the City Standard Details 5001 and 5002 and as modified in the Contract Plan Drawings
The work involves connecting to the main and installing service Imes The Contractor shall
connect the new water service line to an existing angle meter valve No splrces of any kind
will be allowed in the service line between the water main and the angle meter valve The
service line must be one continuous piece
' C�ty of Bremerton
Washing[on Avenue Sewer lmprovements
Contract Documents
ll1-113
236-1896-113 (01/04)
November 2013
D�wsron 7
1
7-15.2 Materials
�***:##�
Section 7-15 2 is supplemented with the following
Service connection materials shall be as specified on the City Standard Details 5001 and
5002
7-15.3 Construction Requirements
�**.:#*�
Supplement Section 7-15 3 with the following
Replace all existing water services with new services in accordance with the water detads in
the Plans The location of existing water meter boxes are shown on the Plans
Where the current service line is 1-mch or smaller, the new service line shall be 1-mch
Where the current service line is 1-1/2-inch or 2-inch, the new service line shall be 2-inch
Provide and mstall fittings m the meter box per the standard detad to transition to the meter
and private service line Some private service lines may be galvarnzed steel
New service lines shall be contmuous with no couplings from the main to the meter
Install additional water services as directed by the City, to be paid at the unit bid item cost
The water service outage to mstail the new service pipe service line shall be coordinated
with the pnvate property owner to mmimize the impact to the resident/business For
residents, coordmate the outage to occur dunng low water usage hours, such as during the
middle of the day For businesses, coordinate the outage to occur during hours when the
business is closed or impact is mirnmized Outages shall not exceed 4 hours The
residentJbusiness and City staff shali be notified mmimum 24 to 48 hours prior to the outage
Table 7-1 lists the known water meters to receive new service pipes including address,
meter size, and name of payer
C�ry of Bremenon
Washmgton Avenue Sewer Improvements
Con[ract Documen[s
111-114
236-1896-113 (Ol/04) '
November 2013
D�ws�on 7
'
'
'
'
'
'
'
'
�
,
,
'
'
'
'
'
'
�
Table 7-1 Water Serv�ce Line Summa Table
Service Address Meter S�ze Owner Name
916 3/4" or 5/8" Adams, Katherme & Michael
912 3/4" or 5/8" Meckstroth, Charles
902 3/4" or 5/8" NJ Naylor Investments #10
Highland Ave
1129 3/4" or 5/8" Masu, Rawan
1127 3/4" or 5/8" Wood, Cornelia
1126 1" Highland Ave Partnership
1123 3/4" or 5/8" Lee, Norman
1121 3/4" or 5/8" Unknown
1120 3/4" or 5/8" Forester, William & Rita
1116 3/4" or 5/8" Laurie, Anna
1109 3/4" or 5/8" Napierkowski, Joyce
1110 3/4" or 5/8" Amy Burnett & Earl Sande
1108 3/4" or 5/8" Monterey LLC
1102 3/4" or 5/8" Monterey LLC
958 3/4" or 5/8" Linder, Darrin & Laura
951 3/4" or 5/8" Supit, Hans & Peggy
952 1" Weber, James L
11th St Place
304*** — —
114 3/4" or 5/8" Monterey LLC
110 3/4" or 5/8" Monterey LLC
13th St
301 — —
Park Ave
1318 3/4" or 5/8" Seaside Church
1400 2" Parks Department Evergreen Park
1400 1 5" Parks Department Evergreen Park
Sheldon Blvd
510 1 5" Parks Department Evergreen Park
512 2" � Parks Department Evergreen Park
1217 3/4" or 5/8" Park Place Development LLC
McKenzie
1223 3/4" or 5/8" Cruver, Kyle & Cynthia
7-15.3(1) Fiushing and D�sinfection
�**.:.:#�
Replace Section 7-15 3(1) with the followmg
All service pipe and appurtenances shall be disinfected prior to connection to the existing
meter Service lines may be connected to the water main prior to water main disinfection
and disinfected with the water main In this case, angle meter valves shall be mstalled on
1 City of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
ll1-115
236-1896-113 (Ol/04)
November 2013
D�v�s�on 7
,
the ends of the service lines prior to disinfection and the lines shall be flushed after filling of
the main to ensure the service lines are filled with chlorinated water After the main passes
bacteriological testing and prior to connection to the meters, the service lines shall be
flushed to remove chlorinated water
If service lines are connected to the water main after disinfection and testing of the main, all
service pipe and appurtenances shall be prechlonnated prior to installation After installation,
the service connection shall be flushed prior to connecting to the meter
7-15.4 Measurement
�*::..:�
Section 7-15 4 is supplemented with the following
"Single Service Connection _ In Diam ", shall be measured per each
No separate measurement for payment will be made for trench excavation, pipe bedding,
trench backfill, compaction, and ad�usting meter boxes to grade
7-15.5 Payment
�*.«..:�
Section 7-15 5 is supplemented with the followmg
"Single Service Connection _ In Diam ", per each
The unit contract price for "Single Service Connection _ In Diam " shall be full pay for all
the work, materials, and labor to replace water service as shown on the Plans, including but
not limited to, excavating, trench backfill, pipe beddmg, compaction, tapping the main,
connecting to the existing angle meter valve, laying the pipe, moling or pipe bursting pipe,
resetting the meter box, and any appurtenances required to make connections The meter
box must be ad�usted to grade
No payment shall be made for service lines with splices befinreen the water main and the
angle meter valve The service line must contam one continuous piece
7-17 SANITARY SEWERS,
7-17.1 Description
�*,�.:.*�
Replace Section 7-17 1 with the following
This work consists of constructing sanitary sewer lines m accordance with the Plans, these
Specifications, the Standard Plans, and City of Bremerton standards
C�ry of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documents
ll1-116
236-1896-113 (01/04) �
November 2013
D�vis�on 7
�
�
� 7-17.2 M i
ater als
�
'
lI
,
'
II
�'
,
,
��...���
Section 7-17 2 is supplemented with the following
Gravity sarntary sewer pipe shall be ASTM D3034 SDR 35 PVC meetmg the requirements of
Section 9-30 1(5)A or high density polyethylene meetmg the requirements of
Section 9-05 23 of the Standard Specifications
Contractor shall inspect and measure the interior ends of all individual PE gravity sewer pipe
sections prior to mstallation to determine if the interior pipe diameter meets the
manufacturer's specified dimensions Contractor shall cut pipe end to lengths that don't
meet the manufacturer's specifications and discard No payment wdl be made for these
wasted pipe end sections
Low pressure sewer piping and materials shall be as specified m Section 9-05 23 for high-
density polyethylene pipe
7-17.3
7-17.3(1)
Construction Requirements
Protection of Existing Sewerage Facilities
�:*:�:*:.�
Add the following new subsections to Section 7-17 3(1)
7-17.3(1)A Maintaining Sewer Service (NEW SECTION)
The Contractor shall be responsible for bypass pumping or otherwise maintaining sanitary
sewage flows No discharge of sanitary sewage to the storm drain system or environment
shall be allowed
sy
The Contractor shall submit proposed plans for mamtaming sewage flow The plan shall
' mdicate the method of maintairnng service, the duration of the bypass if used, who the
Contractor has designated to be responsible for the bypassing, and the redundancy
provided for the bypassing Systems shall be designed to handle up to 200 gpm
,
'
'
'
,
'
7-17 3(1)B Maintain�ng Sewer Service of Laterals (NEW SECTION)
The Contractor shall contact individual property owners to coordinate suspension of sewage
flows during construction if required
��.*.���
Add the following new section
7-17.3(4) Low Pressure Sewer Valves (NEW SECTION)
Isolation Valves
All valves on low pressure sewer laterals up to 2 inches shall be PVC Schedule 80 threaded
ball valves
C�ty of Bremerton 236-1896-113 (01/04)
Washmgton Avenue Sewer lmprovements ll1-117 November 2013
Contract Documents D�vis�on 7
,
All valves up to 2-inches on low pressure sewer mains shall be bronze FIPT X FIPT ball
valves with appropriate couplings All valves greater than 2 inches on low pressure sewer
mains shall be resilient seat wedge gate valves
Air and Vacuum Release Valves
Piping and fittings shall be brass Air and vacuum release valves shall be Crispin US10B, or
approved equal, with 1/4-mch operating orifice and operating range of 20 to 150 psi Air
release valves and air/vacuum valves shall be located at the high points of the line Air
release valves shall be fitted with Calgon SweetVent Odor Control Module (slip-on model) or
approved equal
Valves shall be located m non-vehicular traffic area
Air release assembly shall be per COB Standard Detad #6128
�***.**�
Add the following new section
7-17.3(3) Slip-Lining (NEW SECTION)
General
installation of the new 8-inch water main along Washington Avenue and all water services
shall be complete and in service prior to start of the work All proposed construction
methods and materials shall be approved by the Engineer before the start of construction
Slip-Lining Details Required
Submit details of the following to the Engineer for approval before beginning the slip-linmg
construction
1 Piping, fittings, and service saddles
2 Method of slip-lining, including listed equipment by size, make, model, and
manufacturer
3 Construction plan for access and pulling pits
4 A substitute design for any part of the system that must be changed as a result of the
slip-linmg operation
5 Method for cutting the abandoned 8-inch cast iron water mam for accessing the
4-inch sewer pipe
6 Any structure that is required because of the particular method or procedure used by
the Contractor
Cleaning and Video Inspection
Contractor shall clean and video mspect the 8-inch cast iron pipe in accordance with
Section 7-17 3(2) to document existing condition and confirm the 4-inch PE sewer pipe can
be installed without damaging or compromising the integnty of the 4-mch pipe Notify
Engineer of any obstructions or conditions of the existing cast iron pipe that may prevent
C�ty of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer Improvements ll1-118 November 2013
Contract Documents D�vis�on 7
,
'
'
construction operations and provide recommendations of corrective action Additional
cleaning or other work necessary to prepare the cast iron pipe shall be reimbursed through
Force Account
Access and Pulling Pits
' Locate all pits as shown on the Plans, unless otherwise approved by the Engineer Provide
necessary shoring and traffic control measures during excavation and slip-lining
construction work
'
�
�
,
Pipe Join�ng
PE pipe and pipe �oirnng method shall be per WSDOT Section 9-05 23
Slip-Linmg
Slip-Immg shall be accomplished by pullmg or pushing PE pipe into the abandoned water
main by use of inechanical or hydraulic equipment Do not score or damage the PE pipe
during the installation process Once in place, PE pipe shall be allowed to stabdize for at
least 12 hours before making any connections Annular space between PE pipe and existing
pipe shall be filled with grout
Pressure test PE pipe per WSDOT Section 7-09 3(23) Test pressure shall be 50 psi
Connect all service Imes after test has been performed and accepted by the Engineer
' 7-17 4 Measurement
��
'
'
�
'
�***.**�
Section 7-17 4 is supplemented with the following
"PVC Sanitary Sewer Pipe 8 In Diam ", "C900 PVC Sanitary Sewer Pipe 8 In Diam ", and
"PE Sewer Pipe _ In Diam ", and "PE LPS Main 4 In Diam " shall be measured per Imear
foot along the centerlme of the pipe through fittings and structures
"Slip-Lining, 4 In Diam " shall be measured per linear foot along the centerline of the pipe
through fittings and structures
7-17.5 Payment
�.*****�
Section 7-17 5 is supplemented with the following
"PVC Sanitary Sewer Pipe 8 In Diam ", per linear foot
The unit contract price for "PVC Sanitary Sewer Pipe 8 In Diam " shall be full pay for all
' work and materials necessary to furnish, haul, and assemble in place the complete pipe
installation includmg trench excavation and dewatering, laying and �ointing pipe and fittmgs,
placing and compacting pipe bedding and crushed surfacing top course trench backfdl
' materials, marking tape, pressure testing, removal, haul, and disposal of excavated material,
and cleaning
'
"C900 PVC Sanitary Sewer Pipe 8 In Diam ", per Imear foot
' City of Bremerton
Wash►ngton Avenue Sewer Improvements
Cont�act Documents
ll1-119
236-1896-113(O1/04)
November 2013
D�v�sion 7
'
The unit contract price for "C900 PVC Sanitary Sewer Pipe 8 In Diam " shall be full pay for
all work and materials necessary to furnish, haul, and assemble in place the complete pipe
installation includmg trench excavation and dewatering, laying and �ointing pipe and fittings,
placing and compacting pipe beddmg and crushed surfacmg top course trench backfdl
materials, marking tape, pressure testmg, removal, haul, and disposal of excavated material,
and cleaning
"PE Sanitary Sewer Pipe _ In Diam ", per linear foot
The unit contract price for "PE Sanitary Sewer Pipe _ In Diam " shall be full pay for all work
and materials necessary to furrnsh, haul, and assemble in place the complete pipe
installation including trench excavation and dewatering, laying and �ointing pipe and fittings,
placing and compacting pipe bedding and crushed surfacing top course trench backfill
materials, pressure testing, removal, haul, and disposal of excavated material, and cleaning
and video inspection The unit price shall include the cement concrete, rebar and welded
wire remforcement, spacers, plastic sheeting, and filling of pipe with water for construction of
the shallow sewer trench Payment for the geogrid fabric shall be per Section 2-12
"PE LPS Main 4 In Diam ", per linear foot
The urnt contract price for "PE LPS Mam 4 In Diam " shall be full pay for all work and
materials necessary to furrnsh, haul, and assemble in place the complete pipe installation
including laymg and �ointmg pipe and fittings, trench excavation, placing and compacting
bedding and crushed surfacing top course matenals, pressure testing, tornng wire, and
marking tape, and connection to sewer manholes The unit price shall also include removal,
haul, and disposal of excavated material
"Slip-Lirnng, 4 in Diam ", per linear foot
The unit contract price for "Slip-Lming, 4 In Diam " shall be full pay for all work and materials
necessary to furnish, haul, and assemble in place the complete pipe installation includmg
construction installation plan, cleanmg and video inspection of 8-inch cast iron carrier pipe
(abandoned water main), Jointing pipe and fittings, excavation, shoring, and backfdling
access and pulling pits, slip-Immg of pipe, excavation and backfill of serwce pits, cutting of
cast iron pipe, tornng wire, concrete groutmg of pipe carner pipe, pressure testmg, and
cleaning The urnt price shall also include temporary shoring and erosion control, and
removal, haul, and disposal of excavated material
7-18 SIDE SEWERS
7-18.1 Description
�.*.:*.�
Section 7-18 1 is supplemented with the following
This work consists of installing gravity and low-pressure sewer laterals
C�ry of Breme►ton
Wash�ngton Avenue Sewer Improvements
Contract Documents
ll1-120
236-1896-113 (01/04) �
November 2013 �
D�ws►on 7 �
,
n
'I
�I
, 7-18.2 Materials
, �***�.*�
Section 7-18 2 is supplemented with the following
' Gravity sanitary sewer lateral pipe shall be ASTM D3034 SDR 35 PVC meeting the
requirements of Section 9-30 1(5)A or high density polyethylene meeting the requirements
of Section 9-05 23 of the Standard Specifications
'
�
,
�
Low pressure sewer lateral piping and materials shall be as specified in Section 9-05 23 for
high-density polyethylene pipe
7-18.3 Construction Requirements
�.**..*�
Section 7-18 3 is supplemented with the following
Gravity sarntary sewer laterals shall be constructed per City of Bremerton Standard
Detad 6040
Low pressure sanitary sewer laterals shall be constructed per City of Bremerton Standard
Detads 6041 and 6042
, 7-18.4 Measurement
,
�
'
'
'
�
�**..**�
Section 7-18 4 is supplemented with the following
"PVC Sarntary Sewer Lateral Pipe _ In Diam ", "PE Sarntary Sewer Lateral Pipe 6 In Diam ",
and "PE LPS Lateral Pipe 1-1/4 In Diam " shall be measured per linear foot along the
centerline of the pipe through all fittings '
No separate measurement for payment will be made for trench excavation, pipe bedding,
trench backfill, and compaction
"Single LPS Lateral Service Connection 1-1/4 In Diam ", per each
No separate measurement for payment will be made for trench excavation, pipe bedding,
trench backfill, compaction, and constructing the collection valve box cleanout
7-18.5 Payment
�*��***�
Section 7-18 5 is supplemented with the following
"PVC Sanitary Sewer Lateral Pipe _ In Diam ", per linear foot
' The unit contract pnce for "PVC Sanitary Sewer Lateral Pipe _ In Diam " shall be full pay
for all work and materials necessary to furnish, haul, and assemble m place the complete
pipe installation including trench excavation and dewatenng, laying and �ointing pipe and
fittings, cutting and connecting to existing sewer pipe lateral with flexible fittings, placing and
' compacting pipe bedding and crushed surfacing top course trench backfill materials,
marking tape, air testing, removal, haul, and disposal of excavated material, and cleaning
' Ciry of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
ll1-121
236-1896-113 (Ol/04)
November 2013
Div�s�on 7
'
"PE Sanitary Sewer Lateral Pipe 6 In Diam ", per linear foot
The unit contract price for "PE Sanitary Sewer Lateral Pipe 6 In Diam " shall be full pay for
all work and materials necessary to furnish, haul, and assemble in place the complete pipe
installation including trench excavation and dewatering, laying and �ointmg pipe and fittings,
placing and compacting pipe beddmg and crushed surFacing top course trench backfdl
materials, markmg tape and locating wire, air testing, removal, haul, and disposal of
excavated material, and cleaning The urnt price shall include the cement concrete, rebar
and welded wire reinforcement, spacers, plastic sheeting, and fdling of pipe with water for
construction of the shallow sewer trench Payment for the geogrid fabric shall be per
Section 2-12
"Single LPS Lateral Service Connection 1-1/4 In Diam ", per each
The urnt contract price for "Single LPS Lateral Service Connection 1-1/4 In Diam " shall be
full pay for all the work, materials, and labor to construct a new LPS service as shown on the
Plans, including but not limited to, excavating, laying the pipe or installing usmg trenchless
technology techniques, connectmg to the main, pipe bedding, trench backfill, compaction,
installation of the collection valve box cleanout, and any appurtenances required to make
the connection The valve box must be ad�usted to grade Lateral service to the individual
grinder pump stations shall be paid under bid item "PE LPS Lateral 1-1/4 In Diam "
"PE LPS Lateral 1-1/4 In Diam ", per linear foot
The unit contract price for "PE LPS Lateral 1-1/4 In Diam " shall be full pay for all work and
materials necessary to furnish, haul, and assemble m place the complete pipe installation
mcluding trench excavation, horizontal directional drilling techniques, laying and �omting pipe
and fittings, backfilling with native material, tonmg wire, testmg, cleaning, and mstallation of
appurtenances required to make the connections
7-19 SEWER CLEANOUTS
7-19.2 Materoals
�*.*.*.�
Section 7-19 2 is supplemented with the following
All materials for the new sewer cleanouts shall conform to the City of Bremerton Standard
Detads
7-19.3 Construction Requirements
�***...�
Section 7-19 3 is supplemented with the following
Low pressure sewer lateral cleanout shall be per City of Bremerton Standard Detail 6120
where a low pressure sewer lateral is dischargmg to a low pressure sewer main
Gravity sanitary sewer cleanouts shall be constructed per City of Bremerton Standard
Detad 6025
C�ty of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer Improvements ll1-122 November 2013
Contract Documents D�v�s�on 7
�
'
7-19 4 Measurement
�
'
�l
�::*.**�
Section 7-19 4 is supplemented with the following
Measurement for "LPS Mam End-of-Run Cleanout 4 In Diam " will be measured per each
Measurement for "PVC Gravity Main Sewer Cleanout 8 In Diam " wdl be measured per
each
7-19.5 Payment
' �.**#*.�
Section 7-19 5 is supplemented with the following
, No specific payment for LPS lateral cleanouts wdl be made All costs incurred for this
construction item shall be included in the bid item for "Smgle LPS Lateral Service
Connection 1-1/4 In Diam "
,
"LPS Mam End-of-Run Cleanout 4 In Diam ", per each
The unit price in the Proposal for "LPS Main End-of-Run Cleanout 4 In Diam " shall be full
' compensation for all labor, equipment, materials, and tools necessary or incidental to
construct a low pressure cleanout, complete This work includes, but is not limited to,
excavation, pre-cast concrete vault and lid, laying and �ointing pipe and fittings, 4-inch gate
, valve and valve box, pipe bedding, trench backfdl, compaction, toning wire, testing, and
clearnng
,
C J
�i
'u
��
'
,
�
"PVC Gravity Main Sewer Cleanout 8 In Diam "
The unit contract price for gravity sewer cleanout shall be full pay for all work, materials,
labor, and equipment necessary or incidental to install main line sewer cleanout, complete
This work mcludes, but is not limited to, excavating, trench backfill, pipe beddmg,
compaction, laying and Jointing the pipe, toning wire, testing, clearnng, installation of
appurtenances required to make connections, concrete collar, cast iron rmg, and cover and
shali be considered mcidental, and no additional compensation will be made
' City of Bremerton
Washington Avenue Sewer Improvements
Convact Documents
111-123
236-1896-113 (Ol/04)
November 2013
D�vis�on 7
�-
�
�.*#***�
Add the following new section
7-22 GRINDER PUMP ASSEMBLIES (NEW SECTION)
7-22.1 Description
This work consists of installing E-One Grinder Pump assemblies as shown on the Plans
7-22.2 Materials
Materials for grinder pump assemblies and appurtenances shall be in conformance with the
C�ty of Bremerton Eng�neermg Des►gn and Construct�on Standards for San�tary Sewer
7-22 3 Construction Requirements
7-22.3(1) General
Grinder pumps shall be installed per City of Bremerton Standard Detads 6101, 6102, 6103,
and 6104
7-22.3(2) Installation Standards
The grinder pump shall be an Environment One Model as supplied by Correct Equipment,
Inc
Contact the City for a pre-construction meeting to review pump tank and control panel
locations before any installation Contractor shall determine the depth of the existing budding
sewer discharge before any mstallation
The grinder pump lift station package shall include the following items
1 Sewage grinder pumps, semi-positive displacement type, equal to Environment One
progressive cavity with a 1 HP, 1800 RPM motor
2 Corrugated HDPE tank with single complete pump unit, ready for installation The
tank will have a 1-1/4 NPT discharge connection and a 4-mch inlet grommet for DVW
(Dram Waste and Vent) pipe
3 The tank shall include an internal check valve assembly
4 A breaker panel as supplied by Environment One, with two 15-amp breakers for
pump operations, one 15-amp breaker for the alarm system, a Push-to-Run button,
an audible alarm with Sdence Button, and a red light alarm All wires and connectors
are to be color coded and labeled for ease of installation
5 A minimum of 25 feet of direct bury cable (Supply Cable) befinreen the tank and
breaker panel Maximum length of direct bury cable is 175 feet Contractor shall field
verify required length of cable prior to construction Splicing of cable will void the
E-One warranty and therefore will not be allowed
C�ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements ll1-124 November 2013
Contract Documents D�v�s�on 7
,
�
'
'
'
u
�
,
�I
,
'
,
1
�
I��
U
�
'
6 The grinder pump system operates on finro pressure switches One switch operates
the pump on/off and the second operates the alarm
7 The package system shali meet the requirements of the Washington State
Department of Labor and Industries, Division for Residential, grinder pump systems
8 The electrical supply to the breaker panel shall be 240-volt single-phase power
9 The tank location shall be accessible for maintenance and repair The tank cover
shall be approximately 3 inches above finished grade Finish grade shall slope away
from the station and the station shall not be installed within a"pot hole" No plants
are to be located within 5 feet of the tank and the property owner shall maintain a
3-foot clear zone around the tank
10 The location of the breaker panel shall be
• Accessible for maintenance and repair,
• In sight of the tank,
• The bottom of the panel must be 5 feet from firnshed grade, and
• The alarm light shall be visible from 50 feet and must be visible in a
180-degree radius
11 The maximum distance befinreen the breaker panel and the grinder tank shall be
175 feet, with a clear Ime of sight and easy access �
12 The Breaker Panel shall be equipped with a knife-type lock out switch The lockout
switch shall be visible from the tank
13 Fences, bushes, or any other ob�ect shall not hide the alarm light or hmder in the
maintenance and/or repair of the system
14 There shall be no additional �unction boxes or splices made once the system has
been installed and inspected by City Inspectors Anyone tampering with the
approved system shall be liable to the City for any expense, loss, damage, cost of
inspection, or cost of correction incurred by the City
15 Gnnder pump assemblies shall be installed in accordance with these Specifications
and under the recommendations of the manufacturer
16 The licensed contractor shall be responsible for burying the two (2) direct burial
electrical cables in accordance with the City Standards, codes, and regulations for
the control and alarms of the grinder pump The wires shall be buried at a minimum
depth of finrenty-four (24) inches Wires placed m a rigid, non-metallic conduit shall be
at a mmimum depth of eighteen (18) inches If the wires are placed in a rigid, metal
conduit, the minimum depth shall be six (6) inches The property owner or licensed
contractor shall leave at least finro (2) feet of wires exposed and coiled at the outside
of the grmder pump near the inlet "eyes" into the grinder pump At the structure, the
property owner or licensed contractor shall run the wires in a rigid conduit from
under-ground into the grinder pump control panel on the structure with at least one
(1) foot of extra wire coiled m the control panel
' City of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
ll1-125
236-1896-113 (01/04)
November 2013
D�v�s�on 7
�
17 The grinder pump electrical control panel shall be instailed by the licensed contractor
on the main structure located on tFie same property as the grinder pump The power
for the grinder pump and alarm system shall come from the property owner's
structure A licensed contractor shall connect the power supply of the structure to the
control panel in accordance with State and local codes and in accordance with the
electric utility's regulations
7-22.3(3) Call for Inspection
Arrangements for inspection of a Grinder Pump installation shall be made with the City
24 hours in advance The City reserves the right to set the time for inspections Side sewer
and sewer lateral permits must be obtamed from the City pnor to schedulmg an inspection
All inspections will be perFormed during normal working hours Cancellations must be made
a minimum of one hour before the scheduled appointment Additional inspection may result
in additional fees
7-22.3(4) Test�ng of Final Installation
Side sewers using pump systems shall be tested at 120 psig (twice the pressure rating of
the pump system) Following is the procedure used for testmg the discharge line
a)
b)
c)
d)
e)
Close the m-line ball valve in the grinder pump clean-out valve box
Open the riser ball valve in the grinder pump clean-out valve box
Close the ball valve at the collection valve box for the street connection
Usmg hand pump, pressurize with air
Hold the required pressure for 10 minutes Allowable leakage = 0
Prior to connection of existing residential sewer service to grinder pump assembly and
abandonment of the existing septic system, Contractor shall perform a start-up test of the
grinder pump assembly per the manufacturer's recommendations and rece�ve City approval
on the installation
7-22 3(5) Residence Electrical Panel Upgrade
Contractor shall be reqwred to upgrade the electrical panels at the following residences to
current L&I Standards in order to accommodate construction of the Grinder Pump
Assemblies
1 906 Washmgton Avenue
2 912 Washington Avenue
3
4
5
934 Washington Avenue
940 Washington Avenue
944 Washington Avenue
C�ty of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documents
ll1-126
236-1896-113 (01/04) '
November 2013
D�ws�on 7
I I
�
�
'
�
'
�
'
'
'
i
�
,
Panel upgrade shall be completed by a licensed electrician Contractor shall be responsible
for obtairnng all necessary permits
Power outage at individual residences during panel upgrade shall be limited to 8 hours, total
per residence Contractor shall be responsible for all coordination associated with acquiring
the necessary permits and for schedulmg and completing inspections
7-22.4 Measurement
Measurement for " Grinder Pump Assembly, Complete" will be per each mstalled
7-22.5 Payment
Payment wdl be made in accordance with Section 1-04 1, for the following bid item
Grinder Pump Assembly, Complete", per each
Includes labor, equipment, and materials to provide and mstall a gr�nder pump package and
resident sewer connection, complete Each grmder pump package is to mclude wet well with
simplex submersible grinder pump, power connection to the house service, control panel,
and locate, cut into the sewer drain and sewer drain line from the house to the pump
package, connection to the LPS lateral cleanout, excavation, dewatermg, concrete anti
buoyancy collar, native backfill, and m-kind surtace restoration for the entire site not covered
under other bid items The potholing and other efforts to locate the house drain lines and
power service and service-pipe connections shall be included in this item
This item shall not include the 1-1/4-inch HDPE service pipe from the pump package to the
force main with excavation and restoration
Excavation, bedding, backfill, compaction, testing, and startup shall be considered incidental
to this bid item and no additional compensation will be made
"Electncal Panel Upgrade", by force account as provided in Section 1-09 6
Payment for upgrading the electncal panels at existing residences in order to accommodate
� grinder pump assembly construction wdl be paid by force account in accordance with
Section 1-09 6 To provide a common basis of Bid, the Owner has entered an amount in the
Proposal for "Electrical Panel Upgrade" to become part of the Contractor's total Bid
�i
���
�
�
'
' City of Bremerton
Washington Avenue Sewer Improvements
Convact Documents
END OF DIVISION 7
ll1-127
236-1896-113(O1/04)
November 2013
D�ws�on 7
'
THIS PAGE INTENTIONALLY LEFT BLANK
,
�
C�ty of Bremerton 236-1896-113 (Ol/04)
Washmgton Avenue Sewer Improvements 111-128 November 2013
Contract Documents D�vis►on 7
�
'
�
' 8-01
8-01.3
Any area not covered with established, stable vegetation where no further work is
anticipated for a period of 15 days, shall be immediately stabilized with the approved erosion
and sedimentation control methods (e g, seeding and mulchmg, straw) Where seeding for
temporary erosion control is required, fast germmating grasses shall be applied at an
appropriate rate (e g, perennial rye applied at approximately 80 pounds per acre)
' �*.**.*�
Section 8-01 3 is supplemented with the following
' The Contractor shall bear sole responsibdity for damage to completed portions of the pro�ect
and to property located off the pro�ect caused by erosion, siltation, runoff, or other related
items during the construction of the pro�ect The Contractor shall also bear sole
, responsibdity for any pollution of nvers, streams, groundwater, or other water that may occur
as a result of construction operations
,
;
�
At no time shall more than 1 foot of sediment be aflowed to accumulate within a catch basm
, All catch basins and conveyance lines shall be cleaned at a time designated by the City's
Pro�ect Inspector The cleaning operation shall not flush sediment-laden water into the
downstream system The cleaning shall be conducted using an approved vacuum truck
' capable of �et roddmg the lines The collection and disposal of the sediment shall be the
responsibdity of the Contractor at no cost to the City
�_1
'
8-014 Measurement
�:*****�
Section 8-01 4 is replaced with the following
No specific urnt of ineasurement shall apply to the lump sum item "Erosion/Water Pollution
Control"
' 8-01.5 Payment
'
'
�
'
�#*«�:*�
Section 8-01 5 is replaced with the following
DIVISION 8
MISCELLANEOUS CONSTRUCTION
EROSION CONTROL AND WATER POLLUTION CONTROL
Construction Reqwrements
"Erosion/Water Pollution Control", lump sum
The lump sum contract price for "Erosion/Water Pollution Control" shall constitute full pay for
all labor, materials, tools, and equipment necessary and incidental to the installation,
maintenance, repair, and removal of erosion and sediment control facilities and trench
dewatenng equipment as specified on the Plans and Standard Specifications, as well as all
costs associated with the Contractor's erosion control plan
C�ty of Bremerton 236-1896-173 (Ol/04)
Washington Avenue Sewer Improvements lll-129 November 2013
Contract Documents D�v�s�on 8
'
8-02
8-02.1
ROADSIDE RESTORATION
Description
�:::*#*�
Revise the first paragraph of Section 8-02 1 to read
This Work consists of furrnshmg and placing topsoil, compost, and soil amendments and
furnishmg and planting bare root plants, container plants, balled and burlapped plants,
cuttings, fascmes, live stakes, live poles, rhizomes, tubers, lawn instailation, irrigation
system repair, controlling weeds, performmg plant establishment activities, and soil
bioeng�neering m accordance with these Specifications and as shown in the Plans or as
designated by the Engineer
�**.***�
Section 8-02 1 is supplemented with the following
Seed
Seed mixture for hydroseeding shall conform to the composition specified in the following
paragraph Seeding rates are shown m pounds of pure life seed (PLS) per acre or
1,000 square feet PLS is determined by multiplymg the percent purity (expressed as a
decimal) by the percent germmation (expressed as a decimal) and then multiplying this
factor by the pounds of seed in the mixture (PLS = pounds of seed in mixture times percent
purity times percent germination) The punty and germination percentages shall be as
shown on the tag on each seed contamer
Kmd and Variety of Seed in Mixture
Creepmg Red Fescue
Perennial Rye
Highland Bent
White Dutch Clover
Total
Proaortion by Weiaht
40%
40%
10%
10%
100°�
PLS/Acre
32
32
8
8
80
Seed muctures shall not contam more than 0 5 percent by weight, weed seed shall be free of
prohibited noxious weed, specifically, horsetad, quack grass, and morning glory 8
Additionally, the maximum amount of inert or other seed shall be 2 0 percent by weight
Fertilizer
Total Available Nitrogen
Available Phosphorous
10 percent, of which 50 percent is derived (analyzed as N from
38 percent siow release urea form)
20 percent (analyzed as P205)
Avadable Potassium 20 percent (analyzed as K20)
Note Above percentages are proport�oned by weight
Mulch
Mulch for hydroseeding shall be wood cellulose fiber and shall be applied to all seeded
areas on this pro�ect Bark mulch shall be bark or wood chips per Section 9-14 4(3)
City of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer lmprovements ll1-130 November 2013
Contract Documents D�v�s�on 8
��
,
'
'
�
�
'
, 8-02.3 Construction Re uirements
9
,
'
�****:.*�
Section 8-02 3 is supplemented with the following
All grass areas disturbed by construction shall be hydroseeded, unless otherwise directed
by the Owner's Representative
The Contractor is responsible for applying water to all seeded areas until 4 weeks after
' substantial completion or until the seeded areas have a dense growth of grass with an
average height of 1 inch The Contractor shall take necessary measures to prevent siltation
of downstream facilities and ad�acent properties
�
The Contractor is responsible for coordinating the repair and relocation of the existing
irrigation system with Bremerton Parks and Recreation
' 8-02.4 Measurement
�******�
' Section 8-01 4 is replaced with the following
No specific unit of ineasurement shall apply to the lump sum item "Landscape Repair"
' 8-02.5 Payment
,
�***�*:�
Section 8-02 5 is supplemented with the following
"Landscape Repair", per lump sum
'
C
'
'
�
'
'
The lump sum contract price for "Landscape Repair" shall constitute full pay for all labor,
materials, tools, and equipment necessary and incidental for the restoration of landscape
features damaged and/or disturbed during construction on private properties and Evergreen
Park SurFace restoration shall be as specified on the Plans and Standard Specifications,
and shall also include the replacement of all irrigation system components in Evergreen
