Loading...
HomeMy WebLinkAbout05/08/2013 AGENDA CITY COUNCIL 345 6th Street, Suite 600, Bremerton, WA 98337 ❑ Phone (360) 473 -5280 ** *AMENDED * ** MAY 8, 2013 CITY COUNCIL STUDY SESSION 5:00 PM in COUNCIL CONFERENCE ROOM 603 The Study Session is open to the public but there will be no opportunities for input or participation; no action is anticipated during the Study Session; and the content of these items is subject to change. If approved by Council, the items will be placed on the May 15, 2013 Council Meeting Agenda: A. INFORMATION ITEM -Briefing on new Armed Forces Day Parade Route B. NO PRESENTATION PLANNED - The following items are budgeted items or have already been reviewed by the appropriate Council Committee. 1. Renewal of Pollution Liability Insurance with Illinois Union Insurance for 2013 — 2016 2. Renewal of Service Contract with Bank of America for Banking Services 3. Extension of Interlocal Agreement with Kitsap County Administration Services for Court Security Services 4. Contract Award to JCI Jones Chemicals, Inc. for the purchase of 12.5% Bulk Sodium Hypochlorite Solution for the Westside Wastewater Treatment Plant 5. Contract Award to Stripe Rite Inc. for Installation of Hot - Applied Street Traffic Markings 6. Professional Services Agreement with Parametrix, Inc. for Consultant Services for the Washington Avenue Sewer Improvement Project 7. Schedule 74 Conversion Construction Agreement with Puget Sound Energy in conjunction with the Pacific Avenue — 6 th to 11 th Street Project C. FULL PRESENTATION ITEMS 8. Contract Award for Construction of the Pacific Avenue — 6 th to 11 th Street Project 9. Review of Proposed Capital Improvement Plan (CIP) for the period 2014 through 2019 D. GENERAL COUNCIL BUSINESS 1. (Report will be presented May 22) 2. Other General Council Business (As necessary...) E. ADJOURNMENT OF STUDY SESSION Americans with Disabilities Act accommodations provided upon request. Those requiring special accommodations should contact the City Clerk's Office at (360) 473 -5323 by noon on the Monday preceding the Council meeting. AGENDA BILL CITY OF BREMERTON CITY COUNCIL ......................................................... ............................... SUBJECT Review of proposed Capital Study Session Date May 8, 2013 Improvement Plan (CIP) for the period COUNCIL MEETING Date I NIA spanning 2014 thru 2019 Department Financial Services Presenter Becky Hasart Phone 473 -5722 SUMMARY Each year staff updates the six -year Capital Improvement Plan with recommended capital improvement projects and equipment purchases CIP projects and budget appropriations are adopted annually as part of the normal budget process This year, the City is moving toward a more traditional budget development timeframe by presenting the proposed CIP during May This also allows Council additional time for consideration of the list and proposed priority ranking Projects for 2014 are ranked in priority order and, if affirmed by Council, the priority ranking will be used to determine which projects will be given consideration as funding is identified during the revenue projection process in June ATTACHMENTS CIP Citywide Summary, Project Listing by Fund and ER &R Vehicle Replacement List FISCAL IMPACTS (Include Budgeted Amount) Will be determined as part of the 2014 budget process STUDY SESSION AGENDA ❑ No Presentation ® Full Presentation STUDY SESSION ACTION ❑ Consent Agenda ❑ General Business ❑ Public Hearing RECOMMENDED MOTION None at this time This item is being presented for consideration and affirmation of priority rankings COUNCIL ACTION ❑ Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action Form Updated 01/25/13 Citywide Summary Classification All 5/1/2013 Sum of Amount Year Fund Department 2014 2015 2016 2017 2018 2019 Grand Total General Fund Fire 87,652 590,000 1,100,000 950,000 2,727,652 General Facilities 119,000 70,000 30,000 15,000 234,000 Arterial Streets 150,000 150,000 Streets 625,000 8,660,000 9,030,000 6,880,000 10,430,000 11,070,000 46,695,000 Parking Operating 35,000 15,000 75,000 125,000 Police Special Projects 50,000 50,000 50,000 50,000 50,000 50,000 300,000 MAT 46,000 46,000 30,000 20,000 25,000 25,000 192,000 1 % for Arts 10,000 10,000 10,000 10,000 40,000 Park Facilities 250,000 478,350 2,135,000 823,900 305,000 1 3,992,250 Evergreen Park Remediation 36,500 36,500 53,500 50,000 176,500 Lower Wheaton Way 1,591,015 1,591,015 Equip Rent & Res 515,000 1,850,100 1,827,654 1,321,780 2,352,008 1,131,898 8,998,440 Information Tech 25,000 30,000 55,000 Storm Capital 770,000 1,870,000 370,000 470,000 620,000 1,020,000 5,120,000 Waste Capital 6,220,000 4,720,000 5,520,000 11,020,000 4,136,000 4,436,000 36,052,000 Water Capital 2,883,000 2,443,000 3,323,000 2,528,000 2,645,000 2,375,000 16,197,000 I Grand Total 113,378,167 20,828,950 23,549,154 24,153,680 20,618,008 20,117,898 122,645,857 Department Project Title Rank 2014 2015 2016 2017 2018 2019 Grand Total 1% for Arts Public Art Work 10,000 10,000 10,000 10,000 40,000 1% for Arts Sum - - 10,000 10,000 10,000 10,000 40,000 Arterial Streets Pacific Avenue Improvements - 6th St to 11th St 1 150,000 150,000 Arterial Streets Sum 150,000 - - - - - 150,000 BKAT BKAT Production Equipment Upgrades 1 46,000 46,000 30,000 20,000 25,000 25,000 192,000 BKAT Sum 46,000 46,000 30,000 20,000 25,000 25,000 192,000 Equip Rental & Res Replacement of City Vehicles & Equipment 1 515,000 1,850,100 1,827,654 1,321,780 2,352,008 1,131,898 8,998,440 Equip Rental & Res Sum 515,000 1,850,100 1,827,654 1,321,780 2,352,008 1,131,898 8,998,440 Evergreen Park Remedi Remediation Monitoring 1 36,500 36,500 53,500 50,000 176,500 Evergreen Park Remediation Sum 36,500 36,500 53,500 50,000 - - 176,500 Fire Thermal Imaging Cameras 1 30,945 30,945 Breathing Air Compressors 2 45,000 45,000 Bunker Gear Dryers 3 11,707 11,707 Architectural Study for Fire Station Improvements 40,000 40,000 Controlled Intersection of Sylvan /Sheridan & Olympus 200,000 200,000 Electronic Sign for Station #1 50,000 50,000 Fire Engine Replacement 550,000 550,000 550,000 1,650,000 Remodel Fire Station #2 350,000 350,000 Remodel Fire Station #3 350,000 350,000 Fire Sum 87,652 590,000 1,100,000 950,000 - - 2,727,652 General Facilities Court Elevator Security Cameras 1 11,000 11,000 Library Security Camera System 2 12,000 12,000 Naval Museum Emergency Exit 3 11,000 11,000 Court Facility - Sidewalk and Curb /Gutter Replacement 4 10,000 10,000 Mobile Sweeper 5 20,000 20,000 Equip Services - HVAC Upgrade 6 10,000 10,000 Old Cencom Building - Replace Leaking Roof 7 35,000 35,000 Fire Station #3, 3031 Olympus Dr , Custom Cabinetry 8 10,000 10,000 Equip Services, 100 Oyster Bay - Enclose Work Bay 70,000 70,000 • Major maintenance Department Project Title Rank 2014 2015 2016 2017 2018 2019 Grand Total Library 5th St Planter Lighting 15,000 15,000 Library 5th St Water Fixtures 30,000 30,000 General Facilities Sum 119,000 70,000 - 30,000 15,000 - 234,000 Information Tech Storage Array Upgrade 25,000 30,000 55,000 Information Tech Sum - - 25,000 - 30,000 - 55,000 Lower Wheaton Way Lower Wheaton Way 1 1,591,015 1,591,015 Lower Wheaton Way Sum 1,591,015 - - - - - 1,591,015 Parking Operations Parking Facility, 405 Washington Ave, Guard Rails 1 15,000 15,001 Harborside Parking Security Camera System 2 20,000 20,002 Parking Lots, 796 Burwell, 8014th St and 507 Park - Parking Lot Lighting 75,000 75,000 Parking Lots, 796 Burwell, 8014th St and 507 Park - Parking Lot Signs 15,000 15,000 Parking Operations Sum 35,000 15,000 75,000 - - - 125,003 Parks Capital Pool Filtration and Chemical Feed System Upgrades 1 250,000 250,000 Anderson Cove Waterfront Park Development 172,000 172,000 Evergreen Park - Chevron Property Improvements 40,000 40,000 Evergreen Park Accessible Play Project 261,350 261,350 Forest Ridge Playground Improvements 55,000 55,000 Lions Park - Dock Renovation 120,000 120,000 Maintenance Facility Relocation 373,900 373,900 N A D Park Safety Improvements 250,000 250,000 Neighborhood Park Expansion 250,000 250,000 Off -Leash Dog Park Project 45,000 45,000 Pendergast Soccer Field Artificial Turf 1,350,000 1,350,000 Pendergast Soccer Field Restroom 200,000 200,000 Sheridan Park Community Center Energy Efficiency 175,000 175,000 Warren Avenue Playfield Renovation 450,000 450,000 Parks Capital Sum 250,000 478 2,135,000 823,900 305,000 - 3 Mayor maintenance Department Project Title Rank 2014 2015 2016 2017 2018 2019 Grand Total Police Special Projects Machinery & Equipment 1 10,000 10,000 10,000 10,000 10,000 10,000 60,000 SOG Vehicles 2 40,000 40,000 40,000 40,000 40,000 40,000 240,000 Police Special Projects Sum 50,000 50,000 50,000 50,000 50,000 50,000 300,000 Storm Capital City Culverts 1 50,000 50,000 50,000 50,000 50,000 50,000 300,000 Collection Systems 2 50,000 50,000 50,000 50,000 50,000 50,000 300,000 Storm Drainage Replacement Program 3 120,000 120,000 120,000 120,000 120,000 120,000 720,000 Kitsap Way Culverts 4 75,000 450,000 525,000 Eagle Ave Storm Drain 5 75,000 500,000 575,000 Eastpark Stormwater Outfall 6 300,000 550,000 850,000 11th St PI & Washington Outfall 7 100,000 150,000 250,000 Brentwood Dr & Oyster Bay Culvert 250,000 250,000 Marine Drive & Kelly Road Storm System 50,000 250,000 300,000 Price Road Conveyance Replacement 100,000 100,000 Westpark Oyster Bay Outfall at OB -1 150,000 800,000 950,000 Storm Capital Sum 770,000 1,870,000 370,000 470,000 620,000 1,020,000 5,120,000 Streets Pavement Preservation - TBD 1 500,000 500,000 Sidewalk Improvements 2 25,000 250,000 500,000 250,000 500,000 250,000 1,775,000 Washington Ave Project 3 100,000 1,550,000 1,650,000 4th Street Landscaping Replacement 150,000 150,000 Access Ways in Dockside 20,000 20,000 Armin Jahr Elementary Safe Routes to Schools 400,000 400,000 Arsenal Way /Patton Ave Safety Improvements 100,000 100,000 Arterial Streets Major Maintenance & Reconstruction 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 11,000,000 Bremerton HWY Safety Improvements 120,000 600,000 720,000 Gorst Sinclair Trail 100,000 100,000 Harrison District Traffic Circulation Improvements 10,000 10,000 Kitsap Way to Harlow Drive Intersection 40,000 40,000 Local Street Major Maintenance & Reconstruction 3,500,000 3,500,000 3,500,000 3,500,000 3,500,000 17,500,000 Marine Drive NMT Improvements 100,000 100,000 Major maintenance Department Project Title Rank 2014 2015 2016 2017 2018 2019 Grand Total Naval Ave Road Diet 50,000 50,000 Oyster Bay Ave Improvements 300,000 300,000 Shore Drive Shared Use Path 40,000 40,000 Signal System Upgrades 200,000 200,000 200,000 200,000 200,000 1,000,000 SR 303 Corridor Improvements - Burwell to Riddell 250,000 2,000,000 700,000 4,000,000 1,000,000 7,950,000 Street Lighting on Pine Road 100,000 100,000 Street Lighting on Ricky Road 40,000 40,000 Traffic Calming 30,000 30,000 30,000 30,000 30,000 150,000 Werner Road Widening & Signal Improvements 3,000,000 3,000,000 Streets Sum 625,000 8,660,000 9,030,000 6,880,000 10,430,000 11,070,000 46,695,000 Waste Capital Machinery/Equipment - Utility Operations Manager* 1 20,000 20,000 20,000 20,000 20,000 20,000 120,000 WWTP and Pump Station Improvement Program 2 350,000 350,000 700,000 700,000 700,000 700,000 3,500,000 Metering System Upgrade* 3 250,000 250,000 250,000 250,000 216,000 216,000 1,432,000 Digester Heat Exchanger #1 & #2 Replacement 4 100,000 100,000 Blofilter Upgrade 5 1,200,000 1,200,000 Substandard Main Replacement Program 6 350,000 350,000 350,000 350,000 350,000 350,000 2,100,000 CIPP Repair of Fading Sewers 7 75,000 525,000 600,000 Replace CW2 Pumps 8 250,000 250,000 Metal Storage Warehouse 9 50,000 50,000 Saltwater Infiltration Elimination 10 75,000 75,000 