' PUGET SOUND ENERGY
The Energy To Do Great Th�ngs
Exhibit "A" Project Plan
Schedule 74 Underground Conversion
City of Bremerton — Pacific Ave, 6 to 9 - Schedule 74
Underground Conversion
PSE Project Number: 101069305
3/21/2013
Pursuant to Puget Sound Energy ("PSE") Rate Schedule 74 and as descnbed m this Pro�ect Plan,
PSE will convert its exishng overhead electrical distribution system of 15,000 volts or less to an
equivalent Underground Distnbution System This Pro�ect Plan descnbes work to be performed
by PSE and the Crty of Bremerton (the "Crty") for the conversion of certam PSE electncal
distnbution system facilrties as descnbed herem (the "Conversion Pro�ect") Construction of tlus
Conversion Pro�ect is contmgent upon and shall not commence pnor to both wntten acceptance
of this Pro�ect Plan and written execution of a Schedule 74 Construction Agreement by the Crty
and PSE
This Pro�ect Plan mcludes and consists of.
• Detailed descnption of the Construction Work to be performed
• Construction Drav�nngs, Standards, Specifications and Requirements for the Construction
Work (attached)
• Operating Rights to be obtamed for the Conversion Pro�ect (attached)
• Construction Work Schedule
• Construction Costs Estimate Summary (attached)
Revisions to this Pro�ect Plan must be mutually a�proved bv the City and PSE
Scope of Work
This Conversion Pro�ect will replace PSE's existing overhead electrical distribution system with
an Underground Distnbution System withm the followmg area (the "Con�ersion Area") Both
sides of Pacific Ave from 6`" St to 9�" St The Conversion Project is approximately 1700 feet m
length, mcluding laterals and road crossmgs
The Conversion Pro�ect includes modification or replacement of all existmg services lines wrthm
the Conversion Area to connect to the Underground Distnbution System and removal of PSE's
existing overhead electnc distnbution facilrties (mcludmg PSE distribution poles and pole
mounted street lights) from the Conversion Area
C�ty of Bremerton — Pac�fic Ave, 6�' to 9`" - Schedule 74 Underground Convers�on
PSE Pro�ect Number ] 01069305
Page 1
Fluidized Thermal Backfill (FTB, a form of controlled density fill) is required m trenches
contaimng four or more PSE six mch ducts FTB will be used m place of standard backfill as
shown in the Construction Drawmgs m accordance with applicable PSE Standards
There are no Company Imtiated Upgrades, Government Entity Requested Upgrades or
Temporary Service elements mcluded m the Conversion Pro�ect Scope of Work
PSE will relocate under franchise its overhead facilrties from 9` St to 11`" St, approximately 400
feet
PSE imtiated upgrades included m this pro�ect consist of Two spare conduits are allowed as
shared costs per Schedule 74 PSE has opted to install a tturd spare conduit (6") and pull vault
from SWOI to PVO1
Crty requested upgrades mcluded m this pro�ect consist of None
Temporary Service mcluded �n this pro�ect consists of None.
The followmg portions of PSE's existing facilrties to be converted are located outside of Public
Thoroughfaze Vault with padmounted transformer on easement at Uptown Auto Body Rebuild
In con�unchon wrth this Conversion Project, PSE will remove rts existmg street lightmg system
from the Conversion Area Provision of a replacement street lighhng system wrthm the
Conversion Area is not included m this Pro�ect Plan Replacement street lightmg service can be
provided by separate arrangement in accordance wrth applicable PSE Tariff Schedules
Responsibilities of Parties
Citv Responsibilities
a) Provide written notice to customers withm the Conversion Area in advance of Conversion
Pro�ect Construction Work start The notice will mclude contact mformation for both the
Crty and PSE, the expected Conversion Pro�ect schedule, anticipation of service mterruptions
and work required to be performed by customers
b) Coordmate other utility conversion, removal and relocation from PSE's poles.
c) Provide all surveying for equipment placement, locations, and establish all grade elevations
for the Underground Distnbution System withm the Conversion Area
d) Provide all necessary excavation, beddmg, backfill, off-site disposal, site restoration and
coordmation for installation of the Underground Distnbution System This mcludes
trenchmg, backfill, and restoration for cut-over and transfer of existing underground system
and service lines from the existing overhead distnbution system to the new Underground
Distribution System
e) Coordmate private property trenchmg, excavation and restoration activrty with pnvate
property owners affected by tlus Conversion Pro�ect
fl Provide flagging and traffic control as required for all work performed by the City.
