Loading...
HomeMy WebLinkAbout5236Contract Number Vendor• Sub�ect. Department File Class. Begin Date: End Date Review Date Vault Date• Comments 5236 ROGNLIN'S INC Eastside Beach Main Replacement Engineering LEG 12-1 5/7/2013 � � ' - _' _ _ -� � : � � � � � 1 � � r � �� , � � 1 � �� r � � 5���s �� _ , „ 13 pages {2 pages text, 11 plan sheets) , The follov�nng shall modify the ConVact Documents and the work shall be accomplished in accordance with such mod�cations It is requested that this addendum be stapled to the Bid Documents IMPORTANT: THIS ADDENDUM SHOULD BE ACKNOWLEDGED IN YOUR BID FORMS WHEN YOUR BID IS SUBMITTED FAILURE TO ACKNOWLEDGE THE ADDENDUM MAY CONSTITUTE GROUNDS FOR REJECTION OF THE BID Contents This Addendum No. 1 contains revisions to the Spec�cations and/or the Contract Dra�nnngs Revisions to the Spec�cations are made by reissuing entire sections, reissuing specific pages of sections, OR by d�recting a change in writing, herein. When a paragraph or sentence is modified, additions are mdicated with bold text and deletions are indicated w�th strikethrough text. Revisions to the Drawings are made by re-issumg a drawmg, issuing a revision to a specafic detail from a drawmg, OR by directing a change in writmg, herein Bidders are cautioned to check the addendum contents carefully for the presence of all listed revisions Distribution This Addendum No 1 is distnbuted to all planholders of record lntearation The following changes, add�tions, deletions and attachment are hereby made a part of the Contract Documents for Eastside Beach Main Realacement, as fuily and completely as d the same were set forth therein Acknowleds�ement of Receiat of Addendum All prospective bidders are instructed to mcorporate this revision into their bids and to complete the acknowledgement of receipt of addenda in the Bid Proposal Fadure to do so may result m the Bid bemg reJected as not responsive. Crty of BremerMn Page 1 of 2 Mer�h 2013 Eastslde Beach Marn Replacement Addendum #! CITY OF BREMERTON ADDENDUM NO 1 TO CONTRACT DOCUMENTS for EASTSIDE BEACH MAIN REPLACEANENT issued March 28, 2013 ' � � � , � ' ' � � � ' , � , , ' , , Revisions to Contract Plans Item # 1 Plan Sheet Sheets G3, C2, C3, C4, C5, C6, C7, D2, D3, and D4 Descnption These Sheets are DELETED AND REISSUED Revisions mclude • The alignment of the new 24" main between Station 1+00 and 30+82 is revised by increasing the horizontal offset between the existmg 20" AC pipe and the new 24" HDPE sewer pipe from 5' to 10' • The mirnmum cover over the new pipe is reduced from 4' to 3' • The invert elevation of the new pipe does not change as a result of these revisions • The sheet notes on Sheets C2 to C7 are revised • On Sheet C3, a requirement is included to remove approximately 20' of AC pipe at approximately Station 6+50 that is exposed or shallow buried • On Sheet G3, the Pipe Centerline Alignment Table is revised to reflect the revised pipe alignment • On Sheets D2, D3, and D4, revisions to the detads reflect the revised horizontal offset between the existing and new pipe Item #• 2 Plan Sheet Sheet D1, Pipe Trench Section Detail Descript�on: Detad is reissued to show the 10' offset between the new and existing pipe and 3' minimum cover Item #: 3 Plan Sheet Sheet D1, Pipe Plug Detad Description Detad is re�ssued to delete manhole plugging detad City of Biemerton Page 2 of 2 Easts�de Beach Main Replecement Ma►Gh 2013 Addendum # 1 PIPE CENTERLINE ALIGNMENT POINTS AND INVERT EIEVATION STATIOM NORTHING EASTING PIPE {E 1+00 1194866 41 217582 84 113 23 1+50 1194914 58 217569 49 113 03 2+00 1194963 31 217558 58 112 83 2+50 1195012 60 217550 74 112 63 3+00 1195062 27 217545 04 112 43 3+50 1195112 04 217540 20 112 01 4+00 1195161 81 217535 35 111 39 4+50 1195211 54 217530 O6 110 77 5+00 1195Z61 35 217527 53 109 94 5+50 1195310 98 217521 95 108 86 6+00 1195354 68 217506 59 107 78 6+50 1195395 90 217479 07 106 70 7+00 1195436 04 217448 96 106 84 7+50 1195481 54 217429 72 106 98 8+00 1195530 14 217417 89 107 13 8+50 1195579 21 217408 55 107 27 9+00 1195628 54 217400 37 107 41 9+50 1195677 76 217391 5$ 107 SS 10+00 1195727 OS 217383 15 107 69 10+50 1195776 48 217375 63 107 84 11+00 1195826 Ol 217369 60 107 99 11+50 1195875 88 217365 94 108 12 12+00 1195925 87 217365 32 108 27 12+50 1195975 79 217367 15 108 41 13+00 1195025 60 217370 42 108 55 13+50 1196075 50 217373 27 108 69 14+00 1196125 28 217372 85 10$ 8A 14+50 1196175 06 Z17367 39 108 97 15+OQ 1196224 62 217350 97 109 81 15+50 1196274 23 217354 89 110 65 16+00 1196321 77 217342 03 111 49 16+50 1196367 80 217322 59 112 04 17+00 1196413 47 21730226 112 28 17+50 1196459 13 217281 82 112 52 18+00 1196504 98 217261 90 112 76 18+50 1196551 40 217243 32 113 30 19+00 1196599 27 217228 70 114 33 19+50 1196648 37 217219 80 113 00 20+00 119669716 21720916 11145 20+50 1196745 18 21719526 110 06 21+00 1196793 22 Z1718139 104 44 21+50 1196840 85 217166 22 109 25 22+U0 1196887 91 217149 36 109 06 22+SQ 1196934 83 217132 09 108 87 23+00 1196981 74 217114 78 108 67 23+50 1197028 61 217097 37 108 49 24+00 1197074 77 217078 35 108 29 24+50 1197119 89 217056 83 108 10 25+00 1197164 48 217034 22 107 92 25+50 1197209 10 217011 82 107 73 26+00 1197253 48 216988 89 107 62 26+50 1197297 04 216964 50 107 35 27+00 1197339 73 216938 66 107 16 27+50 1197382 36 216912 42 106 97 28+00 1197426 05 216888 29 106 77 28+50 1197469 66 216863 94 107 47 29+00 1197513 07. 216838 95 108 17 29+50 1197556 40 216814 14 108 88 30+00 1197597 93 216786 39 109 22 30+50 1197637 82 216756 39 109 56 EXISTING SURVEY CONTROL POINTS NUMBER NORTHING EAS111VG 6 1194833 49 217579 41 7 1195853 88 217276 60 8 1195587 24 217276 08 9 1195332 75 217628 77 10 1195280 66 217417 69 i1 1196274 49 217338 72 12 1194585 77 217556 08 13 1194411 52 217598 59 14 1194047 14 21772127 15 1197219 30 216957 76 16 1193701 32 217920 24 SURVEY NOTES 1 THE CONTRACTOR SNALL MAINTAIN ALL MONUMENTATION WITHIN THE PROJECT LIMITS MONUMENTS THAT MAY BE DESTROYED BY CONSTRUCTION SHALL BE REFERENCED AND IF DESTROYED SHALL BE RESET PURSUANT TO RCW SECTION 58 09 13 AND 332 130 030 2 MONUMENT LOCATIONS SHOWN ON THE PLANS ARE APPROXIMATE THE PLANS MAY NOT INCLUDE A�L MONUMENTS F1ELD LOCATION OF MONUMENTS AND REFERENCES ARE THE RESPONSIBILITY OF THE CONTRACTOR THE CITY WILL PROVIDE RECORDS OF SURVEY TO THE CONTRACTOR AFTER CONTRACT AWARD 3 REPLACEMENT MONUMENTS SHALL BE BRASS CAP IN CASE PROVIDE SUBMITTAL OF PROPOSED PRIOR TO INSTALLATION 4 AN ELECTRONIC COPY OF THE AUTOCAD DRAWING FOR THE PLAN AND SURVEY FROM AES CONSULTANTS (JULY 2012) WILL BE FURNISHED TO THE CONTRACTOR UPON REQUEST TO ASSIST IN LAYING OUT PIPE ALIGNMENT HORIZONTAL CONTROL WASHINGTON STATE PLANE, NORTH IVAD 83 (03) PT #2 SET�" REBAR WITH RED 1 D CAP IMPRINTED "CONTROL 20795" IN LIONS PARK +/- 180' WEST OF EASTSIDE TREATMENT PIANT, 19 5' SE OF SE CORNER OF CONCRETE PAD FOR BENCH, 1 0' NORTH OF 4' DIAMETER BOULDER N 217825 2640, E 1194530 5400, ELEV = 125 22 {COB DATUM) PT #9 SET 2" REBAR WITH RED I D CAP IMPRINTED "CONTROL 20795" IN LENT PARK, 34' NORTH OF STAIRS TO BEACH, 23' WEST OF SEWER MH, 4 5' WEST OF CONCRETE SIDEWALK N 217628 7744, E 1195332 7541, EIEV = 130 36 (COB DATUM) REVISIONS o , z NO DESqt�PlION DdiE BY '�' 40D #1 ITEM t PLAN SHEET REIS UED 3t28/13 WJD T� �NCHES AT FUII SCAIE IF NOT SCALE ACCQRGIhGLY SCALE HeRiz N/A VERT N/n flELD BOOK NO ������� �� � � t► � ♦��� � � �1►1,�� • .. . Yt � k � j 4 � ��'�i�r. �� _ .� ��, �� •{/ `< � � $ � � � � �'"` � �' ; c � � � = w �l� .�� j � � ��, ` , ��� , �s ^��' � +�� r t� �t��� :� ,� , s �'� � � n ry ,.r� � �" � �, � �5 � � �, , �, � � � -' V � -�`� ` � ; > , C' �Y � � � � "�,-� , " y. f $ ' a t . ;.� _ ,. W t� � ^� } � ^ �� ` �., � , .� U -� �� ; � � �� � � � ��� � 'f1Ck��l S " t ���' , �� � a , r � � ��e � - � �," �;�` � ; } , ��a� , � � � c�� ti�� . ; � F� } �' � � �v C�'a. � /.. 0 PLAN AND PROFILE SHEET INDEX EA�T LIOPIS PARK ��EMERTt�1�i �� � � � �`'��`l �� �� � �'',�' �� �� tis' ■ II oF B�G�lOG��oa- DEPAEtTMENT OF PUBLIC WORKS 8. UTILITIES ENGIFdEERING DIVISION � �� �� 90 � ., ��- - � e°=.� �� �, `�. ��� �� � �� �_� _ fi � �'� `�� b� 9' � �------1ltlEs�T F�iD STAt31Fit3 AREA A4� BEACH At�ESS (SEE SC1E PUW ON $1�EET C1) "1-- EJAS'1'3lDE 4RE�►TAi9�1T PIANT WEST END STAGING AREA AND BEACH ACCESS EASTSIDE BIEACF9 MAIN REPLACEMEMT S9iEET 9NDEX AND SURVEY COt�I'1'ROL BY TH DESIGN 91^ WJD CHEGKm BY NL /13 ! WASH P E � 34781 DA7E 3/iJ ; WASH P E y 30749 DA7E z ac i iut . r t " i} �:, .."+.( y• X ,.- ' a � , J ` `•i r � ' �, ,�. ; ., > � � � , ;a .p vY 7 ��0 �' zm�' ~ �� N_ 1 � " y p ��sl�` ,_.,�.� �� , o � � t .�� . �� �1 ` ¢ B►�E��; � „�`�� t � ( �. � � � G �i 'b �� � � � `,. �. � . e << u �.� � t`'T y _ —° _ . o � � '"° � _ � .�,� � � �, � �`,v. i �_ ' � �� � �� ��� � ,�'%" ` � � , � ��, A � � �` a n �' ^-� � � � . f r �' _ , ;. , � � _ , r ` ,�, r �,�' � ��.'� � � N � � �,, G3 ShEET � c� 3 C'7 � "' 15 z a , , , i ' , � ' � � � � , , , � , , ' I 1 , SSMH I � ' ` 7op=130 61' � 0 l , IE=120 85' 18"Steel N lTY OF BREMERTON CITY OF BREMEI2TON IE=120 78' 18"Steel S LENT LANDlNG PARK ' � IE='121 36' 6° W � qSPHALT ROCK WALL J STEPHENSON PROPERI7ES LLC JANET & CLETUS SDMH ' ,` APPLETON STAIRS TO BEACN � �D%NG ABANDON SEE SHEET D3 t � , __: '°--�, FOR CONNECTION TO EXISTING PIPE � � � =r ��� = __- -_- � � , � �- � _ ' ___ ----/'�'/ _a-,_ 1 g ,� � �I � ' _-_ _' _ -- ' ��, _- � t2 � � ' /'� , _t_ . ,. ����� -, - __ '__ _= ACCESS PORTTEES � EX 20" SS (AC) � __, ' ' STP�.5+35 __ i ' � � `-� -t-� :=` - FOR EX 20" AC , _-- ' � __ "S`EE SHEEJ-�4- � ; � � " " ^TOB � ,� r.�. -_ - - �---� --_- — � � � � •� - ... �. i AeP}SROX STA5+30 � ,_ � _ F�R-&tD�` SEWER i `R WA�L _ i _ - - - - - � � � ,_ �__ - ' _ - .T � F-�G-�S""x 10" WY ��" ._ - �CONNECT�� � Q � _ - __ --� ----- �e� — — — ' -- ----- ,-- __�'-r __, �, � �, �, �� ��- C� z - _��� �-�____ 2 ss �� a ---------------------------- ----- - ------- ' ss-__--------_--SS -- --- � ^y �.�,_~� �� -' , ,�� '� .. , -. _ , , _ _� _ � Z - --- i , _ _ _ ```` `2 a g - _-- ' - __'__----`l� ---- ----------------- -------��--- -- -------�---_-_ --------�+-Dp--- '- ---_`_ _!_---- Y __ l S9--�� � _ i - -. - " s � >! �` ` �� � '--_~____--'_-__...__ --4v'___ __________________________________ __________....___ - _____-__________`__��,,/ = r% \ -,1 �� ` _________________ -`______�_ ^ �� --------------------- ------- i15 0 ``''' `4_"-- 1l5 0 NEW 24" SS (HDPE) � �.r o _ • "�,r10TES''--_ # ��"-_ ______, _ �„_ 1 ` ' T i'�P�GALHORICDf 3- T - B€IbfEENEX. 20 'SSAFID' ---- -- ----- ----------- _-------------------,--- -�- `° y ,• '' 24" TO OUT$ --------------------- � ----------------------------------------------------------- ,� � P '_'-------------------- � MIN �OHER-�VER NEW P'If�EfS�-D ---------- ------------------------- °-'----- --------------------------------------------------------- ------------------------� ,3 ' EMOVE1Af0i�DY '--------------- �- ���•-• , ---------------------------- `. �`'iQtNSTALL t�F-�e�F�___r _��rr��7�0 ----------------------------------------------- , ; �ti --------------- ��"~-A�ONG �OEOF-BANK�_ ---------- _ ---------_ ------ ---------------- '-____ • i ------------------------------------------ ----- . --------- -----------_ -' - 4 -- NANDLE7WD��lSPOSE OF A� P1PE1N" `-- - -- -- --- - - - '' - " _,E1C�GDRDAt+lGEWITH'$ECTION �-------- ��' _, � -�-` ----- ___ -' --------- - , ------- - ---------- '------ ______ -----------____----------------------------------- -___. 130 �� 225 00' 150 00' 175 00' Slope = 004 Siope = 012 Slope = 022 f25 i� � MHHW = 121.57 - '� _ ExISTING GRApE U �� eo X V W � ��, � 115 tf5n - - - _ ___ _� � _ ___.__ �,________ �___ _ __ o - - - - - - — - - - - NEW 24" SS (HDPE . __ __ _ _ __ _ + - �-u � _) � � ------ __._ -- _ _ _ _ _ _ z � 1}0 p MLLW= 109 83 = ZERO TIDE � �� � __ � 110 F W � W � 105 = �� � N Q � G �3 fOQ �� c � f7 � M M t") M f J M �['7 C�7 P') O Q� 00 t� tD � R O�0 f` � N � O Q7 a0 M1 [D 4'l �� f] C7 N- Ff O 1� `�t � I�. Q3 C7 O1 1`+ V' N O �D O O� Q N h � f'7 1� N M C'� M N N N N N N N N O O � � a0 aD n / � � � � � � � � � � � � � � � � � � � � � � � T n � n � n � � � � � � � � � � � � �i �W �W �W �W �W �W �W �W �W �W �W �W �W �W �W �W �LL1 �W �W �W ��y,� W� — � � � � _ � � � � � � _ _ � � � � � � 1+00 1+50 2+00 2+50 3+00 3+50 4+pp 4+50 5+00 5+50 6�00 z � e4 , �HN � � ` �� OF XA9 H� U a� REVISIONS o ,• r Fl� � �`�� �� ��������(� CZ � ° No oESC�PnoN on� ev EASTSSDE �EAC�B INAiN REi��ACEMEN� S�� a ,., AD #1 -ITEM 1 PLAN SHEETREISSUED 3128/13 WJD 'iHroINCHESnTFUUSCafE DE�ARTIWENT OF PUBLIC WORKS S UTILITIES e�, �� � IFNOTSCALEACCARDINGLV ENGIRlEE6t11�lG DIVISION �4.A�1 A@!'I� PItOFILE � 5 � lax�� OF p , SCALE �►+� "� �,� �� oESici+ er wrv cr+ECUEO er Nc STATIOPI '0+00 TO STAlf10N 6+00 � 15 " �J � HOfxIL )`� 20' vERT T'! S' pq7� 3/13 WASH P E/.T4781 DATE 3/13 WlSM P E } d0749 DAiE 3/T3 a � 1 , � � � � � � � � � � i 1 � , , � ' � , , � ' � RlP TIDE j o 2 3" PL�STIC � I DRAIN OUTLET � DOUG VYEEKS C NSTRUCI70N E1_12015 � ( R!P TIDE C�NDOMlNIUM ' SEE NO7E 1 I � R1P770E DEVE OPMENT CD � � � `' ' � � 4" PLASTIC f STA 13+87 � � � � DRAIN OUTLET SEE SHEET D4 CfTY OF BREMERTON � t + � SEE NOTE 1 ' CONNECTION �R Nor� ' � � ' ' WOODY AND MAN MAC � pROTECTOtiAIN PIPE I I t �� � L ,� 1 � _ OUTLETDUPoNG CONSTRUCTION DRAIN CONVEYS SURFACE —�! - - - - " -- -� WATER FROM UP SIOPE �' � � APARTMENTCIX�APIEX �. _ _ _ � �20 p y ' �'T pg ae � ---- • �-__ _ .^ - � __ � °� --A��ROX STA 13+ � � - "� --___ 9�_ ___ _ � "" _ -' - EX 20" x 8"'TEE' ` ~ - � - � � � , - - ..�._�.- "- " "`70B-"' � I EX 20' �SEAC�� , _- _ ___ _ _-,__,_ _ _ -_ � - APPRO�-L�TICIAL___ - - y-- ` \ � � `\' � U -_ _ ------ � \ - -- --------- - ,� _ - __- ,--s�_ __ � ss _`; =- �-ss-__ - _ -_ '�' _ � `.. �r � `\ z � -----� �, __- _ -`---' , _ ------------ _!_ ___-----' __ --` _, q � ' __ _ '- ' &S ` ~� -__ � � - ----N N � _ --------- ------- � ------` --- -- -" �__ _ _ _ ___ ss_ __ ' ------ ------------------ '- ,, �15+�6 ' - , `, ` ,` - �, _ss ----- _ ss-- 1 2 +00 ------_'__`_ ' _ _, ---__ _- -' -- - --------------------------- ---- ' `, -- `� ` . ___—_ ----- ' _ - '� � --- ------------------- ' - �-_ �� ' `� ------ --------------- ---- d ----____--------- __- - -.E1AG24" NaTES _ � ''` `y � �, '1\ '� � \ �.. ----- J Y ___---` �� __ - - �' �. _ .. ----- _______ ____________ `"l! 1100 _ -- --� ---,-,----`---- J------- � HOR1Z BE'M1�EN IX ZQQSSAND�.. � �� � ------------- � z o ------------- �� � #11 S .. ..``` � y -------- --- --------JVEW 24 '-0" (Od _ - -------- __-- ,,,__--____ fiSIDETOUlI �V c ------' +-- --------------------------- -- ' ---- ---- ___-------- _2 MIN CDV�LZOVER PEI�$'3'-0" �'~ , Q ' � _ � ---- -------------'--`- "� !_---`____ _________ ____ ____________`_ -- - - y SAS'Rt�EDE[3�..� � ---- -------------- �� J -___3.__CUTAIVD�F3� MO�iNODQ `� y -� �----------- -------__-- " --- ------�� --- ------------------_---- -SOINST�ILL_TI�PI!'�..P_LACE.CUT IS � ---------------------- __ ---- _ - ---- ___ ___ -- f050 � - EOF�11P1K� �'�_\�'�.. , S ___------------ ---- -----__----- _ ___ -- _. _ ----� _ ___-�---------- ----�- �BLE Is� � � ` , �S_AND------------ -------------- ------ ------"_ _ ------- -' _ -" --------- " _ --__-------------------AC_CORBANCEVttl��= �3N-t�9Z2s., �j-____"__ __` ------------------------------------ ^__ _, `_ _ ,___ _ -- "�-_____----"-..., .,--- _ ------- ----- _ " -_ '- ; - _ � _ � _ �.,_ � _ 130 130 � B00 00' 175 Oa Slope = 0028 Slope = 017 1 � 125 �7 MHHW = 121 57 120 V +ra 1Z0 w w W EXISTING GRADE _ 115 � � 0 115 0 + � . _ ° _ MLLW = 109 83 = �ERO TID - � J � � O »0 � 110 � _ t - — - - - �' - � ` NEW 24'', SS (HbPE�_ _ } - - - � , o "N - - v� � w i 105 � - 1 � z N � Q � � �W G � Q� tn N O t� V' a0 tC'1 N Of I+ 1� a1 M 4Y 1+ 01 O N N C7 < 'Q' � � � ^ p Of � O t0 OS a0 � N O� 1� h t0 � �� CP � � M Q� � P N �[) � O� O'�P a N- a0 a0 a0 c0 a0 aD aD a0 a0 a0 c0 a0 a0 aD 6� O� O O � st O � O M O r O � O � O � O � P � O � o � O � O r O � O � O � O � O �� �� �� �� t � � � � � � � e- � e- � � � , � � � r W ` — W � W � W T W � W � W � W � W � W � W W � W � W � W � W � W � W � W r W � W a — — — — — — — — — — — — — W � 11�00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16�00 � A M J � C V OF MAS � S � , �V a�' '!'� � ° REVISIONS o ,- z Fl � � CITV OB� �REMERTON �+� � NO DESCRIPTION DATE BY EASTSE�E �EACH NIAIN RE�L�CEMEMT shiEE7 a DEPARTMENT OF PUBLIC YYORKS 8 UTILITIES �aTS� g A� #t - ITEM t PLAN SHEET REISSUED 3/2B113 WJD TWO INCHES nT FuLI scal� � � ' ,p IFNOTSCALEACCORDINGLY El�IGIP9�ERIMG DIVI$IOP1 PI.AN AND PGZO�SB.E N 7 w �tarN. � 2 � ORAWiNC NO � oF o .�Q, I7 � SCALE �p� gy TM DESIGN BY WJp CHECKED BY NL S�A�DO�I �O�f'O� �O .�1�A�O�I� �G♦'OO � v HoRIZ 1' e 2p' VERT � e 5 pp'� 3/f3 WASli P E / 34�9) DATE 3/13 WASH P E / 30749 DATE 3/13 a � 5 � LJ �J � � � � � � � � , � �� C � , , 1 � i AN � . WAR 200' R O W IDGE BRE � BRIDGE PIERS c'TM OF BR EMER 10N CI7�' � U U WOODY DEBRIS ? � STA 18+98 ' r ._ _ _ � _ � _ � � AIR RELIEF VALVE __ _ _, _ _ -�'� - _� V �� EX 20" SS (AC) LOCATE VALVE VERTICAL NJppDY DEBRIS �� '� --" ._-.-� �� a RiSERUNDERTHE � - � _ r-- ____- - _ =-- "' - ___SS ^ - -- — - SS--�-... TBB. _ - - - - - - - � - � --- - ' ` BRIDGE CITY TO MARK ' _ _ _ __ �� � _ _ - LOCATION IfV THE FiEtD �� '� � � •' _- �- --�'' ' —_--;�— __ __� � ` � ' , `ss_-__ _ -SS" - --v_ = `_'_`_- sS`-==� -.� ?p � � •• � � � ^ � _ ~ - _ _ ` _ o___ _ ________ _ ______ �-- _.�.�,�_ -__ ___- �-- a___-�__ s --��"� ` �26 00 _ __ -`- _ _s�- .� -� ---�____--__ -__ — - - _t oo " � SS � f �, $ �� , � � - ` �_ _ - ________________ ________________ __ --__ _ �� �� 6, � f ,_ -_-__' ~----- �� ° __ — �..�.___ �_ ��_... / / J — �—._` f_� 4144M1 ` L ^ 4 � " _—_ ,...�___.�._��._._«........__—' �_._.�-.__�� + `l^ ---- �� � ------ -- __---- - # _ -` _ ._ fl-' - - -__ � _ __-_� Q___ -----_ _`_________ --____---- -- _ --__- ^ _ - _- ` �___- _ � _ __ -------------------------- --- ____ _ 1150 � — - -- _ - ____ ___-- _ - - _ _`------ -------------------------------------___ - ---- ____-------- ���' - ---------��=` _--_ ___ _;4=��_-- ----- - _- -------- ` �v_� iVE)fi'ES_ --- __ ____ _________ ___ J ----__ - _ - ------____ _� ------ - ------- " __________- �'� �~ ____ -----_ - ___-^�------ � - �- --__ ----___ - _ -- '„4MAtdt2f?�K��NPkL-t-E ��tfC6Zs1D`---- ��--------_ �`" ' �� -------------- ---'�_ ---_ __---------------- _ - -- - -- -- ----- -- �� 'Y~-MW CbvERDVEFt-MEW?FPE'fS-3'-0"--__-�_-------__` � _ ---------------- '__ -___--------------� �-` l �----- I - ' --- AGAINSi-At7Jlte�RiTT_--------- -------- -----' _______________________ _- - __________ ----------``"~ , - - ----------- - ' � -----�`� � -------�'- '��� - R�OGK�S-AW $Ah1FC718NEED - DR_EIG16b�EWQODYD�� -_____- __________ ____________ _ __—_----~�== =-___- ___ __-- - _ _�T�RE-l1P_AN-------________________ � �`` ---------- -'` _____________ `-- -- _ __ _______ _� . --- ��TIIW�.TAL.L__ P1P�.-P-U10E�'FBEBRIS"=�______________`_i----"_ -=-----�-�`" -;_�--- � , ~ ��� -- __ -� �� - A4:ANOSiIE.DF-BANI4.------- -----�------°-_____ " _ _- - �0� • ' �Z;CC7�M ET�ION__ -_-_ _ ___-_ _- _- �-_ --_ __ -__________- ' �1`-+b4ND6EANE}�DI3�6SE�A�'fIPE-JN--_______________ --------- -____- �` - / `^ ` - __ ____-- - _____ "__---- ___ `-A£Ef�RDANCEyp _ _____�, _----___ ____ -"� ____ �� '� -- --- -- --- -____ ------- - ___ _______ ___ __________--- _____--- _ __------- -____ - - `_`_ ----- -BR�DGEPtERB �' __ ` , __ ---- __ _______--------- _ _____- __------- ,- �-�,' �`--______ -�--------- � _ 130 130 175 00' 200 QO' AIR RELIEF VALS/E Slope = 017 Slope = 005 STR 18+98 125 125 p MHHYV= 121 57 U '� � _ �EXISTING GRADE �...— w 120 w �� _ w � s cn _ _ �. ., 115 o n -. - - - _ o w _ _ � , N 1f5 _ _ __ _ __ b � 2 � NEW 24" SS (HDPE)� - " � ° k O z 0 � - _ _ �_ � 110 Q , p MLLW = 109 83 = ZERQ TIDE � ��Q s � ^ � � lJ � J Z = � 105 = Q 105 N {— � � �/� � /�/� Q �W �VV � Gf N ? tD a0 O N V' tD a0 O oD eh CO O � � P- fD t0 Q O� u7 m V' � N� � N tn � Of � �� � r 1� � � M p) � tCf � fy � p� CY � �� �� CV � pp (O .— � N N N � N N N N t7 M � C� C7 N O O 01 Of � � � � � � � � � � � n ^ � � ~ � n r ~ � � � � � O � � � � n � � T � � � � � o ' o Y � N � � W ^ W � W � W � W � W � W � W � LLf � W � W � W � W � W � W � W ~ W � W � W � W � W � — — — — — "' — — — — — — — — — — — — — � 16+00 16+50 17+OU 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 � P � � aNN z ♦ � � ` P6o � ASH'O9r NO nES�EPnoN IONS DATE BY � 1 2 FlELD B�K `I� � I �� f���ivt�0� {1 �e� �� a A ADE6�ARTMEA�IT OF �UBLIC WOROCS & UTILBTIES �A�TS�LlE BEACH WBA9PS R�PB.AC�MEB�T SHE� � ADp #1 - ITEM 7 PtAN SHEET REISSUED 328/t3 WJD iw� INCr�s a7FUi.c. scn� � 8 � R �•�s �� � IFNOTSCALEACCORDINGLV EINGIPIEERING DiVIS10lV PL/A�I AND PRO�ILE �„� W ,a,,,,, �` �'�3 � SCALE °RAN�"� "� oruru� er n+ oESicN er W.lD CHECKED BY ML ST/�7'SOPB 16+00 �'O STIAT90l�9 21+00 `� � � HORIP i' e 20' VERi 1'� 5 pq7g 3/13 WASH P E� 34�91 DATE 3/13 W0.5H P E. / 30749 DATE 3/13 a 15 � ' 1 1 � � � 1 � � 1 , � � � � �� , L! � �� j � � � � � � � � f � � � � � � � Y ��G � � � f �� , ER► PARK � \ I � �A � ' I � I SN \ � RET I � I �pX I \ � �� i � I JoN� I �� � � � � � WOODY DEBR�S �3 � �2 + 1 � � � EX 20" SS (AC) � � t �� ,. - 1 D � I ' 06 �-- — .. � .. � �' �_ � � � � � ' 8 1 .. — _. -- — __ . -��____ `• _ ' � 12�� � /�. ' ;}—_ __ � � � , _ ----- ___ - -- - �, ,�'��----I---_ ` , - 1 I � � � _- , --- - - , i� `c �' __- � � - � • -°� -- . �'----------� �-. _-_ _----___ � . - - � _ _ _ � _ -�• ,� . �_ –_ , � , ---------_ _____ ,,� _- , _``___-�_- _ __-r" �j � ----- _ _� . •— ________---- ,�' __------- __--~�--""� _ ------ _,�; ',�_______ - - ,� ______--- _ _�-�-- � ---� �__ ' �' l � v _ _ -"� ..'� ------------------ ,°-- � ��� _�____._----ss-=- _---__` � _ -- e__=—ss __ _ss �` ----_�_��`� � - __- - _ , _ � � � �-TOB , , � - .' - �ss �. - ---- _ . , , _-° -_ , � - -_ --` ____ � � - i � ' ss- --- 24 ' ____� #14 �� 1� — / � ___ ' ` _._� -�_� '� ! __ ,115�_ ssl- --- - - -� --------------------� -____ ______-------______----------"_�__��_-----_�__ ,___.----- --_ _ Ss=�-.- � _ _ ------ - -- ______________ --------___ " ___------------- ---__ Z a � __--------------------------------___ _ __-___ ~-'� �° , __ ----------------------- -- _- -------------- '' -----"------------"----___--""`---_____' N - _ � ` _...--'� ---"----- __ ___-_-�__ __ _--------__ ...._� _______________ _ ,.-" ,�.�- ` ------------------ EW24°SS DPE 1100 "'-'_ - w o _� ____________________________------------- -- - _ __ __ _____ _ __ _____ ___ ------- ----- --- �_ o �- �- ` , _ -- _ � }'^� '"�� ~ 110 0 - - - -- ------_ ~� � -IVDTES --------------` _____ _ _ ,,. ____ _ _________ _ '� ¢ 1CJ1L-FtOFFIZ. DIST'BE7VVEEN EX.20"SSAND ----------------- _Y=_ - __---�_ Y -_- _ �__-------._.- - ----- �� ' ----_ u � _,.- NEW,24.-S3i�i8'� r6U'f516E -"___ _ ______ � --- _ ___---- __ " A ____T�3�T[�)_._--:�______________`___'___--^____ _ __ _ _______________-----------__"__ --__________________ 105 0 �-'RI�N CQuER -- ___--------___ ------------------ ;------ -_______ -------___ ` - _3.-'CO_IAPI � AS1�E-�3E{�-��------»_-�-�----------------------------__---------__-_-----------______ ----- ___s�_� - ___-- _ _ - - _ _______-- '`` ^� '��-~'"� �IE-PIPE-PCIC�.`�GLLTflEBR�3�����____ " ______ -- -- ---- --- - - " - --- -______ _____________________�_— - --------------------- ____________ ` _ _ 3 ___-- �---- -- - ---- _______ ____----- ----__ _-- - _— — - `-__—__------- -------------------- - ___ ^�- � ____--kttfNG�flE ___----_________--_- ___ ----- '--------_ _ ,` 100 0 ^� --------- 1 � ` � _ l ____-4~�FlAND6EAIVDDJSQOSEOF� 1000 ----------------------- ________ _ ___ __________________ �-_ _- --___ _______________________ ______ ��` __ ' __ _______ -07.2g___________________ __________ �_ _____- '_-------- 130 130 � 700 00' Slope = 0038 125 125 �l MHHW = 121.57 f20 v v 120 w iu w � �EXISTING GRADE c 115 b o 115 + + N Z � p - � - - - - - - - MU,W = 109 83 = ZERO TIDE � � 110 � - � - ` � - _ _ e _ _ += 10 � � - - - ' NEW 24;' SS�(HDPE)� _ - - - - - _ _ _ _ _ _ � � - - ~ � � W z z � » �/ 105 � 2 x N �- Q � � � d +M � '�� IVV C p - s� � � �p �p �p �.. 1� 1� 0�1 CA GJ T Q� O N N M lh M N �t trl N O � O� OJ I� � t0 � � M N O Q� cQ I� (O � t0 T I� N� aD �O O u7 'V' O a0 1� � N� 1� tD f� (O st � � O� �� � Of M O� � pp �,.� O� a CO � R1 � pp � GD � OD � OD � OD � OD � CO � I� � f� � I� M 1� � 1� � � O � O � O � O � O O �„ O � O � O 6 O O � O O � O � O � O � O � O � O d � W � W � W � W P W � W � W � W � W � W � W � W � W � W � W � W � W � W � W � W � W W� � � � � � � � � � _ _ � � � � � � � � � K � 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 � z ° �r, dOHk �Z U � pe p � 9 y� O9 G ���' "�, REVISIONS o , r flan eooK C�� �� ��������� Cs � No oESCa�anoa on� sr �AS"6'SIDE �EA►CE°9 MAIIV �3EP�ACEN9E6�7' sr,�� � AD #7 -ITEM 1 PLAN SHEETREISSUED 3/28l13 W.lD TWO�NCtiESnTFULLSCALE DEPARTMENT OF �llBLIC WORt�S L� iJTILITIES . w � p � R ]�781 $ � �OsN�i A�D �ROIrBLE N IFNOT SCALC CORDINGLV ENGI�EERI�G DIVIgIO� N ,9 "T�ONAL ,`C 13 � DRAWING NO �� �, . o �� � w,ro CHECKED BY NL STA°PIOSd 21+00 �'O �4A7'80i� 26+00 � 15 � HoRIZ 1' = 20' �Ri' 1' � 5' pq� 3/13 WASH P E/ 3479/ DATE 3/13 WASH P E� 30749 OATE J/13 a � � � � � � , �� � 1 ' � ■ �' � �J , ' r � ( � � � � � ( ( ��G � � , ,� � ( � � � � � I I RP �'� I I ��,GE � BEACH A CCES I � � Rti� � � � N I � � / � I I S �pt�P�' � I I E M� I so 'I_ ' C � P o ECL Wqy� i p G G I I �BORP � � P �E� � /� ( QFE I \ I �� I I w EASEIyE� � USG�MONUMENT I I N B� I PP VI� Q� ( �R K EP I 1 � I B RiP B �SK � � � I �EPN � � I R pV'� I I I I CONCRETE HEADWALL ' I SEMENT ON PRIV TE I I PR WITH 24"�STORM OUTFALL � � � I t� I I I I � I �OPER FOR Ben'�+ I ( � � I � � � I i I 4 I ,3 I 2 I � � � � �9 a cess '8 � I � � �5 � �4 � 13 � 12 / � I 6 I 5 I I I I f � � 17 � � I � I � I I I I I 1 T '� yL- �-�---- I � � / � � To _ __l_ ' ___ o roa � - h '� � -(" _ _,�� ,'_ - �_ - - , _f -roa`. _) _ _ _ - .�� � / � ' ��' ' \��� K � � �Iv I ' _ � - __ ~ t` ____ ( — — — / '(4} VALVE ' _ �__ , i� ___ -,,� _-�-_-_- _�_ '__-�- `• -"� I _ -- ~ '�?p �`. CASELIDS , �---�e �- - -- � -� --- ,_�-_- ___! ____ ___ � -- __--�- ��-�``� � L.�,.-' �T`� - i ,��� ��__ '���__ ___ _��� - I o ._ _ /FORZO°c�rs �� - ss=��-�-_---=-=-ss ___" -~------_- = _ SS " ` _-� _ _ss -, _ i - - _� -___ _�� � / __-___ � _-------- ----�s —____-------�----�=� - ___ -- __ -� ~- _ _ , �� '' _�__ -=-==-� _ �' _� /� / //� � � ' � -- I -- \ ------------^�._ - -----�____------- -� - -��----T - ' ' 8 ~ ��^° ------ -- --------1 ___---- .. yf 0+82 -_ ` _ -- / � _ _ - � _ _ _ ' " � �, � -- - - ;� �� EX 20" SS (AC) �� ___� ��_----______----______ ________------------------_� ______ ~ �"l.%, .�` ``__ �NEW24"SS(HDPE)'___----------------- ----- _____ _______ , � y •- ------ - . . _- '------___ � ' �-----_ ---------- � • --------------------------------------------------__----_ -__ °' -`= N --------------_______ ---- �'� ��.R�MQ1f�`ANDREPLACEROCKROAD 3 �`-�--_ -- -------- �_____________ __-_ ----------------------- F- a '---- -'---___ o ----- NEEDEDa'fTPERF.QRIN-WORK �__-_------------------------------ --_______ � �--_ ^ -`_____ _ -v- __g - -----_ "' --_' -__y_ q ``_ ---- ------------------" f10 0 O �-______ _ __-----_ __ _ ________ _ ______ _ _____ ---____ _____------------__ " -------- --1�_]Y2I�kL - HORa� - BfSTBETVPEEN7F�C-20"-SS-AN[3--___________ '�_.. 1y YY _ - --- ----__ ______ __ _ ____ "---- -------------NEWI-24"_8SiS10�1"�60TS1DETf}fldT-51BEr----____--___ --- -___ a ___ --------______- --" ------ _ --- ' _--_____________ - ~---__�_ _____ _ � PII��TS� �----------_____ ___-- � -- --_ ____ ----- � ' -- - ------------ ° --______ _--- _____ _ CU7ANDREMAY€-WOODI�B€�RISl�PI�EnEQ------- -.------ --___ - `-_ _-________ ---1 � --------- --- - � ------- - ��'6_R`CQIVNF�CTtON -- ' __'_____ --- __ ___JOIN�IAIJTHE'�FPE -___ '`�_ _------__- -- _ __ -- __ ----______ -- ___-- ______ALOWG��OEQFBANK_ ------ �_ ---^�_ 1p ~ ' _ _ ___ --- ---- - ; � - _ ___ _ - -- __ -- _-__ _ 'tiPtGptPE,^_ ____-- __ � IPE�F1 ____ - - O _______ _______ ______ ___ __ - ___ _�� -- `- - -^ - ---_ _ �€-��.. � _ _ __ ___ _______ACC0�2DAI�C�-VW�'H-SE�TION1 ____ ` - - _ ______--- `-:-_ -_______ ---_ J - - '------------__ - -----__ ~~ " ' � r_ `_ 130 130 700 00' 150 00' 132 Oa Siope = 0038 Siope = 014 Slope = 17 125 125 �l MHHW = 121.57 120 � — 120 U W = EXISTING GRADE � 1 f5 o f �„� U5 z � o N � 110 O MLLW = 109 83 = ZERO TID� - , � ` " � - � � � 110 �, _ � _ _ W Q"` " .. -- - _ � � .._ _ _ _ .- ._ « _ _� �jj � ~ _ iNEW 24" SS (HDPE) � _ ` a a w LL � 105 � 0 105 N a H W � 1D0 � 100 u�i � M N � r o rn a n � < m � � a o n c � r ° w N e7 C7 � N �t N 1� �`9 CO N 1� 1� Q) O W t77 V� � � f� � f�- � t+ � t� ^ I+ � t� � tD ��D � t0 N 1� � h � 1� � ao � a0 � oD � C� � O� � p� �, W � O� Q� ^ O O O O O p � O p � O � O O O O O O O � O p � O �O O W �W ' W �L17 �W �W �W �W �W �W �W �W �W �W �W �W T W �W �W �W r W W � — — — — — — — — — — — — — — — — � 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+5U 30+82 E b 30 yN Z � �P � v �� a p Kns O � q REVISIONS o + z Fl� e� ��4Y �F ������"'��� C7 � No oESCwPnoN on'rE er DEPAiiTMENT OF PUBLIC 1MOR0=S 8 UYILITIES �STSO�� B��C6� IIIB�►O9� R�P�AQ'EflflEl�'P SHEET ¢ ' 791 AD #1 - ITEM 1 PLAN SHEET REIS UED 3/28/13 WJD 1W� INCHES AT PUU. SCALE � � �"FCUSreR �.� � IFNOT6CALEACCIXtDINGLY EMBGINEERIPlG DIVISIOPI PLAB19 �IA�B� PROFIL.E M 'IO `� 70NA ��� g SCALE DRAWING NO � aF � F ORAWN BY TH DESIGN BY Y►UD CHECKED BV NL STAVdOB� ZG+OO �O STATIO�I .30� �' HORIZ 1' � 20' VERT 1' � 5' ~ a DAiE 3/13 WASM P E/ 34791 DATf 3/13 WASH P E. � 30749 DA7E 3/13 a W ' � � � � � , � � � ' � � � � � � � � 0 SURFACE MATERIAL STOCKPILE SEPARATELY AND REUSE AS TOP 6" OF TRENCH RESTORATION , 70' OFFSET MIN (OUTSIDE TO OUTSIDE) EXISTING GRADE —� Q' � %. � %: j' %. %, '. .' %�. , � -.' � %. � � � � II�i�/ //// � � I � � �� ��//��//���/ ��/� .�— ;i i �,L� %i;;� �r� ;� �� �i �� �� ��� `-- if� '. � �_ // //% 24" HDPE � �TRENCH BACKFILL �/! ` ��� I- SEE NOTES 1 AND 2 ` ���� � �.. i �T EX 20" AC � ' ` PLACE PIPE DIRECTLY ON 80TTOM OF TRENCH OVEREXCAVATE 4" AND PLACE SELECT NATIVE MATERIAL WHEN DIRECTED BY THE ENGINEER � � � PIPE TRENCH SECTION �YP� VAR N T S PIPE INSTALLATION NOTES t BACKFILL SHALL 8E NATIVE MA7ERIAL STOCKPtLE SURFACE GRAVEL UPSLOPE OF EXCAVATION STOCKPILE TRENCH BACKFILL DOWNSLOPE FROM EXCAVATION 2 WFiERE NATIVE MATERIAL IS GLACIAL TILL (HARD PAN) IMPORT SAND OR USE STOCKPILED TRENCH EXGAVATION AS BACKFlLL FOR 2' FEET OVER TOP OF PIPE GRADE SURPLUS TILL MATERIAL INTO BEACH PER NOTE 4 ESTIMATED VOLUME OF TILL MATERIAL = 150 CY 3 PIPE BEDDING SHALL BE SELECT NATIVE MATERIAL AS APPROVED BY THE ENGINEER SURFACE GRAVEL SHALL NOT BE USED AS BEDpING MATERIAL 4 GRADE SURPLUS MATERIAL INTO THE BEACH TO MAINTAIN A CONSTANT DOVMIWARD SLOPE TOWAROS THE WATER BODY NO LOW SPOTS SHALL 8E PERMITTED !N THE FINAL GRADE 5 DO NOT TRACK OVER PIPE UNTIL FULL DEPTH BACKFILL HAS BEEN PLACED OVER PIPE 6 TRENCH DEPTH VARIES PER THE PROFILE MINIMUM COVER SHALL BE 4' UNLESS NOTED OTHERWISE ON THE PLANS 7 REFERENCE SECTIONS (7-8 AND 7-17) FOR ADDITIONAL PIPE INSTALIATION REQUIREMENTS 6"MIN � � � NOTES 1 HUPE COII.ED PIPE MAINTAIN POSITNE SLOPE TO AIR RELIEF VALVE ROUTE UNDER EX 20 AC PIPE AP1D INSIOE 4" DI PIPE 2 VERTICAL POST SMALL 8E 4 x 4 x i!4 STEEL TUBE HOTDIPGALVANRE EPDXYCOATINSIQE AND OUT PER 7 17 2 ENCASE BOTTOM 4 WITH 16 DIAMETER CONCRETE SLEEVE FOR BALLfST 3 CUT 3" 1MDE X 6" LONG OPENING IN FACE OF TUBING FOR ACCESS TO VAWE AND FITTINGS ROUND COf{NERS AND SMOOTH ALL SHARP EDGES CUT AND SMOOTH pPENING PRIOR TO HDG ACCESSPORT SEE NOTE 3 4 GATE VALVE W! T NUT 4 H�PE ADAPTER (FL X P� -. 4" H�PE 90 DEG BEND (PE� -� 4 HpPE BRANCH SADDtE (PEj ,, NEW 24" SEWER MAIN � REVISIONS o ,• z NO DESCRIPTION DATE F1Y — � ADD 1 ITEM 2 REVISED TRENCH SECTION 3/ 28113 TH TVYO INCHES A7 FULL SCALE AOD #1 ITEM 3 REVISED PIPE P�UG DETAIL 3126l13 TH IF NQT SCALE ACCORDINGLY SCALE HORIZ N/A VERT N�A FIELD BOQK DRAWING NO ORAWN BY TH OATE 3/13 STO C I VALVE BOXASSEMBLY 3 � CONCRETE PLUG � MIN � EXISTING SEWER PIPE I'� / r , __ _____._......._ 1 — T '_ ""' � S i --- --------- PIPE DIA OR 17 MIN WHICHEVER IS GREATER CUT PIPE END NOTE FOR C I PIPE PLUG WITH D i CAP 2 PIPE PLUG DETAIL VAR N T S 2" AIR RELIEF VAWE STRAP TO VERTICAL RISER 2" SS COMPRESSION BANpS {fYP OF � € I I i I t 2 BRASS GATE VALVE ANDCDUPLWG3 ELBOW OUT TO MAKE CONNECTION TO VALVE MOUNTEO ON OUTSIDE OF TUBE �-BEACN GRADE %/�/� �//� � /j� � '� �� j �� _ a �, i 2 HDPE SEE NOTE 1 STEEL VERTICAL POST �� WITH CONCRETE BASE SEE NOTE 2 2 318 SS COMPRESSION CQUPLING 4 X 2 HOPE REDUCER (FL X PE) — 4 X 8 X 16" CINDER 6LOCK �2" AIR RELEASE VALVE ASSEMBLY V� NTS C� , 1 �� �OQ�Y99�9���� DEPARTMEIdT OF PUBLIC WORKS 84 UTILITIES EPEGINEERIIdG DIVISIOM DESICN 8Y WJD CMECKED BY NL WA5H P E �R 34791 DATE 3/J3 WASH P E /f 30749 DATE 3/13 1 i " i , � REUSE EXISTING 34 MAN 6 \� ROCK TO REPIUR WALL , � � h \ �� ESTIMATEDHIGN WATER+t / — / - MATCH EXISTING GRAOE � � "�7\ �I� m �-- 4 �/�`� � _ `.:`f � \ �,���./ � lj COMPACTEp NATNE SOIL � t }" ORAIN ROCK FILTER FABRIC MIRAFI 180N OR APPROVED EQUAL �ROCK WAL RESTORATION AT STA. 1+00 NTS CAST IRON VALVE BOX LID SET 2 ABOVE GRApE 18 — � 1 ' HAN6 TAMP BACKFILL_/ AROUND UPPER SECTION 2 S� OPERATING NUT 4114"DIA 1/8 MIN THICKNESS VALVE BOX OR C I SOIL; PIPE EXTENSION AS RE� 2 1l4" INSIDE WIDTH � � VALVE KEY EXTENSION CONCRETE COLLAR WITM RAISED VALVE BOX i —FINISH GRADE � I I � �CAST IRON VAWE BOX � � TOP SECTION I I VALVE KEY EXTENSION REq D NMEN OEPTH OF OPERATING NUT IS MORE THAN 4 FEET BELOW FINISH GRApE GATE VALVE I NOTES 7 VALVE KEY EXTENSIONS ARE REQUIRED WHEN THE VALVE NUT IS MORE TNAN 4-0" 6ELOW FINtStiEA GR4DE EXTENSIONS ARE TO BE A MINIMUM OF ONE (7) FOOT IONG ONLY ONE EXTENS/ON TO BE USED PER VAIVE 2 VAIVE BOX E%TENSIONS SHALI BE 5" C I SOILS PIPE TVLER TY SEAL 3 ALL EXTENSIONS ARE TO BE MADE OF STEEL SIZED AS N�TED AND PAINTEp WITH 2 COATS OF MEfAI PAINT CS�CAST IRON VALVE BOX ASSEMBLY V � NTS EA�T�'�G pGP�`ie'Y eliAlf� HL�Pu.AC�9veG�T SVA9N�ARD �E'TAi�S a �� SHEET Lf') M 11 � 15 � ' �� � � � � L � � � , � � ! � � � � 18 MDPE 90 DEG BEND w-o +r � �' � _e— � � 18"Xt2' REDUCER EXISTING 12" FLRNGm ACCESS PORT CAPPED WITH BLIND FLANGE USE FOR BYPASS PIPING COMJECTION � J -----,—� �-- --— � t 0 — /0-0 EXISTING 20 AC PIPE i I — l -r — �=� ►�i la � � °' °i a 4 TEM�RARV CONCRETE ECOLOGY � a � � BLOCK STRAPPE� TO PIPE TO AVOID FLATATION DURING CONSTRUCTION (7YP) /�� �" , � � N� B 1B" MDPE 90 OEG BEI� � 20'X18" HDPE REDUCER • 20" H�PE 90 �EG BEND EXISTWG 2A GATE VAIVE I � EXISTING 2U BO DEG BENO (FLj CLOSETO STARTBYPASS � � I / EXISTING 20 GATE VALVE OPEN TO START BYPASS EXISTING 20" HOPE PIPE � � IFf li — ' _ ZO" HOPE ELECTROFUSION COUPLING � — � — NEW 24 SEWER MAIN EXISTING 12 FtANGED ACCESS PORT CAPPED WITH BLINp FtJWGE. USE POR UNE STOP INSTALLATION /' CUT 20 AC PIPE PLUG END WITH / CONCRETE�OWNSTREAMOF f ACCESS PORT � � Qa � i I �.,�ir I � ' . a � �_�=__'--� `/ a N 3 m z R 24" HDPE PIPE SPOOL (FI.XPE� \ p N 0 w s � _ _ _ °--..� .... m , - � � _ _ a - ��"� _ _ ., - - - "-- . _`�"�"=��� - �� _. �..�.�{-r---`:: :� __ 1?I TEMPORARY i8" 9YPASS PIPING SEE NOTE 2 20" HDPE PIPE SPOOL 20" HDPE PIPE SPOOL 2Q HDPE EIECTROfUSION COUPIJNG � _ ,.,-_ _ - -- -- —� �— m� � {�___ � _ ..— � � i � � I I�� i r�l I f � _ __ _ —' — ��,+fl —�— ���� � � _�_ _ \ _ � __ , -- -----lU--� ,�ll- - � � �- - --�-�--lll- -� ` 20" H�PE PIPE SPOOL � I I� EX�STING 20" HDPE CROSS (Fla � ( \ 20" HOPE 22 5 DEG BEND $� ��- � ~- —I-i-f I ii I ����� � "����'�l}'_��w "y' � � �� EXISTING 20" HDPE PIPE TO "� L( o � J ��STING 4 GATE SEWER PUMP STATION CE 7 \ "� VALVE FOR AIR REIJEF IN WEST BREMERTON PIPE � \ ; � ""° I{ �� �' � PLAN TRANSITIONS TO 18 C I I f 20 HDPE 22 5 DEG BEND (FUO�E� I�'� / � O 24 HDPEELECTROFl1S10NCOUPLING �24 X20 DI ECCCENTR�CREDUCER(Fy 1 EAST CONNECTION AND BYPASS DETAIL AT STA. 30t82 MATCH CRONM 6 SCALE t/2° = t — 0" 12" 90 DEG BEND 2 SECTION A—A SCALE 1/2� = t -0" l3� 18 9a DEG BEND NOTES 1 TWO 12' F�ANGED ACCESS PORTS ARE LpCATEQ ON THE EXISTING 20" AC PIPE THESE PORTS WERE TAPPED AND PREVIOUSLY USEO FOR A LINESTOP/ BYPASS OPERATION IN 2005 AND CONTAIN LINE STOP DISCS THE llNE PRESSURE AT THIS LOCATION DOES NOT EXCEED 3 PSI DURING DRY 4VEATHER 2 INSTALL 18" TEMPOR.4RY BYPASS PIPING FROM UPSTREAM 12" FLANGED ACCESS PORT TO 20" HDPE FLANGED ELBOW BYPASS PIPING MUST BE FULLY QPERATIONAL BEFORE EXISTING 20' A C MAIN CAN BE CUT PIPING SHALL BE FULLY RESTRAINED PRESSURE-RATED FOR 1�0 PSI MIN AND TIED DOWN TO PREVENT FLOTATION BY TIDE PIPE MATERIAL MAY BH HDPE DUCTILE IRON OR AWUVA C905 REFERENCE SECTION 7-17 3(1) FOR MORH DESCRIPTIVE REQUIREMENTS ASSOCIATED WITH THE TEMPORARY BYPASS SYSTEM, INCLUDING WORK SEQUENCE 3 PRIOR TO CUTTING AND WELDING HDPE FITTINGS, EXPOSH EXISTING PIPE AND OBTAIN MEASUREMENTS TO MAKE CQNNECTION 4 INSTAIL LINE STOP ASSEMBLY AT DOWNSTREAM EX 17 FLANGED ACCESS PORT INSERT LINE STOP WHEN REQUIRED TO STOP AND DIVERT FLOW THROUGH THE TEMPORARY BYPASS PIPING PROTEGT LINE STOP ASSEMBLY AND CONNECTION AT ALL TIMES 5 TO PREVEhlT THERMAL FJ(PANSION OF THE HDPE PIPE, KEEP BURIED AND SHADE PlPE IF MORE THAN 15' EXPOSED TO DIRECT SUNLIGHT 6 MAKING THE CONNECTION WILL REQUIRE CUTftNG THE 20" AC PIPE REFERENCE SECTION 1-07 29 FOR CUTTiNG AND HANDLING OF AC PIPE I � �`'-_ � / � / � EXISTING 20" GATE V.4�VE [ J EXI3TING 20 HOPE 90 D , � � �/ / BEND (FL) W/ BLIND FW / � � � { REMOVE BLIND FLANGE � / y ItJSTALL BYPASS SYSTE �� / AN� REINSTALL FLANGE — _ _ _ — � S _ '� i� / AFTER REMOVING SYST ! � III III � /q� $ R IIII III � mm � ,�� � /� —��� --------ni ° iii ---� O--INHH- � — � y � in, iii � —� ��� � � I I I I I I \ y I I I I I II � �� �' `--------- ----� ��=-1NH1� I �--- `'' - ��� EXISTING 2A CROSS � SECTION 9-B_ `� SCALE t/2" � 1 -p" � I — -- �j HoR�Z N/A VERT N/A pATE 3/13 WASH P E (� 34�91 pATE 3/1J WASH P E /� J0749 DATE 3/}J � LL � � � � � � ' {� � � � � _ / � , � � � � ' i AFTER AC PIPE IS CAPPED J^-�y ( i E REMOVE EXISTING � 1 12 8LIN0 FLANGE TO � ��-� B EXISTING CYCIONE FENCE � � � � INSTALL UNE STOP � � I � I _ � _ x_ � ��I_I- � - � - X - �-� GATE x '' "� - � I � f � I EXISTING 12" DI RISER (FW I I / I , � ��I ��24"LONG I I � I T6 X2'6"X5-0" r- � CONCRETEBLACK GRADE � I�� I � � i � �EXI3TING CYCLONE FENCE - -� -, - � �I� � � ( I I I � � A � I � Ex 2a' nC I I - - -3E - -�- 3Ert' - �i< - 74-c� GATE � � - � P' - - -L � � �-- - - 1- � � I I EXIST�NG 20 C I SEWER MAIN I I ^ \ _ � _ 1 1 _ _�- ,� / � � , � t I I � I I � I �o � � 1 I ILL I . , .�-- -- U�-�---� I f � LINE STOP I I EXISTING 20 GATE VAl.VE (MJ) PROTECT EXISTING � ' \��STING 20" C 1 SEWER MAW PLUG AT � 20 C I STORM MIUN I � CUT EX AC PIPE EXISTIPIG 20 D I PIPE � I UPSTREAM MH TO STOP FLOW 20 DI SPOOL � yy�n.{ M� Cqp INSTALL TRANSITION COUPIJNG (AC TO DI) I I � 1 I � I exisnroc 20^ c i� I � � PROTECTEXISTING20"GATEVA�VE(UNRESTRAINED) 5 LINE STOP & CAP DETAi STORMMAIN OEMO AND REMOVE EXISTING ZO" HQPE N T S � - BEND AND CONCREfE ENCASEMENT r� L_ � ` �-� -- � = �1 ' DEMO AND REMOVE SECTION OF - - -�- �- - - EXISTING 20" AC AS NEEDED TO MAKE � � 72" DIA VERTICALFtANGED ,��L l _ _ _ � �� _ _ _ _ -E- � ROOM FOR NEW PIPE � ACCESS PORT USE FOR � SEE SEC 1 OT 29 FOR AC VERTICAL FLANGED �\ � LINE STOP INSERTION � I � � DISPOSAL REdUIREMENTS ACCESS P6RT -- � i VERTICAL fLANGE ACCESS FOR LINE STOP I "" � � � � INSERTION SEE DETAi�SABOVE � ABOVE RpCK WALL 1 EXISTING ROCK WALL / � ' ��'��>�>��'�y ./�>�77 - .���'N�Y`�" i���7�/" �� � - �'� = � - -_ - - - - - - � } � _ I �� � - � ._,..1 i .--- � � --• i '� � �� �. � l CUT BXISTW G AC PIPE LEAVING ROOM n - .- --� � -�. .- - - -- � i � T � -� � � � � i' j � � � � \ � � / �� �/ � � �,� �J �� � / � � FOR SPOOL A NO CAP SEE DETAIL 5 ABOVE �--�-r-- � 1� � t �1 h i !\ !�� � \ \ 1 ( \ �`.—�' �_l �_�/� _ J �.._... —�/ � /ti_� �._.� _�J �.__� �J � \J.� � �� y `EXISTING ZU AC ` J � EXISTING ROCK WALL ���\ SEWER MAW Zq 5 SEGMENTED MDPE 90 DEG BENO (Fy t � /�- �,-� 1j -����`� - ��..�� 1 1 - ��� �1���.� k \ ( ,� 1 _J ',� �/ �' � � --� �--� -- -- — 0 2 NEW PIPING P N /� NOTE REFERENCE SECTION 7 17 3(� fOR DESCRIPTION � �� $ SCALE 1/4" a 1'-p" � , OF WORK AND CONSTRUCTION SEQUENCE TO MAKE �° ' CONNECTION AT THIS LOCAl70N � \ ��. � � �� � � � 24 H�PE PIPE 0 ` f _ � Y ° ` t j t _. , _.,.. ... ...d,. ._W w .. , ._ _ .x _ _ . .._ -. _ „ .-...._ ...� .- t " 1 EXISTING P1PE DEMOLITION PLAN � '``-� � - � � �` �" — � � � � � � � � �— � �� �� � ' - SCAIE 1/4 = 1 -0' � � �? TT „W - B .-�ti � II ll � ( ( � EXISTING CYCLONE FENCE �� EXISTING CYCLONE FENCE I� �� 11 I RESTORE EXISTING EMBRNKMENi ti -- _ '_ _" ^ ^ _ I I _� --- WITH RIP RAP T6 MATCH EXISTING � �tr�_ �� ii ii � u i EXCAVATE EXIST(NG EMBANKMENT ` 1 ` TO EXPOSE VALVE AND PIPING \ � `� �. 18 D I BLIND FLANGE �, ( /E7pSTING WC VALVE CAN ,� � �� 18" C905 PIPE SPOOL (FLXPE) y �/ 1�� V REMOVE SEC710NS OF EXISTING �" EXISTING PVC VALVE CAN I� ROCK WALI AS RE�UIRED FOR y � �� 18 0 I 22 il2 DEG BEN� (FL) �� � EXISTING 20" C I STORM MAIN IMPROVEMENTS � � 1 �� RESTORE EXISTING ROCK WALL I� I � �� �� EXISTING 20" C I STORM MFUN UPON COMPLEfION OF WORK .f�. � i � 11� / � '' '�_� ° 24 C905 PIPE SPOQL (CUT TO FIn � � � � � 24" C905 PIPE SPOO� ' 24 � �= p � / /EXISTING 20" C I SEWER MFUN Z , _ � �' , ....i� � J ^ ` 1 � D I BEN� (M�) 1 _. _ _ ' ._ - ._/ ... - _ _ _ _._ _�_ - -�" � � � � ���-�� J , - - - ^ - -� 24" HOPE 5 SEGMENT � I � I _ _ _-,... - ---- - ---'_ � � � � - - -� a �! \ � ^� _,_�"�,,.--- -- 90DEG8END(Fla } �`� w � � - ----- -' �����---"� � 1 ' - 11 �..---- -`--- " � i �!-, �'� �/T��� 20 C905PIPESPOOL(CUTTOffn i � , -.-���^"�.r'� ` > > � � � � -� - -T�\'�\�\����/�%\ .� U r- -� --� EXISTING 20 G! SE1Nfl2 MAIN -"" "'� ^� �/ 24" x 20 D I REDUCER (MJ} � ">��\'�\�j/���R� - „'� ' ' \ m pU��' ' � EX15TMG 20 CATE VRLVE _�/' \ V 24 C965 PIPE SPOOL(CUT TO Fil') u� gTO ' `24 X 18" D I WYE (FL) w ^ �� r . -- �*'� �= 24" D I SOLID SLEEVE (M,n � _ SECTION A—A �`� N 38 DI PIPES� ��,puTF�' �` TOPROTECTHOPE � � �� sco,� �/a° _�—o° �curTOFm 4 S E�TION 8 B ; V� uf a � 9 y� O a � e7� � REVISIONS 0 1' 2 FIELD 800K /�aTY/ �� ppEp���"@���e � m i �I d 8 L7�1 n�� ■ 0\ �p p� ii -p 1� g N Cp�� QESCRIPTION OATE 8'f G/iSYS�D� �EACYi MAIB� IRE��.P9CEMGYY�� SHEET f. DE�ARTMEPIT OF PUBLIC WORKS 8 UTILITIES � W ��� ADD 1 ITEM 1 PLAN SHEET REISSUED 3/28/13 TH lWOINCNE6 AT FULL SCALE 9 p� y� q� yg �a g p �p '�,_'p6p� 1 � IFNOTSCALEACCORDINGLY E�GI��.�RI�G DIVISIOb 9-ESO V�9N���IT��� A■ S�AO�Ol� ��OO M �3 � ��'qlpU� � � � � -}� DRAWING NO � OF g � SCALE DRAWN BY TH DESIGN BY WJD CHECKED BY NL � � 5 j HORIZ N/A VERT N/A DATE 3/13 WASH P E (/ J4797 DATE 3/13 WA5H P E d 30749 DATE 3/13 a LL � � � � � � � � .� �� � � � � � � � ' 1 _� _� � g j �� EXISTMG GRADE ����"' � p > �- � � EXISTING GRA�E � LL� � � a 14 22 1!2 �EG DI BEND (MJ} > a - �10+{ _--___'__ � - r � - � � \�� �\/�/ �� \���/�\//�� � __ I _-- ' _'_'---"l �___.�-,- � �- � � � �t� /" ` �EXISTING 14" PIPE p ,� I �\ _ �_ _ - _ + ` .-� �EXISTING 8" C I PiPE " ( /� � 14 D I SOLID SLEEVE (M.� //" v � �i / � i 8" C900 PWE \ r 14 C905 PIPE ` r � ''^ "`` / N w � �8 C800 PIPE � I } --- 14 C905PIPE ' __ __ __ __ i _ IE ---`�--�" �E --- B°C900PIPE � 14" C905 PIPE �. 4 SECTION B—B 3 SECTION A—A v sca�e s/e° a,�—a° VAR SCAIE 3/8° = 1'-0" A B ( �� I I e 'J � ' � � . , , i i NOTES � / NOTES EXISTING 8 C I PIPE � � � I I 1 STATION LOCATION SHONRJ IS APPROXIMATE POTHOLE TO LOCATE !p �� � 1 STATION LOCATION SHOWN IS APPROXIMATE. POTHQLE TO � ANQ EXPOSE THE EXISTING WYE AND UP5TRFAM PIPING IN Q �Q a EXISTING 14 C I PIPE � �OCATE AND EXPOSE THE EXISTING TEE AND UPSTREAM I I ACCORpANCE WITH SECTION 7 08 TO OBTFUN lAYOUT G � .E��� PIPING IN ACCORDANCE WRH SECTION 7 OB TO OBTAlN LAYOUT I I MEASUREMENTS AND DEPTH PRIOR TO TF� WORK ,p �G MEASUREMENTS AND DEPTH PRIOR TO THE W6RK I I 2 REFERENCE SECTION 7 17 3(4) FOR DESCRIPTION OF VVORK AND Q Q �� 2 REFERENCE SECTION 7 17 3(5) FOR DESCRIPTION OF WORK �( � SE4UENCE TO MAKE CONNECTION AT THIS LOCATION a G 14 D I SOLID SLEEVE (MJ) AND SE�UENCE TO MAICE CONNECTION ATTHIS LOCATION � � 3 WHERE AC PIPE IS CUT AND REMOVED TO MAKE SPACE FOR NEW ,�� �,� 3 WHERE AC PIPE IS CUT AND REMOVED TO MAKE SPACE FOR 8 D I SOIID SLEEVE ' I PIPE HANDLE AND DIPOSE OF iN ACCORDANCE WITH i-0729 t � I NEW PIPE HANDLE AND OIPOSE OF IN ACCORDlWCE WfTH ( C�7 �5 � 74 22}'z DE6 D I BEND (M.� � 07 pg p 0� 8 22 Y DEG D 1 BBJ� (M.� �� � � J��� �14 C905PIPE � P�p �o� � Q / o c G P INSTALL 10" D I CAP (M.� I / ¢ p v �' � 14 22 � OE6 � 1 BEND (M.� � � �- � / �NSTALLB CAP(MJ) � v / C U EXISTING 20 X 10" WYE 14" GATE VALVE (M,i) �� ` cur � �� 8 22 Y= DEG D I BEND (M1AJ) � � �-� EXISTING 20" AC PIPE /� �� EXISTING 20" AC PIPE EXISTING 20" AC PIPE �� EXISTING 20" AC PIPE � ------------ �- --------�------------- �fiF�-� ------------ � ------- i--------------{i�-C��--ffl--------�-- �J �� l I� IJf _ II / —�n, _ _ �ii iii - � -�-�- - - - - _,� —� - - - - - - , � 7 ��� ni - - - - - T ------------- ----�-------- .�-:----------- ----- �� � , ----------- �---------- - ----------------�� � --- - ------ DEMOLISH SECTION OF 20 AC DEMOLISH SECTION OF 20"AC ( PIPE TO PERFORM WORK PIPE TO PERFORM WORK EXISTING 20 X8"TEE ONLY AS NEEDED ONLY AS NEFDEA � 14" C905 SPOOL (P� I ( + + O � � 24 X 14" D 1 RED (FIXMJ) 8 C 900 PIPE 24 H�PE TEE (FL} 24 X 6 HDPE TEE (FL) � 8" GATE VAIVE (FL X MJj 24" HOPE EF COUPLING � 24" HDPE EF COUPIJNG 24" HDPE PIPE 24 HDPE EF COUPLJNG �24 NDPE EF COUPLING 24 HOPE PIPE s _ ,. _ _ �_ e e _ „- - _ '� t � �. r .� , �E s` m e e ,. � _ _ _ , . _ � _ _ , � a A -3» y, _ _ _ _ --- . _ _ _ -_ _ _ _ _ _ _ { � _ ° � � � _ � � _ _ �__ _ _ _ _ � _ _ __ � � '� � ry 1 _ i 3I � rn _ .. �' �... ._.... _ _ `t # I.�? ! .. le # ` ., r ° e,., w _ - _ .=,. �°�_.� � w -=='� -�� w� ,. _ _.... _ � i� -- - --.._,_ ,- Y ._ _ =... n - »� - =•( � _ _ ... -.� .. _ - .s m .- - -a�, > - - r i P � a '((' ,-`�'- � �. t,e.� � ..e ,.�.. � < - - ..�. a - w - ' �ie __ ��r� _ _ _ _ �� _ _ �_ 5 W A 8 � � � 2 SIDE SEWER CONNECTION m SIDE SEWER CONNECTION AT STA 13+87 � AT STA 5+35 N SCALE s/e• = r-o• N � SCALE 3/8' = 1'-0" � � r w , a v �Q' oF NA3N O a G ��/ 3�:� y '' REVISIONS 0 7 y FIELD 800K CI i 1 OF BRE ERTON �� � - NO DESCRIPTI�N DATE BY ��lSTSB�� �EAC�'I MAIPI �E��C�IV�E�� SHEEf � DEPARTMENT OF PUBLIC WORKS 8� UTILITIES � W ADD #t ITEM 1 PLAN SHEET REISSUED 3/28/13 TH nnro iNCHES AT Fu�L scn� �g �p p� �p r � IFNOTSCALEACCOROINGLY EPJGINEERING �IVISIGN Sa�� �EW�R V��V9V�C����S CN '14 a �7pp� � DR4WING NO ln OF g I� � SCALE ORAWN 8Y TH OESIGN BY WJD CMECKED BY NL 15 ~ � HORIZ N/A VERT N/A DATE 3/13 WASH P E /{ 34�9t pATE 3/13 WASH P E � 30749 DATE 3/73 e � � ' � ,� ,� � � � � � � � � _� �� �!' � �� � ENGINEER'S CERTIFICATE The technical matenal and data contained in these Specificat�ons for the City of Bremerton project titled Eastside Beach Main Replacemerot, were prepared under the superviston and direction of the undersigned, whose seal, as a professional engineer licensed to practice as such, is affixed below. a .. P !►d' 1� r _ 1 � 0 0 d �I °"'� � � �` e � � . � Prepared by: � � illiam Dav�s, P.E. Project Engineer Reviewed by: � _, � ��Lever, P E. �aging Engmeer - Utilities �' � � � � � � � � � � � NOTIC€ INVITING BIDS for Eastside Beach Main Replacement RECEIPT OF BIDS. Sealed Bids will be received at the office of the City Clerk of the City of Bremerton, located at 345 6�' Street, Bremerton, Washington 98337 until 2 00 p m PST as shown on the wall clock inside the City Clerk's office on Apnl 2, 2013 for the pro�ect Eastside Beach Main Repiacement Bids received after the specified time and date will not be considered OPENING OF BIDS: The bids wdi be publicly opened and read after 2 00 p m on Apnl 2 2013 in the office of the City Clerk at 345 6"' Street, Bremerton, Washington 98337 COMPLETION OF WORK: The WORK must be completed within 120 calendar davs after the commencement date stated m the Notice to Proceed DESCRIPTION OF WORK: The WORK to be completed under this Contract generally consists of mstalling and connecting approximately 3000 feet of 24-inch diameter high- density polyethylene (HDPE) sewer main on the beach in East Bremerton, abandornng the existing 20" asbestos-cement sewer mam in place, and all other work as identified in the Contract Documents Nearly all the work occurs below the Ordmary High Water Mark (OHWM) on the beach PREVIEWING CONTRACT DOCUMENTS: Contract Documents may be previewed at the � ARC Document Solutions website (www e-arc com) Go to http /lwww e- arc comJwa/tacoma, then click on the link `Enter Public Planroom' Scroll down or search to find the pro�ect � � PURCHASING CONTRACT DOCUMENTS: The Contract Documents may be ordered and purchased from ARC Document Solutions Payment is typically cost of reproduction (non- refundable) Contact Bid Services at ARC in Tacoma, WA 1(800) 337-8103, FAX (253) 272-4064, E-mad tacoma bidserv�cesCa�e-arc corn PROPOSALS: All bid proposals must be made on the blank forms furnished in the '� Contract Documents Sealed envelopes containmg bids shall be entitled Eastside Beach Main Replacement. � BID SECURITY: Each bid proposal shall be accompanied by a bid proposal deposit m cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal The fadure to furnish a bid deposit of a mirnmum � of 5 percent shall make the bid nonresponsive and shall cause the bid to be re�ected by the Contracting Agency � � �� �� PERFORMANCE BOND The successful bidder wdl also be required to provide a PerFormance Bond for 100 percent of the Contract Price Should the successful bidder fad to enter mto such contract and furnish satisfactory perFormance bond within the time stated m the specifications, the bid proposal deposit shall be forfeited to the City of Bremerton PRE-BID CONFERENCE A pre-bid conference wdl be conducted by the City, which will include a walk-through of the pro�ect site The ob�ective of the pre-bid conference is to acquamt prospective bidders with the work and the conditions of the site The pre-bid conference is scheduled for Wednesday, March 27, at 10 00 a m at the City of Bremerton Engineering offices The address is 3027 Olympus Drive, Bremerton, WA 98310 Pros ective bidders are hi h/ encoura ed to attend the re-bid conference. Allow 2 hours for the bid conference and exaect un to one mile of wa/kin4. PROJECT COMMUNICATION All communications related to the pro�ect shall be directed to the City prior to opening of Bids Communication bv phone/fau/e-mad Bdl Davis, P E Telephone (360) 473-2312 Fax (360) 473-5398 E-mad Wdl�am davis@ci bremerton wa us Commurncation by mad Department of Public Works and Util�t�es Engmeering Division 3027 Olympus Drive Bremerton, WA 98310 ATTN Bill Davis, P E CITY'S RIGHTS RESERVED: The City of Bremerton reserves the right to re�ect any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine which bid or bidders is the most satisfactory and responsible bidder and shall be the sole �udge thereof This contract is conditioned on the City receiving a Hydraulic Pro�ect Approval (HPA) from the Washington Department of Fish and Wddlife, and Nationwide Permit #12 from the United States Army Corp of Engineers that permits the proJect as specified in the contract Therefore, the City wdl not award the contract untd these permits have been issued by the respective agencies The City anticipates receipt of the permits in late Aprd or early May No plea of mistake in the bid shall be avadable to the bidder for the recovery of his/her deposit or as a defense to any action based upon the neglect or refusal to execute a contra�t The City of Bremerton hereby notifies all bidders that it wdl affirmatively ensure that in any contract entered into pursuant to this advert�sement, disadvantaged business enterpr�ses wdl be afforded full opportunity to submit bids m response to this mvitation and wdl not be discriminated agamst on the grounds of race, color, sex, sexual orientation or national origin in consideration for an award END OF NOTICE INVITING BIDS � � � '�, � � � � � � � �� ,� ,�, � �� , � �� �� EASTSIDE BEACH MAIN REPLACEMENT TABLE OF CONTENTS ENGINEER'S CERTIFICATE NOTICE INVITING BIDS PART I— BIDDING REQUIREMENTS AND CONTRACT FORMS BIDDER CHECKLIST I— i to I— ii BID FORMS BF — 1 to BF —17 CONTRACT FORMS CF — 1 to CF —12 PART II — WSDOT AMENDMENTS TO THE STANDA6ZD SPECIFICATIONS PART III — SPECIAL PROVISIONS Division 1 — General Requirements D�vision 2 — Earthwork Division 4 — Bases Division 5— Surface Treatment and Pavements Division 7— Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains, and Conduits Division 8 — Miscellaneous Construction Division 9 — Materials APPENDIX A— KITSAP COUNTY PREVAILING WAGE RATES APPENDIX B — CONSTRUCTION FORMS APPENDIX C— BEACH MITIGATION PLAN APPENDIX D— SUMMER TIDE SCHEDULE FOR SINCLAIR INLET APPENDIX E— AGREEMENT FOR LIONS PARK PARKING LOT USE APPENDIX F — CONTRACT PLANS SP-1 SP-56 SP-60 � SP-61 SP-62 `° SP-72 SP-76 THIS PAGE LEFT INTENTIONALLY BLANK � � �� � � PART I ,� BIDDING REQUIREMENT'S AND CONTRACT FORMS � � � � � � � � � ,� �' ,� �, THIS PAGE LEFT INTENTIONALLY BLANK L� � � � BIDDER CHECKLIST This section lists the contract forms required for this pro�ect The bidder's attent�on is especially directed to the bid forms that must be executed in full as required and submitted with the bid BID FORMS � All forms m this section must be executed and submitted to the City with your bid, not later than the designated bid closing date and time Bids that do not include all of the forms, properly completed, may be declared unresponsive � L.! LJ � � l_� � r L� �� � � �� a Acknowiedgement of Bid and Addenda b Bid Certificate c Bid Proposal d Bid Bond Th�s form to be executed by the b►dder and the surety company unless bid �s accompan►ed by a cert�ed check The amount of th�s check or bond shall be nof /ess than 5%(five per�ent) of the total amount b�d and may be shown ►n dollars or on a per�entage bas�s ) e Contracto�'s Registration f List of Subcontractors g Information Required of Bidder h Non-Collusion Affidavit i Certification by Proposed Contractor Regarding Equal Employment Opportunities � Certification of Non-Segregated Facdities DOCUMENTS TO BE EXECUTED BY THE SUCCESSFUL BIDDER The following forms are to be executed and submitted to the City after the contract is awarded by the Bremerton City Councd These forms follow the contract forms in Part 1 Unless noted otherwise, these must be submitted within thirty (30) calendar days after the date of Notice of Award of Contract a Contract b Contractor Certificate c PerFormance Bond for 100% of the Contract Amount d Payment Bond for 100% of the Contract Amount e Insurance Certificates � Cdy of Bremerton March 2013 � Eastsrde Beach Mnm Replacement 1� � DOCUMENTS TO BE EXECUTED PRIOR TO FIRST PAYMENT a Statement of Intent to Pay Prevading Wages - Note Cert►fied Payrr�ll shall be subm�tted weekly to document wages paid DOCUMENTS TO BE EXECUTED PRIOR TO FINAL PAYMENT AND RELEASE OF RETAINAGE a Acceptance of Compensation and Release of All Claims (See Appendix B) b Affidavit of Wages Paid � � � � �r ,� � e � � � �� � � � � ;� Crty of Bremerton March 2013 Easts:de Beach Marn Replacement / il � r � ' � BID FORMS BID TO: ACKNOWLEDGEMENT OF BID AND ADDENDA CITY OF BREMERTON (WASHINGTON) PUBLtC WORKSAND UTILITIES ENGINEERING DIVISION � 1 The unders�gned Bidder proposes and agrees, if this Bid �s accepted, to enter into an CONTRACT with the OWNER in the form included in the Contract Documer�ts to perForm the WORK as specified or indicated in said Contract Documents ent�tled °EASTSIDE BEACH MAIN REPLACEMENT" � � r � � � � ' � ' , ' r 2. Bidder accepts all of the terms and condit�ons of the Contract Documents, induding without limitation those in the Notice Inv�ng Bids and Instruction to Bidders, dealing with the d�spos�tion of Bld Security. 3. This Bid wnll remain open for the perlod stated m the "Not�ce Inv�ng B�ds" unless otherwise reqwred by law Bidder wnll enter into a CONTRACT wrthin the t�me and in the manner required in the "Notice Inviting Bids" and the "Instructions to Bidders,° and �nnll fumish the insurance certificates, Paymerrt Bond, and Performance Bond required by the Contract Documents. 4 Bidder has examined copies of ali the Contract Documents including the following addenda (receipt of all of which is hereby acknowledged) Number 1 Date � ��, �'�„ �� Failure to acknowledge addenda shall render the bid non-responsrve and shall be cause for its re�ectbn 5. Bidder has famdianzed itseif with the nature and extent of the Contract Documents, WORK, site, locality where the WORK is to be perFormed, the legal requirements (federel, state and local laws, ordinances, rules, and regulations). and the cond�ons affecting cost, progress or perFormance of the WORK and has made such independent investigations as Bidder deems necessary To all the foregoing, and including all Bid Forms contained in this Bid, said Bidder further agrees to complete the WORK reqwred under the Contract Documents within the Contract Time sbpulated in said Contract Documents, and to accept in full payment therefore the Contract Pnce based on the Total Bid Price(s) named in the aforement�oned Bid Forms Dated Bidder � C�ty ofBre�nenon Eaststde Beacb Matn Reptocement March 2013 BF-I � r BID CERTIFICATE (if CoroorationJ � ' STATE OF t,���<�..,�,,��.. ) COUNTY OF �-,-.,�� �,�„ ) SS. I HEREBY CERTIFY that a meet(ng of the Boarr! of Directors of the __�,,,,�� �_'�� a cA� ��''�`" i; existing under the laws of the State of __i..... �!'���_, sr•.�r!-��.�. , held on 1 , 2013, the following resolution was du�'y passed and adopted. t "RESOLVED, that �� t� c_� �r,r , ri��r- President o the � oration, be and is hereby authorized to execute the Bid dated �, 2013, to the City of Bremerton by this corporation and that his execuUon thereof, attested by the Secretary of the Corporation, and vinth the Corporate Seal affixed, shall be the official act and deed of this Corporation " ' I further certify that said resolution fs now in fuil force and effect IN WITNESS WHEREOF, I have hereunto set my han and ffixed the official seal of the corporation this ��,�1 , day of > 2013. Secretary ,r.�,._ x�,,,��, (SEAL) � r � � � � � �I crri ofa.�ro„ Eastride Beach Main Replacement M�di 2013 BF-2 � � r � as � ❑I �I � r � � STATE OF COUNTY OF BID CERTlFICATE (if Partnershiol ) � SS. � 11 I HEREBY CERTIFY that a meeting of the Partners of the �� � a partnership existing under the laws of the State of , held on , 2013, the following resolution was duly passed and adopted , ' � , ' ' ' � , � � °RESOLVED. that , as of the Partnership, be and is hereby authorized to execute the Bid dated _. 2013, to the City of Bremerton by this partnership and that hfs/her execut�on thereof, attested by the shali be the official act and deed of this Partnership " I further certlfy that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand this , day of . 2013 Partner (SEAL} Ctry ofe.emerron Easntde Beach Main Replaceme►u Marcli ?013 BF-3 � BID CERTIFICATE (if Jolnt Venture) STATE OF COUNTY OF ) ) SS' ) I HEREBY CERTIFY that a meeting of the P�incipals of the � I� a �oint venture existing under the laws of the State of , held on , 2013, the following resolution was duly passed and adopted. "RESOLVED, that , as of the Jant Venture, be and is hereby authonzed to execute the B�d dated , 2013, to the City of Bremerton by this joint venture and that his/her execut�on thereof, attested by the shall be the official act and deed of this Joint Venture " I further cerdfy that said resolution is now in full force and effect lN WITNESS WHEREOF,1 have hereunto set my hand this , day of , 2013. Managing Partner (SEAL) G51y ofBremertort Mmdi 1013 Eastrtde Beach Main Replacemau BF-4 a _ � ' r ' ' ' a limited liabdity company existing under the Iaws of the State of , held on , 2013, the following resolution was duly passed and adopted , , � � � C A L�mded Liability Company � , � STATE OF COUNTY OF I HEREBY CERT(FY that a meeting of the Members of the ��� "RESOLVED, that and as members of the Limited Liability Company, be and are hereby authorized to execute the CONTRACT dated , 2013� to the City of Bremerton by this lim�ted liabdity company and that their execution thereof shall be the offic�af act and deed of this Lim�ted Liab�lity Company." I further certify that said resolution is now in fuil force and effect IN WITNESS WHEREOF, I have hereurrto set my hand this , day of , 2013 By: Member By Member (SEAL) BID CERTIFICATE Llf Limited Ltabilitv Comcanv� ) ; SS. ' � City ofBremerton Eastrlde Beach Main Replaeement March 1013 BF-3 ' THIS PAGE LEFT INTENTIONALLY BLANK 0 CltyofBremertoR Mmick 20/3 Easisrde Beacli Maln Replacernent BF-6 ' � 1 , � � � � ' ' � ' , ' � ' ' ' , CITY OF BREMERTON BID PROPOSAL for EASTSIDE BEACH MAIN REPLACEINENT (2 pages) NlARCH 2O13 The followrng proposal has both lump sum and unit pnce bid items The Lump Sum items are in Schedule A. The Unit Price �tems are in Schedule B The entirety of the project worlc is included in Schedule A and Schedule B. In the finai column of each schedule, w�e out the pnce in dollars and cents using numerals Tax Note: Rule 170 applies to this proJect. Sales tax shall not be included in the indnndua! unit prices, but as a total for all items. SCHEDULE A— LUN9P SUM BID ITEiVIS B � d Reference Descriptlon Bid Amount Item 1 1-04 4, 1-0S 6 Minor Changes and Force Account "* $150 ,000.00 2 1-09 7 Mobdizatlon 80 Q� O� 3 2-09 Shonng or Extra ExcavaUon, Class B � O� 000.00 4 4-04 West End Beach Access Improvements r� ,r�' ��, 0O 5 7-17 241nch Sewer Pipe 3Op� � , Q� 6 7-17 Temporary Bypass Pumping System 2� ��� � 7 7-17 Connecdon to Ewsbng Piping at Stabon 30+82 T�'Q� Q� � 8 7-17 Connecdon to Existlng P�ping at Statlon 1+00 �O �� QQ 9 7-17 Connecbon to Ewsfing Piping at Station 5+35 ZQ OQO Q� 10 7-17 ConnecUon to Ex�sting Pip�ng at Staaon 13+87 '��� 11 7-17 Air Release Valves �/ Q�D� �Q TOTAL FOR SCHEDULE A ���, oO ** Payment from this bid item is only p�rmitted by written approval from th� Engineer ln accordance with S�etions 1-04.4 and 1-09.6. Crty ojBremerton Eastside Beach Man Replacement March 2013 BF-7 SCHEDULE B- UNIT PRICE BID ITEN9S Bid Ref. Description Unit Qty Uni�t$C�ost Total ($) Item 12 &05 Beach Mitigation and Cleanup Tons 75 �'L�j, � ��j `f y, � TOTAL FOR SCHEDULE B cj� 3'7'�q� TOTAL OF SCHEDULE A AND SCHEDULE B SUBTOTAL OF SCHEDULE A AND B($) g pq 3 �� da ESTI90PIATED SALES TAX � 8.6% ($) Gc� ( 2,f. G RAN D TOTAL ($) � 7 Gt c� 8 t� 2, U Cily ofBremerton Marcli 2013 Eastsrde Beach Mau� Rep/acemeret BF-8 i� �� ' , � , � �.� � ' ' � � � � ' � ' KNOW ALL MEN BY THESE PRESENTS, BID BOND That Roqnlin's. Inc as Pnncipal, and Liberty Mutual Insurance Company as Surety, are held and firmly bound uMo City of Bremerton hereinafter called "OWNER," in the sum of Fl�e Percent (5�) of Bid Amount dollars, (not less than 5 percent of the total amount of the Bid) for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, �ointly and severally, flrmiy by these presents WHEREAS, said Pnncipal has submmed a B�d to said OWNER to perform the WORK reqwred under the bidd�ng schedule(s) of the OWNER's Corrtract Documents ent�tled EASTS/DE BEACH MA/N REPLACEMENT. If the Pnncipal is awarded the Bid and, writhin 10 calendar days after receipt of the Contract Document forms from the OWNER, fads to provide the OWNER �nnth the duly executed Agreement, the duly executed Certificates of Insurance, the duly executed Performance Bond and the duly executed Payment Bond, all as spec�ed in the Contract Documents, then the Surety shall, witNout conditwn and wRhin 30 calendar days from wr�tten demand from the OWNER, pay to the OWNER in U S funds, by certfied or cashiers check, the full amount of this Bid Bond This Bond shall be irrevocable for 90 days after the bid opening, as d�ned in the Contract Documents The Surety stipulates and agrees that the obligation of said Surety shall m no way be impaired or affected by an extension of the time �nnthin which the OWNER may axept such bid and Surety further waroes notice of any such extension In the event suit is brought upon th�s bond by said OWNER and OWNER prevaUs, said Pnncipal and Surety shall pay all oosts incurred by said OWNER in such su�t, including attomey's fees and costs to be flxed by the court StGNED AND SEALED, thts day of APr� � z , 20 13 Rognlin's, Inc � Liberty Mutual Insurance Company � (Pnncipal) (Surety} g gy � � � �?.c�.d.���.ti� Sign ure)�, (S�gnature) Peggy A Firth, Attomey-in-Fact (SEAL AND NOTARIAL ACKNOWLEDGMENT OF SURETI� Address of Surety to which all notices shall be sent 1001 4th Avenue, Swte 1300, Seattle, WA 98154 Address for Service of Process (must be a physical address) 1001 4th Avenue, Suite 1300, Seattle, WA 98154 Crty of Bremerton Eaststde Beach Matn Replacement March 10/3 BF-9 ' THIS POWER OF ATTORNEY tS N07 VAUD UNI.ESS (T 15 PRINTED ON RED BACKGROUND � Thls Power of Attomey limlis tFw acts of tlroge r�d her�, and tlrey have no mWarky to bind tlre Compar�y euept In the manner and to tfia ezten! baeln � Amencen Flre and CasuaRy Company The ��o Casualty Insurance Company CerhRcete No 80277� ' Liberty Mutua! Insurance Comparry West/Merican Insurance Company POWER OF ATTORNEY IUJOWN ALL PERSONS BY TNESE PRESENTS Tf�tAmer�an Rre 8 Cas�fty Company ar�d The Ohio Cas�lty Iruurance Comp�y are corporaUons duly organized under fhe laws of tl►e Stafie of New Hampsture, that L�berty Mutual Insurance Company Is a carporaUon duly organaed under the laws oi the State of Massachusetls, and West Amerfcan Insurance Comparry �s a carpmatton duly organized under the lawa of tl�e Sla�e of Indiana (herem mllectivehr called the'Compames���pursuer� to and by aWionty here�n set torth, does hereby name, cor�sUtute and aemint_ lU1ne E Strieby; Bflrbera A. JohnsOn, Brer� E Heilesen. Chnstoaher f�nvon, Diane M Har�na. Enc A. Zimmerman. Jake Oia. James B all of U�e dty of Tacoma . s�te of WA each indivldualry ff there be more fhan one named, ifs true and law(ul atGomey-in-fact to make, execute, se�al, acknowledge and delNer, tor and on ds behalf as surely and as its act and deed, arry and all undertaldr�, bonds, recogNzarxes end otlier sur�y obligatlons, in pur�ance of tl�ese preserds and shall be as bn�ding upon ihe Companles as if they t�ave been duly sigr�ed by the presideM and aaested by the seaetary of the Companies in their own proper pe�sona � � � � � �� ' � � � m O� �� d� _� c� O� � O m c` W� �� �° �' � >� O Zv IN WITNESS WHEREOF, ihis Power ofAtEomey t�s been subscnbed by an aufhorized oftic� or ofticial oi the Companfes and tl�e corporate s�ls of Ihe Canpanres have been atfixed tl19tIBt0 thls ] � m dey Of �AerCh . 2013 ��9,SSUCAS�j�� 4Fy S�IN� q_ � � ��ytN 4 i � � ;8 � �' � n � � � 190b o o t4ty n� ` 1912 °� � 1491 °� d b x 'O e `�' y a �+ � "+'�¢ +Y.su �r�' ,Jy�ri„iK�.��+ a i,x �r �c� :y Aur * { � * � * STATE OF WASHINGTON COUNTY OF bNG American Fire and Casualty Company The Ohio Casualiy Insurance Company Irberly Mutual Insurance Company WestAmencan Insurance Company ay � � Gregory DavenpoR, Assistant Seaefary On this � 7th day of March . 2013 .�� me personally app�red Gregory W Davenport, who acknowledged fdmself to be the Assistant Seaetary oi Amedcan Fre and Casualty Company, Liberly Mutual Insurence Company, The Ohfo Casualty Campany, and WestAmedcan Insurance Comparry, and that he, as such, bemg authorized so to do, execute the toregang rnstrument tor the purposes tlierel►► coMained by signing on behalf of the oorporatbns by himseli as a duly auU�onzed o�Cer i IN WITNESS WHEREOF, I have hereunto subscnbed my name and atfixed my rrotarfal seal at Seattle, Washington, on U�e day and y�r first above wntten °�'a y � � �.� i �L�,.�rl/,{�--• , NCTARY : B y = vus� c "s KD Rdey . N Pubhc ' � p �� Q9 �,� , ����� W �„\� a,` `` Th� Pow� oiAttomey is r�de and exearted pursuaM to and by authordy of the foltoxnng By�ws ar� AutlrorQaUons ofAmerican Fire and CasuaRy Company, The Ohio Casualry Insurance Company, Liberly Mutual Ir�rance Company, and West Amertcan Insurance Comparryr wh�ch resolutlo�u are now in fuQ force and etfect �ading as fdlows ARTICLE IV — OFFICERS — Section 12 Power ofAttomey My ot(�ceror otherofltcial of rire Corporation aulhomsd far that purpose in wn6ng by �e Chairman or the President, and sub�ed to such Iirnitatlon as tl�e Chairman or fhe Pres�dent rt�y presabe, shaA appoint such a�omeys-io-fad, as may be neoessary to ad m behalf of the Corporat�on to make, exeate, seal, acknowledge and delrver as sureiy a�r and all undertakings, bonds, recognizances and otlrersurety obligatons. Such att�omeys-m-fact, subjed to the hmda4ons set fohh in their re�ecUve a powers of attomey, shall have fup pawer to bind the Corporahon by their slgnaiure and exeartton of arry such instruments arni to atfach tlieteto tl�e s�l oi the Corpaatlon When so euearted, such instrumer�ts shall be as bmding a4 ff signed by fhe Pres�ent end attested to by the Secre�ry My power or suthonry grarited to anyr representaWe or attomey-in-fad und� the prrnnsions of this ardde may be revoked at any tlme by ttre Board, tl�e Chairtnan, the President or by fhe ofticer or oifi�rs grarmng such power or suthority ARTICLE XIII — Execu4on of Conhacts — SECTION 5 Surety Bonda and Undertakings. My offioer of the Company authonzed for that purpose in writing by the chairman or the pre�dent, and aubject to auch llmdahons ag the chalrrnan or the presideM may prescn'be, shall appoird such attomeys-io-fad, as may be necessary to ad m behalf of U►e Company to make, execute, seal, adcnowledge and delMer as s�uety any and all undertakings, bonds, ►eoognizances and other surely obhga4ons. Such attomeys-io-fact subject to the Gmftetlons aet forlh in 1he1r respecdve powers of et6omey, shall have tuQ power to bind the Company by tl�elr elgnature end execWon of arry such tn,gtrumeMS and to attech tlrereto fhe seal of tl�e Comparry When so exearted such mstruments shall be as bmding es K sigr�ed by the president and aaH�ested by the secretary Certlflcabe of DeslgrreUon — The Presid�t of the Comparry, ac6ng pursuant to the Bylaws � the Camparry, autlrorfres Gregory W DavenpoR, Assistant Seaetary to appomt such at�meys-io-fact as may be r�eoessary to act on behaif of the Company to make, exearte, seal, acknowledge and deifver as surety any end all unde�lalun�, bonde, recagnaances and ofher surety obligatlons. Aufhortrstlon — By unanirtrous oonsent of the Compan�s Boerd of Diredors, the Company consenfs that tacsimlle or mechanically reproduced sfgna6ure of any assisTaM secretary of the Company, wherever appeadng upon a certlRed oopy of arry power of ettomey Issued by tl�e Company in conr�tfon wrth surety bonds, shall be val�d and bindfng upon the Compeny wffh fhe same foree and efrect as fhough manually aftbced I, David M Cerey, the undersgned, Ass�nt Seaetary, of Amencan Fue and Casually Company, The Ohio Casualty Insurance Company, tlbedy Mutual Insurance Comparry, and West Amedcan In�rance Comparry do hereby certliy that the ortgfnal power of attomey of which the taegoing le a fuU, true and cortect oopy oithe Power afAttomey exewted by said Comperdes, � in fuU force and affect and has r� been revolced (�, w W TESTIMONY WHEREOF, I have hereunto set my hand and etroced fhe s�ls of se�d Companies tMs ��y bf t"1,,,,,,,,,,� � '_,,,, , 20� �PZyOCASG J �'(YIkS�� " J'y1N51/��Y C�'rtNSUqF�y,, 4 � C� 4 �h 2, � �^ � � PO � � 1906 0 0 1919 � Y 1972 3 r 7941 °� ¢y A� �o a �+� s' � � ty * r2, d,y� ��tS�` �� * y ya„# r Llu� 12873 092072 � �'� � � David M Ce , istant Secretary 101 of 350 R � � m G � � � e � C � O, vy �'W �� �a 0 e+� �� 3� a ° E � �o �� oc �'� 'a >� m� w� �r �� 0 H� l_J �� CI ' ' � ' � � � _J ' , ' ' � J , � ' CONTRACTOR'S REGISTf�ATlON Name of Company_._..._._�.. _ �~��n� , ,� `� . � r�� Address � � , � `°� °� � `� �1 � j_ �� � � uB1 # � � 1- t� �"� �'.��:� License/Registration # and Expiration date ��: � - �'� i� - �_ � �` ;', � ���� �/r�� � t3 License Type `�-- � �' .� ,� Speaalty (if any) Employer's identification number (employer Soc. Sec #) � 1 - �^� °� ,��,��� �l • (not your personal SoGal Secunty number) Employment Security Department number cc`....�.�.� �����..