Emergency Generator or Installation at EB3 11 50,000 50,000 Emergency Generator or Installation at 0136 12 50,000 50,000 Identify Grit Source Removal from Beach Lines 13 150,000 150,000 WA Ave Sewer Replacement 14 2,000,000 500,000 2,500,000 Sheldon Blvd Sewer Replacement & CE3 Upgrade 15 1,000,000 1,000,000 Oyster Bay Beach Sewer 16 250,000 1,000,000 1,250,000 Abandon Beach Sewer North of Manette Bridge 200,000 2,000,000 2,200,000 Beach Main & Critical Force Main Cleaning 75,000 200,000 200,000 200,000 200,000 875,000 Cherry Ave SS 25,000 25,000 Major maintenance Department Project Title Rank 2014 2015 2016 2017 2018 2019 Grand Total CIPP Line Existing 54" SC Under Secondary Clarifier 250,000 250,000 East & West Bremerton UGA Sewerage ULID Development 50,000 50,000 East & West Bremerton UGA Sewerage ULID Development Design & Construction 2,000,000 2,000,000 4,000,000 ESTP Outfall 100,000 450,000 550,000 Grout Annular Space of SW Bremerton FM 200,000 200,000 Improvement Between Schley & Fir Street 50,000 50,000 Improvement on Homer Jones 50,000 50,000 KLi Infrastructure 300,000 300,000 Phinney Bay & Ostrich Bay SS Extension 75,000 1,500,000 1,575,000 Primary Clarifier #1 & Drive Replacement 100,000 100,000 Primary Effluent Line Rehabilitation 400,000 400,000 Recoat Aluminum Covers on Primary Clarifiers and Biofilter 275,000 275,000 Replace Drives on RAS Pumps 100,000 100,000 Replace or Rehabilitate 10" SS Under Secondary Clarifier 150,000 500,000 650,000 Replace RAS Pumps 275,000 275,000 Secondary Clarifier #1 & 2 Drive Replacement 150,000 150,000 SKIA Sewer Design & Construction - ULID 725,000 4,750,000 5,475,000 Storage Warehouse at WWTP 450,000 450,000 Surge Tank Repair & Hypo Tank Replacement 75,000 75,000 Tracyton Beachmain Capacity Analysis & Design 500,000 500,000 Upgrade SCADA 150,000 150,000 Wastewater Reuse 250,000 250,000 Westside WWTP Outfall 150,000 2,500,000 2,650,000 Waste Capital Sum 6,220,000 4,720,000 5,520,000 11,020,000 4,136,000 4,436,000 36,052,000 Water Capital Machinery & Equipment - Water Resources 1 125,000 125,000 125,000 125,000 125,000 125,000 750,000 Machinery & Equipment - Utility Operations Mgr 2 20,000 20,000 20,000 20,000 20,000 20,000 120,000 Machinery & Equipment - Forestry 3 20,000 20,000 20,000 20,000 20,000 20,000 120,000 Taps 4 70,000 70,000 70,000 70,000 70,000 70,000 420,000 Major maintenance Department Project Title Rank 2014 2015 2016 2017 2018 2019 Grand Total Meter Replacement* 5 230,000 200,000 200,000 200,000 200,000 200,000 1,230,000 Meter Replacement Large* 6 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Fire Hydrants* 7 20,000 20,000 20,000 20,000 20,000 20,000 120,000 Forestry Rd Maintenance, Bridges & Abandonment 8 250,000 20,000 20,000 290,000 Substandard Water Main Replacement 9 700,000 200,000 200,000 200,000 700,000 200,000 2,200,000 Distribution Main Improvements 30 300,000 300,000 300,000 300,000 300,000 300,000 1,800,000 Anderson Creek Groundwater Rule CT Compliance 11 150,000 150,000 Metering System Upgrade 12 83,000 83,000 83,000 83,000 332,000 Scada Upgrade* 13 100,000 100,000 200,000 Reservoir Coatings* 14 110,000 240,000 240,000 240,000 240,000 240,000 1,310,000 Warren Ave Bridge Main Seismic Upgrade 15 10,000 10,000 Anderson Creek Water Main 16 30,000 120,000 150,000 Pressure Relief Valves 17 75,000 75,000 75,000 225,000 Casad Dam Electrical Upgrade 18 40,000 40,000 Property Purchase - Well 9 Re -Drill 19 100,000 100,000 Emergency Source Upgrade 20 100,000 100,000 Oyster Bay Public Works Consolidation 21 220,000 220,000 Jarstad Park - Interpretive /Facilities Improvements 22 10,000 10,000 Rental House at Reservoir No 4 Demo 23 20,000 20,000 24" TM at Res 4 Outlet 150,000 1,500,000 1,650,000 Anderson Creek Disinfection to Hypo 250,000 250,000 Caustic Tank Replacement at CCF 100,000 100,000 Construction of Additional W256 Water Storage 100,000 100,000 Decommission Twin Lakes Valve 50,000 50,000 Hardening of Casa Dam Overflow 200,000 200,000 Marine Drive Watermam 150,000 1,000,000 1,150,000 McKenna Falls Channel Modification 150,000 150,000 Redundancy 24" C Street from Oyster Bay to National 250,000 250,000 Replace Traveling Screens at McKenna Falls Intake 250,000 250,000 Major maintenance Department Project Title Rank 2014 2015 2016 2017 2018 2019 Grand Total Reservoir 8 Drain 30,000 30,000 Sherman Heights Watermatn Replacement 150,000 750,000 900,000 W517 Zone (POB) Capacity Evaluation and Upgrades 100,000 100,000 Well 18 Pump and Motor 100,000 100,000 Well 1R Upgrades 200,000 200,000 Well 22 Pump and Controls /PS 17 200,000 200,000 Water Capital Sum 2,883,000 2,443,000 3,323,000 2,528,000 2,645,000 2,375,000 16,197,000, Grand Total 13,378,167 20,828,950 23,549,154 24,153,680 20,618,008 20,117,898 122,645,860 Mayor maintenance Replacement Salvage Vehicle No Department Description Cost Value Mileage Replacement 0019 401 03 Chevrolet 3500 50,000 2,200 97,000 F550 W /svc bod 0076 401 2000 Jeep Cherokee 28,000 2,000 81,000 Small 4x4 SUV 1988 Chevrolet 3500 4X2 Dept to 0396 451 w/ service body 50,000 fund 167,000 F450 w /svc bod 71549 001 -20 07 Ford Crown Victoria 44,000 2,000 86,000 2014 Chev Caprice 71552 001 -20 07 Ford Crown Victoria 44,000 2,000 105,000 2014 Chev Caprice 71550 001 -20 07 Ford Crown Victoria 44,000 2,000 107,000 2014 Chev Caprice 1885 001 -51 99 Dodge 2500 P/U 24,000 2,000 89,000 % ton 4x2 P/U 1857 001 -51 01 Dodge Ram P/U 26,000 1,500 101,000 3 /4 ton 4X2 P/U No F550 w/ svc box and Longer equipment needed for 1905 001 -47 96 F350 service truck 100,000 10,000 suits 38,000 fleet work 3030 102 94 Tiger boom mower 90,000 10,000 10,000 hrs Like kind 03 Von Arx Concrete 3102 102 Grndr 15,000 0 N/A Like kind 11 TOTAL Vehicles 515,000 31,700 Vehicle 0396 will be replaced in 2014 there are no replacement funds available Department will transfer $$ to ERR to purchase The proposed "replacement" is subject to 2014 State Contract listing From Lori Smith on behalf of City Council Sent Thursday, May 09, 2013 2 23 PM To Wendy Priest Cc City Council Subject FW Response to Council Questions - Parks & Recreation CIP (Wendy Priest) Attn Wendy Below are answers to questions asked at the May 8 Study Session I also provided a copy to the rest of the Council Members for their information Thanks, Lori From: Wyn Birkenthal Sent: Thursday, May 09, 2013 10 12 AM To: City Council Subject. Park and Recreation CIP Lori, Please forward this message to Wendy it is a follow -up to a question she posed last evening regarding grant funded CIP projects Wendy, As you picked up on last night, the Parks Dept CIP presented within the current guidelines doesn't show a complete picture of the 2014 capital undertakings to improve the Park system Below is supplementary data that will to help flesh out work that will take place in 2014 and early 2015 1) Pool Filtration Upgrade - $250,000 from Park Development Fund balance Explanation When the City entered into an agreement with the Y for pool management in 2011 we agreed to correct existing deficient systems at the facility The pool filtration system is one of the "pre- existing conditions" It is the last of the items the city is responsible for, future upgrades are at the Y's expense unless other arrangements are negotiated 2) Anderson Cove Park Development - $172,000 The funding source is CDBG Block Grant, the grant was approved by Council as part of the 2013 budget adoption process last December The project is shown in 2015 as the grant agreement hasn't arrived yet from D C The dollars will be spendable in 2014 Public Works is doing advance work on the site for use as a storm water retention area in 2013 The PW project is not the park development The Park is solely funded by the Block Grant The grant does not require a city match 3) Evergreen Park Improvements - $411,700 This project does substantially more than develop the Accessible Playground Components include Reconfigured main parking lot with added handicapped accessibility, tree islands and improved storm water drainage, Shoreline tree planting, Additional pathways to improve access to the park's large shelter, restroom and playground The funding sources will each be available in 2014 A $211,350 State Recreation Grant ranks first statewide, the grant contract is anticipated to arrive in July of 2013 (Upon arrival the project will be 1 moved into the 2014 CIP) The match for the 211,350 grant is a $160,850 CDBG grant, contract already approved by Council, $42,100 in private fundraising done by the Beyond Accessible Playground organization, $8,400 of donated construction labor from community sources and a $10,000 Urban Forestry Grant This contract has arrived and will come before Council for acceptance In all the Parks Dept successfully competed for $393,350 in park improvement grants in 2013 that will be expended in 2014 As the city accelerated the CIP portion of the budget up to May the contracts for that money haven't arrived yet Wyn 2 ______________________________________________________________ CITY COUNCIL 345 6th Street, Suite 600, Bremerton, WA 98337 Phone (360) 473-5280 MAY 08, 2013 CITY COUNCIL STUDY SESSION 5:00 PM in COUNCIL CONFERENCE ROOM 603 The Study Session is open to the public but there will be no opportunities for input or participation; no action is anticipated during the Study Session; and the content of these items is subject to change. If approved by Council, the items will be placed on the May 15, 2013 Council Meeting Agenda: A. INFORMATION ITEM – Briefing on new Armed Forces Day Parade Route B. NO PRESENTATION PLANNED – The following items are budgeted items or have been reviewed by the appropriate Council Committee: 1. Renewal of Pollution Liability Insurance (premium and insurer information will be available May 8…) 2. Renewal of Service Contract with Bank of America for Banking Services 3. Extension of Interlocal Agreement with Kitsap County Administration Services for Court Security Services 4. Contract Award to JCI Jones Chemicals, Inc. for the purchase of 12.5% Bulk Sodium Hypochlorite Solution for the Westside Wastewater Treatment Plant 5. Contract Award to Stripe Rite for Installation of Hot-Applied Street Traffic Markings 6. Professional Services Agreement with Parametrix for Consultant Services for the Washington Avenue Sewer Improvement Project 7. Approval of proposed Schedule 74 Conversion Construction Agreement with Puget Sound Energy in conjunction with the Pacific Avenue – 6th to 11th Street Project C. FULL PRESENTATION ITEMS 8. Contract Award for Construction of the Pacific Avenue – 6th to 11th Street Project (Final bid information will be available on May 8...) 