Park and coordination with Bremerton Parks and Recreation Work under this bid item shall
also include restoration of all landscape features on prrvate properties outside of the public
right-of-way, such as lawns, rockeries, concrete walls, sidewalks, driveways, brick
walkways, fences, and other landscape features
Payment for specialty landscape restoration completed per the direction of the City shall be
paid by force account in accordance with Section 1-09 6
' C�ty of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documen[s
ll1-131
236-1896-113 (Ol/04)
November 2013
D�v�sion 8
1
8-04 CURB, GUTTERS, AND SPILLWAYS
8-04.3 Construct�on Requirements
8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways
�****.*�
Section 8-04 3(1) is supplemented with the following
"Cement Conc Curb and Gutter Type A" shall be constructed per City of Bremerton
Standard Detad 3131
"Cement Conc Curb Type C-1" shall be constructed per City of Bremerton Standard
Detad 3133
8-04.5 Payment
�***�*.�
Section 8-04 5 is supplemented with the following
"Cement Conc Curb and Gutter Type A", per linear foot
"Cement Conc Curb Type C-1 ", per linear foot
8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES
8-06.1 Description
�*:..�*�
Section 8-06 1 is supplemented with the following
Cement Conc Dnveway Approach, Type III shall be constructed per City of Bremerton
Standard Detad 3121
8-06.4 Measurement
��*f.:*�
Section 8-06 4 is supplemented with the following
Measurement for "Cement Conc Driveway Approach, Type III" wdl be per square yard
8-06.5 Payment
�*****.�
Section 8-06 5 is supplemented with the followmg
"Cement Conc Driveway Approach, Type III" wdl be per square yard
C�ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer ►mprovements ll1-132 November 2013
Con[ract Documents D�ws�on 8
'
1
'
�
,
�
�
C J
'
,
'
'
'
�
�
,
LJ
'
8-13 MONUMENT CASES
8-131 Description
��...**�
Replace Section 8-13 1 with the following
This work shall consist of furnishmg and plac�ng monuments, monument cases, and covers
in accordance with the Standard Plans and these Specifications, in conformity with the lines
and locations shown in the Plans or as staked by the Engineer
8-13.2 Materials -
�***.**�
Section 8-13 2 is supplemented with the following
Monument frame and cover, including precast concrete monument shall be per City of
Bremerton Standard Details 3401, 3402, and 3403
8-13.3 Construction Requirements
�******�
Section 8-13 3 is supplemented with the following
Construct monument per City of Bremerton Standard Details 3403
8-13 4 Measurement
�.*.*..�
Section 8-93 4 is deleted and replaced by the following
Measurement of monument case, cover, and precast concrete monument will be by the unit
for each monument case, cover, and precast concrete monument furrnshed and set
8-13.5 Payment
�**:***�
Section 8-13 5 is supplemented with the following
"Survey Monument", per each
City of Bremerton 236-1896-113 (O7/04)
Washington Avenue Sewer Improvements ll1-133 November 2013
Contract Documents Diwsion 8
,
8-22 PAVEMENT MARKING
8-22.1 Description
�*#.**:�
Section 8-22 1 is supplemented with the following
Contractor wdl be responsible for reestablishing permanent pavement markings disturbed
during construction, includmg rpms Rpms shall be included in the unit price for Pamt Line
and Plastic Line
Painted Line and Plastic Stop Line shall be constructed per City of Bremerton Standard
Deta�l 3265
Plastic Crosswalk Lme shall be constructed per City of Bremerton Standard Detail 3257
Painted Traffic Arrow shall be constructed per City of Bremerton Standard Detail 3267
8-22.4 Measurement
�...:�#:�
Section 8-22 4 is supplemented with the following
No specific unit of ineasure shall apply to the lump sum item "Pavement Marking"
8-22.5 Payment
�***..*�
Section 8-06 5 is supplemented with the following
"Pavement Marking", per lump sum
The lump sum contract price for "Pavement Marking" shall be full compensation for all labor,
materials, tools and equipment necessary and incidental to the mstallation, mamtenance,
repair, and removal of pavement markings as specified on the Plans and Standard
Specifications, as well as all Contractor's costs associated with coordination with Bremerton
Parks and Recreation
END OF DIVISION 8
C�ty of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
ll1-134
236-1896-113 (Ol/04) �
November 2013
D�ws�on 8
�
'
,
,
, 9-05
9-05.23
'
'
'
'
�
t
'
'
'
'
�
,
,
'
DIVISION 9
MATERIALS
DRAINAGE STRUCTURES, CULVERTS, AND CONDUITS
High-Density Polyethylene (HDPE) Pipe
�*#*�*��
Revise the first and second paragraph of Section 9-05 23 as follows
Pipe materiais shall be high-density polyethylene PE4710 conforming to a mmimum cell
classification of PE 445574C per ASTM 3350
Unless noted otherwise, all HDPE pipe sizes are based on Iron P�pe Size (OD-!PS) The
dimension ratio (DR) for all HDPE pipe shall be as follows
Low Pressure Sewer Service Laterals SDR 11
Pressure Pipe for Low Pressure Sewer Mains SDR 11
Gravity Pipe for Sewer Mains SDR 11
HDPE fittmgs, where called for use on the pro�ect, shall be DR 17 or thicker-walled Where
required, provide transition between IPS-size HDPE p�peffrttings and DIPS size pipe/f�ttings
�****.*�
Section 9-05 23 is supplemented with the followmg
Flange backup rings shall be stainless steel
All nuts, bolts, and washers shall be 304 SS or 316 SS
All flanged HDPE fittings shall be installed and torqued in accordance with Piastic Prpe
Institute document titled Bolt Torque for Polyethylene Flanged Joints TN-38 (July 2011)
HDPE Piae References
Pipe dimensions and manufacturing requirements
• ASTM F 714-05 Standard Specification for Polyethylene (PE) Pipe (SDR-PR) Based
on Outside Diameter This standard is used for most large diameter HDPE pipe
(4 inches to 63 inches) applications other than gas pipe
. ASTM D 2513-05 Standard Specification for Thermoplastic Gas Pressure Pipe,
Tubing and Fittmgs Polyethylene p�pe and other plastic for natural gas distribution
are descnbed in great detad in this standard
• ASTM D 3035-03a Standard Specification for Polyethylene (PE) Plastic Pipe
(DR-PR) Based on Controlled Outside Diameter Most HDPE water tubing (1/2 mch
to 3 inches) is made to the dimensions in this standard Whde pipe sizes up to
24 inches are provided, very little large diameter pipe is made to this standard
C►ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer Improvements Il1-135 November 2073
Contrac[ Documents Div�s�on 9
'
Installation Standards
• ASTM D 2321-05 Standard Practice for Underground Installation of Thermoplastic
Pipe for Sewers and Other Gravity Flow Applications
• ASTM D 2774-04 Standard Praetice for Underground Installation of Thermoplastic
Pressure Pipmg
• ASTM F 1962 Standard Guide for Use of Maxi-Horizontal Di�ectional Drdlmg for
Placement of Polyethylene Pipe or Conduit under Obstacles, Including River
Crossings
• ASTM F 585-94 Standard Practice for Insertion of Flexible Polyethylene Pipe into
Existmg Sewers
American Water Works Association Standards
• ANSI/A1NWA C 901-2005 Polyethylene Pressure Pipe and Tubing, 5 in (13 mm)
Through 3 in (76 mm) for Water Services
o ANSI/AW1NA C 906-2006 Polyethylene Pipe and Fittings, 4 in (100 mm) Through
63 In (1,575 mm) for Water Distribution
Piae Joinina Standards
• ASTM F 2620 — Standard Practice for Heat Fusion of Polyethylene Pipe and Fittings
• ASTM D 2657 — Standard Practice of Heat Fusion Joining of Polyolefin Pipe and
Fittmgs
• ASTM F 1290 — Standard Practice for Electrofusion Joining Polyolefm Pipe and
Fittings Fittmg Standards
a ASTM D 3261 — Standard Specification for Butt Heat Fusion Polyethylene (PE)
Plastic Fittings for Butt Fusion Polyethylene (PE) Plastic Fittings for Polyethylene
(PE) Plastic Pipe and Tubing
• ASTM F 1055 — Standard Specification for Electrofusion Fittings for Outside
Diameter Controlled Polyethylene Pipe and Tubing
9-30
9-30 1
WATER DISTRIBUTION MATERIALS
Pipe
�«..***� -
Section 9-30 1 is supplemented with the following
Ductde iron pipe, 12 inches in diameter and smaller, shall be thickness Class 52 unless
otherwise indicated on the Plans Ductde iron pipe and fittmg shall be United States Pipe
and Foundry Co , Pacific States Cast Iron Pipe, American Cast Iron Pipe Company, or
approved equal All pipe shall be push-on style with restrained �oints or using restramed �oint
push-on gaskets except where mecharncal �omts or flanged �oints are specifically required
C�ty of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer lmprovements ll1-136 November 2013
Contract Documents Diws�an 9
�
�
,
��
,
,
'
�
'
�**�***�
In Section 9-30 1(6), replace the second sentence with the followmg
Pipe materials shall be high-density polyethylene PE4710 conforming to a minimum cell
classification of PE 445574C per ASTM 3350
9-30.2 Fittings
9-30.2(6) Restrained Joints
�*:.****�
Section 9-30 2(60) is supplemented with the following
Restrained �oints are required for all pipe, fittings, and specials
Unless otherwise specified, restrained �oints shall be the push-on type modified for restraint
Joints shall be the Flex-Ring or Lok-Ring Joint as manufactured by Amencan Cast Iron Pipe
Company, TR Flex Joint as manufactured by US Pipe, or Boltless Restrained Joint Fastite
Jomt by Pacific States Cast Iron Pipe Company, or approved equal Restrained �oints shall
be capable of bemg deflected after full assembly Joints for pipe diameters 12 inches and
less shall be capable of a 5 0 degree deflection Joint assembly shall be in strict
conformance with ANSI/AW1NA C600 and manufacturer's recommendations No field cuts of
restrained pipe are permitted without prior approval of the Construction Manager
Restrained �oints shall be rated for 250-psi service pressures
' Restrained Jomt push-on gaskets may be used m lieu of restrained �omt pipe Field Lok
gaskets as manufactured by US Pipe, Fast Grip gaskets as manufactured by American Cast
Iron Pipe Company, or approved equal may be used Restrained �oint push-on gaskets must
be rated for 350 psi working pressure or greater and must meet the material requirements of
' ANSI/A1NWA C111/A2111 All manufacturer's mstructions, recommendations, and
requirements must be strictly adhered to when installing restramed �oint push-on gaskets '
, 9-30.3 Valves
'
'
�
,
'
9-30.3(4) Valve Boxes
�.::..*�
Section 9-30 3(4) is supplemented with the following
All valve boxes shall be two-piece cast iron, and equipped with a suitable extension for a
36-inch to 65-inch trench depth Top sections and lids will be designed for mstallation in
vehicular areas Lids will be labeled "WATER", and lid tabs wdl point in the direction of the
water mam All valves and valve boxes will be set plumb with the valve box centered on the
valve Valve box installation shall comply with the details shown in the plans for paved area
locations and unpaved area locations
Cast iron valve boxes shall be per City Standard Detad 5120
' Ciry of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documents
Il1-137
236-1896-113 (01/04)
November 2013
D�v�s�on 9
1
9-30 3(5) Valve Marker Posts
�***..*�
Replace Section 9-30 3(5) in its entirety with the following
Valve marker posts shall be Fog-Tite Meter Seal Company, or approved equivalent
9-30 5 Hydrants
�.....*�
Replace Section 9-30 5 in its entirety with the followmg
Fire hydrants shall conform to AVWVA Standard 502-80 for post-type, dry-barrel self-draining
hydrants suitable for at least 84-mch depth per City Standard Detail 5081 Hydrant
extensions shall be furrnshed and installed as necessary
Fire hydrants shall be Mueller Centurion, M&H 929, or approved equal
9-30.5(2) Hydrant Dimensions
�***�..�
Section 9-30 5(2) is supplemented with the following
All ports shall have National Standard Threads or other connection devices consistent with
local fire protection authority requirements All valves and caps shall open counterclockwise
and have a 12-inch flat point pentagon operation and cap nuts Hydrants shall be breakaway
trafFc models
The configuration of the fire hydrant assembly shall be as shown in the plans The assembly
shall have a cast iron tee (with mechanical �oint connections to the mam) a flanged tee, a
flanged gate valve with valve box, a 6-inch ductde iron pipe extension and shackle rods to
connect the hydrant to the auxiliary valve at the main The shackle rods shall be
3/4-inch-diameter steel rods of suitable length
9-30.5(6) Guard Posts
�***.**�
Replace Section 9-30 5(6) in its entirety with the following
Hydrant Guard Posts shall be per City Standard Detad 5083, where required
9-30.6 Water Service Connections (2 inches and Smaller)
�**::�**�
Section 9-30 6 is supplemented with the following
Water service connections shall be per City Standard Details 5001, 5002, and 5003
C�ty of Bremerton 236-1896-113 (01/04)
Wash�ngton Avenue Sewer lmprovements ll1-138 November 2013
Contract Documents Div�s�on 9
�
,
'
C'
'
�
'
9-30 6(1) Saddles
�******�
Replace Section 9-30 6(1) in its entirety with the following
Saddles shall be ductile iron, double strap with female (cc) thread outlet Saddles shall be
rated for 200-psi service pressures
9-30 6(2) Corporation Stops
�*��***�
Replace Section 9-30 6(2) in its entirety with the following
For polyethylene pipe, the corporation stop shall be with AW1NA tapered thread (cc) inlet by
compression Joint outlet All �oints with plastic pipe shall be made utilizing stainless steel
inserts along with couplings and adapters
9-30.6(3) Service P�pes
� 9-30.6(3)B Polyethylene Tubing
�*»****�
' Section 9-30 6(3)B is supplemented with the following
Service lines shall be black Himol Class 200 polypipe, copper tube sized, Driscol Pipe The
' tubing shall be coupled using compression fittings, conforming to the requirements of
A1NWA C800, minimum 200 psi working pressure Ford Grip Joint fittings are not
acceptable
�
�
�
'
'
�
,
' C�ry of Bremerton
Washmgton Avenue Sewer Improvements
Contract Documents
END OF DIVISION 9
111-139
�
236-1896-113 (01/04)
November 2013
D�v�s�on 9
�
'
�
'
,
'
'
'
l_ J
'
,
u
�
'
'
(August 5, 2013)
STANDARD PLANS
The State of Washington Standard Plans for Road, Bridge and Municipal Construction M21-01
transmitted under Publications Transmittal No PT 13-037, effective August 5, 2013 is made a
part of this contract
The Standard Plans are revised as follows
A-50 10
Sheet 2 of 2, Plan, with Single Slope Barner, reference C-14a is revised to C-70 10
A-50 20
Sheet 2 of 2, Plan, with Anchored Barrier, reference C-14a is revised to C-70 10
A-50 30
Sheet 2 of 2, Plan (top), reference C-14a is revised to C-70 10
B-10 20 and B-10 40
Substitute "step" in lieu of "handhold" on plan
8-25 20
Add Note 7 See Standard Specification Section &04 for Curb and Gutter requirements
B-90 40
Offset 8� Bend detads, add the subtitle, "Plan View" above titles
C-16a
Note 1, reference C-28 40 is revised to C-20 10
C-16b '
Note 3, reference C-28 40 is revised to C-20 10
C-70 10-00
Elevation, and Barrier Connection Detail, callout for premolded �omt fdler, revise 1/4" to 3/8"
Note 1, revise 1/4" to 3/8"
The Welded Wire Reinforcing Substitution Option Table is deleted The note, ""Optional
Substitutions to Welded Wire Reinforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Reinforcement Deformed,
for Concrete may be substituted for reinforcing steel in accordance with Standard
Specification 6-10 3 "
' C-75 10-00
Elevation, callout for premolded �oint filler, revise 1/4" to 3/8", Note 1, revise 1/4" to 3/8"
The Welded Wire Reinforcing Substitution Option Table is deleted The note, "*Optional
Substitutions to Welded Wire Reinforcements shall conform to Standard Specification
' Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Reinforcement Deformed,
for Concrete may be substituted for reinforcing steel in accordance with Standard
Specification 6-10 3 "
'
' C�ry of Bremerton
Washing[on Avenue Sewer lmprovements
Contrac[ Documents
ll1-141
236-1896-113 (Ol/04)
November 2013
Standard Plans
'
C-75 20-00
Elevation, callout for premolded �omt filler, revise 1/4" to 3/8", Note 1, revise 1/4" to 3/8"
The Welded Wire Reinforang Substitution Option Table is deleted The note, "*Optional
Substitutions to Welded Wire Reinforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Reinforcement Deformed,
for Concrete may be substituted for reinforcing steel in accordance with Standard
Specification 6-10 3 "
C-75 30-00
Elevation, and Plan views, callout for premolded �oint fdler, revise 1/4" to 3/8" ", Note 1,
revise 1 /4" to 3/8"
The Welded Wire Reinforcing Substitution Option Table is deleted The note, "*Optional
Substitutions to Welded Wire Reinforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Reinforcement Deformed,
for Concrete may be substituted for remforcing steel in accordance with Standard
Specification 6-10 3 "
C-80 10-00
The Welded Wire Reinforcing Substitution Option Table is deleted The note, "*Optional
Substitutions to Welded Wire Reinforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Reinforcement Deformed,
for Concrete may be substituted for reinforcing steel in accordance with Standard
Specification 6-10 3 "
C-80 20-00
The Welded Wire Remforcmg Substitution Option Table is deleted The note, "*Optional
Substitutions to Welded Wire Reinforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Reinforcement Deformed,
for Concrete may be substituted for reinforcmg steel in accordance with Standard
Specification 6-10 3 "
C-80 30-00
The Welded Wire Reinforcing Substitution Option Table is deleted The note, "*Optional
Substitutions to Welded Wire Reinforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Reinforcement Deformed,
for Concrete may be substituted for reinforcmg steel in accordance with Standard
Specification 6-10 3 "
C-80 40-00
The Welded Wire Reinforcing Substitution Option Table is deleted The note, "*Optional
Substitutions to Welded Wire Remforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Reinforcement Deformed,
for Concrete may be substituted for reinforcing steel m accordance with Standard
Specification 6-10 3 "
G85 14
General Notes, Note 1, reference to Standard Plan C-13 is revised to C-70 10
C-85 15
General Notes, Note 2, reference to Standard Plan C-13 is revised to C-70 10
C-85 16
General Notes, Note 1, reference to Standard Plan C-13 is revised to C-70 10
City of Bremerton 236-1896-113 (O7/04)
Washington Avenue Sewer Improvements ll1-142 November 2013
Contract Documents D►ws�on 9
1
�
�
'
��
�
�
'
C-85 18
General Notes, Note 1, reference to Standard Plan C-13 is rev�sed to C-70 10
C-85 20
General Notes, Note 3, reference to Standard Plan C-13 �s revised to C-70 10
D-3 10
Key Note 7, reference to 1130 04(5) 06 is revised to 730 05(5)
F-10 12
Note 1 See Standard Plan F-30 10 for Curb Expansion and Contraction Joint spacing Is
revised to read, "See Standard Plan F-30 10 for Curb Expansion and Contraction Joint
spacing and see Standard Specification section 8-04 and 9-04 for additional requirements "
F-10 62
Plan Title, Precast Concrete Sloped Mountable Curb is revised to read, "Precast Sloped
Mountable Curb"
F-10 64
Plan Title, Plan Title, Precast Concrete Dual Faced Sloped Mountable Curb is revised to
read, "Precast Dual Faced Sloped Mountable Curb"
F-30 10
' Sections, left side of sheet, (4 places), dimension, Sidewalk - 6' — 0" MIN (See Contract) is
rev�sed to read, "Sidewalk (See Contract)" Sect�on, top middle of sheet, dimension,
Sidewalk — 6' — 0" MIN (See Contract) is revised to read, "Sidewalk (See Contract)"
�
I�
��
�
i
LJ
F-80 10
Callout, top middle of sheet, Match Sidewalk Width See Contract Plans � 4' — 0" MIN is
revised to read, "Match Sidewalk Width See Contract Plans" dimension, PLAN VIEW ,
TYPE 2, (2 places), 4' — 0" MIN, is revised to read, "(See Contract)" dimension,
SECTION C, See Contract Plans � 4' — 0" MIN is revised to read, "See Contract Plans"
G-60 20
Side V�ew, callout, "Anchor Rod � 1-3/4" Diam x 4'-4" Threaded 8" Min Each End, W/ 2
Washers 8� 4 Heavy Hex Nuts � Galvanize Exposed Anchor Rod End for 1'-0" Min " is
revised to read, "Anchor Rod � 1-3/4" Diam x 4'-4" Threaded 8" Mm Each End, W/ 2
Washers & 6 Heavy Hex Nuts � Galvanize Exposed Anchor Rod End for 1'-0" Min "
G-60 30
End View, callout, "Anchor Rod � 1-3/4" Diam x 4'-4" Threaded 8" Min Each End,
t W/2 Washers and 4 Heavy Hex Nuts � Galvanize Exposed Anchor Rod End for 1'-0" Min "
is revised to read, "Anchor Rod � 1-3/4" Diam x 4'-4" Threaded 8" Min Each End,
W/2 Washers and 6 Heavy Hex Nuts � Galvanize Exposed Anchor Rod End for 1'-0" Min "
�
'
'
H-70 20
Sheet 2, Spacing Detail, Madbox Support Type 1, reference to Standard Plan I-70 10 is
revised to H-70 10
I-50 10
Deleted
� C�ty of Bremerton
Washington Avenue Sewer Improvements
Contract Documents
111-143
236-1896-113 (Ol/04)
November 2013
S[andard Plans
'
J-3b
Sheet 2 of 2, Plan View of Service Cabinet, Boxed Note, "SEE STANDARD PLAN J-6C "
is revised to read "SEE STANDARD PLAN J-10 10 "
Sheet 2 of 2, Plan �ew of Service Cabinet Notes, references to Std Plan J-9a are revised
to J-60 05 (3 instances)
J-10 10
Note 2 The contractor shall install the conduits in the locations shown Conduits shall
extend 2" min above the coupling The conduit containmg unfused utdity conductors shall
extend into the utility chase is revised to read
"The contractor shall install the conduits in the locations shown Conduits shall extend 2"
min above the coupling The grounded end bushmg on GRS conduit and the end bell
bushing on PVC conduit shall extend 3" max above the coupling The conduit contairnng
unfused utdity conductors shall extend into the utdity chase "
Note 4 The cabinets shall be attached to the foundation with 4 each 1/2" xiT2°� x 2°° x 4�°
hot dip galv anchor bolts, washers, and nuts Stainless steel epoxy anchors may be
used as an alternative, and shall be 1/2" diam X 9", or 5/8" diam X 8" Bolts shall
extend 1 1/2" min to 2" max above the concrete pad is revised to read
"The cabinets shall be attached to the foundation with 4 each 1/2" x 12" x 2" x 4" anchor
bolts, washers, and nuts conforming to Section 9-06 5(1) and galvanized after fabrication in
accordance with AASHTO M 232 Stamless steel epoxy anchors may be used as an
alternative, and shall be 1/2" diameter x 9", or 5/8" diameter x 8" Threaded Rod
(conforming to ASTM F 593), washers (conforming to ASTM A 240), and nuts (conforming
to ASTM F 594), all shall be Type 304 stamless steel Bolts shall extend 1-1/2" min to 2"
max above the concrete pad "
J-10 15
ANCHOR BOLT detail, callout — ASTM A307 with washer and nut — Galvarnzed per
AASHTO M 232 is revised to read, "Anchor bolts, washers, and nuts conforming to Section
9-06 5(1) and galvarnzed after fabrication in accordance with AASHTO M 232 "
J-15 10 - -
Elevat�an V�ew (3x), Depth dimension, reads, "Depth � See Std Spec 9-20 3(14)E and
Contract", revised to read, "Depth � See Std Spec 8-20 3(13)A and Contract"
J-15 15 � �
General Notes, Note 3, reference to Standard Plan J-7c is revised to J-27 15
J-16b
Deleted
J-16c
Deleted
J-20 10-02
Foundation Detad, callout, "1/2" diameter steel hex nut, with 1-1/2" flat washer (2) each
req'd per anchor bolt" is revised to read, 1/2" diameter steel heavy hex nut, with 1/2" flat
washer (2) each req'd per anchor bolt
City of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer lmprovements ll1-144 Novembe� 2013
Contract Documents D�v�s�on 9
'
'
�
�
'
'
�
,
,
�
�
LJ
'
'
,
�
�
'
J-20 11-01
Sheet 1, View A, caliout, "'I/2" x 26" full thread �(4) required 1/2" hex nuts �(4) required
per anchor bolt" is revised to read, "1/2" x 24" full thread �(4) required 1/2" heavy hex nuts
� (4) required per anchor bolt"
Section B, callout, "1/2" diameter steel hex nut, with 1/2" flat washer, (2) required per
anchor bolt" is revised to read, 1/2" diameter steel heavy hex nut, with 1/2" flat washer,
(2) required per anchor bolt
Sheet 2, Elevation, callout, "Anchor bolt 1/2" x 28" full thread �(4) required 1/2" hex nuts �
(4) required per anchor bolt" is revised to read Anchor bolt 3/4" x 36" full thread �(4)
required 3/4" heavy hex nuts �(4) requ�red per anchor bolt"
J-20 16
Elevation, callout, "1/4" Premolded Joint Fdler" is revised to read, "3/8" Premolded Joint
Filler"
Add General Note 9"Junction Box serving the Standard shall preferably be located 5' — 0"
(10' — 0" Max ) from the Standard "
J-21 10-03
Sheet 1, Round Concrete Foundation Detad, Elevation, callout, "3/4" hex nuts, steel, (4)
Req'd per Anchor BoIY' is revised to read, Anchor bolt �/" x 30" full thread �(4) required s/"
heavy hex nuts, steel, (4) Req'd per Anchor Bolt
Sheet 1, Square Concrete Foundation Detad, Elevation, callout, "3/4" hex nuts, steel,
(4) Req'd per Anchor Bolt" is revised to read, Anchor bolt 3/4" x 30" full thread �
(4) required 3/4" heavy hex nuts, steel, (4) Req'd per Anchor Bolt
Sheet 1, Detail C, callout, "Base Plate Assembly � 1/2" Diam steel hex nut, with 1-1/2" flat
washer, 2 each req'd per anchor bolt � mmimum of 2 threads above top of nut or 5/8"
maximum (Typ )" is revised to read, Base Plate Assembly � 3/4" heavy hex nut, with 3/4"_
flat washer, 2 each req'd per anchor bolt � mmimum of 2 threads above top of nut or 5/8"
maximum (Typ )"
Sheet 2, Round Concrete Foundation Detail, Elevation, callout, "Anchor Bolts �(4) req'd
per assembly (Typ )" is revised to read, Anchor Bolt 3/4" x 30" full thread �(4) req'd per
assembly (Typ )"
Callout, "3/4" hex nuts, steel �(4) req'd per anchor bolt° is revised to read, 3/4" heavy hex
nuts, steel �(4) req'd per anchor bolt
Sheet 2, Round Concrete Foundation Detail, Elevation, callout, "Anchor Bolts �(4) req'd
per assembly (Typ )" is revised to read, Anchor Bolt 3/4" x 30" full thread �(4) req'd per
assembly (Typ )"
Callout, "3/4" hex nuts, steel �(4) req'd per anchor bolt" is revised to read, 3/4" heavy hex
nuts, steel �(4) req'd per anchor bolt
J-22 15-01
Ramp Meter Signal Standard, elevation, dimension 4'6" is revised to read, 6'-0"
C�ty of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer Improvements ll1-145 November 2013
Contract Documents Standard Plans
'
J-29 10
Galvanized Welded Wire Mesh detail, callout —"Drill and Tap for 1/4" Diam Cap Screw,
3 Places, @ 9" center, all 4 edges S S Screw, ASTM F593 and washer"
Is revised to read, "Drill and Tap for 1/4" Diam Cap Screw, 3 Places, at 9" center, all
4 edges S S Screw, ASTM F593 and washer Liberally coat the threads with Anti-seize
Compound "
J-29 15
Title, "Camera Pole Standard" is revised to read, "Camera Pole Standard Detads"
J-29-16
Title, "Camera Pole Standard Details" is revised to read, "Camera Pole Detads"
J-60 14
All references to J-16b (6x) are revised to read, J-60 11
J-75 40
Monotube Sign Structure, elevation, callout — EQUIPMENT GROUNDING CONDUCTOR �
SIZE PER NEC MINIMUM SIZE #8 Is revised to read, EQUIPMENT GROUNDING
CONDUCTOR � SIZE PER NEC mmimum s¢e #4 AWG
Detail C, callout— EQUIPMENT GROUNDING CONDUCTOR � CLAMP TO STEEL
REINFORCING BAR, SIZE PER NEC MIN SIZE #8 Is revised to read, EQUIPMENT
GROUNDING CONDUCTOR � CLAMP TO STEEL REINFORCING BAR, SIZE PER NEC
minimum size #4 AWG
Detad C, callout — Stainless Steel, selftapping 1/4" Diam Screw w/ S S Washer, space
approx 9" O C is revised to read, "Stainless Steel, selftapping 1/4" Diam Screw w/ S S
Washer, space approx 9" O C, liberally coat the threads with Anti-seize compound"
J-75 45
Elevation, callout — EQUIPMENT GROUNDING CONDUCTOR � SIZE PER NEC
MIIVIMUM SIZE #8 Is revised to read EQUIPMEfVT GROUNDIiVG COIVDUCTOR � SIZE
PER NEC mmimum size #4 AWG
Detail D, callout— EQUIPMENT GROUNDING CONDUCTOR � CLAMP TO STEEL
REINFORCING BAR, SIZE PER NEC MIN SIZE #8 is revised to read EQUIPMENT
GROUNDING CONDUCTOR � CLAMP TO STEEL REINFORCING BAR, SIZE PER NEC
minimum size #4 AWG
Detad C, callout — Sta�nless Steel, selftapping 1/4" Diam Screw w/ S S Washer, space
approx 9" O C is revised to read, "Stainless Steel, selftapping 1/4" Diam Screw w/ S S
Washer, space approx 9" O C, liberally coat the threads with Anti-seize compound"
J-90 10
Section B, callout, "Hardware Mountmg Rack � S S 1-5/8" Slotted Channel" is revised to
read "Hardware Mounting Rack (Typ )� Type 304 S S 1-5/8" Slotted Channel"
J-90 20
Section B, callout, "Hardware Mounting Rack (Typ )� S S 1-5/8" Slotted Channel" is
revised to read "Hardware Mounting Rack (Typ )� Type 304 S S 1-5/8" Slotted Channel"
K-80 30
In the NARROW BASE, END view, the reference to Std Plan C-8e is revised to Std Plan
K-80 35
C�ty of Bremerton 236-1896-113 (Ol/04)
Washington Avenue Sewer lmprovements ll1-146 November 2013
Contract Documen[s Divis�on 9
'
,
'
'
,
'
'
�
,
'
,
'
1
'
'
�
'
,
'
The following are the Standard Plan numbers applicable at the time this pro�ect was advertised
The date shown with each plan number is the publication approval date shown in the lower
right-hand corner of that plan Standard Plans showing different dates shall not be used in this
contract
A-10 10-00 8/7/07 A-30 35-00 10/12/07 A-50 20-01 9/22/09
A-10 20-00 10/5/07 A-40 00-00 8/11/09 A-50 30-00 11/17/08
A-10 30-00 10/5/07 A-40 10-02 6/2/11 A-50 40-00 11 /17/08
A-20 10-00 8/31 /07 A-40 15-00 8/11 /09 A-60 10-01 10/14/09
A-30 10-00 11/8/07 A-40 20-02 5/29/13 A-60 20-02 6/2/11
A-30 15-00 11 /8/07 A-40 50-01 6/2/11 A-60 30-00 11 /8/07
A-30 30-01 6/16/11 A-50 10-00 11 /17/08 A-60 40-00 8/31 /07
B-5 20-01 6/16/11 B-30 50-01 4/26/12 B-75 20-01 6/10/08
B-5 40-01 6/16/11 B-30 70-03 4/26/12 B-75 50-01 6/10/08
B-5 60-01 6/16/11 B-30 80-00 6/8/06 B-75 60-00 6/8/06
B-10 20-01 2/7/12 B-30 90-01 9/20/07 B-80 20-00 6/8/06
B-10 40-00 6/1 /06 B-35 20-00 6/8/06 B-80 40-00 6/1 /06
B-10 60-00 6/8/06 B-35 40-00 6/8/06 B-82 20-00 6/1 /06
B-15 20-01 2/7/12 8-40 20-00 6/1 /06 B-85 10-01 6/10/08
B-15 40-01 2/7/12 B-40 40-01 6/16/10 B-85 20-00 6/1/06 �
B-15 60-01 2R/12 B-45 20-00 6/1 /06 B-85 30-00 6/1 /06 h
B-20 20-02 3/16/12 B-45 40-00 6/1 /06 B-85 40-00 6/8/06
B-20 40-03 3/16/12 B-50 20-00 6/1 /06 B-85 50-01 6/10/08
B-20 60-03 3/15/12 B-55 20-00 6/1 /06 B-90 10-00 6/8/06
B-25 20-01 3/15/12 8-60 20-00 6/8/06 B-90 20-00 6/8/06
B-25 60-00 6/1 /06 B-60 40-00 6/1 /06 B-90 30-00 6/8/06
B-30 10-01 4/26/12 8-65 20-01 4/26/12 B-90 40-00 6/8/06
B-30 20-02 4/26/12 B-65 40-00 6/1/06 B-90 50-00 6/8/06
B-30 30-01 4/26/12 B-70 20-00 6/1 /06 B-95 20-01 2/3/09
B-30 40-01 4/26/12 B-70 60-00 6/1 /06 B-95 40-00 6/8/06
C�ty of Bremerton 236-7896-113 (Ol/04)
Washington Avenue Sewer Improvements ll1-147 November 2013
Contract Documents Standard Plans
�
C-1 6/16/11 C-6 5/30/97 C-23 60-02 6/21/12
C-1 a 10/14/09 C-6a 10/14/09 C 24 10-00 7/12/12
C-1 b 6/16/11 C-6c 1/6/00 C-25 18-03 7/2/12
C-1 c 5/30/97 C-6d 5/30/97 C-25 20-05 7/2/12
C-1 d 10/31 /03 C-6f 7/25/97 C-25 22-04 7/2/12
C-2 1/6/00 C-7 6/16/11 C-25 26-02 7/2/12
C-2a 6/21 /06 C-7a 6/16/11 C-25 80-02 7/2/12
C-2b 6/21 /06 - C-8 2/10/09 C-40 14-02 7/2/12
C-2c 6/21 /06 C-8a 7/25/97 C-40 16-02 7/2/12
C-2d 6/21/06 C-8b 6/27/11 C-4018-02 7/2/12
C-2e 6/21 /06 C-8e 2/21 /07 C-70 10-00 4/8/12
C-2f 3/14/97 C-8f 6/30/04 C-7510-00 4/8/12
C-2g 7/27/01 C-10 6/3/10 C-75 20-00 4/8/12
C-2h 3/28/97 C-16a 6/3/10 C-75 30-00 4/8/12
C-2i 3/28/97 C-16b 6/3/10 C-8010-00 4/8/12
C-2� 6/12/98 C-20 10-01 6/20/13 C-80 20-00 4/8/12
C-2k 7/27/01 C-20 14-02 7/2/12 C-80 30-00 4/8/12
C-2n 7/27/01 C-20 15-01 7/2/12 C-80 40-00 4/8/12
C-2o 7/13/01 C-20 18-01 7/2/12 C-80 50-00 4/8/12
C-2p 10/31 /03 C-20 19-01 7/2/12 C-85 10-00 4/8/12
C-3 6/27/11 C-20 40-03 7/2/12 C-85 11-00 4/8/12
C-3a 10/4/05 C-20 42-03 7/2/12 C-85 14-00 6/16/11
C-3b 6/27/11 C-20 45 01 7/2/12 C-85 15-00 6/16/11
C-3c 6/27/11 C-2214-02 6/16/11 C-8516-00 6/16/11
C-4b 6/8/06 C-2216-03 4/18/12 C-85-18-00 6/16/11
C-4e 2/20/03 C-22 40-02 6/16/10 C-85 20-00 6/16/11
C-4f 7/2/12 C-22 45 00 6/16/11 C-90 10-00 7/3/08
�
'
'
�
'
'
��
'
e
C'�
'
I-1
�
fJ
'
'
C�ty of Bremerton 236-1896-113 (Ol/04) �
Wash►ngton Avenue Sewer Improvements ll1-148 Novem6er 2013
Contract Documents D�wsion 9
�
�
,
'
,
'
'
,
'
,
�
'
�
'
�
�
'
'
'
�
D-2 04-00 11 /10/OS D-2 48-00 11 /10/05 D-3 17-01 5/9 7/12
D-2 06-01 1/6/09 D-2 64-01 1/6/09 D-4 12/11 /98
D-2 08-00 11 /10/05 D-2 66-00 11 /10/05 D-6 6/19/98
D-2 14-00 11 /10/05 D-2 68-00 11 /10/05 D-10 10-01 12/2/08
D-2 16-00 11/10/05 D-2 80-00 11/10/05 D-10 15-01 12/2/08
D-2 18-00 11 /10/05 D-2 82-00 11 /10/05 D-10 20-00 7/8/08
D-2 20-00 11 /10/05 D-2 84-00 11 /10/05 D-10 25-00 7/8/08
D-2 32-00 11 /10/05 D-2 86-00 11 /10/05 D-10 30-00 7/8/08
D-2 34-01 1/6/09 D-2 88-00 11/10/05 D-10 35-00 7/8/08
D-2 36-02 1/6/09 D-2 92-00 11/10/05 D-10 40-01 12/2/08
D-2 42-00 11 /10/05 D-3 09-00 5/17/12 D-10 45-01 12/2/08
D-2 44-00 11 /10/05 D-3 10-01 5/29/13 D-15 10-01 12/2/08
D-2 60-00 11/10/05 D-3 11-02 5/29/13 D-15 20-02 6/2/11
D-2 62-00 11/10/05 D-3 15-02 6/10/13 D-15 30-01 12/02/08
D-2 46-00 11 /10/05 D-3 16-02 5/29/13
E-1 2/21l07 1E-4 8/27/03
E-2 5/29/98 E-4a 8/27/03
F-10 12-02 6/16/11 F-10 62-01 9/05/07 F-40 15-02 6/20/13
F-10 16-00 12/20/06 F-10 64-02 7/3/08 F-40 16-02 6/20/13
F-1018-00 6/27/11 F-3010-02 6/20/13 F-4510-01 6/21/12
F-10 40-02 6/21 /12 F-40 12-02 6/20/13 F-80 10-02 3/15/12
F-10 42-00 1/23/07 F-40 14-02 6/20/13
G-10 10-00 9/20/07 G-24 60-02 5/20/13 G-70 20-02 6/10/13
G-20 10-OQ 9/20/07 G-25 10-04 6/10/13 G-70 30-02 6/10/13
G-22 10-01 7/3/08 G-30 10-02 6/20/13 G-90 10-01 5/11 /11
G-24 10-00 11 /8/07 G-50 10-01 6/20/13 G-90 20-02 3/22/13
G-24 20-01 2/7/12 G-60 10-02 6/10/13 G-90 30-02 3/25/13
G-24 30-01 2R/12 G-60 20-01 6/27/11 G-90 40-01 10/14/09
G-24 40-03 6/20/13 G-60 30-01 6/27/11 G-95 10-01 6/2/11
G-24 50-02 6/20/13 G-70 10-02 6/10/13 G-95 20-02 6/2/11
City of Bremerton 236-1896-113 (01/04)
Washington Avenue Sewer Improvements ll1-149 November 2013
Contract Documents Standard Plans
�
J
H-1010-00 7/3/08 H-3210-00 9/20/07 H-7010-01 2/7/12
H-10 15-00 7/3/08 H-60 10-01 7/3/08 H-70 20-01 2/16/12
H-30 10-00 10/12/07 H-60 20-01 7/3/08 H-70 30-02 2/7/12
1-10 10-01 8/11/09 I-30 20-00 9/20/07 I-40 20-00 9/20/07
I-30 10-02 3/22/13 I-30 30-01 6/10/13 I-50 20-01 6/20/13
I-30 15-02 3/22/13 I-30 40-01 6/10/13 I-60 10-01 6/10/13
I-30 16-00 3/22/13 I-30 60-00 5/29/13 I-60 20-01 6/10/13
I-3017-00 3122/13 I-4010-00 9/20/07 I-8010-01 8/11/09
J-3 8/1197 J-26 15-01 5/17/12 J-40 40-00 5/20/13
J-3b 3/4/05 J-2710-00 3/15/12 J-5010-00 6/3/11
J-3c 6/24102 J-2715-00 3115J12 J-5011-00 6/3/11
J-10 7/18/97 J-28 10-01 5/11 /11 J-50 12-00 6/3/11
J-10 10-01 5111/11 .f-28 22-00 8i07107 J-50 15-00 6i3i11
J-10 15-00 7/2/12 J-28 24-00 8/07/07 J-50 16-01 3/22/13
J-10 22-00 5/29/13 J-28 26-01 12/02/08 J-50 20-00 6i3i11
J-15 10-00 5/8/12 J-28 30-02 6/27/11 J-50 25-00 6/3/11
J-15 15-00 6/16/10 J-28 40-01 10/14/09 J-50 30-00 6/3/11
J-16b 2/10/09 J-28 42-00 8/07/07 J-60 05-00 6/16/11
J-16c 2/10/09 J-28 45-01 6/27/11 J-60 11-00 5/20/13
J-20 10-02 6/10/13 J-28 50-02 6/2/11 J-60 12-00 5/20/13
J-20 11-01 6/10/13 J-28 60-01 6/2/11 J-60 13-OQ 6/16/10
J-20 15-02 6/10/13 J-28 70-01 5/11 /11 J-60 14-00 6/16/10
J-20 16-01 7/12/12 J-29 10-00 6/27/11 J-75 10-01 5/11 /11
J-20 20-02 5/20/13 J-29 15-00 6/27/11 J-75 20-00 2/10/09
J-20 26-01 7/12/12 J-29 16-01 6/20/13 J-75 30-01 5/11/11
J-21 10-03 6/10/13 J-40 10-03 5/20/13 J-75 40-00 10/14/09
J-21 15-01 6/10/13 J-40 20-01 5/17/12 J-75 45-00 10/14/09
J-21 16-01 6/10/13 J-40 30-03 5/20/13 J-90 10-01 6/27/11
J-21 17-01 6/10/13 J-40 35-01 5/29/13 J-90 20-01 6/27/11
J-21 20-01 6/10/13 J-40 36-01 5/20/13
J-22 15-01 6/10/13 J-40 37-01 5/20/13
J-22 16-02 6/10/13 J-40 38-01 5/20/13
J-26 10-02 3/15/12 J-40 39-00 5/20/13
���1
�
,
,
'
'
'
�I
—�
Ir �
�
�
�'
C
�
'
'
'
C�ty of Bremerton 236-7896-113 (Ol/04) �
Washington Avenue Sewer Improvements ll1-150 November 2013
Contract Documents Divis�on 9
'
'
�
,
�
�
,
'
'
�
'
,
'
�
�
'
�
'
'
'
K-70 20-00 2/15/07 K-80 20-00 12/20/06 K-80 35-00 2/21 /07
K-80 10-00 2/21 /07 K-80 30-00 2/21 /07 K-80 37-00 2/21 /07
L-10 10-02 6/21 /12 L-40 10-02 6/21 /12 L-70 10-01 5/21 /08
L-20 10-02 6/21 /12 L-40 15-01 6l16/11 L-70 20-01 5/21 /08
L-30 10-01 6/16/11 L-40 20-02 6/21 /12
M-1 20-02 6/3/11 M-9 60-00 2/10/09 M-40 10-02 5/11/11
M-1 40-02 6/3/11 M-11 10-01 1/30/07 M-40 20-00 10/12/07
M-1 60-02 6/3/11 M-15 10-01 2/6/07 M-40 30-00 9/20/Q7
M-1 80-03 6/3/11 M-17 10-02 7/3/08 M-40 40-00 9/20/07
M-2 20-02 6/3/11 M-20 10-02 6/3/11 M-40 50-00 9/20/07
M-3 10-03 6/3/11 M-20 20-01 1/30/07 M-40 60-00 9/20/07
M-3 20-02 6/3/11 M-20 30-02 10/14/09 M-60 10-01 6/3/11
M-3 30-03 6/3/11 M-20 40-02 6/3/11 M-60 20-02 6/27/11
M-3 40-03 6/3/1'I M-20 50-02 6/3/11 M-65 10-02 5/11/11
M-3 50-02 6/3/11 M-24 20-01 5/31 /06 M-80 10-01 6/3/11
M-5 10-02 6/3/11 M-24 40-01 5/31 /06 M-80 20-00 6/10/08
M-7 50-01 1/30/07 M-24 50-00 6/16/11 M-80 30-00 6/10/08
M-9 50-01 1/30/07 M-24 60-03 5/11 /11
4
END OF STANDARD PLANS
City of Bremerton
Wash�ngton Avenue Sewer Improvements
Contract Documents
ll1-151
236-1896-113 (Ol/04)
November 2013
Standard Plans
THIS PAGE INTENTIONALLY LEFT BLANK
C�ty of Bremerton 236-1896-113 (Ol/04)
Wash�ngton Avenue Sewer lmprovements ll1-152 November 2013
Contract Documents D�v�s�on 9
��
'
` J
'
,
�
,
�
'
�
'
'
I�
�
'
I�
�I
�
IJ
APPENDIX A
KITSAP COUNTY PREVAILING WAGE RATES
�
�
�
'
�
'
'
1
'
'
'
'
�
'
'
�
�
�
'
'
Page 1 of 17
State of Washington
Department of Labor & Industries
Prevail�ng Wage Section - Telephone 360-902-5335
PO Box 44540, Olymp�a, WA 98504-4540
Washington State Prevailing Wage
The PREVAILING WAGES l�sted here �nclude both the hourly wage rate and the hourly rate
of fringe benefits. On publu works projects, worker's wage and benef�t rates must add to
not less than this total. A br�ef descnption of overt�me catculat�on requ�rements are
prov�ded on the Benef�t Code Key.
