4950
HDR ENGINEERING INC
Document Design - Gorst Pump Station Design
Engineering
LEG 12-1
8/18/2010
10/31/2010
12/1/2012
Comments :
,
� k�
li
�'i
�;I
�--_--- --- — ��I
.. , � I I
PUBLIC WORKS 8 UTIL/TIES
Engineering Division
August ?, 2010
Brian Bartle, P.E.
�IDR Engineering Inc.,
500 108`" Avenue NE, Suite 1200
Bellevue, WA 98004
Subject: Gorst Sewerage - Letter Contract to Document Design
Dear Brian:
ra�c.arra.ax�o
� Fa�r 98G.473.53�8
� 5027 Olympus Drive
, BremertoA, WA 88310
This letter contract is for development of a technical memorandum to document the Gorst Pump
Station design as outlined in the attached scope of services dated July 29, 2010. T'he work will
be paid on an hourly basis, in accordauce with the attach�d fee schedule; the cost of this wark is
not to exceed $16,151.
If HDR Engineerin� Inc. abrees to the above terms, please indicate acceptance by signing below
where indicated. If you have any questions or concerns, please contact either myself at (3b0)
473-5288, or Tom Knuckey at (360) 473-2376.
Sincerely,
i '' ' � �f ,/� � _
��� •� � ��.r--__ -
Mike Mecham, P.E.
City Engineer
mn�/tk/aw
enc.
0810-02
�
, /•r..
'T�RMS q�w ���rnous � rN�s RGnE€�uE� sNqcc. 8E �u
qcc,oRa�t� wr� � "uv TREpr�uE�cn fqc�crry ��6u
A,c� co,c�rau�no�u sEQV�s�� A�a�,uE� aA�v su� z, z�.
HDR ab�r�es to the above terms:
I-IDR En;ineernig Inc.
�C��fo
,
�
�, ��� . �., �, ,
j - �' j. '- ;�� , •.
Scope of Services
�
July 29 2010
, 500108th Avenue NE
Suite 1200
Bellevue, WA 98004-5549
� (425) 450-6200
��
Table of Contents
Background...................................................................................................................
Task 100 — Project Management ..................................................................................1
Obj e ctive ...........................................:................................................................. 1
HDRServices ..................................................................................................... 1
ClientResponsibilities ......................................................................................... 1
Assumptions....................................................................................................... 1
Deliverables........................................................................................................ 2
Task 200 — Design Memorandum ................................................................................ 2
Objective ................. ... ............. . ........ ... .. ... .. ... .... ..... .... .. . .... ........ ........ ..... ........ .... 2
HDRServices ..................................................................................................... 2
ClientResponsibilities ......................................................................................... 2
Assumptions..........................................................:...........:.............................-... 2
Deliverables........................................................................................................ 3
<Title> i Scope of SeNices
. ��
�x���'� �
. - _ . :-
�ackgrou�d
HDR has previously completed the design of the Gorst UGA Sewerage Project Pump Station
S83 and SB4 project, which is nearly complete through construction. With the startup services
beginning, the City has asked that HDR complete a design technical memorandum summarizing
the assumptions made throughout design regarding the current and future operation of the
pump station system.
Task 100 — P'roject �Aanagernent
Objective
The purpose of this task is to monitor, control and adjust of scope, schedule, and budget as well
as provide monthly status reporting, accounting, and invoicing.
HDR Services
1. Prepare a Project Management Plan (Project Guide) outlining the project scope, team
organization, schedule, and communications information. �
2. Coordinate and manage the project team.
3. Prepare monthly status reports describing with the following:
A. Services completed during the month
B. Services planned for the next month
C. Needs for additional information
D. Scope/schedule/budget issues
E. Schedule update and financial status summary
4. Prepare monthly invoices formatted in accordance with contract terms.
5. Project Manager will coordinate over the phone with City Project Manager regarding the
project scope, schedule, and budget.
Client Responsibilities
1. Attend project management meeting.
2. Timely processing and payment of invoices.
3. Review and process contract change requests and amendments, if needed.
Assumptians
1. The project duration will be 1 month.
2. Project management meeting will be canducted via telephone. No project meetings will be
conducted in Bremerton.
