HomeMy WebLinkAbout11/14/2012 AGENDA aI ? IvP
CITY COUNCIL 345 6th Street, Suite 600, Bremerton, WA 98337 ❑ Phone (360) 473 -5280
** *AMENDED * **
NOVEMBER 14, 2012
CITY COUNCIL STUDY SESSION
4:00 PM in MAYOR'S CONFERENCE ROOM
(Please note earlier start-time and new location for this meeting only...)
The Study Session is open to the public but there will be no opportunities for input or participation, no
action is anticipated during the Study Session, and the content of these items is subject to change If
approved by Council, the items will be placed on the December 5, 2012 Council Meeting Agenda
A NO PRESENTATION PLANNED -The following items are budgeted items or have been
reviewed by the appropriate Council Committee
1 Contract Modification for long -term groundwater monitoring at former Chevron Property —
Tom Knuckey, City Engineer, Public Works & Utilities Department
2 Agreed Order with Department of Ecology for monitoring and reporting at former Chevron
Property — Tom Knuckey, City Engineer, Public Works & Utilities Department
3 Ordinance to repeal Chapter 2 43 of the Bremerton Municipal Code (BMC) regarding the
Gold Mountain Complex Board of Directors — Wyn Birkenthal, Parks & Recreation Director
B FULL DISCUSSION ITEMS
4 2012 United Way Campaign Briefing — Shannon Conn, City Clerk
5 Adopt Kitsap Regional Coordinating Council (KRCC) Interlocal Agreement 2012
Amendments — Mary McClure, KRCC Executive Director
6 Appointment of Public Works Administration Division Manager at a Step Higher than Rate 1
in Band 11 - Chal Martin, Public Works & Utilities Director (Action is anticipated...)
7 Utility Rate Study "Fee Structure & Classifications" — Becky Hasart, Financial Services
Director, FCS Group, and Utility Rate Study Advisory Committee
8 BUDGET WORKSHOP: No discussion held
C GENERAL COUNCIL BUSINESS
D ADJOURN STUDY SESSION
® Amencans with Disabilities Act accommodations provided upon request Those requiring special accommodations
should contact the City Cleric's Office at (360) 473 -5323 by noon on the Monday preceding the Council meeting
AGENDA BILL
CITY OF BREMERTON ?P&D
CITY COUNCIL
SUBJECT: Appointment of Public Works Study Session Date 11/14/2012
Administrative Division Manager at a step COUNCIL MEETING Date 11/14/2012
higher than Rate 1 in Pay Band 11 Department Public Works & Utilities
Presenter Chal Martin
Phone 473 -5315
SUMMARY: The Director of Public Works & Utilities proposes to fill the vacant Public Works
Administrative Division Manager position with Milenka Hawkins -Bates Mrs Hawkins - Bates' career
spans 10 years in the public sector including 5 years experience as the Public Works Director and 5
years as the Administrative Assistant to the Public Works Director for the City of Sonoma, California
The Director has negotiated a starting salary with the applicant and proposes making this
appointment at Rate 4 in Pay Band 11 Per BMC 2 50.032(a), City Council must approve the initial
salary of a newly hired person d the starting salary exceeds Rate 1
ATTACHMENTS: Resume, Letter of Engagement outlining the negotiated terms of her employment
with the City of Bremerton, and a copy of Pay Band 11
FISCAL IMPACTS (Include Budgeted Amount). Position is fully funded
APPROVALS:
DEPARTMENT DIRECTOR
CITY ATTORNEY
FINANCE DIRECTOR
MAYOR
RECOMMENDED MOTION:
Move to approve the hire of Milenka Hawkins -Bates at Rate 4 in Pay Band 11
STUDY SESSION ACTION: ❑ Consent Agenda ❑ Ge eral Business ❑ Public Hearing
COUNCIL PRESIDENT
COUNCIL ACTION: KApprove ❑ Deny ❑ Table ❑ Continue ❑ No Action
Forth Updated 11/02/2011
i
I
I N G
p^4
DEPARTMENT OF PUBLIC WORKS & UTILITIES
Te136R473 =5315-
Far 360- 473 -5278 ,
et "
100 Oyster Bay
`Bremerton, WA 98312 F
November 13, 2012
Mdenka Hawkins -Bates
Dear Mrs Hawkins -Bates
It is with great pleasure that I confirm your appointment to the position of Public Works
Administrative Division Manager This letter will serve to confirm your employment with the City
of Bremerton as follows
Position Administrative Division Manager
Department Public Works & Utilities
Effective Date December 31, 2012
Rate of Pay $5,923 46 Monthly (Band 11, Rate 4) — Contingent
Upon Council Approval
Appointment/Removal Authority Director of Public Works & Utilities
Benefits Per Bremerton Municipal Code 2 50
Please sign on the next page indicating your acceptance of our offer of employment as outlined
above, and return to Charlotte Belmore in our Human Resources Office at 345 6"' Street, Suite
600 Bremerton, WA 98337
Sincerely,
Ecu
Chal Martin
Director of Public Works & Utilities
• Page 2 November 13, 2012
I, Mdenka Hawkins- Bates, hereby accept employment with the City of Bremerton as the
Administration Division Manager, effective December 31, 2012 under the terms and conditions
set forth in this Letter of Engagement
SIGNATURE.
Mdenka Hawkins -Bates Date
RESUME
Milenka Hawkins-Bates
Sonoma, CA 95476
OBJECTIVE To be named the City of Bremerton Administrative Division Manager for
Public Works
Present Appointed to the position of Public Works Director, April 12, 2008
April 12, 2008 City of Sonoma Public Works
January 2, 2008 Acting Public Works Director
Responsibilities include planning, directing and reviewing the activities and
operations of the Public Works Department; I serve as the principal liaison to the
Sonoma County Water Agency, San Francisco Regional Water Quality Control
Board and other outside agencies
Work with staff to develop, plan and implement department goals, objectives,
policies and procedures Assist in the preparation of the City's long -range public
works infrastructure plans and programs.
Prepare agenda items for the City Council and other boards and commissions
Responsible for the preparation and implementation of department budgets and
provide revenue protections and cost controls, project funds needed for staffing,
equipment, materials and supplies for water, parks, streets and cemeteries
Coordinate department activities with those of other departments, the City
Engineer and outside agencies and organizations Provide staff assistance to the
City Manager and City Council, prepare and present staff reports and other
necessary correspondence.
Participate in the development of the Departments work plan, assign work
activities, projects and programs Monitor workflow, review and evaluate work
products, methods and procedures
Assist with the preparation of the capital improvement budget, prepare estimates
and reports for construction projects, plan and recommend projects for the City's
five -year capital improvement plan
Establish construction inspection procedures; Review status of projects with the
Public Works Inspectors and City Engineer and provide direction as needed
Assist with the preparation of applications for State and Federal funding for
construction projects, and administer projects in accordance with grant approvals
Continuously monitor and evaluate the efficiency and effectiveness of service
delivery methods and procedures. Routinely assess and monitor department
workload Identify opportunities for improvement and take action to implement
change.
Respond to and resolve difficult and sensitive citizen inquiries and complaints.
Involve all departments of Public Works in disaster preparedness planning
activities
m Bates
Page 2
December 28, 2007 - City of Sonoma Public Works
October 2007 Acting Assistant Public Works Director
Aged as the Public Works Director in his absence Responsible for seeing that
routine, scheduled public work tasks were accomplished and that staff response to
service requests, complaints and emergencies were appropriate in terms of
response time and follow -up action
Ensure that administrative and capital projects assigned to the Public Works
Department met established benchmarks and that regular reporting deadlines were
met, especially to Regional, State and Federal regulatory agencies
Represented the Public Works Director at City and area -wide meetings in his
absence.
October 2002- City of Sonoma Public Works
October 2007 Administrative Assistant to the Public Works Director
Administrative Assistant to the Public Works Director
Areas of emphasis included broad application of environmental and regulatory
programs. Departments receiving direct assistance for programs, funding, and
infrastructure maintenance included Water, Parks, Street, and Cemetery. (Please
see attached addendum for more comprehensive list of projects and responsibility
involvement.
October 2002 - Transportation & Logistics Consultant
January 2001 Harwood Lumber Products, Branscomb, CA
Annual savings achieved $ 250,000 Savings to the annual operating budget
achieved by restructuring the shipping, trucking and freight departments
Procedures were evaluated, employees participated and new vendor opportunities
were identified.
September 2000 - Sales Manager
March 1997 Sierra Pine Ltd.
Weyerhaeuser Company
Particleboard Mill, Springfield, OR
Member of upper management team Successfully managed order file to suit
needs of mill and customers Responsibilities included remote inventories, export
documentation and packaging program. Supervised in house staff of three and
twenty -four remote sales managers. Transidoned Customers and staff through
seamless acquisition of Composite Products Division from Weyerhaeuser Co to
Sierra Pine Ltd
March 1997 - Transportation a Logistics Analyst
October 1989 Weyerhaeuser Company, Federal Way, WA
Negotiated $350,000 Demurrage Savings with Union Pacific Railroad, negotiated
rail freight and railcar leasing contrails Developed on-tims shipping incentives for
Southern Pacific Railroad Led department in Customer Service achievements and
initiated company wide Recognition & Awards Program ReceNW *Nine Dot"
Award for thinking outside of my duties and responsibilities, also received Railroad
Recognition Service Award. Prepared Business Disaster Recovery Plan for
Department, led department through disaster recovery training exercises.
May 1987 — Human Resource Manager
March 1984 Green River Sportswear, Tacoma, WA
Broad range of responsibilities for 250 employees Screening, hiring, training,
payroll, and disciplinary actions Initiated safety programs, reported on OSHA and
tracked Affirmative Action
EDUCATION Completing Bachelor of Science, Business Administration
City University of Seattle, Bellevue, WA
TRAINING ■ Negod dng — Gelling to YES • Leadership Institute, (Four Week course over
■ Erosion & Sedrnent Control 1 year) Federal Way, WA
■ Construc lim Site Inspection ■ Protect Management -Covey
■ Illicit Discharge and Detectiori Etinanallm ■ Effective Reports, Proposals, & Memos
■ Site Inspection to Itiiat Dis Imp ■ Various micro-Soft Courses
• Grant Writing & Preparation ■ Sbmwa* Podudon Prevention Plan
• Arclfiew — GISIGPS Training for Mum
■ Excel 1, 11, Advanced • AWWA — Dare to Prepare Golfing your
■ AWWA— Emergency Response Training UBity Ready for the Worst
■ Vector & Mosqulto Control ■ Water Security Trahing — VSAT
Business r ■ ARQCB — Limiting Air Emissions
SKILLS ■ Rged Management • Report Preparation
• Faditahon & Mediation ■ Cammunkahon Verbal & Written
■ Analytical Analysis ■ Pubtic Spealdng
■ Leader" ■ Crganumbonal Skis
■ Profkaent in Word, Excel, PowerPoint, ■ Total Quality Management (TQM)
Publisher, Access, Web appfi d^ Arc • Budget Development & Control
View GISIGPS, MOMs ■ Pr=rement
INTERESTS Winemaking, Soccer Coach, Sonoma Valley Untied Soccer League (ages 6-12)
Gardening, Sailing, Camping, Sluing, Reading
ADDENDUM
City of Sonoma, Public Works Departrnent
Projects & Responsibilities
• NPDES Phase 11 Storm Water Management Plan (SWK"
o Re -wrote SWMP for Regional Water Quality Control Board ( RWCCB) Acceptance
o Developed Ordinance for Stormwater Management & Discharge
o Developed Construction Site Runoff Control Guidelines
o Implemented Best Management Practices (BMPs) on schedule with plan
o Responsible for City's Annual Report to the RWQCB
• Annual Report used by RWQCB as an example for other Phase II Communities
o Leader of Phase 11 Community Work Group - Napa, Solano, Sonoma Storrnwater Agencies
o Conducted restaurant, business, and construction site inspections for stonnwater compliance
o Investigated and reported actions taken with Illicit Discharge complaints
o Participated In TMOL Grant/ Project with various agencies
o Participated in Sonoma Creek Watershed Grant, various agencies
o Participated in Critical Coastal Project — Sonoma Creek, vanous agencies
• Implemented and managed Graffiti Abatement Task Force
• Implemented and managed Adopt A Bike Path Program
• Participated in the 2007, Participated and Managed 2010, 2012 Water Connection Charge and Rate Study
• Participated in the 2005, Managed 2010 Urban Water Management Plan
• Negotiate purchased water delivery and rates Tracked City Well and Purchased water usage
• Participated and wrote Vulnerability Assessment Plan for Water Departrnent / OES
• Managed State required Backflow Prevention Program
• Annually wrote and maintained Bacteriological Sampling Plan for Department of Health Services (DHS)
• Prepared Water Quality Report for Department of Public Health
• Documented, tracked and reported on water quality complaints
o Wrote and submitted annual Consumer Confidence Report (CCR) DPH requirement
• Tracked Valve Activation & Fire Hydrant testing
