Comments CO #1 10/26/12
CITY OF BREMERTON
CHANGE ORDER
CONTRACT CHANGE ORDER NO 1
PROJECT NAME Site Final Restoration at Former Chevron Site
PROJECT NO
ORIGINAL CONTRACT AMOUNT
CONTRACTOR Talbot Excavati
PREVIOUSLY APPROVED CHANGES
THIS CHANGE
REVISED CONTRACT AMOUNT
20,810 48 DAYS
;�I�I���7_\7.`?
9,189 52 DAYS
30.000 00 DAYS
flL�i
�
�
�
This Change Order covers changes to the sub�ect contract as described herein The Contractor shall
construct, furnish equipment and materials, and perform all work as necessary or required to
complete the Change Order Items The increase or decrease in contract price shown below includes
any applicable taxes
o �
a� a�
> >
� �
DESCRIPTION OF CHANGES
INCREASE IN (DECREASE) IN CONTRACT
CONTRACT CONTRACT TIME
AMOUNT AMOUNT EXTENSION
($) ($) (DAYS )
Addition work to remove concrete pavement and mix and place 8461 80 0
topsod
NET CHANGE IN CONTRACT AMOUNT
INCREASE OR (DECREASE)
ESTIMATED SALES TAX AT 8 6% 727 72
TOTAL INCLUDING SALES TAX 9,189 52 0
Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims
of any kind or nature arising from or connected with any work either covered or affected by this
Change Order, including, without limitation, claims related to contract time, on-site or home office
overhead, or lost profits Nothing in this Change Order shall limit the City's right to bring a claim for
past performance
CONTRACT CHANGE ORDER NO 'I
PROJECT NAME
Site Final Restoration at Former Chevron Site
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the
contract price specified for each item, including any and all supervision costs and other miscellaneous
costs relating to the change in work, and as to the extension of time allowed, if any, for completion of
the entire work due to said Change Order
This document will become a supplement of the contract and all provisions will apply hereto It is
understood that this Change Order shall be effective when approved by the City of Bremerton
The parties whose names appear below warrant that they are authorized to enter into a change order
that is binding on the parties of this contract In addition, Contractor warrants that it has or will inform
the surety of this change, and shall take appropriate action to modify any bonds required under the
contract to address this change
CONTRACTOR
A roved /
PROJEC MANAGER
DATE /����Z
Recommended � �1��/� �j�G��v DATE �!�////�
CITY ENGINEER
Council action is required as pro�ect cost will exceed approved budget C�Yes ❑ No
Council action is required as change exceeds Mayors authority per BMC 2 76 110 E3 Yes ❑ No
Recommended ��/ �
DIRECTOR OF PUBLIC WORKS AND UTILITIES
Recommended � �
MAYOR
roved �/ �C
APPROVED AS TO FORM:
Bremerton it Attorney
DATE � �� ► I i
��/����
DATE
DATE f ��Z"�
ATTEST: �
Ci Clerk
Page 2 of 2
COUNCIL SUMMARY
CHANGE ORDER TO CONTRACT WITH TALBOT EXCAVATING
Summarv
Remediation of the former Chevron Property was conducted in 2009 and 2011
The work completed under the previous contracts did not account for final
stabilization of the site, nor for removal of fencing and concrete debris In
September, a contract for $20,810 48 was executed with Talbot Excavating for
clearing and grubbing, partial fence removal, and concrete removal and grading
of staged soils across the site Completion of this work is necessary for final
stabilization, and to close an existing Ecology Construction Stormwater General
Permit (WAR 124547) The contract was executed under the Director's authority
in accordance with the City's procurement code
In developing bid documents, staff estimated a concrete debris volume to allow
several contractors to bid the work After work began, it became apparent the
site contained much more concrete than estimated, increasing excavation an
haul costs Also, during the contractor's execution of the work, staff evaluated
alternatives to procure and install topsoil, and believe the most cost effective and
efficient method is to have this work performed by Talbot All necessary work at
the site can be performed by the contractor for a total cost of approximately
$30,000 Following the work by Talbot, the City's street crew will ad�ust
monitoring wells to grade and a separate contract will be issued to hydro seed
the property All work at the site will be complete by Friday, October 12
The requested action is execution of Change Order No 1 to the contract with
Talbot Excavating to add a Force Account line item and increase the total pro�ect
cost to $30,000
Fiscal Summarv
The work is fully funded through the existing Department of Ecology Remediation
Grant, with a$4,500 contribution from the 9-11 Committee
Contract Number: 5184
,
Vendor:
Sub�ect:
Department:
File Class:
Begin Date:
End Date:
Review Date:
Vault Date:
Comments :
TALBOT EXCAVATING
Site Final Restoration at Former Chevron Sie
Engineering
LEG 12-1
9/27/2012
10/10/2012
2014
�
PUBLIC WORKS AGREEMENT
THIS AGREEMENT, is entered mto between the City of Bremerton, a Washmgton
Municipal Corporation ("City"), and Talbot Excavating ("Contractor"), whose mailing address is
191 Dora Avenue Bremerton. WA 98312
The parties agree as follows
1. CONTRACTOR SERVICES. The Contractor shall perform the Work for the City,
generally consistmg of clearmg, grubbmg, demolition, and gradmg as described m
• Attachment B, including
o Cover letter dated September 21, 2012
o Bid Alternatives #3
o Site plan
• Field walk-through on Monday, September 24
2. TIME OF COMPLETION. Contractor shall complete the work by October 10,
2012 Work shall begm withm 5 workmg days of execution of the contract
3. COMPENSATION. The City shall pay the Contractor the total amount of
$20.810.48. which includes Washington State Sales Tax. for the work and services contemplated
in this agreement The City shall pay the Contractor fifty percent (50%) of the Contract amount
upon completion and acceptance of the work by the City, and the remamder upon ful�llment of the
conditions listed below and throughout this agreement
A No Performance Bond Because this contract, includmg applicable sales tax,
is less than $25,000, and pursuant to Chapter 39 08 RCW, the Contractor, m
lieu of providmg the City a performance bond, has elected to have the owner
retam the final fifty percent (50%) of the Contract amount for a period of
sixty (60) days after the date of final acceptance, or until receipt of all
necessary releases from the State Department of Revenue and the State
Department of Labor & Industries and until settlement of any liens filed
under Chapter 60 28 RCW, whichever is later.
B Reta� The City shall NOT hold retamage for this pro�ect
C Defective or Unauthorized Work The City reserves its right to withhold
payment from Contractor for any defective or unauthorized work Defective
or unauthorized work mcludes, without limitation work and materials that
do not conform to the requirements of this agreement, and extra work and
materials furnished without the City's written approval If Contractor is
unable, for any reason, to satisfactorily complete any portion of the work, the
City may complete the work by contract or otherwise, and Contractor shall be
liable to the Crty for any addrtional costs mcurred by the City "Addrtional
costs" shall mean all reasonable costs, mcluding legal costs and attorney fees,
C�ty of Bremerton September 2012
Publ�c Works Agreement wrth Talbot Excavating Page 1 of 8
S�te F�nal Restoraiion at Former Chevron Stte
incurred by the City beyond the maximum Contract pnce specified above.
The City further reserves its nght to deduct the cost to complete the Contract
work, including any Addrtional Costs, from any and all amounts due or to
become due the Contractor
D Final Pavment Waiver of Claims. THE ACCEPTANCE OF FINAL
PAYMENT SHALL CONSTITUTE A WAIVER OF CLAIMS, EXCEPT
THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY
CONTRACTOR AS UNSETTLED AT THE TIME REQUEST FOR FINAL
PAYMENT IS MADE
4. INDEPENDENT CONTRACTOR Contractor is and sha11 be at all tunes actmg as
an mdependent contractor and not as an employee of the Crty The Contractor shall secure at its
expense, and shall be responsible for all payments of income tax, social security, state mdustrial
insurance compensation, unemployment compensation, and all other payroll deductions for the
Contractor, officer, agents, employees and sub-contractors The Contractor shall also secure all
applicable busmess licenses, if required, m connection wrth the contract services, includmg a11
required licenses for Contractor's officers, agents, employees and sub-contractors.
5. TERMINATION. The City may terminate this agreement without nohce for good
cause "Good cause" shall include, wrthout lumtation, any one or more of the following events
A The Contractor's failure to supply sufficient skilled workers or suitable
matenals or equipment
B. The Contractor's failure to prosecute the work wrth such diligence as will
ensure rts physical complerion within the onginal physical completion tune
specified m this Agreement and any extensions of time wluch may have been
granted to the Contractor by change order or otherwise.
C. The Contractor's failure to make full and prompt payment to subcontractors
or for matenal or labor
D The Contractor's disregard of federal, state or local laws, rules or regulations
E. The Contractor's filmg for bankruptcy or becoming ad�udged bankrupt.
F The Contractor disregards the authonty of the City
G The Contractor performs work wluch deviates from the Contract, and
neglects or refuses to correct re�ected work
H The Contractor's failure to provide contmuous competent supervision
The Contractor otherwise violates m any material way any provisions or
requirements of the contract.
