HomeMy WebLinkAbout12/02/2009 AGENDA i��� I ��
i� � � � �
I� � �
�
1
QO�rQ (��
i o���0�'
L' "" _____"_ __J
CITY COUNCIL 345 6� Street, Suite 600, Bremerton, WA 98337 ❑ Phone (360) 473-5280
***AMENDED***
DECEMBER 2, 2009
CITY COUNCIL MEETING AGENDA
1. BRI,,,EFI�IG: 5:00 — 5:30 P.M. in COUNCIL CONFERENCE ROOM 603
A. General Council Business
2. CALL TO ORDER: 5:30 P.M. in FIRST FLOOR CHAMBERS
A. Pledge of Allegiance
B. Invocation
3. MAYOR'S REPORT
4. PUBLIC RECOGNITION
5. CONSENT AGENDA
A. Claims 8� Check Register
B. Minutes of Meeting — November 18, 2009
C. Award Contract to CA��orv CARSON CoRPO�TioN for Pre-Purchase of UV System Equipment for
"UV Treatment Facility" Project
D. Award Contract to SCI INFRASTRUCTURE for Construction of "Gorst Sewerage and Septic
Abandonment" Project
6. GENERAL BUSINESS
A. Resolution No. 3103 to assume a portion of indebtedness of the South Kitsap Fire & Rescue
(SKFR) long term debt attributable to those properties within the South Kitsap Industrial Area
(SKIA) annexed to the City of Bremerton
7. PUBLIC HEARINGS
A. Ordinance No. 5097 to adopt Utility Rates and General Facilities Charges; and to amend Chapter
15.06 of the Bremerton Municipal Code (Continued from November 18, 2009...)
B. Final Public Hearing on Ordinance No. 5099 to approve and adopt the 2010 Annual City Budget
8. COUNCIL MEMBER REPORTS
9. ADJOURNMENT,OF CITY COUNCIL BUSINESS,MEETING
� Americans with Disabilities Act (ADA) accommodations provided upon request. Those iequiring specia/ accommodations shou/d
contact the City Cleric's Office at (360) 473-5323 by noon on the Monday preceding the Council meeting.
COUNCIL MEETING SPEAKERS LIST
PLEASE PRINT YOUR NAME BELOW
IF YOU WISIT YOUR COMMENTS TO BE
� NCLUDED I�LTHE ECORD
� � - �Jd
✓
,� ��.�s � �
�/ �� - - ,�
J ��c�nQ c � � c% �
J � L-�r c
� ��� ' �����
REQUESTS FOR INFORMATION MUST BE SUBMITTED IN WRITING TO THE CLERK
THANK YOU
SoulWorks
1900 Naval Ave, Suite212
Bremerton, WA 98312
360-377-0487 or 360-516-8793
SouiWorks is a nonprofit, action based community resource for people in life transitions. Our
first focus is the recovery community.
As a licensed bonded contractor we will partner with individuals and govemment agencies to
do tandscaping in the form of Rain Gardens, we will aiso maintain these ga�dens so they
flourish.
SoulWorks will employ a demographic of people who typically struggle to find employment.
They will be mentored in both life and job skills, increasing their ability to succeed.
Rick is a 33 year otd recovering alcohotic who is struggling to find employment. Due to his past
history af chemical abuse he has a wide gap in his resume. SoulWorks has been designed to
help people like Rick while being beneficial to the community as well as the environment. By
hiring Rick, and his previous work experience in landscaping and carpentry, we are establishing
him as a competent employee. Our business begins to branch out and Rick becomes a mentor
to those coming in behind him and SoulWorks grows. We believe everybody needs and
deserves a second chance.
Our first project is landscaping Bremerton block by btock with Rain Gardens. Rain gardens are
one of the most versatile and effective tools in a new approach to managing storm water called
low impacted development. These gardens soak up and clean runoff water before it reaches
the streets and storm drains: this will greatly reduce flooding and erosion to our streams, lakes
and Puget Sound.
In talking with a member of the City Council we have found that there are no other
organizations of this kind in or community. This is a necessary program that can be modeled
and implemented across the United Sta#es.
�
Page 1 of 2
Lori Smith
From: Lori Smith on behalf of City Council
Sent: Wednesday, December 02, 2009 11:27 AM
To: City Council -
Cc: Carol Etgen
Subject: FW: Citizen Letter - Development around Evergreen Park - Downtown Regional Center Sub Area Plan (for
December 2, 2009 City Council Meeting)
Attn: Counci/ Members
A"Pub/ic Recognition"/etter to consider... Printed copies wi/l be provided foryour packet.
-----Original Message-----
From: John Hayes Larson [mailto:johnhl@seanet.com]
Sent: Tuesday, December 01, 2009 8:33 PM
To: City Council
cc: The Mayor; Andrea Spencer
Subject: December 2, 2009 City Council Meeting: Development around Evergreen Park - Downtown
Regional Center Sub Area Plan
Members of the Bremerton City Council,
I am unable to make the December 2nd, 2009 City Council meeting and provide public comment
before the Council so instead I am submitting this letter. Please have it become a part of the public
record for this City Council meeting.
A proposed project (located on the block bounded by Sheldon Blvd., McKenzie Ave., Cogean Ave.,
and 12th St. directly across the streetfrom Evergreen Park) which is under review by the Department
of Community Development has sparked a discussion by the residents of the Evergreen Park
Neighborhood as what constitutes appropriate scale, density, and impact that proposed projects
should be allowed to have on the surrounding neighborhood. The project as it has been proposed is
out of scale for the neighborhood and would adversely impact not only the neighborhood but also
Evergreen Park.
The scale and density that is called for in the portion of the current Downtown Regional Center Sub
Area Plan that lies north of 11th Street and within the "natural" boundaries of the Evergreen Park
Neighborhood is out of proportion to the rest of this established neighborhood and undermines the
current strong neighborhood identity. One of the basic tenants for successful urban design as put
forth by the national Main Street Association is that: "Strong surrounding neighborhoods are a vital
component of and a necessity for a successful Redevelopment of a Downtown." This weakening the
Evergreen Park neighborhood presents a hindrance to the successfulness of all of the Downtown
Redevelopment.
The above-mentioned proposed project highlights the need to re-examine the assumptions, thought
processes, and conclusions that the Downtown Regional Center Sub Area Plan establishes for the
area north of 11 th Street. During the public input process for this sub-area plan input was obtained
from the neighborhood, with appropriate scale, density, and context sensitivity high on the list of
desirable features. The sub-area plan did not properly address these issues and instead provided
design guidelines that are in part in opposition to them. There is a need to re-examine the sub-area
plan for this area before the proposed project moves forward and a president is set; solidifying the
design guidelines that the sub-area plan establishes.
The positive efforts of the "Friends of Evergreen Park" to further the strengthening of the Evergreen
12/2/2009
Page 2 of 2
Park Neighborhood's identity and their help in charting a positive and desirable direction for their
neighborhood should be applauded. Their call for re-examination of the current design standards set
by the sub area plan and the effects that they would have should be supported.
Their efforts are in line with the City of Bremerton's Comp Plan land use vision: Bremerton is a
metropolitan city that provides for economic vitality and diverse lifestyles. Throughout the city, there
is a broad variety of jobs, housing, transportation options, convenient services, and strategically
dispersed commercial activities. Communities and established neighborhoods within the city each
have a distinctive focus, yet all are walk-able and well connected to each other, including a vibrant
downtown with a mixture of
activities. Accessible waterfronts, water and mountain views, and urban parks add to city's setting
for everyone's enjoyment. New development merges with established styles, protecting the
charming, historical character of the city and its cultural heritage.
And with the goals of the Downtown Regional Center Sub Area Plan on establishing the "appropriate
scale and density" and context sensitivity of projects within established neighborhoods and in
offering the surrounding character of one of Bremerton quality and successful Community Park,
Evergreen.
One issue that the Comp Plan, the Downtown Regional Sub Area Plan, and the Parks, Recreation &
Open Space Plan talks about is a"Park to Park" pedestrian oriented connection between the parks in
the downtown area and Evergreen Park along Pacific Avenue. While this goal is one that is good in
concept and obtainable, the details of what creates this pedestrian oriented connection is where its
successfulness will be determined. If the design standards used to create this connection are out of
scale with the surrounding neighborhoods, the positive experience will be degraded.
Once again, for the area north of 11th Street, the design guidelines that are defined in the Downtown
Regional Center Sub Area Plan needs to be re-examined prior to irreversible harm to the existing
Evergreen Park Neighborhood is permitted to occur.
Thank you for allowing my input on this matter.
jhl
John Hayes Larson
1338 Broadway Ave
Bremerton, WA 98337 .
(360) 373-8634
johnhl@seanet.com
12/2/2009
� ��. ��� � ��,��: i
4 L a: C � �� ��
�s , ,. , ��A_ 1 , �1��� ;� - � r
�S� , . � � ,
,
a ' �,, r� �? � o, D
;� BR'iDGE17 e 4'!V '� a� � `-a ; ��_--_
-�-�r.����' ° ' �t. ��, ,����
�=-- ; _�M ST,.�. ; 4 � � � . � � � � ; i � ,\ ,,, I
r� � � � � . wr��� ���' � ��1 � .
L � i -. �,. . � , (�• �.* � .
���� � � p �' t ;y ``
;�`' W } b ��� � �' ,� � � _-) •C ,1 ��' r �� 1
�(�i� � . � � � � '�. �' -- _ �� �. ',�
W�1 t t �': ' .°s�T
�@� t� � ; �;,2 �
� � �� � ' � � � , � } , �,. e�'.. ,d
tg� � -•- _ � �,� " ;� - " �, - � i{ �
..c � ..�: ' �. �� .A' R � ;r�
�t�H:s _ ;; ' ' � , e
GT ,..
p+ � • � � �ii "1 ` �"� :�`,tr .
.. - ' -� I - ,� ': � - � � � � _ .. i . . • '�y+ ���
.� i ,� . ;r,� � .�,�� v �
' �� � � � , � � - , _ i ., ;� y,�' ' ge 5a ' t.
_ `� � � � " � Z �,_ �. f t �-;� ' �`� r: i :�� � ` S
# (;; �'�` `� j �� �+. :y ��� xt� 4' , - i�A -
_"�°-�.��1� „ .. �I l _ t_ � s'= � j , � . �� ������� .� , �,.
�'�� ��iti.rer .7� r - ',C�' � � �� ,� � Y'
� ��� _, t � ,�..��. " r rt �,,... .�
' � F �� Y i„f � � .1` i � ' � t �i � � .. 1
~ ��` �� + �uS� �..-� � r�� - - ` `�� ' ' i '�`
` r : . a _ - i .-.
��� ` y �_� � , - 4 { r i:�� �, ° ,•! ,� � �"� _
�.+'__ _', ��i�.� a " 7-�� ��.._ b � ' •
4. '� afiFt s. ��, -� �u . ' � 4 �( .
� � r . r Q� ' ' � � K •� � � > ( V , '- � � V „ - . . '� � ��
►,,, �.RW:Pj�r��r. �- , r3 � tt ' `;,,'' V ��i� �^ p �,
1 d ____�u�� I���L:I� I — � �, , �a� + k C ' :
� � i � e ( LC �� V � � ` � � � _ ... t � y , r.� , r '�` , c�
� 0 t��'���, — ., ' � �•, � �. ' �8N`�EL'DON' � �'r . '' .�
}�, �� � � '��1 � � �'�'= ;. � i � � ��.-' ��+ _ , ' S �� �� G, � " �
�� -� � � � � a
� � � 'S`T "L�� _�'�'{; -�_ �ST � � Y ' �� °-- Q ► ` '� 1'
,� � t � A 4 � ��, 4, i � � �
G=� .� ������ • K_ �W� m �..� � �'� ` y ' � R � ^ \ ` � �
° ,,i, tt W ' ` �' �
_ . . �.� � 4 � ,, _ :� Y _.' � : .—� ' �"' � �y �
� � � � �� � - ; ,�- �` u � � ," � � , �' � -.�� � �� � � 1�
�. � ���" �'i �� `, '= ` °' o l.�a � t` � �
' T 'ST� �� � � .,�-,.,----:�_.�, . �.,�__, ' . � �,, _ � ,_,�� � � f � �
'� n ' .;f� � ' S � = �,� _'�'y s�s:�-�♦„- r'}_ � �� LlC1� � � ^� - � �
�.�. - , S o s
1 � 7 1` � �f 1�� �� � � • ��� �"�� � �
E j�n � �� ��� �r � d` � i�7'J$�'�! �
Sentry Dynamics, Inc. and it's
242I N4V 149yhm Itaad Suite 3!m customers make no representations, �, �
Silveraldle, Wr� 98383 warranties or conditions, express or geoAdvantage � �
m�� implied, as to the accuracy or
7��I:36Cl-692-41�1 www_di�ifshare.org 2a8.777.1252
p � j �� ��� ��"� Fdx:3�D-692-�a5b'9 �ompleteness of information contained �
�� Cp �� in this report.
I? www.pnwtkitsaF_cam
v
�
r
— — � — . MAf�n ._"__ r�,' ��JF �s ry� - -5i .:� �
i...i _ i �_."."" � �na�9f•f '3 ' �� ' 3 .i ". � . �� �� / ;�i�s 1�
,r. ! ..:��Jlf'� ! Tf� ..'l r : i iil.^ ..c�i / s� i '����� ♦ ��.��
L� J., � � �' � �� �/�//// � .. .._ . .. ' � � /�// // irs � • ....� — . .. � �
�;�� - r �,�'�' -� � � � g°� �CCCO��i��r�iea
��i�aa �nni� har�i �` ni�������.�..r6 T�O�� � � P„�i�i�. '..... ' . .., ' �
—.� '__ � ii �� �.4 i/ I � I �
�'�"'�-� o -- - a s -� � �a I .�—=- �`� � r� ii �x ±_ .i ='�,_ : �• _ '
�=la� � � � i����Q1lvi -e a'a�wsa•u�e ��s� i
b � � � ��, ���� �r , �..r..s � � B��i �_ae F..! �11 r !�� � ■ 6 D'nim��; I
�.�lN �U�l�; ��\�, � 111 If3���.�� ���_� �3Fauaa �11#������� ile�� �
��r.:; � �� � ��� ' � � � �,:� �i■1= ��%� �
'� � � �a � � .�.n
�i��� ' �ur o�,� �u� ��� Itil�n �', � � �ftll � '
'���_ ����1�9:�1 � � '� � t * a ��1 �/.� ! � �� � ,� .i �i � � � I� � emunuun'
f , I f�ifl ■IIII I
i.....o ..............,.,.,,,,.,,,,.,,,.,,,,.,,,,� � „���„�,� x ,,,,,���„r�r�,��! �,.�.. _ 1_i_ _h�_ ��u���u�u���
I ��. � . � �� +�! � � � ' '
��ii�l_ "��J �5'L'� �� l�� �' �i��e l �cra� I��o f�arsu ��'' t ll� � 0 II� �(
.�"�w,'oi'�,.�', +3,�'�!i! `i'- x� sa�w�,r��� i i f ��ic _aM. ne �+' �,E�
s. ,.. , .. � i r� �.� �iE!
��������'�v .���I�LI�l..� i�'{�� �-'~.� �' ' � - -
� '� � ��M�������e�!�_)��� �, ���'
o _- - - _ __ _ _ _
.
� -
� "o
,_ � .
� '
_. � .
�
o - ; o
� .
0
; �-� � - -- - —
�:i�.� � � a�a�'� �i i��: � i � io �ai -- - --- --- -- - — -
r" C � �: :��tl��l���,��3=�Qte`�i ��. '��`�������
. , . -�.� ���1���_1 e � r�f � �'�'we -
ia e �_" ��'�� �.'1�' �,' \■� ,� ��� - -
�s. �- Io� ��., �� ����.���" � w�at���l ���■ �1�� � �
, � � � � .:: oa �'�I���� I�i�l�� �i� ��"����� ���n�� .,� _ -
a i'i�.� .� i� � e �� �= �o� �. :
. ,; � _lwu ■.:: �.. � : ���■.. _� �■.■ 1��1'° �
� ��.i �� �e■ i�u � �_ �n� _
■� e ws� �_ ' �d, e�e�'°�,���I�f�..��lU�:.���' _ � ��
!!'-e�� ■������ -
6 ' I'�. �` I .
����.��; �li �ss'
, �
Q - - � —
.�
'�
.�.
� ;'
�, � �
���„�- `a.�--r`�`;�v.. . ,' ,��
. �. ,: . .
, .
� - �`�.
i � .,. , -- �,
.�� — � f, . • F ,,,;,
� ,.� ' . �� . :. : l ' .. .� . .
� .. • 1 � •
4 � r
�� � + +2, fl) � ' ��� 'rF
,
;
� � r ' � i NidtYii� �I sa .r _;>i � fi �'}� '
.
_ � -' �; `i .t':i,if1 � � t�' p:.
�i�uc�' � + � t ,+` ' ! - ' � ;' � �.
_ ,
���: �. ,+t�t�4,. .; f ��,,�. � �i.i1��� ���
,�` f ,�:+�� ��,� ,��i u •�► .--.� �
;� � ; l_;�� `, �.,� �'��.,r� �, ' I � � � ""`''..._.�''` ,�� � ,�. - y � — ,, . � `�� .�,
' �t"Y..�:P �" S.S %f:. � , ����l�;..`r"�C �— � F .. . ` � � 1 �n • ry{ L �
`� ---�-1qC.� � � f*F�.. . �`� . .: �.. . • ,� ' ,.� � . �.� •R\ ��, � ,.r � � .? ��� \� . ' ��'''�+
K n
��� £ :: a �*�.' t 3 � 4 .. .__.� r .. : �'. . 1 r u i .i : r� � �� � �- N T�`Z`i r, � � �h. t � .� �i�, . fN
f � � � ..-�__._,,.-... S '� `3" .z 'q'� �,� '� � � . N r I '���� � � � ��_3✓ �� \
,-;� r . I � . tl# .. �, "f'G��' + � � ,�' r a � �� . 7 � � �: { �`� . j,�
i ' . t ) �l,! ...yF„_ �...:._..,s.�,_,. y„Yj, . iC • ti�i ' , i .' � Y i � ':r� � n � i � �.; �M
. � t,♦ a � � t t.� �� .';y' ■
�[1P t� .1 �.A y ..�- 'N•, � �� !
-�.-�� .�;� �.. �., - 1, r � ��,
, ���
,� �. .
�.
. _ .�::
i
.nr
.. -� �� �.:r,
s.-� �, y •� !
`. � �_..� .-...' - ... . . . . . .. . � . ,, � ''� �
. L. ,_ . . •. .-:.:,...�. � r...y:. '� ' ... .. �
� y ��
.
�� . _ . '. ` . . ���
' ���.. ... . .• .. �� : s . 7•�
' � �•
a' �
. .� ,���,
— �r
,. . .
;�•, ;t" � ! i:r1
7 '�
� ,
� � � : '' �'� �''
, , �•,. . � � _ f
__ .._ - �
... . . .. . � A ��� ��p � :'.
�'��: t
`�- `� -- —� ---__... . F ` � � y �� �c.... . t r�' :' �i:r �x". "� ;1 � � t . �
, 4 ����
s+.,��.... � y � �� �:�,�, � � � ..�---'- � -- �- �� �- ��++*�� � � .,�: �'�'� Q �• � . - .
� � _� � �
'k t � � i �,�' � �' ._ _. .... �y ,'.
.� Y+e 1 . ��K�� � J'�' s � �, M �.7�, J
� � _ i � �� ��w� �..��. x �
� � . � . ..� � . �, �
'} " 1 �: �,�' 1����-, — '� � 1 1 I I I I I I! I I I I ��:,.GF � '���'�`�� � ( t
� ': ; ; � � � � � i � � � (. _—�—� ; I i I �. a � � I i I I I I I I 1 � ! (,_:.. :..� • � :� �� , � -..; �.s�..e.. r , ,� ��`!�`
s ..e Y
r�. �, , �- ,,.,�..�-----:_.-. , 'h i+e , r� • � r .
,. � ..-,—..----�^ _,R r �� - �?' } t ,y�^ i"r'y,q'4- }nr�+ �, t£'.
. ,Ft'��.i.---^ , '!� �ir's'r ! �- S'�t`�" y r- „6� � ' '. � `t
�� ' ,,,.,1 i..._�..+1�-'+• � % � / . �� . � e !�' � � +Y 'i" .:� � t '�± ��M- �I�'t �
. �
. . ." ;R ' a' ."' r-'+ . U � � �, r a >, , • � z t . �'"}" �. � 5 � � � � y �'�
�� � � / . f, � Ti-"'_� ,.r 'r a,,,.t�.fi `'Si,� '� a Sx , �` 1
~� r i ' �> a4 t � : • . i £.� , � f ,� r . ty .. �� . i
. ..
"��' : 1 ,�,, Ss , ��+ 'i i „i �.) f ; y w - trp - �L-' K ^�c -. i: u • ' l„ `,,
� } ,� * �
, .
���,cKC +.� �� � ' � .j . �!"{� r +'E' Y ; � t '� a „ y=^ j,r q'+ { F } y �,
j , �
.L �. :.l,;�(��, �. � .i��•:�� � /!/! /�� nYf* � YY�I. r^� .�� R 1,,.k - ur ._._ � ;t r :1�
i� }
� f ��. � y . .., , . t , ,'. �7 f `}� � ' r r X r . ' . �. � ` � � •, �,:,�
, : ;:
;: • . `
_ ... ..: ., ,, `� � � �
��.(� i
�ti�'. .iti �"'�.��.�,+fi �.-t. �. I �',�;,::,' 1�( . b'r�"�' 4�s .�♦ , - S � , ��1��� 3.'.- � ��, ,1� _ .:
�` � �`r�. �' _� .�� ±, .s�.... , . ' Y =��. �!`"-�� . � 4r�Y �}�a ;� .� ��.� � �e' 1 v '
� n.f'L-,' "�'�'� i�.'� " �� ' -�,F �, 2` '• :." w �.� 4 •,', �. . ( �I��i�Ri �.�� I i
�! ��.Ss�t�,.�2'Yc - 1_� _ e � Y�.y_YilYVX!if.!+.�r�f�������•y�{!:.
�
�
�� �
�� °� �:
f�
f'
d
0
--�` ��� ZI � �00�� �,� Sot.���
�y
� � ��' ,f..,,
,. ,
����-_ _.. . �.
��� r�`x
�
� �`�/�' ` ��� � _'�a,��u�`''^s:w.. " !"
�.�j n
{ `�"' }M��"' 71l' . �.. � .. �� t ,i 3`,A .°aMf7 �,yT�, m
7 „7 ' % �� r .=<. } fr �:..:� +..: ' . � , �.��..iei��t' �
� �"�S . ?Y .1 v 4 � �
� t Y ",v_. a-r ..
rr ����� x ��$� � '�,� ��.:� A '"` �' ri
��`� } � y � � � . . . . ..C��:; �
'1�i���fl1 ' T��a° � �-'�.� Q`'`'_�-'.
� . .:�� *-.I � �. � � '"`'--...� 9
_����� "� ..� C
ti� - r� �1�� �'�����;,�.� �:.•..,�'.
7 � �� .� r �-
�� :.. ! R, +� �' _ �` � -.�
: � ..t � ��.. M� � ``' � � " � M � _c
;�E Y � r �`� � r' I z ys �.� ;���:i� � :��r.. -
� , f ,r. "�M. _ .��� �' ��', �-� ?' � T,J �_"�. �� ��: -'-
. , T .' _ :.'.
i..Y�` ,; �� '� ,. � (r�rYr l i� ��r i . � � Y � a :� � , , . :.
M ,,a + � `r ,x,,. ' r � w s �= F..._"^ei��`-r' � �'v.
