Loading...
HomeMy WebLinkAbout5170 Contract Number: 5170 Vendor: AECOM Subject: PSA - Gorst Creek Watershed Comprehensive Plan Department: Engineering File Class: LEG 12 -1 Begin Date: 9/13/2012 End Date: 7/31/2014 Review Date: 4/1/2014 Vault Date: Comments: CO #01 6/10/13; CO #02 3/12/14 CONTRACT MODIFICATION AGREEMENT NO.2 BETWEEN THE CITY OF BREMERTON AND AECOM PROJECT Gorst Creek Watershed Comprehensive Plan CONSULTANT AECOM DATE March 12, 2014 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Professional Services Agreement AGREEMENT (the "Contract ") entered into between the City of Bremerton and AECOM on 9/13/2012, and amended by Contract Modification No. 1 dated June 10, 2013. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section L Scope , is modified as follows: Task 1 scope is amended to include the work described in the attached AECOM letter proposal dated February 26, 2014 attached as Exhibit A. Section H. Term , is modified as follows: The Consultant shall complete the work described in this Contract Modification Agreement by 7/31/2014 Section . III. Compensation , is modified as follows: The contract amount including Contract Modification No. 1 was Five Hundred Eighty Thousand Six Hundred Seventy -Five Dollars ($580,675.00) The City shall pay the Consultant for the additional work described above, based on time and materials, an amount not to exceed Twenty- one Thousand Seven Hundred Fifty Dollars ($21,750.00) for a total amended contract amount of Six Hundred and Two Thousand Four Hundred Twenty -Five Dollars ($602,425.00). including this Contract Modification No. 2. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant's claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on -site or home office overhead, or lost profits. This Contract Modification does not limit the City's right to bring a claim for past performance. CONTRACT MODIFICATION I Project Number: 5 The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. City Engineer / Public Works Director approved to process -- I ittals and Date CONSULTANT. THE CITY OF BREMERTON AECOM By f f P By Pa t Its 6WA417OWS / = Its M r q DATE: 3I� �! �� DATE: APPROVED AS TO FORM: A ST: Bremerton City Attorney City Clerk NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: Bill Webb, P.G. Chat Martin, P.E. Project Manager Director of Public Works & Utilities 710 Second Avenue, Suite 1000 100 Oyster Bay Avenue North Seattle, WA 98104 Bremerton, WA 98312 R \LEGAL \Contracts\FORMS \Contract Modification (2003) doe CONTRACT MODIFICATION 2 Project Number: y A='OM AECOM 206.624.9348 tel 710 2n Avenue 206.623.3793 fax SuBe 1000 Seattle, WA 98104 www aecom.COM February 26, 2014 Mr. Tom Knuckey, PE City Engineer City of Bremerton 3027 Olympus Drive NE Bremerton WA, 98310 Dear Mr. Knuckey: Scope of Work to Complete SUSTAIN Modeling Scope AECOM is pleased to present the following scope of work to complete the SUSTAIN modeling of the Gorst Creek Watershed based on changed conditions to our original scope of work. The following scope addresses all EPA comments included in Track Changes in the attached Technical Memorandum titled "HSPF Hydrologic Modeling and SUSTAIN Stormwater Modeling of the Gorst Creek Watershed" to allow acceptance of the Technical Memorandum by EPA and consists of the following: • Addressing the EPA comments on the current technical memorandum dated January 2014 • Rerunning the SUSTAIN Model based on incorporation of the additional northern sub basin (21) as indicated in EPA comments • The HSPF will be updated for the addition of sub basin (21) • Revision to existing GIS drawings per EPA comments • Adding utility maps and discussion of utilities per EPA comments • Expansion of modeling methodology discussions based on EPA comments • Discussion of individual sub basin conditions for land cover • Discussion of optimization of reduction vs, optimization of cost per EPA comments • Up to 18 hours for two staff personnel to coordinate comment response with EPA Assumptions • No additional substantive changes will be required by EPA beyond those indicated in the comments • No individual modeling for SUSTAIN on each sub basin is included • Optimization effectiveness discussion will be qualitative and no additional model presentation for each alternative is required. Schedule AECOM can proceed immediately. Our estimate to complete this effort is 25 business days. XH E ZIT 13 GmNT,' tT r<loi� t r c Ai o t.4 t�lo, Z Mr. Tom Knuckey, PE City of Bremerton February 26, 2014 Page 2 Cost The total cost is $21,750. This is based on the following: • Modeler /technical lead 60 hours at $125/hour • PM/QA/EPA discussions 40 hours at $175 /hour • GIS 40 hours at $115 /hour • Technical editor 20 hours at $95/hour • Admin 10 hours at $75 /hour Sinc rely, Bill W , G, PMP Projec anager A&& W44?Ir— Allen Bennett Project Director C,i�% Q Contract Number 5170 Vendor: AECOM Subject PSA - Gorst Creek Watershed Comprehensive Plan Department Engineering File Class LEG 12 -1 Begin Date 9/13/2012 End Date 7/31/2014 Review Date. 4/1/2014 Vault Date: Comments CO #01 6/10/13 CONTRACT MODIFICATION AGREEMENT NO. 01 BETWEEN THE CITY OF BREMERTON AND AECOM PROJECT Gorst Creek Watershed Comprehensive Plan .CONSULTANT AECOM DATE June 10, 2013 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Professional Services Agreement AGREEMENT (the "Contract ") entered into between the City of Bremerton and AECOM on 9/13/2012. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows I. Section I. Scope , is modified as follows Task 1 is to be modified as follows • Assist the EPA in developing their new SUSTAIN (BMP Optimization) model Work included weekly meetings with EPA, and multiple re- calibrations resulting from EPA directed upgrades to the SUSTAIN operating platform • Lead development of the land cover map analysis for the watershed characterization report which was previously scoped to be performed by Ecology • Lead all aspects of development of the HSPF modeling, the previous scope envisioned assistance from Ecology • Lead integration of Bremerton GIS data layers into SUSTAIN which was previously scoped to be performed by the City of Bremerton Section II. Term , is modified as follows The Consultant shall complete the work described in this Contract Modification Agreement by 7/31/2014 Section III. Compensation , is modified as follows The original contract amount was Five Hundred Sixty Thousand Six Hundred Seventy -Five Dollars ($560,675.00) The City shall pay the Consultant for the additional work described above, based on time and materials, an amount not to exceed Twenty Thousand Dollars ($20,000.00) for a total amended contract amount of Five Hundred Eighty Thousand Six Hundred Seventy -Five Dollars ($580,675.00), including this Contract Modification. II. CONTRACT MODIFICATION I Project Number 14 Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant's claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on -site or home office overhead, or lost profits. This Contract Modification does not limit the City's right to bring a claim for past performance. The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. City Engineer / Public Works Director approved to process '-7 / t / (3 Initials and Date CONSULTANT. THE CITY OF BREMERTON AE By By Pa e t Its b ld ftefl Its Ma )kr DATE � 3 DATE APPROVED AS TO FORM: ATTEST: Brenlerton City Attorney City Clerk NOTICES TO BE SEN O: NOTICES TO BE SENT TO: Bill Webb, P G Chal Martin, P E Project Manager Director of Public Works & Utilities 710 Second Avenue, Suite 1000 100 Oyster Bay Avenue North Seattle, WA 98104 Bremerton, WA 98312 R TEGALContractsTORMS \Contract Modification (2003) doc CONTRACT MODIFICATION 2 Project Number Contract Number: Vendor: Sub�ect: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments : 5170 AECOM PSA - Gorst Creek Watershed Comprehensive Plan Engineering LEG 12-1 9/13/2012 12/31/2013 � � PROFESSIONAL SERVICES AGREEMENT GORST CREEK WATERSH�D COMPREHENSIVE PLAN — CONTRACT WITH AECOM The Crty of Bremerton ("Crty") and AECOM ("Consultant"), referred to collectively as the "Parties," enter mto the followmg Agreement for professional services I. Scope: The Consultant agrees to perform the services more specifically described m the Scope of Work, dated June 2012, includmg any attachments thereto, attached hereto as Exhibrt A, which is mcorporated by reference herein The Scope of Work may be modified only pursuant to Section VII G of this Agreement If the Scope of Work provides for unspecified additional services such services shall only be performed upon the express written request of the Crty Consultant further represents that the services furnished under this Agreement will be performed m accordance wrth generally accepted professional prachces m effect at the time such services are performed II. Term: The Crty and the Consultant agree that work will begin on the tasks described in Exhibit A immediately upon execution of this Agreement The parties agree that -the work described in Exhibrt A is to be completed as provided for m the work schedule attached hereto as Exhibrt B, provided however, that addrtional time shall be granted by the Crty for excusable delays or extra work as provided for in section IX (A) of this agreement III. Compensation: In consideration of the services provided pursuant to this Agreement, the City shall pay Consultant in an amount not to exceed $560,675 Consultant's charges and bills shall conform to the fee schedule attached hereto as E�ibit C and incorporated herem by this reference The Consultant shall submit regular billmg statements detailmg work performed and amount charged on each task or portion thereof The descriptions shall conform to and fall within the categories set out in the Scope of Work and/or Fee Schedule Upon receipt of a conformmg billmg statement, the City shall promptly process payment PROVIDED, HOWEVER, the Crty reserves the right to priorrtize scoped work and accelerate and/or delay wark tasks under the time frame set forth in Section II herem The Consultant's labor rates and billing fees shall be as delineated in Exhibit C Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement Consultant shall only be compensated for additional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be m accordance with Exhibrt C If a billmg statement does not conform to this Agreement, the City may wrthhold payment until the statement is brought mto compliance Such withholding does not relieve Consultant of rts obligations under this Agreement Bremerton/AECOM Gorst Creek Watershed Comprehensive Plan Page 1 of 6 1 L IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed in the Scope of Work and is performmg mdependent functions and responsibilities wrthm its field of expertise