HomeMy WebLinkAbout12/12/2012 AGENDA 'IF . I
CITY COUNCIL 345 6th Street, Suite 600, Bremerton, WA 98337 I 1 Phone (360) 473 -5280
DECEMBER 12, 2012
CITY COUNCIL SPECIAL MEETING
4:00 PM — STUDY SESSION in COUNCIL CONFERENCE ROOM 603
The Study Session is open to the public but there will be no opportunities for input or participation; no
action is anticipated during the Study Session; and the content of these items is subject to change. If
approved by Council, the items will be placed on the December 19, 2012 Council Meeting Agenda:
A. NO PRESENTATION PLANNED -The following items are budgeted items or have been
reviewed by the appropriate Council Committee:
1. 2013 Property Insurance Renewals
2. Purchase of Sensus Water Meter Transceiver Units (MXUs) from Ferguson Waterworks
3. Agreement with Harris Computer Systems for Software Upgrade for Utility Billing and
Customer Service Function
4. Appointment of Kevin Matthew to the position of Information Technology Manager at a step
higher than Rate 1 in Pay Band 16
5. Acceptance of Interpreter Grant - Interlocal Agreement ICA 133368
6. Public Hearing and Ordinance to adopt the 2012 Comprehensive Plan Amendment Docket
B. FULL DISCUSSION ITEMS
7. Amendment to the Interlocal Agreement regarding Emergency Communications and other
Services
8. Proposed Ordinance to amend Ordinance No. 5173 establishing the City of Bremerton's
Fiscal Year 2012 Budget as amended by Ordinance No. 5186
9. Proposed Ordinance to amend Chapter 9.88 of the Bremerton Municipal Code (BMC)
entitled "Marijuana"
C. GENERAL COUNCIL BUSINESS
D. DISCUSSION ON UTILITY RATE STUDY - Council will reconvene in the Mayor's Conference
Room with members of the FCS Group and Utility Rate Study Advisory Committee
(Continued from November 14...)
E. ADJOURN STUDY SESSION
Americans with Disabilities Act accommodations provided upon request. Those requiring special accommodations
should contact the City Clerk's Office at (360) 473 -5323 by noon on the Monday preceding the Council meeting.
______________________________________________________________
CITY COUNCIL 345 6th Street, Suite 600, Bremerton, WA 98337 Phone (360) 473-5280
DECEMBER 12, 2012
CITY COUNCIL SPECIAL MEETING
4:00 PM – STUDY SESSION in COUNCIL CONFERENCE ROOM 603
The Study Session is open to the public but there will be no opportunities for input or participation; no
action is anticipated during the Study Session; and the content of these items is subject to change. If
approved by Council, the items will be placed on the December 19, 2012 Council Meeting Agenda:
A. NO PRESENTATION PLANNED - The following items are budgeted items or have been
reviewed by the appropriate Council Committee:
1. 2013 Property Insurance Renewals
2. Purchase of Sensus Water Meter Transceiver Units (MXUs) from Ferguson Waterworks
3. Agreement with Harris Computer Systems for Software Upgrade for Utility Billing and
Customer Service Function
4. Appointment of Kevin Matthew to the position of Information Technology Manager at a step
higher than Rate 1 in Pay Band 16
5. Acceptance of Interpreter Grant - Interlocal Agreement ICA 133368
6. Public Hearing and Ordinance to adopt the 2012 Comprehensive Plan Amendment Docket
B. FULL DISCUSSION ITEMS
7. Amendment to the Interlocal Agreement regarding Emergency Communications and other
Services
8. Proposed Ordinance to amend Ordinance No. 5173 establishing the City of Bremerton's
Fiscal Year 2012 Budget as amended by Ordinance No. 5186
9. Proposed Ordinance to amend Chapter 9.88 of the Bremerton Municipal Code (BMC)
entitled "Marijuana"
C. GENERAL COUNCIL BUSINESS
D. DISCUSSION ON UTILITY RATE STUDY - Council will reconvene in the Mayor's Conference
Room with members of the FCS Group and Utility Rate Study Advisory Committee
(Continued from November 14…)
E. ADJOURN STUDY SESSION
Americans with Disabilities Act accommodations provided upon request. Those requiring special accommodations
should contact the City Clerk’s Office at (360) 473-5323 by noon on the Monday preceding the Council meeting.
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: 2013 Property Insurance
Renewal
Study Session Date: Dec. 12, 2012
COUNCIL MEETING Date: Dec. 19, 2012
Department: City Attorney’s Office
Presenter: Thelma Swem
Phone: 360-473-5302
SUMMARY: The Bremerton Municipal Code authorizes the Risk Management Specialist, with the
approval of the City Attorney, to bind property insurance coverage on City assets and requires City
Council approval for the continuation of the bound coverage. Property insurance coverage for 2013
has been bound with Lexington Insurance Company. The annual premium for 2013 is $274,660.23.
Coverage is subject to a $100,000 deductible for most losses. Earthquake and flood insurance is only
provided for the Wastewater Treatment Plant, the Harborside Conference Center, the Harborside
Sculptures and Fountains, and PSNS Memorial Plaza.
ATTACHMENTS: Summary of Quotes
FISCAL IMPACTS (Include Budgeted Amount): Sufficient funds have been budgeted in the Risk
Management Fund for this expenditure for 2013.
STUDY SESSION AGENDA: ☒ No Discussion ☐ Full Presentation
STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION: Move to approve continuation of property insurance bound with
Lexington Insurance Company for 2013.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/02/12
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Purchase of Sensus Water
Meter Transceiver Units (MXU’s)
Study Session Date: December 12, 2012
COUNCIL MEETING Date: December 19, 2012
Department: PW&U
Presenter: Chal Martin
Phone: 473-5315
SUMMARY: Due to failing batteries and poor internal wiring of old water meter transmitters, Public
Works staff began replacing water meter transceivers with more reliable models two years ago. The
City now has almost 1,900 of the new transceivers in service, out of 18,246 in the system. The new
transceivers have a 15-year minimum battery life (vs. 6 years for the old transceivers), and improved
transceiver range. A sole source upgrade / exchange program has been established with Ferguson
Waterworks in Tacoma (Ferguson is the authorized distributor) to purchase new transceivers, with a
credit if the purchase is made prior to the end of January, 2013. We have accumulated 1,882 of the
old transceivers to turn in for credit. Purchase price for 1,882 new transceivers is $253,637.14,
including the credit and including sales tax.
ATTACHMENTS:
1. General Information Sheet
2. Transmitter (MXU) upgrade/exchange unit pricing sheet
3. Sole Source Determination
4. Warranty (For information)
FISCAL IMPACTS (Include Budgeted Amount): The 2012 Water Utility O&M expense budget is
$13,492,749. With this purchase, final 2012 expenditures are projected to be $12,962,880, which is
about $100,000 below our previous end-of-year projection for 2013 budget formulation (good).
STUDY SESSION AGENDA: ☒ No Discussion ☐ Full Presentation
STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve the purchase of water meter transceivers from Ferguson Waterworks and authorize
the Mayor to finalize and execute the purchase with substantially the same terms and conditions as
presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/02/12
Public Works and Utilities Department
100 Oyster Bay Ave. N. Bremerton, WA 98312 (360) 473-5315 FAX (360) 473-5360
MEMORANDUM
DATE: November 28, 2012
TO: Procurement File
FROM: Chal Martin, Public Works & Utilities Director
SUBJECT: Sole Source Determination
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
In accordance with Bremerton Municipal Code 2.76.090, Sole Source Purchases, the
purpose of this memorandum is to document the necessity of sole source
procurement methodology for Sensus 520R water meter transceiver units (MXUs).
The City has a requirement to replace aging transmitters on over 18,000 meters in
its system. For efficiency of maintenance operations, and for reasons of
compatibility with existing meter reading systems, the City chose the Sensus 520R
transceiver as its standard for replacement. Establishing a standard enables the
City to save money through reduced inventory, and save money and staff time by
virtue of reduced maintenance complications that ensue from operating a system
with multiple brands and repair parts.
Over the past two years, the City has installed approximately 1,900 of the
transceiver units, and experience to date indicates the units are of high quality and
are exceeding the Utility’s expectations for reliability and performance.
Sensus Metering Systems, the manufacturer, contracts with regional suppliers who
are the only authorized distributors of the product. Therefore, the only source for
the particular transceiver units required by the City, are the regional distributors.
Any request for bids would only receive a single bid from the regional distributor.
Because the City of Bremerton is a large customer, the regional distributor for this
area, Ferguson Waterworks, has agreed to provide a credit for the old meters.
Public Works staff has determined that Ferguson’s pricing is reasonable.
Therefore, it is my determination that sole source purchase of Sensus 520R water
meter transceiver units is justified for this procurement.
Sensus Limited Warranty
I. General Product Coverage
Sensus USA Inc. (“Sensus”) warrants its products and parts to be free from defects
in material and workmanship for one (1) year from the date of Sensus shipment
and as set forth below. All products are sold to customer (“Customer”) pursuant to
Sensus’ Terms of Sale, avail¬able at: http://sensus.com/TC/ (“Terms of Sale”).
II. SR II® and accuSTREAM™ 5/8”, 3/4” & 1” Meters…
are warranted to perform to AWWA New Meter Accuracy Standards for fi ve (5)
years from the date of Sensus shipment or until the regis¬tration shown below,
whichever occurs fi rst. Sensus further warrants that the SR II meter will perform to
at least AWWA Repaired Meter Accuracy Standards for fi fteen (15) years from the
date of Sensus shipment or until the registration shown below, whichever occurs
fi rst:
New Meter Accuracy Repair Meter Accuracy
5/8” SR II Meter and
accuSTREAM Meter 500,000 gallons 1,500,000 gallons
3/4” SR II Meter and
accuSTREAM Meter 750,000 gallons 2,250,000 gallons
1” SR II Meter and
accuSTREAM Meter 1,000,000 gallons 3,000,000 gallons
III. SR® 5/8”, 3/4” & 1” Meters…
are warranted to perform to AWWA New Meter Accuracy Standards for one (1) year
from the date of Sensus shipment. Sensus further warrants that the 5/8”, 3/4” and
1” SR meter will perform to at least AWWA Repaired Meter Accuracy Standards for
fi fteen (15) years from the date of Sensus shipment or until the registration shown
below, whichever occurs fi rst:
Repair Meter Accuracy
5/8” SR Meter 1,500,000 gallons
3/4” SR Meter 2,250,000 gallons
1” SR Meter 3,000,000 gallons
IV. SR 1-1/2” & 2” Meters…
are warranted to perform to AWWA New Meter Accuracy Standards for one (1) year
from the date of Sensus shipment. Sensus further warrants that the 1-1/2” and 2”
SR meter will per¬form to at least AWWA Repaired Meter Accuracy Standards for
ten (10) years from the date of Sensus shipment or until the registration shown
below, whichever occurs fi rst:
Repair Meter Accuracy
1-1/2” SR Meter 5,000,000 gallons
2” SR Meter 8,000,000 gallons
V. PMM® 5/8”, 3/4”, 1” Meters…
are warranted to perform to AWWA New Meter Accuracy Standards for one (1) year
from the date of Sensus shipment. Sensus further warrants that the 5/8”, 3/4”, and
1” PMM meter will perform to at least AWWA Repaired Meter Accuracy Standards
for fi fteen (15) years from the date of Sensus shipment or until the registration
shown below, whichever occurs fi rst:
Repair Meter Accuracy
5/8” PMM 1,500,000 gallons
3/4” PMM 2,000,000 gallons
1” PMM 3,000,000 gallons
VI. PMM 1-1/2”, 2” Meters…
are warranted to perform to AWWA New Meter Accuracy Standards for one (1) year
from the date of Sensus shipment. Sensus further warrants that the 1-1/2”, and 2”
PMM meter will perform to at least AWWA Repaired Meter Accuracy Standards for
ten (10) years from the date of Sensus shipment or until the registration shown
below, whichever occurs fi rst:
Repair Meter Accuracy
1-1/2” PMM 5,000,000 gallons
2” PMM 8,000,000 gallons
VII. iPERL™ Water Management Systems...
that register water fl ow are warranted to perform to the accuracy levels set forth
in the iPERL Water Management System Data Sheet (IPL-110), available at www.
sensus.com/iperl or by request from 1-800-METER-IT, for twenty (20) years from
the date of Sensus shipment. The iPERL System warranty does not include the
external housing.
VIII. Maincase…
of the SR, SR II and PMM in both standard and low lead alloy meters are warranted
to be free from defects in material and work¬manship for twenty-fi ve (25) years
from the date of Sensus shipment. Composite and E-coated maincases will be free
from defects in mate¬rial and workmanship for fi fteen (15) years from the date of
Sensus shipment.
IX. Sensus “W” Series Turbo Meters, OMNI™ Me¬ters and Propeller Meters…
are warranted to perform to AWWA New Meter Accuracy Standards for one (1) year
from the date of Sensus shipment.
X. Sensus accuMAG™ Meters...
are warranted to be free from defects in material and workmanship, under normal
use and service, for 18 months from the date of Sensus shipment or 12 months
from startup, whichever occurs fi rst.
XI. Sensus Registers…
are warranted to be free from defects in material and workmanship from the date
of Sensus shipment for the periods stated below or until the applicable registration
for AWWA Repaired Meter Accuracy Standards, as set forth above, are surpassed,
whichever occurs fi rst:
5/8” thru 2” SR, SR II, PMM, accuSTREAM
Standard Registers 25 years
5/8” thru 2” SR, SR II, PMM, accuSTREAM
Encoder Registers 10 years
Electronic Communication Index (ECI) 10 years
All HSPU, IMP Contactor, R.E.R. Elec. ROFI 1 year
Standard and Encoder Registers for: “W” Turbo
and Propeller Meters 1 year
OMNI Register with Battery 10 years
XII. Sensus Electric Meters…
are warranted to be free from defects in material and workmanship for one (1) year
from the date of Sensus shipment. Spare parts and components are warranted to
be free from defects in material and workmanship for one (1) year from the date of
Sensus shipment.
Repaired or refurbished equipment repaired by Sensus is warranted to be free from
defects in material and workmanship for ninety (90) days from the date of Sensus
shipment or for the time remaining on the original warranty period, whichever is
longer.
XIII. Batteries, iPERL System Components, AMR and FlexNet™ System AMI
Interface Devices…
are warranted to be free from defects in material and workmanship from the date of
Sensus shipment for the period stated below:
Electronic TouchPads 10 years
RadioRead® MXU (Model 505C, 510R or 520R)
and Batteries 20 years*
Act-Pak® Instrumentation 1 year
TouchRead® Coupler and AMR Equipment 1 year
FlexNet Water or Gas SmartPoint™ Modules and Batteries 20 years*
Hand Held Device 1 year
Vehicle Gateway Base Station 1 year
FlexNet Base Station 1 year
Echo Transceiver 1 year
(continued)
G-500 R16
XIII. Batteries, iPERL System Components, AMR and FlexNet™ System AMI
Interface Devices… (continued)
Remote Transceiver 1 year
iConA and FlexNet Electricity SmartPoint Module 1 year
iPERL System Battery and iPERL System Components 20 years*
* Sensus will repair or replace non-performing:
• RadioRead® MXU (Model 505C, 510R and 520R) and Batteries,
• FlexNet Water or Gas SmartPoint Modules (confi gured to the factory setting of six
transmissions per day) and batteries,
• iPERL System Batteries, and/or the iPERL System fl owtube, the fl ow sensing and
data processing assemblies, and the register (“iPERL System Components”)
at no cost for the fi rst ten (10) years from the date of Sensus ship¬ment, and for the
remaining ten (10) years, at a prorated percentage, applied towards the published
list prices in effect for the year product is accepted by Sensus under warranty
conditions according to the following schedule:
Years Replacement Price Years Replacement Price
1-10 0% 16 55%
11 30% 17 60%
12 35% 18 65%
13 40% 19 70%
14 45% 20 75%
15 50% >20 100%
Note: Software supplied and licensed by Sensus is warranted accord¬ing to the
terms of the applicable software license agreement. Sensus warrants that network
and monitoring services shall be performed in a professional and workmanlike
manner.
XIV. Return…
Sensus’ obligation, and Customer’s exclusive remedy, under this Sensus Limited
Warranty is, at Sensus’ option, to either (i) repair or replace the product, provided
the Customer (a) returns the product to the location designated by Sensus within
the warranty period; and (b) prepays the freight costs both to and from such
location; or (ii) deliver replacement components to the Customer, provided the
Customer installs, at its cost, such components in or on the product (as instructed
by Sensus).
The return of products for warranty claims must follow Sensus’ Returned Materials
Authorization (RMA) procedures. Water meter returns must include documentation
of the Customer’s test results. Test results must be obtained according to AWWA
standards and must specify the meter serial number. The test results will not
be valid if the meter is found to contain foreign materials. If Customer chooses
not to test a Sensus water meter prior to returning it to Sen¬sus, Sensus will
repair or replace the meter, at Sensus’ option, after the meter has been tested by
Sensus. The Customer will be charged Sensus’ then current testing fee. Sensus
SmartPoints modules and MXU’s returned must be affi xed with a completed
return evaluation label. For all returns, Sensus reserves the right to request meter
read¬ing records by serial number to validate warranty claims.
For products that have become discontinued or obsolete (“Obsolete Product”),
Sensus may, at its discretion, replace such Obsolete Product with a different
product model (“New Product”), provided that the New Product has substantially
similar features as the Obsolete Product. The New Product shall be warranted as
set forth in this Sensus Limited Warranty.
THIS SECTION XIV SETS FORTH CUSTOMER’S SOLE REMEDY FOR THE
FAILURE OF THE PRODUCTS, SERVICES OR LICENSED SOFT¬WARE TO
CONFORM TO THEIR RESPECTIVE WAR¬RANTIES.
XV. Warranty Exceptions and No Implied Warranties…
This Sensus Limited Warranty does not include costs for removal or instal¬lation of
products, or costs for replacement labor or materials, which are the responsibility
of the Customer. The warranties in this Sensus Limited Warranty do not apply to
goods that have been: installed improperly or in non-recommended installations;
installed to a socket that is not functional, or is not in safe operating condition,
or is damaged, or is in need of repair; tampered with; modifi ed or repaired with
parts or assemblies not certifi ed in writing by Sensus, including without limitation,
communication parts and assemblies; improperly modifi ed or repaired (including
as a result of modifi cations required under section XIV); converted; altered;
damaged; read by equipment not approved by Sensus; for water meters, used
with substances other than water, used with non-potable water, or used with
water that contains dirt, debris, deposits, or other impurities; subjected to misuse,
improper storage, improper care, improper maintenance, or improper periodic
testing (collectively, “Exceptions.”). If Sensus identifi es any Exceptions during
examination, troubleshooting or performing any type of support on behalf of
Customer, then Customer shall pay for and/or reimburse Sensus for all expenses
incurred by Sensus in examining, troubleshooting, performing support activities,
repairing or replacing any Equipment that satisfi es any of the Exceptions defi ned
above. The above warranties do not apply in the event of Force Majeure, as
defi ned in the Terms of Sale.
THE WARRANTIES SET FORTH IN THIS SENSUS LIMITED WARRANTY ARE
THE ONLY WARRANTIES GIVEN WITH RESPECT TO THE GOODS, SOFTWARE
LICENSES AND SERVICES SOLD OR OTHERWISE PROVIDED BY SENSUS.
SENSUS EXPRESSLY DISCLAIMS ANY AND ALL OTHER REPRESENTATIONS
AND WARRANTIES, INCLUDING WITHOUT LIMITATION, WARRANTIES AS
TO FITNESS FOR A PARTICULAR PURPOSE, MERCHANTABILITY, NON-
INFRINGEMENT AND TITLE.
SENSUS ASSUMES NO LIABILITY FOR COSTS OR EXPENSES ASSOCIATED
WITH LOST REVENUE OR WITH THE REMOVAL OR INSTALLATION OF
EQUIPMENT. THE FOREGOING REMEDIES ARE CUSTOMER’S SOLE AND
EXCLUSIVE REMEDIES FOR THE FAILURE OF EQUIPMENT, LICENSED
SOFTWARE OR SERVICES TO CONFORM TO THEIR RESPECTIVE
WARRANTIES.
XVI. Limitation of Liability...
SENSUS’ AGGREGATE LIABILITY IN ANY AND ALL CAUSES OF ACTION
ARISING UNDER, OUT OF OR IN RELATION TO THIS AGREEMENT, ITS
NEGOTIATION, PERFORMANCE, BREACH OR TERMINATION (COLLECTIVELY
“CAUSES OF ACTION”) SHALL NOT EXCEED THE TOTAL AMOUNT PAID BY
CUSTOMER TO SENSUS UNDER THIS AGREEMENT. THIS IS SO WHETHER
THE CAUSES OF ACTION ARE IN TORT, INCLUDING, WITHOUT LIMITATION,
NEGLIGENCE OR STRICT LIABILITY, IN CONTRACT, UNDER STATUTE OR
OTHERWISE.
AS A SEPARATE AND INDEPENDENT LIMITATION ON LIABILITY, SENSUS’
LIABILITY SHALL BE LIMITED TO DIRECT DAMAGES. SENSUS SHALL NOT BE
LIABLE FOR: (I) ANY INDIRECT, INCIDENTAL, SPECIAL OR CONSEQUENTIAL
DAMAGES; NOR (II) ANY REVENUE OR PROFITS LOST BY CUSTOMER OR ITS
AFFILIATES FROM ANY END USER(S), IRRESPECTIVE OF WHETHER SUCH
LOST REVENUE OR PROFITS IS CATEGORIZED AS DIRECT DAMAGES OR
OTHERWISE; NOR (III) ANY IN/OUT COSTS; NOR (IV) MANUAL METER READ
COSTS AND EXPENSES; NOR (V) DAMAGES ARISING FROM MAINCASE OR
BOTTOM PLATE BREAKAGE CAUSED BY FREEZING TERMPERATURES,
WATER HAMMER CONDITIONS, OR EXCESSIVE WATER PRESSURE.
“IN/OUT COSTS” MEANS ANY COSTS AND EXPENSES INCURRED BY
CUSTOMER IN TRANSPORTING GOODS BETWEEN ITS WAREHOUSE AND
ITS END USER’S PREMISES AND ANY COSTS AND EXPENSES INCURRED
BY CUSTOMER IN INSTALLING, UNINSTALLING AND REMOVING GOODS.
“END USER” MEANS ANY END USER OF ELECTRICITY/WATER/GAS THAT
PAYS CUSTOMER FOR THE CONSUMPTION OF ELECTRICITY/WATER/GAS,
AS APPLICABLE.
The limitations on liability set forth in this Agreement are fundamental inducements
to Sensus entering into this Agreement. They apply unconditionally and in all
respects. They are to be interpreted broadly so as to give Sensus the maximum
protection permitted under law.
To the maximum extent permitted by law, no Cause of Action may be instituted
by Customer against Sensus more than TWELVE (12) MONTHS after the Cause
of Action fi rst arose. In the calculation of any damages in any Cause of Action,
no damages incurred more than TWELVE (12) MONTHS prior to the fi ling of the
Cause of Action shall be recoverable.
8601 Six Forks Road, Suite 700
Raleigh, NC 27615
1-800-638-3748
Sensus Limited Warranty
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Software Upgrade for Utility
Billing and Customer Service Function
Study Session Date: 12/12/12
COUNCIL MEETING Date: 12/19/12
Department: Public Works
Presenter: Chal Martin
Phone: 473-5315
SUMMARY: : In 2006, the City upgraded the utility billing software to a Harris product called
InHance. In 2009 a Federal Regulation (Red Flag Identity Theft) went into effect which required
Harris to upgrade their software to incorporate better identity security and encryption. The requested
council action is upgrade/replacement of the InHance software to a new format called ICIS. The ICIS
software uses a different technology (.NET, a windows environment) that includes faster processing,
faster debugging mechanisms, enhanced reporting and a better internal security structure. It is
important that we do this upgrade since Harris has indicated they will no longer support the older
InHance software in the future. Our original purchase of the InHance software allowed for upgrades
at no cost; however, change to the new .NET technology will require in-house training and
programming of our custom forms. The cost of this Agenda Item is limited to training, programming
and installation.
ATTACHMENTS:
1. Proposal
FISCAL IMPACTS (Include Budgeted Amount): The cost of the software upgrade, training, and
programming is $22,950. Additional costs may accrue during software installation; however, these
costs are expected to be minimal. The 2012 budgeted amount for this software upgrade was
$20,000 -- $10,000 from the Water Utility and $10,000 from the Sewer Utility. This request exceeds
the 2012 budgeted amount but will not cause either fund to exceed our previously-projected year-end
balances; therefore, no budget amendment is needed.
STUDY SESSION AGENDA: ☒ No Discussion ☐ Full Presentation
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve an agreement with Harris Computer Systems for upgrade of the City’s utility billing
software, and authorize the Mayor to finalize and execute the agreement with substantially the same
terms and conditions as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/02/12
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Appointment of Kevin Matthew
to the position of Information Technology
Manager at a step higher than Rate 1 in Pay
Band 16.
