Loading...
HomeMy WebLinkAbout4931 1 0 Contract Number 4931 Vendor: EA ENGINEERING, SCIENCE & TECHNOLOGY, INC. Subject: SKIA Sub Area Plan Department. Comm Devel File Class. LEG 12 -1 Begin Date: 7/22/2010 End Date. 12/31/2012 Review Date: 1/1/2011 Vault Date: Comments. End Date Used As Estimate; Amendment #1 3/5/12 N FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT SKIA SUB AREA PLAN The City of Bremerton ( "City ") and EA Engineering, Science & Technology, Inc (Consultant) referred to collectively as the "Parties," enter into this First Amendment to Professional Agreement ( "Agreement ") WHEREAS, the City Council authorized the Professional Services Agreement with Consultant and the contract was adopted with a term beginning date of July 22, 2010, and an estimated term end date of December 31, 2011 The Agreement provides that additional time can be granted by the City for excusable delays or extra work NOW THEREFORE, The parties agree to amend the scope and extend the term of the Agreement as follows I. Section I of the Agreement entitled "Scope" is amended to add the tasks as outlined in Exhibit A of this Agreement, incorporated herein by reference II. Section II of the Agreement entitled "Term" is amended as per Exhibit A of this Amendment, extending the estimated termination date through December, 2012 III. Section III of the Agreement entitled "Compensation" is amended, as authorized pursuant to BMC 2 76 110, to increase compensation for additional services as set forth in Exhibit A as follows In consideration of the services provided pursuant to the Agreement and this Amendment, the City shall pay Consultant an additional amount of $12,000 and the City shall reserve another $8,000 of contingency funds that may be used by the Consultant only upon written authorization by the City, as outlined in Exhibit A of this Amendment The additional fees plus contingency in Exhibit A amend the contract to an amount not to exceed $420,000 00 Consultant's charges and bills shall conform to the fee schedule in the Agreement and Amendment Exhibit A IV. Due to a change in the name of Consultant, the Agreement is amended to change the name of Consultant from `Blumen Consulting Group LLC" to "EA Engineering, Science & Technology, Inc " V. All other terms and conditions of the Agreement shall remain in full force and effect CITY OF BREMERTON EA ENGINEERING, SCHIENCE & TECHNOLOGY, INC (EA/BLUMEN CONSULTING GROUP) By Pa ent By p� Its Ma r Title. Date ,,e�� OS�-' /?� Date ? /Zj2 R \Legal\L egal \Contracts\DCD\BlumenContract - First amendment doc 1 w N EXHIBIT A ,jy r� 6 1 BLUMEIV 720 Sixth St S Suite 100 Kirkland, WA 98033 Ph 425 - 2845401 Fax 425- 2845402 Memo To: Andrea Spencer, City of Bremerton From Deborah Munkberg Doug McIntyre, City of Bremerton Karen Swenson Date: January 20, 2012 Phone: 206 834 3897 Re' SKIA Budget Amendment CC: Per our discussions, this memo includes (1) a request for supplemental budget to complete additional SKIA Subarea Plan tasks and (2) a description of our proposed budget reallocation to cover planned public meetings 1. Supplemental Budget Request. This request for a revised budget which includes funds for additional services to provide graphics and illustrative photographs, revise regulations to incorporate images and to provide contingency funds for additional services resulting from potential subarea plan revisions Please see the table below for a specific description of tasks Table 1. Proposed Supplemental Budget Tasks Fee Task 1: Generate New Graphics and Illustrative Photographs The City requested that additional graphics be provided in the Sustainable Development $8,395 Standards and Design Guidelines AHBL will provide at least 25 photos and five (5) diagrams to illustrate design concepts and definitions Task 2: Integration of Graphics and Document Revisions AHBL will resize and reformat images and document text as necessary to accommodate the $2,905 insertion of these graphics and provide a revised draft of the Sustainable SKIA Subarea Plan Task 3: Major Revisions AHBL will review and prepare revisions, as needed, in response to City comments on the $700 revised regulations submitted to the City in January 2012 Task 4: Contingency Contingency funds have been reserved to address unanticipated costs associated with the upcoming SKIA Subarea Plan public review process Contingency funds may be used to $8,000 support public meetings, document revisions or other related tasks Contingency funds will be held in reserve and accessed by the Consultant only upon written authorization by the City TOTAL $20,000 Exhibit A. EA Blumen Contract Amendment #1 EXHIBITA January 20, 2012 2. Proposed Budget Reallocation. The City has requested consultant facilitation and attendance at a series of eight public meetings, including Technical Working Group, Executive Committee, Planning Commission, and City Council meetings, through August 2012 In reviewing our budget, we believe that the additional labor and deliverables for the public meetings can be achieved by the reallocation of the remaining consultant/subconsultant budgets The table below documents our proposed budget reallocation As this table shows, we expect to be able to staff the planned public meetings through a reallocation of funds from EA I Blumen and Chris Webb & Associates to the remaining firms on the team Upon your approval, we will make these changes, no additional action from the City is required Table 2. Proposed Budget Reallocation Available ! Proposed Public }Firm Bud get (la bor)' Mee Bu dget Difference E AIBlumen _ $ 20,830 $ 12,150 $ 8,680 AH _v $ $ 2,400 H YCO $ _ 3 080 $ (3,080) r _ _ (Po $ 6,500 $ 8 ,700 $ (2,200)i FWebb , $ 5,000 $ 2,000 $ 3,000 ,W $__�.__._.__ .-_ $ 2,00 �-$ ( 2,000) Fehr & Peers ( $ $ 2,000 1 $ ( 2,000) ____ _ - -- _' -4- ( Total! $ 32,330 ' $ 32,330 (1 Estimate based on Ja nuary 3, 2012 status Please let me know if you have any questions or concerns • Page 2 Exhibit A. EA Blumen Contract Amendment #1 t Contract Number: 4931 Vendor: EA ENGINEERING, SCIENCE & TECHNOLOGY, INC. DBA EA /BLUMEN CONSULTING GROUP, LLC Subject: SKIA Sub Area Plan Department: Comm Devel File Class: LEG 12 -1 Begin Date: 7/22/2010 End Date: 7/22/2011 Review Date: 1/1/2011 Vault Date: Comments: End Date Used As Estimate CITY OF BREMERTON TAX & LICENSE DIVISION 345 6th Street, Suite 600 • Bremerton WA 98337 -1873 • PHONE (360) 473 -5311 FAX (360) 473 -5200 BUSINESS LICENSE EA ENGINEERING SCIENCE AND License Number 28288 TECHNOLOGY, INC 11019 MCCORMICK RD Expires 12/31/2011 HUNT VALLEY, MD 21031 Location 720 6TH ST S, #100 KIRKLAND, WA 98033 License Type Business License This License must be posted in a conspicuous place at the business location This business license is not transferable or assignabb i n 720 Sixth Street South Suite 100 Kirkland WA 98033 Telephone 425 4517400 EA Engineering, Science, Fax 425 4517800 and Technology, Inc www eaest corn August 4, 2011 Carol L Etgen, MMC City Clerk City of Bremerton Financial Services 3456 th Street, Suite 600 Bremerton, WA 98337 -1873 Dear Ms Etgen, My name is Nimish Desai, and I am Vice - President and Pacific Business Director of EA Engineering, Science, and Technology, Inc We acquired the Blumen Consulting Group and are currently operating