Loading...
HomeMy WebLinkAbout5183Contract Number: Vendor: Sub�ect: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments : r� 0 5183 IMPACT WASHINGTON PSA - Lean Process Improvement DCD LEG 12-1 9/27/2012 0 i � � i � { PROFESSIONAL SERVICES AGREEMENT Bremerton / Impact Washington Lean Process Improvement The Crty of Bremerton ("Crty") and Impact Waslungton ("Consultant"), referred to collectively as the "Parties," enter mto the following Agreement for professional services I. Scope: The Consultant agrees to perform the services more specifically descnbed m the Scope of Work, dated July 20, 2012, mcludmg any attachments thereto, attached hereto as Exhibit A, wluch is mcorporated by reference herein The Scope of Work may be modified only pursuant to Section VII G of this Agreement If the Scope of Work provides for unspecified additional services such services shall only be performed upon the express wntten request of the City Consultant further represents that the services funushed under this Agreement will be performed m accordance with generally accepted professional practices m effect at the time such services are performed II. Term: The Crty and the Consultant agree that work will begm on the tasks descnbed m Exlubrt A immediately upon execution of tlus Agreement The parties agree that the work descnbed m the Scope of Work is to be completed as provided for m the work schedule attached hereto as E�chibrt A, provided however, that additional time shall be granted by the City for excusable delays or extra work as provided for in section IX (A) of this agreement III. Compensation: In consideration of the services provided pursuant to tlus Agreement, the City shall pay Consultant m an amount not to exceed $8,560 Consultant's charges and bills shall conform to the fee schedule attached hereto as page 6 of Exhibit A and incorporated herem by tlus reference The Consultant shall submit regular billmg statements detailing work performed and amount charged on each task or portion thereof The descnptions shall conform to and fall withm the categones set out m the Scope of Work and/or Fee Schedule Upon receipt of a conformmg billmg statement, the City shall promptly process payment PROVIDED, HOWEVER, the City reserves the nght to pnontize scoped work and accelerate andlor delay work tasks under the time frame set forth in Section II herein The Consultant's labor rates and billmg fees shall be as delmeated on page 5 of Exhibit A Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement Consultant shall only be compensated for addrtional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be m accordance with page 5 of Exlubrt A If a billmg statement does not conform to tlus Agreement, the Crty may wrthhold payment until the statement is brought mto compliance Such withholding does not relieve Consultant of its obligations under tlus Agreement Bremerton/Impact Washington Lean Process Improvement Page 1 of 6 IV. Relationship of Parties: Consultant represents that it is slalled m the matters addressed m the Scope of Work and is performing mdependent functions and responsibilities within its field of expertise Consultant and its personnel are mdependent Consultants and not employees of the City Consultant and its personnel have no authonty to bind the Crty or to control the City's employees and other Consultants None of the benefits provided by the City to its employees, mcluding, but not limited to, compensation, msurance, and unemployment msurance are available from the Crty to the employees, agents, representatives, or sub-Consultants of the Consultant Consultant will be solely and entirely responsible for its acts and for the acts of Consultant's agents, employees, representatives and sub-Consultants dunng the performance of this Agreement The City may, dunng the term of this Agreement, engage other mdependent Consultants to perform the same or similar work As an independent Consultant, Consultant is responsible for its own management The City's admmistration and enforcement of tlus Agreement shall not be deemed an exercise of managenal control over Consultant or rts personnel As an mdependent Consultant, Consultant is responsible for payment of all taxes and licensmg fees necessary to perform its obligations under tlus Agreement These taxes and fees mclude but are not limrted to State mdustnal msurance, Busmess & Occupation, State professional licensmg, and Crty busmess licensmg If any taxes or fees due the City have been declared delmquent, the Crty may withhold the delmquent amount, plus any addrtional charges ansmg from the delmquency, from any payments due Consultant V. Indemnification: Consultant shall defend, mdemrufy and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, in�uries, damages, losses or suits, mcludmg all legal costs and attorney fees, ansing out of or m connection with the performance of this Agreement, except for that portion of the m�uries and damages caused by the Crty's sole negligence. The City's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of mdemrufication Should a court of competent �unsdiction determine that this Agreement is sub�ect to RCW 4 24 115, then, in the event of liability for damages arismg out of bodily mJury to persons or damages to property caused by or resultmg from the concurrent negligence of the Consultant and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER The provisions of this section shall survive the expiration or termmation of this Agreement Bremerton/Impact Washington Lean Process Improvement Page 2 of 6 VI. Insurance: The Consultant shall procure and mamtam for the duration of the Agreement, msurance agamst claims for m�uries to persons or damage to property which may anse from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees, sub-consultants or sub-Consultants Before beginrung work on the pro�ect descnbed in this Agreement, the Consultant shall provide a Certificate of Insurance evidencmg 1. Automobile Liabilitv msurance wrth limits no less than $1,000,000 combmed single limit per accident for bodily mJury and property damage, and 2. Commercial General Liabilitv msurance written on an occurrence basis with limits no less than $1,000,000 combmed smgle limit per occurrence and general aggregate for personal in�ury, bodily m�ury and property damage Coverage shall mclude but not be � limited to blanket contractual, products/completed operations/broad form property damage, explosion, collapse and underground (XCU) if applicable, and employer's habilrty, and 3. Excess Liabilitv msurance with limits not less than 1,000,000 limit per occurrence and aggregate 4. Professional Liabilitv msurance wrth limrts no less than $1,000,000 limit per occurrence/claim Any payment of deductible or self msured retention shall be the sole responsibility of the Consultant All required policies shall be provided on an"occurrence" basis except professional liability msurance (if required), wluch may be provided on a"claims-made" basis The Crty shall be named as an addrtional msured on the Commercial General Liability msurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the City, which names the City as an additional msured shall be attached to the Certificate of Insurance The Crty reserves the nght to receive a certified copy of all the required msurance policies and endorsements The City further reserves the nght to re�ect any unacceptable policies and/or endorsements The Consultant's Commercial General Liability msurance shall contam a clause statmg that coverage shall apply separately to each msured against whom claim is made or surt is brought, except wrth respects to the limrts of the msurer's liability The Consultant's msurance shall be pnmary msurance as respects the City and it shall be an affirmative obligation upon Consultant to advise the Crty's Risk Manager by fax at (360) 473- 5161, or by certified mail, return receipt requested to City of Bremerton, attn Risk Management, 345 6`" Street, Suite 600, Bremerton, WA 98337 witlun two days of the cancellation, suspension or substantive change of any msurance policy set out herem, and failure to do so shall be construed to be a breach of this Agreement. Bremerton/Impact Wastungton Lean Process Improvement Page 3 of 6 The Crty also reserves its unqualified nght to require at any time and for any reason, proof of coverage m the form of a duplicate of the insurance policy with all endorsements as evidence of coverage VII. General Conditions: A Reports and Information When requested by the City, Consultant shall furmsh penodic reports and documents on matters covered by this Agreement The reports and documents shall be furnished m the time and form requested Consultant shall mamtam accountmg records m accordance with Generally Accepted Accountmg Pnnciples (GAAP) to substantiate all billed amounts B Ownership and Use of Records and Documents Ongmal documents, drawmgs, designs and reports, mcludmg those in electromc format, developed under this Agreement are the property of the City. All wntten mformation submitted by the City to the Consultant m connection wrth the services performed by the Consultant under tlus Agreement will be safeguarded by the Consultant to at least the same extent as the Consultant safeguards like information relaring to its own busmess If such mformation is publicly available or is already in Consultant's possession or known to it, or is nghtfully obtamed by the Consultant from third parties, Consultant shall bear no responsibility for its disclosure, madvertent or otherwise All data, documents and files created by Consultant under tlus Agreement may be stored at Consultant's office m Shelton and Mukilteo, Washmgton Consultant shall make such data, documents, and files available to the Crty upon its request at all reasonable times for the purpose of editmg, modifymg and updatmg as necessary until such time as the City is capable of storing such mformation m the City's offices Duplicate copies of this mformation shall be provided to the City upon its request, and at reasonable cost All documents, includmg all reports, drawmgs, specifications, computer software or other rtems prepared or furmshed by Consultant pursuant to this Agreement, are mstruments of service wrth respect to the pro�ect and are the property of the City Any reuse by the City for other than the specific purpose mtended will be at City's sole nsk C Work Performed at Consultant's Risk Consultant shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and sub-consultants m the performance of the work hereunder and shall utilize all protection necessary for that purpose All work shall be done at Consultant's own nsk, and Consultant shall be responsible for any loss of or damage to matenals, tools, or other articles used or held for use m connection wrth the work D Place of Work• The Consultant shall perform the work authorized under this Agreement at its offices in Shelton and