Consultant and rts personnel are independent Consultants and not employees of the City Consultant and its personnel have no authorrty to bmd the City or to control the City's employees and other Consultants None of the benefits provided by the City to its employees, mcludmg, but not limited to, compensation, msurance, and unemployment msurance are available from the City to the employees, agents, representatives, or sub-Consultants of the Consultant Consultant will be solely and entirely responsible for its acts and for the acts of Consultant's agents, employees, representatives and sub-Consultants durmg the performance of this Agreement The Crty may, during the term of this Agreement, engage other mdependent Consultants to perform the same or similar work As an independent Consultant, Consultant is responsible for its own management The Crty's admirustration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Consultant or its personnel As an mdependent Consultant, Consultant is responsible for payment of all taxes and licensing fees necessary to perform rts obligations under this Agreement These taxes and fees mclude but are not limited to State mdustrial insurance, Business & Occupation, State professional licensing, and City business licensing If any taxes or fees due the Crty have been declared delmquent, the City may withhold the delinquent amount, plus any additional charges arismg from the delmquency, from any payments due Consultant V. Indemnification: Consultant shall defend, mdemmfy and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, m�uries, damages, losses or suits, mcludmg all legal costs and attorney fees, arismg out of or m connection with the performance of this Agreement, to the extent caused by the negligence of Consultant The City's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of mdemmfication Should a court of competent Jurisdiction determine that this Agreement is sub�ect to RCW 4 24 115, then, m the event of liability for damages arismg out of bodily m�ury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE 1NDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF IMMUNITY UNDER 1NDUSTRIAL 1NSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS 1NDEMNIFICATION THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER The provisions of this section shall survive the expiration or termmation of this Agreement Bremerton/AECOM Gorst Creek Watershed Comprehensive Plan Page 2 of 6 VI. Insurance: The Consultant shall procure and mamtam for the duration of the Agreement, insurance agamst claims for in�uries to persons or damage to property which may arise from or m connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees, sub-consultants or sub-Consultants Before begmmng work on the pro�ect described tn this Agreement, the Consultant shall provide a Certificate of Insurance evidencing ' 1. Automobile Liabititv insurance wrth limrts no less than $1,000,000 combined smgle limit per accident for bodily in�ury and property damage, and 2. Commercial General Liabilitv insurance written on an occurrence basis with limits no less than $1,000,000 combmed single limit per occurrence and general aggregate for personal in�ury, bodily in�ury and property damage Coverage shall mclude but not be limrted to blanket contractual, products/completed operations/broad form property damage, explosion, collapse and underground (XCU) if applicable, and employer's liabilrty, and 3. Excess Lia6ilitv msurance with limits not less than 1,000,000 limit per occurrence and aggregate 4. Professional Liabilitv msurance with limrts no less than $1,000,000 limit per occurrence/claim Any payment of deductible or self msured retention shall be the sole responsibility of the Consultant All required policies shall be provided on an"occurrence" basis except professional liability msurance (if required), which may be provided on a"claims-made" basis The City shall be named as an additional msured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the City, which names the Crty as an addrtional insured shall be attached to the Certificate of Insurance The Crty reserves the right to receive a certified copy of all the required msurance policies and endorsements The City further reserves the right to re�ect any unacceptable policies and/or endorsements The Consultant's Commercial General Liability insurance shall contam a clause stating that coverage shall apply separately to each insured agamst whom claim is made or surt is brought, except with respects to the limits of the insurer's liability The Consultant's msurance shall be primary msurance as respects the Crty and rt shall be an affirmative obligation upon the consultant to advise the City's Risk Manager by fax at (360) 473-5161, or by certified mail, return receipt requested to City of Bremerton, attn Risk Management, 345 6 Street, Suite 600, Bremerton WA98337 withm two days of cancelation, suspension or substantive change of any insurance policy set out herein, and failure to do so shall be construed to be a breach of this Agreement Bremerton/AECOM Gorst Creek Watershed Comprehensive Plan Page 3 of 6 � i The Crty also reserves its unqualified right to require at any time and for any reason, proof of coverage in the form of a duplicate of the insurance policy with all endorsements as evidence of coverage VII. General Conditions: A Reports and Information When requested by the Crty, Consultant shall furnish periodic reports and documents on matters covered by this Agreement The reports and documents shall be furnished in the time and form requested Consultant shall maintam accountmg records m accordance with Generally Accepted Accountmg Principles (GAAP) to substantiate all billed amounts B Ownership and Use of Records and Documents Original documents, drawings, designs and reports, mcluding those in electromc format, developed under this Agreement are the property of the Crty All written mformation submitted by the Crty to the Consultant m connection with the services performed by the Consultant under this Agreement will be safeguarded by the Consultant to at least the same extent as the Consultant safeguards like information relatmg to its own business If such information is publicly available or is already m Consultant's possession or known to it, or is rightfully obtamed by the Consultant from third parties, Consultant shall bear no responsibilrty for rts disclosure, madvertent or otherwise All data, documents and files created by Consultant under this Agreement may be stored at Consultant's office m Seattle, Washmgton Consultant shall make such data, documents, and files available to the Crty upon its request at all reasonable times for the purpose of editing, modifymg and updating as necessary until such time as the City is capable of storing such mformation in the City's offices Duplicate copies of this information shall be provided to the City upon its request, and at reasonable cost All documents, including all reports, drawmgs, specifications, computer software or other rtems prepared or furnished by Consultant pursuant to this Agreement, are mstruments of service with respect to the pro�ect and are the property of the City Any reuse by the City for other than the specific purpose mtended will be at City's sole risk C Work Performed at Consultant's Risk Consultant shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and sub-consultants m the performance of the work hereunder and shall utihze all protection necessary for that purpose All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection wrth the work D Place of Work The Consultant shall perform the work authorized under this Agreement at its offices in Seattle, Washmgton Meetings with the Crty staff as described m Exhibrt A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties Bremerton/AECOM Gorst Creek Watershed Comprehensive Plan Page 4 of 6 E Entire A�reement This Agreement and rts Exhibrts constrtutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement F Severabilitv Should any part of this Agreement be found void, the balance of the Agreement shall remam in full force and effect G Modification This Agreement may only be modified by written mstrument signed by both Parties H Written Notices All commumcations regarding this Agreement shall be sent to the parties at the addresses listed below by registered or 1 st class mail, or by personal service, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified m writing Crty Address 100 Oyster Bay Avenue North Bremerton, WA 98312 Consultant Address 710 Second Avenue, Suite 1000 Seattle, WA 98104 I Waiver Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision Waiver of any right or power arismg out of this Agreement shall not be deemed waiver of any other right or power J Non-Waiver of Breach The failure of the City to msist upon strict performance of any of the covenants and agreements contamed herein, or to exercise any option herein conferred in one or more instances shall not be construed to be a waiver or relmquishment of said covenants, agreements or options, and the same shall be and remain m full force and effect K Comnliance with Laws Consultant shall comply with all applicable Federal, State, and local laws in performmg rts obligahons under this Agreement L Choice of Law and Venue This Agreement shall be mterpreted according to the laws of the State of Washmgton Any �udicial action to resolve disputes arismg out of this Agreement shall be brought in Krtsap County Superior Court M Attorneys' Fees In the event of litigation to enforce any of the terms or provisions herein, each party shall pay all its own costs and attorney's fees N Assi� Any assignment of this agreement by the Contractor v�nthout the written consent of the City shall be void VIII. Nondiscrimination: Consultant shall not discriminate m employment or services to the public on the basis of race, color, national origin, sex, religion, age, marrtal status, disabilrty, or sexual orientation except for employment actions based on bona fide occupational qualification. Bremerton/AECOM Gorst Creek Watershed Comprehensive Plan Page 5 of 6 IX. Termination: This Agreement shall remain in force until completion and acceptance of the services, terminated by wntten instrument upon mutual consent, or by the City af Bremerton for convenience. Tlus Agreement may be immediately terminated for cause by a Party if the other Party substantially fails to perform through no fault of the terminatmg Party, and the non- performmg Party does not commence correction of the failure of performance within thiriy (30) days of the ternunating Party's sending notice to the non-performing Party Any Notice by Consultant shall include a report showing the status of all items listed in the Scope of