Loading...
HomeMy WebLinkAboutESTATE OF NIKKI C. MENCONI REIMBURSEMENT AGREEMENT COME NOWS LAVONA L MILLS, the Personal Representative of the Estate of NIKKI C MENCONI a /k/a NIKKI C DEWEY, pending in the Superior Court of the State of Washington for Kitsap County, under Cause No 13 -4- 00113 -5, who hereby agrees with the CITY OF BREMERTON that the work described on the OLYMPIC ELECTRICAL CONTRACTORS' Proposal attached hereto and incorporated herein by this reference, can be performed upon the Estate's real property located at 515 Fourth Street, Bremerton, Kitsap County, Washington It is specifically understood that the CITY OF BREMERTON is contracting with OLYMPIC ELECTRICAL CONTRACTORS for the performance of this work and will pay the Contractors for it It is also understood that 62 5% of the total cost of the project will be borne by the CITY OF BREMERTON and that the Estate's total liability will be not more than $1,96391 In the event the Estate has not repaid the CITY OF BREMERTON for the $1,963 91, the CITY OF BREMERTON is, by this document, authorized to claim a lien against the premises of indefinite duration for that amount DATED this o day of March, 2013 ESTATE OF NIKKI C. MENCONI, a /k/a NIKKI C. DEWEY: P � By lblk-� — - - -- - -- LAVONA L MILLS Personal Representative CITY OF BREMERTON: B Its AJ /f1 V 0 g REIMBURSEMENT AGREEMENT s \jIc \mencom \bremenon agr031813 i i I ® � y 1111 Y111 P 0 14% ELECTRICAL CONTRACTORS License# OLYMPEC945LA PO Box 2268 Port Orchard, WA 98366 Phone 360 9810011 Proposal To City of Bremerton Date March 7, 2013 3027 Olympus Drive Phone 360 373 6689 Bremerton, WA 98310 Email ned lever @ci bremerton wa us Invoice# Per your request, we submit pricing and specifications for the above referenced project as follows PROJECT 515 4th ST Extend 2 inch conduit from underground to new meter bases to feed existing service panels 1) Install 30ft of 2 inch SCH 80 PVC conduit 2) Install 125ft of 250/250/ 3/0 wire 3) Install 2 new meter bases ** Combo meter pack is a 2 week lead time. 4) Provide straps, supports and hardware 5) Convert existing panels into sub - panels 6) Permit Material $ 1,450 00 Labor $ 2,500 00 Tax $ 339 70 Permit $ 97 40 Total. $ 4,387.10 Specific Exclusions *Due to the current market conditions, this proposal is valid for 14 days after issuance Contracts not signed within 14 days are subject to pricing revisions Page 1 of 2 Thank you for considering Olympic Electrical Contractors for your projects I look forward to your authorization on the above referenced project If you have any questions or if I can be of further assistance, please contact me at 360 876 7650 Sincerely, EMAILED March 7, 2013 Ty Loper Date Owner /Master Electrician Acceptance of Proposal The prices, terms and conditions listed are satisfactory for the work described You hereby authorize Olympic Electrical Contractors to perform the work as outlined above Any alterations from the above specifications may involve additional costs and will be executed only upon written notice Owner /Contractor /Representative Date Terms and Conditions 1) Olympic Electrical Contractors agrees to perform all work in a careful, professional manner and to furnish only materials of good quality 2) All work will be performed dunng normal business hours, 7 00 AM to 4 PM, Monday through Friday unless otherwise noted in the scope of work as described above 3) Payment will be made in full within 30 days of invoice Any balance remaining unpaid after 30 days shall incur a finance charge computed at a rate of 150% per month (equivalent to an annual percentage rate of 18 0 1o) 4) All agreements are contingent upon strikes, accidents, or delays beyond Olympic Electrical Contractor's control Page 2 of 2 PUGL !- IPi SOUND ENERGY PAYEI,GQ INC A (Manta C011PI.Y 1= ebivary 13, 2013 Nikki Menconi 619 4th St Bremerton, WA 98337 RE Non - Residential secondary electric service to 619 4th St Bremei ton, WA 98337 (PSE Job #587022769) In accordance with Puget Sound Energy's Tariff G, Schedule 85, customers requesting electric Non - Residential underground secondary voltage service connections are 'Subject to the Customer paying an estimated charge based on the Company's cost of making the connection(s) " The estimated cost for connecting the underground electric service at the above $ 68872 This quote is based on the following information that was provided by you on your application for service Base Fee for connection _ _ $ 42900 Additional Runs @ $99 00 per run $ 9900 Additional 1 rip fee, foi customer requested additional trip $ - PSE Real Estate, Easements, Permits, etc $ - Complex engineering, outage coordination, & switching orders @ $12.8 00 per hr _ $ 12800 Requested overtime,stand by fee,flagging charges or PSE Serviceman $ - Sales Tax & overheads (if applicable) _ $ 3272 If you request a change in the number of conductors that need to be connected, request that work be performed outside of normal working hours, request additional trips than those discussed or have other changed conditions not indicated by other information that you have provided, we reserve the right to adjust this quote based on those changed conditions This quote is valid for 90 days from the above date Upon your signed acceptance and return of this quote and completion of the connection work, you will receive an invoice for the above amount from Puget Sound Energy, which is payable in thirty days If you have any questions please contact me at 253- 606 -6099 Sincerely, ( -- F ! i Mike Klapperich Customer Signature Project Manager I agree to the price and conditions as stated above Potelco /PSE Representative 22884 Ryen Dr NW Billing address Poulsbo, WA 98370