Mukilteo, Washmgton Meetmgs wrth the City staff as descnbed m Exh�bit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties Bremerton/Impact Waslungton Lean Process Improvement Page 4 of 6 E Entire Agreement This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth m the text of tlus Agreement F Severabilitv Should any part of this Agreement be found void, the balance of the Agreement shall remam in full force and effect G Modification This Agreement may only be modified by wntten mstrument signed by both Parties H Wntten Notices All commumcations regardmg tlus Agreement shall be sent to the parties at the addresses listed below by registered or 1 st class mail, or by personal service, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writmg Crtv Address Heather Kauer 345 6�' St , Surte 600 Bremerton, WA 98337 Consultant Address Roger Milliman PO Box 2117 Shelton, WA 98584 I Waiver Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision Waiver of any nght or power arismg out of this Agreement shall not be deemed waiver of any other nght or power J Non-Waiver of Breach The failure of the City to msist upon stnct performance of any of the covenants and agreements contamed herem, or to exercise any option herem conferred m one or more mstances shall not be construed to be a waiver or relmquishment of said covenants, agreements or options, and the same shall be and remam m full force and effect K Cornpliance with Laws Consultant shall comply wrth all applicable Federal, State, and local laws m performmg its obligations under this Agreement L Choice of Law and Venue This Agreement shall be mterpreted according to the laws of the State of Washmgton Any Judicial action to resolve disputes ansmg out of this Agreement shall be brought m Kitsap County Supenor Court M Attornevs' Fees In the event of litigation to enforce any of the terms or provisions herein, each party shall pay all its own costs and attorney's fees N Assi�nment Any assignment of this agreement by the Contractor without the wntten consent of the Crty shall be void VIII. Nondiscrimination: Consultant shall not discnmmate m employment or services to the public on the basis of race, color, national origm, sex, religion, age, mantal status, disability, or sexual orientarion except for employment actions based on bona fide occupational qualification Bremerton/Impact Washmgton Lean Process Improvement Page 5 of 6 IX. Termination: This Agreement shall remam m force unhl completion and acceptance of the services, terminated by wntten mstrument upon mutual consent, or by the City of Bremerton for convemence This Agreement may be immediately terminated for cause by a Party if the other Party substantially fails to perform through no fault of the termmatmg Party, and the non- performing Party does not commence correction of the failure of performance wrthm thirty (30) days of the termmatmg Party's sendmg notice to the non-performing Party Any Notice by Consultant shall mclude a report showmg the status of all items listed m the Scope of Work current through the termmation date If the City receives reimbursement by any federal, state, or other source for work descnbed m Section I herem, and that fundmg is withdrawn, reduced or limited in any way, or the pro�ect is cancelled or substantially reduced after the execution date of tlus Agreement and pnor to the completion of the work, the City may summanly termmate this Agreement A Excusable Delavs The nght of Consultant to proceed shall not be termmated nor shall Consultant be charged wrth liquidated damages for any delays m the completion of the work due to 1) any acts of the federal government m controllmg, restrictmg, or requisitiomng matenals, equipment, tools, or labor by reason of war, national defense, or other national emergency, 2) any acts of the Crty, its consultants, or other public agencies causmg such delay, and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and wrthout the fault or negligence of the Consultant, mcludmg, but not restncted to, acts of God, fires, floods, stnkes, or weather of unusual seventy PROVIDED, HOWEVER, that the Consultant must promptly notify the Crty wrthin ten (10) calendar days m wrrtmg of the cause of the delay If, on the basis of the facts and the terms of tlus Agreement, the delay is properly excusable, the City shall, in wrrtmg, extend the tune for completmg the work for a penod of time commensurate with the penod of excusable delay B Rights Unon Termmation In the event of terminahon, the Crty shall pay for all services performed by the Consultant to the effective date of termination, as descnbed on a final mvoice submitted to the City After termination, the Crty may take possession of all records and data withm the Consultant's possession pertammg to this pro�ect which may be used by the City without restriction Any such use not related to the pro�ect which Consultant was contracted to perform shall be without liability or legal exposure to the Consultant CITY OF BREMERTON � L ` By r its �'Yt A, S!D� Date 9 —Z7 —1Y CO SULTANT ! , -� � .�G-� By o� ,� . , ; /� rts d'eG � Date �S, d /Z Approved as to form n� Bremerton C y Attorney t . City Clerk Bremerton/Impact Washington Lean Process Improvement Page 6 of 6 � • Prepared for the City of Bremerton Lean Process Im provement Kaizen Graffiti Abatement � Prepared by � , Y�, ,--�- ; � � - � � � � � � ---�� � � k p , � •i �. � � $ • � / UBI No 601-72-3974 7-20-2012 Roger Milliman, Project Manager Impact Washington - A NIST-MEP A�liate Phone: (360) 589-3790 E-Niail: nr�illimanC�impactwashirraton.ora Contenfs Impact Washington Background and Qualifications Value Stream Mappmg (VSM) & Lean Impiementation (Kaizen) Traming Proposal Quote for Services Overall Approach to Services — Qualifications and Capabilities Lean Training Capabilities Lean Mentoring and Coaching Strategic Lean Deployment Record of Past PerFormance - Representat�ve Pro�ects Resumes - Staff and Partner Qualifications page 2 page 4 page 6 page 7 page 11 page 12 page 14 page 18 page 25 Page 1 IMPACT WASHINGTON Background and Qualifications No matter whether an orgarnzation delivers products or services or both, the LEAN Improvement phdosophy and methodology have the potential to transform the orgarnzation and the way it accomplishes its goais IMPACT WASHINGTON has developed and implemented LEAN transformation pro�ects across muitiple orgarnzations, often spanrnng multiple years with indiwdual orgarnzations This experience coupled with an accountabdity model creates long term sustamable results for clients IMPACT WASHINGTON has the talent, experience and track record of not only implementmg LEAN, but transformmg orgarnzations in the process In each of the past three years, IMPACT WASHINGTON has completed over 50 Lean Enterprise pro�ects in different sizes, shapes and forms A typical pro�ect includes Lean training, Lean Event Faalitation in the form of Value Stream Mapping and AIW events, Lean Coachmg and Mentoring (both formally in terms of training and scheduled events, and Strategy Deployment, in terms of pro�ect management and formal trairnng and mentoring on Lean Strategy Deployment IMPACT WASHINGTON �s an affiliate of the Manufactunng Extension Partnership (MEP) MEP centers nationwide employ nearly 1600 specialists who provide direct assistance to orgarnzations throughout the Urnted States MEP supports 59 centers in 392 locations and can be found in every state and Puerto Rico These centers provide client companies with an array of services that focus on growth, productivity, efficiency and sustamabdity As the Washington State center for the federal Manufacturing Extens�on Partnership program, IMPACT WASHINGTON operates as a non-profit organization that provides fee-for-service consulting with deep expertise in LEAN traming and consultmg IMPACT WASHINGTON has delivered services to over 1200 companies since 1997, as well as government orgarnzations like WA State Department of Commerce, City of Spokane, Spokane Commurnty Colleges and Kitsap County DCD We believe that implementing lean contmuous process improvements is critical to successfully operatmg competitive and excellent orgarnzations in the 21� Century Headquartered m Mukdteo, Washington, IMPACT WASHINGTON is a team of 15 people, including six pro�ect managers who average more than 25 years experience, deployed throughout the state The organization utdizes a nefinrork of both mternal and external consultants with decades of experience and success in LEAN deployment The consultants include those who have been mentored by Shingqutsu (Toyota consultants), led study missions to Japan, and have held senior leadership positions in Fortune 100 companies The N15 f7M�P system uses an indepenaent survey tirm to measure the economic business impacts of the MEP consultant services at each participating organization and requires that all MEP pro�ects be evaluated 6-12 months after a pro�ect closes, quantifymg pro�ect economic impacts m terms of increased or retamed sales, cost savings, �obs created or retained, and investment in trairnng, technology and equipment Evaluation is a key element of all NIST MEP programs and activities Results are used to assess the effectiveness of services and their impact on the perFormance of client firms, and to help guide planning at both the center and network levels By measunng short- and long-term impacts, NIST MEP can assess economic retums on the federal investment m manufactunng extension services Many studies are finding that small manufacturers who work with their local NIST MEP center show dramatic im rovements "Systemat�c evaluat►on stud►es have confirmed that the MEP ►s having a positive effect on businesses and the economy has achieved national coverage and establ►shed local service partnerships and most �mportant MEP serwces are leadmg to desired bus►ness and econom�c goals " Philip Shapira, Ph.D., Georgia Tech University P (Source www mea rnst Qov) Page 2 During the last five years, IMPACT WASHINGTON survey results show that their projects w�th over 1000 companies have resulted in $28 million in client cost savings and $73 million in client sa/es increases. IMPACT WASHINGTON utdizes a proven approach to determine the best path for each client, and has an assortment of curricula to draw upon for any type of pro�ect The organization has developed and implemented specialized Lean Programs for the food, wood products, electrorncs, aerospace, and healthcare mdustnes, as well as for govemment entities mcluding the Department of Commerce, the City of Spokane, Spokane Commurnty Colleges and Kitsap County DCD And we additionally completed a 3-day AIW with the King County restaurant permit section (Oct 26- 28, 2011) under the umbrella of a larger Lean pro�ect with WA Sate Dept of Commerce For each of these industries, unique LEAN curnculum and a simulation were developed that included trainmg in LEAN fundamentals (LEAN 101), 5S, Value Stream