Loading...
HomeMy WebLinkAbout4872 Contract Number: 4872 Vendor: Michels Corporation Subject: Construct Cambrian Avenue Sewer Repair Department: Engineering File Class: LEG 12-1 Begin Date: 1/4/2010 End Date: 7/27/2010 Review Date: Vault Date: 1/1/2012 Comments: ACCEPTANCE OF COMPENSATION & RELEASE OF ALL CLAIMS Cambriau Avenue Sewer Repair Project No. 5076 — City Contract No. 4872 Michels Corporation hereby indicates agreement with, and acceptance of, the final Progress Payment and total Contract Price of $91,531.34, including Washington State sales and/or use taxes, and the fuial Coritract Time of 30 calendar days, as full and final compensation for all Work performed in connection with Contract Number No. 4872, and does hereby release the City of Bremerton from all claims, liability, demands, damages and actions of any kind whatsoever, arising from perforn�ance of that Contract. Michels Corporation By: ��� Date: '� � ��— Title: �5/� �C� � Certificate of Notarv Subscribed and sworn to before me this pL�' day of �J ,�� � oFFlCU�� `t't G�l� SHAWNA IIA THORNTON NOTARY PUBUC-0REOON , COMMISSION NO. 436182 MYCOMMISSION p(PIRES FEBRUARY S, 2013 AFFIDAVIT OF PUBLICATION Account #42742 AD#263245 STATE OF WASHINGTON COUNTY OF KITSAP I, Tara L. Stieber, being first duly swom on oath, deposes and says: That she is now, and at all times embraced in the publication herein mentioned was the principal clerk of the printers and publishers of KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court ' of the County of Kitsap, in which County it is published and is now and has been for more than six months prior to the date of the publication hereinafter refened to, published in the English language continually as a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County, Washington and is now and during all of said time, was printed in an o�ce maintained in the aforesaid place of publication of said newspaper; that the following is a true text of an advertisement as it was published in regular issues (and not in supplement form) of said newspaper on the following date, to wit: , And on July 23, 2010 such newspaper was regularly distributed to its subscribers during all of said period. The full amount of the fee charged for the foregoing publication is the sum of $39.86. This amount has not been paid in full. (Signature of Principal Clerk) Subscribed and swom to before me this day of August 6, 2010. `0' yg9t0l66B�� B � �° ����1 j'' �R � , sm"�°• A °°,•. "� �' � �9 � v � o ,��� o� , ; �+ ,� n ,� 6 Qa e°o�0 AV O�• � Notary Public in and for the State of Washington, Kitsap County. ;: �\� ,�� o'�� , ` - U � �$�, $ ��� o� � o ° � ; a � NOTICE OF COMPLETION ,'', ��sA��E t1 O¢����� ',`, Notice of Completion has been issued to Michels Corporation for City Project No. 5076, City Contract No. 4872 for the Cambrian Avenue Sewer Repairs. Any parties having a claim for material, labor or damages related to this Contract have forty five (45) days from the date of first publication of this notice to file a claim. Carol Etgen City Clerk 345 6th Street Bremerton, Washington 98337 July 23, 2010 ...............................Ad#20103379 Washington State �� ('����:�<<��' ���� ��� Department of Revenue ��/��"��� PO Box 47474 Olympia, WA 98504-7474 � 601 061 071 � Certificate of Payment of State Excise ` Taxes by Public Works Contractor MICHELS CORPORATION CITY OF BREMERTON PUBLIC�WORKS PO BOX 128 � GUNNAR FRIDRIK5SON • BROWNSVILLE WI 53006 0128 3027 OLYMPUS DR BREMERTON WA 98310 4799 We hereby certify that taxes, increases and penalties due or to become due from the above-named �, contractor under Chapter 180, Laws of 1935, as amended, with respect to the following public works contract: , . CITY OF BREMERTON PUBLIC WORKS , 4872, CAMBRIAN AVE SEWER REPAIR together with all other taxes, increases and penalties due from such contractor, have been paid in full or that they are, in the Department's opinion, readily collectible without recourse to the state's lien on the retained percentage. This certificate is issued pursuant to the provision of Chapter 60.28 Revised Code of WashingXon for the sole purpose of infornung the state, county, or municipal officer charged with the duty of disbursing or authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases the state's lien on the retained percentage provided by this Chapter for excise taxes due from� said contractor. This certificate does not release said contractor from liability for additional t� that may be later determined to be due with respect to the above-mentioned contract or other activities. , Dated ���5� C� at Olympia, Washington, � State of Washington Department of Revenue � ; � �+'n� ��� Certifying Officer For tax assistance, visit dor.wa.gov or call 1-800-647-7706. To inquire about the availability of this document in an altemate format for the visually impaired , please call (360) 705-6715. Teletype (TTY) users may call 1-800-451-7985. — , REV 31 0028 (10-01-02) � � � � � �� � �, � E � � SEP 0 3 2Q10 . � . ` � �� .�R�l��_�;�;�"` A" : .' �, � _� E STATF ,�`� U�, � O� � � �n L • � W� Y 2 C yy � ;sev F STATE OF WASHINGTON DEPARTMENT OF LABOR AND INDUSTRIES � CITY OF BREMERTUN � � � � � �"� � � ATTN: GUNNAR FRIDRIKSSON ��� o � 2Q �� 3027 OLYMPUS DRIVE BREMERTON WA 98310 ��S�I����R�N� �i'vE�iO� Certificate of Release of the State's Lien on Public Works Contracts With this letter, the Washington State Department of Labor & Industries approves of your release or payment of the contract amount retained from the following contractor --- MICHELS CORPORATION 832,318-00 601 061 071 1715 16TH ST SE SALEM OR 97302 --- related to the following public works contract: CAMBRIAN AVENUE SEWER REPAIR 5076 In our opinion, all workers' compensation insurance premiums, increases, and penalties due to L&I from this contractor have been paid in full or are readily collectible without recourse to the state's lien on the retained percentage.