Loading...
HomeMy WebLinkAbout3191 RESOLUTION NO. 3191 A RESOLUTION of the City Council of the City of Bremerton, Washington, establishing fines and penalties regarding abandoned properties WHEREAS, the City Council desires to amend Community Development - Rate Table C to establish fines and penalties relating to abandoned properties, NOW THEREFORE THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS SECTION 1. Rate Table amended Fines and penalties set forth in Community Development - Rate Table C as established by Resolution No 3185 are hereby amended and reestablished herein by this Resolution by adding a new section 7 entitled "Abandoned Properties Fines & Penalties" and making certain corrections to Exhibit 1 of Rate table C as set forth in the amended Community Development - Rate Table C, attached hereto and incorporated herein by reference SECTION2. Effective Date of Section I The establishment of fines and penalties set forth in Section 1 above shall be effective August 1, 2013 SECTION 3. Severabihbt If anyone or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect SECTION 4. Effective Date This Resolution shall take effect and be in force immediately upon its passage PASSED by the City Council of the City of Bremerton, Washington this day of 6rt, , 2013 GROG WH ER, Council President AS TO FORM AINT ROGER A LUBOVICH, City Atto SHANNON CORIN, City Clerk R \Legal \Legal\Res utons\Finance\2013 Rates and Fees Tables\2013 Resolution amending Rate Table C doc 2013 Rates and Fees — Rate Table C COMMUNITY DEVELOPMENT — RATE TABLE C All Rates Listed are "Not To Exceed" Fees C. DEPARTMENT OF COMMUNITY DEVELOPMENT RATE 1. SUBDIVISIONS Preliminary Short $1000 + $150 per lot Preliminary Formal Plat/Binding Site Plan $2500+ $150 /lot (1 -100 lots) $100 /lot (101 -200 lots) Final Short $75 /lot (201 + lots) $630 + $40 /lot Final Formal Plat/Binding Site Plan $945 + 40 /lot 2. SHORELINE MASTER PROGRAM Substantial Development Permit $1,300 Conditional Use Permit — Type II $850 Conditional Use Permit — Type III $1750 Shoreline Variance $1750 Permit Revision $325 Shoreline Exemption $100 3. STATE ENVIRONMENTAL POLICY ACT (SEPA) Checklist $320 Environmental Impact Statement Review /Adoption $650 + additional cost of expertise 4. APPEAL (to Hearing Examiner) $350 5. PRE - APPLICATON CONFERENCE $100 6. ABATEMENTS Dangerous Building $900 + Direct Service and Supply Cost Garbage & Weed $640 + Direct Service and Supply Cost 7. ABANDONED PROPERTIES FINES & PENALTIES Failure to Re ig ster $1,000 + $100 per day Failure to Inspect, Maintain, and/or Secure $1,000 + $100 per day -78. BUILDING PERMIT FEES Refer to Exhibit 1 99. PLAN REVIEW FEE 65% of the building pernut fee as set forth in Exhibit 1 110. ESTABLISHED "BASIC" PLAN REVIEW Pursuant to DCD policy 50% of Plan Review Fee Resolution No 3191 COMMUNITY DEVELOPMENT — RATE TABLE C All Rates Listed are "Not To Exceed" Fees RATE 4-011. MECHANICAL PERMIT FEES Residential Refer to Exhibit 2 Commercial / Non - Residential / Multifamily Valuation and Refer to Exhibit 1 4-4-12. PLUMBING PERMIT FEES Residential Refer to Exhibit 3 Commercial / Non - Residential / Multifamily Valuation and Refer to Exhibit 1 4-313. GRADING PERMIT AND PLAN REVIEW FEES Refer to Exhibit 4 4314. ZONING ORDINANCE Ordinance Amendments Text $740 Rezone (Map Amendment) $740 Variance Administrative $325 Public Hearing/Single Family $500 Public Hearing/Other $1750 Development Agreements $1600 Conditional Use Permit Single Family Residential Type 1I $350 Single Family Residential Type 111 $500 Commercial / Non - Residential / Multifamily — Type 11 $850 Commercial / Non - Residential / Multifamily — Type 111 $1750 Non - Conforming Use Determination $275 Director's Code Interpretation $175 4415. COMPREHENSIVE PLAN Text or Map Amendment $1500 Combined Text and Map Amendment $2500 4-516. SITE PLAN REVIEW Commercial / Non - Residential / Multifamily — Type II $500 4-617. SITE DEVELOPMENT PERMIT $500 (Fee waived if concurrent with Site Plan Review) Resolution No 3191 COMMUNITY DEVELOPMENT — RATE TABLE C All Rates Listed are "Not To Exceed" Fees RATE 4-718. MULTIFAMILY TAX EXEMPTION Application $1500 4819. DESIGN REVIEW BOARD Conceptual Design Conference $500 Design Response Conference $500 4920. MISCELLANEOUS FEES Hourly Rate $5600 Stop Work Fee 100 % of permit fee Resolution No 3191 i COMMUNITY DEVELOPMENT — RATE TABLE C All Rates Listed are "Not To Exceed" Fees E°1 zAtbit A r COMMUNITY DEVELOPMENT RATE TABLE C EXHIBIT 1 BUILDING AND OTHER PERMIT FEES TOTAL VALUATION FEE $100 TO $500 00 $2600 $50100 TO $2,000 00 $26 00 for the first $500 00 plus $3 00 for each additional $100 00, or fraction thereof, to and including $2,000 00 $2,00100 to $40,000 $69 00 for the first $2,000 00 plus $11 00for each additional $1,000 00, or fraction thereof, to and including $40,000 $40,00100 to $100,000 00 $487 00 for the first $40,000, plus $9 00 for each additional $1,000 00, or fraction thereof, to and including $100,000 00 $100,001 00 to $500,000 00 $1,027 00 for the first $100,00 00 plus $7 00 for each additional $1,000 00, or fraction thereof, to and including $500,000 00 $500,00100 to $1,000,000 00 $3,827 00 for the first $500,000 00 plus $5 00 for each additional $1,000 00, or fraction thereof, to and including $1,000,000 00 $1,000,001 00 to 5,000,000 00 $6,327 00 for the first $1,000,000 00 plus $3 00 for each additional $1,000 00, or fraction thereof, to include $5,000,000 00 $5,000,00100 and over $18,327 00 for the first $5,000,000 00, plus $100 for each additional $1,000 00 or fraction thereof Other Inspections and fees 1 Inspections outside of normal business hours $56 00 per hour' (minimum charge — two hours) 2 Re- inspection fees assessed under provisions of this chapter shall be as follows (per inspection) $56 00 per hour' 3 Inspections for which no fee is specifically indicated $56 00 per hour' (minimum charge — one -half hour) 4 Additional plan review required by changes, additions or revisions to plans $56 00 per hour' (minimum charge — one -half hour) 5 For use of outside consultants for plan checlung and inspections, or both Actual CostS 6 Manufactured Home Setup Fee Bid Price valuation used in Exhibit 1 7 Moved Building Permit Fee (not including other required permits) $10000 8 Demolition permit Fee 3 cents per square foot, with a minimum charge of $5600 9 Energy Code Plan Review Surcharge for New Single Family Residences $5000 Or the total hourly cost to the jurisdiction, whichever is the greatest This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved A Actual costs include adnimistrarive and overhead costs Resolution No 3191 COMMUNITY DEVELOPMENT — RATE TABLE C All Rates Listed are "Not To Exceed" Fees EXHIBIT 2 MECHANICAL PERMIT FEES Permit Issuance and Heaters Fee 1 For the issuance of each mechanical permit $2350 2 For issuing each supplemental permit for which the original permit has not expired, been canceled or finaled $725 Unit Fee Schedule (Note The following do not include permit - issuing fee) 1 Furnaces For the installation or relocation of each forced -air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h (29 3 kW) $1480 For the installation or relocation of each forced -air or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h (29 3 kW) $1820 For the installation or relocation of each floor furnace, including vent $1480 For the installation or relocation of each suspended heater, recessed wall heater or floor - mounted unit heater $1480 2 Appliance Vents For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit $725 3 Repairs or Additions For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code $1370 4 Boilers, Compressors and Absorption Systems For the installation or relocation of each boiler or compressor to and including 3 horsepower (10 6 