If the City termmates tlus agreement for good cause, the Contractor shall not receive any
monies due under this agreement, if any, until the Contract work is completed
Ctty of Bremerton September 2012
Publtc Works Agreement wtth Talbot Excavatrng Page 2 of 8
Site F�nal Restoration at Former Chevron S�te
6. PREVAILING WAGES. Contractor shall file a"Statement of Intent to Pay
Prevailmg Wages," v�nth the State of Washmgton Department of Labor & Industnes pnor to
commencmg the Contract work Contractor shall pay prevailmg wages and comply with Chapter
39 12 of the Revised Code of Waslungton, as well as any other applicable prevailing wage rate
provisions The latest prevailing wage rate revision issued by the Department of Labor and
Industnes is attached as Attachment A
7. CHANGES. The Crty may issue a written or oral work change directive for any
change m the Contract work during the performance of tlus agreement. If the Contractor
determines, for any reason, that a change order is necessary, Contractor must submrt a wntten
change order request to the City's pro�ect manager witlun two (2) busmess days of the date the
Contractor knew or should have known of the facts and events givmg nse to the requested change
If the City deternunes that the change increases or decreases the Contractor's costs or time for
performance, the Crty will make an equitable ad�ustment. The City will attempt, m good faith, to
reach agreement wrth the Contractor on all equitable ad�ustments However, if the parties are
unable to agree, the City will determme the equitable ad�ustment as it deems appropnate The
Contractor shall proceed with the change order work upon receivmg either a written or oral work
change directive from the City or a change order from the City If the Contractor fails to reqiure a
change order wrthui the time allowed, the Contractor waives its nght to make any claim or submit
subsequent change order requests for that portion of the contract work If the Contractor disagrees
with the equitable ad�ustment the Contractor must complete the change order work, however, the
Contractor may elect to protest the ad�ustment as provided below•
A Procedure and Protest by the Contractor If the Contractor disagrees with
anythmg required by a written work change directive, oral work change
duective or change order, mcluding any direction, instruction, interpretation,
or determmation by the City, the Contractor sha11
1 Give a signed wntten notice of protest to the City wrthm one business
day,
2. Supplement the written protest within five (5) calendar days wrth a
written statement that provides the following mformation
a The date of the Contract's protest
b The nature and circumstances that caused the protest
c The provisions in tlus agreement that support the protest
d The estimated dollar cost, if any, of the protested work and
how that estimate was determined
e An analysis of the progress schedule showing the schedule
change or disruption if the Contractor is asserting a schedule
change or disruption
The Contractor shall keep complete records of extra costs and time
mcurred as a result of the protested work. The City shall have access
to any of the Contractor's records needed for evaluatmg the protest
3 The City will evaluate all protests, provided the procedures m this
section aze followed if the City deternunes that a protest is valid, the
City of Bremerton September 2012
Publ�c Works Agreement with Talbot Excavat�ng Page 3 of 8
Site Ftnal Restoratton at Former Chevron S�te
City will ad�ust payment for work or time by an equitable ad�ustment
No ad�ustment will be made for an mvalid protest
B Contractor's Duty to Complete Protested Work In sprte of any protest, the
Contractor shall proceed promptly wrth the work as the City has ordered
C Contractor's Acceptance of Chan� The Contractor accepts all
requirements of a change order by (1) endorsmg it, (2) writmg a separate
acceptance, or (3) not protesting in the way this section provides A change
order that is accepted by Contractor as provided m tlus section shall
constitute full payment and final settlement of all claims for contract time and
for direct, mdirect and consequential costs, includmg costs of delays related
to any work, either covered or affected by the change
D Failure to Protest Constrtutes Waiver By not protesting as this section
provides, the Contractor also waives any addrtional entitlement and accepts
from the City any written or oral order (mcludmg directions, mstruchons,
mterpretations, and determmahon)
E Failure to Follow Procedures Constitutes Waiver By failing to follow the
procedures of tlus section, the Contractor completely waives any clauns for
protested work and accepts form the Crty any wntten or oral order (mcluding
d�rections, mstructions, interpretations, and determination)
8. CLAIMS. The Contractor shall give written notice to the City of all claims other
than change orders vv�tlun fourteen (14) calendar days of the occurrence of the events givmg nse to
the claims Any claim for damages, additional payment for any reason, or extension of time,
whether under tlus agreement or otherwise, shall be conclusively deemed to have been waived by
the Contractor unless a timely wntten claun is made m stnct accordance wrth the apphcable
provisions of this agreement, or, if (and only i� no such provision is applicable, unless that claim is
set forth in detail in wntmg and received by the City withm seven (7) calendar days from the date
Contractor knew, or should have known, of the facts giving nse to the claim At a mirumum, a
Contractor's written claim must mclude the mformation set forth regardmg protests m Section
7A2a-e
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM
WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS
ARISING 1N ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM
OR CAUSED BY THAT DELAY
Contractor must, in any event, file any claim or bnng any su�t ansing from or connected
with tlus agreement witlun 120 calendar days from the date the contract work is complete
9. WARRANTY. The Contractor shall correct all defects m workmanslup and
matenals witlun one year from the date of the Contractor's acceptance of the City's final payrnent
under this contract When defects are corrected, the warranty for that portion of the work shall
extend for one year form the date such conection is completed and accepted by the City. The
Contractor shall begm to conect any defects withm seven (7) calendar days of its receipt of notice
from the City of the defect If the Contractor does not accomplish the corrections within a
Ctty of Bremerton September 2012
Pubkc Works Agreement w�th Talbot Excavat:ng Page 4 of 8
S:te Final Restoration at Former Chevron S�te
reasonable tune, the City may complete the corrections and the Contractor shall pay all costs
mcurred by the Crty m order to accomplish the correction
10. INDENINIFICATION. Contractor shall defend, mdemrufy and hold the City, its
officers, officials, employees, agents and volunteers harmless from any and all clauns, m�unes,
damages, losses or surts mcludmg all legal costs and attorney fees, ansmg out of or in connection
with the performance of tlus agreement, except for m�unes and damages solely caused by the City's
negligence
The Crty's mspection or acceptance of any of Contractor's work when completed shall not
be grounds to avoid any of these covenants of mdemrufication
Should a court of competent �urisdiction determme that this agreement is sub�ect to RCW
4.24 115, then, in the event of liabilrty for damages ansmg out of bodily mjury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor and
the Crty, rts officials, employees, agents and volunteers, the Contractor's liabilrty hereunder shall be
only to the extent of the Contractor's negligence
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS
INDEMNIFICATION CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY
UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF THIS
INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE MUTUALLY
NEGOTIATED THIS WANER
The provisions of this section shall survive the expirarion or termination of tlus agreement
11. INSURANCE. The Contractor shall procure and maintain for the durahon of tlus
agreement, insurance against clauns for in�uries to persons or damage to property that may anse
from or in connection with the performance of the Contract work by the Contractor, its agents,
representatives, employees or subcontractors
Before begmrung the work on the pro�ect descnbed in tlus agreement, the Contractor shall
provide a Certificate of Insurance evidencmg
A Automobile Liabihtv msurance with limrts no less than $1,000,000 combmed
smgle limit per accident for bodily in�ury and property damage, and
B Commercial General Liabilrtv insurance wntten on an occurrence basis with
lumts no less than $2,000,000 combined single limrt per occurrence and
$2,000,000 aggregate for personal m�ury, bodily m�ury and properiy damage
Coverage shall mclude but not be lirruted to blanket contractual,
products/completed operations/broad form property damage, explosion, collapse
and underground (XCU) if applicable, and employer's liability
Any payment of deductible or self msured retention shall be the sole responsibility of the
Contractor
The City reserves the nght to receive a certified copy of all the required insurance policies
Cety of Bremerton September 2012
Publec Works Agreement with Talbot Fxcavating Page 5 of 8
Stte Final Restorahon at Former Chevron Stte
The Crty, its officials, employees, agents and volunteers shall be named as an additional
insured on the insurance policy, as respects work performed by or on behalf of the Contractor and a
copy of the endorsement nammg the City as addrtional insured shall be attached to the Certificate of
Insurance.
