HomeMy WebLinkAbout4939Contract Number:
Vendor:
Subject:
Department:
File Class:
Begin Date:
End Date:
Review Date:
Vault Date:
4939
HDR ENGINEERING INC
Gorst Sewerage - Document Design
Engineering
LEG 12-1
8/2/2010
10/1/2010
9/1/2010
1/1/2014
Comments :
� :_
i �
. , - - -- —�;
� 3 c� � �
, ° � �a
� , i----� __-- �1
Pveirc woRxs � ur,L��rEs
EngBneering Dlvfslon
I�II�USt �. ZO��
Brian Bartie, P.E.
HDR Engineering I�ic.,
500 108'�' Avenue NE, Suite I2UU
Iiellewe, WA 98004
Subject: Gorst Se�verage - Letter Contract to Document Design
Uear Brian:
1r►38A:47�.47T0. �
i ia_�A7�.dS98. �
.as
iO41 Otympus Wive
BremsKOn; WA 88310
This letter contract is for de�-elopmem of a technical memor�ndum to docwnent the Gnrst Punip
Statioii desi�n as outlined in the attached scope of services dat�d July 29, 2010. 1'I�e �vork will
be paid on ��n hourly basis. in �ecordance �vith the attached fee scliedule; the cost of this �voi•k is
nat to exceed $16,1 � 1.
If HDR Fnsineerin� lnc. agrees tu the abuve terms, please indicate acceptance by signing below
where indicated. If you have any questions or concei7is. ple�se contact eithe�• myself at (360)
473-5288, or "fom Knuckey .�t t360) 473-2376.
Sinccrcly.
/' �/ � �
/� l �,
�� . .//�, , �r . .
Mike Mecham. P.L'•.
City En�ineer
mm/tk/aw
eiic.
08 l 0
(1nR abrecs to the abuve terms:
HDR En�ineerin� Inc.
By: - _ .�
�.. /�
;}r. (��;,�fti ''s'�G=�r_'-cc;.l
� (y�r �
"�6aMs q�w Cou �rnou� of 1NK AGRE�w6M' sNqu. BE !�J
ACGD QD /�� W H�{ 1►fE � G t/ 7REATMEM" FqCt41�j AE3'/6�
AuD Coustau�nau S�QU�" ��Q�,u aAr�a J'u� I, aanq.
��� /�'
City of Bremerton
Gorst Design Memorandum
Scope of Services
July 29 2010
500108th Avenue NE
Suite 1200
Bellevue, WA 98004-5549
� (425�450-6200
��
Table of Contents
Background...................................................................................................................
Task 100 — ProJect Management .................................................................................. 1
Objective ............................................................................................................. 1
HDRServices ..................................................................................................... 1
Client Responsibilities ......................................................................................... 1
Assumptions....................................................................................................... 1
Deliverables........................................................................................................ 2
Task 200 — Design Memorandum ................................................................................ 2
Objective .............. .................... ... ... ... ..... ........ . ..... ... .... . .. .. ... .. ... .. .. ................ ... .... 2
HDRServices ..................................................................................................... 2
Client Responsibilities ......................................................................................... 2
Assumptions....................................................................................................... 2
Deliverables........................................................................................................ 3
<Title> i Scope of Services
��
ExHaBOT a
SCOPE OF SERVICES
Background
HDR has previously completed the design of the Gorsf UGA Sewerage Project Pump Stafion
SB3 and SB4 project, which is nearly complete through construction. With the startup services
beginning, the City has asked that HDR complete a design technical memorandum summarizing
the assumptivns made throughout design regarding the current and future operation of the
pump station system.
Task 100 — Project Management
Objective
The purpose of this task is to monitor, control and adjust of scope, schedule, and budget as well
as provide monthly status reporting, accounting, and invoicing.
HDR Servtces
t. Prepare a Project Management Plan (Project Guide) outlining the project scope, team
organization, schedule, and communications information.
2. Coordinate and manage the project team.
3. Prepare monthly status reports describing with the following:
A. Services completed during the month
B. Services planned for the next month
C. Needs for additional informaiion
D. Scope/schedule/budget issues
E. Schedule update and financial status summary
4. Prepare monthly invoices formatted in accordance with contract terms,
5. Project Manager will coordinate over the phone with City Project Manager regarding the
project scope, schedule, and budget.
Client Responsibilities
1. Attend project management meeting.
2. Timely processing and payment oi invoices.
3. Review and process contract change requests and amendments, if needed.
Assumptions
1. The project duration will be 1 month.
2. Project management meeting will be conducted via telephone. No project meetings will be
conducted in Bremerton.
