HomeMy WebLinkAbout5320 Contract Number: 5320
Vendor: LAKESIDE INDUSTRIES, INC
Subject: Belfair Valley Road and Lake Flora Road Preservation
Proj
Department: Engineering
File Class: LEG 12 -1
Begin Date: 10/28/2013
End Date:
Review Date: 6/1/2014
Vault Date:
Comments: CO #1 5/23/14
CITY OF BREMERTON
CHANGE ORDER
CONTRACT CHANGE ORDER NO: 1
PROJECT NAME: Belfair Valley and Lake Flora Roads Preservation Project
PROJECT NO: 4283 CONTRACTOR: Lakeside Industries, Inc.
ORIGINAL CONTRACT AMOUNT: $382,918.00 DAYS: 30
PREVIOUSLY APPROVED CHANGES: $0.00 DAYS:
THIS CHANGE: $18,923.81 DAYS:
REVISED CONTRACT AMOUNT: $401,841.81 DAYS: 30
This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish
equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The
increase or decrease in contract price shown below includes any applicable taxes.
DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT
O — CONTRACT CONTRACT TIME
AMOUNT AMOUNT EXTENSION
W ($) ($) (DAYS)
X 1. Schedule A
1.1. Furnish and place commercial HMA asphalt for pre -
leveling on Belfair Valley Road. The work includes
compaction of HMA, and traffic control. This will be
under Pay Item 12, "Preleveling ".
150 tons x $84 $12,600.00
1.2. Dig out an area of 10' x 26' plus approximately 5' of
shoulder on both sides. Digging to a depth of 20" to
24" on the uphill side to 30" to 36" on the downhill
side. Place geofabric on top of the subgrade that will
wrap the 8" permeable ballast that will be placed
between the subgrade and the 8" CSTC. Place
permeable ballast on uphill side and downhill side.
The work includes traffic control. This is a lump sum
work. This will be under Pay Item 13, "Pavement Dig
Out - Belfair Valley ". $7,000.00
1.3. Dig out 3 inches thick of the existing subgrade over an
area of 15' x 24', then replace with HMA at the east
end limit of the project on Lake Flora Road. The work
includes compaction of subgrade and HMA, and traffic
control. This is a lump sum work. This will be under
Pay Item 14, "Pavement Dig Out — Lake Flora ". $5,000.00
1.4. Quantity Variation — The balance between quantities
overrun and quantities underrun ($5,676.19)
NET CHANGE IN CONTRACT AMOUNT $24,600.00 ($5,676.19)
INCREASE OR (DECREASE)
CONTRACT CHANGE ORDER NO: 'I
PROJECT NAME: Belfair Valley and Lake Flora Roads Preservation Project
Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or
nature arising from or connected with any work either covered or affected by this Change Order, including, without
limitation, claims related to contract time, on -site or home office overhead, or lost profits. Nothing in this Change Order
shall limit the City's right to bring a claim for past performance.
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price
specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in
work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order.
This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this
Change Order shall be effective when approved by the City of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on
the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall
take appropriate action to modify any bonds required under the contract to address this change.
RECOMMENDED:
PROJECT ENGINEER Date
RECOMMENDED: /
IT& NGINEE I CTOR OF PU IC WORKS Date
ACCEPTED:
C TRACTOR Date
APPROVED: 5 ,2 31 1
MAYOR Date
APPROVED AS TO FORM: ATTEST:
(22z2z I "q
Bremerton y torney / 577 City Clerk
Page 2 of 2
Contract Number
Vendor
Sub�ect
Department
File Class
Begin Date
End Date
Review Date
Vault Date
5320
LAKESIDE INDUSTRIES, INC
Belfair Valley Road and Lake Flora Road Preservation
Pro�
Engineering
LEG 12-1
10/28/2013
6/1/2014
Comments
Local Agency Contract
THIS AGREEMENT, made d entered into th�s Z� day of �'T�� ,�13
between the , and the �� � �jl`C�C� `t
(�.�x�+� �'��5tn'��S � SN�-- under and by vutue of Title 47 RCW, as amended and
hereinafter called the Contractor
WITNESSETH
That in consideration of the tenns and cond�t►ons contained herein and attached and made a
part of tivs agreement, the parties hereto covenant and agree as follows
The Contractor shall do a11 worl. and furmsh all tools, matenals, and equipment for
�l�72. y�l'+-� /4rih �K.L' �i.�M RoAps �l 1�2.oT[.
ui accordance wrth and as descnbed ui the attached plans and spec�fications, and the
sta.ndard specificataons of the which aze by this reference ir►corporated hereu► and made part hereof
and, shall perform any changes ui the work in accord wtth the Contract Documents
�,
The Contractor shall provide and bear the expense of a11 equipment, work and labor, of any
sort whatsoever that may be required for the transfer of matenals and for constructmg and
completing the worl. provided for ui these Contract Documents except those rtems mentioned
therem to be furtushed by ,
II hereby promises and agrees with t�ia Contractor to employ, and does einploy the
Contractor to provide the matenals and to do and cause to be done the above descnbed work and to
complete and fmish the same m accord wrth the attached plans and spec�fications and the terms and
condit�ons herein contained and hereby contracts to pay for the same accordmg to the attached
specifications and the schedule of umt or item�zed pnces at the t�me and ui the manner and upon the
condihons prov�ded for m tlus contract
SR
City of Bremerfon
BVR and LFR Preservat�on Pro�ect
Contract Documents
DOT Form 272 OO6A EF
072071
Bremerton Pro�ect No 6187
l-p2 September 2013
Loca/ Agency Contract — H�ghway Construct�on
III The Contractor for lumself/herself, and for h�s/her heus, executors admm�strators,
successors and assigns does hereby agree to full performance of all convenants required of the
Contractor m the contract
IV It is further provided that no l�abi(ity shall attach to the State by reason of entenng
uito this contract, except as provided hereui
IN WITNESS WHEREOF, the Contractor has executed this uistrumerrt, on the day and year
first below wntten and has caused this ulstrument to be executed by and m the name of the day
and year first above wntten
Executed by the Contractor O�'���" � � ,��3
��s►vE i,�wsr2�ES, ��..
r
'�� �sro�l CW �Ta.6q�5vrt['�.
(Contraaor)
Local Agency lii �i� �Z�''2�� �� �
•
: �� �/ �"f
�. - � �
SR
C�ty of Bremerton
BVR and LFR Preservat�on Pro�ect
Contract Documents
DOT Form 272 OOBA EF
Wl2011
Bremerton Pro�ect No 6187
I-23 September 2013
Loca/ Agency Contract — H�ghway Construction
Contract Documents For
Belfair Va91ey Road and Lake Flora Road Preservation Project
City of Bremerton Pro�ect No 6187
Federal Aid No STPUS-9918(013)
Bid Oaen�na.
10 00 a m, October 7, 2013
City Clerk's Office, City HaH
345 Sixth St�eet, Suite 600
Bremerton, WA 98337-1873
Contact Person
Gunnar Fridriksson, PE
Public Works � Utd�ties Engineenng Division
3027 Olympus Drwe
Bremerton, WA 98310
Tel (36Q) 473-2354
FAX (360} 473-5398
Addendum No 1
�
�
�
�
�
PART I
� BIDDING REQUIREMENTS AND CONTRACT FORMS
��
�;
��
ll
�
�
�
�
�
�
�
1
�
�
�
i
�
�
NOTICE INVITING BIDS
FOR
BELFAIR VALLEY ROAD AND LAKE FLORA ROAD PRESERVATION PROJECT
RECEIPT OF BIDS Sealed Bids wdl be received at the office of the City Clerk of the
C�ty of Bremerton, located at 345 6th Street, Bremerton, Washington 98337 until 10 00
A M PST as shown on the wall clock mside the City Clerk's office on October 7, 2013,
for the pro�ect Belfair Valley and Lake Flora Roads Preservation Pro�ect Bids
received after the specified time and date will not be considered
OPENING OF BIDS The bids will be pubiicly opened and read after 10 00 AM on
� October 7, 2013, in the office of the City Clerk at 345 6�' Street, Bremerton, Washmgton
98337
�
�
�
�
COMPLETION OF WORK The WORK must be completed within thirty (30) working days
after the commencement date stated m the Notice to Proceed
DESCRIPTION OF WORK The WORK to be completed under this Contract
generally consists of asphalt repairs, overlay with reinforced hot m�x asphait, and
traff�c control for approximately thirteen thousand (13,000) feet of roadway
PREVIEWING CONTRACT DOCUMENTS Contract Documents may be previewed on
printer ARC (formerly known as Reprographics Northwest) website (www e-arc com)
Go to http //www e-arc com/locations/219, click on the `Public Planroom' tab and scroll
down to find the pro�ect
�` PURCHASING CONTRACT DOCUMENTS The Contract Documents may be ordered
� from ARC Payment is typically cost of reproduction (non-refundable) Contact Bid
Services at ARC in Tacoma, WA 1(800) 337-8103, FAX (253) 272-4064, E-mail
� tacoma bidserncesCa�e-arc com
PROPOSALS All b�d proposals must be made on the blank forms furnished in the
� Contract Documents Sealed envelopes containing bids shali be entitled Belfair Valley
and Lake Flora Roads Preservat�on Pro�ect
�
��
B1D SECURITY Each bid proposal shall be accompanied by a bid proposal depos�t m
cash, certified check, cashier's check, or surety bond m an amount equal to five percent
(5%) of the amount of such bid proposai The failure to furnish a bid deposit of a
minimum of 5 percent shall make the bid nonresponsive and shall cause the bid to be
re�ected by the Contractmg Agency
� PERFORMANCE BOND The successful bidder will also be required to provide a
PerFormance Bond for 100 percent of the Contract Price Should the successful bidder
fail to enter into such contract and furnish satisfactory performance bond within the time
� stated in the specifications, the bid proposal deposit shall be forfeited to the City of
Bremerton
City of Bnsmerton / Bremerton Pro�ect IVo 6187
� BVR and LFR Preservat►on Pro�ect I-1 September 2093
Contract Documents Not�ce Inwting B►ds
,
PROJECT COMMUNICATION All communications related to the pro�ect shall be directed
to the City prior to opening of Bids
Communication bv phone/fax
Gunnar Fridriksson
Telephone (360) 473-2354
Facsimile (360) 473-5398
Communication by mad
Department of Public Works and Ut�lities
Engmeering Division
3027 Olympus Drive
Bremerton, WA 98310
ATTN Gunnar Fridriksson
CITY'S RIGHTS RESERVED The City of Bremerton reserves the right to re�ect any
and all bids on any or ali schedules or alternates or to waive any informalities in the
bidding and shall determine which bid or bidders is the most satisfactory and
responsible bidder and shall be the sole �udge thereof
No plea of mistake in the bid shall be available to the bidder for the recovery of his/her
deposit or as a defense to any action based upon the neglect or refusal to execute a
contract
The City of Bremerton in accordance with Title VI of the Civil Rights Act of 1964, 78
Stat 252, 42 U S C 2000d to 2000d-4 and Title 49, Code of Federal Regulations,
Department of Transportation, subtitle A, Office of the Secretary, Part 21,
nondiscrimination in federally assisted programs of the Department of Transportation
issued pursuant to such Act, hereby notifies all bidders that it will affirmatively msure
that in any contract entered into pursuant to this advertisement, disadvantaged business
enterprises will be afforded full opportunity to submit bids in response to this invitation
and will not be discriminated agamst on the grounds of race, color, sex, sexual
or�entation or national origin in consideration for an award
END OF NOTICE INVITING BIDS
C�ry of Bremerton
BVR and LFR Preservation Pro/ect
Contract Documents
I-2
Bremerton Pro�ect No 6187
September 2013
Nohce Inv�t�ng Brds
�
�
l
�
�
�
�
�
�
�
�
�
�
�
�
r
�
�
�
�
�
�
�
�
�
�
�
�
BIDDER'S CHECKLIST
This section I�sts the contract forms required for this pro�ect The bidder's attention is especially
directed to the forms that must be executed in full as required and submitted with the bidder's
bid These are indicated as follows in the section titled "Bid Documents "
BID DOCUMENTS
These documents must be executed and submitted to the City with your bid, no later than the
designated bid ciosmg date and time Bids that do not include all of the requ�red forms, properly
completed, may be declared unresponsive
2
3
4
5
Proposal Bond
This fo�m to be executed by the bidder and the surety company uniess bid is
accompanied by a certified check The amount of this bond shall be not less than five
percent (5%) of the total amount bid and may be shown in dollars or on a percentage
basis
Non-Collusion Declaration
B�dder's Subcontractor Contact Report
Local Agency Subcontractor List
Certification of Non-Segregated Facilities
� 6 Contractor's Registrat�on
The successful Bidder shall acquire and/or possess a current City of Bremerton
Business License and any other licenses and permits which may be required to fulfill
the obligations of the Contract as specified Business and occupancy (B&O) taxes
� shall be paid when due and the CONTRACTOR will agree to assign any payments due
to the City Clerk for payment of such taxes which have been declared delinquent
�
7
8
9
10
Bid Proposal
Proposal Form
Local Agency Disadvantaged Busmess Enterprise Utilizat�on Certificat�on
Form 272-056A EF
Locai Agency Disadvantaged Busmess Enterprese (DBE) Written Confirmation
Document Form 422-031A EF
�
�
�
�
11 B�d Certeficate
Bids by corporations must be executed in the corporate name by the president, a vice-
president, or other corporate officer Such Bid shali be accompanied by the enclosed
Certificate of Authority to sign, attested by the secretary or assistant secretary, and
with the corporate seal affixed The corpo�ate address and state of mcorporation must
appear below the signature
Bids by partnerships must be executed m the partnership name and be signed by a
� managmg partner, accomparned by the enclosed Certif�cate of Authority to sign, and
his/her title must appear under the signature and the official address of the partnership
must appear below the signature
� C�ty of Bnemerton Bremerton Pro�ect Ido 6187
BVR and LFR Preservatron Pro�ect I-3 September 2013
Contracf Documents Bidders Checkl�st
��
�
Bids by �oint ventures must be executed in the �oint venture name and be signed by a
�omt venture managmg partner, accomparned by the enclosed Certificate of Authority
to sign, and his/her title must appear under the signature and the official address of the
�oint venture must appear below the signature
Bids by limited liabdity comparnes must be executed in the limited liability company
name and be signed by a member, accomparned by the enclosed Certificate of
Authority to sign, and his/her title must appear under the signature and the official
address of the �oint venture must appear below the signature
12 Information Requ�red of B�dder
In selecting the lowest responsive, responsible Bidder, consideration will be given to
the general competency of the Bidder for the performance of the WORK covered by
the Bid To this end, each Bid shall be supported by a statement of the Bidder's
experience as of recent date on the form entitled "INFORMATION REQUIRED OF
BIDDER" bound herein
Documents to be Executed bv the Successful Bidder
The followmg forms are to be executed after the contract is awarded These forms must be
submitted within five (5) calendar days after the date of Notice of Award of Contract
1 Contract
2 Contract Certificate
3
4
Local Agency Pertormance Bond and Payment Bond
To be executed by the successfui bidder and its surety company
Insurance Certificates
Documents to be Executed Prior to First Pavment
The followmg form is to be executed pnor to first payment
Statement of Intent to Pay Prevail�ng Wages, Department of Labor and
Industries
�
�
�
�
�
�
�
�
�
�
�
�
�J
�
�
i
C�ty of Bremerton
BVR and LFR Prese►vatron Pro�ect
Contract Documents
I-4
Bremerton Profecf No 6187 �
September 2013
B�dder's Checkl�st
�
���
�
�
�
�
�
�
�
r
�
Fa�lure to return this �eclaration as par# of the bid proposal package
w�ll make the b�d nonrespons�ve and �nel�g�bte for award
N4N-COLLUSION DEGLARATIOIV
i, by s�gmng the proposal, hereby declare, under penalty of
peryury under the laws of the Umted States that the followmg
statements are true and correct
2
That the undersigned person(s), flrm, associat�on or corporation has
(have} not, either directly or indi�ectly, entered mto any agreement,
partiapated m any coilusion, or otherwise taken any action in restraint of
free compet�tive bidding m connection w�th the project for which this
proposal is submitted
?hat by signmg the signature page af th�s proposal, I am
deemed to have sEgned and to have agreed to the provisions
of this declaration
.. _
� • _ • - ._ --- _- _. _._ ..._ . _
To report ngg�ng activit�es cali
1-800-424-9071
�
�
The U S Department of Transportation (USDOI� operates the above to11-free
"hoti�ne" Monday through Fnday, 8 Od a m to 5 QO p m, eastern time Anyone
w�th knowledge of passibie bid rigging, bidder collus�on or other fraudulent
activities should use the "hotline" to report such activit�es
The "hotline" is part of USDQTs continumg effort to identify and investigate
� highway construction contract fraud and abuse and �s operated under the
direction of the USD�T Inspector General Ali mfarrnation wdl be treated
confidentialiy and caller anonym�ty w�ll be respected
�
'
�
�
�
5R
Ciry of Bremerton
BVR and LFR Preservat�on Pro�ect
Contract Documents
/-7
DOT 0��2 0961 EF
Briemerton Pro�ecf No 6187
September 2013
Nan-Collus►on A�dawt
�
BIDDER'S SUBCONTRACTOR CONTACT REPORT
Please list below all mmority and other subcontractors contacted to bid on subcontract work on
this pro�ect Indicate with an asterisk (*) those firms that are at least 51 percent or more mmority
owned (This listmg does not m any way ob(igate you to contract w�th any firm on this listmg)
Name '�J i � e � � T��
Address /$/3 /3`7'�A-rJ_G C
City/State surrinJ �iP LrJAS s1.
Telephone Number ZS3- �i63 -296`7
Type of Work Bid In �TR/ �i�J('�
Results f,(S/�
Name St.cRFA-GE T�C� U�
Address /// S�J �it>� �9� Su�� /7��
City/State To�e7'��� ?>�EGQrt
Telephone Number.�p3 -.S(o8' 2377
Type of Work Bid In Fif3RE �Ei�fa��t��
Results�5✓a1.�'�
Name�i��L `� i4 U�J�
Address / 7S �Oy �oR•L� 5�
City/State �i4Ci <iG uJ�}S,�/
Telephone Number2S3-299 - /ZOt>
Type of Work Bid In �7'�� �,nJ�
Results
Name�RQ �t,l ST�S
Address �f�3S/ 3 ° �'i4tJ� N E
City/State �R� � (
Telephone Number 3(oD — t��— /d /,j
Type of Work Bid In �3��N � i,,�J('
Results G{ 5 iNG
Name �LG /�Qit,JC� � �
Address f�0 �Q1C. ��
City/State 7�iPA�N t.b�EGA�f
Telephone Number $� /- / - �BdS�
Type of Wark Bid f n �B� �E�rn
Results
Name
Address
City/State
Telephone Number
Type of Work Bid In
Results
Name of Bidder /�I�CE /v�j �
Na e o Principle Res nsible for Making Contact
A
V �
I-8
�
�
�
�
City of Breme►ton
BVR and LFR Preservat�on Pro/ect
Contract Documents
/0-�-/3
Date
Bremerion Pra�ect No 6187
September 2013
B�dder's Subcontractor Contact Report
��
�
�
�
��
�
�
�
�
�
,
�
�
�
�
�
'
l._1
�
►�J
�
- - J� v•
Subcontractor(s) with whom the bidder will directly subcoritract that are proposed to pertorm the work of heating
ventilation and air conditioning plumbing as descnbed in Chapter 18 106 RCW, and electncai as descnbed in Chapter
19 28 RCW must be listed below The work to be performed is to be listed below the subcordractor(s) name
To the exbent the ProJect includes one or more cateaorfes of work referenced in RCW 39.30.060. and no
subcontractor Is listed below to nwiorm such arork. the bidder certffies that the arork will either (jj be
r�erformed by the bidder itselP. or (i� be oerformed bv a lower tier subcontractor who will not corrtract d�rectiv
with the btdder.
Subcorttractor Name �IT.. S ys�P �
Work to be Pertormed
Subcorrtractor Name ,, f ,f�� —�O �
Work to be Performed �
Subcontractor Name
Work to be Performed
Subcontractor Name
Work to be Performed
Subcontractor Name
Work to be Pertormed
" Bidder's are notified thffi is the opmion of the enforcement agency that PVC or metal condwt �unction boxes, etc are
considered electrical eqwpment and therefore considered part of eleotncal work, even if the installation is for future use
and no winng or electrical currerrt is connected dunng the pro�ect
SR
Cdy of Bremerton
BVR and LFR Preservabon Pro�ect
Contract Documents
I-9
DOT Fartn 271 016A EF
ReNSad OB12012
Bremerton Pro�ect No 6187
September 2013
Local Agency Subcontractor L�st
�
I
performance of the work ot heating, ventilatlon and air conditioning, plumbing, as described in Chapter 18 106
RCW, and electrical, as descr(bed in Chapter 18 28 RCW or naming more than one subcontractor to pertorm
the same work will result ln your bid being non-responsive and therefore vofd
�
CERTIFICATION OF NON-SEGREGATED FACILITIES
The bidder certifies that he does not mamtain or provide for his employees any segregated
facdities at any of his establishments, and that he does not permit his employees to perform their
services at any location, under his control, where segregated facdities are maintamed The bidder
certifies further that he wdl not maintain or provide for his employees any segregated facdities at
any of his estabiishments, and that he wdl not permit his employees to perform their services at
any location under his controi where segregated facdities are maintained -The bidder agrees that
a breach of this certification wdl be a violation of the equal opportun�ty ciause m any contract
resulting from acceptance of this bid As used in this certification, the term "segregated facilities"
means any waitmg rooms, work areas, restrooms and washrooms, restaurants and other eating
areas, time clocks, locker rooms and other storage or dressing areas, parkmg lots, dnnking
fountams, recreation or entertainment areas, transportation, and housing facdities provided for
employees which are segregated by expl�cit directive or are in fact segregated on the basis of
race, color, religion, or national ongm, because of habit, local custom, or otherwise The bidder
agrees that (except where he has obtained identical certification from proposed subcontractors for
specific time periods) he wdl obtain identical certifications from proposed subcontractors prior to
the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the
equal opporturnty clause, and that he will retain such certification in his files
Note The penalty for making false statements in offers is prescribed �n 18 U S C S1001
Date
By
Title
Official Address
v
,� ' .��
� �a,�c 7Z�
(Street or P O Box)
�R7' ,¢il�'c'C�S �.QS� `j'S 36Z
(City, State, Zip)
�
�
�
�
�
�
�
�
�
��
�
�
�
�
"Must be included without alteration
C J
�
1
Ciry of Bremerton
BVR and LFR Presenrabon Pro�ect
Contract Documents
1-10
Bremerton Pro/ect No 6187 �,
September 2013
Cert�cat�on of Non-Segregated Fac�l�bes
�
�G�To,��� � , Zo /3
�
G �
�
�
�
�
�
�
�
�
�
�
�
�
,
�
�
�
CONTRACTOR'S REGISTRATION
Name L.���s�p� �,N`�v s� Sr�e
Address `� O �('�O� — i a �
�o �A-�C�,�.,�.s=. s � r� �� ��.�,'�
Employer's Identification Number
(Employer social security number, not your
personal social security number)
Employment Security Department Number
Washington Industriai Insurance Number
Washington State Excise Tax Registration
Number
q 1- O`151 l0 5`�1
��` S�'aa-- �p 3
— 1`� � �a-
1001 1C;�o $ �1`t
Washmgton State Contractor's Registration
Number/Expiration Date
City of Bremerton Business License Number
L. �.s`� �- � �-1 ��
�� �,o�t�
,
C�ty of Bremerton
BVR and LFR PrBSenrahon Pro/ect
Contract Documents
I-11
Bremerton P%/ect No 6187
September 2013
Contractors Registrahon
�
BID PROPOSAL
Belfair Valley Road and Lake Flora Road Preservation Pro�ect
Pro�ect No 6187
BID TO City of Bremerton (Washington) Department of Public Works and Utilities
1 The undersigned Bidder proposes and agrees, if this Bid �s accepted, to enter into an
Agreement with the CITY m the form inciuded in the Contract Documents to pertorm the
WORK as specified or mdicated m said Contract Documents entitled Belfa�r Valley Road
and Lake Flora Road Preservation Pro�ect
2 Bidder accepts all of the terms and conditions of the Contract Documents, including without
limitation those in the Notice Inviting Bids and Instructions to Bidders, dealing with the
disposition of the Bid security
3 This Bid will remain open for the period stated in the "Notice Inviting Bids" unless otherwise
required by law Bidder will enter into an Agreement within the time and in the manner
required in the "Notice Inviting Bids" and will furnish the msurance certificates, Payment
Bond, and Performance Bond required by the Contract Documents
4 Bidder has examined copies of all the Contract Documents mcludmg the following addenda
(receipt of all of which is hereby acknowledged)
Number � Date 10 — I—(�
a �v-3-
Fadure to acknowledge all addenda shall render the bid non-responsive and shall be cause
for its re�ection
5 Bidder has familiarized itself with the nature and extent of the Contract Documents, WORK,
site, locality where the WORK is to be perFormed, the legal requirements (federal, state and
local laws, ordinances, rules, and regulations), and the conditions affecting cost, progress or
pe►formance of the WORK and has made such independent investigations as Bidder deems
necessary
To all the foregoing, and mcluding ali Proposal Forms conta�ned in this Bid, said Bidder further
agrees to complete the WORK required under the Contract Documents within the Contract T�me
stipulated in sa�d Contract Documents, and to accept in full payment therefore the Contract
Price based on the Total Bid Price(s) named in the aforementioned Proposal Forms
NOTE Prices for all items, all extensions and total amount of bid must be shown in the
Proposal Forms Show prices m figures
Dated �/O�� � PD/��_ Bidder
By
Title
City of Bremerton
BVR and LFR Preservat�on Pro�ect I-12
Contract Documents
�lEsiac N i
(Si atur
�a��� �
8►�emerton P /ect No 6187
September 2013
B�d Proposal
PROPOSAL FORM
BELFAIR VALLEY ROAD AND LAKE FLORA ROAD PRESERVATION PROJECT
Sales Tax - The Bidder shail mclude sales tax in the Bid Item pnce per Section 1-07 2(1} for ail
items
Date � /oaf� 7 , 2013
Item Ref to Estimated Unit
No S ec Descn t�on of Item Quanti Urnt Price Amount
1 1-04 MINOR CHANGE 1 EST $15,000 $15,000
2 1-07 SPCC PLAN 1 LS ,�s0 `� �o °1
3 1-09 MOBILIZATION 1 LS /� qqp �6 oap
PROJECT TEMPORARY TRAFFIC
4 1-10 CONTROI 1 LS /�q� �/�AC�
5 2-01 ROADSIDE CLEANUP 1 FA $1 00 $1 00
6 2-11 TRIMMING AND CLEANUP 1 LS (e,9ST � qS7
7 4-04 CRUSHED SURFACING TOP COURSE 470 TON 39 � /a' 3�
FIBER REINFORCED NMA C� 1!2 !N
8 SP 5-04 PG 64-22 3,300 TON g� '� Z�7ZG
9 SP 5-04 PAVEMENT REPAtR 100 SY /�{2� /� �
10 5-04 PLANING BITUMINOUS PAVEMENT 5fi0 SY /,Z °-° �p�72D
11 8-22 PAINT LINE 78,0�0 LF , j 7 l j 2(pp
TOTAL BtD ITEMS 1-11 $,3gZ Q/$ �
END OF PROPOSAL FORM
C�ry of Bremerton Bremertan Pro�ect No 6187
BVR and LFR Preservation Pro�ect 1-13 October 1 2013
Contract Documents — Addendum No 2 Proposal Form
Local Agency Certificat�on for Federal-Aid Contracts
The prospect�ve partic�pant certifies by signing and submitting
thls bid or proposal, to the best of his or her knowledge and
belief, that
(1) No Federal appropriated funds have been paid or wdl be paid, by or on
behalf of the undersigned, to any person for influencmg or attempting to
influence an officer or employee of any Federal agency, a Member of Congress
an officer or employee of Congress, or an employee of a Member of Congress
in connection with the awardmg of any Federal corrtract, the rnakmg of any
Federal grant, the mawng of any Federal loan, the entenng into of any
cooperative agreement, and the extension continuation, renewal amendment
or modification of any Federai contract grant, loan or cooperative agreement
(2) If any funds other than Federal appropnated funds have been paid or wdl be
pa�d to any person for influencing or attempting to mfluence an officer or
employee of any Federal agency, a Member of Congress an officer or
employee of Congress or an employee of a Member of Congress in connection
with this Federal contract, grant loan, or cooperative agreement, the
undersigned shall complete and submit Standard Form-LLL, "Disclosure Form
to Report Lobbymg," in accordance with its mstructions
This certfication is material representation of the fact upon which reliance was
placed when this transaction was made or entered mto Submission of this
certification is a Qrerequisite for makmgor entenng mto this transaction imposed
by Section 1352, Title 31, U S Code Any person who fads to file the required
cert�icaUon shall be sub�ect to a Gvd penalty of not less than $10,000 and not
mo�e than $100 000 for each fadure
The pros ctrve rhaQant also agrees by submitting h�s or her bid or �r000sal
that he or she shall reqwre that the languaqe of this cert�fication be included in
all lower tier subcontracts. which exceed $100,000 and that all such
subrecipients shall certify and disclose accordingly
SR
DOT ��� Z-o40A EF
City of Bremerton Bremerton Project No 6t87
BVR and LFR PreservaGon Project I-14 September 2013
Contrad Documents Local Agency Cert�fication for Federa/ Aid Contracts
BID CERTIFICATE
STATE QF �/ � �
. } ss
COUNTY OF ��� / �
(�f Corporation)
! HEREBY CERTIFY that a meeting of the Board of Oirectors of the Lr �_ jp��+
'l7 v'�yy"� � ,,.,� �J� _
a corporat�on ex�stmg under the laws of the State of _�z�_216� �D' held on
��.1!-..�,
C1_G=� , 20,L� the followmg resolution was duly passed and adopted
"RESOLVED that
author�aed to execute
C��
��.Y/t/or' �d'!Jl��'�''
f'nss+�er�t- of this Corporation, be
8�d dated Q�- �7 , 20�,
and is he�eby
to the City of
Bn�merton by this Corporation and that his/her execution thereof, attested by the
Secretary of this Corporation and with the Corporate Seal a�xed, shall be the
offrc�al act and deed of this Corporation "
I further certdy that said resolution is now m full force and effect
IN WITNESS WHEREqF, I have hereunto set my hand and affixed the offic�al seai of the
carporatwn this �r `° ,�day of _�G�i��oa— 20/�
�
��� `� ��% /�Y
��
�5�,
, as
�ty����� ����� 6,87
BVR end GFR Pr�servatron Profecf I 15 September ZO f 3
Conlracct Documanls
Brd Ceihl'°cate
t
�
�
�
�
�
� �
�
,�
,�
��
��
�
��
��
,
l 4 �
f�
�
�
BID CERTIFICATE
(if Partnership)
STATE OF
COUNTY OF
)
) ss
)
I HEREBY CERTIFY that a meeting of the Partners of the
a partnership existing under the laws of the State of , held on
, 20 , the following resolution was duly passed and adopted
"RESOLVED, that , as General Partner of the
Partnership, be and is hereby authonzed to execute the Bid dated ,
20 , to the City of Bremerton by this Partnership and that his/her execution thereof
attested by the General Partner shall be the o�cial act and deed of th�s Partnership °
I further certify that said resolution is now m full force and effect
IN WITNESS WHEREOF, I have hereunto set my hand this , day of , 20
General Partner
(SEAL)
C►ty of Bremerton
BVR and LFR Preservat�on Pro�ect
Contract Documents
I-17
Bremerton Pro�ect No 6187
September 2013
B�d Cert�cate
BID CERTIFICATE
(if Joint Venture)
STATE (3F
COUNTY OF
)
) ss
)
I HEREBY CERTIFY that a meeting of the Principals of the
a �oint venture existing under the laws of the State of , held on
, 20 , the following resolut�on was duly passed and adopted
"RESOLVED, that , as
of the Jomt Venture, be and is hereby authorized to execute the Bid dated
, 20 , to the City of Bremerton by this Jomt Venture and that
his/her execution thereof attested by the shall be the
official act and deed of this Joint Venture "
I further certify that said resolution is now m full force and effect
IN WITNESS WHEREOF, I have hereunto set my hand this , day of , 20_
Managing Partner
(SEAL)
Gty of Bremerton Bremerton Pro�ect No 6187
BVR and LFR Preservation Pro�ect l-18 September 2013
Contract Documents B�d Cert�cate
,
�
�
�
,�
L
INFORMATION REQUIRED OF BIDDER
The Bidder shall furnish the following information Additional sheets shall be attached as
required Failure to complete these items will cause the Bid to be non-responsive and may
cause its re�ection In any event, no award will be made until all of the Bidder's General
Information is delivered to the CITY
(1) CONTRACTOR's Name and Address L��'t 1�v��V�S�1 �V�S C
� o �o� 1.�-$
� (2) CONTRACTOR's Telephone No
CONTRACTOR's Fax No
� (3) CONTRACTOR's License Primary
Classification
�
�
,
�
�
�
�
�
�
�
�
��
I
State License No and Expiration Date
Specialty Classifications Held (�f any)
Name of Licensee, if different
from (1) above
(4) Name, address, and telephone number
of surety company and agent who wdl
provide the required bonds on this
contract
(5) Name and position of person(s) who
attended the pre-bid visit to the work site
(if any)
City of Bremerton
8VR and LFR Preservatron Pro�ect
Contract Documents
�i O �C��V..� S v� �� 31Q, ra
3��- � S'a - �
3�� - � SZ - �`t 3 a
�► �'���- �0�,� � fl..�
L�c�si � a1y�� ,-3i-��{
�,�/�
�C�_rn�
�0.s�z� Sm�� � �-ee�
a'a- 33 �\a � V�v z 1�1C
^ �e.\\.e.�t� � � � q �oc�-1
gv�.��-, l.S�,�'s or, `��.s -1CFi - 31o.a5
�M..�,�2 1��.1 S
� S�. rvZG..-4c�r'
1-19
Breme►ton Pro�ect No 6187
September 2013
Informat�on Requ�red of B�dder
(6) ATTACH TO THIS BID a list of three (3) pro�ects completed by the Contractor, that are
similar to "Belfair Valley Road and Lake Flora Road Preservation Pro�ect" pro�ect in nature,
value and complexity of work The three (3) pro�ects must have been completed under the
bidder's name as the prime (general) contractor withm the last 5 years The list shall include the
following information as a minimum
• Names, address, and telephone number of owner
• Name of pro�ect
• Location of pro�ect
• Brief description of the work mvolved
• Contract amount
• Date of completion of contract
• Name, address, and telephone number of architect or engineer
• Name of owner's pro�ect engineer
• List of Ma�or Equipment
• Years in business under current name
• Contracts now m hand, gross amount
City of Bremerton Sreme►ton Pro�ect No 6187
BVR and LFR Preservat�on Pro/ect I-20 September 2013
Contract Documenfs Information Requ�red of B►dder
6) Pro�ect completed by contractor
Crty of Bambridge Island, 280 Madison Avenue North, Bambridge Island, WA 98110
206-780-3720
Madison Avenue Safety Improvement Pro�ect
Madison Avenue, Bambridge Island, WA
Roadway widening, curb and gutter, sidewalk, asphalt overlay and mmor traffic revisions
Contract Amount $244,024 50
Completion November 2012
Engmeer Chris Munter, 280 Madison Avenue North, Bambridge Island, WA 98110
206-842-2016
Washmgton State Department of Transportation, 6610 16th Street East, Suite B, Fifie, WA
98424-1568 253-365-6752
Gorst to Sherman Hill and Jackson Ave to Jct SR3—Paving
SR3 MP 34 31 to MP 50 00 and SR16 MP 4 98 to MP 29 19
Roadway improvements by pavement repa�r, plamm�g, overlay and pavmg Roadway delmeation,
ad�ustmg catch basms and monuments Guardrail and permanent sigmng
Contract Amount $2,655,867 98
Completion December 2012
Engmeer Kevm Dayton, PO Box 47360, Olympia, WA 98504-7360
253-365-6752
Washington State Department of transportation 1707 South C Street, Port Angeles, WA 98362
360-565-0620
SR19, S of West Valley Rd to S of Theater Rd—Pavmg
SR19, MP 9 50 to MP 13 99
HMA Overlay, asphalt plannmg wrth HMA mlay, pavement reap�r, centerline rumble stnps,
recessed pavement markuig, permanent sigmng, temporary and permanent markmgs and
traffic control
Contract Amount $1,199,343 15
Completion Date March 2013
Engineer Jerry Moore, 1707 South C Street, Port Angeles, WA 98363
360-565-0620
Equipment List next page
Years m Busmess 43 (Incorporated m 2008)
Gross Amount of Contracts on Hand $6,000,000 00
Equip Descnption
#
VIN
Lic # Tare Gross
Tonnage Permit
Lic Exp
Expnation Expiration
Thursday October 03 2013
11054
11056
11073
11367
11368
11422
11428
11982
12025
12026
12179
12185
12201
12422
12450
12505
12506
12507
12512
12526
12527
13016
13027
13170
14007
14101
14280
14285
14290
14291
16001
16005
16163
16170
16171
16182
17012
17013
17314
17323
17343
17345
17346
18006
18010
18013
'20006
20014
20024
20037
20039
20040
"20041
20043
20044
'20045
2002 F 150 P/U
2005 F150 P/U-Mike Thomas
2012 Ford F150 Pickup- JR
1994 F250 P/U-Arrow Truck
1994 Ford F250 P/U
1999 F250 P/U- Hurd
2001 F250 P/U - 040 Plant
1990 Chev C1 Pickup (green)
1999 F450 Svc Tk- Woody
1999 F450 Svc Tk- Munch
1994 F450-Ravagrn
1996 F450 Shop Truck - Rose
2002 Ford F450 Tool Truck-Scott
2004 F450 Flatbed Truck-Mark
1995 F450 Sign Truck
2004 F450-Shaun Dawes
2004 F450-Bret McGuire
2004 F450 Shop Truck-Johannes
2005 F450- Cousm
2008 F450-Bouse
2008 F450-LaBeile
1998 Peterblt Distnbutor - Blue
2004 Peterbdt Distnbutor
1999 Water Truck - Wh�te-
Bemis Arrow Trader
1991 HM Water Trader
1997 Amer Sgnl PCMS
2004 Addco Solar PCMS
2008 WANCO PCMS
2008 WANCO PCMS
1988 TRLMSTR Roller Trir
1988 HM Utddy Trlr-
1992 Tradking Roller Trlr- LaBelle
1996 Trailking Roller Trir
1996 Tradking Roller Trir-
1999 Tradking Tdt Trlr- 2AX
1994 Tack Trlr - AR4000
1994 Tack Trlr - CSS 1
2007 Olympic Tdt Trader-lAX-Rav
2007 Waterboy Water Trader
2011 Olympic Trader- 2AX- Davies
2012 OM1 Olympic Trader-2AX- LaBelle
2012 Olympic OM6-1E Trlr-1AX- at Shine
1999 F450 Diesel Dump 1-Ton- Kitsap
2001 F450 Dump 1-Ton
2004 F450 Dump 1-Ton
1988 Peterbilt - Ormiston
1989 Peterbtlt - Cnsafi
1990 Peterbdt - Lockhart
1991 Peterbdt -
1991 Peterbdt - Burkhardt
1991 Peterbilt -
1991 Peterbdt" - Gnbbm
1991 PeterbiR Water Trk- Dutrow
1991 Peterbdt - Ulnch
1991 Peterbdt* - Chnstensen
2FTRX17W62CA40615 644717N
1FTRX12W85KC83771 B22265X
1FTFX1CF4CFC60270
2FTHF25H9RCA39509
2FTHF25H7RCA39511
1FTNX20F5XEC89245
1FTNX20F31EC09190
1 GCDC 14Z3LE 180539
1 FDXF46F8XEA10476
1FDXF46FOXEA10469
1FDLF47GXREA09709
1FDLF47F7TEA74368
1FDXF46F72EB62810
1FDXF46P24EB73080
1FDLF47G6SEA24925
1FDXF46P64E673079
1FDXF46P64E673082
1FDXF46P44EB73078
1FDXF46P25EC20707
1 FDXW46R78EA55775
1FDXW46R98EA55776
3BPNHD7X6WF472562
2NPNHD7X04M815096
2FZHRJAA2XAB16813
8509B03
WA92163578
1A9MS1511TA378060
1A9H121002M157666
5F12S161181000604
5F12S161381000605
1G9KS1725JA065539
WA86125959
1TKU01224NM061589
1TKU01624TM014599
1TKU01627TM014600
1TKCO2427XM017166
1291357
10172A
1C9TF12117T997102
1 N9BW 14227P228155
1C9TF2027BT997342
1C9TF2026CT997284
1C9TF1216CT997283
1FDXF46F4XEA10474
1FDXF46F51EC10738
1FDXF46P24E673077
1XPFLR9X2JD259636
1XPFLR9X9KD277181
1XPFLR9X1LD291058
1XPFLR9X9MD308982
1XPFLR9X2MD308984
1XPFLR9X4MD308985
1XPFLR9X6MD308986
1XPFLR9XXMD308988
1XPFLR9X1MD308989
1XPFLR9X8MD308990
B42924V
B52559U
B52560U
680050B
B08807H
B25739F
B800526
680053B
647185G
622275X
B44722N
B52570U
B52571U
B52572U
B52573U
B52574U
B22283X
B13120D
B 13122D
A96397C
625211 W
A90418E
5907XL
0734UV
4710XZ
0172UK
0171 U K
4713XZ
5600UT
4472TU
4714XZ
4715XZ
6772NZ
5909XL
5910XL
0043TK
4405U6
6789XD
3811XL
3812XL
880071B
B88520H
B52577U
B78128V
678129V
B26346F
35741T
B31604Z
626345F
B78130V
B75158T
830086V
B78131V
4189
4904
5009
4444
4444
5668
5646
4180
8010
8700
7800
7760
8820
8060
7380
8620
8780
9220
9600
10420
10840
15480
6160�
10700
2560
1870
980
2200
2280
2280
7300
880
1500
960
1350
3100
3100
960
10180
9640
9960
22100
23440
21780
22600
22 140
22140
22800
22320
22140
22140
6000
6000
8000
8000
8000
8000
8000
6000
24000
26000
24000
18000
20000
24000
14000
24000
24000
24000
26000
24000
24000
34000
32000
30000
2950
3500
2640
2640
26000
26000
26000
98000
98000
102000
102000
98000
102000
98000
50000
102000
98000
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
72/31/13
12/31/13
12/31/13
12l31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12J31/13
PERM
12/31/13
12/31/13
12/31/13
12/31/13
11/07/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/73
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/73
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
PERM
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
11/04/13
99f28F43
�8/A3E��
nni ��o
4 4F94la-2�
11/04/13
11/25/13
11/04/13
Equip
#
`20046
'20053
20054
20064
20078
20211
20216
20217
20384
"20387
20391
20414
21000
21105
22010
23009
23013
23016
23037
23044
23048
24002
25006
26408
`26411
26415
26438
26850
"26851
26855
26856
`26861
`26863
26866
26953
26960
26977
26978
26979
26982
26989
27000
27105
27203
31124
31202
31956
31962
32007
32026
34128
34209
35158
*35162
35164
36010
40008
40203
Descnption
VIN
1991 Petefbdt -SHINE PIT TRUCK 1XPFLR9XXMD308991
1992 Peterbdt* Mendez 1XPFLR9XXND319328
1992 Peterbdt - Johannes 1XPFLR9X1ND319329
1996 Peterbdt - Moe 1XPFLR9X9TD388878
2007 Peterbdt - Medley 1NPFLBOX07D662859
2009 Peterbdt DeBray 1NPTL4EX19D777013
2014 Peterbdt Super Solo- Hull 1 NPSLPEX8ED230828
2014 Peterbilt Super Solo- Deede 1NPSLPEXXED230829
1994 Peterbdt Trsfr-Johnstad 1XPFLR9X2RD355892
1996 Peterbdt Trsfr- Gingrey-not pup w�red 1 XPFLR9X3TD388889
1996 Peterbdt Trsfr- 26415 trlr-Broderson 1XPFLR9X1TD418617
2004 Peterbdt Trsfr - Granum 1NPFLBEX44D835609
1990 Peterbdt Tractor- Wdson 1XPFDR9X4LD294274
1970 CAT 966C Loader 76J2899
1997 Tradking Lowboy Trir- truck 21000 1TKJ0523XVM017891
1990 Trlkng Tdt Top Trlr-2AX 1TKCO2422LM035844
1991 Trlkng Tdt Top Trlr-3AX 1TKCO2830MMO28637
1992 Tradking Tdt Trlr - 3AX 1TKCO2838NM120077
2004 TKT50 Tradkng Tdt - 4AX 1 TKCO34454M016021
2008 TKT50 Trad King Tdt - 4AX 1TKCO34458MO25131
2013 TK50HT Dovetad Trlr - 4AX 1TKCO3443DM041533
1992 Rd Rvr Belly Dump Trir- trk 21000 1R9BD4236N1051043
2013 Live Bottom Dump Trader - tric 21000 1 TK04555EW061754
1994 Sturdyweld Tsfr Trlr- Johnstad 1S9CA4345PL189043
1995 Sturdyweld Tsfr Trlr- Gingrey 1S9CA4347SL189060
1996 Sturdyweld Tsfr Trlr- trk 20391 Broderson 1S9CA4348TL189066
2004 Reliance Trsfr Trlr- Granum 5REFA64854SO44361
1993 Sturdyweld 3AX Trlr- Johannes 1S9CA54310L189499
1993 Sturdyweld Pony Trlr-Christensen 1S9CA543401189500
1993 Sturdyweld 3AX Trlr- 1S9CA54310L189504
1993 Sturdyweld 3AX Trlr-spare Granum 1S9CA54330L189505
1993 Sturdyweld Pony Trlr- Gnbbm 1S9CA54320L189510
1994 Sturdyweld Pony Trlr- Mendez 1S9CA5434PL189612
1995 Sturdyweld 3AX Trlr- Moe 1S9CA5439SL189704
1988 Sturdyweld 3AX Trlr- Ulnch 1S9CA5533JL189034
1989 Sturdyweld Trlr- Ormiston 1S9CA533XKL189077
1991 Sturdyweld 3AX Trlr-spare Johnstad 1S9CA5435ML189300
1991 Sturdyweld 3AX Trlr- Lockhart 1S9CA5437ML189301
1991 Sturdyweld 3AX Trlr- Burkhardt 1S9CA5439ML189302
1991 Sturdyweld Pony Trlr- Crisafi 1S9CA5434ML189305
1991 Sturdyweld 3AX Trlr- 1S9CA5432ML189366
1965 Trlmble Tack Trir-Upper Pit 650277
2006 Sturdyweld 4AX Trlr- Medley 5RETE04867S076468
2008CBMPupTrader-DeBray 1B9AD16328C003970
2001 JD 410G Backhoe 763436
2007 Cat 420E 4ECN Backhoe OHLSO4704
2002 CAT 315L Excavator CJC00705
Cat 312C L Excavator CBA03072
1989 Rosco Hydraswp Broom 30997
2011 Broce KR 350 Broom 407224
1989 JD 5706 Grader DW570BX518618
2008 M413XT-1 Grader (Gator) 200-H�3MZP4Y4-02200
1990 CAT 980C Loader 63X08966
1994 Cat 980F Loader- SHINE 8CJ01536
1997 Cat 980G Loader- PA PLANT 2KR01158
2005 CAT 248 Skid Loader SCL00690
1999 Layton HSO0B Paver H10722B8
2003 Blaw Kx PF4410 Paver 3208
Lic # Tare Gross
86565T
678132V
B75135T
624932U
B77180B
B52157G
B86970Y
686968Y
B31611Z
B78106V
B78105V
A23875U
21869R
9981LK
1656JY
8172XU
8525LZ
5856VQ
8810UJ
6843YC
5305KM
1408YH
8379YL
8242XU
8243XU
1816R0
6459X6
8173XU
0593KQ
0594KQ
8174XU
8175XU
2194LE
6458X6
4562SC
8380YL
1284TI
8345YL
4191VX
0352LU
TL79972
1293T1
6782UP
B 10477S
22140
24480
33120
23480
24900
26000
29960
29960
22440
24000
24000
24880
17405
37400
23100
8980
11200
12120
17000
16780
12960
14900
19860
14700
14700
14700
15760
9700
11200
9700
9700
10720
9700
9700
9500
9780
9700
9700
9700
9700
9700
12900
13500
17000
98000
98000
98000
102000
105500
105500
82000
82000
105500
105500
105500
105500
105500
18000
Lic Exp
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
Tonnage Permit
Expnation Expiration
12/37/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
12/31/13
„�,-..^��
11/25/13
11/25/13
10/16/13
10/23/13
11/04/13
11/25/13
10/28/13
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
PERM
B44729N 6287 8000 12/31/13 12/31/13
675177T 7300 10000 12/31/13 12/31/13
B88526H 22000 24000 12/31/13 12/31/13
Equip Description VIN
,#
40221 2011 Cat AP555E Paver OA5D00228
41185 1998 CAT AP 1055B Paver SBM00256
42555 1997 IR DD22 Roller 149203
42600 1990 IR SD70DA Roller 5278
42754 1997 CAT CB534C Roller 5HN00306
42825 1999 CAT C6224C Roller 3AL01135
42972 1999 Sakai SW350 Roller 20666
43641 1996 CAT CD634C Roller 3BR00100
45057 1995 Beuthlmg 6100 Roller 11154
45058 1995 Beuthling B100 Roller 11155
45062 1997 Beuthing B60 Roller (5/15/13) 46074
45300 1997 Hypac C350D Roller D089C6431V
45316 2003 IR SD122DX Roller-Dirt 71402
45324 2005 CAT CB224E Roller 2240076
45338 2007 CAT C6564D Roller-Versa Vibe C6D00119
45339 2007 IR CR30 Roller 5726190499
45364 2007 Dynapac CC141 Roller 60213762
45365 2012 Beuthling B100 Roller 10011662
45366 2008 Sakai GW750-2 Roller GW2-20170
45367 2011 Hamm Asphalt Rolier H1850150
48108 1993 Sakai TS600 RT Roller 10148
48951 1993 IR CR80 Roller 1696536
49015 2008 Midland Road Widener 379
52018 1999 IR Air Compressor 301185UEJ221
52030 2006 Sullair Air Compressor PE4024T061826
'52032 1986 IR P160 W-JD Air Comp-SHINE 157235
56019 1989 Mdler Welder JK659292
56055 General Electnc Welder 1883703
56062 1994 Mtller Welder KA807883
56063 Hypertherm Plazma Cutter MX70000468
56087 1996 Mdler Bobcat Welder KG121459
56111 1998 Mdler Bobcat Welder KH459819
56150 2004 Bobcat 225 Welder-Truck #12507 LE101100
57013 Barge Gen-CAT 3406 250kw / 70719 is the trader #
57026 1993 Honda Generator- E63500 3103856
*57054 Cat 3412 Generator (big)- SHINE 7A-J01312
"57055 Olympian D50P1S Gen (little)-SHINE F1866G/001
59034 Target Concrete Saw 174720
59046 Light Tower 9815029
59047 Light Tower 9815031
59048 L�ght Tower 9713859
59049 2002 Alimand Light Twr NLPR03458� 2 0485PR002
59050 2000 Allmand Light Twr- NLPR04580 0003NLOP09
59516 Nissan Forklrft JP50LP PJ029H6657
70600 1974 Orcon Contrad Flboy -Truck 21000 23ASTOR177
70679 1978 Torkl Roiler Trir TL64
70688 1974 Roadrunner Tack Trlr FECO398
70719 1968 Reid Roller Trlr - Barge site 681571
71035 1982 CAT 12G Grader 61M9773
71123 1979 CAT 950 Loader 81 J 12625
71158 1984 CAT 966D Loader 99Y3262
71159 1984 CAT 966D Loader 99y3275
71828 1980 Hobart Welder 80WS12150
71879 1984 Lincoln Welder- Truck #12�73 A1071616
71971 Plate Compactors - ALL
L�c # Tare Gross
7514TJ 2316
1336SL 1990
4310VJ 1600
5449TG 1600
4489JD 14200
7607TJ 850
4722XZ 800
4311VJ 2990
A81166F 33900 34000
30380
45136
Lic Exp
12/31/13
12/31l13
Tonnage Permit
Expnation Expiration
12/31/13
12/31/13
PERM PERM
12/31/13
12/31/13
12/31/13
12/31/13
revised Thursday October 03 2013
ADDENDUM NO. 1
To Contract Documents
For
Belfa�r Valley Road and Lake Flora Road Preservat�on Pro�ect
Page l of 2 Issued. October 1, 2013
Contents• This Addendum No 1 contains revisions to the Cover Sheet, Bid Proposat, and
Special Provisions Revisions are made by re-issu�ng a form, specification page, plan sheet, OR
by directing a change in writing All revisions are listed below, bidders are caut�oned to check
the addendum contents carefully for the presence of all listed revisions
Distrebut�on: This Addendum No 1 is distr�buted to all plan holders of record by e-mail to
e-mail addresses or facsimi(e to numbers given when documents were purchased The plan
holder will be asked to confirm recexpt when e-mailed
Intesration• The followmg changes, additions, deletions and attachments are hereby made a
part of the Contract Documents for Belfa�r Vallev Road and Lake Flora Road Preservation
Pro�ect as fully and completely as if the same were fully set forth therein
Acknowled�ment of Recerot of Addendum All prospective bidders are mstructed to
incorporate this revision into their btds and to acknowledge receypt of the Addenda in the
Proposal Fa�lure to do so may result in the Bid be�ng reJected as not responsrve
Attachments to Addendum 1 Revised Cover Sheet and Pages I-2 and I-13
REVISIONS TO CONTRACT DOCU1VdEN1'S
Item 1
Section. Cover Sheet
Descr�pt�on• Replace the original Cover Sheet wrth the attached revised Cover Sheet
Item 2
Sect�on Bidding Requirements and Contract Forms, Notice Inviting Bids, page I-2
Descr�pteon Replace the page I-2 with the attached revised page I-2
Item 3
Sechon. Bidding Requirements and Contract Forms, Local Agency Subcontractor List
Descr�pt�on. Remove WSDOT form 271-015A, Local Agency Subcontractor List (page I-9)
Item 4
Sect�on• B�ddmg Requirements and Contract Forms, Proposal Form, page I-13
Descript�on. Replace the page I-13 w�th the attached revised page I-13
ADDENDUM NO. 1
To Contract Documents
For
Belfair Valley Road and Lake Flora Road Preservat�on Pro�ect
Page 2 of 2 Issued October 1, 2013
Item• 5
Sect�on• Special Provisions, Division I— General Requirements, 1-02 6 Preparation of
Proposal
Descript�on• Immediately after "1-02 6 Preparation of Proposal" paragraph, insert the
followmg text
` Sect►on 1-02 6 is supplemented with the followmg
(August 2, 200�1 WSDOT GSP)
The fifth and s�xth paragraphs of Section 1-02 6 are deleted "
Item• 6
Sect�on: Special Provisions, Division 5— Surface Treatments and Pavements, 5-04 3(3)A
Material Transfer DeviceNehicle
Descr�ption: Immediately after 5-04 3 Construction Requirements, insert the following text
"5-04.3(3)A Mater�al Transfer Dev�ceNeh�cle
Sechon 5-04 3(3)A �s supplemented v�nth the follow►ng
(August 3, 2009 WSDOT GSP)
Section 5-04 3(3)A is deleted m its enttrety "
- --__- tO�rIZOI;
Gunnar Fndnksson, P E
Pro�ect Engineer and Manager
City of Bremerton
END OF ADDENDUM NO 1-
ADDENDUM NO. 2
To Contract Documents
For
Belfa�r Valley Road and Lake Flora Road Preservahon Pro,�ect
Page 1 of 1 Issued October 3, 2013
Contents: This Addendum No 2 contains revisions to the Bid Proposal by re-issuing the form
All revisions are listed below, bidders are cautioned to check the addendum contents carefully
for the presence of all listed revisions
Dastr�bution This Addendum No 2 is distributed to alI plan holders of record by e-mail to
e-mail addresses or facsimile to numbers given when documents were purchased The plan
holder will be asked to confirm receipt when e-mailed
InteEration The following changes, additions, deletions and attachments aze hereby made a
part of the Contract Documents for Belfair Vallev Road and Lake Flora Road Preservation
Pro�ect as fully and completely as if the same were fully set forth therein
Acknowled�ment of Receipt of Addendum: All prospective btdders are instructed to
incorporate this revision mto their bids and to acknowledge receipt of the Addenda in the
Proposal Fa�lure to do so may result in the Bid being reJected as not responsive.
Attachments to Addendam 2. Page I-13
REVISIONS TO CONTRACT DOCUMENTS
Item. 1
Secteon• Bidding Requirements and Contract Forms, Proposal Form, page I-13
Descripho��he page I-13 with the attached revised page I-13
,>
- '��:
> ���
,, „�,,..
-��.-
to � Z��t�
Gunnar Fndriksson, P E
Pro�ect Engineer and Manager
City of Bremerton
END OF ADDENDUM NO 2-
,
�
r
��
�L�
�
�
�
�
u
�
,�
,
1
LJ
�
�
TABLE OF CONTENTS
PART I- BIDDING REQUIREMENTS AND CONTRACT FORMS
NOTICE INVITING BIDS
BIDDERS CHECKLIST
PROPOSALBOND
NON-COLLUSION DECLARATION
BIDDER'S SUBCONTRACTOR CONTACT REPORT
LOCAL AGENCY SUBCONTRACTOR LIST
CERTIFICATION OF NON-SEGREGATED FACILITIES
CONTRACTOR'S REGISTRATION
BID PROPOSAL
PROPOSAL FORM
LOCAL AGENCY CERTIFICATION FOR FEDERAL-AID CONTRACTS (FEDERAL)
BID CERTIFICATE - CORPORATION
BID CERTIFICATE - LIMITED LIABILITY COMPANY
BID CERTIFICATE - PARTNERSHIP
BID CERTIFICATE - JOINT VENTURE
lNFORMATION REQUIRED OF BIDDER
CONTRACT
CONTRACT CERTIFICATE - CORPORATION
CONTRACT CERTIFICATE - LIMITED LIABILITY COMPANY
CONTRACT CERTIFICATE - PARTNERSHIP
CONTRACT CERTIFICATE - JOINT VENTURE
LOCAL AGENCY PERFORMANCE BOND
LOCAL AGENCY PAYMENT BOND
STATEMENT OF INTENT TO PAY PREVAILING WAGES, DEPARTMENT
OF LABOR AND INDUSTRIES
PART II - AMENDMENTS TO THE STANDARD SPECIFICATIONS
� C►ty of Bremerton
BVR and LFR Preservation Pro�ect
Contract Documents
!�
PAGE
I-1
I-3
I-6
I-7
I-8
I-9
I-10
I-11
I-12
I-13
I-14
I-15
I-16
I-17
I-19
I-19
I-22
I-24
I-25
I-26
I-27
I-28
i-29
I-30
Bremerton Pro�ect No 6187
September 2013
Table of Confents
�
PAGE
PART III - SPECIAL PROVISIONS
DIVISION 1- GENERAL REQUIREMENTS III-3
DIVISION 5- SURFACE TREATMENTS AND PAVEMENTS III-45
STANDARD PLANS (AUGUST 5, 2013) III-52
REQUIRED CONTRACT PROViSIONS FEDERAL-AID CONSTRUCTION
CONTRACTS
APPENDICES
A PREVAILING WAGE RATES
B CONSTRUCTION FORMS
C CONSTRUCTION DRAWINGS
C�ty of Bremerfon Bremerton Pro�ecf No 6187
BVR and LFR Preservat�on Pro�ect l-�v September 2013
Contract Documents Table of Contents
�
�
'
I PART II
AMENDMENTS TO THE STANDARD SPECIFICATIONS
�
'
�
i
�.�
'
'
�
�
�
�
�
�
,
�
�
'
;�
�
�
The following Amendments to the Standard Specifications are made a part of this contract and
' supersede any conflicting prov�sions of the Standard Specifications For informational purposes,
the date following each Amendment title indicates the implementation date of the Amendment or
the latest date of revision
'
�
u
' ATB Asphalt Treated Base
' 1 3 De�n�tions
The defirntion for "Bid Documents" is revised to read
The component parts of the proposed Contract which may include, but are not limited to, the
, Proposal Form, the proposed Contract Provisions, the proposed Contract Plans, Addenda,
and, for pro�ects with Contracting Agency subsurFace investigations, the Summary of
Geotechnical Conditions and subsurface boring logs (if any)
1
'
�
�
INTRODUCTION
The followmg Amendments and Special Provisions shall be used in conJunction with the 2012
Standard Specifications for Road, Bridge, and Murncipal Construction
AMENDMENTS TO THE STANDARD SPECIFICATIONS
Each Amendment contams all current rev�sions to the applicable section of the Standard
Specifications and may include references which do not apply to this particular pro�ect
Section 1-01, Definition and Terms
August 5, 2013
1-01 2(2) Items of Work and Units of Measurement
The followmg abbreviation m this section is deleted
The defirntion for "Superstructures" is revised to read
The part of the Structure above
0
�
3
The bottom of the grout pad for the simple and contmuous span bearing, or
The bottom of the block supporting the girder, or
Arch skewback and construction �oints at the top of vertical abutment members or
rigid frame piers
Longitudinal limits of the Superstructure extend from end to end of the Structure in accordance
, with the following criteria
�
1
From the face of end diaphragm abutting the bridge approach embankment for end
piers without expansion �oints, or
2
'
�
From the end pier expansion �omt for bridges with end pier expansion �oints
AMENDMENTS TO THE 2012 STANDARD SPECtFICATIONS BOOK Page 1
' Revised 8/27113
Superstructures include, but are not limited to, the bottom siab and webs of box girders, the
bridge deck and d�aphragms of all bridges, and the sidewalks when shown on the bridge deck
The Superstructure also includes the girders, expansion �o�nts, bearings, barrier, and radmg
attached to the Superstructure when such Superstructure components are not otherwise
covered by separate unit measured or lump sum bid items
Superstructures do not include endwalls, wingwalis, barner and railing attached to the
wingwalis, and cantilever barriers and radings unless supported by the Superstructure
Sectcon 1-02, Bid Procedures and Conditions
January 2, 2012
1-02 4(2) Subsurface information
The first two sentences in the first paragraph are revised to read
If the Contracting Agency has made subsurFace investrgation of the site of the proposed work,
the boring log data, soil sample test data, and geotechnical recommendations reports obtained
by the Contractmg Agency wdl be made available for inspection by the Bidders at the locat�on
specified in the Special Provisions The Summary of Geotechnical Conditions, as an appendix
to the Speciai Provisions, and the bor�ng logs shall be considered as part of the Contract
Section 1-03, Award and Execution of Contract
April 2, 2012 -
1-03 1(1) Tied Beds
This section's title is revised to read
1-03 1(1) Ident�cal Btd Totais
Section 1-05, Control of Work
August 6, 2012
1-05 13(1) Emergency Contact L�st
The second sentence m the first paragraph is revised to read
The list shall include, at a minimum, the Prime Contractor's Pro�ect Manager, or equivalent,
the Prime Contractor's Pro�ect Superintendent, the Erosion and Sed�ment Control (ESC) Lead
and the Traffic Control Supervisor
Sect�on 1-06, Control of Material
August 5, 2013
1-06.1(3) Aggregate Source Approval (ASA) Database
The last paragraph is revised to read the following two new paragraphs
Aggregate materials that are not approved for �ase in the ASA database rnay be sampled and
tested by the Agency, for a specified use on a pro�ect, from the source or from a processed
stockpile of the material and all cost for the sampling and testing wdl be deducted from the
Contract
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page Z
Revised 8/27/13 ,
�
�
�
'
'
� �
�
�
'
�
�
I ��
'
�
The Contractor agrees to authonze the Pro�ect Engineer to deduct the samplmg and testmg
costs from any money due or coming due to the Contractor
1-06 1(4) Fabrication Inspection Expense
The first paragraph is revised to read
In the event the Contractor elects to have items fabricated beyond 300 miles from Seattle,
Washington, the Contracting Agency wdl deduct from payment due the Contractor costs to
perform fabrication mspection on the following items
• Bridge Bearings (Cylindncal, Disc, Fabric Pad, Pin, Pendulum, Rocker, and
Sphencal)
• Cantilever Sign Structures and Sign Bridges
• Epoxy-Coated Reinforcmg Steel
• Metal Bridge Radmg and Handrad
• Modular Expansion Joints
• Pamted Piling and Casing
• Painted and Powder-Coated Luminaire and Signal Poles
• Precast Concrete Catch Basins, Manholes, Inlets, Drywelis, and Risers
• Precast Concrete Drain, PerForated Underdrain, Culvert, Storm Sewer, and Sanitary
Sewer Pipe
• Precast Concrete Three Sided Structures
• Precast Concrete Junct�on Boxes, Pull Boxes, Cable Vaults, Utility Vaults, and Box
Culverts
• Precast Concrete Traffic Barrier
• Precast Concrete Marine Pier Deck Panels
• Precast Concrete Floor Panels
• Precast Concrete Structural Earth Walls, Noise Barrier Walls, and Wall Stem Panels
• Precast Concrete Retaming Walis, includmg Lagging Panels
• Prestressed Concrete Girders and Precast Bridge Components
• Prestressed Concrete Pdes
• Seismic Retrofit Earthquake Restramers
• Soldier Piles
• Steel Bridges and Steel Bridge Components
• Steel Column Jackets
• Structural Steel for Ferry Termmals, mciuding items such as Dolphins, Wingwalls,
and Transfer Spans
• Treated Timber and Lumber 6-inch by 6-inch or larger
• Timber
• Additional items as may be determined by the Engineer
The footnote below the table is revised to read
� * An inspection day inciudes any calendar day or portion of a calendar day spent by one
inspector inspectmg, on standby, or travelmg to and from a place of fabrication An
additional cost per �nspection day wdl be assessed for each additional inspector
1 Reimbursement will be assessed at $280 00 per day for weekends and holidays for each
on site inspector in travel status, but not engaged in inspection or travel activities when
fabrication activities are not taking place
'
'
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 3
' Rewsed 8/27/13
Sect�on 1-07, Legal Relations and Respons�bilit�es to the Pub6ic
April 1, 2013
1-07 1 Laws to be Observed
The following two sentences are mserted after the first sentence m the third paragraph
In particular the Contractor's attention is drawn to the requirements of WAC 296 800 which
requires employers to provide a safe workplace More specifically WAC 296 800 11025
prohibits alcohol and narcotics from the workplace
1 9(2) Postong Not�ces
This section is revised to read
Notices and posters shall be placed m areas readily accessible to read by employees The
Contractor shall ensure the followmg are posted
1
2
3
4
6
7
8
9
EEOC - P/E-1 (revised 11/09) - Equal Employment Opporturnty is THE LAW
published by US Department of Labor Post for pro�ects with federal-aid fundmg
FHWA-1022 (revised 11/11) - NOTICE Federal-Aid Pro�ect published by Federal
Highway Administration (FHWA) Post for pro�ects with federal-aid funding
WH 1329 (revised 04/09) - Employee Rights under the Davis-Bacon Act published by
US Department of Labor Post for pro�ects with federal-aid funding
WHD 1088 (revised 07/09) - Employee Rights under the Fair Labor Standards Act
pubiished by US Department of Labor Post on all pro�ects
1
'
�
�..
C I' �
'
'
�
L1
1
5 WHD - 1420 (revised 01/09) - Employee Rights and Responsibdities under The
Famdy and Medical Leave Act published by US Department Of Labor Post on all �
pro�ects
WHD-1462 (revised 01/12) — Employee Polygraph Protection Act published by US
Department of Labor Post on all pro�ects
F416-081-909 (revised 12/12) - Job Safety and Health Law published by Washington
State Department of Labor and Industries Post on all pro�ects
F242-191-909 (revised 12/12) - Notice to Employees published by Washington State
Department of Labor and Industries Post on all pro�ects
F700-074-909 (revised 12/12) - Your Rights as a Worker in Washington State by
Washington State Department of Labor and Industries {L&I) Post on all pro�ects
10 EMS 9874 (revised 04/12) - Unemployment Benefits published by Washmgton State
Employee Security Department Post on all pro�ects
11 Post one copy of the approved "Statement of Intent to Pay Prevailing Wages" for the
Contractor, each Subcontractor, each lower tier subcontractor, and any other firm
(Supplier, Manufacturer, or Fabricator) that falls under the prov�sions of RCW 39 12
because of the definition of "Contractor" m WAC 296-127-010
12 Post one copy of the prevailing wage rates for the pro�ect
'
�
�
�
�
1
,
1
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 4
Revised 8/27/13 ,
'
�
�
,
�
1 9(5) Required Documents
Item nurnber 2 in the first paragraph is revised to read
2 A copy of an approved "Affidavit of Prevailing Wages Paid", State L&I's form number
F700-007-000 The Contracting Agency wdl not grant Comptetion untd atl approved
Affidavit of Wages paid for Contractor and all Subcontractors have been received by the
Pro�ect Engineer The Contractmg Agency wdl not release to the Contractor any funds
retained under RCW 60 28 011 until all of the "Affidavit of Prevailing Wages Paid" forms
have been approved by State L&i and a copy of all the approved forms have been
subm�tted to the Engmeer
1 Responsib�lity for Damage
The �fth paragraph is revised to read
' Pursuant to RCW 4 24 115, if such claims, suits, or actions result from the concurrent
negligence of (a) the mdemrntee or the indemnitee's agents or employees and (b) the
Contractor or the Contractor's agent or employees, the indemnity provisions provided in the
' precedmg paragraphs of this Section shall be valid and enforceable only to the extent of the
Contractor's negligence or the negligence of its agents and employees
�
��
J
�
�
�
�
�
'
�
�
�
1 15 Temporary Water Pollution/Erosion Control
The third paragraph is deleted
Section 1-08, Prosecution and Progress
April 1, 2013
1-081 Subcontracting
In the sighth paragraph, "Contracting Agency" is revised to read "WSDOT"
1-08.3(1) General Requ�rements
The following new paragraph is inserted after the first paragraph
Total float belongs to the pro�ect and shall not be for the exclusive benefit of any party
1 5 T�me for Completion
The last paragraph in this section is supplemented with the followmg
e Copies of the approved "Affidavit of Prevailing Wages Paid" for the Contractor and all
Subcontractors
1 7 Maintenance During Suspension
The second paragraph is revised to read
At no expense to the Contracting Agency, the Contractor shall provide through the
construction area safe, smooth, and unobstructed roadways and pedestnan access routes for
public use during the suspension (as required in Section 1-07 23 or the Spec�al Provisions )
Th�s may include a temporary road, alternative pedestrian access route or detour
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 5
1 Revised 8/27/13
Section 1-09, Measurement and Payment
Apr�l 1, 2013
1-09 1 Measurement of Quantitees
The followmg new sentence is inserted after the sentence ""Ton" 2,000 pounds of avoirdupois
weight"
Items of payment that have "Lump Sum" or "Force Account" in the Bid Item of Work shall have
no specific unit of ineasurement requirement
1 2(5) Measurement
The second sentence in the first paragraph is revised to read
The frequency of verification checks will be such that at least one test weekly is performed for
each scale used in weighmg contract items of Work
1 6 Force Account
In item No 3 For Equipment, the last sentence in the third sub-paragraph is revised to read
In the event that prior quotations are not obtained and the vendor is a firm independent from
the Contractor or Subcontractor, then after-the-fact quotations may be obta�ned by the
Engineer from the open market in the vicinity and the lowest such quotation may be used in
place of submitted[7invoice
Section 3-01, Production From Quarry and Pit S�tes
August 5, 2013
3-011 Descroption
In the first paragraph, "asphalt treated base" is deleted
Sect�on 3-04, Acceptance of Aggregate
August 5, 2013
3-04 3(7)D4 An Entire Lot
The last sentence is deleted
3 3(8) Price Ad�ustments for Qual�ty of Aggregate
The calculation in the first paragraph is revised to read
Aggregate Compliance Price Ad�ustment =(Composite Pay Factor —1 00)
(quantity of material) (unit bid price or Contingent Urnt Price as shown in Table 1, whichever is
higher )
3-04 5 Payment
in the second paragraph, the reference "Section 3-Q4 3(6)C " is revised to read "Section 3-04 3(8)"
In Table 1, the top finro rows are revised to read the following three new rows
�
�
�
�
�I
'
'
�
�
�
�
�
�
I ��
'
�
�
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK PaBe 6 '
Revised 8/27/13
r
�
�
'
�
�
�
�
�
In Table 1, the row containing the item "Gravel Borrow for Geosynthetic Retaining Wall" is revised
to read
9 14 4) Gravel Borrow for Structurai Earth Walls 4000 2000 $30 $60
The footnotes below the Table 1 are revised to read
1 Based on 1000 CY of Concrete
2 Price ad�ustment only appiies to the actual quantity of aggregate used in the concrete
3 Contingent unit price per S Y is $0 30
In Table 2, the first row is revised to read
9-03 l I Concrete Aggregate (all concrete aggregate -mcludmg I 2 I 2 I 2 I 10 I 20
pavement)
In Tabie 2, the row contairnng the item "Gravel Backfiil for Foundations Class A" is revised to read
9-03 12(1)A Gravel Backfill for
Foundarions Class A
In Table 2, the row containing the item "Gravel Borrow for Geosynthetic Retaining Wall" is revised
to read
' 9-03 14(4) Gravel Borrow for 2 2 5 5 5 10
Structural Earth Walls
�
�
�
�
�
�
,
��
Item 1 in the footnotes below Table 2 is revised to read
1 For Aggregate, the nominal maximum size sieve is the largest standard sieve opernng
listed m the applicable speafication upon which more than 1-percent of the material by
weight is permitted to be retamed For concrete aggregate, the nominal max�mum size
sieve is the smallest standard sieve opening through which the entire amount of
aggregate is permitted to pass
The footnotes below the Table 2 are supplemented with the following
3 Use the price ad�ustment factors for the material that is actually used
4 Resistivity 10, pH 10, Chlarides 5, and Sulfates 5
Section 4-06, Asphalt Treated Base
August 5, 2013
This section including title is deleted m its entirety and replaced with the followmg
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 7
1 Revised 8/27/13
Vacant
Section 5-01, Cement Concrete Pavement Rehabiletation
August 5, 2013
5-01.3(2)B Portland Cement Concrete
The fifth sentence in the third paragraph is revised to read
The lower Specification limit for compressive strength shall be 4,000-psi
The last two sentences in the third paragraph are deleted
5 3(4) Repface Portiand Cernent Concrete Panel
This section is supplemented with the following
Replacement panels that crack shall be repaired as specified in Section 5-05 3(22) at no cost
to the Contracting Agency Epoxy-coated dowel bars meeting the requ�rements of Section 9-
07 5(1) may be substituted for the corrosion resistant dowel bars specified
5 3(6) Dowel Bar Retrofit
The second sentence in the ninth paragraph is revised to read
The foam msert shall fit tightly around the dowel and to the bottom and edges of the slot and
extend to the top of the existing pavement surface
5 3(11) Concrete Slurry
This section mcluding title is revised to read
5-01 3(11) Concrete Slurry and Grend�ng Residue
All concrete slurry and grmdmg residue shall be removed from the pavement surFace on a
continual basis immediately behmd the grinding or cutting operations Slurry shall not be
allowed to drain mto an area open to traffic, off of the paved surFace or into any drainage
structure
The Contractor shall collect the concrete slurry and grmding residue from the pavement
surFace and dispose of it m accordance with Section 2-03 3(7)C
Opernng to traffic shail meet the requirements of Section 5-05 3(17)
Sect�on 5-02, Bituminous SurFace Treatment
August 5, 2013
In this section, "Asphalt Emulsion" is revised to read "Emulsified Asphalt"
5-02 1(1) New Construct�on
This section is revised to read
This method of treatment requires two applications of emulsif�ed asphalt and three
applications of aggregate The first application of emulsified asphalt is applied to an untreated
Roadway that is followed with an application of aggregate The second application of
emulsified asphalt is foliowed with two additional applications of aggregate
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 8
Rewsed 8/27/13 �
,
� 5-02.1(2) Seal Coats
This section is revised to read
� This method requires the placing of one appiication of emulsified asphalt and one or more
sizes of aggregate as specifled to an existmg pavement to seal and re�uvenate the surface
and to produce a uniform Roadway surtace with acceptable nonskid characteristics
�
�
�
�J
'
C �
�
�
�
�
��
'
�
�
�
5 Materials
The following new paragraph is mserted after the second paragraph
Each source of aggregate for bitummous surface treatment shall be evaluated separately for
acceptance in accordance with Section 3-04
The second and fourth paragraphs (after implementing the precedmg Amendment) are deleted
5 3(1) Equipment
The second sentence in the second paragraph is revised to read
A temperature measuring device shall be capable of reportmg the tempe�ature of emulsi�ed
asphalt in the tank
5 3(2)A New Construction
The fourth and fifth paragraphs are revised to read
Immediately before the first application of emulsified asphalt, the Roadway surface shall be m
the following condition firm and unyielding, damp, free from irregularities and matenai
segregat�on, and true to line, grade, and cross-section
No traffic wdl be allowed on the prepared surface untd the first application of emulsified asphalt
and aggregate has been completed
5 3(3) Application of Asphalt and Aggregate
The table "Application Rate" is rewsed to read
Appi�cation Rate
U�#d�luted Emulsif�ed
Asphal� Aggr�gate
(gaf per sq yd j Appiication Rate
Appi��d Ag�regate $ize (rbs per sq. yd )
New Construction
First 0 35-0 65 '/Z inch- No 4 25-45
Application or 3 / inch-% inch
Appl cat on 0 35-0 60 '/ inch- No 4 25-40
Choke Stone N/A No 4- 0 4-6
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 9
' Revised 8/27/13
Appticat�on Rate
Und�luted Emuis�fied
Asphait aggregate
(gai per sq yd ) Apptication Ra#e
Applied Aggregate S�ze (Ibs per sq. yd.)