• RFP/ RFQ Contract Document preparation
• Integrated Pest Management Program OPM)
• Managed the budget process and planning Routinely met budget revenue projections
o Initiated and maintained `Our Water Our World' (OWOW) program at local hardware stores
• Automatic Meter Read Project (AMR) Pilot Program & Implementation
• Manage Special Events
• Tracked property damages, initiated property damage claims
• Explored Grant opportunities, submitted Grant documents, received Grants, and administered Grants
• Tracked and Implemented cydk: programs in all divisions of public works
• Appointed as a rnember of the Budget Advisory Committee and Water Technical Advisory Committee
• Member of the Sonoma Valley Groundwater Basin Advisory Committee
• Received with Water Department American Water Works Assoc (AW WA) Energy Savings Award
I
CITY OF BREMERTON
MANAGEMENT, PROFESSIONAL, CONFIDENTIAL & FIDUCIARY SALARY PLAN - 2013
CPI Adjusted Base 0 00% - Effective 1 -1 -13
PAY S ALARY
BANC TITLE BASE RATE 1 RATE 2 RATE 3 RATE 4 RATE 5 RATE 6 RATE 7 RATE 8
14 ASSISTANT FINANCE OFFICER MONTH 6,22334 6,53842 6,70188 6,86944 7,041 18 7,21720 7,39760 7 582 56
PUBLIC WORKS & UTILITY FINANCE MANAGER SEMI -MONTH 3,11167 3,26921 3,35094 3,43472 3,52059 3,60860 3,69880 3,79128
ANNUAL _ _ _7_4,680 08 78,481 04 _ 80,422_56 82,433 28 84,49416 86,60640_ 88,77120 90,990 72
2EMI -MO DEF COMP 12447 13077 134.041 13739 140 82 144.34 147 98 161 65
13 ASSISTANT CITY ATTORNEY I MONTH 5,92346 622334 6,37894 6,53842 6,70188 6,86944 7,04118 7.21720
FLEET MANAGER SEMI -MONTH 2,96173 3,11167 3,18947 3,26921 3,35094 3,43472 3,52059 3,60860
ANNUAL _ _ 71,081 82 74,680 08 76,547 28 78,461 04 80,422 56 82,43328 84,49418 86,60640
SEMI -MO DEF COMP - 11847 - - 124 47 - 127 68 13077 - 13404 13739 140 82 144.34
12 ATHLETICSIRECREATION MANAGER MONTH 5,63806 5,92346 6,07158 6,22334 637894 6,53842 6,70188 6,86944
CDBG ADMINISTRATOR SEMI -MONTH 2,81903 2,961 73 3,03579 3,11167 3 189 47 3,26921 3,35094 3 434 72
PARKS MAINTENANCE MANAGER ANN 8 72 71,08152 72,858 98 74,680 08 76,547 28 78,461 04 80,422 56 82,433 28
1 POLICE SUPPORT MANAGER SEMI -MO DEF COMP 11276 118 47 12143 - - 124 47 127 58 130 77 13404 197 39
RISK MANAGEMENT SPECIALIST
11 ADMINISTRATION DIVISION MANAGER MONTH 5,36638 5,63806 5,77900 5,92346 6,07158 6,22334 6,37894 6,63842
EXECUTIVE ASSISTANT SEMI -MONTH 2,68319 2,81903 2,88950 2,96173 3.03579 3.11167 3,18947 3,26921
LEGISLATIVE ASSISTANT ANNUAL _ 64,39888 67,888 72 6_9,348 00 71,081 52 7_2,88898 74,68008 76,54728 78,48104
PARALEGAL SEMI -MO DEF COMP 10733 112.78 11558 118 47 121A3 12447 127 Be 130 77
PARK DEVELOPMENT PLANNER
PUBLIC ACCESS MANAGER
SENIOR PLANNER
10 BUDGET ANALYST MONTH 5,10778 5,36638 5,50056 5,63806 5,77900 592346 6,07158 6,22334
CDBG COORDINATOR SEMI -MONTH 2,55389 2,68319 2 750 28 2,81903 2,88950 2,96173 3,03579 3,11167
HR ANALYST II ANNUAL _ 81,293 38 64, 66,006 72 67,656 72 69,348 00 71,081 52 72,85896 74,680 08
PROSECUTOR II SEMI-11110 DEF COMP 10216 10733 11001 - 11276 11888 118A7 - - _ 12143 - 124.47
9 MONTH 4,88166 5,10778 5,23548 5,36638 5,500 56 5,63806 5,77900 5,92346
SEMI -MONTH 2,43083 2,56389 2,61774 2,68319 2,75028 2,81903 2,88950 2,96173
ANNUAL 58,339 92 8_1,293 36 62,82576 64,396 56 66,00672 67,656 72 69,348 00 71,081 52
SEMI -MO DEF COMP 9723 10216 10471 1073 11001 11278 115 58 118A7
8 BKAT PRODUCTION ADMINISTRATOR MONTH 4,62742 4,86166 4,98322 5,10778 5,23548 5,36638 5,50056 5,63806
CITY CLERK SEMI -MONTH 2,31371 2,43083 2,49161 2,55389 2,61774 2,68319 2,75028 2,81903
CIVIL SERVICE OFFICER/HR ASSISTANT ANNUAL 55,52_9 04 58,339 92 59,79864 61,293_38 62,825_76 64,39656 66,006 72 _ 87,656 72
HR ANALYST SEMI -MO DEF COMP 92 "1 9723 9968 10216 104.71 10733 11001 11278
7 CDBG PROGRAM SPECIALIST MONTH 4,404 42 4 627 42 4,74308 4 861 66 4 983 22 5,10778 5,23548 5,36638
PROSECUTOR I SEMI -MONTH 2,202 21 2,31371 2,37164 2,43083 2,49161 2,55389 2,61774 2,68319
ANNUAL 52,953 04 55,52904 5_8,918 96 58,339_92 59,79864 61,293 36 62,828 76 64,396 56
8EMI-MO DEF COMP 8809 9265 94 - 97 - 23 9988 10216 104.71 10733
6 MONTH 4,192 18 4 404 42 451454 4,62742 4,74308 4,86166 498322 5,10778
SEMI -MONTH 2,09609 2,202 21 2,25727 2,31371 2,37154 2.43083 2,49161 2,55389
ANNU _ 80,306 16 52,85_3 04 5 55,829 04 88,91696 58,339 92 89,798 64 61,293 36
SEMI -MO DEF COMP 8384 8809 9029 9255 9488 9723 9988 10216
5 LEGAL ASSISTANT II MONTH 3,99018 4,192 18 4,29702 4,40442 4,51454 4,62742 4,74308 4,88166
SEMI -MONTH 1,99509 2,09809 2.14851 2,202 21 226727 2,313 71 2,37154 2,43083
ANNUAL 47,88216 50,3 5 52,85304 54,174A8 55,52904 88,91696 56,339 92
SEMI -W DEF COMP 7980 8384 8594 8809 9029 9256 9486 9723
4 LEGAL ASSISTANT I MONTH 3,79790 3,99018 4,08994 4,192 18 4,29702 4,40442 4,51454 4,62742
SEMI -MONTH 1,89895 1,99509 2,04497 2.09809 2,14851 2,202 21 2,25727 2,31371
ANNUAL _ 48,574 80 47,88218 49,079 28 50,30616 51,564 24 52,853 04 54,174 48 55,829 04
SEMI -MO DEF COMP 7596 79801 81801 63 841 85 54 8809 90291 92 55
11/14/2012
age
D
O
— - -
Water, Wastewater and
Stormwater Utilities Rate Study
Joint City Council/
Utility Advisory Committee
Workshop
November 14, 2012
Presented ese ed by
Angie Sanchez Virnoche, Principal /Project Manager
Sergey Tarasov, Project Consultant °
4 ICS GROUP
Overview
Kickoff Meeting May 23
Utility Advisory Committee meeting Sept. 11
Utility Advisory Committee meeting Oct. 19
Council workshop October 24
- Additional Information requested at meeting
- Addressed previously or on handout
Tonight's discussion
- Rate design alternatives
O FCS GROUP Page 2
1
11/14/2012
� n
Residential Bi- Monthly Bill Impact
Summary
. EM I M I -°
Base Case $ 17 34 $ 1907 $ 20601 $ 2225 $ 2347 $ 2476 $ 2551
Sl - 100% Debt Shaped 1734 19 07 2041 21 84 2293 24 OS 24 80
MgK g2NZEft jamn. 7SM Mo s'
Base Case 1 $100 23 $100 23 $103 74 $107 37 $111 13 $114 46 $117 89
Sl - 100% Debt Shaped 100 23 100231 101 73 103261 1048 10638 1 10798
17 °� EM M8 91F Base Case $ 3752 $ 41 12 $ 4507 $ 4940 $ 5335 $ 5762 $ 61 65
Sl -100% Debt Shaped 3752 1 40 52 43 76 47 26 4998 528, 55 90
Notes
•Stormwater rates are per ISU
-Wastewater Residential bi- monthly bill assumes 9 HCF of billed flow (4 5 HCF monthly)
*No Increase to wastewater rates in 2013
*Water Residential monthly bill assumes a 5/8" meter with 12 HCF of water (6 HCF monthly)
> FCS GROUP Page 3
Total Residential Bill Impact
Summary
M
Base Case 1 $15509 1 $160431 $16941 1 $179011 $187 95 1 $196 8 205 0
4 $5
S1 - 100% Debt Shaped 1 55 09 1 159831 16591 1 172361 1777 1833 188 67
Base Case $ 1 $ 534 $ 898 $ 961 1 $ 893 $ 8 89 $ 821
S1 - 100% Debt Shaped 4 74 608 6 46 536 5 59 536
%M affl .gaftamm ftwx1l am I EDO I G4°17K3 fit" 8 °!M MD
Base Case $ 1 $ 267 $ 449 1 $ 4 80 1 $ 4 47 1 $ 4 45 $ 410
S1 - 100% Debt Shaped 237 304 323 268 280 268
t> FCS GROUP Page 4
2
11/14/2012
RATE DESIGN
.,> FCS GROUP Page 5
Rate Design Objectives & Key Factors
• Collects the required level of revenue
• Reflect policy level decisions related to
affordability, stability and administration
• Proposed Storm and Wastewater rates:
- No rate structure changes at this time
- Increases applied equally to each rate component
(fixed and /or variable charges)
• Proposed Water rates:
- Recalibrate blocks to match City specific usage patterns
- Two and three block rate structure options
•> FCS GROUP Page 6
3
c
11/14/2012
Stormwater Rate Design (Base Case)
Residential (per account) $ 1734 $ 1907
Low Income Senior /Disabled (per account) 1058 11 64
Duplex (2 Meters - per account) 874 961
Commercial (per ISU) 1734 1907
Public School Districts (per account) 1734 1907
Notes
• ISU = impervious surface unit equivalent to 2 500 square feet of impervious surface
area
• Additional CSO charges apply to Residential and Commercial customers based on
downspout connection
• Water quality and quantity credits are available for Non Residential customer
• Additional penalties may apply to Non Residential accounts without onsite detention
hFCS GROUP Page 7
Stormwater Bill Comparison
Residential Bi- Monthly Stormwater Bill
$3000
$2500
m $2000
$1500
$1000
m $500
$-
`oo- � o pa S a �oQ �Oti'' ¢�ey �z °� �p o oa a�¢A raga
� Q �i o " o`�Po ot Q o ° � dk �e CP
q q
> FCS GROUP g
4
11/14/2012
Wastewater Rate Design (Base Case)
Single Family (per account) OMMD M. $ 6252 $ 6252 No rate increase in
Low Income (per account) 3878 3878 2013
Multi Family (includes duplex per unit( 4952 4952
Commercial I (per account) 9242 9242
Commercial II (per account) 9402 9402
Commercial III (per account) 93 10 93 10
Single Family •. $ 4 19 $ 4 19 Increasing the
Low Income Senior /Disabled Outside multiplier to
0- 10 /bi- monthly - - 1 5 would generate
Over 10 bi- monthly 4 19 4 19 an additional
Multi - Family 4 19 4 19 $254,000 in 2013
Commercial 432 432
Commercial 11 686 686
Commercial III 553 553
Notes Outside city multiplier of 1 15 times the Inside
city charges
O FCS GROUP Page 9
Wastewater Bill Comparison
Residential Bi- Monthly Wastewater Bill
(900 cf or 9 HCF)
$180
$160
= $140
$120
t $100
o $80 —
$60
m
$ao -
$
20 IHH'HH
S-
S�oco��ac �o�PCy'o�Q oJC QoJ���ra�ooO\a�Q 0c�oo J�� eS S °JCa te O �� ac �� o Q v �
Notes one cubic foot (cf) = 7 48 gallons, 100 cf or 1 hcf or ccf = 748 gallons
FCS CROUP 10
5
v
11/14/2012
Water Rate Design (Base Case)
1
5/9 $ 2276 $ 2494 Meter charges are the some
1 2602 2852
1 5 3698 4053 for all classes
7 49 68 5445
3 9424 10329
4 175 16 191 98
6 62278 68257
8
2 274 84 249322 2013 rates maintain current
10' 8 113 32 889220
17 30 500 66 33 428 72 structures with equal increases
PSNS Contract Rafe 44 535 88 48 811 321 to each rate component
Residential
BT 0-20 HCF $ 1 23 $ 1 35
B2 Over 20 HCF 1 39 1 52
Low Income Senior /Disabled
B1 0.10 HCF
B2 11 20 HCF 1 23 1 35
B2 Over 20 HCF 139 152 Notes
Non Residential 134 147 • Outside City multiplier of 1 5 times the
City Parks /Recreation Dept Irrigation 0 67 0 73 Inside charges
Gold Mountain Golf Course Complex Irr 090 099
PSNS Contract Rate 1 431 156 • Additional rates available for fire
t) FCS GROUP Page 11
�
srSi� �
Residential Commodity Charge
Alternatives
• Option 1: 3 - block structure
— Block 1 average winter usage (10 ccf indoor use)
— Block 2 2 times summer usage (28 ccf)
— Block 3 excess usage ( >28 CC F)
• Option 2: 2 - block structure (existing)
— Adjust blocks to existing trends
• Block 1 average annual usage (12 ccf)
• Block 2 excess usage ( >12 ccf)
> FCS GROUP Page 12
6
11/14/2012
Residential Usage Trends (Bi- Monthly)
Residential Bi- Monthly Bills
Average Use 12 HCF
7 000
6000 Winter Use 10 HCF
5000 — Summer Use 14 HCF
t 4 000
_I
g 3000 - --- - - ---- - - _-
i
m
2000
1000
HCF
Option 1 Opflon 2
BI- Monthly Blocks 900.0 . o o • o
10 28 28+ 12 12+
Distnbut ion ofBills 63267. 2844% 831% 1000D% 7029 2971% 1000017
Distribution of Volume 551876 39 16% 5667. 100 OD% 6533% 346 1000076
Distnbutlon of Usage 682 897 484 632 70 076 1 237 605 808 541 429 064 1 237 605
> FCS GROUP Page 13
Residential Current Structure
Across the Board Adjustment
o
B1 (0-20) $ 1 35
B2 20 1 + 1 52
7 T 6�aD � @
4 $ 2768 $ 3034 $ 266 $ 1 33
6 3014 3303 289 1 45
8 3260 3573 313 1 56
10 3506 3843 337 1 68
12 3752 41 12 360 1 80
14 3998 4382 384 1 92
20 4736 51 91 455 227
25 5431 5952 521 261
50 8906, 9761 1 855, 427
$> FCS GROUP 14
7
11/14/2012
Residential Option 1: 3 -Block Structure
oa - o o-
rxe G09P
BI (0 -10) $ 1 30
B2 (10 1 -28) 1 49
B3 (28 1 +) 1 87
o e . U @
4 $ 2768 $ 3016 $ 248 $ 1 24
6 30 14 3276 262 1 31
8 3260 3537 277 1 38
10 3506 3797 291 1 46
12 3752 4096 344 1 72
14 3998 4394 396 1 98
20 4736 5289 553 277
25 5431 6035 604 302
50 1 89061 10599 16931 846
`) FCS GROUP Page 15
Residential Option 2: 2 -Block Structure
ffo
B1 (0 -12) $ 1 30
B2 (12 1 +) 1 60
E°7 e g 2
4 $ 2768 $ 3014 $ 246 $ 1 23
6 3014 3274 260 1 30
8 3260 3534 274 1 37
10 3506 3794 288 1 44
12 3752 4054 302 1 51
14 3998 4374 376 1 88
20 4736 5334 598 299
25 5431 61 33 702 351
50 8906 10130 1224 6 12
Q> FCS GROUP Page 16
8
11/14/2012
Y
Water Bill Comparison
Residential Bi- Monthly Water Bill
(1200 CF or 12 HCF)
$9000
$8000
$7000
k $6000
r
$5000
c
$4000
$30 00
$20 00
$1000 IHHH H�HH H
a� B OO c ,4 �o & Q "¢ a� c� �� o
P oo ° � � Q ti r o�� O�� Q a te° O 0 3 � 'L� � L s a �
o a
a`' °JCa ¢F¢�oF¢�` °cam e e �
¢
0
Notes one cubic foot (cf) = 7 48 gallons, 100 cf or 1 hcf or ccf = 748 gallons
> FCS GROUP 17
Non - Residential - Current Structure
Across the Board Adjustment
On tfift &@am Q�) galam ME"@
58 10374 11370 $ 996 $ 498
Commercial (1 ") 115 18012 19741 1729 865
230 33422 36631 3209 1604
225 33848 37097 3249 1625
Multi Family (1 5') 450 63998 701 42 61 44 3072
900 1,24298 1,36231 11933 5966
255 391 38 42895 3757 1879
Irrigation (2 ") 510 73308 80346 7038 35 19
1020 1,41648 1,55246 13598 6799
FCs GROUP 18
9
11/14/2012 ,
ids
Combined Utility Bi- Monthly
Bill Comparison
Edmonds
Lynnwood
Puyallup
Lacey
Bremerton Current
i
PortOrchard
Bremerton 2013 2 Block
Bremerton 2013 3 Block
O Water
Bremerton 2013 ATB O Wastewater
Longview I O Storm
I
Olympia
Poulsbo
Gig Harbor
Bainbridge
Port Angeles
Snohomish
$ $25 $50 $75 $100 $125 $150 $175 $200 $225 $250 $275
A +F GROUP 19
Next Steps
• Council direction
- Overall rate increase
• Base case or shaped debt2
- Rate design option for water
• Existing rate structure
• 3 Block commodity charge
• Revised 2 block commodity charge
• Incorporate changes and begin public
outreach
• Next meeting?