Study Session Date: December 12, 2012
COUNCIL MEETING Date: December 19, 2012
Department: Financial Services
Presenter: Becky Hasart
Phone: 360-473-5722
SUMMARY: The current Information Technology (IT) Manager will be retiring at the end of
December after having been with the City for over 29 ½ years. The Director of Financial Services
has been working with the IT Manager on identifying those within existing IT staff that could be
groomed to become a replacement for when the retirement would become effective (succession
planning). As such, our current Network Administrator, Kevin Matthew, is being appointed to the IT
Manager position effective January 1, 2013.
Mr. Matthew has been employed by the City of Bremerton for 23 years including 2 years as a
Computer Programmer Analyst and 21 years as the Network Administrator. Over the last six
months, Mr. Matthew has shown he has the knowledge and experience to be able to perform the
manager’s job and can step into this new role with minimal disruption to City services. The IT
Manager’s pay band is non-represented pay band 16. Step 1 would only increase Mr. Matthew’s
salary by $142 per month. To acknowledge the promotion and to have the pay be more
commiserate with the increase in responsibility and duties, it is recommended that Mr. Matthew be
placed at pay band 16, step 2. Per BMC 2.50.032(a), City Council must approve the initial salary of a
newly hired person if the starting salary exceeds step 1.
ATTACHMENTS: Letter of engagement and Mr. Matthew’s resume.
FISCAL IMPACTS (Include Budgeted Amount): Position is fully funded.
STUDY SESSION AGENDA: ☒ No Discussion ☐ Full Presentation
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to appoint Kevin Matthew to Information Technology Manager at Pay Band 16 Step 2 rate.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/02/12
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: ACCEPTANCE OF
INTERPRETER GRANT – INTER-LOCAL
AGREEMENT ICA13368
Study Session Date: 12/12/2012
COUNCIL MEETING Date: 12/19/2012
Department: MUNICIPAL COURT
Presenter: DAWN NELSON
Phone: 360 473-5242
SUMMARY: The Bremerton Municipal Court has been the recipient of an Interpreter Grant from the
State of Washington, Administrative Office of the Courts for many years. This agreement is renewed
on a yearly basis. This document is titled an Inter-Local Agreement but it more correctly a grant
acceptance form. The terms of this Agreement are from July 2012 through June 2013 for
reimbursement of interpreter services up to a maximum of $2,841.53.
ATTACHMENTS: Inter-Local Cooperative Agreement – ICA13368 between State of Washington,
Administrative Offices of the Court and Bremerton Municipal Court.
FISCAL IMPACTS (Include Budgeted Amount): Receipt of $2,841.53. No matching funds are
required and there will be no expense to the City.
STUDY SESSION AGENDA: X No Discussion ☐ Full Presentation
STUDY SESSION ACTION: X Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve the Inter-Local Agreement between the City of Bremerton and the State of
Washington, Administrative Office of the Courts and authorize the Mayor to finalize and execute the
agreement with substantially the same terms and conditions as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/02/12
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Public Hearing and Ordinance
No. 5202 to adopt the 2012 Comprehensive
Plan Amendment Docket.
Study Session Date: November 28, 2012
COUNCIL MEETING Date: December 19, 2012
Department: DCD
Presenter: D. McIntyre; A. Daniels
Phone: 360-473-5845
SUMMARY: The action before the Council is to conduct a public hearing to consider the proposed
2012 Comprehensive Plan Amendments. The amendment docket contains: 1) amendments to the
Downtown Regional Center Subarea Plan to include three parcels located at the corner of Burwell
Street and Warren Avenue in the Downtown Regional Center boundaries to be eligible for re-zone to
Warren Avenue Corridor (WC) zoning designation; 2) amendments to the Bay Vista Subarea Plan as
follows: reallocation of Village Commercial and multi-family locations; revise permitted land uses to
reflect land use zones that are being condensed; revise complex Code requirements in Subarea Plan
to more resemble the City of Bremerton Zoning Code; and alter landscaping, signage and parking
requirements which will still comply with overall policies and goals of the existing Bay Vista Subarea
Plan. The two amendment docket items are a result of applications received from interested parties.
ATTACHMENTS:
1) Staff Memo
2) Planning Commission Minutes from July 17, 2012 Planning Commission Workshop;
September 18, 2012 Planning Commission Workshop; and October 9, 2012 Planning
Commission Public Hearing
3) Proposed Ordinance No. 5202
Exhibit A—Planning Commission Findings and Conclusions
Exhibit B—Downtown Regional Center Subarea Plan Amendment
Exhibit C—Bay Vista Subarea Plan Amendment
FISCAL IMPACTS (Include Budgeted Amount): None.
STUDY SESSION AGENDA: ☐ No Discussion ☒ Full Presentation
STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☒ Public Hearing
RECOMMENDED MOTION:
Move to pass Ordinance No. 5202 adopting the 2012 amendments to the Comprehensive Plan.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/02/12
Attachment 1
From: Doug McIntyre, City Planner; Allison Daniels, City Planner
Date: November 28, 2012
Re: 2012 Comprehensive Plan Amendment Docket
EXECUTIVE SUMMARY
Staff and the Planning Commission are pleased to present the proposed 2012 Comprehensive Plan
Amendment docket for Council consideration. State and City statutes allow the Comprehensive Plan
to be amended a maximum of once per year (not including adoption of new Subarea Plans). Each of
the proposed Comprehensive Plan amendments must show consistency with the criteria contained in
BMC 20.10.080.
The Planning Commission conducted a Public Hearing on the amendments and recommends the
Council adopt the changes. The Commission has passed findings and conclusions (See Ordinance
Exhibit A) that demonstrate the consistency with the criteria outlined in BMC 20.10.080, and
includes policies in the Comprehensive Plan to support the proposed changes.
The 2012 Docket includes two amendments as follows:
DOCKET ITEMS
1. On April 2, 2012, Rice Fergus Miller Inc., acting as agent for the property owner,
submitted a request for land use change. Three parcels, located at 1008, 1016, and 1018
Burwell Street (at the corner of Burwell Street and Warren Avenue, see Attachment I),
currently designated Low‐Density Residential, are proposed to be included in the
Downtown Regional Center boundaries. Development in the Downtown Regional Center
is guided by the Downtown Regional Center Subarea Plan (adopted on December 19,
2007 by Ordinance 5034).
The Downtown Regional Center Subarea Plan directs focused, mixed growth according to
the City's Comprehensive Plan vision for downtown as the "Metropolitan Center of the
West Puget Sound." The Subarea Plan includes design standards, zoning, and streetscape
standards for the greater downtown area.
DEPARTMENT OF
COMMUNITY DEVELOPMENT
MEMORANDUM
Attachment 1
The development of the Downtown Regional Center Subarea Plan included a focus on
the Warren Avenue Corridor, located along the west edge of the center. This corridor
was envisioned to provide a commercial district of medium intensity to transition to
lower scaled uses outside of the downtown, as specified by the Warren Avenue Corridor
zone (WC zone). However, implementation of this vision is difficult with the existing
boundaries because the western side of the Warren Avenue Corridor is only one parcel
deep, inhibiting, in many cases, the ability to build medium density uses as specified by
the WC zone. To better implement what was envisioned for this area, a proposal to add
three parcels to the Downtown Regional Center boundaries would allow ample space to
accommodate development intended to occur under the original Subarea Plan.
The three parcels are currently developed with vacant multi‐family residential units and
the current zoning designation is R‐10; the Comprehensive Plan Land Use designation is
Low‐Density Residential. The underutilized nature of the properties presents an
opportunity, if re‐designated, to revitalize the edge of the downtown core by allowing a
redevelopment pattern to occur that the current Low Density Residential designation
does not allow. Impacts on neighboring parcels along Burwell Street are anticipated to
be minimal, due to the sparse nature of development on the block as well as the mix of
existing uses, including single‐family, multi‐family, parking, and undeveloped lots.
Additionally, the WC Zone is intended to provide a commercial district of medium
intensity to transition to lower‐scaled uses outside of the downtown core, which will
ensure that development on the subject parcels will be done in a manner that minimizes
impacts on the surroundings.
Once included in the Downtown Regional Center Subarea Plan, these three parcels will
be eligible for rezoning to the WC zoning designation as set forth in the Subarea Plan. See
Ordinance Exhibit B.
2. The second amendment to this docket is the revisions to the Bay Vista Subarea Plan.
Originally this plan was called the West Park Subarea Plan and was adopted in 2007. In
2009, the applicant, the Bremerton Housing Authority (BHA), revised the subarea plan
and is now known as the Bay Vista Subarea Plan.
The Bay Vista Subarea Plan was created in consultation with stakeholders, residents, and
neighbors. It used an intensive design charette process and numerous community
meetings. Development of the Subarea Plan also used environmental analysis, including
preparation of a SEPA/NEPA environmental Impact Statement (EIS), and an EIS
addendum, to inform master planning of the site consistent with environmental
constraints and opportunities.
However, as the site is being developed, market conditions and site constraints have
made the regulations of the existing Subarea Plan difficult to implement. BHA is
proposing amendments to the Bay Vista Subarea Plan that includes: reallocation of
Attachment 1
Village Commercial and multi‐family locations, revise permitted land uses to reflect land
use zones that are being condensed, revise complex Code requirements in Subarea Plan
to more resemble the City of Bremerton Zoning Code, and alter landscaping, signage and
parking requirements which will still comply with overall policies and goals of the existing
Bay Vista Subarea Plan.
The revised and updated Bay Vista Plan is contained in the proposed Ordinance Exhibit
C.
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Attachment 2
Exhibit A
Exhibit A
Exhibit A
Exhibit A
Exhibit A
Exhibit A
Exhibit C:
Proposed Bay Vista Subarea Plan
Bay V ista
SUB-AREA PLAN
prepared by:
November 2012
bay vista
Bremerton Housing AutHority
Bay Vista suB-a rea Plan
Amendment produced By
BCra
September 18, 2012
bay vista TABLE OF CONTENTSi - introduction
A. Site Location & History .............................................................................................................................................................
B. Sub-Area Plan Vision .................................................................................................................................................................
C. Organization of Sub-Area Plan ..................................................................................................................................................
ii - BAy VistA suB-AreA pLAn
A. Local Planning Framework ........................................................................................................................................................
B. Consistency of the Sub-Area Plan with Bremerton’s Comprehensive Plan ..............................................................................
C. Public/Stakeholder Process ......................................................................................................................................................
D. SEPA/NEPA Environmental Review ...........................................................................................................................................
E. Bay Vista Architectural Review Committee ...............................................................................................................................
iii - BAy VistA suB-AreA pLAn
A. Existing Site conditions .............................................................................................................................................................
B. Sub-Area Plan Vision, Goals and Objectives .............................................................................................................................
C. Sub-Area Plan Elements ............................................................................................................................................................
D. Future Changes to the Sub Area Plan .......................................................................................................................................
iV - Zoning & deVeLopment reguLAtions
A. Land Use Zones .........................................................................................................................................................................
B. General Development Standards ..............................................................................................................................................
C. Streets, Sidewalks And Driveways ............................................................................................................................................
D. Low Impact Development .........................................................................................................................................................
E. Parking Standards .....................................................................................................................................................................
F. Landscape Standards ................................................................................................................................................................
G. Utility Equipment & Storage .....................................................................................................................................................
H. Walls, Hedges And Fences ........................................................................................................................................................
I. Exterior Lighting ........................................................................................................................................................................
J. Sign Standards ..........................................................................................................................................................................
K. Glossary ....................................................................................................................................................................................
L. Intent ........................................................................................................................................................................................
1
1
1
2
4
4
5
8
12
12
13
13
15
17
20
21
21
28
29
31
31
34
44
44
45
45
50
52
bay vista 1 section I : INTRODUCTIONa. site loCation & History
The 83-acre Bay Vista (formerly Westpark) site is
located in West Bremerton, bounded by Kitsap Way
on the north, Oyster Bay Avenue on the east, and State
Route 3 on the west.
The existing Westpark public housing community
was built in 1941 and is owned and operated by the
Bremerton Housing Authority (BHA). The community
is the remnant of a larger World War II – era housing
project that was built as temporary housing for
shipyard workers. The site currently contains 631
residential units, primarily one-story duplex and
four-plex in design, and a 60-unit apartment building
for elderly and disabled residents. Ninety percent or
more of existing units are for low-income families
and individuals. The site also provides community
functions (a community center, senior center, teen
center, and head start facility) and some local services
(laundry, storage facilities, maintenance shop, and
administrative offices. A new 72-unit assisted living
facility (Bay Vista Commons) was constructed and
opened in December of 2007.
The surrounding neighborhood contains a mix
of residential, commercial and industrial land
uses, including auto-oriented and larger retail uses
along Kitsap Way. Kitsap Way in this area serves as
a “gateway” to the City of Bremerton, though it is
currently lacking in definition.
B. suB-area Plan Vision
The Westpark Sub-Area Plan was originally adopted in
2007. The Bremerton Housing Authority (BHA) voted
to change the name of the site and master plan to Bay
Vista in 2008. Consequently, the name of the Sub-Area
Plan has also been changed to Bay Vista as part of the
2009 amendment to this plan. The vision and Sub-Area
Plan for Bay Vista, including the 2009 amendments,
was created in consultation with stakeholders, residents
and neighbors. It used an intensive design charrette
process and numerous community meetings, which
are summarized in Section II. Development of the
Sub-Area Plan also used environmental analysis,
including preparation of a SEPA/NEPA environmental
impact statement (EIS), and two EIS addenda, to
inform master planning of the site consistent with
environmental constraints and opportunities.
The Sub-Area Plan concept is built upon six major
goals:
1. Promoting a mixed-use, mixed-income traditional
neighborhood.
2. Creating a pedestrian-oriented environment.
3. Maintaining/enhancing view corridors and landscaping.
4. Enhancing the civic realm and creating more usable
public open space.
5. Promoting economic development through provision
of commercial activities and services on-site and in the
adjacent Neighborhood Center.
6. Integrating low impact development (LID) approaches
into the Master Plan.
The new Bay Vista is envisioned as an urban mixed-use,
mixed-income, pedestrian-oriented community. It
will be characterized by a variety of types and styles
of housing to meet the needs of a range of income
groups. Accommodating these groups will help to
de-concentrate low-income housing in Bremerton.
Retail and commercial uses will provide for some
of the everyday shopping needs of residents, as
well as provide job opportunities for residents.
The retail center will provide financial support
i - introduction
2 section I : INTRODUCTIONNovember 2012
for implementation of the master plan, including
construction of new infrastructure. Bay Vista's
on-site population will also provide support for
additional commercial activity in the future Oyster Bay
Neighborhood Center.
The site will be sensitively designed to maintain
significant open space and existing trees, to preserve
and enhance views, and to carefully manage
stormwater and other natural features. New parks,
civic spaces and outdoor amenities will be created.
Proposed development standards and Design
Standards, and covenants, conditions and restrictions
(CC&Rs), will establish high standards for the quality
of redevelopment, yet provide flexibility to respond
to market changes and opportunities. The plan will
provide high quality infrastructure and services
to residents. The Bay Vista site will relate to the
surrounding neighborhood in terms of activities and
scale, and provide a catalyst and model for future
redevelopment.
C. organization of suB-area
Plan
The Sub-Area Plan is organized in four major sections.
Following this introduction, Section II describes
the major objectives of the Plan, and its planning
regulatory context within which it has been created.
Section II also delineates the public/stakeholder
process and SEPA/NEPA compliance for the plan
are also described. Section III describes existing site
conditions, and the vision, goals and objectives for
redevelopment of Bay Vista. The major elements
of the Sub-Area Plan–land use, housing, parks and
open space, roads and infrastructure–are described
in narrative and graphics. This section has been
adopted by the City as an element of the Bremerton
Comprehensive Plan. Section IV contains the zoning
and development standards that will apply to Bay Vista,
including regulations for uses, density, building heights,
setbacks and similar components of development.
bay vista 3 section I : INTRODUCTIONVICINITY MAP
4
November 2012Section II : purpose, process & consistencyThe Bay Vista Sub-Area Plan is intended to provide
a road map for future redevelopment of the site.
It articulates the vision, goals and objectives for
redevelopment of Bay Vista, and embodies the policies
of the City of Bremerton Comprehensive Plan, which
it supplements. The Plan also establishes zoning
standards which will guide the preparation of future
site development plans, subdivisions and building
permits by applicants; installation of infrastructure
by the Bremerton Housing Authority (BHA) and
individual developers; and review of these plans
by the City of Bremerton (City) and the Bay Vista
Architectural Review Committee (ARC). The Sub-Area
Plan reflects the Redevelopment Master Plan for Bay
Vista prepared by the Bremerton Housing Authority. It
is also responsive to environmental impacts identified
in Bay Vista environmental documents, to financial
constraints, and to changing market conditions.
The Westpark Sub-Area Plan was initially adopted in
2007. Following additional community involvement,
public hearings and environmental review,
amendments were proposed to reflect the BHA's
ongoing planning, as well as updated information
about site constraints and market conditions. In fall
2008, the BHA received a HOPE VI grant from the
U.S. Department of Housing and Urban Development.
Conditions of the grant include a maximum 54-month
schedule for completion of construction. The Sub-Area
Plan was amended by the City Council in 2009 to
reflect this constraint and other changed conditions
noted previously.
a. loC al Planning
framework
OVERVIEW
The Bay Vista site has been the subject of several City
legislative actions over the past few years and was also
addressed specifically in the City’s recent adoption of
its updated Comprehensive Plan and zoning code in
2004. These actions have provided a framework for
planning redevelopment of the site.
In September 2003, the City amended its Community
Renewal Plan, pursuant to the state Community
Renewal Law (RCW 35.81), to incorporate the site
as a “blighted” area for purposes of community
renewal efforts (Ordinance No. 4830 and 4870). The
designation was supported by findings that the site
was isolated from adjacent areas that building size and
design were deficient, and that physical deterioration
was a contributing factor to disinvestment in the
area. These actions also reaffirmed the City’s intent to
cooperate and assist the Bremerton Housing Authority
in the redevelopment of the site, (pursuant to RCW
35.83), and to provide a framework for redevelopment
in the Comprehensive Plan and zoning regulations.
This framework is described below.
PUBLIC SECtOR REDEVELOPMENt SItE (PSRS)
The Comprehensive Plan Land Use Map designates
Westpark (now Bay Vista) as a Public Sector
Redevelopment Site (PSRS). These are special,
large-scale sites with high potential for development
that is innovative or that meets a unique community
need. They should be developed consistent with
specific district planning efforts that address the site,
compatibility with surrounding uses, and consistency
with the Comprehensive Plan. A PSRS must have a
clearly defined community benefit, such as meeting
a public housing need. They may include mixed
type residential development with an open space
component and secondary commercial or office
development.
ii - BAy VistA suB-AreA pLAn
purpose, process, and consistency with the comprehensive plan
bay vista 5 Section II : purpose, process & consistencyOyStER BAy NEIGHBORHOOD CENtER
The Comprehensive Plan designates a future
Neighborhood Center for the Oyster Bay Area adjacent
to the Bay Vista site, located on both sides of Kitsap
Way. This 37-acre center is projected to redevelop over
time in conjunction with, but slower than, Bay Vista,
and to transition into an urban, pedestrian-friendly
area connected with the surrounding area by trails,
open space, and access to the shoreline. The Center
will include a core, with mixed-use (residential
and commercial) buildings. The Center will receive
economic support from the surrounding neighborhood,
including Bay Vista’s residents and workers; land
uses in Bay Vista are expected to complement
redevelopment of Oyster Bay. A Sub-Area Plan will
be prepared for the Oyster Bay Center; however, the
timing of this planning effort is uncertain.
SPECIFIC AREA PLANS
The Comprehensive Plan anticipates that more detailed
area-specific plans will be developed to implement
Public Sector Redevelopment Sites, such as Bay
Vista. Key aspects of these plans include: a process
that involves the community, consistency with the
Comprehensive Plan goals and policies, and inclusion
of development standards and design standards. The
Bay Vista Sub-Area Plan is such a specific area plan
and has been developed to meet these requirements.
The relationship to the Comprehensive Plan goals is
discussed below.
Revision of the Bay Vista Sub-Area Plan follows
the City's established process for amending the
Comprehensive Plan. This process includes public
involvement, environmental review, and public
hearings by the Planning Commission and City
Council. In cooperation with the City, the BHA
sponsored eight community meetings and workshops
in the fall of 2008 to gain input on proposed changes
to the Sub-Area Plan. An addendum to the Westpark
EIS was also prepared to address the proposed changes.
The revisions were adopted following public hearings
by the Planning Commission and the City Council.
B. ConsistenCy of tHe suB-
area Plan witH Bremerton’s
ComPreHensiVe Plan
BREMERtON COMPREHENSIVE PLAN -
CENtERS CONCEPt
The city’s updated Comprehensive Plan is based on
a “Centers” concept, in which a significant portion of
the City’s future growth will be guided to numerous
Centers designated throughout the City. Centers
vary in scale, function and character, and each is
intended to be a distinct district or “village” with
a unique character. Designated centers range from
the City Center, which provides a wide range of
activities that serve the entire City and the region, to
smaller neighborhood centers, which provide goods
and services, and amenities to residents within a
neighborhood. In general, centers are intended to be
mixed-use, pedestrian-friendly, well-designed areas
with open space, public gathering places, access to
transit, and adequate infrastructure.
SHAPING BREMERtON tHEMES
1. Distinctive Growth, with Viable Neighborhoods and
Centers that Provide Greater Choice and Convenience.
Redevelopment of Bay Vista will help to revitalize
an existing neighborhood that is characterized by
outdated, deteriorated housing and infrastructure,
and has been designated as “blighted.” The new
Bay Vista neighborhood will be characterized by
mixed-use development, a wide range of housing
options affordable to a mix of income groups, ample
open space and amenities, pedestrian accessibility,
quality design, improved infrastructure and enhanced
environmental resources. Everyday goods and services,
and local employment opportunities, will be provided
on-site.
2. Enticing New Development, with a Focus on the
Downtown Regional Center.
The Bremerton Housing Authority has been working
closely with the City and the broader community
to shape a plan for Bay Vista that fits the site
and is responsive to the City’s requirements and
needs, including economic development, housing
6
November 2012Section II : purpose, process & consistencyopportunities and population support for the future
Oyster Bay Neighborhood Center. The City’s updated
Comprehensive Plan and development regulations
provide guidance and flexibility for large public parcel
development proposals like Bay Vista.
3. Supportive transportation, with Seamless, Efficient
and Varied Choices.
Regional transportation facilities bounding the Bay
Vista site include State Route (SR) 3, Kitsap Way and
Oyster Bay Avenue. Access to the site is provided by
Oyster Bay Avenue, Sinclair Drive, Arsenal Way and
Sand Dollar Drive.
Kitsap Transit provides public transit service to the
City of Bremerton. Routes No. 24 and 26 serve the Bay
Vista site, with stops along Kitsap Way (Route 24) and
at the Firs Apartments on Oyster Bay Avenue (Route
26).
Kitsap Way has a designated bicycle lane, wide
shoulders, raised sidewalks on both sides, and painted
crosswalks with pedestrian call buttons. The City
of Bremerton has recently upgraded or added new
accessible ramps at various intersections along Kitsap
Way. A mid-block pedestrian crossing is located east of
Oyster Bay Avenue. Oyster Bay Avenue includes raised
sidewalks on one side of the street.
Levels of service at major intersections will meet City
of Bremerton standards.
4. Improved Accessibility, especially for the Pedestrian.
The Bay Vista site is being planned to support multiple
transportation modes, including vehicles (through
adequate access and parking); transit (through higher
urban densities and access to the regional road system);
and pedestrians (by integrating trails and pedestrian
amenities in a mixed-use development pattern).
5. Quality Housing, with Broader Choices.
Existing housing on the site is old and deficient; the
Comprehensive Plan and several City ordinances have
identified the site’s housing as substandard and in
need of revitalization. The redeveloped Bay Vista will
provide approximately 875 housing units in a variety of
types and styles, including single-family attached and
detached (duplexes, townhouses, clustered cottages)
and apartments. Units will be for-sale and for-rent,
market-rate apartments and public housing. All
existing public housing units will be replaced either
on-site (190 units) or off-site, which will be consistent
with the City’s desire to disperse public housing.
6. Business Support, with Increased Opportunity.
Bay Vista will provide local jobs and goods and
services for residents of Bay Vista and the surrounding
neighborhood. Bay Vista’s residents will also provide
market support for existing and new commercial
development in the Oyster Bay Neighborhood Center.
7. Environmental Management, Integrating Natural
Systems.
The plans for Bay Vista include approximately 15
acres of parks and open space, and retain the existing
preserve park; with the exception of this preserve, most
of the site and existing vegetation will be disturbed
or removed in conjunction with site grading and
construction. When complete, Bay Vista will exhibit
ample landscaping and open space. This open space
and vegetation will provide habitat for species of urban
wildlife, as well as recreational opportunities for local
residents. Environmentally critical areas located on
and adjacent to the site (such as wetlands) will be
protected consistent with City regulations. Stormwater
will be controlled and treated consistent with City
requirements.
