HomeMy WebLinkAbout05/29/2012 PACKET(DRAFT) AGENDA
Special Meeting - Bremerton Planning Commission
(Subject to PC approval)
May 29, 2012
5:30 P.M.
th
345 – 6Street
Meeting Chamber – First Floor
I. CALL TO ORDER
II. ROLL CALL (quorum present)
III. APPROVAL OF THE AGENDA
IVAPPROVAL OF MINUTES:
April 17, 2012Regular meeting.
o
V. PUBLIC MEETING
A. Call to the Public:
Public comments on any item not on tonight’s agenda
B. Public Hearing
1.
Shoreline Master Program
VI. BUSINESS MEETING
A. Chair Report:
Chairman Jose
B. Director Report:
Andrea Spencer
thth
SKIA Sub-Area Plan – Public Hearing Date: June 19 or 26?
C.Old Business:
D.New Business
VII. ADJOURNMENT: The next regular meeting of the Planning Commission is
tentatively scheduled for:
June 19, 2012
Planning Commission meeting packets are available on-line at
www.ci.bremerton.wa.us
DRAFT
Subject to May 29, 2012 Approval
CITY OF BREMERTON
PLANNING COMMISSION
MINUTES OF REGULAR MEETING
April 17, 2012
CALL TO ORDER:
Chair Jose called the regular meeting of the Bremerton Planning Commission to order at 5:30 p.m.
ROLL CALL
Commissioners PresentStaff Present
Chair Jose Andrea Spencer, Director, Department of Community Development
Vice Chair Cockburn Doug McIntyre, Long Range Planner, Department of Community Development
Commissioner Albright
Commissioner Lambert Others Present
Commissioner Mosiman Deborah Munkberg, Consultant, Blumen Consulting Group
Commissioner Tift
Commissioners Absent
Commissioner Hoell (excused)
Quorum Certified
APPROVAL OF AGENDA
COMMISSIONER ALBRIGHT MOVED TO APPROVE THE AGENDA AS PRESENTED. COMMISSIONER
MOSIMAN SECONDED THE MOTION. THE MOTION CARRIED UNANIMOUSLY.
APPROVAL OF MINUTES
COMMISSIONER LAMBERT MOVED TO APPROVE THE MINUTES OF MARCH 20, 2012 AS AMENDED.
COMMISSIONER TIFT SECONDED THE MOTION. THE MOTION CARRIED UNANIMOUSLY, WITH
CHAIR JOSE ABSTAINING.
PUBLIC MEETING
Call to the Public
(public comments on any item not on the agenda)
Chair Jose
asked if there were any comments from citizens. Seeing none, he closed the public portion of the meeting.
Workshop: South Kitsap Industrial Area (SKIA) Subarea Plan Overview
Mr. McIntyre
provided a brief update of the SKIA Subarea Plan since the Commission last reviewed it on August 17, 2010.
He reminded the Commission that the subarea plan is funded by an Environmental Protection Act (EPA) Climate Showcase
Communities Grant that was awarded in 2010. Throughout the planning process, guidance was provided by the Technical
Working Group (TWG), which is made up of stakeholders, property owners, and various members of city staff, and the
Executive Committee (EC), which is made of up Kitsap’s elected officials, and policy leaders, including Chair Jose. Two
public open houses have also been held. He briefly reviewed the meetings and events that have occurred to date and
th
announced that the Commissioners are encouraged to attend the next public open house on May 7.
Mr. McIntyre
reviewed that a draft subarea plan and draft Environmental Impact Statement (EIS) was issued on June 9,
2011, and the comment period ended on July 21, 2011. A final EIS and new draft subarea plan was issued on March 29,
2012. The design team is working with TWG and the EC to address comments and suggestions, and the draft plan will likely
change before it is presented to the Commission for a formal public hearing in June. A public hearing and final adoption by
the City Council is tentatively scheduled for August 1, 2012
Deborah Munkberg, Consultant, Inova PCD LLC & Blumen Consulting Group,
said the draft EIS looked at the
following alternatives:
Alternative 1
would require no action. It is a baseline that is required by State Law. Based on existing growth
trends over the past 5 to 10 years, it is estimated that Alternative 1 would result in 1,400 new jobs and 800,000 square
feet of development.
Alternative 2
would result in approximately 6,500 new jobs and about 4 million square feet of development. It
identifies a slightly reduced boundary for the Manufacturing Industrial Center (MIC) by removing some areas in the very
southern portion next to the Mason County line. The Puget Sound Regional Council granted the MIC designation, which
is one of 8 in the region intended for intense industrial development. The PSRC’s ultimate goal for this area is 10,000
jobs.
Alternative 3
has the most aggressive growth scenario. It is estimated that Alternative 3 would result in 10,000 new
jobs and 5.5 million square feet of new development.
Ms. Munkberg
said the Preferred Alternative is essentially Alternative 2, as described in the EIS. However, the boundary of
the MIC was moved even further to the north to Lake Flora Road. The area to the south would be designated mixed
employment (ME). The ME area would provide more development flexibility by accommodating retail, office and industrial
uses. The preferred plan is an intermediate approach that recognizes future constraints and the need for additional
infrastructure over the next 20 years.
Ms. Munkberg
advised that the EIS comment period was extended an additional 10 days. The city received 12 comment
letters related to transportation mitigation, airport compatibility, planned action process, alternative preferences, critical areas
protection, subarea plan comments, and site specific issues. None of the comments fundamentally altered the conclusions
and/or analysis contained in the draft EIS. All of the comments were addressed in the final EIS by correcting scrivener’s
errors and providing additional information and clarification about transportation, critical areas, climate change, land use and
utilities. Ms. Munkberg and Mr. McIntyre reviewed each of the five sections of the draft SKIA Subarea Plan as follows:
Goals and Strategies
Ms. Munkberg
advised that the Goals and Strategies section of the draft subarea plan was cleaned up and streamlined based
on comments from the public, the TWG and the EC. Definitions of terms and a description of the public outreach process
were added.