Q+0 GROUP Poge20
10
r
City of Bremerton
Utilities Rate Study
Quest a nd Responses from Council Workshop — October 24, 2012
1. What entities did not respond to the survey?
Puyallup and Walla Walla Walla Walla has responded since the last Council Meeting and is
included in the updated slide deck
2. Provide names of comparable WA utilities on slide 7 Snapshot of local participants
2 Marysville, 3 Everett, 4 Lacey, 5 Kennewick 6 Bellingham
7 Yakima 8 Walla Walla (added in new slide deck)
3. What is the cost of different types of treatment?
Treatment operating costs are presented in terms of least amount of O &M to highest 0 &M The
costs for individual utilities may vary based upon the elevation of the source and required pumping
into their distribution system Capital costs would also proceed in this order as well, but capital
costs are also site specific
i Disinfection only (groundwater systems)
ii UV plus disinfection for residual maintenance
iii Direct Filtration (higher cost due to backwashing pumping and air compressor requirements),
may also require additional chemical addition to enhance filtration, and solids disposal for
backwash solids
iv Membrane or Conventional treatment (flocculation /sedimentation plus filtration)
4. Number of employees Water /Wastewater?
Water 36
Wastewater 26
5. What is the number of additional staff needed for Watershed?
4 Employees manage the watershed and other utility lands, also includes biosolids management and
other non - watershed responsibilities
6. What is the cause of the reduction in O &M Costs from 2007?
Information requested in 2012 was for an average of 5 years while 2007 was based on 2006 specific
data In addition, 2012 data for the water system did not include forestry associated O &M to compare
more closely with other WA entities Also in 2006 we did about $140,000 of reservoir coatings but did
not do any of this work in 2011 or 2012 Coatings have been budgeted in Water 0 &M in the past but
from now on will be in the CIP
7. Update the 2012 regional survey information to include Bremerton's data from 2007
See updated slides — handout
City of Bremerton
Utilities Rate Study
Questions from Council Workshop — October 24, 2012
S. Increase the scale for WA specific survey
See updated presentation for additional figure showing WA information specifically
9. What is the average age of the system?
Range of pipe from pre -1950s to current day,
i Greater than 50% is at least 1950s or older
10. What was the cause for breaks /failures? Do we know?
Primarily mechanical failures points, etc Most of our water main breaks occur on the older cast iron
pipe
11 What is the percent of the bill that represents taxes?
Refer to information provided by Becky Hasart on taxes for other WA cities- email to City Council
November 8
12 Approximately what cost is associated with CSO?
For an average bill of 4 50 hcf per month of billed sewer the CSO portion would be around $16 25
13 Provide information related to conservation programs and impacts.
Conservation impacts are due to a number of factors such as weather, economy, demographic
changes (declining household size) and conservation initiatives such as building code changes,
improved — technology/ efficiency, incentivized pricing, education programs and the 1992 Energy
Policy Act that required efficient water fixtures
450
400 -
T
m
350
d
300 - - - -
o �
8 250 - -
c o 200 -
P�J g 150 - -
m
100 _ _ _
Q
50
0
1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007
Year of Home Construction
The Water Use Efficiency rule requires that all water systems evaluate their water use and implement
a plan for efficiency The level of the program depends upon the current state of the system (metered
accounts and water loss being the high focus areas)
See attached comparison of Conservation Programs as described in the recent respective Water
System Plans for each water system Seven categories are shown that conservation programs address,
Page 3
J
City of Bremerton
Utilities Rate Study
Questions from Council Workshop — October 24, 2012
and the reported water use reduction is also shown From recent rate studies completed in 2010 -2012
utilities around the region (Oregon, Washington, Idaho) are experiencing reduction in consumption of
4 0% to 6 0% per year (annual average)
14 Provide the list of annual escalation factors used in rate study.
ct32GM M EM 00 06 ow M3
General Cost Inflation 223% 223% 223% 2237o 2 23% 223%
Construction Cost Inflation 5 OD% 5005. 500% 5 00% 5007o 5009
Labor Cost Inflation 150% 3 00% 3007o 300% 300% 300%
Benefit Cost Inflation 1000% 1000% 1000% 1000% 1000% 1000%
Investment Interest 075% 075% 100% 100% 1 00 100%
Storm Growth 081% 081% 081% 081% 081% 081% Based on In -City population growth
Wastewater Growth 081% 081% 081% 081% 081% 081% Based on In City population growth
Water Weighted Average Revenue Growth -0109; -0097. -009% 1 -010% -006% 1 027%
Accounts Total System 099% 100% 100% 100% 101% 1 00
Accounts In City Only 081% 081% 081% 081% 081% 081%
Accounts City System 1 04 104% 104% 104% 104% 1 055o
Demand SF -040% -0 40% -040% -041% -041% -041% Used in conjunction with customer
Demand MF -020% -0209 -020 -045% 00576 -020% statistics to project the Water
Demand Comm -020% -020% -020% -0 20% -0 20% -020% Weighted Average Revenue Growth
Demand Irr -020% -020% -020% -0 20% -020% -0 20%
Demand PSNS -338% 3 50% 3 63% 377% 3 92% -087%
No Escalation 0005. 0 OD% 1 000% 1 0 Of . 0 00% 1 0 00%
15 What are the annual percentage rate increases being evaluated?
Base Case 000% 10007o 8 00% 800% 55076 550% 300% 470976
S1 - 100% Debt Shaped 0 00 1000% 7 00% 700% 5007o 5 00% 300% 4301%
W @M== r rJ f fl 9�D e l
Base Case 0 00% 000% 3 50% 3507o 350% 3 00% 300% 17 62%
S1 - 100% Debt Shaped 000% 000 1 50% 1 50% 150% 1 50% 150% 77376
Base Case 000% 96 0% 9607o 960% 800% 8 00% 700% 1431%
S1 - 100% Debt Shaped 000% 800% 800% 800% 575% 575% 575% 489776
16 Consider the idea of increasing wastewater rates for 2013 instead of no increase
f i• Mu
Base Case 0 00 %• 90@ 2 60% 2 60% 2 60% 260% 26070 260% !6787.0' 5%
S2 - 100% Debt Shaped 000 1 10% 1 10% 1 10% i 10% 1 10% 1 10% C
go@ I MG I M@ I i• i"
Base Case $ 100 23 $ 102 84 1 $ 105 51 $ 108 25 $ 111 07 113 96 $ 116 92
Sl - 100% Debt Shaped 1 00 23 101331 10245 10357 10471 10587 107 03
Base Case $ - $ 261 1 $ 267 $ 274 $ 281 $ 289 $ 296
Sl - 100% Debt Shaped 1 10 1 11 1 13 1 14 1 15 1 16
17 Provide capital improvement plan
The CIP in the rate study focused on initial 6 years (see detail attached) Study will be updated to show
rolling 6 year capital improvement plan The City has also provided a handout comparing capital
projects in the budget to what was used in the rate study
Page 4
City of Bremerton
Utilities Rate Study
Questions from Council Workshop — October 24, 2012
18 Are annexations included in CIP?
Annexations are not included in CIP until such time that the annexations occur The appropriate
funding mechanism will be evaluated at that time
19 Is SKIA included in the capital Plan?
Any projects related to SKIA in the 6 year capital plan used in the rate study are assumed to be 100%
developer donated meaning there is no rate impact
20 How many customers are using the City's low income rate now?
The information provided from the billing system indicates
414 for Water,
426 for Sewer, and
364 for Storm
Page 5
City of Bremerton
Utilities Rate Study
Questions from Council Workshop — October 24, 2012
Stormwater 6 -Year CIP detail
maa
Brentwood Dr & Oyster Bay Culvert $ 250 000 $ 250,000
City Culverts 63 000 50 000 50 000 50 000 50 000 50 000 313,000
Collection Systems 50 000 50 000 50 000 50 000 50 000 50 000 300,000
Storm Drainage Replacement Program 120 000 120 000 120 000 120 000 120 000 120 000 720,000
Eagle Ave Storm Drain 75 000 500 000 575,000
Eastpark Stormwater Outfall 50 000 800 000 850 000
Kitsap Way Supplemental Culvert 75 000 450 000 525,000
5th St - Chester to Veneta (with Kiwaros Park) 10 000 10,000
Anderson Cove 450 000 10 000 460 000
Monette Business Area 10 000 10,000
11 th St PI and Washington Outfoll 50 000 150 000 200,000
Marine Drive and Kelley Road storm system 50 000 250 000 300 000
Price Road conveyance replacement 100000 100,000
W estpark Oyster Bay Outfali at OB -1 150 000 800 000 950 000
Stormwater Management PlanU date 30000 80000 110,000
Total CIP $ 783,000 $1,335,000 $1,595,000 $1,020 000 $ 470,000 $ 470,000 $5 673 000
External Funding Grants /CIAC 596 000 450 000 - - 1 046 000
Net CIP $ 187,000 S 885,000 $1595000 1 $1,020,000 $ 470,000 1 $ 470000 I $4,627,000
Growth CIP 328 250 7475 710 000 1 462 500 287 500 37 500 1 2,573,250
R&R CIP 454 750 5875%01 885 000 557 500 182500 '432500 3,099,750
Page 6
_ r
City of Bremerton
Utilities Rate Study
Questions from Council Workshop — October 24, 2012
Wastewater 6 -Year CIP detail
@3:=GW=( am MG mo M8 r r
Beach main and Critical Force main Cleaning $ 75 000 $ 200 000 $ 200 000 $ 20D 000 $ 675 000
Beach Main Replacement from ESTP to 16 -inch Siphon 1 250 000 1 250 000
WA Ave Sewer Replacement 250 000 2 500 000 2 750 000
Sheldon Blvd Sewer Replacement & CE3 Upgrade 125 000 1 000 000 1 125 000
Oyster Bay Beach Sewer 250 000 1 ODD 000 1 250 000
Digester Heat Exchanger #1 & #2 Replacement 62 000 62 000
Grout Annular Space of SW Bremerton FM 200 ODD 200 000
Improvement Between Schley and Fr Street 50 000 50 000
Improvement on Homer Jones 50000 50,000
Metal Storage Warehouse (40x80) 50000 50000
Miscellaneous Equipment 20 000 20 000 20 000 20 000 20 000 20 000 120 000
Primary Clarifier #I & 2 Dnve Replacement 70 000 70 000
Secondary Clarifier #1 & 2 Dnve Replacement 80 000 80 000
Substandard Main Replacement Program 350 000 350 000 350 ODO 350 ODO 350 000 350 000 2 100 000
Wastewater Reuse 250 000 250 000
W WTP and Pump Station Improvement Program 650 000 700 ODD 700 ODO 700 000 700 000 700 000 4 150 000
Westside WWTP Outfoll 150000 2500000 2650000
ESTPOutfall 100000 450000 550000
East & West Brem UGA Sewerage ULID Development 50 ODO 50 000
East & West Brem UGA Sewerage ULID Dgn & Const 2 000 000 2 000 ODD 4 000 000
Tracyton Blvd Cleaning Access and Capacity Analysis 500 ODD 500 000
SKIA Sewer Design & Construction ULID Dgn & Const 725 000 4 750 000 5 475 000
Replace Surge Tank at W B -6 125 000 125 000
Replace or rehabilitate 10 -inch SS under Secondary Clarifier 150 ODO 500 000 650 000
CIPP Line existing 54 -inch SD under Secondary Clarifier 250 000 250 000
Pacific Ave 6th to 11th SS Rehabilitation 550000 550 000
Cl PP repair of failing Sewers 75 000 525 000 600 000
Primary Effluent Pumps - drive replacement 1 2500001 1 1 1 1 1 250 000
r r ma r r r
Primary Effluent Line Rehabilitation 50 ODO 400 000 450 000
Replace Drives on RAS Pumps 125000 125 000
Emergency Generator Installation at EB3 50 OOD 50 000
Emergency Generator Installation at OB5 &6 125 000 125 000
Recoat Aluminum Covers on the Primary Clarifiers and Biofifier 25 OOD 250 ODO 275 000
Saltwater Infillration Elimination 75 000 75 000
Storage Warehouse at W WTP 450 ODO 450 000
Cherry Ave SS 25 000 25 000
Flex Net 750 ODO 750 000 1 500 000
Phinney Bay & Ostrich Bay SS Extenstion 75 000 1 500 ODO 1 575 000
Replace Surge Tank at CE -1 300 000 300 000
BiofiBer Upgrade 1 200 000 1 200 000
Abandon beach sewer north of Manette Bridge 200 000 2 OOD 000 2 200 000
Address infrastructure downstream on KLl 300 000 300 000
Replace Penthouse HVAC for Bldg 400 25000 25 000
Replace KL2 Engine Generator 85 ODO 85,000
Replace PE Pump Suction and Discharge Valves 400000 400000
Replace RAS Pumps 150 000 150 000
Replace CW2 pumps 200 000 200 000
Upgrade SCADA 150 000 150 000
Identity nt source removal from beach lines 150 000 150 000
