SUBJECT: Award of Biosolids Storage Study Session Date October 26, 2011
Relocation — Roof Construction Contract COUNCIL MEETING Date November 2, 2011
Department PWU- Forestry
Presenter Bill McKinney
Phone 360 473 5354
SUMMARY: Proposed contract is for construction of two pole -type roofs on two identical existing
facilities at Biosolids Application Site 1 west of Gold Mountain Golf Course. The site has been
permitted for biosolids application since 1989 through the Kitsap County Health District and the State
Dept of Ecology. The existing concrete structures were originally built and used for storage of liquid
biosolids With the construction of the roofs, the facilities will be able to be used to store dewatered
biosolids This project will replace the existing dewatered storage facility adjacent to the Gold
Mountain Golf Course Maintenance Facility and move biosolids storage operations further from the
Golf Course The contractor named below submitted the lowest qualified bid for construction of the
two roof structures
ATTACHMENTS: 1) Contract Documents; 2) Bid Results
FISCAL IMPACTS (Include Budgeted Amount) Amount budgeted in 2011 Wastewater Capital
$125,000 (capital project 5342)
APPROVALS:
DEPARTMENT DIRECTOR
CITY ATTORNEY
INV
FINANCE DIRECTOR `
RECOMMENDED MOTION:
Move to award the Public Works Agreement with Westmark Construction, Inc. Tacoma, WA
for $ 80,178 29 , including WSST for construction of two wood pole roofs to be installed at the
Biosolids Application Site 1 and authorize the Mayor to finalize and execute the agreement with
substantially the same terms and conditions as presented
STUDY SESSION ACTION: El C n nt A nda General Business ❑ Public Hearing
COUNCIL PRESIDENT
COUNCIL ACTION: Approve ❑ Deny able Continue E] Na Action
Forth Updated 4/18/2011