C�ty of Bremerton — Pacific Ave, 6'�' to 9` - Schedule 74 Underground Convers�on
PSE Pro�ect Number 101069305
Page 2
g) Install and proof all ducts and vaults for the Underground Distnbution System (excludmg
work m ducts or vaults contammg energized cables or equipment — see PSE Responsibiliries)
in accordance with PSE standards and specifications using ducts and vaults provided by PSE
"Proofing" as used herem is defined as verification usmg a mandrel that the duct and vault
system is free and clear of damage, installed to the proper grade and at the proper location
and contams a pullmg lme
h) Provide PSE at least ten (10) busmess days notice prior to the start of trenchmg activity to
allow for delivery of PSE matenals to the �ob site and scheduling of PSE's on-site Inspector
Provide at least five (6) business days notice for scheduled delivery of vaults from the
manufacturer
i) Provide secure stagmg and storage area(s) for duct and vault materials provided by PSE The
Crty shall be responsible for the secunty and condrtion of these matenals unhl they are
mstalled and accepted by PSE or returned to PSE's custody
�) Provide labor and equipment for the off-loading of PSE duct and vault matenals delivered to
the �ob srte
k) Promptly following notice from PSE that the Underground Distnbution System has been
energized, provide notice to customers withm the Conversion Area mforming them of their
obligation and responsibility to convert their overhead service lmes to underground service
lines as provided by state law or to modify existing underground service lines for connection
to the Underground Distribution System Affected service Imes are listed in the Service
Lmes section of this Pro�ect Plan
1) Facilitate weekly (or as otherwise agreed by the City and PSE) construction coordination
meetmgs to mclude all relevant parties participatmg m the conversion includmg PSE and rt's
contractor(s), the Crty and rt's contractor(s), and other uhlrties
m) Provide any necessary operating rights for the mstallarion of PSE's facilities in accordance
wrth PSE's Schedule 74 Section 3 and as mutually agreed by the PSE and the Crty
Operatmg nghts are further addressed m the Operating Rights section of this Pro�ect Plan
n) Modify, reroute or replace service lmes to Crty owned facilrties to connect to the
Underground Distribution System
o) Followmg notification from PSE that Construction Work is complete, provide to PSE any
Shared Government Costs as provided for in the Construction Agreement
Puget Sound Ener�v Responsibilities
a) Provide all duct and vault matenals, cables, electncal equipment and components necessary
for installation of the Underground Distribution System
b) Followmg notice from the City, deliver or cause to be delivered all duct and vault matenals
to the designated staging/storage area(s) Acknowledge delivered quantities and condition of
duct and vault materials by sigmng shippmg manifests
c) Followmg notice from the City, provide inspection services needed for overseeing the proper
installation of ducts and vaults by the City
C�ty of Bremerton — Pacific Ave, 6`" to 9`� - Schedule 74 Underground Conversion
PSE Pro�ect Number 101069305
Page 3
d) Accept delivery of the completed duct and vault system once the new system has been
proofed (as descnbed above) by the City PSE will provide a mandrel to the City to be used
in proofing of the duct and vault system
e) Provide PSE electrical workers to complete duct mstallation and proofing when such work is
performed at or m any energized vault containmg energized cables or equipment
� Install (except for ducts and vaults installed by the City) and energize the Underground
Distribution System Provide written notice to the City when the Underground Distribution
System is energized
g) Perform cut-over and transfer of existmg Underground Distnbution System and existmg
underground service lines from the overhead distribution system to the new Underground
Distribution System where applicable (see Crty Responsibilrty rtem "d" concernmg trenching
responsibility) PSE will notify the City for excavation and the affected customers at least
two (2) busmess days prior to installation, transfer, and connechon of underground service
lmes Affected service lines are listed in the Service Lines section of this Pro�ect Plan
h) Install and connect replacement underground service lmes to single family residences and
connect modified and replacement non-residential underground service lines provided by
customers within the Conversion Area pursuant to PSE Tariff Schedule 85. Affected service
lines are listed m the Service Lmes section of this Pro�ect Plan
i) Remove the existmg overhead electric distnbution system including, conductors, equipment,
down guys, anchors and poles after all service lmes to customers withm the Conversion Area
are connected to the Underground Distnbution System and all other utilities have been
removed from PSE's poles Holes left following removal of poles will be filled with crushed
rock and compacted m accordance wrth applicable Crty standards or specifications