��, ���, { a, Washington Industriat Insurance number � 1 L.n`�,��`�- (�! � City of Bremerton Business License number t�`����� �-,��, �� z� �a �r r c�-��� �1 �� r�-�° • If not Lcensed vinth the City, a hcense must be obtamed before beginning any work. C�ty of Bremerton Eattside Beach Mmn Rep/acemertt Mmicb 2013 BF-!0 , LIST OF SUBCONTRACTORS 2 a es The Bidder shall prov�de the folloHnng infortnabon for each Subcontractor who vwtt perform work or labor or render sernce to the CONTRACTOR in or about the construchon of the work or �mprovement, or a Subcontractor who, under subcontract to the CONTRACTOR, specially fabncates and instans a portion of the work or improvement according to detaded drawings contained in the plans and specficat�ons, in an amount in excess of 10 per�cent of the CONTRACTOR's total bid The 6ldder agrees to submit the list of Subcontractors as part of the Bid or v�n�in one-hour of the Bid The CONTRACTOR shall list only one Subcontractor for each pordon of the WORK as is defined by the CONTRACTOR in its bid. tf no Subcontractor is hsted, the bidder acknowledges that lt does not intend to use any subcontractor whose work on the CONTRACT Hnll exceed 10 percent of the bid pnce. The Bidder's attention is directed to the prowsions of Supplementary Condit�on 6 06.A which st�pulates the percent of the WORK to be performed �nnth the Bidders own forces Fadure to comply with this requirement vinll render the Bid non-responsive and may cause �ts re�ecbon Attach additlonal sheets if r�quired. In accordanc� with RCW 39.30.060, the Contractor shail fumish the names of the subcontractors with whom the bidder, if awarded the contract, �nnll subcontract for performance of the work of HVAC (heating, ventilat�on, and air condidoning), plumbmg as descnbed �n chapter 18106 RCW, and electncal as descnbed in chapter 19 28 RCW, or to name itself for the work The prime contract bidder shall not hst more than one subcontractor for each category of work (dentlfled, unless subcontractors vary vinth bid aitemates, in which case the pnme contract bidder must indicate which subcontractor vmll be used for which attemate Fadure of the prim� contract bidder to submit as part of the bid, o� within one hour after the published bid submittal time, the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to perform the same work shall render the prime corrtract bidders bid nonresponsive and, therefore, void. Note: If there is no subcontract work for HVAC, Electrical, or Plumbing, the Contraactor shall name ttself as th� subcor�tractor and Ust the 96 of work as O%. SUBCON7RACTOR #1 Company Name: p�, � 's Subcontractor License #• Work to be performed: HVAC Address. Phone #: Bid Amount and % of Total Bid. O% S9.BBCONTI�AC�OIt �2 Company Name: L 'S � Subcontractor L�cense # Wor)c to be pe�Formed• ELECTRICAL Address Phone # Bid Amount and % of Total Bid. ° Cfty ojBremerton March 2013 Eastside Beach Mam Replacement BF-ll ' t , � � � ' � ' � , ' � � � ' � ' � � Sl1�CONTRACTOR #3 Company Name� p�, L's j Subcontractor License # Work to be performed PLUN96iNG Address• Phone #. Bid Amount and % of Total B�d• O°/ Sl1BCONTR/�C401t #4 Company Name. Subcontractor License #� Work to be performed Address: Phone # 8id Amount and % of Total Bid SUBGONTRACTOR #S Company Name• Subcontractor License # Work to be performed• Address: Phone #: Bid Amount and % of Totai Bid SUBCONTRAC'1'OR #6 Company Name. Subcontractor License # Work to be performed Address Phone #: Bid Amount and % of Total Bid. SlJ�CONTR�►C40R #7 Company Name Subcontractor L�cense # Work to be performed Address Phone # Bld Amount and % of Tota! Bid Ciry nfBranertan March 2013 Eastrrde Beach dfiun Reploce»rent BF-12 ' INFORMATION REQUIRED OF BIDDER PAGE 1 of 2 The Bidder shail fumish the follouving i�orma�on. Adddional sheets shafl be attached as reqwred Fa�ure to complete these �tems �nnll cause the B�d to be non-responsive and may cause its reJectlon. In any everrt� no award vinll be made untd all of the Bidders General lnformation is delrvered to the CITY. � (1) CONTRACTOR's name and address, mcludmg name of primary corrtact �._��4 r1�� ,n `,�.� ,r'1C_. ��ti t''Ji��_ ���x:=�°��:sv� � C`�f � 1..�J �� �' � �„� `� n � ^ ��.�._7 �C,� !'� y I � � - \ • �-� ��r.�5_ 3�.!�...�� �1 ��1 ..7t��� �2) (3) CONTRACTOR's telephone number � .,?�{, �, �� � �, � - �"--�"" ;�� CONTRACTOR's fax number � ,��;�� � �, � - ��t,.,n �, CONTRACTOR's license. Pnmary classfication � , �v���~ �_� ('�-�,,,,���,-~�tQ� Specialty class�fcahons held, d any: State License No. and Expiration Date _ �-CJ - �'-� � � �''��' ��� � �- �) � � }3 Name of Licensee, d differerrt from (1) above (4) Name, address, and telephone number of surety company and agent who witl provtde the required bonds on this contract: 1� ,`�,x:.�-�� �1�� ���.� �,��.��� ,� ��.-�,. _�� ���� � �,�x� -.��.� ���., �c ��`~� ������ � � .�� �r� _ (5) Name and Pos�tion of person(s) who attended the pre-bid vis�t to the wo�lcsite (if any): Crry ojBremerton March 2013 Eastside Beack MaLi Replacement BF-13 � � ' � ' � ' � � ' � � � ' , �� ' 1 (6) INFORNlATION REQUIRIED OF BIDDER PAGE 2 of 2 , ATTACH TO THIS BID a list of 3 pro�ects completed by the Contractor, that are simdar to the �STSIDE BEACH AAAIN REP�CENBENT project in rrature, value and complexity of work. The 3 projects must have been completed under the bidders name as the pnme (general) contractor wdhin the last 10 years The fist shall include the following information as a minimum o Names� address, and telephone number of owner. o Name of pro�ect. o Locat�on of pro�ect. o Bnef description of the work involved o Contrad amount o Date of complet�on of contract o Name, address, and telephone number of arch�tect or eng�neer. o Name of owner's pro�ect engineer o List of Major Equipment o Years �n business under currer�t name o Contracts now in hand, gross amount C�ty ojBremerton Eastsfde 9each Afidn Replacement Masck 2013 BF-14 ' ROGIVL�N'S, INC. REtORD OF PROJECTS COMPLETED Contract Date �nrner Contact Project Description/Location Value $ Architect/Engineer Cont�d 8 ��� Descri ion North Beach Regional Water System $561,830 00 4/08 Grays Harbor County Gibbs and Olson, Inc Install new Quinault Beach Resort, Ocean Shores, 100 W Broadway, Swte 101 2604 —12"' Ct SW water Ime WA Montesano, WA 98563 Olympia, WA 98502 Attn Kevm Varness Attn Mike Olden 360-249-4222 360-352-1120 Goldsborough Creek Sanitary Sewe� $876,580.20 11/07 City of Shelton City of Shelton Sanitary Improvements 525 W Cota Street Sewer Shelton, WA Shelton, WA 98584 Improvement Attn Dorn Kotas-Turner 360-432-5104 Hoqwam River Crossing $993,803 00 11/08 City of Hoqu+am HDR Engineering Directrona! 609 8"' Street ` 626 Columbia St NW Suite 2A drdling of Hoquiam, WA 98550 Olympia, WA 98501 new water & Attn Bnan Shay Attn Tim Hume sewer Ime 360-5700 ext. 240 360-570-4413 under river Rognlin's Inc. has been in business for 52 years. Contracts now in hand is $30,000,000 � � _ � _ � � � � �/ l� � � � � � _ (� r � � nor,etLix � s i�c �NiP ff Descriptioa � � ' � l.J � i , � � � , , � � 100 Csaoe9 101 1977 NORTElWEST 90TOdi CRA9E-5 AXI.E 102 1978 NORTHiPE3T 90Tati CRANS-9 AXLS 111 19T9 GENENAL 3INGLE RXLE BOOSTER 113 1973 80TOeT NORTH9fEST CRA9ILSR CRANS 116 1989 50TOi6T LIPTKBBLT HYD CRAliB 120 1990 Q!C lOTON BOOI�RTRIICX 121 1996 22TON PTRBLT BOOMITRR-MANITEX i22 2006 zixtc BaLr iio zoa� r.n�°r=cE soa� 124 1994 FORD L8000 7T� SOOM TRUCR 150 Tsucke 6 TtailAre 150 1996 FORD/DAKOTA IyBCHADTICS TRUCR 151 2007 3 7l7�S END DONII� 152 1981 FORD 87.ATBSD TROCR 153 2009 OI�YMeIC TILT DECR TRAILER 154 2007 I�J T800 LOi1HOY TRACTOR 155 1963 TRAII.lJO8IL8 FLATBED TRAILSR 157 1997 MOC[Y OFF-ROSD TRIICH-LARGS 158 2002 GMC FLATBSD DO[�TRIICR 159 1996 REmIPOR'PH WAYBR TROCR 161 1999 BOLLDOG E'LATBSD TRAILER 162 1997 I�CI9VQRRH DDMP TRUCS 163 1997 TROCHiPEI,D 3 AXLE POP TRAILSR 169 1499 BOLLDOG FL�ITBED T1tAIL8R 165 2000 ALLOY FT�ATBED TRAILBR-CTR FRM 166 1994 F9RD CF7000 fiTITH Si�ISSPER i� 2007 xw �eoo � Tavcx 168 2007 RW TB00 DOl� TRUC� 169 2002 H�DE OTILITY TRA2LER i�o i9�e ua�mn$ �rrxLix�r r�L�x 171 1977 E'ROSHAIIF POLL YRAII.ER-FLA?HED 172 2000 FbRD F650 - 3HOP RRIICR 173 1967 FRU6HAOF FLATBED 'PRAILffit 174 1988 GSNERAL TBNDBNI AXLB HOOSTBR 175 1988 GEI�EAAL 30Y"ON JEEP 176 1988 GENERAL 67-70 TON 7.Oi0BOY 177 1971 FRIIS�4QF FLATBED TRAILER 178 2007 JOAA DESRE OFF R(]AD DiJl� TRUCK 179 1989 FttIIF.�►OF 2 A7Q,E END Di1MP TRLR 180 2000 4RAIL KING LOWBOY TRAILE[t 181 2007 SDHN DSERB OFF EWAD WMP TROCR 182 2000 TROCI�ELD 3 AXLE PDP TRAILER 183 1981 AMTDiA HYD ISGeT TOWER 184 2000 BSPROKI'H TBOOB DOMP TRBCR 185 1989 FORD �'►.n'rar_n DUMP TRUCK 186 1992 HOMBlQ►DE DTILZ2Y TEtAiLER 187 2000 R67.IANC$ A1APtIi3OY FLATBED 188 2000 INTHRNATI�iL DOdP TROCR 189 2007 SCOlfOLIlIE 25' TILT DECK 190 1979 TODOO DOLLY-SINGtiE AXLS 191 1942 TRUC36PELD 3 AXLS PUP TRAZI.ER 192 1999 Z11TER1PATIONAL SIDfi DQl� TRpCR 193 1999 EVERGRE� OFFICS TRAI7,SR 194 2011 G6NERAL 3AXLE 35 TON TILT DECK 199 1995 TRIICRiPE7.D 3 AXL6 PDP TRAILER 1990 1981 SIEBffit4 TItY-AXLE TRBILER 1991 1985 'PRAILRING TRI AXLE TRAILER 1992 1997 ?IOXY OFF-RW1D TRUCR - LARGE 1993 1997 MOXY OFf'-ROAD TROCR - LARGE 1994 1998 l�XY OF7-ROAD TRUCR 1995 1998 ffiOXY OFY-1tABD TRpCK 1996 2000 TAAII, RIBiG STEP DECR lRAILER 1997 2008 'PIiAIL BING BEAV$RY'RAIL TRAILER 1999 1996 t�TACHS G(�sIO CRAWLER DIllIPER 20o saeyehoem a nosars 202 2004 J�Di PF.gRE 450 DOSSR � 203 1996 CAT DS DOZSR 209 2006 JOF�+1 DESRS 240 BXCAVATOR 205 2000 HITI4CHI 750 E7CCAVATOR 570T 570T 3AWB3 70-D ATC850 Fi.3►TBED 357 218HSL 7,80�0 W/N8 F800/8000 STR38 LDiTB000 22' 303DT3 T800 40' t�T40 C6500 T-800 7' X 16' T800 TSBCPT 7' X 16' ATCET-53-9 CF7000 T800 T800 (HELDPsR) 24' F650 35' DA85836 DAJ579? 40' 350D DRX7Ql230 RR110E'G 350D TSSCPT 7.5 RA TBOOB £700 AACT-53-4 9700 CP1025TS TSSCPT 4900 8' X 2d' 947-25T 60T3AAR 98' 15524800 4 lPP40R IdT40X 1�3033 1KT30S3 TH80yCS-983 TR70HT CG70 450 l�Ge DSRLGP 240D SX750 LC Equipment Listiag r.i.cense # H49015-FRN 11249 JE'9110 NO LIC-NO TITLE 07597e A00298% A848888 LICENSE �i/A +627850 A00297X 7040TJ T{/4550 8371Y2 B18897A 1Q08520 LICEN$S N/A 809826L 870686B 1300s�i1 A564778 9738L8 1563-XJ 2824M�9 B505743 B18171A 818172A 627BOT 7329TJ 6988LQ B188BOA Z63259 1249JM 6408JH 1272MG JQ1830 LICEN3E 21/A saioJo 3498�W LICF�TS& N/A 3353ND 9vR2136 A83611G 891045L 3394-vG WU6922 846439D 5916TW as9�ie 2291RY LICA43B N/A 54664 eisevz 6706LEt 1992N& 2056�R LICFZISE N/A LICENS$ N/A LICFdi3E N/A LICFa13E N/A 15025U 6090UN LICENSS N/A LICEl13fi N/A LICENSE N/A LICSNSE N/A LICSNSE N/A Serial $ 25940-100109CN97? 20017-2695�-48249C SAH5179 26276 ATC48178 1GDL7DlY6LV511106 1XPALHOXOTD412127 N6J6-8351 1FDYY82S9RVA38471 iFDNF80C9TVA02734 iW91038317A1T2491 1FDYW80Q1BVJ15389 1C9TF36339T997144 1xRDp80Xx7R208704 213881 512086 1GDJ7H1C82J510953 1�tD7C29XXR8731678 4RJF81624X1100929 1NRDXBw[BVR7520B3 1BR1P1539VR110820 4iWF31627IX1100935 5RESB0482Y3000073 1FDI�I70CXRVA29656 iNRDXBOX07R176637 1NRDXBOX9TR176636 WA98206670 o7A7652871 FRX614108 3FDMB6548Yl�115224 WG357501 1G9DAB028JA008036 1G9lliAJ036JA008037 1G9DAl�l086JA008035 FRN439906 D�d350DT609930 1H4D03020KJ037002 1RICJ0.5238YM052868 �350DT619408 18H1P1636YR012492 81097872 1XRDPBOX9YR869776 1FDAIK74P8RVA23513 s�A89147826 SRE3SO489Y3000264 lAT5CAH1�riYx275303 42ETPR03271000927 SiJ7R1856 1BN1P1531NK980500 1HT3HADR3XH6565C6 290141 1G9YAAQ66BA008021 1BN1P1536SK105540 22Q387367651453Aa 1T�04835FT�066215 512089 512083 354205 359170 1TK804832YM100323 1TKA048238MO25697 8060107 T09508X927343 1DD06739 FF290DX605252 17CP005449 01-10-13 Hage 1 Grosa tnsnred Weight Statue 136,900 Inan=ed - Eqp 132,100 Insnred - Eqp None 167,000 Insnred - Sqp 80,200 Iasnred - � 36,000 Insured - Ec�p 54�000 Insuxed - 8qp Insuxed - Ec� 6,240 Insured - Sqp 26,000 Insuzed - Auto Inaured - �to 48,000 Inenred - Auto Inaured - �uto insured - Auto Insurefl - Auto None Iasured - Auto Ineured - Auto insured - Auto 105,500 Inauced - Auto Inswced - Aato Inaured - Auto Inanred - Auto Insured - Auto Inaured - Auto insu=ed - Auto Insured - Att�o Inaured - euto Easured - Auto 26,000 Insured - Auto insured - Auto 43,000 Insured - Anto Inaured - Auto Inaured - Auto Insured - Auto znsured - Sc� Easured - Anto Insured - Auto Insured - 6qp IaBUred - Auto Inaured - Auto 105,000 Iasused - AutO 26,000 insured, - Auto insured - Auto Instuced - Auto Znsured - Auto Insured - Auto inaured - Auto 9,210 Iaaured - Anto NoAe Insured - Anto insured - Auto Insured - Auto Iasured - Auto Znsnred - Auto Noae Noae ' None Noae inaured - Auto 86,360 Insured - Anto Ra�e Insu=ed - � Inen=ed - Bqp Ynauxed - Sqp � Insnred - Bgp C � i b ��.5 � Squip # Description 200 Baothoee 8 Dozera 207 2002 BZTACHI SAXIS 160 EXCAVATOR 209 2007 VOLVO 460 87tCAVATOR 210 2003 CAT D6 DOSSR 211 2003 VOLVO MOTOR GRFIDER 212 2005 IaTACE3I ZX 200 BXCAVAROR 213 2006 E[I2ACHi ZX 160 SXCAVATpR 219 HI?ACHI 7.ONG SO@! 215 2005 HITACHI ZAXI3 330 EXCAVATOR 216 2006 t�ITACHI ZX 50 EXCAVATOR 217 2004 J�IN DEERB 450 D08ER 218 2004 CBAI�IOlT MiDTOR GRADER 219 HI RAM BREAK6R 220 ALLIED HOEPAR C�iPSCYOR 221 2006 ffiTACHI ZAXIS 160 EKCAVATOR 222 2006 SOHN DESRS 160 EXCAVATOR 223 1988 FORD 555 BAC�iOs 229 200T JOHIi DEBRS 350 EXCAVATOR 225 2007 HITACHI ZX50 &XCAVATOR 226 2008 JOFni DESRE 700 CRAWLER DOZBR 227 2008 HITACRI 2X 200 SXCAVAROR 228 2005 2005 HITACAI 8B 50 EXCAI/ATOR 229 2012 SITBC[iI SX 470 S7CCAVATOR 231 1993 CAT D5 DOZER 232 2012 HIRACHI SX !60 SXCI4VATOR 233 2011 HITACHZ SAXIS 16a EXCAVATOR 234 2011 HITACRI �X 200 EXCAVATOR 235 1994 CAT D5 D(?Sfitt 236 2011 RITACHI SX 200 EXCAVATOR 238 1993 J'� DSERE MOTOR GRADER 241 1997 JOHIi DELRE 310 BACRHOE 7AADSR 242 1998 JORN DEERS 310 HACRHOE 7,Q11DSR 293 1997 JOHl1 DEERE 310 BACKHOE I.QADER 244 1995 CAT D8 DOSffit 2S0 LiPts a �oadere 251 fIY3TER CHALLEE�TG&R FORRLIkR 256 PARRERLIER EL6CYRIC l�D1RLIET 259 2004 CAT Y'BLSSCOPIC E'ORRLIbT 260 2004 CAT P�ua.IeT 261 1966 PBSTIBONE SDPER 20 EORRIS@T 262 1983 CATERPILLAR FORffi,IFT 265 YALS FORRLIF7 268 1988 SAAAI ROLLBR 269 1989 SPIDSR 9TgGING 270 ?OYOTA 6000$ FORRLIFT 271 1975 LQLL DYD1A ].17GG&R 20, 0008 277 1999 GBNIE 65' l41NLIF1 278 2002 G6ltIE 65' t+4lLiLiFP 280 1993 Gtt09E 98' l�lILIFP 281 1999 GRORE 60' lANLIET 282 1999 CAT 8000$ Tffi,EEfANDLER FOItP(LIFT 283 1999 CAT 8000� TgLE�DLER E'ORLQ,IFT 289 1997 CAT 8000$ T�.SHAtiDLER FORKLIPT 286 1993 JOHN DEF.RE 310 SACKHOS I.OADER 287 1949 DYNAPAC ROLLER 28B 2002 JU�T DEERB 59 W�BL LOiADF.R 289 2000 CAT 8000$ TSL8B�INDLER FORRLZER 290 1997 CAT FORFCI.IET 291 2005 JOt�T II�gRE 544 9�IiSEL LQ7lDER 293 2007 JQ�i DEBRB 544 WNBEI. LOADBR 299 2006 DYlU�PAC ROIS,FR 295 2008 � DESRE 544 �ESL LOADER 296 1999 JO�IA DE�AB 624 W88EL LOADER 297 2011 JOHl1 DSSRB 544 SPHEEL LOADER 298 2011 J0�1 DSERS SA9 pHSEG LOADEA 300 Smali sqnip�aat 301 ASPBALT CQi'TER 302 c�cRETS snw s sr.Anss 303 WEED SIIR2iSR 160LC SC660BLC D6Nf�CL G8 6 8X200LC ZX160LC LR 65' 8X330LC ZX50Q 450H LT CH6B 880 9700C SX160LC 160LC F555 �TD350DLC ZXSOII �ooJxi ZX200LC3 8XSOII-2 SX470I,C--S D5H XI. ZX160LC-3 ZX160I,C-3 Zx200-3 DSH XL Ex200-3 772BH 330E 310E 3108 D8N 2500 S15-S 15' TS460B 9000 TH4608 20dA V15D-D 5000 Sv91TF FG36 2049 5-65 3-65 MZ98B P9Z66DXT TR83 TH83 TS83 310D CA252D TC548 TS83 DP70-D 544J 544J CA262D 544J 624 544R 544R Equipment I,isting License t LIC6NSB N/R LICBNSE N/A LIC6NSE P/A LIC61T3E N/A LICSN3E N/A LIC6NS6 N/A LICSNSE D1/A EIC6NSL N/A LICBN9E N/A LICBOi3E N/A LICEN$E N/A LIC8L113S N/A C8 LICSNST li/A LICSNSE Pi/A LICBNSE N/A LICI�liS& N/A LICBNSE N/A LICffi�13E N/A LICEN9E N/A LICBNSE N/A LICSNSE A/A LIC�13E N/A LICBIQSE N/A LIC8N3B N/A I.ICSNSE N/A LIC8p3& 1T/A LICSN3E Di/A LICERSE N/A 7132RP Lxca�asE �r/A LICS89E N/A LICSNSE N/A 7,ICENSE N/A I.ICE93E N/A LICEWSS Fi/A I�IC&NSS N/A zic�rss N/A LICFSPSE N/A LICSliSS N/A LICIIYSE N/A LICSNSE N/A LICFRiSE N/A bZCF�i88 N/A L=CF�1SE N/A LICENSE N/A LICENSE N/A LICEN3E N/A 7,ICENSS N/A LIC8A9B N/A LICEN3B N/A LICEN3B N/A LICENSE N/A LICENSE N/A LICF.N38 N/A LICSNSE N/A LICSl1SS N/A LICF.938 N/A LICEH3S N/A LICIIi9B N/A LICENSE N/A LICENS& li/A LICE6SS li/A LICEN3E N/A LICENSE P/A LICEii3S N/A LICSDI3$ ]T/1 Serial i SCNIIF100H00005194 EC46QV80254 AIm00619 G86201015 ARH310955 FFO1F1Qd06328 AAR65A-1 FE'OOAAX910020 FFOIMCQ244670 T0450HX931107 27-09421 0621 1641 FFO1F1Q406394 FE'160IX045719 C782140 SF350DX805838 FP'O1t�CQ24 6162 ?0700JX158519 FFOOA3T320198 £FOIMCC249023 �Jnn70v00030055 8RJ04161 HCM1T100A00011561 HCFI1T100S00011581 HClS1Ul00T00219637 8RJr0a437 HCM1Q100E00219621 DiP772BH540083 To310E7C828216 T0310ESC890 692 T0310EXB34392 STJ03021 ID8782R 577-2001 CATTR460J5L600900 CATTS960CSLF03037 2111 13V01191 L215492 30698 FG30-10281 DLCR101 560-5514 560-8769 28558 P98243 250464 WLlB0705 3RNO2072 3RN01721 3[tBT01396 T0310DG790397 662Z0514 DWTC54H585067 3A�T02i02 9CP00900 DW549JP600185 DW544JP611269 67520696 DSf59AJP619133 DW624GB555737 1DW594SELBD638028 1DW549H2HBD640248 oi-io-i3 eaye 2 Gxosa Iasured Weight statua Inaured - Eqp Inan=ed - Sq}� Insured - 8qp Insnred - Sqp 2asured - 8qp Inaured - S� Noae Insured - Sqp Insured - Sqp Insured - Eqp Insuced - Sqp Noae DTone Insured - Eqp Ineuzed - � None Insu=ed - Eqp Insured - F.qp Insured - Sqp Znsured - Eqp Insured - Ec� InBUred - Sqp Insured - F.qp Insured - E� Insured - Ecgi InBUred - Sqp Inaured - Eqp Inaured - Eqp Iaeured - E� Iasured - S� Insured - Eqp Inaured - Ec� inaured - E� None None Noae insured - Bc� None Noae Noae None None Noae None Iasnred - St� Insured - 8� Iasured - 6� In9ured - Bc�p Inaured - Bqp Insured - Bc� Insured - Eqp Insured - Eqp Insured - E� Insnsed - Ec� Insured - E9P None Insnred - Bqp Insnred - 8qp Insured - 8gp IaBUxed - Eqp Inaured - Sqp Inaured - Ec� InHUred - &qp None None Lfone 1 � � ' � ' � � � � � � � ' ' �� � A ' , � � RpGNLIP'8 INC �P f Description ' � � � LJ � ' � � � � � � , L� � 300 small �ufammit 309 CO1�AClOR-I+�lNUAL GQIDSD 305 AZR ROCR DttILL 306 19T4 ING6RSOLL RAPD-160CF�7 100P3I 307 DROP NAMI�lER W/ FOLLOpPEA 308 CLAM BOCBET 309 DRAGLIlOE $(iCKSR 310 PI7.E LEADS 31� 79 VULCA�i 106 PYLE EtAbII�9ER 312 BILE AA�QlER-DIBSEL LIiiPCBELT 313 6PRBC&IalG HALL 314 JACR �R W/HOSE 6 POIHTS 315 COHCRETS BOCRBT 316 P7.ASHA COiTER 317 19AII,I�G GUN 318 l�D►GNBTIC DRILL 319 GEIiERATOR - Ri,ECTRIC 320 GRINDER - REYWAY 321 GRINpEA - W/ DISC3 322 DRI7.L KOTOR$ 323 ROTO �1l�R 324 LRDDER 325 LA3ER LEVEL 326 TRA313IT LEVSL 32? I�CHINERY ROLLgRS 328 PULlP 2° CFdiTRIFQGAL ELECTRIC 329 PU1�P 3° TRASH - NOREfAL 330 1982 6" IT� MARLpW DISSSL PQAfP 331 SAN - CHAIH 332 3A90 - 1�1'AL CflT OFF, CARBIDS 333 SCAE'FOLDING PLANR - ALOMII7I�! 334 STAGIAG (SAFCf�1Y) - 5' SBCTION 335 SEAVZCE PANSL - II,ECTRIC 336 P2PE SHREADIFIG ffi1CSINE 33? COTTING TORCH 338 WELDER - �LFCTRIC7►L yi/LSADS 339 AIR ARC ATlACi@�1T 340 NBLDER - GAS 6 DZES6L 341 iIELDER - 4 YACR E7.SCTRIC 342 W9Effi. BARAppI 343 WORK PLBTE�ORMS S MAN BAS[�T 344 VIBRATOR - CONCRETS 345 CAAIN CQM�A-LONG (6 TON) 346 CilAZN C�-A-LONG (3 TOP) 347 C]lB7,E CL�-A-IAAG 348 xYUa�►ar,�C JnCx 349 PORTA PO➢PER N/JACK 350 PDLLBR - 50 TON 351 SLBCTRIC JACR �ER 352 BLaWER FAli 353 3Aii - PORtA eAPD 359 PILE O10 PILE Hal�R 355 ICE 216 vSBRO HBlu�II'sit /PWR PAC 356 STEP DOiPI� TRANSPORl�R 357 DIAL INDICATORS 358 2006 6" WACREIt Wl�TER POMP 359 GROOT PUliP 360 1995 IEIGERSaLL A71ND GSNERATOR 361 16' HOHSSI�II�DE STSEL BQAT 362 1985 HCMAG ROI.LER COI�ACROit 363 PALI.ET JACRS 6 HOORS 364 SLECTRTC WINCH 366 C�1-D(OR I�R?AR HI7CEIt 367 1tIVL�"i' 8o3TER 368 S�LL COl�tPRB330RS 369 CORE DRILL - QP TO 4" BITB 370 SPAC� HBATERS 3T1 IMPACT qltF.NCH83-AIR/LLSCTRIC 372 AIR TQGGLR HOIST-SLEC NOIS? 373 HYDRADLIC HOLS PQNGH 374 AIR SCALER 185CM 106 520 6EK18 'Z9� - Z8' 6° POAlP TRLR E-50 BW609G M@ - ELBCTRI Fq¢ipment Listing License � Serfal $ LIC6NSE N/A LICQiSE H/A 97950H LICENSE N/A LICENSE N/A LZCELI3E N/A LICEN3E F/A LICBNSS B/A LICENSE N/A LICF�J9E N/A LICffii3E N/A LICffi9S8 N/A LICSNSE N/A LICSN3E N/A LICBNSS N/A LIC�iSE N/A IaICStd3E N/A LICENSE ft/A LICffii$S N/A I,ICSbiSE N/A LICSNSE BT/A LICSN3E H/A LIC6HS8 N/A LICEN3E IQ/A LIGEHSE N/A LICEH3B N/A LICSAS& ld/A LICENSE N/A LICENSE N/8 LICENSS N/A LICSIISE N/A bICENS$ li/A LICENSB N/A LICL�'Ei3$ N/A LICffi�i3S N/A LICF.t�SL N/A $EB �OTFS LICENSTs N/A LICSliB& N/A LICH�IS& N/A LIC�1S8 N/A LIC�ISS N/A LICB�38 N/A LICFdOS$ N/A LICSNSB tl/A LICEBSE N/A LICEN3S li/A LICENSE N/A LICE9SE N/A LICEli38 N/A LICSl1SS N/A LIC�Li36 N/A LICSBSE N/A LICEN3E N/A 8370VZ LICBNSE N/& 5733XC LIC�I38 N/A LICEN3E 11/A LIC�138 1I/A LI�19E H/A LIC�i3B3 N/A LICEN3E N/A LICF�i9E N/A LICIIiSE N/A racsetsS aIA LICBl1SE N/A LICENSB N/A 7,ICEtlSE N/A LICEN$E N/A see Notes GD-9030 670499 3]0940TC 48635 182118 46`�1FO1229�019561 251582IIRF811 201868 331044 01-10-13 Page 3 GrosB Insured Neight Statue None None None NoII6 None None None Noae �lone None None None None None None NOriB None None NOR6 None t�7one NOAe None Noae None 1COAe None None 2tone Nqae �oae �TOn6 �one �ione lTone None None None Nane Hone None None None None None None Pone Acne Rone iPase Noae NOII@ None DTone None None None None None Noae Noae None None None None None None NOA9 2ione xoae � ' � ROGNLIDi'8 INC �D i Deacription 300 �s7.]. Ecmip�ent 375 RABLB SAN/MITER SA11 376 2002 SUL AIR C�lPRESSOR 1!2/3 377 2RESSpRB WASHER 378 Q9ART8 P'LOOD LIGFIT3 379 SAN SAL7, 380 DI8 GRINDSR 381 VACOO� CLBANER3 382 AIR DRILL 383 3lW.L AIR SPRAYER - PAINT 384 LARGS AIR SPRAYER - PAINT 385 SRIL SA1P 386 SAIiDBLABTIWG E�IIPMENT 387 GAS P09T HOLB DIGGSR 388 PORTASLE aIRE FEED3 389 LqQLTIQIIIP 351� GENERATOR 390 25 RVA G6NERATOR 391 enRi'l18R H1cn c�cRErs st�iP 392 1993 NcT.�r.raN 3400 CAI, OfATBR 4ANB 393 IlTG�ASOLL RAND COMpRBSSOR 394 1994 3Sqo�ITIAL ARR�iBOARD TRLR 3S5 LANGB $RIISH FAN-SLED MOUNTD 396 RAS�IDSSBN 7.INE SE�ooI.EEt 397 1999 SULLIVAld COt+IPItESSOR-210CFlt 398 STO[� BPLI�TSIt 399 GOlQ1C0 FINISHIaTG MACHINB 400 Mimo. Squip�ent 902 RADIOB - CELLDIlAA PH0�8 903 MISC EQpIRN�lENT 405 RIGGING 410 AIR TESTING P�l23 411 NP�GAYIVE AIA I�ACHINS-2000 CFlI 415 BEDDING CONVSXOR 416 2003 CO�TCRHTE P[JLVERIZSR 450 AlISC 3AF6RY EQIIIPHElFP 452 1993 4 ifHEBLEEiS 956 1995 ROSCO 30E8pER 457 1997 ALTEC POWER AOGEEt 45B TRffiiCi1 BOXSS 459 1997 A�PAR C�[BACPOR FOR BACRHOFS 960 1998 LARGB P71lTS COM[�ACTORS 961 1999 FLBXIDRILL DIRECTIOI�I DRILL 463 8L6CTRICAL DISTRIBOTIOA BoX 466 2005 ELECTRIC FUSION MAC�ttS 476 L83BR BLI�7T 1�4►CFtINB 4T7 2005 17' FLAT BOTTO![ BO�T 4T8 SQITC�I3B BPiRS FEED 979 2007 SVPBRIOR BR00lS SWEEPER Bgnipment Liating Licenae � LZCFd73E N/A 3BE �OTSS LICENSE N/A I,ICENBB N/A LICEN8E N/A LICEN3S N/A LICENSB B/A LICED73S Dl/A LICENSE N/A bICEASB N/A LICENSE H/A LICS�I3E N/A LICBl1SS N/A LICEEi9S N/A DCA40SSAI bICEN36 N/A DCA2533AM 0482SR R3500 LIC�3E N/A I,ICEN3B N/A 1900 CI+�! R68715 LICEB$S N/g 3-53 DI83SL LICElT38 N/A LICEN$E N/A D210QH5B 1629XJ SP300 LICEPiSE !1/A C-450X LICIIT3B H/A LICS�ISE B/A LIC�iSS A/A LICEliSE ld/A LICfiNSE N/A FA2000EC LICENSS N/A LICEltSE A/A MCB800 LICENSE N/A LICEN38 N/A LIC�S4ISE N/A RB48 I,ICENSE N/A 76BA54A035 LICENSS N/A LICBNSE N/A TELEOYNE TC9 I.IC$NSE 1J/A BP[i3345A LICEASE li/A LICEBSE N/A LICEHSE 1P/A rac.�ess r�/� LICERSE R/A HOAT STsE NOTE8 LICE�SE N/A 4045D LICEDi3E N/S Serial # 3610807 i�Il498190075 2110036/2313060 SR34079389 168T1578B594 159A11O17RL35B228 16514A �12308-08 001687 978TS1507PA502580 39020 22863 1131831 12981012 FR023046� AWH2O986D405 807512 O1-10-13 Page 9 Groas Inanred i4eight Statua None [�one None Noae Nons NoIIe None None None None None None None None None Name �iaa�e 6,000 None Nane ilone lQone 1Q�8 �one liane lione N�e tione lioae NoIIe Noae None eone POIIB NOae &one None Aone None l�one Fone xone t�one None None aone tione 1 � , � �_' � ' � � � �� � � � � ' � � � , � C Rognlin's Inc. - Key Personnel � � � � � Individuals Present Position Years of Magnitude and In What Capacity Name or Office Const Type of Work Randy Rognlin President 38 All sizes and phases Supervisory/General of General Manager Construction Rodney Miller Eshmator/Pro�ect 49 All sizes of General Project Manager Manager Construchon es eciall brid es Floyd Plemmons Eshmator/Pro�ect 36 All phases and sizes Pro�ect Manager Manager of general construchon es eciall build►n s Dave McAllister Project Manager 35 All phases and Pro�ect Manager sizes of general construchon Bill Slusher Esdmator/Pro�ect 28 All phases and sizes Pro�ect Manager Manager of general construchon Brian Thompson Eshmator/Pro�ect 24 All phases and sizes Pro�ect Manager Manager of general construction De�ay WiAiamson Estamator/Pro�ect 15 All phases and sizes Pro�ect Manager Manager of general construction Nick Rognlin Estrmator/Project 13 All phases and sizes Pro�ect Manager Manager of general construction Kirk Hollatz Safety Manager 13 All phases and sizes Safety Manager of general construction Craig Espedal Pro�ect Manager 5 All phases and sizes Project Manager Assistant of general construction NON-COLLUSION AFFIDAVIT STATE OF t..��'.��,,.,,,,,�� ) ) ss COUNTY OF �., �,,� �., �,r � ) �� C� ,�.� .sr , being first duly swom; deposes and says that he or she is of the party makmg the foregoing bid that the b�d is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, orgarnzatron� or corporation, that the bid is genume and not coliusive or sham, that the bidder has not directly or indirecUy induced or solic�ted any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, conrnved, or agreed with any bidder or anyone else to put m a sham bid, or that anyone shall refra�n from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, commurncation, or conference with anyone to fix the bid pnce of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid pnce, or of that of any other bidder, or to secure any advantage against the public body award�ng the contract of anyone interested in the proposed contract; that ai) statemerrts contained in the bId are true, and further. that the bidder has not, directly or �ndirectly, submitted his or her bid pnce or any breakdown thereof, or the contents thereof� or dnrulged information or data relabve thereto, ar paid, and wiN not pay, any fee to any corporation, partnership, company assoaation, organiza�on, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid Signed• �1 � e���u �lra,r�.de .� Subscnbed and swom to before me thi �� day of , 2013 Notary Public in and for the County of t;.,�l(`�,� ,� �`, ��"'° State of +� `` � (SEAL) r ANN � '�CKINNEY �p; � NO7ARY PUBUC � : STAT� OF WASHING'fON ; � My ColNlld�bfl E� �' �' � � w esw��e++r�w sw'so�+wsn�w�� Ciry ojBremerton Manch 10l3 Eostsfde Beach Maln Replacement BF-1 J � � � CERTIFICATtON BY PROPOSED CONTRACTOR REGARDONG EQUAL EAAPLOYMENT OPPORTUNITY In accordance with Chapter 56, Laws of 1975 1 st Extraordinary Session, 1 Certification regarding Equal Opportunity is required of bidders or prospective contractors and their proposed subcontractors prior to the award of oontracts or subcontracts. � � ' � � , C 1 � ' ' � � � Name of Prime Contrac�or � � � Address: �� . � . '�-ra� �. ��, � ,�� g ���� �,�,� �c`� ��, Intemal Revenue Service Empbyer ldentification No i- C�`l ��."�`�1 a. Contractor has partiapated in a previous contract or subcontract sub�ect to the Equal Opporturnty Clause. b. Compliance reports were required to be filed in connec�on with such contract/subcontract. Yes ✓ No Yes � No c. Contractor has filed all compliance reports required by Yes � No Execubve Orders 10925, 11114, 11246 or by regulations of the Equal Opportunity Commission issued pursuant to Ti�e VII of the Civil Rights Act of 1964. d. If answer to item 'c' is "no", please explain in detail in the space below. CERTIFICATION. I, the undersigned� certify that the infoRnat�on above is true and complete to the best of my knowledge and belief. � and Title of Sigrlr�r (please type or print dearly) Signatur Clty ojBremerton Basuuie Beach Mcln Replace»ient � Date March 2013 BF-16 � CERTIFICATION OF NON-SEGREGATED FACILITIES (Applicable to federally assisted construction contracts and related subcontracts exceeding $10,000 which are not exempt from the Equal Opportunity clause ) The federally ass�sted construction contractor certfies that he does not maintain or prov�de for his employees any segregated facilities at any of his establishments, and that he does not permit his employees to pertorm their services at any location, under his control, where segregated facdities are mamtained. The federally assist� construction contractor certified, further that he will not maintain or provide for his employees any segregated facilities at any of his establishments, and that he will not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained. The federally assisted construction contractor agrees that a breach of this certrficat►on is a violation of the Equal Opportunity clause in this contract. As used m this ce�tification, the term "segregated facdities" means any wait�ng rooms, work area, rest rooms and wash rooms, restaurants and other eating areas, time docks, tocker rooms and other storage or dressing areas, parking lots, drinking fountains� recreation or entertainment areas, transportation, and housing facilit�es prov�ded for employees which are segregated by explicit directive or area, in fact, segregated on the basis of race, creed, color� or national origin, because of habit, local custom, or otherwise The federally assisted construction contractor agrees that (except where he has obtained identical certifications from proposed contractors for speafic time periods) he will obtain ident�cal certifications from proposed subcontractors pnor to the award of subcontracts exceedmg $10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such, certifica�on in this file. � ����� Signature Date �� Name and dtle of si�t?er (please NOTE: THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL END OF BID FORMS Crry af Bremenon Mamk 20�3 EasLSide Beach Main Replacement BF-17 � � `J �� CONTRACT (page 1 of 3) � THIS AGREEMENT is dated the � day of � in the year 2013 by and befinreer�City of Bremerton (heremafter called CITI� and , 1 (heremafter ca � � � � � CITY and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows ARTICLE 1. WORK CONTRACTOR shall complete the WORK as specified or indicated in the CITY's Contract Documents entitled EASTSIDE BEACH MAIN REPLACEMENT ARTICLE 2. CONTRACT TIMES. The WORK shall obtain Substantial Completion within 120 calendar days from the commencement date stated in the Notice to Proceed: Phase 1(reference Sect�on 1-04 12) Time is of the essence as to each and every deadime set forth in this agreement This provision has been specifically negotiated � ARTICLE 3. LIQUIDATED DAMAGES. CITY and the CONTRACTOR recognize that time is of the essence for this Agreement and that the CITY wdl suffer financial loss if the WORK is not completed within the time specified m Article � 2 herein, plus any extensions thereof allowed in accordance with Section 1-08 8 of the Standard Specifications which may be modified by the Special Provisions They also recognize the delays, expense, and difficulties mvolved m proving m a legal proceeding the actual loss suffered by the � CITY if the WORK is not completed on time Accordingly, mstead of requiring any such proof, the CONTRACTOR shall pay the CITY liquidated damages m the amount of $1,500 per day after the date of Substantial Completion � � ARTICLE 4. CONTRACT PRICE. CITY shall pay CONTRACTOR for completion of the WORK in accordance with the Contract Documents in the amount set forth in the Bid Proposal, which shall include sales tax as provided m Section 1-07 2(2) of the Special Provisions ARTICLE 5. PAYMENT PROCEDURES � CONTRACTOR shall submit Applications for Payment m accordance with Section 1-09 9 of the Standard Specifications which may be modified by the Special Provisions Applications for Payment wdl be processed by ENGINEER as provided in the Special Provisions ' � , Contractor Irntials Cery of Bremerton March 2013 � Eastsrde Beach Ma:n Replacement CF-1 � � CONTRACT (page 2 of 3) ARTICLE 6 CONTRACT DOCUMENTS. The Contract Documents which compnse the entire agreement befinreen CITY and CONTRACTOR concerning the WORK consist of this Contract and the following attachments to this Contract o Notice Inviting Bids, o Bidders Checklist, o Bid Proposal mcludmg the Proposal Forms, Information Required of Bidder, Bid Bond, and all required certificates and affidavits, o Performance Bond, o Payment Bond, o Standard Specifications, o Amendments to the Standard Specifications, � o Special Provisions, o Appendices o Contract Plans, o Addenda numbers � to I , inclusive o Change Orders which may be delivered or issued after Effective Date of the Agreement and are not attached hereto There are no Contract Documents other than those listed in this Article 6 The Contract Documents may only be amended by Change Order as provided in Section 1-04 4 of the Standard Specifications which may be modified by the Special Prowsions ARTICLE 7. INDEMNIFICATION. The CONTRACTOR and CITY acknowledge and agree that they have negotiated the following m accordance with the requirements of RCW 4 24 115 and the CONTRACTOR specifically waives his immurnty under industrial msurance under Title 51 RCW To the fullest extent permitted by Laws and Regulations, the CONTRACTOR shall mdemnify, defend, and hold harmless the CITY, ENGINEER, their consultants, subconsultants, and the officers, directors, employees, and agents of each and any of them, agamst and from any and all claims, m�uries, damages, losses or suits, including all legal costs and attorney fees, all claims and liabdity ansing under, by reason of, related, or mcidental to the Contract Documents or any perFormance of the WORK, but not from the sole negligence or wdlful misconduct of the CITY and/or the ENGINEER as further defined in the Contract Documents The provisions of this section shall survive the termination of the contract Crty of Bremerton March 2013 Eaststde Beach Marn Replacement CF-2 LJ IJ � � LJ L� � � � L_ � � ' l� � � � _J 1 � � � � ' Contractor Irntials � ' � � � ' � � , , � � � , � ' � CONTRACT (page 3 of 3) ARTICLE 8. ASSIGNMENT No ass�gnment by a party hereto of any rights under or interests in the Contract Documents �nnll be bmding on another party hereto without the written consent of the party sought to be bound, and specifically but without limitation monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and uniess specifically stated to the contrary m any written consent to an assignment, no assignment wdl release or discharge the assignor from any duty or responsibdity under the Contract Documents The CITY, in its sole discretion, may refuse to allow the CONTRACTOR to assign any or all of its duties, rights and/or responsibdities under the Agreement, except with regards to an assignment of funds for security purposes In the case of an assignment for secunty purposes the CITY may condition its approval to the extent it deems necessary to assure that there wdl be adequate funds to complete the WORK and to pay a subcontractors and suppliers CITY and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contamed in the Contract Documents IN WITNESS WHEREOF, CITY and CONTRACTOR have caused this Agreement to be executed the day and year first above written CITY By ��1 � ' Attest � Ad ress for giving notices < < Address for giving notices 3 � �r � � ��� i��-��� � �� ���� � de� ���.Q�!� =---T �_ ' �, � � ' License No ��—C� �-������ .!� .� � �� c r � ` A '��� � , Agent for service of process (Signature �► .i�1r.±L.� C:ty of Bremerton Eastsrde Beach Ma�n Replacement March 2013 CF-3 � CONTRACT CERTIFICATE (if Corporation) STATE OF \��G.Jh� �1�) ) SS COUNTY OF �V�y��Y I HEREBY CERTIFY that a meeting of the Board of Directors of the �S � C. a corporation existmg under the laws of the State of �� , 2013, the following resolution was � � ' � � � OY1 , held on passed and adopted � "RESOLVED, that 0� 1 1 , as � President of the Corporation, be and is hereby authonzed to execute the CONTRACT dated , 2013, by and befin+een this Corporation and City of Bremerton and that his/her execution thereof, attested by the Secretary of the Corporation, and w�th the Corporate Seal affixed, shall be the o�cial act and deed of this Corporation " I further certify that said resolution is now in full force and effect IN WITNE�S �1VHEREOF, I have hereunto set my hand and affixed the official seal of the corporation this �,'�_, day of , 2013 Secretary - �� " � , �, (SEAL) _ . `�i �° . , � � r � 1 m � � I i 1 � i � J � � i C:ry of Bremerton March 2013 Eaststde Beach Matn Replacement CF-4 � � , ' ' � � �_� , � � STATE OF COUNTY OF CONTRACT CERTIFICATE (if Partnership) ) j SS I HEREBY CERTIFY that a meeting of the Partners of the a partnership existing under the laws of the State of , held on , 2013, the following resolution was duly passed and adopted "RESOLVED, that , as of the Partnership, be and is hereby authorized to execute the CONTRACT dated , 2013, by and befinreen this Partnership and City of Bremerton and that his/her execution thereof, attested by the shall be the official act and deed of this Partnership " I further certify that said resolution is now in full force and effect IN WITNESS WHEREOF, I have hereunto set my hand this , day of , 2013 , � SEAL � ) � � � � ' Ctty of Bremerton � Easts�de Beach Marn Replacement Partner March 2013 CF-5 CONTRACT CERTIFICATE (if Jomt Venture) STATE OF ) ) SS COUNTY OF ) I HEREBY CERTIFY that a meeting of the Principals of the a �oint venture existmg under the laws of the State of , held on , 2013, the following resolution was duly passed and adopted "RESOLVED, that , as of the Joint Venture, be and is hereby authonzed to execute the CONTRACT dated , 2013, by and befinreen this Jomt Venture and City of Bremerton and that his/her execution thereof, attested by the shall be the official act and deed of this Joint Venture " I further certify that said resolution is now m full force and effect IN WITNESS WHEREOF, I have hereunto set my hand this , day of , 2013 Managing Partner (SEAL) Cily of Bremerton March 2013 Eastsrde Beach Ma:n Replacement CF-6 � ' CONTRACT CERTIFICATE (�f Limited Liability Company) L J STATE OF ' COUNTY OF � � C� � , > ) SS ) I HEREBY CERTIFY that a meeting of the Members of the a Limited Liabdity Company existing under the laws of the State of , held on , 2013, the following resolution was duly passed and adopted "RESOLVED, that , and as members of the Limited Liabdity Company, be and are hereby authorized to execute the CONTRACT dated , 2013, to the City of Bremerton by this Limited Liabdity Company and that their execution thereof shall be the official act and deed of this Limited Liabdity Company " � � � � � ' (SEAL) � � ' I further certify that said resolution is now in full force and effect IN WITNESS WHEREOF, I have hereunto set my hand this , day of , 2013 A Limited Liabdity Company By Member By, Member City of Bremerton March 2013 � Eastszde Beach Marn Replacement CF-7 � I �� THIS PAGE LEFT INTENTIONALLY BLANK � , � � � I� � � C J � �l IJ , ' l.J � , L_ � C:ty of Bremerton March 2013 Eaststde Beach Ma:n Replacement CF-8 � � , , � � � � �j � ' � ' � ' PERFORMANCE BOND (page 1 of 2) KNOW ALL MEN BY THESE PRESENTS, That as CONTRACTOR, and as Surety, are held and firmly bound unto City of Bremerton hereinafter called "OWNER," m the sum of dollars, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, admmistrators, successors, and assigns, �ointly and severally, firmly by these presents THE CONDITIONS OF THIS OBLIGATION ARE SUCH, that said CONTRACTOR has been awarded and is about to enter into the annexed Agreement with said OWNER to perform the WORK as specified or indicated in the Contract Documents entitled "City of Bremerton, Department of Public Works and Utilities, Bremerton, Washington, EASTSIDE BEACH MAIN REPLACEMENT", now, therefore, In the event CONTRACTOR fads to timely or properiy perForm any of the requirements of the Contract Documents at the times and in the manner contained therein, the Surety shall be liable under this bond up to the amount of the bond for the full amount of the OWNERS's expenses to construct or repair all work as well as all loss, cost, expense or damage suffered by the OWNER in excess of the Contract amount due to the CONTRACTOR'S failure to comply with any contract or perm�t conditions or other applicable laws and regulations The Surety agrees that within 30 calendar days of receiving notice that the OWNER has declared a CONTRACTOR default and formally terminated the CONTRACTOR'S right to complete the Contract pursuant to its terms and conditions and that the CONTRACTOR has defaulted on all or part of the terms guaranteed by this bond, the Surety shall either 1 Notify the OWNER m wnting of its intent to cure the default itself withm a reasonable period of time acceptable to the OWNER The OWNER agrees to pay the balance of the Contract pnce to the Surety in accordance with the terms of the Contract, or 2 Tender to the OWNER the demanded sum, up to the amount of the bond However, if the amount necessary for the OWNER to cure the default �s less than the amount tendered, the OWNER will return, without interest, any overpayment to the Surety � PROVIDED, that any alterations in the WORK to be done or the materials to be fumished, or changes in the time of completion, which may be made pursuant to the terms of said Contract Documents, shall not in any way release said CONTRACTOR or said Surety hereunder, nor shall ' any extensions of time granted under the prowsions of said Contract Documents, release either said CONTRACTOR or said Surety, and notice of such alterations or extensions of the Agreement is hereby waived by said Surety , � � The obligation of the Surety shall mclude reimbursmg the City for all costs and expenses, (�nctudmg, but not limited to fees and charges of engmeers, architects, attorneys, and other professionals, and court costs if litigation is commenced) incurred by the OWNER in enforcmg the provisions of this Bond Ciry of Bremerton March 2013 Eastsrde Beach Mam Replacement CF-9 PERFORMANCE BOND (page 2 of 2) The CONTRACTOR hereby agrees that the CONTRACTOR'S obligation to perForm the required work is not limited to the amount of funds held by the Surety This bond is irrevocable and cannot be canceled by the Surety or the CONTRACTOR This bond shall remain in full force and effect for a period of one (1) year foilowing final acceptance of the pro�ect by the City, and untd the bond is released in wntmg by the OWNER at the wntten request of the Surety or CONTRACTOR IN WITNESS WHEREOF, we have hereunder set our hands and seals this day of , 20_ (CONTRACTOR) By By (Signature and SEAL) (Signature and SEAL) (SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETI� _ Address of Surety to which all notices shall be sent Address of Surety for service of process (must be a physical address) C:ty of Bremerton Eaststde Beach Ma:n Replacement (SEAL) (SEAL) (Surety) March 2013 CF-10 LJ � � � ' � � LJ 'J � � , �� PAYMENT BOND (page 1 of 2) KNOW ALL MEN BY THESE PRESENTS, That as CONTRACTOR, and as Surety, are held and firmly bound unto City of Bremerton hereinafter called "OWNER," in the sum of dollars, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, admmistrators, successors, and assigns, �omtly and severally, firmly by these presents THE CONDITIONS OF THIS OBLIGATION ARE SUCH, that said CONTRACTOR has been awarded and is about to enter into the annexed CONTRACT with said OWNER to perform the WORK as specified or mdicated in the Contract Documents entitled "City of Bremerton, Department of Public Works and Utdities, Bremerton, Washington, EASTSIDE BEACH MAIN REPLACEMENT", now, therefore, if said CONTRACTOR, or subcontractor, fads to pay for any materials, equipment, or other supplies, or for rental of same, used in connection with the performance of work contracted to be done, or for amounts due under applicable State law for any work or labor thereon, said Surety wdl pay for the same in an amount not exceeding the sum specified above, and, in the event suit is brought upon this bond, reasonable attorney's fees to be fixed by the court This bond shall inure to the benefit of any persons, comparnes, or corporations entitled to file claims under applicable State law so as to give a right of action to them or their assigns in any suit brought upon this bond PROVIDED, that any alterations in the WORK to be done or the materials to be fumished, or ' changes in the time of completion, which may be made pursuant to the terms of said Contract Documents, shall not in any way release said CONTRACTOR or said Surety thereunder, nor shall any extensions of time granted under the provisions of said Contract Documents release either � said CONTRACTOR or said Surety, and notice of such alterations or extensions of the CONTRACT is hereby waived by said Surety , , L_J , ' The obligation of the Surety shall include reimbursing the City of all costs and expenses, (including, but not limited to fee and charges of engineers, architects, attorneys, and other professionals, and court costs if litigation is commenced) incurred by the OWNER in enforcing the prowsions of this Bond Crty of Bremerton March 20/3 � Easts:de Beach Ma:n Replacemettt CF-11 PAYMENT BOND (page 2 of 2) IN WITNESS WHEREOF, we have hereunder set our hands and seals this day of , 2013 (CONTRACTOR) (Surety) g By (Signature and SEAL) (Signature and SEAL) (SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETI� Address of Surety to which all notices shall be sent Address of Surety for service of process (must be a physical address) END OF CON7RACT FORMS Crry of Bremerton Eastside Beach Marn RepJacement March 2013 CF-12 � � ' LJ � PART II , WSDOT AMENDMENTS TO THE STANDARD SPECIFICATIONS � �� ' � � � L 1 1 i 1 1 1 1 � � � � THIS PAGE LEFT INTENTIONALLY BLANK � , i,� � � � O � ' , ' � ' LJ � �J L_ J � CI � ' , , � � �l � ,� ' ' � , , ' ' , 1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 INTRO AP1 INTRODUCTION The following Amendments and Special Provisions shall be used in con�unction with the 2012 Standard Specifications for Road, Bridge, and Municipal Construction _ AMENDMENTS TO THE STANDARD SPECIFICATIONS The following Amendments to the Standard Specifications are made a part of this contract and supersede any conflicting provisions of the Standard Specifications For mformational purposes, the date following each Amendment title indicates the implementation date of the Amendment or the latest date of revision Each Amendment contains all current revisions to the applicable section of the Standard Specifications and may inciude references which do not apply to this particular pro�ect 1-01 AP1 Section 1-01, Definition and Terms August 6, 2012 1 Definitions The definition for "B�d Documents" is revised to read The component parts of the proposed Contract which may include, but are not limited to, the Proposal Form, the proposed Contract Provisions, the proposed Contract Plans, Addenda, and, for pro�ects with Contracting Agency subsurFace investigations, the Summary of Geotechrncal Conditions and subsurface bormg logs (if any) The definition for "Superstructures" is revised to read The part of the Structure above 2 3 The bottom of the grout pad for the simple and continuous span bearing, or The bottom of the block supporting the girder, or Arch skewback and construction �oints at the top of vertical abutment members or rigid frame piers Longitudmal limits of the Superstructure extend from end to end of the Structure in accordance with the followmg criteria From the face of end diaphragm abutting the bridge approach embankment for end piers without expansion �oints, or 2 From the end pier expansion �oint for bridges with end pier expansion �oints Superstructures include, but are not limited to, the bottom slab and webs of box girders, the bndge deck and diaphragms of all bridges, and the sidewalks when shown on the bridge deck The Superstructure also includes the girders, expansion �oints, bearings, barrier, and railmg attached to the Superstructure when such Superstructure AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 7 C� 1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 components are not otherwise covered by separate unit measured or lump sum bid items Superstructures do not mclude endwalls, wingwalls, barrier and railmg attached to the wmgwalls, and cantdever barriers and radings unless supported by the Superstructure 1-02 AP1 Section 1-02, Bid Procedures and Conditions January 2, 2012 1-02.4(2) Subsurface Information The first finro sentences in the first paragraph are revised to read If the Contracting Agency has made subsurface investigation of the site of the proposed work, the boring log data, sod sample test data, and geotechnical recommendations reports obtained by the Contracting Agency wdl be made avadable for inspection by the Bidders at the location specified in the Special Provisions The Summary of Geotechnical Conditions, as an appendix to the Special Provisions, and the boring logs shall be considered as part of the Contract 1-03 AP1 Section 1-03, Award and Execution of Contract April 2, 2012 1-03.1(1) Tied Bids This section's title is revised to read 1-03.1(1) Iden4ical Bid Totals 1-05 AP1 Section 1-05, Control of Work August 6, 2012 1-05.13(1) Emergency Contact List The second sentence in the first paragraph is revised to read The list shall include, at a minimum, the Pnme Contractor's Pro�ect Manager, or equivalent, the Prime Contractor's Pro�ect Supermtendent, the Erosion and Sediment Control (ESC) Lead and the Traffic Control Supervisor 1-06 AP1 Section 1-06, Control of Material January 7, 2013 1-06.1(4) Fabrication Inspection Expense The first paragraph is revised to read In the event the Contractor elects to have items fabricated beyond 300 mdes from Seattle, Washington, the Contracting Agency wdl deduct from payment due the Contractor costs to perForm fabrication inspection on the following items AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 7/7/2013 Page 2 ' � ' ' ' � � I r-, L � � a ' , �J ' ' ' �� LJ ' � ' � � , � ' � � � � � � , �_J , ' IJ 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 • Bridge Beanngs (Cylindrical, Disc, Fabric Pad, Pm, Pendulum, Rocker, and Spherical) • Cantilever Sign Structures and Sign Bridges • Epoxy-Coated Reinforcing Steel • Metal Bridge Rading and Handrail • Modular Expansion Jomts • Pamted Pilmg and Casing • Painted and Powder-Coated Luminaire and Signal Poles • Precast Concrete Catch Basins, Manholes, Inlets, Drywells, and Risers • Precast Concrete Dram, Perforated Underdram, Culvert, Storm Sewer, and Sanitary Sewer Pipe • Precast Concrete Three Sided Structures • Precast Concrete Junction Boxes, Pull Boxes, Cable Vaults, Utdity Vaults, and Box Culverts • Precast Concrete Traffic Barrier • Precast Concrete Marine Pier Deck Panels • Precast Concrete Floor Panels • Precast Concrete Structural Earth Walls, Noise Barrier Walls, and Wall Stem Panels • Precast Concrete Retainmg Walls, including Lagging Panels • Prestressed Concrete Girders and Precast Bridge Components • Prestressed Concrete Pdes • Seismic Retrofit Earthquake Restrainers • Soldier Pdes • Steel Bridges and Steel Bridge Components • Steel Column Jackets • Structural Steel for Ferry Terminals, including items such as Dolphins, Wingwalls, and Transfer Spans • Treated Timber and Lumber 6-inch by 6-mch or larger • Timber • Additional items as may be determined by the Engmeer The footnote below the table is revised to read An inspection day includes any calendar day or portion of a calendar day spent by one inspector inspecting, on standby, or travelmg to and from a place of fabrication An additional cost per inspection day will be assessed for each additional inspector Reimbursement will be assessed at $280 00 per day for weekends and holidays for each on site inspector in travel status, but not engaged in inspection or travel activities when fabrication activities are not taking place 1-07 AP1 Section 1-07, Legal Relations and Responsibilities to the Public January 7, 2013 1-07.1 Laws to be Observed The following finro sentences are inserted after the first sentence in the third paragraph In particular the Contractor's attention is drawn to the requirements of WAC 296 800 which requires employers to provide a safe workplace More specifically WAC 296 800 11025 prohibits alcohol and narcotics from the workplace AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 7/7/2013 Page 3 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 1 Posting Notices This section is revised to read Notices and posters shall be placed m areas readdy accessible to read by employees The Contractor shall ensure the following are posted EEOC - P/E-1 (revised 11/09) - Equal Employment Opporturnty is THE LAW published by US Department of Labor Post for pro�ects with federal-aid funding 2 FHWA 1022 (revised 11/11) - NOTICE Federal-Aid Pro�ect published by Federal Highway Administration (FHWA) Post for pro�ects with federal-aid funding 3 WH 1321 (revised 04/09) - Employee Rights under the Davis-Bacon Act published by US Department of Labor Post for pro�ects with federal-aid fundmg � � ' ' LJ ' ' 4 WHD 1088 (revised 07/09) - Employee Rights under the Fair Labor Standards ' Act published by US Department of Labor Post on all pro�ects 5 WHD - 1420 (revised 01/09) - Employee Rights and Responsibdities under The , Famdy and Medical Leave Act published by US Department Of Labor Post on all pro�ects a � 7 � WHD-1462 (revised 01/12) — Employee Polygraph Protection Act published by US Department of Labor Post on all pro�ects F416-081-909 (revised 12/12) - Job Safety and Health Law published by Washmgton State Department of Labor and Industries Post on all pro�ects F242-191-909 (revised 12/12) - Notice to Employees published by Washington State Department of Labor and Industnes Post on all pro�ects 9 F700-074-909 (revised 12/12) - Your Rights as a Worker in Washington State by Washington State Department of Labor and industr�es (L&I) Post on all pro�ects 10 EMS 9874 (revised 04/12) - Unemployment Benefits published by Washington State Employee Security Department Post on all pro�ects 11 Post one copy of the approved "Statement of Intent to Pay Prevading Wages" for the Contractor, each Subcontractor, each lower tier subcontractor, and any other firm (Supplier, Manufacturer, or Fabricator) that falls under the provisions of RCW 39 12 because of the definition of "Contractor" m WAC 296-127-010 12 Post one copy of the prevading wage rates for the pro�ect 1 Responsibility for Damage The fifth paragraph is revised to read II ,� � � , , ' � � � �J AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 4 ' ' � , ' ' ' LJ� ' t LJ ' L_�I , � '�J � 1 ' ' � 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Pursuant to RCW 4 24 115, if such claims, suits, or actions result from the concurrent negligence of (a) the indemnitee or the indemnitee's agents or employees and (b) the Contractor or the Contractor's agent or employees, the mdemnity provisions provided in the preceding paragraphs of this Section shall be valid and enforceable only to the extent of the Contractor's negligence or the negligence of its agents and employees 1-07.15 Temporary Water Pollution/Erosion Control The third paragraph is deleted 1-08 AP1 Section 1-08, Prosecution and Progress April 2, 2012 1-08.1 Subcontracting In the eighth paragraph, "Contracting Agency" is revised to read "WSDOT" 1-08.3(1) General Requirements The following new paragraph is mserted after the first paragraph Total float belongs to the pro�ect and shall not be for the exclusive benefit of any party 1-08.7 Maintenance During Suspension The second paragraph is revised to read At no expense to the Contracting Agency, the Contractor shall provide through the construction area safe, smooth, and unobstructed roadways and pedestrian access routes for public use durmg the suspension (as required in Section 1-07 23 or the Special Provisions ) This may include a temporary road, alternative pedestnan access route or detour ' 1-09 AP1 Section 1-09, Measurement and Payment August 6, 2012 1-09.1 Measurement of Quantities The followmg new sentence is inserted after the sentence ""Ton" 2,000 pounds of avoirdupois weight" Items of payment that have "Lump Sum" or "Force Account" in the Bid Item of Work shall have no specific urnt of ineasurement requirement 1 Measurement The second sentence in the first paragraph is revised to read The frequency of verification checks will be such that at least one test weekly is perFormed for each scale used m weighing contract items of Work AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 5 � 1 3-04 AP3 2 Section 3-04, Acceptance of Aggregate 3 April 2, 2012 4 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 3 An Entire Lot The last sentence is deleted 3-04.5 Payment In the second paragraph, the reference "Section 3-04 3(6)C " is revised to read "Section 3- 04 3(8)" In Table 1, the row containing the item "Gravel Borrow for Geosynthetic Retairnng Wall" is revised to read 9-03 14(4) I Gravel Borrow for Geosynthetic I 4000 I 2000 Retairune Wall 5-01 AP5 Section 5-01, Cement Concrete Pavement Rehabilitation April 2, 2012 5-01.3(2)B Portland Cement Concrete The fifth sentence in the third paragraph is revised to read � , , � $30 $60 ' The lower Specification limit for compressive strength shall be 4,000-psi The last finro sentences in the third paragraph are deleted 5-01.3(11) Concrete Slurry This section including title is revised to read 5 Concrete Slurry and Grinding Residue All concrete slurry and grinding residue shall be removed from the pavement surface on a continual basis immediately behind the gnnding or cutting operations Slurry shall not be allowed to drain into an area open to traffic, off of the paved surface or into any dramage structure The Contractor shall collect the concrete slurry and grindmg residue from the pavement surface and dispose of it m accordance with Section 2-03 3(7)C Opening to tra�c shall meet the requirements of Section 5-05 3(17) 5-02 AP5 Section 5-02, Bituminous Surface Treatment August 6, 2012 5-02.2 Materials The following new paragraph is inserted after the second paragraph AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 6 � � LJ � a t I � J ' , ' ' ' � � , ' �J 1 , ' , ' ' ' ' � � LJ � �, ,� ' 1 1 2 4 5 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 Each source of aggregate for bituminous surface treatment shall be evaluated separately for acceptance m accordance with Section 3-04 5-04 AP5 Section 5-04, Hot Mix Asphalt January 7, 2013 5-04.2 Materials The fourth paragraph is revised to read The grade of asphalt binder shall be as required by the Contract Blending of asphalt binder from different sources is not permitted 5-04.3(7)A1 General This section is supplemented with the following The Contractor shall include the brand and type of anti-stripping additive in the mix design submittal and provide certification from the asphalt binder manufacture that the anti-stripping additive is compatible with the crude source and formulation of asphalt binder proposed in mix design 5 Commercial Evaluation The second sentence in the second paragraph is deleted 5 Longitudinal Joint Density The section including title is revised to read 5-04.3(10)B3 Vacant 5-04.3(11)D General The last sentence in the first paragraph is deleted 5-04.3(20) Anti Additive This section is revised to read Anti-stripping additive shall be added to the liquid asphalt by the asphalt supplier prior to shipment to the asphalt mixing plant For HMA accepted by statistical and nonstatistical evaluation the anti-stripping additive shall be added in the amount designated in the WSDOT mix design/anti-strip evaluation report provided by the Contracting Agency For HMA accepted by commercial evaluation the Pro�ect Engineer wdl determine the amount of anti-strip to be added, pavmg shall not begin before the anti-strip requirements have been provided to the Contractor 5 Measurement The last paragraph is deleted 5-04.5 Payment The bid item "Longitudmal Joint Density Price AdJustment", by calculation and paragraph following bid item are deleted AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 7 ' 1 6-02 AP6 2 Section 6-02, Concrete Structures 3 January 7, 2013 4 5 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 6-02.3(2) Proportioning Materials The Lean Concrete value in the column "Minimum Cemetitious Content (pounds)" m the table titled "Cementitious Requirement for Concrete" is revised to read ****145 The following new note is inserted after the note ""** No maximum specified" in the table titled "Cementitious Requirement for Concrete" *"**Maximum of 200 pounds The paragraph following the table "Cementitious Requirements for Concrete" is revised to read When both ground granulated blast furnace slag and fly ash are included in the concrete mix, the total weight of both these materials is limited to 40 percent by weight of the total cementitious material for concrete Class 4000D and 4000A, and 50 percent by weight of the total cementitious material for all other classes of concrete 6-02.3(2)B Commercial Concrete The second paragraph is revised to read Where concrete Class 3000 is specified for items such as, culvert headwalls, plugging culverts, concrete pipe collars, pipe anchors, monument cases, Type PPB, PS, I, FB and RM signal standards, pedestals, cabinet bases, guardrad anchors, fence post footings, sidewalks, curbs, and gutters, the Contractor may use commercial concrete If commercial concrete is used for sidewalks, curbs, and gutters, it shall have a minimum cementitious material content of 564 pounds per cubic yard of concrete, shall be air entramed, and the tolerances of Section 6-02 3(5)C shall apply 6-02.3(2)D Lean Concrete This section is revised to read Lean concrete shall meet the cementitious requirements of Section 6-02 3(2) and have a maximum wateNcement ratio of 2 6-02.3(4)A Qualification of Concrete Suppliers The first paragraph is revised to read Batch Plant Prequalification requires a certification by the National Ready Mix Concrete Association (NRMCA) Information concerning NRMCA certification may be obtained from the NRMCA at 900 Sprmg Street, Silver Springs, MD 20910 or onlme at www nrmca org The NRMCA cert�fication shall be valid for a 2-year period from the date of certificate The followmg documentation shall be submitted to the Pro�ect Engineer, a copy of the current NRMCA Certificate of Conformance, the concrete mix design(s) (WSDOT Form 350-040), along with copies of the truck list, batch plant scale certification, admixture dispensing certification, and volumetric water batching devices (including water meters) verification AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rewsed 1/7/2013 Page 8 L�I I �� � , � ' � ^ � -;1 � � � I �� � � � � �J ' , � ' � � ' I � J , , ' ' ' �� ' � ' ' ' , , ' ' 1 2 3 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 6-02.3(5)G Sampling and Testing Frequency for Temperature, Consistency, and Air Control The last sentence m the second paragraph is revised to read Samplmg shall be performed in accordance with WSDOT FOP for WAQTC TM 2 and random samples shall be selected in accordance with WSDOT TM 716 6 Pigmented Sealer for Concrete SurFaces This section is revised to read The Contractor shall submit the pigmented sealer manufacturer's written instructions covering, at a minimum, the following Surface preparation 2 3 4 5 Application methods Requirements for concrete curing prior to sealer application Temperature, humidity and precipitation limitations for application Rate of application and number of coats to apply The Contractor shall not begin applying pigmented sealer to the surfaces specified to receive the sealer until receiving the Engineer's approval of the submittal All surfaces specified in the Plans to receive pigmented sealer shall receive a Class 2�� surface firnsh (except that concrete barrier surfaces shall be firnshed m accordance with{� Section 6-02 3(11)A) The Contractor shall not apply pigmented sealer from a batch greater than 12 months past the irntial date of color sample approval of that batch by the Engineer The pigmented sealer color or colors for specific concrete surfaces shall be as specified in the Special Provisions The final appearance shall be even and uniform without blotchmess, streaking or uneven color Surface firnshes deemed unacceptable by the Engmeer shall be re- coated in accordance with the manufacturer's recommendations at no additional expense to the Contracting Agency For concrete surfaces such as columns, retaming walls, pier walls, abutments, concrete fascia panels, and noise barrier wall panels, the pigmented sealer shall extend to 1 foot below the finish ground Ime, unless otherwise shown in the Plans 6 Plans for Falsework and Formwork Item No 4 in the seventh paragraph is revised to read 4 Conditions required by other Sections of 6-02 3(17), Falsework and Formwork Item's No 5, 6, 7, and 8 m the seventh paragraph are deleted AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1l7/2073 Page 9 ' 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 The followmg paragraph is mserted after the seventh paragraph Plan approval can be done by the Pro�ect Engmeer for footings and walls 4 to 8 feet high (excluding pedestal height) provided Concrete placement rate is 4 feet per hour or less 2 3 4 Facing is �/-inch plywood with grades as specified per Section 6-02 3(17)I Studs, with plywood face grain perpendicular, are 2 by 4's spaced at 12 inches Walers with 3,000 pound safe working load ties spaced at 24 inches are finro 2 by 4's spaced at 24 inches 6-02.3(17)F Bracing in the first paragraph, the phrase "per Section 6-02 3(17)I" is revised to read "in accordance with Section 6-02 3(17)I" This section is supplemented with the following new sub-section 6-02.3(17)F5 Temporary Bracing for Bridge Girders During Diaphragm and Bridge Deck Concrete Placement Prestressed concrete girders shall be braced to resist forces that would cause rotation or torsion in the girders caused by the placing of precast concrete deck panels and concrete for the bridge deck Bracing shall be designed and detaded by the Contractor and shall be shown in the falsework/formwork plans submitted to the Engineer for approval These braces shall be furnished, installed, and removed by the Contractor at no additional cost to the Contracting Agency The Contractor may consider the bracing effects of the diaphragms in developing the falsework/formwork plans The Contractor shall account for the added load from concrete firnshing machines and other construction loadmgs in the design of the bracmg Falsework support brackets and braces shall not be welded to structural steel bridge members or to steel reinforcing bars 6-02.3(17)F4 Temporary Bracing for Bridge Girders This section includmg title is revised to read 6-02.3(17)F4 Temporary Bracing for Bridge Girders During Erection Steel girders shall be braced m accordance with Section 6-03 3(7)A Prestressed concrete girders shall be braced sequentially durmg girder erection The bracmg shall be designed and detaded by the Contractor and shall be shown in the falsework/formwork plans submitted to the Engineer for approval The Contractor shall furnish, install, and remove the bracing at no additional cost to the Contractmg Agency At a minimum, the Contractor shall brace girders at each end and at midspan to prevent lateral movement or rotation This bracmg shall be placed prior to the release of each girder from the erection equipment If the bridge is constructed with cast-m-place AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rewsed 1/7/2013 , ' , ' ' ' � � � �� � � � , ' � ' ' Page 10 ' ' ' � L�� ' ' ' � ' ' , ' ' ' L� 1 1 ! _� ' 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 concrete diaphragms, the bracing may be removed once the concrete in the diaphragms has been placed and cured for a minimum of 24 hours 6-02.3(17)H Formwork Accesories The first paragraph is deleted and replaced with the followmg finro new paragraphs Formwork accessones such as form ties, form anchors, form hangers, anchoring inserts, and similar hardware shall be specifically identified m the formwork plans including the name and size of the hardware, manufacturer, safe working load, and factor of safety The grade of steel shall also be indicated for threaded rods, cod rods, and similar hardware Wire form t�es shall not be used Welding or clamping formwork accessories to Contract Plan reinforcing steel will not be allowed Driven types of anchorages for fastening forms or form supports to concrete, and Contractor fabricated "J" hooks shall not be used Field drdling of holes m prestressed girders is not allowed Taper ties may be used provided the following conditions are met The structure is not designed to resist water pressure (pontoons, floating dolphins, detention vaults, etc ) 2 After the taper tie is removed, plugs designed and intended for plugging taper tie holes shall be installed at each face of concrete The plug shall be installed a miromum of 1%z" clear from the face of concrete 3 4 After the plug is installed, the hole shall be cleaned of all grease, contamination and foreign matter Holes on the exposed faces of concrete shall be patched and finished to match r the surrounding concrete , 6-02.3(25)N Prestressed Concrete Girder Erection The third sentence in the fifth paragraph is revised to read The girders shall be braced in accordance with Sections 6-02 3(17)F4 and 6- 02 3(17)F5 6-02.3(26)E5 Leak Tightness Testing The first sentence in the first paragraph is revised to read The Contractor shall test each completed duct assembly for leak tightness after placmg concrete but prior to plaang post tensiornng reinforcement The second paragraph is revised to read Prior to testmg, all grout caps shall be installed and all vents, grout in�ection ports, and drains shall either be capped or have their shut-off valves closed The Contractor shall pressurize the completed duct assembly to an initial air pressure of 50 psi This pressure shall be held for five minutes to allow for internal ad�ustments within the assembly After five minutes, the air supply valve shall be closed The Contractor shall monitor and measure the pressure maintained within the closed assembly, and any subsequent loss of pressure, over a period of one minute following the closure of the air supply valve The maximum pressure loss for duct assemblies equal to or less than AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 7/7/2013 Page 11 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 150 feet in length shall be 25 psig The maximum pressure loss for duct assemblies greater than 150 feet m length shall be 15 psig If the pressure loss exceeds the allowable, locations of leakage shall be identified, repaired or reconstructed using methods approved by the Engineer The repaired system shall then be retested The cycle of testing, repair and retest�ng of each completed duct assembly shall continue until the completed duct assembly completes a test with pressure loss within the specified amount 6-03 AP6 Section 6-03, Steel Structures April 2, 2012 6-03.3(28)A Method of Shop Assembly The first sentence in Item 2 C is revised to read For Trusses and Girders — After the first stage has been completed, each subsequent stage shall be assembled to include at least one truss panel or girder shop sect�on of the previous stage and two or more truss panels or girder shop sections added at the advancing end 6-05 AP6 Section 6-05, Piling August 6, 2012 6-05.5 Payment The paragraph following the bid item, "Driwng St Pde", per each is revised to read The unit Contract price per each for "Drivmg (type) Pile (�H shall be full pay for drivmg the pde to the ultimate beanng and/or penetration specified 6-06 AP6 Section 6-06, Bridge Railings August 6, 2012 6-06.3(2) Metal Railings The third paragraph is revised to read Anchor bolts shall be positioned with a template to ensure that bolts match the hole spacing of the bottom channels or anchorage plates 6-07 AP6 Section 6-07, Painting April 2, 2012 6-07.3(9)A Paint System The first sentence in the second paragraph is revised to read All pamt coating components of the selected paint system shall be produced by the same manufacturer AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rewsed 1/7/2013 ' 1 1 � 1 ' 1 LJ � , � 1 1 ' � 1 , � Page 12 1 � � � � � � � , � � � � � � �J � � � � 3 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 6 Paint System The f�rst and second sentences in the second paragraph are revised to read All paint coating components of the selected paint system shall be produced by the same manufacturer 6-10 AP6 Section 6-10, Concrete Barrier August 6, 2012 6-10.3 Construction Requirements This section is supplemented with the following Steel welded wire reinforcement deformed, conforming to Section 9-07 7, may be substituted in concrete barrier in place of deformed steel bars conforming to Section 9- 07 2, sub�ect to the followmg conditions Steel welded wire remforcement spacing shall be the same as the deformed steel bar spacmg as shown in the Standard Plans 2 The minimum cross sectional area for steel welded wire reinforcement shall be no less than 86 percent of the cross sectional area for the deformed steel bars bemg substituted 3 Development lengths and splice lengths shall conform to requirements specified m the AASHTO LRFD Bridge Design Specifications, current edition � 6-10.5 Payment In the second paragraph, the bid item "Conc Class 4000" is revised to read "Conc Class 4000_" 6-12 AP6 Section 6-12, Noise Barrier Walls August 6, 2012 6-12.3(3) Shaft Construction The third sentence in the fifth paragraph is revised to read When efforts to advance past the obstruction to the design shaft tip elevation result in the rate of advance of the shaft drilling equipment bemg significantly reduced relative to the rate of advance for the rest of the shaft excavation, then the Contractor shall remove the obstruction under the provisions of Section 6-12 5 6 Precast Concrete Panel Fabrication and Erection The second sentence in item number 3 is deleted 6 Payment Th�s section is supplemented with the following AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 "Removing Noise Barrier Wall Shaft Obstructions", estimated Payment for removing obstructions, as defined in Section 6-12 3(3), wdl be made for the changes m shaft construction methods necessary