HomeMy WebLinkAbout01/20/2010 5F r
DATE SUBMITTED: January 6, 2010 �
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
.......................................................................................�
SUBJECT: Approval of proposed Schedule Committee Meeting Date: January 13, 2010
74 Conversion with Puget Sound Energy in COLJNCIL MEETING Date: January 20, 2010
Conjunction with the Manette Bridge Department: PW&U
Replacement Project. Presenter: Michael Mecham
Phone: 473-5288
SUMMARY: With the replacement of the Manette Bridge by the Washington State Department of
Transportation (WSDOT), both of the existing intersections on either side of the new bridge will be
reconstructed. The west side intersection will be receiving a new signal system, with lighting,
standards, detection and pre-detection loops and pedestrian improvements. The east side will be
reconfigured as a roundabout, with new lighting, sidewalks and other improvements.
The new improvements will require private utility infrastructure relocations. In discussions with the
utilities, PSE discussed the possibility of having the City opt for a Schedule 74 Conversion with them.
This would underground all overhead utilities and remove the utility poles out of the intersections.
ATTACHMENTS: l. Council Summary; 2. Exhibit West Side; 3. Exhibit East Side; 4. Design Cost
Estimate.
FISCAL IMPACTS (Include Budgeted Amount): Total cost for completion will be approximately
$60,000 coming from the 2012 Arterial Street Fund.
APPROVALS:
DEPARTMENT DIRECTO : �
CITY ATTORNEY:
FINANCE DIRECTOR:
MAYOR: —
COMMITTEE CHAIR ( �' �OG�
COUNCIL PRESIDENT: CONSENT AGENDA �
GENERAL BUSINESS ❑
� PUBLIC HEARING ❑
RECOMMENDED MOTION: Move to approve proposed Schedule 74 Conversion with Puget
Sound Energy and authorize the Mayor to finalize and execute the Design and Construction
Agreements and other necessary documents related to the Utility Undergrounding.
COIJNCIL ACTION: [17fApprove ❑ Deny .❑ Table ❑ Continue ❑ No Action