� � � �1 ? q � � ''��' � - - � ` �� j � '� � :� -+- � �r-- , :� -�c----�-ra "_ � -\
� � - � •-,r- N z.-� �w','��k� -� y '-r�-'� x ',\
'Sc .i. � - � � = � . s+. � � s � " .. : t►.� . =.;.iC:.:"".' ;, "„ .3': '_.t'.y : . y�-� - ���.
'�- . . �- x"''�s� rit- , .� ^ .A. ��a� - :.sse-. t �+ _ ;. t� .-- - - ' . - aa�"-'�"'� `'""� + "`' �"".�'. � � �
� ; .�� � "�"��x'±�'. '� ,,- _ _ _ _. �
'�� �x�� _,,�•.�I •.,, t ii 1 ''
.. �- �t*.,.��s�s� .�..i.x.�.:�y,i, 'i��
,t :c'. � ...�u�w�. : � ,
, , . �►,�_ =--�-- - :�, �^�� , ;
� �y : J. '''#
— ' �;_'1 INU! � i.d � f {�a' ' 4 �
�� �? r.�+��� . ' .�' �rii �� *'' 1 s - _ �)
' C�i .._„ �� ��' . '.'� �� ..SX, ,:
,:
, • ...: . ,:
� , ... '. � �
: .
;
U} ° �'_:'�,� �, ,� �
. � _ '� : � :,.; j- � � ,
�
�
/
�.. j ji
4
1 `1
�� /
�
� � /
,`
�
� �� �
J
� I ��� ' , � �,� ♦
� ,'
♦ � I` � ` '��i � � . .� ,`.
t�. � �� + ���i� � ���.. �
� T., � , : ` ";• � ��y. �j �"�..�.�
� � � ��-
� .� ! I _;� �t��7��t.`.� � ��� ` Y it � y ii -' - ����! �. � �� i��
aY �� � � �f�t y��� �, �i.. , ��r}�i�I .:A��.� ��. �� .��v" - �lE
�1 � ��'� T �� `•�� .� . �����
1, �,�� ���� ��; �^
�`. - ��; r �`'�.���'_'* _� -�_.�� ��r, ;._�_ ..�i`�
�. :. #. � � ' l �� � , �,� � - . p .
�+�. . y � .,: idi��le�-.L7�+� �.3,. � :=:_� � '. _ � .� �� .'" ' . ..�._�
t �'�
� i � �� f u• � r� i'' � y�h�, v F�'t t'� �'�'�` "' 11� yw. � F__,.,�.-
� �f '• �` A �:�� � ,:� ' �.� � _ -
1� '' �'�tj t�` ,'�s s .•, � - -� �` .
- � y, �.CS3 � � � _p��t' :.i► :i „ ,. io
L
� � .. * T;j^ � _-- _. -
� � ...;i• � � ..."� F+�� � ��
"" -��^ � �c J�i.+ ,2 � yr. �.. . �
,
� �t. as :�Y..1 ._ .
: -
. .;. �
. . _ �..-... ; i -�r , .
r J , :,...
�`; J �
..�.
DATE SUBMITTED: 12/2l2009
AGENDA BILL
CITY OF BREMERTON
CITY COUNCII.
...................................................................,........................�
SUBJECT• Committee Meeting Date: �
� COUNCIL MEETING Date: December 2, 2009
Claims & Check Register Department: Financial Services
Presenter: Cathy Johnson
Phone: 473-5296
SUMMARY:
Consent Agenda item. Approval of checks and electronic fund transfers.
ATTACHMENTS: Check Register.
F'ISCAL IlVIPACTS (Include Budgeted Amount):
APPROVALS:
DEPARTMENT DIRECTOR:
CITY ATTORNEY:
FINANCE DIRECTOR:
MAYOR:
COMI��IITTEE CHAIR
COUNCIL PRESIDENT: �2!�`� CONSENT AGENDA �
���ss ��t
-- -----------
----- - - ------ -GE��. B�snvESS-Q- --- ---
PUBLIC HEARIlVG ❑
RECOMMENDED MOTION:
1) Check #'s 334828 through 335058 and EFT's 9327 through 9384 in the amount of $2,447,155.25.
2) Retiree Payroll for the pay period ending November 30, 2009 in the amount of $78,887.77.
COiJNCIL ACTION: � Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
i�:� i i�. �t i��ti i ri�i�: !.7
.�c:H:vn:� �3�t.i.
�
('I"I�ti' OI� E3RI:ti1l:R"1'Oti
C'1T1' C'O[.!\('IL
.......................................................................................�
ti�'[3JECT: C'ity ('uunril �lc�tin3 �tii�ut�s C'uinmitt�c �9��tin� Datc: ti;:�
tur m��tin� uf� (��)Uyc'll. �11•:L• f(ti(� I)atr: "pe,C�yy�,l 2� �oo q
N�v�Y�(1,�0�1'" � g� 2C�09 D�partmcnt: _('itv C'ouncil
Pr�scntcr: C'ccil McConnclt
Cuuncil President
I'h��nt: �36U) �t73-�280
Sl,'i�I�Vi�RY: Attached is a summary of the City Coiincil Niectin� liel� �OV �kv��oeY' �$� 2° o�'
ATTACHNIENTS: Meeting Minutes for NaV ��Vt�o� .� 8 ��. 00 �
F[SCAL IMPACTS (Include Budgeted Amount): N/A
APPROVALS: ._
DEPARTMENT DIRECTOR: Council President
C[TY ATTORNEY: N/A
FINANCE DIRECTOR: N/A
MAYOR: N/A
COMMITTEE CHAIR N/A
C'OUNC'1L PRESIDENT: �� , ` r ,_ CONSENT AGENDA [�
c ti� ► l
GENERAL BUSINESS ❑
Pl�F3LIC HEAR(NG ❑
RECOl�1�lENDF.D 1-IOTION: Ylovc to cipprove thc C'unscnt ����n�l<<.�s ��res�nt��i.
('Ol!ti('IL A('T'ION: ❑ Ap}�rove ❑ I)rny ❑ 'fahlr ❑ ('unt�nuc ❑ Nu .1�hon
DIGITAL RECORDING
CITY COUNCIL MEETING MINUTES
Wednesday, November 18, 2009
The weekly meeting of the City Council of the City of Bremerton was called to order Wednesday,
November 18, 2009, at 5:00 PM in Council Conference Room 603 of the NoRM DiCKs
GOVERNMENT CENTER 345 6 Street, Bremerton, Washington, with Council President Cecil
McConnell presiding. Council Members present were Nick Wofford, Will Maupin, Carol Arends,
Dianne Robinson, Mike Shepherd, Roy Runyon, Adam Brockus, and Brad Gehring. Also present
were City Attorney Roger Lubovich, City Clerk Carol Etgen, and Council Assistant Christine
Grenier.
A COUNCIL BRIEFtNG was held to discuss General Council Business and at 5:30 PM the meeting
moved to the First Floor Meeting Chambers.
The Pledge of Allegiance was led by Council Member Brad Gehrins� followed by the invocation
provided by Reverend Paul Meeker of Our Saviour's Lutheran Church.
MAYOR'S REPORT — There was no Mayor's Report tonight...
PUBLIC RECOGNITION
A group of citizens organized to form a group called "Friends of Evergreen Park" and were in
attendance to express their concems about a planned condo and commercial project near
Evergreen Rotary Park:
Raven Ravne read a letter in opposition to the proposed project.
David Mercer expressed specific concerns over the height and scale of the proposed condo which
would directly impact the character of the neighborhood and increase traffic significantly; and
hoped that the new mayor would pay close attention to this matter.
Catherine Pervus commented that the city does not need additional rental housing and also
questioned whether Evergreen Park was an appropriate location for approximately 100 more units.
Tim Henkel pointed out that views from his rental property will be completely blocked by the
proposed project and believed that this project will ruin the entire neighborhood.
Sue Wells was very concerned about the size of the p�oject and the potentially huge impact on
traffic with the influx of new tenants.
Lisa Lawrence emphasized that Evergreen Park may be part of the Downtown Area Sub Area, it
is a different neighborhood, and the proposed project does not fit into the character of that
neighborhood; and requested that Council take a closer look at density, character, and traffic
issues.
Chris Nordleaf, Downtown Bremerton Association, thanked Mike Shepherd, Roy Runyon and the
Bremerton Fire Department for their help at the Downtown Trick or Treat event on Halloween.
CONSENT AGENDA
A. Check Numbers 334618 through 33487; and EFT-9288 through EFT-9326 in the amount of
$2,155,543.05; Regular Payroll in the amount of $746,168.35 for the pay period ending
November 15, 2009; and Retiree Payroll in the amount of -($147.89) for the pay period ending
October 31, 2009
B. Minutes of Meeting — November 4, 2009
C. Minutes of Study Session — November 10, 2009
D. Reappointment of M. Blair Schuetr to the Arts Commission
E. Reappointment of Deborah Woolston to the Arts Commission
City Council Reg. Mtg. Minutes
Wednesday, November 18, 2009
Page 2 of 7
F. Intergovernmental Cooperative Purchasing Agreement with Kitsap County
G. Interlocal Agreement between the City of Bremerton and South Kitsap Fire & Rescue_
regarding EMS and Fire Protection Services to South Kitsap Industrial Area (SKIA)
H. Award Contract to HOS BROTHERS CONSTRUCTION Irvc. for Site Preparation for "UV Treatment
Facility" Project
There were no questions or comments from the public...
05:52:55 M/S/C/U (Runyon/Arends) Move to approve the CotvsEtvT AGErvoA as presented.
GENERAL BUSINESS
6A — AWARD CONTRACT TO ROGNLIN'S FOR CONSTRUCTION OF "GORST SEWERAGE
PROJECT PUMP STATIONS SB-3 AND SB-4": Michael Mecham, City Engineer, summarized
that 5 sealed bids for construction of the project titled "Gorst Sewerage Project Pump Station SB-3
and SB-4" were opened on November 5, 2009 and ROGNLIN was the lowest responsive bidder
with a bid of $2,251,278.00 (including sales tax). The City Engineer's estimate for the contract
was $2,177,844.00 (including sales tax).
There were no questions or comments from the public...
05:55:39 The Main Motion was made and seconded, as discussion was opened to the Council...
05:57:11 M/S/C/U (Brockus/Wofford) Move to award a contract in the amount of $2,251,278
(including sales tax) to RoGNUN's for construction of the project titled "Gorst Sewerage Project
Pump Station SB-3 and SB-4"; and authorize the Mayor to finalize and execute the agreement with
substantially the same terms and conditions as presented, contingent upon the execution of the
ARRA loan agreements.
PUBLIC HEARINGS
7A — 2 PUBLIC HEARING FOR LEASE AGREEMENT WITH KITSAP COMMUNITY
RESOURCES (KCR) FOR PARKING ON SMITH SCHOOL PROPERTY: Wvn Birkenthal, Parks
8� Recreation Director, explained that Kitsap Community Resources (KCR) operates Head Start,
Child Development, and Veterans Assistance programs at the former Smith School Building, and
that off-street parking for participants is in short supply leading to overFlow parking and congestion
on Elizabeth and Park Avenues. The attached agreement allows KCR to make use of an
abandoned City-owned tennis court located east of the Smith School building to provide
approximately 12 additional parking spaces for program clients. In return for use of the property
KCR will assume responsibility for the day to day landscape maintenance of the Smith School
neighborhood park. This item was unanimously recommended by the Parks & Recreation
Commission at their August meeting. Mr. Birkenthal added that the agreement includes a five-
year term and any future renewal would have to be reviewed by the Parks & Recreation
Commission, fully recommended to Council, and then followed by Council action.
President McConne/l stated that the first Public Hearing was held on November 4, 2009; and
then opened the Public Hearing for comments...
Larrv Ever, Kitsap Community Resources, clari�ed that a pervious surface is intended for the
parking area that is mentioned in the agreement.
Presldent McConne/l stated that with no further comments, the Public Hearing was now closed to
the public...
06:00:41 The Main Motion was made and seconded, as discussion was opened to the Council...
City Council Reg. Mtg. Minutes
Wednesday, November 18, 2009
Page 3 of 7
Mr. Shepherd reiterated several concerns, and particularly did not like the idea of trading park
property for a parking lot; would like to see underutilized park property converted back to park use;
would also like to see a rain garden added; and was pleased with the potential use of pervious
surfaces to address the stormwater issue.
Mr. Gehrins� thanked Larry Eyer for considering the use of pervious pavement.
Mr. Runvon believed that this is a good use of limited space which will meet the needs of the
clients at Kitsap Community Resources.
06:04:42 M/S/C/U (Shepherd/Runyon) Move to authorize the Mayor to enter into the Smith School
Parking Agreement with Kitsap Community Resources (KCR) as amended; and execute the
agreement with substantially the same terms and conditions as presented.
7B — FIRST PUBLIC HEARING TO APPROVE AND ADOPT THE 2010 ANNUAL CITY BUDGET:
Andv Parks, Finance Director, explained that per RCW 35.33.057, public hearings are required to
present the budget, and that the City Council has held Budget Workshops on November 5,
November 9, and November 10; and a final public hearing is scheduled on December 2, 2009. He
provided a Power Point � presentation outlining the process used to prepare the budget,
summarized staffing levels by department, and discussed how economic recovery and related
revenue may factor into future budgets.
President McConnell opened the Public Hearing for comments. ..
Chris Nordleaf encouraged the City to tighten its budget the way residents do.
John Thomas expressed concerns about raising utility rates for the wrong reasons at the wrong
time.
President McConnell stated that with no further comments, the Public Hearing was now closed to
the public as discussion was opened to the Council...
Mr. Sheqherd reiterated that he has received concerns from citizens regarding utility rates, and
likened the use of Real Estate Excise Tax (REET) to "payday loans".
Mr. Runvon encouraged people to share their ideas on areas where the city could make cuts, and
generate revenue without impacting core services; and added that there are special utility rates
available to assist elderly, low income, or disabled residents.
Mr. Gehrin� stated that personnel costs, equipment replacement, and unfunded mandates have
all raised the cost of business.
Mr. Maua�n asked for clari�cation on the REET issue; and spending reductions. Mr. Parks
responded that REET is being used to leverage significant funding from othe� sources with a
repayment plan over the course of 20 years. He then discussed the process that management
went through to cut spending which included labor union negotiations for reduced salaries through
reduced hours, and early separation or retirement. This process was coupled with an aggressive
pursuit of grants with emphasis on non-matching funding opportunities.
6:48:10 No action is required until the second public hearing scheduled for December 2, 2009.
7C — PUBLIC HEARING ON REVENUE SOURCES FOR THE 2010 ANNUAL CITY BUDGET.
WHICH INCLUDES ITEMS 7C11) THROUGH 7C(51: Andv Parks, Finance Director, explained
that RCW 84.55.120 requires a public hearing on revenue sources for the following year's expense
budget. The public hearing must include consideration of the possible increases in property tax
C+ty Council Reg. Mtg. Minutes
Wednesday, November 18, 2009
Page 4 of 7
and revenues, and shall be held prior to the time the City levies the taxes or makes the request to
have the taxes levied. Separate agenda biils are provided for each of the 5 action items 7C(1)
through 7C(2):
President McConnell opened the Public Hearing for comments on all five items...
President McConnell stated that with no further comments, the Public Hearing was now closed to
the public as discussion was opened to the Council on all five items...
(1) ORDINANCE NO. 5095 TO UPDATE RATES AND FEES FOR 2010: AND TO AMEND
CHAPTER 3.01 OF THE BREMERTON MUNICIPAL CODE IBMC):
In conjunction with preparation of the 2010 Proposed City Budget, the administration is
recommending that certain fees and rates found in Chapter 3.01 Rate Tables be amended,
specifically Rate Table E-"Fire DepartmenY' to modify and increase the ambulance
transport fees and increase the fire watch fees; and Rate Table F-"Parks 8 Recreation
Department" to increase some fees for facility rental rates, use of park facilities and athletic
�elds, adult and youth programs, the Ivy Green Cemetery, and establishes new fee
categories for Gold Mountain Golf Course.
06:56:15 M/S/C/U (Runyon/Shepherd) Move to approve Ordinance No. 5095 amending
Chapter 3.01 of the Bremerton Municipal Code (BMC) updating Rates & Fees for 2010.
(2) ORDINANCE NO. 5096 AMENDING CHAPTER 3.50 OF THE BREMERTON MUNICIPAL
CODE (BMC) RELATING TO UTILITY TAXES FOR WATER, WASTEWATER. AND
STORMWATER UTILITIES (ADDITIONAL PAYMENT /N L/EU OF TAX tPILOn FEE TO
PROVIDE ADDITIONAL FUND/NG TO THE ClTY'S GENERAL FUND):
Current economic conditions have resulted in significantly reduced revenue to the City .
General Fund beginning in late 2008 and continuing throughout 2009; and projected to
continue through 2010. To provide additional funding to maintain City service levels at
minimum levels committed to through various outside grants and local vater approved
property tax increases (EMS Levy) a non permanent additional PILOT of six percent (6%)
is included in the proposed 2010 General Fund Budget and Utility Budgets.
06:57:07 The Main Motion was made (Runyon] and seconded (Brockus], as discussion
was opened to the Council...
Mr. Sheaherd commented that he believes public involvement has been too limited.
Mr. Mauain pointed out that $11-million in ARRA funds has been made available to the
City for funding utility projects which will benefit all residents of Bremerton; which is one
argument to justify giving some of the money back to the General Fund.
Mr. Runvon asked what is the impact of not adding the 6% PILOT on the City's utilities.
Mr. Parks summarized that $2 to 4 million or approximately 20 public safety employees
would have to be cut to find the same savings.
Mr. Gehrins� reminded that Council that language in the ordinance states that "it is the
intent of the City Council that as economic conditions improve and/or the City identi�es
altemative revenue sources the additional utility taxes provided in this ordinance are to be
reduced and/or eliminated". . .
07:04:34 M/S/C (Runyon/Brockus) Move to approve Ordinance No. 5096 amending
Chapter 3.50 of the Bremerton Municipal Code (BMC) re(ating to Utility Taxes for Water,
Wastewater, Stormwater Utilities.
City Council Reg. Mtg. Minutes
Wednesday, November 18, 2009
Page 5 of 7
Voted in favor of Motion: Maupin, Wofford, Gehring, Brockus, Runyon, McConnell
Voted opposed to Motion: Robinson, Arends, Shepherd
Motion carried: 6-Yes; 3-No
(3) ORDINANCE NO. 5097 TO ADOPT UTILITY RATES AND GENERAL FACILITIES
CHARGES: AND TO AMEND CHAPTER 15.06 OF THE BREMERTON MUNICIPAL
CODE IBMC1:
The proposed ordinance amends Appendix A of Section 15.06.015 of the Bremerton
Municipal Code (BMC) relating to assessments, rates, fees, and charges for municipal
water, wastewater, and stormwater services by establishing new rates for all categories to
implement a 3% rate increase effective January 1, 2010, and an additional 3% rate
increase effective July 1, 2010.
07:05:10 Main Motion to approve Ordinance No. 5097 adopting new utility rates effective
January 9, 2010 and July 1, 2010, and amending Chapter 15.06 of fhe 6remerton
Municipa! Code (BMC)was made (WoffordJ and Seconded (MaupinJ as discussion was
opened to the Council...
Mr. Sheaherd explained that this rate increase is specifically to adapt to the taxes that
were just raised with the PILOT to generate more revenue for the General Fund and the
citizens have no option but to live with it. He did not think this plan was going to be
effe�tive and did not support further increases which would make Bremerton a less
attractive place to live.
Mr. Wofford respectfully disagreed with Mr. Shepherd, and clarified the money is not going
to the General Fund but to the Enterprise Funds (Utilities) that include Water, Stormwater,
and Sewer because utilities are very expensive projects to maintain and improve. He �
further commented that after discussions with Mayor-elect Patty Lent, she stated that she
has some ideas and would like some time to do a little research and therefore he would like
to make a motion to continue action until the next Council Meeting on December 2.
07:10:30 Motion to Continue was made (WoffordJ and seconded (Maupin] as discussion by
the Council continued...
Mr. Runvon agreed that it was very expensive to run utilities, but disagreed with Mr.
Wofford and stated that part of the 3% rate increase is to help the Utilities recoup the
PILOT and believed it was important to be up front about it. He would like to hear
alternatives to increasing the PILOT.
Mr. Mauain hates the idea of raising utitity rates however pointed out that previous
Administrations refused to raise rates and therefore ran the utilities into deep debt; and
over $50-million was spent in the last 10 to 20-years separating sewer and stormwater.
The good news is that the water quality in Puget Sound around Bremerton is much better.
Mr. Gehrins� does not like the idea of raising taxes but reiterated that compliance costs
have increased and even with grant funding, there is a need to support utilities.
Mr. Runvon asked who qualifies for low income assistance for utility bills. Mr. Williams
answered that the program would be run through Kitsap Community Resources and federal
guidelines would need to be met for low income elderly and disabled individuals.
07:21:57 M-Continue/S/C/ (Wofford/Maupin) Move to Continue Ordinance No. 5097 to the
Council Meeting on December 2, 2009.
City Council Reg. Mtg. Minutes
Wednesday, November 18, 2009
Page 6 of 7
Voted in favor of Motion: Arends, Maupin, Wofford, Gehring, Runyon, Shepherd, Robinson,
and McConnell
Voted opposed to Motion: Brockus
Motion to Continue Carried: 8-Yes; 1-No
(4) RESOLUTION NO. 3102 MAKING A DECLARATION OF SUBSTANTIAL NEED FOR
PURPOSES OF SETTING THE LIMIT INCREASE AT 1°k FOR 2010 PROPERTY TAX
LEVY
RCW 84.55.010 provides that a taxing jurisdiction may levy taxes in an amount no more
than the limit factor multiplied by the highest levy of the most recent three years plus
additional amounts resulting from new construction and improvements to property, and any
increases in the value of state-assessed utility property.
RCW 84.55.005(2)(c) allows for the taxing jurisdiction with a population of 10,000 or over to
use a limit factor as the lesser of 101 percent or 100 percent plus inflation. CuRently the
taxes levied in the City of Bremerton in 2009 for collection in 2010 will decrease except for
the amounts resulting from new construction and improvement to property, and any
increase in the value of state-assessed utility property.
RCW 84.55.010 provides fo� use of a limit factor of 101 percent or less with a finding of
substantiat need by a majority plus one vote of Council Members. The City General Fund
revenues are decreased from 2008 for the second consecutive year. The additional
property tax authority will provide funding to be used for public safety, street maintenance,
� and preservation of the City's other basic core services.
07:22:44 M/S/C (Brockus/Runyon) Move to pass Resolution No. 3102 making a
Declaration of Substantial Need for purposes of Setting the Levy Limit Increase at 1% for
2010. �
Voted in favor of Motion: Maupin, Wofford, Gehring, Brockus, Runyon, Shepherd, Arends,
and McConnell
Voted opposed to Motion: Robinson
Motion Carried: 8-Yes; 1-No
(5) ORDINANCE NO. 5098 ESTABLISHING THE PROPERTY TAX LEVY FOR
COLLECTION IN 2010
The City's property taxes are levied on an annual basis through passage of an ordinance.
The proposed ordinance will implement a general property tax levy and a voted EMS levy
at the statutory rate limit as well as a bond redemption levy at a rate adequate to provide
funds necessary to meet debt service obligations.
7:23:38 M/S/C (Runyon/Brockus) Move to approve Ordinance No. 5098 levying general,
EMS, and bond repayment property taxes for collection in 2010.
