5164
PUGET SOUND ENERGY, INC.
Extend Secondary Main PSE #101077532
Econ Devel
LEG 12-1
5/3/2012
8/1/2012
2014
�
PUGFT SOUND FIVERGY
May 3, 2012
City of Bremerton
345 6`" St , Suite #600
Bremerton, WA 98337
Re Customer Agreement to Extend Secondary Main_
PSE order Na 101077532
Dear Gary Sexton,
`� POTELC4IHC
�
A �uente Sarvtces Company
In accordance w�th Puget Sound Energy's (PSE) Tariff G, Rate Schedule 85 "Lme Extensions", on file with the
Washington Ut�l�ttes & Transportation Commission, th�s agreement confirms our intention to provide electncal senr�ce ta
your pro�ect at 613 4� St , Bremerton, WA per the attached PSE design drawing The delrvery voltage of this electr�cal
service is 120/240 volts, 1-Phs �
This cast information is valtd for 90 days frvm the date of lhis letter, and �s subject to being updated after that time The
payment of the total amount due and the return of signed documents as noted elsewhere in this letter is required prior to
commencmg our work
Please make checks payable to Puget Sound Energy and return to address Ilsted below
22884 Ryen Dr NW
Address
Poulsbo 9837Q
City Zip Code
The cost for this work is determined as foliows
Estimated Normal Construction Cost mcluding transformatron
Less Appl�cable Margm Allowance
Totai ime extension charge
Other charges- Larger Transformer
Dedicated Facdity
Relocalion of Existing PSE Facdities
Total Other charges
Total amount due under this lefter
$000
- 0 00
_ $000
$Q00
$ 987 40
+ 0 00
_ $ 987 40
$ 987.40
Charges for temporary and permanent electric servfce lines for your proJect are not included ln the above
charges. To order these services and obtain costs, please contact PSE at 888-321-7779 after electrical
inspections have been approved. These additional charges wlll be billed after instailation in accordance with
Rate Schedule 85. These charges also do not include permitting fees or trenching and other excavation related ,
work that fs your responsibility. I
Charges relat�ng to your PSE-provided street lightmg system in this pro�ect are not included in the abave pnces, and wdi
come to you from PSE's IntoLight deparfinent under separate letter Charges relating to Rate Schedule 73 "Conversion to
tlnderground Service for Customers other than Government Entities" wdl be addressed under separate letter
3538 9108
This cost information refiects the work being performed dunng normal working hours These charges do not mclude
permittmg fees or trenching and other excavation-related work that is your responsibility to provide
Please review the attachments provided The Excavation Requirements & Final Grade Certification must be signed by
the pro�ect owner or designee, and returned to me along with a signed copy of this letter prior to the start of construction
The work sketch document shows the proposed design, mcludmg the location of permanent, aboveground electrical
facilities required to provide electrical service to your pro�ect Fault current mformation for transformers associated with
your pro�ect are noted on the work sketch drawmg Please notify me immed�ately if you believe there are conflicts
between PSE's design and your pro�ect Additional construction-related mformation and information on metermg and
service entrance requirements is provided m PSE's Electric Service Handbook for commercial proJects If you do not
have one of these handbooks, and would like one, please contact me It is your responsibdity to provide your pro�ect
manager, site superintendent, and subcontractors with any relevant informatton from this correspondence, it's
attachments, and PSE's Handbook that applies to their work
Refunds associated with the line extension charge may be available for additional permanent serwce hook-ups not mitially
considered that are made within five (5) years of the date on which the electric distnbution facilities installed for this
pro�ect are initially energized if no Margm Allowance has irntially been provided, or if your Margm Allowance exceeds
$75,000, PSE agrees to calculate and refund the Margin Allowance, sub�ect to Schedule 85, two (2) years after the line
extension is energized Customers are responsible for making all refund requests A refund may be requested one (1)
time within six (6) years of the date on which the distribution facdities are irntially energized Your refund request should be
directed to PSE's Customer Accounting Coordinators at 253-476-6335 or 253-476-6440 You will find it useful to retain
this letter to use as a reference when making your refund request
All costs and refunds are in accordance with PSE's Rate Schedule 85, and any discrepancies between this letter and the
Rate Schedule wdl be resolved in favor of the Rate Schedule Rate Schedule 85 contains more detailed information
covermg costs, refunds, r�ghts, and obligations than is reflected in this letter The entirety of Rate Schedule 85 may be
viewed at PSE's website www pse com under the "Inside PSE" heading
Pro�ects developed by l.imited-Liabdity Comparnes (LLC's) are required to provide contact information for all managing
members in addition to a copy of your Master Busmess Application This information too, must be provided prior to
commencmg const�uction on your pro�ect
Thank you for the opporturnty to provide electncal service to your pro�ect PSE will use reasonable diligence m
commencing this work, but we wdl not be liable for any detays resulting from circumstances beyond our control, mcluding
but not limited to fadure to receive necessary Operatmg Rights If you have any questions, please call me
at 253-606-6089
Smcerely,
( _w��"(il— �' 4--�-__"""
Mike Klapperich
Pro�ect Manager
Potelco, Inc
I have read and agree to the terms and conditions outlined in this agreement and it's attachments
� Cl..
OWNER OR OWN R DESIGNEE'S SIGNATURE
G �-� c� � �r�YYle.r� e�
�O�' �/ !'� � �� Y1 �Ol�/ 3, �! 2
PRINT NAME DATE
3538 9I1