Work current through the termination date If the City receives reimbursement by any federal, state, or other saurce for work described in Section I herein, and that funding is withdra.wn, reduced or lunited in any way, or the project is cancelled or substantially reduced after the execution date of this Agreement and prior to the completion of the work, the City may summarily termmate this Ageement A. Excusable Dela s: The right of Consultant to proceed shall not be terminated nor sha11 Consultant be chazged wrth liquidated damages for an.y delays in the completion of the work due to: 1) any acts of the federai government in controlling, restncting, or requisitioning materials, equipment, tools, or labor by reason of war, national defense, or other national emergency; 2) any acts of the City, its consultants, or other public agencies caus2ng such delay, and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God, fires, floods, strikes, or weather of unusual severity PROVIDED, HOWEVER, that the Consultant must promptly not�fy the Crty withui ten {10) calendar days m writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement, the delay is properly excusable, the City shall, in wnting, extend the time for completing the work for a period of time commensurate with the period of excusable delay. B Ri�hts Upon Ternvnation In the event of ternunation, the City sha11 pay for all services performed by the Consultant to the effective date of terminahon, as described on a finai invoice submitted to the City. After termination, the City may take possession of all records and data within the Consultant's possession pertauung to this pro,Ject which may be used by the City without restriction. Any such use not related to the project which Consultant was contracted to perform shall be without liabihty or legal exposure to the Consultant CITY OF BRENIERTON CONSULTANT � : ��`���7 �, �f�� - , ��, , . �. - � st: City Clerk Bremerton/AECOM Gorst Creek Watershed Comprehensive Plan Page 6 of 6 Approved as to form: �" I Bremerton ity Attorney EXHIBIT A— SCOPE OF WORK City of Bremerton Gorst Creek Watershed Comprehensive Plan BACKGROUND Specific components of the work for the period of th�s contract include • Task O1 Watershed Characterizat�on • Task 02Land Use Plan and Development Regulat�ons • Task 03 Planned Action EIS • Task 04 Stormwater Plan • Task OS Cap�tal Improvement and Corrective Action Plan • Task 060utreach and Informatton Transfer Each task is described m detail below mcludmg ob�ective, activrt�es, assumptions, and deliverables specific to each task Pro�ect management will be performed wrthin each task by the Pro�ect Manager (PM) and mdividual Task Leads The Pro�ect Manager w�ll also manage the overall pro�ect includmg scope, schedule, and budget Task 01 — Watershed Characterization The purpose of the Watershed Character�zation (WC) �s to develop mformation to support the Land Use Plan, Environmental Impact Statement (EIS), Stormwater Plan, and Cap�tal Improvement Plan (CIP) for the Gorst Watershed AECOM will perform limrted HSPF modelmg for stortnwater management plannmg and partic►patmg in �ncorporatmg characterizat�on results m plans and policies (land use, stormwater, transportation, and landfill), using the existmg Final WC AECOM will perform modelmg with assistance from EPA to optimize stormwater BMPs w�thm the basin Approacb AECOM will provide GIS and technical assistance along with EPA and Ecology for modelmg the Gorst Watershed as requested on a t�me and materials basis Task Roles and Respons�bilities Ecology (Stephen Stanley, Ecology Lead) characterization will assist w�th HSPF modelmg based on the existmg Watershed Character�zation Report City (David Tanner, Crty Lead) Provide GIS data layers for C�ty ut�lrt�es - stormwater, water/wastewater, roads, other utilrties, assist with HSPF and SUSTAIN modelmg for stormwater management plannmg, participate m mcorporating characterization results m plans and policies (land use, stormwater, transportatton, landfill) Ciry of Bremerton l.?3-1896-096 Scope of Work 1 June 2012 Corst Creek Watershed Comprehens�ve Plan ,� • Kitsap County provtde GIS data from K�tsap County nearshore assessment, local hab�tat assessment, and other relevant County planning efforts, participate �n mcorporatmg character�zation results mto land use plans and pol�c�es ' • EPA (Dmo Marchellonus) w�ll assist with SUSTAIN modelmg efforts based on the existtng Watershed Character�zation Report Subtask 1.1 —HSPF and SUSTAIN Modeling Activities AECOM will assist EPA and Ecology with data collection and �nterpretation of the HSPF and SUSTAIN models Tasks may mclude • HSPF model setup and coord�nation with SUSTAIN modelmg • Calibration of HSPF model • Draft Techn�cal Memorandum (TM) descnbmg cal�bration and results • Final TM following C�ty and rev�ew of draft • GIS support for evaluat�on and mterpretat�on of relevant characterist�cs to support the hydrologic evaluation of the Gorst Watershed as d�rected by the C�ty (the purpose of th�s work is to prov�de GIS services to support model�ng efforts for the Gorst Watershed Characterizat�on Report due to model deficiencies caused by EPA software failure) Assumptions • AECOM w�ll lead HSPF modelmg efforts, sub�ect to ex�st�ng budgets • AECOM wtll lead SUSTAIN modelmg efforts, sub�ect to exist�ng budgets • Consultant shall comp�le the GIS data layer(s) for the stormwater pipe system, data to be suffic�ent for use in the SUSTAIN model Information may mclude p�pe locat�ons, d�ameters, mvert elevat�ons, and slope • Consultant shall help coord�nate HSPF modelmg and SUSTAIN modelmg w�th EPA and Ecology to produce the outputs needed for the LUP/stormwater/CIP tasks • Consultant shall prov�de the followmg GIS data layers to be used w�th HSPF and SUSTAIN Gorst watershed boundary, land use, digrtal elevatton model, and stream network • Consultant shall develop GIS data layers for Gorst sub-liasin boundaries, based on mformat�on prov�ded by the City • Wrth the except�on of the GIS support for the Watershed Characterizat�on Report, the Task 1 2 achvrttes will be performed concurrent wrth Task 4 • No changes are requ�red of the Quality Assurance Pro�ect Plan (QAPP) for the SUSTAIN model which was submitted to EPA by the C�ty in 2011 De/iverab/es Crty of Bremerton 233-1896-096 Scope of Work 2 June 2012 Gorst Creek Watershed Comprehensrve Plan The followmg del�verables w�ll be submitted under this subtask • GIS support and assoc�ated documentat�on for the Watershed Character�zat�on Report • Draft TM describ�ng model cal�brat�on and results • Final TM w�th cal�brated HSPF model Subtask 1.2 — SUSTAIN Model All tasks are incorporated under Subtask 1 1 TASK 02 — LAND USE PLAN AND DEVELOPMENT REGULATIONS The C�ty of Bremerton des�res a comprehens�ve plan for the Gorst Creek Watershed that prov�des land use pohcies and regulations reflecting a sc�ence-based approach to watershed ecolog�cal funct�ons and hab�tat protection Based on the watershed character�zation study, stormwater and cap�tal facility constra�nts and opportunities, ava�lable markedeconom�c �nformation, as well as the outreach and mformat�on transfer program The C�ty of Bremerton will support the Consultant team as the lead respons�ble for developmg a land use plan The Consultant team shall support the C�ty of Bremerton m the development of land use regulations to �dentify su�table areas for growth as well as areas for protect�on and conservat�on The Consultant's tasks will include develop�ng land use strategies, leadmg the communtty v�sionmg effort, develop�ng land use alternat�ves and a preferred alternative, develop�ng a comprehens�ve plan, and supportmg development of a zonmg ordinance Consultant role will be to facilrtate �nternal team workshops generatmg princ�ples and range of land use concepts, prepare pol�cy papers on key top�cs, prepare GIS maps of land use alternat�ves, and peer review City draft plans and regulat�ons Consultant w�ll support the C�ty at public outreach and legislat�ve meetmgs as appropnate Subtask 2.1 — Develop Project Outline Objective • Assess poss�ble future development allowed by the code, and appropriate organ�zat�on and top�cs for future regulat�ons Activities The followmg act�v�t�es will be conducted by Consultant as part of this subtask • Rev�ew City and County plans and codes • Develop a plan and regulatory outlme for rev�ew by the C�ty and County De/iverables The followmg deliverables w�ll be subm�tted under th�s subtask Plan and regulatory outlme City of Bremerton ` 233-1896-096 Scope of Work 3 June 20/2 Gorst Creek Watershed Comprehensrve Plan Subtask 2.2 — Land Use, Environmental, and Infrastructure Analysis Objective Lmk watershed characterization and mfrastructure analysis to land use plannmg efforts, develop land capac�ty and urban growth boundary data, and prov�de a basis for preparation of guidmg principles and development of commun►ty vis�ons towards the land use plan Activities The followmg activit�es will be conducted as part of th�s subtask • Review the watershed characterizatton (Task 1) and stormwater and facility �nventones, opportumttes, and constramts (Tasks 4 and 5) • Prepare a single whrte paper that addresses the followmg topics 1 Summary of key findmgs of the watershed characterization and mfrastructure studies 2 Land capac�ty analys�s for areas determmed developable �n the watershed Comparison of UGA boundaries to the watershed subareas determmed surtable for development, consistency analys�s w�th County and City plans, and recommendations for plan and EIS study area boundaries 4 Recommendat�ons for land use strategtes mcludmg conceptual permit pathways and performance standards for d�fferent areas of the watershed Consultant will prov�de GIS services consistent wrth local land capac�ty approach The Consultant will prepare a final wh�te paper follow�ng C�ty, County, and other partner agency reviews Assumptioas See Task 2 General Assumptions De/iverab/es The followmg dehverables will be submitted under th�s subtask Whtte paper addressing topics outlmed above Subtask 2.3 — Land Use Concepts and Regulations Objective To develop land use concepts and regulat�ons that will serve as a basis for the subarea plan and for testmg alternatives m the EIS To educate residents and property owners about the watershed and land use plannmg effort, provide gwdmg pr�nc�ples for commun�ty review obtam commun�ty visions for the future of the area, prepare a range of land use concepts that �llustrate different potent�al pathways to achieve the vision for the subarea, and support land use concepts wrth policy statements Crry of Bremerton 233-1896-096 Scope of Work 4 June 2012 Gorst Creek Watershed Comprehensrve Plan Activ�ties The follow�ng activities will be conducted as part of