CONTRACT MODIFICATION AGREEMENT NO.2
BETWEEN THE CITY OF BREMERTON AND
AHBL Consultants
PROJECT Kiwams Park and Green Streets Project
CONSULTANT AHBL
DATE 10 25 11
THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE
Kiwanis Park and Green Streets Proiect AGREEMENT (the "Contract ") entered into
between the City of Bremerton and AHBL on _6.16.11 and as modified on 8.24.11
All provisions in the Contract shall remain in full force and effect except as expressly modified by
this document
For valuable consideration and by mutual consent of the parties, the modifications to the Contract
are as follows
I.
Section I. Scope "is modified as follows See Amended Scope of Work attached as
Exhibit A
Section II. Compensation , is modified as follows
The original contract amount was $76,462.00 The City shall pay the Consultant for the additional
work described above, based on time and materials, an amount not to exceed $1,417.00 for a total
amended contract amount of $85,933.00, including this Contract Modification
II.
Consultant accepts all requirements of this Contract Modification by endorsing below.
Consultant further agrees that this Contract Modification constitutes full and final settlement
of all of the Consultant's claims for contract time and for all costs of any kind, including
without limitation, costs of delays related to any work either covered or affected by this
Contract Modification, claims related to on -site or home office overhead, or lost profits. This
Contract Modification does not limit the City's right to bring a claim for past performance.
The undersigned consultant approves the foregoing Contract Modification as to the changes,
if any, in the contract price specified for each item, including any and all supervision costs and
other miscellaneous costs relating to the change in work, and as to the extension of time
allowed, if any, for completion of the entire work due to said Contract Modification.
CONTRACT MODIFICATION 1
Project Number 5034
This document will become a supplement of the contract and all provisions will apply hereto.
It is understood that this Contract Modification shall be effective when approved by the City
of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a
contract modification that is binding on the parties of this contract. In addition, Consultant
warrants that it has or will inform the surety of this change, and shall take appropriate action
to modify any bonds required under the contract to address this change.
IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day
and year first written above.
Parks and Recreation Director approved to process / (/
Initials and Date
CONSULTANT. THE CITY OF BREMERTON
�'d� - — 9
By Doreen dayin By PAVLent
Its Principal Its or
DATE /I/ DATE
APPROVED AS TO FORM: ATTEST:
r erton City Attorney City Clerk
NOTICES TO BE T TO:
Colette Berna, Park Development Planner
Ed Aban, Engineer
R \LEGAL \Contracts \FORMS \Contract Modification (2003) doc
CONTRACT MODIFICATION 2
Project Number 5034
Exhibit A
°00 Qom❑
00
October 24, 2011
REVISED
Ms. Colette Berna
Park Development Planner
City of Bremerton Parks and Recreation
680 Lebo Boulevard
Bremerton, WA 98310 -3308 Civil Engineers
Project: Kiwanis Park, Our File No. 211174.10
Subject: Revised Contract Amendment Proposal for Supplemental Civil Engineering Services Structural Engineers
Dear Colette. Landscape Architects
We are requesting an amendment to our contract based on the City's request for a Parking
Study to justify the conversion of parallel parking stalls along 4 th Street to diagonal stalls. Community Planners
It is our understanding that the City code requires a traffic study performed by a professional Natural Resource Ecologists
engineer to evaluate the impact of converting parallel parking to diagonal parking. Our study
will include a site visit to document the current parking supply and its utilization during a
typical peak weekday. The study will also provide recommendations for preferred parking Land Surveyors
layout and the lane shift needed to accommodate the shift from parallel to diagonal parking
along 4 th Street within the study area. Neighbors
The estimated total for Amendment 2 is $1,417. An hourly break down of the proposed hours
and fees can be found on the attached Exhibit B.
If you find this proposal acceptable, please prepare your standard amendment documents.
Our receipt of your written authorization will be our notification to proceed. If you have any
questions, please call me at (253) 383 -2422.
Sincerely, °
Doreen S. Gavin, PE, LEED° AP
Vice President
DSG /lsk
Enclosure
C. David Nason, Accounting - AHBL
Q \ 2011\ 211174 \Proposais_Contracts \Flnals\ 20111024 _Pro_(Amendment2)_(REV)_211174 30 d0oc
TACOMA
2215 North 30th Street
Suite 300
Tacoma, WA 98403 -3350
253 383 2422 TEL
253 303 2572 FAx
www ahbl corn
EXHIBIT B
AHBL Staff Hours per Task
AHBL Project #► 21117410
Amendment 2 - Kiwanis Park
CIVIL ENGINEERING
Work Task Total Total DG DN JC LG MS/TS SG/UK
I TASK 10 Parking Study Task Cost ($) Task Hours Prin/PM Team LD QC/nR PE 2 TECH 3 Ad Asst
000
101 Research & Site Visit 700 1 6
102 Technical Memorandum 1250 0S 2 8 2
Total Task 30 - Parking Study 1950 OSO 300 000 800 0.00 2.
Billing Rate $150 00/hr $150 00 /hr $150 00/hr $94 00/hr $108.00/hr $70 00/h
Task Total $ 1,41700 $ 7500 $ 45000 $ - $ 75200 $ - $ 14000
Total Contract Amount $ 84,S1600
Amendment 2 - Klwanis Park Total $ 1,417 00
TOTAL REVISED CONTRACT AMOUNT $ 85,933.00
1
Q.\ 2011\ 211174\ Proposals _Contracts \Fnals\20311024 Work Task_Hour Breakdown _()CFvamsPark)_(Amend2)_21117410
Letter of Transmittal
0
To: City Clerk Office Date: 12/5/11
City of Bremerton Project No.: 211174 10 Task:
345 6 th Street, Suite 600 Project Name: Kiwanis Park & Green Streets
Bremerton, WA 98337 Regarding: Mod #2
Phone No.:
Fax No.:
WE ARE SENDING:
NO. COPIES DATE DESCRIPTION
1 11/9/11 Mod #2
THESE ARE SENT VIA:
® Mail ❑ Client Pick -up
❑
Fed Ex ❑ Other•
❑ Hand Delivered
THESE ARE TRANSMITTED:
❑ For your review-and-comment ❑ Reviewed as noted
® For your use ❑ As requested
❑ For approval
REMARKS:
Enclosed please find the signed mod for the above referenced project I apologize for the delay
Thank you
Signature RECEIVED
OFFICE OF CITY CLERK
DATEI
Printed Name
Billing Mgr SIGNATURE
Title
c TACOMA
2215 North 30th Street
Sude 300
Tacoma, WA 98403 -3350
253 383 2422 TEL
253 383.2572 FAX
www.ahb /.coin
Contract Number: 5034
Vendor: AHBL
Subject: Kiwanis Park & Greens St Project - Eng Svcs
Department: Parks
File Class: LEG 12 -1
Begin Date: 5/18/2011
End Date: 6/1/2012
Review Date: 5/1/2012
Vault Date:
Comments: Mod #1 8 -29 -11
CONTRACT MODIFICATION AGREEMENT NO. 1
BETWEEN THE CITY OF BREMERTON AND
AHBL Consultants
PROJECT Kiwams Park and Green Streets Project
CONSULTANT AHBL
DATE 8 29 11
THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE
Kiwanis Park and Green Streets Proiect AGREEMENT (the "Contract ") entered into
between the City of Bremerton and AHBL on 6.16.11 and as modified on 8.24.11
All provisions in the Contract shall remain in full force and effect except as expressly modified by
this document
For valuable consideration and by mutual consent of the parties, the modifications to the Contract
are as follows
I.