Mapping, LEAN workforce traming, train the trainer, cultural awareness and change management Page 3 LEAN PROJECT WORKFLOW Step Activity Objective Who 1 Sponsor meeting Clanfy the busmess Sponsor, consultant, intent�on team leader 2 Develop charter for Value Document the workshop Team leader, Stream Mapping (VSM) ob�ectives consultant, sponsor (optional) 3 Sponsor approval of Sanction the workshop Sponsor, team leader, charter consultant 4 Data collection and Collect data using Team leader, team planrnng standard and custom members, with guidance Lean tools and from consultant techniques 5 Conduct Kaizen Achieve the ob�ectwes Team leader, team, workshop outlined m the Kaizen consultant, sponsor at charter kick-off and report-out meetings 6 Implement and sustam Implement the Sponsor, team leader, the gains improvements, track team, with guidance progress and remove from consultant obstacles Page 4 LEAN OFFICE KAIZEN WORKSHOP A Lean Office Kaizen Workshop is a rapid process-improvement workshop designed to achieve dramatic results The workshop team analyzes and designs the flow of materials and information required to bnng a product or service to a consumer The workshop includes �ust-in-time training, impiementation, and transformation of a selected area This workshop wdl require a cross- functional team for optimum performance The team is comprised of those who work in the selected area, as well as from other areas that might be impacted by implemented changes The participants should be devoted to the team for the entire duration of the workshop The schedule, below, dlustrates a typicai five-day workshop Theme Activity MON DAY Kick-off lean introduction - history, broad def. Train and VA/NVA - "Time" video map process "Who's the customer?" discussion Office wastes Flow charting Map the process PART 1 TUESDAY Map the process PART 2 Map and �dentify the waste identify 4uantify wastes per Project Goals waste Establish targets Prioritize, discuss, and group wastes Multi-voting WEDNESDAY Form teams Establish teams and communication process to analyze Analyze wastes - the 5 Why's Develop 5 ideas waste Try-storm ideas PART 1 THURSDAY Test Try-storm ideas PART 2 solutions Simulate the new system Develop measures and document changes FRIDAY Document Make adjustments / I.D. future opportunities and report Prep for final report-out out Final report-out Daily schedule: Mon - Thurs 9:00 to 4:00; Fri 9:00 to 2:30 Breaks: approximately 10:30 and 2:30 lunch: approximately 12:00 Page 5 Quote for Impact Washington Services For our Lean Process Improvement Kaizen's, Impact Washington provides Training and Consulting services at a flat dady rate of $1,500 corresponding to an hourly rate of $187 50 We charge a one-half day for preparation including �oint meetmgs, conferences and planning Travel costs are a direct pass through Our selected resource provider Carlos Venegas wdl commute daily via ferry and driving from the SeaTac area Our standard dnvmg pass through is the government rate $0 55/mde This proposal @5 training days @$1,500 per day One- half day preparation Estimated travel expense pass through Total $7,500 $ 750 $ 310 $8,560 Page 6 Overall Approach to Services - Sustainable LEAN Enterprise Deployment Overall Approach to Serv�ces - Susta�nable LEAN Enterpnse Dep/oyment Impact Washington believes that a successful Lean Enterpnse Transformat�on depends on four key factors • The need for change / improvement • top management support • workforce /communication and mvolvement • clear improvement incentive for the workforce and management We use selected teams of Project Managers, Trainers and Consultants to approach each engagement, not indiv�dual consu/tants, thus optimizing our capa6ilities to address each of the above key factors. A sustainable LEAN Enterpnse requires a systematic and relentless pursuit of eliminatmg wastes at all levels of the organization Whde there is no deployment recipe, there is a roadmap. A recipe telis you exactly how to do somethmg — the amounts, sequence and timmg There is no such recipe for LEAN success since every orgarnzation starts with a different set of ingredients (or factors and constraints) However, there are guideposts along the way that help you determine where you are and identify potential solutions to help you get to where you want to go The extent and degree of support needed should be a function of the current state of an orgarnzation's operations, the potential optimum state, and the level of expertise currently residmg at the organizat�on that can be leveraged to close the gap Every LEAN Enterpnse strategic mitiative has common characterist�cs including • Creation of the leadership, culture and infrastructure to align the management system and develop the organizational culture necessary to implement worid-class practices and performance • Integration of strategies and systems to focus the core operations and practices to achieve world-class results, focusmg on the needs of the customer • Integration of support functions to apply improvement techrnques and strategies within the value stream • Achievement of quality, cost, productivity, space, and delivery improvements, and establishmg measures that evaluate the outputs of the core business system as well as overall performance of world-class practices • Exploiting operational improvements to achieve overall customer satisfacbon, profitabdity measures, and other desired busmess results • Leading and sustairnng operat�onal improvements by trairnng and deploying internal Lean champion expertise so that the Lean phdosophy and pnnciples wdl be maintained and furthered Our expenence shows that Lean is a great fit for Government, since it defines Value from customers' perspective, whde being based on stable standardized processes, guaranteeing customer sat�sfaction and first pass quality Lean is based on the foilowing • Identify your Value Stream - Value vs Waste • Workplace Organization – 5S, Visual Controls • Make Value Fiow Continuously based on the Pull of the Customer • Prevent Waste – Mistake Proofing • Standardize the Process • Contmually Morntor, Control and Improve – Lean Metrics Page 7 Tools ' Cuftur� V�61��a6c��0 �gfi�4c�sa� �, �� � x � s, Covarnance t�lanagemer�t 5yst�ess Figure '! — Sustainable LEAN Enterprise Model An optimal LEAN system is dlustrated in Figure 1 This system is a set of mterrelated, interdependent parts that must work together to accomplish a goal or ob�ective A LEAN initiative, therefore, should stem from a defined business need or ob�ective Whde LEAN can be effective at an isolated process level, sustainabie gains are made when LEAN is implemented as a system LEAN Deployment in Service Industries The mission of IMPACT WASHINGTON has focused on mcreasing the competitiveness of the Washington State industnal base In accomplishing th�s task, LEAN training, LEAN event faalitation, LEAN mentoring and coaching and Strategic Planning for LEAN deployment have been parts of the roadmap for achieving bottom-line results in profitabdity and efficiency These improvement events occur all along the Value Stream of an organization, includmg m the admirnstrative processes In the past 5 years, IMPACT WASHINGTON has �ncreasingly applied our expertise to non-industriai clients' needs These client arenas have included government entities, healthcare providers, non-profits and educational institutions LEAN prmcipies and tools apply to every orgarnzation, and especially with economic pressure on public entities to do more with less, these orgarnzations have been ripe for understand�ng the benefits of deploying LEAN Every organization attempts to satisfy customers with products and services, and how that is accomplished is the "production system " LEAN is the methodology to improve the capacity of the output and mcrease customer satisfaction Government entities are increasingly eager to gain expertise m deploying LEAN In response to this mterest, IMPACT WASHINGTON has customized LEAN trairnng and events for service industry providers Page 8 Whde the process for conducting these events is the same for the office as it is for the factory floor, one of the key d�fferences encountered in the office versus the factory is that waste is more difficult to see Waste takes on a different form in the office, therefore Toyota's '7 Traditional Wastes' require further defirntion as how they apply to the office IMPACT WASHINGTON has taken this into consideration and incorporated this process into trairnng for LEAN office events Four Types of Office Waste 1 Informat�on waste 2 Process waste 3 Waste in fhe phys�cal env►ronment 4 People Waste (► e , ineffic►encies in how people work) Over the last five years, IMPACT WASHINGTON has conducted over one hundred LEAN office events with over eighty-five companies and organizations This mcludes the City of Bellmgham permitting department, Moss Adams, Boemg, and Trans Ocean Products, as well at as numerous public events statewide IMPACT WASHINGTON launched a public/private 8 hour LEAN office class entitled �ce Smart m 2005 Since the continuous improvement process is a part of the way IMPACT WASHINGTON operates, this can be seen in our training programs as well Listening to the customer, traming has been revised multiple times to incorporate the learning that applies to the service and government orgarnzations and to continually improve the classroom experience for tramees In IMPACT WASHINGTON's latest iteration of LEAN office, computers are now part of the simulation trairnng to more realistically reflect the office environment of today Elemenfs of a typical Lean Enterprise Transformation Project IMPACT WASHINGTON APPROACH LEAN pro�ects have a standard implementation methodology that is outlined in all pro�ect proposals and followed in all" pro�ect executions IMPACT WASHINGTON has adopted the LEAN Six Sigma DMAIC (enhanced PDCA) pro�ect execution process as its standard pro�ect implementation methodology and is exptained below Step 1 Define (conduct interviews) The purpose of defining is to clarify the goals and refine understandmg of the potential value of the pro�ect, check resources requtred, develop a formal pro�ect implementation plan, and define current state processes Activities included in this step range from pro�ect kick-off meetings to value stream and process mappmg to current state layouts Also mcluded are a review of the NIST pro�ect evaluation standards and defining the important pro�ect success metncs In order to better understand the needs of the orgarnzation, an assessment and interview process would be conducted Operational mefficiencies have been identified as a strategic challenge domg busmess, therefore validation and alignment of the ob�ectives and goals of the orgarnzation would be an important outcome of the process The diagnostic framework is an overview of the process by which an orgarnzation moves from cultures of workplace accepting of