The Contractor's msurance shall contam a clause statmg that coverage shall apply
separately to each msured against whom claim is made or suit is brought, except with respects to the
limrts of the insurer's liability
The Contractor's msurance shall be pnmary msurance as respects the City, and the City
shall be given tlurty (30) calendar days pnor wntten notice by certified mail, return receipt
requested, of any cancellation, suspension or matenal change m coverage
If this contract requires work to be performed in or on navigable waters, the Contractor
shall provide insurance wntten on an occurrence basis with lumts no less than $2,000,000 combmed
smgle limit per occurrence and $2,OOQ,000 aggregate for claims made under the Longshoreman and
Harbor Workers Act and the Jones Act
12. MISCELLANEOUS.
A Nondiscnmmation In the lunng of employees for the performance of work
under this Agreement or any sub-contract hereunder, the Contractor, rts sub-
contractors, or any person actmg on behalf of such Contractor or sub-
contractor shall not, by reason of race, religion, color, sex, national ongin, or
the presence of any sensory, mental, physical disabilrty, or sexual orientation
discriminate agamst any person who is qualified and available to perform the
work to wluch the employment relates
B Compliance with Laws. Contractor shall comply with all federal, state and
local laws, rules and regulations throughout every aspect m the performance
of this agreement
C Work Performed at Contractor's Risk Contractor shall take all precauhons
necessary and shall be responsible for the safety of its employees, agents, and
subcontractors in the performance of tlus agreement All work shall be done
at Contractor's own r�sk, and Contractor shall be responsible for any Ioss of
or damage to matenals, tools, or other articles used or held for use m
connection wrth the work
D Nonwaiver of Breach The failure of the Crty to msist upon stnct
performance of any of the terms and nghts contamed herem, or to exercise
any option herein confened in one or more mstances, shall not be constructed
to be a waiver or relmquishment of those terms and rights and they shall
remain in full force and effect
E Governmg Law Tlus agreement shall be governed and construed in
accordance wrth the laws of the State of Washington If any dispute anses
between the Crty and Contractor under any of the provisions of this
agreement, resolution of that dispute shall be available only through the
Gty of Bremerton September 2012
Publ�c Works Agreement wtth Talbot Excavateng Page 6 of 8
S�te Fina[ Restoratton at Former Chevron Site
�unsdiction, venue and rules of the Kitsap County Supenor Court, Kitsap
County, Washmgton.
F Attorney's Fees To the extent not mconsistent wrth RCW 39 04 240, in any
claim or lawsuit for damages ansmg from the parties' performance of this
agreement, each party shall be responsible for payment of rts own legal costs
and attorney's fees incurred m defending or bnngmg such claim or lawsurt,
however, notlung m this subsection shall lunrt the City's r�ght to
mdemrufication under Section 10 of tlus agreement
G Wntten Notice All commwucations regarding tlus agreement shall be sent
to the parties at the addresses hsted on the signature page of tlus agreement,
unless otherwise notified Any wntten notice shall become effective upon
delivery, but m any event three (3) calendar days after the date of mailing by
registered or certified mail, and shall be deemed sufficiently given if sent to
the addressee at the address stated on tlus agreement
H Assignment Any assignment of tlus agreement by the Contractor without
the wntten consent of the City shall be void
Modification. No waiver, alteration, or modification of any of the provisions
of tlus agreement shall be bindmg unless m wntmg and signed by a duly
authonzed representative of the City and Contractor
Severabilrtv If any one or more sections, sub-sections, or sentences of this
agreement are held to be unconstitutional or invalid, that decision shall not
affect the validity of the remammg portion of tlus agreement and the
remainder shall remam in full force and effect
K Entire A�reement The wntten provisions and terms of this agreement,
together with any attached Exlubrts, supersede all pnor verbal statements by
any representahve of the City, and those statements shall not be construed as
formmg a part of or altenng m any manner tlus agreement Tlus agreement
and any attached E�ubrts contam the entire agreement between the parties
Should any language m any Exhibit to this agreement conflict with any
language contamed m tlus agreement, the terms of tlus agreement shall
prevail
Ctty of Bremerton September 2012
Pub[tc Works Agreement wtth Talbot Fxcavattng Page 7 of 8
Stte Final Restoration at Former Chevron S�te
IN WITNESS WHEREOF, the parties below have executed tlus agreement
TALBOT EXCAVATING
�/� ?i���'��--
Stgnature
THE CITY OF BREMERTON
/' _'
[ ti
S�gnature
Print Name KYI.Ei2. i ,c��•
Title• _ �ww�E�
DATE S—�i' Z.7 7�0 � Z
Notices to be sent to:
CONTRACTOR.
Talbox Excavatmg
ATTN• Kyler Talbot
P.O Box 4791
Bremerton, WA 98312
C�ty of Bremerton
Publ�c Works Agreement with Talbot Excavat:ng
Sete F�nal Restorahon at Former Chevron Site
Pnnt Name ��/� y � , v''�/���'/�/
Title. �� � t ��� �
DATE � �a 7 I ( �--
Notices to be sent to:
CITY OF BREMERTON
City of Bremerton
ATTN Shannon Conn, City Clerk
345 Sixth Street
Bremerton, WA 98310
APPROVED AS TO FORM
Bremerton Ci Attorney
�
T T
°�.�
Bremerton City Clerk
September 2012
Page 8 of 8
ATTACH M E NT A
KITSAP COUNTY PREVAiLING WAGE RATES
hrips //fortress wa gov/lm/wagelookup/prvWagelookup aspx
State of Washington
Department of Labor & Industries
Preva�l�ng Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage
The PREVAILING WAGES l�sted here �nclude both the hourly wage rate and the hourly rate of
fnnge benefits. On pubtic works pro�ects, workers wage and benef�t rates must add to not less
than th�s total. A bnef descnption of overt�me calculat�on requ�rements are provided on the
Benefit Code Key.
Journey Level Prevailing Wage Rates for the Effective Date� 9/17/2012
Count Trade Job Classification Wa e Holiday Overtime Note
K�tsap Laborers A�r, Gas Or Electnc Vibrating $40 83 7A 2Y
Screed
Kitsap Laborers Airtrac Drill Operator $42.11 7A 2Y
Kitsap Laborers Ballast Regular Machine $40 83 7A 2Y
Kitsap Laborers Batch We�ghman $34.61 7A 2Y
Kitsap Laborers Br�ck Pavers $40.83 7A 2Y
Kitsap Laborers Brush Cutter $40 83 7A 2Y
Kitsap Laborers Brush Hog Feeder $40.83 7A 2Y
Kitsap Laborers Burner $40.83 7A 2Y
Kitsap Laborers Caisson Worker $42.11 7A 2Y
Kitsap Laborers Carpenter Tender $40 83 7A 2Y
Kitsap Laborers Caulker $40.83 7A 2Y
Kitsap Laborers Cement Dumper-paving $41 59 7A 2Y
Kitsap Laborers Cement F�msher Tender $40.83 7A 2Y
Kitsap Laborers Change House Or Dry Shack $40.83 7A 2Y
Kitsap Laborers Ch�ppmg Gun (under 30 Lbs.) $40.83 7A 2Y
Kitsap Laborers Ch�pping Gun(30 Lbs And Over) $41 59 7A 2Y
Kitsap Laborers Choker Setter $40.83 7A 2Y
Kitsap Laborers Chuck Tender $40.83 7A 2Y
Kitsap Laborers Clary Power Spreader $41.59 7A 2Y
Kitsap Laborers Clean-up Laborer $40.83 7A 2Y
Kitsap Laborers Concrete Dumper/chute $41.59 7A 2Y
