HomeMy WebLinkAbout11/20/2007 PACKET(DRAFT) AGENDA
Regular Meeting - Bremerton Planning Commission
(Subject to PC approval)
November 20, 2007
5:30 P.M.
th
345 – 6Street
Meeting Chamber – First Floor
I. CALL TO ORDER
II. ROLL CALL (quorum present)
III. APPROVAL OF THE AGENDA
IVAPPROVAL OF MINUTES:
October 23, 2007 Special Planning Commission meeting minutes.
o
V. PUBLIC MEETING
A. Call to the Public:
Public comments on any item not on tonight’s agenda
B. Public Hearing
1. Downtown Regional Sub-Area Plan
2. Non-Motorized Transportation Plan
3. 2007 Comprehensive Plan Amendment Docket
VI. BUSINESS MEETING
A. Chair Report:
Chairman Cockburn.
B. Director Report:
Andrea Spencer.
C.Old Business:
D.New Business
VII. ADJOURNMENT: The next regular meeting of the Planning Commission is
December 18, 2007
Planning Commission meeting packets are available on-line at
www.ci.bremerton.wa.us
DRAFT FOR APPROVAL ON 11/20/07
Minutes for
City of Bremerton Planning Commission
Special Meeting
October 23, 2007
I. Call to Order
Vice-Chairman Mosiman
The meeting was called to order by at 5:03 p.m.
II. Roll Call
Those present were: Commissioner Hoell, Commissioner Kennedy, Vice-Chairman Mosiman,
Commissioner Streissguth, and Commissioner Wheeler. Commissioner Kosusko and Chairman
Cockburn were excused. Quorum certified.
Also present: Andrea Spencer, Geoff Wentlandt, and Pam Ransier (DCD staff); Mike Mecham
and Larry Matel (PW&E staff); Alan Hart, Kate Howe, and John Perlic (consultants to the City).
III. Approval of Agenda
Vice-Chairman Mosiman
introduced the agenda. It was agreed by general consensus to
approve the agenda as presented.
IV. Approval of Minutes
The minutes of the Special Meeting held on September 18, 2007 were presented for approval by
A motion was made by Commissioner Streissguth and seconded
Vice-Chairman Mosiman.
by Commissioner Kennedy to approve the Special Meeting Minutes of September 18, 2007
as presented.
Called for a vote: Commissioner Hoell: Abstain; Commissioner Kennedy: Yes;
Commissioner Streissguth: Yes; Commissioner Wheeler: Yes; Vice-Chairman Mosiman: Yes.
The motion carried.
VI. Public Meeting
A.Call To The Public.
(public comments on any item not on tonight’s agenda)
Vice-Chairman Mosiman
asked if there were any comments from citizens. Seeing
none, he closed this portion of the meeting.
B. 1. Public Workshop – Downtown Regional Sub-Area Plan:Geoff Wentlandt, City
Planner
, introduced the Downtown Regional Sub-Area Plan and gave a brief history of
the sub-area plan process and explained the purpose of a sub-area plan.
Planning Commission Meeting October 23, 2007 Page 1 of 5
DRAFT FOR APPROVAL ON 11/20/07
VIA Architecture was hired by the City as a consultant to create a Sub-Area Plan for the
Downtown Regional Center. A draft of this plan had been distributed to the Planning
Alan Hart
Commission prior to this meeting. from VIA Architecture reviewed the draft
with the commissioners. His presentation of the draft plan included a Power Point
slideshow to highlight specific points in each of the six chapters of the draft plan.
Vice-Chairman Mosiman
asked if there were any comments from the public on this
item. Seeing none, he moved on to Commission discussion and comment.
Vice Chairman Mosiman
began the commissioner discussion by asking for clarity
regarding Chapter 6 and the Bonus Amenity chart, which seemed directive, and the
Bonus Incentive Program and the Bonus Amenity Program which appeared to have more
Mr. Hart
flexibility. explained that “incentive” and “bonus” were interchangeable; it
was desired to have flexibility in the program so it can change or evolve over time if
needed. Vice-Chairman Mosiman wanted to know if the term “program” denoted
Mr. Hart
flexibility or if there was a prescriptive type of program. said it would be
Geoff
assessed based on the need of the area. added that, since the Bonus Amenity
Program is new to Bremerton, it’s easier to think of the chart as more of a menu of
amenities to choose from to increase the development’s area.
Commissioner Hoell
asked about Chapter 2, Market Analysis (page 2-13), referring to a
Kate Howe
Local Improvement District. , (VIA Architecture), explained that a Local
Improvement District (LID) is a taxation vehicle where property owners in a particular
area choose to pay for public realm upgrades such as sidewalks.
Commissioner Kennedy
asked for a definition of “honest industrial material” (ED-116).
Mr. Hart
suggested using the term “authentic” to describe materials such as brick, stone,
metal, etc.
Commissioner Wheeler
referred to page 3-20 and asked for language clarification on
tower spacing, as the draft could be interpreted as requiring 80-foot towers and not 80
feet of space between towers.
Commissioner Hoell
asked what was meant with the reference to negotiating the height
Ms. Howe
of towers. said it was a determination to be made by the Design Review
Board (DRB) for flexibility.
Vice-Chairman Mosiman
asked why the draft did not allow stacked flats in the
Mr. Hart
Evergreen Park area (page 4-38). explained that stacked flats are usually
apartment buildings and the draft plan is encouraging doors that open at street level.
Geoff
added that the Evergreen Park area is primarily ground level entrances on single-
family residences and the draft plan proposes increasing the density while visually
Vice-Chairman Mosiman
maintaining the character of the existing neighborhood.
asked for a change in language rather than an outright prohibition.
Commissioner Wheeler
asked for clarification of the unlimited tower height (Chapter 4,
Mr. Hart
page 2, Figure 4.4). explained that it was intended to be provocative, but felt it
would be a good marketing tool; construction type would definitely limit the height of a
Planning Commission Meeting October 23, 2007 Page 2 of 5
DRAFT FOR APPROVAL ON 11/20/07
structure, as well as the number of amenities that could be implemented to achieve higher
Geoff
building heights. added that a lot of it has to do with the desired building form.
