Loading...
HomeMy WebLinkAbout5043Contract Number: Vendor: Sub�ect: Department: File Class: Begin Date: End Date: Review Date: Vault Date: 5043 PUGET SOUND ENERGY, INC Schedule 74 Pro�ect Design Agreement - Pac�fic Avenue 6th to llth Public Works LEG 12-1 4/26/2011 10/31/2011 11/15/2011 Comments : SCHEDULE 74 UNDERGROUND CONVERSION Project Design Agreemer�t Pro�ed Name Pacific Avenue lmorovemerrts. 6 Street to 11�' Street Pro�ect Number 10216 THIS Agr�eme�, dat� as of this � day of ���t Z. , 2011, �s made by and between City of Bremerton, a City (the °Govemment Entity'�, and PUGET SOUND ENERGY, Inc , a Washington Corporation (the "Company"). RECITALS A The Company �s a pubfic service oompany erigaged m the safe ar� d'�strihution of electnc energy and, pursuant to its franchise or other rights from the Govemment Entity, currently locates ds electnc distribution faGiRies within the �unsdict�onal boundaries of the Govemment Entdy B The Govemmer�t Entity i� cons�denng conversion of the Companys ew�mg overhead electnc d�stribuf�on system to a comparabte �nderground eledric dis6ibuUon, as more speafically descnbed m the Scape of Work (as defined �n paragraph 2, beloHr) fum�shhe� to the Company by the Govemmerit EritiEy (the "Conversion Pro�ec� C The GovemmeM Errt�ty has requested that the Company perform certain engineenng design services and othe�v�ns�e woEic Eoo�rattvely with the Govem�ne� Ent�ty to develop a mutusRy acceptable Pro�ect Plan (as defined in paragraph 6, 6elow) for the Conversron Pro}ed, in acoondance with and sub�ed to the terms and conditions of th�s Agreemertt (the "Des�yn Work"). D The Govemment Er�ty and the Company wish to execute th�s wntten contract in acco�dance with Schedule 74 of the Company's Elecc�ric Tar�ff G{"Schedule 74"� to govem the Design Work for the Conversion Project AGREEMENT The Govemmenf Entity and the Company therefore �ree as folt�rrs: 1 Unless specifically defined othervinse herein, alt terms defined in Schedule 7d shall have the same meanings when used in th�s Ag�emerit 2 The Govemment Errt�ty shatl, wEthin ten (1 D} bus�ne� days after the date of this Agr+eement, provide the Company w�th a written scope of waric for the Conversion Projed which indudes, among other thmgs, (a) a reasonably detaded descnp#�on of the scope of the work required for the Conversion Pro�ed, (b) a list of the key miles#one dates for the Conversion Project, (c) reasonably detaited drawnngs showing any assoaat� piann� improvemerrts to the Pablic Thorvughfiane, and (d) a statement as to whether the Govemmerit Errtity desires to install the ducts and vaults for the Conversion Project (�e "Scope of Wotic'�. The Government Ent�ty sha{{ piov�de the Company two (2) hard copies of the Scope of Work and a cxipy of the r�etevarrt etectron�c file(s) m a mutually agreed electronic format. 3 Within ten (10) business days of its r�eceipt of the Scope of Work, the Company shall prepare and submit to the Govemmerrt Errtdy (a) a reasonably detailed, good faith estimate of the cost to pertorm the Design Woric (the "Design Cost Estimate'�, and {b) a proposed schedule for completion of the Design AgreemeM, Attachment �A° fo Schedule 74, Page 1 [Pac�fic Avenue improvements. 6"' Street —11"' Street] Des�gn Woric which, to the exterrt reasonably practicabte, refleds the appl�cable key milestone dates spec�fied m the Scope of VI/ork and prvv�des for complet�on of the Des�gn Work wdhin n�nety (90) business days from the date the Company rece�ves the Govemmerrt Er�tity's not�ce to proc�e�d under paragraph 5, befow (the "Design Schedule'� The proposed Des�gn Cost Estimate and the proposed Design Schedule shali be based upon the then-cuRent Scope of Work. Unless othervvise specified m the Scope of Work, the Design Work shall not inciude negotiation or acqwsition of third party property ngMs but shall tnct�e prehmmary ptanrnng between tl�e Com�rty and the