Operator
Kitsap Laborers Concrete Form Stnpper $40.83 7A 2Y
Kitsap Laborers Concrete Placement Crew $41.59 7A 2Y
K�tsap Laborers Concrete Saw Operator/core $41.59 7A 2Y
Driller
�Kitsap Laborers Crusher Feeder $34 61 7A 2Y
1 of 13 9/ 17/2012 2 15 PM
https //fortress wa gov/Iru/wagelookup/prvWagelookup aspx
Kitsap Laborers Curing Laborer $40.83 7A 2Y
K�tsap Laborers Demolition Wrecking �t Mov�ng $40 83 7A 2Y
(incl. Charred Matenal)
K�tsap Laborers Ditch Digger $40.83 7A 2Y
K�tsap Laborers Drver $42.11 7A 2Y
Kitsap Laborers DrillOperator $4159 7A 2Y
(hydrautic,diamond)
Kitsap Laborers Dry Stack Walls $40.83 7A 2Y
Kitsap Laborers Dump Person $40.83 7A 2Y
K�tsap Laborers Epoxy Techmc�an $40.83 7A 2Y
Kitsap Laborers Erosion Control Worker $40.83 7A 2Y
Kitsap Laborers Faller & Bucker Chain Saw $41.59 7A 2Y
Kitsap Labore�s Fine Graders $40 83 7A 2Y
Kitsap Laborers Firewatch $34.61 7A 2Y
Kitsap Laborers Form Setter $40.83 7A 2Y
K�tsap Laborers Gabian Basket Buitders $40.83 7A 2Y
K�tsap Laborers Generat Laborer $40.83 7A 2Y
Kitsap Laborers Grade Checker 8 Transit Person $42.11 7A 2Y
Kitsap Laborers Gnnders $40 83 7A 2Y
Kitsap Laborers Grout Machine Tender $40.83 7A 2Y
Kitsap Laborers Groutmen (pressure)includin� $41 59 7A 2Y
Post Tension Beams
Kitsap Laborers Guardrail Erector $40 83 7A 2Y
Kitsap Laborers Hazardous Waste Worker (level $42.11 7A 2Y
A)
Kitsap Laborers Hazardous Waste Worker (level $41.59 7A 2Y
B)
Kitsap Laborers Hazardous Waste Worker (level $40.83 7A 2Y
C)
Kitsap Laborers High Scaler $42 11 7A 2Y
Kitsap Laborers Jackhammer $4159 7A 2Y
Kitsap Laborers Laserbeam Operator $41.59 7A 2Y
Kitsap Laborers Maintenance Person $40.83 7A 2Y
K�tsap Laborers Manhole Builder-mudman $41.59 7A 2Y
Kitsap Laborers Material Yard Person $40.83 7A 2Y
Kitsap Laborers Motorman-dinky Locomotrve $41 59 7A 2Y
Kitsap Laborers Nozzleman (concrete Pump, $41.59 7A 2Y
Green Cutter When Usmg
Combination Of H�gh Pressure
Air �t Water On Concrete ft Rock,
Sandblast, Gumte, Shotcrete,
Water Bta
� K�tsap Laborers Pavement Breaker $41.59 7A 2Y
Kitsap Laborers Rlot Car $34.61 7A 2Y
Kitsap Laborers � P�pe Layer Lead $42.11 7A 2Y
2 of 13 9/ 17/2012 2 15 PM
https //fortress wa gov/lm/wagelookup/prvWagelookup aspx
Kitsap Laborers Ape Layer/ta�lor $41.59 7A 2Y
Kitsap Laborers Ape Pot Tender $41.59 7A 2Y
Kitsap Laborers P�pe Rebner $41 59 7A 2Y
K�tsap Laborers P�pe Wrapper $41.59 7A 2Y
Kitsap Laborers Pot Tender $40.83 7A 2Y
Kitsap Laborers Powderman $42.11 7A 2Y
Kitsap Laborers Powderman's Helper $40 83 7A 2Y
Kitsap Laborers Power Jacks $41 59 7A 2Y
K�tsap Laborers Railroad Spike Puller - Power $41.59 7A 2Y
Kitsap Laborers Raker - Asphalt $42.11 7A 2Y
Kitsap Laborers Re-timberman $42.11 7A 2Y
Kitsap Laborers Remote Equipment Operator $41.59 7A 2Y
Kitsap Laborers Rigger/signal Person $41 59 7A 2Y
Kitsap Laborers Rip Rap Person $40 83 7A 2Y
Kitsap Laborers Rrvet Buster $41 59 7A 2Y
Kitsap Laborers Rodder $4159 7A 2Y
Kitsap Laborers Scaffold Erector $40 83 7A 2Y
Kitsap Laborers Scale Person $40 83 7A 2Y
Kitsap Laborers Sloper (over 20") $41 59 7A 2Y
Kitsap Laborers Sloper Sprayer $40 83 7A 2Y
K�tsap Laborers Spreader (concrete) $41.59 7A 2Y
Kitsap Laborers Stake Hopper $40.83 7A 2Y
Kitsap Laborers Stock P�ler $40 83 7A 2Y
Kitsap Laborers Tamper £t S�milar Electric, Air �t $41 59 7A 2Y
Gas Operated Tools
Kitsap Laborers Tamper (muttipte £t $41 59 7A 2Y
Self-propelled)
� Kitsap Laborers Timber Person - Sewer (lagger, $41.59 7A 2Y
Shorer £t Cr�bber)
Kitsap Laborers Toolroom Person (at Jobsite) $40 83 7A 2Y
K�tsap Laborers Topper $40.83 7A 2Y
Kitsap Laborers Track Laborer $40.83 7A 2Y
Kitsap Laborers Track Liner (power) $41 59 7A 2Y
Kitsap Laborers Traffic Control Laborer $37 01 7A 2Y 8R
K�tsap Laborers Trafflc Control Supervisor $37.01 7A 2Y 8R
� Kitsap Laborers Truck Spotter $40.83 7A 2Y
� K�tsap Laborers Tugger Operator $41.59 7A 2Y
Kitsap Laborers Tunnel Work-Compressed Air $55.89 7A 2Y 8�
Worker 0-30 psi
Kitsap Laborers Tunnel Work-Compressed Air $60.92 7A 2Y 84
Worker 30 01-44 00 ps�
Kitsap Laborers Tunnel Work-Compressed Air $64.60 7A 2Y �
Worker 44 01-54 00 ps�
3 of 13 9/17/2012 2 15 PM
https //fortr�ess wa gov/lcv/wagelookup/prvWagelookup aspx
4of13
� K�tsap Laborers Tunnel Work-Compressed A�r $70.30 7A 2Y �
Worker 54 01-60.� psi
K�tsap Laborers Tunnel Work-Compressed Air $72.42 7A 2Y 8�
Worker 60.01-64.00 psi
Kitsap Laborers Tunnel Work-Compressed A�r $77.52 7A 2Y 8�
Worker 64.01-68.00 psi
K�tsap Laborers Tunnel Work-Compressed Air $79.42 7A 2Y 8�
Worker 68.01-70.00 psi
Kitsap Laborers Tunnel Work-Compressed Air $81 42 7A 1 H �
Worker 70.01-72.00 ps�
Kitsap Laborers Tunnel Work-Compressed Air $83.42 7A 1H 8�
Worker 72 01-74.00 psi
Kitsap Laborers Tunnel Work-Guage and Lock $42.21 7A 2Y 84
Tender
Kitsap Laborers Tunnel Work-Miner $42.21 7A 2Y 8�
Kitsap Laborers Vibrator $41.59 7A 2Y
Kitsap Laborers Vmyl Seamer $40.83 7A 2Y
Kitsap Laborers Watchman $31.46 7A 2Y
K�tsap Laborers Welder $41.59 7A 2Y
Kitsap Laborers Well Pomt Laborer $41.59 7A 2Y
Kitsap Laborers Window Washer/cleaner $31 46 7A 2Y
Kitsap Landscape Construction Irngation Or Lawn Sprinkler $9.25 1
Installers
Kitsap Landscaue Construct�on Landscape Equipment Operators $10.05 1
Or Truck Drivers
Kitsap Landscape Construct�on Landscaping Or Planting $12.92 1
Laborers
K�tsap Power Equ�pment Operators Asphalt Plant Operators $51 89 7A 3C 8P
Kitsap Power Equipment Operators Assistant Engineer $48 62 7A 3C 8P
Wtsap Power Equ�pment Operators Barner Machine (zipper) $51.40 7A 3C 8P
Kitsap Power Equipment Operators Batch Plant Operator, Concrete $51.40 7A 3C 8P
Kitsap Power Equipment Operators Bobcat $48 62 7A 3C 8P
Kitsap Power Equ�pment Operators Brokk - Remote Demolition $48.62 7A 3C 8P
Equipment
Kitsap Power EQU�pment Operators Brooms $48.62 7A 3C 8P
Kitsap Power Equ�pment Operators Bump Cutter $51 40 7A 3C 8P
Kitsap Power Equipment Operators Cableways $51 89 7A 3C 8P �
Kitsap Power Equipment Operators Chipper $51 40 7A 3C 8P
Kitsap Power Equipment Operators Compressor $48.62 7A 3C 8P
Kitsap Power Equipment Operators Concrete Pump Truck Mount $51.89 7A 3C 8P
With Boom Attachment Over 42
M
� Kitsap Power Equ�pment Operators Concrete F�msh Machme -laser $48 62 7A 3C 8P
Screed
9/17/2012 2 15 PM
https //fortress wa gov/lm/wagelookup/prvWagelookup aspx
Kitsap Power Equ�pment Operators Concrete Pump - Mounted Or $50 98 7A 3C 8P
Trailer High Pressure Lme Pump,
Pump H�gh Pressure.
K�tsap Power Equipment Operators Concrete Pump: Truck Mount $51.40 7A 3C 8P
W�th Boom Attachment Up To
42m
Kitsap Power Equipment Operators Conveyors $50.98 7A 3C 8P
Kitsap Power Equipment Operators Cranes: 20 Tons Through 44 Tons $51.40 7A 3C 8P
With Attachments
Kitsap Power Equipment Operators Cranes• 20 Tons Through 44 Tons $51.40 7A 3C 8P
With Attachments Overhead,
Bndge Type Crane• 20 Tons
Through 44 Tons
Kitsap Power Equ�pment Operators Cranes• 100 Tons Through 199 $52.44 7A 3C 8P
Tons, Or 150' Of Boom (including
Jib With
Kitsap Power Equipment Operators Cranes: 100 Tons Through 199 $52.44 7A 3C 8P
Tons, or 150' of boom (including
�ib with attachments);
Overhead, bridge type, 100 tons
and over; Tower crane up to 175'
in height, base to boom.