Section I. Scope , is modified as follows See Amended Scope of Work attached as
Exhibit A
Section _ II. Compensation , is modified as follows
The original contract amount was $76,462.00 The City shall pay the Consultant for the additional
work described above, based on time and materials, an amount not to exceed $8,054.00 for a total
amended contract amount of $84,516.00, including this Contract Modification
II.
Consultant accepts all requirements of this Contract Modification by endorsing below.
Consultant further agrees that this Contract Modification constitutes full and final settlement
of all of the Consultant's claims for contract time and for all costs of any kind, including
without limitation, costs of delays related to any work either covered or affected by this
Contract Modification, claims related to on -site or home office overhead, or lost profits. This
Contract Modification does not limit the City's right to bring a claim for past performance.
The undersigned consultant approves the foregoing Contract Modification as to the changes,
if any, in the contract price specified for each item, including any and all supervision costs and
other miscellaneous costs relating to the change in work, and as to the extension of time
allowed, if any, for completion of the entire work due to said Contract Modification.
CONTRACT MODIFICATION 1
Project Number 5034
This document will become a supplement of the contract and all provisions will apply hereto.
It is understood that this Contract Modification shall be effective when approved by the City
of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a
contract modification that is binding on the parties of this contract. In addition, Consultant
warrants that it has or will inform the surety of this change, and shall take appropriate action
to modify any bonds required under the contract to address this change.
IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day
and year first written above.
Parks and Recreation Director ap to p rocess - A / 6
2�1
PP p
Initials and Date
CONSULTANT. THE CITY OF BREMERTON
By Doreen Gavin By P t Lent
Its Principal Its yor
DATE " tJ0 -:1 DATE
APPRO TO FORM: ATTEST:
&96(1
merto tty Attorney City Cler
NOTICES TO BE SENT TO:
Colette Berna, Park Development Planner
Ed Aban, Engineer
R \LEGAL \Contracts \FORMS \Contract Modification (2003) doc
CONTRACT MODIFICATION 2
Project Number 5034
�
Contract Number: 5034
Vendor: AHBL
J
5ub�ect: Kiwanis Park & Greens St Pro3ect - Eng Svcs
Department:
File Class:
Begin Date:
End Date:
Parks
LEG 12-1
5/18/2011
6/1/2012
Review Date: 5/1/2012
Vault Date:
Comments :
PROFESSIONAL SERVICES AGREEMENT
Engineering Services for Kiwanis Park and Green Streets Project
The Crty of Bremerton ("CiTy") and AHBL ("Consultant"), referred to collectively as the
"Parties," enter into the followmg Agreement for professional services
I. Scope: The Consultant agrees to perform the services more specifically described �n the
Scope of Work, dated Mav 18, 2011, mcludmg any attachments thereto, attached hereto as
Exhib�t A, which is mcorporated by reference herein The Scope of Work may be modified only
pursuant to Section VII G of this Agreement If the Scope of Work prov�des for unspecified
addrtional services such services shall only be performed upon the express wr�tten request of the
City Consultant further represents that the services furnished under this Agreement will be
performed in accordance wrth generally accepted professional practices m effect at the time such
services are performed
II. Term: The City and the Consultant agree that work will begin on the tasks descnbed in
Exhibrt A immed�ately upon execution of this Agreement. The parties agree that the work
described in Exhibrt A is to be completed as provided for in the work schedule attached hereto as
Exhibrt B, provided however, that addrt�onal time shall be granted by the City for excusable
delays or extra work as provided for in section IX (A) of this agreement
III. Compensation: In consideration of the serv�ces provided pursuant to this Agreement, the
Crty shall pay Consultant in an amount not to exceed $7b.462 00 Consultant's charges and bills
shall conform to the fee schedule attached hereto as Exhibrt C and mcorporated herein by this
reference
The Consultant shall submrt regular billmg statements detailmg work performed and
amount charged on each task or portion thereof The descriptions shall conform to and fall
within the categories set out in the Scope of Work and/or Fee Schedule Upon receipt of a
conforming billing statement, the City shall promptly process payment. PROVIDED,
HOWEVER, the City reserves the right to pnont�ze scoped work and accelerate and/or delay
work tasks under the time frame set forth m Section II herem The Consultant's labor rates and
billmg fees shall be as delmeated m Exhibrt C
Consultant shall not perform work beyond the Scope of Work, nor shall be compensated
for such work, unless the Scope of Work or amount of compensation is modified pursuant to this
Agreement Consultant shall only be compensated for additional serv�ces if requested pursuant
to Section I and, if not otherwise provided, such compensat�on shall be m accordance with
Exhibrt C.
