HomeMy WebLinkAbout2004 - Tunnel Initiative RESOLUTION NO. 9433
A RESOLUTION of the City Council of the City of
Bremerton, Washington, taking action not to submit to the
qualified electors of the City of Bremerton at the November 2,
2004 General Election, Initiative Petition 101 relating to
construction of a vehicular traffic tunnel as part of the Downtown
PedestnanBTC Access Improvements Project
WHEREAS, an Initiative Petition signed by registered voters, equal in number to
at least twenty -five percent of the total votes cast for all candidates for Mayor at the last
preceding City of Bremerton election, has been filed with the City Clerk as provided for in RCW
35 17 260, and
WHEREAS, the Petition seeks to prohibit the City from constructing a traffic
tunnel as part of the Downtown PedestnanBTC Access Improvements Project ( "Project ")
WHEREAS, the City Clerk, through the Krtsap County Auditor, on July 23, 2004,
venfied the sufficiency of the signatures thereto, and
WHEREAS, RCW 35 17 260 provides for the matter to be presented to the City
Council within 20 days of certification of sufficiency of signatures for either adoption of the
ordinance as proposed or to forward the initiative to election on November 2, 2004, and
WHEREAS, the County Auditor requires a Resolution approved by the City
Council authorizing the placement of the proposition on the November General Election, and
WHEREAS, the State of Washington, in a letter from the Secretary of
Transportation received by the City on July 13, 2004, notified the City that the State is assuming
the Project, and
WHEREAS, because the State has assumed jurisdiction of the Project, the City
Council finds that the subject matter of the initiative petition is not a valid subject pursuant to
Seattle Building and Construction Trades Council v Seattle, 94 Wn 2d 740 (1980), the issue
presented in the initiative petition is now moot, and submitting the initiative to a vote of the
citizens would be confusing in that the voters may think may think they have an impact on the
tunnel decision, and
WHEREAS, the City Council has three options when reviewing the initiative
petition 1) adopt the proposed ordinance, 2) submit the initiative to a vote of the citizens, or 3)
decide not to submit the initiative to a vote of the citizens, and
WHEREAS, because of the above -noted findings, the City Council finds that it
would be inappropriate to submit the Initiative Petition to the voters, NOW THEREFORE
1
Initiative Petition 101
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS
SECTION 1. The recitals set forth above are hereby incorporated as if set forth
herein in full
SECTION2. Initiative Petition 101 shall not be placed on the November
General Election
SECTION 3. SeverabihN If any one or more sections, subsections, or
sentences of this Resolution are held to be unconstitutional or Invalid, such decision shall not
affect the validity of the remaining portion of this Resolution and the same shall remain in full
force and effect
SECTION 4. Effective Date This Resolution shall take effect and be in force
immediately upon its passage
PASSED by the City Council of the City of Bremerton, Washington this
day of 2004
DAREN NYGREN, Counc President
APPROVED AS TO FORM ATTEST
4 ER A L C , rt orn A J ON, City Clerk
r
R TEGAUResolutions \City CouncilUnitiatrve Petition doc
2
Initiative Petition 101
DATE SUBMITTED July 29, 2004 BILL # 0445
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Public Hearing on Resolution Committee Meeting Date July 28 , 2004
No a 13 -3_ regarding the Downtown COUNCIL MEETING Date August 4, 2004
Pedestnan/BTC Access Improvements Department City Attorney's Office
Project- Initiative Petition Presenter Roger A Lubovich
Phone 473 -2345
SUMMARY: Citizen's Initiative 101 was certified by the County Auditors office on July 23, 2004
This initiative petition seeks to prohibit the City from constructing a traffic tunnel as a part of the
Downtown Pedestnan/BTC Access Improvements Project in downtown Bremerton The City Council
has three options with regard to the initiative petition
1) adopt the proposed ordinance as presented in the petition,
2) submit the initiative to a vote of the citizens, or
3) not submit the initiative to a vote of the citizens
It is the City Attorney's recommendation that the initiative petition not be submitted to the voters for
the following reasons
a The subject matter of the initiative petition is not a valid subject pursuant to Seattle Building
and Construction Trades Council v Seattle, 94 Wn 2d 740 (1980),
b The issue presented in the initiative petition is now moot, and
c Submitting the initiative to a vote of the citizens would be confusing in that the voters may
think they have an impact on the tunnel decision
ATTACHMENTS: Proposed Resolution, Initiative 101 Petition, Letter of Certification
FISCAL IMPACTS (Include Budgeted Amount)
APPROVALS:
DEPARTMENT DIRECTOR
CITY ATTORNEY
FINANCE DIRECTOR
MAYOR
FISCALBUDGET Pre-Council 7/28/04
OPERATIONS
Pre-Council 7/28/04 CONSENT AGENDA ❑
COUNCIL PRESIDENT.
RECOMMENDED MOTION:
I move to pass Resolution No electing not to submit the initiative to a vote of the
citizens
COUNCIL ACTION: prove ❑ Deny ❑ Table Continue
❑ ❑ No Action
R TEGAUDepartments- GeneraWity counciffunnel ab doc
INITIATIVE 101
"Citizens Against The Tunnel (GATT)" Wants to Give you the
RIGHT TO VOTE ON A TUNNEL
INITIATIVE PETITION FOR SUBMISSION TO THE CITY COUNCIL OF BREMERTON, WASHINGTON
To the City Clerk of the City of Bremerton Washington We the undersigned registered voters of the City of Bremerton Washington, respectfully direct that this petition and the proposed ordinance contained herein entitled An ordinance prohibiting construction
of a downtown tunnel be enacted into law, and furthermore if the City Council fails to enact this ordinance, that it be submitted to a vote of the people at a regular or special election to be held on a date and in the manner required by the Revised Code of
Washington and each of us for himself or herself says I have personally signed this petition I am a legal voter of the City of Bremerton Washington my residence address is correctly stated and I have knowingly signed this petition only once
Statement of Action Sought
The purpose of this initiative is to prohibit the City of Bremerton from constructing a vehicular traffic tunnel as part of the Downtown Pedestnan/BTC Access Improvements project Such an initiative is authorized by the Bremerton City Charter Section 5 and
Section 36, adopting RCW 35 17 240 through RCW 35 17 360
Text of Ordinance The proposed ordinance reads as follows Ordinance _ (Initiative #101) An ordinance of the City of Bremerton prohibiting construction of a vehicular traffic tunnel as part of the Downtown Pedestrian/BTC Access Improvements
The City of Bremerton Does Ordain Section I The City of Bremerton shall not construct a vehicular traffic tunnel as part of its Downtown Pedestrian/BTC Access Improvements project
Warning Every person who signs this petition with any other than his or her true name, or who knowingly signs more than one of these petitions or signs a petition seeking an election when he or she is not a legal voter, or signs a petition when he or she is
otherwise not qualified to sign, or who makes herein any false statement, shall be guilty of a misdemeanor
CITY OF BREMERTON INITIATIVE TO THE PEOPLE CITY OF BREMERTON VOTERS SIGN BELOW
Petitioner s Residence Address
Petitioner s Signature Date Petitioner's Printed Name Must reside within City limits of Bremerton City or Town Zip Coun
2
3
4
5
6
7
8
9
10
MAIL COMPLETED PETITIONS TO
CITIZENS AGAINST THE TUNNEL (CATT)
PO Box 502, Bremerton, WA 98337
(360) 373 -1594
t
FINANCIAL SERVICES
City Clerk / Paula Johnston
Plohnston@d bremerton waus Tot 360.473 -5323 r " `
, ;`Ae r360-473-5200' "
239 4th Sheet°
Bremerton, WA 96337 +`
August 5, 2004
Karen Flynn
Krtsap County Auditor
614 Division Street, MS -31
Port Orchard, Washington 98366
Dear Ms Flynn
Enclosed for your records is a fully executed copy of Resolution No. 2933 approved by the City
Council on August 4, 2004 This Resolution takes action not to submit Initiative Petition 101
relating to construction of a vehicular traffic tunnel as part of the Downtown PedestnanBTC
Access Improvements Project to the voters at the November 2, 2004 General Election
Sincere' ,
aula Johns n
City Clerk
PJ:ch
enclosure
fl Office of the City Attorney
1 !1 Roger A Lubovich, City Attorney
3
Ali
Memorandum
TO: City Council
From: Roger A Lubovid
Be: Downtown Pedestnanl TC Access pprovements Project — Initiative Petition
Date: August 2, 2004
Facts. On July 12, 2004, the City Clerk received a copy of a citizen's initiative which provides
"The City of Bremerton shall not construct a vehicular traffic tunnel as part of its Downtown
Pedestnan/BTC Access Improvements project" (emphasis added) This initiative petition in
essence seeks to stop construction of a traffic tunnel as a part of the street improvements
proposed for State Route 304 in downtown Bremerton The initiative was certified by the County
Auditors office on July 23, 2004 as having enough signatures to submit to the voters for an
election On July 13, 2004, the City received a letter from Douglas B MacDonald, Secretary of
Transportation, Washington State Department of Transportation informing the City that the State
was assuming jurisdiction over the project
City Council options. The City Council has three options with regard to the presented initiative
petition The City Council may take action to
1) adopt the proposed ordinance as presented in the petition,
2) submit the initiative to a vote of the citizens, or
3) not submit the initiative to a vote of the citizens
Recommendation. I recommend that the City Council vote not to submit the initiative to a vote
of the citizens for the following reasons
a The subject matter of the initiative petition is not a valid subject pursuant to
Seattle Building and Construction Trades Council v Seattle, 94 Wn 2d 740
(1980),
b The issue presented in the initiative petition is now moot, and
c Submitting the initiative to a vote of the citizens would be confusing in that the
voters may think they have an impact on the tunnel decision
Analysis. The primary question raised concerns the fundamental issue of whether this type of
decision, which basically is whether to construct a vehicular traffic tunnel as part of its
downtown street improvement to State Highway 304, is a proper subject for an initiative by the
citizens of Bremerton
Downtown Pedestnan/BTC Access Improvements Project
August 2, 2004
Page 2
My conclusion, after reviewing the relevant cases in this state, is that the decision whether to
construct a tunnel as part of the improvement project is not subject to an initiative by the citizens
of Bremerton since the primary decision - making authority resides with the State Department of
Transportation and not the City Council of the City of Bremerton
The Bremerton City Charter provides for the process of initiative and referendum by the citizens
of the City, which is to be exercised in the manner set forth in RCW 35 17 240 — 35 17 360
Certain procedural requirements must be met, such as obtaining the required number of
signatures on the petition, before an initiative is valid. However, in addition to the procedural
requirements for an initiative petition to be valid, there are two tests that have been created by
the courts in this state and consistently applied to initiative measures to determine if they concern
valid subjects for the exercise of the power of initiative Not all types of city council actions are
subject to the initiative and referendum process I will briefly outline these tests and how they
apply to the facts in this situation
The first test applied by the courts in Washington is whether the underlying council action is
legislative or administrative in nature The power of the people to adopt legislation directly
through the initiative process is limited to actions that are legislative in nature See Ruano v
Spellman, 81 Wn 2d 820 (1973) If an action is deemed to be administrative in nature, then the
decision in not subject to initiative or referendum powers
In this context, an act is characterized as legislative or administrative according to the following
two tests
Actions relating to subjects of a permanent and general character are usually regarded as
legislative, and those providing for subjects of a temporary and special character are
regarded as administrative
In addition, the power to be exercised is legislative in nature if it prescribes a new policy
or plan, whereas it is administrative in nature if it merely pursues a plan already adopted
by the legislative body itself or some power superior to it Citizens for Financially
Responsible Government v Spokane, 99 Wn 2d 339 (1983)
Applying these tests to the facts in this situation, a decision concerning whether to construct the
street improvement project to SR 304 by means of a tunnel is not a legislative decision of the city
council The street improvement is an action that will be of a permanent and general character,
however, the decision to construct a major street improvement to SR 304 in downtown
Bremerton by means of a vehicular traffic tunnel merely pursues a plan already adopted by some
power superior to it, in this case, the State
The key decisions relating to this project are no longer subject to the control of the City Council
This is true for the underlying decision whether to pursue the project at all and also for the
decision whether the project should be completed by means of a vehicular traffic tunnel or a
surface street These key decisions are not being made by the City but rather by the State
Downtown Pedestnan/BTC Access Improvements Project
August 2, 2004
Page 3
One earlier Washington court case that needs to be considered in this analysis is Seattle Building
and Construction Trades Council v Seattle, 94 Wn 2d 740 (1980) In that case, an initiative was
proposed by citizens in Seattle to withdraw the city's participation in a limited access highway
project (an improvement to a portion of Interstate 90) The initiative was challenged as being
beyond the powers of the initiative process The Washington Supreme Court applied the tests
outlined above and concluded that the initiative process did not apply because the actions
remaining to the City of Seattle were administrative in nature and thus not subject to a citizen's
initiative
The conclusion in the Seattle Building Council case is applicable to the situation in Bremerton
The court emphasized in that case that the highway being constructed was a limited access
facility governed by the procedures in Ch 47 52 RCW As a limited access facility, the state had
full jurisdiction, responsibility and control over it While Seattle had a voice in determining the
type of facility to be constructed, its participation was limited to the role provided in Ch 47 52
RCW If the city disapproved of the plan proposed by the state highway department, it could
only file that disapproval in writing with the state Secretary of Transportation and request a
hearing before a board of review After a hearing before the board, the board makes the final and
binding decision, subject to revision only by stipulation of the parties
The court concluded the role of Seattle in the Interstate 90 improvement project was merely
adrrunistrative in nature The city had no authority to act in a legislative capacity in regard to the
location and construction of the limited access facility The city could not ban construction of
the facility nor refuse to cooperate in construction once the plan had been adopted The key
decisions regarding the project were made by the state
In Bremerton, although the portion of the street project under consideration is not a limited
access facility, the result is the same in that the decision whether to proceed with construction of
the project rests with the State, not the City Council. The decision whether to construct a traffic
tunnel as the means of accomplishing the project also rests with the State So in my opinion, the
key facts in the Seattle Building Council case are similar to the facts in Bremerton and it seems
likely that the court would reach the same conclusion
The second court- created test that must be applied to determine if an action of a city council is
subject to the initiative process is whether the underlying grant of authority by the state
legislature in regard to the action being taken is to the city as a corporate entity or to its
legislative authority (which is the city council for cities) See Lince v Bremerton, 25 Wn App
309 (1980), and Leornard v Bothell, 87 Wn 2d 847 (1992)
If the grant of authority is to the city as a corporate entity, direct legislation by the people in the
form of initiative or referendum is permissible If the grant of power is to the legislative
authority of the city, then initiative and referendum is prohibited
Downtown Pedestnan/BTC Access Improvements Project
August 2, 2004
Page 4
When applying this test, it is necessary to determine the statutory grant of authority underlying
the action involved The primary statute applicable to this situation appears to be RCW
35 22 280, which contains a list of powers granted to first class cities such as Bremerton. The
statute provides,
Any city of the first class shall have power .
(7) To lay out, establish, open, alter, widen, extend, grade, pave, plank, establish
grades, or otherwise improve streets, alleys, avenues, sidewalks, wharves, parks,
and other public grounds
(12) To construct and keep in repair bridges, viaducts, and tunnels, and the
regulate the use thereof,
Because this statute does not reference the city council, the primary grant of authority by the
state legislature to construct and improve streets and construct tunnels is to the city as a corporate
entity This leads to the conclusion that this action under this test is subject to the citizen
initiative process
After reviewing the two tests applied by courts in this state to determine if an action by the City
Council is subject to the initiative process, it appears that the proposed subject of the initiative,
which prohibits the City from constructing a vehicular traffic tunnel as a part of the
improvements to SR 304, is not valid for the initiative process in Bremerton because the decision
of the City Council is administrative in nature pursuant to Seattle Building Council
City Council Action. A decision must be made by the City Council when an initiative measure
is successfully submitted by the citizens As noted above, the City Council has three options
when reviewing the initiative petition 1) adopt the proposed ordinance, 2) submit the initiative
to a vote of the citizens, or 3) decide not to submit the initiative to a vote of the citizens The City
Council is directed by RCW 35 17 260, after receiving a valid initiative, to either pass the
proposed ordinance within twenty days or cause an election to be held on the next appropriate
election date and submit the initiative to a vote of the citizens of the City
However, in view of the tests outlined above, the initiative proposed is not a proper subject for
an initiative As noted above, this is because the subject of the initiative relates to an
administrative action Some city councils have refused to submit an initiative measure to the
voters because they have deemed it to involve an issue that is not properly subject to the
initiative process
The courts in this state have reviewed initiative measures before they are submitted to the
electorate for a vote in order to make the determination of whether the proposed law is beyond
the scope of the initiative process Seattle Building Trades Council v Seattle, 94 Wn 2d 740
(1980) The courts will apply the tests outlined above and make this determination
Downtown Pedestnan/BTC Access Improvements Project
August 2, 2004
Page 5
The state statutes that govern the initiative process for the City of Bremerton also provide a
reference to submitting a proposed initiative to the courts It provides in RCW 35 17 290 that if
the clerk finds the petition insufficient, or if the city council refuses either to pass the initiative or
order an election, then any taxpayer may commence an action in superior court in order to obtain
a decree ordering an election to be held
Additionally, because of the action by the State to take over the project, the subject matter to be
voted on by the citizens is moot Any vote against the tunnel project will have no impact on the
State's action relating to the same since the State is the decision maker A vote by the citizens on
the initiative may cause confusion in that the voters may believe their vote will have an impact
on the project when in fact it will not
Conclusion. Because the proposed subject of the initiative, which prohibits the City from
constructing a vehicular traffic tunnel as a part of the improvements to SR 304, is not valid for
the initiative process because the decision of the City Council is administrative in nature
pursuant to Seattle Building Council, it is my recommendation that the City Council vote to not
submit the initiative to a vote of the citizens
07/23/2004 15 58 FAX 360 337 5769 KITSAP COUNTY ELECTIONS 002
r
4 Karen Flynn
Kitsap County Auditor - Elections &Voter Registration
SHIpGifl 1026 Sidney Avenue, Suite 175 + Port Orchard, Washington 98366 -4678
Telephone (360) 337 -7128 • Facsimile (360) 337 -5769
Add Ariwoola
Financial Services Managar
Winne Flores -Logan
Chief Deputy Auditor
CERTIFICATE OF SUFFICIENCY
I hereby certify, In accordance with RCW 35.17.260, that the Petition
Initiative 101 from the City of Bremerton, Washington (Citizens Against The
Tunnel), was signed by at least twenty -five percent (2,060 of 8,238) of the votes
cast for all candidates for mayor at the last general election at the last preceding
general election.
WITNESS my hand and official seal of office affixed
this 23" day of July 2004.
4
KAREN F I ; • f ' " FL r
Kltsap County Auditor f'
Administration Accounts payable Payroll Vehmla Licensing Public Records
(360) 337 -7129 (300) 337.7122 (360 ) 33 - 1.7125
(360) 337-4440 (360) 3374935
Fax 337--"45 Fax 3377016 Fax 337-7010 Fax-337-4645 Fax 337.4645
Toll Free from Olalla 559 -4147 • Bainbridge Island 842 -2051
v7P Washington State Transportation Building
Department of 'Transportation 310 Maple Park Avenue S E
Douglas B. MacDonald P O Box 47300
Secretary of Transportation Olympia, WA 98504 -7300
360 - 705 -7000
TTY 1 -800- 833 -6388
July 13, 2004 www wsdot wa gov
The Honorable Cary Bozeman
Mayor, City of Bremerton
Councilman Daren Nygren,
Council President, City of Bremerton
239 Fourth Street
Bremerton WA 98337
Re Downtown Bremerton Pedestnan/BTC Access
Improvement Project
Dear Mayor Bozeman and Councilman Nygren
I write today regarding the Downtown Bremerton PedestnanBTC Access Improvement Project
on State Route 304 I understand that the draft Environmental Assessment stage of this project
should be completed shortly
As we move from the draft Environmental Assessment to the final Environmental Assessment,
WSDOT must step forward to fulfill its statutory responsibilities for management of this state
highway protect
State law requires WSDOT to "exercise all the powers and perform all the duties necessary,
convenient, or incidental to the planning, locating, designing, constructing, improving,
repairing, operating, and maintaining [ofJ state highways" (See RCW 47 01 260 )
We are prepared to handle the complex scope issues and public involvement question required
of such a project The Environmental Assessment may raise many issues that will have to be
addressed with the community before the project could proceed
WSDOT looks forward to continuing to work with the City of Bremerton Randy Hain,
WSDOT's Olympic Region Administrator, can be reached via telephone at (360) 357 -2605 with
any questions
Sincerely, r
Douglas B TVIacDonald
Secretary of Transportation
DBM iaa
cc Randy Hain, WSDOT, 47440
Larry Ehl, WSDOT, 47322
1
2 RECEIVED FOR 3-ILING
KITSAP COUNTY CLERK
4 C)AVIU VV PETERSON
KITSAP COUNTY CLERK
5
6
7
8 IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON IN AND FOR
9 KITSAP COUNTY, WASHINGTON
10
11 DELL KNAUSS, Case No. 04 -2- 02001 -0
Petitioner,
v
12 ORDER DENYING PETITION
FOR WRIT OF MANDATE
13 THE CITY OF BREMERTON and CITY
14 COUNCIL OF BREMERTON,
Respondents
15
16 THIS MATTER came before the Court on a Petition for Writ of Mandate
17 The Court considered the following pleadings and evidence:
18 1 Petition for Writ of Mandate,
19 2 Respondents Answer and Affirmative Defenses to Petition for Writ of Mandate,
3 City of Bremerton's Opposition to Petition for Writ of Mandate,
20
4 Declaration of Randall A Hain, P E, WSDOT,
21 5 Declaration of David P Horton with attachments, and
22 6 Petitioner's Memorandum of Law
23
24
Based on the argument of counsel and the pleadings and evidence presented, the
25
Court finds
1 The ordinance proposed by the initiative seeks to stop'the constructi"t a state
26 highway
ORDER DENYING PETITION FOR ROGER A LUBOVICH
BREMERTON CITY ATTORNEY
WRIT OF MANDATE - 1 ')7Q arh 'Zt-,
r,
4
t
1 2 The Department of Transportation has plenary authority over construction and design
2 of state highways
3 3 The subject matter of the petition is administrative, not legislative
4
4
7 Based on the above findings, it is ORDERED that the Petition for Writ of Mandate
7 filed by Dell Knauss is DENIED '
g DONE IN OPEN COURT this 2 ' ® Y August, da of 2004
9
10 JUDGE CRADDOCK D VERSER
11
12
13 Presented by
ROGER A LUBOVICH
14 Bremerton City Attorne
1
15
By ista
16 Davi Orton, ssnt City Attorney
17 W A #27123
Attorneys for Respondents
18
19 Approved as to Form
20
21 5
22 Walter M Hackett, Jr
WSBA #1055
23 Attorney for Petitioner
24
25
26
ORDER DENYING PETITION FOR ROGER A LUBOVICH
WRIT OF MANDATE - 2 BREMERTON CITY ATTORNEY
RECENED
Aug
srnrga cj'1 of Y�I tOr Gl1
W sapf Washington COY ��',
County of K t
No
(Plaintiff /Petitioner, )
ASSIGNMENT OF TRIAL DATE
vs AND STATEMENT OF ARBITRABILITY
(ASTD)
(Defendant/Respondent
This case shall be heard on the following date(s)
❑ TRIAL &TOTHER r `
-Date
-Time - Date
V ## Y
- Trial Length - Time
A
- ❑ Jury - ❑ fi.�- Nonjury � y _Length
Nature of Case '")
c_
NOTE IF YOUR CASE IS PUT ON STANDBY, YOU WILL BE. REQUIRED TO BE IN COURT ON TWO HOURS NOTICE
COUNSEL ARE REQUIRED TO BE PRESENT IN THE TRIAL COURTROOM AT 8 45 A M ON THE FIRST DAY OF TRIAL
INITIAL STATEMENT OF ARBITRABILITY (LMAR 2 1)
❑ This case is subject to arbitration because the sole relief sought is a money judgment and involves no claim in
excess of $35,000 exclusive of attorney fees, interest and costs (MAR 1 2)
❑ This case is not subject to mandatory arbitration because
❑ Plaintiffs claim exceeds $35,000
❑ Plaintiff seeks relief other than a money judgment
❑ Defendant's counter or cross claim exceeds $35,000
❑ Defendant's counter or cross claim seeks relief other than a money judgment
❑ Counsel agree that the claim exceeds $35,000 but hereby waive any claim in excess of $35,000 for purpose of
arbitration (MAR 1 2)
IF A SETTLEMENT CONFERENCE IS HELD, ALL PARTIES MUST BE PREPARED TO SERIOUSLY NEGOTIATE
SETTLEMENT
Dated
J D 4GOMM{ -SIONER /SCHEDULER
Court File (White) >� ,� A t CUSTODY CASES Has GAL, attorney for
cc PI /Pet Atty (Yellow) ; f _,, )` child, or Investigative Officer been appointed
pursuant to LCR 20(1)?
Def /Res Atty (Pink) (- ._ _ _ ❑ Yes ❑ No
(Goldenrod)
Court Scheduler (Green) (Name of Guardian ad L/tem)
ASSIGNMENT OF TRIAL DATE AND STATEMENT OF ARBITRABILITY (5/00)
G \SCRl of Trial Date and Statement of Arbitrabihty cjoc
kA
IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON
1 FOR KITSAP COUNTY
2
DELL KNAUSS, )
3 ) NO 04- 2- 02001 -0
4 Petitioner, ) tof t Ii (OL)( `S
P£:I$N MEMORANDUM
5 v ) OF LAW
6 THE CITY OF )
OF BREMERTON and ) ��
7 CITY COUNCIL OF
BREMERTON,
8 � AUG d 7
9 Respondents ) ��
J �
11 I
12 FACTS
13 This case concerns the refusal of the legislative body of the City of
14 Bremerton to place on the ballot for the November, 2004, General Election
15 Initiative 101 which provided in part "the City of Bremerton shall not construct a
16 vehicular traffic tunnel as part of the downtown Pedestrian/BTC Access
17
Improvements Project"
18
19 The proposed ordinance was filed with the City of Bremerton on July 12,
20 2004 and was certified as having the proper number of signatures on July23,
21 2004
22 The City Council considered the initiative but did not enact it into law
23 and for the following reasons refused to place it on the ballot, that the subject
24 matter of the initiative is not a valid subject, the issue presented is moot, and
25
26
27 PETITION MEMORANDUM
OF LAW - 1
28
a
submission to a vote of the citizens would be confusing in that the voters may
1 think they have an impact on the tunnel decision (Exhibit 1 )
2
3 The Petitioner a resident and voter who had signed the Petition to the City
4 Council asks this Court to issue a Writ of Mandate directing the Council to place
5 the matter on the general election ballot
6 II
LAW
7
8 As a general proposition, initiative measures may only be barred from the
9 ballot before a vote is taken if the} are not proper subjects of legislation For
10 example in Leonard v Bothell, 87 WN 2d 847, 557 p 2nd 1306 (197), the
11 Supreme Court held that a rezone was an administrative matter and not a proper
12 legislative matter In Ruano v SpgIlman 81 WN 2d 820 505, p 2d 447 (1973),
13
the Supreme Court held that a public improvement could not be halted where it
14
15 would impair the County's obligation on bonds, finally in the case of Seattle
16 Building and Construction Trades Council v Seattle, 94 WN 2d 740 (1980), it
17 was held an initiative could not block a limited access state highway to be
18 constructed under RCW 47 52 through one of the participating municipalities
19 In rejecting the proposed initiative the City relied on a letter dated July
20 13, 2004, from the Secretary f Transportation, supposedly ry po taking over the
21
project
22
23 We believe a project take -over a this point is not proper since it is a
24 proposed improvement by the State which was not approved by the
25 Transportation Commission as required by RCW 47 01 280
26
2 ,, PETITION MEMORANDUM
OFLAW -2
28
V
The reality of the situation is that this has been a City project improving
1 City traffic flow over streets that are designated as a State highway The City
2
executed a local agency agreement with the State to receive federal funds but all
3
4 the planning and engineering studies up to this point have been paid for by the
