HomeMy WebLinkAbout4872 Contract Number: 4872
Vendor: Michels Corporation
Subject: Construct Cambrian Avenue Sewer Repair
Department: Engineering
File Class: LEG 12-1
Begin Date: 1/4/2010
End Date: 7/27/2010
Review Date:
Vault Date: 1/1/2012
Comments:
ACCEPTANCE OF COMPENSATION & RELEASE OF ALL CLAIMS
Cambriau Avenue Sewer Repair
Project No. 5076 — City Contract No. 4872
Michels Corporation hereby indicates agreement with, and acceptance of, the final
Progress Payment and total Contract Price of $91,531.34, including Washington State
sales and/or use taxes, and the fuial Coritract Time of 30 calendar days, as full and final
compensation for all Work performed in connection with Contract Number No. 4872, and
does hereby release the City of Bremerton from all claims, liability, demands, damages
and actions of any kind whatsoever, arising from perforn�ance of that Contract.
Michels Corporation
By: ��� Date: '� �
��—
Title: �5/� �C�
�
Certificate of Notarv
Subscribed and sworn to before me this pL�' day of �J ,�� �
oFFlCU�� `t't G�l�
SHAWNA IIA THORNTON
NOTARY PUBUC-0REOON ,
COMMISSION NO. 436182
MYCOMMISSION p(PIRES FEBRUARY S, 2013
AFFIDAVIT OF PUBLICATION
Account #42742 AD#263245
STATE OF WASHINGTON
COUNTY OF KITSAP
I, Tara L. Stieber, being first duly swom on oath, deposes and says: That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of
KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court '
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter refened to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an o�ce maintained in the aforesaid
place of publication of said newspaper; that the following is a true text of an advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following date, to wit:
, And on July 23, 2010 such newspaper was regularly distributed to its subscribers during all of said period.
The full amount of the fee charged for the foregoing publication is the sum of $39.86. This amount has not
been paid in full.
(Signature of Principal Clerk)
Subscribed and swom to before me this day of August 6, 2010.
`0' yg9t0l66B�� B
� �° ����1 j''
�R � , sm"�°• A °°,•.
"� �' � �9 �
v � o ,��� o�
, ; �+ ,� n ,� 6 Qa
e°o�0 AV O�•
� Notary Public in and for the State of Washington, Kitsap County. ;: �\� ,�� o'��
, `
- U � �$�, $
��� o� � o ° � ; a
�
NOTICE OF COMPLETION ,'', ��sA��E t1 O¢����� ',`,
Notice of Completion has been issued to Michels Corporation for City Project No. 5076, City Contract No.
4872 for the Cambrian Avenue Sewer Repairs. Any parties having a claim for material, labor or damages
related to this Contract have forty five (45) days from the date of first publication of this notice to file a
claim.
Carol Etgen
City Clerk
345 6th Street
Bremerton, Washington 98337
July 23, 2010 ...............................Ad#20103379
Washington State
�� ('����:�<<��' ���� ��� Department of Revenue
��/��"��� PO Box 47474
Olympia, WA 98504-7474 �
601 061 071
� Certificate of Payment of State Excise `
Taxes by Public Works Contractor
MICHELS CORPORATION CITY OF BREMERTON PUBLIC�WORKS
PO BOX 128 � GUNNAR FRIDRIK5SON •
BROWNSVILLE WI 53006 0128 3027 OLYMPUS DR
BREMERTON WA 98310 4799
We hereby certify that taxes, increases and penalties due or to become due from the above-named �,
contractor under Chapter 180, Laws of 1935, as amended, with respect to the following public works
contract: , .
CITY OF BREMERTON PUBLIC WORKS ,
4872, CAMBRIAN AVE SEWER REPAIR
together with all other taxes, increases and penalties due from such contractor, have been paid in full or that
they are, in the Department's opinion, readily collectible without recourse to the state's lien on the retained
percentage.
This certificate is issued pursuant to the provision of Chapter 60.28 Revised Code of WashingXon for the
sole purpose of infornung the state, county, or municipal officer charged with the duty of disbursing or
authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases
the state's lien on the retained percentage provided by this Chapter for excise taxes due from� said contractor.
This certificate does not release said contractor from liability for additional t� that may be later
determined to be due with respect to the above-mentioned contract or other activities. ,
Dated ���5� C� at Olympia, Washington, �
State of Washington
Department of Revenue �
; �
�+'n� ���
Certifying Officer
For tax assistance, visit dor.wa.gov or call 1-800-647-7706. To inquire about the availability of this document in an altemate format for the visually impaired ,
please call (360) 705-6715. Teletype (TTY) users may call 1-800-451-7985.
— ,
REV 31 0028 (10-01-02) � � � � � �� � �, �
E
� � SEP 0 3 2Q10 .
� .
` � �� .�R�l��_�;�;�"` A" : .'
�, � _�
E STATF
,�`� U�,
� O� �
� �n
L • �
W� Y 2
C
yy � ;sev F
STATE OF WASHINGTON
DEPARTMENT OF LABOR AND INDUSTRIES �
CITY OF BREMERTUN � � � � � �"� � �
ATTN: GUNNAR FRIDRIKSSON ��� o � 2Q ��
3027 OLYMPUS DRIVE
BREMERTON WA 98310
��S�I����R�N� �i'vE�iO�
Certificate of Release of the State's Lien on Public Works Contracts
With this letter, the Washington State Department of Labor & Industries
approves of your release or payment of the contract amount retained
from the following contractor ---
MICHELS CORPORATION 832,318-00 601 061 071
1715 16TH ST SE
SALEM OR 97302
--- related to the following public works contract:
CAMBRIAN AVENUE SEWER REPAIR
5076
In our opinion, all workers' compensation insurance premiums, increases,
and penalties due to L&I from this contractor have been paid in full or
are readily collectible without recourse to the state's lien on the
retained percentage.**
This letter's sole purpose is to communicate our release of the state's
lien to the public official responsible for paying or authorizing the
pal�ment of �ublic fe�.^.ds to the contractor named above.
If we later determine that the contractor owes additional premiums
related to the above-mentioned contract or other activities, the
contractor is still liable for payment.
Dated November 1, 2010 at Olympia, Washington.
State of Washington
Departm nt of Lab � Industries
�
Contract Release Specialist
WENDY MCCLEARY -
360-902-5772 or MCWE235u1LNI.WA.GOV
** Title 51 RCW authorizes L8�I to collect workers' compensation
insurance premiums, increases, and penalties.
Chapter 60.28 RCW establishes L&I's priority regarding this lien.
