Loading...
HomeMy WebLinkAbout5223 Contract Number: 5223 Vendor: PARAMETRIX Subject: Pacific Avenue Improvements Engineering Services Department: Engineering File Class: LEG 12 -1 Begin Date: 2/6/2013 End Date: 12/31/2014 Review Date: Vault Date: 2016 Comments: SA #1 7/9/13; SA #2 5/27/14 q// 71�nsPpol9M S p lemental A reement Organization and Address Agreement Inc. Number 02 4660 Kitsap Way, Suite A Bremerton, WA 98312 Original Agreement Number Attention: David Dinkuhn NA Phone: 360 - 377 -0014 Project Number Execution Date Completion Date 102160 2/6/2013 12/31/2014 Project Title New Maximum Amount Payable Pacific Ave Improvements Engineering Services $ 101,083.65 Description of Work WSDOT comments response, see Section 1, Scope of Work. The Local Agency of City of Bremerton desires to supplement the agreement entered into with Parametrix, Inc. and executed on 2/6/2013 and identified as Agreement No. NA All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: Addressing WS110T comments regarding Pacific Avenue, wnrk added to existing tack 06 C'.nnstrnctinn Fngineering_ Support, including rewriting the original MFF and angled a: rking memn and preparing a deviation request for the 1 1 th and Pacific intersection design_ II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: The amended enmpletion date is 19/31/9014 III Section V, PAYMENT, shall be amended as follows: U,593 65 is added to the contract budget fora new maximum payable amount of 9,1(11,(1R3_h5_ as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: — 8rGQY1f 0V T, • By: 1 5r7�44 Consultant Signature App ving Authority Signature E!?7zo DOT Form 140 -063 EF to Revised 9/2005 Exhibit E -1 Consultant Fee Determination - Summary Sheet (Cost Plus Fixex Fee ) Project: Pacific Avenue Improvements Engineering Services Direct Salary Cost (DSC): Classification Man Hours = Rate = Cost Project Manager (David Dinkuhn) 4 X $53.48 $213.92 Engineer IV (Jack Wright) 4 X $46.22 $184.88 Senior Engineer (Owen Kikuta) 12 X $55.68 $668.16 Accounting 1 X $26.95 $26.95 Total DSC = $1,093.91 Overhead (OH Cost -- including Salary Additives): OH Rate x DSC of 199.83 %x$ $1,093.91 $2,185.96 Fixed Fee (FF): FF Rate x DSC of 20 %X$ $1,093.91 $218.78 Reimbursables: Expenses $95.00 $95.00 Grand Total $3,593.65 Prepared By: D.Dinkuhn Date: 5/8/2014 DOT Form 140 -089 EF Exhibit E -1 Revised 6/05 Contract Number 5223 Vendor. PARAMETRIX Subject Pacific Avenue Improvements Engineering Services Department Engineering File Class: LEG 12 -1 Begin Date 2/6/2013 End Date- 6/30/2014 Review Date Vault Date 2016 Comments SA #1 7/9/13 I Adft Washington State W/Af Department of Transportation Sup Agreement Organization and Address p p g Parametnx, Inc Number Ol 4660 Kitsap Way, Suite A Bremerton, WA 98312 Original Agreement Number Attention David Dinkuhn NA Phone 360 - 377 -0014 Project Number Execution Date Completion Date 102160 2/6/2013 6/30/2014 Project Title New Maximum Amount Payable Pacific Ave Improvements Engineering Services $ 97,490.00 Description of Work Engineering Services during bidding and construction Please see attached Scope of Work. The Local Agency of City of Bremerton desires to supplement the agreement entered into with Parametnx, Inc and executed on 2/6/2013 and identified as Agreement No NA All provisions in the basic agreement remain in effect except as expressly modified by this supplement The changes to the agreement are described as follows 1 Section 1, SCOPE OF WORK, is hereby changed to read See attached Exhibit A -1 II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read The completion date remains the same 111 Section V, PAYMENT, shall be amended as follows $21.990.00 is added to the contract budget for a new maximum pgyahle amount of X97,490 00 as set forth in the attached Exhibit A, and by this reference made a part of this supplement If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action G By _ ` N L S Y u � By Ile4 T Consultant Signature Approvipepwinority Signature DOT Form 140-063 EF Date Revised 9/2005 EXHIBIT A -1 SCOPE OF WORK City of Bremerton Pacific Avenue Improvements Engineering Services Supplemental Agreement No. 01 INTRODUCTION This Scope of-Work (SOW) describes Parametrix's proposed tasks to provide engineering support during bidding and construction for the Pacific Avenue Improvements 6` Street to 11 Street protect This SOW consists of Supplement No 1 to our existing Local Agency Standard Consultant Agreement Dated February 6th, 2013 TASK 01 — MEETINGS, COORDINATION AND PROJECT MANAGEMENT — (SUPPLEMENT TO EXISTING TASK 01 PROJECT MANAGEMENT) Goal To continue to manage scope, schedule, and budget, and periodically communicate with the City to review project status Activities Specific work elements will include • Preparation of monthly invoices • Phone calls with the City to update progress as needed Deliverables Parametrix anticipates the following work products for this task • Routine correspondence, budget updates, status reports on progress of work, and invoices Assumptions The task budget is based on the following assumptions • Project management tasks will be performed through the project period, which is assumed will extend through June 30, 2014 • Project update calls will be attended by the Parametrix project manager City of Bremerton 233 - 1896 -112 Pacific Avenue Improvements 6 Street to I P Street 1 May 2013 Supplemental Agreement No 01 TASK 05 — REVISED 100 %, FINAL, AND BID SET PLANS, SPECIFICATIONS AND ESTIMATE (SUPPLEMENT TO EXISTING TASK 05) Objective: To prepare and submit Addenda 01 and 02 during the original bid period of April 11, 2013 through May 2, 2013, and prepare a revised Bid Package for a rebid during the period May 10, 2013 through May 31, 2013 Activities: The following activities performed as part of this task • Addendum 01 was prepared including revisions to 25 plan sheets to reflect the expansion of angle -in parking in front of the post office as directed by the City, relocation of the bus shelter from that location, and addition of Plan Sheet TI for temporary channelization • Addendum No 02 was prepared including revisions to the special provisions based on WSDOT comments and the addition of cut sheets for a third luminaire option • Revised Bid Documents were prepared for a re -bid including removal of the bus shelters and both bid alternates • Prepared revised Engineer's Cost Estimate Deliverables: The following deliverables are associated with this task • Addenda and Re -Bid Construction Documents TASK 06 — CONSTRUCTION ENGINEERING SUPPORT — (NEW TASK) Objective Provide construction engineering support as requested by the City during the construction phase of the project Activities The following activities may be performed • Following bidding, produce a Conformance Set of construction documents including contract documents, specifications, and drawings • Attend a pre - construction meeting with the City and Contractor • Attend protect meetings at the construction site as requested by the City • Review Contractor's submittal schedule for compliance with the specifications • Review Contractor work plans and reports and provide recommendations for approval or acceptance to the City City of Bremerton 233 -1896 -112 Pacific Avenue Improvements 6" Street to 11 m Street 2 May 2013 Supplemental Agreement No 01 • Review and respond to Contractor's material submittals, catalog cut sheets, and shop drawings for non - commercial items or items with non - standard specifications such as the stamped crosswalk and street tree receptacles • Respond to applicable Contractor's Requests for Information (RFIs) • Review completeness of Contractor's record drawings, draft modifications in AutoCAD and provided final record drawings sealed by a professional engineer licensed in the state of Washington • Conduct a site walk at substantial completion to assist the City in the punch list inspection Deliverables The following deliverables may be submitted under this task • Conformance Set of construction documents • Record Drawings • Hard copies and electronic copies of Parametrix's responses to material submittal, cut sheet, and shop drawing review • Hard copies and electronic copies of Parametrix's responses to work plans, reports, RFIs, and requests for change orders Assumptions The following assumptions apply • The Parametrix Project Manager will attend site meetings as requested by the City • Parametrix staff representing individual disciplines such as hardscape, transportation, or electrical will attend on -site meetings as appropriate and as requested by the City • For the Conformance Set, hard copies of the contract documents, specifications, and drawings will be provided as requested Conformance Set production will require an estimated 2 hours for the Parametrix Project Manager, 4 hours CADD Operator Labor, 2 hours of word processing, and 8 hours of Protect Coordinator labor • Review of Contractor's submittal schedule will require an estimated 1 hours • Contractor work plans or reports will be reviewed at an estimated 2 hours each • Parametrix will review and respond to shop drawing submittals at an estimated 2 hours each and material submittals at an estimated 1 hour each • Parametrix will review and respond to all RFI's as requested by the City For estimating purposes, it is assumed that RFI review and response will require 1 hour each City of Bremerton 233 - 1896 -112 Pacific Avenue Improvements 6' Street to I P Street 3 May 2013 Supplemental Agreement No 01 • Record Drawing review, CADD work, and production of the sealed set will require an estimated 16 hours CADD Operator Labor, 2 hours of Project Coordinator labor, and 2 hours for the Parametrix Project Manager This estimate assumes that up to twelve sheets will require modification The remaining 44 sheets will be reproduced and sealed only • Responses to RFIs will not require CADD Operator labor unless final plans have errors and omissions requiring corrections City of Bremerton 233 -1896 -112 Pacific Avenue Improvements 6" Street to 11 " Street 4 May 2013 Supplemental Agreement No 01 Budget Summary Task 01 Project Management 1 $1,000 Task 05 Revised 100 %, Final, and Bid Set Plans and Specifications $11,990 Task 06 Construction Engineering Support $9,000 TOTAL .......................................................................................... ............................... $21,990 NOTES: The estimated fees provided above were determined on a cost plus fixed fee basis and will not be exceeded without written authorization by the City A detailed breakdown of costs is provided in the attached Exhibit E -1 City of Bremerton 233- 1896 -112 Pacific Avenue Improvements a Street to I1 a Street I May 2013 Supplemental Agreement No 01 Exhibit A -2 Scope of