5 City of Bremerton (Exhibit 3)
6 In this case, the proposed improvement has not been validly assumed by
7 the State No construction contracts have been let or bonds issued Moreover,
8 this is not a Limited Access Highway Project under RCW 47 52
9 III
10
11 Because Citizens' Initiative 101 is a proper subject of legislation, it should be
12 placed on the general election ballot for November, 2004
13 Respectfully submitted,
14
15 N�V-OAI
16 WALTER M HACKETT, JR
Attorney for Petitioner
17 WSBA 91055
18
19
20
21
22
23
24
LAW OFFICES OF
25 WALTER M. HACKETT, JR.
423 Pacific Avenue, #202
26 Bremerton, WA 98337
PETITION MEMORANDUM ( 360) 377 -4481
27 OF LAW - 3
28
J 30 04 01 lUr
p.3
RESOLUTION NO 8 33 _
A RESOLUTION of the City Council of the City of
Bremerton, Washington, taking action not to submit to the
qualified electors of the City of Brem, ertor at the November 2,
2004 General Election, Initiative Petition 101 relatin; to
construction of a vehicuiaz traffic ttuuiel as part of the Dowaito,tin
Pedestnan/BTC Access Imp-o ern r Project
WHEREAS, an Initiative Petition signed by registered voters, equal in number to
at least twenty -five percent of the total votes cast for all candidates for Mayor at the las
preceding City of Bremerton election, has been filed with the City Clerk as provided for in RCti�'
35 17 26D, and
WHEREAS, the Petition seeks to prohinit the City born constntcting a traffic
tunnel as pact of the Downtoi&m Pedestnan,BTC Access Improvements Project ( "Project ")
WHEREAS, the City Clerk, through the Kitsap County Auditor, on July 23, 2004
verified the sufficiency of the signatures thereto, and
Wif)'REAS, RM 35.17 260 proti ides for the matter to be presented to the City
Council withui 20 days of certification of sufficiency of signatuies for either adoption of the
ordinance as proposed or to foru.,rd the itutiatrvt to election on Noti ernbcr 2, 2004, and
WHEREAS the Count} Auditor requires a Resolution apl:roved by the City
Council authoitzing the ptaeement of the proposition on the Notiernbet Gem r211✓lecttori, and
WHEREAS, the State of Washington in a letter front t],e Secretary of
Transportation received by the City on July 13, 2 notified the City that the State is assurning
the Project, and
WHEREAS because the State has assumed junsdtetion of the Project, the City
Council finds that the subject matter of the initiativ a petition is not a Lalid subject pursuant to
Seattle6 and Conshuction Trades Council v Seattle, 94 Wn 2d 740 (1980) the issue
presented in the initiative petition is now moot, and submitting the initiatne to a vote of the
citizens would be confusing in that the , ottrs inay think may think they have an inipact on the
tunnei decision, and
WHEREAS, the ON Council has three options „hen reviewing the initiative
petition 1) adopt the proposed ordinance, 2) submit the initiative to a vote of the ci'izens, of 39
dcctde not to submit the irutialrvE. to a vote of the citlzen,, arid
WHEREAS, because of the above -noted findings, the City Council finds that it
�%ould be inappropriate to submit the butiah ►e Petition to the voters, NOt� THEREFORE
2
Initianve Petition 101
jui a0 04 a1:1tp
p.4
THE CITY COUNCIL OF THE CITY OF BR1r1,1ERTOV, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS
SECT - 101V 1 The rentals set forth above are hereby Incorporated as if set fore
herein zn full
SECTI0IV ?. Inrtian petition 101 shall not be placed on the i
Gencial Electron
'L''CTI N 3. Severabdin If any one or more sections, subsections, or
scnterces of this Resolution are held to be unconstitutional or mn alid such decision 5hall not
affect the validity of the remaining portion of this Resolution and the same shall remairi iti full
force and effect
SECTION 4 E e ttrve.Dat Tl
e us l:Fsolutioa shall tale effect and be in :otce
immediately upon its passage ,
PASSED by the City Council of the City of 13remerton, Washington this
day of _ _ , 200.3 --
Council Prc sident
APPROVED AS TO FORM AT I F,S I'
ROGEK A LU>30VICH, City .Att<imey ` PAULA JOHNSTON, t'ity Clerk
F \r�C 4 LResowtorsGiry Qc�cdJvnaave Pei n �� doe
2
IniliativePetruvn 101
4P Washington State Local Agency Agreerner
Department of Transportation
Agency City of Bremerton CFDA No 20 205
(Catalog of Federal Domestic Ass,stance)
ddress 3027 Olympus Drive Project No H U EI (6 QZ-9
Bremerton, WA 98310 5 %
Agreement No
For OSC WSDOT Use Only
The Local Agency having complied, or hereby agreeing to comply, with the terns and conditions set forth in (1) Title 23, U S Code Highways, (2) the regulations issue
pursuant thereto, (3) Office of Management and Budget Circulars A 102 A -87 ai d � 33 i t) t po+icies and procedures promulgated by the Washington State
Department of Transportation and (5) the federal aid project agreement enterLd;trlto tjetw4ti thl~Staib and Federal Government relative to the above project, the
Washington State Department of Transportation will authorize the Local Ager1cY 1'orpr6ceed on tfie project by a separate notification Federal funds which are to be
obligated for the project may not exceed the amount shown herein on line r, column 3 without wntten authority by the State, subject to the approval of the Federal
Highway Administration All project costs not reimbursed by the Federal Goveilijment sha g
a tt2 r9ponsibility of the Local Agency
Project Description ;
Name Downtown Pedestnan/BTC Access Improvement f ` - Length 0 53 miles
Termini Warren Ave fir. Burwell Swe Intersec to Breme F erry Te rminal
Description of Work
The project consists of improvements for pedestrian and vehicular access, within the downtown Bremerton core, to the
Bremerton Transportation Center (BTC) at the ferry terminal The project includes a potential ferry exit tunnel, roadway
reconstruction and realignment, transit enhancements, channelization, signalization, sidewalk and streetscape
improvements, illumination, landscaping and drainage improvements
Estimate of Funding
Type of Work (�) ( (3)
Estimated Total Estimated Agency Estimated
_ Project Funds Funds Federal Funds
B a Ag ency 500,000 00 100,000 00 400,0
80 % b Other Consultants 3,100,000 00 620,000 00 2,480,0000
c O ther
Federal Aid
Participation of State 150,000 00 30,000 00 120,000 Oi
Ratio for PE a Total PE Cost Estimate a +b +c +d 3,750,000 00 750,000 00 3,000,000 01
Right of Way f Agenc
Other
h Other
Federal Aid I State
Participation
Ratio for RW I Total R/W Cost Estimate f+ +h +i
Construction k Contract
I Other
m Other
n Other
o Agenc
Federal Aid
Participation State
Ratio for CN q Total CN Cost Estimate (k +l +rim +n lo+ )
r Total Project Cost Estimate (e +j +y) 3,750,000 001 750,000001 3,000,000 0(
Agency Official Washington State Department of Transportation
By By
'tie C ary B ozeman istant Secretar/ for Highways and Local Programs
APR 14 2003
Maynr, (^tty of Bremerton Date Executed
DOT Form 140 -039 EF 1
Revised 10/01
i
Construction Method of Financing (Check Method Selected)
— State Ad and Award
❑ Method A - Advance Payment - Agency Share of total construction cost (based on contract award)
❑ Method B - Withhold from gas tax the Agency's share of total construction cost (line d, column 2) In the amount or
$ at $ per month for months
i_ocal Force or Local Ad and Award
® Method C - Agency cost incurred with partial reimbursement
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a
condition to payment of the federal funds obligated, it accepts and will comply with the applicable provisions set forth
below Adopted by official action on
NA Resolution /Ordinance No
Provisions
I Scope of Work I Preliminary engineering
The Agency shall provide all the work labor rfatenals and services necessary 2 Right of way acquisition
to perform the project which is described and set forth in detail in the ` Project 3 Project c. nst -uct on
Description' and Type of Work
In the event that right of way acquisition or actual construction of the road, for
When the State acts for and on behalf of the Agency, the State shall be deemed which preliminary engineenng is undertaken as not started by the closing of the tenth
an agent of the Agency and shall perform the services described and indicated in fiscal year following the fiscal year in which the agreement is executed, the Agency
Type of Work on the face of this agreement, in accordance with plans and will repay to the State the sum or sums of federal funds paid to the Agency under the
specifications as proposed by the Agency and approved by the State and the terms of this agreement (see Section Dn
Federal Highway Administration
The Agency agrees that all stages of construction necessary to provide the initially
When the State acts for the Agency but is not subject to the nght of control by planned complete facility within the limits of this project will conform to at least the
the Agency, the State shall have the right to perform the work subject to the min irnum values set by approved statewide design standards applicable to this class
ordinary procedures of the State and Federal Highway Administration of highways, even though such additional work is financed without federal aid
11 Delegation of Authority participation
The State is willing to fulfill the responsibilities to the Federal Government by The Agency agrees that on federal aid highway construction projects, the current
administration of this project The Agency agrees that the State shall have the federal aid regulations which apply to liquidated damages relative to the basis of
I authority to cant' out this administration The State shall review process, and federal participation in the project cost shall be applicable in the event the contractor
approve documents required for federal aid reimbursement in accordance with fails to complete the contract within the contract time
federal requirements If the State advertises and awards the contract, the State VI. Payment and Partial Reimbursement
will further act for the Agency in all matters conceming the project as requested
by the Agency if the Local Agency advertises and awards the project, the State The total cost of the project, including all review and engineering costs and
shall review the work to ensure conformity with the approved plans and othLr expenses of the State, is to be paid by the Agency and by the Federal
specifications Government Federal funding shall be in accordance with the Transportation
Equity Act for the 21st Century (TEA 21) as amended, and Office of
III Project Administration Management and Budget circulars A -102, A -87 and A -133 The State shall not
Certain types of work and services shall be provided by the State on this be ultimately responsible for any of the costs of the project The Agency shall be
project as requested by the Agency and described in the Type of Work above In ultimately responsible for all costs associated with the project which are not
addition, the State will famish qualified persornel for the supervision and reimbursed by the Federal Government Nothing in this agreement shall be
inspection of the work in progress On Local Agency advertised and awarded construed as a promise by the State as to the amount or nature of federal
projects the :;uoervision and inspection shall be limited to ensunng all work is in par cipation in this project
conformance with approved plans, specifications, and federal aid requirements The Agency shall bill the state for federal aid project costs incurred in conformity
The salary of such engineer or other supervisor and all other salanes and costs with applicable federal and srite laws The --gercy shall mimimize the time elapsed
incurred by State forces upon the project will be considered a cost thereof All between receipt of federal aid funds and subsequent payment of incurred costs
costs related to this project incurred by employees of the State in the customary Expenditures by the Local Agency for maintenance general administration,
manner on highway payrolls and vouchers shall be cna -o,.d as costs of the si, ,Dervision, and other overhead shall not be eligible for federal participation unless
project an indirect cost plan has been approved by WSDOT
IV Availability of Records The State will pay for State incurred costs on the project Following
All project records in support of all costs incurred and actual expenditures payment, the State shall bill the Federal Govemment for reimbursement of
kept by the Agency are to be maintained in accordance with local govemment those costs eligible for federal participation to the extent that such costs are
accounting procedures prescribed by the Washington State Auditor's Office, attributable and properly allocable to this project The State shall bill the
the U S Department of Transportation, and the Washington State Department Agency for that portion of State costs which were not reimbursed by the
of Transportation The records shall be open to inspection by the State and Federal Govemment (see Section DC)
Federal Govemment at all reasonable times and shall be retained and made 1 Project Construction Costs
available for such inspection for a period of not less than three years from the
final payment of any federal aid funds to the Agency Copies of said records Project construction financing will be accomplished by one of the three
shall be fumished to the State and/or Federal Government upon request m ethods as indicated in this agreement
V Compliance with Provisions
The Agency shall not incur any federal aid participation costs on any
classification of work on this project until authorized in writing by the State for
each classification The classifications of work for projects are
DOT Form 140 -039 EF 2
Revised 10101
Method A — The Agency will place with the State, within (20) days after the X Traffic Control, Signing, Marking, and Roadway
execution of the construction contract, an advance in the amount of the Maintenance
P �e -icy's shat e of the total construction cost based on the contract award The
Sta e will notify the Agency of the exact amount to be deposited with the State The Agency will not permit any changes to be made in the provisions for park
S *:te will pay all costs incurred under the contract upon presentation of regulations and traffic control on this project without prior approval of the State a
gress billings from the contractor Following such payments, the State will Federal Highway Administration The Agency will not install or permit to be
submit a billing to the Federal Government for the federal aid participation installed any signs signals, or markings not in conformance wnti" Lhe standards
share of the cost When the project is substantially completed and final actual approved by the Federal Highway Administration and MUTCD The Agencywil
costs of the project can be determined, the State will present the Agency with a at its own exoe ise, maintain the ,morovement covered by this ar cement
final billing showing the amount due the State or the amount due the Agency
This billing will be cleared by either a payment from the Agency to the State or XI Indemnity
by a refund from the State to the Agency
The Agency shall hold the Federal Government and the State harmless from an
shall process and defend at its own expense all claims, demands, or suits, whether
Method B — The Agency's share of the total construction cost as shown on l or equity brought against the Agency, State, or Federal Government, arising
the face of this agreement shall be withheld from its monthly fuel tax from the Agency s execution, performance, or failure to perform anj of the
allotments The face of this agreement establishes the months to which the provisions of this agreement, or of any other agreement or contract connected witl
withholding shall take place and the exact amount to be withheld each month this agreement, or arising by reason of the participation of the State or Federal
The extent of withholding will be confirmed by letter from the State at the time Government in the project, PROVIDED, nothing herein shall require the Agency
of contract award Upon receipt of progress billings from the contractor, the reimburse the State or the Federal Government for damages arising out of bodily
State will submit such billings to the Federal Government For payment of its injury to persons or damage to property caused by or resulting from the sole
participating portion of such billings negligence of the Federal Government or the State
No liability shall attach to the State or Federal Government except as expressly
Method C — The Agency may submit vouchers to the State in the format provided herein
prescribed by the State, in duplicate, not mo .han once per month for th ^Ee
costs eligible for Federal panic pat,on to he extent that such toss are directly XII Nondiscrimination Provision
attributable and properly allocable to this project Expenditures by Local The Agency shall not discriminate on the basis of race, color, national ongm, or
Agency for maintenance, general administration, supervision, and other sex in the award and performance of any USDOT- assisted contract and/or
overhead shall not be eligible for Federal participation unless claimed under a agreement or in the administration of its DBE program or the requirements of 49
previously approved indirect cost plan CFR Part 26 The Agency shall take all necessary and reasonable steps under 49
The State shall reimburse the Agency for the Federal share of eligible project CFR Part 26 to ensure nondiscrimination in the award and administration of
costs up to the amount showr on the face of this agreement At the time of USDOT - assisted contracts and agreements The WSDOT's DBE program, as
audit, the Agency will provide documentation of all costs incurred on the required by 49 CFR Part 26 and as approved by USDOT, is incorporated by
reference in this agreement Implementation of this program is a legal obligation
project and failure to carry out its terms shall be treated as a violation of this agreement
The State shall bill the Agency for all costs incurred by the State relative to Upon notification to the Agency of its failure to carry out its approved program, th
the project The State shall also bJI the Agency for the federal funds paid by Department may impose sanctions as provided for under Part 26 and may, in
the State to the Agency for project costs which are subsequently determined to appropriate cases, refer the matter for enforcement under 18 U S C 1001 and/or tl
ineligible for federal participation (see Section DQ Program Fraud Civil Remedies Act of 1986 (31 U S C 3801 et seq )
Jll Audit of Federal Consultant Contracts
The Agency if services of a consultant are required, shall be responsible for The Agency hereby agrees that it will incorporate or cause to be incorporated in
audit of the consultant's records to determine eligible federal aid costs on the any contract for construction work, or modification thereof, as defined in the rules
project The report of said audit shall be in the Agency's files and made and regulations of the Secretary of Labor in 41 CFR Chapter 60, which is paid for
available to the State and the Federal Government whole or in part with funds obtained from the Federal Government or borrowed or
the credit of the Federal Government pursuant to a grant, contract, loan, insurance
An audit shall be conducted by the WSDOT Internal Audit Office in or guarantee or understanding pursuant to any federal program involving such gal
accordance vith generally accepted governmental auditing standards as contract, loan, insurance, or guarantee, the required contract provisions for
issued by the United States General Accounting Office by the Comptroller Federal -Aid Contracts (FHWA 1273), located in Chapter 44 of the Local Agency
General of the United States, WSDOT Manual M 27 -50, Consultant Guidelines
Authorization, Selection, and Agreement Administration, memoranda of The Agency further agrees that it will be bound by the above equal opportunity
understanding between WSDOT and FHWA, and Office of Management clause with respect to its own employment practices when it panic pa�!; in
and Budget Circular A -133 federally assisted construction work Provided that if the applicant so
If upon audit it is found that overpayment or participation of federal participating is a State or Local Government the above equal opportunity clause
money in ineligible items of cost has occurred, the Agency shall reimburse is not applicable to any agency, instrumentality, or subdivision of such
the State for the amount of sach overpayment or excess part,cipatnon (set go ernment which does not participate in work on or under the contract
Section DC)
VIII Single Audit Act The Agency also agrees
The Agency, as a subrecipient of federal funds, shall adhere to the federal (1) To assist and cooperate actively with the State to obtaining the compliance
Office of Management and Budget (OMB) Circular A -133 as well as all contractors and subcontractors with the equal opportunity clause and rules,
applicable federal and state statutes and regulations A subrecipient who regulations, and relevant orders of the Secretary of Labor
expends $300,000 or more in federal awards from all sources during a given (2) To fumish the State such information as it may require for the supervision
fiscal year shall have a single or program specific audit performed for that such compliance and that it will otherwise assist the State in the discharge of its
year in accordance with the provisions of OMB Circular A -133 Upon
conclusion of the A -133 audit, the Agency shall be responsible for ensuring primary responsibility for securing compliance
that a copy of the report is transmitted promptly to the State (3) To refrain from entering into any contract or contract modification subject
Executive Order 11246 of September 24, 1965, with a contractor debarred from, e
IX Payment of Billing who has not demonstrated eligibility for, government contracts and federally
The Agency agrees that if payment or arrangement for payment of any of assisted construction contracts pursuant to the Executive Order
the State's billing relative to the project (e g , State force work, project
cancellation, overpayment, cost ineligible for federal participation, etc ) is not (4) To carry out such sanctions and penalties for violation of the equal
made to the State within 45 days after the Agency has been billed, the State opportunity clause as may be imposed upon contractors and subcontractors by the
shall effect reimbursement of the total sum due from the regular monthly fuel State Federal Highway Administration or the Secretary of Labor pursuant to Pall
tax allotments to the Agency from the Motor Vehicle Fund No additional II, subpart D of the Executive Order
Federal project funding will be approved until full payment is received unless
otherwise directed the Assistant Secretary for Highways and Local Programs
DOT Form 140 039 EF 3
P,-ri in/m
In addition, the Agency agrees that if it fails or refuses to comply with these XV Venue for Claims and/or Causes of Action
un.ie,iakings, the State may take any or all of the following actions For the convenience of the parties to this contract it is agreed that any claims
(a) Cancel, terminate, or suspend this agreement in whole or in part, and/or causes of action which the Local Agency has against the State of
Washington growing out of this contract or the project with which it is
b) Refrain from extending any further assistance to the Agency under the concerned, shall be brought only in the Superior Court for Thurston County
gram with respect to which the failure or refusal occurred until satisfactory
assurance of future compliance has been received from the Agency, and XVI Certification Regarding the Restrictions of the Use
(c) Refer the case to the Department of Justice for appropriate legal proceedings of Federal Funds for Lobbying
The approving authority certifies, to the best of his or her knowledge and belief
that
XIII Liquidated Damages (1) No federal appropriated funds have been paid or will be paid, by or on beh,
The Agency hereby agrees that the liquidated damages provisions of 23 CFR of the undersigned, to any person for influencing or attempting to influence an
Part 630, Subpart 305, as supplemented, relative to the amount of Federal officer or employee of any federal agency, a member of Congress, an officer or
participation in the project cost, shall be applicable in the event the contractor employee of Congress, or an employee of a member of Congress in connection wi
fails to complete the contract within the contract time Failure to include the awarding of any federal contract the making of any federal grant, the making
liquidated damages provision will not relieve the Agency from reduction of any federal loan, the entering into of any cooperative agreement, and the ertensior
federal participation in accordance with this paragraph continuation, renewal, amendment, or modification of any federal contract, grant,
loan or cooperative agreement
XIV Termination for Public Convenience (2) if any funds other than federal appropriated funds have been paid or will be
The Secretary the Washington State Department of Transportation may paid to any person for influencing or attempting to influence an officer or employe
terminate the contract in whole, or from time to time in part, whenever of any federal agency a member of Congress, an officer or employee of Congress
(1) Tlie requisite federal funding becomes , rsvailable through failure of or an employee of a member of Congress in connection with this federal contract,
appropriation or otherwise &.-ant loan or cooperative affeement ht iindersigned shall complete and submit
(2) The contractor is prevented from proceeding with the work as a direct
the Standard Form - LLL, 'Disclosure Form to Report Lobbying, in accordance
with its instructions
result of an Executive Order of the President with respect to the prosecution of
war or in the interest of national defense, or an Executive Order of the (3) The undersigned shall require that the language of this certification be
President or Governor of the State with respect to the preservation of energy included in the award documents for all subawards at all tiers (including subgrants
resources and contracts and subcontracts under grants, subgrants loans, and cooperative
agreements) which exceed $100,000, and that all such subrecipients shall certify
(3) The contractor is prevented from proceeding with the work by reason of and disclose accordingly
a preliminary, special, or permanent restraining order of a court of competent This certification is a material representation of fact upon which reliance was
jurisdiction where the issuance of such order is primarily caused by the acts or
placed when this transaction was made or entered into Submission of this
omissions of persons or agencies other than the contractor certification as a prerequisite for making or entering into this transaction imposed
by Section 1352, Title 31, U S Code Any person who fails to file the required
(4) The Secretary determines that such termination is in the best interests of cc- tification shall be subject to a civil penalty of not less than $10,000 and not moi
the State than $100,000 for each such failure
Additional Provisions
DOT Form 140 039 EF 4
� ' M � Washington State
®I® Department of Transportation Local Agency Agreement Supplement
Agency Supplement Number
Bremerton o NF
Federal Aid Project Number Agreement Number CFDA No 20.205
HP 1998(029) LA - 5522 (Catalog of Federal Domestic Assistance)
The Local Agency desires to supplement the agreement entered into and executed on April 14, 2003
All provisions in the basic agreement remain in effect except as expressly modified by this supplement
The changes to the agreement are described as follows
Project Description
Name Ferry Tunnel Length 0 53
Termini Warren Ave & Burwell Street Intersection to Bremerton Ferry tunnel
Description of Work ® No Change
Reason for Suaplement
Convert project into Toil Credit Niatch 1, ent
/tJ4G'
Estimate of Funding
T of Work (1) (2) (3) (4) (5)
Ty Previous Supplement Estimated Total Estimated Agency Estimated
Agreement/Suppl 1 Project Funds Funds Federal Funds
PE a A gency I 500,000 00 0 00 500,000 00 000 500,000 00
100 % b_Other Consultant 3,100,000 00 E � 8 25.6 92 '^ °
0 1 -9 000 3 �-m - -�
o� Sic c�1
c Other �y
Federal Aid d State 150,000 00 0 00 150,000 00 000 150,000 00
Participation
Ratio for PE e Total PE Cost Estimate (a +b +c +d) 3,750,000 00 --&25,492-N 4, .00
Right of Way f Agency
I
g Other
Federal Aid h Other
Participation
Ratio for RW i State
j Total R/W Cost Estimate (f +g +h +i)
Construction k Contract
m Other
n Other
o Agency
Federal Aid
Participation p State
Ratio for CN q Total CN Cost Estimate k+t+m+n+o+p
r Total Project Cost Estimate (e+l+q) 3,750,000 00
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition
to payment of the Federal fu I it accepts and will comply with the applicable provisions
Agenc tcl ashtngton State partment of
By By
Title Cagr Bazeman Assistant Secretary for Highways and Local Programs
Mayor, City of RremPrton Date Executed DEC 2 Q
DOT Form 140 -041 EF
Revised 4/2000
/
Mayor Cary Bozeman
c6ozemanaa bremerton wa
239 4th Street
Bremerton WA98337
July 28, 2003
Ms Kathleen Davis, Director
WSDOT Highways and Local Programs
P O Box 47390
Olympia, WA 98504 -7390
RE Downtown Pedestrian /BTC Access improvements,
Request For Approval of Ferry Toll Credits to Match Federal Funding
Dear Ms Davis
The Downtown Pedestrian /Bremerton Transportation Center (BTC) Access Improvements are
needed to improve ingress and egress from the BTC and relieve the congestion to the City of
Bremer urban core environment The need exists currently, however, the City's current
revitalization and economic development efforts will further exacerbate the traffic conflicts,
further highlighting the need to separate the ferry traffic from the urban core
The plan to resolve these conflicts includes constructing a ferry traffic egress tunnel to eliminate
the significant vehicle /pedestrian conflicts that occur when a ferry unloads vehicles onto
Bremerton's street system Congress has supported the City's vision with approximately $6 2
million to date, and we are confident that the remaining $21 8 million will also be provided, either
all in their next budget cycle, or split between the next two The federal funding summary is
shown in the table below
Federal/ Soft Match
Federal Non - Federal Requested
Section of Law or Funds Match from State
Federal Program Appropriations Act Available Requirement Toll Credits
TEA -21 High Section 1602, TEA -
Pr ton Funds 21 Authorization Act $4,700,000 80/20 $1,175,000
Section 330,
Earmark 2003 Transportation
Appropriations $1,490,250 100 10 0
Anticipated
Earmark or Unknown
SAFETEA High Anticipate
Priority Funds Anticipated Funding $21,809,750 80/20 $5,452,438
Total $28,090,000 $6,627,438
a Page 2 July 28, 2003
In addition, the City is partnering with Kitsap Transit to incorporate the Phase C improvements
to the BTC to address operational needs of WSF Although these Phase C improvements are
funded separately through a FTA grant, the projects are integrally related and will be planned,
designed and constructed cooperatively
The ferry traffic egress tunnel will be under State Route 304 and carry SR 304 outbound traffic
The design of the improvements is being coordinated with WSDOT through your Olympic
Region Local Programs office, and with the federal government through the FHWA and the
FTA Although the project improves both the state highway and Washington State Ferries
facilities, and directly benefits both highway and ferry traffic, the federal funds shown are
sufficient to meet the current cost estimate and there has been no request for direct WSDOT
financial participation The City needs your assistance, however, to meet the local match
requirements for the $4 7 million funding already in hand, as well as for the remaining $21 8
million that is coming
The City is requesting that WSDOT support the project by approving the use of $6 63 million in
Ferry Toll Credits to serve as the required local match for the funds being provided by
Congress Your doing so will boost the City's economic development, make the state highway
safer for both people and vehicles, help the ferries operate more effectively and unload on
schedule, and make being a pedestrian in Bremerton pleasant again
If you have questions, or need additional information regarding this request, please contact me
or Gene Sampley, Director of Public Works & Utilities Thank you for your consideration of this
request, we look forward to your favorable reply
Sincerely,
Cary Bozeman
Mayor, City of Bremerton
cc
W Eugene Sampley, Director of Public Works & Utilities Department, City of Bremerton
Gary Sexton, Director of Economic Development, City of Bremerton
Vi 1! U-i 1J i. r-i.\ icu /UO 06UU i��vu{ JD�.KG11Xt J ucrl�c. �••
1 �
Washington State Temnsportation Building
Department of Tr ansporiation 310 Ma ple Park Avenue S E
Douglas S. MacDonAld PO 0cx47300
secrQtwy orTransportauon 0 WA 96504'300
3M7oa_7Loo
rt Y. 1 000 833.8388
July 13, 2004 urer-v wsdot we gov
The Hoaorable Caxy Bozeman
Mayor, City of Bremerton
Councilman Daren Nygren,
Council President, City of Bremerton
239 Potarth Street
Bremerton OVA 98337
Re Downtown Bremerton Pedestnan/BTC Access
I Improvemetit Project
Dear Mayor Bozeman and Councilman Nygren
I write today regarding the Downtown ldrernerton Pedestrian/BTC Access Improvement Pioje.t
on State Route 304 I understand that the draft Environmental Assessment stage of this project
should be completed shortly.
As we move fro-n the draft Etiviroamental Assessment to the final Environincl7tal Asstvsment,
WSDOT must step forward to fulfill its stat'iitilr} responsibilities fcr managemer_t of this state
ti,ghway proj�C
State law requires WSDOT to "exercise all the powers and perform all the duties necessary,
rcrovtmient, or incidental to be planning, locating, dcstgnitig, constructing, improving,
repairing, operating, and maintaining (of] state highways" (See RCW 47 01260 )
We are prepared to }candle the complex scope issues and public involvement quests rented
of such a project 71e Envirotunental Assessment may raise many issues that wc1I have to �
addressed with the comity before the project could proceed
WSDOT looks forward to continuing to work with the City of Bremerton Randy Haw,
WSDOT's Olympic Reg on Adimirustrator, c2n be reacl•ed via telephone at (360) 357 3605 with
any questions
Sincerely,
v l Donald Douglas B.
Secretary of Transportation
DBM Jaa
cc Randy Hain, WSDOT, 47440
Larry Fhl, WSDOT, 47322
` RECEI, FOR FILING
KITSAP COUNTY CLERK
AUG % 6 2004
1 DAVID W. PETERSON
2
3
4
5
6
7
8 IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON IN AND FORII
9 KITSAP COUNTY, WASHINGTON
10
11 DELL KNAUSS, Case No 04 -2- 02001 -0
Petitioner, -
12 v CITY OF BREMERTON' S '
OPPOSITION TO PETITION FOR
13 THE CITY OF BREMERTON and CITY WRIT OF MANDATE
14 COUNCIL OF BREMERTON,
Respondents
15
16 I. ISSUES
17 The Department of Transportation has plenary authority regarding the
18 construction of state highways SR -304 is a state highway A citizen's initiative petition
19 is not valid if the subject matter of the petition is dictated to the City by a higher power
Bremerton citizens have submitted an initiative petition directing the City of Bremerton
20 to not construct a tunnel on SR -304 Is this a valid subject for an initiative petition?
21
22 If the City does have authority to stop the State from constructing a tunnel the
23 grant of authority is from the legislature to the City Council under RCW 47 24 020
24 When authority is granted to the City Council by the legislature, the exercise of that
authority is not a proper subject for an initiative. Is an initiative to prevent the City
25
Council from authorizing the construction of a tunnel a proper subject for a citizen's
26 initiative?