the status quo, to new cultures of mdependence and LEAN enterpnse in every one of its busmess funcfions It begins with a set of cnteria for�udging the development of resources, capabdities, or other assets that have been identified as important, and is vitai mput to perforrn Hoshin Planning/Policy Deployment It highlights company progress in developing the many mtemal capabdities reqwred to become a LEAN enterpnse across areas of the orgarnzation including Page 9 • Business Operafing System • Financial and Account�ng System • Human Resource System • Info�nation System • Quality System Step 2 Measure -(Assessment and Value Stream Planning) The purpose of ineasurmg is to gather data that describes the nature and extent of the problem In other words, a clear understanding of process perFormance compared to process requirements is determmed Activities included in this step range from basic data collection to using data to calculate baselme process pertormance measures such as process cycle times, process cycle effiaencies, and process capabdity Measures gathered should relate back to those identified as important by the customer in the define stage Step 3 a ze :-(Value Stream Mapping) The goal of analysis is to make sense of all the previously collected mformation and to track down the cause and effect relationship to reduce the non-value added activities Included are ail analysis activities These can vary greatly depending on the nature and type of pro�ect, and is the mput to the improve step Step 4 Imnrove/Implement: -(Accelerated Improvement Workshops) Improvement defines what specific changes need to be made in the process to counteract the causes and what methods wdl achieve the desired effects Specifically designed countermeasures to improve the process wdl be identified, agreed upon, and implemented Step 5 Co_ ntrol -(A3 Management) The purpose of control is to make sure that the gains made wdl be sustamed until and unless new knowledge and data show that there is an even better way to operate the process In LEAN pro�ects, controls are often visual in nature but may mclude other means/methods to ensure sustamabdity of improvements Outcome Evaluation At the conciusion of each stage of an intervention and at proJect end, IMPACT WASHINGTON conducts both an informal and formal outcome evaluation m which results are quantified and next steps are outlined Internal Lean Champion Training Because it is cruciai to sustaining Lean efforts over time, IMPACT WASHINGTON stnves to train intemal Lean Champions to continue the Lean �ourney IMPACT WASHINGTON provides a formal trairnng program, The Lean Enterprise Certificate Program (LECP), which leads to SME Bronze Certification, as one avenue for achieving internal champion expertise *Pinpoint Solutions It must also be said that IMPACT WASHINGTON listens to clients' needs and requests and will provide requested services m a targeted solution mode as appropnate Whde it may not be part of a prefeRed comprehensive Lean Enterprise Transformat�on model, providing elements of LEAN trairnng such as LEAN 101 or 5S may be a necessary step for an organization to proceed with contmuous improvement efforts IMPACT WASH/NGTON is a full service provider of LEAN Enterprise services. In addition to the typical Lean Programs, we have included Innovation Engineering, which the Washington StatevDepartment of Commerce is currently conducting, and Green Enterprise Certification Program. Page 10 Lean Training Curriculum Development and Le�n Overview Training: IMPACT WASHINGTON staff and partners have designed and/or customized Lean Traming Courses and Workshops that are ready to deliver, or can be customized to reflect the specific needs of the King Counry audience, includmg • Basics of Lean / Lean Overview Training • Customized Lean 101 Training for Manufacturing with Live Simulation - wood products, electrorncs, and food processing industry Also avadable in Sparnsh • Office Lean101 Traming with Live Simulation • 5S (Workplace Orgarnzat�on) • Value Stream Mapping, mcluding Admirnstrative Value Stream Mapping • Trairnng Within Industry (TWI) • Lean Enterpnse Certificate Program • Green Enterpnse Certificate Program IMPACT WASHINGTON staff and partners have the skdls and background to devetop or adapt traming programs for, or m collaboration with, employees Most programs can be delivered in a classroom settmg, as well as in a trairnng and implementation package More importantly, IMPACT WASHINGTON's tra�rnng programs give a foundationai trainmg in various Lean tools Lean Overview Traming • Basics of Lean • Lean 101 with Live Simulation • Office Lean 101 • 5S Workplace Organrzat�on Facilitator Training • Lean Leadership • Front Line Leadership • Lean Enterpnse Champion Program � T1NI Job Instructions, Job Methods, Job Relations • Green Enterprise Champion Program Team Leader Training • TWI Job Relations • TVUI Job Methods, Job Instruction Team Member Training • Lean 101 and other content training such as 5S • TVNI Job Instructions, Job Methods Leading a Lean Team for Manager Training • Management Overview • Front Line Leadership Lead�ng a Lean Organization for Executive Training • Strategy Deployment • Management Overview Page 11 Lean Mentoring and Coaching Leadership is key to initiating and owning the Lean Transformation process The five roles in a Lean organizational structure include Leadership, Value Stream Management, Lean Coach/Experts, Front-Line Management (Supervisors 8� Leads), and Frontline Workforce IMPACT WASHINGTON, in the course of nearly all of their pro�ects, performs the function of Lean Mentoring and Coachmg In both the traming and event facditation/consultant functions, we strive to include advice and training to help an organization perform in each of these categories 1) Lean Leadership 8� Management — Develops leadership to understand Lean as a strategic initiative, implement proper structure and management systems, and develop the orgarnzation In addition, leadership directs plans, manages and controls implementation, and estabiishes support systems (budgeting, commurncations and promotion, perFormance measures, recognition and rewards, etc ) to ensure a culture of contmuous improvement 2) Value Stream Managers — Most organizations are structured into functional 'sdos' creat�ng gaps, delays, rework, poor coordination, etc , and generally disrupting product flow Value Stream Managers oversee the overall value creation process, plan and manage the integration of the system using Lean strategies, link value stream ob�ectives with business ob�ectives, and report progress to the top site manager 3) Supervisors — Typically the most neglected role m the Lean transformation process, iMPACT WASHINGTON's model stresses the important role of Supervisors A Supervisor is defined as anyone who directs the work of others which mcludes shift leads, technical roles such as regulatory, safety and quality coordmators Supervisors are instrumental in transformmg the culture as they are m the best position to mfluence dady behaviors 4) Workforc� Lean is about budding a culture of continuous improvement Workforce practices are activities that allow each worker to contribute to improvements outside of structured events These practices mclude Job Safety, Job Methods Improvement, Job Instruction, Job Relations, 5S/Workplace Organization, and Basic Problem Solving 5) Lean Coach/Expert —Key pomt people are identified to leam Lean Six Sigma processes, tools, and techniques, and are an essential role in the Lean �ourney The aim is to equip them with the expertise to be a resource for executing protracted pro�ects and team-based rapid improvement events In addition, whde Lean mentoring and coaching is embedded in every IMPACT WASHINGTON pro�ect, we can also provide these resources in a more formalized approach for key managers and employees Method The Leadership and Executive Management Team receive orientation m a vanety of topics that may include Lean Leadership, Leadership Job Relations, Lean Management Systems Page 12 Deployment, Leadership Problem Solving, A3 Management, and Strategy Deployment This can mclude the following ob�ectives, but is not limited to Lean Leadership — The Leadership Team must understand basic concepts, terminology and defirntions In addition, the teams must understand how Lean is different than `traditional' improvement and management methods, mcludmg how Lean improves organizational performance This orientation wdl provide Lean Leadership with an overview of Lean and focus the leadership on what their role wdl need to be in a successful Lean Transformation It is by no means sufficient to prepare them to lead such a transformation To do this, some or all of the Leadership Team should contmue trainmg Leadership Team Training Leadership Job Relations -JR emphasizes that people must be treated as individuals Supervisors are given foundations for developmg and maintainmg good relat�ons to prevent probiems from arising Principles mclude providmg constructive feedback, giving credit when due, telling people in advance about changes that wdl affect them, makmg the best use of each person's abdity, and earrnng the employee's loyalty and cooperation When problems do arise, it teaches supervisors how to get the facts, weigh them, make the decision, take action, and check results Lean Management Systems Deployment — The lean management system provides a 4 step method actively monitonng improvement processes and mentoring for developing people It includes establishing Leader Standard Work, Visuai Management Boards, Dady Accountabdity Process, and Sustam Model Each of the steps is actionable and requires on-going management routines and mteraction Leadership Problem Solving — Whether at the management level of front-line, understanding the thinkmg process for systematically solving problems is at the heart of a lean operating system Using DMAIC (Define, Measure, Analyze, Improve, Control) as a framework, specific actions and related tools are used to fulfili each of the five steps of problem solving A3 Management — A3 (in the lean context) is about a method for process improvement which is very simdar to the Demin4 imqrovement cvcle It is a standardized report developed as part of the Toyota Production System The A3 name is from the paper size (approximately 11" x 17") The report is written and drawn (diustrations are encouraged) on one piece of paper The report should include something simdar to (it can vary), 1) Overview and current state, 2) Root cause analysis, 3) Proposed countermeasures, 4) Implementation plan, 5) Results, and 6) Future plans Lean Mentoring and Coaching contnbutes to a better understanding how to lead and manage the Lean Transformation process, and how to communicate effectively and manage change while establishing the foundation of sustainability Page 73 Strafegic Lean Deployment An optimal Lean system is a set of