9. Review of Proposed Capital Improvement Plan (CIP) for the period 2014 through 2019 D. GENERAL COUNCIL BUSINESS 1. Public Works Committee Briefing – Adam Brockus, Chair 2. Other General Council Business (As Necessary...) E. ADJOURNMENT OF STUDY SESSION Americans with Disabilities Act accommodations provided upon request. Those requiring special accommodations should contact the City Clerk’s Office at (360) 473-5323 by noon on the Monday preceding the Council meeting. Memorandum To: City Council From: Roger A. Lubovich, City Attorney Re: Pollution Liability Insurance Renewal Date: May 1, 2013 In February 2013, the City submitted its application for renewal of its pollution liability insurance coverage which expires May 16, 2013. On May 1, City staff received a quote from its current carrier for renewal at the same premium as the expiring policy $47,297 (plus fees and tax). City staff was prepared to bind this coverage on May 1, 2013 and submit it to Council for discussion at the May 8, 2013 City Council Study Session, however, the City has been advised by its insurance broker, Willis of Seattle, that they have a competitive quote from another insurance company. The broker is reviewing the competing quote and will provide a recommendation upon completion of their review. As such, at the agenda submission deadline, City staff has not bound coverage for pollution liability but anticipates that coverage will be bound on or before May 8, 2013 and will be able to provide City Council with the information at that time so that the item may proceed for action on May 15, 2013. An agenda bill will be provided as soon as coverage has been bound. Office of the City Attorney Roger A. Lubovich, City Attorney AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Bank of America Banking Service Contract Renewal Study Session Date: May 8, 2013 COUNCIL MEETING Date: May 15, 2013 Department: Finance Presenter: Becky Hasart Phone: 360-473-5722 SUMMARY: Our most recent contract with Bank of America expired back on June 30, 2011. We have continued to work with Bank of America on a month to month basis. During the interim, all fees, including any discounts, have remained at the 2011 levels. Bank of America would like to have us on contract going forward. In reviewing our banking needs related to our fees, the attached agreement and fee schedule would be an addendum to the prior contact that covers a one year period with appropriate adjustments in fees. These adjustments can realize an estimated $3,500 in annual savings to the City. ATTACHMENTS: Agreement for Banking Services and Proposed Fee Schedule FISCAL IMPACTS (Include Budgeted Amount): The 2012 net banking fees were $41,488.50 (gross fees of $54,543.78 less earning allowance of $13,055.28). Earning allowance is received by the City for cash balances that remain in our Bank of America accounts. The earning allowance exceeded what the City would have received in interest earnings if that money had been invested in the Local Government Investment Pool. The proposed 2013 fees are within the 2013 budget amount for banking fees. STUDY SESSION AGENDA: ☒ No Discussion ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to authorize the Mayor to finalize and execute the Service Contract with Bank of America for Banking Services with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 11/02/12 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Extension of Inter-Local Agreement for Court Security Services Study Session Date: May 8, 2013 COUNCIL MEETING Date: May 15, 2013 Department: Municipal Court Presenter: Dawn Nelson Phone: 473-5242 SUMMARY: The Bremerton Municipal Court has an Inter-local agreement with Kitsap County Administration Services to provide security for the courthouse at 550 Park Avenue. The Inter-local agreement is good for 1 year and can be extended for an additional 12 months with written notification of the City’s intent to extend. This would extend the agreement from March 6, 2013 through March 5, 2014. Compensation will remain the same as the previous year at $57,494 per year, with uniform and uniform cleaning estimated to be $665.00. ATTACHMENTS: Inter-local Agreement for Court Security Services (KC089-09) including Attachment A listing fiscal impacts. FISCAL IMPACTS (Include Budgeted Amount): $58,159.00 Adequate funds are currently included in the 2013 Municipal Court Budget. STUDY SESSION AGENDA: ☒ No Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve the extension of the Inter-local Agreement between the City of Bremerton and Kitsap County Administrative Services and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/25/13 Revision 2000-09-02 KC-089-09-D CONTRACT AMENDMENT This CONTRACT AMENDMENT is made and entered into between KITSAP COUNTY, a municipal corporation, with its principal offices at 614 Division Street, Port Orchard, Washington 98366, hereinafter "COUNTY", and City of Bremerton, hereinafter "CONTRACTOR." In consideration of the mutual benefits and covenants contained herein, the parties agree that their Contract, numbered as Kitsap County Contract No. KC-089-09, and executed on 06/08/2009, shall be amended as follows: 1. Section 2: DURATION shall be amended to read as follows: This Amendment shall take effect March 6, 2013 for a period of 12 months. The City will have the option of extending the term by a period of an additional 12 month(s) by giving written notice to the County of its intention to extend as provided in Section 4.1 of this Agreement. 2. Section 1.2: PAYMENT OF COSTS shall be amended to read as follows: The City shall reimburse the County the costs of providing the City with a full- time Step 6 Court Security Officer, the costs of which are as identified in Attachment A hereto. The costs subject to reimbursement shall be subject to such adjustments as may be provided for in the County’s collective bargaining agreement covering its employees. Both the County and the City shall be bound by the terms and provisions of the County’s collective bargaining agreement covering court services for Court Security Officers together with any future amendments or modifications thereto. The City shall provide coverage for the Court Security Officer during the regular morning, lunchtime and afternoon breaks of the Court Security Officer with an individual designated by the City. 3. If this Contract Amendment extends the expiration date of the Contract, then the Contractor shall provide an updated certificate of insurance evidencing that any required insurance coverages are in effect through the new contract expiration date. The Contractor shall submit the certificate of insurance to: Kitsap County Risk Management Division, 614 Division Street, MS-7, Port Orchard, WA 98366. 4. Except as expressly provided in this Contract Amendment, all other terms and conditions of the original Contract, and any subsequent amendments, addenda or modifications thereto, remain in full force and effect. This amendment shall be effective upon execution by the parties. DATED this day , 2013 DATED this day ,2013 CONTRACTOR KITSAP COUNTY Patty Lent, Mayor Josh W. Brown, Chair Bremerton City Attorney’s Office Robert Gelder, Commissioner Charlotte Garrido, Commissioner ATTEST: Dana Daniels, Clerk of the Board ATTACHMENT A TO INTERLOCAL AGREEMENT FOR COURT SECURITY SERVICES The City shall reimburse the County for the wages and employment-based benefits necessary and incidental to providing the City with a full-time Step 6 court security officer under the collective bargaining agreement covering court security officers. Those costs are as follows: · Wages, benefits, and employer’s share of employment taxes (estimated to be $57,494 per year); · Uniform (estimated to be $400.00), and uniform cleaning (estimated to be $265.00 per year); · Overtime wages worked; · Cost of living increases (COLAs) authorized by the Kitsap County Board of Commissioners subsequent to this agreement; · Travel reimbursement, if applicable. In addition, in the event the court security officer assigned to the City is absent for personal reasons (e.g., sick and annual leave), the City will pay the County a per diem rate consisting of the annual wages and benefits of a Step 6 court security officer estimated to be $221.00 per day (annual salary of $57,494 divided by 260 work days per year) to cover the sick and annual leave absences. The Bremerton Municipal Court may have up to five (5) furlough days in 2013. The County has verbally agreed to exclude these dates using the daily rate based on the monthly fee of $4,791.17 ($57,494 divided by 12 month) and the number of days in that month for each respective invoice. The furlough dates will be provided by the City at a later date, of up to five furlough days. AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Award of 12.5% Bulk Sodium Hypochlorite Solution proposal, for the Westside WWTP from JCI Jones Chemicals, Inc. Study Session Date: 5/8/13 COUNCIL MEETING Date: 5/15/13 Department: PW&U/WWTP Presenter: Pat Coxon Phone: 473.5448 SUMMARY: Four proposals were received in response to a request from the City for furnishing 12.5% bulk sodium hypochlorite, to the Westside WWTP. JCI Jones Chemicals, Inc. submitted the lowest responsive proposal at $0.53 gallon/delivered, including tax. This award to JCI Jones Chemicals, Inc. will have firm pricing for a period of one year, from the time the proposal agreement is approved. The per gallon pricing includes all costs (freight and taxes). ATTACHMENTS: Sodium Hypochlorite proposals from JCI Jones Chemicals, Inc., OLIN CHLOR ALKALI, Univar USA Inc., and Northstar Chemical Inc. FISCAL IMPACTS (Include Budgeted Amount): This purchase is budgeted through the WWTP Operating Supplies Budget of $365,000.00. Bars #535.8032.53110. STUDY SESSION AGENDA: ☒ No Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve the proposal to purchase bulk 12.5% sodium hypochlorite for a period of one year from JCI Jones Chemicals Inc., at a cost of $0.053 per gallon delivered, and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/25/13 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Contract with Stripe Rite Inc. for Installation of Hot-Applied Street Traffic Markings Study Session Date: May 8, 2013 COUNCIL MEETING Date: May 15, 2013 Department: Public Works Presenter: Martin Phone: 5758 SUMMARY: This small works roster project was provided to 69 qualified contractors listed on the MRSC small works site. Two bids were received. The low bidder was Stripe Rite, Inc. with a bid of 73,405.00. The contract’s initial focus is to refresh the crosswalks in the City’s school zones; thereafter, provide additional street markings as requested. This is a pilot project for the Public Works Department and should save us considerable money (our cost to purchase just the thermoplastic material alone is about double this contract amount). In addition, we will be able to conserve our valuable street crew time for other important work. We would like to thank one of our local business owners, Mr. Robert Parker, for asking us to look into this possibility. ATTACHMENTS: 1) Contract 2) Notification of intent to pay prevailing wages – receipt 3) Insurance documentation 4) Bid summaries FISCAL IMPACTS (Include Budgeted Amount): Funding for this contract will come from Fund 102 (Streets), line item 542.3042.53110, Office and Operating Supplies. The bid amount is 73,405.00. The overall impact of this contract will be to save the City at least $35,000 in our budgeted work plan. STUDY SESSION AGENDA: ☒ No Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve a contract with Stripe Rite Incorporated for hot applied street traffic markings in the amount of $73,405.00, and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/25/13 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Professional Services Agreement with Parametrix for Consultant Services for the Washington Avenue Sewer Improvement Project Study Session Date: May 8, 2013 COUNCIL MEETING Date: May 15, 2013 Department: PW&U Presenter: Chal Martin Phone: 473-5758 SUMMARY: Based on an evaluation of qualified consultants, the Public Works Department is recommending Parametrix, Inc. to provide consulting engineering services for the Washington Avenue Sewer Improvements Project. The project includes design of residential grinder pump stations, gravity sewers, water mains, and reconstruction of a portion of Sheldon Boulevard. The not-to-exceed amount of the contract is $512,000. Phase 1 notice to proceed for design services in 2013 will not exceed $312,000, and Phase 2 notice to proceed for construction administration services will not be issued until 2014. ATTACHMENTS: 1) Council Summary; 2) Professional Services Agreement FISCAL