Loading...
HomeMy WebLinkAbout08/15/2012 6D AGENDA BILL CITY OF BREMERTON CITY COUNCIL (o D ■■ eeeeeeeeeeeeeeeeeeeeeeeeeseeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeseeeeeeeeeeeeeeeeee SUBJECT: Professional Services Study Session Date 8/8/2012 Agreement with MWH Americas Inc for COUNCIL MEETING Date 8/15/2012 design of the Warren Avenue Bridge Water Department PW &U Engineering Main Replacement and Flow Control Project Presenter Ned Lever Phone (360) 473 -2398 SUMMARY: A water system earthquake vulnerability assessment, completed in 1997, identified the bridge water main crossings as highly probable points of failure in the City's water system during a large seismic event Corrections recommended include structural upgrades as well as seismic valves at the crossing points The Warren Avenue bridge water main (identified as a moderate -high nsk in the assessment) is in poor condition with missing structural connections and continuously leaking joints Concerns regarding failure of the main with potential damage to the Warren Avenue Bridge make this project a priority Five consultants were solicited to submit proposals to update the Plan Three proposals were received for evaluation MWH Americas, Inc was selected and a professional services agreement was negotiated for 292,908 with 92.992 to be held by the City pending budget approval for construction in 2013 . ATTACHMENTS: 1) Council Summary, 2) Agreement FISCAL IMPACTS (Include Budgeted Amount) This contract is fully funded $220,000 has been included in the 2012 Budget for this project Estimated cost for construction is estimated to be $1,700,000 and is anticipated for budget approval in 2013 APPROVALS: DEPARTMENT DIRECTOR CITY ATTORNEY FINANCE DIRECTOR MAYOR RECOMMENDED MOTION: Move to approve the professional services agreement for the project Warren Avenue Bridge Water Main Replacement and Flow Control project and authorize the Mayor to finalize and execute the agreement with MWH Americas, Inc in the amount of $ 292,908 with substantially the same terms and conditions as presented STUDY SESSION ACTION: Consent Agenda ❑ General Business ❑ Public Hearing COUNCIL PRESIDENT COUNCIL ACTION: Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action Form Updated 11/02/2011