MEMORANDUM OF AGREEMENT
BETWEEN THE
DEPARTMENT OF the NAVY
AND
CITY OF BREMERTON
Ref (a) Declaration of the Record of Decision dtd 29 Apr
2005
(b) Quitclaim Deeds dtd 09 Feb 2006, 09 Aug 2006 and
17 May 2007
Encl: (1) Insp,ection Checklist
BACKGROUND
r
Whereas, Operable Unit (OU D), hereinafter referred to as`
the "Property", was part of the Bremerton Naval Complex (BNC), a
facility listed on the National Priorities List (NPL) under the
Comprehensive Environmental Response, Compensation and Liability
Act (CERCLA);
Whereas, Property soil was found to contain chemical
contaminants above levels allowed by Washington State
regulations, but not considered a principal threat waste as
defined by U S. Environmental Protection Agency, hereinafter
"EPA", as the contaminant levels were not found to pose an
unacceptable risk to construction workers or park users,
Whereas, the Department of the Navy, hereinafter the "Navy",
and EPA selected a remedial action for the Property that was
documented in the Declaration of the Record of Decision (ROD),
reference (a), that included installation of an impermeable and
semi-permeable cap on the Property that was designed to prevent
contaminant migration from soil (and groundwater) into the
ad�acent marine environment of Sinclair Inlet, groundwater
monitoring, shoreline protection and institutional controls,
Whereas the Navy began implementation of the ROD in June
2005 and with completion in December 2006;
Whereas, the Property consisted of four Parcels, A-D which
were transferred by quitclaim deeds, reference (a) to the City
of Bremerton, hereinafter the "City", as follows �
1. Parcels "A" and "B" on February 9, 2006,
2. Parcel "D" on August 9, 2006; and
N68742-20100913-0058
3. Parcel "C" on May 17, 2007,
Whereas the quitclaim deeds, reference (b), to the Property
included inter alia a provision limiting the City from the
following, except as otherwise provided for in the Restrictive
Covenant:
1. Using the Property for other than recreational
purposes,
2 Taking or using groundwater for a purpose except
monitoring,
3. Engaging in any activity on the Property that may
result in a release or exposure to the environment
of the contaminated soil that was contained as �
part of the remedial action for the Property or
create a new exposure pathway,
Whereas the City may engage in activities on the Property
that may interfere with the remedial action, operation and
maintenance, or monitoring, provided that the City obtains the
prior wrltten approval of the EPA Region 10 and Washington
Department of Ecology (WDOE) sixty (60) days prior to execution
of work and provides a copy of the written approvals within
thirty (30) days of receipt to the Navy, per reference (b);
Whereas, in conducting construction activities on the
Property, the City is required to comply with certain
requirements set forth in Exhibit D of the quitclaim deeds,
reference (b);
Whereas the City has developed the Property as the Bremerton
Harborside Fountain Park, the Puget Sound Navy Museum and Puget
Sound Naval Shipyard (PSNS) Memorial Plaza;
Whereas, the Parties desire through this Memorandum of
Agreement to formally set forth their roles and responsibilities
in order to provide timely and accurate
exchanges of lnformation that will serve to facilitate the
provisions of the quitclaim deeds, reference (b), and promote
the protectiveness of the remedy;
NOW THEREFORE the Parties agree as follows.
I ROLES AND RESPONSIBILITIES•
2 N68742-20100913-0058
1. The City of Bremerton shall:
a Annually review their pro�ect records for the
Property and inspect the Property to document
site conditions and conformance to
' institutional controls using the checklist
contained in enclosure (1),
b. Provide the annual executed checklist to the
Navy no later than the 15 of May of each
calendar Year;
c Provide a copy of any EPA or WDOE approval to
conduct construction activities on the Property
to the Navy within thirty (30) days of receiving
approval as required by reference (b)
2 The Department of Navy shall
a Use the annual checklist provided by the City
pursuant to paragraph 1(a) above, to support
reporting requirements under CERCLA as set
forth in the ROD (reference (a)) and in
preparation of Five Year Reviews required under
CERCLA.
II PROJECT MANAGERS
The Navy and the City shall each designate a project manager
as the single point of contact for coordinating all activities
under this Memorandum of Agreement. Until otherwise changed by
written notice to the other Parties, the following individuals
are designated as the pro�ect managers:
For the Navy For the City:
Remedial Pro�ect Manager Director Parks & Recreation
1101 Tautog Circle City of Bremerton, Washington
Silverdale, WA 98315 680 Lebo Boulevard
(360) 315-2804 Bremerton WA 98310
(360) 473-5752
III TERMINATION, DURATION, MODIFICATION, REVIEW
1. Any Party to this Memorandum of Agreement may
propose termination by providing a ninety (90) day written
notice to the other parties and EPA Region 10.