Journey Level Prevailing Wage Rates for the Effective Date
11/8/2013
� _�� �. � � � . � . � � � � � �� , r�a �, � �,a �� � � � �
Krtsap Asbestos Ab
Krtsap Bo�termaker
K�tsap Bnck Mason
K�tsap Bnck Mason
Krtsap Bnck Mason
K�tsap Build�n� Ser
; Krtsap
Kitsap
K�tsap
' K�tsap
�
K�tsap
K�tsap
, K�tsap
' K�tsap
Krtsap
K�tsap
F Kitsap
`K�tsap
`Kitsap
t�,.�__..
� K�tsap D�vers £� Tenders
Kitsap Dred�e Workers
Krtsap Dred�,e Workers
�
Journey Level
Journey Level
Bnck And Biock Fimsher
Journey Level
Po�nter-Caulker-Cleaner
Jamtor
Shampooer
Waxer
Wmdow Cleaner
Journey Level
Acoustual Worker
Bndge, Dock And Wharf
Carpenters
Carpenters on Stat�
Creosoted Matenal
Floor Fimsher
Floor Layer
Scaffold Erector
Journev Level
D�ver
Drver On Standby
D�ver Tender
Surface Rcv �t Rov Opera
Surface Rcv £t Rov Opera
Tender
Ass�stant Engineer
Ass�stant Mate (Deckhan
httns //fortress wa �ov/lru/wa�elookup/prvWagelookup aspx
$41.69 5D
$30 34
$43.26 5A
$50.12 5A
$50 12 5A
$9.19
$9 19
$9.19
$13.22
$23 72
$50.82 5D
$50 82 5D
$50 82 5D
Tools $50 95 5D
$50 92 5D
$50.82 5D
$50.82 5D
$50.82 5D
$51 18 7A
$100 28 5D
$56 68 5D
$52.23 5D
tor $52.23 5D
tor $48 67 5A
$53 00 5D
d) $52 58 5D
artime Note
1H s
1
1M
1M �
1M
1
1 �
1
1
�
1M �
1M
1M �
1M
1M
1M
1M
1M
1M
1 M 8A
1M
1M
1M
1B
3F
�
�
11 /8/2013
K�tsap Dredge Workers
K�tsap Dred�e Warkers
�Kitsap Dred�e Workers
K�tsap �rywatt Appluator
,K�tsap Drywalt Tapers
K�tsap Electncai F�xture Mamtei
Workers
K�tsap Electnc�ans - lns�de
K�tsap Etectnc�ans - Motor ShaQ
K�tsap Electnc�ans - Motor Shop
K�tsap Electnc�ans - Powerl�ne
Construct�on
K�tsap Etectncians - Powerl�ne
Construct�on
K�tsap Etectnc�ans - PowerE�ne
Construction
�K�tsap Etectnc�ans - Powerhne
Construct�on
\ K�tsap Etectnc�ans - Powerline
Construct�on
,K�tsap Electr�c�ans - Powert�ne
Construct�on
Kitsap Eleetnc�ans - PowerE�ne
Construct�on
K�tsap Electnc�ans - Powert�ne
Construct�an
� K�tsap Etectron�c Techn�c�ans
�K�tsap Etevator Constru�tors
K�tsap Elevator Construc�ars
K�tsap Fabricated Precast Concr
K�tsap �"ence Erectars
K�tsap Fence Erectnrs
K�tsap Ftag�ers
K�tsap Glaz�ers
�Kitsap Heat Ft Frost Insutators And
Asbestos Workers
Krtsap Heatin Equ� mer�t Mecham
Kitsap
intand Boatmen
K�tsap
Boatmen
Engineer Welder
Leverman, Hydraulic
Otiler
Journey Level
Journey Level
Journey Level
Journev Level
Journey Level
Cable Spl�cer
Cert�fied Lme Welder
Groundperson
Heavy L�ne Equ�pment
Operator
Journey Level L�neperson
L�ne Equ�pment Operator
Pole Sprayer
Powderperson
Journey Level
Mecharnc
Mecharnc In Charge
Journey Level - In-Factory
Work Only
Fence Erector
Fence Laborer
Journey Level
Journey Level
Journeyman
Journey Level
Journey Level
Journey Level
Boat Operator
Cook
Deckhand
Deckhand En�meer
$52.30 5D
$54 04 5D
$55.17 5D
$52.30 5D
$52.58 5D
$50.82 5D
$49.79 5P
$31.74
$51 26
$15.37
$14.69
$66.43 5A
$60 75 5A
$42.36 5A
$60 75 5A
$60.75 5A
$51.05 5A
$60 75 5A
$45 39 5A
$44 78 7E
$77 70 7D
$84 24 7D
$13 50
$13.80
$11.60
$35.34 7A
$53 76 7L
$58 93 5J
$69.37 7F
$42 99 7A
$9 24
$52 51 5B
$48 89 5B
$49 13 5B
$50 12 56
Page 2 of 17
3F � �
3F
3F
1H
1E
1
1
1
1
4A
4A
4A
4A
4A
4A
4A
4A
1D
a
�
4A
1
1
1
2Y
1Y
1S
1E
2Y
1
1K
1K
1K
https //fortress wa gov/hu/wagelookup/prvWagelookup aspx 11/8/2013
�
1
'
�
�
�
'
'
'
'
'
,
�
'
�
'
�
'
'
� K�tsap ir�tand Boatmen Launch Operator $51 34 56
° K�tsap Inland 8oatmen Mate $51.34 5B
�Kitsap Insaect�on/Clean�ng/Seal�nQ Of Cleaner Operator, Foamer $9 73
Sewer i� Water Sarst ,ems By Operator
Remote Cantrol
K�tsap Ins�ect�anlCtearnnQ/Seal�n� Of Grout Truck Operator $11.48
Kitsap
K�tsap
� K�tsap
� K�tsap
K�tsap
K�tsap
K�tsap
K�tsap Laborers
Kitsap Laborers
� K�tsap Laborers
Kitsap Labarers
Kitsap Laborers
K�tsap Laborers
K�tsap
K�tsap
A K�tsap
� Kitsap
K�tsap
Kitsap
n K�tsap
� K�tsap
� Kitsap
K�tsap
� K�tsap
, Krtsap
K�tsap
Head Operator $12.78
Tv Truck Operator $24.17
Journey Level $50 82 5D
Journeyman $59.77 7N
Air, Gas Or Electnc V�brat�ng $41.69 7A
Screed
Airtrac Dnll Operator $42.99 7A
Ballast Regular Machine $41 69 7A
Batch We�ghman $35.34 7A
Bnck Pavers $41 69 7A
Brush Cutter $41.69 7A
Brush Hog Feeder $41.69 7A
Burner $41 69 7A
Caisson Worker $42 99 7A
Carpenter Tender $41.69 7A
Caulker $41.69 7A
Cement Dumper-pav�ng $42 46 7A
Cement Fm�sher Tender $41.69 7A
Change House Or Dry Shack $41.69 7A
Chipp�ng Gun (under 30 Lbs.) $41.69 7A
Chipping Gun(30 Lbs And $42 46 7A
Over)
ChokerSetter $41.69 7A
Chuck Tender $41 69 7A
Clary Power Spreader $42.46 7A
Clean-up Laborer $41 69 7A
Concrete Dumper/chute $42.46 7A
Operator
Concrete Form Stnpper $41 69 7A
Concrete Placement Crew $42.46 7A
Concrete Saw Operator/core $42 46 7A
Dnller
CrusherFeeder $35.34 7A
Cunng Laborer $41.69 7A
Demol�tion: Wreck�ng £t Movmg $41 69 7A
https //fortress wa gov/lru/wagelookup/prvWagelookup aspx
Page 3 of 17
1K
1K
1
1
1
1
1M
10
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
F
�
r
�
�
€
�
11/8/2013
Page 4 of 17
�K�tsap Laborers
Kitsap Laborers
�Krtsap Laborers
, Kitsap Laborers
Kitsap Laborers
K�tsap Laborers
Kitsap Laborers
,Kitsap Laborers
K�tsap Laborers
�K�tsap Labvrers
Kitsap
� Krtsap
�K�tsap Laborers
K�tsap Laborers
K�tsap Laborers
K�tsap Laborers
K�tsap Laborers
mKitsap Laborers
�
,K�tsap Laborers
K�tsap Laborers
K�tsap Laborers
Kitsap Laborers
K�tsap Laborers
�K�tsap Laborers
Kitsap Labarers
K�tsap Laborers
<
K�tsap Laborers
Kitsap Laborers
�Kitsap Laborers
Kitsap Laborers
, Kitsap �aborers
�Krtsap L.abarers
(�ncL Charred Matenal)
D�tch Digger $41.69 7A
Diver $42.99 7A
DnllOperator $42.46 7A
(hydraul�c,d�amond)
Dry Stack Walls $41.69 7A
Dump Person $41.69 7A
Epoxy Techmcian $41 69 7A
Erosion Control Worker $41 69 7A
Faller £t Bucker Chain Saw $42.46 7A
F�ne Graders $41.69 7A
F�rewatch $35.34 7A
Form Setter $41.69 7A
Gab�an Basket Builders $41 69 7A
General Laborer $41.69 7A
Grade Checker � Transit $42 99 7A
Person
Gnnders $41.69 7A
Grout Machine Tender $41 69 7A
Groutmen (pressure)�ncluding $42 46 7A
Post Tens�on Beams
Guardrail Erector $41.69 7A
Hazardous Waste Worker (level $42 99 7A
A)
Hazardous Waste Worker (level $42 46 7A
B)
Hazardous Waste Worker (level $41 69 7A
C)
H�gh Scaler $42.99 7A
Jackhammer $42.46 7A
Laserbeam Operator $42.46 7A
Ma�ntenance Person $41 69 7A
Manhole Bu�lder-mudman $42 46 7A
Matenal Yard Person $41 69 7A
Motorman-dinky Locomotrve $42 46 7A
Nozzteman (concrete Pump, $42.46 7A
Green Cutter When Usmg
Comb�nation Of High Pressure
Arr £t Water On Concrete �t
Rock, Sandblast, Gumte,
Shotcrete, Water Bla
Pavement Breaker $42.46 7A
P►lot Car $35 34 7A
P�pe Layer Lead $42 99 7A
Pipe Layer/ta�lor $42.46 7A
Pipe Pot Tender $42.46 7A
P�pe Reliner $42.46 7A
2Y �
2Y
2Y
2Y
2Y �
2Y '
2Y
2Y �
�
2Y
2Y
2Y �
2Y �
2Y �
2Yfr
2Y
�
2Y `
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
https //fortress wa gov/lni/wagelookup/prvWagelookup aspx 11/8/2013
II'
I'
�
I�
�
�
'
I
��
��
r
� ,
,
,
�
�
�
'
i
I �
'
�
'
Kitsap Laborers
K�tsap Laborers
K�tsap Laborers
, Kitsap Labarers
�Kitsap Laborers
�K�tsap Laborers
� K�tsap Laborers
K�tsap Laborers
K�tsap Laborers
�K�tsap Laborers
K�tsap Laborers
� K�tsap Labarers
K�tsap Laborers
K�tsap �aborers
; K�tsap Labor�rs
� K�tsap Laborers
� K�tsap Laborers
K�tsap Laborers
K�tsap Laborers
Kitsap L.aborers
�
� K�tsap Laborers
Kitsap Laborers
�
;Krtsap Laborers
K�tsap Labarers
Kitsap Laborers
�Kitsap Laborers
K�tsap Laborers
Kitsap Labarers
°Kitsap Laborers
� Kitsap Laborers
Kitsap Laborers
�Kitsap Laborers
Kitsap Labarers
Kitsap Laborers
K�tsap Labarers
P�pe Wrapper �41.46 iA
PotTender $41.69 7A
Powderman $42 99 7A
Powderman's Helper $41.69 7A
Power Jacks $42.46 7A
Railroad Spike Puller - Power $42 46 7A
Raker - Asphalt $42.99 7A
Re-timberman $42 99 7A
Remote Equ�pment Operator $42.46 7A
R�gger/signal Person $42.46 7A
R�p Rap Person $41.69 7A
R�vet Buster $42 46 7A
Rodder $42.46 7A
Scaffold Erector $41 69 7A
Scale Person $41.69 7A
Sloper (over 20") $42 46 7A
Sloper Sprayer $41 69 7A
Spreader(concrete) $42 46 7A
Stake Hopper $41 69 7A
Stock Piler $41 69 7A
Tamper £t S�m�lar Electnc, Air $42.46 7A
�t Gas Operated Tools
Tamper (mult�ple ft Self- $42.46 7A
propelled)
T�mber Person - Sewer (lag�er, $42.46 7A
Shorer £t Cnbber)
Toolroom Person (at Jobsite) $41.69 7A
Topper $41 69 7A
Track Laborer $41.69 7A
Track L�ner (power) $42 46 7A
Traff�c Control Laborer $37 79 7A
Traff�c Control Supernsor $37 79 7A
Truck Spotter $41 69 7A
Tugger Operator $42.46 7A
Tunnel Work-Compressed Air $60 06 7A
Worker 0-30 psi
Tunnel Work-Compressed Air $65.09 7A
Worker 30 01-44 00 ps�
Tunnel Work-Compressed A�r $68.77 7A
Worker 44.01-54.00 ps�
Tunnel Work-Compressed Air $74.47 7A
Worker 54 01-60 00 ps�
Tunnel Work-Compressed Air $76.59 7A
Worker 60 01-64 00 psi
Tunnel Work-Compressed Air $81 69 7A
Worker 64.01-68.00 psi
httns //fortress wa �ov/Iru/wagelookup/prvWagelookup aspx
Page 5 of 17
2Y
2Y
2Y
2Y �
2Y
2Y
2Y
2Y �
2Y
2Y
2Y
2Y
2Y
2Y
2Y
�
�
2Y
2Y k
2Y s
2Y � '
2Y °
2Y �
2Y �
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
8R
8R
� �
�
�
�
E
� �
�
11/8/2013
Page 6 of 17
Kitsap
t Kitsap
� K�tsap
K�tsap
�
K�tsap
� K�tsap
Tunnel Work-Compressed Air
Worker 68.01-70.00 psi
Tunnel Work-Compressed A�r
Worker 70.01-72.00 psi
Tunnel Work-Compressed A�r
Worker 72.01-74.00 ps�
Tunnel Work-Guage and Lock
Tender
Tunnel Work-Miner
V�brator
Vmyl Seame�
Watchman
Welder
Well Point Laborer
Window Washer/cleaner
General Laborer ft Topman
$83.59 7A
$85.59 7A
$87.59 7A
$43.09 7A
$43 09 7A
$42.46 7A
$41 69 7A
$32.12 7A
$42.46 7A
$42 46 7A
$32 12 7A
$41.69 7A
$42.46 7A
$9.25
$10.05
$12.92
$21.00
$50 12 5A
$26.96
$9.19
$13 83
$13.83
$44.89
$11.56
$11.56
$11.56
$11.56 �
$9.40
$11.56
$11.56
$11.56
$36.64 6Z
$51.07 5D
$49.29 7�
$9.19
$61.57 5A
2Y
1H
1H
2Y
2Y
�
�
� >
�
Ki
Kt
K�tsap Laborers
�K�tsap Laborers - Under��ound
� Ft Water
Kitsap Laborers - Under�round
£� Water
�Kitsap Landscape Construction
�
K�tsap Landscape Construct�on
u K�tsap Landsca�e Construction
�
�Kitsap Lathers
P�pe Layer
Irngation Or Lawn Spnnkler
Installers
Landscape Equ�pment
Operators Or Truck Dnvers
Landscap�ng Or Plantmg
Laborers
JOURNEY LEVEL
Journev Level
K�tsap i�Aetal Fabr�catian (In Shop) F�tter
\ K�tsap Metal Fabncat�on (In Shopl Laborer
jK�tsap Metat Fabncation �ln Sho[�) MacMne Operator
�K�tsap Metal Fabr�cation (In Shop) Welder
'K�tsap Mittwn�ht Journey Level
K�tsap Modular Buildm�s Cab�net Assembly
�K�tsap Modutar Bu�ldmQS Electnaan
�Kitsap Moduiar Buitd�n�s Equ�pment Maintenance
K�tsap Modutar Build�nQS Plumber
yK�tsap Modular Bu�ldmQS Product�on Worker
�K�tsap Modular Bu�ldm�s Tool Ma�ntenance
�K�tcwn Mnciular Bu�td�n�s Ut�lttY Pet'SOn
�^-r
K�tsap Pa�nters
K�tsap P�Ee Dnver
�Kitsap Plasterers
° K�tsap Pta�, rounc
Instatters
�K�tsap Plumbers f
Level
Level
Level
Level
Level
https //foriress wa gov/lru/wagelookup/prvWagelookup aspx
1Y '
2Y
2Y
2Y �
�
2Y
2Y
2Y
1
1
1
�
�
1M
1
1 �
1 �
1 <
1 `
1
1
1
1
1
2B
�
i
1
11 /8/2013
Page 7 of 17
'
�
'
'
'
,
'
,
'
�
'
,
,
'
'
�
'
,
'
Kitsap Power Eau�pment Operators Asphalt Plant Operators $53 49 7A
Kitsap Power Epu�pmer�t Operators Assistant Engineer $50.22 7A
Kitsap Power Eau�prr�ent Operators Barner Mach�ne (rpper) $53.00 7A
� Kitsap Power Equ� ment C3peratars Batch Plant Operator, $53 00 7A
� Concrete
�K�tsap Prawer Equ�[�ment Operators Bobcat $50.22 7A
FK�tsap Power Eau�t�ment Operators Brokk - Remote Demol�t�on $50 22 7A
Equipment
�K�tsap Power EQU�prment Operators Brooms $50 22 7A
K�tsap Power Equ�pment Operatars Bump Cutter $53.00 7A
�Kitsap Power Epu�prr�enfi O�erators Cableways $53 49 7A
�K�tsap Power Equ��rr�ent C?perators Ch�pper $53 00 7A
r
�K�tsap Power Eaurpment Operators Compressor $50 22 7A
>Kitsap Power Equ��menfi C}perators Concrete Pump• Truck Mount $53.49 7A
With Boom Attachment Over 42
M
� Kitsap Power E uipment O�rerators Concrete F�msh Mach�ne -laser $50 22 7A
Screed
�Kitsap Power Epuipment Operatars Concrete Pump - Mounted Or $52 58 7A
Tra�ler High Pressure L�ne
Pump, Pump H�gh Pressure.
K�tsap Power Eau�pment (3perators Concrete Pump: Truck Mount $53 00 7A
W�th Boom Attachment Up To
42m
aK�tsap Power Equ�r�ment Operators Conveyors $52 58 7A
K�tsap Power Equ�pment 0 erp ators Cranes. 20 Tons Through 44 $53 00 7A
Tons W�th Attachments
F Kitsap Power Epu�pment Operators Cranes: 100 Tons Through 199 $54 04 7A
° Tons, Or 150' Of Boom
' (Includ�ng J�b Wrth
�
Attachments)
K�tsap Power Eau�pment Operatars Cranes: 200 Tons To 300 Tons, $54.61 7A
Or 250' Of Boom (including J�b
� With Attachments)
'K�tsap Power Eau�t�ment �perators Cranes• 45 Tons Through 99 $53.49 7A
� Tons, Under 150' Of Boom
(including J�b Wrth
Attachments)
�K�tsap Pawer Equ�pment Operatars Cranes: A-frame - 10 Tons And $50.22 7A
Under
Kitsap Power Eau�pment Operators Cranes Fnction 100 Tons $54.61 7A
Through 199 Tons
f K�tsap Pawer Equ�pment �perators Cranes• Fnction Over 200 Tons $55 17 7A
� K�tsap Power Epu�oment Or�eraCors Cranes Over 300 Tons Or 300' $55.17 7A
F Of Boom (includ�ng J�b W�th
Attachments)
= Kitsap Power Equ�pment Operators Cranes• Through 19 Tons W�th $52.58 7A
Attachments A-frame Over 10
� Tons
�Kitcan Pnwer Ea���r�ment ODerators Crusher $53.00 7A
https.//fortress wa gov/liu/wagelookup/prvWagelookup aspx
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
8P �
8P
8P
8P ;
8P �
8P
�
8P `
8P �
8P �
�
8P
8P
8P
8P
8P
�
8P �
3C 8P =
3C 8P = -
3C 8P �
3C 8P �
3C 8P �
�
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C � 8P
11/8/2013
Page 8 of 17
K�tsap �Power Equipment 0 erp ators
K�tsap
�Krtsap
Kitsap
K�tsap
K�tsap
K�tsap
K�tsap
K�tsap
K�tsap
a K�tsap
� K�tsap
K�tsap
�
K�tsap Power Equ�pment O�erators
�
�Kitsap Power Epu�pment Operators
K�tsap
K�tsap Power Eau�pmer�t Operators
� Kitsap Power Equi�ment Operators
�Kitsap Power Equ��ment OQerators
K�tsap Power Equ�pment Operators
K�tsap Power Equ�pment Operators
K�tsap Power Equipment Operators
`K�tsap Pawer Eq,ui,�rnent Operators
K�tsap
K�tsap
K�tsap
K�tsap
K�tsap
Deck Eng�neer/deck Winches $53 00
(power)
Derncks, On Bu�ld�ng Work $53.49
Dozers D-9 &t Under $52 58
Dnll O�lers: Auger Type, Truck $52 58
Or Crane Mount
Dnll�ng Mach�ne $53 00
Elevator And Man-lift. $50.22
Permanent And Shaft Type
F�msh�ng Mach�ne, B�dwell And $53.00
Gamaco £t Similar Equipment
Forkl�ft. 3000 Lbs And Over $52 58
W�th Attachments
Forkl�fts: Under 3000 Lbs. With $50 22
Attachments
Grade Eng�neer: Us�ng Blue $53.00
Pnnts, Cut Sheets, Etc
Gradechecker/stakeman $50.22
Guardra�l Punch $53.00
Hard Ta�t End Dump $53.49
Art�culat�ng Off- Road
Equipment 45 Yards £t Over
Hard Ta�l End Dump
Art�culatmg Off-road
Equ�pment Under 45 Yards
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
$53.00� 7A
Honzontal/d�rectional Dnll $52.58
Locator
Honzontal/d�rect�onal Dnll $53.00
Operator
Hydral�fts/boom Trucks Over $52.58
10 Tons
Hydralifts/boom Trucks, 10 $50.22
Tons And Under
Loader, Overhead 8 Yards. ft $54.04
Over
Loader, Overhead, 6 Yards. But $53.49
Not Includ�ng 8 Yards
Loaders, Overhead Under 6 $53.00
Yards
Loaders, Plant Feed $53.00
Loaders Elevating Type Bett $52.58
Locomotrves, All $53.00
Matenal Transfer Dev�ce $53 00
Mecharncs, All (leadmen - $54.04
$0.50 Per Hour Over Mechamc)
Motor Patrol Grader - Non- $52.58
fimsh�ng
Motor Patrol Graders, Fimshing $53.49
Muck�ng Machme, Mole, Tunnel $53.49
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
3C
3C
3C
3C
3C
3C
3C
3C
3C
�
8P
gp E
8P =
8P �
8P
�
8P
8P
�
8P
8P �
�
3C 8P
3C 8P
3C 8P �
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
8P �
8P '
8P
8P
8P '
8P
8P �
8P
8P
8P '
_ �
8P
8P
8P
Y
https•//fortress wa gov/lru/wagelookup/prvWagelookup aspx 11/8/2013
,
�
'
,
'
'
,
'
,
1
'
�
�
�
�
�
�
'
'
I
Dnll, Bonng, Road Header
And/or Sh�eld
K�tsap Pawer Eau��ment Operators O�l Distnbutors, Blower $50 22 7A
D�stnbution �t Mulch Seeding
�Krtsap Power Equ�pment Operators
zK�tsap Power Equ�pment Ot�erators
'Kitsap Power Er�u�pment Uperators
�
Kitsap Power Eq,u�pment O�erators
� K�tsap
Kitsaa
� K�tsap
� K�tsap
$ Kitsap
� K�tsap
Kitsap IPower Equ�r�ment Operators
�
Outside Ho�sts (elevators And $52.58 7A
Manlifts), A�r Tuggers,strato
Overhead, Bndge Type Crane• $53 00 7A
20 Tons Through 44 Tons
Overhead, Bndge Type 100 $54.04 7A
TonsAnd Over
Overhead, Bndge Type• 45 $53.49 7A
Tons Through 99 Tons
Pavement Breaker $50 22 7A
P�le Dnver (other Than Crane $53.00 7A
Mount)
Plant O�ler - Asphalt, Crusher $52.58 7A
Posthole D�gger, Mecharncal $50.22 7A
Power Plant $50 22 7A
Pumps - Water $50 22 7A
Quad 9, Hd 41, D10 And Over $53.49 7A
Quuk Tower - No Cab, Under $50.22 7A
100 Feet In He�ght Based To
Boom
Remote Control Operator On $53.49 7A
Rubber Tired Earth Mov�ng
Kitsap Power Equipment Uperators
Krtsap Pawer Eauapment O�erators
� K�tsap Power Eaupment Operators
K�tsap Power Ec�ui�ment C�perators
K�tsap
Kitsap
� K�tsap
� Kitsap
� Krtsap
� K�tsap
Kitsap
K�tsap
�
� K�tsap
R�gger And Bellman $50.22 7A
Rollagon $53.49 7A
Roller, Other Than Plant M�x $50 22 7A
Roller, Plant Mix Or Multi-lift $52.58 7A
Matenals
Roto-m�ll, Roto-gnnder $53.00 7A
Saws - Concrete $52.58 7A
Scraper, Self Propelled Under $53.00 7A
45 Yards
Scrapers - Concrete ft Carry All $52.58 7A
Scrapers, Self-propelled• 45 $53 49 7A
Yards And Over
Service Eng�neers - Equ�pment $52.58 7A
Shotcrete/gumte Equ�pment S50.22 7A
Shovel, Excavator, Backhoe, $52 58 7A
Tractors Under 15 Metnc Tons.
Shovel, Excavator, Backhoe• $53.49 7A
Over 30 Metnc Tons To 50
Metnc Tons
Shovel, Excavator, Backhoes, $53.00 7A
Tractors. 15 To 30 Metnc Tons
httns //fortress wa �ov/lru/wa�elookup/prvWagelookup aspx
Page 9 of 17
3C � 8P
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
8P
— �
8P
�
8P $
8P �
8P
8P
8P `
8P
8P
8P
8P ,
8P �
8P r
8P
�
8P
8P
8P r
8P �
8P
t
8P
8P
8P
8P �
8P
11/8/2013
� Kitsap
5
Kitsap
K�tsap
K�tsap
K�tsap
K�tsap
Kitsap
Kitsap
;
Kitsap
� Kitsap
K�tsap �Power Ec�u�pr�er�t Operatars
Kitsap �Power Equ�pment Operators
Kitsap
' Kitsap
K�tsap
K�tsap
Kitsap
�
� K�tsap
K�tsap
Shovel, Excavator, Backhoes•
Over 50 Metnc Tons To 90
Metnc Tons
$54.04 � 7A
Shovel, Excavator, Backhoes $54 61
Over 90 Metnc Tons
Sl�pform Pavers $53.49
Spreader, Tops�der £t $53.49
Screedman
Subgrader Tnmmer $53.00
Tower Bucket Elevators $52.58
Tower Crane Over 175'm $54 61
He�ght, Base To Boom
Tower Crane Up To 175' In $54.04
He�ght Base To Boom
Transporters, All Track Or $53 49
Truck Type
Trench�ng Machines $52.58
Truck Crane Oiler/dnver - 100 $53.00
Tons And Over
Truck Crane Oiter/dnver Under $52.58
100 Tons
Truck Mount Portable Conveyor $53.00
Welder $53.49
Wheel Tractors, Farmall Type $50.22
Yo Yo Pay Dozer $53.00
Asphalt Plant Operators $53.49
_ Ass�stant Engineer $50.22
_ Barner Machine (rpper) $53.00
_ Batch Plant Operator, $53.00
� Concrete
_ Bobcat $50.22
_ Brokk - Remote Demolit�on $50 22
� Equipment
_ Brooms $50.22
Kitsap Pawer E ui mer�t 0 eratars- Bump Cutter $53.00
Under�round Sewer &t Water
�Kitsap Power E ui ment Q erators- Cableways $53 49
� Under�round Sewer &t Water
�Kitsap Power Equ�pment Operatars- Chipper $53 00
Underground Sewer � Wa�er
, Kitsap Power Eau��ment Operators- Compressor $50.22
Underground 5ewer &r. Water
Kitsap Power Equipment Operators- Concrete Pump. Truck Mount $53.49
Under�round__Sewer Fx Water W�th Boom Attachment Over 42
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
Page 10 of 17
3C I 8P �
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
8P
8P �
8P
8P
8P �
8P
8P
8P
8P
8P
8P
oe >
8P
8P
�
8P
8P
�
8P �
�
8P '
8P
y
8P
8P
8P �
8P �
8P k
�
8P �
https //fortress wa gov/lru/wagelookup/prvWagelookup aspx 11/8/2013
'
'
'
,
'
,
�
'
'
,
'
�
'
'
'
'
'
'
'
K�tsap Power E ui ment O erators-
Underground Sewer £t Water
Kitsap Pawer Equa[�ment Operators-
� Underground Sewer � Water
Kitsap Powe� Epuipment Operators-
n Underg,round Sewer � Water
a
K�tsap Power Equ�pment Operators-
` Under�round Sewer �. Water
K�tsap Pawer £qu��ment O�erators-
� Under�round Sewer £� Water
K�tsap Pawer Equiprr�ent Operators-
Under�round Sewer �t Water
Kitsap
K�tsap
� Kitsap
K�tsap
�
; Krtsap
K�tsap �Power Equ�pment Operators-
Krtsap �Power Ec�pment Operators-
Kitsap
F K�tsap
� K�tsap
;
K�tsap
K�tsap
�
K�tsap
K�tsap
K�tsap
Concrete F�rnsh Mach�ne -laser $50 22 7A
Screed
Concrete Pump - Mounted Or $52 58 7A
Tra�ler High Pressure Line
Pump, Pump High Pressure.