th�s subtask • Consultant shall conduct a publ�c "Community V�s�on�ng" workshop to �ntroduce the pro�ect and to affir►n and mod�fy guidmg prmc�ples Consultant shall lead a charette style meetmg for C�ty, County, and other agency partners to bramstorm two land use concepts that meet gu�dmg pr�nciples and commun�ty v�sion statements Consultant will prepare base maps for the charette, and, followmg the charette, will prepare maps of land use concepts Consultant, C�ty and the County will prepare coord�nated draft plan polic�es and regulat�ons To support the process, Consultant will prepare a pol�cy memo address�ng sustamable development tools and flexible development standards (e g, he�ght or dens�ty bonuses, transfer of development r�ghts (TDR) options and other mcentives to achieve watershed goals • Consultant shall prepare a draft pol�cy memo that descr�bes each alternat�ve land use concept The City w�ll peer review �t Deliverab/es The follow�ng delrverables will be subm�tted under th�s subtask • Final Gu�dmg Princ�ples � Base maps for the charette and maps of land use concepts • Policy memo address�ng susta�nable development tools and flex�ble development standards • Draft policy memo descnbmg each alternative land use concept Subtask 2.4 — Preferred Alternative/Proposed Plan Objechve Follow�ng publ�c review of draft alternatives, use publ�c and decis�on-maker mput to craft a preferred alternat�ve and proposed plan Develop a preferred land use concept around wh�ch a plan can be developed Based on the preferred land use concept and mput on draft plan(s), develop refined pol�c�es and regulations Create a"hearmg draft" of the plan (draft to present to the County Comm�ss�oners, and C�ty Council) that mcludes policies and regulat�ons Activities The followmg act�vit�es w�ll be conducted as part of th�s subtask • Followmg the publicat�on of the draft EIS and �ts findmgs, the Consultant, with support by the City and County, w�ll develop a preferred alternahve that �s in the range of the EIS alternat�ves through facilttation of an mternal team charette C�ty and County w�ll peer review the proposed C�ry of Bremerton 2.?3-1896-096 Scope of Work S June 2012 Gorst Creek Watershed Comprehensrve Plan plan and regulat�on documents Consultant shall present the preferred alternative at a workshop �omtly attended by the City and County For the preferred alternative, Consultant shall lead the preparation of associated pol�cies and regulations, amendmg the prior draft plan C�ty and County will peer rev�ew • Consultant shall lead a publ�c workshop attended by the County and C�ty to present the preferred alternative to a �omt C�ty-County legislat�ve workshop Consultant shall provide refinements to the preferred alternatrve as rt is prepared for hearmgs • Consultant shall addrtionally attend a meetu�g of the Bremerton Plannmg Commission to present the draft policies and regulations Follow,�ng the leg�slat�ve workshop, Consultant shall revise the preferred alternat�ve plan, polic�es and regulattons The C�ty and County will peer review De/iverab/es The followmg deliverables will be submitted under th�s subtask • Proposed preferred plan • Alternat�ve GIS maps • Proposed preferred policies and regulations • Revisions of preferred alternative plan, policies, and regulations Subtask 2.5 — Adoption Process Ob�ective Shepherd the draft, preferred, and hear�ng-draft land use concepts, policies, and regulations through a public review process Activities The followmg activ�t�es will be conducted as part of this subtask • Hearmg Consultant shall provide GIS services to prepare maps for the hear►ng draft, and will prepare the draft with assistance from the City and County Consultant shall prov�de up to two one-staff persons to support the City and County at up to one public meet�ng during the adoption process The City will present the hearmg draft plan • Adv�sory Committee Meet�ngs Consultant shall attend up to four adv�sory committee meetmgs related to the draft plan Consultant's role w�ll be to assist m preparmg presentat�ons and to be ava�lable as a resource for questions The City will take the lead on the meeting preparation, facil�tation, and other logist�cs Crry of Bremerton 233-1896-096 Scope of Work 6 June 2012 Gorst Creek Watershed Comprehensrve Plan } � Assumptions • Publ�c Hearmg Consultant shall provide up to four GIS drawings for the public hearmg • Advisory Comm�ttee Consultant role mcludes support to prepare materials and attend meetmgs — which are listed under Tasks 2 1 to 2 5 above DeJiverables • Draft/F�nal Land Use Plan • Draft/Final Development Regulations Task 02 General Assumptions and Summary of Deliverables The followmg general assumpt�ons apply to Task 2 as a whole • Consultant �s lead for land use plan and regulations, m consultat�on wrth Ctty and County • Consultant will develop plan and regulatory outl�ne, draft plan and regulations, and preferred plan and regulat�ons C�ty will peer rev�ew and prov�de final regulat�ons • Consultant will support the City at up to 4 public outreach meet�ngs The followmg del�verables apply to Task 2 as a whole • Land Use Plan and Regulatory Outlme • Consultant prepared wh�te paper w�th findmgs of Watershed Character�zat�on and Infrastructure Analysis and analysis of land capac�ty, UGA boundartes, and performance standards for watershed • Consu(tant prepared GIS maps of three draft (one is no-action) and one preferred land use concepts (Comprehensive Plan and zonmg for County and C�ty) • Consultant attendance at one commun�ty v�sion�ng wor(cshop, one leg�slat�ve workshop, and one Planning Comm�ss�on Meetmg • Consultant attendance at one team workshop • Consultant attendance at one public meetmg during adopt�on process • Attendance at up to four adv�sory comm�ttee meetir►gs durmg adoption process • Draft Land Use Plan will mclude 3 alternatives �ncluding a No-Action alternative • Final Land Use Plan • Draft Development Regulations • Consultant Peer review comments on Final Development Regulations Crry of Bremerton 233-/896-096 Scope of Work 7 June 2012 Gorst Creek Watershed Comprehensrve Plan TASK 03 — PLANNED ACTION EIS The Crty wants to promote sustamable development m a streamlined manner with a planned act�on programmatic EIS ("planned action" for the areas mside the Urban Growth Area {UGA} consistent wrth WAC 197-11-164 and "programmatic" for the watershed outs�de of the UGA) For Gorst, the EIS is an opportunrty to • Facilrtate decision-maker revtew of the Gorst Watershed Plan by testmg a range of plan, policy and regulation alternat�ves for environmental protection, land use, and supportmg mfrastructure, • Integrate past County and City stud�es w�th supplemental analys�s for the EIS mto a smgle document, and • Plan m advance for the expected growth and development, and streamline future permittmg Subtask 3.1 — EIS Initiation Objective � Collect data and set gu�dance for document contents Activihes Based on a data needs l�st developed by the Consultant team, coordmate with Crty and County to collect professional lrterature and data pertinent to EIS tasks and confirm the level of technical anatysis appropriate to the EIS Review matenals m preparation for EIS analys�s, conduct any limited area vis�ts Prepare an EIS guidance memo that u►cludes document approach, outlme, and document template Assumptions See Task 3 General Assumpt�ons Deliverables The followmg deliverables will be subm�tted under this subtask • Data needs list • EIS guidance memo that mcludes document approach, outlme, and document template Subtask 3.2 — Plan Alternatives and EIS Scoping Objectrve Scope a range of alternatives and determme appropr�ate EIS topics Activities Consultant shall assume the lead role m preparation of a SEPA Checkl�st and assoc�ated documents to provide a broad and brief environmental review, describe the rationale for topics to be addressed m the EIS, develop description of two action alternatives, mcludmg the no-action alternative, and conduct a scopmg meetmg Specific steps include Crry of Bremerton 233-1896-096 Scope of Work 8 June 1011 Gorst Creek Watershed Comprehensrve Plan • Prov�de draft and final SEPA checklist � • Ass�st City m preparation of a draft and final DS and Scopmg Not�ce • Prepare presentation and support staff at �o�nt legislat�ve meetmg to confirm draft EIS scope and alternatives • Develop and describe alternat�ves for mclus�on m the EIS, mcludmg prototype concepts • Lead a public Scopmg Meetmg Assumptioas See Task 3 General Assumptions Debverab/es The followmg del�verables will be subm�tted under th�s subtask • Prov�de SEPA Checkl�st, DS, and Scoping Notice • Prepare presentat�on on draft EIS scope and alternatives • Develop and describe alternatives for inclusion �n EIS Subtask 3.3 — Preliminary Draft Planned Action/Programmatic EIS Objective Prepare an EIS wh�ch addresses general sections, geology/soils, water resources, air quality, plants and an�mals, environmental health (mclud�ng no�se and hazardous matenals), land use patterns, plans and pol�cies, soc�oeconomws, esthet�cs (mcludmg light and glare), cultural resources, transportatton, and public services and utilittes Act�vities Prepare a prelimmary draft EIS for City rev�ew and comment The approach to each top�c is described below • General Sect�ons Prepare the Fact Sheet, table of contents, distribution list, appendices and other necessary supportmg documentat�on • Geology/Soils Include a descr�ptwn of the study area geology, soil types, and known and mapped hazards based on ava�lable lrterature and previous development studies Describe general r�sks assoc�ated wrth geologic hazards, expected constructab�lity grven soil condrtions, and the degree and nature of potential �mpacts that could result from alternatives The ab�lity of adopted regulations and codes to serve as mrtigat�on measures will be described, e g critical areas, gradmg, and build�ng codes, together with any proposed land use plan regulations Cety of Bremerton 233-1896-096 Scope of Work 9 June 2011 Gorst Creek Watershed Comprehensrve Plan • Water Resources Based on the watershed character�zat�on and stormwater planning (Tasks 1 and 4), address surface water and groundwater existmg conditions and potential future cond�tions based on the area developmg and complymg with proposed land use plan regulations • A�r Qualrty Identify how new development and assoc�ated traffic could affect air em�ssions, mcludmg greenhouse gases Summarize existmg air quality cond�tions and compare City and reg�onal transportation plans and growth levels and potent�al Vehicle M�les Traveled (VMT) by alternat�ve based on the transportation model Prepare a focused review of greenhouse gas emiss�ons usmg the King County greenhouse gas method Modify the Kmg County worksheet recognizmg federal