Loading...
HomeMy WebLinkAbout12/12/2012 AGENDA 'IF . I CITY COUNCIL 345 6th Street, Suite 600, Bremerton, WA 98337 I 1 Phone (360) 473 -5280 DECEMBER 12, 2012 CITY COUNCIL SPECIAL MEETING 4:00 PM — STUDY SESSION in COUNCIL CONFERENCE ROOM 603 The Study Session is open to the public but there will be no opportunities for input or participation; no action is anticipated during the Study Session; and the content of these items is subject to change. If approved by Council, the items will be placed on the December 19, 2012 Council Meeting Agenda: A. NO PRESENTATION PLANNED -The following items are budgeted items or have been reviewed by the appropriate Council Committee: 1. 2013 Property Insurance Renewals 2. Purchase of Sensus Water Meter Transceiver Units (MXUs) from Ferguson Waterworks 3. Agreement with Harris Computer Systems for Software Upgrade for Utility Billing and Customer Service Function 4. Appointment of Kevin Matthew to the position of Information Technology Manager at a step higher than Rate 1 in Pay Band 16 5. Acceptance of Interpreter Grant - Interlocal Agreement ICA 133368 6. Public Hearing and Ordinance to adopt the 2012 Comprehensive Plan Amendment Docket B. FULL DISCUSSION ITEMS 7. Amendment to the Interlocal Agreement regarding Emergency Communications and other Services 8. Proposed Ordinance to amend Ordinance No. 5173 establishing the City of Bremerton's Fiscal Year 2012 Budget as amended by Ordinance No. 5186 9. Proposed Ordinance to amend Chapter 9.88 of the Bremerton Municipal Code (BMC) entitled "Marijuana" C. GENERAL COUNCIL BUSINESS D. DISCUSSION ON UTILITY RATE STUDY - Council will reconvene in the Mayor's Conference Room with members of the FCS Group and Utility Rate Study Advisory Committee (Continued from November 14...) E. ADJOURN STUDY SESSION Americans with Disabilities Act accommodations provided upon request. Those requiring special accommodations should contact the City Clerk's Office at (360) 473 -5323 by noon on the Monday preceding the Council meeting. ______________________________________________________________ CITY COUNCIL 345 6th Street, Suite 600, Bremerton, WA 98337 Phone (360) 473-5280 DECEMBER 12, 2012 CITY COUNCIL SPECIAL MEETING 4:00 PM – STUDY SESSION in COUNCIL CONFERENCE ROOM 603 The Study Session is open to the public but there will be no opportunities for input or participation; no action is anticipated during the Study Session; and the content of these items is subject to change. If approved by Council, the items will be placed on the December 19, 2012 Council Meeting Agenda: A. NO PRESENTATION PLANNED - The following items are budgeted items or have been reviewed by the appropriate Council Committee: 1. 2013 Property Insurance Renewals 2. Purchase of Sensus Water Meter Transceiver Units (MXUs) from Ferguson Waterworks 3. Agreement with Harris Computer Systems for Software Upgrade for Utility Billing and Customer Service Function 4. Appointment of Kevin Matthew to the position of Information Technology Manager at a step higher than Rate 1 in Pay Band 16 5. Acceptance of Interpreter Grant - Interlocal Agreement ICA 133368 6. Public Hearing and Ordinance to adopt the 2012 Comprehensive Plan Amendment Docket B. FULL DISCUSSION ITEMS 7. Amendment to the Interlocal Agreement regarding Emergency Communications and other Services 8. Proposed Ordinance to amend Ordinance No. 5173 establishing the City of Bremerton's Fiscal Year 2012 Budget as amended by Ordinance No. 5186 9. Proposed Ordinance to amend Chapter 9.88 of the Bremerton Municipal Code (BMC) entitled "Marijuana" C. GENERAL COUNCIL BUSINESS D. DISCUSSION ON UTILITY RATE STUDY - Council will reconvene in the Mayor's Conference Room with members of the FCS Group and Utility Rate Study Advisory Committee (Continued from November 14…) E. ADJOURN STUDY SESSION Americans with Disabilities Act accommodations provided upon request. Those requiring special accommodations should contact the City Clerk’s Office at (360) 473-5323 by noon on the Monday preceding the Council meeting. AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: 2013 Property Insurance Renewal Study Session Date: Dec. 12, 2012 COUNCIL MEETING Date: Dec. 19, 2012 Department: City Attorney’s Office Presenter: Thelma Swem Phone: 360-473-5302 SUMMARY: The Bremerton Municipal Code authorizes the Risk Management Specialist, with the approval of the City Attorney, to bind property insurance coverage on City assets and requires City Council approval for the continuation of the bound coverage. Property insurance coverage for 2013 has been bound with Lexington Insurance Company. The annual premium for 2013 is $274,660.23. Coverage is subject to a $100,000 deductible for most losses. Earthquake and flood insurance is only provided for the Wastewater Treatment Plant, the Harborside Conference Center, the Harborside Sculptures and Fountains, and PSNS Memorial Plaza. ATTACHMENTS: Summary of Quotes FISCAL IMPACTS (Include Budgeted Amount): Sufficient funds have been budgeted in the Risk Management Fund for this expenditure for 2013. STUDY SESSION AGENDA: ☒ No Discussion ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve continuation of property insurance bound with Lexington Insurance Company for 2013. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 11/02/12 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Purchase of Sensus Water Meter Transceiver Units (MXU’s) Study Session Date: December 12, 2012 COUNCIL MEETING Date: December 19, 2012 Department: PW&U Presenter: Chal Martin Phone: 473-5315 SUMMARY: Due to failing batteries and poor internal wiring of old water meter transmitters, Public Works staff began replacing water meter transceivers with more reliable models two years ago. The City now has almost 1,900 of the new transceivers in service, out of 18,246 in the system. The new transceivers have a 15-year minimum battery life (vs. 6 years for the old transceivers), and improved transceiver range. A sole source upgrade / exchange program has been established with Ferguson Waterworks in Tacoma (Ferguson is the authorized distributor) to purchase new transceivers, with a credit if the purchase is made prior to the end of January, 2013. We have accumulated 1,882 of the old transceivers to turn in for credit. Purchase price for 1,882 new transceivers is $253,637.14, including the credit and including sales tax. ATTACHMENTS: 1. General Information Sheet 2. Transmitter (MXU) upgrade/exchange unit pricing sheet 3. Sole Source Determination 4. Warranty (For information) FISCAL IMPACTS (Include Budgeted Amount): The 2012 Water Utility O&M expense budget is $13,492,749. With this purchase, final 2012 expenditures are projected to be $12,962,880, which is about $100,000 below our previous end-of-year projection for 2013 budget formulation (good). STUDY SESSION AGENDA: ☒ No Discussion ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve the purchase of water meter transceivers from Ferguson Waterworks and authorize the Mayor to finalize and execute the purchase with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 11/02/12 Public Works and Utilities Department 100 Oyster Bay Ave. N.  Bremerton, WA 98312  (360) 473-5315  FAX (360) 473-5360   MEMORANDUM DATE: November 28, 2012 TO: Procurement File FROM: Chal Martin, Public Works & Utilities Director SUBJECT: Sole Source Determination - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - In accordance with Bremerton Municipal Code 2.76.090, Sole Source Purchases, the purpose of this memorandum is to document the necessity of sole source procurement methodology for Sensus 520R water meter transceiver units (MXUs). The City has a requirement to replace aging transmitters on over 18,000 meters in its system. For efficiency of maintenance operations, and for reasons of compatibility with existing meter reading systems, the City chose the Sensus 520R transceiver as its standard for replacement. Establishing a standard enables the City to save money through reduced inventory, and save money and staff time by virtue of reduced maintenance complications that ensue from operating a system with multiple brands and repair parts. Over the past two years, the City has installed approximately 1,900 of the transceiver units, and experience to date indicates the units are of high quality and are exceeding the Utility’s expectations for reliability and performance. Sensus Metering Systems, the manufacturer, contracts with regional suppliers who are the only authorized distributors of the product. Therefore, the only source for the particular transceiver units required by the City, are the regional distributors. Any request for bids would only receive a single bid from the regional distributor. Because the City of Bremerton is a large customer, the regional distributor for this area, Ferguson Waterworks, has agreed to provide a credit for the old meters. Public Works staff has determined that Ferguson’s pricing is reasonable. Therefore, it is my determination that sole source purchase of Sensus 520R water meter transceiver units is justified for this procurement. Sensus Limited Warranty I. General Product Coverage Sensus USA Inc. (“Sensus”) warrants its products and parts to be free from defects in material and workmanship for one (1) year from the date of Sensus shipment and as set forth below. All products are sold to customer (“Customer”) pursuant to Sensus’ Terms of Sale, avail¬able at: http://sensus.com/TC/ (“Terms of Sale”). II. SR II® and accuSTREAM™ 5/8”, 3/4” & 1” Meters… are warranted to perform to AWWA New Meter Accuracy Standards for fi ve (5) years from the date of Sensus shipment or until the regis¬tration shown below, whichever occurs fi rst. Sensus further warrants that the SR II meter will perform to at least AWWA Repaired Meter Accuracy Standards for fi fteen (15) years from the date of Sensus shipment or until the registration shown below, whichever occurs fi rst: New Meter Accuracy Repair Meter Accuracy 5/8” SR II Meter and accuSTREAM Meter 500,000 gallons 1,500,000 gallons 3/4” SR II Meter and accuSTREAM Meter 750,000 gallons 2,250,000 gallons 1” SR II Meter and accuSTREAM Meter 1,000,000 gallons 3,000,000 gallons III. SR® 5/8”, 3/4” & 1” Meters… are warranted to perform to AWWA New Meter Accuracy Standards for one (1) year from the date of Sensus shipment. Sensus further warrants that the 5/8”, 3/4” and 1” SR meter will perform to at least AWWA Repaired Meter Accuracy Standards for fi fteen (15) years from the date of Sensus shipment or until the registration shown below, whichever occurs fi rst: Repair Meter Accuracy 5/8” SR Meter 1,500,000 gallons 3/4” SR Meter 2,250,000 gallons 1” SR Meter 3,000,000 gallons IV. SR 1-1/2” & 2” Meters… are warranted to perform to AWWA New Meter Accuracy Standards for one (1) year from the date of Sensus shipment. Sensus further warrants that the 1-1/2” and 2” SR meter will per¬form to at least AWWA Repaired Meter Accuracy Standards for ten (10) years from the date of Sensus shipment or until the registration shown below, whichever occurs fi rst: Repair Meter Accuracy 1-1/2” SR Meter 5,000,000 gallons 2” SR Meter 8,000,000 gallons V. PMM® 5/8”, 3/4”, 1” Meters… are warranted to perform to AWWA New Meter Accuracy Standards for one (1) year from the date of Sensus shipment. Sensus further warrants that the 5/8”, 3/4”, and 1” PMM meter will perform to at least AWWA Repaired Meter Accuracy Standards for fi fteen (15) years from the date of Sensus shipment or until the registration shown below, whichever occurs fi rst: Repair Meter Accuracy 5/8” PMM 1,500,000 gallons 3/4” PMM 2,000,000 gallons 1” PMM 3,000,000 gallons VI. PMM 1-1/2”, 2” Meters… are warranted to perform to AWWA New Meter Accuracy Standards for one (1) year from the date of Sensus shipment. Sensus further warrants that the 1-1/2”, and 2” PMM meter will perform to at least AWWA Repaired Meter Accuracy Standards for ten (10) years from the date of Sensus shipment or until the registration shown below, whichever occurs fi rst: Repair Meter Accuracy 1-1/2” PMM 5,000,000 gallons 2” PMM 8,000,000 gallons VII. iPERL™ Water Management Systems... that register water fl ow are warranted to perform to the accuracy levels set forth in the iPERL Water Management System Data Sheet (IPL-110), available at www. sensus.com/iperl or by request from 1-800-METER-IT, for twenty (20) years from the date of Sensus shipment. The iPERL System warranty does not include the external housing. VIII. Maincase… of the SR, SR II and PMM in both standard and low lead alloy meters are warranted to be free from defects in material and work¬manship for twenty-fi ve (25) years from the date of Sensus shipment. Composite and E-coated maincases will be free from defects in mate¬rial and workmanship for fi fteen (15) years from the date of Sensus shipment. IX. Sensus “W” Series Turbo Meters, OMNI™ Me¬ters and Propeller Meters… are warranted to perform to AWWA New Meter Accuracy Standards for one (1) year from the date of Sensus shipment. X. Sensus accuMAG™ Meters... are warranted to be free from defects in material and workmanship, under normal use and service, for 18 months from the date of Sensus shipment or 12 months from startup, whichever occurs fi rst. XI. Sensus Registers… are warranted to be free from defects in material and workmanship from the date of Sensus shipment for the periods stated below or until the applicable registration for AWWA Repaired Meter Accuracy Standards, as set forth above, are surpassed, whichever occurs fi rst: 5/8” thru 2” SR, SR II, PMM, accuSTREAM Standard Registers 25 years 5/8” thru 2” SR, SR II, PMM, accuSTREAM Encoder Registers 10 years Electronic Communication Index (ECI) 10 years All HSPU, IMP Contactor, R.E.R. Elec. ROFI 1 year Standard and Encoder Registers for: “W” Turbo and Propeller Meters 1 year OMNI Register with Battery 10 years XII. Sensus Electric Meters… are warranted to be free from defects in material and workmanship for one (1) year from the date of Sensus shipment. Spare parts and components are warranted to be free from defects in material and workmanship for one (1) year from the date of Sensus shipment. Repaired or refurbished equipment repaired by Sensus is warranted to be free from defects in material and workmanship for ninety (90) days from the date of Sensus shipment or for the time remaining on the original warranty period, whichever is longer. XIII. Batteries, iPERL System Components, AMR and FlexNet™ System AMI Interface Devices… are warranted to be free from defects in material and workmanship from the date of Sensus shipment for the period stated below: Electronic TouchPads 10 years RadioRead® MXU (Model 505C, 510R or 520R) and Batteries 20 years* Act-Pak® Instrumentation 1 year TouchRead® Coupler and AMR Equipment 1 year FlexNet Water or Gas SmartPoint™ Modules and Batteries 20 years* Hand Held Device 1 year Vehicle Gateway Base Station 1 year FlexNet Base Station 1 year Echo Transceiver 1 year (continued) G-500 R16 XIII. Batteries, iPERL System Components, AMR and FlexNet™ System AMI Interface Devices… (continued) Remote Transceiver 1 year iConA and FlexNet Electricity SmartPoint Module 1 year iPERL System Battery and iPERL System Components 20 years* * Sensus will repair or replace non-performing: • RadioRead® MXU (Model 505C, 510R and 520R) and Batteries, • FlexNet Water or Gas SmartPoint Modules (confi gured to the factory setting of six transmissions per day) and batteries, • iPERL System Batteries, and/or the iPERL System fl owtube, the fl ow sensing and data processing assemblies, and the register (“iPERL System Components”) at no cost for the fi rst ten (10) years from the date of Sensus ship¬ment, and for the remaining ten (10) years, at a prorated percentage, applied towards the published list prices in effect for the year product is accepted by Sensus under warranty conditions according to the following schedule: Years Replacement Price Years Replacement Price 1-10 0% 16 55% 11 30% 17 60% 12 35% 18 65% 13 40% 19 70% 14 45% 20 75% 15 50% >20 100% Note: Software supplied and licensed by Sensus is warranted accord¬ing to the terms of the applicable software license agreement. Sensus warrants that network and monitoring services shall be performed in a professional and workmanlike manner. XIV. Return… Sensus’ obligation, and Customer’s exclusive remedy, under this Sensus Limited Warranty is, at Sensus’ option, to either (i) repair or replace the product, provided the Customer (a) returns the product to the location designated by Sensus within the warranty period; and (b) prepays the freight costs both to and from such location; or (ii) deliver replacement components to the Customer, provided the Customer installs, at its cost, such components in or on the product (as instructed by Sensus). The return of products for warranty claims must follow Sensus’ Returned Materials Authorization (RMA) procedures. Water meter returns must include documentation of the Customer’s test results. Test results must be obtained according to AWWA standards and must specify the meter serial number. The test results will not be valid if the meter is found to contain foreign materials. If Customer chooses not to test a Sensus water meter prior to returning it to Sen¬sus, Sensus will repair or replace the meter, at Sensus’ option, after the meter has been tested by Sensus. The Customer will be charged Sensus’ then current testing fee. Sensus SmartPoints modules and MXU’s returned must be affi xed with a completed return evaluation label. For all returns, Sensus reserves the right to request meter read¬ing records by serial number to validate warranty claims. For products that have become discontinued or obsolete (“Obsolete Product”), Sensus may, at its discretion, replace such Obsolete Product with a different product model (“New Product”), provided that the New Product has substantially similar features as the Obsolete Product. The New Product shall be warranted as set forth in this Sensus Limited Warranty. THIS SECTION XIV SETS FORTH CUSTOMER’S SOLE REMEDY FOR THE FAILURE OF THE PRODUCTS, SERVICES OR LICENSED SOFT¬WARE TO CONFORM TO THEIR RESPECTIVE WAR¬RANTIES. XV. Warranty Exceptions and No Implied Warranties… This Sensus Limited Warranty does not include costs for removal or instal¬lation of products, or costs for replacement labor or materials, which are the responsibility of the Customer. The warranties in this Sensus Limited Warranty do not apply to goods that have been: installed improperly or in non-recommended installations; installed to a socket that is not functional, or is not in safe operating condition, or is damaged, or is in need of repair; tampered with; modifi ed or repaired with parts or assemblies not certifi ed in writing by Sensus, including without limitation, communication parts and assemblies; improperly modifi ed or repaired (including as a result of modifi cations required under section XIV); converted; altered; damaged; read by equipment not approved by Sensus; for water meters, used with substances other than water, used with non-potable water, or used with water that contains dirt, debris, deposits, or other impurities; subjected to misuse, improper storage, improper care, improper maintenance, or improper periodic testing (collectively, “Exceptions.”). If Sensus identifi es any Exceptions during examination, troubleshooting or performing any type of support on behalf of Customer, then Customer shall pay for and/or reimburse Sensus for all expenses incurred by Sensus in examining, troubleshooting, performing support activities, repairing or replacing any Equipment that satisfi es any of the Exceptions defi ned above. The above warranties do not apply in the event of Force Majeure, as defi ned in the Terms of Sale. THE WARRANTIES SET FORTH IN THIS SENSUS LIMITED WARRANTY ARE THE ONLY WARRANTIES GIVEN WITH RESPECT TO THE GOODS, SOFTWARE LICENSES AND SERVICES SOLD OR OTHERWISE PROVIDED BY SENSUS. SENSUS EXPRESSLY DISCLAIMS ANY AND ALL OTHER REPRESENTATIONS AND WARRANTIES, INCLUDING WITHOUT LIMITATION, WARRANTIES AS TO FITNESS FOR A PARTICULAR PURPOSE, MERCHANTABILITY, NON- INFRINGEMENT AND TITLE. SENSUS ASSUMES NO LIABILITY FOR COSTS OR EXPENSES ASSOCIATED WITH LOST REVENUE OR WITH THE REMOVAL OR INSTALLATION OF EQUIPMENT. THE FOREGOING REMEDIES ARE CUSTOMER’S SOLE AND EXCLUSIVE REMEDIES FOR THE FAILURE OF EQUIPMENT, LICENSED SOFTWARE OR SERVICES TO CONFORM TO THEIR RESPECTIVE WARRANTIES. XVI. Limitation of Liability... SENSUS’ AGGREGATE LIABILITY IN ANY AND ALL CAUSES OF ACTION ARISING UNDER, OUT OF OR IN RELATION TO THIS AGREEMENT, ITS NEGOTIATION, PERFORMANCE, BREACH OR TERMINATION (COLLECTIVELY “CAUSES OF ACTION”) SHALL NOT EXCEED THE TOTAL AMOUNT PAID BY CUSTOMER TO SENSUS UNDER THIS AGREEMENT. THIS IS SO WHETHER THE CAUSES OF ACTION ARE IN TORT, INCLUDING, WITHOUT LIMITATION, NEGLIGENCE OR STRICT LIABILITY, IN CONTRACT, UNDER STATUTE OR OTHERWISE. AS A SEPARATE AND INDEPENDENT LIMITATION ON LIABILITY, SENSUS’ LIABILITY SHALL BE LIMITED TO DIRECT DAMAGES. SENSUS SHALL NOT BE LIABLE FOR: (I) ANY INDIRECT, INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES; NOR (II) ANY REVENUE OR PROFITS LOST BY CUSTOMER OR ITS AFFILIATES FROM ANY END USER(S), IRRESPECTIVE OF WHETHER SUCH LOST REVENUE OR PROFITS IS CATEGORIZED AS DIRECT DAMAGES OR OTHERWISE; NOR (III) ANY IN/OUT COSTS; NOR (IV) MANUAL METER READ COSTS AND EXPENSES; NOR (V) DAMAGES ARISING FROM MAINCASE OR BOTTOM PLATE BREAKAGE CAUSED BY FREEZING TERMPERATURES, WATER HAMMER CONDITIONS, OR EXCESSIVE WATER PRESSURE. “IN/OUT COSTS” MEANS ANY COSTS AND EXPENSES INCURRED BY CUSTOMER IN TRANSPORTING GOODS BETWEEN ITS WAREHOUSE AND ITS END USER’S PREMISES AND ANY COSTS AND EXPENSES INCURRED BY CUSTOMER IN INSTALLING, UNINSTALLING AND REMOVING GOODS. “END USER” MEANS ANY END USER OF ELECTRICITY/WATER/GAS THAT PAYS CUSTOMER FOR THE CONSUMPTION OF ELECTRICITY/WATER/GAS, AS APPLICABLE. The limitations on liability set forth in this Agreement are fundamental inducements to Sensus entering into this Agreement. They apply unconditionally and in all respects. They are to be interpreted broadly so as to give Sensus the maximum protection permitted under law. To the maximum extent permitted by law, no Cause of Action may be instituted by Customer against Sensus more than TWELVE (12) MONTHS after the Cause of Action fi rst arose. In the calculation of any damages in any Cause of Action, no damages incurred more than TWELVE (12) MONTHS prior to the fi ling of the Cause of Action shall be recoverable. 8601 Six Forks Road, Suite 700 Raleigh, NC 27615 1-800-638-3748 Sensus Limited Warranty AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Software Upgrade for Utility Billing and Customer Service Function Study Session Date: 12/12/12 COUNCIL MEETING Date: 12/19/12 Department: Public Works Presenter: Chal Martin Phone: 473-5315 SUMMARY: : In 2006, the City upgraded the utility billing software to a Harris product called InHance. In 2009 a Federal Regulation (Red Flag Identity Theft) went into effect which required Harris to upgrade their software to incorporate better identity security and encryption. The requested council action is upgrade/replacement of the InHance software to a new format called ICIS. The ICIS software uses a different technology (.NET, a windows environment) that includes faster processing, faster debugging mechanisms, enhanced reporting and a better internal security structure. It is important that we do this upgrade since Harris has indicated they will no longer support the older InHance software in the future. Our original purchase of the InHance software allowed for upgrades at no cost; however, change to the new .NET technology will require in-house training and programming of our custom forms. The cost of this Agenda Item is limited to training, programming and installation. ATTACHMENTS: 1. Proposal FISCAL IMPACTS (Include Budgeted Amount): The cost of the software upgrade, training, and programming is $22,950. Additional costs may accrue during software installation; however, these costs are expected to be minimal. The 2012 budgeted amount for this software upgrade was $20,000 -- $10,000 from the Water Utility and $10,000 from the Sewer Utility. This request exceeds the 2012 budgeted amount but will not cause either fund to exceed our previously-projected year-end balances; therefore, no budget amendment is needed. STUDY SESSION AGENDA: ☒ No Discussion ☐ Full Presentation STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve an agreement with Harris Computer Systems for upgrade of the City’s utility billing software, and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 11/02/12 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Appointment of Kevin Matthew to the position of Information Technology Manager at a step higher than Rate 1 in Pay Band 16. Study Session Date: December 12, 2012 COUNCIL MEETING Date: December 19, 2012 Department: Financial Services Presenter: Becky Hasart Phone: 360-473-5722 SUMMARY: The current Information Technology (IT) Manager will be retiring at the end of December after having been with the City for over 29 ½ years. The Director of Financial Services has been working with the IT Manager on identifying those within existing IT staff that could be groomed to become a replacement for when the retirement would become effective (succession planning). As such, our current Network Administrator, Kevin Matthew, is being appointed to the IT Manager position effective January 1, 2013. Mr. Matthew has been employed by the City of Bremerton for 23 years including 2 years as a Computer Programmer Analyst and 21 years as the Network Administrator. Over the last six months, Mr. Matthew has shown he has the knowledge and experience to be able to perform the manager’s job and can step into this new role with minimal disruption to City services. The IT Manager’s pay band is non-represented pay band 16. Step 1 would only increase Mr. Matthew’s salary by $142 per month. To acknowledge the promotion and to have the pay be more commiserate with the increase in responsibility and duties, it is recommended that Mr. Matthew be placed at pay band 16, step 2. Per BMC 2.50.032(a), City Council must approve the initial salary of a newly hired person if the starting salary exceeds step 1. ATTACHMENTS: Letter of engagement and Mr. Matthew’s resume. FISCAL IMPACTS (Include Budgeted Amount): Position is fully funded. STUDY SESSION AGENDA: ☒ No Discussion ☐ Full Presentation STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to appoint Kevin Matthew to Information Technology Manager at Pay Band 16 Step 2 rate. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 11/02/12 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: ACCEPTANCE OF INTERPRETER GRANT – INTER-LOCAL AGREEMENT ICA13368 Study Session Date: 12/12/2012 COUNCIL MEETING Date: 12/19/2012 Department: MUNICIPAL COURT Presenter: DAWN NELSON Phone: 360 473-5242 SUMMARY: The Bremerton Municipal Court has been the recipient of an Interpreter Grant from the State of Washington, Administrative Office of the Courts for many years. This agreement is renewed on a yearly basis. This document is titled an Inter-Local Agreement but it more correctly a grant acceptance form. The terms of this Agreement are from July 2012 through June 2013 for reimbursement of interpreter services up to a maximum of $2,841.53. ATTACHMENTS: Inter-Local Cooperative Agreement – ICA13368 between State of Washington, Administrative Offices of the Court and Bremerton Municipal Court. FISCAL IMPACTS (Include Budgeted Amount): Receipt of $2,841.53. No matching funds are required and there will be no expense to the City. STUDY SESSION AGENDA: X No Discussion ☐ Full Presentation STUDY SESSION ACTION: X Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve the Inter-Local Agreement between the City of Bremerton and the State of Washington, Administrative Office of the Courts and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 11/02/12 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Public Hearing and Ordinance No. 5202 to adopt the 2012 Comprehensive Plan Amendment Docket. Study Session Date: November 28, 2012 COUNCIL MEETING Date: December 19, 2012 Department: DCD Presenter: D. McIntyre; A. Daniels Phone: 360-473-5845 SUMMARY: The action before the Council is to conduct a public hearing to consider the proposed 2012 Comprehensive Plan Amendments. The amendment docket contains: 1) amendments to the Downtown Regional Center Subarea Plan to include three parcels located at the corner of Burwell Street and Warren Avenue in the Downtown Regional Center boundaries to be eligible for re-zone to Warren Avenue Corridor (WC) zoning designation; 2) amendments to the Bay Vista Subarea Plan as follows: reallocation of Village Commercial and multi-family locations; revise permitted land uses to reflect land use zones that are being condensed; revise complex Code requirements in Subarea Plan to more resemble the City of Bremerton Zoning Code; and alter landscaping, signage and parking requirements which will still comply with overall policies and goals of the existing Bay Vista Subarea Plan. The two amendment docket items are a result of applications received from interested parties. ATTACHMENTS: 1) Staff Memo 2) Planning Commission Minutes from July 17, 2012 Planning Commission Workshop; September 18, 2012 Planning Commission Workshop; and October 9, 2012 Planning Commission Public Hearing 3) Proposed Ordinance No. 5202 Exhibit A—Planning Commission Findings and Conclusions Exhibit B—Downtown Regional Center Subarea Plan Amendment Exhibit C—Bay Vista Subarea Plan Amendment FISCAL IMPACTS (Include Budgeted Amount): None. STUDY SESSION AGENDA: ☐ No Discussion ☒ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☒ Public Hearing RECOMMENDED MOTION: Move to pass Ordinance No. 5202 adopting the 2012 amendments to the Comprehensive Plan. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 11/02/12 Attachment 1 From:  Doug McIntyre, City Planner; Allison Daniels, City Planner  Date:  November 28, 2012  Re:  2012 Comprehensive Plan Amendment Docket    EXECUTIVE SUMMARY  Staff and the Planning Commission are pleased to present the proposed 2012 Comprehensive Plan  Amendment docket for Council consideration.  State and City statutes allow the Comprehensive Plan  to be amended a maximum of once per year (not including adoption of new Subarea Plans). Each of  the proposed Comprehensive Plan amendments must show consistency with the criteria contained in  BMC 20.10.080.     The Planning Commission conducted a Public Hearing on the amendments and recommends the  Council adopt the changes. The Commission has passed findings and conclusions (See Ordinance  Exhibit A) that demonstrate the consistency with the criteria outlined in BMC 20.10.080, and  includes policies in the Comprehensive Plan to support the proposed changes.     The 2012 Docket includes two amendments as follows:    DOCKET ITEMS  1. On April 2, 2012, Rice Fergus Miller Inc., acting as agent for the property owner,  submitted a request for land use change. Three parcels, located at 1008, 1016, and 1018  Burwell Street (at the corner of Burwell Street and Warren Avenue, see Attachment I),  currently designated Low‐Density Residential, are proposed to be included in the  Downtown Regional Center boundaries.  Development in the Downtown Regional Center  is guided by the Downtown Regional Center Subarea Plan (adopted on December 19,  2007 by Ordinance 5034).      The Downtown Regional Center Subarea Plan directs focused, mixed growth according to  the City's Comprehensive Plan vision for downtown as the "Metropolitan Center of the  West Puget Sound." The Subarea Plan includes design standards, zoning, and streetscape  standards for the greater downtown area.    DEPARTMENT OF COMMUNITY DEVELOPMENT MEMORANDUM Attachment 1 The development of the Downtown Regional Center Subarea Plan included a focus on  the Warren Avenue Corridor, located along the west edge of the center. This corridor  was envisioned to provide a commercial district of medium intensity to transition to  lower scaled uses outside of the downtown, as specified by the Warren Avenue Corridor  zone (WC zone). However, implementation of this vision is difficult with the existing  boundaries because the western side of the Warren Avenue Corridor is only one parcel  deep, inhibiting, in many cases, the ability to build medium density uses as specified by  the WC zone. To better implement what was envisioned for this area, a proposal to add  three parcels to the Downtown Regional Center boundaries would allow ample space to  accommodate development intended to occur under the original Subarea Plan.     The three parcels are currently developed with vacant multi‐family residential units and  the current zoning designation is R‐10; the Comprehensive Plan Land Use designation is  Low‐Density Residential.  The underutilized nature of the properties presents an  opportunity, if re‐designated, to revitalize the edge of the downtown core by allowing a  redevelopment pattern to occur that the current Low Density Residential designation  does not allow.  Impacts on neighboring parcels along Burwell Street are anticipated to  be minimal, due to the sparse nature of development on the block as well as the mix of  existing uses, including single‐family, multi‐family, parking, and undeveloped lots.  Additionally, the WC Zone is intended to provide a commercial district of medium  intensity to transition to lower‐scaled uses outside of the downtown core, which will  ensure that development on the subject parcels will be done in a manner that minimizes  impacts on the surroundings.     Once included in the Downtown Regional Center Subarea Plan, these three parcels will  be eligible for rezoning to the WC zoning designation as set forth in the Subarea Plan. See  Ordinance Exhibit B.    2. The second amendment to this docket is the revisions to the Bay Vista Subarea Plan.  Originally this plan was called the West Park Subarea Plan and was adopted in 2007. In  2009, the applicant, the Bremerton Housing Authority (BHA), revised the subarea plan  and is now known as the Bay Vista Subarea Plan.    The Bay Vista Subarea Plan was created in consultation with stakeholders, residents, and  neighbors. It used an intensive design charette process and numerous community  meetings. Development of the Subarea Plan also used environmental analysis, including  preparation of a SEPA/NEPA environmental Impact Statement (EIS), and an EIS  addendum, to inform master planning of the site consistent with environmental  constraints and opportunities.    However, as the site is being developed, market conditions and site constraints have  made the regulations of the existing Subarea Plan difficult to implement. BHA is  proposing amendments to the Bay Vista Subarea Plan that includes: reallocation of  Attachment 1 Village Commercial and multi‐family locations, revise permitted land uses to reflect land  use zones that are being condensed, revise complex Code requirements in Subarea Plan  to more resemble the City of Bremerton Zoning Code, and alter landscaping, signage and  parking requirements which will still comply with overall policies and goals of the existing  Bay Vista Subarea Plan.     The revised and updated Bay Vista Plan is contained in the proposed Ordinance Exhibit  C.  Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Attachment 2 Exhibit A Exhibit A Exhibit A Exhibit A Exhibit A Exhibit A Exhibit C: Proposed Bay Vista Subarea Plan Bay V ista SUB-AREA PLAN prepared by: November 2012 bay vista Bremerton Housing AutHority Bay Vista suB-a rea Plan Amendment produced By BCra September 18, 2012 bay vista TABLE OF CONTENTSi - introduction A. Site Location & History ............................................................................................................................................................. B. Sub-Area Plan Vision ................................................................................................................................................................. C. Organization of Sub-Area Plan .................................................................................................................................................. ii - BAy VistA suB-AreA pLAn A. Local Planning Framework ........................................................................................................................................................ B. Consistency of the Sub-Area Plan with Bremerton’s Comprehensive Plan .............................................................................. C. Public/Stakeholder Process ...................................................................................................................................................... D. SEPA/NEPA Environmental Review ........................................................................................................................................... E. Bay Vista Architectural Review Committee ............................................................................................................................... iii - BAy VistA suB-AreA pLAn A. Existing Site conditions ............................................................................................................................................................. B. Sub-Area Plan Vision, Goals and Objectives ............................................................................................................................. C. Sub-Area Plan Elements ............................................................................................................................................................ D. Future Changes to the Sub Area Plan ....................................................................................................................................... iV - Zoning & deVeLopment reguLAtions A. Land Use Zones ......................................................................................................................................................................... B. General Development Standards .............................................................................................................................................. C. Streets, Sidewalks And Driveways ............................................................................................................................................ D. Low Impact Development ......................................................................................................................................................... E. Parking Standards ..................................................................................................................................................................... F. Landscape Standards ................................................................................................................................................................ G. Utility Equipment & Storage ..................................................................................................................................................... H. Walls, Hedges And Fences ........................................................................................................................................................ I. Exterior Lighting ........................................................................................................................................................................ J. Sign Standards .......................................................................................................................................................................... K. Glossary .................................................................................................................................................................................... L. Intent ........................................................................................................................................................................................ 1 1 1 2 4 4 5 8 12 12 13 13 15 17 20 21 21 28 29 31 31 34 44 44 45 45 50 52 bay vista 1 section I : INTRODUCTIONa. site loCation & History The 83-acre Bay Vista (formerly Westpark) site is located in West Bremerton, bounded by Kitsap Way on the north, Oyster Bay Avenue on the east, and State Route 3 on the west. The existing Westpark public housing community was built in 1941 and is owned and operated by the Bremerton Housing Authority (BHA). The community is the remnant of a larger World War II – era housing project that was built as temporary housing for shipyard workers. The site currently contains 631 residential units, primarily one-story duplex and four-plex in design, and a 60-unit apartment building for elderly and disabled residents. Ninety percent or more of existing units are for low-income families and individuals. The site also provides community functions (a community center, senior center, teen center, and head start facility) and some local services (laundry, storage facilities, maintenance shop, and administrative offices. A new 72-unit assisted living facility (Bay Vista Commons) was constructed and opened in December of 2007. The surrounding neighborhood contains a mix of residential, commercial and industrial land uses, including auto-oriented and larger retail uses along Kitsap Way. Kitsap Way in this area serves as a “gateway” to the City of Bremerton, though it is currently lacking in definition. B. suB-area Plan Vision The Westpark Sub-Area Plan was originally adopted in 2007. The Bremerton Housing Authority (BHA) voted to change the name of the site and master plan to Bay Vista in 2008. Consequently, the name of the Sub-Area Plan has also been changed to Bay Vista as part of the 2009 amendment to this plan. The vision and Sub-Area Plan for Bay Vista, including the 2009 amendments, was created in consultation with stakeholders, residents and neighbors. It used an intensive design charrette process and numerous community meetings, which are summarized in Section II. Development of the Sub-Area Plan also used environmental analysis, including preparation of a SEPA/NEPA environmental impact statement (EIS), and two EIS addenda, to inform master planning of the site consistent with environmental constraints and opportunities. The Sub-Area Plan concept is built upon six major goals: 1. Promoting a mixed-use, mixed-income traditional neighborhood. 2. Creating a pedestrian-oriented environment. 3. Maintaining/enhancing view corridors and landscaping. 4. Enhancing the civic realm and creating more usable public open space. 5. Promoting economic development through provision of commercial activities and services on-site and in the adjacent Neighborhood Center. 6. Integrating low impact development (LID) approaches into the Master Plan. The new Bay Vista is envisioned as an urban mixed-use, mixed-income, pedestrian-oriented community. It will be characterized by a variety of types and styles of housing to meet the needs of a range of income groups. Accommodating these groups will help to de-concentrate low-income housing in Bremerton. Retail and commercial uses will provide for some of the everyday shopping needs of residents, as well as provide job opportunities for residents. The retail center will provide financial support i - introduction 2 section I : INTRODUCTIONNovember 2012 for implementation of the master plan, including construction of new infrastructure. Bay Vista's on-site population will also provide support for additional commercial activity in the future Oyster Bay Neighborhood Center. The site will be sensitively designed to maintain significant open space and existing trees, to preserve and enhance views, and to carefully manage stormwater and other natural features. New parks, civic spaces and outdoor amenities will be created. Proposed development standards and Design Standards, and covenants, conditions and restrictions (CC&Rs), will establish high standards for the quality of redevelopment, yet provide flexibility to respond to market changes and opportunities. The plan will provide high quality infrastructure and services to residents. The Bay Vista site will relate to the surrounding neighborhood in terms of activities and scale, and provide a catalyst and model for future redevelopment. C. organization of suB-area Plan The Sub-Area Plan is organized in four major sections. Following this introduction, Section II describes the major objectives of the Plan, and its planning regulatory context within which it has been created. Section II also delineates the public/stakeholder process and SEPA/NEPA compliance for the plan are also described. Section III describes existing site conditions, and the vision, goals and objectives for redevelopment of Bay Vista. The major elements of the Sub-Area Plan–land use, housing, parks and open space, roads and infrastructure–are described in narrative and graphics. This section has been adopted by the City as an element of the Bremerton Comprehensive Plan. Section IV contains the zoning and development standards that will apply to Bay Vista, including regulations for uses, density, building heights, setbacks and similar components of development. bay vista 3 section I : INTRODUCTIONVICINITY MAP 4 November 2012Section II : purpose, process & consistencyThe Bay Vista Sub-Area Plan is intended to provide a road map for future redevelopment of the site. It articulates the vision, goals and objectives for redevelopment of Bay Vista, and embodies the policies of the City of Bremerton Comprehensive Plan, which it supplements. The Plan also establishes zoning standards which will guide the preparation of future site development plans, subdivisions and building permits by applicants; installation of infrastructure by the Bremerton Housing Authority (BHA) and individual developers; and review of these plans by the City of Bremerton (City) and the Bay Vista Architectural Review Committee (ARC). The Sub-Area Plan reflects the Redevelopment Master Plan for Bay Vista prepared by the Bremerton Housing Authority. It is also responsive to environmental impacts identified in Bay Vista environmental documents, to financial constraints, and to changing market conditions. The Westpark Sub-Area Plan was initially adopted in 2007. Following additional community involvement, public hearings and environmental review, amendments were proposed to reflect the BHA's ongoing planning, as well as updated information about site constraints and market conditions. In fall 2008, the BHA received a HOPE VI grant from the U.S. Department of Housing and Urban Development. Conditions of the grant include a maximum 54-month schedule for completion of construction. The Sub-Area Plan was amended by the City Council in 2009 to reflect this constraint and other changed conditions noted previously. a. loC al Planning framework OVERVIEW The Bay Vista site has been the subject of several City legislative actions over the past few years and was also addressed specifically in the City’s recent adoption of its updated Comprehensive Plan and zoning code in 2004. These actions have provided a framework for planning redevelopment of the site. In September 2003, the City amended its Community Renewal Plan, pursuant to the state Community Renewal Law (RCW 35.81), to incorporate the site as a “blighted” area for purposes of community renewal efforts (Ordinance No. 4830 and 4870). The designation was supported by findings that the site was isolated from adjacent areas that building size and design were deficient, and that physical deterioration was a contributing factor to disinvestment in the area. These actions also reaffirmed the City’s intent to cooperate and assist the Bremerton Housing Authority in the redevelopment of the site, (pursuant to RCW 35.83), and to provide a framework for redevelopment in the Comprehensive Plan and zoning regulations. This framework is described below. PUBLIC SECtOR REDEVELOPMENt SItE (PSRS) The Comprehensive Plan Land Use Map designates Westpark (now Bay Vista) as a Public Sector Redevelopment Site (PSRS). These are special, large-scale sites with high potential for development that is innovative or that meets a unique community need. They should be developed consistent with specific district planning efforts that address the site, compatibility with surrounding uses, and consistency with the Comprehensive Plan. A PSRS must have a clearly defined community benefit, such as meeting a public housing need. They may include mixed type residential development with an open space component and secondary commercial or office development. ii - BAy VistA suB-AreA pLAn purpose, process, and consistency with the comprehensive plan bay vista 5 Section II : purpose, process & consistencyOyStER BAy NEIGHBORHOOD CENtER The Comprehensive Plan designates a future Neighborhood Center for the Oyster Bay Area adjacent to the Bay Vista site, located on both sides of Kitsap Way. This 37-acre center is projected to redevelop over time in conjunction with, but slower than, Bay Vista, and to transition into an urban, pedestrian-friendly area connected with the surrounding area by trails, open space, and access to the shoreline. The Center will include a core, with mixed-use (residential and commercial) buildings. The Center will receive economic support from the surrounding neighborhood, including Bay Vista’s residents and workers; land uses in Bay Vista are expected to complement redevelopment of Oyster Bay. A Sub-Area Plan will be prepared for the Oyster Bay Center; however, the timing of this planning effort is uncertain. SPECIFIC AREA PLANS The Comprehensive Plan anticipates that more detailed area-specific plans will be developed to implement Public Sector Redevelopment Sites, such as Bay Vista. Key aspects of these plans include: a process that involves the community, consistency with the Comprehensive Plan goals and policies, and inclusion of development standards and design standards. The Bay Vista Sub-Area Plan is such a specific area plan and has been developed to meet these requirements. The relationship to the Comprehensive Plan goals is discussed below. Revision of the Bay Vista Sub-Area Plan follows the City's established process for amending the Comprehensive Plan. This process includes public involvement, environmental review, and public hearings by the Planning Commission and City Council. In cooperation with the City, the BHA sponsored eight community meetings and workshops in the fall of 2008 to gain input on proposed changes to the Sub-Area Plan. An addendum to the Westpark EIS was also prepared to address the proposed changes. The revisions were adopted following public hearings by the Planning Commission and the City Council. B. ConsistenCy of tHe suB- area Plan witH Bremerton’s ComPreHensiVe Plan BREMERtON COMPREHENSIVE PLAN - CENtERS CONCEPt The city’s updated Comprehensive Plan is based on a “Centers” concept, in which a significant portion of the City’s future growth will be guided to numerous Centers designated throughout the City. Centers vary in scale, function and character, and each is intended to be a distinct district or “village” with a unique character. Designated centers range from the City Center, which provides a wide range of activities that serve the entire City and the region, to smaller neighborhood centers, which provide goods and services, and amenities to residents within a neighborhood. In general, centers are intended to be mixed-use, pedestrian-friendly, well-designed areas with open space, public gathering places, access to transit, and adequate infrastructure. SHAPING BREMERtON tHEMES 1. Distinctive Growth, with Viable Neighborhoods and Centers that Provide Greater Choice and Convenience. Redevelopment of Bay Vista will help to revitalize an existing neighborhood that is characterized by outdated, deteriorated housing and infrastructure, and has been designated as “blighted.” The new Bay Vista neighborhood will be characterized by mixed-use development, a wide range of housing options affordable to a mix of income groups, ample open space and amenities, pedestrian accessibility, quality design, improved infrastructure and enhanced environmental resources. Everyday goods and services, and local employment opportunities, will be provided on-site. 2. Enticing New Development, with a Focus on the Downtown Regional Center. The Bremerton Housing Authority has been working closely with the City and the broader community to shape a plan for Bay Vista that fits the site and is responsive to the City’s requirements and needs, including economic development, housing 6 November 2012Section II : purpose, process & consistencyopportunities and population support for the future Oyster Bay Neighborhood Center. The City’s updated Comprehensive Plan and development regulations provide guidance and flexibility for large public parcel development proposals like Bay Vista. 3. Supportive transportation, with Seamless, Efficient and Varied Choices. Regional transportation facilities bounding the Bay Vista site include State Route (SR) 3, Kitsap Way and Oyster Bay Avenue. Access to the site is provided by Oyster Bay Avenue, Sinclair Drive, Arsenal Way and Sand Dollar Drive. Kitsap Transit provides public transit service to the City of Bremerton. Routes No. 24 and 26 serve the Bay Vista site, with stops along Kitsap Way (Route 24) and at the Firs Apartments on Oyster Bay Avenue (Route 26). Kitsap Way has a designated bicycle lane, wide shoulders, raised sidewalks on both sides, and painted crosswalks with pedestrian call buttons. The City of Bremerton has recently upgraded or added new accessible ramps at various intersections along Kitsap Way. A mid-block pedestrian crossing is located east of Oyster Bay Avenue. Oyster Bay Avenue includes raised sidewalks on one side of the street. Levels of service at major intersections will meet City of Bremerton standards. 4. Improved Accessibility, especially for the Pedestrian. The Bay Vista site is being planned to support multiple transportation modes, including vehicles (through adequate access and parking); transit (through higher urban densities and access to the regional road system); and pedestrians (by integrating trails and pedestrian amenities in a mixed-use development pattern). 5. Quality Housing, with Broader Choices. Existing housing on the site is old and deficient; the Comprehensive Plan and several City ordinances have identified the site’s housing as substandard and in need of revitalization. The redeveloped Bay Vista will provide approximately 875 housing units in a variety of types and styles, including single-family attached and detached (duplexes, townhouses, clustered cottages) and apartments. Units will be for-sale and for-rent, market-rate apartments and public housing. All existing public housing units will be replaced either on-site (190 units) or off-site, which will be consistent with the City’s desire to disperse public housing. 