Total CIP 5 555 000 S 5 977 000 S 5 125 000 S 8 045 000 10 970 000 4 020 000 39 692 000
External Funding ULID /CIAC 150 000 200 OOD 75 000 1 550 000 6 750 000 20000001 10 725 000
Net CIP 5,405000 5,777000 5050,000 6495,000 4 220 000 3 2,020,000 28 967 000
Growth CIP 745 000 1 630 000 1 217 500 4 317 500 1 8 542 500 3 030 000 19,482,500
R &R CIP 4 810 000 4 347 000 3 907 500 3 727 500 2 427 500 990 000 20 209 500
Page 7
f
City of Bremerton
Utilities Rate Study
Questions from Council Workshop — October 24, 2012
Water 6 -Year CIP detail
Substandard Water Main Replacement $ 200 000 $ 700 000 $ 200 000 $ 200 000 $ 200 000 $ 700 000 $ 2 200 000
Distribution Main Improvements 100 000 300 000 300 000 300 000 300 000 300 000 1 600 000
Machinery/Equipment - Water Resources 125 000 125 000 125 000 125 000 125 000 125 000 750 000
Machinery/Equipment - Utility Operations Mgr 20 000 20 000 20 000 20 000 20 000 20 000 120 000
Machinery/Equipment - Forestry 20 000 20 000 20 000 20 000 20 000 20 000 120 000
Taps 70 000 70 000 70 000 70 000 70 000 70 000 420 000
Meter Replacement 150 000 150 000 150 000 150 000 150 000 150 000 900 000
Meter Replacement Large 100 000 100 000 100 000 100 000 100 000 100 000 600 000
Fire Hydrants 20 000 20 000 20 000 20 000 20 000 20 000 120 000
Reservoir Coatings 230 000 110 000 240 000 240 000 240 000 240 000 1 300 000
Forestry Road Maintenance and Abandonment 20 000 20 000 20 000 20 000 80 000
Warren Avenue Bridge Main Seismic Upgrade Main Rep 1 700 000 1 700 000
Emergency Source Upgrade 100 000 100 000
Upgrade SCADA 100 000 100 000 50 000 250 000
Watershed Land Purchase 150000 150000
Generator /Auto Transfer Switch Oyster Bay 100 000 100 000
Oyster Bay Public Works Consolidation 250 000 250 000
R23 TM /DM Corrosion Correction 50 000 50 000
Pacific Avenue WM Replacement - 6th to 11th 500 000 500 000
Jarstad Park - Trail /Facilities Improvements 10 000 10 000
Upgrade Cook Rd Booster Station 40 000 40 000
Anderson Creek Fish Passage 150000 150000
Pressure Relief Valves 75 000 75 000 75 000 225 000
McKenna Falls Channel Modification 150000 150000
7e
Hardening of Casad Dam Overflow 200 000 200 000
Property Purchace for Re -Dnll Well 9 100 000 100 000
Anderson Creek Groundwater Rule CT Compliance 150 000 150 000
Casad Dam Electrical Upgrade 40 000 40 000
Upgrade Well Disinfection to Hypo 50 000 150 000 200 000
Caustic Tank Replacement at CCF 50 000 50 000 100 000
Decomsston Tenn Lakes Valve 50 000 50 000
Metering System Upgrade 1 000 000 1 000 000 1 000 000 3 000 000
24 -in TM at Res 4 Outlet 150 000 1 500 000 1 650 000
Redundancy 24 C Street from Oyster Bay to National 250000 250000
Well 22 Pump and Controls /PS 17 200 000 200 000
Sherman Heights Watermain Cure in Place 150 000 750 000 900 000
Resery oir 8 Drain 30 000 30 000
Marine Drive Watermain 1 000000 1 000000
Replace travelling screens at McKenna Falls Intake 100000 100000
Well 18 Pump and Motor 100000 100000
HVAC Upgrade at Forestry Office 12 000 12 000
Total CIP 4 017,000 $ 2 950 000 $ 2 590 000 $ 4 040 000 1 S 3 425 000 1$2945000 $19,967,000
External Funding ULID /CIAC 10000 10000
Net CIP 4,007,000 2,950,000 2 590,000 4,040 000 $3,425000 $2945000 1995 7 000
Growth CIP 602 500 757 500 917 500 1 117 500 842 500 642 500 1 4 880 000
R &R CIP 3 414 500 2 192 500 1 672 500 2 922 500 2 582 500 2 302 500 15,087 000
Page 8
Comparison of Conservation Programs as described in the recent respective Water System Plans for each water system
Category City
Marysville Walla
Bellingham Everett Kennewick Lacey Puyallup Yakima
Walla
56% metered, CIP projects
15,000 flat rate scheduled for
accounts, 2015 -2016 to
Meters Voluntary Metering provide meters ■ ■ ® ■ ■ ■
Program to help to unmetered
provide meters to customers
SF residences
In compliance, In compliance,
Data Collection except for flat rate except for flat ■ ■ ■ ■ ■ ■
customers (non- rate customers
metered) (non- metered)
Distribution System WUE Goal, > ■ ■ ■ ® Pending, > ® Adopted as a
Leakage (< 10%) 13% 16% WUE goal, 17%
Setting Goals ■ ■ ■ ■ ■ ■ ■ ■
Metering Program In compliance,
Efficiency Program is mayor portion of except for flat ■ ■ ® ■ ■ ■
WUE program rate customers
(non-metered)
Demand Forecast ■ ■ ■ ■ ■ ■ ■ ■
Performance Reports ■ ■ ■ ■ ■ ■ ■ ■
Projected Reduction in 12% 5 80% 1% 730% 120% 1770% 2%
Water Use No Information
r
11/13/2
November i4, zoiz
E�r�m�r��+r� �einchmarki�,g F�ep�rt
�itg� �+�+ur�cil �fl�c�rk 5essi+�n
t}
� r
Benchm�r�in Prc�c�ss
Identify Key CQm ►are fi�o Guidance on
Performance 1 4du t Improvements
Indicators
11/13/2012
Key Performance € a r
WATER WASTEWATER
• O &M Expenses 13 O &M Expenses
• Accounts per FTE o Accounts per FTE
System Integrity a System Integrity
• Water Loss ° Overflows
• Breaks
® System Complexity °Breaks
® System Complexity
•
Line Length
• MGDTreated ° Line Length
• Number of Tanks /Pump ° MGDTreated
Stations ° Number of Lift Stations
R Utility Bill Cost o Utility Bill Cost
Compare to In'dustry
3
z
0 2007 Qualserve Survey
o Sets baseline for comparison
Contains National and Regional data
Contains data by customer base
0 2012 Local Survey
• Sent survey to
e Bellingham, Everett, Kennewick, Lacey, Marysville, Puyallup,
Walla Walla, Yakima
• Most were very responsive and interested, z have not
been returned
• Will provide those who participated their comparison
4
2
11/13/2012
Guid o n Imp
o Identify areas where improvement has been
made
a Identify additional areas for future
improvement
o Set goals and plan to achieve those goals
5
Sample Parameter
Bremert n Data z o7
� ' Bremerton Data 2012
Western 1
• Q ualserve 2007
I
1
•
25% Perco ntile 1 ' 75% Percentile
M
Median 1
0 10 20 30 40 50 60 70 80
3
11/13/2012
Sna pshot of P articip a nts
Data Bremerton- 2 3 R r 4 ry 5 6 7 8
umberof Water Treatment Plants 2 1 1 4 2 1 - 1 4 ,
ater Treatment Process Unfiltered Membrane Direct Chlorination only Membrane Direct Direct Unfiltered
supply UV Filtration Filtration (groundwater) Filtration Filtration Filtration Supply Ozon
nnual Average of Water Delivered (MG1 70 53 Soo 605" ors 97 9 2 °r' I P+ 9 6 94
urface Water Supply y y y N y y y y
roundwate Supply f r' R y Y 1e x , N, 4; Y, y"' � N 'y y
umberof Wells 13 7 0 19 2 0 4 7
umber of Water Reservoir 17' < <E 8 -0 " 8 10 X1 114 p 5 _ �3
umber of Water Pump Stations 14 3 4 10 11 14 4 1
des of Water P,peline t �, 300 296'x' 450 " - 390," 379 396 k 300 '� _ n 179
umber of Water Customer Amounts 18 463 18 975 25 954 23 088 22 411 25 542 18 941 10 560
umberofwholesaleaccounts t s4 13 �: 127h 0 `�0 °_ %S '� ,0er z r 4w
nual Average of Wastewater Treated 5 49 19 N/A 55 122 11 53
MG)
umber of Wastewater Treatment l ' ry
adh0es j t - 2 1 2 ti ., N/A ,U
umber of Wastewater Lit Stations 39 15 37 49 16 27 10 6
dkE� Wtat 1pelme -172 4 , 210 - 345 , #r ' u a 206 266 314 350, 3 �. '� 143
r Customer 10 464 18 360 25 000 15 803 17 517 25 938 26 245 8400
W
Parameters Customer Accounts per Employee I
Bremerton Data
Number of
1 zoo, 1 2022
customer
accounts per CustomerAccounts Per Employee
employee has
increased 20%
from 2007
1
0 200 400 600 800 1000
# Accounts/# Employees
O
•• 4
S
4
` 11/13/2012
Water Staff �-
• .
; Bremerton Data
' number of ' 2007 ' 2022
facilities (wells, I
WTF, pump Staff per T NumberofFaallties -Water
station, dam,
tanks) as
i
compared to WA
peers
I
JResults in a low
i
number of staff
perfacility for 0 05 1 15 1
# Employees /Sum of WTPs, Wells, Pump Stations, Tanks
similar numbers
of staff `
9
Water - ° • - -
P arameters Em
Bremerton Data
:Slight increase
2007 ' 2032
in MGD of Treated
Water per MGDperEmployee
Employee from i
2007 r
uAdditional staff
is required for ,I
Bremerton to
manage the 0 01 02 03 04 05 06 07
MGD of Treated Water / #Employees
watershed and
supply faciIities
Zo
5
11/13/2012'
Water
Parameters O&M, • perAccount
Bremerton Data
JO &M Costs per ; 3007 ; 1011
Account have '
decreased from O &MperAmount
2007to 2012 i
JIncreased R &R i
may increase this
ratio
0 100 zoo 300 000 Soo
$ 0 &M Expense /p Accounts
11
Water
Parameters
Bremerton Data
❑Similar to O&M
3007 t 1011
per account, O &M
per MG water has O &M per MG of Water
been reduced II
i
JO &M per MG for
2012 is at the
median for WA
i
and national 2007
values 0 Soo 1000 1500 2000 2500 3000 3500
$O &M Expense /MG of Water Treated
fa- -e e •
11
6
11/13/2012
O&M Expense per •
P arame t ers Tr
Bremerton Data
��t 1 1
ld Br emerton has , 200, , 2022
numerous pump '
stations and tanks O &M per PS and Tank
due to topography I ,
of the area
i
I f.
JBremerton was
the lowest of the g
utilities surveyed
0 100 200 300 400 500 600 700 800 900
O &M Expense (51,000) /Sum of Number of Pump Stations Plus Tanks
13
W
W a t er Disrup
P
Bremerton Data
❑Disru tions are
P , 200 , 2022
unplanned outages
for greater than 4 Disruptions per 1000 Customers
hours
uDisruptions in WA
' ®■1■ II ■ti1�■ '
are well below
national values
I'Disruptions in
0 2 4 6 8 10 12 14
Bremerton were a Disruptions (Loss of Water) /1,000 Customers
reduced from 2007
to 2012 ,,; a •
14
7
11/13/2012
Water
Parameters • Breaks
i
Li At Data
4i At the higher ' 1007 ' 2012
end of the WA
surveyed entitles Distribution System integnty (Leaks and Breaks per 100miles)
but below the I
median nationally
I '
JAddltlonal R &R
Investment may
help to reduce the
leaks and breaks 0 10 20 30 40 so 60 70
4 of Breaks and Leaks /100 miles of Pipe
1 5
Parameters
• Percentage
Bremerton Data
jWAo are lo %for i 1
water loss and Bremerton is 1 2007 1 2011
still well below io % 1
UCalculation of water loss Water Loss
includes master meter
production information and
comrlation of billing records
and known water uses (fire i
fighting, flushing, etc)
DOlder meters "slow
down" overtime and I '
may not record all usage
L]System is an "older"
system and continues to
age
- Additional R &R Investment
may help to reduce this 0 2 4 6 B 10 12 14 16
percentage Percent of Water Loss/Total Water Treated
16
8
11/13/2012
Parameters Water
• • p.
Bremerton Data
®As an unfiltered, ; 2007 ; 2012
water supply,
actively track and Complaints per 1000 Customers
monitor customer
complaints r
feedback r
1
0 2 4 6 8 10 12 14 16
R Complaints /1,000 Customers
~ 1 7
Water
Parameters Single Family Residential Usage
Bremerton Data
USFR usage Is at ' '
usage 2007 I 2012
the low end of the r i
range
Single Family Residential Usage
❑i3 % decrease
in residential i
usage i
LlIndlcates that
I
Individual customer i
usage Is below
median for those
surveyed o so 100 160 200 260 300
Gallons per Day Usage per Single family Residiential Unit
❑Conservation
®Education
18
9
11/13/2012
Parameters Water
Average Residential Monthly Cost
Bremerton Data
uAt the low end of i
the range for all ( 2007 ( 2012
comparison
categories Avg Residential Monthly Cost
JNeed to consider
that water use is also
at the low end of
comparables and i
water use drives this
comparison
JSllght increase from
I i
2007 to 2022 but well o 10 20 30 40 50
below the 2 5% Average Residential htonthly Bill ($)
percentile for WA
comparisons
lg
Parameters Cost per 7500 gallons (10 ccf)
Bremerton Data
JDiffers from the
' i
Average Residential 2007 2012
Bill comparison to
more directly Cost per 75W gal (10 od)
evaluate the cost
per gallon
❑Lower end of the
range
❑Less spread in the I
ranges since this
metric normalizes 0 5 10 is 20 25 30 35 40
water use Monthly Cost ($) per 7,500 gallons 130 afl
information
20
10
11/13/2012
Wastewater Parameters
21
Wastewater ' • per s •
Parameters
Bremerton Data
ZiSlight increase ; 200 ; 2022
in number of '
accounts per Accounts per FTE-Sewer
employee since
2007
i
i
LIM the low end
of the WA range
and at the median
0 200 400 600 800 1000 1200 1400
of similar S Ze d
pAcwunts /# Employees
customer base
22
11
i
11/13/2012
Wastewater MGO Pr ocessed/Treated p.