Voted in favor of Motion: Wofford, Gehring, Brockus, Runyon, Shepherd, Arends, Maupin,
and McConnell
Voted opposed to Motion: Robinson
Motion carried: 8-Yes; 1-No
COUNCIL MEMBER REPORTS
Mike Shepherd announced that he would host his last District 5 Community Meeting on Thursday,
December 10, 2009 at 6:00 PM at the Memorial Lutheran Church, and it will also provide an
opportunity for the constituents to meet Greg Wheeler, the new District 5 Council Member.
City Council Reg. Mtg. Minutes
Wednesday, November 18, 2009
Page 7 of 7
Rov Runvon reported on his attendance at Homelessness Conference hosted by Kitsap
Community Resou�ces (KCR) and included information about a program cailed "Safe Park" which
allows homeless people to sleep in their own private vehicles near locations with facilities, and he
would like to see the City of Bremerton obtain a similar program.
Adam Brockus mentioned Winterfest will be held on Friday, December 4 from 6:00 to 8:30 PM.
Brad Gehrins� challenged each Council Member to bring in and retain one new business. �
Nick Wofford reminded citizens to make sure storm drains in their neighbofioods are clear.
President McConnell recessed the meeting at 7:28 PM for a 5-minute break; to be followed by a
15-Minute Executive Session with no action required.
9A — EXECUTIVE SESSION
15-minute Executive Session to discuss a"Real Estate Acquisition" per RCW 42.30.110(1)(b)
(Meeting was extended for 5 minutes and there was no action taken.. .)
With no further business, President McConnell adjourned the Council Meeting at 7:53 PM.
Prepared and Submitted by:
• r , / � / �
�f�f
CHRISTINE GRENIER
Council Assistant
Attest:
CAROL ETGEN, City Clerk
CECIL McCONNELL, City Council President
CM:CE:Is:cg
[iATE SUBMITTED: November 4, 2009 � �
AGENDA BILL
CITY OF BREMERTON
CITY COLJNCIL
. .......................................................................................
SUBJECT: Award Contract for the pre- Committee Meeting Date: November 10, 2009
purchase UV Treatment Facility — UV COUNCIL MEETING Date: "�eCClrYlip P,�^ 2, 20 �9
—.—
System Equipment Department: PW&U
to (�Q � A D n C ar b a n � r�. Presenter: Michael Mecham
Phone: 473-5288
SUMMARY: Sealed bids for the pre-purchase of iJV treatment equipment for the UV Treatment
Facility were opened on Novembet 18 The Engineer's Estimate for this project is $500,000 to
$700,000. i� bids were received for this project. L'Q Car bo n (;pY` was the
lowest responsive, responsible bidder with a bid of $ 2 O O (inclu ing estimated
' sales tax). Awazd is contingent on the Washington State epartment of Health approval of the third
party equipment validation report.
ATTACHMENTS: l. Council Summary; 2. Bid Tabulation
FISCAL IMPACTS (Include Budgeted Amount): This project is funded by federal stimulus monies
from the Drinking Water State Revolving Fund American Recovery and Reinvestment Act of 2009
(DWSRF ARRA). The forgivable principle DWSRF Loan for this project has been executed. The
budgeted amount for this project identified in the 2009 Budget is $2,500,000. Tota1 project is
estimated at $7,240,000.
APPROVALS: )�
DEPARTMENT DIRECTOR: iv/�" `
CITY ATTORNEY: �--
FINANCE DIRECTOR:
MAYOR: �-� � `
G -
COMMITTEE CHAIR �
COUNCIL PRESIDENT: � � CONSENT AGENDA
GENERAL BUSINESS ❑
PUBLIC HEARING ❑
RECOMMENDE� MOTION: Move to approve the purchase of UV equipment in the amount of �
$4 ��, O�� ��including sales tax) from �:'al a o n C�r bo h�o r p for the W
Treatment Facility Project and authorize the Mayor o finalize and execute the agreement upon
Department of Health approval of the equipment validation report.
COUNCIL ACTION: ❑ Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
COUNCIL SUMMARY
UV TREATMENT FACILITY — UV SYSTEM PROCUREMENT CONTRACT
Contract Summarv
The City is moving forward with the design and construction of the UV Treatment Facility
for the Union River surface water supply as required by the Long Term 2 Enhanced
Surface Water Treatment Rule. The ARRA funding requires that the entire project be
under contract for construction by February 17, 2010. To meet this deadline, the project
must be completed on a"fast track" schedule. The project is intended to be constructed
in three phases as follows;
• UV Equipment Pre-purchase — Award December 2009
• Site Preparation Contract — Award November 2009
• General Contract for Completed Facility — Award January 2010
The first phase of the project includes pre-purchase of the UV Treatment equipment as
this equipment will have a long lead time for delivery. The City initially advertised the UV
System Procurement Contract and bids were opened on October 8�', 2009. There were
two bids received and both bids had irregularities that resulted in both bids being
rejected. The project has been advertised for a second time and bids were opened on
November 18"', 2009. 2 bids were received.
C a� Qo 11 �'�n l.o�was the lowest responsive responsible bidder with a bid of
$ 47� r 09� . o O (including estimated sales tax). The engineer's estimate
for this project was 5500,000 to $700,000.
This equipment is highly specialized and � z � �-�� • ;�
must be pre-validated by third party �.�. � �,
testing. The actual award of the project is • ' --_-
contingent on Washington State , � �;.—,�: '�:�, t�, �
Department of Health approval of the low - ` . _ `
bidder's validation report for the proposed r
equipment. This report was submitted .�,
with the bid documents and will be
forwarded to DOH for review. It is
anticipated that DOH could take up to four
weeks to review the report and issue
approval. �
Fiscal Summarv
The total project cost is estimated at $7,240,000. The City has been offered, and has
accepted, $6,060,000 in forgivable principal Drinking Water State Revolving Fund
(DWSRF) loan funds for the work. The 2009 budget for this project is $2,500,000.
December 2, 2009
Council Summary
UV System P►ocurement
CITY OF BREMERTON
BID TABULATION
BID Bremerton UV Tneatment Facility — OPENED l
TITLE: W System Procurement BY: �
DATE November 18, TIME 11:00 a.m. RECO ED �
OPENED: 2009 OPENED: BY:
NAME OF BIDDER BOND ITEM 1 SALES TOTAL
TAX
$� �
� Cf� � � �� • �
�
SUMMARY TOTAL BID COMMENTS
AP� RENT LOW BIDDER �� �p ENGINEER ESTIMATE (INC SALES TAX) $/�/ Q �
/
C, �� 1
SECON OW BIDDER -,
T�v' .� ' S�'l � D �o
THIR O1N 81DDER
DATE SUBMITTED: November 4, 2009 5�
� AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
.......................................................................................�
SUBJECT: Award Contract for Committee Meeting Date: November 10. 2009
Construction of Gorst Sewerage and Septic COtJNCIL MEETING Date: '��o �,(o�' �� Z vp�
Abandonment Project to �-,�j C Department: PW&U �
�qT1rp��YUIC, Presenter: MichaelMecham
Phone: 473-5288
SUMMARY: Sealed bids for construction of the project titled "Gorst Sewerage and Septic
Abandonment Project" were opened on November�f_1� 2009. 12 bids were received for this project.
SCT S�ro.s�firv�vr� was the lowest responsive, responsible bidder with a base
bid of $ a,7 / z, 4 3�f -� 3 2 (including sales ta.x). The engineer's estimate for the base bid was
�,1(�2� I 9(o, Additive bids were also received from the low bidder in the amount of $ 989 2 3 . 34 .
�mc�uding sales tax). The total contract amount to be awarded to the low bidder is $�(1� 32
(including sales tax).
ATTACHMENTS: 1. Council Summary; 2. Bid Tabulation
FISCAL IMPACTS (Include Budgeted Amount): The contract includes the Gorst Sewerage and
Gorst Septic System Abandonment projects. The former is funded by a$3,620,213 ARRA
"Forgivable Principal" loan and a$520,987 ARRA loan. The septic system Abandonment project is
funded by a$1,283,000 ARRA "Forgivable Principal" loan. The 2009 budgeted amount for both
projects is $1,280,000 — the 2009 expense will not exceed the budget. The requested 2010 budget is
$5,200,000 for the Gorst Sewerage project and $1,390,000 for the Gorst Septic System Abandonment
proj ect.
APPROVALS: � � /
DEPARTMENT DIRECTOR: �� �
CITY ATTORNEY:
FINANCE DIRECTOR:
MAYOR: � � � �,.��
COMMITTEE CHAIR �
COUNCIL PRESIDENT: ` CONSENT AGENDA x
GENERAL BUSINESS
PUBLIC HEARING ❑
RECOMMENDED MOTION: Move to award a contract in the amount of $ a�,7 � 7'�'3� 3.Z
(including sales tax) with$CZ' ���5{',ru.Cf t/��for construction of the Base Bid •
of the contract titled "Gorst Sewerage" and authorize the Mayor to finalize and execute
th� �agreement with substantially the same terms and conditions as presented, contingent upon the
execution of the ARRA loan agreements and also authorize the Mayor to approve an amendment to
increase the Forgivable Principal Loans offered for the Project, and approve Change Orders in excess
of the limits of BMC 2.76.110 up to the amount of the additional grant funds offered.
COIJNCIL ACTION: ❑ Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
GORST SEWERAGE PROJECT
COUNCIL SUMMARY
Contract Summarv
This project has been bid in two separate contracts to complete the construction of the
Gorst Sewerage Project. The °Gorst Sewerage and Septic Abandonment" contract will
construct the sewer coliection system, and construct the septic system abandonment for
up to 97 properties. The base bid includes 76 properties. The separate °Gorst UGA
Sewerage Project Pump Stations SB3 and SB4" contract will construct two municipal
sewage pump stations to receive flow from the new collection system and pump it to the
City's WWTP via the Southwest Bremerton Forcemain.
The work under the "Gorst Sewerage and Septic AbandonmenY' contract was separated
into two °Schedules"; the Collection system is Schedule A, and the Septic System
Abandonment is Schedule B. Schedules A and B were further delineated into four
components; the Base Bid, Additive 1, Additive 2 and Additive 3. This definition was
made to allow the City flexibility in awarding the contract based on availabie funding.
City staff will make a recommendation to award both the "Gorst UGA Sewerage Project
Pump Stations SB3 and SB4" and the "Gorst Sewerage and Septic Abandonment"
contracts including any additives after review of bids.
At this time the construction ARRA loan agreements are still being processed by the
Department of Ecology. If the agreements are not finalized by the date of Council
approval to award, we will request that authorization to award be granted contingent
upon the execution of the ARRA loan agreements. This is necessary to maintain the
project schedule and meet the time requirements of the loan agreements.
Ecology has indicated that additional ARRA Forgivable Principal funding may be
available in the future; however, the City would need to accept and obligate any offered
grant funds in a very short period of time. To expedite the City's receipt and obligation of
the grant funding, the requested motion will include a provision to allow the Mayor to
approve an increase to the Forgivable Principal Loan and approve Change Orders in
excess of the statutory limits identified in Bremerton Municipal Code Section 2.76.110,
up to the amount of the additional grant funding offered.
The construction of all improvements will be completed within 205 working days of
Notice to Proceed - the estimated completion date is approximately October 15, 2010.
Fiscal Summarv
The project is funded by a combination of ARRA Grant and Loan funds, and wastewater
rates. The ARRA construction "Forgivable Principal" loans are a total of $4,903,213 and
the ARRA construction loan is $520,987. The project is included in the 2009 and 2010
wastewater Capital Budgets. The 2009 Project budget is $1,280,000 which includes
funding for project design, purchase of the pump station sites and limited construction
activities. The 2010 Project construction budget for the Gorst Sewerage Project is
$6,590,000. Details on the ARRA funding includes:
Ciry of Bremerton Page 1 of 2
Gorst Sewerage
November, 2009
LOAN AMOUNT INTEREST RATE ANNUAL DEBT
SERVICE APPROX
Collection System $3,620,213 N/A - Forgivable $0
Construction Princi al
Collection System $520,987 1.4% $28,920
Construction
Septic System $1,283,000 N/A - Forgivable $0
Abandonment Princi al
City of Bremerton Page 2 of 2
Gorst Sewerage
November, 2009
CITY OF BREMERTON
BID TABULATION
! BIT�LE _ _� Y Garst Sewerage � -----BYENED ' -- Lynn Price ---- ^ — --
i
� DATE j 10t12/2009 ' ��� � 11am � RECORDED � Gunnar
UPENED• � I OPENEp: ; ' BY: , Fridriksson
�,,,�.........__....---=-'----._ . _.. _�. ,.,.
NAME QF BIDUER � BOND BID � SALES = TOTAI
! � TAX ( - -
�--- ----- --- -- -----
; SCI Infrastructure, fnc. X � $2,717,434.32
� Rodarte Construction X I $2,889,635.32�
� -- ------------- -------- - �
�Hos Brothers ��! � X� � � $3,D33,435.09
( _�_ .- -
�- -- ------- --- ---- -- . _ _ ___._ '
� Construct Co. � X � � $3,248,665.81
! Pivetta Brothers � LL � LL � �{ - X - �- -T � - -- - — � $3,342,784.64 T �
,----- - - '
; ACI --- � — X - � - -- -- - - - --- ; $3,416,263.87
i
� Bruno Gonstructian � X , � � $3,803,135.38
I---- - -- _ ! _ _ �-__-- �- • - - - - .
i Tucci & Sons � X � � $3,671,776.37
;. __..._..._------- - -- --- --- � ' --- --
t2ogniin's �� X ; ' $3,690,003.20
:____ __ ___ _�.........._- -------- ------------ �---- ' _.
. Stan Palmer � X � ; � $3,743,259.55
; C onstruc tion i i �
` Seton Construction i X � �^ i { $3,774,448.52
_._ -- --} -- � � ----.
f Johansen�Excavating � X ; � $3,773,867.76
� . , i
. �. _ _ -- ------ ----*---- - -- -� - -- - - --- - --- - -------- -- --
� � i
j -- - --- - � � _�_ __ � -- - --- - --- , ---- -- �--- - _ _ . _ _ __ _ _ � _ _ _ .
� � ___�.__ _.___ - i - � -------
. � � �
s ---- - _____- __-_ � - -------------- --- �- -- - - - --� --� --_ __ _ _ . - -- --- - - .
I ' '
__ - - } - - --- --- ----- - � - - - -- - -- ; -- - -- - -- - - -
,
__ . � . - - ---- --�--------------- .
, , ,
,
-------- - - � -- - - ---- --- . ____�.�...�.,--- -.---
r�- --- ----,------�-----._ __----- _. _
; �
�
__ .__ - - ---------�-------------------- ---�.._..._----- ._-___...._..�.._ _
f -- i------------ - _..�_._. i -
� � �
; - - - - - - - ---- - , - - � -__ _ ____ _ _ _ _ � E
�-- ------- - -- - - --- ' ------ - - —�— ' - ----- --- _�
; i �
� � t
t ___� � � } _ _- ---�----- ------ --
� � , �
- - -- - -�---- --- -- ��..�... __ �
- -- --- --- � --- -- -- � --- ---�---___.�----- - -- --i
---- ; -_ . __ .._�..- ------ , � -------�
� I i
� �
--- --- - - - - - --- ---�--------
- ----- -- --._ _ ____ _ .
_.�.._- - -� -- • - � -- -- -------- ' -------- ---- �
i E
S(lMMAR
4PPARE�NT LO�'l' BiDL`EFr --- -^� -� - i igineer's Estin3ate:
SCi InfrastrucYure �— _ _ __�__ � $3,762,196.34 E
SECONi: LO:N RIOCJE"fi
Rodarte Canstruction
_. _ _ -------- - - - - - �
TNIFG lOW 61D ara - -- ------ --- -------� �---
Hos Brothers
i ---- , ---- -- , - ----
DA'TE SUBMITTED: �' - - - ----- - — -- �
AGENDA BILL -
CITY OF BREMERTON
CITY COUNCIL
.......................................................................................�
R�esol�,�, 111�. 3r�3
SUBJECT: Resolution to assume a portion Committee Meeting Date: December 2, 2009
of indebtedness of the South Kitsap Fire & COUNCIL MEETING Date: ���,,,�. a.� �.oaq
Rescue long term debt attributable to those Department: Finance
properties within the South Kitsap Industrial Presenter: Andy Parks
Area annexed to the City. Phone: 360.473.5722
SifMMARY: .
The City annexed the South Kitsap Industrial Area effective April 1, 2009 and other adjacent
properties during 2009. The annexation actions taken did not specify whether or not the City would
assume the non-voter approved general obligation debt attributable to the annexed property. As the
County Assessor prepared the tax assessments they noted this and have inquired as whether or not the
City intended to assume this liability. The total indebtedness to be assumed, if the Council agrees, is
$7,227.65 (principal only). If not, the annexed property owners will be levied a tax of approximately
$.0369 per $1,000 in 2010. The City's tax rate after the annexation (in 2009) is $1.96.
ATTACHMENTS: Proposed resoludon to assume indebtedness; Attomey General opinion re:
, assumption of indebtedness; email from Shannon Lewis from the Assessor's office; spreadsheet from
Assessor's office showing allocation.
FISCAL IMPACTS (Include Budgeted Amount): Estimate of $1,278 due in 2010, to be paid from
Fire budget.
APPROVALS:
DEPARTMENT DTRECTOR:
CIT'Y ATTORNEY:
FINANCE DIRECTOR:
MAYOR:
COMMITTEE CHAIR
COUNCIL PRESIDENT: CONSENT AGENDA ❑
GENERAL BUSINESS ❑
PUBLIC HEARING ❑
RECOMMENDED MOTION ReSa��,o-� No •3i.o3
Recommend approval of proposed sese���o assummg portion of indebtedness of South Kitsap
Fire & Rescue attributable to annexed properties.
COUNCIL ACTION: ❑ Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
RESOLUTION NO. 3 i o3
A RESOLUTION of the City Council of the City of
Bremerton, Washington assuming that portion of the South Kitsap
Fire & Rescue long term debt attributable to those properties
within the South Kitsap Industrial Area annexed into the City of
Bremerton.
WHEREAS, 225 tax parcels in the South Kitsap Industrial Area (SKIA)
were annexed to the City of Bremerton; and
WHEREAS, pursuant to RCW 35.13.270, those properties continue to be
obligated to pay their portion of the existing South Kitsap Fire & Rescue (SKFR) long
term debt through 2019 unless the City of Bremerton assumes this debt; and
WHEREAS, the amount of this total debt athibuted to those properties as
of November 1, 2009 is $7,227.65; and
WHEREAS, the annexed SKIA properties aze now paying for fire
protection service via the City of Bremerton regular and EMS property tax levies, which
have been increased by an appropriate amount attributable to the annexation;
NOW THEREFORE THE CITY COUNCIL OF THE CITY OF
BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The City of Bremerton shall assume the total SKFR indebtedness
ariributed to the annexed SKIA properties.
SECTION 2. The City of Bremerton shall make annual paytnents on the
indebtedness together with interest to the Kitsap County Treasurer until the indebtedness
matures, not to extend beyond calendar year 2019..
SECTION 3. Severabilitv. If any one or more sections, subsections, or
sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this Resolution and the same sha11 remain in full
force and effect.
SECTION 4. E ffective Date. This Resolution shall take effect and be in force
immediately upon its passage.
1
SKIA-South Kitsap Fire and Rescue
PASSED by the City Council of the City of Bremerton, Washington this 2nd day
of December, 2009.
CECIL McCONNELL, Council President
APPROVED AS TO FORM: ATTEST:
ROGER A. LUBOVICH, City Attorney CAROL ETGEN, City Clerk
R:�I.egal�L.egal�Resolutions�Finance�SKIA-SKFR Indebtedness.doc
2
SSIA-South Kitsap Fire and Rescue
DISTRICTS -- FIRE PROTECTION -- ANNEXATION OF A PORTION THEREOF —... Page 2 of 6
�,��U�.�,°�¢
DIS'f'RiC7'S -- FIi2E PROT�C"I'ION -- ANI3EXATION OF A PORTION THEREUF -- OUTSTANDitvG IND�,B'1'EDNESS.
Where a p�rtion oPa fire protection district is annexed to a city or town the property located in the area annexed remains subjcct to 4�x levi�s for
payment of outstanding indebtedness (bandcxi or othenvisel of the dislrict exisdng at th� time of anne�.ation unl��cs the city or town elects to assume
said indebtedness.
Aprii ig, x962
Honorable F. Stuari Foster
State 5enator. 14th Uistrict
331 Miller Building .
Yakima. WashingKOn
Cite as: AGO 6i-62 No. ii3
Dcar Sir.
By letter previot�sly acl:nowledged you have requested an opinion of this office on a question �vhich we paraphrase as follows:
ln the er�ent that a portinn of a fire protec�tion district is ttnuexed tn a city or town, does real aud personal property located in the
area annexed remain subject to tax ler�es for pa�Rnent of outstanding indebtedness, lx�nded or othenrise, of tLe district existing at tlie
time of unnexation?
N'e answer your questiou in the mauner set forth in our anal}^�is.
ANALYSIS
A c �mplete nnswer to your question rc:quires that �ve set forth, in full, for pnrposes of ea�aminafion and �nal,r•sis, the prrn�sions
nf §§ 2�, 2z, 23, and 2q, chapter 282, Iaw� of ig6� (cf. RCW 35• 35�13•243� 35•13.2.16, and 3g.i3.aso). We shull bencefortb
refer to these enactments by the'v respectire code section designntions.
RCW 35.i3.22o pm�ndes as foIlows:
"Whenever any territory w•1�icU includes,�ll the territoiy of a water, sewer orfire protection disriict, hereinafter referred to as'the
district; has beeu heretofore or is hereafterwneaced to a cih� or to�.�n, all real and personal property, [[Orig. Op. Page 2]] franchises,
righis, assets, taxes le«ed but not coilected for ffie district for other than iudebtedness, �.ater or sewer lines, facililies, or equipment of
tl�e district shall become tlie property of a city or towv to which anuexation is made and sucl� cih• shall, in addition to its otlier powers.
have tl�e same power to manage, control, niaintain �ud operate such facilities and to fix and collect charges to customers as tlie
corcunissioners of the district had prior to annexation, subject, ho�.�ever, to an��outstaudivgindebtedvess. bonded or otlieraise, of tlie
district or local improvement dishict or utility loca! unprovemevt disirict thereof,whicb indebtedves,c a citv or toHV mav bv resolntion
ot its oti •ernin.g bod +�elect to ussume and��av at the times and in the mwner said indebtedness is due and �a �able. Such e►ectiov to
assmne said iudebtedness ivav be made either upon the effecdve date of such lnnacation or at anp rime thei�eafter during tbe �eriod
sucl� indebtedness remains ou�ctanding Uutil cuch election is made tlie prooerq� annexed 1ud the owners �ud occupauts tl�ereof
shall eontivue liabie for its And tlieir pr000rtion of the unpaid iudebtedness and tl�e district, or local imprm�eanent district or utility
tocal improvement disuict, [[;]] and its officers shall coutinue to fimclion for the sote purpose of certifyiug tlie amount of pmperty tax
or assessmencs to be coilected avd paid on such indebtedness in the same mavner and lrv the same meaus as if the annexation had not
been made.
liftn•//ata wa anv/nnininn acnY�ePntinn—archivPR�ir1-77(17 12/2/2n�19
DISTRICTS -- FIRE PROTECTION -- ANNEXATION OF A PORTION THEREOF —... Page 3 of 6
"If a city or towv elects to assume outstanding indeUtedness, and propern� taxes or assessn�ent� liave been le��ed for sach
purpose but not collected for tl�e district or local imprrn�ement distriM or utility local impro�•ement disUict thereof prior to the date of
such electiov by the city or towv, the same shall when collected belong and be paid to the aune�ting ciry and be used by such city or
to�.n so far as necessvy for pay7nevt as aud wben due of tl�e indebtednecs of tl�e district or local impmr•ement district or utility local
improvemevt districi existing and unpaid on t6e date sucl� city or town elects to assume such indebtedness. If a aty or to�+v takes
over any funds wl�icb have been collected for pa�ing any bovded or other [[Orig. Op. Page 3]J indebtedness of tl�e district the same
sliall be used for the purpose for whicli collected and for no ot6er purpose." (Emphasis supplied.)
