HomeMy WebLinkAbout02/21/2012 PACKET(DRAFT) AGENDA
Regular Meeting - Bremerton Planning Commission
(Subject to PC approval)
February 21, 2012
5:30 P.M.
th
345 – 6Street
Meeting Chamber – First Floor
I. CALL TO ORDER
II. ROLL CALL (quorum present)
III. APPROVAL OF THE AGENDA
IVAPPROVAL OF MINUTES:
January 17, 2012Regular meeting.
o
V. PUBLIC MEETING
A. Call to the Public:
Public comments on any item not on tonight’s agenda
B. Workshop
1.
Shoreline Master Program Update to discuss revisions relating to
definitions, buffers and setbacks, vegetation conservation, and height limits.
VI. BUSINESS MEETING
A. Chair Report:
Chairman Jose
B. Director Report:
Andrea Spencer
C.Old Business:
D.New Business
VII.ADJOURNMENT: The next regular meeting of the Planning Commission is
February 21, 2012
Planning Commission meeting packets are available on-line at
www.ci.bremerton.wa.us
DRAFT
Subject to February 21, 2012 Approval
CITY OF BREMERTON
PLANNING COMMISSION
MINUTES OF REGULAR MEETING
January 17, 2012
CALL TO ORDER:
Commissioner Hoell called the regular meeting of the Bremerton Planning Commission to order at 5:30 p.m.
ROLL CALL
Commissioners PresentStaff Present
Commissioner Jose Andrea Spencer, Director, Department of Community Development
Commissioner Cockburn Nicole Floyd, Current Planner, Department of Community Development
Commissioner Hoell
Commissioner Lambert Others Present
Commissioner Mosiman David Sherrard, Parametrix
Commissioner Tift
Quorum Certified
ELECTION OF OFFICERS
Ms. Spencer
reminded the Commission that their bylaws limit a Commissioner to two consecutive terms as Chair, and
Commissioner Hoell has served two terms.
COMMISSIONER MOSIMAN NOMINATED COMMISSIONER JOSE AS CHAIR OF THE PLANNING
COMMISSION FOR 2012. COMMISSIONER LAMBERT SECONDED THE MOTION. THE NOMINATION
WAS UNANIMOUSLY APPROVED.
CHAIR JOSE NOMINATED COMMISSIONER COCKBURN TO SERVE AS VICE CHAIR OF THE PLANNING
COMMISSION FOR 2012. COMMISSIONER MOSIMAN SECONDED THE NOMINATION. THE
NOMINATION WAS UNANIMOUSLY APPROVED.
APPROVAL OF AGENDA
COMMISSIONER HOELL MOVED TO APPROVE THE REVISED AGENDA AS PRESENTED. VICE CHAIR
COCKBURN SECONDED THE MOTION. THE MOTION CARRIED UNANIMOUSLY.
APPROVAL OF MINUTES
COMMISSIONER HOELL MOVED TO APPROVE THE MINUTES OF NOVEMBER 15, 2011 AS PRESENTED.
COMMISSIONER TIFT SECONDED THE MOTION. THE MOTION CARRIED UNANIMOUSLY.
PUBLIC MEETING
Call to the Public
(public comments on any item not on the agenda)
Chair Jose
asked if there were any comments from citizens. Seeing none, he closed the public portion of the meeting.
Workshop: Shoreline Master Program Update (Restoration Plan and Cumulative Effects Analysis)
Ms. Spencer
introduced David Sherrard, Parametrix, who is part of the consultant team for the Shoreline Master Program
(SMP) update.
Mr. Sherrard
noted that the draft Cumulative Effect Analysis and Restoration Plan are required elements of the SMP and
both are available on the City’s website. He reminded the Commission that the SMP must be revised, if necessary, based on
the findings in the Cumulative Effect Analysis, which evaluates the cumulative impacts of reasonably foreseeable future
development on shoreline ecological functions and other shoreline functions fostered by the policy goals of the Shoreline
Management Act (SMA). To ensure there is no net loss of ecological functions, the City is required to fairly allocate the
burden of addressing identified cumulative impacts among development opportunities. No net loss means that over time, the
existing conditions of shoreline ecological functions should remain the same as when the SMP update is adopted. The
Shoreline Inventory that was completed in 2010 will become the City’s official record of existing conditions.
Commissioner HoellMr. Sherrard
recalled that the public has repeatedly asked for a clear definition for “no net loss.”
Ms. Floyd
said a definition was forwarded to and reviewed by the Department of Ecology (DOE). noted that this topic
st
Mr. Sherrard
meeting. clarified that “no net loss” does not mean
would be discussed in greater detail at the February 21
no loss ever at any point on the shoreline. The system must operate at no net loss, but the City can tolerate ecological
impacts in one location as long as they compensate elsewhere to keep the system functioning at the same level.
Mr. Sherrard
said other shoreline functions that are fostered by the policy goals of the SMA include reserving shoreline
areas for water-dependent and associated water-related uses. The Cumulative Effect Analysis includes an assessment of the
demand for water-dependent uses. The analysis concludes that, with the exception of the Navy shipyard, a high demand for
port or industrial uses in Bremerton is unlikely. However, there is likely to be a substantial demand for recreation and
moorage/boat launch facilities.
Commissioner Tift Mr. Sherrard
asked if boat repair and marina activities are anticipated along the City’s shoreline. said
marinas are included as moorage activities. He also explained that because the size of the Puget Sound fishing fleet has
diminished substantially, there appears to be a surplus of boat repair facilities in the Puget Sound. He summarized that
although a ship repair business would not likely choose to locate in Bremerton, this type of activity could be accommodated
within the area designated as Industrial.Commissioner Tift said he is particularly interested in opportunities for local repair
facilities for pleasure boats.
Mr. Sherrard
Next referred to the draft Restoration Plan, which provides goals and policies for the restoration of the
impaired functions. The SMA requires that the City’s Restoration Plan make use of established policies and consider the
effects of other local, state and federal regulatory or non-regulatory programs, as well as restorative efforts that may flow
from the SMP. He reviewed the policies contained in the draft Restoration Plan, specifically highlighting the following:
Work collaboratively with other jurisdictions and stakeholders in the Water Resource Inventory Area (WRIA) 15 to
implement the Salmon Habitat Protection and Restoration Strategy.
Use the scientific foundation and identification of opportunities and constraints in the SMP
Inventory/Characterization.