Work (Task Order Agreement) Each item of work under this AGREEMENT will be provided by task assignment Each assignment will be individually negotiated with the CONSULTANT The amount established for each assignment will be the maximum amount payable for that assignment unless modified in writing by the AGENCY The AGENCY is not obligated to assign any specific number of tasks to the CONSULTANT, and the AGENCY'S and CONSULTANT'S obligations hereunder are limited to tasks assigned in writing Task assignments may include but are not limited to, the following types of work A Conduct traffic counts at additional intersection $1,10000 B Incorporated City water and sanitary sewer design into Bid Set, (4 sheets) $5,764 00 C Total (per attached Task T1) $6,864 00 D E F Task assignments made by the AGENCY shall be issued in writing by a Formal Task Assignment Document similar in format to page 2 of this exhibit An assignment shall become effective when a formal Task Assignment Document is signed by the CONSULTANT and the AGENCY, except that emergency actions requiring a 24 -hour or less response can be handled by an oral authorization Such oral authorization shall be followed up with a Formal Task Assignment Document within four working days, and any billing rates agreed to orally (for individuals, subconsultants, or organizations whose rates were not previously established in the AGREEMENT) shall be provisional and subject to final negotiation and acceptance by the AGENCY DOT Forth 140-089 EF Exhibit A -2 Revised 6/05 Formal Task Assignment Document Task Number T1 The general provisions and clauses of Agreement Executed 2/6/13 shall be in full force and effect for this Task Assignment Location of Project Bremerton, WA Project Title Pacific Avenue Improvements Engineering Services Maximum Amount Payable Per Task Assignment $6,86400 Completion Date June 30, 2014 Description of Work (Note attachments and give brief description) Consultant to perform additional services as directed and described under Task T1, according to attached Exhibit A -2 Task T1 is to be paid under Management Reserve Agency Project Manager Signature Date Oral Authorization Date See Letter Dated Consultant Signature Date Agency Approving Authority ,ate DOT Form 140 -089 EF Formal Task Assignment Revised 6/05 Exhibit E -1 Consultant Fee Determination - Summary Sheet (Cost Plus Fixex Fee ) Project Pacific Avenue Improvements Engineering Services - Supplemental Agreement No 01 Direct Salary Cost (DSC) Classification Man Hours = Rate = Cost Project Manager (David Dinkuhn) 60 X $4817 $2,89020 Engineer III (Dean Zavack) 5 X $3300 $16500 Designer III (Bob Kugen) 5 X $3667 $18335 Engineer IV (Jack Wright) 10 X $4202 $42020 Senior Engineer (Bob Franklin) 145 X $7000 $1,01500 CADD (S Rasmussen) 485 X $2620 $1,27070 CADD (K Braaten) 35 X $2500 $8750 CADD (J Peterson) 1 X $2500 $2500 Word Processing 155 X $3174 $49197 Accounting 5 X $2695 $13475 Project Support 6 X $2135 $12810 X $000 X $000 X $000 X $000 X $000 Total DSC = $6,81177 Overhead (OH Cost — including Salary Additives) OH Rate x DSC of 19983 %x$ $6,81177 $13,61196 Fixed Fee (FF) FF Rate x DSC of 1479 %x$ $6,81177 $1,00746 Reimbursables Expenses $55881 $55881 Grand Total $21,99000 Prepared B Date a DOT Form 140 -089 EF Exhibit E -1 Revised 6/05 Contract Number. Vendor: Sub�ect: Department File Class: Begin Date: End Date: Review Date Vault Date• Comments . E.'Yx.Ic3 PARAMETRIX Pacific Avenue Improvements Engineering Services Engineering LEG 12-1 2/6/2013 6/30/2014 2016 Local Agency ConsultanUAddress/Telephone Parametrix, Inc Standard Consultant Parametrix, Inc Agreement 4660 Kttsap Way, Suite A Bremerton, WA 98312 � Architectural/Engmeenng ATTN Dav�d Dmkuhn 360-377-0014 ❑ Personal Services A reement Number Pro�ect Title And Work Description Federal Aid Number Pacific Avenue Improvements Engmeermg Services Agreement Type (Choose one) Roadway, non-motorized transportat�on and stormwater �mprovements on Pacific Avenue ❑ Lump Sum between 6th and l lth Streets Lump Sum Amount $ � Cost Plus F�xed Fee Overhead Progress Payment Rate 199 83 °/a Overhead Cost Method DBE Partiapation ❑ Actual Cost ❑ Yes � No % Federal ID Number or Social Security Number ❑ Actual Cost Not To Exceed % 91-0914810 � Fixed Overhead Rate 14 79 % Do you require a 1099 for IRS? Completion Date Fixed Fee $ , ❑ Yes � No June 30, 2014 ❑ Specific Rates Of Pay Total Amount Authonzed $ 68,636 36 ❑ Negotiated Hourly Rate ❑ Provisional Hourly Rate Management Reserve Fund $ 6,863 64 ❑ Cost Per Unit of Work Maximum Amount Payable $ 75,500 00 Index of Exhibits (Check all that apply)• � Each�b�t A-1 Scope of Work ❑ E�ch�bit A-2 Task Order Agreement ❑ Exhibrt B-1 DBE Utilization Certification � Exh�b�t C Electron�c Exchange of ❑ Exh�b�t D-1 Payment - Lump Sum � E�ch�b►t D-2 Payment - Cost Plus ❑ Exhibit D-3 Payment - Hourly Rate ❑ Exhibit D-4 Payment - Provisional � Exh�bit E-1 Fee - Lump/F�xed/Umt ❑ Exh�b�t E-2 Fee - Specific Rates � E�ch►b�t F Overhead Cost ❑ E�chibrt G Subcontracted Work ❑ Exhibit G-1 Subconsultant Fee ❑ Exh►b►t G-2 Fee-Sub Spec►fic Rates ❑ Exhibrt G-3 Sub Overhead Cost � Exh�brt H Trtle VI Assurances � E�ch�brt I Payment Upon Termmation of Agreement ❑ Exhib�t J Alleged Consultant Des�gn Error Procedures � Exhibit K Consultant Cla�m Procedures ❑ Exh�brt L L�ab�l�ty Insurance � Exh�brt M-la Consultant Certification � Exh�brt M-lb Agency Offic�al � Exh�bit M-2 Certificat�on - Pnmary � Exh�brt M-3 Lobbying Cert�fication � Exhib�t M-4 Pr�cmg Data Cert�ficat►on ❑ App 31 910 Supplemental S�gnature Page THIS AGREEMENT, made and entered mto this �� between the Local Agency of City of Bremerton and the above orgamzat�on here�nafter called the "CONSLTLTANT" day of f %�idY�r , p�U�J , , Wash►ngton, hereina r called the "AGENCY" DOT Form �ao-oes EF Page 1 of 8 Revised 3/2008 WITNESSETH THAT WHEREAS, the AGENCY des�res to accompl�sh the above referenced pro�ect, and WHEREAS, the AGENCY does not have suffic�ent staffto meet the requ�red commitment and therefore deems rt adv�sable and des�rable to engage the ass�stance of a CONSULTANT to prov�de the necessary services for the PROJECT, and WHEREAS, the CONSULTANT represents that he/she �s m compl�ance w�th the Washmgton State Statutes relatmg to profess�onal reg�stration, �f applicable, and has s�gmfied a wilhngness to fumish Consulhng sernces to the AGENCY, NOW THEREFORE, m consideration of the terms, condrtions, covenants and performance contamed herem, or attached and mcorporated and made a part hereof, the part�es hereto agree as follows I General Description of Work The work under th�s AGREEMENT shall consist of the above descr�bed work and services as herem defined and necessary to accomplish the completed work for this PROJECT The CONSULTANT shall furnish all services, labor, and related equ�pment necessary to conduct and complete the work as designated elsewhere m this AGREEMENT II Scope of Work The Scope of Work and pro�ected level of effort requ�red for th�s PROJECT is detailed in Exh�brt "A" attached hereto and by this reference made a part of this AGREEMENT III General Requirements All aspects of coordmat�on of the work of th�s AGREEMENT wrth outside agencies, groups, or mdividuals shall rece�ve advance approval by the AGENCY Necessary contacts and meetmgs wrth agenc�es, groups, and/or �ndividuals shall be coordmated through the AGENCY The CONSULTANT shall attend coordmat�on, progress and presentat�on meetmgs w�th the AGENCY and/or such Federal, State, Commumty, C�ty or County offic�als, groups or mdividuals as may be requested by the AGENCY The AGENCY will prov�de the CONSULTANT sufficient not�ce pr�or to meetmgs requirmg CONSULTANT partic�pat�on The mm�mum required hours or days not�ce shall be agreed to between the AGENCY and the CONSULTANT and shown m Exhibit "A " The CONSULTANT shall prepare a monthly progress report, m a form approved by the AGENCY, which w�ll outlme m written and graph�cal form the vanous phases and the order of performance of the work m sufficient detail so that the progress of the work can easily be evaluated The CONSULTANT, and each SUBCONSULTANT, shall not d�scrimmate on the bas�s of race, color, national or�gm, or sex m the performance of th�s contract The CONSULTANT, and each SUBCONSULTANT, shall carry out applicable requirements of 49 CFR Part 26 m the award and adm�mstratton of USDOT-ass�sted contracts Failure by the CONSULTANT to carry out these requ�rements is a mater�al breach of this AGREEMENT that may result m the termmat�on of th�s AGREEMENT Partic�pat�on for Disadvantaged Busmess Enterprises (DBE), if required, per 49 CFR Part 26, or participat�on of Mmor�ty Busmess Enterpnses (MBE), and Women Business Enterpr�ses (WBE), shall be shown on the headmg of th�s AGREEMENT If D/M/WBE firms are ut�lized, the amounts author�zed to each firm and their cert�ficat�on number will be shown on E�chibit "B" attached hereto and by this reference made a part of th�s AGREEMENT If the Pr�me CONSULTANT �s a DBE firm they must comply wrth the Commerc�al Useful Funct�on (CUF) regulation outlmed m the AGENCY'S "DBE Program Part�c�pation Plan" The mandatory DBE part�c�pation goals of the AGREEMENT are those estabhshed by the WSDOT'S H�ghway and Local Programs Pro�ect Development Engmeer m consultahon w�th the AGENCY All Reports, PS&E mater�als, and other data furn�shed to the CONSULTANT by the AGENCY shall be returned All electromc files, prepared by the CONSULTANT, must meet the requirements as outlmed m Exhibrt "C " All des�gns, drawmgs, specifications, documents, and other work products, mcludmg all electromc files, prepared by the CONSULTANT pnor to complehon or termmation of this AGREEMENT are mstruments of serv�ce for th�s PROJECT, and are the property of the AGENCY Reuse by the AGENCY or by others, actmg through or on behalf of the AGENCY of any such mstruments of serv�ce, not occurrmg as a part of th�s PROJECT, shall be without liabilrty or legal exposure to the CONSULTANT Page 2 of 8 IV Time for Beginning and Completion The CONSULTANT shall not begm any work under the terms of th�s AGREEMENT unttl authonzed m wntmg by the AGENCY All work under th�s AGREEMENT shall be completed by the date shown �n the headmg of this AGREEMENT under complet�on date The established completion time shall not be extended because of any delays attr�butable to the CONSULTANT, but may be extended by the AGENCY m the event of a delay attributable to the AGENCY, or because of unavoidable delays caused by an act of GOD or governmental actions or other conditions beyond the control of the CONSULTANT A prior supplemental agreement �ssued by the AGENCY �s requ�red to extend the established completion time V Payment Provisions The CONSULTANT shall be pa�d by the AGENCY for completed work and