Implementation
Ms. Munkberg
said the Implementation Section is new and contains a summary of a joint EC/TWG brainstorm meeting
where the group identified impediments to the subarea plan’s success, as well as strategic directions for the plan’s success.
The Implementation Section also includes a list of implementation strategies such as creating a multi-jurisdictional/multi-
agency steering committee to make sure everyone works together and to clearly define the goals and benefits of marketing
the area; developing a comprehensive outreach and communication strategy, building off the specific tools and methods
identified in the subarea plan; developing a specific marketing plan; tracking and monitoring the new regulations and
adapting them as needed; finding funds for the key infrastructure needed in the subarea; and adaptive management. Lastly,
the Implementation Section provides case studies from San Diego, California; Silver Bay, Minnesota; and Kalundborg,
DRAFT
Bremerton Planning Commission Minutes
27
April 17, 2012 ~ Page of
Denmark. Three major points come from the case studies: the idea that collaboration breeds success, it takes a lot of time
and patience through a spontaneous and slow evolution, and being a small town does not impede growth.
Zoning and Development Standards
Mr. McIntyre
explained that because it is important to encourage economic development in the subarea, the zoning and
development standards should be flexible, easy to use, effective to implement, and work well for both the City and the
development community/property owners. The goal is also for the subarea to be developed as a very progressive industrial
area, consistent with the EPA grant. Headvised that there are four zones identified in the SKIA Subarea:
Port Industrial Mix (PIM) Zone
The is located north of State Route 3. This zone is intended to promote both light
and heavy industrial uses, but still remain a business park form.
General Industrial (GI) Zone
The is located in the northeast and south sectors of the subarea and would be open to
most types of industrial uses.
Aviation Business (AB) Zone
The is centered around the Bremerton National Airport and is geared towards
aviation-related businesses. Although it would not prohibit other types of uses, light industrial and manufacturing uses
would be encouraged. However, the light industrial uses should not have adverse impacts with outdoor industrial uses.
Heavy industrial uses are not encouraged, but they would be allowed.
Mixed Employment (ME) Zone
The is located south of Lake Flora Road and is a more flexible zone to allow
commercial, office and retail type uses. Light industrial would be allowed, but it should not have adverse outdoor
industrial uses. Heavy industrial uses would not be encouraged in this zone.
Mr. McIntire
emphasized that all of the uses allowed in each zone must meet the intent of each zone, and all uses must be
compatible with the airport and comply with the Federal Aviation Administration (FAA) requirements and other applicable
regulations. He noted the yellow outlines on the map, which identify the six airport compatibility overlay zones, which the
city will utilize as a guidance tool as it considers appropriate use, height, and noise requirements. The staff is in discussions
regarding the use of this tool with the Port of Bremerton, the EC and TWG, and changes may be made in the future.
Mr. McIntire
advised that site development standards do not specify a maximum height restriction per zoning district.
Rather than the traditional front, rear and side yard setbacks, the proposed development standards identify external and
internal setback requirements. The idea of minimum internal setbacks is currently under review and may change before the
final draft is presented to the Commission for review and public hearing.
Mr. McIntire
said the development standards have been broken down as follows: site clearing and development; building
design; transportation, parking circulation and pedestrian access; landscaping; signs; exterior lighting; noise and emissions;
low-impact development; and right-of-way standards. He emphasized that by being flexible with height and setback, it is
important to ensure that development occurs to a standard that protects the health, safety and welfare of the public.
Mr. McIntire
explained that the right-of-way standards are proposed in the plan, and two low-impact development
streetscapes were provided for each standard (drawings and street types are still under review):
Business Serving Streets
are the lowest scale of streetscape in the SKIA Subarea. Pedestrian uses and bio-
retention/landscaping is encouraged in this streetscape.
Local Access Streets
are larger than the Business Serving Streetscapes and include parking, bike lanes and walking
pathways.
Commercial Industrial Streets
are larger still and include a potential 15-foot drive width. However, the City
Engineer will have substantial input in how these streets are actually developed.
Arterial Streets
are largest streetscapes and include two lanes of traffic both ways. They also include a center lane
for potential bio-retention and/or landscaping or a turn lane, as well as both bike and walking pathways.
Mr. McIntyre
referred to the Preferred Street Typology Map, which identifies where each of the different streetscapes would
fit best. He emphasized that the map represents a preference, but is not a regulation or requirement. The City Engineer will
have substantial input.
DRAFT
Bremerton Planning Commission Minutes
37
April 17, 2012 ~ Page of
Mr. McIntyre
said the concept of a “payment in lieu of street frontage improvements” program is currently being
considered, but it has not been included in the plan yet. He reviewed that the Bremerton Municipal Code (BMC) requires all
redevelopment projects that exceed 25% of the assessed value of the property and all new development projects to provide
street frontage improvements. Many property owners have expressed concern that this can be an onerous and costly
requirement, which could be particularly true in industrial areas where there are large, undeveloped parcels. A “payment in
lieu of street frontage improvements” program is one option for addressing the concerns of developers and property owners.
This program would allow a developer to pay into a fund an amount commensurate with the cost of the required street
frontage improvements. When the City determines there is enough need on a street for frontage improvements, the money in
the fund would be used for the development.