� Employment Security Depa�tment
-� WASHII�iGTON SiATE
CONTRACTOR: MICHELS CORP � ) CERTIFICATE OF
PO BOX 128 ) PAYMENT OF CONTRIBIlTIONS
BROWNSVILtE, WI 53006 ) PENALTIES AND INTEREST ON
) PUBLIC WORKS CONTRACT
� ES Reference No. 657299-00 5
TO: CITY OF BREMERTON
3027 OLYMPIJS DR
BREMERTON, WA 98310
The Empioyment Security Department hereby certifies those contributions, penalties and
interest due from the above named contractor under the Employment Security Act have been paid
in full or provided for with respect to the following public works contract:
4872
The Employment Security Department hereby certifies that it has no claim pursuant to '
RCW 50.24.130 against the public body named above for tax attributable to service performed
for said pubiic body by the above named contractor on the above described convac� The
Employment Security Department releases its lien on the retained percentage, which is provided by
RCW 60.28.040 for contributions, penalties and interest due from said contractor.
This certificate does not release said contractor from liability for additional contribudons,
penalties and interest which may be later determined to be due with respect to the above
mentioned contract.
Dated at Olympia, Washington on August 4, 2010.
COMMISSIONER
EMPLOYMENT SECIlRITY DEPARTMENT
. B
(Authorized Represe dve) .
Ortginal—Disbursing Officer
Duplicate—Employer � � � � � � � � �
Triplicate—Central Office Files 2010
, s AUG 0 9 '�
EMS 8449 760 R3-98 ; i
,. ; i
' �C<<:�!����i:i�''e r y L�� ��� ..-� !
4 � , •--
Contract Number: 4872
Vendor: MICHELS CORPORATION
Subject: Construct Cambrian Avenue Sewer Repair
Department: Engineering
File Class: LEG 12 -1
Begin Date: 1/4/2010
End Date: 3/31/2010
Review Date: 5/1/2010
Vault Date: 1/1/2012
Comments: Change Order #1 -3/10 - Notice of Completion 7 -23 -2010
., ,
AFFIDAVIT OF PUBLICATION
Account #42742 AD#263245 �
STATE OF WASHINGTON �
COUNTY OF KITSAP
I, Tara L. Stieber, being first duly sworn on oath, deposes and says: That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of
KITSAP SLTN; that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an office maintained in the aforesaid
place of publication of said newspaper; that the following is a true text of an advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following date; to wit: �
And on July 23, 2010 such newspaper was regularly distributed to its subscribers during all of said period.
The full amount of the fee charged for the foregoing publication is the sum of $39.86. This amount has not
been paid in full.
(Signature of Principal Clerk)
Subscribed and sworn to before me this day of August 6, 2010.
� ����������
�� �
. ���� � ,� �
_�. � �1 •
• � `V �
Notary Public in and for the State of Washington, Kitsap County. ;s� • �J ' �V ��
,, . `J .
. . .
, ����''��SrATE ��•'��``,
NOTICE OF COMPLETION
���,����,,,,,,.
Notice of Completion has been issued to Michels Corporation for City Project No. 5076, City Contract No.
4872 for the Cambrian Avenue Sewer Repairs. Any parties having a claim for material, labor or damages
related to this Contract have forty five (45) days from the date of first publication of this notice to file a
claim.
Carol Etgen
City Clerk
345 6th Street
Bremerton, Washington 98337
July 23, 2010 ...............................Ad#20103379
4°
Contract Numbe�: 4872
Vendor: MICHELS CORPORATION
Subject: . Construct Cambrian Avenue Sewer Repair
Department: Engineering
File Class: LEG 12-1
Begin Date: Ol/04/2010
End Date: 03/31/2010
Review Date: 05/01/2010
Vault Date:
Comments: Change Order #1-3/10
�I
I
�
i
�
�
CITY OF BREMERTON
� _ . CHANGE ORDER
CONTRACT CHANGE ORDER NO: 'I
PROJECT NAME: Cambrian Avenue Sewer Repair
PROJECT NO: 5076 CONTRACTOR: Michels Corporation
ORIGINAL CONTRACT AMOUNT: $72,803.27 DAYS: 30
PREVIOUSLY APPROVED CHANGES: y $0 DAYS: 0
THIS CHANGE: $18,728.07 DAYS: 0
REVISED CONTRACT AMOUNT: $91,531.34 DAYS: 30
This Change Order covers changes to the subject contract as described herein. The Contractor shall
construct, furnish equipment and materials, and perform all work as necessary or required to complete the
Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes.
DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT
o � CONTRACT CONTRACT TIME
� � AMOUNT AMOUNT EXTENSION
� � ($) � ($) (DAYS:)
� �
� �
In completing contract negotiations with the Contractor,
two issues were raised:
• The main between 13"' Street to 11"' Street was
identified as 12-inch concrete pipe. It is in
actuality 15-inch concrete pipe, requiring a larger
liner size to be utilized over the 630 feet of
length.
• The documents identify the City as the
responsible party for cleaning and videoing the
� main before the liner installation. As the lining
success is dependent on this work, responsibility
snould 'oe ihe Co���iact�r's �or ensuri�r� th2'
cleaning meets the liner requirements.
To resolve these issues, a proposal was requested from
the Contractor. Costs associated with the revisions
appear appropriate and reasonable and therefore are to $18,728.07
be included into the project. Cost includes Washington
State Sales Tax.
NET CHANGE IN CONTRACT AMOUNT $18,728.07 0
� INCREASE OR (DECREASE)
Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any
kind or nature arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits.
Nothing in this Change Order shall limit the City's right to bring a claim for past pertormance.
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contra�t
price specified for each item, including any and all supervision costs and other miscellaneous costs relating to
the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to
said Change Order.
I
CONTRACT CHANGE ORDER NO: �
PROJECT NAME: Cambrian Avenue Sewer Repair
This document will become a supplement of the contract and all provisions will apply hereto. It is understood
that this Change Order shall be effective when approved by the City of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a change order that is
binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of
this change, and shall take appropriate action to modify any bonds required under the contract to address this
change.
RECOMMENDED: ��� � 3 �` (�
PRO ECT ENGINEER ate
�' i��;,�-- �� y � ,,,,,, ,,,,N,,,,,,, ,
RECOMMENDED: � ��.
� .
CITY ENGINEER / DIRECTOR OF PUBLIC WORKS ����-�`'' �� ''•••.!L��'�,
;� �:'�� � � :
� v � � � � :°=
ACCEPTED: - .
CONT C O , �t �y ,: �� �
:
°�, u�"•-.o� .�'
'f, 1�. ....••�'` ��.�
� d �'���`''ya I SJV ��•`.
APPROVED: "�1,,,,,,►S"`�'`
MAYOR Date
APP FOR • ATTEST:
� /.
,
' Attorney y Cler
Page 2 of 2
Contract Number:
Vendor:
Subject:
Department:
File Class:
Begin Date:
End Date:
Review Date:
Vault Date:
4872
MICHELS CORPORATION
Construct Cambrian Avenue Sewer Repair
Engineering
LEG 12-1
O1/04/2010
03/31/2010
03/O1/2010
Comments :
�
PUBLIC WORKS AGREEMENT
THIS AGREEMENT, is entered into between the City of Bremerton, a Washington
Municipal Corporation ("City"), and Michels Corporation ("Contractor"), whose mailing address
is 1715 16 Street, Salem, Oregon 97302.