K�tsap Power Equipment Operators Cranes: 200 Tons To 300 Tons, Or $53.01 7A 3C 8P
250' Of Boom (including Jib With
Attachments)
Kitsap Power Equipment Operators Cranes 45 Tons Through 99 Tons, $51 89 7A 3C 8P
Under 150' Of Boom (induding
Jib With Attachments)
Kitsap Power Equipment Operators Cranes: A-frame - 10 Tons And $48 62 7A 3C 8P
Under
Kitsap Power Equipment Operators Cranes: Fnction 100 Tons $53 01 7A 3C 8P
Through 199 Tons
K�tsap Power Equipment Operators Cranes. Friction Over 200 Tons $53 57 7A 3C 8P
Kitsap Power Equipment Operators Cranes• Over 300 Tons Or 300' Of $53.57 7A 3C 8P
Boom (induding Jib With
Attachments)
Kitsap Power Equipment Operators Cranes: Through 19 Tons W�th $50.98 7A 3C 8P
Attachments A-frame Over 10
Tons
Kitsap Power Equipment Operators Crusher $51 40 7A 3C 8P
Kitsap Power Equipment Operators Deck Engineer/deck Winches $51.40 7A 3C 8P
(power)
Kitsap Power Equipment Operators Derruks, On Bu�lding Work $51.89 7A 3C 8P
� Kitsap Power Epuipment Operators Dozer Quad 9, HD 41, D10 and $51 89 7A 3C 8P
Over
� Kitsap Power Equipment Operators Dozers D-9 �t Under $50 98 7A 3C 8P
Kitsap Power Equipment Operators Dnll O�lers• Auger Type, Truck Or $50.98 7A 3C 8P
Crane Mount
Kitsap Power Equipment Operators Dnlling Machine $51.40 7A 3C 8P
5 of 13 9/17/2012 2 15 PM
https //fortress wa gov/Irn/wagelookup/prvWagelookup aspx
K�tsap Power Equipment Operators Elevator And Man-lift: $48.62 7A 3C 8P
Permanent And Shaft Type
Kitsap Power Equipment Operators Fimshmg Mach�ne, Bidwell And $51.40 7A 3C 8P
Gamaco tt Sim�lar Equ�pment
Kitsap Power Equ�pment Operators Forklift 3000 Lbs And Over With $50.98 7A 3C 8P
Attachments
Kitsap Power Equipment Operators Forklifts• Under 3000 Lbs. With $48.62 7A 3C 8P
Attachments
Kitsap Power Equipment Operators Grade Engineer• Using Blue $51 40 7A 3C 8P
Prints, Cut Sheets, Etc
Kitsap Power Equipment Operators Gradechecker/stakeman $48 62 7A 3C 8P
Kitsap Power Equipment Operators Guardrail Punch $51.40 7A 3C 8P
Kitsap Power Equ�pment Operators Guardrail Punch/Auger $51 40 7A 3C 8P
Kitsap Power Equipment Operators Hard Ta�l End Dump Articulating $51.89 7A 3C 8P
Off- Road Equipment 45 Yards. 8
Over
Kitsap Power Equipment Operators Hard Ta�l End Dump Articulating $51.40 7A 3C 8P
Off-road Equipment Under 45
Yards
Kitsap Power Equipment Operators Horizontal/directional Dr�ll $50.98 7A 3C 8P
Locator
Kitsap Power Equipment Operators Horizontal/directional Dnll $51.40 7A 3C 8P
Operator
Kitsap Power Equ�pment Operators Hydralifts/boom Trucks Over 10 $50.98 7A 3C 8P
Tons
Kitsap Power Equ�pment Operators Hydral�fts/boom Trucks, 10 Tons $48 62 7A 3C 8P
And Under
Kitsap Power Equ�pment Operators Loader, Overhead 8 Yards £t $52.44 7A 3C 8P
Over
Kitsap Power Equ�pment Operators Loader, Overhead, 6 Yards But $51 89 7A 3C 8P
Not Includmg 8 Yards
Kitsap Power Equ�pment Operators Loaders, Overhead Under 6 Yards $51.40 7A 3C 8P
K�tsap Power Equ�pment Operators Loaders, Plant Feed $51 40 7A 3C 8P
Kitsap Power Equ�pment Operators Loaders. Elevating Type Belt $50.98 7A 3C 8P
Kitsap Power Equipment Operators Locomot�ves, All $51.40 7A 3C 8P
Kitsap Power Equipment Operators Matenal Transfer Device $51 40 7A 3C 8P
Kitsap Power Equ�pment Operators Mechamcs, All (leadmen -$0 50 $52.44 7A 3C 8P
Per Hour Over Mechamc)
Kitsap Power Equipment Operators Mixers: Asphalt Plant $51 40 7A 3C 8P
K�tsap Rower Equipment Operators Motor Patrol Grader - $50.98 7A 3C 8P
Non-flmshmg
K�tsap Power Equ�pment Operators Motor Patrol Graders, Fimshing $51.89 7A 3C 8P
Kitsap Power Equ�pment Operators Mucking Machine, Mole, Tunnel $51 89 7A 3C 8P
Dnll, Boring, Road Header
And/or Shield
6 of 13 9/17/2012 2 15 PM
Mtps //fortress wa gov/lcu/wagelookup/prvWagetookup aspx
Kitsap Power Equipment Operators Oil Distnbutors, Blower $48.62 7A 3C 8P
Distnbut�on £t Mulch Seeding
Operator
K�tsap Power Equipment Operators Outs�de Ho�sts (elevators And $50 98 7A 3C 8P
Manlifts), A�r Tuggers,strato
Kitsap Power Equipment Operators Overhead, Bndge Type Crane: 20 $51.40 7A 3C 8P
Tons Through 44 Tons
Kitsap Power Equipment Operators Overhead, Bndge Type 100 Tons $52.44 7A 3C 8P
And Over
Kitsap Power Equipment Operators Overhead, Bndge Type. 45 Tons $51 89 7A 3C 8P
Through 99 Tons
Kitsap Power Equipment Operators Pavement Breaker $48 62 7A 3C 8P
Kitsap Power Equipment Operators P�le Dnver (other Than Crane $51.40 7A 3C 8P
Mount)
Kitsap Power Equipment Operators Plant Oiler - Asphalt, Crusher $50.98 7A 3C 8P
Kitsap Power Equipment Operators Posthole Digger, Mechamcal $48.62 7A 3C 8P
Kitsap Power Equipment Operators Power Plant $48.62 7A 3C 8P
Kitsap Power Equipment Operators Pumps - Water $48.62 7A 3C 8P
Kitsap Power Equipment Operators Quad 9, Hd 41, D10 And Over $51.89 7A 3C 8P
Kitsap Power Equipment Operators Quick Tower - No Cab, Under 100 $48 62 7A 3C 8P
Feet In He�ght Based To Boom
Kitsap Power Equipment Operators Remote Control Operator On $51 89 7A 3C 8P
Rubber Tired Earth Moving
Equipment
Kitsap Power Equipment Operators Rigger And Bellman $48 62 7A 3C 8P
K�tsap Power Equ�pment Operators Rollagon $51.89 7A 3C 8P
Kitsap Power Equipment Operators Rotler, Other Than Plant Mix $48 62 7A 3C 8P
Kitsap Power Equipment Operators Roller, Plant Mix Or Mult�-lift $50 98 7A 3C 8P
Matenats
Kitsap Power Equipment Operators Roto-m�ll, Roto-gnnder $51.40 7A 3C 8P
Kitsap Power Equipment Operators Saws - Concrete $50 98 7A 3C 8P
Kitsap Power Equipment Operators Scraper, Self Propelled Under 45 $51 40 7A 3C 8P
Yards
K�tsap Power Equipment Operators Scrapers - Concrete tt Carry All $50 98 7A 3C 8P
K�tsap Power Equipment Operators Scrapers, Self-propelled 45 $51.89 7A 3C 8P
Yards And Over
Kitsap Power Equipment Operators Servue Engineers - Equ�pment $50 98 7A 3C 8P
Kitsap Power Equipment Operators Shotcrete/gumte Equipment $48 62 7A 3C 8P
Kitsap Power Equipment Operators Shovel , Excavator, Backhoe, $50.98 7A 3C 8P