8. Community Service, Focusing on Assets
Bay Vista will install new infrastructure on the site;
facilities will be provided concurrent with development.
The Bay Vista EIS documents evaluated the service
demands of the new population to help ensure that any
adverse impacts were identified and addressed.
9. Design Review: Advancing Quality Urban Development.
The Bay Vista Sub-Area plan includes development
standards that will apply to all future development on
the site. These standards, and City review of future
applications, will ensure that future development is
of high quality and meets expectations. The BHA has
developed Covenants, Conditions and Restrictions
(CC&Rs) that apply detailed design requirements to
land and buildings throughout the site.
bay vista 7 Section II : purpose, process & consistencyCOMMUNIty CHARACtER GOALS
CC1 ..Demonstrate excellent urban design qualities in new
development.
Redevelopment of the site will replace old, substandard
housing with modern dwelling units, mixed-use
buildings and a village retail center. The Sub-Area Plan
contains design standards that are intended to set high
standard for site and building design.
CC2 ..Assure that new development relates to surrounding
uses and provides for urban livability.
The Bay Vista site is being master planned and will
provide compatibility between land uses through
careful siting, use of open space and buffering, and
transitions between uses of different intensity. Bay
Vista will function as a traditional community, with
a mix of activities that meet the needs of daily life,
connected by streets and trails, and enhanced open
space, urban amenities and high quality design.
The Master Plan also considers land use and scale
relationships to the surrounding community, including
the future Oyster Bay Neighborhood Center.
CC3 ..Provide for a safe, pleasant and rich pedestrian
experience.
Bay Vista will contain approximately 30,000 linear feet
of pedestrian walkways and trails. Streets are designed
to accommodate pedestrians and to make walking safe,
pleasant and convenient. Pedestrian amenities include
landscaping, benches, open space, pocket parks and
lighting.
CC4 ..Promote the development of areas of special
character, encouraging a diversity of communities within
the city.
Bay Vista is a large site that presents unique
redevelopment opportunities. Its history and status
as a 1940s-era public housing project with aging
and substandard facilities sets the stage for its
transformation into a modern, well-designed urban
mixed-use community located at a major entrance to
the City.
LAND USE GOALS
LU1 ..Identify and enhance distinctive neighborhoods,
communities and centers throughout the City.
As noted above, Bay Vista will be transformed into a
modern, well-designed urban mixed-use community.
It will be distinct in appearance and character in the
City’s existing fabric. It will also provide long-term
population support for future development of the
Oyster Bay Neighborhood Center.
LU2 ..Integrate an open space system into the land use
pattern that increases the amount of open space, protects.
Bremerton’s natural resources, and provides a source of
beauty and enjoyment for all residents.
The Bay Vista plan includes approximately 15 acres of
parks and open space that is integrated into the land
use pattern. Significant trees will be retained to the
greatest extent feasible or replaced. The open space
plan includes areas for active recreation – including
ball-fields, pocket parks, tot lots and gathering
places – and for gathering and passive enjoyment. A
management plan will be prepared and implemented
for the Preserve, a large natural area. Residents will be
involved in overseeing preservation of this area.
LU4 ..Provide for walkability throughout Centers and
neighborhoods.
Bay Vista is intended to be a walkable community,
and has integrated the needs of the pedestrian into its
land use pattern and transportation system. The plan
includes approximately 30,000 linear feet of pedestrian
paths and trails, connecting areas of the site with one
another and with the surrounding neighborhood.
LU5 ..Designate neighborhood, district, and employment
Centers on the Land Use Map that provide mixed-use
environments which serve as the primary focus for growth.
The Comprehensive Plan anticipates that retail and
service uses will be provided in Bay Vista as well as
in the future Oyster Bay Neighborhood Center. Bay
Vista will provide a residential population that will
support commercial uses planned on-site and in the
Neighborhood Center.
LU7 ..In order to encourage new development to occur in
locations and patterns consistent with the Vision(s), Goals
and Policies of this Plan – specifically in Centers – remove
or revise existing land use designations that would sit
multi-family uses in locations that do not support the
Centers Concept.
8
November 2012Section II : purpose, process & consistencyBay Vista includes a mix of multi-family and
single-family housing. The proposed location of multi-
family housing adjacent to Kitsap Way will support
commercial activities anticipated on-site and in the
Oyster Bay Neighborhood Center.
LU11 Provide for the viability of communities,
neighborhoods, and Centers through strategic land use
designations and infrastructure provisions.
The Comprehensive Plan Land Use Map designates
Westpark (now Bay Vista) as a Public Sector
Redevelopment Site (PSRS). This designation
recognizes its public ownership and the public interest
in innovative redevelopment that meets community
needs. The master plan has been developed through
a Sub-Area Planning process, will be compatible with
adjacent uses, and will provide a variety of housing
types and ownership options that will meet a variety of
housing needs.
LU12 Support community-wide access to amenities and
services.
Bay Vista will provide open space and recreational
amenities that are available to all community residents.
The site has also been planned to maintain and enhance
views of the water.
LU17 Adopt and implement appropriate standards and
regulations for stormwater management. the City of
Bremerton should adopt and implement regional plans,
strategies, and standards as appropriate, including but not
limited to the Seattle/King County Storm Water Manual,
FEMA maps, and the Puget Sound Action team’s 2000
Water Quality Plan.
Stormwater will be managed in a manner consistent
with city standards.
C. PuBliC/stakeHolder
ProCess
The Bay Vista Sub Area Plan reflects the efforts of many
people, including: city leaders and staff, the many
citizens and Bay Vista residents who turned out for an
initial program of public community meetings and a
week-long design charrette, urban designers, architects,
traffic planners, civil engineers, environmental
specialists, and market consultants, to name a few.
A second round of meetings and forums were held
to discuss revisions to the Sub-Area Plan based
on updated information about the site and market
conditions.
Community meetings were advertised through a
combination of mailed and published notices, posted
signs, and newsletters. Bay Vista residents, neighbors
within 300 feet, and the community at large were
invited to participate in the process. All residents
of Bay Vista and within 300 feet of the site received
written notices and invitations
The public process conducted for the initial adoption
of the Sub Area Plan included the following outreach
efforts and comment opportunities:
Four public community meetings:
• March 16, 2006• May 12, 2006• June 22, 2006 (EIS scoping included)
• September 14, 2006
A week-long design charrette:
• May 8-12, 2006
two stakeholder’s meetings:
• April 19, 2006
• July 13, 2006
SEPA/NEPA scoping meetings and EIS meetings:
• June 22, 2006
Bremerton Planning Commission workshops
and public hearings:
• October 17, 2006
• November 21, 2006
Bremerton City Council public hearings and
meetings:
• January 24, 2007• February 7, 2007
bay vista 9 Section II : purpose, process & consistency
At each of the meetings, the current status of the design
process was presented, and attendees were invited to
comment on the design, and to ask questions about
the project and the process. The goal of the stakeholder
process was to create a vibrant neighborhood
that reflects multiple public objectives, with the
participation and support of the community as a whole.
The content of the public meetings were as follows:
Community Meeting #1: March 16, 2006
West Hills Elementary School Gymnasium
This meeting included presentation of the existing
conditions on the Bay Vista site, along with the
proposed process for redeveloping the site. Goals
and possibilities for the site were presented, and an
invitation for the public to participate in the process
of creating the Sub-Area Plan document. The timeline
and process for the project were presented, and a
question and answer session followed.
Questions from attendees, mostly existing Westpark
residents, were focused on the relocation plan,
demolition, and future rent levels for the replaced
subsidized housing.
Stakeholder’s Meeting #1: April 19, 2006
Westpark Community Center
This meeting included presentation of the existing
conditions on the Westpark site, along with the
proposed process for redeveloping the site specifically
geared toward those neighboring businesses and
agencies affected by the Westpark redevelopment.
Retail and commercial components of the project
were presented, with a discussion of potential impact
to surrounding businesses. The timeline, process and
current status of the project were also presented, with a
question and answer session following.
Questions from the stakeholders included the following
topics: project financing; whether land will be sold as a
large block or in individual lots; the anticipated income
of future residents; use of design standards; ability
to rent units, housing for residents not returning to
Westpark; and the type of retail development that will
face Oyster Bay Avenue.
Community Meeting #2 (Design Charrette):
May 8-12, 2006 – Westpark Community Center
At the Design Charrette, the public had the opportunity
to interact directly with the design team over the
course of a week while the design was in process,
allowing true public input. Each night (with the
exception of Thursday) during the charrette there
was a presentation and question and answer session,
outlining the day’s progress. On the final evening, all of
the drawings were presented, including the preferred
site plan, which was generated through input from
each of the agencies and stakeholders involved, along
with the many members of the local community that
participated. This final presentation served as the
“official” public meeting component of the charrette,
and was followed by a question and answer session.
Questions raised at the meeting addressed the
following topics: replacement of existing streets;
density of housing; noise; availability of units for the
disabled; phasing of construction; grading of the site;
storm water management; sale of lots to individuals.
Community Meeting #3: June 22, 2006
Westpark Community Center
This meeting included presentation of the EIS process,
along with the proposed process for the environmental
approval process. A question-and-answer session
specific to the EIS was held, followed by an update of
the overall design process for the site. There was an
additional opportunity for questions and answers after
the design process update.
Questions and comments addressed the following
topics: fill proposed for the existing ball field and
potential seismic event; timing of construction;
communication with residents about project progress;
impacts on existing wildlife; questions about the
10
November 2012Section II : purpose, process & consistencyrelocation process; kinds of future businesses; lighting;
water features; BHA ownership of housing; whether
there will be multiple builders for the for-sale housing;
and name of the new community.
Stakeholder’s Meeting #2: July 13, 2006
Westpark Community Center
This meeting was geared toward the stakeholders
and included an update on the design process for
redeveloping the site. Timelines for relocation of
the current Westpark residents and construction
were presented, with a question- and-answer session
following.
Questions from the stakeholders included the status
of the grading design; and status of the stormwater
system.
An additional series of informational meetings and
forums was held in September-October 2008 in
connection with proposed revisions to the Sub-Area
Plan.
Community Meeting #1: September 25, 2008 – Westpark
Community Center
The kick-off meeting included a summary of the
plan revision process, the topics and schedule of
subsequent community meetings, and major changes
being considered to the sub-area plan/master plan. The
recently awarded HOPE VI grant was also described.
As summarized, the basic concepts of the master
plan for the community, recently renamed Bay Vista,
would remain the same: a mixed-use, mixed-income,
pedestrian oriented community, with ample open
space and landscaping, modern infrastructure and
high quality design. Proposed changes to the master
plan are motivated primarily by changing real estate
market conditions, and project financing needs. Major
changes to the master plan being discussed include the
following:
• a slight increase in the number of housing
units, but the same number of low income units
dispersed throughout the community;
• an expansion and intensification of the retail
center, potentially incorporating the existing fire
station site;
• demolition of the existing community center and
development of a smaller community center on a
corner of the ball field;
• the same amount of parks and open space;
• noise mitigation walls adjacent to SR 3; and
• investigation of additional low impact design
techniques for stormwater management.
Based on conditions of the HOPE VI grant,
construction will need to be completed by 2013 (54
month maximum from grant award).
A question and answer session followed the
presentation. Questions addressed the following topics:
location of a new fire station; whether the fire station
site be used as a maintenance facility rather than for
commercial use; how secure the HOPE VI grant funds
are in view of recent national economic events; what
the HOPE VI funds can be used for; whether there
will be a homeownership program; whether off-site
property will be condemned by the City; the new
phasing program; tree preservation; the design and
character of the new commercial center; and numerous
questions related to the on-going tenant relocation
program.
Community Meeting #2: October 2, 2008 – Westpark
Community Center
The second meeting of the series focused on the
changes to the commercial piece of the redevelopment
known as Sector 5. Mel Maertz from Olympic
Associates made a power point presentation which
showed the conceptual sketches of what the new
commercial could look like. Slides also showed possible
elevations for a grocery, an inn and residential.
Two community members and a potential commercial
tenant attended this meeting.
Community Meeting #3: October 9. 2008 – Westpark
Community Center
The third meeting was a discussion of the civil
engineering changes. The outline for this meeting was:
1. Introduction
a. Why are we going through this process
bay vista 11 Section II : purpose, process & consistency2. Site Overview/Changes
a. Changes in roadway layout/alleys
b. Changes in open space
c. Changes in Stormwater Management Areas
3. Grading
a. Site constraints
b. Overall idea/slope reduction
c. Majors areas of cut and fill
4. Stormwater Management
a. Drainage Basins
b. Outfall
c. Conveyance systems
5. Low Impact Development
a. Pervious Pavement
b. Conveyance Swales
c. Roof Downspouts
d. Filterra
6. Street Sections
a. Possible Options
7. Closing
a. Next Steps
Justin Goroch from BCRA Engineering was the
featured speaker. Questions were fielded from the
audience with most of the questions centering on our
use of Low Impact Development.
Community Meeting #4: October 16, 2008 – Westpark
Community Center
The fourth meeting was a presentation of what the
new replacement housing in the new Bay Vista will
look like. Presentations were made by Tonkin Hoyne
complete with a power point presentation of what the
replacement public housing would look like and Ross
Deckman + Associates with schematics of what the
multifamily apartment and manor houses would look
like.
The tenants in the audience asked questions such
as what amenities would the units have. Responses
comparing and contrasting the current housing with
the new housing were well received.
Community Meeting #5: October 23, 2008 – Westpark
Community Center
The following agenda was used for this meeting:
Guest Introduction:
Greg Brower; Landscape Architect
of Berger Partnership
Mel Maertz; Architect
of Olympic Associates Company
Sub- Area Plan: Landscaping & Site Amenities
A. Streetscape
B. Parks
C. Open Space
D. Club House
E. Residential Landscape
The presenters showed visuals of what the new parks
and open spaces would look like. They also showed
a schematic design of a new community club house.
Audience comments were primarily about the use of
existing trees and new plantings.
Community Meeting #6: October 30, 2008 – Westpark
Community Center
This final meeting was a wrap up and summary of the
previous 5 meetings. We reviewed the contents of the
previous weeks’ presentations and fielded any audience
questions that may have come up over the course of the
6 weeks.
No issues were left outstanding and no official
comments have been received.
More detailed documentation of the public process is
on file with the City of Bremerton.
Stakeholder Meeting: June 21, 2012 – Summit at Bay Vista
Tenants and community partners were present to
review the proposed changes to the Sub Area Plan.
Responses were all supportive of the plan.
Stakeholder Meeting: June 25, 2012 – BHA Administrative
Offices
BHA staff was present to provide an overview of
proposed changes to the Sub Area Plan. There were no
other attendees at the meeting.
12
November 2012Section II : purpose, process & consistencyd. sePa/nePa enVironmental
reView
The review process for the proposed re-development
of Westpark, and the initial adoption of the Sub-Area
Plan, included preparation of an Environmental
Impact Statement (EIS) to comply with the National
Environmental Policy Act (NEPA) and the State
Environmental Policy Act (SEPA). The City also
prepared an EIS Addendum for the initial adoption of
the Sub-Area Plan. The purpose of an EIS is to present
information about the environmental consequences
of proposals, including redevelopment projects, to
consider alternative courses of action, and to mitigate
environmental impacts that are avoidable. This analysis
helps ensure that decision makers are aware of impacts
to the natural and human environments, and that they
consider opportunities to mitigate impacts. The process
also provides opportunities for interested agencies,
tribes and citizens to comment on proposals and to be
involved in their consideration.
A single EIS was prepared to satisfy NEPA and SEPA
requirements. The City of Bremerton, designated as the
Responsible Entity (RE) for NEPA compliance, served
as the NEPA lead agency. Compliance with NEPA was
required because the project involved federal action, by
the Department of Housing and Urban Development
(HUD), to use federal funds in redeveloping the site.
The Bremerton Housing Authority acted as the lead
agency for SEPA compliance. Scoping occurred in
June 2006. A Draft SEPA/NEPA EIS was published in
March 2007. Public meetings on the Draft EIS were
held in April 2007. A Final EIS, responding to public
and agency comment, was published in May 2007. All
meetings were advertised consistent with state and
federal requirements. Notices of the publication of EIS
documents were similarly published consistent with
SEPA and NEPA requirements. An Environmental
Review Record (ERR) was prepared to comply with
NEPA and is on file with the City of Bremerton. An
addendum to the EIS was prepared in 2008 to address
changes to the Sub-Area Plan.
e. Bay Vista arCHiteCtural
reView Committee
All new development proposals will adhere to the
development review, permitting and design approval
processes of the City of Bremerton and the Bay Vista
Architectural Review Committee (ARC). ARC planning
and design standards are identified in the Sub-Area
Plan. Covenants, Conditions & Restrictions (CC&R’s)
will also apply to all property on the site that is sold for
redevelopment, to help ensure that all proposals meet
relevant requirements.
The Bremerton Housing Authority has contracted
with a development consultant who is responsible for
all development within the boundaries of the project
site. The development consultant will assemble an
ARC responsible for the review and approval of all
permit applications prior to their submittal to the City
of Bremerton. Upon approval the ARC will issue a
certificate that will be required to be included with the
submittal to the City. Permit applications will not be
accepted by the City without the approval of the ARC.
The City will maintain its primary authority to review
and approve plans for consistency with zoning and
development standards, and building requirements, as
required by law. In particular, the Architectural Review
Committee will ensure that proposed development
is consistent with the intent and specifics of CC&R’s
adopted for the Bay Vista site.
bay vista 13 section III : Sub-Area planiii - BAy VistA suB-AreA pLAn
a. existing site Conditions
DRAINAGE
Stormwater within the site is conveyed by overland
flow and through a rudimentary system of open
ditches and enclosed drainage pipes. Outside of the
project area, stormwater is conveyed away from the
site in open ditches and enclosed drainage systems.
Stormwater from the on-site area combines with
stormwater from off-site areas in the conveyance
systems outside of the project area. There are no known
sources of off-site stormwater that is routed through
the existing drainage system.
There are no known existing water quality treatment
facilities within the Bay Vista site. Stormwater
treatment for the redeveloped conditions on the
overall site will be provided in accordance with Title
15.04.042 of the City’s municipal code. Water quality
treatment and flow control facilities will be designed in
accordance with the City of Bremerton Public Works
and Utilities Standards, using Department of Ecology
(Ecology) hydrologic simulation software to calculate
flow rates and volumes
Currently, most of the site discharges through two
existing outfalls into Oyster Bay. Small portions
in the Southeast and Northwest corners of the site
discharge to existing Washington State Department
of Transportation storm drainage systems ultimately
flowing to the Sinclair Inlet and Ostrich Bay Creek.
Low Impact Development (LID) techniques, including,
but not limited to, pervious pavement, raingardens,
bioswales, and roof drain dispersion will be utilized to
the greatest extent feasible to treat stormwater and help
control flows from the site.
tRANSPORtAtION
Regional transportation facilities bounding the Bay
Vista site include SR 3, Kitsap Way and Oyster Bay
Avenue. SR 3 is a four-lane, north-south freeway serving
Central Kitsap County. Kitsap Way is a five-to-seven
lane, limited access, principal arterial that connects West
Bremerton to Central Kitsap County (via SR 3). SR 3
and Kitsap Way intersect just northwest of the Bay Vista
site. Access to the site is provided by Oyster Bay Avenue,
Sinclair Drive, Arsenal Way and Sand Dollar Drive.
Kitsap Transit provides public transit service to the
City of Bremerton. Routes No. 24 and 26 serve the Bay
Vista site, with stops along Kitsap Way (Route 24), at
the Firs Apartments on Russell Road (Route 26) and
within the Bay Vista site. Service on both routes has
one-hour headways.
Kitsap Way has a designated bicycle lane, wide
shoulders, raised sidewalks on both sides, and painted
crosswalks with pedestrian call buttons. The City
of Bremerton has recently upgraded or added new
accessible ramps at various intersections along Kitsap
Way. A mid-block pedestrian crossing is located east of
Oyster Bay Avenue. Oyster Bay Avenue includes raised
sidewalks on one side of the street.
Two intersections of Kitsap Way – at Oyster Bay
Avenue and Pershing Avenue – have relatively high
accident rates (based on the last three-year average)
Existing levels of service at major intersections meet
City of Bremerton standards. Those experiencing the
highest delays are Kitsap Way at Marine Drive, and
Kitsap Way at the SR 3 southbound ramps.
CRItICAL AREAS
The Bay Vista site does not contain wetlands or streams,
based on preliminary analysis. These resources are
presently adjacent to the site, however, and on-site
activities (e.g., stormwater runoff) will need to be
managed to protect off-site water quality and habitat.
The site’s trees and vegetation provide a valuable
environmental and visual amenity, but do not provide
habitat for designated threatened, endangered or
sensitive species. Critical aquifer recharge areas are
not present. Some steep slopes do occur and will be
addressed through site planning consistent with City
requirements.
14
November 2012section III : Sub-Area planSUMMARy OF OPPORtUNItIES AND
CONStRAINtS
Based on natural features, site location and expressed
public and private planning objectives, the Bay
Vista site possesses significant opportunities for
redevelopment. There are also a number of constraints
that will be addressed through the sub-area planning
and master planning processes.
• The site’s topography is varied and dramatic.
Three high points within the site will most likely
create beautiful views towards Oyster Bay.
• Bay Vista is bounded by State Road 3 and Kitsap
Way. These two primary roads carry high volumes
of traffic, which creates a perceptible level of noise
within the site.
• A five-minute walking distance (quarter-mile
radius) is often used as a benchmark for planning
traditional neighborhoods. Most of the site, and
portions of the planned Oyster Bay Neighborhood
Center commercial area (along Kitsap Way), are
within convenient walking distance and are
accessible from the surrounding community. Bay
Vista residents will provide economic support for
on-site and off-site services.
• The site is not significantly constrained by critical
areas (e.g., wetlands, streams, fish and wildlife
habitat, aquifer recharge areas). It does contain
some steep slope areas that will need to be
stabilized and carefully engineered.
Figure 2 – Opportunities and Constraints Diagram
bay vista 15 section III : Sub-Area plan• Some mature landscaping and significant trees are
present on the site in the Preserve. These features
are valuable amenities and provide opportunities
for integration into a system of parks and open
space.
B. suB-area Plan Vision, goals
and oBjeCtiVes
The vision of the Bay Vista Sub-Area Plan is to provide
a modern, mixed-use, mixed-income, pedestrian-
friendly and amenity-rich neighborhood for residents,
neighbors and visitors. Redevelopment will create a
particular kind of place, one that provides space for the
community to gather and interact. Streets, plazas and
other public spaces will all be designed with the care
and attention to detail required to make them function
as outdoor public “living rooms” of the new Bay Vista.
The pedestrian-oriented design is reflected in a
clearly defined “main street”, small-scaled blocks, and
pedestrian-scale buildings on landscaped streets.
Public art parks, and stands of significant trees also
contribute to this definition. The Sub-Area Plan’s
overall goals and objectives include the following:
1. Promote a Mixed-use, Mixed-income Neighborhood
• Promote a livable, walkable community through
traditional neighborhood-making principles
• Provide a varied set of housing and lot types to
promote a mixed-income neighborhood
• Encourage development of new neighborhood
retail along Arsenal Way and at the intersection of
Kitsap Way and Oyster Bay Avenue
• Connect to and re-use existing infrastructure
where appropriate
2. Create a Pedestrian-oriented Environment
• Conceal retail parking to enhance the public realm
for pedestrians along the street
• Improve pedestrian and bicycle connections
within and outside of the Bay Vista site
• Encourage the use of public transit
• Provide and enhance trails through existing
wooded and landscaped areas
3. Maintain and enhance existing view landscape and
corridors
• Take advantage of views north to Oyster Bay
• Maintain and enhance trees and landscape along
the south side of Kitsap Way and in the Preserve
• Develop public neighborhood parks and greens
adjacent to existing landscape features and views
16
November 2012section III : Sub-Area plan4. Enhance the civic realm and create more usable public
open spaces.
• Provide outdoor amenities
• Create smaller pocket parks throughout the
neighborhood to promote walkability and security
• Improve and create parks and civic spaces
5. Promote economic development through provision of
commercial activities and services.
• Develop a Village Center that will provide local
jobs, help finance redevelopment of the site, and
generate revenue to the City.
• Provide a full range of services to meet the
everyday needs of local residents.
6. Integrate low impact development approaches into
the site master plan where possible and practical.
• Reduce street widths where appropriate to help
reduce impervious surfaces
• Maintain and integrate open space into the site
plan
• Investigate stormwater design that uses bioswales
and infiltrates stormwater where appropriate
• Use pervious asphalt where soil conditions permit
OPEN SPACE GOALS
• Create parks that enhance the community and
encourage and support social interaction.
• Create open spaces easily accessible to residents.
• Create parks that appeal to a wide range of age
groups. A diversity of park types should be
established to offer a diversity of passive and
active uses.
• Use the ‘eyes-on-the-park’ to create safe active
environments. Lighting, layout and visibility are
key factors in the design of active parks.