Govemmerrt Ent�ty regarclmg their respedrve obligations for negotiating and acqumng third party property nghts 4 Withm ten (10) busmes.s days after the GovemmeM Entdy's nece�pt of the proposed Des�gn Cost Estimate and the proposed Design Schedule from the Company, the Govemment Entity and the Company shaii meet in onier to {a) review the proposed Design Cost Estimate, (b) review the proposed Des�gn Schedute; (c) rev�ew the Scope of Wor1c, and (d) make any changes necessary to create a final Scope of Work, fmat Design Cost Estimate, and fina! Design Schedule that are reasonably acceptabte to both pa�es. If the parties are unable to agnee upon a final version of the Scope of Work, Design Cost Estimate, and/or Design Schedule, then either party may, by wntten notice to the other party, submrt the matte� for resolut�on pursuant to the dispute resolution procedures in paragraph 16, below. The finai Scope of Work, Des�gn Cost Estimate and Design Scheduie, once determined in accordance wrth th�s paragraph 4, may thereafter be changed or amended only m accordance w�th the char�ge proceduie.s set forth m paragraph 'F3, below 5 The Governmerrt Entity shall, wr�tm ten (10) twsmess days after determmat�on of the final of the Scope of Woiic, Design Cost F_stimate, and Des�gn Schedule, issue (a) a written not�ce to proceed wh�ch shall delmeate the final Scope of Work, Design Cost Estimate, and Design Schedule, or (b) a wntten notice to terminate th�s Agreement v�nthout cost to the Govemment Errtdy If the Govemment Entrty termmates thi� Agreemer�t, the costs mcurned by the Company in prepanng and submrttmg the Design Cost Estimate and the E3esign Scftedute shali not be re�rr�bursabte to the Company, and the nghts and obligat�ons of tt�e paKies under this Agrieemerrt shall be teRnmated m their entirety and without hatnlity to either party. 6 Follov�nng the Company's receipt of the notice to proceed, and vinthm the applicable time period spec�fied �n the Des�gn Schedule, the Company shaN, w�th the cooperation anc3 assistance of the Govemmerrt EMity as outfined m this Agreement� prepare a projed plan for the Conversion Pro�ect (the "Projed Plan"} which shall mdude, among other thmgs, the foilownng• (a) a detailed descnption of the work that is requrred to be pertortned by each party and any third party in connection with the Conversion Project (the "Const�udion Woric'�, (b) the appl�cable requir�mer�ts, drav+nngs, and specifications for the Construc�on Work, (c) a descnption of any operating and other property nghts that are required to be obtained by each party for the Convers�on Pro�ect (and the requiremerrts and specifications with resped ttret�eto}, (d) a detaiFed est�mate of the c�ts to be incumed by each party in �ts pertorrnance of the Construcbon Work, and (e) a detailed schedule for compieting the Constn.idion Work (induding, wr�hout limitation, the dates for delivery of fhe duds and vaults and other matenais for use at the s�te of the Con�nidion Wortc) 7 The Govemment Entity shall be responsible for coordinating the Design Work wdh all other design work to be pertormed m caonnec�ion w�thh the Conversion Pc+oject and any sssoc�ated ptanned improvemerrts to the Pu�ic Thoroughfare The part�es sf�aff arork togeMer rn an effort to md�gate the costs of the Conversion Projec� to each party, including, wdhout limitation, rclerrtifying ways to accommodate the facilities of the Company to be installed as part of the Conversion Pro�ect withm the Pubiic Thornughfare 8 Withm the ap�rcaWe trme penod speafied �n the Des�gn Sc�edule, the Com�ny shall prepare and submit to the Govemmerrt Errtity a proposed u�ifral draft of the Projed Ptan The parf�es understand and acknowledge that the proposed Project Plan submitted by the Company shall be preliminary in nature and shall not indude, without limitatron, information requ�red to be supplied by the Design AgreemeM, Attachment "A' to Schedule 74, Page 2 [Pac�fic Avenue improvemertts: 6�` Street —11"' Street] Governmerrt Ent�ty (e.g., scope and est�mate af the c�st of the ConsEruction Woric to be performed by the Govemment Entrty) 9 Within the applicabte time period specified in the Design Schedule, the Govemmerrt Entdy shall (a) r�eview the proposed Pro�ect Plan submitted by the Company, (b) complete any information reqwred to be supptied by the Govemment Entrty, (c) make any changes required to conform the proposed Project Pfan to the Scope of Work and th� AgreemeM, and (d} retum the amended Pro�ect Plan to the Company 10 Withm the appiicable t�me penod specrfied in the Design Schedule, the Company shall rewew the amended P%�ed Plan submdted by the Governmerrt EMity and not�fy the Govemmerrt Entity �n writing of either the Company's acceptance of, or the Company's speafic ob�ections to, the amended Pro�ed Ptan tf the Compan� makes any nb}ect�on to the amended Pro�ect Plan, and the parties are unable to resolve the objechons a►td mutually agree upon the Project Plan pnor to the final design date specified in the Design Schedule, then erther party may, by written notice to the other party, submd the matter for resoluUon pursuaM to the dispute resolution procedures in paragraph 16, below The Pro�ed Pian, as mutuafly agr�ed upon by the parties or established through the dispute resolution process, shail be attached to and mcorporated in a Pro�ect Construction Agreemerrt substantially in the forrn attached hereto as Exhibd A(the "Construction AgreemeM'� which is to be signed by the part�es pnor ta commencemeM of the Constnidion Work 11 The parties iMend and agree that the Des�gn Work and the Project Pian in its finai form shall conforrn to the follov+nng roequu�ements (a) The Pro�ed Pian shail, if requested by the Govemment EntRy in its irntial Scope of Work, specify that the GovemmeM Erfhty shal! �nstalt the ducts and vautts forthe Conver�on Projed; provided that (� the parties mutuatty �ree u�n and set forth rn the Projed Ptan (A) the c�sts of such mstallation work to be induded in the Cost of Conversion, and (B) the speaficat�ons and standards applicable to such instatiaUon work, and (i� such mstallation worlc is accomplished by the GovemmeM E�ity in accoMance with the appl�cable design and construc�on specifications provided by the Company and set forth m tfie Pro�ect Plan (b) Each estimate af tfte costs to be mcurr� by a party shatl, at a mmimum, be broken down by (�) the design and er�g�neenr�g crosts, (i� property and retated costs, mcluding any costs of obtammg operat�ng nghts, and (ui} construdion casts inctudmg and I�sUng separately inspedion, labor, matenafs, and equipment. (c) All fac�ldies of the Company instailed as part of the Conversion Pro�ect shall be located, and all fe181@d pfOp6t11/ 8Cid O�1'8ti119 f19M5 Sh8li �@ Obt81R4d �n the manr�er set foAh m the applicable pr�ov�sions of Schedute 74. The Projed Ptan shalt describe in detail the location of such facildies, any related �operty and operat�ng rights required to be obtamed, and the relative responsibdities of the pafties wrth respect thereto (d) The schedule set forth �n the Pro�ed Plan for completing #he Constnid�on Work shall include, at a mmimum, milestos�e time penods for completwn ai the Trenchi�g, �nstaitatwn of ducts and vaults, the cor�truc�on ar� rer�val of any Temporary Service, arid ttre removal of overhead fac�l�es. (e) The Projed Plan may indude the spec�ficat�on of work and reqwremerrts for Governmerrt- Requested Upgrades and Company-Indiated Upgrades; provided, however, that the costs incurned by the Company with resped to the design and engineenng of Company-In�tiated Upgrades shatl rrot be �ncluded in the costs r�e�mbursabte to the Company under this Agreement or the Construdion Agreement. Far purpo�es of the foregomg, () fRe term "Government- Requested Upgrade" shall mean any