HomeMy WebLinkAbout5099 Contract Number 5099
Vendor WESTMARK CONSTRUCTION, INC.
Subject Biosolids Storage Relocation -- Roof Const.
Department. Forestry
File Class LEG 12 -1
Begin Date. 11/28/2011
End Date 2/29/2012
Review Date
Vault Date: 2014
Comments Complete 75 days after NTP, Contract Closed 5/8/12
NOC 2/28/12
AFFIDAVIT OF PUBLICATION
Account #42742 AD #280618
STATE OF WASHINGTON
COUNTY OF KITSAP
I, Jessica Zuehl - Miller, being first duly sworn on oath, deposes and says That she is now, and at all tunes
embraced in the publication herem mentioned was the principal clerk of the printers and publishers of
KITSAP SUN, that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said tune, was printed in an office maintained in the aforesaid
place of publication of said newspaper, that the following is a true text of an advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following date, to wit
And on February 23, 2012 such newspaper was regularly distributed to its subscribers during all of said
period The full amount of the fee charged for the foregoing publication is the sum of $39 00 This amount
has not been paid in full
(Signature of Principal Clerk)
Subscribed and sworn to before me this day of February 28, 2012
Notary Public in and for the State of Washington, Kitsap County CASSANDRA A CAPAS
Notary Public
State of Was
My Commission Expire'
February 04, 2-014
NOTICE OF COMPLETION
Notice of Completion has been issued to Westmark Construction, Inc , Capital Project 5342 (WCI Job #11-
0095), for the Biosohds Storage Relocation - Roof Construction, at Biosohds Application Site #1 Any
parties having a claim for material, labor or damages related to this Contract have forty five (45) days from
the date of first publication of this notice to file a claim
Shannon Corm
Interim City Clerk
345 6th Street, Suite 600
Bremerton, Washington 98337
February 23, 2012
AD #20122424
Washington State
Department of Revenue
6 �` enu PO Box 47474
Olympia, WA 98504 -7474
600 040 824
Certificate of Payment of State Excise
Taxes by Public Works Contractor
WESTMARK CONSTRUCTION INC CITY OF BREMERTON PUBLIC WORKS & UTIL
6102 N 9TH ST STE 400 BILL MCKINNEY
TACOMA WA 98406 2097 100 OYSTER BAY AVE N
BREMERTON WA 98312
We hereby certify that taxes, increases and penalties due or to become due from the above -named
contractor under Chapter 180, Laws of 1935, as amended, with respect to the following public works
contract
CITY OF BREMERTON PUBLIC WORKS & UTIL
5342, BIOSOLIDS STORAGE RELOCAT - ROOF CONSTR
together with all other taxes, increases and penalties due from such contractor, have been paid in full or that
they are, in the Department's opinion, readily collectible without recourse to the state's lien on the retained
percentage
This certificate is issued pursuant to the provision of Chapter 60 28 Revised Code of Washington for the
sole purpose of informing the state, county, or municipal officer charged with the duty of disbursing or
authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases
the state's lien on the retained percentage provided by this Chapter for excise taxes due from said contractor.
This certificate does not release said contractor from liability for additional tax that may be later
determined to be due with respect to the above - mentioned contract or other activities
Dated AYM -2- V at Olympia, Washington,
State of Washington
Department of Revenue
d A.
Certlfyl fficer
For tax assistance, visit dor wa gov or call 1- 800 - 647 -7706 To inquire about the availability of this document in an alternate format for the visually impaired ,
please call (360) 705 -6715 Teletype (TTY) users may call 1- 800 -451 -7985
REV 310028 (10- 01 -02)
STATf
o �
Y
STATE OF WASHINGTON
DEPARTMENT OF LABOR AND INDUSTRIES
CITY OF BREMERTON PUBLIC WORKS & UTIL
ATTN: BILL MCKINNEY, PROJECT MANAGER
ENGINEERING DIVISION
100 OYSTER BAY AVE N
BREMERTON WA 98312
Certificate of Release of the State's Lien on Public Works Contracts
With this letter, the Washington State Department of Labor & Industries
approves of your release or payment of the contract amount retained
from the following contractor - --
WESTMARK CONSTRUCTION INC 333,439 -00 600 040 824
6102 N 9TH STREET STE 400
TACOMA WA 98406 -2097
- -- related to the following public works contract:
BIOSOLIDS STORAGE RELOCATION -ROOF CONSTRUCTION
5342
This approval is for workers' compensation insurance premiums only.