<Title> 1 Scope of Services
��
3. Invoices wiii be HDR standard invoice format.
4. Expense backup will not be provided with invaices but will be available for review at HDR.
Deliverables
1. Scope of services and budget (PDF file and two copies).
2. Project Management Plan (Project Guide) (PDF file).
3. Monthly report and invoice (one copy with invoice can be mailed or e-mailed PDF file).
Task 200 — Design Nlemoranelum
9bjective
Prepare a design memorandum for the Gorst Pump Stations SB3 and SB4. This subtask will
explain the design criteria used and define the various piping and pumping operational
configurations assumed during design.
HDR Services
i. Document the design criteria used for the project.
2. Prepare draft design report, including figures,
3. Prepare final design report, incorporating City review comments.
4. Provide internal review and quality control of the design report.
Client Responsibilities
1. Return commenfs on the draft design report.
Assumptions
1. The following is the preliminary Table of Coritents for the design report:
A. Title Page
B. Introduction
i. Background
ii. Objectives
C. Design Flows
i. Initial Condition
ii. Full Build Out Condition
D. Operating Conditions
i. Initial Condition
1) SB1, SB3, and SB4 Flow Scenarios
2) Pipeline Scenarios
3) Surge Conditions
ii. Full Build Out Condition
1) SB1, S63, and S64 Flow Scenarios
2) Pipeline Scenarios
<Title> 2 Scope of Services
�.\
3) Surge Conditions
E. Appendices
i. Parametrix Surge Modeling Results
ii. Select design drawings (no new drawings)
F. Figures �
i. Vicinity Map
ii. Valving Configuration(s)
Deliverables
1. Draft design report (one PDF electronic copy).
2. Final design report (Five hardcopies, one PDF electronic copy).
<Tit12> 3 Scope of Services
H�R
Gorst Design Niemorandum, City of Bremerton, WA
HDR Engineering
Task No. Task�: Description Labor � Expenses Total .
�
, _ . . _ � .. _, �.. ..�.� , . . ..._ .�y�_... . . , __. _�.�
1.0 Project Management �$ 1,630 :$ 170 $ 1,800
� --
- --- -- -- -- - -- - --�—
2.0 Design Memorandum '$ 13,720 $ 630 I$ 14,350
Subtotal $ 15,350 $ 801 $ 16,151 '
FN:12010-07-29 - Bremerton Gorst Design Report Budget.xlsxlHDR Summary Printed: 7/29/2d10 3:36 PM
f:IT:�
fK 12p1p-07d8- 9renenon Gnsl Dsgn Rey�r, dudgecdsc4+DR B�O�ng Hw. Page 1 of 1 Pnnted' IIil2U10 33e RN
Gor3t Design Memnrendum, City of Bremerton, WA
HDR
Gorst Design Memorandum, City of Bremerton, WA
HDR Engineering
Project Management
Direct Expenses
PrintinglCopying $ 101
MaiVDeliveries/etc. 1 $25 $ 25
Mileage Mi. @ $0.55 /Mile $ -
Auto Rental/Gasoline days @ $65 Iday $ -
Lodging days @ $200 /day $ -
Aerial Photographs $20 $ -
Travel Total (^��^��,�-'�� ferry, etc) $35 $ -
Communica6on & Computer Charge 12 $3.70 mour $ 44
Laboratory $ -
Parking days @ $20 /day $ -
Meals days @ $35 fday $ -
Subcontracts $ -
Sub #1-
Sub #2 -
ODCs $ 170
Mark•up on Subs 5% $ -
Subtotal $ 170
Design,Memorandum
Direct Expenses
Prir�tinglCopying - $ 253
MaiUDeliveriesletc. $25 � $ -
Mileage Mi. @ $0.55 IMile $ � -
Auto Rental/Gasoline days @ $65 lday $ -
Lodging days @ $200 Iday $ -
Aerial Photographs $20 $ -
Travel Total (°��°��, °,�-'��; ferry, etc) $35 $ -
Communication 8 Computer Charge 102 $4 lhour $ 377
Laboratory $0 $ -
Parking days @ $20 /day ' $ -
Meals days @ $35 lday $ -
SuDcontracts $ -
Sub #1 - $ -
Sub #2 - $
ODCs $ 630
Mark•up on Subs 5% $ -
Subtotal � $ 630
TOTAL EXPENSES $ 801