to remove the obstruction The Contractor and the Engineer shail evaluate the effort made and reach agreement on the equipment and employees utdized, and the number of hours involved for each Once these cost items and their duration have been agreed upon, the payment amount wdl be determined using the rate and markup methods specified m Section 1-09 6 For the purpose of providing a common proposal for all bidders, the Contracting Agency has entered an amount for the item "Removing Noise Barrier Wall Shaft Obstructions" m the bid proposal to become a part of the total bid by the Contractor If the shaft construction equipment is idled as a result of the obstruction removal work and cannot be reasonably reassigned withm the proJect, then standby payment for the idled equipment wdl be added to the payment calculations If labor is idled as a result of the obstruction removal work and cannot be reasonably reassigned within the pro�ect, then all labor costs resulting from Contractor labor agreements and established Contractor polic�es will be added to the payment calculations The Contractor shall perform the amount of obstruction work estimated by the Contractmg Agency within the original time of the contract The Engmeer wdl consider a time ad�ustment and additional compensation for costs related to the extended duration of the shaft construction operations, provided the dollar amount estimated by the Contracting Agency has been exceeded, and, 2 the Contractor shows that the obstruction removal work represents a delay to the completion of the pro�ect based on the current progress schedule provided in accordance with Section 1-08 3 6-14 AP6 Section 6-14, Geosynthetic Retaining Walls January 2, 2012 6-14.2 lVlaterials The referenced section for the following item is revised to read Grout 9-20 3(4) In the first paragraph, the following items are inserted after the item "Gravel Borrow For � Geosynthetic Retaining Wall" Polyurethane Sealant 9-04 2(3) Closed Cell Foam Backer Rod 9-04 2(3)A 6-15 AP6 Section 6-15, Soil Nail Walls January 2, 2012 6-15.2 Materials The referenced section for the following �tem is revised to read AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2073 Page 14 � � �� � I� � �` � � �,I ��� � ��� � � � � LJ �� � � � � � � � � � 1 2 4 5 7 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 Grout 9-20 3(4) 6 Submittals Item f beneath item number 3 is revised to read Mix design and procedures for placing the grout 6 Soil Nailing This section is supplemented with the following The Contractor shall make and cure grout cubes once per day m accordance with WSDOT Test Method T 813 These samples shall be retained by the Contractor untd all associated verification and proof testmg of the soil nails has been successfully completed if the Contractor elects to test the grout cubes for compressive strength, testmg shall be conducted by an independent laboratory and shall be in accordance with the WSDOT FOP for AASHTO T106 6-16 AP6 Section 6-16, Soldier Pile and Soldier Pile Tieback Walls January 2, 2012 6-16.3(3) Shaft Excavation The third sentence in the seventh paragraph is revised to read When efforts to advance past the obstruction to the design shaft tip elevation result in the rate of advance of the shaft drilling equipment bemg sigrnficantly reduced relative to the rate of advance for the rest of the shaft excavation, then the Contractor shall remove', the obstruction under the provisions of Section 6-16 5 6 Payment This section is supplemented with the followmg "Removmg Soldier Pde Shaft Obstructions", estimated Payment for removing obstructions, as defined in Section 6-16 3(3), will be made for the changes in shaft construction methods necessary to remove the obstruction The Contractor and the Engineer shall evaluate the effort made and reach agreement on the equipment and employees utdized, and the number of hours involved for each Once these cost items and their duration have been agreed upon, the payment amount will be determmed using the rate and markup methods specified in Section 1-09 6 For the purpose of providmg a common proposal for all bidders, the Contracting Agency has entered an amount for the item "Removing Soldier Pde Shaft Obstructions" in the bid proposal to become a part of the total bid by the Contractor If the shaft construction equipment is idled as a result of the obstruction removal work and cannot be reasonably reassigned within the pro�ect, then standby payment for the idled equipment wdl be added to the payment calculations If labor is idled as a result of the obstruction removal work and cannot be reasonably reassigned within the pro�ect, then all labor costs resulting from Contractor labor agreements and established Contractor policies will be added to the payment calculations AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 15 � 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 The Contractor shall perform the amount of obstruction work estimated by the Contracting Agency within the origmal time of the contract The Engineer wdl consider a time ad�ustment and additional compensation for costs related to the extended duration �; of the shaft construction operations, provided the dollar amount estimated by the Contracting Agency has been exceeded, and, 2 the Contractor shows that the obstruction removal work represents a delay to the completion of the pro�ect based on the current progress schedule provided in accordance with Section 1-08 3 6-17 AP6 Section 6-17, Permanent Ground Anchors August 6, 2012 6-17.3(3) Submittals The first sentence m the sixth paragraph is revised to read The Contractor shall submit the mix design for the grout conforming to Section 9-20 3(4) and the procedures for placing the grout to the Engineer for approval 6-17.3(7) Installing Permanent Ground Anchors The following new paragraph is inserted after the sixth paragraph The Contractor shall make and cure grout cubes once per day m accordance with WSDOT Test Method T 813 These samples shall be retained by the Contractor until all associated verification, performance and proof testmg of the permanent ground anchors has been successfully completed if the Contractor elects to test the grout cubes for compressive strength, testing shall be conducted by an independent laboratory and shall be in accordance with the WSDOT FOP for AASHTO T106 6 Permanent Ground Anchor Acceptance Criteria The fourth paragraph is deleted 6-19 AP6 Section 6-19, Shafts August 6, 2012 6-19.3(4)F Slurry Disposal This section including title is revised to read 6 Disposal of Slurry and Slurry Contacted Spoils The Contractor shall dispose of the slurry and slurry-contacted spods as specified in the � shaft installation narrative in accordance with Section 6-19 3(2)B, item 8, and in accordance with the following requirements Water slurry with no additives may be infiltrated to an upland area within the confines of the Contractmg Agency Right of Way for the pro�ect Infdtration is allowed provided the ground-line at the disposal site is at least 5 feet above the current water table, and that disposal operations conform to the temporary AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 76 �! � �� � � � � � ,� � �� � � � � � ,� � � ,� � � � 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 erosion and sedimentation control (TESC) requirements established for this pro�ect For the purposes of water slurry disposal, upland is defined as an area that has no chance of discharging directly to waters of the State, includmg wetlands or conveyances that indirectly lead to wetlands or waters of the State Spods in contact with this slurry may be disposed of as clean fdl 2 Synthetic slurry and water slurry with polymer-based additives shall be contained and disposed of by the Contractor at an approved facility The Contractor shall acqwre all permits or approvals necessary for disposal of the slurry and shall provide copies to the Engineer Spoils in contact with synthetic slurry or water slurry with polymer-based additives shall be disposed of in accordance with Section 2-03 3(7)C With approval of the Engineer, the Contractor may re-use these spoils on-site 3 Mineral slurry may be infiltrated to a temporary sediment trap located in an upland area within the confines of the Contracting Agency Right of Way for the pro�ect Infiltration is allowed provided the ground-line at the disposal site is at least 5 feet above the current water table, and that disposal operations conform to the temporary erosion and sedimentation control (TESC) requirements established for this pro�ect For the purposes of mineral slurry disposal, upland is defined as an area that has no chance of discharging directly to waters of the State, mcluding wetlands or conveyances that indirectly lead to wetlands or waters of the State Spoils in contact with mineral slurry shall be disposed of in accordance with Section 2-03 3(7)C With approval of the Engmeer, the Contractor may re-use these spods on-site 7-02 AP7 Section 7-02, Culverts August 6, 2012 7-02.2 Materials Note 3 in the table titled, "Culvert Pipe Schedules" is revised to read 3 Polypropylene pipe, 12 inch to 30 inch diameters approved for Schedule A and Schedule B, 36 inch to 60 mch diameters approved for Schedule A only 38 7-02.5 39 The bid item "Steel Rib Reinforced Polyethylene Culvert Pipe In Diam ", per linear 40 foot is revised to read 41 42 "St Rib Reinf Polyethylene Culv Pipe In Diam ", per linear foot 43 44 7-03 AP7 45 Section 7-03, Structural Plate Pipe, Pipe Arch, Arch, and Underpass 46 August 6, 2012 47 7-03.3(1) Foundations, General 48 This section is supplemented with the follow�ng 49 AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rewsed 7/7/2073 Page 17 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 When alummum pipe or pipe arch is in contact with cement concrete, finro coats of paint shall be applied in accordance with Section 7-08 3(2)D 7 Headwalls This section is supplemented with the following When aluminum pipe or pipe arch is in contact with cement concrete, two coats of pamt shall be applied in accordance with Section 7-08 3(2)D � 7-04 AP7 Section 7-04, Storm Sewers August 6, 2012 7-04.3(1)B Exfiltration Test — Storm Sewers The fifth column title "PE is revised to read "PP from the table titled, "Storm Sewer Pipe Schedules" Note 4 in the table titled, "Storm Sewer Pipe Schedules" is revised to read 4 PP = Polypropylene Pipe, 12 inch to 30 mch approved for Schedule A and Schedule B, 36 inch to 60 inch diameters approved for Schedule A only 7-04.5 The bid item "Steel Rib Reinforced Polyethylene Storm Sewer P�pe In Diam", per linear foot is revised to read "St Rib Reinf Polyethylene Storm Sewer Pipe In Diam", per Imear foot 7-05 AP7 Section 7-05, Manholes, Inlets, Catch Basins, and Dryvvells April 2, 2012 7 Construction Requirements The third paragraph is supplemented with the following Levelmg and ad�ustment devices that do not mod�y the structural integrity of the metal frame, grate or cover, and do not void the originating foundry's compliance to these specifications and warranty is allowed Approved leveling devices are listed in the Qualified Products List Leveling and ad�usting devices that interfere with the backfilling, backfdl density, grouting and asphalt density wdl not be allowed The hardware for levelmg and ad�usting devices shall be completely removed when specified by the Pro�ect Engineer 7-08 AP7 Section 7-08, General Pipe Installation Requirements August 6, 2012 7-08.3(2)D Pipe Laying — Steel or Aluminum The followmg new sentence is inserted after the first sentence in the second paragraph AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rewsed 1/7/2013 Page 18 �� � � � �' �� � � � �� � � � �� LJ ,�5 � � � 1 2 4 5 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 The paint shall cover all the surface in contact with the concrete and extend one inch beyond the point of contact 7-09 AP7 Section 7-09, Water Mains August 6, 2012 7-09.3(19)A Connections to Existing Mains In the second paragraph, "Special Conditions" is revised to read "Special Provisions" 8-01 AP8 Section 8-01, Erosion Control and Water Pollution Control January 7, 2013 8-01.2 Materials The first paragraph is revised to read Materials shall meet the requirements of the following sections Corrugated Polyethylene Drain Pipe Quarry Spalls Seed Fertilizer Mulch and Amendments Tackifiers Erosion Control Dewces High vsibdity Fence Construction Geotextde 9-05 1(6) 9-13 9-14 2 9-14 3 9-14 4 9-14 4(7) 9-14 5 9-14 5 9-33 8 Mulching The following two new paragraphs are inserted after the fourth paragraph Short-Term Mulch shall be hydraulically applied at the rate of 2500 pounds per acre and may be applied in one lift Moderate-Term Mulch and Long-Term Mulch shall be hydraulically applied at the rate of 3500 pounds per acre with no more than 2000 pounds applied in any smgle lift 8 Soil Binders and Tacking Agents This section including title is revised to read 8 Tackifiers Tackifiers applied using a hydroseeder shall have a muich tracer added to visibly aid uniform application This tracer shall not be harmful to plant, aquatic, or animal life A minimum of 125 pounds per acre and a maximum of 250 pounds per acre of Short- Term Mulch shall be used as a tracer Tackifier shall be mixed and applied in accordance with the manufacturer's recommendations Soil Binding Using Polyacrylamide (PAM) — The PAM shall be applied on bare soil completely dissolved and mixed in water or applied as a dry powder Dissolved PAM shall be applied at a rate of not more than 2 / pound per 1,000 gallons of water per acre AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rewsed 1/7/2013 Page 19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 A minimum of 200 pounds per acre of Short-Term Mulch shall be applied with the dissolved PAM Dry powder applications may be at a rate of 5 pounds per acre using a hand-held fertdizer spreader or a tractor-mounted spreader PAM shaf{ be applied only to areas that drain to completed sedimentation control BMPs in accordance with the TESC Plan PAM may be reapplied on actively worked areas after a 48-hour period PAM shall not be applied during rainfall or to saturated sods 8-01.3(2)F Dates for Application of Final Seed, Fertilizer, and Mulch In the first paragraph, "Enginee�" is revised to read "Pro�ect Engineer" Note 1 of the table in the first paragraph is revised to read ' Where Contract timmg is appropriate, seeding, fertdizing, and mulching shall be accomplished durmg the fall period listed above The third paragraph is deleted 8-01.3(3) Placing Erosion Control Blanket This section including title is revised to read 8 Placing Biodegradable Erosion Control Blanket Biodegradable Erosion Control Blankets are used as an erosion prevention device and to enhance the establishment of vegetation Erosion control blankets shall be installed according to the manufacturer's recommendations Seeding and fertdizing shall be done pnor to blanket mstallation Select erosion control blanket material for an area based on the mtended function slope or ditch stabilization, and site specific factors including soil, slope gradient, rainfall, and flow exposure Erosion Control Blankets shall not be used on slopes or m ditches that exceed the manufacturer's recommendations 8 Placing Compost Blanket The first paragraph is revised to read Compost blanket shall be placed to a depth of 3 inches over bare soil Compost blanket shall be placed prior to seeding or other planting An orgarnc tack�fier shail be placed over the entire composted area when dry or windy conditions are present or expected before the final application of mulch or erosion control blanket The tackifier shall be applied immediately after the application of compost to prevent compost from leaving the composted area 8 Placing Plastic Covering The second and third paragraphs are revised to read Clear plast�c covermg shall be used to promote seed germination when seedmg is perFormed outside of the Dates for Application of Final Seed in Section 8-01 3(2)F Black plastic covering shall be used for stockpiles or other areas where vegetative growth is unwanted AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1l7/2013 Page 20 � ,� � � �� �� � ��, � �' �� �� ,� �� � ,� � � �-� 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 The plastic cover shall be installed and maintamed in a way that prevents water from cutting under the plastic and prevents the plastic cover from blowing open in the wind 8 Check Dams This section is revised to read Check dams shall be installed as soon as construction will allow, or when designated by the Engineer The Contractor may substitute a different check dam, in lieu of what is specified in the contract, with approval of the Engineer The check dam is a temporary or permanent structure, budt across a minor channel Water shall not flow through the check dam structure Check dams shall be constructed in a manner that creates a ponding area upstream of the dam to allow pollutants to settle, with water from increased flows channeled over a spdiway in the check dam The check dam shall be constructed to prevent erosion in the area below the spolway Check dams shall be placed perpendicular to the flow of water and mstalled in accordance with the Standard Plans The outer edges shall extend up the sides of the conveyance to prevent water from going around the check dam Check dams shall be of sufficient height to maximize detention, without causing water to leave the ditch Check dams shall meet the requirements in Section 9-14 5(4) 8 Geotextile Check Dam This sections content mcluding title is deleted 8 Quarry Spall Check Dam This sections content including title is deleted 8 Sandbag Check Dam This sections content including title is deleted 8 Wattle Check Dam This sections content mcluding title is deleted 8 Coir Log This sections title is revised to read 8-01.3(6)A Coir Log 8-01.3(7) Stabilized Construction Entrance The first paragraph is revised to read Temporary stabdized construction entrance shall be constructed in accordance with the Standard Plans, prior to beginning any clearing, grubbing, embankment or excavation All quarry spall material used for stabdized construction entrance shall be free of extraneous materials that may cause or contribute to track out 8 Gravel Filter, Wood Chip, or Compost Berm The first paragraph is revised to read Filter berms shall retain sediment and direct flows The gravel filter berm shall be a minimum of 1 foot m height and shall be maintained at this height for the entire time AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rewsed 1/7/2013 Page 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 they are in use Rock material used for fiiter berms shall meet the grading requirements in Section 9-03 9(2), but shall not include any recycled materials as outlined in Section 9-03 21 8-01.3(9)C Straw Bale Barrier This section including title is revised to read 8-01.3(9)C Vacant 8-01.3(11) Vacant This section includmg title is revised to read 8-01.3(11) Outlet Protection Outlet protection shall prevent scour at the outlets of ponds, pipes, ditches or other conveyances All quarry spall material used for outlet protection shall be free of extraneous material and meet the gradation requirements in Section 9-13 6 8-01.3(13) Temporary Curb This section is revised to read Temporary curbs shall divert or redirect water around erodible sods Temporary curbs shall be installed along pavement edges to prevent runoff from flowing onto erodible slopes Water shall be directed to areas where erosion can be controlled The temporary curbs shall be a mirnmum of 4 mches in height Ponding shall not be in roadways 8-01.4 Measurement The third paragraph is revised to read Check dams will be measured per Imear foot one time only along the completed check dam No additional measurement will be made for check dams that are required to be rehabditated or replaced due to wear The rnnth paragraph is deleted The finrelfth paragraph (after the preceding amendment is applied) is revised to read Seedmg, fertdizing, limmg, mulching, mowing, and tackifier wdl be measured by the acre by ground slope measurement or through the use of design data This section is supplemented with the following Outlet Protection wdl be measured per each initial mstallation at an outlet location 8-01.5 Payment The bid item "Straw Bale", per each is deleted The bid item " Erosion Control Blanket", per square yard is deleted The bid item "Sod Binder or Tacking Agent", per acre is deleted AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 7/7/2013 Page 22 1� � � � ��, � �� ,� ,� ,� �� � � � � �� ,� �' � 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 This section is supplemented with the following "Outlet Protection", per each The unit Contract price per each for "Outlet Protection" shall be full payment for all costs incurred to complete the Work "Tackifier", per acre The unit Contract price per acre for "Tackifier" shall be full payment for all costs mcurred to complete the Work "Biodegradable Erosion Control Blanket", per square yard The unit Contract price per square yard for "Biodegradable Erosion Control Blanket" shall be full pay for all costs to complete the specified Work 8-02 AP8 Section 8-02, Roadside Restoration August 6, 2012 In this section, "psiPE" is revised to read "PSIPE" 8 Topsoil Type C In this section, "9 1(2)" is revised to read "9 1(3)" 8 Planting Item number 1 m the second paragraph is revised to read Non-Irrigated Plant Material - West of the summit of the Cascade Range - October 1 to March 1 East of the summit of the Cascade Range - October 1 to November 15 8-02.5 Payment The paragraph followmg bid item "Coarse Compost", per cubic yard" is revised to read The unit Contract price per cubic yard for "Fine Compost", Medium Compost" or "Coarse ComposY' shall be full pay for furnishing and spreading the compost onto the existing sod 8-03 AP8 Section 8-03, April 2, 2012 Irrigation Systems 8-03.3(7) Flushing and Testing The fifth paragraph is deleted 8-04 AP8 Section 8-04, Curbs, Gutters, and Spillways April 2, 20'�2 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways This section is supplemented with the following new sub-section AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 8-04.3(1)B Roundabout Cement Concrete Curb and Gutter Roundabout cement concrete curb and gutter and roundabout splitter island nosmg curb shall be shaped and firnshed to match the shape of the ad�oining curb as shown in the Plans All other requirements for cement concrete curb and cement concrete curb and gutter shall apply to roundabout cement concrete curb and gutter 8 Measurement This section is supplemented with the followmg Roundabout splitter island nosing curb wdl be measured per each 8-04.5 Payment The bid item, "Roundabout Truck Apron Cement Concrete Curb", per linear foot is deleted This section is supplemented with the following "Roundabout Cement Concrete Curb and Gutte�", per Imear foot The unit Contract price per linear foot for "Roundabout Cement Concrete Curb and Gutte�" shall be full payment for all costs for the Work mcluding transitioning the roundabout cement concrete curb and gutter to the ad�oming curb shape "Roundabout Splitter Island Nosing Curb", per each The unit Contract price per each for "Roundabout Splitter Island Nosing Curb" shall be full payment for all costs for the Work including transitiornng the roundabout splitter island nosing curb to the ad�oining curb shape 8-07 AP8 Section 8-07, Precast Traffic Curb and Block TrafFc Curb January 7, 2013 This section's title is revised to read 8-07 Precast Traffic Curb 8-07.1 Description This section is revised to read This Work consists of fumishing and mstalling precast traffic sloped mountable curb or dual faced sloped mountable curb of the design and type specified m the Plans m accordance with these Specifications and the Standard Plans in the locations indicated in the Plans or as staked by the Engineer 8 Materials The matenal reference "Block Tra�c Curb 9-18 3" is deleted from this section The referenced section for the following item is rewsed to read Pamt 9-34 2 AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1l7/2013 Page ?A � ��� ,�� �� �' � � � ,� � �, r � ,� � � � �� � ,� �J 1 3 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 8 Installing Curbs The fifth and seventh paragraphs are deleted from this section 8 Measurement The first paragraph is deleted from this section 8 Payment The following bid items are deleted from this section "Type A Precast Traffic Curb", per linear foot "Type C Precast Traffic Curb", per Imear foot "Type A Block Traffic Curb", per linear foot "Type C Block Traffic Curb", per linear foot 8-11 AP8 Section 8-11, Guardrail August 6, 2012 8-11.3(1)D Removing Guardrail and Guardrail Anchor The first two sentences in the first paragraph are revised to read Removal of the various types of guardrail shall include removal of the rail, cable elements, hardware, and posts, includmg transition sections, expansion sections, terminal sections and the rad element of anchor assemblies Removal of the various types of guardrail anchors shall include removal of the anchor assembly, includmg concrete bases, rebar, steel tubes, and any other appurtenances in the anchor assembly 8 Measurement The seventh paragraph is revised to read Measurement of removal of guardrail will be by the linear foot measured along the Ime of guardrad removed including transition sections, expansion sections, guardrail anchor rad elements and termmal sections 8 Payment The paragraph followmg the bid item "Removing Guardrad Anchor", per each is revised to read The unit Contract price per each for "Removing Guardrad Anchor" shall be full payment for all costs to perform the Work as descnbed in Section 8-11 3(1)D, includmg rail removal, if there isn't a Bid Item for Removing Guardrail m the run of guardrad connecting to the anchor 8-12 AP8 Section 8-12, Chain Link Fence and Wire Fence April 2, 2012 In this Section "Engmeer' is revised to read "Pro�ect Enginee�" AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rev�sed 1/7/2013 Page 25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 8 Materials This section is supplemented with the followmg Pamt 9-08 1(2)B 8-12.3(1)A Posts The words "for Type 3 and Type 4 fences" and "on Type 3 and Type 4 fences" are deleted from this section The first sentence of the fifth paragraph is revised to read After the post is set and plumbed, the hole shall be filled with Grout Type 4 The third sentence in the sixth paragraph is replaced with the following finro sentences After the post is set and plumbed, the hole m the portion of the post in solid rock shall be filled with Grout Type 4 The grout shall be thoroughly worked into the hole so as to leave no voids The seventh paragraph is deleted The ninth paragraph is revised to read Steep slopes or abrupt topography may require changes in vanous elements of the fence It shall be the responsibility of the Contractor to provide all posts of sufficient length to accommodate the chain link fabric The tenth paragraph is revised to read All round posts shall have approved top caps fastened securely to the posts The base of the top cap f�tting for round posts sha11 feature an apron around the outside of the posts 8-12.3(1)B Top Rail This section's content mcluding title is deleted and replaced with 8-12.3(1)B Vacant 8-12.3(1)C Tension Wire and Tension Cable This section's content mcluding t�tle is revised to read 8 Tension Wire Tension Wires shall be attached to the posts as deta�led m the Plans or as approved by the Engineer 8-12.3(1)D Chain Link Fabric The first three paragraphs are revised to read Cham link fabric shall be attached after the cables and wires have been properly tensioned AMENDMENTS TO THE 2012 STANDARD SPECIFICATiONS BOOK Revised 1/7/2013 Page 26 �� � � � �� � � � ,� � � �� �� �' � �� � �� � 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 Cham link fabric shall be placed on the face of the post away from the Highway, except on horizontal curves where it shall be placed on the face on the outside of the curve unless otherwise directed by the Pro�ect Engmeer Cham link fabric shall be placed approximately 1-inch above the ground and on a straight grade between posts by excavating high points of ground Filling of depressions wdl be permitted only upon approval of the Pro�ect Engineer The fourth sentence in the fourth paragraph is revised to read The top and bottom edge of the fabric shall be fastened with hog rings to the top and bottom tension wires as may be applicable, spaced at 24-inch intervals 8-12.3(1)E Chain Link Gates The third paragraph is deleted 8 Posts In the second paragraph, "commercial" is deleted The first sentence of the fifth paragraph is revised to read After the post is set and plumbed, the hole shall be filled with Grout Type 4 The fourth sentence m the sixth paragraph is replaced with the followmg finro sentences After the post is set and plumbed, the hole in the portion of the post in solid rock shall be filled with Grout Type 4 The grout shall be thoroughly worked into the hole so as to leave no voids The tenth paragraph is revised to read Where the new fence �oins an existing fence, the 2 shall be attached in a manner satisfactory to the Pro�ect Engineer, and end or corner posts shall be set as necessary The eleventh paragraph is deleted 8-12.5 Payment The paragraph following the item "Chain Link Fence Type ", per linear foot is revised to read The unit Contract price per linear foot for "Chain Link Fence Type " shall be full payment for all costs for the specified Work including brace post installation and all other requirements of Section 8-12 for Chain Link Fence, unless covered in a separate Bid Item m this Section The following paragraph is inserted after the item "End, Gate, Corner, and Pull Post for Chain Link Fence", per each The unit Contract price per each for "End, Gate, Corner, and Pull Post for Chain Link Fence" shall be full payment for all costs for the specified Work The following paragraph is mserted after the item "Single 6 Ft Chain Lmk Gate", per each AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 27 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 The urnt Contract price per each for "Double 14 Ft Chain Lmk Gate", "Double 20 Ft Chain Lmk Gate", and "Single 6 Ft Chain Link Gate", shall be full payment for all costs for the specified Work The paragraph following the item "Wire Fence Type ", per linear foot is revised to read The urnt Contract price per each for "Wire Fence Type " shall be full payment for all costs for the specified Work mcluding payment for clearing of the fence line The following paragraph is mserted after the item "Double Wire Gate 20 Ft Wide", per each The urnt contract price per each for "Single Wire Gate 14 Ft Wide" and "Double Wire Gate 20 Ft Wide" shall be full payment for all costs for the spec�fied Work The paragraph following the item "Access Control Gate", per each is revised to read The urnt contract price per each for "Access Control Gate" shall be full payment for all costs to perform the specified Work 8-15 AP8 Section 8-15, Riprap April 2, 2012 8-15.1 Description The second paragraph is revised to read Riprap will be classified as heavy loose riprap, light loose riprap, and hand placed riprap 8-20 AP8 Section 8-20, Illumination, TrafFc Signal Systerns, And Electrical August 6, 2012 8-20.3(4) Foundations The first paragraph is revised to read Foundation concrete shall conform to the requirements for the specified class, be cast- in-place concrete and be constructed in accordance with Sections 6-02 2 and 6-02 3 Concrete for Type II, III, IV, V, and CCTV signal standards and light standard foundations shall be Class 4000P Concrete for pedestals and cabinets, Type PPB, PS, I, FB, and RM signal standards and other foundations shall be Class 3000 Concrete placed into an excavation where water is present shall be placed usmg an approved tremie If water is not present, the concrete shall be placed such that the free-fall is vertical down the center of the shaft without hitting the sides, the steel reinforcing bars, or the steel reinforcing bar cage bracing The Section 6-02 3(6) restriction for 5-feet maximum free-fall shall not apply to placement of Class 4000P concrete into a shaft Steel reinforcing bars for foundations shall conform to Section 9-07 8 Bonding, Grounding The first sentence in the second paragraph is replaced with the following two sentences AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 28 � � �� ��� � � �J ,� � � � � � ,� �� ,� � � � 1 2 4 5 6 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 All conduit installed shall have an equipment ground conductor installed in addition to the conductors noted in the Contract Condwt with mnerducts shall have an equipment ground conductor installed in each innerduct that has an electrical conductor 8-21 AP8 Section 8-21, Permanent Signing January 7, 2013 8-21.2 Materials The third sentence is revised to read Materials for sign mounting shall conform to Section 9-28 11 8 Fabrication of Steel Structures The first sentence in the first paragraph is revised to read Fabrication shall conform to the applicable requirements of Section 6-03 and 9-06 This section is supplemented with the following All fabrication, includmg repairs, adJustments or modifications of previously fabricated sign structure members and connection elements, shall be perFormed in the shop, under an Engineer approved shop drawing prepared and submitted by the Contractor for the original fabrication or the specific repair, adJustment or modification Sign structure fabrication repair, adJustment or modification of any kind in the field is not permitted if fabrication repair, adJustment or modification occurs after a sign structure member or connection element has been galvarnzed, the entire member or element shall be re- galvanized m accordance with AASHTO M 111 < 8 Vacant This section mcludmg title is revised to read 8-21.3(9)B Erection of Steel Structures Erection shall conform to the applicable requirements of Sections 6-03 and 8-21 3(9)F Section 8-21 3(9)F notwithstanding, the Contractor may erect a sign bridge prior to completion of the shaft cap portion of one foundation for one post provided the following conditions are satisfied The Contractor shall submit design calculations and working drawings of the temporary supports and falsework supporting the sign bridge near the location of the mcomplete foundation to the Engineer for approval in accordance with Section 6-01 9 The submittal shall include the method of releasing and removing the temporary supports and falsework without mducing loads and stress into the sign bridge 2 The Contractor shall submit the method used to secure the anchor bolt array m proper position with the sign bridge while casting the shaft cap concrete to complete the foundation 3 The Contractor shall erect the sign bridge and temporary supports and falsework, complete the remairnng portion of the incomplete foundation, and AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rev�sed 1/7/2013 Page 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 remove the temporary supports and falsework, m accordance with the working drawing submittals as approved by the Engineer 8 Foundations The following new paragraph is inserted after the second paragraph Concrete placed into an excavation where water is present shall be placed using an approved tremie If water is not present, the concrete shall be placed such that the free- fall is vertical down the center of the shaft without h�tting the sides, the steel reinforcing bars, or the steel reinforcing bar cage bracing The Section 6-02 3(6) restriction for 5- feet maximum free-fall shall not apply to placement of Class 4000P concrete into a shaft The ninth paragraph (after implementing the preceding Amendment) is replaced with the following three new paragraphs After construction of concrete foundations for sign bridge and cantdever sign structures, the Contractor shall survey the foundation locations and elevations, the anchor bolt array locations and lengths of exposed threads The Contractor shall confirm that the survey conforms to the sign structure post, beam, span and foundation design geometry shown in the Plans, and shall identify any deviations from the design geometry shown in the Plans When deviations are identified, the Contractor shall notify the Engineer, and such notice shall be accomparned by the Contractor's proposed method(s) of addressmg the deviations, including removal and reconstruction of the shaft cap portion of the affected concrete foundation as outlined m this Section, or fabrication repair, ad�ustment or modification, with associated shop drawings, in accordance with Section 8-21 3(9)A If the Contractor's survey indicates that a concrete foundation has been constructed incorrectly for a sign structure that has already been fabricated, the Contractor may remove and reconstruct the shaft cap portion of the foundation, in accordance with Section 1-07 13, provided the following conditions are satisfied The Contractor shall submit the method and equipment to be used to remove the portion of the concrete foundation to be removed and reconstructed to the Engineer for approval in accordance with Section 1-05 3 The submittal shall include confirmation that the eqwpment and the method of operation is appropnate to ensure that the existing anchor bolt array and primary shaft vertical steel reinforcing bars wdl not be damaged 2 All steel reinforcmg bars, except for steel reinforcing bars extending from the bottom portion of the foundation to remain, shall be removed and disposed of in accordance with Sections 2-02 3 and 2-03 3(7)C, and shall be replaced with new steel reinforcing bars conforming to the size, dimensions and geometry shown in the Plans All concrete of the removed portion of the foundation shall be removed and disposed of in accordance with Sections 2-02 3 and 2- 03 3(7)C 3 The Contractor shall ad�ust the primary shaft vertical steel reinforcing bars as necessary in accordance with Section 6-02 3(24)C to provide clearance for the anchor bolt array AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rewsed 1/7/2013 Page 30 � �� � � � ,� � � � � � �� �� � � ,� �` �� � 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Sign structures shall not be erected on concrete foundations untd the Contractor confirms that the foundations and the fabricated sign structures are either compatible with each other and the design geometry shown in the Plans, or have been modified in accordance with this Section and as approved by the Engineer to be compatible with each other, and the foundations have attained a compressive strength of 2,400-psi Item number 4 in the finrelfth paragraph (after implemented the preceding Amendments) is revised to read 4 Concrete shall be Class 4000P, except as otherwise specified The concrete for the shaft cap (the portion containing the anchor bolt array assemblies above the construction �oint at the top of the shaft) shall be Class 4000 Item number 3 in the thirteenth paragraph (after implemented the preceding Amendments) is revised to read 3 Unless otherwise shown in the Plans, concrete shall be Class 4000P 8 Payment This section is supplemented with the followmg All costs in connection with surveying completed concrete foundations for sign bndges and cantilever sign structures shall be included in the lump sum contract price for "Structure Surveying", except that when no Bid item is included m the Proposal for "Structure Surveying" then such costs shall be mcluded in the lump sum contract price(s) for "Sign Bridge No " and "Cantdever Sign Structure No " 8-22 AP8 Section 8-22, Pavement Marking January 7, 2013 8-22.3(3)D Line Applications The last paragraph is supplemented with the following Grooved line pavement marking shall not be constructed on bridge decks or on bridge approach slabs 8 Removal of Pavement Markings The following finro new sentences are inserted after the first sentence Grinding to remove painted markings is not allowed Grmding to remove plastic markmg is allowed to a depth �ust above the pavement surface, then water blasting or shot blasting shall be required to remove the remaming markings 8 Measurement The items "Pamted Wide Line" and "Plastic Wide Line" are deleted from the fourth paragraph The sixth paragraph is revised to read AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 Diagonal lines used to delineate parkmg stalis that are constructed of painted or plastic 4-inch lines will be measured as "Paint Line" or "Plastic Line" by the linear foot of line installed Crosswalk Ime wdl be measured by the square foot of marking installed The following two new paragraphs are inserted after the sixth paragraph Crosshatch markings used to delineate median and gore areas will be measured by the completed linear foot as "Painted Crosshatch Marking" or "Plastic Crosshatch Markmg" The measurement for "Painted Crosshatch Markmg" and for "Plastic Crosshatch Marking" wdl be based on the total length of each 8-inch or 12-inch wide line installed 8 Payment The bid items "Painted Wide Line", per linear foot and "Plastic Wide Line", per linear foot are deleted from this section This section is supplemented with the following two new bid items "Painted Crosshatch Marking", per linear foot "Plastic Crosshatch Marking�, per linear foot The following new paragraph is inserted after the last bid item in this section The unit Contract price for the aforementioned Bid items shall be full payment for all costs to perform the Work as descnbed m Section 8-22 8-25 AP8 Section 8-25, Glare Screen April 9, 2012 in this section, "tension cable" and "cable" are deleted 8 Posts The first sentence in the first paragraph is revised to read Posts shall be constructed m accordance with the Standard Plans and applicable provisions of Section 8-12 3(1)A The last paragraph is revised to read All round posts for Type 1 Design B and Type 2 glare screen shall be fitted with a watertight top securely fastened to the post Line posts shall have tops designed to carry the top tension wire 8-25.3(5) Tension Cables This sections content including title is deleted 8 Fittings, Attachments, and Hardware This sections content mcluding title is deleted AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 32 � � � �� � � ,� � � � � � � � � �� � � � 1 8-29 AP8 2 Section 8-29, Wire Mesh Slope Protection 3 January 7, 2013 4 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 This section is deleted in its entirety and replaced with the following 8-29 Wire Mesh Slope Protection 8-29.1 Description This Work consists of fumishing and installing the anchors and the wire mesh slope protection in accordance with these Specifications and the detads shown in the Plans and in conformity with the lines and dimensions shown in the Plans or established by the Engineer 8 IlAaterials Materials shall meet the requirements of Section 9 4 8-29.3 Construction Requirements 8-29.3(1) Submittals The Contractor shall submit a wire mesh slope protection plan to the Pro�ect Engineer a mmimum of seven calendar days prior to beginrnng the work The wire mesh slope protection plan shall include the following Plan sheets for anchor layout and installation, and the equipment and process used to confirm the capacity of the constructed anchors including the calibration data for the stressing devices used to proof test the anchors, as completed by an`independent testmg laboratory within 60 calendar days of the wire mesh slope work 2 Working drawings for the temporary yoke or load frame to be used for anchor proof testing in accordance with Section 6-01 9 3 Plans and details for assembling wire mesh and erecting the assembled mesh on the slope All costs for the Work required for Submittals shall be included in the unit Bid price detailed in Section 8-29 5 8 Anchors The Contractor shall install anchors of the type shown in the Plans and m conformance with the layout shown in the Wire Mesh Protection Plan as described in Section 8- 29 3(1) The spacing and number of the anchors and wire ropes as shown in the Plans are approximate only, and upon review of the wire mesh slope protection plan, the Engineer may arrange the spacing to better hold the wire mesh agamst the slope Backfdl material shall be thoroughly compacted with a mechanical compactor The Contractor shall proof test up to 25 percent of the anchors in vertical pullout to the mirnmum allowable anchor capacity specified in the Plans Proof testing of anchors shall be performed against a temporary yoke or load frame No part of the temporary yoke or load frame shall bear within three feet of the anchor being tested For vertical pullout proof testing, an anchor is acceptable if it sustains the specified capacity for 10 minutes with no loss of load Anchors that fad this critenon shall be replaced and retested if more than three anchors fad, the Contractor shall proof test all anchors AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Rewsed 1/7/2013 Page 33 � 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 8 Wire Rope All wire rope loops shall include a thimble No wire rope splicmg wdl be allowed 8 Wire Mesh The wire mesh shall be fastened to the completed wire rope assembly as shown in the Plans High tensde steel fasteners on the vertical seams shall be staggered across width of the seam Horizontal splices �oining 2 rolls of inesh shall be made by overlapping the mesh approximately 3 feet and either weaving 3 rows of lacmg wires through every mesh openmg or using 4 rows of high tensde steel fasteners placed on approximately 3-mch spacmg All top and bottom laps shall be made by folding the mesh to the outside, away from the slope, to avoid the possibdity of falling material hangmg up in the folds The bottom of the mesh shall be located as shown in the Plans The ends of all lacing wires shall be secured to the mesh with a minimum of 1'/-turns The wire mesh shall not be tensioned in any direction, but is to remain loose so as to increase its dampening effect on rolling rocks The Contractor shall use care in the handling and installing of the wire mesh and wire rope Any mesh or wire rope damaged due to the Contractor's operations shall be replaced by the Contractor at no expense to the Contracting Agency 8 Measurement Measurement of anchors will be per each for the completed anchor Anchor types will not be differentiated Wire mesh slope protection will be measured by the square foot of wire mesh erected on the slope There wdl be no deduction made for overlapping the wire mesh material as required for splices or for coverage due to variations m the slope or ground conditions 8 Payment Payment wdl be made m accordance with Section 1-04 1, for each of the following Bid items that are included in the Proposal "Wire Mesh Slope Protection Anchor", per each The unit Contract price per each for "Wire Mesh Slope Protection Anchor" shall be full payment for all costs for the Work descnbed in Sections 8-29 3(1) and 8-29 3(2) "Wire Mesh Slope Protection", per square foot The unit Contract price per square foot for "Wire Mesh Slope Protection" shall be full payment for all costs for the Work described in Section 8-29 3(3) and 8-29 3(4) 9-02 AP9 Section 9-02, Bituminous Materials January 7, 2013 9 Anti Additive This section is revised to read Anti-stripping additive shall be a product listed in the current WSDOT Qualified Products List (QPL) AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rewsed 1/7/2073 Page 34 � � �� � � � � �� � � � � � � � � �� � � 1 9-03 AP9 2 Section 9-03, Aggregates 3 January 7, 2012 4 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 9-03.1(1) General Requirements The eighth paragraph is deleted 9-03.13 Backfill for Sand Drains This section is supplemented with the following That portion of backfill retained on a No 4 sieve shall not contain more than 0 05 percent by weight of wood waste 9-03.13(1) Sand Drainage Blanket The last paragraph is revised to read That portion of backfill retained on a No 4 sieve shall not contain more than 0 05 percent by weight of wood waste 9-03.14(1) Gravel Borrow Note' is deleted, including the reference in the table 9-03.14(2) Select Borrow Note' is deleted Note 2 is re-numbered Note', including the reference in the table 9-03.14(4) Gravel Borrow for Geosynthetic Retaining Wall This section is revised to read All backfill material for geosynthetic retairnng walls shall consist of granular material, either naturally occurring or processed, and shall be free draining, free from orgarnc or otherwise deleterious matenal The material shall be substantially free of shale or other soft, poor durabdity particles, and shall not contain recycled materials, such as glass, shredded tires, portland cement concrete rubble, or asphaltic concrete rubble The backfill material shall meet the following requirements for grading and quality S�eve S�ze Percent Passin 1 '/< " 99-100 1" 90-100 No 4 50-80 No 40 30 maac No 200 7 0 max Sand E uivalent 50 rrun All percentages are by weight Pro e Test Method Allowable Test Value Los Angeles Wear AASHTO T 96 35 percent max 500 rev De adat�on Factor WSDOT Test Method 113 15 rrun H, ermanent walls AASHTO T 289 4 5-9 AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 35 , H, tem o walls AASHTO T 289 3-10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 Wall backfdl material satisfying these grading and property requirements shall be classified as nonaggressive 9-03.21(1) General Requirements The first sentence in the first paragraph is revised to read Hot Mix Asphalt, Concrete Rubble, Recycled Glass (glass cullet), and Steel Furnace Slag may be used as, or blended uniformly with naturally occurring materials for aggregates 9 Vacant This section including title is revised to read 9 Recycled Glass (Glass Cullet) Glass Cullet shall meet the requirements of AASHTO M 318 with the additional requirement that the glass cullet is limited to the maximum amounts set m Section 9- 03 21(1)E for recycled glass Prior to use the Contractor shall provide certification to the Pro�ect Engineer that the recycled glass meets the physical properties and deleterious substances reqwrements in AASHTO M-318 9-03.21('i) E Table on Maximum Allowable Percent (By Weight) of Recycled Material The column headmg "Recycled Glass" is revised to read "Recycled Glass (Glass Cullet) in the table In the column "Recycled Glass (Glass Cullet)" all amounts are revised to read "20" begmning with the item "Ballast" and continuing down until the last �tem in the table 9-04 AP9 Section 9-04, Joint And Crack Seaiing Materials January 7, 2013 9-04.2 Joint Sealants This section is supplemented with the following new sub-sections 9-04.2(3) Polyurethane Sealant Polyurethane sealant shall conforrn to ASTM C 920 Type S Grade NS Class 25 Use M Polyurethane sealant shall be compatible with the closed cell foam backer rod When required, compatibility characterist�cs of sealants in contact with backer rods shall be determined by Test Method ASTM C 1087 9 Closed Cell Foam Backer Rod Closed cell foam backer rod for use with polyurethane sealant shall conform to ASTM C 1330 Type C 9 Crack Sealing — Rubberized Asphalt This section is deleted AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 36 �J � �� � � � � � � � � � � � �� , � II � '�� � /� 1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 9-04.11 Butyl Rubber and Nitrile Rubber This sections number is revised to read 9-04.10 9-05 AP9 Section 9-05, Drainage Structures, Culverts, and Conduits January 7, 2013 9-05.0 Acceptance by Manufacturer's Certification This section including title is revised to read 9 Acceptance and Approval of Drainage Structures, and Culverfs The Dramage Structure or Culvert may be selected from the Qualified Products List, or submitted using a Request for Approval of Materials (RAM) in accordance with Section 1-06 Certain dramage materials may be accepted by the Engineer based on a modified acceptance criteria when materials are selected from the Qualified Products List (QPL) The modified acceptance criteria are defined in the QPL for each material 9-05.1(6) Corrugated Polyethylene Drain Pipe, Couplings, and Fittings (Up to 10 Inch) This section is supplemented with the following Corrugated polyethylene drain pipe manufacturers shall participate in the National Transportation Product Evaluation Program (NTPEP) work plan for HDPE (High Density Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website displaymg they are NTPEP compliant 9-05.1(7) Corrugated Polyethylene Drain Pipe, Couplings, and Fittings (12 Inch Through 60 Inch) This section is supplemented with the following Corrugated polyethylene drain pipe manufacturers shall participate in the National Transportation Product Evaluation Program (NTPEP) work plan for HDPE (High Density Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website displaying they are NTPEP compliant 9 Perforated Corrugated Polyethylene Underdrain Pipe (Up to 10 Inch) This section is supplemented with the following PerForated corrugated polyethylene underdrain pipe manufacturers shall participate in the National Transportation Product Evaluation Program (NTPEP) work plan for HDPE (High Density Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website displaying they are NTPEP compliant 9-05.2(8) Perforated Corrugated Polyethylene Underdrain Pipe (12-Inch Through 60 Inch Diameter Maximum), Couplings, and Fittings This section is supplemented with the following AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 7/7I2013 Page 37 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 Perforated corrugated polyethylene underdram pipe manufacturers shall participate in the National Transportation Product Evaluation Program (NTPEP) work plan for HDPE (High Density Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website displaying they are NTPEP compliant 9-05.19 Corrugated Polyethylene Culvert Pipe, Couplings, and Fittings The word "producer" is revised to read "manufacturer" The second paragraph is revised to read Joints for corrugated polyethylene culvert pipe shall be made with either a bell/bell or bell and spigot coupling and shall mcorporate the use of a gasket conforming to the requirements of ASTM D 1056 Type 2 Class B Grade 3 or ASTM F 477 All gaskets shall be factory installed on the coupling or on the pipe by the qualified manufacturer This section is supplemented with the followmg Corrugated polyethylene culvert pipe manufacturers shall partiapate in the National Transportation Product Evaluation Program (NTPEP) work plan for HDPE (High Density Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website displaying they are NTPEP compliant 9 Corrugated Polyethylene Storm Sewer Pipe, Couplings, and Fittings The word "producer" is revised to read "manufacturer" The first paragraph is revised to read Corrugated polyethylene storm sewer pipe, couplings, and fittmgs shall meet the requirements of AASHTO M 294 Type S or D The maximum pipe diameter for corrugated polyethylene storm sewer pipe shall be the diameter for which a manufacturer has submitted Fittings shall be blow molded, rotational molded, or factory welded This section is supplemented with the following Corrugated polyethylene culvert pipe manufacturers shall participate in the National Transportation Product Evaluation Program (NTPEP) work plan for HDPE (High Density Polyethylene) Thermoplastic Pipe and be listed on the NTPEP audit website displaying they are NTPEP compliant 9-05.24 Polypropylene Culvert Pipe, Polypropylene Storm Sewer Pipe, and Polypropylene Sanitary Sewer Pipe This sections content is deleted and replaced with the following All �oints for polypropylene pipe shall be made with a bell/bell or bell and spigot couplmg and shall conform to ASTM D 3212 usmg elastomeric gaskets conforming to ASTM F 477 All gaskets shall be factory installed on the pipe in accordance with the producer's recommendations Qualification for each producer of polypropylene storm sewer pipe requires �omt system conformance to ASTM D 3212 using elastomeric gaskets conforming to ASTM F 477 and a formal quality control plan for each plant proposed for consideration AMENOMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 38 � � ,� � � � � ,� � � � � ' � ' � � � �� 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 A Manufacturer's Certificate of Compliance shall be required and shall accompany the materials delivered to the pro�ect The certificate shall clearly identify production lots for all materials represented The Contractmg Agency may conduct venfication tests of pipe stiffness or other properties it deems appropriate This section is supplemented with the followmg new sub-sections 9 Polypropylene Culvert Pipe and Storm Sewer Pipe Polypropylene culvert and storm sewer pipe shall conform to the following requirements 1 2 3 4 For dual wall pipe sizes up to 30 inches ASTM F2736 For triple wall pipe sizes from 30 to 60 inches ASTM F2764 For dual wall profde pipe sizes 36 to 60 inches AASHTO MP 21, Type S or Type D Fittings shall be factory welded, in�ection molded or PVC 9 Polypropylene Sanitary Sewer Pipe Polypropylene sanitary sewer pipe shall conform to the following requirements 1 2 3 For pipe sizes up to 30 mches ASTM F2736 For pipe sizes from 30 to 60 inches ASTM F2764 Fittings shall be factory welded, in�ection molded or PVC 9-06 AP9 Section 9-06, Structural Steel and Related Materials Aprii 2, 2012 9-06.5(3) High Strength Bolts In this section, "AASHTO M 291" is revised to read "ASTM A 563" 9-07 AP9 Section 9-07, Reinforcing Steel August 6, 2012 9-07.7 Wire Mesh The first sentence m the first paragraph is revised to read Wire mesh for concrete reinforcement shall conform to the requirements of AASHTO M 55, Welded Steel Wire Fabric for Concrete Reinforcement or AASHTO M 221, Steel Welded Wire Remforcement, Deformed for Concrete AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2073 Page 39 ; � 1 2 3 4 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 9-10 AP9 Section 9-10, Piling April 2, 2012 9-10.4 Steel Pile Tips and Shoes tn the first paragraph "ASTMA A 148 Grade 60-90" is revised to read "ASTMA A 148 Grade 90-60" 9-14 AP9 Section 9-14, Erosion Control and Roadside Planting January 7, 2013 9-14.3 Fertilizer The second sentence in the first paragraph is revised to read It may be separate or in a mixture containmg the percentage of total nitrogen, avadable phosphoric acid, and water-soluble potash or sulfur in the amounts specified 9-14.4(2) Hydraulically Applied Erosion Control Products (HECPs ) The first sentence in the third paragraph is revised to read All HECPs shall be furnished premixed by the manufacturer with Organic or Synthetic Tackifier as specified m Section 9-14 4(7) The third and fourth rows in Table 1 is revised to read Heavy Metals EPA 6020A Total Metals Antimony — < 4 mg/kg Arsemc — < 6 mg/kg Banum — < 80 mg/kg Boron — < 160 mg/kg Cadm�um — < 2 mg/kg Total Chrorruum — < 4 mg/kg Copper — < 10 mg/kg Lead — < 5 mg/kg Mercury — < 2 mg/kg N�ckel — < 2 mg/kg Selemum — < 10 mg/kg Stront�um — < 30 mg/kg Zmc — < 30 m Water Holdmg ASTM D 7367 800 percent mimmum Ca aci 9-14.4(2)A Long Term Mulch In the first paragraph, the phrase "within 2 hours of application" is deleted 9-14.4(4) Wood Strand Mulch The last sentence in the second paragraph is deleted This section is supplemented with the following new paragraph The Contractor shall provide Material Safety Data Sheet (MSDS) that demonstrates that the product is not harmful to plant life and a test report performed in accordance with AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rev�sed 1/7/2013 Page 40 � � � � � :J � ' � � � ' � � � � L_J � � � � � � � � � ' L� � � r � � �� � � ,� 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 WSDOT Test Method 125 demonstratmg compliance to this specification prior to acceptance 9 Compost The second paragraph is revised to read Compost production and quality shall comply with WAC 173-350 and for biosolids composts, WAC 173-308 The third paragraph is to read Compost products shall meet the following physical criteria Compost material shall be tested in accordance with U S Composting Council Testing Methods for the Examination of Compost and Composting (TMECC) 02 02-B, "Sample Sieving for Aggregate Size Classification" Fine compost shall meet the following gradation Sieve Size Percent Passin Mia�mum Ma�mum 1" 100 / 90 100 ��4�� / S 1 �� Note Maximum particle length of 4 mches Medium compost shall meet the following gradation S�eve Size Percent Passm M�n�mum Maximum 1" 100 /$" 85 100 '/a" 70 85 Note Maximum particle length of 4 inches Medwm compost shall have a carbon to rntrogen ration (C N) between 18 1 and 35 1 The carbon to nitrogen ration shall be calculated using dry weight of "Organic Carbon" using TMECC 04 01A divided by the dry weight of "Total NH usmg TMECC 04 02D Coarse compost shall meet the following gradation Sieve S�ze Percent Pass�n Mimmum Maz�mum 2" 100 1" 90 100 '/a" 70 100 '/<" 40 60 Note Maximum particle length of 6 inches Coarse compost shall have a carbon to nitrogen ratio (C N) between 25 1 and 35 1 The carbon to nitrogen ratio shall be calculated using the dry weight of "Orgarnc Carbon" using AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 47 LJ 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 TMECC 04 01A divided by the dry weight of "Total N" using TMECC 04 02D 2 The pH shall be befinreen 6 0 and 8 5 when tested in accordance with U S Composting Councd TMECC 04 11-A, "1 5 Slurry pH" 3 Manufactured inert material (plastic, concrete, ceramics, metal, etc ) shall be less than 1 percent by weight as determmed by U S Composting Counal TMECC 03 08-A "Classification of Inerts by Sieve Size" 4 Mirnmum organic matter shall be 40 percent by dry weight basis as determined by U S Composting Council TMECC 05 07A "Loss-On-Ignition Organic Matter Method (LOI)" 5 Soluble salt contents shall be less than 4 0 mmhos/cm when tested in accordance with U S Composting Councd TMECC 04 10 "Electrical Conductivity " �,� � 7 Maturity shall be greater than 80 percent in accordance with U S Compostmg Council TMECC 05 05-A, "Germination and Root Elongation" Stability shall be 7-mg CO2—C/g OM/day or below in accordance with U S Composting Council TMECC 05 08-B "Carbon Dioxide Evolution Rate" 8 The compost product shall originate from orgarnc waste as defined in WAC 173 350 as "Type 1 Feedstocks", "Type 2 Feedstocks", and/or "Type 3 Feedstocks" The Contractor shall provide a list of feedstock sources by percentage in the fmal compost product 9 The Engineer may also evaluate compost for maturity using U S Composting Councd TMECC 05 08-E "Solvita� Maturity Index" Fme compost shall score a number 6 or above on the Solvita� Compost Maturity Test Medwm and coarse compost shall score a 5 or above on the Solvita� Compost Maturity Test 9 Compost Approval This section's title is revised to read 9-14.4(8)A Compost Submittal Requirements The first sentence in this section up untd the colon is revised to read The Contractor shall submit the following information to the Engineer for approval Item No 2 in the first paragraph is revised to read 2 A copy of the Solid Waste Handling Permit issued to the manufacturer by the Jurisdictional Health Department in accordance with WAC 173-350 (Mmimum Functional Standards for Solid Waste Handling) or for biosolid composts a copy of the Coverage Under the General Permit for Biosolids Management issued to the manufacturer by the Department of Ecology in accordance with WAC 173-308 (Biosolids Management) AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 42 � � � � � � � ' � � � � � J �� � � �� � � � � � � � �J � � � � � � � , � � 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 90 31 9-14.5(1) Polyacrylamide (PAM) The third sentence is replaced with the following finro new sentences The minimum average molecular weight shall be greater than 5-mg/mole The charge density shall be no less than 15 percent and no greater than 30 percent 9-14.5(2) Erosion Control Blanket This section mcludmg title is deleted in its entirety and replaced with the following 9-14.5(2) Biodegradable Erosion Control Blanket Biodegradable erosion control blankets shall be made of natural plant fibers, and all nettmg material, if present, shall biodegrade within a life span not to exceed 2 years The Contractor shall provide independent test results from the National Transportation Product Evaluation Program (NTPEP) meeting the requirements of Section 9-14 5(2)B, 9-14 5(2)C and 9-14 5(2)D 9-14.5(2)A Approval and Acceptance of Biodegradable Erosion Control Blankets The erosion control blanket may be selected from the Qualified Products List, or submitted using a Request for Approval of Materials (RAM) in accordance with Section 1-06 Erosion control blankets may be accepted by the Engmeer based on the modified acceptance criteria when materials are selected from the QPL The modified acceptance cnteria are defined in the QPL for each material 9-14 5(2)B Biodegradable Erosion Control Blanket for Slopes Steeper than 3:1 (H.