L &I's prevailing wage section separately requires all contractors on the
project file an affidavit of wages paid. These affidavits must be
approved before retainage can be released.
In our opinion, all workers' compensation insurance premiums, increases,
and penalties due to L &I from this contractor have been paid in full or
are readily collectible without recourse to the state's lien on the
retained percentage. **
This letter's sole purpose is to communicate our release of the state's
lien to the public official responsible for paying or authorizing the- -
payment of public funds to the contractor named above.
If we later determine that the contractor owes additional premiums
related to the above - mentioned contract or other activities, the
contractor is still liable for payment.
Dated June 6, 2012 at Olympia, Washington.
Co ram' 9R lie }� alist
JOLENE SKINNER
360 - 902 -4859 or SKIK235@LNI.WA.GOV
** Title 51 RCW authorizes L &I to collect workers' compensation
insurance premiums, increases, and penalties.
Chapter 60.28 RCW establishes L &I's priority regarding this lien.
Chapter 39.12 RCW addresses L &I's requirement for affidavits of
wages paid.
. Employment Seculrity Department
#1F WASHINGTON STATE
P O Box 9046 Olympia, WA 98507 -9046 1 Fax 360 - 902 -9287
CERTIFICATE OF
CITY OF BREMERTON PUBLIC WORKS & ) PAYMENT OF CONTRIBUTIONS
UTILITIES ) PENALTIES AND INTEREST ON
Attn BILL MCKINNEY ) PUBLIC WORKS CONTRACT
100 OYSTER BAY AVE N ES Reference # 36892700 4
BREMERTON, WA 98312 UBI No 600040824
CONTRACTOR
WESTMARK CONSTRUCTION
6102 N 9TH ST SUITE 400
TACOMA, WA 98406 -2097
The Employment Security Department hereby certifies those contributions, penalties and interest
due from the above named contractor under the Employment Security Act have been paid in full or
provided for with respect to the following public works contract
Description BIOSOLIDS STORAGE RELOCATION - ROOF CONSTRUCTION
Contract number 5342
The Employment Security Department hereby certifies that it has no claim pursuant to RCW
50 24 130 against the public body named above for tax attributable to service performed for said
public body by the above named contractor on the above described contract The Employment
Security Department releases its lien on the retained percentage which is provided by RCW
60 28 040 for contributions, penalties and interest due from said contractor
This certificate does not release said contractor from liability for additional contributions, penalties
and interest which may be later determined to be due with respect to the above mentioned contract
Dated at Olympia, Washington on May 8, 2012
EMPLOYMENT SECURITY DEPARTMENT
By
Robyn R Wells
Authorized Representative
Original - Disbursing Officer
Duplicate - Employer
Triplicate - Central Office Files
Contract Number: 5099
Vendor: Westmark Construction, Inc.
Subject: Biosolids Storage Relocation -- Roof Const.
Department: Forestry
File Class: LEG 12 -1
Begin Date: 11/28/2011
End Date: 2/29/2012
Review Date:
Vault Date: 2014
Comments: Complete 75 days after NTP
NOC 2/28/12
AFFIDAVIT OF PUBLICATION
Account #42742 AD #280618
STATE OF WASHINGTON
COUNTY OF KITSAP
I, Jessica Zuehl - Miller, being first duly sworn on oath, deposes and says That she is now, and at all tunes
embraced in the publication herem mentioned was the principal clerk of the printers and publishers of
KITSAP SUN, that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an office maintained in the aforesaid
place of publication of said newspaper, that the following is a true text of an advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following date, to wit
And on February 23, 2012 such newspaper was regularly distributed to its subscribers during all of said
period The full amount of the fee charged for the foregoing publication is the sum of $39 00 This amount
has not been paid in full
6
I %"b
(Signature of Principal Clerk)
Subscribed and sworn to before me this day of February 28, 2012
CASSANDRA A CAPAS
Notary Public in and for the State of Washington, Kitsap County Notary Public
State of Washington res
My Commission Expires
February 04, 2014
NOTICE OF COMPLETION
Notice of Completion has been issued to Westmark Construction, Inc , Capital Project 5342 (WCI Job #11-
0095), for the Biosolids Storage Relocation -Roof Construction, at Biosolids Application Site #1 Any
parties having a claim for material, labor or damages related to this Contract have forty five (45) days from
the date of first publication of this notice to file a claim
Shannon Corm
Interim City Clerk
345 6th Street, Suite 600
Bremerton, Washington 98337
February 23, 2012
AD #20122424
Contract Dlumber:
Vendor:
Sub�ect:
Department:
File Class:
Begin Date:
End Date:
Review Date:
Vault Date:
Comments :
5099
Westmark Construction, Inc.