** This letter's sole purpose is to communicate our release of the state's lien to the public official responsible for paying or authorizing the pal�ment of �ublic fe�.^.ds to the contractor named above. If we later determine that the contractor owes additional premiums related to the above-mentioned contract or other activities, the contractor is still liable for payment. Dated November 1, 2010 at Olympia, Washington. State of Washington Departm nt of Lab � Industries � Contract Release Specialist WENDY MCCLEARY - 360-902-5772 or MCWE235u1LNI.WA.GOV ** Title 51 RCW authorizes L8�I to collect workers' compensation insurance premiums, increases, and penalties. Chapter 60.28 RCW establishes L&I's priority regarding this lien. � Employment Security Depa�tment -� WASHII�iGTON SiATE CONTRACTOR: MICHELS CORP � ) CERTIFICATE OF PO BOX 128 ) PAYMENT OF CONTRIBIlTIONS BROWNSVILtE, WI 53006 ) PENALTIES AND INTEREST ON ) PUBLIC WORKS CONTRACT � ES Reference No. 657299-00 5 TO: CITY OF BREMERTON 3027 OLYMPIJS DR BREMERTON, WA 98310 The Empioyment Security Department hereby certifies those contributions, penalties and interest due from the above named contractor under the Employment Security Act have been paid in full or provided for with respect to the following public works contract: 4872 The Employment Security Department hereby certifies that it has no claim pursuant to ' RCW 50.24.130 against the public body named above for tax attributable to service performed for said pubiic body by the above named contractor on the above described convac� The Employment Security Department releases its lien on the retained percentage, which is provided by RCW 60.28.040 for contributions, penalties and interest due from said contractor. This certificate does not release said contractor from liability for additional contribudons, penalties and interest which may be later determined to be due with respect to the above mentioned contract. Dated at Olympia, Washington on August 4, 2010. COMMISSIONER EMPLOYMENT SECIlRITY DEPARTMENT . B (Authorized Represe dve) . Ortginal—Disbursing Officer Duplicate—Employer � � � � � � � � � Triplicate—Central Office Files 2010 , s AUG 0 9 '� EMS 8449 760 R3-98 ; i ,. ; i ' �C<<:�!����i:i�''e r y L�� ��� ..-� ! 4 � , •-- Contract Number: 4872 Vendor: MICHELS CORPORATION Subject: Construct Cambrian Avenue Sewer Repair Department: Engineering File Class: LEG 12 -1 Begin Date: 1/4/2010 End Date: 3/31/2010 Review Date: 5/1/2010 Vault Date: 1/1/2012 Comments: Change Order #1 -3/10 - Notice of Completion 7 -23 -2010 ., , AFFIDAVIT OF PUBLICATION Account #42742 AD#263245 � STATE OF WASHINGTON � COUNTY OF KITSAP I, Tara L. Stieber, being first duly sworn on oath, deposes and says: That she is now, and at all times embraced in the publication herein mentioned was the principal clerk of the printers and publishers of KITSAP SLTN; that said newspaper has been approved as a legal newspaper by order of the Superior Court of the County of Kitsap, in which County it is published and is now and has been for more than six months prior to the date of the publication hereinafter referred to, published in the English language continually as a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County, Washington and is now and during all of said time, was printed in an office maintained in the aforesaid place of publication of said newspaper; that the following is a true text of an advertisement as it was published in regular issues (and not in supplement form) of said newspaper on the following date; to wit: � And on July 23, 2010 such newspaper was regularly distributed to its subscribers during all of said period. The full amount of the fee charged for the foregoing publication is the sum of $39.86. This amount has not been paid in full. (Signature of Principal Clerk) Subscribed and sworn to before me this day of August 6, 2010. � ���������� �� � . ���� � ,� � _�. � �1 • • � `V � Notary Public in and for the State of Washington, Kitsap County. ;s� • �J ' �V �� ,, . `J . . . . , ����''��SrATE ��•'��``, NOTICE OF COMPLETION ���,����,,,,,,. Notice of Completion has been issued to Michels Corporation for City Project No. 5076, City Contract No. 4872 for the Cambrian Avenue Sewer Repairs. Any parties having a claim for material, labor or damages related to this Contract have forty five (45) days from the date of first publication of this notice to file a claim. Carol Etgen City Clerk 345 6th Street Bremerton, Washington 98337 July 23, 2010 ...............................Ad#20103379 4° Contract Numbe�: 4872 Vendor: MICHELS CORPORATION Subject: . Construct Cambrian Avenue Sewer Repair Department: Engineering File Class: LEG 12-1 Begin Date: Ol/04/2010 End Date: 03/31/2010 Review Date: 05/01/2010 Vault Date: Comments: Change Order #1-3/10 �I I � i � � CITY OF BREMERTON � _ . CHANGE ORDER CONTRACT CHANGE ORDER NO: 'I PROJECT NAME: Cambrian Avenue Sewer Repair PROJECT NO: 5076 CONTRACTOR: Michels Corporation ORIGINAL CONTRACT AMOUNT: $72,803.27 DAYS: 30 PREVIOUSLY APPROVED CHANGES: y $0 DAYS: 0 THIS CHANGE: $18,728.07 DAYS: 0 REVISED CONTRACT AMOUNT: $91,531.34 DAYS: 30 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT o � CONTRACT CONTRACT TIME � � AMOUNT AMOUNT EXTENSION � � ($) � ($) (DAYS:) � � � � In completing contract negotiations with the Contractor, two issues were raised: • The main between 13"' Street to 11"' Street was identified as 12-inch concrete pipe. It is in actuality 15-inch concrete pipe, requiring a larger liner size to be utilized over the 630 feet of length. • The documents identify the City as the responsible party for cleaning and videoing the � main before the liner installation. As the lining success is dependent on this work, responsibility snould 'oe ihe Co���iact�r's �or ensuri�r� th2' cleaning meets the liner requirements. To resolve these issues, a proposal was requested from the Contractor. Costs associated with the revisions appear appropriate and reasonable and therefore are to $18,728.07 be included into the project. Cost includes Washington State Sales Tax. NET CHANGE IN CONTRACT AMOUNT $18,728.07 0 � INCREASE OR (DECREASE) Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past pertormance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contra�t price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. I CONTRACT CHANGE ORDER NO: � PROJECT NAME: Cambrian Avenue Sewer Repair This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. RECOMMENDED: ��� � 3 �` (� PRO ECT ENGINEER ate �' i��;,�-- �� y � ,,,,,, ,,,,N,,,,,,, , RECOMMENDED: � ��. � . CITY ENGINEER / DIRECTOR OF PUBLIC WORKS ����-�`'' �� ''•••.!L��'�, ;� �:'�� � � : � v � � � � :°= ACCEPTED: - . CONT C O , �t �y ,: �� � : °�, u�"•-.o� .�' 'f, 1�. ....••�'` ��.� � d �'���`''ya I SJV ��•`. APPROVED: "�1,,,,,,►S"`�'` MAYOR Date APP FOR • ATTEST: � /. , ' Attorney y Cler Page 2 of 2 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: 4872 MICHELS CORPORATION Construct Cambrian Avenue Sewer Repair Engineering LEG 12-1 O1/04/2010 03/31/2010 03/O1/2010 Comments : � PUBLIC WORKS AGREEMENT THIS AGREEMENT, is entered into between the City of Bremerton, a Washington Municipal Corporation ("City"), and Michels Corporation ("Contractor"), whose mailing address is 1715 16 Street, Salem, Oregon 97302. The parties agree as follows: 1. CONTRACTOR SERVICES. The Contractor shall perform construction services, in accordance with generally accepted standards and at the direction of the Public Works Director (Director) for the following project: Provide labor, equipment, and materials necessary to perform repairs of sanitary lines from 13 Street on Cambrian Avenue south to ll Street, then diagonally across ll to Mead Avenue easterly from there to Wycoff Avenue. A detailed description of services is included herein as Attachment 1. The Work shall conform to the 2008 Standard Specifications for Road, Bridge, and Municipal Construction and the Technical Specifications included herein as Attachment 2. All work shall be performed under the control of the Director as provided in Section 1-OS CONTROL OF WORK of the 2008 Standard Specifications for Road, Bridge and Municipal Construction. 2. TIME OF COMPLETION. The Contract time shall be divided into two phases. Phase I, Procurement, shall be 30 calendar days and shall begin on the date of Notice to Proceed. Phase II, Construction, shall be 30 calendar days and shall begin upon receipt of a second Notice to Proceed from the City. Issuance of the second Notice to Proceed is dependant on consultation between the City and the Contractor. 3. COMPENSATION. The City shall pay the Contractor the total amount of $67,038.00 plus applicable Washington State Retail Sales Tax. The Contractor shall invoice the City monthly. The City will pay for the portion of the work described in the invoice that has been completed by the Contractor and approved by the City. The City payment shall not constitute a waiver of the City's right to final inspection and acceptance of the project. A. Performance Bond. Pursuant to Chapter 39.08 RCW, the Contractor, shall provide the City a performance bond for the full contract amount to be in effect until sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor and Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Retaina�e. The City shall hold back a retainage in the amount of five percent (5%) of any and all payments made to contractor for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State 0 PUBLIC WORKS AGREEMENT — Page 1 of 9 (December 14, 2009) (between City of Bremerton and Michels Corporation) Department of Labor & Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. C. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to \ deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. D. Final Pavment: Waiver of Claims. THE ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS MADE. 4. INDEPENDENT CON'�'RACTOR. Contractor is and shall be at all times acting as an independent contractor and not as an employee of the City. The Contractor shall secure at its expense, and shall be responsible for all payments of income tax, social security, state industrial insurance compensation, unemployment compensation, and all other payroll deductions for the Contractor, officer, agents, employees and sub-contractors. The Contractor shall also secure all applicable business licenses, if required, in connection with the contract services, including all required licenses for Contractor's officers, agents, employees and sub- contractors. 