6. Business Support, with Increased Opportunity. Bay Vista will provide local jobs and goods and services for residents of Bay Vista and the surrounding neighborhood. Bay Vista’s residents will also provide market support for existing and new commercial development in the Oyster Bay Neighborhood Center. 7. Environmental Management, Integrating Natural Systems. The plans for Bay Vista include approximately 15 acres of parks and open space, and retain the existing preserve park; with the exception of this preserve, most of the site and existing vegetation will be disturbed or removed in conjunction with site grading and construction. When complete, Bay Vista will exhibit ample landscaping and open space. This open space and vegetation will provide habitat for species of urban wildlife, as well as recreational opportunities for local residents. Environmentally critical areas located on and adjacent to the site (such as wetlands) will be protected consistent with City regulations. Stormwater will be controlled and treated consistent with City requirements. 8. Community Service, Focusing on Assets Bay Vista will install new infrastructure on the site; facilities will be provided concurrent with development. The Bay Vista EIS documents evaluated the service demands of the new population to help ensure that any adverse impacts were identified and addressed. 9. Design Review: Advancing Quality Urban Development. The Bay Vista Sub-Area plan includes development standards that will apply to all future development on the site. These standards, and City review of future applications, will ensure that future development is of high quality and meets expectations. The BHA has developed Covenants, Conditions and Restrictions (CC&Rs) that apply detailed design requirements to land and buildings throughout the site. bay vista 7 Section II : purpose, process & consistencyCOMMUNIty CHARACtER GOALS CC1 ..Demonstrate excellent urban design qualities in new development. Redevelopment of the site will replace old, substandard housing with modern dwelling units, mixed-use buildings and a village retail center. The Sub-Area Plan contains design standards that are intended to set high standard for site and building design. CC2 ..Assure that new development relates to surrounding uses and provides for urban livability. The Bay Vista site is being master planned and will provide compatibility between land uses through careful siting, use of open space and buffering, and transitions between uses of different intensity. Bay Vista will function as a traditional community, with a mix of activities that meet the needs of daily life, connected by streets and trails, and enhanced open space, urban amenities and high quality design. The Master Plan also considers land use and scale relationships to the surrounding community, including the future Oyster Bay Neighborhood Center. CC3 ..Provide for a safe, pleasant and rich pedestrian experience. Bay Vista will contain approximately 30,000 linear feet of pedestrian walkways and trails. Streets are designed to accommodate pedestrians and to make walking safe, pleasant and convenient. Pedestrian amenities include landscaping, benches, open space, pocket parks and lighting. CC4 ..Promote the development of areas of special character, encouraging a diversity of communities within the city. Bay Vista is a large site that presents unique redevelopment opportunities. Its history and status as a 1940s-era public housing project with aging and substandard facilities sets the stage for its transformation into a modern, well-designed urban mixed-use community located at a major entrance to the City. LAND USE GOALS LU1 ..Identify and enhance distinctive neighborhoods, communities and centers throughout the City. As noted above, Bay Vista will be transformed into a modern, well-designed urban mixed-use community. It will be distinct in appearance and character in the City’s existing fabric. It will also provide long-term population support for future development of the Oyster Bay Neighborhood Center. LU2 ..Integrate an open space system into the land use pattern that increases the amount of open space, protects. Bremerton’s natural resources, and provides a source of beauty and enjoyment for all residents. The Bay Vista plan includes approximately 15 acres of parks and open space that is integrated into the land use pattern. Significant trees will be retained to the greatest extent feasible or replaced. The open space plan includes areas for active recreation – including ball-fields, pocket parks, tot lots and gathering places – and for gathering and passive enjoyment. A management plan will be prepared and implemented for the Preserve, a large natural area. Residents will be involved in overseeing preservation of this area. LU4 ..Provide for walkability throughout Centers and neighborhoods. Bay Vista is intended to be a walkable community, and has integrated the needs of the pedestrian into its land use pattern and transportation system. The plan includes approximately 30,000 linear feet of pedestrian paths and trails, connecting areas of the site with one another and with the surrounding neighborhood. LU5 ..Designate neighborhood, district, and employment Centers on the Land Use Map that provide mixed-use environments which serve as the primary focus for growth. The Comprehensive Plan anticipates that retail and service uses will be provided in Bay Vista as well as in the future Oyster Bay Neighborhood Center. Bay Vista will provide a residential population that will support commercial uses planned on-site and in the Neighborhood Center. LU7 ..In order to encourage new development to occur in locations and patterns consistent with the Vision(s), Goals and Policies of this Plan – specifically in Centers – remove or revise existing land use designations that would sit multi-family uses in locations that do not support the Centers Concept. 8 November 2012Section II : purpose, process & consistencyBay Vista includes a mix of multi-family and single-family housing. The proposed location of multi- family housing adjacent to Kitsap Way will support commercial activities anticipated on-site and in the Oyster Bay Neighborhood Center. LU11 Provide for the viability of communities, neighborhoods, and Centers through strategic land use designations and infrastructure provisions. The Comprehensive Plan Land Use Map designates Westpark (now Bay Vista) as a Public Sector Redevelopment Site (PSRS). This designation recognizes its public ownership and the public interest in innovative redevelopment that meets community needs. The master plan has been developed through a Sub-Area Planning process, will be compatible with adjacent uses, and will provide a variety of housing types and ownership options that will meet a variety of housing needs. LU12 Support community-wide access to amenities and services. Bay Vista will provide open space and recreational amenities that are available to all community residents. The site has also been planned to maintain and enhance views of the water. LU17 Adopt and implement appropriate standards and regulations for stormwater management. the City of Bremerton should adopt and implement regional plans, strategies, and standards as appropriate, including but not limited to the Seattle/King County Storm Water Manual, FEMA maps, and the Puget Sound Action team’s 2000 Water Quality Plan. Stormwater will be managed in a manner consistent with city standards. C. PuBliC/stakeHolder ProCess The Bay Vista Sub Area Plan reflects the efforts of many people, including: city leaders and staff, the many citizens and Bay Vista residents who turned out for an initial program of public community meetings and a week-long design charrette, urban designers, architects, traffic planners, civil engineers, environmental specialists, and market consultants, to name a few. A second round of meetings and forums were held to discuss revisions to the Sub-Area Plan based on updated information about the site and market conditions. Community meetings were advertised through a combination of mailed and published notices, posted signs, and newsletters. Bay Vista residents, neighbors within 300 feet, and the community at large were invited to participate in the process. All residents of Bay Vista and within 300 feet of the site received written notices and invitations The public process conducted for the initial adoption of the Sub Area Plan included the following outreach efforts and comment opportunities: Four public community meetings: • March 16, 2006• May 12, 2006• June 22, 2006 (EIS scoping included) • September 14, 2006 A week-long design charrette: • May 8-12, 2006 two stakeholder’s meetings: • April 19, 2006 • July 13, 2006 SEPA/NEPA scoping meetings and EIS meetings: • June 22, 2006 Bremerton Planning Commission workshops and public hearings: • October 17, 2006 • November 21, 2006 Bremerton City Council public hearings and meetings: • January 24, 2007• February 7, 2007 bay vista 9 Section II : purpose, process & consistency At each of the meetings, the current status of the design process was presented, and attendees were invited to comment on the design, and to ask questions about the project and the process. The goal of the stakeholder process was to create a vibrant neighborhood that reflects multiple public objectives, with the participation and support of the community as a whole. The content of the public meetings were as follows: Community Meeting #1: March 16, 2006 West Hills Elementary School Gymnasium This meeting included presentation of the existing conditions on the Bay Vista site, along with the proposed process for redeveloping the site. Goals and possibilities for the site were presented, and an invitation for the public to participate in the process of creating the Sub-Area Plan document. The timeline and process for the project were presented, and a question and answer session followed. Questions from attendees, mostly existing Westpark residents, were focused on the relocation plan, demolition, and future rent levels for the replaced subsidized housing. Stakeholder’s Meeting #1: April 19, 2006 Westpark Community Center This meeting included presentation of the existing conditions on the Westpark site, along with the proposed process for redeveloping the site specifically geared toward those neighboring businesses and agencies affected by the Westpark redevelopment. Retail and commercial components of the project were presented, with a discussion of potential impact to surrounding businesses. The timeline, process and current status of the project were also presented, with a question and answer session following. Questions from the stakeholders included the following topics: project financing; whether land will be sold as a large block or in individual lots; the anticipated income of future residents; use of design standards; ability to rent units, housing for residents not returning to Westpark; and the type of retail development that will face Oyster Bay Avenue. Community Meeting #2 (Design Charrette): May 8-12, 2006 – Westpark Community Center At the Design Charrette, the public had the opportunity to interact directly with the design team over the course of a week while the design was in process, allowing true public input. Each night (with the exception of Thursday) during the charrette there was a presentation and question and answer session, outlining the day’s progress. On the final evening, all of the drawings were presented, including the preferred site plan, which was generated through input from each of the agencies and stakeholders involved, along with the many members of the local community that participated. This final presentation served as the “official” public meeting component of the charrette, and was followed by a question and answer session. Questions raised at the meeting addressed the following topics: replacement of existing streets; density of housing; noise; availability of units for the disabled; phasing of construction; grading of the site; storm water management; sale of lots to individuals. Community Meeting #3: June 22, 2006 Westpark Community Center This meeting included presentation of the EIS process, along with the proposed process for the environmental approval process. A question-and-answer session specific to the EIS was held, followed by an update of the overall design process for the site. There was an additional opportunity for questions and answers after the design process update. Questions and comments addressed the following topics: fill proposed for the existing ball field and potential seismic event; timing of construction; communication with residents about project progress; impacts on existing wildlife; questions about the 10 November 2012Section II : purpose, process & consistencyrelocation process; kinds of future businesses; lighting; water features; BHA ownership of housing; whether there will be multiple builders for the for-sale housing; and name of the new community. Stakeholder’s Meeting #2: July 13, 2006 Westpark Community Center This meeting was geared toward the stakeholders and included an update on the design process for redeveloping the site. Timelines for relocation of the current Westpark residents and construction were presented, with a question- and-answer session following. Questions from the stakeholders included the status of the grading design; and status of the stormwater system. An additional series of informational meetings and forums was held in September-October 2008 in connection with proposed revisions to the Sub-Area Plan. Community Meeting #1: September 25, 2008 – Westpark Community Center The kick-off meeting included a summary of the plan revision process, the topics and schedule of subsequent community meetings, and major changes being considered to the sub-area plan/master plan. The recently awarded HOPE VI grant was also described. As summarized, the basic concepts of the master plan for the community, recently renamed Bay Vista, would remain the same: a mixed-use, mixed-income, pedestrian oriented community, with ample open space and landscaping, modern infrastructure and high quality design. Proposed changes to the master plan are motivated primarily by changing real estate market conditions, and project financing needs. Major changes to the master plan being discussed include the following: • a slight increase in the number of housing units, but the same number of low income units dispersed throughout the community; • an expansion and intensification of the retail center, potentially incorporating the existing fire station site; • demolition of the existing community center and development of a smaller community center on a corner of the ball field; • the same amount of parks and open space; • noise mitigation walls adjacent to SR 3; and • investigation of additional low impact design techniques for stormwater management. Based on conditions of the HOPE VI grant, construction will need to be completed by 2013 (54 month maximum from grant award). A question and answer session followed the presentation. Questions addressed the following topics: location of a new fire station; whether the fire station site be used as a maintenance facility rather than for commercial use; how secure the HOPE VI grant funds are in view of recent national economic events; what the HOPE VI funds can be used for; whether there will be a homeownership program; whether off-site property will be condemned by the City; the new phasing program; tree preservation; the design and character of the new commercial center; and numerous questions related to the on-going tenant relocation program. Community Meeting #2: October 2, 2008 – Westpark Community Center The second meeting of the series focused on the changes to the commercial piece of the redevelopment known as Sector 5. Mel Maertz from Olympic Associates made a power point presentation which showed the conceptual sketches of what the new commercial could look like. Slides also showed possible elevations for a grocery, an inn and residential. Two community members and a potential commercial tenant attended this meeting. Community Meeting #3: October 9. 2008 – Westpark Community Center The third meeting was a discussion of the civil engineering changes. The outline for this meeting was: 1. Introduction a. Why are we going through this process bay vista 11 Section II : purpose, process & consistency2. Site Overview/Changes a. Changes in roadway layout/alleys b. Changes in open space c. Changes in Stormwater Management Areas 3. Grading a. Site constraints b. Overall idea/slope reduction c. Majors areas of cut and fill 4. Stormwater Management a. Drainage Basins b. Outfall c. Conveyance systems 5. Low Impact Development a. Pervious Pavement b. Conveyance Swales c. Roof Downspouts d. Filterra 6. Street Sections a. Possible Options 7. Closing a. Next Steps Justin Goroch from BCRA Engineering was the featured speaker. Questions were fielded from the audience with most of the questions centering on our use of Low Impact Development. Community Meeting #4: October 16, 2008 – Westpark Community Center The fourth meeting was a presentation of what the new replacement housing in the new Bay Vista will look like. Presentations were made by Tonkin Hoyne complete with a power point presentation of what the replacement public housing would look like and Ross Deckman + Associates with schematics of what the multifamily apartment and manor houses would look like. The tenants in the audience asked questions such as what amenities would the units have. Responses comparing and contrasting the current housing with the new housing were well received. Community Meeting #5: October 23, 2008 – Westpark Community Center The following agenda was used for this meeting: Guest Introduction: Greg Brower; Landscape Architect of Berger Partnership Mel Maertz; Architect of Olympic Associates Company Sub- Area Plan: Landscaping & Site Amenities A. Streetscape B. Parks C. Open Space D. Club House E. Residential Landscape The presenters showed visuals of what the new parks and open spaces would look like. They also showed a schematic design of a new community club house. Audience comments were primarily about the use of existing trees and new plantings. Community Meeting #6: October 30, 2008 – Westpark Community Center This final meeting was a wrap up and summary of the previous 5 meetings. We reviewed the contents of the previous weeks’ presentations and fielded any audience questions that may have come up over the course of the 6 weeks. No issues were left outstanding and no official comments have been received. More detailed documentation of the public process is on file with the City of Bremerton. Stakeholder Meeting: June 21, 2012 – Summit at Bay Vista Tenants and community partners were present to review the proposed changes to the Sub Area Plan. Responses were all supportive of the plan. Stakeholder Meeting: June 25, 2012 – BHA Administrative Offices BHA staff was present to provide an overview of proposed changes to the Sub Area Plan. There were no other attendees at the meeting. 12 November 2012Section II : purpose, process & consistencyd. sePa/nePa enVironmental reView The review process for the proposed re-development of Westpark, and the initial adoption of the Sub-Area Plan, included preparation of an Environmental Impact Statement (EIS) to comply with the National Environmental Policy Act (NEPA) and the State Environmental Policy Act (SEPA). The City also prepared an EIS Addendum for the initial adoption of the Sub-Area Plan. The purpose of an EIS is to present information about the environmental consequences of proposals, including redevelopment projects, to consider alternative courses of action, and to mitigate environmental impacts that are avoidable. This analysis helps ensure that decision makers are aware of impacts to the natural and human environments, and that they consider opportunities to mitigate impacts. The process also provides opportunities for interested agencies, tribes and citizens to comment on proposals and to be involved in their consideration. A single EIS was prepared to satisfy NEPA and SEPA requirements. The City of Bremerton, designated as the Responsible Entity (RE) for NEPA compliance, served as the NEPA lead agency. Compliance with NEPA was required because the project involved federal action, by the Department of Housing and Urban Development (HUD), to use federal funds in redeveloping the site. The Bremerton Housing Authority acted as the lead agency for SEPA compliance. Scoping occurred in June 2006. A Draft SEPA/NEPA EIS was published in March 2007. Public meetings on the Draft EIS were held in April 2007. A Final EIS, responding to public and agency comment, was published in May 2007. All meetings were advertised consistent with state and federal requirements. Notices of the publication of EIS documents were similarly published consistent with SEPA and NEPA requirements. An Environmental Review Record (ERR) was prepared to comply with NEPA and is on file with the City of Bremerton. An addendum to the EIS was prepared in 2008 to address changes to the Sub-Area Plan. e. Bay Vista arCHiteCtural reView Committee All new development proposals will adhere to the development review, permitting and design approval processes of the City of Bremerton and the Bay Vista Architectural Review Committee (ARC). ARC planning and design standards are identified in the Sub-Area Plan. Covenants, Conditions & Restrictions (CC&R’s) will also apply to all property on the site that is sold for redevelopment, to help ensure that all proposals meet relevant requirements. The Bremerton Housing Authority has contracted with a development consultant who is responsible for all development within the boundaries of the project site. The development consultant will assemble an ARC responsible for the review and approval of all permit applications prior to their submittal to the City of Bremerton. Upon approval the ARC will issue a certificate that will be required to be included with the submittal to the City. Permit applications will not be accepted by the City without the approval of the ARC. The City will maintain its primary authority to review and approve plans for consistency with zoning and development standards, and building requirements, as required by law. In particular, the Architectural Review Committee will ensure that proposed development is consistent with the intent and specifics of CC&R’s adopted for the Bay Vista site. bay vista 13 section III : Sub-Area planiii - BAy VistA suB-AreA pLAn a. existing site Conditions DRAINAGE Stormwater within the site is conveyed by overland flow and through a rudimentary system of open ditches and enclosed drainage pipes. Outside of the project area, stormwater is conveyed away from the site in open ditches and enclosed drainage systems. Stormwater from the on-site area combines with stormwater from off-site areas in the conveyance systems outside of the project area. There are no known sources of off-site stormwater that is routed through the existing drainage system. There are no known existing water quality treatment facilities within the Bay Vista site. Stormwater treatment for the redeveloped conditions on the overall site will be provided in accordance with Title 15.04.042 of the City’s municipal code. Water quality treatment and flow control facilities will be designed in accordance with the City of Bremerton Public Works and Utilities Standards, using Department of Ecology (Ecology) hydrologic simulation software to calculate flow rates and volumes Currently, most of the site discharges through two existing outfalls into Oyster Bay. Small portions in the Southeast and Northwest corners of the site discharge to existing Washington State Department of Transportation storm drainage systems ultimately flowing to the Sinclair Inlet and Ostrich Bay Creek. Low Impact Development (LID) techniques, including, but not limited to, pervious pavement, raingardens, bioswales, and roof drain dispersion will be utilized to the greatest extent feasible to treat stormwater and help control flows from the site. tRANSPORtAtION Regional transportation facilities bounding the Bay Vista site include SR 3, Kitsap Way and Oyster Bay Avenue. SR 3 is a four-lane, north-south freeway serving Central Kitsap County. Kitsap Way is a five-to-seven lane, limited access, principal arterial that connects West Bremerton to Central Kitsap County (via SR 3). SR 3 and Kitsap Way intersect just northwest of the Bay Vista site. Access to the site is provided by Oyster Bay Avenue, Sinclair Drive, Arsenal Way and Sand Dollar Drive. Kitsap Transit provides public transit service to the City of Bremerton. Routes No. 24 and 26 serve the Bay Vista site, with stops along Kitsap Way (Route 24), at the Firs Apartments on Russell Road (Route 26) and within the Bay Vista site. Service on both routes has one-hour headways. Kitsap Way has a designated bicycle lane, wide shoulders, raised sidewalks on both sides, and painted crosswalks with pedestrian call buttons. The City of Bremerton has recently upgraded or added new accessible ramps at various intersections along Kitsap Way. A mid-block pedestrian crossing is located east of Oyster Bay Avenue. Oyster Bay Avenue includes raised sidewalks on one side of the street. Two intersections of Kitsap Way – at Oyster Bay Avenue and Pershing Avenue – have relatively high accident rates (based on the last three-year average) Existing levels of service at major intersections meet City of Bremerton standards. Those experiencing the highest delays are Kitsap Way at Marine Drive, and Kitsap Way at the SR 3 southbound ramps. CRItICAL AREAS The Bay Vista site does not contain wetlands or streams, based on preliminary analysis. These resources are presently adjacent to the site, however, and on-site activities (e.g., stormwater runoff) will need to be managed to protect off-site water quality and habitat. The site’s trees and vegetation provide a valuable environmental and visual amenity, but do not provide habitat for designated threatened, endangered or sensitive species. Critical aquifer recharge areas are not present. Some steep slopes do occur and will be addressed through site planning consistent with City requirements. 