IMPACTS (Include Budgeted Amount): The project is funded by sewer rates and has a 2013 budget of $375,000. The $196,000 in Construction Administration Services, if utilized, will be funded in 2014 from a portion of the $3,500,000 construction budget. STUDY SESSION AGENDA: ☒ No Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve the Professional Services Agreement with Parametrix for the Washington Avenue Sewer Improvements Project in the amount of $512,000.00 and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/25/13 May 15 Council Summary Washington Avenue Sewer Improvements Project COUNCIL SUMMARY WASHINGTON AVENUE SEWER IMPROVEMENTS PROJECT PROFESSIONAL SERVICES AGREEMENT Contract Summary The Washington Avenue Sewer Improvements project is scheduled for design in 2013 and for Phase 1 construction in 2014. Ultimately the project will remove the gravity sewer service connections from the 40 year old cast iron sewer main located on the beach and provide upland sewer connections for the residences on Washington Avenue. The project will allow the City to abandon the existing pipe in the beach and eliminate the private laterals that have been a chronic source of failures resulting in numerous sewage discharges into the Port Washington Narrows. In order to redirect the residential flow the City will install individual grinder pumps for each property and upgrade the downstream piping to accommodate the increase in flow. The project will also upgrade water lines in the project area and result in the reconstruction of a portion of Sheldon Boulevard between Evergreen Park and Pacific Avenue. Phase 1 construction will address the services located north of the Manette Bridge and Phase 2 will address the services south of the bridge. Phase 2 will be incorporated into the Washington Avenue Street Improvement Project that is planned for construction in 2015 and will ultimately include abandonment of the sewer main and lift station CE-3. The City has selected Parametrix Inc. to provide professional design services for this project. The scope includes both design and construction support services. Design services are $316,000 and the construction administration services are $196,000. A phased notice to proceed will be issued with the initial notice approving the design services in 2013. The City will evaluate staffing resources as the construction window approaches in 2014 and determine whether the construction management will be conducted by Parametrix or in-house staff. Fiscal Summary The 2013 design budget for this project is $375,000 and the 2014 construction budget is $3,500,000. City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project A-1 April 2013 Exhibit A – Scope of Work EXHIBIT A – SCOPE OF WORK City of Bremerton Washington Avenue Sewer Improvements Project INTRODUCTION The City of Bremerton (City) plans to upgrade their sanitary sewer and water distribution systems in the residential areas between Evergreen Park and the Manette Bridge. As part of the project, the roadway section of Sheldon Boulevard between Pacific Avenue and the Evergreen Park entrance will be reconstructed. Work elements include survey base mapping, civil engineering, permitting, bid support, and construction administration. Limits of sanitary sewer and water main improvements include the following: • Sanitary Sewer:  Washington Avenue – 900 linear feet of 8-inch PVC pipe;  11th Place – 200 linear feet of 8-inch PVC pipe;  Washington Avenue – 15 residential grinder pump stations; and  Sheldon Boulevard/13th Street – 1,400 linear feet of 10-inch C-900 PVC pipe. • Water Main:  Washington Avenue – 900 linear feet of 8-inch ductile iron pipe;  11th Place – 200 linear feet of 8-inch ductile iron pipe;  Highland Avenue – 500 linear feet of 8-inch ductile iron pipe; and  Sheldon Boulevard/13th Street – 1,400 linear feet of 8-inch ductile iron pipe. The phase and task breakdown for the project is designated as follows: • Phase 1 – Design Services  Task 1 – Project Management  Task 2 – Preliminary Engineering  Task 3 – Survey and Mapping  Task 4 – Design (60%, 90%, and Final)  Task 5 – Utility Purveyor Coordination  Task 6 – Public Outreach  Task 7 – Permitting Support  Task 8 – Bid Support  Task 9 – Record Drawings  Task 10 – Additional Services City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project A-2 April 2013 Exhibit A – Scope of Work • Phase 2 – Construction Administration Support Services  Task 1 – Project Management Support  Task 2 – Construction Surveying  Task 3 – Construction Observer  Task 4 – Administrative Assistant PHASE 1 – DESIGN SERVICES Task 1 – Project Management Objective To plan, organize, direct, control, and communicate all relevant activities set forth in this Scope of Work within the approved budget and schedule. Approach Parametrix will routinely review project progress and communicate project status on a regular basis. Communication will be through email and telephone, and with monthly project coordination meetings with the City and Parametrix staff. This task will include the following activities: • Project administration includes scheduling maintenance, cost control, filing, resource allocation, subconsultant management, and routine communications. • Develop a Project Work Plan and Schedule. • Conducting a project kick-off meeting with Parametrix and City staff. • Team coordination, including conference calls and internal meetings. • Monitoring changes to the scope, budget, or schedule and developing change management strategies with the City. • Quality control reviews and quality assurance documentation. Deliverables The following deliverables will be submitted under this task: • Project Management Plan. • Minutes and meeting notes. • Monthly action agenda. • Summary of issues identified during a monthly project team meeting. • Monthly invoices and status reports. City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project A-3 April 2013 Exhibit A – Scope of Work Assumptions The following assumptions apply: • Project duration will be 18 months. This assumes a design phase duration of 8 months, a bid and construction phase of 6 months, and a project close-out phase of 2 months. • Bi-weekly meetings will be less than 2 hours long. • Monthly reports will be provided with timely invoices. • Project-related issues will be identified, communicated, and resolved. Task 2 – Preliminary Engineering Objective Perform hydraulic analysis of sewer service options for Sheldon Boulevard; and develop water main alignments scenarios; and develop roadway section upgrade options for Sheldon Boulevard. Approach This task will include the following activities: • Evaluate the gravity sewer capacity along Sheldon Boulevard under the following conditions, with the assumption that LS CE3 is abandoned and residents along Washington Avenue will be served by new grinder pump stations: 1) Existing development conditions; 2) Existing development conditions, with existing sewer lines on Highland, Pleasant, and Pacific connected to Sheldon Boulevard and Washington Avenue sewer flows connected to 11th Place; 3) Full build-out conditions for Condition No. 2 above and the mixed use development lots along Sheldon Boulevard to have individual lift stations that pump to 12th Street; and 4) Condition No. 3 above, but with gravity sewer service to Sheldon Boulevard. • Prepare preliminary horizontal alignments of the sewer, water, and stormwater utilities, and present findings/recommendations to the City in a workshop setting. • Develop two (2) roadway section improvement options for Sheldon Boulevard, including new sidewalk along the south side of the roadway, and present findings/recommendations to the City in a workshop setting. • Investigation of possible contaminated soil sites along the project route through the Washington State Department of Ecology’s website. • Coordination with the City staff on key design issues, such as location of isolation valves for the water mains, sequence of construction for utility main connections, locations of utility potholing, etc. • Prepare and submit 30% plans and opinion of probable construction costs to the City for review and comment. • Attend 30% design review meeting with the City at their office. City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project A-4 April 2013 Exhibit A – Scope of Work Deliverables The following deliverables will be submitted under this task: • Three half-size sets of 30% design drawings. • Detail project schedule. • 30% level opinion of probable construction costs. Assumptions The following assumptions apply: • City will TV inspect the existing sanitary sewer along Sheldon Boulevard. • City will provide electronic copies of standard details. • Utility drawings will be plan/profile at 1 inch =20 feet scale horizontal and 1 inch =5 feet vertical. • Traffic control plans will not be included in 30% design submittal. • Technical specifications will not be included in 30% design submittal. Task 3 – Survey and Mapping Objective To generate survey and mapping data for development of CADD base maps in support of design activities. Approach The following approach applies: • Determine and initiate field survey needs for the project, based on proposed utility alignments. Survey limits will also include the second phase of sewer improvements along Washington Avenue between the Manette Bridge and 6th Street. • Obtain record drawings from utility purveyors with buried and aerial utilities within the project corridor. • Coordinate with a private utility marking service to mark buried utilities within the project corridor. • Combine base mapping developed by Parametrix in areas that were previously mapped for other projects into one base map to be utilized for this project. • Field check work performed by the City of Bremerton throughout the side sewer project along Washington Avenue. • Parametrix survey crews will gather topographic field data that will include the marked utilities, sewer and storm water structure invert elevations and pipe diameters, roadway surface features, etc., within the limits of the existing rights-of-ways. • Obtain limits rights-of-way and parcel lines from City through their GIS database. • Parametrix will correlate the project mapping to the City’s aerial photography. • Prepare a topographic base map of the project site that is comprised of the field survey data. City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project A-5 April 2013 Exhibit A – Scope of Work Deliverables Electronic files for use in preparing design plans. Assumptions The following assumptions apply: • Parametrix survey will provide control throughout the entirety of the project limits. • Base map developed will be done in a manner that will provide a 1 foot contour interval map. • The City will provide as-builts of sewer and water utilities. • Parametrix will perform measure downs of existing storm water and sanitary sewer facilities to determine pipe size, material, and invert elevations. • If required, the City will pothole existing utilities at critical crossings to avoid underground conflicts. Parametrix will survey the surface elevation and translate the measure down data to establish location of utility. It is assumed that approximately 5 potholes will be required to support the design of this project. It is assumed that the City’s GIS property information will be sufficient to complete this design project. Task 4 – Design (60%, 90%, and Final) Objective Prepare 60%, 90%, and Final Plans, Specifications, and Opinion of Probable Construction Costs for the sewer and water improvements. Approach Activities under this task will include the following elements: • 60% Design: This submittal will include the preparation of the Plans, Specifications, and Cost Estimate to include:  Incorporation of 30% design review comments.  