HomeMy WebLinkAbout4965 Contract Number: 4965
Vendor: JANSEN, INC.
Subject: Wheaton Way /Schley Canyon Slope Repair
Department: Engineering
File Class: LEG 12 -1
Begin Date: 9/10/2010
End Date: 12/31/2010
Review Date: 12/1/2010
Vault Date:
Comments: Change Order #1- 12/10; Notice of Completion 12/10/2010
AFFIDAVIT OF PUBLICATION
Account #42742 AD #267618 (2010813 1)
STATE OF WASHINGTON
COUNTY OF KITSAP
I, Laura Wessels, being first duly sworn on oath, deposes and says That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of
KITSAP SUN, that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an office maintained in the aforesaid
place of publication of said newspaper, that the following is a true text of an advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following date, to wit
And on December 10, 2010 such newspaper was regularly distributed to its subscribers during all of said
period The full amount of the fee charged for the foregoing publication is the sum of $39 86 This amount
has not been paid in full
___J YJJ'44 0 1 0
(Signature of Principal Clerk)
Subscribed and sworn to before me this day of December 30, 2010
e_�v
Notary Public in and for the State of Washington, Kitsap C my
NOTICE OF COMPLETION TF 11OF
Notice of Completion has been issued to Jansen, Inc, Protect No 10257 for the Wheaton Way /Schley
Canyon Slope Repair Any parties having a claim for material, labor or damages related to this Contract
have forty -five (45) days from the date of first publication of this notice to file a claim
Carol Etgen
City Clerk
345 6th Street, Suite 600
Bremerton, WA 98337
December 10, 2010 Ad #20108131
Contract Number: 4965
Vendor: JANSEN, INC.
Subject: Wheaton Way /Schley Canyon Slope Repair
Department: Engineering
File Class: LEG 12 -1
Begin Date: 9/10/2010
End Date: 12/31/2010
Review Date: 12/1/2010
Vault Date: 1/1/2012
Comments: Change Order #1- 12/10; Notice of Completion 12/2010
ACCEPTANCE OF COMPENSATION & RELEASE OF ALL CLAIMS
Wheaton Way /Schley Canyon Slope Repair
Contract No. TA 3704
Jansen Inc. hereby indicates agreement with, and acceptance of, the final Progress
Payment of $18,137.72, the total Contract Price of $230,721.50 including Washington
State sales and/or use taxes, and the final Contract Time of 20 worldng days, as full and
final compensation for all Work performed in connection with Contract No. TA 3704,
and does hereby release the City of Bremerton from all claims, liens, liability, demands,
damages and actions of any kind whatsoever, arising from performance of the Contract.
Jansen Inc.
By: '� Date: D
Title, V i cr- pre - do' &-(
Certificate of Notary
Subscribed and sworn to before me this c�� slay of b t' , �v l
/(,( 6, d0
NOTARY PUBLIC
STATE OF WASHINGTON
HEATHER M. RADKE
nay Appointment Expires JUN 2, 2014
Washington State
D p it nxnc of Department of Revenue
eevenue W Box 47474
Olympia, WA 98504 -7474
600 039 614
Certificate of Payment of State Excise
Taxes by Public Works Contractor
JANSEN INC CITY OF BREMERTON
2110 BUCHANAN LOOP STE 1 EDUARDO ABAN
FERNDALE WA 98248 9801 3027 OLYMPUS DR
BREMERTON WA 98310
We hereby certify that taxes, increases and penalties due or to become due from the above -named
contractor under Chapter 180, Laws of 1935, as amended, with respect to the following public works
contract
CITY OF BREMERTON
TA 3704, WHEATON WAY / SCHLEY CANYON SLOPE REPAIR
together with all other taxes, increases and penalties due from such contractor, have been paid in full or that
they are, in the Department's opinion, readily collectible without recourse to the state's lien on the retained
percentage
This certificate is issued pursuant to the provision of Chapter 60 28 Revised Code of Washington for the
sole purpose of informing the state, county, or municipal officer charged with the duty of disbursing or
authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases
the state's lien on the retained percentage provided by this Chapter for excise taxes due from said contractor
This certificate does not release said contractor from liability for additional tax that may be later
determined to be due with respect to the above - mentioned contract or other activities
Dated O 1126 f ( at Olympia, Washington,
State of Washington
Departm f Revenue
Ceriifymg Officer
For tax assistance, visit dor wa gov or call 1- 800- 647 -7706 To inquire about the availability of this document in an alternate format for the visually impaired ,
please call (360) 705 -6715 Teletype (TTY) users may call 1- 800 - 451 -7985 i
REV 310028 (10- 01 -02)
sTerF O�
o �
eY
18 BB
STATE OF WASHINGTON
DEPARTMENT OF LABOR AND INDUSTRS
CITY OF BREMERTON rEB3 7 2 ] ATTN: EDUARDO ABAN PE 3027 OLYMPUS DRIVE ►0 ERIN.Cw1�
BREMERTON WA 98310
Certificate of Release of the State's Lien on Public Works Contracts
With this letter, the Washington State Department of Labor & Industries
approves of your release or payment of the contract amount retained
from the following contractor - --
JANSEN INC 282,491 -00 600 039 614
2110 BUCHANAN LOOP
FERNDALE WA 98248 -9801
- -- related to the following public works contract:
WHEATON WAY SCHLEY CANYON SLOPE REPAIR
TA 3704
This approval is for workers' compensation insurance premiums only.