P arameters oe
Bremerton Data
,- IMGDTreated per i 2007 1012
Employee has I i
Increased since 2007
MGD per Employee -Sewer
JHlgh end of
slmllarlyslzed
UM lnll-jq�
operation by
customer count
JBremerton also has i
successful CSO
program that Is not
reflected Inflow 0 01 02 03 04 05
(volume) comparison MGD Processed / # Employees
of staff levels
23
Wastew
St . - F
Par
Bremerton Data
LiHlgher number of ' '
' 300, ' 1012
facilities as , I
compared to WA
peers Staff per Total Numberof Faalities -Sewer
❑Compare this
slide with the
previous slide of
MGD Processed per
employee to see a
that Bremerton has I i
more facilities to
manage than peers 0 02 04 06 08 1 12 14 16
for similar volumes #Employees /Sum of Number of Treatment Plants and LdtStations
of water to treat
2 4
12
11/13/2012
Wastewater
Parameters i
O&M perAccount '
Bremerton Data '
J 'y 1
O& M per 1 2007 1 1012
account isjust '
above the median O &MperAaount -Sewer
for WA and has 1
been reduced 1
1
from 2007 I I
I '
0 100 200 300 400 500 600 700
v $ O &M Expense /Number of Accounts
25
Wastewater O&M per MG Treated
Parameters
Bremerton Data
❑SlmilartoO &M I 1
i 2007 1 2012
per account, O &M
per MG Treated O &MperMG -Sewer
has also been 1
reduced 1
i
1
$0 $1,000 $2000 $3000 $4000 $5000
$ O &M Expense /MG of Treated Wastewater
i
the
26
13
11/13/2012
Wastewater O&M per MG Treat . ed-WA Range
Parameters
Bremerton Data
La5(m(IartoO &M ° °
� zoo7 aou
per account, O &M
per MG Treated O &MperMG -Sewer
has also been °
reduced °
W�stern Data
°
i
$2000 $2200 $2400 $2600 $2800 $3000
$ O &M Expense /MG of Treated Wastewater
6 • •• se e.-
27
W
Parameters •
• p er F
Bremerton Data
iiH(gh number of 1 2007 1 2022
facilities as I '
compared to WA O&MperLS
peers, so less °
O &M per facility '
results °
°
°
°
°
0 100 200 300 400 Soo 600 700
0 &M Expense ($1,000) /Sum of Number of Lift Stations
28
14
11/13/2012
Wastewater
• P i pe line
P
Bremerton Data
JJust below the ; 3007 ; 3011
median of the
O &M costs per O &M per Mile of Pipeline -Sewer
miles of pipeline
in WA I '
I
I �
$0 $5000 $10000 $15000 $20000 $25 000 $30000 $35000 $40000
$O &M Expense /Miles of Pipe
29
Wastewater Breaks/Failures per loo miles
P
Bremert on Data
®Number of 1
1 100, ' 1011
breaks /failures '
has been reduced Collection System Integri (breaks/failures pe r IW miles)
since zoo?
o5till at the high
end forWA but in
a comparable
range nationally
0 5 10 15 20 25 30 35
Number of Breaks /loo miles of pipe
49
30
15
11/13/2012•
Wastewater
Average Residential Monthly Cost
Parameters
Bremerton Data
i Wastewater bill 1 2007 ' 2011
Includes CSO I '
charge, survey Avg Residential MonthlyCostSewer
participants did
not
JCSO charge
pushes residential
bill to the higher
end of bills 0 10 20 30 40 so 60 70
Average Residential Monthly Cost (S)
i
3 1
Water Parameters Summary
® Low number of staff per facility
o Increased number of accounts per employee
® Low O &M costs
c3 Low range of customer bills
• Minimal disruptions and customer complaints
• Slight increase in water loss
31
16
11/13/2012
Wastewater Parameters Summary
• Lower number of staff per facility
• O &M costs have been reduced in both O &M
per facility and O &M per account
• Lowest 0 &M cost per facility as compared to
WA peers
• Customer bills include CSO charge
33
Questions?
17
______________________________________________________________
CITY COUNCIL 345 6th Street, Suite 600, Bremerton, WA 98337 Phone (360) 473-5280
* * * A M E N D E D * * *
NOVEMBER 14, 2012
CITY COUNCIL STUDY SESSION & BUDGET WORKSHOP
4:00 PM in MAYOR’S CONFERENCE ROOM
(Please note earlier start-time and new location for this meeting only…)
The Study Session is open to the public but there will be no opportunities for input or participation; no
action is anticipated during the Study Session; and the content of these items is subject to change. If
approved by Council, the items will be placed on the December 5, 2012 Council Meeting Agenda:
A. NO PRESENTATION PLANNED - The following items are budgeted items or have been
reviewed by the appropriate Council Committee:
1. Contract Modification for long-term groundwater monitoring at former Chevron Property –
Tom Knuckey, City Engineer, Public Works & Utilities Department
2. Agreed Order with Department of Ecology for monitoring and reporting at former Chevron
Property – Tom Knuckey, City Engineer, Public Works & Utilities Department
3. Ordinance to repeal Chapter 2.43 of the Bremerton Municipal Code (BMC) regarding the
Gold Mountain Complex Board of Directors – Wyn Birkenthal, Parks & Recreation Director
B. FULL DISCUSSION ITEMS
4. 2012 United Way Campaign Briefing – Shannon Corin, City Clerk
5. Adopt Kitsap Regional Coordinating Council (KRCC) Interlocal Agreement 2012
Amendments – Mary McClure, KRCC Executive Director
6. Appointment of Public Works Administration Division Manager at a Step Higher than Rate 1
in Band 11 - Chal Martin, Public Works & Utilities Director (Action is anticipated…)
7. Utility Rate Study “Fee Structure & Classifications” – Becky Hasart, Financial Services
Director; FCS Group; and Utility Rate Study Advisory Committee
8. BUDGET WORKSHOP: Continued discussion on the City of Bremerton 2013 Proposed
Budget – Becky Hasart, Financial Services Director; and Caroline Tompson, Budget Analyst
C. GENERAL COUNCIL BUSINESS
D. ADJOURN STUDY SESSION
Americans with Disabilities Act accommodations provided upon request. Those requiring special accommodations
should contact the City Clerk’s Office at (360) 473-5323 by noon on the Monday preceding the Council meeting.
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Agreed Order with Ecology for
Long-Term Monitoring and Reporting at the
Former Chevron Property
Study Session Date: November 14, 2012
COUNCIL MEETING Date: December 5, 2012
Department: PW&U Engineering
Presenter: Tom Knuckey
Phone: 473-2376
SUMMARY: The City has completed remedial construction as required under Agreed Order DE-
07TCPHQ-5024 at the former Chevron property. Per the terms of the order, the City is committed to
on-going groundwater monitoring until contamination levels drop to MTCA A levels – for planning
purposes this is estimated to be achieved in 5-years. Ecology has requested the City execute a
second Agreed Order (DE-12TCPHQ-9509) which quantifies monitoring and reporting requirements.
The second Agreed Order makes the City eligible to expend grant funds for the first year of
monitoring. The requested action is approval of Agreed Order DE-12TCPHQ-9509.
ATTACHMENTS: 1. Council Summary; 2. Agreed Order.
FISCAL IMPACTS (Include Budgeted Amount): The 2012 budget is $80,000 and the 2013
requested budget is $30,000. Projected 2013 expenditures will exceed the budget; therefore, a mid-
year budget adjustment is anticipated.
STUDY SESSION AGENDA: ☒ No Discussion ☐ Full Presentation
STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve Agreed Order DE-12TCPHQ-9509 and authorize the Mayor to finalize and execute
the document with substantially the same terms and conditions as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/02/12
Former Chevron Property
Long-term Groundwater Monitoring Page 1 of 3
FORMER CHEVRON PROPERTY LONG-TERM MONITORING
COUNCIL SUMMARY
Background: In 2007, the City executed Agreed Order DE-07TCPHQ-5024 with Ecology
for cleanup of the former Chevron property. The cleanup construction was completed in
two phases; the initial phase was performed in 2009 and consisted of injection of a
chemical oxidizing reagent in the lower yard (north half of the site), and
excavation and removal of small contamination “hot spots” in the upper yard
(south half of the site.) The second phase was performed in 2011 and consisted
of injection of additional oxidizing reagent at hot spots remaining in the lower
yard. The chemical injection approach was selected since the mass excavation
alternative for the entire site was very expensive ($5.7M) and was only eligible
for a 75% grant, compared to the selected alternative ($1.1M) which was grant
funded at 90%.
Ongoing Work at the Property: The injected chemicals coupled with naturally
occurring bacteria will continue to reduce residual contamination at the site for
years. Remaining work is limited to groundwater monitoring and reporting to
track the reduction of contamination until MTCA A levels are reached – for
planning purposes, it is estimated this will be achieved in 5-years.
On-going groundwater monitoring was previously committed to in the initial
Agreed Order and associated Remedial Investigation and Feasibility Study.
Given completion of the “Interim Action” (the remediation construction), Ecology
has proposed we execute a second Agreed Order for the site – this order would
formalize the scope and schedule for on-going groundwater monitoring,
reporting, and outline institutional controls (use restrictions) for the site. The
second agreed order would also make the City eligible for grant funding under a
separate remedial action grant for the first year of monitoring and reporting at the
site.
Existing Contract with Parametrix: In January, 2011, the City executed a contract
with Parametrix for Professional Services, Field Services and Laboratory
services associated with completing the remedial work described above. At the
time of execution of this contract, follow-on long-term monitoring was anticipated;
however, the amount of monitoring could not be quantified and so it was not
included in the contract.
First Agenda Bill: Contract Modification with Parametrix, Inc for Long-term
Groundwater Monitoring and Reporting
The consultant scope of work is to develop required reports and perform long-
term groundwater monitoring until contamination levels drop to MTCA A levels.
For the contract, this is estimated to be achieved in 5-years. The consultant
scope includes the following:
First year (Dec 2012 – Dec 2013) – the consultant work includes work
plan preparation and 2 semiannual groundwater sampling events (January
Former Chevron Property
Long-term Groundwater Monitoring Page 2 of 3
and July – wet and dry events) and reports submitted to Ecology; total
cost is $60,000. Assuming approval of the Second Agreed Order, this
work would be eligible for grant funding at 90%.
Second through fourth years (2014 - 2016) – the consultant work includes
semiannual groundwater sampling events and reports; this work is not
grant eligible.
Fifth year (2017) – the consultant work includes 4 quarterly groundwater
sampling events and a final report; this work is not grant eligible.
The initial contract was for $123,786, the proposed modification is for $225,256
for a new contract total of $349,042.
Second Agenda Bill: Agreed Order with Ecology for Long-Term Monitoring
and Reporting at the Former Chevron Property
While the existing Agreed Order obligated the City to perform long term
monitoring, the actual monitoring was not quantified (number of wells to be
monitored, number of sampling events per year), and the type of institutional
controls to be put on the property was not quantified. Ecology has requested the
City execute a second Agreed Order on the property to formalize these issues.
The advantage to the City is that upon execution of the Agreed Order, the City
becomes eligible for an Ecology grant to reimburse 90% of the costs associated
with the first year of monitoring, reporting, and other activities associated with the
property.
Financial Summary:
Anticipated project costs are presented below – costs include both City labor and
reimbursement of Ecology for their labor which is not grant eligible:
2012 2013 2014 2015 2016 2017
Project Cost (1) 70,500 54,500
38,500
38,500 38,500 78,500
Consultant Fee (2) 15,900 (3) 48,000
32,000
32,000
32,000
72,000
Grant
Reimbursement
55,000 45,500
9-11 Committee
Donation
4,500
Net Expense 11,000 9,000
38,500 38,500 38,500 78,500
Notes:
(1) Project costs include an estimated $2,500 City and $4,000 Ecology costs per
annum from 2013 - 2017.
(2) The 2012 fee is from both the existing contract, and proposed Contract
Modification.
(3) Includes $6,900 in expenses from prior to amendment.
Former Chevron Property
Long-term Groundwater Monitoring Page 3 of 3
The expenditure forecast presented above is not consistent with the CIP and
budget request due to project delays resulting from delays in receiving the
Agreed Order from Ecology. A 2013 mid-year budget adjustment is anticipated
to account for the projected $24,500 shortfall in expenditure authority.
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Contract Modification No. 1 to
Former Chevron Property Remediation
Contract with Parametrix.
Study Session Date: November 14, 2012
COUNCIL MEETING Date: December 5, 2012
Department: PW&U, Engineering
Presenter: Tom Knuckey
Phone: 473-2376
SUMMARY: The City has completed remedial construction as required under Agreed Order DE-
07TCPHQ-5024 at the former Chevron property. The cleanup construction was completed in two
phases with injection of a chemical oxidizing agent being the primary removal method in the lower
yard. Per the terms of the order, the City is committed to on-going groundwater monitoring until
contamination levels drop to MTCA A levels – for planning purposes this is estimated to be achieved
in 5-years. The requested action is modification of the consultant contract to perform groundwater
monitoring and reporting to Ecology over a 5-year term.
ATTACHMENTS: 1. Council Summary; 2. Contract Modification.
FISCAL IMPACTS (Include Budgeted Amount): The 2012 budget is $80,000 and the 2013
requested budget is $30,000. Projected 2013 expenditures will exceed the budget; therefore, a mid-
year budget adjustment is anticipated.
STUDY SESSION AGENDA: ☒ No Discussion ☐ Full Presentation
STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve Contract Modification No. 1 to the Professional Services Agreement with
Parametrix, Inc., in the amount of $225,256 (including sales tax) and authorize the Mayor to finalize
and execute the document with substantially the same terms and conditions as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/02/12
Former Chevron Property
Long-term Groundwater Monitoring Page 1 of 3
FORMER CHEVRON PROPERTY LONG-TERM MONITORING
COUNCIL SUMMARY
Background: In 2007, the City executed Agreed Order DE-07TCPHQ-5024 with Ecology
for cleanup of the former Chevron property. The cleanup construction was completed in
two phases; the initial phase was performed in 2009 and consisted of injection of a
chemical oxidizing reagent in the lower yard (north half of the site), and
excavation and removal of small contamination “hot spots” in the upper yard
(south half of the site.) The second phase was performed in 2011 and consisted
of injection of additional oxidizing reagent at hot spots remaining in the lower
yard. The chemical injection approach was selected since the mass excavation
alternative for the entire site was very expensive ($5.7M) and was only eligible
for a 75% grant, compared to the selected alternative ($1.1M) which was grant
funded at 90%.
Ongoing Work at the Property: The injected chemicals coupled with naturally
occurring bacteria will continue to reduce residual contamination at the site for
years. Remaining work is limited to groundwater monitoring and reporting to
track the reduction of contamination until MTCA A levels are reached – for
planning purposes, it is estimated this will be achieved in 5-years.
On-going groundwater monitoring was previously committed to in the initial
Agreed Order and associated Remedial Investigation and Feasibility Study.
Given completion of the “Interim Action” (the remediation construction), Ecology
has proposed we execute a second Agreed Order for the site – this order would
formalize the scope and schedule for on-going groundwater monitoring,
reporting, and outline institutional controls (use restrictions) for the site. The
second agreed order would also make the City eligible for grant funding under a
separate remedial action grant for the first year of monitoring and reporting at the
site.