Biosolids Storage Relocation -- Roof Const.
Forestry
LEG 12-1
11/28/2011
2/29/2012
2/29/2014
Complete 75 days after NTP
�
�,.
`� �� PUBLIC WORKS AGREEMENT
Biosolids Storage Relocation — Roof Construction
(Capital Project 5342)
THIS AGREEMENT, is entered mto between the Crty of Bremerton, a Washington
Mumcipal Corporation ("City"), and Westmark Construction, Inc ("Contractor"), whose mailmg
address is 6102 North 9 Street, Surte 400, Tacoma, WA 98406
The parties agree as follows
1. CONTRACTOR SERVICES. The Contractor shall perform the followmg services
for the Crty
For two Biosolids Storage Facilrties, hereby referred to as "Facilrty #1" and "Facilrty #2",
the followmg work is to be completed
• Procure matenals and provide all labor and equipment to construct two (2) roof
structures per approved plans and calculations dated June 26, 2011, attached to, and
made part of this agreement
• Pnonties for construction and completion shall be 1) Facility #1, 2) Facility #2
• Buildmg permrts have been obtamed from the City of Bremerton The Contractor shall
be responsible for scheduling mspechons by the Crty of Bremerton Department of
Commumty Development
2. TIME OF COMPLETION. Contractor shall complete the work withm forty-five
(45) calendar days for Facility #1 and seventy-five (75) calendar days for Facility #2, from the date
of issuance of the City's Notice to Proceed
3. COMPENSATION. The City shall pay the Contractor the total amount of
$73,829 00, plus any applicable Washington State Sales Tax, for the work and services
contemplated m this agreement The Contractar shall invoice the Crty monthly The Crty will pay
for the portion of the work descnbed m the mvoice that has been completed by the Contractor and �
approved by the Crty The City payment shall not constitute a warver of the Crty's nght to final
inspection and acceptance of the pro�ect
A Performance Bond Pursuant to Chapter 39 08 RCW, the Contractor, shall
provide the City a performance bond for the full contract amount to be in
effect until sixty (60) days after the date of final acceptance, or until receipt
of all necessary releases from the State Department of Revenue and the State
Department of Labor and Industnes and until settlement of any liens filed
under Chapter 60 28 RCW, whichever is later
B Retama�e The Crty shall hold back a retainage m the amount of five percent
(5%) of any and all payments made to contractor for a period of sixty (60)
days after the date of final acceptance, or until receipt of all necessary
releases from the State Department of Revenue and the State Department of
Labor & Industries and until settlement of any liens filed under Chapter 60 28
RCW, whichever is later
Publtc Works AgreemendB�osoltds Storage Relocation 1 11/3/2011
Roof Constructton
, -,
C Defective or Unauthorized Work The City reserves its nght to witfihold �
payment from Contractor for any defective or unauthonzed work Defective
or unauthorized work includes, without limitation work and matenals that
do not conform to the requirements of this agreement, and extra work and
matenals furnished wrthout the City's written approval If Contractor is
unable, for any reason, to satisfactonly complete any portion of the work, the
City may complete the work by contract or otherwise, and Contractor shall be
liable to the Crty for any addrtional costs incurred by the Crty "Addrtional
costs" shall mean all reasonable costs, mcludmg legal costs and attorney fees,
incurred by the Crty beyond the maximum Contract pnce specified above
The Crty further reserves rts right to deduct the cost to complete the Contract
work, mcludmg any Additional Costs, from any and all amounts due or to
become due the Contractor
D Final Pavment Waiver of Claims THE ACCEPTANCE OF FINAL
PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL
CONSTITUTE A WAIVER OF CLAIMS, EXCEPT THOSE PREVIOUSLY
AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS
UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS
MADE
4. INDEPENDENT CONTRACTOIt. Contractor is and shall be at all times acting as
an independent contractor and not as an employee of the Crty The Contractor shall secure at its
expense, and shall be responsible for all payments of income tax, social security, state industrial
msurance compensation, unemployment compensation, and all other payroll deductions for the
Contractor, officer, agents, employees and sub-contractors The Contractor shall also secure all
applicable busmess licenses, if required, in connection with the contract services, including all
required licenses for Contractor's officers, agents, employees and sub-contractors
5. TERMINATION. The Crty may termmate this agreement wrthout nohce for good
cause "Good cause" shall mclude, without limitation, any one or more of the following events
A The Contractor's failure to supply sufficient skilled workers or suitable
matenals or equipment
B The Contractor's failure to prosecute the work with such diligence as will
ensure rts physical completion wrthm the original physical completion time
specified m this Agreement and any extensions of time which may have been
granted to the Contractor by change order or otherwise
C The Contractor's failure to make full and prompt payment to subcontractors
or for matenal or labor
D The Contractor's disregard of federal, state or local laws, rules or regulations