� Table 6 Properties ASTM Test Method Requirements for Slopes Steeper than 3•1 Protecting ASTM D 6459 C factor = 0 04 maximum for Slopes from cumulative R-Factor<231 Rainfall-Induced Soil tested shall be sandy Erosion loam as defined by the NRCS"'* Soil Te�ure Triangle Mass Per Unit ASTM D 6475 7 6 oz /sq yd minimum Area Light ASTM D 6567 44 % maximum Penetration Tensde Strength ASTM D 6818 10 0 x 6 0 pounds/inch minimum MD x XD* Tensile ASTM D 6818 38% x 33% maximum Elongation MD x XD* � � AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 43 1 3 4 5 6 7 8 9 10 11 12 13 'MD is Machine Design and XD is Cross Direction `*Natural Resource Conservation Services 9-14.5(2)C Biodegradable Erosion Control Blanket for Slopes Flatter than 3.1(H:� Table 7 Properties ASTM Test Method Slope Flatter than 3:1 Requirements Protecting ASTM D 6459 C factor = 0 15 maximum for Slopes from cumulative R-Factor<231 Rainfall-Induced Sod tested shall be sandy Erosion loam as defined by the NRCS** Sod Texture Triangle Mass Per Unit ASTM D 6475 7 6 oz /sq yd mirnmum Area Light ASTM D 6567 40% maximum Penetration Tensile Strength ASTM D 6818 6 5 x 2 3 pounds/inch minimum MD x XD* Tensde ASTM D 6818 38% x 33% maximum Elongation MD x ° XD* *MD is Machine Design and XD is Cross Direction **Natural Resource Conservation Services 9-14.5(2)D Biodegradable Erosion Control Blanket for Ditches Table 8 Properties Test Method Requirements Performance in ASTM D 6460 Limitmg Shear (T�, = 2 0 psf Protecting Sod tested shall be sandy minimum Earthen loam as defined by the Channels from NRCS** Limiting Velocity (V�, = 7 5 Stormwater- Sod Texture Triangle ft/sec flow min�mum induced Erosion Mass per Urnt ASTM D 6475 7 4 oz / sq yd minimum Area AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 7/7/2013 Page 44 � � � � � J � � � � � ,� � � � � -, �i �! � � � � � � � � 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Light ASTM D 6567 65 % maximum Penetration Tensile Strength ASTM D 6818 9 6 x 3 2 Ibs/inch minimum MD x XD* Tensile ASTM D 6818 38% x 33% maximum Elongation MD x XD* *MD is Machine Design and XD is Cross Direction **Natural Resource Conservation Services 9-14.5(4) Geotextile Encased Check Darro This section including title is revised to read 9 Check Dams All materials used for check dams shall be non-toxic and not pose a threat to wddlife when installed This section is supplemented with the following new sub-sections 9 Biodegradable Check Dams Biodegradable check dams shall meet the following requirements Biodegradable Check Dams Materials Wattle Check Dam 9-14 5(5) Compost Sock Check Dam 9-14 5(6) Coir Log Check Dam 9-14 5(7) The Contractor may substitute a different biodegradable check dam as long as it complies with the following and is approved by the Engineer 1 � Made of natural plant fiber Netting if present shall be biodegradable 9 Non Check Dams Non-biodegradable check dams shall meet the following requirements 1 Geotextde materials shall conform to section 9-33 for silt fence 2 Other such devices that fulfill the requirements of section 9-14 5(4) and shall be approved by the Engineer prior to installation 9 Description In item No C in the fourth paragraph, "22-mch" is revised to read "2-inch" AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 45 �J 1 9-16 AP9 2 Section 9-16, Fence and Guardrail 3 January 7, 2013 4 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 9 Post Material for Chain Link Fence The first paragraph is revised to read Except as noted otherwise, post material shall conform to the requirements of AASHTO M 181, Type 1(zinc-coated steel), Grade 1 or 2, and shall include all round and roll- formed material (line posts, brace posts, end posts, corner posts, and pull posts) The last sentence in the fourth paragraph is deleted 9 Tension Wire and Tension Cable This section including title is revised to read 9 Tension Wire Tension wire shall meet the requirements of AASHTO M 181 Tension wire galvanizing shall be Class 1 9 Fittings and Hardware The second sentence in the first paragraph is deleted The last paragraph is deleted 9 Approval This section is deleted 9 Approval This section is deleted 9 Wire Mesh This section is revised to read The galvanized wire mesh shall be a Style 1 double-twisted hexagonal mesh conforming to ASTM A 975 with 8 by 10 opernng, except when a colorized, polyvinyl chloride coating is reqwred then the Style shall be a Style 3 The longitudinal edges of the wire mesh fabnc shall have knuckled selvedges with continuous selvedge wire as specified in ASTM A 975 9 Wire Rope This section is revised to read Wire rope shall be �/- inch-diameter, independent wire rope class (IWRC) 6x19, extra improved plow steel (EIP) wire rope galvarnzed in accordance with ASTM A1023 Each lot of wire rope shall be accompanied by a Manufacturer's Certificate of Compliance, a mdl certificate, and a test report showing the wire rope meets the mirnmum breaking force requirements of ASTM A 1023 AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 46 � � � � � � � �, � � �, �� �� � J � ' � � I JI � � � � � � � � � � � i ' � � � ' � � � 1 2 3 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 9-16.4(4) Hardware This section is revised to read Weldless steel rings shall be drop-forged steel and heat treated after forging, have a single pull, workmg load limit of at least 10,000 Ibs, and meet perFormance requirements of Federal Specification RR-C-271 D Type VI Thimbles required for all wire rope loops shall be standard weight, galvanized, and meet performance requirements of Federal Specification �F-T-276b Type II Wire rope clips shall have drop-forged steel bases, be galvanized, and meet performance requirements of Federal Specification FF-C-450 Type I Class 1 9 Hog Rings and Tie Wire This section mcluding title is revised to read 9-16.4(5) Fasteners and Lacing Wire Fasteners shall consist of 11 gauge high tensde steel Lacing wire shall consist of 9 gauge, zinc-coated steel wire conformmg to ASTM A 641 9 Grout This section mclude title is deleted 9-16.4(7) Anchor This section includmg title and section number is revised to read 9 Ground Anchors Threaded bar ground anchors shall be deformed, continuously threaded, steel re�nforcement bars conforming to either Section 9-07 2 or Section 9-07 11 Threaded bar ground anchors shall be either epoxy-coated m accordance with Sections 6- 02 3(24)H and 9-07 3 or galvarnzed after fabrication in accordance with ASTM A 767 Class I Hollow-core anchor bars shall have continuous threads/deformations and be fabricated from steel tubing conforming to ASTM A 519 Couplers and nuts shall provide 100% of the guaranteed m�nimum tensde strength of the hollow core anchor bars Bearing plates shall conform to ASTM A 572 Grade 50 and shall be galvanized after fabncation in accordance with AASHTO M 111 Nuts shall conform to either AASHTO M 291 Grade B, hexagonal, or Section 9-07 11 Nuts shall be galvarnzed after fabrication m accordance with AASHTO M 111 for plate washers and AASHTO M 232 for all other hardware Grout for ground anchors shall be Grout Type 2 for Nonshrmk Applications, conforming to Section 9-20 3(2) Concrete for soil anchor deadmen shall be either commercial concrete conformmg to 8 Section 6-02 3(2)B or Class 3000 conforming to Section 6-02 Steel reinforcing bars for sod anchor deadmen shall conform to Section 9-07 2, and shall be epoxy-coated in accordance with Sections 6-02 3(24)H and 9-07 3 AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 117/2013 Page 47 �J 1 3 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 9 Posts This section is revised to read Line posts for Types 1 and 2 glare screens shall be 2 inch inside diameter galvarnzed steel pipe with a nominal weight of 3 65 pounds per linear foot End, corner, brace, and pull posts for Type 1 Design A and B and Type 2 shall be 2'/z inch inside diameter galvarnzed steel pipe with a nominal weight of 5 79 pounds per linear foot Intermediate pull posts (braced line posts) shall be as specified for Ime posts The base mater�al for the manufacture of steel pipes used for posts sha{I conform to the requirements of ASTM A 53, except the weight tolerance on tubular posts shall be applied as provided below Posts provided for glare screen will have an acceptance tolerance on the weight per linear foot, as specified, equal to plus or minus 5 percent This tolerance wdl apply to each individual post All posts shall be galvanized in accordance with AASHTO M 181 Sect�on 32 The mmimum average zinc coating is per square foot of surface area This area is defined as the total area inside and outside A sample for computing the average of mass of coating is defined as a 12-inch piece cut from each end of the galvanized member 9 Cable This section including title is revised to read 9-16.6(5) Vacant 9-16.6(6) Cable and Tension Wire Attachments This section includmg title is revised to read 9 Tension Wire Attachments All tension wire attachments shall be galvanized steel conforming to the requirements of AASHTO M 232 unless otherwise specified Eye bolts shall have either a shoulder or a back-up nut on the eye end and be provided with an eye nut where needed or standard hex nut and lock washer �/-inch diameter for tension wire and of sufficient length to fasten to the type of posts used Turnbuckles shall be of the shackle end type, '/z inch diameter, with standard take-up of 6 inches and provided with 9 / inch diameter pms 9 Fabric Bands and Stretcher Bars The first paragraph is revised to read Fabric bands shall be % inch by 1 mch nommal Stretcher bars shall be 3 /, 6 inch by �/ inch nominal or 5 /, s inch diameter round bar nominal A 5 /, g inch diameter round stretcher bar shall be used with Type 1 Nommal shall be construed to be the area of the cross section of the shape obtained by multiplymg the specified width by thickness A variation of mmus 5-percent from this theoretical area shall be construed as "nominal" size All shall be galvarnzed to meet the requirements of ASTM F 626 AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 � � � LJ [� � � � � � i � � � � , � Page 48 � � � � � � �� � � � ' � U 'J � � L� � , � , � 1 9-18 AP9 2 Section 9-18, Precast Traffic Curb and Block Traffic Curb 3 August 6, 2012 4 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 This section's title is revised to read 9-18 Precast Traffic Curb 9-18.3 Block TrafFc Curb This section mcluding title is revised to read 9-18.3 Vacant 9-20 AP9 Section 9-20, Concrete Patching Material, Grout, and Mortar January 2, 2012 9-20.3(3) Grout Type 3 for Unconfined Bearing Pad Applications This section is revised to read Grout Type 3 shall be a prepackaged matenal meetmg the requirements of ASTM C 928 — Table 1, R2 Concrete or Mortar 9 Grout Type 4 for Multipurpose Applications In the third sentence of the first paragraph, the reference "0 40" is revised to read "0 45" 9-23 AP9 Section 9-23, Concrete Curing Materials and Admixtures April 2, 2012 9-23.2 Liquid Membrane-Forming Concrete Curing Compounds In the first paragraph, "moisture loss" is revised to read "water retention" 9-28 AP9 Section 9-28, Signing Materials and Fabrication September 17, 2012 9-28.14(2) Steel Structures and Posts "AASHTO M 291" is revised to read "ASTM A 563" 9-29 AP9 Section 9-29, Illumination, Signal, Electrical January 7, 2013 9-29.1(4) Non-Metallic Conduit This section is supplemented with the following new sub 9 Deflection Fittings Deflection Fittings for use with rigid PVC conduit shall be as described in 9-29 1(2)A AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rev�sed 1/7/2013 Page 49 . , , �_� 1 2 3 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 9 Junction Boxes, Cable Vaults, and Pull Boxes The section is supplemented with the following The Contractor shall perForm quality control inspection The Contracting Agency intends to perform Quality Assurance Inspection By its inspection, the Contracting Agency intends only to verify the quality of that Wo�lc This inspection shall not relieve the Contractor of any responsibility for identifying and replacmg defective material and workmanship Prior to the start of production of the precast concrete urnts, the Contractor shall advise the Engineer of the production schedule The Contractor shall give the Inspector safe and free access to the Work If the Inspector observes any nonspecification Work or unacceptable quality control practices, the Inspector wdl advise the plant manager If the corrective action is not acceptable to the Engineer, the unit(s) wdl be re�ected 9 Standard Duty and Heavy Junction Boxes The third paragraph is deleted and replaced with the following new paragraphs The Contractor shall provide shop drawmgs for all components, mcluding the concrete box, and Lid and the shop drawings shall show placement of reinforcing steel The shop drawing shall be prepared by (or under the direct supervision ofl a Professional Engmeer, licensed under Title 18 RCW, State of Washington, in the branch of Civil or Structural, and each sheet shall carry the following Professional Engineer's ongmal signature, date of signature, original seal, registration number, and date of expiration � 3 The initials and dates of all participatmg design professionals Clear notation of all revisions mcludmg identification of who authorized the revision, who made the revis�on, and the date of the revision 4 Design calculations shall carry on the cover page, the Professional Engineer's original signature, date of signature, original seal, registration number, and date of expiration For each type of �unction box, or whenever there is a change to the �unction box design, a proof test, as defined m this Specification, shall be performed and new shop drawmgs submitted 9 Standard Duty Junction Boxes The sub-paragraph's titled "Concrete Junction Boxes" are revised to read Concrete Junction Boxes The Standard Duty Concrete Junction Box steel frame, lid support, and lid shall be painted with a black paint contairnng rust mhibiters or painted w�th a shop applied, inorganic zinc primer in accordance with Section 6-07 3, or hot-dip galvanized in accordance with AASHTO M 111 All Standard Duty Concrete Junction Boxes placed m sidewalks, walkways, and shared-use paths shall have slip-resistant surfaces Slip- reisistant lids and frames shall be hot dip galvanized Concrete used m Standard Duty Junction Boxes shall have a mmimum compressive strength of 6,000 psi when reinforced with a welded wire hoop, or 4,000 psi when AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rewsed 1/7/2013 Page 50 � � � � � � � r � � � � � � � � � � � � � �-, u � � , � [J � J � � � LJ � � I� ��� ll u ' �I 1 2 4 5 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 reinforced with welded wire fabric or fiber reinforcement The frame shall be anchored to the box by welding headed studs g/8 by 3 inches long, as specified in Section 9-06 15, to the frame The wire fabnc shall be attached to the studs and frame with standard tie practices The box shall contam ten studs located near the centerline of the frame and box wall The studs shall be placed one anchor m each corner, one at the middle of each width and two equally spaced on each length of the box Matenals for Type 1, 2, and 8 Concrete Junction Boxes shall conform to the followmg Materials Requirement Concrete Section 6-02 Reinforcing Steel Section 9-07 Fiber Reinforcing ASTM C 1116, Type III Lid ASTM A 786 diamond plate steel Slip Resistant Lid ASTM A 36 steel Frame ASTM A 786 diamond plate steel or ASTM A36 steel Slip Resistant Frame ASTM A 36 steel Lid Support ASTM A 36, or ASTM A1011 Grade SS Handle & Handle support ASTM A 36 steel or ASTM A1011 Grade CS or SS Anchors (studs) Section 9-06 15 ASTM F 593 or A 193, Type 304 or 316, or Bolts, Studs, Nuts, Stainless Steel grade 302, 304, or 316 Washers - steel m accordance with approved shop drawin Locking and Latching �n accordance with approved shop Mechanism Hardware drawings and Bolts 9 Heavy Duty Junction Boxes The section is revised to read Heavy-Duty Junction Boxes shall be concrete and have a minimum vertical load rating of 46,000 pounds without permanent deformation and 60,000 pounds without fadure when tested m accordance with Section 9-29 2(1)C The Heavy-Duty Junction Box steel frame, lid support and lid shall be pamted with a �{� applied, inorgarnc zinc Materials for Type 4, 5, and 6 Concrete Junction Boxes shall conform to the following Materials Requirement Concrete Section 6-02 Reinforcing Steel Section 9-07 ASTM A 786 diamond plate steel, rolled Lid from plate complying with ASTM A 572, rade 50 orASTM A 588, and havm a AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 57 2 3 4 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 min CVN toughness of 20 ft-Ib at 40 de rees F Frame and stiffener ASTM A 572 grade 50 or ASTM A 588, both plates with mm CVN toughness of 20 ft-Ib at 40 de rees F Handle ASTM A 36 steel or ASTM A 1011 Grade CS or SS Anchors (studs) Section 9-06 15 Bolts, Studs, Nuts, ASTM F 593 orA 193, Type 304 or 316, or Washers Stainless steel grade 302, 304, or 316 m accordance with a roved sho drawin Hinges and Lockmg and In accordance with approved shop Latching Mecharnsm - drawings Hardware and Bolts The lid stiffener plates shall bear on the frame, and be milled so that there is full even contact, around the perimeter, between the bearmg seat and lid stiffener plates, after fabrication of the frame and lid The bearmg seat and lid perimeter bar shall be free from burrs, dirt, and other foreign debris that would prevent solid seating Bolts and nuts shall be liberally coated with anti-seize compound Bolts shall be mstalled snug tight The bearing seat and lid perimeter bar shall be machined to allow a minimum of 75 percent of the bearing areas to be seated with a tolerance of 0 0 to 0 005 inches measured with a feeler gage The bearing area percentage wdl be measured for each side of the lid as it bears on the frame 9 Testing Requirements The first paragraph is revised to read The Contractor shall provide for testing of �unction boxes, cable vaults and pull boxes Junction boxes, cable vaults and pull boxes shall be tested by an independent materials testing facdity, and a test report issued documenting the results of the tests performed The second paragraph is revised to read For concrete �unction boxes, vaults and pull boxes, the independent testing laboratory shall meet the requirements of AASHTO R 18 for Qualified Tester and Verified Test Equipment The test shall be conducted in the presence of a Professional Engineer, licensed under Title 18 RCW, State of Washington, in the branch of Civil or Structural, and each test sheet shall have the Professional Engmeer's origmal signature, date of signature, original seal, registration number, and date of expiration One copy of the test report shall be furnished to the Contracting Agency certifying that the box and cover meet or exceed the loadmg requirements for a concrete �unction box, and shall mclude the followmg information Product identification 2 Date of testing 3 Description of testing apparatus and procedure 4 All load deflection and fadure data AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rewsed 1/7/2013 � �l � � � � � L�J � � � � I � �� � � � � Page 52 � �i �' L; � 1 � � � i � � 1 � L� � � � � � L� �� 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 5 0 7 Weight of box and cover tested Upon completion of the required test(s) the box shall be loaded to failure A brief descnption of type and location of fadure The third paragraph is revised to read For non-concrete �unction boxes the independent testing laboratory shall meet the requirements of AASHTO R 18 for Qualified Tester and Verified Test Equipment The test shall be conducted in the presence of a Professional Engineer, licensed under Title 18 RCW, State of Washmgton, in the branch of Civd or Structural, and each test sheet shall have the Professional Engineer's original signature, date of signature, original seal, registration number, and date of expiration One copy of the test report shall be furnished to the Contractmg Agency certifying that the box and cover meet or exceed the loading requirements for a non-concrete �unction box, and shall include the following information Product identification 2 Date of testing 3 Description of testing apparatus and procedure 4 All load deflection data 5 Weight of box and cover tested The first paragraph following the title "Testing for the Standard Duty Non-Concrete Junction Boxes" is revised to read Non-concrete Junction Boxes shall be tested as defined m the ANSI/SCTE 77-2007 Tier 15 test method with test load minimum of 22,500 Ibs in addition, the Contractor shall provide a Manufacture Certificate of Compliance for each non-concrete �unction box installed 9 Standard Duty and Heavy Cable Vaults and Pull Boxes This section is revised to read Standard Duty and Heavy-Duty Cable Vaults and Pull Boxes shall be constructed as a concrete box and as a concrete lid The lid for the Heavy-Duty and Standard Duty Cable Vaults and Pull Boxes shall be mterchangeable and both shall fit the same box as shown in the Standard Plans The Contractor shall provide shop drawings for all components, including concrete box, Cast Iron Ring, Ductile Iron Lid, Steel Rmgs, and Lid In addition, the shop drawings shall show placement of remforcing steel, knock outs, and any other appurtenances The shop drawing shall be prepared by or under the direct supervision of a Professional Engineer, licensed under Title 18 RCW, State of Washington, in the branch of Civil or Structural, and each sheet shall carry the following AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 53 � 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 � 3 Professional Engineer's original signature, date of signature, original seal, registration number, and date of expiration The initials and dates of all participating design professionals Clear notation of all revisions mcluding identification of who authorized the revision, who made the revision, and the date of the revision 4 Design calculations shall carry on the cover page, the Professional Engmeer's original signature, date of signature, original seal, registration number, and date of expiration For each type of box or whenever there is a change to the Cable Vault or Pull box design, a proof test, as defined in this Specification, shall be perFormed and new shop drawings submitted 9 Standard Duty Cable Vaults and Pull Boxes This section is revised to read Standard Duty Cable Vaults and Pull boxes shall be concrete and have a mirnmum load rating of 22,500 pounds and be tested in accordance with Section 9-29 2(1)C for concrete Standard Duty Junction Boxes Concrete for standard duty cable vaults and pull boxes shall have a mmimum compressive strength of 4,000 psi The lid frame shall be anchored to the vault/box concrete lid by weldmg headed studs �/8 by 3 inches long, as specified in Section 9- 06 15, to the frame The wire fabnc shall be attached to the studs and frame with standard tie practices The vault/box concrete lid shall contam ten studs located near the centerline of the frame and wall Studs shall be placed one anchor m each corner, one at the middle of each width and finro equally spaced on each length of the vault/box The steel frame, lid support, and lid shall be painted with a black paint contairnng rust inhibiters or painted with a shop applied, inorgarnc zinc primer in accordance with Section 6-07 3 or hot-dip galvarnzed in accordance with ASTM M 111 All Standard Duty Cable Vaults and Pull Boxes placed m sidewalks, walkways, and shared-use paths shall have slip-resistant surfaces The steel frame, lid support, and lid for the Standard Duty Cable Vaults and Pull Boxes shall be hot-dip galvarnzed Materials for Standard Duty Cable Vaults and Pull Boxes shall conform to the following Materials Requirements Concrete Section 6-02 Reinforcing Steel Section 9-07 Lid ASTM A 786 diamond plate steel Slip Resistant Lid ASTM A 36 Steel Frame ASTM A 786 diamond plate steel or ASTM A 36 Slip Resistant Frame ASTM A 36 Steel Lid Support ASTM A 36 Steel, orASTM A 1011 Grade SS AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2073 LJ � � � r-, u i L-� � LJ � � �J � � ' i 1 Page 54 � � � !I LJ L� � u � rl �J C� �� � � � � J � ' ' � 1 2 4 5 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Handle & Handle ASTM A 36 steel or ASTM A 1011 Grade Su ort CS or SS Anchors (studs) Section 9-06 15 Bolts, Studs, Nuts, ASTM F593 orA 193, type 304 or 316, or Washers Stainless steel grade 302, 304, 316 per a roved sho drawin Hmges and Lockmg Mechanism Hardware Per approved shop drawings and Bolts 9 Heavy Cable Vaults and Pull Boxes This section is revised to read Heavy-Duty Cable Vaults and Pull Boxes shall be constructed of concrete having a minimum compressive strength of 4,000 psi, and have a minimum vertical load ratmg of 46,000 pounds without permanent deformation and 60,000 pounds without failure when tested in accordance with Section 9-29 2(1)C for Heavy-Duty Junction Boxes Materials for Heavy Duty Cable Vaults and Pull boxes shall conform to the followmg Materials Requirements Concrete Section 6-02 Reinforcing Steel Section 9-07 Cover Section 9-05 15(1) Ring Section�9-0515(1) � Anchors (studs) Section 9-06 15 ASTM F 593 or A 193, Type 304 or 316, or Bolts, Nuts, Washers Stamless steel grade 302, 304, 316 in accordance with a roved sho drawin 9 Slip Base Hardware "AASHTO M 291" is revised to read "ASTM A 563" 9 Foundation Hardware "AASHTO M 291" is rewsed to read "ASTM A 563" 9-29.10 Luminaires The third paragraph is revised to read All luminaires shall be provided with markers for positive identification of light source type and wattage Markers shall be 3 inches square with Gothic bold, black 2-inch legend on colored background Background color shall be gold for high-pressure sodium and red for metal halide, and white for mduction light sources Legends shall be sealed with transparent film resistant to dust, weather, and ultraviolet exposure 9 Decorative Luminaries The second sentence m the third paragraph is deleted AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Rev�sed 1/7/2013 Page 55 � 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 9 Auxiliary Equipment for NEMA Controllers In the first paragraph, item number's 8-13 are renumbered to read 9-14 respectfully Item number 7 in the first paragraph is revised to read 7 A"Display Panel" when noted in the Contract The display panel shall depict a generic eight-phase operation The panel shall be mounted on the mside of the front cabinet door and the mounting shall be of a design that allows positioning of the panel in four orientations 90 degrees from each other The mountmg shall be removable without use of any tools Incandescent red, yellow, green, walk and don't walk indicator lights shall be provided for each phase The indicator lights shall be connected to the assoaated field terminals The connecting cable shall be long enough to allow for any mountmg orientation No diodes wdl be allowed m the display panel A means of disconnecting all wiring entering the panel shall be provided Switches shall be provided on the panel w�th labels and functions as fouoWs a �•7 c Display On — Signal mdicator lamps wdl display the operation of the intersection Test — All indicator lamps shall be energized Display Off — All signai indicator lamps shall be de-energized The following new numbered item is inserted after item number 7 8 A"Detector Panel", as specified m Section 9-29 13(7)D, shall be installed The panel shall be mounted on the inside of the front cabinet door The detector panel shall be constructed as a single unit Detector switches with separate operate, test, and off positions shall be provided for each field detector mput circuit A high intensity light emitting diode (LED) shall be provided for each switch The lamp shall energize upon vehicle, pedestrian or test switch actuation The test switch shal! provide a spring loaded momentary contact that wdl place a call into the controller When in the OFF position, respective detector circuits will be disconnected In the operate position, each respective detector circuit shall operate normally Switches shall be provided on the panel with labels and functions as follows a � Display On — Detector indicator lights shall operate consistent with their respective switches Display Off — detector indicator lights shall be de-energized A means of disconnecting all wiring entermg the panel shall be provided The disconnect shall include a means to �umper detection calls when the display panel is disconnected All switches on the panel shall be marked with its associated Plan detector number All markers shall be permanent 9-29.13(7)E Type 170E, 170E-HC-11, 2070, 2070 Lite, ATC Controller Cabinets The following new title is inserted after the fifth sentence in the first paragraph AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Rewsed 1/7/2013 Page 56 � � � � i � ' � � � � � � ' � � � � ! _� �I � � LJ r-, fJ � � � � ' 'J � � � ' � � �1 1 2 3 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 9-29.13(7)F Ramp Meter, Traffic Data, and Warning Sign Cabinets 9-29.16(1)A1 Conventional Optical Systern This section's title is revised to read 9-29.16(1)A1 Non-LED Optical System 9-29.16(1)D1 Electrical - Conventional This section's title is revised to read 9-29.16(1)D1 Electrical — Non-LED 9-29.20 Pedestrian Signals This section is revised to read Pedestrian signals shall be Light Emitting Diods (LED) type The LED pedestrian s�gnal module shall be operat�onally compatible with controllers and conflict morntors The LED lamp unit shall contain a disconnect that will show an open switch to the conflict morntor when less than 60 percent of the LEDs in the urnt are operational The Pedestrian signal heads shall be on the QPL or the Contractor shall submit a Manufacturer's Certificate of Compliance, in accordance w�th Standard Spec�fication 1- 06 3, with each type of signal head The certificate shall state that the lot of pedestnan signal heads meet the following requirements All pedestrian signal heads shall be a Walk/Don't Walk module with a countdown display 2 All pedestrian displays shall comply with the MUTCD and ITE publication ST 011 B, VTCSH2 or current ITE Specification and shall have an incandescent appearance The Contractor shall provide test results from a Nationally Recognized Testmg Laboratory documenting that the LED display conforms to the current ITE and the following requirements a All pedestrian signals supplied to any one pro�ect shall be from the same manufacturer and type but need not be from the same manufacturer as the vehicle heads b Each pedestrian signal face shall be a single unit housing with the signal indication size, a nominal 16 inch x 18 mch with side by side symbol messages with countdown display c Housings shall be green polycarbonate or die-cast aluminum and the aluminum housings shall be painted with finro coats of factory applied traffic signal green enamel (Federal Standard 595-14056) All hinges and latches and interior hardware shall be stainless steel 3 Optical units for traff�c s�gnal displays shall conform to the following AMENDMENTS TO THE 2072 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 Page 57 � � 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 a Pedestrian "RAISED HAND" and "WALKING PERSON" modules shall be the countdown display type showing the time remainmg in the pedestrian change mterval When the pedestrian change interval is reduced due to a programming change, the display may contmue to show the previous pedestrian change interval for one signal cycle During the following pedestrian change interval the countdown shall show the revised time, or shall be blank In the event of an emergency vehicle preemption, during the following finro cycles, the display shall show the programmed pedestrian change interval or be blank In the event the controller is put in stop time during the pedestrian change interval, durmg the following two cycles the display shall show the programmed clearance or be blank In the event there is radroad preempt dunng the pedestnan change mterval, during the following finro cycles the display shall show the programmed clearance or be blank Light emitting diode (LED) light sources having the incandescent appearance are required for Portland Orange Raised Hand and the Lunar White Walking Person C�7 c C Voltage The operating voltages sha{I be befinreen 85 VAC and 135 VAC Temperature Temperature range shall be -35° F to +165° F LED pedestrian heads shall be supplied with Z crate visors Z crate visors shall have 21 members at 45 degrees and 20 horizontal members 9 Neon Grid Type This section is deleted 9 Senrice Cabinets In the first paragraph, the lettered items A-J are re-lettered to read B-K respectFully The first paragraph is supplemented with the following new lettered item A Display an arc flash warning label that meets the requirements of ANSI Z535 9 Amplifier, Transformer, and Terminal Cabinets In item No 2 C,"Transformer 23 1 to 12 5 KVA" is revised to read "Transformer 3 1 to 12 5 KVA" and the height column value of 40" is revised to read "48n The first and second sentences in the first paragraph are revised to read Amplifier and terminal and transformer cabmets shall be NEMA 3R and the following Item number 5 is revised to read 5 All cabmets shall provide a gasketed door flange Item number 7 is revised to read 7 Insulated terminal blocks shall be 600 volt, heavy-duty, barrier type The termmal blocks sha11 be provided with a fiefd-side and a control-side connector separated by a marker strip One spare 12-position insulated terminal block shall be installed in each terminal cabinet and amplifier cabinet AMENDMENTS TO TFtE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2013 � � � � � � C.�; � � � , ' � ' � , � Page 58 � I� � LJ � ' � � �1 L� � , � LJ ' � � �J � I_ � ' � � 1 2 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Item number 8 is revised to read 8 Each non-pad mounted Terminal, Amplifier and Transformer cabinet shall have 1/4 inch drain holes m back corners Each pad mounted Terminal, Amplifier and Transformer cabinet shall drain to a sump and through a 3/8 inch diameter drain pipe to grade as detaded in the Standard Plans Item number 10 is revised to read 10 Transformer cabinets shall have two separate compartments, one for the transformer and one for the power distribution circuit breakers Each compartment shall be enclosed with a dead front Each breaker shall be labeled with the device name by means of a screwed or riveted engraved name plate 9-34 AP9 Section 9-34, Pavement Marking Material April 2, 2012 9-34.2 Paint The second paragraph is revised to read Blue and black paint shall comply with the requirements for yellow paint in Section 9- 34 2(4) and Section 9-34 2(5), with the exception that blue and black paints do not need to meet the requirements for titanium dioxide, directional reflectance, and contrast ration AMENDMENTS TO THE 2012 STANDARD SPECIFICATIONS BOOK Revised 1/7/2073 Page 59 � , THIS PAGE LEFT INTENTIONALLY BLANK � � i 1 1 ' � ' � � , � � J ' ' �� ' � � 'J � �J LJ ' PART III SPECIAL PROVISIONS � � , �� THIS PAGE LEFT INTENTIONA�LY BLANK � � ' � � L' � � � � � , , ' � ' ' � � ' � ' � � � r ' , � ' � L_J ' ' INTRODUCTION TO THE SPECIAL PROVISIONS �*****� The work on this pro�ect shall be accomplished �n accordance �nnth the Standard Spec�ficat�ons for Road, Bndge and Mun�cipal Construct�on, 2012 ed�tion, as �ssued by the Washington State Department of Transportat�on (WSDOT) and the American Public Works Associanon (APWA), Washington State Chapter (hereafter "Standard Specifications") The Standard Specificahons, as modified or supplemented by the Amendments to the Standard Specificarions and these Special Provisions, all of which are made a part of the Contract Documents, shall govern all of the Work These Special Provis�ons are made up of both General Special Provisions (GSPs) from various sources, wh�ch may have pro�ect-specific fill-ins, and pro�ect-specific Special Provisions Each Prov�sion e�ther supplements, modifies, or replaces the comparable Standard Specificarion, or is a new Provision The delehon, amendment, alteration, or add�non to any subsect�on or porhon of the Standard Spec�ficanons is meant to pertain only to that panc�ular portion of the sechon, and in no way should �t be interpreted that the balance of the sechon does not apply The pro�ect-specific Spec�al Prov�sions are not labeled as such The GSPs are labeled under the headers of each GSP, �nnth the date of the GSP and rts source, as follows (May 18, 2007 APWA GSP) (August 7, 2006 WSDOT GSP) (April 7, 2007 C�ty of Bremerton GSP) - C�ty of Bremerton GSPs are ►nd►cated by the characters (*****) - C►ty of Bremerton new sect�ons are indicated by the text (NEW SECTION) Also �ncorporated �nto the Contract Documents by reference are the following documents The Contractor shall obtain copies of these publ�cabons, at Contractor's own expense Manual on Un�form Traffic Control Dev�ces for Streets and Highways, currently adopted edrtion, �nnth Washington State modificanons, if any - Standard Plans for Road, Bridge and Mun�c�pal Construcdon, WSDOT/APWA, current edition - City of Bremerton Standards for Work m the R�ght-of-Way (available at http //www ci bremerton wa us/d�splay php��d=424 ' Crty of Bremerton Eastsrde Beach Marn Replacement March 2013 SP-I ' � THIS PAGE LEFT INTENTIONALLY BLANK � , , � ' , � � � a t � � , � � Cety of Bremerton March 2013 ' Easu:de Beach Ma:n Replacement ` SP - 2 ' � � ' SPECIAL PROVISIONS - TABLE OF CONTENTS DIVISION 1 GENERAL- REQUIREMENTS .............................................................................. 7 , 1-01 DEFINITIONS AND TERMS . .. 7 1-013 Definitions . ... . . . . .. . . 7 1-02 1 Prequalification of Bidders .. . . . 10 ' 1-02 2 Plans and Specificanons . . .. . . . . . . 10 1-02 5 Proposal Forms . . . . . . . 10 1-02 6 Preparation of Proposal . . . . . .. .. . 11 ' 1-02 7 Bid Deposit . . .. . 11 1-02 8 Non-Collusion Declaration . . .. . 12 � 1-02 9 Delivery of Proposal : . : . . . . 12 1-02 13 Irregular Proposals 12 1-02 14 Disqualificahon of Bidders . . .. .. 13 � 1-02 15 Pre Award Information . . .. .. . 14 1-02 16 Addenda and Interpretahons of Documents (NEW SECTION) . 15 1-03 AWARD AND EXECUTION OF CONTRACT . . . .. 15 , 1-03 1 Consideration of Bids : : . . . . . . 15 1-03 2 Award of Contract 15 1-03 3 Execution of Contract . .. .. . . . . .. 15 ' 1-03 4 Contract Bond . :: : : . . : . . 16 1-03 7 )udicial Review 1� 1-04 SCOPE OF WORK . . . -- • . • • 17 ' 1-0412 Phased Notice to Proceed (NEW SECTION) . . . 17 1-05 CONTROL OF WORK • 18 1-05 3 Plans and Working Dra�nnngs. . .. .. . . 18 ' 1-05 4 Conformity with and Deviahons from Plans and Stakes . 18 1-05 5 Submittals (NEW SECTION) 19 1-05 5(1) General . . . . . ... . . 19 ' 1-05 5(2) Contractor's Responsibilit�es . . . . : . . . .. . 20 1-05 5(3) Request for Substitution or Deviation . 20 1-05 5(4) Categories of Submittals . . . .. 21 ' 1-05 5(5) Submittal Transmittal Procedure : . . .. . 22 1-05 5(6) Submittal Review Procedure 23 1-05 5(7) Required Submittals . .. . .. . . . . . .. . 23 ' 1-05 7 Removal of Defect�ve and Unauthorized Work .. .. . 25 1-0510 Guarantees . ... . 26 1-05 11 Final Inspection . . . . .. . . . .26 ' 1-05 11(1) Substantial Complehon Date .. . . 26 1-05 11(2) Final Inspection and Physical Complet�on Date . . 27 1-05 16 Water and Power (NEW SECTION) . . .. . 27 / 1-0517 Oral Agreements (NEW SECTION) . . .... 27 1-06 CONTROL OF MATERIAL . . - 27 ' C�ty of Bremerton March 2013 Eastsrde Beach Marn Replacemettt SP - 3 � ' 1-06 1 Approval of Materials Prior To Use ... . .. 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC .. . 1-071 Laws to be Observed . . . .. . .. . 1-07 2 State Sales Tax .. . . 1-07 2(1) State Sales Tax — Rule 171 . . .. . 1-07 2(2) State Sales Tax — Rule 170 . . . 1-07 2(3) Services . . .. . . . . . . . 1-07 5 Environmental Regulat�ons . .. . . 1-07 5(2) State Department of Wildlife and Fisheries .. . .. . 1-07 6 Permits and Licenses . . ... .. 1-07 9(5) Required Documents . . . .. .. . . . . 1-0716 Protect�on and Restorarion of Property . .. .. ... . . . . 1-07 16(1) Lot Corners or Permanent Control Points (NEW SECTION) . 1-0716(2) Preconstruction Photographs (NEW SECTION) .. . .. 1-0717 Uhlities and Similar Facilities.. . . . . . . . .. . . . . . 1-07 17(3) Underground Ut�lit�es (NEW SECTION) .. . .. 1-07 17(4) Contractor's Responsibility for Unlity Properties & Services (NEW SECTION) . . . . . . . . 1-0717(5) List of Utility Owners .. . . . . . . . 1-07 18 Public Liability and Property Damage Insurance .. . . 1-0718 Insurance . . . . . . . . . 1-0718(1) General Requirements . . . .. . . . 1-0718(2) Additional Insured . . . . . . ... . 1-0718(3) Subcontractors . . . . . . . 1-0718(4) Evidence of Insurance . . .. . . . 1-0718(5) Coverages and Limits . . . . ... . . 1-07 23 Public Convenience and Safety . .. . ... .. 1-07 23(1) Construction Under Traffic . . .. . 1-07 23(2) Construction and Maintenance of Detours ... .. . 1-07 24(1) Staging Area and Beach Access via Land (NEW SECTION) . 1-07 24(2) Opt�onal Use of Lions Park West Parkmg Lot (NEW SECTION) . 1-07 28 Potennal for Contaminated Soils (NEW SECTION) .. .. . 1-07 29 Asbestos-Cement Pipe Handling and Disposal (NEW SECTION) .. 1-07 30 Permitting Agency Requirements for Construction on the Beach (NEW SECTION) . . . . .. . . 1-08 PROSECUTION AND PROGRESS . . .. .. . . 1-08 0 Preliminary Matters . . . .. .. . . 1-08 0(1) Preconstruction Conference .. . . . 1-08 0(2) Hours of Work . . . . . . .. . . . 1-08 0(3) Reimbursement for OT Work of Contrachng Agency Employees 1-08 0(4) Weekly Construct�on Meetings (NEW SECTION) .. .. 1-08 0(5) Other Meetings (NEW SECTION) . . . . 1-08 0(6) Construction Constraints and Work Sequence (NEW SECTION) . 1-08 3 Progress Schedule . . . . . .. . .. . . 1-08 3(1) General Requirements . . . . 27 28 28 29 29 29 30 30 30 30 30 31 31 32 32 32 32 33 34 34 34 35 35 35 36 37 37 38 39 41 42 42 42 44 44 45 45 46 46 46 46 47 47 , ' ' , , i � ' -- �� u ' L' � ' � � Cny of Bremerton Easts:de Beach Marn Replacement March 2013 SP-4 ' ' , �' ' ' � ' � � � � ' � ' , I � � , ' 1-08 3 (2) Progress Schedule Types . . . . . . . . 47 1-08 4 Not�ce to Proceed and Prosecution of the Work . .. . . 47 1-08 5 Time of Complet�on . . . 48 1-08 9 Liquidated Damages . . . . .. . . . .. 48 1-09 MEASUREMENT AND PAYMENT .. . . . 48 1-09 1 Measurement of Quantiries . . .. . 48 1-09 1(1) Quanhty Reporting Requirements (NEW SECTION) . 48 1-09 6 Force Account . . .. . .. .. . . . . 49 1-09 6(1) Force Account Repoi Requirements (NEW SECTION) . 49 1-09 7 Mobilization . . .. . . . . 50 1-09 8 Payment for Material on Hand .. .. . . 50 1-09 11(3) Time Limitation and Jurisdiction . .. . .. .. 51 1-09 13(3) Claims $250,000 orless . . 51 1-0913(4) Procedures to Pursue Arbitration . . . . 51 1-10 TEMPORARY TRAFFIC CONTROL ... . 52 1-101 General . . . . . . . 52 1-101(2) Descript�on .. . . . . . . 53 1-10 2 Traffic Control Management .. .. .. . . . 53 1-10 2(1) General . . . . . . . .. . . . . . 53 1-10 2(2) Traffic Control Plans .. . . . 54 1-10 3 Traffic Control Labor, Procedures and Devices .. . 54 1-10 3(3) Traffic Control Devices . . . .. . .. 54 1-10 4 Measurement . . . . . .. 55 1-10 5 Payment . . . . . . 55 DIVISION2 EARTHWORK .................................................................................................... 56 2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP . 56 2-011 Descriphon . . . . . 56 2-012(1) Disposal Method No 1- Open Burning . 56 2-012(2) Disposal Method No 2- Waste Site . . .. 56 2-013 Construct�on Requirements . .. . . . 56 Z-013(4) Cleanup and Restorahon . . . . . . . . 56 2-014 Measurement . . . .. ... . . . . .. ... . 57 2-015 Payment - 57 2-04 HAUL . . . . 57 2-04 4 Measurement . . . . . . . 57 2-04 5 Payment . .. . . . . . . . . 57 2-07 WATERING . . .. . - - 57 2-071 Descript�on . . • - -- 57 2-07 5 Payment . . . . .. . . 57 SECTION 2-09, STRUCTURE EXCAVATION . . . . 58 2-091 Descriphon . . . . 58 2-09 3 Construction Requirements . . . 58 2-09 3(1) General Requirements .. .. . . 58 2-09 3[4) Construction Requirements, Structure Excavat�on, Class B . 58 2-09 4 Measurement . . . . . 59 C:ry of Bremerton March 2013 Easuuie Beach Ma:n Replacement SP - S , � 2-09 5 Payment . . . . . . ... . 59 DIVISION4 BASES ................................................................................................................. 60 4-04 BALLAST AND CRUSHED SURFACING . . . .. 60 4-041 Descript�on . . . . . 60 4-04 4 Measurement . . . . . . . . . .. 60 4-04 5 Payment . . . . . . . ................ 60 DIVISION 5 SURFACE TREATMENTS AND PAVEMENTS .................................. 61 5-04 HOT-MIX ASPHALT . . . . . . . . . . 61 5-041 Descript�on . . . . . . . . .. . 61 5-04 4 Measurement. . . . .. . .. . 61 5-04 5 Payment . . . . . . . . . .. .. .. . .. 61 DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, WATER MAINSAND CONDUITS ............................................................................................................. 62 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS . .. .... 62 7-08 2 Materials .. .. . . .. . . . . . .. . . . 62 7-08 3 Construchon Requirements . . . . . .. . . .. . 62 7-08 4 Measurement . . . . 64 7-08 5 Payment . .. . . . . . . . . . . . . 64 7-17 SANITARY SEWERS . . . . . . . 64 7-171 Descriphon .. . . . . . . . 64 7-17 2 Materials .. .. . . . . . . . . . . 65 7-17 3 Construct�on Requirements .. . . . . . . . . 65 7-17 4 Measurement . .. . . . . . . 70 7-17 5 Payment . . . . . . . .. . . 70 DIVISION 8- MISCELLANEOUS CONSTRUCTION .................................................................. 72 8-01 EROSION CONTROL . . . 72 8-013 Construction Requirements . . . . . 72 8-014 Measurement. . . . . . . . . . 73 8-015 Payment . . . . . . . . . .. . . 73 8-05 BEACH MITIGATION AND CLEANUP (NEW SECTION) ... 73 8-051 Description. . . . .. . . . .73 8-05 2 Materials . . . . .. . . .. . . . 73 8-05 3 Construction Requirements . . . . . . . 73 8-05 4 Measurement. . . . .. . . . . . 75 8-05 5 Payment . . .. .. . . ............... 75 DIVISION9 - MATERIALS ........................................................................................... 76 9-05 DRAINAGE STRUCTURES, CULVERTS, AND CONDUITS ... 76 9-05 23 Descripnon . . . . .. . .. . 76 Crty of Bremerton March 2013 Easts:de Beach Ma:n Replacement SP - 6 , ' , � ' � � ' ' � � , ' L_J ' ' ' � , ' , DIVISION 1 1-01 � � 1-01.3 �*****� GENERAL REQiJIREMENTS DEFINITIONS AND TERMS Definrtions This Sect�on ►s supplemented w►th the following � � �I �� ' � ' , �.J ' , ' � All references in the Standard Specificanons to the terms "State", "Department of Transportahon", "Washington State Transportahon Comm�ss�on", "Commission', "Secretary of Transportat�on", "Secretar}�', "Headquarters', and "State Treasurer" shall be revised to read "Contrachng Agenc�' All references to "State Matenals Laborator}�' shall be revised to read "Contracring Agency designated location" The venue of all causes of achon ar�sing from the adverhsement, award, execuhon, and performance of the contract shall be in the Supenor Court of the County where the Contrachng Agenc�s headquarters are located Alternate One of two or more units of work or groups of bid rtems, identified separately in the proposal, from which the ContracUng Agency may make a choice between different methods or material of construction for performmg the same work. City The word "City" shall mean the City of Bremerton, Department of Public Works and Uriliries, 3027 Olympus Dnve, Bremerton, Washington, 98310 Commission, Washington State Transportation Commission Subshtute the follo�nnng The words "Commission" or "Washington State Transportation Commission" shall refer to the Crty of Bremerton C�ty Council Contract Documents See defimt�on for "Contract" Contract Time The penod of t►me established by the terms and condirions of the contract �nnthm which the work must be substanrially complete The contract t�me is m calendar days Contracting Agency The C�ty of Bremerton, Deparmient of Public Works and Unlibes, 3027 Olympus Dnve, Bremerton, Washington, 98310 acting through rts legally const�tuted officials, agents, officers, or employees, is respons�ble for the execution and administration of the Contract. ' Crty of Bremerton Easu:de Beach Marn Replacement March 2013 SP-7 � ' Dates Bid Opening Date The date on which the Contrachng Agency publicly opens and reads the bids Award Date The date of the formal dec�sion of the Contracring Agency to accept the lowest responsible and responsive b►dder for the work ContractExecution Date The date the Contracring Agency officially bmds the agency to the contract Notice to Proceed Date The date stated in the Norice to Proceed on wh�ch the contract bme begins Substantial Completion Date The day the Engineer determines the Contrachng Agency has full and unrestncted use and benefit of the faciliries, both fi the operational and safety standpoint, and only minor inc�dental work, replacement of temporary substrtute facilines, or correchon or repair remams for the phys►cal compleUon of the total contract Physical Completion Date The day all of the work is physically completed on the pro�ect All documentarion required by the contract and required by law does not necessanly need to be furmshed by the Contractor by this date Completion Date The day all the work specified �n the contract �s completed and all the obligat�ons of the Contractor under the contract are fulfilled by the Contractor All documentarion required by the contract and required by law must be furmshed by the Contractor before establishment of this date Final Acceptance Date The date on wh�ch the Con�acting Agency accepts the work as complete Department, Department of Transportation Subsritute the follo�nnng The words "Department" or "Department of Transportabon" shall mean the C�ty of Bremerton, Department of Public Works and Uril�t�es, 3027 Olympus Drive, Bremerton, Wash�ngton, 98310 Engineer Subsritute the followmg The word "Eng�neer" shall mean the City of Bremerton Crty Engineer and his/her authonzed representahves Force Account Work Additional work that may be required because of Crty-d�rected changes in the work, differing srte condiUons, emergencies or other reasons that the Engmeer determmes is not included in the Contract umt pr�ces, and for which payment is to be determined as requ�red by Sechons 1-04 and 1-09 of th�s Contract Force Account Work shall be authonzed only by written Work Change D�recdve issued by the Engmeer '� � r I� i� i I� , ��� I �� C � � a � ' ' � ' ' Ctty of Bremerton March 20/3 ' Eastsuie Beach Marn Replacement SP - 8 ' � ' ' LJ , ' ��J ' ' ' ' ' , � ' , , Imported Material Matenals obtamed from sources outside the pro�ect srte that are not furnished by the C�ty Matenais excavated from anywhere on the pro�ect or from designated borrow areas, or that are furmshed by the C�ty, shall not be considered imported matenal Laboratory Delete th�s defin�hon and subsritute the followmg The word "Laboratory" shall mean the official laboratones of the C�ty of Bremerton, or other laboratones the City of Bremerton authonzes to test work, soils, and matenals Notice of Award The wntten norice from the Contrachng Agency to the successful b�dder sigmfying the Contrachng Agency's acceptance of the bid Notice to Proceed The wntten norice from the Contrachng Agency or Engineer to the Contractor authorizmg and directzng the Contractor to proceed with the work and establishing the date on wh�ch the contract Ume begins Owner The City of Bremerton, Department of Public Works and UtiliUes, 3027 Olympus Dnve, Bremerton, Wash�ngton, 98310 achng through rts legally consbtuted officials, agents, officers, or employees, �s responsible for the execurion and admimstraUon of the Contract. Plans Add the follo`nnng Plans consist of drawmg sheets ritled "Easts�de Beach Main Replacement", dated March 2013, mcluded in Appendix F titled `Contract Plans' Provide The word "provide" shall be understood to mean "furmsh and mstall, complete in-place " Secretary, Secretary of Transportation Subshtute the following All reference to the words "Secretary" or "Secretary of Transportanon" shall mean the Crty of Bremerton Crty Council, Mayor or their authorized representarives State Subshtute the following The word "State" shall mean the C�ty of Bremerton Department of Public Works and Uhl�ties, 3027 Olympus Drive, Bremerton, Washmgton, 98310 When m reference to a State law or code, "State" shall remain m effect Traffic Both vehicular and non-vehicular traffic, such as pedestrians, b�cycl�sts, wheelchairs, and equestrian traffic Work Change Directive A written order issued by the Engineer directmg a change in the design, specificarions, quant►t�es, mater�als or methods of the work A Work Change Direchve may, or may not, alter the Contract Price or Contract T�me ' C:ty of Bremerton Eastsuie Beach Ma:n Replacement March 2013 SP-9 L_J � , 1-02 BID PROCEDURES AND CONDITIONS 1-02.1 Prequalification of Bidders Qanuary 24, 2011 APWA GSP) Delete thrs Sect�on and replace it w�th the following Before award of a public works contract, a b�dder must meet at least the mimmum qual�ficat�ons of RCW 39 04 350(1) to be considered a responsible bidder and qualified to be awarded a public works pro�ect 1-02.2 �*****� Plans and Specifications Delete th►s section and replace �t wrth the followmg Informarion as to where Bid Documents can be obtained or reviewed can be found in the Noncmg Inv�ttng Bids After award of the contract, plans and specificarions will be issued to the Contractor at no cost as detailed below To Prime Contractor No. of Sets Basis of Distribuhon Reduced plans (11" x 17") 5 Furnished automatically upon award Contract Provisions 5 Furnished automahcally upon award Large plans (e g, 22" x 34") 2 Furnished only upon request Addihonal plans and Contract Provisions may be obtamed by the Contractor from the source stated �n the Norice Inviring Bids 1-02.5 Proposal Forms Qune 27, 2011 APWA GSP) Delete this section and replace �t with the following The Proposal Form will identify the pro�ect and �ts location and descr�be the work It will also list esnmated quantihes, umts of ineasurement, the items of work, and the materials to be furmshed at the umt bid pr�ces The bidder shall complete spaces on the proposal form that call for, but are not l�m�ted to, unit prices, extens�ons, summarions, the total bid amount, s�gnatures, date, and, where applicable, retail sales taxes and aclrnowledgment of addenda, the bidder's name, address, telephone number, and signature, the bidder's D/M/WBE comm�tment, �f appl�cable, a State of Wash�ngton Contractor's Registration Number, and a Bus�ness License Number, �f applicable Bids shall be completed by typing or C:ty of Bremerton Eastsrde Beach Marn Replacement March 2013 SP-10 , , � , '�� , , �J � LJ O 1 I� ,� � ' ' , ' CJ � � ' 1 ' , ' , ' ' shall be pnnted in ink by hand, preferably �n black ink The requ�red cerhficarions are included as part of the Proposal Form The Contracnng Agency reserves the right to arrange the proposal forms w�th alternates and addirives, if such be to the advantage of the Contracring Agency The b�dder shall bid on all alternates and addirives set forth in the Proposal Form unless otherwise spec�fied 1-02 6 Preparat�on of Proposal Qune 27, 2011 APWA GSP) Supplement the second paragraph w�th the following 4 If a minimum bid amount has been established for any item, the unrt or lump sum pr�ce must equal or exceed the m�nimum amount stated 5 Any correct�on to a bid made by interlinearion, alteration, or erasure, shall be init�aled by the signer of the b�d Delete the last paragraph, and replace ►t wrth the followrng The Bidder shall make no shpularion on the B�d Form, nor qualify the bid in any manner A b�d by a corporation shall be executed in the corporate name, by the president or a vice president (or other corporate officer accompamed by evidence of authorrty to s�gn) A bid by a partnership shall be executed in the partnership name, and signed by a partner A copy of the partnersh�p agreement shall be subm�tted wrth the Bid Form if any D/M/WBE requ�rements are to be satisfied through such an agreement ' A b�d by a�oint venture shall be executed in the �oint venture name and be signed by a member of the �oint venture A copy of the �o�nt venture agreement shall be submitted w�th the Bid Form if any D/W/MBE requirements are to be sarisfied through such an agreement � ' � ' 1 ' A bid by a limited liability company shall be executed in the lim�ted liability company name and be s�gned by a member, accompanied by the enclosed Cernficate of Authorrty to sign, and his/her ntle must appear under the signature and the official address of the �omt venture must appear below the signature 1 Bid Deposit (October 1, 2005 APWA GSP) Supplement th►s sect�on with the following Bid bonds shall contain the following 1 Contracnng Agency-assigned number for the pro�ect, 2 Name of the pro�ect, 3 The Contracring Agency named as obl�gee, 4 The amount of the bid bond stated either as a dollar figure or as a percentage which represents five percent of the maximum b�d amount that could be awarded, ' Ctty of Bremerton Easurde Beach Matn Replacement March 2013 SP-11 ' � 6 Signature of the bidder's off�cer empowered to sign official statements The signature of the person authorized to submit the bid should agree �nnth the signature on the bond, and the t�tle of the person must accompany the said signature, The signature of the surety's officer empowered to sign the bond and the power of attorney If so stated in the Contract Provisions, bidder must use the bond form included in the Contract Provis�ons 1-02.8 �*****� Non-Collus�on Declaration Supplement this sectton with the follow�ng As a cond�non precedent to award of the Contract for th�s work, the successful bidder shall file a sworn statement executed by, or on behalf of, the person, associarion, or corporarion that he (they) has (have) not erther directly or indirectly, entered into any agreement, pardc�pated m any collusion, or otherwise taken any acdon in restraint of free comperirive b�dding m connechon wnth such Contract Th�s sworn statement shall be �n the form of an affidavrt executed and sworn to be the successful bidder before a person who is authonzed by the Laws of this State to admm�ster oaths The or�ginal of such sworn statement shall be filed with the C�ty Clerk, Crty of Bremerton, pr�or to the award of the contrac�t. The Non-Collusion Affidav�t �nnll be a part of the B�d Proposal By sigmng this proposal, the b►dder v►nll be deemed to have signed and agreed to the provisions of the Non-Collusion Affidavit 1-02 9 �*****� Del�very of Proposal Delete th�s sect�on and replace with the following Each proposal shall be submitted only on the blank forms bound m this document, and submitted m a sealed envelope marked clearly `nnth the pro�ect name Bid packet submitted shall mclude all bid forms listed in the Bidder Checklist in Part 1 1-02.13 Irregular Proposals (March 13, 2012 APWA GSP) Revise item 1 to read 1 A proposal will be cons�dered irregular and will be re�ected �f a The Bidder is not prequaltfied when so required. b The authonzed proposal form furmshed by the Contrachng Agency �s not used or is altered, c The completed proposal form contains any unauthor�zed addirions, deletions, alternate Bids, or conditions, d The Bidder adds provisions reserving the right to re�ect or accept the award, or enter into the Contract, e A prtce per umt cannot be determ�ned from the Bid Proposal, C:ty ofBremerton Eastsrde Beach Marn Replacement March 2013 SP-12 � � , ' i � � ' ' , � a ' ' � ' � 1 � ' 1 � ' h � � ' � , ' ' 1 � ' 1 � � � The Proposal form is not properly executed, The Bidder fails to subm�t or properly complete a Subcontractor list, if applicable, as required in Sect�on 1-02 6, The Bidder fails to submit or properly complete a Disadvantaged, M�nority or Women's Bus�ness Enterpr�se Certaficat�on, if applicable, as required in Section 1-02 6, The Bidder fails to submit written confirmanon from each DBE firm listed on the Bidder's completed DBE Unlizanon Cerhficanon that they are in agreement with the bidders DBE parricipanon comm�tment, �f applicable, as required in Section 1-02 6, or if the written confirmat�on that �s subm�tted fails to meet the requirements of the Special Provisions, f g The Bidder fails to subm�t DBE Good Faith Effort documentation, if applicable, as required �n Secrion 1-02 6, or if the documentarion that �s submitted fails to demonstrate that a Good Fa�th Effort to meet the Cond�tion of Award was made, The Bid Proposal does not consntute a definite and unqualified offer to meet the material terms of the B�d mv�tat�on, or u� - �,, .�• � ��� . ,u �-. � _�- ,��- � . • , �n , '• �.• _,•• ,_- .u- � ! �• •i �,i�- Disqualificahon of Bidders k 1 1-02.14 �*****� Delete this Sect�on and replace ►t w�th the follow�ng A Bidder will be deemed not responsible if 1 The Bidder does not meet the mandatory bidder responsibility criterta in RCW 39 04 350(1), as amended, or 2 evidence of collusion exists �nnth any other Bidder or potennal Bidder Panc�ipants in collusion v�nll be restr�cted from submithng further b�ds, or 3 the Bidder, in the opinion of the Contracnng Agency, is not qualified for the work or to the full extent of the bid, or to the extent that the bid exceeds the authorized prequalificanon amount as may have been determined by a prequal�ficat�on of the Bidder, or 4 an unsansfactory performance record exists based on past or current Contrachng Agency work or for work done for others, as �udged from the standpoint of conduct of the work, workmanship, or progress, aff'irmatave acrion, equal employment opportumty practices, termination for cause, or Disadvantaged Business Enterpnse, Minor�ty Business Enterpnse, or Women's Bus�ness Enterpnse ut�lizarion, or 5 there is uncompleted work (Contracting Agency or otherwise), which in the opmion of the Contrachng Agency m�ght h�nder or prevent the prompt complenon of the work b�d upon, or 6 the Bidder failed to settle bills for labor or mater�als on past or current contracts, unless there are extenuating circumstances acceptable to the Contrachng Agency, or 7 the Bidder has failed to complete a wrrtten public contract or has been convicted of a crime arising from a prev�ous publ�c contract, unless there are extenuating circumstances acceptable to the Contrachng Agency, or ' Cety of Bremerton Easts:de Beach Maan Replacement March 2013 SP-13 ' � 8 the Bidder �s unable, financially or otherwise, to perform the work, in the opinion of the Contractmg Agency, or 9 there are any other reasons deemed proper by the Contrachng Agency As ev�dence that the Bidder meets the b�dder respons�bil�ty cr�teria above, the apparent two lowest Bidders may be required to submrt to the Contrachng Agency withm 24 hours of the bid submittal deadline, documentarion (sufficient m the sole �udgment of the Contrachng Agency) demonstraring compliance �nnth all appl�cable responsibility critena, mcludmg all documentahon specifically listed in the supplemental cnteria The Contract�ng Agency reserves the r�ght to request such documentahon from other B�dders as well, and to request further documentanon as needed to assess bidder responsibility The basis for evaluation of Bidder compliance `nnth these supplemental cr�ter�a shall be any documents or facts obtamed by Contrachng Agency (whether from the Bidder or third parhes) which any reasonable owner would rely on for determ�mng such compliance, mcluding but not limrted to (i) financial, historical, or operarional data from the B�dder, (n) information obtained directly by the Contracbng Agency from owners for whom the B�dder has worked, or other public agencies or private enterpr�ses, and (iii) any addibonal informahon obtained by the Contracting Agency which is bel�eved to be relevant to the matter If the Contrachng Agency determines the B�dder does not meet the bidder responsibilrty crrtena above and is therefore not a responsible Bidder, the Contrachng Agency shall nohfy the Bidder �n wnhng, w�th the reasons for its determinat�on If the B�dder d�sagrees with this determinahon, �t may appeal the determ�narion within 24 hours of receipt of the Contracting Agency's determinarion by presenhng �ts appeal to the Contrachng Agency The Contrachng Agency wnll consider the appeal before issumg its final determmahon If the final determinahon affirms that the B�dder �s not responsible, the Contrachng Agency will not execute a contract with any other Bidder unnl at least two business days after the B�dder determined to be not responsible has received the final determinarion 1-02.15 Pre Award Information (October 1, 2005 APWA GSP) Revise this sect�on to read Before awardmg any contract, the Contrachng Agency may require one or more of these �tems or acUons of the apparent lowest responsible b�dder 1 A complete statement of the ongm, composition, and manufacture of any ar all materials to be used, 2 Samples of these matenals for quahty and fitness tests, 3 A progress schedule (m a form the Contrachng Agency requires) sho�nnng the order of and Ume required for the var�ous phases of the work, 4 A breakdown of costs ass�gned to any b�d �tem, 5 Attendance at a conference with the Engmeer or representarives of the Eng►neer, 6 Obtain, and furmsh a copy of, a busmess license to do busmess in the crty or county where the work �s located 7 A copy of State of Wash�ngton Contractor's Registrat�on, or 8 Any other �nformarion or action taken that �s deemed necessary to ensure that the b�dder is the Iowest responsible bidder � � � ' ' ' � l�J � � � 1 � � � 1 C�ty ofBremerton March 2013 ' Eas/stde Beach Mam Replacement SP -14 1 � � 1-02.16 Addenda and Interpretaaons of Documents (NEW SECTION) � �*****� No oral interpretahon of the meamng of the plans, specificahons or other pre-bid documents `nnll be made to � any bidder Every request for such interpretahon shall be submitted m wriring, addressed to the cit}�s contact person (hsted on the cover page of these contract documents), and to be grven cons�deration, shall be received at least three (3) worlang days pnor to date fixed for Bid Opemng Any and all such interpretabons and supplemental �nstruct�ons �nnll be m the form of wntten addenda to the Spec�ficaUons which, �f issued, � �nnll be mailed or otherwise delivered to each prospechve bidder Failure of any bidder to recerve any such addendum shall not reheve such b�dder from any obhganon under his bid as submitted All addenda so �ssued shall become a part of the Contract documents � 1-03 � � f � �� AWARD AND EXECUTION OF CONTRACT 1-03.1 Cons�deration of Bids Qanuary 23, 2006 APWA GSP) Revise the first paragraph to read After opening and reading proposals, the Contracting Agency will check them for correctness of extens�ons of the prices per un�t and the total price If a discrepancy exists between the price per unit and the extended amount of any bid �tem, the pr�ce per unrt �nnll control If a mimmum bid amount has been established for any rtem and the bidder's umt or lump sum price is less than the mimmum specified amount, the Contrachng Agency will umlaterally revise the unit or lump sum price, to the mmimum specified amount and recalculate the extension The total of extensions, corrected where necessary, �nclud�ng sales taxes where applicable and such addit�ves and/or alternates as selected by the Contracnng Agency, will be used by the Contracring Agency for award purposes and to fix the Awarded Contract Pr�ce amount and the amount of the contract bond 1-03.2 � �*****� � � � Award of Contract Supplement thls section with the following Th�s contract �s cond�taoned on the City receiving a Hydraul�c Pro�ect Approval (HPA) from the Washington Department of Fish and Wildlife, and Nataomnnde Permrt #12 from the Umted States Army Corp of Engineers that permrts the pro�ect as specified �n the contract Therefore, the C�ty �nnll not award the contract unbl these perm�ts have been issued by the respechve agencies The Crty anric�pates receipt of the permits �n late Apr�l or early May The Crty reserves the r�ght to `nnthhold award of the contract and cancel all bids for whatever reason � 1-03 3 �*****� � Execution of Contract Delete this section and replace w►th the following The City �nnll mail three copies of the contract to the successful Bidder immediately after award Wrthin bQ �� C:ry of Bremerton Easts�de Beach Ma:n Replacement March 2013 SP-IS � calendar days from receipt of the contracts, the successful bidder shall return 3 signed or�ginal contracts, msurance cerhficates as requ�red by Secdon 1-03 8, and a sahsfactory bond as requ�red by law and Secrion 1- 03 4 of these Contract Documents Before execuhon of the contract by the City, the successful bidder shall provide any pre-award information the City may require under Sechon 1-0215 Unril the C�ty executes a contract, no proposal shall bind the Crty nor shall any work begin v�nthin the pro�ect lim�ts or wrthin C�ty-furnished s�tes The Contractor shall bear all nsks for any work begun outside such areas and for any materials ordered before the contract is executed by the City If the bidder's performance of the requirements of this Sechon is delayed by circumstances beyond the biddefs control, the Crty may grant up to 20 calendar days of addinonal Ume, provided that the C►ty agrees that circumstances warrant an extension 1-03.4 �*****� Contract Bond Delete th►s section and replace with the follow►ng The successful bidder shall provide executed contract bonds �n the form of a Performance Bond and a separate Payment Bond, each for the full contract amount The Performance Bond bond shall 1 Be on a Contrachng Agency-furnished form, 2 Be s�gned by an approved surety (or sureries) that a Is registered v�nth the Washmgton State Insurance Comm�ssioner, and b Appears on the current Authonzed Insurance List m the State of Wash�ngton published by the Office of the Insurance Commiss�oner, 3 Be cond�boned upon the faithful performance of the contract by the Contractor `nnthm the prescribed rime, 4 Guarantee that the surety shall mdemmfy, defend, and protect the Contrachng Agency against any claim of direct or mdirect loss resulring from the failure of the Contractor (or any of the employees, subcontractors, or lower t►er subcontractors of the Contractor) to faithfully perform the contract 5 Be accomnamed by a nower of attorney for the Suretds officer empowered to sign the bond. and be signed by an officer of the Contractor emnowered to sign official statements (sole �ronrietor or nartner). If the Contractor is a corporat�on. the bond must be signed by the �resident or v�ce- gresident. unless accomnamed by wntten nroof of the authoritv of the �nd�v►dual sigmng the bond to bind the cornorat�on (i.e.. cor�orate resoluhon. nower of attorney or a letter to such effect by the president or vice-�residentl. The Payment Bond shall 1 Be on a Contractmg Agency-furnished form, 2 Be signed by an approved surety (or suret�es) that a Is registered �nnth the Washington State Insurance Commissioner, and b Appears on the current Author�zed Insurance List in the State of Wash�ngton published by the Office of the Insurance Commissioner, c Guarantee that the surety shall indemnify, defend, and protect the Contractmg Agency against any cla�m of direct or mdirect loss resulbng from the failure of the Contractor [or the subcontractors or lower t�er subcontractors of the Contractor) to pay all laborers, mechamcs, subcontractors, lower rier subcontractors, matenal person, or any other person who provides supplies or provisions for carry�ng out the work, 3 Be accomaanted by a uower of attorney for the Suretds officer em,�owered to si�n the bond. and 4 Be signed by an officer of the Gontractor empowered to sien official s�tements (sole �ro�netor or City of Bremerton March 20/3 Eastside Beach Matn Replacement SP -! 6 � � � � � l�J �artr�er). If the Contractor is a cotrooranon. the bond must be signed by the pres�dent or v�ce- preS�dPnr unlPSS accomnamed by wrrtten p�oof of the authoritv of the individual sig�g the bond to bind the cornorahon (i•e•• cornorate resolution. Fower of attorney or a letter to sLCh effect by th_e �resident or vice-�residentl. Supplement with the followrng text The Performance Bond for th�s pro�ect shall remam in full force and effect for a penod of one (1) year followmg acceptance by the Crty The bond shall be executed by a surety company authonzed to do business �nnthin the State of Washmgton and shall be sub�ect to the approval of the City � 1-03.7 , �*****� Judicial Review Delete all occurrences of "Thurston County" ►n thrs section and replace with "Kitsap County" � � .I � �� � 1 � � SCOPE OF WORK 1-04 1-04.2 Coordanaaon of Contract Documents, Plans, Special Provisions (March 13, 2012 APWA GSP) Revise the second paragraph to read Any �nconsistency in the parts of the contract shall be resolved by follownng th�s order of precedence (e g, 1 presiding over 2, 2 over 3, 3 over 4, and so forth) Addenda, Proposal Form, Spec�al Provisions, Contract Plans, Amendments to the Standard Specificarions, Standard SpecificaUons, Contracting Agency's Standard Plans or Deta�ls (if any), and WSDOT Standard Plans for Road, Bndge, and Mumc�pal Construchon 1 2 3 4 5 6 7 8 � 1 � LJ � Phased Notice to Proceed (NEW SECTION) Two (2) separate not�ces to proceed will be issued These are • Nohce to Proceed Phase 1 • Nohce to Proceed Phase 2 Nodce to Proceed Phase 1 �nnll be issued �mmediately after execunon of the Contrac�t. This Nonce to Proceed shall conshtute approval to begm material procurement (upon submittal approval), mobilizanon, construchon of the beach access road and any other work in upland areas Issuance of Nohce to Proceed Phase 2 conshtutes approval to begin work on the beach in accordance wrth permit requirements � C�ty of Bremerton Easlsute Beach Ma:n Replacement March 2013 SP-17 , 1-05 1-05.3 �*****� CONTROL OF WORK Plans and Working Drav�nngs Supplement th�s section with the following ;._ �;� �;-- � ��� Prior to acceptance of the completed pro�ect, the Contractor shall furmsh the Engineer one legible and neatly marked set of full-sized Plans showing any changes �n location, elevation, or configurat�on of the pipelines and appurtenant valves and fithngs, access roads, manholes, catch basins, srte work, and other perhnent rtems These Plans shall be kept current during the course of construcnon, kept on site at the Contractor's s►te office, and be available for review by the Engmeer at all t�mes The Contractor is not respons�ble to complete record dra�nnngs in electronic format (e g AutoCAD) Record dra�nnngs shall be updated da�ly and changes occurring on any day shall be entered on the record drawings by noon on the next worinng day The Contractor and the Eng�neer shall review the record dra�nnngs weekly A pay submittal shall not be consadered complete or payable ef the record drawings are not current as required by this session. No measurement or payment w�ll be made to complete record drawings Record draw�ngs shall be considered incidental to other bid items 1-05.4 �*****� Conformity with and Deviations from Plans and Stakes Supplement this sect�on with the following The Crty has establ�shed honzontal and venc�al control points and �dentzfied these on the Contract Plans Copies of the Crty-provided pnmary survey control data are available for the bidder's inspection at the office of the Pro�ect Engineer The City �nnll provide the electromc AutoCAD drawmgs v�nth control po�nts and al�gnment to the Contractor upon request for use in stalang the alignment The Contractor is responsible for all survey work. If the plans, Standard Specifications, or these Special Provisions state spec�fic tolerances, the work shall be performed �nnthin those limrts The Eng�neer's dec�sion on whether the work is m conform�ty shall be final, as provided in Sechon 1-051 The Contractor shall not deviate from the approved plans and worlang drawings unless the Engmeer approves in wriring The Contractor shall be respons�ble for semng and mamtaining all ahgnment stakes, slope stakes, and grades necessary for the construchon of the proposed uhlity and appurtenances, surfacing, paving, channel�zation, and other surve}nng necessary to complete the work as shown m the Plans and specified in the contr Except for the survey control data provided by the City, calculat�ons, survey�ng, and measur�ng required for sethng and mainta�mng the necessary lines and grades shall be the Contractor's responsibilrty The Contractor will provide the City copies of such calculaUons and stalang data when required by the Engineer Any stalang requirements for the pro�ect that do not fit field condirions �nnll be reviewed and �f necessary ad�usted by the Eng�neer Any necessary revision to the stalang mformarion will be prov�ded to the Cety of Bremerton March 2013 Easts:de Beach Mam Replacement SP -18 � r �_ � � � LJ l� L�1 � � � � �� L__S Contractor for use in completing the work The survey work shall include but not be limrted to the followmg 1 Venfy the pnmary hor�zontal and venc�al control furnished by the Contrachng Agency, and expand mto secondary control by addmg stakes and hubs as well as addirional survey control needed for the pro�ect Prov�de descnptions of secondary control to the Contrachng Agency 2 Establish the centerlines of all alignments, by placmg hubs, stakes, or marks on centerlme or on offsets to centerline at points on the alignments spaced no further than 75 feet and 50 feet through curves 3 Establ�sh intermediate elevabon benchmarks as needed to check work throughout the pro�ec�t. 4 For all other types of construcrion included �n this provis�on, provide stalang and layout as necessary to adequately locate, construct, and check the specific construchon achv�ty The Contractor shall ensure a surve}nng accuracy �nnthm the follov�nng tolerances Stariomng Alignment Drainage/Pipehnes +/- 0 01 foot +/- 0 01 foot alignment +/- 0 1 foot elevahon +/- 0 01 foot At the Crty's discrerion, �t may spot check the Contractor's surveying These spot checks v►nll not change the requirements for normal checkmg and tesUng as described elsewhere, and do not relieve the Con� of the responsibility of producing a fimshed product that is m accordance with the contract In all disputes concermng accuracy of lmes and elevabons, the Crty shall be assumed correct and the Contractor shall correct the discrepancies before construchon work may proceed No additional compensaUon will be paid for th�s correchve work. Detailed survey records shall be mamta�ned, mcluding a descnphon of the work performed on each shift, the methods unlized, and the con� points used The record shall be adequate to allow the survey to be reproduced Construcrion Survey Subm�ttals A. GPS or survey data for the newly mstalled pipelme along centerline, valves, fithngs, bends, air valves, and other appurtenances GPS accuracy shall be subcenhmeter No measurement or payment vvill be made for surveymg or l�censed surveymg Surveymg and licensed surveymg shall be considered mcidental to other bid �tems � 1-05.5 �*****� �' 1-05 5(1) Submittals (NEW SECTION) General f � Submrttals covered by these requirements �nclude manufacturers' informaUon, Shop Dra�nnngs, test � procedures, test results, samples, requests for subsntut�ons, m�scellaneous work-related submittals, and � records of survey for monument reset Subm�ttals shall also �nclude, but not be hmrted to, all mechamcal, electncal and electronic equipment and systems, materials, reinforcing steel, fabricated items, schedules, � Crry of Bremerton Easu:de Beach Ma:n Replacement March 2013 SP-19 „ � plans, pipmg and condurt details, and all other subm►ttals spec�fically listed elsewhere in the Contract Documents The Contractor shall furnish all drawmgs, specificat�ons, descripnve data, cerdficates, samples, tests, methods, schedules, and manufacturer's installabon and other �nstrucbons as specifically requ�red in the Contract Documents to demonstrate fully that the matenals and equipment to be furmshed and the methods of work comply w�th the provisions and intent of the Contract Documents 1-05.5(2) Contractor's Responsibdities The Contractor shall be responsible for the accuracy and completeness of the informaUon contamed m each submittal and shall assure that the mater�al, equipment, or method of work shall be as descnbed m the submittal The Contractor shall ver�fy that all features of all products conform to the specified requirements Submittal documents shall be clearly ed►ted to md►cate only those rtems, models, or ser►es of equipment, which are being submitted for review All extraneous matenals shall be crossed out or otherwise oblrterated The Contractor shall ensure that there is no conflict `nnth other submritals and noUfy the Crty in each case where his submrttal may affect the work of another contractor or the City The Contractor shall completely coordinate submrttals among his subcon� and suppliers mcludmg those submittals compl}nng �nnth applicable technical sections The Contractor shall coordinate submittals �nnth the work so that work will not be delayed The Contractor shall coordinate and schedule d�fferent categor�es of submrttals, so that one �nnll not be delayed for lack of coord�narion �nnth another No extension of time �nnll be allowed because of failure to properly coordinate, schedule or provide complete submritals, or not allowmg for sufficient review and processing rime by the C�ty The Contractor shall not proceed �nnth any porhon of work related to a subm�ttal until 1 The submrttal process is complete, 2 Contractor has obtamed from the City a subm�ttal marked "No ExcepUons Taken", "Make Corrections Noted" or "Product Data/Not Reviewed" The Contractor shall cernfy on each submittal document that he has reviewed the subm�ttal, venfied field condirions, and complied v�nth the Contract Documents by s�gnmg and daring the submrttal transmittal form The Contractor may author�ze in wnring a material or equ�pment supplier to deal directly `nnth the Crty �nnth regard to a submrttal These deal�ngs shall be limrted to contract mterpretarions to clarify and exped�te the work In such cases, the Contractor �s not absolved from h�s responsibiliries defined herein 1 Request for Substitution or Deviaaon Whenever matenals or equ�pment are indicated �n the Contract Documents by using the name of a propnetary �tem or the name of a panc�ular Supplier, the nammg of the rtem or supplier is mtended to establ�sh the type, funcrion, and quality required Unless expressly stated otherwise, matenals or equ�pment of other suppliers may be accepted �f sufficient informataon is subm�tted by the CONTRACTOR to allow the ENGINEER to determine that the matenal or equipment proposed is equivalent or equal to that named The Contractor shall bear all actual costs incurred by the Crty associated v�nth review of a proposed subst�turion or deviat�on regardless of whether the subsbtut�on or deviarion is ulrimately approved by the Crty Requests for subsrituUon or deviation for other equipment or matenal shall be in writ�ng and shall be accompamed �nnth sufficient informat�on to permrt the C�ty to ►dentify the nature and scope of the request Informarion to be provided along with the request shall include 1 All submittal informaUon required for the specified equipment, mcluding all deviarions from the specified requirements necessrtated by the proposed subsritunon Crty of Bremerton March 2013 Eastsrde Beach Marn Replacement SP - 20 � � �� � � � �' '�; 2 Matenals of construchon, includmg material specificabons and references 3 Performance data, including performance curves and guaranteed power consumphon, over the range of specified operahng condihons 4 D�mens�onal dra�nnngs, sho�nnng required access and clearances, mcluding any changes to the work required to accommodate the proposed subsUturion or deviation 5 Where controls are a part of the proposed subsritut�on or dev�ahon, piping, process and instrumentarion draw►ngs (PIDs), produced m the pro�ect format and �nnth pro�ect-specific symbols, along w�th control descriprions 6 Where controls spec�fied in the pro�ect manual require modificarion to accommodate the proposed subst�tubon or deviarion, piping, process and �nstrumentanon drav�nngs (PIDs), produced m pro�ect format and wrth pro�ect-specific symbols, w�th all required modificat�ons clearly highhghted 7 Informat�on and performance charactensrics for all system components and ancillary devices to be fizrnished as a part of the proposed subsUtuUon or dev�arion 8 Reproduc�ble contract dra�nnngs, marked up to illustrate the alterarions to all structural, arch►tectural, mechamcal, electrical, and HVAC systems required to accommodate the proposed subsbtubon or deviahon 9 A l�st of installahons of the proposed subsrituhon or dev�abon ind�caUng applicabon, locarion, owner and date of first use � Upon receipt of written apphcahon for subst�turion or deviat�on from the Contractor, including the mformarion specified above, the City �nnll estimate the cost of evaluaring the request and present the esbmate to the Contractor The Contractor is advised that the esrimate is based upon the best informarion available to � the C�ty at the time, however, the actual cost, based on hme and expense, `nnll be documented and applied m the final analysis of the subst�turion or dev�abon request If the Contractor �nnshes to proceed with the request, he shall advise the C�ty in wr�Ung and submrt sufficient add�nonal mformarion as may be requested by the Crty No evaluanon will take place unt�l such rime as the Contractor has agreed to the est�mate m � wnbng and has authonzed the Crty to deduct the actual cost of the evaluabon from monthly progress payments due the Contractor � � � �; � ,�, 1-05.5(4) Categories of Submittals Shop Dra�nnngs Per Sechon 1-061 Samples Per SecUon 1-061 Administrarive Submittals Submrttals that are not Shop Dra�nnngs or Samples, or that do not reflect qual�ty of product or method of construcrion May �nclude, but not be limrted to 1 Applicarions for payment 2 Construchon photographs 3 Progress reports 4 Progress schedules 5 Schedule of values 6 Schedule of esrimated progress payments 7 Traimng matenals 8 Traming schedules �� C:ty ojBremerton Easlsute Beach Marn Replacement March 2013 SP-21 1 l+ �. 