14 November 2012section III : Sub-Area planSUMMARy OF OPPORtUNItIES AND CONStRAINtS Based on natural features, site location and expressed public and private planning objectives, the Bay Vista site possesses significant opportunities for redevelopment. There are also a number of constraints that will be addressed through the sub-area planning and master planning processes. • The site’s topography is varied and dramatic. Three high points within the site will most likely create beautiful views towards Oyster Bay. • Bay Vista is bounded by State Road 3 and Kitsap Way. These two primary roads carry high volumes of traffic, which creates a perceptible level of noise within the site. • A five-minute walking distance (quarter-mile radius) is often used as a benchmark for planning traditional neighborhoods. Most of the site, and portions of the planned Oyster Bay Neighborhood Center commercial area (along Kitsap Way), are within convenient walking distance and are accessible from the surrounding community. Bay Vista residents will provide economic support for on-site and off-site services. • The site is not significantly constrained by critical areas (e.g., wetlands, streams, fish and wildlife habitat, aquifer recharge areas). It does contain some steep slope areas that will need to be stabilized and carefully engineered. Figure 2 – Opportunities and Constraints Diagram bay vista 15 section III : Sub-Area plan• Some mature landscaping and significant trees are present on the site in the Preserve. These features are valuable amenities and provide opportunities for integration into a system of parks and open space. B. suB-area Plan Vision, goals and oBjeCtiVes The vision of the Bay Vista Sub-Area Plan is to provide a modern, mixed-use, mixed-income, pedestrian- friendly and amenity-rich neighborhood for residents, neighbors and visitors. Redevelopment will create a particular kind of place, one that provides space for the community to gather and interact. Streets, plazas and other public spaces will all be designed with the care and attention to detail required to make them function as outdoor public “living rooms” of the new Bay Vista. The pedestrian-oriented design is reflected in a clearly defined “main street”, small-scaled blocks, and pedestrian-scale buildings on landscaped streets. Public art parks, and stands of significant trees also contribute to this definition. The Sub-Area Plan’s overall goals and objectives include the following: 1. Promote a Mixed-use, Mixed-income Neighborhood • Promote a livable, walkable community through traditional neighborhood-making principles • Provide a varied set of housing and lot types to promote a mixed-income neighborhood • Encourage development of new neighborhood retail along Arsenal Way and at the intersection of Kitsap Way and Oyster Bay Avenue • Connect to and re-use existing infrastructure where appropriate 2. Create a Pedestrian-oriented Environment • Conceal retail parking to enhance the public realm for pedestrians along the street • Improve pedestrian and bicycle connections within and outside of the Bay Vista site • Encourage the use of public transit • Provide and enhance trails through existing wooded and landscaped areas 3. Maintain and enhance existing view landscape and corridors • Take advantage of views north to Oyster Bay • Maintain and enhance trees and landscape along the south side of Kitsap Way and in the Preserve • Develop public neighborhood parks and greens adjacent to existing landscape features and views 16 November 2012section III : Sub-Area plan4. Enhance the civic realm and create more usable public open spaces. • Provide outdoor amenities • Create smaller pocket parks throughout the neighborhood to promote walkability and security • Improve and create parks and civic spaces 5. Promote economic development through provision of commercial activities and services. • Develop a Village Center that will provide local jobs, help finance redevelopment of the site, and generate revenue to the City. • Provide a full range of services to meet the everyday needs of local residents. 6. Integrate low impact development approaches into the site master plan where possible and practical. • Reduce street widths where appropriate to help reduce impervious surfaces • Maintain and integrate open space into the site plan • Investigate stormwater design that uses bioswales and infiltrates stormwater where appropriate • Use pervious asphalt where soil conditions permit OPEN SPACE GOALS • Create parks that enhance the community and encourage and support social interaction. • Create open spaces easily accessible to residents. • Create parks that appeal to a wide range of age groups. A diversity of park types should be established to offer a diversity of passive and active uses. • Use the ‘eyes-on-the-park’ to create safe active environments. Lighting, layout and visibility are key factors in the design of active parks. Provide trash and recycling bins for the parks that meet the needs of the users. • Use resilient materials that reduce maintenance costs. • Increase community participation through direct access for residents from their homes to adjacent parks. • Create public viewing areas. • Provide for an urban trail through the natural area and along Kitsap Way. • Provide for wildlife through preservation and enhancement of the natural area. Bay Vista’s landscape will also serve to enhance the site’s architecture and relate to the local environment. The topography of the site allows for varied relationships of architecture and landscape, which will help distinguish sub-neighborhoods from each other. Open and accessible outdoor spaces and convenient seating will encourage human interaction and create a safe and visible environment for children. Pedestrian bay vista 17 section III : Sub-Area planscale lighting will enhance the streetscape, alleys and parks. Narrower streets will calm traffic and protect pedestrians. C. suB-area Plan elements The Bay Vista Sub-Area Plan addresses the following elements: 1. Land Use, including the master site plan map and identification of major land uses. 2. Housing, including the expected number of for-sale, rental, market-rate and low-income units; and planned densities. 3 Open Space, landscaping and amenities. 4. Roads and Infrastructure, including vehicular and non-vehicular circulation systems, storm water management, and site utilities. Bay Vista will be a mixed-use, mixed-income community drawing on the best of traditional neighborhood design and the rich history of Bremerton, while employing modern amenities and taking advantage of the topography, landscape and views. The intent is to build a warm community, where neighbors interact and walk on beautiful tree-lined residential streets, and where pedestrian circulation is emphasized. The areas of the site where retail is proposed will be designed to be lively and energized. The Land Use Plan is loosely based upon a grid of interconnected streets that provide multiple routes to any destination. This configuration allows easy pedestrian and vehicular circulation throughout the neighborhood by spreading out traffic loads. Sidewalks, street trees, and appropriately scaled street lights and furniture will provide richly detailed streetscapes. A unique sense of place will be created through the arrangement of vibrant public spaces, a clear hierarchy of pedestrian-friendly streets, a balanced program of residences, retail services, offices, community buildings and spaces, as well as an architecture that responds to the northwest vernacular. Buildings that line public spaces will enclose and frame the public realm, and connect to one another at the scale of the pedestrian. Foremost, Bay Vista will be a residential community, offering numerous types, styles and sizes of residential units types, at varying densities, to meet the community’s housing needs and to accommodate a spectrum of income groups. The heart and center of the community will be the Bay Vista Preserve, a large open space that will provide opportunities for active recreation and passive enjoyment of significant vegetation. Residential neighborhoods will line the park. Smaller parks and open spaces will be located throughout Bay Vista’s neighborhoods and plazas, and more “urban” spaces will be co-located. Different land uses will be arranged compatibly in distinct neighborhoods, and in mixed-use buildings, some of which will have plazas and other urban open spaces. The site’s more intensive land uses including larger high density residential buildings, and a retail/ commercial village – will be located along the site’s outer edges, closer to (but buffered from) major arterials. All of the site’s activities, however, will be within a convenient walk or bike ride via Bay Vista’s system of paths and trails. 1. LANd USE The general arrangement and location of land uses in Bay Vista are shown in Figure 4, which indicates the planned, general locations of proposed land uses. Mix of Land Uses The planned mix of land uses will create a vibrant, attractive and functional community. Residential uses including single-family attached and detached in a variety of designs, and multi-family will predominate. Retail and service uses will also be provided to meet the everyday needs of residents; these activities will support the more diverse, larger scale commercial activities occurring along Kitsap Way, in the designated Oyster Bay Neighborhood Center. Retail/commercial and residential may occur in mixed- use buildings. More intensive and larger-scale land uses (retail, commercial, and larger multi-family buildings) will generally be located closer to the site’s boundaries, transitioning to residential and open space uses in more central portions of the site. Density The allowable gross density based on preliminary 18 November 2012section III : Sub-Area planVILLAGE COMMERCIAL MULTI-FAMILY/ SENIOR HOUSING OPEN SPACE PARKS MULTI-FAMILY/MIXED USE LOW OR MEDIUM DENSITY RESIDENTIAL FIGURE 4 - LAND USE PLAN LEGEND Figure 4 – Land Use Plan bay vista 19 section III : Sub-Area planplat approval is approximately 12 dwelling units per acre. Individual projects must be within the range that is specified for the type of residential unit in the Sub-Area Plan’s development standards. Variations in density are anticipated throughout the site, subject to the limits in the development standards. 2. HOUSING Housing Program Bay Vista will include a mix of for-sale and rental units, and market-rate and public/low-income units. Low-income units will be developed at Bay Vista and will include a mix of residential housing types. 3. OPEN SPACE ANd PARkS Approximately 15 acres of the Bay Vista site will be devoted to various types of parks and open space. As shown on Figure 4, open space and parks will be distributed across the site. Together, they express Bay Vista’s environmental sensitivity, its desire to enrich the health of the community and the individual, and to establish the character of the neighborhood. Landscaping and preservation efforts also offer opportunities for education. School and conservation programs, community work parties and stewardship opportunities will involve residents in preservation and enhancement of their natural environment. Native wildlife will also provide a vital connection with the environment. The Bay Vista Preserve is an approximately 10 acre natural open space that will be preserved in a natural condition. The BHA has conducted a tree survey to identify all significant trees. Low impact trails and limited improvements will also be considered. 4. ROADS AND INFRAStRUCtURE Roads & Pedestrian Circulation Bay Vista’s thoroughfare system – streets, sidewalks and pedestrian paths, shown in Figure 4, is a fundamental element in site design, and will connect areas of the community to each other and to the surrounding neighborhood. The street design promotes pedestrian circulation, while maintaining automobile access for residents and visitors. The street layout provides multiple paths to each home and business, and reduces congestion by distributing traffic across the site. The design and dimensions of major types of streets are addressed in Section IV of the plan, "Zoning & Development Standards." In general, streets utilize narrower widths to reduce impervious area and to slow vehicle speed. Alleys are used for access to private parking for automobiles to preserve the desired pedestrian-orientation of the streetscape and front façades of residential structures. Basic streets types include the following: Neighborhood Streets – One-lane or two-lane roads (varying among neighborhoods) with on-street parallel parking. Sidewalks of varying width are provided on both sides of the street. These streets are lined with trees and include landscaping between the street and Table 1 – Bay Vista Land Use Land Use Zone Area (acres)Maximum Density Multi-family/Mixed Use 11 Up to 65 d.u./acre Multi-family/Senior Housing 6 Up to 65 d.u./acre Village Commercial 14 N/A Open Space 15 N/A Residential 21 Up to 38 d.u./acre Streets 16 N/A t O tAL 83 Up to 12 d.u./acre Notes: (1) See table A-1 for density and dimensional standards. 20 November 2012section III : Sub-Area planthe sidewalk. Bay Vista Boulevard – Provides access to the regional transportation system, is designed as a wider, tree-lined street with two traffic lanes, on-street parking and sidewalks on both sides. Alleys – Provides access to garages for parking and for deliveries and services for Single- Family Attached, Single-family Detached, and other unit types. Pedestrian Paths and “Green Streets” – These are separate from vehicle traffic and provide pedestrian- only between Bay Vista streets, connections between Bay Vista neighborhoods, parks and open spaces, retail activities and services. These paths will also connect to the off-site regional trail system. Infrastructure Bay Vista will be redeveloped with all new utilities and infrastructure, including sewer and water systems and stormwater management. Stormwater systems will include water quality treatment, which is not currently provided on the site. Low Impact Development (LID) approaches for stormwater management, including the use of pervious pavement in some street sections are being pursued in preliminary engineering and design. If feasible economically and geotechnically, this approach could increase infiltration of stormwater, recharge of groundwater, and could potentially reduce runoff below existing levels. Upgrading of the existing Oyster Bay outfall may not be necessary, in this case, to accommodate flows from Bay Vista. d. future CHanges to tHe suB area Plan The Bay Vista Master Plan and Sub-Area Plan are evolving documents and will change incrementally over time in response to changing regional economic conditions, and to ongoing planning, design, environmental review, public involvement and local decision-making. A degree of flexibility is inherent in large-scale, phased master plans; this flexibility is desirable to provide the ability to respond to changes in demographic, economic and market patterns over time. The initial Sub-Area Plan map, adopted in 2007, reflected the conceptual master plan for the site at that time and stage of planning. Some proposed land use designations allowed flexibility in uses, and contemplated that changes could be proposed in the future. For example, it was recognized that Bay Vista’s on-site population and financial requirements could support and/or require additional compatible retail development on the Bay Vista site. Additional retail development was incorporated in the revised Master Plan and Sub-Area Plan. Any significant changes to the conceptual land use map requires thorough consideration through a public review process, including review and action by the Planning Commission and City Council to amend the Comprehensive Plan. Appropriate environmental analysis is also required. Any changes also need to be consistent with the Sub-Area Plan’s goals and development standards. Such changes were proposed in 2008 to modify the Sub-Area Plan's boundaries, increase the number of residential units slightly, and to increase the size and intensity of on-site commercial uses. bay vista 21 section IV : ZONING & DEVELOPMENT REGULATIONSa. land use zones This section of the Sub-Area Plan contains the zoning and development standards that will guide the redevelopment of Bay Vista and will implement the requirements of the site’s zoning designation. The standards address the following elements: Land uses/zones, including density, height, setbacks, building coverage and impervious surface coverage; • General development standards; • Building design; • Streets, sidewalks and driveways; • Parking; • Landscaping; • Parks and open space; • Signs. Design standards are reviewed for conformity by the ARC, as discussed in Sec. III. The current zoning classification for the Bay Vista site is Master Development (MD) [Chapter 20.80 BMC]. The MD zone is applied to sites envisioned for large- scale planned development. These proposals must meet a public need and provide a community benefit, such as redeveloping “blighted” areas or providing affordable housing opportunities. Projects may be proposed by public entities or public-private partnerships, and should result in innovative development. Proposals in the MD zone are required to prepare a Master Development Plan (MDP), which includes standards for development of the site, including uses, density, setbacks, lot coverage and heights. Other required components of an MDP, which are addressed in these regulations, include the following: • An open space plan that protects natural resources and provides recreational opportunities; • Site edge design that is compatible with adjacent uses and densities; • Streetscapes that include amenities, (street trees, planting strips, benches, street lighting, etc.) and other design features that make streets interactive, walkable and enjoyable; • A general landscape plan, including preservation of significant trees where possible; • Adequate off-street parking, which may modify standard requirements if a parking study demonstrates no impact on adjacent properties. 1. LAND USE & DIMENSIONAL StANDARDS Land uses within Bay Vista and applicable dimensional standards are identified in Table A-1, Density and Dimensional Standards and Figure A-2, Land Use Map. 2. RESIDENtIAL Intent: The intent of the residential (R) zone is to accommodate a variety of housing types at varying densities consistent with creation of a mixed-income, mixed-use pedestrian-oriented community. Housing types may include single-family attached and detached in a variety of styles. Multi-Family housing may also occur in mixed-use buildings. Residential standards shall be in accordance with the standards of BMC 20.60 with the following additions and/or revisions: i. Permitted Uses and Density a. Permitted Uses (i) Provided that they are consistent with the intent of the Zone, all uses are permitted outright, provided that the Development Standards specified in Section IV are satisfied. The applicant shall bear the burden of proving that a proposed use achieves the stated intent of the particular zone. b. Use Definitions (i) Definitions of the specific land uses are found in BMC Chapter 20.40. c. Decision Authority (i) A use determination made by the Director may be appealed to the Hearing Examiner iV - Zoning & de VeLopment reguLAtions 22 November 2012section IV : ZONING & DEVELOPMENT REGULATIONSVILLAGE COMMERCIAL MULTI-FAMILY/ SENIOR HOUSING OPEN SPACE PARKS MULTI-FAMILY/MIXED USE LOW OR MEDIUM DENSITY RESIDENTIAL FIGURE 4 - LAND USE PLAN LEGEND Figure A-2 – Land Use Plan bay vista 23 section IV : ZONING & DEVELOPMENT REGULATIONSfollowing a Type II decision process as set forth in BMC Chapters 20.02 and 20.40 ii. Dimensional Standards: Standards for height, setback, yards, building coverage and site coverage shall be consistent with Table A-1. iii. Public Space Requirements the following public space requirements to residential development: a. Pedestrian-oriented spaces, amenities and corridors shall be incorporated in the overall site design. b. Pedestrian areas shall be easily accessible, clearly visible and located to take advantage of surrounding features such as building entrances, open spaces, significant landscaping, unique topography or architecture, and solar exposure. iv. Development Standards: a. Residential building density, height, yards/setbacks, building coverage and site coverage, shall be consistent with the standards in Table A-1. b. Garages & Integral Garages: (i) Integral garages incorporated into residential structures should not face the street, except for lots not served at the rear by alleys. Where garage doors facing the street are permitted, they should be set back from the front facade, and should contain at least 25% glazing. Driveways shall be a minimum length where any vehicle parked in front of the garage shall not protrude onto the sidewalk. c. Landscaping: Landscaping shall meet the requirements of Subsection G of these regulations. d. Building Orientation and Design Elements: (i) Residential: When located at block corners, buildings shall have two primary facades (composed of the same materials) that are oriented to the two streets. v. Fire Protection Systems: Due to the road widths proposed in this plan, all residential units shall be protected by a fire-sprinkler system. vi. Lot Standards a. Residential: minimum lot width shall be 30 feet. 3. MIxED USE Intent: The intent of the Mixed-Use zone is to further the goal of creating a traditional, mixed-use pedestrian-oriented community by allowing a complementary mix of residential and non-residential uses to locate within the same building or stand alone multi family buildings. Mixed-Use standards shall be in accordance with the standards of BMC 20.60 with the following additions and/or revisions: i. Permitted Uses and Density: a. Provided that they are consistent with the intent of the Zone, all uses are permitted outright except those uses listed prohibited in Section IV.A.3.ii, and provided that the Development Standards specified in Section IV are satisfied. The applicant shall bear the burden of proving that a proposed use achieves the stated intent of the particular zone. ii. Prohibited Uses: The following uses are prohibited: a. Adult entertainment b. Automobile sales c. Light and heavy industrial/manufacturing uses iii. Dimensional Standards a. Standards for setback, yards, building coverage and site coverage are indicated in Table A-1, Density & Dimensional Standards. iv. Public Space Requirements a. Pedestrian-oriented spaces, amenities and corridors shall be incorporated in the overall site design. b. Pedestrian areas shall be easily accessible, clearly visible and located to take advantage of surrounding features such as building entrances, open spaces, significant landscaping, unique topography or architecture. c. Delineate pedestrian areas through the use of different paving materials, scored paving surfaces, built-in planters, landscape areas and freestanding site furniture. v. Development Standards Site development shall be in accordance with the standards of BMC 20.66.060 with the following 24 November 2012section IV : ZONING & DEVELOPMENT REGULATIONSadditions and revisions: a. Buildings should be arranged to facilitate integration and use of plazas, courtyards, and greens. b. Sites should be designed to create an identifiable pedestrian urban character. Methods to achieve this concept include: (i) Providing well-defined pedestrian walkways or circulation from parking areas, public sidewalks, and building/shop entrances throughout the site. (ii) Designing surface parking areas to avoid long rows of uninterrupted parking. (iii) Where possible, sites shall be designed to provide vehicle and pedestrian connections to adjacent sites and activity areas. c. Outdoor lighting standards The following standards apply to all uses and development within this zone: (i) Except for intermittent security lighting on motion detectors, all lights more than seven feet above the ground shall be directed downward and have high cut-off light angles. (ii) Large areas may be lit with a number of low- intensity sources close to the area requiring illumination. Illumination of a large area with a remote single source of light shall be prohibited. (iii) Lighting shall not be cast beyond the premises and shall be limited to illumination of surfaces intended for pedestrians or vehicles. Illumination of landscaped areas shall be avoided unless the landscaped area is immediately adjacent to the building. (iv) Pole lights shall be no taller than 25 feet above a 36-inch base in parking lots, traffic areas, or pedestrian areas. d. Site furnishings: Incorporate outdoor furniture, fixtures, and streetscape elements into the site design that enhance and complement the commercial functions of the site. Miscellaneous structures and street furniture should be designed to be part of the architectural design and landscape. The following requirements will assure consistency in site furnishing design and are applicable to all non-residential uses. The following standards shall apply: (i) Utilize lighting, free- standing signs, trellises, arbors, raised planters, benches and other forms of seating, trash receptacles, bus stops, phone booths, fencing, or other outdoor furniture or streetscape fixtures in the site design to create and define public spaces. (ii) Locate site furnishings to maximize visual surveillance of the area by residents, pedestrians and passing vehicles to minimize covert activities in the space and lessen risks to public safety. (iii) Site furnishings should be a commercial-grade designed for heavy public use. 4. VILLAGE COMMERCIAL Intent: Promote attractive, unified, and viable commercial businesses that serve the needs of the community and provide jobs. Emphasize pedestrian activity, safety and security while still providing for drive thrus adequate auto and truck access. i. Permitted Uses: a. Provided that they are consistent with the intent of the Zone, all uses are permitted outright except those uses listed prohibited in Section IV.A.4.ii, and provided that the Development Standards specified in Section IV are satisfied. The applicant shall bear the burden of proving that a proposed use achieves the stated intent of the particular zone. b. Use Definitions: (i) Definitions of the specific land uses are found in BMC Chapter 20.40. c. Decision Authority: (i) A use determination made by the Director may be appealed to the Hearing Examiner following a Type II decision process as set forth in BMC Chapters 20.02 and 20.40 ii. Prohibited Uses: a. The following uses are prohibited: (i). Adult entertainment (ii). Automobile sales (iii). Light and heavy industrial/manufacturing uses iii. Dimensional Standards a. Standards for setback, yards, building coverage and site coverage are indicated in Table A-1, Density & Dimensional Standards. iv. Public Space Requirements a. Pedestrian-oriented spaces, amenities and corridors shall be incorporated in the overall site design. bay vista 25 section IV : ZONING & DEVELOPMENT REGULATIONSb. Pedestrian areas shall be easily accessible, clearly visible and located to take advantage of surrounding features such as building entrances, open spaces, significant landscaping, unique topography or architecture. c. Delineate pedestrian areas through the use of different paving materials, scored paving surfaces, built-in planters, landscape areas and freestanding site furniture. v. Development Standards Site development shall be in accordance with the standards of BMC 20.66.060 with the following additions and revisions: a. Buildings shall be arranged to facilitate integration and use of plazas, courtyards, and greens. b. Sites shall be designed to create an identifiable pedestrian urban character. Methods to achieve this concept include: (i) Providing well-defined pedestrian walkways or circulation from parking areas, public sidewalks, and building/shop entrances throughout the site. (ii) Designing surface parking areas to avoid long rows of uninterrupted parking. (iii) Where possible, sites shall be designed to provide vehicle and pedestrian connections to adjacent sites and activity areas. c. Outdoor lighting standards The following standards apply to all uses and development within this zone: (i) Except for intermittent security lighting on motion detectors, all lights more than seven feet above the ground shall be directed downward and have high cut-off light angles. (ii) Large areas may be lit with a number of low- intensity sources close to the area requiring illumination. (iii) Lighting shall not be cast beyond the premises and shall be limited to illumination of surfaces intended for pedestrians or vehicles. Illumination of landscaped areas shall be avoided unless the landscaped area is immediately adjacent to the building. (iv) Pole lights shall be no taller than 30 feet above a 36-inch base in parking lots, traffic areas, or pedestrian areas. d. Site furnishings: Incorporate outdoor furniture, fixtures, and streetscape elements into the site design that enhance and complement the commercial functions of the site. Miscellaneous structures and street furniture should be designed to be part of the architectural design and landscape. The following requirements will assure consistency in site furnishing design and are applicable to all non-residential uses. The following standards shall apply: (i) Utilize lighting, free- standing signs, trellises, arbors, raised planters, benches and other forms of seating, trash receptacles, bus stops, phone booths, fencing, or other outdoor furniture or streetscape fixtures in the site design to create and define public spaces. (ii) Locate site furnishings to maximize visual surveillance of the area by residents, pedestrians and passing vehicles to minimize covert activities in the space and lessen risks to public safety. (iii) Site furnishings should be a commercial-grade designed for heavy public use. vi. Building Orientation and Design Elements a. Blank walls shall not face streets, unless modulated or landscaped. b. For surface development buildings may generally follow the alignment of the streets they front. vii. Architectural Building Elements and Character Design Intent: To create a collection of buildings that presents a unified character while allowing for the individual architectural expression of each building. The design character of an individual building should be compatible (share similar features such as color, scale, massing, width, setback and height and use) with its commercial neighbors on either side and across the street or plaza. a. Building Scale: Design Intent (i) To provide a consistent architectural scale throughout, which is appropriate to a pedestrian environment. (ii) To create a concentration of buildings near the plaza and along the street. (iii) To achieve an inviting and interesting set of buildings with distinctive character. (iv) To ensure that the buildings present a varied response to streets and public spaces. (v) To create strongly identifiable elements and Land Use/ Zone Density (Net dwelling units (d.u.) per acre) Maximum Height Front Yard (Building Setback) (1)(ft) Side Yards (ft) (1,2) Rear Yards: d.u. or commercial space / garage (ft) (2,3) Maximum Building Coverage (4) Maximum Site Coverage (5) Residential Up to 38 d.u./acre 30 feet 10 (6)5 5/2 90%95% Mixed Use/ Multi-Family/ Senior Housing Up to 65 d.u./acre; + up to 7,500 SF of non-residential use permitted on the ground floor facing public street 65 feet 0 0 5/2 90%100% Village Commercial N/A 65 feet 0 0 0 90%95% (1) Corner lots shall have two (2) front yards and only one (1) side yard. (2) Side and rear yard setbacks are subject to additional requirements contained in subsection 5.B. Development Standards. (3) Where garage is attached or integral to a dwelling unit, and there is no rear yard, the minimum rear yard setback shall be five (5) feet for dwelling space, and two (2) feet for garage. Across an alley the distance between facing garages shall be 24 feet minimum. A deck that does not exceed thirty (30) inches in height above the finished grade may encroach within the rear-yard setback area to within three (3) feet of the property line. (4) Includes all area covered by structures and roofs, except roof overhangs of 2 feet or less. (5) Includes area covered by structures and roofs, as defined above, and all impervious site materials. (6) Additional front yard setback as required by utility provider. 