Use the list of projects and other actions consistent with the Salmon Habitat Protection and other programs as
sources of potential site-specific projects.
Coordinate land use decisions with the comprehensive list of project actions to implement the most effective
restoration strategy.
Encourage voluntary restoration by homeowners and other shoreline property owners.
DRAFT
Bremerton Planning Commission Minutes
26
January 17, 2012 ~ Page of
Provide for management of City-owned parks and other facilities to accomplish ecological restoration, along with
recreation, flood control and other goals. Restoration may not be appropriate in all situations.
Seek funding from a variety of resources.
Mr. Sherrard
summarized that the City has done remarkably well implementing restoration programs in conjunction with
other agencies and obtaining funding from a wide variety of sources. He noted that a portion of the Sinclair Inlet was the
subject of a restoration program within the last decade, and the City also utilized grant funding for the Gorst Watershed Plan.
This type of coordination is encouraged by the SMA. He provided a graph to illustrate the difference between achieving “no
net loss” and restoration. He explained that it is important to mitigate the adverse impacts of a project to achieve no net loss.
Anything above that is considered restoration.
Commissioner Tift
asked if voluntary restoration opportunities apply primarily to people who own shoreline properties.
Mr. Sherrard
answered that most of the projects identified in the Restoration Plan are funded by the Salmon Recovery
Board. The Navy has also been a consistent source of funding for restoration activities in Kitsap County. Individual
property owners are mentioned throughout the Restoration Plan, but the only thing the SMP requires is that existing single-
family residents implement a 10-foot native vegetation conservation area if they undergo expansion or substantial change.
Commissioner Tift
recalled earlier discussions about activities such as car washing and repair, which seem to be rather
Mr. Sherrard
minor compared to stormwater runoff, etc. said the Restoration Plan does address watershed-wide and
localized issues, but they vary depending on the water body and the number of tributaries and proximity to Puget Sound. He
emphasized the importance of coordinating the City’s Restoration Plan with the efforts of the West Sound Watershed
Council, which is the lead entity for salmon recovery in East WRIA 15 and the official group through which state funding
comes. He noted that the City of Bremerton is a member of this group, as well.
Mr. Sherrard
noted that the scale of the Restoration Plan is larger than the City limits and the Urban Growth Area because
any restoration that takes place within a water body is relevant even if a portion of it is located outside of the City. He
provided a map to illustrate the boundaries of the restoration planning area and reviewed the conclusions of the Cumulative
Effect Analysis as follows:
Only small areas of the Bremerton Shoreline are expected to redevelop over the near future.
The SMP provides development standards for “no net loss” for any development that requires a Shoreline
Substantial Development Permit.
Ecological enhancement and/or public access will be required for any new commercial or industrial non-water
dependent use.
Native vegetation conservation will be required for new lots and development and a minimal buffer will be required
for the expansion or alteration of existing single-family development.
The native vegetation conservation requirements will have limited affect on the ecological process on an individual
basis. However, over the long term, education and public awareness programs in conjunction with regulatory
programs will likely lead to beneficial changes in how land owners maintain shoreline vegetation.
The SMP’s preference for softer stabilization will apply to all new structures and development but will only apply to
existing structures that fail or require major modification. Realistically, this requirement will not result in a
substantial change to the currently armored shorelines, but it will prevent further degradation of relatively unaltered
shorelines.
The SMP includes new regulations for docks, piers and other in-water structures that will be implemented over time
as facilities are repaired and/or replaced.
There will likely be no net loss of ecological functions on Bremerton Shorelines. The SMP policies and regulations
ine, and the Critical Areas Regulations address upstream conditions in
apply to the areas closest to the shorel
watersheds that are not within the jurisdiction of the SMP. In addition, there are numerous restoration activities
taking place on shorelines and in tributary watersheds. All of these will have a beneficial effect on the shoreline,
and will likely result in some improvement over time.
Chair Jose
asked Mr. Sherrard to share more about the methodology that was used to determine what types of uses are likely
Mr. Sherrard
to occur along the City’s shoreline. answered that they reviewed all of the water-dependent uses and assessed
DRAFT
Bremerton Planning Commission Minutes
36
January 17, 2012 ~ Page of
the need for each type of use, where each use is currently located elsewhere in Puget Sound, and the likelihood of the City
having the ability to accommodate each use based on the supply of land and competition. From this analysis, it appears that
moorage and boat launching facilities will be the major demand for water-dependent uses along the Bremerton shoreline.
Chair Jose
recalled that the Commission has received comments from the public that there is no scientific information to
Mr. Sherrard
support the conclusions made in the Cumulative Effect Analysis regarding “no net loss.” pointed out that a
lot of scientific information is referenced in the inventory but was not repeated in the Cumulative Effect Analysis. He
summarized that they know a fair amount and are learning more all the time about what degrades both fresh and marine-
water environments and there is a strong basis in science for most of the mechanisms that are identified in the SMP Update.
Chair Jose
summarized that part of the reason for using language such as “likely” and “probably” is because science is still
developing. He asked if Mr. Sherrard is comfortable saying with a high degree of certainty that the proposed SMP would
Mr. Sherrard
result in no net loss. said the City can be fairly confident that the combination of all of the proposed programs
will result in a positive outcome. However, he acknowledged that the SMP may not reverse the ongoing processes that have
resulted from not having localized, detailed studies.
Mr. Sherrard
referred to Tables 3-1, 3-2 and 3-3, which look at certain functional categories for lakes, streams and marine.
The tables review and briefly summarize the existing condition of each of the approximately 40 reaches that have been
identified. The tables also summarize how the provisions of the SMP and other programs will improve the existing
conditions. He specifically reviewed the following:
Dyes Inlet – Only a portion of Dyes Inlet is located within the City, and restoration plans will focus largely on the
tributary system. A lot of restoration activity is currently taking place at Chico Creek.
Ostrich Bay – The Chico Creek Restoration Program will likely affect fresh water input. Oyster Bay Creek, which
currently has significant problems, provides input in the southerly portion of the bay. The majority of development
that is not part of the Marine Park or Navy is single-family residential, and they do not expect a lot of change. What
little change does occur should improve buffers somewhat. In-water structures will be restricted in the small
Aquatic Conservancy area located in the shallowest delta portion of the bay.