under the trade name of EA I Blumen If you have any additional questions regarding this issue, please free to email me at ndesai @eaest com, or call my mobile number at 253 223 3362 Sincerely, ,�z- i� 4 Nimish B Desai Vice President EA I Blumen Printed on sustainable wood forest paper using soy -based ink Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: 4931 BLUMEN CONSULTING GROUP, LLC SKIA Sub Area Plan Comm Devel LEG 12-1 7/22/2010 7/22/2011 1/1/2011 Comments: End Date Used As Estimate PROFESSIONAL SERVICES AGREEMENT SKIA Sub Area Plan The City of Bremerton ("City") and Blumen Consulting Group, LLC ("Consultant"), referred to collectively as the "Parties," enter into the following Agreement for professional services: I. Scope: The Consultant agrees to perform the services more specifically described in the Scope of Work, including any attachments thereto , attached hereto as Exhibit A, which is incorporated by reference herein. The Scope of Work may be modified only pursuant to Section VII.G. of this Agreement. If the Scope of Work provides for unspecified additional services such services shall only be performed upon the express written request of the City. Consultant further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices in effect at the time such services are performed. II. Term: The City and the Consultant agree that work will begin on the tasks described in Exhibit A immediately upon execution of this Agreement. The parties agree that the work described in Exhibit A is to be completed as provided for in the work schedule attached hereto as Exhibit B; provided however, that additional time shall be granted by the City for excusable delays or extra work as provided for in section IX (A) of this agreement. III. Compensation: In consideration of the services provided pursuant to this Agreement, the City shall pay Consultant in an amount not to exceed $400,000.00. Consultant's charges and bills shall conform to the fee schedule attached hereto as Exhibit C and incorporated herein by this reference. The Consultant shall submit regular billing statements detailing work performed and amount charged on each task or portion thereof. The descriptions shall conform to and fall within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a confortning billing statement, the City shall promptly process payment. PROVIDED, HOWEVER, the City reserves the right to prioritize scoped work and accelerate and/or delay work tasks under the time frame set forth in Section II herein. The Consultant's labor rates and billing fees shall be as delineated in Exhibit C. Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement. Consultant shall only be compensated for additional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be in accordance with Exhibit C. If a billing statement does not conform to this Agreement, the City may withhold payment until the statement is brought into compliance. Such withholding does not relieve Consultant of its obligations under this Agreement. Bremerton/Blumen SKIA Sub Area Plan Page 1 of 6 IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed in the Scope of Work and is performing independent functions and responsibilities within its field of expertise. Consultant and its personnel are independent Consultants and not employees of the City. Consultant and its personnel have no authority to bind the City or to control the City's employees and other Consultants. None of the benefits provided by the City to its employees, including, but not limited to, compensation, insurance, and unemployment insurance are available from the City to the employees, agents, representatives, or sub-Consultants of the Consultant. Consultant will be solely and entirely responsible for its acts and for the acts of Consultant's agents, employees, representatives and sub-Consultants during the performance of this Agreement. The City may, during the term of this Agreement, engage other independent Consultants to perform the same or similar work. As an independent Consultant, Consultant is responsible for its own management. The City's administration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Consultant or its personnel. As an independent Consultant, Consultant is responsible for payment of all taxes and licensing fees necessary to perform its obligations under this Agreement. These taxes and fees include but are not limited to State industrial insurance, Business & Occupation, State professional licensing, and City business licensing. If any taxes or fees due the City have been declared delinquent, the City may withhold the delinquent amount, plus any additional charges arising from the delinquency, from any payments due Consultant. V. Indemnification: Consultant shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the performance of this Agreement, except for that portion of the injuries and damages caused by the City's sole negligence. The City's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WANER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WANER. The provisions of this section shall survive the expiration or termination of this Agreement. Bremerton/Blumen SKIA Sub Area Plan Page 2 of 6 VI. Insurance: The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees, sub-consultants or sub-Consultants. Before beginning work on the project described in this Agreement, the Consultant shall provide a Certificate of Insurance evidencing: 1. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commercial General Liabilitv insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCU) if applicable; and employer's liability; and 3. Professional Liabilitv insurance with limits no less than $1,000,000 limit per occurrence/claim. Any payment of deductible or self insured retention shall be the sole responsibility of the Consultant. All required policies shall be provided on an "occurrence" basis except professional liability insurance (if required), which may be provided on a"claims-made" basis. The City shall be named as an additional insured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the City, which names the City as an additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all the required insurance policies and endorsements. The City further reserves the right to reject any unacceptable policies and/or endorsements. The Consultant's Commercial General Liability insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Consultant's insurance shall be primary insurance as respects the City and the City shall be given thirty (30) days prior written notice by certified mail, return receipt requested, of any cancellation, suspension or material change in coverage. The City also reserves its unqualified right to require at any time and for any reason, proof of coverage in the form of a duplicate of the insurance policy with all endorsements as evidence of coverage. VII. General Conditions: Bremerton/Blumen SKIA Sub Area Plan Page 3 of 6 A. Reports and Information: When requested by the City, Consultant shall furnish periodic reports and documents on matters covered by this Agreement. The reports and documents shall be furnished in the time and form requested. Consultant shall maintain accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to substantiate