E The Contractor's tiling for bankruptcy or becoming ad�udged bankrupt
F The Contractor disregards the authority of the City
G The Contractor performs work which deviates from the Contract, and
neglects or refuses to correct re�ected work
Public Works AgreemendBiosolids Storage Relocat�on 2 1 I/3/2011
Roof Construction
�� , �
H The Contractor's failure to provide contmuous competent supervision
I The Contractor otherwise violates in any material way any provisions or
requirements of the contract
If the City termmates this agreement for good cause, the Contractor shall not receive any
momes due under this agreement, if any, until the Contract work is completed
6. PREVAILING WAGES. Contractor shall file a"Statement of Intent to Pay
Prevailmg Wages," with the State of Washington Department of Labor & Industries pnor to
commencmg the Contract work Contractor shall pay prevailing wages and comply with Chapter
39 12 of the Revised Code of Washmgton, as well as any other applicable prevailing wage rate
provisions The latest prevailmg wage rate revision issued by the Department of Labor and
Industries is attached
7. CHANGES. The Crty may issue a written or oral work change directive for any
change m the Contract work during the performance of tlus agreement If the Contractor
determmes, for any reason, that a change order is necessary, Contractor must submit a written
change order request to the City's pro�ect manager withm two (2) busmess days of the date the
Contractor knew or should have known of the facts and events giving nse to the requested change
If the Crty determines that the change mcreases or decreases the Contractor's costs or time for
performance, the City will make an equitable ad�ustment The Crty will attempt, in good faith, to
reach agreement with the Contractor on all equitable ad�ustments However, if the parties are
unable to agree, the City will determme the equitable ad�ustment as it deems appropriate The
Contractor shall proceed with the change order work upon receivmg either a wntten or oral work
change directive from the City or a change order from the City If the Contractor fails to require a
change order wrthin the time allowed, the Contractor warves rts right to make any claim or submrt
subsequent change order requests for that portion of the contract work If the Contractor disagrees
with the equitable ad�ustment the Contractor must complete the change order work, however, the
Contractor may elect to protest the ad�ustment as provided below
A Procedure and Protest bv the Contractor If the Contractor disagrees with
anythmg required by a wntten work change directive, oral work change
directive or change order, mcludmg any direction, mstruction, mterpretation,
or determmation by the Crty, the Contractor shall
Give a signed wntten notice of protest to the City withm one busmess
day,
2 Supplement the written protest within five (5) calendar days with a
written statement that provides the followmg mformation
a The date of the Contract's protest
b The nature and circumstances that caused the protest
c The provisions m this agreement that support the protest
d The estimated dollar cost, if any, of the protested work and
how that estimate was determined
e An analysis of the progress schedule showmg the schedule
change or disruption if the Contractar is asserting a schedule
change or disruption
Publ�c Works Agreement/B�osolids Storage Relocation 3 1 l/3/2011
Roof Construct�on
.`
The Contractor shall keep complete records of extra costs and time
incurred as a result of the protested work The City shall have access
to any of the Contractor's records needed for evaluatmg the protest
The City will evaluate all protests, provided the procedures in this
section are followed if the City determines that a protest is valid, the
City will ad�ust payment for work or time by an equitable ad�ustment
No ad�ustment will be made for an mvalid protest
B Contractor's Dutv to Complete Protested Work In spite of any protest, the
Contractor shall proceed promptly with the work as the City has ordered
C Contractor's Acceptance of Changes The Contractor accepts all
requirements of a change order by (1) endorsmg it, (2) wntmg a separate
acceptance, or (3) not protestmg m the way this section provides A change
order that is accepted by Contractor as provided m this section shall
constitute full payment and final settlement of all claims for contract time and
for direct, mdirect and consequenhal costs, mcludmg costs of delays related
to any work, either covered or affected by the change
D Failure to Protest Constrtutes Warver By not protesting as this sechon
provides, the Contractor also waives any additional entitlement and accepts
from the City any wntten or oral order (mcludmg directions, mstructions,
mterpretations, and determmation)
E Failure to Follow Procedures Constrtutes Waiver By failing to follow the
procedures of this section, the Contractor completely waives any claims for
protested work and accepts form the Crty any wntten or oral order (mcluding
directions, mstructions, interpretations, and determination)
8. CLAIMS. The Contractor shall give written notice to the City of all claims other
than change orders wrthm fourteen (14) calendar days of the occurrence of the events giving rise to
the claims Any claim for damages, additional payment for any reason, or extension of time,
whether under this agreement or otherwise, shall be conclusively deemed to have been waived by