Seal Coats
5 / mch — No 4 0 40-0 65 5 / mch- No 4 25-45
Choke Stone No 4- 0 4-6
'/z mch — No 4 0 35-0 55 %z inch- No 4 20-35
Choke Stone No 4- 0 4-6
3 / mch — No 4 0 35-0 55 3 /6 inch- No 4 20-30
Choke Stone N/A No 4- 0 4-6
The table "Pavement Sealing° is deleted
The second paragraph is revised to read
The Pro�ect Engineer will determme the application rates The second applscation of emulsif�ed
asphalt shall be applied the next day, or as approved by the Pro�ect Engmeer
The second to last paragraph is revised to read
Before application of the fog seal, all surFaces shall be thoroughly cleaned of dust, soil,
pavement grindings, and other foreign matter The fog seal emulsified asphalt shall be CSS-1
or CSS-1 h diluted with water at a rate of one part water to one part emulsified asphalt unless
otherwise approved by the Pro�ect Engineer The fog seal shall be urnformly applied to the
pavement at a diluted rate of 0 10 — 0 18 gal/sy The finished application shall be free of
streaks and bare spots
5-02 3(5) Application of Aggregates
The sixth paragraph is revised to read
The Contractor shall apply choke stone to the Roadway with additional spreading equipment
immediately following the mitial rolling of the coarse aggregate unless othen�v�se specified in
the Contract documents or specified by the Pro�ect Engineer Excess aggregate shall be
removed from the Roadway A minimum of one pass with a pneumatic roller shail be made
across the entire width of the applied choke stone
5-02 3(7) Patch�ng and Correction of Defects
The last sentence in the last paragraph is revised to read
The CSS-1 or CSS-1 h emulsified asphait may be diluted wrth water at a rate of one part water
to one part emulsified asphalt unless otherwise specified by the Pro�ect Engineer
'
�
�
�
�
�
L9
�
�
r
�
�
�
�
'
�
��
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATtONS BOOK Page 10
Revised 8/27/13 �
�
5-02 5 Payment
, The first sentence in the second paragraph is revised to read
The unit Contract pnce per mde for "Processing and Fmishing" shall be full pay for all cost to
� perform the specified work mcluding, blading, scarifying, processing, leveling, firnshing, and
the manipulation of aggregates as required
1
LJ
The third paragraph is revised to read
"Emulsified Asphalt (__)", per ton
The fourth paragraph is revised to read
The unit Contract price per ton for "Emulsified Asphalt �)" shall be full pay for all costs
�' to perform the specified Work including furnishmg, heating, haulmg, and spreadmg the
emulsified asphalt on the Roadway
�
�
�
�
�
I_�
�
�
�
�
�
�
The sixth paragraph is revised to read
The unit Contract price per ton for "Asphalt for Fog Seal" shall be full pay for all costs to
perForm the specified Work for the fog seal
The eighth paragraph is revised to read
The urnt Contract price per cubic yard for "Aggregate from Stockpile for BST" shail be full pay
for all costs to �erForm the specified Work including loading, transporting, and placing the
material m the fmished Work
The eleventh paragraph is revised to read
The urnt Contract price per cubic yard or per ton for "Fumishing and Placing Crushed
(_� shall be fuil pay for costs to perform the specified Work mcludmg furnishing,
transporting, and placmg the material in the finished Work
The thirteenth paragraph is revised to read
The unit Contract price per hour for "Additional Brooming" shall be full pay for all costs to
perform the specified Work includmg rebrooming the Roadway
Section 5-04, Hot Wlix Asphalt
Aprtl 1, 2013
5-04 2 Materials
The following material reference is deleted from this section
Blending Sand 9-03 8(4)
The fourth paragraph is revised to read
The grade of asphalt binder shall be as required by the Contract Blending of asphalt binder
from different sources is not permitted
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 17
� Revised 8/27/73
5-04 3(7)A1 General
This section is supplemented with the followmg
The Contractor shall include the brand and type of anti-stripping additive in the mix des�gn
submittal and provide certification from the asphalt binder manufacture that the anti-stripping
additive is compatible with the crude source and formulation of asphalt binder proposed in mix
design
5 Commercial Evaluation
The second sentence m the second paragraph is deleted
5 3(10)B3 Longitudenal Jo�nt Density
The section mcluding title is revised to read
5-04 3(10)B3 Vacant
5 3(11)D General
The last sentence in the first paragraph is deleted
5 3(12)A Transverse Joints
In the second paragraph "plannmg" is revised to read "planing"
5 3(20) Ants Additive
This section is revised to read
Anti-stripping additive shall be added to the tiquid asphalt by the asphalt supplier prior to
shipment to the asphalt mixmg plant For HMA accepted by statistical and nonstatistical
evaluation the anti-stnpping additive shall be added in the amount designated in the WSDOT
mix design/anti-strip evaluation report provided by the Contracting Agency For HMA accepted
by commercial evaluation the Pro�ect Engmeer wiil determine the amount of anti-strip to be
added, paving shall not begin before the anti-strip requirements have been provided to the
Contractor
5 4 Measurement
The first sentence in the first paragraph is revised to read
HMA CI PG , HMA for CI PG , and Commerc�al HMA will beClmeasured
by the ton in accordance with Section 1-09 2, with no deduction being made for the weight of
asphalt binder, mmeral fitler, or any other component of�the mixture
The last paragraph is deleted
5 5 Payment
The bid item "Longitudinal Joint Density Price Ad�ustment", by calculation and paragraph following
bid item are deleted
Section 5-05, Cement Concrete Pavement
Augus# 5, 2013
5-05.3(1) Concrete M�x Design for Paving
The title in the table titled "Portland Cement Concrete Batch Volumes" is revised to read
Portland Cement Concrete Batch Wei hts, er cubic ard of Concrete
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 72
Revised 8/27H3 �
�
l�
�
�
�
�
�
5 3(6) Subgrade
The last paragraph in this section is deleted
Sectoon 6-02, Concrete Structures
January 7, 2013
6-02 3(2) Proport�oning Matersals
The Lean Concrete value in the column "Minimum Cemetitious Content (pounds)" in the table titled
"Cementitious Requirement for Concrete" is revised to read
**** 145
The following new note �s mserted after the note "*** No maximum specified" in the table titled
"Cementitious Requirement for Concrete"
****Maximum of 200 pounds
The paragraph following the table "Cementitious Requirements for Concrete" is revised to read
When both ground granulated blast furnace slag and fly ash are included m the concrete mix,
� the total weight of both these materials is limited to 40 percent by weight of the total
cementitious material for concrete Class 4000D and 4000A, and 50 percent by weight of the
total cementitious matenal for all other classes of concrete
�
�
�
�
�
,�
�
�
�
�
6 3(2)B Commerc�al Concrete
The second paragraph is revised to read
Where concrete Class 3000 is specif�ed for items such as, culvert headwalls, pluggmg
culverts, concrete pipe collars, pipe anchors, monument cases, Type PPB, PS, I, FB and RM
signal standards, pedestals, cabmet bases, guardrail anchors, fence post footmgs, sidewalks,
curbs, and gutters, the Contractor may use commercial concrete If commercial concrete is
used for sidewalks, curbs, and gutters, �t shall have a minimum cementitious materiaf content
of 564 pounds per cubic yard of concrete, shall be air entrained, and the tolerances of Section
6-02 3(5)C shall apply
6 3(2)D Lean Concrete
This section is revised to read
Lean concrete shall meet the cementitious requ�rements of Section 6-02 3(2) and have a
maximum water/cement ratio of 2
6 3(4)A Qualification of Concrete Supplters
The first paragraph is revised to read
Batch Plant Prequalification requires a certification by the National Ready Mix Concrete
Association (NRMCA) Information concernmg NRMCA certification may be obtamed from the
NRMCA at 900 Spring Street, Silver Springs, MD 20910 or online at www nrmca org The
NRMCA certification shall be valid for a 2-year period from the date of certificate The followmg
documentation shall be submitted to the Pro�ect Engmeer, a copy of the current NRMCA
Certificate of Conformance, the concrete mix design(s) (WSDOT Form 350-040), along with
AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Page 13
� Revised B/27H3
copies of the truck list, batch plant scale certification, admixture dispensing certification, and
volumetric water batching devices (including water meters) verification
6-02 3(5)G Sampling and Test�ng Frequency for Temperature, Consistency, and A�r
Control
The last sentence in the second paragraph is revised to read
Sampling shall be perFormed in accordance with WSDOT FOP for WAQTC TM 2 and random
samples shall be selected m accordance with WSDOT TM 716
6 Pigmented Sealer for Concrete Surfaces
This section is revised to read
The Contractor shall submit the pigmented sealer manufacturer's written instructions covermg,
at a mirnmum, the following
Surface preparation
2
3
4
5
Application methods
Requirements for concrete curmg pnor to sealer application
Temperature, humidity and precipitation limitations for application
Rate of application and number of coats to apply
The Contractor shall not begin applying p�gmented sealer to the surfaces specified to receive
the sealer untd receivmg the Engineer's approval of the submittal
All surtaces specified in the Plans to receive pigmented sealer shall receive a Class 2 surFace
finish (except that concrete barrier surFaces shall be finished m accordance with Section 6-
02 3(11)A) The Contractor shall not apply pigmented sealer from a batch greater than 12
months past the irntial date of color sample approval of that batch by the Engmeer
The pigmented sealer color or colors for specific concrete surfaces shall be as specified m the
Special Provisions
The final appearance shall be even and urnform withou
color Surface finishes deemed unacceptable by the
accordance with the manufacturer's recommendations
Contracting Agency
�
�
�
�
�
,
�
f
._�
�
�
�
�
�
�
�
t blotchmess, streaking or uneven �
Engmeer shall be re-coated in
at no additional expense to the
For concrete surFaces such as columns, retaining walls, pier walls, abutments, concrete fasaa
panels, and noise barner wall panels, the pigmented sealer shall extend to 1 foot below the
firnsh ground line, unless otherwise shown m the Plans
6 3(16) Plans gor �alsework and Formwork
item No 4 �n the seventh paragraph is revised to read
4 Conditions required by other Sections of 6-02 3(17), Falsework and Formwork
Item's No 5, 6, 7, and 8 in the seventh paragraph are deleted
��
�
�
�
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 14
Revised 8/27/13 �
�J
�
�
�
�
LJ
�
�
�
�
�
�
��
�
�
�
The following paragraph is inserted after the seventh paragraph
Plan approval can be done by the Pro�ect Engineer for footings and walls 4 to 8 feet high
(exclud�ng pedestal height) provided
Concrete placement rate is 4 feet per hour or less
2
3
4
Fac►ng is 3 /-inch plywood with grades as specified per Section 6-02 3(17)I
Studs, with plywood face grain perpendicular, are 2 by 4's spaced at 12 inches
Walers with 3,000 pound safe working load ties spaced at 24 inches are two 2 by 4's
spaced at 24 inches
6 3(17)F Brac�ng
In the first paragraph, the phrase "per Section 6-02 3(17)I" is revised to read "in accordance with
Section 6-02 3(17)I"
This section is supplemented with the followmg new sub-section
6-02 3(17)F5 Temporary Bracing for Bridge G�rders During Diaphragm and Bridge Deck
Concrete Placement
Prestressed concrete girders shall be braced to resist forces that would cause rotation or
torsion in the girders caused by the plac�ng of precast concrete deck panels and concrete for
the bridge deck
Bracing shall be designed and detaded by the Contractor and shall be shown in the
falsework/formwork plans submitted to the Engineer for approval These braces shall be
furnished, installed, and removed by the Contractor at no additional cost to the Contracting
Agency The Contractor may consider the bracing effects of the diaphragms in developing the
falsework/formwork plans The Contractor shall account for the added load from concrete
finishing mach�nes and other construction loadings m the design of the bracmg
Falsework support brackets and braces shall not be weldcd to structurai steel bridge members
or to steei reinforang bars
6 3(17)F4 Temporary Brac�ng for Bridge Girders
This section mcluding title is revised to read
6-02 3(17)F4 Temporary Bracing for Bredge G�rders Durmg Erection
Steel girders shall be braced in accordance with Section 6-03 3(7)A
Prestressed concrete girders shall be braced sequentially during girder erection The bracing
shall be designed and detailed by the Contractor and shall be shown in the
falsework/formwork plans submitted to the Engineer for approvat The Contractor shall
furnish, mstall, and remove the bracmg at no additional cost to the Contracting Agency
At a minimum, the Contractor shall brace girders at each end and at midspan to prevent laterai
� movement or rotation This bracing shall be placed prior to the release of each girder from the
erection equipment If the br�dge is constructed with cast-�n-place concrete diaphragms, the
�
� AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 15
Revised 8/27/13
bracing may be removed once the concrete �n the d�aphragms has been placed and cured for
a mirnmum of 24 hours
6 3(17)H Formwork Accessories
The first paragraph is deleted and replaced with the followmg two new paragraphs
Formwork accessories such as form ties, form anchors, form hangers, anchormg inserts, and
simdar hardware shall be specifically identified in the formwork plans includmg the name and
size of the hardware, manufacturer, safe working load, and factor of safety The grade of steel
shail also be indicated for threaded rods, coil rods, and similar hardware W�re form ties shal!
not be used Welding or clamping formwork accessones to Contract Plan reinforcing steel will
not be allowed Driven types of anchorages for fastening forms or form supports to concrete,
and Contractor fabricated "J" hooks shall not be used Field drdling of holes �n prestressed
girders is not allowed
Taper ties may be used provided the foliowing conditions are met
The structure is not designed to resist water pressure (pontoons, floating dolphins,
detention vaults, etc )
2 After the taper tie is removed, plugs designed and intended for pluggmg taper tie
holes shall be mstalled at each face of concrete The plug shall be mstalled a
minimum of 1'/" clear from the face of concrete
3
4
After the plug is installed, the hole shall be cleaned of all grease, contammation and
foreign matter
Holes on the exposed faces of concrete shall be patched and finished to match the
surroundmg concrete
6 3(25)N Prestressed Concrete Girder Erection
The third sentence in the fifth paragraph is revised to read
The girders shall be braced in accordance with Sections 6-02 3(17)F4 and 6-02 3(17)F5
6 3(26)E5 Leak Tightness Testing
The first sentence in the first paragraph is revised to read
The Contractor shall test each completed duct assembly for leak tightness after placing
concrete but prior to placmg post tensioning remforcement
The second paragraph is revised to read
Prior to testing, all grout caps shall be installed and all vents, grout in�ection ports, and drains
shall either be capped or have their shut-off valves closed The Contractor shall pressurize the
completed duct assembly to an irntial air pressure of 50 psi This pressure shall be held for five
minu#es to allow for internal ad�ustments withm the assembly After five minutes, the air supply
valve shall be closed The Contractor shall monitor and measure the pressure maintamed
withm the closed assembly, and any subsequent loss of pressure, over a period of one mmute
followmg the closure of the a�r supply valve The maximum pressure loss for duct assemblies
equal to or less than 150 feet in length shall be 25 psig The maximum pressure loss for duct
assemblies greater than 150 feet �n length shall be 15 psig If the pressure loss exceeds the
allowable, locations of leakage shall be identified, repaired or reconstructed using methods
approved by the Eng�neer The repaired system shail then be retested The cycle of testing,
repair and retestmg of each completed duct assembly shall continue until the completed duct
assembly completes a test w�th pressure loss within the specified amount
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 16 �
Revised 8/27/13
�
�
'
�
�
�
�
Section 6-03, Steel Structures
August 5, 2013
6-03 3(7)A Erection Methods
The following new paragraph is mserted after the second paragraph
The Contractor may submit for approval the use of an engineered and fabricated lifting bracket
bolted to the girder top flanges providing the following requirements are satisfied
2
3
The lifting bracket shall be engineered and supporting calculations shall be submitted
with the erection plan,
The calculations shall include critical stresses in the girder includ�ng local stresses in
the flanges at lifting bracket locations,
The calculations shall mclude computation of the liftmg bracket and associated bolt
hole locations and the expected orientation of the girder during picking operation,
4 The lifting bracket shall be load tested and certified for a load at least 2 times the
� working load and at all angles it wdl be used (angle of load or rigg�ng) Certification
documentation from a previous pro�ect may be submitted for approval,
� 5 Bolt holes in girders added for the lifting bracket connections shall be shown in the
� shop plans and shall be drdled in the shop Field drilling of bolt holes for lifting
brackets wiil not be permitted,
�
� +J
LJ
�
�
LJ�
�
�
�
6 Boit holes in girder top flanges shall be filled with high strength bolts after erection in
accordance with Section 6-02 3(17)K
The last sentence in the fourth paragraph (after implementmg the preceding Amendment) is
revised to read
The plan, including lifting bracket working drawings and calculations, shall be prepared by (or
under the direct supervision ofl a Professional Engineer, licensed under Title 18 RCW, State of
Washington, in the branch of Civd or Structural, and shall carry the engineer's seal and
signature, in accordance with Section 6-02 3(16)
6 3(13) Fabrocatong Tension Members
Item number 2 is revised to read
2 Fabricated from plate stock with the primary rolimg direction of the stock parallel to the
length of the member, or as shown m the Plans
6 Method of Shop Assembly
The first sentence in Item 2 C �s revised to read
For Trusses and Girders — After the first stage has been completed, each subsequent stage
shall be assembled to include at least one truss panel or girder shop section of the previous
stage and two or more truss panels or girder shop sections added at the advancing end
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 17
� Revised 8/27/13
6-03 3(32) Assemblong and Bolting
The first sentence in the fourth paragraph is revised to read
To complete a �oint followmg one of the methods listed above, the Contractor shall fill all
remaming holes of the f�eld connection or splice place with bolts and tighten to snug-tight
The following two new paragraphs are inserted after the fourth paragraph
The Contractor shall complete the �oint or connection withm ten calendar days of installing the
first boit or within a duration approved by the Engineer Any bolts mserted m an incomplete
connection, either loose or tightened snug-tight, which exceed the specified duration for
completing the connection, shall be sub�ect to the following requirements
Three assemblies for each size and length shall be removed from connection(s) that
are to be tensioned Rotational capacity tests shall be performed on the removed
assemblies to demonstrate the assembly has sufficient lubricant to be tensioned
satisfactorily
�
�
'
�
�
�
2 Five assemblies shall be removed from the connection to establish the inspection �
torque
3 In the case of tension controlled bolts, three assemblies shall be removed and tested
in accordance with Section 6-03 3(33)A to verify the minimum specified tens�on can
be achieved prior to shearing of the spline
Assemblies removed for the purpose of rotational capacity testmg, determmation of the
inspection torques, or veri�cation of tension controlled bolt perFormance shall be replaced with
new bolts at no additional expense to the Contractmg Agency To mmimize the number of
removed assemblies, the Contractor may combine rotational capacity testmg and inspection
torque determination as approved by the Engmeer
6 3(33) Bolted Connections
The fourth paragraph is revised to read
All bolted connections are slip critical Painted structures require either Type 1 or Type 3 bolts
Unpainted structures reqwre Type 3 bolts Bolts shall not be galvanized unless specified in the
Contract documents AASHTO M 253 bolts shall not be galvanized and shall not be used m
contact with gatvanized metal
In the tenth paragraph, the first paragraph of Item number 3 is revised to read
3 Twist Off Type Tension Control Structural Bolt/Nut/Washer Assembly Method
(Tension Control Bolt Assembly) - Tens�on control boit assemblies shall mclude the
bolt, nut, and washer(s) packaged and shipped as a single assembly Unless
otherwise approved by the Engineer, tension control bolt assembly components shall
not be mterchanged for testmg or mstallation and shall comply with all pravisions of
ASTM F 1852 If approved by the Engineer, the tension control bolt assembly
components may be mterchanged withm the same component lot for girder web
splices or other locations where access to both sides of the connection is restricted
LJ
��
�
�
��
�
,�
�'
�
�
�-
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 18
Revised 8/27/13 �
�
�
�
�
�
�
�
6 Pre Testing
The followmg new paragraph is inserted after the fourth paragraph
Three twist off-type tension controlled bolt assemblies, per assembly lot, shall be tested in a
bolt tension calibrator The bolts shall first be tens�oned to a snug tight condition Tensioning
shall then be completed by tighternng the assembly nut m a continuous operation using a
spline drive installation tool until the spline shears from the bolt The bolt assembly tension
shall meet the requirements of Table 1 If any specimen fads, the assembly lot is re�ected
6 3(33)B Bolting Inspection
The first paragraph is revised to read
The Contractor, m the presence of the Pro�ect Engmeer, shall inspect the tightened bolt using
a calibrated inspection torque wrench, regardless of bolting method The Contractor shall
supply the inspection torque wrench Inspection shall be perFormed within seven calendar
days from the completion of each bolted connection or as approved by the Pro�ect Engineer
6 3(36) Setteng and Grouting Masonry Plates
Item number 2 �n the second paragraph is revised to read
� 2 Place steel shims under the masonry plates to position pin centers or beanngs to line and
grade and in relationship to each other Steel shims shall be the size and be placed at the
locations shown in the Plans,
�' 6 3(39) Sw�nging the Span
The second and third paragraphs are revised to read
�
l�
�
�
�
�
�
�
��
��
Y
After the falsework is released (spans swung free), the masonry plates, shoes, and keeper
plates are grouted, and before any load is applied, the Contractor (or the Engineer �f the
Contracting Agency is responsible for surveying) shall survey elevations' at the tenth points
along the centerline on top of all girders and floorbeams The Contractor shall calculate the
theoretical top of girder or floorbeam flange elevat�ons and compare the calculated elevations
to the surveyed elevations The theoretical pad or haunch depth shown in the Plans shall be
mcreased or decreased by the difference between the theoretical and surveyed top of girder or
floorbeam elevations The soffit (deck formwork) shali be set based on the Pian bridge deck
thickness and the ad�usted pad or haunch depth
The Contractor shall submit all sunrey data and calculations to the Engineer for review ten
working days prior to piacing any load, beyond the maximum five pounds per square foot of
form weight allowed, on the Structure
Secteon 6-05, Piling
August 6, 2012
6-05 5 Payment
The paragraph following the bid item, "Driving St Pile", per each is revised to read
The urnt Contract price per each for "Driving (type) Pde �)" shall be full pay for driving the
pde to the ultimate bearing and/or penetration specified
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 19
� Revised 8/27/13
Section 6-06, Bridge Railings
August 6, 2012
6-06 3(Z) Metal Ratlings
The third paragraph is revised to read
Anchor bolts shali be positioned with a template to ensure that bolts match the hole spacing of
the bottom channeis or anchorage plates
Section 6-07, Painting
August 5, 2013
6-07 3(9)A Paint System
The first sentence in the second paragraph �s revised to read
All paint coating components of the selected pamt system shall be produced by the same
manufacturer
6 3(10)H Paint System
The first and second sentences �n the second paragraph are revised to read
All paint coating components of the selected paint system shall be produced by the same
manufacturer
6 3(10)N Field Coating Applocation Methods
The first sentence is revised to read
The Contractor shali apply paint materials in accordance with the manufacturer's
recommendations by air or airless spray, brush, roller, or any combmation of these methods
uniess otherwise speafied
The third sentence is revised to read
The Contractor shall use brushes to apply the stripe coat, to ensure complete coverage
around structural geometric irregular�ties, and to push the paint into gaps between existmg
steel surfaces and around rivets and bolts
6 3(10)O Applying Feeld Coatings
The first sentence in the sixth paragraph is rewsed to read
All steel surfaces cleaned to bare metal by abrasive blast clearnng shall receive the primer
coat within the same working day as the cleaning to bare metal and before any rust begins to
form
6-07 5 Payment
The third paragraph is revised to read
The lump sum Contract price for "Clearnng and Pamting - " shall be full pay for the Work
as specified, includmg developing all submittals, arrangmg for and accommodating contact
and on-site attendance by the paint manufacturer's technical representative, furnishmg and
placing all necessary staging and rigging, furrnshing, operating and mooring barges, furnishing
AMENDMENTS TO THE 2012 STANDARD SPECIFlCAT10NS BOOK Page 20
Revised 8/27/13 �
�
and operatmg �xed and movable work platforms, accommodating Contracting Agency
� inspection access, conductmg the Contractor's quality control inspect�on program, providing
material, labor, tools, and equipment, furnishing containers for containment waste, collecting
and stonng containment waste, collecting, storing, testing, and disposing of all contamment
� waste not conformmg to the definition in Section 6-07 3{10)F, performing all cleaning and
preparation of surfaces to be painted, applying all coats of paint and sealant, correctmg
coating deficiencies, completing coating repairs, and completing pro�ect site cleanup
� The first sentence in the fourth paragraph is revised to read
Progress payments for "Cleaning and Pamting - " will be made on a monthly basis and
� will be based on the percentage of the total estimated area satisfactorily cleaned and coated
as determined by the Pro�ect Engmeer
�.J
�
Section 6-10, Concrete Barr�er
August 5, 2013
6-10.3 Construction Requ�rements
This section is supplemented with the following
� Steel welded wire reinforcement deformed, conforming to Section 9-07 7, may be substituted
in concrete barrier in place of deformed steel bars conforming to Section 9-07 2, sub�ect to the
following conditions
�
�
�
�
�
�
�
�
�
�
2
3
Steel welded wire remforcement spacing shall be the same as the deformed steel bar
spacing as shown m the Standard Plans
The minimum cross sectional area for steel welded wire reinforcement shall be no
less than 86 percent of the cross sectional area for the deformed steel bars bemg
substituted
Development lengths and splice lengths shall conform to requirements specified m
the AASHTO LRFD Bridge Design Specif�cations, current edition
6 3(6) Plac�ng Concrete Barriers
The first and second sentences in the first paragraph are rev�sed to read
Precast concrete barrier Types 2 and 4, precast single slope barrier, and transitions shall rest
on a paved foundation shaped to a uniform grade and section The foundation surFace for
precast concrete barrier Types 2 and 4, precast single slope barrier, and transitions shall meet
this test for uniformity
6 5 Payment
In the second paragraph, the bid item °Conc Class 4000" is revised to read
"Conc Class 4000
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 21
� Revlsed 8/2T/13
Sect�on 6-12, Noise Barrier Walis
August 6, 2012
6-12 3(3) Shaft Construction
The third sentence m the fifth paragraph is revised to read
When efforts to advance past the obstruction to the design shaft t�p elevation result m the rate
of advance of the shaft drdlmg equipment being sigrnficantly reduced relative to the rate of
advance for the rest of the shaft excavation, then the Contractor shall remove the obstruction
under the provisions of Section 6-12 5
6 3(6) Precast Concrete Panel Fabrication and Erection
The second sentence in item number 3 is deleted
6 Payment
This section is suppiemented with the following
"Removmg Noise Barrier Wall Shaft Obstructions", estimated
Payment for removing obstructions, as defined in Section 6-12 3(3), wdl be made for the
changes in shaft construction methods necessary to remove the obstruction The Contractor
and the Engineer shall evaluate the effort made and reach agreement on the equipment and
empioyees utilized, and the number of hours involved for each Once these cost items and
their duration have been agreed upon, the payment amount will be determmed using the rate
and markup methods specified m Section 1-09 6 For the purpose of providing a common
proposal for all bidders, the Contractmg Agency has entered an amount for the item
"Removing Noise Barrier Wall Shaft Obstructions" in the bid proposal to become a part of the
total bid by the Contractor
if the shaft construction equipment is idled as a result of the obstruction removal work and
cannot be reasonably reassigned within the pro�ect, then standby payment for the idled
equipment will be added to #he payment calculations If labor is idled as a result of the
obstruction removal work and cannot be reasonably reassigned withm the pro�ect, then all
labor costs resultmg from Contractor labor agreements and established Contractor policies will
be added to the payment calculations
The Contractor shall perform the amount of obstruction work estimated by the Contracting
Agency within the onginal time of the contract The Engmeer wdl consider a t�me ad�ustment
and additional compensation for costs related to the extended duration of the shaft
construction operations, provided
the doilar amount estimated by the Contracting Agency has been exceeded, and,
2 the Contractor shows that the obstruction removal work represents a delay to the
completion of the pro�ect based on the current progress schedule provided in
accordance with Section 1-08 3
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 22
Revised 8/27/13 �
i
i�
�;
� i��
� ��
f ��
I�
� ��
Section 6-13, Structural Earth Walis
April 1, 2013
5-13 2 Materials
In the first paragraph, the followmg item is mserted after the item "Aggregates for Portland Cement
Concrete"
Gravel Borrow for Structural Earth Walls 9-03 14(4)
6 4 Measurement
In the second paragraph, "Backfill" is revised to read "Gravel borrow"
6 5 Payment
In this section, the b�d item "Backfill for Structural Earth Wall Incl Haul" is revised to read
"Gravel Borrow for Structural Earth Wall incl Haul"
Section 6-14, Geosynthetic Retaining Walis
April 1, 2013
6-14 2 Materials
The first paragraph is revised to read
Materials shall meet the requirements of the following sections
I I�
r�
i,_,��
l :
�
J
Portland Cement
Aggregates for Portland Cement Concrete
Sand
Gravel Borrow for Structural Earth Wall
Polyurethane Sealant
Closed Cell Foam Backer Rod
Anchor Rods and Associated Nuts, Washers, and Couplers
Reinforang Steel
Wire Mesh for Concrete Reinforcement
Grout
Construction Geosynthetic
�
9-01
9-03 1
9-03 13(1)
9-03 14(4)
9-04 2(3)
9-04 2(3)A
9-06 5(1)
9-07
9-07 7
9-20 3(4)
9-33
6 4 Measurement
In the second paragraph, "geosynthetic retairnng wall backfill" is revised to read "structural earth
wall backfill"
6 5 Payment
In this section, the bid item "Gravel Borrow for Geosynthetic Ret Wall Incl Haul" Is revised to
read
"Gravel Borrow for Structural Earth Wall incl Haul"
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 23
� � Revised 8/27/13
the ground-Ime at the disposal site is at least 5 feet above the current water table,
and that disposal operations conform to the temporary erosion and sedimentation
control (TESC) requirements established for this pro�ect For the purposes of water
slurry disposal, upland is defined as an area that has no chance of discharging
directly to waters of the State, mcluding wetlands or conveyances that indirectly lead
to wetlands or waters of the State Spoils in contact with this slurry may be disposed
of as clean fill
2 Synthetic slurry and water slurry with polymer-based additives shall be contained and
disposed of by the Contractor at an approved facdity The Contractor shall acquire all
permits or approvals necessary for disposal of the slurry and shall provide copies to
the Engmeer Spoils in contact with synthetic slurry or water slurry with polymer-
based additives shall be disposed of in accordance with Section 2-03 3(7)C With
approval of the Engineer, the Contractor may re-use these spods on-site
3 Mmeral slurry may be infiltrated to a temporary sediment trap located in an upland
area within the confines of the Contracting Agency Right of Way for the pro�ect
Infdtration is allowed provided the ground-line at the d�sposal site is at least 5 feet
above the current water table, and that disposal operations conform to the temporary
erosion and sedimentation control (TESC) requirements established for this pro�ect
For the purposes of mineral slurry disposal, upland is defined as an area that has no
chance of dischargmg directly to waters of the State, including wetlands or
conveyances that indirectly lead to wetlands or waters of the State Spoils m contact
with mineral slurry shall be disposed of m accordance with Section 2-03 3(7)C With
approvai of the Engmeer, the Contractor may re-use these spods on-site
Section 7-02, Culverts
August 6, 2012
7-02 2 Materials
Note 3 m the table titled, "Culvert Pipe Schedules" is revised to read
3 Polypropylene pipe, 12 inch to 30 mch diameters approved for Schedule A and Schedule B,
36 mch to 60 inch diameters approved for Schedule A only
7 5
The bid item "Steel Rib Remforced Polyethylene Culvert Pipe In Diam ", per linear foot is
revised to read
"St Rib Remf Polyethylene Culv Pipe In Diam ", per Imear foot
Sectaon 7-03, Structural Plate Pipe, Pipe Arch, Arch, and Underpass
August 6, 2012
7-03 3(1) Foundations, General
This section is supplemented with the following
When aluminum pipe or pipe arch is in contact with cement concrete, two coats of paint shall
be applied in accordance w�th Section 7-08 3(2)D
1�
il �
�� �
I_�
i �-�
��
; Z,
��
Il�
� '{ Y
,
l4_1
Ili
I{�
l��
<<,
�� �
il l
��
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 28
Revised 8/27/13 y
i�
��
!�
�
�i
I�
��
i ��
r� 1�
�
ij
1 ��
��
I;
)��
�
��
��
!� �
I�
7 3(5) Headwalls
This section is supplemented with the followmg
When aluminum pipe or pipe arch is in contact with cement concrete, two coats of pamt shall
be applied in accordance with Section 7-08 3(2)D
Section 7-04, Storm Sewers
August 6, 2012
7-04 3(1)6 Exfiltration Test — Storm Sewers
The fifth column title "PE is revised to read "PP from the table titled, "Storm Sewer Pipe
Schedules"
Note 4 m the table titled, "Storm Sewer Pipe Schedules" is revised to read
4 PP = Polypropylene Pipe, 12 mch to 30 inch approved for Schedule A and Schedule B, 36
inch to 60 inch diameters approved for Schedule A only
7 5
The bid item "Steel Rib Reinforced Polyethylene Storm Sewer Pipe In Diam", per linear foot
is revised to read
"St Rib Reinf Polyethylene Storm Sewer Pipe In Diam", per linear foot
Secteon 7-05, Manholes, tnlets, Catch Basins, and Drywells
April 2, 2012
7-05.3 Construction 92equirements
The third paragraph is supplemented with the following
Leveling and ad�ustment devices that da not modify the structural integrity of the metal frame,
grate or cover, and do not void the origmating foundry's compliance to these specifications and
warranty is allowed Approved leveling devices are listed in the Qualified Products List
Leveling and ad�usting devices that interfere with the backfilling, backfill density, groutmg and
asphalt density will not be allowed The hardware for leveling and ad�usting devices shall be
cornpletely removed when specified by the Pro�ect Eng�neer
Section 7-08, General P�pe Installation Requirements
August 6, 2012
7-08 3(2)D Pipe Laying — Steel or Alum�num
The following new sentence is inserted after the first sentence m the second paragraph
The paint shall cover ail the surface in contact with the concrete and extend one inch beyond
the pomt of contact
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 29
�� Revised 8/27/13
Plast�c Covering
Erosion Control - Plastic coverings used to temporarily cover stock pded materials,
slopes or bare soils shall be mstalled and maintained m a way that prevents water from
intruding under the plastic and prevents the plastic cover from blowing open in the wind
Piastic coverings shall be placed with at least a 12-inch overlap of all seams and be a
mmimum of 6 mils thick
Containment - Plastic covenngs used to line concrete washout areas, contain
wastewaters, or used in secondary containment to prevent spols, shall be seamless to
prevent mfiltration and be a minimum of 10 mds thick
Vegetation Management
shall be clear and where
mmimum of 4 mils thick
8 3(6) Check Dams
This section is revised to read
(�
��
�� 1
��
- Piastic covering placed over areas that have been seeded
vegetative growth is to inhibited it shall be black and be a ��
Check dams are used as an erosion and sediment control device in channels or conveyance
areas Check dams shall be instailed as soon as construction will allow, or when designated
by the ProJect Engineer The Contractor may substitute a different check dam materiai, in lieu
of what is specified in the contract, with approval of the Pro�ect Engineer Check dam materials
shall meet the requirements m Section 9-14 5(4) Straw bales shail not be used as check
dams The check dam is a temporary or permanent structure, budt across a minor channel
placed perpendicular to the flow of water Water shall not flow freely through the check dam
structure Check dams shall be constructed in a manner that creates a pondmg area upstream
of the dam to ailow pollutants to settle, with water from increased flows channeled over a
spiilway in the check dam The check dam shall be constructed to prevent erosion in the area
below the spillway The outer edges shall extend up the sides of the conveyance to prevent
water from gomg around the check dam Check dams shall be of sufficient height to maximize
detention, without causing water to leave the ditch
Wattles, coir logs and compost sock used as check dams shall not be trenched in and shall be
mstalled as shown m the Standard Plans
When wattles, coir logs, and compost socks are used as check dams they shall be measured
and paid as check dam in accordance with Section 8-01 4 and 8-01 5
8 3(6)A Geotextile Check Dam
This sections content including title is deleted
8 3(6)B Quarry Spall Check Dam
This sections content including title is deleted
8 3(6)C Sandbag Check Dam
This sections content mcluding title is deleted
8 3(6)D Wattle Check Dam
This sections content includmg titie is deleted
8-01 3(6)E Coor Log
This section including title and section number is revised to read
��
�
��
��
E.�'
El
��
L�
�
��
L�
��
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 32
Rewsed 8/27/73 ��
�
� 8-01 3(6)A Coor Log
Coir logs are used as erosion and sediment control or bank stabdizing device Coir logs shall
be laid out, spaced, staked and installed in accordance with the Standard Plans
�
�
�
�
�
LJ
�
rl
� _ ��
�
Live stakes �n accordance with Section 9-14 6(1) can be used in addition to, but not as a
replacement for, wooden stakes
8-01.3(7) Stabilozed Construction Entrance
The first paragraph is revised to read
Temporary stabdized construction entrance shail be constructed in accordance with the
Standard Plans, pnor to beginning any clearing, grubbing, embankment or excavation Ail
quarry spall matenal used for stabilized construction entrance shall be free of extraneous
materials that may cause or contribute to track out
8 3(9)A Silt Fence
This sect�on and all sub-sections mciuding title is revised to read
8-01.3(9)A Fencing
8-01 3(9)A1 High Visibd�ty Fencing
High visibility fencing (HVF) shall be orange m color and installed along the site
preservation lines shown in the Plans or as specified by the Engineer Post spacing and
attachment of the fencing material to the posts shall be as shown m the Standard Plans
and in accordance with Section 9-14 5(8) The HVF shall not be fastened to trees
8-01 3(9)A2 Silt Fence
Silt fence shail be black in color and used as a sediment control device to prevent
sed�ment laden water from leaving proJect boundaries, to manage stormwater within the
site, or to create small detention areas Silt fence shall be installed at locations shown m
the Plans The geotextile shall be securely attached to the posts and support system
Post spacmg and attachments shall be as shown in Standard Plans
Geotextde material shall meet the requirements of Section 9-33 2(1), Table 6 and be sewn
� together at the point of manufacture, or at a location approved by the Engineer, to form
geotextde lengths as required All sewn seams and overlaps shall be located at a support
post
�
�
Posts shail be either wood or steel Wood posts shall have mirnmum dimensions of 1'/ by
1'/ inches by the minimum length shown m the Plans
When sediment deposits reach approximately '/ the height of the silt fence, the deposits
shall be removed and stabil�zed in accordance with Section 8-01 3(15)
� If trenching is not feasible due to rocky sods or not advisable due to proximity to a
downslope sensitive area, a different sediment control device that does not require
trenchmg shall be used m place of silt fence
� Silt Fence w�th Backup Support
Where backup support is needed for silt fence in areas where extra strength may be
� required, such as the toe of steep cut or fdl slopes or areas where equipment may push
excessive soils toward the fence When backup support is used, wire shall have a
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 33
� Rev�sed 8/27/13
maximum mesh spacmg of 2 inches, and the plastic mesh shall be as resistant to
ultraviolet radiation as❑theClgeotextile it supports The strength of the wire or plastic
mesh shall be equivalent to or greater than as required m Section 9-33 2(1), Table 6, for
unsupported geotextile (i e, 180 Ibs grab tensile strength in the machme direction) Post
spaang and attachments shall be as shown m Standard Plans
8-01 3(9)A3 High Visibdity Silt Fence
High v�sibdity sdt fence (HVSF) shall be orange m color and oniy be used for the dual
purpose of demarcating site preservation lines and a sediment control device in a location
where high visibdity mesh fence and black silt fence would otherwise be used together at
same location If use of HVSF is allowed the geotextde material shall meet the material
requirements of Section 9-33 2(1), Table 6 Post spacing and attachments shall be as
shown m Standard Plans
H�gh Visibility Silt Fence w�th Backup Support
Where backup support is needed for high visibility silt fence (HVSF) in areas where extra
strength may be requ�red, such as the toe of steep cut or fill slopes or areas where
equipment may push excessive soils toward the sensitive or protected areas When
backup support is used, wire shall have a maximum mesh spacing of 2 mches, and the
plastic mesh shall be as resistant to ultraviolet rad�ation as❑the❑geotextile it supports
The strength of the wire or plastic mesh shall be equivalent to or greater than as required
in Section 9-33 2(1), Table 6, for unsupported geote�ile (i e, 180 Ibs grab tensile
strength in the machine direction) Post spacing shall be as shown in Standard Plans
When sediment deposits reach approximately 1/3 the height of the sdt fence, or 8 inches
whichever is lower, the deposits shall be removed and stabdized in accordance with
Section 8-01 3(15)
8 3(9)B Gravel Filter, Wood Chip, or Compost Berm
The first paragraph is revised to read
Filter berms shall retain sediment and direct flows The gravel filter berm shall be a minimum
of 1 foot m height and shall be maintained at this height for the entire time they are in use
Rock material used for filter berms shall meet the gradmg requirements in Section 9-03 9(2),
but shall not include any recycled materials as outlined in Section 9-03 21
The last sentence in the third paragraph is revised to read
Compost shall be Med�um Compost
8 3(9)C Straw Bale Barrier
This section including title is revised to read
8-01 3(9)C Vacant
8 3(10) Wattles
This section is revised to read
Wattles are used as a flow control and sediment control device Wattles shall be installed as
soon as construction will ailow or when designated by the Engineer Wattle installation and
trenchmg shall begin from the base of the slope and work uphill prior to any topsod or compost
placement Excavated material from trenching shall be spread evenly along the uphdl slope
�
�
�
,
LJ
�
�
�
�
�
�'
�
�
�
�
�
�
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 34
Rewsed 8i27/13 �
�
and be compacted usmg hand tampmg or other method approved by the Engineer On
� gradually sloped or clay-type sods trenches shall be 2 to 3 inches deep On loose soils, in high
rainfall areas, or on steep slopes, trenches shall be 3 to 5 inches deep, or half the thickness of
the wattle, whichever is greater
�
�
�
�
Wattles shall be laid out, spaced and staked in accordance with the Standard Plans Live
stakes m accordance with Section 9-14 6(1) can be used in addition to, but not as a
replacement for, wooden stakes If trenching and staking is not possible due to rocky soils,
compost socks shall be used instead of wattles
The Contractor shall exercise care when instalimg wattles to ensure the method of installation
minimizes disturbance and prevents sediment or pollutant discharge mto water bodies
8 3(11) Vacant
This sect�on includmg title is revised to read
8-01 3(11) Outlet Protection
� Outlet protection shail prevent scour at the outlets of ponds, pipes, ditches or other
conveyances All quarry spall material used for outlet protection shall be free of extraneous
matenal and meet the gradation requirements in Section 9-13 6
�J
'
���
�
�
8 Compost Socks
This section is revised to read
Compost socks are used as a flow control and sediment control device Compost socks shall
be installed as soon as construction will allow or when designated by the Pro�ect Engmeer
Compost socks shall be mstalled prior to any mulching or compost placement Compost
socks shall be laced together end-to-end with coir rope or ends shall be securely overlapped
to create a continuous length Terminal ends of the continuous length shall be curved 2 to 4
feet upward into the slope to prevent concentrated flows from going around the terminai ends
Finished grades shall be of a natural appearance with smooth transitions Compost for
compost socks shali be Medium Compost
� Compost sock shall be laid out, spaced and staked in accordance with the Standard Plans
Live stakes in accordance with Section 9-14 6(1) can be used in addition to, but not as a
replacement for, wooden stakes If stakmg is not possible or if the compost sock is being used
� on concrete, heavy blocks or an equivalent item shall be used to we�gh down and secure the
sock Compost socks shall be laid out, spaced and staked m accordance with the Standard
Plans
�
�
�
�
�
The Contractor shall exercise care when installing compost socks to ensure that the method of
installation min�mizes disturbance of waterways and prevents sediment or poliutant discharge
into water bodies Stakes shall be removed to m�nimize soil disturbance
8 3(13) Temporary Curb
This se�tion is revised to read
Ternporary curbs shall divert or redirect water around erodible soils
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 35
, Revised 8/2T/13
Temporary curbs shall be mstalied along pavement edges to prevent runoff from flowing onto
erodible slopes Water shall be directed to areas where erosion can be controlled The
temporary curbs shall be a minimum of 4 inches in height Pondmg shall not be in roadways
8 3(16) Removal
The first sentence in the first paragraph is revised to read
When the Pro�ect Engineer determines that an erosion control BMP is no longer required, the
Contractor shall remove the BMP and all associated hardware from the pro�ect limits
The first and second sentences in the second paragraph are revised to read
The Contractor shall remove BMPs and associated hardware m a way that mirnmizes sod
disturbance The Contractor shail permanently stabilize all bare and disturbed sod after
removal of BMP's
8 4 Nleasurement
The third paragraph is revised to read
Check dams wdl be measured per Imear foot one time only along the completed check dam
No additional measurement will be made for check dams that are required to be rehabditated
or replaced due to wear
The ninth paragraph is deleted
The twelfth paragraph (after the preceding amendment is applied) is revised to read -
Seedmg, fertdizmg, liming, mulching, mowing, and tackifier will be measured by the acre by
ground slope measurement or through the use of design data
The fifteenth paragraph {after the preceding amendment is applied) is revised to read
Fencmg will be measured by the linear foot along the ground Ime of the completed fence
This section is supplemented with the following
Outlet Protection will be measured per each initial installation at an outlet location
8 5 Payment
The paragraph following the bid item, "Plastic Covermg", per square yard is revised to read
The unit Contract price per square yard for "Plastic Covermg" shall be full payment to perForm
the Work as specified in Section 8-01 3(5) and as shown in the Plans, including removal and
disposal at an approved disposal site
The bid item "Straw Bale", per each is deleted
The bid �tem " Erosion Control Blanket", per square yard is deleted
The bid item "Sod Binder or Tackmg Agent", per acre is deleted
This section is supplemented with the following
�
�
�
�
�
�
�
L�
'
�
�
�
�
�
�
�
�
�
AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Page 36
Revised 8/27/13 �
�
� "Outlet Protection", per each
The unit Contract price per each for "Outiet Protection" shall be full payment for alI costs
incurred to complete the Work
�
u
�
�
�
�
�
�
�
�
�
'
�
�
�_�
�
�
�
"Tackifier", per acre
The urnt Contract price per acre for "Tackifier" shall be full payment for all costs incurred to
complete the Work
"Biodegradable Erosion Controi Blanket", per square yard
The unit Contract price per square yard for "Biodegradable Erosion Control Blanket" shall be
full pay for all costs to complete the specified Work
"High Visibdity Silt Fence", per linear foot
Section 8-02, Roadssde Restoration
August 5, 2013
In this section, "psiPE" is revised to read "PSIPE"
8 3(2) Roadside Work Plan
The first sentence in the second paragraph is revised to read
The Roadside Work Plan shall also mclude a copy of the approved progress schedule
The sub paragraph titled "Progress Schedule" is deleted
8 3(4)C Topsoil Type C
I n this section, "9 1(2)" is revised to read "9 1{3)"
8 3(8) Planting
Item number 1 in the second paragraph is revised to read
1 Non-Irrigated Plant Material
West of the summit of the Cascade Range - October 1 to March 1
East of the summit of the Cascade Range - October 1 to November 15
8-OZ 4 Measurement
The first sentence is revised to read
Topsod, mulch and soil amendments wdl be measured by the acre along the grade and slope
of the area covered immediately after application
The seventh sentence is revised to read
Compost wdl be measured by the acre along the grade and slope of the area covered
immediately after application
8 5 Payment
The bid item "Topsoil Type ", per cubic yard and following paragraph are revised to read
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 3?
Revised 8/27/13
"Topsod Type ", per acre
The unit contract price per acre for "Topsod Type " shall be full pay for providing the
source of material for topsoil Type A and C, for pre-excavation weed control, excavating,
ioading, hauling, intermediate wmdrowing, stockpding, weed control on stockpiles or windrows,
and removal, placing, spread�ng, processmg, cultivating, and compacting topsod Type A, Type
B, and Type C
The bid item "Fme ComposY', per cubic yard is revised to read
"Fme Compost", per acre
The bid item "Medium Cornpost", per cubic yard is revised to read
"Medium Compost°, per acre
The bid item "Coarse Compost", per cubic yard and following paragraph are revised to read
"Coarse Compost", per acre
The unit Contract pr�ce per cubic yard for "Fine Compost", Medium Compost" or "Coarse
Compost" shall be full pay for furnishing and spreading the compost onto the existing soil
The bid item "Sod AmendmenY', per cubic yard and following paragraph are revised to read
"Sod Amendment", per acre
The urnt Contract price per acre for "Soil Amendment" shall be full pay for furnishmg and
incorporating the mulch onto the existing soil
The bid item "Bark or Wood Chip Mulch", per cubic yard and following paragraph are revised to
read
"Bark or Wood Chip Muich", per acre
The unit Contract pr�ce per acre for "Bark or Wood Chip Muich" shall be full pay for furrnshing
and spreading the mulch onto the existmg soil
Section 8-03, Irrigataon Systems
April 2, 2012
8-03 3(7) Flushing and Testong
The fifth paragraph is deleted
Section 8-04, Curbs, Gutters, and Spillways
Aprel 2, 2012
8-04 3(1) Cement Concrete Curbs, Gutters, and Spillways
This section is supplemented with the followmg new sub-section
�
l_.1
��
�
�
�
�
�
r
LJ
�
�
L__!
�
'
��
�
L�
� �
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 38 �
Rev�sed 8/27/13
�_J
��
�
�
�
�
C �
�
8-04 3(1)B Roundabout Cement Concrete Curb and Gutter
Roundabout cement concrete curb and gutter and roundabout splitter island nos�ng curb shall
be shaped and firnshed to match the shape of the ad�oinmg curb as shown in the Plans All
other requirements for cement concrete curb and cement cancrete curb and gutter shall apply
to roundabout cement concrete curb and gutter
8 4 Measurement
This section is supplemented with the following
Roundabout splitter island nos�ng curb wdl be measured per each
8 5 Payment
The bid item, "Roundabout Truck Apron Cement Concrete Curb", per Imear foot is deleted
Th�s section is supplemented with the following
"Roundabout Cement Concrete Curb and Gutte�", per linear foot
The unit Contract price per Imear foot for "Roundabout Csmenf Concrete Curb and Gutter"
shall be full payment for all costs for the Work including transit�ornng the roundabout cement
concrete curb and gutter to the ad�oining curb shape
"Roundabout Splitter Island Nosing Curb", per each
LJ
�
�
�
�
�
The unit Contract price per each for "Roundabout Spl�tter Island Nosing Curb" shall be full
payment for all costs for the Work including transitioning the roundabout splitter island nosing
curb to the ad�oinmg curb shape
Section 8-07, Precast Traffic Curb and Block Traffic Curb
January 7, 2013
This section's title is revised to read
8-07 Precast Traffic Curb
8 Descripteon
This section is revised to read
This Work consists of furnishing and installing precast traffic sloped mountable curb or dual
� faced sloped mountable curb of the design and type specified in the Plans in accordance with
these Specifications and the Standard Plans in the locations mdicated m the Plans or as
staked by the Engmeer
�
�
8 2 Materials
The material reference "Block Traffic Curb 9-18 3" is deleted from this section
The referenced section for the following item is revised to read
� Pamt 9-34 2
�
� AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Page 39
Revised 8/27h 3
8-07 3(1) Installing Curbs
The fifth and seventh paragraphs are deleted from this section
8-07 4 Measurement
The first paragraph is deleted from this section
8 5 Payment
The following bid items are deleted from this section
"Type A Precast Traffic Curb", per Imear foot
"Type C Precast Traffic Curb", per linear foot
"Type A Block Traffic Curb", per Imear foot
"Type C Block Traffic Curb", per linear foot
Section 8-11, Guardrail
August 5, 2013
8-11 2 Materials
The followmg matenal reference is deleted from this section
Weathering Steel Beam Guardrail 9-16 8
8 3(1)B Erection of Ra�l
The last sentence in the first paragraph is revised to read
All holes shall be painted with two coats of pamt conformmg to Section 9-08 1(2)B
The fourth paragraph is revised to read
Galvanized steel rail plates shall be fastened to the posts with galvanized bolts, washers, and
nuts of the size and kmd shown in the Plans
The last paragraph is deleted
8 3(1)D Removing Guardrail and Guardrail Anchor
The first two sentences in the first paragraph are revised to read
Removai of the various types of guardrail shall include removal of the rad, cabie elements,
hardware, and posts, mcludmg transition sections, expansion sections, terminal sections and
the rad element of anchor assemblres Removai of the various types of guardrail anchors shali
include removal of the anchor assembly, including concrete bases, rebar, steel tubes, and any
other appurtenances in the anchor assembly
8 4 Measurement
The seventh paragraph is revised to read
Measurement of removal of guardrad will be by the linear foot measured along the line of
guardrad removed mcluding transition sections, expansion sections, guardrad anchor rail
elements and terminal sections
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 40 �
Revised 8/27/13
�
�
8-11 5 Payment
The bid item "Weathering St Beam Guardrad Type
", per Imear foot is deleted
�
��
�
The second paragraph is revised to read
The unit Contract price per linear foot for "Beam Guardrad Type ", "Beam Guardrail Type
1- Ft Long Post", and "Beam Guardrad Type 31- Ft Long Post", shall be full
payment for all costs to obtain and provide materials and perForm the Work as described �n
Sections 8-11 3(1)A and 8-11 3(1)B, including costs for additional rad elements when nested
rad is required, and when connections to concrete masonry Structures are required
The paragraph following the bid item "Removing Guardrad Anchor", per each �s revised to read
The unit Contract price per each for "Removmg Guardrail Anchor" shail be full payment for all
� costs to perform the Work as described m Section 8-11 3(1)D, including rad removal, �f there
isn't a Bid Item for Removing Guardrail m the run of guardrail connecting to the anchor
�
�
�
�
LI
�
�
�J
�
�
�
�
Sect�on 8-12, Chain Link Fence and Wire Fence
April 2, 2012
In this Section "Engineer" is revised to read "Pro�ect Engrneer"
8 2 Materoals
This section is supplemented with the followmg
Paint 9-OS 1(2)B
8 3(1)A Posts
The words "for Type 3 and Type 4 fences" and "on Type 3 and Type 4 fences" are deleted from this
section
The first sentence of the fifth paragraph is revised to read
After the post is set and plumbed, the hole shall be fdled with Grout Type 4
The third sentence in the sixth paragraph is replaced with the following finro sentences
After the post is set and piumbed, the hole in the portion of the post in solid rock shall be filled
with Grout Type 4 The grout shall be thoroughly worked into the hole so as to leave no voids
The seventh paragraph is deleted
The ninth paragraph is revised to read
Steep slopes or abrupt topography may require changes m various elements of the fence It
shall be the responsibdity of the Contractor to provide all posts of sufficient length to
accommodate the cham link fabric
The tenth paragraph is revised to read
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 41
� Revised 8/27/13
All round posts shall have approved top caps fastened securely to the posts The base of the
top cap fittmg for round posts shall feature an apron around the outside of the posts
8 3(1)B Top Rail
This section's content including title is deleted and replaced with
8-12 3(1)B Vacant
8 3(1)C Tension Wire and 1'ension Cable
This section's content including title is revised to read
8-12 3(1)C Tension Wire
Tension Wires shall be attached to the posts as detaded in the Plans or as approved by the
Engineer
8 3(1)D Chain Link Fabric
The first three paragraphs are revised to read
Chain link fabric shall be attached after the cables and wires have been properly tensioned
Chain link fabric shall be placed on the face of the post away from the H�ghway, except on
horizontal curves where it shall be placed on the face on the outside of the curve unless
otherwise directed by the Pro�ect Eng�neer
Cham link fabnc shall be placed approximately 1-inch above the ground and on a straight
grade between posts by excavatmg high points of ground Fdling of depressions will be
permitted only upon approval of the Pro�ect Engineer
The fourth sentence in the fourth paragraph is revised to read
The top and bottom edge of the fabric shall be fastened with hog rings to the top and bottom
tension wires as may be applicable, spaced at 24-inch intervals
8 3(1)E Chain Link Gates
The third paragraph is deleted
8-12 3(2)A Posts
In the second paragraph, "commercial" is deleted
The first sentence of the fifth paragraph is rev�sed to read
After the post is set and plumbed, the hole shall be fdled with Grout Type 4
The fourth sentence in the sixth paragraph is replaced with the followmg finro sentences
After the post is set and piumbed, the hole m the portion of the post m solid rock shall be filled
with Grout Type 4 The grout shall be thoroughly worked mto the hole so as to leave no voids
The tenth paragraph is revised to read
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 42
Rev�sed S/27/13 �
�
�
r
�
�
�
��
Where the new fence �oins an existmg fence, the 2 shall be attached in a manner satisfactory
to the Pro�ect Engineer, and end or corner posts shall be set as necessary
The eleventh paragraph is deleted
8 5 Payment
The paragraph followmg the item "Chain Link Fence Type ", per linear foot is revised to read
The unit Con#ract price per linear foot for "Chain Link Fence Type " shall be full payment
for ail costs for the specified Work includmg brace post installation and all other requirements
of Section 8-12 for Chain Link Fence, unless covered in a separate Bid Item in this Section
The following paragraph is mserted after the item "End, Gate, Corner, and Puil Post for Cham Link
Fence", per each
The unit Contract price per each for "End, Gate, Corner, and Pull Post for Chain Link Fence"
shall be full payment for all costs for the specified Work
The following paragraph is inserted after the item "Single 6 Ft Chain Link Gate°, per each
' The unit Contract price per each for "Double 14 Ft Chain Lmk Gate", "Double 20 Ft Cham
Link Gate", and "Single 6 Ft Cham Link Gate", shall be full payment for all costs for the
specified Work
� The paragraph following the item "Wire Fence Type ", per Imear foot is revised to read
�
�
�;
��
�
�
�
�
�
�
The unit Contract price per each for "Wire Fence Type " shall be full payment for all costs
for the specified Work includmg payment for clearing of the fence line
The follow�ng paragraph is inserted after the item "Double Wire Gate 20 Ft Wide", per each
The urnt contract price per each for "Single Wire Gate 14 Ft Wide" and "Double Wire Gate 20
Ft Wide" shall be full payment for afl costs for the specified Work
The paragraph followmg the item "Access Control Gate", per each is revised to read
The unit contract price per each for "Access Control Gate" shall be full payment for all costs to
perform the specified Work
Section 8-15, Riprap
April 2, 2012
8-15.1 Description
The second paragraph is revised to read
Riprap will be classified as heavy loose riprap, light loose riprap, and hand placed riprap
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 43
� Revised 8/27/13
Section 8-20, Illumination, Traff�c Signal Systems, And Electrical
August 5, 2013
8-20 3(4) Foundations
The first paragraph is revised to read
Foundat�on concrete shall conform to the requirements for the specified class, be cast-�n-place
concrete and be constructed m accordance with Sections 6-02 2 and 6-02 3 Concrete for
Type II, III, IV, V, and CCTV signal standards and light standard foundations shall be Class
4000P Concrete for pedestals and cabinets, Type PPB, PS, I, FB, and RM signal standards
and other foundations shall be Class 3000 Concrete placed mto an excavation where water
is present shall be placed using an approved tremie If water is not present, the concrete shall
be placed such that the free-fall is vertical down the center of the shaft without hitting the
sides, the steel reinforang bars, or the steel reinforcing bar cage braang The Section 6-
02 3(6) restriction for 5-feet maximum free-fall shall not apply to placement of Class 4000P
concrete into a shaft Steel remforcing bars for foundations shail conform to Section 9-07
8 3(5) Conduit
This sections content is deleted and replaced with the following new sub
8 3(5)A General
The ends of ail conduit, metallic and nonmetallic, shall be reamed to remove burrs and rough
edges Field cuts shall be made square and true The ends of unused conduits shail be
capped When conduit caps are removed, the threaded ends of inetal conduit shall be
provided with approved conduit bushings and non-metal conduit shall be provided with end
bells
Reducmg couplings will not be permitted
Exist�ng conduit in place scheduled for installation of new conductor(s) shall first have any
ex�stmg conductor(s) removed and a cleaning mandrel shall be pulled through The existing
conduit shall then be prepared sub�ect to the same requirements outlined m this paragraph, for
new conduit and innerduct, unless otherwise ind�cated in the plans All new conduit and all
innerduct shall be blown clean with compressed air Then in the presence of the Engineer, an
80 percent sizing mandrel, correctly sized for the raceway, shall be pulled through to ensure
that the raceway has not been deformed This shall be done prior to pulling wire or fiber optic
cable and after fmal assembly is in place Existing conductor(s) shall be reinstalled unless
otherwise indicated m the Plans
As soon as the sizing mandrel has been pulled through mnerduct, a 200-Ib mmimum tensile
strength pull string shall be mstalled and attached to duct plugs at both ends When conduit is
installed for future use, as soon as the bushing or end bell has been �nstalled and the sizing
mandrel has been pulled through, the ground wire shall be installed and both ends shall be
capped
8-20 3(5)A1 Fiber Optic Conduit
Where conduit to contain fiber optic cabie or conduit identified to contain future fiber optic
cable is installed by open trenching, Detectable Underground Warning Tape shall be
placed 12-mches above the conduit unless otherwise detailed in the Plans Detectable
Underground Warning Tape shall extend 2-feet into boxes or vaults Splicmg of the tape
shall be in accordance with tape manufacturer's recommended materials and procedures
��
�
�
�
�
�
�
�
�
�
�
�
�
�
�
,
�
�
�
i_.1
AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK page 44
Revised 8/27/13 �
�i
Location Wire shall be installed with all nonmetallic conduit that contains fiber optic cable
, and all conduits identified to contam future fiber optic cabie When open trenchmg is used,
the location wire shall be placed in continuous lengths directly above the condwt Where
conduit is mstalled by other methods, the Location Wire shall be attached to the outside of
� the conduit with electrical tape placed at mirnmum 18-mch intervals Location Wire shali
extend 12-feet mto boxes or vaults Splices shall be crimped using a non-insulated butt
splice, soidered and covered with moisture-blocking heat shrink
�
L�
8-20 3(5)A2 ITS and Cabinet Outer and Inner Duct Condu�t
ITS conduit and both ends of conduit runs entering cabinets, with the exception of the '/
inch grounding conduit, shall be sealed with self expanding water proof foam or
mechanical plugs, unless otherwise required At other locations condwt shall be sealed
with Duct Seal
� Outer-duct conduit w�th non factory assembled mnerduct shali be sealed around the
innerduct with self-expanding waterproof foam Outer-duct conduit with factory
assembled innerduct shall be sealed around the innerduct with a multiplex expansion
plug Innerduct containing one cable shall be plugged using an expandable split plug
1 Innerduct with multiple cables shali be sealed with self-expanding waterproof foam Duct
plugs shall be instalfed in all unused mner-ducts (those that are specified as empty) at the
time of conduit installation Duct plugs shall be mstalled m all used mner-ducts (as
, specified in the Plans), at the time of conduit installation, unless cable pull�ng for those
inner-ducts wdl commence within 48-hours Installation shall conform to the
manufacturer's recommendat�ons
,
Foam sealant shall be mstalled with the following additional requirements
1 Penetration of the sealant into the conduit or duct shall be limited usmg a high
� temperature backer rod material or rag
2 Penetration of the sealant mto the conduit shal! be limited to 1-inch
3 The foam sealant shall not pro�ect outside the end of the conduit or duct
�1
r
�
�
�
�
�
�
Where open trenching is allowed and conduit with innerduct is instailed, a maximum of
1000-feet of continuous open trench will be allowed unless otherwise approved by the
Engineer
8 3(5)B Conduit Type
Conduit shall be PVC, high density polyethylene (HDPE), rigid metal conduit (RMC) or liquid
tight flexible metal depending on the application
Rigid metai conduit (RMC) shall be installed at the followmg locat�ons
Within radroad right of way
2 All pole risers, except when otherwise required by owning utdities
3 All surtace-mounted conduit, with the exception of electrical service utility poles
4 All runs withm siip form placed concrete
Service lateral runs shail be Schedule 80 PVC except when otherwise required by owning
utdities Conduit �nstalled usmg the plowing method, shall be schedule 80 high-density
polyethylene (HDPE)
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 45
� Rev�sed 8/27/13
Conduit runs, includmg outer-duct, that enter the traveled way or shoulders, shall be Schedule �
80 high-density polyethylene (HDPE), Schedule 80 PVC, or rigid metal conduit (RMC)
Condu�t runs, mcluding outer-duct, which do not enter the traveled way or shoulders, shall be
Schedule 80 high-density polyethylene (HDPE), Schedule 40 PVC or rigid metal conduit
(RMC)
Liquid tight flexible metal conduit is allowed only at locations called for in the Plans
Except as descnbed under Non-Metallic Conduit, unless otherwise �ndicated in the Plans or
Standard Plans, the same type of conduit shall be used for the entire length of the run, from
outlet to outlet
Innerduct shall have a smooth wall non ribbed interior surface, with factory pre-lubricated
coating
Innerduct within the Traveled Way or Shoulders and innerduct which is not factory installed
shall be schedule 40 high-density polyethylene (HDPE) The �nnerduct sha{I be contmuous
with no splices Innerduct which is pulled into the outer duct m the field shall be mstalled with
an extra 2 feet of conduit beyond each end of the outer-duct and shall be allowed to finish
contracting for 21 calendar days before it is terminated Innerduct shall be termmated with
end bells flush to '/< mch out of the outer-duct and the space befinreen the outer-duct and
innerduct shall be sealed with rodent and moisture res�stant foam designed for this application
and installed m accordance with the manufacturer's recommendations
8-20 3(5)B1 R�g�d Metal Conduit
Slip �oints or runnmg threads will not be permitted for coupling metallic conduit, however,
running threads wdl be permitted in traffic signal head spiders and rigid metal conduit
(RMC) outer-duct When mstalling rigid metal conduit (RMC), if a standard couplmg
cannot be used, an approved three-piece coupling shall be used Conduit bodies, fittings
and coupimgs for rigid metal conduit (RMC) shall be cleaned first and then painted with
one coat of paint conformmg to Section 9-08 1(2)B The paint shall have a rninimum wet
fdm thickness of 3-mds The pamted coating shall cover the entire coupling or fittmg The
threads on a11 metal conduit sha11 be rust-free, clean, and painted with colloidal copper
suspended m a petroleum vehicle before couplmgs are made All metallic couplings shall
be tightened so that a good electrical connection wdl be made throughout the entire
length of the conduit run If the conduit has been moved after assembly, it shall be given a
final tightening from the ends prior to backfilling
Rigid metal conduit (RMC) ends shall be terminated with grounded end bushings Rigid
metal conduit (RMC) entermg cable vaults or pull boxes shali extend 2-inches beyond the
inside wall face (for the instaliation of grounded end bushmg and bonding )
Rigid metal conduit (RMC) entering concrete shall be wrapped in 2-inch-w�de pipe wrap
tape with a minimum 1-inch overlap for 12-mches on each side of the concrete face Pipe
wrap tape shall be mstalled in accordance with the manufacturer's recommendations
Rigid metal conduit (RMC) bends shall have a radius consistent with the requirements of
Code Article 344 24 and other articles of the Code Where factory bends are not used,
conduit shall be bent, usmg an approved condu�t bendmg tool employing correctly sized
dies, without crimping or flatternng, using the longest radius practicable
�
L�
�
��
�
�
�
,
�
�
r
�
LJ
��
�
a
�
�
r
'
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 46
Rewsed 8/27N3 �
C�
�
�
�
��
�
�
�
�
�
��
�i
�
�
�
�
�
�
�
Where the coating on
such damaged areas
08 1(2)B
galvarnzed conduit has been damaged in handling or installing,
shall be thoroughly pamted with paint conformmg to Section 9-
Metal conduit ends shall be threaded and protected with a snug fitting plastic cap that
covers the threads untd wiring is started
8-20 3(5)B2 Non-Metallic Conduit
Where non-metallic conduit is mstailed, care shall be used m excavatmg, instailing, and
backfillmg, so that no rocks, wood, or other foreign material will be left in a position to
cause possible damage
PVC conduit ends shall be terminated with end bell bushmgs PVC or HDPE conduit
entering cable vaults and pull boxes shall terminate with the end bell flush with the inside
walls of the Structure
Non-metallic conduit bends, where allowed, shall conform to Article 352 24 of the Code
Eighteen-inch radius elbows shall be used for PVC conduit of 2-inch nommal diameter or
less Standard sweep elbows shall be used for PVC conduit with greater than 2-mch
nominal diameter unless otherwise specified in the Plans In nonmetallic conduit less than
2-inch nominal diameter, pull ropes or flat tapes for wire installation shall be not less than
%<-mch diameter or width In nonmetallic conduit of 2-inch nominal diameter or larger, pull
ropes or flat tapes for wire installation shall be not less than '/Z-inch diameter or width
When HDPE conduit is used for directional bormg, it shall be continuous, with no �oints,
for the full length of the bore The conduit run shall be extended to the associated outlets
with the same schedule HDPE or PVC conduit Entry into associated �unction box outlets
shall be with the same schedule PVC conduit and elbows The same requirements apply
for extension of an existing HDPE conduit crossing
PVC conduit and elbows shall be connected to HDPE conduit with an approved
mecharncal coupling The connection shall have mmimum pullout strength of 700-pounds
Prior to mstallation of a mecharncal coupling, the HDPE conduit shall first be prepared
with a clean, straight edge A water-based pullmg lubricant may be applied to the
threaded end of the mechanical coupling before installation Solvent cement or epoxy
shall not be used on the threaded �oint when connecting the HDPE conduit to the
mechanical coupling The mecharncal coupling shall be rotated until the HDPE conduit
seats approximately 3 / of the distance into the threaded couplmg depth
For PVC installation through a directional bore, the PVC shall be in rigid sect�ons
assembled to form a watertight bell and spigot-type mechanical �oint with a solid retammg
ring around the entire circumference of the conduit installed in accordance with the
manufacturer's recommendations The conduit run shall be extended beyond the length
of the bore, to the associated outlets with the same mechanical coupled PVC or with
standard PVC conduit of the same schedule The same requirements apply for extension
of an existing PVC conduit Roadway crossing
PVC conduit shall be assembled usmg the solvent cement specified in Section 9-29 1
Conduit ends shall be protected with a snug fitting plastic cap until wiring is started
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 47
� Revised 8/27J13
Conduit caps, end bells and the section of PVC befinreen the coupiing and end bell
bushing m cabmet foundations shall be installed without glue
8 3(5)C Conduit Size
The size of conduit used shali be as shown in the Pians Conduits smaller than 1-mch
electrical trade size shall not be used unless otherwise spec�fied, except that grounding
conductors at service pomts may be enclosed m'/2-inch-diameter conduit
Conduit between light standards, PPB, PS, or Type 1 poles and the nearest �unction box shall
be the diameter specified m the Plans Larger size conduit is not allowed at these locations At
other locations it shall be the option of the Contractor, at no expense to the Contractmg
Agency, to use larger size conduit if desired, provided that �unction box or vault capacity is not
exceeded Where larger size conduit is used, it shall be for the entire length of the run from
outlet to outlet
Conduit runs with innerduct, shall have 4-inch outer-duct and shall be installed with four 1-mch
innerduct unless otherwise mdicated in the plans
8 3(5)D Condu�t Placement
Conduit sha11 be laid so that the top of the conduit is a mmimum depth of
24-inches below the bottom of curb in the sidewalk area
2
3
4
5
24-inches below the top of the roadway base
48-inches below the bottom of ties under railroad tracks unless otherwise specified
by the radroad company
36-inches below finish grade when installed usmg conduit plowmg method
24-inches below the fmish grade m all other areas
Conduit entering through the bottom of a �unction box shall be located near the end walls to
leave the ma�or portion of the box clear At all outlets, conduit shall enter from the direction of
the run, terminating 6 to 8-inches below the �unction box lid and within 3-�nches of the box wall
nearest its entry location
Conduit runs shown in the Plans are for Bidding purposes only and may be relocated with
approval of the Engineer, to avoid obstructions
8-20 3(5)D1 Surface Mounting
Where surface mounting of conduit is required, supports shall consist of channel with clamps
sized for the conduit Support spacing shall comply with the Code, with the exception that
spacing of channel supports for conduit sha11 not exceed 5-feet
The mmimum distance between ad�acent ciamps and between the clamp and the end of the
channel supports shall be 1-inch Channel supports shall be mstalled with stops, to prevent
clamps from sliding out of the ends
8-20 3(5)D2 3tructures
All conduits attached to or routed within bridges, retainmg walis, and other structures shall be
equipped with approved expansion, deflection, and/or combmation expansion/deflection
fittings at all expansion �oints and at all other �oints where structure movement is anticipated,
mcluding locations where the Contractor, due to construction method, instalis expansion
and/or construction �oints with movement All conduit fittmgs shail have movement capac�ty
�
�
�
C J
�
�
�
�
�
I�
�
�)
�
�
�
�
�
r
�_�
AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Page 48
Rev�sed 8/27/73 �
��
�J
appropriate for the anticipated movement of #he Structure at the �oint Approved deflection
� fittings shall also be installed at the �oint between the bridge end and the retaining wall end,
and the trans�t�on from bridge, wall, or other structure to the underground section of conduit
pipe
�
�
�
�
�
�
�
'
�
'
�
�
�
�
�
L.J
8 3(5)E Method of Condu�t Installation
Conduit shall be placed under existmg pavement by approved directional boring, �acking, or
drilling methods at locations approved by the Engineer The pavement shall not be disfurbed
unless allowed in the Plans or with the approval of the Engineer in the event obstructions or
impenetrable sods are encountered High density polyethylene (HDPE) conduit runs, which
enter the traveled way or shoulders, shall be mstalled using the directional boring method
8-20 3(5)E1 Open Trenching
When open trenching is allowed, trench construction shail conform to the following
2
3
�
The pavement shall be saw-cut a minimum of 3-inches deep The cuts shall be
parallel to each other and extend 2-feet beyond the edge of the trench
Pavement shall be removed in an approved manner
Trench depth shall provide a minimum cover for conduit of 24-inches below the
top of the roadway base
Trench width shall be 8-inches or the conduit diameter plus 2-mches, whichever
is larger
5 Trenches located within paved Roadway areas shall be backfilled with
Controlled density fiil (CDF) meeting the requirements of Section 2-09 3(1)E
The controlled density �II shall be placed levei to, and at the bottom of, the
existing pavement The pavement shall be replaced with pavmg matenal
matches the existmg pavement
6 On new construction, conduit shall be placed prior to placement of base course
pavement
8-20 3(5)E2 Conduit Plowing
All conduit plowmg shall be supervised by a licensed electrical Contractor
The starting point shall be anchored or held such that conduit movement at the start of
the plowing operation is kept to a mirnmum The conduit reel shali be mounted on the
vehicle such that condu�t movement is kept to a mirnmum once it is in the ground Use of
a stationary reel is not allowed The feed shoe shall have rollers which conform to the
conduit at a radius of not less than 15 times the diameter of the conduit The conduit w�ll
not be permitted to pass over stationary guides nor over rollers or sheaves, which wdl
permit a bend radius of less than 15 times conduit diameter The width of the tooth and
feed shoe shall not exceed the conduit diameter by more than 2-mches
The conduit shatl be installed usmg a continuous reel, with no �omts, for the full length of
the conduit run, unless conduit splicing is allowed as indicated below
If an obstruction is encountered that cannot be plowed through, the followmg remedies
shall be attempted in order
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 49
� Revised 8/27N3
Contractor shall stop the plowing operation and attempt to remove the
obstruction If the obstruction is �emoved, plowing operations shall contmue
along the approved path
2 Deviations of up to one foot from the pro�ected path may be authorized by the
Engineer, provided the new route does not result in total conduit run bends
exceeding NEC requirements Deviations in excess of one foot from the
pro�ected path are not allowed and the maximum taper rate is 1-inch per linear
foot of conduit
3 The Contractor may request approval to intercept the installed conduit and route
another section of HDPE to avoid the obstruction, provided the new route does
not result in total conduit run bends exceeding NEC reqwrements Connection
between the sections shall be accomplished using an approved fusion splicing
method, which is compatible with the conduit manufacturer's recommendations
4 Where none of the above remedies are successful, all condwt installed so far in
that run shall be removed and a new plow path established to avoid the
obstruction
In the event of a breakage, all conduit installed m that run shall be removed
The condu�t run shall be extended to the assoc�ated outlets, sub�ect to the same
requirements indicated when HDPE is mstalled using the directional bonng method
The depth of installation shall be contmually ad�usted as necessary to compensate for
changes in terrain
Plowed conduit shall be laid so that the top of the conduit is a minimum depth of 36-
mches below the finish grade with the exception that the conduit shall be swept up to
enter the knock outs of associated pull boxes or cable vaults
The plow piacing the conduit shall be marked at a proper distance above the plow's
conduit exit pomt to indicate when the mirnmum installation depth is not met The mark
shall be visible from a safe distance from the plowing operation when it is exposed above
ground Whde plowmg this mark must remain below ground level at afl times, with the
exception of the entry and exit points at the end of the run, in order to ensure that
minimum burial depth of the conduit is achieved
If the depth mark on the plow comes above ground, the Contractor shall stop the plowing
operation and attempt to correct the placement depth If the conduit depth can be verified
to meet the minimum burial requirements at the location where the depth mark came
above ground, the plowmg operation shall resume sub�ect to the Engineers approval
The compacted surface shall be firm, non-yieldmg, and result m a finished surface that
matches the I�nes and grades of the terrain prior to plowmg
8-20 3(5)E3 Bor�ng
Bore pits shali be backfilled and compacted in accordance with Section 2-09 3(1)E
Directional boring, Jackmg or drilling pits shall be a minimum of 2-feet from the edge of
any type of pavement, unless otherwise approved by the engmeer Excessive use of
water that might undermine the pavement or soften the Subgrade will not be permitted
�J
�
�
,
�
L�
�
�
�
�
-,
_l
�
II
u
�
�
L _1
�
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 50
Rewsed 8/27H 3 �
�
�
�
LJ
�
�
,
�
�
�
�
�
�
�
When approved by the Engineer, small test holes may be cut in the pavement to locate
obstructions When the Contractor encounters obstructions or is unable to install conduit