Sustainable Design Guidelines and Development Incentives
Mr. McIntyre
advised that the Sustainable Design Guidelines are an optional and voluntary, but strongly encouraged,
element of the subarea plan. The goal is to achieve the vision of the subarea plan, while not discouraging development. He
provided a drawing of an ideal industrial development, which includes a vegetative buffer, pedestrian connections throughout
the site, office and retail uses along the street front, shared parking, shared loading zones, limited access to break up
pathways, etc. Heexplained that the design guidelines are meant to provide specific guidance and examples of how
sustainable industrial and commercial development could be achieved. The guidelines are broken into two categories: site
planning and building design and landscape design. He encouraged the Commissioners to read the design guidelines and
forward their comments to him.
Mr. McIntyre
said the incentives program outlined in the draft subarea plan offers a voluntary approach to get property
owners and developers to achieve the vision. He briefly explained how the proposed incentive program would offer a three-
tier approach to sustainable development using six point categories: site development and building design, sustainable
transportation, environmental stewardship and habitat, low-impact development, water conservation, and energy efficiency
and alternative energy. The Tiers would be set up as follows:
Tier I would require 70 points and would offer a 10% increase in both hard surface and impervious surface
coverage. It would also provide relief from Code Section C.4.020(a).
Tier II would require 105 points and would offer a 15% increase in both hard surface and impervious surface
coverage. It would also provide relief from Code Section C.4.020(a).
SKIA Evergreen would require 140 points in addition to LEED Silver or higher and a construction waste
management plan for redevelopment projects. This category offers a 20% increase in both hard surface and impervious
surface coverage. It would also provide relief from Code Section C.4.020(a). It would qualify a developer for a building
permit fee rebate and the City’s best effort to provide a priority permit review. There would also be a press release, and
the developer would receive the Mayor’s Sustainable Development Award.
Mr. McIntyre
said the Building Permit Fee Rebate Program is a new “pilot” program that would only apply to SKIA.
Citywide expansion, if warranted, would be addressed at a later time. He explained that, as currently proposed, all
development projects that achieve SKIA Evergreen would qualify for a 30% building permit fee rebate. All building permit
fees would be paid up front, and the rebate would be issued once the City has insured the public has received the
commensurate benefit.
Capital Facilities Plan
Mr. McIntyre
pointed out that the Capital Facilities Plan (CFP) is a particularly important element of the subarea plan
because the SKIA Subarea is largely undeveloped at this time. He clarified that not only does the SKIA CFP address
transportation, water, sewer and stormwater projects, it also adheres to RCW 36.70A, which requires an inventory of existing
capital facilities, identification of future needs based on development assumptions, identification of projects to meet the
future needs, and a financial plan. The CFP must also be coordinated with the land use element in the Comprehensive Plan.
He explained that the proposed SKIA CFP is more conceptual and less specific than traditional CFPs because they do know
where development will occur in the future. It identifies general capacities and locations for future capital facilities. It also
identifies potential funding, but not commitments of specific funding. The SKIA Subarea is very large (approximately 3,700
acres) and is mostly undeveloped. It is also located in an MIC, which emphasizes manufacturing and industrial uses.
Because the subarea plan is funded by an EPA grant, it is appropriate to consider opportunities for sustainable features.
DRAFT
Bremerton Planning Commission Minutes
47
April 17, 2012 ~ Page of
Mr. McIntyre
said capital projects can be funded through traditional sources such as government and developer/property
owner funding. The City has agreed to put forth their best effort to obtain government grant funding for infrastructure
development. However, it is important to keep in mind that it could be a disaster if infrastructure development is done to
early and no development occurs for a while. On the other hand, if it is done too late, it would be difficult to attract
developers. He said the plan includes the concept of creating a Community Facilities District (CFD) which is a relatively
new tool created by the State, which is similar to a combination of a Local Improvement District and Tax Increment
Financing. The CFD program requires the support of 100% of the property owners. Because there are relatively few
property owners in the SKIA Subarea, this program is a particularly interesting option. The property owners could come
together to leverage future assessment value to get a loan to pay for infrastructure improvements.
Mr. McIntyre
provided a table that identifies the infrastructure that is needed in the SKIA Subarea including 25 road
projects, 4 water projects, and 5 sewer projects. No stormwater projects have been listed because the plan encourages low-
impact development features to be tied in with road improvements. In addition, the soils in the subarea are well suited for
water infiltration. He said the total cost of the identified projects is estimated to be $73,698,000.
th
Mr. McIntyre
Once again, advised that the next public open house is scheduled for May 7, and Commissioners are
encouraged to attend. The Commission would review an updated draft of the subarea plan and conduct a public hearing in
,
June. Two City Council study sessions are scheduled in July, with a public hearing and final action scheduled for August 1
2012.
Commissioner Mosiman Mr. McIntyre
asked about the possibility of bringing a rail line to the subarea. answered that rail
Ms.
lines exist in the area, and the design team has considered rail as a potential for importing and distributing goods.
Munkberg
said they looked at land use in the vicinity to encourage uses that locate next to the rail line to be those that could
be benefit from access to the freight line.
Commissioner Tift
asked if the Department of Corrections Westside Reception Facility that is currently being studied would
Mr. McIntyre
fit into the subarea plan. said the only prohibited uses in the subarea would be junk yards and residential as a
primary use. All other uses would be permitted outright except for adult entertainment businesses and class II group
residential facilities (residential facility for seven or more persons who cannot care for themselves). He said the current
development would be considered an essential public facility that would be allowed in the subarea as a conditional use.
Commissioner Tift Mr. McIntyre
asked if the race track is located within the subarea. answered affirmatively, and added
that the project is currently going through the development permitting process.