feature of the Urtderground D�stnbubon System which is Design Agreement, Attachment "A° to Sc�edule 74, Page 3 [Pacific Avenue Improvements 6"' Street —19�' Street] requested by the Governmer�t EM�ty and is not reasonabty requ�� to make the Underground Distnbution System comparable to the overhead distnbut�on system �ing replaced, and (n) the term "Company-In�ated Upgrade" shail mean any feature of the Underground Distribution System which is r�uired by the Company and is not reasonabry required to make the Underground Distnbution System comparabie to the overhead d�stnbution system being replaced For purposes of subparagraph (i�, above, a"comparable" system shali include, unless the part�es athennnse agree, the number of emply ducts (nat to exceec! two (2}, iypicaliy hav�ng a diameter of 6" or less) af such d�ameter and number as may be speafied and agreed upon in the final Scope of Work necessary to repiicate the losd-carrying capacdy (system amperage class) of the overhead system bemg r+epiaced For purposes of subparagraph (�, above, any empty ducts instailed at the �quest of the Govemment Er�tdy shail be a Govemme�rt-Requested Upgrade (� The Project Plan shati set fortE� alt speafications. des�gn standards and other requirements for the Construdian Woric and the Conversion Projed, inc{udmg, but not limd� to, the following (i) applicable federal and state safety and elec�nnc c�des and standaNs, (�? applicable construdion and other standards of the Company, and �i) applicable st�et design and other standards of the Govemmerit Ent�ty which are m effect as of the commencement of the Conversion Project 12 Upon reque� of the Govemment Entdy, and m any ever�t at the t�mes s�fied m the Design Schedule, the Company shafi provide penodic reporis wvhich campare fhe actual c�osts of the Design Work incurred to that pamt in time to the D�sign Cost Est�mate, as changed or amended in accordance with paragraph 13, below Further, if at any time the Company reasonably expects that the actual cost of the Design Work witl exceed the Design Cost Estimate, as changed or amended in accor�dance with paragraph 13, below, the Company shali notify the Governmerrt Entdy immediately Upon rece�pt of the Company's nat�ce, the Govemmerrt EMdy may, at rts oplron, (a) nofify the Company m writmg that th�s Agreemertt �s terminated, or (b) request a neasonably detaded explanat�on supported by docume�ation (reasonably satisfactory to the Govemmerrt Enfity) to establish that the aduai costs �n exoess of the Design Cost Estimate are� (i) reasonabte, (i) cons�sterrt with the Scope of Wor1c, and (ii� consistertt with sound engineenng pracuces. If the Govemment E�ty requests an expianat�on, the Governmer�t Entity shail, within ten (10) business days after �eceipt of the exptanation, (a) change the Sc:ope of Work in accordance wdh paragraph 13, below, or (b) direct the Company to corrtmue with the Des�gn Work wdhout a change �n the Scope of Work, but reserving to the Govemment Entity the right to dispute the reasonableness of the costs to be paid the Company under paragraph 14, below, in acxoniance with the dispute resolution procedures in paragraph i6, beiow, or (c) direct the Company ta disc.brrtmue performing the Des�gn Work pertdmg resoiut�on, pursuant to paragraph 16, below, of any dispute r�ardmg the �easonableness of the cwsts, �n wh�ch event the Design Schedule will be ad�usted to reflect the delay, or (d) notify the Company in writing that this Agreement �s term�nated. Design �qreement, Attachment "A° to Schedule 74, Page 4 [Pac�fic Avenue Improvemerns. 