services rendered under this AGREEMENT as provided m Exh�b�t "D" attached hereto, and by reference made part ofth�s AGREEMENT Such payment shall be full compensation for work performed or services rendered and for all labor, materials, suppl�es, equipment, and mctdentals necessary to complete the work The CONSULTANT shall conform to all applicable portions of 48 CFR Part 31 A post aud�t may be performed on th�s AGREEMENT The need for a post audrt will be determmed by the State Aud�tor, WSDOT External Audit Office and/or at the request of the AGENCY'S PROJECT Manager VI Sub-Contracting The AGENCY permrts sub-contracts for those rtems of work as shown m Exh�b�t "G" attached hereto and by this reference made part of thts AGREEMENT Compensat�on for this sub-consultant work shall be based on the cost factors shown on Exhib�t "G " The work of the sub-consultant shall not exceed rts maxtmum amount payable unless a prior written approval has been �ssued by the AGENCY All reimbursable direct labor, overhead, direct non-salary costs and fixed fee costs for the sub-consultant shall be substaritiated m the same manner as outlmed m Section V All sub-contracts shall contam all applicable prov�sions of th�s AGREEMENT W �th respect to sub-consultant payment, the CONSULTANT shall comply wrth all applicable sections of the Prompt Payment laws as set forth m RCW 39 04 250 and RCW 39 76 O11 � The CONSULTANT shall not sub-contract for the performance of any work under this AGREEMENT wrthout pr�or wr�tten perm�ssion of the AGENCY No permission for sub-contractmg shall create, between the AGENCY and sub- contractor, any contract or any other relat�onship A DBE certtfied sub-consultant �s requ�red to perform a mmimum amount of the�r sub-contracted agreement that is establtshed by the WSDOT H�ghways and Local Programs Pro�ect Development Engineer m consultation wrth the AGENCY VII Employment The CONSULTANT warrants that they have not employed or retamed any company or person, other than a bona fide employee workmg solely for the CONSULTANT, to solicit or secure this contract, and that �t has not paid or agreed to pay any company or person, other than a bona fide employee workmg solely for the CONSULTANT, any fee, commission, percentage, brokerage fee, gift, or any other considerat�on, cont�ngent upon or resultmg from the award or makmg of th�s contract For breach or vtolation of th�s warrant, the AGENCY shall have the r�ght to annul th�s AGREEMENT w�thout liab�lity or, m its discretion, to deduct from the AGREEMENT price or consideration or otherw�se recover the full amount of such fee, comm�ssion, percentage, brokerage fee, g�ft, or contmgent fee Any and all employees of the CONSULTANT or other persons while engaged m the performance of any work or services required of the CONSULTANT under th�s AGREEMENT, shall be considered employees of the CONSULTANT only and not of the AGENCY, and any and all cla�ms that may ar�se under any Workmen's Compensation Act on behalf of said employees or other persons while so engaged, and any and all claims made by a Page 3 of 8 third party as a consequence of any act or omission on the part of the CONSULTANT'S employees or other persons while so engaged on any of the work or services prov�ded to be rendered herem, shall be the sole obl�gation and respons�btlrty ofthe CONSULTANT The CONSULTANT shall not engage, on a full- or part-t�me basis, or other bas�s, durmg the period of the contract, any professional or technical personnel who are, or have been, at any time dunng the penod of the contract, m the employ of the Un�ted States Department of Transportation, or the STATE, or the AGENCY, except regularly ret�red employees, wrthout written consent of the public employer of such person VIII Nondiscrimination Durmg the performance of th�s contract, the CONSULTANT, for rtself, rts ass�gnees, and successors m mterest agrees to comply wrth the followmg laws and regulat�ons Title VI ofthe C�vil R�ghts Act of 1964 (42 USC Chapter 21 Subchapter V Sect�on 2000d through 2000d-4a) Federal-a�d H�ghway Act of 1973 (23 USC Chapter 3 Sect�on 324) Rehabilitation Act of 1973 (29 USC Chapter 16 Subchapter V Sect�on 794) Age Discnmmation Act of 1975 (42 USC Chapter 76 Sect�on 6101 et seq ) Civil R�ghts Restoration Act of 1987 (Publ�c Law 100-259) , American wrth D�sabilrties Act of 1990 (42 USC Chapter 126 Section 12101 et seq ) 49 CFR Part 21 � 23 CFR Part 200 RCW 49 60 180 In relat�on to Trtle VI of the C�vil R�ghts Act of 1964, the CONSULTANT �s bound by the provisions of Exhibrt "H" attached hereto and by this reference made part of this AGREEMENT, and shall mclude the attached Exhtb�t "H" m every sub-contract, mcludmg procurement of materials and leases of equ�pment, unless exempt by the Regulat�ons or directives �ssued pursuant thereto -� IX Termination of Agreement The r�ght �s reserved by the AGENCY to termmate this AGREEMENT at any t�me upon ten (10) days wr�tten notice to the CONSULTANT In the event this AGREEMENT �s termmated by the AGENCY other than for default on the part of the CONSULTANT, a final payment shall be made to the CONSULTANT as shown m Exhibit "I" for the type of AGREEMENT used No payment shall be made for any work completed after ten (10) days follow�ng receipt by the CONSULTANT of the Notice to Termmate If the accumulated payment made to the CONSULTANT prior to Not�ce of Termmation exceeds the total amount that would be due when computed as set forth herem above, then no final payment shall be due and the CONSULTANT shall immediately reimburse the AGENCY for any excess pa�d If the services of the CONSULTANT are termmated by the AGENCY for default on the part of the CONSULTANT, the above formula for payment shall not apply Page 4 of 8 In such an event, the amount to be pa�d shall be determmed by the AGENCY w�th considerat�on grven to the actual costs mcurred by the CONSULTANT m performmg the work to the date of termmat�on, the amount of work or�gmally required wh�ch was sat�sfactorily completed to date of term�natton, whether that work is m a form or a type wh�ch �s usable to the AGENCY at the time of termmation, the cost to the AGENCY of employmg another firm to complete the work required and the ttme wh�ch may be required to do so, and other factors which affect the value to the AGENCY of the work performed at the t�me of termmat�on Under no circumstances shall payment made under th�s subsection exceed the amount, which would have been made usmg the formula set forth above If �t �s determmed for any reason that the CONSULTANT was not m default or that the CONSULTANT'S failure to perform �s w�thout the CONSULTANT'S or rt's employee's default or negligence, the termmat�on shall be deemed to be a termmat�on for the convenience of the AGENCY In such an event, the CONSULTANT would be reimbursed for actual costs m accordance w�th the term�nation for other than default clauses listed previously In the event of the death of any member, partner or officer of the CONSULTANT or any of rts superv�sory personnel ass�gned to the PROJECT, or d�ssolution of the partnershtp, termmation of the corporation, or d�saffil�ation of the prmcipally mvolved employee, the surv�vmg members of the CONSULTANT hereby agree to complete the work under the terms of this AGREEMENT, �f requested to do so by the AGENCY Th�s subsection shall not be a bar to renegotiation of the AGREEMENT between the survivmg members of the CONSULTANT and the AGENCY, if the AGENCY so chooses In the event of the death of any of the parttes listed m the prev�ous paragraph, should the survivmg members of the CONSULTANT, with the AGENCY'S concunence, desire to termmate th�s AGREEMENT, payment shall be made as set forth m the second paragraph of th�s section Payment for any part of the work by the AGENCY shall not constrtute a warver by the AGENCY of any remed�es of any type �t may have agamst the CONSULTANT for any breach of this AGREEMENT by the CONSULTANT, or for failure of the CONSULTANT to perform work requ�red of it by the AGENCY Forbearance of any rights under the AGREEMENT will not constrtute warver of entrtlement to exerc�se those nghts wrth respect to any future act or om�ssion by the CONSULTANT X Changes of Work The CONSULTANT shall make such changes and rev�sions m the complete work of this AGREEMENT as necessary to correct errors appeanng therem, when required to do so by the AGENCY, w�thout addrtional compensation thereof Should the AGENCY find it destrable for its own purposes to have previously sattsfactor�ly completed work or parts thereof changed or rev�sed, the CONSULTANT shall make such rev�sions as directed by the AGENCY Th�s work shall be considered as Extra Work and will be paid for as herein provided under Section XIV XI Disputes Any d�spute concernmg questions of fact m connect�on w�th the work not dtsposed of by AGREEMENT between the CONSULTANT and the AGENCY shall be refened for determmatton to the D�rector of Publtc Works or AGENCY Eng�neer, whose dec�sion m the matter shall be final and bmdmg on the part�es of th�s AGREEMENT, provided, however, that if an act�on �s brought challengmg the D�rector of Publ�c Works or AGENCY Engmeer's dec�s�on, that dec�s�on shall be sub�ect to de novo �udicial review If the part�es to this AGREEMENT mutually agree, disputes concernmg alleged design errors w�ll be conducted under the procedures found m Exh�brt "J", and disputes concernmg cla�ms will be conducted under the procedures found m Exh�bit "K" Xil Venue, Applicable Law, and Personal Jurisdiction In the event that either party deems it necessary to mstitute legal act�on or proceedmgs to enforce any r�ght or obl�gation under this AGREEMENT, the parties hereto agree that any such action shall be m�t�ated m the Superior court of the State of Washmgton, s�tuated m the county m whtch the AGENCY is located The parties hereto agree that all questions shall be resolved by appl�cation of Washmgton law and that the part�es to such action shall have the right of appeal from such decis�ons of the Superior court m accordance with the laws of the State of Washmgton The CONSLILTANT hereby consents to the personal �unsdiction of the Supertor court of the State of Washmgton, s�tuated in the county m wh�ch the AGENCY is located Page 5 of 8 XIII Legal Relations The CONSULTANT shall comply wrth all Federal, State, and local laws and ordmances appl�cable to the work to be done under th�s AGREEMENT This contract shall be mterpreted and construed m accordance wrth the laws of the State of Washmgton The CONSULTANT shall mdemmfy and hold the AGENCY and the STATE and its officers and employees harmless from and shall process and defend at �ts own expense all clatms, demands, or suits at law or equrty ar�smg m whole or m part from the CONSULTANT'S negligence or