Loading...
HomeMy WebLinkAbout3208 RESOLUTION NO. 3208 A RESOLUTION of the City Council of the City of Bremerton, Washington, ratifying amendments to the Kitsap Countywide Planning Policies WHEREAS, the Countywide Planning Policies (CPPs) are written policy statements used solely for establishing a countywide framework from which County and City comprehensive plans are developed and adopted to ensure that their comprehensive plans are consistent, and WHEREAS, the Kitsap Regional Coordinating Council (KRCC) originally adopted CPPs in 1992 to coordinate countywide planning among local jurisdictions, and WHEREAS, it is necessary and appropriate to update and revise CPPs periodically to assist the coordination of local planning to keep current with changing conditions and expectations, and WHEREAS, the KRCC concluded the 2013 CPP update process with a set of recommended amendments to the Kitsap County Board of Commissioners on September 24, 2013, and WHEREAS, the 2013 CPP amendments can be generally summarized as follows, they clarify the process for siting of essential public facilities to be consistent with the Washington Administrative Code (WAC) and establish the countywide population distribution through the year 2035, and WHEREAS, the Kitsap County Board of County Commissioners is expected to adopt the revised CPPs as recommended by the KRCC with the passage of an ordinance on November 25, 2013, and WHEREAS, under the amendment procedures incorporated in the CPPs, revisions to the CPPs adopted by the Board of County Commissioners do not take effect until ratified by cities and Tribes within Kitsap County, and WHEREAS, the City of Bremerton considers the CPPs as recommended by the KRCC Board on September 24, 2013, to be of benefit to the planning, development and growth interests of the City and County, NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS SECTION 1. The City of Bremerton approves and ratifies the updated Kitsap Countywide Planning Policies, attached hereto as Exhibit A, as recommended by the KRCC, conditioned upon and subject to adoption by the Kitsap County Board of Commissioners 1 Countywide Planning Policies Ratification 2013 SECTION 2. SeverabihU If anyone or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect SECTION 3. Effective Date This Resolution shall take effect and be in force immediately upon its passage /�AI� PASSED by the City Council of the City of Bremerton, Washington this oW day of f ber , 2013 GREG EELER, Council President APPROVED AS TO FORM ATTES q R ER A L OVICH, City t - S NNO C RIN, City Clerk R \Legal\Legal\Resolutions \Community Development \Countywide Planning Policies Ratification 2013 doc 2 Countywide Planning Policies Ratification 2013 CPP RATIFICATION RESOLUTION EXHIBIT A Adopted Kitsap Countywide Planning Policies AWvember M, 2041 Date ofAdontion Attached are the Kitsap Countywide Planning Policies as adopted by the Kitsap County Board of Commissioners by ordinance on Nevei er- 14, 2 011 Date o Adoption (Ordinance ^'�T as adopted) The Countywide Planning Policies as revised are currently in effect in Kitsap County The Kitsap Countywide Planning Policies are the framework for growth man in Kitsap County Under the Growth Management Act, the Puget Sound R defined as King, Kitsap, Snohomish and Pierce Counties The Puget So Re Council is responsible for developing the four - county regional transport do d and use vision The Kitsap Countywide Planning Policies tailor the Puge d R g>onal Council's regional growth management guidelines to Kitsap C the policy framework for the County's and the Cities' Compreh ive The Kitsap Countywide Planning Policies address 14 separate eleme n om urban growth areas to affordable housing The Countywide Planning Policies are required by Gr wth Management Act and may be appealed (only) by Cities and th overn f Washington The original Kitsap Countywide Planning Pol cies ( ted by Kitsap County in 1992) and subsequent revisions (August 2001, em 2003, November 2004, November 2007, November 2011, a e r 2013 were developed through a multi- lunsdictional collaboraho e by the Kitsap Regional Coordinating Council among Kitsap County, t e rt s of Bremerton, Bainbridge Island, Port Orchard & Poulsbo, the S ish ort Gamble S'Klallam Tribes, the Navy, the Port of Bremerton, and p sit Kitsap County is 1 d nc or its environmental review P changes, approved by the KRCC Executive Board for Kitsap County adoption & QV & Tribal ratification, appear in red underlined italics Proposed policy changes pages 22 & 45146 Adopted by Kitsap County Ordinance "'eras adopted 1 Date of Adoption rr..,.,,. w... 1 P 2 CPP RATIFICATION RESOLUTION EXHIBIT A CONTENTS Page INTRODUCTION 3 POLICY ELEMENTS A Countywide Growth Pattern (CW) 5 B Urban Growth Areas (UGA) 7 C Centers of Growth (C) 13 D Rural Land Uses and Development Patterns (R) 15 E Countywide Strategies for Open Space Preservation, R ce o ection, Critical Areas, Air Quality, and Water Quality /Quan P ) 17 F Contiguous, Compatible, and Orderly Develop nt ) 20 G Siting Public Capital Facilities (CF) 22 H Transportation (T) 24 I Housing (H) 30 J Countywide Economic Develo in t ) 33 K An Analysis of the Fisc t ( 35 L Coordination with b 1 ents (CT) 36 M Coordination a overnment including Navy (CF) 37 N Roles & spo es (RR) 39 APPENDIX A atifi io Process a o ion Distribution b C an Growth Area Management Agreements c Revenue Sharing Interlocal Agreement (adopted December, 2001) d E Current Organizational Interlocal Agreement e F Regional and Kitsap- Designated Centers List f G Centers & Limited Areas of More Intensive Rural Development (LAMIRD) Matrix g Adopted by Kitsap County Ordinance 76 '-eras adopted 2 Date of Adoption rr yen b it 14 CPP RATIFICATION RESOLUTION EXHIBIT A INTRODUCTION The Growth Management Act (GMA) is founded on the principle that it is in the best interest of the citizens of the State to foster coordination and cooperation among units of local and state government Cities and counties must engage in a collaborative planning process under the requirements of the Act Specifically the Act states that, "THE LEGISLATURE FINDS THAT UNCOORDINATED AND UNPLANNED GROWTH POSE A THREAT TO THE ENVIRONMENT, SUSTAINABLE ECONOMIC DEVELOPMENT, AND THE HEALTH, SAFETY, AND HIGH QUALITY OF LIFE ENJOYED BY RESIDENTS OF THE STATE IT IS IN THE P IC INTEREST THAT CITIZENS, COMMUNITIES, LOCAL GOVERNMENTS, AND THE PRIVATE SECTOR COO D COORDINATE WITH ONE ANOTHER IN COMPREHENSIVE LAND USE PLANNING " To guide the e p of Comprehensive Plans and development regulations, the GMA sets forth planning g 36 70A 020) in 13 areas 1 Urban Growth 8 Natural Resource Industries 2 Reduce Sprawl 9 Open Space and Recre 3 Transportation 10 Environment 4 Housing 11 Citizen Part icipat d dination 5 Economic Development 12 Public Facihtie rvices 6 Property Rights 13 Historic Pre ati 7 Permits The Growth Management Act (RCW36 70A 210) s to t ` A COUNTYWIDE PLANNING POLICY ISA WRITTEN POLICY STATEMENT OR STATEMENTS USED SO FO TABLISHING A COUNTYWIDE FRAMEWORK FROM WHICH COUNTYAND CITY COMPREHENSIVE VELOPED AND ADOPTED (TO) ENSURE THAT CITYAND COUNTY COMPREHENSIVEPLA ISTENT " required m RCW 36 70A 100 "NOTHING IN THIS DOCUMENT SHALL BE CONS R D O ALTER THE LAND USE POWERS OF CITIES " The Act requires that the countywide poli colla ra ively developed among Cities and the County Further, "FEDERAL AGENCIES AND N T ES MAY PARTICIPATE INAND COOPERATE WITH THE COUNTYWIDE PLANNING POLICY O 10 CESS " These policies may also be used for other purposes requiring collabor n c eration in addition to the development and adoption of comprehensive plans Vision 2040 (adopted y th Sound Regional Council during 2010) serves as the long -range growth managem iro ental, economic development, and transportation strategy for King, Kitsap, Pierce, ho is Counties Vision 2040 includes the Regional Growth Strategy, Multi -Coon olicies (RCW 36 70A 210) and Implementation Actions The 19 C tywide Planning Policies and subsequent revisions in 2001, 2003, 2007, 2011 ere developed by a committee of planners representing Kitsap County, the City of B o e City of Port Orchard, the City of Poulsbo, the City of Bainbridge Island, the Port G e S' allam Tribe, the Suquamish Tribe, the Navy, and Kitsap Transit' At each point, the Kitsap egional Coordinating Council conducted a public hearing and prepared a recommendation for adoption by the Kitsap County Board of Commissioners and ratification by Cities and Tribes The process of review and discussion through the Kitsap Regional Coordinating Council forum is intended to foster consensus whenever possible County and City Comprehensive Plans must be consistent with the adopted Countywide Planning Policies ' The Kitsap County Health District and Kitsap Economic Development Alliance (KEDA) also reviewed and commented upon the 2011 amendment proposals 3 Adopted by Kitsap County Ordinance a'�Tas adopted Date option " e bei I :, CPP RATIFICATION RESOLUTION EXHIBIT A Policies for Update and Ratification (UR) 1 The Kitsap Countywide Planning Policies should be dynamic and regularly monitored for applicability and effectiveness a The adopted Countywide Planning Policies should be reviewed through the Kitsap Regional Coordinating Council process at least every five years Proposed revisions shall be reviewed for impacts according to the State Environmental Protection Act (SEPA) and shall be consistent with the State Growth Management Act (GMA) b The County or a City may propose a policy amendment to the Countywide PI s 2 Proposed amendments should be considered on a regular basis and voting is sub sap Regional Coordinating Council by -laws a Kitsap County shall take action to consider and adopt amendments or sions 1 the Countywide Planning Policies following recommendation from the Ki onal Coordinating Council b The Kitsap Regional Coordinating Council will strive for i t all Cities and Tribes during the 90 days following the Board of County Co s ers' doption of its subject ordinance The adopted CPP will become effective on r ion by three or more cities in Kitsap County c A City or Tribal Council that does not ratify he re d Countywide Planning Policies within 90 days of the Board of County Commission ' ad ion of its subject ordinance shall provide a written statement of its objec n - tsap Regional Coordinating Council, in order to facilitate further review (S A for process flow chart) d Once the ratified revisions to th Count a Planning Policies take effect, a City or the Governor's office may appe the visi to the Growth Management Hearings Board within a further 60 day p 4 Adopted by Kitsap County Ordinance a'�ras adopted Date of Adoption " 1 4 ; 2011 CPP RATIFICATION RESOLUTION EXHIBIT A Element A. Countywide Growth Pattern The vision for the future of Kitsap County, "seeks to maintain and enhance the quality of life that makes our County a special place to live and work envision a future in which our natural systems are protected, the water quality in our lakes, streams and Puget Sound is enhanced, the village character of some of our smaller towns is preserved, the historical nature of our communities is respected in order to preserve our heritage for future generations, a diversified economic base that supports good fobs, contributes to healthy downtowns in our Cities and affordable housing choices, the rural appearance of our county is perpetuated This vision of the future, shared by citizens and elected officials, includes the following elements a Livable urban communities and neighborhoods, centers for employment, civic activities, housing • Attractive, well designed, bike /pedestnan- friendly and livable urban communities, enhanced by preserved historic properties and neighborhoods, that are supported by efficient and high quality services and facilities, and provide a range of housing choices • Healthy cities that are the region's centers for employment, affordable housing choices, and civic and cultural activities b Vital diversified economy An economy that provides training, education, and living wage fobs for residents, supported by adequate buildable land for a range of employment uses and that encourages accomplishment of local economic development goals as articulated in the Kitsap Economic Development Alliance's adopted plan, Kitsap 20/20 A Strategy for Sustainable Economic Prosperity c Efficient multi -modal transportation system Creation of an efficient, clean, and sustainable multi - modal transportation system — including roads and highways, public transportation, ferries, airports, and opportunities for non - motorized travel — that provides efficient access and mobility for county residents, and supports our land use pattern d Natural systems protection • Protection and enhancement of the natural environment, including wetlands, streams, wildlife habitat, shorelines, water quality, air, climate, and natural resource lands • Creation of a system of open space, trails, parks, and greenbelts that provide opportunities for recreation and that give structure and separation to urban areas e Rural character Maintenance of the traditional character, appearance, economic and ecological functions, and lifestyles of Kitsap County's rural communities and areas to include the production and distribution of locally grown food f Responsive Government An efficient and responsive government that works in partnership with citizens, governmental entities and Tribes to meet collective needs fairly, and that supports education, environmental protection and human services A key strategy to accomplish this vision is the intention to encourage future urban growth in areas within incorporated cities and in unincorporated areas that are already characterized by urban growth with existing and planned services and facilities These actions will work to strengthen our natural environment and rural character, and are geared to reduce taxpayer costs by focusing the expenditure of public funds, encouraging concentrated development where appropriate, and increasing our choices for housing and fobs " 5 Date of Adoption l m ,,, 4 2011 CPP RATIFICATION RESOLUTION EXHIBIT A Balancing historical patterns of growth with a preferred vision of the future and legal requirements is an on -going challenge Tradeoffs must be made to balance the costs with the gains, flexibility is necessary to adapt to changing conditions These policies are intended to reflect the long -term goals of the people living, working and doing business here Policies for Countywide Growth Pattern (CV) 1. Roles of Cities and Urban Growth Areas/Urban Communities a The primary role of Kitsap's urban communities is to encourage growth, through development, re- development and in -fill (See Appendix B for current and pro c population distribution ) Population growth should be directed to Cities, urb eas and centers with a transportation system that connects people with fobs o n b Each of Kitsap's urban communities should foster its unique vision as a i ua ity place to live and work, through urban design, historic preservation, and t im ove the natural and human-made environments, promote healthy lifesty c to to a prosperous economy, and, increase the region's resiliency i t c or adverse events c In Kitsap, urban communities are closely linked to wa a Rghanges menities and provide open space links to the natural environment 2. Roles of Kitsap County: a Keep regional vision in mind when makm cal de isions b Promote stewardship of unincorporate u s and promote annexation into cities or incorporation. NJ c Maintain/enhance natural syste s and 1 character d Include a variety of low d ru 1 communities, densities, and uses 3. To achieve these goals egional Coordinating Council member jurisdictions should: a Make decisio t er hen needed b Coordmat oop rate on land use policy, capital planning, environmental issues, and cultural resource ge nt/plannmg c Esta lash , d eep updated a Buildable Land Analysis Program d AMel rogram for the Transfer of Development Rights to preserve lands with 4 t public benefits Ma ntam/preserve distinct urban identities with green breaks or other natural features f romote tiering and /or phasing of infrastructure development within Urban Growth Areas g Develop and implement land use policies, regulations and incentives to promote the efficient use of urban areas h Incorporate provisions addressing community health into appropriate regional, countywide, and local planning and decision - making processes Adopted by Kitsap County Ordinance �'�ias adopted 6 Date of Adoption e+ " b r 1" 2011 CPP RATIFICATION RESOLUTION EXHIBIT A Element B. Urban Growth Areas The basic premise for designating Urban Growth Areas is to encourage the location of urban density residential, commercial and industrial developments in areas where services can be most economically provided The benefits of directing growth to designated urban areas include • Higher density residential development within walking or bicycling distance ofjobs, transit, schools and parks • Limiting urban expansion into rural and forested areas • Promotion of in -fill or redevelopment of existing urban areas • Preservation of open space, critical areas and lands designated for resource protects • Accommodation of employment growth to a concentrated pattern " 5, **" • More economical provision and maintenance of streets, sewer /water lines and eclh=i acilities • Promotion of attractive residential neighborhoods and commercial districts w e a sense of community • A harmonious relationslup with regional planning as articulated by V t Transportation 2040, adopted by the Puget Sound Regional Coun th ' tnd transportation strategy for central Puget Sound Background The Growth Management Act Policies for Urban Growth Areas (UGA) was amended in 1997 requiring Kitsap County and Cities to monitor countywide 1. Land Utilization & Monitoring Programs development activities in five -year intervals Consistent with RCW 36 70A 115, the County an in order to test their Comprehensive Plans' Cities shall ensure that, taken collectively, ado on of growth and land absorption assumptions Two different analyses are used (1) The and amendments to their comprehensive p r Land Capacity Analysis, first conducted by development regulations provide suffic t it of Kitsap County in 2002, estimates the land suitable for development within t eir existing land supply based on a set of jurisdictions to accommodate the usin d defined assumptions, e g market factor, employment growth (derived p lation speed of land absorption, critical areas distribution), as adopted in ap ca e Countywide exclusions, etc It uses a consistent, agreed - Planning Policies and co the 20 -year upon methodology, with allowance for population forecast fro e ffice of Financial documented variations for individual Management and idance (Implements Jurisdiction's conditions (2) The Buildable Multi- County PI ing o y DP- Action -15) Land Analysis (as required by the State GMA) uses recorded percmt activity to track a The Co rttes shall maintain a Land and monitor residential, commercial, and Capa sis Program using consistent, industrial growth It will be updated agre -up ethodology to estimate the land throughout Kitsap County in 2007 It is an able to accommodate future adaptive management tool for comparing al, commercial, and industrial growth development assumptions, targets, and objectives with actual development If Th ounty and the Cities shall participate in an inconsistencies are found, the County and eed -upon Buildable Lands Analysis Program to Cities must then implement reasonable monitor and evaluate the effectiveness of their measures, other than adjusting Urban respective Comprehensive Plans Growth Areas, that will be taken in order to comply with the GMA The following c The County and Cities shall establish procedures countywide planning policies relate to this for resolving disputes in collection and analysis of regional program to monitor the buildable Land Capacity data In the event a resolution land supply for future growth as forecasted cannot be achieved, the Kitsap Regional by the State and distributed through the Coordinating Council shall be a forum to review I Kitsap Regional Coordinating Council Adopted by Kitsap County Ordinance ;6 -2W4as adopted Date ofAdoption X% 14 2011 CPP RATIFICATION RESOLUTION EXHIBIT A and if possible facilitate any disputes between parties 2. Each jurisdiction is responsible for implementing appropriate reasonable measures within its jurisdictional boundaries. If the Buildable Lands Analysis shows that a jurisdiction's Comprehensive Plan growth goals are not being met, that jurisdiction shall consider implementing additional reasonable measures in order to use its designated urban land more efficiently. 