Provide trash and recycling bins for the parks that meet
the needs of the users.
• Use resilient materials that reduce maintenance
costs.
• Increase community participation through direct
access for residents from their homes to adjacent
parks.
• Create public viewing areas.
• Provide for an urban trail through the natural area
and along Kitsap Way.
• Provide for wildlife through preservation and
enhancement of the natural area.
Bay Vista’s landscape will also serve to enhance the
site’s architecture and relate to the local environment.
The topography of the site allows for varied
relationships of architecture and landscape, which will
help distinguish sub-neighborhoods from each other.
Open and accessible outdoor spaces and convenient
seating will encourage human interaction and create a
safe and visible environment for children. Pedestrian
bay vista 17 section III : Sub-Area planscale lighting will enhance the streetscape, alleys and
parks. Narrower streets will calm traffic and protect
pedestrians.
C. suB-area Plan elements
The Bay Vista Sub-Area Plan addresses the following
elements:
1. Land Use, including the master site plan map and
identification of major land uses.
2. Housing, including the expected number of for-sale,
rental, market-rate and low-income units; and planned
densities.
3 Open Space, landscaping and amenities.
4. Roads and Infrastructure, including vehicular and
non-vehicular circulation systems, storm water
management, and site utilities.
Bay Vista will be a mixed-use, mixed-income
community drawing on the best of traditional
neighborhood design and the rich history of
Bremerton, while employing modern amenities and
taking advantage of the topography, landscape and
views. The intent is to build a warm community, where
neighbors interact and walk on beautiful tree-lined
residential streets, and where pedestrian circulation
is emphasized. The areas of the site where retail is
proposed will be designed to be lively and energized.
The Land Use Plan is loosely based upon a grid of
interconnected streets that provide multiple routes
to any destination. This configuration allows easy
pedestrian and vehicular circulation throughout the
neighborhood by spreading out traffic loads. Sidewalks,
street trees, and appropriately scaled street lights and
furniture will provide richly detailed streetscapes.
A unique sense of place will be created through the
arrangement of vibrant public spaces, a clear hierarchy
of pedestrian-friendly streets, a balanced program of
residences, retail services, offices, community buildings
and spaces, as well as an architecture that responds
to the northwest vernacular. Buildings that line public
spaces will enclose and frame the public realm, and
connect to one another at the scale of the pedestrian.
Foremost, Bay Vista will be a residential community,
offering numerous types, styles and sizes of residential
units types, at varying densities, to meet the
community’s housing needs and to accommodate
a spectrum of income groups. The heart and center
of the community will be the Bay Vista Preserve, a
large open space that will provide opportunities for
active recreation and passive enjoyment of significant
vegetation. Residential neighborhoods will line the
park. Smaller parks and open spaces will be located
throughout Bay Vista’s neighborhoods and plazas, and
more “urban” spaces will be co-located.
Different land uses will be arranged compatibly in
distinct neighborhoods, and in mixed-use buildings,
some of which will have plazas and other urban open
spaces. The site’s more intensive land uses including
larger high density residential buildings, and a retail/
commercial village – will be located along the site’s
outer edges, closer to (but buffered from) major
arterials. All of the site’s activities, however, will be
within a convenient walk or bike ride via Bay Vista’s
system of paths and trails.
1. LANd USE
The general arrangement and location of land uses in
Bay Vista are shown in Figure 4, which indicates the
planned, general locations of proposed land uses.
Mix of Land Uses
The planned mix of land uses will create a vibrant,
attractive and functional community.
Residential uses including single-family attached and
detached in a variety of designs, and multi-family
will predominate. Retail and service uses will also be
provided to meet the everyday needs of residents; these
activities will support the more diverse, larger scale
commercial activities occurring along Kitsap Way,
in the designated Oyster Bay Neighborhood Center.
Retail/commercial and residential may occur in mixed-
use buildings. More intensive and larger-scale land uses
(retail, commercial, and larger multi-family buildings)
will generally be located closer to the site’s boundaries,
transitioning to residential and open space uses in
more central portions of the site.
Density
The allowable gross density based on preliminary
18
November 2012section III : Sub-Area planVILLAGE COMMERCIAL
MULTI-FAMILY/
SENIOR HOUSING
OPEN SPACE PARKS
MULTI-FAMILY/MIXED USE
LOW OR MEDIUM
DENSITY RESIDENTIAL
FIGURE 4 - LAND USE PLAN
LEGEND
Figure 4 – Land Use Plan
bay vista 19 section III : Sub-Area planplat approval is approximately 12 dwelling units per
acre. Individual projects must be within the range
that is specified for the type of residential unit in the
Sub-Area Plan’s development standards. Variations in
density are anticipated throughout the site, subject to
the limits in the development standards.
2. HOUSING
Housing Program
Bay Vista will include a mix of for-sale and rental units,
and market-rate and public/low-income units.
Low-income units will be developed at Bay Vista and
will include a mix of residential housing types.
3. OPEN SPACE ANd PARkS
Approximately 15 acres of the Bay Vista site will be
devoted to various types of parks and open space.
As shown on Figure 4, open space and parks will be
distributed across the site. Together, they express Bay
Vista’s environmental sensitivity, its desire to enrich
the health of the community and the individual,
and to establish the character of the neighborhood.
Landscaping and preservation efforts also offer
opportunities for education. School and conservation
programs, community work parties and stewardship
opportunities will involve residents in preservation
and enhancement of their natural environment. Native
wildlife will also provide a vital connection with the
environment.
The Bay Vista Preserve is an approximately 10 acre
natural open space that will be preserved in a natural
condition. The BHA has conducted a tree survey to
identify all significant trees. Low impact trails and
limited improvements will also be considered.
4. ROADS AND INFRAStRUCtURE
Roads & Pedestrian Circulation
Bay Vista’s thoroughfare system – streets, sidewalks and
pedestrian paths, shown in Figure 4, is a fundamental
element in site design, and will connect areas of the
community to each other and to the surrounding
neighborhood. The street design promotes pedestrian
circulation, while maintaining automobile access
for residents and visitors. The street layout provides
multiple paths to each home and business, and reduces
congestion by distributing traffic across the site.
The design and dimensions of major types of streets
are addressed in Section IV of the plan, "Zoning &
Development Standards." In general, streets utilize
narrower widths to reduce impervious area and
to slow vehicle speed. Alleys are used for access to
private parking for automobiles to preserve the desired
pedestrian-orientation of the streetscape and front
façades of residential structures. Basic streets types
include the following:
Neighborhood Streets – One-lane or two-lane roads
(varying among neighborhoods) with on-street parallel
parking. Sidewalks of varying width are provided on
both sides of the street. These streets are lined with
trees and include landscaping between the street and
Table 1 – Bay Vista Land Use
Land Use Zone Area (acres)Maximum Density
Multi-family/Mixed Use 11 Up to 65 d.u./acre
Multi-family/Senior Housing 6 Up to 65 d.u./acre
Village Commercial 14 N/A
Open Space 15 N/A
Residential 21 Up to 38 d.u./acre
Streets 16 N/A
t O tAL 83 Up to 12 d.u./acre
Notes:
(1) See table A-1 for density and dimensional standards.
20
November 2012section III : Sub-Area planthe sidewalk.
Bay Vista Boulevard – Provides access to the regional
transportation system, is designed as a wider, tree-lined
street with two traffic lanes, on-street parking and
sidewalks on both sides.
Alleys – Provides access to garages for parking and
for deliveries and services for Single- Family Attached,
Single-family Detached, and other unit types.
Pedestrian Paths and “Green Streets” – These are
separate from vehicle traffic and provide pedestrian-
only between Bay Vista streets, connections between
Bay Vista neighborhoods, parks and open spaces, retail
activities and services. These paths will also connect to
the off-site regional trail system.
Infrastructure
Bay Vista will be redeveloped with all new utilities
and infrastructure, including sewer and water systems
and stormwater management. Stormwater systems will
include water quality treatment, which is not currently
provided on the site. Low Impact Development (LID)
approaches for stormwater management, including
the use of pervious pavement in some street sections
are being pursued in preliminary engineering and
design. If feasible economically and geotechnically,
this approach could increase infiltration of stormwater,
recharge of groundwater, and could potentially reduce
runoff below existing levels. Upgrading of the existing
Oyster Bay outfall may not be necessary, in this case, to
accommodate flows from Bay Vista.
d. future CHanges to
tHe suB area Plan
The Bay Vista Master Plan and Sub-Area Plan are
evolving documents and will change incrementally
over time in response to changing regional economic
conditions, and to ongoing planning, design,
environmental review, public involvement and local
decision-making. A degree of flexibility is inherent
in large-scale, phased master plans; this flexibility is
desirable to provide the ability to respond to changes in
demographic, economic and market patterns over time.
The initial Sub-Area Plan map, adopted in 2007,
reflected the conceptual master plan for the site at
that time and stage of planning. Some proposed
land use designations allowed flexibility in uses, and
contemplated that changes could be proposed in
the future. For example, it was recognized that Bay
Vista’s on-site population and financial requirements
could support and/or require additional compatible
retail development on the Bay Vista site. Additional
retail development was incorporated in the revised
Master Plan and Sub-Area Plan. Any significant
changes to the conceptual land use map requires
thorough consideration through a public review
process, including review and action by the Planning
Commission and City Council to amend the
Comprehensive Plan. Appropriate environmental
analysis is also required. Any changes also need to
be consistent with the Sub-Area Plan’s goals and
development standards. Such changes were proposed
in 2008 to modify the Sub-Area Plan's boundaries,
increase the number of residential units slightly, and
to increase the size and intensity of on-site commercial
uses.
bay vista 21 section IV : ZONING & DEVELOPMENT REGULATIONSa. land use zones
This section of the Sub-Area Plan contains the
zoning and development standards that will guide
the redevelopment of Bay Vista and will implement
the requirements of the site’s zoning designation. The
standards address the following elements:
Land uses/zones, including density, height, setbacks,
building coverage and impervious surface coverage;
• General development standards;
• Building design;
• Streets, sidewalks and driveways;
• Parking;
• Landscaping;
• Parks and open space;
• Signs.
Design standards are reviewed for conformity by the
ARC, as discussed in Sec. III.
The current zoning classification for the Bay Vista site
is Master Development (MD) [Chapter 20.80 BMC].
The MD zone is applied to sites envisioned for large-
scale planned development. These proposals must meet
a public need and provide a community benefit, such as
redeveloping “blighted” areas or providing affordable
housing opportunities. Projects may be proposed by
public entities or public-private partnerships, and
should result in innovative development.
Proposals in the MD zone are required to prepare a
Master Development Plan (MDP), which includes
standards for development of the site, including uses,
density, setbacks, lot coverage and heights. Other
required components of an MDP, which are addressed
in these regulations, include the following:
• An open space plan that protects natural resources
and provides recreational opportunities;
• Site edge design that is compatible with adjacent
uses and densities;
• Streetscapes that include amenities, (street trees,
planting strips, benches, street lighting, etc.) and
other design features that make streets interactive,
walkable and enjoyable;
• A general landscape plan, including preservation
of significant trees where possible;
• Adequate off-street parking, which may modify
standard requirements if a parking study
demonstrates no impact on adjacent properties.
1. LAND USE & DIMENSIONAL StANDARDS
Land uses within Bay Vista and applicable dimensional
standards are identified in Table A-1, Density and
Dimensional Standards and Figure A-2, Land Use Map.
2. RESIDENtIAL
Intent: The intent of the residential (R) zone is to
accommodate a variety of housing types at varying
densities consistent with creation of a mixed-income,
mixed-use pedestrian-oriented community. Housing
types may include single-family attached and detached
in a variety of styles. Multi-Family housing may also
occur in mixed-use buildings.
Residential standards shall be in accordance with the
standards of BMC 20.60 with the following additions
and/or revisions:
i. Permitted Uses and Density
a. Permitted Uses
(i) Provided that they are consistent with the
intent of the Zone, all uses are permitted
outright, provided that the Development
Standards specified in Section IV are satisfied.
The applicant shall bear the burden of proving
that a proposed use achieves the stated intent
of the particular zone.
b. Use Definitions
(i) Definitions of the specific land uses are found
in BMC Chapter 20.40.
c. Decision Authority
(i) A use determination made by the Director
may be appealed to the Hearing Examiner
iV - Zoning & de VeLopment reguLAtions
22
November 2012section IV : ZONING & DEVELOPMENT REGULATIONSVILLAGE COMMERCIAL
MULTI-FAMILY/
SENIOR HOUSING
OPEN SPACE PARKS
MULTI-FAMILY/MIXED USE
LOW OR MEDIUM
DENSITY RESIDENTIAL
FIGURE 4 - LAND USE PLAN
LEGEND
Figure A-2 – Land Use Plan
bay vista 23 section IV : ZONING & DEVELOPMENT REGULATIONSfollowing a Type II decision process as set forth
in BMC Chapters 20.02 and 20.40
ii. Dimensional Standards: Standards for height, setback,
yards, building coverage and site coverage shall be
consistent with Table A-1.
iii. Public Space Requirements
the following public space requirements to residential
development:
a. Pedestrian-oriented spaces, amenities and corridors
shall be incorporated in the overall site design.
b. Pedestrian areas shall be easily accessible, clearly visible
and located to take advantage of surrounding features
such as building entrances, open spaces, significant
landscaping, unique topography or architecture, and
solar exposure.
iv. Development Standards:
a. Residential building density, height, yards/setbacks,
building coverage and site coverage, shall be consistent
with the standards in Table A-1.
b. Garages & Integral Garages:
(i) Integral garages incorporated into residential
structures should not face the street, except for
lots not served at the rear by alleys. Where garage
doors facing the street are permitted, they should
be set back from the front facade, and should
contain at least 25% glazing. Driveways shall be
a minimum length where any vehicle parked in
front of the garage shall not protrude onto the
sidewalk.
c. Landscaping: Landscaping shall meet the requirements
of Subsection G of these regulations.
d. Building Orientation and Design Elements:
(i) Residential: When located at block corners,
buildings shall have two primary facades
(composed of the same materials) that are
oriented to the two streets.
v. Fire Protection Systems:
Due to the road widths proposed in this plan, all
residential units shall be protected by a fire-sprinkler
system.
vi. Lot Standards
a. Residential: minimum lot width shall be 30 feet.
3. MIxED USE
Intent: The intent of the Mixed-Use zone is to
further the goal of creating a traditional, mixed-use
pedestrian-oriented community by allowing a
complementary mix of residential and non-residential
uses to locate within the same building or stand alone
multi family buildings.
Mixed-Use standards shall be in accordance with the
standards of BMC 20.60 with the following additions
and/or revisions:
i. Permitted Uses and Density:
a. Provided that they are consistent with the intent of the
Zone, all uses are permitted outright except those uses
listed prohibited in Section IV.A.3.ii, and provided that
the Development Standards specified in Section IV are
satisfied. The applicant shall bear the burden of proving
that a proposed use achieves the stated intent of the
particular zone.
ii. Prohibited Uses:
The following uses are prohibited:
a. Adult entertainment
b. Automobile sales
c. Light and heavy industrial/manufacturing uses
iii. Dimensional Standards
a. Standards for setback, yards, building coverage and
site coverage are indicated in Table A-1, Density &
Dimensional Standards.
iv. Public Space Requirements
a. Pedestrian-oriented spaces, amenities and corridors
shall be incorporated in the overall site design.
b. Pedestrian areas shall be easily accessible, clearly visible
and located to take advantage of surrounding features
such as building entrances, open spaces, significant
landscaping, unique topography or architecture.
c. Delineate pedestrian areas through the use of different
paving materials, scored paving surfaces, built-in
planters, landscape areas and freestanding site
furniture.
v. Development Standards
Site development shall be in accordance with the
standards of BMC 20.66.060 with the following
24
November 2012section IV : ZONING & DEVELOPMENT REGULATIONSadditions and revisions:
a. Buildings should be arranged to facilitate integration
and use of plazas, courtyards, and greens.
b. Sites should be designed to create an identifiable
pedestrian urban character. Methods to achieve this
concept include:
(i) Providing well-defined pedestrian walkways or
circulation from parking areas, public sidewalks,
and building/shop entrances throughout the site.
(ii) Designing surface parking areas to avoid long
rows of uninterrupted parking.
(iii) Where possible, sites shall be designed to provide
vehicle and pedestrian connections to adjacent
sites and activity areas.
c. Outdoor lighting standards
The following standards apply to all uses and
development within this zone:
(i) Except for intermittent security lighting on
motion detectors, all lights more than seven feet
above the ground shall be directed downward
and have high cut-off light angles.
(ii) Large areas may be lit with a number of low-
intensity sources close to the area requiring
illumination. Illumination of a large area with a
remote single source of light shall be prohibited.
(iii) Lighting shall not be cast beyond the premises
and shall be limited to illumination of surfaces
intended for pedestrians or vehicles. Illumination
of landscaped areas shall be avoided unless the
landscaped area is immediately adjacent to the
building.
(iv) Pole lights shall be no taller than 25 feet above
a 36-inch base in parking lots, traffic areas, or
pedestrian areas.
d. Site furnishings:
Incorporate outdoor furniture, fixtures, and streetscape
elements into the site design that enhance and
complement the commercial functions of the site.
Miscellaneous structures and street furniture should
be designed to be part of the architectural design and
landscape. The following requirements will assure
consistency in site furnishing design and are applicable
to all non-residential uses. The following standards
shall apply:
(i) Utilize lighting, free- standing signs, trellises,
arbors, raised planters, benches and other forms
of seating, trash receptacles, bus stops, phone
booths, fencing, or other outdoor furniture or
streetscape fixtures in the site design to create
and define public spaces.
(ii) Locate site furnishings to maximize visual
surveillance of the area by residents, pedestrians
and passing vehicles to minimize covert activities
in the space and lessen risks to public safety.
(iii) Site furnishings should be a commercial-grade
designed for heavy public use.
4. VILLAGE COMMERCIAL
Intent: Promote attractive, unified, and viable
commercial businesses that serve the needs of the
community and provide jobs. Emphasize pedestrian
activity, safety and security while still providing for
drive thrus adequate auto and truck access.
i. Permitted Uses:
a. Provided that they are consistent with the intent of the
Zone, all uses are permitted outright except those uses
listed prohibited in Section IV.A.4.ii, and provided that
the Development Standards specified in Section IV are
satisfied. The applicant shall bear the burden of proving
that a proposed use achieves the stated intent of the
particular zone.
b. Use Definitions:
(i) Definitions of the specific land uses are found in
BMC Chapter 20.40.
c. Decision Authority:
(i) A use determination made by the Director may
be appealed to the Hearing Examiner following
a Type II decision process as set forth in BMC
Chapters 20.02 and 20.40
ii. Prohibited Uses:
a. The following uses are prohibited:
(i). Adult entertainment
(ii). Automobile sales
(iii). Light and heavy industrial/manufacturing uses
iii. Dimensional Standards
a. Standards for setback, yards, building coverage and
site coverage are indicated in Table A-1, Density &
Dimensional Standards.
iv. Public Space Requirements
a. Pedestrian-oriented spaces, amenities and corridors
shall be incorporated in the overall site design.
bay vista 25 section IV : ZONING & DEVELOPMENT REGULATIONSb. Pedestrian areas shall be easily accessible, clearly visible
and located to take advantage of surrounding features
such as building entrances, open spaces, significant
landscaping, unique topography or architecture.
c. Delineate pedestrian areas through the use of different
paving materials, scored paving surfaces, built-in
planters, landscape areas and freestanding site
furniture.
v. Development Standards
Site development shall be in accordance with the
standards of BMC 20.66.060 with the following
additions and revisions:
a. Buildings shall be arranged to facilitate integration and
use of plazas, courtyards, and greens.
b. Sites shall be designed to create an identifiable
pedestrian urban character. Methods to achieve this
concept include:
(i) Providing well-defined pedestrian walkways or
circulation from parking areas, public sidewalks,
and building/shop entrances throughout the site.
(ii) Designing surface parking areas to avoid long
rows of uninterrupted parking.
(iii) Where possible, sites shall be designed to provide
vehicle and pedestrian connections to adjacent
sites and activity areas.
c. Outdoor lighting standards
The following standards apply to all uses and
development within this zone:
(i) Except for intermittent security lighting on
motion detectors, all lights more than seven feet
above the ground shall be directed downward
and have high cut-off light angles.
(ii) Large areas may be lit with a number of low-
intensity sources close to the area requiring
illumination.
(iii) Lighting shall not be cast beyond the premises
and shall be limited to illumination of surfaces
intended for pedestrians or vehicles. Illumination
of landscaped areas shall be avoided unless the
landscaped area is immediately adjacent to the
building.
(iv) Pole lights shall be no taller than 30 feet above
a 36-inch base in parking lots, traffic areas, or
pedestrian areas.
d. Site furnishings:
Incorporate outdoor furniture, fixtures, and streetscape
elements into the site design that enhance and
complement the commercial functions of the site.
Miscellaneous structures and street furniture should
be designed to be part of the architectural design and
landscape. The following requirements will assure
consistency in site furnishing design and are applicable
to all non-residential uses. The following standards
shall apply:
(i) Utilize lighting, free- standing signs, trellises,
arbors, raised planters, benches and other forms
of seating, trash receptacles, bus stops, phone
booths, fencing, or other outdoor furniture or
streetscape fixtures in the site design to create
and define public spaces.
(ii) Locate site furnishings to maximize visual
surveillance of the area by residents, pedestrians
and passing vehicles to minimize covert activities
in the space and lessen risks to public safety.
(iii) Site furnishings should be a commercial-grade
designed for heavy public use.
vi. Building Orientation and Design Elements
a. Blank walls shall not face streets, unless modulated or
landscaped.
b. For surface development buildings may generally
follow the alignment of the streets they front.
vii. Architectural Building Elements and Character
Design Intent: To create a collection of buildings that
presents a unified character while allowing for the
individual architectural expression of each building.
The design character of an individual building should
be compatible (share similar features such as color,
scale, massing, width, setback and height and use) with
its commercial neighbors on either side and across the
street or plaza.
a. Building Scale: Design Intent
(i) To provide a consistent architectural scale
throughout, which is appropriate to a pedestrian
environment.
(ii) To create a concentration of buildings near the
plaza and along the street.
(iii) To achieve an inviting and interesting set of
buildings with distinctive character.
(iv) To ensure that the buildings present a varied
response to streets and public spaces.
(v) To create strongly identifiable elements and
Land Use/
Zone
Density
(Net dwelling
units (d.u.) per
acre)
Maximum
Height
Front Yard
(Building
Setback) (1)(ft)
Side Yards
(ft) (1,2)
Rear Yards:
d.u. or
commercial
space /
garage (ft) (2,3)
Maximum
Building
Coverage (4)
Maximum
Site
Coverage (5)
Residential Up to 38
d.u./acre
30 feet 10 (6)5 5/2 90%95%
Mixed Use/
Multi-Family/
Senior Housing
Up to 65
d.u./acre; + up
to 7,500 SF of
non-residential
use permitted
on the ground
floor facing
public street
65 feet 0 0 5/2 90%100%
Village
Commercial
N/A 65 feet 0 0 0 90%95%
(1) Corner lots shall have two (2) front yards and only one (1) side yard.
(2) Side and rear yard setbacks are subject to additional requirements contained in subsection 5.B.
Development Standards.
(3) Where garage is attached or integral to a dwelling unit, and there is no rear yard, the minimum rear yard
setback shall be five (5) feet for dwelling space, and two (2) feet for garage. Across an alley the distance
between facing garages shall be 24 feet minimum. A deck that does not exceed thirty (30) inches in height
above the finished grade may encroach within the rear-yard setback area to within three (3) feet of the
property line.
(4) Includes all area covered by structures and roofs, except roof overhangs of 2 feet or less.
(5) Includes area covered by structures and roofs, as defined above, and all impervious site materials.
(6) Additional front yard setback as required by utility provider.
26
November 2012section IV : ZONING & DEVELOPMENT REGULATIONSTable A-1 – Density and Dimensional Standards
bay vista 27 section IV : ZONING & DEVELOPMENT REGULATIONScivic gathering places that encourages a sense of
community and a sense of place.
(vi) To encourage use of good quality materials with
low maintenance life-cycle cost.
b. Building Modulation and Articulation
(i) Building street façades or walls facing pedestrian
plazas should be modulated to break down
the scale and have the varied look of multiple
buildings.
(ii) Building masses and edges along the street or
facing pedestrian plazas shall be articulated with
windows, entryways and vertical and horizontal
elements that provide interest.
(iii) Modulation and articulation may be
accomplished in a number of ways, including:
(a) The stepping back or projection of a portion of
the facade.
(b) Include significant building elements, such
as balconies, bay windows, porches, stoops,
pergolas, arcades, canopies or other pedestrian
weather-protection elements, towers, turrets,
entry areas, etc.
(c) Building focal points, which include distinctive
entry features, etc.
(d) Articulation of the roofline and/or
manipulating roof forms using gable-ends or
dormers.