Commissioner Mosiman
commented that the case studies in the Implementation Section seemed to be very focused on
Mr. McIntyre
green industries. said that at the recent Developer’s Forum it was discussed that sustainability sounds good,
but it is often difficult to implement. It is difficult to balance this concern with the City’s desire for more sustainable
development, but the design team believes that sustainable development is achievable in the subarea. For example, low-
Ms. Munkberg
impact development stormwater treatment facilities can significantly improve water quality in the subarea.
added that the plan is oriented towards “green” development standards and not necessarily eco-industrial development. The
examples were cited as other potential possibilities. The intent is to encourage all types of industrial development, including
traditional development, which can be developed in a way that is more green and sustainable.
Chair Jose
said there has been some discussion amongst the EC and TWG that previous attempts at development in the
subarea were a little too focused. It has been suggested that they need to broaden the types of developers they are trying to
Ms. Spencer
reach.added that at the Developer’s Forum, it was discussed that it is good to get the regulations in place now.
However, the implementation strategies make it clear that the City cannot achieve any of the goals in the subarea plan
without further work to facilitate implementation.
Commissioner Lambert
asked if the grant requires the City to incorporate sustainable design guidelines into the subarea
Mr. McIntyre
plan. said the grant does not specifically require sustainable design guidelines, but it emphasizes reducing
Ms. Munkberg
greenhouse gases. said the City’s goal is to reduce greenhouse gas emissions by 30% over traditional
development. The EIS identifies a number of measures for accomplishing this goal, and the measures were carried over to
the subarea plan.
DRAFT
Bremerton Planning Commission Minutes
57
April 17, 2012 ~ Page of
Vice Chair Cockburn Ms. Munkberg
said the plan does not address lead pollution from aviation fuel. agreed that the plan
Vice Chair
does not address options for reducing lead pollution, but it does address carbon emissions from the airport.
Cockburn Ms. Munkberg
suggested that lead pollution could impact stormwater runoff. agreed butsaid this is an issue that
is beyond the City’s ability to regulate.
Commissioner Tift
recalled that the Kitsap Aerospace Alliance previously indicated there are 5,500 acres of undeveloped
Ms. Munkberg
land in the subarea. He asked if this calculation includes the airport.said the subarea is actually 3,700 acres,
and the roughly 1,100 of that is the airport.
Chair Jose Ms. Munkberg
asked for more information about the Planned Action EIS, and why the City chose that strategy.
explained that a Planned Action EIS is a State Environmental Protection Act (SEPA) provision that allows jurisdictions to do
the SEPA review upfront. After the SEPA review has been completed, the City will adopt an ordinance that includes the
mitigation identified in the EIS. If future development is consistent with the development type and amount evaluated in the
EIS, no further SEPA review would be required by a developer.
Chair Jose Ms. Munkberg
asked how the plan achieves the concept of “more carrots and fewer sticks.” said they have
struggled to find the right balance throughout the plan. They have landed firmly on the side of some minimal requirements
and standards that get them in the right direction, and then emphasizing incentives such as regulatory relief and building
permit rebates to encourage and support development to head in that direction.
Chair Jose Mr.
requested more information about the types of ideas that are being discussed for the “in lieu of” program.
McIntyre
said the design team had hoped for feedback from the TWG and EC groups regarding this concept, but none was
received. They will work on a proposed program for inclusion in the next draft.
Commissioner Lambert Mr. McIntyre
asked if developers would pay a portion of the capital facilities costs. said it could
be a combination of government and private investment. As per the proposed plan, more of the burden would be placed on
Ms. Spencer
developers. They will also search for federal and state grants to fund the infrastructure improvements. said that
having an adopted subarea plan will allow the City to demonstrate that they have done the necessary analysis to show where
Chair Jose
the infrastructure would go. This will make the City more competitive for grant funding. commented that by
completing the SEPA process and adopting a subarea plan, the City will have done what they can to make the subarea
attractive to developers. Developers desire certainty of permit review and are more likely to invest in infrastructure if some
of the other aspects of development entitilements have been taken care of.
There was no one in the audience who expressed a desire to provide comments during this portion of the meeting. The
workshop was declared closed.
BUSINESS MEETING
Chair Report
Chair Jose
thanked Vice Chair Cockburn for chairing last month’s meeting. He also reported that he has been very involved
in the SKIA Subarea Plan process and has attended nearly all the meetings. He also participated on the selection committee
that approved the consultant team. He observed that the staff and consultant team has done a great job of following the
guidelines and recommendations of the TWG and EC groups.
Director Report
th
Ms. Spencer
reviewed that a public workshop on the SKIA Subarea Plan is scheduled for May 7 at 4:00 p.m. The agenda
th
for the Commission’s May 15 meeting will include a public hearing for the Shoreline Master Program. Staff anticipates a
th
lot of public testimony. The June 19 agenda will include a public hearing for the SKIA Subarea Plan.
Ms. Spencer
reported that she has been without an Assistant Director since February. They are conducting interviews this
week, and she is hopeful they will find a replacement soon. It is important to make the right decision, since the position has a
big impact on her organization and the City’s operation.
DRAFT
Bremerton Planning Commission Minutes
67
April 17, 2012 ~ Page of
Old Business
There was no old business to discuss.
New Business
There was no new business to discuss.
ADJOURNMENT
The meeting was adjourned at 6:29 p.m.