If a billing statement does not conform to this Agreement, the City may withhold
payment until the statement is brought mto compliance Such w�thholdmg does not relieve
Consultant of rts obligations under this Agreement
B remcrt�n °r� E � [3l_
1�r`��ms t'arl. anci (�iecn 5t�ects I'rc>>�ci
Pa�e 1 �►i't�
IV. Relationship of Parties: Consultant represents that �t is skilled in the matters addressed
in the Scope of Work and is performmg independent functions and responsibilrties wrthin its
field of expertise Consultant and rts personnel are mdependent Consultants and not employees
of the City Consultant and its personnel have no authority to bmd the City or to control the
Crty's employees and other Consultants. None of the benefits provided by the C�ty to rts
employees, mcluding, but not lim�ted to, compensation, msurance, and unemployment msurance
are available from the C�ty to the employees, agents, representat�ves, or sub-Consultants of the
Consultant. Consultant will be solely and entirely responsible for rts acts and for the acts of
Consultant's agents, employees, representatives and sub-Consultants during the performance of
this Agreement. The CiTy may, duruig the term of this Agreement, engage other mdependent
Consultants to perform the same or similar work
As an mdependent Consultant, Consultant is responsible for its own management. The
City's administration and enforcement of this Agreement shall not be deemed an exercise of
managerial control over Consultant or its personnel
As an mdependent Consultant, Consultant is responsible for payment of all taxes and
licensing fees necessary to perform its obligations under this Agreement. These taxes and fees
mclude but are not limrted to State mdustrial insurance, Busmess & Occupation, State
professional licensmg, and Crty business licensing If any taxes or fees due the C�ty have been
declared delmquent, the Criy may wrthhold the delmquent amount, plus any addrtional charges
ansmg from the dehnquency, from any payments due Consultant
V. Indemnification: Consultant shall defend, indemnify and hold the City, its officers,
officials, employees, agents and volunteers harmless from any and all claims, in�uries, damages,
losses or suits, mcludmg all legal costs and attorney fees, ansmg out of or in connection wrth the
performance of this Agreement, except for that portion of the in�uries and damages caused by the
City's sole negligence
The C�ty's review or acceptance of any of the work when completed shall not be grounds
to avoid any of these covenants of indemnification
Should a court of competent �urisdiction determme that this Agreement is sub�ect to
RCW 4.24 115, then, in the event of liabilrty for damages ansmg out of bodily mJury to persons
or damages to property caused by or resulting from the concurrent negligence of the Consultant
and the Crty, rts officers, officials, employees, agents and volunteers, the Consultant's liabilrty
hereunder shall be only to the extent of the Consultant's negligence
IT IS FURTI�R SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES TI� CONSULTANT'S
WANER OF IMMUIVITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY
FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FUR'TI-�R
ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER
The provisions of this section shall survive the expiration or termmation of this Agreement
13� emerr�nit�i �t31_
hi�van�s f��rk aiicl G«;en 5tieeis i'ro�ect
1'a�e 2 ai 6
VI. Insurance: The Consultant shall procure and mamtam for the duration of the Agreement,
msurance agamst claims for m�uries to persons or damage to property which may arise from or m
connection w�th the performance of the work hereunder by the Consultant, �ts agents,
representatives, employees, sub-consultants or sub-Consultants
Before begmnmg work on the pro�ect described in this Agreement, the Consultant shall
provide a Cerhficate of Insurance evidencmg
1. Automobile Liabilitv insurance wrth limrts no less than $1,000,000 combmed single
limrt per accident for bodily in�ury and property damage, and
2. Commercial General Liabilitv msurance written on an occurrence basis w�th limits no
less than $1,000,000 combined single limrt per occurrence and general aggregate for
personal injury, bodily injury and property damage Coverage shall mclude but not be
limited to• blanket contractual; products/completed operat�ons/broad form property
damage; explosion, collapse and underground (XCL� if applicable, and employer's
liabihty, and
3. Ezcess Liabilitv insurance w�th lim�ts not less than 1,000,000 lunrt per occurrence and
aggregate
4. Professional Liabilitv insurance with lunrts no less than $1,000,000 lumt per
occurrence/claim
Any payment of deductible or self insured retention shall be the sole responsibility of the
Consultant
All required policies shall be provided on an "occurrence" basis except profess�onal
liabilrty msurance (if required), which may be provided on a"clauns-made" basis
The City shall be named as an additional insured on the Commercial General Liabil�ty
insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an
endorsement that is acceptable to the Crty, which names the City as an addrtional msured shall be
attached to the Certificate of Insurance The City reserves the r�ght to receive a certified copy of
all the requ�red msurance policies and endorsements The C�ty further reserves the right to reJect
any unacceptable policies and/or endorsements
The Consultant's Commercial General Liability insurance shall contam a clause stating
that coverage shall apply separately to each insured agamst whom claim �s made or suit is
brought, except wrth respects to the limits of the insurer's liabilrty
The Consultant's msurance shall be primary insurance as respects the CiTy and the Crty
shall be given thirty (30) days prior written notice by certified mail, return receipt requested, of
any cancellation, suspension or material change in coverage
The City also reserves rts unqualified nght to require at any tune and for any reason,
proof of coverage in the form of a duplicate of the insurance policy with all endorsements as
evidence of coverage
B� cmerfUnJ Ai tl�l,
i�n��an�s �'arl. anci G�een St�ects Prc��cct
Pa�;e 3 at G
VII. Genera! Conditions:
A Reports and Information When requested by the City, Consultant shall furnish
per�odic reports and documents on matters covered by this Agreement The reports and
documents shall be furnished m the time and form requested. Consultant shall maintam
accounting records m accordance wrth Generally Accepted Accounting Prmc�ples (GAAP) to
substantiate all billed amounts
B Ownership and Use of Records and Documents Ongmal documents, drawings,
designs and reports, mcluding those in electromc format, developed under this Agreement are the
property of the Crty All written mformation subm�tted by the Crty to the Consultant in
connection wrth the services performed by the Consultant under this Agreement will be
safeguarded by the Consultant to at least the same extent as the Consultant safeguards like
information relating to its own busmess If such informat�on is publicly available or is already m
Consultant's possession or known to rt, or is r�ghtfully obtamed by the Consultant from third
parties, Consultant shall bear no responsibil�ty for rts disclosure, madvertent or otherwise
All data, documents and files created by Consultant under this Agreement may be stored
at Consultant's office in Tacoma, Washmgton. Consultant shall make such data, documents, and
files available to the Crty upon rts request at all reasonable times for the purpose of edrtmg,
modifymg and updatmg as necessary until such time as the Crty is capable of storing such
informat�on in the C�ty's offices. Duplicate cop�es of this mformation shall be provided to the
City upon rts request, and at reasonable cost
All documents, includmg all reports, drawings, specifications, computer software or other
items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service
wrth respect to the project and are the property of the Crty Any reuse by the Crty for other than
the spec�fic purpose intended will be at Crty's sole r�sk
C Work Performed at Consultant's Risk Consultant shall take all precautions necessary
and shall be responsible for the safety of rts employees, agents, and sub-consultants m the
performance of the work hereunder and shall utilize all protection necessary for that purpose
All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss
of or damage to materials, tools, or other art�cles used or held for use m connection wrth the
work
D Place of Work The Consultant shall perform the work authorized under this
Agreement at rts offices m Tacoma, Washmgton. Meetmgs wrth the City staff as descnbed in
Exhibrt A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed
upon by the parties
E Enhre Agreement• This Agreement and its Exhibits constitutes the entire agreement
between the Parties, and the Part�es acknowledge that there are no other agreements, written or
oral, that have not been set forth m the text of this Agreement
Bi•emerton: A1 t[3[�
hr���an,s t���rlc ���ci U�een 5t�ecis Prorccr
Pd�e -� C31 ()
F Severabilrtv• Should any part of th�s Agreement be found void, the balance of the
Agreement shall remain in full force and effect
G Modification This Agreement may only be modified by wr�tten mstrument s�gned by
both Part�es.