26 November 2012section IV : ZONING & DEVELOPMENT REGULATIONSTable A-1 – Density and Dimensional Standards bay vista 27 section IV : ZONING & DEVELOPMENT REGULATIONScivic gathering places that encourages a sense of community and a sense of place. (vi) To encourage use of good quality materials with low maintenance life-cycle cost. b. Building Modulation and Articulation (i) Building street façades or walls facing pedestrian plazas should be modulated to break down the scale and have the varied look of multiple buildings. (ii) Building masses and edges along the street or facing pedestrian plazas shall be articulated with windows, entryways and vertical and horizontal elements that provide interest. (iii) Modulation and articulation may be accomplished in a number of ways, including: (a) The stepping back or projection of a portion of the facade. (b) Include significant building elements, such as balconies, bay windows, porches, stoops, pergolas, arcades, canopies or other pedestrian weather-protection elements, towers, turrets, entry areas, etc. (c) Building focal points, which include distinctive entry features, etc. (d) Articulation of the roofline and/or manipulating roof forms using gable-ends or dormers. (e) Changing materials and/or colors. c. Articulate aspects of building function and design through treatment of windows, doors, enhanced entryways, corners with special trim, molding or glazing; decorative building materials, such as tile and metal work; balconies at upper stories; multiple-paned windows; decorative railings, grillwork or landscape guards; landscape trellises; or decorative light fixtures. viii. Building Roof a. Flat roofs and sloped roofs are allowed. If flat roofs are used, cornices or projections are encouraged to delineate roof edges and help with building modulation. b. Roof mounted mechanical equipment (HVAC) shall be screened from view with structural elements or screens constructed of materials and details compatible with those used in the building. ix. Architectural Building Materials Intent: To enhance the quality of both individual buildings and the commercial center streetscape as a whole. To encourage the use of traditional forms, details, and good quality low maintenance materials with low life cycle costs. a. The materials of building elements such as roofs (where exposed to view), exterior walls, trim, and other miscellaneous elements, should be durable yet should also possess an enduring commercial character. b. The use of materials which provide textural interest is encouraged for both roofs and walls (precast concrete, masonry, brick, ornamental steel, metal panels, wood or cementitious siding). x. Service Areas Intent: To screen service and utility elements from view while providing efficient service areas. a. Building service elements and utility equipment shall be contained within the building envelope to the extent practical so as not to physically encroach on or visually impact public pedestrian areas. b. All on-site service areas, loading zones, waste storage, recycling collection, disposal facilities, transformer and utility vaults and similar activities shall be located in an area not visible from a public street or open space. If this is not possible, then the service area, loading zone, or storage area must be screened from public view. Acceptable screening includes: (i) Materials matching or compatible with the adjacent building wall. (ii) An opaque landscape hedge or other screening device as approved by the City. Chain link fencing with/without slats is not permitted. (iii) Service/utility areas or enclosures shall not be located in or be visible from the public plaza or courts. 5. OPEN SPACE Intent: The intent of the Open Space (OS) zone is to recognize those areas, whether public or private, that are intended to be maintained and used for active or passive open space, parks, recreational activities or tree preservation. Such areas may include squares or plazas that are integrated into intensively developed portions of the site. i. Permitted Uses & Density: a. Parks and open spaces used for active recreation and/ or passive enjoyment, including developed recreational facilities 28 November 2012section IV : ZONING & DEVELOPMENT REGULATIONSb. Squares or plazas c. Trails, pervious or impervious, for non-motorized use d. Schools and playgrounds e. Maintenance facilities not exceeding 500 square feet f. Maintenance of trees, vegetation, and landscaping h. Irrigation systems i. Benches, picnic tables, pergolas, & similar amenities j. Fountains, sculpture and artwork k. Stormwater management facilities l. Utilities and utility structures m. Interpretive signs and displays iii. Bay Vista Preserve Management Plan. A management plan will be prepared for this significant open space. The plan will be developed with community input and will address vegetation management, selective thinning to remove unhealthy trees and invasive species, and the appropriate types of improvements. B. general deVeloPment standards General Development Standards shall be in accordance with the standards of BMC 20.44 and 20.46 with the following additions and/or revisions: 1. FENEStRAtION The following additional architectural requirements apply to Village Commercial along Bay Vista Boulevard: i. Streets and windows shall have a maximum sill height above the ground or sidewalk of 36 inches. 2. BUILDING HEIGHt i. Building height is defined as the distance from the average finish grade at the façade to the highest point of a flat roof, or midpoint of the sloping surface of a pitched roof. Refer to Figure B-1. ii. tower elements, not more than 300 square feet in footprint, may exceed the maximum building height by 12 feet. 3. BUILDING SEtBACKS i. Refer to table A-1 Density & Dimensional Standards. bay vista 29 section IV : ZONING & DEVELOPMENT REGULATIONSC. streets, sidewalks and driVeways 1. StREEt StANDARDS Bay Vista’s circulation system – streets, sidewalks and pedestrian paths – is an important element in site design and providing connectivity on and off-site. The locations of streets by type are shown in Figure D-1, Thoroughfare Map. Streets, driveways and sidewalks shall be constructed using the standards described below and shown in Figure D-2, Street Sections. Street Standards shall be in accordance with the standards of BMC Title 11 with the following additions and/or revisions: i. Street Section 1 a Description: Two-lane streets with on-street parking, sidewalks and trees on both sides. Connects neighborhoods within Bay Vista. b. Standards: (i) Total right-of-way: 45-58 feet (ii) Travel lane: (2) 8-11 feet wide (iii) On-street parking (one & two sided): 7 feet wide (a) On-street parking optional within village commercial area. (iv) Sidewalks: 5 feet wide (v) Planting strips/swale: (a) Six feet wide (including half-foot curb) on each side. (b) Street trees shall be placed every 40 feet (or equivalent) and shall be 2.5-inch caliper minimum at time of planting. Recommended species are identified at the end of Subsection G "Landscape Standards." (c) Optional single swale on one side: 11 feet wide with 6 feet wide sidewalk on opposite side of street. Option provided to allow flexibility in storm drainage and streetscape design. c. Lighting: (i) Ornamental street lights shall be used per Section J8. ii. Street Section 2 a. Description: Two-lane streets with on-street parking, sidewalks and trees on both sides. Connects neighborhoods within Bay Vista. b. Standards: (i) Total right-of-way: 47-52 feet (ii) Travel lane: (2) 8-9 feet wide (iii) On-street parking (one & two sided): 7 feet each side (iv) Sidewalks: 5 feet wide (v) Planting strips/swale: (a) Six feet wide (including half-foot curb) on each side (b) Street trees shall be placed every 40 feet (or equivalent) and shall be 2.5-inch caliper minimum at time of planting. Recommended species are identified at the end of Subsection G “Landscape Standards." c. Lighting: (i) Ornamental street lights shall be used per Section J8. iii. Street Section 3 a. Description: A commercial street with two traffic lanes, on street parking, sidewalks and trees on both sides. b. Standards: (i) Total right-of-way: 54 feet (ii) Travel lanes: (2) 9 feet wide (iii) On-street parking (both sides): 7 feet each side (iv) Sidewalks: 5 feet wide (v) Planting strips: (a) Six feet wide (including half-foot curb) on one side (b) Street trees shall be placed every 40 feet (or equivalent) and shall be 2.5-inch caliper minimum at time of planting. Recommended species are identified at the end of Subsection G “Landscape Standards.” iv. Street Section 4 a. Description: A two-lane street with on-street parking, sidewalks and trees on one side. b. Standards: (i) Total right-of-way: 34.5-36.5 feet (ii) Travel lanes: (2) 8-9 feet wide (iii) On-street parking (one side): Seven feet wide (iv) Sidewalk: 5 feet wide (v) Swale: (a) Six feet wide (including half-foot curb) on one side (b) Street trees shall be placed every 40 feet (or equivalent) and shall be 2.5-inch caliper minimum at time of planting. Recommended species are identified at the 30 November 2012section IV : ZONING & DEVELOPMENT REGULATIONSend of Subsection G “Landscape Standards.” v. Street Section 5 a. Description: A two-lane street with on-street parking, sidewalks on both sides and trees on one side. b. Standards: (i) Total right-of-way: 46.5 feet (ii) Travel lanes: (2) 8 feet wide (iii) On-street parking (both sides): 7 feet wide (iv) Sidewalk: 5 feet wide (v) Swale: (a) Six feet wide (including half-foot curb) on one side (b) Street trees shall be placed every 40 feet (or equivalent) and shall be 2.5-inch caliper minimum at time of planting. Recommended species are identified at the end of Subsection G “Landscape Standards.” vi. Green/Pedestrian Streets a. Description: Landscaped pedestrian paths that connect Bay Vista neighborhoods, parks and services. b. Standards: (i) Minimum Width: 8 feet (ii) Sidewalks: Shall have a maximum width of 4 feet (iii) Planting strips: Shall have a minimum width of two feet (both sides) vii. Alleys a. Description: Alleys provide access to for private automobile parking, either in garages or on grade, and for deliveries and services for specified types of units. b. Standards: (i) Total right-of-way (garage face to garage face): 24 feet. (ii) Travel lane: 14 feet (iii) Planting strips (both sides): 3 feet c. Alley entrances shall not be located along streets that bound on a public green space. d. The alley entrance should be a minimum of 55 feet from an intersection measured from the perpendicular right-of-way line of the cross street. e. Driveway Entrances (i) Standards: Private driveways shall only be allowed when there is no automobile access from an alley. (ii) Where driveways are allowed, the entrances shall not be located on streets that border a public open space along streets that do not front on a public green space. (iii) The driveway entrance should be a minimum of 55 feet perpendicular right-of-way line of the cross street. (iv) All driveway aprons shall be paved with concrete. bay vista 31 section IV : ZONING & DEVELOPMENT REGULATIONSd. low imPaCt deVeloPment 1. INCLUSION OF LOW-IMPACt DEVELOPMENt (LID) Buildout of the Bay Vista Sub-Area Plan shall incorporate LID to the greatest feasible extent, while also recognizing that site, topography, soils and other conditions may limit the inclusion of LID techniques for stormwater. The development team shall apply good faith efforts, explore and seek to include LID measures. In its review of preliminary plat engineering and design the City may impose conditions to reasonably accommodate LID while also recognizing site-specific limitations. Inclusion of all LID shall fit within the land use framework established in this Sub-Area Plan. 2. DESIGN Design of LID techniques such as rain gardens, pervious pavements etc. shall be in accord with the design criteria of the Washington State Department of Ecology's Low Impact Development Technical Guidance Manual for Puget Sound or the City of Bremerton Public Works and Utilities Department. 3. FLOW CREDItS LID techniques are intended to reduce the amount of stormwater runoff required to be handled with treatment and conventional flow control facilities. The City of Bremerton shall grant Flow Credits for all LID techniques included in Bay Vista. Flow Credits are reductions to the volume of stormwater runoff the City requires to be handled with conventionally engineered facilities. Flow Credits shall be determined per the modeling methods described in Chapter 7 of the Washington State Department of Ecology's Low Impact Development Technical Guidance Manual for Puget Sound or the City of Bremerton Public Works and Utilities Department. e. Parking standards Intent: Assure that sufficient space is provided for the parking, loading and unloading of motor vehicles. Provide minimum and maximum standards of space and parking arrangements, and for the movement of motor vehicles into and out of such spaces. Encourage the creation of an aesthetically pleasing and functionally adequate system of off street parking and loading facilities. Parking shall be provided in accordance with BMC 20.48 with the following exceptions and modifications: 1. GENERAL REQUIREMENtS i. Off-street parking spaces and driveways shall be used for the temporary storage of motor vehicles used by persons visiting or having business to conduct on the premises for which the parking is provided. ii. Parking space required and intended for use by occupants or users of specific premises shall not be leased or rented to others, nor shall such space be made unavailable through other means to the users for whom the parking spaces are intended. this, however, does not preclude shared parking arrangements or other activities approved by the city iii. Except where specifically permitted in certain zoning designations, off-street parking spaces shall not be used for loading or unloading of commercial vehicles larger than those vehicles for which the parking spaces are intended. iv. Structured parking, not including private single- and two-car garages, shall not be allowed with the exception of the high density apartment parcels. Structured parking shall be located behind liner buildings of appropriate allowed uses as described elsewhere in this document. v. Off-street parking space dimensions shall be as follows: a. Compact spaces shall be a minimum of 7.5 feet wide; b. Standard spaces shall be a minimum of 8.0 feet wide; c. Standard spaces shall be a maximum of 10.0 feet wide; 32 November 2012section IV : ZONING & DEVELOPMENT REGULATIONSd. Compact spaces shall be a minimum of 15 feet in length. Standard spaces shall be a minimum of 18.0 feet in length; up to 2.0 feet may overhang curb or wheel stops. e. Exceptions to the above minimum dimensions shall be granted for handicapped accessible spaces. Applicable state and federal codes and requirements for accessible parking spaces shall supersede any requirements herein. vi. Parking and loading areas shall be graded for proper drainage and provided with a suitable surface, as approved by the city engineer. vii. All driveways and areas used for loading, parking and maneuvering motorized vehicles shall be paved. Gravel surfaces are not allowed. viii. Each parking or loading space must be usable and readily accessible. ix. Required parking and loading areas shall be provided with designated entrances and exits located so as to minimize traffic congestion and avoid undue interference with public use of streets, alleys and walkways. x. Parking and loading areas provided in accordance with the requirements of these standards shall not be used for the sale, repair, assembly or disassembly, storage or servicing of vehicles or equipment. Unlicensed and inoperable vehicles shall not be stored in any required parking or loading space. xi. If existing parking lots are re-striped, the new layout of the parking spaces shall be the same as the previous layout; or if changed, the changed layout shall conform to the existing dimensional requirements of this chapter. Automobile Spaces Bicycle Spaces Land Use Category Minimum Maximum Residential: Single Family/Duplex 1:d.u.2:d.u.N/A Single Family ADU 1:d.u.1:d.u.N/A Multi-Family 1:d.u.2:d.u.N/A Apartment 1:d.u.2:d.u.1:10d.u. Business/Commercial: Retail 3:1,000 g.s.f.5:1,000 g.s.f.1:5,000 g.s.f. Offices 3:1,000 g.s.f.5:1,000 g.s.f.1:2,500 g.s.f. Restaurant 4:1,000 g.s.f. of seating area 5:1,000 g.s.f. of seating area 1:500 g.s.f. of seating area Medical/Dental 3.5:1,000 g.s.f.5:1,000 g.s.f.1:2,500 g.s.f. Hotel/Inn 1:room 1.5:room N/A All Other Commercial Not Specified 3:1,000 g.s.f.5:1,000 g.s.f.1:2,500 g.s.f. Educational 2:1,000 g.s.f.4:1,000 g.s.f.1:1,000 g.s.f. Community Facility 1:1,000 g.s.f.3:1,000 g.s.f.1:1,000 g.s.f. Table F-1 – Parking Requirements bay vista 33 section IV : ZONING & DEVELOPMENT REGULATIONS2. COMPACt CAR ALLOWANCE i. A maximum of 30 percent of the total required off- street parking stalls may be permitted and designated for compact cars in Village Commercial. ii. Each compact stall shall be designated as such. iii. Dimensions of compact parking stalls shall conform to the standards as depicted in this chapter. iv. the maximum compact car allowance may be exceeded if an applicant submits a vehicle composition study, relevant to the type of development, which demonstrates that a greater number of compact vehicles should be accommodated. 3. BICyCLE PARKING i. the required minimum number of bicycle parking spaces for each use category is shown on Table F-1. Bicycle parking spaces are meant to accommodate residents, employees, visitors, customers, messengers, and other persons. ii. Bicycle parking shall be located on site within 50 feet of well-used entrances and not farther from the entrance than the closest motor vehicle parking space. Bicycle parking may be located within city right-of-way in areas without building setbacks, subject to approval of the director and provided it meets the other bicycle parking requirements. 4. OtHER REQUIRED PARKING SPACES i. Motorcycle Parking Requirements. Motorcycle spaces shall be required in non-residential areas only at a rate of 1 per 100 automobile spaces with a minimum of 1 motorcycle space provided. 5. DRIVE-tHROUGH StACKING REQUIREMENtS i. A stacking space shall be an area measuring 8 feet by 20 feet with direct forward access to a service window of a drive-through facility. A stacking space shall be located to prevent any vehicles from extending onto the public right-of-way, or interfering with any pedestrian circulation, traffic maneuvering, or other required parking areas. Stacking space for drive-through or drive-in uses may not be counted as required off-street parking spaces. ii. For each drive-up lane a minimum of three stacking spaces shall be provided. iii. Stacking spaces serving businesses that are located adjacent to a less intensive zone than that in which the business is located, or are located adjacent to a public use area (such as a street, sidewalk, park, or trail) shall be landscaped to provide a buffer between the stacking spaces and the adjacent zone or public use. 6. StRUCtURED PARKING i. Structured parking shall be located behind the block perimeter buildings. Structured parking may also be located below buildings. ii. Structured parking shall be screened, except at the actual vehicular entry points and shall be screened. iii. Vehicular and service entries to garages shall be designed to look like a part of the building. iv. Parking garages: Parking garages with flat roofs may not exceed the height of the shortest building on the block when a flat roof is present on any building on the block, and parking garages with pitched roofs may not exceed the height of the shortest building on the block by more than one story. 7. ON-StREEt PARKING i. On-street parking shall count as visitor parking. Each 24 feet of curb length, excluding 5 feet on either side of a curb cut, shall count as one visitor parking space. 34 November 2012section IV : ZONING & DEVELOPMENT REGULATIONSf. landsC aPe standards Intent: In addition to the significant parks and open space included in the Sub-Area Plan, the Bay Vista site will include significant landscaping with retained and new trees and vegetation. Landscaping will be focused along streets to enhance the pedestrian environment, along the site’s boundaries with arterials to provide screening, and adjacent to the commercial area to provide land use transitions. In some areas, such as the Bay Vista Village and Sinclair Square, hardscape and green features will be mixed. 1. GENERAL DEVELOPMENt StANDARDS i. Landscaping shall be provided in accordance with BMC 20.50 with the following additions and/revisions: ii. Landscaping shall be constructed using the standards described below. 2. PARkS ANd OPEN SPACE General Requirements: The following types and amounts of parks and open space will be provided in Bay Vista: i. Active Open Space: a. Approximately 3-5 acres of land should be allocated for active open space. ii. Passive Open Space: a. Approximately 10-11 acres of land should be allocated for passive open space, with a natural/preservation area as the central element. A proposed park is leveraged on these features and will create a sense of arrival from two edges of the development as well as a view corridor of the greater Bremerton area. b. Tree Preservation Open Space: c. Approximately 3 acres of land should be allocated for tree preservation, which will protect a large expanse of second growth trees and a steep slope. This large forested area will provide an anchor to the natural environment, a regionally sensitive context for the neighborhood, and a signature identity for the community. d. Public Ways: A network of approximately 30,000 linear feet of sidewalks and paths should be allocated which will create a pleasant and convenient pedestrian environment. 3. LOCAtION AND DESIGN OF PARKS & OPEN SPACE The general locations of open space are shown on Figure 4, Land Use Plan. The design concept and development standards for on-site parks are described below. i. the Bay Vista Preserve will be a large, multi-faceted green space located in the center of the site. It will be focused primarily on the preservation and enhancement of the existing native area with passive recreation throughout and an area of active recreation at the south. It should contain the following: a. Walking paths. b. Recreation and community space. c. Defined by the large existing stand of trees and homes at its perimeter. d. The north area of the park will be dedicated to the preservation of native species, the central area will be a transition and planted with native plant species that draws the northwest character south. The south area will be the most active with open lawn accented by native plant species. e. Both existing and new native landscape. Existing areas shall be enhanced through the addition of native species and the removal of invasive species. The new areas shall be an opportunity to extend the native area and provide an area of successional planting. ii. Periwinkle Park is located on the eastern edge of Bay Vista, at Oyster Bay Road, and will serve as a multi- generational, multi-use park. It is intended to be an expression of the northwest through its layout and plant material. 