breach of any of rts obligations under th�s AGREEMENT, provided , that nothmg herem shall requ�re a CONSULTANT to mdemmfy the AGENCY or the STATE agamst and hold harmless the AGENCY or the STATE from claims, demands or su�ts based solely upon the conduct of the AGENCY or the STATE, the�r agents, officers and employees, and provided further that if the cla�ms or surts are caused by or result from the concurrent negltgence of (a) the CONSULTANT'S agents or employees, and (b) the AGENCY or the STATE, the�r agents, officers and employees, th�s mdemmty prov�s�on w�th respect to (1) claims or surts based upon such negl�gence (2) the costs to the AGENCY or the STATE of defendmg such claims and su�ts shall be val�d and enforceable only to the extent of the CONSULTANT'S negl�gence or the negligence of the CONSULTANT'S agents or employees The CONSULTANT'S relat�on to the AGENCY shall be at all times as an mdependent contractor The CONSULTANT shall comply wtth all appl�cable sect�ons of the appl�cable Eth�cs laws, mcludmg RCW 42 23, which is the Code of Ethtcs for regulatmg contract mterest by mumc�pal officers The CONSULTANT specifically assumes potent�al Itab�lrty for act�ons brought by the CONSULTANT'S own employees agamst the AGENCY and, solely for the purpose of this mdemn�fication and defense, the CONSULTANT specifically waives any immumty under the state mdustrial msurance law, T�tle 51 RCW Unless otherwise spec�fied m the AGREEMENT, the AGENCY shall be respons�ble for admmistration of construction contracts, if any, on the PROJECT Sub�ect to the processmg of a new sole source, or an acceptable supplemental agreement, the CONSULTANT shall provide On-Call ass�stance to the AGENCY dunng contract admmistration By providmg such assistance, the CONSULTANT shall assume no respons�bil�ty for proper construction techniques, �ob site safety, or any construchon contractor's fa�lure to perform rts work m accordance wrth the contract documents � The CONSULTANT shall obtam and keep m force dunng the terms of the AGREEMENT, or as otherwise required, the followmg msurance wrth compames or through sources approved by the State Insurance Comm�ssioner pursuant to Trtle 48 RCW Insurance Coverage A Worker's compensation and employer's l�abil�ty msurance as required by the STATE B Commerc�al general l�ability and property damage msurance m an aggregate amount not less than two mill�on dollars ($2,000,000) for bod�ly m�ury, mcludmg death and property damage The per occurrence amount shall not exceed one mill�on dollars ($1,000,000) C Veh�cle hability msurance for any automob�le used �n an amount not less than a one mill�on dollar ($1,000,000) comb�ned smgle hmrt Exceptmg the Worker's Compensat�on Insurance and any Professional Liabil�ty Insurance secured by the CONSULTANT, the AGENCY w►11 be named on all policies as an additional msured The CONSULTANT shall furn�sh the AGENCY wrth verificat�on of msurance and endorsements requ�red by the AGREEMENT The AGENCY reserves the r�ght to requ�re complete, cert�fied copies of all requ�red msurance pol�cies at any time All msurance shall be obtamed from an msurance company author�zed to do busmess m the State of Washmgton The CONSULTANT shall subm�t a verificat�on of msurance as outlmed above withm fourteen (14) days of the execution of th�s AGREEMENT to the AGENCY No cancellahon of the foregoing poLcies shall be effect�ve wrthout th�rty (30) days prior not�ce to the AGENCY The CONSULTANT'S professional habihty to the AGENCY shall be l�mrted to the amount payable under th�s AGREEMENT or one milhon ($1,000,000) dollars, whichever is the greater, unless mod�fied by Exh�brt "L" In no case shall the CONSULTANT'S profess�onal l�abihty to third part�es be I�mrted m any way Page 6 of 8 The AGENCY will pay no progress payments under Sect�on V until the CONSULTANT has fully complied wrth th�s section This remedy �s not exclusive, and the AGENCY and the STATE may take such other achon as �s available to rt under other provis�ons of this AGREEMENT, or otherwise m law XIV Extra Work A The AGENCY may at any time, by wr�tten order, make changes withm the general scope of the AGREEMENT m the services to be performed B If any such change causes an �ncrease or decrease m the est�mated cost of, or the t�me required for, performance of any part of the work under this AGREEMENT, whether or not changed by the order, or otherw�se affects any other terms and condrt�ons ofthe AGREEMENT, the AGENCY shall make an equitable adJustment m the (1) max�mum amount payable, (2) delivery or completion schedule, or both, and (3) other affected terms and shall mod�fy the AGREEMENT accordmgly C The CONSULTANT must subm�t any "request for equ�table ad�ustmenY', hereafter referred to as "CLAIM", under th�s clause withm th�rly (30) days from the date of recetpt of the written order However, if the AGENCY dectdes that the facts �ustify it, the AGENCY may recetve and act upon a CLAIM subm�tted before final payment of the AGREEMENT D Failure to agree to any adJustment shall be a d�spute under the D�sputes clause However, nothmg m th�s clause shall excuse the CONSULTANT from proceedmg with the AGREEMENT as changed E Notw�thstandmg the terms and cond�tions of paragraphs (A) and (B) above, the max�mum amount payable for this AGREEMENT, shall not be �ncreased or considered to be mcreased except by specific wntten supplement to this AGREEMENT XV Endorsement of Plans If applicable, the CONSULTANT shall place the�r endorsement on all plans, est�mates, or any other engmeermg data furnished by them XVI Federal and State Review The Federal Highway Admm�stration and the Washmgton State Department of Transportahon shall have the nght to participate m the review or exammat�on of the work m progress XVII Certification of the Consultant and the Agency Attached hereto as Exhtbrt "M-1(a and b)" are the Certifications ofthe CONSULTANT and the AGENCY, Exh�brt "M -2" Certification Regardmg Debarment, Suspens�on and Other Respons�bil�ty Matters - Pr�mary Covered Transactions, Exhib�t "M-3" Cert�ficat�on Regardmg the Restr�cttons of the Use of Federal Funds for Lobbymg and Exhibrt "M-4" Cert�ficate of Current Cost or Pncmg Data Exhib�t "M-3" is required only m AGREEMENTS over $100,000 and Exh�bit "M-4" �s required only m AGREEMENTS over $500,000 XVIII Complete Agreement This document and referenced attachments contam all covenants, stipulations, and provisions agreed upon by the parties No agent, or representative of e�ther party has author�ty to make, and the part�es shall not be bound by or be l�able for, any statement, representation, promise or agreement not set forth herem No changes, amendments, or modifications of the terms hereof shall be valid unless reduced to writing and signed by the parties as an amendment to this AGREEMENT XIX Execution and Acceptance This AGREEMENT may be simultaneously executed m several counterparts, each of wh�ch shall be deemed to be an arigmal havmg �dentical legal effect The CONSULTANT does hereby ratify and adopt all statements, representat�ons, warranties, covenants, and agreements contamed m the proposal, and the supportmg mater�al submitted by the CONSULTANT, and does hereby accept the AGREEMENT and agrees to all ofthe terms and condrtions thereof Page 7 of 8 in witness whereof, the parties hereto have executed this AGREEMENT as of the day and year shown in the "Execution Date" box on page one (1) of this AGREEMENT By • �� Consultant Parametrix, Inc By Age � ncy Crty o remerton DOT Fortn 140-089 EF Revised 3/2008 Page 8 of 8 EXHIBIT A-1 Scope of Work City of Bremerton Pacific Avenue Improvements Enqineerinq Services INTRODUCTION The Pacific Avenue Improvements pro�ect consists of roadway, non-motor�zed transportation and stormwater improvements on Pacific Avenue between 6�' and 11�',Streets Th�s Scope of Work (SOW) describes our proposed work activities associated with engmeermg des�gn and completion of plans and special provisions necessary to bid and construct the improvements durmg summer 2013 Work will be based on the origmal 100% plan set delivered by Parametrix m July 2011 Revisions to this design will be mcorporated and final Bid Set plans and Spec�al Provisions will be delivered The followmg tasks are associated with this SOW Task 01 — Project Management Objective: Obtam proJect data, develop pro�ect work plan, momtor and manage scope, schedule and budget, and periodically meet with City staff and other members of the design team to review pro�ect status Activities: The followmg achvrties are associated wrth this task • Schedule, prepare for, attend, and document up to three proJect meetmgs that will mclude the Consultant and Crty staff, either m person or by conference call � Pro�ect kickoff y Revised 100% design review meetmg y Final design review meetmg • Manage and direct the pro�ect techmcal team Provide routme pro�ect management and commumcations (scope, schedule, budget, mvoicmg, etc ) • Prepare detailed monthly progress reports and progress billmgs and submit to the City for approval and payment The monthly report will mclude y A narrative of the work performed and the tasks to be performed m the next reportmg period, and, if necessary, explanation of delays, problems, responsive action requirements by the Consultant and the City, and other pro�ect needs z An update on schedule progress Crty of Bremerton 237-1896-854 Pacific Avenue Engineenng Services 1 , January 3l 2013 y A summary of actual versus scheduled costs Debverables: The followmg deliverables will be prepared • Routme correspondence mcluding monthly progress reports • Meetmg agendas and notes Assumptions: The followmg assumptions apply to this task • The duration of the pro�ect �s estimated to be eleven months (February through December 2013) Task 02 — Traffic Study Ob�ective: Conduct traffic studies for evaluation of the 6�' and Pacific mtersection The purpose of the work is to determme if the proposed mtersection s�gnals are required or if they can be replaced wrth a 4-way stop If the signals are not required, the proposed ra�sed mtersection will be retamed if the signals are required, the ra�sed mtersection will be removed Assoctated design achvit�es for removal of the ra�sed mtersection work will be completed under Task 5 Approacb The followmg activities will be performed • A subconsultant (All Traffic Data) will be retamed to perform traffic counts • Perform a signal warrant analysis m accordance with the latest MUTCD manual Dellverables: The followmg deliverables are associated with th�s task Brief techmcal memoranda presentmg the traffic counts, warrant analysis results, and recommendations Assumptions: The followmg assumptions are associated with this task � Traffic counts will be performed on the approach legs m all four directions