all billed amounts. B. Ownership and Use of Records and Documents: Original documents, drawings, designs and reports, including those in electronic format, developed under this Agreement are the property of the City. All written information submitted by the City to the Consultant in connection with the services performed by the Consultant under this Agreement will be safeguarded by the Consultant to at least the same extent as the Consultant safeguards like information relating to its own business. If such information is publicly available or is already in Consultant's possession or known to it, or is rightfully obtained by the Consultant from third parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise. All data, documents and files created by Consultant under this Agreement may be stored at Consultant's office in Kirkland, Washington. Consultant shall make such data, documents, and files available to the City upon its request at all reasonable times for the purpose of editing, modifying and updating as necessary until such time as the City is capable of storing such information in the City's offices. Duplicate copies of this information shall be provided to the City upon its request, and at reasonable cost. All documents, including all reports, drawings, specifications, computer software or other items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service with respect to the project and are the property of the City. Any reuse by the City for other than the specific purpose intended will be at City's sole risk. C. Work Performed at Consultant's Risk: Consultant shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and sub-consultants in the performance of the work hereunder and shall utilize all protection necessary for that purpose. All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. D. Place of Work: The Consultant shall perform the work authorized under this Agreement at its offices in Kirkland, Washington. Meetings with the City staff as described in Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties. E. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. F. Severabilitv: Should any part of this Agreement be found void, the balance of the Agreement shall remain in full force and effect. Bremerton/Blumen SKIA Sub Area Plan Page 4 of 6 G. Modification: This Agreement may only be modified by written instrument signed by both Parties. H. Written Notices: All communications regarding this Agreement shall be sent to the parties at the addresses listed below by registered or lst class mail, or by personal service, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. City Address Andrea Spencer City of Bremerton 345 Sixth St., Suite 600 Bremerton, WA 98337 Consultant Address Deborah Munkberg Blumen Consulting Group, LLC 720 Sixth Street S. Suite 100 Kirkland, WA 98033 I. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be deemed waiver of any other right or power. J. Non-Waiver of Breach: The failure of the City to insist upon strict performance of any of the covenants and agreements contained herein, or to exercise any option herein conferred in one or more instances shall not be construed to be a waiver or relinquishment of said covenants, agreements or options, and the same shall be and remain in full force and effect. K. Compliance with Laws: Consultant shall comply with all applicable Federal, State, and local laws in performing its obligations under this Agreement. L. Choice of Law and Venue: This Agreement shall be interpreted according to the laws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in Kitsap County Superior Court. M. Attorneys' Fees: In the event of litigation to enforce any of the terms or provisions herein, each party shall pay all its own costs and attorney's fees. N. Assigmment: Any assignment of this agreement by the Contractor without the written consent of the City shall be void. VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the public on the basis of race, color, national origin, sex, religion, age, marital status, disability, or sexual orientation except for employment actions based on bona fide occupational qualification. IX. Termination: This Agreement shall remain in force until completion and acceptance of the services, terminated by written instrument upon mutual consent, or by the City of Bremerton for convenience. This Agreement may be immediately terminated for cause by a Party if the other Party substantially fails to perform through no fault of the terminating Party, and the non- performing Party does not commence correction of the failure of performance within thirty (30) Bremerton/Blumen SKIA Sub Area Plan Page 5 of 6 days of the terminating Party's sending notice to the non-performing Party. Any Notice by Consultant shall include a report showing the status of all items listed in the Scope of Work current through the termination date. If the City receives reimbursement by any federal, state, or other source for work described in Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is cancelled or substantially reduced after the execution date of this Agreement and prior to the completion of the work, the City may summarily terminate this Agreement. A. Excusable Delays: The right of Consultant to proceed shall not be terminated nor shall Consultant be charged with liquidated damages for any delays in the completion of the work due to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials, equipment, tools, or labor by reason of war, national defense, or other national emergency; 2) any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God, fires, floods, strikes, or weather of unusual severity. PROVIDED, HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement, the delay is properly excusable, the City shall, in writing, extend the time for completing the work for a period of time commensurate with the period of excusable delay. B. Ri h�pon Termination: In the event of termination, the City shall pay for all services performed by the Consultant to the effective date of termination, as described on a final invoice submitted to the City. After termination, the City may take possession of all records and data within the Consultant's possession pertaining to this project which may be used by the City without resfiction. Any such use not related to the project which Consultant was contracted to perform shall be without liability or legal exposure to the Consultant. CITY OF BREMERTON CONSULTANT Bre erton City Attorney R:\LEGAL\Contracts�FORMS�Professional Services Agreement Form (2003).doc LvM C�vLS.���i w �i� Bv: c ��z t•,c�r��v�.,�� v�ici � 1tS:�� ��.p f.l - V ��.�, f�S ��..