CITY OF BREMERTON'S OPPOSITION ROGER LUBOVICH
BREMERTON CITY ATTORNEY
TO PETITION FOR WRIT OF 239 4th street, Bremerton, Washington 98337
MANDATE-1 Phone 360 - 473 -2345 Fax 360 -473 -5161
V
i
1 II. FACTS
2 A. Summary
3 On July 12, 2004, the Bremerton City Clerk received a copy of a citizen's
4 initiative which provides "The City of Bremerton shall not construct a vehicular traffic
tunnel as part of its Downtown Pedestnan/BTC Access Improvements project"' The
5 initiative seeks to prevent construction of a traffic tunnel as a part of the improvements
6 planned for State Route 304 in downtown Bremerton The initiative was certified by the
7 County Auditors office on July 23, 2004 as having enough signatures to submit to the
8 voters 2
9 On July 13, 2004, the City received a letter from Douglas B MacDonald, the
10 Secretary of Transportation informing the City that the State was assuming control of the
project as lead agency 3
11 The City Council declined to submit the initiative to the voters because the object
12 of the initiative was not a proper subject matter for the initiative process 4
13 B. Background
14 Construction of the Downtown Bremerton Pedestnan/Bremerton Transportation
15 Center (BTQ Access project will include either surface or tunnel access for automobile
loading and unloading from the ferry 5 The project seeks to improve commuter traffic to
16
and from the Bremerton Transportation Center and increase downtown pedestrian access
17 and safety Federal funds through the Federal Highway Administration and Federal
18 Transit Administration will be utilized 6 The project requires an Environmental
19 Assessment to satisfy both NEPA and SEPA A tunnel is one of the options for the
20 improvements The tunnel will divert traffic off the ferry This will ease traffic on
21
Washington Avenue, the present egress route from the ferry It will not change the grade
of the existing roads 7 The other options are a surface option, and a "no- build" option
22
23
24 Declaration of David P Horton at Exhibit A
2 Id at Exhibit B
25 3 Id at Exhibit C
4 Id at Exhibit D
26 5 Declaration of David P Horton at Exhibit E, Declaration of Randy Hain at ¶ 4
6 Declaration of David P Horton at Exhibit E and F, Declaration of Randy Hain at 13
7 Declaration of Randy Hain at 14
CITY OF BREMERTON'S OPPOSITION ROGER LUBOVICH
BREMERTON CITY ATTORNEY
TO PETITION FOR WRIT OF 239 4th Street, Bremerton, Washington 98337
MANDATE - 2 Phone 360 - 473 -2345 Fax 360 -473 -5161
I C. City Council Actions
2 At its start, the City of Bremerton was the lead agency on the project. Although
3 made possible by federal funds, and subject to WSDOT oversight, the City controlled the
4 process as lead agency As with all State highway projects WSDOT retained overall
authority for the project in an oversight role 8
5 In this role the City Council authorized a professional services agreement with
6 KPFF Consulting Engineers to perform screening analysis for the project on February 19,
7 2003 The screening analysis was necessary to meet City, State, and Federal
g environmental review requirements and to identify a preferred alternative prior to the
9 completion of the environmental permitting process 9
10 On August 13, 2003 the Council authorized a professional services agreement
with Exeltech Consulting Inc to provide engineering and environmental consulting
11 services for the design of Downtown Pedestnan/BTC Access improvements. Exeltech
12 will prepare an Environmental Checklist Summary following its preparation of the
13 Environmental Discipline Reports This will be used in deciding on which design option
14 to pursue 10
15 And on March 24, 2004, the Council approved a Consultant Agreement with
Sampley Consulting to manage the project and provide expertise necessary to maintain
16 project continuity, scope, and schedule 11
17 D. Involvement of the Washington Department of Transportation
18 Under the statutory scheme outlined below, WSDOT has ultimate authority over
19 state highway projects 12 Here it utilized the City as the lead agency, but retained
20 responsibility for the design and construction of the improvement 13 The Federal
21 Highway Administration also requires that WSDOT retain control over projects being
built with federal funds 14
22
23
24 s Id at 3
9 Declaration of David P Horton at Exhibit G
25 10 Id at Exhibit H
" Id at Exhibit I
26 12 Declaration of Randy Hain at 13
13 Id
14 Id
CITY OF BREMERTON'S OPPOSITION ROGER LUBOVICH
BREMERTON CITY ATTORNEY
TO PETITION FOR WRIT OF 239 4th Street, Bremerton, Washington 98337
MANDATE-3 Phone 360 -473 -2345 Fax 360 -473 -5161
I The City has a maintenance agreement with the State for maintenance of State
2 Highway 304 This agreement acknowledges that the State has full jurisdiction,
3 responsibility, and control to and over SR 304 The agreement assigns maintenance
4 responsibilities between the City of Bremerton and the Department of Transportation
The City has also entered into a project agreement with the state for preliminary
5 engineering related to the Downtown Pedestnan/BTC Access Improvement Project 16
6 The scope of this agreement includes analysis of a potential ferry exit tunnel, roadway
7 reconstruction and realignment, transit enhancements, channelization, signalization,
g sidewalk and streetscape improvements, illumination, landscaping and drainage
9 improvements
10 In summary, the State coordinated for the City to be lead agency for its
convenience This allows the State to use local personnel and expertise while
11 maintaining overall control of the local highway project as required by RCW 47 01 and
12 the Federal Highway Administration
13
14 E. Initiative language
15 The ordinance proposed by the initiative reads
The City of Bremerton shall not construct a
16 vehicular traffic tunnel as part of its Downtown
17 Pedestnan/BTC Access Improvements project. 17
18 F. Recent Developments
19 The State has assumed control of the project as lead agency Ina letter dated July
13, 2004 Secretary of Transportation Douglas MacDonald gave notice of their intent to
20 take over administration of the project
21 As we move from the draft Environmental Assessment to
the final Environmental Assessment WSDOT must step
22 forward to fulfill its statutory responsibilities for
23 management of this state highway project
24 State law requires WSDOT to "exercise all the powers and
perform all the duties necessary, convenient, or incidental
25
26 15 Declaration of David P Horton at Exhibit J
16 Id at Exhibit K
17 Id at Ex A
CITY OF BREMERTON'S OPPOSITION ROGER LU13OVICH
BREMERTON MY ATTORNEY
TO PETITION FOR WRIT OF 239 4th Street, Bremerton, Washington 98337
MANDATE-4 Phone 360473 -2345 Fax 360473 -5161
� I
I to the planning, locating, designing, constructing,
Improving, repairing, operating and maintaining [of] state
2 highways" (See RCW 47 01 260 ) 18
3 The City and WSDOT then executed an agreement to coordinate the transfer of
4 responsibility 19
5 III. ARGUMENT
6 A. Statutory Framework
7 As a first class city, the City of Bremerton has the power
[t]o lay out, establish, open, alter, widen, extend, grade,
8 pave, plank, establish grades, or otherwise Improve streets,
alleys, avenues, sidewalks, wharves, parks, and other public
9 grounds 21
10 And
[t]o construct and keep in repair bridges, viaducts, and
11 tunnels, and to regulate the use thereof 22
12
But the proposed tunnel is part of SR -304, a state highway 23 And state highways
13 are the responsibility of the Washington State Department of Transportation WSDOT is
14 vested by the legislature with the power to
15 perform all the duties necessary, convenient, or Incidental
to the planning, locating, designing, constructing,
16 improving, repairing, operating, and maintaining state
highways, including bridges and other structures, culverts,
17 and drainage facilities and channel changes necessary for
18
the protection of state highways .24
19 This plenary power over state highways within cities is somewhat limited by
20 RCW 47 24 020
The jurisdiction, control, and duty of the state and city or
21 town with respect to [state highways within cities] is as
22 follows
23
24 18 Id at Exhibit C
19 Id at Exhibit L
25 20 RCW 35 01010, Bremerton City Charter
2' RCW 35 22 280 (7)
26 22 RCW 35 22 280 (12)
23 RCW 47 17 556
"RCW 47 01 260
CITY OF BREMERTON'S OPPOSITION ROGER LUBOVICH
BREMERTON CITY ATTORNEY
TO PETITION FOR WRIT OF 239 4th Street Bremerton, Washington 98337
MANDATE-5 Phone 360473 -2345 Fax 360 -473 -5161
I
1 (1) The department [of transportation] has no authority
to change or establish any grade of any such street without
2 approval of the governing body of such city or town, except
3 with respect to limited access facilities established by the
commission 25
4
Here, it is agreed that the portion of SR -304 at Issue is not a limited access
5 facility And although the tunnel would be built below existing streets, it is a by -pass
6 route The grade of the existing highway (on Washington Avenue, Pacific Avenue and
7 Burwell) will not be affected 26 As will become evident below, even if the proposed
8 tunnel is a grade change, the initiative is still invalid
9 In summary, the proposed tunnel is being built as part of a state highway system
10 WSDOT has plenary authority to place and construct state highways except on limited
access highways, or when the grade of an existing street will change
11 B The Subject Matter of the Proposed Initiative is Administrative, and Not
12 Subject to Initiative
13 Bremerton's City Charter provides for the process of initiative and referendum by
its citizens Procedural requirements must be met before an initiative is valid 27 Here
14 those procedural requirements were met But in addition to procedural requirements
15 there are two court created tests that must be applied to initiative measures to determine if
16 they concern valid subjects for the exercise of the power of initiative.
17 In order for a petition to be valid 1) the character of the action must be legislative,
18 not administrative And 2) the grant of authority for the proposed action must be given to
the City as a corporate entity, not to the City Council These tests are outlined and
19
described below
20
21
22
23
24
25
26 25 RCW 47 24 020
26 Declaration of Randy Hain at 14
27 See RCW 35 17 240 — 35 17 360
CITY OF BREMERTON'S OPPOSITION ROGER LU13OVICH
BREMERTON CITY ATTORNEY
TO PETITION FOR WRIT OF 239 4th Street, Bremerton, Washington 98337
MANDATE-6 Phone 360 -473 -2345 Fax 360 -473 -5161
1
2 Is the Proposed Ordinance Beyond the Scope of the
3 TEST 1 Initiative Power?
Is it Administrative - Is it
4 What are ? Does it pursue a plan NO Legislative—
trying to do? already adopted by the Is the subject of
5 Stop the
construction Council itself or some the initiative
6 of a State power superior to it? permanent or
Highway Ruano v Spellman 81 general or a
7 project W 2d 820 (1973) new policy or
plan'? Ruano
8 YES
YES
9 NO
NO
10
Is the grant
11 of authority :O:R Test 2
to the
legislative What gives us
12 authority of Is the grant of the authority to
the City authority to the do it?
13 Lince v City as a
Bremerton corporate
14 25 Wn App entity Lince
309 (1980)
15
16 YES YES
17
18
19 Not subject
20 to initiative Subject to Initiative Power
21 power
22
23
24
25
26
CITY OF BREMERTON'S OPPOSITION ROGER LUBOVICH
BREMERTON CITY ATTORNEY
TO PETITION FOR WRIT OF 239 4th Street, Bremerton, Washmgton 98337
i
I Test 1: Legislative of Administrative?
2 The first test applied by the courts In Washington is whether the underlying
3 council action is legislative or administrative This test looks at what is trying to be
4 accomplished by the Initiative The power of the people to adopt legislation directly
through the Initiative process is limited to actions that are legislative 28 When an action is
5 administrative the decision is not subject to Initiative or referendum powers
6 An act is characterized as legislative or administrative by asking two questions
7 1 If the action relates to a subject of a permanent and general character, then
8 they are regarded as legislative Those providing for subjects of a temporary
9 and special character are regarded as administrative
2 The power to be exercised Is legislative in nature if it prescribes a new policy
10
or plan But it is administrative in nature if it merely pursues a plan already
11 adopted by the legislative body Itself or some power superior to it 29
12 The decision to construct a tunnel is of a permanent and general character But
13 the decision whether to build a tunnel will be made by a higher power, WSDOT As
14 such, the answer to the second question dictates the proposed action is administrative
15 Because the City cannot control the construction of a state highway, a decision
concerning whether to construct the street improvement project to SR 304 by means of a
16 tunnel is not a legislative decision of the city council The decision to construct a mayor
17 street Improvement to SR 304 in downtown Bremerton by means of a vehicular traffic
18 tunnel merely pursues a plan already adopted by some power superior to It In this case
19 that power is the State
20 The key decisions relating to this project are no longer subject to the control of
21 the City Council This is true for the underlying decision whether to pursue the project at
all and also for the decision whether the project should be completed by means of a
22 tunnel
23 Seattle Building and Construction Trades Council v Seattle 30 is illustrative An
24 initiative was proposed by citizens in Seattle to withdraw the city's participation In a
25
26 28 Ruano v Spellman, 81 Wash 2d 820, 505 P 2d 447 (1973)
29 Citizens for Financially Responsible Government v Spokane, 99 Wn 2d 339 (1983)
30 94 Wn 2d 740, 620 P 2d 82 (1980)
CITY OF BREMERTON'S OPPOSITION ROGER LUBOVICH
BREMERTON CITY ATTORNEY
TO PETITION FOR WRIT OF 239 4th Street, Bremerton, Washington 98337
MANDATE - 8 Phone 360 -473 -2345 Fax 360473 -5161
I limited access highway project (an improvement to a portion of Interstate 90) As here, I-
2 90 was designated as a state route in RCW 47 17 140 The project was financed
3 exclusively by federal and state highway funds The initiative was challenged as being
4 beyond the powers of the initiative process The Supreme Court concluded that the
initiative process did not apply because the actions remaining to the City of Seattle were
5 administrative in nature and thus not subject to a citizen's initiative
6 The city had no authority to act in a legislative capacity regarding the location and
7 construction of the limited access facility The city could not ban construction of the
8 facility The city could not refuse to cooperate in construction once the plan had been
9 adopted The key decisions regarding the project were made by the state
Here, the City cannot stop construction of the highway The State will exercise its
10
plenary authority over state highways and move forward with or without the consent of
11 the City Because the action is administrative and this is not a proper subject for a
12 citizen's initiative, there is no need to address the second test
13 What if we are wrong?
14 It could be argued that the tunnel is a grade change and requires City Council
15 approval under RCW 47 24 020. The City does not agree with this position The tunnel
will be a new diversion for traffic from the tunnel, and will not change the grade of the
16 existing highway 31 If RCW 47 24 020 is applicable, the City Council can choose to not
17 approve the tunnel construction This action would be legislative, and the first test is
18 satisfied But, the second test, described below, dictates the same result — this is not a
19 proper subject for initiative
20 Test 2: Is the Underlying Grant of Authority Given to the City as a Corporate
Entity or to its Governing Body?
21 The second test to determine if a city council action is subject to the initiative process
22 is whether the underlying grant of authority by the state legislature for the action being
23 taken is to the city as a corporate entity or to its legislative authority (which is the city
24 council for cities) 32
25
26
3 1 Declaration of Randy Hain at 14
32 See Lince v Bremerton, 25 Wn App 309 (1980), and Leornard v Bothell, 87 Wit 2d 847 (1992)
CITY OF BREMERTON'S OPPOSITION ROGER LUBOVICH
BREMERTON CITY ATTORNEY
TO PETITION FOR WRIT OF 239 4th Street, Bremerton, Washington 98337
MANDATE-9 Phone 360 -473 -2345 Fax 360 -473 -5161
I If the grant of authority is to the city as a corporate entity, direct legislation by the
2 people in the form of initiative or referendum is permissible If the grant of power is to
3 the legislative authority of the city, then initiative and referendum is prohibited 33
4 The City of Bremerton is a charter city
The constitution specifically provides, however, that city
5 charters must be "consistent with and subject to the
Constitution and laws of this state " Wash Const Art 11, s
6 10 In State ex rel Guthrie v Richland, 80 Wash 2d 382,
7 384 494 P 2d 990, 991 (1972), the court stated that
where the general law grants authority to the legislative
g authority of a city, that authority may not be exercised by
the city as a corporate entity, nor is the exercise of that
9 authority by the legislative authority subject to repeal,
amendment or modification by the people through the
10 initiative or referendum procedure See Trautman,
Initiative and Referendum in Washington A Survey, 49
11 Wash L Rev 55, 82 (1973) 34
12
13 Lance v Bremerton 35 is directly on point RCW 47 01 260 gives the governing
body of the City of Bremerton authority to approve changes of grade on state highways
14
within the City Because this statute directly references the governing body, the primary
15 grant of authority by the state legislature is to the council It is not subject to initiative In
16 Lance a citizen's initiative attempted to modify the City's zoning ordinance. The first test
17 as to whether it was a legislative action was met The change was a permanent and
18 general change to the zoning code But the legislature has delegated the zoning power
19 specifically to the governing body of the City. Because of this, changing the zoning
code is not a proper exercise of the initiative power 36 If the authority is granted to the
20 City in its corporate capacity, it is a proper subject for initiative For example, if the
21 grant of authority stated "first class cities have the power to approve grade changes" or if
22 a RCW 35 22 280 gave authority to control state highway projects to cities then a
23 citizen's initiative would be proper
24
25
33 Id
26 34 Id at 312
35 Id
36 Id See also Leonard v Bothell, 87 Wash 2d 847, 557 P 2d 1306 (1976)
CITY OF BREMERTON'S OPPOSITION ROGER LUBOVICH
BREMERTON CITY ATTORNEY
TO PETITION FOR WRIT OF 239 4th Street, Bremerton, Washington 98337
MANDATE - 10 Phone 360473 -2345 Fax 360473 -5161
I Because the grant of authority to approve, or disapprove of grade changes to state
2 highways within a City is delegated to the legislative body of the City, it is not a proper
3 subject for a citizen's initiative
C. The Subject Matter of the Initiative is Rendered Moot by the Action of the
4 WSDOT.
5 A City cannot be ordered to hold an election on an initiative ordinance when the
6 issue addressed by the ordinance is moot While the City was the lead agency on the
7 project, and was responsible for the design and construction of the project, WSDOT has
8 always had statutory responsibility for the project They have taken over as lead agency
As such, the City of Bremerton will not "construct a vehicular traffic tunnel as part of its
9 Downtown Pedestnan/BTC Access Improvements project "
10 This situation is analogous to the facts of Yakima v Huza 37 The citizen's of
11 Yakima sought to adopt an ordinance repealing certain taxes By the time the issue was
12 tried the ordinances had already been repealed by the City Council The initiative
13 proponents sought to submit the ordinance to the voters even though the proposed
ordinance would repeal no present taxes The Supreme Court held that
14 [t]he city cannot be ordered to hold an election in this
15 instance because it would be requiring the city to erform a
useless act, and to expend public funds uselessly 3
16
Because WSDOT will move forward with design and construction on this state
17
highway project regardless of the City of Bremerton's objections, requiring the City to
18 submit this issue to the voters of the City would be requiring the City to perform a useless
19 act and expend public funds uselessly
20 IV. CONCLUSION
21 The subject matter of the initiative is moot The state has plenary authority over
22 the project Any authority of the City was, and is, subordinate to WSDOT. Because the
details of the construction of the state highway at issue rest with the state (a higher
23
power), an initiative to adopt a city ordinance that gives direction to the City is not a
24 proper subject for an initiative And if there authority to deny the state the right to
25 construct a tunnel, that right rests solely with the City Council. And under the holding in
26
37 67 Wash 2d 351, 407 P 2d 815 (1965)
" Id at 360
CITY OF BREMERTON'S OPPOSITION ROGER LUBOVICH
BREMERTON CITY ATTORNEY
TO PETITION FOR WRIT OF 239 4th Street, Bremerton, Washington 98337
MANDATE - 11 Phone 360 -473 -2345 Fax 360473 -5161
I Lance the exercise of this power is not subject to the initiative process Petitioner's
2 request for the issuance a writ of mandate must be denied
3 Dated this day of August, 2004
ROGER A LUBOVICH
4 Bremerton City Atto ey
5
6 By
David Horton, ssistant City Attorney
7 WSB # 27123
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
CITY OF BREMERTON'S OPPOSITION ROGER LU13OVICH
BREMERTON CITY ATTORNEY
TO PETITION FOR WRIT OF
239 4th Street, Bremerton, Washington 98337
MANDATE - 12 Phone 360 - 473 -2345 Fax 360 -473 -5161
AUG -25 -2004 WED 01:05 PM 6` " * SW REGION FAX NO. 7,0 905 2222 P. 02/03
1
RECEIVED FOR FILING
2 KITSAP COUNTY CLERK
3 AUG 2 g 2004
4 DAVio W, PETERSOJV
5
6
7
8 IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON
IN AND FOR THE COUNTY OF KITSAP
9 DELL KNAUSS, NO 04 -2- 02001 -0
10 Petitioner, DECLARATION OF RANDALL A.
11
V. HAIN, P E, WSDOT
THE CITY OF BREMERTON and
12 CITY COUNCIL OF
13 BREMERTON,
14 Respondents.
15
16
17
18
19 I, Randall A Hain, P E, affirm under penalty of penury under the laws of the State of
20 Washington that the following is a true and correct statement to the best of my knowledge
21 1 I am the Regional Administrator for the Washington State Department of
22 Transportation (WSDOT), Olympic Region, as well as a licensed professional engineer
I
23 2 . The WSDOT, Olympic Region, has the ultimate decision- making authonty for the
24 proposed State Route 304 Downtown Bremerton Pedestrian/BTC Access Improvement Pioject,
25 pursuant to RCW 47.01.260, where the law requires the department to "exercise all the powers
DECLARATION OF RANDALL A HAIN, 1 Attorney General of Washington
PE, WSDOT Transportation & Public Constriction Division
905 Plum Sheet, Building I
POB 40113
Olympia, WA 98504 -0113
(360)753 -6126
AUG -25 -2004 WED 01;06 PM V SOT SW REGION FAX NO. _ - 0 905 2222
P. 03/03
1 and perform all the duties necessary, convenient, or incidental to the planning, locating, designing,
2 constructing, improving, repairing, operating, and maintaining state highways ."
3 3 Although the WSDOT has full decision - making authority over all aspects of state
4 highway location, design, construction, operation and maintenance, it often works with local
5 jurisdictions, such as the City of Bremerton, on highway design and/or construction projects
6 Sometimes, the WSDOT will permit a local jurisdiction to be the lead agency on a project, which
7 means that the city or county merely coordinates the administration of a project The WSDOT,
8 however, remains solely responsible for approving design, construction contracts, project
9 inspections and acceptance, and other project features WSDOT retains all authority to administer
10 a project, at any time that it sees fit Further, when there are Federal Highway Administration
11 (FHWA) funds in a project, as is the case for the SR 304 improvement, FHWA requires that the
12 WSDOT be responsible for the highway project. FHWA also requires that WSDOT sign the
13 environmental documents. Since the environmental aspects of the SR 304 project aie complex
14 and require public involvement, the WSDOT has decided to exercise is statutory authority and
15 become lead agency
16 4 At this juncture, one of the alternatives being considered to improve ferry traffic
17 flow on SR 304 is the construction of a 930 foot tunnel to more efficiently direct a percentage of
18 the flow of exiting ferry traffic. Ferry traffic will still have the option of exiting into the City of
19 Bremerton by Washington Street, basically in same manner and at the same giade as is currently
20 available to travelers
21
22 SIGNED this day of August, 2004 Olympia, Washington
23 e ,
24 RANDALL A HAIN, P E
Regional Administrator
25 Olympic Region
Washington State Department of Transportation
DECLARATION OF RANDALL A HAIN, 2 Attorney General of Washington
PE, WSDOT Transportation & Public Construction Dtvtsion
905 Plum Street, Building 3
POB 40113
Olympia, WA 98504-0113
(360)753 -6126
f
Y
I,
1
2
3 RECEIVED FOR FILING
KITSAP COUNTY CLERK
5 PAVIw q,
6
7
8 IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON IN AND FOR
9 KITSAP COUNTY, WASHINGTON
10
11 DELL KNAUSS, Case No 04 -2- 02001 -0
Petitioner,
12 v DECLARATION OF DAVID P
HORTON
13 THE CITY OF BREMERTON and CITY
14 COUNCIL OF BREMERTON,
Respondents
15
16 David P Horton declares
17 1 I am over the age of eighteen and am competent to testify I make this
18 declaration from personal knowledge
19 2 I am the Assistant City Attorney for the City of Bremerton
3 Attached as Exhibit A is a true and correct copy of Initiative 101
20
4 Attached as Exhibit B is a true and correct copy of Kitsap County Auditor's
21 Certificate of Sufficiency regarding Petition Initiative 101
22 5 Attached as Exhibit C is a true and correct copy of July 13, 2004
23 correspondence from Douglas B MacDonald
24 6 Attached as Exhibit D is a true and correct copy of City of Bremerton City
Council Resolution No. 2933
25
7 Attached as Exhibit E is a true and correct copy of April 29, 2002
26
correspondence from Mayor Bozeman enclosing cost estimates and concept design for the
_ 1 ROGER A LUBOVICH
BREMERTON CITY ATTORNEY
239 4th Street, Bremerton, Washington 98337
Phone 360 -473 -2345 Fax 360 -473 -5161
I proposed tunnel
2 8 Attached as Exhibit F are true and correct copies of December 16, 2002
3 correspondence from Congressman Norm Dicks and July 28, 2003 correspondence from
4 Mayor Cary Bozeman
9 Attached as Exhibit G is a true and correct copy of City of Bremerton City
5 Council Agenda Bill No 03 -0326
6 10 Attached as Exhibit H is a true and correct copy of City of Bremerton City
7 Council Agenda Bill No 03 -149
g 11 Attached as Exhibit I is a true and correct copy of City of Bremerton City
9 Council Agenda Bill No 04 -046
10 12 Attached as Exhibit J is a true and correct copy of Agreement DC -00732
between the State of Washington and the City of Bremerton
11 13 Attached as Exhibit K is a true and correct copy of Local Agency Agreement
12 No LA 5522 between the Washington State Department of Transportation and the City of
13 Bremerton
14 14 Attached as Exhibit L is a true and correct copy of August 5, 2004 Letter of
15 Understanding between the City of Bremerton and Washington State Department of
Transportation
16 I declare under penalty of penury under the laws of the State of Washington that
17 the foregoing is true and correct
18 Dated Aousf 94 , 2004 at Bremerton, Washington
19
20 5!;ID NORTON
21
22
23
24
25
26
- 2 ROGER LUBOVICH
BREMERTON CITY ATTORNEY
239 4th Street, Bremerton, Washington 98337
Phone 3 60 -473 -2345 Fax 360 -473 -5161
INITIATIVE 101
"Citizens Against The Tunnel (GATT)" Wants to Give you the
RIGHT TO VOTE ON A TUNNEL
INITIATIVE PETITION FOR SUBMISSION TO THE CITY COUNCIL OF BREMERTON, WASHINGTON
To the City Clerk of the City of Bremerton, Washington We, the undersigned registered voters of the City of Bremerton, Washington, respectfully direct that this petition and the proposed ordinance contained herein entitled An ordinance prohibiting construction
of a downtown tunnel be enacted into law and furthermore if the City Council fails to enact this ordinance that it be submitted to a vote of the people at a regular or special election to be held on a date and in the manner required by the Revised Code of
Washington, and each of us for himself or herself says I have personally signed this petition, I am a legal voter of the City of Bremerton Washington my residence address is correctly stated and I have knowingly signed this petition only once
Statement of Action Sought
The purpose of this initiative is to prohibit the City of Bremerton from constructing a vehicular traffic tunnel as part of the Downtown Pedestrian/BTC Access Improvements project Such an initiative is authonzed by the Bremerton City Charter Section 5 and
Section 36, adopting RCW 35 17 240 through RCW 35 17 360
Text of Ordinance The proposed ordinance reads as follows Ordinance _(Initiative #101) An ordinance of the City of Bremerton prohibiting constriction of a vehicular traffic tunnel as part of the Downtown Pedestrian/BTC Access Improvements
The City of Bremerton Does Ordain Section l The City of Bremerton shall not construct a vehicular traffic tunnel as part of its Downtown Pedestrian/BTC Access Improvements project
Warning Every person who signs this petition with any other than his or her true name, or who knowingly signs more than one of these petitions, or signs a petition seeking an election when he or she is not a legal voter, or signs a petition when he or she is
otherwise not qualified to sign, or who makes herein any false statement, shall be guilty of a misdemeanor
CITY OF BREMERTON INITIATIVE TO THE PEOPLE CITY OF BREMERTON VOTERS SIGN BELOW
Petitioner s St
Petitioner s Residence Address
nature Date Petitioner's Printed Name Must reside within City limits of Bremerton City or Town Zip Coun
I Q
2
3
4
5
6
7
8
9
10
MAIL COMPLETED PETITIONS TO
CITIZENS AGAINST THE TUNNEL (CATT)
PO Box 502, Bremerton, WA 98337
(360) 373 -1594
e
r
07/23/2004 15 58 FAX 360 -_/ 5769 KITSAP COUNTY ELEC,,ONS X002
4 Karen Flynn
K1tsap County Auditor- Elections & Voter Registration
BHiNG 1026 Sidney Avenue, Suite 175 + Port 0 chard, Waslnngton 98366 -4678
Telephone (360) 337 -7128 • Facsini le (360) 337 -5769
Adi Ariwoi
Ftnanc'al Services Mana
Winnie Flores -Log
Chief Deputy Audi
CERTIFICATE OF SUFFICIENCY
I hereby certify, in accordance with RCW 35,17.260, that the Petition
Initiative 101 from the City of Bremerton, Washington (Citizens Against The
Tunnel), was signed by at least twenty -five percent (2,060 of 8,23 8) of the votes
cast for all candidates for mayor at the last general election at the last preceding
general election.
WITNESS my hand and official seal of office affixed
this 23' day of July 2004,
V , i
l \
KARBIV FL '� • �,/� f
Kltsap County Auditor
B
u
Administration Accounts payable payroll Vehicle Llcenaing
(380) 337 -7129 (300) 337 -7122 (360) 337 -7729 (360) 337-4440 onaln Public Records
Fax 337-4645 Fax. 337 -7016 Fax: 337.7010 C__ ... ._._
(360) 337 4935
07/13/04 13 12 FAX 360 _6 6800 WSDOT SECRETARY'S uFFICE
1 0002
V
Aft
W79 Washington State
Department Of Transportation Transportation Bullding
Douglas 03. MacDonald 310 Maple Park Avenue 5.E
Secretary of Transportation P.0 Box 47300
Olympla. WA 96504 -7300
360 - 705 -7000
TTY, 1- 800 - 833.6388
July 13, 2004 www wsdot wa gov
The Honorable Cary Bozeman
Mayor, City of Bremerton
Councilman Daren Xygren,
Council President, City of Bremerton
239 Fourth Street
Bremerton WA 98337
Re. Downtown Bremerton Pedestrian/BTC Access
Improvement Project
Dear Mayor Bozeman and Councilman Nygren:
I write today regarding the Downtown Bremerton Pedestrian/J3TC Access Improvement ProJect
on State Route 304. I understand that the draft Environmenta Project
Assessment stage of this
should be completed shortly.