(e) Changing materials and/or colors.
c. Articulate aspects of building function and design
through treatment of windows, doors, enhanced
entryways, corners with special trim, molding or
glazing; decorative building materials, such as tile and
metal work; balconies at upper stories; multiple-paned
windows; decorative railings, grillwork or landscape
guards; landscape trellises; or decorative light fixtures.
viii. Building Roof
a. Flat roofs and sloped roofs are allowed. If flat roofs
are used, cornices or projections are encouraged to
delineate roof edges and help with building modulation.
b. Roof mounted mechanical equipment (HVAC) shall be
screened from view with structural elements or screens
constructed of materials and details compatible with
those used in the building.
ix. Architectural Building Materials
Intent: To enhance the quality of both individual
buildings and the commercial center streetscape as
a whole. To encourage the use of traditional forms,
details, and good quality low maintenance materials
with low life cycle costs.
a. The materials of building elements such as roofs
(where exposed to view), exterior walls, trim, and other
miscellaneous elements, should be durable yet should
also possess an enduring commercial character.
b. The use of materials which provide textural interest is
encouraged for both roofs and walls (precast concrete,
masonry, brick, ornamental steel, metal panels, wood
or cementitious siding).
x. Service Areas
Intent: To screen service and utility elements from
view while providing efficient service areas.
a. Building service elements and utility equipment shall
be contained within the building envelope to the extent
practical so as not to physically encroach on or visually
impact public pedestrian areas.
b. All on-site service areas, loading zones, waste storage,
recycling collection, disposal facilities, transformer and
utility vaults and similar activities shall be located in
an area not visible from a public street or open space. If
this is not possible, then the service area, loading zone,
or storage area must be screened from public view.
Acceptable screening includes:
(i) Materials matching or compatible with the
adjacent building wall.
(ii) An opaque landscape hedge or other screening
device as approved by the City. Chain link
fencing with/without slats is not permitted.
(iii) Service/utility areas or enclosures shall not be
located in or be visible from the public plaza or
courts.
5. OPEN SPACE
Intent: The intent of the Open Space (OS) zone is to
recognize those areas, whether public or private, that
are intended to be maintained and used for active or
passive open space, parks, recreational activities or tree
preservation. Such areas may include squares or plazas
that are integrated into intensively developed portions
of the site.
i. Permitted Uses & Density:
a. Parks and open spaces used for active recreation and/
or passive enjoyment, including developed recreational
facilities
28
November 2012section IV : ZONING & DEVELOPMENT REGULATIONSb. Squares or plazas
c. Trails, pervious or impervious, for non-motorized use
d. Schools and playgrounds
e. Maintenance facilities not exceeding 500 square feet
f. Maintenance of trees, vegetation, and landscaping
h. Irrigation systems
i. Benches, picnic tables, pergolas, & similar amenities
j. Fountains, sculpture and artwork
k. Stormwater management facilities
l. Utilities and utility structures
m. Interpretive signs and displays
iii. Bay Vista Preserve Management Plan.
A management plan will be prepared for this
significant open space. The plan will be developed
with community input and will address vegetation
management, selective thinning to remove unhealthy
trees and invasive species, and the appropriate types of
improvements.
B. general deVeloPment
standards
General Development Standards shall be in accordance
with the standards of BMC 20.44 and 20.46 with the
following additions and/or revisions:
1. FENEStRAtION
The following additional architectural requirements
apply to Village Commercial along Bay Vista
Boulevard:
i. Streets and windows shall have a maximum sill height
above the ground or sidewalk of 36 inches.
2. BUILDING HEIGHt
i. Building height is defined as the distance from the
average finish grade at the façade to the highest point
of a flat roof, or midpoint of the sloping surface of a
pitched roof. Refer to Figure B-1.
ii. tower elements, not more than 300 square feet in
footprint, may exceed the maximum building height by
12 feet.
3. BUILDING SEtBACKS
i. Refer to table A-1 Density & Dimensional Standards.
bay vista 29 section IV : ZONING & DEVELOPMENT REGULATIONSC. streets, sidewalks and
driVeways
1. StREEt StANDARDS
Bay Vista’s circulation system – streets, sidewalks and
pedestrian paths – is an important element in site
design and providing connectivity on and off-site. The
locations of streets by type are shown in Figure D-1,
Thoroughfare Map. Streets, driveways and sidewalks
shall be constructed using the standards described
below and shown in Figure D-2, Street Sections.
Street Standards shall be in accordance with the
standards of BMC Title 11 with the following additions
and/or revisions:
i. Street Section 1
a Description: Two-lane streets with on-street
parking, sidewalks and trees on both sides. Connects
neighborhoods within Bay Vista.
b. Standards:
(i) Total right-of-way: 45-58 feet
(ii) Travel lane: (2) 8-11 feet wide
(iii) On-street parking (one & two sided): 7 feet wide
(a) On-street parking optional within village
commercial area.
(iv) Sidewalks: 5 feet wide
(v) Planting strips/swale:
(a) Six feet wide (including half-foot curb) on each
side.
(b) Street trees shall be placed every 40 feet (or
equivalent) and shall be 2.5-inch caliper
minimum at time of planting. Recommended
species are identified at the end of Subsection
G "Landscape Standards."
(c) Optional single swale on one side: 11 feet wide
with 6 feet wide sidewalk on opposite side of
street. Option provided to allow flexibility in
storm drainage and streetscape design.
c. Lighting:
(i) Ornamental street lights shall be used per
Section J8.
ii. Street Section 2
a. Description: Two-lane streets with on-street
parking, sidewalks and trees on both sides. Connects
neighborhoods within Bay Vista.
b. Standards:
(i) Total right-of-way: 47-52 feet
(ii) Travel lane: (2) 8-9 feet wide
(iii) On-street parking (one & two sided): 7 feet each
side
(iv) Sidewalks: 5 feet wide
(v) Planting strips/swale:
(a) Six feet wide (including half-foot curb) on each
side
(b) Street trees shall be placed every 40 feet (or
equivalent) and shall be 2.5-inch caliper
minimum at time of planting. Recommended
species are identified at the end of Subsection
G “Landscape Standards."
c. Lighting:
(i) Ornamental street lights shall be used per Section
J8.
iii. Street Section 3
a. Description: A commercial street with two traffic lanes,
on street parking, sidewalks and trees on both sides.
b. Standards:
(i) Total right-of-way: 54 feet
(ii) Travel lanes: (2) 9 feet wide
(iii) On-street parking (both sides): 7 feet each side
(iv) Sidewalks: 5 feet wide
(v) Planting strips:
(a) Six feet wide (including half-foot curb) on one
side
(b) Street trees shall be placed every 40 feet (or
equivalent) and shall be 2.5-inch caliper
minimum at time of planting. Recommended
species are identified at the end of Subsection
G “Landscape Standards.”
iv. Street Section 4
a. Description: A two-lane street with on-street
parking, sidewalks and trees on one side.
b. Standards:
(i) Total right-of-way: 34.5-36.5 feet
(ii) Travel lanes: (2) 8-9 feet wide
(iii) On-street parking (one side): Seven feet wide
(iv) Sidewalk: 5 feet wide
(v) Swale:
(a) Six feet wide (including half-foot curb) on
one side
(b) Street trees shall be placed every 40 feet
(or equivalent) and shall be 2.5-inch
caliper minimum at time of planting.
Recommended species are identified at the
30
November 2012section IV : ZONING & DEVELOPMENT REGULATIONSend of Subsection G “Landscape Standards.”
v. Street Section 5
a. Description: A two-lane street with on-street parking,
sidewalks on both sides and trees on one side.
b. Standards:
(i) Total right-of-way: 46.5 feet
(ii) Travel lanes: (2) 8 feet wide
(iii) On-street parking (both sides): 7 feet wide
(iv) Sidewalk: 5 feet wide
(v) Swale:
(a) Six feet wide (including half-foot curb) on one
side
(b) Street trees shall be placed every 40 feet (or
equivalent) and shall be 2.5-inch caliper
minimum at time of planting. Recommended
species are identified at the end of Subsection
G “Landscape Standards.”
vi. Green/Pedestrian Streets
a. Description: Landscaped pedestrian paths that connect
Bay Vista neighborhoods, parks and services.
b. Standards:
(i) Minimum Width: 8 feet
(ii) Sidewalks: Shall have a maximum width of 4 feet
(iii) Planting strips: Shall have a minimum width of
two feet (both sides)
vii. Alleys
a. Description: Alleys provide access to for private
automobile parking, either in garages or on grade, and
for deliveries and services for specified types of units.
b. Standards:
(i) Total right-of-way (garage face to garage face):
24 feet.
(ii) Travel lane: 14 feet
(iii) Planting strips (both sides): 3 feet
c. Alley entrances shall not be located along streets that
bound on a public green space.
d. The alley entrance should be a minimum of 55 feet
from an intersection measured from the perpendicular
right-of-way line of the cross street.
e. Driveway Entrances
(i) Standards: Private driveways shall only be allowed
when there is no automobile access from an alley.
(ii) Where driveways are allowed, the entrances shall
not be located on streets that border a public
open space along streets that do not front on a
public green space.
(iii) The driveway entrance should be a minimum of
55 feet perpendicular right-of-way line of the
cross street.
(iv) All driveway aprons shall be paved with concrete.
bay vista 31 section IV : ZONING & DEVELOPMENT REGULATIONSd. low imPaCt deVeloPment
1. INCLUSION OF LOW-IMPACt DEVELOPMENt
(LID)
Buildout of the Bay Vista Sub-Area Plan shall
incorporate LID to the greatest feasible extent, while
also recognizing that site, topography, soils and other
conditions may limit the inclusion of LID techniques
for stormwater. The development team shall apply good
faith efforts, explore and seek to include LID measures.
In its review of preliminary plat engineering and
design the City may impose conditions to reasonably
accommodate LID while also recognizing site-specific
limitations. Inclusion of all LID shall fit within the land
use framework established in this Sub-Area Plan.
2. DESIGN
Design of LID techniques such as rain gardens,
pervious pavements etc. shall be in accord with the
design criteria of the Washington State Department
of Ecology's Low Impact Development Technical
Guidance Manual for Puget Sound or the City of
Bremerton Public Works and Utilities Department.
3. FLOW CREDItS
LID techniques are intended to reduce the amount
of stormwater runoff required to be handled with
treatment and conventional flow control facilities. The
City of Bremerton shall grant Flow Credits for all LID
techniques included in Bay Vista. Flow Credits are
reductions to the volume of stormwater runoff the City
requires to be handled with conventionally engineered
facilities. Flow Credits shall be determined per the
modeling methods described in Chapter 7 of the
Washington State Department of Ecology's Low Impact
Development Technical Guidance Manual for Puget
Sound or the City of Bremerton Public Works and
Utilities Department.
e. Parking standards
Intent: Assure that sufficient space is provided for the
parking, loading and unloading of motor vehicles.
Provide minimum and maximum standards of space
and parking arrangements, and for the movement
of motor vehicles into and out of such spaces.
Encourage the creation of an aesthetically pleasing and
functionally adequate system of off street parking and
loading facilities.
Parking shall be provided in accordance with BMC
20.48 with the following exceptions and modifications:
1. GENERAL REQUIREMENtS
i. Off-street parking spaces and driveways shall be used
for the temporary storage of motor vehicles used by
persons visiting or having business to conduct on the
premises for which the parking is provided.
ii. Parking space required and intended for use by
occupants or users of specific premises shall not
be leased or rented to others, nor shall such space
be made unavailable through other means to the
users for whom the parking spaces are intended.
this, however, does not preclude shared parking
arrangements or other activities approved by the city
iii. Except where specifically permitted in certain zoning
designations, off-street parking spaces shall not be
used for loading or unloading of commercial vehicles
larger than those vehicles for which the parking spaces
are intended.
iv. Structured parking, not including private single- and
two-car garages, shall not be allowed with the
exception of the high density apartment parcels.
Structured parking shall be located behind liner
buildings of appropriate allowed uses as described
elsewhere in this document.
v. Off-street parking space dimensions shall be as
follows:
a. Compact spaces shall be a minimum of 7.5 feet wide;
b. Standard spaces shall be a minimum of 8.0 feet wide;
c. Standard spaces shall be a maximum of 10.0 feet wide;
32
November 2012section IV : ZONING & DEVELOPMENT REGULATIONSd. Compact spaces shall be a minimum of 15 feet in length. Standard spaces shall be a minimum of 18.0 feet in length; up to 2.0
feet may overhang curb or wheel stops.
e. Exceptions to the above minimum dimensions shall be granted for handicapped accessible spaces. Applicable state and federal
codes and requirements for accessible parking spaces shall supersede any requirements herein.
vi. Parking and loading areas shall be graded for proper drainage and provided with a suitable surface, as approved by the city
engineer.
vii. All driveways and areas used for loading, parking and maneuvering motorized vehicles shall be paved. Gravel surfaces are
not allowed.
viii. Each parking or loading space must be usable and readily accessible.
ix. Required parking and loading areas shall be provided with designated entrances and exits located so as to minimize traffic
congestion and avoid undue interference with public use of streets, alleys and walkways.
x. Parking and loading areas provided in accordance with the requirements of these standards shall not be used for the sale,
repair, assembly or disassembly, storage or servicing of vehicles or equipment. Unlicensed and inoperable vehicles shall not
be stored in any required parking or loading space.
xi. If existing parking lots are re-striped, the new layout of the parking spaces shall be the same as the previous layout; or if
changed, the changed layout shall conform to the existing dimensional requirements of this chapter.
Automobile Spaces Bicycle Spaces
Land Use Category Minimum Maximum
Residential:
Single Family/Duplex 1:d.u.2:d.u.N/A
Single Family ADU 1:d.u.1:d.u.N/A
Multi-Family 1:d.u.2:d.u.N/A
Apartment 1:d.u.2:d.u.1:10d.u.
Business/Commercial:
Retail 3:1,000 g.s.f.5:1,000 g.s.f.1:5,000 g.s.f.
Offices 3:1,000 g.s.f.5:1,000 g.s.f.1:2,500 g.s.f.
Restaurant 4:1,000 g.s.f. of seating
area
5:1,000 g.s.f. of seating
area
1:500 g.s.f. of seating
area
Medical/Dental 3.5:1,000 g.s.f.5:1,000 g.s.f.1:2,500 g.s.f.
Hotel/Inn 1:room 1.5:room N/A
All Other Commercial
Not Specified
3:1,000 g.s.f.5:1,000 g.s.f.1:2,500 g.s.f.
Educational 2:1,000 g.s.f.4:1,000 g.s.f.1:1,000 g.s.f.
Community Facility 1:1,000 g.s.f.3:1,000 g.s.f.1:1,000 g.s.f.
Table F-1 – Parking Requirements
bay vista 33 section IV : ZONING & DEVELOPMENT REGULATIONS2. COMPACt CAR ALLOWANCE
i. A maximum of 30 percent of the total required off-
street parking stalls may be permitted and designated
for compact cars in Village Commercial.
ii. Each compact stall shall be designated as such.
iii. Dimensions of compact parking stalls shall conform to
the standards as depicted in this chapter.
iv. the maximum compact car allowance may be
exceeded if an applicant submits a vehicle composition
study, relevant to the type of development, which
demonstrates that a greater number of compact
vehicles should be accommodated.
3. BICyCLE PARKING
i. the required minimum number of bicycle parking
spaces for each use category is shown on Table F-1.
Bicycle parking spaces are meant to accommodate
residents, employees, visitors, customers, messengers,
and other persons.
ii. Bicycle parking shall be located on site within 50
feet of well-used entrances and not farther from the
entrance than the closest motor vehicle parking space.
Bicycle parking may be located within city right-of-way
in areas without building setbacks, subject to approval
of the director and provided it meets the other bicycle
parking requirements.
4. OtHER REQUIRED PARKING SPACES
i. Motorcycle Parking Requirements. Motorcycle spaces
shall be required in non-residential areas only at a rate
of 1 per 100 automobile spaces with a minimum of 1
motorcycle space provided.
5. DRIVE-tHROUGH StACKING REQUIREMENtS
i. A stacking space shall be an area measuring 8 feet
by 20 feet with direct forward access to a service
window of a drive-through facility. A stacking
space shall be located to prevent any vehicles from
extending onto the public right-of-way, or interfering
with any pedestrian circulation, traffic maneuvering,
or other required parking areas. Stacking space for
drive-through or drive-in uses may not be counted as
required off-street parking spaces.
ii. For each drive-up lane a minimum of three stacking
spaces shall be provided.
iii. Stacking spaces serving businesses that are located
adjacent to a less intensive zone than that in which the
business is located, or are located adjacent to a public
use area (such as a street, sidewalk, park, or trail)
shall be landscaped to provide a buffer between the
stacking spaces and the adjacent zone or public use.
6. StRUCtURED PARKING
i. Structured parking shall be located behind the block
perimeter buildings. Structured parking may also be
located below buildings.
ii. Structured parking shall be screened, except at the
actual vehicular entry points and shall be screened.
iii. Vehicular and service entries to garages shall be
designed to look like a part of the building.
iv. Parking garages: Parking garages with flat roofs may
not exceed the height of the shortest building on the
block when a flat roof is present on any building on
the block, and parking garages with pitched roofs may
not exceed the height of the shortest building on the
block by more than one story.
7. ON-StREEt PARKING
i. On-street parking shall count as visitor parking. Each
24 feet of curb length, excluding 5 feet on either side
of a curb cut, shall count as one visitor parking space.
34
November 2012section IV : ZONING & DEVELOPMENT REGULATIONSf. landsC aPe standards
Intent: In addition to the significant parks and open
space included in the Sub-Area Plan, the Bay Vista site
will include significant landscaping with retained and
new trees and vegetation. Landscaping will be focused
along streets to enhance the pedestrian environment,
along the site’s boundaries with arterials to provide
screening, and adjacent to the commercial area to
provide land use transitions. In some areas, such as the
Bay Vista Village and Sinclair Square, hardscape and
green features will be mixed.
1. GENERAL DEVELOPMENt StANDARDS
i. Landscaping shall be provided in accordance with BMC
20.50 with the following additions and/revisions:
ii. Landscaping shall be constructed using the standards
described below.
2. PARkS ANd OPEN SPACE
General Requirements: The following types and
amounts of parks and open space will be provided in
Bay Vista:
i. Active Open Space:
a. Approximately 3-5 acres of land should be allocated for
active open space.
ii. Passive Open Space:
a. Approximately 10-11 acres of land should be allocated
for passive open space, with a natural/preservation area
as the central element. A proposed park is leveraged
on these features and will create a sense of arrival from
two edges of the development as well as a view corridor
of the greater Bremerton area.
b. Tree Preservation Open Space:
c. Approximately 3 acres of land should be allocated for
tree preservation, which will protect a large expanse
of second growth trees and a steep slope. This large
forested area will provide an anchor to the natural
environment, a regionally sensitive context for the
neighborhood, and a signature identity for the
community.
d. Public Ways: A network of approximately 30,000
linear feet of sidewalks and paths should be allocated
which will create a pleasant and convenient pedestrian
environment.
3. LOCAtION AND DESIGN OF PARKS & OPEN
SPACE
The general locations of open space are shown on Figure
4, Land Use Plan. The design concept and development
standards for on-site parks are described below.
i. the Bay Vista Preserve will be a large, multi-faceted
green space located in the center of the site. It
will be focused primarily on the preservation and
enhancement of the existing native area with passive
recreation throughout and an area of active recreation
at the south. It should contain the following:
a. Walking paths.
b. Recreation and community space.
c. Defined by the large existing stand of trees and homes
at its perimeter.
d. The north area of the park will be dedicated to the
preservation of native species, the central area will be
a transition and planted with native plant species that
draws the northwest character south. The south area
will be the most active with open lawn accented by
native plant species.
e. Both existing and new native landscape. Existing
areas shall be enhanced through the addition of native
species and the removal of invasive species. The new
areas shall be an opportunity to extend the native area
and provide an area of successional planting.
ii. Periwinkle Park is located on the eastern edge of Bay
Vista, at Oyster Bay Road, and will serve as a multi-
generational, multi-use park. It is intended to be an
expression of the northwest through its layout and
plant material.
4. tREE AND VEGEtAtION PRESERVAtION
REQUIREMENtS
i. Provide a tree survey conducted by an ISA certified
arborist at the time of site plan permit application to
bay vista 35 section IV : ZONING & DEVELOPMENT REGULATIONSSCREENING/BUFFER
BIOSWALE
EXISTING BUILDING
OPEN SPACE
EXISTING LANDSCAPE
TO BE RETAINED & SUPPLEMENTED
FIGURE 5 - LANDSCAPE PLAN
LEGEND
Figure G-1 – Landscape Plan
SECTION 1 (2-Sided Parking)
FIGURE D-1 THOROUGHFARE MAP
LEGEND
SECTION 1 (1-Sided Parking)
SECTION 2 (1-Sided Parking)
SECTION 3 (2-Sided Parking)
SECTION 4 (1-Sided Parking)
Figure D-1 – Thoroughfare Map
36
November 2012section IV : ZONING & DEVELOPMENT REGULATIONS
bay vista 37 section IV : ZONING & DEVELOPMENT REGULATIONSidentify and designate all trees and vegetated areas
located within lots and yards that can reasonably be
retained.
ii. Provide adequate protection for retained vegetation.
iii. Any tree proposed or required to be retained and
which is subsequently lost or destroyed must be
replaced with at least three six-foot trees or one 18-
foot tree or one 12-foot tree plus one six-foot tree of
the same species, located as directed by the architect.
iv. topping or trimming trees in a manner that alters
the natural symmetry of a tree is not allowed unless
necessary for safety reasons as certified by an arborist.
5. PARKING LOt DESIGN & LANDSCAPING
Parking lots shall meet the Parking Lot Design and
Landscaping requirements of BMC 20.48 and 20.50,
with the following changes:
i. Surface parking lots shall be located behind buildings
wherever feasible.
ii. Screening with evergreen plantings shall be provided
for parking lots in the following locations:
a. Any parking lots visible from Kitsap Way, SR 3, or from
internal streets;
b. Parking lots abutting residential/mixed-use uses or
zones;
c. Landscape requirements are one plant unit per twenty
spaces, with a minimum of one island for every ten
spaces.
iv. Where a tree planting island occurs the entire length
of a bay, there shall be a minimum of one tree planting
island every fifteen spaces and a large shade tree
every fifteen spaces in a tree planting island;
v. Where a tree planting island occurs, the entire length
of a bay, the entire length shall be planted with large
shade trees every forty five feet.
6. ADDItIONAL LANDSCAPING REQUIREMENtS
APPLICABLE tO ALL DEVELOPMENt SHALL
INCLUDE tHE FOLLOWING:
i. Maximize privacy between residences and their
private outdoor spaces while encouraging community
interaction in the public realm;
ii. Minimize visibility of utilities and other unsightly
necessities;
iii. Planting on slopes in open space and commercial
areas:
a. On slopes between 4:1 to 2:1 mass plantings of trees
and shrubs are suggested.
b. Slopes over 2:1 require erosion control measure such as
jute matting with ornamental grasses or groundcovers.
v. Neighborhood parks, squares or plazas should be
designed and landscaped to reinforce the civic nature
of these spaces, provide the appropriately scaled
amenities and reflect the anticipated function and
type, and intensity of use.
ix. Plant Selection
a. Planting Materials. A general planting list is included at
the end of this section.
(i) Other plant materials may be considered
that have these characteristics and similar
maintenance requirements;
b. Plants on Sloping Areas:
(i) Plants on slopes shall be selected for their ability
to develop deep roots and thereby knit the soil
into a cohesive mass.
(ii) Plants shall consist of native and adaptive species
that can withstand drought in summer as well as
continually wet soil in winter.
7. IRRIGAtION
i. All irrigation systems, with the exception of residential
systems, shall be designed by a qualified irrigation
designer.