� Date: `z 1 z-1 / to Attest: � � ��� City C1 k Bremerton/Blumen SKIA Sub Area Plan Page 6 of 6 Exhibit A: Scope of Services City of Bremerton South Kitsap Industrial Area (SKIA) Comprehensive Master Plan and Planned Action EIS The City of Bremerton (City) has received a Climate Showcase Communiues grant from the US Environmental Protection Agency to complete a comprehensive master plan and planned action EIS for the South Kitsap Manufacturing and Industrial Center. Key project objectives include economic development and job creation; protection of natural systems, reductions in greenhouse gas emissions and increased sustainability; and development of innovative and sustainable infrastructure. The City is also seeking a public outreach effort that is inclusive and provides transparency in the planning process. In order to meet the grant requirements and the City's schedule, this project is andcipated to be complete by January 2012. The City has retained rhe Blumen Consuldng Group team (Consultant) to provide consuldng services to support this project. This scope of services (Exhibit A) describes the tasks, roles and responsibilities and assumptions associated with completion of tasks for this project. Exhibits B and C provide the project schedule and budget, respectively. Task 1: Project Initiation .......................................�-�-�--�--------�--...............................................-----------------------�---........................_ 1.1 Conduct Project Kick-off Consultant will facilitate a workshop with the project team, including City staff, to discuss fundamental project goals, approach, constraints and opportunities. The workshop will specifically address: • Desired outcomes and goals for the project • Elements to be included in the project � Inidal project priorities • Potential challenges that may impact project progress and goals • Data needs • Alternative scenarios The workshop will also address administrative process to ensure a well-run project, including the following: • Planned work products • Schedule and key milestones • Roles and responsibilities � Final scope of services and budget • Steps to ensure compliance with the EPA Climate Communities Showcase grant 1.2 Refine public outreach and visioning strategy Public outreach will be focused on two tracks: � General outreach within the region (City of Bremerton, Kitsap and Mason counties) at key project milestones to promote awareness and encourage review and comments; and • More focused outreach and collaborative problem solving with SKI11 property owners, affected stakeholders and agencies. Consultant will meet with City staff to understand existing public outreach practices and lessons learned from past projects. This meeting will include a review of roles for City and Consultant, identification of tasks where Consultant can provide the most value, and discussion of an outreach schedule that integrates general outreach activides with more focused efforts to involve stakeholders that are most direcdy affected. 07.13.10 Task 1 Deliverables: Project charter describing priorities, desired outcomes and goals, project team roles and responsibilities, schedule, and budget Kick-off ineeting summary Data needs list Task 2: Feasibility/Suitability Analysis ---...--�-----� ...............................�--........_...........................................--�---.....----------------------�------��----........._ 2.1 Prepare market study Consultant will prepare a market study addressing potential development opportunities in the study area. The market study will provide regional economic context for SKIA strategies by identifying emerging opportunities in Clean Technology and other green industrial sectors, as well as opportunities from all industry sectors, to rank target industries. The market research will examine regional trends and forecasts in the context of regional economic strategies to understand where regional priorities may shape industry growth. The analysis will frame SKIA's comparative advantages within the region with both near-term and long- term horizons. Near-term analysis will assess real estate market conditions to inform implementation strategies and identify potential early successes for SKIA. Longer-term analysis will look at regional trends and forecasts to understand how SKIA can participate in regional economic growth. Annual absorption scenarios will link findings from near-term and long-term analysis to serve phasing of the plan. 2.2 Prepare existing conditions analyses Consultant will develop baseline existing conditions data for the elements of the environment listed in Task 3.1. This baseline data will provide a starting point for considering potential options for sustainable and green development patterns, identifying opportunities and constraints offered by the natural ecology, land forms, and location of e�cisting services. This information will also serve as the e�cisting condidons section of the SEPA Planned Action EIS. 2.3 Conduct suitability analysis Built on the tenets of a McHarg-style, holistic analysis, Consultant will conduct a site suitability analysis in which various environmental constraints to development are identified, classified and combined to create a map of overall development suitability. The analysis helps guide the project team regarding development opportunities and constraints for the study area. 2.4 Develop preliminary alternatives Based on the findings of the market study, suitability analysis and other data, Consultant will prepare alternatives for consideration in the master plan process and analysis in the SEPA Planned Action EIS. The alternatives will include a description of the planning envelope of anticipated development in the study area, building typologies, roadway network, and infrastructure improvements. Depending on the findings of the market and suitability analyses, the alternatives may establish a phased development schedule or focus on specific opportunity sites or desirables uses. One no-acaon alternative and two acdon alternatives are assumed. 2.5 SEPA EIS Scoping The Consultant will prepare a combined Draft Determination of Significance/Scoping Notice describing the integrated Master Plan and EIS process. The City will be responsible for printing, distribution and publishing of the scoping notice. A public meeting to invite comments on the proposed scope will be conducted during the 21-day comment period (see Task 7.4). Following the close of the scoping period, the Consultant and City will joindy review scoping comments and finalize the scope of the EIS. 07.13.10 Task 2 Deliverables: • Market study � Existing conditions analysis • Land use suitability analysis • Preliminary descripdon of alternatives for master planning and SEPA EIS review • EIS Scoping document and notice for City printing, distribution and publishing Task 3: Create Policy Framework -------- -� - -- --�---------- � - ------ -----------------------�--...... ...... ... _ 3.1 Evaluate potential impacts of alternatives Consultant will evaluate potential impacts associated with the alternatives. This analysis will inform the development of preliminary master plan policies as well as form the basis for the Planned Action EIS impact analysis. Although the scope of the environmental review will not be determined until scoping is complete, this scope of services assumes inclusion of the environmental topics listed below. Following the close of the Scoping Period, the City and Consultant will joindy determine whether there is a need for a change in the environmental topics and tasks described below (see Task 2.5). 3.1. Natural Environment This category encompasses earth, water, and plants and animals. Consultant will address these topics at a qualitative level. A thorough review of literature relating to wildlife, fish, wedands, waterways, critical areas, geologically hazardous areas, water supply and recharge, and hydric soils will be conducted. The Consultant will review GIS layers and other available data and will conduct a field reconnaissance visit to verify conclusions. 