4. tREE AND VEGEtAtION PRESERVAtION REQUIREMENtS i. Provide a tree survey conducted by an ISA certified arborist at the time of site plan permit application to bay vista 35 section IV : ZONING & DEVELOPMENT REGULATIONSSCREENING/BUFFER BIOSWALE EXISTING BUILDING OPEN SPACE EXISTING LANDSCAPE TO BE RETAINED & SUPPLEMENTED FIGURE 5 - LANDSCAPE PLAN LEGEND Figure G-1 – Landscape Plan SECTION 1 (2-Sided Parking) FIGURE D-1 THOROUGHFARE MAP LEGEND SECTION 1 (1-Sided Parking) SECTION 2 (1-Sided Parking) SECTION 3 (2-Sided Parking) SECTION 4 (1-Sided Parking) Figure D-1 – Thoroughfare Map 36 November 2012section IV : ZONING & DEVELOPMENT REGULATIONS bay vista 37 section IV : ZONING & DEVELOPMENT REGULATIONSidentify and designate all trees and vegetated areas located within lots and yards that can reasonably be retained. ii. Provide adequate protection for retained vegetation. iii. Any tree proposed or required to be retained and which is subsequently lost or destroyed must be replaced with at least three six-foot trees or one 18- foot tree or one 12-foot tree plus one six-foot tree of the same species, located as directed by the architect. iv. topping or trimming trees in a manner that alters the natural symmetry of a tree is not allowed unless necessary for safety reasons as certified by an arborist. 5. PARKING LOt DESIGN & LANDSCAPING Parking lots shall meet the Parking Lot Design and Landscaping requirements of BMC 20.48 and 20.50, with the following changes: i. Surface parking lots shall be located behind buildings wherever feasible. ii. Screening with evergreen plantings shall be provided for parking lots in the following locations: a. Any parking lots visible from Kitsap Way, SR 3, or from internal streets; b. Parking lots abutting residential/mixed-use uses or zones; c. Landscape requirements are one plant unit per twenty spaces, with a minimum of one island for every ten spaces. iv. Where a tree planting island occurs the entire length of a bay, there shall be a minimum of one tree planting island every fifteen spaces and a large shade tree every fifteen spaces in a tree planting island; v. Where a tree planting island occurs, the entire length of a bay, the entire length shall be planted with large shade trees every forty five feet. 6. ADDItIONAL LANDSCAPING REQUIREMENtS APPLICABLE tO ALL DEVELOPMENt SHALL INCLUDE tHE FOLLOWING: i. Maximize privacy between residences and their private outdoor spaces while encouraging community interaction in the public realm; ii. Minimize visibility of utilities and other unsightly necessities; iii. Planting on slopes in open space and commercial areas: a. On slopes between 4:1 to 2:1 mass plantings of trees and shrubs are suggested. b. Slopes over 2:1 require erosion control measure such as jute matting with ornamental grasses or groundcovers. v. Neighborhood parks, squares or plazas should be designed and landscaped to reinforce the civic nature of these spaces, provide the appropriately scaled amenities and reflect the anticipated function and type, and intensity of use. ix. Plant Selection a. Planting Materials. A general planting list is included at the end of this section. (i) Other plant materials may be considered that have these characteristics and similar maintenance requirements; b. Plants on Sloping Areas: (i) Plants on slopes shall be selected for their ability to develop deep roots and thereby knit the soil into a cohesive mass. (ii) Plants shall consist of native and adaptive species that can withstand drought in summer as well as continually wet soil in winter. 7. IRRIGAtION i. All irrigation systems, with the exception of residential systems, shall be designed by a qualified irrigation designer. 38 November 2012section IV : ZONING & DEVELOPMENT REGULATIONSsuggested plant List *Indicates native species DECIDUOUS tREES Small: Acer circinatum – Vine Maple* Acer japonicum – Full Moon Maple Acer griseum – Paperbark Maple Acer palmatum – Japanese Maple Amerlanchier alnifolia – Serviceberry * Amelanchier var. – Serviceberry varieties Cornus – ‘Eddie’s White Wonder Dogwood’ Cornus kousa – Kousa Dogwood Cornus mas – Cornelian Cherry Cornus nuttallii – Pacific Dogwood * Corylus cornuta – Western Hazelnut * Magnolia kobus – Kobus Magnolia Malus fusca – Western Crabapple * Malus sp. – Crabapple (some) Oxydendrum arboreum – Sourwood Prunus cerasifera var. – Purple Leaf Plum varieties Prunus virginiana ‘Canada Red’ – Canada Red Choke Cherry Stewartia Styrax japonicus – Japanese Snowbell Medium: Acer rufinerve – Redvein Maple Acer truncatum x platanoides “Warrenred” – Pacific Sunset Maple Acer truncatum x platanoides“ Keithsform” – Norwegian Sunset Maple Malus sp. – Some Crabapples Parrotia persica – Persian Parrotia Pyrus calleryana var. – Flowering Pear Varieties Prunus sp – Flowering Cherry Prunus s. ‘Shirotae’ – Shirotae Cherry Columnar Narrow: Carpinus betulus pyramidalis – Pyramidal Hornbeam Fagus sylvatica ‘Cockleshell’ – European Beech Gingko biloba ‘Princeton Sentry’ – Maidenhair tree Parrotia persica ‘Vanessa’ Prunus sargenti columnaris – Columnar Sargent Cherry Pyrus calleryana ‘Glen’s Form’ – Chanticleer Pear CONIFERS Abies grandis – Grand Fir * Abies koreana – Korean Fir Calocedrus decurrens – Incense Cedar Chamaecyparis nootkatensis ‘Pacific Arrow’ – Alaska Cedar Juniperus scopulorum (var.) –Juniper Picea omorika – Serbian Spruce Pinus monticola – Western White Pine * Pseudotsuga menziesii – Douglas fir * taxus baccata – yew thuja plicata ‘Excelsa’ – Western Red * tsuga heteropylla – Western Hemlock * SHRUBS Smaller shrubs and Ground Cover: Arctostaphylos columbiana – Hairy Manzanita * Arctostaphylos uva-ursi – Kinnikinnick varieties * Berberis (var.) – Dwarf Barberry varieties Camassia quamash – Common Camas * Fothergilla sp. Fragaria chiloensis – Sand Strawberry * Gaultheria shallon – Salal * Ilex crenata ‘Helleri’ – Helleri Holly Ilex crenata ‘Green Island’ – Green Island Holly Linnaea borealis – twin Flower * Lupinus arcticus – Arctic Lupine * Lupinus polyphyllus – Large-Leaved Lupine * Mahonia aquifolium ‘Compacta’-Compact Oregongrape * Mahonia nervosa – Long Leaf Mahonia * Oxalis oregano – Redwood Sorrel * Polystichum munitum – Western Sword Fern * Potentilla (var.) – Potentilla varieties Prunus laurocerasus ‘Otto Luyken’ – Otto Luyken Laurel Rosa nutkana – Nootka Rose * Rosa pisocarpa – Cluster Rose * Spirea douglasii – Hardhack * Spirea (var.) – Spirea ‘Mt Vernon’ Symphoricarpos albus – Common Snowberry * trillium ovatum – Western trillium * Vaccinium ovalifolium – Evergreen Huckleberry * Vaccinium membranaceum – Black Huckleberry * Vaccinium parvifolium – Red Huckleberry * Viburnum davidii – David Viburnum Viburnum (var.) – Viburnum varieties Medium/Large: bay vista 39 section IV : ZONING & DEVELOPMENT REGULATIONSAbelia x grandiflora – Glossy Abelia Arbutus unedo (compacta) – Strawberry tree Berberis (var.) – Barberry varieties Ceanothus velutinus – tobacco Brush Cornus sericea – Red Osier Dogwood Enkianthus Euonymus (var.) – Winged Euonymus varieties Holodiscus discolor – Oceanspray * Hydrangea quercifolia – Oakleaf Hydrangea Hydrangea paniculata – Peegee Hydrangea Ilex crenata “Convexa” – Convexleaf Holly Lonicera involucrata – Black twinberry * Mahonia aquifolium – tall Oregongrape * Myrica californica – Pacific Wax Myrtle * Oemleria cerasiformis – Indian Plum * Osmanthus delavayii – Osmanthus Osmanthus heterophyllus – Hollyleaf Osmanthus Osmarea burkwoodi – Burkwood Osmarea Philadelphus lewisii – Mock Orange * Physocarpus capitus – Pacific Ninebark * Prunus lusitanica – Portugese Laurel Ribes sanguineum – Flowering Red Currant * Rhododendron macrophylum or R. albiflorum – Western Rhododendron * Rhododendron (var.) – Rhododendron Rubus parviflorus – thimbleberry * Rubus spectabilis – Salmonberry * Symphocarpus alba – Snowberry taxus baccata – Irish yew Viburnum vars. –Viburnum varieties HEDGES Buxus microphylla ‘Winter Gem’ – Winter Gem Boxwood Buxus sempervirens.- Common Boxwood Buxus suffruticosa – true Dwarf Boxwood Ilex crenata ‘Helleri’ – Helleri Holly Ilex crenata ‘Green Island’ – Green Island Holly Ilex crenata ‘Convexa’ – Convexleaf Holly Laurel Ligustrum japonicum – Japanese Privet Mahonia aquifolium – Oregongrape * Osmanthus heterophyllus – Hollyleaf Osmanthus Prunus laurocerasus ‘Otto Luyken’ Otto Luyken Prunus lusitanica – Portugese Laurel taxus sp. – yew species taxus cuspidata (var.) – yew varieties thuja occidentalis vars. – Arborvitae varieties thuja occidentalis ‘Smaragd’ – Emerald Green Viburnum vars. – Viburnum varieties GROUNDCOVER Arctostaphylos uva-ursi – Kinnikinnick varieties Ceanothus – Wild Lilac Cotoneaster vars. – Cotoneaster varieties Evergreen flowering vines Fragaria vars. – Strawberry varieties Ivy (non-climbing varieties) Juniperus (var.) – Juniper varieties Lawn Grass (Puget Sound turf Grass varieties – sod or seed Mahonia nervosa – Longleaf Mahonia * Mahonia repens – Creeping Mahonia Ornamental grasses thymus – thyme Vinca minor – Periwinkle ACCENt PLANtING Annuals Bulbs Ornamental grasses Perennials 40 November 2012section IV : ZONING & DEVELOPMENT REGULATIONSFigure D-2 Street Sections bay vista 41 section IV : ZONING & DEVELOPMENT REGULATIONSFigure D-2 Street Sections 42 November 2012section IV : ZONING & DEVELOPMENT REGULATIONSFigure D-2 Street Sections bay vista 43 section IV : ZONING & DEVELOPMENT REGULATIONSFigure D-2 Street Sections 44 November 2012section IV : ZONING & DEVELOPMENT REGULATIONSg. utility eQuiPment & storage 1. Utilities shall be installed underground to the greatest extent feasible. Utilities installed above ground shall be screened from view whenever possible. 2. trash storage areas shall be screened from view, animal proof, and easily accessible to service personnel. All trash enclosures shall be screened. 3. Roof and ground- mounted equipment, including HVAC units, shall be screened from view from any public street or open space. Satellite dishes and antennas shall be the smallest possible to receive the signal, shall be placed in the least conspicuous location, and screened and painted to match the colors of the adjacent building as closely as possible. H. walls, Hedges and fenCes 1. Fence height may not exceed six (6) feet. 2. Front yard fences may not exceed four (4) feet in height and shall be an ‘open’ style. these must be set back at least one (1) foot from the back edge of the sidewalk. 3. the maximum combined height for front yard walls with fences is four feet, as measured on the downhill side. 4. Walls or fences on slopes over 15% and visible from the public areas, shall step with the slope in sections at a rate of 1 step per each 12 inches of change in elevation of the adjacent ground, measured parallel to the fence. 5. Fences defining the front edge of courtyards or semi-public open spaces associated with cottage court developments and courtyard buildings shall be as specified for other front yard fences above. Articulation of the entry from the street to such open spaces with decorative gates, trellises and/or arbors is encouraged. 6. Side yard fences attached to the face of the house shall be set back between two feet and five feet from the front face of the house. 7. Side yards setbacks near public areas shall be at least 50% open. Adjacent to any public walkway or other open space shall not be fenced for more than 50% of the length of the building's façade. bay vista 45 section IV : ZONING & DEVELOPMENT REGULATIONSi. exterior ligHting 1. Subtle, low-level lighting of front porches and front yard landscape areas is encouraged. Light pollution shall be minimized by selection of proper fixtures. 2. Lighting shall not spill over beyond property lines or cast glare to surrounding properties. 3. Pole mounted lighting is not permitted inside the property lines of any detached or attached residential structures. Pole mounted pedestrian lighting should be used in the right-of-way. 4. Lighting in garage and utility areas shall not impact neighboring properties or common areas. Motion sensitive wall mounted exterior lights are required on all garage façades facing alleys. 5. Exterior light fixtures should match the architectural style of the building. 6. Lighting for commercial uses shall be appropriately shielded so as to not impact adjacent residential areas or residential units in mixed-use buildings. 7. All street lights should be comprised of ornamental poles and fixtures conforming to the City's “Standards for Work in the ROW”; Cobra heads and shoe box style lighting is prohibited. Preferred lights are 12-14 feet tall. 20 foot tall poles may be utilized at major intersections. 8. Parking lot lighting shall conform to the standards in the Village Commercial zone. 9. Porch lights may be compact-fluorescent or incandescent. j. sign standards Intent: These criteria and standards have been established for the purpose of ensuring that all signage at Bay Vista is designed and constructed in a manner which consistently promotes the following: • Visual harmony between signage and Bay Vista architecture including adjacent materials and colors. • Elegant, yet clear and distinctive identity for each tenant. • Visual enhancement of the pedestrian experience. • Diversity and individuality for each tenant’s signage while maintaining a consistent size and quantity through out Bay Vista. • The use of creativity and high quality materials. • Thoughtful and creative lighting of signage. 1. GENERAL GUIDELINES i. Description: All signs and graphics shall be professionally designed. the lettering and spacing of letters shall be well proportioned to assure legibility as well as a pleasing appearance. Shop drawings for each sign, including colors, dimensions, specifications and proposed construction materials will be required criteria for approval of signage by the Architectural Review Committee. tenant must have written approval by the Architectural Review Committee prior to application for the required city sign permits. ii. Material Preferences: tenant sign design and construction should match the materials used on the exterior of the building. iii. Lighting: Signs may be internally or externally illuminated. Halo or other indirect lighting is encouraged. Exposed neon or bulbs are not allowed. Indirect lighting must be baffled or shielded to reduce blare in the eyes of pedestrians. iv. Standards: Sign standards shall be in accordance with BMC 20.52, with the exceptions and modifications contained in these sign standards. traffic control signs shall conform to the “Manual of Uniform traffic Control Devices.” 46 November 2012section IV : ZONING & DEVELOPMENT REGULATIONS2. SIGNS AND SIGN COMPONENtS NOt PERMIttED i. the following signs and sign components are not permitted: a. Moving, flashing, rotating, noise making or odor producing signs. Electronic message displays are not permitted. b. “Human A-boards” c. Signs taped or glued to interior window. d. The name, stamps or decals of the sign manufacturer cannot be displayed on any portion of the sign. Underwriters Laboratories labels shall be applied in an inconspicuous manner. e. Non-ornamental hardware or electrical components may not be exposed to view. f. Back-lit awnings, including those with signage, are not permitted. 3. SIGNAGE SUBMIttAL AND APPROVAL PROCESS i. Prior to construction of any sign or application for city sign permits, the building owner, tenant or tenant’s sign contractor must obtain the Architectural Review Committee’s written approval of the proposed sign design. the process shall be as follows: a. Tenant to submit completed sign application along with required drawings to Architectural Review Committee. b. Architectural Review Committee to review designs and either approve, approve with corrections, or deny application within 10 days of receipt by Architectural Review Committee. c. If application denied, tenant to review reasons for denial and then change their application and re-submit a new application to Architectural Review Committee. d. Once approval is granted by Architectural Review Committee, tenant may then submit a sign application to the City of Bremerton. ii. Failure to comply with the above process may result in the removal of signage by Architectural Review Committee at tenant’s sole expense, provided Architectural Review Committee will issue notice to tenant/Building Owner of the failure to comply at least 30 days prior to Architectural Review Committee removal to allow tenant/Building Owner time to cure problem and comply. 4. BAy VIStA SIGN CAtEGORIES DEFINED i. Signs or signage requested by a retail tenant or building owner within Bay Vista shall fall into one of the categories listed below. In order to determine the applicable category, read the definitions and standards in these regulations (by type and category). Architectural Review Committee will make final determination in the event of any still un-definable categories. ii. Single Occupant Retail Signage Category: Single Occupant Retail Signage Category defined as signage needed by a retail tenant who occupies a building on a legal lot specific to that building, with no more than one retail establishment utilizing said building. iii. In-line Retail Signage Category: In-line Retail Signage Category, defined as signage needed by retail tenants who occupy a space within the Village which is physically adjacent to, or sharing demising walls with, neighboring tenants. iv. Residential Signage Category: Residential Signage Category defined as signage needed by residential neighborhood, buildings, or group of buildings including multiple residences (for rent or sale) which were built in a coherent manner by a single entity on one or more lots. v. Bay Vista Village Identification & Directional Signage Category: Bay Vista Village Identification & Directional Signage Category defined as Bay Vista Village-specific signage that is intended to identify the overall Bay Vista Village development or facilitate the orientation of pedestrian or automobile traffic throughout the Bay Vista Village to specific tenants or buildings. 5. SINGLE OCCUPANt REtAIL SIGNAGE CAtEGORy: SIGNAGE RULES i. Freestanding Signs: Allowed for parcels that abut Hwy 3 per 20.52.100. Not permitted for all other parcels. Parking lot directional signage allowed and must be solely intended to direct parking lot traffic and may not exceed six square feet, and may not have any business identification or emblems. In some bay vista 47 section IV : ZONING & DEVELOPMENT REGULATIONScases, at Architectural Review Committee’s discretion, Single Occupant Retail tenants may be eligible for identification on certain type “B” and type “C” Bay Vista Village monument signs. a. Building Signs: (i) Internally or externally illuminated building signage allowed. Halo-lit metal signs are encouraged. (ii) One building sign allowed per building elevation visible from street or right of way (public or private) and parking lot. (iii) Cumulative allowed sign areas for each Single Occupant Retail Building within Bay Vista Village shall not exceed 10% of the wall plane area the sign is mounted to. Note: square footage shall be measured by boxing individual letters and symbols, maximum 100 square feet. b. Blade Signs: Blade signs are to be designed and constructed using the following criteria. As with all signs, blade signs must be approved by Architectural Review Committee prior to submitting an application to the city. (i) Size: Blade signs are to be a maximum of 24 inches high x 36 inches wide in size and a minimum of 1 inch thick with a maximum of 2 inches in thickness for the background panel. Raised graphics may be a maximum of .5 inch thick for an overall maximum thickness of three inches. (ii) Quantity: Tenants with one street frontage are allowed one blade sign. Tenants located on a corner are allowed one blade sign per street frontage (public or private). (iii) Custom shapes other than a rectangle or square are encouraged. (iv) Lettering and graphics should be raised/ dimensional. Flat vinyl graphics are heavily discouraged. (v) Blade signs are to be installed on custom metal brackets/hangers. In an attempt to promote individuality for each tenant, there will be no common bracket for blade signs. Tenants are encouraged to be creative in their design and fabrication of this element. (vi) The minimum clearance for blade signs is 8 feet from grade to bottom of sign. (vii) Placement of blade sign in most cases should be directly over the primary entrance to the Tenant space or centered along tenant frontage, if two or more tenants share an entrance. (viii) Blade sign material shall be a high quality material such as wood, metal or glass. Architectural Review Committee will be the sole judge as to the acceptability of materials and designs. (ix) Illumination. Lighting of the Tenant’s blade sign is allowed. The Architectural Review Committee shall approve the lighting design before installation of such lighting. Electricity for spotlighting must come from Tenant’s space and the lighting must be installed by a licensed electrical contractor. External lighting must be baffled or shielded to reduce glare in the eyes of pedestrians. c. Window Lettering: Window lettering must meet the following criteria: (i) All lettering is to be professionally painted or applied vinyl directly on the inside of the storefront glass door. (ii) The logo and name of the store may be represented by letters up to a maximum height of 6 inches. (iii) Store hours on the entry door are encouraged. (iv) If Tenant has a non-customer door for receiving merchandise, the Tenant’s name and address, number only, may be applied on the door. The letter height is to be 2 inches high, Helvetica Light font made of white vinyl applied at 5-feet, 6-inches above bottom edge of door. Where more than one tenant uses the same door, each name and address shall be applied. 6. IN-LINE REtAIL SIGNAGE CAtEGORy: SIGNAGE RULES i. Freestanding Signs: Not permitted. ii. Building Signs a. Internally or externally illuminated building signage allowed. Halo-lit metal signs are encouraged. b. One building sign allowed per Tenant visible from street or right of way (public or private) and parking lot. c. When calculating allowed area of building signage for in-line retailers the following criteria apply: (i) Width of sign may be no more than two thirds the width of the elevation to the Tenant space to which sign will be attached. (ii) The maximum letter height shall be 18 inches, and logos or emblems may be no larger than 30 inches in height. If two lines of copy are used, the combined height of both rows may be no larger 48 November 2012section IV : ZONING & DEVELOPMENT REGULATIONSthan 28 inches. (iii) Cumulative allowed sign areas for each in-line retail tenant within Bay Vista Village are as follows: 8% of wall plane the sign is mounted to, not to exceed 50 square feet. Note: Square footage measured by boxing individual letters and symbols. iii. Blade Signs: Blade signs will be required for Bay Vista Village In-line Retail tenants. Blade signs are to be designed and constructed using the following criteria. As with all signs, blade signs must be approved by Architectural Review Committee prior to submitting an application to the city. a. Size: Blade signs are to be a maximum of 24 inches high x 42 inches wide in size and a minimum of 1 inch thick with a maximum of 2 inches in thickness for the background panel. Raised graphics may be a maximum of .5 inch thick for an overall maximum thickness of 3 inches. b. Quantity: Tenants with one street or plaza frontage are allowed one blade sign. Tenants located on a corner are allowed one blade sign per street or plaza frontage (public or private). c. Custom shapes other than rectangle or square are encouraged. d. Lettering and graphics should be raised/dimensional. Flat vinyl graphics are discouraged. e. Blade signs are to be installed on custom metal brackets/hangers. In an attempt to promote individuality for each tenant, there will be no common bracket for blade signs. Tenants are encouraged to be creative in their design and fabrication of this element. f. The minimum clearance for blade signs is 8 feet from grade to bottom of sign. g. Placement of blade sign in most cases shall be directly over the primary entrance to the Tenant space or centered along tenant frontage if two or more tenants share an entrance. h. Blade sign material shall be a high quality material such as wood, metal or glass. Architectural Review Committee will be sole judge as to the acceptability of materials and designs. i. Illumination. Lighting of the Tenant’s blade sign is allowed. The Architectural Review Committee shall approve the lighting design before installation of such lighting. Electricity for spotlighting must come from Tenant’s space and the lighting must be installed by a licensed electrical contractor. External lighting must be baffled or shielded to reduce glare in the eyes of pedestrians. iv. Window Lettering a. All lettering is to be professionally painted or applied vinyl directly on the inside of the storefront glass door. Gold or silver leaf is encouraged. b. The logo and name of the store may be represented by letters up to a maximum height of 3 inches. c. Store hours on the entry door are encouraged. The store hours lettering may not exceed 9 inches high x 12 inches wide. d. If Tenant has a non-customer door for receiving merchandise, the Tenant’s name and address, number only, may be applied on the door. The letter height is to be 2 inches high, Helvetica Light font made of white vinyl applied at 5 feet, 6 inches above bottom edge of door. Where more than one tenant uses the same door, each name and address shall be applied. 7. RESIDENtIAL SIGNAGE CAtEGORy: SIGNAGE RULES i. Freestanding Signs: One freestanding neighborhood identification sign is permitted at each entrance to a residential neighborhood or as allowed by BMC 20.52. Halo or indirect illumination is allowed. Parking lot directional signage allowed and must be solely intended to direct parking lot traffic. ii. Building Signs: the following rules for residential building signs apply: (Note: Square footage shall be measured by boxing individual letters and symbols.) a. Building signs may be substituted for freestanding signs. b. Halo or indirect illumination is allowed. iii. Size a. Standard allowance to be 20 square feet per sign. bay vista 49 section IV : ZONING & DEVELOPMENT REGULATIONSb. 