9 Submrttals required by laws, regulahons, and governing agenc�es Qual�ty Control Subm�ttals May mclude, but not be limrted to 1 Manufacturer's instruchons 2 Cerhficates/Cerhficat�ons a Manufacturer's b [nspection c Govermng Agenc�s 3 Manufacturer s field service reports 4 Manufacturer's test reports 5 Operation and mamtenance data 6 Operation and maintenance manuals 7 Qual�ty control plan 8 Reports (inspechon and test) 9 Statements of qualificahons 10 Test specimens Submittals (Product Data) for Informanon Only Required Subm�ttals (Product Data) for Informahon Only are not sub�ect to submrttal retnew procedures and shall be prov�ded where specified as part of the work under this contract and rts acceptabilrty determined under normal mspection procedures 1-05.5(5) Submittal Transmittal Procedure When the Contract Documents requ�re a subm�ttal, the Contractor shall submit the specified �nformarion to the designated City representatave via e-mail m Adobe PDF format Unless otherwise specified, submrttals shall be accornpamed by transmittal forms to be prov�ded by City A separate form shall be used for each specific rtem, class of matenal, equipment, and �tems specified m separate, discrete sechons, for which the submittal is requ�red The form shall be signed by the Contractor's review or authonzed representative Submrttal documents common to more than one piece of equipment shall be identified �nnth all the appropnate equipment numbers Submrttals for vanous rtems shall be made �nnth a single form when the �tems taken together consbtute a manufacturer's package or are so funchonally related that expediency �ndicates checlang or rev�ew of the group or package as a whole A umque number, sequenrially assigned, shall be noted on the transm�ttal form accompanying each item submitted Or►gmal submittal numbers shall have the follo�nnng format "XXX", where "XXX" is the sequent�al number assigned by the Contractor Resubmittals shall have the following format "X}IX-Y", where "X}IX" is the originally assigned submrttal number and "Y" �s a sequentral letter assigned for resubmittals, i e, A, B, or C bemg the is� 2nd, and 3rd resubmrttals, respecdvely Submittal 025-B, for example, is the second resubmittal of subm�ttal Q25 Submittals which are mcomplete and/or do not have all the mformat►on required to be submitted, includ�ng but not limrted to a signed and dated submrttal transmittal form, and copy of marked-up specifications and/or dra�nnngs when spec�fied , are not acceptable and �nnll be returned �nnthout rev�ew All submrttal informahon prov►ded by subcontractors shall be transmitted through the Contractor and shall bear the Cety ofBremerton March 20/3 Eastsrde Beach Matn Replacement sP - 22 � � ontractor's � ature C s gn ��� 1-05.5(6) Submittal Review Procedure � � � ,� ,� , � �� � � �' ;� �� � Unless othetw�se specified, �nnthin 14 calendar days after receipt of a submittal for review and comment, the City shall review the submrttal and return the rev�ewed copy with the transmrttal cover sheet via e-mail m Adobe PDF format 1 If the rev�ew mdicates that the matenal or equipment compl�es �nnth the proJect manual, subm�ttal copies will be marked "NO EXCEPTIONS TAKEN " In this event, the Contractor may begin to incorporate the matenal or equipment covered by the submrttal 2 If the review mdicates limrted corrections are required, cop�es v►nll be marked "MAKE CORRECTIONS NOTED " The Contractor may begin mcorporating the matenal and equipment covered by the subm�ttal �n accordance �nnth the noted correchons Where submittal informabon �nnll be incorporated in 0&M data, a corrected copy shall be provided 3 If the review reveals that the subm�ttal is msufficient or contains incorrect data, copies will be marked "AMEND AND RESUBMIT " Except at his own r�sk, the Contractor shall not undertake work covered by this submittal unhl rt has been revised, resubm�tted and returned marked either "NO EXCEPTIONS TAKEN" or "MAKE CORRECTIONS NOTED " 4 If the review md�cates that the matenal, equipment, or work method does not comply with the Contract Documents, cop�es of the submittal �nnll be marked "REJECTED - SEE REMARKS " Submittals �nnth deviarions which have not been idenrified clearly may be re�ected Except at his own nsk, the Contractor shall not undertake the work covered by such submrttals unril a new submrttal is made and returned marked e�ther "NO EXCEPTIONS TAKEN" or "MAKE CORRECTIONS NOTED " 5 If the review �nd�cates that the subm�ttal is Product Data or a Required Submittal (Product Data) for Informanon Only the submittal `nnll be marked "PRODUCT DATA/NOT REVIEWED Acceptabilrty of the matenal, equipment, or work shall be determmed under normal �nspecrion procedures 1-05.5(6)A Effect of Review of Contractor's Submittals Review of drav�nngs or mformarion regarding materials or equipment the Contractor proposes to prov�de, shall not relieve the Contractor of his responsibil�ty for errors there�n and shall not be regarded as an assumption of nsks or liabil�ty by the Crty, or by any delegated representat�ve, officer or employee thereof, and the Contractor shall have no claim under the contract on account of the failure, or partial failure, of mater�al, or equipment so reviewed A mark of "NO EXCEPTIONS TAI�N" or "MAKE CORRECTIONS NOTED" shall mean that the City has no ob�ecdon to the Contractor, upon his own responsibil�ty, using the plan or method of work proposed, or providmg the matenals or equ�pment proposed Approval of shop draw�ngs or other submittals by the City �s only for general conformance v►nth the design concept of the product and general compl�ance �nnth the Contract Documents Any achon required is sub�ect to the requ�rements of the Plans and Specificahons The Contractor is responsible for dimensions wh�ch shall be confirmed and correlated at the �ob srte, coord�nanon of h�s work vv�th that of all other trades, and the sat�sfactory performance of his work. i� 1-05.5(7) Required Submittals �� The Contractor shall provide the Crty all required submittals idenrified m the Special Provisions and Standard Specificabons Sechons, or shown on Contract Plans, which shall mclude, but not be limrted to �� Crty of Bremerton Eastsrde Beach Ma:n Replacement March 2013 SP-23 � 1-05.5(7)A Submittals for the Pre-construction Conference The follo�nnng rtems shall be submitted at the pre-construchon conference pnor to the Notice to Proceed For each ►tem, submrt 3 hard cop�es and an electromc copy on a CD-ROM disk. 1. Gon�actor's �d S�bcontracto_r's Gontact Informatzon - Names and 24-hour contact telephone numbers of contractor's and each subcontractor's key personnel identified m Standard Specificarions Section 1-0513 Electron�c copy shall be m MS Word 2. Contractors Labor Classifiicat�ons and Rates. Classificanon of all workers to be employed by the Contractor and rts subcontractors m the work, excluding the Contractor's Supenntendent and General Foremen (if any), and, straight-t�me and overhme Weighted Wage Rates for each subm�tted labor classificarion, computed as required in Standard Specificanon Sechon 1-09 6 Update and resubmrt the enhre labor class�ficaUon file whenever worker classificat�ons are changed, added or deleted Electronic copy shall be �n MS Excel 3. Gontractor's E��nment G1assLficabons and IZtPs Make and model of each rtem of equipment and small tools to be employed by the Contractor and rts subcontractors �n the work, and, worlang and standby (idle) hourly rates for each submitted rtem of equ�pment, computed as requ�red by Standard Specificahon Sechon 1-09 6 and the AGC/WSDOT Equipment Rental Rate Agreement referenced there�n Update and resubm�t this entire equipment classification file whenever equipment or small tools class�fications are changed, added or deleted Electronic copy shall be in MS Excel 4 Gontractor's Proeress Sched�e (Type Bl. Progress schedule �denrified in Special Provisions Secrion 1-08 3(2)A. Formatshall be Pr►mevera SureTrak or MS Pro�ect 5. Gost bre�kdown for l�tnn s�m itPms. if annlic?ble. � . y 1 1 1 I. �. e�S 1 .1 ..!.I' a Percentage value of work assigned b Prmc�pal contact(s) c Address d Telephone and fax numbers -- '1 ( . � ' !� _ '. Y. '. �, • • � �_ � �_ . � _!_ '. � �_ i�_ K 1 � ...1.! ' 1 ►. 1-05.5(7)B Construction Subm�ttals The follo�nnng rtems shall be submitted, as applicable, at least three weeks pnor to the associated construchon achvrty to allow ample hme for rev�ew and resubmrttal if necessary - Catalog mformataon and data sheets for all mater�als to be installed on pro�ect - Traming cerhficates for asbestos-abatement workers - Bypass Piping Plan - Connection Plans - Erosion Control Plans - Mobilizahon and Stagmg Plan - Temporary Traffic Control Plans - Certificahon for Traffic Control Supervisor (TCS) C:ty of Bremerton March 2013 Easts:de Beach Mam Replacement SP - 24 ��� I I� - Shor�ng Plans - Manufacturer's cerhficarion for trench boxes to be uttlized - Records of survey for monument reset - Any other construchon-related submittal identtfied elsewhere in ttie Contract Documents � �f � 1-05 5(7)C r � ,-� Addihonal Administrahve Submittals The follo�nnng administrat�ve submittals shall be submitted when noted - Retainage account mformation - Submit prior to first invoice � - Intent to Pay Preva�ling Wage Rates for prime contractor and subcontractors - Submtt pr►or to �ssuance of Notice to Proceed ' - Cerrified Payrolls -'Submit weekly � - Affidav�t of Wages Pa�d - Subm�t upon complehon of Work - Addirional submittals where �denhfied in the Contract Documents and as requested by the Engineer 1 Removal of Defective and Unauthorized Work (October 1, 2005 APWA GSP) Supplement this sect�on with the follow�ng �( If the Contractor fails to remedy defecrive or unauthor�zed work wrth�n the nme specified �n a wr�tten i; � nonce from the Engmeer, or fails to perform any part of the work required by the Contract Documents, �� the Engineer may correct and remedy such work as may be idennfied in the written norice, wrth Contracting Agency forces or by such other means as the Contracnng Agency may deem necessary I �� � i �� 1 l� � �� �� �� � � If the Contractor fails to comply with a written order to remedy what the Engineer determines to be an emergency situation, the Engineer may have the defective and unauthortzed work corrected immediately, have the re�ected work removed and replaced, or have work the Contractor refuses to perform completed by us�ng Contracting Agency or other forces An emergency s�tuanon �s any situabon when, �n the op�mon of the Engineer, a delay m its remedy could be potentially unsafe, or might cause senous nsk of loss or damage to the pubhc ' � Direct or �ndirect costs mcurred by the Contracting Agency attributable to correcring and remedying 'defective or unauthorized work, or work the Contractor failed or refused to perform, shall be paid by the Contractor Payment will be deducted by the Engineer from momes due, or to become due, the Contractor Such direct and indirect costs shall include in panc�ular, but wrthout limrtahon, compensarion for addrtional professional services required, and costs for repa�r and replacement of work of others destroyed or damaged by correct�on, removal, or replacement of the Contractor's unauthorized work � No ad�ustment in contract tame or compensarion will be allowed because of the delay �n the performance of the work attributable to the exercise of the Contracnng Agency's rights provided by th�s Secrion The r�ghts exercised under the provisions of this secnon shall not dimimsh the Contracting Agenc�s right to pursue any other avenue for add�tional remedy or damages �nnth respect to the Contractor's failure to perform the work as required ' � ; C:ry of Bremerton Easts�de Beach Marn Replacement March 2013 SP-25 �� 1� 1-07.16(2) Preconstrucdon Photographs (NEW SECTION) The Crty will take preconstruction photographs �mmediately prior to construction imtiarion �n order to prov�de a substanriated record of the cond�non of existmg improvement These photographs shall be cons�dered as �ndicative of the nature of the onginal improvements in determining the adequacy or madequacy of restorabon In add�non, the Contractor may also wish to document the exisnng condirions for themselves m the event of a claim situat�on from an ad�acent property owner 1-07.17 Uhlities and Similar Facilities �*****� Supplement th►s sect�on by ►nsert�ng the followmg new sections 1-07.17(3) Underground Utihtaes (NEW SECTION) Known util�ties and structures ad�acent to or encountered m the work are shown on the dra`nnngs The locahons shown are based upon ex�sring records and the best informat�on available from ex�snng ut►lity plans However, there may be some d�screpancies and omiss�ons �n the locabons and quanhnes of uriliUes and structures shown Those shown are for the convenience of the Contractor, and no responsibility is assumed by erther the City or the Engmeer for the accuracy of their locanon, existence or completeness No excavanon shall commence until underground fac�lrties have been located Contractor shall use reasonable care, including precisely locaring known underground factlit►es If an unidenrified underground facility is encountered, the excavator shall cease digging in the vic�nity and not�fy the Engineer, City and the affected facility owner In case there is damage, the excavator shall, addit�onally, take publ�c safety measures, if required Damaged underground facilities shall not be buned, relocated and/or repaired, prior to inspecrion by the Crty and the affected facilrty owner In accordance with and as defined by RCW 19122, emergency excavat�ons are exempt from the hme requirements "Emergency" includes customer service outage Provide temporary support for all exisring underground uril�ries when they are exposed and suspended �n the excavanon Reference Sechon 7-08 3(5) for requirements for potholing of exisring unlines 1-07.17(4) Contractor's Responsibilrty for Utility Properties & Services (NEW SECTION) Where the Contractor's operat�ons could cause damage or mconven�ence to railway, telegraph, telephone, television, power, oil, gas, water, sewer, storm sewer, or irriganon systems, operanons shall be suspended unt�l all arrangements necessary for the protecnon of these utilities and services have been made by the Contractor The Contractor shall protect, in place, all railway, telegraph, telephone (including poles, guy w�res and anchors), televis�on, power (�ncluding poles, guy wires, and anchors), oil, gas, water, sewer, storm sewer, or irr�ganon systems from damage If �nterfering railway, telegraph, telephone (including poles, guy Crry of Bremerton March 2013 Easurde Beach Marn Replacement SP - 32 � � �� ,� � � �' � � � � w►res, and anchors), television, power (mcluding poles, guy �nnres, and anchors), o�l, gas, water, sewer, storm sewer, or irrigat�on systems are encountered noUfy the Engineer and the appropriate unlity company at least two (2) worinng days �n advance of construchon operarions to permit the necessary arrangements for protecrion or relocat�on of the interfer�ng structure The Contractor shall pay all costs of protect�ng and/or relocarion of such facilit�es In the event of interruprion to domesnc water, sewer, storm drain, or other ut�l�ty services as a result on accidental breakage due to construction operahons, the Contractor shall promptly nohfy the proper authonty, cooperate wrth said author�ty in restoration of service as promptly as possible and bear all associated costs of repa�r sub�ect to determinahon of responsibilrty In no case shall �nterrupt�on of any water or utility service be allowed to ex�st outside worlang hours unless pnor approval is granted All costs of repairing uril►ries interrupted or uprooted, replacing dnveway and roadside culverts, fences, guard posts, landscape shrubs, traffic signs, and mailboxes shall be considered inc�dental In the event the Contractor encounters water and sewer service l�nes that mterfere with trenching or that must be relocated to avoid the new p�peline, the serv�ces may be cut, and the trench dug through, only after obtain�ng prior approval of the Water Department, Engmeering Department, or Fire Department, as applicable, and the Engineer All work and repa�rs to the water system shall be performed by C�ty forces only The services v�nll be restored with s�milar or equal materials The Contractor shall replace, at h�s own expense, any and all other exisring ut�lit�es or structures removed or damaged during construcrion, unless otherwise prov�ded for m these Contract Documents or ordered by the Engineer Exishng water mains are generally buried at 3' depth from the ground surface to the top of pipe The Contractor shall take every possible precaurion to preserve the existing �mprovements All damages to exist�ng improvements from the Contractor's operarion, whether �nnth�n the road right-of-way or in pnvate property, shall be the sole responsibil�ty of the Contractor to remedy The Eng�neer will review the pre-construct�on photographs for confirmarion of possible damage by the Contractor's activibes All such areas ident�fied by the Engmeer shall be restored to their preconstruchon equivalent to the ; sarisfact�on of the Owner � 1-07.17(5) List of Utility Owners �� � � � � Following is a list of the ut�lit�es servmg the work area �ndicahng the name (�f available) and telephone number of the responsible author�ty of the var�ous utilrties which should be nonfied if conflicts or emergencies arise dunng the progress of the work Outside normal workmg hours, report emergencies and mibate contact w�th the appropr�ate ind�vidual by call�ng 911 UTILITY CONTACT TABLE UTILITY UTILITY NAME CONTACT TELEPHONE # Within City of Bremerton, Department of Pubhc Works and Utilihes [PWU): Storm and PWU Pat Jacobsen 473-5920 Samtary Sewers Ned Lever 473-2398 Water PWU Bob Zurbrugg 473-5920 Ned Lever 473-2398 � Crty of Bremerton EarGsrde Beach Mam Replacement March 2013 SP-33 �� Streets PWU Jim Orton 473-5359 Gunnar Fridr�ksson 473-2354 Contact City Engineer Tom Knuckey at 473-2376 if unable to contact PWU mdividuals above OTHER UTILITIES Power Puget Sound Energy Dispatcher 888-225-5773 Telephone Century Link Repa�r Dept 500-573-1311 Gas Cascade Natural Gas Mike Dunn 479-3966 Cable TV Comcast Jerry Biggs 377-8528 415-2477 (pager) Underground Uhlines Locate Service 800-424-5555 All numbers are (360) prefix unless noted otherwise 1-07.18 Public Liability and Property Damage Insurance Delete thrs sect►on in its ent�rety, and replace it wrth the follow►ng 1-07.18 Insurance Qanuary 24, 2011 APWA GSP) 1-07.18(1) General Requirements A The Contractor shall obtain the insurance described �n this sect�on from insurers approved by the State Insurance Commiss�oner pursuant to RCW Trtle 48 The insurance must be provided by an insurer with a raUng of A- VII or higher m the A M Best's Key Ranng Guide, which is licensed to do business in the state of Wash�ngton (or issued as a surplus line by a Washington Surplus lines broker) The Contracting Agency reserves the right to approve or re�ect the insurance provided, based on the insurer (including financial condihon), terms and coverage, the Cerhficate of Insurance, and/or endorsements B The Contractor shall keep this �nsurance �n force dur�ng the term of the contract and for th�rty (30) days after the Physical Complet�on date, unless otherwise indicated (see C below) � C IF any insurance policy is wntten on a claims made form, its retroachve date, and that of all subsequent renewals, shall be no later than the effectrve date of this Contracrt. The policy shall state that coverage is cla�ms made, and state the retroacrive date Claims-made form coverage shall be mamtained by the Contractor for a mmimum of 36 months following the Final Complerion or earlier terminarion of this contract, and the Contractor shall annually provide the Contrachng Agency with proof of renewal If renewal of the claims made form of coverage becomes unavailable, or economically prohibit�ve, the Contractor shall purchase an extended reporhng period ("ta�l") or execute another form of guarantee acceptable to the Contracring Agency to assure financial responsibilrty for l�ab�lity for services performed D The �nsurance policies shall conta�n a"cross liability" provision � � � � C:ty of Bremerton March 2013 � Eastsrde Beach Ma:n Replacement SP - 34 � � � ,� � � � �� � � i � � �' � E The Contractor's and all subcontractors' msurance coverage shall be pnmary and non- contributory insurance as respects the Contract�ng Agency's insurance, self-insurance, or msurance pool coverage F The Contractor shall provide the Contractmg Agency and all Additional Insureds wrth written notice of any policy cancellat�on, wsth►n two business days of their rece�pt of such notice G Upon request, the Contractor shall forward to the Contractmg Agency a full and certified copy of the insurance policy(s) H The Contractor shall not begm work under the contract until the requ�red msurance has been obta�ned and approved by the Contracting Agency 1 Failure on the part of the Contractor to maintain the insurance as requ�red shall const�tute a material breach of contract, upon whtch the Contracring Agency may, after giving five bustness days nobce to the Contractor to correct the breach, �mmed�ately term�nate the contract or, at rts discret�on, procure or renew such �nsurance and pay any and all premiums in connechon therewith, with any sums so expended to be repa�d to the Contrachng Agency on demand, or at the sole discrehon of the Contracting Agency, offset against funds due the Contractor from the Contract�ng Agency All costs for insurance shall be �ncidental to and �ncluded �n the umt or lump sum pr�ces of the contract and no addihonal payment �nnll be made 1-07.18(2) AddrtionalInsured All insurance policies, �nnth the except�on of Professional Liabihty and Workers Compensanon, shall name the follow�ng listed entities as add�tional msured(s) - the Crty of Bremerton and �ts ojj5cers, elected oJj'icials, employees, agents, and volunteers The above-listed enhhes shall be addirional msured(s) for the full available limrts of liability mamtamed by the Contractor, whether primary, excess, conhngent or otherw�se, irrespective of whether such I�mits maintained by the Contractor are greater than those required by this Contract, and �rrespective of whether the Cert�ficate of Insurance provided by the Contractor pursuant to 1-0718(3) describes l�m�ts lower than those maintained by the Contractor 1-07.18(3) Subcontractors Contractor shall ensure that each subcontractor of every t�er obtains and maintains at a minimum the �nsurance coverages listed in 1-0718(5)A and 1-07 18(5)B Upon request of the Contracring Agency, the Contractor shall prov�de evidence of such insurance 1-07.18(4) Evidence of Insurance � The Contractor shall dehver to the Contractmg Agency a Cert�ficate(s) of Insurance and endorsements for each policy of insurance meenng the requirements set forth herein when the Contractor delivers the s►gned Contract for the work. The certificate and endorsements must conform to the following � � requ�rements 1 An ACORD cerhficate or a form determined by the Contracring Agency to be equivalent 2 Copies of all endorsements naming Contracring Agency and all other enrit�es listed in 1-0718(2) as Add�nonal Insured(s), showing the pol�cy number The Contractor may submit a copy of any blanket addrt�onal msured clause from its policies instead of a separate endorsement A � Ctry of Bremerton Easts:de Beach Marn Replacement March 2013 SP-35 � statement of addirional �nsured status on an ACORD Cert�ficate of Insurance shall io sat�sfy this requirement Any other amendatory endorsements to show the coverage requ�red herein 1-07.18(5) Coverages and Limrts The insurance shall prov�de the minimum coverages and limrts set forth below Provid�ng coverage �n these stated mimmum lim�ts shall not be construed to rel�eve the Contractor from liabil�ty �n excess of such limrts All deducribles and self-insured retenhons must be disclosed and are sub�ect to approval by the Contracring Agency The cost of any claim payments falling w�thin the deducrible shall be the responsibility of the Contractor �n��� •�� .� , A policy of Commercial General LiabiIity Insurance, including - Per pro�ect aggregate - Premises/Operarions Liabihty - Products/Completed Operanons - for a penod of one year follow�ng final acceptance of the work - Personal/Adverhsmg In�ury - Contractual Liab�lrty - Independent Contractors Liab�lrty - Stop Gap / Employers' Liabilrty - Explos�on, Collapse, or Underground Property Damage (XCU) - Blashng (only required when the Contractor's work under this Contract �ncludes exposures to which this spec�fied coverage responds) Such policy must provide the followmg mmimum limits - $1,000,000 Each Occurrence - $2,000,000 General Aggregate - $1,000,000 Products & Completed Operarions Aggregate - $1,000,000 Personal & Advertismg In�ury, each offence Stop Gap / Employers' Liabil�ty - $1,000,000 Each Accident - $1,000,000 Disease - Policy Limrt - $1,000,000 Disease - Each Employee ���.�� '-��_..� _ � Automobile Liabitity for owned, non-owned, hired, and leased veh�cles, �nnth an MCS 90 endorsement and a CA 9948 endorsement attached if "pollutants" are to be transported Such policy[ies) must prov�de the follo�nnng mmimum limrt $1,000,000 Worker's Comnensation combined single hmrt The Contractor shall comply with Workers' Compensarion coverage as required by the Industrial Insurance laws of the state of Washington , ,!. . .. , C�ty of Bremerton Eastsrde Beach Marrt Replacement March 2013 SP-36 � �� � � � r � �� r �'� ,, 1I� ri ((� �� � 11� The Contractor shall provide Excess or Umbrella Liability coverage at limits of one (1) million per occurrence and annual aggregate This excess or umbrella liability coverage shall apply, at a mimmum, to both the Commercial General and Auto �nsurance policy coverage This requ�rement may be sansfied instead through the Contractor's primary Commercial General and Automobile Liabilrty coverage, or any combinahon thereof f�f�_��� _ ,Sfl'[� The Contractor shall prov�de a Pollunon Liab�lity policy, prov�ding coverage for claims involving bod�ly in�ury, property damage (including loss of use of tangible property that has not been physically in�ured), cleanup costs, remediation, d►sposal or other handling of pollutants, mclud�ng costs and expenses incurred �n the invest�ganon, defense, or settlement of claims ansing out of 1 Contractor's operarions related to this pro�ect, and/or 2 Remediahon, abatement, repair, maintenance or other work �nnth lead-based paint or mater�als conta�nmg asbestos, and/or 3 Transportat�on of hazardous materials away from any srte related to th�s pro�ect '���1 ( 1-07.23 11 �*****� Such Pollut�on L�abil�ty policy shall provide the follo�nnng min�mum coverage $1,000,000 each loss and annual aggregate Public Convenience and Safety z , Supplement this sect�on with the follow�ng IJ� The Contractor shall do whatever work is necessary for safety and be solely and completely responsible for condit�ons of the �ob s�te, including safety of all persons (includmg employees) and property dunng the Contract penod This requirement shall apply conUnuously and not be limrted to normal worlang hours The Contractor shall at all rimes prov�de proper facilines for safe access to the work by authonzed government officials Work areas shall be barncaded to prevent public access and provide a buffer between the work zone and the pubhc f � 1-07.23(1) Construction Under Traffic < <*****, �ll Supplement this sectton w►th the following The City will request traffic control plans, as applicable, for mob�lization, staging, srte access and/or equipment/mater�al del�very All s�gnage, flagging, channelization, and other traffic control measures shall be in accordance with WSDOT Standard K-plans and MUTCD r � � C:ry of Brernerton Easlsule Beach Marn Replacement March 2013 SP-37 l LY il� The Contractor has the ophon to use a limited secrion of the L�ons Park west parking lot for the purpose of welding HDPE pipe stagmg a barge/boat at the boat ramp The City agrees to grant the Contractor a license to use this area as descnbed and in accordance w�th the terms set forth m the agreement �n Appendix E The Contractor must s�gn and enter into the agreement prior to occupymg the area However, the Contractor is under no obligat�on to enter this license agreement or use this area 1 Potenhal for Contaminated Soils (NEW SECTION) General The possibilrty for encountermg contaminated soils is extremely low However, encountenng such mater�als is of concern because of worker safety and disposal requirements In the event that contaminated so�l is detected, notify the Owner �mmediately Disposal costs �nnll be based on force account and actual invoice costs for disposal Gontractor's Res�nsibihUes. The Contractor shall be responsible for all matters related to worker safety and for detechon of contammated soils and/or groundwater encountered dunng construcUon as they relate to worker safety The Contractor shall ensure the protection of the safety and health of construchon workers and other authonzed persons at the work srte from exposure to potenbally hazardous substances 1 Asbestos Pipe Handling and Disposal (NEW SECTION) The existmg 20" sewer main on the beach is asbestos-cement [AC) pipe, contaimng approx�mately 15% asbestos and 85% cement slurry The Contractor shall not disturb the exishng pipe unless directed by the contract or in order to make a connecrion Workers involved m disturb�ng the pipe, includmg cuthng, removmg, and encapsulating the pipe, shall be tramed and certified in asbestos abatement in accordance �nnth WAC 296-65-010 Traimng cerdficates shall be submitted to the City pnor to any excavarion work on the beach In no instance shall the AC pipe be crushed m the trench Sechons of AC p�pe that have been cut and displaced m order to make a connechon shall be d�sposed of off-srte m accordance �nnth state regulat�ons for disposal of asbestos matenal All costs associated w�th cuttmg, removmg, plugging, encapsulating, handlmg, hauling, and d�sposmg of AC p�pe shall be borne by the Contractor and cons�dered incidental to other contract costs �t� � �� �i l_� 1�� i,�� �'L� r �i ��� 1-07.30 Permitting Agency Requirements for Construction on the Beach (N�W SECTION) ��� The followmg Best Management Practices (BMPs) are requved for comphance wrth the permrts from the federal and state agencies that permit for worlang m the mtertidal zone These requirements are mcorporated mto the contract 1 Construction activrties on the beach are hmrted from June 5(estimated date) to August 31, 2013 If the schedule needs to be extended past August 31, forage fish spawivng surveys will be reqiured pnor to commencmg any work below OHW, to avoid disturbing active spawrung areas Any costs for addrtional pernuttmg wark requued to extend the contract times shall be borne by the Contractor 2 Perform mrtigation and cleanup actrvrties on the beach as descnbed m Section 8-OS and mcluded m Appendix C �i S�' l �� 4� �(� C�ty of Bremerton March 2013 I� �p Eastsrde Beach Matn Replacement sp - 42 � � � � i � � L � � � � � � � � � 3 Beach access shall only occur at the designated areas shown on the Plans 4 If a barge is used for construction, it shall not be grounded except for the use of temporary ramps 5 All land-based mtertidal construction actrvities sha11 occur when the tide is out, and any exposed trenches shall be backfilled pnor to subsequent tidal mundation 6 Do not store or leave equipment or construction matenal on the mtertidal portion of the beach dunng non-worlcmg hours 7 The new sewer mam shall be buned and covered wrth native matenal The e�stmg mam shall be abandoned in place to rrurumize the area of substrate disturbance 8 Avoid disturbmg the existmg nparian vegetation to the extent practical, although some fallen trees or other large woody debns may need to be cut or pushed aside to allow the mstallation of the proposed sewer mam Some vegeta.tion may also need to be cut at the stagmg and access areas, although tlus vegetation consists pnmanly of mvasive species such as blackberry 9 Mamtam all construchon equipment m good worlcmg order to mirurruze the nsk of fuel and fluid leaks or spills 10 When heavy equipment is requ�red, use equipment having the least impact necessary to accomplish the authonzed work (e g, low ground pressure, rrummally sized, rubber tired, or tracked veh�cles) 11 Develop a wntten spill contamment plan and have the necessary matenals on-site pnor to and dwmg construction The plan shall be submitted to the Owner and mamtained on the site at all times 12 Mamta.m sufficient quantrties of oil absorbent pads and booms on site at a11 times to absorb spills of oil, fuel, and hydraulic fluids from construction equipment � 13 Clean equipment that is used for intertidal work prior to operations below MHHW Remove external oil and grease, along wrth dirt and mud Do not dischazge untreated wash and rmse water into local waters or wetlands without adequate treatment � C� l_J � 14 Do not refuel vehicles and equ�pment outside of designated refuelmg area, located away from the shorelme or any designated wetland areas Additionally, dnp pans will be fitted wrth absorbent pads and placed under all equipment bemg fueled 15 Inspect all vehicles operated witlun 150 feet of the shorelme daily for fluid leaks before leaving the velucle staging area Any leaks detected will be repa�red before the vehicle resumes operation 16 If a leak or spill should occur, cease all m-water work until the source of the leak is identified and corrected and the contaminants have been removed from the water 17 Restore any wetland or buffer areas temporanly disturbed dunng construction to their � Crty of Bremerton Eastsrde Beach Ma:n Replacement March 2013 SP-43 � � onginal condrtion followmg construction 18 Prepare and submrt a Temporary Erosion Control and Sedimentation Control (TESC) plan mcorporatmg requirements from the Contract Documents (Section 8-OS), Standard (City of Bremerton) Specifications, City of Bremerton Ordmances and Standards, Waslungton State regulatory requirements, and permrt requirements As part of this plan, the Contractor would be required to have filter fabnc, filter bags, silt screens, or other similar matenal on-hand to mmtiruze sediment reaclung Port Washmgton Narrows 19 Excavate, stockpile, and backfill matenals m a manner that would not allow fine sediments to enter the waters of Port Wastvngton Narrows Approximately mamtam stockpiled matenal wrttun the 20' on erther side of the trench Separate surface matenal (top 6-inches of trench excavation matenal) 20 Limrt the trench width to the maximum extent possible to miruiruze surface disturbance and stockpile size Use temporary sheetmg and trench boxes as needed to support trench walls dunng construction 21 Excavated matenal left on the beach and not placed back in the trench may remam on the beach It shall be graded to match the existmg beach slope, wrth no depressions 22 All trench backfill and gradmg shall be completed pnor to tidal mundation at the end of each work day No equipment is permitted to work on the beach wlule the proJect zone is inundated by tidal waters 23 Set aside the top 6" of native material from the trench and place back as the top 6" to match existmg beach surface material Alternatively, use clean sand as a cap on the trench 24 Where dewatenng of the trench is required, filter the dewatenng water m sedimentation bags (Dandy Dewatenng bag or approved equal) Locate the filter bag upslope m sandy/gravelly beach areas so that the water will mfiltrate mto the beach sediments before reachmg surface water 25 Notify the Owner and cease work immediately m the event that a fish kill occurs or fish are observed m distress m the immediate pro�ect vicimty A state biologist will be notified by the Owner to mvestigate the lcill 1-08 PROSECUTION AND PROGRESS Add the following new sect�on 1-08.0 Preliminary Matters (May 25, 2006 APWA GSP) Add the followmg new sections 1-08 0(1),1-08 0(2), and 1-08 0(3) � � � �� � � � � � � � � � � <� � C�ty of Bremerton March 2013 � Easu:de Beach Mam Replacement SP - 44 � � � � 1-08.0(1) Preconstruction Conference (October 10, 2008 APWA GSP) Pnor to the Contractor beg�mm�g the work, a preconstrucbon conference will be held between the � Contractor, the Engmeer and such other interested parUes as may be �nvited The purpose of the preconstruction conference �nnll be 1 To review the imrial progress schedule, � 2 To establish a worlcmg understanding among the var�ous parties associated or affected by the work, 3 To establish and review procedures for progress payment, norificanons, approvals, submittals, etc , � 4 To establish normal workmg hours for the work, 5 To review safety standards and traffic control, and 6 To discuss such other related rtems as may be perrinent to the work � i � �� i � � �� �� � The Contractor shall prepare and submit at the preconstruchon conference the follo�nnng 1 An �n�t�al progress schedule, 2 A preliminary schedule of subm�ttals, and 3 A l�st of matenal sources for approval �f applicable 1-08.0(2) Hours of Work �*****� Except in the case of emergency or unless otherwise approved in wr�t�ng by the Contracnng Agency, the normal straight nme working hours for the Contract shall be any consecuhve 8-hour period between 7 00 a m and 7 00 p m of a worlcing day wrth a maximum 1-hour lunch break and a 5-day work week Alternanvely, the contractor may work a 10-hour work day and a 4-day work week NOTE• Since much of the work occurs below the Ordinarv High Water Mark the work will be affected b�the tides The Owner will consider and ap�rove schedule ad�ustrnents as needed in order to accomglish the work during low tides. The normal straight time worlang period, including da�ly start and ending rimes, shall be establ�shed at the preconstrucrion conference or prior to the Contractor commencing the work The Owner shall be nonfied in wriring if the Contractor modifies the schedule at any t�me dur�ng construction Written permiss�on from the Engineer is required, if a Contractor des�res to perform work on holidays, � Saturdays, or Sundays, before 7 00 a m or after 7 00 p m on any day, or longer than the scheduled work day The Contractor shall apply in wr�t�ng to the Engineer for such permission, no later than noon on the working day prior to the day for wh�ch the Contractor is request�ng perm�ssion to work � � � Permission to work Saturdays, Sundays, holidays, or other than the agreed upon normal straight nme working hours Monday through Fnday may be given sub�ect to certain other condrtions set forth by the Contracnng Agency or Engineer These condrtions may include but are not limited to The Engmeer may requ�re designated representaUves to be present dunng the work Representarives who may be deemed necessary by the Engineer include, but are not limrted to survey crews, personnel from the Contracbng Agenc,�s matenal teshng lab, inspectors, and other Contrachng Agency employees when m the opimon of the Engmeer, such work necessitates their presence � C:ty of Bremerton Eastsrde Beach Marn Replacement March 2013 SP-45 � 1-08.0(2)A �*****� 1-08.0(3) Night Work (NEW SECTION) - NOT USED Reimbursement for OT Work of Contrachng Agency Employees (May 25, 2006 APWA GSP; may not be used on FHWA funded pro�ects) Where the Contractor elects to work on a Saturday, Sunday, or holiday, or longer than an 8-hour work shift on a regular worlcing day, as defined in the Standard Specifications, such work shall be considered as overrime work On all such overtime work an inspector v►nll be present, and a survey crew may be requ�red at the discrehon of the Engmeer In such case, the Contrachng Agency may deduct from amounts due or to become due to the Contractor for the costs m excess of the straight-hme costs for employees of the Contracting Agency required to work overhme hours The Contractor by these spec�ficataons does hereby authorize the Engineer to deduct such costs from the amount due or to become due to the Contractor 1 Weekly Construction Meetings (NEW SECTION) Weekly meerings shall be held at a mutually agreed-upon locanon and day of the week and rime The purpose of the meering �nnll be to d�scuss the work, resolve any quant�ty or force account disagreements, rev�ew the Contractor's Progress and Schedule, and review the record dra�nnngs The Contracting Agency shall develop an agenda for each weekly meeting The Contractor shall provide an updated 3-week look- ahead schedule for each meeting 1 Other Meetings (NEW SECTION) Dur�ng the course of the pro�ect, rt w�ll be necessary to schedule addirional meerings that the Contractor shall attend to e�ther review and discuss specific issues on topic that may be too involved for inclus�on m the weekly progress meenng or require involvement form others not directly associated with the pro�ect When a special meenng is required, the Engmeer �nnll coordinate rime and place for all required attendees Special meet�ng topics may include - Work sequence - Coord�nat�on for bypassing and connection work 1 Construction Constraints and Work Sequence (NEW SECTION) The Owner does not require a specific construcbon sequence to perform the work. There are four locahons where a section of the exishng 20" AC pipe must be disconnected and the new pipe connected to the eanshng system The connechon work will requ�re coordinanon with the Owner and sequencing of the work, smce bypassing and stoppmg flow m the exisnng sewer system is requ�red This work of coordmanng �nnth the Owner and sequencing the work is discussed in Sechon 7-17 Follo�nnng is a general recommended sequence of construction for the pro�ect 1 Mobihzanon C:ty ofBremerton March 2013 Easlstde Beach Mam Replacement SP - 46 2 Begin welding 24" HDPE Pipe 3 Construct West End Beach Access Road 4 Pothole exishng force main 5 Remove rtems from beach in accordance `nnth Beach Mit�ganon plan 6 Install new 24" pipe and test p�pe 7 [nstall tees or taps with valves at Sta 5+25,13+87 and at air valve locabons 8 Install temporary bypass pipe 9 Make connechon at Stahon 30+82 10 Make connechon at Stat�on 1+00 11 Make connechon at Stabon 5+25 (Lent Landing) 12 Make connechon at Stat�on 13+87 (R�p Tide Condo) 13 Install air valves 14 Completely achvate new sewer pipe 15 Remove temporary bypass 16 Any remamtng work H !7 1-08.3 �*****� Progress Schedule 1-08.3(1) General Requirements �*****� Supplement th�s sect�on w�th the follow�ng The Contractor shall submit a Type B Schedule The Contractor shall use the following scheduling software Pnmavera Systems, Primavera Pro�ect Planner or SureTrak 2007 or later Microsoft Pro�ect 2003 or later Other, only as approved by the Owner 1-08.3(2) Progress Schedule Types Supplement thrs section wrth the follow�ng The Contractor shall provide a monthly update to the Type B Schedule, to be submitted at the first weekly meebng of the month Payment will be �nnthheld unt►1 the updated schedule has been submitted 1-08 4 �*****� Nohce to Proceed and Prosecution of the Work Delete the text in this sect�on and replace with the following paragraph Refer to Secnon 1-04 12 for description of phased Norice to Proceed C�ty of Bremerton Eastrtde Beach Ma:n Replacement March 2013 SP-47 Y �� ( � I_ 1-10 1-10.1 �*****� TEMPORARY TRAFFIC CONTROL General Supplement th►s section by insert�ng the following SCOPE OF PROJECT TEMPORARY TRAFFIC CONTROL. Mimmal traffic control is required on this pro�ect since nearly all the work occurs below the Ordinary High Water Mark (OHWM) on the beach Antic�pated traffic control includes that required for stagmg and for oprional use of Lions Park parlang lot No traffic control plans have been included in the contract documents The Owner �nnll request traffic control plans as needed for any work on City streets Any matenals, labor or equipment required for maintaming traffic flow during the life of th�s Contract shall be furnished, placed and maintained by the Contractor, immediately upon request by the Engineer Furn�shing of and preservarion and maintenance of traffic control devices shall be the sole responsibil�ty of the Contractor Emergency traffic such as police, fire, and d�saster units, shall be provided access all nmes The Contractor shall be liable for any damages, which may result from failure to provide` reasonable access or coordinahon R�quired Notificanon of Busmesses and Res�dents. The Contractor shall not�fy all affected busmesses and residents by door hanger or other similar method approved by the Eng�neer at least one calendar week in advance of construchon act�v�ries ad�acent to ,the�r business or home Addrtionally, the Contractor shall notify all affected busmesses and res�dents at least 48 hours and not more than 72 hours m advance of construcrion achvihes that would block or restnct access to the�r businesses or homes Blockage shall occur only during worlc�ng hours and shall be removed during non-worlc�ng hours F_xisnng�gns. Devices. and Pavement Marltnes. Existing traffic control and street name signs which mterfere �nnth construction shall be relocated, covered, or removed by the Contractor and temporar�ly stored in a safe place "Stop", "Yield', and "One-Way" s�gns shall be removed, covered or relocated only upon approval of the Engineer Ex�sting signs shall not be removed until the Contractor has prov�ded temporary measures sufficient to safeguard and direct traffic after the exist�ng signs have been removed Except as otherwise specifically prov�ded m the contract documents, preservarion and maintenance of traffic control and street name signs shall be the sole responsibilrty of the Contractor As work progresses and as permits, temporarily relocated or removed traffic and street name signs shall be reset in the�r permanent locahon by the Contractor Signs and other traffic control devices damaged or lost by the Contractor, shall be replaced or repa�red by the Contractor at no cost to the C�ty The opt�on of whether a sign can be repaired or shall be replaced shall be the Engineer's, and such decision shall be final and b�nding on the Contractor When paint lines are obliterated due to construction acrivit�es or pavement restorabon, temporary pressure sensitrve pavement marlang tape, traffic buttons or delineators shall be �nstalled where des�gnated by the Engineer These temporary features shall be removed only upon installanon of permanent traffic channelizanon Unless otherwise provided for by a separate b�d item in the proposal, removal of permanent stnping and installation and removal of temporary stnping shall be incidental to the unit contract pr�ce for other items in the proposal Crty of Bremerton Easurde Beach Ma�n Replacement March 2013 SP-52 1i t (I_� �� � L� }�' ��� 1�_� 11`� 1�{ �J l� � �� ��� `� �� ) � � r , , Maintaimng Two-way Traffic and Access. Except as authonzed by the Engineer, two-way traffic shall be maintained at all t�mes No dead-end streets will be allowed to have less than one way access at any hme Dur�ng normal working hours, the Contractor shall matntain, �n a safe, acceptable condit�on, all approaches and intersecnons �nnth roads, streets, alleys, and driveways to businesses, parlcing lots, res�dences, etc All streets shall be open to local traffic at the end of each work�ng day unless other�nnse noted m the approved Traffic Control Plans The Contractor is permitted to close the portion of Campbell Way that has been designated for staging but is required to maintain local access for the two homes at the east entrance of Campbell Way The entrance shall be clearly signed indicating the closure. Except where perm�tted elsewhere �n the Contract Documents or author�zed by the Engineer in writing, � dunng non-workmg hours, excavanons �nnth�n roadways, driveways, pedestrian pathways, or similar areas �nnthin rights of way or easements used by the publ�c shall be backfilled, compacted and covered with cold mix asphalt or covered w�th steel plates or other approved temporary bridging � � u The Contractor shall conduct the work so as to obstruct and inconvenience traffic as little as poss�ble The Contractor shall not open sechons of the work and leave them in an unfinished condit�on During normal working hours, the Contractor shall ma�ntain, in a safe, acceptable condrtion, all approaches and intersections with roads, streets, alleys, and driveways to businesses, parking lots, residences, etc All streets shall be open to local traffic at the end of each worinng day unless otherwise noted in the approved Traffic Control Plans Durmg non-working hours, the Contractor shall keep ex�st�ng traffic lanes clear, w�thout interference from construchon operat�ons, equ►pment or materials � � , �.J � �� � � 1 Description (May 25, 2006 APWA GSP) Revise the third paragraph to read The Contractor shall provide signs and other traffic control dev�ces not otherwise specified as be�ng furmshed by the Contracring Agency at no add�rional cost The Contractor shall erect and ma�nta�n all construchon signs, warning signs, detour signs, and other traffic control devices necessary to warn and protect the public at all t�mes from in�ury or damage as a result of the Contractor's operat�ons which may occur on highways, roads, streets. sidewalks. or �aths No work shall be done on or ad�acent to � traveled wav unt�l all necessary signs and traffic control dev�ces are in place 1-10.2 1-10.2(1) �*****� Traffic Control Management General Supplement this section with the following The TCS shall be on-srte wh�le work or unloading/loading is occurr�ng on City streets The TCS shall be respons�ble for placement, maintenance, correctness and adequacy of the contractor's temporary traffic control The TCS will be contacted to correct any traffic control or sigmng deficiencies during normal working hours or dur�ng evenmgs or weekends as necessary or required The TCS shall respond as required by Standard Specificahon 1-10 2(1)B If the Traffic Control Superv�sor or the Contractor's forces do not � Crty of Bremerton Easlsrde Beach Mam Replacement March 2013 SP-53 � � respond w�thin the required time, the C�ty will make any necessary correcrions usmg its own or other forces and shall deduct the enhre cost of all such work from sums due, or to become due, to the Contractor All such charges against the Contractor's payments shall be made at the City's then current rates for labor, equipment, and materials The TCS shall be cerhfied by one of the follownng orgamzarions The TCS cemficat�on shall be submitted to the City prior to any construcrion American Traffic Safety Serv�ces AssociaUon 5440 Jefferson Davis Hwy Fredencksberg, VA 22407 (703) 898-5400 Sverdrup Civil, Inc c/o Traffic Control Supervisors Sem�nar P 0 Box 97062 I{irkland, WA 98083-9762 (206) 822-3300 The Northwest Laborers-Employers Training Trust 27055 Oh�o Ave Kmgston, WA 98346 (360) 297-3035 1-10.2(2) Traffic Control Plans �*****� Supplement th►s sectron by insert►ng the following No traffic control plans have been �ncluded �n the contract documents Except for staging and mobilizahon, there �s no other work scheduled on Crty streets The Owner �nnll request traffic control plans as needed for such as acbv�ries as load�ng/unloading of equipment and mater�als The plans shall be developed in accordance �nnth the MUTCD, latest edirion and WSDOT Standard "K" Plans 1-10.3 Traffic Control Labor, Procedures and Devices 1-10.3(3) Traffic Control Devices Supplement th�s sect�on by inserting the following All signs required for traffic control as well as any other s�gns prescribed by the Engineer shall be furnished by the Contractor 1-10.3(3)L Parlang Restazction Signs (New Section) �*****� � � r� �_ , � � � ' � � ' � � � � Where, in the opimon of the Engineer, parlang is a hazard to thru-traffic, or to the construcrion work, parking may be restricted erther enhrely or during the time when it creates a hazard S�gns for � restr�cring parking shall be approved by the Eng�neer and prov�ded and placed by the Contractor The Contractor shall be respons�ble for and shall maintain the signs, if they are used in any street that is Ctty of Bremerton March 2013 � Eastsrde Beach Ma:n Replacement SP - 54 � � � , r 1 � � directly involved in the construcbon work If parinng signs are used beyond the confines of the work area, such as in another street being used as a detour, the signs will be the responsib�lity of the Contractor The placement of s�gns resttzct�ng parking shall be as approved by the Engineer Parking restnction signs shall be placed two working days �n advance of needmg the parlcing removed, w�th the start date of the "no parkmg" clearly shown The area to be restricted shall be clearly marked �nnth Type I barricades carrying signs that give the specific period (dates and t�mes) that the area is to be clear of vehicles Signs shall be large enough to be easily read from a distance of 50 feet and shall advise where impounded vehicles will be stored or mdicate a 24-hour telephone number for obtaimng that �nformat�on A mimmum of 72 hours advance norice is required before towing vehicles All s�gns must be approved by the Engineer pr�or to use Example wording of the signs is as foIlows WARNING� TOW AWAY ZONE NO PARKING FROM• DATE and TIME TO DATE and TIME FOR CONSTRUCTION WORK ALL VEHICLES REMAINING WILL BE TOWED 1-10.4 � �*****� r-� LJ Measurement Delete the entrre sect�on and replace with the follow►ng No specific umt of ineasurement �nnll apply to pro�ect temporary traffic control � 1-10.5 �*****� � , � ' � � � Payment Delete the entire section and replace w►th the follow►ng Payment for pro�ect temporary traffic control shall be considered incidental to the �other work m the Contract Documents, mcluding all equipment, labor and vehicles for implemennng traffic control plans, including providing flagging, TCS, umformed traffic control, Class A and Class B construction signs, detour routes, cones, barncades, flashers, sequenrial arrow signs, traffic safety drums, removal of permanent stnping, installing and remov�ng temporary striping and arrows, and other temporary traffic control devices � Ctty of Bremerton Eastsrde Beach Marn Replacement END OF DIVISION 1 March 2013 SP-SS � DIVISION 2 EARTHWORK 2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP 2-01.1 Descriphon �*****� Delete the first paragraph of this Sect►on and replace wrth the follow►ng The Contractor shall clear and grub, prune tree hranches, remove rocks, stumps, fallen trees, limbs and other natural and man-made matenals requ�red for the prosecunon of construcbon acdviries Woody debns and branches in the trench path and that mterfere vvith construchon equipment shall be cut and placed aga�nst the toe of bank. Reference Sechon 8-05 for removal of man-made debns assoc�ated �nnth the bid rtem, "Beach Mit�gabon and Cleanup " 2-01.2(1) Disposal IVlethod No.1- Open Burning �*****� Delete this Sect►on and replace with the following The open burmng of residue resulring from land clearing will not be allowed 2-01.2(2) Disposal Method No 2- Waste Sate �*****� Delete this ent►re Section and replace wrth the following Debns shall be hauled to a waste srte obtained and provided by the Contractor �n accordance wrth Secnon 2-03 3(7)C All fees for hauling and d�sposal shall be paid by the Contractor Asbestos-cement (AC} pipe disposal shall be disposed of at a regulated site �n accordance with state regulanons for disposal of asbestos material 2-01.3 2-01.3(4) �***:*� Construction Requirements Roadside Cleanup Delete Secdon Z and replace th�s title and section w►th the follow►ng 2 Cleanup and Restoration From hme to rime throughout the progress of the work, the Contractor, when d�rected by the Owner's � Representat�ve, shall cleanup and remove all refuse and unwanted or unused materials resulring from the work, at the Contractor's expense If the Contractor fails to do so w�th�n 24 hours after the request by the Cety of Bremerton Easts:de Beach Marn Replacement March 2013 SP-56 � � � � , � u � , S ' ' � , Owner's Representahve, the work may be done by the Crty and the cost thereof be charged to the Contractor and deducted from his final est�mate All cleanup shall be performed as spec�fied in the various secnons of these Specificanons Final cleanup shall be �n accordance with Sect�on 1-0411 2-01.4 Measurement �*****� Delete th�s Sectron 2-01.5 Payment �*****� Delete this entire Section and replace with the following All work associated with "Cleanng and Grubbing" shall be considered incidental to other items w�thin this contract and no addinonal payment will be made Landscaping, rocker�es, ut�liries, fences and other improvements shall be protected from harm, and if damaged shall be restored to or�ginal condition at the contractor's expense Rockeries, fences, and walls that are disassembled in order to perform construction achviries shall be restored to or�gmal cond�non prior to pro�ect complet�on 2-04 HAUL �*****� 2-04.4 Measurement Delete th�s sect�on and replace with the following text There is no measurement for hauling � 2-04.5 Payment Delete this sect�on and replace w►th the following text , Haulmg and disposal shall always be considered mcidental to other b�d rtems in prov�dmg a complete contract in accordance �nnth Sechon 1-041 L__J � , LJ � 2-07 WATERING 2-071 Descripbon Supplement this Sectcon by �nserting the following Water may be obtained from C�ty hydrants The Contractor w�ll be required to deposit $2000 for rental of a hydrant meter and backflow preventer assembly �nnth the Owner No charge for water w�ll be made unless there is obvious waste 2-07.5 Payment Delete this ent►re section and replace with the following Crry of Bremerton March 2013 Eastsrde Beach Marn Replacement SP - 57 � r LJ No specific payment for furmshing and placing water shall be made Water required for dust and mud control `nnll be considered incidental to the contract SECTION 2-09, STRUCTURE EXCAVATION 2-09.1 �*****� Description Supplement th�s sect►on w�th the followmg text Structure excavarion shall include excavarion for structures associated v+nth this pro�ect See Div�sion 7 of the Standard Specifications and these Special Provisions for work related to trench�ng and backfillmg 2-09 3 2-09.3(1) 2-09.3(1)D Construction Requirements General Requirements Disposal of Excavated Material Delete the contents of this sect�on and subshtute the following Surplus excavated material shall be graded into the beach, mainta�ning a smooth downward slope to the water with no depress�ons Under the head►ng Stockpilmg, supplement with the following Stockpiled matenal shall not be left on the beach at the end of each work day Matenal shall erther be backfilled into the trench and compacted, or graded into the beach pnor to t�dal inundarion Provide adequate rime each day for ensunng that excess matenal is backfilled or graded Material that is excavated from the trench and �s surtable as backfill shall be stockpiled at the site or near the srte If necessary, transport excavated material from the place rt was excavated to the locabon on the pro�ect srte where rt w�ll be needed for backfill Do not dispose of any excavated matenal that is surtable for backfill if rt may be needed anywhere on the pro�ect If excavated matenal is disposed of and later found to be needed on the pro�ect, furmsh surtable imported matenal at no addirional cost to the City For matenal that �s stockpiled in staging areas, protect from mo�sture and erosion by cover�ng at the end of each worlang day �nnth 6 mil plasric sheeting and/or dunng wet weather Should the stockpiled excavated mater�al become unsurtable for backfill due to the Contractor failing to protect �t, the Contractor shall dispose of the excavated mater�al and import surtable matenal conformmg to the Plans and Specificarions at no extra cost to the Owner 2 Construction Requirements, Structure Excavation, Class B Shor�ng and trench safety system shall be the sole responsibilrty of the Contractor All trenches greater than 48" depth shall be shored Shor�ng shall comply v�nth Chapter 296-155 WAC and Chapter 49 17 RCW of the Washington Safety and Health Act Ctty of Bremerton Eastsrde Beach Ma:n Replacement March 2013 SP-58 , � � II � L ' � , L�] � ' I 'J � � , � � r � � � , � , � , ' � � � , � � � � ' � � 2-09.4 Measurement Delete the section and replace wrth the following All structure excavahon required to complete the pro�ect shall not be measured, except "Shonng or Extra Excavanon, Class B", which shall be paid as lump sum 2-09.5 Payment � Delete th►s section and replace with the following Structure excavahon shall be cons�dered incidental to other b�d items "Shonng or Extra ExcavaUon, Class B" shall be lump sum for all shor�ng and trench safety systems required to complete the pro�ect m accordance w�th RCW 39 04180 and RCW 4917 END OF DIVISION 2 C:ty of Bremerton Eaststde Beach Mam Replacement March 2013 SP-59 DIVISION 4 BASES 4-04 4-04.1 BALLAST AND CRUSHED SURFACING Descripiaon Delete this entire Sect►on and replace w�th the following This work shall consist of placmg ballast and crushed surfacing upon compacted surface in accordance with the Contract Documents and in conform�ty �nnth the lines, grades, and depths shown �n the plans or as establ�shed by the Engineer Br�ck pavers for West End Access Road outside of wall shall be Unilock Turfstone permeable paver or approval equal The open space shall be filled �nnth pea gravel Place fabr�c (M�rafi 140N or equal) between CSTC base and paver to m�mmize vegetative growth 4-04.4 Measurement �*****� Delete th►s ent►re sect�on and replace with the follow►ng There �nnll be no measurement for ballast and crushed surfacing There �nnll be no measurement for the bid rtem, "West End Beach Access Improvements " 4-04.5 Payment Delete this sect�on and replace with the following There will be no payment for ballast and crushed surfacmg It shall be considered incidental to the bid rtem "West End Beach Access Road Improvements " Payment for the b�d rtem, "West End Beach Access Improvements", lump sum, �ncludes the complete cost to construct beach access road and associated improvements at Eastside Treatrnent Plant lower parlang as descr►bed on Sheets C1 and D5, including sawcut, wall and fence demol�non, new fence construchon, and road construchon END OF DIViSION 4 City of Bremerton March 2013 Easts:de Beach Ma:n Replacement SP - 60 O , � � , ' ' � ' � � � � ' � , , � � DIVISION 5 SURFACE TREATMENTS AND PAVEMENTS 5-04 HOT-MIX ASPHALT 5-04.1 Description Delete this entire Sect�on and replace w�th the follow►ng There is no scheduled HMA placement for this pro�ect Where ex�sting asphalt pavement is damaged in stag�ng areas or in the ROW due to the Contractor's work, remove and replace �nnth 6" of compacted CSTC and 3" of PG 64-22, Cl Ifi" HMA 5-04.4 Measurement �*****� Delete this ent►re sect►on and replace wrth the following There will no measurement for HMA 5-04.5 Payment Delete this section and replace with the following There �nnll be no payment for HMA or crushed surfacing where replacement �s required due to damage by the Contractor END OF DIVISION 5 Ctty of Bremerton Easurde Beach Mam Replacement March 2013 SP-6] � L� DIVISION 7 7-08 7-08.2 �*****� DRAINAGE STRUCTURES, STORM SEWERS, SANITAItY SEWERS, WATER MAINS AND CONDUITS GENERAL PIPE INSTALLATION REQUIREMENTS Materials Sect►on 7-082 is supplemented with the following Pipe beddmg shall be select nanve mater�al as approved by the on-srte Crty representahve Surface gravel shall not be used as bedding material 7-08.3 7-08.3(1)A Construction Requirements Trenches Delete the first paragraph and replace with the followmg Reference pipe �nstallaUon notes on Sheet D1 for add�nonal trench�ng requirements 7-08.3(1)C Bedding the Pipe Supplement this sechon with the followmg Bedding matenal shall be as descr�bed in Sect�on 7 2 7-08.3(1)D Control of Water (NEW SECTION) �*****� Provide and operate pumping equipment to keep trench free of water at all hmes, whether surface water, seawater from tidal influence, or sewage Under no circumstances shall sediment-laden water or sewage be permrtted to enter the waters of the State of WA. Appropr�ate correchons �n the Contractor's method shall occur immediately when directed by the Owner Should the Contractor be unequipped to correct the srtuabon immediately, the Con� shall not proceed v�nth the de-water�ng until such rime as the Contractor is able to remedy the srtuarion No compensanon shall be made to the Contractor for any resulhng down or idle time An acceptable filtrarion method for sediment-laden water shall be the Dandy Dewatenng Bag (htto //an��w dan�.lynrodu� cts com/Products�DandyDewatenngBag asnx) or approved equal Pnor to cumng an exisnng sect�on of pipe, the Contractor shall stop flow and dra�n the pipe to the greatest extent possible The Contractor shall prov�de any means necessary to stop flow and drain the pipe, tnclud�ng provision and operation of pumps, tarps, hoses and fittings If pumping is required, the Owner will ass�st the Contractor m providing an adequate location for d�scharging sewage �nto the eansting system, though in some cases the closest point to discharge into the exishng sarutary system �s several hundred feet away Confirm the locat�on of discharge to the samtary sewer prior to the work to provide the correct length of hoses and pumping equipment C:ty ofBremerton Easts:de Beach Ma�n Replacement March 2013 SP - 62 ' � � � , � � � �J � � L� � � ' r ' � � � r 7-08.3(3) Backfilling , r ' � ��J Delete the second, third, and fourth paragraphs and substitute Trench backfill shall be native material Do not place stones larger than 3-inch diameter within 1 foot over top of pipe to prevent damage to pipe Excavated material may be stockpiled next to the trench but shall be backfilled or graded into the beach prior to daily tidal inundarion No stockp�les are permitted on the beach at the end of the work day No trenches on the beach shall be left open during non-work hours Prov�de compachon using hand-operated equ�pment at 36" above the top of the pipe Displaced trench material shall be graded �nto the beach to maintain a smooth downward gradient from the top of the slope to the water �nnth no depressions Reference pipe installat�on notes on Sheet D1 for addrt�onal trenching requirements , 7-08.3 (4) Plugging Eansting Pipe , � LJ � ' � , � � , Delete the paragraph and replace with the following te�ct Whenever a sechon of exishng p�pe is cut, it shall be dramed and plugged wrth concrete or cement�tious grout in accordance �nnth the p�pe plug detail to ensure no water or debns can enter the abandoned p�pe Plug CI and DI p�pe �nnth an MJ cap Plugging exist�ng pipe �s considered �ncidental to all other work Reference Detail2/D1 7 Utilrty Excavabon (Potholing) — (NEW SECTION) The Plans show the alignment of the existing 20" AC pipe The alignment was determined using an electronic locanng device (sonde) wh�ch was floated down the pipe, allo�nnng the pipe to be located from the surface The City does not guarantee the accuracy of the pipe alignment as shown on the Plans, since the locanon has not been visually verified along the ennre length Pothole to locate the existing p�pe centerl�ne per the following schedule POTHOLING TO LOCATE EXISTING PIPELINE Locations Pothole Frequency Estimated Total Stahon 1+00 to 5+00 Every 100' 5 Stat�on 5+25 to 7+25 (through Every SO' 5 estuary and around bend) Stahon 8+25 to 30+75 Every 100' 23 TOTAL 33 The potholing shall be coord�nated w�th �nstallanon of the new p�pe Ad�ust the location of the new pipe based on the potholing results to maintam a 5' clearance between the new and exisnng p�pe ' Crty of Bremerton EasJsrde Beach Mam Replacement March 2013 SP - 63 ' �_J � Addirionally, the Contractor shall pothole as needed at the connechons points 1+00, 5+35, 13+87, and 30+82 to determine depths, layout dimens�ons, and materials types The locanon of the exist�ng connection points at 5+35 and 13+87 is eshmated and must be visually confirmed via potholmg NOTE The exisdng 20" AC pipe (Class 100) is operahonal, filled �nnth raw sewage, and under low pressure (1 to 3 psi). It shall be protected at all dmes during the work untal all connections have been made to the new pipe and the new pipe is placed in operation The Contractor is solely responsible to confirm the locataon of the existang p�pe in order to mimmize the possibility of damage during the work. The Contractor is solely responsible for prevenhng and managing sewage spills that may result from damaging the exishng pipe during the work. Any monetary penalties incurred from sewage spills shall be deducted from payment to the Contractor Maintain at least two repair bands on-site during the work to repair the pipe �f darnaged during constructaon (Romac Style CC Double Sechon Repair Clamp or equal). 