3.2.1 Air Quality. Based on research conducted for the Washington Department of Commerce, Consultant will develop an Air Quality Calculator quick response tool to quantify the emissions impacts of the different alternatives. It is envisioned that this calculator will be rooted in the King County SEPA spreadsheet, but based on the results of the Department of Commerce report, Consultant will make revisions to increase overall accuracy. The Air Quality Calculator tool will also be enhanced to reflect project-specific information regarding green development measures, innovative water treatment and reuse solutions, and transportation measures proposed for the master plan. 3.1.3 Land Use/Plans and Polieies. Consultant will compare and evaluate the proposed amount, types, scale and pattern of uses in comparison with the existing land use pattern. The analysis will include consideration of compatibility of the proposed development with existing and planned development in the surrounding area. Land use consistency with Bremerton National Airport operations will be considered. A discussion of the relaaonship of the proposal to relevant plans, policies and regulations will also be included. Consultant will analyze and quantify the number and type of jobs expected to be created, including number of jobs and amount of wages by industry and occupation. 3.1.4 Cultural Resourees. Consultant will review existing data for cultural resources for the project area. Consultant will develop mitigation recommendations to address possible future land use activides and to provide guidance for the long term management of the project area. This will involve consultation with agencies and tribes to ensure that exisang cultural policies are integrated with the proposed action. 3.1.5 Aestheties. Consultant will describe the overall aesthetic character of the study area in terms of the quality of the urban environment, the design and character of eYisdng buildings, and building height, bulk and scale. The evaluadon will consider the nature and magnitude of change envisioned by the proposal' and alternatives, including internal study area and external compatibility, and building height, bulk and scale. 3.1.6 Transportation. Based on sustainable development strategies and transportation demand management strategies associated with each alternative, Consultant will determine the existing level of 07.13.10 service at up to 10 study facilities (intersections, roadway segments, etc.) and the level of automobile and truck traffic generation. Based on this trip generation estimate and the existing background traffic conditions, Consultant will estimate future traffic flows, calculate levels of service, identify potential project impacts, and develop mitigation measures on the 10 study facilities. Results will be presented on maps to clearly illustrate the transportation impacts of the project. 3.1.7 Public Services. Consultant will review e�sting levels of service, esamated needs and demand for service, and projected levels of service under each alternaave for police and fire protection, and other public services as determined through the scoping process. Calls for service, response times, incident rates and similar metrics will be used to identify the unique public safety needs of the kinds of development that is planned for SKIA. Consultant will compare the public safety needs to Bremerton's current public safety capacity and capability and identify any needed augmentation of City public safety services. The analysis will include both operating costs and capital costs. 31.8 Utilities. Consultant will review existing levels of service, estimated needs and demand for service, and projected levels of service under each alternative for sanitary sewer, domestic water, stormwater, and other utilities as determined through the scoping process. Consultant will review available utility planning documents and compare those findings with projections developed under this study. The utility analysis will consider a variety of approaches at various scales and include distributed and centralized approaches. The analysis will focus on considering approaches that are closed loop or highly resource efficient and are able to contribute to more than one project goal. 3.2 Prepare goals and principles for development Consultant will prepare draft SKIA master plan policies and principles. Goals and policies will address the protection of the natural environment, economic development, land use patterns, greenhouse gas reduction, building form, transportation, public services and infrastructure. Policies will be sufficiendy detailed to provide clear guidance for the creation of zoning designations and development regulations. Key concepts related to energy efficiency and sustainability will be emphasized. 3.3 Prepare implementing regulations Consultant will identify a range of possible zoning tools that could be used to implement SKIA development. Possibilities include revision of the City's e�sdng Employment Center (EC zone), development of a new SKIA-specific zoning classification, combining procedures and/or substantive provisions. Consultant will prepare an issue paper analysis of potential zoning options. Following City review and direction, Consultant will draft policy and regulatory language for review and refinement by City staff, advisory and elected officials, and the public. The Consultant will customize specific LID standards for SKIA based on the types of uses proposed, the specific soils found and other project objectives. Regulaaons will address: • Lot coverage/impervious surface standards • Landscape and native vegetation retention standards • Cluster requirements • Grading, clearing, and tree harvesting • Road standards and details • Drainage standards and details Task 3 Deliverables: Environmental impact analysis Draft master plan goals and principles, Draft regulatory framework and code text 07.13.10 Task 4: Develop Physical Plan and Implementation Strategies ......-�-� .................................................................................................�-------------------------�--�---................. 4.1 Prepare conceptual land use maps For each alternative, Consultant will prepare a conceptual land use map that identifies land use designations within the study area consistent with the Manufacturing and Industrial Center designation, consistent with aviation transportation needs, and with the Suitability/Feasibility analysis conducted as part of Task 2. Maps will be prepared in conjunction with Task 2.4, Preliminary Alternatives Description. Land use designations will reflect the policy goals, discussed in Task 3.2. 