CAFE standards Review worksheet assumpt�ons regarding vehicle use in l�ght of the EIS traffic analysis results and consider VMT by square footage by category and determme �f ad�ustments need to be made Ident�fy proposed pol�cy or code provisions that would serve as mitigation measures • Plants and Animals Based on the watershed characterization in Task 1, describe the existmg conditions for wildlife habrtat, habrtat features, and potent�al use by federal- or state-listed threatened, endangered, candidate, or prior�ty species Assess the potential for watershed protection and land use standards to reduce impacts Noise Descr�be the overall no�se character of the study area Prepare a narrative that describes the existmg amb�ent noise levels and potential increases m no�se levels due to mcreases m all forms of transportat�on — atrport, tra�ns, trucks, and other veh�cles For vehicular noise, use traffic model output and mterpolate existmg and future volumes and input the volumes �nto the TM model to compare noise levels along ma�or routes No field measurements vv�ll be performed Mrt�gation measures such as setbacks, buildmg and energy codes and airport noise abatement practices will be descr�bed • Hazardous Mater�als Provide an overview of the types of contaminants l�kely to be encountered due to the landfill and due to commerc�al and �ndustrial operations and determme whether any of the alternatives would affect the likelihood of human exposure to toxics or other env�ronmental r�sks • Land Use Patterns/Plans and Polic�es Compare and evaluate the proposed amount, types, scale and pattern of uses under each alternahve m companson wtth the exist�ng land use pattern Evaluate the alternattves for consistency w�th state, regional, countywide, and city plans and pol�c�es includmg Growth Management Act Goals, Vision 2040, Kitsap County Countywide Plannmg Pol�cies, and the C�ty of Bremerton and Krtsap County Comprehensive Plans • Socio-economics Prepare a summary of current housing and employment cond�tions, market- based trends for housmg and employment uses, and land capacity for growth under different alternat�ves • Aesthetics Describe the overall aesthet�c character of the study area m terms of the qualrty of the environment, the design and character of existmg buildmgs, and bu�ldmg he�ght, bulk and scale Evaluate the nature and magn�tude of change envisioned by the land use plan, considermg the proposed land use and bu�idmg form regulanons • Cultural Resources Address existmg condrtions and potenhal future condrtions based on the area redevelopmg and complymg with local, state, and federal regulat�ons Document a lrterature search If needed, l�mrted locations will be reviewed m the field at a reconnaissance level There will be no shovel probmg or excavation associated with this analysis Contact will be made with local tribes in con�unctton with the City, to help �dentify any Tradrtional Cultural Properties Crty of Bremerton 233-1896-096 Scope of Work 10 June 2012 Gorst Creek Watershed Comprehensrve Plan located wrthm the pro�ect area Information gatt►ered from the srte v�srt and tr�bal consultation will be mcluded m the EIS • Transportat�on Review of ex�stmg levels of serv�ce, and adaptmg ex�stmg traffic models developed for the Bremerton area, review estimated needs, transportat�on demand, and pro�ected levels of service under each land use alternative Transportat�on analys�s w�ll be based on the transportat�on mformahon developed m the caprtal improvement program (Task 5) This topic w�ll �nclude the following subtasks performed by City staff with peer review by the Consultant ➢ Obtam and summarize exist�ng traffic mformat�on for the Gorst UGA mcludmg mformat�on from WSDOT, Kitsap County and the Crty of Bremerton ➢ Prepare a prelimmary transportation analysis TM that summar�zes the follow�ng transportat�on mformation m the Gorst UGA, classification of existmg transportat�on mfrastructure, LOS for arterials and ma�or collectors, proposed capital improvement pro�ects for arter�als and collectors, and currently �dent�fied regwnal transportat►on �nrtiatives that are located w�th�n or ad�acent to the Gorst UGA ➢ Prepare land use assumpt�ons for alternat�ves to test m County run model (Consultant prepare growth assumpt�ons, County run transportat�on model) ➢ Prepare a qualrtattve analysis of potential future (LOS) requtrements m the Gorst UGA for the no action and up to two addit�onal land use alternat�ves ➢ Identify necessary transportation capital pro�ects for arter�als and ma�or collectors m the Gorst UGA, prepare associated budget level cost estimates, and �dent�fy potential funding sources ➢ Prepare a draft Gorst UGA Transportat�on Analysis TM that summarizes mformat�on from the prel�mmary traffic analys�s, the LOS analys�s, and the l�st of caprta( pro�ects ➢ Prepare a final Gorst UGA Transportation Analysis TM • Public Services and Utilrt�es Review ex�stmg levels of serv�ce, estimated needs and demand for service, and pro�ected levels of serv�ce under each alternat�ve for police and fire protect�on, water, wastewater, stormwater, and sol�d waste The ut�lities analysis will be based on the stormwater plan (Task 4) and capital improvement program (Task 5) • Meet with City and County staff to review comments on the Prelimmary Draft EIS Prepare a presentation of key findings and support City and County at a meetmg with legis(ative bodies to rev�ew a prelim�nary draft summary of the EIS Assumptions See Task 3 General Assumpt�ons and the followmg • Ex�stmg mformation to be used m the City-lead traffic analys�s will consist of the followmg ➢ Bremerton Econom�c Development Study (WSDOT 2010), Crry of Bremerton 233-1896-096 Scope of Work / 1 June 2012 Corst Creek Watershed Comprehensive Plan � r ➢ Bremerton-Gorst Design Report and EIS (Parametr�x 1996), ➢ Kitsap County Comprehens�ve Plan EIS (IC�tsap County 2006), ➢ Results of Kitsap County Remand Revisions will be mcorporated as wr�tten for the Gorst area (Krtsap County 2012) • Two Consultant staff w�ll attend up to two 2-hour meetmgs w�th the City or Stakeholders De/iverab/es The followmg dehverables w�ll be submitted under this subtask • Prel�mmary Draft EIS • Prepare presentat�on on key findmgs from Draft EIS • Draft and Final Transportation Analysis Tech Memo Subtask 3.4 — Draft Planned Action/Programmatic EIS Objective Prepare a public review draft EIS followmg incorporation of City comments Activit�es Based on C�ty comments on the prelimmary Draft EIS, prepare a Draft EIS for public review Durmg the publ�c comment period, support City staff at one publ►c meetmg on the Draft EIS Assumptiovs See Task 3 General Assumpt�ons, w�th the add�tion that we will rev�se the document based on a smgle-set of consol�dated comments from the cl�ent Deliverab/es • Draft EIS for public rev�ew Subtask 3.5 — Final EIS Objechve Prepare a Final EIS Achvities Compile a Final EIS that mcludes a fact sheet, table of contents, Draft EIS corrections (as needed), and responses to comments on the Draft EIS Assumptions See Task 3 General Assumptions Crry of Bremerton 133-1896-096 Scope of Work 12 June 1012 Corst Creek Watershed Comprehensrve Plan DeLverables The followmg dehverables w►I1 be submitted under this subtask • Final EIS, mcluding responses to comments on Draft EIS Subtask 3.6 — Planned Action Ordinance Objective Fac►lrtate future development consistent wrth the EIS alternat�ves and analysis through a Planned Action Ordmance Activities Review the City-prepared draft ordmance that designates the Planned Action for the Gorst UGA Per WAC 197-11-168, the ordinance w�ll describe the types of pro�ect action bemg des�gnated as a planned action, descr�be how the pianned act�on meets the crrteria m WAC 197-11-164, mclude a findmg related to adequacy of the Planned Action EIS (that environmental �mpacts of the planned act�on have been ident�fied and adequately addressed m the Planned Act�on EIS), and ident�fy any specific mrtiganng measures required to qualify future pro�ects as planned acttons Develop a planned actton admmistrat�ve gu�dance paper to ass�st wrth the implementahon of the Planned Action Ordmance Include a statement of the specific cr�teria for qual�ficat�on as a planned action, a flow chart of the deciston-making and review process for proposed planned actions, and a momtonng system to track mitigation and development under the Planned Action Ordinance Attend publ�c hearmg on the Planned Actton Ord�nance (may be the same or d�fferent than the Draft EIS meetmg m Task 3 4) Consultant shall assist the C�ty m preparat�on of a draft ord�nance that designates the Planned Act�on for the Gorst UGA Consultant shall also develop a planned action adm�nistrative guidance paper to ass�st with the implementarion of the Planned Action Ordmance The paper will mclude a statement of the specific cr�ter�a for qualificat�on as a planned act�on, a flow chart of the dec�sion-mak�ng and review process for proposed planned actions, and a monitormg system to track m►t�gation and development under the Planned Action Ord►nance Assumptions See Task 3 General Assumpt�ons DeLverab/es The followmg del�verables w�ll be submitted under th�s subtask • Planned act�on ordmance • Admmistrative guidance paper Crty of Bremerton 233-1896-096 Scope of Work 13 June 2012 Gorst Creek Watershed Comprehens�ve Plan , Task 03 General Assumptions and Deliverables Assumphons i The follow�ng assumpt�ons apply • The EIS will be based on exist�ng �nformation and mformation developed for the Watershed Character�zation — for water resources, geology/so�ls, plants and ammals, and land use • City will prov�de one set of essenhally consolidated comments on each prel�mmary or draft deliverable • All Consultant deliverables will be electronic (no hard copies of draft or final deLverables will be produced by the Consultant) • City will publish Determmation of Sigmficance and Scopmg Notice and all other SEPA notices and documents • Crty w�ll provide up to two staff inembers to support the scopmg meetmg and public hearmg • City will schedule and arrange venues for the EIS scopmg meetmg, DEIS comment meetmg, and pubhc hearmg • Consultant will manage and respond to up to 20 un�que comments on the DEIS City and County to assist with respond�ng to non-technical EIS comments � Consultant shall conduct no field measurements for noise analysis and reconna�ssance-level field work for cultural resources analysis (no shovel prob�ng or excavation) • Consultant shall provide up to two staff members at each of three public meetmgs the scopmg meetmg, one legislat�ve meetuig, and the DEIS publ�c comment meetmg • Consultant shall provide one staff inember to support the public hearmg for the Planned Action Ordinance (�f separate from DEIS publ�c comment meetmg) De/iverables