It’s easy to focus on the height limit, but the tools available through the Amenity Bonus
Program don’t just allow a tall building; a full range of public benefits have to be
included in order to achieve the taller building heights. This new format encourages tall
slender towers with multiple public amenities rather than the old form of development,
Mr. Hart
filling the entire property and just increasing height. stressed that the
development is based on quality and not just bulk.
Commissioner Streissguth
expressed concern regarding the proposed building heights
in the Downtown Regional Center Sub-Area Plan and how this could affect the
population allocations for other centers within the city. Mr. Hart acknowledged her
concern and explained that cities have goals that can be adjusted along the way to achieve
the desired balance. He felt that, at this point in time, Bremerton needs a catalyst to begin
development and adjustments to the plan can be made once the momentum is going.
Geoff
offered to have build-out numbers available to the commissioners by the next
Planning Commission meeting.
Vice-Chairman Mosiman
asked if there were any comments from the public on this
item.
Patricia Graf-Hoke, Bremerton:
Ms. Graf-Hoke spoke briefly about the zoning for the
Evergreen Park area which, at the time she purchased her property, had been zoned
Mixed Use. She thought it had been changed to Single Family Residential (R-10) and
wanted to know what the long-term use of that area would be. Staff explained that the
area she was speaking of currently allows for mixed-use development.
Vice-Chairman Mosiman
asked if there were any further comments from the public on
this item. Seeing none, he closed this portion of the meeting.
2.Public Workshop – Non-Motorized Transportation Plan:Mike Mecham, City
Engineer
, introduced the Non-Motorized Transportation Plan. He reminded the
commissioners and audience that many of the items included in the proposed plan would
not come about in the near future but were important enough to note. Funding for city
improvements such as sidewalks and trails comes from the city budget as well as grant
opportunities. The purpose of the non-motorized transportation plan is to create a more
livable community; a socially healthy neighborhood is one where there are pedestrians
and bicyclists taking advantage of the amenities provided in their area. Stakeholders
were included in the planning process; these stakeholders included the school districts,
Puget Sound Naval Shipyard, the West Sound Bicycle Club, Olympic College, Kitsap
County, and Harrison Hospital. Two open houses were conducted to engage the
community as well. Mr. Mecham’s presentation highlighted areas of the city that needs
improvement and reviewed the plan to correct and enhance the non-motorized portion of
Bremerton’s transportation problems.
Commissioner Streissguth
asked why the boardwalk extension did not appear in the
summary of the non-motorized transportation plan the commissioners had received.
JohnPerlic, Parametrix
explained that the boardwalk extension is included but could
Planning Commission Meeting October 23, 2007 Page 3 of 5
DRAFT FOR APPROVAL ON 11/20/07
not be identified on the small maps; it would appear more clearly on a map that is 11” x
17”. In addition to the boardwalk, there are plans to construct a “bridge-to-bridge” loop.
Vice-chairman Mosiman
suggested making a continuous trail from Austin Drive
Larry Matel, Public Works &
through N.A.D. Park and on to Kitsap Way.
Engineering
, said that was a mapping error and a continuous trail currently exists, but
coordination with Puget Sound Energy would be needed to make the trail accessible to
pedestrians and bicyclists.
Vice-Chairman Mosiman
asked if there were any comments from the public on this
item.
Shirley Ryan, Marine Drive:
“I’ve lived on Marine Drive for over 50 years and we
definitely need a walking path. We’re not asking for a sidewalk, we’re just asking for an
extension in the road that is flat and that we can walk, ride. I have a husband in a
wheelchair, and so it’s very difficult to deal with it. The City has come through every
year and cleaned out the gutters, which is great, [but] they’ve also widened the gutters
and in some areas there’s maybe a foot [wide] shoulder. So it really is difficult, so I hope
that something and be done. There’s probably 50 to 75 people out every day, rain or
shine, that are running, walking.Please consider Marine Drive.”
Mr. Mecham
acknowledged that Marine Drive needs improvement and explained that it
is included in the Non-Motorized Transportation Plan to improve that area for pedestrians
and bicyclists once funding is in place.
th
Kevin Koski, 13 Street
: Mr. Koski commented that, as an active pedestrian in the City
of Bremerton, he noticed that many sidewalks are encroached upon by vegetation. He
suggested a community outreach of some kind to reclaim that lost space, referring to it as
a “sidewalk recovery program”.
Dianne Robinson, Bremerton
: “I just wanted to find out a little more about the
sidewalks, especially the ones in Anderson Cove because we have a lot of children in that
area. There’s not any sidewalks – there’s only a few and I’m really interested in finding
out if that is going to be included in this non-motorized plan.”
Mr. Mecham
referred to a map showing areas of the city that are in need of improved
sidewalks and showed that Anderson Cove was recognized as one of those areas once
funding is established from Washington State’s “Safe Routes to Schools” fund.
Vice-Chairman Mosiman
asked if there were any further comments from the public on
this item. Seeing none, he closed the Public Meeting.
VI. Business Meeting
A.Chairman’s Report:
None.
Planning Commission Meeting October 23, 2007 Page 4 of 5
DRAFT FOR APPROVAL ON 11/20/07
B.Director’s Report: Andrea Spencer, Director of Community Development,
reported
that the City Council had adopted the Wheaton/Riddell Sub-Area Plan. The Manette area
is next neighborhood slated for a sub-area plan.
C.Old Business:Pam Ransier, Planning Commission Clerk,
reviewed the proposed
changes to the 1996 Planning Commission Bylaws. This item had been brought before
the Planning Commission at the August, 2007, meeting. The proposed changes consist of
thth
changing the meeting place from 239 - 4 Street to 345 – 6 Street; removing Appendix
A and any reference to it; and reformatting the agenda to reflect the order currently used
A motion was made by Commissioner Kennedy and
by the Planning Commission.
seconded by Commissioner Hoell to approve the City of Bremerton Planning
Commission Rules & Bylaws revised in August, 2007.