RCW 3g.i3.2q;; prrn as follows:
"Jf a�orticLn of the districK 4'_q!►?1 to ��a�t si gercont of the flrea or sixty percent of the assessed � of tbe real pmperty
inclndcd ��lthiv tbe district is annexed to a city or town, the city or town may:
"(i) Adopt an orclinauce assunung ihe full and complete mauagement And coutrol of the entire district,whereupou the
prn��sious af RCW 35.i3.a2o s�all be oQerative ae to sucU anne�catinn• or
"(a) Adopt an ordinunce asswning jurisdiction of the district's responnl�ilities, pmperty, facilities and equipment Hithin tl�e
area annexed: Pin�ided, That if tHe anneaced uira contaius any properiy, faciliNes or equipment whicl�, on the date of annexation,
were seniug any portion of the district not annexed, the city or to►en shall assume full owvership, mauagemeut aud control of such
pmperty, f�cilities and equipment subject to any one of the followiug conditions acceptable to the district and city or town concerned:
"(a) The ciN or town shall, for the economic life of such property, faeilities and equipment, make snch properl��, facilities and
equipment a�ailable for use by the distriM to the same extent such property, facilities and equipment sen•ed the unannexed �ortion of
the district on the date of annexation; or
"(b) The city or town shaD pay to tbe district that pmportion of the equity of the distriet in sucb properh�, facilities and
equipment equal to the proportion the assessed valuation of all property subject to taxativn situated «�thin the ama of the district uot
annexed bears to the total assessed 4aluation of all pmperty subject to taxation situated �.zthin the district prior to anu�ation. Por the
ptvpose of this p�rtgrapl�, assessed �aluation shall be thc ��aluation of the pmperty as last determincx] b.r the county assessor. In
detesmining the eqiuty of the district for pwposes of this pangraph due consideration shall be ([Orig. Op. Page 4]J given to
depreciarion of the economic life of tbe pmperh-, facilities and eqnipment due to age and condition, and to replacement costs far
comparnble property, fncilities und equipment to sen�e thut portion of tl�e district nvt annexc�; or
"(c) The city or toHm shull, for tLe ecounmic life of such pmpertp, facilities and equipment, pro��ide for contiuuih� of sen�ce to
tl�e unanuexed portion of the distriet served by su� pmperty, facilities and equipment on the date of annexatiou.
"A ciry or to�v acquiring pmperty, facilities and equipment under the pro�isions of subdi�ision (2) of tl�is section shall ucquire
such piropert}�uUject to the debts and obligatious of the district for which sucli prooert}; facilities and equipment would I�ave beev
liable if no anneacatiov bad been made; and, iu cuch cases, the annexed properry, and t6e owners and occapan�s tl�ereof,shall continue
liable for �ay�nents of its and tl�eir pmnortionate chare of an �LUnpaid indebteduess lwnded or othernise �vith the right on the part of
the dist�ict oi�ci�tls to make tax levies aud collect charges on suc�rouerty or owveis or occup�nts �vd to enforce sucli collectionc ac
if the avnexation had uoi Ueen made." (Emphasis supplied.)
RC�4' 35.iga46 pro��des as follo�+�s:
"tf theportion of the distri�K annexed to a city or towv is less thln s'n�}�.percent of the area of the district and less than sixtr
percent of the assessed valuation of the m.al property within the district, the pro�isions of RCW 35• ?-a3, �cept snbdivi,sion (�), as
now or hereafter amended, shalllpph:" (�tnphasis supplied.)
RCW 35.�3.25o pro��des us follo�vs:
"Notwitlistavdiug anv of tlie pro��cionc of this cLapter ro tlie contrarv, as uow or l�ei�eafter amended, tl�e city may, through its
legislative auWorityauthorize n contract with the district [[Orig. Op. PAge 5]] witli respect to rights, duties and obligations of the city
and tl�e district as to ownersl�ip of property, senices, assets,liabilities and debts and auy other auestions urising out of the annexation,
wl�icl� contract may also make provisions for serr�ices by tl�e district and use of its fucilities or real estate witUin the city, aud which
w.._..��,.. ....... ......�,...:,,;,,,, „�....��o,.+;,,.,—,,.,.�,;..o�e,;,�—��m i�i�i�nnn
DISTRICTS -- FIRE PROTECTION -- ANNEXATION OF A PORTION THEREOF —... Page 4 of 6
contract may also pro��de that for such time as the couh�act ma�� prrnide such dishict may covtinue to exercise atl ri�ts, pri��leges,
powers aud functions of such district pro��ded irv law as if there l�ad beev no anvexadon, including but not by way of limitation the
rigl�t to le�y and collect special assessments, adopt and cam� out the pinvisions of a comprehensive plan, or amendmeuts thereto, for a
system of impirovemevts, aud issue and sell i�e��enue and genernl obligaliou Uonds." (Emphasis suppliedJ
Thougi� somewhat complex and requiring a fuil and carefiil �rading, we belie��e these stahiton• pro��sions to be clear and
nnambiguous regarding the question you 6ave raised.
Yonr question incolces the annexation of oniy a_ pgrtion, rather than all of the territory of a fire protection district.
Consequently, we may disregard RCW 35•�3•2�p� tiuP_ra, cxcept to the extent that this secrtion may lx�come operatir•e througl� e]ection
to pursuc the procednre pro��ded for by RG'W g5•�3• �1)•
Turning then to RCW 35•13•243, si lUi'd , we note first tliat this section applies in the case of anuexation oPa ion of a district
(including u fire protection district) ". .. equal to at least sixty percent of the amu or sixh� peirent of the assessed valuation of the real
pmperty iucluded within the district. ..." In such a case, the annexin�; cih� or to�,a has an election of either (i) assuming ihe full and
complete management and contral of the entire district, or (2) ussun►ing jurisdictiononly of the districYs res}x�nsibiliries, property,
facilities and equipmentwithin the area annexed.
lf the first of these alternative courses of actiou is cliosen, then ". .. the pm��isions of RCW 35.i3.z2o, suura, shall be opentive
as to such anvexation." In other words, if tl�e first alternatir�e is chosen tl�en, Uotii as to disposition of properiy and as to We
assumptiov or nouassumption of outstanding ivdebtedness, tl�e anuexation is govemed by the same statute as applies where all of the
teiTitorv of a district is annexed.
Referring back to that portion of RCW 35.i3.22o, SuDra, go�erning the outstanding indebtedness of tbe annexed district, �+�e
note tl�at the anne�dng city or towu again is authoiized to make av election. [[Orig. Op. Page 6]] 1h5th regard to,
... any outstanding indebtedness, bonded cLr other�vige, of the district ...[t6e annexing city or town) ma�= by resolntion of its
go�=erning body e)ect to assume nnd pay [the s�me] at the times �nd in the manner said indebtedness is due and payable. Such
clection to •a.5sume snid indebtedness may be made either upon the effective dlte of s�ich annexation or flt any time thereafter diving
the pc:riod such indebtedness rcmains ontstanding. ..." (Emphasis supplied J
In otlier wor3s, the annexing cit�� or to�+�n may elect to a.ssume the outstandiu� indebtedness, "houded or otherwise," of the
3istrict. The phrase "Uonded or othenvi.�e' makes it quite clear that "indebtedness" includes such indebteclness as is e��denced Yry
coupou warrauts of the tppe described in your letter.
However, "until such election is made, tl�e pmperty annexed and tlie o+,vers and occupunts t6ereof shall continue liable for its
�nd their pmportion of the unpaid iudebtedness and the district, ... aud its officers shall contiuue to function for tl�e sole purpose of
certifjing the amount of property tax or assessments to be collected and paid on sucli indeUteduess in the same manuer and by tl�e
same ineans as if the annexatiou had not beeu made." RCW 35.i3.�a2o,su ra.
Again, by way of paraphnsing, until flnd unless the wnexing aty or to�tiv elects to assume the outstanding indebtedness of tlie
annexed district, the pmperty ]ocated therein remains liabte for its proportion of tl�e ivdebtedness and subject to taxation for tl�e
payment tl�ei�eo£ After the indebtedness is assumed, tl�e pmperty taaces whic6 "ha�•e been le�ied ... but noi collected" for purposes of
the indebtedness ". .. shail when coliected belong and be paid to the anneaang city wd be used by such city or town so f�r as necessarv
for payTnent as and wl�en due of the indebtedness ..." RCW 35.ig.22o, sunn• Thu.s, even after assumption of the indebtedness, the
property pre��ously assessed for paymient of the indebtedness remains liable for pay��ent of tl�e tax le�led before the ciry's election to
assume snch indebtedness.
Next, we shall consider an annexation imroh�ng "at lc:ast sixp� percent of the area or sixty pemenT of the assesse�d valnation of
the real propertt+ inclnded �+lthin tl�e district," where the anncxing cit�� or toHm elects to follow the second alternative caurse of actiou
illlYt1017Zh:(� Uy RCW 35•i3•243 sn�ray numely, to assume jurisdiction only of the distri�K's responsbilitics, property, faulitics and
[[Orig. Op. Page �]] eqnipment witUin_�,he �r�,�_�nnucgd. In this ca.se, tl�e applicabie st�tnton� pro��sion {with regard to dispositiov of
the indebtedness af the district) is foimd in the last paragraph of RCW 35•�3•243, sLR� 7'h�s paragraph reads as follows:
':9 city ar town acquiring pn�perty, facilities and f�uipment under tLe pm�isions of subdicisiou (2) of this seetiou shall acyuire
1,�►„•//�*rt.��a nnv/nn;n;nn aerY`lePrtinn—arrhivPRrit�=77(17 12/2/2��9
DISTRICTS -- FIRE PROTECTION -- ANNEXATION OF A PORTION THEREOF -... page 5 of 6
sucl� propertv subject to the debts and obligations of tl�e district for which sucb properiy, facilities and equipmeut would have been
liable if vo anneaation had been made; and, in such cases, t1�e aunexed propert��, and the otivners and occapavts tliereof, shall continue
liable for pa��nents of its and their proportionute shaze of any unpaid indebtedness,lwnded or othenvise, witl� tlie rigl�t on tlie parl of
tl�e district officiaLc to make tax le�ies and coltect charges on such pmperty or oNVers or occupants, and to euforce such collections as
if tlie annexation had not been made." {Emph.�sis supplied.)
Here, then, the annexing city or town whicl� has elected to assume jurisdiction ont�� of the districYs re.sFrons'bilities, pmperty,
facilities and equip�nentwitl�in the area annexed has no furtlier electiov to make. It cannot assume the outstanding indebtedness of
the district.i/ Ratber, said outstanding indebtedness remains the oblig�rion of tl�e disri�ict, and the annexed property continues to be
liable for payment of its proportionate share of any suc6 unpaid indebtedness (agaiv, "bonded or otherwise") wd subject to taxation
for papment thereof.
Thirdh�, �ce have the case of annexflrion of a portion of a district (including a fim pmtection district) encompassing ". .. less than
si�Rp percent of the area of the distri�K and less than sixty percent of the assessed valuation of the real property �vithin the distriet" In
fliis case, we look 8rst to RC,'tN 35•�3•24F� Pro�nding as follows:
"If tve portion of the district annexed to u uty or to�.�n is less than sixty percent of the area of tl�e district and less than sixt3
penent of the assessed �:�luation of tlie real property witl�in the district, the pro�isions of RCVd 35• ��Pt subdi�ision (i), as
uow or hereafter amended, shaill apph�."
[[Orig. Op. Page 8])
T6us, we are immediatelp referred back to all of RC'�N 35.i3.243,s except subdnision (i) thereoE Ob��ionsly, this means
tl�at where less t6av sixty percent of tl�e area of a fire protection district and less than sixty percea�t of tlie assessed valuation of real
property witl�in said district is annexed, the propert,r• within tl�e tu�ea avnexed remains liable for payment of its proportionate share of
any unpaid indebtedness, bonded or othenvise, of the disttict and snbject to taxation for payment thereof, all in the manner pro��ded
for by the last paragraph of RCW 35.i3z.;g, quoted and discussed abrn•e.
I`inally, z+e Uave RCW 35•�3•250, supra pro�iding, in pertinent part, thai:
"Notwitl►staudiu� auy of the pm��sions of this chapter to the contrar��, ... the cih� muy, tLmup,h its ]egisiative aut6oriq�
authorize u couri•act Htith the disirict, �+�th respect to rights, duties and oblieations of the ciq� and the district as to awvership of
property, sentices, assets,liaUilities and debts aud any ather que.cdons arisiug out of tlie avnexation, .."(EmpLasis supplied.)
Under tl�is statute it would seem p�s.�ible for the annexing city Ol' TOw11� CV en where the poriion of the disirict anvexed consists
of less tliau sixty pei�cent of the area of the district and less than sixty petcent of the assessed �aluation of real property �+�ithiv the
district, to assume at least a portion of the out�tanding indebtedness of the district. Presmnably, if t6is were done, then the property
��itlun tl�e area annexed would no longer Ue liable for pa�Rnent of its proporiiovate share of ihe portion of the indebtedness assumed,
or subject to taxation for the payzneut thereof. In other words, under RC4V 35•13•'=5 tlie annexiug city and the annexed district may
pro�ide, lrv contract, for disposition of matters arising fmm the annexation, iucluding dispositiov of the outstaudiug indebteduess of
tl�e district.
B}�«ay uf summary nnd conclusion, tl�en, it is onr opinian that under RC'�N 35•13•��0, :�5•�3•� 43> 35• and 35•
si lD13 , in the case of annexation of a portion of a fire pmtection district the real and personal propem� located within the area annexed
remains subject to taxatiov for pay�nent of tl�e outstanding iudebtedness, "bonded or otlier�ti�se" of tl�e district except:
(t) Where the annexing ciry or town elec�ts to assume suid indebtedne.ss (in casc of annexation of xt leust sixh� penent of the
area or sixty percent of the assessed �alultion of tUe mal property [[Ori$. Op. Page qJ] included �+rithin tl�e district) pursuant ta RC.'W
35.�3. (�) and ROW 35.i3.22o supra;
{z) Where tlie t�nnc;xinR ut�• aud the aunexed district enter into a contract, uuder RCW 35•13•25�, wl�erebV the annexing rity
assumes tLe outstanding indebtedness of tLe anuexed d'vstrict.
We trust that tlie foregoing wIIl be of acsistance to you.
l..aa... //.,+.. ...� .....,/�..:..:i.r. aerv7ovr4inr�cor�l�ivP Q�i�=77(�7 � 2�2.�2nn7
DISTRICTS -- FIRE PROTECTION -- ANNEXATION OF A PORTION THEREOF -... Page 6 of 6
Very truly yours.
JOHN J. O'CONNEI,L
.4ltarney General
p[{���p }{, AL)ST1N
Assistant Attorney General
••` POOTNOTES '"""
t/Except to the extent that RC1V 35.13.250, supra, may be said to authorize such an assumption. See discussion, iufi'u.
l,t+„•//atn .a�a nnvinnininn aer»r9ceetinn—arehiveR�i�-77(17 12/7./7.nn9
Andy Parks
From: Shannon Lewis [SLewis@co.kitsap.wa.us]
Sent: Tuesday, November 24, 2009 1:18 PM
To: Andy Parks
Subject: Re: Fwd: City of Bremerton Contact Information
Attachments: Re: Fwd: Ciry of Bremerton Contact information
�
Re: Fwd: City of
Bremerton Con...
Hi Andy,
Our office and the Treasurer's Office have been checking on what needs to be done for the
City of Bremerton to assume the portion of debt for the SKIA properties. Per AGO 1962 No
113
http://atg.wa.gov/opinion.aspx?section=archive&id=
the city may elect to assume the debt but it needs to be done be a resolution of the
governing board. Do you think that it would be possible to have the City Council approve
a resolution on the assumption of debt on or before December 3, 2009? That is about as
long as we can wait to find out as if we do need to charge the SKIA properties the tax, we
have a number of things to accomplish in a short time frame.
The actual debt is for all outstanding long term debt that Fire 7 secured when these
properties were in their district. From the schedule that the Treasurer's Office provided
there are six long term debts, the date of final maturity on the last debt is June l,
2019. Some of the debts end in 2012, 2014, 2017 and 2018 according to the schedule. Of
course any debt secured after the annexation would not be included.
The spreadsheet I sent to you earlier listed the estimated portion of debt that would be
the SKIA properties responsibilities for 2010 but did not include data for future payments
until the long term debt is paid in full.
Shannon Lewis
Kitsap County Assessors Office
(360) 337-7094
(360) 337-9874 fax
slewis@co.kitsap.wa.us
Please note our office hours Monday - Thursday 8:00 to 5:00
Closed Fridays
Visit our web site at www.kitsapgov.com/assr/
1
�+ ��� � T ,,,, a .,tJ��y ��» 1!t �,,�. -. ! ,�,, f . �p 1 ., A�,�, �!.�� � �,�"'
w7}�� F ��', afl �=�;`y ,w7f.3171�../� � �;,,""y, �.I��iJ►CII%i!1'Yg�?�" ,� �hi` a�dl►IJo1��¢`�� , f^. L'Jfi17t�D�M1� " �„���. ,l1 �,�'"'"� 1JO��*' �7iv �
� r _ � , �r � �S ,� � � � :��= * y�s'�r.�s. �:� �' ����9 ' a rz.���,n<�
�� �: � y ^�` � � � ' .;�t q ' � ^� « ��; S �'� ,���� ` ✓ �'. ��*' � )M � �' x . ) �/� n .y{
, z�, .;✓-r,s Y,� M�z'^a... .�r ' , � �wv, r =*,>." — ;�.���'az" ,��,d����,�'i.���,":�k ��', � ����� , ° l,�li��� T-�I�it��C .
$6,965,103,089 $34,547,516 $6,999,650,605 0.493560578% $1,464,389.17 $7,227.65 $1,354,331.66 $6,684.45
DATE SUBMITTED: October 26, 2009 ��
AGENDA BILL
CITY OF BREMERTON
' CITY COUNCIL
. .......................................................................................
SUBJECT: Ordinance No. �� Committee Meeting Date: November 10, 2009 &
Adopting Utility Rates and Gener�Facilities Budget Workshops
Chazges and Amending BMC Chapter 15.06 COUNCIL MEETING Date ,
Department: PW&U ��N u � `�'�
Presenter: Phil Williams �°r Z
Phone: 473-5315
SUMMARY: The proposed ordinance amends Appendix A of Section 15.06.015 of the BMC
relating to assessments, rates, fees, and chazges for municipal water, wastewater, and stormwater
services by establishing new rates for all categories to implement a 3% rate increase effective January
1, 2010 and an additional 3% rate increase effective July 1, 2010.
ATTACHMENTS: Ordinance No. a 7
FISCAL IMPACTS (Include Budgeted Amount): The proposed rate increases are built into the
proposed 2010 budget. -
APPROVALS: �
�
DEPARTMENT DIRECTOR: 2�_,_,�
CITY ATTORNEY:
FINANCE� DIRECTOR:
MAYOR:
COMMITTEE CHAIR �
COUNCIL PRESIDENT: CONSENT AGENDA ❑
GENERAL BUSINESS
PUBLIC HEARING
RECOMMENDED MOTION: Move to pass Ordinance No.5D9� adopting new utility rates
effective January 1, 2010 and July 1, 2010 and amending BMC Chapter 15.06.
COUNCIL ACTION: ❑ Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
Council Summary
Ordinance #5078, approved earlier this year, amended the BMC
to allow an additionai payment in lieu of tax (PILOT) fee of $205,000
for water, $303,000 for wastewater, and $42,000 for stormwater (BMC
3.50.050(i)). In addition to this one-time payment, it is the intent of
the City to increase PILOT from the current 9.5% to 15.5% effective
�anuary 1, 2010. To allow the Utilities to recoup these additional
taxes, it is proposed by this agenda bill, to raise the Utilities rates 3%,
effective January 1, 2010, and another 3%, effective July 1, 2010.
These rates will be in effect until PILOT is reduced and the Utilities
have recovered these additional 2009 and 2010 taxes. The BMC
currently allows the Utilities to adjust their rates in accordance with
the most current Consumer Price Index for all Urban Consumers,
Seattle, unless the utility rates have been otherwise adjusted by the
City Council during the previous six (6) month period (BMC
15.06.015(b). The most current CPI for all Urban Consumers, Seattle
is -.4%.
ORDINANCE NO. SD ��
AN ORDINANCE of the City Council of the City of
Bremerton, Washington amending Appendix A of Section
15.06.015 of the Bremerton Municipal Code relating to
assessments, rates, fees, and charges for municipal water,
wastewater, and stormwater services by establishing new rates for
all categories to implement a 3% increase effective January 1,
2010 and an additional3% increase effective July 1, 2010.
WHEREAS, the City Council desires to amend the rates, fees, and charges set
forth in Appendix A of Section 15.06.015 of the Bremerton Municipal Code; NOW
THEREFORE
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON DOES
HEREBY ORDAIN AS FOLLOWS:
SECTION 1. Appendix A of Section 15.06.015 of the Bremerton Municipal
Code is hereby amended to read as sta.ted in E�chibit A atta.ched hereto, and incorporated herein
by reference, establishing new rates for all categories effective January l, 2010 through June 30,
2010.
SECTION2. Appendix A of Section 15.06.015 of the Bremerton Municipal
Code is hereby amended to read as stated in E�chibit B attached hereto, and incorporated herein
� by reference, establishing new rates for all categories effective July 1, 2010.
SECTION 3. The rates set forth in Exhibit A of this Ordinance sha11 be effective
January 1, 2010. T'he rates currently in effect as set forth in Appendix A of Section 15.06.015 on
the date of adoption of this Ordinance shall remain in effect until January 1, 2010.
SECTION 4. T'he rates set forth in Exhibit B of this Ordinance shall be effective
July 1, 2010. The rates in effect on January 1, 2010 as set forth in Exhibit A of this Ordinance
shall remain in effect until July 1, 2010.
SECTION S. Severabilitv. If any one or more sections, subsections, or sentences
of this Ordinance are held to be unconstitutional or invalid, such decision shall not affect the
validity of the remaining portion of this Ordinance and the same shall remain in full force and
effect.
SECTION 6. Ef�ective Date. This Ordinance shall take effect and be in force ten
(10) days from and after its passage, approval, and publication as provided by law.
2010 Utility Rates
PASSED by the City Council the day of , 2009
CECIL McCONNELL, Council President
Approved this day of , 2009
CECIL McCONNELL, Mayor Pro Tem
ATTEST: APPROVED AS TO FORM:
CAROL ETGEN, City Clerk ROGER A. LUBOVICH, City Attorney
PUBLISHED the day of , 2009
EFFECTIVE the day of , 2009
ORDINANCE NO.
