HomeMy WebLinkAbout5000 Contract Number 5000
Vendor PARAMETRIX
Subject Pacific Ave Improvements - Utility Coordination &
Environmental Permitting
Department Engineering
File Class LEG 12 -1
Begin Date 12/15/2010
End Date 4/30/2011
Review Date 3/31/2011
Vault Date
Comments
r
Engineering Division
December 15, 2010
Phil Struck, P E
Parametrix, Inc
4660 Krtsap Way
Bremerton, WA 98312
Tel 360 473 5270
Fax 360 473 5398
3027 Olympus Drlve
Bremerton, WA 98310
Sub�ect Pacific Avenue Improvements — Util�ty Coordmation for Overhead Wire Underground Conversion
and Environmental Perm�tting
Dear Phil
Th�s letter contract prov�des for util�ty coordmahon and permrt applications as presented m the attached
E�chibrt A, "Scope of Work" This work will be patd on an hourly basis, m accordance wrth Exh�brt B,
"Budget Estimate" The total amount of th�s letter contract is not to exceed $24,000
If Parametrix agrees to the above terms, please mdicate acceptance by signmg below where mdicated if you
have any yuestions or concerns, please contact me at (360) 473-2317
Smcerely,
��� `�.d"'�
Eduardo Aban, P E
Pro�ect Engmeer
Parametrix agrees to the above terms
Parametrix, Inc
By
Brian Bunker
Prmc�pal
City of Bremerton
:
V �-
Vmcent Akh�m�e, CPM, P E
Public Works and Util�ties D�rector
1210-21 \
pveLic woRKS s ur�LrriEs
EXH I BIT A
__- �
City of Bremerton
Pacific Avenue Improvements
Early Utility Coordination and Permit Ap�lications
INTRODUCTION
The Pacific Avenue Improvements pro�ect consists of roadway, non-motonzed transportation and
stormwater improvements on Pacific Avenue between 6`� Street and 11`� Street This Scope of Work
covers short term early action work achvrties associated with undergroundmg of utilrt�es and applications
for environmental permits The followmg tasks are associated with this Scope of Work
Task 1 Early Utility Coordination
Objective: Coordmate with Puget Sound Energy (PSE) and other applicable utility providers for
undergroundmg of exishng uril�hes consistent wrth PSE Schedule 74
Activihes: The following activities are associated wrth th�s task
• Meet wrth the Crty and define goals and ob�echves for utility work elements,
mcludmg commumcation procedures, deliverables, milestones and schedule
• Prepare a draft Scope of Work consistent wrth PSE Schedule 74 for review by the
City followed by submittal to PSE The purpose of the draft Scope of Work will be
to mrtiate the Design Agreement process wrth PSE The draft Scope of Work will
contam the followmg mformation
-➢ A text descnption of the proJect and facilrties that would be converted to
underground
➢ A prelimmary schedule for the conversion pro�ect and a list of milestones
➢ A schematic plan of the pro�ect that shows generalized pro�ect elements and
limrts, and a typical cross section
➢ A statement regardmg whether the City mtends to install ducts and vaults as
part of the pro�ect
• Coordmate and facilrtate up to two meehngs with the City and/or PSE and other
ut�lrty providers to review the draft Scope of Work, mdentify additional data needs,
and discuss PSE's proposed design cost estimate, schedule and other elements of the
final Scope of Work and Des�gn Agreement
� Contact other utility agencies and mihate commwucahon regardmg the pro�ect and
underground conversion This may mclude discussion of a Jomt Uhhty Trench
(JUT) that is used for all "dry" utilrties (power, gas, telephone, cable)
Ciry ofBremerton 237-1896-853
Pacrfec Avenue Improvements 1 December 03, 2010
• Coordmate with the City and PSE to confirm the process to convert power feeds for
all customers mcludmg work to be conducted outside of the right of way Prepare a