Concrete Pump: Truck Mount $53.00 7A
W�th Boom Attachment Up To
42m
Conveyors $52.58 7A
Cranes: 20 Tons Through 44 $53.00 7A
Tons With Attachments
Cranes: 100 Tons Through 199 $54.04 7A
Tons, Or 150' Of Boom
(tncluding J�b With
Attachments)
Cranes. 200 Tons To 300 Tons, $54.61 7A
Or 250' Of Boom (�nclud�ng J�b
W�th Attachments)
Cranes: 45 Tons Through 99 $53 49 7A
Tons, Under 150' Of Boom
(includ�ng J�b W�th
Attachments)
Cranes• A-frame - 10 Tons And $50 22 7A
Under
Cranes Fnction 100 Tons $54.61 7A
Through 199 Tons
Cranes. Fnct�on Over 200 Tons $55 17 7A
Cranes: Over 300 Tons Or 300' $55.17 7A
Of Boom (mdud�ng Jib Wrth
Attachments)
Cranes: Through 19 Tons With $52 58 7A
Attachments A-frame Over 10
Crusher $53 00 7A
Deck Eng�neer/deck W�nches $53 00 7A
(power)
Derncks, On Bu�ldmg Work $53.49 7A
Dozers D-9 � Under $52.58 7A
Dntl O�lers: Auger Type, Truck $52.58 7A
Or Crane Mount
Dniting Mach�ne $53 00 7A
Elevator And Man-lift• $50 22 7A
Permanent And Shaft Type
F�msh�ng Mach�ne, Bidwell And $53.00 7A
https //fortress wa gov/lru/wagelookup/prvWagelookup aspx
Page 11 of 17
3C
3C
�
8P �
�
8P
3C � 8P '
3C
3C
3C
8P
8P
8P �
�
3C � 8P
3C
�
8P '
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
8P �
8P t
�
8P
8P
�
8P
8P
8P
8P ,
8P
8P �
8P
8P
E
8P '
— �
11 /8/2013
Page 12 of 17
Underground Sewer 6t Water Gamaco �t Sim�lar Equ�pment
K�tsap Power Equ�pmer�t O�erators- Forkltft: 3000 Lbs And Over $52.58
Underuround Sewer £x Water W�th Attachments
K�tsap Power Equ�prnent Operatt�rs- Forkl�fts: Under 3000 Lbs With $50.22
Underground Sewer � Wa��r Attachments
Kitsap Power Eq,ui .Lment Operators- Grade Engineer. Us�ng Blue $53 00
Under�round 5ewer & Water Pnnts, Cut Sheets, Etc
K�tsap Power E�au�pment Operators- Gradechecker/stakeman $50 22
Under�round Sewer �t Water
K�tsap Pawer Equ�pment Operators- Guardra�l Punch $53 00
Under �round Sewer &c Water
K�tsap Power Eauipment Operators- Hard Ta�l End Dump $53.49
Under round Sewer Fr Water Art�culat�ng Off- Road
Equipment 45 Yards tt Over
4K�tsap Pawer Equ��ment Operators- Hard Ta�l End Dump
Under�raund Sewer &t Water Articulatmg Off-road
� Equ�pment Under 45 Yards
7A
7A
7A
7A
7A
7A
$53.00� 7A
�K�tsap Power Equ��ment Operators- HonzontaVd�rect�onal Dnll $52.58
Under �raund Sewer £t Water Locator
K�tsap Pawer Egu�pment a�erators- HonzontaVd�rect�onal Dnll $53.00
� Underqround Sewer � Water Operator
�K�tsap Power E u�pment Operators- Hydral�fts/boom Trucks Over $52 58
Under�round Sewer Et Water 10 Tons
K�tsap Power Er�uinrrr�enC Q erators- Hydral�fts/boom Trucks, 10 $50.22
� Under�,round Sewer £c Water Tons And Under
Krtsap Pawer Ec�u�pment Operators- Loader, Overhead 8 Yards �t $54 04
Underground Sewer £t_Water Over
K�tsap Power Eaui�ment Operators- Loader, Overhead, 6 Yards But $53.49
Under�round Sewer £� Wates Not Includmg 8 Yards
�Krtsap Power Equ�pment O�erators- Loaders, Overhead Under 6 $53.00
� Under�,round Sewer �t Water Yards
�Krtsap Power,E�c uapment Operators- Loaders, Plant Feed $53.00
� UnderQround Sewer &t Water
K�tsap Power Equ�pment Operators- Loaders: Elevating Type Belt $52.58
� Ur►derground 5ewer �t Water
�K�tsap Power Eau�qment �perators- Locomotrves, All $53 00
Under�raund Sewer �t Water
K�tsap Power Equ�pment OQerators- Matenal Transfer Dev�ce $53.00
Undereround Sew�r Ft Wafer
K�tsap Power Equ�,pment Operators- Mecharncs, All (leadmen - $54.04
Under round Sewer Et Water $0.50 Per Hour Over Mechamc)
K�tsap Power Ec�u�prnent Operators- Motor Patrol Grader - Non- $52.58
r
� Underground Sewer �t Water f�mshing
�K�tsap Power Epu�ment C}perators- Motor Patrol Graders, F�msh�ng $53.49
Underground Sewer &t Water
K�tsap Power Equ��ment �perators- Mucking Mach�ne, Mole, Tunnel $53.49
� Under�rounti Sewer Ft Water Dnll, Bonng, Road Header
� And/or Shield
K�tsap Power E uipment �aerators- Oil D�stnbutors, Blower $50.22
Undereround Sewer &t Water D�stnbution �t Mulch Seedmg
.
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
8P
8P
8P ,
8P
8P
8P �
8P
8P
8P
�
8P `
8P �
8P
8P �
8P
8P
8P '
8P
8P
8P
8P
8P
8P
8P
https //fortress wa gov/lm/wagelookup/prvWagelookup aspx 11/8/2013
,
'
'
�
�
'
'
'
'
�
,
'
'
�
1
'
,
�
,
K�tsap Power Equ�pr°r�ent Operators- Outs�de Ho�sts (elevators And $52.58 7A
Under�round Sewer tx Water Manlifts), A�r Tuggers,strato
Krtsap Power Equ�pment O�erafiors- Overhead, Bndge Type Crane. $53.00 7A
Under�round Sewer ft Water 20 Tons Through 44 Tons
K�tsap Power Equ�pment a a�erators- Overhead, Bndge Type 100 $54 04 7A
; Under�round Sewer Er Water Tons And Over
�Kitsap Power EQU�pment OQerators- Overhead, Bndge Type 45 $53 49 7A
Underground Sewer 6t Water Tons Through 99 Tons
�Kitsap Power EQU�prr�ent Operators- Pavement Breaker $50.22 7A
r
� Under�round Sewer & Water
�K�tsap Power E ui rr�ent O erators- Pile Dnver (other Than Crane $53 00 7A
� Under�round Sewer Et Water Mount)
'Kitsap Pawer Equ�pment Operators- Plant Oiler - Asphalt, Crusher $52 58 7A
� Under�rnund Sewer &t Water
�K�tsap Power Eau��ment Operators- Posthole D�gger, Mechamcal $50.22 7A
' Unde�round Sewer �t Water
K�tsap Power Eau�pment t3perators- Power Plant $50.22 7A
Undereround Sewer &t Water
K�tsap Power Ec�u�pment Orrerators- Pumps - Water $50 22 7A
Under�round Sewer £t Water
�Kitsap Power Epua�ment l�perators- Quad 9, Hd 41, D10 And Over $53.49 7A
� Under�raund Sewer � Water
K�tsap Power Equ, �pme�t Operators- Quick Tower - No Cab, Under $50.22 7A
Under�round Sewer t� Water 100 Feet In He�ght Based To
� Boom
�K�tsap Power Ec�u�pment �perators- Remote Control Operator On $53 49 7A
Underaround Sewer & Water Rubber T�red Earth Moving
Equ�pment
K�tsap Power F�u�mer�t O�erators- R�gger And Bellman $50 22 7A
Under�round Sewer Ft Water
�Krtsap Power�uipment Operators- Roltagon $53 49 7A
Unde�round Sewer St Water
K�tsap Power Equ�pment Operators- Roller, Other Than Plant Mix $50 22 7A
Under�round 5evver � Water
�Kitsap Power Equ��ment Operators- Roller, Plant M�x Or Mult�-l�ft $52 58 7A
5 Under�round Sewer &t Water Matenals
Krtsap Power Eau�t�ment Operatars- Roto-m�ll, Roto-gnnder $53 00 7A
Under�round Sewer 8 Water
Kitsap Pawer Equ�pment Operators Saws - Concrete $52.58 7A
� Underground Sewer £x Water
�Kitsap Power Eau�pment Operators- Scraper, Self Propetled Under $53.00 7A
UndPrground Sewer �t Water 45 Yards
K�tsap Power Equ��ment Oaeratars- Scrapers - Concrete £t Carry All $52.58 7A
Under�round Sewer £t Water
�Kitsap Power Equ�pmer�t Operators- Scrapers, Self-propelled• 45 $53 49 7A
Under�round Sewer £z Water Yards And Over
Kitsap Power Equ�ment Operators- Sernce Engineers - Equipment $52.58 7A
� Under�round Sewer �t Water
'Kitsap Power Equ�pment Operators- Shotcrete/gumte Equ�pment $50.22 7A
https //fortress wa gov/ltu/wagelookup/prvWagelookup aspx
Page 13 of 17
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
8P °
�
8P `
8P
8P
8P ;
8P ,
8P
8P
8P
8P F
' 8P
' 8P
_ �
8P
F
8P
8P �
8P
8P
8P
8P
8P �
8P
8P
8P
8P
11/8/2013
Page 14 of 17
K�tsap Power Equ�prr�ent O�erators- Shovel , Excavator, Backhoe,
� UnderQround Sewer � Water Tractors Under 15 Metnc Tons
�K�tsap Pov�rer E u� ment 0 eratnrs- Shovel, Excavator, Backhoe
Underground Sewer �t Water Over 30 Metnc Tons To 50
� Metnc Tons
Kitsap Power Equ�pment Operators- Shovel, Excavator, Backhoes,
� Under�,round Sewer &c Water Tractors. 15 To 30 Metnc Tons
K�tsap Power E u�pment Operators- Shovel, Excavator, Backhoes•
� Under�round Sewer &t Water Over 50 Metnc Tons To 90
Metnc Tons
$52 58 7A 3C
$53 49 7A 3C
$53.00 7A 3C
$54.04 7A 3C
�K�tsap Power__Equi�ment Operators- Shovel, Excavator, Backhoes: $54.61
UnderQround Sewer 8 Water Over 90 Metnc Tons
K�tsap Power Equipment Operators- Sl�pform Pavers $53.49
Under�round Sewer £t Water
\ K�tsap Power E�pment Operators- Spreader, Tops�der �t $53.49
, Undereround Sewer £� Water Screedman
�K�tsap Power Equipment Operators- Subgrader Tnmmer $53 00
Under�round Sewer £t Water
K�tsap Power Ecru�pmenfi Operators- Tower Bucket Elevators $52.58
` Under�round Sewer �. Water
K�tsap Power Equ��ment C}perators- Tower Crane Over 175'in $54 61
Under�round Sewer Et Wa�er He�ght, Base To Boom
�Krtsap Power Ec�uipment Operators- �ower Crane Up To 175' In $54.04
� Under$round Sewer £t Water He�ght Base To Boom
K�tsap Power Eau�[�ment Operators- Transporters, All Track Or $53 49
Under�round Sewer �t Wafier Truck Type
K�tsap Power Equ��ment Oaerators- Trenchmg Machmes $52.58
Under�round 5ewer Et Water
Kitsap Pawer Equ�pment Operators- Truck Crane O�ler/dnver - 100 $53.00
UnderQround Sewer �t Water Tons And Over
� Kitsap Power E u� ment 0 erators- Truck Crane Oiler/dnver Under $52 58
� Under�round Sewer £t Water 100 Tons
;Kitsap Power Equ�pment Operators- Truck Mount Portable Conveyor $53 00
Under�round 5ewer £� Water
K�tsap Power Equ�pment Operators- Welder $53.49
Underground Sewer & V3later
Kitsap Pawer Equipmer�t Operators- Wheel Tractors, Farmall Type $50.22
Under round 5ewer Ft Water
� K�tsap Pawer Epu�pment Operators- Yo Yo Pay Dozer $53.00
Under�round Sewer Et Water
Kitsap Power L�ne Clearance Tree Journey Level In Charge $43.76
� Tnmmers
�Kitsap Power L�ne C[earance °free Spray Person $41.51
� Tnmmers
'Kitsap Power L�ne CEearance Tree Tree Equipment Operator $43.76
Tnmmers
Kitsap Power L�ne Clearance Tree Tree Tnmmer $39 10
Tnmmers
'Kitsap Power L�ne CCearance Tree Tree Tnmmer Groundperson $29 44
https //fortress wa gov/lru/wagelookup/prvWagelookup aspx
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
7A
5A
5A
5A
5A
5A
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
4A
4A
4A
4A
4A
8P
SP
8P
�
8P `
�
8P
8P
8P
8P
�
8P
8P �
8P
�
8P ,
8P
8P �
8P
8P
8P
8P �
k
8P
i
11/8/2013
'
'
,
,
'
1
'
'
'
'
'
'
'
1
'
,
'
,
�
� Tnmmers
Kitsap Refngerat�on Et Air
� Condrt�omnQ Mecharncs
�K�tsap Res�dentiat Bnck Mason
� Kitsap Res�dent�at Carpenters
K�tsap Res�dent�al Cement Mason,
Krtsap Res�dent�at Dr�watl Appl�c�
� Kitsap Res�dent�al Drvwatt Tapers
�Kitsap Resident�al Electnaans
�Kitsap Res�dentiat Glaz�ers
�K�tsap Res�dent�at Insutat�on
Appticators
�K�tsap Res�dential Laborers
�Kitsap Res�dent�at Marble Setters
,K�tsap Res�denhaf Pa�nters
K�tsap Res�dent�al Ptumbers �t
Pipefitters
;K�tsap Res�dentiat Refn�eration F
Condrt�omn� Mechamcs
�K�tsap Res�dent�at Sheet Metal
Workers
'Kitsap Res�dent�al Soft Fioor Lave
Kttsap Res�dent�at Spnnkter F�tte
K�tsap
� Krtsap
�
^ Krtsap
� K�tsap
K�tsap
� Ki tsap
K�tsap
r K�tsap
� K�tsap
� K�tsap
' K�tsap
� K�tsap
� `Kitsap
K�tsap
�K�tsap �S��n Makers &t instatlers
Mecharnc $61.57 5A
Journey Level $17 04
Journey Level $39 62 5D
Journey Level $30.87
Journey Levet $39.62 5D
Journey Level $20.00
Journey Level $27 00
Journey Level $53 76 7L
Journey Level $13.96
Journey Level $16 89
Journey Level $17 04
Journey Level $19 52
Journey Level $21.11
Journey Level $17.64
Journey Level (F�eld or Shop) $28 95
Journey Level $19.38
Journey Level $27.74
Journey Level $50.12 5A
Journey Level $9.19
Journey Level $30.26
Journey Level $31 14
Journey Level $44.21 5A
Using Irntable B�tum�nous $47.21 5A
Matenals
Journey Levet (F�eld or Shop) $69 37 7F
CARPENTER $19.29
ELECTRICIAN $25 53
Heat �t Frost Insulator $58.93 5J
Laborer $19.64
MACHINIST $19.29
jOPERATOR $19.44
'Painter $36 64 6Z
PIPEFITTER $19.29
RIGGER $19 29
Sheet Metal $22 21
ISHIPFITTER $19.29
WELDER/BURNER $19.29
Journey Level $20.58
https•//fortress wa gov/lni/wagelookup/prvWagelookup aspx
Page 15 of 17
�
1G f
1
A�1 r
1M
1
1
1Y
1
1
1
1
1
1
1
1
1
�
_ �
f
1M �
1 � �
1 ,
�
1 �
1R �
1R �
1
1
1S
1
1
1
26
1
1
1
1
1
1
F
�
�
11 /8/2013
Page 16 of 17
� (ElectncaU
K�tsap S�n Makers £t insfialters fNon- Journey Level S9•27
ElectncaU
�K�tsap Soft Floor Layers Journey Level $42.15
K�tsap Sotar Controls For W�ndows Journey Level $10.31
QK�tsap Spnnkler Fitters (Fare Journey Level $69.59
Protect�on)
K�tsap Stage R��,�nQ Mecharncs (Non Journey Level $13.23
� Structurat)
K�tsap Stone Masons Journey Level $50.12
�K�tsap Street And Park�ng Lot Journey Level $16.00
� Sweeper Workers
Kitsap Survevors Ass�stant Construction S�te $52.58
Surveyor
K�tsap Survevors Cha�nman $52.06
=K�tsap Surveyors Construct�on Site Surveyor $53.49
\ K�tsap Tetecommumcataon Journey Level $39.57
Techmc�ans
K�tsap Tetephone L�ne Constructian - Cable Spluer $36.01
' Outs�de
K�tsap Telephone L�ne Construct�on - Hole D�gger/Ground Person $20.05
� Outs�de
�K�tsap Tetephone Line Construct�an - Installer (Repairer) $34 50
Outs�de
K�tsap Tetephone L�ne Constructaon - Spec�al Aparatus Installer I $36.01
Outs�de
'�K�tsap Teteahone Line Construct�on - Speaal Apparatus Installer II $35.27
� Outs�de
Kitsap Tete�hone L�ne Construct�on - Telephone Equ�pment Operator $36.01
Outs�de (Heavy)
K�tsap Tetephone L�ne Construction - Telephone Equ�pment Operator $33 47
Outs�de (L�ght)
K�tsap Tetephone L�ne Construct�on - Telephone Lineperson $33.47
Outs�de
K�tsap Tetephone L�ne Construct�on - Telev�s�on Groundperson $19 04
Outs�de
�Kitsap Telephone Line Construct�on - Telev�s�on Lineperson/Installer $25.27
� Outside
'K�tsap Tetephone L�ne Construct�on - Television System Techmcian $30 20
Outs�de
`K�tsap Tetephone L�ne Construct�on - Televis�on Techmc�an $27 09
Outs�de
K�tsap Tete�hone L�ne Construct�on - Tree Tnmmer $33.47
Duts�de
�K�tsap Terrazzo Workers Joumey Level $46.96
�K�tsap Tite Setters Journey Level $46.96
Kitsap T�le. Marble £t Terrazzo Journey Level $12 00
F�mshers
�K�tsap Traffic Controt Stnpers Journey Level $42.33
5C
1
3D
1
1X
1
R
.�
https //fortress wa.gov/lni/wagelookup/prvWagelookup.aspx
5A
7A
7A
7A
7E
5A
5A
5A
5A
5A
5A
5A
5A
5A
5A
5A
5A
5A
5A
�
(
1 `
_ �
3C 8P
3C 8P �
1E
26
26
26
26
26
26
26
2B
2B
26
2B
2B
2B
1M
�
�
3
1
1K
11 /8/2013
'
'
'
�
'
'
�
'
'
'
�
,
�
�
'
,
'
'
'
= Kitsap Truck �nvers Asphalt M�x Over 16 Yards (W $47 91 5D
WA-Jo�nt Counal 28)
Kitsap Truck Dnvers Asphalt M�x To 16 Yards (W. $47.07 5D
WA-Jo�nt Counc�l 28)
�Kitsap Truck Dnvers Dump Truck $19.60
�Kitsap Truck �nvers Dump Truck And Tra�ler $19.60
�K�tsap Truck Dnvers Other Trucks $18.37
�K�tsap Truck �rivers Transit Mixer $20 79
�K�tsap Well Dntlers Et irn�attan Pump Imgat�on Pump Installer $13.17
� Instalters
Kitsap Wetl Dniters Ft irn�at�an Pump O�ler $14 08
instalters
K�tsap Well Dntters �t Irn�at�on Pump Well Dnller $14 40
Instalters
https //fortress wa gov/lni/wagelookup/prvWagelookup aspx
Page 17 of 17
3A
3A
1
1
1
1
1
1
8L
8L
�
11/8/2013
'
�
'
r
'
�
'
'
�
,
.�
'J
Washington State Department of Labor and Industries
Policy Statement
(Regarding the Production of "Standard" or "Non-standard" Items)
Below is the department's (State L&I's) list of criteria to be used in determming whether a
prefabricated item is "standard" or "non-standard" For items not appearmg on
WSDOT's predetermined list, these cntena shall be used by the Contractor (and the
Contractor's subcontractors, agents to subcontractors, suppliers, manufacturers, and
fabricators) to determine coverage under RCW 39 12 The production, in the State of
Washington, of non-standard items is covered by RCW 39 12, and the production of
standard items is not The production of any item outside the State of Washington is not
covered by RCW 39 12
1 Is the item fabricated for a public works pro�ect? If not, it is not sub�ect to RCW
39 12 If it is, go to question 2
2 Is the item fabricated on the public works �obsite� If it is, the work is covered under
RCW 39 12 If not, go to question 3
3 Is the item fabricated in an assembly/fabncation plant set up for, and dedicated
primarily to, the public works pro�ect� If it is, the work is covered by RCW 39 12 If not,
go to question 4
4 Does the item require any assembly, cutting, modification or other fabr�cation by the
supplier'� If not, the work is not covered by RCW 39 12 If yes, go to question 5
5 Is the prefabricated item intended for the public works pro�ect typically an inventory
item which could reasonably be sold on the general market� If not, the work is covered
by RCW 39 12 If yes, go to question 6
6 Does the specific prefabricated item, generally defined as standard, have any
� unusual characteristics such as shape, type of material, strength requirements, finish,
etc� If yes, the work is covered under RCW 39 12
, Any firm with questions regarding the policy, WSDOT's Predetermined List, or for
determinations of covered and non-covered workers shall be directed to State L&I at
(360) 902-5330
�
'
�
'
'
��
Supplemental to Wage Rates
08/31/2013 Edition, Published August 1st, 2013
�
WSDOT's
Predetermined List for
Suppliers - Manufactures - Fabricator
Below is a iist of potent�ally prefabricated items, originally furnished by WSDOT to
Washington State Department of Labor and Industries, that may be considered non-
standard and therefore covered by the prevading wage law, RCW 39 12 Items marked
with an X m the "YES" column should be considered to be non-standard and therefore
covered by RCW 39 12 Items marked with an X in the "NO" column should be
considered to be standard and therefore not covered Of course, exceptions to this
general list may occur, and in that case shall be evaluated according to the criteria
descnbed in State and L&I's policy statement
ITEM DESCRIPYION YES NO
� Metal rectangular frames, solid metal covers, hernngbone grates,
and brdirectional vaned grates for Catch Basm
Types 1, 1 L, 1 P, and 2 and Concrete Inlets See Std Plans
2 Metal circular frames (rmgs) and covers, circu�ar grates,
and prefabricated ladders for Manhole Types 1, 2, and 3
Drywell Types 1, 2, and 3 and Catch Basin Type 2
See Std Plans
3 Prefabncated steel grate supports and welded grates,
metal frames and dual vaned grates, and Type 1, 2, and
3 structural tubing grates for Drop Inlets See Std Plans
4 Concrete Pipe - Plain Concrete pipe and reinforced
concrete pipe Class 2 to 5 sizes smaller than 60 inch diameter
5 Concrete Pipe - Plain Concrete pipe and reinforced
concrete pipe Class 2 to 5 siies larger than 60 inch diameter
6 Corrugated Steel Pipe - Steel lock seam corrugated
pipe for culverts and storm sewers, sizes 30 inch
to 120 inches in diameter May also be treated, 1 thru 5
7 Corrugated Aluminum Pipe - Aluminum lock seam corrugated pipe
for culverts and storm sewers, sizes 30 inch to 120 inches in
diameter May also be treated, #5
Supplemental to Wage Rates
08/31/2013 Edition, Published August 1st, 2013
�
,
f �
r—
�
�
�
�
�
�
i
� �
� �
�
i �
I
i �
�
,
�
r
�
'
�
�J
�
;-J
�
'
L�
�
'
'
'
1–,
�
'
'
�
�
'
�
�
�
�
�
�
'
'
�
�
,
r
r
'
ITEM DESCRIPTION YES NO
8 Anchor Bolts & Nuts - Anchor Bolts and Nuts, for
mounting sign structures, lummanes and other items, shall be
made from commercial bolt stock
See Contract Plans and Std Plans for size and material type
9 Aluminum Pedestrian Handrail - Pedestrian handrail
conforming to the type and matenal,specifications set forth in the
contract plans Welding of aluminum shall be
in accordance with Section 9-28 14(3)
10 MaJor Structural Steel Fabncation - Fabrication of ma�or steel
items such as trusses, beams, girders, etc , for bndges
11 Minor Structural Steel Fabncation - Fabrication of minor steel
Items such as special hangers, brackets, access doors for
structures, access ladders for irrigation boxes, bridge expansion
�oint systems, etc , mvolvmg weldmg, cutting, punchmg and/or
bormg of holes See Contact Plans for item description and shop
drawings
12 Alummum Bndge Railing Type BP - Metal bridge railing
conforming to the type and material specifications set forth
m the Contract Plans Welding of aluminum shall be in
accordance with Section 9-28 14(3)
13 Concrete Piling--Precast-Prestressed concrete pdmg for use as 55
and 70 ton concrete piling Concrete to conform to
Section 9-19 1 of Std Spec
14 Precast Manhole Types 1, Z, and "3 with cones,
sections and flat top slabs See Std Plans
15 Precast Drywell Types 1, 2, and with cones and ad�ustment
Sections
See Std Plans
16 Precast Catch Basin - Catch Basin type 1, 1 L, 1 P, and 2
With ad�ustment sections See Std Plans
Supplemental to Wage Rates
08/31/2013 Edition, Published August 1st, 2013
�
�
�
x
� -
�
�
�
�
3
,_
ITEM DESCRIPTION YES NO
17 Precast Concrete Inlet - with ad�ustment sections,
See Std Plans
18 Precast Drop Inlet Type 1 and 2 with metal grate supports
See Std Plans
19 Precast Grate Inlet Type 2 with extension and top units
See Std Plans
20 Metal frames, vaned grates, and hoods for Combination
Inlets See Std Plans
21 Precast Concrete Utility Vaults - Precast Concrete utdity vaults
various sizes Used for in ground storage of utdity facilities and
controls See Contract Plans for size and construction
requirements Shop drawings are to be provided for approval
prior to casting
22 Vault Risers - For use with Valve Vaults and Utilities
Vaults
23 Valve Vault - For use with underground utilities
See Contract Plans for details
24 Precast Concrete Barrier - Precast Concrete Barner for
use as new barrier or may also be used as Temporary Concrete
Barrier Only new state approved barrier may be used as
permanent barrier
25 Reinforced Earth Wall Panels — Reinforced Earth Wall Panels in
size and shape as shown in the Plans Fabrication plant has
annual approval for methods and materials to be used
See Shop Drawing
Fabrication at other locations may be approved, after facdities
inspection, contact HQ Lab
26 Precast Concrete Walls - Precast Concrete Walls - tilt-up wall
panel in size and shape as shown in Plans
Fabrication plant has annual approval for methods and materials
to be used
Supplemental to Wage Rates
08/31/2013 Edition, Published August 1st, 2013
�
� �
; �
,
, �
�
�
a �
�
�
�
�
n
'
,
�
,
�
,
'
,
'
'
ITEM DESCRIPTION YES NO
27 Precast Radroad Crossings - Concrete Crossing Structure
Slabs
28 12, 18 and 26 inch Standard Precast Prestressed Girder —
Standard Precast Prestressed Girder for use in structures
Fabricator plant has annual approval of inethods and materials to
be used Shop Drawing to be provided for approval prior to
castmg girders
See Std Spec Section 6-02 3(25)A
2g Prestressed Concrete Girder Series 4-14 - Prestressed Concrete
Girders for use in structures Fabricator plant has annual approval
of inethods and materials to be used Shop Drawing to be
provided for approval pnor to casting girders
See Std Spec Section 6-02 3(25)A
30 Prestressed Tn-Beam Girder - Prestressed Tri-Beam Girders for
use m structures Fabricator plant has annual approval of
methods and materials to be used Shop Drawing to be provided
for approval pnor to casting girders
See Std Spec Section 6-02 3(25)A
31 Prestressed Precast Hollow-Core Slab — Precast Prestressed
1 Hollow-core slab for use in structures Fabncator plant has annual
approval of inethods and materials to be used Shop Drawing to
be provided for approval pnor to casting girders
' See Std Spec Section 6-02 3(25)A
32 Prestressed-Bulb Tee Girder - Bulb Tee Prestressed Girder for
' use in structures Fabricator plant has annual approval of
methods and materials to be used Shop Drawing to be provided
for approval prior to casting girders
See Std Spec Section 6-02 3(25)A
� 33 Monument Case and Cover
See Std Plan
'
�J
'
�
�
Supplemental to Wage Rates
08/31/2013 Edition, Published August 1st, 2013
� k
�
�
,
,
�
�
�
�
�
�
�
I
�
1�
5
ITEM DESCRIPTION YES NO
34 Cantilever Sign Structure - Cantilever Sign Structure
fabncated from steel tubing meeting AASHTO-M-183 See Std
Plans, and Contract Plans for detads The steel structure
shall be galvanized after fabrication in accordance with
AASHTO-M-111
35 Mono-tube Sign Structures - Mono-tube Sign Bridge
fabncated to detads shown m the Plans Shop drawings for
approval are required prior to fabrication
36 Steel Sign Bridges - Steel Sign Bndges fabricated from steel
tubing meeting AASHTO-M-138 for Aluminum Alloys
See Std Plans, and Contract Plans for detads The steel
structure
shall be galvanized after fabrication in accordance
with AASHTO-M-111
37 Steel Sign Post - Fabricated Steel Sign Posts as detailed in Std
Plans Shop drawings for approval are to be provided prior to
fabrication
38 Light Standard-Prestressed - Spun, prestressed, hollow
concrete poles
�
�
�
�
0
39 Light Standards - Lighting Standards for use on highway
dlumination systems, poles to be fabricated to conform with
methods and materials as specified on Std Plans See Specia �;
Provisions for pre-approved drawmgs
40 Traffic Signal Standards - Traffic Signal Standards for use on
highway and/or street signal systems Standards to be fabncated �
to conform with methods and material as specified on Std Plans
See S ecial Provisions for re-a roved drawin s
41 Precast Concrete Sloped Mountable Curb (Single and DualFaced) �
See Std Plans
Supplemental to Wage Rates
08/31/2013 Edition, Published August 1st, 2013
C�
'
'
'
,
�
,
,
,
'
'
'
,
'
'
'
�
,
,
'
ITEM DESCRIPTION YES NO
42 Traffic Signs - Pnor to approval of a Fabricator of Traffic Signs,
the sources of the following materials must be submitted and
approved for reflective sheeting, legend material, and aluminum
sheeting
NOTE: *** Fabrication inspection required On(y signs tagged
"Fabrication Approved" by WSDOT Sign Fabrication Inspector to
be mstalled
43 Cutting & bendmg reinforcmg steel
44 Guardrad components �� �
45 Aggregates/Concrete mixes
46 Asphalt
47 Fiber fabrics
48 Electrical wiring/components
49 treated or untreated timber pile
50 Girder pads (elastomeric bearing)
51 Standard Dimension lumber
52 Irrigation components
Supplemental to Wage Rates
08/31/2013 Edition, Published August 1st, 2013
����
Custom Std
Message Signing
Messa i
�
� �
Custom Standari
End Sec Sec
Covered by
WAC 296-127-018
Covered by
WAC 296-127-018
�
�
�
�
�
�
7
�=7
1
�7
ITEM DESCRIPTION YES NO
. �
53 Fencing materials
54 Guide Posts
55 Traffic Buttons
56 Epoxy
57 Cribbing
58 Water distribution materials
59 Steel "H" pdes
60 Steel pipe for concrete pile casings
61 Steel pile tips, standard
62 Steel pile tips, custom
0
�
�
�
�
�
�
�
Prefabricated items specificaliy produced for public works pro�ects that are prefabricated in a
county other than the county wherein the public works pro�ect is to be completed, the wage for
the offs�te prefabrication shal! be the applicable prevadmg wage for the county in which the actual
prefabrication takes place
It is the manufacturer of the prefabricated product to verify that the correct county wage rates are
applied to work they perform
See RCW 39 12 010
(The definit�on of "locality" in RCW 39 12 010(2) contams the phrase "wherein the physical work is bemg performed " The
department interprets this phrase to mean the actual work site
Supplementai to Wage Rates
08/31/2013 Edition, Published August 1st, 2013
$ �
'
�
�
❑
'
'
,
'
�J
�l
'
'
�
L
'
'
�
�J
,
�
'
WSDOT's List of State Occupations not applicable to Heavy and
Highway Construction Projects
This pro�ect is sub�ect to the state hourly minimum rates for wages and fringe benefits in
the contract provisions, as provided by the state Department of Labor and Industries
The following list of occupations, is comprised of those occupations that are not normally
used in the construction of heavy and highway pro�ects
When considenng �ob classifications for use and / or payment when bidding on, or
budding heavy and highway construction pro�ects for, or administered by WSDOT, these
Occupations wdl be excepted from the included "Washington State Prevailing Wage
Rates For Public Work Contracts" documents
• Buddmg Service Employees
• Electrical Fixture Maintenance Workers
• Electricians - Motor Shop
• Heating Equipment Mechanics
• Industrial Engine and Machine Mechanics
• Industrial Power Vacuum Cleaners
• Inspection, Cleaning, Sealing of Water Systems by Remote Control
• Laborers - Underground Sewer & Water
• Machinists (Hydroelectric Site Work)
• Modular Buildings
• Playground & Park Equipment Installers
• Power Equipment Operators - Underground Sewer & Water
• Residential ''** ALL ASSOCIATED RATES ''"`
• Sign Makers and Installers (Non-Electrical)
• Sign Makers and Installers (Electncal)
• Stage Rigging Mecharncs (Non Structural)
The following occupations may be used only as outlmed m the preceding text concerning
"WSDOT's list for Suppliers - Manufacturers - Fabricators"
• Fabricated Precast Concrete Products
• Metal Fabrication (In Shop)
Definitions for the Scope of Work for prevailing wages may be found at the Washington
State Department of Labor and Industnes web site and in WAC Chapter 296-127
Supplemental to Wage Rates 9
08/31/2013 Edition, Published August 1st, 2013
Washington State Department of Labor and Industries
Policy Statements
(Regarding Production and Delivery of Gravel, Concrete, Asphalt, etc.)
WAC 296-127-018 Agency filings affecting this section
Coverage and exemptions of workers involved in the production and delivery of
gravel, concrete, asphalt, or s�milar materials.