because of sod conditions, as determmed by the Engineer, additional Work to place the
conduit will be paid m accordance with Section 1-04 4
8-20 3(5)E4 Direct�onal Boring
Directional boring for electrical installations shall be supervised by a licensed electrical
contractor in accordance with Section 8-20 1(1) Where directional boring is called for,
conduit shall be installed us�ng a surface-launched, steerable drilling tool Drdling shall be
accomplished usmg a high-pressure fluid �et toot-head The drdlmg fluid shall be used to
mamtain the stabdity of the tunnel, reduce drag on the conduit, and provide backfiil
between the conduit and tunnel A guidance system that measures the depth, lateral
position, and roll shall be used to guide the tool-head when creating the pilot hole Once
the pilot hole is established, a reamer and swivei shall be used to �nstall the conduit
Reammg diameter shall not exceed 1 5 times the diameter of the conduits bemg installed
Conduit that is being pulled into the boring shall be mstalled in such a manner that the
conduit is not damaged during mstallation The pullback force on the conduit shall be
controlled to prevent damage to the conduit A vacuum spoils extraction system shall be
used to remove any excess spoils generated during the installation Excess drilling fluid
and spoils shall be disposed of The method and location used for disposal of excess
drdling fluid and spods shall be sub�ect to the Engineer's approvai Drilling fluid returns
(caused by fracturing of formations) at locations other than the entry and exit points shall
be mirnmized Any drilling fluid that surFaces through fracturing shall be cleaned up
immediately Mobde spoils-removal equipment capable of quickly removing spods from
entry or exit pits and areas with returns caused by fracturmg shall be used as necessary
dunng dnlling operations
8-20 3(5)E5 Boring woth Casing
Where boring with casing is called for, the casing shall be placed using an auger inside
the casing to remove the sod as the casing is �acked forward The auger head shali
proceed no more than 4-mches ahead of the pipe being �acked Boring operations shall
be conducted to prevent caving ahead of the pipe Installed casing pipe shall be free from
grease, dirt, rust, moisture, and any other deleterious contaminants
The space between the conduit and casing shall be plugged with sandbags and a grout
seal 12-mches thick at each end of the casing Casing abandoned due to an encountered
obstruction shall be grout sealed in the same manner Grout shall conform to Section 9-
20 3(4)
In lieu of sandbags and grout, unopened prepackaged concrete and grout may be used to
seal the casing
� Material shall not be removed from the bormg pit by washmg or sluicmg
All �omts shall be welded by a Washington State certified welder Weiding shall conform to
AWS D 1 1-80 Structural Welding Code, Section 3, Workmanship
�
��I
�
�
8 3(8) W�rang
The fifteenth through seventeenth paragraphs are revised to read
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 51
� Revised 8/27/13
When conductors, e�ther cable or single, are being installed, the Contractor shall not exceed
the tension limitations recommended by the manufacturer Conductors may be pulled directly
by hand, or with mecharncal assistance If conductors are pulled by any mecharncal means, a
dynamometer with drop-needle hand shall be used on every mechanically assisted pull
On mechanicalty assisted pulls, msulation shall be stripped off the individuai conductor and the
conductor formed into a pulling eye and firmly attached to the puliing rope/tape, or a cabie grip
shall be used The Contractor shall deterrnme the maximum allowable pulling tension, taking
into account the direction of the pull, type of raceway, cable geometry, weight of the cable, the
coe�cient of friction, and side wall pressure, usmg the information from the cable
manufacturer If there are bends m the raceway or sheaves are used for the cable puii, the
Contractor shall use the cable manufacture's side wall pressure limits to determine the
maximum pullmg tension The maximum pulling force appiied dtrectly to the conductor when
puiling eyes are used or when the conductor is formed mto a loop, shall be limited to that
shown m the following table for copper conductor When a cable grip is applied over
nonmetaliic sheathed cables, the maximum puiling force shall be limited to 1,000-pounds
provided this is not m excess of the force as determined above
Conductor Pounds
8 132
6 210
4 334
3 421
2 531
1 669
1 /0 845
2/0 1,065
3/0 1, 342
4/0 1,693
250Kcmd 2,000
500Kcmil 4,000
Adequate lubrication of the proper type to reduce friction m conduit and duct pulls shall be
utilized The grease and o�l-type lubricants used on lead sheathed cables shail not be used on
nonmetall�c sheathed cables
8 3(9) Bonding, Grounding
The first sentence m the second paragraph is replaced with the following finro sentences
All conduit installed shall have an equipment ground conductor installed m addition to the
conductors noted m the Contract Conduit with innerducts shall have an equipment ground
conductor mstalled in each innerduct that has an electrical conductor
�
�
�
r
�
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 52
Revised 8l27/13 �
�
�
,
Section 8-21, Perrnanent Segning
January 7, 2013
8-21 2 Materials
The third sentence is revised to read
Materials for sign mounting shall conform to Section 9-28 11
'
�
�
�
C�
�
�
�
8 3(9)A Fabrication of Steel Structures
The first sentence in the first paragraph is revised to read
Fabrication shall conform to the applicable requirements of Section 6-03 and 9-06
This section is supplemented with the followmg
All fabrication, inciuding repairs, ad�ustments or modifications of previously fabr�cated sign
structure members and connection elements, shail be performed �n the shop, under an
Eng�neer approved shop draw�ng prepared and submitted by the Contractor for the original
fabrication or the specific repair, ad�ustment or modificat�on Sign structure fabrication repair,
ad�ustment or modification of any kind in the field is not permitted if fabrication repair,
ad�ustment or modification occurs after a sign structure member or connection element has
been galvarnzed, the entire member or element shall be re-galvanized in accordance with
AASHTO M 111
8 3(9)B Vacant
This section including title is revised to read
8-21 3(9)B Erect�on of Steel Structures
Erection shall conform to the applicable requirements of Sections 6-03 and 8-21 3(9)F
Section 8-21 3(9)F notwithstanding, the Contractor may erect a sign bridge prior to completion
of the shaft cap portion of one foundation for one post provided the following condit�ons are
satisfied
� 1 The Contractor shall submit design calculations and working drawings of the
temporary supports and falsework supporting the sign bridge near the location of the
mcomplete foundation to the Engineer for approval in accordance with Section 6-
� 01 9 The submittal shall �nclude the method of releasing and removmg the
temporary supports and falsework without mducing loads and stress into the sign
bridge
'
'
�
'
'
2 The Contractor shall submit the method used to secure the anchor bolt array in
proper position with the sign bridge while casting the shaft cap concrete to complete
the foundation
3 The Contractor shall erect the sign bridge and temporary supports and falsework,
complete the remainmg portion of the mcomplete foundation, and remove the
temporary supports and falsework, in accordance with the working drawing
submittals as approved by the Engineer
8 3(9)F Foundations
The following new paragraph is inserted after the second paragraph
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 53
� Revised 8/27H3
Concrete placed into an excavation where water is present shall be placed using an approved
tremie If water is not present, the concrete shall be placed such that the free-fali is vertica{
down the center of the shaft without hittmg the sides, the steel remforcing bars, or the steel
reinforcing bar cage bracing The Section 6-02 3(6) restrict�on for 5-feet maximum free-fall
shall not apply to placement of Class 4000P concrete into a shaft
The rnnth paragraph (after implementmg the preceding Amendment) is replaced with the followmg
three new paragraphs
After construction of concrete foundations for sign bridge and cantdever sign structures, the
Contractor shall survey the foundation locations and elevations, the anchor bolt array locations
and lengths of exposed threads The Contractor shal( confirm that the survey conforms to the
sign structure post, beam, span and foundation design geometry shown m the Plans, and shall
identify any deviations from the design geometry shown in the Plans When deviations are
identified, the Contractor shall notify the Engmeer, and such notice shall be accompanied by
the Contractor's proposed method(s) of addressing the deviations, mcludmg removai and
reconstruction of the shaft cap portion of the affected concrete foundation as outlined in this
Section, or fabrication repair, ad�ustment or modification, with associated shop drawings, in
accordance with Section 8-21 3(9)A
If the Contractor's survey indicates that a concrete foundation has been constructed
incorrectly for a sign structure that has aiready been fabricated, the Contractor may remove
and reconstruct the shaft cap portion of the foundation, in accordance with Section 1-07 13,
provided the following conditions are satisfied
The Contractor shall submit the method and equipment to be used to remove the
portion of the concrete foundation to be removed and reconstructed to the Engineer
for approval in accordance with Section 1-05 3 The submittal shall include
confirmation that the equipment and the method of operation is appropriate to ensure
that the existing anchor bolt aRay and pnmary shaft vertical steel re�nforcing bars will
not be damaged
2 All steel reinforcing bars, except for steel reinforcing bars extending from the bottom
portion of the foundation to remain, shall be removed and disposed of in accordance
with Sections 2-02 3 and 2-03 3(7)C, and shall be replaced with new steel reinforcmg
bars conforming to the size, dimensions and geometry shown in the Plans All
concrete of the removed portion of the foundation shall be removed and disposed of
in accordance with Sections 2-02 3 and 2-03 3(7)C
3 The Contractor shall ad�ust the primary shaft vertical steel reinforcing bars as
necessary in accordance with Section 6-02 3(24)C to provide clearance for the
anchor boit array
Sign structures shall not be erected on concrete foundations untd the Contractor confirms that
the foundations and the fabricated sign structures are either compatible with each other and
the design geometry shown in the Plans, or have been modified on accordance with this
Section and as approved by the Engineer to be compatible with each other, and the
foundations have attained a compressive strength of 2,400-psi
Item number 4 in the twelfth paragraph (after implemented the preceding Amendments) is revised
to read
AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Page 54
Rev�sed 8/27/13 '
�
' 4 Concrete shail be Class 4000P, except as otherwise specified The concrete for the shaft
cap (the portion contairnng the anchor bolt array assembl�es above the construction �oint
at the top of the shaft) shall be Ciass 4000
�
�
�
�
�L J
�
�
LJ
�
Item number 3 m the thirteenth paragraph (aftar �mplemented the precedmg Amendments) is
revised to read
3 Unless otherwise shown in the Plans, concrete shall be Class 4000P
8 5 Payment
This section is supplemented with the following
All costs m connection with surveying completed concrete foundations for sign bridges and
cantdever sign structures shall be mcluded in the lump sum contract price for "Structure
Surveying", except that when no Bid item is included in the Proposal for "Structure Surveying"
then such costs shall be included in the lump surn contract price(s) for "Sign Bridge No "
and "Cantdever Sign Structure No "
Section 8-22, Pavement Marking
January 7, 2013
8-22 3(3)D Line Applications
The last paragraph is supplemented with the following
Grooved Ime pavement marking shall not be constructed on bridge decks or on bridge
approach slabs
8 3(6) Removal of Pavement Markings
The foliowing two new sentences are inserted after the first sentence
Grinding to remove pamted markmgs is not allowed Grinding to remove plastic markmg is
' allowed to a depth �ust above the pavement surface, then water blasting or shot blasting shall
be required to remove the remaining markings
�
�
'
�_�
�
�
8 4 Measurement
The items "Pamted Wide Line" and "Plastic Wide Line" are deleted from the fourth paragraph
The sixth paragraph is rev�sed to read
Diagonal lines used to delineate parking stalis that are constructed of painted or plastic 4-inch
lines wdl be measured as "Paint Line" or "Plastic Line" by the linear foot of line installed
Crosswalk line will be measured by the square foot of markmg installed
The following two new paragraphs are inserted after the sixth paragraph
Crosshatch marlungs used to delineate median and gore areas wdl be measured by the
completed Imear foot as "Painted Crosshatch Marking" or "Plastic Crosshatch Marking"
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 55
� Revised 8/27N3
The measurement for "Pamted Crosshatch Marking" and for "Plastic Crosshatch Marking" wdl
be based on the total length of each 8-inch or 12-inch wide line installed
8 5 Payment
The bid items "Painted Wide Line", per linear foot and "Plastic Wide Line", per linear foot are
deleted from this section
This section �s supplemented with the followmg two new bid items
"Painted Crosshatch Marking", per linear foot
"Plastic Crosshatch Marking", per linear foot
The following new paragraph is inserted after the last bid item in this section
The unit Contract price for the aforementioned Bid items shalf be full payment for all costs to
perform the Work as described in Section 8-22
Section 8-25, Glare Screen
Apr�t 9, 2012
In this section, "tension cable" and "cable" are deleted
8 3(3) Posts
The �rst sentence m the �rst paragraph is revised to read
Posts shall be constructed in accordance with the Standard Plans and applicable provisions of
Section 8-12 3(1)A
The last paragraph is revised to read
All round posts for Type 1 Design B and Type 2 glare screen shall be fitted with a watertight
top securely fastened to the post Line posts shall have tops designed to carry the top tension
wire
8 3(5) Tensson Cables
This sections content includmg title is deleted
8 3(6) Fittings, Attachments, and Hardware
This sections content including title is deleted
Section 8-29, Wire Mesh Slope Protection
January 7, 2013
This section is deleted in its entirety and replaced with the follow�ng
8-29 Wire Mesh Slope Protect�on
8-291 Description
This Work consists of furn�shmg and �nstalling the anchors and the wire mesh slope protection in
accordance with these Spec�fications and the details shown in the Plans and m conformity with the
lines and dimensions shown m the Plans or established by the Engineer
r� L
�
�
�
�
�
�
��
�
�
�
,
�
C J
,
�
�
�
AMENDMEPITS TO THE 2072 STANDARD SPECIFICATIONS BOOK Page 56
Revlsed 8/27J13 ,
���
L_.1
� 8-29 2 Materials
Materials shall meet the requirements of Section 9 4
� 8-29 3 Construction Requirements
8-29 3(1) Subm�ttats
The Contractor shall submit a wire mesh slope protection plan to the Pro�ect Engineer a
' minimum of seven calendar days prior to beginnmg the work The wire mesh slope protection
plan shall include the following
���
II
�1
�
�
�
LJ
,
2
3
Plan sheets for anchor layout and installation, and the equipment and process used
to confirm the capaaty of the constructed anchors including the calibration data for
the stressing devices used to proof test the anchors, as completed by an
independent testing laboratory within 60 calendar days of the wire mesh slope work
Working drawings for the temporary yoke or load frame to be used for anchor proof
testing in accordance with Section 6-01 9
Plans and detads for assembiing wire mesh and erecting the assembled mesh on the
slope
All costs for the Work required for Submittals shall be incfuded in the unit Bid price detaded in
Section 8-29 5
8-29 3(2) Anchors
The Contractor shall mstall anchors of the type shown in the Plans and in conformance� with
the layout shown in the Wire Mesh Protection Plan as described �n Section 8-29 3(1) The
spacmg and number of the anchors and wire ropes as shown in the Plans are approximate
only, and upon rev�ew of the wire mesh slope protection plan, the Engineer may arrange the
spacing to better hold the wire mesh against the slope Backfill material shall be thoroughly
compacted with a mechanical compactor
The Contractor shall proof test up to 25 percent of the anchors in vertical pullout to the
� minimum allowable anchor capacity specified in the Plans Proof testing of anchors shall be
performed against a temporary yoke or load frame No part of the temporary yoke or load
frame shall bear within three feet of the anchor being tested For vertical pullout proof testing,
' an anchor is acceptable if it sustains the specified capacity for 10 minutes with no loss of load
Anchors that fail this criterion shali be replaced and retested if more than three anchors fad,
the Contractor shall proof test all anchors
�
'
�
'
r-1 I
8-29 3(3) Wire Rope
All wire rope loops shall include a thimble No wire rope splicing will be alfowed
8-29 3(4) Wire Mesh
The wire mesh shall be fastened to the completed wire rope assembly as shown in the Plans
High tensde steel fasteners on the vertical seams shall be staggered across width of the seam
Horizontal spiices �oirnng 2 rolls of inesh shall be made by overlapping the mesh
approximately 3 feet and either weaving 3 rows of lacing wires through every mesh opernng or
using 4 rows of high tensde steel fasteners placed on approximately 3-inch spacing Ail top
and bottom laps shall be made by folding the mesh to the outside, away from the slope, to
avoid the possibility of fallmg material hanging up in the folds The bottom of the mesh shall be
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 57
' Revised 8/27/13
located as shown in the Plans The ends of all lacing wires shall be secured to the mesh with a
m�nimum of 1'h-turns
The wire mesh shali not be tensioned in any direction, but is to remain loose so as to mcrease
its dampening effect on rolling rocks The Contractor shall use care in the handiing and
installing of the wire mesh and wire rope Any mesh or wire rope damaged due to the
Contractor's operations shall be replaced by the Contractor at no expense to the Contracting
Agency
8 4 Measurement
Measurement of anchors wdl be per each for the completed anchor Anchor types wdl not be
differentiated
Wire mesh slope protection will be measured by the square foot of wire mesh erected on the slope
There will be no deduction made for overlappmg the wire mesh material as required for splices or
for coverage due to variations m the slope or ground conditions
8 5 Payment
Payment will be made in accordance with Section 1-04 1, for each of the following Bid items that
are included in the Proposal
"Wire Mesh Slope Protection Anchor", per each
The unit Contract price per each for "Wire Mesh Slope Protection Anchor" shall be full
payment for all costs for the Work described in Sections 8-29 3(1) and 8-29 3(2)
"Wire Mesh Slope Protection", per square foot
The unit Contract price per square foot for "Wire Mesh Slope Protection" shall be fuli payment
for all costs for the Work described in Section 8-29 3(3) and 8-29 3(4)
Section 9-02, Betumanous Materaals
August 5, 2013
In this section, "Asphalt Emulsion" is revised to read "Emulsified Asphalt"
9 1 Asphalt Mater�al, General
In this section, "Cationic Emulsified Asphalt° is revised to read "Emuisified Asphalt"
The first paragraph is revised to read
Asphalt furnished under these Specifications shall not have been distdled at a temperature
high enough to produce flecks of carbonaceous matter, and upon arrival at the Work, shail
show no signs of separation into lighter and heavier components
�
I�
�
'
�
�_
'
'
�
�
�
'
,
�
�
LJ
�
'
C'
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 58
Revised 8/27/13 '
'
'
�
'
�
'
�
'
�
� �
U
�
LJ
'
� �
'
�
'
'
9-02 1(6) Cat�onic Emulsi�ed Asphalt
The "Cationic Emulsified Asphalt Table" is revised to read
Cationic Emulsified Asphalt Table
Rapid Set�ng Medium 3ettrng Slow Settlng
TYpe CRS-1 CFtS-Z CMS-2S CMS-2 CMS-2h CSS-1 CSS-1h
AASHTO Test
Grade Method Min Mau Min Max Min Max Min Max Min �Aax Min Max Min Max
Tests on
Emulsified
Asphalts
Viscosity SFS T 59 20 100 20 100
@ 77°F (25°C)
Viscosity SFS T 59 20 100 150 400 50 450 50 450 50 450
@ 122°F
(50°C)
Storage T 59 1 1 1 1 1 1 1
stabdity
test 1 day %
Demulsibdity
35 ml
0 8% sodwm
dioctyl
sulfosuccinate T 59 40 40
,%
Particle 59 Pos Pos Pos Pos Pos Pos Pos
charge test
Sieve Test, % 59 10 0 10 10 0 10 10 10 10
Cement T 59 2 0 2 0
mixing test, %
Distdlation
Od distdlate
by vol T 59 3 1 5 3 20 12 12
of emulsions
%
Residue, % T 59 60 65 60 65 65 57 57
Tests on
residue from
distdlation
tests
Penetration, T 49 100 250 100 250 100 250 100 250 40 90 100 250 40 90
77°F (25°C)
Ductitity, 77°F
(25°C) T 51 40 40 4Q 40 40 40 40
5 cm/mm , cm
AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Page 59
' Rev�sed S/27/13
Catiornc Emulsified Asphalt Table
Rap�d Settmg AAedium Settmg Slow Se�dng
Type CRS-1 CRS-2 CMS-2S CMS-2 CAAS-2h CSS-1 CSS-1 h
AASHTO Test
Grade Msthod Min Max �flin Max. M�n Max Min Max. Min Max Mm Max Mir� AAax
Solubihty in
trichloroethyle T 44 97 5 97 5 97 5 97 5 97 5 97 5 97 5
ne, %
The demuls�bdity test shall be made withm 30 days from date of shipment
If the particle charge test for CSS-1 and CSS-1 h is inconclusive, matenal having a max�mum pH value of 6 7 wdl be
acceptable
9-02 1(6)A Polymerized Cation�c Emuls�fied Asphalt CRS-2P
The first paragraph (except for the table) is rev�sed to read
CRS-2P shali be a polymerized cationic emulsified asphalt The polymer shall be mdled into
the asphalt or emulsion durmg the manufactur�ng of the emulsified asphalt CRS-2P shall meet
the foflowmg requirements
Footnote 1 below the table is revised to read
�
'
,
'
�
�
,
�
1 D�stdlation modified to use 300 grams of emulsified asphalt heated to 350°F ± g°F and �
maintained for 20 minutes
9 1(8) Flexible Bitum�nous Pavement Marker Adhesive
The fifth row in the table is revised to read
Ductility, 39 2°F, 1 cmlminute, cm AASHTO T 51 5 Min
9 4 Anti Additive
This section is revised to read
Anti-stripping additive shall be a product listed in the current WSDOT Qualified Products List
(QPL)
Section 9-03, Aggregates
August 5, 2013
9-03 1(1) General Requirements
The eighth paragraph is deleted
9 6 Aggregate for Asphait Treated Base (ATB)
This section inciuding title is deleted in its entirety and replaced with the following
Vacant
�
,
,
LJ
'� J
,
�
'
C l
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 60 ,
Revised 8/27/13
� �
�
9-03 8{4) Blending Sand
This sections includmg t�tle is revised to read
Vacant
,
LJ
�
�
�
'
�
�
9 Backfill for Sand Drains
This section is suppiemented with the following
That portion of backfill retained on a No 4 sieve shall not contain more than 0 05 percent by
weight of wood waste
9 13(1) Sand Drainage Blanket
The last paragraph is revised to read
That portion of backfili retamed on a No 4 sieve shall not contain more than 0 05 percent by
weight of wood waste
9 Gravel Borrow
Note' is deleted, including the reference in the table
9 Select Borrow
Note' is deleted
Note 2 is re-numbered Note', �ncludmg the reference in the table
9 14(4) Gravel Borrow for Geosynthetic Retain�ng Wail
This sect�on including title is revised to read
Gravel Borrow for Structural Earth Wall
, All backfill material within the remforced zone for structural earth walls shall consist of granular
material, either naturally occurring or processed, and shali be free draining, free from orgarnc
or otherwise deleterious material The material shall be substantially free of shale or other soft,
' poor durability particles, and shall not contain recycled materials, such as glass, shredded
tires, portland cement concrete rubble, or asphaltic concrete rubble The backfiil materiai shall
meet the following requirements for grading and quality
'
�
'
�
1
,
Geosynthetic Metall�c
Remforcement Reinforcement
S�eve S�ze Percent Passm Percent Passm
4 99-100
2 75-100
1 '/< " 99-100
1" 90-100
No 4 50-80 50-80
No 40 30 max 30 max
No 200 7 0 max 7 0 max
Sand E urvalent 50 mm 50 min
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 61
, Revised 8/2T/13
All percentages are by weight
Property Test Method Geosynthetic Metatl�c
Remforcement Re�nforcement
Re uirements Re mrements
Los Angeles Wear AASHTO T 96 35 percent max 35 percent max
500 rev
Degradat�on Factor WSDOT Test Method T 15 mm 15 mm
113
Resistiv�ty WSDOT Test Method T 3,000 ohm-cm,
417 mm
pH WSDOT Test Method 4 5-9 5-10
113
Chlorides AASHTO T 291 100 m max
Sulfates AASHTO T 290 200 m max
If the resistivity of the gravel borrow equals or exceeds 5,000 ohm-cm, the specified chloride
and sulfate limits may be waived
Wall backf�ll material satisfymg these grading and property requirements shall be classified as
nonaggressive
9 General Requirements
The first sentence in the first paragraph is revised to read
Hot Mix Asphalt, Concrete Rubble, Recycled Glass (glass cullet), and Steel Furnace Slag may
be used as, or blended uniformly with naturally occurnng materials for aggregates
9 21(1 �C Vacant
This section including title is revised to read
9-03 21(1 }C Recycled Glass (Glass Cuilet)
Glass Cullet shall meet the requirements of AASHTO M 318 w�th the additional requirement
that the glass cullet is limited to the maximum amounts set in Section 9-03 21(1)E for recycled
glass Prior to use the Contractor shall provide certification to the Pro�ect Engineer that the
recycled glass meets the physical properties and deleterious substances requirements in
AASHTO M-318
9 21(1) E Table on Maximum Allowable Percent (By Weight) of Recycled Material
In the table, the row contairnng the item "Aggregate forAsphalt Treated Base (ATB)" is deleted
The column heading "Recycled Glass" is revised to read "Recycled Glass (Glass Cullet) in the
table
In the column "Recycled Glass (Glass Cullet)" all amounts are revised to read "20" beginning with
the item "BallasY' and continuing down untd the last item in the table
�
�
'
�
�
AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Page 62
Revised 8/27/13 ,
r
�
,
�
'
Section 9-04, Jotnt And Crack Sealing Mater�als
January 7, 2013
9-04 2 Josnt Sealants
This section is supplemented with the followmg new sub-sections
9-04 2(3) Polyurethane Sealant
Polyurethane sealant shall conform to ASTM C 920 Type S Grade NS Class 25 Use M
Polyurethane sealant shall be compatible with the closed cell foam backer rod When
required, compatibdity characteristics of sealants in contact with backer rods shall be
determined by Test Method ASTM C 1087
9-04 2(3)A Closed Cell Foam Backer Rod
� Closed cell foam backer rod for use with polyurethane sealant shall conform to ASTM C 1330
Type C
'
�
,
'
'
�
9 Crack Sealing — Rubberized Asphalt
This section is deleted
9 Butyl Rubber and Nitrile Rubber
This sections number is revised to read
9-0410
Section 9-05, Drainage Structures, Culverts, and Condu6ts
January 7, 2013
9-05 0 Acceptance by Manufacturer's Certification
This section including title is revised to read
9-05 0 Acceptance and Approval of Drainage Structures, and Culverts
The Drainage Structure or Culvert may be selected from the Qualified Products List, or
submitted using a Request forApproval of Materials (RAM) in accordance with Section 1-�6
Certain drainage materials may be accepted by the Engineer based on a modified acceptance
' criteria when materials are selected from the Qualified Products List (QPL) The modified
acceptance criteria are defined in the QPL for each material
1 9-05 1(6) Corrugated Polyethylene Draen Pipe, Couplings, and Fittings (Up to 10
Inch)
This section is supplemented with the following
CI
,
�'�.J
'
Corrugated polyethylene dram pipe manufacturers shall participate in the National
Transportation Product Evaluation Program (NTPEP) work plan for HDPE (High Density
Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website displaying they
are NTPEP compliant
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 63
' Revised 8/27H 3
9-05 1(7) Corrugated Polyethylene Drain P�pe, Coupl�ngs, and Fittongs (12 Inch
Through 60 Inch)
This section is supplemented with the following
Corrugated polyethylene drain pipe manufacturers shall participate in the Nationai
Transportation Product Evaluation Program (NTPEP) work plan for HDPE (High Density
Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website displaymg they
are NTPEP compliant
9 2(7) Perforated Corrugated Polyethylene Underdrain Pipe (Up to 10 Inch)
This section is supplemented with the foliowing
Perforated corrugated polyethylene underdram pipe manufacturers shall participate in the
National Transportation Product Evaluation Program (NTPEP) work plan for HDPE (High
Density Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website
displaying they are NTPEP compliant
�
�
'
'
�J
i
9-05 2(8) Perforated Corrugated Polyethylene Underdra�n Pipe (12-Inch Through 60
Inch Diameter Maximum), Couplings, and Fitttngs ,
This section is supplemented with the following
PerForated corrugated polyethylene underdrain pipe manufacturers
National Transportation Product Evaluation Program (NTPEP) wor
Density Polyethylene) Thermoplastic Pipe and be listed on the
displaying they are NTPEP compliant
shall participate m the �
k plan for HDPE (High
NTPEP audit website
9 19 Corrugated Polyethylene Culvert Pipe, Couplings, and Fettings
The word "producer" is revised to read "manufacturer"
The second paragraph is revised to read
Joints for corrugated polyethylene culvert pipe shall be made with either a bell/bell or bell and
spigot coupling and shall incorporate the use of a gasket conforming to the requirements of
ASTM D 1056 Type 2 Class B Grade 3 or ASTM F 477 All gaskets shail be factory installed
on the coupling or on the pipe by the qualified manufacturer
This section is supplemented with the followmg
Corrugated polyethylene culvert pipe manufacturers shall partiapate in the National
Transportation Product Evaluation Program (NTPEP) work plan for HDPE (High Density
Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website displaymg they
are NTPEP compliant
9 20 Corrugated Polyethylene Storm Sewer Pipe, Couplings, and Fittings
The word "producer" is revised to read "manufacturer"
The first paragraph is revised to read
Corrugated polyethylene storm sewer pipe, coupiings, and fittings shall meet the �equirements
of AASHTO M 294 Type S or D The maximum pipe diameter for corrugated polyethylene
storm sewer pipe shall be the diameter for which a manufacturer has submitted Fittmgs shall
be blow molded, rotational molded, or factory welded
'
�
u
,
�
'
'
'� J
'
'
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 64
Rewsed 8/27/13 '
r
�
This section is supplemented with the following
pipe manufacturers shall partiapate m the National
n Program (NTPEP) work plan for HDPE (High Density
and be listed on the NTPEP audit website displaying they
Corrugated polyethylene culvert
, Transportation Product Evaluatio
Polyethylene) Thermopiastic Pipe
are NTPEP compliant
,
'
I�
9-05 24 Polypropylene Culvert Pipe, Polypropylene Storm Sewer Pipe, and
Polypropylene Sanitary Sewer Pipe
This sections content is deleted and replaced with the following
All �oints for polypropylene pipe shall be made with a bell/bell or bell and spigot coupling and
shall conform to ASTM D 3212 using elastomeric gaskets conforming to ASTM F 477 All
gaskets shall be factory mstalled on the pipe in accordance with the producer's
recommendations
' Qualification for each producer of polypropylene storm sewer pipe requires �oint system
conformance to ASTM D 3212 using elastomeric gaskets conforming to ASTM F 477 and a
formal quality control plan for each plant proposed for consideration
'
�
'
LJ
�
�
'
�1
�
'
'
'
A Manufacturer's Certif�cate of Compliance shall be required and shall accompany the
materials delivered to the pro�e�t The certificate shall clearly identify production lots for all
materials represented The Contracting Agency may conduct verification tests of pipe stiffness
or other properties it deems appropriate
This section is supplemented with the foltowmg new sub-sections
9-05 24(1) Polypropylene Culvert Pipe and Storm Sewer Pipe
Polypropylene culvert and storm sewer pipe shall conform to the following requirements
For dual wall pipe sizes up to 30 inches ASTM F2736
2
3
4
For tnple wall pipe sizes from 30 to 60 inches ASTM F2764
For dual wall profile pipe sizes 36 to 60 inches AASHTO MP 21, Type S or Type D
Fittmgs shall be factory welded, in�ection molded or PVC
9-05 24(2) Polypropylene Sanitary Sewer Pipe
Polypropylene sanitary sewer pipe shall conform to the followmg requirements
For pipe sizes up to 30 mches ASTM F2736
2
3
For pipe sizes from 30 to 60 inches ASTM F2764
Fittings shall be factory welded, in�ection molded or PVC
AMENDMENTS TO THE 2012 STANDARD SPECiFICATiONS BOOK Page 65
1 Revised 8/27/13
Sect�on 9-06, Structural Steel and Related Materials
April 1, 2013
9-06 5(3) High Strength Bolts
In this section, "AASHTO M 291" is revised to read "ASTM A 563", "AASHTO M 164" is revised to
read uASTM A 325", "AASHTO M 293" is revised to read "ASTM F 436", "AASHTO M 253" is
revised to read "ASTM A 490", and "AASHTO M 298" is revised to read "ASTM B 695"
9 5(4) Anchor Bolts
In this section, "AASHTO M 291" is revised to read "ASTM A 563"
Section 9-07, Reinforcing Stee!
August 6, 2012
9-07 7 Wire Mesh
The first sentence in the first paragraph is revised to read
Wire mesh for concrete reinforcement shall conform to the requirements of AASHTO M 55,
Welded Steel Wire Fabric for Concrete Re�nforcement orAASHTO M 221, Steel Welded Wire
Reinforcement, Deformed for Concrete
Section 9-10, Pileng
Apr�l 2, 2012
9-10 4 Steel Pile T�ps and Shoes
In the first paragraph "ASTM A 148 Grade 60 is revised to read "ASTM A 148 Grade 90
Section 9-13, Riprap, Quarry Spalls, Slope Pro$eetion, & Rock for Eroseon and Scour
Protection and Rock Walls
April 1, 2013
9-13 5(1) Semi-Open Concrete Masonry Units Slope Protection
In this section, "ASTM C 90" is revised to read "ASTM C 1319"
Section 9-14, Eros�on Control and Roadside Planting
August 5, 2013
9-14 3 Fert'lizer
The second sentence in the first paragraph is revised to read
It may be separate or in a mixture containmg the percentage of total nitrogen, avadable
phosphoric acid, and water-soluble potash or sulfur in the amounts specified
9 4(2) Hydraulically Applied Erosaon Control Products (HECPs )
The first sentence in the third paragraph is revised to read
Ali HECPs shall be furnished premixed by the manufacturer with Organic or Synthetic Tackifier
as specified in Section 9-14 4(7)
�
�
�
I��
L
u
LJ
'
I�
�
'
�
'
�
�
�
'
�
'
�I
L �
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 66
Rev(sed 8/27/13 1
'
,
�
,
'
,
�
�
'
�
u
'
�
The third and fourth rows in Table 1 is revised to read
Heavy Metals EPA 6020A Total Metals Antimony — < 4 mg/kg
Arsemc — < 6 mg/kg
Bar�um — < 80 mg/kg
Boron — < 160 mg/kg
Cadtmum — < 2 mg/kg
Total Chrom�um — < 4 mg/kg
Copper — < 10 mg/kg
Lead — < 5 mg/kg
Mercury — < 2 mg/kg
Nickel — < 2 mg/kg
Selenium — < 10 mg/kg
Strontium — < 40 mg/kg
Zinc — < 30 m
Water Hold�ng ASTM D 7367 800 percent mmimum
Ca acity
9-14 4(2)A Long Term Mulch
In the first paragraph, the phrase "withm 2 hours of application" is deleted
9 4(4) Wood Strand Mulch
The last sentence in the second paragraph is deleted
This section is supplemented with the following new paragraph
The Contractor shall provide Material Safety Data Sheet (MSDS) that demonstrates that the
product is not harmful to plant life and a test report performed in accordance with WSDOT Test
Method 125 demonstrating compliance to this specification prior to acceptance
9 4(8} Cornpost
The second paragraph is revised to read
Cornpost production and quality shall comply with WAC 173-350 and for biosolids composts,
WAC 173-308
The third paragraph is to read
Compost products shall meet the following physical criteria
1 Compost material shall be tested m accordance with U S Compostmg Councd
' Testing Methods for the Examinat�on of Compost and Composting (TMECC) 02 02-B,
"Sample Sieving forAggregate Size Classification"
' Fine compost shall meet the following gradation
'
�
�
S�eve S�ze Percent Pass�n
Mmimum Max�mum
1" 100
/ 90 100
'/<" 75 100
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 67
, Revised 8/27/13
Note Maximum particle length of 4 inches
Medium compost shall meet the following gradation
Sieve Size Percent Passm
Mm�mum Max�mum
1" 100
/ 85 100
'/a" 70 85
Note Maximum particle length of 4 inches Medium compost shall have a carbon to
rntrogen ration (C N) between 18 1 and 35 1 The carbon to nitrogen ration shall
be calculated usmg dry weight of "Organic Carbon" using TMECC 04 01A
divided by the dry weight of "Total N" using TMECC 04 02D
Coarse compost shall meet the foilowing gradation
S�eve S�ze Percent Passm
Mm�mum Maximum
2" 100
1" 90 100
'/a" 70 100
'/o" 40 60
Note Maximum part�cle length of 6 inches Coarse compost shall have a carbon to
rntrogen ratio (C N) between 25 1 and 35 1 The carbon to nitrogen ratio shall be
calculated usmg the dry weight of "Organic Carbon" using TMECC 04 01A
divided by the dry weight of "Total N" usmg TMECC 04 02D
2 The pH shall be between 6 0 and 8 5 when tested m accordance with U S
Compostmg Council TMECC 04 11-A, "1 5 Slurry pH"
3 Physical contammants, defined in WAC 173-350 (plastic, concrete, ceramics, metal,
etc ) shall be less than 0 5 percent by weight as determined by U S Composting
Council TMECC 03 08-A "Classification of Inerts by Sieve Size"
4 Mirnmum organic matter shall be 40 percent by dry weight basis as determined by
U S Compostmg Council TMECC 05 07A "Loss-On-Ignition Organic Matter Method
(LOI)"
�
�
7
Soluble salt contents shall be less than 4 0 mmhos/cm when tested in accordance
with U S Cornpostmg Councd TMECC 04 10 "Electrical Conduct�vity"
Maturity shal! be greater than 80 percent in accordance with U S Composting
Council TMECC 05 05-A, "Germination and Root Elongation"
Stabdity shall be 7-mg CO2—C/g OM/day or below in accordance with U S
Composting Council TMECC 05 08-B "Carbon Diox�de Evolution Rate"
8 The compost product shall originate from organic feedstocks as defined in WAC 173
350 as "Wood waste", "Yard debris", "Post-consumer food waste", "Pre-consumer
animal-based wastes", and/or "Pre-consumer vegetative waste" The Contractor shali
provide a I�st of feedstock sources by percentage in the final compost product
9 The Engineer may also evaluate compost for maturity usmg U S Composting
Council TMECC 05 08-E "Solvita� Maturity Index° Fine compost shall score a
number 6 or above on the Solvita� Compost Maturity Test Medium and Coarse
compost shall score a 5 or above on the Soivita� Compost Matunty Test
�
�J
�
I ��J
LJ
'
1
��
C''
LJ
�
,
LJ
,
�
�
'
'
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 68
Revised 8/27/13 �
'
'
,
'
9 4(8)A Compost Approval
This section's title is revised to read
9-14 4(8)A Compost Subm�ttal Requ�rements
The first sentence in this section up until the colon is revised to read
The Contractor shall submit the following information to the Engineer for approval
Item No 2 m the first paragraph is revised to read
' 2 A copy of the Solid Waste Handling Permit issued to the manufacturer by the
Jurisdictional Health Department in accordance with WAC 173-350 (Mirnmum Functional
Standards for Solid Waste Handlmg) or for biosolid composts a copy of the Coverage
' Under the General Permit for Biosolids Management issued to the manufacturer by the
Department of Ecology in accordance with WAC 173-308 (Biosolids Management)
,
�
,
�
LJ
9 5 Eros�on Control Devices
This section is supplemented with the following new sub-section
9-14 5(9) High Visibility Silt Fence
High visibdity sdt fence shall be a minimum of 5 feet in height, high visibdity orange, UV
stabdized and shall meet the geotextile requirements �n Section 9-33 Table 6 Support posts
shall be in accordance with the Standard Plans The posts shail have sufficient strength and
durabdity to support the fence through the life of the pro�ect
9 5(1) Polyacrylamide (PAM)
The fourth sentence is replaced with the following finro new sentences
The mmimum average molecular weight shall be greater than 5-mg/mole The charge density
shali be no less than 15 percent and no greater than 30 percent
9 5(2) Erosion Control Blanket
This section mcludmg title is deleted m its entirety and replaced with the following
� 9-14 5(2) Biodegradable Erosion Control Blanket
B�odegradable erosion control blankets shal{ be made of natural plant fibers, and all nettmg
mater�al, if present, shall biodegrade within a life span not to exceed 2 years
'
'
,
�
'
�
The Contractor shall provide independent test results from the Nationai Transportation Product
Evaluation Program (NTPEP) meeting the requirements of Section 9-14 5(2)B, 9-14 5(2)C and
9-14 5(2)D
9-14 5(2)A Approval and Acceptance of Biodegradable Erosion Control Blankets
The erosion control bianket may be selected from the Qualified Products List, or
subm�tted using a Request for Approval of Materials (RAM) m accordance with Section 1-
06 Erosion control blankets may be accepted by the Engineer based on the modified
acceptance criteria when materials are selected from the QPL The modified acceptance
critena are defined in the QPL for each material
AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Page 69
, Revised 8/27/13
9-14 5(2)B Biodegradable Erosion Control Blanket for Slopes Steeper than 3 1
(H V)
Table 6
Requirements for Slopes
Propert�es ASTM Test Method Steeper than 3 1
Protecting Slopes from ASTM D 6459 C factor = 0 04 maximum for
Rainfall-induced Erosion cumulative R-Factor<231
Sod tested shall be sandy
loam as defined by the
NRCS**
Soil Texture Triangle
Mass Per Unit Area ASTM D 6475 7 6 oz /sq yd minimum
L�ght Penetration ASTM D 6567 44 % max�mum
Tensile Strength MD x XD* ASTM D 6818 10 0 x 6 0 pounds/inch minimum
Tens�le Elongation MD x XD* ASTM D 6818 38°/a x 33% maximum
*MD is Machine Design and XD is Cross Direction
**Natural Resource Conservation Services
9-14 5(2)C Biodegradable Erosion Contro! Blanket for Slopes Flatter than 3'0(H V)
Table 7
Slope Flatter than 3 1
Propertses ASTM Test Method Requirements
Protectmg Slopes from ASTM D 6459 C factor = 0 15 maximum for
Ramfall-Induced Erosion cumulative R-Factor<231
Soil tested shall be sandy
loam as defined by the
NRCS**
Soil Texture Triangle
Mass Per Unit Area ASTM D 6475 7 6 oz /sq yd minimum
Light Penetration ASTM D 6567 40% maximum
Tensde Strength MD x XD* ASTM D 6818 6 5 x 2 3 pounds/inch minimum
Tensde Elongation MD x XD* ASTM D 6818 38% x 33% maximum
*MD is Machine Design and XD is Cross Direction
*"Natural Resource Conservation Services
'
�
�
'
�
'
�
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 70
Revised 8/27/73 '
'
9-14 5(2)D Biodegradable Erosion Control Blanket for D�tches
�
'
�
�
�
,
�
�
C
,
�
'
�
�
1
�
LJ
Table 8
Properties Test Method Requirements
Performance in Protecting ASTM D 6460 Limiting Shear (T�, = 2 0 psf
Ea�then Channels from Sod tested shall be sandy minimum
Stormwater-Induced Erosion loam as defined by the
NRCS*" Limiting Velocity (V�, = 7 5 ft/sec
Sod Texture Triangle flow minimum
Mass per Unit Area ASTM D 6475 7 4 oz / sq yd minimum
Light Penetration ASTM D 6567 65 % maximum
Tensde Strength MD x XD* ASTM D 6818 9 6 x 3 2 ibs/inch minimum
Tensde Elongation MD x XD* ASTM D 6818 38% x 33% maximum
*MD is Machine Design and XD is Cross Direct�on
**Natural Resource Conservation Services
9 5(3) Clear Plastic Covering
This section including title is revised to read
Plast�c Covering
Plastic covering shall meet the requirements of ASTM D 4397 for polyethylene sheeting
9 5(4) Geotextile Encased Check Dam
This section including title is revised to read
9-14 5(4) Check Dams
All materials used for check dams shall be non-toxic and not pose a threat to wildiife when
mstalled
This section is supplemented with the following new sub-sections
9-14 5(4)A B'odegradable Check Dams
Biodegradable check dams shall meet the following requ�rements
Biodegradable Check Dams Materials
Wattle Check Dam 9-14 5(5)
Compost Sock Check Dam 9-14 5(6)
Coir Log Check Dam 9-14 5(7)
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 71
, Revised 8/27h 3
The Contractor may substitute a different biodegradable check dam as long as it complies with �
the following and is approved by the Engineer
1
Made of natural plant fiber
�
2
Netting if present shall be biodegradable
3 Straw bales shall not be used as check dams
9-14 5(4)B Non-b�odegradable Check Dams
Non-biodegradable check dams shall meet the followmg requirements
1 Geotextile matenals shall conform to section 9-33 for silt fence
�
�
�
2 Other such devices that fulfill the requirements of section 9-14 5(4) and shall be
approved by the Engineer prior to installation '
9 5(5j Wattles
The second sentence in the first paragraph is revised to read
Wattle shall be a minimum of 8-inches m diameter
The first sentence in the second paragraph is revised to read
Compost filler shall be Medium Compost and shall meet the material requirements as
specified in Section 9-14 4(8)
The last paragraph is revised to read
Wood stakes for wattles shall be made from untreated Douglas fir, hemlock, or pine species
Wood stakes shall be 2 by 2-mch nominal dimension and a mmimum 24 inches in length
9-14 5(6) Compost Socks
In this section, "Coarse ComposY' is revised to read "Medium Compost"
The last paragraph is revised to read
Wood stakes for compost socks shall be made from untreated Douglas fir, hemlock, or pine
species Wood stakes shall be 2 by 2-inch nominal dimension and a minimum 24 inches in
length
9 5(8) High Visibility Fenc�ng
The first paragraph is revised to read
High visibdity fence shall be UV stabilized, orange, high-density polyethyiene or polypropylene
mesh
9 Description
In item No C in the fourth paragraph, "22-inch" is rev�sed to read "2-mch"
�
�
�
e
'
C �'
,
�
'� 1
�
�
'
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 72
Rev�sed 8/27H3 '
'
'
�
,
1
,
'
�
'
�
1
�
'
�
�
Section 9-15, IrrigatAOn System
April 1, 2013
9-15.1(2) Polyv�nyl Chloride Pipe and Fittings
In the first paragraph, "ASTM D 1784" is revised to read "ASTM D 1785"
Section 9-16, Fence and Guardra�l
August 5, 2013
9-16.1(1)A Post Material for Chain Lonk Fence
The first paragraph is revised to read
Except as noted otherwise, post material shail conform to the requirements of AASHTO M
181, Type 1(zinc-coated steel), Grade 1 or 2, and shall mclude all round and roll-formed
material (line posts, brace posts, end posts, corner posts, and pull posts)
The last sentence in the fourth paragraph is deleted
9 1(1 jC Tension Were and Tension Cable
This section including title is revised to read
9-16 1(1)C Tens�on Wire
Tension wire shall meet the requirements of AASHTO M 181 Tension wire galvarnzing shall be
Class 1
9 1(1)D F�ttings and Hardware
The second sentence in the first paragraph is deleted
The last paragraph is deleted
9-16 1(2) Approval
This section is deleted
9 2(2) Approval
This section is deleted
9 3(2) Posts and Biocks
The first sentence in the first paragraph is revised to read
Posts and blocks may be of creosote, pentachlorophenol, waterborne chromate copper
arsenate (CCA), or ammornacal copper zinc arsenate (ACZA), treated timber, or galvanized
steel (galvanized steel posts only — no blocks)
The following reference is deleted from the third paragraph
' ACA
�
�
0 50 Ibs pcf
The sixth paragraph is deleted
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 73
' Revised 8127/73
1
9-16 4(2) Wire Mesh
This section is revised to read
The galvanized wire mesh shall be a Style 1 double-twisted hexagonal mesh conformmg to
ASTM A 975 with 8 by 10 opening, except when a colorized, polyvinyl chioride coating is
required then the Style shall be a Style 3
The longitudinal edges of the wire mesh fabnc shall have knuckled selvedges with continuous
selvedge wire as specified in ASTM A 975
9 4(3) Wire Rope
This section is revised to read
Wire rope shall be �/<- inch-diameter, independent wire rope class (IWRC) 6x19, extra
improved plow steel (EIP) wire rope galvanized in accordance with ASTM A1023 Each lot of
wire rope shall be accompanied by a Manufacturer's Certificate of Compliance, a mdl
certificate, and a test report showing the wire rope meets the mirnmum breaking force
requirements of ASTM A 1023
9 4(4) Hardware
Th�s section is revised to read
Weldless steel rings shall be drop-forged steel and heat treated after forging, have a single
pull, working load limit of at least 10,000 Ibs, and meet performance requirements of Federal
Spec��cation RR-C-271 D Type VI
Thimbles required for all wire rope loops shall be standard weight, galvanized, and meet
perFormance requirements of Federal Specification FF-T 276b Type II
Wire rope clips shall have drop-forged steel bases, be galvanized, and meet performance
requirements of Federal Specification FF-C-450 Type I Class 1
9 4(5) Hog Rings and Tse Wire
This section includmg title is revised to read
9-16 4(5) Fasteners and Lacing Wire
Fasteners shall consist of 11 gauge high tensde steel Lacing wire shall consist of 9 gauge,
zmc-coated steel wire conforming to ASTM A 641
9 4(6) Grout
This section including title is deleted
9 4(7) Anchor
This section inciuding title and section number is revised to read
9-16 4(6) Ground Anchors
Threaded bar ground anchors shall be deformed, continuously threaded, steel reinforcement
bars conformmg to either Section 9-07 2 or Section 9-07 11 Threaded bar ground anchors
shall be either epoxy-coated in accordance with Sections 6-02 3(24)H and 9-07 3 or
galvarnzed after fabrication m accordance with ASTM A 767 Class I
'
�L 1
1
'
'
'
�
'
�=J
'
�
1
'
��
'
I
,;
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 74 '
Revised 8/27/13 ,
�
Hollow-core anchor bars shall have continuous threads/deformations and be fabricated from
' steel tubing conforming to ASTM A 519 Couplers and nuts shall provide 100% of the
guaranteed mmimum tensde strength of the hollow core anchor bars
�
�
�
�
�
'
l9
�
'
�
Bearing plates shall conform to ASTM A 572 Grade 50 and shall be galvanized after
fabrication in accordance with AASHTO M 111 Nuts shall conform to either AASHTO M 291
Grade B, hexagonal, or Section 9-0711 Nuts shall be galvanized after fabrication in
accordance with AASHTO M 111 for plate washers and AASHTO M 232 for ail other hardware
Grout for ground anchors shall be Grout Type 2 for Nonshrink Applications, conforming to
Sectian 9-20 3(2)
Concrete for soil anchor deadmen shall be either commercial concrete conformmg to Section
6-02 3(2)B or Class 3000 conformmg to Section 6-02
Steel remforcing bars for sod anchor deadmen shall conform to Section 9-07 2, and shall be
epoxy-coated in accordance with Sections 6-02 3(24)H and 9-07 3
9 6(3) Posts
This sect�on is revised to read
Lme posts for Types 1 and 2 glare screens shall be 2 inch inside diameter galvarnzed steel
pipe with a nominal we�ght of 3 65 pounds per Imear foot End, corner, brace, and pull posts
for Type 1 Design A and B and Type 2 shall be 2'/z inch inside diameter galvanized steel pipe
with a nominal weight of 5 79 pounds per Imear foot Infermediate puil posts (braced line
posts) shall be as specified for line posts
The base material far the manufacture of steel pipes used for posts shall conform to the
requirements of ASTM A 53, except the weight tolerance on tubular posts shall be applied as
provided below
Posts provided for glare screen will have an acceptance tolerance on the weight per linear
foot, as specified, equal to plus or minus 5 percent This tolerance will apply to each individual
post
All posts shall be galvanized in accordance with AASHTO M 181 Section 32 The minimum
� average zinc coating is per square foot of surface area This area is defined as the totai area
ms�de and outside A sample for computmg the average of mass of coatmg is def�ned as a 12-
inch piece cut from each end of the galvanized member
�
1
'
9-16.6(5) Cable
This section includmg title is revised to read
9-16 6(5) Vacant
9 6(6) Cable and Tension W�re Attachments
This section including title is revised to read
9-16 6(6) Tension W�re Attachments
� All tension wire attachments shall be galvarnzed steel conforming to the requirements of
AASHTO M 232 unless otherwise specified Eye bolts shall have either a shoulder or a back-
'
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 75
� Revised 8/27/13
up nut on the eye end and be provided with an eye nut where needed or standard hex nut and
lock washer 3 /8-mch diameter for tension wire and of sufficient length to fasten to the type of
posts used Turnbuckles shail be of the shackle end type, '/ inch diameter, with standard take-
up of 6 mches and provided with s/ inch diameter pins
9 6(9) Fabric Bands and Stretcher Bars
The first paragraph is revised to read
Fabric bands shall be %8 inch by 1 inch nominal Stretcher bars shail be % inch by 3 /4 inch
nommal or 5 / 16 mch diameter round bar nominal A 5 / 16 inch diameter round stretcher bar shall
be used with Type 1 Nominal shall be construed to be the area of the cross section of the
shape obtamed by multiplying the specified width by thickness A variation of minus 5-percent
from this theoretical area shall be construed as "nommal" size All shall be galvanized to meet
the requirements of ASTM F 626
9 7 Vacant
This section including title is deleted in its entirety
9 8 Weathering Steel Beam Guardrail
This section including title is deleted in its entirety
Section 9-18, Precast Traffic Curb and Block Traffic Curb
August 6, 2012
This section's title is revised to read
9-18 Precast Traffic Curb
9 Block Traffec Curb
This section mcludmg title is revised to read
9-18 3 Vacant
Section 9-20, Concrete Patching Material, Grout, and Mortar
January 2, 2012
9-20.3(3) Grout Type 3 for Unconfined Bearing Pad Applications
This section is revised to read
Grout Type 3 shali be a prepackaged material meeting the requirements of ASTM C 928 —
Table 1, R2 Concrete or Mortar
9 3(4) Grout Type 4 for Multipurpose Applicat�ons
In the third sentence of the first paragraph, the reference "0 40" is revised to read "0 45"
Sectoon 9-23, Concrete Curing Materials and Admixtures
August 5, 2013
9-23 2 Liquid Membrane-Forming Concrete Cureng Compounds
In the first paragraph, "moisture loss" is revised to read "water retention"
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 76 �
Rewsed 8/27/13
'
9-23.6(9) Type S Specefic Performance Admixtures
� The first sentence is revised to read the following two new sentences
Type S Specific Performance admixtures are limited to ASR-mitigating, viscosity modifying,
� shrmkage reducmg, rheology-controlling, and workability-retaming admixtures They shall
conform to the requirements of ASTM C 494 Type S
�
'
�
�
Section 9-26, Epoxy Resms
August 5, 2013
9-26 3(1)A Traffic Bearing Applications
The first sentence m the first paragraph is revised to read
Epoxy grout/mortarlconcrete for traffic bearing applications shall have a 7-day compressive
strength of not less than 4,000 psi when tested in accordance with ASTM C 579
Section 9-28, S�gnmg Materials and Fabrication
April 1, 2013
9-28 14(2) Steel Structures and Posts
' "AASHTO M 291" is revised to read "ASTM A 563" and "AASHTO M 293" is revised to read "ASTM
F 436"
�
�,
�
�
�
'
'
'
'
'
l
Section 9-29, Illumination, Signal, Electricai
August 5, 2013
9-29 1(4) Non-Metalloc Conduit
This section is supplemented with the followmg new sub-section
9-291(4)D Deflection Fittings
Deflection Fittings for use with rigid PVC conduit shall be as described in 9-29 1(2)A
9 2 Junction Boxes, Cable Vaults, and Pull Boxes
The section is supplemented with the followmg
The Contractor shall perform quality control inspection The Contracting Agency intends to
perform Qual�ty Assurance Inspection By its mspection, the Contracting Agency mtends only
to verify the quatity of that Work This inspection shall not relieve the Contractor of any
responsibdity for identifymg and replacing defective material and workmanship Prior to the
start of production of the precast concrete units, the Contractor shall advise the Eng�neer of
the production schedule The Contractor shall give the Inspector safe and free access to the
Work If the Inspector observes any nonspecification Work or unacceptable quality control
pract�ces, the Inspector will advise the plant manager If the corrective action is not acceptable
to the Engineer, the urnt(s) wdl be re�ected
9 2(1) Standard Duty and Heavy Junction Boxes
The third paragraph is deleted and replaced with the following new paragraphs
The Contractor shall provide shop drawmgs for all components, hardware, lid, frame,
reinforcement, and box dimensions The shop drawings shall be prepared by (or under the
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 77
' Rewsed 8/27H3
supervision ofl a Professional Engmeer, licensed under Title 18 RCW, State of Washington, in
the branch of Civil or Structural, and each sheet shall mclude the following
2
3
Professionai Engineer's origmal signature, date of signature, original seal,
registration number, and date of expiration
The inrtials and dates of all participating design professionals
Clear notation of all revisions including identification of who authorized the revision,
who made the revision, and the date of the revision
4 Design calculations shall carry on the cover page, the Professional Engineer's
original signature, date of signature, original seal, registration number, and date of
expiration
For each type of �unction box, or whenever there is a change to the Junction box design, a
proof test, as defined in th�s Specification, shall be performed and new shop drawings
submitted
9 2(1)A Standard Duty Junct�on Boxes
The first paragraph is supplemented with the following
All Standard Duty Junction Boxes placed in sidewalks, walkways, and shared use paths shall
have slip resistant surfaces Non-siip lids and frames shall be hot dip galvarnzed m
accordance with AASHTO M 111
The sub-paragraph's titled "Concrete Junction Boxes" are revised to read
Concrete Junction Boxes
The Standard Duty Concrete Junction Box steel frame, lid support, and lid shall be painted
with a black paint containing rust inhibiters or pamted with a shop applied, inorganic zinc
primer in accordance with Section 6-07 3, or hot-dip galvarnzed in accordance with AASHTO
M 111
Concrete used in Standard Duty Junction Boxes shall have a mmimum compressive strength
of 6,000 psi when reinforced with a welded wire hoop, or 4,000 psi when reinforced with
welded wire fabric or fiber reinforcement The frame shall be anchored to the box by welding
headed studs 3 / by 3 inches long, as specified �n Section 9-06 15, to the frame The wire fabric
shall be attached to the studs and frame with standard tie practices The box shall contain ten
studs located near the centeriine of the frame and box wall The studs shall be placed one
anchor in each corner, one at the middle of each width and two equally spaced on each length
of the box
Materiafs for Type 1, 2, and 8 Concrete Junction Boxes shall conform to the followmg
Materials Requirement
Concrete Section 6-02
Remforcmg Steel Section 9-07
Fiber Reinforcing ASTM C 1116, Type III
Lid ASTM A 786 diamond plate steel
Slip Resistant Lid ASTM A 36 steel
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 78
Revlsed 8/27/13 �
'
�
�
�
r
�
�
'
�
�
�
�
�
�
�
�
'
��
Materials Requirement
Frame ASTM A 786 diamond plate steel orASTM
A36 steel
Slip Resistant Frame ASTM A 36 steel
Lid Support ASTM A 36, orASTM A1011 Grade SS
Handle & Handle support ASTM A 36 steel orASTM A1011 Grade
CS or SS
Anchors (studs) Section 9-06 15
ASTM F 593 or A 193, Type 304 or 316, or
Bolts, Studs, Nuts, Stainless Steel grade 302, 304, or 316
Washers steel in accordance with approved shop
drawm
Locking and Latching �n accordance with approved shop
Mechanism Hardware draw�ngs
and Bolts
9 2(1)B Heavy Duty Junctson Boxes
The section is revised to read
Heavy-Duty Junction Boxes shall be concrete and have a minimum vertical load rating of
46,000 pounds without permanent deformation and 60,000 pounds without fadure when tested
in accordance with Section 9-29 2(1)C
The Heavy-Duty Junction Box steel frame, lid support and lid shall be pamted with aoshop
applied, inorganic zinc primer in accordance with Section 6-07 3
Materiais for Type 4, 5, and 6 Concrete Junction Boxes shall conform to the following
Matenals Requ�rement
Concrete Section 6-02
Reinforcing Steei Section 9-07
ASTM A 786 diamond plate steel, rolled
from plate complying with ASTM A 572,
Lid grade 50 or ASTM A 588, and having a
min CVN toughness of 20 ft-Ib at 40
de rees F
Frame and stiffener ASTM A 572 grade 50 or ASTM A 588, both
plates with min CVN toughness of 20 ft-Ib at 40
de rees F
Handle ASTM A 36 steel or ASTM A 1011 Grade
CS or SS
Anchors (studs) Section 9-06 15
Bolts, Studs, Nuts, ASTM F 593 or A 193, Type 304 or 316, or
Washers Stainless steel grade 302, 304, or 316 in
accordance with a roved sho drawm
Hinges and Locking and � accordance with approved shop
Latching Mechanism drawmgs
Hardware and Bolts
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 79
t Revised 8/27N 3
�
�1
The lid stiffener plates shall bear on the frame, and be mdled so that there is full even contact,
around the perimeter, befinreen the bearmg seat and lid stiffener plates, after fabrication of the
frame and lid The bearmg seat and lid perimeter bar shall be free from burrs, dirt, and other
foreign debris that would prevent solid seatmg Bolts and nuts shalt be liberally coated with
anti-seize compound Bolts shall be mstalled snug tight The bearing seat and lid perimeter bar
shall be machined to allow a minimum of 75 percent of the bearmg areas to be seated with a
tolerance of 0 0 to 0 005 mches measured with a feeler gage The bearing area percentage
wili be measured for each side of the lid as it bears on the frame
9 2(1)C Testing Requirements
The first paragraph is revised to read
The Contractor shall provide for testing of �unction boxes, cable vaults and pull boxes
Junction boxes, cable vaults and pull boxes shall be tested by an independent materials
testing facility, and a test report issued documenting the results of the tests performed
The second paragraph is revised to read
For concrete �unction boxes, vaults and pull boxes, the independent testmg laboratory shall
meet the requirements of AASHTO R 18 for Qualified Tester and Verified Test Equipment The
test shall be conducted m the presence of a Professional Engineer, licensed under Title 18
RCW, State of Washington, in the branch of Civii or Structural, and each test sheet shall have
the Professional Engineer's origmal signature, date of signature, origmal seal, registration
number, and date of expiration One copy of the test report shali be furnished to the
Contracting Agency certifying that the box and cover meet or exceed the loadmg requirements
for a concrete �unction box, and shall mclude the following mformation
Product identificataon
2 Date of testmg
3 Description of testmg apparatus and procedure
4 All load deflection and fadure data
5
E^
�
Weight of box and cover tested
Upon completion of the required test(s) the box shall be loaded to failure
A brief descript�on of type and locat�on of fadure
The third paragraph is revised to read
For non-concrete �unction boxes the independent testing laboratory shall meet the
requirements of AASHTO R 18 for Qualified Tester and Verified Test Equipment The test shall
be conducted m the presence of a Professionai Engineer, licensed under Title 18 RCW, State
of Washington, m the branch of Civil or Structural, and each test sheet shall have the
Professional Engmeer's original signature, date of signature, origmal seal, registration number,
and date of expiration One copy of the test report shall be furnished to the Contractmg
Agency certifying that the box and cover meet or exceed the loading requirements for a non-
concrete �unction box, and shall include the following information
Product identification
2 Date of testing
�
�
�
r,
'
��
�
�
�
�
�
J
�
C�
�
C'
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 80
Revised 8/27/13 '
�
�
�
��
�
�
3 Descript�on of testing apparatus and procedure
4 All load deflection data
5 Weight of box and cover tested
The first paragraph following the titie "Testing for the Standard Duty Non-Concrete Junction
Boxes" is rev�sed to read
Non-concrete Junction Boxes shall be tested as defined in the ANSI/SCTE 77-2007 Tier 15
test method with test load mmimum of 22,500 ibs In addition, the Contractor shalt provide a
Manufacture Certificate of Compliance for each non-concrete �unction box instailed
9 2(2) Standard Duty and Heavy Cable Vaults and Pull Boxes
This section is revised to read
Standard Duty and Heavy-Duty Cable Vaults and Pull Boxes shall be constructed as a
� concrete box and as a concrete lid The lid for the Heavy-Duty and Standard Duty Cable
Vaults and Pull Boxes shall be mterchangeable and both shall fit the same box as shown in
the Standard Plans
�
�
r
�
�
The Contractor shall provide shop drawings for all components, mcludmg concrete box, Cast
lron Ring, Ductde Iron Lid, Steel Rings, and Lid In addit�on, the shop drawings shall show
placement of reinforcing steel, knock outs, and any other appurtenances The shop drawmg
shall be prepared by or under the direct supervision of a Professional Engineer, licensed under
Title 18 RCW, State of Washmgton, in the branch of Civil or Structural, and each sheet shall
carry the following
1
2
3
Professional Engineer's original signature, date of signature, original seal,
registrat�on number, and date of expiration
The �nitials and dates of all participating design professionals
Ctear notation of all revisions includmg rdentificat�on of who author�zed the revision,
who made the revision, and the date of the revision
� 4 Design calculations shail carry on the cover page, the Professional Engineer's
orig�nal signature, date of signature, ongmal seal, registration number, and date of
expiration
�
�
r
'
�
For each type of box or whenever there �s a change to the Cable Vault or Pull box design, a
proof test, as defined in this Specification, shall be perFormed and new shop drawings
submitted
9 Standard Duty Cable Vaults and Pull Boxes
This section is revised to read
Standard Duty Cable Vaults and Pull boxes shall be concrete and have a mmimum load ratmg
of 22,500 pounds and be tested in accordance with Section 9-29 2(1)C for concrete Standard
Duty Junction Boxes
� AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 81
Revised 8127/13
Concrete for standard duty cable vaults and pull boxes shall have a minimum compressive
strength of 4,000 psi The lid frame shall be anchored to the vault/box concrete lid by weiding
headed studs 3 / by 3 inches long, as spec�fied m Section 9-06 15, to the frame The w�re fabric
shall be attached to the studs and frame with standard tie practices The vault/box concrete lid
shall contam ten studs located near the centerline of the frame and wali Studs shall be placed
one anchor �n each corner, one at the middle of each width and two equaily spaced on each
length of the vault/box The steel frame, lid support, and lid shall be pamted with a black paint
contaming rust inhibiters or painted with a shop applied, inorgarnc zmc primer in accordance
with Section 6-07 3 or hot-dip galvanized in accordance with ASTM M 111
All Standard Duty Cable Vaults and Pull Boxes placed in sidewalks, walkways, and shared-
use paths shall have slip-resistant surfaces The steel frame, lid support, and lid for the
Standard Duty Cable Vaults and Pull Boxes shall be hot-dip galvarnzed
Materials for Standard Duty Cable Vaults and Pull Boxes shall conform to the following
Materials Requ�rements
Concrete Section 6-02
Remforcing Steel Section 9-07
Lid ASTM A 786 d�amond plate steel
Slip Resistant Lid ASTM A 36 Steel
Frame ASTM A 786 diamond plate steel or ASTM A 36
Slip Resistant Frame ASTM A 36 Steel
Lid Support ASTM A 36 Steel, or ASTM A 1011 Grade SS
Handle & Handle Support ASTM A 36 steel or ASTM A 1011 Grade CS or SS
Anchors (studs) Section 9-06 15
ASTM F593 orA 193, type 304 or 316, or Stainless
Bolts, Studs, Nuts, Washers steel grade 302, 304, 316 per approved shop
draw�n
Hinges and Locking
Mechanism Hardware and In accordance with approved shop drawings
Bolts
9 2(2)B Heavy Cable Vaults and Pull Boxes
This section is revised to read
Heavy-Duty Cable Vaults and Pull Boxes shall be constructed of concrete having a minimum
compressive strength of 4,000 psi, and have a mirnmum vertical load ratmg of 46,000 pounds
without permanent deformatron and 60,000 pounds withaut failure when tested in accordance
with Section 9-29 2(1)C for Heavy-Duty Junction Boxes
Materials for Heavy Duty Cable Vaults and Pull boxes shall conform to the following
Materials Requirements
Concrete Section 6-02
Reinforc�ng Stee{ Section 9-07
Cover Section 9-05 15(1)
Ring Section 9-05 15(1)
Anchors (studs) Section 9-06 15
i
�
�I
�
�
I�_1
E�
�
��
,
�
'
�
�
�
�
'
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 82 �
Revised 8/27/13
�
�
ASTM F 593 or A 193, Type 304 or 316, or
Bolts, Nuts, Washers Stamless steel grade 302, 304, 316 m
accordance with approved shop drawinq
9-29.6�2) Slip Base Hardware
� "AASHTO M 291" is revised to read "ASTM A 563", "AASHTO M 164" is revised to read "ASTM A
325", and "AASHTO M 293" is revised to read "ASTM F 436
�
�'
9-29 6(5) Foundation Hardware
"AASHTO M 291" is revised to read "ASTM A 563"
9 Luminaires
The th�rd paragraph is revised to read
� All lummaires shall be provided with markers for positive identification of light source type and
wattage in accordance with ANSI C136 15-2011 Legends shall be sealed with transparent film
resistant to dust, weather, and ultraviolet exposure
�
�
�
�
�
J
�I
�
LJ
r
�
�
9-29.10(2) Decorative Lurn�narses
The second sentence in the third paragraph is deleted
9 Traffic Signal Controiiers
This section and all sub-sections including title is revised to read
9-2913 Control Cabinet Assemblies �
Control cabinet assemblies shall include all necessary equipment and auxiiiary equipment for
controiling the operation of traffic signals, programmable message signs, diumination systems,
ramp meters, data stations, CCTV, and similar systems as required for the specific application
Traffic Signal Controller Cabmet Assembiies shall meet the requirements of the NEMA TS1
and TS2 specification or the California Department of Transportation "Transportation Electrical
Equipment Specifications" (TEES) dated March 12, 2009 as defined m this specification
9-2913(1) Env�ronmental, Performance, and Test Standards for Solid-State Traffic
Controller Assembi�es
The scope of this Specification includes the controiler of solid-state design installed m a
weatherproof controller cabinet The controller assembly includes the cabinet, controller
unit, load switches, signal conflict monitoring c�rcuitry, accessory logic circuitry, AC line
filters, vehicle detectors, coordination equipment and interFace, and preemption
equipment NEMA control assemblies shall meet or exceed current NEMA TS 1
Environmental Standards Normal operation will be required while the control assembly is
sub�ected to any combination of higF� and low environmental limits (such as low voltage at
high temperature with high repetit�on noise transients) All other control equipment shall
meet the environmental requirements of California Department of Transportation
"Transportation Electrical Equipment Specificat�ons" (TEES) dated March 12, 2009
The Contractor shall furnish to the Contracting Agency all guarantees and warranties
furnished as a normal trade practice for all control equipment provided
9-29 13(2) Manufacturing Quality
The fabricator of the Control, cabinet Assemblies shall perform quality control (QC)
inspections based on their QC program Their QC program shall be submitted and
approved by WSDOT at least annualiy The fabricator of the controller shall certify that the
� AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 83
Revised 8/27/13
controller meets all requirements of the Standard Specifications and Special Provisions
for the specific application
The QC program shall include, but not be limited to, the following
1
2
3
4
5
6
7
Quality Statement
individual responsible for quality (orgarnzational chart)
Fabrication procedures
Test procedures
Documented inspection reports
Documented test reports
Certification package
9-2913(2)A Tra�c Signal Controller Assembly Testing
Each tra�c signal controller assembly shall be tested as follows The supplier shall
1 Seven days prior to shipping, arrange appointment for controller cabmet
assembly, and testing at the WSDOT Materials Laboratory or the facil�ty
des�gnated in the Special Provisions
2 Assembly shall be defined as but not limited to tighternng all screws, nuts
and bolts, verifying that a{I wiring is ciear of movmg parts and properly
secured, mstalling all pluggables, connecting all cables, Venfy that all
Contract required documents are present, proper documentation is
provided, and all equipment required by the Contract is installed
3 The assembly shall be done at the des�gnated WSDOT facdity in the
presence of WSDOT personnel
4 The supplier shall demonstrate that all of the functions required by this
Spec�fication and the Contract Plans and Special Provisions perform as
intended Demonstration shall include but not be limited to energizmg the
cabinet and verifymg that all 8 phases, 4 pedestrian movements, 4 overlaps
(as required by the Contract Provisions) operate in accordance with Section
9-29 13 The supplier shall place the controller m minimum recall with
interval timing set at convenient value for testing purposes Upon a
satisfactory demonstration the controller assembly wdl then be accepted by
WSDOT for testing
5 If the assembly and acceptance for testing is not compiete within 5 workmg
days of defivery, the Pro�ect Engineer may authorize the return of the
assembly to the supplier, with collect freight charges to the supplier
6 The Contractor will be notified when the testing is complete, and where the
assembiy is to be picked-up for delivery to the proJect �
�
AMENDMEN7S TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 84 �
Revised 8/27/13
�
�
�
�
I�
�
�
�
�
�
�
,
�
�
�
�
�
�
7 The supplier has 5 working days to repair or replace any components that
fail during the testing process at no cost to the Contracting Agency A failure
shall be defined as a component that no longer functions as intended under
the conditions required or does not meet the requirements of the Contract
Specifications and is at the sole discretion of WSDOT
8 Any part or component of the controller assembly, includmg the cabinet that
is re�ected shall not be submitted for use by WSDOT or any City or County
in the State of Washington
9-2913(3) Traffic S�gnal Controller
The traffic signal controller shall conform to the Contract requirements and the applicabie
Specifications as listed below All solid-state electronic traffic-actuated controllers and
their supplemental devices shall employ digital timing methods
A NEMA control and all auxiliary equipment shall conform to current NEMA TS1 or
TS2 Specification Every pin of every connecting plug shall be utilized as
described within the NEMA requirement, except that those pins identified as
"spare" or °future" shall remain unused
B Type 170E controllers shall conform to the TEES The 170E controller shall be
provided with a program card, one blank ROM chip, and two 64K non-volatde
memory chips
C Type 170E/HC-11 controllers shall conform to the current Oregon Department of
Transportation Specification for model 170E/HC-11 controller The 170E
controller with the HC11 chip shall be compatible with the software specified in
the Contract The controller shall be provided with one ROM chip and one 64K
non-volatile memory chip
D Vacant
E Type 2070 controllers shall conform to the TEES The standard 2070 controller
sha{I consist of the following
2070 2070E 2070N1
2070-5 VME
ca e
2070-1 E CPU 2070-1 E CPU 2070-1 E CPU Card
Card Card
2070-3B Front 2070-36 2070-3B Front Panel
Panel Front Panel
2070-4 Power 2070-4 Power 2070-4 Power
Su I Su I Su I
2070-2A Field 2070-2A Field 2070-2B Fieid I/O
I/O UO
X X 2070-8 I nterface
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 85
� Revised 8/27N 3
9-29 13(4� TrafF�c-S�gnal Controller Software
All traffic signal controllers shall operate with software specified in the contract
Traffic-actuated controllers shall be electronic devices which, when connected to traffic
detectors or other means of actuation, or both, shall operate the electrical traffic signal
system at one or more intersections
If the complete traffic controller defined m the Special Provision requires NTCIP
compliance the following are the mirnmum requirements for NTCIP operation
Communicatoon
The traffic controller hardware and software shall communicate with the central computer
in a polled multi-drop operation In the polled multi-drop operation, several traffic
controliers shall share the same commurncation channel, with each controller assigned a
unique ID number Controiler ID numbers shall conform to the NTCIP requirements for
address numbers A traffic controller shall only reply to messages labeled with its ID In
polled multi-drop mode, traffic controllers never irntiate commurncation, but merely
transmit their responses to messages from the central computer
A laptop computer connected to the traffic controller's local communication port shall have
the same control and diagnostic capabilities as the central computer However, local
laptop control capabdity shall be limited to that traffic controller
NTCIP Requirements
The traffic controller software shall comply with the National Transportation
Commurncations for ITS Protocol (NTCIP) documents and all related errata sheets
published before July 1, 1999 and as referenced herein
The traffic controller software shall support the following standards
2
�
4
NTCIP 1101, S�mple Transportation Management Framework (STMF),
Conformance Level 1(Simple Nefinrork Management Protocol (SiVMP))
NTCIP 2001, Class B Profile All serial ports on the device shall support
communications according to these standards
NTCIP 2101, SP-PMPP/RS232 Point-to-Multi-Point Protocol (PMPP)
NTCIP 2201, NTCIP TP-Null Transport Profile Null �TP-NULL)
The traffic controller software shall implement all mandatory ob�ects of all mandatory
conformance groups as defined in NTCIP 1201, Global Ob�ect Defirnt�ons, and NTCIP
1202, Ob�ect De�nit►ons for Actuated Traffic S►gnal Controller Un�ts Software shall
implement the following conformance groups
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 86
Rewsed 8/27/13 �
,
�
�
�
�
�
�
LJ
��
L�
�
r
�
�
�1
�
�
�
�
NTCIP 1202, Ob�ect Definitions forASC
Conformance Grou Reference
Confi uration 1201 2 2
Time Mana ement
Time Base Event Schedule
Re ort 2 5
Phase 1202 2 2
Rin s 2 8
Detector 2 3
Urnt 2 4
Preem t 2 7
Time Base 2 6
Coordination 2 5
Channel 2 9
Overla s 2 10
The software shall implement the followmg optional ob�ects
Ob�ects required by these specifications shall support all values within its
standardized range The standardized range �s def�ned by a size, range, or
enumerated listing indicated in the ob�ect's SYNTAX field and/or through descriptive
text in the ob�ect's description field The following list indicates the modrfied ob�ect
requirements for these ob�ects
,
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Pa9e 87
� - Revised 8/27/13
Ob�ect Ob�ect Minimum
Name ID Re uirements
Unit unitAutoPedestrianClear All Values
urntControlStatus All Values
unitFlashStatus All Values
urntControl All Values
maxAlarmGrou s 1
S ecial Function maxS ecialFunct�onsOut uts 8
Coordination coordCorrectionMode Values 2 thru 4
coordMaximumMode Values 2 thru4
coordForceMode Values 2 and 3
maxPatterns 48
atternTableT e Either 2,3 or 4
maxS lits 16
s IitMode Values 2 thru 7
IocalFreeStatus Values 2 thru 11
Tirne Base maxTimebaseAscAction 48
Preem t maxPreem ts 4
reem tControl All Values
reem tState Values 2 thru 9
Overla s maxOverla s 4
overla T e Value 2 and 3
maxOverla statusGrou 1
Channels maxChannels 16
channelControlGrou Values 2 thru 4
channelFlash Value
0,2,4,6,8,10,12 and
14
channelDim Values 0 thru 15
maxChannelStatusGrou 2
TS 2 Port 1 maxPortAddresses 18
ort1Table Values 2 and 3
* values in excess of the minimum requirement are considered to meet the specificat�on
Documentation
Software shall be supplied with all documentation on a CD ASCII versions of the
follow�ng Management Information Base (MIB) files m Abstract Syntax Notation 1(ASN 1)
format shall be provided on CD-ROM
1 The official MIB Module referenced by the device functionality
2 A manufacturer-specific version of the officiai MIB Module with the non-
standardized range mdicated in the SYNTAX field The filename shail match the
official MIB Module, with the extension "spc"
3 A MIB Module of all manufacturer-specific ob�ects supported by the device with
accurate and meanmgful DESCRIPTION fields and the supported ranges
indicated in the SYNTAX field
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK
Revised 8/27/73
�
�
�
�
�
�
�
Page 88 � II
�l
9-29 13(5) Flashing Operations
� All traffic signals shall be equipped for flashing operation of signal displays Controllers
and cabinets shall be programmed for flashing red displays for all approaches Dunng
flashmg operation, all pedestrian circuits shail be de-energized
�
�
�
�
�
�9
��
�
��
�
�
�
�
u
�
�
Actuated tra�c signal control mechanisms shall be capable of entry mto flash operation
and return to stop-and -go operation as follows
Terminal Strip Input (Remote Flash) When called as a funct�on of a terminal strip
input, the controller shall provide both sequenced entry into flash and sequenced
return to normal operation consistent with the requirements of the latest edition
of the Manual on Uniform Traff�c Control Devices
2 Police Panel Switch When the flash-automatic switch located behind the police
panel door is turned to the flash position, the signals shall immediately revert to
flash, and, the controller shall have a stop t�me mput appiied When the switch is
placed on automatic, the controiler shall immediately time an 6 second all red
period then resume stop-and-go operations at the beginning of ma�or street
green
3 Controller Cabinet Switches When the flash-automatic switch located inside the
controller cabinet is piaced m the flash position, the s�gnals shall immediately
revert to flash, however, the controller shall not have a stop time input applied
When the flash-automatic switch is placed in the automatic position; the
controller shall immediately time a 6 second all red period, then resume stop-
and-go operation at the beginnmg of the ma�or green
4 Power Interruption On "NEMA" controllers any power interruption longer than
475 plus or minus 25 mdliseconds, signals shall re-energize consistent with No
2 above to ensure an 6-second flash period prior to the start of ma�or street
green A power mterruption of less than 475 plus or minus 25 milliseconds shall
not cause resequencmg of the controller and the signal displays shall re-
energize without change Type 170 controllers shail re-energize consistent with
No 2 above after a power interruption of 1 75 plus or minus 0 25 seconds The
6-second fiash period will not be required Any power mterruption to a 2070 type
controller shall result m a 6 second flash period once power is restored
5 Conflict Morntor Upon detecting a fault condition the conflict monitor shall
immediately cause the signal to revert to flash and the controller to stop time
After the conflict monitor has been reset, the controller shall immediately take
command of the signal displays at the beginning of ma�or street green
9-2913(6) Emergency Preempt�on
Immediately after a valid call has been received, the preemption equipment shall cause
the controller to termmate the appropriate phases as necessary with the requtred
clearance intervals and enter any programed subsequent preemption sequence
Preemption sequences shall be as noted �n the Contract
9-2913(7) Wiring Diagrams
Schematic winng diagrams of the controllers, cabinets and auxiliary equipment shall be
submitted when the assemblies are delivered The diagram shall show in detad all circuits
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 89
� Revised 8/27/13
and parts The parts shall be identified by name or number in a manner readily
mterpreted Two hard copies of the cabinet wirmg diagram and component wiring
diagrams shall be furnished wi#h each cabinet and a pdf file of the cabmet wiring and
component drawings The schematic drawing shall consist of a single sheet, detailmg ail
circuits and parts, not to exceed 52-mches by 72-inches The cabinet wiring diagram shall
indicate and identify all wire termmations, all plug connectors, and the locations of all
equipment in the cabinet Included m the diagram shail be an intersection sketch
identifymg all heads, detectors, and push buttons and a phase diagram
9-2913(8) Generator Transfer Switch
When specified in the contract, A generator transfer switch shall be included The
Generator Transfer Switch shail be capable of switching power from a utility power source
to an external generator power source
The Transfer Switch enclosure shall be of identical materials and dimensions and
mstallation methods as the Police Panel type enclosure specified in the first paragraph of
Special Provision 9-29 13(10)D except that the enclosure door shall include a spring
loaded construction core lock capable of accepting a Best 6-pin CX senes core The core
lock shall be mstalled with a green construction core Upon contract completion, two
master keys for the construction core shall be delivered to the Engineer
The enclosure shall inciude the following Transfer Switch equipment
One Nema L5-30P Flanged Inlet generator connector
2
3
One Utdity power indicator light
One generator indicator light
4 Two 30 amp, 120 volt, single pole, single phase, circuit breakers One circuit
breaker shall be labeled "Generator" and the other circuit breaker shall be
labeled "Utility" Both labels shall be engraved phenolic name plates
5 A mechanical lock out feature that prevents the Utility circuit breaker and the
Generator circuit breaker from being in the ON position at the same time The
circuit breakers shail be capable of being independently switched
�
�•.