for a total of four consecutive calendar days dur�ng the mid-week • Manual pedestnan/bicycle counts w�ll not be requ�red Task 03 — Electrical Design Objective: Replace the origmally-designed double-mast lummaires wrth Crty proposed double-mast Lumec lummaires Dependmg on the results of the traffic study, remove the new signal system(s) from the plans Approach The followmg activrties will be performed • Review existmg illummahon design by SVR/TresWest revise as needed and mcorporate design �nto "Other Electrical Systems" Plans prepared by Parametrix. Plans will be re- trtled "Illumination and Electrical Systems" Gty of Bremerton 237-1896-854 Pacrfrc Avenue Engrneenng Servrces 2 January 31, 2013 • Revise plans as necessary to delete the s�gnal system(s) DeLverables: The followmg del�verables are associated wrth this task • Deliverables w�ll consist of revised design sheets provided under Task 5 Assumptions: The followmg assumptions are associated wrth this task o A lumen study usmg the proposed Lumec lummaires will be performed by the Crty • The existmg lummatre locations will not change sigmficantly such that revisions to roadway, sidewalk, or driveway geometncs are requ�red • The Lumec lummare and associated details will not be drafted m CAD, mstead, vendor cut sheets will be mcluded m an appendix to the specifications • No revisions will be necessary to the existmg electrical plans for the "Other Electrical" design other than to accommodate addrtion of rev�sed lummaire des�gn • No revisions will be necessary to the ex�shng electrical or illummation plans between 9�' and 11`" to accommodate the overhead power lmes to remam Task 04 — Drainage and Paving Design Objective: Revise pavmg and dramage des�gn that proposed full width pervious concrete to accommodate standard HMA driving lanes and pervious concrete parlcmg lanes Approach The followmg achvrties w�ll be performed • Review dramage report and design prepared by SVR • Redesign and revise pavmg and dramage sheets Deliverables: The followmg deliverables are associated with this task • Deltverables w�ll cons�st of rev�sed design sheets provided under Task 5 Assumptions: The followmg assumptions are associated wrth this task • Standard asphalt section shall consist of 6 mches of HMA underlam by 6 mches of crushed surfacmg top course • Dramage design work will cons�st of ver�ficat�on of previous work by SVR and ad�ustment of dramage per revised des�gn • Infiltration beds will be sized with a width to match the parlang lanes and a thickness of aggregate discharge subbase of 12 mches to match the origmal design The predicted mfiltration volume usmg th�s design will be calculated and provided to the City • City will provide water and samtary design for evaluation of pipe conflicts by Parametrix Crry of Bremerton 237-1896-854 Pacrfic Avenue Engmeenng ServJCes 3 January 31 20/3 Task 05 — Revised 100%, Final, and Bid Set Plans, and Specifications and Estimate Objective: Based on prev�ous design data and files, prepare Revised 100%, Final, and Bid Set plans, and specifications It is antic�pated that the work will not require sigmficant changes to road geometrics An exception is parkmg m front of the post office, which will be revised to back- m angled parkmg Achvities: The followmg activities would be performed as part of this task • The Rev�sed 100%, Final, and Bid Set plans completed and sealed by Parametrix will consist of the followmg sheets ➢ Cover Sheet wrth Vicm�ty and Location Map ➢ Key Map and Index Sheet ➢ Legend Sheet ➢ Survey Control Sheet ➢ Existmg Condrtion Plans (2 Sheets) ➢ Site Preparation and Demol�tion Plans (2 Sheets) ➢ Typical Roadway Sections (2 Sheets) ➢ Detailed Pavmg Plans (6 Sheets) ➢ Pavmg Profiles (4 Sheets) ➢ Hardscape and Streetscape Details (5 Sheets) ➢ Dramage Plan and Profiles (4 Sheets) ➢ Dramage Details (4 Sheets) ➢ Illummation Plans and Details (3 Sheets) ➢ Other Electrical Systems Plans and Details (3 Sheets) ➢ Channelization and Sigmng Plans (4 Sheets) ➢ Jomt Utilrty Trench Plans (2 Sheets) • Prepare Revised 100%, Final, and Bid Set Special Provisions • Provide support for City developed cost estimate mcludmg quantrties and cost mformation Del�verables: The followmg deliverables are associated with this task: Crty of Bremerton 237-/896-854 Pac�frc Avenue Engmeenng Services 4 January 31, 2013 • Three hard copy sets of Revised 100%, Final, and Bid Set Plans on 11x17, Contract Documents and Special Prov�sions • Three hard copies and one pdf set of sealed Bid Set Plans on full s�zed sheets • AutoCAD and pdf files of all drawmgs and documents — provtded on CD Assumptions: The followmg assumpttons are associated with this task • Two schematics showmg back m angle parkmg options wrth vehicle movements will be submitted • Existmg design drawmgs by others will be provided by the City m CAD format • One set of consol�dated review comments each will be received for the Revised 100% and Final Plans and Spec�al Provisions • Review comments to Final Plans and Special Provisions will be mimmal • The City will provide the final legal documents and compile the Contract Documents Task 06 — DIRECTED SERVICES Objective: Provide addihonal techmcal services as requested and authorized m writmg by the City Activities: The followmg activ�ties may be associated wrth th�s task • Addrtional design tasks • Engmeering support durmg biddmg • Production of conformance documents • Engmeermg support during construction De6verables: The followmg deliverables will be prepared • Informahon associated wrth directed services Assumptions: The followmg assumptions apply to this task • Work under this task will require prior wntten authorization from the Crty Gry of Bremerton 237-/896-854 Pacrfic Avenue Engrneenng Servrces 5 January 31. 2013 Schedule Work Element Completed By Notice to Proceed February 6, 2013 Traffic Counts February 15, 2013 Signal Warrant Analysis Rewsed 100% Plans and Special Provisions Final Plans and Special Provisions Bid Set Plans and Special Provisions Advertise for Bid February 22, 2013 February 28, 2013 March 15, 2013 Apnl 1, 2013 April 15, 2013 � Pro�ect Close Out December, 31 2013 NOTES • The assumed turn-around time for Crty review is 1 week � Crry of Bremerton 237-1896-854 Pacefrc Avenue Engrneenng Servtces 6 January 31, 2013 Budget Summary TASKS 1-5 LABOR, OVERHEAD, PLUS FIXED FEE EXPENSES SUBCONSULTANT (ALL TRAFFIC DATA) $66,618 $519 $1,500 TOTAL AMOUNT AUTHORIZED $68,637 TASK 6 DIItECTED SERVICES (MANAGEMENT RESERVE) $6,863 GRANDTOTAL ......................................................................................................... $75,500 See Exhibrt E-1 for a detailed breakdown of costs City of Bremerton 237-1896-854 Pacrfic Avenue Engmeerrng Servrces 7 January 31, 2013 Exhibit C Electronic Exchange of Engineering and Other Data In this E�ibrt the agency, as applicable, is to provide a description of the format and standards the consultant is to use m preparmg electromc files for transmission to the agency The format and standards to be provided may mclude, but are not limrted to, the followmg I Surveymg, Roadway Design & Plans Preparation Section A Survey Data B Roadway Des�gn Files C Computer Aided Draftmg Files D Spectfy the Agency's Right to Review Product w�th the Consultant E Specify the Electromc Deliverables to Be Provided to the Agency F Specify What Agency Furnished Services and Information Is to Be Provided II Any Other Electronic Files to Be Provided III Methods to Electromcally Exchange Data A Agency Software Su�te B Electromc Messagmg System C F�le Transfers Format DOT Form 140-089 EF Exhibit C Revised 6/05 Exhibit D-2 Payment (Cost Plus a Fixed Fee) The CONSLILTANT shall be paid by the AGENCY for completed work and serv�ces rendered under th�s AGREEMENT as provided heremafter Such payment shall be full compensation for work performed or services rendered and for all labor, materials, supplies, equipment, and mcidentals necessary to complete the work spec�fied m Section II, "Scope of Work " The CONSi1LTANT shall conform to all applicable portions of 48 CFR Part 31 A Actual Costs Payment for all consultmg serv�ces for th�s PROJECT shall be on the basis of the CONSULTANT'S actual cost plus a fixed fee The actual cost shall mclude direct salary cost, overhead, dtrect non-salary costs, and fixed fee � D�rect Salary Costs The Direct Salary Cost is the direct salary paid to prmcipals, professtonal, techmcal, and cler�cal personnel for the time they are product�vely engaged m work necessary to fulfill the terms of this AGREEMENT The CONSULTANT shall mamtam support data to verify the direct salary costs billed to the AGENCY Overhead Costs Overhead Costs are those costs other than direct costs, which are mcluded as such on the books of the CONSLJLTANT m the normal everyday keepmg of its books Progress payments shall be made at the rate shown m the headmg of this AGREEMENT under "Overhead Progress Payment Rate " Total overhead payment shall be based on the method shown m the headmg of the AGREEMENT The two opt�ons are explamed as follows a Fixed Rate If this method is mdicated m the headmg of the AGREEMENT the AGENCY agrees to reimburse the CONSULTANT far overhead at the percentage rate shown This rate shall not change durmg the life of the AGREEMENT b Actual Cost If this method is indicated m the headmg of the AGREEMENT the AGENCY agrees to re�mburse the CONSt1LTANT the actual overhead costs verified by audrt, up to the Maximum Total Amount Payable, authorized under this AGREEMENT, when accumulated with all other Actual Costs A summary of the CONSiJLTANTS cost est�mate and the overhead computatton is shown m E�ibrt "E" attached hereto and by this reference made part of this AGREEMENT When an Actual Cost method is used, the CONSLJI,TANT (pr�me and all sub-consultants) will submit to the AGENCY withm s�x (6) months after the end of each firm's fiscal year, an overhead schedule m the format required by the AGENCY (cost category, dollar expenditures, etc ) for the purpose of ad�ustmg the overhead rate for billmg purposes It shall be used for the computation of progress payments durmg the followmg year and for retroact�vely ad�ustmg the prev�ous year's overhead cost to reflect the actual rate DOT Form 140-089 EF Exhibit D-2 Revised 6/08 Fatlure to supply this mformatton by erther the prime CONSULTANT or any of their sub- consultants shall cause the AGENCY to wrthhold payment of the billed overhead costs until such hme as the required mformatton is received and an overhead rate for billmg purposes is approved' The AGENCY, STATE and/or the Federal Government may perform an audit of the CONSULTANT'S books and records at any time during regular busmess hours to determme the actual overhead rate, if they so desire Direct Non-Salary