Oyster Bay –There is little freshwater input, and the bay is shallow, productive and very sensitive. There is a small
component of public ownership, and private ownership is primarily single-family residential. There is also a small
commercial area. There will be very few opportunities for public land restoration and/or single-family residential
lot changes, but there will be some opportunity for enhancement if the small commercial area is redeveloped in the
future. The entire bay is designated as Aquatic Conservancy, so in-water structures will be restricted.
Mud Bay – There is no freshwater input except for adjacent lots.The bay is very shallow, productive and sensitive,
and there is no public ownership. Private ownership is single-family. The vegetation is intact over most of the
shoreline, which is unusual for an urbanized area. There will few opportunities for restoration, but in-water
structures would be restricted by the Aquatic Conservancy designation.
Port Washington Narrows/Phinney Bay – Fresh water input comes largely from adjacent single-family residential
lots, but there is a small tributary in the southern portion. The southern portion of the bay is shallow and protected,
with no public ownership and one marina. There is little opportunity for preservation and/or restoration. If the
marina is redeveloped, more light penetration would likely be required. In-water structures would be restricted in
the area designated as Aquatic Conservancy.
rt Washington Narrows/West Side – While there is a large watershed area, it mostly discharges into the
Po
stormwater system. There are two public parks, one marina, a small industrial area, and multi-family development.
Chair Jose
There is currently no water-related industrial activity, and it is not likely this will change in the future.
Mr.
recalled there has been some discussion in recent years about a marine industrial sector at Anderson Cove.
Sherrard
agreed there is potential, but it is a very small area.
Sinclair Inlet/Gorst Creek – Freshwater input comes largely from Gorst Creek. The north shore is almost entirely in
public ownership, and there are areas of public ownership on the south side. In addition, the City owns large
portions of the watershed. Not a lot of ecological value is anticipated from the shipyard, and there will not likely be
significant change along the waterfront. However, there is potential for enhancement of the commercial area along
the Gorst Estuary, which has a split designation of Aquatic Conservancy and Commercial. A portion of the land is
a publicly-owned wildlife area. A major watershed plan is underway for Gorst Creek, which can be depended on
for both preservation and restoration activities.
DRAFT
Bremerton Planning Commission Minutes
46
January 17, 2012 ~ Page of
Port Washington Narrows/East Side – Freshwater input includes several streams. The land is currently developed
with two public parks and variety of private uses. It is likely that Bremerton Gardens will redevelop in the near
future, as well as the commercial area along Campbell and Wheaton Way. While it is not likely that the commercial
development would be water dependent, enhancement would be required. The low-density areas in the north will
likely redevelop when annexed, and improved vegetation buffers would be required. There may also be restoration
opportunities as the existing multi-family residential areas are redeveloped over time.
Point Herron/Port Orchard Bay – There is some freshwater input from several streams. There is high-intensity
development along Shore Drive and some commercial area south of the Manett Bridge that offers very limited
enhancement potential. Preservation and/or enhancement will likely occur when the large lots are redeveloped in a
more urban fashion once annexation occurs. The multi-family residential area will likely redevelop with more
effective buffers, and redevelopment of the commercial areas will likely be non-water oriented with enhancement
requirements.
Kitsap Lake – Except for the wetland area, the lake area is fully developed. There may be some enhancement
opportunities at Kitsap Lake Park and the Navy Park. Some watershed restoration could take place as part of the
salmon recovery effort, but the main portion of the Chico Creek Watershed is likely a better candidate.
Union River and Reservoir/Twin Lakes – These areas are owned and managed by the City as a watershed and are in
pretty good shape. Significant changes are unlikely. Both areas have been designated as Urban Conservancy.
Mr. Sherrard
Again,stated that the Cumulative Effect Analysis indicates that additional net loss of ecological functions on
Bremerton shorelines is unlikely. It is likely that improvement will occur over time as a result of the SMP, Critical Areas
Regulations, and restoration activities. He expressed his belief that salmon recovery and other efforts will result in a lot
more information that can be used when reviewing the SMP again in eight years. He concluded that no changes are needed
to the proposed draft SMP based on the Cumulative Effect Analysis. The proposed SMP will effectively meet the “no net
loss” criteria.
Chair Jose
recognized that the analysis and restoration plans are in draft form, but the language needs a fair amount of work
Mr. Sherrard
to correct typographical errors. agreed.
Commissioner Lambert
said she understands that the information contained in the Cumulative Effect Analysis and
Restoration Plan was used to assess the SMP Update. She asked if the City would continue to consult the two documents as
Mr. Sherrard
land use decisions come up. answered that the Cumulative Effect Analysis is intended to be a check-in
process to indicate whether or not the SMP Update is on the right track. The document will not be updated in future years.
The Restoration Plan is a compendium of programs that are currently underway. Restoration activities will be ongoing and
primarily coordinated by the West Sound Watershed Council, of which the City is a participant. It is probable that the
Restoration Plan will not be an active plan, but other restoration planning programs will continue in the future.
Chair Jose
asked if it would be possible for the Restoration Plan to include the concept of “mitigation banks,” which has
been a successful strategy in other locations throughout the State. This concept offers a way to employ the private sector in
restoration projects and provides an easy source of mitigation for people moving forward with projects. He summarized that
Mr. Sherrard
this approach is a viable option for bringing the public and the private sectors together. agreed it would be
appropriate to mention the concept in the Restoration Plan. He said they did consider the potential for “mitigation banking
sites” within the Urban Growth Area, but no good candidates were identified. However, he acknowledged there may be
opportunities at Gorst Creek and Dyes Inlet.
Vice Chair Cockburn Mr. Sherrard
pointed out some discrepancies in the numbers found in Tables, 3-1, 3-2 and 3-3.
agreed to review and update the tables accordingly.
Jackie Rossworn, Executive Director, Kitsap Alliance of Property Owners,
asked for clarification about the consultant’s
Mr. Sherrard
approach of applying river and stream information to salt water. clarified that an entirely different set of
criteria was used to evaluate marine environments. The processes outlined in Table 3-3 are different than the processes
outlined for streams.
Chair Jose
closed the public portion of the meeting. He thanked Mr. Sherrard for his insightful and detailed work.
DRAFT
Bremerton Planning Commission Minutes
56
January 17, 2012 ~ Page of
BUSINESS MEETING
Chair Report
Commissioner Hoell
thanked the Commissioners for letting her serve as their chair. She said she has enjoyed it.