7
The conductors from the Generator Transfer Switch enclosure to the cabinet
circuit breaker shall be enclosed m nylon mesh sleeve
The enclosure door shall be labeled with the letters "GTS"
9-2913(9) Vacant
9-29 13(10) NEMA, Type 170E, 2070 Controllers and Cabinets
9-29 13(10)A Aux�liary Equapment for NEMA Controllers
The following auxiliary equipment shall be furnished and installed in each cabinet for
NEMA traffic-actuated controllers
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 90 -
Revised 8l27i13 �
J
�
�
�
�
�
;�
�
�
�
II
u
�
li
u
�
�
�
�
�
2
3
A solid-state Type 3 NEMA flasher with flash-transfer relay which wdl cut in
the fiasher and isolate the controlier from light circuits See Sect�on 9-
29 13(5) for operational requirements
Modular solid state relay load switches of sufficient number to provide for
each vehicle phase (including future phases if shown m the plans), each
pedestrian phase and preemption sequence indicated in the Contract Type
P& R cabmets shall include a fully wired 16-position back panel Solid-state
load switches shail conform to NEMA standards except only optically
isolated load switches wdl be allowed Load switches shall include indicator
lights on the input and output circuits The controller cabinet shall have all
cabinet wirmg mstalled for eight vehicle phases, four pedestrian phases,
four emergency pre-empts, four overlaps (OLA, B, C, D)
A power panel with
a A control-d�splay breaker sized to provide 125 percent overload
protection for all control equipment and signal displays, 20 ampere
minimum
b A 15 ampere accessory breaker wired parallel to the control display
breaker The breaker will carry accessory loads, including vent fan,
cabinet light, plug receptacle, etc
c A busbar isolated from ground and unfused for the neutral side of
power supply
d A radio mterFerence suppresser instailed at the input power point
Interference suppressers shall be of a design which wdl mirnmize
mterference in both broadcast and aircraft frequencies, and shall
provide a minimum attenuation of 50 decibels over a frequency range
of 200 kdohertz to 75 megahertz when used in connection with normal
mstallations The mterference filters furnished shall be hermetically
sealed in a substantial case fiiled with a suitable insulating compound
Terminals shall be nickel plated, 10-24 brass studs of sufficient externai
length to provide space to connect two 8 AWG wires, and shall be so
mounted that they cannot be turned in the case
Ungrounded terminals shall be msulated from each other and shall
mamtain a surFace leakage distance of not less than '/Z-mch between
any exposed current conductor and any other metallic parts with an
insulation factor of 100-200 megohms dependent on external circuit
conditions
Suppressers shall be designed for operations on 50 amperes, 125
volts, 60 cycles, smgle wire circuits, and shall meet standards of the
Underwriters' Laboratories and the Radio Manufacturers Association
e A Surge Protection Device connected to the controller power circuit for
protection against voltage abnormalities of 1 cycle o� less duration The
Surge Protection Device shall be a solid state high energy circuit
contaming no spark gap, gas tube, or crow bar component The device
shall provide transient protection between neutral and ground, line and
ground, as well as line and neutral If the protection circwts fad, they
shall fail to an open circuit condition The mmimum interrupting capacity
shall be 10,000 Amps The Voltage Protection Ratmg shalf be 600 voits
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 91
� Revised 8/27/13
or less when sub�ected to an impulse of 6,000 volts, 3,000 amp source
impedance, 8 0/20 microsecond waveform as described in UL 1449 In
addition, the device shall dissipate a 13,000 Amp or greater repeated
single peak 8/20 m�crosecond current impulse, and withstand, without
fadure or permanent damage, one full cycle at 264 volts RMS The
device shall contain circwtry to prevent seif-mduced regenerative
ringing There shall be a fadure warnmg indictor which shall dluminate a
red light or extinguish a green light when the device has faded and is
no longer operable
Cabmet ground busbar independent (150K ohms mmimum) of neutral
4 A police panel located behmd the police panel door with a flash automatic
switch and a control-display power line on-off switch See Section 9-
29 13(5) for operational requirements
5 An auxdiary control panel located inside the controtler cabinet with a flash-
automatic switch and a controlter on-off switch See Section 9-29 13(5) for
operational requirements A three wire 15 ampere plug receptacle with
groundmg contact and 15 ampere ground fauit interrupter shall also be
provided on the panel
6 A conflict monitor conformmg to NEMA standards See Sect�on 9-29 13(5)
for operational requirements The urnt shall morntor conflicting signal
mdications at the field connection terminais The urnt shall be wired in a
manner such that the signal will revert to flash if the conflict morntor is
removed from service
Supplemental loads not to exceed 10 watts per morntored circuit or other
means, shall be provided to prevent conflict monitor actuation caused by
dimming or lamp burn-out Supplemental loads shall be installed on the
control side of the field terminals Confiict monitors shall mclude a minimum
of one mdicator light for each phase used The monitoring capacity of the
unit shall be compatible with the controller frame size Conflict monitors
shall mclude a program card
7 A"Detector Panel", as specified in Standard Spec��cat►on Section 9
29 13(10)B, shall be installed The panel shall be mounted on the mside of
the front cabinet door The detector panel shall be constructed as a single
unit Detector switches with separate operate, test, and off positions shafl be
provided for each field detector mput circuit A high intensity light emitting
diode (LED) shall be provided for each switch The lamp shall energize
upon vehicle, pedestrian or test switch actuation The test switch shall
provide a spring loaded momentary contact that wdl place a cail mto the
controller When in the OFF position, respective detector arcuits wdl be
disconnected In the operate position, each respective detector circuit shall
operate normally Switches shall be provided on the panel with labels and
funetions as follows
a
0
Display On — Detector mdicator lights shall operate consistent
with their respect�ve switches
Desplay Off— detector mdicator lights shall be de-energized
A means of disconnecting ail wiring entering the panel shall be provided �
The disconnect shall include a means to �umper detection calls when the
�
AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Page 92
Revised 8/27/13 �
�
�
�
�
�
�
�
r
�
�
�
CJ�
�
display panel is disconnected All switches on the panel shall be marked
with its associated Plan detector number All markers shall be permanent
8 Insulated terminal biocks of suff�cient number to provide a termmation for all
field wiring A mmimum of 12 spare terminals shall be provided Field wire
connection termmal blocks shall be 600 volt, heavy duty, barrier type,
except loop detector lead-ins, which may be 300 volt The 600 volt type
terminal strips shall be provided with a field-side and a control-side
connector separated by a marker strip The 300 volt type shall have a
marker strip, mstalled on the right side of vertical termmal strips or below
horizontal terminal strips The marker strip shall bear the c�rcuit number
indicated in the plans and shall be engraved Each connector shall be a
screw type with No 8 post capable of accepting no less than three 12 AWG
wires fitted with spade t�ps
9 A vent fan with ad�ustable thermostat The minimum CFM rating of the fan
shall exceed three times the cabinef volume
10 VACANT
11 All wiring withm the cabinet, exclusive of w�ring mstalled by the signai
controller manufacturer, shall have insulation conformmg to the
requirements of Section 9-29 3 Cabinet wiring shall be trimmed to eliminate
all slack and shafl be laced or bound together with nylon wraps or
equivalent All terminals, shail be numbered and permanently identified with
PVC or polyolefin wire marking s{eeve consistent with the cabinet wiring
diagram provided by the signal controller manufacturer and the Contract
The cabinet wdl be completefy wired so that the only requirement to make a
field location completely operational is to attach field power and ground
wiring Internal cabinet wirmg shall not utdize the fieid side connections of
the termmai strip intended for termination of field wires
12 Cabinet wiring diagram and component wiring diagrams meeting the
requ�rements of 9-29 13(7) shall be furnished with each cabmet Each
cabmet shall be equipped with a, shelf mounted roll out drawer mounted
directly below the controller to house one or more cabinet wirmg d�agrams
The cabinet wiring diagram shall indicate and identify all wire termmations,
all plug connectors, and the locations of all equipment in the cabinet
Included in the diagram shall be an intersection sketch identifying all heads,
detectors, and push buttons, and a phase diagram
13 Each vehicle detector amplifier, video detection
� call isolation urnt, phase selector, discrimmator,
identified with semi-permanent stick-on type label
shall be mcluded
�
a Vehicle Detector Ampl�fier Channel
Loop number
�
��
�
2 Assigned phase(s)
output channei pedestrian
and load switch shall be
The following information
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 93
� Rev�sed 8/27/13
b Ped Call Isolation Unit
Push button number
2 Assigned phase(s)
c Load Switches
Signal head number
2 Assigned phase(s)
d Phase Selectors
C�rcuit Letter
2 Phase(s) called
The labe{ shall be placed on the face of the unit it shall not block any switch, light, or
operational words on the urnt The lettering on this label shall be neat, legible, and
easily read from a d�stance of approximately 6-feet
9-2913(10)B Aux�liary Equipment for Type 170E, 2070 Assemblies
The following requirements apply to required aux�liary equipment furrnshed with Type
170E, 170E-HC-11 and 2070 controliers
A Flashers, flash transfer relays, conflict morntor, AC isolators, DC isolators,
discriminator modules, program modules, modem modules, breakers,
buses, police panel switches, receptacle requirement, vent fan and auxdiary
control panel switches shall conform to the requirements noted m the TEES
B Flashmg operation shall conform to Section 9-29 13(5), except the 6-second
flash period described in Item 2 of that section will not be required
Emergency preempt�on shall conform to Section 9-29 13(6)
C Input and output termmals shall be installed with a markmg strip with field
wire numbers noted m the Contract embossed on the str�p All cabmet and
field conductor shall have a PVC or polyolefin wire markmg sleeve installed,
matching the input and output terminals above Marking on sleeves shall be
embossed or type written
D The input panel terminal blocks TB 2 through TB 9 and associated cable to
the input fdes as described m the TEES shall be provided m all control
assemblies
E Supplemental {oad res�stor, not less than 2000 ohms and not greater than
5000 ohms not to exceed 1 Q watts per mon�tored circuit, shail be provided
to prevent conflict monitor actuation caused by d�mming or lamp burn-out
An individual supplemental load resistor shall be installed within the output
file, and shall be mstalled on each of the followmg terminal circuits
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 94
Rewsed 8l27/13 �
�
LJ
�
�
�
�
�
�
�
�
�
�
�
�
�
� �
�
F Load switches of suffic�ent quantity to fully populate the output files shall
conform to TEES and shall have indicator lights on mput and output circuits
G A detection panel, which shall be constructed as a single unit Detector
switches with separate operate, test, and off pos�tions shall be provided for
each field detector input circuit A high intensity light emittmg diode (LED)
shall be provided for each switch The lamp shall energize upon vehicle,
pedestrian or test switch actuation The test switch shail provide a spring
loaded momentary contact that wdl piace a call mto the controller When in
the OFF position, respective detector circuits will be disconnected In the
operate position, each respective detector circuit shali operate normally
Switches shall be provided on the panel with labels and functions as
foilows
a
0
Display On — Detector indicator lights shall operate consistent
with their respective switches
Display Off — detector indicator lights shall be de-energized
A means of disconnecting all wiring entering the panel shall be provided
The disconnect shall mclude a means to �umper detection calis when the
display panel is disconnected AI! switches on the panel shall be marked
with its associated Plan detector number All markers shall be permanent
H A"Detector Termination and Interface Panel" shall be provided When
viewing the cabinet from the back, the panel shall be located on the upper
left hand side of the cabinet The panel shall be electrically located between
the °detection Panel" and the C-1 connector The panel shall utilize
insulated terminal blocks and each connector shall be a screw type with
post
Each switchpack socket shall have pin 11 common to Nutral
J The AC input Sennce Panel Assembly (SPA), line voltage fiiter, transient
surge protection and all neutral bus bars and equipment ground bus bars
shall be on the right side of the cabinet, mounted no more that 18 inches
from the bottom of the cabinet when viewed from the rear, and meet the
requirements described in TEES
K The PED yeilow terminals on the CMU edge connector shall be extended
with a 2 foot wire, coiled, heat shrink tipped and labeled for the correct
corresponding terminal as CH-13Y/CMU-8, CH-14Y/CMU-11, CH-
15Y/CMU-K, CH-16Y/CMU-N
� L An "Absence Of Red Programming Assembly" shall be provided There shall
be provided on the back panel of the output file, 17 accessible �umper plug
attachment areas, made up of three male pms per position (one, for each
�
AMENDMENTS TO THE 2012 STANDARD SPEGIFICATIONS BOOK Page 85
� Revised 8/27/13
conflict monitor channel and one for red enable function) Each �umper piug
shall be a two position connector, It shall be possible, by inserting and
positiornng one of the 16 connectors on the right two pins on the monitor
board, to apply 120 VAC into a corresponding channel of the conflict
monitor red channels The connection between the red monitor board and
the conflict monitor shalf be accomplished via a 20 pin ribbon cable and the
mdustry standard P-20 connector that attaches on the front panel of the
monitor It shall be possible, by inserting and positioning one of the 16
�umper plugs on the two left pins on the monitor board, to enable the
corresponding channel to monitor for red fault by the conflict morntor There
shall be installed on the red monitor board a red fad monitor disable function
that controls the 120 VAC red enable signal into the conflict monitor During
stop-and —go operation, 120VAC is sent via pin #20 on the P20 connector to
enable red failure monitonng on the conflict monitor by having the connector
moved to the side labeled "Red Enable" If this is disengaged by moving
the connector to the side labeled "Red Relay", then 120VAC is removed
from pm #20, and the conflict monitor wdl no longer monitor for �ed fail
faults The red enable function will also be wired such that if the traffic
signal is in cabinet flash, then there wdl be no voltage on pm #20, and the
conflict monitor will not monitor for red fad faults
M Each cabinet shall be provided with at least 20 empty neutral connections
to accommodate field wirmg The neutral bus bars shall be of the style m
which a lug is not needed to be applied to the neutral field wire(s) All of the
neutral bars shall be secured in accordance with the TEES All neutral bars
shall be at the same electrical potential
N The main breaker on the SPA shall be provided with a cover to prevent
accidental trippmg The cover shall be removable and replaceabie without
the use of toois VACANT
O Equipment Branch Breaker —The duplex receptacle on the rear of either
PDA #2L or 3L shall be wired in parallel with the ground fault current
interrupt receptacle on the front of the power supply The ground fault
current interrupt receptacle being in the "Test" mode shail not remove power
to the rear receptacle
9-29 13(10)C NEMA Controller Cabinets
Each NEMA traffic controller shall be housed in a weatherproof cabmet conforming to
the following requirements
Construction shall be of 0 073-inch mirnmum thickness series 300 stamless
steel or 0 125 minimum thickness 5052 H32 ASTM B209 alloy aluminum
The stainless steel shall be annealed or one-quarter-hardness complying
with ASTM A666 stainless steel sheet Cabinets may be finished inside with
an approved firnsh coat of exterior white enamel If no other coating is
specified m the Contract Provisions the exter�or of all cabmets shall be bare
metal All controller cabinets shall be furnished with front and rear doors
2 The cabinet shall contam shelving, brackets, racks, etc , to support the
controller and auxdiary equipment All equipment shall set squarely on
shelves or be mounted in racks and shall be removable without turnmg,
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 96 �
Revised 8/27/13
�
�
�
�
�
�
�
��
�
�
�
�
�
�
�
�
L�
�
�
tiiting, or rotating or relocating one device to remove another A 24 slot rack
or racks shall be instalied The rack(s) shall be wired for 2 channel loop
detectors and as follows Slots 1& 2 phase 1 loop detectors Slots 3, 4, & 5
phase 2 loop detectors Slots 6& 7 phase 3 loop detectors Slots 8, 9, & 10
phase 4 loop detectors Slots 11 & 12 phase 5 loop detectors Slots 13, 14,
& 15 phase 6 loop detectors Slots 16 & 17 phase 7 loop detectors Slots
18, 19 & 20 phase 8 loop detectors Slot 21 upper phase 1 loop detector
Slot 21 lower phase 5 detector Slot 22 wired for a 2 channel discrimmator
channels A, C Slot 23 wired for a 2 channel discriminator, channels B, D
Slot 24 wired for a 4 channel discriminator, wired for channel A, B, C, and D
All loop detector slots shall be wired for presence/puise detection/extension
If an external power supply is required in order for the entire racks(s) to be
powered it shall be installed All rack(s) slots shall be labeled with engraved
identification strips
3 Additional detection utdizing the "D" connector shall be installed in
accordance with the Contract The cabinet shall be of adequate size to
properly house the controller and all required appurtenances and auxiliary
equipment in an upright position with a clearance of at least 3-inches from
the vent fan and filter to allow for proper air flow In no case shall more than
7Q percent of the cabinet volume be used There shall be at least a 2-inch
clearance between shelf mounted equipment and the cabinet wall or
equipment mounted on the cabinet wall
4 The cabinet shall have an air intake vent on the lower haif of the front door,
with a 12-mch by 16-inch by 1-mch removable throw away filter, secured in
place with a spring-loaded framework
5 The cabmet door(s) shall be provided with
a Cabinet doors shali each have a three pomt latch system Locks shall
be spnng loaded construction locks capable of accepting a Best 6 pin
core A 6 pin construction core of type (blue, green, or Red) specified in
the contract shall be installed in each core lock One core removal key
and two standard keys shall be included with each cabinet and
delivered to the Eng�neer
b A police panel assembly shall be installed in the front door and shall
have a stamless steel hinge pin and a police panel lock Two police
keys with shafts a minimum of 1 long shall be provided with
each cabinet
�
0
All doors and police panel door shall have one p�ece, closed cell,
neoprene gaskets
A two position doorstop assembly
6 Fluorescent fixtures or LED light stnps (only one type per cabmet) for
cabmet lighting Color temperature shall be 4100K (cool white) or higher
Fluorescent fixtures shali use 12 inch (nominal), 8W, type T5 shatterproof
tubular bulbs LED light strips shall be approximately 12 inches long, and
AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Page 97
� Rewsed 8/27/13
have a minimum output of 320 lumens Lightmg shall be ceiling mounted
and oriented parallel to the door face Lightmg shall not interfere with the
proper operation of any other ceding mounted equipment All lighting
fixtures shall energize whenever any door is opened Each door switch
shali be labeled "Light"
9-2913(10)D Cabinets for Type 170E and 2070 controllers
Type 170E and 2070 controllers shaii be housed �n a model 332L cabinet unless
specified otherwise in the contract Type 332L cabinets shall be constructed in
accordance with TEES with the following modifications
Each door shall be furnished with the equipment listed in Standard
Spec�ficat�ons 9-29 13(10)C item 5 above
�
�
�
�
�
2 The cabinet shall be furnished with auxdiary equipment described m
Standard Specification 9-29 13(10)B �
3 The cabinet shall be fabricated of stainless steel or sheet aluminum m
accordance with Section 9-29 13(10)C, Item 1 above Painted steel, painted
or anodized alum�num is not allowed
4 A disposable paper filter element with dimensions of 12" x 6" x 1" shall be
provided in lieu of a metai fiiter The fdter shall be secured in the filter
holder with a louvered aluminum cover The maximum depth of the cover
shail not be more than 0 5" inch to prov�de the filter to be fiush against the
door No mcoming air shail bypass the fdter element
IJ
�
�/
5 Field wire terminals shall be labeled in accordance with the Fieid Wiring �
Chart
6 Fluorescent fixtures or LED light strips (only one type per cabinet) for
cabinet lightmg Fluorescent fixtures shall use 12 inch (nominal), 8W, type
T5 tubular bulbs Tubular bulbs shall be contained within a shatterproof
lamp cover Led strips shall be approximately 12 inches long, and have a
mirnmum output of 320 lumens There shall be one fixture for each rack
within the cabmet Lighting shall be ceding mounted and onented
perpendicular to the door face Rack mounted lights are not allowed
Lighting shall be positioned such that the f�xture is centered between the
front and rear of the cabinet Lighting shall not interfere with the proper
operation of any other ceding mounted equipment Each lighting fixture
shall energize automaticaliy when either door to that respective rack is
opened Each door switch shall be labeled "Light"
7 One drawer shelf, as shown in the TEES
8 332D Controller Cabinet
a The 332D Controller cabmet shall have the appearance of two Type
332 controller cabinets �oined at opposing sides The outside
Dimensions of the cabinet shall be 67" High X 48 1/2" Wide X 30 1/4"
Deep
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 98 �
Revised 8/27/13
�J
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
c
d
e
b The right s�de of the cabinet, as viewed from the front, shall be
considered the Signai Control side The left side of the cabinet, when
viewed from the front, shall be considered the ITS/COMM side
One police access panel shall be mstalled on the right side of the
cabinet, as viewed from the front
Two cabinet lights shall be provided one on each side and as described
in section 9-29 13(10)D 6
Vacant
f The Traffic Signai Control side of the cabmet shall contam the Traffic
Signal Controller assembly and shall be furnished with equipment as
described in the contract specifications The Tra�c Signal Control side
of the cabmet shall also meet all the additional equipment requirements
of the Type 332 Signai Controller cabmet as indicated m the contract
specifications
g The ITS/COMM side of the cabinet shall contam ITS and
Communication equipment and shall be furnished with the following
1 One controller shelf unit, mounted 36 �nches from the bottom of the
cabinet open�ng to #he front of the cabinet and attaching to the
front rails of the EIA rack, shail be provided The shelf shall be
fabricated from aluminum and shall contain a rollout flip-top drawer
for storage of wiring diagrams and manuals
2 One alummum sheet metal panel, 1/8"x 15"x 54", shall be installed
to the rear of the cabinet on the right hand (when fac�ng the front)
side radmg
3 Additional ITS and Communicat�on equipment as described in the
Contract Pians and the ITS section of the Contract Special
Provisions
9-2913(11) Traffic Data Accumulator and Ramp Meters
All cabinets designated for use as a traffic data or ramp meter shall be Type 334L cabinets
furnished to meet the TEES with the modifications listed in Section 9-29 13(10)D and include
the following accessories
1
�
Each cabinet shall be equipped with a fully operable controller equipped as specified
in the Contract Provisions
Two input files, shall be provided
3 The PDA #3L shall contain three Model 200 Load Switches
A second transfer relay, Model 430, shall be mounted on the rear of the PDA #3L and
wired as shown m the Plans
� AMENDMBNTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 99
Revised 8/27H 3
4 Pol�ce Panet shall contain only one DPDT toggle switch The switch shall be labeled �
POLICE CONTROL, ON-OFF
'
�
,
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 100 �
Revised 8/27/73
�
�
C �
�
�
�
�
� 1
�
'
�
�
�
C
�
�
�
�
5 Display Panel
A General
Each cabinet shall be furnished with a display panel The panel shail be
mounted, showing and providing detection for mputs and specified controller
outputs, at the top of the front rack above the controller unit The display panel
shall be fabricated from brushed aluminum and constructed accordmg to the
detaii in the Plans
B Text
All text on the detector panel shall be biack in color and srik screened directly to
the panel except the Phenolic detector and cabmet nameplates
A nameplate for each loop shall be engraved with a'/-inch nominal text
according to the ITS Field W�rmg Charts The nameplates shall be permanently
a�xed to the detector panel
C LEDs
The LEDs for the display panel shall meet the following Specifications
Case size T 1 3 /
Viewing angle 50° mirnmum
Brightness 8 Milli candelas
LEDs with RED, YELLOW or GREEN as part of their labels shall be red, yellow
or green in color All other LEDs shall be red All LEDs shall have tinted diffused
lenses
D Detector panel Control Sw�tch
Each display panel shall be equipped with one detector dispiay control switch on
the panel with labels and functions as foilows
ON
Detector panel LEDs shall operate consistent with their separate switches
OFF
All detector mdicator LEDs shall be de-energized Detector calls shall
contmue to reach the controller
TEST
All detector indicator LEDs shall illuminate and no calis shall be placed to
the controller
E Advance Warning S�gn Control Sw�tch
Each display panel shall be equipped with one advance warrnng sign controi
switch on the panel with labels and functions as follows
AUTOMATIC
Sign Relay shall energize upon ground true call from controller
SIGN OFF
Sign Relay shail de-energize
SIGN ON
Sign Relay shall energize
� AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 101
Revised 8/27/13
�
F S�gn Relay
The sign relay shali be plugged into a socket installed on the rear of the display
panel The relay shall be wired as shown m the Plans The relay coil shall draw
{or sink) 50 milliamperes t 10% from the 170E/HC11 controller and have a
DPDT contact rating not less than 10 amperes A 1 N4004 diode shall be placed
across the relay cod to suppress voltage spikes The anode termmal shall be
connected to terminai #7 of the relay as labeled in the Plans The relay shall
energize when the METERING indicator LED is lit
G Detector Input Indicators
One LED and one spring-loaded two-position SPST toggie switch shall be
provided for each of the 40 detection inputs These LEDs and switches shall
function as follows
TEST
When the switch is m the test position, a call shall be placed to the controller
and energize the associated LED The switch shall automatically return to
the run position when it is released
�
�
�
�
�
�
RUN
In the run position the LEDs shail dluminate for the durat�on of each call to �
the controller
H Controller Output Ind�cators
The d�splay panel shall contain a series of output indicator LEDs mounted below
the detection mdicators The layout shall be according to the detail in the Plans
These LEDs shafl dlummate upon a ground true output from the controller via the
C5 connector
The output indicator LEDs shall have resistors in senes to drop the voltage from
24 volts DC to their rated voltage and limit cuRent below their rated current The
anode connection of each LED to +24 VDC shall be wired through the resistor
Connectors
Connection to the display panel shall be made by three connectors, one pin
(labeled P2) and one socket (labeled P1) and one labeled C5 The P1 and P2
connectors shall be 50-pin cannon D series, or equivalent 50 pin connectors and
shall be compatible such that the two connectors can be connected directly to
one another to bypass the input detection Wirmg for the P1, P2 and C5
connectors shall be as shown in the Plans
The Contractor shall install wire connectors P1, P2, C1P, C2, C4, C5 and C6
accordmg to the pin assignments shown in the Plans
6 Model 204 Flasher Unit
Each Model 334 ramp meter cabinet shall be supplied with one Model 204 sign
flasher urnt mounted on the right rear side panel The flasher shall be powered from
T1-2 The outputs from the flasher shall be wired to T1-5 and T1-6
7 F�ber Opt�c Patch Panei
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 102 �
Rewsed 8/27/13
�
�
The Contractor shail provide and install a rack-mounted fiber optic patch panei as
identified in the Plans
Cabinet Wiring
� Terminal blocks TB1 through T69 shall be installed on the Input Panel Layout and
position assignment of the terminal blocks shall be as noted in the Plans
1 Termmais for field wiring in traffic data and/or ramp metermg controller cabinet shall be
labeled, numbered and connected m accordance with the following
�
�
�
�
�
�
��
�
II
�
�
�
�
�
�
Termonal Block Pos Terminal and W�re Numbers Connection Identif�cation
TBS 501-502 AC Power, Neutral
T1-2 641 Sign on
T1-4 643 Sign off
T1-5 644 Flasher Output NC
T1-6 645 Fiasher Output NO
T4-1 631 Lane 3- Red
T4-2 632 Lane 3— Yellow
T4-3 633 Lane 3— Green
T4-4 621 Lane 2- Red
T4-5 622 Lane 2- Yellow
T4-6 623 Lane 2— Green
T4-7 611 Lane 1— Red
T4-8 612 Lane 1— Yellow
T4-9 613 Lane 1— Green
Loop lead-in cables shall be labeled and connected to cabmet termmals according to the
ITS Field Wirmg Chart This chart will be provided by the Eng�neer within 20 days of the
Contractor's request
9-29 13(12) ITS cab�net
Bas�c ITS cabmets shall be Model 334L Cab�nets, unless otherwise specified in the Contract
Type 334L Cabinets shail be constructed in accordance with the TEES, with the following
mod�fications
1 The basic cabmet shall be furrnshed with only Housmg 1 B, Mount�ng Cage 1,
Service Panel #1, a Drawer Shelf, and Controller Unit Supports Additional
equipment may be specified as part of the cabinet function-specific standards
2 Housing aluminum shall be 5052 alloy with mill fmish Painted or anodized aluminum
is not allowed
� AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 103
Rewsed 8/27/13
3 The door air filter shall be a disposable paper filter element of at least 180 square �
mches
4 Locks shall be spring loaded construction core locks capable of acceptmg a Best 6-
pin core A 6-pin construction core of the type (Blue, Green, or Red) speci�ed in the
Contract shali be installed m each core lock One core removal key and finro
standard keys (properly marked) shall be mcluded with each cab�net and delivered to
the Engineer upon Contract completion
5 Each cabinet shall include a 120VAC electric strip heater with a rating of 100 watts,
which shall be thermostat controiled The heater strip shall be fed by wire with a
temperature ratmg of 400°F or higher, and shall be shielded to prevent contact with
wiring, equipment, or personnel If the heater thermostat is separate from the fan
thermostat, the heater thermostat must meet the same requirements a++++s the fan
thermostat as defined in TEES
6 Fluorescent fixtures or LED light strips (only one type per cabinet) for cabinet lightmg
Color temperature shall be 4100K (cool white) or higher Fluorescent fixtures shall
use 12 inch (nominal), 8W, type T5 tubular bulbs contained within a shatterproof
lamp cover LED light strips shall be approximately 12 inches long, and have a
minimum output of 320 lumens There shall be two fixtures for each rack within the
cabinet Lighting shall be ceding mounted and oriented parallel to the door face — rack
mounted lighting is not permitted Lightmg shall not mterfere with the proper
operation of any other cedmg mounted equipment All lighting fixtures above a rack
shall energize whenever either door to that respective rack is opened Each door
switch shall be labeled "Light"
7 Each cabmet shall be equipped with a power distribution assembly (PDA) mounted in
a standard EIA 19-inch (ANSI/EIA RS-310-C) rack utdizing no more than five Rack
Mounting Units (RMU) (8 75 inches) The PDA shall include the following equipment
a
L7
c
�
One duplex NEMA 5-15R GFCI receptacle on the front of the PDA
Four duplex NEMA 5-15R receptacles on the rear of the PDA These
receptacles shall remain energized on a trip or failure of the GFCI
receptacle
Four 1 P-15A, 120VAC Equipment/Field Circuit Breakers
Line filter meeting the requirements of 9-29 13(10)A d
PDA components shall be mounted in or on the PDA such that they are readily
accessible, provide dead front safety, and all hazardous voltage pomts are
protected to prevent inadvertent contact
8 Service Panel #1 shall include a service termmal block labeled "TBS", a Tesco TES-
10B or equivalent surge suppressor connected to provide power in Ime surge
suppression, and a 1 P-30A Main Breaker The Service Panel Assembly (SPA)
shown in the TEES shall not be included
�
�
�
�
�
�
�
L�
�
�
�
�
�
�
�
9 Each cabinet shall include a rack mounted fiber optic patch panel of the type �
specified in the Contract
�
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 104 �
Revised 8/27/73
�
�
�
�
�
�
'
Cabinet drawings and wiring diagrams shall be provided in the drawer shelf Additionally, an
electrornc (PDF format) copy of all drawings and wiring diagrams shall be provided
9 Conventional Optical System
Th�s section's title is revised to read
9-29 16(1)A1 Non-LED Opt�cai System
9 16(1)D1 Electrical - Convent�onal
This section's title is revised to read
9-29 16(1)D1 Electrical — Non-LED
9 20 Pedestr�an S�gnals
This section is revised to read
Pedestrian signals shall be Light Emitting Diods (LED) type
The LED pedestrian signal module shall be operationally compatible with controliers and
� conflict monitors The LED lamp unit shall contain a disconnect that wdl show an open switch
to the conflict monitor when less than 60 percent of the LEDs in the unit are operational
�
�
�
�
�
�J
�
The Pedestrian signal heads shall be on the QPL or the Contractor shall submit a
Manufacturer's Certificate of Compliance, m accordance with Standard Specification 1-06 3,
with each type of signal head The certificate shall state that the lot of pedestrian signal heads
meet the following requirements
1 All pedestrian signal heads shall be a Walk/Don't Waik module with a countdown
display
2 All pedestrian displays shall comply with the MUTCD and ITE publication ST 011 B,
VTCSH2 or current ITE Specificat�on and shall have an mcandescent appearance
The Contractor shall provide test results from a Nationally Recogrnzed Testing
Laboratory documenting that the LED dispiay conforms to the current ITE and the
following requirements
a All pedestrian signals supplied to any one pro�ect shall be from the same
manufactu�er and type but need not be from the same manufacturer as the
veh�cie heads
b Each pedestrian signal face shall be a smgle unit housing with the signal
indication size, a nominal 16 mch x 18 inch with side by side symbol messages
with countdown display
c Housings shail be green polycarbonate or die-cast aluminum and the aluminum
� housmgs shall be painted with two coats of factory applied traffic signai green
enamei (Federal Standard 595-14056) All hinges and latches and mter�or
hardware shall be stainless steel
�
�
3 Optical units for traffic signal dispiays shail conform to the following
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 105
� Rewsed 8/27/13
a Pedestrian "RAISED HAND° and "WALKING PERSON" modules shall be the
countdown display type showing the time remaining in the pedestrian change
mtervai When the pedestrian change mterval is reduced due to a programming
change, the display may continue to show the previous pedestrian change
interval for one signal cycle During the following pedestrian change interval the
countdown shall show the revised time, or shall be blank In the event of an
emergency vehicie preemption, during the following two cycies, the display shall
show the programmed pedestrian change interval or be blank In the event the
controlier is put in stop time durmg the pedestrian change interval, during the
followmg two cycles the display shall show the programmed clearance or be
blank In the event there is radroad preempt during the pedestrian change
interval, during the following two cycles the display shall show the programmed
clearance or be blank Light emittmg diode (LED) light sources havmg the
incandescent appearance are required for Portland Orange Raised Hand and
the Lunar White Walking Person
4
LED displays shall conform to the following
a
b
c
d
Wattage (Maximum) Portland Orange Raised Hand, 15 watts Lunar White
Walkmg Person, 15 watts
Voltage The operatmg voltages shall be between 85 VAC and 135 VAC
Temperature Temperature range shall be -35° F to +165° F
LED pedestrian heads shall be supplied with Z crate visors Z crate visors shall
have 21 members at 45 degrees and 20 horizontal members
9 20(1) LED Pedestrian Displays
This sect�on is deleted
9 20(2) Neon Grid Type
This section is deleted
9 24 Service Cabenets
In the first paragraph, the lettered items A-J are re-lettered to read B-K respect#ully
The first paragraph is supplemented with the following new lettered item
A Display an arc flash warning labei that meets the requirements of ANSI Z535
9 25 Amplifier, Transformer, and Terminal Cabonets
In item No 2 C,"Transformer 23 1 to 12 5 KVA" is revised to read "Transformer 3 1 to 12 5 KVA"
and the height column value of 40" is revised to read "48"
The first and second sentences in the first paragraph are revised to read
Amplifier and terminal and transformer cabinets shali be NEMA 3R and the follow�ng
Item number 5 is revised to read
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 106 �
Rev�sed 8/27i13
�
C
'
�
�
�
�
�
�
�
5 All cabinets shall provide a gasketed door flange
Item number 7 is revised to read
7 Insulated terminal blocks shall be 600 vott, heavy-duty, barrier type The terminal blocks
shall be provided with a field-side and a controi-side connector separated by a marker
strip One spare 12-position insulated terminal block shall be mstalled in each terminal
cabinet and amplifier cabmet
Item nurnber 8 is rewsed to read
8 Each non-pad mounted Terminai, Amplifier and Transformer cabinet shall have 1/4 inch
drain holes in back corners Each pad mounted Termmal, Ampiifier and Transformer
cab�net shall dram to a sump and through a 3!8 inch diameter dram pipe to grade as
detaded in the Standard Plans
Item number 10 is revised to read
10 Transformer cabinets shall have two separate compartments, one for the transformer and
one for the power distribution circuit breakers Each compartment shall be enclosed with a
dead front Each breaker shall be labeled with the device name by means of a screwed or
riveted engraved name plate
Section 9-34, Pavement Mark�ng Material
August 5, 2013
9-34 2 Paint
The second paragraph is revised to read
Blue and black paint shall comply with the requirements for yellow paint m Section 9-34 2(4)
� and Section 9-34 2(5), with the exception that blue and black paints do not need to meet the
requ�rements for titanium dioxide, directional reflectance, and contrast ration
� 9 3(4) Type D Liquid Cold Applied Methyl Metharcrylate
The column headings in the table titled "98 2 Formulations Type D— Liquid Cold Applied Methyl
Methacrylate" are revised to read
u
�
L I
�
�
�
�
98 2 Formulat�ons Type D— L�quid Cold Appl�ed Methyl Methacrylate
Property D-1 D- 2 1 l� D-4 � D-5 D-6
Test Method Min Ma�c Mtn Max j Mm Max Min Max Mm Max Mtn Max
Section 9-36, Shaft-ReFated Mater�als
August 5, 2013
9-36 1(1) Permanent Casing
This section is revised to read
Permanent cas�ng shall be of steel base metal conforming to ASTM A 36, ASTM A 252 Grades
2 or 3, ASTM A 572, or ASTM A 588
� AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 107
Rev�sed 8/27H 3
C�
1
1
,,
��
1
�
1
�
1
�
��
�
�
1
1
1
1
1
1
AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Page 108 �
Revised 8/27/13
�
,
'
�
�
�
�
�
,
�
�
'
�
,
�
�
�
'
i
�
�
PART I11
SPECIAL PROVISIONS
�
,
�
�
�
�
�
�
�
'
�
�
�
,
�
'
'
�
�
TABLE OF CONTENTS
INTRODUCTION TO THE SPECIAL PROVISIONS
DIVISION 1 GENERAL REQUIREMENTS
DIVISION 5- SURFACE TREATMENTS AND PAVEMENTS
STANDARD PLANS
C�ty of Bremerton
BVR and LFR Preservat�on Pro�ect
Contract Documents
�
III-1
III-3
III-45
III-53
Bremerton Pro�ect No 6187
September 2013
Table of Contents
,
�
�
'
�
INTRODUCTION TO THE SPECIAL PROVISIONS
(August 94, 2013 APWA GSP)
The work on this pro�ect shall be accomplished in accordance with the Standard Specificat�ons
for Road, Br►dge and Murncipal Constructron, 20***12"** ed�tion, as issued by the Washington
State Department of Transportation (WSDOT) and the American Public Works Association
(APWA), Washington State Chapter (hereafter "Standard Specifications") The Standard
Specifications, as modified or supplemented by the Amendments to the Standard Specifications
and these Special Provisions, all of which are made a part of the Contract Documents, shall
govern all of the Work
, These Special Provisions are made up of both General Special Provisions (GSPs) from various
sources, which may have proJect-specific fill-ms, and pro�ect-specific Special Provisions Each
Provision either supplements, modifies, or replaces the comparabie Standard Specification, or is
� a new Provision The deletion, amendment, alteration, or addition to any subsect�on or portion
of the Standard Specifications is meant to pertain oniy to that particular portion of the section,
and in no way should it be interpreted that the balance of the section does not appiy
� The pro�ect-specific Special Provisions are not labeled as such The GSPs are labeled under
the headers of each GSP, with the effective date of the GSP and its source For example
/ (March 8, 2013 APWA GSP)
(Aprii 1, 2013 WSDOT GSP)
(May 1, 2013 $$2$$ GSP)
�
�
�
'
�
C J
[�
�
�
�
Also incorporated into the Contract Documents by reference are
Manua! on Urnform Traffic Control Devices for Streets and H�ghways, currently adopted
edition, with Washtington State modificat�ons, if any
Standard Plans for Road, Bridge and Mun�c�pal Construct�on, WSDOT/APWA, current
edition
*** Standard Spec�ficat►ons for Road, Bridge, and Mun�c�pa! Construct�on, WSDOTlAPWA,
2012 Edition, M 41-10''**
Contractor shall obtain cop�es of these pubi�cat�ons, at Contractor's own expense
' C�ty of Bremerton
BVR and LFR Preservat�on Pro/ect
Contract Documents
lll-1
Bremerton Pro/ect No 6187
September 2013
Introductton to the Special Prowsrons
'
�
'
L�
�
�
DESCRIPTION OF WORK
DIVISION 1
GENERAL REQUIREMENTS
(March 93, 1995, WSDOT GSP)
This Contract prov�des for the improvement of **�` Belfair Valley and Lake Flora Roads and
includes but is not lim�ted to, pavement repairs, overlay, and traffic control *** all in accordance
with the Contract Plans, these Contract Provisions, and the Standard Specificat�ons
� 1-01
1-01 3
�
�
�
DEFINITIONS AND TERMS
Defenitions
(March 8, 2013 APWA GSP)
Delete the headmg Completion Dates and the three paragraphs that follow it, and replace them
with the following
Dates
B�d Open�ng Date
The date on which the Contractmg Agency publicly opens and reads the Bids
� Award Date
The date of the formal decision of the Contracting Agency to accept the lowest
responsible and responsive Bidder for the Work
I�
'
Contract Execut�on Date
The date the Contracting Agency officially binds the Agency to the Contract
Not�ce to Proceed Date
The date stated m the Notice to Proceed on which the Contract time begms
� Substant�a/ Comp/etion Date
The day the Engineer determines the Contracting Agency has full and unrestricted use
and benefit of the facilities, both from the operational and safety standpoint, any
, remaining traffic disruptions wdl be rare and brief, and only minor incidental work,
replacement of temporary substitute facdities, plant establishment periods, or correction
or repair remains for the Physical Completion of the total Contract
�
�
,
Physica/ Comp/et�on Date
The day all of the Work is physically completed on the pro�ect All documentation
required by the Contract and required by law does not necessarily need to be furnished
by the Contractor by this date
' C�ry of Bremerton
8VR and LFR Prese�vat�on Pro�ect
Contract Documents
lll-3
Bremerton Pro/ect No 6987
September 2013
Dtws�on 1
'
�
Comp/ef�on Date
The day all the Work specified in the Contract is completed and afl the obligations of the
Contractor under the contract are fulfilled by the Contractor Ali documentation required
by the Contract and required by law must be furnished by the Contractor before
establishment of this date
F�na/ Acceptance Date
The date on which the Contracting Agency accepts the Work as complete
Supplement this Section with the following
All references in the Standard Specifications, Amendments, or WSDOT General Special
Provisions, to the terms °State", "Department of Transportation", "Washington State
Transportation Commission", "Commission", "Secretary of Transportation", "Secretary",
"Headquarters", and "State Treasurer" shall be revised to read "Contract�ng Agency"
All references to "State Materials Laboratory" shall be revised to read "Contracting Agency
designated location"
All references to "final contract voucher certification" sha11 be �nterpreted to mean the final
payment form established by the Contracting Agency
,
�
�
�_J
�
,
LJ
The venue of all causes of action arising from the advertisement, award, execution, and �
performance of the contraCt shall be m the Superior Court of the County where the
Contractmg Agency's headquarters are located _
Addetive
A supplemental urnt of work or group of bid items, identified separately in the Bid Proposal,
which may, at the discretion of the Contracting Agency, be awarded in addition to the base
bid
Alternate
One of two or more units of work or groups of bid items, identified separately in the Bid
Proposal, from which the Contracting Agency may make a choice between different
methods or material of construct�on for performing the same work
Business Day
A business day is any day from Monday through Friday except holidays as listed in Section
1-08 5
Contract Bond
The defin�tion in the Standard Specifications for "Contract Bond" applies to whatever bond
form(s) are reqwred by the Contract Documents, which may be a combination of a Payment
Bond and a Performance Bond
Contract Documents
See de�rntion for "Contract"
Contract Time
The period of time established by the terms and conditions of the Cantract within wh�ch the
Work must be physically completed
City of Bremerton Bremerton Pro/ect No 6187
SVR and LFR Preservation Pro�ect ll!-4 September 2013
Contract Documents D�vis�on 1
�
'
'
�
'
Notice of Award
The wntten notice from the Contracting Agency to the successful Bidder sigrnfying the
Contracting Agency's acceptance of the Bid Proposal
Notice to Proceed
The written notice from the Contracting Agency or Engineer to the Contractor authorizing
and directing the Contractor to proceed �nnth the Work and establishing the date on which
the Contract time begins
Traffic
Both vehicular and non-vehicular traffic, such as pedestnans, bicyclists, wheelchairs, and
equestrian traffic
� 1-02
1-02 1
'
,
�
�
�
'
�
�
BID PROCEDURES AND CONDITIONS
Prequalif�cation of Bidders
Delete Section 1-02 1 and replace it with the following
1-021 Qualificatoons of B�dder
(January 24, 2019 APWA GSP)
Before award of a public works contract, a bidder must meet at least the minimum
qualifications of RCW 39 04 350(1) to be considered a responsible bidder and qualified to
be awarded a public works pro�ect
1-02 2 Plans and Spec�f�cat�ons
(June 27, 2011 APWA GSP)
Delete this section and replace it with the following
Information as to where Bid Documents can be obtained or reviewed will be found m the
Call for Bids (Advertisement for Bids) for the work
After award of the contract, plans and specifications wdl be issued to the Contractor at no
cost as detailed below
To Pr�me Contractor No of Sets Bas�s of Distrebution
Reduced lans 11" x 17" *** 2**" Furrnshed automatically upon award
Contract Provisions *** 2*** Furrnshed automaticall u on award
Large plans (e g, 22" x 34") and
Contract Provisions '��`* 0�`*" Furn�shed onl u on re uest
' Additional plans and Contract Provisions may be obtamed by the Contractor from the source
stated m the Call for Bids, at the Contractor's own expense
L J
!J
� C►ty of Bremerton
BVR and LFR Preservahon Pro�ect
Contract Documents
IU-5
Bremerton Pro�ect No 6187
September 2013
Diws►on 1
�_J
'
1-02 5 Proposal Forms
(June 27, 20� 9 APWA GSP)
Delete this section and replace it with the following
The Proposal Form will identify the pro�ect and its location and describe the work It will also
list estimated quantities, units of ineasurement, the items of work, and the materrals to be
furnished at the urnt bid prices The bidder shall complete spaces on the proposal form that
call for, but are not limited to, urnt prices, extensions, summatians, the total bid amount,
signatures, date, and, where applicable, retail sales taxes and acknowledgment of addenda,
the bidder's name, address, telephone number, and signature, the bidder's D/M/WBE
commitment, if applicable, a State of Washmgton Contractor's Registration Number, and a
Business License Number, if applicabie B�ds shail be completed by typmg or sha!! be
printed m ink by hand, preferably in black ink The required certi�cations are included as part
of the Proposal Form
The Contracting Agency reserves the right to arrange the proposal forms with alternates and
additives, if such be to the advantage of the Contracting Agency The bidder shall bid on all
alternates and additives set forth m the Proposal Form unless otherwise specified
1-02 6 Preparation of Proposal
(June 27, 2019 APWA GSP)
Supplement the second paragraph with the following
4 If a minimum bid amount has been established for any item, the unit or lump sum price
must equal or exceed the mmimum amount stated
5 Any correction to a bid made by interlineation, afteration, or erasure, shall be initiaied by
the s�gner of the bid
Delete the last paragraph, and replace it with the foilowing
The Bidder shall make no stipulation on the Bid Form, nor qualify the bid m any manner
A bid by a corporation shall be executed m the corporate name, by the president or a vice
president (or other corporate officer accomparned by ev�dence of authority to sign)
A bid by a partnership shall be executed in the partnership name, and signed by a partner A
copy of the partnership agreement shall be submitted with the Bid Form if any D/M/WBE
requirements are to be sat�sfied through such an agreement
A bid by a �oint venture shall be executed in the �oint venture name and signed by a member
of the �omt venture A copy of the �oint venture agreement shall be submitted with the Bid
Form if any D/W/MBE requirements are to be satisfied through such an agreerr�ent
�
,
�
C �
'
�
�
�
�
�
,
�
'
L�
'
�
Gty of Bremerton
BVR and LFR Preservahon Pro�ect
Contract Documents
111-6
Briemerton Pro�ect No 6187 ,
September 2013
Dtvrston 9
u
'
'
�
�
�
'
�J
�
�
�
'
'
�
'
�
'
�
1-02 7 Bid Deposit
(March 8, 2013 APWA GSP)
Supplement this section with the following
Bid bonds shall contam the following
1 Contracting Agency-assigned number for the pro�ect,
2 Name of the pro�ect,
3 The Contractmg Agency named as obligee,
4 The amount of the b�d bond stated either as a dollar figure or as a percentage which
represents five percent of the maximum bid amount that could be awarded,
5 Signature of the bidder's officer empowered to sign official statements The signature of
the person authorized to submit the bid should agree with the signature on the bond, and
the title of the person must accompany the said signature,
6 The signature of the surety's officer empowered to sign the bond and the power of
attorney
If so stated in the Contract Provisions, bidder must use the bond form included in the
Contract Provis�ons
If so stated in the Contract Provisions, cash wdl not be accepted for a bid deposit
1-02 9 Delivery of Proposal
(August 15, 2012 APWA GSP, Opt�on A)
Delete this section and replace it with the following
Each proposal shall be submitted m a sealed envelope, with the Pro�ect Name and Pro�ect
Number as stated in the Cafl for Bids clearly marked on the outside of the envelope, or as
otherwise required in the Bid Documents, to ensure proper handling and delivery
If the proJect has FHWA funding and requires DBE Written Confirmation Documents or
Good Faith Effort Documentation, then to be considered responsive, the Bidder shall submit
with their Bid Proposal, written Confirmation Documentation from each DBE firm listed on
the Bidder's completed DBE Utilization Certification, form 272-056A EF, as required by
Section 1-02 6
The Contracting Agency wdl not open or consider any Bid Proposal that is received after the
time specified in the Call for Bids for receipt of Bid Proposals, or received in a location other
than that specified in the Call for Bids
' C►ty of Breme�fon
BVR and LFR Preservahon Pro�ect
Contract Documents
lll-7
Bremerton Pro�ect No 6187
September 2013
D�ws►on 1
L_J
1-02 13 Irregular Proposais
(March 13, 2012 APWA GSP)
Revise item 1 to read
A proposal wdl be considered irregular and will be re�ected if
a The Bidder is not prequalified when so reauired,
b The author�zed proposal form furnished by the Contracting Agency is not used or is
altered,
c The completed proposal form contains any unauthorized additions, deletions,
alternate Bids, or conditions,
d The Bidder adds provisions reserving the right to reJect or accept the award, or enter
into the Contract,
e A price per urnt cannot be determmed from the Bid Proposal,
f The Proposal form �s not properly executed,
g The Bidder fads to submit or properly complete a Subcontractor list, if applicable, as
required m Section 1-02 6,
h The Bidder fails to submit or properly complete a Disadvantaged Business Enterprise
Certification, if applicable, as required in Section 1-02 6,
i The Bidder fails to submit written confirmation from each DBE firm listed on the
Bidder's completed DBE Utilization Certificat�on that they are in agreement with the
bidders DBE participation commitment, if applicable, as required m Section 1-02 6, or
if the written confirmation that is submitted fails to meet the requirements of the
Special Provisions,
J The Bidder fads to submit DBE Good Faith Effort documentation, if applicable, as
required in Section 1-02 6, or if the documentation that is submitted fads to
demonstrate that a Good Faith Effort to meet the Condition of Award was made,
k The Bid Proposal does not constitute a definite and unqualified offer to meet the
material terms of the B�d invitation, or
I More than one proposal is submitted for the same pro�ect from a Bidder under the
same or different names
1-02 14 D�squal�fecation of Bidders
(March 8, 2013 APWA GSP, Optron 8)
Delete this Section and replace it with the follow�ng
A Bidder will be deemed not responsible if the Bidder does not meet the mandatory bidder
responsibility criteria in RCW 39 04 350(1), as amended, or does not meet the following
Supplemental Critena
1 Del�nquent State Taxes
A Criterion The Bidder shall not owe delinquent taxes to the Washington State
Department of Revenue without a payment plan approved by the Department of
Revenue
B Documentation The Bidder shall not be listed on the Washington State
Department of Revenue's "Delinquent Taxpayer List" website
http I/dor wa gov/content/fdeandpaytaxes/latefiling/dtlwest aspx , or if they are so
I�sted, they must submit a written payment plan approved by the Department of
Revenue, to the Contracting Agency by the deadime listed below
C►ty of Bremerton Bremerion Pro�ect No 6187
BVR and LFR Preservatron Pro�ect /l!-8 September 2013
Confract Documents Drv►s�on 1
'
,
�
2 Federal Debarment
A Criterion The Bidder shali not currently be debarred or suspended by the
Federal government
B Documentation The Bidder shall not be listed as hav�ng an "active exclusion" on
' the U S government's "System for Award Management" database
(www sam gov)
,
�
�
�
L_J
i
�J
�
�
'
�
�
'
3 Subcontractor Responsibilitv
A Criterion The B�dder's standard subcontract form shail �nclude the subcontractor
responsibdity language required by RCW 39 06 020, and the Bidder shall have
an established procedure which it utilizes to validate the responsibdity of each of
its subcontractors The Bidder's subcontract form shall also include a
requirement that each of its subcontractors shall have and document a simdar
procedure to determine whether the sub-tier subcontractors with whom it
contracts are also "responsible" subcontractors as defined by RCW 39 06 020
B Documentation The Bidder, if and when required as detaded below, shall submit
a copy of its standard subcontract form for review by the Contracting Agency,
and a written description of its procedure for validating the responsibility of
subcontractors with which it contracts
4
Preva�l�na Wa�es
A Criterion The Bidder shall not have a record of prevading wage violations as
determined by WA Labor & Industries in the five years prior to the bid submittal
date, that demonstrates a pattern of fading to pay workers prevading wages,
uniess there are extenuatmg circumstances and such circumstances are deemed
acceptable to the Contracting Agency
B Documentat�on The Bidder, if and when reqwred as detaded below, shall submit
a list of ail prevad�ng wage violations m the five years prior to the bid submittal
date, along with an explanation of each violation and how it was resolved The
Contracting Agency wdl evaluate these explanations and the resolution of each
complaint to determine whether the v�olation demonstrate a pattern of failing to
pay its workers prevading wages as required
5
Claims As�a�nst Retainaqe and Bonds
A Criterion The Bidder shall not have a record of excessive claims filed against the
retainage or payment bonds for public works pro�ects m the three years prior to
the bid submittal date, that dernonstrate a lack of effective management by the
B�dder of making timely and appropriate payments to its subcontractors,
suppliers, and workers, unless there are extenuatmg circumstances and such
circumstances are deemed acceptable to the Contracting Agency
' C�ty of Bremerton
BVR and LFR Preservafion Pro/ect
Contrect Documents
lll-9
Bremerton P%/ect No 6187
September 2013
D�v�s�on 1
,
B Documentation The Bidder, �f and when required as detaded below, shall submit
a list of the public works pro�ects completed in the three years prior to the bid
submfttal date that have had claims against retainage and bonds and include for
each pro�ect the followmg mformation
• Name of pro�ect
• The owner and contact mformation for the owner,
• A list of claims filed against the retainage and/or payment bond for any of
the pro�ects Irsted,
• A written explanation of the circumstances surrounding each claim and
the ultimate resolution of the claim
[�
7
0
Public Bidd�nq Crime
A Criterion The Bidder and/or �ts owners shall not have been convicted of a crime
involving bidding on a public works contracfi in the �ve years prior to the bid
submittai date
B Documentation The Bidder, if and when required as detaded below, shail sign a
statement (on a form to be provided by the Contracting Agency) that the Bidder
and/or its owners have not been convicted of a crime involving bidding on a
public works contract
Terminat�on for Cause / Term�nation for Default
A Criterion The Bidder shali not have had any public works contract termmated for
cause or terminated for default by a government agency in the five years prior to
the bid subm�ttal date, unless there are extenuating circumstances and such
circumstances are deemed acceptable to the Contracting Agency
B Documentation The Bidder, if and when required as detaded below, shall sign a
statement (on a form to be provided by the Contracting Agency) that the Bidder
has not had any public works contract terminated for cause or terminated for
default by a government agency m the five years prior to the bid submittal date,
or if Bidder was terminated, describe the circumstances
Lawsuits
A Criterion The Bidder shall not have lawsuits with �udgments entered agamst the
Bidder in the five years prior to the bid submittal date that demonstrate a pattern
of fad�ng to meet the terms of contracts, unless there are extenuating
circumstances and such circumstances are deemed acceptable to the
Contracting Agency
B Documentation The Bidder, if and when required as detaded below, shall sign a
statement (on a form to be provided by the Contracting Agency) that the Bidder
has not had any lawsuits with �udgments entered against the Bidder in the five
years prior to the bid submitta( date that demonstrate a pattern of fading to meet
the terms of contracts, or shall submit a list of all lawsuits with Judgments entered
C►ty of Bremerton Bremerton Pro�ecf No 6187
BVR and LFR Preservatron Pro�ect lll-10 September 2013
Contract Documents D�wsron 1
'
�
�
against the Bidder in the five years prior to the bid submittal date, along with a
written explanation of the circumstances surroundmg each such lawsuit The
Contracting Agency shall evaluate these explanations to determme whether the
iawsu�ts demonstrate a pattern of fa�img to meet of terms of construction related
contracts
' As evidence that the Bidder meets the mandatory and supplemental responsibdity critena
stated above, the apparent two lowest Bidders must submit to the Contracting Agency by
12 00 P M(noon) of the second business day followmg the bid submittal deadime, a written
� statement venfymg that the Bidder meets all of the mandatory and supplemental criteria
together with supporting documentation mciudmg but not fimited to that detaded above
(sufficient in the sole �udgment of the Contracting Agency) demonstrating compliance with
' ail mandatory and supplemental responsibdity criteria The Contractmg Agency reserves the
right to request such documentat�on from other Bidders as well, and to request further
documentat�on as needed to assess Bidder responsibility The Contractmg Agency also
, reserves the right to obtain information from third-parties and independent sources of
mformation concernmg a Bidder's compliance with the mandatory and supplemental criteria,
and to use that mformation in their evaluation The Contracting Agency may (but is not
� required to) consider mitigating factors in determinmg whether the Bidder complies with the
requirements of the supplemental cnteria
The basis for evaluation of Bidder comptiance with these mandatory and supplemental
' criteria shall include any documents or facts obtained by Contractmg Agency (whether from
the Bidder or third parties) including but not limited to (i) financial, histoncal, or operational
data from the Bitider, (u) information obtamed directly by the Contracting Agency from others
' for whom the Bidder has worked, or other public agencies or pr�vate enterprises, and
(ui) any additional information obtained by the Contracting Agency which is believed to be
relevant to the matter
'
'
�
'
'
i
�
If the Contracting Agency determines the Bidder does not meet the bidder responsibdity
criteria above and is therefore not a responsible Bidder, the Contracting Agency shall notify
the Bidder in writmg, with the reasons for its determination If the Bidder disagrees with this
determination, it may appeal the determination withm two (2) busmess days of the
Contracting Agency's determmation by presentmg its appeaf and any add�tional information
to the Contracting Agency The Contracting Agency will consider the appeal and any
additional mformation before issuing its final determination If the final determination affirms
that the B�dder is not responsible, the Contractmg Agency wdl not execute a contract with
any other Bidder until at least two business days after the Bidder determined to be not
responsible has received the Contractmg Agency's final determination
Request to Change Supplemental Bidder Responsibdity Critena Prior To Bid Bidders with
concerns about the relevancy or restrictiveness of the Supplemental Bidder Responsibility
Cntena may make or submit requests to the Contractmg Agency to modify the criteria Such
requests shaii be m writing, describe the nature of the concerns, and propose specific
modifications to the criter�a B�dders shall submit such requests to the Contracting Agency
no later than five (5) business days prior to the bid submittai deadline and address the
request to the Pro�ect Engineer or such other person designated by the Contractmg Agency
in the Bid Documents
� City of Bremerton
BVR and LFR Preservation Pro�ect
Contract Documents
111-11
Bremerton Pro�ect No 6187
September 2013
D�ws�on 1
1
'
1-02 15 Pre-Award Information
(August 14, 2013 APWA GSP)
Revise this section to read
Before awarding any contract, the Contracting Agency may require one or more of these
items or actions of the apparent lowest responsible bidder
A compiete statement of the origin, composition, and manufacture of any or ail
mater�als to be used,
2 Samples of these matenals for quality and fitness tests,
3 A progress schedule (in a form the Contracting Agency requires) showing the order
of and time required for the various phases of the work,
4 A breakdown of costs assigned to any bid item,
5 Attendance at a conference with the Engineer or representatives of the Engineer,
6 Obtam, and furnish a copv of, a business license to do business in the citv or countv
where the work is located
7 Any other information or action taken that is deemed necessary to ensure that the
bidder is the lowest responsible bidder
1-03 AWARD AND EXECUTION OF CONTRACT
1-03 1 Consideration of Bids
(January 23, 2006 APWA GSP)
Rev�se the first paragraph to read
After opening and reading proposals, the Contracting Agency wiil check them for
carrectness of extensions of the pnces per unit and the total pnce If a discrepancy exists
between the pnce per urnt and the extended amount of any bid item, the pnce per urnt wdl
control If a mmimum bid amount has been established for anv item and the bidder's unit or
lump sum pnce is less than the minimum specified amount, the Contractinc� Aqencv will
unilaterallv revise the urnt or lump sum pr�ce, to the mm�mum sqecified amount and
recalculate the extension The total of extensions, corrected where necessary, inciudinq
sales taxes where applicabie and such add�tives and/or alternates as selected bv the
Contracting AQencv, wdl be used bv the Contractinct Agencv for award purposes and to fix
the Awarded Contract Price amount and the amount of the contract bond
r
�
�
�
'
'
�
�
'
�
�
'
���
,
�
�
City of Bremerton
BVR and LFR Presenration Pro/ect
Contract Documents
lll-12
Bremerton Pro�ect No 6187 �
September 2013
D�v►s►on 1
�_�
��
1
,
1
L�
'
'
�
'
�
'
'
'
'
,
1-03 3 Execution of Contract
(October 9, 2005 APWA GSP)
Revise this section to read
Until the Contracting Agency executes a contract, no proposal shall bmd the Contracting
Agency nor shall any work begin withm the pro�ect limits or within Contracting Agency-
furrnshed sites The Contractor shali bear all risks for any work begun outside such areas
and for any materials o�dered before the contract is executed by the Contracting Agency
If the bidder experiences circumstances beyond their control that prevents return of the contract
documents within the calendar days after the award date stated above, the Contracting Agency
may grant up to a maximum of $$10$$ additional calendar days for retum of the documents,
provided the Contractmg Agency deems the circumstances warrant it
1-03 4 Contract Bond
(October 9, 2005 APWA GSP)
Revise the first paragraph to read
The successful bidder shall provide an executed contract bond for the full contract amount
This contract bond shall
1 Be on a Contracting Agency-furnished form,
2 Be signed by an approved surety (or sureties) that
a Is registered with the Washmgton State Insurance Commissioner, and
b Appears on the current Authorized Insurance List in the State of Washmgton
published by the Office of the Insurance Commissioner,
3 Be conditioned upon the faithful perf'ormance of the contract by the Contractor within
the prescribed time,
4 Guarantee that the surety shall indemnify, defend, and protect the Contractmg
Agency against any ciaim of direct or indirect loss resulting from the failure
' a Of the Contractor (or any of the employees, subcontractors, or lower tier
subcontractors of the Contractor) to faithfully perform the contract, or
b Of the Contra�tor (or the subcontractors or lower tier subcontractors of the
, Contractor) to pay ali laborers, mechanics, subcontractors, lower tier
subcontractors, materialperson, or any other person who provides supplies or
provisions for carrymg out the work,
' C�ty of Bremerton
BVR and LFR Pieseivat�on Pro�ect
Contract Documents
lll-13
8remerton Prufect No 6187
September 2013
D�v�s�on i
'
Within $$5$$ calendar days after the award date, the successful bidder shall return the
signed Contractmg Agency-prepared contract, an insurance certification as required by
Section 1-07 18, and a satisfactory bond as required by law and Section 1-03 4 Before
execution of the contract by the Contracting Agency, the successfu{ bidder shall provide any
pre-award information the Contracting Agency may require under Section 1-02 15
'
5
,�
,
�
'
Section 1-03 4 is suppiemented with the followmg
(August 5, 2013)
Release of Contract Bond will be 60 days followmg the Contract Completion date and
Notice of Completion (NOC) bemg sent to the Washington State Department of Labor and
Industries, Washington State Deparkment of Revenue and Washmgton State Employment
Security Department, provided following conditions are met
Payment to the State with respect to taxes imposed pursuant to Title 82, RCW on
Contracts totalmg more than $ 35,000, a release has been obtained from the
Washington State Department of Revenue
2 Affidavits of Wages Paid for the Contractor and all Subcontractors are on file with the
Contracting Agency (RCW 39 12 040)
3 A certificate of Payment of Contributions Penalties and Interest on Public Works
Contract is received from the Washington State Employment Security Department
4 Washington State Department of Labor and Industr�es (per Section 1-07 10) shows
the Contractor, Subcontractor(s) and any lower tier Subcontractor(s) are current with
payments of industrial insurance and medical aid premiums
5 All claims, as provided by law, filed against the Cont�act Bond have been resolved
1-04 SCOPE OF THE WORK
1-04 2 Coordinat�on of Contract Documents, Plans, Special Prov�sions,
Spec�fications, and Addenda
(March 93, 2012 APWA GSP)
Revise the second paragraph to read
Any mconsistency m the parts of the contract shail be resoived by foilowing this order of
precedence (e g, 1 presiding over 2, 2 over 3, 3 over 4, and so forth)
1 Addenda,
2 Proposal Form,
3 Special Provisions,
4 Contract Plans,
5 Amendments to the Standard Specifications,
6 Standard Specifications,
7 Contractinp Aqencv's Standard Plans or Detaiis (if anv) and
8 WSDOT Standard Plans for Road. Bridge, and Municipal Construction
City of Bremerton
BVR and LFR Presenraf�on Pro�ect
Contract Documents
Ill-14
'
,
,
�
r
LJ
�
�
�-,
��
�
'
'
�
�
�
Br�merton Pro�ect No 6187 '
September 2013
D�ws�on 1
LJ
Be accompanied bv a power of attornev for the Suretv's officer empowered to siqn
the bond, and
'
� 1-05 CONTROL OF WORK
'
�_ J
�
r
�
'
1-05 7 Removal of Defect�ve and Unauthorized Work
(October 1, 2005 APWA GSP)
Supplement this section with the following
If the Contractor fails to remedy defective or unauthorized work within the time spec�fied in a
written notice from the Engineer, or fails to perform any part of the work required by the
Contract Documents, the Engineer may correct and remedy such work as may be identified
in the written notice, with Contractmg Agency forces or by such other means as the
Contracting Agency may deem necessary
If the Contractor fads to comply with a written order to remedy what the Engineer determines
to be an emergency situation, the Engmeer may have the defective and unauthorized work
corrected immediately, have the re�ected work removed and replaced, or have work the
Contractor refuses to perForm completed by using Contracting Agency or other forces An
emergency situation is any situation when, m the opinion of the Engmeer, a delay in its
remedy could be potentiaily unsafe, or might cause serious nsk of loss or damage to the
public
Direct or indirect costs incurred by the Contracting Agency attributable to correctmg and
' remedying defective or unauthorized work, or work the Contractor failed or refused to
perform, shall be paid by the Contractor Payment will be deducted by the Engmeer from
monies due, or to become due, the Contractor Such direct and indirect costs shall inciude �n
particular, but without limitation, compensation for additional professional services required,
� and costs for repair and replacement of work of others destroyed or damaged by correction,
removal, or replacement of the Contractor's unauthorized work
, No ad�ustment in contract time or compensation wdl be allowed because of the delay in the
performance of the work attributable to the exercise of the Contractmg Agency's rights
provided by this Section
�
'
'
J
The rights exercised under the provisions of this section shall not diminish the Contracting
Agency's right to pursue any other avenue for additional remedy or damages with respect to
the Contractor's failure to perForm the work as required
1-0511 Finallnspect�on
Delete this section and replace it with the foilowmg
1-05 11 Final Inspections and Operat�onal Testing
(October 1, 2005 APWA GSP)
1-05.11(1) Substantiai Complet�on Date
' When the Contractor considers the work to be substantially complete, the Contractor shall
so notify the Engineer and request the Engineer establish the Substantial Completion Date
The Contractor's request shall list the specific items of work that remain to be completed �n
, order to reach physical completion The Engmeer will schedule an inspection of the work
with the Contractor to determine the status of completion The Engmeer may also establish
the Substantial Completion Date undaterally
' City of Sremerton
BVR and LFR Pr+eservahon Pro�ect
Contract Documents
ll!-15
8reme►fon Pro�ect No 6187
September 2013
D►ws�on 1
t
If, after this inspection, the Engmeer concurs with the Contractor that the work is
substantially complete and ready for its mtended use, the Engineer, by wr�tten notice to the
Contractor, will set the Substantial Completion Date If, after this mspection the Engmeer
does not consider the work substantially complete and ready for its intended use, the
Engineer wiil, by written notice, so notify the Contractor giving the reasons therefore
Upon receipt of written notice concurring in or denymg substantial completion, whichever �s
applicable, the Contractor shall pursue vigorously, diligently and without unauthorized
mterruption, the work necessary to reach Substantial and Physical Completion The
Contractor shali provide the Engineer with a revised schedule mdicating when the
Contractor expects to reach substantial and physical completion of the work
The above process shall be repeated until the Engineer establishes the Substantial
Completion Date and the Contractor considers the work physically complete and ready for
final mspection
1-0511(2) F�na! Inspection and Phys�cai Completion Date
When the Contractor considers the work physically complete and ready for final inspection,
the Contractor by written notice, shall request the Engineer to schedule a fmal inspection
The Engmeer w�ll set a date for final inspection The Engmeer and the Contrac#or will then
make a final mspection and the Engineer wdl notify the Contractor in writing of all particulars
in which the final inspection reveals the work incomplete or unacceptable The Contractor
shall immediately take such corrective measures as are necessary to remedy the listed
deficrencies Corrective work shal! be pursued vigorously, dil�gently, and w�thout interruption
until physical completion of the listed deficiencies This process wdl continue untd the
Enginee� is satisfied the listed deficiencies have been corrected
If action to correct the fisted deficienc�es is not init�ated within 7 days after rece�pt of the
written notice listing the deficiencies, the Engmeer may, upon wr�#ten notice to the
Contractor, take whatever steps are necessary to correct those deficiencies pursuant to
Section 1-05 7
The Contractor will not be allowed an extension of contract time because of a delay in the
performance of the work attributable to the exerase of the Engineer's right hereunder
Upon correcfion of all deficiencies, the Eng�neer wdl notrfy the Contractor and the
Contracting Agency, in writing, of the date upon which the work was considered physically
complete That date shall constitute the Physical Completion Date of the contract, but shall
not imply acceptance of the work or that a{I the obligations of the Contractor under the
contract have been fulfilled
1-0511(3) Operational Testing
it is the mtent of the Contractmg Agency to have at the Physical Compietion Date a
complete and operable system Therefore when the work involves the installation of
machinery or other mechanical equipment, street lighting, electrical distribution or signal
systems, irrigation systems, buddmgs, or other similar work it may be desirable for the
Engineer to have the Contractor operate and test the work for a period of time after finai
inspection but prior to the physical completion date Whenever items of work are listed in the
C�ty of Bremerton
BVR and LFR Preseivat�on Pro�ect
Contract Documents
llt-16
Bremerton Pro�ect No 6187 '
September 2013
D�v�sron 1
,
,
'
�
,
,
'
C J
�
'
'
Contract Provisions for operational testmg they shall be fully tested under operating
cond�tions for the time period specified to ensure their acceptabdity prior to the Physical
Completion Date During and following the test period, the Contractor shall correct any items
of workmanship, materials, or equipment which prove faulty, or that are not in first class
operatmg candition Equipment, electrical controls, meters, or other devices and equipment
to be tested during this period shall be tested under the observation of the Engmeer, so that
the Engineer may determme their suitability for the purpose for which they were mstalled
The Physical Completion Date cannot be established until testing and corrections have been
completed to the satisfaction of the Engineer
The costs for power, gas, labor, matenal, supplies, and everythmg else needed to
successfully complete operational testing, shall be mcluded in the unit contract pnces
related to the system bemg tested, unless specifically set forth otherwise in the proposal
Operational and test periods, when required by the Engineer, shall not affect a
manufacturer's guaranties or warranties furnished under the terms of the contract
1-0513 Superintendents, Labor, and Equipment of Contractor
(August 14, 2013 APWA GSP)
Delete the sixth and seventh paragraphs of this section
1-0515 Method of Serving Notices
(March 25, 2009 APWA GSP)
Revise the second paragraph to read
All correspondence from the Contractor shall be directed to the Pro�ect Engineer All
' correspondence from the Contractor constituting any not�fication, notice of protest, notice of
dispute, or other correspondence constituting notif�cation required to be furrnshed under the
Contract, must be in paper format, hand delivered or sent via mad delivery service to the
Pro�ect Engineer's office Electronic copies such as e-mads or electronically delivered copies
� of correspondence will not constitute such notice and will not comply with the requirements
of the Contract
'
'
�
'
�
�
Add the following new section
1-05 16 Water and Power New Sectoon
(October 1, 2005 APWA GSP)
The Contractor shall make necessary arrangements, and shall bear the costs for power and
water necessary for the performance of the work, unless the contract includes power and
water as a pay item
' City of Br�merton
BVR and LFR Preservat�on Pro/ect
Contrect Documents
1lI-17
Bremerton Pro�ect No 6187
September 2093
Drv�s�on 1
'
'
Add the following new section
1-0517 Oral Agreements
(October 9, 2005 APWA GSP)
L�
New Section '
No oral agreement or conversation with any officer, agent, or employee of the Contracting
Agency, either before or after execution of the contract, shail affect or modify any of the
terms or obligations contained m any of the documents compr�sing the contract Such oral
agreement or conversation shall be considered as unofficial information and m no way
bmdmg upon the Contractmg Agency, unless subsequentiy put in writing and signed by the
Contracting Agency
1-06 CONTROL OF MATERIAL
Section 1-06 is supplemented with the following
Buy Amereca
(August 6, 2012 WSDOT GSP, Opt�on A)
in accordance with Buy America requirements contained in 23 CFR 635 410, the ma�or
quantities of steel and iron construction material that is permanently incorporated into the
pro�ect shall consist of American-made materials only Buy Amenca does not apply to
temporary steel items, e g, temporary sheet pdmg, temporary bndges, steel scaffolding and
falsework
Minor amounts of foreign steel and iron may be utdized in this pro�ect provided the cost of
the foreign materiai used does not exceed one-tenth of one percent of the total contract cost
or $2,500 00, whichever is greater
American-made material is defined as material havmg ail manufacturing processes
occurring domestically To further define the coverage, a domestic product is a
manufactured steel matenal that was produced in one of the 50 States, the District of
Columbia, Puerto Rico, or in the territories and possessions of the United States
If domestically produced steel billets or iron ingots are exported outside of the area of
coverage, as defined above, for any manufacturing process then the resultmg product does
not conform to the Buy America requirements Additionally, products manufactured
domestically from foreign source steel billets or iron �ngots do not conform to the Buy
America requirements because the initiai melting and m�xing of alloys to create the material
occurred in a foreign country
Manufacturing begins with the irntial melting and mixing, and continues through the coating