6�` Street —11"' Street] In the event the Govemmerrt ErtUty term�nates tlt�s Agreement or d�scorrtmues the pe�fonnance of the Design Work under subpar�raph (c). above, for mor1e than ninety (90) days, the Govemment Entity shall pay the Company for all costs mcurred by the Company in its performance of the Design Work prior to the date the Company receives the Govemment Entity's notice of termination, plus any costs mcurt+ecf by the Company for matenals and other �tems ordered or procured by the Company with the prio� authonzation of the Govemmerrt Errtity m order to meet the schedule for the Conversion Projec�. Ttre foregomg paymer�t obl�gat�on shaN surnve arry terminatMOn of th�s Agreement 13 (a) E�ther party may, at any t�me, by writ#en notice thereof to the other party, request changes to the Scope of Wor1c {a "Request for Change'� No Request for Change shall be effective and bmding upon the parties unfess signed by an authonzed represerrtative of each party If any approved Request for Change woutd cause an �ncrease �n the cost of, or the Ume requ�ced for, the performance of any part o� the Desrgn Work, an eq�dable adjustmer�t in the Design Cost Estimate and the Design Schedule shall be made to reflect such mcrease The parties shall negot�ate in good faith with the objec�ive of agreeing m wrrtmg on a mutuaily acceptabte equitable adjustment If the parties ane unable to agree upon the terms of the equdable ad�ustmerrt, either party may subm�t the matter for resolut�on pursuant to the d�spute resolution procedures in paragraph 16, below Notwdhstanding any d�spute or delay in reaching agreement or amving at a mutuatty aceeptable equ�tabie ad�ustmerrt, each party shall, if requested by the other party, proceed wrth the Des�gn Woric m accor+dance with the Request for Change. Any such �equest to proceed must be accompanied by a written statemerrt setting forth the requestmg party's rEasons for re�eding the proposed equitabie adjustment of the other party (b) The Design Cost Est�mate and/or the Design Schedule shall be equ�tabiy adjusted from time to time to refled any change m the costs or t�me required to pertorm the Design Work to the extent such change �s caused by () any Focce Majeure Everrt under paragraph 17, below, (i) the discovery of any condition wwithhin the Convers�on Ar�ea which affeds the scope, cost, schedule or other asped of the Desig� Work and was not known by or disGosed to the affeded party pnor to the date of this Agreement, or (iu) any change o� inaccuracy m any assumptions regarding the scope, cost, scheduie or other aspeci of the Design Woric which are expressly iderrtified by the part�es in the �na! Scope of Work. Upon the [�equest of either party, the parties wil{ negotiate in good faith with the objectrve of agreemg in waritmg on a mutually acceptabte equitable ad�ustmeM. if, at any time thereafter, the part�es a� unable to agree upon the terms of the eqwtable adjustmer�t, either party may submd the matter for resolution pursuarrt to the dispute resolution prov�ons in paragraph 16, befow 14 Upon completion of the Des�gn Work (i e, the date on which the Pro�ect Pian �s final under paragraph 10, abave, edher by m�tual agreemert of the parties or as esta�"ished through the dispute resolution procedur+es), the GovemmeM Ent�ty shafl pay the Company ail actual, reasonable c�osts to the Company for the Des�gn Work (which, rf disputed rn good faith by the Govemmerrt Errtity, may be submitted by either party for resoiut�on pursuaM to the dispute resolution provisions in paragraph 16, below), plus any c�sts incurred by the Company for matenals and other �tems order�ed by the Company with the prior authonzation of the Govemment Entdy in order to meet the schedule for the Convers�on Project if, theneafter, the Const�vcbon Agreement �s executed by the parties and the Conversion Projed �s completed w�hhm five (5) years from the date of th�s AgreemeM, the full amount of the costs incumed by the ComRany in rts �rtormance of the Design Work shall be included m the "Shar+ed Company Costs" unde� the Construction Agneement and any payment of such amounts under this Agreemer�t shatl be c.