Called for a vote:
Commissioner Hoell: Yes; Commissioner Kennedy: Yes; Commissioner Streissguth:
Yes; Commissioner Wheeler: Yes; Vice-Chairman Mosiman: Yes. The motion carried.
D.New Business: None.
VII. Adjournment
Meeting was adjourned at 7:00 p.m. The next Regular Meeting is scheduled for November 20,
2007.
Respectfully submitted by:
_______________________________________
Andrea Spencer, Executive Secretary
Approved by:
_______________________________________
John Cockburn, Chairman
Planning Commission Meeting October 23, 2007 Page 5 of 5
Commission Meeting Date: November 20, 2007 Agenda Item V.B.1
CITY OF BREMERTON, WASHINGTON
PLANNING COMMISSION AGENDA ITEM
AGENDA TITLE:
Public Hearing on the Downtown Regional Center Sub Area Plan
DEPARTMENT:
Department of Community Development
PRESENTED BY:
Geoffrey Wentlandt, City Planner
EXECUTIVE SUMMARY
Enclosed for Planning Commission review is a Draft of the Downtown Regional Center Sub Area
rd
Plan. The Commission conducted a workshop including public comment during the October 23
meeting. The Planning Commission meeting and public hearing is being conducted on November
th
20, 2007.
The Sub Area Plan includes two primary components: 1) an amendment to the 2004 Bremerton
Comprehensive Plan adding the Downtown Regional Center Sub Area Plan and, 2) development
regulations for the Downtown Regional Center that will function as zoning upon Plan adoption.
The Downtown Regional Center is approximately 130 acres in the core historic center of the City. The
2004 Comprehensive Plan designated the extent of the Downtown Regional Center (DRC).
Downtown Bremerton is also designated as 1 of 5 Regional Metropolitan Centers in the PSRC Vision
2040 regional growth strategy. While comprehensive and regional plans call for downtown to become
the ‘Metropolitan Center of the West Puget Sound’, a clear and detailed urban design strategy for
greater downtown had not been developed at the time of the 2005 zoning code adoption. In the
interim a ‘stopgap’ zoning scenario was put in place for greater downtown. In 2006 City Council
funded work on a Downtown Sub Area Plan to ensure that future redevelopment of the downtown is
coordinated and well designed.
Extensive community and stakeholder meetings were held on the Sub Area Plan between the Spring
of 2007 and the present. A Draft Plan was completed by the consultant in early October. Copies of
the Draft can be viewed at the Bremerton City Hall, and on the City of Bremerton Web Page.
STAFF RECOMMENDATION
Staff advises the Planning Commission to conduct a public hearing, consider public
testimony, and formulate a recommendation to the City Council for adoption of the Downtown
Sub Area Plan and a text amendment to Chapter 20.80 of the Title 20 Zoning Code to
activate the development standards of the Downtown Sub Area Plan.
MOTION FOR CONSIDERATION
Move to recommend to City Council an amendment to the Bremerton Comprehensive Plan
(Attachment I)
adding the Downtown Sub Area Plan ,and an amendment to Zoning Code
Chapter 20.80 to activate the development regulations of the Downtown Sub Area Plan
(Attachment II)Attachment III)
based on the Findings and Conclusions (.
1
INTRODUCTION
The Downtown Sub Area Plan (Attachment I) is a detailed planning document that fits within the
framework of the 2004 Comprehensive Plan. This is the most complex and already-developed of the
areas undertaken for Sub Area Planning since adoption of the Comprehensive Plan. As a result, the
Plan document is extensive and complex. To date several Planning Commission workshops have
been held, and comments and revisions from a range of sources are incorporated in the attached Sub
Area Plan.
ANALYSIS
The basic requirements for a Sub Area Plan are met and exceeded as follows.
Comprehensive Plan Consistency – Chapter 1 addresses Comprehensive Plan policy consistency.
As with other Sub Area Plans, overall development intensity called for in the Sub Area Plan is not
expected to exceed the threshold evaluated at the time of the Comprehensive Plan. The Sub Area
Plan focuses on providing a detailed urban design framework for the already planned density. Staff
will conduct a separate limited buildout analysis on the revised zoning for documentation purposes.
Public Participation Process –Chapter 1 addresses the public participation process. In sum, 3
public open houses and a wide range of stakeholder meetings were held over the course of 8 months.
Extensive community input is integrated throughout the plan, meeting and exceeding requirements.
Development Standards – Chapter 6 includes detailed development standards to function as zoning.
These standards introduce a high level of review on design of new projects in downtown. Flexibility is
introduced, as all standards except for height are negotiable through a design review board process.
The development standards in the most intensive zones are structured with a system of bonuses to
encourage provision of public amenities.
Street Typologies – Chapter 5 of the document includes a series of typologies for streets and
introduces a systems approach for the downtown street grid. Each street is assigned a ‘type’ based
on its characteristics. And for each ‘type’ a desired set of streetscape standards are identified. With
new development, and through city-initiated projects streets in downtown will be upgraded according
to the typologies over time. The overall focus on street typologies is pedestrianization and multi-
modal options.
Additional Traffic Study – Since the suggested typologies imply some traffic revision,
additional analysis on traffic flow is required. A related study in partnership with the
Engineering department is being conducted to ‘test’ the streetscape typologies to ensure fluid
traffic movement with streetscape upgrades under the prescribed buildout. Findings can be
used to modify the proposed typologies as necessary at the time of City Council review. The
additional traffic study for the downtown core is also ongoing. Instead of requiring new
developments to do their own site-specific traffic analyses. The City is choosing to require a
flat fee contribution to an in-house traffic study of the downtown street grid system.