H Written Not�ces All commumcations regarding th�s Agreement shall be sent to the
parties at the addresses listed below by registered or lst class mail, or by personal serv�ce, and
shall be deemed sufficiently given if sent to the addressee at the address stated m this Agreement
or such other address as may be hereafter specified m wr�ting
Crty Address
680 Lebo Blvd
Bremerton, WA
98310
Consultant Address
2215 North 30�' Street
Surte 300
Tacoma, WA 98403-3350
I Waiver• Failure to enforce any provision of this Agreement shall not be deemed a
waiver of that provision. Waiver of any right or power ar�smg out of this Agreement shall not be
deemed waiver of any other right or power
J Non-Waiver of Breach The failure of the Crty to insist upon str�ct performance of any
of the covenants and agreements contamed herem, or to exercise any option herem confened in
one or more instances shall not be construed to be a waiver or relinquishment of said covenants,
agreements or opt�ons, and the same shall be and remam m full force and effect
K Compliance with Laws• Consultant shall comply wrth all applicable Federal, State,
and local laws m performing rts obligations under this Agreement
L Choice of Law and Venue This Agreement shall be mterpreted according to the laws
of the State of Washington. Any �udicial action to resolve disputes ansmg out of this Agreement
shall be brought m Kitsap County Superior Court
M Attornevs' Fees In the event of lrtigation to enforce any of the terms or provisions
herem, each party shall pay all �ts own costs and attorney's fees
N Assi nment Any assignment of this agreement by the Contractor w�thout the written
consent of the City shall be void
VIII. Nondiscrimination: Consultant shall not discrimmate m employment or services to the
public on the basis of race, color, national origm, sex, religion, age, marrtal status, disability, or
sexual orientation except for employment actions based on bona fide occupational qual�fication.
IX. Termination: This Agreement shall remam in force until completion and acceptance of
the services, terminated by written insirument upon mutual consent, or by the City of Bremerton
for convenience This Agreement may be immediately terminated for cause by a Party if the
Ri emert�nr'�t �L3L.
hr�4�an�s P:�k anci C;teen 5tteei5 Pro�ect
Pa�;e S ai �
other Party substant�ally fails to perform liuough no fault of the termmat�ng Party, and the non-
performing Party does not commence correction of the failure of performance withm thuty (30)
days of the terminatmg Party's sendmg notice to the non-performmg Party. Any Not�ce by
Consultant shall include a report showing the status of all �tems I�sted m the Scope of Work
current through the termination date
If the C�ty receives reimbursement by any federal, state, or other source for work descnbed �n
Section I here�n, and that fund�ng is �v�thdrawn, reduced or limrted m any way, or the pro�ect is
cancelled or substantially reduced aft�r the execution date of this Agreement and pnor to the
completion of the work, the C�ty may summar�ly term�nate tiiis Agrcement
A. Excusable Delays• The rigirt of Consultant to proceed shall not be termmated nor shall
Consultant be charged with liquidated damages for any delays m the completion of the work due
to 1) any acts of the federal government �n controll�ng, restrictmg, or requisttionmg materials,
equipment, tools, or labor by reason of war, national defense, or other nat�onal emergency, 2)
any acts of the C�ty, rts consultants, or other public agenc�es causmg such delay, and 3) causes
not reasonably foreseeable by the parties at tfie time of the execution of tfie Agreement that are
beyond the control and without the fault or negligence of the Consultant, includmg, but not
restricted to, acts of God, fires, floods, strikes, or weather of unusual severity PROVIDED,
HOWEVER, that the Consultant must promptly notify the City w�thm ten (10) calendar days in
wrrtmg of the cause of the delay. I� on �the basis of the facts and the terms of this Agreement,
the delay is properly excusable, the City shall, m writing, extend the time for complet�ng the
work for a penod of time commenswate w�th the penod of excusable delay
B Ri ng t`pon Termination• In the event of termmation, the City shall pay for all
serv�ces performed by the Consultant to the effective date of termmation, as described on a final
mvoice subm�tted to the City After termmation, the C�ty may take possession of all records and
data w�thm the Consultant's possesston pertainmg to this proJect which may be used by the City
without restriction Any such use not reiated to the pro3ect wh►ch Consultant was contracted to
perform shall be w�thout ltabil�ty or 1ega1 exposure to the Consultant
CONSULTANT
�,.. -,. , .
-,�
� .-__��
� � --
.� � �r�.
R V.,EGAL\Contracts�FORMS�Professwnal Services Agreement Form (2003) doc
i, , =r
. -
.
,,
� . . . __ .
�.I � G
E�t�emertunlll( {l3 L
hn��an�s ['.t�k a�i�1 (,�ten 5ueet5 Pro�4ct
Pa�e �i c►! (�
CITY OF BREMERTON
�`� ��
b3- . �
�� � �
:A �i ��B L:.
�,_� . .
May 18, 2011
: a / �a
Ms. Colette Berna
Park Development Planner
City of Bremerton Parks and Recreation
680 Lebo Boulevard
Bremerton, WA 98310-3308
Pro�ect Kiwarns Park and Green Streets ProJect, Our File No 211174 10 and 211174 11
Sub�ect. Revised Proposal for Gvil and Structural Engineermg Sennces
Dear Colette:
Thank you for the opporturnty to submit this revised proposal for civd and structural
engineering services for permittmg and construction documents for selected portions of the
Kiwanis Park and Green Streets Low Impact Development pro�ect This proposal is modified
from the originai based upon my meeting with Eduardo Aban and Wyn Birkenthal, and
discussions with you. We look forward to this opporturnty to work together with you and City
staff
Project Description
The pro�ect includes improvements at Kiwarns Park and along 4"' and 5�' Streets m Bremerton
The park improvements mclude redevelopment of the lower park to provide improved
dramage, play area, slabs for a sheiter and other site fumishings, foundation and ut�lit�es for a
new restroom buildmg, and fencing and nettmg at the east property Ime. Park improvements
also mclude a porous asphalt pathway and improvmg the connection between the east and
west halves of the park, including concrete stairs, ramps, and site walls We understand that
stormwater may be accommodated through LID measures (a ram garden or infiltrat�on
trenches) and the existmg connection from two catch basms at the tenrns courts to the
combmed sanitary sewer wdl be removed.
The pro�ect also mdudes "Green Streets" improvements to both 4"' and 5"' Streets from
Kiwanis Park to Warren Avenue These improvements include curb extensions and traffic
arcles designed to serve as dramage faalitaes, sidewalk improvements to accommodate tree
grates and a new porous concrete sidewalk along the park frontage, channelization, and
signage design for a bike sharrow along both roadways
We understand the City of Bremerton wdl provide the followmg:
• Landscape and Irrigation Plans, Specifications, and Estimate (PS&E) for each
phase
• Public Outreach
• AutoCAD base drawing for 4"' Street and 5"' Street right-of-way to be used as the
basis of the engmeering drawmgs for the Green Streets proJect We recommend
a horizontal scale of 1"=20'.