�) Provide flagging and traffic control as required for all work performed by PSE (except as
may otherwise be reasonably provided by the City during mstallation of ducts and vaults m
con�unction with Crty performed trenchmg, excavation, back-fill and restoration)
k) Attend weekly (or as otherwise agreed by the City and PSE) construction coordination
meetings facilrtated by the City and its contractor during penods of Conversion Pro�ect
construction
Operating Ri�hts
The Underground Distribution System will be located withm Public Thoroughfare except as
described in the Operating Rights Attachment The Construction Work will not be released by
PSE for construction until i) all operating rights necessary for the installation of PSE's facilrties
have been obtained and have been venfied by PSE, or u) the Crty otherwise signs an agreement
releasmg PSE from any and all financial obligations associated with the location or relocation of
PSE facilrties resultmg from commencement of construction pnor to acquisrtion of all identified
necessary operatmg nghts
City of Bremerton — Pacific Ave, 6` to 9'�' - Schedule 74 Underground Conversion
PSE Pro�ect Number 101069305
Page 4
Construction Work Schedule
The work will be performed m accordance with the followmg Work Schedule, unless this
schedule is revised by mutual agreement of the City and PSE or circumstances beyond the
reasonable control of the City and/or PSE preclude such performance
Installation of ducts and vaults: The City has estimated that installation of the duct and vault
system will take 25 working days
Installation and ener�ization of the Underground Distribution Svstem: Estimated 25
working days (Plus 10 days for relocation of overhead system between 9 and 12tn )
Removal of overhead facilities: Estimated 5 days
Installation and removal of Temnorarv Service: None
Work Schedule Restrictions: PSE cable to be mstalled after conduit and vault installation has
been completed and approved and city's contractor has completed asphalt and curbs The intent
is for PSE and utilities to have the wmter months to complete their work and the contractor will
come back in the sprmg to complete sidewalks and landscapmg
Construction Cost Estimate
The estimated costs to perform the Construction Work and the allocation of costs between the
parties are presented m the attached Construction Costs Estimate Summary These estimated
costs are valid for ninety (90) days from the date shown on the attached Construction Costs
Eshmate Summary If this Pro�ect Plan and a Schedule 74 Construction Agreement are not fully
executed wrthm ninety (90) days from this date, the estimated costs shall be sub�ect to revision
Estimated Inspection and Service Provider Outside Services costs are based on 2013 contract
rates Costs for work performed by PSE after January 31, 2014 shall be sub�ect to revision to
reflect contract rates which become effective after this date Further, m the event performance of
the Construction Work does not proceed substantially as provided m tlus Pro�ect Plan, PSE's
estimated construction costs shall be sub�ect to revision
Changes in Construction Work scope, performance and/or schedule can result in actual
Construction Costs which sigmficantly differ from estimated costs shown m the Construction
Cost Estimate Summary Such changes shall promptly be brought to the attention of PSE and
the City when anticipated or known to occur and shall be documented m a Change Order
mutually agreed by the Crty and PSE
Proiect Assumptions
The pro�ect design, construction plans and cost estimates are based on and reflect the following
assumptions Construction conditions that are not consistent with these assumptions may result
m a request for change or an equitable ad�ustment to pro�ect compensation under Section 6 of the
Construction Agreement
Crty of Bremerton — Pac�fic Ave, 6` to 9` - Schedule 74 Underground Conversion
PSE Pro�ect Number 101069305
Page 5
Cost Assumations
The Construction Work will be performed in accordance wrth the Construction Drawings and
Construction Work Schedule
2 PSE's Pro�ect Manager will accept or reJect (with written�ustification) the duct and vault
installation work performed by the Crty wrthin five (5) business days notice of completion
from the City In the event PSE re�ects any of the ducts or vaults (with reasonable written
�ustification), the Crty will perform the necessary remedial work The City will then re- �
notify PSE and PSE shall have five (5) busmess days to accept or re�ect the remedial work
3 All PSE cables can be pulled through the ducts and vaults system, mcludmg existing ducts
and vaults if applicable, to be used for the Conversion Pro�ect utilizing normal cable pulling
equipment and methods
4 A Crty Street Use permrt is the only permrt necessary for PSE to perform rts work for this
Conversion Pro�ect and will be issued wrthin two (2) weeks of PSE submittmg a complete
permrt application (includmg any supportmg documentation reasonably required by the
Crty) There will be no charge for the permrt or mspection fees
5 The eshmated days rt will take the crty to complete the mstallation of ducts & vaults is 25