stage Any process which modifies the chemical content, the physical size or shape, or the
final fmish is considered a manufacturmg process The processes mclude rolling, extruding,
machining, bending, grinding, drdling, welding, and coating The action of applying a coating
to steel or iron is deemed a manufactur�ng process Coating includes epoxy coatmg,
gaivarnzing, aluminizmg, painting, and any other coatmg that protects or enhances the value
of steel or iron Any process from the original reduction from ore to the fmished product
constitutes a manufactunng process for iron
Due to a nationw�de waiver, Buy Amenca does not apply to raw materials (iron ore and alloys),
scrap (recycied steel or iron), and pig iron or processed, pelletized, and reduced iron ore
C�ty of Bremerton Bremerton Pro�ect No 6187
BVR and LFR Preservat�on Pro�ect 1I1-18 September 2013
Contract Documents Div�sion 1
'
�
�
'
�
,
�
�
�
'
'
�
'
�
�-,
�
�1
'
,
�
,
,
,
Ir J
�
�
1
,
��
�
�
'
The foliowing are considered to be steel manufacturmg processes
1 Production of steel by any of the following processes
a Open hearth furnace
b Basic oxygen
c Electric furnace
d Direct reduction
2 Rolling, heat treatmg, and any other similar processing
3 Fabrication of the products
a
�
c
Spinrnng wire into cable or strand
Corrugating and roll�ng into culverts
Shop fabrication
A certification of materials origin wili be required for any items compnsed of, or containing,
steel or iron construction materiais prior to such items being incorporated into the permanent
work The certification shall be on DOT Form 350-109EF provided by the Engineer, or such
other form the Contractor chooses, provided it contains the same information as DOT Form
350-109EF
1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC
1-071 Laws to be Observed
(Ocfober 1, 2005 APWA GSP)
Supplement this section with the following
In cases of conflict between different safety regulations, the more stringent regulation shall
apply
The Washington State Department of Labor and Industries shall be the sole and paramount
admirnstrative agency responsible for the admirnstration of the provisions of the Washmgton
Industrial Safety and Health Act of 1973 (WISHA)
The Contractor shall mamtain at the pro�ect site office, or other well known place at the
' pro�ect site, all articles necessary for providing first aid to the in�ured The Contractor shall
estabiish, publish, and make known to all employees, procedures for ensunng immediate
removal to a hospital, or doctor's care, persons, inciuding employees, who may have been
' inJured on the proJect site Employees should not be permitted to work on the proJect site
before the Contractor has established and made known procedures for removai of in�ured
persons to a hospital or a doctor's care
'
, C�ty of B►�me�ton
BVR and LFR Preservahon Pro�ect
Contract Documents
lll-19
Bremerton Pro�ect No 6187
September 2013
D�visron 1
'
'
The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of the
Contractor's plant, appliances, and methods, and for any damage or in�ury resulting from
their failure, or improper maintenance, use, or operation The Contractor shall be solely and
completely responsible for the conditions of the pro�ect site, �ncluding safety for ail persons
and property in the performance of the work This requirement shall appiy continuously, and
not be limited to normal working hours The required or implied duty of the Engmeer to
conduct construction review of the Contractor's performance does not, and shall not, be
mtended to include review and adequacy of the Contractor's safety measures in, on, or near
the pro�ect site
1-07 2 State Taxes
Delete this section, mcludmg its sub-sections, in its entirety and replace it with the following
1-07 2 Sales Tax
(June 27, 2011 APWA GSP)
The Washmgton State Department of Revenue has issued speaal rules on the State sales
tax Sections 1-07 2(1) through 1-07 2(3) are meant to clarify those rules The Contractor
should contact the Washington State Department of Revenue for answers to questions m
this area The Contractmg Agency will not ad�ust its payment if the Contractor bases a bid
on a misunderstood tax liability
The Contractor shall mclude all Contractor-paid taxes in the unit bid pnces or other contract
amounts In some cases, however, state retad sales tax wdl not be included Section 1-07 2(2)
describes this exception
The Contractmg Agency will pay the retained percentage (or release the Contract Bond if a
FHWA-funded Pro�ect) only if the Contractor has obtained from the Washington State
Department of Revenue a certificate showmg that all contract-related taxes have been paid
(RCW 60 28 051) The Contractmg Agency may deduct from its payments to the Contractor
any amount the Contractor may owe the Washington State Department of Revenue,
whether the amount owed relates to this contract or not Any amount so deducted wdl be
paid into the proper State fund
1-07 2(1) State Sales Tax — Rule 171
WAC 458-20-171, and its related rules, apply to buildmg, repairing, or improving streets,
roads, etc , which are owned by a municipal corporation, or political subdivision of the state,
or by the United States, and which are used pnmardy for foot or vehicular traffic This
mcludes storm or combined sewer systems within and included as a part of the street or
road drainage system and power Imes when such are part of the roadway lighting system
For work performed in such cases, the Contractor shall mclude Washington State Retail
Sales Taxes in the various unit bid item pnces, or other contract amounts, including those
that the Contractor pays on the purchase of the materials, equipment, or supploes used or
consumed m doing the work
�
��
�
'
'
�I
II
�
�
,
L–J
�
�
�
,
�
�
�
LJ
C�ty of BremeRon
BVR and LFR Prese►vabon Pro�ect
Contract Documents
Ill-20
Bremerton Pro�ect No 6187 '
September 2013
D�vrsron 1
C�
�
'
1-07 2(2) State Sales Tax — Rule 170
' WAC 458-20-170, and its related rules, apply to the constructing and repairing of new or
existing buddings, or other structures, upon real property This includes, but is not limited to,
the construction of streets, roads, highways, etc , owned by the state of Washington, water
mains and their appurtenances, sanitary sewers and sewage disposal systems unless such
' sewers and disposal systems are within, and a part of, a street or road drainage system,
telephone, telegraph, electrical power distribution Imes, or other conduits or lines m or above
streets or roads, unless such power lines become a part of a street or road lighting system,
' and instaliing or attachmg of any article of tangible personal property m or to real property,
whether or not such personal property becomes a part of the realty by virtue of mstallation
, For work performed m such cases, the Contractor shail collect from the Contractmg Agency,
retail sales tax on the full contract price The Contracting Agency will automatically add this
sales tax to each payment to the Contractor For this reason, the Contractor shall not
, mclude the retail sales tax m the unit bid item prices, or in any other contract amount sub�ect
to Rule 170, with the followmg exception
�
�
Exception The Contractmg Agency will not add in sales tax for a payment the Contractor or
a subcontractor makes on the purchase or rental of tools, machinery, equipment, or
consumable supplies not integrated into the pro�ect Such sales taxes shall be mcluded in
the unit bid item pnces or m any other contract amount
1-07 2(3) Services
' The Contractor shall not collect retad sales tax from the Contractmg Agency on any contract
whoily for professional or other services (as defined in Washmgton State Department of
Revenue Rules 138 and 244)
� 1-07 9 Wages
1
'
�J
�
��
�
1-07 9(1) General
Section 1-07 9(1) is supplemented with the following
(January 8, 2013 WSDOT GSP)
The Federal wage rates incorporated in this contract have been establ�shed by the
Secretary of Labor under Urnted States Department of Labor General Decision
No WA130001
The State rates incorporated m this contract are appl�cable to all construct�on activities
associated with this contract
' City of Bremerton
BVR and LFR Prese►vat�on Pro�ect
Contract Documents
lll-21
Bremerton Pro/ect No 6187
September 2013
D�wsion 1
'
�
1-0711 Requerements for Nond�scrimina#�on
Section 1-07 11 is supplemented with the following
(August 5, 2013 WSDOT GSP, Opt�on 9)
Requirement for Affirmative Action to Ensure Equal Employment Opportunitv (Executive
Order 11246)
1 The Contractor's attention is called to the Equal Opportunity Clause and the Standard
Federal Equal Employment Opportunity Construction Contract Specifications set forth
herein
2 The goals and timetables for minority and female participation set by the Office of
Federal Contract Compliance Programs, expressed in percentage terms for the
Contractor's aggregate work force in each construction craft and in each trade on all
construction work in the covered area, are as follows
Women - Statewide
Timetable
Goal
Untd further notice 6 9%
Minorities - bv Standard Metropolitan Statistical Area (SMSA)
Spokane, WA
SMSA Counties
Spokane, WA 2 8
WA Spokane
Non-SMSA Counties 3 0
WA Adams, WA Asotin, WA Columbia, WA Ferry, WA Garfield, WA
Lincoln, WA Pend Oredle, WA Stevens, WA Whitman
Richland, WA
SMSA Counties
Richland Kennewick, WA
WA Benton, WA Franklin
Non-SMSA Counties
WA Walla Walla
54
36
Yakima, WA
SMSA Counties
Yakima, WA 9 7
WA Yakima
Non-SMSA Counties 7 2
WA Chelan, WA Douglas, WA Grant, WA Kittitas, WA Okanogan
�
�
'
'
�
'
�
�
I�
,_ i
�
�
'
'
LJ
�
�
'
�
Ciry of 8remerton
BVR and LFR Preservarion Pro�ect
Contract Documents
111-22
Bremerton Prolect No 6187 '
September 2013
D�v►s�on 1
'
�
�
'
'
�
'
,
'
1
�
�
�
,
1
�
Seattie, WA
SMSA Counties
Seattle Everett, WA 7 2
WA King, WA Snohomish
Tacoma, WA 6 2
WA Pierce
Non-SMSA Counties 6 1
WA Clallam, WA Grays Harbor, WA island, WA Jefferson, WA Kitsap,
WA Lewis, WA Mason, WA Pacific, WA San Juan, WA Skagit, WA
Thurston, WA Whatcom
Portland, OR
SMSA Counties
Portland, OR-WA
WA Clark
Non-SMSA Counties
WA Cowlitz,
45
38
WA Klickitat, WA Skamania, WA Wahkiakum
These goals are applicable to each nonexempt Contractor's totaf on-site construction
workforce, regardless of whether or not part of that workforce is performing work on a
Federal, or federally assisted pro�ect, contract, or subcontract untd further notice
Compliance with these goals and time tables is enforced by the Office of Federal
Contract compliance Programs
The Contractor's compliance with the Executive Order and the regulations in 41 CFR
Part 60-4 shall be based on its implementation of the Equal Opporturnty Clause, specific
affirmative action obligations required by the specifications set forth in 41 CFR 60-4 3(a),
and its efforts to meet the goals The hours of minority and female employment and
training must be substantially uniform throughout the length of the contract, m each
construction craft and in each trade, and the Contractor shall make a good fa�th effort to
employ minorities and women evenly on each of its proJects The transfer of minority or
female employees or trainees from Contractor to Contractor or from pro�ect to pro�ect for
the sole purpose of ineeting the Contractor's goal shall be a violation of the contract, the
Executive Order and the regulations in 41 CFR Part 60-4 Compliance with the goals
wdl be measured against the total work hours performed
3 The Contractor shall provide written notification to the Office of Federal Contract
Compliance Programs (OFCCP) within 10 working days of award of any construction
subcontract in excess of $10,000 or more that are Federally funded, at any tier for
construction work under the contract resulting from this solicitation The notification shail
list the name, address and telephone number of the Subcontractor, employer
identification number of the Subcontractor, estimated dollar amount of the subcontract,
estimated starting and completion dates of the subcontract, and the geographical area in
which the contract is to be performed The notification shall be sent to
U S Department of Labor
, Office of Federal Contract Compliance Programs Pacific Region
Attn Regional Director
San Francisco Federal Budding
' 90 — 7th Street, Suite 18-300
San Franasco, CA 94103(415) 625-7800 Phone
(415) 625-7799 Fax
, Gty of Bremerton
BVR and LFR Preservatron Pro�ect
Contracf Documents
lll-23
Bremerton Pro�ect No 6187
September 2013
D�vrsion 1
1
�
Additional mformation may be found at the U S Department of Labor website
httq //www dol gov/ofccp/TAquides/ctaquide htm
4 As used m this Natice, and in the contract resulting from this solicitation, the Covered
Area is as designated herein
Standard Federal Equal EmploVment OpportunitY Construction Contract Specifications
(Executive Order 11246)
1 As used in these specifications
a Covered Area means the geographical area descnbed in the solicitation from which
this contract resulted,
b Director means Director, Off�ce of Federal Contract Compliance Programs, United
States Department of Labor, or any person to whom the Director delegates authority,
c Employer fdentification Number means the Federal Social Security number used on
the Employer's Quarterly Federal Tax Return, U S Treasury Department Form 941,
d Mmority includes
(1) Black, a person havmg orrgins in any of the Black Racial Groups of Africa
(2) Hisparnc, a fluent Spanish speaking, Span►sh surnamed person of Mexican,
Puerto Rican, Cuban, Central American, South American, or other Sparnsh
ongin
(3) Asian or Pacific Islander, a person having origins in any of the original peopies of
the Pacific nm or the Pacific Islands, the Hawaiian Islands and Samoa
(4) American Indian or Alaskan Native, a person havmg origins in any of the origmal
peoples of North America, and who maintain cultural identification through tribal
a�liation or community recognition
2 Whenever the Contractor, or any Subcontractor at any tier, subcontracts a portion of the
work involvmg any construction trade, it shall physically include m each subcontract in
excess of $10,000 the provisions of these specifications and the Notice which contams
the applicable goals for minority and female participation and which is set forth in the
solicitations from which this contract resulted
3 If the Contractor is participating (pursuant to 41 CFR 60-4 5) m a Hometown Plan
approved by the U S Department of Labor m the covered area either individually or
through an association, its affirmative action obiigations on all work in the Plan area
(including goals and timetables) shall be m accordance with that Plan for those trades
wh�ch have urnons participating in the Plan Contractors must be able to demonstrate
their participation in and compliance with the provisions of any such Hometown Plan
Each Contractor or Subcontractor participating in an approved Plan is indwidually
required to comply with its obligations under the EEO clause, and to make a good faith
effort to achieve each goal under the Plan m each trade in which it has employees The
C�ty of Bremerton
BVR and LFR Preservahon Pro�ect
Contract Documents
lll-24
1
,
'
�
'
�
�
�
�,
�
�
�
�
�
'
�
'
,
Bremerton Pro�ect No 6187 '
September 2013
Drvisron 1
,
1
,
'
'
��
�
�
�
�
�
overall good faith performance by other Contractors or Subcontractors toward a goal m
an approved Plan does not excuse any covered Contractor's or Subcontractor's fadure to
take good faith effort to achieve the Plan goals and timetables
4 The Contractor shall implement the specific affirmative action standards prowded in
paragraphs 7a through 7p of this Special Provision The goals set forth in the solic�tation
from which this contract resulted are expressed as percentages of the total hours of
employment and trairnng of mmority and female utdization the Contractor should
reasonably be able to achieve m each construction t�ade in which it has employees in
the covered area Covered construction contractors performing construction work in
geographicai areas where they do not have a Federal or federally assisted construction
contract shall apply the minority and female goals established for the geographical area
where the work is being performed The Contractar is expected to make substantially
uniform progress in meetmg its goals �n each craft during the period specified
5 Neither the provisions of any collective bargainmg agreement, nor the failure by a urnon
with whom the Contractor has a collective bargaining agreement, to refer either
mmorities or women shall excuse the Contractor's obligations under these spec�fications,
Executive Order 11246, or the regulations promulgated pursuant thereto
6 In order for the nonworking trairnng hours of apprentices and trainees to be counted in
meeting the goals, such apprentices and trainees must be employed by the Contractor
during the trammg period, and the Contractor must have made a commitment to employ
the apprentices and trainees at the completion of their trairnng, sub�ect to the avadabdity
of employment opporturnties Tra�nees must be trained pursuant to training programs
approved by the U S Department of Labor
7 The Contractor shall take specific affirmative actions to ensure equal employment
� opporturnty The evaluation of the Contractor's compliance with these specifications
shall be based upon its effort to achieve maximum results from its action The
Contractor shall document these efforts fully, and shall �mplement affirmative action
�
'
'
t
�
1
,
steps at least as extensive as the followmg
a Ensure and maintain a working env�ronment free of harassment, mtimidation, and
coercion at all sites, and in all facilities at which the Contractor's employees are
assigned to work The Contractor, where possible, wili assign finro or more women to
each construction pro�ect The Contractor shall specifically ensure that all foremen,
supermtendents, and other on-site supervisory personnel are aware of and carry out
the Contractor's obligation to maintain such a workmg environment, with specific
attention to minority or female individuals workmg at such sites or in such facdities
b Establish and mamtain a current list of minority and female recruitment sources,
provide written notification to minority and female recruitment sources and to
commun�ty organizations when the Contractor or its urnons have employment
opporturnties avadable, and mamtain a record of the organizations' responses
c Maintam a current file of the names, addresses and telephone numbers of each
minority and female off-the-street applicant and minority or female referral from a
union, a recruitment source or commurnty organization and of what action was taken
with respect to each such individual If such individual was sent to the union hiring
C�ty of Bremerton Bremerton Pro�ect No 6187
BVR and LFR Preservation Pro�ect !11-25 September 2013
Contract Documents D�v�sion 1
�
'
hall for referral and was not referred back to the Contractor by the union or, if
referred, not employed by the Contractor, this shall be documented in the file with the
reason therefor, along with whatever additional actions the Contractor may have
taken
d Provide immediate written notification to the Director when the urnon or unions with
which the Contractor has a collective bargaming agreement has not referred to the
Contractor a minority person or woman sent by the Contractor, or when the
Contractor has other information that the union referral process has impeded the
Contractor's efforts to meet its obligations
e Develop on-the �ob trainmg opportunity and/or participate m trairnng programs for the
area which expressly include minorities and women, includtng upgradmg programs
and apprenticesh�p and tramee programs relevant to the Contractor's employment
needs, especialiy those programs funded or approved by the U S Department of
Labor The Contractor shall provide notice of these programs to the sources
compded under 7b above
Dissemmate the Contracto�'s EEO policy by providing notice of the policy to unions
and training programs and requesting their cooperation in assisting the Contractor in
meetmg its EEO obligations, by including it in any policy manual and collective
bargaining agreement, by publ�cizing it in the company newspaper, annual report,
etc , by specific review of the policy with all management personnel and with ali
minority and female employees at least once a year, and by post�ng the company
EEO policy on bulletin boards accessible to all employees at each location where
construction work is performed
g Review, at least annually, the company's EEO policy and affirmative action
obligations under these specifications with all employees having any responsibdity
for hiring, assignment, layoff, termination or other employment dec�sions including
specific review of these �tems with on-site supervisory personnel such as
Superintendents, General Foremen, etc , prior to the initiation of construction work at
any �ob site A written record shall be made and mamtained identifying the time and
place of these meetings, persons attendmg, sub�ect matter discussed, and
disposition of the sub�ect matter
h Disseminate the Contractor's EEO policy externally by mciuding it in any advertising
in the news media, specifically including minority and female news media, and
providing written notification to and discussing the Contractor's EEO policy with other
Contractors and Subcontractors with whom the Contractor does or anticipates domg
business
Direct its recruitment efforts, both oral and written ta minority, female and commurnty
organizations, to schools with mmority and female students and to minority and
female recruitment and trairnng organizations serving the Contractor's recruitment
area and employment needs Not later than one month prior to the date for the
acceptance of applications for apprenticeship or other trairnng by any recruitment
source, the Contractor shall send written notification to orgarnzations such as the
above, descnbing the openings, screening procedures, and tests to be used m the
selection process
Ciry of Bremerton
BVR and LFR Presenrat�on Pro�ect
Contract Documents
!11-26
� _J
'
�
��
�
�
�
�
��
LJ
�
�
�
'
'
J
Bremerton Pro/ect No 6187 '
September 2013
Diws�on 1
�
�
'
�
�
�
,�
� Encourage present minority and female employees to recruit other mmority persons
and women and where reasonable, provide after school, summer and vacation
employment to minority and female youth both on the site and in other areas of a
Contractor's work force
k Validate all tests and other selection requirements where there is an obligation to do
so under 41 CFR Part 60-3
Conduct, at least annually, an inventory and evaluation of all minority and female
personnel for promotional opportunities and encourage these employees to seek or
to prepare for, through appropriate trairnng, etc , such opportunities
m Ensure that seniority practices, �ob classifications, work assignments and other
� personnel practices, do not have a discriminatory effect by continually morntoring all
personnel and employment related activities to ensure that the EEO policy and the
Contractor's obligations under these specifications are being carried out
��
�
�
r
�
�
�J
�
�
�
�
r-�
I �
n Ensure that all facdities and company activities are nonsegregated except that
separate or single-user todet and necessary changing facilities shall be provided to
assure privacy between the sexes
o Document and maintain a record of all solicitations of offers for subcontracts from
mmority and female construction contractors and suppliers, mcluding circulation of
solicitations to mmority and female contractor associations and other business
associations
p Conduct a review, at least annually, of all supervisors' adherence to and
performance under the Contractor's EEO policies and affirmative action obligations
8 Contractors are encouraged to participate m voluntary associations which assist in
fulfillmg one or more of their affirmative action obligations (7a through 7p) The efforts of
a contractor association, �omt contractor-union, contractor-community, or other similar
group of which the Contractor is a member and participant, may be asserted as fulfilling
any one or more of the obligations under 7a through 7p of this Special Provision
provided that the Contractor actively participates in the group, makes every effort to
assure that the group has a positive impact on the employment of minorities and women
in the mdustry, ensure that the concrete benefits of the program are reflected in the
Contractor's minority and female work-force participation, makes a good faith effort to
meet its individual goals and timetables, and can provide access to documentation which
demonstrate the effectiveness of actions taken on behalf of the Contractor The
obligation to comply, however, is the Contractor's and fadure of such a group to fulfill an
obligation shall not be a defense for the Contractor's noncompliance
9 A single goai for minorities and a separate single goal for women have been established
The Contractor, however, is required to provide equal employment opportunity and to
take affirmative action for all minority groups, both male and female, and all women, both
minority and non-minority Consequentiy, the Contractor may be m violation of the
Executive Order if a particular group is employed in substantially disparate manner (for
example, even though the Contractor has achieved its goals for women generaily, the
Contractor may be in violation of the Executive Order if a specific mmority group of
women is underutilized)
, C►ty of Biemerton
BVR and LFR P�servat�on Pro/ecf
Contract Documents
1/I-27
Bremerton Pro�ect No 6187
September 2013
Diwsion 1
�
r,
�
10 The Contractor shall not use the goals and timetables or affirmative action standards to
discriminate against any person because of race, color, religion, sex, or national origin
11 The Contractor shall not enter into any subcontract with any person or firm debarred
from Government contracts pursuant to Execut�ve Order 11246
12 The Contractor shall carry out such sanctions and penalties for viotation of these
specifications and of the Equal Opportunity Clause, including suspensions, terminations
and cancellations of existing subcontracts as may be imposed or ordered pursuant to
Executive Order 11246, as amended, and its implementmg regulations by the Office of
Federal Contract Compliance Programs Any Contractor who fads to carry out such
sanctions and penalties shall be in violation of these specifications and Executive Order
11246, as amended
13 The Contractor, in fulfdling its obligations under these specifications, shall implement
specific affirmative action steps, at least as extensive as those standards prescribed m
paragraph 7 of this Special Provision, so as to achieve maximum results from its efforts
to ensure equal employment opporturnty If the Contractor fails to comply with the
requirements of the Executive Order, the implementing regulations, or these
specifications, the Director shall proceed in accordance with 41 CFR 60-4 8
14 The Contractor shall designate a responsible official to morntor all employment related
activity to ensure that the company EEO policy is being carried out, to submit reports
relating to the provisions hereof as may be required by the government and to keep
records Records shall at least mclude, for each employee, their name, address,
telephone numbers, construction trade, urnon affiliation if any, employee identification
number when assigned, social security number, race, sex, status (e g, mechanic,
apprentice, trainee, helper, or laborer), dates of changes in status, hours worked per
week in the indicated trade, rate of pay, and locat�ons at which the work was performed
Records shall be maintamed in an easdy understandable and retrievable form, however,
to the degree that existmg records satisfy this requ�rement, the Contractors wdl not be
required to maintam separate records
15 Nothing herem provided shall be construed as a limitation upon the application of other
laws which establish different standards of compliance or upon the application of
requirements for the hiring of local or other area residents (e g, those under the Public
Works Employment Act of 1977 and the Commurnty Development Block Grant
Program)
16 Additional assistance for Federal Construction Contractors on contracts administered by
Washington State Department of Transportation or by Local Agencies may be found at
Washington State Dept of Transportation
Office of Equa! Opporturnty
PO Box 47314
310 Maple Park Ave SE
Olympia WA
98504-7314
Ph 360-705-7090
Fax 360-705-6801
http //www wsdot wa gov/equalopportunity/default htm
Gty of Bremerton
BVR and LFR Preservabon Pro�ect
Contract Documents
lll-28
�
�
�
�'
��
��,
�
�
��
�
�
�
�
f�
�
I -1
Bremerton Pro/ect No 6187 �
Sepfember 2013
Div�s�on 1
�j
�
'
�`
�
,�
�_�
��
LJ
L_�
L!
�
(May 7, 2012 WSDOT GSP, Opt�on 2)
D►sadvantaged Bus►ness Enterpnse Participat�on
The Disadvantaged Busmess Enterprise (DBE) requirements of 49 CFR Part 26 apply to this
Contract As such, the requirements of this Contract are to make affirmative efforts to solicit
DBEs, provide mformation on who submitted a Bid or quote and to report DBE participation
quarterly as described elsewhere in these Contract Provisions No preference wili be
mcluded m the evaluation of Bids/Proposals, no mmimum level of DBE participation shall be
required as a Condition of Award and Bids/Proposals may not be re�ected or considered
non-responsive on that basis
DBE Goals
No DBE goals have been assigned as part of this Contract
Affirmative Efforts to Solic�t DBE Partic�pation
DBE firms shall have an equal opportunity to compete for subcontracts in which the
Contractor enters into pursuant to this Contract
Contractors are encouraged to
Advertise opporturnties for Subcontractors or suppliers in a timely and reasonably
des�gned manner to provide notice of the opporturnty to DBEs capable of
performing the Work All advertisements should include a Contract Provision
encouraging participation by DBE firms This may be accomplished through
general advertisements (e g newspapers, �ournals, etc ) or by soliciting
Bids/Proposals directly from DBEs
Note A Directory of Certified DBE Firms denotmg the Description of Work the
DBE Contractors are certified to perForm is available at
www omwbe wa qov/certification/index shtml
� The directory provides a piain language on the Description of Work that
the listed DBE's have been certified by the Office of Minor�ty and
Women's Business Enterprises (OMWBE) to perForm
�
�
2 Establish delivery schedules that encourage part�cipation by DBEs and other
small businesses
3 Participate with a DBE as a �omt venture
DBE Eligib�lity/Select�on of DBEs for Report�ng Purposes Only
� Contractors may take credit for DBEs utdized on this Contract only if the firm is certified
for the Work being performed
� Absent a mandatory goal, all DBE participation that is attained on this pro�ect wdl be
considered as "race neutral" participation and shall be reported as such
�
� City of Bremerton Bremerton Pro�ect No 6187
BVR and LFR Preservahon Pro�ecf lII-29 Sepfember 2013
Contract Documents Drois�on 1
I_ J
�
Cred�ting DBE Participation for Reporteng Purposes
Joint Venture
When a DBE performs as a participant in a �oint venture, only that portion of the total
dollar value of the Contract equal to the distinct, clearly defined portion of the Work
that the DBE perForms with its own forces shall be credited
DBE Prime Contractor
A DBE Prime Contractor may only take credit for that portion of the total dollar value
of the Contract equal to the distinct, clearly defined portion of the Work that the DBE
Prime Contractor performs with its own forces
DBE Subcontractor
When a DBE firm participates as a Subcontractor, only that portion of the total dollar
value of the Contract equal to the distmct, clearly defined portion of the Work that the
DBE performs with its own forces shaii be credited
Include the cost of supplies and materials obtained by the DBE for the Work
in the Contract including supplies purchased or equipment leased by the
DBE However, you may not take cred�t supplies, materials, and equipment
the DBE Subcontractor purchases or leases from the Prime Contractor or its
affiliate In addition, Work pe�Formed by a DBE, util�zing resources of the
Pr�me Contractor or its affiliates shall not be credited
• In very rare situations, a DBE firm may utdize equipment and/or personnel
from a non-DBE firm other than the Prime Contractor or its affiliates Should
this situation arise the arrangement must be short-term and have prior written
approval from the Office of Equal Opportunity (OEO) The arrangement must
not impact a DBE firm's ability to perForm a Commercially Useful Function
- - (CUF) - -- --- - - -
• Count the entire value of fees or commissions charged by a DBE firm for
providing a bona fide service, such as professional, techrncal, consultant,
managerial services, or for providing bonds or msurance
• When a DBE subcontracts to another firm, the value of the subcontracted
Work may be counted as participation only if the DBE's lower tier
Subcontractor is also a DBE
� When non-DBE Subcontractor further subcontracts to a lower-tier
Subcontractor or supplier who is a certified DBE, then that portion of the
Work further subcontracted may be credited as DBE participation, so long as
it is a distinct clearly defined portion of the Work that the DBE is performing
with its own forces
+ If a firm is not certified as a DBE at the time of the execution of the contract,
their participation cannot be counted toward any DBE goals
City of Bremerton Bremerton Pro/ect No 6187
BVR and LFR Preservat�on Pro�ect 1/1-30 September 2013
Contract Documents Diws�on 1
�
��
�
�
���
��
�
�
�
- -�
�
�
�
�
,�
��
�
r
�
�
C�
�
,��
�
�'
�
�
�
�
L_.1
�
�
�
�
�
�
Trucking
Use the followmg factors in determirnng DBE credit and whether a DBE trucking
company is performmg a Commeraally Useful Function (CUF)
1 The DBE must be responsible for the management and superv�sion of the
entire truckmg operation for which credit is bemg claimed
2 The DBE must itself own and, with its own workforce, operate at least one
fully I�censed, msured, and operat�onal truck used on the Contract
3 The DBE receives credit only for the value of the transportation services it
provides on the Contract using trucks it owns or leases, licenses, msures,
and operates with dr�vers it employs For purposes of this requirement a
lease must indicate that the DBE has exclusive use of and control over the
truck This does not preclude the leased truck from working for others
provided it is with the consent of the DBE and the lease provides the DBE
first pnor►ty for use of the leased truck Leased trucks must display the name
and identification number of the DBE
4 The DBE may lease trucks from another DBE firm including an owner-
operator provided they are certified as a DBE for trucking The DBE who
leases trucks from another DBE may claim participation for the total value of
the transportation services the lessee DBE provides on the Contract
5 The DBE may also lease trucks from a non-DBE firm and may enter into an
agreement with an owner-operator who is a non-DBE The DBE shall only
receive credit for the number of additional non-DBE trucks equal or less than
the number of DBE trucks the firms owns or has leased/subcontracted
through another DBE trucking company The DBE must control the work of
the non-DBE trucks If the non-DBE is perForming the Work without
supervision of that Work by the DBE, the DBE is not perFormmg a
Commercially Useful Function (CUF)
6 In any lease or owner-operator situation, as descnbed in requirement #4 and
#5 above, the following rules shall apply
a A wntten lease/rental agreement is required far all trucks leased or
rented, documenting the ownership and the terms of the agreement The
agreements must be submitted and approved by the Contracting Agency
prior to the beginning of the Work The agreement must show the leaser's
name, truck description and agreed upon amount and method of payment
(hour, ton, or per load) Ail lease agreements shali be for a long-term
relationship, rather than for the mdividual proJect (This requirement does
not apply to owner-operator arrangements )
b Only the veh�cle, (not the operator) may be leased or rented (This
requirement does not apply to owner-operator arrangements )
7 Credit may only be claimed for DBE trucking firms operatmg under a
subcontract or a written agreement approved by the Contracting Agency prior
to pertorming Work
C�ty of Bremerton Bremerton Pro�ect No 6187
BVR and LFR Preservahon Pro�ect lll-31 September 2013
Contract Documents D�ws�on 1
�
Expenditures paid to other DBEs
Expenditures paid to other DBEs for materials or supplies may be counted toward DBE
goals as provided in the followmg
Manufacturer
You may claim DBE credit for 100 percent of value of the materials or supplies
obtained from a DBE manufacturer
A manufacturer is a firm that operates or maintains a factory or establishment that
produces, on the premises, the materials, supplies, articies, or equipment required
under the cont�act A manufacturer shall include firms that produce finished goods or
products from raw or unfinished material or that purchases and substantially alters
goods and matenals to make them suitable for construction use before reselling
them
In order to receive credit as a DBE Manufacturer, the firm rnust be certified by
OMWBE as a manufacturer m a NAICS code that falls withm the 31XXXX to 33X�CX
classification
Regular Dealer
You may claim credit for 60 percent of the value of the materials or supplies
purchased from a DBE regular dealer Rules applicable to regular dealer status are
contained in 49 CFR Part 26 55 e 2
To be considered a regular dealer you must meet the followmg criteria
1 WSDOT considers and recognizes a regular dealer, as a firm that owns,
operates, or mamtains a store, warehouse, or other establ�shment m which
the materials or supplies required for the perFormance of the Contract and
descr�bed by the speafications of the Contract are bought, kept �n stock and --
regularly sold or leased to the publ�c in the usual course of business
2 Sixty percent (60%) of the cost of materials or suppiies purchased from an
approved reguiar dealer may be credited as DBE participation
Regular dealer status is granted on a contract-by-contract basis A firm wishing to be
approved as a regular dealer for WSDOT contracted pro�ects or Highways & Local
Program admirnstered pro�ects must submit a request in writing to the OEO no later
than seven days prior to bid opening
Once the OEO has received the request, an onsite review will be set up with the firm
and a review conducted to determine the fi�m's qualifications If it is determined that
the firm quali�es as a regular dealer the OEO will list the firm on an approved regular
dealers List The list may be accessed through the OEO Home website is at
www wsdot wa gov/equalopportunitv
Note Requests to be listed as a regular dealer wdl only be processed if the
requesting firm is certified by the Office of Minority and Women's Business
Enterprises m a NAICS code that fall withm the 42X�CX NAICS Wholesale
code section
C�ry of 8remerton Bremerton Pro�ect No 6187
BVR and LFR Preservat�on Pro/ect !11-32 September 2013
Contract Documents D►v�s�on 1
�
'
�`
�
��
�
,�
L�
`�J
�
�
i
�
L�
�
Materials or Supplies Purchased from a DBE
With regard to materials or suppl�es purchased from a DBE who is neither a
manufa�turer nor a regular dealer you may claim credit for the following
1 Fees or commissions charged for assistance m the procurement of the
materials and supplies
2 Fees or transportation charges for the delivery of materials or supplies
In either case, you may not take credit for any part of the cost of the matenals and
supplies
Joint Checking Allowance
Prime Contractors and DBEs must receive pre-approval by the OEO before using a �oint
check Joint check requests shall be submitted, by the Prime Contractor to the
Contractmg Agency for approval
When requestmg approval for use of a �omt checking allowance, the Contractor must
distribute a wntten �oint check agreement among the parties (including the suppliers
involved) providmg full and prompt disclosure of the expected use of the �oint checks
The agreement shall contain all the information concerrnng the parties' obligations and
consequences or remedies if the agreement is not fulfilled or a breach occurs The �oint
check request shali be submitted to the Contracting Agency for approval prior to signing
the Contract agreement
The followmg are some general conditions that must be met by all parties regarding �oint
check use
a It is understood the Prime Contractor acts as the guarantor of a �oint check
b The DBE's own funds are used to pay supplier of materials The Prime
Contractor does not make direct payment to supplier In order to be performing a
Commercially Usefui Function (CUF), the DBE must release the check to the
supplier (paymg for the materials it-self and not be an extra participant in a
transaction)
c If the Pnme Contractor makes �oint checks avadable to one DBE Subcontractor,
the service must be made available to all Subcontractors (DBE and non-DBE)
d The relationship between the DBE and its suppliers should be established
� independently of and without interference by the Prime Contractor The DBE has
final decision-making responsibdity concerning the procurement of materials and
supplies, includmg which supplier to use
�
�
,
e The Prime Contractor and DBE shall be able to provide receipts, invoices,
cancelled checks and/or certification statements of payment if requested by the
Contracting Agency
f The DBE remains responsible for all other elements of 49 CFR 11 26 55(c) (1)
City of Bremerton Bremerton Pro�ect No 6187
BVR and LFR Preservatron Pro�ect lll-33 September 2013
Contract Documents Drwsion 1
��
Failure by the Prime Contractor to request and to recewe prior approval of a �oint check
arrangement wdl result m the �omt check amount not countmg towards the Prime
Contractor's DBE goal
Commercially Usefui Function (CUF'
In any case, you may only take credit when the associated DBE that is determined to be
perForming a Commercially Useful Function (CUF)
� A DBE performs a CUF when it is responsible for execution of a distinct element
of Work and is carrymg out its responsibilities by performmg, managmg and
supervismg the Work mvolved The DBE must also be responsible with respect to
materials and supplies used on the Contract For example, negotiating price,
determirnng quality, determin�ng quantities, ordering, installmg (if applicable) and
paymg for the matenal itself
• A DBE does not perform a CUF if its role is limited to that of an extra participant
in a transaction, Contract, or pro�ect through which funds are passed
Procedures Between Award and Execution
After award and pnor to Execution of the Contract, the successful Bidder shall provide
additional information as described below Failure to comply may result in the forFeiture
of the Bidder's Proposa( bond or deposit
A list of all firms who submitted a Bid or quote in an attempt to participate in this pro�ect
whether they were successful or not
Include the correct business name, federal employer identification number (optional) and
a mading address
The firms identified by the Prime Contractor may be contacted by Contracting Agency to
solicit general information as foliows
1 Age of the �rm
2 Average of its gross annual receipts over the past three years
Procedures after Execution
Reportmg
Quarterly Report of Amounts Cred�ted as DBE Partic�pation
Form #422-102
The Prime Contractor shall submit a Quarterly Report of Amounts Credited as
DBE Participation form (422-102 EF) on a quarterly basis for any calendar
quarter m which DBE Work is accomplished or upon completion of the pro�ect, as
appropriate This is a record of payments to the DBE that the Prime Contractor is
taking credit for as DBE participation The dollars reported as specified in
Creditmg DBE Participation for Reportmg Purposes section of this contract
provision
Ciry of Bremerton
BVR and LFR Preservatron Pro�ect
Contract Documents
ll!-34
Bremerton Pro�ect No 6187 '
September 2013
D►ws►on 1
�
�
�
�'
In the event that the payments to a DBE have been made by an entity other than
the Prime Contractor (as in the case of a lower-tier Subcontractor or supplier),
then the Pnme Contractor shall obtain the quarterly report, mcluding the signed
affidavit, from the paymg entity and submit the report to the Contractmg Agency
Payment
� Compensation for all costs associated with complying w�th the conditions of this
specification shall be included in payment for the associated Contract items of Work
� Prompt Payment
' Prompt payment to all Subcontractors shall be in accordance with
Section 1-08 1(1) of the Contract Provisions
��
,�
�
�
�
��
�
Damages for Noncompliance
The Prime Contractor shall not discriminate on the basis of race, color, national
origm, or sex in the performance of this Contract The Pr�me Contractor shall carry
out applicable requirements of 49 CFR Part 26 m the award and administration of
Contracts, which contain funding assistance from the Urnted States Department of
Transportation Failure by the Prime Contractor to carry out these requirements is a
material breach of this Contract, which may result in the termination of this Contract
or such other remedy as the Contracting Agency deems appropriate
(July 1, 2013 WSDOT GSP, Opt�on 6)
Smal/ Bus�ness Enterpr�se Parf�c�pat�on
The Small Business Enterprise (SBE) Program is an element of the Disadvantaged
Business Enterprise (DBE) Program m accordance with the requirements of 49 CFR Part
26 39 As such, the requirements of this contract establish affirmative efforts to utdize SBE
certified firms on construction pro�ects No preference wdl be included in the evaluation of
Bids/Proposals No mmimum level of SBE participation shall be required as a Condition of
Award and Bids/Proposals may not be re�ected or considered non responsive on that basis
Voluntary SBE Goals
A voluntary goal amount of ten percent of the Contract bid amount is established
� The goal is voluntary, but achievement of the goal is encouraged No preference wdl be
included in the evaluation of bids/proposals Bidders may contact the
Washington State Office of Minority and Women's Business Enterprises (OMWBE)
� at 360-664-9750 or visit www omwbe wa gov to obtain information on certified SBE
firms
�
�
�
Required SBE Part�cipation Plan
The Contractor shall submit a SBE Participation Plan prior to commencing contract work
Although the goal is voluntary, the outreach efforts to provide SBE maximum practicable
opportunities are not
For SBE Participation Plan Drafting Guidelines, please visit
www wsdot wa gov/equalopportunity
' C�fy of Biemerton
BVR and LFR Prese►vation Pro�ect
Contracf Documents
lll-35
Bremerton Pro/ect No 6187
September 2013
D�vrs�on 1
�
�
Defenitions
Regardless of race or gender, a SBE is one certified by OMWBE as such, where the
firm's
• Three year averaged gross receipts are less than $22 41 million dollars, with
smalter mdustry standards applicable
• Is at least 51 % owned and controlled by an individual or individuals with a
personal net worth less than $1 32 mdlion dollars
• A Micro Small Business Enterprise is a firm certified as an SBE with 40 average
gross receipts for three years less than one million dollars
1-07 12 Federal Agency Inspectoon
Section 1-07 12 is supplemented with the following
(July 30, 2012 WSDOT GSP, Opf�on 1)
Requ►red Federa! A�d Provisions
The Required Contract Provisions Federal Aid Construction Contracts (FHWA 1273)
Revised May 1, 2012 supersede any conflictmg provisions of the Standard Speafications
and are made a part of this Contract, provided, however, that if any of the provisions of
FHWA 1273 are less restrictive than Washmgton State Law, then the Washmgton State Law
shall prevad
The provisions of FHWA 1273 included in this Contract require that the Contra�tor insert the
FHWA 1273 in each Subcontract, together with the wage rates which are part of the FHWA
1273 Also, a clause shall be included in each Subcontract requiring the Subcontractors to
--- insert the FHWA 1273-thereto in any lower tier Subcontracts, together with the wage rates
The Contractor shall also ensure that this section, REQUIRED FEDERAL AID
PROVISIONS, is inserted in each Subcontract for Subcontractors and lower tier
Subcontractors For this purpose, upon request to the Pro�ect Engineer, the Contractor will
be provided with extra copies of the FHWA 1273, the applicable wage rates, and this
Special Provision
1-0713 Contractor's Responsibil�ty for Work
1-0713(4) Repair of Damage
Section 1-07 13(4) is revised to read
(August 6, 2001 WSDQT GSP)
The Contractor shall promptly repair all damage to either temporary or permanent work as
directed by the Engmeer For damage qualifying for relief under Sections 1-0713(1),
1-07 13(2) or 1-07 13(3), payment will be made in accordance with Section 1-04 4 Payment
wdl be limited to repair of damaged work only No payment will be made for delay or
disruption of work
C�ty of Bremerton
BVR and LFR Preservatron Pro�ect
Contract Documents
ll/ 36
�
��
�
,�
�
��
�'
��
�
_ �
�
�
�'�
��
�
�
��
Bremerton Pro�ect No 6187 �
September 2013
D�v►s�on 1
�
�
� 1-07 17 Ut�lities and Similar Facilit�es
�
�
��
��
�� �
Section 1-07 17 is supplemented with the following
(Aprd 2, 2007 WSDOT GSP, Opt�on 1)
Locations and dimensions shown in the Plans for existing facditres are in accordance with
availabfe information obtained without uncovenng, measurmg, or other verification
The following addresses and telephone numbers of utility companies known or suspected of
having facdities within the pro�ect limits are supplied for the Contractor's convenience
*** Storm Drainage
City of Bremerton
Contact Gunnar Fridnksson,
3027 Olympus Drive
Bremerton, WA 98310-4799
(360) 473-2354
Water/Sanitary
City of Bremerton
Contact Ned Lever, P E
3027 Olympus Drive
Bremerton, WA 98310
(360) 473-2398
�
�
�
�
�
�
1-07 23
�
1-07 23(1)
��
�
�
Gas
Cascade Natural Gas Co
Contact Mike Dunn
6313 Kitsap Way
Bremerton, WA 98310
(360) 373-1403
Fober Optic Cable
Convergence Technologies
Contact John Stockwell
900 Sheridan Road
Bremerton, WA 98310
(360) 405-1231
Public Convenience and Safety
Construction Under Traffic
Power
Puget Sound Energy
Contact Tom Brobst
6522 Kitsap Way
Bremerton, WA 98312
(360) 475-7020
Cable
Comcast
Contact Jim LeCompte
1225 Sylvan Way
Bremerton, WA 98310
(360) 340-1288
Fiber Optic Cable
Kitsap Co PUD
Contact Matt Hensen
1431 Finn Hill Road
Poulsbo, WA 98370
(360) 509-8925 ***
Section 1-07 23(1) is supplemented with the following
(January 2, 2012 WSDOT GSP, Option 2)
Work Zone Clear Zone
The Work Zone Clear Zone (WZCZ) applies durmg workmg and nonworking hours The
WZCZ applies only to temporary roadside obJects introduced by the Contractor's operations
and does not apply to preexisting conditions or permanent Work Those work operations
that are actively in progress shall be in accordance with adopted and approved Traffic
Control Plans, and other contract requirements
� C�ty of Br�merton
BVR and LFR Preservabon Pro�ect
Contract Documents
Telephone
Qwest
P E Contact Dan O'Toole
611 6th Street
Bremerton, WA 98337
(360) 478-5930
lll-37
Bremerton Pro�ect No 6187
September 2013
Div►s�on 1
�
Durmg nonworking hours equipment or materials shall not be withm the WZCZ unless they
are protected by permanent guardrad or temporary concrete barrier The use of temporary
concrete barner shall be permitted only if the Engineer approves the installation and
location
During actual hours of work, uniess protected as described above, only materials absolutely
necessary to construction shall be withm the WZCZ and only construction vehicles
absolutety necessary to construction shall be ailowed within the WZCZ or allowed to stop or
park on the shoulder of the roadway
The Contractor's nonessential vehicfes and employees private vehicles shall not be
permitted to park withm the WZCZ at any time unless protected as described above
Deviation from the above requirements shall not occur unless the Contractor has requested
the deviation m writing and the Engmeer has provided written approval
Minimum WZCZ distances are measured from the edge of traveled way and will be
determined as follows
Regulatory Distance From
Posted Speed Traveled Way
Feet
35 m h or less 10 *
40 m h 15
45 to 55 m h 20
60 mph or 30
reater
1-08
" or 2-feet beyond the outside edge of sidewalk
_ _ Minimum Work Zone Clear Zone Distance __ _
PROSECUTION AND PROGRESS
Add the following new section
1-08 0 Prelimmary Matters
(May 25, 2006 APWA GSP)
Add the followmg new section
New Sect�on
1-08 0(1) Preconstruct�on Conference New Section
(October 90, 2008 APWA GSP)
Prior to the Contractor beginrnng the work, a preconstruction conference will be held
between the Contractor, the Engmeer and such other interested parties as may be mvited
The purpose of the preconstruction conference wiil be
1 To review the initial progress schedule,
2 To establish a working understandmg among the various parties associated or
affected by the work,
C�ty of Bremerton B�emerton Pro�ect No 6187
BVR and LFR Preservahon Pro/ect lll-38 September 2013
Contract Documents D�v�s�on 1
��
�
�
��
�
�
�
�
�
�
�
�
��
�'
��
��
J
��
�
�
LJ
�
3 To establish and review procedures for progress payment, notifications, approvals,
submittals, etc ,
4 To estabiish normal working hours for the work,
5 To review safety standards and tra�c control, and
6 To discuss such other related items as may be pertinent to the work
The Contractor shall prepare and submit at the preconstruction conference the followmg
1 A breakdown of all lump sum items,
2 A preliminary schedule of working drawing submittals, if applicable, and
3 A list of material sources for approval, if applicable
Add the followmg new section
1-08 0(2) Hours of Work New Section
(March 8, 2013 APWA GSP)
Except in the case of emergency or unless otherwise approved by the Contractmg Agency,
the normal straight time workmg hours for the Contract shall be any consecutive 8-hour
period between 7 00 a m and 6 00 p m of a workmg day with a maximum 1-hour lunch
break and a 5-day work week The normal straight time 8-hour working period for the
Contract shali be established at the preconstruction conference or prior to the Contractor
commencmg the work
Wntten permission from the Engineer is required, if a Contractor desires to perform work on
holidays, Saturdays, or Sundays, before 7 00 a m or after 6 00 p m on any day, or longer
than an 8-hour penod on any day The Contractor shall apply in writing to the Engineer for
such permission, no later than noon on the working day prior to the day for which the
Contractor is requestmg permission to work
Permission to work befinreen the hours of 10 00 p m and 7 00 a m during weekdays and
between the hours of 10 00 p m and 9 00 a m on weekends or holidays may also be
sub�ect to noise controi requirements Approval to continue work during these hours may be
revoked at any time the Contractor exceeds the Contracting Agency's noise control
regulations or complaints are received from the public or ad�oining property owners
regarding the noise from the Contractor's operations The Contractor shall have no claim for
damages or delays should such permission be revoked for these reasons
Permission to work Saturdays, Sundays, holidays, or other than the agreed upon normal
� straight time working hours Monday through Fnday may be given sub�ect to certain other
conditions set forth by the Contracting Agency or Engineer These conditions may include
but are not limited to
�j
�
• The Engmeer may require designated representatives to be present during the work
Representatives who may be deemed necessary by the Eng�neer mclude, but are
not limited to survey crews, personnel from the Contracting Agency's material
testmg lab, inspectors, and other Contraeting Agency employees when in the opirnon
of the Engineer, such work necessitates their presence
• On non-Federal aid pro�ects, requiring the Contractor to reimburse the Contracting
� Agency for the costs in excess of straight-time costs for Contracting Agency
representatives who worked during such times
' City of Bremerton Bremerton Pm/ect No 6187
BVR and LFR Proservabon Pro�ect IIl-39 September 2013
Contract Documents Drv►s�on 1
�
• Considermg the work performed on Saturdays, Sundays, and holidays as working
days with regard to the contract time
• Considering multiple work shifts as multiple working days with respect to contract
time, even though the multiple shifts occur in a single 24-hour per�od
1-081 Subcontractmg
Section 1-08 1 is suppiemented with the following
(October 12, 1998 WSDOT GSP, Option 1)
Prior to any subcontractor or lower tier subcontractor beginn�ng work, the Contractor shall
submit to the Engineer a certification (WSDOT Form 420-004 EF) that a written agreement
between the Contractor and the subcontractor or between the subcontractor and any lower
tier subcontractor has been executed This certification shail also guarantee that these
subcontract agreements include all the documents required by the Special Provision
Federal Agency Inspection
A Subcontractor or lower tier Subcontractor will not be permitted to perform any work under
the contract until the fo�lowing documents have been completed and subm�tted to the
Engineer
1 Request to Sublet Work (Form 421-012 EF), and
2 Contractor and Subcontractor or Lower Tier Subcontractor Certification for Federal-
aid Pro�ects (Form 420-004 EF)
The Contractor's records pertaining to the requirements of this Special Provision shall be
open to inspection or audit by representatives of the Contracting Agency durmg the life of
the contract and for a period of not less than three years after the date of acceptance of the
contract The Contractor shall retam these records for that period The Contractor shall also
guarantee that these records of all Subcontractors and lower tier Subcontractors shall be
available and open to s�milar mspection or audit for the same time period
1-08 1(1) Subcontract Completion and Return of Reta�nage Withheld
Section 1-081(1) is revised to read
(June 27, 2011 WSDOT GSP, Opt�on 1)
The following procedures shall apply to all subcontrac#s entered into as a part of this
Contract
Requirements
1 The Prime Contractor or Subcontractor shall make payment to the Subcontractor not
later than ten (10) days after receipt of payment frorn the Contracting Agency for work
satisfactorily completed by the Subcontractor, to the extent of each Subcontractor's
interest therem
2 Prompt and full payment of retainage from the Prime Contractor to the Subcontractor
shall be made within 30 days after Subcontractor's Work is satisfactorily completed
City of Bremerton Bremerton Profect No 6187
BVR and LFR Preservat►on Pro�ect lll-40 September 2013
Contrect Documents Divis�on 1
�
�
�
�
,�,
t__1
�
�
��
�'
�
�
�
�J
�'
�
�
3 For purposes of this Section, a Subcontractor's work �s satisfactordy completed when all
task and requirements of the Subcontract have been accomplished and including any
required documentation and material testmg
4 Fadure by a Prime Contractor or Subcontractor to comply with these requirements may
result in one or more of the followmg
a Withholding of payments untd the Prime Contractor or Subcontractor complies
b Failure to comply shall be refiected in the Prime Contractor's Performance
Evaluation
c Cancellation, Termination, or Suspension of the Contract, in whole or in part
d Other sanctions as provided by the subcontractor or by law under applicable prompt
pay statutes
Cond�t�ons
This clause does not create a contractual relationship between the Contractmg Agency and
any Subcontractor as stated in Section 1-08 1 Also, it is not mtended to bestow upon any
Subcontractor, the status of a third-party beneficiary to the Contract between the
Contracting Agency and the Contractor
Payment
The Contractor w�ll be solely responsible for any additional costs involved in paymg
retainage to the Subcontractors Those costs shall be madental ta the respective Bid Items
1-08 4 Prosecut�on of Work
Delete this section in its entirety, and replace it with the following
1-08 4 Notice to Proceed and Prosecution of Work
(June 27, 2011 APWA GSP)
Notice to Proceed wdl be given after the contract has been executed and the contract bond
and evidence of insurance have been approved and filed by the Contracting Agency The
Contractor shall not commence with the work untd the Notice to Proceed has been given by
the Engineer The Contractor shall commence construction activities on the pro�ect site
within ten days of the Notice to Proceed Date, unless otherwise approved m writmg The
Contractor shall ddigentiy pursue the work to the physical completion date within the time
specified in the contract Voluntary shutdown or slowing of operations by the Contractor
shall not relieve the Contractor of the responsibdity to complete the work within the time(s)
specified m the contract
When shown m the Plans, the first order of work shall be the installation of high wsibdity
fencmg to delineate all areas for protection or restoration, as described in the Contract
Installation of high visibility fencing ad�acent to the roadway shall occur after the placement
of all necessary signs and traffic control devices in accordance with 1-101(2) Upon
construct�on of the fencing, the Contractor shall request the Engineer to inspect the fence
No other work shall be performed on the site until the Contracting Agency has accepted the
instaltation of high visibdity fencing, as described in the Contract
� C�ty of Bremerton
BVR and LFR Pr�servat�on Pro/ect
Contract Documents
lll-41
Bremerton Pro�ect No 6187
September 2013
D�v�s�on 1
�
1-08 5 Time for Completion
Section 1-08 5 is supplemented with the following
(March 13, 1995 WSDOT GSP, Opt�on 7)
This pro�ect shall be physically completed within ***30*** working days
1-08 9 L�qu�dated Damages
(August 94, 2093 APWA GSP)
Revise the fourth paragraph to read
When the Contract Work has progressed to Substantial Completion as defined in the
Contract, the Engineer may determine that the work is Substantially Complete The
Engineer wdl notify the Contractor in writmg of the Substantial Completion Date For
overruns in Contract time occurnng after the date so established, the formula for liquidated
damages shown above wdi not apply For overruns m Contract time occurring after the
Substantial Completion Date, liquidated damages shall be assessed on the basis of direct
engineering and related costs assignable to the pro�ect until the actual Physical Completion
Date of all the Contract Work The Contractor shall complete the remaining Work as
promptly as possible Upon request by the Pro�ect Engineer, the Contractor shall furnish a
written schedule for completing the physical Work on the Contract
1-09 MEASUREMENT AND PAYMENT
Add the followmg new section
1-09 9(1) Reta�nage
__ Section 1-09 9(1) content and_title is deleted and replaced with the following
(June 27, 2019 WSDOT GSP)
Vacant
1-10
1-10 2
1-10 2(1)
TEMPORARY TRAFFIC CONTROL
Traff�c Control Management
General
Section 1-10 2(1) is supplemented with the following
- - - - -�
(December 1, 2008 WSDOT GSP, Option 1)
Only training with WSDOT TCS card and WSDOT trainmg curriculum is recognized m the
State of Washmgton The Traffic Control Supervisor shall be certified by one of the following
The Northwest Laborers-Employers Training Trust
27055 Ohio Ave
Kingston, WA 98346
(360) 297-3035
C�ty of Bremerton
BVR and LFR Preservation Pro�ect
Contract Documents
lll-42
�.J
�
�
u
��
,�
Bremerton Pro�ect No 6187 �
September 2013
Drvrsion 1
��
�
�
�
�
�
�
��
�
��
�'
�
�
�
�
�
�
�
�
Evergreen Safety Council
401 Pontius Ave N
Seattle, WA 98109
1-800-521-0778 or
(206) 382-4090
The American Traffic Safety Services Association
15 Riverside Parkway, Suite 100
Fredericksburg, Virginia 22406-1022
Trairnng Dept Toll Free (877) 642-4637
Phone (540) 368-1701
1-10 4 Measurement
1-10 4(1) Lump Sum Bid for Pro�ect (No Unit Items)
Section 1-10 4(1) is supplemented with the following
(August 2, 2004 WSDOT GSP)
The proposai contains the item "Pro�ect Temporary Traffic Control," lump sum The
provisions of Section 1-10 4(1) shall apply
END OF DIVISION 1
C�ty of Bremerton
BVR and LFR Preservabon Pro�ect
Contract Documenfs
!11-43
Bremerton Pro/ect No 6187
September 2013
D�wsron 1
,
I
�
�
�
5-04
� 5-04 3
�
5-04 3(5)
DIVISION 5
SURFACE TREATMENTS AND PAVEMENTS
HOT MIX ASPHALT
Construction Requirements
Conditson�ng of Existing Surface
5-04 3(5)E Pavement Repair
�
The second paragraph of Section 5-04 3(5)E is revised to read as follows
The minimum depth of pavement repair excavation shall be 12 inches This will allow for
� 8 mches of CSTC and 4 inches of HMA Class 1/2 inch Any excavation below 12 inches wdl
, be paid as unsuitable foundation excavation includrng haul
�
�
�
�
�
�
�
�
�
�
The minimum and maximum width of any pavement repair shail be determmed in the field by
the Engineer Before any excavation, the existing pavement shall be saw cut or shall be
removed by a pavement grinder Placement of HMA shall be in two separate 2-inch
compacted lifts
Section 5-04 3(5)E is supplemented with the following
As directed by the Engineer, areas of asphalt concrete pavement disturbed by the
Contractor's operations shall be repaired as shown m the Plans to the limits determined by
the Engineer
The placing and compaction of the trench backfill, and the preparation and compaction of
the subgrade shall be in accordance with the requirements of the various applicable
sections of the Standard Specifications, Specia! Prov�sions, and the detail in the Plans
Before the patch is constructed, all pavement cuts shall be trued so that the margmal lines
of the patch will form a rectangle with reasonably straight edges and vertical faces After the
subgrade has been prepared, Hot Mix Asphalt shall be placed to a thickness as shown in
the Plans or as directed by the Engmeer The edges of the existing asphalt pavement and
castings shall be pamted with hot asphalt cement or asphalt emulsion immediately before
placmg the asphalt patching material The asphalt shall then be placed, leveled, and
compacted to conform to all the ad�acent paved surfaces Immediately thereafter, all �oints
between the new and original asphalt pavement shall be painted with hot asphalt or asphalt
emulsion and be covered with dry paving sand before the asphait solidifies The material for
tacking the bottom and sides of patches for asphalt concrete shall be CRS 2 catiornc
emulsified asphalt per Section 9-02 1(6) of the Standard Speci�cations For seaimg the
edges after placmg the asphalt concrete patch, the Contractor shall use a light cutback,
AR4000 cunng liquid asphalt, and then sand the surFace to prevent tracking
� C►ty of Bremerton
BVR and LFR Preservat�on Pro/ect
Contract Documents
lll-45
Bremerton Pro�ect No 6187
September 2013
D►ws►on 5
�
5-04 3(7) Preparat�on of Aggregates
5-04 3(7)A Mix Design
Delete this section and replace it with the following
1 Generai Prior to the production of HMA, the Contractor shall determine a design
aggregate structure and asphalt binder content m accordance with WSDOT Standard
Operating Procedure 732 Once the design aggregate structure and asphalt binder
content have been determined, the Contractor shall submit the HMA mix design on DOT
form 350-042 demonstrating the des�gn meets the requirements of Sections 9-03 8(2)
and 9-03 8(6) HMA accepted by nonstatistical evaluation requires a m�x design
verification For HMA accepted by commercial evaluation only the first page of DOT form
350-042 and the percent of asphalt binder is required In no case shali the paving begin
before the determination of anti-strip requirements has been made Anti-strip
requirements will be determined by
a Testmg by WSDOT m accordance with TM 718
b Testing by Contractor in accordance with WSDOT TM 718
c Historical aggregate source ant-strip use provided by WSDOT
The mix design will be the initial Job Mix Formula (JMF) for the HMA being produced
Any additional ad�ustments to the JMF will require the approval of the Pro�ect Engineer
and may be made per Section 9-03 8(7)
2 M�x Design Verification Verificatron shall be accomplished by one of the following
processes
a The contracting agency will perform tests to verify the mix design in accordance
with the Field VerrFication Testing Process
b Reference a mix design that has been previously verified by the Field Venfication
Testing Process or ver�fied by WSDOT State Materials Lab on a previous pro�ect
c PerForm Field Verification Testmg on a sample of HMA provided by the
Contra�tor prior to paving
Mix design verification is valid for one year from the date of verification At the discretion of
the Engineer, agencies may accept mix designs verified beyond the verification year with
certification from the Contractor that the matenals and sources are the same as those
shown on the original mix design
3 F�eld Ver�f�cat�on Testing Process The Contracting agency wili collect three
Production Samples of HMA on the first day of paving per AASHTO T 168 sampling
procedures
a The Contractmg agency will test one Production Sample in accordance with
section 5-04 3(8)A for �eld verification per the requirements of Section 9-03 8(7)
C►ry of Bremerton Bremerton Pro�ect No 6187
BVR and LFR Presenrabon Pro/ect lll-46 September 2013
Contract Documents D�ws�on 5
I I�
b If the test results from the first Production Sample are within the tolerances of
section 9-03 8(7), the mix design will be considered verified and the test results
wiil be used as acceptance sample number one
c If the test results from the first Production Sample are outside the tolerances of
section 9-03 8(7), the other two samples wdl be tested and the results of all three
tests will be used for acceptance in accordance with Section 5-04 5(1) and will be
used �n the caiculation of the CPF the maximum CPF shail be 1 00
�'�
i ��
i j �'
� ��
4 Prior to the first day of paving, six Igrntion Furnace Calibration Samples shall be
obtained to calibrate the Igrntion Furnaces used for acceptance testing of the HMA
Calibration samples shall be provided by the Contractor when directed by the Engineer
Calibration sampies shall be prepared in accordance with WSDOT SOP 728
5 Design and Performance — Asphalt F�ber Additive
a The design of the pavement shall be in accordance with the 1993 American
Association of State Highway and Transportation Officials (AASHTO) Gu�de for
Design of Pavement Structures or the Mechanistic-Empirical Pavement Design
Guide (MEPDG)
A
b The des�gn of the pavement shall be based on the followmg parameters
1 AASHTO The Fiber Enhanced A C Layer Coefficient = 0 53
(min )
2 MEPDG Average Modular Value = 1 44
c Enhanced A C layer coe�cients and modular value shall be calibrated and
validated with the results of full scale laboratory, field and/or accelerated
pavement testing where actual remforced A C sections are tested against control
unreinforced A C sections Testmg of the fiber enhanced A C material must be
done at a certified DOT, University, or other credible testing facility in the Urnted
States Test results and contacts of those involved in the testing must be
provided with the submittal described below
i�!�
r -
I (�
��
�
B
d Any submittai for an alternative fiber additive must be submitted at least 2 weeks
m advance of the bid date and must be accompanied with the followmg
1 A design signed and sealed by a professional eng�neer registered to
practice in the country, state or province in which the pro�ect is
located
2 A written statement from the alternat�ve pavement design engineer-of-
record that the design is based on the AASHTO 1993 Pavement
Design Guide and utdizes an enhanced A C layer coefficient that has
been properly calibrated and validated for the reinforcement of
reinforcement of A C pavement in accordance with this Section
3 Reports and study results from cal�bration and validation tests along
with contacts of those involved m testing
4 A list of at least 3 pro�ects with pro�ect contacts that have used the
fiber additive m a similar A C pavement application
C�ty of Bremerton
BVR and LFR Presenration Pro�ect
Confract Documents
!11-47
Bremerton Pro�ect No 6187
September 2013
D�visron 5
� I�
��
i
Paving of asphalt concrete driveways shall be completed as to mm�mize disruption of `' 1'
access to the associated property
5-04 4 Measurement
Section 5-04 4 is supplemented with the following
Pavement repair includes work not specifically identified on the Plans Pavement repair wiil
be specif�caliy marked in the field by the City The quantity in the bid item for "Pavement
Repair" is an estimated quantity The Contractor shall be paid for only the actual amount of
pavement repair required by the Engmeer Section 1-04 4 shall not apply Pavement repair
shall be accordmg to Bremerton Standard Drawing 3155
5-04 5 Payment
Section 5-04 5 is supplemented with the following
"Fiber Reinforced HMA CL 1/2 In PG 64-22", perton
"Pavement Repair", per square yard
The urnt contract price per square yard for "Pavement Repair" shall be full pay for
performing the work as specified, mcluding, but not limited to, all costs for saw cutting,
excavation to a depth of 12 inches, hauling and disposal of mater�als, furrnshmg, placing,
and compacting HMA Class 1/2 PG 64-22 Payment for installation of crushed surfacing top
course shall be paid under that bid item
END OF DiVISION 5
(�1 �
�
jr
� �_�
� 4
I
�4
��
�LJ
Ig
� ��
L�
1
If;�
City of Bremerton
BVR and LFR Preservahon Pro�ect
Contract Documents
lll-52
!1
Bremerton Pro�ect No 6187 � I
Septembe� 2013 -�
Drvis�on 5
�`�
LJ
�
�
�
�J
�
�
�
�
,�
CJ
�
�
�
�
�J
lJ
�
(August 5, 2013)
STANDARD PLANS
The State of Washington Standard Plans for Road, Bridge and Murncipal Construction M21-01
transmitted under Publications Transmittal No PT 13-037, effective August 5, 2013 is made a
part of this contract
The Standard Plans are revised as follows
A-50 10
Sheet 2 of 2, Plan, with Smgle Slope Barrier, reference C-14a is revised to C-70 10
A-50 20
Sheet 2 of 2, Plan, with Anchored Barrier, reference C-14a is revised to C-70 10
A-50 30
Sheet 2 of 2, Plan (top), refe�ence C-14a is revised to C-70 10
B-10 20 and B-10 40
Substitute "step" in lieu of "handhold" on plan
B-25 20
Add Note 7 See Standard Specification Section 8-04 for Curb and Gutter requirements
B-90 40
Offset & Bend details, add the subtitle, "Plan View" above titles
C-16a
Note 1, reference C-28 40 is revised to C-20 10
C-16b
Note 3, reference C-28 40 is revised to C-20 10
C-70 10-00
Elevation, and Barrier Connec#ion Detail, cal►out for premolded �oint filler, revise 1/4" to 3/8"
Note 1, revise 1/4" to 3/8"
The Welded Wire Reinforcing Substitution Option Table is deleted The note, "*Optional
Substitutions to Welded Wire Reinforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Reinforcement Deformed,
for Concrete may be substituted for reinforcing steel in accordance with Standard
Specification 6-10 3 "
C-75 10-00
Elevation, callout for premolded �oint fdler, revise 1/4" to 3/8", Note 1, revise 1/4" to 3/8"
The Welded Wire Reinforcing Substitution Option Table is deleted The note, "*Optional
Substitutions to Welded Wire Reinforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Reinforcement Deformed,
for Concrete may be substituted for reinforcing steel m accordance with Standard
Specification 6-10 3 "
� City of Breme►ton
BVR and LFR Preservatron Pro/ect
Contract Documents
I!I-53
Bremerton Pro�ect No 6187
September 2013
Standard Plans
�
C-75 20-00
Elevation, callout for premolded �oint filler, revise 1/4" to 3/8", Note 1, revise 1/4" to 3/8"
The Weided Wire Reinforcing Substitution Option Table is deleted The note, "*Optional
Substitutions to Welded Wire Remforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Reinforcement Deformed,
for Concrete may be substituted for reinforcmg steel in accordance with Standard
Specification 6-10 3 "
C-75 30-00
Elevation, and Plan views, callout for premolded �oint fdler, revise 1/4" to 3/8" ", Note 1,
revise 1 /4" to 3/8"
The Welded Wire Reinforcing Substitution Option Table is deleted The note, "'`Optional
Substitutions to Welded Wire Reinforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is rev�sed to read "Steel Welded Wire Reinforcement Deformed,
for Concrete may be substituted for reinforcing steel in accordance with Standard
Specification 6-10 3 "
C-80 10-00
The Welded Wire Reinforcing Substitution Option Table is deleted The note, ""Optional
Substitutions to Welded Wire Reinforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Reinforcement Deformed,
for Concrete may be substituted for reinforcing steel in accordance with Standard
Specification 6-10 3 "
C-80 20-00
The Welded Wire Re�nforang Substitution Optian Table is deleted The note, ""�ptional
Substitutions to Welded Wire Reinforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Remforcement Deformed,
for Concrete may be substituted for reinforcing steel m accordance with Standard
Specification 6-10 3 "
C-80 30-00
The Welded Wire Re�nforcing Substitution Option Table is deleted The note, "*Optional
Substitutions to Welded Wire Reinforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Remforcement Deformed,
for Concrete may be substituted for reinforcing steel in accordance with Standard
Specification 6-10 3 "
C-80 40-00
The Welded Wire Reinforcmg Substitution Option Table is deleted The note, "*Optional
Substitutions to Welded Wire Reinforcements shall conform to Standard Specification
Sections 6-10 and 9-07" is revised to read "Steel Welded Wire Reinforcement Deformed,
for Concrete may be substituted for reinforcing steel in accordance with Standard
Specification 6-10 3 "
C-85 14
General Notes, Note 1, reference to Standard Plan C-13 �s revised to C-70 10
C-85 15
General Notes, Note 2, reference to Standard Plan C-13 is revised to C-70 10
C►ty of Bremerton Bremerton Pro�ect No 6187
BVR and LFR Preservation Pm�ect lll-54 September 2013
Contract Documents Standard Plans
�
�
�
�J
��
�
�
�
C-85 16
General Notes, Note 1, reference to Standard Plan C-13 is revised to C-70 10
C-85 18
General Notes, Note 1, reference to Standard Pian C-13 is revised to C-70 10
C-85 20
General Notes, Note 3, reference to Standard Plan C-13 is revised to C-70 10
D-3 10
Key Note 7, reference to 1130 04(5) 06 is revised to 730 05(5)
F-10 12
Note 1 See Standard Plan F-30 10 for Curb Expansion and Contraction Joint spacing !s
revised to read, "See Standard Plan F-30 10 for Curb Expansion and Contraction Joint
spacing and see Standard Specif�cation section 8-Q4 and 9-04 for additional requirements "
F-10 62
Pian Title, Precast Concrete Sloped Mountable Curb is revised to read, "Precast Sloped
Mountable Curb"
F-10 64
� Plan Title, Plan Title, Precast Concrete Dual Faced Sloped Mountable Curb is revised to
read, "Precast Dual Faced Sloped Mountable Curb°
�
F-30 10
Sections, left side of sheet, (4 places), dimension, Sidewalk - 6' — 0" MIN (See Contract) is
revised to read, "Sidewalk (See Contract)"
� Section, top middle of sheet, dimension, Sidewalk — 6' — 0" MIN (See Contract) is revised
to read, "Sidewalk (See Contract)"
�
C.�
�
�
�
�
�
F-80 10
callout, top middle of sheet, Match Sidewalk Width See Contract Plans � 4' — 0" MIN is
revised to read, "Match S�dewalk Width See Contract Plans"
dimension, PLAN VIEW TYPE 2, (2 places), 4' — 0" MIN, �s revised to read, "(See
Contract)"
dimension, SECTION C, See Contract Plans � 4' — 0" MIN is revised to read, "See
Contract Plans"
G-60 20
Side View, caliout, "Anchor Rod � 1-3/4" Diam x 4'-4" Threaded 8" Mm Each End, W/ 2
Washers & 4 Heavy Hex Nuts � Galvanize Exposed Anchor Rod End for 1'-0" Min " is
revised to read, "Anchor Rod � 1-3/4" Diam x 4'-4" Threaded 8" Min Each End, W/ 2
Washers & 6 Heavy Hex Nuts � Galvanize Exposed Anchor Rod End for 1'-0" Min "
G-60 30
End View, callout, "Anchor Rod � 1-3/4° Diam x 4'-4" Threaded 8" Min Each End, W/ 2
Washers & 4 Heavy Hex Nuts � Galvanize Exposed Anchor Rod End for 1'-0" Min " is
revised to read, "Anchor Rod � 1-3/4" Diam x 4'-4" Threaded 8" Min Each End, W/ 2
Washers & 6 Heavy Hex Nuts � Galvan�ze Exposed Anchor Rod End for 1'-0" Min "
C�ty of Bremerton Bremerton Pro�ect No 6187
BVR and LFR Presenrat�on Pro�ect lll-55 September 2013
Contract Documents Standard Plans
�
H-70 20
Sheet 2, Spacing Detail, Madbox Support Type 1, reference to Standard Plan I-70 10 is
revised to H-70 10
I-50 10
Deleted
J-3b
Sheet 2 of 2, Plan View of Service Cabinet, Boxed Note, "SEE STANDARD PLAN J-6C °
is revised to read "SEE STANDARD PLAN J-10 10 "
Sheet 2 of 2, Plan View of Service Cabmet Notes, references to Std Plan J-9a are revised
to J-60 05 (3 instances)
J-10 10
Note 2 The contractor shall install the conduits in the locations shown Conduits shall
extend 2" min above the couplmg The conduit contairnng unfused utility conductors shall
extend into the utility chase is revised to read
"The contractor shall mstall the conduits in the locations shown Conduits shall extend 2"
min above the coupling The grounded end bushing on GRS conduit and the end bell
bush�ng on PVC conduit shall extend 3" max above the coupimg The conduit conta�rnng
unfused utdity conductors shall extend into the utdity chase "
Note 4 The cabinets shall be attached to the foundation with 4 each 1/2" X 12" x 2" x 4"
hot dip galv anchor bolts, washers, and nuts Stamless steel epoxy anchors may be
used as an alternative, and shall be 1/2" diam X 9", or 5/8" diam x 8" Bolts shall
extend 1 1/2" min to 2" max above the concrete pad is revised to read
"The cabinets shall be attached to the foundation with 4 each 1!2" x 12" x 2" x 4" anchor
bolts, washers, and nuts conforming to Section 9-06 5(1) and galvarnzed after fabrication in
accordance with AASHTO M 232 Stainless steel epoxy anchors may be used as an
alternative, and shall be 1/2" diameter x 9", or 5/8" diameter x 8" Threaded Rod
(conforming to ASTM F 593), washers (conforming to ASTM A 240), and nuts (conforming
to ASTM F 594), all shall be Type 304 stamless steel Bolts shall extend 1 1/2" min to 2"
max above the concrete pad "
J-10 15
ANCHOR BOLT detail, callout — ASTM A307 with washer and nut — Galvanized per
AASHTO M 232 is revised to read, "Anchor bolts, washers, and nuts conforming to Section
9-06 5(1) and galvanized after fabrication in accordance with AASHTO M 232 "
J-15 10
Elevation View (3x), Depth dimension, reads, "Depth � See Std Spec 9-20 3(94)E and
Contract", revised to read, "Depth � See Std Spec 8-20 3(13)A and ContracY'
J-15 15
General Notes, Note 3, reference to Standard Plan J-7c is revised to J-27 15
C�ty of Bremerton Bremerton Pro�ect No 6187
BVR and LFR Preservahon Pro�ect ll!-56 September 2013
Contract Documents Standa►d Plans
�
�
�
�
�
J-16b
Deleted
J-16c
Deleted
J-20 10-02
Foundation Detail, callout, "1/2" diameter steel hex nut, with 1 1/2" flat washer (2) each
req'd per anchor bolt" is revised to read, 1/2" diameter steel heavy hex nut, with 1/2" flat
washer (2) each req'd per anchor bolt
J-20 11-01
� Sheet 1, View A, callout, "1/2° x 26" full thread �(4) required 1/2" hex nuts �(4) required
per anchor bolt" is revised to read, "1/2" x 24" full thread �(4) required 1/2" heavy hex nuts
� (4) required per anchor bolY'
�
�
�
C�
.
