Loading...
HomeMy WebLinkAbout5164Contract Number Vendor• Sub�ect: Department: File Class• Begin Date: End Date. Review Date: Vault Date: Comments: 5164 PUGET SOUND ENERGY, INC. Extend Secondary Main PSE #101077532 Econ Devel LEG 12-1 5/3/2012 8/1/2012 2014 � PUGFT SOUND FIVERGY May 3, 2012 City of Bremerton 345 6`" St , Suite #600 Bremerton, WA 98337 Re Customer Agreement to Extend Secondary Main_ PSE order Na 101077532 Dear Gary Sexton, `� POTELC4IHC � A �uente Sarvtces Company In accordance w�th Puget Sound Energy's (PSE) Tariff G, Rate Schedule 85 "Lme Extensions", on file with the Washington Ut�l�ttes & Transportation Commission, th�s agreement confirms our intention to provide electncal senr�ce ta your pro�ect at 613 4� St , Bremerton, WA per the attached PSE design drawing The delrvery voltage of this electr�cal service is 120/240 volts, 1-Phs � This cast information is valtd for 90 days frvm the date of lhis letter, and �s subject to being updated after that time The payment of the total amount due and the return of signed documents as noted elsewhere in this letter is required prior to commencmg our work Please make checks payable to Puget Sound Energy and return to address Ilsted below 22884 Ryen Dr NW Address Poulsbo 9837Q City Zip Code The cost for this work is determined as foliows Estimated Normal Construction Cost mcluding transformatron Less Appl�cable Margm Allowance Totai ime extension charge Other charges- Larger Transformer Dedicated Facdity Relocalion of Existing PSE Facdities Total Other charges Total amount due under this lefter $000 - 0 00 _ $000 $Q00 $ 987 40 + 0 00 _ $ 987 40 $ 987.40 Charges for temporary and permanent electric servfce lines for your proJect are not included ln the above charges. To order these services and obtain costs, please contact PSE at 888-321-7779 after electrical inspections have been approved. These additional charges wlll be billed after instailation in accordance with Rate Schedule 85. These charges also do not include permitting fees or trenching and other excavation related , work that fs your responsibility. I Charges relat�ng to your PSE-provided street lightmg system in this pro�ect are not included in the abave pnces, and wdi come to you from PSE's IntoLight deparfinent under separate letter Charges relating to Rate Schedule 73 "Conversion to tlnderground Service for Customers other than Government Entities" wdl be addressed under separate letter 3538 9108 This cost information refiects the work being performed dunng normal working hours These charges do not mclude permittmg fees or trenching and other excavation-related work that is your responsibility to provide Please review the attachments provided The Excavation Requirements & Final Grade Certification must be signed by the pro�ect owner or designee, and returned to me along with a signed copy of this letter prior to the start of construction The work sketch document shows the proposed design, mcludmg the location of permanent, aboveground electrical facilities required to provide electrical service to your pro�ect Fault current mformation for transformers associated with your pro�ect are noted on the work sketch drawmg Please notify me immed�ately if you believe there are conflicts between PSE's design and your pro�ect Additional construction-related mformation and information on metermg and service entrance requirements is provided m PSE's Electric Service Handbook for commercial proJects If you do not have one of these handbooks, and would like one, please contact me It is your responsibdity to provide your pro�ect manager, site superintendent, and subcontractors with any relevant informatton from this correspondence, it's attachments, and PSE's Handbook that applies to their work Refunds associated with the line extension charge may be available for additional permanent serwce hook-ups not mitially considered that are made within five (5) years of the date on which the electric distnbution facilities installed for this pro�ect are initially energized if no Margm Allowance has irntially been provided, or if your Margm Allowance exceeds $75,000, PSE agrees to calculate and refund the Margin Allowance, sub�ect to Schedule 85, two (2) years after the line extension is energized Customers are responsible for making all refund requests A refund may be requested one (1) time within six (6) years of the date on which the distribution facdities are irntially energized Your refund request should be directed to PSE's Customer Accounting Coordinators at 253-476-6335 or 253-476-6440 You will find it useful to retain this letter to use as a reference when making your refund request All costs and refunds are in accordance with PSE's Rate Schedule 85, and any discrepancies between this letter and the Rate Schedule wdl be resolved in favor of the Rate Schedule Rate Schedule 85 contains more detailed information covermg costs, refunds, r�ghts, and obligations than is reflected in this letter The entirety of Rate Schedule 85 may be viewed at PSE's website www pse com under the "Inside PSE" heading Pro�ects developed by l.imited-Liabdity Comparnes (LLC's) are required to provide contact information for all managing members in addition to a copy of your Master Busmess Application This information too, must be provided prior to commencmg const�uction on your pro�ect Thank you for the opporturnty to provide electncal service to your pro�ect PSE will use reasonable diligence m commencing this work, but we wdl not be liable for any detays resulting from circumstances beyond our control, mcluding but not limited to fadure to receive necessary Operatmg Rights If you have any questions, please call me at 253-606-6089 Smcerely, ( _w��"(il— �' 4--�-__""" Mike Klapperich Pro�ect Manager Potelco, Inc I have read and agree to the terms and conditions outlined in this agreement and it's attachments � Cl.. OWNER OR OWN R DESIGNEE'S SIGNATURE G �-� c� � �r�YYle.r� e� �O�' �/ !'� � �� Y1 �Ol�/ 3, �! 2 PRINT NAME DATE 3538 9I1