3 N68742-20100913-0058
2. Except as provided above, this Memorandum of
Agreement ehall remain in effect for a period not to exceed six
(6) years. Al2 parties shall conduct a review of thie
Memorandum of Agreement every three (3) yeare to evaluate ite
effectiveness and determine any need for modification of the
terms, including attachments. At the conclusion of the six (6)
year period, the partiea may negotiate and reissue a new
Memorandum of Agreement. Any modificatione to the terme of the
Memorandum of Agreement will be in writing and mutually agreed
to by all the Parties.
3. This Memorandum of Agreement becomes effective
upon eignature by all parties.
IV . SIC3NATORIFS :
TH� CITY 08 8Rffi�RTON
� � DATL : / �T .3
Patty L
Mayor, ty of Bremerton
T88 DEPART�NT 08 NAVY
M. DAWSON, Captain, USN
,ding Of f icer
Baee Kitsap
DATB : � 2 � � �
np,T$ : `� r�
fl:\Legal\Legal\Filee\Curreat Active Files\Harboreide Pask City-Navy A�U\I�U-2013.docx
M. K. RICH
Rear Admiral, U.S. Navy
Commander, Navy Region Northwest
4
DATE: V �
N68742-20100913-0058
DAVID R. 3LU3HER
Comptroller
Commander, Navy Region Northweat
Enclosure (1)
HARBORSIDE FOUNTAIN PARK
INSTITUTIONAL CONTROLS
ANNUAL REPORT
Backqround
The purpose of this annual report is to document on-going compliance with deed
restrictions associated with properties conveyed to the City by the US Navy for the
Harborside Fountain Park This report shall be submitted to the Navy's Pro�ect
Manager no later than Mav 15 of each calendar year in compliance with the
Memorandum of Agreement dated <DATE> Use restrictions are defined in the three
Quitclaim Deeds used to transfer the property to the City, which read as follows
1 Except as otherwise provided for in this Restrictive Covenant the Owner shall not
a Use the Property for any uses other than recreational Recreational use is
defined as walking, viewing, nature watching, playing, entertainment, festivals, markets,
concerts, museum and park food services social activities museum use and related
activities, movies, picnicking, exercising, relaxing and all other activities reasonably
associated with park, museum, and public open space
b Take or use groundwater for any purpose except monitoring
c Engage �in any activity on the Property that may result in the release or
exposure to the environment of the contaminated soil that was contained as part of the
Remedial Action for OU-D, or create a new exposure pathway Some examples of
activities that are prohibited in the capped areas include drilling, digging, place any
ob�ects or use of any equipment which deforms or stresses the surface beyond its load
bearing capacity, piercing the surface with a rod, spike or similar item, bulldozing or
earthwork
2 Nofinrithstanding any other provision of this Restrictive Covenant, Owner may
engage in activities on the Property that may interFere with the Remedial Action,
operation and maintenance, or monitonng provided that it obtains the prior wntten
approval of the EPA Region X and WDOE 60-days prior to execution of the work
Owner shall provide Navy with a copy of the written approvals within 30-days of receipt
3 In conductmg construction activities on the properiy the owner shall comply with
requirements set forth in Exhibit "D" as described on the last page of this enclosure
For emergency response requiring immediate action the City, the Navy and EPA have
agreed the City may take such action it deems necessary, and will notify all points of
contact listed below within 10-days of the emerqent condition The parties have further
agreed the City may perForm routine planting and irrigation maintenance with ground
disturbance less than 18-inches in diameter and 18-inches in depth without advance
written approval or notice
Page 1 of 1 Enclosure 1
Points of Contact
For the Navy
Remedial Pro�ect Manager
1101 Tautog Circle
Silverdale, WA 98315
(360) 315-2804
ANNUAL REPORT
Date of last annual report
Date of this annual report
For the EPA
Remedial Pro�ect Manager
1200 Sixth Avenue
Seattle, WA 98101
(206) 553-6635
Name and Title of person completing the report
Contact information for person completing the report
Address
Telephone
E-mail
ONTROL OF THE PROPER
For WDOE
Site Manager
PO Box 47600
Olympia, WA 98504
(360) 407-6161
Confirm that no conveyance of interest (sale, lease, easement, etc ,) of any part of the
property to another entity has occurred, or is anticipated to occur
No conveyance of interest has, or is anticipated to occur
The City intends or anticipates it may convey interest in the property _
If yes, did conveyance documents restrict property uses and activities consistent with
Restrictive Covenant�
If mterest �n the property may be conveyed, provide a statement describing the
proposed conveyance (use attachments as needed)
Has usage of the site (from a park) changed in any manner, or is any change in usage
of any part of the site anticipated�
Yes
No �
If yes, provide a statement identifying the proposed or existing change in site usage
(use attachments as needed)
Page 2 of 2 Enclosure 1
UTURE ACTIVITIES�'PLANNED' FOR THE SI�'
Is any construction (beyond routine fountain maintenance, tree/plant replacement or
irrigation system maintenance within existing planting areas) proposed to occur at
Harborside Fountain Park within the next 5-years�
Yes
No
If yes, will the construction activity include excavation, or other work that could
penetrate the park's surface or use groundwater or place a load on the park's surface
that could deform or otherwise compromise the cap�
Yes
No
If yes, provide a statement of scope and schedule to initiate coordination with the
Department of the Navy, EPA, and WDOE (use attachments as needed)
CTIVITIES PERFORMED>SINCE �AST ANNUAL'REPOR �
Did any issue occur on the site during the last reporting period that required emergency
excavation, groundwater use, or other work that could have penetrated or deformed the
cap�
Yes
No
If yes, describe the issue, and confirm the EPA, Navy and WDOE were notified within
10-days of emergent condition
Was groundwater used for any purpose during this reporting period?