SEPA
Adoption of development regulations and amendments to the Comprehensive Plan require evaluation
of environment impacts through the State Environmental Policy Act (SEPA) process. Because the
Sub Area Plan is an area-wide land use action tied to an overall plan (not site-specific) SEPA review
is treated as a “non-project action”. In the coming weeks the City expects to issue a SEPA
Determination of Non-Signifigance (DNS) on the Plan. The action does not have a significant impact
on the environment because the threshold of development is within the intensity already evaluated at
the time of the 2004 Comprehensive Plan Environmental Impact Statement. No significant
development capacity is being added. The DNS on the non-project action requires statutory notice,
2
review and appeal periods which the City will complete in advance of the Commission’s November
Hearing on the Plan.
OPTIONS
1. Forumulate a recommendation to the City Council for adoption of the Downtown Sub Area
Plan.
2.
Continue the public hearing on the Downtown Sub Area Plan to a future date for additional
review.
ATTACHMENTS
Attachment I: Staff RecommendedDowntown Sub Area Plan
Attachment II: Staff recommended text amendments to Title 20.80.080 MD Zone to activate the
Downtown Sub Area Plan
Attachment III: Findings and Conclusions – Downtown Sub Area Plan
Attachment IV: Downtown Sub Area Plan Buildout Analysis Memorandum
Attachment V: Record of Comments & Revisions Since 10/23 Planning Commission Workshop
3
DEPARTMENT OF
COMMUNITY DEVELOPMENT
M
EMORANDUM
To:
Planning Commissionssion
From:From:
Geoffrey WentlandtGeoffrey Wentlandt
Date: Date:
November 13, 2007November 13, 2007
Re: Re:
Buildout Analysis Downtown Sub Area PlanBuildout Analysis Downtown Sub Area Plan
This memorandum is to document how projected buildout per the draft Downtown Sub Area Plan
(dated 11/20/07) is consistent with and within the general growth parameters established with the
2004 Bremerton Comprehensive Plan.
2004 COMPREHENSIVE PLAN
General Background
The 2004 Comprehensive Plan has a 20 year planning horizon. This is important because the
allocated population and employment growth targets are projected to be met during the timeframe
ending in 2024. Population and growth targets are specific numbers assigned by a state and county
process. Land use planning is meant to accommodate target growth numbers. In many cases the
Bremerton Comprehensive Plan has a full or ‘ultimate’ buildout of a land use designations with
capacity greater than the specific growth target. This is to reflect that most of Bremerton is already
developed, and redevelopment will only occur on select parcels over time according to site conditions
and market factors. Therefore land use designations may reflect an ultimate 50 or 75 year buildout
beyond the horizon of the Comprehensive Plan. This delay is quantified in the Comprehensive Plan
with the use of generous ‘market factors’ in the technical appendices.
The Downtown Regional Center (DRC) boundaries were formally established in the City of
Bremerton Land Use Map (pg. 84). They are identical to those evaluated in the Downtown Sub Area
Plan with the exception of two small additions. The DRC area of roughly 130 acres was established
by this 2004 Land Use Map.
General Policy Directives on Density
In the Land Use descriptions (pages LU 50–60), which lay out policy and density parameters for each
of the land use designations, the DRC is perhaps the least clearly defined. Density is listed as “40
units per acre (Requires future review).” Height is described as “Consistent with current zoning
heights for downtown, details to be added”. Policy direction is stated “Create and revitalize the
downtown as the premier urban center of the West Sound region, providing jobs, residential
opportunities, and cultural and economic activities.” The DRC land use description clearly leaves
room for more specific interpretation during a follow on Sub Area Plan effort. An interim zoning
scenario was put in place given the leeway afforded for implementation of the DRC. It was based
generally on the zoning in place prior to the 2004 Comprehensive Plan’s adoption. A quantitative
analysis follows, but first a description of how the proposed development regulations meet the intent
of the Comprehensive Plan’s general density, height and policy parameters is described.
The Comprehensive Plan’s overall density target of 40 dwelling units per acre for the DRC is
reflected in the Sub Area Plan. A sizeable portion of the DRC retains zoning that is below the 40 unit
/ acre parameter. A “One and Two Family” (R-20; 22 acre) designation is retained. Several other
areas of the DRC retain zoning for buildouts at or below the 40 unit per acre range. The Multi Family
(MR-1 & MR-2; 37 acres), Pedestrian Oriented Mixed Use (POMU; 20 acres), and the Transit
Corridor (TC; 4 acres) all reflect a townhouse or stacked flat building types that is likely to create
between 30 and 40 units per acre. In the MR-1, the Waterfront and Highland overlays limit density to
the 30 unit / acre range. In the POMU and TC ground floor commercial reduces residential density.
To balance for areas allowed to build out below the 40 unit per acre parameter, the Downtown Core
(DC; 22 acres) and Downtown Waterfront (DW; 13 acres) allow development of a density significantly
greater. Tower type development in these zones enables buildings with development densities in the
range of 80 – 175 units per acre. The DW and DC areas cover only 9 blocks, with many parcels
already built out with buildings such as the Admiral Theatre, D-4 building, Norm Dicks Government
Center and Harborside Conference Center, which are unlikely to redevelop. Development within the
DC and DW could also be primarily commercial or office instead of residential. The only other zone
in the Sub Area Plan, the Employment District (ED; 12 acres) prioritizes commercial uses over
residential, limiting residential density. So in general terms, densities allowed under the proposed
Downtown Sub Area Plan on balance approximate the residential density target of 40 units per acre
identified in the 2004 Comprehensive Plan.
Building heights per the Downtown Sub Area Plan also meet the general Comprehensive Plan
directive of “Consistent with current zoning heights of downtown, details to be added.” The
referenced zoning heights ranged from single family heights in the Cogean / McKenzie area, to 120’
in the Highland / Pleasant neighborhood and most of the Downtown, 70’ in the downtown waterfront
th
area, and 60’ on Pacific Ave. north of 6 Street. The Sub Area Plan includes heights within this
general range, with a much greater level of detail and design attention. The Sub Area Plan includes
heights in some areas below the referenced prior heights, such as in the Highland / Pleasant area
and the Employment District zone. And to balance, the Sub Area Plan allows for greater heights in
the Downtown Core and Waterfront zones if public amenity is provided.