5. TERMINATION. The City may terminate this agreement without notice for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's failure to supply sufficient skilled workers or suitable materials or equipment. B. The Contractor's failure to prosecute the work with such diligence as will ensure its physical completion within the original physical completion time specified in this Agreement and any extensions of time which may have been granted to the Contractor by change order or otherwise. PUBLIC WORKS AGREEMENT — Page 2 of 9 (December 14, 2009) (between City of Bremerton and Michels Corporation) C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor disregards the authority of the City. G. The Contractor performs work which deviates from the Contract, and neglects or refuses to correct rejected work. H. The Contractor's failure to provide continuous competent supervision. I. The Contractor otherwise violates in any material way any provisions or requirements of the contract. If the City terminates this agreement for good cause, the Contractor shall not receive any monies due under this agreement, if any, until the Contract work is completed. 6. PREVAILING WAGES. Contractor shall file a"Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay Kitsap County prevailing wages and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. 7. CHANGES. The City may issue a written or oral work change directive for any change in the Contract work during the performance of this agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the City's project manager within two (2) business days of the date the Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written or oral work change directive from the City or a change order from the City. If the Contractor fails to request a change order within the time allowed, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided below: PUBLIC WORKS AGREEMENT — Page 3 of 9 (December 14, 2009) (between City of Bremerton and Michels Corporation) A. Procedure and Protest bv the Contractor. If the Contractor disagrees with anything required by a written work change directive, oral work change directive or change order, including any direction, instruction, interpretation, or determination by the City, the Contractor shall: 1. Give a signed written notice of protest to the City within one business day; 2. Supplement the written protest within five (5) calendar days with a written statement that provides the following information: a. b. c. d. e. The date of the Contract's protest. The nature and circumstances that caused the protest. The provisions in this agreement that support the protest. The estimated dollar cost, if any, of the protested work and how that estimate was determined. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. The Contractor shall keep complete records of extra costs and time incurred as a result of the protested work. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all protests, provided the procedures in this section are followed. If the City determines that a protest is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. B. Contractor's Duty to Complete Protested Work. In spite of any protest, the Contractor shall proceed promptly with the work as the City has ordered. C. Contractor's Acceptance of Chan es. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). PUBLIC WORKS AGREEMENT — Page 4 of 9 (December 14, 2009) (between Ciry of Bremerton and Michels Corporation) E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). 8. CLAIMS. The Contractor shall give written notice to the City of all claims other than change orders within fourteen (14) calendar days of the occurrence of the events giving rise to the claims. Any claim for damages, additional payment for any reason, or extension of time, whether under this agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this agreement; or, if (and only i� no such provision is applicable, unless that claim is set forth in detail in writing and received by the City within seven (7) calendar days from the date Contractor knew, or should have known, of the facts giving rise to the claim. At a minimum, a Contractor's written claim must include the information set forth regarding protests in Section 7.A.2.a.-e. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. Contractor must, in any event, file any claim or bring any suit arising from or connected with this agreement within 120 calendar days from the date the contract work is complete. 9. WARRANTY. The Contractor shall correct all defects in workmanship and materials within one year from the date of the Contractor's acceptance of the City's final payment under this contract. When defects are corrected, the warranty for that portion of the work shall extend for one year form the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. 10. INI2EMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits including all legal costs and attorney fees, arising out of or in connection with the performance of this agreement, except for injuries and damages solely caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and PUBLIC WORKS AGREEMENT — Page 5 of 9 (December 14, 2009) (between Ciry of Bremerton and Michels Corporation) the City, its officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS 1NDEMNIFICATION CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL 1NSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF THIS INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this agreement. 