3. Process and criteria for establishing, expanding, and adjusting Urban Growth Ar as in Kitsap County: a Urban Growth Areas are areas "within which urban growth shall be encoura d d u ide of which growth can occur only if it is not urban in nature" (RCW 36 70 ) e cept under specific circumstances, as fully contained communities and mas t a esorts as authorized by the Growth Management Act b Unincorporated Urban Growth Areas shall be associated with is future city c All Urban Growth Areas shall be reflected in County and r ive i y comprehensive plans d Sufficient area must be included in the Urban Gro Ar s ccommodate the adopted 20 -year population distribution as adopted by the Ki R onal Coordinating Council and consistent with WA Office of Financial eme projections e A jurisdiction may define growth tiers wit its Ur an Growth Area (RCW 36 70A 110 3) to focus public and /or private roves WMW growth is desired Utility development and /or expansion may be phased p efficient and cost - effective growth and to prioritize investments f The County, City, or interes zens ay initiate an amendment to an existing Urban Growth Area through the o re h save plan amendment process as authorized by the Growth Management t g Any junsdichon s 1 t and its Urban Growth Area shall achieve densities and urban growth p o stent with the Growth Management Act and the City's adopted Comprehensi Pla any inter -local agreement between the City and the County h If an ad r osed, 20 -year projected population distribution requires the expansion of its n rowth Area, the respective jurisdiction shall conduct planning and analysis, addr sin ollowmg conditions p and confirm the capacity analysis for land within the existing Urban Growth for residential, commercial, and /or industrial lands, which takes into account all evelopment approved within the overall UGA since the last UGA expansion This shall be based upon updated Buildable Land and Land Capacity Analyses that follow the guidelines of RCW 36 70A 215 or other analysis determined appropriate for the particular UGA involved To maximize consistency across jurisdictions, each jurisdiction shall use consistent methodology in calculating capacity ii Review the planning and zoning regulations and any incentive programs in place to determine expected densities and urban growth patterns in the existing UGA consistent with the Growth Management Act and the jurisdiction's adopted Comprehensive Plan 8 Adopted by Kitsap County Ordinance �'�ras adopted Date ofAdoption r q m r a 2011 CPP RATIFICATION RESOLUTION EXHIBIT A iii Determine whether the adoption and implementation of suitable reasonable measures should be considered, if the Buildable Land Analysis shows that its Comprehensive Plan growth goals are not being met iv Data collection and analysis for the Land Capacity Analysis should be done cooperatively The County will be responsible for data describing growth and capacity in the unincorporated portion of the Urban Growth Area, and the City for the incorporated portion i Expansion of Urban Growth Areas shall direct growth first to areas alre*abe by urban growth that have adequate existing public facility and service e development, second to areas already characterized by urban growth tha adequately by a combination of both existing public facilities and servic additional needed public facilities and services that are provided, and th e adjacent to incorporated cities or established Urban Growth Areas o meeting the first or second priority has been designated Areas ch v xistmg public facilities or where public facilities can be reasonably extend and t currently at urban densities should be considered first within this cate J A jurisdiction, as part of its Comprehensive Plan ame a or Subarea Plan process, that proposes an expansion of the UGA shall prepare o dat mpanson of potential areas for expansion, including 1 Planning and zoning regulations cu a tl lace ii An evaluation of how a full ran f u - evel infrastructure and services would be provided within potential s eas, including appropriate capital facility analysis Fire S rm Water Solid Waste Police Potable Water Park & Recreation Facilities Transp ati Sewer Schools Utilp1b§ we nd Telecommunications, including Broadband Em edical Services All eedt ers including special districts and adjacent jurisdictions should be in evaluation Best available infrastructure technology may be used r t has been approv ed by the jurisdiction as part of a broader review of a ology i ough specific standards and criteria are not implied, other factors shall be ddressed in evaluating areas for Urban Growth Area expansion, including but not limited to environmental constraints, economic development, preservation of cultural, historical, and designated resource lands k The City and County shall conduct early and continuous public involvement when establishing, expanding, or adjusting Urban Growth Areas, and shall do so jointly when appropriate Residents of unincorporated areas should be consulted and actively involved in the process affecting them Adopted by Kitsap County Ordinance "'was adopted 9 Date OfAdoptlon ri,. b,,. 14 " CPP RATIFICATION RESOLUTION EXHIBIT A 4. Coordinated Growth Management in Urban Growth Areas: a Adopted City and County comprehensive plans shall reflect the intent that all land within unincorporated Urban Growth Areas will either annex to a city or incorporate within the 20 -year planning horizon b To maximize the efficient use of urban lands, subdivisions in Urban Growth Areas shall be consistent with the associated jurisdiction's Comprehensive Plan and underlying zoning densities c As described in the Growth Management Act, cities are the primary provider o al services and facilities in their Urban Growth Areas, responsible for demons in w their Comprehensive Plans the capacity to provide all urban services wit h as crated Urban Growth Area(s) This may be accomplished through a collaborat oce with Kitsap County and/or other service providers d The County and Cities shall establish procedures to facilitatfttho sfer of governance for associated Urban Growth Area(s) through th Urban Growth Area Management Agreements (UGAMAs), as per Appe Growth Area Management Agreements e For Urban Growth Areas i The County should plan with associated Aes an al communities to address land uses, infrastructure needs, level of service swards as identified in these policies, and other issues as needed The resul s oul a reflected in the County Comprehensive Plan ii The County should provide a 1 v o an facilities and services consistent with the County's ability and appr eaten to provide such services for those Urban Growth Areas that will be ass late rth a specific city or that will eventually incorporate 5. Distribution of 20 year p u ti crements, as forecasted by the WA Office of Financial Manageme rk a The Kitsap Reg= ating Council shall coordinate the process for distributing the forecaste he period 2005 — 2025 and every five years thereafter, consistent with the r of the Growth Management Act Kitsap County shall adopt any revision tion distribution as part of its next Comprehensive Plan amendment proc Ga shall base their Comprehensive Plan amendments upon that dis ibution process should consider countywide demographic analysis, L� Analysis, and the OFM projections and it shall promote a countywide ent pattern targeting over three quarters (76 %) of new population growth to the des ated Urban Growth Areas The County and the Cities recognize that the success of is development pattern requires not only the rigorous support of Kitsap County in the rural areas, but also Cities' Comprehensive Plans being designed to attract substantial new population growth Population distribution will be reviewed through the Kitsap Regional Coordinating Council process every five years The review will include an analysis of the Cities' and County's progress in achieving target distributions If the 76% UGA target mentioned above for new population growth and the overall population targets are met or exceeded, the target for new population will revert to five sixths (83 %), as per the revised County -wide Planning Adopted by Kamp County Ordinance 7w as adopted 10 Date of Adoption "r.. a .. 14 CPP RATIFICATION RESOLUTION EXHIBIT A Policies adopted by Kitsap County Ordinance #258 -01 on August 20, 2001 Otherwise, the target may be reaffirmed or explicitly modified > Each jurisdiction with a designated Urban Growth Area shall develop an estimate and/or range of the additional population that it could accommodate and service during the 20 year planning horizon, consistent with its vision for future community character The estimate shall consider the need for increasing population density within the Urban Growth Areas to promote efficient service delivery, avoid sprawl, and preserve community character 11 The population estimates and /or ranges shall be provided to the Kitsap Regional Coordinating Council, with a statement of need concerning adjusted Urban Gr boundaries iii The Kitsap Regional Coordinating Council shall compile the junsdictto opu n estimates, including the estimate of additional population capacity for area tide the Urban Growth Areas, and determine whether adjustments to the ove stn ution are required in order to fit within the OFM projected range IV The Kitsap Regional Coordinating Council, after conductin ubli h anng, shall recommend the estimate and /or ranges of 20 year popul n is tion to Kitsap County for adoption as an amendment to the Countywide Pl g licies V Kitsap County should give substantial weight to th tsap gional Coordinating Council's recommendation in adopting the 20- ar po on distribution vi Following adoption of the estimates or ang ch jurisdiction should update its comprehensive plan, so as to arrive at a na pu ion target consistent with the estimate and/or within the original range Vii After each jurisdiction has comple d s rehensive plan update, the final adopted target should be compiled and eviewe ough the Kitsap Regional Coordinating Council process and the revised po att tst ution incorporated into the Countywide Planning Policies A final distribu Ur n Growth Areas versus non -Urban Growth Areas within the range specs ould then be calculated 6. Policies for Growth Urban Growth h Under the Growth Management Act (RCW 36 70A 350), Contained wt nits , ational fully contained communities (FCCs) may be considered, provided that a portion of the twenty -year population Historic To s n ster forecast is reserved for & subsequently distributed to the Planned FCC The GMA requires that FCCs provide for a mix of a a Pi review process and uses that would provide jobs, housing, & public facilities c ion terra for fully contained and services to support a long -term residential population o u ihes, national historic The GMA (RCW 36 70A 360) also allows the consideration ow , and master planned resorts of proposed master planned resorts (MPR's) outside of uld be incorporated in the Urban Growth Areas for shorter -term residential uses County's Comprehensive Plan, Master planned resorts are described as self - contained, fully must reflect the standards and integrated planned developments in areas with sigmficant requirements in the GMA, and in natural amenities addition must address the The GMA allows for areas with a federal landmark following designation to be developed as National Historic Towns 1 Provision of necessary public (RCW 36 70A 520) The designation may allow urban services in rural areas dependent upon historic development facilities, including but not pattern Its boundaries and land uses must be consistent with those over the course of its history, but not specific to any I 1 point in time Vision 2040 policies state that new FCC's are to be avoided CPP RATIFICATION RESOLUTION EXHIBIT A limited to parks, schools, and public safety facilities should be provided within or along with the development, consistent with adopted capital facility and level of service standards, ii Future assessment of adverse impacts to public infrastructure, nearby communities, adjacent rural areas, environmental resources, and designated resource lands Such impacts should first be avoided, second minimized, and third mitigated, ill Provisions for review of such developments through the Kitsap Regional Coor tang Council process, in addition to other procedural requirements b Consistent with guidance provided in Vision 2040, the Kitsap Regional Co Council shall avoid the establishment of a Fully Contained Community ) Pf it is found necessary to accommodate future urban population growth ma the Ki egional Coordinating Council recommend the creation of an FCC and a corre in new community reserve population Any such designation shaje o' st t with all Countywide Planning Policies establishing new Urban Grea men B3 and BS) and RCW 36 70A 350 (2), which, in part, requires that a rty reserve population be established no more than once every five years as a signation or review of Urban Growth Areas and that the Urban Growth Ar s sccordingly offset In addition, the following shall be included in Coun omprehensive Plan requirements governing FCCs i a phasing plan that monitors and re s c rrent development of commercial and employment uses with residents e m lit, to insure that the community is fully contained, ii a mechanism to insure that a timi f the development components will be fully regulated by the phasm lan, in a substantial public e c As Vision 2040 req pr hensive review and consideration of the regional impacts of any proposed Full Community, the County shall forward the proposal to adjacent count s, Sound Regional Council, and the Kitsap Regional Coordinating Council for w at a earliest possible point in the process The Kitsap Regional Coordina o shall review the proposal for regional impacts to the following i t e re n growth strategy as included in Vision 2040, F F t h in population growth between the countywide urban and rural areas, . elements of the Countywide Planning Policies 12 Adopted by Kitsap County Ordinance a'�Tas adopted Date ofAdoption , CPP RATIFICATION RESOLUTION EXHIBIT A Element C: Centers of Growth Centers are intended to be compact and centralized working, shopping and /or activity areas linked to other Centers by transit and non - motonzed facilities [See H Transportation 5 -6] Centers and their boundaries are intended to be locally determined by the County and the Cities where a community -wide focal point can be provided, significant population and/or employment growth can be located, and the increased use of transit, walking and bicycling can be supported Designated Centers are intended to define the pattern of future residential and commercial /industrial growth and incorporate opportunities for parks, civic, and p eni a development in Kitsap County (See Appendix F for listing of Kitsap Designate ) Policies for Centers of Growth (C): 1. In decisions relating to population growth and resource allocation supporting The Puget Sound Regional Council has defined growth, Centers have a high priority. several types of Centers within Urban Growth Areas in the four - county planning region, with 2. The Kitsap Countywide Planning Policies planning guidelines (Vision 2040) encourage the development of Centers according to the following typology: \\ J a Regional Growth Centers 1 Metropolitan Centers function as c in the region for a high density mix of business, residential, public, c ecreational uses, and day and night activity They are characterized by their is role as the central business districts of the mayor cities within the central P oun egion, providing services for and easily accessible to a popula wel eyond their city limits Metro Centers may also serve national or internat a ro ' (Vision 2040) ii Urban Centers e e h the comprehensive planning to support a wide range of commercia g, d cultural choices All areas of the Urban Center are serviced by transit ou o he day and much of the area is within walking or bicycling dist if nt in -fill opportunities exist with the highest residential, commercial, and a yment densities expected (Vision 2040) b Re gi , al facturing/Industrial Centers are mayor, existing regional employment areas t , concentrated manufacturing and industrial land uses which cannot be easily higher densities with other incompatible uses To preserve and maximize land at th centers for manufacturing, industry and related uses, large retail uses or non - related offices are discouraged Provision of adequate public facilities and services, including good access to the region's transportation system, is very important to the success of manufactunng/mdustrial centers " (Vision 2040) c The following are other types of centers within Kitsap County i Town or City Centers are usually the existing downtown core of a city or Urban Growth Area There is an abundant mix of shopping, service, employment, and cultural opportunities Multifamily housing may be intermixed and single family housing may Adopted by Kamp County Ordinance 9eras adopted 13 Date o Adoption Tr......n 1 4 2011 CPP RATIFICATION RESOLUTION EXHIBIT A be within walking or bicycling distance Infill should include mixed use and higher densities surrounding the Town Center ii Mixed Use Centers are a generic category that can be described in terms of neighborhoods or districts within a city or Urban Growth Area The designation represents a commitment to planning for Center development, with a planned mix of housing, commercial, service, and employment opportunities Most shopping and commercial uses are within a short walking or bicycling distance of housing There is a higher proportion of multi - family housing at relatively high densities Navy frikties could be considered for this designation in Activity and Employment Centers are areas of concentrated employm ar a magnet for significant numbers of people usually during daytime h eca of business and/or manufacturing activities They may be located utside o an Growth Areas, consistent with the Growth Management Act Ind d business parks and Navy employment centers are in this category Growth Areas, the opportunity to include a proportional residential ele sho d e determined on a case -by -case basis, considering the unique geograph n ec ics of the area iv Transportation Hubs are locations of regional i r- da nnection that may be located outside of Urban Growth Areas Exampl e rry terminals, the Bremerton National Airport, or certain transit station 3. Recognizing that communities evolve over t , a ju isdiction may request of the Kitsap Regional Coordinating Council an initi i 'on or a change in Center status. This request shall be considered and a d ' 'o a uring the next Countywide Planning Policies amendment cycle. A change a status may require action by the Puget Sound Regional Council. 