Existing Contract with Parametrix: In January, 2011, the City executed a contract
with Parametrix for Professional Services, Field Services and Laboratory
services associated with completing the remedial work described above. At the
time of execution of this contract, follow-on long-term monitoring was anticipated;
however, the amount of monitoring could not be quantified and so it was not
included in the contract.
First Agenda Bill: Contract Modification with Parametrix, Inc for Long-term
Groundwater Monitoring and Reporting
The consultant scope of work is to develop required reports and perform long-
term groundwater monitoring until contamination levels drop to MTCA A levels.
For the contract, this is estimated to be achieved in 5-years. The consultant
scope includes the following:
First year (Dec 2012 – Dec 2013) – the consultant work includes work
plan preparation and 2 semiannual groundwater sampling events (January
Former Chevron Property
Long-term Groundwater Monitoring Page 2 of 3
and July – wet and dry events) and reports submitted to Ecology; total
cost is $60,000. Assuming approval of the Second Agreed Order, this
work would be eligible for grant funding at 90%.
Second through fourth years (2014 - 2016) – the consultant work includes
semiannual groundwater sampling events and reports; this work is not
grant eligible.
Fifth year (2017) – the consultant work includes 4 quarterly groundwater
sampling events and a final report; this work is not grant eligible.
The initial contract was for $123,786, the proposed modification is for $225,256
for a new contract total of $349,042.
Second Agenda Bill: Agreed Order with Ecology for Long-Term Monitoring
and Reporting at the Former Chevron Property
While the existing Agreed Order obligated the City to perform long term
monitoring, the actual monitoring was not quantified (number of wells to be
monitored, number of sampling events per year), and the type of institutional
controls to be put on the property was not quantified. Ecology has requested the
City execute a second Agreed Order on the property to formalize these issues.
The advantage to the City is that upon execution of the Agreed Order, the City
becomes eligible for an Ecology grant to reimburse 90% of the costs associated
with the first year of monitoring, reporting, and other activities associated with the
property.
Financial Summary:
Anticipated project costs are presented below – costs include both City labor and
reimbursement of Ecology for their labor which is not grant eligible:
2012 2013 2014 2015 2016 2017
Project Cost (1) 70,500 54,500
38,500
38,500 38,500 78,500
Consultant Fee (2) 15,900 (3) 48,000
32,000
32,000
32,000
72,000
Grant
Reimbursement
55,000 45,500
9-11 Committee
Donation
4,500
Net Expense 11,000 9,000
38,500 38,500 38,500 78,500
Notes:
(1) Project costs include an estimated $2,500 City and $4,000 Ecology costs per
annum from 2013 - 2017.
(2) The 2012 fee is from both the existing contract, and proposed Contract
Modification.
(3) Includes $6,900 in expenses from prior to amendment.
Former Chevron Property
Long-term Groundwater Monitoring Page 3 of 3
The expenditure forecast presented above is not consistent with the CIP and
budget request due to project delays resulting from delays in receiving the
Agreed Order from Ecology. A 2013 mid-year budget adjustment is anticipated
to account for the projected $24,500 shortfall in expenditure authority.
CONTRACT MODIFICATION 1
Project Number:
CONTRACT MODIFICATION AGREEMENT NO. 1
BETWEEN THE CITY OF BREMERTON AND
PARAMETRIX
PROJECT Former Chevron Property Remediation
CONSULTANT Parametrix, Inc.
DATE December 5, 2012
THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE
FORMER CHEVRON PROPERTY REMEDIATION
AGREEMENT (the "Contract") entered into between the City of Bremerton and Parametrix
on January 27, 2011
All provisions in the Contract shall remain in full force and effect except as expressly modified by
this document.
For valuable consideration and by mutual consent of the parties, the modifications to the Contract
are as follows:
I.
Section I. Scope , is modified as follows: See Amended Scope of Work attached as
Exhibit A)
Section II. Term , is modified as follows:
The Consultant shall complete the work described in this Contract Modification Agreement by
December, 2017.
Section III. Compensation , is modified as follows:
The original contract amount was One Hundred Twenty Three Thousand Seven Hundred
Eighty-Six Dollars ($123,786.00). The City shall pay the Consultant for the additional work
described above, based on time and materials, an amount not to exceed Two Hundred Twenty
Five Thousand Two Hundred Fifty-Six Dollars ($225,256.00) for a total amended contract
amount of Three Hundred Forty Nine Thousand Forty-Two Dollars ($349,042.00),
including this Contract Modification.
II.
Consultant accepts all requirements of this Contract Modification by endorsing below.
Consultant further agrees that this Contract Modification constitutes full and final settlement
of all of the Consultant’s claims for contract time and for all costs of any kind, including
without limitation, costs of delays related to any work either covered or affected by this
Contract Modification, claims related to on-site or home office overhead, or lost profits. This
Contract Modification does not limit the City’s right to bring a claim for past performance.
CONTRACT MODIFICATION 2
Project Number:
The undersigned consultant approves the foregoing Contract Modification as to the changes,
if any, in the contract price specified for each item, including any and all supervision costs and
other miscellaneous costs relating to the change in work, and as to the extension of time
allowed, if any, for completion of the entire work due to said Contract Modification.
This document will become a supplement of the contract and all provisions will apply hereto.
It is understood that this Contract Modification shall be effective when approved by the City
of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a
contract modification that is binding on the parties of this contract. In addition, Consultant
warrants that it has or will inform the surety of this change, and shall take appropriate action
to modify any bonds required under the contract to address this change.
IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day
and year first written above.
City Engineer / Public Works Director approved to process
Initials and Date
CONSULTANT. THE CITY OF BREMERTON
By By Patty Lent
Its Its Mayor
DATE: DATE:
APPROVED AS TO FORM: ATTEST:
Bremerton City Attorney City Clerk
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
Dave Dinkuhn Tom Knuckey, PE
Senior Engineer City Engineer
Parametrix City of Bremerton Engineering Department
4660 Kitsap Way, Suite A 3027 Olympus Drive
Bremerton, WA 98312 Bremerton WA, 98312
360-377-0014 360-473-2376
R:\LEGAL\Contracts\FORMS\Contract Modification (2003).doc
City of Bremerton 233-1896-098
Scope of Work 1 October 2012
Former Chevron Property Remediation, Amendment No. 01
EXHIBIT A – SCOPE OF WORK
City of Bremerton
Professional Services Agreement for
Former Chevron Property Remediation
Amendment No. 01 - Long Term Monitoring
INTRODUCTION
This Scope of Work (SOW) describes Parametrix’s proposal for five years of Long-Term Monitoring
(LTM) at the Former Chevron Property. The work will be performed under Amendment No. 01 to our
existing Professional Services Agreement dated January 27, 2011. The tasks described here are part of
the selected cleanup action described in the Draft Cleanup Action Plan (DCAP) developed for the site in
coordination with the Washington State Department of Ecology (Ecology). The LTM activities include
preparation of work plans, installation and development of a new groundwater monitoring well, four years
of semi-annual groundwater sampling, and one year of quarterly groundwater sampling conducted during
the fifth year. Following each sampling effort, a summary technical memorandum will be prepared; a
final Summary Report will be prepared at the end of the five-year monitoring period that will summarize
the results of all monitoring events.
We anticipate that a portion of the work described here will be funded by a Remedial Action Grant from
Ecology. The grant funded work will include work plan preparation and long term monitoring for the
first year. The grant application is being developed concurrently with this SOW. Parametrix shall not
initiate work until the grant is approved by Ecology. If the grant is not approved, the City of Bremerton
(City) shall retain right to terminate any Professional Services Agreement executed based on this SOW.
TASK 1 – PROJECT MANAGEMENT AND ADMINISTRATION
Goal
To provide for overview and direction of task activities in a manner that allows for the delivery of the
project in accordance with the scope, schedule, and budget.
Approach
Specific work elements will include:
A combination of in-house reviews and monthly progress reports will be used to deliver elements
of work described in this Scope of Work.
Weekly calls or meetings with the City’s project manager to update progress.
Management of subcontractors.
Deliverables
City of Bremerton 233-1896-098
Scope of Work 2 October 2012
Former Chevron Property Remediation, Amendment No. 01
Parametrix anticipates the following work products for this task:
Routine correspondence, schedule and budget updates, and status reports on progress of work.
Assumptions
The task budget is based on the following assumptions:
Project management and administration tasks will be performed through the project period, which
will end on October 31, 2017.
Monthly project update calls will be attended by the project manager.
TASK 2 – WORK PLANS
Goal
Prepare project work plans as required by Ecology under the site’s Agreed Order.
Approach
The following activities will be performed:
The required work plans that will be prepared for the project include:
Long-Term Monitoring Sampling and Analysis Plan: Describes well installation
procedures, sampling methods, analytical program, and QA/QC procedures for long-term
monitoring.
Updated Public Participation and Health and Safety Plans: Updates to these existing
project plans will be prepared as appropriate.
Institutional Controls Plan: Describes procedures to be implemented to protect human
health and the environment at the site. Includes an Environmental Covenant to be
recorded with the property title.
Final Cleanup Action Plan: We will finalize the existing Draft Cleanup Action Plan
(DCAP). Following public comment, the three project plans listed above will be
incorporated into the DCAP and a Final Cleanup Action Plan will be prepared.
Deliverables
The following deliverables will be submitted under this task:
Draft and Final Work Plans as described above.
Assumptions
The task budget is based on the following assumptions:
City of Bremerton 233-1896-098
Scope of Work 3 October 2012
Former Chevron Property Remediation, Amendment No. 01
Sampling will be conducted in all eleven Lower Yard wells for all five years. The Sampling and
Analysis Plan will include a provision allowing the City to request a reduction in the number of
wells sampled and/or a reduction in the number of analyses performed. Such request would
require justification based on the results of the preceding long-term monitoring results.
Up to two 2-hour meetings will be held with the City and Ecology via telephone to discuss
approaches and comments to the draft work plans.
Draft work plans will be submitted electronically in PDF format. Two hardcopies of final plans
will be submitted to Ecology and one hardcopy will be submitted to the City. Final hardcopy
submittals will include a CD with electronic copies in PDF format.
TASK 3 – LTM FIELD WORK AND REPORTING
Goal
To complete the required LTM sampling and reporting in accordance with the Sampling and Analysis
Plan.
Approach
The following activities will be performed:
Installation and development of a new monitoring well (MW20R) downgradient of existing well
MW27 and cross gradient of MW09R. The purpose of the new well will be to assess the extent of
the contaminated groundwater plume in this area and will represent a conditional point of
compliance. Development will be accomplished by surging and over pumping.
Collection of four years of semi-annual rounds (eight field events) of groundwater samples from
eleven wells. Following the initial four-year monitoring period, one year of quarterly groundwater
samples (four field events) will be collected from the same eleven wells.
Additional survey effort to map the elevation of the new well.
Following each LTM sampling effort, the results will be presented in a technical memorandum
with supporting tables and figures as appropriate.
Deliverables
The following deliverables will be submitted under this task:
Technical memoranda following each monitoring event.
Assumptions
The task budget is based on the following assumptions:
Well installation and development can be accomplished by one field staff in two 8-hour days.
City of Bremerton 233-1896-098
Scope of Work 4 October 2012
Former Chevron Property Remediation, Amendment No. 01
Each sampling effort can be accomplished by one field staff in three 10-hour days.
Development and purge water from the wells will be disposed of at the City’s WWTP using a
City vactor truck.
The LTM sampling results memoranda will be prepared within six weeks of completion of each
groundwater monitoring event for City review and submittal to Ecology.
The draft results memoranda will be submitted electronically in PDF format to the City for
review. Two hardcopies of the final documents will be submitted to Ecology and one hardcopy
will be submitted to the City. Final hardcopy submittals will include a CD with an electronic copy
of the final documents in PDF format. Laboratory Data will be provided to Ecology in
Environmental Information Management (EIM) format.
TASK 4 – FIVE-YEAR SUMMARY MONITORING REPORT
Goal
To compile and report the results of the five-year monitoring program and verify that natural attenuation
continues to occur at the site or to demonstrate that cleanup levels have been met.
Approach
The following activities will be performed:
Preparation of a summary report describing the results of the first five years of the LTM program,
including supporting figures and tables and any proposed changes to the monitoring program.
Deliverables
The following deliverables will be submitted under this task:
Draft and Final Five-Year Summary Report
Assumptions
The task budget is based on the following assumptions:
One face-to-face 4-hour meeting will be held with Ecology and/or the City to discuss and finalize
the Five-Year Summary Report.
A single round of comments each from the City and Ecology will be required to finalize the Five-
Year Summary Report.
The Five-Year Summary Report will be submitted electronically in PDF format. Two hardcopies
of the final documents will be submitted to Ecology and one hardcopy will be submitted to the
City. Final hardcopy submittals will include a CD with an electronic copy of the final documents
in PDF format. Laboratory Data will be provided to Ecology in EIM format.
City of Bremerton 233-1896-098
Scope of Work 1 October 2012
Former Chevron Property Long-Term Monitoring
EXHIBIT B
Schedule
Work Element Completed By
Notice to Proceed December 17, 2012
Draft Work Plans December 31, 2012
Final Work Plans January 2013
1st Semi-Annual Groundwater Sampling Event January 2013
2nd Semi-Annual Groundwater Sampling Event July 2013
3rd Semi-Annual Groundwater Sampling Event January 2014
4th Semi-Annual Groundwater Sampling Event July 2014
5th Semi-Annual Groundwater Sampling Event January 2015
6th Semi-Annual Groundwater Sampling Event July 2015
7th Semi-Annual Groundwater Sampling Event January 2016
8th Semi-Annual Groundwater Sampling Event July 2016
1st Quarterly Groundwater Sampling Event October 2016
2nd Quarterly Groundwater Sampling Event January 2017
3rd Quarterly Groundwater Sampling Event April 2017
4th Quarterly Groundwater Sampling Event July 2017
Draft 5-Year Summary Monitoring Report August 2017
Final 5-Year Summary Monitoring Report September 2017
Project Close Out October 2017
City of Bremerton 233-1896-098
Scope of Work 1 October 2012
Former Chevron Property Long-Term Monitoring
EXHIBIT C
Budget
Task 1 Project Management and Administration ......................................................................... $9,296
Task 2 Work Plans .................................................................................................................... $18,692
Task 3 Long-Term Monitoring Activities ................................................................................ $186,656
Task 4 Five-Year Summary Monitoring Report ........................................................................ $10,612
TOTAL ....................................................................................................................... $225,256
NOTES:
The estimated fees shown above were determined on a cost plus multiplier basis; these fees shall not be
exceeded without prior written approval by the City. Personnel hourly rates shall be determined as
follows: Direct salary x 3.1 not to exceed $150.00. Subconsultants, sampling supplies, and equipment
rental shall be subject to a 5 percent markup. Total estimated costs reflect an anticipated 3 percent annual
escalation.
A breakdown of costs is provided in the attached budget spreadsheet.