The followmg deliverables will be submitted under this subtask • Data needs l�st • EIS gu�dance memo that mcludes document approach, outline, and document template • Draft SEPA Checkl�st • Final SEPA Checklist � Consultant-prepared Draft and Final Determmahon of Sign�ficance and Scopmg Notice for City to publish • Boards and handouts for public scopmg meetmg and attendance of up to two Consultant team members at the scoping meetmg • Preliminary Draft EIS • Draft EIS • Peer rev�ew of City-prepared Notice of Availabil�ty of Draft EIS for City to publish Crry of Bremerton 233-1896-096 Scope of Work 14 June 2012 Gorst Creek Watershed Comprehensrve Plan • Boards and handouts for one public meetmg durmg the public comment period and attendance of up to two Consultant team members at this meetmg • Prelimmary Final EIS • Final EIS • Peer rev�ew of City-prepared Notice of Ava�labil�ty of Final EIS for City to publ�sh • Peer rev�ew of City-prepared Draft Planned action ordinance and Consultant preparation of Draft admmistrative guidance paper • Peer review of City-prepared Final planned action ordmance and Consultant preparation of Final administrat�ve guidance paper • Attendance of one Consultant team member at one public hearmg on the Planned Actton Ordmance �f separate from Draft EIS hearmg TASK 04 — STORMWATER PLAN The obJect�ve of the Stormwater Plan �s to prtorrtize ex�stmg surface water issues, identify corrections necessary for existing problems, and define system improvements necessary for future development withm the watershed The plan will include strateg�es and actions that address the key pro�ect priorrt�es and outcomes, infrastructure and policies that prov�de for sustamable growth and reduce eros�on, pollutant loadmg, floodplam alterat�on, and reduction of aquifer recharge Th�s plannmg will rely heav�ly on stormwater modelmg performed m the watershed character�zation and expanded under Task 4 Results of modeling will form the basis of LID evaluation and methodolog�es for stor►nwater plamm�g solutions The Stormwater Plan is bemg prepared to priorrt�ze existmg surface water issues, ident�fy correcttons necessary for existing problems, and define system improvements necessary for future development w�thm the watershed Subtask 4.1 — Existing Conditions and Deficiencies Technical Memorandum Objechve Obtain and summar�ze ex�stmg mformat�on on stormwater condrt�ons m the pro�ect area and identify ex�stmg stormwater infrastructure deficiencies Activihes AECOM w�ll assume the lead role m delivermg all work under this task Addrtional mcludes mcorparat�on of the HSPF and SUSTAIN model results mto the mventory and baselme cond�tions mcludmg • Obtam, review and summar�ze mformation from Krtsap County Surface and Stormwater Management (SSWM) program on outfall locat�on/type/condition, stormwater facilrties, and complamts and request for service records • Develop a techn�cal memorandum listmg and mappmg known existmg storm defictencies Cery of Bremerton 233-1896-096 Scope of Work 1 S June 2012 Gorst Creek Watershed Comprehensrve Plan a Assumptions The task budget is based on the followmg assumptions • The TM will include the followmg figures existmg stormwater mfrastructure for the Gorst UGA, existmg stormwater mfrastructure for the Gorst watershed, location of �dentified stormwater deficiencies • Rankmg criter�a will be based on Krtsap County SSWM rank�ng criteria • TM will be organ�zed mto separate sections, one for the Gorst UGA and one for the rest of the pro�ect area Deliverab/es The followmg deliverables will be submitted under th►s subtask • Existmg Condrt�ons and Defic�enc►es TM • List and map of known ex�stmg storm deficiencies • Priorrt�zation crrteria for rankmg deficiencies and review wrth City • Draft TM for rev�ew wrth City • F�nal TM based on C�ty comments • Preparation and attendance at up to two meet�ngs, one to discuss the l�st of known deficienc�es, and one to d�scuss comments on the draft TM Subtask 4.2 — Programmatic Stormwater Management Alternatives Technical Memorandum Objechve Identify and describe alternat�ves for programmat�c stormwater management and regulation m the Gorst UGA Activities The followmg activrties will be conducted as part of th�s subtask • Prepare a prelimmary descriptton of stormwater management goals, ob�ectives and regulatory policies • Summarize NPDES compliance issues associated with the Gorst UGA • Prepare up to two alternative approaches for stormwater management and regulation m the Gorst UGA Evaluate each alternative relative to the followmg crrteria Crty ojBremerton 233-1896-096 Scope oJ Work 16 June 2012 Gorst Creek Watershed Comprehensrve Plan ➢ Extent to wh�ch ex�stmg problems are addressed and corrected, mcludmg extent to which stream funct�ons are restored, and extent to which water yual�ty will be �mproved ➢ Regulatory framework and gaps ➢ Implementation, monitormg and enforcement ➢ Implementation costs • Based on the outcome of the alternatives analysis, prepare prelim�nary development standards for the preferred opt�on • Prepare a Draft TM and review with C�ty • Prepare Final TM based on C�ty comments • Preparat�on and attendance at up to two meetu►gs, one to d�scuss prel�mmary development standard alternat�ves, and one to discuss comments on the draft TM Assumptions The task budget is based on the followmg assumptions • Alternatives will consist of a status quo opt�on whereby existmg standards are used m the pro�ect area, and one addrtional opt►on that mcludes �ncorporatmg LID techn�ques �n all new development and redevelopment • The TM w�ll be organ�zed mto separate sect�ons, one for the Gorst UGA and one for the rest of the basin • Development standards will cons�st of two opt�ons appl�cation of ex�sting standards and guidel�nes, and development of specific standards for LID techn�ques m the Gorst UGA • Development standards addressed wrthm this task will be I�mited to general standards for how and where stormwater related LID techn�ques are to be applied to new development and redevelopment withm the Gorst UGA No new LID engmeenng or des�gn standards are mcluded m this scope and rt �s assumed that LID techn�cal mformahon contamed m the Krtsap County LID Guidance Manual will be adopted by reference • The SUSTAIN model prepared by EPA and HSPF Model prepared by Ecology under Task 1 will provide all the specific mformat�on and mappmg needed to determine locations of specific LID BMPs and no addrtional LID location mformat�on will be necessary • Code and/or ordmance development and adoption will be performed by the City Deliverables The followmg del�verables will be submitted under th�s subtask • Prepare a prelimmary descr�ption of stormwater management goals, ob�ectives and regulatory pol�cies • Summarize NPDES compliance issues associated wrth the Gorst UGA • Prepare up to two alternative approaches for stormwater management and regulation m the Gorst UGA Crry of Bremerton 233-1896-096 Scope of Work 17 June 20/2 Gorst Creek Watershed Comprehensrve Plan • Based on the outcome of the alternat�ves analys�s, prepare prelim�nary development standards for the preferred option • Prepare a Draft and final TM • Preparation and attendance at up to two meetmgs, one to d�scuss prel�mmary development standard alternatives, and one to discuss comments on the Draft TM Subtask 4.3 — Draft and Final Stormwater Plan Objective Prepare the draft and final Stormwater Plan for the pro�ect area Activities Consultant will assume the lead role m mcorporatmg results of the modelmg �nto the Stormwater Plan The followmg activit�es will be conducted as part of th�s subtask • Prepare a Draft Stormwater Plan based on the �nformat�on prepared m Tasks 4 1, 4 2 and 4 3, the SUSTAIN Model and Watershed Ana(ys�s prepared as part of Task 1, and the Stormwater Corrective Act�on TM developed m Task 5 1 • Review the draft plan wtth C�ty and prepare a Final Plan based on C�ty comments • Preparatton and attendance at one meetmg to discuss comments on the draft plan Assumptions The task budget is based on the followmg assumptions • The Stormwater Plan will be organized mto separate sections, one for the Gorst UGA and one for the rest of the bas�n Deliverab/es The followmg dehverables w�ll be subm�tted under this subtask • Draft and Final Stormwater Plan TASK 05 — CAPITAL IMPROVEMENT AND CORRECTIVE ACTION PLAN A caprtal �mprovement and correchve actton plan (CIP/CAP) will be developed to identify and pr�oritize the pro�ects needed to correct ex►stmg defic�enc�es and prov�de necessary mfrastructure to support sustamable development The CIP/CAP will contam elements to restore fish passage, protect wetiands and streams, protect shorehnes and shellfish beds, and improve water quality The CIP/CAP will be a dynam�c document that is developed concurrently with the Land Use Plan The goal of this approach is to provide caprtal pro�ect and cost mformat�on that mforms the land use planning process, and vice versa Consultant will work wrth the City to develop both of the specific caprtal improvement pro�ects, as well as the programmatic �mplementation strategies and development of fundmg opt�ons that are consistent with the City's Comprehensive Plan, the pro�ect goals, and the Crty's (and other partners and stakeholders) expectations Cety of Bremerton 233-1896-096 Scope of Work 18 June 2012 Gorst Creek Watershed Comprehenstve Plan — Stormwater Corrective Actions Technical Memorandum Priorrt�ze stormwater corrective actions based on deficienc�es �dent�fied as part of Subtask 4 1 Activities Consultant will assume the lead role m delivenng th�s subtask which mcludes • Prepare a one-page CIP pro�ect sheet for each �dentified defic�ency that mcludes a text description of the pro�ect, a concept level budget est�mate, and a schemat�c plan • Conduct priorit�zatton rankmg analysis usmg criteria developed m Subtask 4 1 • Identify potential fundmg sources for each identified defic�ency • Prepare a draft TM summariz�ng �denhfied proJects, cost estimates and pr�orrtization analys�s • Meet wrth the Criy to review the draft TM • Prepare a final TM summarizmg pro�ects, cost eshmates and prwrrtization analysis Assumptions The task budget is based on the followmg assumpt�ons • Up to 10 mdividual CIP pro�ects will be evaluated • Consultant staff will attend up to two 2-hour meet�ngs with Stakeholders, one to d�scuss budget level cost estimates, and one to discuss comments on the draft TM • Draft documents will be prov�ded �n electromc (PDF) format, Final TM w�ll be provided m hardcopy (up to 8 cop�es) and electromc formats Deliverables The following dehverables will be submitted under th�s subtask • One-page pro�ect sheets for each CIP item (up to 10 total ) • Draft and final TM � Subtask 5.2 — Land Use Plan CIP Ob�ective