• 3U% Design Drawmgs for 4�' Street and 5�' Street
C�wf Engmeers
SUUCtwal Engineers
Landscape Arehdects
Community P/anners
Natural Resource Ecologists
Land Surveyors
Neigh6ors
TACOMA
221i Nordi 301h Street
SuNe3oo
Tacoim,WA 984033350
253.3832422 �
253 383.�72 Fnx
wvvw ahb! com
Ms Colette Bema
May 18, 2011
211174 10 and 211174 il
Page Z of 6
As you requested, we have prowded separate scopes of servioes for the two pro�ects, Kiwanis
Park and Green Streets. Addit�onally, our work effort is broken down per tasks. We
understand that the two pro�ects wdl be designed concurrently and advertised as one
construchon pro�ect. Our soopes of services are listed below
Prnject5avpe — KirYanis Par� Pr�ujectlVo. Z11.I7�10
Task 1— Pro�c�t Management
1 1 Provide overall pro�ect admmistrat�on and management for the duration of the pro�ect,
from the schemat�c design phase completed by the Gty through the PS&E phase.
1.2. Provide monthly �nvoices and badcup in accordance with the format agreed upon by the
City Pro�ect Manager Progress reports describmg the work accomplished dunng the
bdling penod shall be prepared and submitted to the City with the monthly invoice.
Deliverables: Monthly invoice and progress report.
Tasks 2 and 3— Existing Cond�tions Inventay and Reports
Land Surveyrng Servrces
2. i. Rev�ew of the Prelimmary Topographic Survey of Kiwanis Park by the Gty's consultant.
We wdl review for completeness to be used as the bas�s of our construction drawmgs
2.2 Provide the Gty a sketch showmg the locations for spot elevations and ut�lity elevat�ons
to be provided by the Gty along 4"' and 5"' Streets
Deliverables: A memo prowding comments on the Prelimmary Topographic Survey of
Kiwarns Park and a sketch showing locations for additional elevahons along 4"' and 5"' Streets
Geotechnica/ Investigahons and Design Recommendahons — Perrone ConsWbng
3.1. S�te Explorat�ons• Excavate a total of four to six exploratory test pits at the proposed
ram garden, restroom, and retaming wall loca�ons. We wdl subcontract with backhce
and prowde our field engineer to log the test pits and obtam samples. Perform one
infiltration test m a test pit.
3.2. Laboratory Tesbng: Perform four gram size analyses.
3.3. Engineenng Analysis• Evaluate design parameters for 1) rain garden infiltrabon rates,
2) restroom foundatrons and slab, 3) retainmg walls, and 4) porous sidewalk.
Deliverables: Prepare a report summarizing our design recommendat�ons mcluding site
preparat�on, re-use of onsite soils, matenal speaficat�ons, and compaction requirements.
Tasks 4 throuah 7— Construct�on Documents �30%. 60%. 90%, and 100%_ P58tE1
41 Prepare plans and calculat�ons for a Temporary Erosion and Sedimentation Control Plan,
mdudmg clearmg and any reqwred demoliUon A Construction Stormwater Pollution
Prevention Pian wdl be prepared to meet City requirements.
,
• =r '
�
- i ;,f ;� .��
:A ` �_ .. _:�
Ms. Colette Berna
May 18, 2011
211174 30 and 211174 11
Page 3 of 6
4.2 Prepare a gredmg plan for the lower field and the transition between the upper field and
the lower field. It is anticipated that concrete site walls, stairs, and ramps wdl be
provided
4.3 Prepare plans and calculations for a storm dramage pian. This scope of work mcludes a
design to meet the Stormwate� Management Manual for Westem Washington, as
adopted by the City of Bremerton This plan will address•
a Onsite stormwater runoff collection, includmg any underdrams for the turf and
play area
b. Hydrologic Calculations/Detention Most likely, the lower field improvements wdl
trigger flow control (detention) requirements Our fee includes the hydrologic
calculations and design of a relatively small flow control faality (rain garden) to
account for the increase in flows
Water quality treatment for the redeveloped field wdl be addressed by a
landscape management plan (LMP) prepared by the Parks and Recreation
Deparlment
4.4. Prepare a site dimensionmg plan for the horizontal control of the new site features
4.5 Structural design of site related work, which mcludes concrete stairs, ADA ramp, site
walls less than 8 feet m height, and site furroshmgs pads, as depicted in the park
concept drawmg Additionally, our structural services wdl mclude a foundat�on/slab
design for a pre-engmeered restroom and a picrnc shelter We will prepare structural
calculations and engineered construction drawings for the key structural components
4 6 Prepare technical specifications for civd and structural site work for bidding of the
pro�ect
4.7. Prepare an opmion of probable construction cost.
4.8. Revise the plans as required by agency review and based upon review comments
received on the previous submittal. This task mcludes meetings with you to review
agency comments
4 9 Reimbursable expenses such as mileage and reprographics
Deiiverables: Submit progress sets to you at the end of 30%, 60%, 90%, and 100% Design
The followmg products will be prepared at the end of the each phase, except as noted•
30% Phase
• Cover Sheet
• Site Horizontal Control and Pavmg Plan
• Dramage and Gradmg Plan
• Opirnon of Probable Construction Cos#
• Geotechrncal Report
�
�� .,�`
�R:
'�.� � � �
q; �:H �8�,� iL�
Ms Colette Bema
May 18, 2011
21117410 and 211174 11
Page 4 of 6
60% and Subseauent Phases:
• CoverSheet
• Site Honzonta) Control and Pavmg Plan
. Drainage and Grading Plan
• Opmion of Probable Construct�on Cost
• ESC and Site Demo Plan
• ESC Notes and Detads
• Notes and Detads
• Foundat�on Design Plan and Detads
• Site Wall Elevat�ons and Detads
• Structural Calculations
• Techrncal InfonnaUon Drainage Report
• Techrncal Speaficat�ons for Gvd Site Work
• Geotechrncal Report
Proje�ct Saope — Green SYne�ets, Proiect /Vo. 21I174.11
Task 1— ProJect Management
1.1 Provide overall pro�ect admirnstrat�on and management for the duration of the pro�ect,
from the schemat�c design phase completed by the Gty through the PS&E phase
1.2 Prowde monthly invoices and backup in aaordance with the fonnat agreed upon by the
City Pro�ect Manager Progress reports descnbing the work accomplished dunng the
bdling penod shall be prepared and submitted to the City with the monthly mvoice.
Deliverables: Monthly mvoioe and progress report
Tasks 2— Geotechnical Investiaations and Desgn Recommendations — Perrone Consu/tin4
2 1 Site Explorat�ons. Dnll six exploratory bonngs to a depth of 10 to 12 feet for a total
footage not to exceed 72 feet. Bormgs wdl be located at each block between the park
and Warren Avenue along 4"' and 5�' Streets We wdl log the bonng and obtain sod
samples at 2.5-foot mtervals for lab testing. This scope will require pnor approval by
the City for every bonng
2.2. Laboratory Tesdng Perform six grain size analyses.
2 3 Engineenng Analysis Evaluate des�gn parameters for ram garden infiltrat�on rates.