Client: City of BremertonProject: Former Chevron Prop ‐ Long Term MonitoringBUDGET DETAILSr ConsultantSr EngineerHydrogeologist IIIBremerton Support ServiceCADD SupervisorPuyallup WordprocessingBremerton Survey CrewCorp Finance Project AccountantBurdened Rates: $150.00 $136.83 $92.97 $66.77 $97.34 $62.00 $167.40 $82.15Phase Task DescriptionLabor Dollars Labor Hours01 Project Management $8,771 68 8 303001 PM $8,771 68 8 303002 Work Plans $17,504 176 48 76 16 14 2201 Long Term Mon Plan $4,797 50 8 28 4 6 402 Update PPP & HASP $3,683 40 4 24 4 4 403 Institutional Control Plans $4,283 34 28 2 2 204 Final Cleanup Action Plan $4,741 52 8 24 6 2 1203 LTM Activities $93,328 892 62 676 76 36 36 601 Install 1 New Well & Develop $4,148 40 2 28 4 602 LTM Groundwater Sampling $89,180 852 60 648 72 36 3604 Five Year LTM Report $9,868 88 8 12 44 8 8 801 Report $9,868 88 8 12 44 8 8 8Hour Totals1,224 16 152 796 100 58 66 6 30Escalation Amt: $12,385 $309 $1,817 $8,328 $695 $555 $364 $0 $318Labor Totals: $129,471 $2,709 $22,615 $82,332 $7,372 $6,201 $4,456 $1,004 $2,782DIRECT EXPENSES:AmountDescriptionAmount$2,100 B & W 8.5 x 11 $299$71,443 Color 11 x 17 $52$179 55 Gallon Drums $74$73,722Allocated Expenses (6% of Labor) $7,768Filters $2,079Genarator Rental $105Horiba Rental $2,993Peristaltic Pump Rental $2,835PPE $420Pump Tubing $1,260Shipping $3,969Waterra Rental $210Expense Total: $22,063$225,256Applied Professional Services, Inc.Subconsultant Total:Project Total:ESN NorthwestSUBCONSULTANTSSubconsultant NameOnSite Environmental, Inc.March 19, 2012
Current:10/18/2012
2012 2013 2014 2015 2016 2017
Expenditures
Expenditures as of 9/13/12 $17,849
Soil Stabilization Construction $38,500
PMX Amendment; 6/21/12 - 12/31/12 $9,000
Ecology; 9/14/12 - 12/31/12 $2,500
COB; 10/12/12 - 12/31/12 $2,500
Consultant Fee $48,000 $32,000 $32,000 $32,000 $72,000
Ecology $4,000 $4,000 $4,000 $4,000 $4,000
COB $2,500 $2,500 $2,500 $2,500 $2,500
Total Expenditure $70,349 $54,500 $38,500 $38,500 $38,500 $78,500
Revenue
RA Grant (Note 1)$54,969 $45,450
9-11 Memorial Donation $4,500
Total Revenue $59,469 $45,450 $0 $0 $0 $0
NET FUND EXPENSE $10,880 $9,050 $38,500 $38,500 $38,500 $78,500
Note 1 - The Oct, 2012 +/- amendment to the grant adds a long-term
monitoring task, but doesn't add additional grant dollars. The avail-
able grant amount as of 1/1/2012 was $101,204
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT:
Ordinance repealing Ch. 2.34 of
BMC “Gold Mtn. Golf Board of
Directors
Study Session Date: Nov.14th, 2012
COUNCIL MEETING Date: Dec. 5th, 2012
Department: Parks and Rec.
Presenter: Wyn Birkenthal
Phone: 473-5752
SUMMARY:
The advent of the Council’s Public Safety and Parks Committee and the change to consolidated
management of the Gold Mountain Golf Complex no longer require the separate committee known
as the Gold Mountain Board of Directors.
ATTACHMENTS:
Ordinance
FISCAL IMPACTS (Include Budgeted Amount): Time savings from Parks, Public Works, Finance
and Golf course contracted management staff
STUDY SESSION AGENDA: ☒ No Discussion ☐ Full Presentation
STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to pass Ordinance No._____ repealing chapter 2.34 of the BMC related to the Gold Mountain
Golf Complex Board of Directors.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/02/12
1
Gold Mountain Golf Complex Board of Directors - Repealed
ORDINANCE NO. ________
AN ORDINANCE of the City Council of the City of
Bremerton, Washington, repealing Chapter 2.34 of the Bremerton
Municipal Code entitled “Gold Mountain Golf Complex Board of
Directors.”
WHEREAS, the current provisions of Chapter 2.34 of the Bremerton Municipal
Code relating to the Gold Mountain Golf Complex Board of Directors are no longer required due
to the upcoming change in management of the golf course; and
WHEREAS, the Public Safety & Parks Committee is an appropriate forum for
reviewing the operations of the golf course; and
WHEREAS, the City Council desires to repeal in its entirety Chapter 2.34 of the
Bremerton Municipal Code relating to the Gold Mountain Golf Complex Board of Directors;
NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. Chapter 2.34 of the Bremerton Municipal Code entitled
"Gold Mountain Golf Complex Board of Directors" is hereby repealed in its entirety:
Chapter 2.34
GOLD MOUNTAIN GOLF COMPLEX BOARD OF DIRECTORS
2.34.010 ESTABLISHED.
There is established a Gold Mountain Golf Complex Board of Directors, hereinafter
referred to as "Board," which shall act as an advisory body to the Director of Parks and
Recreation, Mayor, and City Council.
2.34.020 MEMBERSHIP AND TERMS OF OFFICE.
(a) The Board shall consist of ten (10) members with six (6) voting members and four
(4) ex officio, nonvoting members as follows:
(1) Two (2) Council members appointed by the Council President;
(2) The Director of Parks and Recreation;
(3) The Director of Public Works and Utilities;
(4) The Director of Financial Services;
(5) The City Forestry Manager;
(6) The Golf Contract Administrator (ex officio, nonvoting);
(7) The two (2) golf professionals (ex officio, nonvoting); and
(8) The Greens Superintendent (ex officio, nonvoting).
2
Gold Mountain Golf Complex Board of Directors - Repealed
(b) The Board members shall remain seated until resignation or until removed by the
City Council. Members of the Board serve at the pleasure of the City Council and may be
removed by the City Council at any time.
(c) The positions assigned and the number of members constituting the Board
membership as set forth herein may be reassigned and reconstituted by the City Council at any
time without further amendment to this chapter.
2.34.030 SALARIES AND PERSONAL EXPENSES.
The members of the Board shall receive no salaries or other remuneration for their services in
such capacity, but shall be entitled to reimbursement of expenses incurred by them in the
discharge of their official duties as may be authorized by city policy.
2.34.040 MEETINGS.
The Board shall establish a regular meeting day and time for its Board meetings. The
Director of Parks and Recreation, or his or her designee, shall serve as Chair of the Board. A
majority of the full membership shall constitute a quorum for conducting business. Any action to
be taken by the Board shall require the concurrence of a simple majority of the members of the
Board qualified to vote.
2.34.050 DUTIES AND RESPONSIBILITIES.
The Board shall have the following duties and responsibilities:
(a) To set administrative policies and rules for the operation of the Gold Mountain
Golf Complex;
(b) To recommend fee structures and annual budget to the City Council for approval;
and
(c) To submit reports to the City Council as requested by the Council regarding all
activities of the Board.
2.34.060 RULES AND PROCEDURES.
The Board may establish rules and procedures for conducting business.
SECTION 2. Severability. If any one or more sections, subsections, or
sentences of this Ordinance are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this Ordinance and the same shall remain in full
force and effect.
SECTION 3. Effective Date. This ordinance shall take effect and be in
force ten (10) days from and after its passage, approval and publication as provided by law.
PASSED by the City Council the___________ day of ____________________, 2012
_________________________________
JIM McDONALD, Council President
3
Gold Mountain Golf Complex Board of Directors - Repealed
Approved this ________ day of ________________________, 2012
_________________________________
PATTY LENT, Mayor
ATTEST: APPROVED AS TO FORM:
__________________________________ ________________________________
SHANNON CORIN, City Clerk ROGER A. LUBOVICH, City Attorney
PUBLISHED the________ day of ______________________, 2012
EFFECTIVE the_________day of ______________________, 2012
ORDINANCE NO. ____________
R:\Legal\Legal\Ordinances\Parks\BMC 2.32 Gold Mountain Board of Directors-repealed.doc
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Adopt Kitsap Regional
Coordinating Council Interlocal Agreement
2012 Amendments.
Study Session Date: 11/14/2012
COUNCIL MEETING Date: 12/05/2012
Department: KRCC
Presenter: Mary McClure
Phone:
SUMMARY: This is a housekeeping item. The Kitsap Regional Coordinating Council (KRCC)
Interlocal Agreement from 2001 has a provision the agreement will be reviewed by legal counsel
every 10 years. KRCC has complied with this provision and proposes revisions to the Interlocal
Agreement through a 2012 Amendment.
ATTACHMENTS: 2012 KRCC proposed revisions to the ILA.
FISCAL IMPACTS (Include Budgeted Amount): None
STUDY SESSION AGENDA: ☐ No Discussion ☒ Full Presentation
STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to adopt the proposed amendments to the Kitsap Regional Coordinating Council Interlocal
Agreement and authorize the Mayor to finalize and execute the amendment with substantially the
same terms and conditions as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/02/12
2012 Amendments 1
KITSAP REGIONAL COORDINATING COUNCIL
INTERLOCAL AGREEMENT
THIS AGREEMENT is made and entered into by and between the undersigned parties
pursuant to provisions of the Interlocal Cooperation Act of 1967, Chapter 39.34 RCW.
WHEREAS, the undersigned members recognize the need and desirability to participate
in a forum for intergovernmental coordination, cooperation, and consultation among member
agencies in order to bring about a continuous and comprehensive regional planning process and
efficient service delivery; and
WHEREAS, the undersigned members desire jointly to undertake continuous,
cooperative study and planning of regional and governmental issues of mutual interest, including
but not limited to development, land use, housing, capital facilities, service, utilities, finances,
public buildings, water supply, water distribution and drainage, air and water pollution, parks
and recreation, transportation planning, and economic development; and
WHEREAS, it is the belief of the undersigned members that regional deliberations,
planning, and review can best be achieved with the creation of a separate legal entity whose
function and activities are subject to policy direction from the undersigned member agencies
according to the provisions of this Agreement; and
WHEREAS, the State Growth Management Act (GMA) requires local jurisdictions to
coordinate and ensure consistency when developing comprehensive land use plans and the
undersigned members desire to establish the Kitsap Regional Coordinating Council as a separate
legal entity to facilitate coordination and consistency of comprehensive land use plans as
required by the GMA; and
WHEREAS, the undersigned members desire to use the Kitsap Regional Coordinating
Council for developing County-wide Planning Policies (CPPs) under the GMA as a framework
to guide Kitsap County and cities situated within the County in developing their comprehensive
land use plans.
THEREFORE, in consideration of mutual promises and covenants herein it is hereby
agreed:
I. NAME
This Agreement establishes the KITSAP REGIONAL COORDINATING COUNCIL
(“Council”), a separate legal entity since 2001.
II. DURATION
The Agreement shall remain in force and effect perpetually or until terminated by
majority vote of the member agencies.
Kitsap Regional Coordinating Council
2012 Amendments 2
III. DEFINITIONS
For the purpose of this Interlocal Agreement, the following terms have the meaning
prescribed to them in this section unless the context of their use dictates otherwise:
A. “Member agency” means a voting and dues paying municipal or other
government entity located within Kitsap County which is a party to this Agreement.
B. “State” means the State of Washington.
C. “Region” means the territory physically lying within the boundaries of Kitsap
County.
D. “Kitsap Regional Coordinating Council” or “Council” means the separate legal
entity established by this Agreement to represent member agencies to carry out those powers and
managerial and administrative responsibilities delegated pursuant to the provisions of this
Agreement.
E. “Majority vote” means more than one-half of the votes cast when a quorum is
present and must include a majority of votes from County commissioners and a majority of votes
from the representatives of at least two separate cities.
F. “Executive Board” shall mean the representatives of member agencies of the
Kitsap Regional Coordinating Council identified in Article IV.B. of this Agreement.
G. “Cost Allocation” means annual dues (the annual allocation among Member
agencies of the cost of Council operations determined by the Executive Board for the purposes of
calculating members’ obligations to contribute to the funding of Council operations for the year,
and for the purposes of calculating obligations and distributions in the event of withdrawal or
termination).
H. “Ex Officio Member” means a non-voting, non-dues paying member of the
Council.
I. “Two-thirds majority vote” means a majority vote and also requires a majority of
votes from County commissioners and a majority of votes from the representatives from at least
two separate cities.
J. “Associate Member” means a member of the Council which is not a party to this
Agreement and who enters into a separate agreement with the Council that establishes the
Associate Member’s level of participation in Council activities.
K. “Executive Director” is the person appointed by the Executive Board to
accomplish the work plan developed by the Executive Board.
2012 Amendments 3
IV. MEMBERSHIP AND REPRESENTATION
A. Membership. Membership (except for Associate Members and Ex Officio
Members) is established by execution of this Agreement and payment of any required cost
allocation as established by the Executive Board.
B. Executive Board. The Executive Board is comprised of the following
representatives of member agencies:
1. County Government: three (3) members of the Kitsap County Board of
Commissioners;
2. City Governments:
a. The Mayor of each city having a population of 10,000 persons or
less;
b. The Mayor and one (1) member of the City Council of each city
having a population between 10,001 persons and 30,000 persons;
c. The Mayor and two (2) members of the City Council of each city
having a population greater than 30,000 persons;
d. A city with a Council/Manager form of government may select one
(1) member of the City Council instead of a Mayor. The number of
additional City Council members representing the city shall be as
described in 2(a-c) above.
3. Port of Bremerton: one (1) representative consisting of a Port
Commissioner.
4. City Council, and Port of Bremerton representatives may be selected by
whatever means established by each specific member agency for a two (2)
year term.
C. The determination of the population of cities will be the most recent annual
population estimate of cities and towns prepared by the Washington State Office of Financial
Management.
D. A municipal or government entity or a federally recognized Indian Tribe that
desires to become a member of the Council must obtain permission to do so by majority vote of
the Executive Board. The required permission applies to any entity that wishes to become a
Member or Ex Officio Member. A municipal or government entity or a federally recognized
Indian tribe that wishes to become an Associate Member must obtain permission to do so by a
majority vote of the Executive Board, and must present a draft agreement for the Executive
Board’s consideration, establishing the proposed terms, duties, powers and privileges for
Associate Member status.
2012 Amendments 4
V. POWER, AUTHORITY, AND PURPOSE
This Agreement does not confer additional substantive powers or authorities on member
agencies. The powers and authorities conferred herein are limited to the powers that each
member agency is authorized by law to perform. The Council has the following power,
authority, and purpose:
A. Provide a regional forum for regional deliberations and cooperative decision-
making by the region’s elected officials in order to bring about a continuous and comprehensive
planning process, and foster cooperation and mediate differences among governments
throughout the region.