Tractors Under 15 Metnc Tons
Kitsap Power Equipment Operators Shovel, Excavator, Backhoe: $51 89 7A 3C 8P
Over 30 Metr�c Tons To 50 Metric
Tons
Kitsap Power Equipment Operators Shovel, Excavator, Backhoes, $51.40 7A 3C 8P
Tractors• 15 To 30 Metnc Tons
7 of 13 9/ 17/2012 2 15 PM
https //fortress wa gov/Im/wagelookup/prvWagelookup aspx
K�tsap Power Equ�pment Operators Shovel, Excavator, Backhoes: $52.44 7A 3C 8P
Over 50 Metric Tons To 90 Metric
Tons
K�tsap Power Equipment Operators Shovel, Excavator, Backhoes: $53.01 7A 3C 8P
Over 90 Metric Tons
Kitsap Power Equipment Operators Slipform Pavers $51.89 7A 3C 8P
K�tsap Power Equipment Operators Spreader, Topsider 8 Screedman $51 89 7A 3C 8P
Kitsap Power Equ�pment Operators Subgrader Trimmer $51.40 7A 3C 8P
Kitsap Power Equipment Operators Tower Bucket Elevators $50.98 7A 3C 8P
Kitsap Power Equipment Operators Tower Crane Over 175'in He�ght, $53.01 7A 3C 8P
Base To Boom
Kitsap Power Equipment Operators Tower Crane Up To 175' In He�ght $52.44 7A 3C 8P
Base To Boom
Kitsap Power Equipment Operators Transporters, All Track Or Truck $51.89 7A 3C 8P
Type
Kitsap Power Equipment Operators Trenching Machines $50 98 7A 3C 8P
Kitsap Power Equipment Operators Truck Crane Oiler/drrver - 100 $51.40 7A 3C 8P
Tons And Over
Kitsap Power Equipment Operators Truck Crane Oiter/drrver Under $50.98 7A 3C 8P
100 Tons
Kitsap Power Equipment Operators Truck Mount Portable Conveyor $51 40 7A 3C 8P
K�tsap Power Equipment Operators Welder $51 89 7A 3C 8P
Kitsap Power Equipment Operators Wheel Tractors, Farmall Type $48.62 7A 3C 8P
Kitsap Power Equipment Operators Yo Yo Pay Dozer $51 40 7A 3C 8P
Kitsap Power Equipment Operators- Asphalt Plant Operators $51.89 7A 3C 8P
Underground Sewer £t Water
Kitsap Power Equipment Operators- Assistant Engineer $48 62 7A 3C 8P
Underground Sewer Ft Water
Kitsap Power Equipment Operators- Barrier Machine (z�pper) $51 40 7A 3C 8P
Underground Sewer £t Water
Kitsap Power Equipment Operators- Batch Ptant Operator, Concrete $51.40 7A 3C 8P
Under�round Sewer �t Water
Kitsap Power Equipment Operators- Bobcat $48.62 7A 3C 8P
Under�round Sewer £t Water
Kitsap Power Equ�pment Operators- Brokk - Remote Demolition $48.62 7A 3C 8P
Under�round Sewer tt Water Equipment
Kitsap Power Equ�pment Operators- Brooms $48.62 7A 3C 8P
Under�round Sewer �t Water
Kitsap Power Equipment Operators- Bump Cutter $51.40 7A 3C 8P
UnderQround Sewer �t Water
Kitsap Power Equipment Operators- Cableways $51.89 7A 3C 8P
Under�round Sewer £t Water
Kitsap Power EQUipment Operators- Chipper $51 40 7A 3C 8P
Under$round Sewer ft Water
Kitsap Power Equipment Operators- Compressor $48.62 7A 3C 8P
UnderQround Sewer �t Water
8 of 13 9/17/2012 2 15 PM
https //forh�ess wa gov/Iru/wagelookup/prvWagelookup aspx
K�tsap Power Equipment Operators- Concrete Pump: Truck Mount $51.89 7A 3C 8P
Under$round Sewer & Water With Boom Attachment Over 42
M
K�tsap Power Equipment Operators- Concrete F�msh Mach�ne -laser $48 62 7A 3C 8P
UnderQround Sewer £t Water Screed
Kitsap Power Equipment Operators- Concrete Pump - Mounted Or $50.98 7A 3C 8P
Under�round Sewer £t Water Trailer High Pressure Line Pump,
Pump High Pressure.
Kitsap Power Equipment Operators- Concrete Pump: Truck Mount $51.40 7A 3C 8P
Under�round Sewer & Water With Boom Attachment Up To
42m
K�tsap Power Equipment Operators Conveyors $50.98 7A 3C 8P
Under�round Sewer �t Water
Kitsap Power Equipment Operators- Cranes: 20 Tons Through 44 Tons $51 40 7A 3C 8P
UnderQround Sewer tt Water With Attachments
Kitsap Power Equipment Operators- Cranes: 20 Tons Through 44 Tons $51.40 7A 3C 8P
Under�round Sewer ft Water With Attachments Overhead,
Br�dge Type Crane. 20 Tons
Through 44 Tons
K�tsap Power Equipment Operators- Cranes• 100 Tons Through 199 $52.44 7A 3C 8P
Underground Sewer £t Water Tons, Or 150' Of Boom (including
J�b Wrth
Kitsap Power Equipment Operators- Cranes: 200 Tons To 300 Tons, Or $53 01 7A 3C 8P
Under�round Sewer £t Water 250' Of Boom (including Jib With
Attachments)
Kitsap Power Equipment Operators Cranes 45 Tons Through 99 Tons, $51 89 7A 3C 8P
Under�round Sewer �t Water Under 150' Of Boom (inctuding
Jib W�th Attachments)
Kitsap Power Equipment Operators- Cranes• A-frame - 10 Tons And $48.62 7A 3C 8P
Underground Sewer £t Water Under
Kitsap Power Equipment Operators- Cranes. Fnction 100 Tons $53 01 7A 3C 8P
Underground Sewer & Water Through 199 Tons
K�tsap Power Equipment Operators- Cranes: Friction Over 200 Tons $53.57 7A 3C 8P
Underground Sewer �t Water
Kitsap Power Equipment Operators- Cranes• Over 300 Tons Or 300' Of $53.57 7A 3C 8P
Under�round Sewer ft Water Boom (including Jib W�th
Attachments)
K�tsap Power Equipment Operators- Cranes Through 19 Tons With $50 98 7A 3C 8P
Underground Sewer Ft Water Attachments A-frame Over 10
Tons
� Kitsap Power Equipment Operators- Crusher $51.40 7A 3C 8P
UnderQround Sewer 8 Water
Kitsap Power Equipment Operators- Deck Engineer/deck Wmches $51 40 7A 3C 8P
Underground Sewer 8 Water (power)
Kitsap Power Equipment Operators- Derncks, On Buildmg Work $51.89 7A 3C 8P
UnderQround Sewer �t Water
K�tsap Power Equipment Operators- Dozer Quad 9, HD 41, D10 and $51 89 7A 3C 8P
Underground Sewer £t Water Over
9 of 13 9/ 17/2012 2 15 PM
https //forh�ess wa gov/lm/wagelookup/prvWagelookup aspx
Kitsap Power Equipment Operators- Dozers D-9 �t Under $50.98 7A 3C 8P
Underground Sewer �t Water
Kitsap Power Equipment Operators- Drill O�lers Auger Type, Truck Or $50 98 7A 3C SP
UnderQround Sewer tt Water Crane Mount
K�tsap Power Equipment Operators- Drilling Machine $51.40 7A 3C 8P
Under�round Sewer �t Water
Kitsap Power Equipment Operators- Elevator And Man-lift• $48.62 7A 3C 8P
Under�round Sewer 8 Water Permanent And Shaft Type
Kitsap Power Equipment Operators- Fimshing Machine, Bidwell And $51.40 7A 3C 8P
Under�round Sewer £t Water Gamaco £t Simitar Equipment