days which the number of days a PSE Inspector will be required to be present The mspector
will be scheduled m full day mcrements and in one contmuous effort Changes to a
contmuous schedule require a mmimum of five days advance notice and must be mutually
agreed between the City and PSE Pro�ect pricmg is based on the estimated 25 days of
Inspector time Changes to this estimate will be "trued up" to actual time spent by Change
Order
6 Traffic control provided by PSE assumes the use of two flaggers, basic signage and simple
channelization Addrtional traffic control measures are not mcluded
7 Work to be performed by PSE does not mclude mstallation andJor removal of Temporary
Service facilities at the request of others durmg construction
8 All cut-over and transfer work will be completed durmg regular worlang hours
9 New guy anchors shall be mstalled prior to installation of new ducts m the same area
10 When Fluidized Thermal Backfill (FTB) is used, associated cost will be allocated 100% to
PSE when required for a Company Imtiated Upgrade and otherwise 100% to the City
11 Installation of protective bollards may be necessary at some locations and may not be
mcluded m the pro�ect design In the event unplanned bollards are required, associated costs
will be a Shared Cost
Schedule
There will be a total of two (2) PSE crew mobilizations as follows i) one mobilization of an
underground line crew for installation of underground conductors and equipment, and ii) one
mobilization of an overhead lme crew for removal of the existmg overhead facilities Once
mobilized PSE crews will have contmuous productive work until all PSE Construction Work
is complete
City of Bremerton — Pac�fic Ave, 6`�' to 9` - Schedule 74 Underground Convers�on
PSE Pro�ect Number 101069305
Page 6
2 All PSE Construction Work will be performed durmg regular working hours from 7 am - 10
pm Monday-Fnday excludmg holidays In the event that lane closures are necessary for
performance of work, PSE may close lanes any time durmg the regular working hours PSE
shall be allowed to perform PSE work as scheduled v�nthout changes or interruptions caused
by other construction activrties
Work requinng scheduled interruption of electric service (cut-overs and transfers) will be
performed during the workmg hours specified m Schedule Assumption #2 above, and will be
scheduled with at least two (2) busmess days notice PSE will notify customers of scheduled
service mterruptions
Additional Considerations
Service Lines
Service lmes withm the Conversion Area must be modified or replaced to provide underground
service from the Underground Distnbution System as descnbed as listed m the Construction
drawings Performance of the work and associated costs shall be governed by PSE Tariff
Schedule 85
Cut-overs and Transfers
PSE customers withm the Conversion Area will expenence mterruption of electric service during
performance of the Construction Work when transferrmg system and customer loads from the
overhead distribution system to the Underground Distribution System PSE will notify customers
at least two (2) busmess days in advance of expected service mterruptions Customers may
request that cut-over and transfer work affectmg their service be performed outside the regular
working hours listed above sub�ect to the customer's written agreement to reimburse PSE for the
additional cost (at overtime rates) to perform such work outside the regular working hours
New Service
Connection of new ar increased load for City facilities (such as new traffic signals) under terms
of PSE Tariff Schedule 85 will be addressed on a separate work order and work sketch
Addrtional costs may apply and will be quoted separately
PSE Desi�n & Construction Standards
This Conversion Pro�ect has been designed and will be constructed m accordance wrth PSE
design and construction standards in effect as of the date of this Pro�ect Plan PSE standards
applicable to Construction Work to be performed by the City have been provided to the City m
PSE's "Electric Distnbution Trench/DucWault Construction Standards, 2009" All relevant
PSE standard descnbed above are attached to this Pro�ect Plan by this reference
C�ty of Bremerton — Pactfic Ave, 6` to 9` - Schedule 74 Underground Conversion
PSE Pro�ect Number 101069305
Page 7
Temporarv Supnort (Holdin�) of PSE Poles
Whenever any pole(s) are required to be temporarily supported (held) due to excavation m
proximity to such poles, the City will coordmate with PSE to provide such support The need to
temporarily support such poles shall be determined by PSE, and if required, such support shall be
provided by PSE As used herem, "temporary support" means supportmg one or more poles for
a contmuous workmg period of ten hours or less
Acceptance of Proiect Plan
The City and PSE mutually agree to and accept this Pro�ect Plan as of the date mdicated below
For the City
By �
Its /17� /�-'-
Date ,� — �/ — /3
For PSE
By
Its , v ` L �
Date 3 — �""�' �3
City of Bremerton — Pac�fic Ave, 6` to 9`� - Schedule 74 Underground Conversion
PSE Pro�ect Number 101069305
Page 8