30 square feet per sign: to be allowed if the following materials are used: brass, copper, chrome, brushed or polished aluminum, stainless steel, etched glass, stone, gold or silver leaf, porcelain and hardwoods. iv. Blade Signs: Blade signs are allowed at residential amenity space entryways or leasing and sales offices. Blade signs are to be designed and constructed using the following criteria. As with all signs, blade signs must be approved by Architectural Review Committee prior to construction. a. Size: Blade signs may be a maximum of 24 inches high x 36 inches wide in size and a minimum of 1 inch thick with a maximum of 2 inches in thickness for the background panel. Raised graphics may be a maximum of .5 inch thick for an overall maximum thickness of 3 inches. b. Quantity: Tenants with one street frontage are allowed one blade sign. Tenants located on a corner are allowed one blade sign per street frontage (public or private). c. Custom shapes other than rectangle or square are encouraged. d. Lettering and graphics should be raised/dimensional. Flat vinyl graphics are heavily discouraged. e. Blade signs are to be installed on custom metal brackets/hangers. In an attempt to promote individuality for each tenant, there shall be no common bracket for blade signs. Tenants are encouraged to be creative in their design and fabrication of this element. f. The minimum clearance for blade signs is 8 feet from grade to bottom of sign. g. Placement of blade sign in most cases shall be directly over the primary entrance to the Tenant space or centered along tenant frontage if two or more tenants share an entrance. h. Blade sign material shall be a high quality material such as wood, metal or glass. Architectural Review Committee will be sole judge as to the acceptability of materials and designs.i. Illumination. Lighting of the Tenant’s blade sign is allowed. The Architectural Review Committee shall approve the lighting design before installation of such lighting. Electricity for spotlighting must come from Tenant’s space and the lighting must be installed by a licensed electrical contractor. External lighting must be baffled or shielded to reduce glare in the eyes of pedestrians. v. Window Lettering a. All lettering is to be professionally painted or applied vinyl directly on the inside of the storefront glass door. Gold or silver leaf is encouraged. b. The logo and name of the store may be represented by letters up to a maximum height of 3 inches. c. Store hours on the entry door are encouraged. The store hours lettering may not exceed 9 inches high x 12 inches wide. d. If Tenant has a non-customer door for receiving merchandise, the Tenant’s name and address, number only, may be applied on the door. The letter height is to be 2” high, Helvetica Light font made of white vinyl applied at 5 feet, 6 inches above bottom edge of door. Where more than one tenant uses the same door, each name and address shall be applied. 8. BAy VIStA VILLAGE IDENtIFICAtION AND DIRECtIONAL SIGNAGE i. Primary Bay Vista Village Identification Monument Signs: Bay Vista Village may have up to three primary identification freestanding monument signs (entrance and portal) and may share one primary identification freestanding monument sign (portal) with the residential community. Maximum size shall be 100 square feet. ii. Secondary Identification Monument Signs: Bay Vista Village may have up to four Secondary Identification Monument Signs, one per building. Maximum size shall be forty square feet. iii. Directional tenant/Building Owner Signs: Bay Vista Village may have freestanding and/or wall directional signs as needed to help pedestrian and automobile traffic locate various retail tenants and building owners within the Village. the style of these signs is to be consistent with primary and secondary monument signs. Maximum size shall be six square feet. 50 November 2012section IV : ZONING & DEVELOPMENT REGULATIONSk. glossary Definition of terms shall be in accordance with the definitions of the BMC with the following additions and/or revisions. ARCADE – A colonnade with arched openings. BLADE SIGNAGE – A vertically oriented sign hung from, and perpendicular to, a facade so that it may be read by pedestrians on the sidewalk. BLOCK – A unit of land bounded by streets on all sides. BUILDING HEIGHt – The distance from the average finish grade at the façade to the highest point of a flat roof, or midpoint of the slope on a pitched roof. CHEEKWALL – The side wall of a flight of stairs or steps. COLONNAdE – A covered passage way supported by column, and lintels open to the street with rectangular openings. COURtyARD – A courtyard is a space defined by a single building or multiple buildings on at least two sides, and a fence or building or other well-defined edge on all other sides. DOOR-yARD – The area between the setback and the public sidewalk. Planting, porches, lead walks, stoops and fence occurs within this area. FOOtPRINt – The footprint is an outline showing the extent to which a home, building, or other architectural element covers the lot on the ground level. FRONtAGE OCCUPANCy – The minimum amount of primary façade that must be built along a setback. FURNISHING ZONE – A continuous zone extending the entire length of commercial and mixed-use streets parallel to the street and delineated from the back of curb, having a consistent width that is identified for the placement of permanent elements such as street trees, tree pits, tree grates, street lights, trash cans and benches. Moveable tables and chairs are not prohibited from this zone. GARDEN WALL – A wall that separates a courtyard, front yard, or service area from the street in order to screen private activities from the public realm. Garden Walls are independent walls over four (4) feet high. LEAD WALK – Pavement that is intended for pedestrian travel to and from a building entryway, courtyard and the sidewalk. LIVE-WORK – A live-work building/unit is one in which the bottom floor is designed for commercial uses and the space above is designed for, and occupied by, residential uses. It is also designed such that the attached residential unit could have direct access to the commercial space if the residential occupant were also the commercial tenant or commercial business owner, but can be secured (prohibiting access from the above residential unit to the commercial space below) if resident is not the commercial tenant or commercial business owner. LOGGIA – Similar to a porch, a loggia is a covered exterior space, but one that is set inside or recessed into a facade (as opposed to a porch which protrudes or extends beyond the facade of a building. MIxED-USE BUILDING – A building with two or more uses having a different use on the ground floor (e.g., retail on the ground floor and residential above). OPEN SPACE – An area that is intended to provide light, air, and/or views or general appearance of openness, and is designed for scenic, recreational, private, or environmental purposes. PAIRED FACADES – Two facades next to each other, sitting in front of an open space composed with the same or a complimentary architectural design and character. RESIDENtIAL MIxED-USE BUILDING – A mixed-use building that requires residential use on the second and higher floors. PORCH – A porch is a covered, platform raised above the surrounding ground providing a transition from the public to private realms and entry into usually a single dwelling unit but, on occasion, multiple dwelling units. bay vista 51 section IV : ZONING & DEVELOPMENT REGULATIONSPRIMARy FACADE – All elevations (Front and Side ) that are parallel to, or are clearly visible from a street. SCREENING – A natural or constructed barrier consisting of any landscaping, fencing, or other barrier intended to block a view. SECONDARy FAÇADE – All elevations that are not defined as a primary façade. SEt PIECE FAÇADE – A primary facade in a prominent location that should be designed as a focal element with a greater amount of detail than the surrounding buildings. StOOP – A raised, covered or non-covered, projecting stairway that connects a building's porch or entryway to the ground usually at the front yard a building. StREEt FRONtAGE – The building or house facade running parallel to a public street or private street. StREEt WALL & FENCE – The street wall, or street face, is the visual three-dimensional wall that is formed by, and composed of, the primary facades located along the build-to line. tHRESHOLD – A passageway enclosed by buildings on both sides and above by building or other architectural elements, that one moves through to enter a space or street. tOWER ELEMENtS – An integrated, architectural element that extends above the roof line that may be used for signage/advertisement per approval of the Bay Vista Architectural Review Committee. VISItABLE DWELLING UNIt & VISItABLE ENtRIES – A visitable dwelling unit includes at least one zero-step entry, located at either the front or back of a unit, with a minimum 3-foot wide entry door and includes, among other things, 3-foot passage doors throughout the ground floor of the entire unit. A visitable entry is a zero-step entry to a dwelling unit. 52 November 2012section IV : ZONING & DEVELOPMENT REGULATIONSl. design intent The intent of the Bremerton Housing Authority’s Master Plan for the Bay Vista site is to have the community follow the principles of traditional neighborhood design. Early in the last century, communities were much more pedestrian-friendly and socially connected. In a traditional neighborhood, one will see residential and commercial uses mixed, or in close proximity to each other. Newer communities, however, have segregated these uses, requiring residents to use their automobiles to do anything outside of their homes. The goal at Bay Vista is to encourage resident interaction by making the streets and buildings as pedestrian-oriented as possible, and to provide mixed uses that allow residents to walk down the street to purchase some basic needs, rather than leaving the community and driving to a retail destination for every need. The look and feel of the community should enhance the pedestrian experience, and the design concept of a varied and interesting village that has evolved and built up over time is a design objective. Large buildings should be designed such that their facades have the appearance of several smaller buildings, using varied colors and materials and modulation, to reduce their apparent scale. Houses and individual townhouse units should be designed to appear as unique buildings grouped together, rather than repetitions of the same façade. Commercial and retail buildings should enhance the window shopping experience, and create a sense of liveliness and quality through the use of varying materials, colors, signage and awnings. Commercial streets should contribute to this effect with enhanced paving materials and the use of street trees, street furnishings and pedestrian-scaled lighting. Commercial and mixed-use buildings should have a timeless character, and a northwestern look and feel. This section will work in tandem with Section IV Zoning and Development Standards. The Design Standards are not City regulations, but will be adopted as Covenants, Conditions, & restrictions (CC&R's) applicable to all property within Bay Vista. The Bay Vista Architectural Review Committee (ARC) will be responsible for their enforcement. The ARC will review all building and related applications before they are submitted to the City to ensure compliance with these standards (details are available through the Architectural Review Committee). 1 2012 Comp Plan Amendment ORDINANCE NO. ____ AN ORDINANCE of the City Council of the City of Bremerton, Washington, amending the Comprehensive Plan by amending the Downtown Regional Center Subarea Plan to include three parcels located at the corner of Burwell Street and Warren Avenue in the Downtown Regional Center Subarea Plan boundaries; and by amending the Bay Vista Subarea Plan. WHEREAS, the City of Bremerton adopted a Comprehensive Plan on December 1, 2004 by Ordinance No. 4917 and has been subsequently amended by Ordinances No.; 4954, 4962, 4985, 4998, 5025, 5034, 5037, 5062, 5077, 5082 and 5094 hereinafter referred to as the “Comprehensive Plan”; and WHEREAS, the Washington State Growth Management Act ("GMA") requires internal consistency among comprehensive plan elements and applicable regional plans; and WHEREAS, to assure that comprehensive plans remain relevant and up to date, the GMA requires each jurisdiction to establish procedures whereby amendments to the plan are considered by the City Council (RCW 36.70A.130(2)), and limits these amendments to once each year unless an emergency exists; and WHEREAS, the City of Bremerton has established a procedure for amending the Comprehensive Plan in Title 20.10.010 of the Bremerton Municipal Code (BMC), that limits amendments to the Comprehensive Plan to no more than once each year; and WHEREAS, the City of Bremerton allows applications to be submitted each year between January and the first business day of April; and WHEREAS, two Comprehensive Plan amendment applications were submitted by the public prior to the deadline to address changing circumstances relative to land use needs; and WHEREAS, the Planning Commission conducted workshops on the 2012 amendment docket on July 17, 2012 and September 18, 2012; and WHEREAS, consistent with RCW 36.70A.106 the 60-day notice period began on September 5, 2012 when the Washington State Department of Commerce received notification of the Comprehensive Plan Amendment docket for 2012; and WHEREAS, on September 29, 2012 the public was notified by a legal advertisement in the Kitsap Sun of the opportunity to make comment and participate in the public hearing held by the Planning Commission; and WHEREAS, on September 20, 2012 a SEPA DNS was issued for amendment Docket Item 1, relating to the Downtown Regional Center Subarea Plan, with an administrative 2 2012 Comp Plan Amendment appeal deadline of October 4, 2012 and no appeals were filed; and WHEREAS, SEPA was satisfied on September 26, 2012 for Docket Item 2, relating to the Bay Vista Subarea Plan, by the adoption of existing environmental documentation of the Bay Vista EIS in May 2007 and SEIS in January 2008; and WHEREAS, on October 9, 2012 the Planning Commission conducted a public hearing on the 2012 Comprehensive Plan Amendment Docket, and the Planning Commission recommended the City Council approve the amendments; and WHEREAS, on December 1, 2012 the public was notified by a legal advertisement in the Kitsap Sun of the opportunity to make comment and participate in the public hearing held by the City Council; and WHEREAS, on December 19, 2012 the City Council conducted a public hearing and considered all testimony prior to their decision; and WHEREAS, the amendment proposals satisfy the decision criteria of BMC 20.10.080 for Comprehensive Plan amendments; and WHEREAS, the proposal meets requirements of the Washington State Growth Management Act (GMA); and WHEREAS, the proposal is consistent with Kitsap County Countywide Planning Policies (KCCPP). NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. The findings set forth in the recitals above area hereby adopted and incorporated herein. SECTION 2. The findings and conclusions adopted by the Planning Commission on October 9, 2012 and attached hereto as Exhibit A are adopted and incorporated as if set forth fully herein. SECTION 3. The City of Bremerton Comprehensive Plan is hereby amended by approving and adopting the proposed 2012 Comprehensive Plan amendments set forth in docket items 1 through 2 as follows: Docket Items: 1. Burwell and Warren Avenue Parcels: Amend the Downtown Regional Center Subarea Plan to include three parcels located at the corner of Burwell Street and Warren Avenue in the Downtown Regional Center boundaries and given a land use designation of Warren Avenue Corridor (WC), more particularly described in 3 2012 Comp Plan Amendment Exhibit B affixed hereto. 2. Bay Vista Subarea Plan: Amend the Bay Vista Subarea Plan summarized as follows: reallocation of Village Commercial and multi-family locations; revise permitted land uses to reflect land use zones that are being condensed; revise complex Code requirements in Subarea Plan to more resemble the City of Bremerton Zoning Code; and alter landscaping, signage and parking requirements which will still comply with overall policies and goals of the existing Bay Vista Subarea Plan, and more particularly described in Exhibit C affixed hereto. SECTION 4. Severability. If any provision of this ordinance is held invalid or unconstitutional, such invalidity or unconstitutionality shall not affect the validity or constitutionality of the remainder of this ordinance. Provided however, that if any provision of this ordinance is held invalid or unconstitutional, then the provision in effect prior to the effective date of this ordinance shall be in full force and effect for that individual provision as if this ordinance had never been adopted. SECTION 5. Effective Date. This Ordinance shall take effect and be in force ten (10) days from and after its passage, approval, and publication as provided by law. PASSED by the City Council the___________ day of ____________________, 2012 _________________________________ JIM MCDONALD, Council President Approved this ________ day of ________________________, 2012 _________________________________ PATTY LENT, Mayor ATTEST: APPROVED AS TO FORM: __________________________________ ________________________________ SHANNON CORIN, City Clerk ROGER A. LUBOVICH, City Attorney 4 2012 Comp Plan Amendment PUBLISHED the________ day of ______________________, 2012 EFFECTIVE the_________day of ______________________, 2012 ORDINANCE NO. ____________ AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Amendment to Interlocal Agreement Regarding Emergency Communications and Other Services Study Session Date: 12-12-12 COUNCIL MEETING Date: 12-19-12 Department: Fire & Police Presenter: Chiefs Duke & Rogers Phone: 473-5380 SUMMARY: The CenCom Policy Board proposes to amend the Interlocal Agreement to allow the Board to determine the funding formula and not have to change the Interlocal Agreement every time. The Mayor, Councilmembers Arends and Wheeler are the members from the City of Bremerton that sit on the thirteen member board. The second change would be if an entity chooses to terminate the agreement, the entity would have to give a 180-day written notice; the agreement now is for 90-day period. ATTACHMENTS: Amendment to Interlocal Agreement Regarding Emergency Communications and Other Services Form Updated 11/02/12 COUNCIL ACTION: Approve Deny Table Continue No Action RECOMMENDED MOTION: Move to approve the Amendment to Interlocal Agreement Regarding Emergency Communications and Other Services and authorize the Mayor to finalize and execute the Amendment with substantially the same terms and conditions as presented. STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing STUDY SESSION AGENDA: ☐ No Discussion ☐ Full Presentation FISCAL IMPACTS (Include Budgeted Amount): None AMENDMENT TO INTERLOCAL AGREEMENT REGARDING EMERGENCY COMMUNICATIONS AND OTHER SERVICES This Amendment (this “Amendment”) to Interlocal Agreement Regarding Emergency Communications and Other Services (the “Agreement”) is entered into between Kitsap Count y (the “County”) and the below-named recipient (the “Recipient”). RECITAL WHEREAS, the parties entered into the Agreement and now wish to amend it as provided herein; NOW, THEREFORE, THE PARTIES AGREE AS FOLLOWS: AGREEMENT 1. Definitions. The body of Title I(A), (J) and (K) – Definitions and Functions are modified as follows: A. Allocable proportion: The amount of money chargeable of Recipient as its share of maintenance, operations, and insurance expenses for the emergency communications system. The allocable proportion is determined by one of the formula as adopted by the CENCOM Policy Board in Appendixes A or B to this agreement. . . . . J. Criminal Justice Data Communications System- ACCESS: CENCOM is connected to the Washington State Patrol ACCESS system for criminal history information. Inasmuch as the involvement of the commissioned law enforcement authorities is required in the management control of this system, the Sheriff and appointed Chiefs of respective agencies are designated the CENCOM ACCESS Board as outlined in Appendix A“C”. . . . . . K. Organizational Chart: The Organizational Chart is included as part of this Agreement and identified as Appendix B“D”. 2 2. Payments. The body of Title III is modified as follows: For emergency communications services for each calendar year subsequent to the dates of this agreement, Recipient agrees to pay to County its allocable proportion in twelve (12) equal monthly installments. The allocable proportion for each calendar year due from Recipient is computed in accordance with the formula adopted by the CENCOM Policy Board. as follows: A. Fire District: Allocable proportion shall be computed as shown in Appendix A; B. County, a City, or Indian Tribe: Allocable proportion shall be computed as shown in Appendix B. C. Other Agency: Allocable proportion shall be determined by the Board. 3. Amendment. The body of Title VII – Amendment of the Agreement is modified as follows: It is specifically agreed by and between the parties hereto that this Interlocal Agreement may be amended by the Board at any duly called regular or special meeting of the Board, but only after first giving thirty (30) days written notice of such meeting and proposed amendment to all parties to this agreement. However, nothing in this paragraph shall be construed to authorize any change in the funding formula set forth in this agreement nor to authorize any act which would cause an increase, or change the amount paid by any participating agency beyond the amount determined by the Board pursuant to this agreement. 4. Termination. The body of Title X – Termination of the Agreement is modified as follows: Either party to this Interlocal Agreement may terminate it by providing written notice of such to the other at least ninety (90) one-hundred and eighty (180) days prior to the specified termination date.; Provided, this Interlocal Agreement can only be terminated at the end of a calendar year 5. Merger. The body of Title XI – Merger is modified as follows: This Interlocal Agreement, including its appendicesconsisting of sixteen (16) pages (including Appendixes A, B, and C and D), merges and supersedes all prior negotiations, representations and oral or written agreements between the parties hereto relating to subject matter hereof and constitutes the entire Interlocal Agreement between the parties. 3 6. Appendix A. Appendix A is removed. 7. Appendix B. Appendix B of the Agreement is removed. 8. Appendix C. Appendix C of the Agreement is re-designated as Appendix A, but is otherwise unchanged. 9. Appendix D. Appendix D of the Agreement is re-designated as Appendix B, but is otherwise unchanged. 10. Scope of Amendment. Except as modified, the Agreement remains in effect. 11. Effective Date. This Amendment shall be effective as of ____________________. // // // // // // // // // // // // // // // // 4 IN WITNESS WHEREOF, the parties have subscribed their names to this Amendment and warrant that they have the full authority to enter into it. KITSAP COUNTY BOARD OF COMMISSIONERS KITSAP COUNTY, WASHINGTON Robert Gelder, Chair Josh Brown, Commissioner Charlotte Garrido, Commissioner ATTEST: Dana Daniels, Clerk of the Board Date RECIPIENT By: Signature Printed Name: Title: ATTEST: By: Signature Printed Name: Title: Date 5 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Ordinance No. ____ amending Ordinance No. 5173 establishing the City of Bremerton’s Fiscal Year 2012 budget as amended by Ordinance No. 5186. Study Session Date: December 12, 2012 COUNCIL MEETING Date: December 19, 2012 Department: Finance Presenter: Becky Hasart Phone: 360-473-5722 SUMMARY: The Bremerton City Council adopted the 2012 Annual City Budget by Ordinance 5173 on December 14, 2011 and later amended the budget by Ordinance 5186 on June 6, 2012. Subsequently, certain actions have been taken and conditions have changed which have an impact on the final 2012 Annual Budget, resulting in the need for this amendment. ATTACHMENTS: Ordinance No. _____ amending the 2012 Fiscal Year Budget Final 2012 Budget Amendment memo FISCAL IMPACTS (Include Budgeted Amount): Overall 2012 budget will be $147,318,714 STUDY SESSION AGENDA: ☐ No Discussion ☒ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☒ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve Ordinance No. ____ of the City Council of the City of Bremerton, Washington, amending Ordinance No. 5173 establishing the City of Bremerton’s Fiscal Year 2012 budget as amended by Ordinance No. 5186. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 11/02/12 1 2012 Final Budget Adjustment ORDINANCE NO. _____ AN ORDINANCE of the City Council of the City of Bremerton, Washington, amending Ordinance No. 5173 establishing the City of Bremerton’s Fiscal Year 2012 budget as amended by Ordinance No. 5186. WHEREAS, the City Council passed the Fiscal Year 2012 City Budget Ordinance (Ordinance No. 5173) on December 14, 2011; and WHEREAS, the City Council subsequently amended the Fiscal Year 2012 City Budget (Ordinance No. 5186) on June 6, 2012 to provide for certain programs and actions taken up to that point requiring amendment to the 2012 budget; and WHEREAS, the City Council has previously amended the budget by various motions and resolutions subsequent to June 6, 2012 which require a formal amendment by ordinance; and WHEREAS, several City Departments and Funds are experiencing or anticipate additional expenses due to factors such as costs related to provision of contracted services, changed allocations of staff time, and the reallocation of prior period expenditures; and WHEREAS, several City Departments and Funds require adjustment to revenues to reflect activity in 2012 or timing changes from that which was anticipated in the 2012 budget; and WHEREAS, certain reclassifications of revenues and expenditures are required to properly reflect budget categories in a manner consistent with actuals as classified in accordance with Generally Accepted Accounting Principles; and WHEREAS, each of these actions has an impact on the City of Bremerton’s FY 2012 Annual Budget resulting in the need to amend this Budget document; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. Ordinance No. 5173 establishing the City of Bremerton’s 2012 Budget as amended by Ordinance No. 5186 is hereby amended as follows: 2 2012 Final Budget Adjustment 2012 Budget Final as Amended by 2012 Year-End Fund No.Ord No. 5186 Net Adjustments Budget 001 General Fund City Council 332,770$ -$ 332,770$ Executive 370,360 - 370,360 Financial Services 1,153,840 - 1,153,840 Legal 981,650 - 981,650 Human Resources 398,010 - 398,010 Community Development 1,408,536 - 1,408,536 Municipal Court 1,294,187 - 1,294,187 City Auditor 170,960 - 170,960 Law Enforcement 9,598,837 - 9,598,837 Fire/Emergency Services 8,413,452 - 8,413,452 Police/Fire Pension 2,544,000 - 2,544,000 General Facilities 807,117 163,000 970,117 Parks & Recreation 2,608,741 - 2,608,741 Engineering 2,137,328 - 2,137,328 Non-Department 3,677,811 106,000 3,783,811 Ending Fund Balance 2,793,467 (269,000) 2,524,467 Total General Fund 38,691,066$ -$ 38,691,066$ 101 Arterial Street 4,833,028 - 4,833,028 102 Street 2,484,029 65,000 2,549,029 103 Contingency Reserve 232,092 - 232,092 104 Lodging Tax 481,862 - 481,862 105 Parking System 1,430,814 - 1,430,814 106 Community Dev. Block Grant 2,900,531 - 2,900,531 108 Abatement Revolving 239,413 - 239,413 110 Police Special Projects 1,076,838 - 1,076,838 113 Public Access Television 457,708 - 457,708 114 Gift & Donation Fund 93,106 - 93,106 116 Trial Improvement 61,301 - 61,301 117 One Percent For Arts 51,670 - 51,670 120 Conference Center Operating 1,848,861 - 1,848,861 201 Bond Fund 729,792 - 729,792 203 2010 LTGO 704,763 - 704,763 204 2010 UTGO/LTGO (B)565,734 - 565,734 205 Government Center LTGO - 5,634,051 5,634,051 304 Harborside Plaza & Commons 34,336 60 34,396 305 Park Plaza Construction 351,648 - 351,648 306 Park Plaza Phase II 4,109,586 60 4,109,646 308 General Gov't Capital Improvement 542,522 - 542,522 310 Park Facilities Construction 1,754,369 - 1,754,369 311 Evergreen Park Remediation 80,081 - 80,081 331 Lower Wheaton Way 1,712,055 - 1,712,055 401 Water Utility 14,627,749 - 14,627,749 404 Water Capital 4,946,417 - 4,946,417 407 Golf Mountain Golf 2,413,539 - 2,413,539 451 Wastewater Utility 22,995,178 - 22,995,178 454 Wastewater Capital 9,662,189 - 9,662,189 481 Stormwater Utility 5,072,551 - 5,072,551 482 Gorst Creek Watershed 483,498 - 483,498 484 Stormwater Capital 3,081,029 - 3,081,029 503 Risk Management 3,223,483 - 3,223,483 506 Employment Security 271,954 - 271,954 507 Accumulated Leave Liability 256,906 - 256,906 509 ER&R - Operations & Maintenance 1,813,631 - 1,813,631 510 ER&R - Reserves 6,165,120 - 6,165,120 511 Information Services 1,139,094 - 1,139,094 Total All funds 141,619,543$ 5,699,171$ 147,318,714$ 3 2012 Final Budget Adjustment SECTION 2. That the totals for the funds noted in Section 1 above are hereby appropriated for the fiscal year 2012. SECTION 3. Severability. If any one or more sections, subsections, or sentences of this Ordinance are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Ordinance and the same shall remain in full force and effect. SECTION 4. Effective Date. This ordinance shall take effect and be in force ten (10) days from and after its passage, approval and publication as provided by law. PASSED by the City Council the___________ day of ____________________, 2012 _________________________________ JIM McDONALD, Council President Approved this ________ day of ________________________, 2012 ________________________________ PATTY LENT, Mayor ATTEST: APPROVED AS TO FORM: __________________________________ ________________________________ SHANNON CORIN, City Clerk ROGER A. LUBOVICH, City Attorney PUBLISHED the________ day of ______________________, 2012 EFFECTIVE the_________day of ______________________, 2012 ORDINANCE NO. ______ Memorandum To: City Council Mayor Patty Lent From: Caroline Tompson, Budget Analyst Re: Final 2012 Budget Amendments Date: December 12, 2012 The City adopted the 2012 budget by Ordinance No. 5173 on December 14, 2011 which was later amended by Ordinance No. 5186 on June 6, 2012. In preparation for wrapping up 2012, it is necessary to do one last amendment to the budget to incorporate Council actions that have occurred since the m id-year budget amendment as well as to correct other items that have come to the attention of the staff in Financial Services. Enclosed is the final budget amendment ordinance and supporting schedules. The adjustments identified are as follows:  Formally adopt and incorporate 2012 budget changes approved by council subsequent to the mid-year budget amendment.  