BREMERTON TBD BOARD 345 6 Street, Suite 600, Bremerton, WA 98337 (360) 473 -5280
JULY 25, 2012
SPECIAL MEETING FOR A WORK SESSION OF THE
BREMERTON TRANSPORTATION BENEFIT (TBD) DISTRICT BOARD
TO BEGIN IMMEDIATELY FOLLOWING THE CITY COUNCIL STUDY SESSION &
EXEMPT CLOSED SESSION — IN COUNCIL CONFERENCE ROOM 603
The TBD Work Session is open to the public but there will be no opportunities for input or
participation, no action will be taken, and the content of these items is subject to change
The next regular Meeting of the Bremerton TBD Board is scheduled August 7, 2012
A Presentation on the Status of the Bremerton TBD Work Plan — Thomas Knuckey, City Engineer
B Proposed meeting schedule of the Bremerton TBD Board — Adam Brockus, Chair
C Other General Business of the Bremerton TBD Board (As necessary )
® Amencans with Disabilities Act (ADA) accommodations provided upon request Those requmng special accommodations
should contact the City Clerk's Office at (360) 473 -5323 by noon on Monday preceding the TBD meeting
BREMERTON TRANSPORTATION
BENEFIT, DISTRICT
i
r
Special Work Session
July 25, 2012 j
Goals of this Presentation
• Review Expenditure Alternatives & Evaluation
Criteria identified by the Board at the April 11,
2012 meeting
• Review analysis of road segments completed by
staff
• • Review work selection alternatives identified:by
staff
I
April 11 TBD Meeting Direction
Make strategic investments to minimize streets
moving to "Failed" condition.
Direct" most funding, to maintenance
• Look'for ,opportunities to leverage construction.
(match grants)
• Use pavement management index.'as primary
selection criteria; threshold at Tair ".'(PMI above~
55).-
• Develop a point system to assist in selecting
projects
Available Funding and Need
2010 Consultant report recommends $19M in annual - preservation and
maintenance expenditure (elevates PMI' rating to 60.over 10- years)
Assumption is $300,000 expended on maintenance, with any remaining
funds directed to matching grants
Total Preservation Need by Rating::
r
• Excellent roads - no preservation required
Good roads - $300,000 annual expense /lane mile)
• Fair roads - $2.21VI ' initial expense to move.to "Good" ($32,500/LM)
• Poor roads ' $13M initial expense to move to "Excellent"
($100,000 /LM)
• Failed roads - $52M expense to move to "Excellent" ($500,000 /LM)
2010 Pave Mgt Study An a lysi s
o
1 g
. GOOD
■ P
Poor, Fair ci FAILED
13 I, • •'
Lane Miles (LM) Calculated
j
I
Usin Data from 2010 MRC
- •• includes Shoulde
Expenditure Alternatives
1. Direct'all funding to preserve all "Good" Roads (crack,sealing,) I
annual expenditure of $300K + / -, increasing over time..
Z.' Preserve all "Good" roads except Residential, expend. $150K +j- on
worst Fair Roads (grind &patch,) 2013 work includes: •.
"• Sheridan Rd; Schley to.Callahan - $15,500
• 6th St; High to Veneta - $17,500
• E 11thSt; Perry to Hayward - $5,500 -
• Austin Dr; Kitsap Way to Ramp So. of 3 - $16,500 j
' 1st St; Wilkes to Auto Center Way - $5,000 I
• Wheaton Way; Campbell to Lebo - 57,500
•Naval Ave; 4th to 5th - $3,500
Marine. Dr; Kitsap to Bertha - 59,000
• 15th St; Arvon to Naval - $7,500 .