Respectively Submitted by:
______________________________ ______________________________
Andrea L Spencer, AICP Greg Jose
Executive Secretary Chair, Planning Commission
DRAFT
Bremerton Planning Commission Minutes
77
April 17, 2012 ~ Page of
Commission Meeting Date: May 29, 2012 Agenda Item: V.B.1
CITY OF BREMERTON, WASHINGTON
PLANNING COMMISSION AGENDA ITEM
AGENDA TITLE:
Public Hearing on the Shoreline Master Program Update
DEPARTMENT:
Department of Community Development
PRESENTED BY:
Nicole Floyd, City Planner
EXECUTIVE SUMMARY
The Shoreline Master Program (SMP) has been a 3 year public planning process which was
mandated by the State in order to utilize extensive scientific information that was unavailable 30 years
ago when the SMP was first adopted. Staff has spent the last 3 years diligently working on
researching, documenting, and drafting revisions that meet the State guidelines and address
Bremerton’s unique environment. Through this process the Planning Commission has held 14
community workshops to discuss, deliberate, and receive public comment regarding a wide array of
topics within the Shoreline Master Program. The Technical Advisory Committee (Applicable State,
Tribal, and Local agencies) have held monthly coordination meetings, and the Citizen Advisory Group
has spent almost 2 years reviewing and recommending revisions to the code language to help make it
a user friendly, clear, and concise document that is consistent with other City regulations.
Due to the complexity and size of the document up to this point it has been reviewed by the Planning
Commission in segments. Now, the document before you is complete and includes all previous
recommended changes. All changes are identified in the document through the use of Legislative
Markup and are written in red ink to ensure they stand out.
Attachment I is a matrix that identifies the location of all changes, why the change is proposed, and
how the change is intended to improve the document. This matrix is intended to be used as a
“readers guide”.
Attachment II provides a brief summary of all written comments received over the 3 year process in
addition to the actual written comments. These comments are from a variety of sources including
citizens, developers, neighboring jurisdictions, State agencies, and interest groups. Additionally, these
comments are addressed in the “Users Guide Matrix” (Attachment I) identifying how the request has
been responded to.
STAFF RECOMMENDATION
Staff recommends that the Planning Commission conduct a public hearing on the proposed SMP
update, consider public testimony, deliberate, and forward a recommendation to the City Council for
adoption.
MOTIONS FOR CONSIDERATION
Motion:
Move to recommend that the City Council adopt the Shoreline Master Program Update as
shown in Attachment IV of this report based on the Findings and Conclusions presented in
Attachment III.
ATTACHMENTS
Attachment I – Revision Matrix
Attachment II – Public Comments
Attachment III – Findings and Conclusions
Attachment IV – Draft Shoreline Master Program
Planning Commission Public Hearing
Attachment I
Revisions Matrix
Topic / Code RequestorRequest/DiscussionProposed Amendment
Location
GeneralCity Staff, Minor modifications such Corrections have been
Planningas corrections of typo’s, made throughout the
Commission, spelling, capitalization, re-document. The majority
and Citizen wording, or and of corrections are shown in
Advisoryclarifications are necessary. underline and
Committee strikethrough, however
some very minor
corrections such as
spelling, capitalization,
and typo’s were simply
changed without tracking.
GeneralCity Staff Formatting and Some sections have been
organization is needed so re-numbered and
that all sections are formatted. These changes
numbered and are in a are not shown as tracked
logical order. changes.
20.16.200 Goals PlanningMinor modifications to Modifications have been
Commission language for clearer made and are shown in
Pages 6-7 (5.17.2011messaging were requested red.
Workshop)at the May 2011 meeting.
20.16.230(b)(7)PlanningThe code should address A policy statement has
ConservationCommission Sea Level Rise been added to ensure Sea
and Restoration (5.17.2011Level Rise is addressed in
Workshop)the next SMP Update.
Page 9 Currently there is not
enough scientific
information to create
specific regulations
regarding the topic.
20.16.300PlanningThe addition of No Net The code has been revised
DefinitionsCommission Loss, Will, and Setback to include these definitions
(11.15.2011were requested as well as and minor corrections.
Pages 19-21, 22, Workshop)minor clarification of the
& 24 term photic zone.
20.16.400Suquamish Tribe Special consideration These areas are designated
Aquatic(Letter dated should be given to shallow as aquatic conservancy
Conservancy2.23.2010)closed embayment’s such which recognizes their
as Mud Bay, Ostrich Bay unique and fragile
and Oyster Bay. ecosystems and prohibits
overwater structures such
as docks.
1
Planning Commission Public Hearing
Attachment I
Revisions Matrix
20.16.430Suquamish Tribe Designating Gorst Creek as No change proposed.
Designation of (Letter dated commercial does not Most properties are
Gorst Creek.2.23.2010)adequately address the currently commercially
functions and values of the developed. Lots are
creek. Due to the high shallow and do not offer
habitat functions the creek enough space for large
should be re-designated as buffers and development.
conservancy.The Commercial
Designation has a buffer of
50’ while Conservancy’s
buffer is 175’. In most
cases lots are not even
175’ deep. Such a buffer
would eliminate most
redevelopment
opportunities.
20.16.430(1)(2)Suquamish Tribe Increased stormwater Isolated designation is
Standards for (Letter dated controls and tree required to comply with
Isolated2.23.2010)preservation criteria should Citywide stormwater and
Designations.be added to the Isolated Critical Area regulations.
Designation. While not No change proposed.
Page 42 physically touching the
shoreline, these issues may
still impact habitat
function.
20.16.420Roger Duryea Only one developable The designation has been
Urban(Letter Dated property in Oyster Bay was changed to reflect this
Conservancy3.23.2011)given a designation of request and is identified
Designation in Urban Conservancy. Mr. thusly on the maps.
Oyster Bay Duryea has requested this
be changed to residential as
Map Bit is zoned residential and is
developable.