Costs D�rect Non-Salary Costs will be reimbursed at the Actual Cost to the CONSIILTANT These charges may mclude, but are not limited to, the followmg rtems travel, prmtmg, long distance telephone, supplies, computer charges and sub- consultant costs a Air or tram travel will be re�mbursed only to economy class levels unless otherwise approved by the AGENCY The CONSULTANT shall comply with the rules and regulattons regardmg travel costs (excludmg air, tram, and rental car costs) m accordance with the AGENCY'S Travel Rules and Procedures However, air, tram, and rental car costs shall be re�mbursed m accordance wrth 48 CFR Part 31 205-46 "Travel Cost b The billmg for Direct Non-Salary Costs shall mclude an rtemized listmg of the charges directly identifiable wh the PROJECT c The CONSLJLTANT shall mamtam the origmal supportmg documents m the�r office Copies of the or�gmal supportmg documents shall be supplied to the AGENCY upon request d All above charges must be necessary for the services provided under this AGREEMENT Fixed Fee The Fixed Fee, wh�ch represents the CONSiJLTANT'S profit, is shown m the headmg of this AGREEMENT under Fixed Fee This amount does not mclude any addrtional Fixed Fee, wh�ch could be authorized from the Management Reserve Fund This fee is based on the Scope of Work defined m th�s AGREEMENT and the estimated person- hours required to perform the stated Scope of Work In the event the CONStJLTANT enters mto a supplemental AGREEMENT for additional work, the supplemental AGREEMENT may mclude provisions for the added costs and an appropnate addrtional fee The Fixed Fee will be prorated and pa�d monthly m proportion to the percentage of work completed by the CONSiJLTANT and reported in the Monthly Progess Reports accompanymg the billmgs Any portion of the Fixed Fee earned but not prevtously paid m the progress payments will be covered m the final payment, sub�ect to the provisions of Sectton IX entrtled "Termmatton of Agreement " Management Reserve Fund The AGENCY may des�re to establ�sh a Management Reserve Fund to provide the Agreement Admimstrator wrth the flexibility to authorize addrtional funds to the AGREEMENT for allowable unforeseen costs, or reimbursmg the CONSULTANT for addrtional work beyond that already defined m this AGREEMENT Such authorization(s) shall be m wrtting and shall not exceed the lesser of $100,000 or 10% of the Total Amount Authorized as shown m the headmg of this AGREEMENT The amount mcluded for the Management Reserve Fund is shown m the headmg of th�s AGREEMENT This fund may not be replemshed Any changes requirmg addrtional costs m excess of the Management Reserve Fund shall be made m accordance with Section XIV, "Extra Work "6 Max�mum Total Amount Payable The Maxtmum Total Amount Payable by the AGENCY to the CONSULTANT under this AGREEMENT shall not exceed the amount shown m the headmg of this AGREEMENT The Maacimum Total Amount Payable is comprised of the Total Amount Authorized, and the Management Reserve Fund The Max�mum Total Amount Payable does not mclude payment for Extra Work as stipulated m Sect�on XIV, "Extra Work " No minimum amount payable �s guaranteed under this AGREEMENT B Monthly Progess Payments The CONSULTANT may submit billmgs to the AGENCY for re�mbursement of Actual Costs plus the calculated overhead and fee on a monthly basis durmg the progress of the work Such billings shall be m a format approved by the AGENCY and accompanied by the monthly progress reports required under Section III, "General Requirements" of this AGREEMENT The billmgs will be supported by an rtemized listmg for each rtem mcludmg Direct Salary, Direct Non-Salary, and allowable Overhead Costs to which will be added the prorated Fixed Fee To provide a means of verifymg the billed salary costs for CONSULTANT employees, the AGENCY may conduct employee mterviews These mtervtews may consist of recordmg the names, t�tles, salary rates, and present duties of those employees performmg work on the PROJECT at the time of the mterview C Final Payment Final Payment of any balance due the CONSLTLTANT of the gross amount earned will be made promptly upon �ts verification by the AGENCY after the completion of the work under thts AGREEMENT, conttngent upon receipt of all PS&E, plans, maps, notes, reports, electromc data and other related documents which are requ�red to be furnished under this AGREEMENT Acceptance of such Final Payment by the CONSiJLTANT shall constitute a release of all claims for payment, which the CONSiJLTANT may have agamst the AGENCY unless such claims are specifically reserved m wrrtmg and transmitted to the AGENCY by the CONSiJLTANT prior to its acceptance Satd Final Paymeht shall not, however, be a bar to any clatms that the AGENCY may have agamst the CONSi1LTANT or to any remedies the AGENCY may pursue with respect to such claims The payment of any billmg will not constitute agreement as to the appropriateness of any item and at the time of final aud�t, all requ�red ad�ustments will be made and reflected m a final payment In the event that such final audit reveals an overpayment to the CONSLJLTANT, the CONSULTANT will refund such overpayment to the AGENCY wrthm thtrty (30) days of notice of the overpayment Such refund shall not constttute a waiver by the CONSULTANT for any claims relatmg to the validity of a findtng by the AGENCY of overpayment The CONSLILTANT has twenty (20) days after receipt of the final POST AUDIT to begm the appeal process to the AGENCY for audrt findmgs D Inspectton of Cost Records The CONSiJLTANT and their sub-consultants shall keep available for mspection by representatives of the AGENCY, STATE and the United States, for a period of three (3) years after receipt of final payment, the cost records and accounts perta�mng to this AGREEMENT and all �tems related to or beanng upon these records with the followmg exceptton if any lrttgahon, claim or audrt arismg out of, m connection wrth, or related to this contract is mitiated before the expiration of the three (3) year period, the cost records and accounts shall be retamed until such lrt�gation, clatm, or audrt mvolvmg the recards is completed Exhibit E-1 Consultant Fee Determmation - Summary Sheet (Cost Plus Fixex Fee ) Pro�ect Pacific Avenue Improvements Engineer�ng Services Direct Salary Cost (DSC) Classification Pro�ect Manager (David Dinkuhn) Engineerlll(Dean Zavack) Engineer III (Brian Woodburn) Senior Engmeer (Ryan Abbotts) Engineer IV (Jack Wright) Senior Engineer (Kewn House) Semor Engineer (Bob Franklin) CADD Word Processmg Accounting Pro�ect Support Man Hours = 105 X 100 X 14 X 4 X 88 X 6 X 50 X 150 X 15 X 6 X 12 X X X X X X Rate $48 17 $33 00 $36 67 $49 69 $42 02 $60 55 $70 00 $25 00 $25 00 $26 95 $2135 Total DSC = Cost $5,057 85 $3,300 00 $513 38 $198 76 $3,697 76 $363 30 $3,500 00 $3,750 00 $375 00 $161 70 $256 20 $0 00 $0 00 $0 00 $0 00 $0 00 _ $21,173 95 Overhead (OH Cost -- including Salary Additives) OH Rate x DSC of 199 83 % x$ $21,173 95 $42,31190 Fixed Fee (FF) FF Rate x DSC of Reimbursables Expenses Grand Total $2,018 88 $2,018 88 $68,636 36 Prepared By David Dinkuhn Date 1/30/2013 14 79 % x $ $21,173 95 $3,13163 DOT Form 140-089 EF Exhibit E-1 Revised 6/OS Exhibit F � � Washongton State Departunent o� '6'r�u�sporY�Bioaa Paula J. Oiammond, 6�.�. Serxetary of Transportalion May 30, 2012 Janice Walden, Sen�or Financial Analyst Pa�aniehix, Inc 1002 15`�' Street, Suite 220 Aubun�, WA 98001-G502 RE. Parametrix Overhead Schedule Fiscal Year �nd December 30, 2011 Dear Ms. Walden: Transportation Buddtng 310 Maple Park Avenue S E P O Box 47300 Oiympia, WA 985D47300 360-705-7000 1'TY 1-800-833-6388 www wsdot wa gov We have completed a desk review of your overhead scl�edule foi the above referenced fiscal year. Our review ii�cluded the docwnentation piovided by Parametiix. The sclledule w�s audited Uy the Clatk NuUei, CPAs, for compliance with Part 31 of the Federal Acquisition Regulations Clark Nuber accepted an overhead rate for the yefu ended December 30, ZO11, at 199 83% of direct laUor. Based on our ieview of the Clarlc Nuber Audit Report, we are issuutg this letter of review establislung Paramehix overhead iate for the fiscai year ending December 30, 2011, at 199.83°/a of diiect labor. This rate does include Facilities Cost of Capital of 0 76% Costs billed to actual agreements w�ll sttll Ue subject to audit of actual costs. Please check with� the WSDOT Consultant Services O�ce (�IQ) and/or the WSDOT Area Consultant Liaison to detei7nine when tliis reviewed rate will be applicable to your WSDOT agreement(s). Also, remember tl�at when you piovide next year's oveihead schedule to our office, you wilI also need to submit eitlier your internally prepared Conrpe�rsahon Analysra foi oui ieview, or use the National Compe�isalion �Ylnh �s (NCM) foi�niat to pteplie yo�u alternate a�ialysis az�d we will ieview that. Tlie NCM is a tool that estabhshes compensation amounts presumed reasonable foi certain executive positions. The Conrpensnttot� Analysis a�id NCM are described further in the AASHTO Audit Guide, Chapter 7 We will need youi Conrpeltsalio�r �l�rn/ysls, or alternative a�ialysis based on use of the NCM, in order to complete our review of youi oveiliead schedttle. Para�netrix, Inc May 30, 2012 Page 2 If you, or any repiesentatives of Parametrix, l�ave any questions, please contact Martha Roacli, Jeii Sivettson, or Steve McICeiney at (360) 705-7003 Sincerely, � � �� I � Martlia S. Roach Agieement Complia�ice Audit Manager MR:ds Enclosure cc• Steve McKeniey, Director of Ii�ternal Attdit Jeri Sivertson, Assistant Directoi of Internal Audit Larry Scliofield, MS 47323 Karen Ledbetter, CPA, Senioi Ma�iagec of Clark NuUer, rile � 1 i � � � � � i : � � PARAMETRIX, INC. AND SUBSIDIARY Co�rsolidated Statel�rent of D�rect Labo�, Fi�iiige Benefrts rrud General Ovei•/read For tlre Ffscal Year Eirde�l Dece��ibe�• 30, 201Y Ge�iem! Lcdger Dnlm¢c jordiaRscal)enrBrrAed Una!louab/e ProposeA Dearipdmi DearnGer30, 20i1 E.cpentes Re An�wuu Pacenf DlroelLebo� S 17,340,&18 S - S 17,348.838 100 ODY. Fringo BeneSta VaC81bn, Siok LeevB� HOlidey3 3,787�880 3.787,880 21724e PaymU Taxas 2,875,182 (75,285) F 2,859,897 18.48Ye Medleal Insurdnce 3,316,574 9,915,874 1911% ESOP Raliremeni Plan BOD 000 600,U00 3 48°.b Total Fdngu BenaOls r 10,558,818 (18,285) 10,643,351 80 77Y. (ianeral Overheed AdmlNshaUve Salartes 8,810,b10 (&R,788) p 9,624,724 4814% TraiNng Selariee 280,128 T80,129 15D;5 BonuseslMtacSatedes 7SB,223 (95,873) B 682,350 38296 Markeling Salarles 1,024,149 (1,332) C 1.02Z.817 5.9DYo Bid and Proposal Selarise 2,Bg8,822 2,698,922 1S.54Yo AdveiUsl� Expense 130,777 (78,187) D 51,810 0.30% MarkelingExpenses 218,811 (40,868) E 178,045 103�5 Excise Taxes 670,838 8T0,838 3 6755 Insuranae ` 7B1,923 787,923 A 5196 