11. INSURANCE. The Contractor shall procure and maintain for the duration of this agreement, insurance against claims for injuries to persons or damage to property that may arise from or in connection with the performance of the Contract work by the Contractor, its agents, representatives, employees or subcontractors. Before beginning the work on the project described in this agreement, the Contractor shall provide a Certificate of Insurance evidencing: A. Automobile Liabilitv insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and B. Commercial General Liabilitv insurance written on an occurrence basis with limits no less than $2,000,000 combined single limit per occurrence and $2,000,000 aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCU) if applicable; and employer's liability. Any payment of deductible or self insured retention shall be the sole responsibility of the Contractor. The City reserves the right to receive a certified copy of all the required insurance policies. The City, its officials, employees, agents and volunteers shall be named as an additional insured on the insurance policy, as respects work performed by or on behalf of the Contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The Contractor's insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. PUBLIC WORKS AGREEMENT — Page 6 of 9 (December 14, 2009) (between City of Bremerton and Michels Corporation) The Contractor's insurance shall be primary insurance as respects the City, and the City shall be given thirty (30) calendar days prior written notice by certified mail, return receipt requested, of any cancellation, suspension or material change in coverage. If this contract requires work to be performed in or on navigable waters, the Contractor shall provide insurance written on an occurrence basis with limits no less than $2,000,000 combined single limit per occurrence and $2,000,000 aggregate for claims made under the Longshoreman and Harbor Workers Act and the Jones Act. > 12. MISCELLANEOUS. A. Nondiscrimination. In the hiring of employees for the performance of work under this Agreement or any sub-contract hereunder, the Contractor, its sub-contractors, or any person acting on behalf of such Contractor or sub-contractor shall not, by reason of race, religion, color, sex, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. B. Compliance with Laws. Contractor shall comply with all federal, state and local laws, rules and regulations throughout every aspect in the performance of this agreement. C. Work Performed at Contractor's Risk. Contractor shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of this agreement. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any, loss of or damage to materials, tools, or other articles used or held for use in connection with the work. D. Nonwaiver of Breach. The failure of the City to insist upon strict performance of any of the terms and rights contained herein, or to exercise any option herein conferred in one or more instances, shall not be construed to be a waiver or relinquishment of those terms and rights and they shall remain in full force and effect E. Governing Law. This agreement shall be governed and construed in accordance with the laws of the State of Washington. If any dispute arises between the City and Contractor under any of the provisions of this agreement, resolution of that dispute shall be available only through the jurisdiction, venue and rules of the Kitsap County Superior Court, Kitsap County, Washington. F. Attornev's Fees. To the extent not inconsistent with RCW 39.04.240, in any claim or lawsuit for damages arising from the parties' performance of this agreement, each party shall be responsible for payment of its own PUBLIC WORKS AGREEMENT — Page 7 of 9 (December 14, 2009) (between Ciry of Bremerton and Michels Corporation) legal costs and attorney's fees incurred in defending ar bringing such claim or lawsuit; however, nothing in this subsection shall limit the City's right to indemnification under Section 10 of this agreement. G. Written Notice. All communications regarding this agreement shall be sent to the parties at the addresses listed on the signature page of this agreement, unless otherwise notified. Any written notice shall become effective upon delivery, but in any event three (3) calendar days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated on this agreement. H. Assi�. Any assignment of this agreement by the Contractor without the written consent of the City shall be void. I. Modification. No waiver, alteration, or modification of any of the provisions of this agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. J. Severabilitv. If any one or more sections, sub-sections, or sentences of this agreement are held to be unconstitutional or invalid, that decision shall not affect the validity of the remaining portion of this agreement and the remainder shall remain in full force and effect. K. Entire A�reement. The written provisions and terms of this agreement, together with any attached Exhibits, supersede all prior verbal statements by any representative of the City, and those statements shall not be construed as forming a part of or altering in any manner this agreement. This agreement and any attached Exhibits contain the entire agreement between the parties. Should any language in any Exhibit to this agreement conflict with any language contained in this agreement, the terms of this agreement shall prevail. PUBLIC WORKS AGREEMENT — Page 8 of 9 (December 14, 2009) (between Ciry of Bremerton and Michels Corporation) IN WITNESS WHEREOF, the parties below have executed this agreement. CONTRACTOR `````�� �� �� � i i i i i r►ii,,�� � :•• • •.!