38
November 2012section IV : ZONING & DEVELOPMENT REGULATIONSsuggested plant List
*Indicates native species
DECIDUOUS tREES
Small:
Acer circinatum – Vine Maple*
Acer japonicum – Full Moon Maple
Acer griseum – Paperbark Maple
Acer palmatum – Japanese Maple
Amerlanchier alnifolia – Serviceberry *
Amelanchier var. – Serviceberry varieties
Cornus – ‘Eddie’s White Wonder Dogwood’
Cornus kousa – Kousa Dogwood
Cornus mas – Cornelian Cherry
Cornus nuttallii – Pacific Dogwood *
Corylus cornuta – Western Hazelnut *
Magnolia kobus – Kobus Magnolia
Malus fusca – Western Crabapple *
Malus sp. – Crabapple (some)
Oxydendrum arboreum – Sourwood
Prunus cerasifera var. – Purple Leaf Plum varieties
Prunus virginiana ‘Canada Red’ –
Canada Red Choke Cherry
Stewartia
Styrax japonicus – Japanese Snowbell
Medium:
Acer rufinerve – Redvein Maple
Acer truncatum x platanoides “Warrenred” –
Pacific Sunset Maple
Acer truncatum x platanoides“ Keithsform” – Norwegian
Sunset Maple
Malus sp. – Some Crabapples
Parrotia persica – Persian Parrotia
Pyrus calleryana var. – Flowering Pear Varieties
Prunus sp – Flowering Cherry
Prunus s. ‘Shirotae’ – Shirotae Cherry
Columnar Narrow:
Carpinus betulus pyramidalis – Pyramidal Hornbeam
Fagus sylvatica ‘Cockleshell’ – European Beech
Gingko biloba ‘Princeton Sentry’ – Maidenhair tree
Parrotia persica ‘Vanessa’
Prunus sargenti columnaris – Columnar Sargent Cherry
Pyrus calleryana ‘Glen’s Form’ – Chanticleer Pear
CONIFERS
Abies grandis – Grand Fir *
Abies koreana – Korean Fir
Calocedrus decurrens – Incense Cedar
Chamaecyparis nootkatensis ‘Pacific Arrow’ –
Alaska Cedar
Juniperus scopulorum (var.) –Juniper
Picea omorika – Serbian Spruce
Pinus monticola – Western White Pine *
Pseudotsuga menziesii – Douglas fir *
taxus baccata – yew
thuja plicata ‘Excelsa’ – Western Red *
tsuga heteropylla – Western Hemlock *
SHRUBS
Smaller shrubs and Ground Cover:
Arctostaphylos columbiana – Hairy Manzanita *
Arctostaphylos uva-ursi – Kinnikinnick varieties *
Berberis (var.) – Dwarf Barberry varieties
Camassia quamash – Common Camas *
Fothergilla sp.
Fragaria chiloensis – Sand Strawberry *
Gaultheria shallon – Salal *
Ilex crenata ‘Helleri’ – Helleri Holly
Ilex crenata ‘Green Island’ – Green Island Holly
Linnaea borealis – twin Flower *
Lupinus arcticus – Arctic Lupine *
Lupinus polyphyllus – Large-Leaved Lupine *
Mahonia aquifolium ‘Compacta’-Compact Oregongrape *
Mahonia nervosa – Long Leaf Mahonia *
Oxalis oregano – Redwood Sorrel *
Polystichum munitum – Western Sword Fern *
Potentilla (var.) – Potentilla varieties
Prunus laurocerasus ‘Otto Luyken’ –
Otto Luyken Laurel
Rosa nutkana – Nootka Rose *
Rosa pisocarpa – Cluster Rose *
Spirea douglasii – Hardhack *
Spirea (var.) – Spirea ‘Mt Vernon’
Symphoricarpos albus – Common Snowberry *
trillium ovatum – Western trillium *
Vaccinium ovalifolium – Evergreen Huckleberry *
Vaccinium membranaceum – Black Huckleberry *
Vaccinium parvifolium – Red Huckleberry *
Viburnum davidii – David Viburnum
Viburnum (var.) – Viburnum varieties
Medium/Large:
bay vista 39 section IV : ZONING & DEVELOPMENT REGULATIONSAbelia x grandiflora – Glossy Abelia
Arbutus unedo (compacta) – Strawberry tree
Berberis (var.) – Barberry varieties
Ceanothus velutinus – tobacco Brush
Cornus sericea – Red Osier Dogwood
Enkianthus
Euonymus (var.) – Winged Euonymus varieties
Holodiscus discolor – Oceanspray *
Hydrangea quercifolia – Oakleaf Hydrangea
Hydrangea paniculata – Peegee Hydrangea
Ilex crenata “Convexa” – Convexleaf Holly
Lonicera involucrata – Black twinberry *
Mahonia aquifolium – tall Oregongrape *
Myrica californica – Pacific Wax Myrtle *
Oemleria cerasiformis – Indian Plum *
Osmanthus delavayii – Osmanthus
Osmanthus heterophyllus – Hollyleaf Osmanthus
Osmarea burkwoodi – Burkwood Osmarea
Philadelphus lewisii – Mock Orange *
Physocarpus capitus – Pacific Ninebark *
Prunus lusitanica – Portugese Laurel
Ribes sanguineum – Flowering Red Currant *
Rhododendron macrophylum or R. albiflorum – Western
Rhododendron *
Rhododendron (var.) – Rhododendron
Rubus parviflorus – thimbleberry *
Rubus spectabilis – Salmonberry *
Symphocarpus alba – Snowberry
taxus baccata – Irish yew
Viburnum vars. –Viburnum varieties
HEDGES
Buxus microphylla ‘Winter Gem’ –
Winter Gem Boxwood
Buxus sempervirens.- Common Boxwood
Buxus suffruticosa – true Dwarf Boxwood
Ilex crenata ‘Helleri’ – Helleri Holly
Ilex crenata ‘Green Island’ – Green Island Holly
Ilex crenata ‘Convexa’ – Convexleaf Holly Laurel
Ligustrum japonicum – Japanese Privet
Mahonia aquifolium – Oregongrape *
Osmanthus heterophyllus – Hollyleaf Osmanthus
Prunus laurocerasus ‘Otto Luyken’ Otto Luyken
Prunus lusitanica – Portugese Laurel
taxus sp. – yew species
taxus cuspidata (var.) – yew varieties
thuja occidentalis vars. – Arborvitae varieties
thuja occidentalis ‘Smaragd’ – Emerald Green
Viburnum vars. – Viburnum varieties
GROUNDCOVER
Arctostaphylos uva-ursi – Kinnikinnick varieties
Ceanothus – Wild Lilac
Cotoneaster vars. – Cotoneaster varieties
Evergreen flowering vines
Fragaria vars. – Strawberry varieties
Ivy (non-climbing varieties)
Juniperus (var.) – Juniper varieties
Lawn Grass (Puget Sound turf Grass varieties –
sod or seed
Mahonia nervosa – Longleaf Mahonia *
Mahonia repens – Creeping Mahonia
Ornamental grasses
thymus – thyme
Vinca minor – Periwinkle
ACCENt PLANtING
Annuals
Bulbs
Ornamental grasses
Perennials
40
November 2012section IV : ZONING & DEVELOPMENT REGULATIONSFigure D-2 Street Sections
bay vista 41 section IV : ZONING & DEVELOPMENT REGULATIONSFigure D-2 Street Sections
42
November 2012section IV : ZONING & DEVELOPMENT REGULATIONSFigure D-2 Street Sections
bay vista 43 section IV : ZONING & DEVELOPMENT REGULATIONSFigure D-2 Street Sections
44
November 2012section IV : ZONING & DEVELOPMENT REGULATIONSg. utility eQuiPment &
storage
1. Utilities shall be installed underground to the greatest
extent feasible. Utilities installed above ground shall
be screened from view whenever possible.
2. trash storage areas shall be screened from view, animal
proof, and easily accessible to service personnel. All
trash enclosures shall be screened.
3. Roof and ground- mounted equipment, including HVAC
units, shall be screened from view from any public
street or open space. Satellite dishes and antennas
shall be the smallest possible to receive the signal,
shall be placed in the least conspicuous location, and
screened and painted to match the colors of the
adjacent building as closely as possible.
H. walls, Hedges and fenCes
1. Fence height may not exceed six (6) feet.
2. Front yard fences may not exceed four (4) feet in
height and shall be an ‘open’ style. these must be set
back at least one (1) foot from the back edge of the
sidewalk.
3. the maximum combined height for front yard walls
with fences is four feet, as measured on the downhill
side.
4. Walls or fences on slopes over 15% and visible from
the public areas, shall step with the slope in sections
at a rate of 1 step per each 12 inches of change in
elevation of the adjacent ground, measured parallel to
the fence.
5. Fences defining the front edge of courtyards or
semi-public open spaces associated with cottage
court developments and courtyard buildings shall
be as specified for other front yard fences above.
Articulation of the entry from the street to such open
spaces with decorative gates, trellises and/or arbors is
encouraged.
6. Side yard fences attached to the face of the house
shall be set back between two feet and five feet from
the front face of the house.
7. Side yards setbacks near public areas shall be at least
50% open. Adjacent to any public walkway or other
open space shall not be fenced for more than 50% of
the length of the building's façade.
bay vista 45 section IV : ZONING & DEVELOPMENT REGULATIONSi. exterior ligHting
1. Subtle, low-level lighting of front porches and front
yard landscape areas is encouraged. Light pollution
shall be minimized by selection of proper fixtures.
2. Lighting shall not spill over beyond property lines or
cast glare to surrounding properties.
3. Pole mounted lighting is not permitted inside the
property lines of any detached or attached residential
structures. Pole mounted pedestrian lighting should be
used in the right-of-way.
4. Lighting in garage and utility areas shall not impact
neighboring properties or common areas. Motion
sensitive wall mounted exterior lights are required on all
garage façades facing alleys.
5. Exterior light fixtures should match the architectural
style of the building.
6. Lighting for commercial uses shall be appropriately
shielded so as to not impact adjacent residential areas
or residential units in mixed-use buildings.
7. All street lights should be comprised of ornamental
poles and fixtures conforming to the City's “Standards
for Work in the ROW”; Cobra heads and shoe box
style lighting is prohibited. Preferred lights are 12-14
feet tall. 20 foot tall poles may be utilized at major
intersections.
8. Parking lot lighting shall conform to the standards in
the Village Commercial zone.
9. Porch lights may be compact-fluorescent or
incandescent.
j. sign standards
Intent: These criteria and standards have been
established for the purpose of ensuring that all signage
at Bay Vista is designed and constructed in a manner
which consistently promotes the following:
• Visual harmony between signage and Bay Vista
architecture including adjacent materials and
colors.
• Elegant, yet clear and distinctive identity for each
tenant.
• Visual enhancement of the pedestrian experience.
• Diversity and individuality for each tenant’s
signage while maintaining a consistent size and
quantity through out Bay Vista.
• The use of creativity and high quality materials.
• Thoughtful and creative lighting of signage.
1. GENERAL GUIDELINES
i. Description: All signs and graphics shall be
professionally designed. the lettering and spacing of
letters shall be well proportioned to assure legibility
as well as a pleasing appearance. Shop drawings for
each sign, including colors, dimensions, specifications
and proposed construction materials will be required
criteria for approval of signage by the Architectural
Review Committee. tenant must have written approval
by the Architectural Review Committee prior to
application for the required city sign permits.
ii. Material Preferences: tenant sign design and
construction should match the materials used on the
exterior of the building.
iii. Lighting: Signs may be internally or externally
illuminated. Halo or other indirect lighting is
encouraged. Exposed neon or bulbs are not allowed.
Indirect lighting must be baffled or shielded to reduce
blare in the eyes of pedestrians.
iv. Standards: Sign standards shall be in accordance with
BMC 20.52, with the exceptions and modifications
contained in these sign standards. traffic control
signs shall conform to the “Manual of Uniform traffic
Control Devices.”
46
November 2012section IV : ZONING & DEVELOPMENT REGULATIONS2. SIGNS AND SIGN COMPONENtS NOt
PERMIttED
i. the following signs and sign components are not
permitted:
a. Moving, flashing, rotating, noise making or odor
producing signs. Electronic message displays are not
permitted.
b. “Human A-boards”
c. Signs taped or glued to interior window.
d. The name, stamps or decals of the sign manufacturer
cannot be displayed on any portion of the sign.
Underwriters Laboratories labels shall be applied in an
inconspicuous manner.
e. Non-ornamental hardware or electrical components
may not be exposed to view.
f. Back-lit awnings, including those with signage, are not
permitted.
3. SIGNAGE SUBMIttAL AND APPROVAL
PROCESS
i. Prior to construction of any sign or application for city
sign permits, the building owner, tenant or tenant’s
sign contractor must obtain the Architectural Review
Committee’s written approval of the proposed sign
design. the process shall be as follows:
a. Tenant to submit completed sign application along with
required drawings to Architectural Review Committee.
b. Architectural Review Committee to review designs
and either approve, approve with corrections, or deny
application within 10 days of receipt by Architectural
Review Committee.
c. If application denied, tenant to review reasons for
denial and then change their application and re-submit
a new application to Architectural Review Committee.
d. Once approval is granted by Architectural Review
Committee, tenant may then submit a sign application
to the City of Bremerton.
ii. Failure to comply with the above process may result
in the removal of signage by Architectural Review
Committee at tenant’s sole expense, provided
Architectural Review Committee will issue notice to
tenant/Building Owner of the failure to comply at
least 30 days prior to Architectural Review Committee
removal to allow tenant/Building Owner time to cure
problem and comply.
4. BAy VIStA SIGN CAtEGORIES DEFINED
i. Signs or signage requested by a retail tenant or
building owner within Bay Vista shall fall into one of
the categories listed below. In order to determine
the applicable category, read the definitions and
standards in these regulations (by type and category).
Architectural Review Committee will make final
determination in the event of any still un-definable
categories.
ii. Single Occupant Retail Signage Category: Single
Occupant Retail Signage Category defined as signage
needed by a retail tenant who occupies a building on
a legal lot specific to that building, with no more than
one retail establishment utilizing said building.
iii. In-line Retail Signage Category: In-line Retail Signage
Category, defined as signage needed by retail tenants
who occupy a space within the Village which is
physically adjacent to, or sharing demising walls with,
neighboring tenants.
iv. Residential Signage Category: Residential Signage
Category defined as signage needed by residential
neighborhood, buildings, or group of buildings
including multiple residences (for rent or sale) which
were built in a coherent manner by a single entity on
one or more lots.
v. Bay Vista Village Identification & Directional Signage
Category: Bay Vista Village Identification & Directional
Signage Category defined as Bay Vista Village-specific
signage that is intended to identify the overall Bay
Vista Village development or facilitate the orientation
of pedestrian or automobile traffic throughout the Bay
Vista Village to specific tenants or buildings.
5. SINGLE OCCUPANt REtAIL SIGNAGE
CAtEGORy: SIGNAGE RULES
i. Freestanding Signs: Allowed for parcels that abut
Hwy 3 per 20.52.100. Not permitted for all other
parcels. Parking lot directional signage allowed and
must be solely intended to direct parking lot traffic
and may not exceed six square feet, and may not
have any business identification or emblems. In some
bay vista 47 section IV : ZONING & DEVELOPMENT REGULATIONScases, at Architectural Review Committee’s discretion,
Single Occupant Retail tenants may be eligible for
identification on certain type “B” and type “C” Bay
Vista Village monument signs.
a. Building Signs:
(i) Internally or externally illuminated building
signage allowed. Halo-lit metal signs are
encouraged.
(ii) One building sign allowed per building elevation
visible from street or right of way (public or
private) and parking lot.
(iii) Cumulative allowed sign areas for each Single
Occupant Retail Building within Bay Vista
Village shall not exceed 10% of the wall plane
area the sign is mounted to. Note: square footage
shall be measured by boxing individual letters
and symbols, maximum 100 square feet.
b. Blade Signs: Blade signs are to be designed and
constructed using the following criteria. As with all
signs, blade signs must be approved by Architectural
Review Committee prior to submitting an application
to the city.
(i) Size: Blade signs are to be a maximum of 24
inches high x 36 inches wide in size and a
minimum of 1 inch thick with a maximum of
2 inches in thickness for the background panel.
Raised graphics may be a maximum of .5 inch
thick for an overall maximum thickness of three
inches.
(ii) Quantity: Tenants with one street frontage are
allowed one blade sign. Tenants located on a
corner are allowed one blade sign per street
frontage (public or private).
(iii) Custom shapes other than a rectangle or square
are encouraged.
(iv) Lettering and graphics should be raised/
dimensional. Flat vinyl graphics are heavily
discouraged.
(v) Blade signs are to be installed on custom metal
brackets/hangers. In an attempt to promote
individuality for each tenant, there will be no
common bracket for blade signs. Tenants are
encouraged to be creative in their design and
fabrication of this element.
(vi) The minimum clearance for blade signs is 8 feet
from grade to bottom of sign.
(vii) Placement of blade sign in most cases should be
directly over the primary entrance to the Tenant
space or centered along tenant frontage, if two or
more tenants share an entrance.
(viii) Blade sign material shall be a high quality
material such as wood, metal or glass.
Architectural Review Committee will be the sole
judge as to the acceptability of materials and
designs.
(ix) Illumination. Lighting of the Tenant’s blade
sign is allowed. The Architectural Review
Committee shall approve the lighting design
before installation of such lighting. Electricity
for spotlighting must come from Tenant’s space
and the lighting must be installed by a licensed
electrical contractor. External lighting must be
baffled or shielded to reduce glare in the eyes of
pedestrians.
c. Window Lettering: Window lettering must meet the
following criteria:
(i) All lettering is to be professionally painted
or applied vinyl directly on the inside of the
storefront glass door.
(ii) The logo and name of the store may be
represented by letters up to a maximum height of
6 inches.
(iii) Store hours on the entry door are encouraged.
(iv) If Tenant has a non-customer door for receiving
merchandise, the Tenant’s name and address,
number only, may be applied on the door. The
letter height is to be 2 inches high, Helvetica
Light font made of white vinyl applied at 5-feet,
6-inches above bottom edge of door. Where more
than one tenant uses the same door, each name
and address shall be applied.
6. IN-LINE REtAIL SIGNAGE CAtEGORy:
SIGNAGE RULES
i. Freestanding Signs: Not permitted.
ii. Building Signs
a. Internally or externally illuminated building signage
allowed. Halo-lit metal signs are encouraged.
b. One building sign allowed per Tenant visible from
street or right of way (public or private) and parking lot.
c. When calculating allowed area of building signage for
in-line retailers the following criteria apply:
(i) Width of sign may be no more than two thirds
the width of the elevation to the Tenant space to
which sign will be attached.
(ii) The maximum letter height shall be 18 inches,
and logos or emblems may be no larger than 30
inches in height. If two lines of copy are used, the
combined height of both rows may be no larger
48
November 2012section IV : ZONING & DEVELOPMENT REGULATIONSthan 28 inches.
(iii) Cumulative allowed sign areas for each in-line
retail tenant within Bay Vista Village are as
follows: 8% of wall plane the sign is mounted
to, not to exceed 50 square feet. Note: Square
footage measured by boxing individual letters
and symbols.
iii. Blade Signs: Blade signs will be required for Bay Vista
Village In-line Retail tenants. Blade signs are to be
designed and constructed using the following criteria.
As with all signs, blade signs must be approved by
Architectural Review Committee prior to submitting an
application to the city.
a. Size: Blade signs are to be a maximum of 24 inches
high x 42 inches wide in size and a minimum of 1 inch
thick with a maximum of 2 inches in thickness for the
background panel. Raised graphics may be a maximum
of .5 inch thick for an overall maximum thickness of 3
inches.
b. Quantity: Tenants with one street or plaza frontage are
allowed one blade sign. Tenants located on a corner
are allowed one blade sign per street or plaza frontage
(public or private).
c. Custom shapes other than rectangle or square are
encouraged.
d. Lettering and graphics should be raised/dimensional.
Flat vinyl graphics are discouraged.
e. Blade signs are to be installed on custom metal
brackets/hangers. In an attempt to promote
individuality for each tenant, there will be no common
bracket for blade signs. Tenants are encouraged to be
creative in their design and fabrication of this element.
f. The minimum clearance for blade signs is 8 feet from
grade to bottom of sign.
g. Placement of blade sign in most cases shall be directly
over the primary entrance to the Tenant space or
centered along tenant frontage if two or more tenants
share an entrance.
h. Blade sign material shall be a high quality material
such as wood, metal or glass. Architectural Review
Committee will be sole judge as to the acceptability of
materials and designs.
i. Illumination. Lighting of the Tenant’s blade sign is
allowed. The Architectural Review Committee shall
approve the lighting design before installation of such
lighting. Electricity for spotlighting must come from
Tenant’s space and the lighting must be installed by a
licensed electrical contractor. External lighting must
be baffled or shielded to reduce glare in the eyes of
pedestrians.
iv. Window Lettering
a. All lettering is to be professionally painted or applied
vinyl directly on the inside of the storefront glass door.
Gold or silver leaf is encouraged.
b. The logo and name of the store may be represented by
letters up to a maximum height of 3 inches.
c. Store hours on the entry door are encouraged. The
store hours lettering may not exceed 9 inches high x 12
inches wide.
d. If Tenant has a non-customer door for receiving
merchandise, the Tenant’s name and address, number
only, may be applied on the door. The letter height is
to be 2 inches high, Helvetica Light font made of white
vinyl applied at 5 feet, 6 inches above bottom edge of
door. Where more than one tenant uses the same door,
each name and address shall be applied.
7. RESIDENtIAL SIGNAGE CAtEGORy: SIGNAGE
RULES
i. Freestanding Signs: One freestanding neighborhood
identification sign is permitted at each entrance to
a residential neighborhood or as allowed by BMC
20.52. Halo or indirect illumination is allowed. Parking
lot directional signage allowed and must be solely
intended to direct parking lot traffic.
ii. Building Signs: the following rules for residential
building signs apply: (Note: Square footage shall be
measured by boxing individual letters and symbols.)
a. Building signs may be substituted for freestanding signs.
b. Halo or indirect illumination is allowed.
iii. Size
a. Standard allowance to be 20 square feet per sign.
bay vista 49 section IV : ZONING & DEVELOPMENT REGULATIONSb. 30 square feet per sign: to be allowed if the following
materials are used: brass, copper, chrome, brushed or
polished aluminum, stainless steel, etched glass, stone,
gold or silver leaf, porcelain and hardwoods.
iv. Blade Signs: Blade signs are allowed at residential
amenity space entryways or leasing and sales offices.
Blade signs are to be designed and constructed using
the following criteria. As with all signs, blade signs
must be approved by Architectural Review Committee
prior to construction.
a. Size: Blade signs may be a maximum of 24 inches
high x 36 inches wide in size and a minimum of 1 inch
thick with a maximum of 2 inches in thickness for the
background panel. Raised graphics may be a maximum
of .5 inch thick for an overall maximum thickness of 3
inches.
b. Quantity: Tenants with one street frontage are allowed
one blade sign. Tenants located on a corner are allowed
one blade sign per street frontage (public or private).
c. Custom shapes other than rectangle or square are
encouraged.
d. Lettering and graphics should be raised/dimensional.
Flat vinyl graphics are heavily discouraged.
e. Blade signs are to be installed on custom metal
brackets/hangers. In an attempt to promote
individuality for each tenant, there shall be no common
bracket for blade signs. Tenants are encouraged to be
creative in their design and fabrication of this element.
f. The minimum clearance for blade signs is 8 feet from
grade to bottom of sign.
g. Placement of blade sign in most cases shall be directly
over the primary entrance to the Tenant space or
centered along tenant frontage if two or more tenants
share an entrance.
h. Blade sign material shall be a high quality material
such as wood, metal or glass. Architectural Review
Committee will be sole judge as to the acceptability
of materials and designs.i. Illumination.
Lighting of the Tenant’s blade sign is allowed. The
Architectural Review Committee shall approve the
lighting design before installation of such lighting.
Electricity for spotlighting must come from Tenant’s
space and the lighting must be installed by a licensed
electrical contractor. External lighting must be baffled
or shielded to reduce glare in the eyes of pedestrians.
v. Window Lettering
a. All lettering is to be professionally painted or applied
vinyl directly on the inside of the storefront glass door.
Gold or silver leaf is encouraged.
b. The logo and name of the store may be represented by
letters up to a maximum height of 3 inches.
c. Store hours on the entry door are encouraged. The
store hours lettering may not exceed 9 inches high x 12
inches wide.
d. If Tenant has a non-customer door for receiving
merchandise, the Tenant’s name and address, number
only, may be applied on the door. The letter height is
to be 2” high, Helvetica Light font made of white vinyl
applied at 5 feet, 6 inches above bottom edge of door.
Where more than one tenant uses the same door, each
name and address shall be applied.
8. BAy VIStA VILLAGE IDENtIFICAtION AND
DIRECtIONAL SIGNAGE
i. Primary Bay Vista Village Identification Monument
Signs: Bay Vista Village may have up to three primary
identification freestanding monument signs (entrance
and portal) and may share one primary identification
freestanding monument sign (portal) with the
residential community. Maximum size shall be 100
square feet.
ii. Secondary Identification Monument Signs: Bay Vista
Village may have up to four Secondary Identification
Monument Signs, one per building. Maximum size
shall be forty square feet.
iii. Directional tenant/Building Owner Signs: Bay Vista
Village may have freestanding and/or wall directional
signs as needed to help pedestrian and automobile
traffic locate various retail tenants and building
owners within the Village. the style of these signs is to
be consistent with primary and secondary monument
signs. Maximum size shall be six square feet.
50
November 2012section IV : ZONING & DEVELOPMENT REGULATIONSk. glossary
Definition of terms shall be in accordance with the
definitions of the BMC with the following additions
and/or revisions.
ARCADE – A colonnade with arched openings.
BLADE SIGNAGE – A vertically oriented sign hung from,
and perpendicular to, a facade so that it may be read by
pedestrians on the sidewalk.
BLOCK – A unit of land bounded by streets on all sides.
BUILDING HEIGHt – The distance from the average
finish grade at the façade to the highest point of a flat
roof, or midpoint of the slope on a pitched roof.
CHEEKWALL – The side wall of a flight of stairs or steps.