Incentives and the bonus amenity program in the Sub Area Plan are intended to execute the
Comprehensive Plan policy language calling to “Create and revitalize the Downtown as the premier
urban center of the West Sound…”. The program will ensure that a top quality public realm is
created in conjunction with new development.
Page 2
QUANTATIVE BUILDOUT ANALYSIS
2004 Comprehensive Plan
Land Use Tables 1 and 2 and text in the technical appendices to the 2004 Comprehensive Plan
13,000 additional residents are projected
quantify buildouts and growth projections. Citywide,
with approximately 7,475 in Centers and 5,600 distributed in infill development locations.
Commercial square footage is projected for the Downtown Regional Center and other centers within
LU Appendix Table 1 and 2. A wide range is projected for the DRC because demand for commercial
space is difficult to predict. After a market factor of 50% for the 20 year horizon is applied, new
810,000 GSF
commercial space (both office and retail) is projected at about . New employment is
projected for a low of 652 to a high of 1630.
Land Use appendix Tables 1 and 2 also detail residential buildout among centers. A total of 2,664
new residents are assigned to the DRC, and a market factor of 50% is applied, resulting in a
1,332 new residents
projection of within downtown after the 50% market factor is applied. At 2.2
residents per housing unit this is about 605 units.
Limitation of Comprehensive Plan Buildout Assumptions
The 2004 Comprehensive Plan appears to have left considerable room for future Sub Area Planning
of the downtown when buildout calculations were prepared. A close read reveals that the buildout
analysis for the DRC covered only a 37 acre sub-portion of the DRC. (The full geography of the DRC
designation is 130 acres as described above.) The 37 acres covered only the Downtown Waterfront
and Downtown Core area as far west as Pacific Ave. – those areas addressed in the 2002
‘Calthorpe’ illustrative revitalization plan. Because of the undefined nature of the land uses, and the
need for future Sub Area Planning, the buildout projections left the DRC ‘edges’ out of the centers
buildout calculation. As a result the calculation shows a high proportion of commercial development
(encouraged in the DC and DW areas) and a relatively low amount of residential development. The
primarily residential portions of the downtown (Highland / Pleasant, Evergreen Park and
Cogean/McKenzie) are not covered by the DRC buildout calculation in the 2004 Comprehensive
Plan. Therefore, when buildout projections are prepared for the DRC as a whole, we should expect a
projection of commercial space that is roughly on par with the 2004 projection, but a residential
projection that is somewhat greater. This is the case as quantified below.
SUB AREA PLAN BUILDOUT ANALYSIS
A new buildout analysis is prepared with the Downtown Sub Area Plan and is summarized in the
attached table. The Sub Area Plan analysis is more detailed than the overall Comprehensive Plan
growth projection. The acreage of each of the Sub Area Plan’s new zone designations is calculated
in GIS. Full buildout of all parcels in the Sub Area is estimated for each zone. Then a market factor
consistent with the Comprehensive Plan is applied. This arrives at a 20 year buildout total for all land
within the Downtown Sub Area. But in order to provide a comparison with the growth projections of
the Comprehensive Plan (which tabulated new or additional growth only), netting out the amount of
existing development is required. After subtracting the estimated existing DRC commercial space
and population from the ultimate buildout, projected Sub Area Plan DRC growth figures are arrived
at.
Page 3
additional 831,836 GSF of commercial
Resulting growth projection per the Sub Area Plan are: an
spaceadditional 801 units of housing
, and an for an additional 1,762 residents. As anticipated,
the amount of commercial growth is on par with the 2004 Comprehensive Plan projection of 810,000
GSF. The Sub Area plan projection is just 2.7% higher. And as anticipated the amount of residential
development projected per the Sub Area Plan is somewhat higher than the Comprehensive Plan
projection of about 600 units. The Sub Area Plan projection shows increased expected residential
development by about 32%. This additional residential development is largely due to the fact that the
Comprehensive Plan did not account for growth in the MR, R-20, or POMU areas within its projection
for the DRC.
CONCLUSION
New development standards associated with the proposed Bremerton Downtown Sub Area Plan do
not call for significantly increased development in the DRC compared to what was projected at the
time of the 2004 Comprehensive Plan. Projections for new commercial space in the Downtown Core
and Waterfront areas are very similar to the 2004 Comprehensive Plan projection. Residential
development capacity is roughly 1/3 greater than projected by the 2004 Comprehensive Plan.
However, the increase is due to land area not included in the original DRC projection for lack of
information and detail on implementing zoning. The Downtown Sub Area Plan clearly meets the
intent and policy direction as laid out in the land use chapter of the 2004 Comprehensive Plan. The
minor increases in development capacity within downtown are consistent with the Comprehensive
Plan’s intent to prepare more detailed Sub Area Plan standards for downtown that would detail
zoning.
Page 4
ûèèûùôï÷îèóó
FINDINGS AND CONCLUSIONS
OF THE CITY OF BREMERTON PLANNING COMMISSION
Summary
– Proposal to include the Wheaton-Riddell Sub Area Plan in the
Comprehensive Plan and Zoning Code by amendment. The Zoning Code will add
reference in BMC 20.80.080 to activate the Wheaton-Riddell Sub Area Plan as
development regulations for the area.
I. FINDINGS OF FACT
1. Project Description
The Wheaton-Riddell Sub Area covers a 106 acre site in East Bremerton containing a
range of existing commercial structures, and two separate 20+ acre tracts of
undeveloped land. Wheaton-Riddell was designated a District Center in the 2004
Comprehensive Plan. Extensive community and stakeholder meetings were held on the
Wheaton-Riddell Sub Area Plan between the Fall of 2006 and the present.