Director Report
Ms. Spencer
announced that the City Council will conduct a public hearing on the Commission’s recommended zoning code
th
amendments related to opiate substitution facilities on January 18, weather permitting. She recalled the Commission
recommended that opiate substitution treatment facilities could be established anywhere the zoning code allows medical
facilities. They also recommended additional criterion regarding location. While the ordinance was drafted as recommended
by the Commission, the City Council expressed concern about allowing the use in every zone. She said she anticipates an
amending motion by the City Council to prohibit the facilities in neighborhood centers. She noted that a map analysis
eliminated most neighborhood centers as potential sites based on the proposed location criterion.
Ms. Spencer
reviewed the Commission’s upcoming work program. She said it is anticipated the Commission will conduct a
public hearing on the Shoreline Master Program Update and forward a recommendation to the City Council in April. The
Commission will then start working on the SKIA Subarea Plan, and staff is working with a consultant to create draft code
language.
Ms. Spencer
said staff has received a few applications for the vacant Planning Commission position, and interviews will be
conducted within the next few weeks.It is anticipated a new member will be appointed by the next meeting.
Commissioner Hoell
pointed out that the December meeting minutes indicated there would be no Commission meeting in
February. The Commission and staff agreed that there would be a meeting in February.
Old Business
Chair Jose Ms.
recalled that several citizens have raised concerns about Senate Bill 5451 related to non-conformance.
Spencer
advised that the Commission is scheduled to discuss this issue at their March meeting.
New Business
No new business was scheduled on the agenda.
ADJOURNMENT
The meeting was adjourned at 6:43 p.m.
Respectively Submitted by:
______________________________ ______________________________
Andrea L Spencer Greg Jose
AICP, Executive Secretary Chair, Planning Commission
DRAFT
Bremerton Planning Commission Minutes
66
January 17, 2012 ~ Page of
Commission Meeting Date: February 21, 2012 Agenda Item: V.B.1
CITY OF BREMERTON, WASHINGTON
PLANNING COMMISSION AGENDA ITEM
AGENDA TITLE: Workshop to discuss revisions to the Draft SMP
DEPARTMENT:
Community Development
PRESENTED BY:
Nicole Floyd, City Planner
SUMMARY:
This workshop is part of a series of workshops to discuss the Draft Shoreline Master Program
(SMP) update. Each workshop focuses on a different set of topics and or sections of the code.
This workshop will focus on fine tuning code sections previously discussed as follows:
Definitions: Revisions and Additions (Attachment I)
Buffers: wetland buffers, low impact development, buffer averaging, and fences
(Attachment (II)
Vegetation Management Plan Requirements (Attachment (III)
Residential Building Height Limits (Attachment (IV)
Applicable Comment Letters (Attachment V)
While reviewing these attachments please consider the following questions:
1) Does the proposed change make the code clearer?
2) Are these amendments in line with previous guidance given by the Planning Commission?
3) Are there additional points of view related to these topics that need to be addressed?
4) Are you in support of the proposed change(s)?
5) Are there areas where the language should be further modified?
UPCOMING MEETINGS:
March 20, 2012
– Workshop to discuss nonconformities and House Bill 5451.
April 17, 2012
– Public Hearing to review of the entire document.
RECOMMENDATION:
Review the materials, consider testimony, and provide direction to staff so the SMP text in the
attachments can be finalized for public review and a hearing.
1
Attachment I
DEFINITIONS
Staff Commentary on Definitions:
In previous meetings the Planning Commission
recommended adding a few definitions and making minor revisions for clarity. Revisions
such as correcting a typo are not represented in this document as they are not
substantive changes. Substantive changes include the revision of the term photic zone,
and the addition of the terms “Setback”, “Will”, and “No Net Loss”.
The term No Net Loss is an integral theme throughout the SMP but has not been
officially defined by the Department of Ecology or any other City thus far in the state-
wide SMP update process. In order to define it, Staff reviewed recent court cases
dealing with No Net Loss and used language from those cases. The definition is
somewhat lengthy (3 paragraphs). It is lengthy because the code uses the term in a
global sense, referring to the overall goal of the City to achieve No Net Loss, and also in
a specific sense, referring to each property owner’s responsibility to ensure No Net Loss
when developing. The Department of Ecology has reviewed the proposed definition and
is supportive of the addition to our code.
Proposed Code Language:
No Net Loss:
No Net Loss of ecological functions is the maintenance of existing
shoreline ecological processes and functions at the level that existed at the time of
approval of the major update to the Shoreline Master Program in 2012 and reflected in
the shoreline inventory and characterization, or for a development project, the conditions
that existed prior to initiation of use or alterations of the shoreline that result in adverse
impacts on ecological processes and functions.
On a Citywide basis No Net Loss means that the ecological processes and functions are
maintained. Regulations may result in localized cumulative impacts or loss of some
localized ecological processes and functions, as long as the ecological processes and
functions of the system are maintained. Maintenance of ecological processes and
functions may require compensating measures that offset localized degradation.
On a project basis, no net loss means that a permitted use or alteration of a shoreline
will not result in deterioration of the existing condition of shoreline ecological functions.
No net loss is achieved both through avoidance and minimization of adverse impacts as
well as compensation for impacts that cannot be avoided. Compensation may include
on-site or off-site restoration of ecological functions to compensate for localized
degradation.
Photic Zone:
The upper layer of a body of water delineated by the depth to which
enough sunlight can penetrate to permit photosynthesis. area between the OHWM and
approximately -30 feet Mean Lower Low Water (MLLW).
Setback
: For the purposes of this chapter, the setback is the horizontal distance
required between the finished exterior wall of a structure and the buffer line.
Will:
Used to express a command and or an inevitability.
Planning Commission Draft Review 2/21/2012
1
Attachment II
BUFFERS AND SETBACKS
Staff Commentary on Wetland Buffer Language:
Although a rarity for Bremerton,
sometimes wetlands are located within the shoreline jurisdiction and, for this reason they
must be addressed in all Shoreline Master Programs. Typically wetlands are associated
with streams, of which Bremerton has very few. An example of such a wetland is at the
south end of Kitsap Lake adjacent to the Kitsap Lake Park.
The Department of Ecology reviewed our proposed wetland buffers and commented that
they were not in line with their wetland guidance documents and did not address all
types of wetlands that may exist in the shoreline environment. They suggested we
revise our document to match theirs. Staff has revised the code language to match
Ecology’s guidance documents. Interestingly, in many cases Ecology’s preferred buffers
are actually a reduction in width from the initial staff draft. The buffers preferred by
Ecology place more focus on the existing function of the wetland with very large buffers
associated with highly functioning wetlands and smaller buffers associated with impaired
wetlands.