COLONNAdE – A covered passage way supported by
column, and lintels open to the street with rectangular
openings.
COURtyARD – A courtyard is a space defined by a
single building or multiple buildings on at least two
sides, and a fence or building or other well-defined
edge on all other sides.
DOOR-yARD – The area between the setback and the
public sidewalk. Planting, porches, lead walks, stoops
and fence occurs within this area.
FOOtPRINt – The footprint is an outline showing the
extent to which a home, building, or other architectural
element covers the lot on the ground level.
FRONtAGE OCCUPANCy – The minimum amount of
primary façade that must be built along a setback.
FURNISHING ZONE – A continuous zone extending
the entire length of commercial and mixed-use streets
parallel to the street and delineated from the back of
curb, having a consistent width that is identified for
the placement of permanent elements such as street
trees, tree pits, tree grates, street lights, trash cans and
benches. Moveable tables and chairs are not prohibited
from this zone.
GARDEN WALL – A wall that separates a courtyard,
front yard, or service area from the street in order to
screen private activities from the public realm. Garden
Walls are independent walls over four (4) feet high.
LEAD WALK – Pavement that is intended for pedestrian
travel to and from a building entryway, courtyard and
the sidewalk.
LIVE-WORK – A live-work building/unit is one in
which the bottom floor is designed for commercial
uses and the space above is designed for, and occupied
by, residential uses. It is also designed such that the
attached residential unit could have direct access to
the commercial space if the residential occupant were
also the commercial tenant or commercial business
owner, but can be secured (prohibiting access from the
above residential unit to the commercial space below)
if resident is not the commercial tenant or commercial
business owner.
LOGGIA – Similar to a porch, a loggia is a covered
exterior space, but one that is set inside or recessed
into a facade (as opposed to a porch which protrudes
or extends beyond the facade of a building.
MIxED-USE BUILDING – A building with two or more
uses having a different use on the ground floor (e.g.,
retail on the ground floor and residential above).
OPEN SPACE – An area that is intended to provide light,
air, and/or views or general appearance of openness,
and is designed for scenic, recreational, private, or
environmental purposes.
PAIRED FACADES – Two facades next to each other,
sitting in front of an open space composed with the
same or a complimentary architectural design and
character.
RESIDENtIAL MIxED-USE BUILDING – A mixed-use
building that requires residential use on the second
and higher floors.
PORCH – A porch is a covered, platform raised above
the surrounding ground providing a transition from
the public to private realms and entry into usually a
single dwelling unit but, on occasion, multiple dwelling
units.
bay vista 51 section IV : ZONING & DEVELOPMENT REGULATIONSPRIMARy FACADE – All elevations (Front and Side )
that are parallel to, or are clearly visible from a street.
SCREENING – A natural or constructed barrier
consisting of any landscaping, fencing, or other barrier
intended to block a view.
SECONDARy FAÇADE – All elevations that are not
defined as a primary façade.
SEt PIECE FAÇADE – A primary facade in a prominent
location that should be designed as a focal element
with a greater amount of detail than the surrounding
buildings.
StOOP – A raised, covered or non-covered, projecting
stairway that connects a building's porch or entryway
to the ground usually at the front yard a building.
StREEt FRONtAGE – The building or house facade
running parallel to a public street or private street.
StREEt WALL & FENCE – The street wall, or street face,
is the visual three-dimensional wall that is formed by,
and composed of, the primary facades located along
the build-to line.
tHRESHOLD – A passageway enclosed by buildings on
both sides and above by building or other architectural
elements, that one moves through to enter a space or
street.
tOWER ELEMENtS – An integrated, architectural
element that extends above the roof line that may be
used for signage/advertisement per approval of the Bay
Vista Architectural Review Committee.
VISItABLE DWELLING UNIt & VISItABLE ENtRIES –
A visitable dwelling unit includes at least one zero-step
entry, located at either the front or back of a unit,
with a minimum 3-foot wide entry door and includes,
among other things, 3-foot passage doors throughout
the ground floor of the entire unit. A visitable entry is a
zero-step entry to a dwelling unit.
52
November 2012section IV : ZONING & DEVELOPMENT REGULATIONSl. design intent
The intent of the Bremerton Housing Authority’s
Master Plan for the Bay Vista site is to have the
community follow the principles of traditional
neighborhood design. Early in the last century,
communities were much more pedestrian-friendly and
socially connected. In a traditional neighborhood, one
will see residential and commercial uses mixed, or in
close proximity to each other. Newer communities,
however, have segregated these uses, requiring
residents to use their automobiles to do anything
outside of their homes. The goal at Bay Vista is to
encourage resident interaction by making the streets
and buildings as pedestrian-oriented as possible, and
to provide mixed uses that allow residents to walk
down the street to purchase some basic needs, rather
than leaving the community and driving to a retail
destination for every need.
The look and feel of the community should enhance
the pedestrian experience, and the design concept of
a varied and interesting village that has evolved and
built up over time is a design objective. Large buildings
should be designed such that their facades have the
appearance of several smaller buildings, using varied
colors and materials and modulation, to reduce their
apparent scale. Houses and individual townhouse
units should be designed to appear as unique buildings
grouped together, rather than repetitions of the same
façade.
Commercial and retail buildings should enhance
the window shopping experience, and create a
sense of liveliness and quality through the use of
varying materials, colors, signage and awnings.
Commercial streets should contribute to this effect
with enhanced paving materials and the use of street
trees, street furnishings and pedestrian-scaled lighting.
Commercial and mixed-use buildings should have a
timeless character, and a northwestern look and feel.
This section will work in tandem with Section IV
Zoning and Development Standards. The Design
Standards are not City regulations, but will be adopted
as Covenants, Conditions, & restrictions (CC&R's)
applicable to all property within Bay Vista. The Bay
Vista Architectural Review Committee (ARC) will
be responsible for their enforcement. The ARC will
review all building and related applications before
they are submitted to the City to ensure compliance
with these standards (details are available through the
Architectural Review Committee).
1
2012 Comp Plan Amendment
ORDINANCE NO. ____
AN ORDINANCE of the City Council of the City of
Bremerton, Washington, amending the Comprehensive Plan by
amending the Downtown Regional Center Subarea Plan to include
three parcels located at the corner of Burwell Street and Warren
Avenue in the Downtown Regional Center Subarea Plan boundaries;
and by amending the Bay Vista Subarea Plan.
WHEREAS, the City of Bremerton adopted a Comprehensive Plan on December
1, 2004 by Ordinance No. 4917 and has been subsequently amended by Ordinances No.; 4954,
4962, 4985, 4998, 5025, 5034, 5037, 5062, 5077, 5082 and 5094 hereinafter referred to as the
“Comprehensive Plan”; and
WHEREAS, the Washington State Growth Management Act ("GMA") requires
internal consistency among comprehensive plan elements and applicable regional plans; and
WHEREAS, to assure that comprehensive plans remain relevant and up to date,
the GMA requires each jurisdiction to establish procedures whereby amendments to the plan are
considered by the City Council (RCW 36.70A.130(2)), and limits these amendments to once
each year unless an emergency exists; and
WHEREAS, the City of Bremerton has established a procedure for amending the
Comprehensive Plan in Title 20.10.010 of the Bremerton Municipal Code (BMC), that limits
amendments to the Comprehensive Plan to no more than once each year; and
WHEREAS, the City of Bremerton allows applications to be submitted each year
between January and the first business day of April; and
WHEREAS, two Comprehensive Plan amendment applications were submitted
by the public prior to the deadline to address changing circumstances relative to land use needs;
and
WHEREAS, the Planning Commission conducted workshops on the 2012
amendment docket on July 17, 2012 and September 18, 2012; and
WHEREAS, consistent with RCW 36.70A.106 the 60-day notice period began on
September 5, 2012 when the Washington State Department of Commerce received notification of the
Comprehensive Plan Amendment docket for 2012; and
WHEREAS, on September 29, 2012 the public was notified by a legal
advertisement in the Kitsap Sun of the opportunity to make comment and participate in the
public hearing held by the Planning Commission; and
WHEREAS, on September 20, 2012 a SEPA DNS was issued for amendment
Docket Item 1, relating to the Downtown Regional Center Subarea Plan, with an administrative
2
2012 Comp Plan Amendment
appeal deadline of October 4, 2012 and no appeals were filed; and
WHEREAS, SEPA was satisfied on September 26, 2012 for Docket Item 2,
relating to the Bay Vista Subarea Plan, by the adoption of existing environmental documentation
of the Bay Vista EIS in May 2007 and SEIS in January 2008; and
WHEREAS, on October 9, 2012 the Planning Commission conducted a public
hearing on the 2012 Comprehensive Plan Amendment Docket, and the Planning Commission
recommended the City Council approve the amendments; and
WHEREAS, on December 1, 2012 the public was notified by a legal
advertisement in the Kitsap Sun of the opportunity to make comment and participate in the
public hearing held by the City Council; and
WHEREAS, on December 19, 2012 the City Council conducted a public hearing
and considered all testimony prior to their decision; and
WHEREAS, the amendment proposals satisfy the decision criteria of BMC
20.10.080 for Comprehensive Plan amendments; and
WHEREAS, the proposal meets requirements of the Washington State Growth
Management Act (GMA); and
WHEREAS, the proposal is consistent with Kitsap County Countywide Planning
Policies (KCCPP).
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON,
WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. The findings set forth in the recitals above area hereby adopted and
incorporated herein.
SECTION 2. The findings and conclusions adopted by the Planning
Commission on October 9, 2012 and attached hereto as Exhibit A are adopted and incorporated
as if set forth fully herein.
SECTION 3. The City of Bremerton Comprehensive Plan is hereby amended by
approving and adopting the proposed 2012 Comprehensive Plan amendments set forth in docket
items 1 through 2 as follows:
Docket Items:
1. Burwell and Warren Avenue Parcels: Amend the Downtown Regional Center
Subarea Plan to include three parcels located at the corner of Burwell Street and
Warren Avenue in the Downtown Regional Center boundaries and given a land
use designation of Warren Avenue Corridor (WC), more particularly described in
3
2012 Comp Plan Amendment
Exhibit B affixed hereto.
2. Bay Vista Subarea Plan: Amend the Bay Vista Subarea Plan summarized as
follows: reallocation of Village Commercial and multi-family locations; revise
permitted land uses to reflect land use zones that are being condensed; revise
complex Code requirements in Subarea Plan to more resemble the City of
Bremerton Zoning Code; and alter landscaping, signage and parking requirements
which will still comply with overall policies and goals of the existing Bay Vista
Subarea Plan, and more particularly described in Exhibit C affixed hereto.
SECTION 4. Severability. If any provision of this ordinance is held invalid or
unconstitutional, such invalidity or unconstitutionality shall not affect the validity or
constitutionality of the remainder of this ordinance. Provided however, that if any provision of
this ordinance is held invalid or unconstitutional, then the provision in effect prior to the
effective date of this ordinance shall be in full force and effect for that individual provision as if
this ordinance had never been adopted.
SECTION 5. Effective Date. This Ordinance shall take effect and be in force ten
(10) days from and after its passage, approval, and publication as provided by law.
PASSED by the City Council the___________ day of ____________________, 2012
_________________________________
JIM MCDONALD, Council President
Approved this ________ day of ________________________, 2012
_________________________________
PATTY LENT, Mayor
ATTEST: APPROVED AS TO FORM:
__________________________________ ________________________________
SHANNON CORIN, City Clerk ROGER A. LUBOVICH, City Attorney
4
2012 Comp Plan Amendment
PUBLISHED the________ day of ______________________, 2012
EFFECTIVE the_________day of ______________________, 2012
ORDINANCE NO. ____________
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Amendment to Interlocal
Agreement Regarding Emergency
Communications and Other Services
Study Session Date: 12-12-12
COUNCIL MEETING Date: 12-19-12
Department: Fire & Police
Presenter: Chiefs Duke & Rogers
Phone: 473-5380
SUMMARY: The CenCom Policy Board proposes to amend the Interlocal Agreement to allow the
Board to determine the funding formula and not have to change the Interlocal Agreement every time.
The Mayor, Councilmembers Arends and Wheeler are the members from the City of Bremerton that
sit on the thirteen member board. The second change would be if an entity chooses to terminate the
agreement, the entity would have to give a 180-day written notice; the agreement now is for 90-day
period.
ATTACHMENTS: Amendment to Interlocal Agreement Regarding Emergency Communications and
Other Services
Form Updated 11/02/12
COUNCIL ACTION: Approve Deny Table Continue No Action
RECOMMENDED MOTION:
Move to approve the Amendment to Interlocal Agreement Regarding Emergency Communications
and Other Services and authorize the Mayor to finalize and execute the Amendment with
substantially the same terms and conditions as presented.
STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing
STUDY SESSION AGENDA: ☐ No Discussion ☐ Full Presentation
FISCAL IMPACTS (Include Budgeted Amount): None
AMENDMENT TO INTERLOCAL AGREEMENT REGARDING
EMERGENCY COMMUNICATIONS AND OTHER SERVICES
This Amendment (this “Amendment”) to Interlocal Agreement Regarding Emergency
Communications and Other Services (the “Agreement”) is entered into between Kitsap Count y
(the “County”) and the below-named recipient (the “Recipient”).
RECITAL
WHEREAS, the parties entered into the Agreement and now wish to amend it as
provided herein;
NOW, THEREFORE, THE PARTIES AGREE AS FOLLOWS:
AGREEMENT
1. Definitions. The body of Title I(A), (J) and (K) – Definitions and Functions are
modified as follows:
A. Allocable proportion: The amount of money chargeable of Recipient as its
share of maintenance, operations, and insurance expenses for the emergency
communications system. The allocable proportion is determined by one of the
formula as adopted by the CENCOM Policy Board in Appendixes A or B to
this agreement.
. . . .
J. Criminal Justice Data Communications System- ACCESS: CENCOM is connected
to the Washington State Patrol ACCESS system for criminal history information.
Inasmuch as the involvement of the commissioned law enforcement authorities is
required in the management control of this system, the Sheriff and appointed Chiefs
of respective agencies are designated the CENCOM ACCESS Board as outlined in
Appendix A“C”.
. . . . .
K. Organizational Chart: The Organizational Chart is included as part of this Agreement
and identified as Appendix B“D”.
2
2. Payments. The body of Title III is modified as follows:
For emergency communications services for each calendar year
subsequent to the dates of this agreement, Recipient agrees to pay to County its
allocable proportion in twelve (12) equal monthly installments. The allocable
proportion for each calendar year due from Recipient is computed in accordance
with the formula adopted by the CENCOM Policy Board. as follows:
A. Fire District: Allocable proportion shall be computed as shown in
Appendix A;
B. County, a City, or Indian Tribe: Allocable proportion shall be computed
as shown in Appendix B.
C. Other Agency: Allocable proportion shall be determined by the Board.
3. Amendment. The body of Title VII – Amendment of the Agreement is modified as
follows:
It is specifically agreed by and between the parties hereto that this
Interlocal Agreement may be amended by the Board at any duly called regular or
special meeting of the Board, but only after first giving thirty (30) days written
notice of such meeting and proposed amendment to all parties to this agreement.
However, nothing in this paragraph shall be construed to authorize any change in
the funding formula set forth in this agreement nor to authorize any act which
would cause an increase, or change the amount paid by any participating agency
beyond the amount determined by the Board pursuant to this agreement.
4. Termination. The body of Title X – Termination of the Agreement is modified as
follows:
Either party to this Interlocal Agreement may terminate it by providing
written notice of such to the other at least ninety (90) one-hundred and eighty
(180) days prior to the specified termination date.; Provided, this Interlocal
Agreement can only be terminated at the end of a calendar year
5. Merger. The body of Title XI – Merger is modified as follows:
This Interlocal Agreement, including its appendicesconsisting of sixteen
(16) pages (including Appendixes A, B, and C and D), merges and supersedes all
prior negotiations, representations and oral or written agreements between the
parties hereto relating to subject matter hereof and constitutes the entire Interlocal
Agreement between the parties.
3
6. Appendix A. Appendix A is removed.
7. Appendix B. Appendix B of the Agreement is removed.
8. Appendix C. Appendix C of the Agreement is re-designated as Appendix A, but is
otherwise unchanged.
9. Appendix D. Appendix D of the Agreement is re-designated as Appendix B, but is
otherwise unchanged.
10. Scope of Amendment. Except as modified, the Agreement remains in effect.
11. Effective Date. This Amendment shall be effective as of ____________________.
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
4
IN WITNESS WHEREOF, the parties have subscribed their names to this Amendment
and warrant that they have the full authority to enter into it.
KITSAP COUNTY
BOARD OF COMMISSIONERS
KITSAP COUNTY, WASHINGTON
Robert Gelder, Chair
Josh Brown, Commissioner
Charlotte Garrido, Commissioner
ATTEST:
Dana Daniels, Clerk of the Board
Date
RECIPIENT
By:
Signature
Printed Name:
Title:
ATTEST:
By:
Signature
Printed Name:
Title:
Date
5
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Ordinance No. ____ amending
Ordinance No. 5173 establishing the City of
Bremerton’s Fiscal Year 2012 budget as
amended by Ordinance No. 5186.
Study Session Date: December 12, 2012
COUNCIL MEETING Date: December 19, 2012
Department: Finance
Presenter: Becky Hasart
Phone: 360-473-5722
SUMMARY: The Bremerton City Council adopted the 2012 Annual City Budget by Ordinance 5173
on December 14, 2011 and later amended the budget by Ordinance 5186 on June 6, 2012.
Subsequently, certain actions have been taken and conditions have changed which have an impact
on the final 2012 Annual Budget, resulting in the need for this amendment.
ATTACHMENTS: Ordinance No. _____ amending the 2012 Fiscal Year Budget
Final 2012 Budget Amendment memo
FISCAL IMPACTS (Include Budgeted Amount): Overall 2012 budget will be $147,318,714
STUDY SESSION AGENDA: ☐ No Discussion ☒ Full Presentation
STUDY SESSION ACTION: ☐ Consent Agenda ☒ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve Ordinance No. ____ of the City Council of the City of Bremerton, Washington,
amending Ordinance No. 5173 establishing the City of Bremerton’s Fiscal Year 2012 budget as
amended by Ordinance No. 5186.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/02/12
1 2012 Final Budget Adjustment
ORDINANCE NO. _____
AN ORDINANCE of the City Council of the City of
Bremerton, Washington, amending Ordinance No. 5173
establishing the City of Bremerton’s Fiscal Year 2012 budget as
amended by Ordinance No. 5186.
WHEREAS, the City Council passed the Fiscal Year 2012 City Budget Ordinance
(Ordinance No. 5173) on December 14, 2011; and
WHEREAS, the City Council subsequently amended the Fiscal Year 2012 City
Budget (Ordinance No. 5186) on June 6, 2012 to provide for certain programs and actions taken
up to that point requiring amendment to the 2012 budget; and
WHEREAS, the City Council has previously amended the budget by various
motions and resolutions subsequent to June 6, 2012 which require a formal amendment by
ordinance; and
WHEREAS, several City Departments and Funds are experiencing or anticipate
additional expenses due to factors such as costs related to provision of contracted services,
changed allocations of staff time, and the reallocation of prior period expenditures; and
WHEREAS, several City Departments and Funds require adjustment to revenues
to reflect activity in 2012 or timing changes from that which was anticipated in the 2012 budget;
and
WHEREAS, certain reclassifications of revenues and expenditures are required to
properly reflect budget categories in a manner consistent with actuals as classified in accordance
with Generally Accepted Accounting Principles; and
WHEREAS, each of these actions has an impact on the City of Bremerton’s FY
2012 Annual Budget resulting in the need to amend this Budget document;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON,
WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. Ordinance No. 5173 establishing the City of Bremerton’s 2012
Budget as amended by Ordinance No. 5186 is hereby amended as follows:
2 2012 Final Budget Adjustment
2012 Budget Final
as Amended by 2012 Year-End
Fund No.Ord No. 5186 Net Adjustments Budget
001 General Fund
City Council 332,770$ -$ 332,770$
Executive 370,360 - 370,360
Financial Services 1,153,840 - 1,153,840
Legal 981,650 - 981,650
Human Resources 398,010 - 398,010
Community Development 1,408,536 - 1,408,536
Municipal Court 1,294,187 - 1,294,187
City Auditor 170,960 - 170,960
Law Enforcement 9,598,837 - 9,598,837
Fire/Emergency Services 8,413,452 - 8,413,452
Police/Fire Pension 2,544,000 - 2,544,000
General Facilities 807,117 163,000 970,117
Parks & Recreation 2,608,741 - 2,608,741
Engineering 2,137,328 - 2,137,328
Non-Department 3,677,811 106,000 3,783,811
Ending Fund Balance 2,793,467 (269,000) 2,524,467
Total General Fund 38,691,066$ -$ 38,691,066$
101 Arterial Street 4,833,028 - 4,833,028
102 Street 2,484,029 65,000 2,549,029
103 Contingency Reserve 232,092 - 232,092
104 Lodging Tax 481,862 - 481,862
105 Parking System 1,430,814 - 1,430,814
106 Community Dev. Block Grant 2,900,531 - 2,900,531
108 Abatement Revolving 239,413 - 239,413
110 Police Special Projects 1,076,838 - 1,076,838
113 Public Access Television 457,708 - 457,708
114 Gift & Donation Fund 93,106 - 93,106
116 Trial Improvement 61,301 - 61,301
117 One Percent For Arts 51,670 - 51,670
120 Conference Center Operating 1,848,861 - 1,848,861
201 Bond Fund 729,792 - 729,792
203 2010 LTGO 704,763 - 704,763
204 2010 UTGO/LTGO (B)565,734 - 565,734
205 Government Center LTGO - 5,634,051 5,634,051
304 Harborside Plaza & Commons 34,336 60 34,396
305 Park Plaza Construction 351,648 - 351,648
306 Park Plaza Phase II 4,109,586 60 4,109,646
308 General Gov't Capital Improvement 542,522 - 542,522
310 Park Facilities Construction 1,754,369 - 1,754,369
311 Evergreen Park Remediation 80,081 - 80,081
331 Lower Wheaton Way 1,712,055 - 1,712,055
401 Water Utility 14,627,749 - 14,627,749
404 Water Capital 4,946,417 - 4,946,417
407 Golf Mountain Golf 2,413,539 - 2,413,539
451 Wastewater Utility 22,995,178 - 22,995,178
454 Wastewater Capital 9,662,189 - 9,662,189
481 Stormwater Utility 5,072,551 - 5,072,551
482 Gorst Creek Watershed 483,498 - 483,498
484 Stormwater Capital 3,081,029 - 3,081,029
503 Risk Management 3,223,483 - 3,223,483
506 Employment Security 271,954 - 271,954
507 Accumulated Leave Liability 256,906 - 256,906
509 ER&R - Operations & Maintenance 1,813,631 - 1,813,631
510 ER&R - Reserves 6,165,120 - 6,165,120
511 Information Services 1,139,094 - 1,139,094
Total All funds 141,619,543$ 5,699,171$ 147,318,714$
3 2012 Final Budget Adjustment
SECTION 2. That the totals for the funds noted in Section 1 above are hereby
appropriated for the fiscal year 2012.
SECTION 3. Severability. If any one or more sections, subsections, or
sentences of this Ordinance are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this Ordinance and the same shall remain in full
force and effect.
SECTION 4. Effective Date. This ordinance shall take effect and be in force ten
(10) days from and after its passage, approval and publication as provided by law.
PASSED by the City Council the___________ day of ____________________, 2012
_________________________________
JIM McDONALD, Council President
Approved this ________ day of ________________________, 2012
________________________________
PATTY LENT, Mayor
ATTEST: APPROVED AS TO FORM:
__________________________________ ________________________________
SHANNON CORIN, City Clerk ROGER A. LUBOVICH, City Attorney
PUBLISHED the________ day of ______________________, 2012
EFFECTIVE the_________day of ______________________, 2012
ORDINANCE NO. ______
Memorandum
To: City Council
Mayor Patty Lent
From: Caroline Tompson, Budget Analyst
Re: Final 2012 Budget Amendments
Date: December 12, 2012
The City adopted the 2012 budget by Ordinance No. 5173 on December 14,
2011 which was later amended by Ordinance No. 5186 on June 6, 2012. In
preparation for wrapping up 2012, it is necessary to do one last amendment to
the budget to incorporate Council actions that have occurred since the m id-year
budget amendment as well as to correct other items that have come to the
attention of the staff in Financial Services.
Enclosed is the final budget amendment ordinance and supporting schedules.
The adjustments identified are as follows:
Formally adopt and incorporate 2012 budget changes approved by council
subsequent to the mid-year budget amendment.
Reclassify expenditure categories as needed to properly reflect the
actuals as classified in accordance with Generally Accepted Accounting
Principles.
Reallocate $15,000 in Finance from personnel to supplies and services for
temp agency professional services. Zero net budget increase.
Increase care and custody expenditures in the amount of $106,000 for
medical costs and additional jail days in Non-Departmental.
Reallocate $30,000 in Court personnel to supplies and services for
additional public defender, jury trial, and court security costs. Zero net
budget increase.