�� ��1 e: K�ll � � � � � ����� v� 'Z: ^� 2�:� =., 3 �.��`�.,� l Z{?1,�c� ?� ' ''���''�> • ���?.L`d�� •`��``• ''���,,,,,,,,,�0���`11�otices to be sent to: CONTRACTOR: Michels Corporation 1715 16'" Street Salem, Oregon 97302 (503) 364-1199 (503) 391-8317 (facsimile) R:\LEGAL\Contracts\FORM S\ShortForm. P W.Agr.doc THE CITY OF BREMERTON � �Z Print Name: � L.E� -- Title: DATE /�� / / Notices to be sent to: CITY OF BREMERTON: City Clerk 345 6` Street, 6 Floor Bremerton, WA 98337 (360) 473-5323 (360) 473-5200 (facsimile) APPROVED AS TO FORM: PUBLIC WORKS AGREEMENT — Page 9 of 9 (December 14, 2009) (between Ciry of Bremerton and Michels Corporation) � rv , � Bremerto City Clerk PREVAILING WAGES State of Washington DEPARTMENT OF LABOR AND INDUSTRIES Prevailing Wage Section - Telephone (360) 902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage Rates For Public Works Contracts The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, workers' wage and benefit rates must add to not less than this totat. A brief description of overtime calculation requirements is provided on the Benefit Code Key. KITSAP COUNTY Effective 08-31-07 **************��********************�***********************,�**�**************************�*************** (See Benefit Code Key) Over ` PREVAILING Time Hohday Note Classification WAGE Code Code Code ASBESTOS ABATEMENT WORKERS JOURNEYLEVEL BOILERMAKERS JOURNEYLEVEL BRICK AND MARBLE MASONS JOURNEYLEVEL CABINET MAKERS (IN SHOP) JOURNEYLEVEL CARPENTERS ACOUSTICAL WORKER BRIDGE, DOCK AND WARF CARPENTERS CARPENTER CREOSOTED MATERIAL DRYWALL APPLICATOR FLOOR FINISHER FLOOR LAYER FLOOR SANDER MILLWRIGHT AND MACHINE ERECTORS PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING SAWFILER SHINGLER STATIONARY POWER SAW OPERATOR STATIONARY WOODWORKING TOOLS CEMENT MASONS JOURNEYLEVEL DIVERS 8� TENDERS DIVER DIVER TENDER DREDGE WORKERS ASSISTANT ENGINEER ASSISTANT MATE (DECKHAND) BOATMEN ENGINEER WELDER LEVERMAN, HYDRAULIC MAINTENANCE MATES OILER DRYWALL TAPERS JOURNEYLEVEL ELECTRICAL FIXTURE MAINTENANCE WORKERS JOURNEYLEVEL $36.24 1 H $30.34 1 $43.75 1 M $12.53 1 $43.91 $43.75 $43.75 $43.85 $43.79 $43.75 $43.75 $43.75 $44.75 $43.95 $43.75 $43.75 $43.75 $43.75 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M 1M $44.58 1 M $85.75 1 M $44.22 1 M $44.59 $44.08 $44.59 $44.64 $46.21 $44.08 $44.59 $44.21 1T 1T 1T 1T 1T 1T 1T 1T 5D 5A 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 8A 5D 5D 5D 5D 5D 5D 5D 5D $43.59 1 E 5P $9.37 1 8L 8L 8L 8L 8L 8L 8L 8L Page 1 KITSAP COUNTY Effective 08-31-07 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code ELECTRICIANS - INSIDE CABLE SPLICER CABLE SPLICER (TUNNEL) CERTIFIED WELDER CERTIFIED WELDER (TUNNEL) CONSTRUCTION STOCK PERSON JOURNEYLEVEL JOURNEYLEVEL(TUNNEL) ELECTRICIANS - MOTOR SHOP CRAFTSMAN � JOURNEY�EVEL ELECTRICIANS - POWERLINE CONSTRUCTION CABLE SPLICER CERTIFIED LINE WELDER GROUNDPERSON HEAD GROUNDPERSON HEAVY LINE EQUIPMENT OPERATOR JACKHAMMER OPERATOR JOURNEY LEVEL LINEPERSON LINE EQUIPMENT OPERATOR POLE SPRAYER POWDERPERSON ELECTRONIC TECHNICIANS ELECTRONIC TECHNICIANS JOURNEY LEVEL ELEVATOR CONSTRUCTORS MECHANIC MECHANIC IN CHARGE FABRICATED PRECAST CONCRETE PRODUCTS ALL CLASSIFICATIONS FENCE ERECTORS FENCE ERECTOR FENCELABORER FLAGGERS JOURNEYLEVEL GLAZIERS JOURNEYLEVEL HEAT 8� FROST INSULATORS AND ASBESTOS WORKERS MECHANIC HEATING EQUIPMENT MECHANICS MECHANIC HOD CARRIERS & MASON TENDERS JOURNEYLEVEL INDUSTRIAL ENGINE AND MACHINE MECHANICS MECHANIC INDUSTRIAL POWER VACUUM CLEANER JOURNEYLEVEL INLAND BOATMEN CAPTAIN COOK DECKHAND ENGINEER/DECKHAND MATE,LAUNCH OPERATOR $55.05 $58.86 $53.16 $57.15 $27.32 $51.25 $55.05 $15.37 $14.69 $54.37 $49.64 $35.93 $37.89 $49.64 $37.89 $49.64 $42.27 $49.64 $37.89 $40.08 $57.88 $63.45 $13.50 $13.80 $11.60 $31.01 $43.76 $46.13 $18.45 $36.75 $15.65 $9.10 1D 1D 1D 1D 1D 1D 1D 5A 5A 5A 5A 5A 5A 5A 2A 6C 2A 6C 4A 4A 4A 4A 4A 4A 4A 4A 4A 4A 5A 5A 5A 5A 5A 5A 5A 5A 5A 5A il!7 5A 4A 6Q 4A 6Q 1 1 1 1H 5D 1H 5G 1 S 5J 1 1H 5D 1 1 $38.04 1 K 56 $31.90 1 K 5B $31.59 1 K 56 $34.37 1 K 56 $36.02 ' 1 K 56 Page 2 KITSAP COUNTY Effective 08-31-07 *,�*************�***************************�************�*******************************�*�*************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code INSPECTION/CLEANING/SEALING OF SEWER & WATER SYSTEMS BY REMOTE CONTROL CLEANER OPERATOR,FOAMER OPERATOR GROUT TRUCK OPERATOR HEAD OPERATOR TECHNICIAN N TRUCK OPERATOR INSULATION APPLICATORS JOURNEYLEVEL IRONWORKERS JOURNEYLEVEL LABORERS ASPHALT RAKER BALLAST REGULATOR MACHINE BATCH WEIGHMAN BRUSH CUTTER BRUSH HOG FEEDER BURNERS CARPENTER TENDER CASSION WORKER CEMENT DUMPER/PAVING CEMENT FINISHER TENDER CHANGE-HOUSE MAN OR DRY SHACKMAN CHIPPING GUN (OVER 30 LBS) CHIPPING GUN (UNDER 30 LBS) CHOKER SETTER CHUCK TENDER CLEAN-UP LABORER CONCRETE DUMPER/CHUTE OPERATOR CONCRETE FORM STRIPPER CONCRETE SAW OPERATOR CRUSHER FEEDER CURING LABORER DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED MATERIALS) DITCH DIGGER DIVER DRILL OPERATOR (HYDRAULIC, DiAMOND) DRILL OPERATOR, AIRTRAC DUMPMAN EPDXY TECHNICIAN EROSION CONTROL WORKER FALLER/BUCKER, CHAIN SAW FINAL DETAIL CLEANUP (i.e., dusting, vacuuming, window cleaning, NOT construction debris cleanup) FINE GRADERS FIRE WATCH FORM SETTER GABION BASKET BUILDER GENERALLABORER GRADE CHECKER & TRANSIT PERSON GRINDERS GROUT MACHINE TENDER $9.73 � $11.48 1 $12.78 1 $7.93 1 $24.17 1 $43.75 1 M $47.92 1 O $36.75 $36.24 $31.01 $36.24 $36.24 $36.24 $36.24 $37.20 $36.75 $36.24 $36.24 $36.75 $36.24 $36.24 $36.24 $36.24 $36.75 $36.24 $36.75 $31.01 $36.24 $36.24 $36.24 $37.20 $36.75 $37.20 $36.24 $36.24 $36.24 $36.75 $28.45 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H $36.24 $31.01 $36.24 $36.24 $36.24 $36.75 $36.24 $36.24 1H 1H 1H 1H 1H 1H 1H 1H 5D 5A 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D Page 3 KITSAP COUNTY Effective 08-31-07 ********************************************************************************************************** • (See Benefit Code Key) • Over PREVAILING Time Holiday Note Classification WAGE Code Code Code GUARDRAIL ERECTOR HAZARDOUS WASTE WORKER LEVEL A HAZARDOUS WASTE WORKER LEVEL B HAZARDOUS WASTE WORKER LEVEL C HIGH SCALER HOD CARRIER/MORTARMAN JACKHAMMER LASER BEAM OPERATOR MANHOLE BUILDER-MUDMAN MATERIAL YARDMAN MINER NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST, GUNITE, SHOTCRETE, WATER BLASTER PAVEMENT BREAKER PILOT CAR PIPE POT TENDER PIPE RELINER (NOT INSERT TYPE) PIPELAYER & CAULKER PIPELAYER & CAULKER (LEAD) PIPEWRAPPER POT TENDER POWDERMAN POWDERMAN HELPER POWERJACKS RAILROAD SPIKE PULLER (POWER) RE-TIMBERMAN RIPRAP MAN RODDER SCAFFOLD ERECTOR SCALE PERSON SIGNALMAN SLOPER (OVER 20") SLOPER SPRAYMAN SPREADER (CLARY POWER OR SIMILAR TYPES) SPREADER(CONCRETE) STAKE HOPPER STOCKPILER TAMPER & SIMILAR ELECTRIC, AIR & GAS TAMPER (MULTIPLE & SELF PROPELLED) TOOLROOM MAN (AT JOB SITE) TOPPER-TAILER TRACKLABORER TRACK LINER (POWER) TRUCK SPOTTER TUGGER OPERATOR VIBRATING SCREED (AIR, GAS, OR ELECTRIC) VIBRATOR VINYL SEAMER WELDER WELL-POINT LABORER $36.24 $37.20 $36.75 $36.24 $37.20 $36.75 $36.75 $36.75 $36.75 $36.24 $37.20 $36.75 $36.75 $31.01 $36.75 $36.75 $36.75 $37.20 $36.75 $36.24 $37.20 $36.24 $36.75 $36.75 $37.20 $36.24 $36.75 $36.24 $36.24 $36.24 $36.75 $36.24 $36.75 $36.75 $36.24 $36.24 $36.75 $36.75 $36.24 $36.24 $36.24 $36.75 $3624 $36.75 $36.24 $36.75 $3624 $36.24 $36.75 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H iH 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D Page 4 KITSAP COUNTY Effective 08-31-07 ********���***************************�*************�************�*�****************�********************� (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code LABORERS - UNDERGROUND SEWER 8� WATER GENERALLABORER PIPE LAYER LANDSCAPE CONSTRUCTION IRRIGATION OR LAWN SPRINKLER INSTALLERS LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS LANDSCAPING OR PLANTING LABORERS LATHERS JOURNEYLEVEL METAL FABRICATION (IN SHOP) FITTER LABORER MACHINE OPERATOR WELDER MODULAR BUILDINGS CABINET ASSEMBLY ELECTRICIAN EQUIPMENT MAINTENANCE PLUMBER PRODUCTION WORKER TOOL MAINTENANCE UTILITY PERSON WELDER PAINTERS JOURNEYLEVEL PLASTERERS JOURNEYLEVEL PLAYGROUND & PARK EQUIPMENT INSTALLERS JOURNEYLEVEL PLUMBERS & PIPEFITTERS JOURNEYLEVEL POWER EQUIPMENT OPERATORS ASSISTANT ENGINEERS BACKHOE, EXCAVATOR, SHOVEL (3 YD & UNDER) BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YD & UNDER 6 YD) BACKHOE, EXCAVATOR, SHOVEL (6 YD AND OVER WITH ATTACHMENTS) BACKHOES, (75 HP & UNDER) BACKHOES, (OVER 75 HP) BARRIER MACHINE (ZIPPER) BATCH PLANT OPERATOR,CONCRETE BELT LOADERS (ELEVATING TYPE ) BOBCAT (SKID STEER) BROOMS BUMP CUTTER CABLEWAYS CHIPPER COMPRESSORS CONCRETE FINISH MACHINE - LASER SCREED CONCRETE PUMPS CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT CONVEYORS CRANES, THRU 19 TONS, WITH ATTACHMENTS $36.24 1 H 5D $36.75 1 H 5D $9.25 1 $10.05 1 $12.92 1 $43.79 1M � $26.96 $7.93 $13.83 $13.83 $11.56 $11.56 $11.56 $11.56 $9.26 $11.56 $11.56 $11.56 $33.16 26 $43.10 1 R $8.54 1 $50.22 1 G 1 1 1 1 1 1 1 1 $42.14 $44.92 $45.41 $45.96 $44.50 $44.92 $44.92 $44.92 $44.50 $42.14 $42.14 $44.92 $45.41 $44.92 $42.14 $42.14 $44.50 $44.92 $44.50 $44.50 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 5A 56 5A 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L Page 5 KITSAP COUNTY Effective 08-31-07 ******�*�****************�********************��********************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code CRANES, 20 - 44 TONS, WITH ATTACHMENTS CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATACHMENTS) CRANES, 100 TONS - 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) CRANES, A-FRAME, 10 TON AND UNDER CRANES, A-FRAME, OVER 10 TON CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH ATTACHMENTS CRANES, OVERHEAD, BRIDGE TYPE ( 20 - 44 TONS) CRANES, OVERHEAD, BRIDGE TYPE ( 45 - 99 TONS) CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM CRUSHERS DECK ENGINEER/DECK WINCHES (POWER) DERRICK, BUILDING DOZERS, D-9 & UNDER DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT DRILLING MACHINE ELEVATOR AND MANLIFT, PERMANENT AND SHAFT-TYPE EQUIPMENT SERVICE ENGINEER (OILER) FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP FORK LIFTS, (3000 LBS AND OVER) FORK LIFTS, (UNDER 3000 LBS) GRADE ENGINEER GRADECHECKER AND STAKEMAN GUARDRAIL PUNCH HOISTS, OUTSIDE (ELEVATORS AND MANLIFTS), AIR TUGGERS HORIZONTAUDIRECTIONAL DRILL LOCATOR HORIZONTAUDIRECTIONAL DRILL OPERATOR HYDRALIFTS/BOOM TRUCKS (10 TON & UNDER) HYDRALIFTS/BOOM TRUCKS (OVER 10 TON) LOADERS, OVERHEAD (6 YD UP TO 8 YD) LOADERS, OVERHEAD (8 YD & OVER) LOADERS, OVERHEAD (UNDER 6 YD), PLANT FEED LOCOMOTIVES, ALL MECHANICS, ALL MIXERS, ASPHALT PLANT MOTOR PATROL GRADER (FINISHING) MOTOR PATROL GRADER (NON-FINISHING) MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEED�NG