Reclassify expenditure categories as needed to properly reflect the actuals as classified in accordance with Generally Accepted Accounting Principles.  Reallocate $15,000 in Finance from personnel to supplies and services for temp agency professional services. Zero net budget increase.  Increase care and custody expenditures in the amount of $106,000 for medical costs and additional jail days in Non-Departmental.  Reallocate $30,000 in Court personnel to supplies and services for additional public defender, jury trial, and court security costs. Zero net budget increase.  Reallocate $10,410 in Police supplies and services budget to capital for forensic equipment that exceeded the capitalization threshold. Zero net budget increase. 2  Reallocate $60,000 in Fire supplies and services to personnel for additional overtime. Zero net budget increase.  Increase General Facilities personnel for maintenance labor in excess of estimates, $63,000.  Account for previously approved capital in General Facilities for emergency generator at Fire Station #1, $100,000.  Reallocate personnel in Parks to capital for work performed on Parks Construction projects, $27,400. Labor is paid under charges for services in Parks revenue. Zero net budget increase.  Increase capital and debt service in Parks Capital Construction Fund for 2012 pool lighting upgrades, $42,500 and 2011 drain (safety) upgrades, $14,100.  Increase capital, and charges for services under revenue, in Street Fund for signal cabinet upgrades associated with Crosstown Pipeline Project, $65,000.  Increase debt service in Fund 204 for additional fiscal agent fees associated with BABS Subsidy calculation, $330.  Account for revenue, $5,634,051 and expenditures, $5,630,398 due to previously approved Government Center debt refinancing in Government Center LTGO Fund 205.  Increase transfer-out from Fund 304 to Fund 306 for closing out fund, $60.  Increase debt service in Golf to account for short-term interfund loan interest to ER&R for previously approved capital equipment purchases, $500.  Increase debt service for principal and interest on intergovernmental loans in the Water Utility, $12,425, and Wastewater Utility, $14,500.  Account for additional claim expenses in the Risk Management Fund, $30,000. The budget adjustments are necessary to properly reflect the nature and extent of revenues and expenditures of the various City funds and department s. CITY OF BREMERTON 2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE GENERAL FUND For the Year Ended December 31, 2012 Amended Proposed Adj Required Mid-Year Year-End From The Budget Budget Amended Budget 2012 2012 2012 REVENUES Taxes Property $7,738,000 $7,738,000 $- Sales 6,250,000 6,250,000 - Other 7,980,900 7,980,900 - Licenses and Permits 917,625 917,625 - Intergovernmental 1,222,786 1,222,786 - Charges for Services 5,284,900 5,284,900 - Fines and Forfeitures 1,133,730 1,133,730 - Miscellaneous 387,530 387,530 - Transfers In & Other Financing 4,665,829 4,665,829 - Total Revenues 35,581,300 35,581,300 - EXPENDITURES Personnel Expenses 26,585,400 26,636,500 51,100 Supplies, Services, and Taxes 7,897,852 7,977,942 80,090 Capital Expenditures 163,042 300,852 137,810 Debt Service 411,305 411,305 - Transfers Out 840,000 840,000 - Total Expenditures 35,897,599 36,166,599 269,000 CHANGES IN FUND BALANCE Net change in fund balances (316,299) (585,299) (269,000) Fund Balances-beginning 3,109,766 3,109,766 - Fund Balances-ending $2,793,467 $2,524,467 $(269,000) GENERAL FUND EXPENDITURES BY DEPARTMENT City Council $332,770 332,770 $- Executive 370,360 370,360 - Financial Services 1,153,840 1,153,840 - Legal Department 981,650 981,650 - Human Resources 398,010 398,010 - Community Development 1,408,536 1,408,536 - Municipal Court 1,294,187 1,294,187 - City Auditor 170,960 170,960 - Police Department 9,598,837 9,598,837 - Fire Department 8,413,452 8,413,452 - Police & Fire Pension 2,544,000 2,544,000 - General Facilities 807,117 970,117 163,000 Parks & Recreation 2,608,741 2,608,741 - Engineering 2,137,328 2,137,328 - Non-Departmental 3,677,811 3,783,811 106,000 Total Expenditures $35,897,599 $36,166,599 $269,000 The target ending fund balance is 8.5% of annual expenditures excluding capital. The target fund balance for the 2012 budget as amended is $3,048,589. The actual ending fund balance after the proposed amendments is $2,524,467 which is lower than the target amount by $524,122. The financial planning goal is to bring the ending fund balance level back up to where it meets or exceeds the target level. FUND 001 CITY OF BREMERTON 2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE GENERAL FUND For the Year Ended December 31, 2012 Budget Adjustments: Expenditure - increase capital for Fire Station #1 emergency generator (100,000) Expenditure - decrease supplies in Police and reallocate to capital - forensic equipment purchase 10,410 Expenditure - increase capital in Police reallocated from supplies - forensic equipment purchase (10,410) Expenditure - decrease personnel in Court & reallocate to supplies - public defense, jury trials and security 30,000 Expenditure - increase supplies in Court reallocated from personnel - public defense, jury trials & security (30,000) Expenditure - increase supplies & services in Non-dep for additional prisoner jail days and medical expenses (106,000) Expenditure - decrease supplies in Fire and reallocate to personnel for overtime expense 60,500 Expenditure - increase personnel reallocated from supplies and services in Fire (60,500) Expenditure - increase capital expense for labor costs associated with work performed for capital parks projects (27,400) Expenditure - decrease personnel reallocated to capital in Parks (reimbursed by charges for services)27,400 Expenditure - increase personnel in Facilities for add'l labor expense associated with City Facilities Maintenance (63,000) Expenditure - decrease personnel expense in Finance and reallocate to supplies for temp employment services 15,000 Expenditure - increase supplies in Finance from reallocated personnel expense (15,000) Net adjustment to ending fund balance required $(269,000) Items Previously Approved by Council or Finance Committee New Items Not Previously Approved by Council FUND 001 CITY OF BREMERTON 2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE STREET FUND For the Year Ended December 31, 2012 Amended Proposed Adj Required Mid-Year Year-End From The Budget Budget Amended Budget 2012 2012 2012 REVENUES Taxes Property $$$- Sales - Other (parking tax)454,800 454,800 - Licenses and Permits - Intergovernmental (fuel tax)820,400 820,400 - Charges for Services 145,000 210,000 65,000 Fines and Forfeitures - Miscellaneous 51,800 51,800 - Transfers in & Other Revenue 824,044 824,044 - Total Revenues 2,296,044 2,361,044 65,000 EXPENDITURES Personnel Expenses 1,196,900 1,196,900 - Supplies, Services, and Taxes 1,084,587 1,084,587 - Capital Expenditures 37,987 102,987 65,000 Debt Service - Transfers Out - Total Expenditures 2,319,474 2,384,474 65,000 CHANGES IN FUND BALANCE Net change in fund balances (23,430) (23,430) - Fund Balances-beginning 187,985 187,985 - Fund Balances-ending $164,555 $164,555 $- Budget Adjustments: Revenue - increase charges for services for signal upgrades associated with Crosstown Pipeline Project 65,000 Expenditure - increase capital for signal improvements associated with Crosstown Pipeline Project (65,000) Net adjustment to ending fund balance required $- New Items Not Previously Approved by Council FUND 102 CITY OF BREMERTON 2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE 2010 UTGO/LTGO (B) For the Year Ended December 31, 2012 Amended Proposed Adj Required Mid-Year Year-End From The Budget Budget Amended Budget 2012 2012 2012 REVENUES Taxes Property $412,800 $412,800 $- Sales - Other - Licenses and Permits - Intergovernmental 37,675 37,675 - Charges for Services - Fines and Forfeitures - Miscellaneous 650 650 - Transfers in 72,500 72,500 - Total Revenues 523,625 523,625 - EXPENDITURES Personnel Expenses - Supplies, Services, and Taxes - Capital Expenditures - Debt Service 520,775 521,105 330 Transfers Out - Total Expenditures 520,775 521,105 330 CHANGES IN FUND BALANCE Net change in fund balances 2,850 2,520 (330) Fund Balances-beginning 42,109 42,109 - Fund Balances-ending $44,959 $44,629 $(330) Budget Adjustments: Expenditure - increase debt service fees for BABS Subsidy calculation (330) Net adjustment required to the ending fund balance $(330) New Items Not Previously Approved by Council FUND 204 CITY OF BREMERTON 2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE GOVERNMENT CENTER LTGO For the Year Ended December 31, 2012 Amended Proposed Adj Required Mid-Year Year-End From The Budget Budget Amended Budget 2012 2012 2012 REVENUES Taxes Property $$$- Sales - Other - Licenses and Permits - Intergovernmental - Charges for Services - Fines and Forfeitures - Miscellaneous - - Transfers in & Other Revenue - 5,634,051 5,634,051 Total Revenues - 5,634,051 5,634,051 EXPENDITURES Personnel Expenses - - Supplies, Services, and Taxes - - Capital Expenditures - Debt Service 5,630,398 5,630,398 Transfers Out - - Total Expenditures - 5,630,398 5,630,398 CHANGES IN FUND BALANCE Net change in fund balances - 3,653 3,653 Fund Balances-beginning - Fund Balances-ending $- $3,653 $3,653 Budget Adjustments: Revenue - increase collection of receivables and proceeds from debt refinancing 5,634,051 Expenditures - increase debt service costs for government center refinancing (5,630,398) Net adjustment required to the ending fund balance $3,653 Items Previously Approved by Council FUND 205 CITY OF BREMERTON 2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE HARBORSIDE PLAZA & COMMONS For the Year Ended December 31, 2012 Amended Proposed Adj Required Mid-Year Year-End From The Budget Budget Amended Budget 2012 2012 2012 REVENUES Taxes Property $$$- Sales - Other - Licenses and Permits - Intergovernmental - - - Charges for Services - - Fines and Forfeitures - - Miscellaneous - - - Transfers in & Other Revenue - - Total Revenues - - - EXPENDITURES Personnel Expenses - Supplies, Services, and Taxes - Capital Expenditures - - - Debt Service - Transfers Out 34,336 34,396 60 Total Expenditures 34,336 34,396 60 CHANGES IN FUND BALANCE Net change in fund balances (34,336) (34,396) (60) Fund Balances-beginning 34,336 34,396 60 Fund Balances-ending $- $- $- Budget Adjustments: Expenditure - increase transfer-out to close out fund (housekeeping)(60) Net adjustment required to the ending fund balance $(60) New Items Not Previously Approved by Council FUND 304 CITY OF BREMERTON 2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE PARK PLAZA PHASE II For the Year Ended December 31, 2012 Amended Proposed Adj Required Mid-Year Year-End From The Budget Budget Amended Budget 2012 2012 2012 REVENUES Taxes Property $$$- Sales - Other - Licenses and Permits - Intergovernmental 1,960,331 1,960,331 - Charges for Services - - - Fines and Forfeitures - - Miscellaneous 5,444 5,444 - Transfers in & Other Revenue 1,127,836 1,127,896 60 Total Revenues 3,093,611 3,093,671 60 EXPENDITURES Personnel Expenses - Supplies, Services, and Taxes - Capital Expenditures 3,909,586 3,909,586 - Debt Service - - Transfers Out 200,000 200,000 - Total Expenditures 4,109,586 4,109,586 - CHANGES IN FUND BALANCE Net change in fund balances (1,015,975) (1,015,915) 60 Fund Balances-beginning 1,015,975 1,015,975 - Fund Balances-ending $- $60 $60 Budget Adjustments: Revenue - increase transfer-in from Fund 304 closing out fund (housekeeping)60 Net adjustment required to the ending fund balance $60 New Items Not Previously Approved by Council FUND 306 CITY OF BREMERTON 2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE PARK FACILITIES CONSTRUCTION FUND For the Year Ended December 31, 2012 Amended Proposed Adj Required Mid-Year Year-End From The Budget Budget Amended Budget 2012 2012 2012 REVENUES Taxes Property $$$- Sales - Other - Licenses and Permits - Intergovernmental 745,000 745,000 - Charges for Services - - Fines and Forfeitures - - Miscellaneous 225,000 225,000 - Transfers in & Other Revenue 421 421 - Total Revenues 970,421 970,421 - EXPENDITURES Personnel Expenses - Supplies, Services, and Taxes - - - Capital Expenditures 1,334,000 1,376,500 42,500 Debt Service 5,700 19,800 14,100 Transfers Out - - - Total Expenditures 1,339,700 1,396,300 56,600 CHANGES IN FUND BALANCE Net change in fund balances (369,279) (425,879) (56,600) Fund Balances-beginning 783,948 783,948 - Fund Balances-ending $414,669 $358,069 $(56,600) Budget Adjustments: Expenditure - increase capital expense for pool lighting upgrades (42,500) Expenditure - increase debt service for pool upgrades (14,100) Net adjustment required to the ending fund balance $(56,600) New Items Not Previously Approved by Council FUND 310 City of Bremerton 2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE WATER UTILITY For the Year Ended December 31, 2012 Amended Proposed Adj Required Mid-Year Year-End From The Budget Budget Amended Budget 2012 2012 2012 REVENUES Taxes Property $$$- Sales - Other - Licenses and Permits - Intergovernmental - - Charges for Services 9,073,900 9,073,900 - Fines and Forfeitures - - - Miscellaneous 326,392 326,392 - Transfers in & Other Revenue 10,290 10,290 - Total Revenues 9,410,582 9,410,582 - EXPENDITURES Personnel Expenses 3,762,140 3,762,140 - Supplies, Services, and Taxes 3,511,080 3,511,080 - Capital Expenditures - - - Debt Service 723,062 735,487 12,425 Transfers Out 5,496,467 5,496,467 - Total Expenditures 13,492,749 13,505,174 12,425 CHANGES IN WORKING CAPITAL BALANCE Net change in working capital (4,082,167) (4,094,592) (12,425) Fund Balances-beginning working capital 5,217,167 5,217,167 - Fund Balances-ending working capital $1,135,000 $1,122,575 $(12,425) Budget Adjustments: Expenditure - increase debt service principal payment (housekeeping)(12,425) Net adjustment required to the ending fund balance $(12,425) New Items Not Previously Approved by Council The target ending fund balance is 12% of annual expenditures excluding transfers for capital. The target fund balance for the 2012 budget as amended is $1,136,491. Projected Balance is $1,122,575 after proposed amendments are completed - which is slightly below target. FUND 401 CITY OF BREMERTON 2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE GOLD MOUNTAIN GOLF COMPLEX For the Year Ended December 31, 2012 Amended Proposed Adj Required Mid-Year Year-End From The Budget Budget Amended Budget 2012 2012 2012 REVENUES Taxes Property $$$ Sales Other Licenses and Permits Intergovernmental Charges for Services 1,950,000 1,950,000 - Fines and Forfeitures - Miscellaneous 89,000 89,000 - Transfers in - - - Total Revenues 2,039,000 2,039,000 - EXPENDITURES Personnel Expenses Supplies, Services, and Taxes 1,812,254 1,812,254 - Capital Expenditures 295,500 295,500 - Debt Service 285,705 286,205 500 Transfers Out - - - Total Expenditures 2,393,459 2,393,959 500 CHANGES IN FUND BALANCE Net change in working capital (354,459) (354,959) (500) Fund Balances-beginning working capital 374,539 374,539 - Fund Balances-ending working capital $20,080 $19,580 $(500) Budget Adjustments: Expenditure - increase for debt service fee's associated with short-term interfund loan from ER&R (500) Net adjustment required to the ending fund balance $(500) Items Previously Approved by Council The target ending fund balance is 12% of annual expenditures excluding capital. The target fund balance for the 2012 budget as amended is $251,815. Projected Balance is $19,580 after proposed amendments are completed - which does not meet the target level. FUND 407 CITY OF BREMERTON 2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE WASTEWATER UTILITY For the Year Ended December 31, 2012 Amended Proposed Adj Required Mid-Year Year-End From The Budget Budget Amended Budget 2012 2012 2012 REVENUES Taxes Property $- $- $- Sales - - Other - - - Licenses and Permits - - - Intergovernmental - - - Charges for Services 13,612,612 13,612,612 - Fines and Forfeitures - - Miscellaneous 27,500 27,500 - Transfers in & Other Revenue - - Total Revenues 13,640,112 13,640,112 - EXPENDITURES Personnel Expenses 2,655,090 2,655,090 - Supplies, Services, and Taxes 4,066,616 4,066,616 - Capital Expenditures - - - Debt Service 2,823,563 2,838,063 14,500 Transfers Out 11,977,232 11,977,232 - Total Expenditures 21,522,501 21,537,001 14,500 CHANGES IN FUND BALANCE Net change in working capital (7,882,389) (7,896,889) (14,500) Fund Balances-beginning working capital 9,355,066 9,355,066 - Fund Balances-ending working capital $1,472,677 $1,458,177 $(14,500) Budget Adjustments: Expenditure - increase debt service for principal and interest on intergovernmental loans (14,500) Net adjustment required to the ending fund balance $(14,500) New Items Not Previously Approved by Council The target ending fund balance is 12% of annual expenditures excluding transfers for capital. The target fund balance for the 2012 budget as amended is $1,474,417. Projected balance is $1,472,677 after proposed amendments are completed - which is slightly below the target level. FUND 451 CITY OF BREMERTON 2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE RISK MANAGEMENT INTERNAL SERVICE FUND For the Year Ended December 31, 2012 Amended Proposed Adj Required Mid-Year Year-End From The Budget Budget Amended Budget 2012 2012 2012 REVENUES Taxes Property $$$- Sales - Other - Licenses and Permits - Intergovernmental - Charges for Services - Fines and Forfeitures - Miscellaneous 1,429,900 1,429,900 - Transfers in - Total Revenues 1,429,900 1,429,900 - EXPENDITURES Personnel Expenses 240,000 240,000 - Supplies, Services, and Taxes 1,189,900 1,219,900 30,000 Capital Expenditures - Debt Service - Transfers Out - Total Expenditures 1,429,900 1,459,900 30,000 CHANGES IN FUND BALANCE Net change in working capital - (30,000) (30,000) Fund Balances-beginning working capital 1,793,583 1,793,583 - Fund Balances-ending working capital $1,793,583 $1,763,583 $(30,000) Budget Adjustments: Expenditures - Increase supplies and services due to additional unforeseen claim payments (30,000) Net adjustment required to the ending fund balance $(30,000) New Items Not Previously Approved by Council FUND 503 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Ordinance No. _____ amending Chapter 9.88 of the Bremerton Municipal code entitled “Marijuana.” Study Session Date: December 12, 2012 COUNCIL MEETING Date: December 19, 2012 Department: City Attorney’s Office Presenter: Roger A. Lubovich Phone: 360-473-2345 SUMMARY: Due to the recent passage of Initiative 502, it is necessary to amend the City’s code relating to marijuana to be consistent with the new law. ATTACHMENTS: Proposed Ordinance ______ FISCAL IMPACTS (Include Budgeted Amount): None STUDY SESSION AGENDA: ☐ No Discussion ☒ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to pass Ordinance No. ______ amending Chapter 9.88 of the Bremerton Municipal code entitled “Marijuana.” COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 11/02/12 1 Marijuana ORDINANCE NO. ________ AN ORDINANCE of the City Council of the City of Bremerton, Washington, amending Chapter 9.88 of the Bremerton Municipal code entitled “Marijuana.” WHEREAS, the current provisions of Chapter 9.88 of the Bremerton Municipal Code relating to marijuana are no longer consistent with recent changes to state law as a result of Initiative Measure 502 recently passed by the voters; and WHEREAS, the City Council desires to update the provisions relating to marijuana in order to be consistent with state law; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. Chapter 9.88 of the Bremerton Municipal Code entitled "Marijuana" is hereby amended to read as follows: Chapter 9.88 MARIJUANA 9.88.010 DEFINITIONS. "Drug paraphernalia" is defined as currently set forth in RCW 69.50.102, or hereinafter amended. "Marijuana" is defined as: All parts of the plant of the genus Cannabis L., whether growing or not; the seeds thereof; the resin extracted from any part of the plant; and every compound, manufacture, salt, derivative, mixture, or preparation of the plant, its seeds or resin. It does not include the mature stalks of the plant, fiber produced from the stalks, oil or cake made from the seeds of the plant, any other compound, manufacture, salt, derivative, mixture or preparation of the mature stalks (except the resin extracted therefrom), fiber, oil or cake, or the sterilized seed of the plant which is incapable of germination. The following definitions are hereby adopted: (a) RCW 69.50.101 entitled “Definitions” is hereby adopted by reference as currently enacted and as hereinafter amended from time to time, and shall be given the same force and effect as if set forth herein in full. (b) RCW 69.50.102 entitled “Drug paraphernalia – Definitions” is hereby adopted by reference as currently enacted and as hereinafter amended from time to time, and shall be given the same force and effect as if set forth herein in full. 9.88.020 MARIJUANA POSSESSION. Any person found guilty of possession of forty (40) grams or less of marijuana shall be guilty of a misdemeanor. RCW 69.50.4013, with the exception of those provisions contained therein for which a violation constitutes a felony crime, is hereby adopted by reference as Formatted: Outline numbered + Level: 2 + Numbering Style: a, b, c, … + Start at: 1 + Alignment: Left + Aligned at: 0.5" + Tab after: 0.5" + Indent at: 0" 2 Marijuana currently enacted and as hereinafter amended from time to time, and shall be given the same force and effect as if set forth herein in full. 9.88.030 POSSESSION OF DRUG PARAPHERNALIA. RCW 69.50.412, with the exception of those provisions contained therein for which a violation constitutes a felony crime, is hereby adopted by reference as currently enacted and as hereinafter amended from time to time, and shall be given the same force and effect as if set forth herein in full. 9.88.040 MISDEMEANOR VIOLATIONS - MINIMUM IMPRISONMENTPENALTIES. RCW 69.50.425 is hereby adopted by reference as currently enacted and as hereinafter amended from time to time, and shall be given the same force and effect as if set forth herein in full. A person who is convicted of a misdemeanor violation of BMC 9.88.020 or BMC 9.88.030 shall be subject to punishment pursuant to RCW 69.50.425. punished by imprisonment for not less than twenty-four (24) consecutive hours, and by a fine of not less than two hundred fifty dollars ($250.00). On a second or subsequent conviction, the fine shall not be less than five hundred dollars ($500.00). These fines shall be in addition to any other fine or penalty imposed. Unless the court finds that the imposition of the minimum imprisonment will pose a substantial risk to the defendant's physical or mental well-being or that local jail facilities are in an overcrowded condition, the minimum term of imprisonment shall not be suspended or deferred. If the court finds such risk or overcrowding exists, it shall sentence the defendant to a minimum of forty (40) hours of community service. If a minimum term of imprisonment is suspended or deferred, the court shall state in writing the reason for granting the suspension or deferral and the facts upon which the suspension or deferral is based. Unless the court finds the person to be indigent, the minimum fine shall not be suspended. 9.88.050 MARIJUANA - IN VIEW OF GENERAL PUBLIC - INFRACTION. Chapter 69.50 RCW, Initiative No. 502 Section 21 (Judicial Information System No. 13C3521) relating to the opening, use or consumption of marijuana, usable marijuana or marijuana –infused products in view of the general public is hereby adopted by reference as currently enacted and as hereinafter amended from time to time, and shall be given the same force and effect as if set forth herein in full. A person who violates this section is guilty of a class 3 civil infraction pursuant to RCW 7.80.120(1)(c) as currently enacted and as hereinafter amended from time to time. SECTION 2. Severability. If any one or more sections, subsections, or sentences of this Ordinance are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Ordinance and the same shall remain in full force and effect. SECTION 3. Effective Date. This ordinance shall take effect and be in force ten (10) days from and after its passage, approval and publication as provided by law. PASSED by the City Council the___________ day of ____________________, 2012 Formatted: Normal, Indent: First line: 0.5" 3 Marijuana _________________________________ JIM McDONALD, Council President Approved this ________ day of ________________________, 2012 _________________________________ PATTY LENT, Mayor ATTEST: APPROVED AS TO FORM: __________________________________ ________________________________ SHANNON CORIN, City Clerk ROGER A. LUBOVICH, City Attorney PUBLISHED the________ day of ______________________, 2012 EFFECTIVE the_________day of ______________________, 2012 ORDINANCE NO. ____________ R:\Legal\Legal\Ordinances\legal\Marijuana (2012)1.doc