mterrelated, interdependent parts that must work together to accomplish an ob�ective or goai These systems mvolve the management and human social systems of the orgarnzation (see figure 1, page 5) How these systems mteract and are dependent upon each other, are based upon the design and support of the leadership team Therefore leadership is key to initiatmg and owrnng the Lean Transformation process Our consultants provide the leadership with support for Strategic Lean Depioyment in both formal and informal ways A Successful Lean Deployment needs • Ciear Vision, Needs and Priorities • Alignment with Strategic Plan, Busmess Goais and Targets • Strong Executive and Management Support and Sponsorship • Active Employee Participation • Leaders / Lean Champions • Trairnng and Education for all Employees • Commurncation and Follow up Plan Formally, IMPACT WASHINGTON leads many organizations through Vision and Mission Development, Strategic Planning/ Strategy Deployment and Hoshm Planning In addition, to follow through with facditated learrnng on Strategy Deployment and Hoshin Planning, IMPACT WASHINGTON can provide ongoing support throughout the pro�ect Elements of Strategic Lean Deployment where IMPACT WASHINGTON helps lead Lean Management Systems Deployment — The lean management system provides a 4 step method actively morntormg improvement processes and mentoring for developing peopie It mcludes establishmg Leader Standard Work, Visual Management Boards, Dady Accountabdity Process, and Sustain Model Each of the steps is actionable and requires on-going management routines and interaction Leadership Problem Solvmg — Whether at the management level of front-line, understanding the thinking process for systematically solving probiems is at the heart of a lean operating system Using DMAIC (Define, Measure, Analyze, Improve, Control) as a framework, specific actions and related tools are used to fulfill each of the five steps of problem solving A3 Management — A3 (in the lean context) is about a method for process improvement which is very simdar to the Demmg improvement cvcle It is a standardized report developed as part of the Toyota Production System The A3 name is from the paper size (approximately 11" x 17") The report is written and drawn (illustrations are encouraged) on one piece of paper The report should include something simdar to (it can vary), 1) Overview and current state, 2) Root cause analysis, 3) Proposed countermeasures, 4) Implementation plan, 5) Results, and 5)Future plans Strategy Deployment — Strategy depioyment is cntical for alignmg speafic improvement actions with organizational level goals and obJectives The plan generated by the Strategy Deployment process is hierarchical in nature, with the corporate ob�ectives determirnng the corporate strategies which, in tum, are supported by lower-level strategies that cascade down the organization In effect, the goals of every mdiv�dual should support the goals of the next person up m the hierarchy Every strategy further consists of tactics or act�ons that need to be undertaken Page 14 to accomplish the strategy In this manner employees and health care providers may understand how irntial decisions impact (delay) later stages of claim management and add cost Methodology Development and Deployment We use six elements of a complete Strategic Policy Deployment � The Business Fundamental Plan documents daily work Based on the organization's mission, it describes what the business is • The Long Range Plan documents who the organization expects to operate m the future Based on the orgarnzation's vision, it descnbes what the busmess should be • The Annual Plan documents the key ob�ectives that must be accomplished this year m order for the orgarnzat�on to move along the path toward achieving its long range plan and visions � Review Tables compare actual results to expected results and documents changes to the plan Review Tables ailow the plan to become a living document • Abnormality tables document out of ordinary occurrences and facditates problems for root cause removal • The right Lean Enterprise tools are used for the right application - Busmess Fundamental Tools (dady management) and Breakthrough Plans (change management) We use Infrastructure with the Office of Continuous Improvement, Lean Champions, Facditators, Trainers, and Coordinators throughout all level of the orgarnzation Hoshm Strategic Policy Deployment, Goai Deployment Trees, Value Stream Mapping, Visual Controls, 5S Workplace Orgarnzation, Employee Involvement, Standard Work are the baselme instailations More advance tools includes Pull/Kanban Systems, Point of Use Storage (POUS), Problem Solving tools, 5Why's, Cause and Effect Diagrams, DMAIC, Totai Product�ve Mamtenance (TPM) Facd�ty layouts Lean Enterprise Deployment Hoshin Kan�i Breakthrough Goals: • Fill Rate - 83% ,�� � Step Functlon •TAT - 7 �� � �en� •rre� Improvement �� cR�re^�e %� '�" � �(]uality (Process) 4 5 Sigma � (TDU, PPM) Fundamental Goals: Incremental Improvement Customer SaUsfaedon •Probiem Resolution (9896) •VOC Scarecard (8 3) Quallty �COPQ -15K �Customer Escapes (4 5 a) People •3stety LWCAIR ( 1) �Educatlo�aVTrainmg (20 hrs ) •Employee SabsiaeHon (61%) Peeformanae ' •Operatlng In�me •Cash Flow •Inventory —Tums , DOS -Productivlty (8 6%) Organisatfon Capability •Sbc Sigma Matu►ity (50%) Goal Deployment •tiosl treas �ha►Eers 11 • The purpose of Hoshin Kanri is to make it possible to get away from the status quo and make a ma�or pertormance improvement by analyzmg current problems and deploymg in response to environmental conditions Page 15 • Policy Deployment cascades, or deploys, top management policies and targets down the management hierarchy At each level, the policy is translated into policies, targets and actions for the next level down • With Policy Deployment, top management vision can be translated mto a set of coherent, consistent, understandable and attamable policies and actions that can be applied at ali levels of the company and in all functions of the company • When these actions and policies are applied, they result in the vision becoming reality — and a ma�or and continuing improvement in perfo�mance • Policy Deployment ensures that everyone in the company is made aware of the overall vision and targets, and the way that these are translated into specific requirements for their own behavior and activities • Hoshin Kann is an approach to improving the performance of busmess systems • A busmess system is a set of coordinated processes that accomplish the core ob�ectives of the busmess • For every business system there are measures of performance and desired levels of pertormance • Hoshin Kanr� provides a planning structure that will brmg selected cntical business processes up to the desired level of perFormance • Hoshin Kann can be thought of as the application of Demmg's Plan-Do-Check-Act (PDCA) cycle to the management process Project Chartering Framework • Overall Purpose and Process: o The high level ob�ective of the team's activities and how the work gets done • Strategic Goal: o The sigrnficant busmess issue that the team purpose addresses and advances • Team Ob�ectives & Boundaries: o What negative situation wdl be attacked, and what positive outcome will be achieved� What are the boundanes, if any� • Team Process � Scope• o Our team is a component of a larger department or process Which part of the process are we responsible for'� What work do we accomplish� • Input Boundary: o Between our scope and previous steps What happens directly before our responsibdities begin� • Output Boundary: o Between our scope and later steps What happens after directly after our responsibdities end� • Major Sub-Process: o Divide team process into ma�or process steps • Process Inputs & Suppliers: o What do we need from earlier processes, and who do we get it from� • Process Output: o What product do we give others� Page 16 Rollout and Ongoing Lean Communications design delivery Our Lean program rollout starts with a pdot program Typically it is an Lean Event where visual transformation occurs so everyone in the orgarnzation can see the changes from the current state to the future state Our rollout design consists of Communications, Participation, Education, Documentation, Validation, Financial, and Cultural emphasis Commurncations being key occurs from the Top down and the bottom up Senior Management walks the talk by participating m Lean bnefings, including Kaizen Newspaper reviews, all hands meetings, and Lean pro�ect report outs Intercompany memos and newsletters, friendly competitions occurs A3 documents commurncates the Pro�ect Status and ensures PDCA It is critically important that the communications at all levels of remam open and honest so the workforce and management are fully aware of the status and plans of the Lean efforts m order to get the best value from the improvement effort Improvement project implementation assistance and monitoring Impact Washington will assist initiatives by provided the "right resource" assistance and solution for the proper toolset and expertise Our Lean experts wdl gwde you through a continuous improvement process that identifies and eliminates waste to allow you to transform your organization mto a highly efficient and profitable organization We help you thnve through expert consulting, training programs, educationai and industry events and resources that will mcrease your profits, develop your peopie, help you be more sustainable and budd your Team Our professionals provide affordable assistance to improve your productivity, efficiency and competitiveness through technology, techrnques and best practices We understand the challenges orgarnzations face and can help you make the changes that make the difference befinreen surviving and thnving We have specialists in every area of processes for all sizes of groups, so you are sure to get the nght expertise for your specific needs Impact Washmgton will provide Lean awareness, knowledge, skdl, and execution results We focus on classifying the improvements based on Job, process, and system If Teams are to improve their performances, Impact Washmgton wdl support structures and systems needed to be aligned with the need team culture To support and provide assistance an analysis of the current systems and procedure must be undertaken Those systems and procedures that fad to support and reinforce the new way of gomg Lean Busmess must be replaced Orgarnzational systems such as perFormance appraisals and rewards that are based on individual effort and achievement must be redesigned to support team perto�rnance Impact Washington wdl focus on the House of Lean as the budding biocks for implementation strategy Page 17 Record of Past Performarece 1. Washington State Department of Commerce Contact per�on: Cheryl Smith Phone: 360-725-2808 Dates of Service: Jan, 2011, thru Oct 2011 Pro�ect Length On-going Scope: The