In addition to buffer widths, there are mitigation ratios that the Department of Ecology
recommended revising. A mitigation ratio is applied in the case where a developer
builds over a portion of a wetland and therefore must enhance or replace it elsewhere.
In these situations the replacement ratio is very high. This is partially to discourage
people from building in a wetland but it is also because newly planted areas often are
not as diverse and do not function as well as the original wetland, therefore additional
area is required to achieve no net loss. The mitigation ratios suggested by Ecology are
larger than those originally proposed. Please see page 14 of Attachment I to review the
proposed changes.
Staff Commentary on Low Impact Development Language:
The Department of
Ecology recommends removing the exception listed in the code that allows for Low
Impact Development projects within the required buffer. Ecology expressed concern
because as currently drafted the language could be interpreted to allow a wide variety of
uses that are inappropriate in a buffer. Staff has removed this item from the code.
Staff Commentary on Buffer Averaging Language:
The Planning Commission
requested language for buffer averaging to be added to the code so that a new
residence would not be required to be built significantly further back than nearby
properties. Staff reviewed the existing language in BMC 20.44.020 “Traditional Front
Yard” where averaging is allowed to determine the appropriate front yard setback. Staff
also reviewed other SMP codes that allow for buffer averaging. By combining existing
Bremerton code language with provisions from other jurisdictions SMP’s Staff has
created language that allows for averaging when the following conditions can be met:
60% or more of like structures within 500’ along the shoreline are setback less
than the requirement.
A minimum of 10’ buffer is required and must be vegetated per the vegetation
management plan requirements.
A 5’ setback is required from the buffer.
The requirement for 60% comes directly from the existing Bremerton code and
essentially means that more than half of the surrounding structures exhibit reduced
Planning Commission Draft Review 2/21/2012 1
Attachment II
setbacks. The establishment of 500’ measured from the property line in both directions
is intended to establish a boundary that includes at least both adjacent properties if not a
few others, but it limited to those in the near vicinity of the proposal. The existing
Bremerton code uses the numbered block, however shoreline properties are often not
situated on easily numbered blocks, thus 500’ is used instead.
This provision will often result in a reduced buffer. In some cases, such as on Shore
Drive, it could result in essentially no buffer at all due to the proximity of existing
residences to the shoreline. In order to ensure No Net Loss a minimum buffer must be
established. A 10’ minimum was chosen because it is consistent with the minimum
buffer established throughout the code. It is possible that a larger minimum will be
requested by Ecology in their review process, as they commented that our buffers
seemed small. In addition to the 10’ minimum buffer a 5’ minimum setback is required in
order to ensure a property owner will have access around their house without
encroaching into the buffer.
Staff Commentary on Fence Language:
One of the most common questions about
shorelines is whether a homeowner is allowed to construct a fence in their shoreline
“yard”. It was brought to Staff’s attention that the proposed SMP does not address this
issue. Staff suggests adding a section that allows 6’ tall fences along the side property
lines and within the setback area, but does not allow fences within the buffer (except
along the side property lines).
Proposed Code Language:
(a) Regulations:
(1) Critical areas shall be regulated in accordance with the provisions of BMC
Chapter 20.14, the Critical Area Ordinance, with the modifications and exceptions as
follows:
(i) The provisions of BMC 20.14.145, Exemptions, Subsection (d)
Forest Practices, shall comply with all policies and standards of this Chapter and RCW
90.58.150.
(ii) The provisions of BMC 20.14.155, Reasonable Use Exception,
shall not apply within shoreline jurisdiction.
(iii) The provisions of BMC 20.14.330(f)(1) relating to standard
wetland buffers shall be governed by the following standards within Shoreline
Management Act Jurisdiction:
WetlandStandardModerateModerate-High
Category BufferWildlifeHigh Wildlife Function
WidthFunctionFunction(30-36
(210-258(26-29 or wildlife
Points)morepoints)
points)
Category I: 125 75’ 150 105’ 225 165’ 225’
Based on
Score
Category I: 150’ N/A 165’ 225’
Coastal
Lagoons
Planning Commission Draft Review 2/21/2012 2
Attachment II
Category I: 75’ 105’ 165’ 225’
Forested
Category I: N/A N/A N/A
150’
Estuarine
Category II: All 100 75’ 150 105’ 225 165’ 225’
Category III: All 75 60’ 125 105’ 150 165’ N/A
Category IV: All 50 40’ 5050 N/A N/A
N/A
(iv) The provisions of BMC 20.14.330(g) and 20.14.340(f) relating to
wetland mitigation shall not apply within the shoreline jurisdiction. The following
standards shall apply:
Wetland Mitigation Type and Replacement Ratio*
WetlandCreationRe-establishmentRehabilitationEnhancement
Category Only
Category I 6:1 6:18 12:1 Not allowed
Category II 3:1 3.14 6:1 6 12:1
Category III 2:1 2.13 4:14 8:1
Category IV 1.5:1 1.5:1 2 3:1 3 6:1
* Ratio is the replacement area: impact area.
(v) Within the shoreline jurisdiction, compensation for wetland buffer
impacts shall occur at a minimum 1:1 ratio. Compensatory mitigation for buffer impacts
shall include enhancement of degraded buffers by planting native species, removing
structures and impervious surfaces within buffers.
(vi) The provisions of BMC 20.14.630(c) relating to reduction of
geologic hazard buffers/setbacks shall be processed in accordance with the Conditional
Use permit provisions of BMC 20.16.520. Report(s) must be submitted by a qualified
professional(s) establishing the following:
(a) The modification will not result in foreseeable risk from
geological hazards to people or improvements during the life of the development; and
(b) For marine bluffs, demonstrate that the proposed
development will be set back sufficiently to ensure that shoreline stabilization is unlikely
to be necessary in the future; and
(c) Clear evidence that there is no alternative to modifying the
buffer to accommodate allowed development, including reduction in the size or area of
the development, or relocation on the contiguous site; and
(d) Establish that there is no loss of the ecological functions
provided by buffer vegetation including habitat; and
(e) Document that no net loss of ecological functions will
result.