As we move from the draft Environmental Assessment to the final Environmental Assessment,
WSDOT must step forward to fulfill its statutory responsibiliti
highway project s for management of this state
State law requires WSDOT to "exercise all the powers and perform all the duties neees
convenient, or incidental to the planning, sary,
C designing, constructing, " S, improving,
repairing, operating, and maintaining [of) state highways (See RCytr 47 01.260 )
We are prepared to handle the complex scope issues and public involvement question required
Of such a project. The Environmental Assessment may raise many Issues that will have to be
addressed with the community before the project could proceed
WSDOT looks forward to continuing to work with the City of Bremerton Randy Hain,
WSDOT's Olympic Region Administrator, can be reached via telephone at (360) 35 7 -2605 with
any questions,
Sincerely,
Douglas 13. acDonald
ScCretary of Transportation
DBMJaa
cc Randy Hain, WSDOT, 47440
Larry Ehl, WSDOT, 47322
C
RESOLUTION NO. 23 33
A RESOLUTION of the City Council of the City of
Bremerton, Washington, taking action not to submit to the
qualified electors of the City of Bremerton at the November 2,
2004 General Election, Initiative Petition 101 relating to
construction of a vehicular traffic tunnel as part of the Downtown
Pedestnan/BTC Access Improvements Project
WHEREAS, an Initiative Petition signed by registered voters, equal in number to
at least twenty -five percent of the total votes cast for all candidates for Mayor at the last
preceding City of Bremerton election, has been filed with the City Clerk as provided for in RCW`
35 17 260, and
WHEREAS, the Petition seeks to prohibit the City from constructing a traffic
tunnel as part of the Downtown Pedestnan/BTC Access Improvements Protect ( "Project")
WHEREAS, the City Clerk, through the Kitsap County Auditor, on July 23, 2004,
verified the sufficiency of the signatures thereto; and
WHEREAS, RCW 35 17 260 provides for the matter to be presented to the City
Council within 20 days of certification of sufficiency of signatures for either adoption of the
ordinance as proposed or to forward the initiative to election on November 2, 2004, and
WHEREAS, the County Auditor requires a Resolution approved by the City
Council authorizing the placement of the proposition on the November General Election, and
WHEREAS, the State of Washington, in a letter from the Secretary of
Transportation received by the City on July 13, 2004, notified the City that the State is assuming
the Project, and
WHEREAS, because the State has assumed jurisdiction of the Project, the City
Council finds that the subject matter of the initiative petition is not a valid subject pursuant to
Seattle Building and Construction Trades Council v. Seattle, 94 Wn 2d 740 (1980), the issue
presented in the initiative petition is now moot, and submitting the initiative to a vote of the
citizens would be confusing in that the voters may think may think they have an impact on the
tunnel decision, and
WHEREAS, the City Council has three options when reviewing the initiative
petition: 1) adopt the proposed ordinance, 2) submit the initiative to a vote of the citizens, or 3)
decide not to submit the initiative to a vote of the citizens; and
WHEREAS, because of the above -noted findings, the City Council finds that it
would be inappropriate to submit the Initiative Petition to the voters; NOW THEREFORE
i
Initiative Petition 101
rr
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS
SECTION 1. The recitals set forth above are hereby incorporated as if set forth
herein in full
SE_ CTION2. Initiative Petition 101 shall not be placed on the November
General Election
SECTION 3. Severabtlrty If anyone or more sections, subsections, or
sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this Resolution and the same shall remain in full
force and effect.
SECTION4. E ectzve Date This Resolution shall take effect and be in force
immediately upon its passage
PASSED by the City Council of the City of Bremerton, Washington this
day of 7 2004
DAREN NYGREN, Counc President
APPROVED AS TO FORM ATTEST
4 ffl -1 E a RA. L H, City torn A J N, City Clerk
R \LEGAUResolutionACity CouncillImdahve Petition doc
2
Initiative Petition 101
Ma Cary Bozeman
April 29, 2002
Congressman Norm Dicks
2467 Rayburn House Office Bldg
Washington DC 20515
Dear Representative Dicks
You'll find enclosed the cost estimates and concept design for the Pacific Avenue tunnel This
tunnel will catalyze a solution for the conflict created by the departing vehicular traffic from the
Bremerton ferry Currently, no holding area exists for the vehicles, a situation which consistently
clogs the main downtown streets with each vessel arrival
The engineered solution moves the outgoing two lanes of ferry traffic from the waterfront
Washington Avenue to a tunnel running west on First Street, north on Pacific Avenue and exiting
west on Burwell Avenue The tunnel enables Bremerton's core to become pedestrian friendly Even
for today's Bremerton pedestrian, crossing Washington Avenue during ferry arrivals can prove to be
a daunting task Compounded with the city's future projects, a pedestrian- friendly environment is
not only desirable, it is paramount for access to the new Maritime Park, the Navy park on Pacific
Avenue, the regional conference center, the new government center, the Navy parking garage, new
condominiums on Washington Avenue, a projected entertainment center, and unproved circulation
and pedestrian amenities All of these developments are projected to commence construction in the
next two years As we know, the tunnel approval is crstncal to this vitalization effort
The entire South Puget Sound water corridor, in both transportation and recreational interests, will
receive quantum enhancement by seizing this uruque, one -tune opportunity With this foresight in
mind, the need for immediate action cannot be underscored enough
The attached total tunnel construction cost is estimated at $17,093,362 plus contingencies of
$6,837,000 The projected architect and engineering, including EIS and NEPA permitting, totals
$3,862,557 The entire project would primarily be spread over the 2003, 2004, and 2005 calendar
years Engineering, permitting and iiutial Phase I construction in the year 2003
will require estimated funding between $4,500,000 and $5,100,000, engineering and construction in
2004, in the sum of $8,400,000, and construction and contingencies in 2005 ranging between
$8,000,000 and $12,400,000
On behalf of the City of Bremerton, Kitsap County and the entire Olympic Peninsula communities, I
can not thank you enough for investing in this tremendous opportunity
S erely,
__ �2r__
Mayor Cary Bozeman
I
I
I
CITY OF B REMERTON
Ferry Exit Traffic
Transportation Project
E E,��
_
FUTURE GOVERNMENT CENTER
a
i ri'EYERGREEN PARK
UEM� I
i
I
,a
slNO yi
,.
vu
I s
I ! _
I I - FuruRE Nousl i
- i
" - MARINA EXPANSION
TLNNEI BOARDWALK r�
�--- r - ,
FUTURE CON NTER
PUGET SOUND N/WAL SHIPYARD - ' I
` \� t
EUM
L D \\,
�• \ `t \..,`. �\ / I ` c -- �' MARINA \`\
t S N R
\ a • s. � ,\ v
1
MARITI
1
I
CITY of BREMERT ®N
UDBB TRANSPORTATION IMPROVEMENT S T IJUY
rK 2003
Studies Duration Qtr 2 Qtr 3 Qtr 4 Qtr 1 2004
40 Wks Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 2005 2006
Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2
Kick -Off
0 wks � 613
Data Research
10 wks nalysis 10 wks
ve Development
10 Wks
6
Stakeholder Involvment
0 wks
7 Engineering Sceening --~ -- 10/18 ;
_ I 10 wks
8 Stake holder Involvement �-
0 wks
9 Select Preferred Options '" - -' 12/27
0 Wks ,
10 Refine Preferred Tunnel Concept _ 10 wks 12127
11 Refine Temp Facilities Concept 10 wks
12 Pre - Design Complete
0 wks
13 Final Design, 317
50 wks
14 30% Design Package 16 wks
,
15 OwnedStakeholder Revew 3 wks
16 60% Design Package T 12 wks
17 Owner Stake holder Review __� --
3 wks
18 100% Design Package 12 wks
19 Owner Stakeholder Review 2 wks
20 Final Design Package 2 wks
21 Design Complete 0 wks
22 Final Design, Tunnel 70 12/12
Wks ,
23 30% Design Package 20 wks
24 Owner /Stakeholder Revew
2 wks
25 60% Design Package 20 wks ,
26 Owner Stake holder Review 2 wks
I
City of Bremerton Transportation Improvement str►r1w 9 -loo.,
ID Task Name 2003
27 100% Design Package ! Duration Qtr 2 Qtr 3 Qtr 4 Qtr 1 2004
20 Wks Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 2
_ Qtr 3 Qtr 4 Qtr 1 Qtr 2 20GG
28 Owner Stakeholder Review Qtr 3 Qtr 4 Qtr 1
2 Qtr 2
jw � wks � ,
29 Final Design Package _ r
4 Wks
30 Design Complete
0 Wks
31 Permit Process_____ "�
_ _ 75 Wks 7/9
32 EIS Process �R__ -'_ " ""�--
75 Wks
33 Approval for Temp Facilities I ___ _ ,
_ 48 Wks
34
- Approval for Entire Tunnel
75 wlcs
Shoreline and Building Permits ~ ' Y (
_ I 75 wks
36 Approval for Temp Factli ii; j
37
Approval for Entire Tunnel 75 Wks
38 Phase 1 Constru ctionTempora ry Facilltl� 33 Wks
39 Bid and Award Contract
_ ` 6 Wks
40 Temp Utilities �`�`�" "
_ 26 Wks
41 Temp, StreeMaffic mos.
_ d �26 Wks
42 System Crossover - 1 wk
43 Phase 2 Construction, Tunnel �
93 Wks
44 Bid and Award Contract
8 Wks
45 _ Demolition �� ' ` �" 16 wks -
_
Excavation and Shoring 32 Wks
47 Tunnel and Wall Construction 32 wks
48 _ Tunnel Systems Installation ; 24 wits
49 Street Improvements, Signals, Signagc I T 16 wks
50 Project Complete " °
1 0 Wks
4/2U
City of Bremerton Transportation Improvement Study, 2 -lane Ferry FYit TiiP,
CITY OF BREMERTON
2 -Lane Ferry Exit Lane Tunnel under First and Pacific
SUMMARY PROJECT SCHEDULE
Date 4/25/02
2002 2003
2004 2005
2006
Pre - Design or TS &L Study
EIS / NEPA
Shoreline and Building permits etc
Design - Temporary Facilities
Design - Tunnel
Construction - Temporary Facilities
Construction - Tunnel
City of Bremerton
"r
I ransportation Improvement Study
2-Lane Ferry Exit Lane Tunnel Under First and Pacific A/15'5/02
I I Category/Description Unit Unit Quantity ost
Tem Facilities Price
,Porary Utilities L S $ 200,000 $ 200,000
Temporary Ferry ops L S $ 1,000,000 $ 1,000,000
Traffic Control L S $ 250,000 1 $ 250,000
0
0
5 st
0
0
0 0
0
0 0
0
0 0
0
0
Site Work
Demolition L S. $ 250,000 1 $ 250,000
Temportary Shoring Sq Ft $ 25 55,0()o $ 1,375.0100
Excavation for Tunnels Cu Yds $ 20 35,424 $ 708,481
Excav For Cut Walls Cu Yds $ 20 5,481 $ 109,630
r
Contaminated Materials Allowance L S $ 250,000 1 $ 250n,Onoon
Construction Dewatenng L S $ 250.000 1 $ 250,000
Utility Relocation L S $ 500,000 1 $ 500,000
Tunnel Structures
Tunnel Concrete Lin Ft $ 4,500 111100 $ 4.950.000
Tieback Entry/Exit Walls, 10' avg Sq Ft. $ 120 4.000 $ 480,000
Burwell Street Widening
Tieback Wall, 30 it avg. Sq Ft. $ 120 6,000
Backfill Cu Yds. $ is 5,556 $ 720,000
$ 83,333
Street Widening/Curb Sq. Ft. $ 5 7,500 $ 37,500
Tunnel Systems
Drainage L S $ 300,000 1 $ 300,000
Pump Station L S $ 150,000 1
HVAC L S $ 1.500.000 1 $ 150,000
Fire Protection L S $ 1 000,000 1 $ 1,500,000
Lighting $ 1,000,000
L S. $ 1:000,000 1 $ 1
Other Costs
Signals L S $ 200,000 1
Signage $ 200,000
L S. $ 100,000 1 $ 100,000
Surface Streets & Improvements
Earthwork C Y $ 1250 8,481 $ 106,013
Rough Grading S Y $ 0.80 12,722 $ 10,178
Fine Grading S Y $ 150 12,722 $
Drainage L S $ 190,000 1 19,083
Surfacing L S $ 1540,897 1 $ 190,000
Curb and Gutter L S $ 30,000 1 $ 540,897
Striping L S. $ 15,000 1 $ 30,000
Signage $ 15,000
L S $ 7,000 1 $ 7,000
Site Furnishings L S $ 481,200 1
Lighting $ 481,200
L S $ 200,000 1 3 200,000
Planting and Irrigation L S $ 80,047 1 $ 80,047
Subtotal $ 17,093,362
30% Oesign Cont'gency $ 5,128,008
10% Construction Contingency $ 1,709,336
Estimated Construction Cost* $ 23.930,706
Estimated Construction Cost does not include Sales Tax, A/E fees, Owner Project
administration cost or construc management cost
City of Bremerton
Transportation Improvement Study
2 -Lane Ferry Exit Lane Tunnel Under First and Pacific
A/E Services Calculation based on Washington State Guidelines Approach
Date: 4/25/02
MACC based on 2002 Dollars $ 22,221,370 00
MACC inflated to Mid -point of Construction in 2005, (2 % /yr) $ 23,581,495 00
A/E Services Calculations:
1) Pre - Design or TS&L Study
Project Management by A/E 75000
Traffic Analysis 50000
Alignment Alternatives Analysis 100000
Utility Investigation 50000
Drainage Investigation 50000
Geotechrncal Investigation 150000
Survey 100000
WSF Terminal Phasing 50000
ROW Procurement 50000
Public /Stakeholder Involvement 50000
Total Pre - Design Services: $ 725,000.00
2) EIS / NEPA / Permitting
Estimate for Fee: $ 661,500 00
3) A/E Basic Design Services.
Consider Tunnel as a Facility with more than average design difficulty
Schedule A rate for MACC at Midpoint of Construction 7%
Consider New Tunnel as an effective "Remodel Project"
Increase rate to account for remodel effect and phasing 2%
Fast Track Design Services 15%
Basic A/E Rate through Construction
Basic A/E Fee through Construction: $ 2,476,057
Total Estimated Fee for A/E Tunnel Design Services": $ 3,862,557
' A/E services do not include City Administration costs, legal costs, Value Engineering,
document reproduction and permitting application fees
NEPA and SEPA Documentation frost Estimate
for the
Ferry Terminal Exit Tunnel and the Bremerton Waterfront Project
by ESA Inc (Environmental Studies and Permit Manager) and Entranco Engineers Inc.
Bremerton Ferry Tunnel EIS
Prelimary Cost Estimate
Labor Hours Average Cost/ Hour Total Cost
TASK 1 SCOPING
Issue Notice to Proceed -
Obtain Existing Data 120 $90 $10,800
Establish Inter - Disciplinary Team (IDT) 40 $150 $6,000
Develop Purpose and Need 40 $110 $4,400
Agency Scoping Meeting 60 $110 $6,400
Public Scoping Open House 120 $110 $13,200
TASK 2 ALTERNATIVE ANALYSIS
Traffic Analysis footnote (1)
Conduct Environmental Inventory 360 $90 $32,400
Develop Conceptual Alternatives footnote (2)
Conduct Altemative Screening 2 20 $110 $24,200
Obtain IDT Approval - Screening -
Decision on Alternatives to Cary Forward -
Public Altemabves Open House 100 $110 $11,000
TASK i PREPARE DISCIPLINE REPORTS
Develop 30% Design on Alternatives to Carry Forward footnote (2)
Transmit Engineering Maps / Information to Env Team -
Engineering for Avoidance / Minimization footnote (2)
Noise Report 450 $110 $49,500
Waterways / Water Qualrty Report 350 $90 $31,500
Wetlands Report 120 $
Fish $10,800
sh and Wildlife Report 120 $90 $10,800
Biological Assessments - ESA Compliance 225 $90 $20,250
Displacements / Relocations Report 260 $90 $23,400
Cultural Resources Report 250 $90 $22500
Socio-economic / Land Use / Environmental Justice Report 300 $90 $27,000
Visual Quality Report 275 $90 $24,750
WSDOT/ FHWA Review of Discipline Reports
Revisions to Discipline Reports 220 $110 $24,200
WSDOT / FHWA Approval of Discipline Reports
TASK 4 PREPARE ENVIRONMENTAL IMPACT STATEMENT
Prepare Predraft EIS 400 $90 $36,000
WSDOT / FHWA Review of Predraft EIS -
Revisions to provide draft EIS 180 $90 $16,200
WSDOT / FHWA Review of draft EIS -
Revisions to provide EIS for public review 120 $90 $10,800
WSDOT / FHWA Approval of EIS for circulation -
EIS Public Hearing 120 $110 $13,200
Public Review of EIS
Consolidate / Review Public Comment/ Response Plan 80 $110 $8,800
WSDOT / FHWA Approval of EIS Comment Response Plan -
Prepare Responses to Comments 120 $110 $13,200
WSDOT / FHWA Review Responses -
FHWA Issue Record of Decision (ROD) -
TASK 5 PROJECT MANAGEMENT / COORDINATION
ESA Project Management and Coordination 700 $100 ,000
Entranco Project Management 700 $150 $ $70$70
Total Labor $626,500
Expenses $35,000
Total Cost $661,500
� t
r
Doc °16-01 12:3Baa NC HM UKAZ; P -61 I P 01/04 F -133
"ft. DWreeer, WA&*.GW*
2467 RAMM Mcu?s Qrggq 9Laxra BUT
WASr04T{SN, DO X51r -3709 _^� A ;W Pwar+t (202) 2285910 PHOR C cm) 80:
Ilttp: Awm house.gmichckv Sur
ire GOMMfTTi L'
vw of t4P ate t t�� S00Paor�ca
APPROPRIATIONS PR� � 4
3UDCOMMIT7EE5 312 E 5th S
I NTERIOR igvi .SP I1f �P�
RAMW4 PoaraMct�es WA DEMQCRAr ,C Mua.ut
DEFENSE P HCNE - (360) 452
MrUTA CONSTRUCTION December 16, 2002
RECYCLED F
The Hon. Cary Bozeman
Mayor
City ofBremerrron
239 4th St
Bremerton, WA 98337 -1812
Dear Mayor Bozeman:
I am writing to update you on the current state of fandding for the tunnel project in
downtown Bremerton.
In the FY 2003 Senate Transportation Appropriations bill, S. 2808, there is a $3 million
earmark for the Bremerron Ferry Exit Tunnel. The earmark is listed on page 164 of the Report
accompanying S. 2088 under Section 330 in Title III — General Provisions_ I have enclosed
copies of the pertinent pages.
There was no similar provision in the House Transportation Appropriations bill.
Congress is expected to complete work on the FY 2003 Appropriations bills, including
Transportation, in January 2003. I am confident that this earma will be contained in the final
version of the Transportation Appropriations bill, although at this time that prediction cannot be
made with absolute certainty. I have been working with Senator Patty Murray —currently the
Chairwoman of the Senate Transportation Appropriations Subcommittee — on this project and we
are continuing our effort to snake sure that this project is funded in the final FY 2003
Transportation Appropriations bill.
I look forward to our continued work on this important project.
Sincerely,
NOPCM DICKS
Member of Congress
F
Pec -16 -01 IZ 38ps From— T -611 P 01/04 F -133
h
Calendar No. 522
107TH CoN?PMS l NATE i RMRT
2d Session J ` 107 -224
DEPARTMENT OF TRANSPORTATION AND RELATED
AGENCIES APPROPRIATIONS BILL, 2003
JULY 26, 2002— Ordarcd to be punted
Mrs MURRAY, from the Committee on Appropriations,
submitted the following
REPORT
[To a=Mpany 8. 28081
The C on Appro riatiams reports the bill (S_ 2808) mak-
ing appropriations for the epartaisnt of Transportation and re-
lated agencies for the fiscal year ending SeptemBer 30, 2003, and
for other purposes, reports favorably thereon and recommends that
the bill do pass.
Amounts of new budget (obligational) authority for fiscal year 2003
Amount of bill as reported to Senate .... ............... $22,251,162,000
Amount of budget estimates, 2003 ................... .... 20,759,680,000
Fiscal year 2002 enacted ..... ............................... 18,900,670,000
81-066 *(Star Prow
1
p ®c -16 —O2 IZ :3B� From—
T -611 P 03/04 F -133
TITLE III -- GENERAL PROVISIONS
The Committee concurs with the general provisions that apply to
the Department of Transportation and related agencies as proposed
in the budget, with some changes, deletions, and additions. These
are noted below:
SEC 304. Modifies a requested provision to prohibit the use of
fide for the salaries and expenses to no more than 100 political
and presidential appointees to the Department of Transportation.
SEC. 316. Modifies a provision regarding the funding of adminis-
trative 8t%enses for the Federal Motor Carrier Safety Administra-
tion and the Federal Highway A mim stratlon.
SEC. 318. Modifies a proviaion regarding funds made available to
Alaska or Hawaii for ferry boats, ferry teruunals and ferry pas-
senger service_
SEC- 320 Includes a provision exemp a general aviation air-
port anth more than 300,000 annual operations from having to ac-
cept scheduled passenger service provided that airport meets spe-
cific conditions.
SEC. 322. Includes a provision periziAting funds from Public Law
106 - 69 and Public Law 106 - 346 for the Wilmington. Delaware
downtown corridor project shall be available for the W
Delaware commuter rail improvements
SEC. 324. Includes a provision transferring the operation and
maintenance of the instrument landing system at the Walnut
Ridge Regional Airport, Arkansas to the Federal Aviation Admnnis.
tratzon.
SEC- 325. Includes a provision transferring the operation and
maintenance of the air t cor_trol tower at W G a t eway
Airport, Arizona to the Federal Aviation AdministratiozL
SEC_ 327 Includes a provision regarding a highway in Alaska -
SEC. 329. Includes a provision which modifies section 1211(1) of
Public Law 105-178 to define the Alameda Corridor East and
Southwest Passage, California high priority corridor.
S EC. 330 - Provides 5160,000,000 to the Secretary of Transpor.
tation to make grants for surface transportation projects The Com-
mittee's recommendation represents a $16,000,000 increase over
the amount that was appropriated in fiscal year 2002 Funds pro-
vided for this program for fiscal year 2003 shall be available for the
following activities.
Ptk^Y Amowar
Aberdeen, Sr) to Genesso ND Rul Repair Project $650,000
Adrlaa's Landing Urban Dt velopineat Roadway ReatiCament
Project, Hartford, CT .... ---- -- --- - 5,000,000
Arkwnght Connector, Spartanburg 3C -- 1,200,000
Aroostook County North -South Highwaya. 51000,000
Basehnc Roud, Isabella, Nottawa, Deerfield, Union, MI ... 1,000,000
Bowling Green Riverfront Project, KY _ -- . _ .. ......... 4,000,000
Bremerton, Ferry Exit Tunnel. WA _ $,000,000
(154)
D ®c -16 -02 12.39pa From- 7-611 P 0 4 104 F -133
155
.i„ic.ou
Broomsfield Wadsworth Intercha e, CO -- - 4,000,000
Caraway Road Overpass Project, Jonesboro AR ... _ _.. „ a,000.000
Cedar Ave Bus Rapid Transit Project, .14N .-_ --- - ........ ._ 3.000,000
Council Bluffs US-6 Study/Prelinunary Design, IA _ 2,000,000
David L. Lawrence Convenbon Center, Rive.fx t Park, 'hma.
burgh, P.A. .. - - -- - - 1,400,000
Dubuque Southwest Arterial, IA ... - - - -- - • 3,000,000
East Clucago, Railroad the Grade �Croanng Qeparatson, IN » - „ , , 3,000,000
Elkhart Underpasa IN .. .. ._ .._ »__. ».... 4.000.000
Parmagton Highwi�y, HI ... - „._�; 11000,000
Genersl ]�Litc cell International Airport Passenger Rail Station,
WI _ ... ... ... .... . . . ..... _-- - _ ........ . . _ .. - . - • 5,000,000
Rani Highway, HI _ _ _ ..... ...._..� .. 1,0001000
I-405 Corridor Tukwila to Lynnwood, WA _.- ..........__ _ 2, 00
5,000
John Wright Drive— Huntsvills. AL ...__ •------ ...... . ,. .... 6,600,000
Juneau Heliport, AK .. _. ._ _....._........._�. ».. -. 21000,000
Lenexa Prairie Star Expressway, HS . - ...._— .. .......... .. » 3.000,000
Matanuska- Susitna Borough road improvements. AK .. 5 000,000
Main, Ave. Bridge & Pede=ian/Bicycle Amenities. Fargo ND 3,000,000
Martin Luther King, Jr Parkway, Den Momes. TA_ -- -_ . «... , �; 5,000.000
Missouri River Trail, ND 2,000,000
Montpelier Downtown Redevelopment Protect, VT ~ - 2,500.000
Old Donunron University Maglev Project, Norfolk. VA .......„ . 2,000.000
Olympic Discovery Vail, WA »_ .-- ._._...... ... -_ 1,000,000
Phalen Blvd. Pmect. St. Paul, MN� ».. ........._....__ ». ». ... ,,.... 5,000,000
Aerre Rail Bypass, SD 6.000,000
Portland, Safety Eahanament. ML . .. . .............. ». _�_ 1,000,000
Route la Truck Bypass Project, Huron, SD ._... __ .._ »_..... , .. 2,260,000
Saddle Road improvements, HI ....... ...... ........... -..,.. ,„.- -- 4.000.000
South & East Beltway System Conatructron, NE ....... ___ —.. „ . 5,000,000
SR 67/605 in Saucier, US _ ». » .. ..........._ _. ----- ._ _....... , 6,000,000
SR- 104/Hood Canal Bridge East Half Replacement, WA 2,000,000
SR.-99 /Alaskan Way Viaduct & Seattle Seawall Rcplutement,
WA_._ ... _ .. ..... ». - -- - - »........... _... . - 2.500,000
St. Louis Major Arterial Road Improvement/R.eaovatma, MO 4,000 000
Trunk Highway 610/10, Twin Cities, MN ... .......... _... .____ ».. 3,000,000
Tucson Railroad Grade Crossing Project. AZ ------ .. ..._ 1,500.000
Tuscaloosa Downtown Revitalization Project, AL .__ _. »»»». __ 5,000,000
Umatilla Interinodal Facility. OR .. .. . . ... ......_ ..... _ - _ 3,800,000
US-14 E!rpansion and Impasise_me_ots, hilt ..... _.. ».•• . •.
2,000,000
US-81 & Highway 30 Arterial Improvements, Columbus, NE ���__„ 2.500,000
U3-93, Westsrdc Mispell Bypas. Project, 34T - __ .. ... ......... . _ 2.500.000
US-95. Worley to Xca, stage 2, ID .............. _. __ ._ ._ .. 7,000,000
WSU Composite Applications for Ferries, WA __ ........ .... - _ 1,000,000
WV Route 9, Jefferson and Berkeley Counties, WV __ - - - -- .. , „ 10,000,000
SEC. 331. Includes a provision direc ing the Secretary of Trans-
portation to approve the use of national highway system and sur-
face transportation funds for construction of noise barriers in Geor-
gia.
SEC. 332. MoMes a provision from the fiscal year 2000 appro-
priations act which prolubits the use of fends in this Act unless the
Secretary of Transportation notifies the House and Senate Commit-
tees on Appropriations not less than 3 full business days before any
discretionary grant award is made under section 3 of Public
Law 107 -178 as amended, and before any award totaling $500,000
or more is announced by the Department or its modal administra-
tions The administration proposed deleting this provision.
SEC. 333 Includes a provision naming buildings at the William
J Hughes Technical Center as the "Frank R. I.autenberg Aviation
Secunty Complex."
Mayor Cary Bozeman
rbolelon0d br
239 Atli Street'
July 28, 2003 i)rernenon, WA 9
Ms Kathleen Davis, Director
WSDOT Highways and Local Programs
P O Box 47390
Olympia, WA 98504 -7390
RE Downtown Pedestrian /BTC Access Improvements,
Request For Approval of Ferry Toll Credits to Match Federal Funding
Dear Ms. Davis
The Downtown Pedestrian /Bremerton Transportation Center (BTC) Access Improvements are
needed to improve ingress and egress from the BTC and relieve the congestion to the City of
Bremerton's urban core environment The need exists currently,- however, the City
revitalization and economic development efforts will further exacerbate the traffic , conflicts
further highlighting the need to separate the ferry traffic from the urban core. '
The plan to resolve these conflicts includes constructing a ferry traffic egress tunnel to eliminate
the significant vehicle /pedestrian conflicts that occur when a ferry unloads vehicles onto
Bremerton's street system. Congress has supported the City's vision with approximate)
million to date, and we are confident that the remaining $ 2113 million will also be provided, either
all in their next budget cycle, or split between the next two. The federal funding summary is
shown in the table below
Federal/ Soft Match
Federal Non - Federal Requested
Section of Law or Funds Match from State
Federal Pro ram A1 ro riations Act Available Re uirement Toll Credit
TEA -21 High Section 1602, TEA -
Priont Funds 21 Authorization Act $4.700,000 80/20
Section 330, $1,175,000
Earmark 2003 Transportation
A ro riations $1,490,250 100/0
Anticipated 0
Earmark or Unknown
SAFETEA High Anticipate
Priorit Funds Anticipated Fundin $21,809,750 80/20
$5,452,438
Total $28,000,000 $6,627,438
® Page 2
July 28, 2003
In addition, the City is partnering with Kitsap Transit to incorporate the Phase C improvements
to the BTC to address operational needs of WSF Although these Phase C improvements are
funded separately through a FTA grant, the projects are integrally related and will be planned,
designed and constructed cooperatively.