Techmcal Memorandum (TM) that descnbes the proposed process, schedule,
responsibilrties and a customer commumcation/notification plan associated with
connecrion of customer service lmes to the pomt of connechon of PSE's underground
system
Deliverables: T'he followmg deliverables will be prepared
• Kick off ineetmg agenda and supportmg mformation mcludmg schedule and
schematic plan
• One hard copy and one pdf copy of the Draft Scope of Work for review by the City
Followmg City review and comment, submit the Draft Scope of Work to PSE
• Agendas and notes for up to two utilrty related meetmgs
• One hard copy and one pdf copy of the Techmcal Memorandum (TM) descnbmg the
expected customer conversion process, schedule and recommended commurucation
and notification plan
Assumptions: The followmg assumpt�ons apply to this task
• The duration of the early action portion of utility coordmation task is two months
• Further utilrty coordmation will be necessary beyond the scope of this task This
additional coordmation would be addressed under a future scope of work and may
mclude work wrth PSE, customer conversion coordmahon, and coordmation of a NT
agreement
� The schematic plan will consist of one sheet showmg the general streetscape plan and
a typical section The schematic plan will be based on the concept shown m
Attachment "A"
• The schematic plan will be prepared on a base map provided by the Crty The base
map will be m a CADD drawmg file format, will contam all necessary reference
pomts and will show all exishng ut�lrties
� The customer conversion TM will be approximately 2 to 3 pages
Task 2 NEPA and SEPA Submittals, and ESA Compliance
Objective: Prepare an Environmental Classification Summary (ECS) form and Endangered Species
Act (ESA) "No Effects" letter for submittal to WSDOT (National Env�ronmental Policy
Act (NEPA) lead agency), and a SEPA Environmental Checklist for submittal to the Crty
of Bremerton (SEPA lead agency)
Activities: The followmg activities are associated wrth this task
Crry of Bremerton 23�-1896-853
Pacrfic Avenue Improvements 2 December 03 2010
(�
• Meet wrth the Crty and venfy perm�t scope, expected permrt subm�ttal requirements,
and schedule goal
• Contact WSDOT and discuss pro�ect scope, permit submittal requirements, and
estimated review schedule
• Prepare a one page Pro�ect Descnption text that descnbes the pro�ect location,
purpose, scope, and schedule
� Prepare an Area of Potential Effects (APE) map and text descnphon and submrt to
WSDOT for review and approval
• Gather mformahon on ESA-listed fish and wildlife species potentially present m the
pro�ect azea, based on available data, mcludmg the WDFW Pnonty Habitats and
Species database reports, and species lists from the U S Fish and Wildlife Service
(USFWS) and the Narional Manne Fishenes Service (NMFS)
• A qualified biologist w�ll conduct a srte visit and assess the potential for effects on
fish and wildlife species listed as threatened or endangered under the ESA This
assessment will be documented m a"No EffecY' letter, which will be submitted wrth
the ECS form
• Prepare an Environmental Classification Summary (ECS) form usmg mformation
from the ESA analysis and schemahc site plan as source matenal The draft ECS
will be submitted to the City for review before submittal to WSDOT
• Prepare a SEPA Checklist for submittal to the City
� Meet with the C�ty staff on one occasion to coordmate NEPA/SEPA process
De/iverables: T'he followmg deliverables will be prepared
• One hard copy and one pdf copy of the dra8 and final Pro�ect Descnption
• One hard copy and one pdf copy of the draft and fmal ESA "No Effects" letter