<TiUe> t Scope of Sarvices
��
3. Invoices will be HDR standard invoice format.
4. Expense backup will not be provided with invoices but will be available for review at HDR.
Deliverables
1. Scope of services and budget (PDF file and two copies).
2. Project Management Plan (Project Guide) (PDF file).
3. Monthly report and invoice (one copy with invoice can be mailed or e-mailed PDF file).
Task 200 — Design Memorandum
Ob)ective
Prepare a design memorandum for the Gorst Pump Stations SB3 and SB4. This subtask will
explain the design criteria used and define the various piping and pumping operational
configurations assumed during design.
HOR Services
1. Document the design criteria used for the project.
2. Prepare draft design report, including figures.
3. Prepare final design report, incorporating City review comments.
4. Provide internal review and quality control of the design report.
Client Responsibillties
1. Return comments on �the draft design report.
Assumptions
1. The following is the preliminary Table of Contents for the design report:
A. Title Page
B. Introduction
i. Background
ii. Objectives
C. Design Flows
i. Initial Condition
ii. Full Build Out Condition
D. Operating Conditions
i. Initial Condition
t) SB1, S63, and S64 Flow Scenarios
2) Pipeline Scenarios
3) Surge Conditions
ii. Full Build Out Condition
1) S61, S63, and S64 Flow Scenarios
2) Pipeline Scenarios
<Titte> 2 Scope of Services
��
3) Surge Conditions
E. Appendices
i. Parametrix Surge Modeling Results
ii. Select design drawings (no new drawings)
F. Figures
i. Vicinity Map
ii. Valving Configuration(s)
Deliverables
1. Draft design report (one PDF electronic copy).
2. Final design report (Five hardcopies, one POF electronic copy).
<Title> 3 Scope of Services
HDR
Gorst Design Memorandum, City of Bremerton, WA
HDR Engineering
Task:No. �Task Descrlption Lebor Expenses Totai
1.0 Project Management $ 1,630 $ 170 �$ 1,800
2.0 Design Memorandum :$ 13,720 �$ 630 t $ 14,350
Subtotai $ 15,350 ( $ 801 $ 16,151 ;
FN:12010-07-29 - Bremerton Gorst Design Report Budget.xlsxlHDR Summary Printed: 7/2912010 3:36 PM
HDR
Gors1 Dealgn Mcmorandum, City ol B�emerton. WA
in►
Nw
Pr0((�GYmatho�M —
1Aat Rn rM IGotdl Neetnq --.
� - - --- ---- 2
- -- � - -
_ _ ----' � �-
- 1 ---- ...�_ .—'-__ n - -_ � � _..
il 6 _ _ __. _ _ ._____
- - - ------ - - - -- - -- -
- � - - 40 — - - a --- . _ �
t �a - - _- -?
--- -- --
6 —' --
� .-!--- 6- -� � ---- ..._ ID _ . ..� - -
• ` � ne' _ a sa - - _- _ _�_- � --- - . < _..__._ .
_-__. ____`_IO___.. . :t .- � _,_. -�_---
!mR � ►�R.
: � lT)�Oi � t9- 3e-e :�n GYV CNSa^. RK r, d� tiM .L•� �•CN P.t�.7 ��:�, . Paye � tJ 1
,,,,, �.._ �� _�
�
�
1� �f'1�§
��
hr[e1 ]7Rdlu 3SiGtl
HDR
Gorst Design Memorandum, City of Bremerton, WA
NDR Engineering
ProJect Management
Dired Expenses
PrintinglCopying $ 101
MaiUDeliveriesleic. t a25 $ 25
Miteage Mi. (,al $0.55 lMile $ -
Auta RentallGasoline days @ $65 Iday $ -
Lodging days @ $200 Iday � -
Aerial Photographs S20 S -
Travel Total (�iR (erry, etc) 535 S -
Communication & Computer Charge 12 53.70 mour $ 44
Laboratory 5 -
Parking
Meais
Su�ontracts
Sub�t -
Sub #2 -
ODCs
Mark•up on Subs
Subtotal
days @ 520 lday 5 -
days @ $35 lday � -
$ -
S 170
5% 5 •
b 170
Oesign Memorandum
Direct Expenses
Printing/Copying $ 253
Mail/Deliveriesletc. 525 $ -
Mileage RAi. @ 50.55 /Mile � � -
Auto RentallGasoline days @ S65 Iday S -
Lodging days @ $200 /day 5 -
Aerial Photographs S20 5 -
Travel Total (ai�aFe �bair�; ferry, etc) $35 S -
Communica6on & Computer Charge 10? $4 mour $ 377
Laboratory $0 g -
Parking days @ S20 lday $ -
Meals days @ S35 /day $ •
Subcontracts g -
sub�1 • c� .
Sub #2 - $ .
ODCs $ 630
Mark•up on Subs 5% 5 �
Subtotal S 630
TOTAL EXPENSES $ 801
FN��2010-07-29 -&emeRon Gorst Oesign Reoort Budgel.zlsxUiDR Expen�ege t ot t Pnnted 7l29�'2010 3:36 Ph1