Washington State Department of Commerce has partnered with Impact Washington since December 2010 to use Lean to streamime regulatory requirements that small businesses must comply with This effort is in response to Govemor Gregoire's Executive Order directing agencies to reduce red tape for small business Impact Washmgton has helped us to conduct eight lean process improvement workshops, covering 21 different regulatory processes This has involved the following agencies, Washmgton State • Department of Revenue • Department of Labor and Industries • Employment Securities Department • Department of Licensmg • Department of Soaal and Health Services • Department of Agnculture • Department of Commerce Other agencies • Liquor Control Board • Office of the Secretary of State • Seattle King County Public Health Problem definition In October 2010, Governor Gregoire issued an Executive Order charging state agencies to reduce the complexity of the state's regulatory and tax s system for small busmesses Small busmess growth is critical to our state's economic recovery The Executive Order mcludes a directive to Complete a sfudy to �dent►fy ways to streamline regulatory steps and reqwrements of small bus�ness without dim�n�shing publ►c health and safety Number of tra�nees: 20 Type of Intervention The type of intervention involved 1) Lean Trairnng, 2) Lean Event Facditation, and 3) Lean Mentonng and Coaching and 4) Strategic Lean Deployment Lean Training Agency representatives from the Department of Revenue, Department of Labor and Industries, Employment Securities Department, Department of Soaal and Heaith Services, and the Secretary of State, participated in value stream mapping Each agency worked on mappmg an internal process within their orgarnzation Page 18 Lean Event Facditation Impact Washington facditated the interaction between the business community and the agencies This involved meetings to identify �ssues and concerns business expenenced Processes were identified in the course of the business lifecycie and priorities were placed on working the processes with the ma�ority of issues Lean Mentoring and Coachmg The Department of Commerce identified persons withm Commerce to be mentored and coached to contmue additional process improvements withm Commerce and assist other agencies after the pro�ect is complete Strategic Lean Deployment Impact Washington has assisted the Department of Commerce in the pro�ect selection model and critena, pro�ect chartering framework, rollout and ongoing lean communications, improvement pro�ect implementation and assistance This has been withm the Department and across other state agencies as well Consultant role and responsibdities: Rhea Wallace served as the pro�ect manager as well as lean mentonng and coachmg providing oversight to the pro�ect ' Randy Sommermeyer provided Lean traming, team leader trairnng, Lean event facditation, Value Stream Mappmg Sarah Stuart provided Lean trainmg, team leader trairnng, Lean event facditation, Value Stream Mapping Carlos Venegas provided Lean trammg, team leader trammg, Lean event facditation, Value Stream Mapping Deliverables • Eight Lean process improvement workshops • Current and future state maps covering 21 regulatory processes • Process Fiow Mappmg trairnng for state agency representatives • Lean Overview trainmg for 250 Department of Commerce employees • Measurement and measurement system defirntion and implementation assistance Project Outcomes • A redesign of front end of Heaith Department plan to review process to reduce processing time for food service establishments • Redesign of time accounting system at the Department of Commerce to reduce staff time from 2 FTEs to 1 FTE and reduce error rates from 37% to 20% m a one-time reporting period • Budt and institute a Sharepomt site to track and process public disciosure requests across six divisions in a state agency • Improved organic materials registration process to reduce time and also save approximately 3-4 hours a day of copying time • Identified actions to streamline business licensing and registration processes Page 79 Department of Commerce Testimomal We have been delighted to work with Impact Washmgton The Washington State Department of Commerce has partnered with Impact Washington since December 2010 to use Lean to streamline regulatory requirements that small busmesses must comply with This effort is m response to Governor Gregoire's Executive Order directing agencies to reduce red tape for small business Impact Washington has helped us to conduct eight lean process improvement workshops, covenng 21 different regulatory processes This has involved the following agencies, Washington State • Department of Revenue • Department of Labor and Industries • Employment Securities Department • Department of Licensing • Department of Social and Health Sennces • Department of Agriculture • Department of Commerce Other agencies • Liquor Control Board • Office of the Secretary of State • Seattle King County Public Health In addition Impact Washmgton has provided lean traming and process flow mapping to more than 250 state employees A sampling of the results mclude - A redesign of front end of Health Department plan to review process to reduce processmg time for food service establishments - Redesign of time accounting system at the Department of Commerce to reduce staff time from 2 FTEs to 1 FTE and reduce error rates from 37% to 20% m a one-time reporting period - Budt and institute a Sharepomt site to track and process public disclosure requests across six divisions in a state agency - Improved orgarnc matenals registration process to reduce time and also save approximately 3-4 hours a day of copying time - Identified actions to streamline busmess licensmg and registration processes In addition to impressive results in the actual processes, we have perhaps benefited the most from Impact Washmgton's holistic approach to process improvement, change management, learnmg and innovation They have coached us, our executive leadersh�p, our middle management, and the Governor's Job Creation Sub-Cabinet on leadership, c�lture change, and lean management methods Gett�ng their guidance on how to launch a lean effort and their coaching as we have moved forward has absolutely been the key to our success so far We have worked with several different consultants at Impact Washington and have been highly impressed with their ability to help us get results whde being flexible in their approach Cheryl Smith Senior Policy Advisor Director's Office Department of Commerce 360 725 2808 360 481 7398 mobile Washington State Department of Commerce Our m�ss�on ►s to grow and �mprove �obs Page 20 2. City of Spokane Contact person Chris Cavanaugh, Manager for the city's mternal Employee Led Innovation team Phone: 509-625-6383 Dates of Service: Pro�ect kicked off on July 25, 2011. Project Length: Stdl in progress Scope. Provide "pro�ect specific" Contmuous Improvement trairnng and pro�ect mentoring for several teams from within the City organization Problem definition: Each specific pro�ect focus has its own problem definition Number of trainees: 12 specifically on the Core Team, but others that become involved in the pro�ect team from the vanous sector also get trairnng via the pro�ect and mentonng Type of Intervention: Traming on Lean basics, Kaizen events, and coachmg and mentoring, Lean Leadership trainmg Consultant role and responsibilities: Paul Hamacher is doing the specific Contmuous Improvement Kaizen (AIW) traming and pro�ect facditation Patric Sazama is playing a mentonng role meeting with the city leadership to discuss leadership needs and issues that wdi need to be addressed for this work to be sustained Deliverables: Bnng specific trairnng, mentoring and pro�ect facditation to the City Orgarnzation Each pro�ect has very spec�fic R01 targets Longer term goal is for the aty to be able to infuse this kind of on-going work throughout their organization The City has an intemal team whose full-time Job is to lead this kind of change work They have realized that they need access to and a relationship with a regional entity that can be available to come in as needed to assist Project Outcomes: See Testimornal from Chris Cavanaugh on following page Page 21 City of Spokane Testimonial: Shortly after her election, Mayor Mary Vemer decided that doing business as usuai was not going to close the City of Spokane's financial structural gap In the spring of 2009 th�rteen C�ty of Spokane employees received training in Lean Six Sigma When the trairnng was complete the Employee Led Innovation (ELI) program was established with finro full time empioyees assigned Over the next two years several pro�ects were initiated Some of those pro�ects, primardy in Police and Solid Waste resulted in sawngs Several pro�ects were not successful As program manager I recognized three primary obstacles (1) In many of our departments processes were not well documented, (2) there was littie to no data coilected that could tell us about the variation in a process, and (3) we did not have the tools we needed to work proJects in those departments to completion ELI was floundenng I knew a change was needed to keep our program alive I �oined the Lean Management Consort�um in Spokane and sought out Lean practitioners in the private sector Many of these practitioners suggested contacting Patnc Sazama of Impact Washington to discuss the deficiencies in our program In our irntial meeting with Mr Sazama I began to understand that our focus had been too narrow As a City we needed ali of the tools Lean/Continuous Improvement offers, not�ust Six Sigma The Mayor agreed that in order to be successful in the pursuit of a better way of doing business we needed the consulting and trainmg offered by Impact Washington Smce retaming Impact Washmgton the ELI program has taken on new life Mr Sazama met with our Mayor and City Administrator, delivering a message of the importance of accountabdity for all senior leadership in a way that was understood and has been acted upon Paul Hamacher is leading a group of employees through a number of pre-selected pro�ects, usmg an interactive leam-do model Additionally, Mr Hamacher is coachmg City employees by workmg with us in a series of Kaizen events focusing on areas such as 5S, Value Stream Mapping and Standard Work Mr Sazama and Mr Hamacher wiil also be workmg with ELI staff to • Wnte an overall 1-3 year plan for the City of Spokane including ma�or improvement activities and cu�tural goals • Identify ELI group roles and responsibdities, resourcing, and capabilities • Prepare commurncation plans and processes mcluding new releases and web site mformation As a customer of Impact Washington I am delighted As a recent convert to the phdosophy of continuous improvement m government I am exated beyond words at the impact I know ELI wdl now be able to make in the City of Spokane Chris