The ferry traffic egress tunnel will be under State Route 304 and carry SR 304 outbound traffic.
The design of the improvements is being coordinated with WSDOT through your Olympic
Region Local Programs office, and with the federal government through the FHWA and the
FTA Although the project improves both the state highway and Washington State Ferries
facilities, and directly benefits both highway and ferry traffic, the federal funds shown are
sufficient to meet the current cost estimate and there has been no request for direct WSDOT
financial participation The City needs your assistance, however, to meet the local match
requirements for the $4 7 million funding already in hand, as well as for the remaining $218
million that is coming.
The City is requesting that WSDOT support the project by approving the use of $6 63 million in
Ferry Toll Credits to serve as the required local match for the funds being
Congress Your doing so will boost the City's economic development, make the tate highway
safer for both people and vehicles, help the ferries operate more e
schedule, and make being a pedestrian in Bremerton pleasant again. ffectively and unload on
If you have questions, or need additional information regarding this request, please contact me
or Gene Sampley, Director of Public Works & Utilities Thank you for your consideration of this
request; we look forward to your favorable reply.
Sincerely,
l
Cary Bozeman
Mayor, City of Bremerton
cc
W Eugene Sampley, Director of Public Works & Utilities Department, City of Bremerton
Gary Sexton, Director of Economic Development, City of Bremerton
i
F
� AGENDA BILL
BREMERTON CITY COUNCIL
1. SUBJECT: PSA with kpff. FOR AGENDA OF: February 19, 2003
CONSULTING ENGINEERS for the ORIGINATING DEPT: Public Works & Utllitl �,/
DOWNTOWN PEDESTRIAN/BTC ORIGINATOR: W. Eugene Sampley, Director7z,r�
ACCESS IMPROVEMENT DATE SUBMITTED: February 6, 2003
2. CLEARANC (Comment on back if-r C =ssar4 ) 3. EXFIIBITS:
1. Professional Services Agreement
C DtrCCftx - e 4 nn 2Muc.12evelonment
dt� ttomey
Dir . r inance ,
Cou 1 al & Budget Committee
Coun it Operations Committee
ENDORSE T TION [ j APPROVED BY CO C ID
MAYOR
� TTAL:
X
COUNCIL PRESIDEN
4. SUMMARY AND REQUIREMENT FOR COUNCIL ACTION
Federal transportation funds have been earmarked for a project to improve both commuter traffic with the Bremerton
Transportation Center (BTC) and pedestrian access and safety within downtown Bremerton The City of Bremerton has
been identified as the lead agency for this project. To meet City, State and Federal environmental review requirements a
screening analysis is needed to identify a preferred alternative prior to completion of the environmental permitting
process Through a formal consultant selection process kpff Consulting Engineers was selected to perform this
screening analysts It is recommended the City Council approve a Professional Service Agreement with kpff Consulting
Engineers to perform the screening analysis for the Downtown Pedestnan/BTC Access Improvement Project in the
amount of $99,731.00
S. RECOMMENDATION•
The City Council approve the Professional Services Agreement with kpff Consulting Engineers to perform the screening
analysis for the Downtown Pedestrian/BTC Access Improvement in the amount of $99,731 00 and authorize the Mayor to
execute the same
9. RESPONSIBLE OFFICIAL: Director Pub Wks & Util
ENFORCEMENT OFFICIAL: Director Economic Devl
EXPIRATION DATE:
REVIEW DATE:
10. NOTWE OF ACTION
PULLED [ j TABLED [ ] APPROVED [ ] DISAPPROVED [ I AMENDED ( ]
COUNCIL DIRECTIVE:
1 6
(OVER) 11. AGENDA BILL NO.: 03 oa ` )
1c,
DATE SUBMITTED Jub 15, 2003
AGENDA BILL BILL
CI3 Y OF BREMERTON
CITY COUNCIL 8C
Bag a aaaaaa aeaaawaaaaaaaasaauaaaaa w a mamas aa News aaoaaa mum aaaoaa MORE aasaaau aai
SUBJECT: Professional Services Committee Meeting Date July 22, 2003
Agreement - Design of Downtown COUNCIL MEETING Date July 30, 2003
Pedestnan/BTC Access Improvements Department PW &U ---
Presenter Gene Sam plev
Phone 5315
SUMMARY: As a consequence ofBremerton's Downtown economic development efforts, the City
needs to reroute exiting ferry traffic through its downtown core and has secured federal funding for
the design of the Downtown Pedestnan/BTC Access Improvements Exeltech Consulting Inc, has
been selected from qualified engineering firms to provide engineering and environmental consulting
services for this project and a professional services agreement (PSA) has been negotiated for the
required services for Design of Downtown Pedestrian/BTC Access Improvements in the amount of
$3,885,804 with a Management Reserve of $39,888 for a total authorized amount of $3,925,692 00 It
is recommended City Council approve execution of the attached PSA
ATTACHMENTS:
(1) Project Summary
(2) Professional Services Agreement
FISCAL ]IMPACTS (Include Budgeted Amount) This project is included in the 2003 amended
budget
APPROVALS:
DEPARTMENT DIRECTOR
CITY ATTORNEY - _ ''-
ECON DEV DIRECTOR
FINANCE DIRECTOR
MAYOR '
ti
FISCAL/BUDGET
OPERATIONS S SesS r CONSENT AGENDA ❑
COUNCIL PRESIDENT 2 : CG"�!:�
RECOMMENDED MOTION: I move that City Council approve the Professional Services
Agreement with Exeltech Consulting Inc for Design of Downtown PedestrianBTC Access
Improvements for a total authorized amount of $3,925,692 00 and authorize the Mayor to finalize and
execute the same
J-
� 1
DATE SUBMITTED March 10
AGENDA RILL BILL #
- CITY OF 13REMERTON
rarrrsrarrsorsrarrrrarrrararrraarersra CITY COUNC
am ar...rrr ,MEN .aa.aa..r.r.
SUBJECT: Local Agency Standard Committee Meeting Date March 16, 2004
Consultant Agreement for the Downtown COUNCIL MEETING Dare
Pedestrian/BTC Access Improvement Project Department 24, D004
ePartment Economic Dev_
Presenter Gary Sexton
Phone 5282
SUMMARY: The City requires project management assistance for the Downtown Pedestrian/gTC
Access Improvement Project Retaining the services of W Eugene Sampley dba Sampley Consulting
to manage the project will provide the expertise necessary to maintain project continuity,
schedule A Local Agency Standard Consultant Agreement for federally funded projects has en d
negotiated with Sampley Consulting for the Downtown Pedestrian/BTC Access Improvement Project
for a total authorized amount not to exceed $50,000 It is recommended that City Council
attached Local Agency Standard Consultant Agreement with Sampley Consulting. approve the
ATTACHMENTS: Local Agency Standard Consultant Agreement with Sampley Consulting for the
Downtown Pedestrian/BTC Access Improvement Project
MCAL M PACTS (include B'Ydgeted Amouut), n0-3-e WTvices are rei tom federal
funds provided in the capital project budget. No local match is required for this contract.
APPROVALS:
DEPARTMENT DIRECTOR.
CITY ATTORNEY:
MAYOR:
FISCAL/BUDGET-
OPERATIONS.
', -- -�
COUNCIL PRESIDENT
RECOMMENDED MOTION: City Council approves the Local Agency Standard Consultant
Agreement with Sampley Consulting for the Downtown Pedestrian/BTC Access Improvment
in the amount not to exceed $50,000 and authorize the Mayor to finalize and execute he same Project
AGENDA STATUS:
Consem
New Busaness
Old Buses
COUNCIL ACTION ❑ Approve Deny (l Pos tpone �"'
std ❑ No Action Resolution
Public Heann
1nf�rmahan
AGREE NT DC -00732
This AGREEMENT, made and entered into this sr
2002, by and between the STATE OF WASHINGTON, Departme
ent of a
acting b
and through the Secretary of Transportation, hereinafter called the "STATE", and the City of
Bremerton, 3027 Olympus Drive, Bremerton, Washington 98 310 -4799, acting through the
Mayor, hereinafter called the "CITY"
WHEREAS, the CITY has a project on SR 304 entitled Transportation Improvement
Project Stage 1B- Gateway, a portion of which is on a limited access facility within the CITY
Limits, hereinafter referred to as the "Facility ", and
WHEREAS, by virtue of RCW 47.52.090, the STATE has full Jurisdiction,
responsibility, and control to and over the Facility, and
WHEREAS, the CITY wishes to assume maintenance responsibility for items on the
STATE's Facility.
NOW THEREFORE, by virtue of RCW 47 28 140 and in consideration of the terns,
conditions, covenants, and performances contained herein, or attached and incorporated and
made part hereof,
IT IS MUTUALLY AGREED AS FOLLOWS-
I
GENERAL
1.0 The CITY agrees to assume maintenance responsibility for all items identified as
CITY responsibility in Exhibit "A ", attached hereto and b
AGREE Y reference made a part of this
~NT All maintenance by the CITY shall occur at no cost to the STATE, with the
exception of maintenance of the limited access fence, which shall be maintained by the CITY at
STATE expense The STATE agrees to assume maintenance responsibility, including cost to
maintain, for all items identified as STATE responsibility in Exhibit "A"
II
PAYMENT
20 The STATE, in consideration of the faithful erfo
by the CITY, agrees to reimburse the CITY for the actual directnand related i to ct done
incurred in the maintenance of the limited access fence These rect costs
payments are not to be more
9
frequent than one (1) per month
21 Reimbursement to the CITY for costs associated with signal maintenance will be
provided for under separate agreement GM -01326
III
UTILITIES
30 The STATE shall be the permitting authority for all future installations of utility
facilities, other than CITY utility installations The CITY shall be the permitting authority for all
CITY utility installations The CITY agrees to provide to the STATE copies of all existing
utility installations within the boundaries of this limited access Facility The CITY also agrees to
provide to the STATE copies of as -built plans of all future CITY utility installations located
within this limited access Facility
1V
RIGHT OF ENTRY
40 The STATE hereby grants and conveys to the CITY the right of entry upon all
land which the STATE has interest, within or adjacent to the right of way to the highway, for the
purpose of maintaining the aforementioned items or for the construction of future CITY utilities
on the STATE's Facility
V
LEGAL RELATIONS
50 Each of the parties shall protect, defend, indemnify, and save harmless the other
party, its officers, officials, employees, and agents, while acting within the scope of their
employment as such, from any and all costs, claims, judginent, and /or awards of damages,
arising out of, or in any way resulting from, each of the party's negligent acts or omissions. No
party will be required to indemnify, defend, or save harmless the other party if the claim, suit, or
action for injuries, death, or damages is caused by the sole negligence of the party Where such
claims, suits, or actions result from concurrent negligence of the parties, the indemnity
provisions provided herein shall be valid and enforceable only to the extent of the party's own
negligence Each of the parties agrees that its obligations under this subparagraph extend to any
claim, demand, and/or cause of action brought b
agents For this purpose, each of the parties, by mutual t negotiat i tiion he eb waives, employees or
to each of the other party only, any immunity that would otherwise be available against such
claims under the Industrial Insurance provisions of Title 51 RCW In the event that any of the
parties or combination of the parties incurs anyjudgment, award, and/or cost ansmg therefrom,
including attorneys' fees, to enforce the provisions of this Section, all such fees, expenses, and
costs shall be recoverable from the responsible party or combination of the parties to the extent
of that party's /those parties' culpability
51 In the event that any party deems it necessary to institute legal action or
proceedings to enforce any right or obligation under this AGREEMENT, the parties hereto agree
that any such action or proceedings shall be brought in a court of competent jurisdiction situated
in Thurston County, Washington.
IN WITNESS WHEREOF, the parties hereto have executed this AGREEMENT as of the
day and year first above written
CITY OF BREMERTON STATE OF WASHINGTON
DEPARTMENT OF TRANSPORTATION
B �
y By
Mayor Jerald R. alter
Asst. Region Administrator for Operations
Date. ,p� �� Date* l
/ D7/
APPROVED AS TO FORM
By,
City ttorney
Date L l,�_
i
DC -00732
Exhibit "A"
City /, Maintenance Responsi . b i iities
Maintenance Item Responsible Agency
Roadway Surface State
Curbs State
Directional Signs/Route Markers State
Signals
(Navy Yard Rd. and Farragut St) State
Stability of Cut & Fill Slopes City
Sidewalks City
Stone Sewers City
Snow Plowing City
Sanding & De -icing City
Snow Removal City
Sand Removal City
Channelization City
C1`08 swalk!3 (
Striping City
Parking Signs City
Regulatory Signs City
Stop Signs
(Intersecting Streets) City
Illummation
(Including Operational Service Billings) City
Street Cleaning City
Street Sweeping City
Landscaping/Vegetation City
Imgation City
Noxious Weeds City
R/W Encroachments City
R/W Cleanup City
Limited Access Fence City
1 j
Washington State
Department of Transportation regime Loca� Agency A
g
Agency City of Bremerton CFDA No. 20 205
[(Catalog of Federal Domestic Assistance)
Address 3027 Olympus Dnve Project No H — $ (;!)Zq
Bremerton, WA 98310
Agreement No
1 For OSC WSDOT Use Only
The Local Agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U S Code Highways, (2) the regulations issue
pursuant thereto, (3) Office of Management and Budget Circulars A -102, A -87 and A -133, (4) the policies and procedures promulgated by the Washington State
Department of Transportation, and (5) the federal aid project agreement entered into between the State and Federal Government, relative to the above project, the
Washington State Department of Transportation will authorize the Local Agency to proceed on the project by a separate notification Federal funds which are to be
obligated for the project may not exceed the amount shown herein on line r, column 3, without written authority by the State, subject to the approval of the Federal
Highway Administration All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency
Project Description
Name Downtown Pedestnan/BTC Access Improvement Length 0 53 miles
Termini Warren Ave & Burwell Street Intersection to B Ferr Te rminal _
Description of Work
The project consists of improvements for pedestrian and vehicular access, within the downtown Bremerton core, to the
Bremerton Transportation Center (BTC) at the ferry terminal The project includes a potential ferry exit tunnel, roadway
reconstruction and realignment, transit enhancements,channelization, signalization, sidewalk and streetscape
improvements, illumination, landscaping and drainage improvements
Estimate of Funding
Type of Work (A) _ ,. M
Estimated Total Estimated Agency 43 �
Protect Funds 9 cY Estimated
PE a Agency 500,000 00 Funds Federal Funds
80 % b Other Consultants 3,100,000 00 100,000 00 400,000 00
Federal Aid
c Other
620,000 00 2,480,000 00
d State 150 000 00
Participation 30,000 00 120,000 00
Ratio for PE a Total PE Cost Estimate a +b +c +d 3,750,000.00 750,000.00
Right of Way f Agency 3,000,000.00
Other
Federal Aid h Other
Participation i State
Ratio for RW Total R/W Cost Estimate f+ +h +i
Construction k Contract
I Other
M Other
n Other
% o Agenc
Federal Aid
Participation State
Ratio for CN rt Total CN Cost Estimate k +l +m +n +o+
r Total Protect Cost Estimate (e +) +q) 3,750,000.00 750 000.00
3,000,000.00
Agency Official Washington State Department of Transportation
By By
Title _Cary Brizernan istant Secretary for Highways and Local Programs �
Mayor, City of )ate Executed
Bremerton APR 1 4 2003
��
Construction Method of Financirig (Check Method Selected)
State Ad and Award
❑ Method A - Advance Payment - Agency Share of total construction cost (based on contract award)
❑ Method B - Withhold from gas tax the Agency's share of total construction cost (line 4, column 2) In the amount of
$ at $ per month for months
Local Force or Local Ad and Award
® Method C - Agency cost Incurred with partial reimbursement
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as
condition to payment of the federal funds obligated, it accepts and will comply with the applicable provisions set fora
below Adopted by official action on
NA , Resolution /Ordinance No
Provisions
Scope of Work 1 Preliminary engineering
The Agency shall provide ail the work, labor, materials, and services necessary 2 Right of way acquisition
to perform the project which is described and set forth in detail in the "Project 3 Project const: uct.on
Description" and 'Type of Work."
When the State acts for and on behalf of the Agency, the State shall be deemed In the event that right of way acquisition, or actual construction of the road, for
an a
When th the t A gency and shall perform the services described and inducted a which preliminary engineering is undertaken is not started by the closing of the ten
g g y fiscal year following the fiscal year m which the agreement is executed, the Agent
`Type of Work" on the face of this agreement, in accordance with plans and
specifications as proposed by the Agency and approved by the State and the will repay to the State the sum or sums of federal funds paid to the Agency under t
Federal Highway Administration terns of this agreement (see Section DQ
When the State acts for the Agency but is not subject to the right of control by The Agency agrees that all stages of construction necessary to provide the initial
the Agency, the State shall have the right to perform the work subject to the planned complete facility within the limits of this project will conform to at least th
ordinary procedures of the State and Federal Highway Administration nrim mium valu approved statewide design standards applicable to this clan
t �8!h s h a&tt"h'at n� =;pia li €taimed wtihout Jt.&,t ad
It 1�ioyatlon of Authority prart�iy�itz�
The
the adm tale i
t w i l lin g this ful t res ponsibilities Agency to the Federal Government by The Agency agrees that on federal aid highway construction projects, the current
project The agrees that the State shall have the federal aid regulations which apply to liquidated damages relative to the basis of
full authority to carry out this administration The State shall review, process, and federal participation in the project cost shall be applicable in the event the contracts
approve documents required for federal aid reimbursement in accordance with fails to complete the contract within the contract time
federal requirements If the State advertises and awards the contract, the State
will further act for the Agency in all matters concerning the project as requested V1 Payment and Partial Reimbursement
by the Agency If the Local Agency advertises and awards the project, the State The total cost of the project, including all review and engineering costs and
shall review the work to ensure conformity with the approved plans and other expenses of the State, is to be paid by the Agency and by the Federal
specifications Government Federal funding shall be in accordance with the Transportation
Ill. Project Administration Equity Act for the 21st Century (TEA 21), as amended, and Office of
Management and Budget circulars A -102, A -87 and A -133 The State shall not
Certain types of work and services shall be provided by the State on this bo ultim responsible responsible for any of the costs of the project. The Agency shall be
project ect as requested b the Agency and described in the Type of Work above In Y for all costs associated with the project which are not
addition, the State will furnish qualified personnel for the supervision and reimbursed by the Federal Government Nothing in this agreement shall be
inspection of the work in progress On Local Agency advertised and awarded construed as a promise by the State as to the amount or nature of federal
projects, the supervision and inspection shall be limited to ensuring all work is in participation in this project
conformance with approved plans, specifications, and federal aid requirements The Agency shallbill the state for federal aid project costs incurred in conformity
The salary of such engineer or other supervisor and all other salaries and costs With applicable federal and state laws The agency shall mimimize the time elapsed
incurred by State forces upon the project will be considered a cost thereof All between receipt of federal aid funds and subsequent payment of Incurred costs
costs related to this project incurred by employees of the State in the customary Expenditures by the Local Agency for maintenance, general administration,
manner on highway payrolls and vouchers shall be charged as costs of the supervision, and other overhead shall not be eligible for federal participation unless
project
an indirect cost plan has been approved by WSDOT
IV Availability of Records The State will pay for State incurred costs on the project Following
All project records in support of all costs incurred and actual expenditures payment, the State shall bill the Federal Govemment for reimbursement of
kept by the Agency are to be maintained in accordance with local government those costs eligible for federal participation to the extent that such costs are
accounting procedures prescribed by the Washington State Auditor's Office, attributable and properly allocable to this project The State shall bill the
the U S Department of Transportation, and the Washington State Department Agency for that portion of State costs which were not reimbursed by the
of Transportation The records shall be open to inspection by the State and Federal Government (see Section DQ
Federal Government at all reasonable times and shall be retained and made
available for such inspection for a period of not less than three years from the 1_ Project Construction Costs
final payment of any federal aid funds to the Agency Copies of said records Project construction financing will be accomplished by one of the three
shall be furnished to the State and /or Federal Government upon request methods as indicated in this agreement
V Compliance with Provisions
The Agency shall not incur any federal aid participation costs on any
classification of work on this project until authorized in writing by the State for
each classification The classifications of work for projects are
Method A — The Agency will place with the Staic, within (20) days after the
X. Traffic Control, Signing, Marking, and Roadway
execution of the construction contract, an advance in the amount of the
Agency's share of the total construction cost based on the contract award The Maintenance
State will notify the Agency of the exact amount to be deposited with the State The Agency will not permit any changes to be made in the provisions for parks
The State will pay all costs incurred under the contract upon presentation of regulations and traffic control on this project without prior approval of the State a
progress billings from the contractor Following such payments, the State will Federal Highway Administration The Agency will not install or permit to be
submit a billing to the Federal Government for the federal aid participation installed any signs, signals, or markings not in conformance with the standards
share of the cost When the project is substantially completed and final actual approved by the Federal Highway Administration and MUTCD The Agency wil
costs of the project can be determined, the State will present the Agency with a at its own expense, maintain the improvement covered by this agreement
final billing showing the amount due the State or the amount due the Agency
This billing will be cleared by either a payment from the Agency to the State or XI. Indemn
by a refund from the State to the Agency
The Agency shall hold the Federal Government and the State harmless from an
Method B — The Agency's share of the total construction cost as shown on shall process and defend at its own expense all claims, demands, or suits, whether
the face of this agreement shall be withheld from its monthly fuel tax law or equity brought against the Agency, State, or Federal Government, arising
allotments The face m this agreement establishes the months u which the from the Agency's execution, performance, or failure to perform any of the
al lotmen t s shall take place and the exact amount to be withheld each month provisions of this agreement, or of any other agreement or contract connected Witt
The extent withholding will be confirmed o letter from the State h the time this agreement, or arising by reason of the participation of the State or Federal
of contract award Upon receipt of progress billings from the contractor, the Government in the project, PROVIDED, nothing herein shall require the Agency i
State will submit such billings to the Federal Government for payment of its reimburse the State or the Federal Government for damages arising out of bodily
participating portion of such billings injury to persons or damage to property caused by or resulting from the sole
negligence ence of the Federal Government or the State
Method C — The Agency may submit vouchers to the State in the format No liability shall attach to the State or Federal Government except as expressly
prescribed by the State, in duplicate, not more than once per month for those provided herein
costs eligible for Federal partic to the extent that such costs are direLtly Xli. Nondiscrimination Provision
attributable and properly allocable to this project Expenditures by the Local The Agency
Agency for maintenance, general administration, supervision, and other g cY shall not discriminate on the basis a race, color, national origin, or
overhead shall not be eligible for Federal participation unless claimed under a sex in the award and performance of any USDOT or contract and/or
previously approved indirect cost plan agreement or in the administration of its DBE program or the requirements of 49
CFR Part 26 The Agency shall take all necessary and reasonable steps under 49
The State shall reimburse the Agency for the Federal share of eligible project CFR Part 26 to ensure nondiscrimination in the award and administration of
costs up to the amount shown on the face of this agreement At the time of USDOT- assisted contracts and agreements The WSDOT's DBE program, as
audit, the Agency will provide documentation of all costs incurred on the required by 49 CFR Part 26 and as approved by USDOT, is incorporated by
project reference in this agreement Implementation of this program is a legal t3 obligation
Th ate bha1l ball thug iivY fur lilt ttss ;itr t,nd ]r rile htat rurstiroi tto and failure to carry out its terms shall be treated as a violation of this agreement.
ills rr �L• rid-Saute also bill di&A iui€s r { lsrin rititiflt�tioii tftilia Aegneq of its ti, tarty iiUt 'ft§alsprtitietY�irogtain,the
g Y .w tli�r feLercat fun t +d ptu 1 t6ti[ rnity tri,polL, Na irr tttiii� litvirtietf fiir�under itt P #ranrl ina ,
the State to the Agency for project costs which are subsequently determined to appropriate cases, refer the matter for enforcement under 18 U S C 1001 and /or the
be ineligible for federal participation (see Section DQ program Fraud Civil Remedies Act of 1986 (31 U S C 3801 et seq )
VII Audit of Federal Consultant Contracts
The Agency, if services of a consultant are required, shall be responsible for The Agency hereby agrees that it will incorporate or cause to be incorporated into
audit of the consultant's records to determine eligible federal aid costs on the any contract for construction work, or modification thereof, as defined in the rules
project The report of said audit shall be in the Agency's files and made and regulations of the Secretary of Labor in 41 CFR Chapter 60, which is paid for in
available to the State and the Federal Government whole or in part with funds obtained from the Federal Govemment or borrowed on
An audit shall be conducted by the WSDOT Internal Audit Office in the credit of the Federal Government pursuant to a grant, contract, loan, insurance,
accordance with generally accepted govemmental auditing tandards as c guarantee , i undc nsurance, or insurance, or g g uarantee, the require pursuant to any federal p
g contract, loan, rogram involving such grant,
issued by the United States General Accounting Office by the Comptroller d contract provisions for
Federal -Aid Contracts
General of the United States, WSDOT Manual M 27 - 50, Consultant Guidelines (FHWA 1273), located in Chapter 44 of the Local Agency
Authorization, Selection, and Agreement Administration, memoranda of
understanding between WSDOT and FHWA, and Office of Management The Agency further agrees that it will be bound by the above equal opportunity
and Budget Circular A -133 clause with respect to its own employment practices when it participates in
If upon audit it is found that overpayment or participation of federal pa ticipat ng is a State or Local Government, th above equal opportunity clause
money in ineligible items of cost has occurred, the Agency shall reimburse is not applicable to any agency, instrumentality, or subdivision of such
the State for the amount of such overpaynent or excess part.cipatign (see gc N emment which does not participate in work on or under the contract
Section DQ
VIII. Single Audit Act The Agency also agrees
The Agency, as a subrecipient of federal funds, shall adhere to the federal (1) To assist and cooperate actively with the State in obtaining the compliance of
Office of Management and Budget (OMB) Circular A -133 as well as all contractors and subcontractors with the equal opportunity clause and rules,
applicable federal and state statutes and regulations A subrecipient who regulations, and relevant orders of the Secretary of Labor
expends $300,000 or more in federal awards from all sources during a given
fiscal year shall have a single or program - specific audit performed for that (2) To fumish the State such information as it may require for the supervision of
year in accordance with the provisions of OMB Circular A -133 Upon such compliance and that it will otherwise assist the State in the discharge of its
conclusion of the A -133 audit, the Agency shall be responsible for ensuring primary responsibility for securing compliance g
that a copy of the report is transmitted promptly to the State (3) To refrain from entering into any contractor contract modification subject to
IX Payment of Billing Executive Order 11246 of September 24, 1965, with a contractor debarred from, or
The Agency agrees that if yment p a who has not demonstrated eligibility for, government contracts and federally
the State's billing relative to the project t arrangement for payment (e g ,State force work, project any of assisted construction contracts pursuant to the Executive Order
cancellation, overpayment, cost ineligible for federal participation, etc ) is not (4) To carry out such sanctions and penalties for violation of the equal
shal of he total sum due f om the regular monthly fuel State, Federal H ighway may Administration, imposed upon contractors and subcontractors by the
g y y ministration, or the Secretary of Labor pursuant to Part
tax allotments to the Agency from the Motor Vehicle Fund No additional II, subpart D of the Executive Order
Federal project funding will be approved until full payment is received unless o
otherwise directed the Assistant Secretary for Highways and Local Programs
I 1
In addition, the Agency agrees that if it fails or refuses to comply with these XV. Venue for Claims and /or Causes of Action
undertakings, the State may take any or all of the following actions For the convenience of the parties to this contract, it is agreed that any claims
(a) Cancel, terminate, or suspend this agreement in whole or in part, and/or causes of action which the Local Agency has against the State of
Washington, growing out of this contract or the project with which it is
(b) Refrain from extending any further assistance to the Agency under the concerned, shall be brought only in the Supenor Court for Thurston Coun
program with respect to which the failure or refusal occurred until satisfactory ty
assurance of future compliance has been received from the Agency, and XVI. Certification Regarding the Restrictions of the Use
(c) Refer the case to the Department of Justice for appropriate legal proceedings of Federal Funds for Lobbying
The approving authority certifies, to the best of his or her knowledge and belie
XIII. Liquidated Damages that
The Agency hereby agrees that the liquidated damages provisions of 23 CFR (1) No federal appropriated funds have been paid or will be paid, by or on beh
of the undersigned, to any person for influencing or attempting to influence an
Part 630, Subpart 305, as supplemented, relative to the amount of Federal officer or employee of any federal agency, a member of Con
participation in the project cost, shall be applicable in the event the contractor gress, an officer or
fails to complete the contract within the contract time Failure to include employee of Congress, or an employee of a member of Congress in connection w
liquidated damages provision will not relieve the Agency from reduction of the awarding of any federal contract, the making of any federal grant, the making
federal participation in accordance with this paragraph any federal loan, the entering into of any cooperative agreement, and the extensioi
continuation, renewal, amendment, or modification of any federal contract, grant,
XIV Termination for Public Convenience loan, or cooperative agreement.