B. Consistent with the GMA, coordinate and ensure consistency when developing
comprehensive land use plans.
C. Consistent with the GMA, develop CPPs to be used as a framework to guide the
County and the Cities in developing their comprehensive land use plans;
D. Coordinate actions to provide for the distribution of state and federal grant funds,
including but not limited to federal transportation funding, community development block
grants, and low income housing grants.
E. Undertake continuous, cooperative study and planning of regional and
governmental problems of mutual interest, including but not limited to development, land use,
housing, capital facilities, services, utilities, finances, public buildings, water supply, water
distribution and drainage, air and water pollution, parks and recreation and transportation
planning.
F. Coordinate actions to provide for a sustainable economy and environment for the
region.
G. Carry out such other planning and coordinating activities authorized by majority
vote of the Council including participation in other forums and organizations.
H. Establish Bylaws, to be amended from time to time, that govern the procedures of
the Council. The Bylaws, as may be amended, are incorporated into this Agreement by this
reference as if fully set forth herein.
I. Appoint the Executive Director.
I.J Contract for administrative services and Enter enter into other agreements as
deemed appropriate and/or necessary to implement this Agreement.
J K. Purchase, receive, lease, take by gift, or otherwise acquire, own, hold, improve,
use and otherwise deal in and with real or personal property, or any interest therein, in the name
of the Council.
2012 Amendments 5
K L. Sell, convey, mortgage, pledge, lease, exchange, transfer, and otherwise dispose
of its property and assets.
L.M Sue and be sued, complain and defend, in all courts of competent jurisdiction in
the Council’s name.
M.N. To engage in any other activity necessary to further the Council goals and
purposes to the extent authorized by chapter 39.34 RCW.
N.O. Apply for such federal, state, or private funding of any nature as may become
available to assist the organization in carrying out its purposes and functions.
O.N Identify and examine issues relating to such as governance, growth policies,
development standards, service provision, revenue-cost sharing and municipal annexations in
urban growth areas.
P.O. Strive to represent the consensus of views on growth management and planning
issues among member agencies. The Council makes recommendations on behalf of those
jurisdictions to multi-county regional agencies and State government on behalf of member
agencies, on proposed changes to multi-county regional plans, state plans and laws.
Q.P Represent the views or position of member agencies within the County on issues
of consistency or the resolution of conflicts related to the multi-county regional growth strategy
and transportation plan.
R.Q. Make appointments to committees and boards of multi-county regional
organizations (e.g. Puget Sound Regional Council, Peninsula Regional Transportation Planning
Organization) where appointments are requested to represent more than one member agency of
the Council. Members appointed to such committees and boards shall represent the consensus of
the views of the Council. If consensus is not reached on a particular issue, the members
appointed to such committees and boards shall represent the majority and minority views of the
Council, in order to accurately portray the status of discussions on that issue.
T. Employ personnel, adopt personnel policies, terminate personnel, and all other
associated powers necessary for and relevant to employment matters.
S.U Review the this interlocal Interlocal agreement Agreement no fewer than every
10 years with the assistance of legal counsel.
VI. FINANCING
A. Cost Allocation. All members shall pay the annual cost allocation as described in
the Bylaws. If payment by a member is not paid timely after notice of the cost allocation is
received, the member is subject to having its membership status revoked by majority vote of the
Executive Board.
2012 Amendments 6
B. Local Government Accounting. All services and transfers of property to the
Kitsap Regional Coordinating Council shall be paid and accounted for in accordance with RCW
43.09.210.
VII. FISCAL YEAR AND BUDGET
A. The Fiscal Year. The fiscal year shall coincide with the calendar year.
B. Adoption of Budget. By September of each year the Executive Board shall adopt
a draft annual work program, budget, and cost allocation for the ensuing fiscal year that
identifies anticipated activities, goals, revenues, and expenditures for completing the work
program. The final work program, budget, and cost allocation for the ensuing year shall be
adopted by the Executive Board no later than November of each year. After the Council has
approved the final budget it is forwarded to the County for inclusion as a distinct agency fund
within the Kitsap County Budget. No increase or decrease to the final budget shall occur without
the approval of the Executive Board.
C. Notice of Budget. On or before September 30, the Executive Board shall provide
written notice of the ensuing year’s draft budget, work plan, and cost allocation to the designated
representative(s) of each member agency. On or before November 30, the Executive Board shall
provide written notice of the final budget, work plan, and cost allocation adopted for the ensuing
fiscal year to the designated representative(s) of each member agency.
D. Accounting, Budgeting, and Reporting. The Council shall be subject to the
Budgeting Accounting & Reporting System (BARS) applicable to Category 1 local governments.
E. Fiscal Agent. Kitsap County shall be the fiscal agent for the Council. After
approved by the Executive Board, the Executive Board shall forward the final budget to the
County for inclusion as a distinct agency fund within the Kitsap County Budget known as the
Operating Fund of Kitsap Regional Coordinating Council. The Council may retain a fiscal agent.
The fiscal agent may be a member agency who shall serve and be subject to removal, pursuant to
the terms and conditions as established by agreement between the fiscal agent and the Council.
F. Contracting. All contracts made by or on behalf of the Council shall be in
accordance with state law, including, but not limited to: Chapter 39.04 RCW, and Chapter 42.23
RCW, and Chapter 42.24 RCW.
VIII. WITHDRAWAL FROM AGREEMENT
Any member agency has the right to withdraw from this Interlocal Agreement by giving
the Executive Board six (6) months prior written notice. Unless otherwise provided by future
agreement, any member agency that withdraws shall remain responsible for its financial and
other obligations with regard to Council activities until the effective date of withdrawal and with
regard to agreements to which the Council is a party and which exist at the time of such notice of
withdrawal. Withdrawal by one member agency to this Interlocal Agreement shall not terminate
the Agreement as to any other remaining member agencies. Except as provided in Article IX of
this Agreement, any member agency that withdraws from this Agreement forfeits any rights it
2012 Amendments 7
may have to the Council’s assets; provided, however, such forfeiture shall not take effect if the
Council dissolves within one (1) year of the date of the withdrawal notice.
IX. DISPOSAL OF ASSETS
Upon dissolution of the Council, any Council assets, after payment of all liabilities, costs,
expenses, and charges validly incurred under this Agreement, shall be distributed to member
agencies which are members of the Council on the date of dissolution. Distribution of assets
shall be in proportion to the funding formula for cost allocation as described in the Bylaws, in
accordance with Article VI.B. of the Agreement, and existing at the time of dissolution. The
debts, liabilities, and obligations of the Council shall not constitute a debt, liability, or obligation
of any member agency. If assets cannot reasonably be distributed in proportion to the funding
formula, the Council shall declare the assets to be surplus, and shall offer the assets for sale
according to the requirements of chapter 43.19 RCW, and shall distribute the proceeds from the
sale in proportion to the funding formula established by the Executive Board in accordance with
Article VI.B. of this Agreement.
X. LIABILITY AND INSURANCE
A. Any loss or liability to third parties resulting from negligent acts, errors, or
omissions of the Council, Member agencies (excluding Associate Members), Ex Officio
Members, and/or employees while acting within the scope of their authority under this
Agreement shall be borne by the Council exclusively, and the Council shall defend such parties,
at its cost, upon request by the member agency, ex officio agency, and/or employee.
B. The Executive Board shall obtain commercial general liability, and auto liability
insurance coverage for the Council, Executive Board, and any staff employed by the Council, at
levels no less than $1 million single occurrence and $2 million aggregate for each type of
liability that is insured. The policy shall name each member agency, and their respective elected
officials, officers, agents, and employees as additional insured’s. The Executive Board shall
annually evaluate the adequacy of the Council’s insurance coverage.
C. The Executive Board shall require that all contractors and subcontractors utilized
by the Council obtain insurance coverage consistent with Article X.B.
XI. LEGAL REPRESENTATION
The Council may retain legal counsel. Legal counsel may be an employee of a member
agency, an outside entity, or an individual. In the event of a conflict of interest, the Council may
retain substitute or additional legal counsel. The Kitsap County Prosecuting Attoney’s Office
shall provide day-to-day legal advice and act as legal counsel for the Council and its appointees:
provided that in the event a conflict exists between the Council and its appointees and any other
client represented by the Prosecutor’s Office, then the Bremerton City Attorney’s Office shall
provide such representation; and provided further that in the event a conflict exists between the
Council and its appointees and both a client represented by the Prosecutor’s Office and a client
represented by the Bremerton City Attorney’s Office, then the attorney for the Cities of
Bainbridge Island, Port Orchard, or Poulsbo shall provide such representation; and provided
further that in the event a conflict exists between the Council and its appointees and a client
2012 Amendments 8
represented by the Prosecutor’s Office, and a client represented by the attorneys of the cities, the
Council may retain outside legal counsel in that matter only. Additionally, and regardless of
whether a conflict of interest exists as described in the preceding sentence, the Council may
retain outside legal counsel concerning any matter the Council deems appropriate. Retained
counsel shall serve, and be subject to removal, pursuant to the terms and conditions established
by agreement between legal counsel and the Council. An adjustment in cost allocation to
Members will be made if the Council retains outside legal counsel.
XII. ENTIRE AGREEMENT
This Agreement supersedes all previous Kitsap Regional Coordinating Council interlocal
agreements and all prior discussions, representations, contracts, and/or agreements between the
parties relating to the subject matter of this Agreement and constitutes the entire contract
between the parties.
XIII. MODIFICATION
Except as provided by Article XIX, the terms of this Agreement shall not be altered or
modified unless agreed to in writing by all member agencies and such writing shall be executed
with the same formalities as are required for the execution of this document.
XIV. WAIVER
The failure of any party to insist upon strict performance of any of the terms and
conditions of this Agreement shall not be construed to be a waiver or relinquishment of same,
but the same shall be and remain in full force and effect.
XV. NOTICE
Except as provided in Article XVIII of this Agreement, any notice required by this
Agreement shall be made in writing to the representative(s) identified in Article IV.B. of this
Agreement with a copy of such notice provided to the Executive Director. Notice is effective on
the third day following deposit with the U.S. Postal Service, regular mail.
XVI. SEVERABILITY
If any of the provisions of this Agreement are held illegal, invalid or unenforceable, the
remaining provisions shall remain in full force and effect.
XVII. CHOICE OF LAW AND VENUE
This Agreement shall be governed by the laws of the State of Washington, both as to its
interpretation and performance. Any action at law, suit in equity, or other judicial proceeding
arising in connection with this Agreement may be instituted and maintained only in a court of
competent jurisdiction in Kitsap County, Washington.
2012 Amendments 9
XVIII. CLAIMS
A. Any claim for damages made under chapter 4.96 RCW shall be filed with the
Chair of the Kitsap Regional Coordinating Council, c/o the Clerk of the Kitsap County Board of
Commissioners, 614 Division Street, MS-4, Port Orchard, Washington, 98366.
B. Upon receipt of a claim for damages, or any other claim, a copy of the claim will
be provided by the Clerk of the Board to the Executive Director and to each member of the
Executive Board.
XIX. EXECUTION AND FILING
A. Counterparts. The parties agree that there shall be multiple original signature
pages of this Agreement distributed for signature by the necessary officials of the parties. Upon
execution, the executed original signature pages of this Agreement shall be returned to the Clerk
of the Kitsap County Board of Commissioners, who shall file an executed original of this
Agreement with the Kitsap County Auditor. The Clerk of the Board shall distribute duplicate
conformed copies of the Agreement to each of the parties. Parties that sign on as Members at a
later date will provide original signature pages of this Agreement to the Clerk of the Kitsap
County Board of Commissioners, who shall file the signature pages provided with the Kitsap
County Auditor. The Clerk of the Board shall distribute duplicate conformed copies of the
signature pages filed later, to each of the parties. Addition of parties at a later date will not
constitute a modification under Section XIII of this Agreement.
B. Later Approval and Filing. Later approval and filing of this Agreement by
additional parties as set forth in Article IV, Section D, shall be deemed an authorized amendment
to the Agreement already on file with the Kitsap County Auditor, without the need for
reconsideration and approval by parties that have already approved and executed the Agreement.
XX. EFFECTIVE DATE
This Agreement shall go into effect among and between the parties upon its execution by
all of the parties, as evidenced by the signatures and dates affixed below and upon its filing with
the County Auditor as provided in Article XIX.
IN WITNESS WHEREOF, this Agreement has been executed by each party on the date
set forth below:
Executed this ___ day of _______________, 2012.
CITY OF BAINBRIDGE ISLAND
Debbi Lester, Mayor
2012 Amendments 10
Executed this ___ day of _______________, 2012.
CITY OF BREMERTON
Patty Lent , Mayor
Executed this ___ day of _______________, 2012.
CITY OF PORT ORCHARD
Tim Matthes, Mayor
Executed this ___ day of _______________, 2012.
CITY OF POULSBO
Becky Erickson, Mayor
Executed this ___ day of _______________, 2012.
PORT OF BREMERTON
Larry Stokes, President
Executed this ______ day of __________________, 2012.
ATTEST:
KITSAP COUNTY BOARD OF
COMMISSIONERS
ROBERT GELDER, Chair
CHARLOTTE GARRIDO, Commissioner
Dana Daniels, Clerk of the Board JOSH BROWN, Commissioner
2012 Amendments 11
APPROVED AS TO FORM:
Bainbridge Island City Attorney
Bremerton City Attorney
Port Orchard City Attorney
Poulsbo City Attorney
Port of Bremerton Attorney
Deputy Prosecuting Attorney for Kitsap County
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Appointment of Public Works
Administrative Division Manager at a step
higher than Rate 1 in Pay Band 11
Study Session Date: 11/14/12
COUNCIL MEETING Date: 11/14/12
Department: Public Works & Utilities
Presenter: Chal Martin
Phone: 473-5315
SUMMARY: The Director of Public Works & Utilities proposes to fill the vacant Public Works
Administrative Division Manager position with Milenka Hawkins-Bates. Mrs. Hawkins-Bates’ career
spans 10 years in the public sector including 5 years experience as the Public Works Director and 5
years as the Administrative Assistant to the Public Works Director for the City of Sonoma, California.
The Director has negotiated a starting salary with the applicant and proposes making this
appointment at Rate 4 in Pay Band 11. Per BMC 2.50.032(a), City Council must approve the initial
salary of a newly hired person if the starting salary exceeds Rate 1.
ATTACHMENTS: Resume, Letter of Engagement outlining the negotiated terms of her employment
with the City of Bremerton, and a copy of Pay Band 11.
FISCAL IMPACTS (Include Budgeted Amount): Position is fully funded.
STUDY SESSION AGENDA: ☐ No Discussion ☒ Full Presentation
STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve the hire of Milenka Hawkins-Bates at Rate 4 in Pay Band 11.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/02/12