Kitsap Power Equipment Operators- Forklift. 3000 Lbs And Over With $50 98 7A 3C 8P
UnderQround Sewer £t Water Attachments
Kitsap Power Equipment Operators- Forklifts: Under 3000 Lbs. With $48.62 7A 3C 8P
Under�round Sewer �t Water Attachments
K�tsap Power Equipment Operators- Grade Engineer: Using Blue $51.40 7A 3C 8P
Under�round Sewer ft Water Prints, Cut Sheets, Etc
K�tsap Power Equipment Operators- Gradechecker/stakeman $48 62 7A 3C 8P
Under�round Sewer 8 Water
Kitsap Power Equipment Operators- Guardrail Punch $51 40 7A 3C 8P
Under�round Sewer �t Water
K�tsap Power Equipment Operators- Guardrail Punch/Auger $51 40 7A 3C SP
Under�round Sewer �t Water
Kitsap Power Equ�pment Operators- Hard Tail End Dump Articulating $51 89 7A 3C 8P
Under�round Sewer & Water Off- Road Equipment 45 Yards. £t
Over
Kitsap Power Equipment Operators- Hard Tail End Dump Articulating $51 40 7A 3C 8P
Under�round Sewer 8 Water Off-road Equipment Under 45
Yards
Kitsap Power Equipment Operators- Honzontal/d�rectional Drill $50 98 7A 3C 8P
UnderQround Sewer & Water Locator
K�tsap Power Equipment Operators- Horizontal/directional Dr�ll $51 40 7A 3C 8P
Under�round Sewer & Water Operator
K�tsap Power Equipment Operators- Hydral�fts/boom Trucks Over 10 $50.98 7A 3C 8P
Under round Sewer & Water Tons
Kitsap Power Equipment Operators- Hydralifts/boom Trucks, 10 Tons $48 62 7A 3C 8P
Underground Sewer �t Water And Under
Kitsap Power Equipment Operators- Loader, Overhead 8 Yards. �t $52 44 7A 3C 8P
Under�round Sewer �t Water Over
Kitsap Power Equ�pment Operators- Loader, Overhead, 6 Yards. But $51 89 7A 3C 8P
Under�round Sewer �t Water Not Including 8 Yards
Kitsap Power Equipment Operators- Loaders, Overhead Under 6 Yards $51.40 7A 3C 8P
Under$round Sewer 8 Water
K�tsap Power Equipment Operators Loaders, Plant Feed $51.40 7A 3C 8P
Under�round Sewer $ Water
Kitsap Power E ui ment 0 erators- Loaders. Elevating Type Belt $50 98 7A 3C 8P
Under�round Sewer &t Water
� Kitsap Power Equipment Operators Locomotrves, All $51.40 7A 3C 8P
Under�round Sewer £t Water �
10 of 13 9/17/2012 2 15 PM
Mtps //forlress wa gov/lm/wagelookup/prvWagelookup aspx
K�tsap Power Equipment Operators- Matenal Transfer Devue $51.40 7A 3C 8P
Underground Sewer �t Water
K�tsap Power Equ�pment Operators- Mechamcs, All (leadmen -$0.50 $52.44 7A 3C 8P
Under$round Sewer £t Water Per Hour Over Mechamc)
Kitsap Power Equipment Operators- Mixers: Asphalt Plant $51.40 7A 3C 8P
Under�round Sewer &t Water
Kitsap Power Equipment Operators- Motor Patrol Grader - $50 98 7A 3C 8P
Under�round Sewer & Water Non-fimshing
Kitsap Power Equipment Operators- Motor Patrol Graders, Fimshing $51.89 7A 3C 8P
Under�round Sewer & Water
Kitsap Power Equipment Operators- Mucking Mach�ne, Mole, Tunnet $51 89 7A 3C 8P
Under$round Sewer £t Water Drill, Boring, Road Header
And/or Shield
Kitsap Power Equipment Operators- Oil Distnbutors, Blower $48.62 7A 3C 8P
Underground Sewer �t Water Distnbution Ft Mulch Seeding
Operator
Kitsap Power Equipment Operators- Outs�de Hoists (elevators And $50 98 7A 3C 8P
Under�round Sewer �t Water Manlifts), Air Tuggers,strato
Kltsap Power Equ�pment Operators- Overhead, Bndge Type Crane: 20 $51 40 7A 3C 8P
Underground Sewer �t Water Tons Through 44 Tons
K�tsap Power Equipment Operators- Overhead, Bndge Type 100 Tons $52 44 7A 3C 8P
Under�round Sewer �t Water And Over
K�tsap Power Equipment Operators- Overhead, Bndge Type• 45 Tons $51.89 7A 3C 8P
Under�round Sewer ft Water Through 99 Tons
Kitsap Power Equipment Ouerators- Pavement Breaker $48.62 7A 3C 8P
Under�round Sewer �t Water
Kitsap Power Equipment Operators- P�le Dnver (other Than Crane $51 40 7A 3C 8P
Under�round Sewer tt Water Mount)
Kitsap Power Equipment Operators- Plant Oiter - Asphalt, Crusher $50.98 7A 3C 8P
Under�round Sewer 8 Water
Kitsap Power Equipment Operators- Posthole Digger, Mechamcal $48.62 7A 3C 8P
Under$round Sewer £t Water
Kitsap Power Equipment Operators- Power Plant $48 62 7A 3C 8P
UnderQround Sewer £t Water
K�tsap Power Equipment Operators- Pumps - Water $48 62 7A 3C 8P
Under�round Sewer & Water
Kitsap Power Equipment Operators- Quad 9, Hd 41, D10 And Over $51 89 7Q 3C 8P
Under$round Sewer �t Water
� Kitsap Power Equipment Operators- Quuk Tower - No Cab, Under 100 $48.62 7A 3C 8P
Under�round Sewer Ft Water Feet In Height Based To Boom
Kitsap Power Equipment Operators- Remote Control Operator On $51.89 7A 3C 8P
Underground Sewer ft Water Rubber Tired Earth Moving
Equipment
K�tsap Power Equipment Operators- R�gger And Bellman $48.62 7A 3C 8P
Underqround Sewer ft Water
Kitsap Power EQUipment Operators- Rollagon $51.89 7A 3C 8P
Under�round Sewer £t Water
11 of 13 9/ 17/2012 2 15 PM
https //fortress wa gov/Im/wagelookup/prvWagelookup aspx
K�tsap Power Equipment Operators- Rotler, Other Than Plant Mix $48 62 7A 3C 8P
Under�round Sewer �t Water
Kitsap Power Equ�pment Operators- Roller, Plant Mix Or Multi-lift $50 98 7A 3C 8P
Under�round Sewer & Water Materiats
Kitsap Power Equipment Operators- Roto-m�ll, Roto-gnnder $51.40 7A 3C 8P
Under�round Sewer £t Water
Kitsap Power Equ�pment Operators- Saws - Concrete $50 98 7A 3C 8P
Under�round Sewer �t Water
Kitsap Power Equ�pment Operators- Scraper, Self Propelled Under 45 $51 40 7A 3C 8P
Underground Sewer �t Water Yards
K�tsap Power Equipment Operators- Scrapers - Concrete 8 Carry All $50 98 7A 3C 8P
UnderQround Sewer �t Water
Kitsap Power Equipment Operators- Scrapers, Self-propelled: 45 $51.89 7A 3C 8P
Under�round Sewer £t Water Yards And Over
Kitsap Power Equipment Operators- Service Engineers - Equipment $50 98 7A 3C 8P
Under�round Sewer 8 Water
Kitsap Power Equipment Operators- Shotcrete/gumte Equipment $48 62 7A 3C 8P
Underground Sewer tt Water
Kitsap Power Equipment Operators Shovel , Excavator, Backhoe, $50.98 7A 3C 8P
UnderQround Sewer £t Water Tractors Under 15 Metnc Tons.