the Contractor unless a timely written claim is made in stnct accordance with the applicable
provisions of this agreement, or, if (and only i� no such provision is applicable, unless that claim is
set forth m detail in writmg and received by the Crty wrthm seven (7) calendar days from the date
Contractor knew, or should have known, of the facts givmg rise to the claim. At a mmimum, a
Contractor's written claim must include the information set forth regardmg protests in Section
7A2a-e
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM
WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS
ARISING 1N ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM
OR CAUSED BY THAT DELAY
Contractor must, in any event, file any claim or bnng any suit arising from or connected
wrth this agreement wrthm 120 calendar days from the date the contract work is complete
Public Works AgreemendB�osol�ds Storage Relocat�on 4 I 1/3/201 1
Roof Construct�on
.- ,
f ' 9. WARRANTY. The Contractor shall correct all defects in workmanship and
materials withm one year from the date of the Contractor's acceptance of the City's final payment
under this contract When defects are corrected, the warranty for that portion of the work shall
extend for one year form the date such correction is completed and accepted by the City The
Contractor shall begm to correct any defects withm seven (7) calendar days of its receipt of notice
from the City of the defect If the Contractor does not accomplish the corrections withm a
reasonable time, the City may complete the corrections and the Contractor shall pay all costs
mcurred by the Crty m order to accomplish the correction
10. INDEMNIFICATION. Contractor shall defend, mdemmfy and hold the Crty, its
officers, officials, employees, agents and volunteers harmless from any and all claims, m�uries,
damages, losses or suits mcludmg all legal costs and attorney fees, ansing out of or m connection
with the performance of this agreement, except for in�uries and damages solely caused by the City's
negligence
The City's mspection or acceptance of any of Contractor's work when completed shall not
be grounds to avoid any of these covenants of mdemnification
Should a court of competent �unsdiction determine that this agreement is sub�ect to RCW
4 24 115, then, in the event of liability for damages ansing out of bodily in�ury to persons or
damages to property caused by or resultmg from the concurrent negligence of the Contractor and
the City, its officials, employees, agents and volunteers, the Contractor's liability hereunder shall be
only to the extent of the Contractor's negligence
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS
INDEMNIFICATION CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY
UNDER 1NDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF THIS
INDEMNIFICATION THE PARTIES ACKNOWLEDGE THAT THEY HAVE MUTUALLY
NEGOTIATED THIS WAIVER
The provisions of this section shall survive the expiration or termmation of this agreement
11. INSURANCE. The Contractor shall procure and mamtain for the duration of this
agreement, msurance against claims for inJunes to persons or damage to property that may anse
from or m connection with the performance of the Contract work by the Contractor, its agents,
representatives, employees or subcontractors
Before begmnmg the work on the pro�ect descnbed m this agreement, the Contractor shall
provide a Certificate of Insurance evidencmg
A Automobile Liability msurance wrth limits no less than $1,000,000 combined
smgle limit per accident for bodily inJury and property damage, and
B Commercial General Liability insurance written on an occurrence basis with
limrts no less than $2,000,000 combined single limrt per occurrence and
$2,000,000 aggregate for personal m�ury, bodily m�ury and property damage
Coverage shall include but not be limited to blanket contractual,
products/completed operations/broad form property damage; explosion, collapse
and underground (XCU) if applicable, and employer's liability
Public Works Agreement/B�osol�ds Storage Relocahon 5 11/3/2011
Roof Construct�on
- s ,
Any payment of deductible or self insured retention shall be the sole responsibility of the �`
Contractor
The City reserves the nght to receive a certified copy of all the required insurance policies
The City, its officials, employees, agents and volunteers shall be named as an additional
msured on the insurance policy, as respects work performed by or on behalf of the Contractor and a
copy of the endorsement nammg the City as additional insured shall be attached to the Certificate of
Insurance
The Contractor's insurance shall contam a clause statmg that coverage shall apply
separately to each msured agamst whom claim is made or suit is brought, except with respects to the
limrts of the msurer's liabilrty
The Contractor's insurance shall be pnmary msurance as respects the City, and the City
shall be given thirty (30) calendar days prior written notice by certified mail, return receipt
requested, of any cancellation, suspension or material change m coverage
If this contract requires work to be performed m or on navigable waters, the Contractor
shall provide msurance wrrtten on an occurrence basis wrth limrts no less than $2,000,000 combmed
single limit per occurrence and $2,000,000 aggregate for claims made under the Longshoreman and