• Sheridan; Callahan -to Bullard - $5;000
• Riddell; County Line to Wheaton - 524,500 i
• Naval; 11th to 12th - $6,500 �
• Halverson; 30th to 31st - $13,000
• Auto Center Way; Burwell to 5th - 513,000
� ° Q UI��J ! ° ° CJI�IJ� ° LL-�U UISo
,� 0 a[�`�- a- --� o a e
Ij
4
BREMERTON TRANSPORTATION
BENEFIT DISTRICT
SPECIAL WORK SESSION
JULY 25, 2012
"FAIR" roads proposed for grind and patch in 2013 include the following:
• Sheridan Rd; Schley to Callahan - $15,500
• 6th St, High to Veneta - $17,500
• E 11 th St; Perry to Hayward - $5,500
• Austin Dr, Kitsap Way to Ramp So. of 3 - $16,500
• 1 st St; Wilkes to Auto Center Way - $5,000
• Wheaton Way; Campbell to Lebo - $7,500
• Naval Ave; 4th to 5th - $3,500
• Marine Dr, Kitsap to Bertha - $9,000
• 15th St; Arvon to Naval - $7,500
• Sheridan; Callahan to Bullard - $5,000
• Riddell; County Line to Wheaton - $24,500
• Naval; 11 th to 12th - $6,500
• Halverson; 30th to 31 st - $13,000
• Auto Center Way; Burwell to 5th - $13,000
�
Page 1 of 1 711912012
MEMORANDUM
TO: Transportation Benefit District
FROM: Tom Knuckey
DATE: April 16, 2012
SUBJECT: Notes from April 11, 2012 Meeting
There was significant discussion on pavement maintenance, need and priontization at the
April 11 th TBD meeting Below are listed the results of the votes cast to help identify the
Districts priorities in identifying projects for construction Staff will take this information and
develop criteria and a project list in the coming months for implementation in 2013
EXPENDITURE ALTERNATIVES:
The following recommendations were recorded
District Maintenance Capital Other
Representative Leverage
A Brockus 60% 30% 10%
R Runyon 80% 20%
E Younger 0-100% 0 —100%
N Wofford 0-100% 0 - 100%
F Flemister 60% 30% 10%
C Arends 70% 20% 10%
L Dau s 85% 15%
J McDonald 0-100% 0 - 100%
G Wheeler 0-100% 0 - 100%
Conclusions
• Most funding should be expended on maintenance
• Staff should look for opportunities to use TBD funds to leverage construction (either
maintenance or capital.) Leverage should only use a large portion of available funding
if the opportunity is particularly compelling
Page 1 of 2 711912012
EVALUATION CRITERIA:
Evaluation criteria identified as highest priority for project selection
Votes
Criteria Cast
PMI Index rating — fair or better (PMl above 55 5
PMI Index rating — good or better (PMl above 70 3
Traffic Volumes measured or estimated 1
Street classification — residential 1
Street classification — arterial or collector 1
Proximity to schools 1
Establish a point system for project selection 2
Update outdated traffic signals 1
Conclusions
• Pavement management index should be primary selection criteria, with threshold at
"fair" (PMI above 55 )
• A point system should be developed to assist with project selection
i
i
i
Page 2 of 2 711912012
it
c i" I c 0 SA
INLE T
0, hT i
"Wom 1
j
Z
If
L
1J,
I J1
7
WT
A
N
4. 1
p '. I I
4 0 it i I - Fit
_4
U. S. NAVY
t JACKSON PARK
HOUSING UREA W .
� - 1 I _ .a > - � I :.� � , ,�•, � � �:. I � I�a lid _� - . !IJ �.le � E a t lI ,�� * �. - i i ' ,
X .-
I L
IL
I t
JI
J
ry
p k7
q
'4
l q�
1, lj
Al 0
,' �_ ,
t
4i
-
f 7-1
_3 N b 1 ' j ,
IL_
__ i
__T
T fi ------
ti
X
pli
7 !11
s °� �, � ' ! � I I � I�� l � I } - 4 sl:• Ik I � .f \ � I " his Ir I � I I I i I � ,�.
" % u
q F
Al %
Ip
- �� -- r I _ : �i 4 ...�L IL i e n cnMr I ��` �� - I� � � — i �.: -. °ii" � ' _.LI :.
w.
n
i z
U. S. NAVY
PUGET 30OND NAVAL SHIPYARD
II
CITY OF BREMERTON
STREET IMPROVEMENTS
11 1
ALTERNATIVE 1
f All Good Roads
"GOOD" ROADS
ARTERIAU COLLECTORS
;A
Li
ALL RESIDENTIAL
-
lit
INLET
it J
Al
J it
if
It
ji
It
NN
iff
if 1
i! PUGET SOUND NAVAL SHIPYARD
CITY OF BREMERTON
7 if
STREET IMPROVEMENTS
I N Ar
ALTERNATIVE 2
All Non-residential Good Roads
1 , and Select Fair Roads
ARTERIAL] COLLECTORS
I "FAIR" ROADS
2013 CONST.: ARTERIAL/COLLECTOR