4. In addition to meeting the pp bl criteria above, a request for Center designation or a change in Center status 91k, ess the following: (See Appendix G) a Current or pro tr nsportation Living wage is the minimum hourly wage resources (1 clu ds, ferries, needed by a sole provider working full transit, a , bi cle, pedestrian) time (2080 hours per year) to cover the b Balan a ving wage employment costs of food, shelter, clothing, and other op o t rth residential basic necessities for their family The c r mit and connectivity among fobs, assumption is that living wages vary across usi , retail services communities, based on differences in the es and density of residential uses cost of living and size of household [Sources Economic Policy Institute & KEDA] Inclusion of affordable housing Living Wage: Living Wage Calculator for f Provision of community gathering Kitsap County, Pennsylvania State University space, parks, and cultural opportunities http / /www li vingwage geog psu edu/ g Impacts to ecological functions Minimum Wage: WA State Dept of Labor & Industries http / /www lm wa gov/ Adopted by Kitsap County Ordinance "'�Tas adopted 14 Date ofAdoptlon N,.,,,,H.t er 4 20 CPP RATIFICATION RESOLUTION EXHIBIT A Element D: Rural Land Uses and Development Patterns Rural areas of Kitsap County are characterized as having a variety of parcel sizes, with a diversity of land use activities These areas also contain significant amounts of complex natural systems It is a high priority to preserve and enhance the rural character of these areas Counties are responsible for designating and regulating rural areas through the comprehensive planning process However, rural preservation is a regional issue and it is important to coordinate these pl g objectives with the Cities Policies for Rural Land Uses and Development Patterns (R): 1. Preserving rural character and enhancing the natural environment. a Preserve the character of identified rural areas by protecting and enh a natural environment, open spaces, recreational opportunities, and sce c h one areas Support small scale farming and working resource land, pr to lly grown food, forestry, eco- and heritage- tounsm Support low- densit i nt >ving and cluster development that provides for a mix of housing type , a eels of service, cultural activities, and employment that services the needs ral s at a size and scale that is compatible with long -tern character, products , an f these lands b This policy is not intended to preclude the ture a gnahon of Urban Growth Areas 2. Preserving rural land use and develop n t s: a Rural Communities are already -e is g dential and commercial areas of more intensive rural development d ated the Kitsap County Comprehensive Plan under RCW 36 70A 070 5 In -fil ex p ted Rural Communities should be serviced by transportation providers^ r rvices consistent with the Levels of Service adopted by Kitsap County for ro tsap Transit for transit upon their designation as an area of more intensive ra de ment b Transportati y be located within existing areas of more intensive developm alki , bicycling, and transit are the mayor forms of travel Transportation Hubs ar o regional intermodal connection Examples are ferry terminals and trans o with convenience services c nt shall develop criteria consistent with the Growth Management Act for a-ting future industrial and commercial development outside of Urban Growth Areas th otect rural character while encouraging vehicle trip reduction The cntena should all for industrial resource -based land use and recreation and for convenience commercial at is scaled to serve the daily needs of rural residents 3. Establishing and maintaining rural levels of service: a Rural level -of- service standards shall address sewage disposal, water, transportation and other appropriate services The standards shall be developed based upon levels of service typically delivered in rural areas consistent with RCW 36 70A 030 (16) Adopted by Kitsap County Ordinance "'�ias adopted 15 Date o Adoption rr ..,,..,.b r 14 2011 CPP RATIFICATION RESOLUTION EXHIBIT A b For purpose of trip reduction, develop a range of alternative modes of transportation consistent with rural levels of service to connect Rural Communities with urban Centers c When sewers need to be extended to solve isolated health, environmental, and sanitation problems, they shall be designed for limited access so as not to increase the development potential of the surrounding rural area 4. Conserving small -scale natural resource use in rural areas: a Rural land use designations in the County's Comprehensive Plan shall recognize ec o cal functions and support rural uses such as farming, forestry, mining, recreation, activities, and permit a variety of low- density residential uses which preserve ar er and ecological functions, and can be sustained by rural service levels b The County's Comprehensive Plan policies shall promote clustering r ential elopment and other techniques to protect and enhance significant open spaces, na ources, cultural critical resources, and critical areas for more effective use of the land s ould not increase residential housing units in the overall area designated as rur sist t with designated rural densities Development clusters shall be designed, s d d d in a manner consistent with rural character and the provision of rura e f service c The County's Comprehensive Plan policies shall suppo I Communities as locations of employment, a mix of housing types, and cultwftctivities for rural areas that primarily function as locations for service needs such gro stores, shopping, and community services, and small -scale cottage nndus or e ' Mounding rural area 16 Adopted by Kitsap County Ordinance 9eras adopted Date ofAdoption 2 0i 1 CPP RATIFICATION RESOLUTION EXHIBIT A Element E. Countywide Strategies for Open Space Preservation, Resource Preservation, Critical Areas, Air Quality, and Water Quality /Quantity Open space is defined as land area consisting of natural systems, resource lands and critical areas that include building limitations for future development These critical areas include wetlands, wildlife conservation areas, steep slopes, frequently flooded areas and areas with a critical recharging affect These open space lands also include aesthetic functions such as view sheds of the water or ndgelmes Many of these natural systems are inter- connected and cross multi - jurisdictional boundaries within the County The strategy is to conserve these areas and c ect them to create a regional open space network to protect critical areas, conserve natura e , and preserve lands and resources of countywide and local significance The purpos f t s strategies is to enhance the quality of countywide water, soil, and air resources ti ly, climate Policies for Open Space Preservation Resource Protection Critical AreliMr. and Water Ouality/Ouantity (PPCAAW) 1 Creating a regional network of open space: a The County and the Cities shall implement the Kits C t pen Space Plan and the Kitsap County Consolidated Greenway Plan which i h a countywide green space strategy that incorporates planning efforts oft ount , ities, state agencies, non -profit interest groups and land trusts in the Count ' 1�) b The County and the Cities shall prese d nce, through inter jurisdictional planning, significant networks and es pen space, regional parks and public/ private recreation areas, wildlife h it s, ical areas and resource lands, historic and cultural landscapes, water bodwaand t c The County and the Citi fr e and separate urban areas by creating and preserving a permanent network r rural open space, including parks, recreation areas, critical areas and r c 2. Conserving and c' a County's natural resources, critical areas, water quali ty /quanti , nd a A onmental amenities while planning for and accommodating sustainable o a The ou the Cities shall protect critical areas (wetlands, aquifer recharge areas, fish d dlif habitat conservation areas, frequently flooded areas, steep slopes, and e o y hazardous areas) and should consider other environmental amenities such as mdors, canopy cover, and ndgelmes b e County and the Cities shall establish and implement Best Management Practices to protect the long -term integrity of the natural environment, adjacent land use, and the productivity of resource lands c The County and the Cities shall establish procedures to preserve significant historic, visual and cultural resources including views, landmarks, archaeological sites, and areas of special locational character Adopted by Kitsap County Ordinance ;eras adopted 17 Date o£Adoption Tr,,,,, n t ,. 14 2011 CPP RATIFICATION RESOLUTION EXHIBIT A d The County and the Cities shall encourage the use of environmentally sensitive development practices to minimize the impacts of growth on the County's natural resource systems e The County and the Cities shall protect and enhance the public health and safety and the environment for all residents, regardless of social or economic status, by reducing pollutants, as defined by WA State and federal law f The County and the Cities shall work together to identify, protect, and restore ne - ks of natural habitat areas and functions that cross jurisdictional boundaries g The County and Cities shall protect and enhance ecosystems that support State's Priority Habitat and Species as identified by the Washington D en ish and Wildlife 3. Protection of air quality is accomplished by reducing the levels tox , e particles, and greenhouse gases released into the environment, especia th g transportation activities. a The County and Cities, in their respective comprehen p s, s ould include specific goals and policies to enhance air quality by reduce he r e e of toxins, fine particles, and greenhouse gases b The County and Cities should adopt and 1 lem urchasing policies /programs for vehicles /equipment that use clean effici t s 4. Protection of water quality and qua ' a omplished by reducing the amount of toxins and pathogens in our water s pp a The County and Cities shou a t po cies in their Comprehensive Plans to reflect that surface and storm water uif recharge areas should be treated as a resource b The County and Cit s ld ntmue to be models for low impact development and implement such pr enever practical c The County d Ci s ould develop and implement a program, as funding allows and where fe re ofit infrastructure that was developed prior to the implementation of best pract> in surface and storm water management programs 5. Listed s ecies a overy under the Endangered Species Act (ESA): a o my and the Cities shall preserve, protect, and where possible, restore the functions o ral habitat to support ESA - listed species, through the adoption of comprehensive pl policies, critical area ordinances, shoreline master programs and other development gulations that seek to protect, maintain or restore aquatic ecosystems associated habitats and aquifer through the use of management zones, development regulations, incentives for voluntary efforts of private landowners and developers, land use classifications or designations, habitat acquisition programs or habitat restoration projects b The County and the Cities shall provide incentive -based non - regulatory protection efforts such as acquisition of priority habitats through fee - simple and conservation easements from willing sellers Adopted by Kitsap County Ordinance 9w as adopted 18 Date ofAdop rr tion gven r 4 2011 CPP RATIFICATION RESOLUTION EXHIBIT A c The County and the Cities shall jointly establish and implement monitoring and evaluation program to determine the effectiveness of restoration, enhancement, and recovery strategies for salmon including ESA - listed species Each jurisdiction shall apply an adaptive management strategy to determine how well the objectives of listed species recovery and critical habitat preservation/restoration are being achieved 6. Coordination of watershed and land use planning: a The County and the Cities shall participate in a planning program that determine ch es in stream hydrology and water quality under different land use scenarios at u -o of designated land use classifications b The County and the Cities shall coordinate land use planning using wat s s or atural drainage basins to implement strategies for restoration of aquatic ha t and reduce impacts to other natural systems and participate in efforts to improve lth of our waterways. c Kitsap County shall coordinate and maintain a regional Pdin est available science for the purpose of modifying Critical Areas Ordinanc available d Upo n adoption of a state classification system, the s nty shall establish a single system for stream typing 19 Adopted by Kitsap County Ordinance 76-2 as adopted Date of Adoption a e b r , 20 11 CPP RATIFICATION RESOLUTION EXHIBIT A Element F. Contiguous, Compatible, and Orderly Development Upon designation of Urban Growth Areas, the County and Cities will need to develop consistent implementation measures to ensure that development occurs in an orderly and contiguous manner The intent of the following countywide planning policies is to minimize differences in urban development regulations and standards between the County and the Cities and to facilitate the economical provision of urban services to development Policies for Contiguous. Compatible. and Orderly Development (CCOM 1. Encouragement of cooperative inter- jurisdictional planning by federal, trio t , al, and special purpose government: a Inter jurisdictional discussion, information exchange, and coordination f os s shall be initiated as early and expeditiously as possible by the responsibl encies, aid in the smooth transition of governance b Initial inventories and analyses of utilities and public servic fo t n are critical to the planning process and shall be made available as early an e sly as possible by the responsible agencies c The Kitsap Regional Coordinating Council may esta h o esignate on -going technical committee(s) comprised of representatives fro tilrtie d service providers to investigate long -range regional needs for v nous litres and services, including but not limited to those for transportation, sewer an J torni 6 brainage, availability and delivery of potable water, solid waste, broadban d, ecreation, and open space d The Countywide Planning Policies i fu r the implementation of Vision 2040 and Transportation 2040 as adopt the et Sound Regional Council 2. Inter- regional coordinatio d e and transportation, environmental, and infrastructure planning: a The County and th 1 participate in the Puget Sound Regional Council and the Peninsula Re r ortation Planning Organization b Locally- d a shall be provided to the Puget Sound Regional Council and the Peninsu a ona Transportation Planning Organization for use in their coordination of pop ati asts, land use, and transportation c p g proposals of these regional organizations shall be monitored and adjustments nded to insure that they accurately reflect local needs and plans Re ognize and work with corridors that cross jurisdictional boundaries (including natural stems, and transportation and infrastructure systems) in community planning, development, and design 3. Fiscal equity: a It is recognized that fiscal disparities exist as a result of growth and changes in municipal boundaries The Kitsap Regional Coordinating Council shall monitor the Revenue Sharing Inter -local Agreement among the County and Cities (shown as Appendix D) and seek 20 Adopted by Kitsap County Ordinance al adopted Date ofAdoption A; "wniber 14 2011 CPP RATIFICATION RESOLUTION EXHIBIT A additional ways to address fiscal disparities as they relate to promoting coordinated development and the implementation of the Growth Management Act b The County and the Cities shall work together to insure that all fees associated with development approval are based upon the real cost of service and act to encourage development within designated Urban Growth Areas c The Kitsap Regional Coordinating Council shall facilitate on -going regional discussion on revenue equity issues 4. Community design and development: Strategies should promote orderly develoAhe reflects the unique character of a community and encourages healthy lifestyles building and site design and transportation connectivity In addition, sustai a ec y s and environmental development techniques should be utilized to enhance the qu lit f a Utilize design strategies to ensure that changes in the built environm ide continuous and orderly development b Encourage development that reflects unique local qualit des an economic benefit to the community c Design mixed use developments and local street pa tt s to mprove the environment for overall mobility and accessibility to and withi e dev ment through multi -modal transportation options that serve all users d Design of transportation networks sho t n the context of the built and natural environment, enhancing the comm o ectivity, and physical activity in the area community wide and specifically i d i d growth centers and high transit areas e Design schools, institutions lic acilrties to be compatible with the surrounding community character an e f Use sustainable but chn es (such as rehabilitation/re -use, LEED [Leadership in Energy & Enviro ign], Low Impact Development, energy - efficient fixtures, etc ) in the de d de lopment of the built environment g Support 1 , historic preservation, and arts to enhance quality of life h Pro md, tidal, wave generation, and other renewable energy generation where appr nat o serve the community 21 Adopted by Kitsap County Ordinance �"�ras adopted Date of Adoption At ye 1, r 14 -, 2n 1 i CPP RATIFICATION RESOLUTION EXHIBIT A Element G. Siting Public Capital Facilities The Growth Management Act requires local governments to inventory existing capital facilities owned by public entities, to identify locations and to determine capacities to meet future demand for growth without decreasing levels of service The Washington State Office of Financial Management is responsible for identifying and maintaining a list of essential state public facilities that are required or likely to be built within the next six years as required by the Growth Management Act Counties and cities are also required to coordinate the siting of countywide and statewide capital facilities to mitigate potential adverse impacts from the location and dey&pment of these facilities Policies for Siting Public Capital Facilities (CFI: 1. Identification of needed capital facilities: a The County and the Cities shall each inventory their existing capital and identify needed facility expansion and construction and provide that ditalftte tsap Regional Coordinating Council b The Kitsap Regional Coordinating Council shall deve mai tarn a list of public capital facilities needed to serve