Planning Commission Draft Review 2/21/2012 3
Attachment II
(vii) The provisions of BMC 20.14.730(d) Buffers and Associated
Building Setback Areas relating to fish and wildlife habitat conservation area shall be
governed by the following standards within shoreline jurisdiction:
Minimum
BuildingBuffer Width
DESIGNATION SetbackStandard
URBAN CONSERVANCY 15 feet175 feet
beyond
buffer
SINGLE FAMILY & MULTI FAMILY RESIDENTIAL
Lot depth less than 125’ 5 feet beyond 20% of lot
bufferdepth
Lot depth 125’ to 199’’ 10 feet 20% of lot
beyonddepth
buffer
Lot depth greater than 200’ 30% of lot
15 feet
depth
beyond
(Maximum of
buffer
100’)
RECREATIONAL 15 feet 100 feet
beyond
buffer
COMMERCIAL / INDUSTRIAL / DOWNTOWN 15 feet 50 feet
WATERFRONTbeyond
buffer
ISOLATED None None
Please note: For all designations, setbacks and buffers listed above the
following shall apply:
(1) Where lot depth is less than 150 feet on Commercial or Recreational lots, the
buffers listed above may be reduced to 20% of the lot depth.
(2) In no case shall a buffer be less than 10’ or greater than 100’.
(3) As noted in the BMC 20.14.700, buffers are measured from the Ordinary High
Water Mark.
(viii) The provisions of BMC 20.14.730(d)(1) Buffers and BMC
20.14.730(d)(5) Buffer Reduction shall not apply within the shoreline jurisdiction.
(ix) The provisions of BMC 20.14.730(d)(6) Stormwater Management
shall apply within shoreline jurisdiction only to buffers of 100 feet or greater width.
(x)The provisions of BMC 20.14.730(d)(7) Low-Impact Development (LID)
Facilities shall apply within the shoreline jurisdiction only to LID facilities involving
minimal grading and removal of vegetation and shall be applied only to the outer fifty
(50) percent of buffers of 100 feet or greater width.
(xi)(x) The provisions of BMC 20.14.730(d)(8) Habitat Conservation Area
Buffers shall not apply within the shoreline jurisdiction.
(xi) The provisions of BMC 20.14.740 relating to Habitat Management
(xii)
Plans may reduce the width of a shoreline buffer to no less than ten twenty five (1025)
feet provided enhancement features are installed that will provide a greater habitat
function than the prescribed buffer would.
Planning Commission Draft Review 2/21/2012 4
Attachment II
(xii) Setback and Buffer Averaging: The Director may grant
modifications to the buffer and setbacks required for existing single family lots under
separate ownership provided:
(a) Sixty (60%) percent or more of like structures along the
shoreline within 500’ on both sides of the subject property are setback less than the
required buffer/setback required by the SMP. The average of the current setback of said
structures may be implemented as a modified buffer for the proposal, provided that;
(i) No new or substantially modified structure may have a buffer of
less than ten feet (10’); and
(ii) The buffer shall be restored with native vegetation as provided
in 20.16.620; and
(iii) In addition to the buffer, a minimum of a five foot (5)’ setback
shall be required for the structure.
(xiii) Fences are prohibited in buffers with the exception that they may
be constructed on side property lines. General development standards for fences BMC
20.44.020 apply.
(2) Exemptions: The following development activities are not subject to
buffers and setbacks, provided they are constructed and maintained in a manner that
minimizes adverse impacts on shoreline ecological functions, and further provided that
they comply with all the applicable regulations in BMC Title 20:
Those portions of approved water-oriented development that require a
(i)
location waterward of the ordinary high water mark, and/or within their associated buffers
and setbacks.
(ii)(i) Underground utilities.
(ii) Modifications to existing development that are necessary to
(iii)
comply with environmental requirements of any agency when otherwise consistent with
this Program, provided that the City determines that:
(a) The facility cannot meet the dimensional standard and
accomplish the purpose for which it is intended; and
(b) The facility is located, designed, and constructed to meet
specified dimensional standards to the maximum extent feasible; and
(c) The modification is in conformance with the provisions for
non-conforming development and uses.
(iv)(iii)Roads, railways, and other essential public facilities that must
cross shorelines and are necessary to access approved water-dependent development
uses are subject to development standards in BMC 20.16.890.
(v)(iv) Stairs, ADA ramps, and walkways not greater than 5 feet in width
or 18 inches in height above grade, not including railings.
(v) Shared moorages shall not be subject to side yard setbacks when
located on or adjacent to a property line shared in common by the project proponents
and where appropriate easements or other legal instruments have been executed
providing for ingress and egress to the facility.
Planning Commission Draft Review 2/21/2012 5
Attachment III
VEGETATION CONSERVATION
Staff Commentary on Vegetation Management Plan Language:
The vegetation
management plan requirements are a new section for Bremerton. The goal is to
minimize the overall size of buffers with the intent that the increased vegetation within
the buffers will provide better overall habitat function than large buffers would. Ecology
has reviewed our proposed buffer widths and vegetation management plan requirements
and has cautioned Staff that substantial rationale is necessary to allow for the proposed
buffers as they are relatively small. Staff has made revisions that emphasize the
achievement of No Net Loss through the vegetation management plan criteria and in the
process has improved flexibility for property owners.
The primary proposed change to this section of the SMP is to combine the commercial
and residential requirements into one section, as they are almost identical. Previously
they were broken into two sections in order to provide more flexibility for residential
structures, however after reviewing other jurisdictions codes, greater flexibility may be
provided without dividing the section into two and it allows us to keep the code more
simple.
The initial draft of the residential section did not specifically require a set number of trees
as is required in the commercial section. Staff intentionally made this distinction due to
the public concern that trees would likely block residential views of the shoreline. In
reviewing other jurisdictions requirements and due to Ecology’s comments Staff
suggests that combining the sections would allow for a more flexibility even though trees
would be required because each plan could be specifically developed on a case by case
basis. The following elements are proposed to improve flexibility:
Eliminate the specific number of trees or shrubs required; and
Allow for natural grouping of trees and shrubs in order to protect existing views.
By adding these two provisions Staff is hopeful that the concerns about views will be
mitigated. Although trees will be required, this will enable professionals to prepare plans
that are more specifically tailored to each site. This also puts more responsibility onto
the person preparing the planting plan to ensure that adequate plantings are installed.
The specific inclusion of trees in the residential area will help emphasize that vegetation
enhancement will offset smaller buffers because trees have been shown to directly
improve habitat function as they provide shade, leaf litter, nutritional sustinance, and
shelter for habitat.