Kitsap Power Equipment Operators- Shovet, Excavator, Backhoe: $51.89 7A 3C 8P
Under�round Sewer ft Water Over 30 Metnc Tons To 50 Metru
Tons
Kitsap Power Equipment Operators- Shovet, Excavator, Backhoes, $51 40 7A 3C 8P
Under�round Sewer Ft Water Tractors: 15 To 30 Metnc Tons
Kitsap Power Equipment Operators- Shovel, Excavator, Backhoes $52 44 7A 3C 8P
Underground Sewer 8 Water Over 50 Metnc Tons To 90 Metric
Tons
Kitsap Power EQUipment Operators- Shovel, Excavator, Backhoes. $53 01 7A 3C 8P
UnderQround Sewer �t Water Over 90 Metric Tons
Kitsap Power Equipment Operators- Sl�pform Pavers $51.89 7A 3C 8P
Under�round Sewer £t Water
K�tsap Power Equipment Operators- Spreader, Topsider �t Screedman $51.89 7A 3C 8P �
Under�round Sewer �t Water
Kitsap Power Equipment Operators- Subgrader Trimmer $51.40 7A 3C 8P
Under�round Sewer �t Water
Kitsap Power Equipment Operators- Tower Bucket Elevators $50.98 7A 3C 8P
UnderQround Sewer �t Water
Kitsap Power Equ�pment Operators- Tower Crane Over 175'in Height, $53 01 7A 3C 8P
Underqround Sewer £t Water Base To Boom
Kitsap Power Equipment Operators- Tower Crane Up To 175' In He�ght $52.44 7A 3C 8P
Under�round Sewer £t Water Base To Boom
Kitsap Power Equipment Operators- Transporters, All Track Or Truck $51 89 7A 3C 8P
Under�round Sewer Ft Water Type
Kitsap Power Epuipment Operators- Trenching Machines $50.98 7A 3C 8P
UnderQround Sewer Ft Water
Kitsap Power Equipment Operators- Truck Crane Oiler/dnver - 100 $51.40 7A 3C 8P
Underground Sewer £t Water Tons And Over
12 of 13 9/17/2012 2 15 PM
https //fortress wa gov/Im/wagelookup/prvWagelookup aspx
13 of 13
Kitsap Power Equ�pment Operators- Truck Crane Oiler/driver Under $50 98 7A
Under�round Sewer tt Water 100 Tons
Kitsap Power Equipment Operators- Truck Mount Portable Conveyor $51.40 7A
Under�round Sewer £t Water
Kitsap Power Equipment Operators- Welder $51 89 7A
Underground Sewer �t Water
K�tsap Power Equipment Operators- Wheel Tractors, Farmalt Type $48 62 7A
Under�round Sewer �t Water
Kitsap Power Equipment Operators- Yo Yo Pay Dozer $51.40 7A
Under�round Sewer &t Water
Kitsap Truck Dnvers Asphalt Mix Over 16 Yards (W. $47 91 5D
WA-Joint Counal 28)
K�tsap Truck Drivers Asphalt Mix To 16 Yards (W $47 07 5D
WA-Joint Council 28)
Kitsap Truck Dnvers Dump Truck $19.60
Kitsap Truck Dnvers Dump Truck And Trailer $19 60
Kitsap Truck Dnvers Other Trucks $18.37
Kitsap Truck Dnvers Transit Mixer $20.79
8P
8P
8P
8P
8P
8L
8L
9/ 17/2012 2 15 PM
ATTACH M E NT B
SCOPE OF WORK
September 21, 2012
ATTN: Kyler Talbot
REQUEST FOR BID
The City is requesting bids from three to four Contractors on the Small Works Roster for site stabdization at the former
Chevron site ad�acent to Evergreen Park The site address is 1310 Highland Avenue and is located at the NE corner of
the mtersection of 13` Street/Sheldon Blvd and Highland Avenue The approximate area of the site designated for
work is 12 acres The site is currently vegetated on the south half and bare dirt with sparse vegetation on the north
half A 6' high chain link fence is installed along the perimeter of the site Ultimately this site wdl become a 9/11
memorial
The work generally consists of clearing, grubbing, demolition, grading, and silt fence mstallation Three bid alternatives
are being considered and are described as follows Each bid scope builds on the previous bid All three proposals should
be filled out and returned
• Bid Alternative #1 is the basic bid for work and includes clearing, grubbing, existmg silt fence removal, new sdt
fence installation, and pavement removal, all inside the fence line
• Bid Alternative #2 includes the work from Bid Alternative #1 plus additional work for fence removal, small
retaming wall removal and clearing/grubbing immediately outside the fence line
• Bid Alternative #3 mcludes the work from Bid Alternative #2 plus the additional work of grading the stockpdes
on-site and hauling the ofF-site stockpile immediately ad�acent to the site onto the site and grading the material
Since there are no detailed plans and specifications, the City will be meeting with each Contractor individually on-site to
explain the scope The 2012 Standard Specifications for Road, Bridge and Mumcipal Construction will apply to the
pro�ect Bids shall be based on the most current Kitsap County Prevailing Wage Rates The lowest bidder wdl be
selected and contract negotiations wdl begm �mmediately The Contractor should be prepared to begin work
immediately after the contract is executed, no later than the first week of October The work shall be completed withm
five (5) working days from the day of mobilization
Please fill out the three (3) attached bid proposals and scan/email them to me at William davis@ci bremerton wa us
You may also fax them to me at (360) 473-5398 The proposals shall be sent no later than 8 00 a m on Tuesday,
September 25 There will be no public bid opening However, the other bids will be kept on file and made available
upon request
The following documents are attached for your use in filling out the bid proposal
1) Bid Proposals for Bid Alternatives #1, #2, and #3 Fill out all three and return to me
2) Site Plan
3) Draft City of Bremerton Public Works Agreement with Prevailing Wage Rates to be used for bidding
If you have any questions, please feel free to call me at (360) 473-2312 or e-mail at the above e-mad address
Sincerely,
�6 � ��
Bdl Davis, P E
B10 PROPOSAL FOR STABILIZING FORMER CHEVRON SITE
NAME Of CONTRACTOR Tl.,�iiT �X CAVATI N fi CL:� � U�t:
PREPARED BY �1)t.� S��cM;� SZ,E., ON SEP �. 2012
BID ALTERNATIVE #3 - BID ALTERNATIVE #2 PLUS GRADING STOCKPILES
City of Bremerton
Sep-12
Item # Descri tion Est. �Q Unit Unit Cost $ Total $
Clear and grub inside fence and within staked limits
1 Includes removing all debris and old sdt fence Do 1 LS
not work stockpdes ( p � � � � °� �j p, � "=
2 Install standard silt fence 750 LF �� �,5 r� 2-- Sa
L J
Demolish pavement pad at entrance (limits to be
3 marked by ownerJ 50 SY �p� �a I �-- ' �,�
Remove existing chain-Imk fence, inciudmg mesh,
4 posts, and concrete bases West fence, starting at 500 LF
r,v
south boundary to mid-way across north baundary �'G� �^1 �� —"
I
Clear and grub outside fence along west fence line �F (measured by
5 between fence and street, �ncluding removing 400
fence line) oc ��
marked utdity poles (up to 3j Do not remove trees �--� +� Ii_ �� �
�
6 Remove 3' high retaming wall (approx 100 LF) along 1 � t„ �.,
west fence �� l�i , � � � � ,
� Grade sod stockpiles into site per Plan and as 1 � � �,
directed by the Owner � ��7 Q`' � ��(j ,""'�
$ Brmg stockpde outside of fence on-site and grade 1 �
er Plan and as direded by Owner �(��"jd ,� 3�}l�C� �
SUBTOTAL � ( -\ I Z � 5il
TAX@86% r � � �Q, ��
�
TOTAL "� a � � `� "��
CITY WILL RAISE APPRQXIMATELY 14 WELL HEADS BEFORE THE PROJECT DO NOT DAMAGE DURING WORK
ALL GRUBBED MATERIAL, FENCING AND DEBRIS SHALL BE HAULED OFF-51TE FOR DISPOSAL
_ _ ___ ---
� �_,,_ __ -- - �
` i i � PORT WASHINGTON NARROWS - - - - - - - - -
� � __--------
�/ i � — — --- -- -- --
/� / � � - -' - � � - �'� � - . __ -- -- -- -- -- -- _ _ _ _ — — — —
/ / \^ L _ - _ — YXNW 9 2 — __ __
/ ' !_ - .,�- ����
����
�/ // \� �'�' /�\�\� - _ _—� � — - ==s�.===_ ---` __ _ \`. _ _
� � /� � �' ��� �� LIMITS OF GRADING �
� � � ` AGAINST BERM
� 1 �; / i LIMITS OF FENCE 1 i
� � REMOVAL WOOD FENCE 4 I
� o �
1 `� � � ❑
� �' ITEM 1 CLEAR AND FF=265
�� �I ' \ � GRUB INSIDE FENCE
I � \ � \ ,I DEBRIS REbtOVAL
� b
WSIING SEIYEH � I
PUGP SfA710N �\� 1 � FUIURE YEYORLLL
' � �' I
� � � ITEM 2 INSTALL SILT FENCE
� ` � ITEM 4 DEMO CHAINLINK
� � FENCE
, � �r
\ �
/ � �, ` ` ITEM 6 DEMO SMALL 7 ITEM 7 GRADE
� RETAINING WALL ON-SITE STOCKPILE S� I
� \I ` � � (APPROX 100 LF)
as �_ � N ` • • J
_' a I \ \ �-�� � _,�
� \ � \� ` 1 1 -� -• ----
1 OS 4 `
� � � ss 8' �M ' � ��' " _ _ __- —=- ' �---�- �
U_ �_, � ITEM 3 DEMOLISH CONCR E' j _,_ e ,� =�.-- """: _ —_ '" �_ a� _ ss—
�PAVEMENT TO LIMITS - - - - "' �`��
rv _DETERMINED BY OW R _ ` �_ � -- -`" °5 0 �_ �� � ` �
oamwc - " - - -- °
Tow� �'p ! - - - _ - "' ����ss� \ ,—_""'' -- - <x y o �, ,, --_" _ -JTEM 5 CL AND GRU�B
� � / " �,,� � , _ ,_ OUTSIDE OF E�NC�
/ �i ss_ � ,sSo ° p e - '_ - -
//, r � � M s - !- ( I� j �
YMXW 92 -� ' i - _ - � � \ � W �_� �"�-� _ "_ "' . _ _ ` s A+�_ ' .,--- ' ' I 3 "i
Q ' 'p�_ - �_�j f J
1 I
I 1 f
/ E y ITEM 8 HAUL OFF-SITE � IX 555 ��������� i
� \�
, � J 3 � STOCKPILE ON-SITE AND � � � ', /
� �/ `�, � c GRADE � � _��
� 7 `
� / ~ fl f � � y � � ` �
/ / �� ��\ � ' ' _ _ ' \�� ���iiiV�
i ` _ v - e �
�/ � 6 CUWERT ' J� / \` / � \ �
IXISfING PMK � ` V /
i / / IXSfINC PAFICMIG
�/, � __-
PREPARED BY s—
WJD �`� r� p�peµl�vOW�ss
�� �P 21, 2011 � . / / �ls �� f