The Secretary of the Washington State Department of Transportation may (2) If any funds other than federal appropriated funds have been paid or will be
terminate the contract in whole, or from time to time in part, whenever paid to any person for influencing or attempting to influence an officer or employe
(1) The requisite federal funding becomes unavailable through failure of of any federal agency, a member of Congress, an officer or employee of Congress,
g or an employee of a member of Congress in connection with this federal contract,
appropriation or otherwise grant, loan, or cooperative agreement, the undersigned shall complete and si.brrit
(2) The contractor is prevented from proceeding with the work as a direct the Standard Form - LLL, "Disclosure Form to Report Lobbying," in accordance
result of an Executive Order of the President with respect to the prosecution of with its instructions
war or in the interest of national defense, or an Executive Order of the (3) The undersigned shall require that the language of this certification be
President or Governor of the State with respect to the preservation of energy included in the award documents for all subawards at all tiers (including subgrants
resources and contracts and subcontracts under grants, subgrants, loans, and cooperative
(3) The contractor is prevented from proceeding with the work by reason of agreements) which exceed $100,000, and that all such subrecipients shall certify
a preliminary, special, or permanent restraining order of a court of competent and disclose accordingly
junsdiction where the issuance of such order is primarily caused by the acts or This certification is a material representation of fact upon which reliance was
omissions of persons or agencies other than the contractor placed when this transaction was made or entered into Submission of this
rxr:rficatian as a riv equi5itp for - -ranking, or r wto this. tnr,;netion +ii np%WaI
(d) The Secretary determines that such termination is fn the best interests of (ay ri�stt4r l 5�, T,itFp l l ` l I S i't# Any t s skhA fa t;t fls th; resluRd
the State
certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure
Additional Provisions
i
Aug 25 04 03:27p En Peering Division 3C 1 478 -5398 p,3
AW Washingion Stage Olympic Region Headquarters
Department of Transportation 5720 Capitol Boule ✓ard, Tumwater
Douglas D. MacDonald P O Box 47440
Secretary of Transportation Olympia, WA 98504 7440
360 - 357 -2600
Fax 360 - 357 -2601
TTY 1 -800- 833 -6388
Ymv wsdot wa gov
August 10, 2004
Mayor Cary Bozeman
City of Bremerton
239 Fourth Street
Bremerton, WA 98337
Re SR 304 Downtown Bremerton Pedestrian / BTC Access Improvements
Letter of Understanding — LA -5522
Dear Mayor Bozeman
The purpose of this Letter of Understanding is to clarify operational details in implementing
Secretary Douglas B McDonald's July 13, 2004 lettei (attached) which notified the City of
Bremerton of WSDOT's management responsibilities in association with the SR 304
Downtown Bremerton Pedestrian / BTC Access Improvement project
More specifically this letter of understanding defines the approval authority for project design,
environmental documentation, right -of -way acquisition and construction Additional
considerations maybe addressed prior to initiation of a construction phase
The Washington State Department of Transportation, hereinafter called the "State ", an_d the
City of Bremerton, hereinafter called the "City ", in an effort to avoid any unnecessary delay in
the current project schedule, concur in the following
1 The State and City have designated formal points of contact
(State contact) (City contact)
Neal J Campbell, P E, Local Programs Engineer Phil Williams, Director
WA State Department of Transportation Department of Public Works & Utilities
P O Box 47440, Olympia, WA 98504- 7440 3027 Olympus Drive
5720 Capitol Boulevard Bremerton, WA 98310
Tumwater, WA 98501 (360) 473 -5315
(360) 357 -2666 FAX (360) 473 -5018
FAX (360) 798 -2740
2 The City recognizes and accepts the State's authority to "exercise all the powers and
perform all the duties necessary, convenient, or incidental to the planning, locatins.
Aug 25 04 03:27p En s neering Division 3F"- 478 -5398 p•4
designing, constructin g, improving, repairing, operating, and maintaining [of] state
highways" including the SR 304 Downtown Bremerton Pedestrian / BTC Access
Jinprovement project And in that recognition the City accepts the State as the final
approving authority for all project elements in the current and future phases of design,
environmental documentation, nght -of -way acquisition and construction
3 The City and State agree that in order to avoid delays by canceling and re- establishing
existing financial agreements (LA -5522) and previously executed consultant contracts,
the City shall continue in the role of the project financial administrator
4 The City extends to the State, authority to direct agents of the City employed in the
design, environmental documentation, or right -of -way acquisition processes, associated
with this project
It is the desire of the City and State to continue working cooperatively towards the completion
of this project -
Signature below constitutes concurrence of both parties in this Letter of Understanding
City of Bremerton State of Washington
Department of Transportation
By B 14Z Y
Cary Boze an, Randall A. Hain, P E
Mayor Region Administrator
Date �d" e5 Date 3 • 0 4
C Neal J Campbell, P E, Local Programs Engineer
Phil Williams, City Director of Public Works & Utilities
Gene Sampley, P E , City Project Manager
t �
s
1
2 RECEIVED FOR FILING
3 KITSAP COUNTY CLERK
AUG 2 6 2004
4 DAVI1) W P -
�TERSON
5
6
7
8 IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON IN AND FOR
9 KITSAP COUNTY, WASHINGTON
10 _>
11 DELL KNAUSS, Case No 04 -2- 02001 -0
Petitioner,
12 v
DECLARATION OF SERVICE
13 THE CITY OF BREMERTON and CITY
14 COUNCIL OF BREMERTON,
Respondents
15
16 I am the Legal Assistant for the Bremerton City Attorney's Office On the 26th day
17 of August, 2004, and in the manner indicated below, I caused a copy of the City of
18 Bremerton's Notice of Appearance, Motion for Change of Judges, Affidavit of Prejudice
19 by Roger A Lubovich in Support of City of Bremerton's Motion for Change of Judge,
20 Answer and Affirmative Defenses to Petition for Writ of Mandate, Opposition to Petition
21 for Writ of Mandate, Declaration of Randall A Hain, P E, WSDOT, Declaration of David
22 P Horton, and this Declaration of service to be served on
23 Walter M Hackett, Jr
423 Pacific Avenue, #202
24 Bremerton, WA 98337
25 [ ] By United States Mail
26 [ ] By Legal Messenger
[X] By Hand Delivery
[ ] By Facsimile
DECLARATION OF SERVICE - 1 ROGER A LU13OVICH
BREMERTON CITY ATTORNEY
239 4th Street, Bremerton, Washington 98337
Phone 360 -473 -2345 Fax 360 -473 -5161
l
r* I
1 I declare under penalty of penury under the laws of the State of Washington that
2 the foregoing is true and correct
3 Executed at Bremerton, Washington this 26th day of August, 2004
4
n
6 Thelma Swem, Legal Assistant
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
DECLARATION OF SERVICE - 2 ROGERA LUBOVICH
BREMERTON CITY ATTORNEY
239 4th Street, Bremerton, Washington 98337
Phone 360 -473 -2345 Fax 360 -473 -5161
�r
v
1
2
3
4
5
6
7
8 IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON IN AND FOR
9 KITSAP COUNTY, WASHINGTON
10
11 DELL KNAUSS, Case No 04 -2- 02001 -0
Petitioner,
12 v RESPONDENTS ANSWER AND
AFFIRMATIVE DEFENSES TO 13 THE CITY OF BREMERTON and CITY PETITION FOR WRIT OF
14
COUNCIL OF BREMERTON, MANDATE
Respondents
15
16 ANSWER
17 Respondents, the City of Bremerton, and the Bremerton City Council Answers
18 Petitioner's Petition for Writ of Mandate, pursuant to RCW 7 16 200 as follows
19 1 Paragraphs Admitted
Respondents admit the allegations contained in paragraphs I, II, III, V, VI, VII of
20 the petition
21 2 Paragraphs Denied
22 Respondents deny the allegations contained in paragraph IV of the petition
23 AFFIRMATIVE DEFENSES
1
24 The subject matter of the initiative petition is not a valid
25 2 The issue of whether the initiative should be submitted to a vote of the
people is moot
26 WHEREFORE, having fully answered the Petition, Respondents pray as follows
ANSWER AND AFFIRMATIVE ROGER A LUBOVICH
DEFENSES-1 BREMERTON CITY ATTORNEY
239 4th Street, Bremerton, Washington 98337
Phone 360- 473_71d1; F,,, z4n A71 c, G
e
I 1 That the Petition be dismissed
2 2 That Respondents be awarded its costs and attorney's fees incurred
3 herein
4 3 For such other and further relief as the Court deems appropriate
ROGER A LUBOVICH
5 Bremerton City Atto y
6 /
7 By
David Orton, Assistant City Attorney
8 WSB # 27123
9
VERIFICATION OF CARY BOZEMAN
10
CARY BOZEMAN, on oath, says on behalf of the above -named plaintiff
11
1 I am the Mayor of the City of Bremerton
12
13 2 I have read this ANSWER, know its contents and believe the same to be true
14
15
DATED this X day of 2004
'
16
17
18 GARY BOZEMAN
19 Signed and sworn to before me on the day of o 2004 b
20 Cary Bozeman
21
22 �P V • S� J
23 �!(�.��SStoN Eka�P •�.� (Printed Name)
Notary Public in and for the State of Washington
24 Residing at ? KD12CnA E r16'. t N k
25 J� o U2�? `o �p� My Appointment Expires a•t_Q�
26
ANSWER AND AFFIRMATIVE ROGER A LUBOVICH
DEFENSES-2 BREMERTON CITY ATTORNEY
239 4th Street, Biemerton, Washington 98337
Phone 160.473_ , )Zda P_ z9n A-,') C111
M
,j
1 RECEIVED FOR FILING
KITSAP COUNTY CLERIC
2
AUG 2 6 2004
3 DAVID W PETERSON
4
5
6
7
8 IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON IN AND FOR
9 KITSAP COUNTY, WASHINGTON
10
11 DELL KNAUSS, Case No. 04 -2- 02001 -0
Petitioner,
12 v CITY OF BREMERTON'S MOTIO
FOR CHANGE OF JUDGES
13 THE CITY OF BREMERTON and CITY
14
COUNCIL OF BREMERTON, (Clerk's Action Required)
Respondents
15
16 The City of Bremerton moves the Court for an order granting a change ofjudge
17 because the judge before whom the Petition for Writ of Mandate is set for hearing is
18 prejudiced against the City of Bremerton This motion is made pursuant to RCW 4 12 040
19 and 4 12 050 and is supported by the attached affidavit
2 0 Dated this `�5X day of August, 2004
21 ROGER A LUBOVICH
22 Bremerton City Attorney
24 Roger Lubovich
WSBA # 8942
25 David P Horton, Assistant City Attorney
26 WSBA # 27123
CITY OF BREMERTON'S MOTION FOR ROGER A LU13OVICH
BREMERTON CITY ATTORNEY
CHANGE OF JUDGES - 1
239 4th Street, Bremerton, Washington 98337
Phone 360473 -2345 Fax 360 -473 -5161
v
s
,
E
1 � , � coU D FAR
NTV n�
3
2 A�6 2 6 LUU4
3 AVID w
4
5
6
7
8 IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON IN AND FOR
9 KITSAP COUNTY, WASHINGTON
10
11 DELL KNAUSS, Case No 04 -2- 02001 -0
Petitioner, 12 v AFFIDAVIT OF PREJUDICE BY
ROGER A LUBOVICH IN '
13 THE CITY OF BREMERTON and CITY SUPPORT OF CITY OF
BREMERTON'S MOTION FOR
COUNCIL OF BREMERTON,
14
Respondents CHANGE OF JUDGE
15
16 STATE OF WASHINGTON)
17 ) ss
COUNTY OF KITSAP )
1s ROGER A LUBOVICH, on oath says
19 1 I am the City Attorney of the City of Bremerton
20 2 Petitioner has filed a Petition for Writ of Mandate
21 3 Judge M Karlynn Haberly, before whom the Petition for Writ of Mandate is set for
22 hearing is prejudiced against the City of Bremerton, its City Attorney or its interests, such
23 that the City of Bremerton believes that it cannot obtain a fair and impartial hearing before
24 Judge Haberly
25
26
RO ERA LUBOVICH
AFFIDAVIT OF PREJUDICE BY ROGER ROGER A LUBOVICH
BREMERTON CITY ATTORNEY
A LUBOVICH - 1 239 4th street, Bremerton, Washington 98337
Phone 360 -473 -2345 Fax 360 -473 -5161
Y
1
.w
t
1 Signed and sworn to before me on the4�da of
Y , 2004 b
2 Roger A Lubovich, City Attorney of the City of Bremerton
3
4 ,
A
5 ���{JV V S (Pnnted Name)
G � o ,tssioN Notary Public in and for the State of Washington
. 0
6 q F
:• Residing at
7 My Appointment Expires
y ' �'27 -p1.•.
8
OF WASHING��
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
AFFIDAVIT OF PREJUDICE BY ROGER ROGER LUBOVICH
A LUBOVICH - 2 BREMERTON CITY ATTORNEY
239 4th Street, Bremerton, Washington 98337
Phone 360 -473 -2345 Fax 360 -473 -5161
I
RECEIVED FOR FILING
1 KITSAP COUNTY CLERK
2 I�UG 2 6 2004
3
DAVID w P ETE RSON
4
5
6
7
8 IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON IN AND FOR
9 KITSAP COUNTY, WASHINGTON
10
11 DELL KNAUSS, Case No 04 -2- 02001 -0
Petitioner,
12 V NOTICE OF APPEARANCE
13 THE CITY OF BREMERTON and CITY
14 COUNCIL OF BREMERTON,
Respondents
15 TO THE CLERK OF THE ABOVE- ENTITLED COURT, and
16 TO WALTER HACKETT, Attorney for Petitioner,
17
YOU AND EACH OF YOU WILL PLEASE TAKE NOTICE that the above -
named Respondents, City of Bremerton and City Council of Bremerton, without waiving
18 objection as to improper service, venue or jurisdiction, appear in the above - entitled
19 matter by their undersigned attorney, and you are further notified that service of all
20 further pleadings, notices, documents or other papers herein, exclusive of process, may
21 be had upon said respondents, by service upon the undersigned at the address below
22 DATED this 25�-- day of August, 2004
23 ROGER A LUBOVIC
Bremerton City Attorn
24
By
25 Dav Orton, ss stant City Attorney
WSBA # 27123
26 239 Fourth Street
Bremerton, WA 98337
NOTICE OF APPEARANCE - 1 ROGER A LUBOVICH
BREMERTON CITY ATTORNEY
239 4th Street, Bremerton, Washington 98337
Phone 360473 -2345 Fax 360 -473 -5161
1 �
IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON
FOR KITSAP COUNTY
1
2 DELL KNAUSS, ) NO I 2 02 0 01 (
3 )
4 Petitioner, ) PETITION FOR WRIT
OF MANDATE
5 v )
6 THE CITY OF BREMERTON and )
RECEIVED PON FILING
CITY COUNCIL OF ) KITSAP COUNTY CLERK
BREMERTON,
) AUG 13 OIIQ
8 ) ')A v'U vv Hr FER
• Respondents ) ON ,
9 )
10
11 NOW COMES the Petitioner herein, and pursuant to RCW
12
35 17 260 and any other pertinent statutes and respectfully show the
13
Court
14
15 I
16 The Petitioner, DELL KNAUSS, is a resident and elector of the
17 City of Bremerton, Washington
18 II
19 That the Defendant City of Bremerton in the County of Kitsap,
20 State of Washington, is a city organized under the laws of the State of
21
Waslungton
22
23
24
25
26
PETITION FOR WRIT OF MANDATE - 1
27
28
L* r
1
III
I That the Bremerton City Council acts as the legislative body for
2 the said city
3 IV
4
5 That the said city has the power to enact ordinances regulating
6 any and all improvements to public streets within its corporate limits
7 and to regulate the flow of traffic
8 V
9 That on July 12, 2004, a proposed initiative for adoption of the
10 following ordinance was filed with the City of Bremerton The said
11 ordinance was as follows,
12
An ordinance of the City of Bremerton prohibiting construction
13
14 of a vehicular traffic tunnel as part of the downtown pedestnan/BTC
15 access improvements The City of Bremerton does ordain Section 1
16 The City of Bremerton shall not construct a vehicular traffic tunnel as
17 part of the downtown pedestnan/BTC access improvements project
18 VI
19 The said initiative designated 101 was certified as being signed
20 by 25% of the votes cast by all candidates for Mayor at the last general
21
election on July 23, 2004.
22
23
24
25
26
PETITION FOR WRIT OF MANDATE - 2
27
28
y
VII
1 That the City Council of Bremerton has refused to adopt the
2 proposed ordinance and in addition adopted a resolution refusing to
3 place the proposed ordinance on the ballot
4
5 WHEREFORE, Petitioner prays that this Court exanme the said
6 initiative and Auditors certificate and enter a Writ of Mandate directing
7 the City of Bremerton and the City Council thereof to place the matter
8 on the ballot for the November 2, 2004, General Election
9 sp��� �' .
�.
10 WALTER M HACKETT, JR
Attorney for Petitioner
11 WSBA #1055
12 VERIFICATION
13
14 DELL KNAUSS, states under the pains and penalties of penury
15 under the laws of the State of Washington, that he has read the Petition
16 herein and believe the contents to be true
17 DATED I //.3 1O1
18
19
20
21
22
23
24 LAW OFFICES OF
WALTER M. HACKETT, JR.
25 423 Pacific Avenue, #202
Bremerton, WA 98337
26 (360) 377 -4481
27 PETITION FOR WRIT OF MANDATE - 3
28
DATE SUBMITTED July 29, 2004 BILL
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
■■ aaarrarrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrarrrrrrrrrrrrrrrrrrrarrsarrrrrrrr
SUBJECT: Public Hearing on Resolution Committee Meeting Date J u l y 28, 2004
No. A 13 .3 regarding the Downtown COUNCIL MEETING Date: August 4, 2004
Pedestnan/BTC Access Improvements Department- City Attorney's Office
Project - Initiative Petition Presenter- Roger A. Lubovich
Phone: 473 -2345
SUMMARY: Citizen's Initiative 101 was certified by the County Auditors office on July 23, 2004
This initiative petition seeks to prohibit the City from constructing a traffic tunnel as a part of the
Downtown Pedestnan/BTC Access Improvements Project in downtown Bremerton The City Council
has three options with regard to the initiative petition.
1) adopt the proposed ordinance as presented in the petition,
2) submit the initiative to a vote of the citizens, or
3) not submit the initiative to a vote of the citizens
It is the City Attorney's recommendation that the initiative petition not be submitted to the voters for
the following reasons -
a The subject matter of the initiative petition is not a valid subject pursuant to Seattle Building
and Construction Trades Council v Seattle, 94 Wn 2d 740 (1980),
b The issue presented in the initiative petition is now moot, and
c Submitting the initiative to a vote of the citizens would be confusing in that the voters may
think they have an impact on the tunnel decision
ATTACHMENTS: Proposed Resolution, Initiative 101 Petition, Letter of Certification
FISCAL IMPACTS (Include Budgeted Amount)
APPROVALS:
DEPARTMENT DIRECTOR -
CITY ATTORNEY 4
FINANCE DIRECTOR: r
MAYOR
FISCAL/BUDGET- Pre-Council 7/28/04
CONSENT AGENDA
OPERATIONS:
Pre-Council 7/28/04 ❑
COUNCIL PRESIDENT-
T__ . _ -
RECOMMENDED MOTION:
I move to pass Resolution No q 3 3 electing not to submit the initiative to a vote of the
citizens.
COUNCIL ACTION: ❑ Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
R \LEGAMcpartmenu- CmemWity Councd\Tunnei ab doc 44
RESOLUTION NO. %133
A RESOLUTION of the City Council of the City of
Bremerton, Washington, taking action not to submit to the
quahfied electors of the City of Bremerton at the November 2,
2004 General Election, Initiative Petition 101 relating to
construction of a vehicular traffic tunnel as part of the Downtown
PedestnanBTC Access Improvements Project.
WHEREAS, an Initiative Petition signed by registered voters, equal in number to
at least twenty -five percent of the total votes cast for all candidates for Mayor at the last
preceding City of Bremerton election, has been filed with the City Clerk as provided for in RCW
35.17.260, and
WHEREAS, the Petition seeks to prohibit the City from constructing a traffic
tunnel as part of the Downtown PedestnanBTC Access Improvements Project ( "Project ")
WHEREAS, the City Clerk, through the Kitsap County Auditor, on July 23, 2004,
verified the sufficiency of the signatures thereto, and
WHEREAS, RCW 35 17 260 provides for the matter to be presented to the City
Council within 20 days of certification of sufficiency of signatures for either adoption of the
ordinance as proposed or to forward the initiative to election on November 2, 2004; and
WHEREAS, the County Auditor requires a Resolution approved by the City
Council authorizing the placement of the proposition on the November General Election, and
WHEREAS, the State of Washington, in a letter from the Secretary of
Transportation received by the City on July 13, 2004, notified the City that the State is assuming
the Project; and
WHEREAS, because the State has assumed jurisdiction of the Project, the City
Council finds that the subject matter of the initiative petition is not a valid subject pursuant to
Seattle Building and Construction Trades Council v Seattle, 94 Wn 2d 740 (1980), the issue
presented in the initiative petition is now moot, and submitting the initiative to a vote of the
citizens would be confusing in that the voters may think may think they have an impact on the
tunnel decision, and
WHEREAS, the City Council has three options when reviewing the initiative
petition. 1) adopt the proposed ordinance, 2) submit the initiative to a vote of the citizens, or 3)
decide not to submit the initiative to a vote of the citizens, and
WHEREAS, because of the above -noted findings, the City Council finds that it
would be inappropriate to submit the Initiative Petition to the voters; NOW THEREFORE
1
Initiative Petition 101
45
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS.
SECTION L The recitals set forth above are hereby incorporated as if set forth
herein in full
SECTION 2. Initiative Petition 101 shall not be placed on the November
General Election.
SECTION 3. Severability If any one or more sections, subsections, or
sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this Resolution and the same shall remain in full
force and effect
SECTION 4. Effective Date. This Resolution shall take effect and be in force
immediately upon its passage
PASSED by the City Council of the City of Bremerton, Washington this
day of , 2004.
DAREN NYGREN, Council President
APPROVED AS TO FORM- ATTEST.
ROGER A LUBOVICH, City Attorney PAULA JOHNSTON, City Clerk
R %EGAL\R=1uhons\City CounciA[mhative Penhon doc
2
Initiative Petition 101
46
INITIATIVE 101
"Citizens Against The Tunnel (CATT)" Wants to Give you the
RIGHT TO VOTE ON A TUNNEL
INITIATIVE PETITION FOR SUBMISSION TO THE CITY COUNCIL OF BREMERTON, WASHINGTON
To the City Clerk of the City of Bremerton Washington We, the undersigned registered voters of the City of Bremerton, Washington, respectfully direct that this petition and the proposed ordinance contained herein enuded 'An ordumoo prohibiting construction
of a downtown —( be enacted into law and furthermore of the City Council farts to enact this ordinance ice that at be submitted to a vote of the people at a regular or special election to be held on a dare and in the manner required by the Revised Code of
Washington and each of us for lumself or herself says I have personally signed this petition, T am a Legal voter of the City of Bremerton Washington my residence address is correctly stated and 1 have knowingly signed this petition only once_
Statement of Action Sought
The purpose of this initiative is to prohibit the City of Bremerton from constructing a vehicular traffic tunnel as part of the Downtown Pedestrian/BTC Access Improvements project Such an initiative is authonzed by the Bremerton City Charter Section 5 and
Section 36, adopting RCW 35 17 240 through RCW 35 17360
Text of Ordinance. The proposed ordinance reads as follows Ordooance _ (Inmative NI01) An ordinance of the City of Bremerton prohibiting construction of a vehicular traffic tunnel as part of the Downtown PedestnanBTC Access Improvements
The City of Bremenon Does Ordain Section t The City of Bretnertom shall not construct a vehicular traffic tunnel as part of its Downtown Pedestnan/BTC Access Improvements project
Warning Every person who signs this petition with any other than his or her rue name or who knowingly signs more than one of these petitions or signs a petition seeking an election when he or she is not a legal voter or signs a petition when he or she is
othcrwtsc not qualified to sign or who makes herein any false statement, shall be guilty of a nusderneanor
CITY OF BREMERTON INITL4TIVE TO THE PEOPLE CITY OF BREMERTON VOTERS SIGN BELOW
Petitioner is Residence Address
Petitioner s St tune Date Petitioner's Pnnted Name Must reside within City limits of Bremerton Cit or Town 2i Coun
to I
3 -- —
2
3
4
5
6
8
9
10 _
MAIL COMPLETED PETITIONS TO
CITIZENS AGAINST THE TUNNEL (CATT)
PO Box 502, Bremerton, WA 98337
(360) 377 -1594
07/25/2004 15 58 PAZ 360 557 5769 BITSAP COUNTY ELECTIONS 0 002
Is Karen Flynn
Kitsap County Auditor - Elections & v ote r Registration
1026 Sidney Avenue, Suite 175 • Port Ombard, Wsshm&n 98366.4678
Telephone (360) 337 -7128 • Faesunlle (360) 337 -5769
Add Ariwoola
Ftancbt S*n*Rs Manages
WIMk Mores-Logan
Chet DepufyAuwW
CERTIFICATE OF S1U'FFICIENCY
I hereby certify, in accordance with RCW 35.17.260, that the Pctitlon
Initiative 101 from the City of Bremerton, Washington (Citizens Against The
Tunnel), was signed by at least twenty -five percent (2,060 of 8,238) of the votes
cast for all candidates for mayor at the last general election at the last preceding
general election.
WITNESS my hand and official seal of office affixed
this 23"' day of July 2004.
mob,? ,a.♦• ;��
r
KAREN FL =
Kitsap County Auditor -
Admutistrabun Accounts p
360)337 -7128 dyable Payroll Vehicle t.lesnaing Public Raeobs
(
360 337 -8645 (300( 337.7122 (360) 337 -7123 (360) 3374140 (360) 3374935
Fax. 337 -7016 4 F$ 337.7016 Fax 337464S Fax 337.1645
Poll Free From- 01811a 851.4147 • 6alnbrldue Island 842 -2081
.( Office of the City Attomey FILE
Roger A Lubovich, Cfty Attomey
Memorandum
TU. City Council
F0'Qm; Roger A Lubovic
Re; Downtown Pedestri TC Access provements Project — Initiative Petition
D8t8: August 2, 2004
Facts. On July 12, 2004, the City Clerk received a copy of a citizen's initiative which provides-
"The City of Bremerton shall not construct a vehicular traffic tunnel as part of its Downtown
Pedestnan/BTC Access Improvements protect" (emphasis added) This initiative petition in
essence seeks to stop construction of a traffic tunnel as a part of the street improvements
proposed for State Route 304 in downtown Bremerton The initiative was certified by the County
Auditors office on July 23, 2004 as having enough signatures to submit to the voters for an
election On July 13, 2004, the City received a letter from Douglas B. MacDonald, Secretary of
Transportation, Washington State Department of Transportation informing the City that the State
was assuming jurisdiction over the project
City Council options. The City Council has three options with regard to the presented initiative
petition The City Council may take action to.
1) adopt the proposed ordinance as presented in the petition,
2) submit the initiative to a vote of the citizens, or
3) not submit the initiative to a vote of the citizens.
Recommendation. I recommend that the City Council vote not to submit the initiative to a vote
of the citizens for the following reasons
a The subject matter of the imtiative petition is not a valid subject pursuant to
Seattle Building and Construction Trades Council v Seattle, 94 Wn.2d 740
(1980),
b The issue presented in the initiative petition is now moot, and
c Submitting the initiative to a vote of the citizens would be confusing in that the
voters may think they have an impact on the tunnel decision
Analysis. The primary question raised concerns the fundamental issue of whether this type of
decision, which basically is whether to construct a vehicular traffic tunnel as part of its
downtown street improvement to State Highway 304, is a proper subject for an initiative by the
citizens of Bremerton
Downtown Pedestnan/BTC Access Improvements Project
August 2, 2004
Page 2
My conclusion, after reviewing the relevant cases in this state, is that the decision whether to
construct a tunnel as part of the improvement project is not subject to an initiative by the citizens
of Bremerton since the primary decision - making authority resides with the State Department of
Transportation and not the City Council of the City of Bremerton
The Bremerton City Charter provides for the process of initiative and referendum by the citizens
of the City, which is to be exercised in the manner set forth in RCW 35 17 240 — 35.17 360
Certain procedural requirements must be met, such as obtaining the required number of
signatures on the petition, before an initiative is valid. However, in addition to the procedural
requirements for an initiative petition to be valid, there are two tests that have been created by
the courts in this state and consistently applied to initiative measures to determine if they concern
valid subjects for the exercise of the power of initiative. Not all types of city council actions are
subject to the initiative and referendum process I will briefly outline these tests and how they
apply to the facts in this situation
The first test applied by the courts in Washington is whether the underlying council action is
legislative or administrative in nature The power of the people to adopt legislation directly
through the initiative process is limited to actions that are legislative in nature. See Ruano v
Spellman, 81 Wn 2d 820 (1973) If an action is deemed to be administrative in nature, then the
decision in not subject to initiative or referendum�powers
In this context, an act is characterized as legislative or administrative according to the following
two tests
Actions relating to subjects of a permanent and general character are usually regarded as
legislative, and those providing for subjects of a temporary and special character are
regarded as administrative.
In addition, the power to be exercised is legislative in nature if it prescribes a new policy
or plan, whereas it is administrative in nature if it merely pursues a plan already adopted
by the legislative body itself or some power superior to it Citizens for Financially
Responsible Government v Spokane, 99 Wn 2d 339 (1983)
Applying these tests to the facts in this situation, a decision concerning whether to construct the
street improvement project to SR 304 by means of a tunnel is not a legislative decision of the city
council The street improvement is an action that will be of a permanent and general character,
however, the decision to construct a major street improvement to SR 304 in downtown
Bremerton by means of a vehicular traffic tunnel merely pursues a plan already adopted by some
power superior to it, in this case, the State
The key decisions relating to this project are no longer subject to the control of the City Council
This is true for the underlying decision whether to pursue the project at all and also for the
decision whether the project should be completed by means of a vehicular traffic tunnel or a
surface street These key decisions are not being made by the City but rather by the State
Downtown Pedestnan/BTC Access Improvements Project
August 2, 2004
Page 3
One earlier Washington court case that needs to be considered in this analysis is Seattle Building
and Construction Trades Council v Seattle, 94 Wn 2d 740 (1980) In that case, an initiative was
proposed by citizens in Seattle to withdraw the city's participation in a limited access highway
project (an improvement to a portion of Interstate 90) The initiative was challenged as being
beyond the powers of the initiative process The Waslungton Supreme Court applied the tests
outlined above and concluded that the initiative process did not apply because the actions
remaining to the City of Seattle were administrative in nature and thus not subject to a citizen's
initiative
The conclusion in the Seattle Building Council case is applicable to the situation in Bremerton.