(1) The materials covered under this section include but are not limited to Sand,
gravel, crushed rock, concrete, asphalt, or other simdar materials
(2) All workers, regardless of by whom employed, are sub�ect to the prov�sions of
chapter 39 12 RCW when they perform any or all of the followmg functions
(a) They deliver or discharge any of the above-listed materials to a public works
pro�ect site
(i) At one or more point(s) directly upon the location where the matenal will be
incorporated into the pro�ect, or
(n) At multiple points at the proJect, or
(ui) Ad�acent to the location and coordinated with the mcorporation of those materials
(b) They wait at or near a public works pro�ect site to perform any tasks sub�ect to this
section of the rule
(c) They remove any matenals from a public works construction site pursuant to
contract requirements or specifications (e g, excavated materials, materials from
demolished structures, clean-up materials, etc )
(d) They work in a materials production facility (e g, batch plant, borrow pit, rock
quarry, etc ,) which is established for a public works pro�ect for the specific, but not
necessanly exclusive, purpose of supplying matenals for the pro�ect
(e) They deliver concrete to a public works site regardless of the method of
incorporation
(fl They assist or participate in the mcorporation of any materials into the public works
pro�ect
Supplemental to Wage Rates 10
08/31/2013 Edition, Published August 1st, 2013
C
���
'
'
,
�
(3) All travel time that relates to the work covered under subsection (2) of this section
requires the payment of prevading wages Travel time includes time spent waiting to
load, loading, transporting, waiting to unload, and delivering materials Travel time would
include all time spent in travel in support of a public works pro�ect whether the vehicle is
empty or full For example, travel time spent returning to a supply source to obtain
another load of material for use on a public works site or returnmg to the public works
site to obtam another load of excavated material is time spent in travel that is sub�ect to
prevailing wage Travel to a supply source, including travel from a public works site, to
obtain materials for use on a private pro�ect would not be travel sub�ect to the prevading
wage
(4) Workers are not sub�ect to the provisions of chapter 39 12 RCW when they deliver
mate�ials to a stockpile
(a) A"stockpde" is defined as materials delivered to a pde located away from the site
� of incorporation such that the stockpded materials must be physically moved from the
stockpile and transported to another location on the pro�ect site in order to be
incorporated into the pro�ect
LJ
,
'
,
,
'
'
'
'
C J
1
(b) A stockpile does not mclude any of the functions described in subsection (2)(a)
through (fl of this section, nor does a stockpile include materials delivered or distributed
to multiple locations upon the pro�ect site, nor does a stockpile include materials dumped
at the place of incorporation, or ad�acent to the location and coordinated with the
incorporation
(5) The applicable prevailing wage rate shall be determined by the locality in which
the work is performed Workers sub�ect to subsection (2)(d) of this section, who produce
such materials at an off-site facdity shall be paid the applicable prevailing wage rates for
the county in which the off-site facdity is located Workers sub�ect to subsection (2) of
this section, who deliver such materials to a public works pro�ect site shall be paid the
applicable prevailing wage rates for the county in which the public works pro�ect is
located
[Statutory Authority Chapter 39 12 RCW, RCW 43 22 051 and 43 22 270 08-24-101, §
296-127-018, fded 12/2/08, effective 1/2/09 Statutory Authority Chapters 39 04 and
39 12 RCW and RCW 43 22 270 92-01-104 and 92-08-101, § 296-127-018, filed
12/18/91 and 4/1/92, effective 8/31/92 ]
Supplemental to Wage Rates 11
08/31/2013 Edition, Published August 1st, 2013
�
�
Benefit Code Key — Effective 831-2013 thru 3-4-2014
,
LJ
'
,
'
,
'
,
**s**s*********s********s****s*****ss**:c.ss*s*�***s*****s*s*****:**********s*******sss*****s********s*****s*
Overtime Codes
Overhme calculat�ons are based on the hourly rate actually pa�d to the worker On public works pro�ects, the hourly rate
must be not less than the prevailmg rate of wage mmus the hourly rate of the cost of fnnge benefits actually provided for
the worker
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL
BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
B All hours worked on Saturdays shall be paid at one and one-half t�mes the hourly rate of wage All hours worked
on Sundays and holidays shall be paid at double the hourly rate of wage
C The first two (2) hours after eight (8) regulaz hours Monday through Fnday and the first ten (10) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage All other overt�me hours and all hours worked on
Sundays and holidays shall be paid at double the hourly rate of wage
D The first two (2) hours before or after a five-eight (8) hour workweek day or a four-ten (10) hour workweek day and
the first eight (8) hours worked the next day after e�ther workweek shall be paid at one and one-half hmes the hourly
rate of wage All addrtional hours worked and all worked on Sundays and holidays shall be paid at double the hourly
rate of wage
E The first two (2) hours after eight (8) regulaz hours Monday through Fnday and the first eight (8) hours on Saturday
shall be paid at one and one-half hmes the hourly rate of wage All other hours worked Monday through Saturday,
and all hours worked on Sundays and hol�days shall be paid at double the hourly rate of wage
' F The first two (2) hours after eight (8) regulaz hours Monday through Fnday and the first ten (10) hours on Saturday
shall be paid at one and one-half hmes the hourly rate of wage All other overhme hours worked, except Labor Day,
shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at three hmes the
hourly rate of wage
,
'
G The first ten (10) hours worked on Saturdays and the first ten (10) hours worked on a�fth calendaz weekday m a
four-ten hour schedule, shall be paid at one and one-half rimes the hourly rate of wage All hours worked m excess
of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shali be paid at
double the hourly rate of wage
H All hours worked on Saturdays (except makeup days �f work �s lost due to mclement weather cond�t�ons or
' eqwpment breakdown) shall be pazd at one and one-half hmes the hourly rate of wage All hours worked Monday
through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shail be paid at double the
hourly rate of wage
'
'
'
,
L�
I All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage
J The first two (2) hours after eight (8) regulaz hours Monday through Fnday and the first ten (10) hours on Sahuday
shall be paid at one and one-half times the hourly rate of wage All hours worked over ten (10) hours Monday
through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage
K All hours worked on Saturdays and Sundays shall be paxd at one and one-half hmes the hourly rate of wage All
hours worked on holidays shall be pa�d at double the hourly rate of wage
M All hours worked on Saturdays (except makeup days if work �s lost due to mclement weather condrtions) shall be
paid at one and one-half times the hourly rate of wage All hours worked on Sundays and hol�days shall be paid at
double the hourly rate of wage
'
Benefit Code Key — Effective 8-31-2013 thru 3-4-2014
N All hours worked on Saturdays (except makeup days) shall be pa�d at one and one-half times the hourly rate of
wage All hours worked on Sundays and holidays shall be pa�d at double the hourly rate of wage
O The first ten (10) hours worked on Saturday shall be pa�d at one and one-half hmes the hourly rate of wage All
hours worked on Sundays, holidays and after twelve (12) hours, Monday through Fnday and after ten (10) hours on
Saturday shall be pa�d at double the hourly rate of wage
P All hours worked on Saturdays (except makeup days �f circumstances warrant) and Sundays shall be paid at one and
one-half t�mes the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage
Q The first two (2) hours after eight (8) regular hours Monday through Fnday and up to ten (10) hours worked on
Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked m excess of ten (10)
hours per day Monday through Saturday and all hours worked on Sundays and holidays (except Chnstmas day) shall
be paid at double the hourly rate of wage All hows worked on Chnstmas day shall be paid at two and one-half
hmes the hourly rate of wage
R Ali hours worked on Sundays and holidays shall be paid at two rimes the hourly rate of wage
S The first two (2) hours after eight (8) regulaz hows Monday through Fnday and the first eight (8) hours on Saturday
shall be paid at one and one-half hmes the hourly rate of wage All hours worked on hol�days and all other
overtime hours worked, except Labor Day, shall be paid at double the howly rate of wage All hours worked on
Labor Day shall be paad at three hmes the hourly rate of wage
U All hours worked on Saturdays sha11 be paid at one and one-half times the hourly rate of wage All hours worked on
Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage All hours worked on
Labor Day shall be paid at three t�mes the hourly rate of wage
V All hours worked on Sundays and hohdays (except Thanksgrvmg Day and Chnstmas day) sha11 be paid at one and
one-half tunes the hourly rate of wage All hours worked on Thanksgivmg Day and Chnstmas day shall be paid at
double the hourly rate of wage
W All hours worked on Saturdays and Sundays (except make-up days due to cond�t�ons beyond the control of the
employer)) shall be paid at one and one-half t�mes the hourly rate of wage All hours worked on hol�days shall be
paid at double the hourly rate of wage
X The first four (4) hours after eight (8) regulaz hours Monday through Fnday and the first twelve (12) hours on
Sahuday shall be paid at one and one-half hmes the hourly rate of wage All hours worked over twelve (12) hours
Monday through Saturday, Sundays and holidays shall be pa�d at double the hourly rate of wage When holiday falls
on Saturday or Sunday, the day before Saturday, Frtday, and the day after Sunday, Monday, shall be considered the
holiday and all work performed shall be pa�d at double the hourly rate of wage
Y All hours worked outs�de the hours of 5 00 am and 5 00 pm (or such other hours as may be agreed upon by any
employer and the employee) and all hows worked in excess of e�ght (8) hours per day (10 hours per day for a 4 x 10
workweek) and on Saturdays and holidays (except labor day) shall be paid at one and one-half t�mes the hourly rate
of wage (except for employees who are absent from work wrthout pnor approval on a scheduled workday dw7ng
the workweek shall be paid at the straight-rime rate until they have worked 8 hours m a day (10 m a 4 x 10
workweek) or 40 hours dw7ng that workweek ) All hours worked Monday through Saturday over twelve (12) hours
and ali hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage
Z All hours worked on Sahudays and Sundays shall be paid at one and one-half times the howly rate of wage All
hours worked on holidays shall be paid the straight time rate of pay m add�tion to holiday pay '
'
2 �
�
�,
�, Z
��
'
'
�
,
�
'
Benefit Code Key — Effective 831-2013 thru 3-4-2014
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL
BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
B All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage
C All hours worked on Sundays shall be pa�d at one and one-half t�mes the hourly rate of wage All hours worked on
hol�days shall be paid at two times the hourly rate of wage
F The first eight (8) hours worked on holidays shall be paid at the straight hourly rate of wage m addrtion to the
holiday pay All hours worked m excess of e�ght (8) hours on holidays shall be pa�d at double the hourly rate of
wage
G All hours worked on Sunday shall be paid at two rimes the hourly rate of wage All hours worked on paid hol�days
shall be paid at two and one-half hmes the hourly rate of wage u�►cludmg holiday pay
H All hours worked on Sunday shall be paid at two hmes the hourly rate of wage All hours worked on hol�days shall
be paid at one and one-half hmes the hourly rate of wage
K All hours worked on holidays shall be paxd at two times the hourly rate of wage m addrtion to the holiday pay
O All hours worked on Sundays and holidays shall be paid at one and one-half hmes the hourly rate of wage
R All hours worked on Sundays and holidays and all hours worked over sixty (60) m one week shall be paid at double
the hourly rate of wage
U All hours worked on Saturdays shall be paid at one and one-half hmes the hourly rate of wage All hours worked
over 12 hours m a day or on Sundays and holidays shall be paid at double the hourly rate of wage
, W The first two (2) hours after eight (8) regular hours Monday through Fnday and the first e�ght (8) hows on Saturday
shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage On a four-day,
ten-hour weekly schedule, erther Monday thru Thursday or Tuesday thru Fnday schedule, all hours worked after ten
, shall be paid at double the hourly rate of wage The first eight (8) hours worked on the fifth day shall be paid at one
and one-half times the howly rate of wage All other hours worked on the fifth, sixth, and seventh days and on
hol�days shall be paid at double the hourly rate of wage
,
'
�
,
�J�
'
,
Y All hours worked on Saturdays (except for make-up days) shall be pazd at one and one-half times the hourly rate of
wage All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and
hol�days shall be paid at double the hourly rate of wage
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL
BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
A Work performed m excess of e�ght (8) hours of straight hme per day, or ten (10) hours of straight time per day when four
ten (10) hour shifts aze established, or forty (40) hours of straight time per week, Monday through Fnday, or outside the
normal shift, and all work on Saturdays shall be paid at hme and one-half the stra�ght hme rate Hours worked over
twelve hours (12) m a smgle shift and all work performed a8er 6 00 pm Saturday to 6 00 am Monday and holidays shall
be pa�d at double the stra�ght time rate of pay Any shift startmg between the hours of 6 00 pm and midrught shall
receive an addrtional one dollaz ($1 00) per hour for all hours worked that stuft The employer shall have the sole
d�screhon to assign overtime work to employees Pnmary consideration for overtime work shall be g�ven to employees
regularly assigned to the work to be performed on overtune situations After an employee has worked eight (8) hours at
an applicable overtime rate, all addrtional hours shall be at the applicable overtime rate unt�l such hme as the employee
has had a break of e�ght (8) hours or more
'
Benefit Code Key — Effective 8-31-2013 thru 3-4-2014
4
B The first four (4) hours after eight (8) regular hours Monday through Fnday and the first twelve (12) hours on
Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over twelve (12) hours
Monday through Saturday, and all hours worked on Sundays and hol�days shall be paid at double the hourly rate of
wage
C Work performed m excess of eight (8) hours of straight hme per day, or ten (10) hours of stra�ght time per day when
four ten (10) hour shifts are establ�shed, or forly (40) hours of stra�ght time per week, Monday through Fnday, or
outside the normal shift, and all work on Saturdays shall be paid at one and one-half hmes the hourly rate of wage
All work performed after 6 00 pm Saturday to 5 00 am Monday and Holidays shall be paid at double the hourly rate
of wage After an employee has worked e�ght (8) hours at an applicable overt�me rate, all addrtional hours shall be at
the applicable overtime rate unhl such tune as the employee has had a break of eight (8) hours or more
D All hours worked between the hours of 6 00 pm and 6 00 am, Monday through Saturday, shall be paid at a premium
rate of 15% over the hourly rate of wage All other hours worked after 6 00 am on Saturdays, shall be paid at one
and one-half t�mes the hourly rate of wage All hours worked on Sundays and hol�days shall be paid at double the
hourly rate of wage
E All hours worked Sundays and holidays shall be pa�d at double the hourly rate of wage Each week, once 40 hours of
straight tune work is achieved, then any hours worked over 10 hours per day Monday through Saturday shall be paid
at double the hourly wage rate
F All hours worked on Saturday shall be pa�d at one and one-half hmes the hourly rate of wage All hours worked on
Sunday shall be pa�d at two t�mes the hourly rate of wage All hours worked on paid holidays shall be paid at two
and one-half times the hourly rate of wage mcludmg holiday pay
G Work performed m excess of eight (8) hours of stra�ght hme per day, or ten (10) hours of straight t�me per day when
four ten (10) hour shifts aze established, or forty (40) hours of straight tune per week, Monday through Fnday, , and
all work on Saturdays shall be paid at time and one-half the straight time rate Hours worked over twelve hours (12)
m a smgle shift and all work performed after 8 00 am Sunday to 8 00 am Monday and Holidays shall be paid at
double the straight time rate of pay After an employee has worked eight (8) hours at an applicable overtime rate, all
addrtional hours shall be at the applicable overtime rate until such hme as the employee has had a brealc of eight (8)
hours or more
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL
BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
A All hours worked m excess of eight (S) hows per day or forty (40) hours per week shall be paid at double the hourly
rate of wage All hours worked on Saturdays, Sundays and holidays sha11 be pa�d at double the hourly rate of wage
Holiday Codes
A Hohdays New Yeaz's Day, Memonal Day, Independence Day, Labor Day, Thanksgrvmg Day, Fnday after
Thanksgiving Day, and Chnstmas Day (7)
B Holidays New Year's Day, Memonal Day, Independence Day, Labor Day, Thanksgivmg Day, Fnday after
Thanksgivmg Day, the day before Chnshnas, and Chnstmas Day (8)
C Holidays New Year's Day, Presidents' Day, Memor�al Day, Independence Day, Labor Day, Thanksgiving Day,
the Fnday after Thanksg�vmg Day, And Chnstmas Day (8)
D Holidays New Yeaz's Day, Memonal Day, Independence Day, Labor Day, Thanksg�vmg Day, the Fnday and
Saturday after Thanksgrvmg Day, And Chnstmas Day (8)
4
� '
' H
' S I
�
r
�
r
'
�
,
'
'
'
� 6
�
'
�
'
r
J
K
L
N
P
Q
R
S
T
Z
A
E
C�
I�i
Benefit Code Key — Effective 8-31-2013 thru 3-4-2014
Hohdays New Yeaz's Day, Memonal Day, Independence Day, Thanksgrvmg Day, the Day after Thanksgrvmg Day,
And Chnstmas (6)
Hohdays New Year's Day, Memonal Day, Independence Day, Labor Day, Thanksgrvmg Day, and Chnstmas Day
(6)
Hol�days New Year's Day, Memonal Day, Independence Day, Thanksg�vmg Day, Friday after Thanksgrvmg Day,
Chnstmas Eve Day, And Chnstmas Day (7)
Hohdays New Yeaz's Day, Presidents' Day, Memonal Day, Independence Day, Labor Day, Thanksgivmg Day,
Fr�day After Thanksgivmg Day, The Day Before Chrishnas, And Chnstmas Day (9)
Hol�days New Yeaz's Day, Martm Luther Kmg Jr Day, Memonal Day, Independence Day, Labor Day,
Thanksgivmg Day, Fnday After Thanksgrvmg Day, And Chrtstmas Day (8)
Holidays New Year's Day, Presidents' Day, Memonal Day, Independence Day, Labor Day, Veterans' Day,
Thanksgiving Day, The Fnday After Thanksgiv�ng Day, And Chnstmas Day (9)
Hol�days New Year's Day, Memonal Day, Independence Day, Labor Day, Thanksgrvmg Day, Fnday And Saturday
After Thanksgivmg Day, The Day Before Chnshnas, And Chnstmas Day (9) If A Holiday Falls On Sunday, The
Follownng Monday Shall Be Considered As A Holiday
Paid Holidays New Year's Day, Mernonal Day, Independence Day, Labor Day, Thanksgivmg Day, and Chnshnas
Day (6)
Paid Holidays New Year's Day, Memonal Day, Independence Day, Labor Day, Thanksgiving Day, Day After
Thanksgivmg Day, One-Half Day Before Chnstmas Day, And Chnshnas Day (7 1/2) �
Paid Hol�days New Year's Day, Prestdents' Day, Memonal Day, Independence Day, Labor Day, Thanksgivmg
Day, And Chnstmas Day (7)
Paid Holidays New Yeaz's Day, Washmgton's B�rthday, Memonal Day, Independence Day, Labor Day,
Thanksgivmg Day, The Fnday After Thanksgivmg Day, Christmas Day, And The Day Before Or After Chnstmas
(9)
Holidays New Year's Day, Memonal Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the
Fnday after Thanksgrvmg Day, And Chnstmas Day (8)
Holidav Codes Continued
Paid Hol�days New Year's Day, Presidents' Day, Memonal Day, Independence Day, Labor Day, Thanksg�vmg
Day, The Fnday After Thanksgrvmg Day, And Chnstmas Day (8)
Paid Hol�days New Year's Day, Day Before Or After New Yeaz's Day, Presidents Day, Memorial Day,
Independence Day, Labor Day, Thanksgivmg Day, Day After Thanksgivmg Day, Chnstmas Day, And A Half-Day
On Chnstmas Eve Day (9 1/2)
Paid Holidays New Yeaz's Day, Martm Luther Kmg Jr Day, Presidents' Day, Memonal Day, Independence Day,
Labor Day, Veterans' Day, Thanksgivmg Day, The Fnday After Thanksgivmg Day, Chr�stmas Day, And Chnstmas
Eve Day (11)
Paid Hol�days Naw Year's Day, New Year's Eve Day, Memonal Day, Independence Day, Labor Day,
5
'
Benefit Code Key — Effective 8-31-2013 thru 3-4-2014
T
Thanksgxvmg Day, Fnday After Thanksgrvmg Day, Chnstmas Day, The Day After Christmas, And A Floahng
Hol�day (10)
Paid Holidays New Year's Day, Memonal Day, Independence Day, Labor Day, Thanksgivmg Day, Fnday
After Thanksgivmg Day, And Chnstmas Day (7)
Paid Holidays New Year's Day, Presidents' Day, Memonal Day, Independence Day, Labor Day,
Thanksgiving Day, The Friday After Thanksgrvmg Day, The Last Worlang Day Before Chnstmas Day,
And Chnstrnas Day (9)
,
,
L�
Z Hol�days New Yeaz's Day, Memonal Day, Independence Day, Labor Day, Thanksgivmg Day, Fnday after
Thanksgivmg Day, And Chnstmas Day (7) If a hohday falls on Saturday, the precedmg Fnday shall be
cons�dered as the holiday If a hol�day falls on Sunday, the following Monday shall be considered as the
hohday
'
r
Holidav Codes ConNnued
7 A Holidays New Year's Day, Memonal Day, Independence Day, Labor Day, Thanksgivmg Day, The Fnday And t
Saturday After Thanksgiving Day, And Chnstmas Day (8) Any Hohday Whsch Falls On A Sunday Shall Be
Observed As A Holiday On The Followmg Monday If any of the listed hol�days falls on a Saturday, the precedmg �
Fnday sha11 be a regulaz work day
B Hohdays New Yeaz's Day, Memonal Day, Independence Day, Labor Day, Thanksg�vmg Day, the Fnday and
Saturday after Thanksgiving Day, And Chnshnas Day (8) Any hohday wh�ch falls on a Sunday shall be observed as '
a holiday on the followmg Monday Any holiday wtuch fal(s on a Saturday shall be observed as a holiday on the
precedmg Fnday
C Hol�days New Yeaz's Day, Martin Luther Kmg Jr Day, Memonal Day, Independence Day, Labor Day,
Thanksgivmg Day, The Fnday After Thanksgivmg Day, And Chnstmas Day (8) Any hohday wh�ch falls on a
Sunday shall be observed as a hol�day on the followmg Monday Any holiday which falls on a Saturday shall be
observed as a holiday on the precedmg Fnday
D Paid Holidays New Yeaz's Day, Memonal Day, Independence Day, Labor Day, Veteran's Day, Thanksgivmg
Day, the Fnday after Thanksgrvmg Day, And Chnstmas Day (8) Unpaid Hohdays PresidenYs Day Any pa�d
holiday which falls on a Sunday shall be observed as a holiday on the followmg Monday Any paid hol�day which
falls on a Saturday shall be observed as a hol�day on the precedmg Fnday
e
�
,
E Hoi�days New Yeaz's Day, Memonal Day, Independence Day, Labor Day, Thanksgiving Day, the Fnday after �
Thanksgivmg Day, And Chnshnas Day (7) Any hohday wh�ch falls on a Sunday shall be observed as a hohday on
the follownng Monday Any holiday which falls on a Saturday shall be observed as a holiday on the precedmg
Fnday
F Holidays New Yeaz's Day, Memonal Day, Independence Day, Labor Day, Thanksgivmg Day, the Fnday after ,
Thanksgivmg Day, the last worlang day before Chnstmas day and Christmas day (8) Any holiday which falls on a
Sunday shall be observed as a holiday on the followmg Monday Any holiday wh�ch falls on a Saturday shall be
observed as a hol�day on the precedmg Fnday �
G Holidays New Year's Day, Memonal Day, Independence Day, Labor Day, Thanksgivmg Day, and Chnstmas Day
(6) Any holiday which falls on a Sunday shall be observed as a hol�day on the followmg Monday
H Holidays New Yeaz's Day, Martm Luther Kmg Jr Day, Independence Day, Memor�al Day, Labor Day,
Thanksgiving Day, the Fnday after Thanksgivmg Day, the Last Workmg Day before Chnstmas Day and Chnstmas
Day (9) Any hol�day which falls on a Sunday shall be observed as a holiday on the followmg Monday Any holiday
which falls on a Saturday shall be observed as a holiday on the precedmg Fnday
'
�
�
�
i�
I I ,
�
�
Benefit Code Key — Effective 8-31-2013 thru 3-4-2014
I Hohdays New Year's Day, President's Day, Independence Day, Memonal Day, Labor Day, Thanksgrvmg Day, The
Fr�day After Thanksgivmg Day, The Day Before Chnstmas Day And Christmas Day (9) Any hol�day wh�ch falls
on a Sunday shall be observed as a holiday on the followmg Monday Any holiday which falls on a Saturday shall
be observed as a holiday on the precedmg Fnday
7 J Hol�days New Yeaz's Day, Independence Day, Memonal Day, Labor Day, Thanksgivmg Day and Chnstmas Day
(6) Any holiday which falls on a Sunday shall be observed as a holiday on the followmg Monday Any holiday
which falls on a Saturday shall be observed as a hol�day on the precedmg Fnday
K Hohdays New Yeaz's Day, Memonal Day, Independence Day, Thanksgivmg Day, the Fnday and Saturday after
' Thanksgtvmg Day, And Chnstmas Day (8) Any hohday which falls on a Sunday shall be observed as a hohday on
the followmg Monday Any holiday wh�ch falls on a Saturday shall be observed as a holiday on the precedmg
Fnday
L�
'
,
'
�
'
�
'
'
1
'
L Holidays New Yeaz's Day, Memor�al Day, Labor Day, Independence Day, Thanksgivu►g Day, the Last Work Day
before Christmas Day, And Chnstmas Day (7) Any hohday which fa11s on a Sunday shall be observed as a hohday
on the follownng Monday Any hol�day which falls on a Saturday shall be observed as a holiday on the precedmg
Fnday
M Paid Holidays New Yeaz's Day, The Day after or before New Yeaz's Day, Pres�denYs Day, Memonal Day,
Independence Day, Labor Day, Thanksgivmg Day, the Fnday after Thanksgivmg Day, Chnshnas Day, And the Day
after or before Chr�stmas Day 10) Any holiday wh�ch falls on a Sunday shall be observed as a holiday on the
follov�nng Monday Any holiday which falls on a Saturday shall be observed as a hol�day on the precedmg Friday
N Holidays New Yeaz's Day, Memonal Day, Independence Day, Labor Day, Thanksgivmg Day, the Fnday after
Thanksg�ving Day, And Chnstmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday When Chnstmas falls on a Saturday, the preceding Fnday shall be observed as a holiday
O Paid Holidays New Yeaz's Day, The Day After Or Before New Year's Day, Pres�denYs Day, Memonal Day,
Independence Day, Labor Day, Thanksgivmg Day, The Fnday After Thanksgrv�ng Day, Chnstmas Day, The Day
After Or Before Chnstcnas Day, And The Employees B�rthday 11) Any holiday which falls on a Sunday shall be
observed as a holiday on the followmg Monday Any holiday which falls on a Saturday shall be observed as a
holiday on the precedmg Fnday
P Holidays New Year's Day, Memonal Day, Independence Day, Labor Day, Thanksgrving Day, Fnday after
Thanksgivmg Day, And Chnstmas Day (7) Any holiday which falls on a Sunday shall be observed as a hol�day on
the followmg Monday
Q Holtdays New Year's Day, Memonal Day, Independence Day, Labor Day, Thanksg�vmg Day, the Fnday after
Thanksgivmg Day, the Last Worlang Day before Chnshnas Day and Chnstmas Day (8) Any holiday which falls on
a Sunday shall be observed as a hol�day on the followmg Monday If any of the listed hol�days falls on a Saturday,
the precedmg Friday shall be a regulaz work day
R Paid Holidays New Year's Day, the day after or before New Year's Day, President's Day, Memonal Day,
Independence Day, Labor Day, Thanksgrvmg Day, the Fnday after Thanksgivmg Day, Christmas Day, and the day
after or before Chnstmas Day (10) If any of the listed holidays fall on Saturday, the precedmg Fnday shall be
observed as the holiday If any of the listed holidays falls on a Sunday, the day observed by the Nahon shall be
considered a holiday and compensated accordmgly
S Paid Holidays New Yeaz's Day, Memonal Day, Independence Day, Labor Day, Thanksgivmg Day, Fnday After
Thanksgivmg Day, Chnstmas Day, The Day After Chnstmas, And A Floahng Holiday (9) If any of the listed
holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated
accordmgly
r 8 A
�
Note Codes
In addrt�on to the hourly wage and frmge benefits, the followmg depth premiums apply to depths of fifty feet or
more
7
'
Benefit Code Key — Effective 8-31-2013 thru 3-4-2014
Over 50' To 100' -$2 00 per Foot for Each Foot Over 50 Feet
Over 100' To 150' -$3 00 per Foot for Each Foot Over 100 Feet
Over 150' To 220' -$4 00 per Foot for Each Foot Over 150 Feet
Over 220' -$5 00 per Foot for Each Foot Over 220 Feet
C In addrtion to the hourly wage and fnnge benefits, the followmg depth prem�ums apply to depths of fifty feet or
more
Over 50' To 100' -$1 00 per Foot for Each Foot Over 50 Feet
Over 100' To 150' -$1 50 per Foot for Each Foot Over 100 Feet
Over 150' To 200' -$2 00 per Foot for Each Foot Over 150 Feet
Over 200' -Drvers May Name Their Ovm Pnce
D Workers worlang wrth supphed a�r on hazmat pro�ects recerve an addit�onal $1 00 per hour
L Workers on hazmat pro�ects receive addrt�onal hourly premiums as follows -Level A$0 75, Level B$0 50, And
Level C $0 25 ° r
M Workers on hazmat pro�ects receive add�tional hourly premiums as follows Levels A& B$1 00, Levels C& D
$0 50
N
P
.�
Workers on hazmat pro�ects receive addrtional hourly premiums as follows -Level A$1 00, Level B$0 75, Level
C$0 50, And Level D$0 25
Workers on hazmat pro�ects receive addrtional howly premiums as follows -Class A Su�t $2 00, Class B Surt
$1 50, Class C Surt $1 00, And Class D Surt $0 50
The tughest pressure reg�stered on the gauge for an accumulated time of more than fifteen (15) muiutes dw7ng the
sh�ft shall be used m determmmg the scale paid
R Effechve August 31, 2012 — A Traffic Control Supervisor shall be present on the pro�ect whenever flaggmg or
spottmg or other traflic control labor is beu►g utilized A Traffic Control Laborer performs the setup, mamtenance
and removal of all temporary traffic control dev�ces and construction s�gns necessary to control vehicular, b�cycle,
and pedestnan traffic dunng construchon operations Flaggers and Spotters shall be posted where shown on
approved Traffic Control Plans or where directed by the Engmeer All flaggers and spotters shall possess a current
flaggmg cazd issued by the State of Washu►gton, Oregon, Montana, or ldaho These classifications aze only effect�ve
on or after August 31, 2012
S Effecnve August 31, 2012 — A Traffic Control Superv�sor shall be present on the pro�ect whenever flaggU►g or
spothng or other traffic control labor �s bemg utilized Flaggers and Spotters shall be posted where shown on
approved Traffic Control Plans or where du�ected by the Engmeer All flaggers and spotters shall possess a current
flaggmg cazd issued by the State of Waslungton, Oregon, Montana, or ldaho Th�s class�fication is only effect�ve on
or after August 31, 2012
T Effectrve August 31, 2012 — A Traffic Control Laborer performs the setup, mamtenance and removal of all
temporary traffic controi devices and construchon s�gns necessary to control vehicular, b�cycle, and pedestnan
traffic dunng construction operat�ons Flaggers and Spotters shall be posted where shown on approved Traffic
Control Plans or where directed by the Engmeer All flaggers and spotters shall possess a current flagging cazd
issued by the State of Washmgton, Oregon, Montana, or ldaho This classificat�on is only effechve on or after
August 31, 2012
8
�
,
'
'
�
�
�
�
u
�
�
'
'
,
,
,
'
'
APPENDIX B
CITY OF BREMERTON STANDARD DETAILS
'
'�
,
,
'
,
'
'
,
'
'
'
'
'
'
,
1
'
1
'
� � SIDEWALK
VARIES - S - 0" MIN
(SEE STANDARD)
3��
_2% 2%_
3 �MAX �,
� COLD JWNT �
4' CRU3HED SURFAGN(i J
TOP COURSE. OOMPAiL"fFD
TO 95% DENSrIY
CEMENT CONCRETE SIDEWALK
no�nceNr To cx�
1
r nAUr
, _29i
SIDEWALK
� (� sr
al 2%
CURB AND (3UTTQt
8EE STANDARDS
LANTER STRIP
�orH vawES �
p � P w E , R 1 ^ C - R � Y �
� 1 N\I./�
4' CRUSHED SURFAqNG J
TOP COURSE, (�MPACiED
TO 95% DEN31iY
CEMENT CONCRETE SIDEWALK
ADJACENT TO PLANTER STRIP
. ��
,�
.v
s � Q \'
\�
��„
CURB AND OIIITER
QFF STAND/4RD8
' �\�\
\. ��
\
\ �
Z
� � 1�
�
G � �
i � ' G L
'���
�L �
OC CONTRACTION JOINT
< ` � '\�
1 � L �
R�
�_ PREMOLDED
JOINT FlLLER
DE EXPANSION JOINT
TFiAN3NERSE
BROOMED FlMISH
4' WIDE. SAAOOTH
/` TROWELED PEWMETER
CEMENT CONCRETE WRB
AND (3UTTEI� 3EE
STANDARD
�����" � � OOLD .101rlf
CONTRACTION .IOINT
IN SIDEWALKONLY
FULL DEPiH D�AN.SION
JOINT IN BOTH CURB AND
SIDEWALK
JOINT AND FINISH
DETAIL
NOTES
1 SIDEWALKS THROUGH CONCRETE DRNEWAYS SIiN.L BE 8' THIdG
2 SIDEWALKS 8HALL BE CLA88 3000 (�MMINT WN�ETE
MINIMUM SIDEWALK WIDTH IS 5.0'
3. 3EE STANDARD DRAWING 5102 FOR SPEqFlC 31DEWIW( REQUIREMENI'3 IN
DOWNTOWN ZONE
4 FORM AND 3UBGRADE INSPECl70N IS RE�UIRED BEFORE PLAqNO
CONCRErE
5. CONCRETE 81DEWALK8 SHALL BE CURED POR 72 FQt3. MIN
�� � �rem�
CONCRETE SIDEWALK DETAIL
PUBiJC WORKS NON-DOWNTOWN LOCATIONS
AIO�n of tlds dr8wing ia P►oNbited MY e�pproval of en alEerad draMnB
EN�INEERING DIVISION tswe,mprl�edm,dvoid
3101
ReNelon DaEB
8/15/08
SIDEWALK
3/8' EXPAN310N JOINT (lYP )
�
/
O
' a
i1� 4 a.F
4• ��, � '�~ ' �� ;
N 1� �'�,��
M/ !!� i \ � �
1
J ! `` , t
t� l �"=
/ a
J �-_�--'" .
.._
�_
DETECTABI.E
WARNING
PATTERN
(SEE DETAIL)
� � 5�
CURB, OR CURB � 1 �
AND GUTTER � ' � 2' - 0"
CR03SWALK
PLAN VIEW
WHEELCHAIR RAMP TYPE A
4'-0'MIN 8'-0'MIN
LANDING �P 2' - 0' 3'
m
,� s �
� � � �� �
CEMENT CONCRETE � �
31DEWALK DEIECTABLE WARNING _
PAT7ERN (SEE DETAIL)
FLUSH JOINT BETWEEN RAMP AND BACK OF CURB
SECTION O
NOTE3
1 THE RAMP DETAIL SHOWN MAY NOT BE
SUITABLE FOR ALL SITUATIONS SEE
WSDOT STANDARD PLAN3 (FSERIES) FOR
ACCEPTABLE ALTERNATE3
2 DETECTABLE WARNING PATfERN3 FOR
NEW RAMP INSTALlA710N SHALL BE
FORMED WITH A CAST IPI-PLACE, TiLE
MATERIAL THE MATERIAL SHALL BE BLACK,
31aD RESISTANT, SPECIFlCALLY DESIGNED
AND MANUFACTURED FOR PURPOSES OF
PROVIDING ADA-COMPLIANT DETECTABLE
WARNINGS, AND SHALL BE INSTALLED IN
ACCORDANCE WITH MANUFACTURER
SPECIFlCATION3
3 OFFSET DETECTABLE WARNINGS 3" FROM
JOINT AT NARROWEST LOCATION
BETWEEN RAMP AND BACK OF CUI�
4 AVOID PLACING DRAINAGE STRUCTURE3,
JUNCTION BOXE3, OR OTHER
OBS7RUCTION3 IN FRONT OF RAMP AREA.
TOP OF
ftOADWAY
DEPRESSED
CURB 8 GUTiER
DETECTABLE WARNING q
PATTERN AREA SHALL BE �P
BLACK. B rt
�
O - O (
q � �
O - O (
B
■ �
� PLAN
��� � B 5/8"
�'�' C 7/16"
� I ,� D 7!S"
�
ELEVATION
TRUNCATED DOMES (SEE NOTE)
DETECTABLE WARNING PATTERN DETAIL
CI� Of BI'+9�1'�f WHEELCHAIR RAMP
TYPE A 3111
� PUBUC WORKS
ReMelon Dema
ENOINEERING DM810N � m nde drarrtr,� � m�,d� ���� 8/15/08
�
,
,
II ,
'
'' '
', '
1
I
'
� ,
l i ,
�I '
i '
I '
'
'
'
1
'
PLANTER S'iRIP
WIDTH VARIES
1 �
TYPE I
DimVEWAY WRH
PLANTER S7�P
(VIMERE STRIP IS
4' WIDE OR GREA7ER)
i
918' D� JWPIT
FULL DE (iYP ) i
' �P
A_
�' `
\ ' �=,
COLD JOINT OR
EXP JOINT
CEAAENT CONCRE7E
«,�$�
PER C(TY 3TANDARDS
/
3/8' D� JOINT
FULL DE (1'YP ?
A � �
TYPE II �•
DRIVEWAY YNi11
WIDE SIDEINAL.K �► /
G SLOPE
1296
TYPE III
DRIVEWAY WI7H
DEPRESSED SIDEWALK
(TO BE I�ED WIiEN
SIDEVUALK IS 8'
WIDE OR LE38)
3/B• D� JOINT
FULL DEP7'H (1'YP )
N D�RNEWAY WIDTH SHALL BE IDENTIFIED ON PLANS
RESIDENTIAL 10'-20' COMMERCWL.25'�5'
y W�iERE pNV EXCEEDS 15' WIDTH A FULL DEPTH
EXPANSION JOINT SHALL BE PLACED TRANSVERSLY,
CENTERED IN WHLIC.
S FORM AND SUBGRADE INSPECTION ARE REQUIRED
BEFORE POURING CONCRETE
4 DRNEWAYS SHALL BE B' THICK, AIR-ENTRAINED 4000
PSI SIDEWALK AND DRNEWAY APRON SHALL BE 8"
THICK, 3000 PSI THROUGH DRIVEWAY SECTION
5 CONCRETE SHALL BE CURED FOR 72 HRS MIN
(i1� Of BI'+01Y1e1'�011
PuBUC woRKs
ENQINEERIN� DMSION
EXP JOINT
CEMENT CONCREiE
PER a iTY G 3�T�DARD3
CEMENT CONCRETE
CURB 8 GUTTER
PER CITY STANDARDS
VAWEB VARIES
CEMENT CONCREfE
CURB & GUTiER � 314• LIP � �
8' CEMENT CONC.
4• C8TC
SECTION A A
PORTLAND CEMENT CONCRETE
DRIVEWAY APPROACH
AlGaretlOn of tlda drewing 18 proldbfmd ArN ePPrwal of m� etmred �a�n9
le �amu�rlaea m,a ww
3121
� oa�
8/15/OS
TYP9CAL SECTION
�
6"
�
IVOTES
1 FORMS SHALL BE TRUE TO LINE AND GRADE AND SECURELY STAKED �
2 FULL DEPTH EXPANSION JOINTS SHALL BE PLACED ON 10 FOOT CENTERS
3 THRU JOINTS SHALL BE PLACED ADJACENT TO CATCH BASINS, INLETS AND AT POINTS OF TANGENCY ON STREETS, '
ALLEY AND DRIVEWAY RETURNS MAXIMUM SPAGNG SHALL BE ZO FT PREa1AOLDED JOINT FILLER SHALL BE 1R'
WIDE AND CONFORM TO AASHTO DESIGN M213
4 ALL JOIM"S SHALL BE CLEAN AND EDGED
5 CONCRETE SHALL BE CEMENT CONCRETE, CLASS 3000 �
6 STEEL FORMS ONLY SHALL BE USED ON TANGENT SECTIONS WOOD FORMS MAY BE USED ON CURVED SECTIONS
7 FINISH SHALL BE LIGHT BROOM FINISH
8 THE FINISHED CURB SHALL BE SPRAYED WITH A TRANSPARENT CURING COMPOUND AND COVERED BY WATERPROOF '
PAPER OR PLASTIC MEMBRANE IN THE EVENT OF RAIN OR OTHER UNSUITABLE WEATHER CURING T1ME SHALL BE A
MINIMUM OF 72 HOURS
9 ALL CURB AND GUTTER SHALL BE PLACED ON A MIN OF 4' COMPACTED CRUSHED SURFACING TOP COURSE
1
�CI� Of B�I�IAIt0�1 CEMENT CONCRETE
CURB AND GUTTER
PuBUC woRics TYPE A 3131
� amrm�, a uds arew�r� ��w�ed ,nry e�rwm ��, mm�ed �wo-� Rs�on DaD�
EN�INEERBNQ DNISION �su�m,orr�eam,dwid 8/15/08
1
'
�
J
24"
,
,
'
,
'
�
�
1
�
'
�
�
'
,
'
'
,
,
'
1/2' R
�QR _
8■ �
TYPE C-1 CURB
1' R
1/4' R
PAVEMEM
1' R 1' R
r �" r
�d
a a
a �° �r
a
a a
�— �a ---�
TYPE C-3 CURB
.. ..