L &I's prevailing wage section separately requires all contractors on the
Project file an affidavit of wages paid. These affidavits must be
approved before retainage can be released.
In our opinion, all workers' compensation insurance premiums, increases,
and penalties due to L &I from this contractor have been paid in full or
are readily collectible without recourse to the state's lien on the
retained percentage. **
This letter's sole purpose is to communicate our release of the state's
lien to the public official responsible for paying or authorizing the
payment of public funds to the contractor named above.
If we later determine that the contractor owes additional premiums
related to the above - mentioned contract or other activities, the
contractor is still liable for payment.
Dated February 14, 2011 at Olympia, Washington.
ae#%,
Co t c el ase pecialist
PATRICIA MCLAIN
360 - 902 -5385 or MCLP235@LNI.WA.GOV
** Title 51 RCW authorizes L &I to collect workers' compensation
insurance premiums, increases, and penalties.
Chapter 60.28 RCW establishes L &I's priority regarding this lien.
Chapter 39.12 RCW addresses L &I's requirement for affidavits of
wages paid.
.l ANNE
, Employment Security Department
WASHINGTON STATE
CONTRACTOR JANSEN INC ) CERTIFICATE OF
2110 BUCHANAN LOOP STE 1 ) PAYMENT OF CONTRIBUTIONS
FERNDALE, WA 98248 ) PENALTIES AND INTEREST ON
PUBLIC WORKS CONTRACT
ES Reference No 33806000 2
TO CITY OF BREMERTON
3027 OLYMPUS DR
BREMERTON, WA 98310 p 4
The Employment Security Department hereby certifies those contributions, penalties and interest
due from the above named contractor under the Employment Security Act have been paid in full or
provided for with respect to the following public works contract
TA 3704
The Employment Security Department hereby certifies that it has no claim pursuant to RCW
50 24 130 against the public body named above for tax attributable to service performed for said public
body by the above named contractor on the above described contract The Employment Security
Department releases its lien on the retained percentage, which is provided by RCW 60 28 040 for
contributions, penalties and interest due from said contractor
This certificate does not release said contractor from liability for additional contributions,
penalties and interest which may be later determined to be due with respect to the above mentioned
contract
Dated at Olympia, Washington on February 4, 2011
CO MISSIONER
EMPLO M ECURITY DEPA MENT
By
uthorized Represe tative)
Original— Disbursing Officer
Duplicate — Employer
Triplicate -- Central Office Files
EMS 8449 760 R3 -98
. r
AFFIDAVIT OF PUBLICATION
Account #42742 AD #267618 (2010813 1)
STATE OF WASHINGTON
COUNTY OF KITSAP
I, Laura Wessels, being first duly sworn on oath, deposes and says That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of
KITSAP SUN, that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an office maintained in the aforesaid
place of publication of said newspaper, that the following is a true text of an advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following date, to wit
And on December 10, 2010 such newspaper was regularly distributed to its subscribers during all of said
period The full amount of the fee charged for the foregoing publication is the sum of $39 86 This amount
has not been paid in full
(Signature of Principal Clerk)
Subscribed and sworn to before me this day of December 30, 2010
MO FF /T�''��.
.h '
c ��� • ;'y am .