The court emphasized in that case that the highway being constructed was a limited access
facility governed by the procedures in Ch. 47 52 RCW As a limited access facility, the state had
full jurisdiction, responsibility and control over it While Seattle had a voice in determining the
type of facility to be constructed, its participation was limited to the role provided in Ch. 47.52
RCW If the city disapproved of the plan proposed by the state highway department, it could
only file that disapproval in writing with the state Secretary of Transportation and request a
hearing before a board of review. After a hearing before the board, the board makes the final and
binding decision, subject to revision only by stipulation of the parties.
The court concluded the role of Seattle in the Interstate 90 improvement project was merely
administrative in nature The city had no authority to act in a legislative capacity iwregard to the
location and construction of the limited access facility. The city could not ban construction of
the facility nor refuse to cooperate in construction once the plan had been adopted. The key
decisions regarding the project were made by the state.
In Bremerton, although the portion of the street protect under consideration is not a limited
access facility, the result is the same in that the decision whether to proceed with construction of
the project rests with the State, not the City Council The decision whether to construct a traffic
tunnel as the means of accomplishing the project also rests with the State So in my opinion, the
key facts in the Seattle Building Council case are similar to the facts in Bremerton and it seems
likely that the court would reach the same conclusion
The second court- created test that must be applied to determine if an action of a city council is
subject to the initiative process is whether the underlying grant of authority by the state
legislature in regard to the action being taken is to the city as a corporate entity or to its
legislative authority (which is the city council for cities) See Lince v Bremerton, 25 Wn App
309 (1980), and Leornard v Bothell, 87 Wn 2d 847 (1992)
If the grant of authority is to the city as a corporate entity, direct legislation by the people in the
form of initiative or referendum is permissible If the grant of power is to the legislative
authority of the city, then initiative and referendum is prohibited
Downtown Pedestnan/BTC Access Improvements Project
August 2, 2004
Page 4
When applying this test, it is necessary to determine the statutory grant of authority underlying
the action involved. The primary statute applicable to this situation appears to be RCW
35.22 280, which contains a list of powers granted to first class cities such as Bremerton The
statute provides;
Any city of the first class shall have power .
(7) To lay out, establish, open, alter, widen, extend, grade, pave, plank, establish
grades, or otherwise improve streets, alleys, avenues, sidewalks, wharves, parks,
and other public grounds .
(12) To construct and keep in repair bridges, viaducts, and tunnels, and the
regulate the use thereof,
Because this statute does not reference the city council, the primary grant of authority by the
state legislature to construct and improve streets and construct tunnels is to the city as a corporate
entity. This leads to the conclusion that this action under tins test is subject to the citizen
initiative process
After reviewing the two tests applied by courts in this state to determine if an action by the City
Council is subject to the initiative process, it appears that the proposed subject of the initiative,'
which prolubits the City from constructing a vehicular traffic tunnel as a part of the
improvements to SR 304, is not valid for the initiative process in Bremerton because the decision
of the City Council is administrative in nature pursuant to Seattle Building Council
City Council Action. A decision must be made by the City Council when an initiative measure
is successfully submitted by the citizens. As noted above, the City Council has three options
when reviewing the initiative petition- 1) adapt the proposed ordinance, 2) submit the initiative
to a vote of the citizens, or 3) decide not to submit the initiative to a vote of the citizens The City
Council is directed by RCW 35.17 260, after receiving a valid initiative, to either pass the
proposed ordinance within twenty days or cause an election to be held on the next appropriate
election date and submit the initiative to a vote of the citizens of the City.
However, in view of the tests outlined above, the initiative proposed is not a proper subject for
an initiative. As noted above, tlus is because the subject of the initiative relates to an
administrative action Some city councils have refused to submit an initiative measure to the
voters because they have deemed it to involve an issue that is not properly subject to the
initiative process.
The courts in this state have reviewed initiative measures before they are submitted to the
electorate for a vote in order to make the determination of whether the proposed law is beyond
the scope of the initiative process Seattle Building Trades Council v Seattle, 94 Wn 2d 740
(1980) The courts will apply the tests outlined above and make this determination
Downtown Pedestnan/BTC Access Improvements Project
August 2, 2004
Page 5
The state statutes that govern the initiative process for the City of Bremerton also provide a
reference to subnuttmg a proposed initiative to the courts It provides in RCW 35.17 290 that if
the clerk finds the petition msufficient, or if the city council refuses either to pass the initiative or
order an election, then any taxpayer may commence an action in superior court in order to obtain
a decree ordering an election to be held
Additionally, because of the action by the State to take over the project, the subject matter to be
voted on by the citizens is moot Any vote against the tunnel project will have no impact on the
State's action relating to the same since the State is the decision maker A vote by the citizens on
the initiative may cause confusion in that the voters may believe their vote will have an impact
on the project when in fact it will not
Conclusion. Because the proposed subject of the initiative, which prolubits the City from
constructing a vehicular traffic tunnel as a part of the improvements to SR 304, is not valid for
the initiative process because the decision of the City Council is administrative in nature
pursuant to Seattle Building Council, it is my recommendation that the City Council vote to not
submit the initiative to a vote of the citizens.
Adak
Washington State Transportation Building
CAW Department of Transportation 310 Maple Park Avenue S E
Douglas B. MacDonald P O Box 47300
Secretary of Transportation Olympia WA 98504 -7300
360 - 705 -7000
TTY 1 -800 -833 -6388
www wsdot wa gov
July 13, 2004
The Honorable Cary Bozeman
Mayor, City of Bremerton
Councilman Daren Nygren,
Council President, City of Bremerton
239 Fourth Street
Bremerton WA 98337
Re Downtown Bremerton Pedestnan/BTC Access
Improvement Project
Dear Mayor Bozeman and Councilman Nygren
I write today regarding the Downtown Bremerton Pedestnan/BTC Access Improvement Project
on State Route 304 I understand that the draft Environmental Assessment stage of tlus project
should be completed shortly.
As we move from the draft Environmental Assessment to the final Environmental Assessment,
WSDOT must step forward to fulfill its statutory responsibilities for management of this state
highway project -
State law requires WSDOT to "exercise all the powers and perform all the duties necessary,
convenient, or incidental to the planning, locating, designing, constructing, improving,
repairing, operating, and maintaining (of) state highways" (See RCW 47 01 260 )
We are prepared to handle the complex scope issues and public involvement question required
of such a project The Environmental Assessment may raise many issues that will have to be
addressed with the community before the project could proceed
WSDOT looks forward to continuing to work with the City of Bremerton Randy Hain,
WSDOT"s Olympic Region Administrator, can be reached via telephone at (360) 357 -2605 with
any questions
Sincerely,
Douglas B acDonald
Secretary of Transportation
DBM jaa
cc Randy Hain, WSDOT, 47440
Larry Ehl, WSDOT, 47322
City Council - FW Proposal for Bremerton Tunnel Page 1
From "Elizabeth & Don Drury" <dedrury@wavecable.com>
To <atycouncII@ci bremerton wa us>
Date Tue, Aug 3, 2004 1 15 PM
Subject- FW Proposal for Bremerton Tunnel
- - -- Original Message-- -
From. Elizabeth & Don Drury [madto dedrury@wavecable com]
Sent Tuesday, August 03, 2004 11 12 AM
To. Bremerton City Council
Cc Bozeman, Cary
Subject Proposal for Bremerton Tunnel
Dear Mayor Bozeman and Members of the Bremerton City Council,
I have followed the saga of the proposed tunnel by the Bremerton ferry
landing for many months I considered writing a letter earlier, but thought
it would be unnecessary I am not one to write letters to have them printed
in the newspaper However, I continue to read letters from people in the
paper who seem to be thinking that you are not listening to the people
While I do not live in Bremerton, I have a definite interest in this matter
My husband and I live, in Seabeck, not very far away We have lived in Kitsap
County for over thirty years and before that in King County I often use
the Bremerton ferry (depending on how convenient the schedule is to where I
am headed in Seattle) Returning home from Seattle, I am not preparing to
shop in downtown Bremerton I am usually tired and my one stop might be at a
grocery to buy bread or milk
In my opinion, the majority of cars coming off the ferry are trying to get
to areas unrelated to downtown Bremerton
I have been excited to learn of plans to tunnel under the streets near the
ferry terminal It would be wonderful to have more pedestrian friendly
streets and parks in the downtown area near the waterfront This will draw
me to Bremerton
It would be helpful, I would think, to point out that there will be an exit
for the City of Bremerton from the tunnel I truly believe, when there is a
working tunnel to channel ferry traffic away from the business district,
Bremerton will have the opportunity to become a rather nice city I believe
shop owners will like the ambiance and so will all of us who live nearby.
I believe I have been reading the letters (in The Sun) of many disgruntled
property owners of stagnant, depressed, old buildings in downtown Bremerton
i have often wished that the owners would tear down those buildings and
create parks until the interest is evident in constructing new buildings in
a more interesting commercial pattern that would allow views of the water
and mountain and would draw shoppers to new businesses To think that our
present setup will bring people back to Bremerton is not visionary
I truly believe that this matter is to be handled by the Highway Department
of the State of Washington With input from the community, I am confident
that the design will be pleasing to all concerned
City Council - FW pr000sal for Bremerton Tunnel
Sincerely,
(Gretchen) Elizabeth Drury
11525 Seabeck Hwy N W
Seabeck, Washington 98380
(360)830 -3024
City Council - SR 304 Roufe Downtown Bremerton Page 1
From Phil Williams
To Council, City
Date: Tue, Aug 3, 2004 2 26 PM
Subject: SR 304 Route in Downtown Bremerton
A question was raised at the Council study session on 7/28 regarding the specific route of SR 304 in
downtown Bremerton The State's Project Manager from the WSDOT Local Programs Office, Neal
Campbell, provided the following answer via e-mail on 7/29
"We checked that out Our state highway log lists the whole loop Burwell
down Pacific onto 1 st and into the ferry terminal, out of the ferry terminal
onto 1st, Washington and back on Burwell The Washington side of the loop
is listed as the 304 couplet Some commercial maps do not show both sides
of the loop "
If you have any further questions please contact either Mike Mechem or myself If you wish to contact the
State directly you can e-mail Neal at camoben(cDwsdot we gov
CC: Johnston, Paula, Lubovich, Roger, Mayor, The, Mechem, Mike, Sampley, Gene
Gene David Hart
P.O Box 773
Bremerton, WA 98337
August 4, 2004
Senator Patty Murray
111 Russell Senate Office Bldg
Washington, D C. 20510
Dear Patty,
1 Well, here it is August 2004 And I'm reminded of the book, The Guns of August
That's the book about the failure to communicate -- failure, which began World War I, 90
years ago Fortunately, President Kennedy read that book just before the beginning of the
Cuban Missile Crisis, 42 years ago And he applied to the Cuban Missile Crisis the
book's learned lessons in failure to communicate -- helping America to end the Crisis,
preventing World War III, paying the price of 1 American life, and bearing the burden of
1 American life lost, to get it all done
2 Well, now we have another failure to communicate This time it's here in Washington
State, today. Norm Dicks, Cary Bozeman and even a majority of the Bremerton City
Council insist on spending 28 million dollars to build a tunnel through the heart of
Bremerton, rather than use the money for a sensible surface street alternative, honor
3.000 citizen's unalienable right to a binding vote about it, and address the higher
transportation priorities which exist in Washington State
3 Patty, give this message to Norm
4 If Norm wants millions of dollars to prevent the death of 7 more angels on Highway 3
between Gorst and Belfair, if he wants millions of dollars to prevent the death of 1 more
angel at the Burley - Olalla intersection on Highway 16, and if Norm wants millions of
dollars to build a bridge across Sinclair Inlet to decrease the level of danger for fatal and
mayor -injury transportation collisions in the Gorst corridor, to save travel time, to prevent
that daily air pollution and to improve air quality over Sinclair Inlet, then tell him you
pledge to work hard to get that money for him
5 But without a binding vote by the people, respective to the tunnel, you pledge he will
get -- not I penny for a tunnel through the heart of Bremerton
Sincerely,
/ 1!5; / -
GENE DAVID HART
P.S Sorry I missed you at Kitsap's last Jefferson - Jackson supper I was simply too sick
and tired to attend and suffer the political tom foolery that goes on, while our children
remain uneducated, our fellow citizens are being killed on Washington State streets,
roads and highways, and our people are without jobs
PUBLIC COMMENT BEFORE THE CITY COUNCIL on 4 August, 2004 by Helen Miller
Council President and Council Members: c(opy
I offer comment concerning Council Resolution 2933, regarding the "Downtown
Bremerton Pedestrian BTC Access Improvement Project" (Initiative #AB04 -151)
I question the propriety and the legality of the Resolution being considered this
evening -
At this point in time - there is a City Study - but NO PROJECT.
Where is the precedent for asking people to vote on a matter that is as yet
undetermined ?
Can a relatively small City group legally qualify to place a measure like this on a State
ballot ?
I also understand that the State Transportation Department has, or will be assuming
control of the Pedestrian Friendly Project ... Which further makes the assumptions upon
which the Initiative is predicated - moot.
I am also concerned about the cost the taxpayers of our community would have to
bear for putting the Initiative on the November Ballot, if that is indeed possible. Especially
when no one in the city has identified the source of the $8,000 to $20,000 cost to put the
measure on the ballot. This concern is based on what was being said by the Administration
during the Budget Negotiations last year - that "there was not a nickel to spare in the
approved budget."
In light of the questionable legality and costs - it would be inappropriate for the
Council to approve putting this measure on the Ballot.
- - Re -�, P� J V v
EsaP
r: Karen Flynn
Kitsap County Auditor - Elections & Voter Registration
MQ
1026 Sidney Avenue, Suite 175 • Port Orchard, Washington 98366 -4678
Telephone (360) 337 -7128 • Facsimile (360) 337 -5769
Adi Ariwoola
Financial Services Manager
Winnie Flores -Logan
Chi
ef Deputy Auditor
August 5, 2004 C E D AUG 0 9 2004
TAX & LICEIy
sE
City of Bremerton
Attn: Paula Johnston
239 Fourth Street
Bremerton WA 98337
Dear Paula Johnston:
Petition Initiative 101 (Citizens Against The Tunnel) will be retained in the
Auditor's Office for a period of at least six years Upon request, a certified copy or
the original can be provided to the City of Bremerton at any time during the six -
year retention period.
Please contact the Elections Division at 360 337 -7128 with any questions you may
have
Sincerely,
KAREN FLYNN
Kitsap County Auditor
B
Dolores Gilmore, Elections Manager
Administration Accounts Payable Payroll Vehicle Licensing Public Records
(360) 337 -7129 (360) 337 -7122 (360) 337 -7123 (360) 337.4440 (360) 337 -4935
Fax 337 -4645 Fax 337 -7016 Fax 337 -7016 Fax 337 -4645 Fax 337 -4645
Toll Free from Olalla 851 -4147 • Bainbridge Island 842 -2061
Law
FINANCIAL SERVICES
City Clerk i Paula Johnston
pjohnston@cl brenterton wa us Tel 36073-53i3
Fiw 360473-5200 = z
239 4th S#6`6
Bremerton, WA 98337'
August 5, 2004
Karen Flynn
Kitsap County Auditor
614 Division Street, MS-31
Port Orchard, Washington 98366
Dear Ms. Flynn-
Enclosed for your records is a fully executed copy of Resolution No. 2933 approved by the City
Council on August 4, 2004. This Resolution takes action not to submit Initiative Petition 101
relating to construction of a vehicular traffic tunnel as part of the Downtown Pedestrian/BTC
Access Improvements Project to the voters at the November 2, 2004 General Election
W Sincerel ,
cere,
City C
ul
aa Johns n
C
PJ:ch
enclosure
RESOLUTION NO. q 33
A RESOLUTION of the City Council of the City of
Bremerton, Washington, taking action not to submit to the
qualified electors of the City of Bremerton at the November 2,
2004 General Election, Initiative Petition 101 relating to
construction of a vehicular traffic tunnel as part of the Downtown
Pedestnan/BTC Access Improvements Project
WHEREAS, an Initiative Petition signed by registered voters, equal in number to
at least twenty -five percent of the total votes cast for all candidates for Mayor at the last
preceding City of Bremerton election, has been filed with the City Clerk as provided for in RCW
35 17 260, and
WHEREAS, the Petition seeks to prohibit the City from constructing a traffic
tunnel as part of the Downtown Pedestnan/BTC Access Improvements Project ( "Project ")
WHEREAS, the City Clerk, through the Kitsap County Auditor, on July 23, 2004,
verified the sufficiency of the signatures thereto, and
WHEREAS, RCW 35 17 260 provides for the matter to be presented to the City
Council within 20 days of certification of sufficiency of signatures for either adoption of the
ordinance as proposed or to forward the initiative to election on November 2, 2004, and
WHEREAS, the County Auditor requires a Resolution approved by the City
Council authorizing the placement of the proposition on the November General Election, and
WHEREAS, the State of Washington, in a letter from the Secretary of
Transportation received by the City on July 13, 2004, notified the City that the State is assuming
the Project, and
WHEREAS, because the State has assumed jurisdiction of the Project, the City
Council finds that the subject matter of the initiative petition is not a valid subject pursuant to
Seattle Building and Construction Trades Council v Seattle, 94 Wn 2d 740 (1980), the issue
presented in the initiative petition is now moot, and submitting the initiative to a vote of the
citizens would be confusing in that the voters may think may think they have an impact on the
tunnel decision, and
WHEREAS, the City Council has three options when reviewing the initiative
petition 1) adopt the proposed ordinance, 2) submit the initiative to a vote of the citizens, or 3)
decide not to submit the initiative to a vote of the citizens, and
WHEREAS, because of the above -noted findings, the City Council finds that it
would be inappropriate to submit the Initiative Petition to the voters, NOW THEREFORE
1
Initiative Petition 101
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS
SECTION 1. The recitals set forth above are hereby incorporated as if set forth
herein in full
SECTION 2. Initiative Petition 101 shall not be placed on the November
General Election
SECTION 3. SeverabihV If any one or more sections, subsections, or
sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this Resolution and the same shall remain in full
force and effect
SECTION 4. E fective Date This Resolution shall take effect and be in force
immediately upon its passage
PASSED by the City Council of the City of Bremerton, Washington this j
day of 0 469 , Udt , 2004
DAREN NYGREN, Councl#Pr
APPROVED AS TO FORM ATTEST
ER A L O ICH, City orn A J ON, City Clerk
R \LEGAL\Resoluhons \City CouncilUnitiative Petition doc
2
Initiative Petition 101
07/23/2004 15 58 FAX 360 337 5769 KITSAP COUNTY ELECTIONS 0002
� r
Karen Flynn
MW Kitsa County Auditor - Election
p � s &Voter Registration
1026 Sidney Avenue, Suite 175 4 Port Orchard, Washington 98366 -4678
Telephone (360) 337 -7128 • Facsimile (360) 337 -5769
Add Artwoola
Financial Services Manager
winnie Flores -Logan
Chief Deputy Auditor
CERTIFICATE OF SUFFICIENCY
I hereby certify, In accordance with RCW 35.17 260, that the Petition
Initiative 101 from the City of Bremerton, Washington (Citizens Against The
Tunnel), was signed by at least twenty -five percent (2,060 of 8,238) of the votes
cast for all candidates for mayor at the last general election at the last preceding
general election.
WITNESS my hand and official seal of office affixed
thus 23" day of July 2004.
IV f
v Y
KAREN M&N �, • r --�- '- f i
Kitsap County Auditor ; , f •.' �'
• r
Adm,nistlahon Accounts Payable Payroll Vehicle Llaenaing Public Records
(360) 337 -7129 (380) 337 -7122 (360) 337.7129 (360) 337-0440 (360) 3374935
Fax 337 -4645 Fax 337 -7016 Fax $37.7010 Fax. 337-4645 Fax 337-645
7'011 Free from. 01alla 851 - 4147 • Bainbridge Island 542 -2061
-�45 - --
_. N' e- C61o�� , -.e ms
— -__. _
_ _ __
_ _4L�i/� _. _
O
_ _�itl� 00 ) �i- _a -PPaY'
Karen Flynn
Kitsa P County Auditor - Elections & Voter Registration
!MHINGro" 1026 Sidney Avenue, Suite 175 • Port Orchard, Washington 98366 -4678
Telephone (360) 337 -7128 • Facsimile (360) 337 -5769
Adk Ariwoola
Financial Services Manager
Winne Flores -Logan
Chief Deputy Auditor
CERTIFICATE OF SUFFICIENCY
I hereby certify, in accordance with RCW 35 17.260, that the Petition
Initiative 101 from the City of Bremerton, Washington (Citizens Against The
Tunnel), was signed by at least twenty -five percent (2,060 of 8,238) of the votes
cast for all candidates for mayor at the last general clection at the last preceding
general election.
WITNESS my hand and official seal of office affixed
this 23 day of July 2004.
ry
` " c
KAREN FL
Kitsap County Auditor '
t
Administration Accounts Payable Payroll Vehicle Licensing Public Records
(360) 337 -7129 (360) 337 -7122 (360) 337 -7123 (360) 3374440 (360) 337 -4935
Fax 337 -4645 Fax 337 -7016 Fax 337 -7016 Fax 337 -4645 Fax 337.4645
Toll Free from Olalla 851 -4147 • Bainbridge Island 842 -2061
TRANSMISSION VERIFICATION REPORT
TIME 05/26/2004 15 15
DATE DIME 05/26 15 14
FAX NO /NAME 94782065
DURATION 00 01 17
PAGE(S) 02
RESULT OK
MODE STANDARD
373-����
INITIATIVE 101
"Citizens Against The Tunnel (CATT)" Wants to Give you the
RIGHT TO VOTE ON A TUNNEL
INITIATIVE PETITION FOR SUBMISSION TO THE CITY COUNCIL OF BREMERTON, WASHINGTON
To the City Clerk of the City of Bremerton Washington We, the undersigned registered voters of the City of Bremerton Washington respectfully direct that this petition and the proposed ordinance contained herein entitled "An ordinance prohibiting construction
of a downtown tunnel be enacted into law and furthermore if the City Council fails to enact this ordinance that it be submitted to a vote of the people at a regular or special election to be held on a date and in the manner required by the Revised Code of
Washington and each of us for himself or herself says I have personally signed this petition, I am a legal voter of the City of Bremerton Washington my residence address is correctly stated and I have knowingly signed this petition only once
Statement of Action Sought
The purpose of this initiative is to prohibit the City of Bremerton from constructing a vehicular traffic tunnel as part of the Downtown Pedestnan/BTC Access Improvements project Such an initiative is authonzed by the Bremerton City Charter Section 5 and
Section 36 adopting RCW 35 17 240 through RCW 35 17 360
Test of Ordmance The proposed ordinance reads as follows Ordinance_ (Initiative #101) An ordinance of the City of Bremerton prohibiting construction of a vehicular traffic tunnel as part of the Downtown Pedestrian/BTC Access Improvements
The City of Bremerton Does Ordain Section 1 The City of Bremerton shalt not construct a vehicular traffic tunnel as part of its Downtown Pedestran/BTC Access Improvements project
Warning Every person who signs this petition with any other than his or her true name or who knowingly signs more than one of these petitions, or signs a petition seeking an election when he or she is not a legal voter or signs a petition when he or she is
otherwise not qualified to sign or who makes herein any false statement, shall be guilty of a misdemeanor
CITY OF BREMERTON INITIATIVE TO THE PEOPLE CITY OF BREMERTON VOTERS SIGN BELOW
Petitioner s Residence Address
Petitioner s Signature Date Petitioner s Printed Name Must reside within City limits of Bremerton City or Town Zip Coun
2
3
4
5
6
7
8
9
10
MAIL COMPLETED PETITIONS TO
CITIZENS AGAINST THE TUNNEL (CATT)
PO Box 502, Bremerton, WA 98337
(360) 373 -1594
}: RECEIPT FOR PETITION
We, the undersigned, do hereby certify that we received on
__._ 0
(J� �� 3 1 9 G , at 1 ' 7 1
from C) CY
petition(s) numbered l ,
with an estimated 3 , signatures.
(Sig
ned) !_
\� Election Official
(signed)
,Ele tion Official l
I
ACKNOWLEDGED BY : . % ' e , 117
`'Petitionbkr � '
FINANCIAL SERVICES
Cft Clerk / Paula Johnston
7
pjohnston@cl bremerton wa us
0 0 ',Ftix360'473 - 5200 ,a
.2 39 4th t' -
Bre" h6nj
July 13, 2004 ������ ��,�3
' po
W � I
Karen Flynn
Kitsap County Auditor
1026 Sidney Avenue, Suite 175
Port Orchard, Washington 98366-4678
RE- Initiative #101 Petition
Dear Ms. Flynn
Pursuant to RCW 35 21 005, 1 am transmitting the petition for Initiative #101 that contains
approximately 3,125 signatures for your office to certify
We look forward to receiving your certification as soon as possible
Sincerely,
If Al
Paula John ton
City Clerk
PJ.ch
RECEIVED
Office of the City Clerk INI'T'IA'T'IVE 101
Date 7 -12-0 Ti 2:35 p.m.
SIG T "Citizens Against The Funnel (CATT)" Wants to Give you the
RIGHT TO VOTE ON A TUNNEL
INITIATIVE PETITION FOR SUBMISSION TO THE CITY COUNCIL OF BREMERTON, WASHINGTON.
To the City Clerk of the City of Bremerton, Washington We, the undersigned registered voters of the City of Bremerton, Washington, respectfully direct that this petition and the proposed ordinance contained herein, entitled "An ordinance prohibiting construction
of a downtown tunnel' be enacted into law, and furthermore, if the City Council fails to enact this ordinance, that it be submitted to a vote of the people at a regular or special election to be held on a date and in the manner required by the Revised Code of
Washington, and each of us for himself or herself says I have personally signed this petition, I am a legal voter of the City of Bremerton, Washington, my residence address is correctly stated, and I have knowingly signed this petition only once
Statement of Action Sought:
The purpose of this initiative is to r� ohibit the City of Bremerton from constructing a vehicular traffic tunnel as part of the Downtown Pedestnan/BTC Access Improvements project Such an initiative is authonzed by the Bremerton City Charter Section 5 and
Section 36, adopting RCW 35 17 240 through RCW 35 17 360
Text of Ordinance The proposed ordinance reads as follows Ordinance (Initiative #101) An ordinance of the City of Bremerton prohibiting construction of a vehicular traffic tunnel as part of the Downtown Pedestnan/BTC Access Improvements
The City of Bremerton Does Ordain Section 1 The City of Bremerton shall not construct a vehicular traffic tunnel as part of its Downtown Pedestnan/BTC Access Improvements project
Warning Every person who signs this petition with any other than his or her true name, or who knowingly signs more than one of these petitions, or signs a petition seeking an election when he or she is not a legal voter, or signs a petition when he or she is
otherwise not qualified to sign, or who makes herein any false statement, shall be guilty of a misdemeanor
CITY OF BREMERTON INITIATIVE TO THE PEOPLE CITY OF BREMERTON VOTERS SIGN BELOW:
Petitioner's Residence Address
Petitioner's Signature Date Petitioner's Printed Name Must reside within City limits of Bremerton City or Town Zip
� j Coun ty
V /
3
4
5
6
7
8
9
10
MAIL COMPLETED PETITIONS TO:
CITIZENS AGAINST THE TUNNEL (GATT)
PO Box 502, Bremerton, WA 98337
(360) 373 -1594
07/23/2004 15 58 FAX 360 337 5769 KITSAP COUNTY ELECTIONS 1ij001
Karen Flynn
Kitsap County Auditor ° Elections & Voter Registration
1026 Sidney Avenue, Suite 175 • Port Orchard, Washington 98366 -4678
Telephone (360) 337 -7128 • Facsimile (360) 337 -5769
FAX
To u From. D D 1 1 , 4tp ay�
Fax: _ �0 , �j7 3, 52 Oa Date
Phone: 4- 17 3, 6 g!j Phone:
RE: 1Y.-Z r D Pages:
(Includes cover sheet count)
❑ Urgent XFor Review O Please Comment ❑ Please Reply
Comments:
r
07/23/2004 15 58 FAX 360 337 5769 KITSAP COUNTY ELECTIONS Z 002
r
,P Karen Flynn
Kitsap County Auditor - Elections & Voter Registration
x, 1026 Sidney Avenue, Suite 175 + Port Orchard, Washington 983664678
Telephone (360) 337 -7128 • Facsunlle (360) 337 -5769
AM Ariwoola
Financial S&wces Manager
Winnte Flores - Logan
Chief Deputy Auditor
CERTIFICATE OF SUFFICIENCY
I hereby certify, in accordance with RCW 35.17.260, that the Petition
Initiative 101 from the City of Bremerton, Washington (Citizens Against The
Tunnel), was signed by at least twenty -five percent (2,060 of 8,23$) of the votes
cast for all candidates for mayor at the last general election at the last preceding
general election.
WITNESS my hand and official seal of office affixed
this 23r day of July 2004. , ,
4
KAREN F • ,f f ,�` ` f
Kitsap County Auditor '
Adinin,strahon Accounts Payable Payroll VeMcla Llceneing Public Records
(360) 337 -7129 (350) 337 -7122 (360)33 (360) 337-4440 (360) 337-4935
Fax 3374645 Fax 337 -7016 Fax 337.7010 Fax 337-4645 Fax 337.4645
'roll Free from Malta 8514147 • Bainbridge Island 842 -2061
= = CITY OF BREMERTON
239 4 STREET
BREMERTON WA 99337
R Y �
FAX NUMBER (360) 473 -5200
FAX COVER SHEET
DATE SENT - D TIME
TO
FAX NUMBER
SENDER
SUBJECT
NUMBER OF PAGES INCLUDING COVER SHEET
COMMENTS-
TRANSMISSION VERIFICATION REPORT
TIME 07/23/2004 15:43
DATE DIME 07123 15 41
FAX NO INAME 94782065
DURATION 00.01 08
PAGE(S) 02
RESULT OK
MODE STANDARD
L �
RESOLUTION NO.