The parties agree as follows:
1. CONTRACTOR SERVICES. The Contractor shall perform construction
services, in accordance with generally accepted standards and at the direction of the Public
Works Director (Director) for the following project:
Provide labor, equipment, and materials necessary to perform repairs of sanitary lines from 13
Street on Cambrian Avenue south to ll Street, then diagonally across ll to Mead Avenue
easterly from there to Wycoff Avenue. A detailed description of services is included herein as
Attachment 1. The Work shall conform to the 2008 Standard Specifications for Road, Bridge,
and Municipal Construction and the Technical Specifications included herein as Attachment 2.
All work shall be performed under the control of the Director as provided in Section 1-OS
CONTROL OF WORK of the 2008 Standard Specifications for Road, Bridge and Municipal
Construction.
2. TIME OF COMPLETION. The Contract time shall be divided into two phases.
Phase I, Procurement, shall be 30 calendar days and shall begin on the date of Notice to Proceed.
Phase II, Construction, shall be 30 calendar days and shall begin upon receipt of a second Notice
to Proceed from the City. Issuance of the second Notice to Proceed is dependant on consultation
between the City and the Contractor.
3. COMPENSATION. The City shall pay the Contractor the total amount of
$67,038.00 plus applicable Washington State Retail Sales Tax. The Contractor shall invoice the
City monthly. The City will pay for the portion of the work described in the invoice that has
been completed by the Contractor and approved by the City. The City payment shall not
constitute a waiver of the City's right to final inspection and acceptance of the project.
A. Performance Bond. Pursuant to Chapter 39.08 RCW, the Contractor, shall
provide the City a performance bond for the full contract amount to be in
effect until sixty (60) days after the date of final acceptance, or until
receipt of all necessary releases from the State Department of Revenue
and the State Department of Labor and Industries and until settlement of
any liens filed under Chapter 60.28 RCW, whichever is later.
B. Retaina�e. The City shall hold back a retainage in the amount of five
percent (5%) of any and all payments made to contractor for a period of
sixty (60) days after the date of final acceptance, or until receipt of all
necessary releases from the State Department of Revenue and the State
0
PUBLIC WORKS AGREEMENT — Page 1 of 9 (December 14, 2009)
(between City of Bremerton and Michels Corporation)
Department of Labor & Industries and until settlement of any liens filed
under Chapter 60.28 RCW, whichever is later.
C. Defective or Unauthorized Work. The City reserves its right to withhold
payment from Contractor for any defective or unauthorized work.
Defective or unauthorized work includes, without limitation: work and
materials that do not conform to the requirements of this agreement; and
extra work and materials furnished without the City's written approval. If
Contractor is unable, for any reason, to satisfactorily complete any portion
of the work, the City may complete the work by contract or otherwise, and
Contractor shall be liable to the City for any additional costs incurred by
the City. "Additional costs" shall mean all reasonable costs, including
legal costs and attorney fees, incurred by the City beyond the maximum
Contract price specified above. The City further reserves its right to \
deduct the cost to complete the Contract work, including any Additional
Costs, from any and all amounts due or to become due the Contractor.
D. Final Pavment: Waiver of Claims. THE ACCEPTANCE OF FINAL
PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL
CONSTITUTE A WAIVER OF CLAIMS, EXCEPT THOSE
PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY
CONTRACTOR AS UNSETTLED AT THE TIME REQUEST FOR
FINAL PAYMENT IS MADE.
4. INDEPENDENT CON'�'RACTOR. Contractor is and shall be at all times
acting as an independent contractor and not as an employee of the City. The Contractor shall
secure at its expense, and shall be responsible for all payments of income tax, social security,
state industrial insurance compensation, unemployment compensation, and all other payroll
deductions for the Contractor, officer, agents, employees and sub-contractors. The Contractor
shall also secure all applicable business licenses, if required, in connection with the contract
services, including all required licenses for Contractor's officers, agents, employees and sub-
contractors.
5. TERMINATION. The City may terminate this agreement without notice for
good cause. "Good cause" shall include, without limitation, any one or more of the following
events:
A. The Contractor's failure to supply sufficient skilled workers or suitable
materials or equipment.
B. The Contractor's failure to prosecute the work with such diligence as will
ensure its physical completion within the original physical completion
time specified in this Agreement and any extensions of time which may
have been granted to the Contractor by change order or otherwise.
PUBLIC WORKS AGREEMENT — Page 2 of 9 (December 14, 2009)
(between City of Bremerton and Michels Corporation)
C. The Contractor's failure to make full and prompt payment to
subcontractors or for material or labor.
D. The Contractor's disregard of federal, state or local laws, rules or
regulations.
E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt.
F. The Contractor disregards the authority of the City.
G. The Contractor performs work which deviates from the Contract, and
neglects or refuses to correct rejected work.
H. The Contractor's failure to provide continuous competent supervision.
I. The Contractor otherwise violates in any material way any provisions or
requirements of the contract.
If the City terminates this agreement for good cause, the Contractor shall not receive any
monies due under this agreement, if any, until the Contract work is completed.
6. PREVAILING WAGES. Contractor shall file a"Statement of Intent to Pay
Prevailing Wages," with the State of Washington Department of Labor & Industries prior to
commencing the Contract work. Contractor shall pay Kitsap County prevailing wages and
comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable
prevailing wage rate provisions. The latest prevailing wage rate revision issued by the
Department of Labor and Industries is attached.
7. CHANGES. The City may issue a written or oral work change directive for any
change in the Contract work during the performance of this agreement. If the Contractor
determines, for any reason, that a change order is necessary, Contractor must submit a written
change order request to the City's project manager within two (2) business days of the date the
Contractor knew or should have known of the facts and events giving rise to the requested
change. If the City determines that the change increases or decreases the Contractor's costs or
time for performance, the City will make an equitable adjustment. The City will attempt, in
good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the
parties are unable to agree, the City will determine the equitable adjustment as it deems
appropriate. The Contractor shall proceed with the change order work upon receiving either a
written or oral work change directive from the City or a change order from the City. If the
Contractor fails to request a change order within the time allowed, the Contractor waives its right
to make any claim or submit subsequent change order requests for that portion of the contract
work. If the Contractor disagrees with the equitable adjustment the Contractor must complete
the change order work; however, the Contractor may elect to protest the adjustment as provided
below:
PUBLIC WORKS AGREEMENT — Page 3 of 9 (December 14, 2009)
(between City of Bremerton and Michels Corporation)
A. Procedure and Protest bv the Contractor. If the Contractor disagrees with
anything required by a written work change directive, oral work change
directive or change order, including any direction, instruction,
interpretation, or determination by the City, the Contractor shall:
1. Give a signed written notice of protest to the City within one
business day;
2. Supplement the written protest within five (5) calendar days with a
written statement that provides the following information:
a.
b.
c.
d.
e.