kW), or each absorption system to and including 100,000 Btu/h (29 3 kW) $1470 For the installation or relocation of each boiler or compressor over three horsepower (10 6 kW) to and including 15 horsepower (52 7 kW), or each absorption system over 100,000 Btu/h (29 3 kW) to and including 500,000 Btu/h (146 6 kW) $27 15 For the installation or relocation of each boiler or compressor over 15 horsepower (52 7 kW) to and including 30 horsepower (105 5 kW), or each absorption system over 500,000 Btu/h (146 6 kW) to and including 1,000,000 Btu/h (293 1 kW) $3720 For the installation or relocation of each boiler or compressor over 30 horsepower (105 5 kW) to and including 50 horsepower (176 kW), or each absorption system over 1,000,000 Btu/h (293 1 kW) to and including 1,750,000 Btu/h (512 9 kW) $5545 For the installation or relocation of each boiler or compressor over 50 horsepower (176 kW), or each absorption system over 1,750,000 Btu/h (512 9 kW) $9265 5 Air Handlers For each air - handling unit to and including 10,000 cubic feet per minute (cfin) (4719 L /s), including ducts attached thereto Note: This fee does not apply to an air - handling unit which is a portion of a factory- assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code $1065 For each air - handling unit over 10,000 cfm (4719 s) $1810 6 Evaporative Coolers For each evaporative cooler other than portable type $1065 7 Ventilation and Exhaust For each ventilation fan connected to a single duct $725 For each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit $1065 For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood $1065 Resolution No 3191 COMMUNITY DEVELOPMENT — RATE TABLE C All Rates Listed are "Not To Exceed" Fees 8 Incinerators For the installation or relocation of each domestic -type incinerator $1820 For the installation or relocation of each commercial or industrial -type incinerator $1450 9 Miscellaneous For each appliance or piece of equipment regulated by the Mechanical Code but not classed to other appliance categories, or for which no other fee is listed in the table $1065 For each gas piping system of 1 — 5 outlets $625 For each additional gas piping system outlet, per outlet $125 Other Inspections and Fees Inspections outside of normal business hours, per hour (minimum charge — two hours $49 50' Re- inspection fees assessed under provisions of this chapter shall be as follows (per inspection) $49 50' Inspections for which no fee is specifically indicated, per hour (minimum charge — one -half hour) $49 50' Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed (minimum charge — one -half hour) $49 50' 'Or the total hourly cost to the jurisdiction, whichever is the greatest This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved Resolution No 3191 COMMUNITY DEVELOPMENT — RATE TABLE C All Rates Listed are "Not To Exceed" Fees EXHIBIT 3 PLUMBING PERMIT FEES Permit Issuance 1 For issuing each permit $2000 2 For issuing each supplemental permit $1000 Unit Fee Schedule (in addition to items 1 and 2 above) 1 For each plumbing fixture on one trap or a set of fixtures on one trap (including water, drainage piping and backflow protection therefore) $700 2 For each building sewer and each trailer park sewer $1500 3 Rainwater systems — per drain (inside building) $700 4 For each cesspool (where permitted) $2500 5 For each private sewage disposal system $4000 6 For each water heater and/or vent $700 7 For each gas piping system of one to five outlets $500 8 For each additional gas piping system outlet, per outlet $100 9 For each industrial waste pretreatment interceptor including its trap and vent, except kitchen -type grease interceptors functioning as fixture traps $700 10 For each installation, alteration or repair of water piping and/or water treating equipment, each $700 11 For each repair or alteration of drainage or vent piping, each fixture $700 12 For each