Harbor Workers Act and the Jones Act
12. MISCELLANEOUS.
A Nondiscnmmation In the hinng of employees for the performance of work
under this Agreement or any sub-contract hereunder, the Contractor, its sub-
contractors, or any person actmg on behalf of such Contractor or sub-
contractor shall not, by reason of race, religion, color, sex, national ongin, or
the presence of any sensory, mental, physical disability, or sexual onentation
discriminate agamst any person who is qualified and available to perform the
work to which the employment relates
B Compliance with Laws Contractor shall comply with all federal, state and
local laws, rules and regulations throughout every aspect in the performance
of this agreement
C Work Performed at Contractor's Risk Contractor shall take all precautions
necessary and shall be responsible for the safety of its employees, agents, and
subcontractors in the performance of this agreement All work shall be done
at Contractor's own risk, and Contractor shall be responsible for any loss of
or damage to materials, tools, or other articles used or held for use in
connection with the work
D Nonwaiver of Breach The failure of the City to insist upon strict
performance of any of the terms and nghts contamed herein, or to exercise
any option herem conferred m one or more instances, shall not be constructed
to be a waiver or relmquishment of those terms and rights and they shall
remain m full force and effect
Public Works Agreement/Biosohds Storage Relocat�on 6 1 1/3/201 1
Roof Construct�on
1
+ l '
E Governm� This agreement shall be governed and construed in
accordance with the laws of the State of Washmgton If any dispute anses
between the Crty and Contractor under any of the provisions of this
agreement, resolution of that dispute shall be available only through the
�unsdiction, venue and rules of the Kitsap County Supenor Court, Kitsap
County, Washmgton
F Attorne� s Fees To the extent not inconsistent with RCW 39 04 240, m any
claim or lawsuit for damages ansmg from the parties' performance of this
agreement, each party shall be responsible for payment of rts own legal costs
and attorney's fees mcurred in defending or brmgmg such claim or lawsuit,
however, nothmg m this subsechon shall limit the City's nght to
mdemmfication under Section 10 of this agreement
G Written Notice All commumcations regarding this agreement shall be sent
to the parties at the addresses listed on the signature page of this agreement,
unless otherwise notified Any written notice shall become effective upon
delivery, but in any event three (3) calendar days after the date of mailmg by
registered or certified mail, and shall be deemed sufficiently given if sent to
the addressee at the address stated on this agreement
H Assignment Any assignment of this agreement by the Contractor wrthout
the written consent of the City shall be void
Modification No waiver, alteration, or modification of any of the provisions
of this agreement shall be bmding unless in writmg and signed by a duly
authorized representative of the Crty and Contractor
J Severability If any one or more sections, sub-sections, or sentences of this
agreement are held to be unconstitutional or mvalid, that decision shall not
affect the validity of the remainmg portion of tlus agreement and the
remainder shall remam in full force and effect
K Entire A�reement The written provisions and terms of this agreement,
together with any attached Exhibits, supersede all prior verbal statements by
any representative of the City, and those statements shall not be construed as
forming a part of or altenng m any manner this agreement This agreement
and any attached Exhibits contain the entire agreement between the parties
Should any language m any Exhibrt to this agreement conflict with any
language contamed m this agreement, the terms of this agreement shall