R:U.egat�I,egal\Ordinances�Pubtic Works & Utilities�2010 Rate Ordinance.doc
2010 Utility Rates
Appendix A
ASSESSMENTS. RATES, FEES, AND CHARGES
� EFFECTIVE , ANUARY i, ZO10
W ithin Outside
City Limits City Limits
GENERAL FACILITY CHARGES
Water (per Meter Size)
5/8" x 3/4" $ 2,511.00 $ 2,511.00
� ° $ 6,276.00 $ 6,276.00
I 1�2° $ 12,554.04 $ 12,SS4.00
2° $ 20,084.00 $ 20,084.00
Greater than 2" Calculated based on usage
Wastewater (per ERU) $ 3,801.00 $ 3,801.00
Stormwater (per tSU) $ 1,019.00 I�(/q
CONNECTION/INSPECTION F .F.4
Water Connection Fees
5/8" x 3/4" �89 $ 2,016.00 $�;933s3A $ 3,024.00
��� �--3�A94A9 $ 2, l 72.00 � 2 --���,�;8 $ 3,258.00
I1/2" $-�-�3A&A9 $ 3,407.00 $—�4;9��A $ S,110.50
2° $--4;�9�98 $ 4,327.00 �--6;39�:s.►9 $ 6,490.50
Greater than 2" Actual Time & Materials 150% of Actual Time & Materials
Fietd [nspection Fees
Water main extensions (per foot) $--�:36 $ 130 $ -�84 $ 1.95
but not less than: $--4E8�9 $ 482.00 $—�A�:�9 $ 723.00
Pump Station $---6�A9 $ 636.00 �--43�88 $ 954.00
Miscellaneous (per hour) ID �3� $ 54.00 �&A9 $ 81.00
Wastewater Connection Fees
Latera( Connection at P/L � �3.� $ 54.00 �----�99 $ 62.00
Lateral Connection at Main $-385-88 $ 3 f 7.00 $—�54.�8 $ 365.00
Conveyance Facility Ext. (Per Foot) �5 1-7e $ L75 ffi- -�.� $ 2Al
but not less than: �3?� $ 382.00 $--�-43�99 $ 439.00
Pump Station $---�AA $ 636.00 �--�}$,89 $ 731.00
Miscellaneous (per hour) ID 3�� $ 54.00 �--6��9 $ 62.00
EXHIBIT A
t o( 8
Within Outside
City Limits City Limits
RETAIL WATER SERVICE RATES
Generai Service - Monthly Service Charge
Meter Size
5/8 x 3/4 inches $ 18�33 $ 10.85 � E5,S6 $ 16.28
l inch a 43,93 $ 12.39 $-----�B�A� $ 18.59
l 1/2 inch $ l�;e $ 17.61 $---35�i6 $ 26.42
2 inch � 33T;: $ 23.66 �► 3d �� $ 35.49
3 inch $ 43�55 $ 44.89 � 65s3� $ 67.34
4 inch �A9 $ 83.00 $�--1��,A9 $ 125.00
6 inch $-�S&A8 $ 297.00 $ 43�� $ 446.00
8 inch �--I-,85.3,9A $ 1,084.00 $--4 $ 1,626.00
t0 inch �r 3 $ 3,865.00 �A6 $ 5,798.00
12 inch �--�4�}A�88 $ 14,528.00 e'"�' ��s $ 21,792.00
Residential Commodity Charge (per HCF)
0- 10 HCF/Month $--� :$ 1.17 � 1�T $ 1.76
Over 10 HCF/Month ffi },3e $ 1.32 � '� $ 1.98
Non - Residential Commodity Charge (per HCE) � 1�T $ 1.28 �-1-8e $ 1.92
Fire Protection - Monthly Service Charge
Service Size
1 inch �$ 1��3� $ 18.47 � �6� $ 27.71
1 l/2 inch $----�6,�34 $ 27.80 $ 49.-� $ 41.70
2 inch �--33�A� $ 36.14 �64 $ 54.21
3 inch �--35,6� $ 39.83 � �8� $ 59.75
4 inch $ 43,T3 $ 43.41 � 63:�3� $ 65.12
6 inch � 3,3,gA $ 54.18 � 75,� $ 81.27
8 inch � 'i6.� $ 72.12 $--�ASr.A3 $ 108.18
10 inch $-----9Sz99 $ 101.00 �-----�4�99 $ 152.00
12 inch $--}�4�89 $ 144.00 $---- 3�&A9 $ 216.00
Commodity Charge (per HCP) ffi -3�4e $ 2.56 $ 3�a $ 3.84
- Eor Usage Other Than Firefighting
Low-Income Senior and Low-[ncome Disabled Citizen - Monthly Service Charge
Base Charge (per account) �--1�A.33 $ 10.85 � �3:Se $ 16.28
Commodity Charge
0- 5 HCF/Month No Charge No Charge
5- 10 HCF/Month $ l,at $ 1.17 ffi 1:7T $ 1.76
Over 10 HCF/Month � 1:3e $ 1.32 Z '..� $ 1.98
Temporary/Construction Meter
1" Meter
Deposit �---�SA:AA $ 300.00 �-�5499 $ 300.00
Base Fee (per month) � ��=A3 $ 12.39 � 1-�e5 $ 18.59
Set Up Fee �--�8(i:A9 $ 112.00 �A9 $ 112.00
Hydrant meter (3" Meter)
Deposit $---i�AA989 $ 2,000.00 $--1;9AA,89 $ 2,000.00
Base Fee (per month) $ 43:SS $ 44.89 � 633� $ 67.34
Set Up Fee $--�i:A9 $ I 12.00 $--}�AFi:AA $ I 12.00
Equipment Loss/Damage Actual Time & Materials I50% of Actual Time & Materials
Commodity Charge (per HCF) $ 1-3t $ 1.28 a 1-Se $ l.92
2of8
Within Outside
City Limits City Limits
RETAIL WATER SERVICE RATES (cont'dl
City Parks and Recreation Dept. - Irrigation
Commodity Charge (per HCF) $ A�,6a $ 0.64
3 of 8
Within Outside
City Limits City Limits
RETAIL WASTEWATER SERVICE RATES
Monthly Service Charge
Single Family
Base Charge (per account) $ 31-,� $ 32.20 � 33,�5 $ 37.03
Commodity Charge (per HCF) � 4,�1� $ d.32 a 4-�8a $ 4.97
Duplex on 1 Meter or 2 Bidgs on 1 Meter
Base Charge (per unit) a 34,T6 $ 25.50 � 3&� $ 29.33
Commodity Charge (per HCF) � �1� $ 4.32 $� �� $ 4.97
Multi - Family
Base Charge (per unit) $ �:e $ 25.50 � 3S� $ 29.33
Commodity Charge (per HCF) a 4r1� $ 4.32 � �a $ 4.97
Commercial I
Base Charge (per account) �---�{6�+�;� $ 47.60 � �3rl� $ 54.74
Commodity Charge (per HCF) ��1,3�3 $ 4.45 S ;T. $ 5.12
Commerciai [I
Base Charge (per account) �--4�,8� $ 48.42 $ 54� $ 55.68
Commodity Charge (per HCF) $�-�7� $ 6.96 � '�-7T $ 8.00
Commercial [II
Base Charge (per account) $--f16,�3 $ 47.95 � 53�33 $ 55.14
Commodity Charge (per HCF) � 5.33 $ 5.70 � 6=3g $ 6.56
Low-Income Senior and Low-[ncome Disabled Citizen
Base Charge (per account) � �9,39 $ 19.97 � 2�38 $ 22.97
Commodity Charge (per HCF)
0- 5 HCF/Month No charge No charge
Over 5 HCF/Month �-�{s-1� $ 4.32 � �a $ 4.97
Septage Disposal (per gal(on of tank capacity) � A�33 $ 0.24 � 9�,33 $ 0.24
Leachate Per Gallon of Tank Capacity � 8�T $ 0.11 $ 9rlt $ 0.11
a of 8
Within Outside
City Limits City Limits
RETAIL STORi�iWATER RATES
Monthly Service Charge
Residential 1 (Single Family/Duple!�)
Eiase Charge (per account) � 8�59 $ 8.76 N/A
Exception: Duplex
with 2 Meters (per account) � ::�5 $ 4.38 N/A
Residential [I
Base Charge (per [SU) + 50% of the Base Charge � k3�TS $ 13.14 N/A
Residential ([(
Base Charge (per ISU) + 100% of the Base Charge � �7- e$ 17.52 N/A
Commercial [
Base Charge (per [SU) � B�SA $ 8.76 N/A
Commercial lI
Base Charge (per [SU) + 50% of the Base Charge ��,T3 $ 13.14 N/A �
Commercial li[
Base Charge (per [SU) + 100% of the Base Charge � �T�g $ 17.52 N/A
Public School Districts (per account) � 8-58 $ 8.76 N/A
Low-lncome Senior and Low-Income Disabled Citizen
Base Charge (per account) � S,-1� $ 5.35 N/A
Multi - Family & Commercial Rate Adjustment
Water Quality (per [SU) � 9A4 $ 0.97 N/A
Water Quantity (per (SU) � 3�8+ $ 2.93 N/A
Stormwater Penalty
New Multi - Family & Commercial '
development without on-site detention
Charge (per ISU) $ �-5� $ 1.95 N/A
5of8
Withio Outside
City Limits City Limits
MISCELLANEOUS FEES AND CHARGES
Park Reservation Fee $ 30.00 $ 30.00
(non-refundable)
Office Services
New Account (includes water turn-on) $ 20.00 $ 20.00
Account Maintenance $ 5.00 $ 5.00
Past Due Notice $ 2.50 $ 2.50
Lien Recovery Chsuge $ 100.00 $ 100.00
C:lose AccounVMeter ltead/Water 5ervice'1'urn-
°� $ 20.00 $ 20.00
Field Services
Pavement Restoration Charge
(refundable, if assessed and not required)
Asphait Patch $ 694.00 $ 1,041.00
Concrete Patch �—�S94�A9 $ 1,248.00 �--�34�,89 $ 1,872.00
Aspha(t Trench $--81�99 $ 1,582.00 � 1-,3a�SA $ 2,373.00
Concrete Trench $— �34S�8A $ 1,548.00 $-3;533:A9 $ 2,322.00
County Road Permit N/A Cost
Wet Tapping (Water Main Only)*
8" and smaller - excl excavation & backfill $--3�4�A9 $ 2,984.00 �A9 $ 4,476.00
S" and smaller - service to property line $--3�344�98 $ 7,082.00 $--8 $ 10,623.00
Greater than 8" x 8" Actual Time & Materials 150% of Actual Time & Materials
*Does Not Include Pavement Restoration Charge
Fire Hydrant [nstaltation'"
8" x 6" and smaller - service to property line �—�6;-59�AA $ 8,628.00 $---9�56 $ 12,942.00
Greater than 8" x 6" Actual Time & Materials l50% of Actual Time & Materials
Water Meter Reinstallation
3/4" & t" $�--$3�89 $ 79.00 �--53:99 $ 79.00
1-1 /2" & 2" � �33� $ 125.00 m��3L�8 $ 125.00
3" and greater Actual Time & Materials Actual Time & Materials
Water Meter Reactivation $ 50.00 $ 50.00
Water Meter Tampering
Tampering Removal �--�8A:99 $ 212.00 �A��9 $ 212.00
Tampering Reinstallation Actual Time & Materials Actual Time & Materials
Cross-Connection Control
Inspection $ �A� $ 56.00 �96 $ 56.00
Fire Service - Detector, Meter & MXU $-43l,99 $ 354.00 �:96 $ 354.00
Storz Adapter $—�—�4�:A9 $ 304.00 $--��6 $ 304.00
8 of 8
� Withio Outside
City Limits City Limits
�IISCELLANEOUS (cont'dl
Water Servicc Turn-off/Turn-on
(Customer Request)
Regular Hours $ 20.00 $ 20.00
After Hours $ 175.00 $ 175.00
Delinquency Notice $ 10.00 $ 10.00
Water Service Turn-off/Turn-on
(Delinquent Accounts)
Regular Hours $ 50.00 $ 50.00
After Hours $ 175.00 $ 175.00
Flow and Pressure Test (Uncertified)
3/4" & 1" meters only $--�s8,89 $ 56.00 �---3A�68 $ 56.00
1-1/2" & 2" meters only �-----98,89 $ 102.00 �----9�98 $ 102.00
Larger than 2" Actual Time & Materials Actual Time & Materials
Utility Plant Locates
Regular Hours N/C N/C
After Hours $ 191.00 $ 191.00
Emergency N/C N/C
Meter Test Fee (based on meter size)
3/4" & 1" $ �33� $ 136.00 � -�-�3�3,A9 $ 136.00
1-1/2" & 2" �99 $ 187.00 �--�-}�B�,:AA $ 187.00
3" or greater Actual Time & Materials Actual Time & Materials
Engineering Services*
Plan Check Fees
Main Extensions: per foot �--A3� $ 0.30 $----8:44 $ 0.45
BUT not less than �---34�4.A9 $ 251.00 �---�A9 $ 377.00
(Includes hydrants and appurtenances
and connection to water system)
Pump Stations $-(��3-98 $ 631.00 �---�38��A $ 947.00
Fireline Extension $---98=8A $ 101.00 ��9 $ 152.00
Irrigation Systems $-----98:A8 $ 101.00 �----�A9 $ 152.00
System Connections �-�-9S�A9 $ 101.00 $----�4�-A9 $ 152.00
Miscellaneous (per hour) $ �3� $ 54.00 �----�8s88 $ 81.00
* Fees include original review and one resubmitta( review.
Additional reviews will be charged at miscellaneous hourly rate (above).
7of8
i
�
Within Outside
City Limits City Limits
rI1SCELLANEOUS (conNdl
Storm Drainage Plan Review Fees **
Preliminary Drainage Plans
Residentiai Development � $ 390.00 N/A
Non-Residential Development $---36�,A9 $ 270.00 N/A
Plus per [SU $ i-1-,� $ i 1.75
Final Detailed Drainage Plans
Residential Development (per lot)
0- 20 Lots fi--4�,A� $ 42.30 N/A
21 - 50 Lots �--3�6� $ 30.56 N/A
51 - 100 Lots � 36�3 $ 27.04 N/A
100+ Lots a 3�� $ 23.50 N/A
Minimum Charge � 35� $ 300.00 N/A
Non-Residential Development
per [SU � �3.� $ 23.50 N/A
Minimum Charge �89 $ 359.00 N/A
Resubmittal Fees
First Resubmittal No Charge N/A
Subsequent Resubmittal $---�9��A9 $ 300.00 N/A
Storm Drainage Inspection Fees **
Residential Development (per lot) $ 1-7.-� $ 17.63 N/A
Non-Residential Development (per [SU) �--1�.� $ 17.63 N/A
Minimum Charge �. �73.AA $ 180.00 N/A
Conveyance Facility Extensions (per foot) � 9�4 $ 0.94 N/A
Minimum Charge �—�49:A9 $ 359.00 N/A
Unscheduled Inspections* (per site visit) � �3� $ 54.00 N/A
'(Unscheduled inspections shall be tracked through the course of a project and billed after the final site
, inspection. Fees for unscheduled inspections shall be paid prior to final occupancy approval.)
** Does not apply to single family residence or duplex construction on an existing established lot.
Utility/Lien Search Fee (Manual)**' $ 30.00 $ 30.00
***Search per parcel
8af8
i\
Appendix A
ASSESSMENTS. RATES, FEES� AND CHARGES
EFFECT 10 July 1, 2010
Within Outside
City Limits City Llmits
rFNERAt. FAGIL•lTY GHARG��
Water (per Meter Size)
5/8" x 3/4" $ 2,586.00 $ 2,586.00
1"
$ 6,464.00 $ 6,464.00
I 1/2" $ 12,931.00 $ 12,931.00
2 �� $ 20,687.00 $ 20,687.00
Greater than 2" Calculated based on usage Calculated based on usage
Wastewater (per ERU) $ 3,915.00 $ 3,915.00 "
Stormwater (per ISU) $ 1,050.00 N/A N/A
CONNECTION/INSPEGTION FE �
Water Connection Fees
5/8" x 3/4" �-3�A�6,96 $ 2,076.00 $-3s6�4,p9 $ 3,114.00
1"
11/2" �""' $ 2,237.00 �-3;358,99 $ 3,355.50
� T�4 '�A9 $ 3,509.00 �58 $ 5,263.50
2 �� �-�4;3�7499 $ 4,457.00
$-6s49�59 $ 6,685.50
Greater than 2" Actuat Time & Materials I50% of Actual Time 8c Materials
Field [nspection F'ees
Water main extensions (per foot) � k39 $ 1.34 �— ; $ 2.01
but not less than: $---.48�,99 $ 496.00 �--�33,gg $ 744.00
Pump Station $---636AA $ 655.00 $---934:9g $ 983.00
Miscellaneous (per hour) $---54,68 $ 56.00 $—g}�gg $ gq,pp
Wastewater Connection Fees ,
Lateral Connection at P/L $---34,99 $ 56.00 �---�6�Sg $ 64.00 '
Lateral Connection at Main $----3i.�A9 $ 327.00 �---�S,A9 $ 376.00
Conveyance Facility Ext. (Per Foot) � �;, $ � gp $ „�� $ 2 �� I
but not less than: �-38�,gA $ 393.00 �--434,99 $ 452.00 I
Pump Station �--636�A9 $ 655.00 $ '�3-1-A : $ 753.00
Miscelianeous (per hour) �-=-�� $ 56.00 $---� $ 64.00
�
�
�
�
�
�
I
�
�
, EXHIBIT B '
1 of 8
Withio Outside
City Limits City Limits
RETAIL WATER SERV[CE RATES
General Service - Monthly Service Charge
Meter Size
5/8 x 3/4 inches � i�9,eS� $ I 1.18 �- 1� $ 16.77
I inch S'r--F�39 $ 12.76 � '� $ 19.14
i I/2 inch �� $ 18.14 � �6 �,�;s $ 27.21
2 inch ID 33,6e $ 24.37 m 3S�i4 $ 36.56
3 inch �-a4,S4 $ 46.24 a 6�,34 $ 69.3b
4 inch �--�3,AA $ 85.00 �,88 $ ( 28.00
6 inch $�--34��9 $ 306.00 $--446,89 $ 459.00
8 inch $---�A84:99 $ 1,117.00 �99 $ 1,676.00
10 inch �---3�86�S�,A9 $ 3,981.00
12inch ��� $ 5,972.00
�--44�538:A8 $ I4,964.00 ��9 $ 22,446.00
Residential Commodity Charge (per HCF)
0- 10 HCF/Month � 1--1T $ 1.21 $ 1�,�6 $ 1.82
Over 10 HCF/Month �-R33 $ 1.36 � �$ 2.04
Non - Residential Commodity Charge (per HCF) $----�„� $ 1.32 � �$ 1.9g
Fire Protection - Monthly Service Charge
Service Size .
1 inch ffi 18=4r $ 19.02 � �'J�-� $ 28.53
1 1/2 inch � 37,�8� $ 28.63 ffi 4a„e $ 42.95
2 inch � 36.� :$ 37.22 ffi 34.-� $ 55.83
3 inch � 3�e3 $ 41.02 $ 5�73� $ 61.53
4 inch �-�3:4�l� $ 44.71 � 63�� $ 67.07
6 inch � 54-�8 $ 55.81 � 8�3T $ 83.72
8 inch $ 7�„ ;$ 74.28 �98.}$ $ 111.42
10 inch �---�$kA9 $ 104.00 $ �3�As $ 156.00
12 inch �A9 $ 148.00 �99 $ 222.00
Commodity Charge (per HCF) . $ 3�56 $ 2.64 � 3:8+ $ 3.96
- For Usage Other Than Eirefighting .
Low-Income Senior and Low-[ncome Disabled Citizen - Monthly Service Charge
Base Charge (per accoant) �'►--�53� $ I 1.18 $----�6-38 $ 16.77
Commodity Charge
0- 5 HCE/Month No Chargc No Charge
5- 10 HCF/Month � },.lY $ 1,2� $ ;�, $ 1 82
Over 10 HCF/Month � �:33 $ 1,36 $ ;s;s $ 2.04
Temporary/Construction Meter
1" Meter
Deposit $ 300.00 $ 300.00
Base Fee (per month) � 1�.34 $ 12.76 � i-8:�9 $ 19.14
Set Up Fee $ l 12.00 $ 112.00
Hydrant meter (3" Meter}
Deposit $ 2,000.00 $ 2,000.00
Base Fee (per month) $ ".�e, $ 46.24 � �:34. $ 69.36
Set Up Fee $ 112.00 ; I-��gs
Equipment Loss/Damage Actual Time & Materials l50% of Actual Time & Materials
Commodity Charge (per HCF) a �,ag $ 1,32 � ,E,qQ $ � 98
2of8
W ithin Outside
City Limits City Limits
RETAIL WATER SERVICE RATES (cont'dl
City Parks and Recreation Dept. -(rrigation
Commodity Charge (per HCF) � g,�� $ p,�
3of8
Withio Outside
City Limits City Limits
RETAIL WASTEWATER SERV[CE RATES
Monthly Service Charge
Single Family
E3ase Charge (per account) $ 3�,� $ 33.17 a 37-A3 $ 38.15
Commodity Charge (per HCF) � �3,33 $ 4.45 � 4,�,'• $ 5.12
Duplex on 1 Meter or 2 Bidgs on 1 Meter
Base Charge (per unit) � 35:39 $ 26.27 � �33 $ 30.21
Commodity Charge (per HCF) � 4�33 $ 4.45 � "�. $ S.12
Multi - Family
Base Charge (per unit) a 3Ss38 $ 26.27 � �33� $ 30.21
Commodity Charge (per HCE) � �33 $ 4.45 $ ;� $ 5.12
Commercial I
Base Charge (per account) �69 $ 49.03 ID 34.� $ 56.38
Commodity Charge (per HCF) � -4:�5 $ 4.58 $ S-1a $ 5.27
Commercial [I
Base Charge (per account) � 48�43 $ 49.8� $---53-�i8 $ 57.35
Commodity Charge (per HCF) $�g� $ 7, � 7 �__� $ 8
Commercial [II
Base Charge (per account) $-�F�7�3 $ 49.39 $ 33�1t $ 56.80
Commodity Charge (per HCF) $ 5-?e $ 5.87 ffi 6�3g $ 6J5
Low-[ncome Senior and Low-[ncome Disabled Citizen
Base Charge (per account) S'i----1�9-4'� $ 20.57 � �.� $ 23.66
Commodity Charge (per HCF)
0- 5 HCF/Month No charge No charge
Over 5 HCF/Month � 4:33 $ 4.45 $ �$ 5.12
Septage Disposal (per gallon of tank capacity) � 9� $ 0.25 �-��4 $ 0.25
Leachate Per Gallon of Tank Capacity � A,�lT $ 0.1 l � A-lT $ 0.11
4 of 8
Withio Outside
City Limits City Limits
RETAIL STORMWATER RATE�
Monthly Service Charge
Residential [ (Single Family/Duplex)
Base Charge (per account) �-�---.5�6 $ 9.02 N/A
Erception: Duplex
with 2 Meters (per account) ��--�{�35� $ 4.51 N/A
Residential [[
Base Charge (per ISU) + 50% of the Base Charge $'.--�3�� $ 13.53 N/A
Residential [([
Base Charge (per tSU) + 100% of the Base Charge $ 1�.3�3� $ i 8.04 N/A
Commercial I
Base Charge (per ISU) �--�,.�b $ 9.02 N/A
' Commercial [I
Base Charge (per ISU) + 50% of the Base Charge �'...—}3�1� $ 13.53 N/A
Commercial III .