Kitsap County as hol b d upon the County and Cities' Comprehensive Plans, the Countywide Coordi ed ater System Plan, and other appropriate system plans These include, but of hmi ed to, solid and hazardous waste handling facilities and disposal sites, water d as water treatment facilities, regional water supply inter -tie facilities, educate ns ti s, airports, local correctional facilities, in- patient facilities including hospitals i al park and recreation facilities, and government buildings that serve s y as a whole, including those essential public facilities as defined in RCW 36 70A 2 2. Location of capital and pub ' cili s: a If the primary popul t , y the facility is urban, the facility should be located in a City or Urban Gro Ar ere feasible 3. Establishing a p ce eview criteria for the siting of facilities that are of a countywide o wi nature: a Whe 1 public facility as defined in RCW 36 70A 200 is proposed in Kitsap Co ' ty, a i location has not been evaluated through a regional siting process pursuant 36 - 196 -550 3 d the Kitsap Regional Coordinating Council shall appoint a nalysis and Site Evaluation Advisory Committee composed of citizen members se ed by the member jurisdictions to represent abroad range of interest groups to eva uate proposed public facility siting At a minimum this evaluation shall consider i The impacts created by existing facilities, ii The potential for reshaping the economy, the environment and community character, in The development of specific siting criteria for the proposed project, giving priority consideration to siting within Designated Centers, iv The identification, analysis and ranking of potential project sites, Adopted by Kitsap County Ordinance �'�ras adopted 22 Date ofAdoptton ", r 1" 2011 CPP RATIFICATION RESOLUTION EXHIBIT A v Measures to first minimize and second mitigate potential physical impacts including, but not limited to, those relating to land use, transportation, utilities, noise, odor and public safety, vi Measures to first minimize and second mitigate potential fiscal impacts b Certain public capital facilities such as schools and libraries that generate substantial travel demand should be located first in Designated Centers or, if not feasible to do so, along or near mayor transportation corridors and public transportation routes c Some public capital facilities, such as those for waste handling, may be more v r a ly located outside of Urban Growth Areas due to exceptional bulk or potentia e s or objectionable characteristics Public facilities located beyond Urban Gr h ould be self - contained or be served by urban governmental services in a m er t ill not promote sprawl Utility and service considerations must be incorpo into ite planning and development d Uses shall adhere to local health district or state agency rule- and g commercial and industrial use of on -site sewage systems e The multiple use of corridors for major utilities, tr an &ortation rights -of -way is encouraged A f County and City comprehensive plans and a el ent regulations shall not preclude the siting of essential public facilities g Public facilities shall not be locate i t d resource lands, critical areas, or other areas where the siting of such facil ie w be incompatible 4. Air transportation facilities ' C nty: a The Counties and the ie sh cognize the importance of airports as essential public facilities and the pr on access to the air transportation system b The County an ie all ensure the safety of the community and airport users through comp table se planning adjacent to airports and coordination of the airport with gro - s xamples would include not encouraging or supporting higher residentia , sities, schools, or hospitals near airports or airport approach corridors c The ount d the Cities shall plan for heliports throughout Kitsap County for emergency Adopted by Kam County Ordinance adopted 23 � Date of Adoption Al ° 4, 201 CPP RATIFICATION RESOLUTION EXHIBIT A Element H. Transportation The Growth Management Act requires that transportation planning be coordinated among local and state jurisdictions The Growth Management Act further requires that transportation planning be coordinated with the land use elements of local comprehensive plans Coordination of land use and transportation plans will allow Kitsap County and the Kitsap Cities to meet three inter- related transportation goals • Serve Designated Centers to reduce sprawl, conserve land and make more efficie use of infrastructure, • Preserve the natural environment, including water and air quality and, pot ate • Provide a balanced system for the efficient, clean, safe movement of p go s and services among Designated Centers within Kitsap County and the 1 er Pu Sound region The intent of the following policies is to define appropriate method s e ies to achieve these goals through inter - regional and antra- regional coordination am ation and land use planning agencies For the purpose of this Policy, the following transportation liti are of countywide significance a state and federal highways, b mayor arterials, c public transit facilities and servic d non - motorized facilities conn s ated centers, e marine transportation facilities (fe , shipping), f airports and heliports (p er or freight), g rail facilities (passen nd/ freight) The following facilities and onents should be included in the multi -modal network a roads, include a o ways, arterials and collectors, b public tr bus, rail, and park & ride lots, c non -mot ze c ies, d vehi ub c or private passenger only ferries, e ai o f ar lities that support the multi -modal network, ciliti s related to transportation demand management, in ent transportation systems (ITS) P ' i f rans ortation (T): 1. St egies to optimize and manage the safe use of transportation facilities and services: a The County and the Cities shall each emphasize the maintenance and preservation of their existing transportation network b Through the regular update of the Transportation Element of their Comprehensive Plan, the County and the Cities should each identify Level of Service (LOS) and prioritize operational and safety deficiencies, with the goal of substantially reducing deaths and serious injuries 24 Adopted by Kamp County Ordinance "'�Tas adopted Date ofAdoptaon Xqi, 14 2011 CPP RATIFICATION RESOLUTION EXHIBIT A c The County and the Cities should utilize Transportation System Management strategies such as parking restrictions, traffic signal coordination, transit queue dumps (traffic signal modification equipment that allows busses to move ahead of other vehicles), ramp metering, striping non - motorized transportation facilities, traffic calming devices, and real time sensor adjustments for traffic signals d The County and the Cities should develop and implement access management regulations that provide standards for driveway spacing and delineation, and encourage the jo use of access points where practical e The County and the Cities shall actively seek opportunities to share faciliti , and transportation resources, such as multiple use park & nde /parking lots o are c signal maintenance responsibility 2. Reducing the rate of growth in auto The State of Washington has taken steps to traffic, including the number of vehicle reduce greenhouse gas emissions and vehicle trips, the number of miles traveled, and miles traveled Not only does reducing the the length of vehicle trips taken, for both overall amount of travel produce benefits for commute and non - commute trips: improving air quality and curbing emissions related to climate change, it also lessens traffic a The County and the Cities shall provide congestion Developing a transportation system both infra- structure and policy that provides more opportunities for walking, incentives to increase the use of non- bicycling, or using transit also creates more SOV modes of travel choices and options for people i The range of infrastructure The WA State Dept of Transportation and incentives to encourage the use of Vision 2040 policies identify telework (or non -SOV modes of tray c tele- commuting) as a viable transportation include the followin alternative The WSDOT - funded 2008 Kitsap • Provide pub tr , it, , luding Telework Pilot Project noted the particular preferential a for transit, importance of telework in rural areas, where such a - ass lanes citizens tend to drive greater distances (dedic ed b 1 es that allow f tr ue dumps), traffic signal modifications, and safe, transit stops P 1 ntegrated transfer points to facilitate seamless trips between transit and oth modes of travel, particularly at ferry terminals, including park & ride lots, e storage facilities, carpool /vanpool and transit advantages to ease ingress/ egress, with proximity to actual connection points, and innovative transit- oriented development • Provide non - recreational bicycle and pedestrian facilities, including safe neighborhood walking and biking routes to school • During the development of all state, county, and city highway capacity improvement projects, consider the market for non -SOV travel and the addition of High Occupancy Vehicle (HOV) lanes, park & ride lots, and appropriate infrastructure for both bicycling and walking 25 Adopted by Kamp County Ordinance 7eras adopted Date of Adoption Xwentber 14; i CPP RATIFICATION RESOLUTION EXHIBIT A ii The range of policy incentives to encourage the use of non -SOV modes of travel could include the following • Increased emphasis on the Commute Trip Reduction Program already in place (including ndeshanng incentives), with Kitsap Transit designated as the lead agency, including program promotion and monitoring • Managed parking demand at ferry terminals, employment, and retail centers to discourage SOV use through privileged parking for HOV users, fee struc and parking space allocations • Encouraging telecommuting and home -based businesses as a viabl alternative • Encouraging the shift of work and non -work trips to off-peaftqayel h rs • Congestion pricing • Auto - restricted zones • Promotion of driver awareness through edu tion e , s d The County and the Cities shall develop stand@Ws for Vision 2040 and Transportation Complete Streets that address bicycle and ped s 2040 emphasize Complete Streets, facilities for development of new streets which ensure that transportation reconstruction of existing streets as ap at facilities serve all users and all ages consistent with State law and abilities By designing and operating Complete Streets, local e In Designated Centers, the jurisdiction uld complete jurisdictions provide pedestrians, missing vehicular and non- oto d 11 s between key artenals to accommodat tna , and bicycle bicyclists, motorists, and transit riders with safer travel and can facilities, without co i afety standards avoid expensive retrofits, f The County and th all develop bicycle and encourage physical activity and pedestrian pl s, c ould be coordinated across help create walkable communities junsdicho and es with particular consideration to There is no singular design providin r for children to walk and to bike to prescription for Complete Streets, each one is unique and responds to scho its community context g a r it shall review and comment on development sa s where appropriate, to facilitate convenient use and operation of appropriate tr services. 3. En ironmental impacts of transportation policies: a Transportation improvements shall be located and constructed so as to discourage /minimize adverse impacts on water quality and other environmental features b The County, the Cities, and Kitsap Transit shall consider programming capital improvements and transportation facilities that alleviate and mitigate impacts on air quality, greenhouse gas emissions and energy consumption, such as high- occupancy vehicle lanes, public transit, vanpool/ carpool facilities, electric and other low emission vehicles Adopted by Kitsap County Ordinance 9eras adopted 26 Date ofAdoptton X"wm'' ^'" 14 2011 CPP RATIFICATION RESOLUTION EXHIBIT A including buses, bicycle and pedestrian facilities that are designed for functional transportation c The County and the Cities shall ensure environmental protection, water quality, and conformance with ESA requirements through best management practices throughout the life of the transportation facilities, including i Facility design, and in particular low impact development strategies for the collection and treatment of storm water and surface run -off u Avoiding construction during the rainy season iii Regular and routine maintenance of systems d The County, the Cities, and Kitsap Transit should support Puget So d Cl it Agency public education about anti - pollution measures 4. Recognizing that the County and the Cities each encompass ng f evelopment and density patterns, each jurisdiction shall designate its Ce R.:he ' nt with the criteria set forth in Element C of the Countywide Planning Po ' Blowing policies relate to planning guidelines to support transit and pedes n ppropriate to each type of urban and rural development or re- development: a The County and the Cities shall each prep a !ev me nt strategies for their Designated Centers that encourage focused mixed use lop ent and mixed type housing to achieve densities and development patterns tha s ulti -modal transportation b In Urban Growth Areas, comprehe si p should promote pedestrian- and transit - oriented development that me es acc to alternative transportation and, in the interest of safety and convenience, clu fea res, such as lighting, pedestrian buffers, sidewalks, and access a nc e for physically challenged individuals c Rural Commumtie I co odate appropriate pedestnan/bicycle connections and transit service and s onsistent with rural levels of service in order to minimize vehicle trips 5. Transporta ' n between designated local and regional Centers: a Reg na rs shall be designated for automobile, freight, transit, HOV facilities, rail, bic c e, and pedestrian travel between centers as part of the countywide spo on plan T'h ansportation system linking Designated Centers within the county shall be transit - oriented and pedestrian and bicycle friendly 6. Freight transportation: i a Preferred routes for the movement of freight shall be identified as part of the countywide transportation plan b The County and the Cities shall work to ensure that compatible land uses are applied along designated freight corridors, including, but not limited to, corridors for air, rail, road and marine traffic Adopted by Kamp County Ordinance adopted 27 Date of Adoption Aleiw 14 2011 CPP RATIFICATION RESOLUTION EXHIBIT A c The County and the Cities shall use appropriate roadway standards for designated freight corridors 7. Transportation relationships with the Puget Sound Regional Council and the Peninsula Regional Transportation Planning Organization: a The Countywide Planning Policies should support adopted regional and state plans and policies. b The County and the Cities shall actively participate in the Puget Sound Regional o il and the Peninsula Regional Transportation Planning Organization (RTPO) to re a transportation planning in the two regions is consistent and accurately refl t 1 ds related to identified regional system components c The Kitsap Regional Coordinating Council shall serve as the point oordin on to assure Puget Sound Regional Council and Peninsula RTPO planning progr onsistent and mutually beneficial to jurisdictions within Kitsap County d The Transportation Improvement Program (TIP) for Kitsa 1 continue to be a part of the regional TIP adopted by the Puget Sound Region cil Local review, comment and recommendations shall be coordinated through K t onal Coordinating Council 8. Identification of needed transportation related ciliti vice e services within Kitsap County: a The Puget Sound Regional Council and a in a RTPO shall identify regional system components and related improvements i sap County with the concurrence of the Kitsap Regional Coordinating Cou b A countywide transportation deve d by the Kitsap Regional Coordinating Council shall be prepared pursuant the owt Management Act to identify countywide transportation facility e e eds A technical committee including transit and local, regional, and state tr 1 roviders shall be used in this process 9. Coordination of intra ansportation planning efforts: a The Puget So d R al Council reviews Cities' and the County's Comprehensive plans for consis la d use and transportation elements b The d the Cities shall address compatibility between land use and transportation facil ies b o ng new road improvements to justify land use intensification i anaging access on new transportation facilities outside Urban Growth Areas Allowing phased development of improvements including acquiring right of way iv Using comprehensive plans and development regulations to ensure that development does not create demands exceeding the capacity of the transportation system, such as density limits in areas outside of Urban Growth Areas, concurrency management and adequate public facility regulation, integrated multi -modal and non - motonzed networks Adopted by Kamp County Ordinance ;eras adopted 28 Date ofAdoptaon X.,•",.,., ber 1 4; 2011 CPP RATIFICATION RESOLUTION EXHIBIT A c The County and the Cities shall work together in a coordinated, iterative process to periodically reassess whether regional land use and transportation goals can realistically be met If transportation adequacy and concurrency cannot be met, the following actions should be considered i Adjust land use and/or level of service (LOS) standards and consider adopting multi - modal solutions ii Make full use of all feasible local option transportation revenues authorized bytapot yet implemented in Work with Washington State Department of Transportation (including State Ferries), Kitsap Transit, and the private sector to seek addition tate transportation revenues, state and federal grants for infrastructure im ro a ts, and local options to make system improvements necessary to acco to p ected population growth d Adjacent jurisdictions in Kitsap County shall develop con a stye t classification system and street standards e Kitsap Regional Coordinating Council may establi a pr a or evaluating development impacts including those that may affect neighboring J d tions within the county f The Kitsap Regional Coordinating Council h 11 tion to ensure that transportation planning, system management and improve is ocal, regional, and state levels are coordinated, complementary, and cons t wi adopted comprehensive land use plans 10. Coordinated and consistent level of ce S)standards a The County and the Cities s u eve l p comparable level of service standards among the County, Cities and the StAe Wa mgton for identified regional system components b The County and the ti s dopt roadway LOS standards Urban growth management agreements shall d e el of service standards c The County a d the i s shall adopt transit LOS in the form of "Service Standards" adopted b tsa Transit Board of Commissioners The standards shall consider both frequenc ervice and bus capacity d Con tent i State law, the County and Cities shall recognize the Level of Service r Highways of Statewide Significance, including principal arterial ferry routes, been adopted by the Washington State Department of Transportation, in their res tive Comprehensive Plans e or State highways and facilities of regional significance, including the Southworth ferry