Deliverables: Prepare a report summanzing our design recommendat�ons includmg site
preparat�on at ram gardens and a design mfiitration rate.
Tasks 3 through 6— C'onstruction Documents (30%, 60% .90%, and 100% P58rEJ
3.1. Prepare roadway plans and details for the construction of curb extensions and/or traffic
circles designed to serve as rain gardens along 4"' and 5"' Streets from west end of
Kiwanis Park to Warren Avenue
� S� ��
����
�:A M� �B; �L�
Ms Colette Bema
May 18, 2011
21117410and21117411
Page 5 of 6
3 2 Prepare plans and calculations for a storm drainage plan This scope of work includes a
design to meet the Stormwater Management Manual for Western Washmgton, as
adopted by the City of Bremerton This plan wdl address hydrologic analys�s and design
for ra�n gardens at curb extensions and tra�c arcles. The analys�s wdl be included m
the Kiwanis Park Dramage Report.
33
34
35
36
Prepare channelization and signage plans to accommodate bicycle lanes
Prepare traffic control plans.
Prepare technical specifications for uvd and structural site work for biddmg of the
pro�ect Specifications will be combined with the Kiwanis Park pro�ect
Prepare an opinion of probable construction cost.
3.7 Revise the p�ans as required by agency review and based upon review comments
received on the previous submittal This task mciudes meet�ngs with you to review
agency comments
3 8 Reimbursable expenses such as mileage and reprographics.
Deliverabtes: Submit progress sets to you at the end of 30%, 60%, 90%, and 100% Design
The foliowing products wdl be prepared at the end of the each phase, except as noted•
30% Phase.
• Hydrologic Calculations for sizmg the ram gardens
• Opinion of Probable Construction Cost
• 4"' and 5"' Street Plans provided by the City
. Geotechrncal Report
60% and Subseauent Phases
. 4"' Street Roadway and Sidewalk Improvements
• 5"' Street Roadway and Sidewalk Improvements
• Opmion of Probable Construction Cost
• Notes and Detads
• Technical Information Drainage Report
• Technical Specifications for Civd Site Work
Optional Task 6— Bicyc% Subconsultant
We propose subcontracting with Alta Plannmg for their review and recommendation for bicycle
safety This scope, if authorized by you, includes
61
62
Review 30% design concept and provide wntten comments on parkmg and sharrows
Participate m a conference cail to discuss 30% design and comments.
�.� ` <�
����
,�p� �H; �Bj ;L�
� .,.. __ _-
Ms Golette Bema
May 18, 2011
211174 10 and 211174.11
Page 6 of 6
Bi//ingSummary
We propose to bill for our services on a time and expense basis, broken down by task. Our
estimated fee for the above services is summanzed below, and a detaded breakdown per task,
disapline, and subconsultant is also provided for your review m the attached Exhibit A. If we
have mrsunderstood your expectat�ons for scope or level of service, we would be happy to
meet with you and discuss additions or deletcons from our proposed services
Kiwarns Park
Green Streets
Opbonal Bicycle Subconsultant
Total
Ssaar�e Exdusions
$51,206
$23,859
$1,397
$76,462
This proposal does not �nclude fees assoaated with agency reviews, submittals, or
permits, nor dces it include any work assoaated with the followmg services:
a)
b)
SEPA, NPDES General Perm�t for Stormwater from Constructron Srtes.
Design of site retammg watls over 8 feet m height, the restroom budding, and the
picrnc shelter
c) Traffic rnntrol personnel for drdlmg the bonngs.
d) Dividing the design work mto more than one set of construction documents.
e)
7
Preparabon of maintenance manuals, reports, or certification testing of mstalled
improvements.
Biddmg support services and oonstruct�on phase services
If you find this proposal acceptable, please prepare your standard contract Our receipt of
your contrad or your wntten authorizabon wdl be our notification to proceed. If you have any
questions, please call me at (253) 383-2422.
Smcerely,
C —�. ""� � �t,t�c,..�
Doreen S. Gavm, PE, LEED� AP
Vice President
DSG/Isk
Enclosure
David Nason, AHBL
Dave Follansbee, AHBL
Accounting
Q �2011\211174\Proposals Contracts�Finals\20110518_Pro (RE� 211174 30 11 doa
� �
� � ��
����
�A' iH :B; :L�'�
EXHIBIT A
AHBL Staff Hours per Task
AHBL Project q 21117410
CIVIL ENGINEERING STRUGTURAL ENGINEERING
WorkTask Total Total DG DN 1C LG MS
/f5 SG/LK DB DM EM
TASK 1 PROIECT MANAGEMENT Task Cost (51 Task Hours Prin/PM Team LD QC/ITR PE 2 TECH 3 Ad Asst Pnn PM CAD2
Through Des�gn 0 00
1 1 Manage Schedule, Scope & Budget - 6 hours per month for PM 14 00 12 Z
1 2 Progress Reporting & Invoicing (2hrs/mo @4 mos ) 4 00 4
Total Task 1- Projeet Management hours 18 00 16 00 0 00 0 00 0 00 0 00 2 00 0 00 0 OD 0 00
eilling Rate $150 00/hr 5150 00/hr $150 00/hr 594 DO/hr 5108 00/hr $70 00/hr 5150 00/hr $150 00/hr $80 00/hr