Notary Public in and for the State of Washington, Kitsap Co my CC*
NOTICE OF COMPLETION 0f:;�1P�•°
Notice of Completion has been issued to Jansen, Inc, Project No 10257 for the Wheaton Way /Schley
Canyon Slope Repair Any parties having a claim for material, labor or damages related to this Contract
have forty -five (45) days from the date of first publication of this notice to file a claim
Carol Etgen
City Clerk
345 6th Street, Suite 600
Bremerton, WA 98337
December 10, 2010 Ad #20108131
i
I
I -
I
I
i
i
Contract Number: 4965
Vendor: JANSEN, INC.
Subject: Wheaton Way/Schley Canyon Slope Repair
Department: Engineering
File Class: LEG 12-1
Begin Date: 9/10/2010
End Date: 12/31/2010
Review Date: 12/1/2010
Vault Date:
Comments: Change Order #1-12/10
MEMORANDUM
ENGINEERING DIVISION
TO: Mayor Patty Lent �
FROM: Eduardo Aban
DATE: December 2, 2010
SUBJ: Wheaton Way/Schley Canyon Slope Repair
Change Order 1
Please see attached Change Order 1 for the Schley Canyon Slope Repair at Wheaton Way. The
total increase is $6,087.31, which is 2.71 percent of the Contract amount. This increase was
significantly influenced by the changes in the pavement removal and repaving. These changes
were necessary because the pavement condition was worse when the removal was implemented
in preparation for the repaving. More areas of cracking had developed in the pavement, and it �
became necessary to replace the pavement in these areas. Please see attached drawing
Because of the increase in the quantity of asphalt by more 25 %, I negotiated the original contract
price of $347/ton down to $283.81/ton. This reduction in price is about 18.21%. ,
The revised Contract amount of $230,721.53 shown on the Change Order form is well below the
total budget of $655,000.00. This is funded by FHWA, and the City's share for this additional
cost is 13.5 percent of $6,08'7.31 which amounts to $821.79.
Please let me know if you need additional information or further explanation to this change
order. '
�
CITY OF BREMERTON
CHANGE ORDER
CONTRACT CHANGE ORDER NO: 1
PROJECT NAME: Wheaton Way/Schley Canyon Slope Repair
PROJECT NO: 10257 CONTRACTOR: Jansen, Inc.
ORIGINAL CONTRACT AMOUNT: $224,634.22 DAYS: 20
PREVIOUSLY APPROVED CHANGES: $0.00 DAYS:
THIS CHANGE: $6,087.31 DAYS:
REVISED CONTRACT AMOUNT: $230,721.53 DAYS:
This Change Order covers changes to the subject contract as described herein. The Contractor shail construct, furnish
equipment and materials, and perform all work as necessary or required to compiete the Change Order Items. The
increase or decrease in contract price shown below includes any applicable taxes.
DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT
' CONTRACT CONTRACT TIME
� � AMOUNT AMOUNT EXTENSION
� �
°' °—' ($) ($) (DAYS)
> >
� �
X 1. Increase in Quantities
Description
These are Contract bid items where the estimated quantities
increased, as follows:
1.1 Sawcutting
The increase in quantity for this item was due to more broken
asphalt pavement than estimated at the time of plan
preparation that needed to be removed and replaced. The
increase in quantity is from SO linear feet to 126 linear feet. -
The additional cost is 761inear feet at $11.50/LF. $874.00
1.2 Remove Asphalt Concrete Pavement
The increase in quantity is due to more broken asphalt
pavement than estimated at the time of plan preparation
within the shoulder area during construction. The increase in
quantity is from 34 square yards to 94 square yards. The
additional cost is 60 square yards at $42.25/SY. $2,535.00
1.3 HMA CL yz Inch, PG 64-22
The increase in quantity is due to the replacement of more
broken asphalt pavement than estimated at the time of plan
preparation within the shoulder area during construction. The
increase in quantity is from 25 tons to 80.26 tons. The
additional cost is 55.26 tons at $283.81/TON. $15,68337
1.4 Crushed Surfacing Base Course
The increase on this item is not significant since this was only
used on the area of the slide. The increase in quantity is from
30 tons to 33.14 tons. T'he additional cost is 3.14 tons at
$73.05/TON. $229.38
1.5 Paint Line
The increase in quantity is due to the repainting of the
existing pavement lines that were already faded and do not
meet MUTCD uidelines. T'he increase in uanti is from
CONTRACT CHANGE ORDER NO: �
PROJECT NAME: Wheaton Way/Schley Canyon Slope Repair
1501inear feet to 6731inear feet. The additional cost is 523
linear feet at $1.50/LF. $784.50
X 2. Decrease in Quantities
Description
These are Contract bid items where the estimated quantities
decreased, as follows:
2.1 Structure Ezcavation Class A Including Haul
T'he decrease in quantity is from 409 cubic yards to 300 cubic
yards. The decrease in cost is 109 cubic yards at $28.90/CY. ($3,150.10)
2.2 Raised Pavement Marker Type 1
This item was not installed. T'he decrease in cost is 0.58 per
hundred at $1,016.15/HLJND. ($589.37)
2.3 Corrugated HDPE Culvert Pipe, 3�Inch Diameter
The decrease in quantity is from 301inear feet to 201inear
feet. The decrease in cost is lO lineaz feet @$177.50/LF. ($1,775.00) ,
2.4 Quarry Spalls
The decrease in quantity is from 1,800 tons to 1,718.99 tons.