4.2 Prepare draft and refined capital facilities plan Consultant will prepare a draft and refined capital facilities plan for the preferred alternative. The capital facilities plan (CFP) will be consistent with GMA requirements and the City of Bremerton Comprehensive Plan. Required elements will include (1) an inventory of e�cisting public facilities, (2) forecasts of future needs, (3) capital improvement projects that will address the needs, (4) a financing plan to pay for the capital improvements, and (5) coordination of the CFP and the land use plan. The CFP will include a phasing schedule to coincide with strategic development needs for preferred alternative absorption. The CFP will idenufy innovative, green infrastructure measures that will benefit and midgate impacts of future SKIA development. The transportaaon, water and wastewater elements of the CFP will include design solutions to preserve ecological features, minimize GHG emissions and ensure long-term sustainability. Planning-level cost estimates will be provided in 2010 dollars based on recent contractor bids in the area. The financing plan will identify underused, unused, and new sources of funding in addition to e�cisting funding for SKIA infrastructure. Consultant will provide estimates of the amount of revenue that can be expected from each source, strategies for obtaining the funding, and will identify sufficient revenue to fund the proposed infrastructure. 4.3 Compile Draft Master Plan Based on the preliminary analysis, public and agency comment (see Task �, and City direction, the Consultant will compile the information developed in Tasks 2, 3 and 4 for the draft Master Plan. The draft Master Plan will include a land use map, goals and principles, a greenhouse gas reduction plan, a capital facilities plan, and implementing regulations. As needed, the draft Master Plan will include a description of the differences between plan alternatives. Task 4 Deliverables: Draft land use maps for each alternative Draft and refined capital facilities plans Draft master plan Task 5: Environmental Review --------. ..- ----- --- ------- ------ - - .. .... .... � -----�----------------------------�--..... . ..... _. 5.1 Compile preliminary Draft Planned Action EIS Based on the work completed in Tasks 2, 3 and 4, the Consultant will compile information to prepare the preliminary draft Planned Action EIS for City review. 5.2 Draft Planned Action EIS Based on City comments on the preliminary draft EIS, the Consultant will prepare a Draft Planned Action EIS for public review. The Draft Planned Action EIS will include a draft Planned Action Ordinance for public review and comment. As established in WAC 197-11-168, the ordinance will address the rype of project action; compliance with the criteria for a planned action; findings related to 07.13.10 the adequacy of the Planned Acdon EIS; and mitigating measures required to qualify future projects as planned actions. 5.3 Final Planned Action EIS The Final EIS will include a descripdon of the preferred alternative, updated analysis and corrections if needed and responses to agency and public comments. The Consultant will prepare a preliminary final Planned Action EIS for City review and comment. Based on City comments, Consultant will prepare a Final Planned Action EIS for public issuance. Task 5 Deliverables: Preliminaty and public Draft Planned Action EIS Preliminary and public Final Planned Action EIS Task 6: Adoption and Implementation ...............................................�----�-----................................................-�------............_......---........... 6.1 Final Master Plan, regulations, and Capital Facilities Plan Based on City direction, identification of the preferred altemative and any other changes reflected in the Final Planned Action EIS, and public and agency comment, the Consultant will finalize the Master Plan, associated Capital Facilities Plan, and implementing regulations for City review and adoption. 6.2 Final Planned Action Ordinance Based on comment and City direction, the Planned Action EIS mitigating measures, and the draft Planned Action ordinance, the Consultant will finalize the proposed ordinance for City review and adoption. Consultant will include a tracking tool that the City can use to monitor the amount of development occurring in the Planned Action area to ensure that it is within the thresholds of the adopted Planned Action, and to coordinate the timing of improvements. Consultant will also develop a streamlined SEPA checklist that the City can use to evaluate proposed projects and to make Planned Action determinations. Task 6 Deliverables: • Final SKIA Master Plan � LID regulations • Capital Facilities Plan • Planned Action Ordinance, and administrative guidance procedures Task 7: Public Outreach --------- -- ---------- ------ .._.. ..... ..------------------------ -----------� . . .. . 7.1 Stakeholder Interviews Consultant will conduct eight (8) interviews with selected stakeholders. Based on input from the City about key stakeholder contacts, Consultant will schedule interview dates, conduct telephone interviews, prepare summary notes, and prepare a bulleted stakeholder interview summaty. The summary will provide a review of key themes, potential communication obstacles, most effective ways to communicate with stakeholders; and recommendations for successful public communication through the project. 7.2 Key Messages and Project Identity Based on input from the stakeholder interviews and discussions with the project team, Consultant will develop key messages for project communication. This will include integration with the project identity/branding effort to support consistent communication for all project team members, community influencers, and all project materials. The project identity will include a"project logo" that incorporates a consistent project name and graphicallook including font, graphic layout and color. 07.13.10 g 7.3 Communication Materials Consultant will develop communication materials to publicize public outreach events, summarize technical information and communicate key project milestones to the public and interested stakeholders. Consultant will develop three (3) postcards to advertise the three public meetings; seven (7) fact sheets to summarize key project topics including sewer, employment, marketability, sustainability, etc; one (1) comment card; three (3) media releases; three (3) calendar announcements; three (3) newsletter articles. Consultant will write copy and coordinate design consistent with the project identity/brand developed in Task 7.2. Materials will be provided to the City for printing for direct mail and manual distribution at meetings, and provided in electronic version for posting on the City website. 7.4 Community Meetings Consultant will plan and facilitate three community meetings at three project milestones: 1) project visioning/SEPA scoping; 2) draft policies/Draft EIS comments; 3) final draft plan/planned action ordinance prior to adoption. For the first workshop, Consultant will plan and facilitate a community visioning workshop to share information about the project and process, solicit input to assist in developing an overall vision, and solicit input on the scope of the planned action EIS (see Task 2.5). This workshop will be designed to attract audiences direcdy and indirecdy impacted by the planning effort, will be creatively designed to allow maacimum interaction of participants, and will identify strengths, weaknesses and opportunities. For each community meeting, Consultant will work with the project team to develop the agenda, design the meeting including specific activities for small group interaction, if appropriate, coordinate the development of materials, set-up/tear-down, and develop a workshop summary. 7.5 Stakeholder Meetings & Focus Groups Consultant will schedule, coordinate, attend and facilitate up to eight (8) stakeholder meetings and/or focus groups. The content, participants and design of each will be determined in discussion with the City and will be designed to be fle�cible to address different project challenges and the need for more in-depth interaction with various stakeholders who are impacted by different aspects of the project. This may include a series of ineetings with an ad hoc working group or several one-time meetings of working groups of different participants. For example, Consultant may coordinate a focus group on the issue of wastewater infrastructure, which may include other agencies, SKIA property owners and technical team leads. Consultant may also coordinate several meetings with SKIA property owners to address specific land use policies within the master plan and/or address incompatibilities, conflicts or other issues between landowners, the City and other jurisdicdons. Consultant will design these meetings in collaboration with the project team and may include smaller subsets of stakeholders around different planning issues. At least some of these meetings will include all property owners, and, with leadership of a neutral facilitator, will focus on reaching agreement on specific master plan components. These meetings may also include expert panel presentations, especially in the areas of innovation infrastructure planning, green house gas reduction, green building techniques and handling of environmental issues. Task 7 Deliverables: • Stakeholder Interview Summary • Public Workshops • Communication Materials • Stakeholder Focus Groups Task 8: Project Management ......-� ........................�---....----------.................................-------..............--------------------------- The Consultant will provide ongoing schedule and budget management, communication with the City, monthly (or more frequent) progress reports and other administrative oversight as needed to ensure successful project implementation. 07.13.10 General Assumptions ............................................................................................................�---�--�------------------------............... The scope and budget contained in this document are predicated upon the following provisions, assumptions and conditions. The purpose of this list is to enumerate and describe mutual expectations and understandings required of a11 parties to this scope of services in order to complete the project on time and within budget. Additional service requests or alteraaons beyond those described in this document will require supplemental contract modifications or explicit, pre-approved subsatuaons. Consultant will not perform additional work without written authorization from the City. 1. The City may eliminate any task and associated contract hours/fees at any point throughout the contract period and will provide written notification of the task elimination to the consultant. Consultant shall be paid for any task and associated contract hours/fees prior to notification of cancellation. 2. The scope does not include field reconnaissance of critical areas or other original data collection except as explicidy described in this scope. Research and data collection will be based on readily available secondary sources of information, including reports, inventories, maps and other similar literature from local government and other sources. 3. All Consultant deliverables will be limited to electronic file transfers. The City is responsible for document reproduction and distribution of all review and final drafts. 4. The budget presents cost estimates for each task. Time may be transferred from one task to another due to greater or lesser level of effort, provided that each task shall be completed and the total budget shall not be exceeded. 5. The Consultant will have primary responsibility for coordinating, reviewing, and editing information obtained from the team members to ensure that the individual sections of the Plan/EIS are prepared as one cohesive document consistent in style and content. 6. The City will provide available necessary government documents, studies, site plans, GIS data layers and mapping and other technical information pertaining to the study area, including any appropriate electronic GIS data, aerial photos, and drawings of areas within the project study area. All documents will be returned to the County/City as appropriate upon completion of this contract. 7. The City will consolidate all internal staff review comments on draft review documents and provide a single, complete set of comments to the Consultant for revisions. Unless otherwise noted, Consultant assumes one round of review for all draft documents. 8. The Consultant is not responsible for delays in the schedule resulting from delays in the provision of critical information or in decision-making by City staff, elected or appointed boards, commissions or citizen groups. 9. The Consultant will provide project updates and other information suitable for posting on the City's website; the City is responsible for website updates of available project materials. 10. City staff will be responsible for meeting nodces, room arrangements and other logisdcs for public meetings. If recording or meeting notes are desired or required, those will be arranged or provided and paid for by the City. 11. This scope of services does not include assistance with or representation by any member of the Consultant Team at legal and quasi-judicial appeals. 07.13.10 � Exhibit C: Cost Estimate 0 ' 0 0 � � ' s e - • • • -o ` • Subcontractor Equinox Blumen Henderson Melinda Weinman Research and Consulting Community Chris Webb Fehr 8 Young 8� Posner Consulting Consulting Labor Total Task Group Attributes Associates Peers Company Consulting LLC AHBL International Landau Mithun Subtotal Total Price ---__� __._ ___�_ __ a_._____----_.._ _._.�_ ��__.�__ _---..___ __....___ __m._.____..� - ._ ___ ___ ___�.-.--- - ---__.---- ----- �____ Task L• Project Initiation _. �._. .__ .�_. ___ _ __._____.____._ _ ___ _---_ ___ _ �---- -__ �___._------ --________ _.�...__._. � ---_-______.____�__.__.,_�________�_..--.�__._._.____�_____. __._ _. _�______.___ ____.___ ______---------- �__----___._ __..._______.------------- -____.__- ---------------___----- --____,_,--------�__,y_,_ _�_____.- ---------- 1.1 Conduct Project Kick-off $2,550 $1,000 $1,000 $1,000 $1,320 $560 $1,000 $1,000 $500 $1,000 $1,000 $9,380 $11,930 1.2 Refine public outreach and visioning strategy $600 $560 $560 $1,160 --------_.-_�.__--_.-__._____.__.___.__._______��--------- -___..___^__ _. _._-------____-__-_ ---- -_________ _-------___._. ________--- --------_.�.._ __._.__.___ ___.______.___ ___.____------- -__ _._._. __�_�_. _____----- - - --- -- Task 2: Feaslbllity/Suitabllity Analysfs -----_� _. _� _ ___e_ _� .___._ _.__ _.._ ._. _. ._� .�__ __. _ _----- -.--_ �___. �__._�.___.- ----- _ __ ___ �__.____..._. _,._ _ _._ _ ., .__ � __. _----- --._ _ _ ____._.....