prevail
IN WITNESS WHEREOF, the parties below have executed this agreement
THE CITY OF BREMERTON
Publ�c Works Agreement/Biosol�ds Storage Relocat�on 7
Roof Construct�on
�
Print N e Patt,y Lent
Title Ma or
DATE � �g �/
11 /3/20l 1
DATE 1/ ��/l�
���
Notices to be sent to:
CONTRACTOR
Bernd Dreyer
Pro�ect Manager
Westmark, Construction, Inc
6102 North 9 Street, Siute 400
Tacoma, WA 98406
(253)564-4620
Public Works Agreement/B�osolids Storage Relocatton 8
Roof Construct�on
Notices to be sent to:
CITY OF BREMERTON
Bill McKinney
Forestry/Natural Resources Manager
Bremerton Public Works & Utilrties
100 Oyster Bay Ave N
Bremerton, WA 98312
(360) 473-5354
APPR VED AS TO FORM
e n City Attorney
EST ,
Bremerton City erk
11 /3/2011
,
� ACORU� DATE (MMIDD/YYYY)
`� CERTIFICATE OF LIABILITY INSURANCE 11���2011
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER
IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed if SUBROGATION IS WAIVED, sub�ect to
the terms and conditions of the pol�cy, certain polic�es may require an endorsement A statement on this cerGficate does not confer nghts to the
certificate holder in lieu of such endorsement(s)
PRODUCER CONTACT L V8I3 V@EII
Hentschell & Associates, Inc
One Pacific Building
621 Pacific Ave , Suite 400
Tacoma WA 98402
INSURED
Westmark Construction Inc
6102 N 9th St, Suite 400
Tacoma
WA 98406
� (253)272-1151
loriev@hentschell com
lER(S) AFFORDING COVERAGE
Nata.onal Insurance Co
a
D
(253)272-1225
NAIC #
COVERAGES CERTIFICATE NUMBER 11/12 �L, AUTO, Ut� $SM REVISION NUMBER
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED NOTIMTHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS
INSR 7ypE OF INSURANCE ADDL SUBR POLICY EFF POIICY EXP
L7R yyyD POLICY NUMBER MNI/DD MM/DD LIMITS
GENERAL LIABILITY 11C PS 31872 03/23/2011 3/23/2012 EqCH OCCURRENCE $ 1, OOO, OOO
X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED
PREMISES Ea occurrence S 100 � 000
A CLAIMS-MADE � OCCUR X MED EXP (Any one pereon) $ 5, 000
PERSONAL & ADV INJURY $ 1� OOO � OOO
GENERAL AGGREGATE $ Z� 000 � 000
GEN L AGGREGATE LIMIT APPLIES PER PROOUCTS - COMP/OP AGG $ Z� OOO � OOO
POLICY X E � LOC $
AUTOMOBILE LIABILITY 11C PS 31872 03/23/2011 03/23/2012 COMBINED SINGLE LIMIT $ 1� OOO � OOO
X ANY AUTO (Ea accadent)
A ALL OWNED AUTOS BODILY INJURY (Per person) $
BODILY INJURY (Peracatlent) $
SCHEDULED AUTOS
PROPERTY DAMAGE $
HIRED AUTOS (Peraccident)
NON-0WNED AUTOS $
$
A )( UMBRELLA LIAB X OCCUR 11C LU 31872 3/23/2011 03/23/2012 �CH OCCURRENCE $ 1� ��� � �0�
EXCESS LIAB CLAIMS-MADE AGGREGATE $ 1� OOO � OOO
DEDUCTIBLE $
X RETENTION $ lO OOO g
A WORKERS COMPENSATION 11C PS 31872 03/23/2011 03/23/2012 Y WC STATU- OTH
AND EMPLOYERS LIABILITY Y � N
ANY PROPRIETOR/PARTNER/EXECUTIVE E L EACH ACCIDENT $ 1 OOO OOO
OFFICER/MEMBER EXCLUDED? � N / A
(Mandatory in NH� E L DISEASE - EA EMPLOYE $ 1 000 000
If yes descnbe under
DESCRIPTION OF OPERATIONS below T�P �P E L DISEASE - POLICY LIMIT $ 1 000 OOO
DESCW PTION OF OPERATIONS I LOCATIONS / VEHIC�ES (Altach ACORD 101, Additional Remarks Schedule, i( more space is requlred)
RE BI030LID3 3TORAGE RELOC,ATION - ROOE CONSTRUCTION
ADDITIONAL IN3UREDS ARE INCLUDED A3 REQUIRED BY WRITTEN CONTRACT OR AGREEMENT THIS IN3URANCE IS PRIMARY PER FORM
ATTACHED
PER ANIC GL1061 (03/08)
CK_V [y � � At1
CITY OF BREMERTON
345 6TH STREET #600
SREMERTON, WA 98337
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS
AUTHORIZED REPRESENTATIVE
J
�
�
I Tom Duren/LAV ���� � _ _ __ _
ACORD 25 (2009/09) O 1988-2009 ACORD CORPORATION All rights reserved
INS025 �2oosos� The ACORD name and logo are registered marks of ACORD
.�
ttr' ��� ,:�� � �x � `,
��`lt ` � s �� t f 1
U
ADDITIONAL INSURED (CONTRACTORS} - AUTOMA7IC Si'ATUS WHEN REQUIRED IN COfVSTRUCT10tV
AGREEMENT W1TH YOU
TliiS ENDORSEMERlT CHAPIGES THE POLfCY. PLEASE READ fT CAREFULLY