C�
Section B, callout, "1/2" diameter steel hex nut, with 1/2" flat washer, (2) required per
anchor bolt" is rewsed to read, 1/2° diameter steei heavy hex nut, with 1/2" flat washer, (2)
required per anchor boit
Sheet 2, Elevation, callout, "Anchor bolt 1/2" x 28" full thread �(4) required 1/2" hex nuts �
(4) required per anchor boit" is revised to read Anchor bolt 3/4" x 36" full thread �(4)
required 3/4" heavy hex nuts �(4) required per anchor bolt"
J-20 16
Elevation, callout, "1/4" Premolded Joint Filler" is revised to read, "3/8" Premolded Jomt
Fdler"
Add General Note 9"Junction Box servmg the Standard shall preferably be located 5' — 0"
(10' — 0" Max ) from the Standard "
J-21 10-03
� Sheet 1, Round Concrete Foundation Detail, Elevation, callout, "3/4" hex nuts, steel, (4)
Req'd per Anchor Bolt" is revised to read, Anchor bolt 3/4" x 30" full thread �{4) required
3/4" heavy hex nuts, steel, (4) Req'd per Anchor Bolt
�
��
�
�
�
�
Sheet 1, Square Concrete Foundation Detail, Elevation, callout, "3/4" hex nuts, steel, (4)
Req'd per Anchor Bolt" is revised to read, Anchor bolt 3/4" x 30" full thread �(4) required
3/4" heavy hex nuts, steel, (4) Req'd per Anchor Bolt
Sheet 1, Detail C, callout, "Base Plate Assembly � 1/2" Diam steel hex nut, with 1 1/2" flat
washer, 2 each req'd per anchor bolt � mirnmum of 2 threads above top of nut or 5/8°
maximum (Typ )" is revised to read, Base Plate Assembly � 3/4" heavy hex nut, with 3/4"
flat washer, 2 each req'd per anchor bolt � mirnmum of 2 threads above top of nut or 5/8"
maximum (Typ )"
Sheet 2, Round Concrete Foundation Detail, Elevation, callout, "Anchor Bolts �(4) req'd
per assembly (Typ )" is revised to read, Anchor Bolt 3/4" x 30" full thread �(4) req'd per
assembly (Typ }"
Callout, "3/4" hex nuts, steel �(4) req'd per anchor bolt" is revised to read, 3/4" heavy hex
nuts, steel �(4) req'd per anchor bolt
C�ty of Bremerton Bremerton Pro�ect No 6187
BVR and LFR Preservation Pro�ect l�1-57 September 2013
Contrect Documents Standard Plans
�
u
Sheet 2, Round Concrete Foundat�on Detail, Elevation, callout, "Anchor Boits �(4) req'd
per assembly (Typ )" is revised to read, Anchor Bolt 314" x 30" fuli thread �(4) req'd per
assembiy (Typ )"
Caliout, "3/4" hex nuts, steel �(4) req'd per anchor bolY' is revised to read, 3/4" heavy hex
nuts, steel �(4) req'd per anchor bolt
J-22 15-01
Ramp Meter Signal Standard, elevation, dimension 4'6" is rev�sed to read, 6'-0"
J-29 10
Galvanized Welded Wire Mesh detail, callout —"Drill and Tap for 1/4" Diam Cap Screw, 3
Places, @ 9" center, all 4 edges S S Screw, ASTM F593 and washer"
Is revised to read,
"Drdl and Tap for 1/4" Diam Cap Screw, 3 Places, @ 9" center, all 4 edges S S Screw,
ASTM F593 and washer Liberally coat the threads with Anti-seize Compound "
J-29 15
Title, "Camera Pole Standard" is revised to read, "Camera Pole Standard Details"
J-29-16
Title, "Camera Pole Standard Detads" is revised to read, "Camera Pole Details"
J-60 14
All references to J-16b (6x) are revised to read, J-60 11
J-75 40
Monotube Sign Structure, elevation, cailout — EQUIPMEiVT GROUNDING CONDUCTOR �
SIZE PER NEC MINIMUM SIZE # 8
Is revised to read, EQUIPMENT GROUNDING CONDUCTOR � SIZE PER NEC minimum
size # 4 AWG
Detad C, callout— EQUIPMENT GROUNDING CONDUCTOR � CLAMP TO STEEL
REINFORCING BAR, S(ZE PER NEC MIN SIZE # 8
Is revised to read, EQUIPMENT GROUNDING CONDUCTOR � CLAMP TO STEEL
REINFORCING BAR, SIZE PER NEC mirnmum size # 4 AWG
Detad C, callout — Stainless Steel, selftapping 1/4" Diam Screw w/ S S Washer, space
approx 9" O C is revised to read, "Stainless Steel, selftapping 1/4" Diam Screw w/ S S
Washer, space approx 9" O C, liberally coat the threads with Anti-seize compound"
J-75 45
elevation, callout — EQUIPMENT GROUNDING CONDUCTOR � SIZE PER NEC
MINIMUM SIZE # 8
Is revised to read
EQUIPMENT GROUNDING CONDUCTOR � SIZE PER NEC minimum size # 4 AWG
Detail D, callout— EQUIPMENT GROUNDING CONDUCTOR � CLAMP TO STEEL
REINFORCING BAR, SIZE PER NEC MIN SIZE # 8
City of Bremerton Bremerton Pro/ect No 6187
BVR and LFR Preservat�on Pro�ect lll-58 September 2013
Contract Documents Standard Plarrs
�
�
�
�
�
�
�
�
C
�
�
�
�
�
��
�
�
�
�
�
�
�
Is revised to read
EQUIPMENT GROUNDING CONDUCTOR � CLAMP TO STEEL REINFORCING BAR,
SIZE PER NEC mirnmum size # 4 AWG
Detail C, callout — Stamless Steel, selftapping 1/4" Diam Screw w/ S S Washer, space
approx 9" O C is revised to read, "Stainless Steel, selftapping 1/4" Diam Screw wi S S
Washer, space approx 9" O C, liberally coat the threads with Anti-seize compound"
� J-90 10
Section B, callout, "Hardware Mounting Rack � S S 1-5/8" Slotted Channei" is revised to
read "Hardware Mounting Rack (Typ )� Type 304 S S 1-5/8" Slotted Channel"
�
L�
LJ
J-90 20
Section B, callout, "Hardware Mounting Rack (Typ )� S S 1-5/8" Slotted Channel" is
revised to read "Hardware Mountmg Rack (Typ )� Type 304 S S 1-5/8" Slotted Channel"
K-80 30
In the NARROW BASE, END view, the reference to Std Plan C-8e is revised to Std Plan
K-80 35
The following are the Standard Plan numbers applicable at the time this pro�ect was
� advertised The date shown with each plan number is the publication appraval date shown
in the lower right-hand corner of that plan Standard Plans showing different dates shall not
be used in this contract
�
�
�
�
LJ
A-10 10-00
A-10 20-00
A-10 30-00
A-20 10-00
A-30 10-00
A-30 15-00
A-30 30-01
snio�
10/5/07
10/5/07
8/31 /07
11/8/07
11 /8/07
6/16/11
B-5 20-01 6/16/11
B-5 40-01 6/16/11
B-5 60-01 6/16/11
8-10 20-01 2/7/12
B-10 40-00 6/1/06
B-10 60-00 6/8106
� B-15 20-01 2/7/12
B-15 40-01 2/7/12
B-15 60-01 2/7/12
� B-20 20-02 3/16/12
� B-20 40-03 3/16/12
B-20 60-03 3/15/12
B-25 20-01 3i15/12
� C►ty of Bremerton
BVR and LFR Preservat�on Pro�ect
Contrect Documents
�
A-30 35-00
A-40 00-00
A-40 10-02
A-40 15-00
A-40 20-02
A-40 50-01
A-50 10-00
B-30 50-01
B-30 70-03
B-30 80-00
B-30 90-01
B-35 20-00
B-35 40-00
10/12/07
8/11 /09
6/2/11
8/11 /09
5/29/13
6/2/11
1 'i /17/08
4/26/12
4/26112
6/8/06
9/20/07
6/8/06
6/8/06
B-40 20-00 6/1 /06
B-40 40-01 6/16/10
B-45 20-00 6/1 /06
B-45 40-00 6/1/06
B-50 20-00 6/1/06
B-55 20-00 6/1/06
B-60 20-00 6/8/06
ll!-59
A-50 20-01
A-50 30-00
A-50 40-00
A-60 10-01
A-60 20-02
A-60 30-00
A-60 40-00
B-75 20-01
B-75 50-01
B-75 60-00
B-80 20-00
B-80 40-00
B-82 20-00
9/22/09
11 /17/08
11 /17/08
10/14/09
6/2/11
'I 1 /8/07
8/31 /07
6/10/08
6/10/08
6/8/06
6/8/06
6/1 /06
6/1 /06
B-85 10-01 6/10/08
B-85 20-00 6/1/06
B-85 30-00 6/1/06
B-85 40-00 6/8/06
8-85 50-01 6/10/08
B-9010-00 6/8/06
B-90 20-00 6/8/06
Bremerton Profect No 6187
September 2013
Standard Plans
B-25 60-00
B-30 10-01
B-30 20-02
B-30 30-01
B-30 40-01
C-1
C-1 a
C-1 b
C-1 c
C-1 d
C-2
C-2a
C-2b
G2c
C-2d
C-2e
C-2f
C-2g
C-2h
C-2i
C-2�
C-2k
C-2n
C-2o
C-2p
C-3
C-3a
C-3b
C-3c
C-4b
C-4e
C-4f
6/1 /06
4/26/12
4/26/12
4/26/12
4/26/12
6/16/11
10/14/09
6/16/11
5/30/97
10/31 /03
1 /6/00
6/21 /06
6/21 /06
6/21 /06
6/21 /06
6/29 /06
3/14/97
7/27/01
3/28/97
3/28l97
6/12/98
7/27/01
7/27/01
7/13/01
10/31 /03
6/27/11
10/4/05
6/27/11
6/27/11
6/8/06
2/20/03
7/2/12
B-60 40-00
B-65 20-01
B-65 40-00
B-70 20-00
B-70 60-00
C-6
C-6a
C-6c
C-6d
C-6f
C-7
C-7a
C-8
C-8a
C-8b
C-8e
C-8f
C-10
C-16a
C-16b
C-20 10-01
C-20 14-02
C-20 15-01
C-20 18-01
C-20 19-01
C-20 40-03
C-20 42-03
C-20 45 01
C-22 14-02
C-22 16-03
C-22 40-02
C-22 45 00
6/1 /06 B-90 30-00
4/26/12 B-90 40-00
6/1/06 B-90 50-00
6/1 /06 B-95 20-01
6/1 J06 B-95 40-00
5/30/97 C-23 60-02
10/14/09 C 24 10-00
1 /6/00 C-25 18-03
5/30/97 C-25 20-05
7/25/97 C-25 22-04
6/16/11 C-25 26-02
6/16/11 C-25 80-02
2/10/09 C-4014-02
7/25/97 C-4016-02
6/27/11 C-4018-02
2/21 /07 C-70 10-00
6/3Q/04 C-7510-00
6/3/10 C-75 20-00
6/3/10 C-75 30-00
6/3/10 C-8010-00
6/20/13 C-80 20-00
7/2/12 C-80 30-00
7/2/12 C-80 40-00
7/2/12 C-80 50-00
7/2/12 C-8510-00
7/2/12 C-8511-00
7/2/12 C-8514-00
7/2/12 C-8515-00
6/16/11 C-8516-00
4/18<12 C-85-18-00
6/16/10 C-85 20-00
6/16/11 C-9010-00
6/8/06
6/8/06
6/8/06
2/3/09
6/8/06
6/21/12
7/12/12
7/2/12
7/2/12
7/2/12
712/12
7/2/12
7/2/12
7/2/12
7/2/12
4/8/12
4/8/12
4/8/12
4/8/12
4/8/12
4/8/12
4/8/12
4/8/12
4/8/12
4/8/12
4/8/12
6/16/11
6/16/11
6/16/11
6/16/11
6/16/11
7/3/08
Gty of 8remerton Bremerton Pro�ect No 6187
BVR and LFR Preservation Pro�ect Ill-60 September 2013
Contract Documents Standard Plans
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
D-2 04-00 11/10/05 D-2 48-00
D-2 06-01 1/6/09 D-2 64-01
D-2 08-00 11 /10/05 D-2 66-00
D-2 14-00 11 /10/05 D-2 68-00
D-2 80-00
D-2 16-00 'I 1 /10/05
D-2 18-00 11/10/05 D-2 82-00
D-2 20-00 11 /10/05 D-2 84-00
D-2 32-00 11 /10/05 D-2 86-00
D-2 88-00
D-2 34-01 1 /6/09
D-2 92-00
D-2 36-02 1/6/09
D-2 42-00 11 /10/05 D-3 09-00
D-2 44-00 11 /10/05 D-3 10-01
D-2 60-00 11 /10/05 D-3 11-02
D-2 62-00 11 /10/05 D-3 15-02
D-2 46-00 11/10/05 D-3 16-02
E-1
E-2
2/21 /07 E-4
5/29/98 E-4a
F-10 12-02
F-10 16-00
F-10 18-00
F-10 40-02
F-10 42-00
G-10 10-00
G-20 10-00
G-22 10-01
G-24 10-00
G-24 20-01
G-24 30-01
G-24 40-03
G-24 50-02
H-10 10-00
H-10 15-00
H-30 10-00
6/16/11 F-10 62-01
12/20/06 F-10 64-02
6/27/11 F-3010-02
6/21 /12 F-40 12-02
F-40 14-02
1 /23/07
9/20/07
9/20/07
7/3/08
11 /8/07
2/7/12
2/7/12
6/20/13
6/20/13
11 /10/05
1 /6/09
11/10/05
11/10/05
11 /10/05
11/10/05
11 /10/05
11/10/05
11 /10/05
11 /10/05
5/17/12
5/29/13
5/29/13
6/10/13
5/29/13
8/27/03
8/27/03
9/05/07
7/3/08
6/20/13
6/20/13
6/20/13
G-24 60-02 5/20/13
G-2510-04 6/10/13
G-3010-02 6/20/13
G-50 10-01 6/20/13
G-6010-02 6/10/13
G-60 20-01 6/27/11
G-60 30-01 6/27/11
G-7010-02 6/10/13
7/3/08 H-3210-00
7/3/08 H-6010-01
10/12/07 H-60 20-01
�
� Ciry of Bremerton
8VR and LFR Preservat�on Pro/ect
Contract Documents
9/20/07
7/3/08
7/3/08
Ill-61
D-3 17-01
D-4
D-6
D-10 10-01
D-10 15-01
D-10 20-00
D-10 25-00
D-10 30-00
D-10 35-00
D-10 40-01
D-10 45-01
D-15 10-01
D-15 20-02
D-15 30-01
F-40 15-02
F-40 16-02
F-45 10-01
F-80 10-02
5/17/12
12/11 /98
6/19/98
12/2/08
12/2/08
7/8/Q8
7/8/08
7/8/08
7/8/08
12/2/08
12/2/08
12/2/08
6I2/11
12/02/08
6/20/13
6/20/13
6/21 /12
3/15/12
G-70 20-02 6/10/13
G-70 30-02 6/10/13
G-90 10-01 5/11 /11
G-90 20-02 3/22/13
G-90 30-02 3/25/13
G-90 40-01 10/14/09
G-95 10-01 6/2/11
G-95 20-02 6/2/11
G-95 30-02 6/2/11
H-70 10-01 2/7/12
H-70 20-01 2/16/12
H-70 30-02 2/7/12
Bremerton Pro�ect No 6187
September 2013
StandaM Plans
�
1-10 10-01
I-30 10-02
I-30 15-02
I-30 16-00
I-30 17-00
J-3
J-3b
J-3c
J-10
J-10 10-01
J-10 15-00
J-10 22-00
J-15 10-00
J-15 15-00
J-16b
J-16c
J-20 10-02
J-20 11-01
J-20 15-02
J-20 16-01
J-20 20-02
J-20 26-01
J-21 10-03
J-21 15-01
J-21 16-01
J-21 17-01
J-21 20-01
J-22 15-01
J-22 16-02
J-26 10-02
K-70 20-00
K-80 10-00
K-80 20-00
K-80 30-00
K-80 35-00
K-80 37-00
L-10 10-02
L-20 10-02
L-30 10-01
8/11 /09
3/22/13
3/22/13
3/22/13
3/22/13
8/1/97
3/4/05
6/24/02
7/18/97
5/11/11
7/2/12
5/29/13
5/8/12
6/16/10
2/10/09
2/10/09
6/10/13
6/10/13
6/10/13
7/12/12
5/20/13
7/12/12
6/10/13
6/10/13
6/10/13
6/10/13
6/10/13
6/10/13
6/10/13
3/15/12
2/15/07
2/21 /07
12/20/06
2/21 !07
2/21 /07
2/21 /07
6/21/12
6/21 /12
6/16/11
I-30 20-00
I-30 30-01
I-30 40-01
I-30 6Q-00
I-40 10-00
J-26 15-01
J-27 10-00
J-27 15-00
J-28 10-01
J-28 22-00
J-28 24-00
J-28 26-01
J-28 30-02
J-28 40-09
J-28 42-00
J-28 45-01
J-28 50-02
J-28 60-01
J-28 70-01
J-29 10-00
J-29 15-00
J-29 16-01
J-40 10-03
J-40 20-01
J-40 30-03
J-40 35-01
J-40 36-01
J-40 37-01
J-40 38-01
J-40 39-00
L-40 10-02
L-40 15-01
L-40 20-02
9/20/07
6/10/13
6/10/13
5/29/13
9/20/07
5/17/12
3/15/12
3/15/12
5/11/11
8l07/07
8/07/07
12/02/08
6/27/11
10/14/09
8/07/07
6/27/11
6/2/11
6/2/11
5J11/11
6/27/11
6/27/11
6/20/13
5/20/13
5/17/12
5/20/13
5/29/13
5/20/13
5/20/13
5/20/13
5/20/13
I-40 20-00
I-50 20-01
I-60 10-01
I-60 20-01
i-80 10-01
J-40 40-00
J-50 10-00
J-50 11-00
J-50 12-00
J-50 15-00
J-50 16-01
J-50 20-00
J-50 25-00
J-50 30-00
J-60 05-00
J-60 11-00
J-60 12-00
J-60 13-00
J-60 14-00
J-75 10-01
J-75 20-00
J-75 30-01
J-75 40-00
J-75 45-00
J-90 10-01
J-90 20-01
6/21 /12 L-70 10-01
6/16/11 L-70 20-01
6/21 /12
9/20/07
6/20/13
6/10/13
6/10/13
8/11 /09
5/20/13
6/3/11
6!3/11
6/3/11
6/3/11
3/22/13
6/3/11
6/3/11
6/3/11
6/16/11
5/20/13
5/20/13
6/16/10
6/16/10
5/11/11
2/10/09
5/11/11
10/14/09
10/14/09
6/27/11
6/27/11
5/21 /08
5/21 /08
C�ly of Bremerton Bremerton P►��ect No 6187
BVR and LFR Preservatron Pro�ect lll-62 September 2013
Contract Documents Standard Plans
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
M-1 20-02
M-1 40-02
M-1 60-02
M-1 80-03
M-2 20-02
M-3 10-03
M-3 20-02
M-3 30-03
M-3 40-03
M-3 50-02
M-5 10-02
M-7 50-01
M-9 50-01
6/3/11 M-9 60-00 2/10/09 M-40 10-02 5/11/11
6/3/11 M-11 10-01 1/30/07 M-40 20-00 10/12/07
6/3/11 M-15 10-01 2/6/07 M-40 30-00 9/20/07
6/3/11 M-17 10-02 7/3/08 M-40 40-00 9/20/07
6/3/11 M-20 10-02 6I3/11 M-40 50-00 9/20/07
6/3/11 M-20 20-01 1/30/07 M-40 60-00 9/20/07
6/3/11 M-20 30-02 10/14/09 M-60 10-01 � 6/3/11
6/3/11 M-20 40-02 6/3/11 M-60 20-02 6/27/11
6/3/11 M-20 50-02 6/3/11 M-65 10-02 5/11/11
6/3/11 M-24 2Q-01 5/31/06 M-80 10-01 6/3/11
6/3/11 M-24 40-01 5/31 /06 M-80 20-00 6/10/08
1/30/07 M-24 50-00 6/16/11 M-80 30-00 6/10/08
1 /30/07 M-24 60-03 5/11 /11
END OF STANDARD PLANS
C�ty of Bremerfon
BVR and LFR P►�ese�vat�on Pro/ect
Contract Documents
I/l-63
Bremerton Pro�ect No 6187
September 2013
Sfandard Plans
�
�
� '
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
r
APPENDIX A
PREVAILING WAGE RATES
<
r
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
Page 1 of 17
State of Washington
Department of Labor & Industries
Preva�l�ng Wage Sect�on - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage
The PREVAILING WAGES listed here �nclude both the hourly wage rate and the hourly rate
of fnnge benefits On public works pro�ects, workers wage and benef�t rates must add to
not less than th�s total A bnef descnpt�on of overtime calculat�on requ�rements are
prov�ded on the Benef�t Code Key
Journey Level Prevailing Wage Rates for the Effective Date
9/13/2013
Coun
K�tsap
Kitsap
K�tsap
K�tsap
K�tsap
K�tsap Cab�net Ma
K�tsap Carpenters
K�tsap Carpenters
Kitsap Carpenters
Kitsau Cement Ma
Job Classif�catu
Journey Level
Journey Level
Brick And Block Fm�sher
Journey Level
Pointer-Cautker-Cteaner
Jarntor
Shampooer
Waxer
Window Cleaner
Journey Level
Acoustual Worker
Br�dge, Dock And Wharf
Carpenters
Carpenter
Carpenters on Stat�onar�
Creosoted Matenal
Floor Firnsher
Floor Layer
Scaffold Erector
Journev Level
$41 69 5D
$30 34
$43 26 5A
$50 12 5A
$50 12 SA
$9 19
$9 19
$9 19
$13 22
$23 72
$50 82 5D
$50 82 5D
$50 82 SD
Tools $50 95 5D
$50 92 5D
$50 82 �
$50 82 SD
$50 82 5D
$51 18 7A
Note
1H
1
1M
1M
1M
1M
�
1M
1.M
1M
�
1M
1M $L
1M
1M
1M
1B
�
�
9/13/2013
K�tsap A�vers & Tenders Drver $100 28 5�
Kitsap D�vers & Tenders Drver On Standby $56 68 5D
K�tsap D�vers & Tenders Drver Tender $52 23 5D
K�tsap D�vers & Tenders Surface Rcv & Rov Operator $52 23 5D
K�tsap Divers & Tenders Surface Rcv 8 Rov Operator $48 67 5A
Tender
K�tsap DredQe Workers Ass�stant Engmeer $53 00 5�1
Kitsap Dredge Workers Ass�stant Mate (Deckhand) $52 58 5�
https //fortress wa gov/lni/wagelookup/prvWagelookup aspx
Kitsa
Workers Boatmen
Workers Engineer Welder
Workers Leverman, Hydraulu
Workers Mates
Workers O�ter
Kitsap DrywaU Appiicator
K�tsap Riywall Tapers
Kitsap Electncat F�xture Ma�nt�
orkers
Kitsap Etectncians - Inside
Kitsap Etectnaans - hAotor Sho
Kitsap Electncians - Motor Sho
Kitsap Electricians - Powertine
Construction
K�tsap Electr�c�ans - Powerline
Construct�on
K�tsap Electr�aans Powerkme
Construct�on
Kitsap Electriaans - Powertine
Construct�on
K�tsap Electruians - Powert�ne
Construction
K�tsap Electnc�ans - Powertme
Const ruct�on
Kitsap Electriaans - Powerime
Construction
K�tsap Electnc�ans - Powerline
Const�uct
Kitsap Etectromc Techmc�ans
Kitsap Elevator Constructors
Kitsap Elevator Constructors
Kitsap Fabncated Precast Conc
Products
K�tsap Fence Erectors
K�tsap Fence Erectors
K�tsap er
Kitsap Glaziers
K�tsap Heat St Frost Insulators �
Krtsap Hod Carners Ft Mason Tei
Kitsap Industr�al Power Vacuum
leaner
Kitsap Inland Boatmen
K�tsap �Intand Boatmen
Journey Level
Journey Level
Journey Level
Journey Level
Craftsman
Journey Level
Cable Splicer
Cert�f�ed Line Welder
Groundperson
Heavy Line Equipment
Operator
Journey Level L�neper5on
Line Equ�pment Operator
Pole Sprayer
Powderperson
Journey Level
Mecharnc
Mechamc In Charge
Journey Level - In-Factory
Work Only
Fence Erector
Fence Laborer
Journey Level
Journey �evel
Journeyman
Journey Level
Journey Level
Journey Levet
Boat Operator
Cook
Deckhand
Deckhand Eng�neer
$52 30 5D
$54 04 5D
$55 17 ,5�
$52 30 5D
$52 58 5D
$50 82 5D
$49 79 5P
$31 74
$51 26
$15 37
$14 69
$66 43 5A
$60 75 �
$42 36 5A
$b0 75 5A
$60 75 5A
$51 05 5A
$60 75 5A
$45 39 5A
$44 78 7E
$77 70 7D
$84 24 7D
$13 50
$13 80
$11 60
$35 34 7A
$53 76 7L
$58 93 ,�
$69 37 7F
$42 99 7A
$9 24
$52 51 56
$48 89 5B
$49 13 5B
$50 12 56
Page 2 of 17
�
3F
�
3F
3F
1H
1E
1
1
1
4A
4A
4A
4A
4A
4A
4A
4A
�
1
1
1
�
15
2Y
1
1K
1K
https 1/fortress wa gov/lni/wagelookup/prvWagelookup aspx 9/13/2013
'
�
�
i
r
�
�
�
�
�
�
�
�
�
�
�
�
�
�
Kitsap
Kitsap
Kitsap
Krtsap �Inspection/Cleam
Launch Operator $51 34 56
Mate $51 34 5B
Cleaner Operator, Foamer $9 73
Operator
Grout Truck Operator $11 48
Kitsap Inspection/Cleamn�/5ealin� Of Head Operator $12 78
Sewer �t Water Svstems By
Remote Cont�ol
K�tsap Inspectian/CleamnQlSealinQ Of Tv Truck Operator $24 17
Remote Controt
Kitsap Insutat�on A�pl�cators
Kitsap Ironworkers
Kitsap i..abore,�s
Kitsap bo e s
Kitsap Laborers
Kitsap Laborers
Kitsap Laborers
Kitsap Laborers
Kitsap Laborers
Kitsap �aborers
Kitsap Labarers
Kitsap Laborers
Kitsap Laborers
K�tsap Laborers
K�tsap Laborers
K�tsap
K�tsap
K�tsap
K�tsap
Kitsap
K�tsap
K�tsap
K�tsap
K�tsap �Laborers
Journey Level $50 82 5D
Journeyman $59 77 7N
Air, Gas Or Electnc Vibrating $41 69 7A
Screed
A�rtrac Drill Operator $42 99 7A
Batlast Regular Machine $41 69 7A
Batch We�ghman $35 34 7A
Brick Pavers $41 69 7A
Brush Cutter $41 69 7A
Brush Hog Feeder $41 69 7A
Burner $4169 7A
Caisson Worker $42 99 7�
Carpenter Tender $41 69 7A
Caulker $41 69 7A
Cement Dumper-pav�ng $42 46 7A
Cement Firnsher Tender $41 69 7A
Change House Or Dry Shack $41 69 7A
Chipping Gun (under 30 Lbs ) $41 69 7A
Ch�pp�ng Gun(30 Lbs And $42 46 7A
Over)
Choker5etter $41 69 7A
Chuck Tender $41 69 7,�/
Clary Power Spreader $42 46 7A
Clean-up Laborer $41 69 �
Concrete Dumper/chute $42 46 7A
Operator
Concrete Form Stnpper $41 69 7A
Concrete Placement Crew $42 46 7A
Concrete Saw Operator/core $42 46 7A
Dnller
Crusher Feeder $35 34 7A
Cunng Laborer $41 69 7A
Demol�tion Wrecking Ft Mov�ng $41 69 7A
https //fortress wa gov/lm/wagelookup/prvWagelookup aspx
Page 3 of 17
�K
1
1
1
1
�
10
2Y
2Y
2Y
2Y
2Y
�
2Y
�
2Y
2Y
2Y
2Y
2Y
�
2Y
�Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
9/13/2013
,
Page 4 of 17
Kitsap
Kitsap
Kttsap Laborers
Kitsap Laborers
Kitsap L orers
Kitsap Laborers
K�tsap b er
Kitsap Laborers
Kitsap Laborers
Kitsap Laborers
Kitsap Laborers
Kitsap Laborers
K�tsap
Kitsap
Kitsap
Kitsap
K�tsap
Kitsap
K�tsap
K�tsap
Kitsap La orer
Kitsap Laborers
Kitsap Laborers
Kitsap Laborers
Kitsap La ore�s
K�tsap Laborers
Kitsap Laborers
Kitsap
Kitsap
(incl Charred Matenal)
Ditch Digger $41 69 7A
Drver $42 99 �
Dnll Operator $42 46 7A
{hydraulu,diamond)
Dry Stack Walls $41 69 7A
Durnp Person $41 69 7A
Epoxy Techrncian $41 69 7A
Erosion Control Worker $41 69 7A
Faller St Bucker Chain Saw $42 46 7A
Fine Graders $41 69 �
Firewatch $35 34 7A
Form Setter $41 69 �
Gabian 8asket Bu�tders $41 69 7A
General Laborer $41 69 7A
Grade Checker �t Transit $42 99 7A
Person
Gnnders $41 69 7A
Grout Machine Tender $41 69 ]�
Groutmen (pressure)includ�ng $42 46 �
Post Tens�on Beams
Guardrail Erector $41 69 �
Hazardous Waste Worker (level $42 99 7A
A)
Hazardous Waste Worker (level $42 46 7A
B)
Hazardous Waste Worker (level $41 69 7A
C)
H�gh Scaler $42 99 7A
Jackhammer $42 46 7A
Laserbeam Operator $42 46 7A
Maintenance Person $41 69 7A
Manhole Builder-mudman $42 46 7A
Matenal Yard Person $41 69 7A
Motorman-d�nky Locomotrve $42 46 7A
Nozzleman {concrete Pump, $42 46 �
Green Cutter When Using
Comb�nation Of Ht�h Pressure
Air ft Water On Concrete Ft
Rock, Sandblast, Gumte,
Shotcrete, Water Bla
Pavement Breaker S42 46 7A
Pilot Car $35 34 �
P�pe layer Lead $42 99 7A
P�pe Layer/tailor $42 46 7A
Pipe Pot Tender $42 46 7A
Pipe Rel�ner $42 46 �
2Y
2Y
2Y
2Y
�Y
2Y
2Y
�
2Y
ZY
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
https //fortress wa gov/im/wagelookup/prvWagelookup aspx 9/13/2013
�
�
�
�
�
'
�
�
�
�
�
�
�
�
�
�
�
�
�
Kitsap Laborers Pipe Wrapper $42 46 7A
Kitsap Laborers Pot Tender $41 69 7A
K�tsap borers Powderman $42 99 7A
Kitsap Laborers Powderman s Helper $41 69 7A
Kitsap Laborers Power Jacks $42 46 7A
Kitsap Laborers Railroad Spike Puller - Power $42 46 7A
Kitsap Laborers Raker - Asphatt $42 99 7A
Kitsap Laborers Re-timberman $42 99 7A
Kitsap Laborers Remote Equipment Operator $42 46 7A
Kitsap Laborers Rigger/signal Person $42 46 7A
K�tsap Laborers Rip Rap Person $41 69 7A
Kitsap Labore�s Rrvet Buster $42 46 7A
Kitsap Laborers Rodder $42 46 7A
K�tsap Laborers Scaffotd Erector $41 69 7A
Kitsap Laborers Scale Person $41 69 7A
Kitsap Laborers Sloper (over 20 ) $42 46 7A
Kitsap Laborers Stoper Sprayer $41 69 7A
Kitsap laborers Spreader (concrete) $42 46 7A
Kitsap bo ers Stake Hopper $41 69 7A
Kitsap Laborers Stock Piler $41 69 7A
Kitsap Laborers Tamper & S�milar Electnc, A�r $42 46 7A
£t Gas Operated Tools
Kitsap Laborers Tamper (multiple �t Self- $42 46 7A
propelled)
Kitsap Laborers T�mber Person - Sewer {lagger, $42 46 7A
Shorer �t Cnbber)
Kitsap Laborers Toolroom Person (at Jobsite) $41 69 7A
Kitsap Laborers Topper $4169 7A
Kitsap Laborers Track Laborer $41 69 7A
Kitsap L or rs Track L�ner (p�wer) $42 46 j�
Kitsap Laborers Traffic Control Laborer $37 79 7A
Kitsap Laborers Traffic Control Superv�sor $37 79 J�
K�tsap Laborers Truck Spotter $41 69 7A
K�tsap re s Tugger Operator $42 46 �
Kitsap Laborers Tunnel Work-Compressed A�r $60 06 7A
Worker 0-30 psi
K�tsap Laborers Tunnet Work-Compressed Air $65 09 7A
Worker 30 01-44 00 psi
K�tsap er Tunnel Work-Compressed A�r $68 77 �
Worker 44 01-54 00 psi
K�tsap bo e s Tunnel Work-Compressed A�r $74 47 7A
Worker 54 01-60 00 psi
Kitsap Laborers Tunnel Work-Compressed A�r $76 59 7A
Worker 60 01-64 00 psi
Kitsap Laborers Tunnel Work-Compressed Air $81 69 �
Worker 64 01-68 00 ps�
https //fortress wa gov/lm/wagelookup/prvWagelookup aspx
Page 5 of 17
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
2Y
3Y
�
2Y
2Y
2Y
2Y
2Y
�
2Y
3Y
�Y
2Y
2Y
2Y
�Y
2Y
�
�
�
�
�
�
�
9/ 13/2013
Page 6 of 17
Kitsap
Kitsap
K�tsap
Kitsap
Tunnel Work-Compressed A�r
Worker 68 01-70 00 ps�
Tunnet Work Compressed Air
Worker 70 01-72 00 ps�
Tunnel Work-Compressed A�r
Worker 72 01-74 00 psi
Tunnel Work Guage and Lock
Tender
Tunnel Work-Miner
Vibrator
Vinyl Seamer
Watchman
Welder
Well Pomt Laborer
Wmdow Washer/cleaner
General Laborer � Topman
$83 59 7A
$85 59 7A
$87 59 7A
$43 09 7A
$43 09 7A
$42 46 7A
$41 69 7A
$32 12 7A
$42 46 7A
$42 46 7A
$32 12 7A
$41 69 7A
$42 46 7A
2Y
1 li
1H
2Y
2Y
�
�
�
�
�
Kitsap Laborers
K�tsap Laborers
K�tsap Laborers
Kitsap Laborers
K�tsap La orers
K�tsap Laborers
Kttsap L orers
Kitsap Laborers - U
�t Water
K�tsap Laborers - U
£t Water
Kitsap Landscape C
Kitsap Landscape C
Kitsap Landscape C
Kitsap Lathers
K�tsap Marbte Sett�
Pipe Layer
Irngation Or Lawn Spnnkler
Installers
Landscape Equ�pment
Operators Or Truck Dnvers
Landscaping Or Plant�ng
Laborers
JOURNEY LEVEL
Journev Level
Kitsap Metal Fabncat�on (In Shop� Fitter
Kitsap Metat Fabncat�on (in Shop) Laborer
K�tsap Metat Fabr�cat�on tln Shoo) Mach�ne Operator
K�tsap Metat Fabricat�on (In Shop) Wetder
Kitsap Millwrieht Journey Level
Kitsap Modutar Build�n�s Cabmet Assembly
K�tsap Modutar Bu�tdings Electruian
Kitsap Modutar Bu�td�n�s Equ�pment Maintenance
Kitsap Modutar Bu�td�n�,s Plumber
Krtsap Modutar Bu�tdin�s Product�on Worker
Krtsap Modutar Buitd�n�s Tool Maintenance
Kitsap Modular Bu�ld�ngs Ut�hty Person
Kitsap Modutar Bu�ld�nes Welder
Kitsap Pa�nters Journey Level
Kitsap Pile Dnver Journey Level
Kitsap pt�.�terers Journey Level
Krtsap Play�round & Park Equipment Journey Level
Instalters
Kitsap Plumbers £t Pipef�tters Journey Level
$9 25
$10 05
$12 92
$21 00
$50 12 5A
$26 96
$9 19
$13 83
$13 83
$44 89
$11 56
$11 56
$11 56
$11 56
$9 40
$11 56
$11 56
$11 56
$36 64 6Z
$51 07 5D
$49 29 7�C
$9 19
$61 57 5A
2Y
2Y
2Y
�Y
2Y
2Y
1
1
Z
1
1
1
1
1
1
1
1
1
1
1
2B
1M
1R
1
https //fortress wa gov/lm/wagelookup/prvWagelookup aspx 9/13/2013
�
�
�
�
�
r
�
�
�
�
,
�
�
�
�
,
�
�
�
Kitsap Power Equ�pment Ooerators Asphalt Plant Operators $53 49 �
Kitsap Power Equ�pment Operators Assistant Engineer $50 22 7A
Kitsap Power Eau�pment Ooerators Barner Machme (z�pper) $53 00 ]q
Kitsap Power Equipment Operators Batch Plant Operator, $53 00 7A
Concrete
Kitsap Power Equ�pment Operators Bobcat $50 22 7A
Kitsap Power Equipment Operators Brokk - Remote Demolition $50 22 7A
Equipment
Kitsap Power Equipment Operators Brooms $50 22 7A
Kitsap Power Equipment Operators Bump Cutter $53 00 7A
K�tsap Power Equ�pment Operators Cableways $53 49 7A
Kitsap Power Equipment Operators Chipper $53 00 7A
K�tsap Power Equinment �perators Compressor $50 22 �g
Kitsap Power Equipment Operators Concrete Pump Truck Mount $53 49 7A
With Boom Attachment Over 42
M
K�tsap �Qwer Equ�Qment O�eratars Concrete F�msh Machine -laser $50 22 7�
Screed
Kitsap Power Equipment Operators Concrete Pump - Mounted Or $52 58 7A
Tra�ler High Pressure L�ne
Pump, Pump H�gh Pressure
Kitsap Power Equipment Operators Concrete Pump Truck Mount $53 00 7A
With Boom Attachment Up To
42m
Kitsap Power Equipment Oqerators Conveyors $52 58 7A
K�tsap Power Equ�pment Operators Cranes 20 Tons Through 44 $53 00 7A
Tons W�th Attachments
Kitsap Power Equ�pment Ooerators Cranes 100 Tons Through 199 $54 04 7A
Tons, Or 150 Of Boom
(Includmg J�b W�th
Attachments)
K�tsap Power Equ�pment Ooerators Cranes 200 Tons To 300 Tons, $54 61 7A
Or 250 Of Boom (induding J�b
With Attachments)
Kitsap Power Equipment Operators Cranes 45 Tons Through 99 $53 49 7A
Tons, Under 150 Of Boom
(�ncluding J�b Wrth
Attachments)
K�tsap Power Equ�pment Operators Cranes A-frame - 10 Tons And $50 22 7A
Under
Kitsap Power Equ�pment Operators Cranes Fnction 100 Tons $54 61 7A
Through 199 Tons
Kitsap Power Equ�pment Operators Cranes Friction Over 200 Tons $55 17 7A
Kitsap Power Equipment Operators Cranes Over 300 Tons Or 300 $55 17 7A
Of Boom (mcluding J�b With
Attachments)
Kitsap Power Equ�pment Ooerators Cranes Through 19 Tons With �52 58 7A
Attachments A-frame Over 10
Tons
Kitsap Power Equ�pment Ope�ators Crusher $53 00 7A
https //fortress wa gov/in�/wagelookup/prvWagelookup aspx
Page 7 of 17
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C � 8P
9/13/20I3
K�tsap
Kitsap
Kitsap
Kitsap
Kitsap
Kitsap
Kitsap
Kitsap
K�tsap
Kitsap
Kitsap
Kitsap
K�tsap
K�tsap
Krtsap
Kitsap
Kitsap
Kitsap
Kitsap Power Equ�pment
Kitsap Power Egu�qment
Kitsap Power Eauipment
Kitsap Power Equ��r ent
Kitsap Power Equipment
Kitsap Power Equioment
Kitsap Power Equ�pment
Kitsap Power Equ�pment
Kitsap Power Equ�pment
K�tsap Power Equ�pment
Krtsap P���, EQu�pment
Deck Eng�neer/deck Wmches $53 00 �
(power)
Derricks, On Building Work $53 49 7A
Dozers D-9 �t Under $52 58 7A
Dr�ll O�lers Auger Type, Truck $52 58 �
Or Crane Mount
Drilling Machine S53 00 �
Elevator And Man-lift $50 22 7A
Permanent And Shaft Type
F�rnshmg Machine, Bidwelt And $53 00 7A
Gamaco 8 Sim�lar Equ�pment
Forktift 3000 Lbs And Over $52 58 7A
With Attachments
Forklifts Under 3000 Lbs With $50 22 7A
Attachments
Grade Eng�neer Usmg Blue $53 00 7A
Pnnts, Cut Sheets, Etc
Gradechecker/stakeman $50 22 7A
Guardra�l Punch $53 00 7A
Hard Tail End Dump $53 49 7A
Articulat�ng Off- Road
Equ�pment 45 Yards Et Over
Hard Tail End Dump $53 00 7A
Artuulat�ng Off-road
Equipment Under 45 Yards
Honzontal/direct�onat Dr�ll $52 58 7A
Locator
Honzontal/d�rectionat Drill $53 00 Z
Operator
Hydralifts/boom Trucks Over $52 58 7A
10 Tons
Hydrahfts/boom Trucks, 10 $50 22 Zq
Tons And Under
Loader, Overhead 8 Yards £t $54 04 7A
Over
Loader, Overhead, 6 Yards But $53 49 7A
Not Includmg 8 Yards
Loaders, Overhead Under 6 $53 00 �
Yards
Loaders, Plant Feed $53 00 �
Loaders Elevatmg Type Belt $52 58 7A
Locomotrves, All $53 00 7A
Matenal Transfer Dev�ce $53 00 7A
Mechamcs, All (leadmen - $54 04 7A
$0 50 Per Hour Over Mechamc)
Motor Patrol Grader - Non- $52 58 7A
firnshtng
Motor Patrol Graders, F�n�sh�ng $53 49 7A
Mucking Machine, Mole, Tunnel $53 49 �
Page 8 of 17
� 8P
� 8P
3C 8P
3C 8P
3C
3C
3C
3C
3C
8P
8P
8P
8P
8P
3C 8P
3C 8P
3C 8P
3C
3C
3C
3C
3C
3C
3C
�
8P
�
8P
8P
SP
8P
SP
�
3C
3C
3C
3C
3C
8P
8P
8P
�
https //fortress wa gov/in�/wagelookup/prvWagelookup aspx 9/13/2013
'
�
�
'
r
r
�
�
i
�
�
i
�
�
�
�
�
i
�
Kitsap
Kitsap
Kitsap
Kitsap
K�tsap
Kitsap
K�tsap
Kitsap
uL
Kitsap
K�tsap
Dnll, Bormg, Road Header
And/or Shield
Oil Distnbutors, Blower $50 22 7A
Distnbution £t Mulch Seeding
Operator
Outside Hoists (elevators And $52 58 7A
Mant�fts), A�r Tuggers,strato
Overhead, Bridge Type Crane $53 00 7A
20 Tons Through 44 Tons
Overhead, Bridge Type 100 $54 04 7A
Tons And Over
Overhead, Bndge Type 45 $53 49 7A
Tons Through 99 Tons
Pavement Breaker $50 22 lA
Pile Dnver (other Than Crane $53 00 7A
Mount)
Plant O�ler - Asphalt, Crusher $52 58 7A
Posthote Digger, Mecharncat $50 22 7A
Power Plant $50 22 7A
Pumps - Water $50 22 7A
Quad 9, Hd 41, D10 And Over $53 49 7A
Quuk Tower - No Cab, Under $50 22 7A
100 Feet In Height Based To
Boom
Remote Controt Operator On $53 49 7A
Rubber Tired Earth Moving
Equipment
Kitsap Power Eauioment Operators R�gger And Bellman $50 22 7A
Kitsap Power Equipment Operators Roltagon $53 49 7A
Ktitsap Power Equ�pment Operators Rolter, Other 1'han Plant M�x $50 22 7A
Kitsap Power Equ�pment Operators Roller, Plant Mix Or Multrlift $52 58 7A
Matenats
Kitsap Power Equ�pment Operators Roto-mill, Roto-gnnder $53 00 7A
Kitsap Pc�wer Ec�u��ment Ooerators Saws - Concrete $52 58 �
Kitsap Power Equ�pment Operators Scraper, Self Propelled Under $53 00 7A
45 Yards
Kitsap Power Equ�pment Operators Scrapers - Concrete £t Carry All $52 58 7A
Kitsap PQ�er Equ�pment Operators Scrapers, Setf-propelled 45 $53 49 7A
Yards And Over
K�tsap Power Equioment Operators Service Engmeers - Equipment $52 58 7A
K�tsap Power Equipment Operators Shotcrete/gumte Equipment $50 22 7A
Kitsap Power Equ�nment Operato�s Shovel , Excavator, Backhoe, $52 58 7A
Tractors Under 15 Metnc Tons
Kitsap Power Equ�pment Operators Shovet, Excavator, Backhoe $53 49 7A
Over 30 Metric Tons To 50
Metnc 7ons
Kitsap Power Equ�oment O�erators Shovel, Excavator, Backhoes, $53 00 �
Tractors 15 To 30 Metr�c Tons
https //fortress wa gov/Im/wagelookup/prvWagelookup aspx
Page 9 of 17
3C � 8P
3C
3C
3C
3C
8P
SP
8P
8P
3C 8P
� 8P
3C 8P
3C 8P
3C 8P
�C, 8P
3C 8P
3C 8P
� 8P
3C 8P
3C 8P
3C 8P
3C 8P
3C SP
3C 8P
3C 8P
3C 8P
3C 8P
3C 8�
3C 8P
3C � 8P
9/13/2013
Page 10 of 17
Kitsap Power Equioment Operators Shovel, Excavator, Backhoes $54 04 7A
Over 50 Metnc Tons To 90
Metnc Tons
Kitsap Power Eauipment Operators Shovel, Excavator, Backhoes $54 61 7A
Over 90 Metnc Tons
Kitsap Power Equ�qment Operators Sl�pform Pavers $53 49 7A
K�tsap Power Equ�pment Operatars Spreader, Topsider £t $53 49 7A
Screedman
K�tsap Power Equ�qment Operators Subgrader Tnmmer $53 00 7A
Kitsap Power Equ�pment Operators Tower Bucket Elevators $52 58 7A
K�tsap Power Equipment Ooerators Tower Crane Over 175 m $54 61 7A
Height, Base To Boom
K�tsap Power EcLu�pment Operator5 Tower Crane Up To 175 In $54 04 7A
He�ght Base To Boom
K�tsap Power Equ�pment Operatars Transporters, All Track Or $53 49 7�
Truck Type
K�tsap Power Equ�pment Operators Trenching Machines $52 58 �
Kitsap Power Equ�pment Operators Truck Crane Oiler/dnver - 100 $53 00 7A
Tons And Over
Kitsap Power Equipment Operators Truck Crane Oiler/dnver Under $52 58 7A
100 Tons �
Kitsap Power Equ�pment Operators Truck Mount Portable Conveyor $53 00 7A
Kitsap Power Epuipment Operators Welder $53 49 7A
Kitsap Power Equ�pment Opgrators Wheel Tractors, Farmall Type $50 22 7A
Kitsap Power Equ�pment Oqerators Yo Yo Pay Dozer $53 00 7A
Kitsap Power Equ�pment Operators- Asphalt Plant 4perators $53 49 7A
Under�round Sewer £t Water
Kitsap Power Ec�uinment Operators- Assistant Engineer $50 22 7A
Under�round Sewer £t Water
Kitsap Power Eguipment Operators- Barrier Machine (rpper) $53 00 7A
UnderQround Sewer �t Water
Kitsap Power Eau�pment Operators- Batch Plant Operator, $53 00 �
Under�round Sewer Et Water Concrete
Kitsap Power Equ�oment O�erators- Bobcat $50 22 7A
UnderQround Sewer Ft Water
Kitsap Power Equ�pment O�erators- Brokk - Remote Demolit�on $50 22 7A
UnderQround Sewer Ft Water Equ�pment
Kitsap power Equipment O�erators- Brooms $50 22 7A
Underground Sewer �t Water
Kitsap Power Equ��ment Operators- Bump Cutter $53 00 7A
Underground Sewer Ft Water
K�tsap power Eau�pment O e�ators- Cableways $53 49 7A
Under�round Sewer & Water
Kitsap Power Equ�pment Operators- Ch�pper $53 00 7A
Under�round Sewer & Water
Kitsap Power Equipment Operators Compressor $50 22 7A
Underaround Sewer £t Water
Kitsap Power Equ�pment Operators- Concrete Pump Truck Mount $53 49 7A
Under�round Sewer £t Water With Boom Attachment Over 42
3C 8P
3C 8P
3C 8P
�C 8P
3C 8P
3C
3C
3C
3C
3C
3C
3C
8P
8P
�
8P
8P
8P
8P
�
�
3C
3C
�
3C
3C
3C
3C
3C
3C
3C
3C
8P
8P
8P
8P
8P
8P
8P
�
8P
�
8P
8P
8P
https //fortress wa gov/lni/wagelookup/prvWagelookup aspx 9/13/2013
'
'
�
�
�
,
�
�
�
�
�
�
�
'
,
'
�
'
�
M
Kitsap Power Equipment Operators- Concrete Firnsh Machine -laser $50 22 7A
Undereround Sewer 8 Water Screed
Kitsap Power Epu�pment Operators- Concrete Pump - Mounted Or $52 58 7A
Under�round Sewer �C Water Trailer High Pressure Lme
Pump, Pump High Pressure
Kitsap Power Equipment Operators- Concrete Pump Truck Mount $53 00 7A
Under�round Sewer & Water Wrth Boom Attachment Up To
42m
Kitsap Power Equipment Operators Conveyors $52 58 7A
Under�round Sewer f� Water
Kitsap Power Equ�pment Operators- Cranes 20 Tons Through 44 $53 00 7A
Underground Sewer �x Water Tons With Attachments
K�tsap Fower Eauipment Operators- Cranes 100 Tons Through 199 $54 04 7A
Underground Sewer � Water Tons, Or 150 Of Boom
(Including Jib With
Attachments)
K�tsap Power Equipment Operators- Cranes 200 Tons To 300 Tons, $54 61 7A
Under�round Sewer Ft Water Or 250 Of Boom (includ�ng Jib
W�th Attachments)
K�tsap Power Equ�pment Operators- Cranes 45 Tons Through 99 $53 49 7A
UnderQround Sewer Ft Water Tons, Under 150 Of Boom
(mclud�ng J�b With
Attachments)
K�tsap Power Equipment Operato�s Cranes A-frame - 10 Tons And $50 22 7A
Under�round Sewer 8 Water Under
Kitsap Power Equipment Operators Cranes Frut�on 100 Tons $54 61 7A
Underg�oun�Sewer �t Water Through 199 Tons
K�tsap Power Equipment Operators- Cranes Frut�on Over 200 Tons $55 17 7A
Undergraund Sewer � Water
K�tsap Power Equipment Operators Cranes Over 300 Tons Or 300 $55 17 7A
Unders�ound Sewer & Water Of Boom (includmg Jib With
Attachments)
Kitsap Power Equ�pment Operators- Cranes Through 19 Tons With $52 58 7A
UnderQround Sewer �t Water Attachments A-frame Over 10
Tons
Kitsap Power Equipment Operators- Crusher � $53 00 7A
UnderQround Sewer Ft Water
Kitsap Power Equ�pment Operators- Deck Engmeer/deck Winches $53 00 7A
Underground Sewer £x Water (power)
Kitsap Power Equipment Operators- Derncks, On Building Work $53 49 7A
Underground Sewer 8 Water
Kitsap Power Equ�pment Operators- Dozers D-9 Et Under $52 58 7A
Undereround Sewer &t Water
Kitsap Power Equ�ment O�erators- Dr�ll Oilers Auger Type, Truck $52 58 7A
Under�round Sewer 8 Water Or Crane Mount
Kitsap Power Eauipment Ope� ors- Dr�lling Mach�ne $53 00 7A
UnderQround Sewer £t Water
Kitsap Power Eauinment Operators- Etevator And Man-lift $50 22 �
Underground Sewer £t Water Permanent And Shaft Type
K�tsap PQvyer Enu�pment Operators- Firosh�ng Machine, B�dwell Md $53 00 ]9
https //fortress wa gov/lm/wagelookup/prvWagelookup aspx
Page 11 of 17
3C
3C
8P
8P
3C � 8P
3C
3C
3C
8P
8P
8P
3C � 8P
3C
3C
3C
3C
3C
SP
8P
8P
8P
8P
3C
3C
3C
3C
3C
3C
3C
�
�4
8P
8P
8P
8P
8P
8P
8P
�
$P
9/13/2013
Page 12 of 17
Kttsap Power
Under+
Kitsap Power
Under�
K�tsap Power
Under�
Kitsap Power
Unders
K�tsap Power
� Gamaco £t S�milar Equipment
_ Forkl�ft 3000 Lbs And Over $52 58 7A
- With Attachments
_ Forkl�fts Under 3000 Lbs With $50 22 7A
� Attachments
_ Grade Engmeer Using Blue $53 00 7A
� Pnnts, Cut Sheets, Etc
_ Gradechecker/stakeman $50 22 7A
: Guardra�l Punch $53 00 7A
3C
3C
3C
3C
3C
3C
8P
8P
8P
8P
8P
8P
Underqround Sewer Et Water
K�tsap Power Equipment Operatars- Hard Ta�l End Dump $53 49 7A
Under�round Sewer 6t Water Articutatmg Off- Road
Equipment 45 Yards & Over
Kitsap Power Equipment Operators Hard Tail End Dump $53 00 7A
UnderQround Sewer & Water Articulating Off-road
Equipment Under 45 Yards
K�tsap Power EQUipment Operators- Honzontal/d�rectional Dnll $52 58 7A
Unde�ground Sewer tx Water Locator
Kitsap Power Equ�pment Operators- Honzontal/d�rectional Dr�ll $53 00 7A
Underground Sewer �t Water Operator
Kitsap Fower Equ�pment Operators- Hydralifts/boom Trucks Over $52 58 7A
Underground Sewer �t Water 10 Tons
Kitsap Power Equ�pment O�erators- Hydralifts/boom Trucks, 10 $50 22 7A
Under�round Sewer Ft Water Tons And Under
Kitsap Power Eq,u��ment Operators- Loader, Overhead 8 Yards �t $54 04 7A
Underground Sewer £t Water Over
Kitsap Power Equ�pment Operators- Loader, Overhead, 6 Yards But $53 49 7A
Under�round Sewer £t Water Not Includ�ng 8 Yards
Kitsap Power Equipment Operators- Loaders, Overhead Under 6 $53 00 7A
Under�round Sewer F� Water Yards
K�tsap Power Equ�oment Or�erators- Loaders, Plant Feed $53 00 7A
Under�round Sewer Ft Water
Kitsap Power Eau�oment Operators- Loaders Elevating Type Belt $52 58 7A
Under�round Sewer Ec Water
Krtsap Power Equ�pment Operators- Locomofives, All $53 00 7A
Under$round Sewer � Water
K�tsap Povyer Eauipment Operators- Matenal Transfer Dev�ce $53 00 7A
Under�round Sewer & Water
Kitsap Power Equi�ment Operators- Mechamcs, All (leadmen - $54 04 7A
Underground Sewer £t Water $0 50 Per Hour Over Mechamc)
K�tsap Power Equ�pment Operators- Motor Patrol Grader - Non- $52 58 7A
Under$round Sewer �t Water fimsh�ng
Kitsap Power Equipment Operators- Motor Patrol Graders, Fimsh�ng $53 49 7A
Under�round Sewer F� Water
Kitsap Power Equipment Operators- Muckmg Mach�ne, Mole, Tunnel $53 49 7A
Undereround Sewer & Water Dnll, Bonng, Road Header
And/or Sh�eld
Kitsap Power Equipment Operators- Oil Distnbutors, Blower $50 22 7A
UnderQround Sewer t� Water D�stnbution Et Mutch Seeding
3C
3C
3C
3C
3C
�
3C
3C
�
3C
3C
3C
3C
3C
�
3C
3C
8P
8P
8P
8P
8P
8P
8P
8P
8P
�
$�
�
8P
8P
$�
8P
8P
https //fortress wa gov/lm/wagelookup/prvWagelookup aspx 9/13/2013
�
�
�
�
�
'
�
�
�
�
�
�
�
�
'
�
�
�
�
Kitsap
K�tsap
Kitsap
Kitsap
Kitsap
Operator
ent Operators Outside Hoists (elevators And
�ewer & Water Manl�fts), Air Tuggers,strato
ent Operators- Overhead, Bridge Type Crane
�ewer �t Water 20 Tons Through 44 Tons
ent Operators- Overhead, Bridge Type 100
ewer Ft Water Tons And Over
ent Operators- Overhead, Bridge Type 45
ewer £t Water Tons Through 99 Tons
ent Operators- Pavement Breaker
Kitsap Power Ectu�pment Operators- Pile Dnver (other Than Crane
Under�round Sewer 8 Water Mount)
Kitsap Power Equ�pment Operators- Ptant O�ler - Asphalt, Crusher
tJnder�round Sewer 8 �/ater
K�tsap Power Equ�pment Operators- Posthole Digger, Mecharncal
Under�round Sewer £t WateT
K�tsap Power EQUipment Operators- Power Plant
Underground Sewer £t Water
Kitsap Pawer Ectuipment Operators- Pumps - Water
Underground Sewer & Water
K�tsap Power Equ�pment Operators- Quad 9, Hd 41, D10 And Over
Under$round Sewer �t Water
K�tsap Power Equipment Operators- Quuk Tower - No Cab, Under
UnderQround Sewer Ft Water 100 Feet In Height Based To
Boom
Kitsap Power Equipment Operators- Remote Control Operator On
Underground Sewer £t Water Rubber Tired Earth Moving
Equ�pment
$52 58 7A
$53 00 7A
$54 04 7A
$53 49 7A
$50 22 7A
$53 00 7A
$52 58 7A
$50 22 7A
$50 22 7A
$50 22 7A
$53 49 7A
$50 22 �
$53 49� 7A
Kitsap Power Equipment Operators- Rigger And Bellman $50 22 7A
UnderQround Sewer & Water
K�tsap Power Eouioment Operatars- Rollagon $53 49 7A
Under$round Sewer 8 Water
K�tsap Power Eau�pment Ooerators- Roller, Other Than Plant M�x $50 22 �
UnderQround Sewer �t Water
Kitsap Power Equ�pment Operators- Roller, Plant Mix Or Muttrlift $52 58 �
UnderQround Sewer & Water Matenals
K�tsap Power Equrpment Operators- Roto-mill, Roto-gnnder $53 00 7�
Kitsap
Kitsap
K�tsap
Kitsap
Kitsap
Ki tsap
ent
Water
ratars- Saws - Concrete $52 58 7A
Water
rators- Scraper, Self Propelled Under $53 00 7A
Water 45 Yards
r rs- Scrapers - Concrete tt Carry All $52 58 �Qi
Water
rators- Scrapers, Self-propelled 45 $53 49 7A
Water Yards And Over
�ators- Sernce Engmeers - Equipment $52 58 7A
Water
�ators- Shotcrete/gunrte Equipment $50 22 7A
https //fortress wa gov/lm/wagelookup/prvWagelookup aspx
Page 13 of 17
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
3C
�
3C
3C
�
3C
3C
3C
3C
8P
8P
8P
8P
8P
8P
8P
8P
8P
8P
8P
8P
8P
8P
8P
�
$�
�
8P
�
$�.
8P
8P
8P
9/13/2013
�`
Page 14 of 17
Kitsap Power Equipment O_perators Shovel , Excavator, Backhoe, $52 58 7A
Underground Sewer Ft Water Tractors Under 15 Metnc Tons
K�tsap Power Equipment Operators- Shovel, Excavator, Backhoe $53 49 7A
Under�round Sewer Ft Water Over 30 Metrtc Tons To 50
Metr�c Tons
K�tsap Power Ec�u�pment Operators- Shovel, Excavator, Backhoes, $53 00 7Q
Under�round Sewer £t Water Tractors 15 To 30 Metric Tons
Kitsap Power Equ�ament Operators- Shovet, Excavator, Backhoes $54 04 7A
Undereround Sewer & Water Over 50 Metric Tons To 90
Metnc Tons
K�tsap Power Equipment Operators- Shovel, Excavator, Backhoes $54 61 7A
Under�round Sewer & Water Over 90 Metric Tons
Kitsap Power Equ�pment �peratars- Slipform Pavers $53 49 7A
Under�round Sewer & Water
K�tsap Power Eciu�pment Operators- Spreader, Topsider £t $53 49 7A
Underground Sewer �x Water Screedman
K�tsap Power Equ�pment Operators- Subgrader Tnmmer $53 00 7A
Under�round Sewer �t Water
K�tsap Power Equ�pment Operators- Tower Bucket Elevators $52 58 7A
Under�round Sewer �t Water
Kitsap Power Equ�pment Operators- Tower Crane Over 175 �n $54 61 7A
Undereround Sewer & Water Height, Base To Boom
Kitsap Power Equi�ment Operators- Tower Crane Up To 175 In $54 04 7A
UnderQround Sewer £t Water He�ght Base To Boom
Kitsap Power Equapment Operators- Transporters, Att Track Or $53 49 7A
Under�round Sewer £t Water Truck Type
Kitsap Power Ec�u,pment Operators- Trench�ng Machines $52 58 7A
Under�round Sewer tt Water
Kitsap Power Equioment Operators- Truck Crane Oiler/dr�ver - 100 $53 00 7A
Kitsap Power Equ�pment operator
Undereround Sewer Ft Wate
K�tsap Power Eau�pment Operator
Undereraund Sewer £t Wate
Kitsap Power Equipment 0 e� rator
UnderQround Sewer �t Wate
Kitsap Power Egu�pment Ooerator
Under�raund Sewer Ft WatE
Kitsap Power Equipment Operator
Under�round Sewer Ft Wate
Kitsap Power Lme Ctearance Tree
Trimmers
K�tsap Power �me Clearance Tre�
Tr�mmers
K�tsap Power Line Clearance Tree
Trimmers
K�tsap Power Lme Clearance Tree
Tr�mmers
K�tsap Power Lme Ctearance Tree
l rucK (.rane U�terianver unaer �SC 5n iA
100 Tons
Truck Mount Portabte Conveyor $53 00 7A
Welder $53 49 7A
Wheel Tractors, Farmall Type $50 22 �
Yo Yo Pay Dozer $53 00 7A
Journey Level In Charge $43 76 5A
Spray Person $41 51 5A
Tree Equipment Operator $43 76 5A
Tree Tr�mmer $39 10 5A
Tree Tr�mmer Groundperson $29 44 5A
3C 8P
3C 8P
3C $,Q
3C 8P
3C
3C
3C
3C
3C
3C
�
3C
3C
3C
3C
3C
3C
3C
3C
4A
4A
4A
4A
4A
8P
8P
8P
8P
8P
8P
8P
8P
�
8P
8P
�
8P
�
8P
https //fortress wa gov/lnt/wagelookup/prvWagelookup aspx 9/13/2013
�
�
�
�
'
1
�
�
�
�
,
�
�
�
,
'
�
�
�
Kitsap Refn�erat�on & A�r Mecharnc
Cond�t�omn� Mecharncs
Kitsap Resident�al Br�ck Mason Journey Levet
Kitsap Res�dent�al Carpenters Joumey Level
Kitsap Res�dentaal Cement Masons Journey Level
Kitsap Res�dent�al Drvwalt Applicators Journey Level
Kitsap Res�dential Drywatl Tapers Journey Level
Kitsap Residential Electnaans Journey Level
K�tsap Resident�al Glaz�ers Journey Level
Krtsap Res�dential Insulat�on Journey Level
Appticators
K�tsap Resrdenttiat Laborers Journey Level
Kitsap Residentiat Marbte Setters Journey Level
K�tsap Res�dential Pamters Journey Level
Kitsap Resident�at Plumbers �t Journey Level
Pipefitters
Krtsap Residential RefnQeration & Air Journey Level
Cond�t�ornng Mechanics
Kitsap Residential Sheet Metal Journey Level (Field or Shop)
Workers
Kitsap Residential Soft Ftoor Layers Journey Level
Kitsap Residenhat Spnnkter F�tters Journey Level
lF�re Protectionl
Kitsap Resident�at Stone Masons Journey Level
K�tsap Resident�al Terrazza Workers Journey Level
Kitsap Res�dentiat Terrazzo/Tile Journey Level
F�rnshers
Kitsap Residentiat T�le Setters Journey Level
K�tsap RoQfers Journey Level
Kitsap Roofers Usmg Irritable Bituminous
Matenals
Kitsap Sheet Metat Workers Journey Level (F�eld or Shop)
Krtsap 5h�pbuildina Ft Sh�p Repair CARPENTER
Kitsap Sh�pbu�tdinQ Ft Ship Repa�r ELECTRICIAN
Kitsap Sh�obuitdin� &t Sh��Repair Heat �t Frost Insulator
Kitsap Shipbu�td�nu £x Sh�p Repa�r Laborer
Kitsap Shipbuitdm�, 8 Sh� Re�air MACHINIST
Kitsap Shipbu�tdmQ �t Ship Repa�r OPERATOR
Kitsap �h�pbu�tdina & Ship Repa�r Painter
K�tsap �h�pbu�td�ng �Sh�p i�pair PIPEFITTER
Krtsap Shipbuitdin$ 8 Ship Repa�r RIGGER
Kitsap Shipbu�ldin� £t Sh�p Re a�ir Sheet Metal
Kitsap Sh�pbu�tdin�_ft_Sh�p Repair SHIPFITTER
Kitsap 5h�obu�ld�ng 8 Ship Repa�r WELDER/BURNER
K�tsap Si�n Makers �Z Instatlers Journey Level
https //fortress wa gov/lm/wagelookup/prvWagelookup aspx
$61 57 5A
$17 04
$39 62 5Q
$30 87
$39 62 5D
$20 00
$27 00
$53 76 7L
$13 96
$16 89
$17 04
$19 52
$21 11
$17 64
$28 95
$19 38
$27 74
$50 12 5A
$9 19
$30 26
$31 14
$44 21 5A
$47 21 5A
$69 37 7F
$19 29
$25 53
$58 93 ,�1
$19 64
$19 29
$19 44
$36 64 (�,Z
$19 29
$19 29
$22 21
$19 29
$19 29
$20 58
Page 15 of 17
1G
1
1M
1M
1
1
1Y
1
1
1
1
1
1
1
1M
1
1
1
�
1R
1E
1
1
15
1
1
T
1
1
1
9/13/2013
Page 16 of 17
K�tsap S�Qn Makers & Instatlers (Non- Journey Level $9 27
Electrical)
K�tsap Soft Floor Layers Journey Level $42 15 5A
Kitsap Solar Controls For Windows Journey Level $10 31
K�tsap Spr�nkler F�tters {F�re Journey Level $69 59 5C
Protect�onl
K�tsap Sta�e R����n� Mechamcs tNon Journey Level $13 23
Structurall
Kitsap Stone Masons Journey Levet $50 12 5A
Kitsap Street And Park�ng Lot Journey Level $16 00
Sweeper Workers
Kitsap Surveyors Ass�stant Construction Site $52 58 7A
Surveyor
Kitsap Surveyors Chainman $52 06 7A
K�tsap Surveyors Construction S�te Surveyor $53 49 7A
Kitsap Telecommumcation Journey Level $39 57 7E
Techmcians
Kitsap Telephone Lme Construct�on - Cable Splicer $36 01 5A
Outside
Kitsap Tetephone Lme Construction - Hole Digger/Ground Person $20 05 �
Outs�de
Kitsap Telephone Lme Construct�on - Installer (Repairer) $34 50 5A
Outs�de
Kitsap Tetephone Lme Construction - Speaal Aparatus fnstaller I $36 01 5A
Outsrde
Kitsap Tetephone L�ne Canstruction - Speaal Apparatus Installer 11 $35 27 5A
Outs�de
Kitsap Telephone L�ne Construcfi�on - Telephone Equipment Operator $36 01 5A
Outs�de (Heavy)
Kitsap Telephone L�ne Const�uction - Telephone Equipment Operator $33 47 5A
Outsade (Light)
Kitsap Telephone L�ne Construction - Telephone Lineperson $33 47 5A
Outs�de
K�tsap Telephone L�ne Construction - Televis�on Groundperson $19 04 5A
Outs�de
Kitsap Tetephone L�ne Construct�on - Television Lineperson/Installer $25 27 SA
Outs�de
Kitsap Telephone Line Construction - Television System Techmcian $30 20 5A
Outs�de
K�tsap Telephone L�ne Construct�on - Telev�sion Techmc�an $27 09 SA
Outs�de
Kitsap Telephone L�ne Construction - Tree Tnmmer $33 47 5A
Outside
K�tsap Terrazzo Workers Journey Level $46 96 �A
Kitsap Tile Setters Journey Level $46 96 5A
K�tsap T�le. Marbte �t Terrazzo Journey Level $12 00
F�mshers
K�tsap Traffu Cantrot Stnpers Journey Level $42 33 �
1
1
1X
1
1
3C
3C
3C
1E
2B
26
2B
26
2B
26
26
2B
26
2B
26
2B
26
1M
8P
8P
8P
1
L
https //fortress wa gov/lru/wagelookup/prvWagelookup aspx 9/13/2013
,
'
�
�
'
�
�
�
�
i
1
1
1
1
1
1
�
1
1
Kitsap Truck Dnvers Asphalt Mix Over 16 Yards (W
WA-Joint Council 28)
K�tsap Truck Dnvers Asphalt M�x To 16 Yards (W
WA-Jomt Council 28)
K�tsap Truck Dr�vers Dump Truck
K�tsap Truck Dnvers Dump Truck And Trailer
K�tsap Truck Dnvers Other Trucks
K�tsap Truck Drivers Trans�t M�xer
K�tsap Well Dr�lters 8 Irragation Pumg Irngation Pump Installer
instatters
Kitsap Wetl Drilters £t Irn�at�on Pump Oiler
lnstatters
Kitsap Wetl Drillers F� Irra�ation Pum� Well Dnller
lnstalters
https //fortress wa gov/lm/wagelookup/prvWagelookup aspx
$47 91
$47 07
$19 60
$19 b0
$18 37
$20 79
$13 17
$14 08
$14 40I
Page 17 of 17
5D 3�4 8L
5D 3A 8L
1
1
1
1
1
1
9/13/2013
'
Washington State Department of Labor and Industries
Pol�cy Statement
(Regard�ng the Production of "Standard" or "Non-standard" Items)
Below is the department's (State L&I's) I�st of critena to be used in determming whether a
prefabricated item is "standard" or "non-standard" For items not appeanng on
WSDOT's predetermined list, these criteria shall be used by the Contractor (and the
Contractor's subcontractors, agents to subcontractors, suppliers, manufacturers, and
fabricators) to determme coverage under RCW 39 12 The production, in the State of
Washmgton, of non-standard items is covered by RCW 39 12, and the production of
standard items is not The production of any item outside the State of Washmgton is not
covered by RCW 39 12
1 Is the item fabncated for a public works pro�ect� If not, it is not sub�ect to RCW
39 12 If it is, go to question 2
2 Is the item fabncated on the public works �obsite� If it is, the work is covered under
RCW 39 12 If not, go to question 3
3 Is the item fabricated in an assembly/fabrication plant set up for, and dedicated
primar�ly to, the public works pro�ect� If it is, the work is covered by RCW 39 12 If not,
go to question 4
4 Does the item require any assembly, cuttmg, modification or other fabncation by the
supplier� If not, the work is not covered by RCW 39 12 If yes, go to question 5
5 Is the prefabricated item mtended for the public works pro�ect typically an inventory
item which could reasonably be sold on the general market? If not, the work is covered
by RCW 39 12 If yes, go to question 6
6 Does the specific prefabricated item, generally defined as standard, have any
unusual charactenstics such as shape, type of material, strength reqwrements, finish,
etc? If yes, the work is covered under RCW 39 12
Any firm with questions regarding the policy, WSDOT's Predetermined List, or for
determinations of covered and non-covered workers shall be directed to State L&I at
(360) 902-5330
Supplementai to Wage Rates
08/31/2013 Edit�on, Published August 1st, 2013
�
,
�
�
'
�
�
r�
`
u
�
�
�
,
�
'
'
LI
�
�
�
�J
, WSDOT's
Predetermined L�st for
Suppiiers - Manufactures - Fabricator
'
�
�
'
Below �s a list of potentially prefabncated items, ongmally furnished by WSDOT to
Washington State Department of Labor and Industries, that may be considered non-
standard and therefore covered by the prevading wage law, RCW 39 12 Items marked
w�th an X in the "YES" column should be considered to be non-standard and therefore
covered by RCW 3912 Items marked with an X m the "NO" column should be
considered to be standard and therefore not covered Of course, exceptions to this
general list may occur, and in that case shall be evaluated accordmg to the cntena
described m State and L&i's policy statement
ITEM DESCRIPTfON YES NO
� � Metal rectangular frames, solid metal covers, herrmgbone grates, �
and brdirectional vaned grates for Catch Basin �
� Types 1, 1 L, 1 P, and 2 and Concrete I nlets See Std Plans i
f 1--
2 Metal circular frames (rings) and covers, circular grates,
and prefabricated ladders for Manhole Types 1, 2, and 3, � ; �
, Drywell Types 1, 2, and 3 and Catch Basm Type 2
See Std Plans _ I _�_ _ ___
3 Prefabricated steel grate supports and weided grates, ; �
, metal frames and dual vaned grates, and Type 1, 2, and ; � �
3 structural tubing grates for Drop Inlets See Std Plans � I
'
'
,
lJ
�
'
�
'
4 Concrete Pipe - Plain Concrete pipe and reinforced
concrete pipe Class 2 to 5 sizes smaller than 60 inch diameter
5 Concrete P�pe - Plain Concrete pipe and reinforced
concrete pipe Class 2 to 5 sizes larger than 60 inch diameter
6 Corrugated Steel Pipe - Steel lock seam corrugated
pipe for culverts and storm sewers, sizes 30 inch
to 120 inches in diameter May also be treated, 1 thru 5
7 Corrugated Aluminum Pipe - Aluminum lock seam corrugated pipe r
for culverts and storm sewers, s4zes 30 �nch to 120 �nches in
diameter May also be treated, #5 i
Supplemental to Wage Rates
08/31/2013 Edition, Published August 1st, 2013
�
X
� X
r
i �
�
_ _I
2
�
ITEM DESCRIPTION
YES NO
8 Anchor Bolts & Nuts - Anchor Bolts and Nuts, for
mountmg sign structures, luminanes and other items, shall be �
made from commercial bolt stock
See Contract Plans and Std Plans for size and material type �
9 Aluminum Pedestrian Handrad - Pedestrian handrad
conformmg to the type and material specifications set forth in the i
contract plans Welding of aluminum shall be ;
�n accordance with Section 9-28 14(3)
10 Ma�or Structural Steel Fabrication - Fabrication of major steel
�tems such as trusses, beams, girders, etc , for bridges �
11 Minor Structural Steel Fabrication - Fabrication of minor steel I
Items such as speciai hangers, brackets, access doors for '
structures, access ladders for irrigation boxes, bridge expansion �
�oint systems, etc , involving welding, cutting, punch�ng and/or �
boring of holes See Contact Plans for item description and shop
drawings
12 Aluminum Bridge Railing Type BP - Metal bridge rading �-�
conforming to the type and material specifications set forth �
in the Contract Plans Welding of aluminum shall be in `
accordance with Section 9-28 14(3)
13 Concrete Piling--Precast-Prestressed concrete pdmg for use as 55 �
and 70 ton concrete piling Concrete to conform to
�
�
_, _ _
i
X I
X
�
I
� I
�
�f
Section 9-19 1 of Std Spec ; X
a
14 Precast Manhole Types 1, 2, and 3 with cones, ad�ustment �
sections and flat top slabs See Std Plans �
;
15 Precast Drywell Types 1, 2, and with cones and ad�ustment ��
�.�
Sections � �
See Std Plans ;
- --�---___- - -- -
16 Precast Catch Basin - Catch Basin type 1, 1 L, 1 P, and 2 �
With ad�ustment sections See Std Plans � �(
Supplemental to Wage Rates
08/31/2013 Edition, Published August 1st, 2013
3
'
LJ
'
'
'
�
�
�
,
'
'
�
��
'
'
�
'
�
ITEM DESCRIPTION YES NO
17 Precast Concrete Inlet - with ad�ustment sections,
See Std Plans
18 Precast Drop Inlet Type 1 and 2 with metal grate supports
See Std Plans
� �
�
i
i _ _
�
�
X
�
X
19 Precast Grate Inlet Type 2 w�th extension and top urnts �
See Std Plans
- - - -; -- -
20 Metal frames, vaned grates, and hoods for Combination ,
Inlets See Std Plans i
21 Precast Concrete Utdity Vaults - Precast Concrete utility vaults of -�
various sizes Used for m ground storage of utdity facilities and ,
controls See Contract Plans for size and construction
requirements Shop drawings are to be provided for approval
prior to casting
22 Vault Risers - For use with Valve Vaults and Utilities �;
Vaults
�
23 Valve Vault - For use with underground utilities ±��
See Contract Plans for details
24 Precast Concrete Barner - Precast Concrete Barrier for �
use as new barrier or may also be used as Temporary Concrete �
Barner Only new state approved barrier may be used as ,
permanent barner j
25 Reinforced Earth Wali Panels — Reinforced Earth Wali Panels in
size and shape as shown in the Plans Fabrication plant has �
annual approval for methods and materials to be used ,
See Shop Drawing � �(
Fabncation at other locations may be approved, after facilities
inspection, contact HQ Lab i
26 Precast Concrete Walls - Precast Concrete Walls - tdt-up wall � }
panel in size and shape as shown in Plans ; �
Fabricat�on plant has annual approval for methods and materials �
_to be used _ _ __ _ _ _ __ �
Supplemental to Wage Rates
08/31/2013 Edit�on, Published August 1st, 2013
X
_�
X
4
,
ITEM DESCRIPTION YES NO
27 Precast Radroad Crossings - Concrete Crossmg Structure �
Slabs _
28 12, 18 and 26 mch Standard Precast Prestressed Girder - T ` — t -
Standard Precast Prestressed Girder for use in structures � I
Fabricator plant has annual approval of inethods and materials to
be used Shop Drawing to be provided for approval prior to ,
castmg girders '
See Std Spec Section 6-02 3(25)A — —
2g Prestressed Concrete Series 4-14 - Prestressed Concrete
Girders for use in structures Fabricator plant has annual approval �
of inethods and materials to be used Shop Drawmg to be
provided for approval prior to casting girders !