The Wheaton-Riddell Sub Area Plan was created in partnership between the City of
Bremerton and Eberharter Architects, a project proponent for the City Villa
development. The Wheaton – Riddell Sub Area Plan is somewhat unique because the
process was driven by a design team with development interest in a specific location
within the Sub Area (City Villa). However, because Sub Area urban design must
function for the district as a whole the design team was required to partner with the City
to review and plan for the full extent of the District Center.
The Wheaton-Riddell Sub Area Plan details the 2004 Comprehensive Plan. Urban
Design concepts and development regulations are included to ensure consistency with
the goals, policies and descriptive statements in the Comprehensive Plan.
2. Procedural History
A public participation process for the Wheaton-Riddell Sub Area Plan has been ongoing
since Fall of 2006. The Sub Area Plan includes documentation of the Public Design
Process (Pgs. II-6 – II-10). A series of public open houses, and public workshop type
meetings were held during various stages of the planning process. To solicit public
participation notice was mailed to residents within 1,000 ft. of the site, published in the
Kitsap Sun, and publicized through other outlets. Participation for the Sub-Area Plan
has met and exceeded that required per BMC 20.80. Meetings were held as listed
below.
Bremerton Planning Commission
2.1 Public Open House #1 – 9/5/2006
2.2 Public Workshop #2 – 10/14/2006
1
2.3 Public Workshop #3 – 10/24/2006
2.4 Transportation Stakholders Meeting – 11/30/2006
2.5 Public Open House #4 – 7/31/2007
Bremerton Planning Commission
2.6 Hearing: August 21, 2007.
3. Public Comment
Numerous individuals, groups, and agencies provided comments at public
workshops, community meetings, and via comment cards and letters. Comments
received were considered and used to develop the draft plan that was submitted to
the City on August 13, 2007. Record of participants in community meetings is
provided in Exhibit A to this Planning Commission Findings of Fact and Conclusion.
A general summary of public participation is documented on pages 11-6 – 11-10 of
the Sub Area Plan.
4. SEPA Determination and Environmental Review
Adoption of development regulations and amendments to the Comprehensive Plan
require evaluation of environment impacts through the State Environmental Policy Act
(SEPA). The Wheaton-Riddell Sub Area Plan is a non-project action considering
general planning level items and land use regulations. A SEPA checklist has been
prepared with the Sub Area Plan submittal. The City issued a determination of non-
significance (DNS), which is in the public comment and appeals process at the time of
Planning Commission review. Since development is within the parameters set forth in
the 2004 Comprehensive Plan no additional environmental impact was found with
adoption of the more detailed Plan element and development standards.
Amendments to the Comprehensive Plan and development regulations also require a
60 day State Agency Review and Comment Period. The document has been forwarded
th
to state agencies and the review period commenced on July 18, 2007.
At the time of preliminary plat application and building permits for the City Villa project a
project level SEPA review will be required.The project level review considers project
level impacts such as grading and stormwater conveyance etc.
5. Comprehensive Plan Consistency
Amendments to the Comprehensive Plan
Amendments to the Comprehensive Plan shall meet the decision criteria outlined in
BMC 20.10. The Planning Commission may recommend, and the City Council may
adopt or adopt with modifications, an amendment to the comprehensive plan if the
criteria outlined below are met. The proposal is to add the Wheaton-Riddell Sub Area
Plan to the Bremerton Comprehensive Plans as an amendment, providing more specific
and detailed planning for the area.
2
5.1 BMC 21.06.080(A) allows amendments to the Comprehensive Plan if there is an
obvious technical error.- Not applicable to this project.
5.2BMC 21.06.080(B) allows amendments to the Comprehensive Plan if the
following criteria have been met.
5.2 (1) The amendment is consistent with the Growth Management Act (GMA):
This amendment is consistent with the GMA by meeting the criteria of the
Comprehensive Plan which was created to achieve the 13 goals of the GMA.
The Sub Area Plan meets the housing goal by providing a mixed use, mixed type
dense housing stock. It meets the open space and recreation goal by creating
green streets, and a coordinated open space system. It will reduce sprawl and
promote urban growth by creating a dense mixed use environment.
5.2 (2) The amendment is consistent with the comprehensive plan or other goals
or policies of the City:
The Wheaton Riddell Sub Area Plan is consistent with the Comprehensive
Plan Land Use Map designation of District Center. Pages II-4 and II-5 identify
specific goals and policies of the 2004 Bremerton Comprehensive Plan that are
met by this proposal for Wheaton-Riddell. Specific policies directly implemented
are found in the Land Use, Community Character, Transportation, Housing and
Environment elements of the Comprehensive Plan.
5.2 (3) If the amendment was reviewed but not adopted as a part of a previous
proposal, circumstances related to the proposed amendment have significantly
changed, or the needs of the City have changed, which support an amendment;
This amendment supplements and implements the Comprehensive Plan.
It is based on the direction of the Comprehensive Plan to develop specific area
plans for Center districts, and impacts are within the thresholds of the 2004
Comprehensive Plan evaluation.
5.2 (4) The amendment is compatible with existing or planned land uses and the
surrounding development pattern;
The Wheaton-Riddell Sub Area Plan is compatible with adopted District
Center land use and the surrounding development pattern.
5.2 (5) The amendment will not adversely affect the City’s ability to provide urban
services at the planned level of service and bears a reasonable relationship to
benefitting the public health, safety and welfare.
The Wheaton-Riddell Sub Area Plan will not adversely affect the City’s
ability to provide urban services at the planned level of service. The amendment
will benefit the public health, safety and welfare by achieving numerous City
goals and policies, especially in the areas of Community Character (CC) and
Land Use (LU), by promoting vibrant, cohesive neighborhoods, that are transit
supportive.