Cavenaugh, Program Manager Contmuous Improvement Page 22 3. Spokane Community Colleges Contact person: Dr Janet Gullickson Phone: (509) 534-5062 Dates of Service: Pro�ect Kick-off January 2011 Pro�ect Length On Gomg Kaizen Work was completed in July 2011 The new process is currently in action Follow-up on the pro�ect is expected to be completed by December 2011 Scope Student Seroices Process Standardization Problem de�nition• The Commurnty Coliege asked us to focus our trammg on improwng student experience from the time of irntial interest m registering for a program to the first day of class There is a common belief that if waste is removed from the process, and processes are standardized, the student experience wdl be enhanced, the community at large wdl benefit, and the work life of the staff wdl be improved Number of trainees: 60 Types of Intervention: Lean Enterprise Transformation. Trairnng on Lean basics, Kaizen (AIW) events, and coachmg and mentonng, Lean Leadership training, and key employees were certified as Lean Enterprise Certified Practitioners (LECP) Consultant role and responsibdities: Sarah Stuart is domg the specific Contmuous Improvement Kaizen (AIW) trairnng and workshop facditation Gary Alvarado (Idaho MEP TechHelp) provided the training for the Lean Enterprise Certificate Program Deliverables: A common student experience across all three organizations that enhances student learrnng and is designed by those who do the work This mcluded standardizing processes in the Student Services areas, improving how IT leverages talent to complete pro�ects that benefit the district, and improving the speed in which financial aid packages are processed This was accomplished m six months Project Outcomes: A student admissions, registration, and financial aid process budt from the students' point-of-view by the "people who do the work A Standard Process for Continuous Improvement using data, accordmg to the standards set by management and best practices Page 23 Spokane Community Colleges Testimonial: Dr Christine Johnson, Chancelior of Community Colleges of Spokane with 30,000+ students among three mstitutions over s�x counties in eastern Washington, charged the student services units of the institutions to redesign their services by creating seamless transitions for students among the institutions, standard processes across the colleges and a common student portal Along with the three CEOs of CCS institutions and Impact Washington, she implemented a lean transformation, startmg with 40 front-line employees and including lean certification trainmg for 20 administrators, directors and faculty With the most-valued help of Impact Washington, within six months, Commurnty Colleges of Spokane transformed its student sennces by creat�ng standard processes across its colleges We mapped current processes, measured wait times and breaks, determmed what adds value to student learnmg, and created the desired future state with mirnmal waste and maximum value The end result was a student admissions, registration, and financial aid process built from the students' point-of-view by the "people who do the work " One example of a ma�or deliverable was that, unlike past years, all students who met the priority finanaal aid deadlme had their financial aid ready for fall start Without Impact Washington and the�r generous coaching, advice, facditation and expertise, this transformation would not have happened We highly recommend them and their approach In fact, we have subsequently asked them to assist in the transformation of our IT departments If you should wish more information, piease contact me at 509 434 5062 or ianet aulhcksonCa�ccs spokane edu Page 24 Resumes - Staff and Partner Qualifications IMPACT WASHINGTON Staff IMPACT WASHINGTON has 15 full-time employees who work with Washington manufacturers statewide IMPACT WASHINGTON has six pro�ect managers and three in-house process improvement specialists with a variety of experience that serve IMPACT WASHINGTON clients statewide They are Krassimir Totev, Regional Project Director, Western WA Mr Totev has over 25 years of experience in engineenng, production and pro�ect management m Europe and the U S In addition to servmg as Regional Pro�ect Director for Westem Washington, he is also a LEAN Practitioner and a certified Six Sigma Black Belt He holds an MS degree in Chemical Engmeering He has been involved in equipment design, product and process development, capital investments, scheduling of operations, preventive mamtenance, productivity improvements, logistics and inventory control, permit applications and compiiance with environmental regulations, customer support and troubleshooting, development, implementation and management of production and quality programs such as Lean, ISO and Six Sigma Dunng his 14-year tenure with Impact Washmgton, Mr Totev has developed, managed and delivered traming and implementation for a great number of Lean Transformation pro�ects with over 100 WA State comparnes Lean Trairnn� I x Lean Facilitatio x Lean Coachin� & Mentorin� x Lean Deqlovment 1 x Patric Sazama, Regionai Project Director, Eastern WA Mr Sazama is the Regional Pro�ect Director for Eastem/Central Washington and has been with Impact Washmgton smce 2002 During that time he has provided pro�ect development and management assistance as well as orgarnzational leadership coaching to many companies throughout the region m a wide range of industries His specialty areas include management leadership coaching, team efficiency and conflict resolution Patnc is also a certified Innovation Growth Coach through the Eureka� Ranch Winnmg Ways program In his Growth Coach role Patric works with organizations and entrepreneurs to accelerate profitable growth through new or improved products, services, customers or markets Before coming to IMPACT WASHINGTON, Patric had his own consultmg busmess focused on Orgarnzational Leadership Excellence Pnor to starting his own consultmg business Patric spent 20 years w�th Hewlett-Packard/Agdent Technologies Patric has a MBA in International Busmess from the University of Idaho as well as a BS in Management Technology through Lewis/Clark State College Lean Trairnn� I x Lean Facditation � x lean Coaching & Mentonn� � x Lean Dealovment I x Page 25 Rhea Wallace, Director Client Services Mr Wallace has spent the last 10 years providing assistance to small and mid-sized orgarnzations As Director of Client Services and a Pro�ect Manager for IMPACT WASHINGTON, he is responsible for assistmg Washington state manufacturing companies increase their abdity to compete He is a NIST/MEP Professional Business Advisor (PBA) and has engaged in strategic- level transformat�on activities with clients His responsibdities include delivenng and coordinating delivery of sennces such as strategic planning, transformat�on planning, quality management systems, financial analysis, as weil as improvement tools such as 5S, Process Mapping, Kanban, LEAN, PDCA and SPC He has over 20 years of manufactunng experience in small and mid-sized comparnes and is nationally recogrnzed for his work m transforming small businesses into national leaders Rhea's background is especially strong in strategic planning, lean manufactunng, team- based problem solving and supply cham management He is a Growth Services Coach, ass�sting comparnes in creating and impiementmg ideas to grow their bottom line He is a four-time state Malcolm Baldrige exammer He holds a degree in Business Management (BBA) from the Urnversity of Miami, and he is the owner and former President of an aerospace manufacturing firm based m Texas Qualifications: Lean Trammg x Lean Facditation x Lean Coachmg & Mentormg x Strategic Lean Deployment x Michael Schneider, Project Manager Mr Schneider's 30 year career m manufactunng mcludes senior management expenence in the metal mdustry He has a solid background in executive management, busmess and strategic planning and marketmg and sales strategy As the sernor executive, he led Lean transformations for three comparnes He managed the acquisition and operationai mtegration of several companies He also developed marketing capability that mcluded corporate branding materials, web site and trade show strategies Degree and Professionai Affiliations B S m Marketmg from San Jose State University Washington Employers — Served on Executive Committee and Board of Directors Steel Service Center Institute — Past President of the Washington Chapter Spokane Chamber of Commerce — Trustee and Past Member of Executive Committee Lean Trainmg Lean Facilitat�on Lean Coachm� & Mentori Lean Deplovment Bob UptagrafFt, Project Manager Mr Uptagrafft's 30-year career in manufacturing includes management expenence m a number of advanced electronic comparnes His areas of expertise include strategic and tactical planrnng, staff trammg and development, and ISO quality systems He has a solid background in Operations Effiaency, Quality Improvement and Compliance, Organizational Leadership, New Product Development and Pro�ect Management Page 26 Lean Trainmg x Lean Facditation x Lean Coachm� & Mentorm� I x Lean Deqlovment I x Roger Milliman, Project Manager Roger Mdliman has over 25 years of career experience m strategic planning, venture investments, business development, and pro�ect and operational management His finance background mcludes expenence m both private and public funding, and he has developed and taught Total Quality Management curnculum in the commurncations industry His business acumen is aiso exemplified m his co-ownership of a successful small busmess He holds a Bachelor of Science degree in economic studies from the University of Oregon Lean Trainme I x Lean Facilitation x Lean Coachin� & Mentorin� x Lean Denlovment I x Sarah Stuart, Process Improvement Specialist Ms Stuart has over 10 years of expenence in process improvement with a proven track record of increasing product speed and reducing costs Ms Earl is an instructor for the SME/AME/Shingo Pnze LEAN Enterprise Certification Program (LECP), Six Sigma instructor usmg the American Society for Quality (ASQ) curnculum, and a certified instructor for Training Withm Industry (TWI) Programs Her responsibdities include delivermg services such as transformation planrnng, quality management systems (ISO 9002/AS9100), six sigma irntiatives as well as improvement tools such as 5S, Process Mapping, 3P (Production Preparation Process), LEAN Manufactunng, PDCA and Six Sigma She holds a degree in Matenal Science and Engineermg from lowa State Urnversity She has over 10 years experience applying process improvement in the cast parts industry and speaks regularly at public conferences on LEAN sub�ects Lean Training x Lean Facilitation x Lean Coaching & Mentormg x Strate�ic Lean Deplovment Charles "Luke" Lukey, Process Improvement Specialist Mr Lukey has over 17 years of experience in traming and implementmg solutions usmg Toyota Production