The decrease in cost is 81.01 tons at $24.90/TON. ($2,017.15)
2.5 Gnbion Cribbing
The decrease in quantity is from 239 cubic yards to 211 cubic
yards. The decrease in cost is 28 cubic yards at $$211.10/CY. ($5,910.80)
2.6 Construction Geoteztile
The decrease in quantity is from 61 square yards to 53.27
square yards. The decrease in cost is 7.73 square yards at
$26.75/SY. ($206.78)
2.7 Eztruded Curb
The decrease in quanrity is from 1501ineaz feet to 1381inear
feet. The decrease in cost is 121inear feet at $8.90/LF ($106.80)
2.8 Raised Pavement Marker Type 2.
The decrease in quantity is from 18 per hundred to 10 per
hundred. The decrease in cost is 8/100 at $$3,274.30/HUND. ($261.94)
2.9 Minor Changes
No work accounted as minor change. T'he decrease in cost is
$1.00. ($1.00)
NET CHANGE IN CONTRACT AMOUNT , $20,106.25 ($14,018.94)
INCREASE OR (DECREASE)
Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or
nature arising from or connected with any work either covered or affected by this Change Order, including, without
limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in �this Change Order
shall limit the City's right to bring a claim for past perFormance.
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price
specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in
work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order.
Page 2 of 3
CONTRACT CHANGE ORDER NO: 1
PROJECT NAME: Wheaton Way/Schley Canyon Slope Repair
This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this
Change Order shall be effective when approved by the City of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on
the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall
take appropriate action to modify any bonds required under the contract to address this change.
RECOMMENDED: �%`G3� C�i�--�' !///�/fi�
PROJECT ENGINEER Date
RECOMMENDED: ��i�?-�" `— ' �
CITY ENGIN R/ DIRECTOR OF PUBLIC WORKS Date
ACCEPTED:
�1 3� )�
CONTRAC R � Date
APPROVED: lZ `' Z `� v
MAYOR Date
APPROVED AS TO FORM: ATTEST:
��/� �
Bremerton City Attorney ity Clerk
Page 3 of 3 .
Contract Number: 4965 ,
Vendor:
Subject:
Department:
File Class:
Begin Date:
End Date:
Review Date:
Vault Date:
Jansen, Inc.
Wheaton Way/Schley Canyon Slope Repair
Engineering
LEG 12-1
9/10/2010
12/31/2010
12/1/2010
Comments:
�
�
�
�
�
co�rr�c�
CITY OF BRENNIEERTON, KITSAP COUNTY, WASHINGTON
THIS AGREEMENT, made and entered into this j��i.. day of SP.��'• , 20 t D,
between the City of Bremerton under and by virtue of Title 35 RCW (cities) as amended, and
,Tanseo, Inc.
hereinafter called the Contractor.
WITNESSETH:
That in consideration of the terms and conditions contained herein and attached and made
a part of this ageement, the parties hereto covenant and agree as follows:
I. The Contractor shall do all work and furnish all tools materials and e ui ment for the
� q P ,
Wheaton Way/Schley Canyon Slope Repair, in accordance with and as described in the
attached Plans and Specifications, and the 2010 Standard Specifications of the Washington State
Deparhnent of Transportation which are by this reference incorporated herein and made part
hereof and shall perform any changes in the work in accord with the Contract Documents.