3
6. Amendment to the Zoning Code
An amendment to the Zoning Code, BMC 20.80.080 Master Development, is proposed
to accompany adoption of the Wheaton-Riddell Sub Area Plan. This amendment adds
a reference to the Ordinance adopting the Sub Area Plan, thereby activating the
development standards contained in the Plan as the zoning for the site.
Zoning code text amendments shall meet the decision criteria outlined in BMC
20.18.020 (d). The Planning Commission may recommend, and the City Council may
adopt or adopt with modifications, an amendment to the zoning code text if the criteria
outlined below are met.
5.3 (1) 20.18.020 allows amendments to the Zoning Code if it is consistent with the
goals and policies of the Comprehensive Plan.
See discussion in 5.2 above for consistency with the Comprehensive Plan, and
pages ii-4 and ii-5 of the Sub Area Plan. The Wheaton-Riddell Sub Area Plan is
fully consistent with the Bremerton Comprehensive Plan.
5.3 (2) 20.18.020 allows amendments to the Zoning Code if it does not conflict with
other City, state and federal codes, regulations and ordinances.
The Wheaton-Riddell Sub Area plan does not conflict with any other regulations.
II. CONCLUSIONS & RECOMMENDATION
Based on the findings above, the Planning Commission concludes that the Wheaton-
Riddell Sub Area Plan has met the requirements for 1) amendment to the
Comprehensive Plan and 2) text amendments to the zoning code as detailed in BMC
20.80. Therefore the Commission recommends the amendment to the Comprehensive
Plan to include the Wheaton-Riddell Sub Area Plan and an amendment to the zoning
code text in BMC 20.80 to include the Ordinance number of the Wheaton-Riddell Sub
Area Plan.
Respectfully submitted by:
__________________________
Executive Secretary
Approved by:
__________________________
John Cockburn, Chair
4
Commission Meeting Date: November 20, 2007 Agenda Item V.B.2
CITY OF BREMERTON, WASHINGTON
PLANNING COMMISSION AGENDA ITEM
AGENDA TITLE:
Review Draft Non-Motorized Transportation Plan
DEPARTMENT:
Department of Public Works and Utilities
PRESENTED BY:
Mike Mecham
EXECUTIVE SUMMARY
Staff is pleased to present the Draft Non-Motorized Transportation Plan for review and
comment. Please refer to the full Non-Motorized Transportation Plan document distributed
during the October 23, 2007 Planning Commission meeting. The plan presents a vision for a
fully developed bicycle and pedestrian system to be implemented over the next 20 years. The
plan goal is to increase overall pedestrian and bicycle facility connections in the City of
Bremerton to make walking and bicycling a safe, comfortable, and attractive travel mode for
residents, workers, commuters, school children, and visitors.
The plan identifies a long list of projects and programs to transform Bremerton into a premier
bicycling and walking community. The projects and programs would be implemented over the
next 20 years in a phased approach. To establish momentum towards implementing the full
list of recommendations, the plan identifies several key strategies for early implementation
including:
Implementing bikeway and walkway projects along the Mosquito Fleet Trail
Developing and implementing a wayfinding signage plan
Implementing “Safe Routes to School” pilot projects
Updating Municipal Code requirements for bicycle parking
Establishing a new staff position in the Street Maintenance section dedicated to
implementing low cost signing, striping, and other pedestrian and bicycle facility
projects
MOTION FOR CONSIDERATION
Move to recommend the Non Motorized Transportation Plan per Attachment I to City Council
for adoption.
ANALYSIS
The Non-motorized Transportation Plan is a more detailed planning document that fits within
the framework of the Transportation Element of the Comprehensive Plan. The Non-
motorized Transportation Plan identifies a more detailed and comprehensive list of pedestrian
and bicycle improvement projects.
1
Comprehensive Plan Consistency – The Transportation Element of the Comprehensive
Plan currently contains a relatively brief section describing the existing non-motorized
transportation system in the City of Bremerton and a limited number of planned
improvements. The Non-motorized Transportation Plan would replace this section of the
Transportation Element.
Public Participation Process – A public participation process for the Non-Motorized Plan
has been ongoing since March of 2007. The Plan includes a summary of stakeholder
interviews, public workshops, and open houses held during plan development. To solicit
public participation, notice was published in the Kitsap Sun and publicized through other
outlets. Participation for the Non-motorized Transportation Plan has met and exceeded that
required per BMC 20.80.
Plan Implementation – Once adopted, the Non-motorized Transportation Plan will become
an integral part of the City’s Transportation Element of the Comprehensive Plan. The plan
also includes some recommendations that would require subsequent amendments to specific
requirements in the zoning code. Projects and programs identified in the plan would be
implemented by the City Department of Public Works and Utilities through the Six-Year
Transportation Improvement Program. Federal, State, and Regional funding sources would
also be pursued through various grant programs to implement some of the projects and
programs.
SEPA & Agency Review
Adoption of Comprehensive Plan amendments requires evaluation of environment impacts
through the State Environmental Policy Act (SEPA). The Non-motorized Transportation Plan
is a non-project action considering general planning level items. The SEPA checklist will be
prepared with the Non-motorized Transportation Plan submittal. We will seek a
determination of non-significance (DNS), and the public comment and appeals process will
be initiated during the time of the Planning Commission review. Since development is within
the parameters set forth in the 2004 Comprehensive Plan no additional environmental impact
was found with adoption of the more detailed Plan element and development standards.
Amendments to the Comprehensive Plan and development regulations also require a 60 day
State Agency Review and Comment Period. The document has been forwarded to State
agencies for review.
STAFF RECOMMENDATION
Hold a public hearing on the Non Motorized Transportation Plan, and formulate a recommendation to
City Council for adoption.
OPTIONS
1. Hold a public heaing, consider testimony, and formulate a recommendation to City Council for
adoption of the staff recommended Non Motorized Transportation Plan.
2.
Hold a public hearing, consider testimony, and formulate a recommendation to City Council
for adoption of the staff recommended Non Motorized Transportation Plan with amendments.
3.