See Std Spec Section 6-02 3(25)A �
30 Prestressed TrrBeam Girder - Prestressed Tri-Beam Girders for
use in structures Fabricator plant has annual approval of
methods and matenals to be used Shop Drawing to be provided
for approval pnor to casting girders
See Std Spec Section 6-02 3(25)A
�
31 Prestressed Precast Hollow-Core Slab – Precast Prestressed ---T-
Hollow-core slab for use in structures Fabricator plant has annual
approval of inethods and materials to be used Shop Drawing to
be provided for approval prior to casting girders
See Std Spec Section 6-02 3(25)A
32 Prestressed-Bulb Tee Girder - Bulb Tee Prestressed Girder for �
use in structures Fabricator plant has annual approval of �
methods and materials to be used Shop Drawing to be provided `
for approval prior to casting girders
�
See Std Spec Section 6-02 3(25)A
33 Monument Case and Cover
See Std Plan
Supplemental to Wage Rates
08/31/2013 Edition, Published August 1st, 2013
� �
- -- -- �
�
� �
i
�
1
�
X ,
I
i
� '
�
I
- f
�'�
�
5
,
,
'
,
L�
�
�
� �
,
i
�
'
l�
'
�
IJ
,
'
ITEM DESCRIPTION YES NO
34 Cantdever Sign Structure - Cantdever Sign Structure
fabrticated from steef tubing meeting AASHTO-M-183 See Std
Plans, and Contract Plans for details The steel structure �
shall be galvanized after fabrication in accordance with �
AASHTO-M-111 �
35 Mono-tube Sign Structures - Mono-tube Sign Bndge '
fabricated to detads shown in the Plans Shop drawings for
approval are required prior to fabrication ;
- -- - E
36 Steel Sign Bndges - Steel Sign Bndges fabricated from steel ,
tubing meeting AASHTO-M-138 for Alummum Alloys i
See Std Plans, and Contract Plans for detads The steel �
structure ,
shall be galvanized after fabrication in accordance f
with AASHTO-M-111 �
�
1�
37 Steel Sign Post - Fabncated Steel Sign Posts as detaded m Std
Ptans Shop drawings for approva! are to be provided prior to
fabrication __ ______ __ _
38 Light Standard-Prestressed - Spun, prestressed, hollow
concrete poles , �
39
40
41
�ignt 5tanaaras - ugnting 5tanaaras tor use on hignway �
illummation systems, poles to be fabricated to conform with
methods and matenals as specified on Std Plans See Specia �
Provisions for pre-approved drawings ;
- - -- �
Traffic Signal Standards - Traffic Signal Standards for use on j
highway and/or street signal systems Standards to be fabricated �
to conform with methods and matenal as specified on Std Plans
See Special Provisions for pre-approved drawmgs
Precast Concrete Sloped Mountable Curb (Single and DualFaced)
See Std Plans
Suppiemental to Wage Rates
08l31 /2013 Ed�tion, Pubf�shed August 1 st, 2013
f��
�
� �
i
� �
�
,
ITEM DESCRIPTION YES NO
42 Traffic Signs - Prior to approval of a Fabricator of Traffic Signs, '
the sources of the followmg materials must be submitted and
approved for reflect�ve sheeting, legend material, and aluminum
sheetmg I
NOTE *** Fabrication inspection required Only signs tagged
"Fabrication Approved" by WSDOT Sign Fabrication Inspector to
X � X
I
be installed _ __ _ ___ __ � _ i _
' custom � sta
f Message Signing
� Messa�e
43 Cuttmg & bending reinforcing steel � I �
�
44 Guardrad components � �( � x
i Custom I Standard
End Sec Sec
- - - - - - -- -- -�-_ _ _ _
45 Aggregates/Concrete mixes � Covered by
WAC 296-127-018
46 Asphalt i covered by �
WAC 296-127-018
- ----- - -- - - — --- --- - -- - --- - --- - - - - -- --- i - X- -
47 Fiber fabrics
— — --- - ---- ----- - -- --- -- - -;--_
48 Electrical w�nng/components ' X
- --- ------- -- --- - ----- - - --�-----
49 treated or untreated timber pde � X
� i
50 Girder pads (elastomeric bearing) x I
51 Standard Dimension lumber � �
� �
52 Irrigation components i � �
_ _ _ __ _ ^_ _ _ ___ � � -- - -- -
Supplemental to Wage Rates 7
08/31/2013 Edition, Published August 1st, 2013
�
�
'
�
�
,
�
�
�
�
ITEM DESCRIPTION YES NO
53 Fencing materials
54 Guide Posts � �
55 Traffic Buttons
56 Epoxy
57 Cribbing
58 Water distnbution mater�als
59 Steel "H" pdes � !
60 Steel pipe for concrete pde casings
61 Steel pile tips, standard
62 Steel pde tips, custom
i
, X
- ---- --- -�- � -
--!�
- --- ---- f �
,
t -
--� -- - - - -- � -
, �
�
l
, X
-- -- --- -----� -- �
- - - - - ---- -�---- - -
I �
-- -- ---- - - - - ->-- --
; �
�
-- - -- --G
l�
�
Prefabricated items specifically produced for public works pro�ects that are prefabricated in a
' county other than the county wherein the public works pro�ect is to be completed, the wage for
the offsite prefabrication shatl be the applicable prevading wage for the county in which the actual
prefabrication takes place
' It is the manufacturer of the prefabricated product to verify that the correct county wage rates are
applied to work they perform
' See RCW 39 12 010
(The definition of "local�ty" in RCW 39 12 010(2) contains the phrase wherein the physical work is bemg pertormed " The
department interprets this phrase to mean the actual work site
,
'
�
'
�
Supplemental to Wage Rates
08/31/2013 Edition, Published August 1st, 2013
�
LJ
�
WSDOT's List of State Occupations not applicable to Heavy and
Hsghway Construction Pro�ects
Th�s pro�ect rs sub�ect to the state hourly minimum rates for wages and fringe benefits in
the contract provisions, as provided by the state Department of Labor and Industries
The following list of occupations, is comprised of those occupations that are not normally
used in the construction of heavy and highway pro�ects
When considering �ob classificat�ons for use and / or payment when bidding on, or
buildmg heavy and h�ghway construction pro�ects for, or admmistered by WSDOT, these
Occupations will be excepted from the mcluded "Washington State Prevailing Wage
Rates For Public Work Contracts" documents
• Buddmg Service Employees
• Electrical Fixture Maintenance Workers
• Electricians - Motor Shop
• Heatmg Equipment Mechanics
• Industrial Engme and Machme Mechanics
• Industrial Power Vacuum Cleaners
• Inspect�on, Cleaning, Sealing of Water Systems by Remote Control
• Laborers - Underground Sewer & Water
• Machmists (Hydroelectric Site Work)
• Modular Buddings
• Playground & Park Equipment Installers
� Power Equipment Operators - Underground Sewer & Water
• Residential *** ALL ASSOCIATED RATES ***
a Sign Makers and Installers (Non-Electrical)
• S�gn Makers and Installers (Electncal)
• Stage Rigging Mecharncs (Non Structural)
The following occupations may be used only as outlmed in the preceding text concerning
"WSDOT's list for Suppiiers - Manufacturers - Fabncators"
• Fabncated Precast Concrete Products
+ Metal Fabrication (In Shop)
Defirntions for the Scope of Work for prevadmg wages may be found at the Washmgton
State Department of Labor and Industries web site and in WAC Chapter 296-127
��
,
,
�
�
�
�
�
C
�
t
'
�
LJ
r
'
Supplemental to Wage Rates 9 ,
08/31/2013 Edition, Published August 1st, 2013
CI
'
,
�
�
�
'
�
,
�
'
'
��
�
�
�
,
'
I�
Washington State Department of Labor and Industries
Pol�cy Statements
(Regarding Production and Delrvery of Gravel, Concrete, Asphalt, etc )
WAC 296-127-018 Agency filings affecting this section
Coverage and exempt�ons of workers �nvolved in the production and del�very of
gravel, concrete, asphalt, or s�mdar mater�als
(1) The materials covered under this section include but are not limited to Sand,
gravel, crushed rock, concrete, asphalt, or other similar matenals
(2) All wo�kers, regardless of by whom employed, are sub�ect to the provisions of
chapter 39 12 RCW when they perform any or all of the following funcfions
(a) They deliver or discharge any of the above-listed materials to a pubiic works
pro�ect site
(i) At one or more point(s) directly upon the location where the material wdl be
mcorporated into the pro�ect, or
(n) At multiple pomts at the pro�ect, or
(ui) Ad�acent to the location and coo�dmated with the incorporation of those matenals
(b) They wait at or near a public works pro�ect site to perform any tasks sub�ect to this
section of the rule
(c) They remove any matenais from a public works construct�on site pursuant to
contract requirements or specifications (e g, excavated materials, materials from
demolished structures, clean-up materials, etc )
(d) They work m a materials production facility (e g, batch plant, borrow pit, rock
quarry, etc ,) which is established for a pubiic works pro�ect for the specific, but not
necessarily exclusive, purpose of supplying materials for the pro�ect
(e) They deliver concrete to a public works site regardless of the method of
incorporation
(fl They assist or participate in the incorporation of any materials into the public works
pro�ect
Supplemental to Wage Rates 10
08/31/2013 Edition, Published August 1st, 2013
�
�
(3) All travel time that relates to the work covered under subsection (2) of this section
requires the payment of prevailing wages Travel time mcludes time spent waiting to
load, loading, transporting, waiting to unload, and delivering materials Travel time would
include all time spent in travel in support of a public works pro�ect whether the vehicle is
empty or full For example, travel time spent returning to a supply source to obtam
another load of material for use on a public works site or returning to the public works
site to obtain another load of excavated material is time spent m travel that is sub�ect to
prevailing wage Travel to a supply source, including travel from a public works site, to
obtain materials for use on a private pro�ect would not be travel sub�ect to the prevading
wage
(4) Workers are not sub�ect to the provisions of chapter 39 12 RCW when they deliver
materials to a stockpde
(a) A"stockpde" is defined as matenals delivered to a pile located away from the site
of incorporation such that the stockpded matenals must be physically moved from the
stockpde and transported to another location on the pro�ect site m order to be
incorporated into the pro�ect
(b) A stockpde does-not mclude any of the functions described m subsection (2)(a)
through (fl of this section, nor does a stockpde include materials delivered or distributed
to multiple locations upon the pro�ect site, nor does a stockpde include materials dumped
at the place of incorporation, or ad�acent to the location and coordinated with the
incorporation
(5) The applicable prevadmg wage rate shall be determined by the locality in which
the work is performed Workers sub�ect to subse�t�on (2)(d) of this section, who produce
such matenals at an off-site facd�ty shall be paid the applicable prevading wage rates for
the county m which the off-site facdity �s located Workers sub�ect to subsection (2) of
this section, who del�ver such materials to a public works pro�ect site shall be paid the
applicable prevading wage rates for the county in which the pubiic works pro�ect is
located
[Statutory Authonty Chapter 39 12 RCW, RCW 43 22 051 and 43 22 270 08-24-101, §
296-127-018, filed 12i2/08, effective 1/2/09 Statutory Authority Chapters 39 04 and
39 12 RCW and RCW 43 22 270 92-01-104 and 92-08-101, § 296-127-018, filed
12/18/91 and 4/1/92, effective 8/31/92 ]
Supplemental to Wage Rates 11
08/31/2013 Ed�tion, Published August 1st, 2013
'
�
II
�
�
u
��
�
�
�
�
�
�
I
�
LJ
�.l
,
1
'
�J
'
n
L�
�'
�
�
�J
'
�
I�
LJ
'
Benefit Code Key — Effect�ve 8-31-2013 thru 3-4-2014
�***�***********«.****�************�***�***«+*�*��***�*******�**********�************#********:********�****
Overhme Codes
Overtime calculations are based on the hourly rate actually pa�d to the worker On publ►c works pro�ects, the hourly rate
must be not less than the preva�lmg rate of wage mmus the hourly rate of the cost of fr�nge benefits actually provided for
the worker
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER W�EK SHALL
BE PAID AT ONE AND ONE-HALF TiMES THE HOURLY RATE OF WAGE
B All hours worked on Saturdays shall be paid at one and one-half t�mes the hourly rate of wage Atl hours worked
on Sundays and holidays shall be pa�d at double the hourly rate of wage
C The first two (2) hours after e�ght (8) regular hours Monday through Friday and the first ten (10) hours on Saturday
shall be pa�d at one and one-half t►mes the hourly rate of wage Atf other overttme hours and all hours worked on
Sundays and holidays shall be pa�d at double the hourly rate of wage
D The first two (2) hours before or after a five-eight (8) hour workweek day or a four-ten (10) hour workweek day and
the first eight (8) hours worked the next day after e�ther workweek shall be pa�d at one and one-half times the hourly
rate of wage All addit�onal hours worked and all worked on Sundays and holidays shall be paid at double the hourly
rate of wage
E The first two (2) hours after e�ght (8) regular hours Monday through Fnday and the first eight (8) hours on Saturday
shall be paid at one and one-half t�mes the hourly rate of wage All other hours worked Monday through Saturday,
and all hours worked on Sundays and hol�days shall be paid at double the hourly rate of wage
F The first two (2) hours after eight (8) regular hours Monday through Fr�day and the first ten (10) hours on Saturday
' shall be paid at one and one-half times the hourly rate of wage All other overtime hours worked, except Labor Day,
shall be pa�d at double the hourly rate of wage All hours worked on Labor Day shall be paid at three t�mes the
hourly rate of wage
'
,
��
,
�
l J
'
'
G The first ten (10) hours worked on Saturdays and the first ten (10) hours worked on a fifth calendar weekday m a
four-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage All hours worked in excess
of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be pa�d at
double the hourly rate of wage
H All hours worked on Saturdays (except makeup days if work is lost due to �nclement weather conditions or
equ�pment breakdown) shall be pa�d at one and one-half times the hourly rate of wage All hours worked Monday
through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the
hourly rate of wage
I All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage
J The first two (2) hours after eight (8) regular hours Monday through Fnday and the first ten (10) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage All hours worked over ten (10) hours Monday
through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage
K All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage All
hours worked on hol�days shall be pa�d at double the hourly rate of wage
M All hours worked on Satwdays (except makeup days if work is lost due to �nclement weather cond�tions) shall be
pa�d at one and one-half t�mes the hourly rate of wage All hours worked on Sundays and hoiidays shall be pa�d at
double the hourly rate of wage
'�. J
Benefit Code Key — Effective 8-31-2013 thru 3-4-2014
N All hours worked on Saturdays (except makeup days) shall be pa�d at one and one-half t�mes the hourly rate of
wage All hours worked on Sundays and hol�days shall be paid at double the hourly rate of wage
O The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage All
hours worked on Sundays, holidays and after twelve (12) hours, Monday through Fnday and after ten (10} hours on
Saturday shall be pa�d at double the hourly rate of wage
P All hours worked on Saturdays (except makeup days �f c�rcumstances warrant) and Sundays shall be pa�d at one and
one-half times the hourly rate of wage Ail hours worked on hol�days shall be paid at double the hourly rate of wage
Q The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on
Saturdays shall be pa�d at one and one-half t�mes the hourly rate of wage All hours worked m excess of ten (10)
hours per day Monday through Saturday and all hours worked on Sundays and holidays (except Chr�stmas day) shall
be paid at double the hourly rate of wage All hours worked on Chr�stmas day sha(I be paid at two and one-hatf
t►mes the hourly rate of wage
R All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage
S The first two (2) hours after e�ght (8) regutar hours Monday through Friday and the first eight (8) hours on Saturday
shall be paid at one and one-half t�mes the hourly rate of wage All hours worked on hol�days and all other
overt�me hours worked, except Labor Day, shall be paid at double the hourly rate of wage All hours worked on
Labor Day shall be paid at three ttmes the hourly rate of wage
U All hours worked on Saturdays shall be pa�d at one and one-half t�mes the hourly rate of wage All hours worked on
Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage All hours worked on
Labor Day shall be paid at three times the hourly rate of wage
V All hours worked on Sundays and holidays (except Thanksgrving Day and Christmas day) shall be paid at one and
one-half times the hourly rate of wage All hours worked on Thanksg�v�ng Day and Christmas day shall be pa�d at
double the hourly rate of wage
W All hours worked on Saturdays and Sundays (except make-up days due to conditions beyand the control of the
employer)) shall be pa�d at one and one-half times the hourly rate of wage All hours worked on hol�days shall be
paid at double the hourly rate of wage
X The first four (4) hours after eight (8) regular hours Monday through Fr�day and the first twelve (12) hours on
Saturday shall be paid at one and one-half t�mes the hourly rate of wage All hours worked over twelve (12) hours
Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage When holiday falls
on Saturday or Sunday, the day before Saturday, Fr�day, and the day after Sunday, Monday, shall be considered the
holiday and all work performed shall be paid at double the hourly rate of wage
Y All hours worked outside the hours of 5 00 am and 5 00 pm (or such other hours as may be agreed upon by any
employer and the employee) and all hours worked m excess of e�ght (8) hours per day (10 hours per day for a 4 x 10
workweek) and on Saturdays and hol�days (except labor day) shall be paid at one and one-half t�mes the hourly rate
of wage (except for employees who are absent from work wrthout pr�or approval on a scheduled workday dunng
the workweek shall be pa�d at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10
workweek) or 40 hours durmg that workweek ) All hours worked Monday through Saturday over twelve (12) hours
and all hours worked on Sundays and Labor Day shall be pa�d at double the hourly rate of wage
Z All hours worked on Saturdays and Sundays shall be paid at one and one-half times the howly rate of wage All
hours worked on hol�days shall be paid the stra�ght t�me rate of pay m addition to holcday pay '
'
'
LJ
�
�
'
�
�
'
'
�
1
Benefit Code Key — Effective 8-31-2013 thru 3-4-2014
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL
BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
B All hours worked on holidays shall be pa�d at one and one-half t�mes the hourly rate of wage
C All hours worked on Sundays shall be paid at one and one-half t�mes the hourly rate of wage All hours worked on
hol�days shall be paid at two t�mes the hourly rate of wage
F The first e�ght (8) hours worked on holidays shall be paid at the straight hourly rate of wage m addiUon to the
hol�day pay Ali hours worked m excess of eight (8) hours on holidays shall be paid at double the hourly rate of
wage
G All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on paid holidays
shall be paid at two and one-half times the hourly rate of wage mcludmg holiday pay
H All hours worked on Sunday shall be pa►d at two t�mes the hourly rate of wage All hours worked on holidays shall
be pa�d at one and one-half times the hourly rate of wage
K All hours worked on hol�days shall be pa�d at two times the hourly rate of wage tn addit�on to the holiday pay
O All hours worked on Sundays and hol�days shall be paid at one and one-half times the hourly rate of wage
R All hours worked on Sundays and holidays and all hours worked over si�cty (60) m one week shall be paid at double
the hourly rate of wage
U All hours worked on Saturdays shall be paid at one and one-half t�mes the hourly rate of wage All hours worked
over 12 hours m a day or on Sundays and hol�days shall be pa�d at double the hourly rate of wage
W The first two (2) hours after eight (8) regular hours Monday through Fr�day and the first eight (8) hours on Saturday
' shall be paid at one and one-half times the houriy rate of wage All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage On a four-day,
ten-hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten
, shall be paid at double the hourly rate of wage The first e�ght (8) hours worked on the fifth day shall be pa�d at one
and one-half times the hourly rate of wage All other hours worked on the fifth, s�xth, and seventh days and on
holidays shall be pa�d at double the hourly rate of wage J
,
'
'
�
,
,
'
Y All hours worked on Saturdays (except for make-up days) shall be paid at one and one-half t�mes the hourly rate of
wage All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and
hol�days shall be pa�d at doubie the hourly rate of wage
ALL HOURS WORKED M EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL
BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
A Work performed �n excess of eight (8) hours of straight time per day, or ten (10) hours of stra�ght time per day when four
ten (10) hour shifts are established, or forty (40) hours of stra�ght t�me per week, Monday through Fr�day, or outs�de the
normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate Hours worked over
twelve hours (12) m a s�ngle sh�ft and all work performed after 6 00 pm Saturday to 6 00 am Monday and holidays shall
be pa�d at double the straight time rate of pay Any shift startmg between the hours of 6 00 pm and midn�ght shall
receive an addrtional one dollar ($1 00) per hour for all hours worked that shift The employer shall have the sole
discretion to ass�gn overhme work to employees Pnmary consideration for overtime work shall be given to employees
regularty ass�gned to the work to be performed on overt�me situations After an employee has worked eight (8) hours at
an applicable overtime rate, all additional hours shall be at the applicab(e overtime rate until such t�me as the employee
has had a break of eight (8) hours or more
1
Benefit Code Key — Effective 8-31-2013 thru 3-4-2014
B The first four (4) hours after eight (8) regular hours Monday through Fnday and the first twelve (12) hours on
Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over twelve (12) hours
Monday through Saturday, and all hours worked on Sundays and hol�days shall be paid at double the hourly rate of
wage
C Work performed m excess of e�ght (8) hours of stra�ght time per day, or ten (10) hours of straight t�me per day when
four ten (10) hour shiRs are established, or forty (40) hours of stra�ght time per week, Monday through Fnday, or
outside the normal shift, and all work on Saturdays shall be paid at one and one-hatf t�mes the hourly rate of wage
All work performed after 6 OQ pm Saturday to 5 00 am Monday and Hol�days shall be paid at double the hourly rate
of wage After an employee has worked eight (8) hours at an applicable overt�me rate, all add�t�onal hours shall be at
the applicable overtime rate unt�l such time as the employee has had a break of eight (8) hours or more
D All hours worked between the hours of 6 00 pm and 6 00 am, Monday through Saturday, shall be paid at a prem�um
rate of I S% over the hourly rate of wage All other hours worked after 6 00 am on Saturdays, shall be paid ai one
and one-half times the hourly rate of wage All hours worked on Sundays and hol�days shall be pa�d at double the
hourly rate of wage
E All hours worked Sundays and holidays shall be paid at double the hourly rate of wage Each week, once 40 hours of
straight t�me work is achieved, then any hours worked over 10 hours per day Monday through Saturday shall be pa�d
at double the hourly wage rate
F All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked on
Sunday sha11 be paid at two t�mes the hourly rate of wage All hours worked on pa�d hol�days shall be pa�d at two
and one-half times the hourly rate of wage mcludmg hol�day pay
G Work performed m excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when
four ten (] 0) hour shifts are established, or forty (40) hours of straight time per week, Monday through Fnday, , and
all work on Saturdays shall be pa�d at t�me and one-haif the straight t�me rate Hours worked over twelve hours (12)
m a s�ngle shift and all work performed after 8 00 am Sunday to 8 00 am Monday and Holidays shall be paid at
double the stra�ght t�me rate of pay After an employee has worked e�ght (8) hours at an appl�cable overtime rate, all
addit�onal hours shall be at the applicable overtime rate until such t�me as the employee has had a break of e�ght (8)
hours or more
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL
BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
A All hours worked m excess of e�ght (8) hours per day or forty (40) hours per week shall be paid at double the hourly
rate of wage All hours worked on Saturdays, Sundays and hol�days shall be paid at double the hourly rate of wage
Holidav Codes
A Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgivmg Day, Fr�day after
Thanksgivmg Day, and Chr�stmas Day (7)
B Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Tharilcsgrvmg Day, Friday after
Thanksgivmg Day, the day before Chnstmas, and Chr�stmas Day ($)
C Hol�days New Year's Day, Presidents' Day, Memonal Day, Independence Day, Labor Day, Thanksgiv►ng Day,
the Fnday after Thanksgrv�ng Day, And Chr►stmas Day (8)
D Hol�days New Year's Day, Mernonal Day, Independence Day, Labor Day, Thanksgivmg Day, the Fr�day and
Saturday after Thanksgivmg Day, And Chnstmas Day (8)
4
'
, H
' S I
1
�
'
'
�
1
'
'
,
'
' 6
�
,
'
'
,
J
K
L
N
P
Q
R
S
T
Z
A
E
Ce3
H
Benefit Code Key — Effect�ve 8-31-2013 thru 3-4-2014
Hol�days New Year's Day, Memonal Day, Independence Day, Thanksg�vmg Day, the Day after Thanksgivmg Day,
And Christmas (6)
Holidays New Year's Day, Memor�al Day, Independence Day, Labor Day, Thanksgivmg Day, and Chnstmas Day
(6)
Holidays New Year's Day, Memorial Day, Independence Day, Thanksgiv�ng Day, Friday after Thanksg�v�ng Day,
Chnstmas Eve Day, And Chnstmas Day (7)
Hol�days New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
Friday After Thanksgivmg Day, The Day Before Christmas, And Chnstmas Day (9)
Hol�days New Yeaz's Day, Martm Luther Kmg Jr Day, Memorial Day, Independence Day, Labor Day,
Thanksgivmg Day, Fnday After Thanksg�ving Day, And Christmas Day (8)
Holidays New Year's Day, Pres�dents' Day, Memonal Day, Independence Day, Labor Day, Veterans' Day,
Thanksg�vmg Day, The Friday After Thanksgrv�ng Day, And Chnstmas Day (9)
Hol�days New Year's Day, Memonal Day, Independence Day, Labor Day, Thanksgivmg Day, Enday And Saturday
After Thanksgiv�ng Day, The Day Before Chnstmas, And Christmas Day (9) If A Hol�day Falls On Sunday, The
Follow�ng Monday Shall Be Cons�dered As A Hol�day
Paid Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgrving Day, and Chr�stmas
Day (6)
Pa�d Hol�days New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksg►v�ng Day, Day After
Thanksgrvmg Day, One-Half Day Before Chr►stmas Day, And Christmas Day (7 1/2)
Paid Holidays New Year's Day, Pres�dents' Day, Memorial Day, Independence Day, Labor Day, Thanksg�ving
Day, And Chnstmas Day (7)
Pa�d Holidays New Year's Day, Washmgton's Birthday, Memonal Day, Independence Day, Labor Day,
Thanksgivmg Day, The Fr�day After Thanksgiv�ng Day, Chr�stmas Day, And The Day Before Or After Chnstmas
(9)
Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgivmg Day, the
Fr�day after Thanksg�vmg Day, And Chnstmas Day (8)
Hol�dav Codes Cont�nued
Pa�d Hol�days New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgrv�ng
Day, The Fnday After Thanksg�vmg Day, And Chnstmas Day (8)
Paid Holidays New Year's Day, Day Before Or After New Year's Day, Pres�dents Day, Memorial Day,
Independence Day, Labor Day, Thanksg�ving Day, Day After Thanksg►vmg Day, Chnstmas Day, And A Half-Day
On Christmas Eve Day (9 1/2)
Paid Hol�days New Year's Day, Martm Luther King Jr Day, Pres�dents' Day, Memorial Day, Independence Day,
Labor Day, Veterans' Day, Thanksgivmg Day, The Fnday After Thanksgrvmg Day, Christmas Day, And Christmas
Eve Day (11)
Paid Holidays New Year's Day, New Yeaz's Eve Day, Memonal Day, [ndependence Day, Labor Day,
5
�
4
1
Benefit Code Key — Effective 8-31-2013 thru 3-4-2014
T
Thanksgivmg Day, Friday After Thanksgivmg Day, Christmas Day, The Day After Chnstmas, And A Eloating
Holiday (10)
Pa�d Holidays New Year's Day, Memonal Day, Independence Day, Labor Day, Thanksgiving Day, Fr�day
After Thanksg�ving Day, And Christmas Day (7)
Pa�d Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day,
Thanksg�vmg Day, The Friday After Thanksg�ving Day, The Last Workmg Day Before Chnstmas Day,
And Chr�stmas Day (9)
'
,
�
Z Hol�days New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgrvmg Day, Fr�day after
Thanksgiv�ng Day, And Chr�stmas Day (7) If a holiday falls on Saturday, the preceding Friday shall be
considered as the holiday If a holiday falls on Sunday, the followmg Monday shall be considered as the
holiday
Hohdav Codes Cont�nued
A Holidays New Year's Day, Memor�al Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And
Saturday After Thanksgivmg Day, And Chr�stmas Day (8) Any Hol�day Wh�ch Falls On A Sunday Shall Be
Observed As A Holiday On The Followmg Monday If any of the l�sted holidays falls on a Saturday, the precedmg
Friday shall be a regular work day
B Hol�days New Year's Day, Memor�al Day, Independence Day, Labor Day, Thanksg�v�ng Day, the Friday and
Saturday after Thanksgivmg Day, And Chr�stmas Day (8) Any holiday wh�ch falls on a Sunday shall be observed as
a holiday on the following Monday Any hol�day which falls on a Saturday shall be observed as a hol�day on the
preceding Friday
C Hol�days New Year's Day, Martin Luther Kmg Jr Day, Memorial Day, Independence Day, Labor Day,
Thanksg�vmg Day, The Fr�day After Thanksgiving Day, And Chnstmas Day (8) Any hoLday which falls on a
Sunday shall be observed as a hol�day on the follow�ng Monday Any hol�day which falls on a Saturday shall be
observed as a hol�day on the precedmg Fr�day
D Pa�d Hol�days New Year's Day, Memor�al Day, Independence Day, Labor Day, Veteran's Day, Thanksg�ving
Day, the Friday after Thanksgrvmg Day, And Chnstmas Day (8) Unpa�d Holidays Pres�dent's Day Any paid
holiday which falls on a Sunday shall be observed as a holiday on the follow�ng Monday Any paid holiday wh�ch
falls on a Saturday shall be observed as a holiday on the precedmg Friday
'
1
1
'
1
�
�
'
E Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksg�ving Day, the Friday after
Thanksg►v►ng Day, And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a hol�day on '
the following Monday Any hol�day wh�ch falls on a Saturday shall be observed as a hol�day on the precedmg
Fnday
F Hol�days New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgivmg Day, the Fr�day after
Thanksgivmg Day, the last work�ng day before Christmas day and Chnstmas day (8) Any holiday which falls on a
Sunday shall be observed as a holiday on the following Monday Any hol�day which falls on a Saturday shall be
observed as a hol�day on the preceding Fr�day
G Hol�days New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgivmg Day, and Christmas Day
(6) Any hol�day which falls on a Sunday shall be observed as a hol�day on the following Monday
H Hol�days New Year's Day, Mart�n Luther Kmg Jr Day, Independence Day, Memor�al Day, Labor Day,
Thanksg�vmg Day, the Fnday after Thanksg�ving Day, the Last Work►ng Day before Christmas Day and Chr�stmas
Day (9) Any hol�day which falls on a Sunday shall be observed as a holiday on the followmg Monday Any holiday
wh�ch falls on a Saturday shall be observed as a holiday on the preceding Fnday
6
t
�
'
'
'
�
�
Benefit Code Key — Effective 8-31-2013 thru 3-4-2014
1
�
'
I Hol�days New Year's Day, President's Day, Independence Day, Memonal Day, Labor Day, Thanksgiv�ng Day, The
Fnday After Thanksgtvmg Day, The Day Before Chr�stmas Day And Chr�stmas Day (9) Any holiday wh�ch falls
on a Sunday shall be observed as a holiday on the fotlowing Monday Any hol�day wh�ch fal(s on a Saturday shall
be observed as a holiday on the preceding Fnday
J Hol�days New Year's Day, Independence Day, Memoriat Day, Labor Day, Thanksgiv►ng Day and Chnstmas Day
(6) Any holiday which falls on a Sunday shall be observed as a holiday on the follow�ng Monday Any holiday
which falis on a Saturday shall be observed as a holiday on the preceding Fr�day
K Hol�days New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after
� Thanksgiving Day, And Christmas Day (8) Any hol�day wh�ch falls on a Sunday shall be observed as a holiday on
the following Monday Any holiday which falts on a Saturday shall be observed as a hol�day on the precedmg
Fnday
i
'
�
i �
�
1
�
II
u
�
�
'
L Hol�days New Year's Day, Memor�al Day, Labor Day, Independence Day, Thanksg�ving Day, the Last Work Day
before Chr�stmas Day, And Chrtstmas Day (7) Any holiday whtch falls on a Sunday shall be observed as a holiday
on the followmg Monday Any holiday wh�ch falls on a Saturday shall be observed as a holiday on the preceding
Fnday
M Paid Holidays New Year's Day, The Day after or before New Year's Day, President's Day, Memor�al Day,
Independence Day, Labor Day, Thanksgiv�ng Day, the Fnday after Thanksg�ving Day, Chnstmas Day, And the Day
after or before Christmas Day 10) Any holiday wh�ch falis on a Sunday shall be observed as a holiday on the
follow�ng Monday Any holiday wh�ch falls on a Saturday shall be observed as a hol�day on the precedmg Fnday
N Hol�days New Year's Day, Memor�al Day, Independence Day, Labor Day, Thanksgivmg Day, the Fnday after
Thanksgiving Day, And Chr�stmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on
the followmg Monday When Christmas falls on a Saturday, the precedmg Fr►day shal( be observed as a hol�day
O Paid Hol�days New Year's Day, The Day Aftei Or Before Ne�v Year's Day, Pres�dent's Day, Memorial Day,
Independence Day, Labor Day, Thanksg�vmg Day, The Fr�day After Thanksg�vmg Day, Christmas Day, The Day
After Or Before Christmas Day, And The Employees Birthday 11) Any holiday wh�ch falls on a Sunday shall be
observed as a holiday on the follow►ng Monday Any hol�day which falls on a Saturday shall be observed as a
holiday on the preceding Friday
P Nol�days New Year's Day, Memonal Day, Independence Day, Labor Day, Thanksg�vmg Day, Fr�day after
Thanksgrv�ng Day, And Chr�stmas Day (7) Any hol�day which falis on a Sunday shall be observed as a hol�day on
the following Monday
Q Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Fr�day after
Thanksg�vmg Day, the Last Workmg Day before Christmas Day and Christmas Day (8) Any holiday wh�ch falls on
a Sunday shall be observed as a holiday on the follow�ng Monday If any of the l�sted hol►days falls on a Saturday,
the precedmg Fr�day shall be a regular work day
R Paid Holidays New Year's Day, the day after or before New Year's Day, President's Day, Memorial Day,
Independence Day, Labor Day, Thanksg►v�ng Day, the Fr�day after Thanksgrvmg Day, Christmas Day, and the day
after or before Chr�stmas Day (10) If any of the t►sted hol�days fall on Saturday, the precedmg Fnday shall be
observed as the hol�day If any of the I�sted holidays falls on a Sunday, the day observed by the Nation shall be
considered a hol►day and compensated accordmgly
S Paid Holidays New Year's Day, Memonal Day, Independence Day, Labor Day, Thanksg�vmg Day, Friday After
Thanksgrvmg Day, Chr�stmas Day, The Day After Christmas, And A Floahng Holiday (9) If any of the Lsted
holidays falls on a Sunday, the day observed by the Nation shall be cons�dered a hot�day and compensated
accordmgly
Note Codes
, 8 A
L'
In addition to the houriy wage and frmge benefits, the fotlowmg depth premiums apply to depths of fifty feet or
more
�
�
Benefit Code Key — Effective 8-31-2013 thru 3-4-2014
Over 50' To 100' -$2 00 per Foot for Each Foot Over 50 Feet
Over 100' To 150' -$3 00 per Foot for Each Foot Over 100 Feet
Over I50' To 220' -$4 00 per Foot for Each Foot Over 150 Feet
Over 220' -$5 00 per Foot for Each Foot Over 220 Feet
C In addition to the hourly wage and frmge benef►ts, the followmg depth prem�ums apply to depths of fifty feet or
more
Over 50' To 100' -$1 00 per Foot for Each Foot Over 50 Feet
Over 100' To 150' -$1 50 per Foot for Each Foot Over 100 Feet
Over 150' To 200' -$2 00 per Foot for Each Foot Over I50 Feet
Over 200' -D�vers May Name Their Own Pr�ce
D Workers workmg w�th supplied air on hazmat pro�ects rece�ve an add�t�onal $1 00 per hour
L Workers on hazmat pro�ects receive add�t�onal hourly prem�ums as follows -Level A$0 75, Level B$0 50, And
Level C $0 25
M Workers on hazmat pro�ects receive add�tional hourly premiums as follows Levels A& B$1 00, Levels C& D
$0 50
W
P
�
Workers on hazmat proJects receive add�t�onal hourly prem�ums as follows -Level A$1 00, Level B$0 75, Level
C$0 50, And Level D$0 25
Workers on hazmat pro�ects rece�ve add�tional hourly premiums as follows -Class A Su�t $2 00, Class B Su�t
$1 50, Class C Su�t $1 00, And Class D Su�t $0 50
The highest pressure registered on the gauge for an accumulated t�me of more than fifteen (15) m�nutes dur�ng the
sh�ft shall be used m determ�mng the scale pa�d
R Effect�ve August 31, 2012 — A Traffic Control Supervisor shall be present on the pro�ect whenever flaggmg or
spott�ng or other traffic control labor is bemg util�zed A Traffic Control Laborer performs the setup, mamtenance
and removal of all temporary traf�ic control devices and construction signs necessary to control vehicular, bicycle,
and pedestrian traffic during construct�on operations Flaggers and Spotters shall be posted where shown on
approved Traffic Control Plans or where directed by the Engmeer All flaggers and spotters shall possess a current
flagg�ng card �ssued by the State of Washmgton, Oregon, Montana, or ldaho These class�ficat�ons are only effective
on or after August 31, 2012
Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the pro�ect whenever flaggmg or
spottmg or other traffic control labor �s bemg utilized Flaggers and Spotters shali be posted where shown on
approved Traffic Control Plans or where directed by the Engmeer All flaggers and spotters shall possess a current
flaggmg card ►ssued by the State of Washmgton, Oregon, Montana, or ldaho This class�fication �s only effective on
or after August 31, 2012
T Effectrve August 31, 2012 — A Traffic Control Laborer performs the setup, mamtenance and removal of all
temporary traffic control dev�ces and construct�on s�gns necessary to control veh�cular, bicycle, and pedestrian
traffic dunng construction operat�ons Flaggers and Spotters shall be posted where shown on approved Traffic
Control Plans or where d�rected by the Engineer All flaggers and spotters shall possess a current flagging card
issued by the State of Washmgton, Oregon, Montana, or ldaho This classificat�on is only effectrve on or after
August 31, 2012
'
�
'�I
�
�
'
,
�
�
�
u
�
�
i
�
1
8
'
�
r
�
�
�
�
Ll
�
�
�'
�
�
,
�
�
�
�
General Decision Nurnber WA130001 09/06/2013 WA1
Superseded General Decision Number WA20120001
State Washington
Construction Type Highway
Counties Washington Statewide
HIGHWAY (Excludes D O E Hanford Site in Benton and Franklin
Counties}
Modification Number
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
CARP0001-008 09/O1/2009
Rates
Publication Date
O1/04/2013
O1/11/2013
01/18/2013
02/O1/2013
02/08/2013
02/15/2013
02/22/2013
03/08/20I3
03/15/2013
03/22/2013
04/05/2013
04/12/2013
04/19/2013
05/10/2013
06/07/2013
06/21/2013
06/28/2013
07/05/2013
07/12/2013
0`1/26/2013
08/02/2013
08/16/2013
OS/23/2013
08/30/2013
09/06/2013
Carpenters
COLUMBIA RIVER AREA -
ADAMS, BENTON, COLUMBIA,
DOUGLAS (EAST OF THE 120TH
MERIDIAN), FERRY,
FRANKLIN, GRANT, OKANOGAN
(EAST OF THE 120TH
MERIDIAN) AND WALLA WALLA
COUNTIES
GROUP 1 $ 27 73
GROUP 2 $ 29 73
GROUP 3 $ 28 00
GROUP 4 $ 27 73
GROUP 5 $ 63 50
GROUP 6 $ 30 75
Fringes
10 56
10 56
10 56
10 56
10 56
10 56
Page 1 of 39
r http //www wdol govlwdoUscafiles/davisbacon/wal dvb 9/12/2013
Page 2 of 39
GROUP '7 $ 31 7 S
GROUP 8 $ 28 00
GROUP 9 $ 33 75
SPOKANE AREA ASOTIN,
GARFIELD, LINCOLN, PEND
OREILLE, SPOKANE, STEVENS
AND WHITMAN COUNTIES
GROUP 1 $ 26 06
GROUP 2 $ 28 06
GROUP 3 $ 26 32
GROUP 4 $ 26 06
GROUP 5 $ 60 14
GROUP 6 $ 29 07
GROUP 7 $ 30 07
GROUP 8 $ 27 32
GROUP 9 $ 33 07
CARPENTER & DIVER CLASSIFICATIONS
GROUP 1 Carpenter
GROUP 2 Millwright, machine erector
10 56
10 56
10 56
10 56
10 56
10 56
10 56
10 56
1Q 56
10 56
10 56
10 56
GROUP 3 Piledriver - includes driving, pulling, cutting,
placing collars, setting, welding, or creosote treated
material, on all piling
GROUP 4 Bridge carpenters
GROUP 5 Diver Wet
GROUP 6 Diver Tender, Manifold Operator, ROV Operator
-- GROUP -7 - Diver Standby, -Bell/Vehicle- or-Submersible operator- -
Not Under Pressure
GROUP 8 Assistant Tender, ROV Tender/Technician
GROUP 9 Manifold Operator-Mixed Gas
ZONE PAY
ZONE 1 0-40 MILES FREE
ZONE 2 41-65 MILES $2 25/PER HOUR
ZONE 3 66-100 i�IILES $3 25/PER HOUR
ZONE 4 OVER 100 MILES $4 75/PER HOUR
DISPATCH POINTS
CARPENTERS/MILLWRIGHTS PASCO (515 N Neel Street) or Main
Post Office of established residence of employee (Whichever
is closest to the worksite)
CARPENTERS/PILEDRIVER SPOKANE (127 E AUGUSTA AVE ) or Main
Post Office of established residence of employee (Whichever
is closest to the worksite)
CARPENTERS WENATCHEE (27 N CHELAN) or Main Post Office of
established residence of employee (Whichever is closest to
the worksite)
http //www wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013
i
i
�
��
1
_�
�
CARPENTERS COEUR D' ALENE (1839 N GOVERNMENT WAY) or Main
Post Office of established residence of employee (Whichever
is closest to the worksite)
CARPENTERS MOSCOW (302 N JACKSON) or Main Post Office of
established residence of employee (whichever is closest to
the worksite)
DEPTH PAY FOR DIVERS BELOW WATER SURFACE
50-100 feet S2 00 per foot
101-150 feet $3 00 per foot
151-220 feet $4 00 per foot
221 feet and deeper $5 00 per foot
PREMIUM PAY FOR DIVING IN ENCLOSURES WITH NO VERTICAL ASCENT
0-25 feet Free
26-300 feet $1 00 per Foot
� SATURATION DIVING
The standby rate applies until saturation starts The
saturation diving rate applies when divers are under
pressure continuously until work task and decompression are
� complete the diver rate shall be pa3d for all saturation
hours
�
�
WORK IN COMBINATION OF CLASSIFICATIONS
Employees working in any combination of classifications
within the diving crew (except dive supervisor) in a shift
are paid in the classification with the highest rate for
that shift
HAZMAT PROJECTS
� Anyone working on a HAZMAT �ob (task), where HAZMAT
certification is required, shall be compensated at a
premium, in addition to the classification working in as
follows
�
�
�
�
I�
�
��
LEVEL D+$ 25 per hour - This is the lowest level of
protection No respirator is used and skin protection is
minimal
LEVEL C+$ 50 per hour - This level uses an air purifying
respirator or additional protective clothing
LEVEL B+$ 75 per hour - Uses same respirator protection as
Level A Supplied air line is provided in con�unction with
a chemical "splash suit"
LEVEL A+$1 00 per hour - This level utilizes a fully
encapsulated suit with a self-contained breathing apparatus
or a supplied air line
CARP0003-006 10/O1/2011
SOUTHWEST WASHINGTON CLARK, COWLITZ, KLICKITAT,
LEWIS(Piledriver only), PACIFIC (South of a straight line made
by extending the north boundary line of Wahkiakum County west
to Willapa Bay to the Pacific Ocean), SKAMANIA AND WAHKIAKUM
Page 3 of 39
� http //www wdol gov/wdoVscaf'iles/davisbacon/wal dvb 9/12/2013
Page 4 of 39
COUNTIES and INCLUDES THE ENTIRE PENINSULA WEST OF WILLAPA BAY
SEE ZONE DESCRIPTION FOR CITIES BASE POINTS
ZONE 1
Carpenters
CARPENTERS
DIVERS TENDERS
DIVERS
DRYWALL
MILLWRIGHTS
PILEDRIVERS
Rates
$ 32 04
$ 36 34
$ 77 08
$ 27 56
$ 32 19
$ 33 04
Fringes
14 18
14 18
14 18
14 18
14 18
14 18
DEPTH PAY
50 TO 100 FEET $1 00 PER FOOT OVER 50 FEET
101 TO 150 FEET $1 50 PER FOOT OVER 101 FEET
151 TO 200 FEET $2 00 PER FOOT OVER 151 FEET
Zone Differential (Add up Zone 1 rates)
Zone 2 - $0 85
Zone 3 - 1 25
Zone 4 - 1 70
Zone 5 - 2 00
Zone 6 - 3 00
BASEPOINTS ASTORIA, LONGVIEW, PORTLAND, THE DALLES, AND
VANCOWER, (NOTE All dispatches for Washington State
Counties Cowlitz, Wahkiakum and Pacific shall be from
Longview Local #1707 and mileage shall be computed from
that point )
ZONE 1 Pro�ects located within 30 miles of the respective
city hall of the above mentioned cities
ZONE 2 Pro�ects located more than 30 miles and less than 40
miles of the respective city of the above mentioned cities
ZONE 3 Pro�ects located more than 40 miles and less than 50
miles of the respective city of the above mentioned cities
ZONE 4 Pro7ects located more than 50 miles and less than 60
miles of the respective city of the above mentioned cities
ZONE 5 Pro�ects located more than 60 miles and less than 70
miles of the respective city of the above mentioned cities
ZONE 6 Pro�ects located more than 70 miles of the respected
city of the above mentioned cities
----------------------------------------------------------------
CARP0770-003 07/O1/2012
Rates Fringes
Carpenters
CENTRAL WASHINGTON
CHELAN, DOUGLAS (WEST OF
THE 120TH MERIDIAN),
KITTITAS, OKANOGAN (WEST
OF THE 120TH MERIDIAN) AND
YAKIMA COUNTIES
http //www wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013
�
�
�
�
'
L �
�J
�
r
r
�
S
1
�
�
�
�
'
�
CARPENTERS ON CREOSOTE
MATERIAL $ 25 93 12 60
CARPENTERS $ 25 83 12 60
DIVERS TENDER $ 39 15 12 60
DIVERS $ 87 20 12 60
MILLWRIGHT AND MACHINE
ERECTORS $ 37 07 12 60
PILEDRIVER, DRIVING,
PULLING, CUTTING, PLACING
COLLARS, SETTING, WELDING
OR CRESOTE TREATED
MATERIAL, ALL PILING $ 36 22 12 60
(HOURLY ZONE PAY WESTERN AND CENTRAL WASHINGTON - ALL
CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS
Hourly Zone Pay shall be paid on �obs located outside of the
free zone computed from the city center of the following
listed cities
Seattle Olympia Bellingham
Auburn Bremerton Anacortes
Renton Shelton Yakima
Aberdeen-Hoquiam Tacoma Wenatchee
Ellensburg Everett Port Angeles
Centralia Mount Vernon Sunnyside
Chelan Pt Townsend
Zone Pay
0 -25 radius miles Free
26-35 radius miles $1 00/hour
36-45 radius miles $1 15/hour
46-55 radius miles $1 35/hour
Over 55 radius miles $1 55/hour
(HOURLY ZONE PAY WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT
AND PILEDRIVER ONLY)
Hourly Zone Pay shall be computed from Seattle Union Hall,
Tacoma City center, and Everett City center
Zone Pay
0 -25 radius miles Free
2b-45 radius miles $ 70/hour
Over 45 radius miles $1 50/hour
--------------------------
CARP0770-006 07/07/2012
Carpenters
WESTERN WASHINGTON
CLALLAM, GRAYS HARBOR,
ISLAND, JEFFERSON, KING,
KITSAP, LEWIS (excludes
piledrzvers only), MASON,
PACIFIC (North of a
straight line made by
extending the north
Rates Fringes
http //www wdol gov/wdoUscaf'iles/davisbacon/wal dvb
Page 5 of 39
,
9/12/2013
Page 6 of 39
boundary line of Wahkiakum
County west to the Pacific
Ocean), PIERCE, SAN JUAN,
SKAGIT, SNOHOMISH,
THURSTON AND WHATCOM
COUNTIES
BRIDGE CARPENTERS $ 35 39 13 60
CARPENTERS OIV CREOSOTE
MATERIAL $ 35 49 13 60
CARPENTERS $ 35 39 13 60
DIVERS TENDER $ 39 15 13 60
DIVERS $ 87 20 13 60
MILLWRIGHT AND MACHINE
ERECTORS $ 36 39 13 60
PILEDRIVER, DRIVING,
PULLING, CUTTING, PLACING
COLLARS, SETTING, WELDING
OR CRESOTE TREATED
MATERIAL, ALL PILING $ 35 59 13 60
(HOURLY ZONE PAY WESTERN AND CENTRAL WASHINGTON - ALL
CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS
Hourly Zone Pay shall be paid on �obs located outside of the
free zone computed from the city center of the following
listed cities
Seattle Olympia Bellingham
Auburn Bremerton Anacortes
Renton Shelton Yakima
Aberdeen-Hoquiam Tacoma Wenatchee
Ellensburg Everett Port Angeles
Centralia Mount Vernon Sunnyside
Chelan Pt Townsend
Zone Pay
0 -25 radius miles Free
26-35 rad3us miles $1 00/hour
36-45 radius miles S1 15/hour
46-55 radius miles $1 35/hour
Over 55 radius miles $1 55/hour
(HOURLY ZONE PAY WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT
AND PILEDRIVER ONLY)
Hourly Zone Pay shall be computed from Seattle Union Hall,
Tacoma City center, and Everett City center
Zone Pay
0 -25 radius miles Free
26-45 radius miles $ 70/hour
Over 45 radius miles $1 50/hour
----------------------------------------------------------------
ELEC0046-001 02/04/2013
CALLAM, JEFFERSON, KING AND KITSAP COUNTIES
Rates Fringes
http //www wdol gov/wdollscafiles/davisbacon/wal dvb 9/12/2013
�
�
�
�
�
�
�
�
�
r
�
�
�
�
�
t
�
�
r
CABLE SPLICER $ 46 87 30+15 96
ELECTRICIAN $ 42 61 3$+15 96
----------------------------------------------------------------
* ELEC0048-003 O1/O1/2013
CLARK, KLICKITAT AND SKAMANIA COUNTIES
Rates Fringes
CABLE SPLICER $ 41 85 18 44
ELECTRICIAN $ 38 05 18 44
HOURLY ZONE PAY
Hourly Zone Pay shall be paid on �obs located outside of the
free zone computed from the city center of the following
listed cities
Portland, The Dalles, Hood River, Tillamook, Seaside and
Astoria
Zone Pay
Zone 1 31-50 miles $1 50/hour
Zone 2 51-70 miles $3 50/hour
Zone 3 �1-90 miles $5 50/hour
Zone 4 Beyond 90 miles $9 00/hour
*These are not m�les dr�ven Zones are based on Delorrne
Street Atlas USA 2006 plus
ELEC0048-029 O1/01/2013
COWLITZ AND WAHKIAKUM COUNTY
Rates Fringes
CABLE SPLICER $ 41 85 16 39
ELECTRICIAN $ 38 05 16 39
----------------------------------------------------------------
ELEC0073-001 07/O1/2013
ADAMS, FERRY, LINCOLN, PEND OREILLE, SPOKANE, STEVENS, WHITMAN
COUNTIES
Rates Fringes
CABLE SPLICER $ 31 98 16 15
ELECTRICIAN $ 29 07 16 15
----------------------------------------------------------------
ELEC0076-002 09/O1/2012
GRAYS HARBOR, LEWIS, MASON, PACIFIC, PIERCE, AND THURSTON
COUNTIES
CABLE SPLICER
Rates Fringes
$ 37 54 21 62
http //www wdol gov/wdoUscafiles/davisbacon/wal dvb
Page 7 of 39
9/12/2013
Page 8 of 39
ELECTRICIAN $ 34 13 21 62
----------------------------------------------------------------
ELEC0112-005 07/O1/2013
ASOTIN, BENTON, COLUMBIA, FRANKLIN, GARFIELD, KITTITAS, WALLA
WALLA, YAKIMA COUNTIES
Rates Fringes
CABLE SPLICER $ 38 90 17 35
ELECTRICIAN $ 37 05 17 29
----------------------------------------------------------------
ELEC0191-003 06/01/2013
ISLAND, SAN JUAN, SNOHOMISH, SKAGIT AND WHATCOM COUNTIES
Rates Fringes
CABLE SPLICER $ 42 91 17 39
ELECTRICIAN $ 39 O1 17 39
----------------------------------------------------------------
ELEC0191-004 07/O1/2013
CHELAN, DOUGLAS, GRANT AND OKANOGAN COUNTIES
Rates Fringes
CABLE SPLICER $ 39 50 17 30
ELECTRICIAN $ 35 91 17 3
----------------------------------------------------------------
* ENGI0302-003 06/O1/2013
CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF
THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING,
KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN),
SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE
120TH MERIDIAN) COUNTIES
PROJECTS CATEGORY A PROJECTS (EXCLUDES CATEGORY B PROJECTS, AS
SHOWN BELOW)
Zone 1 (0-25 radius miles)
Rates
Power equipment operators
Group lA $ 37 39
Group lAA $ 37 96
Group lAAA $ 38 52
Group 1 $ 36 84
Group 2 $ 36 35
Group 3 $ 35 93
Group 4 $ 33 57
Zone Differential (Add to Zone 1 rates)
Zone 2(26-45 radius miles) -$1 00
Zone 3(Over 45 radius miles) -$1 30
Fringes
16 65
16 65
16 65
16 65
16 65
16 65
16 65
http //www wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013
'
�
�
�
�
�
1
CJ'
�
�
�
1
��
�
�
�
�
�
BASEPOINTS Aberdeen, Bellingham, Bremerton, Everett, Kent,
Mount Vernon, Port Angeles, Port Townsend, Seattle,
Shelton, Wenatchee, Yakima
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP lAAA - Cranes-over 300 tons, or 300 ft of boom
(including �ib with attachments)
GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom
(including �ib with attachments), Tower crane over 175 ft
in height, base to boom
GROUP lA - Cranes, 100 tons thru 199 tons, or 150 ft of boom
(including �ib with attachments), Crane-overhead, bridge
type, 100 tons and over, Tower crane up to 175 ft in height
base to boom, Loaders-overhead, 8 yards and over, Shovels,
excavator, backhoes-6 yards and over with attachments
GROUP 1- Cableway, Cranes 45 tons thru 99 tons, under 150 ft
of boom (including �ib with attachments), Crane-overhead,
bridge type, 45 tons thru 99 tons, Derricks on building
work, Excavator, shovel, backhoes over 3 yards and under 6
yards, Hard tail end dump articulating off-road equipment
45 yards and over, Loader- overhead 6 yards to, but not
including 8 yards, Mucking machine, mole, tunnel, drill
and/or shield, Quad 9, HD 41, D-10, Remote control
on rubber tired earth moving equipment, Rollagon,
Scrapers-self propelled 45 yards and over, Slipform
Transporters, all truck or track type
operator
pavers,
GROUP 2- Barrier machine (zipper), Batch Plant Operaor-
Concrete, Bump Cutter, Cranes, 20 tons thru 44 tons with
attachments, Crane-overhead, bridge type-20 tons through 49
tons, Chipper, Concrete Pump-truck mount with boom
attachment, Crusher, Deck Engineer/Deck Winches (power),
Drilling machine, Excavator, shovel, backhoe-3yards and
under, Finishing Machine, Bidwell, Gamaco and similar
equipment, Guardrail punch, Horizontal/directional drill
operator, Loaders-overhead under 6 yards, Loaders-plant
feed, Locomotives-all, Mechanics-all, Mixers-asphalt plant,
Motor patrol graders-finishing, Piledriver (other than
crane mount), Roto-mill,roto-grinder, Screedman, spreader,
topside operator-Blaw Knox, Cedar Rapids, Jaeger,
Caterpillar, Barbar Green, Scraper-self propelled, hard
tail end dump, articulating off-road equipment-under 45
yards, Subgrade trimmer, Tractors, backhoes-over 75 hp,
Transfer material service machine-shuttle buggy, blaw
knox-roadtec, Truck crane oiler/driver-100 tons and over,
Truck Mount portable conveyor, Yo Yo Pay dozer
GROUP 3- Conveyors, Cranes-thru 19 tons with attachments,
A-frame crane over 10 tons, Drill oilers-auger type, truck
or crane mount, Dozers-D-9 and under, Forklift-3000 lbs
and over with attachments, Horizontal/directional drill
locator, Outside hoists-(elevators and manlifts), air
tuggers, strato tower bucket elevators, Hydralifts/boom
trucks over 10 tons, Loader-elevating type, belt, Motor
patrol grader-nonfinishing, Plant oiler- asphalt, crusher,
Pumps-concrete, Roller, plant mix or multi-lift materials,
Page 9 of 39
r http //www wdol gov/wdoUscaf'ilesldavisbacon/wal dvb 9/12/2013
Page 10 of 39
Saws-concrete, Scrpers-concrete and carry-all, Service
engineer-equipment, Trenching machines, Truck Crane
Oiler/Driver under 100 tons, Tractors, backhoe 75 hp and
under
GROUP 4- Assistant Engineer, Bobcat, Brooms, Compressor,
Concrete finish mahine-laser screed, Cranes-A frame-10 tons
and under, Elevator and Manlift-permanent or shaft type,
Gradechecker, Stakehop, Forklifts under 3000 lbs with
attachments, Hydralifts/boom trucks, 10 tons and under, Oil
distributors, blower distribution and mulch seeding
operator, Pavement breaker, Posthole digger, mechanical,
Power plant, Pumps, water, Rigger and Bellman, Roller-other
than plant mix, Wheel Tractors, farmall type,
Shotcrete/gunite equipment operator
Category B Pro�ects 95� of the basic hourly reate for each
group plus full fringe benefits applicable to category A
pro7ects shall apply to the following pro�ects A Reduced
rates may be paid on the following
1 Pro�ects involving work on structures such as buildings
and bridges whose total value is less than $1 5 million
excluding mechanical, electrical, and utility portions of
the contract
2 Pro�ects of less than $1 million where no building is
involved Surfacing and paving included, but utilities
excluded
3 Marine pro�ects (docks, wharfs, etc ) less than $150,000
HANDLING OF HAZARDOUS WASTE MATERIALS
Personnel in all craft classifications sub�ect to working
inside a federally designated hazardous perimeter shall be
elgible for compensation in accordance with the following
group schedule relative to the level of hazardous waste as
outlined in the specific hazardous waste pro�ect site
safety plan
H-Z Base wage rate when on a hazardous waste site when not
outfitted with protective clothing
H-2 Class "C" Suit - Base wage rate plus $ 25 per hour
H-3 Class "B" Suit - Base wage rate plus $ 50 per hour
H-4 Class "A" Suit - Base wage rate plus $ 75 per hour
Zone Differential (Add to Zone 1 rates)
Zone 2(26-45 radius miles) -$ 70
Zone 3(Over 45 radius miles) -$1 00
BASEPOINTS Aberdeen, Bellingham, Bremerton, Everett, Kent,
Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton,
Wenatchee, Yakima
http //www wdol gov/wdoVscafiles/davisbacon/wal dvb 9/12/2013
�
r
LJ
�
�
�
�
�
�
�
�
�
��
�
�
�
�
�
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP lAAA - Cranes-over 300 tons, or 300 ft of boom
(including �ib with attachments)
GROUP lAA - Cranes 200 to 300 tons, or 250 ft of boom
(including 7ib with attachments), Tower crane over 175 ft in
height, base to boom
GROUP lA - Cranes, 100 tons thru 199 tons, or 150 ft of boom
(including 7ib with attachments), Crane-overhead, bridge
type, 100 tons and over, Tower crane up to 175 ft in height
base to boom, Loaders-overhead, S yards and over, Shovels,
excavator, backhoes-6 yards and over with attachments
GROUP 1- Cableway, Cranes 45 tons thru 99 tons, under 150 ft
of boom (including �ib with attachments), Crane-overhead,
bridge type, 45 tons thru 99 tons, Derricks on building work,
Excavator, shovel, backhoes over 3 yards and under 6 yards,
Hard tail end dump articu].ating off-road equipment 45 yards
and over, Loader- overhead 6 yards to, but not including 8
yards, Mucking machine, mole, tunnel, drill and/or shield,
Quad 9, HD 41, D-10, Remote control operator on rubber tired
earth moving equipment, Rollagon, Scrapers-self propelled 45
yards and over, Slipform pavers, Transporters, all truck or
track type
GROUP 2- Barrier machine (zipper), Batch Plant Operaor-
Concrete, Bump Cutter, Cranes, 20 tons thru 44 tons with
attachments, Crane-overhead, bridge type-20 tons through 44
tons, Chipper, Concrete Pump-truck mount with boom
attachment, Crusher, Deck Engineer/Deck Winches (power),
Drilling machine, Excavator, shovel, backhoe-3 yards and
under, Finishing Machine, Bidwell, Gamaco and similar
equipment, Guardrail punch, Horizontal/directional drill
operator, Loaders-overhead under 6 yards, Loaders-plant feed,
Locomotives-all, Mechanics-all, Mixers-asphalt plant, Motor
patrol graders-finishing, Piledriver (other than crane
mount), Roto-mill,roto-grinder, Screedman, spreader, topside
operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar
Green, Scraper-self propelled, hard tail end dump,
articulating off-road equipment-under 45 yards, Subgrade
trimmer, Tractors, backhoes-over 75 hp, Transfer material
service machine-shuttle buggy, blaw knox-roadtec, Truck crane
oiler/driver-100 tons and over, Truck Mount portable
conveyor, Yo Yo Pay dozer
GROUP 3- Conveyors, Cranes-thru 19 tons with attachments,
A-frame crane over 10 tons, Drill oilers-auger type, truck or
crane mount, Dozers-D-9 and under, Forklift-3000 lbs and
over with attachments, Horizontal/directional drill locator,
Outside hoists-(elevators and manlifts), air tuggers, strato
tower bucket elevators, Hydralifts/boom trucks over 10 tons,
Loader-elevating type, belt, Motor patrol
grader-nonfinishing, Plant oiler- asphalt, crusher,
Pumps-concrete, Roller, plant mix or multi-lift materials,
Saws-concrete, Scrpers-concrete and carry-all, Service
engineer-equipment, Trenching machines, Truck Crane
Oiler/Driver under 100 tons, Tractors, backhoe 75 hp and under
Page 11 of 39
, http //www wdol gov/wdoUscaf'iles/davisbacon/wal dvb 9/12/2013
Page 12 of 39
GROUP 4- Assistant Engineer, Bobcat, Brooms, Compressor,
Concrete finish mahine-laser screed, Cranes-A frame-10 tons
and under, Elevator and Manlift-permanent or shaft type,
Gradechecker, Stakehop, Forklifts under 3000 lbs with
attachments, Hydralifts/boom trucks, 10 tons and under, Oil
distributors, blower distribution and mulch seeding operator,
Pavement breaker, Posthole digger, mechanical, Power plant,
Pumps, water, Rigger and Bellman, Roller-other than plant
mix, Wheel Tractors, farmall type, Shotcrete/gunite equipment
operator
CATEGORY B PROJECTS 95% OF THE BASIC HOURLY RATE FOR EACH
GROUP PLUS FULL FRINGE BENEFITS APPLICABLE TO CATEGORY A
PROJECTS SHALL APPLY TO THE FOLLOWING PROJECTS REDUCED
RATES MAY BE PAID ON THE FOLLOWING
1 Pro�ects involving work on structures such as buildings
and bridges whose total value is less than $1 5
million excluding mechanical, electrical, and utility portions
of the contract
2 Pro�ects of less than $1 million where no building is
involved Surfacing and paving including, but
utilities excluded
3 Marine pro�ects (docks, wharfs, ect ) less than $150,000
HANDLING OF HAZARDO[JS WASTE MATERIALS Personnel in all craft
classifications sub7ect to working inside a federally designed
hazardous perimeter shall be elgible for compensation in
accordance with the following group schedule relative to the
level of hazardous waste as outlzned in the specific hazardous
waste pro�ect site safety plan
H-1 Base wage rate when on a hazardous waste site when not
outfitted with protective clothing
H-2 Class "C" Suit - Base wage rate plus $ 25 per hour
H-3 Class "B" Suit - Base wage rate plus $ 50 per hour
H-4 Class "A" Suit - Base wage rate plus $ 75 per hour
----------------------------------------------------------------
* ENGI0302-038 06/O1/2013
LEWIS,PIERCE, PACIFIC (portion lying north of a parallel line
extending west from the northern boundary of Wahkaikum County
to the sea) AND THURSTON COUNTIES
ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH
GROUP SHALL BE 90% OF THE BASE RATE PLUS FULL FRINGE BENEFITS
ON ALL OTHER WORK, THE FOLLOWING RATES APPLY
Zone 1 (0-25 radius miles)
Power equipment operators
GROUP lA
GROUP lAA
GROUP lAAA
GROUP 1
Rates
$ 37 39
$ 37 96
$ 38 52
$ 36 84
Fringes
16 65
16 65
16 65
16 65
http /lwww wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013
i
�
GROUP 2
GROUP 3
GROUP 4
$ 36 35
$ 35 93
$ 33 57
16 65
16 65
16 65
r
�
LJ
�
L�
�
Zone Differential (Add to Zone 1 rates)
Zone 2(26-45 radius miles) _$ 70
Zone 3(Over 45 radius miles) - S1 00
BASEPOINTS CENTRALIA, OLYMPIA, TACOMA
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1 AAA - Cranes-over 300 tons or 300 ft of boom
(including �ib with attachments)
GROUP lAA - Cranes- 200 tonsto 300 tons, or 250 ft of boom
(including �ib with attachments, Tower crane over 175 ft in
height, bas to boom
GROUP lA - Cranes, 100 tons thru 199 tons, or 150 ft of boom
(including �ib with attachments), Crane-overhead, bridge
type, 100 tons and over, Tower crane up to 175 ft in height
base to boom, Loaders-overhead, 8 yards and over, Shovels,
excavator, backhoes-6 yards and over with attachments
� GROUP 1- Cableway, Cranes 45 tons thru 99 tons under 150 ft
of boom (including �ib with attachments), Crane-overhead,
bridge type, 45 tons thru 99 tons, Derricks on building
work, Excavator, shovel, backhoes over 3 yards and under 6
� yards, Hard tail end dump articulating off-road equipment
45 yards and over, Loader- overhead, 6 yards to, but not
including, $ yards, Mucking machine, mole, tunnel, drill
and/or shield, Quad 9 HD 41, D-10, Remote control operator
� on rubber tired earth moving equipment, Rollagon, Scrapers-
self-propelled 45 yards and over, Slipform pavers,
Transporters, all track or truck type
�
�
�
r
�
u
�
�
GROUP 2- Barrier machine (zipper), Batch Plant Operator-
concrete, Bump Cutter, Cranes, 20 tons thru 44 tons with
attachments, Crane-Overhead, bridge type, 20 tons through
44 tons, Chipper, Concrete pump-truck mount with boom
attachment, Crusher, Deck engineer/deck winches (power),
Drilling machine, Excavator, shovel, backhoe-3 yards and
under, Finishing machine, Bidwell, Gamaco and similar
equipment, Guardrail punch, Loaders, overhead under 6
yards, Loaders-plant feed, Locomotives-all, Mechanics- all,
Mixers, asphalt plant, Motor patrol graders, finishing,
Piledriver (other than crane mount), Roto-mill, roto-
grinder, Screedman, spreader, topside operator-Blaw Knox,
Cedar Rapids, Jaeger, Caterpillar, Barbar Green,
Scraper-self- propelled, hard tail end dump, articulating
off-road equipment- under 45 yards, Subgrader trimmer,
Tractors, backhoe over 75 hp, Transfer material service
machine-shuttle buggy, Blaw Knox- Roadtec, Truck Crane
oiler/driver-100 tons and over, Truck Mount Portable
Conveyor, Yo Yo pay
GROUP 3- Conveyors, Cranes through 19 tons with attachments,
Crane-A-frame over 10 tons, Drill oilers-auger type, truck
or crane mount, Dozer-D-9 and under, Forklift-3000 lbs and
Page 13 of 39
� http //www wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013
over with attachments, Horizontal/directional drill
locator, Outside Hoists-(elevators and manlifts), air
tuggers, strato tower bucket elevators, Hydralifts/boom
trucks over 10 tons, Loaders-elevating type, belt, Motor
patrol grader-nonfinishing, Plant oiler- asphalt, crusher,
Pump-Concrete, Roller, plant mix or multi-lfit materials,
Saws-concrete, Scrapers, concrete and carry all, Service
engineers-equipment, Trenching machines, Truck crane
oiler/driver under 100 tons, Tractors, backhoe under 75 hp
GROUP 4- Assistant Engineer, Bobcat, Brooms, Compressor,
Concrete Finish Machine-laser screed, Cranes A-frame 10
tons and under, Elevator and manlift (permanent and shaft
type), Forklifts-under 3000 lbs with attachments,
Gradechecker, stakehop, Hydralifts/boom trucks, 10 tons and
under, Oil distributors, blower distribution and mulch
seeding operator, Pavement breaker, Posthole
digger-mechanical, Power plant, Pumps-water, Rigger and
Bellman, Roller-other than plant mix, Wheel Tractors,
farmall type, Shotcrete/gunite equipment operator
FOOTNOTE A- Reduced rates may be paid on the following
1 Pro7ects involving work on structures such as buildings
and bridges whose total value is less than $1 5 million
excluding mechanical, electrical, and utility portions of
the contract
2 Pro�ects of less than $1 million where no building is
involved Surfacing and paving included, but utilities
excluded
3 Marine pro�ects (docks, wharfs, etc ) less than $150,000
-- HANDLING OF HAZARDOUS WASTE MATERIALS -Personnel in-all -
craft classifications sub�ect to working inside a federally
designated hazardous perimeter shall be elgible for
compensation in accordance with the following group
schedule relative to the level of hazardous waste as
outlined in the specific hazardous waste pro�ect site
safety plan
H-1 Base wage rate when on a hazardous waste site when not
outfitted with protective clothing
H-2 Class "C" Suit - Base wage rate plus $ 25 per hour
H-3 Class "B" Suit - Base wage rate plus $ 50 per hour
H-4 Class "A" Suit - Base wage rate plus $ 75 per hour
----------------------------------------------------------------
ENGI0370-002 06/Ol/2013
ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN),
COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY,
FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH
MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN
AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES
ZONE 1
Rates
Fringes
Page 14 of 39
i
�
,
