5001
SVR DESIGN COMPANY
Pacific Ave Improvements - Conceptual to 30% Design
Engineering
LEG 12-1
12/15/2010
4/30/2011
3/31/2011
Comments
Pve��c �roRKS & ur���r�es
Engineering Divesion
December 15, 2010
Robert Parish, P E
SvR Design Company
1205 2° Avenue, Su�te 200
Seattle, WA 98101
� c VED
�-� [ � � 7
���G4�q1�:�_�' - ,
�
Sub�ect Pacific Avenue Improvements — Conceptual to 30% Des�gn
Dear Robert
� , y ;� �� r� �1 �� '�
� `
„ -, ,
� ����
C�� �
z
�' �- '� , , -- '�
Th�s letter contract provides for mter�m phase of design from conceptual to 30% des�gn as presented m the
atta.ched EaLhibrt A, "Scope of Services" Under the scope of services, tasks 3 and 4 w�ll be deleted Th�s
mterim phase will be paid on an hourly bas�s, m accordance wrth Exh�b�t B, "Pacific Avenue Inter�m Task
Role Fee" The total amount of th�s letter contract �s not to exceed $16,000
If SvR agrees to the above terms, please mdicate acceptance by s�gnmg below where md�cated if you have
any quest�ons or concerns, please contact me at (360) 473-2317
Smcerely,
G �i�..
Eduardo Aban, P E
Pro�ect Engmeer
SvR agrees to the above terms
SvR Design Company
��
By
T von Schrader
Prmcipal
C�ty of Bremerton
B `"'
Vmcent Akhim�e, CPM, P E
Publ�c Works and Utilrties D�rector
i2�o-zz
Eduardo Aban
a '" Pac�fic Avenue Improvements — Conceptual through 30% Design
December l3, 2010
Page 2 of 4
EXNig�Z �4
SCOPE OF SERVICES
Task 1— Iuterim Storm Drainage and LID Desien Plans, SpeciCcations $11.370 �
Ob�ectrve Revie�v ex�st�ng site �nfonnatlon and evaluate/identify possible LID des�gn options
for Pac��c Avenue and to prov�de a basis for the street corridor redevelopment.-
�1clrvrtres
• Atteadance at a design kickaff ineeti��g/des�gn teani charrette to deve(op initial Des�gn
Concept.
• Review of existing reports, studies ai�d design plai�s. Siimmar�ze �nissing data appl�cable
to the Pacific Avenue corr�dor
• Attend �aeekly design coordination meetings, prov�de progress reports - assumes 4
meetings (2 �n Bremerton and 2 via teleconference}
• Develop Internn Storm Drainage Report and a list of LID/Sustainable options
Delrverables
➢ Part�c�pahon m the design k�ckoff ineetmg/design team charrette
➢ Summar�zat�on of missing and/or incomplete background data
➢ Participation m weekly des�gn coord�nat�on meetings, provide meetmg progress reports
of d�scuss�o�is.
➢ Inter�m Stoi�n Drainage Report.
➢ List of storniwater and pav�ng LID/Sustau�able options
�ssr�mp�rons
o Des�gn kickoff ineeting/design tea�n charrette �s auticipated to be a 6 to 8 hour event
o SvR's pro�ect manager to attend both tite Bremerton �neet�ngs and teleconference
meetings SvR's design team �vill on(y attend the teleconference meetmgs
o No Des�gn plans or Specifications �vill be developed for this phase
Task 2— Interim Landscane DesiQn Plans. Specifications $314d
Ob�ective Rev►ew ex�sting s�te �nformation aiid evaluate poss�ble Landscape Des�gn options
for u�tegrahon of L1D landscape features withm the Pac�fic Avenue corridor.
Actrothes
• Attendance at a design k�ckoff u�eeting/desig�i telm charrette to develop mitial Des�gn
Concept.
• Attend 2 teleconfe►ence des�gn coordination �neeh:�gs
• Develop a hst of Landscape LID/Sustatnabte options
Deln�eraGles
➢ Aart�cipation in the design k�ckot'f ineeting/design team charrette.