The date of the Contract's protest.
The nature and circumstances that caused the protest.
The provisions in this agreement that support the protest.
The estimated dollar cost, if any, of the protested work and
how that estimate was determined.
An analysis of the progress schedule showing the schedule
change or disruption if the Contractor is asserting a
schedule change or disruption.
The Contractor shall keep complete records of extra costs and time
incurred as a result of the protested work. The City shall have
access to any of the Contractor's records needed for evaluating the
protest.
The City will evaluate all protests, provided the procedures in this
section are followed. If the City determines that a protest is valid,
the City will adjust payment for work or time by an equitable
adjustment. No adjustment will be made for an invalid protest.
B. Contractor's Duty to Complete Protested Work. In spite of any protest,
the Contractor shall proceed promptly with the work as the City has
ordered.
C. Contractor's Acceptance of Chan es. The Contractor accepts all
requirements of a change order by: (1) endorsing it, (2) writing a separate
acceptance, or (3) not protesting in the way this section provides. A
change order that is accepted by Contractor as provided in this section
shall constitute full payment and final settlement of all claims for contract
time and for direct, indirect and consequential costs, including costs of
delays related to any work, either covered or affected by the change.
D. Failure to Protest Constitutes Waiver. By not protesting as this section
provides, the Contractor also waives any additional entitlement and
accepts from the City any written or oral order (including directions,
instructions, interpretations, and determination).
PUBLIC WORKS AGREEMENT — Page 4 of 9 (December 14, 2009)
(between Ciry of Bremerton and Michels Corporation)
E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the
procedures of this section, the Contractor completely waives any claims
for protested work and accepts from the City any written or oral order
(including directions, instructions, interpretations, and determination).
8. CLAIMS. The Contractor shall give written notice to the City of all claims other
than change orders within fourteen (14) calendar days of the occurrence of the events giving rise
to the claims. Any claim for damages, additional payment for any reason, or extension of time,
whether under this agreement or otherwise, shall be conclusively deemed to have been waived
by the Contractor unless a timely written claim is made in strict accordance with the applicable
provisions of this agreement; or, if (and only i� no such provision is applicable, unless that claim
is set forth in detail in writing and received by the City within seven (7) calendar days from the
date Contractor knew, or should have known, of the facts giving rise to the claim. At a
minimum, a Contractor's written claim must include the information set forth regarding protests
in Section 7.A.2.a.-e.
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM
WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS
ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM
OR CAUSED BY THAT DELAY.
Contractor must, in any event, file any claim or bring any suit arising from or connected
with this agreement within 120 calendar days from the date the contract work is complete.
9. WARRANTY. The Contractor shall correct all defects in workmanship and
materials within one year from the date of the Contractor's acceptance of the City's final
payment under this contract. When defects are corrected, the warranty for that portion of the
work shall extend for one year form the date such correction is completed and accepted by the
City. The Contractor shall begin to correct any defects within seven (7) calendar days of its
receipt of notice from the City of the defect. If the Contractor does not accomplish the
corrections within a reasonable time, the City may complete the corrections and the Contractor
shall pay all costs incurred by the City in order to accomplish the correction.
10. INI2EMNIFICATION. Contractor shall defend, indemnify and hold the City, its
officers, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits including all legal costs and attorney fees, arising out of or in connection
with the performance of this agreement, except for injuries and damages solely caused by the
City's negligence.
The City's inspection or acceptance of any of Contractor's work when completed shall
not be grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor and
PUBLIC WORKS AGREEMENT — Page 5 of 9 (December 14, 2009)
(between Ciry of Bremerton and Michels Corporation)
the City, its officials, employees, agents and volunteers, the Contractor's liability hereunder shall
be only to the extent of the Contractor's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS
1NDEMNIFICATION CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY
UNDER INDUSTRIAL 1NSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF
THIS INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE
MUTUALLY NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration or termination of this
agreement.
11. INSURANCE. The Contractor shall procure and maintain for the duration of this
agreement, insurance against claims for injuries to persons or damage to property that may arise
from or in connection with the performance of the Contract work by the Contractor, its agents,
representatives, employees or subcontractors.
Before beginning the work on the project described in this agreement, the Contractor
shall provide a Certificate of Insurance evidencing:
A. Automobile Liabilitv insurance with limits no less than $1,000,000 combined
single limit per accident for bodily injury and property damage; and
B. Commercial General Liabilitv insurance written on an occurrence basis with
limits no less than $2,000,000 combined single limit per occurrence and
$2,000,000 aggregate for personal injury, bodily injury and property damage.
Coverage shall include but not be limited to: blanket contractual;
products/completed operations/broad form property damage; explosion,
collapse and underground (XCU) if applicable; and employer's liability.
Any payment of deductible or self insured retention shall be the sole responsibility of the
Contractor.
The City reserves the right to receive a certified copy of all the required insurance
policies.
The City, its officials, employees, agents and volunteers shall be named as an additional
insured on the insurance policy, as respects work performed by or on behalf of the Contractor
and a copy of the endorsement naming the City as additional insured shall be attached to the
Certificate of Insurance.
The Contractor's insurance shall contain a clause stating that coverage shall apply
separately to each insured against whom claim is made or suit is brought, except with respects to
the limits of the insurer's liability.
PUBLIC WORKS AGREEMENT — Page 6 of 9 (December 14, 2009)
(between City of Bremerton and Michels Corporation)
The Contractor's insurance shall be primary insurance as respects the City, and the City
shall be given thirty (30) calendar days prior written notice by certified mail, return receipt
requested, of any cancellation, suspension or material change in coverage.
If this contract requires work to be performed in or on navigable waters, the Contractor
shall provide insurance written on an occurrence basis with limits no less than $2,000,000
combined single limit per occurrence and $2,000,000 aggregate for claims made under the
Longshoreman and Harbor Workers Act and the Jones Act.
>
12. MISCELLANEOUS.
A. Nondiscrimination. In the hiring of employees for the performance of
work under this Agreement or any sub-contract hereunder, the Contractor,
its sub-contractors, or any person acting on behalf of such Contractor or
sub-contractor shall not, by reason of race, religion, color, sex, national
origin, or the presence of any sensory, mental, or physical disability,
discriminate against any person who is qualified and available to perform
the work to which the employment relates.
B. Compliance with Laws. Contractor shall comply with all federal, state
and local laws, rules and regulations throughout every aspect in the
performance of this agreement.
C. Work Performed at Contractor's Risk. Contractor shall take all
precautions necessary and shall be responsible for the safety of its
employees, agents, and subcontractors in the performance of this
agreement. All work shall be done at Contractor's own risk, and
Contractor shall be responsible for any, loss of or damage to materials,
tools, or other articles used or held for use in connection with the work.