route, the County and the Cities shall include the Level of Service Standards adopted for these routes by the Puget Sound Regional Council, the Peninsula RTPO, and the Washington State Department of Transportation, in their respective Comprehensive Plans f On highways and streets which are subject to concurrency requirements, the County and the Cities shall each identify capacity deficiencies and either address them in terms of identified funding, adjust the LOS standard on a temporary basis, or place a temporary moratorium on development Adopted by Kitsap County Ordinance 4J440.4 as adopted 29 Date option r;..... ,, m . ► 2011 CPP RATIFICATION RESOLUTION EXHIBIT A g On highways and streets which are subject to concurrency requirements, new development should not cause LOS to degrade to a level lower than the adopted standard, consistent with State law. Adopted by Kitsap County Ordinance 'eras adopted 30 Date ofAdoption -ei "'b r 4 2011 CPP RATIFICATION RESOLUTION EXHIBIT A Element I. Housing The Growth Management Act requires cities and counties to encourage the availability of housing that is affordable for all income levels at a variety of housing densities Local jurisdictions are also encouraged to preserve existing housing resources in their communities, and to provide an adequate supply of housing with good access to employment centers to support fob creation and economic growth (WAC 365 196 410) VISION 2040 takes a comprehensive approach to Countywide Planning Policies addressing the range of housing needs Housing is Addressing Jobs - Housing Balance: addressed throughout the Countywide Planning Policies C 2/ Centers as areas of a mix of See box on right for specific references C 4 business, commercial and residential uses Jobs - Housing Balance: F 4 -c Mixed used development Jobs - housing balance refers to relationship of housing supply and the job base There are transportation J 1 -b Employment for diverse implications in terms of improving accessibility between segments of the community where jobs are located and where people live, as well as J 1 -e Economic Prosperity and access to goods, services and other amenities Policies in increased fob opportunities Element C Centers of Growth, Element F Contiguous, J 2 Promoting development of Compatible and Orderly Development, and Element J designed industrial and Countywide Economic Development are all part oft commercial areas County's overall approach to fobs- housing balanc J 3 Monitoring land supply Best Practices in Housing: The County and the Cities recognize the v h si g practices that preserve existing neighborhoods and communities, use land t e iently, make services more economical, and meet the diverse needs of our county' angi emographics The Community Design and Development Policies in Element Con ous, Compatible and Orderly Development address key innovative practices and de ci les for development and housing Affordable Housing: Housing affordability ref lance (or imbalance) between household income and housing costs Affordable ho ing or challenge in Kitsap County The following d n ate to the Countywide Planning Policies Housing shall mean housing intended for ge of household incomes These income levels are defined as follows (WAC 365 196 41 [2] - - ely low- income shall mean those households that have incomes that are at or 30% of the countywide median ■ ry low- income shall mean those households that have incomes that are within the range of 31 - 50% of the countywide median Low - income shall mean those households that have incomes that are within the range of 51 - 80% of the countywide median ■ Moderate - income shall mean those households that have incomes that are within the range 81 -95% of the countywide median ■ Middle - income shall mean those households that have incomes that are within the range of 96 -120% of the countywide median ■ Upper - income shall mean those households that have incomes above 120% of the countywide median Adopted by Kamp County Ordinance '"eras adopted 31 Date ofAdoption rT,. b, . 14; 2011 CPP RATIFICATION RESOLUTION EXHIBIT A Policies for Affordable Housing (Aft 1. Coordinated process among County, Cities, and housing agencies for determining and fulfilling housing needs, and the equitable distribution of affordable housing at all income levels in Kitsap County: a The County and the Cities should inventory the existing housing stock consistent with the Growth Management Act synchronized with County and Cities' respective Compr ensive Plan updates, and correlate with current population and economic conditions, pas tr ds, and ten year population and employment forecasts, to determine short and to housing needs, including rental and home ownership Navy personnel hou c should also be considered b Local housing inventories, projections, and equitable distribution s ies s Id be compiled, updated, and monitored under the coordination of the Kits onal Coordinating Council to identify countywide conditions and ode d eds c Sufficient land supply for housing including various ho all be identified and monitored through regular updates to the countywide 1 le L rids Analysis [see Element B -1 Land Utilization and Monitoring Pro s] d The County and the Cities should each identif ecific icies and implementation strategies in their Comprehensive Plans an sho nact implementing regulations to provide a mix of housing types and cos to le v dentified goals for housing at all income levels, including easy access t o ent centers e The County and the Cities shall me rp r e a regular review of public health, safety, and development regulations pert to sing implementation strategies to assure that i protection of the b e h and safety remains the primary purpose for housing standards ii regulations re tr ned and flexible to minimize additional costs to housing 2. Recognizing tha a place makes adequate provision for those in the upper economic bra eac jurisdiction should develop some combination of appropriately zoned land, a incentives, financial subsidies, and/or innovative planning techniq adequate provisions for the needs of middle and lower income persons 3. R ' in the percentage share of the existing and forecasted countywide population a ing stock, as well as the distribution of existing housing for those households ow 20% countywide median income, the County and the Cities should develop co inated strategies to disperse projected housing for those below 120% countywide median income throughout Kitsap County, where they are specifically found to be appropriate, in consideration of existing development patterns and densities These strategies should promote the development of such housing in a dispersed pattern so as not to concentrate or geographically isolate low- income housing in a specific area or community. Adopted by Kitsap County Ordinance "'�Tas adopted 32 Date ofAdoption "' eyembe" 14 2 CPP RATIFICATION RESOLUTION EXHIBIT A 4. Provision of affordable housing for households below 120% countywide median income should include: a Housing options located throughout Kitsap County in Urban Growth Areas and Rural Communities, as defined in Element D (2 -a),in a manner to provide easy access to transportation, employment, and other services > Designated Centers should include such housing options ii Rural self- help housing programs should be encouraged first in U al Communities and then allowed in other appropriate areas as deft th S Department of Agriculture b Local comprehensive plan policies and development regulate t co age and do not exclude such housing c Housing strategies that include i preservation, rehabilitation and redevelopm of e t g neighborhoods as appropriate, including programs to rehabilitate energy retro -fit substandard housing, ii provision for a range of housing t e ch multi - family, single family, accessory dwelling units, cooperative hou n , anufactured housing on individual lots and in manufactured housin ill housing design and s>tm comp e with surrounding neighborhoods, IV mechanisms to hel le I rchase their own housing, such as low interest loan programs, "self- p" h g, and consumer education V innovative r to s ategies that provide incentives for the development of such housin crag housing cost by subsidizing utility hook -up fees and rates, impact ees, unit processing fees, density incentives, smaller lot sizes, zero lot l n s, i clusionary zoning techniques, such as requiring housing for specified in lev s in new residential developments, transfers of development rights nonty permit review and approval process and/or other provisions as appr priate d policies and programs that address the provision of diverse housing opportunities to ommodate the homeless, the elderly, physically or mentally challenged, and other se ents of the population that have special needs e Participation with housing authorities to facilitate the production of such housing The County and the Cities shall also recognize and support other public and private not -for- profit housing agencies Supporting housing agencies is encouraged through public land donations, guarantees, suitable design standards, tax incentives, fee waivers, providing access to funding sources and support for funding applications, or other provisions as appropriate Adopted by Kitsap County Ordinance "'eras adopted 33 Date ofAdoptton 6 -^'^ o- 4 2011 CPP RATIFICATION RESOLUTION EXHIBIT A 5. The County and the Cities shall collaborate with PSRC to evaluate availability of appropriate housing types to serve future residents and changing demographics. 34 Adopted by Kitsap County Ordinance �'�ras adopted Date of Adoption T r,.,,,,.,,, B r 14 2n i 1 CPP RATIFICATION RESOLUTION EXHIBIT A Element J. Countywide Economic Development Growth Management Act requires that general economic development policies be identified in the Countywide Planning Policies Consistent with the goals of the Act, economic development planning must be coordinated with local comprehensive plans The intent of the following policies is to encourage coordinated economic growth among all jurisdictions in Kitsap County and to add predictability and certainty to the private investment decision Policies for Countywide Economic Development (Eft 1. A general strategy for enhancing economic development and employment: a The County and the Cities recognize that a healthy economy is important h eal of residents and quality of life in the county Economic development sho bal ced with environmental concerns and protect the quality of life b A healthy economy provides a spectrum of jobs including en V1,vi wag e, and advanced wage earner employment that, raises family mco vel vides opportunities for diverse segments of the community c The County and the Cities recognize that the econo y 1 County is very dependent on the U S Navy and diversification is necessary rsi a ion should be promoted through a multi- faceted strategy that includes adem a customer bases of existing contracting industries, expanding the numb r f 1 businesses that benefit from defense contracting, and building the base of busm cti that is not directly connected to the Department of Defense d The County and the Cities shall co ab ra ith ports, tribes, and other special districts to encourage economic growth divers ation that is consistent with comprehensive plans and policies for land use, pol ition, public transit, regional water supply, capital facilities, urban gove to ry es and environmental quality e Local government e u ged to utilize the Kitsap Economic Development Alliance (KEDA) as a res r ide advice on economic development needs, the potential for retaining and p istmg industries, including the U S Dept of Defense, and attracting dus es, especially those that would improve wage and salary levels, increase of job opportunities, and utilize the resident labor force f The oun the Cities should cooperate / participate with the Puget Sound Regional n onomic initiatives, including focus on identified industry clusters and clean and with the KEDA's adopted plan, Kitsap 20/20 A Strategy for Sustainable XOE mic Prosperity g e County and the Cities recognize that widespread access to broadband capability will enhance economic development in Kitsap County Local governments are encouraged to collaborate with the KEDA to promote the expansion of telecommunications in Kitsap County and to coordinate telecommunications policy with regional and federal agencies, including public utility districts, Bonneville Power Administration, regional transportation planning organizations, and neighboring counties Adopted by Kitsap County Ordinance Jeras adopted Tr....,, 35 Date o Adoption n t o 14 2011 CPP RATIFICATION RESOLUTION EXHIBIT A h Investments in our people, in particular, efforts of local educational institutions to provide, improve and expand vocational and post - secondary education programs, should be supported to assure a highly skilled, technically trained resident work force 2. The role of government agencies in assuring coordinated, consistent efforts to promote economic vitality and equity throughout Kitsap County: a The County and the Cities shall promote Urban Growth Areas and existing industrial sites as centers for employment b The County and the Cities shall encourage the full utilization/development o e C ignate industrial and commercial areas The County and the Cities shall promote 1 _11 i n within existing developed industrial and commercial areas to take adv of significant investments in existing buildings and infrastructure c The County and the Cities shall cooperate with tribes, ports, of a al istricts, and all economic development interests to identify the capital facile eed o pport economic development and should identify necessary funding sour d The County and the Cities shall collaborate with s, p s, d other special districts to identify innovative development methods such as pu private partnerships and community development assistance financing ncrease economic vitality e The County and the Cities shall collaborat th t DA and the Ports to establish a common method to monitor the sup si ted commercial and industrial sites and to ensure adequate land supply for th i of existing enterprises and the establishment of new economic enterprises The o t ng method shall indicate environmental constraints, infrastructure av ity capacity, and shall use the Kitsap County Geographic Information S Land Capacity Analysis as a regional database for this information f The County and th i ies establish common infrastructure policy and standards, including telec ca ns infrastructure g The Coun es a d KEDA shall collaborate to identify opportunities that favor local supplier oo d services 3. The Ki p i al Coordinating Council shall coordinate the development of land su it ing methods, common infrastructure policy and standards, and other s ong the County, the Cities, Tribes, Ports, and other special districts to u e economic development in Kitsap County: a e County and the Cities shall each establish and monitor a development review process that is timely, predictable, efficient, fair, and consistent b Where more than one jurisdiction is involved in planning and permitting a business development, the Jurisdictions shall work collaboratively to provide consistent development regulations and permitting c The County and the Cities shall encourage small business enterprises and cottage industries, and allow appropriate and traditional home occupations as permitted by local regulations 36 Adopted by Kitsap County Ordinance "'T 6eras adopted Date ofAdoptton -e n t r 14 2011 CPP RATIFICATION RESOLUTION EXHIBIT A Element K. An Analysis of the Fiscal Impact In order to preserve and maintain the community's quality of life and level of government services, jurisdictions are expected to fully evaluate their financial capacity to provide the full range of urban services (as described in Element B — 3[j]) within designated Urban Growth Areas Policies for Analysis of Fiscal Impact (FI): 1 The Countywide Planning Policies recognize three opportunities for jurisdictions to n der and plan for urban-level infrastructure and services a During each jurisdiction's comprehensive plan amendments, through the a 1 litres Plan, including sub -area plans, Urban Growth Area boundary changes, c ora ons, partial dis- incorporations, proposed new fully contained commumti d ma r planned resorts b At the point where a jurisdiction is comparing and analyzm P i areas for possible expansion of its Urban Growth Area (as described n Ele e c As part of the development of the Urban Growth a a greement (see Element B -4 [d] and Appendix C) These analyses and plans should identify infrastru d service costs as well as the anticipated revenues to support them 2 Special districts should be included in pl &1\Pulation a provision of urban level services in Urban Growth Areas and should inclu a growth in their plans 3 The Kitsap Regional Coordinate uncil all facilitate on -going regional discussion of infrastructure and service del S gees (see Element F -1 [c]) and revenue equity issues (see Element F -3 [c]) Adopted by Kitsap County Ordinance 9eras adopted 37 Date o�option n'"; -T4 2011 CPP RATIFICATION RESOLUTION EXHIBIT A Element L. Coordination with Tribal Governments The Suquarmsh Tribe, the Port Gamble S'Klallam Tribe, and other federally recognized Indian tribes have reservations and /or trust resources within Kitsap County, Washington These tribes are parties to treaties with the United States Government through which certain rights and privileges both on and off reservation were articulated and remain in effect These tribes have authorities, responsibilities, interests and treaty rights within their respective reservation boundaries and Usual and Accustomed Areas Since future growth and land use decisions in Kitsap County affrNil governmental entities, governmental agencies must be well informed and continuouslwrV in regional and local planning Policies for Coordination with Tribal Governments (CT): 1 Meaningful and substantial opportunities for early and continuous tribal rnm nt participation shall be incorporated into regional and local plannin g vrt 2 Local jurisdictions should work with the tribes to develop agr s t t provide for discussion on comprehensive planning issues among gove n nsure that the tribes are consulted on issues within their interest The parties will poi 1 termine the appropriate contents of the agreements and a schedule for complet the 3 Tribal governments, federal agencies, and county local governments are encouraged to coordinate plans among and between governments gencies to address substantive areas of mutual interest especially where geographi ar overlay and promote complementary and cooperative efforts 4 City and County governments are enco ra a to include Tribal governments in point comprehensive planning and de v ent ivrties for areas within the Tribes' Usual and Accustomed areas Activitie ude ut are not limited to the establishment and revision of urban growth boundaries, t u f forecasted population, regional transportation, capital facility, housing and uti s, d policies that may affect natural and /or cultural resources 5 All County, City, ernment agencies shall be included in the normal public notice and comment pro edur o ther agencies and kept informed of matters of interest to them 6 The County, iti , nd Tribal governmental agencies are encouraged to keep one another informe t ters of local and regional interest by mutually