�
'� I
�J
�
�
�
�
L�
�
�
�
�
�
�
�
�
http //www wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013 �
�
�J �_
r
1
�
�
�
�
�J
�
�
�
�
�
1
�
�
�
Power equipment operators
GROUP 1
GROUP 2
GROUP 3
GROUP 4
GROUP 5
GROUP 6
GROUP 7
GROUP 8
$ 25 56
$ 25 88
$ 26 49
$ 26 65
$ 26 Sl
$ 27 09
$ 27 36
$ 28 46
12 85
12 85
12 85
12 85
12 85
12 85
12 85
12 85
ZONE DIFFERENTIAL (Add to Zone 1 rate) Zone 2-$2 00
Zone 1 Within 45 mile radius of Spokane, Pasco, Washington,
Lewiston, Idaho
Zone 2 Outside 45 mile radius of Spokane, Pasco,
Washington, Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1 Bit Grinders, Bolt Threading Machine, Compressors
(under 2000 CFM, gas, diesel, or electric power), Deck
Hand, Fireman & Heater Tender, Hydro-seeder, Mulcher,
Nozzleman, Oiler Driver, & Cable Tender, Mucking Machine,
Pumpman, Rollers, all types on subgrade, including seal and
chip coatings (farm type, Case, John Deere & similar, or
Compacting Vibrator), except when pulled by Dozer with
operable blade, Welding Machine, Crane Oiler-Driver (CLD
required) & Cable Tender, Mucking Machine
GROUP 2 A-frame Truck (single drum), Assistant Refrigeration
Plant (under 1000 ton), Assistant Plant Operator, Fireman
or Pugm�xer (asphalt), Bagley or Stationary Scraper, Belt
Finish�ng Machine, Blower Operator (cement), Cement Hog,
Compressor (2000 CFM or over, 2 or more, gas diesel or
electric power), Concrete Saw (multiple cut), Distr�butor
Leverman, Ditch Witch or similar, Elevator Hoisting
Materials, Dope Pots (power agitated), Fork Lift or Lumber
Stacker, hydra-lift & similar, Gin Trucks (pipeline),
Hoist, single drum, Loaders (bucket elevators and
conveyors), Longitudinal Float, Mixer (portable-concrete),
Pavement Breaker, Hydra-Hammer & similar, Power Broom,
Railroad Ballast Regulation Operator (self-propelled),
Railroad Power Tamper Operator (self-propelled), Railroad
Tamper Jack Operator (self-propelled, Spray Curing Machine
(concrete), Spreader Box (self-propelled), Straddle Buggy
(Ross & similar on construction �ob only), Tractor (Farm
type R/T with attachment, except Backhoe), Tugger Operator
GROUP 3 A-frame Truck (2 or more drums), Assistant
Refrigeration Plant & Chiller Operator (over 1000 ton),
Backfillers (Cleveland & similar), Batch Plant & Wet Mix
Operator, single unit (concrete), Belt-Crete Conveyors with
power pack or similar, Belt Loader (Kocal or similar),
Bending Machine, Bob Cat (Skid Steer), Boring Machine
(earth), Boring Machine (rock under 8 inch bit) (Quarry
Master, Joy or similar), Bump Cutter (Wayne, Saginau or
similar), Canal Lining Machine (concrete), Chipper (without
crane), Cleaning & Doping Machine (pipeline), Deck
Page 15 of 39
r http //www wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013
Page 16 of 39
Engineer, Elevating Belt-type Loader (Euclid, Barber Green
& similar), Elevating Grader-type Loader (Dumor, Adams or
similar), Generator Plant Engineers (diesel or electric),
Gunnite Combination Mixer & Compressor, Locomotive
Engineer, Mixermobile, Mucking Machine, Posthole Auger or
Punch, Pump (grout or 7et), Soil Stabilizer (P & H or
similar), Spreader Machine, Dozer/Tractor (up to D-6 or
equivalent) and Traxcavator, Traverse Finish Machine,
Turnhead Operator
GROUP 4 Concrete Pumps (squeeze-crete, flow-crete, pump-
crete, Whitman & similar), Curb Extruder (asphalt or
concrete), Drills (churn, care, calyx or diamond),
Equipment Serviceman, Greaser & Oiler, Hoist (2 or more
drums or Tower Hoist), Loaders (overhead & front-end, under
4 yds R/T), Refrigeration Plant Engineer (under 1000 ton),
Rubber-tired Skidders (R/T with or without attachments),
Surface Heater & Plant Machine, Trenching Machines (under 7
ft depth capacity), Turnhead (with re-screening), Vacuum
Drill (reverse circulation drill under 8 inch bit)
GROUP 5 Backhoe (under 45,000 gw), Backhoe & Hoe Ram (under
3/4 yd ), Carrydeck & Boom Truck (under 25 tons), Cranes
(25 tons & under), all attachments including clamshell,
dragline, Derricks & Stifflegs (under 65 tons), Drilling
Equipment(8 inch bit & over) (Robbins, reverse circulation
& similar), Hoe Ram, Piledriving Engineers, Paving (dual
drum), Railroad Track Liner Operaotr (self-propelled),
Refrigeration Plant Engineer (1000 tons & over), Siqnalman
{Whirleys, Highline Hammerheads or similar), Grade Checker
GROUP 6 Asphalt Plant Operator, Automatic Subqrader (Ditches
& Trimmers)(Autograde, ABC, R A Hansen & similar on grade
wire), Backhoe (45,000 gw and over to 110,000 gw), Backhoes
& Hoe Ram (3/4 yd to 3_yd ), Batch Plant (over 4 units),
Batch & Wet Mix Operator (multiple units, 2& incl 4),
Blade Operator (motor patrol & attachments), Cable
Controller (dispatcher), Compactor (self-propelled with
blade), Concrete Pump Boom Truck, Concrete Slip Form Paver,
Cranes (over 25 tons, to and including 45 tons), all
attachments includinq clamshell, dragline, Crusher, Grizzle
& Screening Plant Operator, Dozer, 834 R/T & similar, Drill
Doctor, Loader Operator (front-end & overhead, 4 yds incl
8 yds ), Multiple Dozer Units with single blade, Paving
Machine (asphalt and concrete), Quad-Track or similar
equipment, Rollerman (finishing asphalt pavement), Roto
Mill (pavement grinder), Scrapers, all, rubber-tired,
Screed Operator, Shovel(under 3 yds ), Trenching Machines
(7 ft depth & over), Tug Boat Operator Vactor guzzler,
super sucker, Lime Batch Tank Operator (REcycle Train),
Lime Brain Operator (Recycle Train), Mobile Crusher
Operator (Recycle Train)
GROUP 7 Backhoe (over 110,000 gw), Backhoes & Hoe Ram (3 yds
& over), Blade (finish & bluetop) Automatic, CMI, ABC,
Finish Athey & Huber & similar when used as automatic,
Cableway Operators, Concrete Cleaning/Decontamination
machine operator, Cranes (over 45 tons to but not including
85 tons), all attachments including clamshell and dragine,
Derricks & Stiffleys (65 tons & over), Elevating Belt
http //www wdol gov/wdoUscaf'iles/davisbacon/wal dvb 9l12/2013
,
� (Holland type), Heavy equipment robotics operator, Loader
(360 degrees revolving Koehring Scooper or similar),
Loaders (overhead & front-end, over 8 yds to 10 yds ),
� Rubber-tired Scrapers (multiple engine with three or more
scrapers), Shovels (3 yds & over), Whirleys & Hammerheads,
ALL, H D Mechanic, H D Welder, Hydraulic Platform
Trailers (Goldhofer, Shaurerly andSimilar), Ultra High
� Pressure Wateriet Cutting Tool System Operator {30,000
psi), Vacuum Blasting Machine Operator
GROUP 8 Cranes (85 tons and over, and all climbing,
� overhead,rail and tower), all attachments including
clamshell, dragline, Loaders (overhead and front-end, 10
yards and over), Helicopter Pilot
r
�
�
�
�
�
,
��
� �
BOOM PAY (All Cranes, Including Tower)
180 ft to 250 ft $ 50 over scale
Over 250 ft S 80 over scale
NOTE
In computing the length of the boom on Tower Cranes, they
shall be measured from the base of the Tower to the point
of the boom
HAZMAT
Anyone working on HAZMAT �obs, working with supplied air
shall receive $1 00 an hour above classification
----------------------------------------------------------------
ENGI0701-002 O1/O1/2013
CLARK, COWLITZ, KLICKKITAT, PACIFIC (SOUTH), SKAMANIA, AND
WAHKIAKUM COIINTIES
Page 17 of 39
POWER RQUIPMENT OPERATORS ZONE 1
Power equipment operators
(See Footnote A)
GROUP 1
GROUP lA
GROUP 1B
GROUP 2
GROUP 3
GROUP 4
GROUP 5
GROUP 6
Rates
$ 37 63
$ 39 51
$ 41 39
$ 35 97
$ 34 96
$ 34 00
$ 32 88
$ 29 84
Fringes
13 55
13 55
13 55
13 55
13 55
13 55
13 55
13 55
Zone Differential (add to Zone 1 rates)
Zone 2 - $3 00
Zone 3 - S6 00
For the following metropolitan counties MULTNOMAH,
CLACKAMAS, MARION, WASHINGTON, YAMHILL, AND COLUMBIA,
CLARK, AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS
INDICATED
All ?obs or pro�ects located in Multnomah, Clackamas and
� http //www wdol gov/wdoUscaf'iles/davisbacon/wal dvb 9/12/2013
Page 18 of 39
Marion Counties, West of the western boundary of Mt Hood
National Forest and West of Mile Post 30 on Interstate 84
and West of Mile Post 30 on State Highway 26 and West of
Mile Post 30 on Highway 22 and all �obs or pro�ects located
in Yamhill County, Washington County and Columbia County
and all 7obs or por�ects located in Clark & Cowlitz County,
Washington except that portion of Cowlitz County in the Mt
St Helens "Blast Zone" shall receive Zone I pay for all
classifications
All 7obs or pro�ects located in the area outside the
identified boundary above, but less than 50 miles from the
Portland City Hall shall receive Zone II pay for all
class�fications
All �obs or pro7ects located more than 50 miles from the
Portland City Hall, but outside the identified border
above, shall receive Zone TII pay for all classifications
For the following cities ALBANY, BEND, COOS BAY, EUGENE,
GRANTS PASS, KLAMATH FALLS, MEDFORD, ROSEBURG
All �obs or pro�ects located within 30 miles of the
respective city hall of the above mentioned cities shall
receive Zone I pay for all classifications
All �obs or pro�ects located more than 30 miles and less than
50 miles from the respective city hall of the above
mentioned cities shall receive Zone II pay for all
classifications
Al1 �obs or pro�ects located more than 50 miles from the
respective city hall of the above mentioned cities shall
receive Zone III pay for all classifications
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1 CONCRETE Batch Plant and/or Wet Mix Operator, three
units or more, CRANE Helicopter Operator, when used in
erecting work, Whirley Operator, 90 ton and over, LATTICE
BOOM CRANE Operator 200 tons through 299 tons, and/or over
200 feet boom, HYDRAULIC CRANE Hydraulic Crane Operator 90
tons through 199 tons with luffing or tower attachments,
FLOATING EQUIPMENT Floating Crane, 150 ton but less than
250 ton
GROUP lA HYDRAULIC CRANE Hydraulic Operator, 200 tons and
over (with luffing or tower attachment), LATTICE BOOM
CRANE Operator, 200 tons through 299 tons, with over 200
feet boom, FLOATING EQUIPMENT Floating Crane 250 ton and
over
GROUP 1B LATTICE BOOM CRANE Operator, 300 tons through 399
tons with over 200 feet boom, Operator 400 tons and over,
FLOATING EQUIPMENT Floating Crane 350 ton and over
GROUP 2 ASPHALT Asphalt Plant Operator (any type), Roto
Mill, pavement profiler, operator, 6 foot lateral cut and
over, BLADE Auto Grader or "Trimmer" (Grade Checker
required), Blade Operator, Robotic, BULLDOZERS Bulldozer
http //www wdol gov/wdoVscafiles/davisbacon/wal dvb 9/12/2013
�
�
�
�
r
L1
�
�
�
�
�
�
M
�
,
'
��
J
�J
operator over 120,OQ0 lbs and above, Bulldozer operator,
twin engine, Bulldozer Operator,tandem, quadnine, D10, D11,
and similar type, Bulldozere Robotic Equipment (any type,
CONCRETE Batch Plant and/or Wet Mix Operator, one and two
drum, Automatic Concrete Slip Form Paver Operator, Concrete
Canal Line Operator, Concrete Profiler, Diamond Head,
CRANE Cableway Operator, 25 tons and over, HYDRAULIC
CRANE Hydraulic crane operator 90 tons through 199 tons
(without luffing or tower attachment), TOWER/WHIRLEY
OPERATOR Tower Crane Operator, Whirley Operator, under 90
tons, LATTICE BOOM CRANE 90 through 199 tons and/or 150 to
200 feet boom, CRUSHER Crusher Plant Operator, FLOATING
EQUIPMENT Floating Clamshell, etc operator, 3 cu yds
and over, Floating Crane (derrick barge) Operator, 30 tons
but less than 150 tons, LOADERS Loader operator, 120,000
lbs and above, REMOTE CONTROL Remote controlled
earth-moving equipment, RUBBER-TIRED SCRAPERS Rubber-
tired scraper operator, with tandem scrapers, multi-engine,
SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER OPERATOR Shovel,
Dragline, Clamshell, operator 5 cu yds and over, TRENCHING
MACHINE Wheel Excavator, under 750 cu yds per hour
(Grade Oiler required), Canal Trimmer (Grade Oiler
required), Wheel Excavator, over 750 cu yds per hour,
Band Wagon (in con�unction with wheel excavator),
UNDERWATER EQUIPMENT Underwater Equipment Operator, remote
or otherwise, HYDRAULIC HOES-EXCAVATOR Excavator over
130,000 lbs , HYDRAULIC CRANE Hydraulic crane operator,
50 tons through 89 tons (with luffing or tower attachment),
GROUP 3 BULLDOZERS Bulldozer operator, over 70,000 lbs up
to and including 120,000 lbs , HYDRAULIC CRANE Hydraulic
crane operator, 50 tons through 89 tons (without luffing
or tower attachment), LATTICE BOOM CRANES Lattice Boom
Crane-50 through 89 tons (and less than 150 feet boom),
FORKLIFT Rock Hound Operator, HYDRAULIC HOES-EXCAVATOR
excavator over 80,000 lbs through 130,000 lbs , LOADERS
Loader operator 60,000 and less than 120,000, RUBBER-TIRED
SCRAPERS Scraper Operator, with tandem scrapers,
Self-loading, paddle wheel, auger type, finish and/or 2 or
more units, SHOVEL, DRAGLINE, CLAMSHELL,SKOOPER OPERATOR
Shovel, Dragline, Clamshell operators 3 cu yds but less
than 5 cu yds
GROUP 4 ASPHALT Screed Operator, Asphalt Paver operator
(screeman required), BLADE Blade operator, Blade operator,
finish, Blade operator, externally controlled by
electronic, mechanical hydraulic means, Blade operator,
multi-engine, BULLDOZERS Bulldozer Operator over 20,000
lbs and more than 100 horse up to 70,000 lbs, Drill Cat
Operator, Side-boom Operator, Cable-Plow Operator (any
type), CLEARING Log Skidders, Chippers, Incinerator, Stump
Splitter (loader mounted or similar type), Stump Grinder
(loader mounted or similar type, Tub Grinder, Land Clearing
Machine (Track mounted forestry mowing & grinding machine),
Hydro Axe (loader mounted or similar type), COMPACTORS
SELF-PROPELLED Compactor Operator, with blade, Compactor
Operator, multi-engine, Compactor Operator, robotic,
CONCRETE Mixer Mobile Operator, Screed Operator, Concrete
Cooling Machine Operator, Concrete Paving Road Mixer,
Concrete Breaker, Reinforced Tank Banding Machine (K-17 or
Page 19 of 39
� http //www wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013
Page 20 of 39
similar types), Laser Screed, CRANE Chicago boom and
similar types, Lift Slab Machine Operator, Boom type
lifting device, 5 ton capacity or less, Hoist Operator, two
(2) drum, Hoist Operator, three (3) or more drums, Derrick
Operator, under 100 ton, Hoist Operator, stiff leg, guy
derrick or similar type, 50 ton and over, Cableway Operator
up to twenty (25) ton, Bridge Crane Operator, Locomotive,
Gantry, Overhead, Cherry Picker or similar type crane,
Carry Deck Operator, Hydraulic Crane Operator, under 50
tons, LATTICE BOOM CRANE OPERATOR Lattice Boom Crane
Operator, under 50 tons, CRUSHER Generator Operator,
Diesel-Electric Engineer, Grizzley Operator, Drill Doctor,
Boring Machine Operator, Driller-Percussion, Diamond, Core,
Cable, Rotary and similar type, Cat Drill (John Henry),
Directional Drill Operator over 20,000 lbs pullback,
FLOATING EQUIPMENT Diesel-electric Engineer, Jack
Operator, elevating barges, Barge Operator, self-
unloading, PYledriver Operator (not crane type) (Deckhand
required), Floating Clamshelll, etc Operator, under 3 cu
yds (Fireman or Diesel-Electric Engineer required),
Floating Crane (derrick barge) Operator, less than 30 tons,
GENERATORS Generator Operator, Diesel-electric Engineer,
GUARDRAIL EQUIPMENT Guardrail Punch Operator (all types),
Guardrail Auger Operator (all types), Combination Guardrail
machines, i e, punch auger, etc , HEATING PLANT Surface
Heater and Planer Operator, HYDRAULIC HOES EXCAVATOR
Robotic Hydraulic backhoe operator, track and wheel type up
to and including 20,0000 lbs with any or all attachments,
Excavator OperaLor over 20,000 lbs through 80,000 lbs ,
LOADERS Belt Loaders, Kolman and Ko Cal types, Loaders
Operator, front end and overhead, 25,000 lbs and less than
60,000 lbs, Elevating Grader Operator by Tractor operator,
Sierra, Euclid or similar types, PILEDRIVERS Hammer
Operator, Piledriver Operator (not crane type), PIPELINE,
SEWER WATER -Pipe Cleaning Machine-Operator, Pipe Doping
Machine Operator, Pipe Bending Machine Operator, Pipe
Wrapping Machine Operator, Boring Machine Operator, Back
Filling Machine Operator, REMOTE CONTROL Concrete Cleaning
Decontamination Machine Operator, Ultra High Pressure Water
Jet Cutting Tool System Operator/Mechanic, Vacuum Blasting
Machine Operator/mechanic, REPATRMEN, HEAVY DUTY Diesel
Electric Enqineer (Plant or Floating, Bolt Threading
Machine operator, Drill Doctor (Bit Grinder), H D
Mechanic, Machine Tool Operator, RUBBER-TIRED SCRAPERS
Rubber-tired Scraper Operator,single engine, single
scraper, Self-loading, paddle wheel, auger type under 15
cu yds , Rubber-tired Scraper Operator, twin engine,
Rubber-tired Scraper Operator, with push- ull attachments,
Self Loading, paddle wheel, auger type 15 cu yds and
over, single engine, Water pulls, water wagons, SHOVEL,
DRAGLINE, CLAMSHELL, SKOOPER OPERATOR Diesel Electric
Engineer, Stationay Drag Scraper Operator, Shovel,
Dragline, Clamshell, Operator under 3 cy yds , Grade-all
Operator, SURFACE (BASE) MATERIAL Blade mounted spreaders,
Ulrich and similar types, TRACTOR-RUBBERED TIRED Tractor
operator, rubber-tired, over 50 hp flywheel, Tractor
operator, with boom attachment, Rubber-tired dozers and
pushers (Michigan, Cat, Hough type), Skip Loader, Drag Box,
TRENCHING MACHINE Trenching Machine operator, digging
capacity over 3 ft depth, Back filling machine operator,
http //www wdol gov/wdoUsca�les/davisbacon/wal dvb 9/12/2013
�
�
�
�
�
�
I �
�
'
�
�
�
�
�
�
�
L__1
�
�
TUNNEL Mucking machine operator
GROUP 5 ASPHALT Extrusion Machine Operator, Roller
Operator (any asphalt mix), Asphalt Burner and
Reconditioner Operator (any type), Roto-Mill, pavement
profiler, ground man, BULLDOZERS Bulldozer operator,
20,000 lbs or less or 100 horse or less, COMPRESSORS
Compressor Operator (any power), over 1,250 cu ft total
capacity, COMPACTORS Compactor Operator, including
vibratory, Wagner Pactor Operator or similar type (without
blade), CONCRETE Combination mixer and Compressor
Operator, gunite work, Concrete Batch Plant Quality Control
Operator, Beltcrete Operator, Pumperete Operator (any
type), Pavement Grinder and/or Grooving Machine Operator
(riding type�, Cement Pump Operator, Fuller-Kenyon and
similar, Concrete Pump Operator, Grouting Machine Operator,
Concrete mixer operator, single drum, under (5) bag
capacity, Cast in place pipe laying machine, maginnis
Internal Full slab vibrator operator, Concrete finishing
mahine operator, Clary, Johnson, Bidwell, Burgess Bridge
deck or similar type, Curb Machine Operator, mechanical
Berm, Curb and/or Curb and Gutter, Concrete Joint Machine
Operator, Concrete Planer Operator, Tower Mobile Operator,
Power Jumbo Operator setting slip forms in tunnels, Slip
Form Pumps, power driven hydraulic lifting device for
concrete forms, Concrete Paving Machine Operator, Concrete
Finishing Machine Operator, Concrete Spreader Operator,
CRANE Helicopter Hoist Operator, Hoist Operator, single
drum, Elevator Operator, A-frame Truck Operator, Double
drum, Boom Truck Operator, HYDRAULIC CRANE OPERATOR
Hydraulic Boom Truck, Pittman, DRILLING Churm Drill and
Earth Boring Machine Operator, Vacuum Truck, Directional
Drill Operator over 2D,000 lbs pullback, FLOATING
EQUIPMENT Fireman, FORKLIFT Fork Lift, over 10 ton and/or
robotic, HYDRAULIC HOES EXCAVATORS Hydraulic Backhoe
Operator, wheel type (Ford, John Deere, Case type),
Hydraulic Backhoe Operator track type up to and including
20,000 lbs , LOADERS Loaders, rubber- tired type, less
than 25,000 lbs, Elevating Grader Operator, Tractor Towed
requiring �perator or Grader, Elevating loader operator,
Athey and similar types, OILERS Service oiler (Greaser),
PIPELINE-SEWER WATER Hydra hammer or simialr types,
Pavement Breaker Operator, PUMPS Pump Operator, more than
5(any size), Pot Rammer Operator, RAILROAD EQUIPMENT
Locomotive Operator, under 40 tons, Ballast Regulator
Operator, Ballast Tamper Multi-Purpose Operator, Track
Liner Operator, Tie Spacer Operator, Shuttle Car Operator,
Locomotive Operator, 40 tons and over, MATERIAL HAULRS Cat
wagon DJBs Volvo similar types, Conveyored material hauler,
SURFACING (BASE) MATERIAL Rock Spreaders, self-propelled,
Pulva-rnixer or similar types, Chiip Spreading machine
operator, Lime spreading operator, construction �ob siter,
SWEEPERS Sweeper operator (Wayne type) self-propelled
construction �ob site, TRACTOR-RUBBER TIRED Tractor
operator, rubber-tired, 50 hp flywheel and under, Trenching
machine operator, maximum digging capacity 3 ft depth,
TUNNEL Dinkey
GROUP 6 ASPHALT Plant Oiler, Plant Fireman, Pugmill
Operator (any type), Truck mounted asphalt spreader, with
Page 21 of 39
r http //www wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013
Page 22 of 39
screed, COMPRESSORS Compressor Operator (any power), under
1,250 cu ft total capacity, CONCRETE Plant Oiler,
Assistant Conveyor Operator, Conveyor Operator, Mixer Box
Operator (C T B, dry batch, etc ), Cement Hog Operator,
Concrete Saw Operator, Concrete Curing Machine Operator
(riding type}, Wire Mat or Brooming Machine Operator,
CRANE Oiler, Fireman, all equipment, Truck Crane Oiler
Driver, A-frame Truck Operator, single drum, Tugger or
Coffin Type Hoist Operator, CRUSHER Crusher Oiler, Crusher
Feederman, CRUSHER Crusher oiler, Crusher feederman,
DRILLING Drill Tender, Auger Oiler, FLOATING EQUIPMENT
Deckhand, Boatman, FORKLIFT Self-propelled Scaffolding
Operator, construction �ob site (exclduing working
platform), Fork Lift or Lumber Stacker Operator,
construction �ob site, Ross Carrier Operator, construction
�ob site, Lull Hi-Lift Operator or Similar Type, GUARDRAIL
EQUIPMENT Oiler, Auger Oiler, piler, combination guardrail
machines, Guardrail Punch Oiler, HEATING PLANT Temporary
Heating Plant Operator, LOADERS Bobcat, skid steer (less
than 1 cu yd ), Bucket Elevator Loader Operator,
BarberGreene and similar types, OILERS Oiler, Guardrail
Punch Oiler, Truck Crane Oiler-Driver, Auger Oiler, Grade
Oiler, required to check grade, Grade Checker, Rigger,
PIPELINE-SEWER WATER Tar Pot Fireman, Tar Pot Fireman
(power agitated), PUMPS Pump Operator (any power),
Hydrostatic Pump Operator, RAILROAD EQUIPMENT Brakeman,
Oiler, Swi�chman, Motorman, Ballast Jack Tamper Operator,
SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER, ETC OPERATOR Oiler,
Grade Oiler (required to check grade), Grade Checker,
Fireman, SWEEPER Broom operator, self propelled,
construction 7ob site, SURFACING (BASE) MATERIAL Roller
Operator, grading of base rock (not asphalt), Tamping
Machzne operartor, mechanical, self-propelled, Hydrographic
Seeder Machine Operator, TRENCHING MACHINE Oiler, Grade
Oiler, TUNNEL Conveyor operator, Air filtration equipment
operator
--------------------------------------------------------------
IRON0014-005 07/O1/2013
ADAMS, ASOTIN, BENTON, COLUMBIA, DOUGLAS, FERRY, FRANKLIN,
GARFIELD, GRANT, LINCOLN, OKANOGAN, PEND ORIELLE, SPOKANE,
STEVENS, WALLA WALLA AND WHITMAN COUNTIES
Rates
IRONWORKER
IRON0029-002 07/O1/2013
$ 31 60
------------------------
Fringes
21 35
CLARK, COWLIT2, KLICKITAT, PACIFIC, SKAMANIA, AND WAHKAIKUM
COUNTIES
Rates Fringes
IRONWORKER $ 34 12 21 35
----------------------------------------------------------------
IRON0086-002 07/O1/2013
http //www wdol gov/wdoUscafiles/dav�sbacon/wal dvb 9/12/2013
�
�
�
� �
�
�
�
,
�
�
�
�
�
�
�
�
�
�
YAKIMA, KITTITAS AND CHELAN COUNTIES
Rates Fringes
IRONWORKER $ 31 60 21 35
----------------------------------------------------------------
IRON0086-004 07/O1/2013
CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, IiING, KITSAP, LEWIS,
MASON, PIERCE, SKAGIT, SNOHOMISH, THURSTON, AND WHATCOM COUNTIES
Rates Fringes
IRONWORKER ----------------------
----------- -------
LABO0001-002 06/O1/2013
ZONE 1
Rates Fringes
Laborers
CALLAM, GRAYS HARBOR,
ISLAND, JEFFERSON, KING,
KITSAP, LEWIS, MASON,
PACIFIC (NORTH OF STRAIGHT
LINE MADE BY EXTENDING THE
NORTH BOUNDARY WAHKIAKUM
COUNTY WEST TO THE PACIFIC
OCEAN), PIERCE, SAN JUAN,
SKAGIT, SNOHOMISH,
THURSTON AND WHATCOM
COUNTIES
GROUP 1 $ 22 19 9 85
GROUP 2 $ 25 41 9 85
GROUP 3 $ 31 76 9 85
GROUP 4 $ 32 53 9 85
GROUP 5 $ 33 06 9 85
CHELAN, DOUGLAS (WEST OF
THE 120TH MERIDIAN),
KITTITAS AND YAKIMA
COUNTIES
GROUP 1 $ 18 73 9 85
GROUP 2 $ 21 47 9 85
GROUP 3 $ 23 51 9 85
GROUP 4 $ 24 08 9 85
GROUP 5 $ 24 49 9 85
BASE POINTS BELLINGHAM, MT VERNON, EVERETT, SEATTLE, KENT,
TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT
TOWNSEND, PT ANGELES, AND BREMERTON
ZONE 1- Pro�ects within 25 radius miles of the respective
city hall
ZONE 2- More than 25 but less than 45 radius miles from the
respective city hall
20NE 3- More than 45 radius miles from the respective city
hall
Page 23 of 39
' http //www wdol gov/wdoUscaf'iles/davisbacon/wal dvb 9/12/2013
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES)
ZONE 2 - $1 00
ZONE 3 - $1 30
BASE POINTS CHELAN, SUNNYSIDE, WENATCHEE, AND YAKIMA
ZONE 1- Pro�ects within 25 radius miles of the respective
city hall
ZONE 2- More than 25 radius miles from the respective city
hall
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES)
ZONE 2 - $2 25
LABORERS CLASSIFICATIONS
GROUP 1 Landscaping and Planting, Watchman, Window
Washer/Cleaner (detail clean-up, such as but not limited to
cleaning floors, ceilings, walls, windows, etc , prior to
final acceptance by the owner)
GROUP 2 Batch Weighman, Crusher Feeder, Fence Laborer,
Flagman, Pilot Car
GROUP 3 General Laborer, Air, Gas, or Electric Vibrating
Screed, Asbestos Abatement Laborer, Ballast Regulator
Machine, Brush Cutter, Brush Hog Feeder, Burner, Carpenter
Tender, Cement Finisher Tender, Change House or Dry Shack,
Chipping Gun (under 30 lbs ), Choker Setter, Chuck Tender,
Clean-up Laborer, Concrete Form Stripper, Curing Laborer,
Demolition (wrecking and moving including charred
material), Ditch Digger, Dump Person, Fine Graders,
Firewatch, Form Setter, Gabian Basket Builders, Grout
- Machine-Tender-, Grinders, Guardrail Erector, Hazardous
Waste Worker (Level C uses a chemical "splash suit" and
air purifying respirator), Maintenance Person, Material
Yard Person, Pot Tender, Rip Rap Person, Riggers, Scale
Person, Sloper Sprayer, Signal Person, Stock Piler, Stake
Hopper, Toolroom Man (at �ob site), Topper-Tailer, Track
Laborer, Truck Spotter, Vinyl Seamer
GROUP 4 Cement Dumper-Paving, Chipping Gun (over 30 lbs ),
Clary Power Spreader, Concrete Dumper/Chute Operator,
Concrete Saw Operator, Drill Operator (hydraulic, diamond,
aiartrac), Faller and Bucker Chain Saw, Grade Checker and
Transit Person, 6routmen (pressure) including post tension
beams, Hazardous Waste Worker (Level B uses same
respirator protection as Level A A supplied air line is
provided in con7unction with a chemical "splash suit"),
High Scaler, Jackhammer, Laserbeam Operator, Manhole
Builder-Mudman, Nozzleman (concrete pump, green cutter when
using combination of high pressure air and water on
concrete and rock, sandblast, gunite, shotcrete, water
blaster, vacuum blaster), Pavement Breaker, Pipe Layer and
Caulker, Pipe Pot Tender, Pipe Reliner (not insert type),
Pipe Wrapper, Power Jacks, Railroad Spike Puller-Power,
Raker-Asphalt, Rivet Buster, Rodder, Sloper (over 20 ft),
Spreader (concrete), Tamper and Similar electric, air and
glas operated tool, Timber Person-sewer (lagger shorer and
Page 24 of 39
�
��
�� �
�
�
,
�
�
�
�
�
�
�
L_.I
�
�
�
�
http //www wdol gov/wdoVscaf'iles/davisbacon/wal dvb 9/12/2013 t
Page 25 of 39
r
� cribber), Track Liner Power, Tugger Operator, Vibrator,
Well Point Laborer
� GROUP 5 Caisson Worker, Miner, Mortarman and Hodcarrier,
Powderman, Re-Timberman, Hazardous Waste Worker (Level A
utilizes a fully encapsulated suit with a self-contained
breathing apparatus or a supplied air line)
� ------------------------------------------------------------
LAB00238-004 06/O1/2013
C�
�
�
�
�
r
PASCO AREA ADAMS, BENTON, COLUMBIA,DOUGLAS (East of 120th
Meridian), FERRY, FRANKLIN, GRANT, OKANOGAN, WALLA WALLA
SPOKANE AREA ASOTIN, GARFIELD, LINCOLN, PEND OREILLE, SPOKANE,
STEVENS & WHITMAN COUNTIES
LABORER (PASCO)
GROUP 1
GROUP 2
GROUP 3
GROUP 4
GROUP 5
LABORER (SPOKANE)
GROUP 1
GROUP 2
GROUP 3
GROUP 4
GROUP 5
Rates
$ 22 00
$ 24 10
$ 24 37
$ 24 64
$ 24 92
$ 21 70
$ 23 80
$ 24 07
$ 24 34
$ 24 62
� Zone Differential (Add to Zone 1 rate)
BASE POINTS Spokane, Pasco, Lewiston
�
��
LJ
�
�
�
�
$2 00
Fringes
10 65
10 65
10 65
10 65
10 65
10 65
10 65
10 65
10 65
10 65
Zone 1 0-45 radius miles from the main post office
Zone 2 45 radius miles and over from the main post office
LABORERS CLASSIFICATIONS
GROUP 1 Flagman, Landscape Laborer, Scaleman, Traffic
Control Maintenance Laborer (to include erection and
maintenance of barricades, signs and relief of flagperson),
Window Washer/Cleaner (detail cleanup, such as, but not
lirnited to cleaning floors, ceilings, walls, windows, etc
prior to final acceptance by the owner)
GROUP 2 Asbestos Abatement Worker, Brush Hog Feeder,
Carpenter Tender, Cement Handler, Clean-up Laborer,
Concrete Crewman (to include stripping of forms, hand
operating 7acks on slip form construction, application of
concrete curing compounds, pumperete machine, signaling,
handling the nozzle of squeezcrete or similar machine,6
inches and smaller), Confined Space Attendant, Concrete
Signalman, Crusher Feeder, Demolition (to include clean-up,
burning, loading, wreckinq and salvage of all material),
Dumpman, Fence Erector, Firewatch, Form Cleaning Machine
, http //www wdol gov/wdoUsc�les/davisbacon/wal dvb � 9/12/2013
Feeder, Stacker, General Laborer, Grout Machine Header
Tender, Guard Rail (to include guard rails, guide and
reference posts, sign posts, and right-of-way markers),
Hazardous Waste Worker, Level D(no respirator is used and
skin protection is minimal), Miner, Class "A" (to include
all bull gang, concrete crewman, dumpman and pumperete
crewman, including distributing pipe, assembly & dismantle,
and nipper), Nzpper, Riprap Man, Sandblast Tailhoseman,
Scaffold Erector (wood or steel), Stake Jumper, Structural
Mover (to include separating foundation, preparation,
cribbing, shoring, �acking and unloading of structures),
Tailhoseman (water nozzle), Timber Bucker and Faller (by
hand), Track Laborer (RR), Truck Loader, Well-Point Man,
All Other Work Classifications Not Specially Listed Shall
Be Classified As General Laborer
GROUP 3 Aspahlt Raker, Asphalt Roller, walking, Cement
Finisher Tender, Concrete Saw, walking, Demolition Torch,
Dope Pot Firemen, non-mechanical, Driller Tender (when
required to move and position machine), Form Setter,
Paving, Grade Checker using level, Hazardous Waste Worker,
Level C(uses a chemical "splash suit" and air purifying
respirator), Jackhammer Operator, Miner, Class "B" (to
include brakeman, finisher, vibrator, form setter),
Nozzleman (to include squeeze and flo-crete nozzle),
Nozzleman, water, air or steam, Pavement Breaker (under 90
lbs ), Pipelayer, corrugated metal culvert, Pipelayer,
multi- plate, Pot Tender, Power Buggy Operator, Power Tool
Operator, gas, electric, pneumatic, Railroad Equipment,
power driven, except dual mobile power spiker or puller,
Railroad Power Spiker or Puller, dual mobile, Rodder and
Spreader, Tamper (to include operation of Barco, Essex and
similar tampers), Trencher, Shawnee, Tugger Operator, Wagon
Drills, Water Pipe Liner, Wheelbarrow (power driven)
GROUP 4 Air and Hydraulic Track Drzll, Brush Machine (to
include horizontal construction 7oint cleanup brush
machine, power propelled), Caisson Worker, free air, Chain
Saw Operator and Faller, Concrete Stack (to include
laborers when laborers working on free standing concrete
stacks for smoke or fume control above 40 feet high),
Gunite (to include operation of machine and nozzle),
Hazardous Waste Worker, Level B(uses same respirator
protection as Level A A supplied air line is provided in
con�unction with a chemical "splash suit High Scaler,
Laser Beam Operator (to include grade checker and elevation
control), Miner, Class C(to include miner, nozzleman for
concrete, laser beam operator and rigger on tunnels),
Monitor Operator (air track or similar mounting), Mortar
Mixer, Nozzleman (to include �et blasting nozzleman, over
1,200 lbs , �et blast machine power propelled, sandblast
nozzle), Pavement Breaker (90 lbs and over), Pipelayer (to
include working topman, caulker, collarman, �ointer,
mortarman, rigger, 7acker, shorer, valve or meter
installer), Pipewrapper, Plasterer Tender, Vibrators (all)
GROUP 5- Drills with Dual Masts, Hazardous Waste Worker,
Level A(utilizes a fully encapsulated suit with a
self-contained breathing apparatus or a supplied air line),
Miner Class "D", (to include raise and shaft miner, laser
Page 26 of 39
�
�
�
�
�
�
I L �
�
��
V
�
L._.J
�
�
LJ
�
�
�
�
http //www wdol gov/wdoUscaf'iles/davisbacon/wal dvb 9/12/2013 �
�
r
'
�
�
'
�
�
�
�
�
�
�
�J
�
�
beam operator on riases and shafts)
GROUP 6 - Powderman
LAB00238-006 06/O1/2013
COUNTIES EAST OF THE 120TH MERIDIAN ADAMS, ASOTIN, BENTON,
CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT,
LINCOLN, OKANOGAN, PEND OREILLE, STEVENS, SPOKANE, WALLA WALLA,
WHITMAN
Rates Fringes
Hod Carrier______________________$
LAB00335-001 06/O1/2013
CLARK, COWLITZ, KLICKITAT, PACIFIC (SOUTH OF A STRAIGHT LINE
MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKZAKUM COUNTY
WEST TO THE PACIFIC OCEAN), SKAMANIA AND WAHKIAKUM COUNTIES
Rates Fringes
Laborers
ZONE 1
GROUP 1 $ 28 65 10 05
GROUP 2 $ 29 25 10 05
GROUP 3 $ 29 69 10 05
GROUP 4 $ 30 07 10 05
GROUP 5 S 26 15 10 05
GROUP 6 $ 23 73 10 05
GROUP 7 $ 20 53 10 05
Zone Differential (Add to Zone 1 rates)
Zone 2 $ 0 65
Zone 3 - 1 15
Zone 4 - 1 70
Zone 5 - 2 75
BASE POINTS GOLDENDALE, LONGVIEW, AND VANCOUVER
ZONE 1 Pro�ects within 30 miles of the respective city all
ZONE 2 More than 30 miles but less than 40 miles from the
respective city hall
ZONE 3 More than 40 miles but less than 50 miles from the
respective city hall
ZONE 4 More than 50 miles but less than 80 miles from the
respective city hall
ZONE 5 More than 80 miles from the respective city hall
LABORERS CLASSIFICATIONS
� GROUP 1 Asphalt Plant Laborers, Asphalt Spreaders, Batch
Weighman, Broomers, Brush Burners and Cutters, Car and
Truck Loaders, Carpenter Tender, Change-House Man or Dry
� Shack Man, Choker Setter, Clean-up Laborers, Curing,
' http //www wdol gov/wdoUscafiles/davisbacon/wal dvb
Page 27 of 39
9/12/2013
Concrete, Demolition, Wrecking and Moving Laborers,
Dumpers, road oiling crew, Dumpmen (for grading crew),
Elevator Feeders, Median Rail Reference Post, Guide Post,
Right of Way Marker, Fine Graders, Fire Watch, Form
Strippers (not swinging stages), General Laborers,
Hazardous Waste Worker, Leverman or Aggregate Spreader
(Flaherty and similar types), Loading Spotters, Material
Yard Man (including electrical), Pittsburgh Chipper
Operator or Similar Types, Railroad Track Laborers, Ribbon
Setters (including steel forms), Rip Rap Man (hand placed),
Road Pump Tender, Sewer Labor, Signalman, Skipman, Slopers,
Spraymen, Stake Chaser, Stockpiler, Tie Back Shoring,
Timber Faller and Bucker (hand labor), Toolroom Man (at �ob
site), Tunnel Bullgang (above ground), Weight-Man- Crusher
(aggregate when used)
GROUP 2 Applicator (including pot power tender for same),
applying protective material by hand or nozzle on utility
lines or storage tanks on pro�ect, Brush Cutters (power
saw), Burners, Choker Splicer, Clary Power Spreader and
similar types, Clean- up Nozzleman-Green Cutter (concrete,
rock, etc ), Concrete Power Buggyman, Concrete Laborer,
Crusher Feeder, Demolition and Wrecking Charred Materials,
Gunite Nozzleman Tender, Gunite or Sand Blasting Pot
Tender, Handlers or Mixers of all Materials of an
irritating nature (including cement and lime), Tool
Operators (includes but not limited to Dry Pack Machine,
Jackhammer, Chipping Guns, Paving Breakers), Pipe Doping
and Wrapping, Post Hole Digger, air, gas or electric,
Vibrating Screed, Tampers, Sand Blasting (Wet),
Stake-Setter, Tunnel-Muckers, Brakemen, Concrete Crew,
Bullgang (underground)
GROUP 3 Asbestos Removal, Bit Grinder, Drill Doctor, Drill
Operators, air tracks, cat drills, wagon drills,
rubber-mounted drills, and other similar types including at
crusher plants, Gunite Nozzleman, High Scalers, Strippers
and Drillers (covers work in swinging stages, chairs or
belts, under extreme conditions unusual to normal drilling,
blasting, barring-down, or sloping and stripping), Manhole
Builder, Powdermen, Concrete Saw Operator, Pwdermen, Power
Saw Operators (Bucking and Falling), Pumperete Nozzlemen,
Sand Blasting (Dry), Sewer Timberman, Track Liners, Anchor
Machines, Ballast Regulators, Multiple Tampers, Power
Jacks, Tugger Operator, Tunnel-Chuck Tenders, Nippers and
Timbermen, Vibrator, Water Blaster
GROUP 4 Asphalt Raker, Concrete Saw Operator (walls),
Concrete Nozzelman, Grade Checker, Pipelayer, Laser Beam
(pipelaying)-applicable when employee assigned to move, set
up, align, Laser Beam, Tunnel Miners, Motorman-Dinky
Locomotive-Tunnel, Powderman-Tunnel, Shield Operator-Tunnel
GROUP 5 Traffic Flaggers
GROUP 6 Fence Builders
GROUP 7 Landscaping or Planting Laborers
------------------------------------------------------------
http //www wdol gov/wdoUscafiles/davisbacon/wal dvb
Page 28 of 39
9/12/2013
�
�
� I
�
�
,
�
LJ
�
U
�
�
�
�
�
'
�
�
�
�
,
� LAB00335-019 06/O1/2012
Rates Fr�nges
� Hod_Carrier ---------------------- S_30 - 30 --_-_---_-_-_ 9 - 7 0
PAIN0005-002 07/O1/2013
� STATEWIDE EXCEPT CLARK, COWLITZ, KLICKITAT, PACIFIC (SOUTH),
SKAMANIA, AND WAHKIAKUM COIINTIES
�
�
�
'
�
�
� J
�
1
�
�
1
Rates Fringes
Painters
-_-_- 28 00 14 33
------------------------------
PAIN0005-004 03/O1/2009
CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS,
MASON, PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND
WHATCOM COUNTIES
Rates Fringes
PAINTER -------------------------$-20_82--------------�-44-------
* PAIN0005-006 07/O1/2013
ADAMS, ASOTIN, BENTON AND FRANKLIN (EXCEPT HANFORD SITE),
CHELAN, COLUMBIA, DOUGLAS, FERRY, GARFIELD, GRANT, KITTITAS,
LINCOLN, OKANOGAN, PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA,
WHITMAN AND YAKIMA COUNTIES
Rates Fringes
Painters
Application of Cold Tar
Products, Epoxies, Polyure
thanes, Acids, Radiation
Resistant Material, Water
and Sandblasting $ 26 79 10 41
Over 30'/Swing Stage Work $ 22 20 7 98
Brush, Roller, Striping,
Steam-cleaning and Spray $ 21 69 10 41
Lead Abatement, Asbestos
Abatement $ 21 50 7 98
*$ 70 shall be paid over and above the basic wage rates
listed for work on swing stages and high work of over 30
feet
----------------------------------------------------------------
� PAIN0055-002 07/O1/2013
CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM
COUNTIES
�
, http //www wdol gov/wdoUscafiles/davisbacon/wal dvb
Page 29 of 39
9/12/2013
Page 30 of 39
Rates Fringes
Painters
Brush & Roller $ 21 01 8 83
High work - All work 60
ft or higher $ 21 61 8 83
Spray and Sandblasting $ 21 76 S 83
----------------------------------------------------------------
PAIN0055-007 07/O1/2013
CLARK, COWLITZ, KLICKITAT, SKAMANIA and WAHKIAKUM COUNTIES
Rates Fringes
Painters
HIGHWAY & PARKING LOT
STRIPER $ 33 41 10 36
----------------------------------------------------------------
PLAS0072-004 06/01/2013
ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY,
FRANKLIN, GARFIELD, GRANT, KITTITAS, LINCOLN, OKANOGAN, PEND
OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN, AND YAKIMA
COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
ZONE 1 $ 26 01 12 14
Zone Differential (Add to Zone 1 rate) Zone 2-$2 00
BASE POINTS Spokane, Pasco, Lewiston, Wenatchee
Zone 1 0- 45 radius miles from the main post office
Zone 2 Over 45 radius miles from the main post office
----------------------------------------------------------------
PLAS0528-001 06/O1/2013
CLALLAM, COWLITZ, GRAYS HARBOR, ISLAND, JEFFERSON, KING,
KITSAP, LEWIS, MASON, PACIFIC, PIERCE, SAN JUAN, SKAGIT,
SNOHOMISH, THURSTON, WAHKIAKUM AND WHATCOM COUNTIES
Rates Fringes
Cement Masons
CEMENT MASON $ 36 63 14 55
COMPOSITION, TROWEL
MACHINE, GRINDER, POWER
TOOLS, GUNNITE NOZZLE $ 37 13 14 55
TROWLING MACHINE OPERATOR
ON COMPOSITION $ 37 13 14 55
----------------------------------------------------------------
PLAS0555-002 06/O1/2012
CLARK, KLICKITAT AND SKAMANIA COUNTIES
http /lwww wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013
�
� ZONE 1
Rates Fringes
�
r
�J
LJ
�
'
C
�
,
LJ
'
�
�
�
�
'
Cement Masons
CEMENT MASONS DOING BOTH
COMPOSITION/POWER
MACHINERY AND
SUSPENDED/HANGING SCAFFOLD $ 30 58 17 76
CEMENT MASONS ON
SUSPENDED, SWINGING AND/OR
HANGING SCAFFOLD $ 30 58 17 76
CEMENT MASONS $ 29 98 17 76
COMPOSITION WORKERS AND
POWER MACHINERY OPERATORS $ 31 18 17 76
Zone Differential (Add To Zone 1 Rates)
Zone 2 - $0 65
Zone 3 - 1 15
Zone 4 - 1 70
Zone 5 - 3 00
BASE POINTS BEND, CORVALLIS, EUGENE, MEDFORD, PORTLAND,
SALEM, THE DALLES, VANCOUVER
ZONE 1 Pro�ects within 30 miles of the respective city hall
ZONE 2 More than 30 miles but less than 40 miles from the
respective city hall
ZONE 3 More than 40 miles but less than 50 miles from the
respective city hall
ZONE 4 More than 50 miles but less than 80 miles from the
respective city hall
ZONE 5 More than 80 miles from the respective city hall
TEAM0037-002 06/O1/2013
CLARK, COWLITZ, KLICKITAT, PACIFIC (South of a straight line
made by extending the north boundary line of Wahkiakum County
west to the Pacific Ocean), SKAMANIA, AND WAHKIAKUM COUNTIES
Rates
Truck drivers
ZONE 1
GROUP 1 $ 26 90
GROUP 2 $ 27 02
GROUP 3 $ 27 15
GROUP 4 $ 27 41
GROUP 5 $ 27 63
GROUP 6 $ 27 79
GROUP 7 $ 27 99
Zone Differential (Add to Zone 1 Rates)
Zone 2 - $0 65
Zone 3 - 1 15
Zone 4 - 1 70
Zone 5 - 2 75
Fringes
13 75
13 75
13 75
13 75
13 75
13 75
13 75
Page 31 of 39
' http /iwww wdol gov/wdoUscaf'iles/davisbacon/wal dvb 9/12/2013
BASE POINTS ASTORIA, THE DALLES, LONGVIEW AND VANCOUVER
ZONE 1 Pro�ects within 30 miles of the respective city
hall
ZONE 2 More than 30 miles but less than 40 miles from the
respective city hall
ZONE 3 More than 40 miles but less than 50 miles from the
respective city hall
ZONE 4 More than 50 miles but less than 80 miles from the
respective city hall
ZONE 5 More than 80 miles from the respective city hall
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1 A Frame or Hydra lifrt truck w/load bearing
surface, Articulated Dump Truck, Battery Rebuilders, Bus or
Manhaul Driver, Concrete Buggies (power operated), Concrete
Pump Truck, Dump Trucks, side, end and bottom dumps,
including Semi Trucks and Trains or combinations there of
up to and including 10 cu yds , Lift Jitneys, Fork Lifts
(all sizes in loading, unloading and transporting material
on �ob site), Loader and/or Leverman on Concrete Dry Batch
Plant (manually operated), Pilot Car, Pickup Truck, Solo
Flat Bed and misc Body Trucks, 0-10 tons, Truck Tender,
Truck Mechanic Lender, Water Wagons (rated capacity) up to
3,000 gallons, Transit Mix and Wet or Dry Mix - 5 cu yds
and under, Lubrication Man, Fuel Truck Driver, Tireman,
Wash Rack, Steam Cleaner or combinations, Team Driver,
Slurry Truck Driver or Leverman, Tireman
GROUP 2 Boom Truck/Hydra-lift or Retracting Crane,
Challenger, Dumpsters or similar equipment all sizes, Dump
Trucks/Articulated Dumps 6 cu to 10 cu , Flaherty Spreader
Driver or Leverman, Lowbed Equipment, Flat Bed Semi-trailer
or doubles transporting equipment or wet or dry materials,
Lumber Carrier, Driver-Straddle Carrier (used in loading,
unloading and transporting of materials on �ob site), Oil
Distributor Driver or Leverman, Transit mix and wet or dry
mix trcuks over 5 cu yds and including 7 cu yds ,
Vacuum Trucks, Water truck/Wagons (rated capacity) over
3,000 to 5,000 gallons
GROUP 3 Ammonia Nitrate Distributor Driver, Dump trucks,
side, end and bottom dumps, including Semi Trucks and
Trains or combinations thereof over 10 cu yds and
includinq 30 cu yds includes Articulated Dump Trucks,
Self-Propelled Street Sweeper, Transit mix and wet or dry
mix truck over 7 cu yds and including 11 cu yds , Truck
Mechanic-Welder-Body Repairman, Qtility and Clean-up Truck,
Water Wagons (rated capacity) over 5,000 to 10,000 gallons
GROUP 4 Asphalt Burner, Dump Trucks, side, end and bottom
cumps, including Semi-Trucks and Trains or combinations
thereof over 30 cu yds and including 50 cu yds
includes Articulated Dump Trucks, Fire Guard, Transit Mix
and Wet or Dry Mix Trucks, over 11 cu yds and including
Page 32 of 39
'i�
�
�
�
�
1
�
,
�
LJ
�
�
,
�
��
�
�
�
http //www wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013 '
�
, 15 cu yds , Water Wagon (rated capacity) over 10,00d
gallons to 15,000 gallons
' GROUP 5 Composite Crewman, Dump Trucks, side, end and
bottorn dumps, including Semi Trucks and Trains or
combinations thereof over 50 cu yds and including 60 cu
yds includes Articulated Dump Trucks
C �
�
GROUP 6 Bulk Cement Spreader w/o Auger, Dry Pre-Batch
concrete Mix Trucks, Dump trucks, side, end and bottom
dumps, including Semi Trucks and Trains of combinations
thereof over 60 cu yds and including 80 cu yds , and
includes Articulated Dump Trucks, Skid Truck
' GROUP 7 Dump Trucks, side, end and bottom dumps, including
Semi Trucks and Trains or combinations thereof over 80 cu
yds and including 100 cu yds , includes Articulated Dump
Trucks, Industrial Lift Truck (mechanical tailgate)
� ------------------------------------------------------------
* TEAM0174-001 06/29/2012
�
�
�
'
�
1
'i I
u
CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS,
MASON, PACIFIC (North of a straight line made by extending the
north boundary line of Wahkiakum County west to the Pacific
Ocean), PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND
WHATCOM COUNTIES
Truck drivers
ZONE A
GROUP 1
GROUP 2
GROUP 3
GROUP 4
GROUP 5
Rates
Fringes
16 23
16 23
16 23
16 23
16 23
$ 31 68
$ 30 84
$ 28 03
$ 23 06
$ 31 23
ZONE B(25-45 miles from center of listed cities*) Add $ 70
per hour to Zone A rates
ZONE C(over 45 miles from centr of listed cities*) Add
$1 00 per hour to Zone A rates
*Zone pay will be calculated from the city center of the
following listed cities
BELLINGHAM CENTRALIA
� EVERETT SHELTON
SEATTLE PORT ANGELES
TACOMA PORT TOWNSEND
'�J
L _I
J
RAYMOND OLYMPIA
ANACORTES BELLEVUE
MT VERNON KENT
ABERDEEN BREMERTON
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1-"A-frame or Hydralift" trucks and Boom trucks or
similar equipment when "A" frame or "Hydralift" and Boom
truck or similar equipment is used, Buggymobile, Bulk
Cement Tanker, Dumpsters and similar equipment,
Tournorockers, Tournowagon, Tournotrailer, Cat DW series,
Terra Cobra, Le Tourneau, Westinghouse, Athye Wagon, Euclid
Page 33 of 39
,
, http //www wdol govlwdoUscafiles/davisbacon/wal dvb 9/12/2013
Two and Four-Wheeled power tractor with trailer and similar
top-loaded equipment transporting material Dump Trucks,
side, end and bottom dump, including semi-trucks and trains
or combinations thereof with 16 yards to 30 yards capacity
Over 30 yards $ 15 per hour additional for each 10 yard
increment, Explosive Truck (field mix) and similar
equipment, Hyster Operators (handling bulk loose
aggregates), Lowbed and Heavy Duty Trailer, Road Oil
Distributor Driver, Spreader, Flaherty Transit mix used
exclusively in heavy construction, Water Wagon and Tank
Truck-3,000 gallons and over capacity
GROUP 2- Bulllifts, or similar equipment used in loading or
unloading trucks, transporting materials on �ob site,
Dumpsters, and similar equipment, Tournorockers,
Tournowagon, Turnotrailer, Cat D W Series, Terra Cobra,
Le Tourneau, Westinghouse, Athye wagon, Euclid two and
four-wheeled power tractor with trailer and similar
top-loaded equipment transporting material Dump trucks,
side, end and bottom dump, including semi-trucks and trains
or combinations thereof with less than 16 yards capacity,
Flatbed (Dual Rear Axle), Grease Truck, Fuel Truck,
Greaser, Battery Service Man and/or Tire Service Man,
Leverman and loader at bunkers and batch plants, Oil tank
transport, Scissor truck, Slurry Truck, Sno-Go and similar
equipment, Swampers, Straddler Carrier (Ross, Hyster) and
similar equipment, Team Driver, Tractor (small,
rubber-tired)(when used within Teamster �urisdiction),
Vacuum truck, Water Wagon and Tank trucks-less than 3,000
gallons capacity, Winch Truck, Wrecker, Tow truck and
similar equipment
GROUP 3- Flatbed (single rear axle), Pickup Sweeper, Pickup
Truck (Ad�ust Group 3 upward by $2 00 per hour for onsite
work only)
GROUP 4- Escort or Pilot Car
GROUP 5 - Mechanic
HAZMAT PROJECTS
Anyone working on a HAZMAT �ob, where HAZMAT certification
required, shall be compensated as a premium, in addition to
the classification working in as follows
LEVEL C +$ 25 per hour - This level uses an air purifying
respirator or additional protective clothing
LEVEL B +$ 50 per hour - Uses same respirator protection
Level A Supplied air line is provided in con7unction with
a chemical "splash suit "
LEVEL A +$ 75 per hour - This level utilizes a fully-
encapsulated suit with a self-contained breath�ng apparatus
or a supplied air line
is
as
----------------------------------------------------------------
TEAM0690-004 O1/01/2013
ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY,
FRANKLIN, GARFIELD, GRANT KITTITAS, LINCOLN, OKANOGAN, PEND
OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA
Page 34 of 39
�
�
�
�
�
�
�
�
1__J
i
�
�
� J
'
�
�J
L� J
L�
�
http /Jwww wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013 '
'
' COUNTIES
'
l__J
I
�
[_ J
�
�
1
,
L�
�
�
�J
�
1
�
�
Rates Fringes
Truck drivers (AREA 1
SPOKANE ZONE CENTER Adams,
Chelan, Douglas, Ferry,
Grant, Kittitas, Lincoln,
Okanogan, Pen Oreille,
Spokane, Stevens, and Whitman
Counties
AREA 1 LEWISTOAI ZONE CENTER
Asotin, Columbia, and
Garfield Counties
AREA 2 PASCO ZONE CENTER
Benton, Franklin, Walla Walla
and Yakima Counties)
AREA 1
GROUP 1 $ 20 17 14 44
GROUP 2 $ 22 44 14 44
GROUP 3 $ 22 94 14 44
GROUP 4 $ 23 27 14 44
GROUP 5 $ 23 38 14 44
GROUP 6 $ 23 55 14 44
GROUP 7 $ 24 08 14 44
GROUP 8 $ 24 44 14 44
AREA 2
GROUP 1 $ 21 77 14 44
GROUP 2 $ 24 31 14 44
�
GROUP 3 $ 24 42 14 44
GROUP 4 $ 24 75 14 44
GROUP 5 $ 24 86 14 44
GROUP 6 $ 25 02 14 44
GROUP 7 $ 25 56 14 44
GROUP 8 $ 25 88 14 44
Zone Differential (Add to Zone 1 rate Zone 2+$2 00)
BASE POINTS Spokane, Pasco, Lewiston
Zone 1 0-45 radius miles from the main post office
Zone 2 Outside 45 radius miles from the main post office
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1 Escort Driver or Pilot Car, Employee Haul, Power
Boat Hauling Employees or Material
GROUP 2 Fish Truck, Flat Bed Truck, Fork Lift (3000 lbs and
under), Leverperson (loading trucks at bunkers), Trailer
Mounted Hydro Seeder and Mulcher, Seeder & Mulcher,
Stationary Fuel Operator, Tractor (small, rubber-tired,
pullinq trailer or similar equipment)
GROUP 3 Auto Crane (2000 lbs capacity), Buggy Mobile &
Similar, Bulk Cement Tanks & Spreader, Dumptor (6 yds &
under), Flat Bed Truck with Hydraullic System, Fork Lift
Page 35 of 39
� http //www wdol gov/wdoUsc�les/davisbacon/wal dvb 9/12/2013
(3001-16,000 lbs ), Fuel Truck Driver, Steamcleaner &
Washer, Power Operated Sweeper, Rubber-tired Tunnel Jumbo,
Scissors Truck, Slurry Truck Driver, Straddle Carrier
(Ross, Hyster, & similar), Tireperson, Transit Mixers &
Truck Hauling Concrete (3 yd to & including 6 yds ),
Trucks, side, end, bottom & articulated end dump (3 yards
to and including 6 yds ), Warehouseperson (to include
shipping & receiving), Wrecker & Tow Truck
GROUP 4 A-Frame, Burner, Cutter, & Welder, Service Greaser,
Trucks, side, end, bottom & articulated end dump (over 6
yards to and including 12 yds ), Truck Mounted Hydro
Seeder, Warehouseperson, Water Tank truck (0-8,000 gallons)
GROUP 5 Dumptor (over 6 yds ), Lowboy (50 tons & under),
Self- loading Roll Off, Semi-Truck & Trailer, Tractor with
Steer Trailer, Transit Mixers and Trucks Hauling Concrete
(over 6 yds to and including 10 yds ), Trucks, side, end,
bottom and end dump (over 12 yds to & including 20 yds ),
Truck-Mounted Crane (with load bearing surface either
mounted or pulled, up to 14 ton), Vacuum Truck (super
sucker, guzzler, etc )
GROUP 6 Flaherty Spreader Box Driver, Flowboys, Fork Lift
(over 16,000 lbs ), Dumps (Semi-end), Mechanic (Field),
Semi- end Dumps, Transfer Truck & Trailer, Transit Mixers &
Trucks Hauling Concrete (over 10 yds to & including 20
yds ), Trucks, side, end, bottom and articulated end dump
(over 20 yds to & including 40 yds ), Truck and Pup,
Tournarocker, DWs & similar with 2 or more 4 wheel-power
tractor with trailer, gallonage or yardage scale, wh�chever
is greater Water Tank Truck (8,001- 14,000 gallons),
Lowboy(over 50 tons)
GROUP 7 Oil Distributor Driver, Stringer Truck (cable
oeprated trailer), Transit Mixers & Trucks Hauling Concrete
(over 20 yds ), Truck, side, end, bottom end dump (over 40
yds to & including 100 yds ), Truck Mounted Crane (with
load bearing surface either mounted or pulled (16 through
25 tons),
GROUP 8 Prime Movers and Stinger Truck, Trucks, side, end,
bottom and articulated end dump (over 100 yds ), Helicopter
Pilot Hauling Employees or Materials
Footnote A- Anyone working on a HAZMAT �ob, where HAZMAT
certification is required, shall be compensated as a
premium, in additon to the classification working in as
follows
LEVEL C-D -$ 50 PER HOUR (This is the lowest level of
protection This level may use an azr purifying respirator
or additional protective clothing
LEVEL A-B -$1 00 PER HOUR (Uses supplied air is con�unction
with a chemical spash suit or fully encapsulated suit with
a self-contained breathing apparatus
Employees shall be paid Hazmat pay in increments of four(4)
and eight(8) hours
Page 36 of 39
'
u
�
�
I 1
�
C -1
�
�
'
'
�
�
�
�
�
Li
�
�
http //www wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013 '
�
�
�
NOTE
Trucks Pulling Equipment Trailers shall receive $ 15/hour
over applicable truck rate
----------------------------------------------------------------
� WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental
1
'
f�
�J
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5 5 (a) (1) (ii))
----------------------------------------------------------------
� The body of each wage deterrnination lists the classification
and wage rates that have been found to be prevailing for the
� cited type(s) of construction in the area covered by the wage
determination The classifications are listed in alphabetical
� order of "identifiers" that indicate whether the particular
rate is union or non-union
'
1
1
1
�
� I
1
�
�
Union Identifiers
An identifier enclosed in dotted lines beginning with
characters other than "SII" denotes that the union
classification and rate have found to be prevailing for that
classification Example PLUM0198-005 07/O1/2011 The first
four letters , PLUM, indicate the international union and the
four-digit number, 0198, that follows indicates the local union
number or district council number where applicable , i e,
Plumbers Local 0198 The next number, 005 in the example, is
an internal number used in processing the wage determination
The date, 07/O1/2011, following these characters is the
effective date of the most current negotiated rate/collective
bargaining agreement which would be July 1, 2011 an the above
example
Union prevailing wage rates will be updated to reflect any
changes in the collective bargaining agreements governing the
rates
0000/9999 weighted union wage rates will be published annually
each January
Non-Union Identifiers
Classifa.cations listed under an "SU" identifier were derived
from survey data by computing average rates and are not union
rates, however, the data used in camputing these rates may
Page 37 of 39
, http //www wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013
Page 38 of 39
include both union and non-union data Example SULA2004-007
5/13/2010 SU indicates the rates are not union ma�ority rates,
LA indicates the State of Louisiana, 2004 is the year of the
survey, and 007 is an internal number used in producing the
wage determination A 1993 or later date, 5/13/2010, indicates
the classifications and rates under that identifier were issued
as a General Wage Determination on that date
Survey wage rates wall remain in effect and will not change
until a new survey is conducted
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter� This can
be
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted
because those Regional Offices have responsibility for the
Davis-Bacon survey program If the response from this initial
contact is not satisfactory, then the process described in 2)
and 3) should be followed
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations Write to
Branch of Construction Wage Determinations
Wage and Hour Divis�on
U S Department of Labor
200 Constitution Avenue, N W
Washington, DC 20210
2) If the answer to the question in 1) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1 8 and 29 CFR Part 7) Write to
Waqe and Hour Admanistrator
U S Department of Labor
200 Constitution Avenue, N W
Washinqton, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, pro�ect description, area practice material,
etc ) that the requestor considers relevant to the issue
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
http //www wdol govlwdoUscafiles/davisbacon/wal dvb 9/12/2013
�
, Review Board (formerly the Wage Appeals Board) Write to
Administrative Review Board
� U S Department of Labor
200 Constitution Avenue, N W
Washington, DC 20210
� 4) All decisions by the Administrative Review Board are final
� END OF GENERAL DECISION
�
�
�
,
,
,
�
'
'
l_ J
,
�J
�
Page 39 of 39
, http //www wdol gov/wdoUscafiles/davisbacon/wal dvb 9/12/2013
'
�
'
�
Ij
'
i
C�
�
1
1
1
1
1
1
1
1
1
APPENDIX B
CONSTRUCTION FORMS
�
i
� � � � � � � — � � � � � � � � � � �
CITY OF BREMERTOIV
Pro�ect
Contractor Pro�ect No
SHOP DRAWING SUBMITTAL
Submittal No
Date
Resubm�ttal (Y/N)
Prev�ous Subm�ttal No --
To Be Completed by the Cormactor To Be Completed by the Crty
Spec�ficat�on No Make Amend
kem P1C Para / Dwg Copies Except�ons Corrections and Re�ected
No (') Reference Descript�on of Item Sub m Taken Noted Resubmrt Resubm�t
(•) P- Partial Submittal, C- Complete Submrttal
CoMractor mrtial by erther (a) or (b) to certify the following
(a) We have venfied that the mater�al or eqwpment corrtamed �n this submrttal meets all requirements speafied or shown
Ino except�ons)
(b) We have verified that the matenal or eqwpment contamed m th�s submittai meets all reqwrements speafied or shown
except for the followmg dewations (hst deviations)
-
-
Contractors Authorrced Representat�ve
Rev�ew Remarks
Conections or commeMS made relaUve to submtttals dunng th�s review do not rebeve the contractor from Very truly yours
comphance wnh the requirements of the drawmgs and specvHcahons This check is only for rewew of Clty of Bremerton
generel co�rformance wrth the design concept of the pro�ect and general compbance wrth the informaUon Dept of Pubiic Works and Utdrt�es
glven In the cornract documeMS The cont►actor �s respons�ble for conflmung and correlating all quarrt�ties
and d�mens�ons selecting fabncation processes and tachmques of construct�on coordinabng Fus work with
that of other trades and perfomung fns work in a safe and satisfactory manner PIO�BCt Engineer
� r■i � r � � � � � � � � � � � i � r� �
City of Bremerton
Engineering Divisoon
Da�ly Force Account Report Contractor:
Pro�ect Description of Work Page of
Pro�ect No Date
Labor Matenals
Empioyee Strai ht Time OverUme Matenals
Name Class Hours Rate Hours Rate Amount Descn on Quant Unit Urnt Pnce Amount
$o 00 $o 00
$o oa $o 00
$o 00 $o 00
$o 00 $o 00
$o 00 $o 00
$o 00 $o 00
$o 00 $o 00
$0 00 Note Matenals Subtotal $0 00
$0 00 Use Tax (ii� 0% $0 00
SO 00 Matenals Markup @ 15% $0 00
$o 0o Matenals otal 30 00
ote Labor Subtotai $o 0o Subcontracts
Labor Markup @ 20% $0 00 Subcontractor's Name 8
Labor Total $0 00 DescripUon of Subcontracted Work Quant Unit Unrt Pnce Amount
Eqwpment
$o 00
Eqwpment Working Rental OperaUng Standby Standby $0 00
Descn 4on & ID No Hours Rate Cost Hours Rate Amount $0 00
$0 00 $0 00 $0 00
$0 00 $0 00 $0 00
$0 00 $0 00 $0 00
$0 00 $0 00 $0 00
$0 00 $0 00 $0 00
$0 00 $0 0o Note Subcontracts Subtotal $0 00
$0 00 $0 00 Subs Markup @ 5% $0 00
$0 00 $0 00 Subtotal $0 00
$0 00 $0 00 Pnme Cont Markup � 5% $0 00
$0 00 $0 00 Total Subcontracts b0 00
$0 00 $0 00 Labor Total $0 00
$0 00 $0 00 Eqwpment Total $0 00
$0 00 $0 00 Matenals Total $0 00
O e Equipment Subtotal $0 00 Subcontrects Total $0 00
S U M M A R Y s�nto�i $o 00
Equip Markup @ 15°/a $0 00 B/BO/I Markup @ 5% $0 00
Subotal $0 00
WSST � 0% $0 00
Eqwpment Total So 0o Da�ly F A Total 30
Rev 01 Pnnted 9/13/2013 Page 1 of 1
'
'
'
1
'
�
�
�
�
i
1
�
'
�
�
�
�
'
�
CITY OF BREMERTQN
REQUEST FOR INFORMATION
Log No (Urnque, Chronological)
Pro�ect Title
Contractor
Pro�ect No
Contract Date
� (For Contractor's Use)
Date Sub�ect
Information Descnption
Contractor's Authonzed Signature
(For Owner's Use)
Date Sub�ect
Information Descnption
Owner's Authorized Signature
1
CITY OF BREMERTON
' WORK CHANGE DIRECTIVE (WCD)
' WCD #: Date:
'
�
��
,
�
'
'
Pro,ect Name
Pro,ect #
Contractor
Notice to Proceed Date
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S)
ATTACHMENT(S)
If a ciaim is made that the above change(s) have affected Contract Pnce or Contract Times any claim for a Change Order
is based thereon will involve one or more of the following methods of determining the effect of the change(s) The
Change Order wdl be executed in accordance with Section 1-04 4 of the WSDOT Standard Spec��cattons, or Article 10 of
the General Conditions
Method of determining change m Contract Price
, ❑ Unit Price
❑ Lump Sum
' ❑ Time & Materials
❑ Other
'
'
'
'
�
,
,
Estimated increase (decrease) in Contract Price
$
If the change mvolves an mcrease, the estimated
amount is not to be exceeded without further
authorization
RECOMMENDED
CONTRACTOR
By
PAGE 1 OF 1
Method of determmmg change in Contract Times
❑ Contractor's Records
❑ Engineer's Records
❑ Other
Estimated increase (decrease) in Contract Times
Substantiai Completion 0 days,
Ready for fmal payment 0 days,
If the change involves an increase, the estimated times
are not to be exceeded w�thout further authorization
AUTHORIZED
CITY OF BREMERTON
By
�
,
,
�
LJ
'
'
�
,
LJ
LJ
,
'
'
,
'
'
�l
APPENDIX C
CONSTRUCTION DRAWINGS
'
'
,
1
'
'
'
'
'
'
,
,
'
'
1
'
�
'
'
,
�,� �� ���������
DEPARTMENT tJF' PUBLIC WtiRKS AND VTILITIESi
ENCIHEERING QIVISIt�N
:� � �� ' � ` � � ! � 1 � i ' � ' � � 1
� s •
• • . ;
.. . �
.
Lt)CAT�t,�N MAP
NTS
� ��
VICINITY MAP
NTS
PAGE
1
2
3
4
5
SHEET INDEX
Tl T�E
:,OVE� SHEET lNDEX,
�OCATiON MAP AND VICiNITY MAP
LEGENQ / NOTES, CROSS SECTI�N
PLAN BVR STA Q+00-60+00
PLAN BVR SfiA 60+00 — 84+31
�LAN B1lR STA 0+0{� — 47+95
'
�
'
'
'
'
'
'
'
'
�
'
1
'
1
,
,
' �
�
1
LEGEND
GENERAL NC�TES�
SIGNAL AND CHANNEUZATIC3N
1 N PROPOSEQ
SURVEY SURFACE FEA`fURES
��
o e o. ■ BUTfON LINE
� � 81KE DETECTOR SYMBOL
� � STt2AlGHT ARROW
�' j LEFT TURN ARROW
� '< RIGHT TURPJ ARRt3W
� m JUNCTiON BOX
[Q al JUNCTiON 8QX TYPE III
� � S#GNAI CONTR4LLER 90X
-D -► NEHIC!°E SIGNAI HEAD
�o �,i VEH4CLE SIGNAL NEAO N!/ ARROW INDICATOR
� ��� YEHICIE 100P
�- �F- SIGNAI POl€ Wj IUMINAiRE
c�-�- c�.�- 5lGNAL POLE
tt x PHOTDEIECTRiC EYE
'�—� h}� STf2EEf LIGHT ASSY
11 - � SiGN
I i
�
't.)°
D<1
���
�- -�
�'t��- -�
WATER METER
� fiRE HYORANT
N ca� vai.v�
WATER MAiN
SANITARY & STORM DRAINAGE
,� PROPO5E0
� • SAN SEWER CLEAN OUT
� � SAN SEWER MANHOtE
� � STORM SEWER MANNOLE
C3 i STORM dRAtPI CATCN 8ASlh1
>---c >-< cu�v�Rr
— s — SANiTARY SEWER
-°- � -- STORM pRAIN
b
�
�
�
GAS TELEPHONE 8c P(�WER
�
L�
�
�
�
�
-U-
�--
v
c
c
rv
• � i � ♦
--.•. �
♦'� •�►r
� tf `��t
�t1� tl
HANOlCAP CURB RAMP
cuaa
PAVEMEh1T REPAIR
;EPAlR 8Y ENGINEER
:XISTING DEPTH ASPHAIT
1 � • � � , ♦
� Et.EVA'fiONS ARf NRTlONAI GEODEiIC VERTiCA�. DATUM 1929 {NGV029)
2 COORDINATES ARE TO HQRIZONTAL IdATtONAL AQJUSfiEO DATUM 1983/91
(t�nt�a3/9 t )
3 CONTRAGTOR TO CALL UNOERGROUND UTIIITiES tOCATE SERViCE AT
1-$40-424-5555 A MINIMUM OF TWO WORKING OAYS PRIOR TO ANY
EXCAVA710N TNE KNOWN EX�5i°ING UNDERGROUNO UTIU7Y UNES ARE SHOWN ON
TNE 4RAWlNGS IN THE1R APPROXIMATE LQCATION THERE IS NO GUARANTEE
EXPRESSED flR 1MPUED, THAT AL� UTIUTY L.INES ARE SHOWN OR THAT LOCATIONS
ARE ACCURATE TNE CON7RACTOR SHALL UNCOVER At1. INDICATED PIPtNG WHERf
CRdSSiNGS INTERFERENCES OR CONNEC'TIONS OCCUR PRIOR TO TRENCHING QR
EXCAVA7ING F012 ANY NEW PIPE StRiJCTURES TO DETERMINE ACTUAL LOCATIONS
ANO SHALL MAKE TME APPROPRIATE PROVISIONS TO PROTECT SAID FACILITIES
FROM DAMAGE
4 CONS7RUCTiON CENTERLINE STATIONlAtG IS IDENTIFlED ON TNE PLANS
5 NORIZONTAL OIMENStONS AND S7ATION OfFS£TS ON RkAN AN� PROFILE SHEETS
TO PiP£UNES MANHOLES AND OTHER FAGiUT1ES ARE TO THE CENTER�IPJES OF
7t�tOSE FACILti7ES UNLESS SPECtFICALt.Y NO7ED OTHERWI5E IhNER7 EL£VATIONS IN
MANHOLES AND OTHER STRUCTURES lDENTtFIED IN THE PIANS REFERS TO T1iE
ELEVATtON AT i}iE CENTER OF TNf STRUCTURE
6 OVERHEAQ EIECTRiCAL POWER TELEPNONE CABL.E N AND OTHER OVERHEAU
ItNES ARE GENERALLY NOT SHdWN DETERMWE THE EXTENT OF HAZARDS OR
IMPACTS ON CpNSTRUCTION ACTM7IES CREA7E0 8Y OVERHEAO OR UNDERGROUNO
ELEG7RICAL R�WER TELEPHONE CABLE TV AND OTHER UNES IN Al.L AI2EAS
AND �OLLOW PRQCEDURES 011RING CONSTRUCTiON AS REQUIREd 8Y LAW ANA
REGULATiONS PRIQR TO CONSTRUCTlON MEET WITH UTILITY OWNERS TO
DETERMIPIE THE EXTEhl7 OF !-tAZRf7D5 AND TAKE WHAtEVER P12ECAUTION5 AND
REMEDIAL MEASURES THAT MAY BE REQUIRED TO PROTECT PERSQNS AND
PROPERTY AND TO AYOip DISRUPTION OF S£RV10E
7 MANHOLES AND STRUCTi1RES ARE SHdWN 4N PIAN AND PROf1LE ORAWIN6S
SYMBdUCAi.LY CONSTRUCT MANNOLES ANO 5TRUCTUR£S AS SHOWN OPl DETAlL
DRAWINGS AND AS SPECOFtED PIPE INVERT AND Si�OPE ARE BASED ON THE
CENTERLlNE 4F THE ORAINAGE STRUCTURE SHOWN
9 RIGFiT-OF-WAY ANQ PROPER'tY LJNES SHOWN ARE APPROXIMATE ONLY
10 THE CONTRACTOR IS SOLELY AND COMPlE7ELY RESPONSIBI.E FOR FURNISHING
INSTALt1NG AND MAtNTAiNiNG WARNING StGNS AND DEVICES NECESSARY TO
SAFEGUARD TNE GENERAL PUSUC OURING WpRKING ANO NON-WORKING HOURS
3 00 f— 12 OQ =T 12 00 ----------I 3 QQ
CRCJSS-SECTION
—BOTH ROADWAYS
Q 0 125 HMA OVERIAY
Q SNOUTAER DRESSING CSTC
Q EXISTING ROADWAY
FVC
CONG
EOP
FQC
HCf2
�
sacs
SDMH
£G
FG
�
R
BflW
�ac
GL
EX7ST
�iTS
ABBREViATIONS
- PpL1MNYl CNLORIDE
- COA1CREfE
- EDGE OF PAVEMENT
- FACE 0� CURB
- HA1dDICAP CURB RAMP
- UNEAR F00T
- STORIA DRAIN CATCH BAStN
- STORM DRAtN MANFidI£
- EXISTING GROUND
- FlNISH GROUND
- LEFT
- RIGHT
- BACK OF SIDEWALK
- TQP U� CURB
- GUTTER UNE OF SiDEwAUc
- EXISTING
- NOT TO SC+U.E
RQADWAY
3 QO PLAN
i
DRIVEWAY �
I
3 00 PROFIIE
FEATHER HMA OVERlAY
TO EXlSTVNG OR{VEWAY
HMA DRIVEWAY APPRC}ACN
D ETA! �
,
'
'
,
1
'
1
,
'
1
'
'
'
'
1
' �
�
a
a
' �
t
�
�
�
' �
'
1
'
'
'
'
'
'
'
1
'
'
'
'
'
1
'
'
'
'
�
�
�
�
a
�
�
�
�
�
���
� r
��
• . . � � . .�...�.�.......�.......
����M
NQR12 i'=940 YEi76'
�'�" �'°" CITY OF BREMERTON
DEPAR7MEfVT OF� PU8L1C WORKS & UTlLITIES
ENGINEERIlVG DIVISION
}RAWiNG Plf3 [lRAWN BY SM.J OESIGN 6Y G F CHECKED 9Y G F
OA7E 9jt3 WASH pE � 43788 OATE 9ff3 WA,SH PE. � 4398& DATE 9ft�
� � � � '�" �. �� i �.
�w a w• r t � rr�
�
�
+
�
CS�
�
�
�
___1
U
�
Q
�
SHEET
4
a�
5
ro
a
a
'
'
'
,
'
�
1
1
1
1
1
1
'
'
�
� �
0
U
�
�.
� �
�
�
�
1 �
�
���
£,�
:'_-�
� � � �—i��
� �����
,
� � J r
� � 65�� �
a g�-•.� 1 a
\.._.� � �
�'W'..-� �a
� � �� �� �
�� ����' �
� ��`�,��
� �--,
f.W.�.� ��,�
+� �
�
.�
� � i �> �,.
� � � t ` i`�1
���
�
+
N
Q
{�
W
z
�
�
�
�
�
0�
r�
9
� � �_
e
�`
�
�
����:.Y. �` �__._���i �'���
�
�
�
i � � �i
�'�
�
�
�f }
+
�
C�l
�
V !
�_1_.�
z
�
C�
�
