DESIGN/BUILD AGREEMENT BETWEEN
THE CITY OF BREMERTON
AND DILLON WORKS! INC.
FOR
CUSTOM SCULPTURES AT 4 T " & PACIFIC
Based on original concepts by Communication Arts, Inc. and revised fish and man concepts dated November 12, 2009,
Dillon Works, the parties agree on the following:
Scope of Work. Dillon Works will provide all design, labor, materials, and equipment necessary to design, fabricate
and install one (1) pair of sculptures to be displayed outdoors at finro specified locations on opposite street corners at 4tn
& Pacific Streets, in Bremerton, WA. Dillon Works' Scope to include:
1. Design Development (Phase 1)— Based on the concept of one (1) Salmon and one (1) Fisherman, as
reflected in Attachment "A" Dillon Works will provide:
a. Two (2) to three (3) color presentation drawings that will:
i. Further define the.overall look of the Sculptures.
ii. Clarify the position/layout on the street corner.
iii. Further define approximate dimensions of components.
iv. Further define the palate of materials and finishes.
b. One (1) scale model for each sculpture.
2. Engineering and Shop Drawings (Phase 2)— Based on the City's approval of the Design Development
Phase (1 — above), Dillon Works will provide:
a. Detailed shop drawings illustrating fabrication methods, materials, and attachments.
b. Detailed structural design of both the sculptures and footings, stamped/sealed by a structural engineer
licensed in the state of Washington.
c. Upon approval by the City, the Scope of Work shall be fixed and final for purposes of design and
engineering.
3. Fabrication (Phase 3)— Based on the City's review and approval of Engineering and Shop Drawings,
fabrication will commence at which time Dillon Works will provide:
a. Fabrication of the sculptures in accordance with the Engineering and Shop Drawings utilizing the
materials and methods, including attachment methods, all as defined by the Structural Engineer.
4. Delivery and Installation (Phase 4)-- Delivery and installation will commence based upon:
a. The City's review and acceptance, at Dillon Works fabrication site of the fabricated structures and
elements (3.a — above), and
b. Dillon Works conducting a site inspection confirming the installation sites and surrounding areas
necessary for delivery, mobilization and installation are available and ready for installation. Upon
acceptance of the site and surrounding areas, Dillon Works will provide:
i. Delivery of the Sculptures to the installation sites.
ii. One (1) pre-install meeting on site for part of one (1) day.
iii. One (1) site survey for finro (2) persons on site for one (1) day.
iv. One (1) Dillon Works' supervisor and a crew of four (4) on site for three (3) days.
v. Post installation cleanup.
Design/Build Price.
Materials................................................................................................... $ 104,908.00
WA. State sales tax (9.5%) ....................................................................... $ 9,966.00
Labor........................................................................................................ $ 135 126.00
Total .......................................................................................................... $ 250,000.00
Tax. The above-mentioned price includes WA. State sales tax (on materials only), but does not include any other
applicable taxes. Buyer will be responsible for any additional taxes.
Packaging & Shipping. The above-mentioned price includes packaging, and shipping F.O.B. Destination (Bremerton,
WA).
Installation. The above-mentioned price includes installation.
Schedule. See attached CPM.
Terms. Dillon Works will require a signed contract and finrenty-five percent (25%) mobilization payment upon execution
of the contract, a finrenty-five percent (25%) payment upon completion and City approval of Engineering and Shop
Drawings Phase 2, forty percent (40%) upon completion of Fabrication (Phase 3), and prior to shipping, and the
remaining ten percent (10%) net twenty (30) days after completion of Installation (Phase 4).
Exclusions. Excluded from the Scope of Work:
e All taxes, except WA. State sales tax on materials
• Weekend, holiday, and 2nd or 3rd work shifts
• Liquidated damages and/or completion penalties
o Bonds, testing, surveys, and inspections
� Provision of structural footings/cast in place concrete, and foundations
• Flame-retardant materials unless specifically identified in the written scope of work
o All design, provision, and/or installation of lighting, unless specifically identified in the written scope of work
o Traffic control and security during installation
o Any changes to the Scope of Work requested by the City after approval of the Engineering and Shop Drawings
• Concealed, unknown or latent conditions at the installation sites which differ materially from those ordinarily
encountered and that materially hinder or impair performance of mobilization, installation, or storage of
equipment used by Dillon Works! Inc.
General Assumptions:
• Cost is based on one mobilization, 1 st shift, regular work hours
• Temporary power, lighting, water supply and facilities provided by owner
o If Dillon Works! Inc. is delayed in the progress or completion of the work due to any act, occurrence or
condition beyond Dillon Works! Inc.'s control, then the estimated or agreed completion date, if any, shall be
extended for a reasonable period of time. Dillon Works! Inc. shall be entitled to additional compensation for all
costs and expenses occasioned by the delay.
• Temporary and/or winter protection provided by owner
• Clear, continuous and uninterrupted access to all installation sites and surrounding areas required for storage
and mobilization
• Staging area (approximately 50' x 50') provided by owner within immediate area of installation sites for material
& equipment storage
0109-0103.3_db_bremerton public art (4).doc
November 17, 2009
Page 3 of 4
If this project agreement is satisfactory piease sign, date and return it to us.
Upon execution by authorized representatives of Dillon Works! Inc. and the City of Bremerton, this
"Design/Build Agreement" together with its attachments and addenda shall become a binding and
enforceable contract
The undersigned represent that they are the authorized representatives of the parties.
Dillon ks! Inc.
By: B n Leonard, ' tor of les & Marketing
• Date: November 10. 2009
City of Bremerton
By: Date: l� ' ad ' � �
0109-0103.3_db_bremerfon public art (4).doc
November 17, 2009
Page 4 of 4
�,. i a ,......_....
1 Clry of Bnmerbn FauM 6 PaUilc SCUIpWns
-- 2"' Wsipn
3 RsmsE Concept Meeang
4 Gardy'Fnhamun" from Canwpb 2 8 5
5 Bremarton Dea W on Fwhsrman Concep�
6 Finahu Canwpc Dowmenm 8 MaEelc
7 � OeLwrDnvnnpsendMOGbtaCilyoiBnmerton
8 ,.� Bramaroon Cm/ Counal MeeOnp
a s�e�e co�ve�
�o � o.��o.�.io�.m
""_i i " . �e�,.e��9 aeh.w a F.senoa�
iz , Pnydoi Moa.a
73 Shop Dnrtnga
14 Fimsh Sampba
- �s smm�a swowr�i or,�.,�o.
16 Subm�iforPertnit
17 FaCrkatlon
18 S�inlep Fams�
i s n�.mi m.�, va�.is
20 Tsat Frt AcoembLea
21 � SpaqW finishes
22 Pavrc
23 50%Rav�ew
24 100% kewsw/ACOeptanw
25 Srte InepsMOn/COOrdmaton
28 � Ship
27 Impll
28 � PnpctComplete
7N Aaya7 YWtl 77/U09 Frl 6/3lHO i CLLy of Bwnertnn FouM 8 VaeMe SwlpNro �
a� e,y.v NNC 711Y08 WeE tlI4M0 : Du10n � Yl2f
1 day VJad 17/N09 Wetl 11/4/09 i ReWSaL Conupt Maetlnp
7 daya Thu 17/5/08 Fn 11/13N9 I pallfy "Flshermen" from Coneepts I b S
�
3 dayv Mon 11/16�09 NbE 11/18/09 � Bromerfan Daelda on Fla�erman
Sdaya Thu11/1&0.9 VWtl1125/09 FInallzeCOncep[DOeumenl
i Eay+ VWd 1125/09 lAbd 1125/08' Dtllwr DraWnps anU Modals to C
0 dayc VJad 7?/9/09 Wsd 11/9I09 Brem
1 day> VJed 1?/8/09 Wed 11/9/09
zomy. m�iti�aos w.dvs�io
�smy. Tn�iueiros w.airmno
15 Cay� T�u 1?2M09 Wstl 1/73/10
30 tlayc Thu i/7/70 VJSd 7/17/10
I
S days Thu 7/4/10 VJstl ?/10/10 I
ioa,y. rn�vivio w.av2aio�
iomys rn�zrzs�io Watl3/10/10;
60 tlays Thu 1/17H0 W�tl 6H9H0
200ay� Thu3/11/70 Wed4f/HO StalnkssFnmes
30 tlaya Thu 325I70 N/eG 5/5/10 Mahl m�
5 tleys T�u 5/8/10 VJStl 5/77/10
20 tlayc Thu V15/10 VJed 5/1?HO
15daya Thu429H0 Wed5H8H0,
D dayn Thu M15/10 Thu 4/15/70 �
OGaya Wed5H9/10 Nbd&19/10
iGay? Thu5A6H0 ThuS/N10
2daya Fn521/1U Mon52M10�
5 daya Man 524H0 Fn 528/10 �
0 tlays Fn 5/28/10 Fn 528/10
SIT Y
i a;
aria
�
Propct BnmsMn Public Art ScheEWe Taak � Progroaa - Summary ^ EMemal Tasb � DeadLne �
Dab Tus11/70/09 Spl� Milesbm . Pra�ec[Summary ^ ExtemalMilsctone ♦
Page 7
i — oeeign
3 Revised Concspt MeeLng
4 �� ClarAy "Fishertnan" hom Cancepts 2 8 5
5 eremerton Decide on Fisherman Concept
8 Final¢e Concept Documenta 8 Modek
7 Delrver Drevnngs antl Motlels to Ciry of Bremerton
8 .� BremertonCRyCouncilMeeting
9 Si9ne0 ConVact
10 Design Development
1 � Engineenng Review 8 FeeCback
12 '� PhysicalMOEels
13 ShoD Drawings
14 j Fm�sh 6amples
�
75 i Siampea Structurel Dre�nngs
16 SubmittorPermrt
17 FabncKwn
18 SUinless Frames
�79 Metal rtresh panels
20 Specialfinishes
21 TesiFRAzsemblias
22 '� Paint
� 23� 50%Review
I
24 � 100%Rev�ew/ACCeptance
25� Site InapechoNCooMina6on
�
26 Ship
z7 �nstau
28 , Pro�eRCOmplete
73Cry�7 Wed71/IPo9 in7H7H0 Design � 1N2
1 Eay WeC 11/4/09 Wad 11/4N9 RansaA Concapt Meetinp
7 Eays Thu 1 �/5/09 Fn 11/13/09 Clanfy "Fisharman" from Concepts 2 8 5
7 day Mon 11/i6/09 Man 11/18/09 BremeKon DecMpon F�charman
7 days Tue 11/17/U9 Wed 1125/09 Flna6ze Concept Documents
i day� Wed 1125/09 WeE 1125/09 Debver Dnwmpc and Modek to C
7 days Wad 12/9/U9 Thu 12/17/09
1 Aay4 Fn 12/78/09 Fn 72/78/09 ,
15 days Mon 12/21/09 Fn 1/8/'10 i
15 tlays Mon 1!4/10 Fn 122/10 �
15 days Man 12/28/09 Fn 1/15/10
20days Mont/�1/70 Fn2/5/10
5 days Mon 1/25/10 Fn 1/2B/10
10 Oays Mon 7/1/10 Fn 2/12/10
10 tlays Mon 7/15/10 Fn 7C16/10
78 days Mon 1M/10 WeC 4/21/70
23 days Man 3/1/10 We0 3/31/10 Stainless Fnmes �
20 days Thu 3/78/10 Wetl 4/14/10 Metal mesh
15 days Thu 3/25/10 Wed 4/'14/10 ;
5 Cays Thu 4/8/70 Wetl 4/14/10
15 tlays Thu 4/1/10 Wed 421/70
0 tlays Thu 3/25/10 Thu 325/70
0 days Wed 421/10 Wed 421/10
1 day? T�u 4/8/10 Thu 4/8/10
2 days Fn 4/23/10 Mon 426/tU
5 days Mon 426/10 Fn 4/30/10
0 tlays Fn 4/30/10 Fn 4/30/10
Test
50Y. ReWmi� 125
100% Renew/Accephnoa
1/21
Ship B
i�emu o
Prqeet Complete � YSO
Pro�ect Bremerton PuEhc Art Schedule Task � Progresc - Summary ^ E�ctemal Tasks � Deadline �
Date Mon 1123/09 SpIR Milestone � Pro�ect Summary ^ 6clernal Milestone �
Page t
Dec-22-09 10:46A Dillon Works 425 493 8310 P_02
� p� ° - -� _____
� fa�1 � � � �� .,,. , ,.�,- � �. � ; � ,
� �a ` ,� � . .,.,. . �-�
� �� ff �3 ,__y.�""' ' ',t.i�_.....<.._� . "_..,__.,,� j `, , ...,� i�"
q
� �� � �� y, ,� , c v . . � . �, l (
M_ _d ..>...«u,K«m.a«..« '_' ........n,....em���,.____"_'�.._. . .
..a__�...»».«..�<««..e.._. " . _
4 ;�
i
.� ,.�.�,.�,,.,.,ne.�.�v__...._.' _
`m.b.��� � __ f + rw �+ ` � ` .. �'
evs . ;
,�-^�v �•xf«G.c.T� ��`Y..�...A- ��
°".,.. i �v�� -...�� ..-J"`._�,':.,� .�.-..-e=.««,�;:` �
1
t
"`"�� F... .....rao+.rw,..`^a.�.... .�I
P�..�,� �-.,.�-
t° --` ,"°'"'
�� _.1
Ca___.��-� =-�
-.°�' � ''
�-_r ° I
�
�v i
t_.+
� '
r:�
��
�_
�
C
v�
i. -' �
1'"i €
:,1.. �
€
� `1 3
�e �
�.• a
€
� 3
P} (
�� f
� 3
i� �
� g
.__. €
r° �
y � �
� �
I L.i �
. �