�edded to the Govemmem Errtity in calculating the "Net Amount" payable under the Construction Agreement 15 Within sixty (60) bus�ness days after completwn of the Des�gn Work, the Company shall �ssue to the Govemmer�t Entdy an �em¢ed invoice for ttre amounts payable under th�s Agreemerrt. Such mvoice shall � m a foRn mutualiy agreed upon by the Company and the Government EMrty and shall, at a Des�gn Agreement, AttachmeM °A° to Schedule 74, Page 5 (Pac�fic Avenue Improvemerrts 6"' Street —11"' Street] mm�mum, dem�ze the des�gn and eng�neenng crosts, mduding artd t�sti� separately inspection, labor, materials and equipment In the ever�t the GovemmeM Entity does not venfy such invoice wdhm ten (10) bus�ness days af r�ec:eipt, the Govemmerrt Er�tity shalt provide a wntten r�equest to the Company specifying the additionai information needed to verify the invoice The Company wnll provide, within a reasonable penod after r+eceipt of any t�equest, such documer�tation and information as the Govemment E�rtity may reasonabiy request to venfy such �nvoice The Govemment Ent�ty shall pay the Company a�l amounts pgyable under tN�s AgreemeM v�nth�n ttt�rty (30} days after receipt of the Company's invo�ce Payment as provrded rn th�s AgreemeM s�hatl be ful! c�mpensation for the Company's performance of the Design Wortc, induding w�thout Iim�taUon all services rendered and all matenals, supplies, equipmerrt, and maderrtals necessary to compiete the Design Wa�1c. Des�gn Agr�eement, AttachmeM `A" to Schedute 74, Page 6 [Pacific Avenue Improvements: 6"' Street —11"' Street] 16 Dispute Resolution Procedur�es. (a) Any dispute. d�sa,qreemeM or cla�m ansing out of or concemi� th�s Agreement must first be preseMed to and conside�+ed Dy the parties A party who wishes dispute resolution shall notify the other party in writing as to the natur�e of the dispute Each party shall appoint a representative who shaii be nesponsibfe for representmg the party's iMerests The representatrves shall exerase good fa�th efforts to resolve the d�spute Any d�spute that �s not resolved within ten (10} busrn�ss days of the date the disag�+eemerit was fir� ra�sed by written notice shall be referred by the parhes' representat�ves in wr�ting to the sernor management of the parties for resolution. In the eve� the serno� manageme� ar+e unable to resolve the dispute wrthin twerrty (20) business days (or suc� other period as the parties may agr!ee upon), each party may pursue resolution of the dispute through other legal means consisterrt with the terms of th�s AgreemenL Atl nego#�ai�ons pwsuant to these procedut�es for the resotution of disputes shall be confidentiai and shall be treated as compromise and settfement negotiations for purposes of the �ate and f�eraf rules af ev�dence. (b) Any Gaim or d�spute ans�ng he�under wh�ch �lates to the Scope of Wor1c, Design Cost Estimate, and Design Schedule under paragraph 4, above, the Pro�ect Plan under paragraph 10, above, or any Request for Change (including, wrthout limdation, any assoc�ated equrtable ad�ustment) under paragraph 13, above, and is nat resolved by senior management within the time peRnitted under paragraph 16(a), above, shalf be resoivecf by arbrtration in Seattle, Washington, under the Construct�on Indust�y Arh�tration Rules of the Amencan Arbdration Association then in effect Trie decision(s) of the artiitrator(s) shall be final, conGusive and bindmg upon the Parties. Ali other disputes shall be resolved by i�tigat�on m any court or govemmental agency, as appiicabfe, having �unsd�dion over the Part�es and the d�spute (c) In connec�on wFtti any arbitrratron under this paragraph 16, costs of the arbdrator(s), heanng rooms and other common cwsts shall be d�vided equally among the pawes Each party shall bear the cast snd expense of prepanng and prese�rting �ts own case (mdudir�g, but not hmded to, ds ovm attomeys' fees), provided, that, in any arbitration, the arbirtrator(s) may reqwre, as part of his or her decasion, r�eimbursement of ali or a portion of #he prevailing party's costs and expenses by the othe� party. (� Unless othe� agreed by the parties m wntrrtg, the parties shall c�onhnue to perform their resped�ve ob{�gaUons under thrs Agreement dunng the pendency of any dispute. 