A RESOLUTION of the City of Bremerton, Washington
providing for the submission to the qualified electors of the
City at the February 2, 1999 Special Election, a Proposition
to "Stop Fluoridation of the Water Supply of Bremerton,
Washington'
WHEREAS, an Initiative Petition signed by registered voters, equal in number to at least
twenty -five percent of the total votes cast for all candidates for Mayor at the last preceding City
of Bremerton election, has been filed with the City Clerk as provided for in RCW 35 17 260
WHEREAS, the City Clerk, through the Kitsap County Auditor, on September 25, 1998,
verified the sufficiency of the signatures thereto
WHEREAS, RCW 35 17 260 provides for the matter to be presented to the City Council
within 20 days of certification of sufficiency of signatures for either adoption of ordinance as
proposed or to forward the initiative to election on February 2, 1999
WHEREAS, the County Auditor requires a Resolution approved by the City Council
authorizing the placement of the proposition on the February Special Election
WHEREAS, the Bremerton City Council by passage of this Resolution takes no position
on the proposition in forwarding to this item to the County Auditor
NOW, THEREFORE, BE IT RESOLVED by the Bremerton City Council that a
proposition to "Stop Fluoridation of the Water Supply of Bremerton, Washington' be placed on
the February 2, 1999 Special Election
BE IT FURTHER RESOLVED that the City Attorney shall draft and forward the
appropriate ballot title to the County Auditor for the Proposition
PASSED by the City Council of the City of Bremerton this 14th day of October 1998
DAVID FARR, Council President
v �
placable state statutes allow approximately 50 days for an Initiative Petition filing and
view process which includes time for other contingencies such as amendments and
peals Using the Statute, the filing date would be July 28, 1998
The following schedule is made available These dates do not accommodate any
contingencies as provided for in statute or otherwise
8/28/98 (Friday) Petition to be filed with City of Bremerton by close of business,
5 00 p m
9/1/98 (Tuesday) City of Bremerton files petition with county for signature
verification County requires petition by early morning on this
date County requests five full days to verify
9/9/98 (Wednesday) County returns petition to City for placement on Agenda City
policy requires that the council secretary receive all items by 12 00
noon on the Thursday (9/10/98) prior to the council meeting
9/16/98 (Wednesday) Resolution presented to council
9/18/98 (Friday) Resolution filed with County (By state law)
i
3
Z
- Z�
Lew vu
mv C
5x4P5 �A_
ADMINISTRATIVE SERVICES
Interim City Clerk / Paula Johnston F_
pjohnston@cl brernerton wa us i.1360-473-531)
Fax 360-473-5200
239 4th Street'
Date May 26, 2004 Bremerton, WA 98 , 337
To Roger Lubovich, City Attorney
From Paula Johnston, Interim City Clerk
Re Initiative Petition Timeline
Initiative Petition 101 Timeline
Target Date of November 2, 2004 — General Election
July 29, 2004 Petition submitted to City Clerk
August 2, 2004 Petition transmitted to Kitsap County Auditor (within 3 business days)
RCW 35 21 005
August 16, 2004* County issues Certificate of Sufficiency (or Non) RCW 35 21
August 26, 2004** Amended Petition submitted to City Clerk RCW 35 17 280
if Non-Sufficient
September 7, 2004 County issues Certificate of Sufficiency (or Non) RCW 35 17 280
based on amended petition
September 8, 2004 Bremerton City Council Committees discuss Resolution for Initiative Petition
September 15, 2004 Bremerton City Council considers Resolution
September 16, 2004 Resolution filed with Kitsap County Auditor for placement on
November 2, 2004 General Election Ballot
17
September,24, Final day that Resolution can be submitted to the Auditor in order to make
the November 2 ° General Election.
Auditors Office must make determination with reasonable promptness which has in some instances been 30
days Auditor's Office has advised that they can probably verify 3,000 signatures within approx 10
workmg days
In the event of Non-Sufficiency Petitioner has 10 days to amend the petition with additional signatures in
which case more tune for review will be needed
NOTE: The above dates are estimated guidelines to meet the due date of September 24, 2004 for
submitting the approved Resolution to the County Auditor. The time for County review and a
determination of non - sufficiency could affect the date of submittal to the County Auditor for election.
From <Joanbrem @aol com>
To: <pjohnston @ci bremerton wa us>
Date: 7/21/04 7 29AM
Subject: Initiative timeline document dtd 5/26/04
Dear Paula
Please send me another copy of the May 26, 2004 timeline document concerning
the initiative process My copy has been soiled and unreadable
My e-mail address is joanbrem @aol corn
My fax # 478 -2065
Thank You,
Louis Soriano
e
From: Paula Johnston
To: joanbrem @aol com
Date: 7/12/04 4 09PM
Subject: Initiative 101
Lou,
This email is to notify you that there is a correction on the time line I shared with you (via May 26, 2004
memo to Roger Lubovich) regarding pertinent dates for the petition process Please note that the final
day the Kitsap County Auditor will accept a resolution from City Council placing Initiative 101 on the
General Election ballot is Friday, September 17, 2004 NOT September 24th as stated
The Election Office had given me the wrong date when preparing the time line The date of September
15, 2004 for City Council to consider a resolution is still appropriate Please let me know if I can clarify
Thanks
Sincerely,
Paula Johnston, City Clerk
City of Bremerton
239 4th St, Bremerton WA 98337
(360)473 -5323
(360)473 -5200 fax
pjohnston @ci bremerton wa us
CC: Roger Lubovich
CITY OF BREMERTON
,>
2394 TH STREET
BREMERTON WA 98337
FAX NUMBER (360) 473 -5200
FAX COVER SHEET
DATE SENT TIME
TO
FAX NUMBER
SENDER J ��j -S 3a3
SUBJECT
NUMBER OF PAGES INCLUDING COVER SHEET
COMMENTS.
Z 2
or
? - -6
Za
s
FINANCIAL SERVICES
City Clerk / Paula Johnston -
pjohnston&Lbrenwdon waus 73-5311
F& 366"4
2394th Street
July 13, 2004
Karen Flynn
Kitsap County Auditor
1026 Sidney Avenue, Suite 175
Port Orchard, Washington 98366-4678
RE Initiative #101 Petition
Dear Ms. Flynn
Pursuant to RCW 35 21005, 1 am transmitting the petition for Initiative #101 that contains
approximately 3,125 signatures for your office to certify
We look forward to receiving your certification as soon as possible
Sincerely,
Paula John ton
City Clerk
PJ ch
Initiative Petition 101 Timeline
Target Date of November 2, 2004 — General Election
July 29, 2004 Petition submitted to City Clerk
August 2, 2004 Petition transmitted to Kitsap County Auditor (within 3 business days)
RCW 35 21 005
August 16, 2004* County issues Certificate of Sufficiency (or Non) RCW 35 21.005
August 26, 2004 ** Amended Petition submitted to City Clerk RCW 35.17 280
if Non - Sufficient
September 7, 2004 County issues Certificate of Sufficiency (or Non) RCW 35.17.280
based on amended petition
September 8, 2004 Bremerton City Council Committees discuss Resolution for Initiative
Petition
September 15, 2004 Bremerton City Council considers Resolution
September 16, 2004 Resolution filed with Krtsap County Auditor for placement on
November 2, 2004 General Election Ballot
1?
September3 , 2004 Final day that Resolution can be submitted to the Auditor in order to
make the November 2 °d General Election.
*Auditors Office must make determination with reasonable promptness which has in some
instances been 30 days Auditor's Office has advised that they can probably verify 3,000
signatures within approx 10 working days
* *In the event of Non-Sufficiency Petitioner has 10 days to amend the petition with
additional signatures in which case more time for review will be needed.
NOTE: The above dates are estimated guidelines to meet the due date of September 24,
2004 for submitting the approved Resolution to the County Auditor. The time for
County review and a determination of non-sufficiency could effect the date of submittal
to the County Auditor for election.
�( D Page 1 of 1
RCW 35.17.240
Legislative -- Referendum -- Filing suspends ordinance.
Upon the filing of a referendum petition praying therefor, the commission shall reconsider
an ordinance subject to referendum and upon reconsideration shall defeat it in its entirety
or shall submit it to a vote of the people The operation of an ordinance so protested
against shall be suspended until the referendum petition is finally found insufficient or
until the ordinance protested against has received a majority of the votes cast thereon at the
election
[1965 c7 §35 17 240 Prior 1911 c 116 § 22, part, RRS § 9111, part ]
http //www leg wa gov/RCW /index cfm ?fuseaction= Section &Section =35 17 240 &printver 4/23/2004
Page 1 of 1
ti
RCW 35.17.250
Legislative -- Referendum -- Petitions and conduct of elections.
All provisions applicable to the character, form, and number of signatures required for an
initiative petition, to the examination and certification thereof, and to the submission to the
vote of the people of the ordinance proposed thereby, shall apply to a referendum petition
and to the ordinance sought to be defeated thereby
[1965 c 7 § 35 17 250 Prior 1911 c 116 § 22, part, RRS § 9111, part ]
http //www leg wa gov/RCW /index cfm ?fuseaction= Section &Section =35 17 250 &printver 4/23/2004
Page 1 of 1
RCW 35.17.260 '25-7. 2 3 g
Legislative -- Ordinances by initiative petition.
Ordinances may be initiated by petition of registered voters of the city filed with the
commission If the petition accompanying the proposed ordinance is signed by the
registered voters in the city equal in number to twenty -five percent of the votes cast for all
candidates for mayor at the last preceding city election, and if it contains a request that,
unless passed by the commission, the or inance e submitted to a vote of the registered
voters of the city, the commission shall either
(1) Pass the proposed ordinance without alteration within twenty days after the county
auditor's certificate of sufficiency has been received by the commission, or
(2) Immediately after the county auditor's certificate of sufficiency for the petition is
received, cause to be called a special election to be held on the next election date, as
provided in *RCW 29 13 020, that occurs not less than forty -five days thereafter, for
submission of the proposed ordinance without alteration, to a vote of the people unless a
general election will occur within ninety days, in which event submission must be made on
the general election ballot
[1996 c 286 § 4, 1965 c 7 §35 17 260 Prior 1911 c 116 § 21, part, RRS § 9110, part ]
NOTES:
*Reviser's note: RCW 29 13 020 was recodified as RCW 29A 04 330 pursuant to
2003 c 111 § 2401, effective July 1, 2004
http //www leg wa gov/RCW /index cfm Section &Section =35 17 260 &printver 4/23/2004
Page 1 of 1
RCW 35.17.270
Legislative -- Initiative petition -- Submission procedures.
The petitioner preparing an initiative petition for submission to the commission shall
follow the procedures established in RCW 35 21 005
[1996 c 286 § 5, 1965 c 7 § 35 17 270 Prior (1) 1911 c 116 § 21, part, RRS § 9110, part (») 1911 c 116 §
20, part, RRS § 9109, part (111) 1911 c 116 § 24, RRS § 9113 ]
http / /www leg wa gov/RCW /index cfm ?fuseaction= Section &Section =35 17 270 &printver 4/23/2004
Page 1 of 3
RCW 35.21.005
Sufficiency of petitions.
Wherever in this title petitions are required to be signed and filed, the following rules shall
govern the sufficiency thereof
(1) A petition may include any page or group of pages containing an identical text or
prayer intended by the circulators, signers or sponsors to be presented and considered as
one petition and containing the following essential elements when applicable, except that
the elements referred to in (d) and (e) of this subsection are essential for petitions referring
or initiating legislative matters to the voters, but are directory as to other petitions
(a) The text or prayer of the petition which shall be a concise statement of the action or
relief sought by petitioners and shall include a reference to the applicable state statute or
city ordinance, if any,
(b) If the petition initiates or refers an ordinance, a true copy thereof,
(c) If the petition seeks the annexation, incorporation, withdrawal, or reduction of an
area for any purpose, an accurate legal description of the area proposed for such action and
if practical, a map of the area,
(d) Numbered lines for signatures with space provided beside each signature for the
name and address of the signer and the date of signing,
(e) The warning statement prescribed in subsection (2) of this section
(2) Petitions shall be printed or typed on single sheets of white paper of good quality
and each sheet of petition paper having a space thereon for signatures shall contain the text
or prayer of the petition and the following warning
WARNING
Every person who signs this petition with any other than his or her true name,
or who knowingly signs more than one of these petitions, or signs a petition
seeking an election when he or she is not a legal voter, or signs a petition
when he or she is otherwise not qualified to sign, or who makes herein any
false statement, shall be guilty of a misdemeanor
Each signature shall be executed in ink or indelible pencil and shall be followed by the
name and address of the signer and the date of signing
(3) The term "signer" means any person who signs his or her own name to the petition
http //www leg wa gov /RCW /mdex cfm ?f iseaction= Section &Section =35 21 005 &printver 4/23/2004
Page 2 of 3
(4) To be sufficient a petition must contain valid signatures of qualified registered
voters or property owners, as the case may be, in the number required by the applicable
statute or ordinance Within three working days after the filing of a petition, the officer
with whom the petition is filed shall transmit the petition to the county auditor for petitions
signed by registered voters, or to the county assessor for petitions signed by property
owners for determination of sufficiency The officer or officers whose duty it is to
determine the sufficiency of the petition shall proceed to make such a determination ' with
reasonable promptness and shall file with the officer receiving the petition for filing a
certificate stating the date upon which such determination was begun, which date shall be
referred to as the terminal date Additional pages of one or more signatures may be added
to the petition by filing the same with the appropriate filing officer prior to such terminal
date Any signer of a filed petition may withdraw his or her signature by a written request
for withdrawal filed with the receiving officer prior to such terminal date Such written
request shall so sufficiently describe the petition as to make identification of the person
and the petition certain The name of any person seeking to withdraw shall be signed
exactly the same as contained on the petition and, after the filing of such request for
withdrawal, prior to the terminal date, the signature of any person seeking such withdrawal
shall be deemed withdrawn
(5) Petitions containing the required number of signatures shall be accepted as prima
facie valid until their invalidity has been proved
(6) A variation on petitions between the signatures on the petition and that on the
voter's permanent registration caused by the substitution of initials instead of the first or
middle names, or both, shall not invalidate the signature on the petition if the surname and
handwriting are the same
(7) Signatures, including the original, of any person who has signed a petition two or
more times shall be stricken
(8) Signatures followed by a date of signing which is more than six months prior to the
date of filing of the petition shall be stricken
(9) When petitions are required to be signed by the owners of property, the
determination shall be made by the county assessor Where validation of signatures to the
petition is required, the following shall apply
(a) The signature of a record owner, as determined by the records of the county auditor,
shall be sufficient without the signature of his or her spouse,
(b) In the case of mortgaged property, the signature of the mortgagor shall be sufficient,
without the signature of his or her spouse,
(c) In the case of property purchased on contract, the signature of the contract
purchaser, as shown by the records of the county auditor, shall be deemed sufficient,
without the signature of his or her spouse,
(d) Any officer of a corporation owning land within the area involved who is duly
authorized to execute deeds or encumbrances on behalf of the corporation, may sign on
behalf of such corporation, and shall attach to the petition a certified excerpt from the
bylaws of such corporation showing such authority,
http //www leg wa gov/RCW /index cfm Section &Section =35 21 005 &prmtver 4/23/2004
Page 3 of 3
(e) When property stands in the name of a deceased person or any person for whom a
guardian has been appointed, the signature of the executor, administrator, or guardian, as
the case may be, shall be equivalent to the signature of the owner of the property, and
(f) When a parcel of property is owned by multiple owners, the signature of an owner
designated by the multiple owners is sufficient
(10) The officer or officers responsible for determining the sufficiency of the petition
shall do so in writing and transmit the written certificate to the officer with whom the
petition was originally filed
[2003 c 331 § 8, 1996 c 286 § 6 ]
NOTES:
Intent -- Severability -- Effective date -- 2003 c 331: See notes following RCW
35 13 410
http / /www leg wa gov/RCW /index cfm ?fuseaction= Section &Section =35 21 005 &printver 4/23/2004
Page 1 of 1
RCW 29.79.090
Petitions to legislature -- Form. (Effective until July 1, 2004.)
Petitions for proposing measures for submission to the legislature at its next regular
session, shall be substantially in the following form
WARNING
Every person who signs this petition with any other than his or her true name,
knowingly signs more than one of these petitions, signs this petition when he or she is not
a legal voter, or makes any false statement on this petition may be punished by fine or
imprisonment or both
INITIATIVE PETITION FOR
SUBMISSION TO THE LEGISLATURE
To the Honorable , Secretary of State of the State of Washington
We, the undersigned citizens and legal voters of the State of Washington, respectfully
direct that this petition and the proposed measure known as Initiative Measure No
and entitled (here set forth the established ballot title of the measure), a full, true, and
correct copy of which is printed on the reverse side of this petition, be transmitted to the
legislature of the State of Washington at its next ensuing regular session, and we
respectfully petition the legislature to enact said proposed measure into law, and each of us
for himself or herself says I have personally signed this petition, I am a legal voter of the
State of Washington in the city (or town) and county written after my name, my residence
address is correctly stated, and I have knowingly signed this petition only once
Petitioner's Print name Residence address, City
signature for positive street and number or County
identification if any Town
(Here follow 20 numbered lines divided into columns as below )
1-- - - - -- -- - --- -- -- -- -- -- -- -- - - - --- - - - - - -- -- -- - - --
2--------- ------ -- - - -- ------ - - - --- - -- - - -- -- - - ----
3--------- ----- - - - ---- --- --- -- - - -- --- -- -- -- - - - - --
etc
[1982 c 116 § 9, 1965 c 9 § 29 79 090 Prior 1913 c 138 § 5, part, RRS § 5401, part 1
http / /www leg wa gov/RCW /index cfm ?fuseaction= Section &Section =29 79 090 &printver 4/23/2004
Page 1 of 1
RCW 35.17.280
Legislative -- Initiative petition -- Checking by clerk.
Within ten days from the filing of a petition submitting a proposed ordinance the city clerk
shall ascertain and append to the petition his certificate stating whether or not it is signed
by a sufficient number of registered voters, using the registration records and returns of the
preceding municipal election for his sources of information, and the commission shall
allow him extra help for that purpose, if necessary If the signatures are found by the clerk
to be insufficient the petition may be amended in that respect within ten days from the date
of the certificate Within ten days after submission of the amended petition the clerk shall
make an examination thereof and append his certificate thereto in the same manner as
before If the second certificate shall also show the number of signatures to be insufficient,
the petition shall be returned to the person filing it
[1965 c 7 § 35 17 280 Prior (1) 1911 c 116 § 20, part, RRS § 9109, part (u) 1911 c 116 § 21, part, RRS §
9110, part ]
http / /www leg wa gov/RCW /index cfm Section &Section =35 17 280 &prmtver 4/23/2004
Page 1 of 1
RCW 35.17.290
Legislative -- Initiative petition -- Appeal to court.
If the clerk finds the petition insufficient or if the commission refuses either to pass an
initiative ordinance or order an election thereon, any taxpayer may commence an action in
the superior court against the city and procure a decree ordering an election to be held in
the city for the purpose of voting upon the proposed ordinance if the court finds the
petition to be sufficient
[1965 c 7 § 35 17 290 Prior (j) 1911 c 116 § 20, part, RRS § 9109, part (n) 1911 c 116 § 21, part, RRS §
9110, part ]
http / /www leg wa gov/RCW /index cfm Section &Section =35 17 290 &printver 4/23/2004
Page 1 of 1
RCW 35.17.300
Legislative -- Initiative -- Conduct of election.
Publication of notice, the election, the canvass of the returns and declaration of the results,
shall be conducted in all respects as are other city elections Any number of proposed
ordinances may be voted on at the same election, but there shall not be more than one
special election for that purpose during any one six -month period
[1965 c 7 § 35 17 300 Prior (1) 1911 c 116 § 20, part, RRS § 9109, part (n) 1911 c 116 § 21, part, RRS §
9110, part ]
NOTES:
Canvassing returns, generally Chapter 29A 60 RCW
Conduct of elections -- Canvass RCW 29A 60 010
http //www leg wa gov /RCW /index cfm ?fuseaction= Section &Section =35 17 300 &printver 4/23/2004
Page 1 of 1
RCW 35.17.310
Legislative -- Initiative -- Notice of election.
The city clerk shall cause any ordinance or proposition required to be submitted to the
voters at an election to be published once in each of the daily newspapers in the city not
less than five nor more than twenty days before the election, or if no daily newspaper is
published in the city, publication shall be made in each of the weekly newspapers
published therein This publication shall be in addition to the notice required in *chapter
29 27 RCW
[1965 c 7 § 35 17 310 Prior 1911 c 116 § 21, part, RRS § 9110, part ]
NOTES:
*Reviser's note: RCW 29 27 0665, containing ballot title notice requirements, has
been recodified as RCW 29A 36 080 pursuant to 2003 c 111 § 2401, effective July 1,
2004
http //www leg wa gov /RCW /index cfm ?fuseaction= Section &Section =35 17 310 &prmtver 4/23/2004
Page 1 of 1
RCW 35.17.330
Legislative -- Initiative -- Effective date -- Record.
If the number of votes cast thereon favor the proposed ordinance, it shall become effective
immediately and shall be made a part of the record of ordinances of the city
[1965 c7 § 35 17 330 Prior 1911 c 116 § 21, part, RRS § 9110, part]
http / /www leg wa gov /RCW /index cfm'?fuseaction= Section &Section =35 17 330 &prmtver 4/23/2004
Page 1 of 1
RCW 35.17.340
Legislative -- Initiative -- Repeal or amendment.
Upon the adoption of an ordinance initiated by petition, the city clerk shall write on the
margin of the record thereof "ordinance by petition No ," or "ordinance by vote of the
people," and it cannot be repealed or amended except by a vote of the people
[1965 c7 §35 17 340 Prior 1911 c 116 § 21, part, RRS § 9110, part]
http / /www leg wa gov/RCW /index cfm ?fuseaction= Section &Section =35 17 340 &prmtver 4/23/2004
Page 1 of 1
RCW 35.17.350
Legislative -- Initiative -- Repeal or amendment -- Method.
The commission may by means of an ordinance submit a proposition for the repeal or
amendment of an ordinance, initiated by petition, by submitting it to a vote of the people at
any general election and if a majority of the votes cast upon the proposition favor it, the
ordinance shall be repealed or amended accordingly
A proposition of repeal or amendment must be published before the election thereon as
is an ordinance initiated by petition when submitted to election
[1965 c 7 § 35 17 350 Prior 1911 c 116 § 21, part, RRS § 9110, part ]
http / /www leg wa gov/RCW /index cfm ?fuseaction= Section &Section =35 17 350 &printver 4/23/2004
Page 1 of 1
a •
RCW 35.17.360
Legislative -- Initiative -- Repeal or amendment -- Record.
Upon the adoption of a proposition to repeal or amend an ordinance initiated by petition,
the city clerk shall write upon the margin of the record of the ordinance "repealed (or
amended) by ordinance No ," or "repealed (or amended) by vote of the people "
[1965 c 7 § 35 17 360 Prior 1911 c 116 § 21, part, RRS § 9110, part
http / /www leg wa gov/RCW /index cfm ?f iseaction= Section &Section =35 17 360 &printver 4/23/2004
Karen Flynn
Kitsap County Auditor - Elections & Voter Registration
NINEW 1026 Sidney Avenue, Suite 175 • Port Orchard, Washington 98366 -4678
Telephone (360) 337 -7128 • Facsunile (360) 337 -5769
Add Anwoola
Financial Services Manager
Jul 1 2004 Winnie Flores -Logan
Y Chief Deputy Auditor
City of Bremerton
Attn Paula Johnston
239 Fourth Street
Bremerton WA 98337
Dear Paula Johnston
In preparation for the fall elections, enclosed is your copy of the Election Guidelines for 2004
Filing week begins July 26 and ends July 31" Offices open for election, as of this writing, are
listed on page 14 thru page 15
We are pleased to advise you that our office will be producing a Local Voters' Pamphlet for the
2004 Primary and General Elections as well as an online Local Voters' Guide Anyjunsdiction
with a measure on the ballot is included The intent of the Local Voters' Pamphlet is to provide
citizens of Kitsap County with informative and objective information regarding ballot measures
Local Voters' Pamphlets are distributed to each household approximately twenty days prior to
the election The costs associated with publication of the Local Voters' Pamphlet are prorated
among all districts in the same manner as other election costs This notification to all
jurisdictions of publication of a Local Voters' Pamphlet is pursuant to RCW 29A 32 220
If your district is planning to run any ballot measures in the year 2004, please remember to
formally appoint committees to prepare the appropriate statements No later than 45 days prior
to the date of the election, you will need to appoint one committee advocating the voters'
approval of the measure and one committee advocating the voters' refection of the measure
If you have any elections questions, please feel free to call Suzanne Boltz at (360) 337 -7128,
(253) 851 -4147 from Olalla or (206) 842 -2061 from Bainbridge Island
Since ly,
N FLYNN
Kitsap County Auditor
Enclosure
Administration Accounts Payable Payroll Vehicle Licensing Public Records
(360) 337.7129 (360) 337 -7122 (360) 337 -7123 (360) 337 -4440 (360) 337 -4935
Fax 3374645 Fax 337 -7016 Fax 337 -7016 Fax 337 -4645 Fax 337 -4645
Toll Free from Olalla 851 -4147 • Bainbridge Island 842 -2061
RECEIVkD
OFFICE OF CITY CLERK
DAME k/ga TIME_
July 12, 2004
MRAITME
Ms Paula Johnston, City Clerk
City of Bremerton
239 - 4th Street
Bremerton, Wa 98337
RE INITIATIVE #101
SIGNATURES
Dear Ms. Johnston:
We are delivering to you, in accordance with instructions from the City
Attorney, Mr Roger Lubovich, with this letter, initiatives regarding any
proposal to build a transit tunnel in downtown Bremerton. The petitions
contain 3,125 (THREE THOUSAND ONE HUNDRED TWENTY FIVE)
signatures, which appears to be more than the number necessary to place this
initiative on the November 2, 2004 ballot.
It is requested that you acknowledge receipt by your official date stamp on
our photocopied set
We trust that you and your office will keep the names of the signatures on the
initiatives at the highest degree of confidentiality and they will not be
available to anyone except you as the City Clerk and the City of Bremerton
Attorney, Mr. Roger Lubovich before submitting them to the County
Elections Office.
Very truly yours,
CATT
1116r
e
I u vo-
11 WaAIA
��
13
2! �Z -0
aa-9, - 7 9,
Z z
-17A A
V24
JP
i
1
V
Qr-
35.17.200 Legislative —A ro riations of move . thereof initiati p s s on the t o the exa mina t ion
of people of
certification tification
No money shall be appropriated except by ordinance and the ordinance proposed thereby, shall apply to a referendu
every such ordinance complete in the form: in which it is petition and to the ordinance sought to be defeated thereby ,
finally passed shall remain on file with the city clerk for [1965 c 7 § 35 17 250 Prior 1911 c 116 § 22
public inspection at least one week before final passage, § 9111, part] ' part, RRS i= '
[1965 c 7 § 35 17 200 Prior 1911 c 116 § 16, part, RRS
§ 9105, part,] „
35.17.260 Legislative — Ordinances by initiative {
35.17.210 Le petition. Ordinances may be, initiated by petition of regis-
gislative— Street improvements. Every tered voters of the city filed with the commission he
ordinance or resolution ordering any street improvement or petition accompanying the proposed ordinance as signed If the by sewer complete in the form in which it is finally passed shall the registered voters in the city equal in number to twenty-
remain on file with the city clerk for public 'inspection at five percent of the votes cast for all candidates for ma or at
y
least one week before final passage [1965 c 7 § 35 17 210 the last preceding city election, and if it contains a request
Prior 1911 c 116 § 16, part, RRS § 9105, part ] that, unless'passed by the commission, the ordinance be �
submitted to a vote of the registered voters of the city, the #
35.17.220 Le Franchises — .Referendum. commission shall either 1
No franchise or right to occupy or use the streets, highways, (1) Pass the proposed ordinance without alteration
bridges or other public places shall be granted, renewed, or within twenty days after the county auditor's certificate of
extended except by ordinance and every such ordinance sufficiency has been received by the commission, or
complete in the form in which it is finally passed shall ( Immediately after the county auditor's certificate of
remain on file with the city clerk for at least one week sufficiency for the petition is received, cause to be called a
before final passage and if the franchise or grant is for special election to be held on the next election date, as
interurban or street railways, gas or water works, electric provided in RCW 29 13 020, that occurs not less than forty -
hght or power plants, heating plants, telegraph or telephone five days thereafter, for submission of the proposed ordi-
systems .or other public service utilities, the ordinance must nance without alteration, to a vote of the people unless a
be submitted to a vote of the people at a general or special general election will occur within ninety days, in which
election and approved by a majority of those voting thereon event submission must be made on the general election
[1965 c 7 § 35 17 220 Prior 1911 c 116 § 16, part, RRS ballot [1996 c 286 § 4, 1965 c 7 § 35 17 260 Prior 1911
§ 9105, part ] c 116 § 21, part, RRS § 9110, part ]
[Title 35 RCW —page 481
(2002 Ed)
14
-39 ®� r 15
16
17 -7
18
19
MAIL COMPLETED PETITIONS TO:
C F C C Citizens For Common Cents, 25227 Reath Road, Kent, Washington 98032
Call 253 -941 -9869 or 253- 859 -5286 or Fax 253- 856 -0383