OPERATOR PAVEMENT BREAKER PILEDRIVER (OTHER THAN CRANE MOUNT) PLANT OILER (ASPHALT, CRUSHER) POSTHOLE DIGGER, MECHANICAL POWER PLANT PUMPS, WATER QUAD 9, D-10, AND HD-41 $44.92 $45.41 $45.96 $46.53 $42.14 $44.50 $47.09 $44.92 $45.41 $45.96 $45.96 $46.53 $44.92 $44.92 $45.41 $44.50 $44.50 $44.92 $42.14 $44.50 $44.92 $44.50 $42.14 $44.50 $42.14 $44.92 $44.50 $44.50 $44.92 $42.14 $44.50 $45.41 $45.96 $44.92 $44.92 $45.41 $44.92 $44.92 $44.50 $45.41 $42.14 $42.14 $44.92 $44.50 $42.14 $42.14 $42.14 $45.41 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 8L 8L 8L 8L 8L 8L SL 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L Page 6 KITSAP COUNTY Effective 08-31-07 *,��********************,�*�******************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING EQUIP RIGGER AND BELLMAN ROLLAGON ROLLER, OTHER THAN PLANT ROAD MIX ROLLERS, PLANTMIX OR MULTILIFT MATERIALS ROTO-MILL, ROTO-GRINDER SAWS, CONCRETE SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING OFF-ROAD EQUIPMENT ( UNDER 45 YD) SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING OFF-ROAD EQUIPMENT (45 YD AND OVER) SCRAPERS, CONCRETE AND CARRY ALL SCREED MAN SHOTCRETE GUNITE SLIPFORM PAVERS SPREADER, TOPSIDE OPERATOR - BLAW KNOX SUBGRADE TRIMMER TOWER BUCKET ELEVATORS TRACTORS, (75 HP & UNDER ) TRACTORS, (OVER 75 HP) TRANSFER MATERIAL SERVICE MACHINE TRANSPORTERS, ALL TRACK OR TRUCK TYPE TRENCHING MACHINES TRUCK CRANE OILER/DRIVER ( UNDER 100 TON) TRUCK CRANE OILER/DRIVER (100 TON & OVER) TRUCK MOUNT PORTABLE CONVEYER WHEEL TRACTORS, FARMALL TYPE YO YO PAY DOZER POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER (SEE POWER EQUIPMENT OPERATORS) POWER LINE CLEARANCE TREE TRIMMERS JOURNEY LEVELIN CHARGE SPRAY PERSON TREE EQUIPMENT OPERATOR TREE TRIMMER TREE TRIMMER GROUNDPERSON REFRIGERATION & AIR CONDITIONING MECHANICS MECHANIC RESIDENTIAL BRICK & MARBLE MASONS JOURNEYLEVEL RESIDENTIAL CARPENTERS JOURNEYLEVEL RESIDENTIAL CEMENT MASONS JOURNEYLEVEL RESIDENTIAL DRYWALL TAPERS JOURNEYLEVEL RESIDENTIAL ELECTRICIANS JOURNEYLEVEL RESIDENTIAL GLAZIERS JOURNEYLEVEL RESIDENTIAL INSULATION APPLICATORS JOURNEYLEVEL $45.41 $42.14 $45.41 $42.14 $44.50 $44.92 $44.50 $44.92 $45.41 $44.50 $44.92 $42.14 $45.41 $44.92 $44.92 $44.50 $44.50 $44.92 $44.92 $45.41 $44.50 $44.50 $44.92 $44.92 $42.14 $44.92 $35.62 4A $33.82 4A $34.27 4A $31.88 4A $24.03 4A $50.22 1 G $17.04 1 $20.00 1 $30.87 1 $20.00 1 $14.00 1 $28.74 1H $13.96 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 1T 5D 5D 5D 5D 5D 5D 5D 5D � 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5A 5A 5A 5A 5A 5A 5G 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L Page 7 KITSAP COUNTY Effective 08-31-07 ********�*�***************���**�*****************�*******************��************************�***�****** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code RESIDENTIAL LABORERS JOURNEYLEVEL RESIDENTIAL PAINTERS JOURNEYLEVEL RESIDENTIAL PLUMBERS & PIPEFITTERS JOURNEYLEVEL RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) RESIDENTIAL SOFT FLOOR LAYERS JOURNEYLEVEL RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEYLEVEL RESIDENTIAL TERRAZZO/TILE FINISHERS JOURNEYLEVEL ROOFERS JOURNEYLEVEL USING IRRITABLE BITUMINOUS MATERIALS SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) SHIPBUILDING & SHIP REPAIR CARPENTER ELECTRICIAN HEAT & FROSTINSULATOR LABORER MACHINIST OPERATOR PAINTER PIPEFITTER RIGGER SHEET METAL SHIPFITT'ER WELDER/BURNER SIGN MAKERS & INSTALLERS (ELECTRICAL) JOURNEYLEVEL SIGN MAKERS & INSTALLERS (NON-ELECTRICAL) JOURNEYLEVEL SOFT FLOOR LAYERS JOURNEYLEVEL SOLAR CONTROLS FOR WINDOWS JOURNEYLEVEL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEYLEVEL STAGE RIGGING MECHANICS (NON STRUCTURAL) JOURNEYLEVEL SURVEYORS CHAIN PERSON INSTRUMENT PERSON PARTY CHIEF TELECOMMUNICATION TECHNICIANS TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL TELEPHONE LINE CONSTRUCTION - OUTSIDE CABLE SPLICER $10.04 $16.21 $21.11 $33.04 $36.08 $30.51 $30.26 $36.78 $39.78 $51.97 $19.29 $25.53 $46.13 $19.64 $19.29 $19.44 $22.24 $19.29 $19.29 $22.21 $19.29 $19.29 $20.58 $9.27 $36.08 $10.31 $54.24 $13.23 $9.35 $11.40 $13.40 $31.15 $30.66 � 1 1 1E 1B 16 1 1R 1R 1E 16 16 1S 1 16 16 1 1B 16 1 16 1B 1 1 16 16 1X 1 1 1 1 1D 26 6L 5A 5C 5A 5A 6L 6W 6W 5J 6W 6W 6W 6W 6W 6W 5A 50 5C 5A 5A Page 8 b KITSAP COUNTY Effective 08-31-07 **�,�*********************************************�*****************************************************,�** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code HOLE DIGGER/GROUND PERSON $17.19 26 5A INSTALLER (REPAIRER) $2g.41 2B 5A JOURNEY LEVEL TELEPHONE LINEPERSON $28.53 26 5A SPECIAL APPARATUS INSTALLER I $30.66 26 5A SPECIAL APPARATUS INSTALLER II $30.05 28 5A TELEPHONE EQUIPMENT OPERATOR (HEAVY) $30.66 2B 5A TELEPHONE EQUIPMENT OPERATOR (LIGHT) $28.53 26 5A TELEVISION GROUND PERSON $16.31 26 5A TELEVISION LINEPERSON/INSTALLER $21.68 26 5A TELEVISION SYSTEM TECHNICIAN $35.78 26 5A TELEVISION TECHNICIAN $23.19 2B 5A TREE TRIMMER $28.53 2B 5A TERRAZZO WORKERS 8� TILE SETTERS JOURNEYLEVEL TILE, MARBLE 8� TERRAZZO FINISHERS FINISHER TRAFFIC CONTROL STRIPERS JOURNEYLEVEL TRUCK DRIVERS ASPHALT MIX ( TO 16 YARDS) ASPHALT MIX (OVER 16 YARDS) DUMP TRUCK DUMP TRUCK & TRAILER OTHER TRUCKS TRANSIT MIXER WELL DRILLERS & IRRIGATION PUMP INSTALLERS IRRIGATION PUMP INSTALLER OILER WELL DRILLER $41.96 1 B $12.00 1 $36.40 1 K $41.19 1T $41.90 1 T $19.60 1 $19.60 1 $18.37 1 $20.79 1 $13.17 1 $14.08 1 $14.40 1 5A 5A 5D 8L 5D 8L Page 9