Oflica Ren! 3,728,359 3,728,359 21 4855 Omce Expenses & Suppltes 178,88! (28,259) O 149,605 o B6°5 Sleff AppreciaUon, Awards 74,985 (38,752y H 38,233 0 2196 PdnUnp, CoplerlPdnter Supplles 317.604 (988) I 316,518 18295 Billwl In-house Prinling (483,585) (493,585) •2 85% Telephone 332,941 332,841 192,5 Oepteclallon (Indudinp gffinlloss on dlsposal) 1,838,823 1,B3B,B23 10.8055 BusNess Meals 58,713 (68,713) J 0 OOYe Aulo Expense 248,443 (28) K 248,417 1 43°,6 Blped In-house M9eaga (385.453) (388,483) -2 719'. OflkeTravel 385,9A1 (9,818) L 378,122 21795 SLbscripliorre, Llbrary Material 44,80T 44,907 0 269L � 90,229 (9,821) M 80,408 046;5 DonaUons 28,089 (28,088) N 00046 ProfeSSionelUcenses 13,847 13,647 D OB45 Poslage, Couriers, Frelght 37,180 37,180 0 2196 TraNInglEduealbn 948,814 (15,058) p 330,55g � g�g; Field EqutpmentlSupplies 24,142 24,142 0.14% SurveyEqulpmenUSup�lea 28.875 28,875 078°,: Heailit & Setely EqulpmeoUSuppUes 3,113 3,113 0 01°.6 EleeMwlEqulpmenUSuppllea 1,250 1,250 00146 BWed In-house Equlpment (122,180� (89,713) p (211,893) -7 22% Ofifee Fumllure 8,SS4 8,654 0 OS% Omce Equtpmenl 476,870 418,870 2 407G Compuler Supptles/Sofiwaru 1,242,�88 (8,28D) p 1,238,788 71254 Biqed In house Computer Charpes (38,048) (35,048) -0 20Ye Rerruilin9 �91s 28,072 (10) R 28.062 018'h Payfotl. Leg� 8 Audit 207,828 (17,2D3) S 19D,823 1 109e Tamporary Le6or b8,03B 59,038 0 34%, ConsulUngSeMces 431,407 (S,A98) T 425,909 2q5°,5 Emptoyee RelxaUnn Cosla 10,855 10,655 0 OB% BedDebt9 80,760 (80,780) U OOOYe Of1lceMovtnplRemodeling 18,044 18,044 01095 PersOnal PmpeAyTexea 78,652 78,882 0 454'e UlllWeslBUlidinp Melnlanence 182,639 182,539 1 OS°6 (Nereal, Bank Charges 9,380 (969) V 8,411 0 OS'K Tolal Qeneral Overhead 24.693,587 1701,967) 23,991,600 13828% Tolal Ovorhead CosLv S 35,252,163 S 717,232 S 34,534,951 189 06Y. Overhead Rato (Lass FCC) ° ° 20.7 20Ya 78B OBYe FacAflles Cost of CapiW S 132,889 W �� 0 76� 5 34,88T,840 Overhaad Rale nneludea FCC) ° 19B 83Ye See accorupa�tyuig �roles (Co�tlunred) -Z- PARAMETRIX, INC. AND SUBSIDIARY Corrso/idated Stateiiteat of DPi ect Labor, Frh�ge Beuefrfs att�l Geuei�a! Ove� l�e�d (Coutinrred) Fo�• the Fiscal Year E�rded Dece��tber 30, 2011 Refe� ences Parametrix Adjustments Parametrix inc. Overhead Audited by Clark Nuber A Legal costs incurred in defense of contract pertormance issues per 48 CFR 31.205-47(fl(5)(A); Collection costs unallowabie per 48 CFR 31.205-3, Direct project costs unallowable per 48 CFR 31 202(a) B. Share value based bonuses unallowable per 48 CFR 31 205-6(i); Personal vehtcle use unallowable per 48 CFR 31 205-6(m)(2); Unallowable pr(or penod compensation 31 205-6(a). C Trade show salary cost unallowable per 48 CFR 31 205-1(�(2), Sponsorship cost unallowable per 48 CFR 31.205-1(fx3) D. Advert(sing unallowable per 48 CFR 31.205-1(b) E. Excess lodg�ng and per diem unallowable per 48 CFR 31 208-14, 31 205-46, Entertatnment unalloweble per 48 CFR 31.205-14 F. Fringe beneftts associated wlth labor deemed unaliowable per 48 CFR 31 201-6(e)(2). G. Gifts unallowable per 48 CFR 31 205-13(b). H Entertainment unallowable per 48 CFR 31 205-14, Excess per diem unallowable per 48 CFR 31.205-06. I. Advertising unallowable per 48 CFR 31.205-1(b). J. Local meals unallowable per 48 CFR 31 205-14 K. Personal use portion of vehicle allowanae per 4B CFR 31205-6(m)(2) L. Excess lodging and per d(em unallowable per 48 CFR 31 205-46; Entertainment unallowable per 48 CFR 31.205-14 M Dues to social clubs unallawable per 48 CFR 31 205-1(�(7), 31 205-14; Lobbying unallowable per 48 CFR 31 205-22. N. DonaUon unallowable per 48 CFR 31.205-8. O Excess per d(em unallowable per 48 CFR 31 206-46; Aicohol unalloweble per 48 CFR 31 205-51 P. Dfrect proJect costs unallowable per 48 CFR 31.202(a). Q. Dlrect proJect costs unallowable per 48 CFR 31.202(a). R. Excess lodging and per diem unallowable per 48 CFR 31 205-48. 5 Legal costs incurred in defense of contract performance issues per 48 CFR 31 205-47(fl(5)(A), 31 201- 6(a); Dfrect proJect costs unallowabie per 48 CFR 31 202(a). T Direct project costs unallowable per 48 CFR 31.202(a). U Bad debt unallowable per 48 CFR 3�1.205-3. V Interest unaliowable per 48 CFR 31 2Q5-20, Penalties unallowable per 48 CFR 31.205-15(a). W. Cost of money adjustments per 48 CFR 31 205-10(a). See acconipa�rying rrotes. -3- Exhibit H Title VI Assurances Durmg the performance of this AGREEMENT, the CONSULTANT, for itself, its ass�gnees, and successors m mterest agrees as follows Compliance wrth Regulations The CONSULTANT shall comply wrth the Regulations relative to non- discrimmation m federally assisted programs of the AGENCY, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time (heremafter referred to as the "REGULATIONS"), which are herem mcorporated by reference and made a part of this AGREEMENT Non-discrimmation The CONSULTANT, wrth regard to the work performed durmg the AGREEMENT, shall not discrimmate on the grounds of race, color, sex, or national origm m the selection and retention of sub-consultants, mcludmg procurement of materials and leases of equ�pment The CONSULTANT shall not participate erther directly or mdirectly m the discrimmation prohibrted by Section 21 5 of the REGULATIONS, mcludmg employment practices when the AGREEMENT covers a program set forth m Appendix B of the REGULATIONS Solicitations for Sub-consultants, Includmg Procurement of Materials and Equipment In all solicitations either by competitive biddmg or negotiations made by the CONSIJLTANT for work to be performed under a sub-contract, mcludmg procurement of mater�als or leases of equipment, each potential sub- consultant or suppl�er shall be notified by the CONSULTANT of the CONSULTANT'S obligations under this AGREEMENT and the REGULATIONS relative to non-discnmmation on the grounds of race, color, sex, or nahonal origm 4 Information and Reports The CONSiJLTANT shall provide all mformation and reports required by the REGULATIONS or directives �ssued pursuant thereto, and shall permit access to rts books, records, accounts, other sources of mformation, and rts facilities as may be determmed by AGENCY, STATE or the Federal Highway Admmistration (FHWA) to be pertment to ascertam compliance wrth such REGULATIONS, orders and mstructions Where any mformation required of a CONSULTANT �s m the exclusive possession of another who fails or refuses to furnish th�s mformation, the CONSULTANT shall so certify to the AGENCY, STATE or the FHWA as appropriate, and shall set forth what efforts it has made to obtam the mformation Sanctions for Non-compliance In the event of the CONSULTANT'S non-compliance with the non- discrimmation provisions of th�s AGREEMENT, the AGENCY shall impose such AGREEMENT sanctions as it, the STATE or the FHWA may determme to be appropriate, mcludmg, but not limited to Withholdmg of payments to the CONSiJLTANT under the AGREEMENT until the CONSiJLTANT comphes, and/or, ' Cancellation, termmation, or suspension of the AGREEMENT, m whole or m part DOT Form 140-089 EF Exhibit H Revised 6/O5 Incorporation of Provisions The CONSULTANT shall mclude the provisions of paragraphs (1) through (5) m every sub-contract, mcludmg procurement of materials and leases of equipment, unless exempt by the REGULATIONS, or direchves issued pursuant thereto The CONSULTANT shall take such action wrth respect to any sub-consultant or procurement as the AGENCY, STATE or FHWA may direct as a means of enforcmg such prov�sions mcludmg sanctions for non-compl�ance Provided, however, that m the event a CONSiJLTANT becomes mvolved m, or �s threatened wrth, lit�gation wrth a sub-consultant or supplier as a result of such direction, the CONSiJLTANT may request the AGENCY and the STATE enter mto such litigat�on to protect the mterests of the AGENCY and the STATE and, m addition, the CONSULTANT may request the Umted States enter mto such litigation to protect the mterests of the Umted States �_ Exhibit I Payment Upon Termination of Agreement By the Agency Other Than for Fault of the Consultant (Refer to Agreement, Section IX) Lump Sum Contracts A final payment shall be made to the CONSULTANT which when added to any payments previously made shall total the same percentage of the Lump Sum Amount as the work completed at the time of termmation is to the total work required for the PROJECT In addition, the CONSULTANT shall be paid for any authonzed extra work completed Cost Plus Fixed Fee Contracts A final payment shall be made to the CONSULTANT which when added to any payments previously made, shall total the actual costs plus the same percentage of the fixed fee as the work completed at the time of termmation �s to the total work required for the Pro�ect In add�tion, the CONSULTANT shall be paid for any author�zed extra work completed Specific Rates of Pay Contracts A final payment shall be made to the CONSULTANT for actual hours charged at the time of termmation of this AGREEMENT plus any direct nonsalary costs mcurred at the time of termmation of th�s AGREEMENT Cost Per Unit of Work Contracts A final payment shall be made to the CONSiJLTANT for actual umts of work completed at the time of termmation of this AGREEMENT DOT Fortn 140-089 EF Exhibit I Rewsed 6/05 Exhibit K Consultant Claim Procedures , The purpose of this exhibit is to describe a procedure regardmg claim(s) on a consultant agreement The followmg procedures should only be ut�lized on consultant claims greater than $1,000 If the consultant's claim(s) are a total of $1,000 or less, it would not be cost effective to proceed through the outlined steps It �s suggested that the Director of Public Works or Agency Engmeer negotiate a fair and reasonable price for the consultant's cla�m(s) that total $1,000 or less This e�ibit will outlme the procedures to be followed by the consultant and the agency to consider a potential claim by the consultant Step 1— Consultant Files a Claim with the Agency Pro�ect Manager If the consultant determmes that they were requested to perform add�tional services that were outside of the agreement's scope of work, they may be entitled to a claim The first step that must be completed is the request for consideration of the claim to the Agency's pro�ect manager The consultant's claim must outlme the followmg • Summation of hours by class�ficarion for each firm that is mcluded m the claim, • Any correspondence that directed the consultant to perform the additional work, • T�meframe of the additional work that was outside of the pro�ect scope, • Summary of d�rect labor dollars, overhead costs, profit and reimbursable costs assoc�ated with the additional work, and • Explanation as to why the consultant believes the additional work was outside of the agreement scope of work Step 2— Review by Agency Personnel Regardmg the Consultant's