The Contractor shall provide and bear the expense of all equipment, work, and labor, of any sort
whatsoever that may be required for the transfer of materials and for constructing and completing
the work provided for in these Contract Documents except those items mentioned therein to be
furnished by the City of Bremerton.
� II. The City of Bremerton hereby contracts with Contractor and Contractor hereby agrees
� to provide the materials and to do and cause to be done the above described work and to complete
and finish the same in accord with the attached Plans and Specifications and the terms and
conditions herein contained and hereby Contracts to pay for the same according to the attached
specifications and the schedule of unit or itemized prices at the time and in the manner and upon
the conditions provided for in this Contract.
���`�
�
��
III. The Contractor is and shall be at all times acting as an independent contractor and
not as an employee of the City. The Contractor shall secure at its expense, and shall be
responsible for all payments of income tax, social security, state industrial insurance
compensation, unemployment compensation, and all other payroll deductions for the Contractor,
officer, agents, employees and sub-contractors. The Contractor shall also secure all applicable
business licenses, if required, in connection with the contract services, including all required
licenses for Contractor's officers, agents, employees and subcontractors.
IV. The Contractor for himself/herself, and for his/her heirs, executors, administrators,
successors, assigns, does hereby agree to the full performance of all the covenants herein
contained upon the part of the Contractor.
� V. It is further provided that no liability shall attach to the City of Bremerton by reason
of entering into this Contract, except as provided herein.
� City ofBremerton
Wheaton Way/Schley Carryon Slope Repair
LD-13
June 2010
,
�`
�'
G
�.
�
�
� 1
t+
�
r
e
!�
r
�
,
�.
�
�
L!
�.
� :�
�;
!Q 1
��
VI. INDEMNg'ICATION. Contractor shall defend, indemnify and hold the City, its
officers, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits including all lega.l cost and attorney fees, azising out of or in connection
with the performance of this agreement, except for injuries and damages solely caused by the
City's negligence. •
The City's inspection or acceptance of any of Contractor's work when completed shall not be
grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, then, in the event of liability for damages azising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor
and the City, its officials, employees, agents and volunteers, the Contractor's liability
hereunder shall be only to the extent of the Contractor's negligence.
IT TS FUR'THER SPECIFICALLY AND EXPRESSLY LTNDERSTOOD THAT THIS
INDEMNIFICATION CONSITUTES THE CONTRACTOR'S WAIVER OF TNIlViUNITY
UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF
THIS INDEMNIFICATION. TI-� PAR'TIES ACKNOWLEDGE THAT THEY HAVE
MUTUALLY NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration of termination of this agreement.
IN WITNESS WE�REOF, the Contractor has executed this instrument, on the day and year fust
below written and the Loca1 Agency Approving Authority has caused this instrument to be executed
by and in the name of said City of Bremerton the day and year first above written.
Y'h
Executed by the Contractor this � day of � � 20 ��
-�—
�am��n 1�n� V. P.
Contractor
Executed by the Local Agency this _� day of ���►�'l �� 20�.
(SEAL)
City of Bremerton
Wheaton Way/Schley Carryon Slope Repair
�
� O!�
City of emerton Approving Authority
C �
City of Bremerton Attorney
LD-14
June 2010
�
Bond No. 20-SUR-208465
t ,l (: `, .�� ' `.';
�HA J[ �� �A'!L' L�l�'J18H lll`C� RAA A{7�A �YJ� 9��IJ1d3J.11171 Vl'Y
KNOW AI.I, MFN AY 'I'HESE PRTSENTS:
't'hat Jansen, Inc . , af Ferndale, Wa� . i n.g..t9sL_, as
PI'lt]Clj)c��, all(� American Safetv Casualtv =m�urance com�any�: as Snrety, are�ou�tly and sevcral(y hcld
and bound unto TI�IT: CT1'Y OF BREI�lEItTON, the pennl stun of Two Hundred *1�ollars
($2 24 . 6 3 4..2,�? , for the paymcnt ofwhich we jointly a��d severaliy bind ourselves, or heirs, execirtors,
administrators, and assigns, and successors and assigns, finnly by tliesc presents.