TYPE C-2 CURB
�� R �� R
6"
2-3/4� 2�/4�
d � °
a d
�s� a a a e
a a a Q <
�---- � � �rr ----�
TYPE C-4 CURB
NOTES
1 ALL MATERIALS SHALL BE WSDOT CLAS.S 3000 CONCRETE.
Clty Of Bre,�e�t
PUBLJC 11MOi�8
ENGINEERING DMSION
CEMENT CONCRETE CURB
TYPE C
Allmatlon of tlde drawing is proldbNed Ary approval d en elCBred �awing
�s �mmm,onzeaendwm
3133
Fia�rlelon oala
8/28✓13
2 MIN
3/8" DIAM GALV HEX
HEAD BOLT, NUT AND
WASHERS LAG SCREW
& WASHERS(TYP )-2 MIN
TELESPAR TRAFFIC
SIGN POST TS-10
2"x2" NOMINAL POS
CURB I
FAC E
� z
�
0 0
o �
o �
0
0
0
0
O
O
O
O
o • .,
0
o /.��/.��/. �/
0
M
o TS-5, TS-8, TS-10,
o TS-12 PER DRAWINGS
0
o (1) 3 /a" GALV ANGLE BOLT
o IN (2) ADJACENT HOLES
0
0
� 3
0
0 1=I llI=L��L
° ���1�111�11�=, III—
0
0
O
o �2
0
0
0
0
LIGHT DUTY ANCHOR
(OUTSIDE OF SIDEWALK AREA)
o TS-5, TS-8, TS-10,
o TS-12 PER DRAWINGS
a
° (1) 3/s" GALV ANGLE BOLT
o IN (2) ADJACENT HOLES
0
0
0 3 ,. CW � o
z=
O — U
� �� ���—� c0 Q
r� � —
NQN—SHRINK
GROUT
BACKFILL
�
N
SEE ANCHOR
DEfAILS THIS SHEET
POST ANCHOR INSTALLATIONS
of Bremerton
w�
�g
o�
=j
r� o
HEAVY DUTY ANCHOR
(SIDEWALK APPLICATION & AS
NOTED BY ENGINEER)
TYPICAL SIGN INSTALLATBON
PuBUC woR�cs
nro� ot uds drewtrp is prddwmd ary eppriwel ar en mB�ee maw6ig
ENGINEERIN� DMSION is �meu�r�ed em vaid
A PYRAMID RAIN CAP SHALL BE
INSTALLED WHERE THE TOP OF
THE SIGN POST IS EXPOSED
ioi /
\ lol /
0
\ I o /
o �
o �
0
0
0
O
0
0
0
0
0
0
0
0
0
0
0
T �
0
0
0
0
0
0
0
3251
ReNision Date
10/12/12
,
�
�
,
'
'
'
'
L �
'
,
'
'
,
�
r
t
NOTE RAMP PORTION OF WHEELCHAIR
CURB RAMP TO BE LOCATED
WITHIN CROSSWALK
cuRS oR �
EDt3E �
PAVEMENT
�
YVHEEL
TRAdC
— LANE WIDTH VARIE3
�� LANE LINE
-- — — � — —
WHEEL
TRA(YC
WHEEL
T�� CENTERLINE�
� �� s�
NOl'E 1
PIANO I�Y MARF4NG
TO BE PARALLEL TO
TRAVELLANE
of Bremerton
NOTES
1 LENGTH OF THE MARIaNGS
OR TO MATCH EXI3TING,
WITH 6' MIN RESIDENTIAL,
AND 9' MIN ARTERIAL
2 MATERIALS FOR CROSSWALK
ARE PLASTIC PER WSDOT
STANDARD SPECIFICATIONS
SECTION 9-34 3
CROSSWALK DESIGN &
PLACEMENT
3257
Rennsion Date
10/12/12
����
}�',,�C 1 Y7� f�e ,,� � •
�������(
� - ., ; •
AI[ere� of ttda drardng � Pradbimd Ary approval of en mmred drawine
�s �a,ew,orlaea ena Mob.
'
� 10' � 30' �T� 10' �
I
4 �. SKIP LINE YELLOW �
SINGLE LANE ROADWAY
4" 4 �. 4 „
50LID YELLOW
MULTH.ANE ROADWAY
LINES SEPARATING DIREC110NAL
FLOW
LINE OF CROSSWALK MARKING
SEE DWG #3257 FOR DETAILS
5� MIN SOLID WHITE�
►
STOP BAR
12" MIN
SKIP LINE YELLOW
4 �� 4" 4" SOLID YELLOW
0
NO PASSING LINE
SOLID WHITE 4 4'� 4"
DOUBLE WHITE LINE
(NO LANE CHANGE PERMIII'ED)
�10'�30'�10'�
4 �. WH ITEJ
uu�e uNes
�3
SOLID WHITE
PAVING EDGE LINE
4 „ 4�� 4��
SKIP LINE YELLOW �
VARIES
o �SOLID YELLOW �
TWO WAY LEFT TURN LANE
VARIES _�13'-0"� ��0'-0"
STOP LINE
� I I
� �
5'-6" APPROACH �
7'-6" LINE 3._0..
5'-0"
END OF APPROACH LINE 5-0"
LEFT TURN LANE
NUMBER OF LEGEND SETS REQUIRED BASED ON THE LENGTH
OF APPROACH LINES
APPROACH LINE LENGTH
LESS THAN 50 FEET
50 FEET-120 FEET
125 FEET-300 FEET
OVER 300 FEET
�� � ���
� i-_ . .:.1:;..:
LEGEND SETS
1 SET AT X—WALK END OF POCKET
2 SETS
3 SETS (SECOND LEGEND LOCATED
MIDWAY BETWEEN FIRST AND LAST LEGENDS)
ADDITIONAL SETS SPACED AT APPROX 100 FT
INTERVALS BETWEEN FIRST AND LAST SETS
STANDARD PAVEMENT MARKINGS
3265
J ao�, or uds draw�r� � pro►damd n�y ePporm a en e�rea mawir� �tielon DeoB
COMMUNITY DEVELOPMENT ��ae,w„aa. 10/12/12
,
,
�
� 9' 10"
,
'
'
�
�
'
'
'
'
'
'
�
12"
u . _ ��.�
.�
.� s ,�
��;����
�w�.GITY�M�j�� , . • ' � l:
�R���� �
. . ••
13'1"
NOTES
1 COLOR SHALL BE WHITE -
2 MATERIALS FOR CROSSWALK ARE PLASTIC
PER WSDOT STANDARD SPECIFICATIONS
SECTION 9-34 3 TYPE A,B, & C ARE FOR
LOCAL AND SUBCOLLECTOR ROADS TYPE D
EXTRUDED ARE FOR ARTERIAL ROADS
3 ARROWS SHALL BE PLACED A MINIMUM OF
24 FT BACK OF STOP BAR
PAVEMENT MARKINGS
ARROW SYMBOLS
AI� of Uda drarring is prddbiEed Ary epproval af m� al�red draMlrg
�s �m,uwr�a ena �om
3267
Fe9YIBI0f1 Dl1�
10/12/12
� ��2„
O
NOTES
1 BASE TO BE PLACED ON A WELL COMPACTED FOUNOATION
2 FRAME AND COVER SHALL BE TESTED FOR ACCURACY OF FIT AND SHALL BE '
MARKED IN SETS FOR DELIVERY RISER RING DIMENSIONS
3 FRAME AND COVER SHALL BE CAST IRON AND HAVE COATING APPLIED TO
ALL FACES
4 CASTINGS IN RIGID PAVEMENT SHALL HAVE REINFORCING STEEL IN THE �S�ZE� 1J�" 2' 3
PAVEMENT '
10 1 /2" DIAM
9 1/2 DIAM '
\�
CONC a °
n a
a d a
o Q
d '
9 a �
0
a I 1 Y E,y R � A S" DIAM "�
o sr
A a d � �\ U 9 ° " 9' DIAM
e � �` '
° '� Z ° � SECTION
� �T �� ,. o 0
� ` oo R o-�� P a RISER RING
° ° 2 � t 9� �
d a
a ° a
d d
° 4 5/8 R
a �
, „�» _� �S DIAM �
y � ��� \
�I I
� ���` c �� DIA �
P LAN ����� "
, �a°
2 DIA (MIN) BRASS DISK �� SECTION OF LETTER 3 � 3 1/4"
� 3 7/8" R 3 3/4" R �
� a SECTION
� a COVER
a� a �
� � I
d � � 5 1�4 R
a 4 3/4 R '
_ a d �� Y2 n
CONC
M -�
� �
d � �
SAND CUSHION I r�
� 6
� °'
PORTLAND CEMENT CONCRETE
a a � 4" R r7 �
�
GROUT
v� �
2"OD GALVANIZED
STEEL PIPE (NOTE 4) � 3 /4 5 3/4 R
° �a y SECTION I
CASE '
SECTION A—A �
City of Bremerton '
PRECAST CONCRETE
MONUMENT 3401 �
I, ; ,,� PUBLJC WORKS Re�nswn oaroe
ENGINEERIN�i DIVISION � ����� ���� 10/12/12
�
�
'
'
'
'
�
'
,
1
r
'
'
1
1
'
r
'
i
�
TOP VIEW-FRAME 8� COVER
BOTTOM VIEW OF COVER
CONFORMS TO APWA PLAN # iB
City of Bremerton
5 --�{ � �
�
27S'
8 '
5
s�
,
3H8'CWUN 15'LON6
%//� ////�i.
�l�
l , I ��,
I/ �
(M1 �rl�%,,,,,..
� i���
;�:.
�.�_�,�_.
SECTION-FRAME 8� COVER
MONUMENT
PUBLIC WORKS FRAME & COVER
ENGINEERING DIVISION a�eraUOn of this drawing is prohibited Arry epprwel of an eltered drawmg
is unauthor¢ed end vad
3402
Rewsion Date
10/22/02
wG�1']LJA1 T P�C\ACNT
/EMENT
VARIES
VARIES
:USHION
OR
:MENT
�URED
BED
7ENT
�ity of Bremerton
PUBLIC WORKS
ENGINEERING DNISION
MONUMENT INSTALLATION
AlteraUOn of this draxnng is prohibded Nry epprovel of a� altered drewing
is unauNior¢ed and vad
3403
Revision Date
10/22/02
�
�
�
'
FRAME AND GRATE
SEE NOTE 9
' . s
• /�
�
� \ 1
' e �
�
1 #3 BAR HOOP
'
�
'
' 2 #3 BAR HOOP3
t
�
'
iq BAR EACH CORNEI
, #3 BqR EACH 31DE
,
�
��
,
6° RISER SECTION
. �
�s
NOTES:
1 CATCH BASINS SHALL BE CONSTRUCTED IN
ACCORDANCE WITH ASTM C478 (AASHTO M 199) 8� C890
UNLESS OTHERWISE SHOWN ON PLANS OR NOTED IN
THE STANDARD SPECIFICATIONS
2 AS AN ACCEPTABLE ALTERNATNE TO REBAR, WELDED
WIRE FABRIC HAVING A MIN AREA OF 012 SQUARE
INCHES PER FOOT MAY BE USED WELDED WIRE
FABRIC SHALL COMPLY TO A3TM A497 (AASHTO M 221)
WIRE FABRIC SHALL NOT BE PLACED IN KNOCKOUTS
3 ALL REINFORCED CAST-IN-PLACE CONCRETE SHALL
BE CLAS3 4000
4 PRECAST BASES SHALL BE FURNISHED WITH CUTOUTS
OR KNOCKOUT3 KNOCKOUTS SHN1 HAVE A WALL
THICKNESS OF 2" MIN ALL PIPE SHALL BE INSTALLED
IN FACTORY PROVIDED IWOCKOIJTS UNUSED
KNOCKOUT3 NEED NOT BE GROUTED IF WALL 13 LEFT
INTACT
6 ROUND KNOCKOUTS MAY BE ON ALL 4 SIDES, WITH
MAX DIAM. OF 20' KNOCKOUTS MAY BE EITHER ROUND
OR'D' SHAPE
7 THE TAPER ON THE SIDES OF THE PRECAST BASE
SECTION AND RISER SECTION SHALL NOT EXCEED
1/2°/FT
8 CATCH BASIN FRAME AND GRATE SHALL BE IN
ACCORDANCE WITH STANDARD DETAILS'THRU CURB
FRAME AND GRATE' 4010 OR �HRU CURB FRAME AND
VANED GRATE"4011 MATING SURFACES SHALL BE
FINI3HED TO ASSURE NON-ROCKING FIT WITH ANY
COVER POSITION
9 NON CONCRETE PIPES SHALL BE INSTALLED WITH A
SANDCOLLAR.
1q BAR EAGi WAY
PRECA3T BASE SECTION
(MEASUREMENT AT THE TOP
OF THE BASE
City of Bremerton
PuBUC woRics
cESeGrucoNS�ucn� sTaronROs
�N
�
5 KNOCKOUTS OR CUTOUTS SHALL BE PER
MANUFACTURERS SPECIFICATIONS
�
/� �
\ �
12'
}
12" RISER SECTION
CATCH BASIN TYPE I
amrmron m mis a�r� re pror��a ay e�pw� a e� mo�ed �ng
����.
4002
Rewsron Date
3/2/07
'
a'����4M�ti
�1.1��;L�?��_� �: �
38'MIN
COVER
��� � � �%\�;��" I
TO ALLOW FOR � MIN
3WEEP OF PIPE —� �
B
C
10°t
3
0
(�E NOTE 4) � PRIVATE
PROPERTY
D ) �. ( E
SEE NOTE 8
CU3TOMER PIPING
POLY OR PVC RATED
FOR 2D0 P31
I�
ti
HORIZONTAL METER INSTALLATION
O CAST IRON 3ERVICE SADDLE W/ S 3 BANDS
WILL BE U3ED ON ALL WATER MAINS
O B 1 1/2' OR 2' CORPORATION 3TOP (CC OR IP} X COMPRE3310N
O C 1 1R' OR 2' HDPE � COPPER TUBING SIZE, HIMOL W/ S 3. INTERNAL POLY
STIFFENER3 W/ 12 GA SOLID COPPER BLUE COATm LOCATE WIRE
O D 1 1f2° OR 2' ANGLE ME7ER VALVE, COMPRE3310N X FLANGE
O E 1 1/2' OR 2' ANGLE METER CHECK VAWE IP X FLANCaE.
O F HDPE METER BOX WITH EJIW #1730 TR N�TER COVERMID3TATES # 1730188
OR RAVEN ME7ER BOX # 17X80X18 OR APPROVED EQUAL
O G METER SETIER W/ BYPA38 MAYBE USED IN PLACE OF D
AND E
NOTES
1 SERVICE LINES 3HALL BE PERPENDICULAR TO THE WATERMAIN, UNLE33 OTHERWISE
APPROVED BY THE ENGINEER. METER SETTERW/ BYPA83 SHALL BE USED ON ALL
DOME371C SERVICE LINES IN PLACE OF �ID �
2 SERVICE SADDLE WILL BE INSTALLED AND CORPORATION 3TOP3 WILL BE TAPPm INTO
AN 'DCI3TING MAIN' 8Y CITY FORCES ONLY
3 AN APPROVED BACIffLOW AS3EMBLY MU3T BE IN3TALLED PER WA DEPT OF HEALTH ON
ALL IRRIGATION SY3TEM3 THE 3Y3TEM SHALL NOT BE PLACED INTO 3ERVICE UNTIL THE
REQUIRED BACFffLOW A33EMBLY IS IN3TALLED (PER CITY STANDARD DETAIL3� TE3TED
AND IN3PECTED BY A CERTIFIED CRO38 CONNECTION CONTROL 3PECWLJ3T
4 THE WATER METER SHALL BE SUPPLJED AND IN3TALLED BY THE BRENN�RRTON PUBLIC
WORK3 AND UTILITIE3 DEPARTMENT ALL OTHER MATERIALS WILL BE SUPPLIED AND
IN3TALLED BY THE CONTRACTOR OR HOMEOWNER, UNLE3.4 DIRECTED OTHERIM3E 8Y
THE ENGINEER WHEN 7HE INSTALLATION 18 CON�LEI'E AND IN3PECTED, 7HE CfTY WILL
MAINTAIN THE 3ERVICE UPSTREAM OF THE METER, INSIDE THE RIGHT OF WAY
5. LOCATE WIRE SHALL BE 12 GA BLUE COATED SOLID COPPER WIRE, 37RIPPED AT BOTH
END3 AND TIGHTLY WRAPPED AROUND (GROUNDED TO) THE CORPORATION 3TOP A
MINIMUM OF lW0 TIMES OR CRIII� TO THE TRACING WIRE ON THE MAIN THE END IN THE
METER BOX 3HALL BE LOOPED AND TUCI�D INSIDE THE BOX.
B METER DIMENSION3 VARY BY 81�.
City of Bremerton
PuBUC wo�Ks
DE8IGWCONSTRUC710N STANDARDS
�
1 1/2" & 2" DOMESTIC/IRRIGATION
SERVICE CONNECTION
arereua, or nds a►sw�ne � p►a�ama n�y �o� or en m�ea m�awu,e
� ��m,a+�a �r,a �oia
�
�
I
'
'
'
c�
�
, I
'
�I
I�I
5003 �
ReN�on oa0�
04/16/13
C
�
�
'
�
�
'
'
,
'
,
'
'
'
'
'
,
,
1
'
DRAIN ROCKTO
PREVENT SILTING
A 1-51/4 M V O HYDRANT WITH 2-21R' N.3.T Alm 5' PUMPBR PORT
W/ STORZ ADAPTER.
HYDR/WT BRAND MODEL STORZ BRAND
MUELLER CENTURION RED HEAD AWG
Mgf{ g2g (NO LOCKS)
B (1) 6° GATE VALVE, AVWVA C-500, R/S, PARALLEL SEAT "O° RING STEM
SEAL, MJ X FLG WITH MEGA-LUGS
C (1) TWO PIECE CAST IRON VALVE BOX SIMILAR TO RICH MANUFACTURING TYPE
940 OR 5" C I SOILS PIPE VALVE BOX IXTENSION
D 8' DUCI7LE IRON PIPE, CLASS 52, (XJT1'O FIT
E MEGA LUG FOLLOWERS
F FULL BODY TAPPING SLEEVE, C I OR D I,
OR HYDRANT TEE (F X MJ)
NOTES
1 FIRE HYDRANT EXTENSION IF REQUIRED
2 FIRE HYDRANT SHALL BE PAINTED WITH ENAMEL SAFETY YELLOW
3. FIRE HYDRANT CAPS SHALL BE COLOR CODED AS FOLLOWS
A HIGH PRESSURE(75* PSI}GREEN
B MEDIUM PRESSURE(50-74 PSI}YELLOW
C LOW PRESSURE(0-49 PSI}RED-IF THE STATIC PRESSURE IS LESS
THAN 20 PSI THEN <20 PSI SHALL BE STENCILED ON TOP OF THE
HYDRANT
4. FIRE HYDRANT BONNET SHALL BE COLOR CODED AS FOLLOWS
A. 1500+ GPM-SAFETY BLUE
B 1000-1499 GPMSAFETY GREEN
C 500-999 GPM-SAFETY ORANGE
D LESS THAN 499 GPM-SAFETY RED (PAINTED BY Clll�
City of Bremerton
PuBUC woRKs
DESIGN/CONSTRUC170N STANDARDS
FIRE HYDRANT DETAIL
Al�n of ttds drewing Ia protdWmd Any aPpwel d en alBared drawhg
is �a,eultarized end vold
TEE(MJ
SLEEVE
a
5081
R�on oat�
�J
PROFILE
62'
C
A WV
U AA
T TL
� EV
o RE
N
ee�
D/gging
Ca/l !/61i1y
locatfi�g
1
5555
, - .. � 11-.
VALVE MARKER POST
NOTES N T S
7 VAWE MARI�R POST TO BE 62' BLUE CAR30NI7'E 3ME UTILITY MARI�R,
JM1�75 OR APPROVED EQUAL WITH CUSTOM DECAL AS SFIOUIM
2 VAWE MARKER P08T 8HAll FACE TF� VALVE
3 VAWE MARKER P08T WILL BE U8ED FOR ALL VAWES OUT8IDE PAVED AREA
4 SOIL ANCHORS WITH HARDWARE MAY BE REQUIRED ON SOME APPLICATIONS
► City of Bremerton
►
� PuBUC woRKs
DESIGPI/CONSTWUC710N STdNDARDB
VALVE MARKER POST
ac�, a n,� drew�r� ��mma an,� eppwai or m, ma�aa mm,a,a
� �r�a��.
5082
�ton oa�
4/07/09
�
�
'
�
�
,
'
'
'
'
'
1
'
,
�
�
'
,
'
G7�1
NOTE:
1 PAINT POST WITH ONE COAT OF PRIMER
AND TWO COATS OF FINISH FINISH PAINT TO
BE EXTERIOR OIL BASE ENAMEL
COLOR TO BE SAFEfI' YELLOW
HYDRANT GUARD POST INSTALLATION
N.T.S.
; City of Bremerton
�
�
a PuBUC woRKs
DE�IQrN/CONSTRUC710N STANDARDB
GUARD POST
ac�«� �r m� a�r� ��onn�a nry aaa�orm �r�r, �a m�wr�e
�s �rtrsd erw vaa
5083
�o�
4/07/�
I �
❑
� �
� MARI�R
� FIRE
FIYDRANT
�— MARI�R
J
� � FIRE
F�1rDFiANT
_ �
MARI�R '
I FIRE
� F�1fDRANT '
'
� �
� '
'
� I �
�
TWO LANE ROAD
OFFSET MARI�R TO INdCATE WHK*1
81DE OF STREET HYDRAM 18 ON.
MASRI�R TO BE PLACED4' TO 8' OFF
CEWTEF�I1�
� I �
MARI�R
I � � FIRE
H1rDRl4NT
4 �
FOUR LANE ROAD
OFF8ET MARI�R TO INDICA7E WHICH
SIDE OF BTREET HYDRANi IS ON.
MMI�R TO BE PLACED 4' TO 8' OFF
THE D0T8 OR PAIMED LII� DMDER
NOTE
(1) MARKER TO BE STIMSONITE 88 AB TWO—WAY (BLUE)
� City of Bremerton
� -
� PUBLJC WORKS
DESIGWCONSTRUCTION STANDARDS
ON SIDE STREETS
vvH� n+e Hrowwr �s wrr►iw av
OF TF� MAIN TRAVELED BTREET, 7}�
MAfi�R IS TO BE INSTALLED 4' TO 8'
OFF THE CENTERI.INE
�� �
�
� �
�
�
��
�
4 I �
�
FNE LANE STREETS
OFFSET MARI�R TO INDICA7E WHICH
SIDE OF STI�ET HYDRANT IS O!L
MARI�R TO BE PlA(�D 4' TO 8' OFF
THE DOTS OR PAINiED LINE DMDER
FIRE HYDRANT MARKER
PLACEMENT DETAIL
ate�lon of uda �ng is prdae�md any epporel o� an el�ed drawing
Is �r�d ana wb.
�
�
� � �
� FIRE e
HYDFiANT
�
1
�
1
,
'
'
5084 '
��
4/07/�
�
'
.._ =i :t•.. �
�
SET COVER OF VALVE BOX
FLUSH WITH C3RADE AND 2'
ABOVE GRADE ELSEWHERE
' '��
� ��N�� � �� �� r
��. ��` �
' PATCH W/ ACP. CLABS B f
HAND TAMP BACIffILL I I
AROUND UPPER SECTION
8' MIN
'
'
'
,
'
C �
'
,
�
LJ
1 I
'
,
,
,
VALVE BOX OR C I
SOILS PIPE EXTENSION
AS REQ'D
JACK HAMMER 8� REMOVE ASPIiALT
CONCRETE PAVEMENT AND RAISE
VALVE BOX
FINISH GRADE
JOINT W/AR4000
CAST IRON VALVE BOX
TOP SECTION
EXTENSION STEM REQ'D WHEN DEPTH
OF OPERATING NUT IS MORE THAN 4
FEET BELOW FINISH t3RADE
GATE VALVE
1 �-2' S� OPERATIN(i NUT
—�1
41/4" DIA ,1/8" MIN
THICKNESS
21/4' INSIDE WID7'H
� �
NOTE8
1 EX7EN810N3 ARE REf]UIRED WHEN 7HE VALVE NUT IS MORE TFIAN FOUR (4) FEET
BELOW FINISHED GRADE EXTENSIONS ARE TO BE A MINIMUM OF ONE (1) FOOT
LONG ONLY ONE D[TENS/ON 7�0 BE UBED PER VALVE
2 VALVE BOX EXTEN810NS 8HALL BE 5' C.I SOILS PIPE-7YLER TY SEAL.
3 ALL EXTENSION8 ARE TO BE MADE OF S7EEL, SIZED AS NOTED, AND PAINTED
VYITH 2 COATS OF METAL PAINT
4 RAI8E THE VALVE BOX TO FlNI8H GRADE AFlER A8PHALT CONCRETE
WpRK IS COMPLETED BUT IN NO CASE LATER THAN 48 HOURS
5 EARS OF THE VALVE BOX TOP SECTION WILL BE INSTALLED INDICATING
WATER MAIN DIRECTION
City of Bremerton
PuBUC woRKs
DESI�iN/CONSTRUC770N BTAND�IRDS
CAST IRON VALVE BOX ASSEMBLY
anerm�«, ar uds arawirg ia prduwmd nny eppousl a en elm�ed �hawtrg
le � arw vow
5120
�lon oam.
4/07/09
CITY 8TD C 1 VALVE BOX ASS'Y
MJ CAP W/ MEGA LUG X 2• I P
GAW PIPE
�����
DLIC'i1L.E
IRON PIPE
RE3TRAINED W/ FIELD
LOCK CA81�T3
0.�
2' CiAW PIPE
2' C I(iATE VAWEaP X IP
wi r o�nnr� Nur
2' BRASS NIPPLE
ELEVA�ION
Nrs
PIPE DIA SOIL TYPE
COHESNE
CLAY SILY GRANULAR
4" 40' 110' 60'
6" 60' 160' 80'
8" 70' 210' 100'
10" 90' 250' 120'
12" 100' 290' 140'
NOTES:
1 BASED ON A TEST PRESSURE OF 250 PSI
2 ASSUMES TYPE 2 LAYING CONDITION W/ SAFEfY FACTOR OF 1 5
3 THIS TABLE DOES NOT APPLY TO POLYWRAPPED PIPE
4 BLOW-0FF A3SEMBLIES TO BE LOC�4TED AT DEAD-ENDS TO BE RESTRAINED BY
PROVIDING FIELD LOK GASKETS IN ORDER TO PROVIDE THE NECESSARY
RESTRAINED LENGTH OF PIPE SHOWN IN THE TABLE.
� City of Bremerton
�
� PUBLJC WO
DESIGN/CONSTRUCi10N STANDARDS
2" BLOW-OFF
ASSEMBLY 5201
aio� ot u,� a�,e ��or�ma ay e�rwm a�, �d �,o
ReNeion Dama
i8 � �a w�a 4/07/09
4• TO THE CAP� 2' C�/1LV PLUC3
� 2' CaALV COUPLING
'
'
'
'
'
'
'
'
'
,
'
'
'
,
'
'
'
'
'
3/4' GROUT SMOOTF
INSIDE 8 OUT
20' MAX WNCRETE BLOCKS
OR PRECAST CONC RINGS
PRECAST RINGS MUST BE CAS"
WITH GROOVE TO FIELD
INSTALL SAFETY STEP
1 ST STEP- MAX 18'
BELOW COVER
CONNECTION TO MANHOI
P V C PIPE REQUIRES A �
COLLAR
CAST CFIAPOda 1All'fH 4000 PSI
CONCRETE. CHANNE18I40F
PIPE DEPTK BLOPE 2% MIN.
NO ORAV� OR BLOqC FOJJI�
NEW SEWER
S',36' OR 48' HIGH PRECAST
:RETE RISER SECTIONS
SECTION
CHANNEL WITH 3000 PSI
:RETE CHANNEL 3/4 OF
DEPTH SLOPE 2% MIN
RAVEL OR BLOCK FILLING
�MPACTED FOUNDATION GRAVEL OR
3/4 MINUS CRUSHED ROpC
CllT OUT TOP OF PIPE
PVC x CONC MANHOLE ADAPTER
�NON SHRINK GROUT
�— EX SEWER
CAST-IN-PLACE SHELF AND CHANNd
MANHOLE BASE SECTION - NEW SADDLE MANHOLE ON EJOSTING SEWER
GENERAL NOTES (APPLY TO ALL MANHOLES)
1 PRECABT 8EC710N3 SHALL BE REINFORCED PER AS7M SPECB FOR
(�RRESPONDINCi BEWERPI�
2 FlBERC�IA39 REINFORCED PLASTIC SAFETY STEPS, 1'
0 MIMMIAYL SEE DEfAIL 80D7
9. 37EPS IN PRECd�ST BASE SEC110N MAY BE CAST IN PLACE OR MOVABLE SAFETY
LAD�R 3ROUTED IN PLACE SEE DETAIL 1iAANHOLE LADDER Alm 3'TEP'
4 ALL HOLES FOR P�PE BHALL BE BLOd�D OUT AT THE i1ME OF CASTINO OF THE
SECTION OR CORE DRILLm IN 7HE FlEID
6. ALL RUBBER CiABKEfED MANHOLEB SHALL BE FURMSHED WITH RUBBER CiASI�TT
JOINT CONFORMINCi TO A371N CAA3.
8 KOR-NSEAL ADAPTORS SHALI. BE i�m
7 MINIMUM 2% �.OPE ACROSS MANHOLP CHANNFl
B. FOR 77' MANHOLE SEE qTY STANWIRD'CATCH BASIN TYPE II' SECTION 4000
'TYPE II CATCH BJ181M
� City of Bremerton
►
Pusuc woRKs
oESi�NVCONS�ucnoN sraNUaH�s
--- -------•--_.......� e .....,...,. �ra� eaos
8TANDARD MAMiOLE
(1NFiERE A STD MANHOLE CANNOT BE
INSTALLED, THE SPECIAL MA1�4 HOLE
SHALL BE DETAILED ON THE
CONSTRUCTION PLANS )
48" TO 60"
STANDARD MANHOLE DETAIL
ar� �r u,� a�ure m�aama nr�y ■� �r � mm�a
d�aiMnp le �tl�o�ed md vdd.
6001
I�rwon o�ls
01/26/12
�
3EE CITY STANDARD'RING AND COVER• ,
!�\�/i\�/�\�/i . �\\j - '
SEE CITY'STANDARD MANHOLE DETAIL•
CORE DRILL AND INSTALL '
�E e � LINIC 3EAL OR 3EAL AS
���� �_ p APPROVED BY THE ENGIN
o PVC WYE '
pqEGqgT 3' MIN ,
RISER '
SECTION 3Q14 P'VC SEWER PIPE
� �
�
�
�
�
� �
NOT LE33 THAN 30' �
� _� 3034 P1/C 3EWEER PIPE �
BA3E �
SECT'ION
� �
48• �
�� PVC 45° BENDS '
�
p " p " p ` p p p ` p SEE CRY STANDARD CONCRETE �
THRUST BLOCKING DETAIL SECTION
5000
CAST CHANNEL WITH
4000 PSI CONCRETE, �q�p FOUNDATION GRAVEL ,
CHANNEL3/4' UP PIPE, pR �' MINUS CRUSHED ROCK
3LOPE 2% MIN, NO
(3RAVEL OR BLOCK FlWNG
,
• FOR GENERAL NOTES SEE CITY "STANDARD MANHOLE DETAIL'
'
� City of Bremerton OUTSIDE DROP STRUCTURE '
�
� � PuBUC woRKs
6004 '
R�lon oet�
DESIaN/CONSTAUC710N STANDARDB amreuw, a,� are� ��� �� �r � m�a � 01 /26/12
�
'
'
'
'
�
'
,
SEE NOTE 1 PFtOVIDE 7HI�E 1' dA LIFT HOLES �t
� FROM CEM'ER OF OOVER SPACED AT',
DKiREES (fYP )
�' �! �•! �! ��,
— — — — —
—1�1�1�1�1�1�1
-I—�—�—�—�—�-1—
I � I � I � I
—
�—I—�—�—�—�--�1—I
,� ��; �; � i � i � i �� j
�� �; � i � i � i ��.�
— — —
�1-1-1-� �
A
r wvs� �rrERs
NONF3IUD INiEGRAL PATiERN TO
BE CAST ON iOP OF COVER
COVER PLAN
RING PLAN
'
�
,
'
,
'
'
'
,
�
1
'
r � �,
�
as•
SECTION A A
DWLLBTA __ .. _w .�
DE(iREEB (1'YP 9PL..)
ze a�e•
�•
zs,a•
� �
� � ��a•
r� �a• c
� 3a ya•
SECTION B-B
COVER NOTE3
1 USE YM71� TFffiEE LOCKING BOLTS Bl8 -11 NC STAINLE88 7YPE 804
87FEL SOdCET HEAD (ALL.EN HEAD) BOLTS, 2' LON(i. d�LL FIOLES
SPAiCED 1Z0°, TO MATCH FIOL.ES IN I�NC,.
2 COVER MA7ERIAL IS DUCTILE IRON ASTM A598 GRADE
80�65-08
3 S W►LL CONFOF�ut TO SEC. 9-05.16 OF 7HE STANQARD SPEqFlCAi10N6,
AS MOdFlED H�INL
4 APPROXIMA7E WEIGHT OF OOVER IS 150 LBS
6 RA71NG - H20
RING NOTES
1 DWLL AND TAP 7HREE 618 -11 NC HOLES 7HR011GF1 WNd AT 120°
2 RING MA7ERULL IS GREY IRON� ASTM A�48 CLASB 30
8 SW1LL COMFORM TO SEQ 9-05.16 OF 7HE STAtmARD
BPEqFlCAilONB, AS MOdFlED F�REJN.
4 APPItOXIMATE YVEIGHT OF RINt3 IS 216 LBS
5 RA71NG - FI�
OLYMPIC FOUNDRY MH30AD/T � OR APPROVED EQUAL.
City of Bremerton
PuBUC woRics
DESIQN/CONSTRUC110N 8TANDARD8
RING AND COVER
am►m� m mis drawi�e � waua�a �uy eparam a en mm�d a�mMr�
le ia�,vwr�ma m,a vob
6005
� oeo�
01/26/12
rw�c.0 i+swnr
�
18° MAX
�
�cr n�TV c•Twunwon ■�NG AND COVER' DETAIL NO 6005
NOTE 1)
NEW OR EXISTING
PRECAST CONCRETE
OR BRICK MANHOLE
RINC� AIVD COVEFZ INSTALL�TION
NTS
NOTES:
1 INSTALL CONCRETE ADJUSTMENT RINGS WITH GROOVES FOR INSTALLING
STEPS IN FIELD CONCRETE BRICKS MAY BE USED FOR LEVELING ONLY
GROUT RING INSIDE AND OUT WITH 3/4' THICK NON-SHRINK GROUT
� City of Bremerton
,,
►
PU BLIC WORKS
�siaNicoHS�ucnoN sraN�
RING AND COVER
INSTALLATION 6006
FieMefon De�
nro�e�on or we a� �s� �e�rwm d�, m�ed �g 01 /26/12
'
'
,
'
'
,
�
�
�
,
'
,
'
�
�
'
�
'
'
���r�
3°
�
SAFETY STEP
3• �
L
48' MAXIMUM
LADDER TO HANG FROM MH 3TEP
FIBERGLA33 REINFORCED PLASTiC
SAFEI'Y 31'EP3
� 8• MIN
�
�
�
PREFABRICATED LADDER
NOTES
1 FIBERGLASS REINFORCED PLASTIC SAFETY STEPS
MINIMUM
2 LADDER REQUIRED IN VAULTS OVER 4' DEEP
3 PROVIDE TRACTION SURFACE ON LADDER STE IN
VAULTS REQUIRING REGULAR ENTRY WHICH ARE
OVER 10' DEEP
City of Bremerton
►
PUBLJC WORKS
oESearucoNSrRUCnoN sraNOar�s
MANHOLE LADDER AND STEP
am►� rn ude a�n� � pradwr�a nry �ro�m a��d �+r�
�a �r�a � wa.
� W
Z
�
W V
Z
� p
� z
O �
� �
z
C�7 �
� �
� �
� �
z� o
J N
6007
ReNelon Det�
01/26/12
��r�
PVC FEMALE PIPE THREADED
HUB ADAP'TER AND PLUG
PAVEMENT OR FINISHED GRADE �
CAST IRON COVER, PER WSDOT
STANDARD PLAN B-18b OR EQUAL,
LABELED °SEWER"
��
COMPACTED BACK FILL
45° BEND
6"ORS" ----�
SEWER PIPE
/���/�\�/�\�/�\�/�\���\���\�//\���\���`� IF LINE DEAD ENDS,
\/i�// �// �///�/,//�/�� yyyE INSTALL WATER7IGHT
THREADED PLUG
STANDARD CL�AIVOUT EIVD OF SEWER iViAIfV DETAIL
NTS
NOTES.
1) PIPE BEDDING. TRENCH BAqC FILL, ETC PER CITY STANDARD "SEWER TRENCH' AND'SEWER PIPE ZONE' DETAILS
2) ALL FITTINGS SHALL BE SOLVENT WELDED
� , City of Bremerton
�'
� PUBLJC WORKS
DESI�iN/COI�ISTRUC170N ST/WDARDS
STANDARD CLEANOUT
END OF SEWER MAIN
aoe�nan or nes arew�r� re praawoea �vy �o� or� ea�ed maw�
�s w�,u,a�ed erw �wa
6025
FieNeion Da6�
8/23/10
�
'
�
1
1
'
�
,
�
�
�
,
'
,
'
,
'
'
'
�
�%:; %%:..�.,,,, , _
;��.,.;�.,.,.;�.,.. �..,,
�; ,. '. ; : , :.. : ; � % S ; 1; :' � � : ,:. ;,
. , . , , , : ' � • , ..: ; � . , . , � . , .. : . , . , , .