Base Charge (per [SU) + 100% of the Base Charge � }�s,,�, $ 18.04 N/A
Public School Districts (per account) �----�'�6 $ 9.02 N/A
Low-Income Senior and Low-lncome Disabled Citizen '
Base Charge (per account) rg---s�,,33� $ 5.51 N/A
Multi - Family & Commercial Rate Adjustment
Water Quality (per ISU) �---�; $ 1.00 N/A
Water Quantity (per ISU) m -�93. $ 3.02 N/A
Stormwater Penalty
New Multi - Eamily & Commercial
development without on-site detention
Charge (per tSU) fi---�,9-5 $ 2,0I N/A
I
I
c
5 of 8 �
i
E
R
I
Within Outside
City Limits City Limits
MISCELLANEOUS FEES AND CHARGES
Park Reservation Fee $ 30.00 $ 30.00
(non-refundable)
Office Services
New Account (includes water turn-on) $ 20.00 $ 20.00
Account Maintenance $ 5.00 $ 5.00
Past Due Notice $ 2.50 $ 2.50
Lien Recovery Charge $ 100.00 $ 100.00
C'lose AccounVMeter Read/Water Service'1'urn-
o � $ 20.00 $ 20.00
Field Services
Pavement Restoration Charge
(refundable, if assessed and not required)
Asphalt Patch $ 694.00 $ 1,041.00
Concrete Patch $ 1,248.00 $ 1,g�2,pp
Asphalt Trench $ 1,582.00 $ 2,373.00
Concrete Trench $ 1,548,00 $ 2,322.00
County Road Permit N/A Cost
Wet Tapping (Water Main Only)*
8" and smaller - excl excavation & backfill $ 2,984,00 $ 4,476.Q0
8" and smaller - service to property line $ 7,082.00 $ 10,623.00
Greater than 8" x 8" Actual Time & Materials 150% of Actuat Time & Materials
*Does Not Include Pavement Restoration Charge
Fire Hydrant [nstallation•
8" x 6" and smaller - service to property line $ 8,628.00 $ 12,942.00
Greater than 8" x 6" Actual Time & Materials 150% of Actual Time & Materials
Water Meter Reinstallation
3/4" 8c 1" $ 79.00 $ 79.00
1-1/2" & 2" $ 125.00 $ 125.00
3" and greater Actual Time & Materials Actual Time & Materials
Water Meter Reactivation $ 50.00 $ 50.00
Water Meter Tampering
Tampering Removal $ 212.00 $ 212.00
Tampering Reinstallation Actual Time & Materials Actual Time & Materials
Cross-Connection Control
[nspection $ 56.00 $ 56.00
Fire Service - Detector, Meter & MXU $ 354.00 $ 354.00
Storz Adapter $ 304.00 $ 304.00
s of 8
W ithin Outside
City Limits City Limits
MISCELLA�EOUS (cont'd)
Water Service Turn-off/Turn-on
(Customer Request)
Regular Hours $ 20.00 $ 20.00
After Hours $ I'75.00 $ 175.00
Delinquency Notice $ 10.00 $ 10.00
Water Service Turn-offll'urn-on
(Delinquent Accounts)
Regular Hours $ 50.00 $ 50.00
After Hours $ 175.00 $ 175.00
Flow and Pressure Test (Uncertified)
3/4" 8c 1" meters only $ 56.00 $ 56.00
1-1/2" & 2" meters only $ 102.00 $ 102.00
Larger than 2" Actual Time 8c Materials Actual Time & Materials
Utility Plant Locates
Regular Hours N/C N/C
After Hours $ 191.00 $ 191.00
Emergency N/C N/C
Meter Test Fee (based on meter size)
3/4" & 1" ffi �36.� $ 140.00 �----�36:99 $ 140.00
1-1/2" & 2" $----�S�A9 $ 193.00 $--�S�:A9 $ 193.00
3" or greater Actual Time & Materials Actual Time & Materials
Engineering Services*
Plan Check Eees
� Main Extensions: per foot � A:36 $ 0.31 � 8�4�3 $ 0.47
BUT not less than � 33�� $ 259.00 $---3�-89 $ 389.00
([nciudes hydrants and appurtenances
and connection to water system)
Pump Stations �--63-kA8 $ 650.00 �---�4�99 $ 975.00
Fireline Extension $--�A�kAA $ 104.00 � ES�� $ 156.00
[rrigation Systems $----�9d-,AA $ 104.00 � 1�3�� $ 156.00
System Connections � i�9T�6 $ 104.00 fi---�3,?,99 $ i 56.00
Miscellaneous (per hour) $ s,,4:� $ 56.00 �--S-�A9 $ 84.00
* Fees include original review and one resubmittal review.
Additional reviews will be charged at miscellaneous hourly rate (above).
7 of 8
Within Outside
Clty Limits City Limits
MISCELLANEOUS (cont'dl
Storm Drainage Plan Review Fees *"
Preliminary Drainage Plans
Residential Development $—�-39A�A9 $ 402.00 N/A
Non-Residential Development $---�a,89 $ 278.00 N/A
Plus per ISU � 1-1,T5 $ 12.t0
Final Detailed Drainage Plans
Residentiai Development (per lot)
0- 20 Lots �--4�39 $ 43.57 N/A
2l - 50 Lots � 3A�36 $ 31.48 N/A
51 - t 00 Lots � 37-,� $ 27.85 N/A
100+ Lo�s a 33.SA $ 24.21 N/A
Minimum Charge �---3A8:A8 $ 309.00 N/A
Non-Residential Devetopment
per ISU � �3,38 $ 24.21 N/A
Minimum Charge $---359�A9 $ 370.00 N/A
Resubmittal Fees
First Resubmittal No Charge N/A
Subsequent Resubmittal �---3AA:99 $ 309.00 N/A
Storm Drainage [nspection Fees'*
Residential Development (per lot) $---�,63 $ 18.16 N/A
Non-Residentia! Devetopment (per ISU) � 1,T�3� $ 18.16 N/A
Minimum Charge $----�89,A8 $ 185.00 N/A
Conveyance Facility Extensions (per foot) $ A=94 $ 0.97 N/A
Minimum Charge $--3�S�A9 $ 370.00 N/A
Unscheduled Inspections* (per site visit) $-54-89 $ 56.00 N/A
. *(Unscheduled inspections shall be tracked through the course of a project and billed after the final site
inspection. Fees for unscheduled inspections shall be paid prior to final occupancy approval.)
** Does not apply to single family residence or duplex construction on an existing established lot.
Utility/Lien Search Fee (Manual)*** $ 30.00 $ 30.00
•'*Search per parcei
8 of 8
, . Page 1 of 1
Lori Smith
From: Lori Smith on behalf of City Council �
Sent: Tuesday, December 01, 2009 1:12 PM
To: City Councii
Subject: Citizen Concern - PILOT / Rate Increases (William L. Rieger)
Dear Mr. Rieger,
Thank you for your letter to express your concerns. A copy of your e-mail will be provided to the
Council Members for their review and consideration.
Thank you,
� ��
Legislative Assistant -
Bremerton City Council .
(360) 473-5280
cc: Council Members
Mayor Lent
Andy Parks, Finance Director
Phil Williams, PW Director
From: Sherlock Bill [mailto:sherlockbill@yahoo.com]
Sent: Monday, November 30, 2009 12:34 PM
To: City Council
Subject: PILOT / Rate increases
Deaz Council members:
I read with interest the article in the Kitsap Sun, November 28, 2009, page A2, by Steven Gardner. It concerns
PILOT and utility rate increases. As a city resident, rate payer, and employee, I am concerned about the City's
financial situation. I believe there should be a"time out" before any changes are implemented. My request is
' two fold:
1. Reverse the decision to increase PILOT from 9.5% to 15.5%. It should be left as is and another review of
the general fund with Mayor Lent should begin. Costs , whether necessities or "nice to have", should be looked
at with a spirit of frugalitv. Everyone will have to give, including police and fire, for the good of the City.
2. Do not raise utility rates at this time. With the PILOT increase suspended the increased drain on utility
funds will not be there. A review of costs, like with the general fund, should also be pursued with the same
spirit of frugality. Revenue is needed to keep the services going, but it is a difficult economic time for
many residents and businesses. Rate increases can have a detrimental affect on amacting and keeping both.
Sincerely,
William L. Rieger
1522 Almira Court
PO Box 2423
Bremerton, Wa 98310-0317
Phone 360-377-8443
12/2/2009
From: Andy Parks
Sent: Wednesday, December 02, 2009 9:39 AM `
cc: City Council
Subject: budget information
Caroi and Adam,
Per request I am attaching budget information related to our discussions yesterday about a
change to the proposed utility rate increase.
The attached information reflects a"no increase" scenario. The changes to the general fund are:
1. Reduced PILOT of $164,000
2. Increased property taxes of $75,000 (due to increased assessed values from
previous information from the County Assessor)
3. Net gap of $89,000
4. Prior to noon today we will have identified $89,000 in budget reductions to balance
the general fund budget
5. The utility funds show in total and individually the reduced revenue, reduced PILOT
payments and net reduction in their fund balance.
6. We have shown the minimum requirement for the operating fund balance, which
each fund meets.
Please call if you have any questions, and we look forward to discussing this evening.
Andy
Generaf Ftu�d
Proposed Revised
(Amounts in thousands) 2010 2010
FTE positions 219.38 2�19.38
Reve��ues
Taxes $22 $23,OOS
Licenses & Permits 953 953
Inter�overnmental l ,900 l ,900
Charges for Services 3,908 3,908
Fines & Forfeits I,435 1,435
Other Revenue 5,027 4,863
Debt Pa 0 0
Total 3G,I_53 35,064
Expenditures
City Council 317 31 �
Executive 445 445
Finance 1421 1,421
Le�al 1005 ],005
I-�uman Resources 369 369
Cammunity Development 1301 1,301
Municipal Court 1412 1,412
City Auditor 158 l58
Law Enforcement � 1067'2 10,672
Fire/Emer�ency Medical Servic 8l 44 8,144
Police & Fi► Pension 2733 2,733
Facilities 829 829
Parks & Reci•eation 3243 3,243
Engineering 321 321
Economic Development � �
Non-Departmental 4 3,784
Total �xpendit«res 3G,153 36,153
Revenue over(undcr} expenditt 36,1 ] 7 -89
Beginnin�; fund balanee 2,371 2,371
Endi��g fund balance $38,487 $2,282 $3,073�
Propec�ty Tax lncrease 75
Reduction in PILOT -1G4
Nct Change in Fund Balance -89
*8.5% 01' O��crating Expcnses
Eitterprise Fu��ds
Proposeci Revised
(Amounts in thousands) 2010 2010
�TE positions �'� - -
Reve�iue
Taxes $12 �12
Licenses & permits 0 0
Inte�•governmental 0 0
Char�;es for services 28,768 27,710
Tines & forfeits 0 0
Other revenue 1,314 1,314
Debt proceeds ] 0,74b 10,746
Tatal revenue �d,$40 39,782
Expenditu�•es
Personnel 8,581 8,581
Supplies, services & taxes 10,295 10,295
Capital expenditu�•es 16,490 l 6,490
Debt service 4,058 4,05$ ,
Transfers 4,T43 3,979
Totai expenditures 43,567 43,403
Revenue over(under) expenditures -2,728 -3,622
Beginnin�; fund balance 14,450 I4,450
Endiaag fi�nd bala��ce 11,722 10,828
Fund totals - Expenditures o��ly
Water Utility 16,686 16,G33
Wastewater Utility 20,744 20,648
SW Bremerton Sewer Utility - -
Stormwater Utility 2,818 2,803
Gold Mountain Golf Caurse 3,319 3,319
Utility Debt Resexve - -
Tota! Etiterprise Fu��ds �43,567 �43,403
��� FTE positio�is ideniificd by dcparlmct�t
Watcr Sa1es -345
Wastcwaicr Sales -61 g
Stor�n��ater Sa1es -95
P1LOT Transfer 1 b4
Tot�l Nci Changc in �'u�id Balancc -89�
Water Utitity
Proposed Revised
(Amouiats in tliousands} 2010 2010
T�TE positions �'� - -
Revenuc
Taxes $0 $0
I.icezjses & per 0 �
Inter�overnt��ental 0 0
Charges for services 9,�z2 8,���
Fines & forfeits 0 0
Otherrevenue 780 780
Debt proceeds 5,363 5,363
Tolal reve�auc 15,1GS 14,820
�xpei�ditares
Personnel 4,150 4, l 50
Supplies, services & taxes 3,364 3,364
Capitai expenditures 7,080 7,080
Debt service 7S2 752
Transfers 3,340 1,287
Total expenditi�res 1G,686 Id,G33
Revenue over(unctex�) expenditures -1,521 -3,813
Beginning fu�id balance 5,843 5,843
�tl(Iitlg fU11t� �AlAt1CC �4,323 �4,031 $1,0.4G*
���FTE positions idcntifecl by dcpariment
Water Salcs -345
P1LOT 53
Nct Changc i�i Fuud Balancc -Z9
* 12'% of Operating E�penses
Wastewater Utility
Pi•oposed Revised
(Amounts iz� thousands) 20I0 2010
FTE positions {'> _ _
Revenue
Taxes $l2 $12
Licenses & pernnits 0 0
lntergovernmental 0 0
Charges for services 14,224 13,606
rines & forfeits � fl
Otherrevenue 400 400
Debt proceeds 5,383 5,383
Total �•evenue 20,019 19,4a1
Expenditures
Personnel 3,207 3,207
Supplies, services & taxes 3,295 3,295
Capital expenditures 8,855 8,855
Debt service 3,185 3,185
Transfers 2,202 2,106
Tota! expenditi�res 2Q,744 20,C48
Revenue over(under) expenditures -725 -1,247
Beginning fund balance 5,625 5,G25
Ending fuiid bala�}ce �4,900 $4,378 $1,033�
{t> F'CE positions ide�itified by department
Wastcwatcr Sales '
PILOT ��
NCL CIli113�C 321 Fl11lCI B alance - �� 2
'� 12%, of Opci�tin�; Bxpcnses
Stormwater Utiiity _
Praposed Revised
(Amounts ir� thousands) 20I0 2010
FTE positions �'� - -
Reve�iue
Taxes $0 $0
Licenses & permits a 0
t��tergovernmenial � �
Charges for services 2,193 2,098
Fines & forfeits a 0
Other revenue 85 85
Debt proceeds 0 0
Total revenue 2,278 2,183
ExpeE�ditures
Pei•sonnel 3 ,224 I ,224
Supplies, services & taxes 599 599
Capital expendituz�es 540 540
Debt service I6 l6
Ti-ansfe��s 439 424
TotaM expenditirres 2,$18 2,803
Revenue over(u�ider} expe��ditures -540 -620
Be�,�inning fund balance 2,730 2,730
Ending fiiud balance $2,190 $2,110 $494*
���FT'E positions idcntifieci by dcpariaaient
Stormwater Sates -��
PILOT � 5
Net Change in �und Balance -
�` 12°/u of Operating Expcnses
Page 1 of 1
Lori Smith
From: Andy Parks
Sent: Wednesday, December 02, 2009 12:56 PM
To: 'Will Maupin'; City Council
Cc: Phil Williams
Subject: RE: Response from Andy - Budget Information
Responses:
1. We estimate the general fund will receive $164k less PILOT from the three utilities if utility rates are not
increased 3°/o January 1, and 3% July 1.
2. The County Assessor provided us updated valuation information for properties that provide additional taxing
authority, i.e., annexed properties and increases to utility valuations. This information normally is received in
mid- to late November and historically has been rolled into the levy authority, as authorized, and tax receipts
without any change to the budget. The additional property taxes associated with the new increased valuation,
at the current estimated collection rate of 94.5% of the levy amount, is $75k.
a. The net funding gap of $89k will require budget reductions. We have identified those reductions, so the
general fund is in balance.
3. The new estimate of additional PILOT is $1.336 million. ($1.5 million less $164k). Per review of the City's
utilities the revenues generated are adequate to fund operating costs, i.e., maintenance and operation, of the
utilities, pay debt service, meet debt coverage requirements, and make transfers, including the additional
PILOT. There will be reduced revenue available for capital replacement and expansion of the utilities funded
by rates. On a short-term basis, i.e., calendar year 2010, the financial impact on capital is partially offset by
federal grants totaling approximately $11 million. We will continue our efforts to look closely at our operations
to seek additional and continual cost savings, update the rate analysis, discuss and determine the levels of
service provided in the general fund (and elsewhere) and alternative revenue sources to fund these services if
necessary to reduce and eventually eliminate the need for the additional PILOT. With that information we will
prepare alternatives and strategies to implement.
a. The utility budgets, as adjusted, include no rate increase in 2010.
From: Will Maupin [mailto:Will.Maupin@comcast.net]
Sent: Wednesday, December 02, 2009 11:41 AM
To: City Council; Andy Parks
Cc: Phil Williams
Subject: RE: Response from Andy - Budget Information
I have three questions:
1. Do you mean that we would have $164K less PILOT transferred to the general fund if we don't raise utility rates
3%? Those numbers don't seem to add up.
2. How can we have increased property taxes? We tell the County how much to collect which is 1% more than last
year. Increased property values have nothing to do with the amount collected.
3. What about the $1.5M that is being taken out the utilities due to the increased PILOT? Just because the funds
meet minimum fund balance this year doesn't mean that they can meet their maintenance and operation
obligations for the future.
Will
12/2/2009
`
�y, (,,��
DATE SUBMITTED: November 20, 2009 �
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
.......................................................................................�
SUBJECT: Final Public Hearing to Committee Meeting Date: Budget Workshops &
Approve and Adopt the City of Bremerton PH November 18, 2009
2010 Annual Budget by Ordinance No. COUNCIL MEETING Date: December 2, 2009
J' Department: Financial Services
Presenter: Andy Parks
Phone: 473-5722
SUMMARY: The City of Bremerton prepares its budget on an annual basis under the authority
granted by Chapter 35.33 RCW. The budget process is designed to meet the operations and service
needs of the City by integrating the planning and implementation of City programs and objectives
with the allocation of resources sufficient to support such services and programs — within the limits of
available funds.
A preliminary annual budget for fiscal year 2010 has been prepazed and filed with the Office of the
City Clerk. Public hearings have been held for the purpose of fixing the final City Budget and the
City Council has deliberated prior to the approval and adoption of the budget. One change has been
made to the preliminary budget; Within the General Fund, the City Council appropriation has been
increased $1,000 and Financial Services appropriation decreased $1,000, for a net effect of $0 on the
General Fund. There are no other changes proposed at the time of submitting this agenda bill.
ATTACHMENTS: 2010 Budget Ordinance, Revenues Sources — All Funds, Expenditures — All
Funds, Salary Schedule — Elected Officials, Management Salary Plan, Professional, Confidential &
Fiduciary Pay Plan, Staffing Authorization — All Departments/Funds.
FISCAL IMPACTS (Include Budgeted Amount): This Ordinance establishes the legal authority for
City expenditures in 2010.
APPROVALS: �
DEPARTMENT DIRECTOR:
CITY ATTORNEY: �
FINANCE DIRECTOR:
MAYOR: � ,v..
COMMITTEE CHAIR �
COUNCIL PRESIDENT: ` '� , � CONSENT AGENDA ❑
GENERAL BUSINESS ❑
PUBLIC HEARING ❑
RECOMMENDED MOTION: Move to approve Ordinance No 5099 adopting the City
of Bremerton 2010 Annual Budget.
COUNCIL ACTION: ❑ Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
ORDINANCE NO. 5099
AN ORDINANCE of the City Council of the City of
Bremerton, Washington, approving and adopting the budget for the
City of Bremerton for the fiscal year 2010, and appropriating the
amounts set forth in each fund in accordance with RCW 35.33.075.
WHEREAS, State law, Chapter 35.33 RCW requires the City to adopt an annual budget
and provides procedures for the filing of estimates, a preliminary budget, deliberations, public
hearings, and fmal fixing of the budget; and
WHEREAS, a preliminary budget for the fiscal year 2010 has been prepared and filed in
the Office of the City Clerk for the City of Bremerton; public hearings have been held for the
purposes of fi�ng the final City Budget; and the City Council has deliberated and has made
adjustments and changes deemed necessary and proper; NOW TI�REFORE,
THE CITY COUNCII, OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY ORDAIl�1 AS FOLLOWS:
SECTION 1. That the 2010 Annual Budget for the City of Bremerton,
Washington, on file in the office of the City Clerk, covering the period from January 1, 2010,
through December 31, 2010, with regular revenues and unencumbered fund balances of
I$' ^�,�,�144,424,284 and expenditures and ending fund balances of
Q' ^��'" '' 4 �$144,424,284 is hereby approved and adopted, and the respective amounts
� �
provided for in said budget for the several funds of the City of Bremerton are hereby fixed and
adopted as follows:
General Fund (001)
City Council $ 317,000
Executive 445,000
Financial Services 1,421,400
Lega1 1,005,100
Human Resources 368,700
Community Development 1,300,600
I Municipal Court ',^'��1,406,800
City Auditor 158,400
Law Enforcement 10,671,700
Fire/Emergency Medical 8,143,900
I � ��� nnn2 �01,000
Police/Fire Pension ��
General Facilities 5�988819,000
General Parks 3,242,500
Engineering 321,000
1
2010 Budget
Non-Departmental �4-9883,742,000
I Ending Fund Balance 2,370,509
� Total General Fund ��
Arterial Street (101) 5,385,065
Street (102) 2,675,354
Contingency Reserve (103) 1,269,635
Lodging Tax (104) 410,699
Parking System (105) 2,095,163
Community Development Block Grant (106) 2,054,686
Abatement Revolving (108) 199,372
Police Special Projects (110) 1,147,311
Public Access Television (113) 344,431
Gift & Donations Fund (114) 84,526
Tria1 Improvement (116) 90,589
One Percent For Arts (117) ���2�9
Conference Center Operating (120) 1,817,598
Bond Fund (201) 1,404,618
Pazk Plaza Debt (203) �
Public Safety Bond (302) 2,283,003
Harborside Plaza & Commons (304) 1,247,000
Park Plaza. Construction (305) 8,500,000
General Government Capital Improvement (308) 2,875,071
Park Facilities Construction (310) 2,801,065
Boardwalk Project/Evergreen Park (311) 2,658,249
Water Utility (401) '" ,�� �-��20,663,320
Wastewater Utility (451) ''�
Stormwater Utility (481) 3
Gold Mountain Golf Complex (407) 3,629,560
Risk Management (503) 2,394,350
Equipment Rental Reserve — Operations & 2,363,006
Maintenance (509)
Equipment Rental Reserve — Equipment Reserves 6,325,488
(510)
Information Services (511) 1,254,270
I Total All Funds Q' �' �,�" ,'' g'' $144,424,284
SECTION 2. That the totals for the funds noted in Section 1 above and as set
forth in the official "City of Bremerton 2010 Annual Budget" adopted herein, are hereby
appropriated for the fiscal yeaz 2010.
2
2010 Budget
SECTION3. Effective January 1, 2010, the annual compensation of the
Municipal Court Judge shall be $134,625.00 which is 95% of the District & Superior Court
salaries as established on September 1, 2009:
SECTION4. Effective January 1, 2010, the base salaries of employees covered
under the "management, professional, confidential & fiduciary" pay plans shall be increased by
2.00% as a cost of living adjustment.
SECTION 5. Nothing contained herein shall be construed to require the City of
Bremerton or its officers to fill any vacancy in any of the positions established by this ordinance
resulting from the discharge, resignation or retirement of such employee. Nothing herein
contained shall require the City of Bremerton or its officers to pay the maximum amount
budgeted for any position shown therein.
SECTION 6. Severabilitv. If any one or more sections, subsections, or
sentences of this Ordinance are held to be unconstitutional or invalid, such decision sha11 not
affect the validity of the remaining portion of this Ordinance and the same sha11 remain in full
force and effect.
SECTION 7. Effective Date. This ordinance sha11 take effect and be in force ten
(10) days from and after its passage, approval and publication as provided by law.
PASSED by the City Council the day of , 2009
CECIL McCONNELL, Council President
Approved this day of , 2009
PATTY LENT, Mayor
ATTEST: APPROVED AS TO FORM:
CAROL ETGEN, City Clerk ROGER A. LUBOVICH, City Attorney
PUBLISHED the day of , 2009
EFFECTNE the day of , 2009
ORDINANCE NO.