The residential section currently is silent about who must prepare the vegetation
management plan; however the commercial section requires a biologist or other qualified
professional to prepare it. Staff had originally envisioned allowing a single family
residential property owner to draw up their own, but due to the technical nature of the
document and the necessary expertise required it is unlikely the average citizen would
be able to adequately prepare such a plan. Additionally, ensuring a biologist or qualified
professional prepares the report will aid in creating a solid rationale that site specific
ecological conditions are being carefully considered and that the vegetation will in fact
provide better habitat function than larger buffers would.
Additionally Staff proposes modification of the height requirement for trees. The
Department of Ecology points out that younger, smaller trees have a better survival rate
Planning Commission Draft Review 2/21/2012 1
Attachment III
than older trees do and suggest requiring only 25% of the trees to meet a dimensional
standard. Staff has revised the plan accordingly.
Finally, Staff has added clarification as to what projects are exempt from the vegetation
management plan requirements, such as minor additions to nonconforming structures
etc.
Proposed Code Language:
(a) Policies:
(1) The City should protect, conserve and establish native vegetation nears
shorelines in order to protect and restore the ecological functions and ecosystem
wide processes performed within riparian and near shore areas which include but
are not limited to:
Protecting plant and animal species and their habitats;
Providing food sources for aquatic and terrestrial species in the form of
various insects and benthic macro invertebrates;
Providing shade necessary to maintain water temperatures for
salmonids, forage fish, and other aquatic biota;
Protecting and increasing stability of banks and bluffs;
Reducing the hazard of slope failures or accelerated erosion;
Reducing the need for structural shoreline stabilization measures;
Improving the visual and aesthetic qualities of the shoreline;
Protecting and improving water quality through filtration and vegetative
uptake of nutrients and pollutants;
Providing habitat corridors parallel and perpendicular to the water
body.
(b) Regulations:
(1) A Vegetation Management Plan shall be submitted for all new
development andor redevelopment within the shoreline jurisdiction with the
exception of water-dependent uses and single family residential use (for single
family, see (2) below). The plan shall provide for substantial enhancement of
shoreline ecological functions and must provide the maximum ecological
functions feasible, in accordance with the following:
(i) The plan shall preserve, enhance or establish native
vegetation within the entire specified Critical Area buffer. Vegetation
management plans shall be prepared by a qualified professional and shall
describe actions that will be implemented to ensure that buffer areas provide
ecological functions equivalent to a dense native vegetation community to the
maximum extent feasible.
(ii) The Plan must provide for planting of trees, not less than
one (1) per one hundred (100) square feet, shrubs not less than ten (10) per one
hundred (100) square feet, and ground cover to a sufficient density of ground
cover to provide effective coverage for canopy cover and erosion control
purposes throughout the buffer. The Director may allow for a portion of the trees
Planning Commission Draft Review 2/21/2012 2
Attachment III
and shrubs to be placed in natural groups to allow for view preservation and a
shoreline access trail.
(iii) The Plan shall specify the predevelopment quantity, species
type, distribution, approximate height of native vegetation, tree diameter at four
(4) feet in height, succesional stage of overall vegetative cover, potential native
vegetation types, soil type / characteristics, and any existing hazard trees on the
entire site. Said information shall be indicated and represented on a site plan
drawn to scale and shall be reflected on an accompanying species and count
matrix.
(iv) Identification of native vegetation to be removed and
protected as a result of the proposal must be shown on the site plan, as well as
any noxious vegetation onsite.
(v) At least 25% of Aall new trees shall be a minimum height of
four (4) feet. Shrubs shall be of at least four different varieties.
(vi) Methodology for removal of noxious vegetation and long
term maintenance is required.
(vii) A financial surety (an assignment of funds or surety bond
with no expiration date) that accounts for 150% of the cost of a five year
maintenance and monitoring plan that ensures a survival rate of 100% for trees
and 85% for all other vegetation is required. The five year maintenance and
monitoring period and shall begin at the time the required native vegetation has
been installed, and verified by a representative from the Department of
Community Development. Monitoring shall consist of photographs taken by the
applicant yearly to indicate the continued survival of the plants. Said photos shall
be submitted at the end of the 5 years to the Department of Community
Development for release of the financial surety.
(viii) Required vegetation shall be maintained over the life of the
use and/or development. In order to ensure such maintenance a recorded
conservation easement or a Notice to Title shall be placed on the deed of the
property identifying the buffer area and required plantings so that a record of the
plan is available to all future property owners. The Notice to Title shall be
recorded prior to issuance of the permit.
(ix) Repair, maintenance, and Minor projects minor expansions
of existing development may not be required to provide a vegetation
management plan dependent upon the scope of the project. Please review BMC
20.16.660 to review the requirements for expanding a nonconforming
structure.are exempt .as defined in BMC 20.16.XXX and RCW 90.58.
(2)Single Family Vegetation Management Plan: Expansion or alteration of
existing single family residents within the shoreline jurisdiction shall provide a
vegetation management plan outlining the native vegetation community to be
planted within the critical area buffer.The native vegetation shall include the
following:
Planning Commission Draft Review 2/21/2012 3
Attachment III
(i)The plan shall preserve, enhance or establish native vegetation
within the entire specified Critical Area buffer. Vegetation management plans
shall describe actions that shall be implemented to ensure that buffer areas
provide ecological functions equivalent to a dense native vegetation community
to the maximum extent feasible.
(ii)The Plan must provide for planting of shrubs (1 gallon in size) not
less than ten (10) per one hundred (100) square feet, and a sufficient density of
ground cover to provide effective coverage for erosion control purposes
throughout the buffer. The Director may allow for a portion of the shrubs to be
placed in natural groups to allow for a shoreline access trail.
(iii)The Plan shall specify the predevelopment quantity, species
type, distribution, approximate height of native vegetation, tree diameter at breast
height (4 feet), succesional stage of overall vegetative cover, potential native
vegetation types, soil type / characteristics, and any existing hazard trees on the
entire site. Said information shall be indicated and represented on a site plan
drawn to scale and shall be reflected on an accompanying species and count
matrix.
(iv)Identification of native vegetation to be removed and protected
as a result of the proposal must be shown on the site plan, as well as any
noxious vegetation onsite.
(v)Shrubs shall be of at least four different varieties.
(vi)Methodology for removal of any noxious vegetation and long
term maintenance is required.