7-08.4 Measurement Delete this sect�on and replace with the follo�nnng text Plugging and removing exist�ng pipe is not measured Control of water �s not measured Urility Excavarion (Potholing) is not measured Reference Sectlon 7-17 for measurement associated �nnth pipe and fithng installat�on and appurtenances 7-08.5 Payment Delete this sectaon and replace with the following text Plugging and removing exisring pipe is considered mcidental to the work. Control of water �s considered �ncidental to the work Ut�l�ty Excavat�on (Potholing) is considered incidental to the work Reference Section 7-17 for payment associated w�th piping �nstallat�on and appurtenances 7-17 SANITARY SEWERS �*****� 7-17.1 Description Supplement this sechon with the following This sechon also �ncludes the valves, fithngs, and appurtenances for providing a complete, fully-funchon►ng and connected piping system m accordance tnnth the Contract Documents Ctty of Bremerton Eaststde Beach Ma:n Replacement March 2013 SP-64 � , ' , ' � ' � O � � ' r ' LJ r � �i , , 7-17.2 ' � ' , � r Materials Supplement this sect�on �nnth the following Unless noted otherwise on the plans, sewer pipe between Starions 1+00 and 30+82 shall be butt-fus�on welded High Densrty Polyethylene Pipe (HDPE), DR 21, Iron Pipe Size (IPS), in accordance �nnth Section 9- 05 23 Electrofusion couplings are perm�tted for connecring fithngs and long, welded sechons of pipe Where HDPE flanges are used, flange backer r�ngs shall be sta�nless steel HDPE fittmgs shall be DR 17 or thicker- walled, IPS, with connechons as shown on the Plans Duchle iron fithngs shall meet the requ�rements of ANSI/AWWA C110/A2110 F�thngs shall be erther flanged or mechamcal �o�nt and prov�ded in accordance wnth the Plans DucUle �ron fimngs, valves, and spools shall be restramed using flanged connechons, EBAA Iron MegaLug, Romac RomaGnp, Romac Field Flange or approved equal Duct�le �ron p�pe spools shall be Class 53 thickness AVVWA C900 and C905 (PVC) spools shall be DR 25 All PVC spools shall be restrained using EBAA Iron Megalug for PVC p�pe, EBAA Iron MegaFlange (Senes 2100), Romac RomaGnp, or approved equal for providing mechamcal �oint restraint of C900 and C905 p�pe For fithngs, the type, mater�al, and connechon are mdicated on the Plans If the Contractor proposes to use alternat�ve fithngs or connecdons than shown in the Plans, this change shall be requested in wriring and require wrrtten approval from the Owner Coanng for duct�le iron p�pe, spools, and fitdngs � • Inter�or Factory applied Protecto 401 [mm�mum 40 mils) • Field-cut edges Touched up �nnth Protecto 401 and allowed suffic�ent hme to cure pnor to mstallation ' r • Exter�or a -� � <- °.� � Pnmer \ Tnemec,Senes N69, 5 m�ls - Top Coat Tnemec,Senes N69, 5 mils All nuts, bolts, and washers shall be 304 SS All valve boxes shall be two-piece cast iron, and equ�pped with a suitable extens�on for a 36-inch to 65- � mch trench depth Top secnons and lids will be designed for installat�on in veh�cular areas Lids �nnll be labeled "SEWER", and lid tabs will point m the direcrion of the water or sewer main All valves and valve boxes will be set plumb wrth the valve box centered on the valve Valve box installahon shall comply w�th the details shown in the plans for paved area locations and unpaved area locabons ' ' Gate valves shall be m conformance �nnth the latest version of AWWA C-515 w�th non-rising stems Non- r�sing stems shall be cast-bronze Valves 18" diameter and greater shall be bevel-gear actuated The body and bonnet shall be fusion-bond epoxy coated in accordance with AWWA C550 both inside and out Acceptable manufacturers mclude Mueller, Clow Valve Company, M&H Valve, and AVK. All nuts, bolts, and washers shall be 316 SS , 7-17 3 ' Construction Requirements Supplement th�s sect�on �nnth the followmg All HDPE sewer pipe shall be installed with locat�ng wire Wtre shall be UL l�sted, type UF, 14-gauge copper, green color and taped to the top of the pipe to prevent movement durmg backfilling The wire ' C:ty of Bremerton Eaststde Beach Ma:n Replacement March 20/3 SP - 65 LJ � shall be laid loosely enough to prevent stretching and damage The v►nre shall be run into the valve box and connected to the valve at either end of the pipelme and at the side sewer connect�on points Stake the installed centerl�ne of pipe every 50' us�ng 10' offset to allow survey by City staff HDPE PiFe Flangf: Installat�on: MJ Adapters and flanges shall be centered and al�gned to the matmg component before assembl�ng and tightening bolts In no case shall flange bolts be used to draw the connecnon into alignment Bolt threads shall be lubncated, and flat washers should be used under the nuts Flange connect�ons shall be installed in accordance `nnth the manual TN-38 from Plasncs Pipe Inst�tute t�tled Bolt Torque for Polyethylene F7ange Jotnts (July 2011) Bolts shall be hghtened us�ng a cnss-cross pattern nghtening sequence as shown in Table 1(pg 9] of TN-38 Flanged connect�ons must be retorqued m 4 to 24 hours after mirial torqueing in accordance with TN-38 Bolts shall be torqued to values indicated �n Table 2(pg 10) and Table 3(pg 11) of TN-38 TN-38 can be found at http�J/nlast�cn�De orgjndf/tn-38 bolt torque �ed �o�nts.ndf Handhng P�pe. When lift�ng �nnth slmgs, only wide fabric choker slmgs capable of safely carrying the load shall be used to lift, move, or lower pipe and fittings Wire rope and chain are proh�b�ted Slmgs shall be of sufficient capacrty for the load and shall be inspected before use Worn or damaged equ�pment shall not be used Internal butt-fus�on weld beads at �oints shall be cut out and removed When the HDPE pipe exterior is gouged, the damaged secrion shall be replaced when gouge depth is greater than 20% of the p�pe wall thiclrness Perform a video �nspechon of the HDPE p�pe after all welds have been completed, pipe is m place and pnor to malcing connect�ons Based on the video results, remove any foreign ob�ects larger than 3" diameter from the pipe Install each valve �nnth cast iron valve box and valve key up to grade �n accordance with detail m the Plans Where the valve is sewer valve, the hd shall clearly mdicate the valve is a sewer valve Reference Section 1-07 30 for cuthng and abatement requirements of exishng 20" asbestos-cement p�pe Plne Press�re Testin� Rg Q�irements: The pipeline shall be hydrostat�cally pressure tested from Sta 1+00 to Sta 30+82 in accordance w�th Section 7-09 3(23) of the Standard Spec�ficat�ons The test pressure shall be 40 psi mimmum for 15 m�nutes and there shall be no drop in pressure during the test The fittings and gate valves at Stat�ons 5+35 and 13+87 shall be installed prior to the pressure test to confirm integr�ty of these connechons The Contractor shall provide the water used for filling the pipel�ne for the test A test�ng plan shall be prepared by the Contractor and submitted to the Owner for rev�ew and approval at least 7 days prior to the test A suggested method for tesnng the pipe �s described as follows • Install new pipeline to correct l�ne and grade • Install valves and fimngs at Starion 5+35,13+87, and air relief valve locanon(s), but do not make connect�on to ex�sring pipe or air valve • Weld and install temporary flange on each end of the pipe • Install bl�nd flange at each end flange with mpple, valve and gauge for filling w�th water, pressurizing, and evaluaring pressure • Fill pipe wrth water • Pressurize pipe for test and remove all a�r ' ' , , ' ' � , LJ a LJ r LJ � ' �] Crty of Bremerton March 2013 ' Eastsrde Beach Ma:n Replacement SP - 66 �J � f _J ' ' ' C� , � • Perform pressure test • Upon complenon of successful test, remove welded flange and complete connecrion work at either end 7-17.3(1) Temporary Bypass System at Station 30+82 (NEW SECTION) A temporary bypass system shall be mstalled at Stanon 30+82 in order to convey flow from the exist�ng 20" AC pipe to the 16" siphon main while connections are being made as described in the follo`nnng sect�ons The system shall be �nstalled, fully-connected and operanonal prior to malang any of the connecrions between the exishng and new p�pe as described in the remainder of this secnon Coordinate �nnth City staff pnor to acrivat�ng the bypass pipmg There are two exisbng 12" tapp�ng ports w�th blind flanges on the 20" AC pipe at this locanon The Contractor shall use these exisring ports on the AC pipe to install a line stop and bypass pipe The taps were previously used for a line stop and bypass in 2005 and have l�nestop discs below the blind flange During dry weather, the hydraulic grade line at this locarion �s above the top of the pipe by approximately 3 to 5 feet Line stop insert�on through the 12" flanged access port shall be performed by a specialty contractor The Contractor shall submit the qualificahons and references of the spec�alty subcontractor for rev�ew by the C�ty The Crty reserves the nght to re�ect the subcontractor based on lack of experience or poor references The temporary bypass pipe shall be 18" diameter and restrained �oint The temporary p�pe shall extend ' from the port and connect to the existing 20" HDPE flange approximately 50' south The pipe shall be supported and t�ed-off to prevent flotarion Install a single combmat�on 2" combination air valve at the h�gh point along the pipe � ' � ' The Contractor shall actuate three (3) ex�sting 20" gate valves to acnvate the bypass so that flow from the 20" AC main enters the bypass pipe and discharges mto the 16" siphon main that crosses under the Puget Sound to Sewage Pump Starion CE-1 The Owner will show the Contractor the location of these valves Upon complerion of the bypass, these valves shall be actuated again back to the pre-construcnon settings The temporary bypass system may be removed only after all connecnons have been made to the new p�pe and the 20" AC p�pe has been dra�ned and abandoned m-place The Contractor shall provide a submittal which includes - Technical data sheets for all materials and appurtenances (� e pipe, fittings, air relief valve, line stop equipment, restramts) - Layout of the bypass system, �nclud�ng connecnons, method of restraint, fithngs, locat�on of air valve - Experience and qualificarions of proposed linestop subcontractor � 7-17.3[2) Connechon at Stat�on 30+82 (NEW SECTION) ' Excavate and expose the exishng AC pipe to layout the pipe and fitrings to make the connect�on between the new sewer main and the exishng pipe as shown on Sheet D2 of the Plans The layout d�mensions shown on the Plans are approximate and require field ver�ficanon Cut, remove and d�spose of AC pipe as ' needed to make connection Install the fithngs and piping to make the connecrion between the new and exisnng pipe All fithngs shall be restrained Any modificarions to the fittings used for the connecrion as shown m the Plans requ�re written approval from the Owner � Ensure all sewage from existing pipe �s contained and controlled in accordance wrth Sectaon 7-08 3(1)D ntled Control of Water ' CrlyafBremerton Eastsrde Beach Mam Replacement March 2013 SP-67 ' ' � 7-17.3(3) Connection at Stahon 1+00 (NEW SECTION) The connection at Stanon 30+82 must be made pr�or to starhng this connection work Making the connecnon between the new and exisnng pip�ng at this locarion requ�res temporarily stoppmg both the upstream and downstream flow Insert an inflatable plug �n the MH immediately upstream of the piping so that upstream flow �s stopped pr�or to disconnecring the exishng p�p�ng (Note that the existing 20" gate valve immediately upstream of this locat�on is unrestrained and cannot be used for flow isolation ) The upstream MH is located on the Eastside Treatment Plant site and will be located m the field by the Owner for the Contractor The invert is approximately 20' below grade and the pipe to be plugged is 20" diameter with a maximum upstream pressure of approx�mately 8 psi when flow �s held After the upstream flow has been stopped, �solate the downstream sect�on of pipe using a linestop through a 12" access port located on the beach Once upstream flow is stopped, the Contractor shall be able to safely remove the blind flange over the 12" access port on the beach durmg dry weather and install the linestop assembly `nnthout a sewage overflow In order to mmtmize the time of the linestop usage, install a transinon coupl�ng from AC to DI pipe and a DI spool w�th restrained mechanical �oint cap as shown in Detail5 on Sheet D3, the linestop could then be removed The upstream and downstream flow stoppage �n order to make the connechons shall be accomplished dunng dry weather, not exceed 72 hours in duration, and not go over a weekend Following is a proposed work sequence for accomplish�ng the connecrion work at this locarion 1) Install new sewer piping to Stanon 1+00 �n preparanon to make the connection This work is descnbed in other secrions of the Contract Documents 2) Expose the exist�ng 20" gate valve and piping on the slope, including removal of the rock wall as needed to make the connechon 3) Obtain field measurements as needed to determine laymg length of new pip�ng and fittings for the 4) 5) 6) 7) connecrion Start flow stoppage (72 hours maximum duranon) a Contractor to insert inflatable plug at upstream manhole to stop upstream flow, b Contractor to insert l�ne stop and install MJ cap to stop downstream flow Remove secnon of exist�ng p�pe on slope and make connecnon between new and exist�ng pipe Ensure all fithngs are restra�ned Ensure all sewage from exisnng pipe is contained and controlled in accordance �nnth Secrion 7-08 3(1)D titled Control of Water Place new pipe online Remove upstream plug Plug AC pipe remaining on beach, dispose of removed secbons of AC pipe, backfill trench and restore rock wall, slope, and beach ' � � � ' � � � LJ � ' ' 7-17.3(4) Connection at Station 5+35 — Lent Landing (NEW SECTION) This connecrion can only be made after the connect�ons at StaUon 1+00 and Stanon 30+82 have been made and sewage is flowing through the new pipe Malcmg the connecrion between the new sewer piping and the ex�snng p�ping at this locat�on requires temporar�ly holding the upstream flow from the s�de sewer (14" cast iron) Install an �nflatable plug m the MH upstream (in Lent Landing parlang lot) of the connecUon to stop upstream flow, flow will back up and flow through an alternate route down to the new beach sewer Restdual flow from the downstream pipe 20" AC may be present when the exishng pipe is cut, therefore the Contractor shall conta�n and control any sewage in accordance `nnth Section 7-08 3(1)D hded Control of Water Ctty of Bremerton Eastside Beach Marn Replacement March 2013 SP - 68 , , � ' � �� 1 1 ' , r ' ' ' a ' � ' ' LJ � � 1 � ' Following is a proposed work sequence for accompl�shing the connecrion work at this locarion 1) Pothole/expose exisnng 20" ma�n, wye fithng, and 14" cast iron pipe to obtain measurements for layout of new pipmg as shown m the Plans at that locat�on 2) Install new 24" HDPE tee on new mam, along with fittmgs and 14" gate valve NOTE Thts work needs to be completed prior to mak►ng the connect�on atStat►on 1+00 and placingtlow �n the new p�pe 3) Start flow stoppage (72 hours max�mum duranon) a Contractor to �nsert inflatable plug at upstream manhole to stop upstream flow and flow will backup into ad�acent bas�n, the Crty v►nll show the Contractor in the field the locarion of the upstream manhole 4) Cut the exisring 14" cast iron main to make connect�on Provide means to dra�n and control residual sewage in the mam 5) Install new pipe and fitfings to make connecbon 6) Place new p�pe online Open gate valve at the new main and remove upstream �nflatable plug 7) Plug/cap ex�sring pipe as needed � 8) Set valve can and restore the beach 7-17.3(5) Connection at Station 13+87 — Rip Tide Condominium (NEW SECTION) Th�s connecrion can only be made after the connecrions at Starion 1+00 and Stat�on 30+82 have been made and the 24" p�pe is operanonal Malung the connection between the new sewer piping and the existing pip�ng at this locataon requires temporarily holding the upstream flow from the side sewer (8" cast �ron) Install an �nflatable plug �n the MH upstream of the connecrion to stop upstream flow The MH is located at the top of the slope �n the Rip Tide Condomimum complex Provide a means to pump the sewage that connnues to drain �nto this MH to an upstream locarion on Lebo Blvd which the Owner will identify Pump shall be able to pump min►mum 75 gpm to an elevahon of 75 feet, eshmated hose length = 300 feet to pump to MH on Lebo Blvd Res�dual flow from the downstream pipe (20" AC) may be present when the 8" lateral pipe �s cut, therefore the Contractor shall contain and control any sewage �n accordance with Sect�on 7-08 3(1)D ritled Control of Water Following is a proposed work sequence for accomplishmg the connecnon work at this locahon 1) Pothole/expose ex�sring 20" main and 8" cast �ron pipe to obtain measurements for layout of new pip�ng as shown in the Plans at that locat�on 2) Install new 24" x 8" HDPE tee on new main, along with 8" gate valve NOTE Th�s work needs to be completed pnor to maMng the connect►on at Stadon 1+00 and plac►ng flow in the new pipe 3) Start flow stoppage (72 hours maximum duranon) and pumping at upstream MH Submit a plan for bypassing flow from this MH to an upstream locarion 4) Cut the eanst�ng 8" cast iron mam to make connection Provide means to dra�n and control residual sewage in the main 5) Install new pipe and fithngs to make connechon 6) Place new p�pe onlme Open gate valve at the new main and remove upstream inflatable plug 7) Plug/cap existing pipe as needed 8) Set valve can and restore the beach 7 Air Release Valves (NEW SECTION) Install air release valve assembly, including connection to main, fitrings, 4" gate valve, 2" HDPE p�pe, post, 2" brass gate valve, and air release valve m accordance with Detail in the Plans Connect�on at the new Cny of Bremerton Eastside Beach Marn Replacement March 2013 SP - 69 , ' mam, whether a tappmg saddle or fused HDPE connection, shall be done before putting sewage ►nto the new ma�n 4" Gate valves shall be non-rising stem, fusion-epoxy bonded coated with 316 SS bolts Mueller, M&H, Clow, AVK or equal A�r Release Valve shall be APCO/Dezurik Series 400 w�th SS body The connecrion to the HDPE ma�n shall be 4" HDPE Alternahvely, the Contractor may use a Tappmg Saddle for HDPE pipe The Tapping Saddle shall be 304 Stamless Steel �nnth 316 SS hardware, Romac, JCM Industries, or equal 7-17.4 Measurement Delete the second paragraph and supplement this section with the following text There shall be no measurement for the lump sum b�d rtems "24-inch Sewer Pipe", "Temporary Bypass Pumping System', "Connection to Existing Pip�ng at Station 30+82", "Connecrion to Exisring P�ptng at Stat�on 1+00", "Connechon to Exisnng Piping at Station 5+35", "Connection to Ex�shng Piping at Stahon 13+87", "Air Release Valves" L' ' , ' L� � � � 7-17.5 Payment Delete this section and replace with the follo�nnng text "24-inch Sewer Pipe", lump sum "Temporary Bypass Pumping System", lump sum "Connect�on to Existing Piping at Station 30+82", lump sum "Connection to Ex�sting Piping at Starion 1+00", lump sum "Connecnon to Existing Piping at Stanon 5+35", lump sum "Connection to Existing Pip�ng at Stat�on 13+87", lump sum "Air Release Valves", lump sum Payment for the bid rtem "24-mch Sewer Pipe", lump sum, includes the complete cost of �nstalled 24" HDPE sewer pipe from Station 1+00 to 30+82, includmg furnishing pipe, pipe welding, removmg intenor weld bead, trench excavahon, pipe bedding, installmg pipe to the required line and grade, test�ng pipe, backfilhng and compacting trench, and restor�ng the beach The lump sum pr�ce shall include any �n-line fitdngs at the connechon pomts, all connections (butt-fuse welded, flanges, electrofuston), IocaUng wire, demolirion, handling, and disposal of AC pipe required to install new pipe, plugging exishng pipe, control of water and any other work required to provide a complete, pressure tested, and operable 24-inch sewer main to the required line and grade from Stahon 1+00 to Stabon 30+82 ALL other pro�ect WORK that �s not descnbed in other b�d ttems, shall be mcluded �n th�s bid �tem �n order to prov►de a complete, operable, fully funct�on►ng new p�ping system as clescnbed rn the Contract Documents C:ty of Bremerton Easts:de Beach Mam Replacement March 2013 SP-70 � � ' � � , , ' ' � � , ' ' Payment for the bid item, "Temporary Bypass Pumping System", lump sum, shall include the complete cost to mstall a fully operable temporary bypass pump�ng system at Stat�on 30+82 as shown on the Plans, including the cost to install and operate the line stop, earthwork, piping, connections, a�r valve, restramt and anb- flotation devices, operat�ng valves, ma�ntaming bypass, and removing bypass upon compleUon of the Work ' , , ' � Payment for the b�d ►tem, "Connecrion to Exishng Piping at Stat�on 30+82", lump sum, shall include the complete cost to make the connecdon between the new 24" HDPE pipe and the exisnng HDPE pipe at Station 30+82, including excavaUng and expos�ng the exisnng pipe, fabncating and installing new fimngs, cuthng and abatement associated w�th exisring AC pipe, mak�ng the connechons, control of water, operating valves as required, backfilling, restonng the beach, and other work as described m the contract documents to make a complete and funchomng connechon between the exisbng and new pipe at Stat�on 30+82 Payment for the bid rtem, "Connechon to Exisbng Pip�ng at StaUon 1+00", lump sum, shall mclude the complete cost to make the connectaon between the new 24" HDPE pipe and the exisUng pipe at Station 1+00 as descnbed in the Contract Documents, mcluding excavat�ng and expos�ng the ex�snng pipe, removing and rebuilding the rock wall, fabricanng and installing new fitdngs, inserhng lmestop and holding/bypassing flow, cuthng and abatement associated v►nth exisUng AC pipe, control of water, backfill�ng, restonng the beach, and other work as descnbed �n the contract documents to make a complete and functiomng connechon between the exisbng and new pipe at Stabon 1+00 Payment for the bid rtem, "Connechon to Exisring P�ping at Stataon 5+35", lump sum, shall include the , complete cost to make the connechon between the new 24" HDPE p�pe and the ex�snng HDPE p►pe at Station 5+35 as described in the Contract Documents, mclud�ng excavaring and exposing the existing pipe, removing and rebuildmg the rock wall, fabncanng and installing new fittings, inserhng inflatable plug mserhng Imestop and holding/bypassing flow, cutting and abatement associated �nnth existing AC pipe, control of a water, backfill�ng, restor�ng the beach, and other work as described in the contract documents to make a complete and funchomng connection between the exisnng and new pipe at Starion 5+35 ' Payment for the bid rtem, "Connechon to Exisnng Pipmg at Starion 13+87", lump sum, shall mclude the complete cost to make the connecdon between the new 24" HDPE p�pe and the exist�ng HDPE p�pe at Station 13+87 as described �n the Contract Documents, including excavahng and exposmg the exishng pipe, fabncahng and installing new fitdngs, mserhng mflatable plug and hold�ng flow, bypass pumpmg, cuthng and � abatement associated with ex�sring AC p�pe, control of water, backfilling, restonng the beach, and other work as descnbed m the contract documents to make a complete and funchomng connechon between the eaashng and new pipe at Stahon 13+87 ' � ' ' , Paytnent for the b�d �tem "Air Release Valves", lump sum, shall �nclude the complete cost to install the a�r release valve assembly per the detail and this secrion, mcluding tap and fithngs for connechon to the 24" ma�n, pipe, fithngs, valves, riser pipe, supports, and any other work to provide a fully operable and complete air relief valve assembly as shown in the Contract Plans ' Crty of Bremerton Eastsrde Beach Main Replacement END OF DIVISION 7 March 2013 SP-71 ' ' DIVISION 8 - MISCELLANEOUS CONSTRUCTION 8-01 8-01.3 �*****� EROSION CONTROL Construction Requirements Delete this section and replace with the following In an effort to prevent, control, and stop water pollunon and erosion �nnthin the pro�ect, thereby protecring the work, nearby land, streams, and other bodies of water, the Contractor shall perform all work in strict accordance with all Federal, State, and local laws and regulahons governing waters of the State, as well as perm�ts acquired for the pro�ect Because the pro�ect work disturbs less than 1 acre, an NDPES construction permrt is not required No turbid�ty or pH monrtor�ng is required Comply v►nth the perm�tting agency requirements as descnbed in Section 1-07 30 City of Bremerton Erosion and Sed►mentat�on Control Standard Details are included �n Appendix C � The Contractor shall, in addihon to the requirements of the permittmg agencies and other legal requirements, comply at all times wrth the follo�nnng • A smgle indiv�dual shall be designated v►nth respons�bil�ty for implemenhng, mon�tonng and maintaimng the temporary erosion control measures This indrvidual shall be a Cerhfied Erosion and Sediment Control Lead (CESCL) CESCL cerhficarion shall be obtained and submitted to the C�ty pnor to begmmng excavanon • Affected streets shall be swept daily � On the beach, restore all trenches and remove all stockpiles prior to inundation by hdal waters each day At no hme is equipment perm�tted in the water � Cr�t�cal drainage features and storm sewers receiv�ng runoff from exposed earth surfaces shall be protected from siltation by temporary gravel berms or check dams made of crushed surfacing top course mater�al • Off the beach, stockpiled soil mater�als shall be protected from erosion at the end of each work�ng day by covenng the piles w�th impervious sheenng, containing the edges w�th a one-foot-h�gh gravel berm of crushed surfacing top course material or other means approved by the Engmeer Soil stockp�les and other areas shall be dampened as need to mimmize dust generahon • All water removed from the trench shall be filtered and sediment removed pnor to d�scharge to the environment Direct discharge to the beach is not permitted • No drainage systems shall be blocked for more than one work�ng day or during per�ods of runoff v�nthout temporary dra�nage bypass • Gravel construcbon entrances shall be implemented as d�rected by the Engineer �n areas where construction equipment travels off-road • At the conclusion of construcrion operahons, the Contractor shall remove and legally dispose of all sheetmg, soil and other materials that have become contam�nated with fuels and oils Crty of Bremerton Eastsrde Beach Ma�n Replacement March 2013 SP-72 , , � ' ' � C I � O a � ' ' � , � , ' , ' ' � � � � ' , a , ' ' ' , � � ' ' • Insert filter-fabric catch basin inserts into affected catch basins for captur�ng sediment Clean after every storm event and as directed by the Engineer Remove upon conclus�on of the pro�ec�t. • Mamta►n the cleanliness of roadways and walkways affected by construcrion operarions Debris and rubbish shall not be perm�tted to accumulate and all premises shall be maintamed in a neat and workmanlike cond�hon In the event that the Contractor fa�ls to conform to these requirements, the Owner shall have the nght to have the work done by others and the cost �nnll be deducted from the monies due the Contractor 8-01.3(1)A Submittals Supplement this section with the follow►ng The Contractor shall submit a TESC plan mdicanng the following • Method for removing sediment from water pumped from the trench pnor to discharg�ng to the env�ronment � BMPs �n the staging area, includ�ng intent and method for cleaning staging area 8-01.4 Measurement �*****� There is no measurement 8-01.5 Payment �*****� Payment for temporary water pollurion, eros�on, and sed�mentahon control shall be �ncidental to other bid rtems 8-05 BEACH MITIGATION AND CLEANUP (NEW SECTION) ���r*�*� 8-05.1 Description This work consists of removing des�gnated rtems, pnmanly consisring of concrete rubble, from the beach as requested by the Department of Fish and Wildlife in order to improve hab�tat for spawmng fish 8 Materials Th�s sechon is not used 8-05.3 Construction Requirements Cety of Bremerton Easts�de Beach Marn Replacement March 2013 SP - 73 . Woody debns and branches in the trench path and that mterfere w�th construchon equipment shall be cut and placed agamst the toe of bank. Perform work for beach mirigation and cleanup as descnbed in the follo�nnng table and as further descr�bed in the report ritled "Beach Mingation and Cleanup" in Appendix C Each rtem shall be removed from the beach The Contractor is responsible for methods of hauling and d�sposal The stabon locat�ons are approx�mate Crty staff will idenrify each locarion m the field using wooden stakes and flags An est�mated amount of each rtem is indicated in the table Small, miscellaneous rubble and debns have not been included in the report table Remove these rtems on the beach as directed by the Owner Submrt informarion on the disposal locabon and scale owner contact mformat►on, mcluding date of last scale calibrabon BEACH MITIGATION AND CLEANUP TABLE Item # APPROX. DESCRIPTION OF ITEM TO BE ESTIMATED VOLUME OR STATION REMOVED SURFACE AREA OF ITEM 00 3+50 Single piece of concrete debr�s on surface 0 5 CY 01 3+00 Excavate and remove bur�ed concrete 1 CY debns 02 2+50 Concrete slab debns Do not remove back 150 SF of concrete surface into slope area 03 1+00 Place quarry spall from beach back onto 1000 SF of concrete surface slope above Sta 1+00 area 04 5+25 Wood piles on beach Remove in enrirety 15 piles, depth unknown or cut off 2' below grade 05 6+00 Metal Sheet 6' x 12' x �iz" thick 06 6+50 to 7+00 Abandoned concrete bulkhead along east 750 SF side of estuary, �n sechons 07 8+00 Abandoned concrete blockwall 5' H x 12' long 08 17+50 Duchle p�pe,12" or 8" 3 stzcks 09 20+50 Concrete fence post based and wheel Estimated 3 10 22+30 Abandoned retammg wall, vertical and 250 SF hor�zontal 11 28+00 CMP Culvert 24" to bulkhead Approx 10' of 24" CMP 12 30+50 Miscellaneous CMU blocks and concrete Approx 15 CY debns Crty of Bremerton March 2013 Eastsrde Beach Marrr Replacement SP - 74 � � � , � � � ' , � ' � ' 1 ' ' ' ' ' 8-05.4 Measurement "Beach Mrt�gat�on and Cleanup" shall be measured by the ton of debris removed from the beach, hauled, and disposed of at an off-srte locanon to be determined by the Contractor Measurement for tonnage shall be based on actual printed and signed weight slips from cal�brated scales 8-05.5 Payment Payment for the bid item "Beach MiUganon and Cleanup", per ton, shall be all labor, equipment, and mater�als to remove the rtems from the beach as descnbed in this sechon and in Appendix C, including removal, haul, and disposal of rtems, and surface restorabon as required Cleanng and removal of branches, limbs and other foliage in order to perform the removal is incidental to this bid rtem END OF DIVISION 8 Crty of Bremerton Easlsrde Beoch Mam Replacement March 2013 SP-75 � � DIVISION 9 - MATERIALS 9-05 DRAINAGE STRUCTURES, CULVERTS, AND CONDUITS 9-05 23 Descripdon �*****� Revise the 2nd paragraph as follows Unless noted otherwise, all HDPE pipe sizes are based on Iron P�pe Size (IPS) The dimens�on rario (DR) for all HDPE p�pe shall be 21 HDPE fithngs, where called for use on the pro�ect, shall be DR 17 or thicker- walled Where required, provide transrtion between IPS-s�ze HDPE pipe/fithngs and DIPS size pipe/fittings Supplement this Section with the following text Flange backup nngs shall be stainless steel All nuts, bolts, and washers shall be 304 SS or 316 SS All flanged HDPE fithngs shall be installed and torqued in accordance �nnth Plasric Pipe Insritute document tided Bolt Torque for Polyethylene Flanged Joints TN-38 Quly 2011) HDPE PIPE REFERENCES• P�p�p dimensions and manLfact�ring rg�urements. ASTM F 714-05 Standard Spec�ficanon for Polyethylene (PE) Pipe (SDR-PR) Based on Outside Diameter Th�s standard is used for most large diameter HDPE pipe (4" to 63") applicahons other than gas pipe ASTM D 2513-05 Standard Specificarion for Thermoplastic Gas Pressure P�pe, Tubing and Fithngs Polyethylene pipe and other plashc for natural gas d�stnburion are descnbed in great detail in this standard ASTM D 3035-03a Standard Specificanon for Polyethylene (PE) Plastic P�pe (DR-PR) Based on Controlled Outside D�ameter Most HDPE water tubing (1/2 inch to 3") is made to the dimensions in th�s standard While pipe sizes up to 24" are provided, very l�ttle large diameter pipe is made to this standard Installahon Standards. ASTM D 2321-05 Standard Pracrice for Underground Installarion of Thermoplashc Pipe for Sewers and Other Gravrty Flow Applications ASTM D 2774-04 Standard Pracfice for Underground Installarion of Thermoplasnc Pressure Piping ASTM F 1962 Standard Guide for Use of Maxi-Horizontal Directional Drilling for Placement of Polyethylene Pipe or Conduit under Obstacles, Includ�ng Rrver Crossings ASTM F 585-94 Standard Pracnce for Insert�on of Flexible Polyethylene Pipe into Exisring Sewers ' ' ' , ' � ��' � LJ � a t LJ ' � ' ' C:ty of Bremerton March 2413 , Eastsule Beach Ma:n Replacement SP - 76 ' , , 1 , , ' 1 ' ' � � ' ' ' ' ' 1 ' Crry of Bremerton Easts:de Beach Marn Replacement L_ 1 ANSI/AWWA C 901-2005 Polyethylene Pressure P�pe and Tubmg, 5 in (13 mm) Through 3 �n (76 mm) for Water Services ANSI/AWWA C 906-2006 Polyethylene Pipe and F�thngs, 4 in (100 mm) Through 63 In (1,575 mm) for Water D�stnbubon �gJ�ng SLndards. ASTM F 2620 - Standard Prachce for Heat Fus�on of Polyethylene Pipe and Fithngs ASTM D 2657 - Standard Prachce of Heat Fusion Jommg of Polyolefin Pipe and F�ttings ASTM F 1290 - Standard Prachce for Electrofusion Joming Polyolefin Pipe and F�thngs Frtt�ng Stand�rds ASTM D 3261 Standard Spec�ficarion for Butt Heat Fusion Polyethylene (PE) Plast►c F�thngs for Butt Fusion Polyethylene (PE) Plasric F�tdngs for Polyethylene (PE) Plashc P�pe and Tubing ASTM F 1055 Standard Specificahon for Electrofusion Fithngs for Outs�de D�ameter Controlled Polyethylene P�pe and Tub�ng END OF DIVISION 9 Mnrch 2013 SP-77 1 1 THIS PAGE LEFT INTENTIONALLY BLANK 1 �I �� ' ' , � � � � t ' 1 � � ' 1 � � � � � APPENDIX A ,� KITSAP COUNTY PREVAILING WAGE � � � � r � .� � � ,� � , � s � � _� RATES 1 � THIS PAGE LEFT INTENTIONALLY BLANK � � � �� �� � � ��, r-1 � � � � � .� �l �� �1 1-1 Mips //fortress wa gov/lrv/wagelookup/prvWagelookup aspx � � State of Washington Department of Labor & Industnes Prevailing Wage Sectlon Tetephone 360 902 5335 PO Box 44540, Olympia, WA 98504 4540 ,1 Washington State Prevading Waqe � The PREVAILING WAGES llsted here irxlude both the hourly wage rate and the houtly rate of fAnge benefitr On public works projects, worker's wage and benefit rates must add to not less than this toW l A brief description of overtime calculahon reqinrements are provided on the Beneht Code Key Journey Level Preva�ling Wage Rates ior the Effechve Date 3/152013 � � `-J �� �' � � � �� � �� � � u � C� � 1 of 5 3/15/2013 11 15 AN � � w .� � �ii. � � � ,�iii- � � ,r_f � ir� � � � t� �� .� � � o � OA __ i ... �..... M t� 3 � � � � �i�� � ������������� � ����������������������������� �������� �� N � � E i � ' � � - -- - - �- �- � - - --fi- - - - -� -- - M r � , � � E a NI NI NI � NI NI �I �I �I �I NI �I �I � �I NI NI NI �I NI NI� NI NI AI NI� �I �I NI{ �I �I NI NI �I �I NI NI NI �I �I NI NI �I NI �I' NI �I �I � NI NI NI NI � NI NI NI NI� -� �� -� �I �I �I �I #I� �I� �I �I �I �I �I �J� �I �I, �I �I �I �I �I �I � � 3 � � � � � { � � ^��" �I �I �I �I �I �I �I� �I! �I �I �I �I �I �I �I� �I �I �I �li �I �I� �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I� �I � �I �I �I � �I �I �I �I� �I � �I �I �I �I � �I �I �I �I� �I � �I �I � �1 � � � � � ` � aG a < < < < � � � I I I I I I I �k I� �I, �I � �I �I �I �I b�A I � � I € €€ 1I1 � �1 �O � IR Bf Bf B1 a0 � a0 uf S1 � ' �1 Sf a0 vl� IR �� B1 aO Sf a0 � B�1 �1 �1 ����f S S O� Bf a0 P R P N N �f W Y ul �1 ��1� P N � P P P F P � P N N F iG � 1� � P QP 7 P � x x���x�x��3Exx�����x������3Ex�3E�x�����^�3€���3ER���s����x�������;����a���3�3E��������� ���� � � ' � ' � 3 w , � �' � � � � � � ' � � E� � ' € � � a n � � n ~ � � s� � ' ` a � v � '� i 8� _ � g IY � i3 i4 i4 i� 14 e � = � � a t" o � a § ' � 8 8 8 8 8 8 8 8� m r� m S � � I � F� � I g $�ss�Ra�a , o ��� � r� s '� „u � 3 u b S'o 'o S o'o S a a �� � ' � � � E�� ` � d � � u� $ � � f: �' 1 � E �� E a a � y� fi 5 0 �3 � � � �m�$ E � � � � � � � � .� � �g �' r � �� ��q � 3 �� e �� � I �a� ��a33�;��� �� r� i Q 3� 3��s� � q � 9� � 1 � � °'� 'a` 'a` a 'a�� 'a` 91 �a a e `� S � �a�` �`p 9 � � '" � � � � � g 8: � 'o y 'o y'ne � 7 ��� c� �.� � E c 3€a s 3 c � S5 � �,�pF'� � �° °� r r � � �' i°° `� � I e� 'ti : 8� n$ � n� n � a u Y c a N g` � E �� o � Q Q � 9 � � � �' & ` ^' � 9 �'n E E E E E E E E E � � � � € � ' � � � PL � � ~ � � ~ � ~ ° N 3 � °� c g q �g ° 8' � � E y �— 9� 3 3 3 3 3 3 3 3 u§ 8��' 9 W b v r t O l� E� E o oQ � y 3 °� � �j q q � � 'S p � � et �i ' �` $ N E � �' � ,��. .��1 � o 0 0 0 o E 9 � S ! � � e � a LL �i > > � F � H S ��' � S u m � i� i` i` i� ��� i� i� t� i� $ 5 �� s 5 c q E� `a w. � F �L o N v �� E $� � � � S d 5'. L a a y � E ��.�..,-€ ��€�`� � y a��.s g $ S 9 su�.o3�s�333'3�t��3'3 E 3 m I "�_ °� � ��'S�o n > 3����� ��� o � E E „I o � ` "` S y u u 8� g i L m `u m E n �� E' E' �' S i � a�a�s�sa��Y s`Y°�av������� ��gg�����Y`���� ������ y �� ,a �t�= � � .� ��`� $5� 8 s S S S s�s 8 8 8 8 � � & & 'z rc o''e�8 Si Si �° �° � � � � � F � �° � � � � � � � � � � � � f�'- � i'- -��' �'- � 3 � � 3 '3 � S.� � � � � �" � � S�� �` m � 6 3{3 3E�4s 3 3 � �r'�'I�� � i � I i i a n a a a a a a c n a c '' n a���� � � �n3nnn�i�����n�3��3���3na Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y � € � € 1 � �°�° « ' � o� €`w�d € _ E �� � w w w �a� � � � ; � Q€ a Y Y� � a Y � w � N ,� Kitup � K1nap KI[sap Kitrep � KiWp ,Nitsap tKitsap Nltsap � � I(Itsap ._.._. � NltsaP . �Kitsep � Kitsap � � Nltsap Kltsap Kitsap K�trap K1hap � K1traP _ _ � Nitsap Kitrep Kitsap KlCSep € K�� � Nitsap Kltsap i(itsap � RltsaP ._.. Kitsap Nltsep � Kitsap � Kitsap �` 1(itseA I(itsap KiGSap Nltsap '1,. Kitsap � , � K' � KitSap Kittap Nltsap � Kitsap t Kitsap � Kitsap KiGSap Kittap K1LSep Kitsap Kitsap Ki[sap Kltsap S Kitsap � K �<..._�.. ° .....P_ ....... Kitsap W K1hap � Kltsap Kltrap Kitsap Kibap K1[sap � KitseP _......_ Kltsap � Kitsap Kitsa Kitsap � KiCSap Ki[sap Kitsap =Kitsap `Kitsep � � KitsaP _.._.._.. Kitsap KtCCap KiGSap jK1[sap Kitsep �l Kitsap NiGSap =Kitsap 'Ki[sap � � 3 of 5 Power Equi�nent Operators htSps //fortress wa gov/lru/wagelookup/prvWagelookup aspx f Ganes 10070� Through 199 Tore or 15U of hoom (indudl� Jlb 552.74� IA 3C � 8P wIN aanchmmts�, Overhead, bridge type 100 tom and rner Tower I aare up W 175 In helghG hase m 600m Ganes Z(p Tore To 30D Tore, Or 25Q Of Boom (1�ludi� Jib W1th $53 31 7A 3C BP IAttachments) IGanes 45 Tore Throu� 99 Tore Under 15Q Of Boom (IncWding Jib $52.19 7A 3C BP Wt[h Attachments) . �� � � Cranes A frame 10 Tom And Under $48 92 7A 3C 8P i �.._ _�.�......_ _ — �_.... � � Cranes frktbn 10p Tons Through 199 7ois �� � 553 37 7A � � 3C � 8P � Gaires Frictbn Over 1f1D Tore Y 553 87` � 3� BP �Ganes Over 300 Tons Or .300' Of Boom (tnduding J(b With 553 87 7A 3C � Ba �_ Attachments) Y � �� i IGanes Throu� 19 Tore Wi[h At[achment5 A freme Over 10 Tom 557 ?B m 7A 3C BP _ _ ._.... — _._.. — __�__..�_____ — ,� Crusher 551 7fM 7A 3C BP —......_____�_ .._.._.. m ,_____._.._ _._..__ Deck Englrreer/deck Wi�hes (power) � �� � 551 7IR 7A �� 3C � 8P : IDeMcla On BullM Work 552 19 7A 3C � BP # Doier Quad 9 MD 41 D10 and Over � $SZ79 j[ 3C � Oozers DA & Under S51 iB 7A 3C BP I Orill 00.ers Auger 7ype Truck Or Cra�re Mount $51 28 7A 3C 8i ]DrilUngMachire $517fk 7A 3C � � Elevatnr Md Man lift Permanent Md Shaft Type $48 92 7A 3C � �Finhhing Machine Bidwell Md Gameca & Slm ilar Equ9qnent $51 7(k 7A �C BP � �Forldift 30001bs And Over With AttachmerKS 551 28� 7A 3C 8P iForklffts Under3Q00Lbs WINA[tachmmts $48.92� 7A 3C 3 BP �� Grade E�Ineer Using Blue Prints, Cut Sheetr. Etc $�S1 �$ 3C m _� _______ ...._ __W__.__ �kerhtakeman _ _ _ _ .._.. � ._ �A ..._�..._. � _ _ � � Guardrail Punch � v S51 7l1� � 7A 3C BP S GuerdrellPunch/Auger 551 7A 3C BP Hard 7ail EiM Dump Articulatlng Of( Ibad EqWpment 45 Yards & $52 19� 7A 3C 8P a�. Hard Tail End Wmp Articuleti� OH road Epuip U�Mer 45 Yerds 551 7 3C 8P Florizontal/directlonel DriLL Lowhor � S51 28 7A 3 C BP � Fiorizontal/ Drill Operam $51 7A 3C 8G ____W___ _.._,_ �__ �. r.____W__ _.._ _...._ _ ._..__ . __ Hydredits/hoom Trucks Over 10 Tore 551 28 jA 3C 8P �� ' � � Hy�aUfts/boom Trucks, 10 Toro Md Under $48 92 7A 3C BP : � Loader, derhead 8 Yards & Over�� ��� �� � $52 7 7A ��3C BP � Lnader, derhead, b Yards But Not Intludl�g 8 Yards $52.19 7A 3C 8P Waders O+erhead Under 6 Yerds $51 �A � 8P � lo aders, Plent F ee d S51 7A 3C 8P � lnaders Elevating lype Belt � ^ $51 28 7A �• ~ 7C 8P � � Locomotives, All $57 7A 3C 8P Ma[erlal7Farnier Devke $51 7� 3C ¢Q � ���� Mechanfa, All (leadmen $0 50 Per Hour Over Mechanit) � $4 74 7A 3C _ Mbcers. Asphalt Plent 551 R1€ 7A 7C 8P �MOtor PaVOI Grader Non finishfng 551 2BE 7A 3C 8P Momr PaVOI Graders Finishing 552 19 7A 3C 8P ' "� Mucking Machl� Mote, 7un�1 Drill. Boring, Road Header And/or $52.19 7A 3C BP Shleld ` � 011 Distributnrs, Blower DIsW Wtbn 9 Mulch Seeding OperaWr $48 jA 3C ,� � Outslde Hofm (elevatws Md ManllRs), Alr Tuggers,svato $51 28� 7A 3C � 8P � � ` Overhead Brldge Type Crare 20 Tore Through M Tons $57 Z 3C W 8P '� Overhead, &ldge Type 10D To�s And der $52.74 7A 3C BP Overhead Bridge Type 6 Tora Thrau� 99 Tore $4 19 7A 3C 8P � Pavement &eaker $48 7A 3C 8P Plle Drlver (other Then Crane lAount) $51 7A 3C 8P Plant 011er Asphalt, Crusher 557 7B 7A 3C 8P ( � Postlrole Dlgger Mechanlcal $48 7A 3C 8P � Pov.er Plent 548. 7A 3C 8V � Pumps Water $4892 jA 3S � � Q uad 9. Hd 41 D70 And Ov $Sl 1 7A 3C BP W i Quidc Tovrer No Cab Undcr 100 Feet In Hetght Based 7o Boom v � $48 �7A 3C � 8P � IOemote CoMrol Operatar On Ruh6er Tired Earth Moving Equtpment $SL 79 7A 3C 8P i Rigger Ard Bellman 548.92 7A 3C 8P Rollagon 552 79 7A 3C BP RoUer, ONer Then Plant Mlx $48 92 7A 3C 8P fdoller, Plant Mix Or MuIN UR MateAals 551 7A 3C BP I Ibto-miU, Rom grinder 551 7A 3C BP i �_ Saws ConveOe _._... __.._. 55128___..____€__ ..............7A 3C 8P � � AU 151rovel Fxcavato , Badchoe der 30 Metric To� To 50 MeUic Tore �Shovel, Excavator, Badchoes, Tracmrs 15 To 30MeVk iom Shovel FxcavaWr,Backlwes Over50MetrlcTotuTo90MeWcTore _ a -�� ._._.�._ _ _m______.� _ 3 Shovel Fxcavator Badclroes Orer 90 MeVic Tom 1_..... ._._._____ _ _ _ _ �._ .......... � Aipform Pavers Spreader Topsider & Scree�nan u � W � � I Subgrader Trtmmer �Tower Bucket Elevatnrs �Tov.er Crane Over 1751n Height, Base To Boom ��Tawer Crane Up To 175 In Flefght Base To Boom � I haiuporters All Track Or Truck Type Trenching Machiires Truck Crane 011er/drfver 10D 70� And O+er $4 79t 7A 3C 8P 5517� 7A 3C 8P $R 74 ^ 7A ^ mm � 3C _ 8P � 553 37€ _. _.� _ .._._.. � _� � _. _.... $52 79 ��7A � � 3C 8P $52 19 7A ��� 3C �� � 8P S51 7Ik 7A 3C BP 552 3/15/2013 11 15 AM Gane �Kitsap Kihap Kitsap Kitsap �Kitsap Kitsep Kitsap Power Equlpment Operatnrs Under{qound_Sewer & Watcr Power EqylpmentQpera[ors Under,�ound Sew4r 8 Water EgWpment Operotors Undergound 5ewer & Water Power Equtpment Operators Un�ryound SeHer & Water Povrer Eauioment O{}erators U�derpround Sevner & Water Power Eguipmem Operators Un�r�ound Sewer & Water �ay Dozer � .t Plant OperaWrs mt Engineer r hlachhre (zlpper) Plant Operamr, Conc [ Remote DemoUtlon Mtps //fortress wa gov/lm/wagelookup/prvWagelookup aspx �� $51 7B 7A 3C 8P 551 7A 3C 8P $52.19 7 3C =�� � $48 92 7A 3C � 8P 551 7A � 3C + 8P 552 19E 7A � 3C 8P $48 92; 7A 3C � 8P 5517d � 3� 8P � 551 7A 3C � 8P $48 ffl 7A � ,8� $48 97, 7A 3C 8P $48 92, 7A 3C 8P $51 RM 7A 3C 8P � � $52.19 7A 3C 8P $51 7A 3C � $4H 92E 7A 3C � BP Wncre[e Pump 7Fuck Mount W1th Boom Attachment Over �Q M SS� 19 7A 3C 8P WncreteflnlshMachlne IaserSared 548. 79 � m � � Concrete Pump Mounted Or liatler High Preaure Llne Pump Pump 551 28 7A 3C 9P Hi� Pressure Concrete Puma Truck Mouirt With Boom Attnchment Up To 9m $51 70i � 7A 3C 8P � Comeyors S51 7A 3C 8P Crenes 20 To� Through M Tons W1th Attachme�rts 551 7A 3C 8P ; Crares 7DTore Throu� MTois Wi[h AttachmeMS Overhead, BAdge $51 7p 3C LL ��BP �� {� Type Gane 20 Tore Through M Tom Ganes 100Tons Through 799 Tors, Or 750' Of Boan (iixludi� Jib $S17N Z9 � 8? } Wtth .�, Cranes 711U Tons To 300 Tora, Or 25f7 Of Boom flndudi� J1b With � $53 37 7A 3C 8P Attachments) 4ares 45 Tor6 Throu� 99 Tore UrMer 15D' Of Boom (induding Jib $Sl 79 7A 3C BP Wfth Attachments) � � Ganes A freme 70 Tore Md Uider $48. 1A 3C 8P Ganes Frlctlon 100 Tore Through 799 Tore � 553 31 7� �S. .� Genes Frlctlon Over I1D Tom 553 8 TA 3C 8P � Crarks O+er 300 Tom Or 30D Of Boom (Induding Nb With $53 8 7A 3C BP Attnchments) Ganes Throud� 19 Tom With Attadimerds A frame Over 10 Tore S51 7A 3C 8P ' Derricla, On BWldl� Nbrk Dozer Quad 9, HD 41, D70 and Over Dozers D-9 & Under � __ Dr1LL 011ers Auger lype. iYuck Or Crnne Mount ____ OrllUng Machlne Elevatnr Md Man lHt Permanent Md Shaft Type Fnishing Machiire, Bidwe�ll And Gamaco & Similar EquiF Forldift 3000 Lbs AM Over With Attndime� Forld9fts Under 300D Lbs With Attachments u, z9 �c er i 551 7A 3C 8P � �� � $52.79 7A 3C 9P $52.19 7A 3C 8P $51 lA � e? _____ ____......�___�___ � � _.� — — — r S51 7A 3C 8i � y18 92E 7A 3C 3 8P nent 551 7A 3C 8P \ S57 28 7A 3C 8P � $4& 7A 3C BP $51 7A 3C 8P 548. IL � � � irailPunch S51 7A 3C �BP�� lrail Punch/AUger 557 7A 3� 8�� Tail End Dump Artkulntl� 0% Road Equipment 45 Yards & 552.19 7A 3C 8P Ta4 End Oumn Artkulatim OH road Euuipnent Under 45 Yerds S51 7A 3C 8P j ,� tal/directlonal Orill Opera `tr/boom Trucks Over 10 T� 'ts/boom Truckt, 10TOrs A Overhead 8 Yards & Over Overhead, 6 Yards But No �, Overhead Ue�der 6 Yards , Plant Feed � Elevatl� Type Belt rtNes. All 50 Per Hour Over Nitsep S51 7A 3C BP $51 7A 3C 8P ` $51 7A 3C 8P 548. 79 3S �2 � � 552 7 7A 3C 8P �t $5219 �7A����� � J 3C 8P $51 7A 3C 8P $51 7A 3C BP $51 28 7A 3C 8P � $51 7A 3C BV $51 �A 3C 8P :) $52 7 7A 3C 8P $51 7A 3C BP � SS'I 28 ___._ _ 7A _�___-... ._....�.-..7C 8P Underground Sewer & Water Motnr Patrol Graders FiMsMng 552 19 7A 3C BP � Undetground Sewer £t Water Mucki� MecMne hble Tunnel Drill Boring, Ibad Header Md/ar $52 19 7A 3C 8P � Shield Underwound Sewer & Water 011 Distrlbutnrs, Blower DlsWbution & Mulch Seeding Operamr 548 7A 3C �� Underaro�nd Sewer & Water Wtside Hofsu (elevaWrs And ManURs) Afr Tu�ers sVam _ S51 1B 7A 3C ��� BP _ � �..�..._... ______.�__... Underaround Sewer & Water Ov erhead Brldge Type Crare 20 Tons Through M Tore � 5� 5 ,., __1 .. _7�_ ....,, _ �� a _ 7C 8P m,,,,, ____.�.�.,._.��. Un�reound Sewer & Watrr O✓erhead, Brldge Type 100 To� Md Over � $52 7 �A 3C ��l _ 8? � �� � , Underground Sewer & Wacer derhead, Bridge Ty 6 Tore Through 99 Tois SSt�55�7 ��_,.���������� W� 3 C __,�,_ -,,,,, 6? _ ,I(itsap Po wer Equi�em Operators Und Se�+er & Water 1Paveme�K Breaker __ � _ ,,.,, _ _ ��„ L � _�_ � 8 P ' KiCSap Gower E ut ent O rators Under ound Sewcr & Water Plle Drlver (other Than Crare Abunt) � S51 7O �A � K��� BP � Ni[sap Power Equtpnent Operators UR�r�ound Sevrer & Water Planc Oiler Asphal4 <<��+ u� � Z � � i � , Kitsap Power E W ent O retore Under und Sewer & Water Postlwle Digger Mechanical 548.92 �A, 3C 8P Kltsap Power E ui ent O ramrs Unde ound Sewer & Water I Pb�++er Plant $48 7L TA 3C 8P Kitsap Power E W en[ O rators Under ound Sewer 8 Water Pumps Water 5'18 92� 7A 3C ' 8P Nltsap Power E ui ent O rators Un�r ound Sewer & Water Quad 9, Hd 41 D70 AiW W er T __ �____� T 552.19 jA 3C_ .................. �� Nibap Power E ui ent O rators Under ound Sewrr & Water � Quidc Tower No Cab UMer 10D Feet I n He1�t Based To Boom 548 92 �A 3C � 8? Ki[Sap Power Eauiwnen[ Ooeretors UnderBOUnd Sewer & Water Remote ConW! Operatnr On IWbber T1red Eerth Mwing EqWpmeM $52 ___ 19[ _ 7A 3C � 87 . Kitsap Power Equipnen[ Operators Underg_ound Scn er & Water �� f Ri�er And Bellman 5��� L _�� �� �? 4 of 5 � 4 3/15/2013 11 15 AM �� � �� �� ,� � �� � � r M.tps //forlress wa gov/lru/wagelookup/prvWagelookup aspx � � �� � �� � � � � � 5 of 5 3/15/2013 11 15 AM THIS PAGE LEFT INTENTIONALLY BLANK ,� � �� �� �� � ,� �� � � � � � � � � � � APPENDIX B CONSTRUCTION FORMS � THIS PAGE LEFT INTENTIONALLY BLANK ��t - i ; l(� ACCEPTANCE OF COMPENSATION & RELEASE OF ALL CLAIMS ' ; r� ' <Project Title> , �� <City Project Number> -<City Construction Contract Number> x r <COI�TTRACTOR>, hereby mdicates agreement with, and acceptance of, the final Contract Payment of �� � <$000,000>, the total Contract Pnce of <$000,000,000>, mcludmg Waslungton Sta.te sales and/or use taxes, and the final Contract Tune of <NNN Days>, as full and final compensation for all Work ( performed in connection wrth Contract Number <City Construction Contract Number>, and does hereby release the Crty of Bremerton from all clauns, liability, �demands, damages and actions of any ' kuid whatsoever, ansmg from performance of that Contract , � ' <CONTRACTOR> � 1'� ' ' : By Date• � } 4 (,�, Title � , � ,, � � � �� ' I Cert�cate of Notarv - � �� Subscnbed and sworn to before me tlus day of � _ „ �� , , 3 y I `� ` I � � I ' s ` r . � ,� l y l� . �_� � � �r � � � , � �. � , �� . , � �- �� , � �,� , , , , , . , , � _ �_� . � CITY OF BREMERTON Pro�ect Contractor Pro�ect No SHOP DRAWING SUBMITTAL Submittal No Date Resubmittal (Y/N) Pr�evious Submittal No -- To Be Com leted b the Contractor To Be Com leted b the Ci Speafication No Make Amend Item P/C Para / Dwg Copies Exceptions Corrections and Re�ected No " Reference Descn tion of Item Sub'm Taken Noted Resubmit Resubmit (") P- Partial Submittal, C- Complete Submittal Contractor, irntial by either (a) or (b), to certify the following (a) We have venfied that the matenal or equipment contamed m th�s subm�ttaf ineets all requirements speGfied or shown (no exceptions) (b) We have venfied that the matenal or equipment contained in this subm�ttal meets all reqwrements speGfied or shown, except for the folloanng dev�ations (list dewations) - - Contractors Authonzed Representative Review Remarks CorrecUons or comments made relaUve to submittals dunng this review do not relieve the contractor from Very tR�ly yours, compliance mnth the reqwrements of the drewmgs and specifica4ons This check is ony for rewew of Clty of B�emerton generel confortnance vwth the design concept of the pro�ect and general compliance v�nth the mfortnation Dept of Public Works and Utdities groen in the conVact documenta The contractor is responsible for confirtnmg and comelatmg all quantdies and dimensions, selecting fabncaUo� processes and techniques of construdion, 000rd�naUng h�s work wrth that of other trades, and performmg his work in a safe and sat�sfadory manner Pro�ect Engmeer �: • � ir►� s�� ii �e � i� ri ' i �' i�c' `:i L a� iii� �ii�i ;�i cs ;�i s , , , � �. � �� ` � ,� � 0 ,�� � � � ��� i� ,� ��� � CITY OF BREMERTON WORK CHANGE DIRECTIVE (WCD) WCD #: Date: Project Name Project #. Contractor Notice to Proceed Date• YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S) ATTACHMENT If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon wdl involve one or more of the following methods of determirnng the effect of the change(s) The Change Order wdl be executed in accordance with Section 1-04 4 of the WSDOT Standard Spec►ficat�ons, or Article 10 of the General Conditions Method of determinmg change m Contract Price ❑ Urnt Pnce ❑ Lump Sum ❑ Time & Materials ❑ Other Estimated increase (decrease) in Contract Price $ If the change involves an increase, the estimated amount is not to be exceeded without further authonzation RECOMMENDED � � By � � PAGE 1 OF 1 CONTRACTOR Method of determining change in Contract Times ❑ Contractor's Records ❑ Engineer's Records ❑ Other Estimated increase (decrease) in Contract Times Substantial Completion 0 days, Ready for final payment 0 days, If the change involves an mcrease, the estimated times are not to be exceeded without further authorization AUTHORIZED CITY OF BREMERTON By THIS PAGE LEFT INTENTIONALLY BLANK � �� � APPENDIX C �� BEACH MITIGATION PLAN � �� ,� � � � � � � �� � � �� �` � � , THIS PAGE LEFT INTENTIONALLY BLANK � � � � � � � �� �� � � � � � �� � � � ,� Date To From Sub�ect ENGINEERING . PLANNING . ENVIRONRI[ENTAL SCI£NCBS 4G60 ffiTSAP WAY, SUITE A BREMERTON, WA 98312-2357 T 360 377 0014 F 360 479 5961 www parametnx com TECHNICAL MEMORANDUM February 25, 2013 Chris Waldbillig, WDFW David Dmkuhn, PE Mrtigation Plan - Eastside Beach Mam Replacement Pro�ect cc Jerry Gregory, USACE Bill Davis, PE - City of Bremerton Nicole Floyd - City of Bremerton Alison O'Sullivan - Suquamish Tnbe Ned Lever, PE - City of Bremerton Pro�ect Number 233-1896-110 Pro�ect Name City of Bremerton Eastside Beach Main Replacement ProJect INTRODUCTION Tlus technical memorandum presents a proposed Mitigation Plan for the City of Bremerton's Eastside Beach Mam pro�ect (USACE Reference No NWS-2012-1308) Also presented are two revised JARPA figures reflecting a recent design change m which the proposed new sewer line will be placed approximately 5 to 10 feet downslope of the e�usting sewer line rather than 5 to 10 feet upslope Tlus proposed Mitigation Plan is based on comments received from Waslungton Department of Fish and Wildlife (WDFV� and Suquamish Tnbe staff dwmg a srte walk performed on February 12, 2013 Nlitigation was requested by WDFW m response to the City's request to begin in-water work earlier than the anticipated allowable work wmdow A May 1�` start date was requested to take advanta.ge of daylight low tides durmg May and June of 2013 The mitigation requested by WDFW is to offset potential effects to riugratmg salmomds resultmg from the change and mamly mvolves improving the near shore habrtat by removing foreign ob�ects from the beach Effects to forage fish are not anticipated smce the restnctions on work in m May and early June are based on protection of salmomds only With tlus techrucal memorandum, the Crty is changmg the request to expand the work wmdow The revised request is to work dunng the penod of June 5�' through 12�' for a total of eight worlang days The remamder of the work will be performed dunng the anticipated WDFW-approved work window of June 15 to October 1 Table 1 below descnbes rrutigation rtems identified for the pro�ect durmg the srte walk wrth WDFW and Tnbal staff In general, rtems hsted m Table 1 will be removed from the near shore habrtat usmg a track backhoe wrth a thumb attachment and a small off-road dump truck or rubber tired loader The removal contractor will be grven the option to haul the removed debns off the beach by land or using a barge All removed items will be disposed off-site at a permitted landfill LJ � TECHNICAL MEMORANDUM (CONTINUED) � Table 1. BEACH MITIGATION AND CLEANUP ITEM APPROX. DESCRIPTION OF ITEM TO BE APPROXIMATE NO. STATION REMOVED VOLUME, SURFACE AREA OF ITEM, OR NUMBER OF ITEMS TO BE REMOVED 00 3+50 Single piece of concrete debns 0 5 cubic yards (C� on surface 01 3+00 Excavate and remove surface 1 CY concrete debris 02 2+50 Concrete slab debns Do not 150 square feet (S� of remove back into slope concrete surface area 03 1+00 Place quarry spalls and np rap 1,000 SF of beach surface from beach back onto slope area above Sta 1+00 Place 1' topsoil and plant �nnth nahve npanan species (drought tolerant) 04 5+25 Wood piles on beach Remove 15 piles, depth unlrnown or cut off 2' below grade 05 6+00 Metal Sheet 6' x 12' x�/z" thick 06 6+50 to Abandoned concrete bulkhead 750 SF 7+00 along east side of estuary, m sechons 07 8+00 Abandoned concrete block wall 5' H x 12' long 08 17+50 Duchle pipe,l2" 3 segments of pipe 09 20+50 Concrete fence post base and 3 posts wheel 10 22+30 Abandoned retaimng wall, 250 SF venc�al and honzontal 11 28+00 Corrugated metal culvert (CMP) 10' of 24" CMP 24" to bulkhead Cut off and remove 12 30+50 Miscellaneous concrete 15 CY , masonry blocks and concrete debris C:ty of Bremerton Mrhgatron PJan - Eastsrde Beach Ma:n Replacement Pro�ect � �� � � �� ,�� � r � �\ � � �� � r 233-1896-I10 � February 25, 2013 � � � TECHNICAL MEMORANDUM (CONTINUED) � Photographs of each irutigation site are attached Approximate statiorung is shown on attached rev�sed JARPA Page 3 � Other umdentified miscellaneous debns items encountered wrtlun the footpnnt of the work areas will also be removed It should be noted that no matenal will be removed that would potentially impact slope stab�lrty (such as bulkheads located at the toe of the ad�acent bluf� Removal work will be conducted concurrently with other � construction activity Large woody debns wrttun the footpnnt of the work will be tnmmed the mimmum amount necessary and the trimmed pieces will be placed m upper mtertidal areas � � � � � OTHER MITIGATION The City has proposed to revise the West Beach Access Pomt to a location approximately 200 feet west of the west end of the pro�ect Tlus location was observed dunng the February 12, 2013 site walk As agreed dunng the site walk, the new ramp at tlus location will be constructed above NII-��W usmg crushed gravel surfaced wrth "grass pave" concrete pavers The use of the pavers on the surface of the ramp will prevent the underlying crushed rock from migratmg to the beach � Crty of Bremerton 233-1896-110 Mttigation Plan - Eastsrde Beach Marn Replacement Pro�ect 3 February 25, 2013 � _ .� _ .._ ' � .� � � �9 '�� +� "S� . _ � .,., _ - V� �.��A �����,�,�".ne�'� �� ��t t � i t� ; � � � . � - 6 � 4' � E F�s� �. X�y '� � I ! , �;f� . i .i�,. a � � � F�� t��.� � � r V � � i��',� a t ��E� . �, � e , /. , . �;.,�,...�a . . �,8 t 4���Y �1,� k'� , i 4 . . `v'* . ,i �S t �°{r [� i . ' \ F: � ~�• _ . ! _� 4 ������� } � }�` i .•� (�`� � � � �` - a � � '# �' � �' ` f � � �°4 �, � � r a ,� ��R '_ ��! � ' , ^""'�` i ���,.' �. � �i� . � t �� ���} ��� � � .` f `� ' i ; r;"` ; �a i�i� '� n� ���'q • ' ,,,,,. � '�'c� w:""� �.� �F iC z :-r ` f �%'" f', � . �,'. � � t �^ .'--....' 't ,,'' § f i�' "t� � ����7,�tws� : � ` r , „�. � - .1:� r � � � ��r1�, ti 1�r�', �",; '.` "n \ :.. �'t'., `� ; a �^� � �,t. _�.. '�-.. � � . f � � . S � • ���� � � 2 � �4F� y // � J } u; � _ `! !'� 1 ' 4 � 1 °. � � J, 'C` ."� ; ..,� e . � � � { �t�" , * G� y L _ l �,+�'' {- �. � � ��' ' �.. " �..--� ��`'y ��a��`.��• ��,� i y � �� ���� , ' -,�"'^�t � a � j f 1 � - � t �� �'�P� � .`r+t � � � ��_.�.`��r r�. � ., y,2 ;� � � � �' M �'7�� t� �` � �, ` - `� f ��� f . � � ', � . . q . � � � � � �. :.. M �� ,[ } * � ��' 4 k ,` �... � J 6^"� � � , " �* � �� �".�$F�G� ` � �-?�� �w, f _ �, . � �,,. �,�f� - I �,,�� �� � } . � vf"��fl � .��r �, �� �>' F � s w ";� /f - . � _ i _ ' . ' �r�,� � �. �+� ��g� � �' +,M �� � a ' � �l� '� _ �a g i,�'k f ' �,� ""' '�'� - �,� "' � t . � � ,'{ ��� � 7' 4 �� � �.,� � j .w ; �-` 4 ;'_,." � '--^ , � a� ��� } s { .,' i r a� ,�'�``� ,,.` � � �� ��••�,i� ',?3 +� k�l" � �� ,��� a d �x, s' # x y, ... r'4 - �� i� i - . �" i� ti, �: �Y �. F g� R t 4� . o y � ! �, '� �.''/' { ` '" "� � � � r � . _ � y �� sp,,. �t�, � � �'� ��q p� ' !r '. '�, ; � � _ t l >x � �'�, � � � X It � 1 ,�, $ �'� f rr��` �� �G ,� r ` r- � � z — �t � � � �� �� � ��` � � ✓ � � � � "'� �."�'� �t � � .. . ' � � �'. � �y� �� � �� x,�� � '� �,,. .;.'�.., � y . �� �,;, : . . v r..: t & ,.p,w.� r � y , . R ' .!k.� a . \ . , i 35cx . '�,y � �� t 'Y , r. �., . �.., � � ' y� �. ; � � .:� � „ 4 , r �� ���..�r . � � �� \\ � '� '�� ���' r� 4 4 At� .s � �,� : z �'�. �',. f:._r.. .. _ ��. 3 _ � � � '7 a% �.�S Y '�; y � ��, � � _ °5 � . 4 ��i � �\.. ���� ' • �� � � �^� �"� Ceir . ^' ' �'�"�---��... \h Y � * y:/� :''� p�� y�� 4 �q.� �. �j� ���� F � 9 '' 4. 1 »..� �} . 5. < i .✓ a ' I Tti �3,.' "� ' u , *' � � a �C -�„ � � � � , �c . � I � ` x : i K \ � . � } � �r� � �� . s , r ,. .1 ! /� 1 \. t .,-^"' r.i - •�i i � 1 '�� � �.. ``'-: - 1 , , - � -v � ' �� * � ±.'x � .� �C. � z !` ` ;� `'", . l ,,. � ~�.,` �'�"`/ . � - i�"� �FV„'�,�4,'"�k, .;b� k . r� Y° M�8 } i.(_ Y � � 't ��� �� / =^:. fS � t ` � : .+y "„�'�',�'-- , — �}� � '�" v � ` �- t ��� r �i � ' ! , S 7 �,� , � .�, �, t ��'� 4 1f � ��•� <. ' � 1 '� �/1�� �* \..` ^�t..�v�' , �'� �� �ry«� � ♦ . .,-E , . y ^.,, i � d i ..^^^ ��c=' � .-lf i � . � ���i� � �� ��� �`" ::�.•����' � y ! i ! . �� �.! v �..- 1 a f � „ � ��-a, . w� ����t%`-� � `` � �' t��'����' °r�t��?, � � "'"`f�, - �'•• i� .�� : � ��s t;�' .� ��� ,. F,"�.��, >... " } _ J .. . _ , � •.. �.�� � � � � " � � ` � ` �� .,, �F , 4,; 1 � --- 7� -�'�'�-.. , . ; �` , a� �a�. " "' - �...._,�, ti � «w , r — .. ,..✓r""." "". . 3 t '�' .5 �.. �..`"""""'..'..�..�. � \ `a' ; ���` y. f . k E f �` ,Pi'",''�.�"� \.. ' � t �tt�' °. ; E � !#i.Rr; x � , a e� � �� `� ',} ''� � , � * ^'��� i�� -�°�� �'� ��..,"'*-��` �+�,'`� � � - _ �' t ���� tR. .� �;. �� . ,..,: r `� -�.. .a� '-*�� E. - ..� � � �� :' � r .g� .- �� �.� `` \ _� / .- d ��i,�y� �: „'°�.--\f '� �.`� ;'`� ��£� .�" �`•�.' �.. , t � J , p � � f �t_�� {�'"•: Z ., 'tY '� v��,. w...,�_ "'« . n. . . � � C' �y{� 'i„ A - j ,�' j �` .. � � �p�� �' � * � � a;' 3�✓, 3-`"'h. �yv� "e� "'+/ , %�. � ,'� t i3., �� , ; �k�,:. � �':. L��.. �-� �,_ � "•, ' � t � .,,� ° �r� ,� �'` ``�' �: � � �. � � v � � �:. � ,. � �,�� � � - � r S , , �''+�� �''"t" �' �'�.' �'� - � '1 �.� t � � �����v�\ . i��' f "� ��" � a �^S,' a� z -. � a, � s .� ++� '/ ? av. � �� � �:� � �"�' `u[ ^�,'� � `^� y f , � ri� � �. 4�a��r. � . fi ; t ^�a 1: . "��iE'�����'*�. " fi� �'G . j ^ t�*wy.,��^k..w � j� � ... � � y � �� i � '3;, -•,,ti,, � ��^� R3 " ,�, '�.„ � 4 '� ,3 E .✓*. ;�r�� � .<'r y � `^ f „ ' � A � �� - i � :� 'Z' 1 ���.h � ��� � �F �J � �,. Y � p� 1� ` I�,� ��•,• .' � F �� _ ` � � ^c °'cr±�" r � �r � 3 �'`� "�. �-` A� ���'� ° i �'', �'�",,�'';� � "'` � ���M . �P�''F`�a„' `+:,c��,_` '1�"•� tl �r" a. �`�. �, ,a� : �r ��'.,�,�'� '~`" °}; i � ,,:�*. '�.�� �'�. ' �.t � '� � ��.� � ?- � � �i,�� �� � s -� �� -� . �'S �� � � �' � — �z � ' �— �� " '✓,�, ��.�� c' ��" i� � �j `3'.. � t'w``'� rs �`7'� �� t _ � �,��; �, £t �.'. y � e � . � ^ , y f F ��� �„ � �^s -" [ �rrF'+�s�?� '� *t 1. / , � . - 1-. : ~ `r / I �, �s r'`'� �' ��" '�° `" `Y+ � � : x '�-> .t � ° �� �� � • � � , • �.. �e ,_' t� a „E �. r�� � „rf , �s �' ��� ! '� "'�+�. t f i y � � �� y� p �i "�,. � � ; ' �T ;� Yr E _ ,�, � � Y "�- a �l - .� '�„ � ' ,� a. � ^� y ^ ,--� �� • fi � ✓� � iiks �� , t '�.. e `�� S ` w �. ' � � � � & � ,�_ ( � e. � . '� ".: � � 1 a � �, ,� r � ��;� ' � ��,,-- � ` � .x � -'� �.. ��a � _��`*� t `� �� \ � �� y: p� ..... � :� „""".�y . 5 '4�'�,4,,. � 1 , V ` �.� Y 1. �Y.�� •=�.SnA.� W � l � �. �+�. Y �. Y �� �',��, t � ' _�. "' �� w r :° .., ^ b �. , :��.., � , y� 4"� � .� �i"�s �»�ri 4s � ,� �. '�� ���� _. <° " { +, � .� �� W '�M� f � rt _ 7 � �$y � ��� �� p � �. �,. ,.,,�its����s�� .�% ���`"X ` x ' i '.. �i ii '"��°� � - - � ° g� �, �, i .,... ! > ; ���+�a.�iFC ^�& j ��� ��.`ar:Ti. � p���t��^f. ;il 4 �� � $ � �'� �' � ,���� _ � ,. y 5� .�:�� ,� � I , ��� fff i'�t �� gz . �"�',��_ �,s.� :..R -�—, �� z `r .�t�, � � �� � � � �� � �� .��-, y t -i '� II � � � ,'�� �, }0s ��� , �� ,�� �a K�� �� y �� ���� � � � � �� � '� " "�""€°m Y, � �� � � �� �� £ �� l ° i` .q✓ ��µ . �,.aR P �` � ,l'AU. _ < �'' � � � � �� J �� t & � <s �.� + p ,��,: � � `„ �' y,�r� ; � I} � � � � � w a /� � R r + p � �'�� � �y x �p �-� ����� �� � �s � �` � '�" K �, � �d? �n t , ,. ,� k � _ _. _ � : -���` � "''� "`�' � � ,x �t � .; �� �s ~� , ;�J �, ''" � ' ��; 4 $ � a x° "' � � ��� i � 9 � � a � �� ` x �' � � '` >� � � . > . �� °. .� � 4 } " �d. � Y � �� • •J' ��� F � 5 Y d f e�� � � �� � � � ��� b ��� � t x � ��� ��� � � � � � x� fl � � �, c�-� . r .}� . � .�,�:e �"V`,�"'" : ��� �� �� ~ �� � � � � ' '�,"F�* � � s ��, �`^; � °� ��•d �' `'�� Kw " ¢. . � ."E " e � S � � a � _ .�'_.� ,�„ �'#aa,v � ,���, - ^ d' y °«b �� � �� 1 � t� �4 � f a',,, "^,�,�' t� �' � � �Q �r`� �,' �„" t � E + '��'' °- r �� � r � ���` � + � r, .r� � R � S � � � � a �5» 3 � � f F � ! a t ��c ,y 4 , °� � . � � „ � � � � � ��� � � �� },y d y � � „,, et � �. c}� N�� Ssr C d k'l' � s �,. ;�,, P �� 'x'� '�4 M �' � � + „-.», g f '.a _� m � h E ;�`,�y a . `� f� � . � I � `�'� :~�-� - �� I ���' °��� �;� ,, � � ,� �`' � � ��� Pr � � � � � �-� � � �� � � ! � � �� F ,�,. �.� �� � . �. � �.�a� _ =� � "'�,� �: � k � s� 4 � ���.�� ' } �� 4 x � � fi ,�!�e � ti . � �� ��� ��� t x 6 a� �$f��� � �� ��! ' �� t�a��,�`�h�`�� t m P� A ,t„ t *._ �} y �5�� � Y � �!4s a '� � �`"� �,�w `���� �� r 1 Q{�+4 �6f s k� d���.s.i.� '��SF,� Y4 y .'x`� i����� �;k �.�id#��� t � f ���'yY� (i `+� �� � i ; { 1 �fa R�� S S r ,�° y� ; �1 P� ' � '� 4 � �, ��;� {° {4 � �„ a � �P 1 � S v �,jd�"^ <'1 °�� ,� � 6 } N X ��� py � s h + z� 'J, �+ i "^ � �rre < �'TF� ; ;� �,� �' �$� �3 33 a r5 � k�� �� �s, ^�f�, ��c' �C x � fq �� �T �R � :�"���� '� �,y� �+�� � � ! y �¢{ 9 #�� � p� a� � 4 4 � : � 4f A ���� � � s ,�^�� �w �� r � g ��y` }' ��� 5 'a a ��`* �.'4+ A ��[�.:F � �„'�� � �s�t* �� '"'�'�� rir �=��A��'" � r 't� ��� � '� �r �' �a� � � k Rt ���� �t�� �`�' ' ��� �, . � ��� ��J � �+r � r,�:�L i;� r�, � 3 ti � � e'; k �� ��� } t� [ <�v,��a�� r °- � �' �� � �� {< 4tr �i �r �`��:�`` ,,��► r, � � � ��* U���?l����.e�3Y} rB.tE' k , . . � � ' � �- y r� f }� �+� m �#. _ x. s� � 3� � > � ?��` x �,�.. : �i#. ,�..� :� h + �'M«; y� y �G � ,�i.f'$T �, RS : F }e � ♦ G ' n '� I � : �� �"x�� � :� � � � � �; � ' "� 4� �� � � ��� �� � �{ �� � � &! , �* ' ��� bd � � w � � . �° � � � � � .� ;��� E, ,� , � �,� "'� 4 'a �x�,�� '��`'� � '��'� � � '� � � � � � ` � �,�,� �.�� �,� � �� � � ` � �� e YK C i t `����g,PyA �� �'� � � i ,.� �` � y3 e �� * � ° � � $F " ,�' # � yP¢' � � � g t �' &" �{ w� � � � �� $ ��d $„j �� 4 � {�"� S s. ° 9t � �..� �� a �. r.,�t a� ��.�;,$�t � � 4�?'�� t { �"i � �7. � �t �� 3 e ` � #�� r � 4 ���� j# � c ���� A � ��� � q � . # " x � a sY � � d � 4k. r $ ,� � ,. �� q 8 ' �r �'S q � r s 5 !� � A �,.` �,n� U �' � � 4� � " Tr � t '� � � y �+ x `^;�N" } a ��.?� w �,�� S k '� � �,�� � � , �' ' ,t a ° ' 'm. � i 'g � ,�3.' + '"`.1`� �c` �� " t �. � ` �. ° i ts +�(� s c• t � ,� � � � �� . �.,".� � °6.� � '' �i N'� �.� �� ��,�`�W � ��`��fi� �,t ��C'�� � �,.� z JA� a a �r� E � y' � � ' _ q�i � � ;� �+�* �'t ' � � i + � .�. � �° �_,a . ` � �` � � w-[ ; ����� .."����� ��.L�� � 7't°i'° �z,��,� � �„ i . �'a � � � *Y � y� q �*�, t � f#� �. � c g .� „�- � , a � k � , � ,.,� �. �, �'��'.� `�: C ,� j�} �A � �� � � � 4 ��� � � a '�`" ` �s �� � � �S�S. � t5��>'�°� �� �� ' �� 3 � � �• � ; x ` , >, �� q • � E r ..-��� aY � ���a$xw��RSt T'�r ���, �'i q'+� A� +y y � r « » � �s �.a � �� {A ,'�r � y . y � ., a R ° � � ,e.� �w a a �� �. � '� t Fx #P ,. � : ��: �> � ��� �� ��.'�, �. t.t � � cri� � �� � i, ,� � � � $"� , '' � }}�� � ��' w'�� y r e � �Y s e ya* ..^xi + �,� � sR� � 3 � � � ���'*:yi�l�,. 2 � s �� � .. ��- '� � s � ���� � ` � � � � r a � �'� �a^ �� � m i."Ak s ' �� i � + �'�.� �� �.` i ���> a k7 �l^ s � a z d � { �'� � Y�� Z '�i�'rli��,+�'r�, � ��� �� �,'� g {, �� � � � Y � � . � � �i' " Y � '� � � �� � '4FT ,��+ r� a 4 p y �� 4 � i i 1 +� �,w� � � S � ^ ��� ��' � + � ��� ����*�� $'E66tt ��$�« 4 ��'�•� � k� 'w°„ �i�i �F �'s� t �; �9`�' 4 ¥ �41^ 'Y a 4s� y + � � "�"M.�°'" ' "� k�'� .�+ � �" #� ,���� xs ��'�` � � ��"� '�"-i` ° ' � \ 53,,...� ^�"�« y ' '� o A� �t �, % � 1 � * '� � 4� � p y� � �?� W & .� .. .� � . < v._.4. � 2f � '� �� �� l�9��� �' � � � '� i� " � u � � � *°�� ` � - �` l " o = � * � ; t ���n � 4 ,� t� ' �� � �� � _ �` � � �� , .., —,.- "4 x , �a � ° '* �� `� y_ � � S x � } � t s 4 �et' � �` < � rv Q � �, �, e R� + Iwa � f s � � p �a � ,. N'� s .N� E s «t< d t C � �°� � �. ���} �`' � ',�; � }r �� � a t � ' z � �"� t,t � � a* ' '�y, s K L '�i a 3F � l a ��*7 u �� � (.• � ;���� � ( � ^��� ''�� °€ � � �[, � s ,{ �, s�� � o� � ,� � �r ��-4.�'� *" � � {p " a � % t ' �j S,'}°Msk ,.a � ti��� � ���>lt � :� � �� � ��ne a �'�� '���`ly�s: �.�§. �"x�K ' q ;a� � a 'S � ,� �Y5' �i 8.°a.4�.. °'1'�. � � `* � T � �k �� � � � ,�� '� s � t r " t ;, '" � �� , +b° ",�' � � y[ !' ' �c�w< y �' ,�� � m Y ''��, 0 �• � � � � L�'� �Y� � 1 j i:.� y � 'C ` 3 v �},� i +�+� ,A � � « * y ' p p 1^ � '' t J � "' ` �.a`�� k �fr 4 � ��� �2 o-.�+.� � � k Y �� � " ' � �' 3 � � ` � � � �,�y � � �� � � ; '^R 6 `� � � d ��,(" � � � �8`�. [t h � V { �� � � R �� , � � k n � ,`� ! ! �! t .� 9 { � t � e � e . ° �` �� °"4 � �,� � * �,. C i� �� `��� � �^ e _ � �`� � � a �sl�` x '� �§ �,��,�" ��'i� �' �'�'" � C ' � �.��, � � '� cn� � > � � � t +r � ��, . c �, � g� �� ^ �$ ��. a�. a ' * ,�. � ♦� " '� 9 j y y,,. � � � S e i �,�p y' � ,� S ,f � '^£ } p r � � � ln £. f` h ,§ *�' + f � T1 �. � s � i � f i) � 3 � '4 g � i � " �! '� t � �i' p � � ���� � , dt_ , 1 '� x �P i � �" � � �s ^ P +n 1 % A r � g _ � �` � °�' �� � � � �'�„ y�`� � }, � 'y ,�. �. * ' .r Z n k � . s �R �Cq� B 'i `,g �' 44 ' ' h� � � �� M � a .. ° �. � �4' i � �.A�§. � p � � 4 -a 4 � i° � .. ro �. � yf � '$ # �,$� i � , � ° � �# � � . ,. .Sr �. ;,� f � av � �. , �C �' g g '� � �� � �� 4 4 � � � °� e � Y � � � � m � � « � � � �ro �' ' �` � � � � ;� 9 Y S 5 .� � + * � �i �; 9 s t �� � �� � � � � � � " v � +F � � 4 ° �s S � p '� � s ,'�' ' a"f �' � �h�, �� � c�r� � �`� � � e Rz< � r �� ���,��� ��� � ��'�� �� � '� " �`�3 ` "�i�i� s.". ��s � m.� ��z�� � #��� �"� + � �� ����� `?�"�.. �,� � tf � f 8 '" K ��" 1 �� � t`� t "� F � r� s -, E d4, �T T " � *.�'.�q�� . ,�+ ��� � ^ �t � ' �$� �, s �� � � 3fi+ e e' '�S ?i'k �L �t 3 �"� { � �� � � � � �� '�r 0� � a ''����, a ��}� � 'il 3 I ' � *� � t Lb���.ry+Y,',;y �t b �+ j. p �d" A � ��S�d �� � 1 ��' d ' $ L � X4, $ � y- A � r ��� � � � � s �� t�,� � "4 R � � R� � �! � i �� ��4 h6 � F}�b � \' { � � � ��; " ;� e.� �p �r'� �� T � ���b � ' � F ` � � +� �*' V � p � M �� � ����... C 3 � �'���,��SN�`� ���� n� � 3f � � ,� t ° �� ��� � � �� � }� ��� I ,�, a i � '€ � ` ��'� s �'. ,, t ; � ' ° ��� � � 4 s� e t � ,o � 1 ��� 1 ��n�'g` ^ �>i *R � k)i� � � � �g,p , ` � � � � �;� >,�� � ,,� x 2 �" '- ��� y 1 � �• � � � � �� �" � t _ t t_.`, x• �+.. M# ��'L. aiii. y � ��"',�.� : y �.,�ic 'c���-�"-�,;. �,,,�w . . - . p.. -..r �:� .*�,� '�;,� "�_ �r�^:- � ��- p �, �";�y�';�.�"�?�, "�"�'��'��-��».���� „�sr �.'� '� , . � . �,..,.w � �'£�^ .,� �;..w,��'�`"w,� "`�' A.��m �".=f"3�` ...y M � . � ,� �.? ' �` � � "' , z..✓' ...�s,,. . ' - �r.. � , " _ � � .., �,a i 3 ssyn �, v - � m^� ,� a� � , .. ... . : ,,.. , , ., . w .:.,��.. �'.h "�� ' � ',�!a�'c.��" �'r�. �i.,. ��. � ��,'� _ '4 ' .� ` *,�'^�„�� � �� .. "� � >�'9'r �' ' - a ��...�� . ., �,�..,» ..x,.� a .. ��: a. ... �..'�. ,... �.a�' � ' �.�. ���� . �..�,...+,�,.�•: �; � , w�.. ..,.p� r"u.: R '.t $� t � ,y 8 ... ._. ..«';' »,m..x` \'n'°%'.0 .� ..� .. .:'...�_� �s;� . ��.,, ..+°'�:Ar... � - �.�.... NK�' .° ^ •.+� vK�zA��� . �}$+�'� '.,3"� �� � ' �.��eana *kti ... - .�- N , � ,� . .: ""` � .; .. �.�_...t'' �,: ..�,':� ,�,.. "��Y ,.,�;,_ � .�.: . � �. , =y,'"s��a�-",,a ✓,rs� `'.�� . '�, ..�t:: -- ���'.- "",�.-.t'�l��� r :.'�� .•k: . °,�.:wc^�"'� � ° _...�. °:..a€�:. _�,.<..».►.. ,�,. ,�° ; -��_ , • ...�.. � g -i �� � - . . .�„ F"� ..�'-�" .. �'t€.. :s+� ..�.- +Y. ,..:.'� ��.,; x""` ' ,ie� .,;� , _ � ,. , ..-� � �?%�" '''"�4 � _ � ' c�.�"�7MR'�. ,�.t` �,� : ,. .eF '`�::, . .~"�,.. .E- .,.,, . ,�.. � .,.:, _ "�y'W"m � ,<wr.' ;,,a . �','.t.- ys-� ,�,. �3 �.�:�.��: �,.> ',�; � �.:aa� ..,� .^ _ �, � ,.r ", �� ' • �c.. � . .. � m».. �� ,�, --'�. �. ,�� � ^+:�.,,� �; . � � , ��, � -�<mFM. r �"-°_ +..�, �;,.w., : ^^...^"• �+,� .r �w^^a, `._ ;;: . � � �+.. � � ;,,y:z� � � .�. . . .� . .,.. .. ..r,... . g .� . � .,g�'. . _ .-+��"v"�. .,q �� ..»�..�'+� ,r'u�:.� - �'..�.� '�k .q� _ _ . � . . , �. � � . . . .. . , �""�...:^ r +,�� „ .'