Incorporation of preliminary design of residential grinder pump stations along Washington Avenue, as prepared in previous technical memorandum.  Coordinate with the City for limits of roadway restoration and traffic control requirements.  Four general sheets, which include the cover; legend, abbreviations, and notes; overall site plan; and survey control plan.  Eight plan/profile sheets of sewer/water main improvements, depicting both sewer and water main construction elements per sheet.  Two plan sheets of individual grinder pump sewer services.  Four plan/profile sheets of roadway and stormwater improvements along Sheldon Boulevard.  Two surface restoration and trench detail sheets.  Two sewer detail sheets.  Two water main detail sheets. City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project A-6 April 2013 Exhibit A – Scope of Work  Two roadway intersection detail sheets.  One roadway detail sheet.  Two traffic control plans depicting sequence of construction impacts to the area and alternate traffic access routes.  Two traffic control detail sheets.  Technical specifications.  Opinion of probable construction costs.  Quality assurance and quality control of deliverables to the City.  One 60% Submittal review meeting with the City at their office. • Draft Contract Documents (90%) to include:  Incorporation of 60% review comments by the City.  Refinement of the 60% design of the civil design elements.  Finalization of Opinion of Probable Construction Costs.  Preparation of a brief memo that outlines the significant design element changes/additions that were performed after the 60% submittal.  Submission of 90% plans and specifications to the City for final review and comment.  One 90% Submittal review meeting with the City at their office. • Final Contract Documents to include:  Finalized Plans and Specifications submitted to the City for public bid processing. Deliverables The following will be delivered under this task: • Design Development Submittal (60%):  Three half-size (11 inches by 17 inches) sets of 60% Plans and Specifications.  Opinion of Probable Construction Costs. • Draft Contract Documents (90%):  Three half-size sets of 90% Plans and Specifications.  Opinion of Probable Construction Costs.  Design memo of outlining changes/additions to the 60% submittal. • Bid Documents:  Submit one electronic set and one paper set of Contract Documents, including Plans, Specifications, and Opinion of Probable Construction Costs. The Final Design Documents will also include the following:  Full-size stamped bond plans.  An AutoCAD 2012 format disc that contains supporting files, including plot files, shape files, fonts, and reference files; an electronic MS Word file of Specifications along with one camera-ready 8.5-inch by 11-inch printed file. City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project A-7 April 2013 Exhibit A – Scope of Work Assumptions The following assumptions apply: • The City will provide review comments for the 60% and 90% submittals to Parametrix within 2 weeks of our submission of these documents. Comments will be compiled by the City in one MS Word document. • Project manual will be based on WSDOT format. • Geotechnical engineering services for grinder pump installation will be provided by Shannon & Wilson, whom are under a separate contract with the City. Task 5 – Public Outreach Objective Coordinate with City staff and individual property owners along Washington Avenue whose sewer services are to be switched over to grinder pumps and their gravity sewer service to the beach main abandoned. Activities Consultant shall perform the following activities associated with this task: • Develop a public outreach plan with the City to inform the public of the proposed sewer service revisions. • Assist the City in planning and participate in a public information meeting. • Prepare and mail out information flyers to Washington Avenue residents of public meeting. • Meet with individual property owners on-site and present them with the preliminary grinder pump service design and abandonment of their gravity sewer service. Parametrix will also inspect the property owner’s electrical panel to determine if any upgrades are required to adequately power the new grinder pump stations. City staff will participate in this meeting. • Meet a second time with individual property owners on-site and present them with the final grinder pump service design and abandonment of their gravity sewer service. City staff will participate in this meeting. • Meet a third time with individual property owners on-site and obtain their signature on the City’s sewer service agreement. City staff will participate in this meeting. Deliverables Consultant shall deliver the following: • Public information meeting flyers to the City for mailing. • Individual grinder pump design plans for each property owner, including necessary upgrades of the property owner’s electrical panel to support the new grinder pump stations. City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project A-8 April 2013 Exhibit A – Scope of Work Assumptions The following assumptions are associated with this task: • Fifteen (15) individual property owners are to receive grinder pumps. • The City will coordinate logistics related to public meetings. • The Consultant shall provide prepared originals for mailings, public notices, etc., and the City will be responsible for distribution of materials and/or information. Task 6 – Utility Coordination Objective Assist the City with contacting public utility purveyor companies (power, telecommunication, and gas) to see if they want to participate in the utility upgrades along Sheldon Boulevard. Approach Activities under this task will include the following elements: • Contact by phone and email the local utility purveyors, on behalf of the City, to determine their interest in participating in the project. • Schedule and facilitate a meeting with the utility purveyors. • Provide utilities with project base map for their design. • Calculate the estimated construction costs to be shared by the utility purveyors, such as traffic control, mobilization, etc. for the City to review and negotiate. • Coordinate with the utility purveyor’s design team for incorporating their plans and specifications into the overall project bid package. Deliverables The following items will be delivered: • Topographic base map of project area to utility purveyors. • Copies of design correspondence with utility purveyor to the City. Assumptions The following assumptions apply: • Utility purveyors design will be incorporated into the bid package as separate sheets. • Parametrix will be responsible only for the City design elements. • Separate bid items will be prepared for the non-City bid items. City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project A-9 April 2013 Exhibit A – Scope of Work Task 7 – Permitting Support Objective Prepare and submit permit applications for the sewer and water main improvements. Comply with State of Washington Environmental Policy Act (SEPA), and meet the regulatory requirements of the City and Department of Health. Approach Activities under this task will include the following elements: • Prepare one draft and one final version of the SEPA Environmental Checklist. • Prepare the following permit applications:  Shoreline Substantial Development Permit.  Ecology NPDES General Construction Stormwater Permit. • Assist the City with preparing a Public Notice as part of the SEPA permitting requirements. • Respond to comments and questions from the agencies. Deliverables The work product will include: • SEPA Environmental checklist (draft and final version). • Completed permit applications for the following:  Shoreline Substantial Development Permit.  Ecology General Construction Permit. Assumptions The following assumptions apply: • The SEPA checklist will result in a Determination of Non-Significance or Mitigated Determination of Non-Significance. • The project will not require any federal permits or approvals. • Parametrix will provide one review copy of the draft SEPA checklist for review by the City and will make changes to the checklist based on comments from them. The revised document will then be finalized and submitted to the City. • The City will pay all permitting fees. Task 8 – Bid Support Objective Assist the City in the bid selection process and award of the construction contract. City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project A-10 April 2013 Exhibit A – Scope of Work Approach Activities under this task will include the following elements: • Assemble and deliver the bid documents to ARC for distribution to bidders. • Attend the Pre-Bid Conference at the project site. • Answer questions from bidders and prepare addenda, as required. Deliverables Work products will include: • Addenda, as required. Assumptions The following assumptions apply: • City will conduct the pre-bid conference. Task 9 – Record Drawings Objective Prepare record drawings of the work actually performed during construction. Approach Activities under this task will include the following elements: • Revise construction document drawings based on redlines provided by the Contractor. Revisions will be made in the AutoCAD files. • A record drawing note will be added to each sheet. Parametrix will coordinate with the City for the preferred wording. • Submit draft of Record Drawings to the City for review and comment. Parametrix will incorporate these edits and finalize the Record Drawings. • Plot Mylar and half-size sets. • Submit Mylar set and half-size bond sets to the City, with CD as listed below under “Deliverables.” Assumptions The following assumptions apply: • The Contractor will provide all redlines to Parametrix. City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project A-11 April 2013 Exhibit A – Scope of Work Deliverables Parametrix will submit the following to the City: • One full-size Mylar set of Record Drawings. • Five half-size bond sets of the Record Drawings. • CD of AutoCAD drawings in AutoCAD 2012 format. Task 10 – Additional Services To cover the costs of project work items that are unforeseen by the City, a task budget of $40,000 is incorporated into this Contract. Labor effort will not be charged to this task unless authorized in writing by the City. PHASE 2 CONSTRUCTION ADMINISTRATION SERVICES The construction administration tasks identified under this phase are to be in support of the City’s construction manager. Prior to the start of construction, the City will decide which of these tasks will be performed by Parametrix. No construction administration work will be performed, unless authorized in writing by the City. The scope of each task is outlined below with an assumption of the weekly labor hours involved over a construction period of 6 months. Task 1 – Project Management Support Objective To coordinate with the City’s project manager on a weekly basis on design related questions or other related issued during the construction phase. Approach Communication between the Parametrix project manager and the City’s project manager will be through email and telephone, and include occasional construction site visits or attendance of weekly construction meetings. It is assumed that the average time commitment will be 2 hours per week. Deliverables None Assumptions None Task 2 – Construction Surveying Objective Provide construction survey staking in support of construction activities. City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project A-12 April 2013 Exhibit A – Scope of Work Approach Activities under this task will include the following elements: • Coordinate with the Construction Manager and the Contractor for staking tasks. • Sewer Manholes and Mains: 1(one) offset stake and hub will be provided at approximately 50-foot intervals along the sewer main lines with cut/fill identified to pipe invert. Along Sheldon Boulevard, the staking intervals will be 25 feet due to the sensitivity of the pipe slope along this route. 