Th�s endorsement mod�fies insurance provided under the followmg
COMMERCIAL GENERAL LIABILITY COVERAGE PART
Who Is An lnsured (Sectron II) is amended to
include as an insured any person or organization
(herein �eferred #o as an additionai msured}, but
only if you are required to add that person or
organization as an insured fo this pol�cy by a
written contract that �s m effect pnar to the "bodily
Enjury", "property damage", or "personai and
advertising inJury"
2 The �nsurance prov�ded to the add�Uonal insured
�s hmited as foilows
a That person or organization is only an
additional ►nsured if, and only to the extent
that, the ►n�ury or damage is caused by
negiigent acts or omiss�ons of you or your
subcontractor in the performance of "your
work" to wh�ch the wntten contract applies
The person or organ�zation does not qualify
as an additional insured w�th respect to mjury
or damage causad �n whole or in part by
independent negligent acts or omissions of
such person or organ�zation
The insurance prov�ded to the addit�onal
insured does not apply to "boddy �n�ury",
"property damage", or "persona! and
advert�s�ng in�ury" arising out of an architect's,
engmeer's, or surveyor's rendering of or
failure to render any professional seroices
including
� the prepar�ng, approving, or failing to
prepare or apprave maps, drawings,
op�nions, reports, surveys, change orders,
design or specifications, and
u superv�sory, �nspection, or engineer�ng
services
The insurance provided to the addit�onai
insured, referred to m paragraph 1 of this
endorsement, does not cover "bodily miury" or
"property damage" caused by your negl�gent
acts and omissions in the performance of
"your work" that occurs within the "products-
completed operations hazard," unless the
written contraot, referred to in paragraph 1 of
this endo�sement, contams a specific
requirement that you procure completed
operations coverage or coverage w�thm the
"products-campieted operations hazard" for
the additional �nsured However, even if
coverage withm the "products-completed
operations hazard" �s requ�red by the wntten
contact, such coverage �s available to the
additionat �nsured only if the "boddy m)ury" or
"property damage" occurs prior to the end of
the time per�od during wh�ch you are required
by the written contact to provide such
coverage or the expirat�on date of the policy,
whichever cames firsf
3 ff other valid and collectibfe insurance, whether on
a primary, excess, cont�ngent or any other basis,
is avadable to the additionai msured for a loss we
cover under tii�s endorsement, then the insurance
provided by this endorsement �s excess over that
other msurance However, the msurance prov�ded
by this endorsement wifi be primary to other
insurance on which the add�fional insured is a
named Ensured for the covered loss, �f the wr�tten
contract, referred to tn paragraph 1 of th►s
ANIC GL 1061 03 OS
Page 1 of 2
�
� � �.
�����'�� "�� ` ,.. _.�f „ '4 ?� .;�,
endorsement, contams a specific requirement that
this insurance be primary or pnmary and non-
contributory In that case we wdi not share with
that other insurance on a pro-rata or other basis
If the other msuranc� available to the additianal
insured, whether on a pnmary, excess, contingent
or any other basis, �s coverage for which it has
been named as an additional insured, then the
coverage provided by this endorsement is excess
over that other insurance
Th�s endorsement changes fhe poiicy to wh�ch it is attached and, unless otherwise stated, is effective on the date
issued at 12 01 A M s#andard time at your mading address shown m the policy The mformation below is requieed
only when th�s endorsement �s issued subsequent to commencement of the p�licy.
Endorssment Effective
insured
Counte�signed By
ANIC GL 1061 03 08
Policy No
Endorsement No
Page 2 of 2