Evaluate ex�sting mfrastructure wrthm the watershed and idenhfy mfrastructure caprtal improvement pro�ects necessary to accommodate planned growth The CIP will mclude elements to protect fish passage, wetlands, streams, shorelines, and water quality Activities The following act�vrt�es will be conducted as part of this subtask Ciry of Bremerton 233-1896-096 Scope of Work 19 June 2012 Gorst Creek Watershed Comprehensrve Plan � , . • Prepare a work plan describmg the Level of Service (LOS) analys�s and coordinate wrth the City to confirm goals and expectat�ons for the CIP • Evaluate existmg condrtions and �dent�fy existmg and future LOS requirements m the Gorst UGA for water supply, sanrtary sewer, emergency services, gas, electric, and ut�lrties • Identify potential cap�tal pro�ects, prepare assoc�ated budget level cost estimates, and ident�fy likely fundmg sources for water supply, sanrtary sewer, emergency services, gas, electric, and ut�lities • Using the output from the SUSTAIN and HSPF models, Stormwater Plan and Watershed Assessment, �dent�fy and prioritize proJects that will address ident�fied stream funct�on and water quality defic�enc�es Prioritization cr�teria will mclude the extent to wh�ch ex�sting problems are corrected, extent to which stream funct�ons are restored, and extent to which water quality will be �mproved • Prepare TM summarizmg LOS analysts, stream function and water quality deficienc�es analysis, proposed caprtal pro�ects • Prepare prel�mmary fundmg analysis that identifies proposed fundmg source(s) for cap�tal pro�ects and implementation strateg�es that are cons�stent w�th the Land Use Plan and stakeholder expectat�ons • Develop draft CIP spreadsheet usmg selected pro�ects •� Revtew draft CIP and TM with C�ty • Prepare final CIP spreadsheet usmg selected pro�ects Assumptions The task budget is based on the followmg assumpt�ons • Level of serv�ce analysis for sanitary sewer and water supp(y w�ll be performed by the C�ty • Existmg and future maps of sanrtary sewer and water supply fac�lrt�es will be provtded by the C�ty • The CIP/CAP wtll be developed concurrently with the Land Use Plan under Task 2 • The transportation LOS summary w�ll be prepared as part of Task 2 • Consultant staff will attend up to two 2-hour meetmgs with the City Stakeholders, one to discuss approach for LOS analysis, caprtal proJect identificatton and prel�mmary CIP screenmg, and one to discuss comments on the draft CIP • Draft documents will be provided m electronic (pdfl format, Final TM and CIP will be prov�ded m hardcopy (up to 8 copies) and electronic formats Deliverab/es The followmg deliverables w�ll be subm�tted under this subtask • CIP Work Plan • Budget Level Cost Eshmates • Draft and Final Land Use Plan TM and CIP Cety of Bremerton 233-1896-096 Scope of Work 20 June 20/2 Gorst Creek Watershed Comprehensrve Plan 1 f� ♦ • Ident�fy and priorrtize proJects that will address identified stream funct�on and water qualrty deficienc�es • TM summariz�ng LOS analys�s, stream function and water quality defic�encies analysis, proposed caprtal pro�ects • Preliminary fundmg analysis • Develop Draft CIP spreadsheet usmg selected pro�ects Subtask 5.3 — Landfill Corrective Action Plan Objective Evaluate reasonable alternat�ves and select a preferred approach for landfill cleanup Activities The followmg activities w�ll be conducted as part of this subtask • Coordmate w�th stakeholders to develop pro�ect goals, ob�ect�ves, and approach • Inspect srte and review existmg �nfortnation includmg EPA and Health District srte files • Review prelimmary remedial alternatives prepared by EPA • Coordmate wrth EPA to review of the documents submitted with stakeholders, consol�date review comments, and prepare a final EE/CA report Assumpttoas The task budget �s based on the followmg assumpt�ons • Review EPA prepared mformat�on and advise City on course of act�on • No sample collect�on or survey work will be performed • Consultant staff w�ll attend up to four 4-hour meetmgs with Stakeholders, kick off ineetmg, one addrtional coordmation meetmg wrth stakeholders, review of Prel�mmary Alternat�ves Assessment TM, and review of draft EE/CA De/iverables None Subtask 5.4 — Fish Passage Barrier Preliminary Engineering Objective Inventory and priorrtize fish passage barr�ers wrthm the Gorst Creek watershed and prepare an engmeermg report for conection of the top pr�ority fish passage bamer Activities The followmg act�vrttes will be conducted as part of this subtask Crry of Bremerton 233-1896-096 Scope of Work 21 June 2012 Gorst Creek Watershed Comprehensrve Plan � r� ) • Rev�ew existmg mformation of prev�ously prepared basm-wide barrier mventory and assessment TM and recommend one barrter for further engmeermg evaluation • Prepare a Draft Prelimmary Engmeermg Report for the selected barrier srte based on WDFW des�gn gutdelmes • Based on City review and comment, prepare a final Prelimmaty Engineermg Report for the selected barr�er srte based on WDFW design guidelmes Assumptions The task budget �s based on the followmg assumptions • Review mventory of existing barrier �nformation developed by others and one s�te vis�t • No survey is �ncluded m this scope • Engmeering design will be schematic level Up to two engmeermg sheets will be prepared • Consultant staff will attend up to two 4-hour meetmgs wrth the C�ty, one to discuss the basm w�de �nventory TM, and one to discuss comments on the draft Prel�mmary Engmeermg Report • Draft documents will be provided m electromc (pd� format, Final CIP w�ll be provided �n hardcopy (up to 8 cop�es) and electronic formats Deliverables The followmg delrverables will be submitted under th�s subtask • Final summary bas�n-wide barrier mventory and assessment TM • Draft and final Prel�mmary Eng�neer�ng Report Subtask 5.5 — Summary CIP Objechve Summar�ze mformat�on developed under Task 5 m spreadsheet format AECOM w�ll take the lead role �n draftmg the CIP Summary The C�ty's role is limrted to review and comment Activitres The followmg activities will be conducted as part of this subtask • Prepare a draft CIP summary m spreadsheet format that presents the results of work performed under Task 5 The spreadsheet w�ll describe and organ�ze the CIP accordmg to mfrastructure component and will provide a descr�ptton of proposed fundmg source • Review the draft CIP with C�ty and prepare a Final CIP based on City comments Assumptlons The task budget is based on the followmg assumptions • Consultant staff w�ll attend one 2-hour meetmg w►th Stakeholders to d�scuss comments on the draft plan C�ry of Bremerton 233-1896-096 Scope of Work 22 June 20/2 Gorst Creek Watershed Comprehensrve Plan � �� � • Draft documents will be provided m electron�c (pdfl format, Final CIP/CAP summary w�ll be provided m hardcopy (up to 8 copies) and electronic formats Deliverables The following deLverables will be submitted under th�s subtask • Draft and final CIP TASK 06 — OUTREACH AND INFORMATION TRANSFER The Outreach & Information Transfer Task addresses stakeholder outreach and communication, and informat�on transfer for the Gorst Watershed plann�ng process Each is discussed below While the mformat�on technology transfer task will take place near the end of the proJect, the stakeholder outreach and commun�cation tasks will take place from the very begmnmg and throughout the completion of the pro�ect Tasks m th�s section will support efforts m other pro�ect tasks Subtask 6.1 — Engage Stakeholders Objective Conduct effective public and stakeholder outreach and mvolvement through on�way and two-way communicat�on, ensure partic�pation of diverse and all mterested parties, support an open and transparent process, mvolve those most affected �n plan review and recommendat�ons, develop mater�als, processes and messages to promote awareness, understandmg and part�cipat�on mcludmg those who�om late m the process Activities The follow�ng act�v�t�es will be conducted as part of th�s subtask • Lead stakeholder advisory committee to engage mterested part�es, create open and transparent process, and support stakeholder rev�ew/consideration of plan elements • Take lead role m presentmg mformation to the Suquam�sh Tr�be and other stakeholders • Take lead role m coordmat�ng community workshop support for Crty-sponsored public and community workshops • Take lead role in preparmg media relat�ons mcludmg news releases, calendar announcements and newsletter art�cles � Develop stakeholder questionnatre mcludmg questtons related to stakeholder commun�cation practices, public and stakeholder understandmg, and concerns/challenges for th�s pro�ect � Develop advisory committee agendas • Attend and part�c�pate m advisory committee plannmg and debr�ef ineetmgs • Facilrtate five, two-hour advisory committee meet�ngs Ctry of Bremerton 233-1896-096 Scope of Work 23 June 2012 Gorst Creek Watershed Comprehensrve Plan � f� L • Provide community workshop support for C�ty-sponsored public and commun�ty workshops • Draft copy for med�a relations mcludmg news releases, calendar announcements and newsletter art�cles • Draft copy and review design for pro�ect postcards, fact sheets, and a generic pro�ect comment card • Pro�ect team meetmgs (�n person and by teleconference) � One (1) comment card Assumptions The task budget is based on the followmg assumpt�ons • Advisory meetmgs are expected to be 2 hours m durat�on • One round of ma�or revisions and one round of m�nor revisions for all pro�ect materials • C�ty will create and mamtam a pro�ect Web site with accurate and up-to-date pro�ect mformat�on, and un�que URL for convenient access • City will serve as pro�ect spokesperson for all media �nquir�es • City will provide one set of consolidated comments on communicatwn matenals • Consultant will addrt�onally provide up to 40 hours for communication matenals Additional communication matenals will be developed by the city Debverab/es The follow�ng deliverables will be submitted under this subtask • Facilrtation of five, two-hour adv�sory committee meetmgs • Schedule/scope for advisory committee meehngs • Three (3) news releases • Three (3) calendar announcements • Three (3) newsletter art�cles • Three (3) pro�ect postcards • Three (3) fact sheets • One (1) comment card Pro�ect team meetmgs (in person and by teleconference) Crty of Bremerton 233-1896-096 Scope of Work 24 June 2012 Gorst Creek Watershed Comprehenseve Plan . ,• , Task 6.2 TM Methodology Report Achvities AECOM will assume the lead role �n drafting the Technology Report sect�ons mclud�ng • Draft and final Technology Report includmg sect�ons for stormwater, LID, Planned Action EIS, and Habrtat Characterization by mcorporatmg ►nformat�on der�ved from pro�ect partners includmg WDFW and Ecology • Meet�ng attendance and coordmat�on Task 6.3 