D. Nonwaiver of Breach. The failure of the City to insist upon strict
performance of any of the terms and rights contained herein, or to exercise
any option herein conferred in one or more instances, shall not be
construed to be a waiver or relinquishment of those terms and rights and
they shall remain in full force and effect
E. Governing Law. This agreement shall be governed and construed in
accordance with the laws of the State of Washington. If any dispute arises
between the City and Contractor under any of the provisions of this
agreement, resolution of that dispute shall be available only through the
jurisdiction, venue and rules of the Kitsap County Superior Court, Kitsap
County, Washington.
F. Attornev's Fees. To the extent not inconsistent with RCW 39.04.240, in
any claim or lawsuit for damages arising from the parties' performance of
this agreement, each party shall be responsible for payment of its own
PUBLIC WORKS AGREEMENT — Page 7 of 9 (December 14, 2009)
(between Ciry of Bremerton and Michels Corporation)
legal costs and attorney's fees incurred in defending ar bringing such
claim or lawsuit; however, nothing in this subsection shall limit the City's
right to indemnification under Section 10 of this agreement.
G. Written Notice. All communications regarding this agreement shall be
sent to the parties at the addresses listed on the signature page of this
agreement, unless otherwise notified. Any written notice shall become
effective upon delivery, but in any event three (3) calendar days after the
date of mailing by registered or certified mail, and shall be deemed
sufficiently given if sent to the addressee at the address stated on this
agreement.
H. Assi�. Any assignment of this agreement by the Contractor without
the written consent of the City shall be void.
I. Modification. No waiver, alteration, or modification of any of the
provisions of this agreement shall be binding unless in writing and signed
by a duly authorized representative of the City and Contractor.
J. Severabilitv. If any one or more sections, sub-sections, or sentences of
this agreement are held to be unconstitutional or invalid, that decision
shall not affect the validity of the remaining portion of this agreement and
the remainder shall remain in full force and effect.
K. Entire A�reement. The written provisions and terms of this agreement,
together with any attached Exhibits, supersede all prior verbal statements
by any representative of the City, and those statements shall not be
construed as forming a part of or altering in any manner this agreement.
This agreement and any attached Exhibits contain the entire agreement
between the parties. Should any language in any Exhibit to this agreement
conflict with any language contained in this agreement, the terms of this
agreement shall prevail.
PUBLIC WORKS AGREEMENT — Page 8 of 9 (December 14, 2009)
(between Ciry of Bremerton and Michels Corporation)
IN WITNESS WHEREOF, the parties below have executed this agreement.
CONTRACTOR
`````�� �� �� � i i i i i r►ii,,��
� :•• • •.!�� ��1 e: K�ll
� � � � � ����� v�
'Z: ^� 2�:�
=., 3 �.��`�.,� l Z{?1,�c�
?� '
''���''�> • ���?.L`d�� •`��``•
''���,,,,,,,,,�0���`11�otices to be sent to:
CONTRACTOR:
Michels Corporation
1715 16'" Street
Salem, Oregon 97302
(503) 364-1199
(503) 391-8317 (facsimile)
R:\LEGAL\Contracts\FORM S\ShortForm. P W.Agr.doc
THE CITY OF BREMERTON
� �Z
Print Name: � L.E� --
Title:
DATE /��
/ /
Notices to be sent to:
CITY OF BREMERTON:
City Clerk
345 6` Street, 6 Floor
Bremerton, WA 98337
(360) 473-5323
(360) 473-5200 (facsimile)
APPROVED AS TO FORM:
PUBLIC WORKS AGREEMENT — Page 9 of 9 (December 14, 2009)
(between Ciry of Bremerton and Michels Corporation)
� rv , �
Bremerto City Clerk
PREVAILING WAGES
State of Washington
DEPARTMENT OF LABOR AND INDUSTRIES
Prevailing Wage Section - Telephone (360) 902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage Rates For Public Works Contracts
The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits.
On public works projects, workers' wage and benefit rates must add to not less than this totat. A brief description
of overtime calculation requirements is provided on the Benefit Code Key.
KITSAP COUNTY
Effective 08-31-07
**************��********************�***********************,�**�**************************�***************
(See Benefit Code Key)
Over
` PREVAILING Time Hohday Note
Classification WAGE Code Code Code
ASBESTOS ABATEMENT WORKERS
JOURNEYLEVEL
BOILERMAKERS
JOURNEYLEVEL
BRICK AND MARBLE MASONS
JOURNEYLEVEL
CABINET MAKERS (IN SHOP)
JOURNEYLEVEL
CARPENTERS
ACOUSTICAL WORKER
BRIDGE, DOCK AND WARF CARPENTERS
CARPENTER
CREOSOTED MATERIAL
DRYWALL APPLICATOR
FLOOR FINISHER
FLOOR LAYER
FLOOR SANDER
MILLWRIGHT AND MACHINE ERECTORS
PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING
SAWFILER
SHINGLER
STATIONARY POWER SAW OPERATOR
STATIONARY WOODWORKING TOOLS
CEMENT MASONS
JOURNEYLEVEL
DIVERS 8� TENDERS
DIVER
DIVER TENDER
DREDGE WORKERS
ASSISTANT ENGINEER