*Twenty Thousand Six Hundred Thirty and 22/100
The condition of this bond is such that 17VHEREAS, on the 2 nd ^__ day of
Sepr,,.�,.IIikzer , A.D., 2010 , tiie said Jansen, Inc .__ __ , F'rincipal herein,
exec��ted a certain Contract with the City ofBreinerton, by the terrns, eonditions and provisions ofwhieh
Coutract the said Jans en , Inc . ,1'rincipal herewitli, agrees to fumish all m�terials a�id do
certain wot�k, to-wit: That the said Principal herein wi11 undertake and complete the following described
work:Wheaton Way/Schley Can�on Slo e Re��ir
the Couuty of ICitsap, Washington, as per inaps, plans and specifications Tnade a pu�t of said Contract,
which Contract as so executed is hereutitu attached, and is now refe�red to and by this refercnce is
incorparated l�erein and rnade a}�art hereof as fiili for all purposes as if here set forth at length.
NOW THER.�:1�OI2E, if the Principal herein shall faithfiiliy �nd tnrly observe and couaply �vith the
tenns, conclitions aud �}rovisions of said Contract, u� alI respccts t�nd shall well and tnily and fully do and
perfonn all matters and things by thc said 1'rincipai iurdertalcen tu be performed uncler said Cnntract, upon
the terms proposed therei�a, and within the time prescribed therein, and until the same is accepted, a�id shall
pay ali laborers, mechanics, subc.antractnrs and materialmen, a�id all persons who shatt s��pply such
Contr�cior or sirbcontractor with provisions and supplies for the carrying on of sueh wark, and shal( in all
respeets faithfully �erfnrm said Convact accoidir�g to law, then this obligation ta bc vaid, otherwise to
remtin in full force ancl effect,
WITNESSaurhandsthis 9th __dayofSegtem er ,201Q.
Principal
Jansen Inc .
St�rety Cotn�any American Safety Casualty Insurance Company
By: F3y: ,
� `- ��� ,
�ri pz har Ki n�n �
Attarney-in-fnct
APPROV�D 11S TO FORM this
Address of local office and agent of �urety Company:
Propel Insurance
1201 Pacific Ave, Ste 1000
Tacoma, WA 98402
day af , 20
`�
City af emerton Attorney
City af Bt�enterton
Wheaton WaylSchley Carryora Slope Repczir LD-I S
June 2010
�
�
�
nMrR�urs�rt�ru�s,u��
POWER OF ATTORNEY
20-SUR-208465
KNOW ALL MEN $X'f[�SE PRESEN'CS, that American Safety Caswnity [nsunnce Comparty has madc, constiwted and appointed, and by these preseats �es make,
---------- -_ -.-� —_ - - _ - -- - °-- - - - - - - -- - - - -
-_ ;_- - �= -��-_ _=�= °`� - hr' ��t = h -_ =in. =ori- == == == ==�= ===-.� -_
=.- _-_ -. = -.� =_ =,-= _ =- = �=:= C is op er _y === === = � . - __ =__-==== ==
� = =:= --_- _ =-= °= _�__= =:__° _:____ === =_= �::= -==___ =�== _ _-___ = =:�a==� ==
- iu we and-�wfut attomey-in=fact; for it and �ts name, place; and stead:ta°execute on behal_f_of the-said Company as surety,_bon�,ynderla g and contract
to be given to '
�
�
� =_
�
�
�
�
�
ALL OBLIGBES,
provided that no bond or undertaking or contract of suretys6ip executed under this authority shal! exceed 'm amount the sum of
Two HundreA Twenty Fow Thousand S�x Hundred Thirty Four pollars and Twenty Two Cents ($224,634 20)
This Power of Attorney-_is granted aad is signed and seated by_facsimile under.and by the authority of the-foliowing Resolution adopted by the Board of Bir�tors of the Company.
'on the Eigtett[ day of Septcmber; 2003, -- _ - _ - _ ` - = = -- =_ = _ - = - - ` - _ ` '
= _-- _ _ � _- - _-` °_' `_ °�_ °° i `�iSecre -ma a intattocne -in=factoc"a ents-witha"u{hori :as"definedorlirsut d' -
or n: stan ta e te the
in with Secr
a Ass
RFSOLVED,=that.the,Presid�t._conjnnction the etacy : ,Y =- _ _�Y_ FP� _YS -8_ _--- �Y
inswmeat evidencing the appointment in each case, for aad�on behaCf"of the Company; to execuie`and deliver and affz"tt►e seal the Compaey to bonds, undertakings,
recognizances, and suretyship obligadons of all kinds; and said officers may remove any such attozney-in-fact or agent and revoke any power of attomey previously granted to
such persons.