2(two) offset stakes and hubs will also be provided for every Manhole along the sewer main lines, with cut/fill identified to invert and rim. • Water Line Staking: 1(one) offset stake and hub will be provided at +/- 50-foot intervals and/or appropriate angle points along the new 10-inch and 8-inch water lines, along with Fire Hydrants and other appurtenances associated with the water lines. • Storm Structures and Lines: 1(one) offset stake and hub will be provided at approximately 50-foot intervals along the storm lines within the full roadway construction areas. 2(two) offset stakes and hubs will also be provided for every Manhole or Catch Basin along the storm lines, with cut/fill identified to invert and rim. • Roadway Staking:  Rough grade: 1(one) stake will be set every 25 feet along the proposed roadway centerline. Stake will denote cut/fill to finish roadway grade.  Curb Staking: 1(one) offset stake will be set every 25 feet along the proposed curb line. Stake will denote cut/fill to top back of curb.  Sidewalk staking: 1(one) offset stake will be set every 25 feet along the proposed back of sidewalk. Stake will denote cut/fill to back of sidewalk finish grade. • As-Built Staking: Rim and invert elevations of new sewer and storm drainage structures; horizontal locations of grinder pump stations; water main valves; fire hydrants; and other constructed utility features. Assumptions The following assumptions apply: • Cost estimates associated with this task are based on a minimum of one field crew day (8 hours) with associated office support. • Cost estimates contained herein are based on a one time staking effort for all features described above. Stakes that become destroyed and require replacement will be charged to the contractor on a time and expense basis according to rates based on the prevailing wage rates for Kitsap County at the time services are performed, per State funding requirements for construction related activities. • The cost of traffic control needed (if any) has not been included in this scope of services. It is assumed that traffic control for the site, if needed, will be provided by the Contractor. • The above work described that falls within the definition of a “Construction Site Survey” as defined in WAC 296-127-01396 will be performed under the prevailing wage rate at the time the prime contract was awarded and not based on prevailing wage rates that are in affect after City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project A-13 April 2013 Exhibit A – Scope of Work Deliverables Parametrix will submit the following to the City: • Construction staking notes, as required. • Cut sheets, as required, of work performed. Task 3 Construction Observer Goal Parametrix will provide one (1) full-time observer to monitor construction activities. Approach The following approach will be taken: • Monitor the Contractor’s construction activities daily to verify work is in accordance with the contract documents, the design represented therein, and its intent. • Prepare field reports for the days on-site describing the Contractor’s activities that identify the site conditions, the effort in which the Contractor executed the work, the work performed, and any issues of concern. • Monitor records of daily work completed. Meet with the City and Contractor monthly to review unit pay quantities for partial payment requests. • Collect truck tickets of imported and exported materials. • Take digital photographs of construction progress and issues and provide to City as attachments to daily reports. • Assist City project manager in reviewing record drawings prepared by the Contractor that depict the conditions of the work as it progresses. Deliverables The following will be submitted: • Construction Daily Report, three copies each. Assumptions The following assumptions apply: • On-site construction observation will be coordinated with the Contractor based on their construction schedule, weekly construction meetings, and communications during the period of construction. • Parametrix is not responsible for the Contractor’s construction means and methods; project site safety; Contractor’s failure to perform; and is not authorized to stop the work of the Contractor. • Construction will be in substantial compliance with the plans and specifications prepared by Parametrix. • Construction observation services will be 45 hours per week. City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project A-14 April 2013 Exhibit A – Scope of Work • The duration of construction is assumed to be 180 calendar days, with substantial completion to be within the first 150 calendar days. • The City’s will be responsible for the review of all product submittals, responding to RFIs, review of partial payment requests, administering all change orders, issuing the notice of substantial completion, and all other contract related responsibilities. Task 4 Administrative Assistant Goal Provide one part-time construction administration assistant to support the City’s construction project manager during the construction phase of the project. Approach The following approach will be taken: • Assist in the preparation of correspondence to and from the contractor and permitting agencies. • Attend weekly progress meetings, assist the City, as necessary, and provide meeting minutes to all parties. • Perform construction administrative duties associated with construction documentation (i.e. submittals, RFIs, work change directive, photos, daily reports, performance and materials testing and inspection documentation, etc.) to assist the City construction project manager. • Assist the City in the preparation of a pre-final and a final construction pay estimate for the project; and any necessary close out change order. Deliverables None Assumptions The following assumptions apply: • Construction administrative assistant will coordinate all their work activities with the City’s construction project manager. • Construction administrative assistant services will be 16 hours per week. • The duration of construction is assumed to be 180 calendar days, with substantial completion to be within the first 150 calendar days. City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project B-1 April 2013 Exhibit B – Schedule EXHIBIT B SCHEDULE Notice to Proceed: June 2013 Survey Base Map Completion: July 2013 Preliminary Design Completion: August 2013 60% Design Completion: October 2013 90% Design Completion: December 2013 Final Design Completion: February 2014 Advertisement for Bids: February – March 2014 Construction Notice to Proceed: April 2014 Construction Substantial Completion: September 2014 Project Close-out: November 2014 City of Bremerton 236-1896-868 (01/04) Washington Avenue Sewer Improvements Project C-1 April 2013 Exhibit C – Budget EXHIBIT C BUDGET PHASE 1 –DESIGN SERVICES Task 1 Project Management $25,000 Task 2 Preliminary Engineering $29,000 Task 3 Survey and Mapping $35,000 Task 4 Design (60%, 90%, and Final) $135,000 Task 5 Public Outreach $22,000 Task 6 Utility Coordination $11,000 Task 7 Permitting Support $6,000 Task 8 Bid Support $5,000 Task 9 Record Drawings $8,000 Task 10 Additional Services $40,000 Phase 1 Total: $316,000 PHASE 2 – CONSTRUCTION ADMINISTRATION SERVICES Task 1 Project Management Support $11,000 Task 2 Construction Surveying $14,000 Task 3 Construction Observer $132,000 Task 4 Administrative Assistant $39,000 Phase 2 Total: $196,000 PHASE 1 AND 2 PROJECT TOTAL: $512,000 Parametrix Billing Rate Ranges - October 1, 2012 through September 30, 2013. Classification Grade Range of Billing Rates Classification Grade Range of Billing Rates CADD Operator I 8 $65 - $80 Jr. Planner 8/9 $60 - $85 CADD Operator II 9/10 $75 - $90 Planner I 10 $65 - $95 CADD Operator III 11 $85 - $120 Planner II 11 $90 - $110 CADD Supervisor 12 $95 - $125 Planner III 12 $105 - $125 CADD Services Manager 14 $115 - $135 Planner III 13 $110 - $130 Planner IV 14 $115 - $140 Designer I 10 $90 - $110 Sr. Planner 15 $130 - $165 Designer II 11 $90 - $115 Sr. Planner 16 $160 - $180 Designer III 12 $110 - $130 Sr. Planner 17 $175 - $200 Designer III 13 $125 - $145 Designer IV 14 $120 - $155 Jr. Scientist/Biologist 8/9 $65 - $85 Sr. Designer 15 $140 - $165 Scientist/Biologist I 10 $80 - $100 Sr. Designer 16 $160 - $175 Scientist/Biologist II 11 $95 - $115 Sr. Designer 17 $170 - $185 Scientist/Biologist III 12 $100 - $120 Scientist/Biologist III 13 $105 - $125 Engineering Technician I 8 $60 - $90 Scientist/Biologist IV 14 $110 - $135 Engineering Technician II 9 $75 - $95 Sr. Scientist/Biologist 15 $130 - $165 Engineer I 10 $80 - $105 Sr. Scientist/Biologist 16 $165 - $180 Engineer II 11 $90 - $115 Sr. Scientist/Biologist 17 $170 - $185 Engineer III 12 $95 - $125 Engineer III 13 $110 - $140 Environmental Technician I 8 $65 - $90 Engineer IV 14 $115 - $150 Environmental Technician II 9 $75 - $95 Sr. Engineer 15 $135 - $165 Environmental Technician III 10 $90 - $115 Sr. Engineer 16 $155 - $190 Sr. Engineer 17 $165 - $200 Hydrogeologist I 10 $85 - $100 Sr. Consultant 18 $175 - $200 Hydrogeologist II 11 $90 - $110 Sr. Consultant 19 $180 - $200 Hydrogeologist III 12/13 $100 - $115 Hydrogeologist IV 14 $105 - $130 Jr. Surveyor 8 $60 - $75 Sr. Hydrogeologist 15 $135 - $160 Surveyor I 9 $70 - $90 Sr. Hydrogeologist 16 $155 - $175 Surveyor II 10 $75 - $95 Sr. Hydrogeologist 17 $170 - $185 Surveyor III 11 $90 - $110 Sr. Surveyor 12 $105 - $130 GIS Technician 9 $85 - $100 Sr. Surveyor 13 $125 - $150 GIS Analyst 10 $90 - $105 Survey Supervisor 14 $140 - $155 Sr. GIS Analyst 11 $95 - $110 Constr Technician I 8/9 $80 - $95 Graphic Artist 9 $75 - $100 Constr Technician II 10 $90 - $120 Sr. Graphic Artist 10 $95 - $125 Constr Technician III 11 $110 - $135 Constr Technician IV 12 $115 - $140 Technical Aide 7 $60 - $80 Sr. Construction Technician 13 $125 - $145 Sr. Technical Aide 8 $75 - $90 Construction Mgr. I 11 $100 - $125 Project Coordinator 9 $80 - $95 Construction Mgr. II 12 $115 - $135 Sr. Project Coordinator 10 $85 - $105 Construction Mgr. III 13 $115 - $140 Project Controls Specialist 11 $90 - $115 Construction Mgr. IV 14 $130 - $155 Project Coordination Supervisor 11 $95 - $120 Sr. Construction Manager 15 $145 - $170 Sr. Construction Manager 16 $160 - $180 Project Accountant 7/8 $80 - $100 Sr. Construction Manager 17 $175 - $200 Project Accountant 9/10 $85 - $105 Site Construction Manager 18 $180 - $200 Sr. Project Accountant 10 $90 - $110 Sr. Accounting Specialist 10 $95 - $115 Operations Manager 16 $145 - $170 Sr. Contract Administrator 11 $100 - $125 Operations Manager 17 $160 - $180 Operations Manager 18 $175 - $200 Office Clerk 4 $45 - $60 Division Manager 17 $180 - $200 Receptionist 6 $50 - $75 Division Manager 18/19 $200 Admin Assistant 6 $55 - $80 Program Manager 19 $200 Admin Assistant 7 $55 - $85 Program Manager 20 $200 Sr. Admin Assist 8 $60 - $85 Principal Consultant 19 $200 Sr. Admin Assist 9 $80 - $95 Principal Consultant 20 $200 Office Administrator 10 $90 - $105 Principal 19/20 $200 Sr. Office Administrator 11 $95 - $110 Office Admin Manager 12-14 $100 - $140 Word Processor 7 $55 - $75 Sr. Word