Cla�m for Addrtional Compensation After the consultant has completed step 1, the next step m the process is to forward the request to the Agency's pro�ect manager The pro�ect manager will review the consultant's claim and will met w�th the Director of Public Works or Agency Engmeer to determme if the Agency agrees w�th the claim If the FHWA is participatmg m the pro�ect's fundmg, forward a copy of the consultant's claim and the Agency's recommendahon for federal participahon in the cla�m to the WSDOT H�ghways and Local Programs th"rough the Reg�on Local Programs Engmeer If the cla�m is not el�g�ble for federal participation, payment will need to be from agency funds If the Agency pro�ect manager, Director of Public Works or Agency Engmeer, WSDOT H�ghways and Local Programs (if applicable), and FHWA (if applicable) agree w�th the consultant's claim, send a request memo, mcluding backup documentation to the consultant to either supplement the ageement, or create a new agreement for the claim After the request has been approved, the Agency shall write the supplement and/or new agreement and pay the consultant the amount of the cla�m Inform the consultant that the final payment for the agreement is sub�ect to audrt No further actiom m �eeded regardmg the claim procedures DOT Fortn 140-089 EF Exhibit K Rewsed 6/OS If the Agency does not agree with the consultant's claim, proceed to step 3 of the procedures Step 3— Preparation of Support Documentation Regardmg Consultant's Claim(s) If the Agency does not agee with the consultant's claim, the pro�ect manager shall prepare a summary for the Director of Public Works or Agency Engmeer that mcluded the followmg • Copy of mformation supplied by the consultant regardmg the cla�m, • Agency's summation of hours by classification for each firm that should be mcluded m the cla�m, • Any correspondence that d�rected the consultant to perform the additional work, • Agency's summary of direct labor dollars, overhead costs, profit and reimbursable costs associated with the additional work, • Explanation regardmg those areas m which the Agency does/does not agree with the consultant's claim(s), • Explanahon to describe what has been mst�tuted to preclude future consultant claim(s), and • Recommendat�ons to resolve the claim Step 4— Director of Public Works or Agency Engmeer Revtews Consultant Claim and Agency Documentation The Director of Pub�c Works or Agency Engmeer shall review and admimstratively approve or disapprove the claim, or porttons thereof, which may mclude gettmg Agency Council or Commission approval (as appropriate to agency dispute resolution procedures) If the pro�ect mvolves federal participation, obtam concurrence from WSDOT Highways and Local Programs and FHWA regardmg final settlement of the claim If the claim is not el�g�ble for federal participation, payment will need to be from agency funds Step 5— Informmg Consultant of Decision Regardmg the Cla�m The Director of Public Works or Agency Engineer shall notify (m writmg) the consultant of their final decision regardmg the consultant's claim(s) Include the final dollar amount of the accepted claim (s) and rationale utilized for the dec�sion Step 6— Preparation of Supplement or New Agreement for the ConsultanYs Claim(s) The agency shall write the supplement andlor new agreement and pay the consultant the amount of the claim Inform the consultant that the final payment for the agreement is sub�ect to audit Exhibit M-1(a) Certification Of Consultant Pro�ect No Local Agency I hereby certify that I am ��,�� s��� and duly authorized whose address is representative of the firm of Parametrix, Inc 4660 Krtsap Way, Ste A, Bremerton, WA 98312 firm I here represent has and that neither I nor the above (a) Employed or retamed for a comm�ssion, percentage, brokerage, contmgent fee, or other consideration, any firm or person (other than a bona fide employee working solely for me or the above CONSULTANT) to solicrt or secure the AGREEMENT, (b) Agreed, as an express or �mplied condition for obtammg this contract, to employ or retam the services of any firm or person m connection with carrymg out this AGREEMENT, or (c) Paid, or agreed to pay, to any firm, orgamzation or person (other than a bona fide employee workmg'solely for me or the above CONSULTANT) any fee, contribution, donation, or consideration of any kind for, or m connection wrth, procurmg or carrymg out this AGREEMENT, except as hereby expressly stated (if any), I acknowledge that this certificate is to be available to the Washmgton State Deparhnent of Transportation and the Federal Highway Admmistration, U S Department of Transportation m connection wrth this AGREEMENT mvolvmg participation of Federal-a�d highway funds, and is sub�ect to applicable State and Federal laws, both crimmal and civil /-3/-�3 �, � � Signature DOT Form 140-089 EF F�dnbit M-1(a) Revised 6/05 / Exhibit M-1(b) Certification Of Agency Official I hereby certify that I am the AGENCY Official of the Local Agency of City of Bremerton Washmgton, and that the consultmg firm or �ts representative has not been required, directly or mdirectly as an express or implied condrtion m connection wrth obtammg or cariymg out this AGREEMENT to (a) Employ or retam, or agree to employ to retam, any firm or person, or (b) Pay, or agree to pay, to any firm, person, or orgamzation, any fee, contribution, donation, or cons�deration of any kmd, except as hereby expressly stated (�f any) I acknowledge that this certificate is to be available to the Washmgton State Department of Transportation and the Federal Highway Admmistration, U S Department of Transportat�on, m connection with this AGREEMENT mvolvmg participation of Federal-aid highway funds, and is sub�ect to applicable State and Federal laws, both crimmal and civil ��� �6� Date � ignature DOT Fortn 140-089 EF Exhibit M-1(b) Revised 6/05 Exhibit M-2 Certification Regarding Debarment, Suspension, and Other Responsibility Matters-Primary Covered Transactions The prospective primary participant certifies to the best of its knowledge and belief, that �t and its pnncipals A Are not presently debarred, suspended, proposed for debarment, declared meligible, or voluntarily excluded from covered transactions by any federal department or agency, B Have not wrthm a three-year period precedmg this proposal been convicted of or had a civil �udgment rendered agamst them for commission or fraud or a cnmmal offense m connection wrth obtammg, attemptmg to obtam, or performmg a public (federal, state, or local) transaction or contract under a public transaction, violation of federal or state antitrust statues or commission of embezzlement, theft, forgery, bnbery, falsification or destruction of records, malcmg false statements, or receivmg stolen property, C Are not presently mdicted for or otherwise crimmally or civ�lly charged by a governmental entrty (federal, state, or local) wrth commission of any of the offenses enumerated m paragraph (I) (B) of this certificarion, and D Have not wrthm a three (3) year period precedmg th�s application/proposal had one or more public transactions (federal, state, or local) termmated for cause or default II Where the prospective primary partictpant is unable to certify to any of the statements m th�s certification, such prospective participant shall attach an explanation to this proposal Consultant (Firm} p�vnetr�x, Inc /-3/- /3 ��Z� S'l.� (Date) (Signature) President or Authonzed Official of Consultant DOT Fortn 140-089 EF Exhibrt M-2 Revised 6/OS Exhibit M-3 Certification Regarding The Restrictions of The use of Federal Funds for Lobbying The prospective participant certifies, by sigmng and submittmg this bid or proposal, to the best of his or her knowledge and belief, that No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for mfluencmg or attemptmg to mfluence an officer or employee of any Federal agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress m connection with the awardmg of any Federal contract, the malang of any Federal grant, the makmg of any Federal loan, the entermg mto of any cooperative ageement, and the extension, contmuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement 2 If any funds other than Federal appropriated funds have been paid or will be paid to any person for mfluencmg or attemptmg to mfluence an officer or employee of any Federal agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congess m connection wrth this Federal contract, gant, loan, or cooperative agreement, the unders�gned shall complete and submrt Standard Form-LLL, "Disclosure Form to Report Lobbymg," m accordance with its mstructions This certification is a material representation of fact upon which rel�ance was placed when this transaction was made or entered mto Submission of this certification is a prerequisite for makmg or entenng mto th�s transaction imposed by Sectton 1352, Trtle 31, U S Code Any person who fails to file the required cert�fication shall be subJect to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure The prospective partic�pant also agrees by submittmg his or her bid or proposal that he or she shall requtre that the language of this certification be mcluded m all lower tier subcontracts which exceed $100,000 and that all such subrecipients shall certify and d�sclose accordmgly Consultant (Firm) parametrix, Inc � 3 /- �3 � ���Z� (Date) (Signature) President or Authonzed Offiaal of Consultant DOT Form 140-089 EF Exhibit M-3 Revised 6/05 Exhibit M-4 Certificate of Current Cost or Pricing Data , Th�s is to certify that, to the best of my knowledge and belief, the cost or pricmg data (as defined m section 15 401 of the Federal Acquisrtion Regulation (FAR) and required under FAR subsection 15 403-4) subm�tted, erther actually or by specific ident�fication m wrrtmg, to the contractmg officer or to the contracting officer's representat�ve m support of Pacific Avenue Improvements Eng Services * are accurate, complete, and current as of January 31, 2013 ** Th�s certification mcludes the cost or pricmg data supportmg any advance agreements and forward pricmg rate agreements between the offeror and the Government that are part of the proposal Firm Parametrix, Inc Name p � �, � ��!-� u.r� !� Title Semor Consultant Date of Execution*** �— 3/— / 3 * Ident�fy the proposal, quotation, request for price ad�ustment, or other submission mvolved, givtng the appropr�ate identifymg number (e g, RFP No ) ** Insert the day, month, and year when price negotiations were concluded and price agreement was reached *** Insert the day, month, and year of s�gnmg, which should be as close as practicable to the date when the price negotiations were concluded and the contract price was agreed to DOT Form 140-089 EF Exhibit M-4 Revised 6/05