➢ Ltst of IAndscape related LID/Sustainable options
flsstu�tplrof�s
Thts doctr»rert� rs proprretary n joi ntatro�t pr ep�red by SvR fo� �lus p� oJec! onh� and shall �rot 8e
fa�var�led, copred or irsed by other partles tivtlhoull�� ttte» �erm�ssron
F 1FCCS & CONTRACT'S120101Pac�fic A��e-f3remertonlPnc►fic Ave proposal let - 30%des�g�i - rev doc
�
i
� Eduardo Aban
� ' Pacific Avenue Improvements — Conceptual d�rough 30% Design
December 13, 2010
Page 3 of 4
o Design kickoff ineet�ng/design team charrette is antic�pated to be a b to 8 hour event
o No Design plans or Spec�ficatiosis w�ll be developed for this phase.
�4—
Ob1ectrve Revie�v existi��g site information and evaluate possible Irrigation Design options for
�ntegrat�on of LID �rrigation features witl�in the Paci�c Avenue corridor
Activtlres
� Develop a list of Irrigatian LID/Sustamable opt�ons
Delrve►ables.
➢ L�st of irrigat�on related L1D/Susta�i�able opt�ons
f1SSilIYi�l101tS
o No Design plans or Spec�fications �vi11 be develaped for tl�is pl�ase
o Irr�gation related LID/Sustamable options to be revie�ved dur�ng participation of design
k►ckoff meet�ng/des�g�i team cl�arrette
See attached fee provided by Tres-West
Task 5— Interim Cost estimates for Storm Drai�aaee, LID Desi�n, Landscane. Irrieation
51.522
Objeclrve Utitize the Pacific Avenue redevelopment des�gn concept from d�e des�gn kickoff
meeting/design teatn ci�arrette to develop 1n interun pt�ase estimate of probable construction
costs
Actrvities
• Concept level estimate of probable cost for chosen desigu concept
Del�vejables'
➢ Concept teve! estimate of p�obable cost estimate
Assr�nrptio»s.
o Cost esttmate will idantify iten3s witl��n SvR scope and ►vil) be based upon ihe chosen
des�gn coucept
o Cost est�mate �vill be m an "o�der of magn�tude" format
Th�s docunre�tt ts propi �eta�y urfornralrai p� epa� ed b}� SvR for thls proJect only and shall nv� be
foris�n� dect, cop�ed oi r�sed by oilter pnr ires tiarthotrt w� tlteit pe»»rssion
F iFEES & CONTRACTS120101Pacific Ave-BremertonU'aafic Ave proposnl let - 34% design - rev doc
0
Eduardo Aban
� ' Pacific Avenue Improvements — Conceptual through 30% Des�gn
- December 13, 2010
Page 4 of 4
FEE
For tl�e scope oFserv�ces described above, SvR shall be paid a lump sum per task above �v�th
and allowance of $843 for reimbursables. Tl�e hours per task are outlmed witlim the attacl�ed
Please s�gn and return one copy of tli�s letter to confirm our agreement. We look fonvard to
�vorkmg wrth you on this pro�ect
Sincerely,
SvR Design Compan
���/ V��
Tam von Schr�der
Pr�ncipal
ACCEPTED:
Name
Pnnt Name
T�tle.
Date
Tlrrs documen! rs pi op> >eta►y utfol•ntntrort prepared by SvR for rJrrs p� oJecr o�11y and shall not be
for�vrn ded, copied a use�! by o�he� pt,rlres x�rthauJ wrr!!en �e� nuss�on
N 1F�.ES & COA}i'RACTS120101Pacific Ave-CiremertontPacific Ave proposat !et - 30% design - rev doc
Pacfic Avenue Intenm Task-Role-Fee —� f N l 31 t(�
For C�ty of Bremerton
By SvR Design Company �ate 12-10-12
Descnpbon
1-
0
Print Date 72/13/2010
P�oposed
Fee
> 11.370
f � ���
,
. d; ,. � r � 4 51!`, ` Z^jj J'.
tt ��>��t� =�1� �`(� e.
, �
+� i ��
���'�'� � <��.F.,ti�1.' I ` � 1
���� F �i'7 � Ms�,� J;�
' �fi��ri a���� �
EsUmated Hours
ia � � �
� � tu .� y
� a � � �
�
� � N � Ch
.- r- r- r -
� � � � �
120 40 480 2S0
70 140 00 00
�
-,t
rn
�
�
40
t
1�
�
U
r�rr.
N
�
�
00
00
rx
N
Q
�
�
�
1 of 1