20.16.430City Staff The isolated designation The map of shore drive
Page 42 andneeds to be reworded, has been modified and the
clarified, and expanded to code section has been
Map D include properties beyond clarified. To indicate when
Shore Drive that are within the section shall apply and
200’ of the shoreline.that all local, state, and
federal requirements are
applicable in these areas.
2
Planning Commission Public Hearing
Attachment I
Revisions Matrix
20.16.400Citizen Advisory Elandan Gardens should be The maps have been
Elandan Gardens Committee designated as Conservancy changed to designate
Designationnot Recreational because Elandan Gardens as
the property is used by a Conservancy.
Map G “for profit” commercial
entity and does not provide
free public access.
Additionally the site is
currently designated as
conservancy, and there are
high habitat functions
surrounding the site.
20.16.510(c) & PlanningNeed to add language Language has been added
(e)Commission about shoreline exemption that indicates that a citizen
(9.20.2011permit requirements. must apply for an
Page 49, and 55 Workshop)exemption from the City in
order to do work that is
exempt from a shoreline
substantial development
permit.
20.16.510(d)City Staff Language about permit A new subsection (e) has
revisions should be added been added that identifies
Page 48 so that an applicant will when a permit revisions
know if they need a new would be permitted.
permit or if they can simply Language is taken from
revise their existing permit. the WAC about permit
revision requirements.
While already covered by
the WAC it is convenient
to have such language in
the local code.
20.16.530Suquamish Tribe Requests to review all Staff added “tribal” to the
Noticing(Letter dated shoreline applications and noticing requirement
Requirements 2.23.2010)all work waterward of the section so that it states:
OHWM. Notice to all state, federal,
Page 57 tribal, and local agencies
with jurisdiction.
20.16.600Alan Beam Name of nonconforming No change is proposed.
Nonconformities 9.21.2011should be changed due to Significant deliberation
the term’s potential impacts took place at the 3.15.2012
Page 65 Kim Ingham for lending and loan Planning Commission
11.15.2012
applications. Workshop, determining no
change should be made to
Jackie Rossworn
the name.
11.29.2011
3
Planning Commission Public Hearing
Attachment I
Revisions Matrix
20.16.640PlanningClarify the 75% rule. 75% Revised language to use
NonconformingCommission of the assessed value seems the value only for primary
(9.20.2011straight forward, but 75% structures – removing
DefiningWorkshop)of the building’s structural language about physical
Substantialcomponents is unclear. components.
Destruction
Added language to address
Page 66 accessory structures such
as decks or bulkheads that
are typically not assessed.
For these structures
replacement of 75% or
more of the structure
would equal substantial
destruction.
20.16.640(d)(3)City Staff There should be some A sentence establishing
Nonconforming timelines for the that all work conducted in
Time limit for calculation to minimize a 5 year period shall be
Substantialabuse of the provision included has been added to
Destructionthrough phasing. address this concern.
Page 66
20.16.670(d)Suquamish Tribe Repair and maintenance of Added language sets
verbal comment in-water structures should specific standards for in-
Repair and be specifically addressed as water structures
maintenance of they often present unique establishing that the
nonconforming circumstances not replacement of more than
structuresaddressed elsewhere. Look 75% of each component
to Bainbridge Island for (decking, piling, or
Page 70 language.structural member) is
measured against the 75%
rule separately because
typically they are replaced
at different times.
20.16.700EcologyUse the Ecology guidance Revised language reflects
Wetland (Letter dated document for mitigation the suggested change.
Mitigation 11.3.2011)ratios and wetland buffers.Generally this represents a
Ratiosdecrease in buffer size for
low functioning wetlands
Page 74 and an increase for high
functioning wetlands.
4
Planning Commission Public Hearing
Attachment I
Revisions Matrix
20.16.710EcologyWarns that using a 20% No change is proposed.
Buffers and (Letter dated buffer may not be With the existing
Setbacks11.3.2011)adequate and 30% is more developed and degraded
widely accepted.nature of most buffers
Page 75 Substantial rationale will within the City it is
be necessary to utilize believed that better overall
20%.function will be gained
through vegetation
enhancement required for
all new and re-
development rather than a
larger dimensional
standard.
20.16.710EcologyA minimum buffer size A minimum of 10’ has
Buffers and (Letter dated should be added been added.
Setbacks(Letter dated
11.3.2011)
Page 75
20.16.710Alan Beam A maximum buffer size Staff has added a 100’
Buffers and (Letter dated should be established.max.
Setbacks9.20.2011)
Page 75
20.16.710(1)PlanningAdd language to allow Revised language allows
(xii) Buffer and Commission buffer averaging for new for buffer averaging when
Setback(7.19.2011residential development so 60% of the houses in a
AveragingWorkshops)that a new home may be numbered block on the
located closer to the water waterward side are setback
Page 76 than the standard buffer less than the code requires.
would allow provided it is It also requires a minimum
in line with the other 10’ buffer and 5’ setback.
existing buffers on adjacent
properties.
20.16.710(2)EcologyClarify what is meant by Revised language to only
Buffer(Letter dated the exemption for water exempt the portion of the
Exemptions 11.3.2011)oriented development from development that cannot
buffers. State does not be located outside the
Page 76 recognize them as exempt buffer.
from all buffer
requirements.
5
Planning Commission Public Hearing
Attachment I
Revisions Matrix
20.16.710(b)(x)EcologyRemove language allowing Language has been
Buffers(Letter dated Low Impact Development removed.
11.3.2011)in the buffer. Language is
Page 76 generally unclear without
proper rationale.
20.16.710(b)CodeThe code should address Language has been added
(xiii)Enforcement fences in the buffer as it is to clarify when and where
Fences in buffers Officeran issue that will come up a fence would be allowed.
regularly.