��"�."'""�. � ..,�*s . �.� � �S'..� _�„ � :����,� .� +' � ,^�."^".��"'S�' ,�.;, _«++'k�_ � q�r°� a,:��::'S ,"�*.'�;� .,,,., ,. `�,w.� � ro ^�"'.:�.w.y�,,.'n'i'� - `: .��:k'�' .*�,;,�„�`' si �� ...` .� �y!yA� .w""�a, „�_ "� +��� s:'� y°a�' - �.�.�t`� .. �. � , , .' l ..^ - � .�X .y� + � va �� ,, : ` � i� � ^^�wn � � � '»C 9•X'M� '°�"� ...MC.�y�. t tl �` .�°�� i�.�,� . � � ` � �"'�'�, �.4.' � .-,�¢ �..4 . .. �"yc"".a�r �;x �'-�w.+ . r ` ••"y',� -e`r:~�s' � "'S',^+ ��.4�`-y��,��gY .;'�„"�'" .'�' '�f,"�`^""'�5sM9�� �?�� � � . ', '+ms'..,,,,�,�.� . . . . , ;: a � � .�.,�+ ,m, '�'.f' ��ac-^ �.--», -e . . . �� � , 'M.. �, ��a� �'R r. �, �a��k , •j� ., .. .:.� ' � �� . �.�g ...�y � _ ��.,r y ., _ �.. � � �. �� �'�' " °�'�,:�'�',� � ^C : fi�'" � '�°"r`�" . � , a�: . .. .. , � r , ° �. �+ s :;� ?�`s�' .-� t �'-?� - x �.��� � � , ;. . % ;.. a� ,±.��.,,� � � .,�,: �r' �,,.,�, '�°� "� l�&,�� �' „��r", ;-.�'* :�sr�` � ^+� � y��� �a+ -«�.�,�; �.a"�&sn' , _..nnMM�".�� � �;� � ''�`:� '� v. : �� ; � s' �.�~' 'c�- "x ,.� 'n ...� .. .._...«%� ,� � .: � .;�. �'� ti, � A� 3 ;�'+� �-� r ��, . �,::` �` ��� �,.... �..� ..�.,,...� ,�,, �.�.. --^. . ,,.x� � - y �,3 .,�._ .��g '�'..�°� +�;,... � '�'a��'� ...... . _,. �,� ... _. .�:. ., .,.,.. . >- ' ba '8v. ' .- � •, � ¢* . n - i £...: ,. ��, �t:-„'� � ��„ � .. � ... . � ' .�, , . ":. . . _ � > :y '.., . .. �-' � "Y a^ a ' "��, ,w .�r � x. , .r . �� a N. � »'�. .:� �».�cY, . ��.,w� z ���,.� „a� � " � . .. . .�.; ;,�r- « _ a� � } , .< ri p �;.� , s. 's'� . � � *».�Y+4, � °c�`��.., ��'!' _ ' t � ;°: � -�. •. �.'wa #,"�. �i�'� "�"� ,�.��.. .. . . _ �.+��,. �� � �..`�^... `'. „�.�. "'� �'' ...z <:�. ?"�` '�€, �-:..�,��. . '� .�I �'.1.° �^.r ''.+.- . . - . �.�' . ;�, .,.-„r.a: ��:4��^'- ,;�r+L>°..t• ,,. „� �, .._ ,,�x-�;'�- �'�..�. - • _ .. . . `� ''�.�.:;",� ...,;�,. �4 µ ti..��' ; � ..�.r�� ?^. �ra:°a�., a�.` .; t , � r " . d5� a� y. ,,,� ,..� ry� , �,:^^ � .. - _,.; m , �{._ r . , , . . . � .,�, ,� �'�""'R ..� :� g+ s� . . , •. „y ,,�'A. � .i:._'w� . P � ,?� �� i � � �... �^ �F�u , �.,.,; '.. f' ;�: .,,,... - . ' _ ' . � �:� r -�"� ,tC ' �r. ° �,...'N '� � :.r•. ,wr5* ��„:.'>"l � �+�^�» - '�++r'","�y r' " . �'� �. n , *` � �.,: � ..��..; , - , ..,„ ,.:: >�:-'�S� � ' . .. - �'w.. �li%�llc � .. ,�„t +...,g ��. r..��k .,,t ��,�, 'G. . : �.:,�.^�..,;. ��... ..y.'� -`;�`.� R ;���,,.,��..� . ;- . . ' . ' i.. ., a: � �•s;�,""'g�`'�� . �,�^'aa" �'"�..:,.�: y _ _ ,+o �'g"' ,� '�;-e .,,+,.� s � - � � �..; ,,{{ ,� a�,�t+�' � > � '&•,�,�,' ,..:e^*.� � s ,ICXM. +n °� � - � , - . . � � . .a rr w�. M^ A� �"��'""ri"'� it3� .�'^ � ' �'�' �"`� ,i1 �"� ..'"� � .. - � ^� �..»r' t'�,rF_.:- . .. . .":,, �„_,� �`?#. i.`.,�;,'s°'3,m .y � '� `�°`�"" � .s ' ,�„, o.:;.?,... ^.,�^�..«' -�:.,, d�` s. "., * =�%' ,t _ �� . � �•""` ,i� �' ' . - , ' . . a"^'�,,' p r,,, ��� � �'F"�°° �,3.1�..� .;�,. '� C.�¢ 't.. -Y"S+^.a� .� �,E a v' �,aa.i• ;�.;.� `" - -..�. � u �, ,�;,..« c, , :,b,.' . . .- .. � ,.a. ` "'. «^ y� �'r �'.,.alk .s?� ... . . � , . *.�"'�„ � �,g+.- - � -� _ ., �a�e . . _, ���^ j�' ° _ �. � '".",- �k' s.,� .*� ..� .. � s=e�. �..�'�` �..'�` r �^��E!''.. s^�� :.���,�-�'�' �� `sr �?'. � _. ° . ,.s',+,'aF,� w. „ . . ,� � .:� ,.^� �,. ,�` . � .. � . ... „ . . . `J-+' •�.., ,,.:' .�, ,� � . . � ,� . � � . "s� � . i � . .. * . '� �F.x, .�. , . � .. a r q '�" ��.�` �x� �M.:,�:�, s 't�`� • e '. .,�.,.. ,� .�+n �r �'- - ' - r 'm . - � � , .• _., � . . .. _,:.P.'� �. ..., .�c-,. r^;�ar, > . . � , �-.-'�,'...�. . .-r:�.« �r �x � , :....c �' .,:,r � �� ��� .�r ...a.�, ��� . ti a�� , � .'z . a^. � �°` � ., r'„t' t. . ?�am . . „ A.. ;. .a�r : f. ;s• , -..wi'�' ,. r ° _ � � a.. . . .. c.� a r . � �� q� ' a,'.°� .. a�'� „•�e.. �+xf...� �x �e.e� ;b,-M�R�'�'w.�+ .r`�' <iS, . y . _ �jE ; i ��, :_ -cs . " , ... �'T `'�b�+� �� ' ,� `�,.. `� y � '`��e'� �� •. .�ps.•. '°`x �""'y ... +�..,. . . H �£. - � ..: � ° ,,; :."S ,. ,'�F �iih ,...�-�.^ "�'", x ;'�f . � � - - w.� .;.` w �• .. ^^',,.,d, '��+. -'=.<�.... ,a.. .i . " r �. - -�..,_.� :�'^i-k.�:a:�' �-,.�;+ r4.. "5•�. '§..' 'M- sti. }#^.r x. � �...� `w . �.,y,,, _.. .. ,.� ..,...,.,�,+�.,<a,.� ".� . ..'� .:'»:.�,'+ ,...� �,,. ,... ' ,a'. ..:.., .„!' . �6 ', ..�R�` .: e... '� ^ �=.. s�. ,�,». y�. , ",%� .- � �'r.'»�, c:ARa. ���.§w.- � "a,,,:"a' �.as.�a . �*.:" .N`, � .., :� � � , "„� •' , `,+�"`"' ,� . - . - , ,., °' = .,a� #� �a- . a° ;Q - +q ''°���- + . +z�. � '�� .� � -..'".- :..s . »,b.. ...... .5�� „ a.r�:.��,,,,,. ... ._ �. �-...,�, ..., � ,., a�,._ ...�..!�. �.:;�.»�s' sA-^.� +��,+�.st k : w `'�t., ��'�"� :"��'U� ..�` �. �d'`� :.,,.:�%" ":�,. . . .,_..<, ^�'c M ,.. .._.�. .�,-r .,w; ��'.�" "�'=�^,:° . �y?i.k,"'.,,.w�,„,,,.,.i,"�:,.,...,,�R. - ��_. e ,°�,^„"^::° S�2r:�X, �� ^'�:��.r,�" „r�. .�,;.'"w� _ . ;�:,.*.�� � .,....a�:„„ . ,.,,�:'^ + :..; x :a�..� a�':� +i ,s�.rr.3_,..,,.,,.-r;, .,.., ,r,. ...,;, c�..� „ �";"�yw,.� �.�.+�. a�F.. a�`i�`°� �.. ��.� ,t,r.,;4�i•.. x.�a-��p�s+�, _ �..x� -, 2j. � .._ .,ae ..9�t?iA.;�."z�h!!�-.�• ,„. �� ��:;�;e, �.;..,*�,<..: �;�: ��; �-... ,�: �r'� _.�„<, .,,�,,,. �" �.� �` ,,�a. �-,..� e , ` . ;., ,� . . . *_�t _, , . . _ .�'' , � . a ''t�r. � � . ' ' +�s+� M � ,,u ,� �,, _ � r, � ' .�-ea .v�. ..+, ... , ,e►:r -.. ,^" . ...z'•-.. ... .�, � `'�;� . �°.r:,.. •' u .. � , r.,�'£^�'.-' e ..� "'�r ;�•���°'..�', lk.. �°'" ��'�":.* ._. u ,�.,,.''�^_... ,,,., �.m ���6 �. . . .. .:� . �-,. m .� r _�. = „�� x� - ?,. �.�-^ .;,�-M.��. �t!-�� t �if'�� .',d....�. -�.ro ..:-,->..- h r'",?a� ...'�' ...::.�^,r�,'"�.x: .��q,: � �� ,/!�1° .. - �, :�` .�b�ra._,.� �<,'�'" � �'�'��+= " """� � i #�r- 7. .,w � e�,-+.... �,&' 1&.„.�e •,�,.,,...:, _ �^s. ... ��. ."ylk _ _ . . . ..o � .. ,. �- .,. .,, s . - ... .. _�� .,�,., .a� <�x+. ..r:��:�. '�;� .?; '<+:'f..�'„„ ° IE�. �- .....:..r . y n' :,"�,� . � .40'�a �".. ":_. �,.''� �^'-� ° ,.-`�q` .°�; . ��Aa� !�€ "i!:'�i+.�["c ». . +i.'� �[ a ,".�..c ,it.,.�, �+^ti.. . f �,i�V'� `x � . ��. .<.,. �� .:�o ,a� ...... r �., .+,e,..., �_�.� �c: '�'..,�--- , M .,.,,�� _ � : "� '?�:..��-�+.:' �Md^s;" ,��i.r� .^�'>�R + � , y� #^�.,. .< �,'�`'j�.', �z�` �.+�;�. - ... �,,.. .'�. .�,,r ,�6k�^" d�, .�:� .,�+�^".5+.ffi �.,m,'X: '�� .�� �. �..„'r�a`` 4.� ���^""�t -.,., .4�� W�'.�^,�� F,u,:.�' �,p, '�..'tp_ � „.... .. � �""°�„ �.s.:^`�.,Ce��.'�'n, '�� .. ,� .. ��* �.� ��,,•ta��a'�1t',rz,r+T ^'�►""' °;,.. � ���...�.+w��+,e."R*c. � ��.a«; °��• n "��` - ,. ,.,_. .� . ,, '„�, .r s-ea+ � ' • +��. s.� ,.�.�- , #� : :.� , ,. .... .:;+�'3. ,PC, "'�*,��'„ 3 s,�, �e'��,.�,3 _ �-F`...r,°- �" „a�:,�...a: . _ . . . ' .,a. � .: , .� _ . »-,.,- � -«:�.„. • � � _ � . .»,�. �.»� �- T:R. ,.-. : ��.� 'm°�:�- 'i%•'.�.°�r"r a " , « � '�' . +� . �'*s- -�,,. � _�, KC�� "+.-.,._"'_ _.�+a;a.-.: +�..�.. - .. �t" .� m�.;�. '„'�''..-�s,,,�PS- R � ,. , .. - ��, ,�•-_'. .. . » K '" .w"".. _�. � � �,. -....r ...: -�t � x.,7,� .,. . . .. "�vr �� , ._, ..'� _ .. � � � � .' "'"�°' ��..- � �^ � �'; , _ - ..-.,.,. �. ,, ..+: .x., ..... ., �S' � .. . _ . -. �r�w.wr ''�+"', �► r,.,s� z.� ��, ��j .� urr....*!�R _ * f� . �'.�ee�" , ;.� , -- , r�d. , .�, x �,+�.m"- �.»�` » �`z ,�a ,. , ..e` i � +r. f . . r ' " �. .. � �� �,�;;+,�G : ..�..aPS.s a..,�' ^m •. .: �_ � .+wC'�' r.,..�.z. ,..�M�*�'F� , „s � .1.:�'; .. �"...r!� . . . .. »�i � ro � . . _ �. � � � - '" �. �': ,: � ` � ' . . . -5�.. 4+- . «�. r �� . � •� a �. � _.;:,,.�,. �` ., ...;,,,:�,.:* .„.�.-...'.��' +''= - ,.r�' ,:.. ..=.. r �'... �'rL^�a.m �.:,.�r�.���� e�-�.�.'�.�.E�;n,.�'� . �.� - ..�� e „_-. " a ',;'�'�.y , ' " � "- � ",' , "1L''' .-...,�,�_^' - "' ,_y�,_�":. , � r. � ,. �.. � ..�... ��-.�.� �,.;� - .,: .... ., f �.. ^.+�"�..!_...., ,..:a.,..�` .<,,.. ..��;.sC ,' ��"µ'a��"� , g,,:� -�nir�'� ..'*�' 4S"'- t�4 � a ",��: • ""` " '°�.�+ ; °`_'�c nm 'r"ar� . `.� "' ...as .. �'+«. .. ��'� .a+ r. `� �. �.. a ,°� 6�. . .... -- . �.. ,,�'" ra ... � �e . ....�� �� � ..� .<�y°�► t�?>°+� � � a,�."- �» '��. �.i �f� '�`� � + � ^S -'�" � �;:�,.,,-^`� : �� ^. '°R.:.f�`"� �;�"-� at. �►, �. ,, A'g� ' ��'" ,:,.,�; _ w � , ,r. �.. ,. -,,, ��r .-�.D+a,' �a1'+f�,.�� �.�.•... ro ..'-.%+ „�" � '-''�'�`-m ., i�s'„" -,�1., ,�,�.'. .;,�tr ,,�,, a+w.,,t+�'�'+i,�*'� � �'-� � a,,.^"�„�. , ...' ..�-,;:�� � �»a ,aPw :�� •�" ,_,�ss';w �[r� _�� �%° u .'[¢.+- �w .N,�b�..;>� w� :n ' ..�Fr, ;� �� :.:x' �'- , wm, ..., � �,.!' � . -�tw+� tMf ..�.,-°�,<,,,,�, ; ,�.a�t_,.; y;��r�-.€ 4 �°�_ m�� . ».,',rv. s, "���"t'fe....-'�P,'. '„ �c.,ES�� � �� . , ,"" '1 &-�*r�..R �..'�€-�t. . ...,, x � w. ... � . . -x.. ^- '..»: � .`�' aMr ,;;�,. "h��� -- .� ��`, ,. .: a. . � � . ,.�€-.�..�. .,,., s +� , c. . '"Mr>. � � > „ " , .. . „,., , � �,.,. „ , .,,..� "j ..,..- ....�,�+ . „ , . ,. _.. �- �,�!M ..b�:.:'; �:�,. ,. .� +�;�r^',�M `°" ..:a,ca ,�sc `� Y�"^ ��:. ,e,.ne..-o: •r�'`'.. "�".. m"�' �"� �`�� . :�e.. .,.«• �� .., � . . fl y y y, iS e'" -. � �+ ^ ... ....:r.�r.- � • . � �.- . q[n'�,�s^>, .... �✓ . +M+'° "�.""... ✓.°''�,:'M`� w � . "b,.^�.w 3 , ��,•� �'�i..�t"1�A�.x.C'aG���a -��, .,�'�+�nt,""• , "..,! "` a` ' � •:'f�.., ' •-",�».'" -�.;;"#�•=� r. r .aw,;.. '� �^. *•�.. ,,,.,,�,.,.. ,e�:� " "tlf. �,,.,� � ^� . . �, . ,e� :^.. .. . "► " ..� ^1e..,�.'�''"'�,i;,6.,�. ,.�;'� ' ..'. _ ' . , � ;°,��' r_�:.,;� "� �„�^ . "'�''� ARi:'+e+._nr •.. ww.,- _ „ � - �,� . _,� �.. � ,�w µ ° �. `- . . �<.�� � � �� '��„ � �'� � es`-�'� „� �� � ` �� � '�' . . � �_ „ �� � ,� � �� '� . -- � . � - ., , . . � > . ,. � ,� z .c� „a� < , �- - , , :� � , ��„` � *� � � � a :r � � � ��� � y . � •�n. � "�' . . -d/4 1. � �"°`.� � J ;;.."°'""�''`. ,,� 3 � „'��..+� eh" � � ,y+�.� �. '" c � ��,�`.:'� •�:-� ° , '.�,. � gr . a�""� +�"s ��� � . �' -,�+. �,,.�a �. , �� �s m +t� � . . "...�' �s «+,.�. ��� .#'<.� ��� , ��' � ����� �� �� �� � �c�x. x r ^ `� ,� , �. � - `. � � ,„ , ,,- � � , . . n � r , y ,,* '`, � �!� . � , �` �r:,>� > �°��_y��..` �"�� ��" " ''�'ir�,r' ' �"�y�. � �a' w `.+.a.. . d� �` � �+r, �r:�i.' � �+?"`°'_,� �, , ��. � .� """^�. � - �.:.¢- �.��,,, ^" . ° �'"� ��?r"A�b�,*�9. .%a;s . "'��'.'�i � � :�R^�a 9t `. � "°+�,a'..�qr q ..� ° , ' . .,. .i .. _ , �. �. w � . r • ,., . , .. v . .. � ,� • ✓�.,,,,� ;.. .. �.. .. .. . d � . , , � r. � ,�6� � >, . . . � �t�-- g . '±r :�M,I� . � +� � � �� ' � .. „ � . ,, . ..., 3� r+C � � .. � � � .,». ,.. � ,�S' .. '. y � � sv..�� .a� � +ii ». �,''" '�, � �n,a p„'�` �..� . .., � � .. � ; � .. ,!� .,_ �^iN"� � '��*"r ,� X * '�" � � � � � s � "�, �. � :z�`� , �r� »!�"a'��" ^�' '�� ' �'^' �.� � � �, � �'�' � ° � -'� ' ''" `� . � , ' �' � �,. y.. � � �. � «ra � .•" • 'a ��'' , ? M ''�"' ay. 'r�". "? �..,: . �,�,. � �':q►. °M � �' , _. � '�' � .. . " v. .>. .- s. -. � '.�r"y� � a : �n.a _ ,«, ,r* . 'f�' _' -.rf �a5.'� A . �� � , � � � . �" � .�.r_,�r 'd+ w�_ , r"" .�K.r� ,�. °5� '�:: "°�°`.�;�t3�".s.,�-,�iic,�..,'�,��. s ..._.r�...,air �'� ��m�..a o�:?�w� �� � +a.� "1$� � ,. . ; .. � ��•.. � ��:;: . . r;. ��'�'�'�a �',�r�� �.�� �,`y � � t+»� �, „'*�,�� � :'< , _ .'a i��� .��, - � �,�:-. — �� �°� �,� �-C�� `,R 4 �� . � ' �.� �,�, r!M'�'s�w►. ' e . ' ' � �� �� �s� 1� . v � , . . .,.. . . .. � .. y � � i �.f�.�_3a ��'./ ��'*y �.a . . ; , p Y �l�y' �¢��,� ` .. v � .� �� �� ��`-o-� : w' '�.� ��� y � � - . . . . �•t , s �' �,� ,� 1 � � � . ,, � � j � �: �� ,'� .� I ., a = `� t . .,�' �, . q � ,t :e� � , ii * I � i' � $ �'a4 g i:, �" V E"� °': € g��:� ` ��� _ � ;�: � < ��� � � _ ,�% : m . �rr ~� , �� �Y , �$ � ���,'' { �:�; �� . `� FA � .�� - „�' `� � � :��. � � , �� � .s �� S j- �� X �... : Y�' � ^ t � ',t . �% > a` ' .fi,:' ; �,.�is w�� - Tx� �` ��. * 'p' ,' : � � � � .' y , � _ �4 �. �� & � : ^,�mwa�e ���� � �� ��,r �'�K ' `� � ,�. ��..� :'s �, �f;�� ! .�i�'�g�». � �>,� . .:. : �P � .i ,� " N �� �: t� ''� � a > �£"�s+�� � $� �pyn...��k"" + A. TMA � � yu. , ��:�' ' . - ^ ,� R, � �� . �. .. ' s � � � Y � �z � t ,�4' . � r ,�, -. � ... ._ " .a � . �� �, `4 ��� . � '` � "� � '� �. �" � ` � � � � ��� � �. 4 ��,�� � � � � ,�;i -� �,� � � � �' � ( � 3 `' � � �� , I � � . � , 1 3 ���4 X 4.� °!�" ���, 4� a'R� 7 p b' "� �! ^i «. p � � a , at�� � i ( P � �- • � �y�� , � ' k [. t � � � �� f � i ������` k � . � ���i� . � .� � .„ s.i .. <..�:. �.`' ' . _ _, . - - — - �,���'��s..,. ' �iv �� �� � � � � ,.' ,. , . .._ . : . . � ��T . � � .' 4 .... . ♦.�� � � _ 5 a �'S�! > � _ _ ._ ' '/ 3 ��� b^. � _°, - - � d.�, 1" �� �"��� � ' � J •x ,� #, � y � � � ��, . . � ' ��; • wi` � . , ... . . ' �� X �. � y'���.. �f�,� .. � � r Rz x ., �. � , .�� . ��t s{ � ( 3 r� ,� f {� � � � 7 � �3 �t �t r` � �°� o �:u�� (� 8 � i i. �' � � ��" &`� ��� a� " `r. ; .� 3 f . *� '! F � !�` ;� 3 � �?� ��-��l� - F�«• a �p� � � , A g - s � �� � .�,� ,���_ � ; �� � � � �" �,���a,� ��,�+�i� �� � � .� 9A � +sF :�� � a .. S � �� „� � 3 , � S' u � � } $` '�� i `#' �� s "d. �� '���,� ��''� + . �_ . ry` � `� � 1 � P = �� � � �� f :e� �'f + lF� . . i` A `, � � ���.� � � �'. - A �1r�� �'� �', 1.�, �; �. ��' � � � � �, _t,� � �" � ���� . �" �` �,� ' � ��� �.. ��� ' � 4 I � � ������ � ;;,� ; ., € f x t t t `��.X y � 3'�{�s� ,� �� . .a ,er ^z i � v Sec� �, k� k 4 �, 3 � ,..:c. � �l �� 4� ��RS �:'�� � � � :1 � ���� � , i�t �� � � 4 „» �M �� ��. � � . . . � ����� s'� i � � �' 1 � � , ' �� '� . ,� J ,� y f �� �,� � � �+�.� �� �� �� � ' . � � � , �. � .- - .� �� , .,_e��,.�,��� �`��,�'" �'a,�.. .__ �� � �� � ,�� �,� � , � , , , ��r�- „ ;t .�'v��.:la�� .��i` �. ��t� l,Y< � R. � x - £ : +�;'��i �. x��.'� `x.'�. �,�+��� 6 � A`�ks}�� � w�A f f`� �� ��� ��� Yr` � S � .�F° ��y�'� ��} .�;� k 1 R N �'+ s�� r,�� �r� �,�,� �� f Y � p r i 'F` 3�� �� • v��''����'l •. "��� ����� �+�r�°� �s ? t w , # �},��� r � ����� �. `p�� � , ;, * � �- � ,� ��' �� ��� �'� ` ,} V " � , - , �`� � � ` �`; � �. yyn ��� '° ^ y, } � � �� �` y *M � 3 �' �� �, ._ r ` 9 �t �p '�NT �° T 7}`,Y tf �At,i �, [ � � P�,� � �° _ } �� � �'� T� f +�'.� .. �'� �'' r'� 3 � �'� E� a' �" 3 � �������: � `� � �: # ���: � � �� � ��. � � 4 ��;��� ���u'� � ��" ' ;����� �� N,' ��� - � .,� �� � �' "��� ��: ���} � �_�,� � � � �'� � "'��,a�� ��' � ,�� ` � '� � �x� ; �. ' ��'� �,},ar � C'. e �,�r �i� L� ; a k � ���� y 4 1 F k � i � � � $ �� 1t � d ,� ����''P � ^ ;�i€` £�{ `� �`�*�' � � ' i �: � r . +� { - � �t���.'.+�� ��'� Y' :�`��,�.. �`� ; � � , ` - � � � � � ? � c €i�s �:. , e � ��,�¢, ��� �� �� T s y } s, � k f� t�,4y,}� 4 ; �.� '� . 4 1�* ltn �, d i� � +' "q ' � � `t ff�4 �y ' �( ° � '�' p 3 � � � ; K 7 � � �. d' 1 sj �M �f y t�z � � ''� - � y +�'�'� ,� � j � ; ''(.� ��" ay� � � '� k ��� � k _ ���'!' v k �`'�` ` �„ � ,* t "�s..i . " .`"�`� +�, _y 7'� t� K 3 ia s, P � � F, � ��p� �� d � j te b �� � � '�. � 3x('„'!s,� E�� ^S �'>�.� i1 °�'� � ' "�^.;- 't��� � �'t;��y }� � t ;, '� ���<.- ` �Y� p r ;f ? t ��� ,.,�.�� a�'B'3 .$', �r��°.*: # �, k : '�; ;�� r��°": �, �- � a �+ . ' �'. , ;y. ) }, �� s ���'�t . , ��,' � �1 ,. . i �; ��� �}ss�'r �'�"'x.�.. ' I --', �' rv� , �} � i t ���'. ., _ � "!i 3"' i � �:� tJ�4n a'9�.. �, .� ��: ��"a k.. t. � � � x w � �� ' � s t � �� �:�Y .� ,# r� s/ �i5° � '� 'f "sl' ,�"' +'�}+� 1 br`� .�� � 4 'r �� ) r ��, '�,1 . ._ ' � j� h ` .' � � F '� �r �'�' � t °`� "�'.�1 ��, y j�. � �,�,, t'#�, i�f �,�` Tj '�� ;# � i «� � � 't',� t6'�� �°�ti ,Y�,�� k�' M �v' � �� d �' �,Pt� � �i ��i� 4 7� «�'� �'�l� a -a� �t +�.��� t��►�s��"^� �����t' i,�i�� J ,� , " •.�, � '� +tr �� ..s' � "�+ ,��. ��}�'�,�,��� '�, � a�t,'�'`�p��� �f4� ' j � p�¢ }�' � `'!� iit J �J�� �e' "�/ � � 'v�� 'f +* �?� "�t y �i!'�tq 3�3�' '�� � � + :�+d` �'�' ; �r� r � � � � ,,� 15 � , �}� i► S S�>} �� � p , � � !��, � *_ y�r ,� t � 3� �` .. { e �, r #'�, t ��,� # °�74� ����+i .�/ "N��� ti,r�'11� � � _ .. '! r • : G d�I` �F � t :;� ,� " ,� `� y `��', a ��`� ,t � < �,� � a. a ,%r» ' ��,' ,,�' �'`� �"",� �.'' �� .,r �"� � °' r /��+'°��'�� °�+ r�,� � ��b p J� '� 'F � � ��` .' i t yqb t ,�' q �y} r�� t c v � � a , a ,� ,, ,°<� .,t�.lt' a �'�' ; rbL:.t�% i' � 2�` �'�� ����' �� � � � .° �« ,��, � �� ,�„ ':; Y�� � � '� L k` � : u����� e r � , f �. e ��;` :� } �t ,��. � ��� � � � f. �� � > � � � � , ���� a, � �, �. - � � ,� �� , , �� w ;� - � — � �� �. �� � ,���,�� � ���,��.„, � :, °.� c � � a �+� �,�.� �'', ,,,,� �'.P �, F " � � w �„� � .� � a �z.�m�� wt � � s r ,�s Y� � T''�' «f t`d �� � S v. L`� r "�p P�� ;N y �.` v ;'�,a++�y.F . 4F d� M y 44 � .�*" _s «�. „ .�� �. .x. � e� � � �±r�v'�..:� '�. `�. * .. .a _ _ ..� .w ..,� �,+`�� � � ! r` - ��� • � ����t'. , �. � ' � �� r� �� � ,, , � � � � � '� �,���`'° ' � � � � � a� � e»" "'� `� p � p .+k f F�� �"" E i 4 Y� v� � N 4 � � S w- M e# ' a � m +�, d ..r ,�a �' • ^ � '�� .,�, � .. ..�; q �' n � " F ..9,. * �, 3 � q � , "� .�� v �, ' n �' �+ � z� , �� ��� � � � � � ' ����e �' �� � � � �> ' � tc� � � .� � �s x �" r �� . �' ' ax��� t,F �`�� ,a � � K �����e: ;��,� ��,�" � �`s� p�� � � �� , �� a �,� �"' +�"� �� -� �,�' ' �a � ��� �'�'` < r �� �, �� � ` "�` h+ ' �'� �y�n.3'�YC «r � ^� � �+�,� �^^ f . y �s ��'°*"���. �.��`s �,�"�"� � � ; �",� � �, '�'" $� ` � �`` �` k , � �.�� � . � °�* � � � � .`"� ' � � - . -°-. � �� �'� � .E � �� � �� �� ��s iz� ��`�� i` '�� `� f , � Y f F ( d � f .Y"� � F 1{t /% '`� q � � J ��,#'��;� ��i ",�'� � �%i ' , �"� r �'i � ���ky� j ro � k e7� �,r t v�. / d s %.^ S ���°'` ���� � ��'� x �} � �' �bf�f�'��s'�th'�r,'}` arg-�' �� . o -F i,�ff� .�'� r �` q`p�.� ' . r{ , �� � ` � �,� ' �' ;,,, h � m��; �, �`��` €, � � „�', u � � ,+ �,� _ . � � �, � °��� ��� � `� � � ��� > � xP��` c I °� � �. ° �,3 � � 4 j� �, �£ 1 y "' ' `� a� +'� > �� _ #p. � � � J ��'� {� � ��� , i o n Y � d � k f8 fL � l2 � � L� h t L � r �` �, �T'�' `�` ���0 4 3 ' , � E � ���� � " �V ".� F F � ; �+ �t�'�� � �, � � _ � `` � i �`a �! oL g ���� � � � ,���r �,'�� '+�„ °� 7 , p 7�7c ��� y ' a 3 �a. � _ �' � t i.a :,`� §.3`� � r a� 4 �'1t� �c�` "'9 r , � +� .� x � �' e �� `�'r #�� ?"° �,��w�' '� ��Y `�.o�' a�3; Q < � u ��� � �� � ' � 3 � ° , a � � � � " �°` � a �� �{ ,� y � §� t ' � t <^`- �� � C?� 4 a �d"J �'4 t x �' 1 � s� �, y '.�, ,,9 � z t � ° b ad`� g� 3.i �}a�i D'�g� u' �� �"� a �� - F�" 9 �''*� af°� "ml .. � ° �� � '' �;"� " � �• � � , _ t � � �°�� ` � , y �r � v y�� �'",„' ° �e L, t'J a � � ' d �< � » 3 � � i wsdz� ° s � i °'� ++�, �,.�� �d`�' ,� p � . � r� � r � P�s- �a ` z ` � r* r �S '� Y4 � �„� a� y} i ��� .� a °, . a��ia�i �e aJ� '�a � a e F,4 y � ��,+� 3 �'L' sz #�t v"' T !' � �'� �,��'' a #„ r��B r�° 6 fi . , c ' � � ° v a {� y � 1x � i� r , � � y �.1 'l c�"�� "� �F � j "�� �i ` / � " ,. �? =J ° e, � � �� � ° � ' � � � �� a r e " � �� 9 f�- � ��w `�'� � � + ,�',° , r� ' � y e,e '�tp ��`, R� { � � ��� �.°4 4a.��`�� * � � / ,f r a ' �> t , v �r t�§� ,'� � ,��,��'°'�''�°'y✓ �." a 4 � �3` '� 3 � �^�$' '� J t a 3 p < u � +. "�' � � � � � < �G'� � � ��' F� ?} �'� � �P w �' �c a �� �'�'�'� � -• � �x � p ' � *�`r e,Jr ;'�LR ����� �,��� } � ��� �,� � ��!`��" �`� � � � � v � `� 1`� � a � `� b '4 �i �. �„ � V � � � ( > °�� o o� � � L • q � � u � r e , ° a � P ' d g, '3 �6 �5�b'� �4,t i i s* t! � ^� ��* � r �"E A � } "@ � �, ' f �y // _ ° �� ��,'� d�.�'� ''`"r � ,� � � � � �� d �'� 7 s��+�y'�v u �'� �� �`''o � �� fn '� � �!,�,�'� �t�r� g _ 0 � e � ��'� � � �1�� J�a��,a�'.� �, �����,�� t '�;�"�., � ' tiK � � �.� �,� � � .� �/" �i � b �' ',� ti � o a,�s. s ,s, t� ; '��"` � `�`� �r� ti Ya �`„l 2 _ L � � �' o z e ��n'�'� k � r i, � � > �° � �� �"P'> ej� � €� } �b f ��t#���� g �Y'a,'£�"`/� a�`�� �� � � � �� �`g' �° ���"'s . ��`��� g ° � � � d o ���,. 9 0� l � � ,� a, t `°`+�„ r GVo�� 1n +' .. �� : � �` �T"�sr. .� '` �3�� t. J g" � � ' t� i ,y {t G,3„d' c� y '3 r .y P�' p .`�.6 e "� 'F � y�+ f� oy � R ' 4 s. '�' � b f` � 3 "` *.` ,'� ��'�'c� � d,r"°� �� s�`x. q x•� 4 y� . DO� ���I"a�� `� ; "� #,;�Y�',� �°f. # 'a z� y � � � ,� 6 _ �' tl P � 3 9 3(� ? A �<�� d� ,y�{� � �� a,�l�� 4 a � " i f; ,t� �+�.� a� a `��'��,Y 3 h ; ( °��F' g 7 A y^ ,��' � �i ` d., ✓ 'b' �' � � y � ) tr'�^y f L� ; i °`@ ��� ��§ 4 � !� J � 1 ° i � � � � ? �. ,� � � _,p}� dr�� ' ��, ', '��i , � � t ' N �, 6a� . -� �� �, bi * r� � ^ d �' f '°�., o� ° � � �` � �- ° �R� � '� t `�<' ' " ?'� ,����� , ,� , `�` , E , ° �;��. h � � ' g 5 , ° . �,,, 9, qa < ; � � � � �' a � � ��� —_- �..���� � E`�� � � f �� '� ��� � �,��� ��t��� �;� s � ��1 ��� I��! � �a� $�,.'� '� -r� �� �-.� F n y y ga k 4 $ ��'�a p .j � ���� i � �• � � ,} 3 � � '°P a °� j } a .. . � �, C` ��� � v ° '� � � �t"' t ���� �� °§'� [ P� � � `� i ' �,y�"� ,��+Y '�''�r� *� p � �' � ,,. '� ��.��"� a � � i 4�� 7` e" � t ,� � p � � �8� � _ � Ft�� � ��` ��a�t, �E d � . Y a� `'�„'��`•,, � � � �� � �•�� i Y� y , � '�� 1 � x �'4 � p. b -�{� � , �..t 6 „�h � '�.� ��' "� � y �,. 9�' �" t , � `�. _ , ' S� : � .�.� � �`; � i � � � � � � , S'���� s"' a ��, a ' � , R g� . � �� o �� `e� �, ' ��St� �'�e �',�"� � � � . � �, � , � ,q- b � �� � � r, �� � �,s � � � '� � �y � � y p �_ �J � � , � �� a�� �`� �u o p q � gr„� � �� e"'�sC ,� . e �� � . �� � aE � r �� � � 7� � / s ��,stt.r��y , . ��` ' �� : { • � "s'� � ��� ,a>r �" . a � D � � ���'�� r a t / c �i � �„, � � '° �� ,df',� ' � � � t" �` � � � �'•�ke �?� ,� � � p � 4 r ��s�< � �� ft� `�, a �' � �� � "a �.� � i � '� . 1 � ' �a� p� g '� � ° F �,` 3r � r 1� �° �'�� � � ° °� R e� �' Y 7F "° s �„. c . i t r, t' t ��° `% �� �e w � ,P � iY' � � � � x rv. ! � (.R . Y �� � p � f �' s�, i ' � �� ; � 't l' � � k'^� °/,�'���c � .�' e 3ii g j r �.s° � t ° t .b � x�. � cn y,� � y e -�"„` d '� � a f 1 1 ��s .°'B � 7 �- ��aa ��' � � �� ° ��s �r��'� G'� �[� '��' 6'� � � �3 � y s � � {�?�� '�§ y „� 8 a S t � €�',���� ,�p� �� + � V � i �3 � `��# ✓�t°' s 1 � q � � .a�� � 't/ , � b r .. � � .R �� a g � � ^, s '' � °�_ � "3 b L.� �" o g�i � �}� � � a � " , > z ," �, j � �, � �� w � �r7 6 rS` � ��"�� 9� *� � 3 �i�`( g a� d� � t � � #6 0 ,� �i" � "1 � d� � � 1s� � � a w � � a � �� � �� � �� � ° `°'�°...." t . L � [ f run �i� E ^ � v � �« � 1 t�t t� � i' § 4 #� ; f � A a d V 4� r ���` "�� � � ,.'� � �. � � � � � � � '�+�� � > �, a � ; �� A ,� � '°��� >i,�#`� � x��� � s f ,.� o � � ��� �# . 4 � 3'q �� � �" t t p r � � � �� � �� '`���y^d��.��z�f� � >� p � �{ �, �* I � � " �� i� ' u r, �rPF���I � i�i�b� � f +"a` � g ,� n � � 7@ grc � � v��� Ce� �# ��������� �� x &� �� y �� � v� j) ,,.� „� ^"• .°E � � �' � � r `� �'�P � i � \' � ` ,� L � r ? �+� � � ,;�^ �'t�'Vp" � � � t � � R m� � �� k Sa�� �/° �� 'r � � d¢^ r �exam�} � � �yg J ..�� � �iF��` �i+ � s * � � � a °` �. �" '��` ��a� � �� ..ry. t i a � i �� � � � � � a� ' a s° � � 4 �� �t � � � J �� � � $ ' �` � '� � " � � � ���� � �� � �� �� � � �S A � ��� � � r � n � t < e r � yd � t � � � , � s � � �, � � i t 6 „� < � � e �r ,�+ �.m �i� � � �,J�' > 'tg �C ' 3 � � �i . � ��,�` � e � � � � , � �� �� s:t�' �� � �r �� � � � � �f � ��, , � � ` � � �. ; d t .�, �s � 7� �`� � � � ( 3 a � ��' � Y� � 51A� SIIP� �� �I 4 3 v9 �� y f �� V �.+' f; � �.o ���"+.,�� ` v 1 °^` d.., '�"d 9 i � ���� b n 1� � ; � �� � � � � � �� &� � � �' � � q ,: � ;� � ' ' ■ 0 � �c„�.rf o° ���. � "" � 9�` � m � G �� b � �£ ��1 0 I � � ,� � � �'"� '� ` � ��� . i� i 4 � f I � !' �� 1 4 i � I `w✓ L� � � � � � � ' �-..."...''� �1 � � � �� � �I � __� .� _ _�__ _ t �` � + � a "' ` i a F � R �� t t � � i� � �� � a � � s� � � �a � ��a F ; 4i 4 , ��yt x � � � t �� � � t' � � �"� �' 'd � F N Y� �� °✓p # �s �� 3 �+{� x 3� i k� �€ 'i � k' �Wa %t Y`f i ,.��; � i ; � } 4 y N �r { �� t >, r a� � � .6, � a �+ 5 a �,r� � ��1 �, a � ,� � '�4 ` � � ti� e,,� � � , � �, � � � �` , * �� �s A ' � � ' ,� �! �� � �� �.� s �� „ �{' 1gG � s+ ��W ) r �k�t��Y�L� M Nl � �� k �.� � �: �,� , :��.�� � �� � ' ��� �� ��.� ,��; �` � �_�� �� } ,�,,,_.` � s *� ��' � �. ���� ��-3 <�� � o ' ' � �: � ; �� � ' i�, � , r� � t= >'� > ,r "� �►�` r x� ' � ,�,. �'Y � " ar � � �� . �� x r ! � ; � i �� � € � �, ,� +;°�y,� ,� � � '; � �� � , �. , , k � w �� ��3�' ` ��A ��� � ,� LE r 'P ` �4 � � . � �✓ � " �� - ,p , y � b i � ` � ",'M', 'X� «: X � r ��$��``�� *d r� s � �+ '.�' 4 '�y '�s + � ' / � s � � � � �C � k ""� �a } s��' � y ��� , o- `+�R "� �. � ��t j � � f f � �1 "+ � � � 1 �° �'� b'� � � a u �s,"�+y�� � a �.E ✓ "f�' 'n� F TM�� .� � Y � F �. �� � —� a � K '" �� y � ~ 1 � � , C < _ �. ��, � �. ��, �.'=�u� _ ;; t ''b � "� .> -� Y � � � t �" � � '� � '�c� � ` .�F , = r `��+.'"����„ '��� y � � �.�,-�', ' � ., .� � "v � 7 °�',„'�.' "' ,g c � � j d �� •� � i' � �� , ��� � � ^� ' < Y �� � 4 � `1 1 �+�`'• K ' ,� a r... „_f� � � � K�" � •� � � s r � ���� ° �(' .,.'�} --Y^ �ft." x v � t �, .�' �� 'r� � �fi, �, , � �:�k � � � y �� y � � � �' • ^� , � ;, , , �a � � x jq " � � � � r � � ��� ��� �' ��� ��� ��� � E � ' „�,. ry��� ��,�� ���* ��'��'� r ���i Yp , ,� � .� x r 1�+4��� ¢ r „ �, ' � X a! 7�� � . �* � � , � �. ,_ �"�,+�" ,� � � ,�` � s � r` � � �,. s . � ��.� � � � � ''� �, ' �� r' � . � s a '��' � a ,� �r`�;� r r 'a , . � �C��� ' � `P,�� ' �� � i $' � 4 � +� � � � . �� � � , � � � ,''R � '��� "��`� { � p '� � , s �;�� a y r� � { ��F .1� �. i �" � �q, � � � S !' �y " ro� � i � I 4� { �, ifi � � � e �� � yy � ��� �� �9 � � R O r `,A�' t R Y ;. f t. � } 9 Y� } � G F � T e '�"' , _f „. ! � '�9t M "i d w s � •_ � ' a ,� "� '� �� � � " � � '� �� ' 3 r� �}� � » c t �e ab Yi` �� t�.. ' �� M i � ` ie 7� 9 i� A M B ��� �( x Yv i� a�� i s �� � � ;} ��" ���; { i' � �� � 1p � I � � �� � ; 4 � �� � s � ' ya � � X e y �""^"! a 9 � � � � r ��� / +++ v � I 3 N 4 Y� S� � E �. � � �� ��i �} � £ > .T a� b �' ( � � D � ��_ ; �, S � , f � X d + � � M1 ( � 9� t / ', '�,�`� � ;�, ; � �„ � � -�'`. ,(p f �� � I � �� � '�" � 1 F � '� � � 91 d � � f � ^ � I � � ���� I � �' � 1. � k �� �, I^ BR AJY� d �� i � ' ��� � �( < � � d � � ���� �'� � � �� .� � � �.� r ee ♦ � � � �� £ f �� ��� �.� ��� Ylt � � �M �� � � �� � �# t � t I � {��� a �'° q, y 1 ha „ `'",,, y �y �� °� . � �� � ^+� b � „ a . ., _ � �. � � ,� r • � i � � ` ���, � `� � ' � ' � � � �� �° , �` �s �� � � t = ` �>� . � �E ` �:�. � � �� .._. �, er'� , . ..� �i. s v '�3 -� a� , . . .�: �� F � �'���. . — , �,. ,. , � `' g `:: � � � z ' . '.r . I �;:: ��.•+ . ; �+ � � � t{ . t � � � ,.-��'�EC.-�.. ��`sw`� T. � � � � ��� .� , .. ,�� ' . � � . � � � `� t � �� � �;` �, # . S ' . '� � . . f� " � � � � �� � � � ,� �,, ` ,<'� � „�° � b� , � : :;�"' ��... � . ��,„ - '�. ,�` �, n � ��,� . ,;'` �"� .. �.. t � �.� � �� � � � 3 .. �8 ���` � h � � i� R. � _' �, ' T, , . � �r� �-��, � . . � � . . . . :: _. ' . , . . : .� _ �.�� ` . .,�..... , � _�� ,� .. .. W....�� . �� � —� � d' ` ' f � . F r • & . � �z ' � , ` :^� ��5. ... � , J � » .; y �„�'- �,- . ' � ���� � � � �`�:>,� � s � � . . - �,� �.� � .F� ��g�'� �.� .-;. .arcm,...,:�`°' ., w � '' ', . ' , f " � - � x� 'k�'v.Y°' i � � i.. � alf ' � a _ .p� ; .. . • � ,�'�„ 4 �Ae � . . . . _ :'a?r' .� ' � .. . . � � �.. �� �, . � ..�. o� � ;'�' ' x � .. x .. '•-,a�e..�:� g ,,:r^" p �`s, . . � k - � � . �'- , , . ' _ ° ��`�' „ '�4 --, `�4�._ ��� _. �� . , � ' ' � > � . , �� z>� � � ;� - „ �' .a a�' < . - ._ � � � � .,,,P^_ �, _ a =-; � �' � � � a. ,, � � . �� . � � ,�a, �� " : �s ' .. ...II f � s . �'� F ��� - .. ..'".� ,� . ` • s�' ..r, . � � ;� � . . � � , . _... . ., ,^ — r T� .�.:��. � -� � �� , � �t i ' �� , _ ` ��,' �-� � � � � � �. . # � : :� �;,.� � i _ ;�a � � _� � �` � � �H��� �° � ` �. �' Y ��p `� � r r j ^ % , �z� � *� € y *�� sa a�� � � �. � � �k � �'� ,' � � � x � � ,� ' �� j � ;�` � � �,� � � � -- � � � '�: ,� ' ', � �°"� � - � �t b ' � . � . ��a d `Si.�`"t .. �" , ... . � �� • � i ` � 'j`� � � .3 ���� _ , ��,.€ ���y�� ;� T . . . � � � � ,.¢� t � g ° ����� � $ � � � �'y � `� s ' . ����� .. � $�� � �� �'� �; �� � w v �. . .�� . � -• : i �� � � .� I w � r � __ sc� . ,... _..,,.� �� _ _. ,.._ ,�. � . .. . '.. . -._,,.._. � � .�� � ; �� ... a� .,�- ...�' ' ��,�,� � ,�,,. t�3�,a�— m ""`. �. :-� ��� � �, .�aa� :: Y"„ � a "' . : ..; � ° '�� . •.:, � �; '�'� ' . ,: ..� . . , .. .. . ;,.. . < . ;. .. . � � �- - ' G r� . :�:' + ; � � - �.•�-" � �` � �; � , 7 � � a+� .,� .) ; � :� `�' ��a � �r�`�.., � rt�� c� �� � , ,� ' � � �. 3 � , - � �� < < , . �' - � ,. ^ _ ,u�„ a . , �� � ; <. . , ,, > "`� .� . ;a�t` .+�, . �"ae,, -. .�. : , ; e �° e* ; �P� � , � , -..J;Mx �' , ; . � -� : - .. : . . -i�� �. ; , t .:. _. �� ��, w..�' . , �` � �':::. ae „ . . .. :.. .. _,, .. . ,-.. , arw� . , t,� �! :e .,a; . e � .k����..azi" �'„+��f ..�P.. �',�_ . � . t.. ..,�. � c, ..,,.... ..,.. ..... 3 �nt E:��X ��w, �.3` g t� �`� �.} � "i��.; .. � �� � y,°:�3�1, ...� "'�' x.dp,�._n �.., ..,. �§ �'. ��.:. �-;�"' :�.� i1-, aks.� ..^�E� - �. � ; +� , _ �. :w. �. � „�r�, ,;�,. '� . -�°. �� � -� .. ' dr���.s ,. ye: i ; � P� a .•P,� - .;� „y+ x � A„'� �'�:'.a fi'�.• T:� �. F_ :e.� X +i � k ��:� .p A � � '' � "' � � �§ �, v' k �� . "x� �� .a�:. �'�. � � # � .>s� �;�^ �']� s .N, �a� . � ,:� � ;iF. - .,��r : � < $ `,�s > . > `a t , ,, � . ::_ .� �. � ; �•.�:��. ,�. ;• -:� . , �., , ° ,Y -� ?� , :�� � � � �'.: , �� :< .� . & ...:4e db" �� .� � �. .....- ... �. �., f.., ...�...�.. i. ��d" i� � � r a..:, . �;,, - �k. �' p � I.�» :�"��...��'�,'. ' .. "�h . R,. E .. ■ a , .,.... ' _ ; ,. . � .�, ,�,:" - . ,; � , < � ., K,.� ,�� ..�,, � ,.�� `,��� " �,t ' ,�e ;ss,S4�•;� ' �` ."'S } �� '� . T�fxy� �t x �.�. �"�'� e,�w9.�.. .�� -� , `� � � � �^r: �- ��` k . . �., , ,iy6 . �� :� � ;� - 3h`� .. 1 � .� �.a... , � - . :. L'"..:.., �i��#�, .: . '. ,:.......,; . "4 � ... "^�`.v� �'. - aW.' .� : � �t .,� ^'eY� . � � .;� .. .. �.c ryf h �l � .�` :4 �'�� ¥'� �.� �s..,. � .,�.`" ���:. .a� �.�. ...� . ��, �� . � � ., � . � !� .. .. ." ,�:�' a�� ..at � � k �,�.� ,.�,n,, � ce ; `�: m � '�:.' �.. :.. ,-� �- �,� ;� " , m'g._.:._." ,�" ,.�_ , a `r�A` . -��t�i�� . �`: � ,��'. .�.'... , �r, a� �,:�,�,;;�• , � .ar�. ' �r ,... . ' '��i �' : , •; ,;,,, .s �.,, &:..,. � ��` �w �.s ��'�" ,a��, � a�;• ''�' - ak�:, ,a��, � ��'^� �'i.:. .f�� �?" "�-� ' . .. ".,�, _. ' .. �. � � �" .. f : '�� . y �-" _ �„^., t: . �. �. , w�, . �. �. ��a� � � ` � ` :4 �' ' ;= � €a.'�` < :ai^ 9 �y' .;�!^ . , W � �„ - �.� .' �'° k: �;'� " , . .; .�: :i�� . : : �` :•'. ' .��. " ^� «`.. . , +�'t��� :?'� .r� °� '�'r� . '�: ,� ` �,.. � ., � � � . � � ���� � =3.�' �b�: ..,�;ei wiL•, yc. . di'..Aw £... � - -Ye .; �..w�..,y�� � i:�� �(d. � Lf' ..,a... �a., � ' i�b .. ya ..„ � 'Ik� � � -' �� . � k, . � ,�:, Y � � �� � � �'� - � - �- � " � ` � *�< «�c, � � �° � �,.-. .� a,� `. �it,, _ �, � �� �" +� � �v: �y � .��'<�.. ;;. �; �. � �' � �' � �" �°- �,� � ��.,: ` »��' � . �' ' , �, �. �"�??•. , a� .s � �' � ��,. r, •5 ��'� ,�'� � `� ' �'�.,."'� �, �' :,� �Z�,`. �,� � � �A` µ'` �"'�� :'�' *; �'�+. �s� � K° .a.., ,�"� s:• `�a, �"p�:� �� � � � � � � �", - ��:. :�.. > � -�',�M � �" .�.. `�` . ..,�^ - °,,� �,�"� ��e�, �s,,.�� 7 ,%�,. �� �,• 'e�r� .,. m: r . � . , � A�,` .,�'F ff a @ :;�%. a�s "�. -i " 3M , , � � r "�".; � ,�` °� ` `' `�s . ' �. .N .�.� ,�i�; � . .a� � z� E � '"_„��' �ik� � �:�.a �',.+�,. � a 3 .�,�a 7°,� �rv .,�j ... ...� � K. '� ak !�. , > � ` P�` ¢ ' �, � , qa . .. ai. `1F ��^�„ r�, "- at`�a . . y ., � , ��� � '� ,. „ � �' � a �"� {� �' ���°^� ..p�y.N .t �^� �� � �� :;�g'�.: �. � �' :� kA���' �, i � �� .'� �'� r .� � �i��i'�. Yt' i� � � - ... �3, t. ,�� < ._ �d h�` a �,k �:.N� t � ""..a d=� .f,w; ~ ....� ,.. � , a..:� , . � . �, +� . »,•t � � . . . . � .�n �. � .. .-ovp: ` i � , � �e .� Si ,L'��1�y ,� �.� 3%c : .,„. ��- � i ��?, � iO � ` �iKXP +�, . S .« dK+*° „ "� a.. , �. ai � rv'"�r� Ae yy � .'s �� � 'a' ��, µ� � � q' w ..;'T � ��•� .��.�:: v'Raa � � �,� . ��,.... 2' :: �, ... ,.,.. ._ �`. � '`�f'` yX .. ��Mt k �;...�.`� `h'3.�'r" �4` �.^a��41a �. . � � �-€ �..:: . : .�. k ,� N . . � `�S %�'Y�` .� � 8 �l �"� ��:�. � �-"� F' � �, .�E: � ?H.y. �� TF ,�; b `.'� � : � . � .. , .. .. . ,,. t � � w. JJ ���"���'�� �+ .'�, � � ��.�`.9Aa„� ��� . � � ;(' ��� � . `�� � . "a -^ � i "'�.. . . . + �e � ' �,�°' ",�a.� �' � ri� .. ��a � YFi ,�&. ; `� '� � ��� , . ., , , _ �, � , - mx� z �� x � -;° 'k � ` ` F ' p" � =-� � � �` � s , �s > ;< .. � � �. � � "+ ���.• ' . zam�`a' ^� � .;� " ,� � � �:�; . . � �, � � . . �� �� ,�..»:"� � - � �, � �� :. t j . d ' ��§ 9 ^S S Y14,j� a. . a ��`� '" 4 � � � , �'� e "� ' „! � � � - .. '�` �.� `� '� ,� w �� � � a W-tr f � ;� " �� � . � - �t, � �; . � ... r _ . _ . ,. . 'i4' � .�. � �: {.. ��� : s*� � � � � �; � � ` � ' � �„>• :, "[ � �.� .. ��� � �: .�;'� �,. , ... .., s ,�,, � w � �.` 1 "�� • . � �,a..� �. . a : �+�' .. - �`�."� �t`�",� �'�":« rt . , � �,�*r� ',.'#' � :� �Fa "�"`z �e� "� ��. Mr�.� _.y, y '�.,� -... .. i';' t :'g ,,� � -�``:�'� �� :.y- aF.,tk � � � - �� ��� `� .. �i7�k � �� � . � ��` G� � � ;a�,��k,x ..�x.��, '�� � �'���' �'� �,� p � �'�. �•. . . � .._ � —.,_ •�� ��ats.„�v_,, ° �� � !� .x.ax���� �i� � �.�� � �� � �:w � .,. � x .. � ° � _ "� � � ,� , � . . m� � b ..� . � �, �. g i � '� � � ��.. �x ��w �,k 7�+ , . „ ., .:,... � � _wr . � .. � . :� � �. � � � � - .. �r ,.c .. . _ ., . , � �r� � � a ., ... . ,; x. ��� .. v . � - r�PoS `� °9 .. . ,;� � ,.:. ° � �'� .:� .��,� �>. e.. �.., � �_, ,�y `�, �. a;,..' ,.^ . . , � , , ..x, .,.. .�� r�, � ��d .: � � � - � . ��� z � r * " '. 4 . ., �s, �" . , -.e.. � , ; _ .. . �„« � . ,, x m . , ...�, :�. � ri .m.„_.m,,_.....,..-. .,,. , --.� - ., . � �,_ . � �" � `�: �_.... � .. �° ��� � � � � '�� � .M-. �' �' �� ,. ° -�,,, `3� � .. � �*' N `, �' � re� V ' Y �� � .� � � � � �:' . � �'���a... �- �� ��' �.. � .-,,,..._ . _... ;.,,,� ..,,.� �� a � ��'.._ _ .. a� s .� � � , �� � .. _.. .. �� 2 I � "'."',.:.y� `':;.�; . a; ' • `'� .P ,s' " � �� �°�r.. � � .«,� _� . . _, 3*..."� �'. ' �JCn,, "-. �Sk � �� � a :` � a . _ ,� � d � """ .. � �_ .� � �� .:r � , ; ,. ...._.� », ,...... � . . • � . , , _. . � .:1� 3^ f ' x . , _ _.��_. � . v...: . �::. °F^ '_ :, .. . `�. <, �. . _ 'n t' - Ft. f � w. . .. �,. . _ .�. -, ti .. C:.,., � r, . _ y R " . . , �' � a :stl � .. , ..,,, I J �� � ,.�� � p `�� � {' � � .�`:e:a*°�'����YR :":' p l ..� _ �a ` � �C�•::... `"� ' . . I .. . k �. �< ' ». � .> . �t �" tl �.�: . � ., � � �,✓���� � ' �`¢' � ��: � ��E�, e f �� t � `�' � '< �' . � 3€ i ' _ '+`� � `�a �� �g, �" �< < .• ** ;ya %� ... , - � i , � si�f.r a s � � �`��� � ��� i � ���� �� fi �� � ' ���. '� u �,i � '"�. �. ,t- � �R. R �KRY � � «��Po ��� . ���� vc� . i �� .. � ' � . . �, � � �:: � -.a ...• � ,�� µ� � �� �, � ..�, � , ,� a ��, °` w � ��� �� ��, �,� ..w� - � �. �' � � ,, � �� � F - �, � - � ;� �« � �4;, .-.�;,".� s ��� , .+e'�e�s,""� ��km',��. �..c„'� . �.. �,_> ��'n� � . � .,� ,:,�. a n''.. € 1 � � --�� , � 3 3 `�re y a' ,� � .��; � g � �� . � i �� �.«, � .fl��� � a y� � s - "' , �"� , , � � � � � . s � � �, ,"� ;�, �,� A a� ; �' t ,� �� r S. � s �', �°�� � �i ��;,� ��° :�:��� ;,�� � � � �� ;�;`� = ,�;� ' �; ,� � �"' %�� � �� �%_> a �-, c��; � �z��liwai+��;swnevc� �x'�}'- �„ # • � ta �.> °�;' r�� _% " .Z. � ¢ �_ f °' . � E� 1 _ z ` KK�:.-� �m�. ^�..a�?�v.:. � t � k e� ^z ,. �, � �q €.:.� ,. `� c , ��€t . x ¢ � . �I, '.:a � F} . I .�reT'�� � �� y �.p�""ix� �af a� �'� � ,�,a�a .� � ,�& �`r„��'. 'p.� xt,�"� y,' »� + .. . t�' �.�. 1.t � �k � �.=1F!� � ��� ^m=,'�6. .r .� @ £�. -:s<�( ��.,, '� s�i:..Y � � ��"d' +�, '�„"� '� �p .n �3 . �ra .. �. ; , � , • � �. ., a .S b..::� s?� � �:. `�'m^ .. " '.�.. , w,» .,. N ,e..'�.� by '�. 'a .,_ �� , x.t�� I ,� � "`z'�' �: . � . :�".'^', . � g � �.a, . ��„, �.� by�+'� :. .:�., q, " ?�, {; , v ''� _ `- fl i o- Y �xw��"�SSa,..;�.,......, q„.��'_� I , r� J ,A � °C , a �,t�?n � lN � -�' �.z. ' ��� ° p Kn,...a'F�.� �'�•_ � a°�' :t �( �� ..r� E t t » � R . �' � '. :.nq � *u.oYG '" ,��. S� �,... '.'g �F .� . .. �8s_. � . . . , �:k 3� .. y ..�u � �,. (:, . r . . ., ^ - . .�.. q . '� ..��'�„d� m.��'� x ,, "� �:� � ��"�'��r �s<.A :S _ ... "€?y�,'-�R-'�?� . , a�.`'w ��_ ., �. v{ ,,,,�'� �;,�.'"' .._ ..,. ^ -� � � , ff i .L . :�i. ' ..v..�,,�^w'i ' . ' ,z ' ...re„ i." � �� �a�.�y�:.� �y "., '�'.a'�,�fr,°�1.�� '-^�� � 'q� tiz •' � .4�`. �,<€ �� �^�..za �� t�fig ,4�R4 yxj;�,�� ... �.„,:. �, � , . . . �. , g g y � ? �5� .� �"� � � � <p "�, s, � '� .$"�_. '�.° ,E �, . � � � Y ' �A`:y.� � , .q G�, .,.. . � � , . � A '.,.. � � 'S te"' .1 a ^�:�` « s�... � � ���- �#g,� „g� ' '„•w' 'R ' ; i� +� i x � � ` ti ' � �� �� � <, � � � n� ,��" � �. � � � �" � ,� I _ a k r� .�"� � �= _ � � ..� � x .ra � .r` •� �„ .�'� <' >; a° � ',g «'�' { �4 f � �� �'� d �. - � �a a � y , � 4 , � .. r �. . . -�<` �a' �,�r � " �� � � � � �, � ,� 3,� p .�. 9 ' � ., . �. , ,�� ` - �� � a . ,� ���r�� �"��3^' cr�, �� � �� ` � � . � , � � �.. '�� � . . • � , � � � . W � � � r�` r � . - ..� a r�`° „� , �, . � " � �` ;i - . . ..... - ' - E ° . - .. ` � I � ��- ' ' � ' � s��,;�°` ` `�- s � , e�m 2 _ � :� �,T � < tl � -� .�� � _ - , ,�« _ . ���. Rw�`'�� . . g �.� � 3 - • . � . e � I � , .�' i . � . .. _ � ,. .:, _ . , � .,c. x v �"--�--�-- + � � � � �� 9 r yp R k 3, � � �"��"&� � � � � € � " � l '; � ��f� 'd ",'� � &1 � 6 k�4 � "'�„ �+ �i �,�`� k r�` a������' �� It� t� 67 �j ° F rt [j { 7 $�� � � jl' ? G � � -:� �� 3 6 � r "S � g � �,€��yyY r PQ 95 .� y � rn i � .4 � `��*� ' T���� . P �� a g,'�a t � `� � a t �s� `` u � R � €s fj ����'�'c�� �'" ��.�° � � i3"��.�`�f9��Q€ �� � �' � � "� � e `� � e� :J`t' �� i p w r��`6; >0 �i�P'a3f ° v � ,g � e � ,a � q ���t� a ��r { �]� tl P � r$ � � � 3 a � � ��� -� Y� � � e^� * ��� g � �� 4 � � T kJ � � � � L dsev' ��,� v� ; ' � � � , �a � �j �� �.t7'�" � �`��� � �' � °� ' � r 0 �� � `� r �.� � � � `� < `� ' q t � °�` e .� �b' s +� f � e . � 1 d e 3 � E E �(` �� f F ff8 � d � � 9� ( C ad A y �y jg, � p � � � x �' � �M �� S � f-� y �k%�1� �+" �� � � (� k,r"� ,se� d f ~�� � �Z� � � �„'i J p n � �� , '� J ` �� �F � � � q ..__.� .� �' � �g � o d o , �g � � Z' �� 5.s� E � �. �`�# � ������"�� ��'�� ���,� � F�, v� � � � � a � & � �,� §, 9 �' �,,.s , � � � ¢' 'J � t �, '� ��B[ ��' � � � � �� �"¢� � '��� 4j e 1� e. �� o ��f � � � � m � � � � �1 , � c � � � � � 1 °¢� � o �� � ���� �t 2 � _ � e f�a � �i� � '* .� "��`� ��„ °�� � f e`� � y � �b � �F �� �'i �� ��� s +� 3 �� � h �' ,�`"� E t ti..T' � y ., x o � � E � 1 ��' �'��`� � s � �/' � � e �` �� � �,`� � ��a �� ��� o �3 � � � p � ' �� ' ��t� � ��� � � �'��� �^�� �� � �� � �< '�,� a �t'3 y �� a 'w � �ry a�` S� € '$ jR�" " � �� E � r � "�d Q �� j � �p B �� �� i�� 7�'S �y�o�� � f�f_ � V � yr � i] � p 6 1 g � �{' f � � ��8 � � w 3 y $ -m. t ��" f 6 Y p p7I �' t 6� Et �s Y �.�7� ¢ �' �� � � �� � ,� � �Tf° �,� �"# Y" �'+, _ ✓E a ° t'4 .% � r' c � � �q ,. � �� ,,3 � � ,. r 4 � ,�� �S� � ��-� ���.�`��t, '� '��, �r�.,1i 4 S�� a � �� � �� �� ���i i � .,.� � � t 5 �� �� g ^�6 � £�, � c..�t a � �w w �S 5 e i� � � � � � �� � „7 ' �-.�.. ....� �� �,.� ��.�' ,X ,�i i ,�, ;„ t.� 6d'����&� � �� a 4 � e �k F 16 � �� o � { `3 � ( � � � y � y � � 4 �s ������` 4.€ t t'y'�E '�,.}� � L`� 9' � i„„ d °�A � a. � , � 9 w� . '�' 3 �� r � �. `(� �? 4 � '�; r c,,� � ... � �� Yth9 �` j ?' 'a .� � �'� � f �" � �S �'. � ,...y � 9 6 � s 4 5 6 ( � � � r �, � � t � ` � l' ��.,'^'S �' � �' � �� � �. � ��'} t 7 � � � � � p, � � �� � � � � C �fl� ��,`` ��� � '�,��� � S �� �°"'� t ��� � � �� �� �� ��� � �� � � � € a �� e i s� �' � � _ � � s � ,y � s s� � � � � � � 4c �'" � � �'b 6 �� � �r ax a ` �S, � � } d � �wa�� ��� � t° �.�i � �f����. � �'� ' � a ,�$ � ''�� �' s g �. P � tb k�` � � � � �"�, ��L3 �� f `� F � � 3 ,� � �� � � 4 � � ^� � � �� � �a ° t"% `�'t" " `y � � � ° �� �� � C.� � 3 � �� `� r � � � � �u� � t,�� � 'q`'g� �'"-,. -� � � f>� �'n '� � �g � � �' � ��� } � ��� � °���'' � � �°�S ���,f � `€� �� � �� ��{ � � �'d � Q F r t L� � � � m � � t. , � /° ` q . rr `��� � L c � °i � � g '�.' 9 $ f� r4� 6 A � ' �^,� � « { �,.� � k�.�� ��y t °'�,� _ T " `�p� � �� G g� F � F �Fy �t � f e i 'e `''� 4i i' � -� F E� 4 4'� '°`��� � � _ � � ���, � `���� g r �' j >`4��` E , � � � s� t , € � s� � � � � �� ` ° � � a �"�z � � ��� � � i� � z � �,�. � � � � � � � f '� s.0 {, i� � � l,q}`�" � E ^9 /1 { � � �4 '� v r�S i � e ° Q � �' J � "� �� `� � ° � � ���'� � � ,9`� n °��c"� � � � v � °�` ,� � i � ' j � �. t� � „ � e � t�.'�w �, R""� �`� �� ��a °a , s�v� ��^a:. ' �, �'� , �� � � � �"� #.��� �, � f c � " ��� � �� . � i t< .-[r +rG (° "' �' � � � p` �e3.¢. y� � (� a� F R�� E P3 � F e'" ` � � .e.-a � �+ �� �y 'a� t ° � � w' °"" � � 6�� � � � 4b 'y " ,�` ..� �7 ' ' F�'�` ,�� � '' � "�"�`"_' �"' F. ,.s„ `� w� s p v °}� ` �, v��,�`� ��` Y� `�E r � ,J "� �1 , g�' � .,A y �'-� "` =�-�:...�„��,,.,�t!,.,...>, .„� �, +'"' � � { N �t� �*."Y y �. '§ ��,- � �7, ra�_ � t kd Pa9 '°m' �: t , fi ` � � � �� `� �� �f� 6 e� .�� � P'�,� 9 C, f � y ?� .� '$ k) � t 4,,y�r`'� . � t� � a (4� � ���� �,��� �`�°'��-, ��� � r� a �y j ca le �'� t .a^' k''., �� € � ,+``°�'�* `�� � � 1 .' r lt� � �„� ✓. @s J �1 4�'° r � � � 4 �a+""''� � �'� � � ! � � � ` � � s �� '� ,+�# 3�� �°r� 1 �' -,, i '"` � �' "` a � ° � i�_� � `'�°�„� "��� ��� `' �"> � � ` � � a ' � p; 6 ,., ��x �4y ,� �f � ' y k�' ^,3 5 m 3 F� � /� � � ti t 3 p � ,�� "� � � 5 Y� � '+ � f �� q,/ s q ,,� � � , j g � �a �� � F '7 �� S � l � `�� e s t � � s �� �'a[ � �t' � f3 � a .. � 9 f7 $���s °""` � � 4' ,. ( �� 4 F y�� +� gs� �� � ��� � ��� � � p� � ��� � � � � ' c " � � � ` �' ��� ` Fa � � �� ,�u � � , � �e�_,.. � c�e�`� � ' 1 ° � � c � ta `'\� '� a � ` � �� � � � '� �• � •-*� � Q � ,���' � ° � �e°� � � l � � ,, s o "� a �� v ��,r � E� �'^<.a���� �r �a� F �� y �� � � .�' � �� � � q'Y F��p p a § " � 4 � � � � � s � '°Y°,a � 3+ q' � � T 'd�ra� ' 4 <) e� i° � �'� t � � � �8 � 4 & * F � 8 6 d 8 � ` aN � "`� ����",�'; s � ���� ��'?�` ' s �''� !� " pkj ��� y � 'it � � � g������ � r E." s .,���`� t � g f a �� � � ,p .""t "" ,a � '� �, � ������;°' `, q� yr<a fi� �d� �°' se�� � � � �, � �'�f „� �,r� �� € .�° a��a n����c a� � � ] ; * �� �.�. `� f` f? �' �6a x �t n ° kt � �� �" � �� � � � � ` � � � � � , � . � s � � � �� � } � r, �� ��°,�f' � �' e ���9�� t � E� � �'� o-. f eG� � a e { � Y4 x`W-'A 9 �4 .. "i3 �..._ � �� �� ���..> . � z m ��� a ��. r � y � ��},,,,. � �_ e � �� v �� � '�� ,. y � � p, � � j ` � � A � � � '" � 4 S7 � ; - ° 3^'1"�r+eT °"�" d � � � �� a =����� � � � �� � � - ,�� �«� � ` ;�,� "< � '`� '�, � � � �� � �� � � p � �� ,� �' " ; �.� r xx 7 c� °� ` `� ,.t � a ¢ � b' � .�' � ei� �€..�.e" � __ � C; � �"° � �,.�^°-� �,� & 9 3 4 � " �W "�F �` �� av Y 'e' J d � k� � ° 'I f'�� w e � -`� �a�}.}� w �"�� � ` �� � � > q � J � �� ��� ��� � � <�� � �G �P � �'� � � y ''�� "� -� t f c ,�," �. r � .. �,,,,� n �j r � � �� � S � �.���, �� � � � �'� � �. a � " � f� 3 � (/ `� °, e � �'t�' ✓� 8 f ��1 �� �� � � '=�a ,. ". ' a:t. �,a s, ,, � � �j � � �: a � �A d � �� p@ � �"� � ` � $ ,A � � j �P � a � i� '43� d e' s ^ � 1-0� �� If ^� < n � L = � d � 7' j � i '" ����' e ���d�d 3 E� a'''� � �f3 �+, a � a � d e �7 '� � v� / ' A 6 �1 3 �` � ,� � .. ��' � � nT '�� '}`, �4„ � , 4 ,y, , � f*' F ° �'[I '�+ �� g ,y ' r° ,�. a r `��`$ ,� ,°�+�����+.� x����'�,'�� 61 4 , � `�R �`� �, � a g s'�,� F 4 '� ,.�" 4§ �,�"_'�p 7 �� � ��'A .. � -� � t�t >ff 6 �`"S � f! a � ' fr ��a f -� ' �°� � � Q ,-, � � � z � � � E g � � '�� d � Q a � „ a � ,�, '�� ay � � � :. � ,°�.a+e y �� � �. � ���dr � � �`r✓" p���� v � ' 6r� 4 � � 5 � ��� � �,�� � �'`��2i� sy m o �. �� � �,-.. �'�„��"' e�� t����� g 3���� p �� .,� C '��'` . °y� � a �8"� � ,� '1�' @ '� °� t � K7mv �,� g c �} s �� } �'£ � ,wa � y �- x p � � ±� " �" p pp � o „ � p� �� 3 � �' � s � "� 3� a °e '" ` °� �9� � � a d b � �9" ` � � �, � ,� �a ° � ,� � � � p� � ` „�gl ��„y` �,'a �. , a��#t ° asY 3, � a� �a U � e � f 8�,> S` a� 9 r '.ffi s.r���d1 � � e rfi.5 � F.� o � � ;� `t� a c . 7 � i s � �'., �, ' s� a�� �� � t, c ' � y` �" ��a' e � ,''�� � � � Q „ � �E,'� p , � � � � �q � � � 4'� �'�i � � � ��`�� "� � t � �' ` � a ,d t F � � ,� � + , �.�' ' -� d ` � � � �- y � �„ d , `� � "� v �� k���,�5�r,# M1� .�' 4. ` � , l A ° � &� d � � � (q � @ � �" � d, �4 ���'`��� � ��� ��'��� "�a��`=����`s� �'a � ` �,�� �� �� `� � a� � �� ����j 0��� �� I I� ' a � � � �` s �j��� a �Y ° m , � "° � °t la s� � � �' � ." ,- ,s .o � �� µ � f 'S 9 � q ° � � \ � � � E LL � P$ F ° �e ,� �� ° ..G � � F�' � ° ,� � �°� o rv � �, �� � F � �E'� i ,�"� � ¢ a � d� � �. a �. � � k • �` �B ` �' 9 � � p 4 k � ��s �p � n � �* �� � �e g• � � � �� � 8a � � �,a 6 � d B � a � � H' x � Fn &' pp�v � � ¢` � �Y• . ¢o ( � `se � 8 , � � � �.` c� e � F � E �� � .. B � C sQ � � �+�, r� ` � „ � �� �� � � �, e , �tffi � pg *'� � �� �t� � 6 t � �A � � � � ^m '� � �,� � x y,- � a � � � �4�'� "�w � $ �.o�Y'¢ 8 � � �� �����e � � �`� ta� x�'� "�� °�� �, t �� � ��ro � ��� �,rr..�� �m �e � i' � a �Y, d4 � �a � � /� � -t � ''� ' � '�b n ffi � � � � tr �� �� ��s �e � F �L �� � � d � � �` o ,� � c� e� � � � � r� � A � ��� g e � � � "a 1a a � p Q � 3 x ° 6 a �° � � �4 ' � � 4 ''� � � .„� � o� p�, $ s � � ��i � � � �� �jg ` � 6 � ��u s +, o ^�.^�+s� A 6� � � o , �. �' ,�� ..m �� _� � � ��' � ��,� , � � �.� � s � � �� � � . � e � � � � � � ` � t � *3 � � �,� � �, ' � �, � � °"� y �� ° � � a a� , Q � � y,.. p ' e $ 04 0 $ y g � j , e � * � � � � �� � � � 4 " �' x f � Q � r, g � T�� � y�,� e. ` � $ � � .� a V � a � ,� �'�� � g � �a. '� � �� �g '� � �' 6d � ��. �� � � ,� �9 t � � ���,�0�7 '" � � r, a� � + � `�' c$� $q. .� � �" g � � `� � f °� € �F" r ° ° � .. « o Y � r � � � � , � � a 6 � t� � � �� F °� � p ba � ���� � � � w �$�� �p v E p �� � � ° � � � �� �, `� � � � � � � �, � � � a� p �� Q a 4 q � �. R k� e � e �"�� �a� � � � � � ��� � � � e�� � ��� � � °� � „ m a � � � a� �'S�' 7 �% �' �� �' t � ` <�� 6 � e�"� ��` ' M a s i � �3 ° �'� � � �� �� �a z �� a� .� �� ,� .,S 8wo � �.�� , � �a � ,- � � � ��� �'$ a (f � � � �°'�`� g '� ° � x t t�� �' � �� q � f '� e � e � � � ��� � � ��� �j R � �°"�a � ' � <�t � � �v �'� ° ��� � a��- � � �� � �, — ' � � c �,� o � ' �� � ��� P � � � ��k ,�? . � f d 9 g � d . Q � m�� "$ 'f� + ` � o � n � � µ� 4 h 9 g °� Laf F� �t �; �„" NR � ue �/n q g tl ~� p ,� a �" m �� �� a g, 6. � � �, p � 9 � $ �- *� � � � � ge.d d � � � �� z � '"',,}� Y d � g � � . � � W � �' � C� � � � � & ' � ������ ���� � a� ... �r� p * � _ � � ? ._ g � � �� ��� ��� �� Q q � � � ' p k ��� � � � � ,� b '��&�'� �� �e�A�.n 4 ������ i ; � a � �� �� � � �' � f �� � �� ���+ �� � � � �� y� o s � � ` �.. a�» � �, a � � a. �'"� ,� � � b e {,." � �pw'� � � � os k � �� d 29 ��„ � - � b` �, s E 4y � e� � � f ef � ' ,�a� � � @ ���'j �le � . p �e ,' � " � z "� �� p yxl ��' e � p � � @ fi �b F�� p '{ 9 n o t d tt� e+ � ' �� �� r 4 k r � � �� t a. � , � eaa '' � � � '� h"�.� '� r � � � � �� � �� � �� � �� � b � �� �`�°��3 � � ���.z �'� �� �� f �� e � o � � � ° ��$� � �- ������s� � . f < "�� ��` e s � 0 a a � � � ,� � � �" , 4 � � � � ��� q �� k� � � � b � t Ea 3 r e � � �� ' �� e' @� Q � � y � � �$ P y�a � n � m` �2 ,� � � � � �'°� ��' "�t�?m '�`"�" i � � n4 E�. � � �, � �� � � °��� ° �'t;�J a ,�. °� +r7 " � e <d � 2 `�y� � �� � �� � '�� "� $ � d r�,' @�e ��,`§� s � � � � 3 � � � ° � � ���9 � }� � � e P � 8 � �' $� A °� � �b� ���A G � � a �' m£ ¢ X �° $� '^ W � p �� � �°� �� ��� �.� � � � �� � o m �� � � e � � , d , �. 7 � ��� #k4 J'P �^� �� P ��� �r, p �8 � � b w � 3 � � . ds�+9 e � � � �� ft� } � � � d � '�� A@ e � � � 9 � E �� 6 @ # � 4 � " f � � y„� � � � �� 3 � x4� 'F' '. ��, � �r ��za �s�e. � �°�e � ��>a� e� ° �� , M� �� .g� s � � r'�,�',� � ' a` e � '� � �i�� 'T� � �` ��� � � F t 3� � a� '� �' � ��� h � � � g � b � � � �3 � � � �, % R� � tr � B _ � . ` � � , b a ¢ � ga� 6 ��� � � � � � o- � P� . q�� a s � <� ��` � r � -� ti � � � ' �.w' � < � ��� � ' ti��� � � � � �� � Y �a � s� � � 1 Y � < < � � , a � R � w � ��s 7 �� � •� � �' T� ��' �,.. � �,�� " �' t ° � �� �� : > �' � � �, � ' ��� ' �� � ,,� i.� ����� ��'�'< a ��� �� "' °`-°� a § � � � u,� � .F a �a � '"�,,,_ 9�� m�" '�� �� � � af � '� � �� � �a � � � 9 e _� ,�„�� � , � � ' �� f� �� w� � � ��_ ��, e. ,�� ��,� �� � � s & m, �� � ������' � ^ - � � ��w �"� � �� '`-`�' `"*� � z � ` � � � � , <a a � � a "� � � �� s � �� � �> �� ��� , � o� ° ��� �� �'� �� � ,��� �� �� ��� ��;�'�' �'�� � � � � ,, � � q �� � y ;��' ��' fl��, x � 5 , ' 8 � � ' � � E v ��r � r� p �.. ;+ e� r � � yx�.A a � "� � � 4 � ` "` �' � ;� '� 9 �x,� � n� � sr,�i � � t + � 8 � .'�� � ��� �"° �a �� � � �i v r � $ � s �� �� q � x�s �e8 > "� '��� �. �� i� �. � o x q �'� � ,� 5 � � �p $ � '` : � q f � b" g � � '"� Z � J q•y"_,�� 8I � :..,� . � � $ p � {� �; �. ", 8 3 Z �� � . � s " s � �g s � � € � �� � 3 � � " � � a� �� � �"�� � � e� � � �� � ���� 2� � 3 � 3 � 9 �� 4'� P q � s.r�. �� ��� �� E ��� � °-�{�° 4 {` 0 s @ � E " Sj �' � i F�.b r����� �' g 9 5 � 5" 8 g g ,p a '���" � ��� ����t w�V ��.dy.��� � �� .,'s.�w� g � c Pajy 4 `. tQg k � e a p � 9 C1 F Ef q� �e �� � � � k � ��< , �� n =� � ��'�` � � �'� �� $ ° °� � � � � � R � � �� � � � �0,, �. r � � � � � t 4 9 � � , �� tl �d �2 � � � �� t � � � � � ��,e� �` �ti,�� � ` �fa � `� � � `� � � � ., � _ � � ` �� � `�-. � � �� � a � � � � � � �.��7 ���,� � i ° ' e e���� � � � �° ��� q � a ° s n � � � r � P "° � g 3 3 a� "� �i $ p g , � a LV � t � ,q � � d � 9 � �$ � � � � p� � � � � � � a � � t '� a� ��� y ,��� ��� � ¢'F � ip.�'��' tn .�g � A ,y, tY�� � 6 �� /,� � � 2 F t a ,q aw , g ,� �. � f � n w-' d f #4. �'» Y � a *+ � ���l.k � 9 � .� y '.5. °' ��' Y �� »� �§ ` w ., b 9 ., ..� a �'� �` �P� �;��� �,q�'� e � � ° �p d � � � � t m � a �<� � � , �� � � �$�� E�;���'��� ;���� �'����� � '� m � �� r p �� y "� � � � � ���� �� � � ` � � ' �� .�P,g „��� �a �s ��� ��§ t j f g a ,� � E �'�T� �`� Cs „� � � �er7�� _ �.�� , � � �. ¢� c ,���cs , 4 �J.4� 4a g G ° Y� ° �9 y�a �6�, '� � �—�` ^" ��-� � ° r � � S � a � y g �`� - '-- -- = _-- _ - "`°�� G �c �- - - _ _ _ _� a .r _ � --- — -� = �' _ ��a � "? � � � g�tc ° a �� a � s� g E v � � �`��"�,'� h� �� a �� � t g � a � k c �' � � �" �t v3 �j `� { �� w # +d� � @ t° � � � �.9 d P � b & � 5 5 �" ��~ ' � � Q'� LL`4" � + P S � �` � E � � £ �ers c,K 'a, �� `�e. � « � � $#`' �` � � k ,. $ z � � � a` $ � �' E � '� � , l d �' (,�°") ^ °�E 2� �'p�`��`��I� �t R `�,5 � e°� .� �� �+ °��� 1J � � �'* � yt � a g ' e.�'�,� � '°�t� k ����� .� � � � d �' *S1 � � � � f ' s.,,_ � �� �� � „'�.��� 4� � � � � ° �� �F � ° � a� � �$ (3 d ��°$ '` E �" Y r� s i .� � � a �i , 9 � `'� �d , r < � T'� €�7 "� � � r' �"� � �, �,� �@ � �� ��� �'�° ��� �x� e �S � S �~ ,� ' ' � � r�, � � � � r� n, ' � f '� � ��� z � � t�'� � tPS � �°t � .�� � � ,� � 8�' " �„e � °r ';� c�� eES �'c�,�. ° t�� �''�` ee,$ ����� g` ��� ��a „�' �v � �,,�'�a 2 � � e � .. },„ °� � �`����s 3� . � • � � 4 � � ' ".q r � fp " _ �, ����� f.����s� f l � 5 � � a�� �i a} 4 ybb 4c �a � p� � @ �� � a���, ���3� `d � �� j� � � ��+ 9 � � 9+& ,� � �,.� 4 �a ' 9 � F� � +� d � � c � � ���°� ��� � .s a ,. � ., i � � � � � S `� � £ � �@� a � �r�^.��y��,�°-'�'` � e ''� � � a � s s ' 3 � �eS �" � �' � �� s� � d.� � �'' � � �' a a � '��s� � � ��, � � � >� � � r �� � , F� ; � � ! �� '�°�� � b p z 3 c � � � � � ` �d �'� � � `k ��T�' '�,� ��#� ? �j: �'� y � � �m�> { i' Y � R� 3 D� v 53 �' P 3 ` � "V 9 �a � � � `aa � $ ra '� v� �� , � ���t, � �� ��` � YD` �� +@ � t' d"� 'e & mNO.e A A Q �'i F ��� d U. I °F �� �P's _ ie �3 �, r i� g � ' � C�����.�r �t".,D f ,-'� � �T � ' i Q 9 � � 9 $.�3 � D Y „ 9 n V' 'Yrk 4P �r,., t k ° � ' � D '3 ,� � G B 5 �+E3 t by , �� � `.,� � � � � V �`',�' '� � � i "� �' t, �'�fi € `��'5,,, ... �p��«� j �� �.� � � r�, �� `a`� ,°``„�`� �,° �� ' mt � � p °'•� �}- � a s �� � � �' � � P _�° ,�`, k$ f 3 �PvE �. � ,`��:F .F e t.� �° e V � � � P 4 � � � � qF �� '-t { � �" ." P �� t �1 Y ° � y � w'� q � .. ��� 7 L � �la 7 � � i F g� � � ��t, f° 3 S$' .f d � a 6 e ,�'� ��, e �✓' � J `� � � � "a�t 6a � n � _ �� � � � � �'�` � ��t � [� � , �� � m ° ��.s � �> �,'`�„ "' a;� i s GIf' Z� t1r � D � � 6 � Lz� 3� Y �.a� - �.z { n An�, � + � '``� a �� �.�n�� ��� � � � � �� �.�,�d� � ��§a � � � r a S+ . ������`� � � ��� � �6�� � ��� �� � oy ��° `-�' t� °"� p o ��� �5s "� � `a E� �,€ �`� a�o� ' � � y � ...� � r > ��� ���� ���� �� "� � " ' �� � o ` `�` �t �a � �� � ��� � � a �1 f � C 3Y A L � � b ' � V 4 ; ' tt � � �"D �� `K � �f R9 q eu p k � /� 9 +� � �4� >'`� `*'.� � °� z7 �`:� � � � � r � � p a � � � t.� w �. + ' e,a a � e",.��r��� � �� �� & �,i k } j o t'� �`� �� � � s , �>" �-'°�,s€'r � 4� "� F7 . � t� a . 'L S* c � � � � � �; �� � �,� `� � � � ��� � � _ � �g � �� ,� ° xo' � � ' n] A � £� y{ � � ��� g }a_ e � �� 5 �3� . �C� � E�a ��' �a �� �� �� a 1 �'�`� ����" � � j �e� Q �� wy � r `t� ��' ��.��� m �y�r.e � �' �fYO�� � � �� �"' � �° ��� ����'1�"�� �t� � � 'k�"a� .,��' � � w g ' �'v ` °` " a+. .. `'� � a� '"o � � � �, � *� � ��� e �� �� a � � �� � � � e -�'m � 2: � ,. o ,�;a" P `� �3�= �` � t� w �v� .. '� ��� ��� �� <�,�� � �� ��° � ��-,�,° ���� �r � n � ,d� � ' � � 6 ^ _�ur f & v`���1 � .,„,�. 1 �9 �� q. � � A � �y � a � � a J � a .d�l ,n °�ry F„ pfi,� �,� a Ygys .�� �� ( � ;� p �, � F � e� �� � � -. ,� � ° � ,� G:b'% _ �'!" t �'� � � ' �' � �� �� a�� ����"(��3� ������� � � q y � � .�. a ��� �T'� � � u� ��� � � ry ' � i,�'��. e� a °� 4 �;. � � i 4 p 4 [ 7 �a �i� ,."�, $�� � "i r �� � �� T° � 4 �� 6 � J �' �� �fd��e � 6JO m ��? @ ( �,, �€J� � Y� a, � _� m �u� 6 p�;� 9 �e� t �'a,5�"� �� � ���� �� ���� fi" g � � � � ��� � ���� cs � �� ���sP� �' � � � f �,� a ""�) � � q � � s g `�� �,'c�4@�����j��� ��'� 7f ��,�� + •� � N � � �..-'� 6 " � s8g � ��� 3 � � �� i � �4.r �� A'�' g �' .b� � ���' ��€d q � 6 � 4^ � �., � "' � � Y A M k � a � � � ,� ��� �� �.� Pp�� � ��'�'�`i �' ��, � ' � "` �f � " e � " � -�'� � ¢ ��� � �.� } �a� �"� � 4 � a � � , � "a � � �* ,� � �,� fi � � �' ��� � � ° � �a'� � °�� �"�, ���� � ����� ��� e �� � 9 a � � � m � ,� ��� ���� ` �-� � � � � ���a�� � � t � �,� � � , � '�`� � ��� �� � �;� � � � �� ° �� � � � �'e� � ,.,,,,�,.,°�'�E;��a�� ��", �^� ` �'�'�. � o � � � � em _ � � ��� r �'� ��� ����� � s'i�� ��� �°��� a U � � � � � � s ,� ,� ��€ ���`a �� ,�� �P a s '� _ � ��� ��°� ��� � � � , � ��� � � � � 8 � ��� � � � � �� �� � ' �. F � �� e � �, � � n� � a f� ,_ � �� � � � �; a 3 , � ya>� "a'� ��'� �� it� €" � ��S �°a�,.."'��.�. ��P r � 'e� � � � j z � � °� n'L �, �} � � ��� °� �' � `��, � a �� � �'�� �,� � il " " a#'� "�.�' �.,,,' ��° .� q � q � e � �f �� � � � 4 'd 7 � e� Q0 �� a f $ y �..� '' p �� ��� � � ° +a'� ��c ��� J � � �}� 6 fi � Q � 8 � s , 4 �� 0 � [3 � A � B � �fb ��� �.°`��'� �� ��m �� �° � � k � e � � �� � � ` �� fi �+��, � b a ` � � m a ``�g�� 5 � ��� ,° �^�",a �e�� ` s � � �, �� � `v ,� i i A :9�� ° � a q b g� � fi�, ° R � s ' _,�'� �, � �'� ��°sa R ,t�� 6 Cr � ,k" � z � �� �r � ej i� L� � � APPENDIX D I SUMMER TIDE SCHEDULE FOR SINCLAIR � INLET 1 � � � 1 � � � � 1 � ' � � Q � , ' THIS PAGE LEFT INTENTIONALLY �LANK � � � � L_ J � �' J � � � � � � � , � � � � � ar � � � � r � a� � �r r � � � � �r � � MAY 2013 SEATTLE TIDES Sunday Monday Tuestlay Wednesday Thursday Fnday Saturday 6am NOON 6pm 6am NOON 6pm 6am NOON 6pm 6am NOON 6pm 6am NOON 6pm 6am NOON 6pm 6am NOON 6pm � APRIL � �. � _ �w_�.. _ [ �`",� � _, `> IL i '_ b'11 ° ° r �'` �'o ° i � 1 2 3 4 5 6 �-- ---�--,f- - �'e-�' ---�--- �., � ` 7 8 9 1011 1213 ��� �� � A T m �,� � 14 i5 16 17 18 19 20 2 10 18 25 31 ' � 21 22 23 24 25 26 27 4 25 9 22 410 1133 5 46 1 D 41 512 12 33 7 06 1212 6 20 1 27 810 145 7 30 28 29 30 61 93 07 114 58 66 Ub 113 46 82 16 113 34 83 26 � � E t 9+ « w t — _ � '� _ ` � � ` A � � 4 � � .f., x d � � � � � i. P � _.._ C � � P �. ° — + r b t 213 9 00 3 08 8 35 2 53 9 42 415 9 34 3 28 1018 510 10 26 3 59 10 51 5 56 11 13 4 31 11 22 6 37 11 57 5 02 11 54 113 22 88 35 113 10 95 42 112 02 101 49 110 OS 106 54 t08 10 110 59 105 -12 , � F � f � � ) } j j ,.. ... t ... } .f,- ,. . 3 0 �"R. . T13 1240 536 /227 748 11 1 6 2 10 2-1 3 11 2 E � � 1 ' a � � t � � � � �� 4 x, E — ,. ��s 4 t z y x 1 21 611 1 D2 8.23 2 04 6 SO 1 39 9 00 2 50 7 32 219 9 40 3 41 819 3 Ot 10 23 4 38 914 3 47 11 07 5 39 10 22 4 37 11 52 6 3B 11 39 5 33 64 98 12 113 66 94 -09 112 66 9D •05 111 64 $4 01 110 62 i9 08 109 57 75 17 104 49 73 26 " - � t� '' ; � f r + T � � � t _ . a a < a s ..� � „ c �S t.+ 12 35 7 28 12 59 6 34 t 1 fi 811 215 7 37 154 8 51 3 22 8 37 2 32 9 30 4 20 9 34 310 1011 512 10 28 3 50 10 53 6 02 11 21 4 32 11 37 � 6 51 109 38 75 35 109 25 61 41 111 12 90 50 112 03 99 56 114 16 108 60 116 26 115 63 116 33 120 � � ,� y JU ; N g$ E r f F � � � �� P 44 ` f' � � � � Jtf p � 2 3 4 5 fi 7 8 � � � � ` � a ' ` ' 9 10 i1 12 13 1A 15 � i214 519 12 23 710 109 6 09 1 11 8 29 2 D� 7 04 2 01 919 3 09 8 O6 2 52 10 09 417 916 3 46 10 59 5 29 iQ 3fi 413 11•48 16 17 18 19 2I1 21 22 64 114 36 122 64 111 34 124 62 105 -27 123 5B 97 -17 122 52 89 •03 121 44 IB,S 12 1'!9 23242526272$29 Far exact pmes and he�qhts see numer�al ratermtr.es L! G HT TYPE— M• BOLD TYPE-P. M . �PYnO� ��t 3 Evesy�sean Pars[ic Fubllsh+ag lTD flSH 6 WILpIIFE HOTLlNE (&i0) 477�6224 PACIHC DAYLIGHT TIME RED 7#DE HOTLINE (B00) 582 5832 ..-�... �,��w ...�� . � �m��.�� �«z��_ �,.�.,-� � .�� �. ����-m.��.� „- ��.-.�.,.,�„ +�.. � w�«».��� M a� � � � a�. ..��� �.� n... �. a .� �naw"`"�"�=�'.°.s JUNE 2D13 SEATTLE TIDES S�nday Monday Tuesday We�nesday Thursday Friday Saturday fi am kQDH 6 pm 6 am NOON 6 pm 6 am NOON 6 pm 6 am NOON 8 pm B am NQQk 6 pm B am NDQfd 6 pm 6 am NDON fi gm F i WIaY JIILY '� � 5 M T W[€� S S tu' W T f ti i � '� 1 2 3 4 1 2 3 4 5 6 �� c+ � 5 6 7 8 9 1 0 i 1 7 8 9 1 0 1 1 1 2 1 3 - � 12 13 14 15 16 17 i8 14 15 16 17 1$ 19 20 a �} i � 19 20 21 22 23 24 25 2j 22 23 24 25 26 27 $ 1$ 23 3a 5 56 11 57 5 t3 17 A6 �� 28 29 30 31 2$ 29 30 31 6 3A 12 09 5�8 24 79 40 116 33 7.8 28 f � _ ' � � � � � �,:s"'{' 1� V � Y � / � k � E � F .-.. s . p� � � � _ i, s d {d �_.......�... - `..,..�...e t2 36 7 39 i 4B 6 36 1 Z1 8 30 S 16 6.09 2 03 913 4'24 91a 2 42 � B1 fi 1 A 1015 318 10 25 6.02 11 OB 3 5d 1fl ST 6'38 11 5D 4.29 11 29 710 147 21 B.0 42 114 11 87 5.2 112 02 95 69 109 -05 10S 64 107 t0 10.8 67 1U4 -1.3 111 68 101 15 113 f � _ �. � € r � � � t t ; 4 ° ..,, b r -. _ 3- .._ f .'�1. } l t -a f � + _ .- ., i - 6 # �3 12 30 5 O6 12�[13 7.38 1 09 5 A4 12 87 &D5 1 47 fi 24 1 14 A 7B Z 27 7 08 i 62 9,U9 311 7 55 2'3t 9•44 3 58 8 49 3'12 1 �•24 4 48 9 53 3'iA 1 �'St &9 99 -15 114 $8 98 -1A 114 fiG 93 -12 116 64 89 07 115 GO 95 -07 116 54 90 0.8 f15 47 76 19 �15 i ° { _ Et �� � ' � � � �� 1 ,} ..... a. �. .. t _ - -_ - r r - � - - --- • _ • . ` i ! 5 40 1107 �'A6 1i 37 6 33 12 29 5� t 21 B 7 23 1 54 6•SD t �1 812 3'12 8 01 1 45 8 59 �'18 9'QB 231 9'A5 5.88 1018 319 10 32 5 57 11'O7 3$ 74 S2 114 27 75 44 114 1.5 81 55 114 01 �.O 64 115 -12 100 56 116 24 19.9 �.0 116 -32 11.6 69 l '� � � +,} � � ,+ a E _ ��, _ _ � � �� �S 7 , _ � '_ _+ � i� s 410 1119 8 4k 12 02 5 03 12 flB 7'26 12'ST 5 59 72 54 8 09 1'S2 E 57 1-A2 B•5� 2 50 S 00 2 31 9 9d 3 50 9 06 9.21 1017 4 53 10 26 4•14 11.01 116 37 �2.1 6fi 114 37 12.� 6� 11p -32 t25 65 104 -23 iZ6 48 97 t.D 125 4Q 89 06 123 32 B2 28 120 For exact tlmas and heiqMS sse num8�lcak ieferBnCes LI G HT IYPE—A M• BOLD TYPE -P.IIA . Copyright C� 2U13 fvergreen Paaffic PuDUSlxnq lT0 FISH b WILD�IFE HOTLINE (90Q) d71-b?24 PpC1FIC UAYLIGWT TpYIE RED TIpE HOTLINE (BOD� 582 5832 � �■r +r� � �r � � � �r r r �r � � r� � � � � � � � � ' � � � � � � r � � � � � � � _ _ � JU�Y 2013 SEATTLE TI DES Sunday Montlay Tuesday Wednesday Thursday Friday Saturday 8 am NOON 6 pm 6 am N�4N 8 pm 6 arn NOUN 6 pm 8 am NOdN 6 pm 6 am N40N 8 pm 6 am NOON 6 pm 6 am tdUON B pm � JUNE � _ e, � -- >� _ _ .,� j .� _' $�.� _ � .. � $ �a1 � yV 7 i � � �� �� � � ' � � � � � � � N � � �� . � � � 1 � �.. r } '� 1 �"".�'_"_ � �7' i _ tv""— .-.. _ �� 3: � t _ 2 3 4 5 $ 7 8 �" �, �'� - � , , � � � '� ' ` 9 10 if 12 13 14 15 `" >�°` , _ . . _�. � _._ � _� . � � _ _._ wa . _ __ __, � _ . _ ifi 17 1$ 19 20 21 22 � ` � �"`�"" � � "" °�` � �� �'°"`�" 23 24 25 2'6 27 28 29 6�56 1 41 6 24 12 32 � 7 51 3.13 7 46 1 18 8'39 4 21 9 05 2 04 9 21 5h2 iQ'GB 2 48 9 59 5.52 70 5B 3 30 10 3-0 8 2+i 1138 15 8] 53 1i2 07 B9 64 ifl8 01 97 6.9 105 -04 1US 71 102 -a9 108 7p 10Q -10 110 69 t �� - € =��- ��� �'� - ��.: r - .�. �,�'�, �.� �� � ,�.� j , # t } � � � �1 � .,,w � F'� � � °s e-. . .,.... _�. � / m .� }- S 4 � 1 F P E � W ' � $ 1 C ) « ,.... .. � ' _ .1 a.....�.._ ,.� � ..... L.�� _ _ � g w .. _ ( "k i s �� � � _ .... ..�....«..... .� .a.... .... ..... _.... ,,. .... �.� _ 410 1108 6 50 1213 4 49 i1 4Z 7'13 12 45 5 29 12,1b 7 �6 1 1 S 6 SQ 1 Z 51 B't12 153 6 53 1'27 E.SO 2 32 7 40 2 04 � 9 OT 314 B 33 2 4� �9'b3 99 -i2 172 67 9.8 -12 119 fi5 9fi -1� 11a 61 9$ -09 915 5fi 92 -04 117 50 $9 Q4 117 43 B5 �d 117 fI t .. . '., LL Y ^....,-M'°� . `•t.'.'/' �.�1' d. 4—'-F F� i ^'. kr—� f .� #R.-,-.,,,_ W .....y y��r._ -� _. . > �� �� f `��'4:� �"��� �,� � \�� # �� x ?� ...«�R��� ..._. ....����._..a,. � z ,. � — ; x �.„...>.�...._......� e. .... ...... .,,..�,1,� i � f d � ( .�. - .�,.« .,..,..,..w_ ___ „,_ , � t 4 00 9 33 3•24 18 08 4 50 10 42 1'11 10 47 5 44 t�'f!1 5 Oi 1130 6.4a 135 6'19 1218 7 3T 9'02 7'd0 1 12 8 32 4 OS 8�56 Z fl9 9 25 4 SA 10.Ofl 35 B2 2fi 116 26 Ba �O 115 17 80 5� 113 U6 84 85 1/2 -U4 92 71 112 -15 101 72 113 23 109 TQ € � € � � � � '., '+� � �t - -��� � -'� -s � � y „� � °� ' � � � ' � � ! t t � p , ' � � � ,r � � „. � 'v _ .� , _ a j � — , _ � , . _ 7 _ � . ,. .�. t i _ _ � � _ 3 �fi 1015 5 4Q 10 fi6 4 02 11 d3 6.20 �1'49 4 59 i l 5] 8'S8 12 39 5 55 12 37 7 36 1,29� 6 53 1 i3 8.1� 2'20 J 54 2 OB 8�51 312 8 5A � 2'88 990 114 -29 11.5 6.4 114 -81 i19 57 113 -28 1Z2 49 i10 -21 124 41 105 -11 124 33 99 0.3 123 27 92 19 120 � �`� - ' AUIiUST Q e � � `a� � �` ���` S iN T W T F S ' - s �,- -�,- �, � - 1 2 3 � � s�� � � d 5 6 7 8 914 � � � �_ � � � , _� � __# _� __ �� 1213 �a is is n 8 1fi 22 z9 4 OB 10 09 3.16 1811 5 f13 11 �4 4 45 V 10 56 fi 61 1 T7 5 59 �1') a6 7 01 2,52 7 33 18 � 9 20 21 22 23 24 21 B 1 3 5 11 6 1 7 $.3 5 1 11.0 1 3 E 5 fi 3 10 5 1 0 9 0 7,D 25 26 27 28 28 30 31 fore�acl limesznd heqhts seenumerkat �etermoes ����� NpE—A • BOLD TYR�—P.�I Capyrfght�2d13 Erargreen PaalflcPu�ligh[nq LTO FISN a WtRDLIFE NOri1NE (BOb� 477�4 PACIFIC DAYLf6HT TIME REO TroE HOTLIHE (9oua 562 5832 �- _ � - -_m� ° 4 .�� s _ _ � ,��. _ , .�, � � - ,�� � �� � ,�� �. � � _ � _ AUGUST 20�3 SEATTLE TIDES Sunday Monday Tuesday Wednesday Thursday Friday Saturday B am N6QN B pm fi am NflQN 8 pm 6 am NDOM fi pm B am NOON 6 pm 5 am NOON 6 pm 8 am NOON 6 pm 6 am NflflN 6 pm �,� JULY SEPTEMBER �- —+---- � "� � M T W� F S S M T W T F S ` { ` 1 2 3 4 5 6 1 2 3 4 5 6 7 �� =� � 4 � ' 7 8 9 10 11 12 13 8 9 i0 11 12 13 14 ° `' 14 1§ 16 17 18 19 20 i5 16 17 18 19 20 21 � 1 4 21 �8 � 21 22 23 24 25 26 27 22 23 24 25 26 27 28 12�40 7 57 3 58 8 57 1 35 8 47 A 45 4:57 2 28 9 31 5 21 1011 28 29 3Q 31 29 30 100 �6 97 7� 98 03 1U2 69 98 aa 1Qfi e 6 � ` "s t<1 ��r 6 .'' � / � --- -- - — ,� < _. . ..- 2 ��' ° � - +, �} i '°" _ _ � _ W _ f _ -* x � x . � t 316 10 09 5�9 f 1 15 4'00 1 Q 45 fi 11 11.43 4 41 71 20 6 3� 1211�5 21 11 54 B 52 12 41 8 Oi 12 2B 7 96 1 14 6 A4 1,04 7 AJ 151 7 31 141 B 13 97 -03 1�7 8� 97 -04 109 58 98 -D5 11U 53 98 03 712 9B 98 01 114 41 97 D7 195 3.3 95 15 ]15 r � � --�-- — - � � � �� E < i a d F { 3 "hseF'� a _ , _ , _ _ , , - : a 2 32 S 22 21B B �5 316 9 20 3 02 9'20 4 Ob 10�26 S 54 10 D1 5 02 1146 � 51 '!0 SB 8 OS 1•18 fi'11 1158 7 a7 P 4i 7 40 12 56 8 09 3 d6 8 56 26 B3 P.6 1!5 16 91 39 113 12 88 50 111 07 88 6.2 fOB UT 9B 69 1@B -D5 96 79 105 -10 103 fi.7 � ' �, -� �, � �� � ,, � , - - �- ,a � t _ k — . , - t � m � - � 2 04 9 O7 ��1 B.Bfi 3-07 9 59 5 B4 1E a5 4 O6 10 48 5 44 11:�1 5 02 11 3q 618 1216 5 57 T2:19 6 51 1 OQ 6 52 1.p8 7 ZO 145 7 48 1 4B 6.02 i0fi -15 1�9 59 108 il i14 6U 110 16 1T7 4.9 ittl -t1 119 31 1fl9 0.3 12.0 23 106 08 119 1$ 10.3 21 117 { j 3 � 8 t ( � T — �..� f 3 f F � �t i _ � _ g � — �a a _ 3 s r )-^_ _ e . a y �._ � _ .s. > b 2 3d 9 4B 2,94 8.�0 3 7 6 9 49 3st 9.21 4 OB 11 Q2 � 2A 10 07 5 91 12 33 5 41 11 p1 6 02 2 a5 726 12 05 7 O6 312 8��5 t 11 B 05 3 5B 9 37 12 98 35 172 11 94 4.8 f07 f 1 B1 59 101 1$ 90 G1 gfi 13 Y3 69 4Q 13 9T 66 89 12 100 61 For exae! tlmes md haphls see �umerkal rehrances LI G HT 1YPE— IU�. � BOLD TYP�—P M . �AYnO� � 2�13 Ever�reen PacJt� PuWEsltmp !TD F151i d WI�OUFF HOTI.IHE {B00} 477 622� PACIFIC OAYLIGHT TIME HE� TIOE HOTLINE ;800} 562 563t r� � � � r �w r i � r � � a � � � � � � � � � � � � r� � � � � r +� r r� r � � � 0 SEPTEMBER 2013 SEATTLE T1DES Sunday M�nday Tuesday 1Nednesday Thursday Friday Saturday 6 am NOON 6 pm fi am NOON 6 pm 6 am NOON fi pm fi am NQON $ pm 6 am NOON 6 pm fi am NOON 6 pm 6 am NOON 6 pm � � "_ r,C.._._. __..__. ,r,,, _ _ _ � �'�.,�„ y .= ,:�_ , �`�—� __d,h'..� �p� « �� b �� FF .� � � 4 � j L 's i � �. -� �� � — � N. Fi - � � � 1 � } > d .- a ! ••. •• .•••• ^• a _ _ � 213 B56 130 1EI.13 3�6 939 i51 iG42 352 1018 514 1i07 43A 1059 535 11.34 514 lfz9 558 720A 556 f2QA 829 i237 &39 12'41 652 90 10 103 56 92 �8 10� 5U 95 D7 10fi 4A 9B OB 108 37 1�0 1i 110 28 1�2 t6 111 20 1p3 23 f1,2 �.� , i "`` _ _ � " ' a ,.�.,` ° ,� , _ _�� � t � � � � _ � -- � .. _ » ; J d �4 # � <� £� Z� 4 � � r V . 1 14 l 25 �7 2Q 7 23 1 55 81 S 2 02 T.57 2 4fl 9 i 2 219 8�36 3 3U � a 17 3 44 �9 28 4 27 11 33 4 55 10 22 5 31 12 5B fi 24 1136 12 104 31 1f2 05 td3 A1 1f1 01 101 51 10a -01 98 60 104 -a2 87 67 100 -Q1 98 68 98 B ' yl ....� f ; � ly �' � f R _ ' � � ' T ; �� � ` a � �� � R � � t � � '� 1 � `� '�� 4 -� F-..+ ♦ � R �� �- � C � aa � � f ^ � r ,� — c � __ ; g t 6 4a 214 7•51 -fl 1 10.2 B 3 �) r� t . # � . » . 12.55 7 47 �3•10 � 57 2 i 1 8 48 �8 52 9•IA 3� 8 9�}2 �.PB yB 32 417 10 31 5�00 �19'12 512 11 17 5 3z 1157 � 6 D3 12 02 6 04 12 30 & 53 f2 46 �8 37 96 -01 106 54 98 -01 119 4.2 lU2 fll 19S 37 tQ5 05 71B 20 108 12 1i6 11 109 21 116 04 109 3T 113 E � _ � 1. � � � _ } _ . � � � � ` ' � � �� � -t 3 � } < � — } .�... 1 �9 7 43 13O 7 i2 148 8 94 2 97 7�9 2.39 9 2B S 03 a 97 315 1 U 2$ 4.1 � 919 4 05 1138 5 33 16 i7 5 02 12.5A 711 1120 fl1 1Q8 �1 10! 01 iQ6 fi0 104 �1 103 5A 43 05 1�0 84 91 10 97 67 85 15 91 6.5 81 , - � AUGUST UCTOBER 5 iarl i t� �' � S S M" 4N f S �� ' � � 6 06 1 59 B'20 18 98 60 °�, � , r , '�— m" _' 1 2 3 i 2 3 4 5 �� t1 � � � 4 5 fi 7 8 9 1Q 6 7 8 9 1011 12 + " ° °'`"� � 11 12 13 14 15f617 13i4151$1718f9 12 44 71 i 21i 9 fl5 1 5d 81 Q 319 9�T 18 19 20 2i 22 23 24 2� 21 22 23 24 25 26 � i 2 19 27 b 0 2 0 1� � 6 3 8 3 2 � 10.2 4 5 25 26 27 28 29 30 31 27 28 29 30 31 rbr e�cr um�s and haDMs sce nsimer�at rete�ences LIGHT TYPE—A.M • 80i.D TYPE --P M Copynpht aCa 2013 Evergreen P�c�bc Puhilstiing LTO fISN � WILpLIFE H�1LitJE (80U� 477$Z2� ppCJFIC QAYLIGHT T11�11E REO TI�E Nl7TLINE {Bpp� 562-5fi32 � _� _�,r� ..�Fx_����.��� �+ <� ������ - ��� ������,��� �, _ �.�-___--__�,a�,.�x �r � ' THIS PAGE LEFT INTENTIONALLY BLANK � r C_ 1 � r, i l ��� � '�J ' � � ' � �� J ' , LJ ' � �_ J ' � I��� ,�i I AGREEMENT FOR LIONS PARK PARKING � � , ` � � � 1 1 � , � 1 �� LOT USE � � L� THIS PAGE LEFT INTENTIONALLY BLANK � I� � � L�J � ' � � , � ' � � ' C J L� � � � LICENSE AGREEMENT This LICENSE AGREEMENT is entered into between the City of Bremerton, a Washington ' municipal corporat�on ("City) and ' � � � ' � � ' ' ' � � � ("Licensee") Whereas, Licensee has contracted `nnth the Crty of Bremerton to perform the pro�ect Eas�s�de Beach Marn Replacement" Whereas, in the Eastsrde Beach Main Replacement contract, the parties agree that the Licensee has an option to use a portion of the Lions Park staging area pursuant to the terms of this license agreement for the purpose of welding HDPE and accessing the beach via a barge Whereas, Licensee agrees to use the area in accordance with the terms set forth in this agreement and in the contract Eastsrde Beach Main Replacement Therefore, the City agrees, upon the following condit�ons, to grant Licensee a license to utilize a portion of Lions Park upon the following conditions 1 License and Condit�ons City agrees to provide Licensee this non-exclusive license to utilize a portion of the City's Lions Park west parking lot ("Property") for the use and terms described as follows A Use This license is granted to Licensee for the purpose of welding HDPE pipe and using the boat ramp to stage a barge or boat for beach access The Contractor agrees to provide traffic control as required or as directed by the Owner B Time Period The Licensee may close and occupy the designated area for the durahon of the pro�ect for the described use Only a single closure is permitted C Limits of work area The limits of the area reserved for the use are shown in the attached Exhibit A The Contractor may not exceed these limits unless agreed upon in writing with the Owner Contractor personnel vehicles shall be parked �nnthin the designated staging area Where the Contractor exceeds the designated limits, $300 per day will be deducted from the Contractor's next pay est�mate License Agreement ' Use of L►ons F�eld Parkmg Lot Page 1 of 3 March 2013 � L__J D Payment In considerahon for the grant�ng of this license, Licensee shall pay the City a sum of $1,000 per week, payable to the City of Bremerton A week of use shall begin on a Monday and end on a Sunday Payments shall not be prorated if the area is occupied for a partial week If the City does not receive payment within 15 days of completion of use, the amount shall be deducted from the next payment , � � E This license is given only for the above stated purpose Any extension or ' modificat�on of the scope of use shall only be m wrihng F Licensee shall reasonably carry out the uses allowed v�nthin the Property so as not to interfere with the City's use and operat�on of the remaining area of the Property for public parking and use Provide signage at the entrance to ensure public access to parking areas and provide flaggers when mobilizing and demobilizing equipment and materials G Licensee shall maintain the Properry in good condihon, shall clean any debris and litter, and shall be responsible for any property or environmental damage resulting from its use of the property Where damage or cleanup is not remedied by the Licensee, resulting in repair, maintenance or cleanup activities by City staff, the cost shall be deducted from the next payment IN WITNESS WHEREOF, this Permit Agreement is executed and shall become effective as of the last date signed below CITY OF BREMERTON � �ts Date Approved as to form Bremerton City Attorney Ltcense Agreement Use of Lions Field Park�ng Lot LICENSEE By �ts Date Attest C�ty Clerk Page 2 of 3 March 2013 ' �7 M M O N M ,� �0 � O � � Qi F .. 0A ., x � w � 0 J �1 C t � a � 0� � h � O J O N � fi � � d � Q' N � d U � ' � � � i � � � � � � � � � � � � � � , ' THIS PAGE LEFT INTENTIONALLY BLANK � C J � ' C� � ' � �� , � ' ' � ' , ' ' ' � � 1 0 � � � � � 1 ' ' � �� � 1 APPENDIX F CONTRACT PLANS , LJ � THIS PAGE LEFT INTENTIONALLY BLANK I ��� ' ' LJ I� ' � '� , ' � 1 ' ' �I � i� ' 1 � 1 , ' 1 ' ' ' ' ' , � ' ' ' ' � 1 _ � i � ;r ; � L � ..- � . _ �- . � _ _ , - � ; �' 1 ' ' 1. � � ' �. , ;. �: � , _ _ ' C iTY PROJ ECT #: 5325 REVIEWE�� N LEVER, P E ANAGING ENGINEER 13 REViSIONS a +• r NO DESCRIPTON DATE BY TYVO INGHES AT FULL SCALE IF NOT SCALE ACCOR�INGLV SCALE HORIZ N/A VERT N/A i SHT DWG. SHEET TITLE 1 2 4 5 6 8 9 10 11 12 13 14 15 G1 G2 G3 C1 C2 C3 C4 C5 C6 C7 D1 D2 D3 D4 D5 APPRO D BY KNUCKEY, P E ClTY ENGINEER FlELD BOOK e+''� �� ��������� �e pEPARTMB1iC't' OF PUBLIC tllfOi�KS 8 4lTIL9'PIES �PIGIPl�BRING DIVISION ORAWING NO �RAWN BY 7H OES�GN 8Y WJD CMECKED BY� NL DATE 3/13 WASH p E y 34787 DATE 3/13 WASH P E B J0749 OATE COVER SHEET LEGEND, NOTES AND ABBREVIATIONS SF6EET IMDEX AND SURVEY CONTROL WEST END STAGING AREA AND BEACH ACCESS ROAD PLAN AND PROFILE STATION 9+00 TO STATION 6+00 PLAN AND PROFILE STATION 6+00 TO STATIOIV 11+00 PLAN AND PROFILE STI4TION 11+00 TO STATIOM 16+00 PLAN AND PROFILE STATION 16+00 TO STATION 21+00 PLAPI AND PROFILE STATIOiV 21+00 TO STATION 26+00 PLAN AiVD PROFILE STATION 26+00 TO STATION 30+82 STANDARD DETAILS EAST CONNECTION AND BYPASS AT STATION 30+82 WEST CONPlECTiON AT STATION 1+00 SIDE SEWER CONNECTIORIS WEST END ACCESS ROAD DETAILS �: � �:; �a��.�'�� ��C� ��� ���C����� V�tl�� 5���� sr+�er � � 1 � 15 ���� ������� �� �.�.5. ' �� i i � ' �I � u ' , ' ' 1 ' , , ' I ! L�' 1 1 ' , ABBREVIATIONS LEGEND GENERAL NOTES UTILITY VALVES AND FITTINGS SURVEY SURFACE FEATURES AC ASBESTOS-CEMENT EXI ING Jj��J 1 ELEVATIONS ARE CIN OF BREMERTON DATUM, WHICH IS NATIONAL ADJUSTED VERTICAL DATUM 1988 (NAVD88) ALUM ALUMINUM PIUS 112 35 FEET COORDINqTES ARE TO HORI20NTAL NATIDNAL ADJUSTED DATUM 1B° �ib� (NAD° APPROX APPROXIMATELY _ ____ PROPERTY UNE � ROW ARV AIR RELEASE VALVE --��— FLANGED CONNECTION 2 D(ISTING TOPOORAPHIC FEATURES SHOWN ARE BASED ON A FIEID SURVEY CONOUCTED BY AES CONSULTANTS ASPH ASPHALT MAX MAXIMUM �--- MECNANICAL CONNECTION (MJ) - " GOVERNMENT MEANDER LINE pURINGAUGUST2012 AVE AVENUE MH MANHOLE _ 13v _ MAJOR CONTOUR 3 HORIZONTAL ALIGNMENT IS BASED ON THE CONSTRUCTION BASE LINE5 SHOWN ON THE DRAWINGS GENERALLY AVWVA AMERICAN WATER YVORKS ASSO( MHHW MEAN HIGHER HIGH WATER ��� GATE VALVE (FL� THE CONSTRUCTION BASE LINES ARE COINCIDENT VNTH THE CENTERLINE OF THE PIPE MIN MINIMUM ___ _______ __ MINOR CONTOUR BLOG BUILDING MISC MlSCELLANEOUS 4 HORIZONTAL DIMENSIONS AND STATION OFFSETS ON PLAN AND PROFIIE SHEETS TO PIPELINES MANHOLES AND BM BENCH MARK MJ MECHANICAL JOINT —i} f— BUTTERfLY VALVE (f'L} t y TOE Of BANK OTHER FACILITIES ARE TO THE CENTERLINES OF THOSE FACILITIES UNLESS SPECiFICALLY NOTED OTHERVNSE BOC BACK OF CURB MLLW MEAN LOWER LOW WATER —a-- pLUG VALVE — E� � EDGE OF PAVEMENT �NVERT ELEVATIONS IN MANHOLES AND OTHER STRUCTURES IDENTIFIED IN THE PLANS REFERS TO THE BOT BOTTOM -�—t�,r— BACK OF CURB ELEVATIONSATTHEINVERTOFTHEPIPE BOW BACK OF WALK N NORTH �q L 5 THE CONTRACTOR SHALL MPJNTAIN ALL SURVEY MONUMENTATION WITHIN PROJECT LIMITS ALL DAMAGED NC NATIONAL COARSE �' `If CHECK 4ALVE (f'L) -eo�r BACK aF WALK MONUMENTS SHALL BE REPLACED AS RE�UIRED BY THE CITY UNDER WAC 332-720 C8G CURB 8 GUTTER N/C NORMALLY CLOSED �`��' 5URVEY CONTROL POINT C8 CATCH BASIN NF NATIONAL FlNE N� f�ANGED ADAPTOR (FL X MJ) 6 MANHOLES AND STRUCTURES ARE SHOWN ON 7HE PLANS SYMBOLICALLY CONSTRUCT MANHOLES AND CCP CONCRETE CYLINDER PIPE NG NATURAL GAS _ ��G� `� MONUMENT STRUCTURES AS SHOWN ON THE DETAILED DRAWINGS AND AS SPECIFIED CQF CONTROLLED DENSITY FILL NO NUMBER =— SOL1D SLEEVE (MJ) 7 RIGHT-OF-WAY AND PROPERTY LINES ARE SHOWN APPROXIMATE ONLY CF CUBICFEET N/A NOTAPPLICABLE LXXXX7) ROCK WALL CI CAST IRON NTS NOT TO SCALE � PIPE CAP (MJ� ,� � CONCRETE WALL 8 7HE CONTRACTOR IS SOLELY AND COMPLETELY RESPONSIBLE FOR FURNISHING INSTALLING ANO MAINTAINING WARNING SIGNS AND DEV3CES TO SAFEGUARD THE GENERAL PUBLIC DURING WORKING AND NON-WORKING CL CENTERLINE CLASS —x—x— fENCE HOURS CO CIEAN OUT OC ON CENTER —o-- REDUCER (FL) COL COLUMN OD OUTSIDE DIAMETER �. OR _� SIGN B GRADE SHOWN IN THE PRaFILE IS ALONG THE CEN7ERLINE OF THE PIPE AND IS FOR BOTH �XIS7iNG AND FINAL CONC CONCRETE OL OVERLAY GRADE THERE IS NO CHANGE 13V GRADE CONN CONNECTION CONST CONSTRUCTION PCC PORTLAN� CEMENT CONCRETE CSTC CRUSHED SURFACE TOP COARSE PE Pu+�N END CY CUBIC YARDS PL PROPERTY LINE UNDERGROUND UTILITY PIPING CONSTRUCTION NOTES POW POWER D STORM DRAIN PP POWER POLE YS M80L SERVICE i MAINTAIN CONVEYANCE OF STORM ORAINAGE, SEWAGE FLOWS AND WATER SERVICE DURING THE DEG DEGREE PV7 PAVEMENT CONSTRUCTION WHEN AN OUTAGE OR BYPASS IS RE�UIRED iN ORDER TO CUT THE EXISTING PIPE AND MAKE A DEPT DEPAR7MENT PVC POLYVINYL CHLORIDE c STORM DRAIN CONNECTION THE CONTRAC70R SHALL NOTIFY THE CITY 72 HOURS AHEAD OF TIME THE DURATION OF THE DI DUCTILE IRON PW POTABLE WATER __ �,� SAN SEWER FORCE MAIN NOTE QUTAGE SHALL BE LIMITED AND AGREED UPON 1MTH THE OWNER PRIOR TO THE ACTUAL WORK DIA owMe�R �' NOT ALL ITEMS SHOWN 2 NEARLY ALL WORK OCCURS BELOW THE ORDINARY HIGH WATER MARK (OHWM) PLAN AND EXPECT TO DEWA7ER DP DEEP R RADIUS ,> SEWER DWG DRAWING RD ROAD ROOF ORAIN ON THIS SHEET ARE THE TRENCH DUE TO TIDAL INFLUENCE SUPPLY ANp MAINTAIN ALL EQUIPMENT FOR PUMPING WATER FROM THE REINF RElNFORCED OR REINFORCING W WATER TRENCH TO OBTAIN A DRY, STABLE BOTTOM FOR INSTALLING THE NEW PIPE ALL COSTS FOR DEWATERING THE E EAST REQD REQUIRED _ S TELEPHONE INCLUDED IN THE PLANS TRENCH SHALL BE CONSIDERED INCIDENTAL TO OTHER BID ITEMS REFERENCE SECTiON 7-08 3(1)D FOR EA EACH RJ RESTRAINEQ JOINT ADDITIONAL INFORMATION ON CONTROL OF WATER EF ELECTRO-FUSION RT RIGHT - .