agreeable means and schedul Adopted by Kitsap County Ordinance "'�Tas adopted 38 Date of Adoption Tr,. r 1 4 ; 201 CPP RATIFICATION RESOLUTION EXHIBIT A Element M. Coordination with Federal Government including Navy The federal government has unique authorities, responsibilities, interests affecting land use and other activities Military installations are of particular importance to the economic health of Washington State, as well as to national security Since the impacts of future growth and development in Kitsap County affect all governmental entities, governmental agencies must be well informed and continuously involved in regional and local planning Policies for Coordination with Federal Government (CF): 1 Meaningful and substantial opportunities for early and continuous federal gove participation shall be incorporated into regional and local planning activities 2 It is recognized that constitutional and statutory provisions may constrain f 1 government agencies from entering into local agreements and processes Howe when possible, the County, the Cities, and federal governments should establi intergovernmental cooperative agreements promoting coordmatio in Iv ment in activities that are of mutual interest 3 Federal agencies and county and local governments are enc d t oordinate plans among and between governments and agencies to make a onsistent and compatible as possible for properties over which they a au o ty or activities they authorize and the adjacent areas affected 4 Federal government agencies are encouraged t art to in City, County, and point comprehensive planning and development tivi s t may affect them, including the establishment and revision of urban growt ar a ompassmg, adjacent to or within federally -owned lands, distribution of opulation, regional transportation, capital facility, housing and utility plans, olicies that may affect natural and/or cultural resources of interest 5 The following policies relat p o ng coordination among the Cities, County, and the federal government incl i y a All jurisdictions sh 1 , o ote planning that considers the impact of new growth to avoid the pote is r oachment on military readiness activities as described below whe d - elop , g zoning ordinances or designating land uses affecting military face It e a action and the Navy should coordinate to identify the types of deve d areas of interest to the Navy, method of notice, and opportunities for co , ent b lit eadmess activities" mean all of the following Training, support, and operations that prepare the men and women of the military and Naval ships and submarines for combat ii Operation, maintenance, and security of any military installation ill Testing of military equipment, vehicles, weapons, and sensors for proper operation or suitability for combat use c "Impacts" include but are not limited to 1 Aircraft, boat, and rail traffic ii Incompatible adjacent land uses Adopted by Kitsap County Ordinance "'� -'4as adopted 39 Date of Adoption r' r 14; 011 CPP RATIFICATION RESOLUTION EXHIBIT A d Through the Kitsap Regional Coordinating Council, jurisdictions should monitor issues that arse in implementing these policies, and should identify areas for improved coordination 6 All County, City, and federal governmental agencies shall be included in the normal public notice and comment procedures of other agencies and kept informed of matters of interest to them (RCW 36 70A 530) 7 The County, the Cities, and federal governmental agencies are encouraged to keep o another informed of matters of local and regional interest by mutually agreeable e s and schedule Adopted by Kitsap County Ordinance "'T�Tas adopted 40 rr,...,. t r e e 201 Date ofAdoption , �n CPP RATIFICATION RESOLUTION EXHIBIT A Element N. Roles and Responsibilities The County, Cities, Tribal governments, and special districts are all involved in planning activities related to their statutory authority and responsibility In addition to the responsibilities defined in previous countywide planning policies, this section further clarifies the planning roles and responsibilities of the Kitsap Regional Coordinating Council and member agencies Policies for Roles and Responsibilities MR): 1. The KITSAP REGIONAL COORDINATING COUNCIL was established by in cal agreement (see Appendix E) to assure coordination, consensus, consistency, a compliance in the implementation of the Growth Management Act and co e n planning by County, city and tribal governments within Kitsap County. a its Regional Coordinating Council also provides a voice for all jurisdictio op ortunity for citizens and stakeholders to provide input to planning policies t app countywide. The interlocal agreement adopted by the County, the C d the Tribal governments declared that the Kitsap Regional Coordinatin o il ' necessary to maintain a regular intergovernmental communication ne or ocal and tribal governments within the county, facilitate compliance w' co ination and consistency requirements of the Growth Management vide an effective vehicle to resolve conflict among and/or between jurisdiction 'th r ct to urban growth boundaries or comprehensive plan consistency, d to ' consensus on planning solutions for countywide growth management s The Kitsap Regional Coordinating Council shall: a Submit agreed -upon recommendations n a of member jurisdictions to multi- county regional agencies and State gove t oposed changes to multi- county regional plans, State plans, and laws b Provide a forum, as necess , fo chievmg coordination in the development of local plans and resolving planning p i lementahon issues that are common among jurisdictions c Promote coordmat c sistency among local plans and between local plans and the Countywide P o cies and the Growth Management Act to the extent necessary to achieve re pol ies and objectives Through the Kitsap Regional Coordinating Council actions should establish a process to monitor and review individual com a lans and associated implementation mechanisms to determine consistency with he ide Planning Policies d e e a orum for resolving disputes locally The process shall not preclude appeals to t ral Puget Sound Growth Planning Hearings Board if the local process has been ex sted without resolution of the dispute e romote coordination of educational programs and the dissemination of planning- related information of regional interest f Coordinate the review, revision and monitoring of the Countywide Planning Policies g Apply for grants and administer contracts relative to regional tasks and plans Adopted by Kitsap County Ordinance �"�ras adopted 41 Date of Ado tp ton "r,,.,, n ber 14 2011 CPP RATIFICATION RESOLUTION EXHIBIT A h Conduct the region -wide growth management planning consistent with these policies 1 Initiate and coordinate the development of other regional planning policies and implementation mechanisms that may improve the effectiveness of the comprehensive planning process J Define and implement procedures that assure opportunities for early and continuous public involvement in policy discussions facilitated by the Kitsap Regional Coordinating Council. 2. KITSAP COUNTY is the regional government within the county boundaries pr vi various services within unincorporated and incorporated areas as required speci d by law and by legal agreements. Kitsap County shall: a Be responsible for the development, adoption and implementation of c en a plans and development regulations and the processing of land use permits the u corporated portions of the county b Be responsible for coordinating water quality planning in in - un i onal watersheds and for other environmental planning activities as agreed a ected and interested jurisdictions c Be responsible for coordinating the response on th tmg o he federal Endangered Species Act in multi- lunsdictional watersheds agre all affected and interested jurisdictions d Be responsible for being a regional sew r der the unincorporated areas of Kitsap County as needed to improve water qu it on tent with levels of service outlined in the County Comprehensive Plan e Maintain a geographic inform n Sys to serve as a regional planning data base f Execute Urban Growth an ement Agreements with each city to address point issues identified in the ou t Planning Policies and other matters agreed to be of mutual interest drNl g Define and im r dures that assure opportunities for early and continuous public involvement t ou ort and long range planning projects 3. CITIES wi ounty provide a variety of services primarily to residents within their res 'v unicipal boundaries. Cities shall: a Po e ur n governmental services as identified in the Growth Management Act (Chapter 0 ) and adopted urban growth management agreements B ponsible for the development, adoption and implementation of comprehensive plans and development regulations and the processing of land use permits within the incorporated ortion of the respective city c Participate with other agencies in multi- lunsdictional planning activities including but not limited to environmental planning, e g water quality planning and coordinating the response on the listing for the Federal Endangered Species Act in multi- lunsdichonal watersheds transportation planning, and growth management strategies Adopted by Kitsap County Ordinance �"�ras adopted 42 Date of doption Xeve ntber 1,4 CPP RATIFICATION RESOLUTION EXHIBIT A d Execute a separate Urban Growth Area Management Agreement with Kitsap County to address point issues identified in the Countywide Planning Policies and other matters agreed to be of mutual interest e Define and implement procedures that assure opportunities for early and continuous public involvement throughout short and long range planning projects 4. SPECIAL DISTRICTS are governmental subdivisions of the county that are usually established to provide a defined scope of services. Special districts shall: a Be responsible for service provision, capital facility planning and other activiti authorized by law and legal agreements b Coordinate capital planning and implementation strategies with local go a assure consistency with comprehensive plan policies, the Countywide Plannin Po ies, and the WA State Growth Management Act; c Participate in service provision identification required in each wt management agreement, d Coordinate with other agencies as appropriate in multi- do planning activities, e Provide technical assistance as appropriate to asses cal v ents in comprehensive plan development, adoption and implementation f Encourage cooperative agreements and co of d hen possible to formalize participation in local and regional processes, g Define and implement procedures t t su o ortunities for early and continuous public involvement throughout short and n r planning projects h Site and size facilities con is rth I al plans 5. The County and Cities sh o in to with the County Department of Emergency Management to ensure t of the National Incident Management system and coordinated response 1he of disasters and other emergencies. 43 Adopted by Kitsap County Ordinance 4 as adopted Date of Adoption "'6• tuber 14 20 CPP RATIFICATION RESOLUTION EXHIBIT A Appendix A: Kitsap Countywide Planning Policy Ratification Process - - -Zt - Draft Revisions through County, City, & Tribal Councils review I possible revisions to the CPP's Planning Directors ` _ _ _ _ _ _ _ _ _ _ _ _ _ Th 'ts 'onal Coo C g ouncil Board A d commend CPPs • is s 's • eas draft for Public Comme Estimated Pu earing 3 Months Kitsap County iscuss CPP's Adoption by Ordinance • ecommend to County, Cities, & • SEPA Review Ae Tribes • Kitsap County Public Hearing • Kitsap County Ordinance City & Tribal Councils Ratify (may change document) • Resolution to Ratify (Within Estimated 90 days of County Ordinance) 2 Months ■ Yes Up to ■ No 3 Months • No Resolution abstention County Ordin e T s ffect If 2+ Cities don't Begin 60 d i to App GMHB 3+ Cities Ratify Ratify or Abstain: to KRCC for further discussion 60 days Note that the Kitsap Regional Coordinating a Council anticipates refinements 7ted by Kitsap County Ordinance "'was adopted to this process over time Date o�ptt "' vent.I " 2011 CPP RATIFICATION RESOLUTION EXHIBIT A ppendix B: Population Distribution 2005 - 2025 Through 2025 \ tion Distrbut>on 2000 + New = Total Annual 5 through 2025 Population Po ulation in 2025 Growth Rate Bremerton N city' 37,259 14,759 52,017 1 34° o ast UGA 5,412 2,210 7,622 1 °/ A st UGA 3,229 2,017 5,246 ^WQ Bremerton Port U 68 -68 0 Iff Central Kitnp UGA 21,743 8,733 30,476 1 /o Gorst UGA 154 73 227 56% Silverdale UGA 15,276 8,059 23,335 171% Bainbridge Island City 20,308 8,352 2X T 139% Kingston UGA 1,871 3,135 006 402% Poulsbo City 6,813 3,739 0, 177% UGA 901 3,355 4 6 641% Port Orchard City 7,693 3,60 T1,293 155% UGA 11,570 3 75 14,945 103% Port Orchard UGA Expansion 0 3 6 334 Stud Area ' South Kitsap UGA 1,2 9,265 837% UGA Population 133,537 '\\7 9f 76% 209,234 181% Non -UGA Population 98,432 4 , 05 24% 122,337 087% Total County Population 23 99,602 331,571 144% OFM Projection through 2025 0 268,573 059% ate 331,571 144% t 412,391 233% K p County Historical Growth I Based on PSRC M US 2 Based on City r unty Census Annual Comprehensiv or S - a 196N 84,176 Growth Rate �lammng 1970 N7,152 1,732 1 91 % Target t tiated by 1980 376% further a si d /or Sub -area 1990 1 731 257% 4 plammng 2000 231, 9 2 03 % Office of nancial 2004 239,50 080% Management official estimate Note Population Banking as described in Population distribution will be reviewed through the \ egional Kitsap County's Updated Comprehensive Coordinating Council process every five years The ill Plan LU -13 applies to the potential need include an analysis of the Cities' and County's progchievmg m specific UGA's (e g Central Kitsap) to target distributions If the 76% UGA target mentionfor new work with adjacent Cities to resolve unmet population growth and the overall population target population growth targets through an exceeded, the target for new population will revert tth UGAMA or to re- allocate population to (83 %), as per the revised County-wide Planning Poopte y other UGA's over time, through the Kitsap County Ordina nce #258 -01 on August 20, 20rwise, -2011 ffi Kitsap Regional Coordinating Council the target may be rearmed or explicitly modified , 2011 CPP RATIFICATION RESOLUTION EXHIBIT A Appendix B: Population Distribution Through 2035 Census Population 2035 Jurisdiction 2010 Growth Z Targets-' ON o Bremerton 37.729 14, 288 52, 017 Bremerton UGA 9,082 4, 013 13, 095 Total Bremerton 46,811 18, 301 65,112 City of Bainbridge 23,025 5.635 28,660 Island Cyy of Port Orchard 12, 323 8, 235 20.558 Port Orchard UGA 15.044 6.235 21,279 Total Port Orchard 27.367 14,470 41,837 0V o Poulsbo 9,222 1,330 1055 Poulsbo UGA 478 3.778 4 Total Poulsbo 9,700 5,108 17, O Central Kitsa UGA 22.712 7, 764 04 Silverdale UGA 17.556 5.779 Kin ston UGA 2.074 2 932 5.006 UGA (Includes Cities) 145,43 0 209, 234 Total Rural Non -UGA 105,699 3 122,337 Total Coun 251,133 0 331.571 1 2010 Census data re j7ects incorporakd Kc X and A boundaries as ofAu2ust 31 2012 2 Po pulation rowth reflects new re e h the 2035 lammn horizon 3 Chan es in ca or UGA boun urin t e planning honzon may affect the p opulation distributions Tha table updated penodicalA to reflect such changes These u dates dgw&wonst&te poha changes to the CPP's and will not re uire adoptAgnS r tzon by member a encies Adopted by Kitsap County Ordinance 476 -2011 C November 14, 2011 CPP RATIFICATION RESOLUTION EXHIBIT A Appendix C: Urban Growth Area Management Agreements The intent of the Urban Growth Area Management Agreement is to facilitate and encourage annexation and/or incorporation of urban areas over the 20 year planning period and to ensure compatibility of development within the unincorporated Urban Growth Area. Each Urban Growth Area Management Agreement shall: 1 Describe the goals and procedures of the point planning process including roles and responsibilities for the unincorporated Urban Growth Area, with the goal of having compatible City and Count lans, zoning, and development regulations The following provisions should apply to the entire r Growth Area associated with the City unless mutually agreed otherwise by the City and Coun a The City's zoning code, densities, and development, sub - division, environm I a, nstruction standards b The City's Levels of Service c The Comprehensive Plan of the City should reflect land use pl g th entire Urban Growth Area 2 Identify responsibility and mechanisms for comprehensive pl me ts, zoning changes and development applications within unincorporated Urban Gro h s ignificant weight should be given to City preferences 3 Identify services to be provided in the Urban Growt Are , e responsible service purveyors, and the terms under which the services shall be provided me in Fire Storm Wa olid Waste Police Potable to Park & Recreation Facilities Transportation Sewer— Schools Utilities Power and Tel uca ions, including broadband where available EMS All service providers, inclu4jft s cial stncts, and adjacent jurisdictions should be included in Urban Growth Area planning 4 Reference the adopted eve , e anng Inter -local Agreement, as appropriate (see Appendix D) 5 Develop pre-arm i p s, which shall include a Condrtio , ng rvice extensions upon actual annexation for properties contiguous to the City bou to greements of no protest to future annexation for properties not contiguous b annexation agreements to property owners interested in annexation and needing ran s from the City about services, planning, or other issues c Plan or tiering and/or phasing of infrastructure development, appropriate to the individual Urban Growth Area d City priorities for City -led annexation efforts as appropriate 6 Describe the development and implementation of a public involvement program that identifies roles and responsibilities for respective jurisdictions, including actions and timeline 7 Be reflected in County and City Comprehensive plans Adopted by Kitsap County Ordinance 476 -2011 C November 14, 2011 CPP RATIFICATION RESOLUTION EXHIBIT A Appendix D Interlocal Agreement Between Kitsap County and the City of Bainbridge Island, City of Bremerton, City of Port Orchard and City of Poulsbo Concerning Revenue Sharing Upon Annexation and In Conjunction With Major Land Use Decisions Within a City's Urban Growth Area Adopted by all parties in November- December, 2001 Effective November 24, 2010, the City of Port Orchard is officially withdrawn from this agreement Effective November 29, 2011, the City of Bremerton is officially withdrawn from this agr nt This Agreement, made pursuant to Chapter 39 34 RCW, is between KITSAP COUN er n er, the County), a political subdivision of the State of Washington, and the CITY OF BA LAND, the CITY OF BREMERTON, the CITY OF PORT ORCHARD, and the CITY U O, (hereinafter, the Cities), municipal subdivisions of the State of Washington WHEREAS, through the Kitsap Regional Coordinating Council, the Co t Cities have worked together constructively on revenue sharing issues that in the past hav een v anal, and WHEREAS, the County and Cities sought a balanced set of rev e s an rovisions that would benefit both the County and the Cities and support the orderl e u of logical land use patterns and jurisdictional boundaries, and WHEREAS, the County and Cities reached accord on of Principles of Agreement for Revenue Sharing in Annexations and in Mayor Land Use De ions, Va WHEREAS, the County and