17 In the eveM that either party is prevented or delayed in the performance of any of ds obl�gations under th�s AgreemeM by reason beyond its reasonable cor�trol {a "Foroe Majeure Event'�, then that party's pertormance shaii be excused dunng the Force Ma�eure Everrt Force Ma�eure Events shall �nclude, wilhout Irm�fation, war, av�l d�sturbance, flood, earthquake or other Act of God, slorm, earthquake or other cond�ion which neces�tates the mobihzation of the perso�nel of a party or �ts contractors to restore utdrty service to customers, laws, regulations, niles or orders of any governmerrtai agency; sabotage, strikes or similar labor disputes mvolrnng personnel of a party, ds contradors or a third party; or any failure or delay m the perfonnance by the other party, or a th�rd party who is not an empioyee, agent or coMractor of the party claiming a Fo�ce Ma�eure Everrt, in connection with the Work or this A�gr�eemecrt. Upon removal or term�nation of the Force Majeure Everrt, the party da�ming a Force Majeur+e Eve�t shall promptiy perfam the affeded obl�gations in an orderly and expedded manner under th�s Agneemerrt or proc:ure a sut�tute for such obligation The parties shall use all commeraally reasonable efforts to eliminate or mirnmize any delay caused by a Foroe Majeune Eve�. 18 This Agreement is sub�ect to the General Rules and Prov�sions set forth in Tanff Schedule 80 of the Company's efedric Tanff G and ta Schedute 74 of such Tarrtf as appmv� bX the Washington UtiM�es and Transportation Commission and in effed as of the date of this Agreement Design Agreement, Attachmer�t "A' to Scfieduie 74, Page 7 [Pac�fic Avenue improvemer�ts 6 S#reet —11 Street] 19 Any not�ce urtder th�s Agreement shall be in wr�Ung and shalt be faxed (�nrtth a copy foliowed by mad or hand delivery), delivered in person, or maifed, properly addressed and stamped with the required postage, to the intended rec�p�errt as follows If to the Govemment Entitv If to the Companv Cdv of Br+eme�ton 3027 Olvmpus Dnve Bremerton. WA 98310 Attn Eduardo Aban. PE Fax 360-473-5398 Puget Sound Energy, Inc 6522 Kitsaa Way Bremerton. WA 98312 Attn Thomas Brobst Fax Edher party may change ds addr�ss spe�ed in this paragraph by giving the other party notice of such change in acxor�dance w�th this paragraph 20 This Agrseement shall in a11 respects be interpreted, constru� and enforced m acxoidance with the laws of the State of Washmgton (wdhout reference to rules govemmg c�nflid of lawrs), except to the extent such laws may he preempt� by the laws of the Unded States of Amenca 21 Th�s Agreement constitutes the ent�� agreement of the part�es �nnth respect to the sub�ect matter he�of and all other agreements and understandings of the Parties, whethe� wrrtten or oral, with resped to the sub�ect matter of this Agreemerrt are hereby superseded m their entireties 22 This Agreemer�t shali be b�nding upon and inure to the benefd of the resped�ve successors, assigns, purchasers, and transferees of the parties, includmg but not limited to, any entity to which the nghts or obligations of a party are assigned, delegated, or transfemed �n any corporate reorgamzation, change of organ�zation, or purchase or transfer of assets by or to another corporation, partnership, association, or ather business orgarnzat�on or division thereof GovemmeM EMdy �/� D�/rIF�?'D� Company PUGET SOUND ENERGY, INC BY l' iTS 112� � Date Signed �'� z� � l � � �. . -. •�� � �� .-.. - w �� � i ITS Municipal Liaison Manaaer Date Signed `"7" " �� �C / Design Agreemerrt, AttachmeM `A' to Schedule 74, Page 8 [Pac�fic Avenue Improvements. 6�' Street —11"' Street]