Technology Transfer AECOM will provide (CD Rom) cop�es electronic files to the City of all pro�ect documents and correspondence as an mdexed archive These files will be suitable for uploading onto the City's websrte, although uploaded content w�il be determmed by the C�ty Information will be generally similar to �nformation currently residing on the DCD port�on of the City's s�te All srte support and systems for thts reposrtory will be the City's respons�bil�ty Crty of Bremerton 233-1896-096 Scope of Work 25 June 2011 Gorst Creek Watershed Comprehensrve Plan EXHIBIT B Schedule See attached Crry ojBremerton 233-1896-096 Scope of Work 26 June 2012 Gorst Creek Watershed Comprehensrve Plan t •i• ♦ GORST CREEK WATERSHED COMPREHENSIVE PLAN PROJECT SCHEDULE ID I Task Name Duration Start Finish Predecessors 2011 2012 2 1 I N v Dec J n F M r A r I M J n Jul Au S t Nov Dec I Jan Feb Mar A r M I n J I Au Se O t N v Dec Jan Feb M r A r Ma Jun ul Au ct Nov D I J n 1 WATERSHED CHARACTERIZATION I 707 days' Mon 12M3/1 Tue 8/27/13 2 Inventory ExisUng Condd�ons � 72 days' Mon 12/13/10, Tue 3/22/11 i 3 Cahbrate HPSF Model � 60 days' Mon 11/26/12 Wed 6/26/13 10 � ���������������„ ������ 4 Sustain Model Basehne _� 44 days' Thu 6/27/13, Tue 8/27/13 3_ 5 Watershed A�al � 90 days' Mon 1/10/11' Fn 5/13/11; 6 Watershed Charactenzation Report � 236 days� Wed 7/27/1 P Wed 6/20/12 7 LAND USE PLAN � 380 days? Mon 7M6/12 Fri 1?J27/13 8 Develop Pro�ect Strategies i 35 days' Mon 7/16/12 Fn 8/31/12�6 9 Land Use Analysis 35 days' Mon 7/16/12, Fn 8/31/12�6 10 Land Use Concept and Regulat�ons 60 days� Mon 9/3/12; Fn 11 /23/12 8,9 11 C�ty Strategy 1 day�� Fn 8/17/12 Fn 8/17/12 � 12 Pro/ect Management Team Charette 6 days Tue 9/4/12 Tue 9/11/12 13 Outreach and Draft P/an Developmenf 100 days�; Wed 9/12/12� Tue t/29/13�,12 14 Preferred Alternatroe Plan � 45 da Wed 6/5/13 Tue 8/6/13',48 15 Adoption Process i 103 da Wed 8/7/13 Fn 12/27/13,14 16 ENVIRONMENTAL IMPACT STATEMENT (EIS) I 317 days? Mon 9/3/12 Tue 11/19/13 17 EIS Inrtiation I 6 days' Mon 9/3/12' Mon 9/10/12i9 18 EIS Scoping 28 days� Mon 10/15/12 Wed 11/21/1244 19 AHected Envuonment and No Achon 80 da ys�i Tue 9/11/12 Mon 12/31/12 20 AltemahvesAnalysis 90 days�l Tue 11/13/12 Mo�46 21 Prehminary Draft EIS I 14 days Tue 3/19/13 Fn 4/5/13�20 22 Dr aft EIS � 21 da ys� Mon 4/8/13', Mon 5/6/13�21 23 Pub6c Comment Penod - 45 calendar da (min 30 I 30 days' Tue 5/7/13' Mon 6/17/13 22 24 Final EIS 75 days' Wed 8/7/13, Tue 11/19/1314 25 Planned Action Ordinance 0 days Tue 8/27/13 Tue 8/27/13 14,4 g�27 26 STORMWATER PLAN 290 days� Wed 8/8/12 Tue 9/17/13 27 Existmg Conditions Tech Memo 65 days' Wed 8/8/12� Tue 11/6/12 28 Pro Alternatrves Tech Memo 60 da Wed 11/7/12 Tue 1/29/13�27 6 29 Stormwater Plan � 30 days Wed 8!7/13; Tue 9/17/13,28,14 30 CAPITAL IMPROVEMENTS PLAN & CORRECTIVE ACTION PLAN � 225 days' Wed 11/7/12 Tue 9/17/13 31 Stormwater Correctroe Action Tech Memo � 45 da Wed 11/7/12 Tue 1/8/13 27 32 Gorst UGA Land Use CIP � 30 da Wed 8/7/13 Tue 9/17/1331,14 33 Landtdl CAP � 74 days' Tue 5/7/13 Fn 8/16/13,22,31 34 Fish Passa Barner En Report � 30 da Wed 8/7 Tue 9/17/13 31 14 35 Summary CIP I 30 da Wed 8/7/13� Tue 9/17/13'14 31,28 36 OUTREACH & INFORMATION TRANSFER � 733 days; Tue 3/1/11 Thu 12/19M3� 37 CommunicaUon Strategy Work Plan I 33 days Tue 3/1/11, Thu 4/14/11' ____ � I 38 En Stakeholders � 365 da ys� Wed 8/8/12 Tue 12/31/13 37 39 Methodolo Report I 45 days� Wed 8/28/13 Tue 10/29/1325 40 Technolo Transter 45 days� Wed 10/30/13 Tue 12/31/13,39 41 Kickoff Meetin 1 da y�� Wed 3/16/1 U Wed 3/16/i i, ( 42 Advisory Commrttee Meetin #1 Pro�ect Strate � 1 da Tue 6/26/12 Tue 6/26/12 � 43 Elected and A Oificials Bnefin I 365 da ys' Wed 8/8/12 Tue 12/31/13'37 44 Joint Meeting with tribe � 23 days Wed 9/12/12� Fri 10/12/12�12 45 Pubhc MeeUng #1 Visionmg Workshop/Pubhc Kickoff/Scopmg ', 7 days Mon 10/15/12� Tue 10/23/1244 46 Adviso Committee Meetin #2 - EIS Scoping � 14 da Wed 10/24/12� Mon i t/12/1245 47 Pub6c Meetin #2 Draft Land Use Plan � 50 days' Tue 11/13/12 Mon 1/21/13�46 48 Adviso Commdtee Meeting #3 - Draft EIS/Preferred Alternative j 21 days' Tue 5/7/13 Tue 6/4/13 22 49 Pub6c Meeting #3 Draft EIS/Preferred AltemaUve ' 14 da Wed 6/5/13 Mon 6/24/13 48 50 Adwsory Committee Meeting #4 - Planned Action Ord/Final Land Use i� 14 days� Tue 6/25/13 Fri 7/12/13 Plan 51 Joint Legislative Meeting #1 - Planned Action Ordinance/Final Land Use 28 days Wed S/7/13 Fn 9/13/13 Plan 52 Plannin Commission Meetin i 28 da ys' Mon 9/16/13� Wed 10/23/13 51 53 City Councd Meehn � 40 days Thu 10/24/13i Wed 12/18/13 52 54 BOCC Meetings I 40 days Thu 10/24/13' Wed 12/18/13 52 � I I Task Pro�ect Summary inactive Task Duration-only -- -- ."— Finish only 7 ,I Pro�ect Gorst Schedule LG 4 no strik Split � ���„�,,,„� ��„� � �, � Extemal Tasks Inactive Milestone <� Manuai Summary Rollup Progress � Date Fn 8/10/12 Milestone ♦ Extemal Milestone e Inactive Summary Manual Summary Deadline b � Summary InacUve Task � Manual Task �'°`°"°` Start only C � Page 1 � . .. . EXHIBIT C �udget The professional serv�ces described m the Scope of Work (Exhibrt A) w�ll be performed on a cost plus mult�plier bas�s The mutt�plier used to determme billmg rates with AECOM is 2 90 wrth an added 6% for all AECOM d�rect labor to cover other d�rect costs (computer, telephone, copies, etc ,) and 5% for all work completed by subcontractors All dollar figures presented wrthm this agreement mclude any appl�cable taxes Bud et TASK AECOM 6% LABOR SUBS 5% SUBS TOTAL O1-Watershed Character�zation $24,380 $1,463 0 0 $25,843 02-Land Use Plan and Development $52,360 $3,142 $38,240 $1,912 $95,654 Re ulations 03-Planned Act�on EIS $87,120 $5,227 $109,090 $5,455 $206,892 04-Stormwater Plan $67,100 $4,026 0 0 $71,126 OS-Caprtal Improvement and $98,940 $5,936 $2,930 $146 $107,952 Corrective Act�on Plan 06-Outreach and Information Transfer $48,710 $2,923 $1,500 $75 $53,208 TOTAL BiJDGET $378,610 $22,717 $151,760 $7,588 560 675 A$20,000 mrtial letter contract was executed on August 8, 2012 to meet grant schedule requ�rements That $20,000 authorization is mcluded m the $560,675 total budget author►zation under this contract Ctry of Bremerton 233-l896-096 Scope oJ Work 27 June 2012 Gorst Creek Watershed Comprehensrve Plan . .• . EXHIBIT C Task est�mated rote at 2 9 multiplier 1 1 SUSTAIN and HSPF Model Support 2 Land Use Plan 2 1 Develop Pro�ect Outiine 2 2 Land Use Enwronmental and Infrastructure Analysis 2 3 Land Use Concepts and Regulations 2 4 Preferred Alternative/Proposed Plan 2 5 Adoption Process 3 PAEIS 3 1 EIS Initiation 3 2 Plan Alternatwes and EIS Scoping 3 3 Preliminary Drak Ptanned Action/Progremmatic EIS 3 4 Dreft Planned Action/Progrommatic EIS 3 5 Final EIS 3 6 Planned Action Ordmance 4 Stormwater Plan 4 1 Existing Conditions and Deficiencies Technicai Memorandum 4 2 Programmatic Stormwater Management Alternatives Techmcal Memorandum 4 3 Dreft and Final Stormwater Plan 5 CIP 5 1 Stormwater Corrective Actions Technical Memorandum 5 2 Land Use Plan CIP 5 3 Landflll Corrective Action Plan 5 4 Fish Passage Barner Preliminary Engineering 5 5 Summary CIP 6 Public Coordination 6 1 Engage Stakeholders 6 2 TM Methodology Report 63 TechnologyTrensfer Totals AECOM LaborTotal 7 Lump Sum Expenses at 6Y of direct labor Total Budget PM (HRS) Sr Eng (HRS) Sr PIan�HRS� Jr Eng (HRS) Jr Plan (NRS) Modeler(HRS) Admm (HRS) Su6contractor markup �5% GIS Graphics/CA00 165 150 140 100 100 125 70 100 100 s 5i szo 00 o So 00 o So 00 o So 00 o So 0o ioo Slz,soa oo s Sseo 00 50 00 $a oa ioo $io 000 00 0 $o 00 12 $1 980 00 0 $0 00 4 $560 00 0 $0 00 0 $0 00 0 $0 00 0 $0 00 $4 040 00 $202 00 0 $0 00 8 $800 00 24 $3 960 00 12 $1 800 00 24 $3 360 00 24 $2 400 00 16 $1,600 00 0 $0 00 8 $560 00 $7 500 00 $375 00 24 $2 400 00 8 $800 00 az Ss zso 0o a Sl,zoo 0o sz Sa,aso 0o s Ssoo 0o za $z aoo 00 0 50 0o s Sseo 0o Sia aoo 00 $�zo 00 o So 00 o So o0 24 $3 960 00 8 $1 200 00 24 $3 360 00 8 $800 00 0 $0 00 0 $0 00 S $560 00 $10 200 00 $510 00 0 $0 00 24 $0 00 za Ss 96o ao o So 0o ie 52 Zao 00 o So 0o So 00 o so ao i Slaa o0 52 ioo 00 9ios o0 o So 0o iz Si zoo 00 $0 00 $0 00 ie 5z sao 00 0 $o 0o i6 Sz zao 00 o So 0o s Ssoo 00 o So 0o a 5seo 00 $a eso 0o Szaa o0 o So 00 0 50 00 24 $3 960 00 4 $600 00 24 $3 360 00 0 $0 00 20 $2 000 00 0 $0 00 8 $560 00 $13 500 00 $675 00 0 $0 00 24 $2,400 00 24 $3 960 00 40 $6 000 00 48 $6,720 00 32 $3 200 00 40 $4 000 00 0 $0 00 40 $2 800 00 $54 630 00 $2 731 50 24 $2 400 00 48 $4 800 00 16 $2,640 00 8 $1 200 00 24 $3 360 00 16 $1 600 00 32 $3 200 00 0 $0 00 24 $1 680 00 $17 460 00 $873 00 24 $2 400 00 24 $2 400 00 12 $1 980 00 4 $600 00 12 $1 680 00 8 $800 00 8 $800 00 0 $0 00 24 $1 680 00 $9 620 00 $48100 12 $1 200 00 12 $1 200 00 ie Sz eao 0o z 53ao 0o iz 51 eso 00 o So 00 o So oa o 50 0o a Szso 00 $e o00 00 $aso 00 o So 0o a 5aoo 00 $0 00 12 $1980 00 24 $3 600 00 8 $1 120 00 32 $3 200 00 8 $800 00 0 $0 00 8 $560 00 $0 00 $0 00 0 $0 00 24 $2 400 00 16 $2 640 00 40 $6 000 00 16 $2 240 00 40 $4 000 00 12 $1 200 00 0 $0 00 16 $1 120 00 $0 00 $0 00 24 $2 400 00 32 $3 200 00 32 $5 280 00 56 $S 400 00 12 $1 680 00 64 $6 400 00 8 $800 00 0 $0 00 24 $1 680 00 $0 00 $0 00 32 $3 200 00 32 $3 200 00 iz Sl,eso 0o s Si zoo 0o a Si i2o 0o za Sz aoo 0o s $soo 0o a 50 0o ie S112o 00 50 oa 50 0o ao Sa o00 0o ie Si eoo 00 40 $6 600 00 24 $3 600 00 24 $3 360 00 16 $1 600 00 16 $1 600 00 0 $0 00 16 $1 120 00 $2,930 00 $146 50 40 $4 000 00 24 $2 400 00 as 5� 9zo 00 0 50 00 o So 00 0 $o 0o a So 00 0 50 0o s Sseo 00 $o 00 50 00 o So 0o is Si eoo 00 24 $3 960 00 16 $2 400 00 8 $1 120 00 40 $4 000 00 16 $1 600 00 0 $0 00 16 $1 120 00 $0 00 $0 00 0 $0 00 32 $3 200 00 32 $5 280 00 80 $12 000 00 4 $560 00 96 $9,600 00 8 $800 00 0 $0 00 16 $1,120 00 $0 00 $0 00 12 $1 200 00 24 $2 400 00 144 $23 760 00 0 $0 00 16 $2 240 00 0 $0 00 0 $0 00 0 $0 00 24 $1 680 00 $0 00 $0 00 32 $3 200 00 64 $6 400 00 iz Sl,9so 0o ie Sz aoo 0o iz Si 6so 00 o So 00 o So 0o a So 0o i6 5i iio 00 $i soo 0o S�s oo s Ssoa oo iz $i zoo 00 z Sssa o0 0 $o 00 0 5a o0 o So 00 o So 00 o So oa i6 Si iio 00 50 0o So 0o a 5aoo 0o a 5aoo 00 771 $99 990 00 500 $52 500 00 484 $48 160 00 508 $40 800 00 324 $22 400 00 225 $12 500 00 388 $22 260 00 $151 760 00 $7 588 00 476 $37 600 00 548 $42 400 00 � Total Hours ToWI Cost Budget Per Task 216 $24 3S0 00 $24,380 00 $92,512 00 24 $7 582 00 140 $24 755 00 112 $29 840 00 96 $20 590 00 54 $9 745 00 $201,664 50 48 $il 364 00 104 $27 O55 00 296 $9124150 168 $36 813 00 92 520,04100 42 $15150 00 $67,100 00 116 $13 660 00 196 $22 800 00 260 $30 640 00 $102,016 50 132 $14 220 00 200 $27 356 50 72 $10 080 00 152 517 400 00 272 $32 960 00 $50,285 00 2S0 $37 280 00 76 $10 755 00 26 $2 250 00 3174 $537 958 00 $537,958 00 CHECK CELL $378 610 00 $22 716 60 $22,716 60 $560 674 60 $560,674 60 CONTRACT EXPIRED 7/31/14