Cities desire to im . le nt Principles of Agreement through an mterlocal agreement, NOW, THEREFORE, in considerationaLthe in al covenants, terms and conditions contained herein, the parties agree as follows S 1 ANNEXATIONS The purpose of this sect n i to - vide a framework for logical and orderly annexations that are consistent with the Gro ana ment Act, Chapter 36 70A RCW (hereinafter GMA), and to mitigate the fiscal impact to the oun annexations initiated after the effective date of this agreement 1.1 The ac nfirm their willingness to eventually annex all land within their designated U a Area (hereinafter UGA) boundaries 1.2 a , 1 shall encourage annexation of all lands equally, and will support logical and nated annexations, consistent with the intent of the GMA part of the Kitsap Regional Coordinating Council's 2002 Work Program, the County and Cities will continue to address coordinated development within the UGAs, including infrastructure standards and funding 1.4 Before the County constructs a mayor infrastructure improvement within a City's designated UGA, the County and the City will negotiate and execute an mterlocal agreement that specifies the level at which the City shall reimburse the County for a portion of its investment in the infrastructure improvement if the area where the improvement is to be located is annexed within a specified period of time d Adopted by Kitsap County Ordinance 476 -2011 November 14, 2011 I CPP RATIFICATION RESOLUTION EXHIBIT A 1.5 The County and the Cities anticipate that each specific proposed annexation will require negotiation of other issues particular to its time, place and geography The Cities and the County commit to completing these negotiations and executing an interlocal agreement on such issues in a timely manner 1.6 As part of this agreement, the County will not oppose annexations within that City's designated UGA or invite the Boundary Review Board to invoke jurisdiction 1.7 The Cities agree to share with the County revenue lost to the County and gained ky the annexing City as follows A Revenue sharing payments shall be based on the following three sour o revenue 1 The County's portion of the local retail sales tax levied and Chapt 82 14 RCW 2 The ad valorem property tax levied by the County , uan o CW 36 82 040 for establishment and maintenance o n tr sportation systems 3 The admission tax levied by the County ant hapter 36 38 RCW B For purposes of this Section, "lost rev ue" me s an amount computed as follows The combined total of the Count 's Ile ons from all three sources within the annexation area d lendar year preceding annexation inus The combined tot C ty's collections from all three sources within the anne o unng the first full calendar year following annexation C The am n t e yment from the City to the County will be based on a three -year "soft lands Vppr c as follows ear 1 payment will be equal to 75% of the County's lost revenue 2 e ar 2 payment will be equal to 50% of the County's lost revenue Year 3 payment will be equal to 25% of the County's lost revenue e calculation of lost revenue pursuant to subsection B of this Section requires revenue data for one full year following annexation Therefore, the County shall initiate a request for payment under this Section by written notice to the annexing City within two years of the effective date of the annexation SECTION 2 MAJOR LAND USE ACTIONS The purpose of this section is to recognize that retail development near jurisdictional boundaries has an impact on neighboring jurisdictions and, in particular, on existing businesses and the demand for public services and facilities This Section is designed to mitigate these impacts by providing that sales tax revenues from new mayor business development within a City's designated UGA, or from the d Adopted by Kitsap County Ordinance 476 -2011 November 14, 2011 CPP RATIFICATION RESOLUTION EXHIBIT A relocation of an existing mayor business from a City to a location within the City's designated UGA, will be shared with the affected City 2.1 For purposes of this Agreement, "mayor land use" means A A new development within a City's designated UGA that houses any single retail tenant greater than 40,000 square feet B The expansion of an existing retail business within the City's designated UGr_4 if the expansion is greater than 40,000 square feet C A retail business greater than 25,000 square feet that is relocated fro Ci t City's designated UGA Or D An automobile, truck, recreational vehicle, manufactured or bile ho , , or boat dealership, regardless of the size of the building permitted, tha y located within a City's designated UGA, or relocated from a City to the d i ated UGA 2.2 The County agrees to share with the affected City reve o o e City and gained by the County due to a mayor land use, as follows A Revenue sharing payments will be required for c 1 retail sales tax revenues generated from mayor land uses Becaus here stations, related to confidentiality, on using a figure based on actual sales tWx ections from the new or relocated business, the revenue sharing payment will be ed on stimated sales tax revenues derived by using industry standards, such a W gton State Department of Revenue or the Urban Land Institute, for tax tai a es per square foot for businesses B For purposes of this Section, "los venue" means an amount computed as follows Total gross en 1 d bu ding square footage of the mayor land use X. Industry standard annual a a eta sales per square foot for category of business that most closely esembles the mayor land use x ax rate levied under Chapter 82 14 RCW for the first full ca year following the date on which the County issues a certificate of occupancy for the mayor an e ounty will make revenue sharing payments for the first full three years after the for land use receives a certificate of occupancy The revenue sharing payment from the County to the affected City will be calculated according to the following formulas 1 For the relocation of a mayor retail business from a City to the City's designated UGA a The Year 1 payment will be equal to 75% of the City's lost revenue, b The Year 2 payment will be equal to 50% of the City's lost revenue, and d Adopted by Kitsap County Ordinance 476 -2011 November 14, 2011 CPP RATIFICATION RESOLUTION EXHIBIT A c The Year 3 payment will be equal to 25% of the City's lost revenue 2 For new development within a City's designated UGA that houses any single retail tenant greater than 40,000 square feet, the payment amount will be 50% of the City's estimated lost revenue each year for the first three years F The calculation of lost revenue pursuant to subsection B of this Section requires revenue data for one full year following issuance of a certificate of occupancy Therefore, the affected City shall initiate a request for payment under this Section by writte otice to the County within two years of the date the mayor land use receives the Count ' ssion to occupy the building SECTION 3 MISCELLANEOUS 3.1 Duration. This Agreement will remain in effect until the terms o e Agr ent are fulfilled There is no other term agreed to by the parties 3.2 Reevaluation. Any City or the County may request imm to r v uation of this Agreement by the Kitsap Regional Coordinating Cou v Sharing Policy Committee If the reevaluation fails to yield a resolution satisfa the equestmg party within six months from the date the request for reevaluatio as d the requesting party may initiate the process for termination provided in this Agree t 3.3 Termination. After completion of the eeval on process required by this Agreement, a party may terminate this Agreement b on ' written notice to the other parties Termination does not extinguish the b ti of the terminating party under this Agreement for annexations initiated, or mad s for which an application is filed, prior to the effective date of termination 3.4 Filing. When fully exe d, t Agreement shall be filed with the Kitsap County Auditor 3.5 Notices. Any notic e it y this Agreement shall be delivered, or mailed postage prepaid, and add KitsgV Co u City of Bainbridge Island City of Bremerton Clerk to th oar City Clerk City Clerk Offic County City of Bainbridge Island City of Bremerton Bo mmissioners 280 Madison Avenue N 3456 1h Street, Suite 600 6 Di io Street Bainbridge Island, WA98110 Bremerton, WA98337 to 4 rchard, WA98366 y of Port Orchard City of Poulsbo Kitsap Regional Coordinating Council City Clerk Mayor Chair City of Port Orchard City of Poulsbo Kitsap Regional Coordinating Council 216 Prospect Street 200 NE Moe Street P O Box 1934 Port Orchard, WA98366 Poulsbo, WA98370 Kingston, WA98346 3.6 Administration. As this Agreement contemplates no point or cooperative undertaking, each party shall administer the Agreement as to its own responsibilities under the Agreement The d Adopted by Kitsap County Ordinance 476 -2011 November 14, 2011 CPP RATIFICATION RESOLUTION EXHIBIT A Kitsap Regional Coordinating Council shall oversee the revenue sharing process provided for in this Agreement 3.7 Reporting. The County and the Cities shall report to the Kitsap Regional Coordinating Council at the start of each calendar year any payments made or received by the reporting jurisdiction pursuant to this Agreement during the preceding calendar year 3.8 Waiver. The failure by the County or any City to enforce any term or condition of this Agreement shall not be construed to constitute a waiver of any other term or coniktion, or of any subsequent breach of any provision, of this Agreement 3.9 Entire Agreement. This Agreement includes the entire agreement of t respect to any matter addressed in this Agreement 3.10 Amendment. This Agreement may be amended only upon the w en agr ent of the parties made with the same formalities as those required for its on sm pujk7ecution 3.11 Countywide Planning Policy. To the extent that anythm his gLment may be found to be inconsistent with any part of the Kitsap County -wi olicy, the County and City in 2002 will review the applicable parts of the Cou - , Pl mg Policy and revise them in accordance with this Agreement 3.12 Review. The County and the Cities shall re w this eement within the Kitsap Regional Coordinating Council in December of 2 3, very five years thereafter 3.13 Effective Date. This Agreement shiptte ct retroactively to September 4, 2001, as this date has been expressly agreed u a th parties d Adopted by Kitsap County Ordinance 476 -2011 November 14, 2011 CPP RATIFICATION RESOLUTION EXHIBIT A Appendix E: Interlocal Agreement Establishing the Adopted by Kitsap County Kitsap Regional Coordinating Council and all four cities 3/21 - 6/20/01 THI GREEMENT is made and entered into by and between the undersigned members of the Kitsap Region a Coordinating Council, pursuant to provisions of the Inter -local Cooperation Act of 1967, Chapter 39 34 RC WHEREAS, a undersigned members recognize the need and desirability to participate in a f m for intergovernmen 1 coordination, cooperation, and consultation among member agencies in or ng about a continuou and comprehensive regional planning process and efficient service de e d WHEREAS, the and igned members desire jointly to undertake continuous coop a re nal development, land use, using, capital facility, service, and transportation pl g, an WHEREAS, it is the belief the undersigned members that regional deli n pl nning, and review should be accomplished when er possible by all jurisdictions affected hou ceive policy direction from all local general purpose an tribal governments, THEREFORE, in consideration of tual promises and cove is h i is hereby agreed 1 DEFINITIONS For the purpose of this ter -local Agree and a other agreements, contracts, and documents executed, adopted, or appro d pursuan4R this a eement, the following terms have the meaning prescribed to them in this sectio nle a to of their use dictates otherwise a "Member agency" means any public bo a party or becomes a party to this inter -local agreement and is a County, City, or federall cognized Tribal government within the region, b "State" means the State of W i on, c "Region" means the to p si lly lying within a boundaries of Kitsap County, d "Council" means t bo cal and tribal elected offi als designated in accord with the By -laws of the Kitsap R 1 Co rdinating Council to represent mber agencies to carry out all delegated powers and n d administrative responsibilities o e Kitsap Regional Coordinating Council, e "M " eans more than one -half of the votes cast when a orum is present and must i rity of votes from County representatives and a mason of votes from the se ives of at least two separate cities 2 ORGANI ATION — COMPOSITION AND NATURE The undersigned member agenc s constitute the Council Kitsap County, City of Bainbridge Island, City of Bremerton, City of Po Orchard, City of Poulsbo, the Port Gamble S'Klallam Tribe and the Suquamish Tribe Management o the Council is structured as provided herein and by the Council Bylaws Adopted by Kitsap County Ordinance 4'�r do ted e Date ofAdopti( i I I I i CPP RATIFICATION RESOLUTION EXHIBIT A AUTHORITY AND PURPOSES The Council has the following authorities and purposes To provide a regional forum for deliberations and cooperative decision - making by the region's elected officials in order to bring about a continuous and comprehensive planning process b T foster cooperation and mediate differences among governments throughout the region c To co dinate actions to provide for a sustainable economy and environment for the regWn d To carry o such other planning and coordinating activities authorized by majont t Council incl ing participation in other forums and organizations e To provide for a imstrative services necessary and incidental to the aforem nt ed ouncil activities 4 FINANCING The Council r elves funds from each member agency a ovi d the Bylaws and from other available funding sour c The Council may apply for funds a n re as may become available to assist the Council > carrying out its purposes and s S FISCAL YEAR AND BUDGET The fis 1 year coincides with t len ar year The Council adopts an annual work program and budget in a vance of each fi year identifies anticipated activities, goals, revenues, and expenditures for c pleting th wor gram A draft work program and budget is prepared by the Executive Committee est lashed by e B aws of the Council and is submitted for consideration and approval by the full Coun 1 th ouncil has approved the final budget it is forwarded to the County for inclusion as a cy fund within the Kitsap County Budget No increase or decrease to the final budget shal oc without the approval of the Council 6 WITHDRAWAL FROM AGREEMENT in ber ag cy has the right to withdraw from this Inter -local Agreement by giving the Coun si ( nthS prior ritten notice Unless otherwise provided by future agreement, any me mb a cy t withdraws sh 1 remain responsible for its financial and other obligations with regard to a sties until the effec ve date of withdrawal and with regard to agreements to which t 1 a party and which exist a the time of such notice of withdrawal Withdrawal by one me ber e cy to this Inter -local Agreem t shall not terminate the agreement as to any other remain gencies 7 DISPOSAL OF SSE on termination of this agreement any Coun c assets, after payment of all liabilithe S ex nses, and charges validly incurred under this agre ent, shall be distributed to all contra m er agencies in proportion to their contribution determi d at the time of termination Th e s, i rties, and obligations of the Council shall not constitute a d t, liability, or obligation of any be agency e Adopted by Kitsap County Ordinance a '�^14 as do ted Date of Adoption CPP RATIFICATION RESOLUTION EXHIBIT A Adopted by Kamp County. all four Cities and the Port of Bremerton 11122112-02114113 KITSAPREGIONAL COORDINATING COUNCIL Amendments to the 2001 ILA that established INTERLO CAL AGREEMENT KRCC were made in 2006 and 2007 THIS AGREEMENT is made and entered into by and between the undersigned parties pursuant to provisions ofthe Interlocal Cooperation Act of 1967. Chapter 39 34 RCW WHEREAS, the undersigned members recognize the need and destrabzhU to participate to a forum fo inter overnmental coordination cooperation, and consultation among member agencies in order to bring about tinuous and comprehensive regional planning process and efficient service delivery. and WHEREAS the undersigned members desire ioind . y to undertake continuous cooperative stud a ore tonal and zovernmental issues o mutual interest includinz but not limited to development, land use housin&ca DyMh ities service utilities trances public buildings. water su 1 water distribution and drainage, air and water o do ar and recreation transportation planninz and economic development. and WHEREAS it is the belief o the underst ned members that re tonal delzberationo. Wann g. Ind review can best be achieved with the creation o a se arate legal entity whose hinction and activities are su6ect to IN direction from the undersigned member agencies according to o the provisions ofthis Agreement. and WHEREAS the State Growth Mana ement Act GAM re wires local u Qdins to coordinate and ensure consisten when developing comprehensive land use plans and the undersigned memb estr a abhsh the Kitsap Re tonal Coordinatiniz Council as a separate le al entity to f acilitate coordination and1buistAgy o com rehenstve land use plans as required by the GMA. and WHEREAS the underst ned members desire to use the Ab D Reg nal Coordinating Council for developing Coun - wide Planning Policies CPPs under the GAM as a framffc4 u itsa Counjy and titres situated within the Counu to developing their comprehensive land use plans THEREFORE in consideration o mutual romises n covenants herein it is hereby a NAME This A vareem ent establishes the MCSaNAL COORDINATING COUNCIL "Council " a se arate le al enti since 2001 H. DURATION The A greem ent sh4lft to orce and effect peipetuall y or until terminated by maionty vote o the member agencies III. DEFINITIONS For th o is Interlocal Agreement, the following terns have the meaning prescribed to them in this section unless the c t their use dictates otherwise ember a en " means a votin and dues a in munici al or other overnment enti located wt Kitsa Coun which is a paLty to this A Bement B "State" means the State of Washington C "Region "means the territoaph sy tcally lying within the boundaries ofKitsap Count D "Kitsap Regional Coordinating Council" or "Council" means the separate legal enttta established by this Agreement to represent member agencies to carry out those powers and managerial and administrative responsibilities delegated pursuant to the provisions ofthis Agreement Adopted by Kitsap County Ordinance 476- 2014 adopted e Date of Adoption Xtvembei 9-z CPP RATIFICATION RESOLUTION EXHIBIT A E "Mmonu vote " means more than one -half of the votes cast when a quorum is present and must include a maiorty ofvotes om County commissioners and a malty of votes from the representatives ofat least two separate cities F `Executive Board" shall mean the representatives ofinember agencies of the Kitsap Regional Coordinating Council identified in Article IV B of this Agreement G "Cost Allocation " means annual dues (the annual allocation among Member agencies of the cost of Council operations determined by the Executive Board for the purposes ofcalculating members' obligations to contribute to the funding of Council operations for