(vii)Required vegetation shall be maintained over the life of the use
and/or development. In order to ensure such maintenance, a recorded Notice to
Title shall be placed on the deed of the property identifying the buffer area and
required plantings so that a record of the plan is available to all future property
owners. The Notice to Title shall be recorded prior to issuance of the permit.
(viii)Minor projects are exempt as defined in BMC 20.16.XXX or
RCW 90.58.
(3)(2)Removal of or alteration of native vegetation within the shoreline
jurisdiction is strictly prohibited unless such activity is required for a permitted use
or is determined to be hazardous by a qualified professional. Removal of trees
greater than 6 inches in diameter at four (4) feet in height shall be replaced at a
ratio of 3:1 with native species and shall be re-established within any required
buffer on the project site.
(3) In the absence of a development proposal requiring a permit,
existing landscaping and gardens within the buffer may be maintained in their
existing condition including but not limited to, mowing lawns, weeding, removal of
noxious and invasive species, harvesting and replanting of garden crops, pruning
and replacement planting of ornamental vegetation or indigenous native species
to maintain the condition and appearance of such areas as they existed prior to
adoption of this code.
Planning Commission Draft Review 2/21/2012 4
Attachment IV
HEIGHT
Staff Commentary on Commercial and Multi-Family Residential Height Language:
The Multi-family Residential Designation currently has a height limit of 40’ however there
are two areas in town with this designation, one of which does not allow heights over 35’
in the upland zoning. This area is generally north of Manette along Wheaton Way. The
SMP sets a 35’ height limit for commercial and industrial designations that are not in the
Downtown area and allows for taller structures Downtown. For this reason Staff
proposes to create two height limits for the Multi-Family designation which would allow
40’ Downtown and 35’ elsewhere.
Staff Commentary on Single Family Residential Height Language:
Single Family
Residential development along the shoreline currently has a height limit of 25’ with the
caveat that the height can be increased to 35’ provided there is an increase in view
corridor width. Since the updated SMP proposal is to eliminate the view corridor
requirement there has been significant debate about the appropriate height limit and if
any offsetting features should be required. At the October workshop, Planning
Commission directed Staff to look at other jurisdictions, evaluate options, and provide a
proposal.
Staff reviewed 15 other jurisdictions and found the vast majority simply set a 35’ height
limit for residential structures along the shoreline. Kitsap County and Poulsbo are
included in the list of jurisdictions allowing 35’. Port Orchard sets the limit at 33’ and
Bainbridge Island sets it at 30’. In fact, the only other jurisdiction Staff could find with a
height limit of 25’ was Edmonds, which did so not because of shoreline concerns, but to
match the upland zoning height limit. Based only on other jurisdictions, it appears that
30’ – 35’ is appropriate.
The primary concern regarding height is the blockage of views from upland properties.
View blockage is increased by the manner in which Bremerton measures height
because it encourages flat roofs that tend to more fully block views. Pitched roofs, on
the other hand, allow for views on both sides of the peak. Since height is measured to
the peak of the structure, rather than to the midpoint of the roof, a flat roof can provide
more interior square footage within the same building footprint. Many developers have
commented in the past that 25’ is very restrictive and simply adding a few additional feet
in height would allow for substantially more flexibility for them to construct attractive and
marketable home designs.
In order to provide better flexibility and maintain views, Staff suggests setting a height
limit of 30’ with provisions that allow heights up to 35’ with a pitched roof. This way
Bremerton’s code would be within the same range as other jurisdictions and it would
encourage a construction type that would allow better upland views than are offered in
other similar jurisdictions.
The following pictures help to illustrate the view blocking potential of three different
homes that are all approximately 25’ tall but have varying roof pitches.
Planning Commission Draft Review 2/21/2012 1
Attachment IV
Pitched roof is parallel to the Shallow pitched roof, Steep pitched roof, allows
shoreline, providing similar view providing some for views, but limits the size
blockage as a flat roof.additional views. of the second floor.
The proposed language states that a pitched roof must be perpendicular to the shoreline
and must have a pitch of at least 6:12. The following diagram helps illustrate the variety
of roof pitch (the proposed pitch is represented as 12/6 in this chart):
Planning Commission Draft Review 2/21/2012 2
Attachment IV
As noted in the chart, a 6:12 pitch is not the steepest possible, rather it is just steep
enough to allow for views on both sides of the roof while maintaining maximum flexibility
and choice. Typically the steeper the pitch of the roof, the more expensive the roof is.
Additionally, on wider structures the increased roof pitch may decrease the overall area
of the top story. An applicant would need to evaluate the costs and benefits associated
to building over 30’ tall and determine that the potential increase in cost and potential
impacts to interior space would be worth the additional height.
Proposed Code Language:
This table establishes the allowable height in each designation based on the type of use.
All the applicable City standards still apply. In the event the provisions of this Program
conflict with provisions of other regulations, the more restrictive shall prevail. Height
measurement is defined in BMC 20.16.300.
Table 20.16.790(b)
ENVIRONMENT DESIGNATION HEIGHT
Commercial
35 feet
45 -175
Downtown Waterfront feet
Downtown Multi Family Residential 40 feet
Industrial 35 feet
Multi Family Residential
35 feet
Over-Water Structures (All
Designations) 15 feet
Recreation 35 feet
30 feet
1
Single Family Residential
Urban Conservancy 25 feet
1
Single Family Residential height may be increased to 35’ with the employment of a pitched roof when:
(a) The pitch of the roof is not less than 6:12
(b) The pitched roof is oriented perpendicular to the shoreline (Gables or other roof features parallel to the
shoreline are permitted)
(c) The pitched roof covers the entire structure
Planning Commission Draft Review 2/21/2012 3
Attachment V
APPLICABLE PUBLIC COMMENTS
The following comment letters are applicable to the topics to be discussed at this
workshop and are therefore included in your packet. This is not an exhaustive list of all
comments received over the last several years relating to the SMP; rather it includes only
those letters that are applicable to specific topics addressed in this workshop:
1.Department of Ecology – Please be advised that this comment letter is
comprehensive and addresses a wide variety of topics, of which several are
directly related to the topics of this workshop. Some topics however are outside
the purview of this workshop. Staff has only addressed those portions of the letter
that are directly applicable.
2.Dana Hamar – This comment generally relates to the height limits. Specific
questions asked in the letter have been answered.
Planning Commission Draft Review 2/21/2012