- - GAS 3 SURVEY AND FIELD STAKE ALI. ALIGNMENTS PRIOR TO EXCAVATION SUBMIT RECORD DRAIMNGS BASED ON EL ELEVATION ROW RIGHT OF WAY ._ .'._._�, POWER FIELD SURVEY UPON COMPLETION OF PROJECT ELEV ELEVATION ELL ELBOW S SOUTH SLOPE SEWER 4 TNE LOCATION AND DEPTH OF EXISTING SEWER PIPING ANO SIDE SEWER CONNECTIONS ARE NOT KNOWN VNTH EM80 EMBEOMENT SD STORM ORAIN CERTAINTY POTHOLE TO VERIFY PRIOR TO WORK AT THAT LOGATION IN ACCORDANCE WITH SECTION 7 08 3(5) EP EDGE OF PAVEMENT SQMH STORM DRAIN MANHOLE DETAIL & SEC REFERENCE SANITARY 8� STORM 5 UTILITY CROSSINGS ARE GENERA�LY SHOWN ON THE PLAN AND PROFILE DRAWINGS WHEN KNOWN IF DEPTH IS ETP EASTSIDE TREATMENT PLANT SL SEWER LATERAL NOT SHOWN, THE OWNER MAY DIRECT THE CONTRACTOR TO POTHOLE THE UTILITY TO CONFIRM THE ELEVATION EX EXISTING SQ SQUARE �—" PRIOR TO CONSTRUCTION SR SURFACE RESTORATION OETAIL NUMBER �`�L�G ITEM FD FLOOR DRAIN SS SANRARY SEWER Z 6 VERIFY LOCATIONS E�EVATIONS LENGTHS DIAMETERS MATERIAIS STRUCTURE TYPES AND QTHER 5 ( UTILITY MANHOIE PARAMETERS OF EXISTING FACILITIE8 TO WHICH NEW STRUCTURES/PIPING WILL CONNECT BEFORE ORDERING FIN FINISHED SSFM SANITARY SEWER FORCE MAIN DRAWiNG NUMBER WHERE DETAIL �" FH FIRE HYDRANT SSMH SANITARY SENfER MANHOLE � MATERIALS FL FIANGE SST STAINLESS STEEL IS LOCATED �uj STORM DRAIN MANHOLE FLR FLOOR ST STREET �- 7 SPECIAL CONSTRUCTION GONSTRAINTS SEpUENCES AND COORDINATION WITH THE OWNER ARE DISCUSSED IN SECTION LETTER `,S) SANITARY SEWER MANHOLE SPECIALPROVISIONSECTIONSI-080(6)AND7-OB,AND7-17 FM FORCE MAIN STA STATION A 8 OVERHEAD UTILITY CA6LE5 (E G POWER CABLE ETC) ARE GENERALLY NOT SHOWN DETERMINE THE EXTENT OF FT FEET FOOT STD STANDARD CATCH BASIN FTG FOOTING FITTING SY SQUARE YARDS ORAWING NUMBER WHERE SECTION � HAZARDS OR IMPACTS ON CONSTRUCTION ACTIVITIES DURING THE BIDDING PROCESS AND PRIOR TO IS LOCATED r � CULVERT MOBILIZRTION FOLLOW LAWFUL AND SAFE PROCEDURES DURINO CONSTRUCTION FOR WORIONG AROUND G GAS TELE TELEPHONE OVERHEAD POWER COORDINATE 1MTH THE RESPECTIVE FRANCHISE UTILITY (I E GAS CABLE, POWER GM GAS MAIN TEMP TEMPORARY - 3 SANITARY SEWER TELEPHONE) FOR LOCATING PIPING OR CONDUIT GR GRADE THK THICK 8 NOT AlL BUILDINGS ARE SHOWN ON THE PLAN SHEETS THE CONTRACTOR IS RESPONSIBLE FOR WALKING TNE GS GAS SERVICE TOB TOE OF BANK i> STORM DRAIN PROJECT AREA TO CONFIRM POTENTIAL OBSTRUCTIONS GV GATE VALVE TOS TOP OF SLOPE — M SEWER FORCE MAIN 10 WI7HOUT EXCEPTION ALL PIPE JOINTS SHALL BE RESTRAINED REFERENCE SECTION 7 17 TYP TYPICAL � HOG HOT DIP GALVANIZE UG UNDERGROUND a HDPE HIGH DENSITY POLYETHYIENE UP UTfLITY POLE HRS HOURS � HMA HOT MIX ASPHALT VERT VERTICAL Ho� HORIZONTAL VAR VARlOUS WATER GAS, TELEPHONE 8 POWER HT HEIGHT W WEST WATER EXI571NG ,�T� S N IT I� INSIDE DIAMETER WB WESTBOUND � IE INVERTELEVATION WM WATERMAIN WATERMETER �'j or �( WATER METER BOX ;� � WS WA7ER SERVICE ,� t.. TELEPHONE VAULT/MANHOLE L LENGTH 1NT WE�GHT ��} FIRE HYDRANT � JUNCTiON BOX LF LINEAL FEET � GATE VALVE �c?- UTILITY POLE — �It' — BUTTERfIY VALVE F— UTILITY POLE ANCHOR (�; VALVE POST MARKER �.� ..�_�, TRAFFIC SIGNAL w - WATER MAIN r TEIEPHONE LINE (BURIED) — R�� RESERVOIR SENSING LINE „ GAS LINE (BURIED) 'M TELEMETRY ° POWER LINE (BURIEO) ; - TM - TELEMETRY v� ay �9 �" �`' � REVISIONS a � Z Fi�o sooK CITY OF BREMERTON t �' = No OESCRPTION QATf er DEPARTMENT OF PUBI.IC WORKS S IJTILITIES EASTSIDE BEACH MAIN REPLACEMENT Gz � TWO INCHES AT FULL SCALE �R� � �,a IFNOT6CALEACCORDINGLY ENGINEEItIN� DIVISION LE6END, NOTES, AND ABBREVIATIONS � 2 ` � ORAWiNG NO � � �j�++� f s� �� SCALE RRAWN BY TH DESIGN 8Y WJD CHECKED BY NL 15 'J' HORIZ N/A VERT N/A DATE J//3 WASH P E {f 3479) DATE 3/13 WASH P E (/ 30749 OATE 3/i3 � ' , ' ' , ' ' ' 1 ' ' ' ' ' ' � ' 1 ' PIPE CENTERLINE CONTROL POINTS AND ELEVATIONS STATION NORTHING EASIING SURFACE PIPE IE �+40 1194867 80 217588 02 119 90 113 23 1+75 1194940 24 217568 59 119 90 112 93 2+50 1195013 95 217555 46 119 20 112 63 3+25 1195088 50 217547 18 119 00 112 33 4+25 1195188 01 217537 36 118 40 111 QS 4+75 1195237 86 217537 36 117 70 110 46 5+25 1195287 70 217530 65 116 30 109 40 5+75 1185336 35 217520 36 116 20 108 32 6+25 1195378 10 217500 06 113 30 107 24 6+75 1195417 60 217469 53 114 40 106 77 7+25 1195458 20 217443 71 114 80 106 91 7+75 1195507 14 217428 68 115 40 107 06 g+25 1195555 92 217417 67 119 90 107 20 g+75 1195605 23 217409 41 116 30 107 34 g+50 1195679 02 217395 92 115 00 107 55 10+50 1195777 80 217380 36 115 10 107 84 11+50 1195877 23 217370 39 114 90 108 12 12+50 1195977 19 217371 29 115 80 108 41 13+25 1196052 02 217376 00 114 90 108 62 14+00 1196126 69 217377 35 114 6Q 108 84 14+75 1196200 53 217368 46 115 10 109 39 15+25 1196250 78 217362 76 116 90 11Q 23 15+75 i196300 15 217354 87 120 00 111 07 16+25 1196346 42 217238 08 120 50 111 92 18+25 1196529 61 217257 84 118 70 112 88 19+00 1196600 60 217233 73 121 50 114 33 19+75 1196674 21 217220 12 118 30 112 05 20+50 1196746 57 217200 41 116 20 110 06 21+25 1196818 54 217179 37 114 90 109 34 22+00 1196889 38 217154 75 114 80 109 06 23+00 1196983 22 217120 19 115 10 108 67 24+00 1196p76 35 217083 94 114 80 108 29 25+00 1197166 13 217039 91 114 70 107 92 26+00 1197255 16 216994 68 114 40 107 62 27+00 1197341 59 216944 58 11510 10716 27+50 1197384 13 216918 26 115 20 106 97 2g+00 1197449 72 216882 09 115 20 106 77 29+00 1197514 77 216844 76 115 20 108 17 2g+75 1197579 38 216806 80 115 90 109 05 30+50 1197639 87 216762 46 115 90 109 56 30+82 1197665 00 216743 55 116 20 109 80 � REVISIONS NO DESCRIPTION EX[Sl1NG SURVEY CONTROL POINTS NUMBER NORTHING EASTiNG 6 1194833 49 217579 41 7 1195853 88 217276 60 8 1195587 24 217278 08 9 1195332 75 217628 77 10 1195280 66 217417 69 11 1196274 49 217338 72 12 1194585 77 217556 Q8 13 1194411 52 217598 59 14 1194047 14 217721 27 15 1197219 30 216957 76 16 1193701 32 217920 24 SURVEY NOTES 1 THE CONTRACTOR SHALL MAfNTAIN ALL MONUMENTATION WITHIN THE PROJECT LIMITS MONUMENTS THAT MAY BE DESTROYED BY CONSTRUCTION SHALL BE REFERENCED AND IF DESTROYED SHALL BE RESET PURSUANT TO RCW SECTION 58 09 13 AND 332 130 030 2 MONUMENT LOCATIONS SHOWN ON THE PLANS ARE APPROXIMATE THE PLANS MAY NOT INCLUDE ALL MONUMENTS FIELD LOCATION OF MONUMENTS AND REFERENCE5 ARE THE RESPONSIBILITY OF THE CONTRACTOR THE CITY WILL PROVIDE RECORDS OF SURVEY TO THE CONTRACTOR AFTER CONTRACT AWAfiD 3 REPLACEMENT MONUMENTS SHALL BE BRASS CAP IN CASE PROVIDE SUBMITTAL OF PROPOSED PRIOR TO INSTALLATION 4 AN ELECTRONIC COPY OF THE AUTOCAD DRAWtNG FOR THE PLAN AND SURVEY FROM AES CONSULTANTS (JULY 2012) WILL BE FURNiSHED TO THE CONTRACTOR UPON REQUEST TO ASSIST IN LAYING OUT PIPE ALIGNMENT HORIZONTAL GONTROL WASHINGTON STATE PLANE, NORTH NAD 83 (03) PT #2 SET �" REBAR WITH RED I D CAP IMPRINTED ' CONTROL 20795" IN LIONS PARK +/- � g0 WEST OF EASTSIDE TREATMENT PLANT, 19 5' SE OF SE CORNER OF CONCRETE PAD FOR BENCH, 1 0' NORTH OF 4' pIAMETER BOULDER N 217825 2640, E 1194530 5400, ELEV = 125 22 (COB DATUM) PT#9 SET�" REBAR WITH RED f D CAP IMPRINTED "CONTROL 20795" IN LENT PARK, 34' NORTH OF STAIRS 70 BEACH, 23' WEST OF SEWER MH, 4 5' WEST OF CONCRETE SIDEWALK N 217628 7744, E 1195332 7541, ELEV = 130 36 (COB DATUM) o , 2 OA'IE BY TWO INCHES AT FULL SCALE IF NOT SCALE ACCOR�INGLY SCALE HORIZ N�A VERT N/A FlELD BOOK NO i � DRAVYN BY 7H , � ,� ��� � Y�� � � `� J��� �„��� � �; ��"�,� �'� , �'.wi' % � ���` ><f' `�,� � �„ � � � �������'� � �h � •� � / �^�� � x �,� , s� '�`i,� � ,.�. � � %" , i y ��� � � :a.�..yvd�G .� i��� � � ,�, - � � '�"',,� F ,,, � , � ' � A c / ' � �s � � . ��.� %�� ` / / / .. � � .ry k „ '� ' ;;��,:� i �����j , �..,����`r` ; �,�, � �.� ` (` 's �� �� �0: "�. * ,; . � �� ��.+r,� +� ' � 3 T � ���//''� �� � rv AS i� J� � ^ F Q� �'%��.s`� G ���''��:`� � a � �. �,� � y .. ��r��° ,n;r���'� <�;�,. , - :.s 'rs ��n� ��� �� h �� � �� � l , ,C 4 f � '%` � * � �' ` �a '� A ' � � � • ' S '1. , ;� � i � � �; � f � � � ��, r a , L � 4 �. � � ��t! ,�. �K � �!��F �-� � � : ' �''-'�' � Y .Y �'� ����y ,�,��., a �� ;- Nx i 3 3 �^£� � � i ���r �i v � r L({D � ,�, `, �`;' �` : ;�e�r�r� � , „. � , � ; a� ,t ,., �,� % f, ,� ,..�ua'�`�.��.1 �,�,;;�, r� �.�. � , r.� i c r '.9 .,p�, � s' * ra� `%ry;vr l ��� � :� "�, 1 „ �, � , ���°,;, ( '�'ik Y� °% !"'� 1 ��j� y// � � r ,�'�si'�,6� /� . �� ��� } r ' 4 k �'° y � w �>� � ; �, � j� � �, ���, �-. � ;. '�/` � � '��" ��.5 ' � �'� �4��..../�'� b� „���, € < � '�ya �k : M,. � �rv . j % � f f y� i C. � .f � � rt; 1�� � � �� p � � �;� �;, ,'� ,� ` , � yr f � „ �� ` m�,�� �� � �, � ;�� �� ��; � � � �� � ( h 2 S i yiy r�.yyx � r�,� r �� � i u,�, ! yy.. ' ° `� ..1� �'........�:� �� � � � a,er,�E i �9i " > ��� f i^� 'j � ' � 5 �R T ' �x� �� � � � � � ��„��„�, y �� � ;�„���, �, ��� �yk"` �� �� % � %� ��� �' ;�:�,�;�;� ,;,,,, � F ���?��� < y ��� - � �«�� � � ��^„-,� �'�� ; � ' �� p � r �.� �� � � �� � ' S {j� 3 ` � , � �,��� ? ��``�;; �' �� �"� ,' �! x " u' �"�s-'�� „—, ; �" � ::.. w ,.� ^�✓, f , .� �`�l���`�-Q s� ��` f '��` 3 �.° '` � ���°4� ,�� }��� � N j � � �r � '�`%; z � �l /�,, 7Y��'� ,'l'��, " wy �;.� � �> � ' , ' ` < <y. y � S/ <q' i'$ � y � % f li I �;,r ��� l�I � f��'Y� "xF ; €�� ����� / � i `YS �`���,� �� ����.U,�� f E,� , v h f�e��,`��;"��� � ��i y � �*� �a�'i�`✓.'(,y� %'��`�%. � %�!��u?�� � ����� ,��:�� � ' �..»;..N . ,.. . .,�.. �, � .s � F � �r � � � <jvjF % /,.: ` � j 2 � L.. z� �7s. � x �, �, z 3 � ( e £us � ;'a'' �'�. r % � i f < �u.^' w+,tq M.wa.- � �. Y � � L £ zx?'`X�"�� � � u„�, , wk.� ,, ' �� �> > �� ^� � � L n � � � � µ ? .r g d ...J+ - I 0� � ^ '` � , x a;� �` " � <:�hcfc� 5 . �£w�,,;��.�`�G�� J >� : ��` 1 � `�i," *r ` �y t� , � �"� a ;";"i � 3 �� ��� � , �� �' J , :, � �� �� � � ~��� �,+�'��#�! a� !^ '� ., `�. ,� �,, ^.�'.-� �� � ' ���i"<R� ss � s F i"' s r� �'�''� �`'; w, ��`� t� �� J�, �j�, <��N�,�� , F,,� ��.,, �°°�;,� �, �� "��� �' n . , . � , ,r�„ ��i,� > / f`� j � ,s �� 5 ��„ � i R „ , � � zi i � �"'�"d ,� � �` x �.,,� �: " �V+.�ft�5y � ��? r Y � % � �k , �/%Y/ ^ �� .a �� . " % �'� �;; ��,�n' , ;��;.Y 'i, �- ;'�$`f ���� � � <� ���:t a � #h �,'�; �� � ��� �� ; � � ����"�� "���� � �'` � � o� % � , � ; � t��� � � � r „> � i'�� . � #' ; �M .. � � � fk ./��/n a. 1 �'�if a�i .r�`.�s,. . �:. , ..:w�/r."'F, ,. ''°:.dP'r ��`� � f�,. ,%:� PLAN AND PROFILE SHEET INDEX i';�ff,.r . 'r�r t�r f%% i��ii .: %i� f.i �^ � ^ �h � t .,,,/ � f � � ��� � i i / / i� . s �T. , �� ��f ' 7� x v/�j� �,���;'" ii: � i :� i f � f•.� �� y,y 'i"�"` : i F' ` � 6: / r ;� r � � j .. Ti�� ',ci r � %f 'j��� � r � ��'''i'� � �i��., �` y " � � ;- � , '„ � � ��=�AST '� �'����;�, � � ' �.�� , �,. f � .t �,,. �" / ,, � . " r � /.' ' � ,, „ i . � 3 /� �%"//., 3�; , # ``�,;" �9 ii�� .,�.`�.. •' . � � �.,: `�i ,F., f . � «, % , , / s { � / � i ��/ � / f : ii r i � �� �)1 � i % f �.,� � ��/ lf 1 � i� l/r /r f fy� � !� � r' 1;�4�tC�,�'I�IR�;i; ' , ,,,,, % � • ; ;:� "'� ��� ��� � �; ; � � �� �/ //� i i /f�� ',�,� f /, ' � �o'f�'�3� �•�� Ff . . % �.�i r i �� i F' � �6 � /' � y � � �� �i : i .�i � � , �/ii i : � : � �� f ` �/ s' ,� k°��zr� F>�'i>,.'��,,; ,�� � " } '� & s /r 1 � / �%'� %%i i ��� / �-�,}� �// �� J/ � f Sl �f..f 'Y < � fv�j.iF/y i / � � ��1 l/ /� / //� /� / � rl � L % oi�,. •' � � � �' � ��' y f � < �.�. ss � 'l�'i%i�%��i ��� % � i� y x£..� �', 'r�k � /��'iJ a� :. �>i�3 �f%% � %/ G� � � 'f �....,y „ �� `.J'u .�a ,� i i U»� . � Z�i �i% � i>>i f 3��¢ � s �ri✓�L � . �� �. % r�� �,/,/ , , �;; ; :�' r;� .,' � '' '�i�~;i. � 0 �'� � �,�i' %�i i e r r %%i m, /,/', � / `.'/i ' > a' . % �' r �ii � a+ f r� �% ,s�% /fj �� � �i ,, i �! d� %�{�rfi� s/,is r ��'�� J .%�� ` �<• L��'�# ;�: � ,i` ,,�,i `� � %:�% 6 `, � /° �� ��rr��^',��yF ��: °'�`,�'� i�,' < f i�` ,�y ii, li ` h� I� ,'�'v'r £ y�" �^ � i%i f � t'�i f ' �,`Ii >; l i �`� '/ r�i/�'� ��' f � - s` r " ��ti z�s 2' / ,�n� v � /�> � : i R ���` �'�f / � i� � r � "�rdk� / �� r �'� . ! �'a�":�` �ci r > � *c� � ,� � �: i ! 4 � �ii/ ,... � �` i��% r ,, , r' , , �, ,,%, �; . >u f , , �.� '�iii/ f � s �^3a%�� % �;''�` f` � .' . b i� `:;'; `> • f r s"l�,�>�j, �� �/� ',�/� ii.iy� �� / . �'{i� .,%,- r� ` 4 ��� � � c ,� .� r � r i �l i.P �I`,.�*' ^'°'^'r-A�^+«e�6,' 1�i� C�" �w tX.%� irB �v r c� f s> i. /s% "�'`. F '.,r,.xa ✓ ' ' �.�; %"i sE., s, � i"%'�°� %�i'/'%` END�`#t��IC3� CF�;° ,.,�>, _��,� ^` i; 4 % G r , �` � i,/'' %. ;� i �,, .�y ,. , ;�,�°�, '� � ! �.." , `"� ;�` , ii;� � � � ',�% �SS (S�SITE PL�4� �1%C1) frs c, f %y ' }Yf ^ � % i f ' j i '�/„� � � 1 4//j i L � � `/'•" � �., i�,�,�� � a / � ��� � � y � � i i �'"'� ' /%f. : �r �//j � G� j �� L� ��`.� y ; ����i%ji s .�j� � ✓I� Yi // i. � % f f�� /�{ // / ' fI i' :: x s `,� � /i `�,j �i,y� s �� iir i ���• f/`;,',� , . ��i` . ' � y�I//,�nii%i F �E `/r $%.i /j,� i � ) i,� ;''�,u :�� ,� / i�f` � //, f �i �%i���' % j � �r�� � £' � a � z'&%:i ` � 'v�zz� < E< 5�' �.,� f� :' i/f i/i : �./� y :��//% % i'" '/r i �'� � %E �;„ �;c�:, � i'"`�; f � %./f �. � '!, i':'//!/ %'� '//�'i/' �% /�'/ y . } =cix. r a c} t f` � � � �f � � i r � f i �� �/i, s��i. � �' '� f �. �%��^ � �z�i�y� =�fiY"�'�, ' � sr r ,�� y�� f �.� y,��, : �% f .�. a � �v� z f 3 , f �C �j,/� #� ',•�,, f �l. ' �'� ` ii�� / i , �'� ' f ; r s �"� � i� % �¢ �;' '` :. r� to`f f % A ��i �r 3 ' z a� 1 ����.e'�f��.•'yy�ws�i.�,f, f'� F�. � w„�_ • v� � �.rc�� ��� ��� , � ,bx�� �,� &% �.��%� �� r ii � #,., "`^;�..,, �. ah,/ f `,�` � `�. °, �':,,�a �•'� � � $ '�,� "% _� ..�. _ :_S"`� , , ; ,�`� TREATMENT P : ; �/,r; e f •y% �� � '�` �i"��� � , � �n i' � ��! /�`� £ e r �/� �' , / } � j� l � � f � f $ � r f � � �yr,��� s� ' � � , �� y"! % " i s. 7� . ` � +�� � ;7i;�'�, y Oa" ' oi �S'f� < �I%f � � rsJ% 4 � wrti3 ii i . �i.,�" , en � ��'f� � �F �k.�,i .,, , "/.7 ,; ° ^ f , � � .;[�E � � $�`- " il ^^` �i � �%� s . � ' �i ' if� L ' y%� "v . � �'iYM ',."�.� �' f <Y 3`�'t�' yyF<'�.✓ l � ...%� � ' �: � . .� `�� ,�%' � � !� / S l�' �. .ahi'd� i � � +� �� .4, q�� � ��\ i p' � �i �/ l if � / '�c �����✓���"r�'�`���in�ai.�� r� 1i� �. . m i i�i� i" . i. �'�%ij:% WEST END STAGING AREA AND BEACH ACCESS CITY OF BREMERTON DEPARTMENT OF PUBLIC WORKS 8 UTILITIBS � ENGINEERING DIVISION DESIGN BY XLO CHECKED 8Y NL WASH P E/ 3479f DATE 3/f3 WASH P E/ J0749 DATE EASTSIDE BEACH MAIN REPLACEMENT SHEET INDEX AND SURVEY CONTROL G3 SHEET � M 3 � 15 ' , ' , , ' ' , ' , ' ' � ' , ' ' ' I � „ , r, , i /° / �q� / ll � �i` /' s � ' � ` f� %/�� � /% „ � r''� � �% l �% /�/r.�' i f �` �%%` ` y�ori � �.�, � / `� � a y %'1`h , � i � ���//. �/F / y u„ � �4.%f%�j�, f /, 11 � //F/�% ' `Y' p �. �k � � 'ii / / '% ' � �' ir� %/�i /�✓�� /'�,� i..$.; .�i ir. /. � � z y�� � , �rf �/iii ' : .r/.! jiii �%��i ���� ' rk� F f � E�� .� �.F, �' . � ,....9'F qi` i /i� /" ;i/ � ��/� 9�// � / i /..,' ""�� %/ ��,' . . 6 � i�i ii�.r� / �v,' ♦ , /i . : � �/,. �%� /, i ,%i /// fF. %� i' ��,� � y � � � %�` � � � � � �il�Ir ;:/ /i.' � , r • � � � � r � �,i �i� �� � i � 'i�� i � % // �`.✓,,y� , i . i i � �. `/ / i . r �., F % /� 3 � . iw� % : ' / �� // � r s.�'i�io,i' �/i'�/%�/�.�i/.i.'�� =' r .L�� F�r ; s• � 'r � :� ii �� �/ i,/f t�r; i i i� y.��� �.�,/ // ��ir f F.f: �..i i/r i� �„ G i♦ � f,�/.i`.f�.i i,..f i ♦ / i f r i/ ." .G . � . /. x s f—E1(ISTING CYCLUNE FENCE r' ' i i• i � , r� �%$���% � % '. ; r %'� � / �i �/i � i �%%/� Ii'�, i , . � /. �f I ; % �� NOTE �i � r ',/,o .,�' � "; i S" i� l: � i i, �,' r �ri/�� / ✓ .: �i,�e." t %a. � ; ,� f � � ' % �� h % �' %%�� ����ii ��j��i• FF� i� �.�i�' � � J�'�a.f %��� ti i \�' i . �� ��3I�Iy�I%���I �;'%/'���:����:'i��i'�i� t SEE DETAILS ON SHEET D5 FOR AD01TlONAL INFORMATIOPI ON FENCE LONSTRUCTION n„r�� i % / � ', / � i �i, ; y� J � ��� ��'�f � �/y�� +�. /.1/�� j> > j% ;; s` ' ` 2 DO NOT OPERATE EQUIPMENT OUTSIOE OF ROADWAY i „'3 ,�'� � �� { /%��� , % • ' .�' � i � , �, ij� �%. i �i y %„� � � % �,i� � j 1 /%�� ` % �` \ \` \` ' a �.i � i . , % i �� �i �� ��f ; ' � i l' � �/.�� i �� i ��� � /� `� % /� /� �'/j/% ' i, ,� '/�/ 'i/% � %� '� ! .�� '� i i i J� ���� %%��i f // ��� �/i� � ii i \�� /. / ��'�',�, �/ . / �� in � �, / i�� 1ili ����i./:�//%/i / ii �; ♦ \� �w /f�in /i �. i � � ��; l� � �'��f����i��/��/�/�i�/ �i ,�/ i'.i., £ � � � 6 ,i � � r> " `� i r i �, �� i %�� /i �/ f i�� i �� !� � j'�% : �/ i Y �� .fj z i � i.��� i � � �� '! � ����' � � iJii; � / 1 % ���J/f�' r i li� � '��` � i�i � � �/��r G � % ' � /����s �jr %iij� ��/.� f i�i i�. �i�� '3��' f y��� ii.ii. ��' � i i �//�!i� i� i' , ii��q1 f/�/.,���i / ii ' " / �. • .r i / � i F i / ; y i/if ' p/'�I��• i;�1�" " � ff�f i ,�f �� ���`� i� /� .%%ir/`s�i'/.�i%%r'i�i�i/ ��' 4F��%��,'� 1%• ✓�i/ , �i� , i � � �, ,,�� „�/,. '` j, �f.� ;; �, / ��6 r , � � �:� i; %ir'.�,��i'� � �� , i G .� `c� ��.11�✓ 1 j i . / r aa i�/� ;�''�; / `���''l � i ��i ��%� i � i i �� � `i a�_ � /� if,� ,/i�,/' .� f'�iii ��''i:�i�i i %�� /% y' �� � ��, , ��',/ 8 i' , �i� �i" /%pn ji,/� %� �r./�i �,, i� �/i/1i �%i�' % j� /l y ��/i� r' .' f;. �" ,� .i��/�/f�%�� �.�i •//d ��� ���%y%%�. �/��5�. //f % i� �'� � ;/i ��t /pi f , w � � j�1, t ��/ �'f �� a��F �% /!��' / ,/,� i . / G. �� �r��i� vi % .a f � ��� �. / v/' "£wi�/ � {Si;,du�r ifiti� `I�� ,r' ' ffi�/�� . / ���"i /• �q� � �,�/ ' �. � �i ;/ �.,�� ���i�ii^* �'<s ,.z' 'i.� �P��%i..;. ��:..�,��i�.����%j..f/���i'/r�jj�,�a / i" i. r s .. ' ii . f /. /�. /`/.� / I i ' / l �i% r. F /a / / /. i� . / ./ . / l ���i ^'� .f./s i u � / / / . i/ � / � i � / I' , i, i � I 9 fu 13' .i� r i., i' ///i r/ f i / �/.�. / � ,..�' 3 � f i i 3f n' . ./ i //. � � ' � ` i/ l/ � F / i� �,i ii �1.� �if i I/. r�i � I/ / � f �� / �� � �/ / ��� l�i/ .� l / �,t�%r N � : '. �� l}s �j/i// "�' '� • �ii`il< yif� i � /. i ,�/� �i ii //�!l�f.il� � i'� �c �� %%v�j f f/�w� �'�'f� �x ,.l � i y `,`,� � � /F� ��%%fi/ �� .�I /��/ / Gf �/i il'�� %i� /� � /�fji /� �fi i i%7 4 �i 'kt� � f s � ii i r' //� �' � i �i.: � / //�' EXISTING ]2°CJNCRETE � ,%t i�%Y� �fF%/�//� . f%1 �-� if ,, '� "� % �'������ i�/ �%/./ �� �:� �� f 1/�'%/'��/ i... /%%i% BRICK PAVERS x � r % .�.' i <% � i � r' i� /i r /�/' �// iil�� • RETAiNING WALL '�'„" �' i i � .�r'�� % f �', , ..i<�jG,; ' : � • � '"�"" a r' �! ' l�.,F '� f� �: ;i / / . �f;/.Ff i��, ��' ♦ .% 'C3''' r i . /' i / / i / � f � a "�'� i ! '�'/ Sy �. %u " F i ' l i� .� � -����- � �-_/ �����' �i��� f % %./ � �;� % r r� f %i' v. 1 /// � ., 7i/ �L n ,'� J; i %/i` � 9 ' a V +. � � i' � i� i %�� %� � � � � � �� %; � if;;r /i ;�F � tii / t'.� r 7 .�s N,.. <. �, %•' /i j/�i� ���%' % %/ isi ii 6 CSTC COMPACTED M PIACE '!%I � �' � � i/ � i �� ir� / , /f - �;�• ~~ �, "'—'� � i � r . �/ ��i�..'fi % / �� ir r l i� . ! � >�.r�j .i �, '�y'.y:'i!%�i: i, F i/i` i � iiir, iF`��'14$��,7�1��%%1���� i �,'/,.� �//�.�/��i:i,�%f��%%����i �i,.,.� ii.. r / p rr� ,'%� �3 ii � o � ` , i� / �ii/ / .' � i /i l , �/ii , f .� �� �//r��;��/�G,//o/i%'', i n/., i . '/`� i • ' i i i i/ "� /iF i i s !. %. i�/ /I % /f i � / / ,I � Il : %�� „ i ,/, ,� „i, . f ,.. - ., // ; y lf� /,�� , % , �,,� .�,� �/ /, .,, r i.. i . �,,, , , � TRANSRIONTO r. 'y' i:� �/, / / �� � : ✓ ii�� iiii� F f �i//n%//,' � � ; • i%r /��� ' i �� . �� �i N.SLOPE �' �y >'/ i, i" .''�i ,�iii f���%���ia /�%/�Ily %/�if f.I% F % i�/' I ��� f'� f i EJ(IS7INGGROUNO �'� � w �j � ��/; l �. ,,,;, . ��, �/.iii''` ' `�/.a� iii . • f � f .�/ ��ir�/'% /r.�. �/!i � .s° � � v� . � /, l �/ %r / ,/' ' �' � �i/� j�s; i / '/ii �i % i ` ; ./• � �j % i.i r � i I. / i � S � ��i��� %y/ , ;`G r. v f , ; ii r�� /�ra/ � % /r %//iii/ % i r� i l/Y/�j��i� � �,/�i�j ir 4 ry � i ! � l�% f� i/ r ,i i i�.� � � �f%i fiii,�a, irI i�� ��'f ��'� �f;i. / i��/% ,�i JIi/% r / �`"Y� y f % � , ��" ` �/ ' �i� ! . % ' 3'`i' �,,� r�,� %i>," F/ ' , i // ��',3..,..: % f � /' � /. �.�'�� < ✓��j��/, � �i�% .� ..) �✓ �' � r l % / � i... . i . c � n i ` /.., ii //,��� � ni � �.Yr%'. i, i i�% i . , �� �i �% .%� � /ir��i% � i � � � ' vr�.! � 3^ � �i�%�� i� �f�Fr f �/ /i�� %� / i ii . /�� , � � i r'� u,r� 9' f i� � � / i . � `/r` % /f//!/ % �. � / i�/..Gi % <�� .� %' �� � .. ,/ �.�Ii�i! �,. F i j/,� � �• +/ '�'jj Y � ` f / J '��� i i ' . �f�/� i%r i ���. � u r �e � �: � rf... ,,ti.�'', �J / / n/ .;; -.� .,,�, ��� irk �F�� O �� F i / � i �y i i�i i, �, / � / � f ii '� if L ��%i �� �� �� � / / / f� �%����\/�/�/i n �.,.,a, `a,, %i i' " /f". ;. / � /���/��.i.�� '� � \ / / /'ti/. � j �`; � • � i � 3�'C�� ...v < �, i / /// � /' ./ ;' . % %// r r '` �%" i�.iF /.� i f /�i' i�� , ii�: �' .f . .t 3 / 4 .%/%� f F� ' / /' �i%�i. i; �f%/i �,� � "�' � , � , �`/t ., f i / ��� ', , � �� ,. / /i �` � f i / /'j. � ��' � 5,� /� ii� �i f'F .'ir //,,� t� � i r.� / `�c %I r rv iz � ri �� i � � i �/ � � F % �' / r � i /� � l / � / i/ /+l � I/ � / � i � d `% � a ti i ri/.' i.ii; : '%ii i i %':.'� . . / � ! i �� ; r r. _ T�/�' .. e� i //',' ///, % `. '"/,;;� . r /� � 1 � �� ���/'%/,��� flvii �ii� �i/%%�.� � � G'� u%; �., �..,� � i � i 7'� �� 1�',� ':, � � /`f , / �..., /./ f ,/, i ��� r` ,�! �i/. '/i ���' / .i � '� '/r. ' � � i �/ . ////ii''. ,,�/.°, � i� ;, ;r r � ��. � i �i�/ o/•/ ',� yr'S�` a• w ; .�o/'/ .'"� / ' � %.� , i%ii� ;' ii i %.' � �/ � f/.i i �i � �i %. �/ lii� i / �yY,yr , j / ' .�� �` ` 4 y r� , i . ��f0�lE8.%/!%' ; �'�%:''��� � y f f ��j. �.�'.� i //%� Y� ). r�l � l/ //,�J , /i�,f ' ,/,/,/'/,' ,,/ �, ;%/`��` ` .%�i'�fi�„i� i Y �,<y ,�.� '` . i'% ,,,� �1N��t -�,CE. � „ 'i� %� i � � .. / a '. .d � ir oi.1.i. /� . % �% ;' �/� ' i � � " 'l/Fi/ /f . y� p �;ilii%r�i�% i -� f fi �i�./ �/ i� ;i y � i;,f%f f/��/i f%//i� / %x� � `=��'Z7�"F`�/ .i �i'/. `�/`� i f /�i i� fGii�/���I//.,�i��•.`%fi%�i ii• %'r/���;/,/��i�� . i i F�l�y//� r� r �" � � % �%'... /+ �,%��i f�� i�%. ,,.'.i r�i i, f �'; ro ,. �,F'�f ♦ /i /,: .i i .r fi' i� rr- / ' i i ' i i r / i �� i i�� � r f / � I �/� / � . ./ i�/ .�/ i i. % ii/ '.i / i /� "f, 1 � �,� r� f'% ..�. :i � r i .���a f r` /F�;//: , f �'/i/i /� ii�i.�i� � 1 ROAD SECTION i %, , ; =�, f � , ; ; ,�, ' ,,,o ,,,, ' „',, ./��„ •,, �ri� / ; ��/ 1 n' �. �� ��" i '1 ' ; if �� i ( r. � i .i � /�f' ; i i 3 : i % • f i �/ � ,. �r�i ';' '/. @' .. � i / i /�; �i : � /' , % � ir ri r� i ' � i �' /'/� 1 � . i / �. � � f'n: i . � � i :� `'� I/% i/ � a/ ��/ % �' �� % % i C1 cr� ' j.. 'i � fi✓ i i 3% i, i f i% ~ i f%%/� i�� j.o /�/.• ` �� / ! :. � i//�' ♦ / /r� /�i i> �GUr y'"i',h � � �% !%�/ii��/rG �. �i /i� � i uiiii� /� /r r r..�i %// /r�i�ir ioy�. . SCALE 12'=1-0 /� : I i� ,� !%`r'�...f i i . �I. � ' i��i %�/j/i .ii/i,/'' ��� / r %' ' � � i� s �;�f. ,�';s`. i % � ��%f% � �'i v� , i/����ri iS: ' %%� :.%%ir.rfi��i ir�%� �� �', f � y. ��� � i^ x iri ;s., / / ; i '/' i' .f �� r / / i%/r�'� � fo i % %;, � //�' � �� ' %. 3 y /l f� l s l//f �� % F � l f n% f� � l f �� l/ �� 1 f �i/ . i r r °�'� . ` � / ui :f;. / i' �ii � / '' f" / % � / / f // %i `� � � � i� %� ' i � �� i y����� f% %i "b / i. r. i i i i/, � < � n / • /s i i r .� /.. ��'� � i �� /l/ /3 + l Y / � / •�.�r . 6 r �. /', y '. • i / � lnF � '%' �/ / f f ff ff f'/n � % �/ / /� �� %/ �/ / i � / �i ' / /� .J / � /: � :i � � �• / i � t air ..� i/ i / i i i i/, i�/ �. ♦� .f F / i ' i / i f i . i d �///// .Fi � /� , ���w / y �� f�iiifr �/ < i�i/ f /i / � � i %1iii, .� y� . l /`•% �// ���''+ \/ �/. ��//�� % %%� ` % %" % ��%� %�lf �� � �/I�� 1D/� �i/ �/ J�' f �f / � i /.. f,, i/r %/ i u.ii i r,. / � �,. /, , i / � �� � �i� if �� "/'j;^/;' � �• ••//, I ' f� �, � ( �� l ��i� % f�J/�/��i �� �r %/, //� i ��i'� j�%" / �� � f i � � �,�<f .� if. �:. � � i r.r � �.� iiff��/ jx ♦ > `, if f / ��i � ? �,/, p� � � ,. �F �� /. n' � � sy �� { / � � //�%� �� f � l � // 1/ f �% /�'/��� /� v �, ir / '� ��' � � ��`����fi ; �• , i %ii� `'i1�ir ' :��� i %i�' s � .��i�� %j f ��' �/,/.` �:� ��i %'.�� � % % �r y `� ii i '�:., !�<<:ii �. �%� ��/i f i'/.:'% �i� � ��%%%1/%,'� �. � r i ��> /� � . i ii 6� ;i :� / �iiii i/� � /��r�i �ili f � � � �, y; `�� �" r . , �;g��-�v,, � �ir.� i... � /� /��.,!' ,� ���� '� �: � �< , r /,i 'ii /i' . : / fl i // i /ir ;t / \ : �;.�i � ' � /.r' I ' �ii �� .. F �i�/ ��� % ' '� i �� n/f %�'/, ��' ��,° / �, /� i �S y �' �, � / v ' / i / � f ��� r i i ��� / i ; . �/ .' ` ' irr '� i / ' /,/,il� � � � %// / ii� ii� � � . � y �� " %� n� ��: � � "y!��;.�`� ^�i/�i�ii�F /� �1 � Ei�/�i%/ /�ii� � % �i�i f% � � y i / � % fi /' � ''i � % �1/. � f /rri /i %i ' i l %% � F � �` , 'i� � ' �� f � ',� 5��. .r ,/ f/ j ii ffy.f./;r ��� i F i � ��7 :� .r � ii%� � y r � ��.i / i;, / �/ % i i •%. � i'�is./f:,Gi i .f � � : �k� �%r /"'/�i iG � � l � � �' qi /i � /i� � n 5 SAW CiJT AND REMOVE EX�STIWG CONCRETE WALL AS � ��° � ,`' ' � � '•• / :,, �r� , '�', /I „ ,��� /f NOTES /,` ��% � � �� � � �� / t , / � � � i` ., iii ;/�' �� � i 'i SHQWN ON THE PLANS TO CONSTRUCT ACCESS ROAD %� �; � %, � g�qq� �Qp �p� �r` i..` " r�� " '/�� ' f 1 THE WEST END STAGING AREA IS LOCATED AT THE BASE OF � , �, �, ' % � ; `� ,i , %' j , �' � � - �TRUCT NEW �a`w10E f EXISTING WALL IS 12" THICK REMOVE TO MINIMUM 12" „ DO;HQT pi3't�1R�„ ,�. �� �„ y��� „ � ��p�g Rpqp THE EASTSIDE TREATMENT PLANT IN EAST BREMERTON �•!'%� � � � � THE SITE ADDRESS IS 2475 STEPHENSON AVENUE, BELOW SURFACE OF NEW ACCESS ROAD ESTIMATED 200 �;/ � i, `�� ,s�%� �;� � $¢ pjp� $, i' '+� i�� SF OF WALL SURFACE SCHEDULE� FOR REMOVAL GRIND �' �� � � , /.� ;� "� '<� �; t1,�° � �� �r.. BREMERTON, WA 9837 � THE STAGING AREA IS APPROX �', � ' � � ' ' � "%'; � " "��f .' ' 1 ' l AND GROUT CUT EDGE OF WALL SMOOTH '�, ,,; �� . � f �; � "� ; t p[EW 14' WFDE DOtiBLE GATE. ` 3500 SF OF ASPHALT SITE ACCESS IS THROUGH THE GATE � � �; i. � £, ��� '� ,.---` } .�i , i �:i .•1 as �.„--• 8EE HOTE 7.' 9TAC�NG AtiEA ..✓' ON STEVENSON COURT CONTRACTOR MAY USE SITE FOR 6 CONTRACTOR TO INSTALL 270 LN Ff OF NEW 8' HIGH FENCE DO P10T DI�TUR�ARF./� ,, ';; „ �� f �p ,»�� �/ , �� i.' / �f� � :£,.v'�,. , ., STORAGE OF ALL EQUIPMENT AND MA7ERIALS AS WEIL AS WITH 18" HIGH SECURITY WIRE MATCH EXISTING FENCE �/�� O� �„ ,�,��,�,�,�; ,' , , j �� f �%, f f ` �; ��"�� � � . / i, i� %r % i . ' i BEACH ACCESS AFTER ROAD IS CONSTRUCTED FOR OIMENSIONS AND ST'LE FQR MATERIALS AND �%; ��'%<� '� �%� "� % ir �'� %';; %' _+s x� ${p� $� � � s f � y�1�� / '� � `�//,: %t � 6 � CONSTRUCTION DETAILS REFERENCE WSDOT STANDARQ ���j �% ��f iy f r '� / ii F i/' , � ,. � r 2 DAMAGED ASPHALT IN STAGING AREA SHALL BE SAWCUT p�,qNS "L" SECTION AND STANDARD SPECIFlCATIONS ����'�i�, � '�' ''i" h"%�;� %o%%�� ���• %�� �`r ��G �� i j , � i ii /. ; i ;/ � �� . �� o r' i r REMOVED AND PATCHED WITH 3 THK ASRHALT OVER 6" SECTION 9-16 FOR TYPE 3 FENCE AND GATE ������� ;� ���%' ��% ��!��% �i ;,> �{ '� !' ����� w`41!" , ' �� � i THKCRUSHEDGRAVEL ;,•,�f';f%/� r'`; :F,f;%:�� � n, � . 3£ENOTE.SAND$HEECOS .; / . :'ii' � � "��,�� :%%� .' �` % /' 7 DOUBLE GATE SHALL BE 14' WIDE X 6' HIGH WITH 18" HIGH �'%',i„' %!/ j�r'� � �%�/'! % • , i� �,� ' , 3 CONSTRUCT 13 WIDE X 6S LONG THICK ACCESS ROAD AS � �� � ii'��!�:'r>/. ������ � :%' % �� %' i �%; � ' � , . % % SHOWN ROAD SURFACING INSIDE WALLED AREA SHALL 8E SECURITY WIRE REFERENCE STANDARD SPECIFICATIONS � f;�� /�� f ��l.i�,�;Jp � ;%,�', i ;'G,� ',' > F ,.� �' „ ,�~ ;; ! �� PERMEABLE BALLAST TRANSITION TO PAVERS OVER CSTC SECTION 8-76 1(1)E FOR GATE CONSTRUCTION AN� �l ���l�� ;'%/� %i� ' �� � i� , y `� ; a; /y !, I 1 P � / i/i/�% r • ..i'.. j t %' � a�r ����� �� �I��1s ���3�i ���f �� MATERIALS PROVIDE WITH DROP-BAR LOCKING �EVICE , � � ,/• r�i ,; , ; „ i , %l ;>;�, � , „/ � , �, ,�>r� �f� �,� 6�� � �3� a ;ys ;���{��'� ' � AT WALL AND CONTINUE TO BEACH AS SHOWN ON THE '�• �f y � i���/%y�%`�a, ..�// t/i ii ,'% 2,` �y '� �i/i � , 3, �';t ;�',� �'7„*, , r '� ��<' 4'il'/ i .. % y%. :�/%% ' STAS3WOAFiF/1WHIR$ � �Yr .'�'iti11G%s , �D� I , '� , r PLANS CONTRACTOR MAY PLACE TEMPORARY SURFACE 8 TO PREVENT THEFT AND VANDALISM BEFORE ERECTION OF F /� iYf �!; �� �7%� � ` .r. �ia�, „ � . /f, ��/. � ��. ° � '- ��� °� � '�%wy'"� ; fy , � n CONSISTING OF 2"�" QUARRY SPALLS OR PERMEABLE NEW FENCE, AFTER WALL REMOVAL PLACE 1EMPORARY 6' j��i� �;' j��%%%�% %/<, r;; %��i ff �� ,�,, �; i% ''` ' � „ �� �� / ��� r l �, ' f �� ' % �` ��� j � i ✓,B i� l' � i �i i�q fF f 'a BALLAST AND DELAY PtACEMENT OF PAVERS UNTIL HIGH SECURITY FENCE AROUNO STAGING AREA AND AT :� �S�";f a��. j i fI j� � t`� f F � �QN �/u'��; ' � 1. ,, , ,� � ,� � ` y � � ,�, % � , ,�, PROJECT COMPLETION ANY ROCK DRAGGED ON THE SITE AS NEEDED TO COMPLETELY ENCLOSE ETP SITE '�//��� k� �;� f� i j � i %'' SHEET�QS ' . ��'! �� � � , , .. ���� ;'/F , �� f. /� /�/i% ,, , . S� BEACH FROM EQUIPMENT SHALL BE REMOVED QAILY AT j r,:" '�s ,/; �,;; �/.'� %' i �.�/�f! �, ' , �' r ,,% � � �l ��'�� • /��`%% %�.�ii5i�f,f� � i < � � � . , f , � THE DIRECTION OF THE ENGINEER e'`� �J�� " � � � l � �� �/ � � �� �f�� .. / YY ,, ` r ' , �� �' � fi �»'��/ ����i �� �i' fjr//5 � y � � � �'i ��'1,��' i 4 OEMOUSN EXISTING 5 HIGH PENCE WITH BARBED VNRE ,�.�� ;��'�.�//�,�, �"�/i j%9o���/%j ��j �! i��/!,� y ��'/��., f ,�f' % ' ' �, TREI�1M�fFf „�, %,' � AND POSTS (250 LF) STARTING AT ACCESS ROAD 01NNER ��`�s�� i i�`�����' �'�� x�!�; ����� j j%� j/ f;���%� � % i `%�� � i� �. � WILL MARK LIMITS OF FENCE REMOVAL IN THE FIELD FILL �".�*�c y�`��'i;�` ��� iwn ��E i % �ti��'��� � %�' ����' !i" > ' ���/�� / � � � t POST HOLES IN TOP OF WALL WITH CONCRETE ` � � � f � f�� // ir u� f/ ' �'', � "J ,� l ' ' ��,�` j �y �� ix. �F�� ��/� .�;,,/,,,���%�� ,. �,,,,,, � " l °'} N ' �i ,� � �`� ii�'� F° �f � ��� %i/ /%vy�%�i�� �. '� ii:r' �i ' �i • � %! � � ` 5 > � ,� % „�2'� �✓ �/�ij ��� S�r �<�. f/ %i Ji /' ; i i y � // /„ , C ��j `�-vH��c����� ��fr /%i/^��✓�,�� '`i���i'%��� �� E i � '% ��Y � / � i � i f €��,���:j �✓'�/'�,�`,%���s%� ��'%��r �ji//��':%/` i�^� ; i � � �i , ' �in , i �i 't.r �"t�a:„�`� � ��/ fu %.j '/," `� �>�.�, w/'. � �� i / � � .,r m s i i e��rL n' / :r : /`" � < / � �i ��i f �f /, ' � / i.f' .,,rf i i� f �i ° � * �iv t>zxir //�c.N �� f�/�����r fl,��.,.�. �� , ;. � . c `u ;�if `r� � ��/"< �`'`+` r �"''.�. i {���fr � �� i �`�i'Fi'/i. � , i�g . ' � � . � '� i � y �r �.. �v n uc/i � y �'� �% � ; �� %� � � 3;, /,�./,//. f .� F , i •'�'�'' t �/,i� / F". ti7u �/ ✓/r% �� ;`: �' � �i/,/.. i � � i��'n • !' t%�i i�' � � � �7 y � � i f /���/�: / #� �� �7 K' � � „ ' i� n i i y u i %�w, fihu. � :c� �� % % f:il i � ��/Sf f, i i�i ��., i / � %i�i y3?�f��,G�.��..sk�%5�i¢'�`t h`�.�`/i%%("�'�.��i..,%>''r i,/����%ii��i. J � SiTE PLAN 3 sca�.�• , ° =10•-0° � � P �, JoHN {y � V pF rA9y � CC �° � �� No oESC�wavn�o►Si IONS �� � o � r Fl� e� CITY OF BREMERTON EAST SIDE BEACH MAIN REPLACEMENT C1 � DEPARTMENT OF PUBLIC WORKS 8 UTILITIES � u � a � T'"°'��$"r�"`s� ENGINEERING DIVISION WEST END STAGING AREA 4 � '�� IF NOT SCALE ACCORpiNGIY y ' � b7 OF � '�� (� � SCALE DRA1NINf3 NO o �� � TM oESicN er wro c►�c�n er Ni qND BEACH ACCESS ROAD Z 15 � 5� � NoRIL NOTED �� NOTED pATE 3 13 MU�SH P E 34�81 DATE J/3 WASN P E/ 30749 Q4TE J/13 ° w �'i �� L� ' , r 1 � ' , , ' ' , ' ' ' �J ' I ,, SSMH I � I , Top=130 61' I 0 ' 1 IE=120 85 18"Steel N !TY OF BREMERTON ClTY OF BREMERTON IE=12o 78' 18"Steel S ENT LANDlNG PARK ' 1 1E=121 36' fi" W � ASPHALT ROCK WALL I STfPHENSON PROPER7IES LLC , JANAPPLETON�S � LANDING SDMH � , STAIRS TO BEACH '� °a° 80' SEE SHEET D3 �' =_ ABANDON ' FOR CONNECTION 70 EXISTING PIPE ! ` ( _ � ` --_ ..�. – '_ , � 1 0��'-' � _–� _ _ -- —' _ \j�;.;� _-__ = e �_ =_=._ � ` `_/,�' ,,,--' �Zp �—� �" , , �r �� ��,',� _ Q`�, — ^ ==_' -__ � ��/ STPL`si•35 i' i '� '_ -'- AGCESS PORTTEES � EX 20" SS (AC) , ��-t - _f _::_ - _....� .__ "S`EE SHEESD4- � FOR EX 20" AC ♦ _ + ' — - - - - ` �' -- —TOB -• � ..�--- - .� --r ' - � + � � , - � - - � kP}�ROX 57�.`.�+30 a _� F9R-&f17�` SEWER �� 'RQCiC11VALL �'- _,_ - - - _ - .-._- ... --�'-_ �•TO � ______- _E7�'20'"x 1Q" WY .__-.,��0.' _ CONNECT� , ---__'--- ----,•. +_. - ___ __ _ ___ --- ---------- -- _ ' 4 B` � ' - �' / '� __, �� �� � `�� `` � � 20 � -` ` - �_`_------- 2 --- O _ _ _-ss_ __ __ __ �SS— __ SS _ � -�. —_ - - 'S �Ub �" -� _� - �� ` Z` ` '��,� a �'' --__ _ __-'---------------------------- ------ -_ � � _--- -�----- - ------- -� _` _ _� -- �}� ' - 'S � , ��----___ ''------------- -- -- _ __� - - �• s* ���. '`�� � Z -------------- -- ----- --- --------- --- - - -- -- ----_ -------- ----- � , ��,_ �-,-.�__�_,_ -------_--- -- ---- -- - __ _ ' � - ---- - -- � , _�_ '-------- — ----- --' �, -_�___ __ ________ - ---------- __ __ _ ____ _ _ _ � ' - - �- # v � _- ' -- � ----- 115 0---- NEW 24" SS (HDPE) 1 ?5 0 , o - - - --- - '`G�� . - _ ----- -NQ'C�,IY?ICALHORF�YONfTAt�31ST-ANGE----- - ----- - �, ~��``- �� \�'-- ___BETWEENEX3a"5Si\1V 24" �.IS__-- — -- _ _____--- -- -- _` _ ` ___ _ __ _ _ --- - _ _` D-NE1lY__ � ___ ___ ---________ _ - � �' 5'-0" OkR'SIDF,� _ - y - - - - - � - - � • __ f _ __ � -__ _ __ _ _ __- -_ _------- ----------- - ��� -''`----- _ 110 0 - - _ _ _ _ _ ---___ ___ __ __ ___ _ _ _ __ - � _ _ _ _ i -- -- - ----- __ - ------ - --- -- ___ _ _ -_ _ ____ � ' - _ _ _ _ _ _ EXP�ED CR --____ _ - _ __ __ ^l- __ _ _ _ �_ _--` --- -- - ___ --- _ . _ _ _ - -�EX20"SS(AC) WNOF �--�` � ` _ _ _ ' - _ ` _ - ` _ - ___ _ _ _ _ _----- --- --- -_ -- _ _ - - 130 130 225 00' 150 00' 175 00' Slope = 004 Slope = 012 Siape = 022 125 1 � rl MHHW = ]21.57 EXISTING GRADE - v 120 120 co u� � v r � o 115 0 NEW 24"SS (HDPE) + �o Z � ��� Q MLLW= 109 83 = ZERO TIDE � 110 — F s w � t05 i 105 U � Q a � � s� 0 '� M M C7 [h M M C7 l") C7 C7 O 01 aD t� tD O f0 N '� � N � � O Of oD 1� t0 � tf� �� �+'f O 1�• C 1 O 1� '? Q> � a0 c'� r t� Qs f+1 O� 1� �' N C7 t0 O OY e7' N f� V M f� N � M � N � N N � N N N � Q) N � N � 67 � � 01 � O) � O� 01 � Q1 r . Of � 01 r oD � a0 � aD � t� � l� � tD � tD p t0 p �i I� � �w �w �w �w �w `�w �w �w �w r w `�w �w �w �w �w '�w ` r w �w �w �W � 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6a00 � z M J�HN � � v\ � q epyy d cTj � � No o� a � � o � r fl°-D 8 �K CITY OF BREMERTON EASTSIDE BEACH MAIN REPLACEMENT C� � swoinicr�sarFU�.�sca� DEPARTMENT OF PUBLIC WORKS 8� UTILITIES � R��°� IFNOTSCALEACCORDINC;LY ENGINEERING DIVISION PLAN AND PROFILE m o � �«a r��4 3 �� I SCALE �+^W�"a "� ow „p,,, B ,, , oes,cn, e�, xc,v cHec� er nu. STATION 1+00 TO STATION 6+00 � 15 � HoRiZ 7' � 20 VERT �� 5 pATE J/�3 Wti+M P E j 3479T DATE 3/13 WASH P E � 30749 QATE 3/13 � , , ' , ' , , , , , ' ' � y � � , � a � , � 0 ---�--� - -- -- - — � i � RoGKwH � � � � \ \ ' / � � ,oM �2a 80' � BARBARp RHODES � TM KpVAR � oN l � GL�RiA \ Sr pNLE CA I ;op= / Agp .�,�� ~' 24" SD OU7FALL RYN� Y& ^ '' f ' �, ` �PARTIALLY BURIED � \ ' r � ,. _ , � � `, � � IE=115 73' / ` - 1 d �� � � DIVERT ACTIVE STORM FLOW AS � �,� ' - t ��,' ''�\��� `, �� � � NEEDED FOR CONSTRUCTION / � � � ' � , '. t � ; SEE DIVERSION DETAIL l � E SHEES �R ' , ` \� _ � �. , ', ,, `Y, • / ��v�s�-�' ,, ,� � ' / — — � � . `. � � ECTI � , `` � ;�\ \ � 9 ON l , \ - ' � C �� N ,'� � V ``• \ � ` / -- _ ��- - � _____ " � �'' � �� '^� �`�� � SGS MONl1MENT . , � �.y; �, ..� _ � ___ _ __ � � `\ \ / EX 20" 5S (AC) ------ - � ' � N ^ �. �, � N ` � WOODY DEBRIS � �, � _;� y �\ `.`�,. . s � _ .. - - , - - ' _ -'" ` _� '`-- n ' /� ` `. � � •• � _ . _ _ _ - _ � - - _ _ _ w ` ��Q �`_ ' \`�. i� . � �. , � _ _ -- __, __ s t r"• " -� � � t , � � � _ T ^ ` _ _ J , _' _ _ - = •�".+,."'� <u . `! � _ _ - _ ° S � . ' `�,` \' � ` ` ,' `T0 6� .� ,,,, /' -`'� - ! ` ' ' ^ ^ ' _ 3s�-'° "` O p - - ' _ " � .. _ / � � ` `,� ` ` � • \ Z � � i " - - - 3 ` - - J -` � �'"'".s -� - - .. � Y � V t / `\ \ l \ \ / � I ' � �"'..�.� .. .. r �. � d V Z 0 �� ` �. . t `. .. ="' _ �.��. �------ -- - - ' ° -' _ _ _ _ ~__" _ _ __ - _ _ - - J � ' � � l i / � ` `�� -'_ _ ` --- -- - --- -__ _ _ _ _ .` - - - ` ���"�! _ - -- ' " � ~ _ ' � _ V � �Q " � �----� - _ss - -_ _ _ -- = _ _ - _ _ _ _ _--- _ __ --- _ - r r y ,', ` '� �'�'''� _�- _ - - -- - 8 - }9 � --- - ___ O '" _ - -'_ � - � _ _ - - - _ _� _ -' - � - ^ l EXPS1b`EDCROWNOF � __ ------____ __ __ __tl5 � - = �" ,� -' , _- - -- " .- - _ fX (AC) . ' - _ _ _ _ _ __ _ __ - _ _-- - - --- - ---- - - - _-'�L, ' _ - EW-24"iS�DPE) _ , 1 1� � " _ v _ _ - , - ` . � - NOTE lYP1C_AL'FiORIZON7At ° _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ = _ _ , _ - ` — " _ - - - - - - " . � AIST/CNCE BETWEEN EX. 20' SS AIJCS� �- _ _ _ _ _ _ - -_ _ - - - _ - - _ - - - - - " ` ' ` _ - " ' _ � NEW 24° SS IS 5'-0" (OUTSIDE 70 - ` � _ - " _ _ _ _ _ _ _ _ _ _ _ - ' 105 p _ - ` . _ J OUTSIDE) _ _ _ _ _ _ _ - - " _ - - ' " - - _ - _ . . - _ _ _ _ __ _ , . _ - - _ " . ,- - ___ _ - - - 125 175 00' - Siope = 022 125 128 N U W 115 W ° o m Z 110 A , W � G �, 10}/ ' v P oP ��s �9 � - i� � % 1�/ , 3aTni ' �'�its760.� � ��.ti � �5��3 � w �� J S F a 100 � P�. � N �n+o �o •- •- � � w w 6+00 REVISIONS QESCRIPTION O � n o ;? o w �w 6+50 800 00' — Slope = 0028 p MHHW = 121 57 �EXISTING GRA�SE p MLLW = 108 8� = 2Ef�0 TIDE � NEV1l 24" SS (HDPE) < � � � N N � p � � � � � � � � � N � � � ap m Q� N Of tr C m pp c'� �" � r f� r. r � n � n � r � � � � m � n � � � ti � o � o � o � o � o ^ o a � o 0 �° �° �o o . r - � �� .- '.' � W � W � • � w � ' �w w � - -- '-w � � w w _ _ - - - - - 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+5U o r 2 on� e'� Q��I TN10 INCHES AT FULL SCALE If NOT SCALE ACCOROINGLY SCALE HOa�2 1' • 20' VERT 1' = 5 FlELD BOOK " ow,wN er m _ DATE 3/1J CITY OF BREMERTON DEPARTMENT OF PUBLIC WORKS 8 UTILITIES 8NG{NEERINB D{V1S{ON DESICN BY WJD CHECKED 8Y NL WI�SH P E. 34791 DATE 3/]3 VYASH. P E. / 30749 OAiE 130 125 � 120 w w 2 1f5 0 0 Z 190 ¢ � w - 1Q5 ` 100 rn o a' ' � O w `� w ��+�� EASTSIDE BEACH MAIN REPLACEMENT PLAN AND PROFILE STATION 6+00 TO STATION 11+00 � N 6 Ij OF n 15 C� ' , ' ' , ' ' , , ' �J ' , �J ' C I ' 1 � ' ' ' � I � I RIP TIDE f o 2 3° PLASTIC I � + i DOUG WEEKS C�NSTRUCTION ��`�N OUTLET � EI=12Q 15' � R1P TIDE C NDOMINIUM SEE NOTE 1 I � RIPTIDE DEVE CO � � ! � 4" PLASTIC � STA 13+87 CITY OF BREMERTON � f � f EI--�1 0 OZ TLET ' OR S DE � ! � � NOTE ' ' ' ' SEE NOTE 1 CONNECTION � WOODY AND MAN MAC � pROTECTDRAIN PIPE f ' � _ _ � _ _ _ OUTLETDUWNG CONSTRUCTIOK ORAIN COM/EYS 3URFACE +�^ — � ,� .� � - '��` - � _ WATER FROM UA SLOPE APARTMEM COMPLEX �_ �` � -- -,, 12p p ' ' �TQQ � ' --'-- � --- � -AR�ROX a STA 13+9�' `- ' ' -- � � � i ` � � �r � �_ _ ` -- � ZD�XO� _.._ --- - ..� � ` , — �-- —�_.,,.� � � ` f ��- -- — � _ " � _� - �� __ ----- - APPRL�Nr{fl£A�{(1I1L " - � �,�•� � TOB EX 20 �35. EAG� - -' - _ _ _ � v � -----� - - ` _ ----�--- ��'--- -- ' - - - ' _ � ��. V h --'"._ 1�- ' _ � - __ ' _ _ _ __ _ ----- �' ---- �� / � --TS� SS---_..-�__�_SS._ _ , -__ ` ' .1" � � h - ---N � . _ --------- - - ` - - __ _ __- --------"�� __---- '+ ���- --- ------- 1s+oa , �=�zs �' �� `� � � ------ - . _ --- __- _ - _ _ ____ ___--- - __� _ --- -- ------ __ _ \ ' _ 11+00 _sr-�-- ---..,_.�r =..__ —,_..—� ;s — 12+00_ _���- __-- ' � I _ -`� _ ---___�_�-- ------------------- - - _ _ � _ `- ` �6xp i "�f---�--e�---- �- s � 115 0 _ _ _ - " '' ""� _ - roEW 24° SS L y - � "- -- _ � 1' l ` -- o ` � ------- - ---- �#�o ----- -- -- - - _ - __ - ____ -- _ -_ _ - - ' . . ____ _ a _ _ __ - - - - - --- -- - -- ---_ ____ __ _ _--------- --- --------- --- _ _ _ " ^ ti00 '- `.. ' -- �� o __-- --_ '_ _ � , 2 -`�- --------- _ - _ __ _-- - �' __ ` - #11 � � z o --- �' -------------- � . + ___-- __ __ __ _-_ __-- __-_-------"-_ _ _ _ ___ __ � �- _ o ' -----� F - __ __ _ _ __ _" _ -- _ --__�_ - _ _ ` � `U _� _ _ '- - --- -- - --- __ ---- - ----------- ----------------- __ -_ � � ` � ` � . _ _� -- - - ---- � - � -----� � ---- --- NOTE TYPIC __ __ " _ ---- ---------` --------- -------- ' _ �_ ' . -- , ' . ' `'� � _ BETWEEN EX. 20" 3$ANQdEW_24° SS-FS� _ __ _ - -� - _ - _ ' --- - ---------- 105 0 - - - ` ' _ � � _ ------------- -^ -5'-t)"�OUTSIDETOOUTSID�)-, - -- _ -_---- ` - - - _ __ _ __� -" � _ - ___— -'�- _l__---- ---� --------------- -_ - _ _ _ ~ +~ ' . - _ ~ . _ _ _ - _- -_- __ ° _ ' - _ - _ _____-- _----------- ..,, ., _ ---__ _ _ _ . � ` ' _ . ' _ . _ 130 130 800 00' 175 00' Slope = 0028 Slope = 017 125 !25 rl f?dHHW = 121.57 120 v v 110 F- _ �EXiSTING GRADE _ 115 0 0 113 � � � � Z — MLLW = 109 83 =�ER T � i10 Q _ N�VY 24''�S (HDP� a 710 � � � � 105 � il �� a U C H H d �� � � 1Q0 � rn u� cv o n v ao u� ev w n c r rn co u� n a� ° o ° �r- o c� �w �`o �`r u �v N 'e rn �° n.� r^ co`° � m °� �c'� rn °° nn' u� o° o a a r m ao m ao ao ao 0o ao m oo co w m ao m rn o 0 � u�o '�o �o �o �o �o '�o '�o �o �o �o �o �o �o �o �o �o m•- �•- N� N ; � ''w �w �w ' '�w �w �w �w ` `�w �w �w ' 'W ' �w �W �u� �w �w � W � 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 � P �, d Oy�. � V� oP r �sHi d 9 � s�` `o REVISIONS o +- r �° B CITY OF BREMERTON C4 �' m No DESCRIPrION �,TE er DEPARTMENT OF PUBLIC WORKS S UTII,ITiE8 EASTSIDE BEACH MAIN REPLACEMENT s�� � '� �+�v� TWO INCHE3 AT FULL SCAIF � ''��$*�° � IFNOTSCAtEACCOFiDINGLY ENGINBERING DIVISION PLAN AND PROFILE N 7 „ �arAt � t3 SCAIE DRAWINO NO � oF � �y � DRAWN BY rH n�s�cw ar wrn CHECKED BY NL STATION 11+00 TO STATION 16+00 15 � reoRlZ 1' = 20' v�x7 1= S' pp7� 3/t3 WASM P E / 34797 OATE 3/f3 W/lSH P E f J0749 DATE 3/13 a � � ' � �I , ' ' ' ' ' ' ' ' , , ' , , 1 { P�ti' " ( WARREN AVE BRIDGE o � B � E � ERr �N BREMERtON � 200' �.o w CI"fY o� BRIDGE PIERS Gi7Y U U WOOqY DEBRIS STA 18+98 2 'r� AIR RELIEF VALVE _ .- � `� �'� �n '°� - � � � EX 20" SS (AC) IOCATE VALVE VERTICAL ` " � `- � � ` -- - � � U - _ _ ` '� � � RISER UNDER THE WOODY DEBRIS ' � � Y � -- � 16+pp � SS - — - ---^" " T9B. _, - - - - � � ` - � � BRIDGE CITY TO MARK _ -- - _ _` -- _ _ . __ _ __ _ `- " =� ss- � �- - - � x LOCATION IN THE FIELD � � - y - __ _ ° 17+pp - __,� `� � � � � � J �''� ; __ `_ —. -SS ___ ---SS _- 2i+T3b " _ - ---- _ --____ ___ - ��-�_�.._.,,, 20p � _ - -, . 20 00� ___ -_ � � r . -- - _ _ •R- - , 3 ' z g" - - - _ ` - _ _ _ � - - ��i +00._,�` __ __ SS -_-,� � _ ___ _ _ - #� , � - - ,� m _ -� - _ . �--_ ` - -- � 9+0� �'f e}. �.` ,r ` _ -� � -- _ _ _ -- _ _ _ __ __ _ , � _ __ _�° _� W .- _ � ____ _ ___ `• , � . U- ` _ _ ' _ � �. � . r .' - - ✓ " ' z °_ _ _ � � ~ ` - -" _--- -- - _ __ - -- -_ __ ______...____ __ __ _ _ ' ___ ____ ' '� `f _ - '' � � / - ' � _ " � � � __� Q _— y ' - - ' ___ - ----- ---- ---- - - N --- __ � V --- - _:-___ _ ', " Y ' - __ -_" -- - " � _ � -- __ __ _ _ _ _____ ___ _ __ _ __ --- -- - ___ _�_� ' ft5 0 ----- _ - - - _ _ _��� ; _ _ � _ _ - ^ _ _ _ _ __ _ - r __ _ _ _ - - ---------- --- - � -- - ---- _ ._ _ _ - _ _ - - � , _ __ __ _°�V_'_-�- -_ _ _��_� = �' - ----, ~ = _ ^ -- - - -- -- - " � l _ __ _- - - -- — _ __ _ _ -_ ___ _____ ___ _ ____ � ___ - ---- �" ____ __ _ __ ___ ' _ _ N6TE�'fPICAL0I�TA�N6E�- - "- � __ - - - --_-- -�------ ' _ - - - _ - ---_`�--� ". _ ; .. �"_ _ MAtdfitO�K�A�313F�L. _ =�tPCA�T6;_ - - ��___ _ - - � �_ " --- _ _ _ER�10"SS,4IVDNEIAl2�4'-3519�5'-0"--- -- -r -_ __ __�_�__ . --- - - ------ - - _ Y _ "_ �_ � __ - :RE�IulO�!€TF;�S-�4NQ.�• GAINS� _____ - _ OUT$fDE-TOOtrTSfDEj--_ ____ -- ' _ _ _ � ____ _ -_ _ _ _ `_ _ _ -_ - _----_ _ __ ^- `` 'BAldlf'f�EME}tt€ftOGKSAN BRtdiCA8T1 ED _ __ -- _ -- - -. - _ - - _ _ _ ____ __ - - _ _ _ __ __ _ - _ _ _ _ __ __ "=� -- - = � _ __�-LQREl1P.IIN- . ' _`�_ _ -_ _ - - y ------- - _� � ._^ __ - �W __ � - ^� _ _ - - - _ _ _ _ _ -_ � 1 Q0 _ - -, �`- ` ,' . �7:pM ET�ON - �" - _ __ - _- _ V__- J = -- � --- _ _ -- -- __ -- - _ -- __ - � � .. - --- -- ~ - - � � � - _ _.. - - -_ _ _ _ __ __ _ - __ __ _ l , - -_ -- -- -_° - __ --vW- Y-_�`_�ti =_ �.__ � _ - _ �_ `-- °_ ` , _ -' _-_.. - , _��- \ ' -Bf�Ii�GEPt�RB_ �' �� -- _-_ ' "__ - -- - _ _ _ �gp 130 175 00' 2�00 00' AIR RELlEF VALVE Slope = 017 Slope = 005 �/�STA 18+98 125 12S rl MHHUV= 127 57 �EXISTING GRADE v 120 � 720 w v w x ° o 115 a N 1f5 NEW 24" SS (NDPE) O H � �� Q � MLLW = 109 83 = zERO TIDE � ��p W � Z � W � Z z � 105 = Q �� U � a f � �� � 100 0 � O� N V' t0 00 O N V' t0 W O EO c� CO O 47 �[1 1� �O t0 st a Of O , N sF � � tD 1� t0 � lh Of fri O� O O �' 4� O 6p �d� O �CS � N� 47 Of d' !� � � M O C7 QJ � N aD f � N N N [V N N N N [7 M st C7 M N O O Q7 p� N � N � N � � .�- � ^ � � n � � � � � � e- � r N � N .- N � � � � � � � � � � � � O � � � e- � �- r � � � � � � e - W ~ �y,� � W � �yJ � LL � LU � LLJ � LLl � 4.1 � llJ � lJJ � LLl r LL1 � LL �!1J � lL r lL � 6lA � ll.� � tL � LLJ 111 a — — — — — — — — — — — — — — — — — — � 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 � Z � `A y� JoEJ�, � � �� oQ wABy, � x 3 q o o� �� � o ,• r Fl�n eornc CITY OF BREMERTON EASTSIDE BEACN MAIN REPLACEMENT C5 � � lWO1NCHESATFULLSCAlB DBPARTMENT OF PUBLIC WORKS 8 UTILITIES ,,, lPNOT SCALE COR��NGLY ENGINEERING DIV1810N PLAN AND PROFILE M 8 �! �°""�� ts�� HORI2 ,- _ zo• �EaT ,•_ 5. oru.xnNC wo p �� �� �,�,,, �,. �o CHECKED BY WL STATION 76+00 TO STATION 21+00 � 15 � '3 a OATE 3/13 M�ASH P E. 34781 OATE 3j13 WASH P&} 307�9 OAiE 3/t3 a � , ' , � ' ' ' , ' , ' 1 ' ' ' � I J � ' � � � � � � l � \ t \ I � � � I � I t � t AN � PRK \� 1 f PB� � �� ! � f t ER 10 1c I �A�+ J SN \\ � ,� i � � �OX � � � I � �oN� 1 W �� a Y DEBRIS \ l �.3 � ' f � � � 12 � 11 I �p � � � EX 20" SS (AC) f� _ r` '-f- -`� ���' . I � 9 ' 8 � ` .� pe � — _ � -� �20 0�----, ,�, - ' ' �-- — — 1 � �, \ - ' ' -,_ _ �— _�____ — — _ _— __ __-- �. - ,, �, ---a-- -" ' Fj � _ 1 ` .��1_ _ l � � r � — � --- �- ' � � - ' - � _ _ � � �� ` _ �- �- ,` _ __------ _ _ _- ' _ - _ . _ _- `\�' `� ~- P/I � --- {- - -----r� I _ _� --- - -- -� � '7✓-� V _ ` - A �, TTOB''' �` _ ' ' _ ^ - - _ _ _ - - � ,' � ~ � . ��.� µ � --+ — .ss_ _ _ _ _ �." _ `- s�` ��" � ZQ+O�`� � !" �' � _ _ _SS= #14 .., m_..� � � 2 � + y � _ �' S r � SS ' -� - I - ^ �- - - _ _ _ �n _ _ ,�'r -----___ _,...�.�s..... - � 23 �� p —�_��- ' _ �.� _ _ __� ✓�; 17$p�22+00 __ _-__ - _ ___ __ __ -_ ----- - - - ---- __ -----�-,- . 9---.._ , - =2;+60 , - •-_ __ 4 - � _ ---- __ _ _ _ ___ _ ___ __ __ ___ _` _ _-- _4 _ _ _ _^ _ _�_ � __ _ _ ______ __- - �-______ - -- ~� __ ' _ __ ____ _ ~` ' Z zs- _ �__.-- ` �,__ - ___ __- -- _ - ' --_ __ __--_-_ --- ----- � _ � _ __ _ _ _ __ --____ _ NEW24" SS (HDPE) __ _- - ___ _ _ _ �' � -_ " � �" _ __ - ----- - - - - _ � , - _ -- -- - _ _ ____- - - -- - -, _______ _ _ _______ _ _ _ ___ _ - � llQ 0 � ____ ~� N , - J '} ' .. _ "'" � __.__. _ .. .. __ -_ — ' _ -W � �._� _ � _l ' _ '- _ " __ _ ` d �-"'x iv ..--° " � 1100 __ ------- -- -�- - "- _ _ __ _ ___�- _ .. _ - - _ _ � -- _ ' _ __ , _ _ _ � _ -° �� ¢ - � -- - - -- _ __ _ ___ __ y _^ __-_ _ _ __ __ _ - _ ___-__-_ - - - __ _ _ --_ __ _ - " _ � � __ _ - -� - � F � __ __ _ � - ___ OT�. �/PfCAt"bISTAN�� BETWEEN_ _ _ _ _ - - _ - _ _ _ _ _ _ -- _ _ _ _ -- - ` `� _ _ _ _ �_ ___ __ _ . _ _ __ __ _ ___ __ �,.-- 2Q"SS-kbD�R�iM2b°SSIS5'- __ -- -- -- -- --__.-_ __ _ ____ -- _____ - - - _ - -- --- - -- _ _ _____ _ _ - -� _.. - _ _ _ _ _ _ _ _ _ _ 105 0---�_ ° � �` � - _" _ � {flCjTSIDE��O __ _- _ _ __ -- P05 0�_ _ ----- -- _ _ - � �� __ -- -----__- � ° - ' - Y __.�_ __~� - --° -- - y _ _ -`! �~ __�`� � _ -__ _ `_ - _ _ _ _ _ _ - __ _ _ - _ _ � - _ _.. - -- -- - . _-- " _ � �- - - --_ _ -_ _-_ T -_- - _- _ _ - __ ____ __ __ _ ---- _ _ -- __ _ _ _ _ _ __ ___ _ _ _ `-- - _ ° _ `__ _ __ E � _ - - _ " _ __--- __ _ ^- -` -_ ; - _ __ _ _ _ _ _ _ _ _ _--_ ---- __ ___ _ _-_ _ _° __ -~ _ _ ___ _ _°_ _ _ 100 0 _- ; __ -- _ _ " _ -, . - ___� -" " Y . _ ---- - _ --=- 100� ___ _ _ --___ � -m- __ _ __ _ - �_�__�__ _ __ --- _ ___ ----_�_ - -- _ _ � __ __ ' -- __ _ _ _____ 130 f � 700 00' Siope = 0038 125 125 �7 IVIHHW = 121.57 f20 v = v 120 � _ �EXISTING GRADE r 115 b 0 0 115 + w N N Z *. ? 10 W �'� p ML W= 109 83 = ZERO TIDE — � � NEW 24" SS (IiDPE) = � � w Z 105 � -a f05 = U � a � � � �oo �oo 0 � v v �n co �o �p r n n ao rn rn rn rn o c� cv co co cn N . d' Q � t� f � M fV �' pp C � 6� � e0 p 1�' ��O y � tn Q if p c J �(V 1 � � N � f 0 tD � I� � �O �'` �� �� rn rn rn rn o� eo co ao m ao ao ao ao ao ao ao n r� n n. n � � O � O � O � O � O � O � O � O � O r O � O � O � O r O r O � O � O � O r O � O � O � � � � � � � � � � � � � � � � � � �" lU � W � W � W � W � W � W � W � Ul � W � W � tlJ � W � W r W � W ^ W � W T W � W � W � — — — — — — — — — — � — — — — — — — � � 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 � ,��,M ] oy�y d �a �."�a°` 4qsy , REVISIONS o �• Z• F�� � CITY OF BREMERTON �6 � � q No DESCRIPTION oar� er DEPARTMENT OF PUBLIC WORKS S UTILITIES EASTSIDE BEACH MAIN REPLACEMENT SHEET � 1 � TWO INCHES AT FIAL SCALE � w „���� �. IFNOTSCAIEACCORpIN�IY ENGINBERINO DIVISION PLAN AND PROFILE M 9 y �ONaL �5�� SCALE DRAWlN6 NO o �� � .� DESIGN BY WJD CHECKED BY NL STATION 21 t00 TO STATION 26+00 � 15 � � HORIZ f' = 20' vERT 1' � 5 pp7E J/iJ WI�SH P E. f 34791 DATE 3 13 WASN P E � 30J49 DATE 3/13 a � , ' ' ' ' ' , ' ' , ' ' ' � � , a ' � � ' � � � ' � � ' � � � I I I I I G � /' I o � � I I � � i � � � RP �' I I R ,� G �,�� �L � BECAMPg CESS FROM �! I Y GR I I I �R � � �( l/ � �N I � � S �{�piP L � I I O � M� I 50'� C R 0 W L wAy ' � G ONUMENT I I � 11� P � ! E/� E S I I �,� 5 � � I E p S E �,,�N I � S�� M � ( � 4 R� � P P � N P I I 5� R � f � � P n�.� r I � � g R, P g� S K I � ( �� P / � O V � I I I I C p p� C R E� E H E A D W ' I E M E N T O N P R N � � � I ��►PR ( � I I�7H 24'�STORAA OUTFALL � � � pER1Y FOR BEA�H � I I / � � I I 4 ( , 3 I 2 I y � � � 9 9 a cess , 8 � I � 6 � 1 5 � 1 4 � 1 3 � 1 2 '/ 11 I � � s I 5 I I I I � �.. �L— �_t- -- —� 1 7 � � � � � 1 7 Ta I I I _ _ � � roe � T _ _ _� � ° ( � - '�� �- � � — —_ _ — _I � � � / � � — _ _ _ l _ _ _ _ _ _ , � � 1`�� a, - „ - _ _ ' I ,� ` -1 —roe— — — — �� _ _ _ / �( VALVE j , -- '�- - - -�. _ - �� i - - t' i - - - �� _ __ __ i_, i � ? � �, CASELIDS � --�e �_- - _- � � � �- _ - , � - _ - ! ----- i -__ � _ '�,.. � _,, , �� T - i ,__ � _^^^ _ � - - -_ o ._ _ /FORZa°�v�s ---�� __ � � �- - � _ - ` -- - - - - " - � _. , s's ---__�-_ .I __ �� - - � , i � � � ss -�-�- - ss-� -_._...3&-�_ _ _ - _ �.` Sg" r ' B ' , 29+00 � " - - - - — -- - � 30+00 00 ---- _� _ _ _ _ _ _ _ _ _= �r"+a6 _ _ _ _ _ _ sa —=+ - _ _ -~ �.—�--�-, _ � f_ _ _ _ .� � � � 1 - �� I - _ -__ _ _ #�s _ _ _ ___ _ -___ _ -- - - - ----- --- - - �� ` � ` � g _ � , Ex zo°ss�a,c�� - __ -___ ___ t�s o _ . _ _ _ _ _ —. , � _ _ _ \ � __ = _ � ` � $-- ------ ___ ��- --__ r - _-____ __---_ ___ -- - v ,`'� 1/. � � _.. � _ EW24"SS(HDPE) ` - `___ �-- -- ----- _ __°_ _ __ ` � a � J - - _____ _ ..�,/ , �'. '� � __ -____ - , ____ -_ - - N _ - `� tiRE'MQV�"AND REPLACE ROCK ROAD � � ^ `_ _~ -_ ___ __ _-- - - _ � �_ _ - - -- - ___-- -- -°---W-- --- ___ __ ___ - _ - - � Q -- -- - ____ _ _ _� _ --- -- - -- '- - _ � NEED�D�f�PE�2FL�RAA-WORiC' - - - - -- - -- -- -- __ '~- _ -~-__ _ _ _ _ _ ..nl�`�.TYPiCAt fliST $gfiWEEN -- - - - - - ` ` - - _ _ _ _ _ _ 110 0 J _ _ _ _ _ _ _ _ _ � � ' -' - ' - - - ° __ _ _ =�FX�Q".S�RNDNEW-24°SSiS5"-0"'�-___ _ __ __-- -- - ,_ .. __---- _ -_____ __ v ____ - -- - � � -- -(f)t.f�'SfDE-2QQliTSiDEj _- _ � --- --- ---_�___ '- _ - , _ _ _ ' - _ _ _ _ _- _ _ __ _ ___ - -- � _ _ _ _ - J- ` _ __ ____ -� " _ - � _ _ - -_ - -�--- -- �; - ^ __ __ , �_� ___- _�- -- T ------ - - - - -_ __ __ _ _ _ - ` ' ----° _ - -- - ° - -- - �' _ -_ - _ _ __ __ _ - _ - - - - - - -Ei3R CQM1INF�CTtC3�F M1 --------.-._� __ _ _ `� - __ --- - - - ' �� ' . _ - � _ __ - __ - - - - . `" - - - - - - _ 1'IPJG,PfPE, �_ �"" _ - --- ��>;� _- __� �;= T=�� �___ - v - -- l ; - � ` � - 'osa' -- - - _----_ --- _ �__ - .__ -" ---. -- =_� ! --- --, =_ -_~ _---_ - - � ��.' --- -- _ �- _" 130 125 120 715 1f0 105 }pp - � � a� � W 26+00 � N � �W +!9 c� � � � T � � W 26+50 — �oa oo� — Slope = 0038 m N r 0 � tD � O ^ W 27+00 � � � � �W REVISIONS o , r NO DESCRIPTION DATE 8`t �� TYYO IPICHES AT FI/LL 6CALE IF NOT SCALE ACCAROINOLV SCALE FIORIZ. t' � Yp' VERT 1' � 8 —15000' Slope = 014 � u . � �•i� MLLW = 109 $3 = �ERO TID� NEW 24" SS (HDPE) 1+ 1 � f� � !� N � N tV � {T � N n I� t7 Q c0 � N I`� � H � � tf) p � p � p � � � O � t7 � O � O r r ^ r T � � W � W � W � W W � W � W 27+50 28+00 28+50 29+00 fla° �°K CITY OF BREMERTON DEPARTMENT OF PUBLIC WORKS 8 11TILITIES ENGINEERING DIVISION GRArDE —132 OQ - Slope = 17 130 115 120 115 110 w a a o �� z w 100 1` � � p � N �� �� � 1� W �a �o �o �c,o Po '�o 0 � � � W � W ' W W � W � W � � 29+50 30+00 30+50 30+82 NO DRAINN 8Y TH DESIfiN BY WJD CHECKEO 8Y NL _ DATE 3/13 WASN P E / 34791 DATE 3/13 WASH P E � 30749 DATf 3/13 EASTSIDE BEACH MAIN REPLACEMENT PLAN AND PROFILE STATION 26+00 TO STATION 30+82 SHEET �n � 10 ln OF � 15 , ' L� ' ' ' , , �_J ' ' � �. ' ' , ' , ' 1 STOCKPILE SURFACE MA7ERlAl SEPARATELY UP SLOPE pF TRENCH t� ANO REUSE FQR TOP 5 OF TRENCN � RESTORATION 6"M{N MANHOLE OR CATCH BASIN WALL C �/ / � / � 3 GONCRETfi RLUG CONCRETE PLUG �.� �� /�� � e ��%��� j� j MIN ��(ISTING SEWER PIPE EXISTING SEWER PIPE — ��!\�/� i� 'e � � TRENCH BACKFILL SEE NOTES 7 AND 2 °' _ _ _ _ _ _ _ _ _ _ _ _ � � __ — — — � i � ///777 } e 'F -- 5EE NOTE � COMPACTED NATNE SOIL '/ C ` � � • __°_„ _ I —�' y ' REUBE EXISTING 34 MAN 8 � t .� .• • •, a ROCK 70 REPAIR WALL �� �� ORAIN ROCK �� _ � � _ _ _ _ _ � _ — _ _ � _ — — — — N SEWER PIPE in � ° 12 M{N � \ PIPE DIA OR 17 MIN � FILTER FABRIC MIRAFI 78�N a WHICHEVER IS GREATER O}2 APPROVE� EQUAL � Q ESTIMATED MIGH v✓ATER r/ � / MATCH E%ISTING GRADE -� \ CUT PIPE END MANHOLE OR CATCH BASIN � PIPE BEODING SEE NOTE 3 � \\ �CT � 4 IPEDIA+2 � � 3 ROCK WA L STORATION AT +00 1 PIPE TRENCH S C ON TYP vAR PIPE PLUG ETAI S — N Ts AR NTS NTS. NOTES t HDPE COILEd PIPE MAINTAIN POSITNE SLOPE TO AlR RELIEF VALVE ROUTE 11NDER EX 20 AC PIPE AND IIVSIOE 4 DI PIPE �� 2 VERTICAI POS7 SHALL 8E 4 x 4 x 1!4 S7EEL CAST IRpN VAIVE BOX UO CONCRETE COLLAR NATH RAISED TUBE HOT DIP GALVANIZE FPDXY COAT INSIDE SET 2 A80VE GRADE � VALVE BOX PIPE INSTALLATION NOTES ANOOUTPER7172 ENCASEBOTTOM4 WITHi6 Z"A�RRELIEFVALVE � 18 � DIAMETER CONCRETE S�EEVE FOR BAllAST STRAP TO VERTICAL RISER � 1 BACKFILL SHALL BE NATIVE MATERIAL STOCKPILE SURFACE GRAVEL UPSLOPE OF 3 CUT 3 WIDE X 6 LONG OPENING IN FACE OF INISH GRADE TUBING POR ACCESS TO VALVE AN� FRTING5 EXCAVATION STOCKPILE TRENCH BACKFILI DOWNSLOPE FROM EXCAVATION ROUND CORNERS AND SMOOTH ALL SHARP 2 ss coMPRESSioN � � EDGE6 CUT AND SMOOTH OPFJVING PRIOR TO BANOS (TYP OF Z) 2 BRASS GATE VALVE , 2 WHERE NATIVE MATERIAL IS GLACIAL TILL (HARD PAN} IMPORT SAND OR USE STOCKPILED tiD� AND COUPLINGS m ELBOW OUT TO MAKE TRENCH EXCAVATION AS BACKFILL FOR 2' FEET OVER TOP OF PIPE GRADE SURPLUS TILL CONNECTION TO VALVE MATERIAL INTO BEACH PER NOTE 4 ESTIMAIED VOLUME OF TILL MATERIAL = 150 CY ACCESS POR7 MOUNTED ON OU7SIOE HAND TAMP BACKFILL � 1 � SEE NOTE 3 OF TUBE AROUNQ UPPER SECTIpN � � I I �� 3 PIPE BEDDING SHALL BE SELECT MATIVE MATERIAL AS APPROVED BY THE ENGINEER � Casr iRON vuvE Box SURFACE GRAVEL SHALL NOT BE USED AS BEDDING MATERIAL 2 SQ OPERATING NUT � � � TOP SECTION 4 GRADE SURPLUS MATERIAL lNTO THE BEACH TO MAINTAIN A CONSTANT DOWNWAt2D SLOPE a tta oia 1/8 MIN � TOWARDS THE WATER BODY NO LOW SPOTS SHALL BE PERMITTEO IN THE FINAL GRADE THICKNESS I I VP.�VE KEY EXTENSION REQO WHEN VALVE BOX OR C 1 SOlIS DEPTH OF OPERATING NUT IS MORE STD C I VALVE BEACH GRADE PIPE EX7ENSION AS REO D TFVW 4 FEET BELOW FMISH GRAQE 5 DO NOT TRACK OVER PIPE UNTIL FULL DEPTH BACKFILL HAS BEEN PLACED OVER PIPE 80X A65EMBLV 6 Tf2ENCH DEPTH VARIES PER THE PROFILE MINIMUM COVER SHALL BE 4' UNLESS NOTED ����i�; �������\�\ ,� y �/� '- I I �\� � 2 7/4 �NSIDE WfOTH GATE VALVE OTHERWISE ON THE PLANS 7 REFERENCE SECTIONS (7-8, AND 7-17) FOR ADDITIONAL PIPE INSTALI.ATION RE�UIRHMENTS 6 GATE VALVE W/2" NUT � � j `� �� i I 4" HDPE AQAPTER (FL X PE� 4 H�PE 9� DEG BEND (R� VALVE� EXTENSION 2' HOPE 4" MDPE BRANCH SAD�IF (PE) SEE NOTE 5 STEEL VERTICAL POST WITH CONCRETE BASE SE£ NOTE 2 NOTES NEW 24 SEWER MAIN � 2 376 S5 COMPRESSION COUPLING 1 VALVE KEY EXTENS10N5 ARE RE�UIRED WHEN THE VALVE NUT IS MDRE THAN � 4 0 6ELOWFWISHEQGRADE EXTENStONSARET09E AMINIMUMOFONE(1JF00T 4" X 2' HDPE REOUCER (FL X Pt� LONG ONLY ONE IXTENS/ON TO 8E USEp PER VALVE 4" X 8" X 16" CINOER BLOCK 2 VALVE 80X F�CTENSIONS SHALL 8E 5 C 1 50ILS PIPE TYLER TV SEAL a 3 ALL F�(TENSIONS ARE TO BE MADE OF STEEI SIZEO AS NOTED AND PAINTED � WITH 2 COATS OF MEfAL PAINT � � u 15 (lY� °7 � � 4 " AIR SE VALV S5EMBLY �� C S I 0 VALVE OX NTS r VAR N T S w a � A th �OHN ♦ w � O � a e bp4 s By'y REVISIONS o ,- r fiElD 860K CIT`Y' OF BREMERTON �, No DESCRIPTION DATE �Y DEPARTMENT OF PUBLIC WORKS 8 UTILITIES EASTSIDE BEACH MAIN REPLACEMENT 5,�� � TVYO INCNES AT FULL SCALE N a �, a�,�,�o � - �FNOTSCn�nccoao�r�c�v � EN61N88RIMG DIVISION STANDARD DETAILS � 01 � ��«v�u � � � SCALE DRAWlNG NO Q � w � �,� DESIGN BY WJD CHECKED BY NL �„+ �.S � "t.���� � HORVZ N/A VERT N/A DATE J/13 WASH P E p 34791 pATE J/73 WASH P E � 30749 DATE 3/13 s LL ' , ' u , � � ' ' ' , , ' , ' � J ' ' CJ 78 HOPE 90 DEG BENO A Ia �� °� 'I l_ —<� � � 78"X1T REDUCER � EXISTING 12 FLANGED ACCESS PORT '''``^��� CAPPED WITH BIIND FUWGE USE FOR \ 6YPAS5 PiPING CONNECTI6N \ -�----� � � � �--- — — — —� � + M � � TEMPORARY 18" BYPASS PIPING SEE NOTE 2 HDPE PIPE SPOOL lo � A °' °I Q a �—e—�� TEMPORARYCONCRETEEC�LOGY BLOCK STRAPPED TO PIPE TO AVOlD FLOTATION DURING CONSTRUCTION (T'�P) B 18 HDPE 80 DEG BENO � 20"X16 HDPE REDUCER � 20" HDPE 90 DEG BEND F�CISTING 20 GATE VAWE I I EXISTINO 20 90 DEG BEND (FL) CLOSE TO START BYPASS I I� f � I ,� EXISTING 20 GATE VALVE OPEN TO START BYPASS � / FJCISTING 20 HQPE PIPE � I FF I i-H -� � � /' , ,�,,,.�,-�' r '"� � 20' HDPE ELECTROFUSION COUPLING � $ __ __ __ � _ J � _ —�}� � �}— � v �"~ , _ �. _ .._.� _. ....�.; _ _ � � , � — — � i �`, i �i ' � � �— �f F . 1 r ' l� I�ti � i � I � � HDPE PIPE SPtlOI 20 HDPE EIECTROFUSION COUPLING .�.. ! -- � � — � � �— — —�-- --�L `20 HDPEPIPESPOOL � I I `��STINGZO HDPECROSS(FL) t \ 20° HDPE?Z 5 DEG BEND ���-{} --F��I � T � � r �o �� 1 EXISTING 20 HpPE PlPE TO �' o o �,� �(ISTING 4 GATE SEWER PUMP STATlON CE t�'� VALVE FOR AIR RELIEF INWES78REMERTON PIPE PLAN TRANSITIONSTOi6 CI I 20 HDPE 22 5 DEG BIIVD (FUfPE� `� 24 X20 DI ECCCENTRICREDUCER(fL) 1 EAST CONNECTION A D BYPASS DETAIL AT STA 30+82 B MATCH CROWN SCALE 1/2" = i'-0" soo+, fJEW 24" SEWER MPJN 24 HOPE PIPE SPOOL (FUCRE� p� � O y ,�,. 1 w ' �;,� ,/' ��� � 10 0" EXISTW G 12" FLANGED ACCESS PORT CAPPED Wl7H BLIN� FLlWGE USE FOR LINE EXIS7ING 20 AC PIPE I STOP INSTALLATION CUT 2Q AC PIPE PLUG END WITH � � CONCRETE DOWNSiREAM OF ACCESS PORT �— � � � —�=/ — � — �=�� ao � � ` � � \ // � � • � < �---� �—�—�— ;---� `� N N 3 � , z � ' ,,. LL q ' � < � W , w ...,.� :' � � .�.�.._e.., _ �.�. .� - A� 12" 90 DE6 BEND t2" PIPE SPOOL (FL) WfTH 2" THR D NIPPLE AND BRASS BALL BALVE BFACH SURFACE H � � ' 6 � a � NEW 24 SEWER MAIN � s o +i ---�I 24 iiDPE ELECTROFUSION COUPLING � 18 X12 REDUCER /� - � _ \\ \ \\/\ � � / \/ / �� \'/\ ��j / ' LL ��\/�\r�\ �_ 12" KNIFE GATE .'`' / EXISTING 20" AC SEYIfER fiAP.iN SECTION A—A — SCALE 1/2" = 7'-p" � � ��; � 90 DEO BEiJD NOTES 1 TWO 12' FLANGED ACCESS PORTS ARE LOCATED ON TNE EXISTING 20" AC PIPE THESE PORTS WERE TAPPED AND PREVI�USLY USED FOR A LINESTOP/ BYPASS OPERATION IN 2005 AND CONTAIN LINE STOP DlSCS THE LINE PRESSURE AT THIS LOCATION DOES NOT EXCEED 3 PSI DURING DRY WEATHER 2 INSTALL 18" TEMPORARY BYPASS PIPfNG FROM UPSTREAM 12" FLANGED ACCESS PORT TO 20" HDPE FLANGED ELBOW BYPASS PIPING MUST BE FULLY OPERATIONAL BEFORE EXlSTINC'a 20" A C MAIN CAN BE CUT PIPING SHALL BE FULLY RES7RAINED, PRESSURE-RATED FOR 100 PSI MIN , AND TIED DOWN TO PREVENT FLOTATION $Y TIDE PIPE MATERIAL MAY BE HDPE, DUCTILE IRON OR AWWA C9D5 REFERENCE SECTION 7-17 3(1) FOR MORE DESCRIPTIVE REQUiREMENTS ASSQCIATEO WITH THE TEMPORARY BYPASS SYSTEM INCLUDING VVORK SEQUENCE 3 PR(OR TO CUTTING AND WELDING HDPE FITTINGS EXPOSE EXISTING PIPE AND OBTAIN MEASUREMENTS Tp MAKE CONNECTION 4 INSTALL LINE STOP ASSEMBLY AT OOWNSTREAM EX 12' FLANGED ACCESS PORT INSERT LINE STOP WHEN REQUIRED TO STOP AND DIVER7 FLOW THROUGH THE TEMPORARY BYPASS PIPING PROTECT LINE STOP ASSEMBLY AND CONNECTION AT ALL TIMES 5 TO PREVENT THERMAI.. EXPANSION OF THE HDPE PIPE, KEEP SURIED AND SHADE PIPE IF MORE THAN 15' EXPOSED TO DIRECT SUNLIGHT 6 MAKING THE CONNECTION WILL REQUIRE CU'iTiNG THE 20" AC PIPE REFERENCE SECTION 1-07 29 FOR CUTTING AND HANDLING OF AC PIPE I � �/� � / � 7 i � EXISTING 20 GATE VALVE � / FJfISTING 20" H�PE 90 6 / �/ / BEND (Fl) WI BLIND FLIU / / � � / REMOVE BLIND FLANGE � �l INSTALL BYPASS SYSTE � r AND REINSTALLFLANGE I \ r ----� .� --j'� i� �/ AFTERREMOVINGSYST in , n� �� � ii ii in � �/ ��,� . ` " --�---------in iii --' — i � � i III� III f �// I � � I I I.� I I I \ �y 11 11 I II I I I �� ���' ��,------ ----� � Z �EXISTING20 CROSS �31 SECTiON 8—B SCAIE 7/2" a i'-0° i �'� � �+��~ ' , ' 1 ' LJ � � ' ' ' ' ' ' ' ' � �J ' INSTALL LINE STOP � ASSEMBLV REMOVE AFTER AC PIPE IS CAPPEO REMOVE EXISTING � / w � _ � 12 BLIND FWJGE TO I B INSTALL LINE STOP , EXI5TING CYCLOtJ6 fENCE � I EXIS71NG CYCIANE FENCE i � �_ .� ; EXISTING 12" DI RISER FL ! I I A 3f- — X `--- � --{ �}- I — -� '- X— — -c GATE /� I � I 24 IdNG ( ) - — -3E — -1 -- 3E-I- — --iC — —YE- — -"X-c'.' GATE 3F - j I � 2-8 X2-fi XS-0 I �I � I I � / � , � � CONCRETE BLOCK � E I � � _ , I i I �- � I I ----. -� �I�� �Exzo ac 10 I � ° „-- � li� �--�-- �� I � LL � � EXISTING 20° C I SEWER MAM � �� _�_ ;� � PROTECT EXISTING ( � �� - 20" C I STORM MAIN I I I EXISTING 20 C 1 SEWER MFUN PLUG AT � ,---'- � - � �� I \ � � � UPSTREAM MH TO STOP FLOW � I I � I I I , 4- _�__ 1__� � I � �( I � LINE STOP � 4 � -pROTECT EXISTING 20 GATE VAl.VE UNRESTRAlNED) € ' I EXISTING 20" GATE VALVE (MJ) - �'i ` € WiTH MJ CAP NSTA L TRAN TION COUPUNG (AC TO OI) � EXISTING 20 D I PIPE �� DEMO AND REMOVE EXISTING 20 HDPE I / � BEND AND CONCRETE ENCA6EMENT 5 I N STO P& C D TAI L EXISTING 20 C I � DEMO AND REMOVE SECTtON OF �-� � S70RM MAIN I �. � DCISTING 20" AC AS NEEDED TO MAKE ! _ 12 DIA VERTICAL FtANGED - N T S � ROOM FOR NEW PIPE. 1 � ACCESS PORT USE FOR � ^ SEE SEC 1 O7 29 FOR AC /'VERTICAL FtANGED l � LINE STOP INSERTtON '� � DISPOSAL RE�UIREMENTS J / ACCESS PORT � I ! __,e= � � Y / ABOVE ROCK WALL 1 v � \� - -� - 1 - - - - -'_� �� � � =.,�__-___ - �'1 L� ___ �-ti� _--_ � Y � ��d i` �7�7�:fG��i���.��r�� � �i�i�/f�/��� ���_'_' L � --- -" �� J I � 24 5 SEGMENTED HDPE 90 OEG BEND (FL) � � � VERTICAI FLANGE ACCESS FOR LINE STOP � `EXISTING 20 AC ( ,,,///��� EXISTING ROCK WALL //`� ` / ` , INSERTION SEEOETAILSASOVE EX1S7lNG ROCK WALL �� � � SEWER MAIN � - ' _ ` / r \ ' /, �\� /� J � CUT EXISTING AC PIPE LFAVING ROOM / l - - _.j� ^ - --e - ! � --\ --� � � ��i' \/ - '\ l� \ '� �� � � � �` �/ i J �J i/ ( FOR SPOOL A ND CAP SEE DETAiL 5 ABOVE /, "_ \ �_ J,1 �..�. `, �--� , � -��_�� � ��-����.�-�/�--..,�//1 ��/ ��_ ���__i`�_ � �_ � ��_� ��'�--�,`--�\--�1'� ��`�� � �� `I _�\� I �� _.i /\�__��_._J��._���-�� I �_ _i ��-� - -"' A NOTE REFERENCESECTION7/73(3)FORDESCRIPTION - ' r � 2 NEW IPING PLAN OF WORK AND CONSTRUCTION SE�UENCE TO MAKE a < � CONNECTION AT THIS LOCATION o l�� y SCALE 1/4 = 1�-0� 24" HDPE PiPE � p .�...,.- _ �. ._� - , o � � �' .. ... .. - . ..., ..� .- .,__ ,...,.,.,,. ..... ,._».-..�.... ..... ...4 l � � 1 EXISTING DEMOUTION P - �""�'�""`" — scn� t/a° = i -o° � B --ff" �,�,r I I II i ! �EXISTINGCYCLONEFENCE i � � EXISTiNG CYCLONE FENCE � � - �� f 11 _ � � r RESTORE EJCISTING EMBANKMENT ,�f�?� � � WITH RIR RAP TO MATCH EXISTING �"" � r �/ I I ...� �t r — _ _ T��������_ _ u r �u i � 17 EXCAVATE EXISTING EMBANKMENT TO EXPOSE VALVE AND PIPING t8" D I BLIND FUWGE ` ' I+ � ,� �, � �� � ex�stir�c avc va�ve cnri R£MOVE SECTIONS OF F>CISTING �� � � 18 C905 PIPE SPOOL (FLXP� � � ~ / � � f � � � EXISTING PVC VAWE CAN �� EXISTING 20" C I STORM MPJN ROCK WALL AS RE�UIRED FOR y /� 1 4 IMPROVEMENTS , 111/ ifl DI 1ty.DEG BEND{R)� � � � � � �� �� � EXISTING 20 C i STORM M/UN �, � �� � I � � / RESTORE EXISTING ROCK WALL � YF , � � ��� �. n � 1 � '' UPON COMPLETION OF WORK ��\�,,,� � � �,�� ` � � � 'J 24 C905 PIPE SPOOL (CUT TO Fin � � °` � f � D4 ENd (M.� �` �/ � � �STING 20`C I SEWER MAIN � 4 � �� � ��...� ' ��� ' - � � `� �., ��/ __— -- __�--E-- � � 1 �' �! ` _ 24" C905 PIPE SPOOL \ � �`( � ' - _ - --- �^� - _ - ' - -J a / ./�� - - - - - - ° ' y,._.-, _ _ - - w � - _ _ � \ � � - � 1 �_ � � ,�- � - - - - - � -._ - - - -�""�- - � 24� NDPE 5 SEGMENT - � ` I � � i�r--''--+b J = � � � 6� � ._--- - '�`- _ � ... - - - -' 90 OEG BEND (Fy � / � 1 � � F . -- � -- - � � _ , � - - -'"' � - r , '' �-er" � ` 2tl C905 PIPE SPOOL (CUT TO FIT) 1 � � _ _ _ - -� - - v.�7�j,� j �j4�h.•`,� .. r� O 'r,_ � � za x 20 D i REUUCEEt (MJ} � -a � - � � EXISTING 26 C 1 SEVJER M1AAIN � �`y` � ,�,�� � I �� �- 24 C905 PlPE SFOOL(CUT TO Ffn � yTO �p�ytF EXISTING 20 GATE VALVE g(o� O�T '� 24 X 16 D I WYE (fL) y � �/ a' � 24" 0 I S011O SIEEVE (M.� � ��� � 36 D i PIPE SLFF/E J SEC IO A� TOPRO7ECTHOPE 4 SECTION B v (CUT TO Fln �+ SCALE i/4" = 1'-0 SCALE 1/4' = t'-0` � ��, JoHN "� oP � e`gy' d y` � �!� k, .� FELD BQOK CITY OF BREMERTON �� s � REVISIONS � +' z - No OESCRIPTiON OATE eY EASTSIDE BEACH MAIN REPLACEMENT SHEET � QEPARTMENT OF PUBLIC WORKS 8 UTILITIES u� W 4 � 7WOINCHESATFULLSCALE ENGINEBRING DIVISION WEST CONNECTION AT STIiT10N 1+00 M 13 a ���go `� - tF NOT SCAIE 0.CCORDINGLY �are [S I�,�� � SCALE oruwac No � o � DRAWN BY TH tlESiGN 6Y WJD CNECKED BY NL � �' � HORIZ N/A VERT N/A OATE 3/73 WASH P E # 34797 DATE 3j13 WASH P E � 30749 DATE 3/73 LL 1 ' ' C l ' , I 1 � Lc� ' ' ' ' ' ' ' ' , � �J �� _� �� o p EXISTING GRADE .---� � LL q � � EXISTING GRADE � �O � � a 14" 22 72 DEG OI BEND {M,Q �� � ��� �\/�i �\ � ' – '- � \ \�� �\// �\ i _ �– i – – – – ( � \f � – – _ �EXISTING 14 PIPE / � � .- - -- – � S � � L � � 14" D I SOUD SIEEVE (M.� � 1 � �r - J_ – – – �" I '"" � ` '� EXiS71NG 8 C! PIpE � � / � � � r 14" C905 PIPE � r / ��/ 8 C900 PIPE , - � , I `,/ i 8 C900 PIPE – – – – – – – – – 14" C905 PIPE __ ^ i � _ : IE --- i � — - — � °' 8" C900 PIPE 14° C905 PIPE i 4 SECT 0 B—B SECTION A—A � sca� a/s` _�—o• VAR �ALE 3/8' = t'-0" A B . �� � c � � i i / j� EXISTING 8" C I PIPE � / �Q � �-EXISTING 14 C I PIPE G� , �� 0 4 �� � 14" D I SOUD SLEEVE (M,� 1 j 3 � 8" D 1 SOLID SLEEVE � 7 3� 5 � 14" 22� D�G D I BEND (M.� I CUT � t� � � 8 2 2 J� D E G D I B E N D ( M.� -� � �� J��� ,/-t4 C805PIPE �'` j � G S t �'� � ✓J � o a O � C lry. P IN3TAlL 10" D I CAP (M.Q I /� ! 2 p c.t �14 22}4 DEG D 1 BEND (M.Q �� ��� ,// �-INSTALLB CAP(M.Q U y / ` EXISTING 20" X 10" WYE 14" GATE VALVE (M.� f �� � � 1� �� 8" 22 J4 DEG D i BEND (M.n � f ---` �ISTING 20" AC PIPE EJ(ISTING 20" AC PIPE / � / � / � 14 C905 SPOOI (P� EXISTING 20 AC PIPE EXISTING 20" AC PIPE �� �--_____–__–�_�����_.�–_____–_�_ ____��---------------- �–__ – _ – – _ _ _ –� _� III IEI ' � — 1 �----__ __ __—__���.....,� ��� __�__—__ --________� � ! l ) — — — — I I I II I ' — � — — — — —�� —r�— — — -- — — — — — — — -- � I#f _ II ` i �-------- — � 3 - - 1 � � � � ' ���V' / �I�/ �II — �� ----1�------- -------------------------- --------- --- ---- -- �gi±~�—Fl� ---------------� 24" X t4 0 I RED {FLXM,n DEMOIISH SECTION OF 20"AC DEMOLISH SECTION OF 20" AC � PIPE TO PERFORM WORK PIPE TO PERFORM WORK ' EXISTING 20 X 8 TEE 24 HDPE" TEE (FL) � ONLY AS NEEDED ONLY AS NEEDEO 8 C 900 PIPE N � 24" X B HDPE TEE (FL) -� I 8 GATE VALVE (R X M,I) � 24 NDPE EF COUPLING � 24 H�PE EF COUPLING 24" HOPE PIPE � 24" HOPE EF COUPI.WG � � 24" HDPE EF COUPLING 24" MDPE PIPE . � i .� � . " , . , , , . . ,� i � � 'i y �- ✓� <5 f � t y a ... .... ... r ... � .wr �+ � � c.r ............ .... ,. � -. .. i� .r......., ww > � � � � t � l l f � " � .,... .... .... w... ........... ..... ....�,.......-... -, t l ^, y f ^^.. t ` / � i _ < .. . a " � Y M i� f ...i....v.+e. +v.v.we. # a...a.,.mw� uvmr+a.... A B � SIDE SEWER CONNECTION � S E SEWE CONNEC � U AT STA 5+35 — q � U T STA 13+87 � SCALE 3/B" = 1'-0" N SCALE 3/8" = 1'-0 N W � � ¢ NOTES Z NOTE9 � t STATlON LOCATION SHOWN IS APpROXIMATE POTHOIE TO LOCATE AND EJ�DSE THE EXISTWG 1 STATlON IOCATION SHONM IS APPROXIMATE POTHOLE TO IOCATE AND EXPOSE THE EXISTING � WYE AND UPSTREAM PIPING IN ACCORpANCE WITH SECTION 7A8 TO OBTAIN LAYOUT TEE AND UPSTREAM PIPING IN ACCORDANCE WITii SECTION 7 OB TO OBTFJN LAYOUT � MEASVREMENTSAND DEPTM PRIOR TO THE WORK MEASUREMENTS AND DEPTH PRIOR TO THE WORK 2 REFERENCE SECTION 7 17 3(4) FOR DESCRIPTION OF WORK AND SEOUENCE TO MAKE 2 REFERENCE SECTION 7-17 3(5) FOR �ESCRIPTION OF Y4DRK AND SEQUENCE TO MAKE � CONNECTION AT THIS IACATION CONNECTION AT THIS LOCATION � 3 WHERE AC PiPE IS CUT AND REMOVED TO MAK6 SPACE FOR NEW PIPE, MANDLE AN� DIPOSE OF 3 WHERE AC PIPE IS CUT AND REMOVED TO MAKE SPACE FOR NEW PIPE, MANDLE AN� DIPOSE OF IN ACCORDANCE WITH 1-0729 IN ACCORDANCE WtTH 1 0729 q N U P � JOqN 3`mFQ,o e�sp� � a REVISIONS o � r �E�o B°°K CITY OF BREMERTON D4 � - No DESCRtPTaON onre er �--�� DEPARTMENT OF PUBLIC WORKS 8 UTILITIES _ � EASTSIDE BEACH MAIN REPLACEMENT 5HEt1' � R ��� � � 1WOINGHESATFULLSCALE t n W ��Q/AL IFNOTSCALEACCORDINGIY ENGIN�ERING DIVISION M 14 � SIDE SEWER CONNECTIONS �S ��3 SCALE ow+wiroc r,o � � � ORAWN 8Y TN DESIGN BY WJD CNECKEO BY NL F- � HORIZ N/A VER7 N/A OATE 3/f3 WASH P E// 3479i DATE 3/13 WASN P E � 30749 �ATE 3/t3 g 1 5 � LL 1 ///��� SECURITY WIRE AND CONNECTORS � TO MATCH MATCN EXISTING FENCE ' ^ i ' ' f NEW 6 HIGH CYCLONE FENCE / / ' / � WITH SECURITY WIREANO � v REQUIREO HADWARE ' � � � � 1 ----------- -----------------'--------- Sq �EXISTING WALL� �� wcur �ay� R ' /\// � \ �\��/��\\ / �/.Y�i� • � FlNISHED GRADE � WALL ��� Wq f OUTSIDE OF FENCE AREA � � � S� �� NOTE � �\j �\\/�/\//\%i�� � ' t AFTER SAWCUZTISJG WALL GRiND DOWN ALL SHARP EDGES MfNIMUM Ya" GR1ND ALL I E%PtlSED STRUCTURAL STEEL GROUT AND SACK �tOOTH WITH APPROVED NON SHRINK GROU7 2 SEE NOTES ON SHEET C1 POR AOORIONAL INFORMATION ON FENCE CONSTRUCTION ' 3 ALl IRON AND STEEL MATERIALS THAT ARE PART OF THE NEW FENCEIGATE SNALL BE HOT OIP GAIVANIZED , ' 1 13 i+ -- --- 2y — _ ' � � IE 732 T EXISTING 8" CONCRETE – — ' RETAINING WALL EXISTING 12 �HICK WALI DEMOUSIi AT ROAD RIP RAP � 2 1 SLOPE FER //� BRILK PAVERS WALL SECTION THIS 3HEET / 5 � Sl-�� 6" THiCK CSTC ROCK � F�C GRO NDTO COMPACTEDlNPLACE J, /f\J` �I `` /�,�tijf ~ �� ' 2 ��� _fE 7295 -� r" �,` , �� J/%�!I i G'/��%�N/j�� TR/WSITtONfROMHAIIAST ' i fl��..�:� �.\ �\ � . . i �f.��� TO PAVERS � WALL SEE DE7AfL SHEETCt ELEVATION VARIES SAW CUT WALL 12" ' BELOW EX GRADE 1 � ��. _ �i_ �9 ' �P�"' O ' � y � 9° REVISIONS o r r r���o eooK ��`' /� O DESCRIPT'ON DATE BY � Y TWOINGMESATFULLSCALE � � – fF NOT SCALE ACCORDiN6lY 74 WIDEDOUBLEGATE � LOCKABLE DOUBLE GATE DROP BAR LATCH ASSEMBLV Ff OF NEW 6 HIGH � " � i2 oia x e o�a cor�cR� MATCH TOP OF WITH t'fi SCH 0 40 PIPE SL FFVc EXhS71NG ASPHALT (IATCH RECENER) �� � a ���777 RIP RAP O R HEAVT FIITER � T � BEACH ACCESS ROAD � 5 1 SLOPE '/ FABRIC �� 1 Slp£ SLOPE (lYP) � b BRICK PAVERS / p 1 `� ° 6"lNICKCSTC � ZG�� COMPACTED M PLACE SP�,iGU � , �(REF SECT ON 4 pq�TER FABRIC I � _�f„�` � BETWEEN FAVERS AND CSTC � � 6 — g ________________________°I.I. _____—_____---° I I �� � � I � I I � i If � k6 � �c -------- �_ -------- _� -- �" -- �� ------------ ----- ------- -------- ----- �----------------- � I � �=__= _ _�________________��______________-__ � , - - � ii i , �� � � � �------------------------- -- � -------------------------------------- m // 3 �EXISTING WALL' / � � MATCii EXISnNG StAPE 0 � IA�I�SECTION G scn�, ��2• � i�-o� - +y 12 EXISTING ASPHALT PAVEMEM e TH'CKPERMEABLEHAW�Sr FENCE eo AS REOUIRm — PLASTIC IiNER r SEE NOTE 2. 0 � TEMPORARY J T' POND - •'J SAN� 9AG PERIMETER � PUMP SEE NOTE t EXTEND OlSCHARGE HOSE � ACROSSOPENTRENCM , .�/l //��l%'/ � . EXCAVATE TEMPORARV POND TO COLLECT DISCHAR6E FROM TA" STORM OUTFHLL SEE NOTE 1 NOTES 1 OETERMINE SIZE OF TEMPDRARY POND AND PUMPlNG EQUIPMENT TO CONTROI RUNOFF FROM OUTFALL AND DIVERT FIOW PAST PIPE TRENCH 2 PONO IINER SMALL BE SINGLE CONTINUOUS PtECE OF HEAVY MIL PLASTIC WITH NO LAPPING JOINTS 3 BACKF�LL POND AND RESTORE TO E7CISTING CONDlTION UPAN COMPI.ETfON OF NEW PIPE WORK IN TF� ARFA �__T_�P�RARY DIVERSION PQND Q sca.� +�z � r-�r '�" �` sca�e ' � + ORAWING NO DRAWN BY TH 7 I��� HORIZ N/A VERT N/A DATE 3/13 6 CITY OF BREMERTON DEPARTMENT OF PUBLIC WORKS 8 llTILITIES EN6INE�RfNG D1dIS10N DESIGN 8Y WJD CHECKED 8Y NL WASH P E !! 34791 pATE 3/t3 WASH P E � 30749 DATE EXISTiNG 24 CMP STORM OUTFhLI PIPING �..�. ...__ �� EASTSIDE BEACN MAIN REPLACEMENT WEST END ACCESS pCCES3 ROAD DETAILS SHEET M 15 � � J