Page 76
20.16.720(b)Ecology~Do not exempt water ~Removed the exemption
Vegetation(Letter dated dependent uses. for water dependent uses.
Management 11.3.2011)
~Revise tree standards ~Removed size
Pages 77- 80 because 4’ tall trees may requirement for trees.
not be likely to survive as
younger, smaller trees.
20.16.720(b)City Staff and Commercial and residential Combined commercial and
VegetationPlanningstandards seem almost the residential into one single
Management Commission same and should be section.
combined for readers ease.
Pages 77-80
20.16.720(b)CommunityVegetation is likely to ~Added language to
VegetationMembers block views and that ensure view preservation
Management (Generalplanting densities seem too as a reason to group trees.
comments to high.
Page 78 staff) ~Remove the numerical
standards for the number
of trees and shrubs.
20.16.720(b)EcologyClarify when a project is The section has been
Exemptions (Letter dated “minor” and is exempt clarified to indicate that
11.3.2011)from providing a minor expansion of an
Page 79 vegetation management existing nonconforming
plan.structure may be exempt.
20.16.670(b)PlanningMore clarity is needed to Language has been revised
(vii)Commission determine what features are to indicate the costs of the
Vegetation(7.19.2012)to be included in the bond plantings are to be
Enhancement – requirements. included.
Bond
requirements
Page 78
6
Planning Commission Public Hearing
Attachment I
Revisions Matrix
20.16.740Ecology ~ Modify language ~ The requirement for a
Public Access(Letter dated requiring a Conditional Use Conditional Use Permit
11.3.2011)Permit for reduced hours of has been removed. The
Page 83 public access as it is not a installation of the access
requirement of Ecology. will be a part of the larger
permit application, thus it
~Remove language that and a potential reduction
allows cost as a rationale in hours can be reviewed
for reduced access. all together as a whole
project.
~Cost has been removed
from the list of reason for
reduced access.
20.16.760Suquamish Tribe Recommends several All wording changes
Archaeologically (Letter Dated minor wording changes to suggested are incorporated
sensitive Areas 2.23.2011)better address cultural in the document.
resources and to identify
Pages 85-86 the Suquamish Tribe as an
authority in such matters.
20.16.790 (a) City Staff Use table is difficult to read After discussing with
Use Table and requires Conditional Ecology, Use Table has
Use Permits (CUP) in areas been revised to read easier
Page 88 - 91 that seem unnecessary and and reduces the number of
not required by the State. uses that require CUP’s.
20.16.790(b)Dana Hamar Suggests increasing Residential heights have
Height Table 9.27.2011residential heights to 28’.been increased to 35 with
Page 91 a pitched roof, 30 without.
20.16.790(b)PlanningLanguage should be Language has been added
Heights Table Commission clarified regarding gables stating that gables etc. are
2.21.2012so as to ensure they are not permitted provided such
Page 91 permitted to block views in features do not extend past
locations where pitched the pitched roof where
roofs are intended to views are intended to be
preserve views.preserved.
20.16.790 (b) Bill Broughton Heights should be No change is proposed.
Height Table 4.10.2012increased from 35’ to 80’ Increased height above 35’
for commercial and 60’ for would require substantial
Page 91 residential in the area study to ensure No Net
zoned Employment Center Loss. While downtown
to better match the zoning has heights above 35’
code.these heights are existing
in the current code.
7
Planning Commission Public Hearing
Attachment I
Revisions Matrix
20.16.880(b)(3)EcologyMatch the WAC which The section has been
Residential - (Letter dated only allows for a live-edited to remove floating
Floating Homes 11.3.2011)aboard vessel, not floating homes.
homes.
Page 106
20.16.890Puget Sound Underground utilities Code has been revised to
Utilities Energyshould not be a say that undergrounding of
(Discussion with requirement as it is often utilities is encouraged but
Page 110 Lindacost prohibitive and can be not required.
Streissguth)more environmentally
damaging than above
ground measures.
20.16.930Washington~Light penetration by way ~The code has been
(b)(14) State Ferries of grating is an unworkable revised by adding
Docks(Letter dated solution for the Ferries. language exempting
8.30.2011)Grating would allow grating when it would pose
Page 116 grease, oil, and other a public safety or
contaminants to fall into environmental risk.
the water and would not
meet the ADA
requirements for loading
and unloading ramps.
20.16.930(b)(11)Karen Danis – Clarify that mooring buoys Language has been added.
DocksCitizen Advisory are prohibited in the
Committee aquatic conservancy zone.
Page 116
20.16.930EcologyLanguage should be Language has been revised
(b)(14) (Letter dated consistent with the new to require grating over at
Docks11.3.2011)Army Corp of Engineers least 40% of dock surfaces
permit requirements. where at least 60% of the
Pages 116-117 dock has such light
penetration as is required
by the Army Corp of
Engineers permit.
8
Planning Commission Public Hearing
Attachment I
Revisions Matrix
20.16.930(b)(15)Ecology~ Need to add a statement ~ A statement has been
Residential(Letter dated noting that docks shall be added stating that the dock
Docks11.3.2011)the minimum length will be the minimum
necessary.length necessary.
Page 117
~ Dock depth should ~ The code has been
achieve 10’ to 13’ deep to revised to require 10’
reduce the risk of scouring depth.
or bottoming out of many
boats.
20.16.930(b)(15)EcologyRevisions are needed to This section has been
(iii)(Letter dated comply with the new State significantly revised to
Residential11.3.2011)standards for dock. represent the new State
Dock size ~ “T” shape is not allowed requirements.
~ Pier max width is 4’
~ Float max width is 8’
~ Landing should be north
south.