ASSISTANT MATE (DECKHAND)
BOATMEN
ENGINEER WELDER
LEVERMAN, HYDRAULIC
MAINTENANCE
MATES
OILER
DRYWALL TAPERS
JOURNEYLEVEL
ELECTRICAL FIXTURE MAINTENANCE WORKERS
JOURNEYLEVEL
$36.24 1 H
$30.34 1
$43.75 1 M
$12.53 1
$43.91
$43.75
$43.75
$43.85
$43.79
$43.75
$43.75
$43.75
$44.75
$43.95
$43.75
$43.75
$43.75
$43.75
1M
1M
1M
1M
1M
1M
1M
1M
1M
1M
1M
1M
1M
1M
$44.58 1 M
$85.75 1 M
$44.22 1 M
$44.59
$44.08
$44.59
$44.64
$46.21
$44.08
$44.59
$44.21
1T
1T
1T
1T
1T
1T
1T
1T
5D
5A
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
8A
5D
5D
5D
5D
5D
5D
5D
5D
$43.59 1 E 5P
$9.37 1
8L
8L
8L
8L
8L
8L
8L
8L
Page 1
KITSAP COUNTY
Effective 08-31-07
**********************************************************************************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
ELECTRICIANS - INSIDE
CABLE SPLICER
CABLE SPLICER (TUNNEL)
CERTIFIED WELDER
CERTIFIED WELDER (TUNNEL)
CONSTRUCTION STOCK PERSON
JOURNEYLEVEL
JOURNEYLEVEL(TUNNEL)
ELECTRICIANS - MOTOR SHOP
CRAFTSMAN �
JOURNEY�EVEL
ELECTRICIANS - POWERLINE CONSTRUCTION
CABLE SPLICER
CERTIFIED LINE WELDER
GROUNDPERSON
HEAD GROUNDPERSON
HEAVY LINE EQUIPMENT OPERATOR
JACKHAMMER OPERATOR
JOURNEY LEVEL LINEPERSON
LINE EQUIPMENT OPERATOR
POLE SPRAYER
POWDERPERSON
ELECTRONIC TECHNICIANS
ELECTRONIC TECHNICIANS JOURNEY LEVEL
ELEVATOR CONSTRUCTORS
MECHANIC
MECHANIC IN CHARGE
FABRICATED PRECAST CONCRETE PRODUCTS
ALL CLASSIFICATIONS
FENCE ERECTORS
FENCE ERECTOR
FENCELABORER
FLAGGERS
JOURNEYLEVEL
GLAZIERS
JOURNEYLEVEL
HEAT 8� FROST INSULATORS AND ASBESTOS WORKERS
MECHANIC
HEATING EQUIPMENT MECHANICS
MECHANIC
HOD CARRIERS & MASON TENDERS
JOURNEYLEVEL
INDUSTRIAL ENGINE AND MACHINE MECHANICS
MECHANIC
INDUSTRIAL POWER VACUUM CLEANER
JOURNEYLEVEL
INLAND BOATMEN
CAPTAIN
COOK
DECKHAND
ENGINEER/DECKHAND
MATE,LAUNCH OPERATOR
$55.05
$58.86
$53.16
$57.15
$27.32
$51.25
$55.05
$15.37
$14.69
$54.37
$49.64
$35.93
$37.89
$49.64
$37.89
$49.64
$42.27
$49.64
$37.89
$40.08
$57.88
$63.45
$13.50
$13.80
$11.60
$31.01
$43.76
$46.13
$18.45
$36.75
$15.65
$9.10
1D
1D
1D
1D
1D
1D
1D
5A
5A
5A
5A
5A
5A
5A
2A 6C
2A 6C
4A
4A
4A
4A
4A
4A
4A
4A
4A
4A
5A
5A
5A
5A
5A
5A
5A
5A
5A
5A
il!7
5A
4A 6Q
4A 6Q
1
1
1
1H 5D
1H 5G
1 S 5J
1
1H 5D
1
1
$38.04 1 K 56
$31.90 1 K 5B
$31.59 1 K 56
$34.37 1 K 56
$36.02 ' 1 K 56
Page 2
KITSAP COUNTY
Effective 08-31-07
*,�*************�***************************�************�*******************************�*�***************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
INSPECTION/CLEANING/SEALING OF SEWER & WATER SYSTEMS BY
REMOTE CONTROL
CLEANER OPERATOR,FOAMER OPERATOR
GROUT TRUCK OPERATOR
HEAD OPERATOR
TECHNICIAN
N TRUCK OPERATOR
INSULATION APPLICATORS
JOURNEYLEVEL
IRONWORKERS
JOURNEYLEVEL
LABORERS
ASPHALT RAKER
BALLAST REGULATOR MACHINE
BATCH WEIGHMAN
BRUSH CUTTER
BRUSH HOG FEEDER
BURNERS
CARPENTER TENDER
CASSION WORKER
CEMENT DUMPER/PAVING
CEMENT FINISHER TENDER
CHANGE-HOUSE MAN OR DRY SHACKMAN
CHIPPING GUN (OVER 30 LBS)
CHIPPING GUN (UNDER 30 LBS)
CHOKER SETTER
CHUCK TENDER
CLEAN-UP LABORER
CONCRETE DUMPER/CHUTE OPERATOR
CONCRETE FORM STRIPPER
CONCRETE SAW OPERATOR
CRUSHER FEEDER
CURING LABORER
DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED MATERIALS)
DITCH DIGGER
DIVER
DRILL OPERATOR (HYDRAULIC, DiAMOND)
DRILL OPERATOR, AIRTRAC
DUMPMAN
EPDXY TECHNICIAN
EROSION CONTROL WORKER
FALLER/BUCKER, CHAIN SAW
FINAL DETAIL CLEANUP (i.e., dusting, vacuuming, window cleaning, NOT
construction debris cleanup)
FINE GRADERS
FIRE WATCH
FORM SETTER
GABION BASKET BUILDER
GENERALLABORER
GRADE CHECKER & TRANSIT PERSON
GRINDERS
GROUT MACHINE TENDER
$9.73 �
$11.48 1
$12.78 1
$7.93 1
$24.17 1
$43.75 1 M
$47.92 1 O
$36.75
$36.24
$31.01
$36.24
$36.24
$36.24
$36.24
$37.20
$36.75
$36.24
$36.24
$36.75
$36.24
$36.24
$36.24
$36.24
$36.75
$36.24
$36.75
$31.01
$36.24
$36.24
$36.24
$37.20
$36.75
$37.20
$36.24
$36.24
$36.24
$36.75
$28.45
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
$36.24
$31.01
$36.24
$36.24
$36.24
$36.75
$36.24
$36.24
1H
1H
1H
1H
1H
1H
1H
1H
5D
5A
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
Page 3
KITSAP COUNTY
Effective 08-31-07
**********************************************************************************************************
• (See Benefit Code Key)
• Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
GUARDRAIL ERECTOR
HAZARDOUS WASTE WORKER LEVEL A
HAZARDOUS WASTE WORKER LEVEL B
HAZARDOUS WASTE WORKER LEVEL C
HIGH SCALER
HOD CARRIER/MORTARMAN
JACKHAMMER
LASER BEAM OPERATOR
MANHOLE BUILDER-MUDMAN
MATERIAL YARDMAN
MINER
NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH
PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST, GUNITE,
SHOTCRETE, WATER BLASTER
PAVEMENT BREAKER
PILOT CAR
PIPE POT TENDER
PIPE RELINER (NOT INSERT TYPE)
PIPELAYER & CAULKER
PIPELAYER & CAULKER (LEAD)
PIPEWRAPPER
POT TENDER
POWDERMAN
POWDERMAN HELPER
POWERJACKS
RAILROAD SPIKE PULLER (POWER)
RE-TIMBERMAN
RIPRAP MAN
RODDER
SCAFFOLD ERECTOR
SCALE PERSON
SIGNALMAN
SLOPER (OVER 20")
SLOPER SPRAYMAN
SPREADER (CLARY POWER OR SIMILAR TYPES)
SPREADER(CONCRETE)