Yes
No
If yes, attach documentation of prior approvals obtained, and the purpose of usage
Did any earthwork, excavation or drilling (including tree replacement, irrigation
maintenance, or other operation and maintenance activities greater than 18-inches in
diameter, or 18-inches deep) occur during this reporting period�
Page 3 of 3 Enclosure 1
Yes
No
If yes, attach documentation of prior approvals obtained, and confirm the work was
completed following the attached Construction Requirements (Exhibit D from the
Quitclaim Deeds) that describes procedures to be followed to prevent release of
contaminated soils or groundwater to the environment, and confirm that no soils were
removed from the park site
Did any work occur at the site that may have deformed the cap due to excessive loads�
Yes
No
If yes, attach documentation of prior approvals obtained and attach photographs and
outline procedures and communication that occurred to ensure the work was
coordinated with the Navy, WDOE, and/or the EPA
EPORT tON� CONDITION� OF EXISTING UTILITIES ON THE SIT
Have any issues been identified on any storm drain lines crossing the site since the last
inspection�
Yes
No
If yes, describe the issues and proposed actions to be taken by the City to address the
issues
Have any issues been identified on any water lines (fountain water piping or irrigation
piping), including changes in typical water usage since the last inspection�
Yes
No
If yes, describe the issues and proposed actions to be taken by the City to address the
issues
Page 4 of 4 Enclosure 1
EXHIBIT D FROM QUITCLAIM DEEDS
(AF No 's 200710110379, 200608110319, & 200603080009)
CONSTRUCTION REQUIREMENTS
1) Native soil (soil not imported and located under the protective remedy) shall be
managed such that it does not destroy the integrity of and or contaminate the protective
remedy
2) The construction site shall be managed such that water (natural or anthropogenic) in
contact with the native soil does not migrate off site or cause additional groundwater
flow Dust should be suppressed, leachate collected and treated, and storm water
runoff directed to prevent contact with the native soil If during construction water must
come in contact with the native soil it should be collected and stored for analysis and
treatment Specifically, water accumulating within an excavation should be collected
and water should not be directed into a trench for containment and allowed to charge
the surrounding soil (recharge the groundwater more than remedy naturally allows)
3) Imported soil shall be sampled to insure it is clean
4) Soil shall not be exported offsite except for disposal Soil to be disposed of shall be
designated per the requirements set forth in Chapter 173-303, WAC Dangerous Waste
Regulations Excavated soil to be reused onsite or designated for disposal should be
stockpiled per the following requirements
a Soil will be' accumulated as near to the excavation as practicable
b An impervious sheet of plastic that has a minimum thickness of 10 mil will underlie
the soil
c A containment berm will be constructed around the stockpile using clean coarse
aggregate or eco-blocks to the stockpile underlain impervious layer The berm will be
constructed to prevent water from running under and prevent leachate from the
stockpiled soil from discharging If the soil is moist enough that leachate has formed, a
leachate collection system within the bottom layer of the soil must be placed between
the stockpiled soil and the bottom impervious layer
d The edges of the underlay plastic for the pile must be laid over the top of the berm
and secured to prevent water from running under the soil stockpile
e An impervious continuous sheet of plastic of minimum thickness of 10 mil will be
placed over the stockpile and the outside of the berm to direct run-on away from the
stockpile
f The stockpile cover will be secured to ensure protection from wind
g The stockpile will be covered and secured at all time except when adding or
removing soil or taking samples
h The stockpile covers will be inspected daily to ensure that the plastic is covering
the stockpile and there is no run-on and run-off the stockpile
R\Legal\Legal\Contracts\PARKSWIOU Navy and City for Park Properties - Checklist docx
Page 5 of 5 Enclosure 1