___ ____. ..__ a_ , . ..__ _ __ __.... _._ __ ___._._ ___ _ , _._ � _ .__ _.__.._. .. _____. ___._ __... __.�� _ _- - -- ---_ �._ ___ _____ _ .. 2.1 Prepare market study $900 $18,000 $18,000 $18,900 2.2 Prepare existing conditions analyses $9,200 $5,000 $10,000 $1,400 $4,000 $3,500 $15,000 $3,000 $41,900 � $51,100 23 Conduct suitability analysis $3,300 $12,000 $12,000 $15,300 2.4 Develop preliminary alternatives $7,600 $1,200 $1,400 $1,400 $1,400 $1,400 $1,400 $1,400 $9,600 $17,200 2.5 SEPA EIS Scoping $ 1,550 $0 $1,550 , __---` __ ____,_T ___- ------------------ ---____ _� _� _ .--- -_ __ _. __ _ _g__.._.__._ _�_ ---__ __ __ _. __ _._ _ _ _ _�_. _� ___. _�. ___ _ __ ._ � . ___- Task 3: Create Policy Framework - - - - - - -__.___ ---. - -.__._.�_ _-- .- - __,_ ._._��__�..__...__M.�.._.__._�_.,__._.__�_.____._-_,._.�,_---------.__...__.____�._.-----�.�__,_._______.__----�__.___.._-------_�.._-----------�,._---------___�._------------��____________..._____....�_----___._�_.__----____.--.._ _..__�._..._ 3.1 Evaluate potential impacts of alternatives $5,600 $5,000 $10,000 $5,000 $3,600 $2,500 $5,000 $4,000 $35,100 $40,700 3.2 Prepare goals and principles for development $3,400 $2,000 $5,000 $5,000 $5,000 $2,000 $7,000 $3,600 $29,600 $33,000 3.3 Prepare imp LID regulations $4,400 $5,000 $5,000 $8,000 $7,000 $2,000 $27,000 $31,400 ---___..___---------- ---------__.�____T_--��__ ___._�_____..._-_._� -______� --.�__� -______Y----------------------� �._,_ . _.�__�.__�_._.--- ----------------_�_ �_____..___� _____��_ _______-- Task 4: Develop Physical Plan and Implementation Strategies _-___��_____.W_w�._..__ _.___.�_____ _._.___---___- __v__ __�,_._e.�_- ----v__�.----.��._____ ---- _ .__.__------__ _______�._ ____._______ _.__._.__� w.�__.�,�� ,_�_._ __- ---------- -___________� __.._�___ _. __._�_ 4.1 Prepare conceptual land use maps $4,400 $6,000 $6,000 $10,400 4.2 Prepare capital facilities plans $3,400 $5,000 $7,000 $10,000 $22,000 $25,400 4.3 Compile draft Master Plan $10,600 $1,000 $1,000 $1,000 $1,000 $1,000 $5,000 $15,600 ________�._.______.___ ___.w.______��. M..._ _ �.._a_. __._ __ _--_.___._� _ ------_.�_ _ _____ _�_.__ __-_.._ --- --------- ___-__._-___._ ------�_ __ _�--� .-----_�_.__ _____--.---- ---- -_..__ - ---_�,___.- ---.__�.__ Task 5: Environmental Review - _ v � ------ --_.._ _ � _._______ __��_----____�..__�_--------.--- ------------__ ______-._..__. __. _�____._.� ___._.____.-- --.-______--- ------------___...___ ___.____ ____���________ ___._...��.- -.----_.___ _._ _�__� �_.__.--- ---_.__ _-- 5.1 Compile PDEIS $10,200 $1,000 $1,000 $1,000 $280 $1,000 $1,000 $1,000 $6,280 $16,480 5.2 Prepare Draft EIS $6,200 $500 $500 $500 $2,000 $500 $500 $500 $5,000 $11,200 53 Prepare Final EIS $19,100 $2,000 $3,000 $2,000 $1,500 $2,000 $10,500 $29,600 ___ ___`..�-----__ . �. P...-°---- -.___._�_______ �_�__�___�________ -.----------_._ _____ _.,_e,_ _.___. _._____ _. ______.-- - ----- --_�___ __ _ Task 6: Adoption and implementation - - - - --- -- - ___ _._ ___ � ___._ ��_ _._____ -------______.____Y___�___._._____�_..���...____._._�_�__.�.____._,_____�.__.,___._____.�._._.,------ ----.._.�__ _____--.___-------__..______._____.__._._._.__�____._____.____.��------.-----__�,_�__ ____�_____..___.__..._.___------- 6.1 Finalize Master Plan, LID regulations, and CFP $7,400 $500 $2,500 $1,000 $1,000 $1,000 $500 $1,000 $7,500 $14,900 6.2 Finalize Planned A ction ordinance $1,200 $1,000 $1 ,000 $2,200 ___ �_ ___------�. ____.�_ _ __ �__� �. � __ _ _ _� __. __�__ _. ._ _ ___ ._.__._ ______�- _. __ _ _ _ _ w _._ .___ _.__ _. __. _...____ _ �-- �_ _._ _ _ �___ � _� ___ _ �� __ � __�__ _ .______.__ _ _. _���_ Task 7: Public Outreach v __�____._ .___�.__.�_�.__.__._.__.__.__._________.__________..� __ ______.-. �.__.__ .-�_ ______ _.._._,_ _��__._._ ___.______.____M_�..__d_ --.-----___.�_ ____________.____�._.._. _._._._ .____.___.�s_.__ _._________... __ _____._�_ ---------- 7.1 Stakeholder interviews $0 $2,240 $2,240 $2,240 7.2 Key messages & project identity $600 $1,680 $1,680 $2,280 7.3 Communication Materials $800 $3,500 $3,500 $4,300 7.4 Community Meetings (3) $1,800 $1,000 $1,000 $1,000 $7,280 $1,000 $11,280 $13,080 7.5 Stakeholder meetings & focus groups $600 $ 5,460 $5,460 $6,060 ____--___�._.___.��__--,___________.,_____u_�._�.__w.____.__.__�.___.__�.e_._._.__________,_�_.___.__.��_____ d_._____ Task 8: Project Management __.____.._ ___.__ . _�___.__ _ __ ___. __ _ _ _ __ �_.._ __.__._. _ ___ �� 8.1 Project management and meetings � � $11,040 �� $500 �� $500 � $500 � $500 ������ � $500 � $500 �� � $300 � $500 � $500 $4,300 $15,340 �� Total hours $274,880 Subtotals $116,440 $23,700 $33,900 $48,900 $28,720 $21,560 $16,900 $36,500 $6,800 $33,500 $24,400 $274,880 $391,320 DirectExpenses $1,700 $500 $500 $2,000 $500 $970 $500 $500 $500 $500 $500 $8,670 Total pnce $118,140 $24,200 $34,400 $50,900 $29,220 $22,530 $17,400 $37,000 $7,300 $34,000 $24,900 $399,990 07.13.10 10 Exhibit B: Project Schedule TaskiPro jectlnitlaUon � Projcct iniaauon activiacs�� �� A � Task 2 Feaslbility/Suitability Anatysis __ _._..__._ _�___�___ _ ____ _ __ Preparc markct study Prcparc cwsdng condiuons anal}'sis Conduct suitablity analysis Dcvclop prclimmary altcmauvcs scrn eis s�o�,n _ � _.__e ___�� _____ __ __ _.__ _ __ e.___,____,__ __� Task 3 Policy Framework � �� �� . � ��� � . _� ������ . . _! . �_..._..___._.____�__.---_--_._ _._._ `r_ _e_ e._._._ !___a__....� __a_ _i__._______ _w___t __-----,�____� � �..� _. �___� ,_.,. __. _,' .. _e___ ____ ___. .. �_..� �_,_..- - � �� ' __ � _._.. t y i � � i � , i �-� --,.> f i � ! �, j : , � � � < < ' �� � ` � i _.i_ ____ .a.________�_____� ._.___.�_._ __.__��_______ �_, ,___.._a___________.�____.___�___,_ ; � -' j -�--- °�°�r��=.,- _ � -! o ����_._ .� � � � � E C � ( �'~ � ' � �� Evaluatc potcnual impacts of altcrnativcs nrcparc goals and pnnciplcs for dcvclopmcnt Preparc implcmcnung rcgula�ons Task 4 Develop Physical Plan and Impiementatlon Strategies � � Prepare eoneeptual land use maps � �� y^ Preparc capital facili�cs plans Compilc draf[ 1�Iastcr Plan ^ Task 5 Environmental Revlew _ � � �� � .� Compilc preliminary Draft Planned Acaon EiS �._.�___,_.....___.. __.�...__�� ...,._��__._�._ _...,._..�.._, -_.._...----__7._._...�. �u.�, � � _ _ . _ _._.___._._,.,..._ __LL �___ Prcpare pubGc Draft Planncd Acuon EIS �' Prepam prclimmary and public Final HIS ' ____.�_--_----.____ �_�___.._�__.__._._�_..__.___._.._____ .___-----_.__..___.___1___._.. Task 6 AdopUon and Im plementation Finalizc :�Iastcr Plan, L1D regulauons and Capital FaciLucs Plan � i� Finalize Planncd Acdon Ordinanec f ! Task 7 Pu blic Out reac h .� ��__ _ , __ ___ _ _---- __._____ _x_--. � Public and Agcncy Outrcach �_ .___—W--- �� i � ` _ . _ __ s._._1 _—____;�.� `���} ..e.��� .� U � � � �� i a !,ue �,� I � � T � 1 � _ �...___..v_d ' i ' ' � E ___._._. ___�..._� __. __--- _____ ._. �___ ._._.__ ._ _ ._� __.e�..__.__.. _____ _.� ' _ L , r �..._____._ _�_.___.__m. � � �.__ i �.�.______.�..�_ � '.� : � __ � _, I � � � � � � f j , �,� : � � ' —� � ___.___ _�. _ _ ____ � --- �_._._ __.. �.___ __. _ _ _._. _ _-.-- �__,_.____ _---- _ �e . __ ___.__ _.__�__.d�---__ . __�__ -_---_ � � � ' f � ongoing as determined in Pro�ect Inftfation � t7�i0 c c cg l�. _ � t— ""j` — *�' AdopUOn 07.13.10 g