lawn sprinkler system on any one meter including backflow protection devices therefore $700 13 For atmospheric -type vacuum breakers not included in item 12 1 to 5 $500 Over 5, each $100 14 For each backflow protective device other than atmospheric type vacuum breakers 2 inch (51 mm) diameter and smaller $700 Over 2 inch (51 mm) diameter $1500 15 For each graywater system $4000 16 For initial installation and testing for a reclaimed water system $30 00' 17 For each annual cross - connection testing of a reclaimed water system (excluding initial test ) $30 00' 18 For each medical gas piping system serving one to five inlet(s)/outlet(s) for a specific gas $5000 19 For each additional medical gas inlet(s) /outlet(s) $500 Other Inspections and Fees 1 Inspections outside of normal business hours $30 00' 2 Re- inspection fee $3000 3 Inspections for which no fee is specifically indicated $30 00' 4 Additional plan review required by changes, additions or revisions to approved plans (minimum charge — one -half hour) $30 00' 'Per hour for each hour worked or the total hourly cost to the jurisdiction, whichever is greater This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of all the employee s involved I I Resolution No 3191 COMMUNITY DEVELOPMENT - RATE TABLE C All Rates Listed are "Not To Exceed" Fees EXHIBIT 4 GRADING PLAN REVIEW FEES 50 cubic yards (38 2 m or less No fee 51 to 100 cubic yards (40 m to 76 5 m 3 ) $ 2350 101 to 1,000 cubic yards (77 2 m to 764 6 m 3 ) $ 3700 1,001 to 10,000 cubic yards (765 3 m to 7645 5 m 3 ) $ 4925 10,001 100,000 cubic yards (7646 3 m to 76,455 m 3 ) $ 49 25 for the first 10,000 cubic yards (7645 5 m plus $24 50 for each additional 10,000 cubic yards (7645 5 m or fraction thereof 100,001 to 200,000 cubic yards (76,456 m to 152,911 $269 75 for the first 100,000 cubic yards m 3 ) ( 76,455 in), plus $13 25 for each additional 10,000 cubic yards (7645 5 in) or fraction thereof 200,001 cubic yards (152,912 m) or more $402 25 for the first 200,000 cubic yards (152,911 in), plus $7 25 for each additional 10,000 cubic yards (7645 5 m 3 ) or fraction thereof Other Fees: Additional plan review required by changes, additions or revisions to approved plans (minimum charge - one -half hour) $50 50 per hour' 'Or the total hourly cost to the jurisdiction, whichever is the greatest This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved GRADING PERMIT FEES' 50 cubic yards (38 2 m) or less $2350 51 to 100 cubic yards (40 m to 76 5 m) $3700 101 to 1,000 cubic yards (77 2 m to 764 6 m) $37 00 for the first 100 cubic yards (76 5 m 3 ) plus $17 50 for each additional 100 cubic yards (76 5 m or fraction thereof 1,001 to 10,000 cubic yards (765 3 m to 7645 5 m 3 ) $ 194 50 for the first 1,000 cubic yards (764 6 m), plus $14 50 for each additional 1,000 cubic yards (764 6 m or fraction ' thereof 10,001 to 100,000 cubic yards (7646 3 m to 76,455 $325 00 for the first 10,000 cubic yards (7645 5 m m plus $66 00 for each additional 10,000 cubic yards (7645 5 m or fraction thereof 100,001 cubic yards (76,456 m or more $919 00 for the first 100,000 cubic yards (76,455 m plus $36 50 for each additional 10,000 cubic yards (7645 5 in) or fraction thereof Other Inspections and Fees: 1 Inspections outside of normal business hours (minimu charge - two hours) $50 50 per hour m 2 Re- inspection fees assessed under provisions of this chapter shall be as follows (per inspection) $49 50 per hour 3 Inspections for which no fee is specifically indicated ( mimmum charge - one - half hour) $50 50 per hour 'The fee for a grading permit authorizing additional work to that under a valid permit shall be the difference between the fee paid for the original permit and the fee shown for the entire project 2 O the total hourly cost to the jurisdiction, whichever is the greatest This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved Resolution No 3191 i