• One hard copy and one electromc copy of the draft and fmal ECS form
• One hard copy and one electromc copy of the draft and final SEPA Checklist
Assumptions: The followmg assumpt�ons apply to this task
� An air qualrty, wetland/stream study, cultural resources study, dramage report and/or
geotechrucal study will not be required for permit submittals
� There are no cultural or histonc resources or contaminated propert�es that will be
affected by the pro�ect
• The schematic plan developed in Task 1 will be sufficient to mrtiate permrt
applications
Crty of Bremerton 237-1896-853
Pac:fic Avenue Improvements 3 December 03, 2010
• The pro�ect area does not support suitable habrtat or designated cntical habrtat for
any species listed as threatened or endangered under ESA, and proJect activihes will
have no potential to affect any ESA-listed species Consultation with USFWS or
NMFS, therefore, will not be required
• The ESA No Effect letter w�ll be prepazed pursuant to the checklist and template
provided by WSDOT
• There will be no mcrease in impervious surfaces that will require water qualrty
analysis and modelmg pursuant to WSDOT-required ESA compliance
• Species proposed for listing (i e, not listed as threatened or endangered) will not be
mcluded m the evaluation No proposed, candidate, threatened, or endangered
species of plants will need to be addressed
• Further permit related activrties may be necessary beyond the scope of this task
These additional activrties would be addressed under a future Scope of Work
• No meetmgs wrth state or federal regulatory agencies are mcluded m the scope
Task 3 Miscellaneous Services
Objective: Provide addirional techmcal services as requested by the Crty
Activities: The followmg activihes may be associated with this task
• Coordmate and meet with the C�ty, ad�acent property owners, busmess
owners/groups, and other pro�ect stakeholders
• Prepare additional mformation to support urihty coordmation 1'his may mclude the
final PSE Scope of Work, the Design Agreement and review and comment on PSE
pro�ect plan
• Prepare addrtional permit related mformat�on or correspondence, and mamtam
contact wrth WSDOT and other agencies to ensure that the NEPA/SEPA process is
progressmg
Deliverables: T'he followmg deliverables will be prepared
• Correspondence, agendas and notes
• Other mformarion associated with directed services
Assumptions: The followmg assumptions apply to this task
• Up to 20 hours of labor may be provided under this task as shown m Budget Task 3
C�ty of Bremerton 237-1896-853
Pac fc Avenue Improvements 4 December 03, 2010
ATTACHMENT "A"
Cii.y of Bremerton
Pacific Avenue Road Improvements
6th to l lth Street
�, � _ __ _ ---- � _ -- � _ �-- �---��—.�-; �_ _ --- � ,�� �,, � �; � --- .�--�--- �—a,_ _ ---: .� ,w, .� � ,� �� � a�---- --� -�.--�---�-- _ _ � _ __ _,�--�,�
( � iF 7`�}, .._-� �..._� _ _--°� ; � �„�. ° �-,�� � " '� � �,. �`� .��"..�.anr`� a1.+�Q . $ "� -•-.. �� �,,.�,r..�� � .� . ,.�;"`"` .
� ����� +� . �� „ n I S_ �y�, i"" `�`�� � -^-{��� � � e�,'""'. � 5 e . ' ,`f � �i.'� t �� sg�t �� � '�" a { '�'`g,, 4 {
� � � c�,'> . �"-c" Xa _„"''- `'� � a, ' �� 'i���, u ` � �'� � �.-., y- � .'* °�✓"�„+.�-.7 c.� `€" � .g 6���T AF'u '�`t c � '� � � ! fi" -,k
�t..., � f "....z r, "'�� � { � !l J � � � � a � � � � ...... _ �� � d.� � � °�1," `, �"'y� � (� �
e,..... � ,;,_�_, ,,. 4 ,�: t ;,�1 ; 3* ,,,�._�r` ��° �' a.._�.,� -- � �� �� �, ....,,.c.� Y � .c^� -- -�s�s if' � ,t�' f`�"�
�'` _ , d $�s� `;�, "` �'"`"" `� �i �-� nn.. y + , J '� f���� � '� * .��,c� � `'�� "� r. � � 3`'' � �
� k � ( ` �`'�� s �1 �� L a � � � d [ S p � � � . T` 4 l �� � T s� �� p'�i ' �� �� .�w.�� � y ° � �� � �
ar�-x � 1... ,� '�'°' R�t��� n���� ,r � s,�,x ���& � :? � �e ", � r�,H.., �� + J..r , � 1L t �" ' �� ` � � s+y� ',� '} �i� � �� E„ � ''r i
� � A - g y µ � �.,,,_._P °� ���r g �_ � ..� _ >7� ¢ .a °iu ' Y� !3`ry e'.� T 6� 3 rv ;a ^�m r.'=q _� .y� '°'" `� '.-� ,.�,Y+=�
� 43yy��° �{ � � ..° `�
"`� t3� � i , --r � ac � ;'�ir'x�a 's r� b' � „ ,�,�,,r.,�;t »"� ,�� p,.�°�-�t_.;,,. �'_X'�^y� w 3� t � w ,."X".� r � �
� � i � �� Y � ^ jj � t Y R � � + r +i./ � � <� � �.r• ri' �8` 'S q "5 � ��� p � Y L � � rkt r+ � �, � rt � �' i # d C ��5 e�1+r k.:� Y� � � t~ 3� � 1 t�,.' i
( ��` _ � � ., , � L � � � ,� „� � �s �' � fl �� � � ���?. - a' +�� � y `� � j � { .$.�` „�; i � � 1, t� c 1� {'�� a� < � � � 5
5 � rv �_ , 1 �,. ;� � � �" . f f � t� v �, 3 , � � � , }; ' '�"' -� �`
� �� � � � �{ �S �'}� > � � i� s ,�r-..«� �.. + �1� 7 � R �,,,, ?' i ^—�' .,� y � �`� a_ � �� w � .,.E' � r t �
� , ' ""'°a t�i ` � ,.f' ,� 1 � n ° �-.r � L ,. �. .,.�a � �. �. � ''.��`�` � v � i f\ i � tA�, � � 1 � �u S ., �..� a _ ` �
� �.a�.'-.'S� y ,,,..'Y.A_` � i � � � ,�3 ' 3 s' ".-` 7 �f°° � � F ��� 1� � d ' » �� �
�` � � ] r C R r w }
� 1�7 � se" � � ..�r' ..« � �_.--,..Nm,.� 'L,.� �.� " , F ..^' ,s *�..� � ? `-�' � � Y' f "''.��' y � .. '�.,- i.A (
z � S �` ",mr.._3 ,.�.c_-`_�.W.,,,�.,. v ��....--d.� �a .r 1 - d".��-.....-.. �•a„r � ..ti zF
� � � , ..� � ��i�...e 1 � S;a�/ca � � .> ���� �� �x���� �,�.,^` �'� � g � � j4.-E a.'� �� {��- � �e�,�� �
� � �� � � ��i � � � S� � � �.�`.,' '� �ti� � � .� � a _'"R � I. ,f ) �a. �z� � P�oZO D' � �� 1 �,
i � P �'[� { � _".�
� w�wee�wa f # - � � -� � P .!{ � "'y � "�*� � � ! i � '" i..- �� k�� � � �.�x � ~ "'"'��` � �j � � O�111f�*� (1
ru� � " t ` ` .. �� C
'g . � � � < c�, t �� (� C + ��` ��'� �, � � '�+. 1.�.,� � � �, ar'p ��L 1 � � d� 4 4
'^_ �f. �� i "�t b�i ' � il t � � • G i {�` � �_ 8 4 "T*�'� f j b � p k` }� : r"�i� 1 ���, �-
; . � F
� , , r
�
�, „ p�"x� « J " �e r
§'x
1
� ---�-�� w� �� ����.�-� � ..�.�.� �� � �� �
, �
c-�, �'°` �.,,. � _.�� t � "�
� � � J � ! � l� �.�G✓'"�,-__ �, ' � .
'Y .
,� . � ` � � � '" � � ��' � . '� - f -
�-�� ` `� � � ,�" � � ���' ��� � � � �
� t� � � � ��� _ . _ a„`� �, :wc �..�'"' '. �� '� :,
�- - a
� � � � w�
'�.. � ,� ''»«a''""
� � � �� �
� 4 .x
�, ����� f � � ' �n��'
€�.
�� �0`�� �� -____
���� Parametr�x
'� �
.�}"
I z.., ���
"i" �n°.�:
i �� � �
� � .ai
.�
���
=D
i i 2� soio
PARAMETRIX BUDGET ESTIMATE Fortn01-PD-41/Rev o„�
PROJECT Pacific Avenue Improvements - Early Utility Coorindation and Permits
CLIENT BREMERTON
EXH I BIT B
PMX # g�wry� Biolog�sUPla
MULTIPLIER STAFF Pro�ed Manager Pro�ect Engineer nner CADD Pro� Coord
234-2237-829 7o7AL BASE TO7AL
PHASE 7ASK ORG CoDE 310 BILL RATES $50 00 $45 00 $35 00 $28 00 $23 00 HOURS Cosl C0.ST
1 1 Utdi Coondna�on
Mtgs and Coordmation 8 8 6 22 $898 00 $2,784
Schematic plan 2 8 8 18 $684 00 $2,120
Draft Scope oi Work 4 8 12 $560 00 $1,736
Other u�ldy coordmahon 2 4 6 $280 00 $868
Customer conversation TM 4 8 12 $560 00 $1,736
Subtotal 20 36 8 6 70 $2,982 00 $9,244
1 2 Environmental Documentation
WSDOT Coordmat�on and APE 8 2 10 $456 00 $1,414
ESA No effect letter 4 24 2 1 31 $1,119 00 $3,469
ECS Fortn 4 8 1 13 $503 00 $1,559
SEPA Checklist 8 24 2 34 $1,286 00 $3,987
Subtotal 24 56 4 4 88 $3,364 00 $10,428
1 3 Miscellaneous Services
Addi�onal directed services 8 6 6 20 $880 00 $2,728
Subtotal 8 6 6 20 $880 00 $2,728
Labor 5ubtotal at Current Salary Rates 52 42 62 12 10 178 57,226 00 $22,401
In-House Expense
Expenses @ 6�0 of labor $� gqq
TOTAL $23,745
Prepared By Phil Struck
Reviewed By
(Pro�ect Manager)
Gary Maynard
2342237-027
NOLL ROAD IMPROVEMENTS 1 Date Pnnted 1?J6/2010