RESOLVED FURTSER. that any bond, undertaking, recognizaace, or suretyship ob[igaaon shall be valid and bindieg upoa the Company:
(i) wben signed by the Psesident aa� any Vice-President and attested and sealed (if a seal be require� by any Secretary or Assistant Secretary or (ii) when signed by Ihe President
or any Vice-Pmsident or Secretary or Assistant Secretary, and conntersigned and sealed (if a seal be required) by a duly suthorized attorney-in•fact or agent; or (iii) when duly
executed and seated (if a seal be require� by one or rttore attorney-in-fact or agents pursuant to and within the limits of the authority evidenced by the power of attaney issued
by the Company to such person or persons. -- - ___ _ __'- __ " _=_ °_ `_= .=` _ _ _ _ _ _ . ___ ______ _ " ____ ° _ = _=_ _' ___ _°_
YiFSpI,VgD_FZJRT$E$ that the signature of any authonzed officer and:the sea! of the Company roay be affixed by facsimik to any powtr of at[orney:ar certificaUOn theieof
authoriziag the e�ceeuti� and deLvery of any bond, undertalung_ recogwzance, oi other suretyship obiigauons of ihe Compaay;_ and such signature_and seal when so used shall
fiave the sairie foree and"affects as though manually°affixed.- - -=_ = _ " - _= _- _ __ = - _ — _= -, = _ �=
IN WITIVESS I�PSEREOF, American Safety Casnalry Insurance Company has caused its official seal to be hereunto affixed, and these presents to be signed by its President and
attested by its Secretazy this Eighth day of September, 2003.
Attest:
STATE
Randolph L Hutto, Secretary
.��5�� � � V�•
Stephen R. Crim, President
_ =- �= -� _ _ `=-= °-�>'' _==- _._ =_= _=.- .-- _ . -._ = _-
-- -- - - - -- - o - _- - _ - -- - -
°==`_ =___ =--_� - = •�..� __= =_ _ __ -° _== = _ =_== _�= `�_ ==
_—_ ___. _______ _ ___ _ _ __ r _ __ __ _ __ _ - �. __ _-_ _ _ -___" ___
80:—_ ____ _ =_- c= "."=_:a �_ �-- =_:�___ _____: _"__' c—' �'-�=.3 = _ __" :`_`_' °-'-z
� On this Eighth day of September, 2003, before me personally came Stephen R. Crim, to me known, who, being by me duly swom, did depose and say that he is the President of
American Safety Casualty tosurance Company, the corporation described in and which executed the above instrument that he knows the seal of the said capora6on; that the seal
afftxed w ttte said instrument is such corposate seal; that it was so affixed by order of the Boazd of Directors of said corpomtion and that he signed his name thereto by like order.
�
�
�
�
I; the::yndeisigned,_ Secietary =of-American :
Pawer of Attcifney remaens in fiitl"force and tias
in fosce.
Signed and Sealed at the City of Atlaata, in the Ctate of Georgia.
__ -�- _ ° _ _ _�-
� I — _ __°_ —� _—=
- _"-- ___ --.
: c ;4�MOlA�� �`; y ; �
_ ° MuG 'r ; ��MiW�
" s '� ��yp `� ;_ _ Ruth . Bankston, Notary Public
=_' .�---=- _- =: __ .->-== -._ _ _ ° "_
-:=_:6 '91r.uuntM�ac==� _ :z=�= ==s� _'_'-- �-- __- .�:= '_ `— =_==`z ._: '- e=_.
oee Company an -0klahoma-'COt[J018t10R; DO=HEREBY_CERT7FY-thac=the=foFegoing'and a
fiiritierm� that the°Resolution-of-the Board of_Directois, set forth iu=the satd-Power of_Attotoey,
NUMBER
Dated the !t� day of -fG'� �El•� j'fj , Z� "T �
_===_°Ran _ h L. Huiro, Seotetary == - - = _ " _=: = _: -
CIRIC;I:V�LL.SOFTIil.SYOii�EROF.-{TTORA'FF.4REYftIiVTEI) fl%ITHREU:\'L:IIERICALs�Z%:11BERC.
' UC'PLIC:l7'E.4SH.ILLH91�'7'HE'S:d:tiIEF'UKCE:IJ'U�Y�1�GC1'_-iS.�t.�"OKIGI.V.-tLO:\`L}'ttTiE:\`ISSt:"L'DINCUA'JL'�\'C%7C3:\7li-'1%'r�THEOKYCi,��II_