STAKE HOPPER
STOCKPILER
TAMPER & SIMILAR ELECTRIC, AIR & GAS
TAMPER (MULTIPLE & SELF PROPELLED)
TOOLROOM MAN (AT JOB SITE)
TOPPER-TAILER
TRACKLABORER
TRACK LINER (POWER)
TRUCK SPOTTER
TUGGER OPERATOR
VIBRATING SCREED (AIR, GAS, OR ELECTRIC)
VIBRATOR
VINYL SEAMER
WELDER
WELL-POINT LABORER
$36.24
$37.20
$36.75
$36.24
$37.20
$36.75
$36.75
$36.75
$36.75
$36.24
$37.20
$36.75
$36.75
$31.01
$36.75
$36.75
$36.75
$37.20
$36.75
$36.24
$37.20
$36.24
$36.75
$36.75
$37.20
$36.24
$36.75
$36.24
$36.24
$36.24
$36.75
$36.24
$36.75
$36.75
$36.24
$36.24
$36.75
$36.75
$36.24
$36.24
$36.24
$36.75
$3624
$36.75
$36.24
$36.75
$3624
$36.24
$36.75
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
iH
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
1H
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
Page 4
KITSAP COUNTY
Effective 08-31-07
********���***************************�*************�************�*�****************�********************�
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
LABORERS - UNDERGROUND SEWER 8� WATER
GENERALLABORER
PIPE LAYER
LANDSCAPE CONSTRUCTION
IRRIGATION OR LAWN SPRINKLER INSTALLERS
LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS
LANDSCAPING OR PLANTING LABORERS
LATHERS
JOURNEYLEVEL
METAL FABRICATION (IN SHOP)
FITTER
LABORER
MACHINE OPERATOR
WELDER
MODULAR BUILDINGS
CABINET ASSEMBLY
ELECTRICIAN
EQUIPMENT MAINTENANCE
PLUMBER
PRODUCTION WORKER
TOOL MAINTENANCE
UTILITY PERSON
WELDER
PAINTERS
JOURNEYLEVEL
PLASTERERS
JOURNEYLEVEL
PLAYGROUND & PARK EQUIPMENT INSTALLERS
JOURNEYLEVEL
PLUMBERS & PIPEFITTERS
JOURNEYLEVEL
POWER EQUIPMENT OPERATORS
ASSISTANT ENGINEERS
BACKHOE, EXCAVATOR, SHOVEL (3 YD & UNDER)
BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YD & UNDER 6 YD)
BACKHOE, EXCAVATOR, SHOVEL (6 YD AND OVER WITH ATTACHMENTS)
BACKHOES, (75 HP & UNDER)
BACKHOES, (OVER 75 HP)
BARRIER MACHINE (ZIPPER)
BATCH PLANT OPERATOR,CONCRETE
BELT LOADERS (ELEVATING TYPE )
BOBCAT (SKID STEER)
BROOMS
BUMP CUTTER
CABLEWAYS
CHIPPER
COMPRESSORS
CONCRETE FINISH MACHINE - LASER SCREED
CONCRETE PUMPS
CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT
CONVEYORS
CRANES, THRU 19 TONS, WITH ATTACHMENTS
$36.24 1 H 5D
$36.75 1 H 5D
$9.25 1
$10.05 1
$12.92 1
$43.79
1M
�
$26.96
$7.93
$13.83
$13.83
$11.56
$11.56
$11.56
$11.56
$9.26
$11.56
$11.56
$11.56
$33.16 26
$43.10 1 R
$8.54 1
$50.22 1 G
1
1
1
1
1
1
1
1
$42.14
$44.92
$45.41
$45.96
$44.50
$44.92
$44.92
$44.92
$44.50
$42.14
$42.14
$44.92
$45.41
$44.92
$42.14
$42.14
$44.50
$44.92
$44.50
$44.50
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
5A
56
5A
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
Page 5
KITSAP COUNTY
Effective 08-31-07
******�*�****************�********************��**********************************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
CRANES, 20 - 44 TONS, WITH ATTACHMENTS
CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB
WITH ATACHMENTS)
CRANES, 100 TONS - 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB
WITH ATTACHMENTS)
CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB
WITH ATTACHMENTS)
CRANES, A-FRAME, 10 TON AND UNDER
CRANES, A-FRAME, OVER 10 TON
CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH
ATTACHMENTS
CRANES, OVERHEAD, BRIDGE TYPE ( 20 - 44 TONS)
CRANES, OVERHEAD, BRIDGE TYPE ( 45 - 99 TONS)
CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER)
CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM
CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM
CRUSHERS
DECK ENGINEER/DECK WINCHES (POWER)
DERRICK, BUILDING
DOZERS, D-9 & UNDER
DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT
DRILLING MACHINE
ELEVATOR AND MANLIFT, PERMANENT AND SHAFT-TYPE
EQUIPMENT SERVICE ENGINEER (OILER)
FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP
FORK LIFTS, (3000 LBS AND OVER)
FORK LIFTS, (UNDER 3000 LBS)
GRADE ENGINEER
GRADECHECKER AND STAKEMAN
GUARDRAIL PUNCH
HOISTS, OUTSIDE (ELEVATORS AND MANLIFTS), AIR TUGGERS
HORIZONTAUDIRECTIONAL DRILL LOCATOR
HORIZONTAUDIRECTIONAL DRILL OPERATOR
HYDRALIFTS/BOOM TRUCKS (10 TON & UNDER)
HYDRALIFTS/BOOM TRUCKS (OVER 10 TON)
LOADERS, OVERHEAD (6 YD UP TO 8 YD)
LOADERS, OVERHEAD (8 YD & OVER)
LOADERS, OVERHEAD (UNDER 6 YD), PLANT FEED
LOCOMOTIVES, ALL
MECHANICS, ALL
MIXERS, ASPHALT PLANT
MOTOR PATROL GRADER (FINISHING)
MOTOR PATROL GRADER (NON-FINISHING)
MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD
OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEED�NG
OPERATOR
PAVEMENT BREAKER
PILEDRIVER (OTHER THAN CRANE MOUNT)
PLANT OILER (ASPHALT, CRUSHER)
POSTHOLE DIGGER, MECHANICAL
POWER PLANT
PUMPS, WATER
QUAD 9, D-10, AND HD-41
$44.92
$45.41
$45.96
$46.53
$42.14
$44.50
$47.09
$44.92
$45.41
$45.96
$45.96
$46.53
$44.92
$44.92
$45.41
$44.50
$44.50
$44.92
$42.14
$44.50
$44.92
$44.50
$42.14
$44.50
$42.14
$44.92
$44.50
$44.50
$44.92
$42.14
$44.50
$45.41
$45.96
$44.92
$44.92
$45.41
$44.92
$44.92
$44.50
$45.41
$42.14
$42.14
$44.92
$44.50
$42.14
$42.14
$42.14
$45.41
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