Continue the public hearing to a later time to allow additional discussion on the Non-Motorized
Transportation Plan.
2
ATTACHMENTS
Attachment I: Draft Non-Motorized Transportation Plan
(As distributed to the Planning Commission during the 10/23/07 Planning
Commission Meeting.)
3
Commission Meeting Date: November 20, 2007 Agenda Item: V.B.3
CITY OF BREMERTON, WASHINGTON
PLANNING COMMISSION AGENDA ITEM
AGENDA TITLE:
Public Hearing on Revision to Annual Comprehensive Plan
Amendment Docket
DEPARTMENT:
Community Development
PRESENTED BY:
Geoffrey Wentlandt
SUMMARY
th
During the September 18 meeting Planning Commission made a recommendation to
City Council for approval of the 2007 Comprehensive Plan Amendment docket.
Amendment I in the docket concerned land use redesignation of 97.09 acres in the
Werner Rd. corridor. Staff brings a minor modification back to the Planning
Commission on Amendment I in advance of City Council’s action on the docket
scheduled for December, 2007. Please also refer to the Staff Report and associated
materials from the September 18, 2007 meeting for background.
When Planning Commission recommended Amendment I to Council it directed staff to
work with the applicant to fine tune the size and location of a neighborhood business
pocket. While working with the applicant in preparation for further hearings, it became
apparent that while minor, the preferred adjustment was beyond the latitude Planning
Commission had given to staff. Therefore, staff brings forward the adjustment to
Planning Commission for its consideration.
RECOMMENDED MOTION
Move to revise the Planning Commission’s recommend action on the 2007
Attachment I
Comprehensive Plan Amendment Docket as shown in based on the
Attachment II
revised Findings of Fact & Conclusions in .
ANALYSIS
The applicant applied for, and Planning Commission recommended, land use
redesignation from Industrial and City Utility Lands (97 total acres) to primarily Low
Density Residential (LDR +/- 96 acres) with a pocket of Neighborhood Business (NB 1 –
several acres). Both the size and the location of the NB pocket were discussed by
Planning Commission. Questions were 1) whether the NB should be located on Werner
Rd. or integrated within the residential area; and 2) whether adequate NB acreage
should be given so it could grow into a Neighborhood Center over time.
Staff developed a revised recommendation after looking more closely at factors
including: the site plan of the adjacent planned subdivision, the character and traffic
pattern on Werner Rd., and additional input from applicants and neighbors. The bulk of
the proposal remains LDR. The following changes are proposed:
A Neighborhood Business designation of 1.5 acres is integrated within the
residential area rather than on the edge.
An Industrial Park transition area of roughly 7 acres is proposed at the edge of
Werner Rd.
See Attached map.
Resized / Relocated Neighborhood Business
The Neighborhood Business (NB) is located more centrally within the Low Density
Residential area to better serve a future neighborhood. The NB area is 1.5 acres to
allow for an NB pocket that could at some future time transition to Neighborhood Center
(NC). The NB is positioned in an area nearer the geographic center of the development
and along the most major arterial roadway that will connect from Werner Rd. into and
through the proposed development on the adjacent site. The applicant also indicates a
potential area that could transition to Neighborhood Center at a future time in the vicinity
of the NB.
Staff recommends the location and size because it better meets the intent of
Comprehensive Plan goals and policies as follows:
LU1C Focus on central organizing features in planning communities, Centers and
neighborhoods.
LU1L Strategically locate amenities such as parks, sidewalks, community centers, and
gathering places to support residential areas.
LU4A Improve pedestrian access to commercial and community services within Centers
and neighborhoods.
Industrial Park Buffer at Werner Rd.
A revised land use redesignation to Industrial Park (IP) for that portion of the site closest
to Werner Rd is proposed. After further discussing with the applicant, and choosing to
move the Neighborhood Business area within the Low Density Residential, the
recommendation for a transition area of Industrial Park near Werner Rd. was
developed. The proposal is more consistent with the Comprehensive Plan as described
below and has several urban design and land use advantages.
The 7 acre tail of the site connecting to Werner Rd. would be flanked by Industrial on
both sides. A roadway onto Werner Rd. to future development in the LDR area would
be located here, but the 7 acre tail itself may not be appropriate or viable for single
family development. Further, staff received input from property owner Ace Paving,
which is a joint applicant, that it would like the Werner Rd. corridor to continue having a
semi-industrial character and land uses. The Light Industrial designation at Werner Rd.
would create an organization of land uses whereby Werner Rd. would retain an
industrial character. The large LDR neighborhoods would be primarily oriented to the
south and east, and would retain some buffer from Werner via the 7 acre Industrial Park
(IP) designation. With Industrial Park (IP) the land use is more orderly and better meets
the Comprehensive Plan policies and direction as follows:
LU pg. 57. Industrial Park Policy Direction:
Provide for appropriate locations for light industrial uses in a well planned complex.
Industrial Parks should include adequate landscaping, architectural standards, and
other site design consideration to assure compatibility with neighboring uses –
especially residential areas.
LU1J Buffer surrounding communities from regional transportation corridors, allowing
for transitional and sensitive development patterns.
Ensure flexibility and options for buffering.
OPTIONS
1. Recommend the revised 2007 Comprehensive Plan Docket to City Council
for Adoption.
2. Do not revise the 2007 Comprehensive Plan Docket.
3. Formulate another recommendation for Amendment I of the 2007
Comprehensive Plan docket.
ATTACHMENTS
Attachment I
– Proposed Revision to Amendment I of the 2007 Comprehensive Plan
Amendment Docket.
Attachment II
– Revised Planning Commission Findings of Fact & Conclusions for
2007 Comprehensive Plan Amendment Docket.
STAFF RECOMMENDATION
Staff recommends that the Planning Commission review the proposed revision to the
2007 Comprehensive Plan Amendment Docket, conduct a public hearing, consider
public testimony, and recommend adoption of the revised amendment to City Council.