20.16.930(b)(15)EcologyJoint use docks need Joint Use Dock standards
(iv)(Letter dated specific requirements have been added to the
Joint Use Docks 11.3.2011)separate from community residential dock standards.
docks.Community docks are
Page 117 separate.
20.16.940(a)(1)EcologyReplace language with Language has been
& (2) (Letter dated alternate language that revised.
Dredging11.3.2011)more clearly explains the
intent.
Page 118
20.16.960(b)(1)EcologyAdd the word “approved” Language has been
(vi)(Letter dated for referencing restoration revised.
Landfills 11.3.2011)or enhancement projects
allowed under this section.
Page 121
20.16.980EcologyRemove first sentence to Sentence removed.
Shoreline(Letter dated reduce confusion.
Stabilization 11.3.2011)
Page 124
20.16.980(b)(2)EcologyRevise, message is unclear. Suggested language was
Shore(Letter dated Suggested language was used, additional
modifications11.3.2011)provided in letter.clarification was drafted
by Staff to help section
Page 125 read more clearly.
9
Planning Commission Public Hearing
Attachment I
Revisions Matrix
20.16.980(b)(9)Judy Friedberg – Clarify language relating to Language has been added
BulkheadsNerfbulkheads tying into noting the goal of
another for clarity. eliminating a gap between
Page 126 two structures.
20.16.980(b)(12)EcologyClarification regarding Added recommended
(iii)(b)(Letter dated when such projects would language clarifying that
Groins11.3.2011)be appropriate is needed. Federal and State
approved projects are
Page 128 appropriate.
20.16.990City Staff Remove statement 3 Statement 3 has been
Stormwater because it is unclear and removed.
unnecessary.
Page 131
Inventory and Richard NerfInformation presented on Typos and maps have been
Characterization(Letter Dated maps should be clearly corrected.
8.10.2010)labeled, typos corrected,
and colors should be
clearly differentiated.
Inventory and Alan Beam Grass is listed as having the Language has been
Characterization9.20.2011same ecological value as clarified. Grass provides
pavement. This is very little stormwater
inaccurate and should be filtration and concrete has
corrected.none.
Restoration Plan Richard Nerf Numerous inaccuracies, Significant editing has
and Cumulative (Letter dated typos, grammatical errors, taken place – documents
Impact Analysis 1.17.2012)and details need to be are substantially revised to
corrected.reflect these comments.
Judy Friedberg
NerfThe reports appear to be
(Letter dated boiler plates and do not
1.19.2012)represent Bremerton
specifically.
10
Planning Commission Public Hearing
Attachment II
Shoreline Master Program Update
Public Comment List
ITEM
/PERSON/AGENCY/AFFILIATION DATE RECEIVED
TAB NO.
1Richard Nerf – Citizen Advisory Committee/ Shoreline August 10, 2010
Property Owner
Comments on Inventory and Characterization Maps
February 23, 2010
2Allison O’Sullivan – Suquamish Tribe
General recommendations about what subjects the tribe
will be focusing on in their review
March 23, 2011
3Roger Duryea – Shoreline Property Owner
Request for Shoreline Designation change
April 15, 2011
4Theresa Nation – Department of Fish and Wildlife
Encouraging coordination and environmental protection
July 12, 2011
5Larry Matel – Bremerton Engineering Department
No concerns about proposed language for utilities
July 18, 2011
6Judith Friedberg-Nerf – Citizen Advisory Committee/
Shoreline Property Owner
Comments about clarification, typos and formatting.
Encouraging the City to take a proactive stance for
education and restoration.
August 25, 2011
7Kojo Fordjour – Washington State Ferries
Request for revised language relating to ferry docks.
August 30, 2011
8Stephanie Trudel – Suquamish Tribe
Requests alternate language relating to areas with cultural
resources.
September 20, 2011
9Alan Beam – Shoreline Property Owner
Requests a maximum buffer width, clarification of
Science, and encourages utilization of SHB 5451 by
changing the name of nonconforming structures to
conforming.
September 27, 2011
10Dana Hamar – Shoreline Property Owner
General questions and a request for heights of at least 28’.
November 3, 2012
11Barbara Nightingale – Department of Ecology
Several comments and suggested changes for the SMP
November 15, 2011
12Kim Ingham – Shoreline Property Owner
Provided information about how her bank processes loans
ITEMPERSON/AGENCY/AFFILIATION DATE RECEIVED
/
TAB NO.
on non-conformities and what the County has proposed.
November 29, 2011
13Jackie Rossworn – Kitsap Alliance of Property Owners
Bremerton should utilize Substitution Senate Bill 5451 in
relationship to nonconformities.
January 17, 2012
14Richard Nerf – Citizen Advisory Committee/Shoreline
Property Owner
Recommends correction of many typos and formatting of
the Restoration Plan and Cumulative Impact Assessment.
January 19, 2012
15Judy Friedberg-Nerf Citizen Advisory
Committee/Shoreline Property Owner
Recommends correction of many typos and formatting of
the Restoration Plan and Cumulative Impact Assessment.
April 10, 2012
16Bill Broughton – Shoreline property owner
Heights should be increased in commercial areas outside
of Downtown, specifically in the Employment District
Zone where height limits are 80’. 80’ for commercial and
60’ for residential seems appropriate rather than the 35’
proposed in the Shoreline Master Program.
Record as of May 8, 2012
Page 2 of 2
Attachment IV
Draft Shoreline Master Program:
Due to the size of the Draft Shoreline Master Program document, it is not
easily printed nor can it be emailed. The document is available at
Bremertonshorelines.com, or upon request Staff will provide you with a CD
with the document on it.