8L
8L
8L
8L
8L
8L
SL
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
Page 6
KITSAP COUNTY
Effective 08-31-07
*,��********************,�*�********************************************************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING
EQUIP
RIGGER AND BELLMAN
ROLLAGON
ROLLER, OTHER THAN PLANT ROAD MIX
ROLLERS, PLANTMIX OR MULTILIFT MATERIALS
ROTO-MILL, ROTO-GRINDER
SAWS, CONCRETE
SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING
OFF-ROAD EQUIPMENT ( UNDER 45 YD)
SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING
OFF-ROAD EQUIPMENT (45 YD AND OVER)
SCRAPERS, CONCRETE AND CARRY ALL
SCREED MAN
SHOTCRETE GUNITE
SLIPFORM PAVERS
SPREADER, TOPSIDE OPERATOR - BLAW KNOX
SUBGRADE TRIMMER
TOWER BUCKET ELEVATORS
TRACTORS, (75 HP & UNDER )
TRACTORS, (OVER 75 HP)
TRANSFER MATERIAL SERVICE MACHINE
TRANSPORTERS, ALL TRACK OR TRUCK TYPE
TRENCHING MACHINES
TRUCK CRANE OILER/DRIVER ( UNDER 100 TON)
TRUCK CRANE OILER/DRIVER (100 TON & OVER)
TRUCK MOUNT PORTABLE CONVEYER
WHEEL TRACTORS, FARMALL TYPE
YO YO PAY DOZER
POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER
(SEE POWER EQUIPMENT OPERATORS)
POWER LINE CLEARANCE TREE TRIMMERS
JOURNEY LEVELIN CHARGE
SPRAY PERSON
TREE EQUIPMENT OPERATOR
TREE TRIMMER
TREE TRIMMER GROUNDPERSON
REFRIGERATION & AIR CONDITIONING MECHANICS
MECHANIC
RESIDENTIAL BRICK & MARBLE MASONS
JOURNEYLEVEL
RESIDENTIAL CARPENTERS
JOURNEYLEVEL
RESIDENTIAL CEMENT MASONS
JOURNEYLEVEL
RESIDENTIAL DRYWALL TAPERS
JOURNEYLEVEL
RESIDENTIAL ELECTRICIANS
JOURNEYLEVEL
RESIDENTIAL GLAZIERS
JOURNEYLEVEL
RESIDENTIAL INSULATION APPLICATORS
JOURNEYLEVEL
$45.41
$42.14
$45.41
$42.14
$44.50
$44.92
$44.50
$44.92
$45.41
$44.50
$44.92
$42.14
$45.41
$44.92
$44.92
$44.50
$44.50
$44.92
$44.92
$45.41
$44.50
$44.50
$44.92
$44.92
$42.14
$44.92
$35.62 4A
$33.82 4A
$34.27 4A
$31.88 4A
$24.03 4A
$50.22 1 G
$17.04 1
$20.00 1
$30.87 1
$20.00 1
$14.00 1
$28.74
1H
$13.96
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
1T
5D
5D
5D
5D
5D
5D
5D
5D
�
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5D
5A
5A
5A
5A
5A
5A
5G
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
Page 7
KITSAP COUNTY
Effective 08-31-07
********�*�***************���**�*****************�*******************��************************�***�******
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
RESIDENTIAL LABORERS
JOURNEYLEVEL
RESIDENTIAL PAINTERS
JOURNEYLEVEL
RESIDENTIAL PLUMBERS & PIPEFITTERS
JOURNEYLEVEL
RESIDENTIAL SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP)
RESIDENTIAL SOFT FLOOR LAYERS
JOURNEYLEVEL
RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEYLEVEL
RESIDENTIAL TERRAZZO/TILE FINISHERS
JOURNEYLEVEL
ROOFERS
JOURNEYLEVEL
USING IRRITABLE BITUMINOUS MATERIALS
SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP)
SHIPBUILDING & SHIP REPAIR
CARPENTER
ELECTRICIAN
HEAT & FROSTINSULATOR
LABORER
MACHINIST
OPERATOR
PAINTER
PIPEFITTER
RIGGER
SHEET METAL
SHIPFITT'ER
WELDER/BURNER
SIGN MAKERS & INSTALLERS (ELECTRICAL)
JOURNEYLEVEL
SIGN MAKERS & INSTALLERS (NON-ELECTRICAL)
JOURNEYLEVEL
SOFT FLOOR LAYERS
JOURNEYLEVEL
SOLAR CONTROLS FOR WINDOWS
JOURNEYLEVEL
SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEYLEVEL
STAGE RIGGING MECHANICS (NON STRUCTURAL)
JOURNEYLEVEL
SURVEYORS
CHAIN PERSON
INSTRUMENT PERSON
PARTY CHIEF
TELECOMMUNICATION TECHNICIANS
TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL
TELEPHONE LINE CONSTRUCTION - OUTSIDE
CABLE SPLICER
$10.04
$16.21
$21.11
$33.04
$36.08
$30.51
$30.26
$36.78
$39.78
$51.97
$19.29
$25.53
$46.13
$19.64
$19.29
$19.44
$22.24
$19.29
$19.29
$22.21
$19.29
$19.29
$20.58
$9.27
$36.08
$10.31
$54.24
$13.23
$9.35
$11.40
$13.40
$31.15
$30.66
�
1
1
1E
1B
16
1
1R
1R
1E
16
16
1S
1
16
16
1
1B
16
1
16
1B
1
1
16
16
1X
1
1
1
1
1D
26
6L
5A
5C
5A
5A
6L
6W
6W
5J
6W
6W
6W
6W
6W
6W
5A
50
5C
5A
5A
Page 8
b
KITSAP COUNTY
Effective 08-31-07
**�,�*********************************************�*****************************************************,�**
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
HOLE DIGGER/GROUND PERSON $17.19 26 5A
INSTALLER (REPAIRER) $2g.41 2B 5A
JOURNEY LEVEL TELEPHONE LINEPERSON $28.53 26 5A
SPECIAL APPARATUS INSTALLER I $30.66 26 5A
SPECIAL APPARATUS INSTALLER II $30.05 28 5A
TELEPHONE EQUIPMENT OPERATOR (HEAVY) $30.66 2B 5A
TELEPHONE EQUIPMENT OPERATOR (LIGHT) $28.53 26 5A
TELEVISION GROUND PERSON $16.31 26 5A
TELEVISION LINEPERSON/INSTALLER $21.68 26 5A
TELEVISION SYSTEM TECHNICIAN $35.78 26 5A
TELEVISION TECHNICIAN $23.19 2B 5A
TREE TRIMMER $28.53 2B 5A
TERRAZZO WORKERS 8� TILE SETTERS
JOURNEYLEVEL
TILE, MARBLE 8� TERRAZZO FINISHERS
FINISHER
TRAFFIC CONTROL STRIPERS
JOURNEYLEVEL
TRUCK DRIVERS
ASPHALT MIX ( TO 16 YARDS)
ASPHALT MIX (OVER 16 YARDS)
DUMP TRUCK
DUMP TRUCK & TRAILER
OTHER TRUCKS
TRANSIT MIXER
WELL DRILLERS & IRRIGATION PUMP INSTALLERS
IRRIGATION PUMP INSTALLER
OILER
WELL DRILLER
$41.96 1 B
$12.00 1
$36.40 1 K
$41.19 1T
$41.90 1 T
$19.60 1
$19.60 1
$18.37 1
$20.79 1
$13.17 1
$14.08 1
$14.40 1
5A
5A
5D 8L
5D 8L
Page 9