Processor 8 $70 - $90 Word Processing Specialist 9 $85 - $110 Technical Editor 10 $90 - $115 Word Proc Supervisor 10 $95 - $120 Word Proc Mgr/Editor 11 $105 - $125 Production Manager 11/12 $110 - $130 C-2 September 21, 2012 Copy of 2012-09B1IndBillingRates.xls AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Approval of proposed Schedule 74 Conversion Construction Agreement with Puget Sound Energy in Conjunction with the Pacific Avenue – 6th to 11th Streets Project. Study Session Date: May 8, 2013 COUNCIL MEETING Date: May 15, 2013 Department: PW&U Presenter: Chal Martin Phone: 360.473.5758 SUMMARY: With the urban redevelopment of Pacific Avenue, the City has chosen to underground the private aerial facilities from 6th Street up to 9th Street, including electrical. The underground conversion is to be completed in accordance with Puget Sound Energy (PSE) Tariff G, Schedule 74. Approval of the design phase of the Schedule 74 agreement was approved by City Council April 20, 2011. The design of the conversion has now been completed and accepted by the City and PSE, and the attached Construction Agreement is now to be approved by City Council. ATTACHMENTS: 1.Construction Agreement. FISCAL IMPACTS (Include Budgeted Amount): Total estimated cost to the City for completion of the Schedule 74 with PSE will be approximately $143,206; 86.5% of the total costs are funded by grants. The 13.5% matching cost to the City is $19,333. Private property owners are responsible for their costs associated with the undergrounding. The project is included in the Arterial Street Budget. STUDY SESSION AGENDA: ☒ No Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve proposed Schedule 74 Conversion Construction Agreement with PSE and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/25/13 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Contract award for construction of the Pacific Avenue – 6th to 11th Streets Project Study Session Date: May 8, 2013 COUNCIL MEETING Date: May 15, 2013 Department: PW & U Presenter: Chal Martin Phone: 360.473.5758 SUMMARY: The City received federal funding from the Puget Sound Regional Council (PSRC) to make urban redevelopment improvements on Pacific Avenue from 6th to 11th Streets. The project includes a complete reconstruction of the roadway with all new City utilities, undergrounding of the private utilities from 6th to 9th Streets, new aerial utilities from 9th to 11th Streets, a new urban trail connecting the downtown core to Evergreen Park, and Low Impact Development (LID) techniques. The City advertised the project on April 11th and received ___ bids on May 2nd. The apparent low, responsive, responsible bidder was ________________________ for $________________________________. ATTACHMENTS: 1) Council Summary; 2) Agreement; 3) Bid Tabulation FISCAL IMPACTS (Include Budgeted Amount): The project is included in the Arterial Street Fund with a budget of $3,070,000. The grant amount for construction is $2,423,181, and requires a 13.5% match. Funding for the utility replacement is included in the Water Fund at $500,000 and Wastewater Fund at $550,000. Matching funds are from the fund balance in the Arterial Street Fund, and from the utility replacement. STUDY SESSION AGENDA: ☐ No Discussion ☒ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve award of the contract for the Pacific Avenue – 6th to 11th Streets Project and authorize the Mayor to finalize and execute the agreement with _______________, in the amount of $__________________, with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 11/02/12 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Review of proposed Capital Improvement Plan (CIP) for the period spanning 2014 thru 2019. Study Session Date: May 8, 2013 COUNCIL MEETING Date: May 15, 2013 Department: Financial Services Presenter: Becky Hasart Phone: 473-5722 SUMMARY: Each year staff updates the six-year Capital Improvement Plan with recommended capital improvement projects and equipment purchases. CIP projects and budget appropriations are adopted annually as part of the normal budget process. This year, the City is moving toward a more traditional budget development timeframe by presenting the proposed CIP during May. This also allows Council additional time for consideration of the list and proposed priority ranking. Projects for 2014 are ranked in priority order and, if affirmed by Council, the priority ranking will be used to determine which projects will be given consideration as funding is identified during the revenue projection process in June. ATTACHMENTS: CIP Citywide Summary, Project Listing by Fund and ER&R Vehicle Replacement List. FISCAL IMPACTS (Include Budgeted Amount): Will be determined as part of the 2014 budget process. STUDY SESSION AGENDA: ☐ No Presentation ☒ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: None at this time. This item is being presented for consideration and affirmation of priority rankings. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/25/13 Classification (All)5/1/2013Sum of Amount YearFund Department2014 2015 2016 2017 2018 2019 Grand TotalGeneral Fund Fire 87,652 590,000 1,100,000 950,000 2,727,652General Facilities 119,000 70,000 30,000 15,000 234,000Arterial Streets 150,000 150,000Streets 625,000 8,660,000 9,030,000 6,880,000 10,430,000 11,070,000 46,695,000Parking Operating 35,000 15,000 75,000 125,000Police Special Projects 50,000 50,000 50,000 50,000 50,000 50,000 300,000BKAT 46,000 46,000 30,000 20,000 25,000 25,000 192,0001% for Arts 10,000 10,000 10,000 10,000 40,000Park Facilities 250,000 478,350 2,135,000 823,900 305,000 3,992,250Evergreen Park Remediation 36,500 36,500 53,500 50,000 176,500Lower Wheaton Way 1,591,015 1,591,015Equip Rent & Res 515,000 1,850,100 1,827,654 1,321,780 2,352,008 1,131,898 8,998,440Information Tech 25,000 30,000 55,000Storm Capital 770,000 1,870,000 370,000 470,000 620,000 1,020,000 5,120,000Waste Capital 6,220,000 4,720,000 5,520,000 11,020,000 4,136,000 4,436,000 36,052,000Water Capital 2,883,000 2,443,000 3,323,000 2,528,000 2,645,000 2,375,000 16,197,000Grand Total 13,378,167 20,828,950 23,549,154 24,153,680 20,618,008 20,117,898 122,645,857Citywide Summary Department Project TitleRank 2014 2015 2016 2017 2018 2019 Grand Total1% for Arts Public Art Work10,000         10,000         10,000         10,000         40,000            1% for Arts Sum‐                     ‐                    10,000         10,000         10,000         10,000         40,000            Arterial Streets Pacific Avenue Improvements ‐ 6th St to 11th St1 150,000       150,000          Arterial Streets Sum 150,000        ‐                     ‐                     ‐                     ‐                     ‐                    150,000          BKAT BKAT Production Equipment Upgrades1 46,000         46,000         30,000         20,000         25,000         25,000         192,000          BKAT Sum46,000         46,000         30,000         20,000         25,000         25,000         192,000          Equip Rental & Res Replacement of City Vehicles & Equipment1 515,000       1,850,100    1,827,654    1,321,780    2,352,008    1,131,898    8,998,440       Equip Rental & Res Sum 515,000       1,850,100    1,827,654    1,321,780    2,352,008    1,131,898    8,998,440      Evergreen Park RemediaRemediation Monitoring1 36,500         36,500         53,500         50,000         176,500          Evergreen Park Remediation Sum 36,500         36,500         53,500         50,000          ‐                     ‐                    176,500          Fire Thermal Imaging Cameras1 30,945         30,945            Breathing Air Compressors2 45,000         45,000            Bunker Gear Dryers3 11,707         11,707            Architectural Study for Fire Station Improvements40,000         40,000            Controlled Intersection of Sylvan/Sheridan & Olympus200,000       200,000          Electronic Sign for Station #150,000         50,000            Fire Engine Replacement550,000       550,000       550,000       1,650,000       Remodel Fire Station #2350,000       350,000          Remodel Fire Station #3350,000       350,000          Fire Sum87,652         590,000       1,100,000    950,000        ‐                     ‐                    2,727,652      General Facilities Court Elevator Security Cameras1 11,000         11,000            Library Security Camera System2 12,000         12,000            Naval Museum Emergency Exit3 11,000         11,000            Court Facility ‐ Sidewalk and Curb/Gutter Replacement4 10,000         10,000            Mobile Sweeper5 20,000         20,000            Equip Services ‐ HVAC Upgrade6 10,000         10,000            Old Cencom Building ‐ Replace Leaking Roof7 35,000         35,000            Fire Station #3, 3031 Olympus Dr., Custom Cabinetry8 10,000         10,000            Equip. Services, 100 Oyster Bay ‐ Enclose Work Bay70,000         70,000            * Major maintenance Department Project TitleRank 2014 2015 2016 2017 2018 2019 Grand TotalLibrary 5th St. Planter Lighting15,000         15,000            Library 5th St. Water Fixtures30,000         30,000            General Facilities Sum 119,000       70,000          ‐                    30,000         15,000          ‐                    234,000          Information Tech Storage Array Upgrade25,000         30,000         55,000            Information Tech Sum‐                     ‐                    25,000          ‐                    30,000          ‐                    55,000            Lower Wheaton Way Lower Wheaton Way1 1,591,015    1,591,015       Lower Wheaton Way Sum 1,591,015     ‐                     ‐                     ‐                     ‐                     ‐                    1,591,015      Parking Operations Parking Facility, 405 Washington Ave, Guard Rails1 15,000         15,001            Harborside Parking Security Camera System2 20,000         20,002            Parking Lots , 796 Burwell, 801 4th St and 507 Park ‐ Parking Lot Lighting75,000         75,000            Parking Lots , 796 Burwell, 801 4th St and 507 Park ‐ Parking Lot Signs15,000         15,000            Parking Operations Sum 35,000         15,000         75,000          ‐                     ‐                     ‐                    125,003          Parks Capital Pool Filtration and Chemical Feed System Upgrades1 250,000       250,000          Anderson Cove Waterfront Park Development172,000       172,000          Evergreen Park ‐ Chevron Property Improvements40,000         40,000            Evergreen Park Accessible Play Project261,350       261,350          Forest Ridge Playground Improvements55,000         55,000            Lions Park ‐ Dock Renovation120,000       120,000          Maintenance Facility Relocation373,900       373,900          N.A.D. Park Safety Improvements250,000       250,000          Neighborhood Park Expansion250,000       250,000          Off‐Leash Dog Park Project45,000         45,000            Pendergast Soccer Field Artificial Turf1,350,000    1,350,000       Pendergast Soccer Field Restroom200,000       200,000          Sheridan Park Community Center Energy Efficiency175,000       175,000          Warren Avenue Playfield Renovation450,000       450,000          Parks Capital Sum 250,000       478,350       2,135,000    823,900       305,000        ‐                    3,992,250      * Major maintenance Department Project TitleRank 2014 2015 2016 2017 2018 2019 Grand TotalPolice Special Projects Machinery & Equipment1 10,000         10,000         10,000         10,000         10,000         10,000         60,000            SOG Vehicles2 40,000         40,000         40,000         