"�•�.'.::.,.,;,�•�:;�%:;� �
� �.,5���:�:�•%%,�
��;
� ;;;1 �
��.
�.
..
� .:... :��_
G � �rys
�R�
3EE NOTE31 $ 2 �
e� s�oe sEUV�
TYPICAL (GRAVITY) SIDE SEWER CONNECTION
3'-0' �
r
�
�
�
O.
�
see cinr •srnri� -
CLEANOUT' DETAIL �20
� MIN 2% 3LOPE
f-
8' X 4• REDUC�R BUSHING
CONNECTION AT BUILDING
4'
. ��
° gZ
�
m LL
g � .
NOTES
1 SIDE SEWER CONNECTION TO AN EXISTING MAIN SHALL BE MADE BY CORE
DRILLING THE EXISTING PIPE AND INSTALLING AN INSERT A-TEE ADAPTOR.
2 A SIDE SEWER CONSTRUCTED AS PART OF A MAIN INSTALLATION SHALL BE
INSTALLED WITH A WYE FITTING AND A 45° BEND
3 F�03TING GRADE3 MAY REQUIRE A BACKWATER VALVE SEE BMC 15 03120
� City of Bremerton
p
� PuBUC woRKs
uESi��ucoNSn�ucnoN sraNa►�ns
SIDE SEWER INSTALLATION
(GRAVITY)
AI[eneAbn ot Vda drewing is Pro�ited ArN apprwal of en ePoerBd drmMng
ia �wwr�ea �r,a raa.
6�4�
� oa�
8/23/10
��Iiiilili�iiiii _
Iiiii Iii/ �i1ii �Iiii
i����ij��
�:II �/1 / I i i I q i� 1/ I II I p I� I i� I/I
/ I i�� 1 p i� 1/ I�/ 1��� 1 i i i/ I qi i
I/I/�� Iili�lilil%•�'I/Ii
� q�� 1/II
\._
WLLECTION VAWE BOX
� SEE DETAIL 8120
�
P/���
Rq�
V
PUMP SYSTEM DESKiNED P6t
CITY LOW PRESSURE SE1N62
STAImARDS SEE DETAIL 8101 & 8102
(3RINDER PUMP VALVE
BOX DETAIL 6119
�
TYPICAL PRESSURE SIDE SEWER
INSTALLATION
No�s
1 81fSTEAA SWLLI.00MPLY 1MTH CRY SEWER STAIdDARD8 AIdD CIiY LONV
PRESSURE SEWER DETAIL8 FOR PUMP SY87EM MIMMUM REiIUIREMElVTS.
� City of Bremerton
�
� PU BLJ C W ORKS
DESI�N/CON8TRUC770P! STdWDdRD8
SIDE SEWER INSTALLATION
(PRESSURE) 6042
ni�reua,oruu.d�re��oro�xma ay�pw� orene�am�,� ReNelonDeOa
�e �wb�a er+a raa 02J03/12
�
'
'
'
'
'
�
,
�
,
'
�
'
�
,
'
'
�
�
PIPE
A
D
CORE DRILL OPENING
INTO EXISTING MAIN
MAKE CONNECTION
WITH INSERTATEE
NOTES
1"D", THE INSIDE DIAM OF THE SIDE
SEWER PIPE, SHALL BE 8" OR LESS FOR
LARGER VALUES OF °D", USE A MANHOLE
2 CENTERLINE OF INLET PIPE SHALL BE ON
RADIUS OF MAIN SEWER
3 MAINLINE SHALL BE 8' MINIMUM
DIAMETER.
City of Bremerton
�
� Pusuc woRKs
DESItiN/CONSTRUCTION STAND�IRDS
SECTION A A
<< ��
a 0` °-45°
�1. °1.
END VIEW
SEE CITY 8TANDARD
'PIPE ZONE' DETAIL NO 8081
UNDI87URBED EARTIi
SEWER MAIN
SIDE SEWER CONNECTION TO
EXISTING SEWER MAIN
�m������ ����,��
�s �euu�ea m�d �aa
6043
� oer
01/30/12
M/U� CONNEC710N
WR'H IN8ERTA7EE
GRINpBR PYMP INSTALLATION NOTESa
1 PACKAiOED (�RIl�H3 LffT 8TAT10l1 SHl1LL BE EM/�lRd� 1AODE3. WR?81
AS SUPP�D BY 00(�CT EOUIPM�NT MC.14878 NE 66TH 97fEE�. F�DMOIm.
WA 98062 (4� 88�1?89.
2 PACKA�m BTATmN TO � 7F� FOLLOWa10
/U SEWAf�1E (#tlImER PUMF. BEI�P08I11VE 018P1ACEI�ENT 7NPE
ENVO�ONI�PR W� �SSU70 CAVIiY WrtFi A 1 F�.1800 RPM
MOTOR.
B) CORRUOA7ED F�PE T/WK WI7H 8a1(iI.E P�1 WBfALLA710N
ifE WR?31 18 PACKAQED PI ASMf31.E COI�PLEIE lllQi. F�J1W FOR
INBTALLATION T/WKVYILLNAVEAI-1kl�T�
CONI�CTION /WD A 4 Mpl IlIF� (iROM�T FOR OW V P�E•
� D(IEILiAL G�d( VAWE ASSE66LY
� BREAl1�RR PANEL SHALL INCLIJDE TWO 16 AI� �iEAI�RB FOR
i}E PIA� 8Y8TELA Alm OI� 16 AM� BREAI�R FOR T!� AI.Mi6l
PAI�L FEATUF�B ARE PUBH TO RUN. AlJO�LE ALN�A 1MiX
BLLEMCE BUTIOl6 A!m RED LIOHT ALARM N1MNiES Alm
Cdil�CfaRB ARE OdAR COOED FOR FJ18E OF QISTALIATION
� ffi FEET OF DH�Cf 8t&tY CABLE (SUPPLY CABLE)
3 B.ECTRICAL86MCERECURi9�ENiS
240H10 VOLTB 80r0LE PFU18E POWER WRH 7VY0 POLE 80/11`P BF�AI�R
41MF� CQtQJR R�UR�.
4 OOMRDL PAI�L BHALL BE ATTACF�D TO 7F� ONR�RB Fi0U8E
OR WI1H 7HE CRY9 APPROMAI. ATTACl� TO A 4' z4' P� TREAIED P08T
SET 81NI'O OONCf�IE 6 FEET HKiH FROM FPIISF�D ORADE TO BOT10M OF PANEL
fi SEE TYPiGLL dIiGUR DIA(3RAM FOR WIPoNO BE7Wff7i TF¢ dIM�i3
0�71�Y1011 W B NO 716 OI�AI�t PNI�
6. 6C1� B.BCiRICRL PUNP PAlEL PW0 00lDU1T F10LE(9) FRCM P111�P8 0FC7RICN
PAI� WRX WC� BEAL 70 PFEVENT MOIBRII� OR MBEC18 FROM 6ET1410 NIO
7}E PM�.
7 iF� PQdI&im ORADE 8FYU1 � Fi�E
DRADIRIO AROU/� 8 AWAY FROAA 7F�
TMOC SO BUI�ACE WA78t CJWNOT POIm �-�-���.
GRINOER PUI� PACKAGE
7-1/4' PEMILLE TIUtEAOED FD�
COUR.PIO W&�111(t6E LP�
CCNt�CT TO f�2emER RJNP
d.EAP10UT (SEE DE�A�
4• x d P�l1RE
TfEAiED POBT -
E-0NE BUPPLIED
Bf�AI�lt PAI�
(SEE I�TE 6�
II�ULLL I�W S6ENCE
UIBELTOLOWQt —
L.�f OORNER OF =
PAI� —� _
1' SCH.40 PVC
COMDURAlmF1rT0108 �
(AS RECU�RED)
B.Q
a�
�I �
FOi181FD (�IRRAOE
8EE M07E 7 I
i
EOl� BIFPL� T
C/IBLE OiBmE 80LD I
PECEOFI'
�aow�c roF
�o�ram cov�
_ 1
0
1!6'TML TE$T TEE
� 0101�1 PI� RAII
1� M1� I.AVOIi�
1((�BIC YARD CONCI�7E
AI�FiOR IS REQUIRED 7�D
PF�VENT TANK FROM FLQIITNO -��
UlmIBTURBm W►7NE �
rv►�eu+�
w►mresan.uraFas `
on�vu� r�quo�o
er o� �
a °
9 ° t
� City of Bremerton
►
� PuBUC woRics
�si�N�s�ucnor� sTaN�os
- �_ OASI��TOFir
P�E S�
ORAVI7Y SmE SEINER
NOTE
7) 2% MalOiAUM ORAVITY SmE 3EVYER
MSTALLATION A8 PER C(IY
STAND/1�
2) d.FAWOIl� 8' AMX FROM BULLDOi[a
8) LiF.ANOUT 8FY1LL BE FLUBN WIIH
FlNISHm GRAOE
V�RIFY a�8T�N0 8E1NBt
0{lTLE'T BEFORE
INSTAL�ING GRIN�R
P1lMP TAMC
GRINDER PUMP
INSTALLATION DETAIL
ar�on or uus drew�r,� �e �ama nny e�po�m a�, m�aa a�a,a
����a
6101 �
�ton oe1�
0?�01/12
�
�
1
'
'
'
1
'
,
�
,
'
'
1
1
,
'
,
'
'
6RINDER Pt�MP INSTALLATION NOTES:
1 THE TANK LOCATION SHALL BE ACCE8SI&.E �R MAINTENANCE AND REPAIR
TAN( COVERB SFINl BE APPROIaMATELY 9' ABOVE FlNISHm ORADE FlMSIIED
CiRADE BHALL SLAPE AWAY FROM THE STA710N Alm ARE NOT TO BE LOCATED
WRHIN'POT HOLE3'
2 NO PIAMiB ARE TO BE LOCATED WfTHIN S FEET OF TT�
TAMC. 7HE PROPERTY OWNER SHALL MAINTAIN A 9
dFAR ZONE AROUND TF� TAMC
9 TF� LOCA710N OF 7HE BREAI�R PANEL SHALt. BE
I• . , � - c,
A) ACCEBSIBLE FOR MAIN7ENANCE AND F�PAIR TO COLLECTOR VALVE BOX —
B) VISIBIF FROM THE TANC (8EE DET/1�.) 8120 OR 8121
C) THE BOTTOM OF 7HE PAN0. MI�T BE 9
FROM FlNISHED QliADE, AND
D) THE ALAfUTA LICiHT MUST BE VISIBLE FROM 60 (iRINDER PUMP CLEANOUT —�
FEET AND MU8T BE VIS�LE IN A 780' RADIUS (g� �qa) 8119
4 FENCES, BUSF�3, OR ANY OTHER 08JECT SHALL
NOT HIDE THE LJGHT OR HINDER IN THE
MAINTENANCE ANQ�OR REPAIR OF 7HE SYS7EA1
BREAI�R PANEL, MOUNT ON HOUSE
OR ON POST AS REQUIRED BOTTOM
8�'ABOVEOROUND -
E-0NE SUPPL�D CABLE UISmE
SOLm P�CE OF 1' SGimULE 40
PViC CONDU�T
8' MIN
18' MAX
4• X 4• PRESBURE TREA7ED POLE,
SET 3'-0° INrO COI�K�iE�E
�90 VAC PaWER
SUPPLY 8Y OTHERS
�
�JPPLY CABLE
� DISTANCE VARIES
2b FT �AAX
(AC7UAL ORIENTATION VAR�B)
6RINDER PUMP PLAN
�wr��e srnnoN �
s� Pa� �1 �
owr�ors
DISTRIBlJT10N
PANEL
NEW 2-POLE L1 BLK
90A CIRCUIT L2 BLK
BREAI�R
(?AO VOL� WHT
NEUTRAL
GI�1
CiROUND BUS
�
L2
PU8F1
O TO RUN
�
ac
0
�� ������
���
FROM PUMP
NEUiRAL
OROUIm
BoaRo
NOTE:
�r�mon muec co�dianm m ��e regu�tlorre a n�e oepertrrent ar Laeor ana �naue4lea ana n,e Nenorrel ElecMc
Code. A pemiR and Inepedbne a�e �equlred whether tfle work la peAanned by tha Owner ar a aorltrBCEDr
TYPICAL CIRCUIT DIA6RAM
� j City of Bremerton
? i TYPICAL CIRCUIT
� ' PuBUC wORKS DIAG�►M 6102
a� or uds drewa,a ��d�md nny a�m�m or en m�ed ar�r�
�or� oao�
DESION/CONSTRUC17oN STAND�IRDS �,me,ma�eam,evdd 8/23/10
6w►oE Mus�r s�.o�
AWAY FROM STATION.
DO NOT INBTALL ANY
PL.ANTS WITNIN S° OF
THE TANK. OWNER
MNST MAINTAIN A S'
c�are zoNe.
,�.,•
c�v�
OVER
D18CH.
DISCFIARGE 1-1/4•
NPT, SS
37.5'
DISCH
�— a� r —�
�-- 3o.a —�
57.2'
LATERAI. VE.NT
.— � �'•
IMIERT
DEP7H
56 0'
31.2'
MIN
INLET
IM.Er• EPDM OROAiONET FOR4'
DYV1/ PIPE (CITY STANDiARD,
ABTM D0094)
"SEE E-0NE INSTALLATION INSTRUCTIONS FOR FURTHER DETAILS
FBl7� � tltliiFl CiEA41, OOd� BA�J.. 91fCF0 AB
pA7111E 111178dAL. OR �PORI� BA�7J..
CLAY AND 81LT8 Af� NOT ACCEPTABLE BACI�7LL
'_,1.t .+ . _
NAiNE SOIL UNLESS
07HER1M8E REQUIRED
BY IN8PEC.TOR
7 CUBIC YA(m
CONCRE7E
AWCFIDR
�� �� �� �7� a� �� A� �s��
� ' City of Bremerton
�
�
� PuBUC woRKs
DESI�N/COIdS7'RUC170N STANDARDS
WH231-55
GRINDER PUMP DETAILS
Alteretlon of 1Fds drewirg Ia proFdt�ted Ary epproval d an alBared drawing
Is ia�ed and vok!
6103
Re�lon oa�
02/01/12
�
,
'
,
'
,
'
,
�
'
,
'
,
'
'
,
'
1
'
GRADE TO MATCH
TOP RING
6w�oe Musr s�.ope
AWAY FROM STATION.
DO NOT INSTALL ANY
PLANTS WITMIN 5' OF
THE TANK. OWNER
MU8T MAINTAIN A S'
CLEAR ZONE
��
�
OVER
DISCH
aMOe
c�
99 9'
RT DEPTH
[c�9
DISCHARGE
1-1/4' X 12' BRA33 NIPPLE,
THREADED ON ONE END
a�.g \
DISG1
INLEf �DM GROMMET FOR 4'
DVW PIPE (DISTRICT 3TANDARD,
ASTM D3034)
"SEE E-0NE INSTALLATION IN3TRUC710NS FOR FURTHER DETAIL3
FILL TO GRADE WITH CLEAN, GOMPACTABLE BACIffILL, 8UCH AS
NATNE MATERIAL, OR IMPORTED BACF�ILL —
CLAY AND 31LT8 ARE NOT ACCEPTABLE BACFffILL �
NA71VE —
. . ��!!" ��� � ': �i�`+,
� �-��
_. i
' �_._�"� � . o- - . �u.
v• �.
. - p ��j��`''�1��✓��i���i�����v������G
I - � -� I
City of Bremerton
�� Pusuc woRKs
DESIGN/CONSTRUCTION STANDARDS
WH 231-73
GRINDER PUMP DETAILS
nro�renon or u,m dr� � a►anu�md nry �xv� a en em�red �wtr�p
�e �meun,o�a �,d wb
6104
� oeo�
11/06/09
GRlNDER �UMP INSTALLATION NOTES:
1 PACKAGED DUPLEX GRINDER LIFT STATION SHALL BE ENVIRONMENT ONE MODEL WH 4M 4" x 4 PRESSURE
AS SUPPLIED BY CORRECT EQUIPMENT INC 14576 NE 95TH STREET REDMOND TREATED POST -
WA 98052 (425) 86&7233
E ONE SUPPLIED
2 PACKAGED STATION TO INCLUDE THE FOLLOWINCa BREAKER PANEL
A) TWO SEWAGE GRINDER PUMPS SEMI-POSITIVE DISPLACEMENT TYPE (SEE NOTE 5)
ENVIRONMENT ONE PROGRESSING CAVITY WITH A 1 HP 1800 RPM
MOTOR INSTALL NEW SILENCE
B) CORRUGATED HDPE TANK WITH SINGLE POSITION INSTALLATION �qgEL TO LOWER �
THE WH 472 IS PACKAGED IN A SINGLE COMPLETE UNR READY FOR LEFT CORNER OF
INSTALLATION TANK WILL HAVE A 1-7f4 NPT DISCHARGE PANEL �
CONNECTION AND A 4 INCH INLET GROMMET FOR DWV PIPE
C) INTERNAL CHECK VALVE ASSEMBLY
D) BREAKER PANEL SHALL INCLUDE TWO 15 AMP BREAKERS FOR
THE PUMP SYSTEM AND ONE 15 AMP BREAKER FOR THE ALARM
PANEL FEATURES ARE PUSH TO RUN AUDIBLE ALARM WITH
SILENCE BUTTON AND RED LIGHT ALARM ALL WIRES AND
CONNECTORS ARE COLOR CODED FOR EASE OF INSTALLATION 1 SCH 40 PVC
E) 25 FEET OF DIRECT BURY CABLE (SUPPLY CABLE) �NDUIT AND FITTINGS �
(AS RE�UIRED)
3 ELECTRICAL SERVICE REQUIREMENTS
240/120 VOLTS SINGLE PHASE POWER WITH TWO POLE 30 AMP BREAKER
4 WIRE CIRCUIT REQUIRED
4 CONTROL PANEL SHALL BE ATTACHED TO THE OWNER S HOUSE
OR WITH THE CITVS APPROVAL ATTACHED TO A 4" x 4" PRESSURE TREATED POST 5 0
SET 3' INTO CANCRETE 5 FEET HIGH FROM FINISHED GRADE TO BOTTOM OF PANEL
5 SEE DETAIL 6102 TYPICAI CIRCUIT DIAGRAM FOR WIRING BETWEEN THE OWNER S
DISTRIBUTION PANEL AND THE BREAKER PANEL
6 E ONE ELECTRICAL PUMP PANEL PLUG CANDUIT HOLE(S) FROM PUMP 8 ELECTRICAL
PANEI WITH DUCT SEAL TO PREVENT MOISTURE OR INSECTS FROM GETTING INTO
THE PANEL
7 THE FINISHED GRADE SHALL BE FREE
DRAINING AROUND &AWAY FROM THE
TANK SO SURFACE WATER CANNOT POND
GRINDER PUMP PACKAGE
L
1 1/4 FEMALE THREADED FIXED �
COUPLING DISCHARGE LINE
CONNECT TO GRINDER PUMP
CLEANOUT (SEE DETAIL)
SEE GRINDER PUMP PLAN �
FOR SrSTEM LA70UT
1 1@ CUBIC YARD CONCRETE
ANCHOR IS REQUIRED TO
PREVENT TANK FROM FLOATING
UNDISTURBED NATIVE��� �� ^
MATERIAL �\�
�'j /
\�� \
NATIVE SOIL UNLESS OTHERWISE �� �
REQUIRED BY INSPECTOR
�
CONCRETE BLC
� City of Bremerton
a
r„�,�'� PUBLIC WORKS
DESIGN/CONSTRUCTION STANDARDS
FINISHED GRADE
SEE NOTE 7
E ONE SUPPLIED T '.
CABLE INSIDE SOLID I
PIECE OF 7"
SCHEDULE 40 PVC 2° OF
CONDUIT COVER
�
I
ce
INSTALL TEST TEE
NEW SIDE SEWERS OR
AS REQUIRED 8Y CITV
0
■��■■�
ASTM 3034
GASKET TO FIT �
PIPE SIZE
GRAVITY SIDE SEWER
NOTE
1) 2% MINIMUM GRAVI7Y SIDE SEWER
INSTALLATION AS PER CITY
STANDARDS
2) CLEANOUT 3 MAX FROM BUILDING
3) CLEANOUT SHALL BE FLUSH WITH
FINISHED GRADE
VERIFY EXISTING SEWER
OUTLET BEFORE
INSTALLING GRINDER
PUMP TANK
DUPLEX GRINDER PUMP
INSTALLATION DETAIL
Alteration of this drawing is prohibited Any approval of an altered dra�nnng
is unauthorized and void
6110
Revision Date
10/31 /13
�
1
'
'
'
'
'
'
�
'
'
'
'
,
'
,
'
1
1
GRADE MUST SLOPE AWAY
FROM STATION. DO NOT
INSTALL ANY PLANTS YYITHIN 5'
OF TIiE TANK. OWNER MUST
MAINTAIN A 5' CLEAR ZONE. �
as o"
COVER
OVER
DISCH
DISCHARGE 1-1/4"
NPT SS
38 4°
DISCH
44 3°
INVERT
DEPTH
32 8"
INLET
77 1"
0 47 5" INLET EPDM GROMMET FOR 4"
DVW PIPE (CITY STANDARD,
ASTM D3034)
0 51 4"
"SEE E-0NE INSTALLATION INSTRUCTIONS FOR FURTHER DETAILS
FILL TO GRADE WITH CLEAN, COMPACTABLE BACKFILL, SUCH AS NATIVE MATERIAL, OR
IMPORTED BACKFILL CLAY AND SILTS ARE NOT ACCEPTABLE BACKFILL
FILL TO GRADE WITH CLEAN,
NATIVE — COMPACTAB�E BACKFILL, SUCH AS
NATNE MATERIAL OR IMPORTED
BACKFILL CLAY AND SiLTS ARE NOT
ACCEPTABLE BACKFILL
BACKFII
UNDISTURBE
EARTH
1 YZ CUBIC YARD
CONCREfE
ANCHOR
CONCRETE BLOCK;
NATIVE SOIL UNLESS
OTHERWISE REQUIRED
BYINSPECTOR
E-ONE MODEL WH 472-77, 77° DUPLEX GRINDER PUMP SYSTEM
� City of Bremerton
�
� ",�`a �� ���'_
> � � PUBLIC WORKS
DESIGN/CONSTRUCTION STANDARDS
LATERALVENT
WH472-77
GRINDER PUMP DETAILS 6111
Revision Date
Alteration of this draHnng is prohibded My approval of an altered drawing
is unauthonzed and void 10/31 /13
r_onno Tn ��erru
GRADE MUST SLOPE
AWAY FROM STATIOI
DO NOT INSTALL ANl
PLANTS WITNIN 5' OI
THE TAa1K. OWNER
MUST MAINTAIN A 5
CLEAR ZONE.
DISCHARGE
1-1/4" X 12" BRASS NIPPLE,
THREADED ON ONE END
4"
�RD
NATIVE -
BACKFI I
UNDISTURBE
EARTH
1 Yz CUBIC YARD
CANCRETE
ANCHOR
) GRADE WITH CLEAN
'ABLE BACKFILL SUCH AS
�ATERIAL, OR IMPORTED
CLAY AND SILTS ARE NOT
:EPTABLE BACKFILL
NATIVE SOIL UNLESS
OTHERWISE REQUIRED
BYINSPECTOR
CONCRETE BLOCKS ��
E-ONE MODEL WH 472-92 92° GRINDER PUMP SYSTEM
, � City of Bremerton
�
��,,;,;
4 y 5�`_ PUBLIC WORKS
DESIGN/CONSTRUCTION STANDARDS
WH 472-92
GRINDER PUMP DETAILS 6112
Rewsion Date
Altera4on of this drawing is prohibited My approval of an altered dravnng
is unauthonzed and wid 10/31 /13
"SEE E-ONE INSTALLATION INSTRUCTIONS FOR FURTHER DETAILS
�
�
'
,
�
1
'
,
�
,
'
,
,
�
'
�
'
'
'
MATERIAL LIST
ALL �'Y� wILL a� e0 AI� 71■1■A�
t. 4+1� POLYE71iYLBE Pii�1�iE PPE �R 11
p,@IQIM 7D81�)
• Z 1-CMi80N.���Bm(�ART�17�1
• S. 1-CNi90N Lp�17a0 YMI� �
4. 1�IM'X�'l�PLEPYC
a s -1r1M'S1d�(fl/iD88PXPEEDPq
a s-�ueu�ao�+e�uvKVewic
� s-�r �e�n�xNUS�et
e z - �-��a• as° e�os
9 1- 1 1/4'VYYE
• 87R�T UBE RBa1�68 F�ii18 �i Odi��RE7E 9m(AI�D 7RAFFx: BEAR/i0 LD �� LaD�I�
ALL PVC WILL BE SCHEDULE 80 AND THREADED
= iri-
TRACER WIRE INSULATED 12 GAUGE —
GREEN COATED WIRE (SOLID CORE) TO
BE WRAPPED AROUND THE PIPE FROM
COLLECTOR MAINLINE AND CONTINUE
WIRE TO GRINDER PUMP CLEANOUT (AS
SHOWN)
FROM PUMP TANK
ii—iii —
a
ir—ii,
� TO COLLEC710N
� VALVE BOX
6RINDER PUMP VALVE BOX CLEAN-OUT DETAIL-NEAR PUMP TANK
� City of Bremerton
�
q
� � PuBUC woRrcs
DESIGWCONSTRUCTION STANDARDS
GRINDER PUMP VALVE BOX
CLEAN-OUT 6119
STANDARD DETAILS
� oe�
ao�n«, a uda � �s�a+y �eapwe ' a en m�m � 02/01 /� 2
�
MATERIAL u8T
w� � PVC 1NILL BE SGMEDYLE 80
ano TMRenoen
1 CARSON JUMBO BOX (PART#1730)
3TACK AS REQUIRED
� 2 1 - CAR30N LID (YARI�'�
9 1-1/4• POLYE�FIYI..9dE P� PIPE
� SDR 11(LBdtiT'H'TO SUI'n
4 1- S78 MPr (TH� SS IP X PE FmPE)
8 1-1-1/4' x 3' NIPPLE (PV�C)
8 1-1-1/4' UMON BALL VALVE (PV'C)
7 1-1-1/4' BRASS 8WIN0 CHECK VALVE
8 1- REDUCER SDR 11 (SI� TO SUI'T)
9 1- TEE SDR 11(81ZE TO SLA'n
10 1- FEAAALE PIPE THREAD X HUB AD/1PTER
11 1- 1 1/4' 45 ° BEND
121- 1 1/4' WYE
18 1- 1 1/4° OOMPREBSION OOUW.INO
14 1- 1 1/4' MALE PIPE 7FOiEAD X HUB A�WPIER
L�
,
�7
'
'
//=i// _
FROM
�tlNOElt —iii - e =iii -
P6!!�P �
CLEANONT J
TRACER WIRE IN8ULATED 12 GAUGE
GREEN COA7ED WIRE (SOLJD CORE) TO
BE WRAPPED AROUND THE PIPE FROM
COLLECTOR MAINLINE AND WNTiNUE
WIRE TO GRIImER PUMP CLEANOUT (AS
SHOWN}
// // =
� O O
:.;� ��1��`�
- - -i=
,
�
��
�
�
�
I�IOTE:
1. CUT�1 COME�G710NB � 7N11CBt W�68 70 ■E BPLIC� 7�71�t
USING GiQPP AG� C.."°�T41.�:0 �'�QC3QC3�
Z FOIR OR IIO�iE 8T/1C1� IiE76t B�B
YAY E R� FOR G�IH
S. CAR�Q�1 BmCC BFIALL BE wllfil�
F�t '�!.
• STREET USE REQUIRES FOG7ITE #� CONCRETE BOX AND SOLID TRAFFIC BEARING LID (H-20 LOADING)
S�ID TRAFFIC BEARING LID (F�20 LOADING) MARI�D'SENI�'
COLLECTION VALVE �OX AT PROPERTY LINE OR EDGE OF PAVEMENT
City of Bremerton
PuBUC woRics
COLLECTION VALVE BOX
CLEAN-0UT
STANDARD DETAIL
DESIGN/CONSTRUC110N STANDiARDS
a� m nda mew� �a wadamd ay eawwm a en m�d a�
�e �u�rwr�ed m,a �da.
�
�
��
'
�
6120 '
� oe�
02/01/12
�
�
,
'
'
'
,
CI7'Y 8TA1� C.I. -
VALVE BQXA�BLY
1' POLY PIPE �
� NOTE 4 �
3EE NOTE 3
DOSr0�l0 8E11VBt 1AI11N
NOTE:
�• c�v. �eo� o� r�rur� ea�
�• eman� snz►o�
�• c�n�v ar� 4o n�nom �
�• cn�v Eu.s
HDPE BOX WITH D I LID
1• ODER CONTROL MODULE
� �
.� r_Ow
S� �E B ��
4• x a• �►rm Posr
sraN.sss sr� sn�.
secu� r cc�n�v ro Posr
�\��\� l �������� 2'-0° MIN
- - �• cn�v ��, niRenom
1"
1' BRA33 NIPPLE OR PVC
S� NORE 2
1' 001�. X MALE IP ADVNI6Z
W / 8.8. POLY STIFFB�Bt
1• POLY P�E WR1� 12 QA C�R�1
C0�11'ED OOPPER LOCA7E WIIiE
1' COMP X MALE IP ADAPTER
30LID (:aNCREIE BRICK
r on� va�ve wi r o�w�►rNO Nur �x �
r ao� x � � aosnpra�
W/8.8.POLY8�
�
'
�
'
'
'
1
'
1
ELEVATION
n�s
1 USE APPROVED JOINT COMPOUND ON ALL THREADED CONNECTIONS
2 AIRNAC TO BE BURIED AS SHOWN FOR FREEZE PROTECTION USE CRISPIN US10B, ZQ750 WORlaNG PRESSURE, �" ORIFICE
OR APPROVED EQUAL LOCATION OF RISER SECTION TO BE APPROVED BY ENGINEER PRIOR TO INSTALLATION
3 TAP D I SEWER MAINS USING 1" BRASS CORPORATION STOP USE STAINLESS STEEL TAPPING SLEEVE ON PVC MAINS BRAND
AND MODEL NUMBER TAPPING SLEEVE TO BE APPROVED BY THE ENGINEER PRIOR TO CON3TRUCTION
4 LOCATE WIRE SHALL BE 12 GA. GREEN COATED SOLID COPPER WIRE, STRIPPED AT BOTH ENDS AND TIGHTLY WRAPPED
AROUND (GROUNDED TO) THE CORPORATION STOP A MINIMUM OF 2 TIN�S OR CRIMPED TO THE LOCATING WIRE ON THE MAIN
LOOP AND TUCK EXCESS LOCATE WIRE NEATLY INSIDE N�TER BOX.
5 ALL FITTINGS TO BE BRASS UNLE3S OTHERWISE NOTED
B 1' GALVANI�D PIPE ABOVE GRADE TO BE PAINTED WITH 2 COATS RUSTOLEUM HIGH GLOSS GREEN PAINT
' 7 AIR AND VACUUM RELEASE VALVE ASSEMBLY MUST BE INSTALLED AT HIGHEST POINT IN MAIN IF THE HIGH POINT FALLS IN A
LOCATION WHERE ASSEMBLY CANNOT BE INSTALLED, MAINTAIN ELEVATION OF MPJN TO CREATE HIGH POINT AT A LOCATION
WHERE AIRNAC ASSEMBLY CAN BE INSTALLED PHYSICAL LOCATIQN OF TAP AND AIRNAC TO BE APPROVED BY THE ENGINEER
PRIOR TO CONSTRUCTION
'
'
City of Bremerton
PuBUC woRKs
1" AIR 8� VACUUM RELEASE VALVE
ASSEMBLY FOR 10" AND SMALLER
LOW PRESSURE SEWER MAINS
I I DESION/CON8TRUC710N STANDARDS I aro� m nde drewme �a prddwoed nry e�ro� a�, �mred aaw�
' �s �rmwrw�ed em �aa.
6128
� o.�
2/25/10
u
C ��
i
1
�
IJ
�
'
�
,
�
�
'
,
�
'
'
'
APPENDIX C
WSDOT STANDARD PLANS
II
1
St
1 3/B" EXPANSION JOINT (TYP p�
SEE STANDARD PLAN F-3010
4' - 0" MIN - �
TRACT PIANS
LANDING -� I
'
CURB AND GUTTER �
' o
N
4'-0"MIN (TYP)�
' SEE CONTRACT PLANS
CURB RAMP -
FACE OF CURB
' J
J
w
0
�
J
' Z
�
w
�
r
m
' �
0
'
'
�
1
SIDEWALK
'
�' °� ±
� N `
$
_ t �
�
� � CURB RAMP
p ` DETECTABLE WARNING SURFACE -
, SEE STANDARD PLAN F�510
� DEPRESSED CURB 8� GUTTER
CROSSWALK
I '
I
PLAN VIEW
TYPE PARALLEL A
CEMENT CONCRETE PEDESTRIAN
CURB � SEE NOTE 9
15' - 0" MAX
SEE NOTE 7
- GRADE BREAK �
d s s% nnax
� � CURB RAMP
4'-0"MIN
CONTRACT
SEE
PEDESTRIAN CURB - �8 �PANSION JOINT (TYP ) - _
SEE NOTE 9 SEE STANDARD PLAN F�30 10
B
SIDEWALK
DETECTABLE WARNING SURFACE -
SEE STANDARD PLAN F-45 10
4' - 0" MIN
SEE CONTRACT PLANS
a
�� � '� � 2 0% MAX
SIDEWALK
! I `
� LANDING
>
SECTION OA
15' - 0" MAX
i SEE NOTE 7
GRADE BREAK
8�
.
CURB RAMP
LANDING
4' - U_� M�N�
2ACT PLANS
IANDING
r �
0
� N �
NOTES �
A�'
1 Provide a separate Curb Ramp for each marked or unmarked crosswalk
PEDESTRIAN CURB - Curb Ramp locat�on shall be placed within the width of the associated
, SEE NOTE 9 crosswalk, or as shown in the Contract Plans
2 Where "GRADE BREAK" is called out, the entire length of the grade
� break beiween the two ad�acent surface planes shall be flush
,, 3 Do not place,Gratings, Junction Boxes, Access Covers, or other appurte-
— - rC f nances in front of the Curb Ramp or on any part of the Curb Ramp or
3 „� Landmg
~,,,, 4 See Contract Plans for the curb design specified See Standard Plan
F-10.12 for Curb, Curb and Gutter, Depressed Curb and Gutter, and
Pedestrian Curb detads
DETECTABLE WARNING SURFACE �
SEE STANDARD PLAN F�610 5 See Standard Plan F-30.10 for Cement Concrete Sidewalk Detads
` See Contract Plans for width and placement of sidewalk
� DEPRESSED CURB & GUTTER 6 The Bid Item " Cement Concrete Curb Ramp Type _ does not include
��
CROSSWALK the ad�acent Curb, Curb and Gutter, Depressed Curb and Gutter, Pedestnan
, Curb, or Sidewalks
' 7 The Curb Ramp maximum runrnng slope shall not require the ramp length
PLAN VIEW to exceed 15 feet to avoid chasing the slope indefinitely when connectmg
TYPE PARALLEL B to steep grades When applying the 15-foot max length, the running slope
TOP OF
ROADWAY
DEPRESSED CURB 8 GUTTER �
SEE STANDARD PLAN F-10 12
AND NOTE 6
SIDEWALK
of the curb ramp shall be as flat as fieasible
8 Curb Ramp, Landmg, and Flares shall receroe broom firnsh See Standard
Specifications 8-14.
9 Pedestnan Curb may be omitted if the ground surface at the back of the
Curb Ramp and/or Landing wdl be at the same elevation as the Curb
Ramp or Landing and there wdl be no mater�al to retain
15' - 0" MAX
SEE NOTE 7
r- GRADE BREAK
8 39�o MAX 'vl�
2 0% MAX
' � 3/8" EXPANSION JOINT (TYP ) �
SEE STANDARD PLAN F-3010
SECTION OB
'
"CEMENT CONCRET� - -- — �--
PARALLEL A" PAY l
'
1
1
'
CURB RAMP
3/8" EXPANSION JOINT (TYP ) -
SEE STANDARD PLAN F-3010
4� - a� nni�.