System methods Mr Lukey has led Kaizen events at sites including Department of Defense contractors, hosp�tal systems, printers, furrnture manufacturers and dairy mdustry suppliers He has facditated client tours of Japan's top LEAN companies including Toyota Home, Page 27 Omron and Toto Industries He is a certified TWI instructor Mr Lukey holds a Bachelors Degree from Evergreen State College Qualifications: Lean Traming x Lean Facilitation x Lean Coaching & Mentormg x Strategic Lean Deployment Soraya Dossa, Environmental and Energy Specialist Ms Dossa is a graduate of Western Washington University She �oined IMPACT WASHINGTON as an environmental and energy specialist and has worked with the Department of Ecology to deploy "LEAN and Green" pro�ects with companies, helping them to improve processes to eliminate both process waste and environmental waste She also works with WSU's Energy group, workmg to provide energy value stream maps to clients to identify potential energy savings She also assists with Lean implementation pro�ects Qualifications: Lean Trammg x Lean Faalitation x Lean Coaching & Mentoring Strategic Lean Deployment Our executive and operations team is located at our headquarters in Mukdteo, WA They are John Vicklund, President Amy Romer, Controller Linda Adams, Director of Marketing Jessica Ingle, Operations Specialist Shauntel Schlueter, Admirnstrative Assistant Page 28 IMPACT WASHINGTON Senior Strategic Partners In addition to our in-house process improvement speaalists, IMPACT WASHINGTON has developed strategic partnerships with external consultants to serve of our clients Carlos Venegas, Process Improvement Specialist Carlos Venegas, prmciple of Straus Forest LLC, has designed and led scores of successful process-improvement implementations in a variety of organizations, both business and govemment A published author, he wrote the book Flow in the Office Implementing and Sustairnng Lean Improvements Published in 2007 by Productivity Press, a division of Taylor & Francis He has led the development and impiementation of large-scale mitiatives, includmg Lean for the O�ce and Empioyee Involvement, designed, developed, and launched a Lean program in a 1,400-person bus�ness unit at the Boeing Company, delivered Lean coaching, consulting, and traming to leadership up to the executive level in a vanety of comparnes, coordinated with management teams to implement Lean and Employee Involvement, designed, developed, and implemented customized Lean tools tadored to office environments, led numerous ka�zen process improvement workshops and value stream mapping workshops in both factory and office environments He is a certified Lean consultant and holds a Masters degree in Applied Behavior Science Qualifications. Lean Trairnng x Lean Facilitation x Lean Coaching & Mentoring x Strategic Lean Deployment x Patrick J. Ryan, C.P.M., C.P.P. — Hoshin and Lean Specialist Patrick has over 40 years experience m materiel, procurement, manufactur�ng, engineenng, operations, customer and product service, quality, legal, service parts and business development He provides clients expertise in strategic planrnng using policy deployment, supply chain management, lean manufacturing, total quality management, new product development and training Patnck is a"sensei" or expert in all the tools found in the Toyota Production System These include Policy Deployment, 5S with Visual Controls, Single Mmute Exchange of Dies, Standard Work, Total Productive Maintenance, Design for Manufacturabdity and Assembly, New Product Development Systems, Quality Function Deployment, Production Preparation Process, Supply Chain Management, Process Mapping, Value Stream Mappmg, Pull Systems with KanbanlJidoka, Variety Reduction Planrnng, Value AnalysisNalue Engineering, Activity Based Costing, Statistical Process Control, QC Tools, Fadure Mode and Effects Analysis Patnck holds a B S in Industrial Management from Washmgton University with credits for a dual B S in Mechanical Engineering He obtained his C P M (Certified Purchasing Manager) from the National Association of Purchasing Management, his C P P(Certified Purchasing Professional) from the American Purchasing Society, a Tool Design Certificate, and has been published in various trade publications and speaks regularly at Public Conferences and Symposwms on a variety of lean sub�ects Lean Train Lean Facditation I x lean Coachm� & Mentorm� I x Lean Denlovment I x - - Page 29 Richard (Rick) Baker — Hoshin � Lean Specialist Rick Baker works with orgarnzations executmg World Class Methodologies including Strategic & Tactical Planning using Goal Deployment, Operational Excellence - including Lean Enterpnse and Six Sigma, Value Stream Mappmg, Kaizen's and Organizational Development Pnor to Consulting, Rick held the position of Vice President of Engineermg and Operations and Officer for Precor International, an Amer Sports Company Before being recruited to Precor, Rick was President and CEO of Cavan Communities located m Scottsdale, Arizona A pnvately held company with mvestments in Professional Sports, Class A Office Buildmgs, Golf Course Development, and Retirement Commurnt�es At AlliedSignal/Honeywell, Rick heid the position of Director of Operations While at AlliedSignal/Honeywell Rick was selected as Manager of Strateg�c Planning and focused on Mergers and Acquisitions for the Aerospace Sector Prior to AlliedSignal/Honeywell, Rick spent 10 years with the Boeing Company Rick Baker holds two degrees from the University of Washmgton and has a Six Sigma "Green BeIY' and "Black BeIY' Cert as well as a Lean Enterprise Master as certified by the University of Tennessee Rick has an Intemal Malcolm Baldrige Examiner as certified by AlliedSignal/Honeywell Qualifications: Lean Traming Lean Facilitation Lean Coachm� & Mentori Lean De�lovment I x Paul Hamacher, Hoshin and Lean Specialist Paul is the President and CEO of Hamacher and Assoc�ates, a growing product development and process improvement consulting company Paul gained his practical business education at Rockwell International, Boeing and Honeywell With Boeing, he gained a wide range of experience over 14 years in key positions of Quality Assurance, Manufacturing, Information Technology and Business Management positions At Honeywell, Hamacher was Director of Lean Six Sigma for their Electrorncs Materials Division where he budt on his previous expenence in Lean Manufacturing As Director, he managed a portfolio of over 140 pro�ects globaliy while training, mento�ing and certifying employees Paul was born and raised in Spokane, Washington He holds a bachelor's degree from Washmgton State Urnversity and a master's in business administration from Nova Southeastern University He is a Master in Lean Manufacturing and holds a Retad Supply Chain certification In addition to his dady work activities, Paul is occasionally an ad�unct professor at Gonzaga University and has served on the Board of Directors of the International Trade Alliance Qualifications• Lean Trammg x Lean Facilitation x Lean Coachmg & Mentoring x Strategic Lean Deployment x Mark Rosenthal, Lean Specialist Mark Rosenthal has over 30 years of mditary, industnal, and consultmg expenence, the past 20 of which have focused on Lean Transformations His speaalties include deep understandmg of the Toyota Production System that goes beyond the tools and mto the leadership and management processes He has expenence engagmg the front-Ime team and team leaders with A3 and work cells, executive development, study missions, strategy development, 3P, and supplier development He has worked with admmistratwe as well as industrial processes ranging across a diverse range of goods and services mcluding consumer products, electrorncs, medical devices, Page 30 aerospace, construction equipment and raw materiais processing Mark developed his lean expertise as a member of teams leading lean transformations at Boemg, Gerne Industnes, Eastman Kodak, Terex and Zodiac Aerospace Mark publishes the Lean Thinker blog and provides expert comments to a variety of Lean communities Qualifications: Lean Trairnng x Lean Facilitation x Lean Coach�ng & Mentorin x Strategic Lean Deployment x Kurt Armbruster, Transformation Specialist Armbruster has held Chief Operatmg Officer and General Manager positions at Aerospace, Manufactunng, and Technology companies Most recently he led the ELDEC dwision as Vice- President of Crane Aerospace In his roles, he has managed all aspects of company operations mcluding product development, new business capture, manufacturing, supply cham, customer service, finance, human resources, IT and business process He has been a leader m business process improvement leading irntiatives to brmg greater productivity and lean pnnaples to the product development and admirnstrative parts of the business As co-founder Kurt also started and led his own technology company (SmartContractor) leading and positionmg it for acqwsition and he has been in-charge of several multi-mdlion dollar successful turn-around assignments Armbruster has a consistent record of cleanmg up and resolving difficult situations and implementing improved processes, more effective teams, and on-time pro�ects to achieve greater operational and financial results Kurt was raised in Issaquah, Washington He earned a bachelor's and master's degree m mechanicai engmeering from MIT with Tau Beta Pi honors He is a certified Dale Carnegie instructor and has been recogrnzed for his historic preservation efforts in the Seattle commurnty Lean Trairnng Lean Facilitation Lean Coachin� & Mentori Lean Deplovment I x Gordon (Gordy) Anderson, Management and Leadership Specialist Global Management Resources Leader with 25-plus years driving strategic business and operations mitiatives He has a proven track record of diagnosmg, untangling and resolving complex orgarnzational challenges Has a special mterest and passion �n leading, facditating and problem solving the human elements of lean busmess systems implementation, with 20 years of expenence managing in a rapidiy evolvmg lean business culture He spent 12 years with Genie Industnes in vanous management positions Lean Training Lean Facditation lean Coaching & Lean Deqlovment Page 37 Michael Schmich, Lean Culture Specialist A trainer, traming designer, and consultant who has worked in manufacturing, education and traming since 1975 both nationally and internationally - in places such as Mexico, Japan, Brazd, and the Phdippines His broad trairnng expertise and bdmgual capabilities (Sparnsh 8� Japanese) significantly enhance an orgarnzation's trainmg efforts He is a certified instructor of Tra�ning Within Industry, (TWI) in both Spanish and English - courses aimed at developmg supervisors' skdls in instructing leading other workers, and the contmuous improvement of �ob methods Lean Traming x Lean Facilitation x Lean Coachmg & Mentoring x Strate�ic Lean Deplovment x Page 32