Reallocate $10,410 in Police supplies and services budget to capital for
forensic equipment that exceeded the capitalization threshold. Zero net
budget increase.
2
Reallocate $60,000 in Fire supplies and services to personnel for
additional overtime. Zero net budget increase.
Increase General Facilities personnel for maintenance labor in excess of
estimates, $63,000.
Account for previously approved capital in General Facilities for
emergency generator at Fire Station #1, $100,000.
Reallocate personnel in Parks to capital for work performed on Parks
Construction projects, $27,400. Labor is paid under charges for services
in Parks revenue. Zero net budget increase.
Increase capital and debt service in Parks Capital Construction Fund for
2012 pool lighting upgrades, $42,500 and 2011 drain (safety) upgrades,
$14,100.
Increase capital, and charges for services under revenue, in Street Fund
for signal cabinet upgrades associated with Crosstown Pipeline Project,
$65,000.
Increase debt service in Fund 204 for additional fiscal agent fees
associated with BABS Subsidy calculation, $330.
Account for revenue, $5,634,051 and expenditures, $5,630,398 due to
previously approved Government Center debt refinancing in Government
Center LTGO Fund 205.
Increase transfer-out from Fund 304 to Fund 306 for closing out fund, $60.
Increase debt service in Golf to account for short-term interfund loan
interest to ER&R for previously approved capital equipment purchases,
$500.
Increase debt service for principal and interest on intergovernmental loans
in the Water Utility, $12,425, and Wastewater Utility, $14,500.
Account for additional claim expenses in the Risk Management Fund,
$30,000.
The budget adjustments are necessary to properly reflect the nature and extent
of revenues and expenditures of the various City funds and department s.
CITY OF BREMERTON
2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE
GENERAL FUND
For the Year Ended December 31, 2012
Amended Proposed Adj Required
Mid-Year Year-End From The
Budget Budget Amended Budget
2012 2012 2012
REVENUES
Taxes
Property $7,738,000 $7,738,000 $-
Sales 6,250,000 6,250,000 -
Other 7,980,900 7,980,900 -
Licenses and Permits 917,625 917,625 -
Intergovernmental 1,222,786 1,222,786 -
Charges for Services 5,284,900 5,284,900 -
Fines and Forfeitures 1,133,730 1,133,730 -
Miscellaneous 387,530 387,530 -
Transfers In & Other Financing 4,665,829 4,665,829 -
Total Revenues 35,581,300 35,581,300 -
EXPENDITURES
Personnel Expenses 26,585,400 26,636,500 51,100
Supplies, Services, and Taxes 7,897,852 7,977,942 80,090
Capital Expenditures 163,042 300,852 137,810
Debt Service 411,305 411,305 -
Transfers Out 840,000 840,000 -
Total Expenditures 35,897,599 36,166,599 269,000
CHANGES IN FUND BALANCE
Net change in fund balances (316,299) (585,299) (269,000)
Fund Balances-beginning 3,109,766 3,109,766 -
Fund Balances-ending $2,793,467 $2,524,467 $(269,000)
GENERAL FUND EXPENDITURES BY DEPARTMENT
City Council $332,770 332,770 $-
Executive 370,360 370,360 -
Financial Services 1,153,840 1,153,840 -
Legal Department 981,650 981,650 -
Human Resources 398,010 398,010 -
Community Development 1,408,536 1,408,536 -
Municipal Court 1,294,187 1,294,187 -
City Auditor 170,960 170,960 -
Police Department 9,598,837 9,598,837 -
Fire Department 8,413,452 8,413,452 -
Police & Fire Pension 2,544,000 2,544,000 -
General Facilities 807,117 970,117 163,000
Parks & Recreation 2,608,741 2,608,741 -
Engineering 2,137,328 2,137,328 -
Non-Departmental 3,677,811 3,783,811 106,000
Total Expenditures $35,897,599 $36,166,599 $269,000
The target ending fund balance is 8.5% of annual expenditures excluding capital. The target fund balance for the
2012 budget as amended is $3,048,589. The actual ending fund balance after the proposed amendments is
$2,524,467 which is lower than the target amount by $524,122. The financial planning goal is to bring the ending
fund balance level back up to where it meets or exceeds the target level.
FUND 001
CITY OF BREMERTON
2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE
GENERAL FUND
For the Year Ended December 31, 2012
Budget Adjustments:
Expenditure - increase capital for Fire Station #1 emergency generator (100,000)
Expenditure - decrease supplies in Police and reallocate to capital - forensic equipment purchase 10,410
Expenditure - increase capital in Police reallocated from supplies - forensic equipment purchase (10,410)
Expenditure - decrease personnel in Court & reallocate to supplies - public defense, jury trials and security 30,000
Expenditure - increase supplies in Court reallocated from personnel - public defense, jury trials & security (30,000)
Expenditure - increase supplies & services in Non-dep for additional prisoner jail days and medical expenses (106,000)
Expenditure - decrease supplies in Fire and reallocate to personnel for overtime expense 60,500
Expenditure - increase personnel reallocated from supplies and services in Fire (60,500)
Expenditure - increase capital expense for labor costs associated with work performed for capital parks projects (27,400)
Expenditure - decrease personnel reallocated to capital in Parks (reimbursed by charges for services)27,400
Expenditure - increase personnel in Facilities for add'l labor expense associated with City Facilities Maintenance (63,000)
Expenditure - decrease personnel expense in Finance and reallocate to supplies for temp employment services 15,000
Expenditure - increase supplies in Finance from reallocated personnel expense (15,000)
Net adjustment to ending fund balance required $(269,000)
Items Previously Approved by Council or Finance Committee
New Items Not Previously Approved by Council
FUND 001
CITY OF BREMERTON
2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE
STREET FUND
For the Year Ended December 31, 2012
Amended Proposed Adj Required
Mid-Year Year-End From The
Budget Budget Amended Budget
2012 2012 2012
REVENUES
Taxes
Property $$$-
Sales -
Other (parking tax)454,800 454,800 -
Licenses and Permits -
Intergovernmental (fuel tax)820,400 820,400 -
Charges for Services 145,000 210,000 65,000
Fines and Forfeitures -
Miscellaneous 51,800 51,800 -
Transfers in & Other Revenue 824,044 824,044 -
Total Revenues 2,296,044 2,361,044 65,000
EXPENDITURES
Personnel Expenses 1,196,900 1,196,900 -
Supplies, Services, and Taxes 1,084,587 1,084,587 -
Capital Expenditures 37,987 102,987 65,000
Debt Service -
Transfers Out -
Total Expenditures 2,319,474 2,384,474 65,000
CHANGES IN FUND BALANCE
Net change in fund balances (23,430) (23,430) -
Fund Balances-beginning 187,985 187,985 -
Fund Balances-ending $164,555 $164,555 $-
Budget Adjustments:
Revenue - increase charges for services for signal upgrades associated with Crosstown Pipeline Project 65,000
Expenditure - increase capital for signal improvements associated with Crosstown Pipeline Project (65,000)
Net adjustment to ending fund balance required $-
New Items Not Previously Approved by Council
FUND 102
CITY OF BREMERTON
2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE
2010 UTGO/LTGO (B)
For the Year Ended December 31, 2012
Amended Proposed Adj Required
Mid-Year Year-End From The
Budget Budget Amended Budget
2012 2012 2012
REVENUES
Taxes
Property $412,800 $412,800 $-
Sales -
Other -
Licenses and Permits -
Intergovernmental 37,675 37,675 -
Charges for Services -
Fines and Forfeitures -
Miscellaneous 650 650 -
Transfers in 72,500 72,500 -
Total Revenues 523,625 523,625 -
EXPENDITURES
Personnel Expenses -
Supplies, Services, and Taxes -
Capital Expenditures -
Debt Service 520,775 521,105 330
Transfers Out -
Total Expenditures 520,775 521,105 330
CHANGES IN FUND BALANCE
Net change in fund balances 2,850 2,520 (330)
Fund Balances-beginning 42,109 42,109 -
Fund Balances-ending $44,959 $44,629 $(330)
Budget Adjustments:
Expenditure - increase debt service fees for BABS Subsidy calculation (330)
Net adjustment required to the ending fund balance $(330)
New Items Not Previously Approved by Council
FUND 204
CITY OF BREMERTON
2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE
GOVERNMENT CENTER LTGO
For the Year Ended December 31, 2012
Amended Proposed Adj Required
Mid-Year Year-End From The
Budget Budget Amended Budget
2012 2012 2012
REVENUES
Taxes
Property $$$-
Sales -
Other -
Licenses and Permits -
Intergovernmental -
Charges for Services -
Fines and Forfeitures -
Miscellaneous - -
Transfers in & Other Revenue - 5,634,051 5,634,051
Total Revenues - 5,634,051 5,634,051
EXPENDITURES
Personnel Expenses - -
Supplies, Services, and Taxes - -
Capital Expenditures -
Debt Service 5,630,398 5,630,398
Transfers Out - -
Total Expenditures - 5,630,398 5,630,398
CHANGES IN FUND BALANCE
Net change in fund balances - 3,653 3,653
Fund Balances-beginning -
Fund Balances-ending $- $3,653 $3,653
Budget Adjustments:
Revenue - increase collection of receivables and proceeds from debt refinancing 5,634,051
Expenditures - increase debt service costs for government center refinancing (5,630,398)
Net adjustment required to the ending fund balance $3,653
Items Previously Approved by Council
FUND 205
CITY OF BREMERTON
2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE
HARBORSIDE PLAZA & COMMONS
For the Year Ended December 31, 2012
Amended Proposed Adj Required
Mid-Year Year-End From The
Budget Budget Amended Budget
2012 2012 2012
REVENUES
Taxes
Property $$$-
Sales -
Other -
Licenses and Permits -
Intergovernmental - - -
Charges for Services - -
Fines and Forfeitures - -
Miscellaneous - - -
Transfers in & Other Revenue - -
Total Revenues - - -
EXPENDITURES
Personnel Expenses -
Supplies, Services, and Taxes -
Capital Expenditures - - -
Debt Service -
Transfers Out 34,336 34,396 60
Total Expenditures 34,336 34,396 60
CHANGES IN FUND BALANCE
Net change in fund balances (34,336) (34,396) (60)
Fund Balances-beginning 34,336 34,396 60
Fund Balances-ending $- $- $-
Budget Adjustments:
Expenditure - increase transfer-out to close out fund (housekeeping)(60)
Net adjustment required to the ending fund balance $(60)
New Items Not Previously Approved by Council
FUND 304
CITY OF BREMERTON
2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE
PARK PLAZA PHASE II
For the Year Ended December 31, 2012
Amended Proposed Adj Required
Mid-Year Year-End From The
Budget Budget Amended Budget
2012 2012 2012
REVENUES
Taxes
Property $$$-
Sales -
Other -
Licenses and Permits -
Intergovernmental 1,960,331 1,960,331 -
Charges for Services - - -
Fines and Forfeitures - -
Miscellaneous 5,444 5,444 -
Transfers in & Other Revenue 1,127,836 1,127,896 60
Total Revenues 3,093,611 3,093,671 60
EXPENDITURES
Personnel Expenses -
Supplies, Services, and Taxes -
Capital Expenditures 3,909,586 3,909,586 -
Debt Service - -
Transfers Out 200,000 200,000 -
Total Expenditures 4,109,586 4,109,586 -
CHANGES IN FUND BALANCE
Net change in fund balances (1,015,975) (1,015,915) 60
Fund Balances-beginning 1,015,975 1,015,975 -
Fund Balances-ending $- $60 $60
Budget Adjustments:
Revenue - increase transfer-in from Fund 304 closing out fund (housekeeping)60
Net adjustment required to the ending fund balance $60
New Items Not Previously Approved by Council
FUND 306
CITY OF BREMERTON
2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE
PARK FACILITIES CONSTRUCTION FUND
For the Year Ended December 31, 2012
Amended Proposed Adj Required
Mid-Year Year-End From The
Budget Budget Amended Budget
2012 2012 2012
REVENUES
Taxes
Property $$$-
Sales -
Other -
Licenses and Permits -
Intergovernmental 745,000 745,000 -
Charges for Services - -
Fines and Forfeitures - -
Miscellaneous 225,000 225,000 -
Transfers in & Other Revenue 421 421 -
Total Revenues 970,421 970,421 -
EXPENDITURES
Personnel Expenses -
Supplies, Services, and Taxes - - -
Capital Expenditures 1,334,000 1,376,500 42,500
Debt Service 5,700 19,800 14,100
Transfers Out - - -
Total Expenditures 1,339,700 1,396,300 56,600
CHANGES IN FUND BALANCE
Net change in fund balances (369,279) (425,879) (56,600)
Fund Balances-beginning 783,948 783,948 -
Fund Balances-ending $414,669 $358,069 $(56,600)
Budget Adjustments:
Expenditure - increase capital expense for pool lighting upgrades (42,500)
Expenditure - increase debt service for pool upgrades (14,100)
Net adjustment required to the ending fund balance $(56,600)
New Items Not Previously Approved by Council
FUND 310
City of Bremerton
2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE
WATER UTILITY
For the Year Ended December 31, 2012
Amended Proposed Adj Required
Mid-Year Year-End From The
Budget Budget Amended Budget
2012 2012 2012
REVENUES
Taxes
Property $$$-
Sales -
Other -
Licenses and Permits -
Intergovernmental - -
Charges for Services 9,073,900 9,073,900 -
Fines and Forfeitures - - -
Miscellaneous 326,392 326,392 -
Transfers in & Other Revenue 10,290 10,290 -
Total Revenues 9,410,582 9,410,582 -
EXPENDITURES
Personnel Expenses 3,762,140 3,762,140 -
Supplies, Services, and Taxes 3,511,080 3,511,080 -
Capital Expenditures - - -
Debt Service 723,062 735,487 12,425
Transfers Out 5,496,467 5,496,467 -
Total Expenditures 13,492,749 13,505,174 12,425
CHANGES IN WORKING CAPITAL BALANCE
Net change in working capital (4,082,167) (4,094,592) (12,425)
Fund Balances-beginning working capital 5,217,167 5,217,167 -
Fund Balances-ending working capital $1,135,000 $1,122,575 $(12,425)
Budget Adjustments:
Expenditure - increase debt service principal payment (housekeeping)(12,425)
Net adjustment required to the ending fund balance $(12,425)
New Items Not Previously Approved by Council
The target ending fund balance is 12% of annual expenditures excluding transfers for capital. The target fund balance for the
2012 budget as amended is $1,136,491. Projected Balance is $1,122,575 after proposed amendments are completed - which
is slightly below target.
FUND 401
CITY OF BREMERTON
2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE
GOLD MOUNTAIN GOLF COMPLEX
For the Year Ended December 31, 2012
Amended Proposed Adj Required
Mid-Year Year-End From The
Budget Budget Amended Budget
2012 2012 2012
REVENUES
Taxes
Property $$$
Sales
Other
Licenses and Permits
Intergovernmental
Charges for Services 1,950,000 1,950,000 -
Fines and Forfeitures -
Miscellaneous 89,000 89,000 -
Transfers in - - -
Total Revenues 2,039,000 2,039,000 -
EXPENDITURES
Personnel Expenses
Supplies, Services, and Taxes 1,812,254 1,812,254 -
Capital Expenditures 295,500 295,500 -
Debt Service 285,705 286,205 500
Transfers Out - - -
Total Expenditures 2,393,459 2,393,959 500
CHANGES IN FUND BALANCE
Net change in working capital (354,459) (354,959) (500)
Fund Balances-beginning working capital 374,539 374,539 -
Fund Balances-ending working capital $20,080 $19,580 $(500)
Budget Adjustments:
Expenditure - increase for debt service fee's associated with short-term interfund loan from ER&R (500)
Net adjustment required to the ending fund balance $(500)
Items Previously Approved by Council
The target ending fund balance is 12% of annual expenditures excluding capital. The target fund balance for the 2012 budget
as amended is $251,815. Projected Balance is $19,580 after proposed amendments are completed - which does not meet the
target level.
FUND 407
CITY OF BREMERTON
2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE
WASTEWATER UTILITY
For the Year Ended December 31, 2012
Amended Proposed Adj Required
Mid-Year Year-End From The
Budget Budget Amended Budget
2012 2012 2012
REVENUES
Taxes
Property $- $- $-
Sales - -
Other - - -
Licenses and Permits - - -
Intergovernmental - - -
Charges for Services 13,612,612 13,612,612 -
Fines and Forfeitures - -
Miscellaneous 27,500 27,500 -
Transfers in & Other Revenue - -
Total Revenues 13,640,112 13,640,112 -
EXPENDITURES
Personnel Expenses 2,655,090 2,655,090 -
Supplies, Services, and Taxes 4,066,616 4,066,616 -
Capital Expenditures - - -
Debt Service 2,823,563 2,838,063 14,500
Transfers Out 11,977,232 11,977,232 -
Total Expenditures 21,522,501 21,537,001 14,500
CHANGES IN FUND BALANCE
Net change in working capital (7,882,389) (7,896,889) (14,500)
Fund Balances-beginning working capital 9,355,066 9,355,066 -
Fund Balances-ending working capital $1,472,677 $1,458,177 $(14,500)
Budget Adjustments:
Expenditure - increase debt service for principal and interest on intergovernmental loans (14,500)
Net adjustment required to the ending fund balance $(14,500)
New Items Not Previously Approved by Council
The target ending fund balance is 12% of annual expenditures excluding transfers for capital. The target fund balance for the
2012 budget as amended is $1,474,417. Projected balance is $1,472,677 after proposed amendments are completed - which
is slightly below the target level.
FUND 451
CITY OF BREMERTON
2012 ANTICIPATED REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE
RISK MANAGEMENT INTERNAL SERVICE FUND
For the Year Ended December 31, 2012
Amended Proposed Adj Required
Mid-Year Year-End From The
Budget Budget Amended Budget
2012 2012 2012
REVENUES
Taxes
Property $$$-
Sales -
Other -
Licenses and Permits -
Intergovernmental -
Charges for Services -
Fines and Forfeitures -
Miscellaneous 1,429,900 1,429,900 -
Transfers in -
Total Revenues 1,429,900 1,429,900 -
EXPENDITURES
Personnel Expenses 240,000 240,000 -
Supplies, Services, and Taxes 1,189,900 1,219,900 30,000
Capital Expenditures -
Debt Service -
Transfers Out -
Total Expenditures 1,429,900 1,459,900 30,000
CHANGES IN FUND BALANCE
Net change in working capital - (30,000) (30,000)
Fund Balances-beginning working capital 1,793,583 1,793,583 -
Fund Balances-ending working capital $1,793,583 $1,763,583 $(30,000)
Budget Adjustments:
Expenditures - Increase supplies and services due to additional unforeseen claim payments (30,000)
Net adjustment required to the ending fund balance $(30,000)
New Items Not Previously Approved by Council
FUND 503
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Ordinance No. _____ amending
Chapter 9.88 of the Bremerton Municipal
code entitled “Marijuana.”
Study Session Date: December 12, 2012
COUNCIL MEETING Date: December 19, 2012
Department: City Attorney’s Office
Presenter: Roger A. Lubovich
Phone: 360-473-2345
SUMMARY: Due to the recent passage of Initiative 502, it is necessary to amend the City’s code
relating to marijuana to be consistent with the new law.
ATTACHMENTS: Proposed Ordinance ______
FISCAL IMPACTS (Include Budgeted Amount): None
STUDY SESSION AGENDA: ☐ No Discussion ☒ Full Presentation
STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to pass Ordinance No. ______ amending Chapter 9.88 of the Bremerton Municipal code
entitled “Marijuana.”
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/02/12
1
Marijuana
ORDINANCE NO. ________
AN ORDINANCE of the City Council of the City of
Bremerton, Washington, amending Chapter 9.88 of the Bremerton
Municipal code entitled “Marijuana.”
WHEREAS, the current provisions of Chapter 9.88 of the Bremerton Municipal
Code relating to marijuana are no longer consistent with recent changes to state law as a result of
Initiative Measure 502 recently passed by the voters; and
WHEREAS, the City Council desires to update the provisions relating to
marijuana in order to be consistent with state law; NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. Chapter 9.88 of the Bremerton Municipal Code entitled
"Marijuana" is hereby amended to read as follows:
Chapter 9.88
MARIJUANA
9.88.010 DEFINITIONS.
"Drug paraphernalia" is defined as currently set forth in RCW 69.50.102, or hereinafter
amended.
"Marijuana" is defined as: All parts of the plant of the genus Cannabis L., whether
growing or not; the seeds thereof; the resin extracted from any part of the plant; and every
compound, manufacture, salt, derivative, mixture, or preparation of the plant, its seeds or resin. It
does not include the mature stalks of the plant, fiber produced from the stalks, oil or cake made
from the seeds of the plant, any other compound, manufacture, salt, derivative, mixture or
preparation of the mature stalks (except the resin extracted therefrom), fiber, oil or cake, or the
sterilized seed of the plant which is incapable of germination.
The following definitions are hereby adopted:
(a) RCW 69.50.101 entitled “Definitions” is hereby adopted by reference as
currently enacted and as hereinafter amended from time to time, and shall be given the same
force and effect as if set forth herein in full.
(b) RCW 69.50.102 entitled “Drug paraphernalia – Definitions” is hereby adopted by
reference as currently enacted and as hereinafter amended from time to time, and shall be given
the same force and effect as if set forth herein in full.
9.88.020 MARIJUANA POSSESSION.
Any person found guilty of possession of forty (40) grams or less of marijuana shall be
guilty of a misdemeanor. RCW 69.50.4013, with the exception of those provisions contained
therein for which a violation constitutes a felony crime, is hereby adopted by reference as
Formatted: Outline numbered + Level: 2 +
Numbering Style: a, b, c, … + Start at: 1 +
Alignment: Left + Aligned at: 0.5" + Tab after:
0.5" + Indent at: 0"
2
Marijuana
currently enacted and as hereinafter amended from time to time, and shall be given the same
force and effect as if set forth herein in full.
9.88.030 POSSESSION OF DRUG PARAPHERNALIA.
RCW 69.50.412, with the exception of those provisions contained therein for which a
violation constitutes a felony crime, is hereby adopted by reference as currently enacted and as
hereinafter amended from time to time, and shall be given the same force and effect as if set
forth herein in full.
9.88.040 MISDEMEANOR VIOLATIONS - MINIMUM
IMPRISONMENTPENALTIES.
RCW 69.50.425 is hereby adopted by reference as currently enacted and as hereinafter
amended from time to time, and shall be given the same force and effect as if set forth herein in
full. A person who is convicted of a misdemeanor violation of BMC 9.88.020 or BMC 9.88.030
shall be subject to punishment pursuant to RCW 69.50.425. punished by imprisonment for not
less than twenty-four (24) consecutive hours, and by a fine of not less than two hundred fifty
dollars ($250.00). On a second or subsequent conviction, the fine shall not be less than five
hundred dollars ($500.00). These fines shall be in addition to any other fine or penalty imposed.
Unless the court finds that the imposition of the minimum imprisonment will pose a substantial
risk to the defendant's physical or mental well-being or that local jail facilities are in an
overcrowded condition, the minimum term of imprisonment shall not be suspended or deferred.
If the court finds such risk or overcrowding exists, it shall sentence the defendant to a minimum
of forty (40) hours of community service. If a minimum term of imprisonment is suspended or
deferred, the court shall state in writing the reason for granting the suspension or deferral and the
facts upon which the suspension or deferral is based. Unless the court finds the person to be
indigent, the minimum fine shall not be suspended.
9.88.050 MARIJUANA - IN VIEW OF GENERAL PUBLIC - INFRACTION.
Chapter 69.50 RCW, Initiative No. 502 Section 21 (Judicial Information System No.
13C3521) relating to the opening, use or consumption of marijuana, usable marijuana or
marijuana –infused products in view of the general public is hereby adopted by reference as
currently enacted and as hereinafter amended from time to time, and shall be given the same
force and effect as if set forth herein in full. A person who violates this section is guilty of a class
3 civil infraction pursuant to RCW 7.80.120(1)(c) as currently enacted and as hereinafter
amended from time to time.
SECTION 2. Severability. If any one or more sections, subsections, or
sentences of this Ordinance are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this Ordinance and the same shall remain in full
force and effect.
SECTION 3. Effective Date. This ordinance shall take effect and be in force ten
(10) days from and after its passage, approval and publication as provided by law.
PASSED by the City Council the___________ day of ____________________, 2012
Formatted: Normal, Indent: First line: 0.5"
3
Marijuana
_________________________________
JIM McDONALD, Council President
Approved this ________ day of ________________________, 2012
_________________________________
PATTY LENT, Mayor
ATTEST: APPROVED AS TO FORM:
__________________________________ ________________________________
SHANNON CORIN, City Clerk ROGER A. LUBOVICH, City Attorney
PUBLISHED the________ day of ______________________, 2012
EFFECTIVE the_________day of ______________________, 2012
ORDINANCE NO. ____________
R:\Legal\Legal\Ordinances\legal\Marijuana (2012)1.doc