CONTRACT PLANS
- GRADE BREAK
2 0% MAX ,�
LANDING
SECTION OC
LEGEND
PEDESTRIAN CURB �
SEE NQTE 9
�
i
"CEMENT CONCRETE CURB RAMP TYPE
PARALLELE
TYPE PARALLEL A PAY LIMIT
`- GRADE BREAK
COUNTER S�OPE
5 0% MAX
CURB & GUTTER J �
CURB RAMP
4' - 0" MIN (TYP ) �
SEE CONTRACT PLANS
FACE OF CURB
ISOMETRIC VIEW
TYPE PARALLEL B PAY LIMIT
i
i
SLOPE IN EITHER DIRECTION
��TRj �
ti
4,���OQ WAS�� ,� 8 ����
�� c�'�� � ., `�1� �`�� � � � 8
W '� ����
��o`�
A � $����
�O� �� 34363 �O ��► q � $
� �tsT�� G ti � ���
s ��NAL �� �����
g���e
PARALLEL CURB RAMP
STANDARD PLAN F-40.12-02
SHEET 1 OF 1 SHEET
APPROVED FOR PUBLICATION
Pasco Bakotich Ill 6/20/13
STATE DESIGN ENG�NEER �A�
� Washmgton Stafe Deparfmant of Twnsporlalwn
��/
i
e
J
J
W
C
0
J
z
�
w
�
' m
�
,�
�
A
B i
1
1
���
CEMENT CONCRETE
' PEDESTRIAN CURB � �
SEE NOTE 9 Y 6 ►
CEMENT CONCRETE
' CURB 8 GUTTER �
SEE NOTES 4 & 6
DETECTABLE WARNING SURFACE — �
SEE STANDARD PLAN F�5 70
1
I
4' - 0" MIN — SEE
CONTRACT PLANS CEMENT CONCRETE
� LANDING PEDESTRIAN CURB
CURB RAMP — SEE NOTE 9
� MATCH SIDEWALK (4' - 0" MIN DETECTABLE WARNING SURFACE —�
) "' SEE STANDARD PLAN F-4510
� SEE CONTRACT PLANS
� ���
� `��
� �� t
I.-
��
___ _ ___�_
I
�
' PLAN VIEW
TYPE COMBINATION
WITH BUFFER
'
,
�
'
'
'
1
1
'
CEMENT CONCRETE
PEDESTRIAN CURB —
SEE NOTE 9
CURB RAMP
CEMENT CONCRETE
PEDESTRIAN CURB —
SEE NOTE 9
SECTION AO
3/8" EXPANSION JOINT (TYP ) �
SEE STANDARD PLAN F-3010
BUFFER STRIP (TYP ) —
SEE CONTRACT PLANS
DEPRESSED CURB 8 GUTTER �
SEE NOTES 4 8 6
CURB RAMP � 4' - 0" MIN
SEE CONTRACT PLANS
I � 2 U N 111�M
. p • � ' . _
' CEMENT CONCRETE PEDESTRIAN
CURB (TYP ) � SEE NOTE 9
I�
15' - 0° MAX
SEE NOTE 7
GRADE
` BREAK
83%
D
CURB RAMP
4'-0"MIN
SEE CONTRACT PLANS
� 2 0% MAX 'v �
D � p �
LANDING
3' - 0" MIN — SEE
BUFFER
STRIP
r�_
D .
SECTION OB
F .. ..� . . I ���, \,�,
CEMENT CONCRETE CURB
AND GUTTER — SEE NOTES 4 8 6
DETECTABLE WARNING SURFACE �
SEE STANDARD PLAN F�610
� GRADE BREAK
COUNTER SLOPE TOP OF
5 p"/ MPJ� ROADWAY
� 7�� /�r?�'�_
DEPRESSED CURB AND GUTTER �
SEE STANDARD PLAN F-101� AND NOTE 8
DEPRESSED CURB AND
GUTTER — SEE NOTES 4 8� 6
TOP OF
ROADWAY
CEMENT CONCRETE CURB AND
GUTTER � SEE NOTES 4 8 6
DETAIL OD
CURB RADIUS DETAIL
15' - 0" MAX
SEE NOTE 7
GRADE BREAK—
9 3% MAX
3" R
�P )
0
NOTES
1 Prov�de a separate Curb Ramp for each marked or unmarked crosswalk Curb Ramp
locat�on shall be placed within the width of the associated crosswalk or as shown in the
Contract Plans
2 Where "GRADE BREAFC' is called out, the entire length of the grade break between the two
ad�acent surface planes shall be flush
3 Do not place Grat�ngs, Junction Boxes, Access Covers, or other appurtenances m frorrt of
the Curb Ramp or on any part of the Curb Ramp or Landing
4 See Contract Plans for the curb design specified See Standard Plan F-10.12 for Curb,
Curb and Gutter, Depressed Curb, Gutter and Pedestnan Curb detads
5 See Standard Plan F-3010 for Cement Concrete S�dewalk Detads See Contract Plans
for width and placement of sidewalk
6 The Bid Item "Cement Concrete Curb Ramp Type _' does not include the ad�acent Curb,
Curb and Gutter, Depressed Curb and Gutter, Pedestnan Curb, or Sidewalks
7 The Curb Ramp maximum runrnng slope shall not reqwre the ramp length to exceed 15 feet
to avoid chasing the slope mdefindely when connecting to steep grades When applying the
15-foot max length, the runrnng slope of the Curb Ramp shall be as flat as feasible
8 Curt� Ramp, Landing and Flares shall receive broom firnsh See Standard Specifications 8-14.
9 Pedestrian Curb may be omitted if the ground surface at the badc of the Curb Ramp and/or
Landmg v�nll be at the same elevation as the Curb Ramp or Landing and there �nnll not be
material to retain
LEGEND
— � SLOPE IN EITHER DIRECTION
4'-0"MIN 15'-0" MAX
SEE CONTRACT PLANS SEE NOTE 7
GRADE BREAK
2 0% MAX _ `r � 8 �
� < � A • C w
� CURB RAMP �-- �qNDING
3/8" EXPANSION JOINT (TYP } �
SEE STANDARD PLAN F-3010
SECTION OC
J�
"CEMENT CONCRETE CURB RAMP TYPE
COMBINATION" PAY LIMIT — SEE NOTE 6
� J�
.� �
iso�nErwc v�Ew
TYPE COMBINATION
PAY LIMIT
I
1
�
�
CURB RAMP 4 �TRI � � � �, �
4,� �og r�.sq�� ,� �����
'� � `�' `� a � 4
�� �� � , � �� ����8
� ��� �
� �
•o � F �'Z�
�O � 34363 O � $����
'A� N CISTBR�' G 1� �����
� �� �����
�ua�`�
gm��8
COMBINATION CURB RAMP
STANDARD PLAN F-40.14-02
SHEET 1 OF 1 SHEET
APPROVED FOR PUBLICATION
Pasco Bakotich lll 6/20H3
STATE DESIGN ENGINEER DATE
� Wosh�ngton STate Daparlment of Transpoefalwn
�//
� J
J
w
0
0
, J
z
�
w
LL LANDING
m
� GRADE BREAK �
SEE CONTRACT PLANS -
� 4'-0"MIN
0
' CEMENT CONCRETE
SIDEWALK - SEE NOTE 5
J
FLARE (TY� ) �
3/8" EXPANSION
JdINT (TYP ) - SEE
STANDARD PLAPI F-3010 �
, GRADE BREAK �
CURB, OR CURB �`
, AND GUTTER -
SEE NOTE 4
, FACE OF CURB -�
MEASURED PARALLEL
TO CURB (TYP )
�
e
,
SLOPE TREATMENT �
' SEE STANDARD PLAN F-3010
'
�
'
'
'
'
'
A
I
� /
I
2 0� nnax
i
I
10 0%� I''
-�'_ '
�
CURB RAMP WIDTH 4' - 0" MIN LANDING TO MATCH
� CURB RAMP WIDTH � SEE CONTRACT PLANS
GRADE BREAK LANDING -
SEE CONTRACT PLANS - CURB RAMP
4' - 0" MIN CEMENT CONCRETE SIDEWALK -
SEE NOTE 5
PROVIDE SMOOTH
TRANSITION TO
SIDEWALK SEE CONTRACT PLANS �
WIDTH (TYP ) 4' - 0" MIN
�
3/8" EXPANSION
JOINT (TYP ) - SEE
CURB RAMP STANDARD PLAPI F-3010
v,,
GRADE
BREAK TRANSITION TO SIDEWALK BUFFER, IF
PRESENT, OR TO BACK OF CURB (TYP )-
SEE CONTRACT PLANS ��„
100% � � " ° �" v`,
� _�..�-w-
- - � CURB, OR CURB
- µ `""' � AND GUTTER -
�DETECTABLE WARNING SURFACE � SEE NOTE 4
SEE STANDARD PIAN F-4510
� � DEPRESSED CURB AND GUTTER �
CROSSWALK SEE NOTE 4
�
PU4N VIEW
TYPE PERPENDICULAR A
LANDING
DETECTABLE WARNING SURFACE -
SEE STANDARD PLAN F-4510
4'-0"MIN _i_ 15'-0"MAX
SEE CONTRACT PLANS SEE NOTE 7
GRADE BREAK
2 0°r6 M�NC 8 3% MAX
o . .
e e �
CURB RAMP � �
SECTION O
FACE OF CURB
CEMENT CONCRETE
PEDESTRIAN CURB �
SEE NOTE 4
NOTES
1 Provide a separate Curb Ramp for each marked or unmarked crosswalk
Curt� Ramp location shall be placed within the width of the assoaated
crosswalk or as shown in the Contrack Plans
2 Where "GRADE BREAIC' is called out, the entire length of the grade
break between the finro ad�acent surface planes shall be flush
3 Do not place Grat�ngs, Junction Boxes, Access Covers, or other appurte-
nances in front of the Curb Ramp or on any part of the Curb Ramp or
Landing
4 See the Contract Plans for the curb des�gn specified See Standard Plan
F-10.12 for Curb, Curb and Gutter, Depressed Curb and Gutter, and
Pedestrian Curb detads
5 See Standard Pian F-30.10 for Cement Concrete Sidewalk detads
See Contract Plans for width and placement of sidewalk
6 The Bid Item Cement Concrete Curb Ramp Type _' does not include
the ad�acent Curb, Cu[ti and Gutter, Depressed Curb and Gutter,
Pedestrian Curb, or Sidewalk
7 The Curb Ramp maximum runnmg slope shali not reqwre the ramp length
to exceed 15-fieet to avoid chasmg the slope �ndefinitely when connectmg
to steep grades When applying the 15-foot maximum length, the runrnng
siope of the Curb Ramp shall as flat as feasible
8 Curt� Ramp, Landmg, and Flares shall receive broom finish See
S�ndard Specificat�ons 8-14
LEGEND
- — SLOPE IN EITHER DIRECTION
3" R TYP
DETECTABLE WARNING SURFACE �
SEE STANDARD PLAN F-45.10
DEPRESSED CURB AND GUTTER -
SEE NOTE 4
CEMENT CONCRETE CURB
AND GUTTER � SEE NOTE 4
CURB RADIUS DETAIL O
CEMENT CONCRETE CURB RAMP "TYPE
MIT �
ISOMETRIC VIEW
TYPE PERPENDICULAR A PAY LIMIT
ISOMETRIC VIEW
TYPE PERPENDICULAR B PAY LIMIT
GRADE BREAK
I
i
�
2' - 0"
I MIN SEE CONTRACT PLANS -
2 0� MAX 4� - 0"
BUFFER WIDTH - MATCH TO
� ��� CURB RAMP DEPTH (TYP )
A
CURB RAMP WIDTH 4' - 0" MIN
� LANDING TO MATCH CURB RAMP
� � WIDTH � SEE CONTRACT PLANS
r�
u,, !
v,, �_.�
�i,.
� �„
� v � v
u, i
CEMENT CONCRETE
PEDESTRIAN CURB -
SEE NOTE 4
D I
DETECTABLE WARNING SURFACE �
� �� SEE STANDARD PLAN F-4610
� DEPRESSED CURB AND GUTTER
CROSSWALK
\
PLAN VIEW
TYPE PERPENDICULAR B
(SHOWN V1ATH BUFFER)
GRADE BREAK
COUNTER SLOPE -
5 0% MAX
� TOP OF ROADWAY
DEPRESSED CURB AND GUTTER -
SEE STANDARD PLAN F-10 12
4�TRjC� �
4.� Q ,u� W�syr �A ��a��
'� � `�,' � a � �
A� �� " - � '�� �����
w `C � � �
��
•o ^ � ���`�I
�O � 34363 O �► � � � � �
't'� �C(STBR�' G ti� �����
� �� �����
�a�`�
z
PERPENDICULAR
CURB RAMP
STANDARD PLAN F-40.15-02
SHEET 1 OF 1 SHEET
APPROVED FOR PUBLICATION
Pasco Bakotich lll 6/20/13
STATE DESIGN ENGINEER DAiE
� Wash�ngton State Depaelmenf of Transportata�
�//
�
,
MATCH SiDEWALK
' WIDTH � 4' 0" MIN
- SEE CONTRACT PLANS
3/8" EXPANSION JOINT
' (TYP ) � SEE STANDARD -
PLAN F-3010
SIDEWALK
- SEE NOTE 6
1 � --
' �
BUFFER STRIP - SEE �
, CONTRACT PLAN�
PEDESTRIAN CROSSING
, CLOSURE SIGN
J
J
W
0
��
�
�
w
�
, m
�
0
, GRADE BREAK -
SIDEWALK
� SEE NOTE
'
,
'
'
'
'
,
�
PEDESTRIAN CURB
- SEE NOTE 10
- 0" MIN
� � �
� o
N N �
,. � .�
GRADE BREAK
2 0% MAX 1
u � �° D
CURB 8 GUTTER
- SEE NOTE 5
CURB RAMP
FACE OF
�
�
CuRB pLAN VIEW
TYPE SINGLE DIRECTION A
a5'-0�'MAX
SEE NOTE 8
8 396 MqX
�
CURB RAMP
"CEMENT CONCRETE CURB RAMP
r.,..� ........ � .,���,.t�..., .�� �AY LIMIT
ISOMETRIC VIEW
TYPE SINGLE DIRECTION A
PAY LIMIT
PEDESTRIAN CURB
- SEE NOTE 10
MATCH SIDEWALK WIDTH � 4' 0" MIN
SEE CONTRACT PLANS �
LANDING �g�� �pqNSION JOINT - SEE
� 3" R STANDARD PLAN F�30 10
t�
– Z Q p —
�
o - ��
�
� SIDEWALK � �
� I v SEE NOTE 6
DETECTABLE WARNING SURFACE BUFFER �
SEE STANDARD PLAN F-45 70 STRIP
PEDESTRIAN CROSSING
CLOSURE SIGN
DETECTABLE WARNING SURFACE
- SEE STANDARD PLAN F-4510
GRADE BREAK
COUNTER SLOPE
5 0°Yo MAX
TOP OF
_ .� ROADWAY
LANDING � DEPRESSED CURB 8 GUTTER
- SEE STANDARD PLAN F-10 72
SECTION o
GRADE BREAK
51DEWALK �
SEE NOTE 6
MATCH SIDEWALK
WIDTH � 4' 0" MIN
SEE CONTRACT PLANS
NOTES
1 This plan is to be used where pedestnan crossing in one direction is not
BUFFER pe�i�d
STRIP
2 Curb ramp location shall be placed within the width of the assoGat�
crosswalk, or as shown in the Contract Plans
3 Where "GRADE BREAFC' is called out, the ent�re length of the grade break
PEDESTRIAN CURB between the iwo ad�acent surtace planes shall be flush
- SEE NOTE 10
4 Do not place grat�ngs, �unction boxes, access covers or other appurtan-
ences in front of the curb ramp or on any part of the curb ramp or landing
5 See the Contract Documents for the curb design specified
See Standard Plan F-10.12 for Curb, Curb and Gutter, Depressed Curb
� and Gutter and Pedestrian Curb detads
_��, 6 See Standard Plan F-3010 fnr Cement Concrete Sidewalk Detads
� See contract plans for width and placement of sidewalk
O
�
� 7 The bid item "Cement Concrete Curb Ramp Type"does not include the
ad�acent Curb or (Curb and Gutter), Depressed Curb and Gutter, Pedestrian
`�,.,� � pETECTABLE WARNING SURFACE Curb or Sidewalk, or the pedestrian crossing closure sign
��J SEE STANDARD PLAN F-4510
CURB 8� GUTTER 8 The curb ramp maximum running slope shall not require the ramp length to
- SEE NOTE 5 exceed 15 feet to avoid chasmg the slope mdefinitely when connecting
to steep grades When applying the 15 foot maximum length, the running
CURB RAMP slope of tfie curb ramp shall be as flat as feasible
15' - 0" MAX
SEE NOTE 8
GRADE
BREAK
8 34� AA�qX
V
1" RADIUS ..::\.?
CORNER .::::.�
•::::::::..
PEDESTRIAN CURB ��•••••••��
9�� ANG�E
RADIUS MAY
VARY
��-o
DETAIL OD
2 0% MAX
9 Curb ramps and landings shall reoeive broom finish
See Standard Specifications 8-14
10 Pedestrian Curb may be omitted if the ground surtace at the badc of the
Curb Ramp and/or landing wdl be at the same elevat�on as the Curb Ramp
or Landmg and there wdl be no matenal to retain
15 - 0" MAX
SEE NOTE 8
GRADE BREAK
LEGEND
- — SLOPE IN EITHER DIRECTION
B 3%MAX
� a
CURB RAMP � LANDING
SECTION OB
"CEMENT CONCRETE C
TYPE SINGLE DIRECTION B
� �
DETECTABLE WARNING
SURFACE - SEE
STANDARD PLAN F-4510
DEPRESSED CURB AND
GUTTER - SEE NOTE 5
CURB RAMP
SIDEWALK -
SEE NOTE 6
ISOMETRIC VIEW
TYPE SINGLE DIRECTION B
PAY LIMIT
4p�TRrc �m���
4 � � w,�sy�� ,� �����
8
�' `�°� ` � ��a��
a � �, � � ��� e
� ~c ��� �
�� `�
A ^ � ` ��q'aY
�O� �� 34363 �O � $����
��, c(ST�� G 1� �����
s ��NAL �� �����
€�a��S
SINGLE DIRECTION
cuRB �►MP
STANDARD PLAN F-40.16-02
SHEET 1 OF 1 SHEET
APPROVED FOR PUBLICATION
Pasco Bakotich lil 6/20/13
STATE DESIGN ENGINEER �A1E
� Woshmg�on Sfafe Daparfmant of Tronsporlatron
��/
L FACt �r
CURB
PLAN VIEW
TYPE SINGLE DIRECTION B
�
�
z
w
� �
w
m
J
J
m
, m
�
0
'
'
'
i
1
'
'
'
�
'
�
'
,
'
,
'
2x2 WOOD POST
FENCING
MATERIAL -�
I
� C �
0
�
HIGH DENSITY POLYETHYLENE OR
POLYPROPYLENE MESH, AND SHALL BE
UV RESISTANT, ORANGE COLOR
1' - 0" MIN
(DEEPER FOR
UNSTABLE SOIL)
STAPLE TOP TIE
SELF-LOCI4NG TIE - NYLON 6/6 (MIN GRADE),
r 50# MIN TENSILE STRENGTH, UV STABILIZED
FENCING
MATERIAL
� a
�
STEEL T-BAR POST
SELF-LOCKING TIE - NYLON 6/6 (MIN GRAD�,
50# MIN TENSILE STRENGTH, UV STABILIZED
6' - 0" MAX
� ENVIRONMENTALLY
2 � _ 0 �� � SENSITIVE AREA
(DESIRABLE) BOUNDARY
2x2 WOOD OR
STEEL T-BAR POST
TYPICAL SECTION
I
ELEVATION
t
NOTE
( 1 Post shall have sufficient strength and durabd�ty
� to support the fence through the life of the pro�ect
i
�
ELEVATION
FENCE ON SLOPE
i
HIGH VISIBILITY FENCE
STANDARD PLAN 1-10.10-01
SHEET 1 OF 1 SHEET
APPROVED FOR PUBLICATION
Pasco Bakotich lll 08-11-09
5TATE DESIGN ENGINEER DATE
�
� wasnm9ro� swfe oa�,anmem of rmr�sPommon
���
��; �;;
� �
'
0
�
0
'
U
�
J
� m
�
�
'�
�
'
'
�
�
,
1
'
1
'
i
'
�
'
�
SEDIW
SECTION VIEW
NOT TO SCALE
1SS
WTE DEVICE
�R
DRAINAGE GRATE
NOTES
1 Size the Below Inlet Grate Dev�ce (BIGD) for the storm water structure it
WIII S6MCe
2 The BIGD shall have a budt-in high-flow relief system (overflow bypass)
3 The retneval system must allow removal of the BIGD without spoling the
collected matenal
4 Perform mamtenance in accordance with Standard Specification 8-01 3(15)
STORM DRAIN
INLET PROTECTION
STANDARD PLAN 1-40.20-00
SHEET 1 OF 1 SHEET
APPROVED FOR PUBLICATION
Pasco Bakotich Ill 09-20-07
STA1E DESI�N ENOINEER ��
� W�hmgton Sfate Deparlmant of Trarroporlol�on
���
�
,
'
�
,
'
'
,
�
,
�
APPENDIX D
CONSTa2UCTION �ORMS
�
'
, ACCEPTANCE OF COMPENSATION & RELEASE OF ALL CLAIMS
' <Project Title>
<City Project Number> -<City Construction Contract Number>
' <CONTRACTOR>, hereby indicates agreement wrth, and acceptance of, the final Contract Payment of
<$000,000>, the total Contract Price of <$000,000,000>, mcluding Washington State sales andlor use
t�es, and the final Contract Time of <NNN Days>, as full and final compensation for all Work
' performed m connection wrth Contract Number <City Construction Contract Number>, and does
hereby release the Crty of Bremerton from all clauns, liabilrty, demands, damages and actions of any
lcind whatsoever, arismg from performance of that Contract
,
<CONT1tAC'I'OR>
, gy Date
' Title
'
Certificate of Notarv
, Subscribed and sworn to before me tlus day of
�
'
I�
�
,
�
'
�
'
� � � � - � � � � _ � � � � � � � � �
Revision 1 - 4/5/01
City of Bremerton
Engineering Division
Daily Force Account Report Contractor:
�
'
'
1
�
�
�
'
,
�
�
'
�
'
�
�
�
(
�
I
I
i' i
CITY OF BREMERTON
REQUEST FOR INFOi�MATION
Log No. (Unique, Chronological)
Project Title
Contractor:
Project No.:
Contract Date:
(For Contractor's Use)
Date Sub�ect
Information Description
Contractor's Authonzed Signature
I Date
Information Descript�on
Owner's Authorized Signature
(For Owner's Use)
Sub�ect
� � � � ■i■ � s � ■� � � r � � � ■� � �■■ ■�
CITY OF BREMERTON
Pro�ect
Contractor
Pro�ect No
SHOP DRAWING SUBMITTAL
Submittal No
Date
Resubmittal (Y/N)
Previous Submittal No --
To Be Com leted b the Contractor To Be Com leted b the Ci
Speafication No Make Amend
Item P/C Para / Dwg Copies Exceptions Corrections and Re�ected
No " Reference Descn tion of Item Sub'm Taken Noted Resubmit Resubmit
(") P- Partial Submittal, C- Complete Submittal
Contractor, mitial by either (a) or (b), to certify the following
(a) We have venfied that the matenal or equipment contamed in this submittal meets all reqwrements speGfied or shown
(no exceptions)
(b) We have venfied that the matenal or equipment contained m this submittal meets all reqwrements speafied or shown,
except for the folloHnng dewations (list deviations)
-
_
Contractors Authonzed Representative
Review Remarks
CorrecUons or comments made relative to submittals dunng this review do not relieve the contractor from Very tR�ly yOUB,
compliance with the reqwrements of the drav�nngs and speGficaUons This check is only for review of City Of Breme�tOn
general conformance with the design concept of the pro�ect and general compliance with the informaUon Dept of Public Works and Utd�t�es
given m the contrect documents The contrador is responsible for co�rming and correlat�ng all quanUUes
and dimensions, selectmg fabncation processes and techrnques of construdion, coordinaUng his work with
that of other Vades, and performmg his work m a safe and saUsfactory manner Pro�ect Engineer
�
,
'
CITY OF BREMERTON
WORK CHANGE DIRECTIVE (WCD)
WCD #: Date:
Project Name
Project #
Contractor:
Notice to Proceed Date:
� YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S)
�
�
'
I ATTACHME
'
,
�
'
'
'
�
,
�
'
'
If a claim is made that the above change(s) have affected Contract Pnce or Contract Times any claim for a Change Order
is based thereon wdl involve one or more of the following methods of determming the effect of the change(s) The
Change Order wdl be executed in accordance with Section 1-04 4 of the WSDOT Standarri Spec�ficat�ons, or Article 10 of
the General Conditions
Method of determirnng change m Contract Pnce
❑ Urnt Pnce
❑ Lump Sum
❑ Time & Materials
❑ Other
Method of determirnng change in Contract Times
❑ Contractor's Records
❑ Engineer's Records
❑ Other
Estimated increase (decrease) in Contract Price
$
If the change involves an mcrease, the estimated
amount is not to be exceeded without further
authorization
RECOMMENDED
CONTRACTOR
By
PAGE 1 OF 1
Estimated increase (decrease) in Contract Times
Substantial Completion 0 days,
Ready for final payment 0 days,
If the change involves an increase, the estimated times
are not to be exceeded without further authorization
AUTHORIZED
CITY OF BREMERTON
By
'
��
'
,
'
,
'
'
Cl
1
1
1
1
1
1
i
1
'
'
� CITY OF BREMERTON Date
�
, DAILY QUANTITY TABULATION FORM page
Pro ect Name Pro ect Number Ins ector
Contractor Descri tion of Work
B�d Description of Item B � d Unit Quantity
Item Quanti For toda
Inspector's and Contractor's signatures are reqwred Quantities Reported by
Refer to Section 1-09 1(1) for reporting reqwrements Inspector, C�ty of Bremerton
Reviewed and Acknowledged
Contractor
�
�
�
'
��
' APPENDIX E
GEOTECHNICAL REPORT FOR SHELDON BOULEVARD
�
,
�I
�
'
�
'
'
'
�J
,
�
lJ
'
�l
�
^`"'�, y ��i� � ��B a ������ I��O
.� � �F ��
�,; � � � q
�t*� �;_ �'a�Qt�`."h4tlt��� t.t`�(F r�ati'E;ic�id'tiM�6lt�L, C����t1P.TwN�';3
Al!#9rG1
�.at IF ORNIA
COLCF�OG
r LOI<ICA
�l4fSS61JRi
OREGON
SrtRSt hhG (ON
'
,
,
�
'
October 18, 2013
Crty of Bremerton
Engmeenng & Water Resources
3027 Olympus Drive
Bremerton, WA 98312
Attn Mr William Davis, P E
RE: SI�EI..DON BOUI.,EVARD PAVElV�EN'� DESIGN ItECO1VilVIENIDA'I'gONS,
, BREMERTON, WASHING'I'ON
'
'
'
'
We are pleased to submrt this letter with our pavement design recommendations for the above-
referenced pro�ect This letter presents the results of our subsurface explorahon and engineering
analyses to develop recommendation for the new pavement section Our services were provided
in accordance wrth the scope of services outlmed in our e-ma.il proposal dated September 30,
2013 Our services included conducting a field reconnaissance, soil sampling and testing, and
performing engineermg analyses to develop the recommendations provided in this letter During
our ficld reconnaissance, we observed the condrtion of the existing pavement, measured
aggregate tluckness and classified the subgrade soil
PAVEIVI[�N'T
' The existmg Sheldon Boulevard roadway consists of Portland cement concrete (PCC) pavement
During earlier mstallation of sarutary sewer lme, the PCC pavement was saw cut and the sarutary
sewer installation was completed, trenched section was patched with hot-�rux asphalt (HMA)
' pavement The existing PCC pavement is in poor condrtion The roadway is currently lightly
used mainly by the passenger vehicles and occasional trucks Numerous cracicing of the existing
' PCC pavement indicates that differential settlement of subgrade soils has occurred It is our
understanding that the existing PCC pavement will be completely removed and replaced with
new flexible HMA pavement We also understand that the existzng sarutary sewer pipe will be
,
'
'
'
replaced wrth a new pipe
4�0 NORTH 391"ri STREET, SUtT�: 100
f' O C30X 30Q303
SEAT"fL� WASMIPJGTON 9£f103
206-632-�0?0 FAX 2Q6-695-6777
Td� 1-800-833-6388
ww�,v shannt�n�vi[son cam
21-1-21280-002
�l
Crty of Bremerton
Attn Mr William Davis, P E
October 18, 2013
Page 2 of 5
u ,, �F � �
Pavex�aent Coreng ancl Subsurface Comditio�ns
On October 9, 2013, we visrted the site to evaluate the subsurface condrtion below the existing
PCC pavement The condrtion and thickness of the existing PCC pavement and subgrade soils
were assessed usmg testing methods consisting of cormg the pavement and evaluating the
exposed subgrade soils Pnor to oux site visrt, Ciiy of Bremerton personnel cored the PCC
pavement at six locations The locations of the core holes are indicated in the Site and
Exploration Plan, Figure 1 A hand-auger was used to sample subgrade soils and to evaluate
subgrade consistency Samples were obta.ined using Porter sampling equipment using a
40-pound weight fallmg 18 mches to drive 1 2-inch outside-diameter splrt-spoon sampler The
number of blows for the last 12 inches of penetration was used to evaluate relative densrty of
subgrade soils The Porter penetration resistance in blows per 6 inches correlates approximately
to the Standard Penetration Resistance in blows per foot at values up to about 25 Table 1
prescnts the summary of observed pavement and subgrade soil condrtions
'PABLE 1
S�)MNIARY OF EXISTING PAVENgENT CONI�ITION AND SUBGRAfl�E SOILS
� Pavement Subsurface Cond�t�on
Type
Borm ! in La er i in La er 2 m
B-1 From 0 to 8 From 8 to 26 Loose, brown and �'ay From 26 to 44 Very loose, brown
PCC sand with avel SP , mo�st, (fill) sand with avel SP , moist, (fill)
From 0 to From 7 5 to 26 Loose, brown and gray From 26 to 56 Very soft, reddish and
B-2 7 5 PCC sand wrth gravel (SP), motst, (fill) brown, silty sand (NII,), wet,
numerous or anics
From 0 to 7 From 7 to 29 Medium dense, brown
B-3 HMA and gray sand wrth gravel (SP), moist,
(fill)
From 0 to 7 From 7 to 15 Medium dense, brown From 15 to 22 Medmm dense, gray
B-4 pCC and gay sand with silt and gavel (SW), gravel wrth sand (GW), moist, strong
moist, (fill) sewer odor, (fill)
From 0 to 7 From 7 to 27 Loose, brown and gray From 27 to 63 Very soft, gray and
B-5 pCC sand with gavel (SP), moist, (fill) brown, silty sand (ML), wet, some
or amcs
B-6 From 0 to 8 From 8 to 17 Dense, brown gravel with
PCC sand (GW), moist, crushed rock, (fill)
Notes
Depth of pavement and subgrade soils was measured with respect to the fimsh grade
1 Bonng B-3 �s located in hot-m�x asphalt (HMA) patch Soils cons�st of san�tary sewer trench bac�ll
2 Bormg B-4 encountered lateral samtary sewer pipe at depth of 22 u►ches
m= mch, PCC = Portland cement concrete
21-1-21280-002-L1 dacx/wpNcn
�
�
�
�
�
�
�
�
�
��
�
�
�
L _�
�
21-1-21280-002 '
�
�
�
City of Bremerton
Attn Mr Will�am Davis, P E
October 18, 2013
Page 3 of 5
;_ � � � ;�. ; � �� ,
r.
'
�
Pavement Section Design
, The pavement sections were evaluated using the American Association of State Highway and
Transportation Officials (AASHTO) method for flexible pavement design (AASHTO, 1993) and
conform to Waslungton State Department of Transportation (WSDOT) requu�ements This
' design method is an empirical design based on actual performance tests that considers the
strength of materials and traffic stresses in each layer of the pavement cross sec�on as well as the
' strength of the subgrade below the pavement
The Sheldon Boulevard subgrade soil cons�st of approximately 1 5- to 2-foot-thick, loose to
' medium dense granular fill placed over very soft to soft c,ohesive soils with orgarucs Our visual
classification tests indicate that soft soil has greater than 50 percent fines content In accordance
' wrth the WSllOT Pavement Design Guide (WSDOT, 2412), we recommend assuming a"poor"
subgrade condition (based on fines content and relative density of subgrade soils) Accord�ngly,
we used a Resilient Modulus (MR) of 3,000 pounds per square inch for pavement design
'
�
��
�
'
'
,
�I
���
We estimated vehtcle usage based on discussions v�nth the City of Bremerton and predicted
activities at the site The CiTy of Bremerton did not provide specific traffic counts for this
pavement design We understand that the street will serve mainly a low volume of passage
vehicles and two garbage collection trucks on a weekly basis We estimate approximately 150
passage cars w111 use the street on a daily basis (approximately one car every 5 minutes during
dayhght time) For HMA pavement, we assumed a 20-year design life wrth no growth
Equivalent single �le loads (ESALs) were estimated based on load equivalency factors
developed by AASHTO (1993) Input data used for our analyses are presented m Table 2
' 21-1-21280-002-L1 doc�c/wpNrn
21-1-212g�-��2
�
'
�
Crty of Bremerton
Attn Mr William Davis, P E
October 18, 2013
Page 4 of 5
0.J0 �Y�V �u `�`Ld #1 lvY�16sA../�d `�4 y6 Td9u6u ,
'
TABI.E 2
INPUT g9ATA F0�2 HOT-NdIX ASPHALT (HNYA) PAVElVIENT ANAL�SES
Parameter
Design hfe [years]
Design traffic load [ESALs]
Reliability, R [%]
Overall standard deviation, S
OPSI
Subgrade resilient modulus, M [ksi]
Asphalt layer coefficient, ai
Base course layer coefficient, a
Base course dramage coefficient, m2
Base course resihent modulus, Base M [ksi]
Levee Crest and Access Ram
20
2,260
85
OS
15
30
0 44
0 13
10
28
Notes
ESALs = equivalent s�ngle axle loads
ksi = ktps per square mch
M = resilicnt modulus
Paveenent Section Recommendatioms
Based on observed "poor" condrtion of subgrade soils and traffic mformation provided by the
Crty, we recommend an HMA pavement section consisting of 3 inches of HMA, overlymg
4 inches of crushed surfacmg base course Priar to placmg the base course, we recommend that
an 8-inch layer of compacted granular material be placed over a geognd to help stabilize the
loose/soft subgrade The fill should be compacted to a mimmum 95 percent of the modified
proctor maximum dry density per ASTM International (ASTM) D 1557 (ASTM, 2007) On-stte
sand with gravel may be reused as backf'ill over the geogrid provided rt is not overly moist or
contaminated wrth unsuita.ble materials
We recommend that a TXS tnaYial geogrid or equivalent be used to reinforce the fill placed over
the soft subgrade The geogrid is manufactured from a stress-resistant polypropylene sheet that
is punctured to form ribs onented m triaxial directions Please refer to Tensa.r Internattonal
Corporation (2013) for TXS product specifications and mstallation procedures
Aggregate base course, and HMA should be constructed m accordance wrth WSDOT and
American Public Works Association (APWA), Standard Spec�fications for Road, Bridge, and
Municipal Construction (WSDOT/APWA, 2010) HMA should conform to Section 5-04 m the
WSDOT Standard Specifications
zi-t-z►zso-oo2-Li aoc��nx�,
21-1-Ziaso-ooa '
p
'
'
,
'
,
'
'
'
'
r
t
,
'
'
'
�
'
r
'
Gity of �3xemertan
Attn: Mx W�il�am Uav�s, P�
(�ctnb�r 1 �, 2� 13
Pa�e 5 of 5
������`'9k�������� �'�`���..��+�G��� ���W�,
A��regate for HMA sht�u[d meet Sectian 9-t�3 8 requirements for Hl�� sub�ccted to less than
� matll�csn �SA�,s. HM.A shQUld consist caf I1.MAi Class YZ-Yn;ch aggre�ate m accordatxce with
Sectian 9-03 8(2) B�se course should meet tl�e requtrennents of WSDC)T-55 S�ction 9-03.9(3)
for �rushed surfa�ang base course The base caurse should b�e cdmpac.-ted co at least �S perc�nt caf
maxrznum dry d�nsity
Th� basc course shc�uld be proof rolled with a lt��ded dump truck {pr equivalcnt} to �heck for
yield�ng conditians Any yieldang areas should be suitably repl�ced Sc��, loc�se, wet, ar
otherwise yi�tdYng mater�al s�aould be remc�ved and �eplaced
We recc�mtnend that Sliann�n & W�Ison be retaxned ta observe the subgrade excavatian and
geo�rid installa�nn.
Sineerely,
SHANNON & WILSON, INC.
Nt��� Ra���
Geot�chnicalStaFf
�
M.XR M W Plrnxr
Enc• R�fcre�ces
Fi�ur� 1� S1t� and Fxplprat�on P1�n
21-1-212S4-pA2-f.t dasxhv�tikn
4 w
,�,� ��� `�
M�rtin W. P��e, P.� , L.E G
S�ntc�r Ass���at�
Geatechnical Cn�ine�r, �.E�l� �A,P. L?�3IA
z i-�-� ��so�aa�
� ��"�d � � a�
��..�;;�� " .�.
_; a :
�FEI�NC�S
American Association of State Highway and Transportation Officials (AASHTO), 1993,
AASHTO guide for design of pavement structures, 1993 Washington, D C AASHTO,
2v
ASTM International (ASTM), 2007, Annual book of standards, construction, v 4 08, soil and
rock (I) D 420 — D 5611 West Conshohocken, Pa
Tensar International Corporation, 2013 Available http //www tensarcorp com/
Waslungton State Department of Transportation and American Public Works Association
(WSDOT/APWA), 2010, Standard specifications for road, bridge, and mumcipal
construction (M41-10) Olympia, Wash , Washington State Department of Transportation
and Amencan Public Works Association
Washington State Deparlment of Transportation (WSDOT), 2012, Pavement guide interactive
Avatlable http //training ce washington edu/WSDOT/
21-1-21280-002-Ll-Ref docx/wp/Ikn
21-1-21280-002 '
�
� � �■ � � � � � � � � ■� �■ � � � � � �■