the year, and for the purposes of calculating obligations and distributions in the event ofwithdrawal or termination) H "Ex Qfficio Member" means a non - votinz non -dues paving member of the Council I "Two- thirds maiow vote" means a maior vote and also re uires a maignty o v es o 'Co', commissioners and a maiorgy_ofvotes from the representatives from at least two separate cities I's, J `Associate Member" means a member o the Council which is not a partv to th ement and who enters into a separate agreement with the Council that establishes the Associate Member's level o ar att in ouncil activities IV. MEMBERSHIP AND REPRESEN A Membersh;R Membership (except for Associate Members an io embers is established by execution of this Agreement and payment ofany required cost allocation as estabhshe the a five Board B Executive Board The Executive Board is com rise - he fol g re resentattves o member a encies I CounV Government three 3 mekkers o e Kitsap CounU Board of Commissioners 2 Cgy Governments a The May or of each ci h ing a Dopulation of 10 000 persons or less b The MavorZ None o the QV Council of each ct having a 12gRulation between 10 001 n,&on%nd TD. 000 persons C nd o 2 members of the Cgy Council of each city having a population reater th rsons d A A a Council /Mans er form o overnment may select one 1 member e QU Council instead o a Mayor The number o additional City Council members representing the city shall be as described in 2(a-c) above P rt o Bremerton one 1 representative consisting o a Port ommissioner A :1j;!W QU Council and Porto Bremerton representatives may be selected by whatever means established b each specific member agency for a two (2) year term C The determination of the population of cities will be the most recent annual population estimate of cities and towns prepared by the Washington State O ice of Financial Mana eg ment D A municipal or government entgy or a federall y recognized Indian Tribe that desires to become a member ofthe Council must obtain permission to do so by maiority vote of the Executive Board The required permission apphes to any entity that wishes to become a Member or Ex Officio Member A municipal or government entity or a federally recognized Indian tribe that wishes to become an Associate Member must obtain permission to do so by a maionty vote ofthe Executive Board and must present a draft agreement for the Executive Board's consideration, establishing the proposed terms, duties, powers and privileges for Associate Member status Adopted by Kitsap County Ordinance "' -.eras adopted e Date option "'w tuber 14 CPP RATIFICATION RESOLUTION EXHIBIT A V POWER, AUTHORITY, AND PURPOSE This Agreement does not confer additional substantive powers or authorities on member agencies The powers and authorities conferred herein are limited to the powers that each member agency is authorized by law to perform The Council has the following power, authority, and purpose A Provide a regional forum for regional deliberations and cooperative decision - making by the region's elected officials in order to bring about a continuous and com planningprocess, and foster cooperation and mAate differences among governments throughout the region B Consistent with the GALA coordinate and ensure consistent when developing tom re v e plans C Consistent with the GAM develop CPPs to be used as a amework to -guide the C 4n nd t Cities in developer their comprehensive land use plans. D Coordinate actions to provide for the distribution o state and ederal r n tnc din but not limited to f ederal trans ortation fii ndinz commungy develo mint block rants and low income h in n E Undertake continuous cooperative stud and planning ore io n o ental roblems o mutual interest includiniz but not limited to development, land use housing, capital fac&es ices. utilities finances, public buildings water syRR water distribution and drainage, air and water pollution, j2arkAnd r ea 6n and trans ortation plannin F Coordinate actions to provide for a sustainable econam anNglm or the re ion G CaM out such other planning and coordinatin ivities a thorized by maionU vote of the Council includin participation in other forums and organizations OF H Establish Bylaws, to be amended from a that govern the procedures of the Council The Bylaws, as may be amended are inco1porated into this Agreement bj thil r erence as i ull set orth herein V F I Contract for administratev s a enter into other agreements as deemed yppropriate and /or necessaa to implement this Agreement J Purchase receive i t or otherwise acquire, own hold improve, use and otherwise deal in and with real or ersonal 12=eLty. opgot n ergs t erein to the name o the Council K Sell cony t a L- Dledize, lease exchanize, transfer and otherwise des ose of its PropfM and assets L Sue e ed complain and defend, in all courts o com etent lurisdiction in the Council's name M o a e n any other activiV necessaa to fiirther the Council goals and puiposes to the extent authorized b chapter 39 3 X =,, r such federal. state or p rivate fu nding ofany nature as may become available to assist the organization in ca in tits u oses and functions O Identify and examine issues such as governance, growth policies, development standards, service provision, revenue -cost sharing and municipal annexations in urban growth areas P Strive to represent the consensus o views on growth management and planning issues among member agencies The Council makes recommendations on behal of those jurisdictions to multi- county gional agencies and State government on behalfofinember agencies, on proposed changes to multi - county regional plans, state plans and laws Q Represent the views or position of member agencies within the County on issues o consistency or the resolution o conflicts related to the multi - county regional growth strategy and transportation plan Adopted by Kitsap County Ordinance "'�Tas adopted e Date of Adoption ;" • 14 - , " CPP RATIFICATION RESOLUTION EXHIBIT A R Make appointments to committees and boards ofmulti- county regional organizations (e g Puget Sound Regional Council, Peninsula Regional Transportation Planning Organization) where appointments are requested to represent more than one member aizency ofthe Council Members appointed to such committees and boards shall represent the consensus of the views of the Council Ifconsensus is not reached on a particular issue, the members appointed to such committees and boards shall represent the majority and minority views ofthe Council, in order to accurately portray the status of discussions on that issue S Review this Interlocal Agreement no fewer than every 10 years with the assistance of legal counsel VI. FINANCING A Cost Allocation All members shall 12ay the annual cost allocation as described in the B I Davin nt b a member is not aid time. after notice ofthe cost allocation is received the member is sub ect to having r status revoked by malty vote of the Executive Board B Local Government Accountin ro All services and transfers o er to the K a Re i Coordinatin Council shall be paid and accounted for in accordance with RCW 43 09 210 M. FISCAL YEAR AND BUDGE A The Fiscal Year The scat ear shall coincide with the calen B Ado lion o Bud et B Se timber o each ear the Execute oar shall ado t a draft annual work ro ram bud et and cost allocation for the ensuin fiscal year that identifies an=Dated goals. revenues and ex enditures fo r completing the work program The final work program, budget. and At Jffixation for the ensuing ear shall be ado ted by the Executive Board no later than November of each year No increas decrea a to the final budget shall occur without the approval ofthe Executive Board or C Notice ofBudizet On or before Se to a xecuteve Board shall rovede written notice o the ensuen ear's draft budget. work plan, and cost allocation to the dese n e re resentative s o each member agency On or be ore November 30 the Executive Board shall provide wxwkn notic - the final budget, work 121an. and cost allocation ado ted for the ensuing scat year to the designated re resent e s ach member azenc J2 D Accountin Budgeting. d or The Council shall be sub ect to the Budgeting Accounting & Re ortin S stem BARS 012licable to Cate o c ove ments E Fiscal A ent unit a retain a fiscal a ent The fiscal agent may be a member azency who shall serve and be sub ect to removal pursAant to e s and conditions as established by agreement between the fiscal agent and the Council F Co n 11 contracts made by or on behal o the Council shall be in accordance with state law includin but not limited to C a ter CW and Chapter 42 23 RCW. and Chapter 42 24 RCW VIII. WITHDRAWAL FROMAGREEMENT em agency has the right to withdraw om this Interlocal Agreement by even the Executive Board six 6 months rt ritten notice Unless otherwise provided by ture agreement. any member agency that withdraws shall remain res onsible &A is financial and other obli ations with regard to Council activities until the effective date o withdrawal and with regard to agreements to which the Council is a party and which exist at the time ofsuch notice of withdrawal Withdrawal by one member agency to this Interlocal Agreement shall not terminate the Agreement as to any other remaining member agencies Except as provided in Article Mof this Agreement, any member agencv that withdraws from this Agreement forfeits any rights it may have to the Council's assets, provided, however, such forfeiture shall not take effect if the Council dissolves within one (1 ) year ofthe date of the withdrawal notice Adopted by Kitsap County Ordinance 9eras adopted e Date ofAdoption "gaember 14,Z CPP RATIFICATION RESOLUTION EXHIBIT A Ix DISPOSAL OF ASSETS Upon dissolution ofthe Council any Council assets after -payment ofall liabilities costs expenses and charges validly incurred under this Agreement, shall be distributed to member agencies which are members ofthe Council on the date of dissolution Distribution ofassets shall be in proportion to the fu_ ndtne ormula for cost allocation as described to the Bylaws to accordance with Article VI B ofthe Agreement and existing at the time ofdissolution The debts liabilities and obligations ofthe Council shall not constitute a debt liability or obligation ofanv member agen!a lfassets cannot reasonably be distributed to proportion to the funding formula the Council shall declare the assets to be surplus and shall offer the assets for sale according to the requirements ofchapter 4319 RCW and shall distribute the proceeds from the sale in pLOportion to the funding fonnula established by the Executive Board in accordance with Article VI B ofthis Agreement K MBILITYAND INSURANCE A Any loss or liability to third parties resulting from negligent acts errors or omissto o ku it Member a encies excludtn Associate Members Ex O tcio Members and /or employees while acting withAhAgope o their authort under this A reement shall be borne by the Council exclusive) y. and the Council shall defend SU4 Darties.'%Wv cost u on re uest by the member agenc. ex officio agency and /or employee B The Executive Board shall obtain commercial izeneral ltabtli )tab and a i urance coverajee for the Council Executive Board and any sta em to ed by the Council at levels no less than^ullzol sin le occurrence and 2 million aggregate or each We ofhabihU that is insured The Polia shall name o& anift&w. and their Les ective elected officials, officers, agents, and employees as additional insured's The E ti oar shall annually evaluate the adequacy ofthe Council's insurance coverage C The Executive Board shall re uire that all contracto nd sub actors utilized by the Council obtain insurance coverage consistent with Article X B XI LEGA P E ATION The Council may retain le al counsel Le al co6ft an em to ee o a member azenCE, an outside entiM or an individual In the event o a conflict of interest the Coun it Av r substitute or additional le al counsel Additional) Council may retain outside le al counsel concerningwany matt6Ae Council deems appMpnate Retained counsel shall serve and be sub ect to removal pursuant to the teens andtfondiMbgs es ablished by ajzreement between le al counsel and the Council An ad ustment in cost allocation to Members wzZMe7We ifilhe Council retains outside legal counsel XI ENTIRE AGREEMENT This A reement su erse Drevi s Kitsap Re tonal Coordinatine Council interlocal aggreements and all prior discussions representations, co tract n r a reements between the Parties relating to the sub ect matter o this Ajzreement and constitutes the entire contrWkk een narties XIII. MODIFICATION Exce t aS D(ided Article =. the terns of this Agreement shall not be altered or modified unless a -reed to in writin hv all membe ie such wntin shall be executed with the same formalities as are re uired for the execution o this document XIV WAIVER The failure ofanv party to insist upon strict pe1formance ofany ofthe teens and conditions ofthts Agreement shall not be construed to be a waiver or relinquishment ofsame but the same shall be and remain in fidl force and a ect XV NOTICE Except as provided in Article XVIII ofthts Agreement any notice required by this Agreement shall be made in writing to the representatives) identified in Article IV B ofthts Agreement Notice is effective on the third day following deposit with the US Postal Service, regular mail e Adopted by Kltsap County Ordinance 9w as adopted Date ofAdol2tion Xqvember 14 2011 CPP RATIFICATION RESOLUTION EXHIBIT A XVL SEVERABILITY Ifany of the provisions o this Agreement are held illegal, invalid or unenforceable the remaining provisions shall remain in full force and a ect XVII. CHOICE OF LAW AND VENUE This Agreement shall be governed by the laws of the State of Washington both as to its interpretation andped'ormance Any action at law, suit in eguity. or other iudicial proceeding arising in connection with this Agreement may be instituted and maintained only in a court o competent jurisdiction to Kitsap County Washington XVIII. CLAIMS A Any claim for damages made under chapter 4 96 RCW shall be filed with the Chair o the Ki a Regional Coordinating Council clothe Clerk o the Kitsa Coun Board o Co i ners 14 Division Street, MS -4. Port Orchard, Washington, 98366 B U on receipt o a claim or damages, or any other claim a cQpv o the cl it a vided by the Clerk o the Board to each member ofthe Executive Board X A �S IX EXECUTION AND FILI A 10) A Counteiparts The parties agree that there shall be multmKorign 1 s ature Dages of this Agreement distributed for si nature by the necessaa o icials of the parties U on execu the Y ecuted original signature pages of this Ajzreement shall be returned to the Clerk o the Kamp Counjy Board ofigommissWrs, who shall file an executed on final o this Agreement with the Kitsap CounU Auditor The Clerk of the Board A duplicate conformed copies o the Agreement to each o the Darties Parties that sijzn on as Members at a later will D r ide original signature pages of this Agreement to the Clerk of the Ki a County Board of Commissioners who ikall f Ashe nature Dages provided with the Kitsep Coun Auditor The Clerk o the Board shall distribute duplicate conLrAi co es of the signature pages filed later to each o the p arties Addition ofparties at a later date will not constt &dAation under Section XIII o this A reement B Later Approval and Filing Latergagwroval filine of this Agreement by additional parties as set forth in Article IV Section D shall be deemed an autho ed a dment to the A reement alread on file with the Kitsap County Auditor without the need for reconsideration and a va a tes that have alread approved and executed the Agreement EFFECTIVE DATE This Ajzreement shall eaamut&e ct a one and between the parties upon its execution by all of the parties, as evidenced by the si natures and dates afi4d be upon its filing with the CountE Auditor as Drovided in Article WX Adopted by Kitsap County Ordinance a'�ras adopted e Date o Adoption Tr..•'., r 14 011 CPP RATIFICATION RESOLUTION EXHIBIT A Adopted 2004 Appendix F: Regional and Kitsap Designated Centers U Regional City of Bremerton Metro Center (Adopted by PSRQ Silverdale Urban Core Urban Center South Kitsap Industnal Area Industnal/Ernplo a nter Jurisdiction Jurisdiction's (Comp Plan Designation KR to a nation Kitsap County Kingston T r Ci C nter/Trans ortation Hub Kitsap County Southworth Iff m Hub Kitsap County Suquamish vit m to ent Center- Transportation Hub City of Bremerton Harrison Employment Center ct y/Employment Center City of Bremerton NW Corporate Campus Employment Center ativity/Employment Center City of Bremerton Port Blakely Employment Center ctivitv/Emvloyrnent Center City of Bremerton Upper Wheaton District Center Mixed Use Center/ Neighborhood City of Bremerton Lower Wheaton District Center Mixed Use Center/ Neighborhood City of Bremerton S lvan/Pme Neighborhood Center Mixed Use Center/ Neighborhood City of Bremerton Perry Avenue Neighborhood Cent Mixed Use Center/ Neighborhood City of Bremerton Manette Neighborhood Center Mixed Use Center/ Neighborhood City of Bremerton Charleston Neighborhood Center Mixed Use Center/ Neighborhood City of Bremerton Haddon Neighborhood C Mixed Use Center/ Neighborhood City of Bainbridge Island Winslow Core Town or City Center City of Bainbridge Island Day Road Light M of ea Activity/Employment Center City of Bainbridge Island Lynnwood - Ne b od ce Centers* Mixed Use Center/ Neighborhood City of Bainbridge Island Rollin Bay - ei o Service Centers* Mixed Use Center/ Neighborhood City of Bainbridge Island Island Ce i rood Service Centers* Mixed Use Center/ Neighborhood I Ci of Poulsbo Poulsbo own n r Town or City Center F C - 1 - W — of Poulsbo O Mixed Use Center/ Neighborhood City of Port Orchard d ort - O — rrhard Town or City Center/ Transportation Hub City of Port Orchard o mmunity Services Activity/Employment Center City of Port Orchard Sout K tsa Mall - Mixed Use Center Mixed Use Center/ Neighborhood Kitsap Transit c Mosquito Fleet Terminals Trans ortation Hub '�- Special PI a f Adopted by Kitsap County Ordinance ° adopted Date of Adoption #r ember12011 CPP RATIFICATION RESOLUTION EXHIBIT A Appendix G: Centers &Local Areas of More Intensive Rural Development (LA MI Tr i x Mixed Use High a ral Fundin C cles Type of Growth UGA Criteria Apply Density SR - managed Transportation (per GMA) Residential with ding Centers & Corridors Jobs Incorporated UGA Urban Yes N/A Unincorporated UGA Urban Yes es N/A PSRC Centers Regional ' • Regional Urban Yes ye Competitive • Industnal/Employment Countywide Kitsap Regional Coordinating Council Centers Town/City Center Urban Y Yes Mixed Use/Neighborhood Urban s Yes Countywide Employment/Activity Urban if in UGA, Rural if o si G Limited if not in Transportation Hubs Urban if in UGA, Rural is A UGA Fully Contained Communities Urban Yes Yes Countywide if designated as Kitsap Center Master Planned Resorts Recreational No Limited Rural set -aside ** Limited to I 1 Existing density LAMIRDs Cons to t No with Rural set -aside ** E ara ter no intensification of use Industrial in Rural oym t/Activity No No Rural set -aside ** es r sed Industrial Rural Non -urban No No Rural set -aside ** oral Character Resource Lands o Residential Growth Limited No Rural set -aside ** on- motonzed/Enhancement Transportation Funding can be used anywhere in Kitsap County ** 10% each funding cycle, set by federal statute (199 1) Adopted by Kitsap County Ordinance 7 -'was adopted g Date ofAdoption Xqvember 14,Z