R:�Legal�I,egal\Ordinances�Finance�2010 Budget Ordinance.doc
3
2010 Budget
ATTACHMENT A- ORD[NANCE NO. 5099
2010 REVENUE SOURCES - ALL FUNDS
BEG LIC. INTER- CHARGES FINES 2010
FUND AND GOV'T FOR AND OTHER TOTAL
FUND BAL. TAXES PERMITS REVENUE SERVICE FORFEITS REVENUE BUDGET
General Fund .
General Government:
City Council 106,000 106,000
Executive 115,000 115,000
Financial Services 3,388,000 331,000 640,100 4,359,100
Legal 436,000 436,000
Human Resources 123,300 123,300
Communiry Development 398,000 80,000 306,000 784,000
Municipal Court 15,000 358,700 560,000 20,000 953,700
City Auditor 55,000 55,000
Law Enforcement 3,000 1,099,000 438,000 1 i 11,000 1,562,000
Fire/Emergency Medical 1,472,000 212,000 620,000 10,000 2,314,000
Police & Fire Pension 45,000 45,000
General Facilities 77,000 46,000 123,000
Parks 606,000 147,000 753,000
Engineering 65,000 27,000 92,000
IVon-Departmental t 8,145,000 156,000 449,000 854,000 4,639,000 24,243,000
Begimm�g Fund Balance 2,370,509 2,370,509
Total General Fund 2,370,509 23,005,000 953,000 1,900,000 3,908,100 1,435,000 4,863,000 38,434,609
Soecial Revenue Funds:
Arterial Street 1,805,065 3,128,000 420,000 32,000 5,385,065
Street 63,354 275,000 590,000 426,000 1,321,000 2,675,354
Contingency Reserve 1,254,635 I5,000 1,269,635
Lodging Tax (301) 410,000 ],000 410,699
Parking System 277,163 25,000 250,000 1,543,000 2,095,163
Comm. Dev. Block Grant 529,522 1,493,164 20,000 12,000 2,054,686
Abatement Revolving Fund 196,372 3,000 199,372
Police Special Projects 1,019,311 38,000 90,000 1,147,311
Public Access Television 22,431 244,000 77,000 1,000 344,431
Gift & Donations Fund 76,526 8,000 84,526
Trial Improvement 66,589 24,000 90,589
One Percent for Arts 55,279 22,000 77,279
Conference Center Oper 262,098 1,341,500 214,000 1 817,598
Total Spec. Rev. Funds 5,628,044 685,000 244,000 5,235,164 2,309,500 288,000 3,262,000 17,651,708
Debt Service Fund:
Bond Fund 239,918 887,700 277,000 1,404,618
Park Plaza Debt 0 0
Total Debt Service Fund 239,918 887,700 0 0 0 0 277,000 1,404,618
a ital Im rovement Funds:
Public Safery Bond 1,158,003 I,125,000 2,283,003
Harborside Plaza & Common 7,137 1,239,863 1,247,000
Park Plaza Construction 0 8,500,000 8,500,000
General Govt Capital Improv. 25,071 600,000 2,250,000 2,875,071
Park Facilities Construction 451,065 1,600,000 750,000 2,801,065
Boardwalk Project 58,249 I 250,000 1 350,000 2,658,249
Total Capita! Improv. Funds 1,699,525 600,000 0 4,089,863 0 0 13,975,000 20,364,388
" ATTACHMENT A- ORDINANCE N0. 5099
2010 REVENUE SOURCES - ALL FUNDS
BEG LIC. INTER- CHARGES FINES 2010
FUND AND GOV'T FOR AND OTHER TOTAL
FUND BAL. TAXES PERMITS REVENUE SERVICE FORFEITS REVENUE BUDGET
Enterorise Funds:
Water Utility 5,843,320 8,677,000 6,143,000 20,663,320
Wastewater Utility 5,624,568 12,000 13,606,000 5,783,000 25,025,568
Stormwater Utility 2,730,398 2,098,000 85,000 4,913,398
Gold Mountain Golf Complex 252 060 3 328,500 49,000 3,629 560
Total Enterprise Funds i4,450,346 12,000 0 0 27,709,500 0 12,060,000 54,231,846
Internal Service Funds:
Risk Management 978,950 1,415,400 2,394,350
ER&R Operations & Maint. 375,006 1,984,000 4,000 2,363,006
ER&R Equipment Reserve 4,498,988 1,826,500 6,325,488
Informat�on Services 239 270 1,015,000 1,254 270
Total Internal Service Funds 6,092,214 0 0 0 2,999,000 0 3,245,900 12,337,114
Total Non-Generxl Funds 28,110,047 2,184,700 244,000 9,325,027 33,018,000 288,000 32,819,900 105,989,674
TotalAllFunds 30,480,557 25,189,700 1,197,000 11,225,027 36,926,100 1,723,000 37,682,900 144,424,284
Revenue Sources - All Funds
OtherRevenue
Fines & Forfeits $37,682,900
$1,723,000 26%
�% Beginning Fund
Balance
' $30,480,557
�._
- _�.�t?'.:�.; 21%
Charges for Service
$36,926,100 ` -����� M�� �
�a:'�� � ° � Taxes
26% $25,989,700
Intergovernmental � ��/,
$11,225,027 Licenses 8 Permits
8% $1,197,000
1%
i
ATTACHMENT A- ORDINANCE NO. 5099
2010 EXPENDITURES - ALL FUNDS -
SUPPLIES & DEBT CAPITAL ENDING 2010
FUND PERSONNEL SERVICES SERVICE OUTLAY TRANSFERS FUND BAL. BUDGET
General Fund
General Government:
Ciry Council 298,000 19,000 317,000
Executive 269,000 176,000 445,000
Financial Services 997,600 423,800 � 1,421,400
Legal Department 890,100 115,000 1,005,100
Human Resources 277,400 91,300 368,700
Communiry Development 955,300 345,300 1,300,600
Mumcipal Court 909,000 457,800 40,000 1,406,800
Ciry Auditor 148,400 10,000 158,400
Law Enforcement 8,332,700 2,339,000 10,671,700
Fire/Emergency Medical 7,281,300 862,600 8,143,900
Police & Fire Pension 2,485,000 216,000 2,701,000
General Facilities 152,000 667,000 819,000
General Parks 2,146,000 1,080,400 16,100 3,242,500
Engineering 248,000 73,000 321,000
Non-Departmental 50,000 2,150,700 411,300 1,130,000 3,742,000
Ending Fund Balance 2,370,509 2,370,509
Total General Fund 25,439,800 9,026,900 467,400 0 1,130,000 2,370,509 38,434,609
Snecial Revenue Funds:
Arterial Street 3,000 112,000 4,113,000 1,157,065 5,385,065
Street 1,518,700 1,091,000 65,654 2,675,354
Contingency Reserve 250,000 1,019,635 1,269,635
Lodging Tax 225,000 185,000 699 410,699
Parking System 658,000 275,000 450,000 435,000 277,163 2,095,163
Comm. Dev. Block Grant 172,700 1,027,300 120,000 734,686 2,054,686
Abatement Revolving Fund 77,000 122,372 199,372
Police Special Projects 504,700 642,611 1,147,311
Public Access Television 221,000 38,700 33,000 25,000 26,731 344,431
Gift & Donations Fund 9,700 74,826 84,526
Triallmprovement 52,000 38,589 90,589
One Percent for Arts 60,000 17,279 77,279
Conference Center Oper 82,000 1,469,000 266,598 1,817,598
Total Spec. Rev. Funds 1,997,400 5,264,400 275,000 4,656,000 I,O15,000 4,443,908 17,651,708
Debt Service Fund:
Bond Fund 1,178,350 226,268 1,404,618
Park Plaza Debt 0 0
Total Debt Service Fund 0 0 1,178,350 0 0 226,268 1,404,618
Caaital Imorovement Funds:
Public Safety Bond 61,000 2,22I,800 203 2,283,003
Harborside Plaza & Common 1,247,000 0 1,247,000
Park Plaza Construction 8,500,000 0 8,500,000
General Govt Capital Improv. 378,000 2,440,000 57,071 2,875,071
Park Facilities Construction 13,200 2,130,000 657,865 2,801,065
Boardwalk Project 2,535,000 123,249 2,658 249
Total Capital Improv. Funds 0 61,000 391,200 16,633,800 2,440,000 838,388 20,364,388
" ATTACHMENT A- ORDINANCE N0. 5099
� 2010 EXPENDITURES - ALL FUNDS
SUPPLIES & DEBT CAPITAL EIVDING 2010
FUND PERSOIVIYEL SERVICES SERVICE OUTLAY TRANSFERS FUND BAL. BUDGET
Enterorise Funds:
Water Utiliry 4,150,000 3,363,559 752,000 7,080,000 1,287,000 4,030,761 20,663,320 •
Wastewater Utility 3,207,000 3,295,274 3,185,000 8,855,000 2,106,000 4,377,294 25,025,568
StormwaterUtility 1,224,000 599,498 16,000 540,000 424,000 2,109,900 4,913,398
Gold Mountain Golf Complex 3,037,000 105,000 15,000 162,000 310,560 3,629,560
Total Enterprise Funds 8,581,000 10,295,331 4,058,000 16,490,000 3,979,000 10,828,515 54,231,846
Internal Service Funds:
Risk Management 230,000 1,185,400 978,950 2,394,350
ER&R Operations & Mamt 629,000 1,239,700 494,306 2,363,006
ER&R Equipment Reserves 473,000 5,852,488 6,325,488
Information Services 548,000 498,600 50,000 157 670 1,254 270
Total Internal Service Funds 1,407,000 2,923,700 0 523,000 0 7,483,414 12,337,114
Total Non-General Funds I 1,985,400 18,544,431 5,902,550 38,302,800 7,434,000 23,820,494 105,989,675
Total Ail Funds 37,425,200 27,571,331 6,369,950 38,302,800 8,564,000 26,191,003 144,424,284
Expenditures - All Funds
Transfers
$8,564,000
6%
Capital Outlay Ending Fund Balance
$38,302,800 � $26,191,003
,'_e: ��'•u'�<:�.�
27% =�€ . �t 's:. � 18%
_ _ ���;5'-
, �c°,���sti�; ;�r-�,`
. ��,
� ; � x � - . ��� � "� Personnel
Debt Service $37,425,200
$6,369,950 26%
Supplies 8 Services
4 % $27,571,331
19%
CITY OF BREMERTON
SALARY SCHEDULE AND JOB CLASSIFICATION
ELECTED OFFICIALS
2010
ANNUAL
JOB CLASSIFICATION COMPENSATIOy
COUNCIL PRESIDENT 13,800
COUNCIL MEMBERS 12,000
MAYOR 120,024
MUNICIPAL COURT JUDGE * 134,625
* Based on 95% Parity Adjustment
CITY OF BREMERTON
MANAGEMENT SALARY PLAN - 2010
CPI Adjusted Base 2.009�6 • Effective 1-1-10
PAY SALARY
BAN TITLE BASE RATE 1 RATE 2 RATE 3 RATE 4 RATE 5 RATE 6 RATE 7 RATE 8
23 POLICECHIEF MONTH 9,515.94 9,98768 10,247.84 10,50384 10,766.42 11,03558 11,31754 11,594.30
CITYATTORNEY SEMI-MONTH 4,757.97 4,988.84 5,123.82 5,251.82 5,383.21 5,517.79 5,655.77 5,797.15
NUAL 114,191.28 119,872.16 122,971.68 126,046.08 129,197.04 132,426.96 135,738.48 139,131.60
e s e • � a � . � � : , ,rr,._ ��- � „�
,�.;r
22 DIRECTOR OF fINANCIAL SERVICES MONTH 9,057.42 � 9,515.94 9,753.84 8,997.68 10,247.64 10,503.84 ' 10,766.42 11,035 58
DIRECTOR OF PUBIIC WORKS 8 UTILITIES SEMI-MONTH 4,528.71 4,757.97 4,876.92 4,998.84 5,123.82 5,251.92 5,383.21 5,517.79
FIRE CHIEF ANNUAL 108,688.04 114,191.28 117,046.08 119,972.16 122,971.68 126,046.08 129,197.04 132,426.96
REDEVELOPMENT PROJECTS ADMINISTRATO a a • _ ' � r . ' � : �" � � '' � • ' '� •' � � : H . , ,, „r�,��`'������ ,,
21 DIRECTOR OF COMMUNITY DEVELOPMENT MONTH 8,627.00 9,057.42 9,283.86 9,515.94 � 9,753.84 9,997 68 10,247.64 10,503.84
SEMI-MONTH 4,310.50 4,528.71 4,641.93 4,757.97 4,876.92 4,998 84 5,123 82 5,251 92
ANNUAL 103,452.00 108,688.04 111,406.32 114,191.28 117,046.08 118,972.16 122,971.68 126,046.08
s e • '�' - - .:h� ,�, �+�'" � • � Aa � . st':�' �S4 � �, :'e�,. � � .
20 ASSISTANT FIRE CHIEF MONTH 8,205.60 8,621.00 8,838.52 8,057.42 9,283.86 9,515.94 9,753.84 9,997.68
CITY ENGINEER SEMI-MONTH 4,102.80 4,310.50 4,418.26 4,528 71 4,641.93 4,757.97 4,876.92 4,998 84
DIRECTOR OF PARKS & RECREATION ANNUAL 98,a67.20 103,452.00 106,038.24 108,688.04 111,406.32 114,191.28 117,046.08 119,972.16
HUMAN RESOURCE MANAGER • s • ,, � 2 -r :� • , 4,,,, `y� - , ; .,,�...-
19 ASSISTANT CITY ATTORNEY III MONTH 7,810.20 8,205.60 8,410.74 8,621.00 8,836.52 9,057.42 9,283.86 9,515.94
SEMI-MONTH 3,905.10 4,102.80 4,205.37 4,310.50 4,418.26 4,528.71 4,647.93 4,757 97
ANNUAL 83,722.40 98,467.20 ' 100 928.88 103,452.00 106,038.24 108,689.04 111,406.32 114,191.28
e o e � � `. - s " ..� 4.. - k, �k�:�.�2 Y'' ' • �
5� '��t i�+.
_�
18 MONTH 7,433 86 7,810 20 8,005.48 M 8,205 60 8,410.74 8,621 00 8,836.52 9,057 42
SEMI-MONTH 3,716.94 3,905.10 4,002.74 4,102.80 4,205.37 4,310 50 4,41826 4,528 71
ANNUAL 89,206.56 83,722.40 86,065.76 98,467.20 100,928.88 103,452.00 106,038.24 108,689.04
• D • 'J � i .� �'.�..a,�, i. tY fi:` :�.. �� ��� i;l
17 ASSISTANT CI7Y AITORNEY II MONTH 7,075.68 7,433 88 7,619.70 7,810.20 8,005.48 �8,205 60 8,410.74 8,621 00
CITY AUDITOR SEMI-MONTH 3,537.84 3,716.94 3,808.85 3,905.10 4,002 74 4,102 80 4,205.37 4,310 50
ANNUAL 84,908.16 89,206.56 91,436.40 83,722.40 96,065.76 98,467.20 100,828.88 103,452.00
o . • "'-s -_�,:,,�.r ' 'r �"�'� :�ar L�lMS.: .'�
� b�, `�'+i•' :1.2*'w x" r ' Y � L 1� . 1 .`j""� . i• �.
16 ASST COMMUNITY DEVELOPMENT DIRECTOR MONTH 6,734.74 7,075.68 7,252.54 7,433.88 7,619 70 7,870 20 8,005 48 T 8,205.60
FINANCE OFFICER SEMI-MONTH 3,367.37 3,537.84 3,626.27 3,716.94 3,809.85 3,905 10 4,002.74 4,102 80
FORESTRY MANAGER ANNUAL 80,816.88 84,908.16 87,030.48 69,206.56 91,436.40 93,722.40 86,065.76 98,467.20
INfORMATION SYSTEMS MANAGER o o • -�- "� � � �= � � +. � �*' ' .` � . � k
MANAGING ENGINEER
PUB�IC WORKS OPERATIONS MANAGER
RISK MANAGER
UTILITY OPERATIONS MANAGER
WASTEWATER MANAGER
WATER RESOURCE MANAGER
15 COURT SERVtCES ADMINISTRATOR MONTH 6,410 22 6,734.73 6,903.12 7,075.68 7,252 54 7,433 88 7,679.70 7,810.20
PROJECT MANAGER SEMI-MONTH 3,205.11 3,367 37 3,451.56 3,537.84 3,626.27 3,7t6.94 3,809.85 3,905.10
ANNUAL 76,922.64 80,816.81 82,837.44 84,808.16 87,030.46 89,206.56 91,436.40 93,722.40
' ��. t ` :-�E � ,.
9 � e - � : �. - � 1.`r�-�i�. �._as.�.. �
CITY OF BREMERTON
MANAGEMENT SALARY PLAN - 2010
CPI Adjusted Base 2.0096 - Effective 1-1-10
14 ASSISTANT FINANCE OFF�CER MONTH 6,101.32 6,410.22 6,570.48 6,734.74 6,903.12 7,075.68 7,252.54 7,433.88
CITY CLERK SEMI-MONTH 3,050.66 3,205.11 3,285.24 3,367.37 3,451.56 3,537.84 3,626.27 3,716.94
PUBLIC WORKS 8 UTILITY FINANCE MANAGER ANNUAL 73,215.84 76,922.64 78,845.76 80,816.88 82,837.44 84,908.16 87,030.48 89,206.56
o � e � � �,v � �. ���
s� � :�. ��;
13 ASSISTANT CITY ATTORNEY I MONTH 5,807.32 6,101.32 6,253.86 6,410.22 6,570.48 6,734.74 6,903.12 7,075.68
FLEET MANAGER SEMI-MONTH 2,903.66 3,050.66 3,126.93 3,205.17 3,285 24 3,367.37 3,451.56 3,537.84
ANNUAL 69,687.84 73,215.84 75,046.32 76,822.64 78,845.76 80,816.88 82,837.44 84,908.16
• � e z� 5 � � � : � e` ;: •:�; � �:
12 ATHLETICS/RECREATION MANAGER MONTH 5,527.50 5,807.32 5,952 52 6,101.32 6,253.86 6,410 22 6,570.48 6,734 74
PARKS MAINTENANCE MANAGER SEMI-MONTH 2,763.75 2,903.66 2,976.26 3,050.66 3,126 93 3,205 11 3,285 24 3,367.37
POLICE SUPPORT MANAGER NUAL 66,330.00 69,687.84 71,430.24 73,215.84 75,046.32 76,922.64 T8,845.76 80,816.88
O e Y L,a "'`� t ,.t. 1 1 �� �. �`..c �'r'. =ke �.�''' .�
71 PARK DEVELOPMENT PLANNER MONTH 5,261.16 5,527.50 5,665.68 ; 5,807.32 5,952.52 6,101 32 6,253 86 6,410.22
PUBLIC ACCESS MANAGER SEMI-MONTH 2,630.58 2,763.75 2,832.84 2,903.66 2,976.26 3,050.66 3,126 93 3,205 11
ANNUAL 63,133.92 66,330.00 67,988.16 69,687.84 71,430.24 73,215.84 75,046.32 76,922.64
o n • .,� � � � - ' ��r _ _ • � ,:€n � � : .'�c: :,�:. �
10 MONTH 5,007.62 5,261.16 5,392.70 5,527.50 V 5,665.68 5,807.32 Y 5,952.52 6,701 32
SEMI-MONTH 2,503.81 2,630.58 2,696.35 2,763.75 2,832 84 2,903 66 2,976.26 3,050 66
ANNUAL 60,091.44 63,133.92 64,T12.40 66,330.� 67,988.16 69,687.84 71,430.24 73,215.84
o � • ��; s, � � � .a'z^ � _ . � . � '� a- ;�5�• � a � . � �� �5.,7" ' � ;��. . �
9 MONTH 4,766.34 5,007.62 5,132.82 5,261.16 5,392.70 5,527.50 5,665.68 5,807.32
SEMI-MONTH 2,383.17 2,503.81 2,56641 2,630.58 2,69635 2,763.75 2,832.84 2,903.66
ANNUAL 57,196.08 60,091.44 61,593.84 63,133.92 64,712.40 66,330.00 67,988.16 69,687.64
• o � a - _ i � - � � � • ta. ;� i ,�. .:,,,` � � t� "`. �� �. :;a�
8 MONTH 4,536.68 4,766.34 . 4,885 50 5,007.62 5,132.82 5,261 16 5,392 70 N 5,527 50
SEMI-MONTH 2,268.34 2,383.17 2,442.75 2,503.61 2,566 41 2,630.58 2,696.35 2,763.75
ANNUAL 54,440.16 57,186.08 58,626.00 60,081.44 61,593.84 63,133.92 64,712.40 66,330.00
• � e _�„ _ • � _ - + i � � � _ _ � ,,.� � s . � ��c. �
'�u.
7 MONTH 4,318.06 4,536.68 4,650.08 4,768.34 z 4,885.50 5,007.62 5,132.82 � 5,261.16
SEMI-MONTH 2,159.03 2,268.34 2,325 04 2,383.17 2,442.75 2,503 81 2,566.4t 2,630.58
NUAL 51,816.72 54,440.16 55,800.86 57,196.08 58,626.00 60,091.44 61,593.84 63,133.92
o � o .,c.. ' � ,�' � � a �.. +`€= � � � `� �. :�S„�' � K�"i.. �.�: �
6 MONTH 4,109.98 4,318.06 4,426.02 4,536.68 4,650 08 4,766 34 4,885.50 5,007.62
SEMI-MONTH 2,054.99 2,159.03 2,213.01 2,268.34 2,325.04 2,383.17 2,442.75 2,503.81
ANNUAL 49,319.76 51,816.M 53,112.24 54,440.16 55,800.86 57,196.08 58,626.00 60,091.44
o � • ' '� �; � �.�/ .}' - - r"a" • � ` ''�i , �; • � � c 'y" . � ` ' ° i m��' � �
"`� � .. �«' .^k.:._ .=.bc� �-. �d4+1,: .-.s+'af �,�:ow
5 MONTH 3,911.94 4,109.98 4,212.76 4,318.06 4,426 02 4,536.68 4,650 OB 4,766.34
SEMI-MONTH 1,955.97 2,054.99 2,106.38 2,159.03 2,213 Ot 2,268 34 2,325.04 2,383 17
ANNUAL 46,943.28 49,319.76 50,553.12 51,816.72 53,112.24 54,440.16 55,800.96 57,196.08
• s e .i�>.. � a i , ' � ��"'4�,�• � � >..