Task Total $ 2,540 00 $ 2 ,aoo 00 $ - S - S - S - S 14D 00 5 - 5 - S -
CIVIL ENGINEERING STRUCTURAL ENGINEERING
WarkTask Total Total DG DN JC LG MS/TS SG/LK DB DM EM
TASK 2 EXISTING CONDRIONS INVENTORY & REPORTS - SURVEY Task Cost ($) Task Hours Prin/PM Team LD qC/ITR PE 2 TECH 3 Ad Asst Prin PM CAD2
2 1 Review As-Bwlts, public records, boundaries & benchmarks 0 00
2 2 Conduct field survey 0 00
2 3 Prepare Topogrephlc Survey drawing 0 00
Total Task 2- Ex�sting Conditions Inventory & Reports - Survey 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 DO 0 DO
Hourly Rate 5150 00/hr $150 00/hr 5150 00/hr 594 00/hr 5108 00/hr $70 00/hr $I50 00/hr 515 00/ 5 00/
Task Total $ - $ - 5 - S - $ - S - S - S - 5 - $ -
CIVIL ENGINEERING STRUCTURAL ENGINEERING
WorkTask Total Totai DG DN 1C LG MS/TS SG/LK DB DM EM
TASK 3 EXISTING SOIL CONDITIONS & REPORTS - GEOTECHNICAL- Perrone Task Cost (S) Task Hours Prin/PM Team LD QC/RR PE 2 TECH 3 Ad Asst Prin PM CAD2
31 Site Exploretions $ 2,95000 000
3 2 Lab Testing for Infiltration rates $ 500 00 0 00
Subtotal Task 3
10% Markup
Total Task 3- Existing Soii Conditions & Reports - Geotechnical
Work Task
TASK4 30%DESIGN
41 TESCP & CSWPPP
4 2 Grading Plans
4 3 Storm Drainage Plans & Report
4 3 Srte layout & dimensioning plans
4 5 Structurel design
4 6 Spec(flcations & Details
4 7 Gost Estimate
4 8 Plan revisions
Total Task 4- 3D4o Deslgn
Haurly Rate
TaskTotal Dlrect labor
$ 6,950 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
S 695 00
S 7,645 00
CIVIL ENGINEERING STRUCTURAI ENGINEERING
ToWI Total DG DN 1[ LG MS/TS SG/LK DB
Task Cost (5) Task Hours Prin/PM Team LD QC/ITR PE 2 TECH 3 Ad Asst Prin/PM PE CAD2
0 00
26 OD 2 16 8
28 00 2 2 i6 8
1600 2 2 8 4
0 00
2 00 2
16 00 2 12 2
0 00
88 00 4 00 B 00 0 00 52 00 22 00 0 00 0 00 2 00 0 00
$150 00/hr $150 00/hr $150 00/hr $94 DO/hr $iD8 00/hr $70 OD/hr $150 DO/hr $150 00/hr $80 00/hr
$ 9,364 00 5 600 00 S 1,200 00 $ - S 4,888 00 S 2,376 00 S - S - 5 300 00 $ -
Q\2011\211174\Proposals_Contracts\Finals\20110518 Work_Task Hour Breakdown_(KiwanisPark)_21117430
EXHIBIT A
AHBL Staff Hours per Task
AHBL Project il 211174 SO
Work Task
5 60% DESIGN - Permit Ready
5 1 Cover
TESCP & CSWPPP & Demalftion
5 2 Grading Plans
5 3 Storm Drainage Plans & Report
Gredtng & Storm Details
5 4 Site layout & dimensioning plans
Site Details, Sections, and Notes
5 5 Structurel design, calcuiations, & detads
5 6 Specifications
5 7 Cost Estimate
5 8 Pian revisions
QC
Total 7ask 5- 60% Design
Hourly Rate
TaskTotal
Work Task
SK 6 90% DESIGN - Address Permit & Owner Comments
6 1 Cover
TESCP & CSWPPP & Demolition plans
TESCP Details
6 2 Grading Pians
6 3 Storm Dreinage Plans & Report
Grading & Stortn Details
6 4 Site layout & dimensioning plans
Site Details, Sections, and Notes
6 5 Structurel design calculations, & details
6 6 Spenfiwtions
6 7 Cost Estimate
6 8 Plan revisions/Owner wmment meeting
QC Backcheck
Totai Task6-90%Design
Hourly Rate
Task ToW I
CIVIL ENGINEERING STRUCTURAL ENGINEERING
Total Totat DG ON JC LG MS/TS SG/LK DB
Task Cost �$) Task Hours Prin/PM Team LD QC/ITR PE 2 TECH 3 Ad Asst Prtn/PM PE CAD2
0 00
16 00 4 12
2 00 2
22 00 2 8 12
22 00 16 6
8 00 2 6
14 00 2 12
12 00 2 4 6
1800 2 8 8
1000 2 S
6 00 2 6
0 00
12 00 12
144 00 2 00 14 00 12 00 42 00 56 00 0 00 2 00 8 DD 8 00
515000/hr $15000/hr $15000/hr 59400/hr $10500/hr $7000/hr $15000/hr $15000/hr $8000/hr
$ 16,336 OD $ 300 00 $ Z,100 00 $ 1,800 00 $ 3,948 00 $ 6,048 00 $ - $ 300 00 $ 1,200 00 S 640 00
CIVIL ENGINEERING STRUCTURAI ENGINEERING
Total Total DG DN 1C LG MS/TS SG/LK DB DM EM
Task Cort �51 Task Hours Prin/PM Team LD QC/ITR PE 2 TECH 3 Ad Asst P�in PM CAD2
0 00
6 00 2 4
0 00
2 00 2
4 00 2 2
0 00
4 00 4
8 00 4 4
26 00 2 8 16
800 2 6
8 00 2 6
4 00 4
8 00 8
78 00 6 00 6 00 S 00 14.00 16 00 0 00 i00 8 00 16 00
5150 00/hr 5150 00/hr 5150 00/hr S94 OD/hr 5108 00/hr 570 00/hr $150 00/hr $150 00/hr 580 00/hr
5 9,124 00 $ 900 00 $ 1,2D0 00 $ 1,200 00 $ 1,316 00 $ 1,728 00 $ - $ 300 00 $ 1,200 00 $ 1,280 00
Q\2011\211174\Proposals_Contracts\Finals\20110518 Work Task Hour_Breakdown_(KiwanisPark�_21117410
EXHIBIT A
AHBL Staff Hours per Task
AHBL Project # 21117410
Work Task
SK 7 100% DESIGN - Advertisement Reac
71 Cover
TESCP & CSWPPP & Demolition plans
TESCP Details
7 2 Grading Plans
7 3 Storm Dreinage Plans & Report
Gradmg & Storm Details
7 4 Site layout & dimensioning plans
Site Details, Sections, and Notes
7 5 Structural design, calculations & details
7 6 Speciflcations
7 7 Cost Estimate
7 6 Plan revisions/Owner comment meeting
QC Backcheck
Total Task7-100%Design
Hourly Rate
Task Total
Civil Engineering
Structurei Engineering
Land Surveying
Geotech
Subtotal
Total Tasks 1-7 (Civil/Structural/Survey/Geotech)
Reimbursabie Expense Atlowance