40,000         40,000         40,000         240,000          Police Special Projects Sum 50,000         50,000         50,000         50,000         50,000         50,000         300,000          Storm Capital City Culverts1 50,000         50,000         50,000         50,000         50,000         50,000         300,000          Collection Systems2 50,000         50,000         50,000         50,000         50,000         50,000         300,000          Storm Drainage Replacement Program3 120,000       120,000       120,000       120,000       120,000       120,000       720,000          Kitsap Way Culverts4 75,000         450,000       525,000          Eagle Ave Storm Drain5 75,000         500,000       575,000          Eastpark Stormwater Outfall6 300,000       550,000       850,000          11th St. Pl & Washington Outfall7 100,000       150,000       250,000          Brentwood Dr & Oyster Bay Culvert250,000       250,000          Marine Drive & Kelly Road Storm System50,000         250,000       300,000          Price Road Conveyance Replacement100,000       100,000          Westpark Oyster Bay Outfall at OB‐1150,000       800,000       950,000          Storm Capital Sum 770,000       1,870,000    370,000       470,000       620,000       1,020,000    5,120,000      Streets Pavement Preservation ‐ TBD1 500,000       500,000          Sidewalk Improvements2 25,000         250,000       500,000       250,000       500,000       250,000       1,775,000       Washington Ave Project3 100,000       1,550,000    1,650,000       4th Street Landscaping Replacement150,000       150,000          Access Ways in Dockside20,000         20,000            Armin Jahr Elementary Safe Routes to Schools400,000       400,000          Arsenal Way/Patton Ave Safety Improvements100,000       100,000          Arterial Streets Major Maintenance & Reconstruction2,200,000    2,200,000    2,200,000    2,200,000    2,200,000    11,000,000    Bremerton HWY Safety Improvements120,000       600,000       720,000          Gorst Sinclair Trail100,000       100,000          Harrison District Traffic Circulation Improvements10,000         10,000            Kitsap Way to Harlow Drive Intersection40,000         40,000            Local Street Major Maintenance & Reconstruction3,500,000    3,500,000    3,500,000    3,500,000    3,500,000    17,500,000    Marine Drive NMT Improvements100,000       100,000          * Major maintenance Department Project TitleRank 2014 2015 2016 2017 2018 2019 Grand TotalNaval Ave Road Diet50,000         50,000            Oyster Bay Ave Improvements300,000       300,000          Shore Drive Shared Use Path40,000         40,000            Signal System Upgrades200,000       200,000       200,000       200,000       200,000       1,000,000       SR 303 Corridor Improvements ‐ Burwell to Riddell250,000       2,000,000    700,000       4,000,000    1,000,000    7,950,000       Street Lighting on Pine Road100,000       100,000          Street Lighting on Ricky Road40,000         40,000            Traffic Calming30,000         30,000         30,000         30,000         30,000         150,000          Werner Road Widening & Signal Improvements3,000,000    3,000,000       Streets Sum 625,000       8,660,000    9,030,000    6,880,000    10,430,000 11,070,000 46,695,000    Waste Capital Machinery/Equipment ‐ Utility Operations Manager*1 20,000         20,000         20,000         20,000         20,000         20,000         120,000          WWTP and Pump Station Improvement Program2 350,000       350,000       700,000       700,000       700,000       700,000       3,500,000       Metering System Upgrade*3 250,000       250,000       250,000       250,000       216,000       216,000       1,432,000       Digester Heat Exchanger #1 & #2 Replacement4 100,000       100,000          Biofilter Upgrade5 1,200,000    1,200,000       Substandard Main Replacement Program6 350,000       350,000       350,000       350,000       350,000       350,000       2,100,000       CIPP Repair of Failing Sewers7 75,000         525,000       600,000          Replace CW2 Pumps8 250,000       250,000          Metal Storage Warehouse9 50,000         50,000            Saltwater Infiltration Elimination10 75,000         75,000            Emergency Generator or Installation at EB311 50,000         50,000            Emergency Generator or Installation at OB612 50,000         50,000            Identify Grit Source Removal from Beach Lines13 150,000       150,000          WA Ave Sewer Replacement14 2,000,000    500,000       2,500,000       Sheldon Blvd Sewer Replacement & CE3 Upgrade15 1,000,000    1,000,000       Oyster Bay Beach Sewer16 250,000       1,000,000    1,250,000       Abandon Beach Sewer North of Manette Bridge200,000       2,000,000    2,200,000       Beach Main & Critical Force Main Cleaning75,000         200,000       200,000       200,000       200,000       875,000          Cherry Ave SS25,000         25,000            * Major maintenance Department Project TitleRank 2014 2015 2016 2017 2018 2019 Grand TotalCIPP Line Existing 54" SC Under Secondary Clarifier250,000       250,000          East & West Bremerton UGA Sewerage ULID Development50,000         50,000            East & West Bremerton UGA Sewerage ULID Development Design & Construction2,000,000    2,000,000    4,000,000       ESTP Outfall100,000       450,000       550,000          Grout Annular Space of SW Bremerton FM200,000       200,000          Improvement Between Schley & Fir Street50,000         50,000            Improvement on Homer Jones50,000         50,000            KL1 Infrastructure300,000       300,000          Phinney Bay & Ostrich Bay SS Extension75,000         1,500,000    1,575,000       Primary Clarifier #1 & Drive Replacement100,000       100,000          Primary Effluent Line Rehabilitation400,000       400,000          Recoat Aluminum Covers on Primary Clarifiers and Biofilter275,000       275,000          Replace Drives on RAS Pumps100,000       100,000          Replace or Rehabilitate 10" SS Under Secondary Clarifier150,000       500,000       650,000          Replace RAS Pumps275,000       275,000          Secondary Clarifier #1 & 2 Drive Replacement150,000       150,000          SKIA Sewer Design & Construction ‐ ULID725,000       4,750,000    5,475,000       Storage Warehouse at WWTP450,000       450,000          Surge Tank Repair & Hypo Tank Replacement75,000         75,000            Tracyton Beachmain Capacity Analysis & Design500,000       500,000          Upgrade SCADA150,000       150,000          Wastewater Reuse250,000       250,000          Westside WWTP Outfall150,000       2,500,000    2,650,000       Waste Capital Sum 6,220,000    4,720,000    5,520,000    11,020,000 4,136,000    4,436,000    36,052,000    Water Capital Machinery & Equipment ‐ Water Resources1 125,000       125,000       125,000       125,000       125,000       125,000       750,000          Machinery & Equipment ‐ Utility Operations Mgr2 20,000         20,000         20,000         20,000         20,000         20,000         120,000          Machinery & Equipment ‐ Forestry3 20,000         20,000         20,000         20,000         20,000         20,000         120,000          Taps4 70,000         70,000         70,000         70,000         70,000         70,000         420,000          * Major maintenance Department Project TitleRank 2014 2015 2016 2017 2018 2019 Grand TotalMeter Replacement*5 230,000       200,000       200,000       200,000       200,000       200,000       1,230,000       Meter Replacement Large*6 100,000       100,000       100,000       100,000       100,000       100,000       600,000          Fire Hydrants*7 20,000         20,000         20,000         20,000         20,000         20,000         120,000          Forestry Rd Maintenance, Bridges & Abandonment8 250,000       20,000         20,000         290,000          Substandard Water Main Replacement9 700,000       200,000       200,000       200,000       700,000       200,000       2,200,000       Distribution Main Improvements10 300,000       300,000       300,000       300,000       300,000       300,000       1,800,000       Anderson Creek Groundwater Rule CT Compliance11 150,000       150,000          Metering System Upgrade12 83,000         83,000         83,000         83,000         332,000          Scada Upgrade*13 100,000       100,000       200,000          Reservoir Coatings*14 110,000       240,000       240,000       240,000       240,000       240,000       1,310,000       Warren Ave Bridge Main Seismic Upgrade15 10,000         10,000            Anderson Creek Water Main16 30,000         120,000       150,000          Pressure Relief Valves17 75,000         75,000         75,000         225,000          Casad Dam Electrical Upgrade18 40,000         40,000            Property Purchase ‐ Well 9 Re‐Drill19 100,000       100,000          Emergency Source Upgrade20 100,000       100,000          Oyster Bay Public Works Consolidation21 220,000       220,000          Jarstad Park ‐ Interpretive/Facilities Improvements22 10,000         10,000            Rental House at Reservoir No. 4 Demo23 20,000         20,000            24" TM at Res 4 Outlet150,000       1,500,000    1,650,000       Anderson Creek Disinfection to Hypo250,000       250,000          Caustic Tank Replacement at CCF100,000       100,000          Construction of Additional W256 Water Storage100,000       100,000          Decommission Twin Lakes Valve50,000         50,000            Hardening of Casa Dam Overflow200,000       200,000          Marine Drive Watermain150,000       1,000,000    1,150,000       McKenna Falls Channel Modification150,000       150,000          Redundancy 24" C Street from Oyster Bay to National250,000       250,000          Replace Traveling Screens at McKenna Falls Intake250,000       250,000          * Major maintenance Department Project TitleRank 2014 2015 2016 2017 2018 2019 Grand TotalReservoir 8 Drain30,000         30,000            Sherman Heights Watermain Replacement150,000       750,000       900,000          W517 Zone (POB) Capacity Evaluation and Upgrades100,000       100,000          Well 18 Pump and Motor100,000       100,000          Well 1R Upgrades200,000       200,000          Well 22 Pump and Controls/PS 17200,000       200,000          Water Capital Sum 2,883,000    2,443,000    3,323,000    2,528,000    2,645,000    2,375,000    16,197,000    Grand Total 13,378,167 20,828,950 23,549,154 24,153,680 20,618,008 20,117,898 122,645,860  * Major maintenance Vehicle No. Department Description Replacement Cost Salvage Value Mileage Replacement 0019 401 03 Chevrolet 3500 50,000 2,200 97,000 F550 W/svc body 0076 401 2000 Jeep Cherokee 28,000 2,000 81,000 Small 4x4 SUV 0396 451 1988 Chevrolet 3500 4X2 w/ service body 50,000 Dept. to fund 167,000 F450 w/svc body 71549 001-20 07 Ford Crown Victoria 44,000 2,000 86,000 2014 Chev Caprice 71552 001-20 07 Ford Crown Victoria 44,000 2,000 105,000 2014 Chev Caprice 71550 001-20 07 Ford Crown Victoria 44,000 2,000 107,000 2014 Chev Caprice 1885 001-51 99 Dodge 2500 P/U 24,000 2,000 89,000 ¾ ton 4x2 P/U 1857 001-51 01 Dodge Ram P/U 26,000 1,500 101,000 ¾ ton 4X2 P/U 1905 001-47 96 F350 service truck 100,000 10,000 No Longer suits 38,000 F550 w/ svc box and equipment needed for fleet work 3030 102 94 Tiger boom mower 90,000 10,000 10,000 hrs Like kind 3102 102 03 Von Arx Concrete Grndr 15,000 0 N/A Like kind TOTAL 11 Vehicles 515,000 31,700 Vehicle 0396 will be replaced in 2014 there are no replacement funds available Department will transfer $$ to ERR to purchase. The proposed “replacement” is subject to 2014 State Contract listing.