Grend Total
CIVILENGINEERING STRUCTURALENGINEERING
Total Total DG DN JC LG MS/TS SG/LK DB DM EM
Task Cost (S) Task Hours Prin/PM Team LD QC/RR PE 2 TECH 3 Ad Asst Prin PM CAD2
100 1
100 g
i o0 1
3 DO Z 1
3 00 Z 1
100 1
Z� 1 1
0 00
1600 2 6 g
- 600 2 4
6 00 2 q
4 00 4
6 00 6
SD 00 12 00 6 00 0 00 9 00 7 00 0 00 L00 6 OD 8 00
5150 00/hr $150 00/hr $150 00/hr $94 00/hr $108 00/hr $70 00/hr $150 DO/hr $150 00/hr 580 00/hr
$ 6,142 00 $ 1,800 OD $ 900 00 $ - $ 846 00 $ 756 00 $ - $ 300 00 $ 900 00 $ 640 00
$ 36,q46 00 $ 6,000 00 $ 5,400 00 $ 3,000 00 $ 10,998 OD $ 10,908 00 $ 140 00
$ 7,060 00 $ 900 00 $ 3,600 00 S 2,560 00
$ -
S 7,645 00
$ 51,153 00
$ 50,456 00
S 750 00
$ 51,206 00
Q\2031\211174\Proposals_Contrects\Finals\20110518_Work Task Hour Breakdown_(KlwanisPark) 21117410
AHBL Staff Hours per task
AHBL Pro�ect No 21117411
EXHIBIT A
Work Task Total
EXISTING SOIL CONDITIONS & REPORTS - GEOTECHNICAL- Perrone T ask Co st (S)
2 1 Site Exploretions 5 4,000 00
2 2 Lab Testing for infiltretion reies $ 750 00
2 3 Engineering Analysis -& Report $ 1,100 0
Subtotal Task 2 5 5,850 00
10% Markup $ 585 00
Total Task 2- Existing Soil Conditions & Reports - Geotechnicai S 6,435 00
Work Task
30% DESIGN
� CIVIL ENGINEERING
Total Total DG DN JC RJ LG MS/TS SG/LK
Task Cost ($) Task Hours Prfn/PM Team LD QC/ITR PE 5 PE 2 TECH 3 Ad Asst
3 1 Review City's 30% Plans - 4th Street 1 00 1
Revfew City's 30°,6 Plans - Sth Street 3 00 1 2
Road/Intersection Detads 0 00
3 2 Dreinage Analysfs 10 00 2 8
3 3 Channelization & Signage 0 00
3 4 Troffic Control Plan 0.00
3 5 Speciflcations 0 00
3 6 Cost Estimate 8 00 2 6
3 7 Plan rewsions 0 00
Total Task 3- 3096 Design S - 22 00 2 00 6 00 0 00 0 00 14 00 0 00 0 00
Houriy Rate S150 00/hr 5150 OD/hr S150 00/hr $140 00/hr $94 00/hr 5308 00/ 5 70 0 0/hr
Task Total $ 2,516 00 $ 300 00 $ 900 00 $ - S - $ 1,316 00 $ - S -
Q\2031\211174\Proposals Contrects\Finals\20110518 Work Task Hour Breakdown_(GreenStreeu)_21117411
Through Design D 00
1 1 Manage Schedule, Scope & Budget - 3 hours per month for PM 14 00 12 2
1 2 Progress Reportmg & Invoicing (lhrs/mo @4 mos ) 4 00 4
Total Task i- Project Management hours $ - 18 00 16 00 0 00 0 00 0 00 0 00 0 00 2 00
Billing Rate $150 00/hr $150 00/hr 5150 00/hr 5140 00/hr 594 00/h $ 108 00/ 570 00/hr
Task ToWI S z,sao 0o g z,aoo 00 5 - S - 5 - 5 - S - S iao o0
AHBL Staff Hours per task
AHBL Project No 211174 11
41
42
43
44
45
46
47
Total
Work Task
60� DESIGN - Permit
EXHIBIT A
Total Total DG DN 1C R1 LG MS/TS SG/LK
Task Cost �$) Task Hours Prin/PM Team LD QC/RR PE 5 PE 2 TECH 3 Ad Asst
Roadway Plans - 4th Street 7 0 1 4 2
Roadway Plans - Sth Street 9 0 1 2 4 2
Road/Intersection Detaiis 8 0 8
Drainage Analysis 2 0 2
Channelization & Signage 12 0 4 8
Treffic Control Plan 12 0 4 8
Spectflcations 0 0
Cost Estimate 6 0 2 4
Plan revisfons - meet with owner 4 0 4
Task 4- 60% Design S - 60 0 6 0 6 0 0 0 16 0 4 0 28 0 0 0
Hourly Rate $150 00/hr $150 00/hr 5150 00/hr $140 00/hr $94 00/hr $108 00/hr 570 00/hr
Task Total $ 7,440 00 $ 900 00 S 900 00 S - S 2,240 00 S 376 00 S 3,024 00 $ -
WorkTask Total Total DG DN JC RJ LG MS/TS SG/LK
K 5 90% DESIGN - Address Permit & Owner Comments Task Cost ($) Task Hours Prin/PM Team LD QC/ITR PE 5 PE 2 TECH 3 Ad Asst
5 1 Roadwav Plans - 4th Street 1 00
Roadway Plans - Sth Street 1 00 1
Road/Intersection Detads 2 00 2
5 2 Dramage Analysis 0 00
5 3 Channelizat�on & Signage 2 00 1 1
5 4 Treffic Controi Plan 4 00 2 2
5 5 Spenflcations 4 00 4
5 6 Cost Estimate 2 00 2
5 7 Plan revisions 0 00
5 8 Quality Control Review 6 00 6
Total Task 5- 9096 Design $ - 22 00 0 00 7 00 6 00 0 00 2 00 7 00 0 00
Hourly Rate
Task Total
$150 00/hr 5150 00/hr $150 00/hr 5140 00/hr $94 00/hr $308 00/hr $70 DO/hr
S z ,894 00 S - 5 i,oso 00 5 eoo 00 5 - 5 iss oo S �se oo S -
Q\2011\211174\Proposals Contracts\Finals\20110538 Work Task Hour 8reakdown_�GreenStreets) 21117411
AHBL 5taff Hours per task
AHBL Project No 21117411
Work Task
100'� DE51GN - Advertisement
EXHIBIT A
�
Totai Total DG
Task Cost ($) Task Hours Prin/PM
CIVIL ENGINEERING
Team LD QC/ITR PE 5 PE 2 TECH 3 Ad Asst
61
62
63
64
65
66
67
Total
Roadway Plans - 4th Street 1 00 1
Roadway Plans - Sth Street 100 1
Road/Intersedion Details 1 00 1
Dra�nage Analys�s 0 00
Channelization & Signage 1 00 1
Treffic Control Plan 3 00 2 1
Specifications 0 00
Cost Estimate 100 1
Plan revisions 4 00 4
Task 6-100% Design S - 12 00 4 00 2 00 0 00 0 00 100 5 00 0 00
Hourly Rate
Task Totai
Total Tasks 1-6
Reimbursable Expense Allowance
$150 00/hr $150 00/hr $150 00/hr $140 00/hr $94 00/hr 5108 00/hr 570 00/hr
S i,saa oo $ eoo 0o S 300 00 $ - 5 - S ea oo S sao 00 5 -
S 23,359 00
S 500 00
$ 23,859 00
Q\2011\211174\Proposals Contrects\Finals\20110518 Work Task Hour Breakdown_(GreenStreets) 21117411