4 MONTH 3,723.44 3,911.94 4,009 74 4,109.98 � 4,212 76 4,318 06 4,426.02 4,536 68
SEMI-MONTH 1,861.72 1,955.97 2,004.87 2,054.99 2,106 38 2,159 03 2,213.01 2,268 34
ANNUAL 44,681.28 46,943.28 48,116.88 49,319.76 50,553.12 51,816.72 53,112.24 54,440.16
e � s ��;, :� � `%s.�- .�,�.e. :�,r �. y - _ .,
CITY OF BREMERTON
PROFESSIONAL, CONFIDENTIAL 8 FIDUCIARY PAY PLAN - 2010
CPI Adjusted Base 2.00% - Effective 1-1-10
PAY SALARY
BAN TITLE BASE RATE 1 RATE 2 RATE 3 RATE 4 RATE 5 RATE 6 RATE 7 RATE 8
22 MONTH 9,057.42 9,515.94 9,753.84 9,997.68 10,247.64 10,503.84 10,766.42 11,035 58
SEMI-MONTH 4,528.71 4,757.97 4,876.92 4,998.84 5,123 82 5,251 92 5,383 21 5,517 79
' ANNUAL 108,689.04 114,191.28 117,046.08 119,972.16 122,971.66 126,046.08 129,197.04 132,426.96
• � • •� �: r• � �: �
21 MONTH 8,621.00 9,057.42 9,283.86 9,515.94 9,753 84 9,997 68 10,247 64 10,503.84
SEMI-MONTH 4,310.50 4,528.71 4,641.93 4,757.9� 4,876.92 4,998.84 5,123.82 5,251.92
ANNUAL 103,45T.00 108.689.04 111,406.32 114,181.28 117,046.08 119,972.16 122,971.68 126,046.08
• • � • •� �: �• � �:
20 MONTH 8,205 60 8,621.00 8,836.52 8,057.42 9,283.86 9,515.94 9,753 84 9,997 68
SEMI-MONTH 4,102.80 4,310.50 4,418 26 4,528.71 4,641.93 4,757.97 4,876.92 4,998.84
ANNUAI 88,467.20 103,452.00 106,038.24 108,688.04 111,406.32 114,181.28 117,046.08 119,972.16
• � • •� �:
19 MONTH 7,810.20 8,205 60 8,410 74 8,621.00 8,836.52 9,057 42 9,283.86 9,515 94
SEMI-MONTH 3,905.10 4,102 80 4,205.37 4,310.50 4,41826 4,528.71 4,647.93 4,757 97
ANNUAL 83,722.40 98,467.20 100,928.88 103,452.00 1�,038.24 108.688.04 111,d06.32 114,191.28
• � • � •�
18 MONTH 7,433.88 7,810.20 8,005.48 8,205.60 8,410 74 8,621 00 8,836.52 9,057 42
SEMI-MONTH 3,716.94 3,905.10 4,002.74 4,102.80 4,205 37 4,310 50 4,418.26 4,528 71
/►NNUAL 88,206.56 93,722.40 96,065.76 98,467.20 100,928.88 103,452.00 106,038.24 108,689.04
• � • � .�
17 MONTH 7,075.68 7,433.88 7,619.70 7,810.20 8,005 48 8,205 60 8,410 74 8,621.00
SEMI-MONTH 3.537.84 3,716.94 3,809.85 3,905.10 4,002.74 4,102.80 4,205.37 4,310 50
ANNUAL 84 908.16 89 206.56 91,436.40 93,722.40 96 065.76 88 467.20 100,928.86 103,452.00
• � • � .�
16 MONTH 6,734.74 7,075.68 7,252 54 7,433.88 7,619.70 7,810.20 8,005 48 8,205 60
SEMI-MONTH 3,367.37 3,537.84 3,62627 3,716.94 3,809.85 3,905.10 4,002.74 4,102.80
NUAL 80,816.88 84,908.16 ' 87,030.48 88,206.56 91,436.40 93 722.40 96,065.76 98,467.20
• � • � � .�
75 MONTH 6,410.22 6,734.73 6,903 12 7,075.68 7,252 54 7,433 88 7,619 70 7,810.20
SEMI-MONTH 3,205 11 3,367.37 3,451.56 3,53T.84 3,626 27 3,716 94 3,809 85 3,905 10
ANNUAL 76,922.64 80,816.81 82,837.44 84,908.16 87,030.48 89,206.56 91,436.40 93,722.40
• � • � �. � �
14 MONTH 6,101.32 6,410 22 6,570.48 6,734.74 6,903.12 7,075 68 7,252 54 7,433 88
SEMI-MONTH 3,050.66 3,205.11 3,285.24 3,367.37 3,451.56 3,537 84 3,626 27 3,716 94
ANNUAL 73,215.84 76,922.64 78,845.76 80,876.88 82,837.44 84,908.16 87,030.48 89,206.56
•� • � � :�. �
13 MONTH 5,807.32 6,101.32 6,253.86 6,410.22 6,570.48 6,734 74 6,903 12 7,075 68
SEMI-MONTH 2,903.66 3,050.66 3,126.93 3,205.11 3,285.24 3,367.37 3,451.56 3,537 84
ANNUAL 69,687.84 73,215.84 75,046.32 76,922.64 78,845.76 80,816.88 82,837.44 84,908.16
•� • � �: � :�.
CITY OF BREMERTON
PROFESSIONAL, CONFIDENTIAL 8 FIDUCIARY PAY PLAN - 2010
CPI Adjusted Base 2.0096 - Effective 1-1•10
12 CDBG AdmmisVator MONTH 5,527.50 5,807.32 5,952.52 6,101.32 6,253.86 6,410 22 6,570.48 6,734 74
R�sk Management Special�st SEMI-MONTH 2,763.75 2,903.66 2,976.26 3,050.66 3,126.93 3,205 11 3,285.24 3,367 37
ANNUAL 66,330.00 69,687.84 71,430.24 73,215.84 75,046.32 76,922.64 78,845.76 80,816.88
•� • � •i � �• �
11 AdminisUaOve Anayst MONTH 5,261.16 5,527.50 5,665.68 5,807.32 5,952.52 6,101.32 6,253 86 6,470 22
Executive Assistant SEMIOMONTH 2,630.58 2,763.75 2,832 84 2,903.66 2,97626 3,050.66 3, t 26 93 3,205 11
Legisla6ve Assistant ANNUAL 63,133.9T 66,330.00 67,988.16 68,687.84 77,430.24 73,215.84 75,046.32 T6,922.64
Paralegal • . • i � • � � � : �
Senior Planner
10 Budget Malyst MONTH 5,007.62 5,261.16 5,392.70 5,527 50 5,665 68 5,807.32 5,952.52 6,101 32
CDBG Coordinator SEMI-MONTH 2,503.81 2,630.58 2,686.35 2,763.75 2,832.84 2,903.66 2,976.26 3,050 66
HR Analyst ANNUAL 60,091.44 63,133.92 64,712.40 66,330.00 67,988.16 69,687.84 71,430.24 73,215.84
ProSeCUtot 11 • � • � � � i : � • � �
9 MONTH 4,766.34 5,007.62 5,132 82 5,261.16 5,392.70 5,527 50 5,665.68 5,807.32
SEMI-MONTH 2,383.17 2,503.81 2,566.41 2,630.58 2,696.35 2,763.75 2,832.84 2,903.66
ANNUAL 57,196.08 60,091.44 61,583.84 63,133.92 64,712.40 66,330.00 67,988.16 69,687.84
• � • �� � � � �
8 BKAT ProducUOn Administrator MONTH 4,536.68 4,766.34 4,885.50 5,007.62 5,132 82 5,261.16 5,392.70 5,527.50
Cwil Serv�ce OfficedHR Assistant SEMI-MONTH 2,268 34 2,383.17 2,442.75 2,503.81 2,566.41 2,630.58 2,696 35 2,783 75
CounaVAuditor Assistant ANNUAL 54,440.16 57,196.08 58,626.00 60,091.44 61,593.84 63,133.92 64,712.40 66,330.00
• � • •� �� � � � �
7 Prosecutor l MONTH 4,318.06 4,536.68 4,650.08 4,768.34 4,885.50 5,007.62 5,132.82 5,261 16
SEMI-MONTH 2,159.03 2,268.34 2,325.04 2,383.17 2,442 75 2,503.81 2,566 41 2,630.58
ANNUAI. 51,816.72 54,440.16 55,800.86 57,196.08 58,626.00 60,091.44 61,593.84 63,133.92
• � • •� �� �� i �
6 MONTH 4,109.98 4,318 O6 4,426.02 4,536.68 4,650.08 4,766 34 4,885.50 5,007 62
SEMI-MONTH 2,054.99 2,159.03 2,213.01 2,268.34 2,325.04 2,38317 2,442.75 2,503.81
ANNUAL 49,319.76 51,816.72 53,112.24 54,440.16 55,800.96 57,196.08 58,626.00 60,091.44
• � • � •� �� ��
5 Legal Assistant II MONTH 3,911.94 4,109 98 4,272.76 4,318.06 4,426.02 4,536.68 4,650 08 4,766 34
SEMI-MONTH 1,955.97 2,054 99 2,106.38 2,159.03 2,213.01 2,268.34 2,325.04 2,383 17
ANNUAL 46,843.48 49,319.76 50,553.12 51,816.72 53,112.24 54,440.16 55,800.96 57,196.08
• � • i •� ��
4 Legal Ass�stant I MONTH 3,723.44 3,911.94 4,009.74 4,109.98 4,212.76 4,318 06 4,426 02 4,536 68
SEMI-MONTH 1,881.72 1,955.97 2,004.87 2,054.99 2,106.38 2,15903 2,213.01 2,26834
ANNUAL 44,681.28 46,943.28 48,116.88 49,319.76 50,553.12 51,816.72 53,112.24 54,440.16
• � • :� � •�
3 MONTH 3,546.16 3,723.44 3,816.54 3,911.94 4,009 74 4,109 98 4,212 76 4,318 06
SEMI-MONTH 1,773.08 1,861.72 1,908.27 1,955.97 2,004 87 2.054.99 2.106.38 2,159 03
ANNUAL 42,553.92 44,681.28 45,788.46 46,843.28 48.116.88 49,319.76 50,553.12 51,816.72
• � • i :� �
_�
Personnel
Monthly Selary Range
Function/Department 2004 2005 2006 ?007 2008 2009 2010 Low Hi�
City Council
City Council 9.00 9.00 9.00 9.00 9.00 9.00 9.00 a1,000 $1,150
Legislative Assistant 1.00 I.00 I.00 1.00 1.00 1.00 I.00 55,261 $6,410
CounciVAuditor Assistant 1.00 1.00 I.00 1.00 I.00 1.00 1.00 $4,537 $5,328
To�al Ciry Counci! l l.00 ! l.00 ! 1.00 1 l.00 / 1.00 / 1.00 1 l.00
Ececu tive
Mayor 1.00 1.00 t.00 I.00 l.00 1.00 I.00 S 10,002 S t 0,002
Execiaive Assistant I.00 1.00 1.00 1.00 1.00 1.00 t.00 55,261 $6,410
TowlExecutive 2.00 ?.DO ?.00 2.00 2.00 2.00 1.00
Fiaancial Services
Director of Financia! Services 1.00 1.00 1.00 1.00 1.00 I.00 I.00 $9,037 $ I I,03b
Finance Officer 1.00 1.00 1.00 1.00 1.00 1.00 1.00 $6,733 $8,206
City Clerk 1.00 1.00 1.00 1.00 l.00 1.00 I.00 $6,101 $7,434
Depirty City Cleck - - - - I.00 I.00 1.00 $4,105 $4,830
Assistant FinanceOfficer 1.00 1.00 1.00 1.00 1.00 - - $6,101 $7,434
Bud�et Analyst 1.00 I.00 1.00 1.00 1.00 1.00 I.00 SS,008 $6,101
Oftice Assistant Sr. Spec. 1.00 1.00 1.00 1.00 - - -
Accounting Assistant Sr. 3.00 3.00 3.00 3.00 4.00 3.00 3.00 $3,684 $4,333
Accounting Assistant II 2.00 2.00 2.00 2.00 - 2.00 2.00 $3,318 $3,88'7
Payroll Specialist 1.00 1.00 1.00 1.00 1.00 I.00 1.00 $3,684 $4,333
Customer Service [Lepresentative - - - - I.00 - - $3,146 $3,684
Part-Time Cterical - - - - 0.38 0.38 0.38
TotalFinancialServices l2.00 /2.00 12.00 /2.00 /2.38 !l.38 /1.38
Humen Resources
Hwnan Resoiuces Mana�er 1.00 1.00 1.00 1.00 1.00 1.00 1.00 58,206 $9,998
Human Reso�vicesAnalyst I.00 1.00 1.00 1.00 1.00 1.00 I.00 $5,008 $6,101
Civil Service OfficerMR Assistant 1.00 1.00 1.00 I.00 I.00 - - $4,337 $3,528
Total Human Resources 3.00 3.00 3.00 3.00 3.00 2.00 2.00
Legal
City Attorney I.00 1.00 I.00 1.00 1.00 (.00 1.00 $9,St6 $11,594
Assistant City Attorney (I 2.00 1.00 2.00 2.00 2.00 2.00 2.00 57,076 $8,621
Assistant City Attorney [ - - - - - 1.00 I.00 $5,807 $7,076
Proseciuor tl - - - - - - 1.00 Si $6,101
Prosecutor I - - - - - 1.00 - $4,318 $5,261
Risk Manager 1.00 1.00 1.00 I.00 I.00 - - 56,735 $8,206
Risk �tanagement Specialist - - - - - I.00 1.00 $5,528 $6,735
Paralegal - 1.00 1.00 I.00 I.00 l.00 - $3,26t �6,410
Le�l Assistant [1 1.00 - - - - 1.00 2.00 $3,912 $4,766
Legal Assistant l - - 0.25 0.50 0.53 1.00 - 53,723 $4,i37
TotalLega! s.nn d.00 5.35 �.SO 5.55 9.00 s.nn
:�lunicipal Court
Municipal Court JuddBee 1.00 1.00 I.00 1.00 1.00 l.�0 I.00 $11,219 �11,219
Court Services Administrator 1.00 1.00 I.00 I.00 1.00 1.00 1.00 86,410 $7,810
Probation Officer I.00 1.00 I.00 1.00 I.00 1.00 I.00 $4,105 �4,830
Le�l Technician Sr. 1.00 I.00 I.00 1.00 1.00 I.00 I.00 �4,578 $i,392
l.e�l Technician 6.00 6.00 6.00 6.00 6.00 7.00 7.00 $3,318 $3,887
Total;�hrnicipalCotrrt rn.no rn.nn l0.00 l0.00 in.no 1/.00 I1.00
12
Personnel
Monthly Salary Ranee
F�ction/Department 2004 2005 2006 2007 2008 2009 2010 Low High
Community Development
Director of Community Development 1.00 1.00 I.00 1.00 1.00 1.00 I.00 $8,621 $10,304
Assistant Director - - - 1.00 1.00 1.00 1.00 $6,735 $8,206
Planning Mana�er 1.00 1.00 I.00 - - - -
Development Manager I.00 I.00 I.00 - - - -
Senior Pianner (l - - - 2.00 2.00 - • $5,261 $6,410
Office Assistant Sr. Spec. - - 1.00 I.00 1.00 I.00 I.00 $3,684 54,333
Office Assistant Sr. 1.00 1.00 - . _ . .
Code Enforcement O�cer - - - 1.00 1.00 (.00 1.00 $5,097 $6,026
Project Assistant - - - - - - t.00 $3,684 $4,333
Planner II - - - I.00 1.00 1.00 1.00 $5,097 $6,026
Planner 1 3.00 4.00 4.00 2.00 2.00 2.00 2.00 $4,578 53,392
Building Development Specialist iIl - - - 1.00 I.00 1.00 1.00 $5,097 $6,026
BuildingDevelopment Specialist II 3.00 3.00 3.00 1.00 1.00 1.00 1.00 $4,5�8 $5,392
Building Development Specialist 1 2.00 2.00 2.00 2.00 2.00 1.00 1.00 $3,887 $4,578
To�al Communiry Deve%pment 12.00 13.00 /3.00 l3.00 /3.00 /0.00 / 1.00
Police Department
Police Chief I.00 1.00 I.00 1.00 1.00 1.00 1.00 $9,516 $11,594
Police Captain 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $8,816 $9,637
Police Lieutenant 3.00 3.00 3.00 3.00 3.00 3.00 3.00 $7,740 58,461
Police Ser�eant 7.00 7.00 8.00 8.00 8.00 8.00 8.00 56,669 $7,254
Potice Ofticer 49.00 49.00 49.00 52.00 52.00 52.00 49.00 $4,999 $6,469
Court Home Detention Specialist 1.00 1.00 1.00 I.00 1.00 1.50 1.50 $4,105 $4,830
Warrant Server 3.00 3.00 3.00 3.00 3.00 2.00 2.00 $4,105 $4,830
Police Suppon Mana�er - - 1.00 1.00 1.00 1.00 1.00 $5,528 $6,735
Administrative Analyst 1.00 1.00 - - - - -
Police Recordc Specialist [I 4.00 5.00 • 5.00 5.00 5.00 5.00 5.00 $3,497 S4, I05
Police Records Specialist I 1.00 - - - - - -
Oftice Assistant Sr. 4.00 4.00 4.00 4.00 4.00 4.00 3.00 $3,318 $3,887
Traftic Safety Officer I.00 - - - - - -
Evidence Property Control Specialist - - - 1.00 1.00 1.00 1.00 $3,146 $3,684
Lead Evidence Property Control Specialist - - - 1.00 1.00 1.00 1.00 $3,318 $3,887
Community Relations 8c [nformation Specialist - I.00 1.00 I.00 1.00 1.00 1.00 $4,578 $5,392
Total Police Deparrment 77.00 77.00 78.00 83.00 83.00 82.50 78.50
Fire Depertment
Fire Chief I.00 I.00 1.00 1.00 1.00 1.00 I.00 $9,057 $I 1,036
Assistant Fire Chief 1.00 I.00 1.00 1.00 I.00 1.00 1.00 $8,206 $9,998
Battalion Chief 1.00 I.00 1.00 I.00 1.00 t.00 4.00 58,654 $9,036
Fire Captain 3.00 3.00 3.00 3.00 3.00 3.00 3.00 $7,890 $8,463
F've Captain - Deputy Fire Marshal 1.00 1.00 t.00 I.00 I.00 I.00 1.00 $7 $8,463
Fire Captain - Medical Officer I.00 I.00 1.00 1.00 I.00 I.00 I.00 $7,890 $8,463
Firefighter/Fire Prevention 2.00 2.00 2.00 2.00 2.00 I.00 I.00 $7,318 ,$7,700
Fire Lieutenant 9.00 9.00 12.00 13.00 13.00 t 3.00 10.00 $7,318 �7,700
Firefighter 22.00 I6.00 13.00 12.00 12.00 18.00 15.00 $4 ,asa $6,3b3
Firefighter/SCBA - 3.00 3.00 3.00 3.00 3.00 3.00 $4,632 $6,618
FirefighterlEquipment Maintenance - 3.0� 3.00 3.00 3.00 3.00 3.00 $4,632 56,618
Paramedic/firefighter 13.00 I 5.00 I 5.00 I5.00 I5.00 15.00 I5.00 ��,011 $7, I39
Office Assistant Sr. Spec. 1.00 I.00 1.00 I.00 L00 1.00 L00 $3,684 $4,333
Office Assistant lt I.00 1.00 I.00 I.00 1.00 - - $2,989 53,497
TotalFireDepnrtment 58.00 ss.nn .i8.00 ss.nn 58.00 62.00 .i9.00
13
� Personnel
Monthly Selary Ran�e
Punction/Department 2004 2005 2006 2007 2008 2009 2010 Low High
Ciry Auditor
City Auditor I.00 1.00 I.00 1.00 1.00 1.00 1.00 57.076 $8,621
TotalCiry.-tuditor I.00 /.00 I.00 /.DO 1.00 i.nn l.00
Parks & Recreation
DirectoroE'Parks& Recreation I.00 1.00 t.00 I.00 I.00 1.00 1.00 $8,206 $9,998
Parks Development Planner - - I.00 I.00 I.00 1.00 1.00 $5,261 $6,410
Administrative Analyst I.00 1.00 - - - - -
Parks Maintenance Manager t.00 l.00 1.00 I.00 I.00 I.00 1.00 $5,528 $6,733
Athletics/Recreation Mana�er t.00 1.00 I.00 I.00 1.00 1.00 1.00 $3,528 $6,735
Recreation Manag�r 1.00 - - - - - -
Parks Maintenance S�ervisor - 1.00 1.00 1.00 I.00 1.00 1.00 $5,392 $6,367
Contract Administrato� 1.00 1.00 - • - - -
Professional/Mana�ement - - - - 0.53 0.53 - $3,093 $3,093
Office Assistant III 1.00 1.00 1.00 1.00 I.00 1.00 1.00 $3,146 $3,684
Office Assistant II t.00 1.00 I.00 1.00 1.00 1.00 t.00 $2,989 $3,497
Parks Facilities Specialist 1.00 1.00 1.00 I.00 1.00 - - $4,830 $5,699
Parks Service Specialist Lead 1.00 - - - - - -
Parks Service Specialist, Sr. 6.00 4.00 4.00 4.00 4.00 4.00 4.00 $4, t05 $4,830
Parks Service Specialist 2.00 4.00 4.00 4.00 4.00 4.00 4.00 $3,684 $4,333
Parks Laborer - 5.25 5.25 5.50 S.SO 4.50 4.50 $2,694 $3,146
Recreation Prog�aam Coordinator II( 1.00 1.00 1.00 I.00 2.00 2.00 2.00 $4,103 $4,830
Recreation Prog�am Coordinator [[ 2.00 2.00 Z.00 2.00 2.00 2.00 2.00 $3,887 $4,578
Recreation Program Coordinator I 1.00 I.00 3.00 3.00 2.00 1.00 1.00 $3,318 $3,887
Towl Parkc & Recreation 22.00 26.25 27.25 27.50 28.05 25.05 24.50
Economic Developmeot
. Director of Economic Development 1.00 I.00 - - - - -
Redevelopment ProjectsAdministrator - - 1.00 1.00 I.00 1.00 - $9,057 $11,036
Office Assistant Sr. 1.00 1.00 I.00 I.00 - - -
Project Assistant - - - - 1.00 1.00 - $3,684 $4,333
Tota! Economic Development 2.00 Z. nn 2.00 2.00 2.00 1.00 -
Total Ceneral Fund 215.00 Z19Z5 222.50 228.00 228.98 228.93 219.38
Community Development Block Grsnt
Commw�ity Development Progams Administrator I.00 1.00 1.00 t.00 1.00 I.00 t.00 $5,528 $6,735
Community Development ProgramsCoordinator 1.00 I.00 I.00 1.00 I.00 (.00 1.00 $5,008 $6,101
Tota! Community Development Block Gront 2.00 2.00 2.00 2.00 2.00 2.00 2.00
BKAT
Pubtic Access Mana�er I.00 1.00 1.00 I.00 I.00 I.00 I.00 �5,261 $6,4 t 0
Prod�xtion Administrator - - 1.00 1.00 I.00 1.00 1.00 $4,537 $5,528
rorQ�a,�r r.00 i.on ?.00 Z.no ?.on z.no ?.nn
Park Plaza Con�truction Fund
Redevelopment ProjectsAdministrator - - - - - - I.00 $9,057 �I 1,036
Total Park Plam Construc�ion Fund - - - - - - I.00
14
Personnel
Monthly Selary RanBe
Function/Depanment 2004 2005 2006 2007 2008 2009 2010 Low High
Public Works & Utilities
Street Depsrtment
Public Works Operations MAna�er I.00 1.00 1.00 1.00 1.00 1.00 I.00 56,735 58,206
Electronics Supervisor I.00 1.00 I.00 I.00 (.00 1.00 1.00 $5,392 $6,367
Street Service Specialist Supervisor 2.00 2.00 2.00 2.00 2.00 2.00 2.00 SS,392 $6,367
Sign Shop Service Specialist Supervisor 1.00 1.00 I.00 I.00 1.00 1.00 I.00 $5,392 56,367
Electronics Technician 4.00 5.00 4.00 4.00 4.00 4.00 I.00 $4,830 $3,699
Jo�ney Electrician 1.00 I.SO 1.50 2.00 2.00 3.00 3.00 $4,830 55,699
Street Service Specialist Sr. 3.00 3.00 3.00 3.00 3.00 3.00 3.00 $4,333 $5,097
Street Service Specialist 5.00 5.00 5.00 5.00 5.00 3.00 3.00 $3,887 $4,578
Sign Shop Service Specialist Sr. 1.00 1.00 1.00 I.00 1.00 l.00 1.00 $4,333 $5,097
�gn 51�op Service Specialist t.00 1.00 1.00 1.00 1.00 I.00 - $3,887 $4,578
AccountingAssistant Senior - - t.00 I.00 1.00 1.00 $3,684 $4;333 -
Tota! Str�eet Department 20.00 21. SD 21. SO 22. 00 22. DD 2/.00 / 7.00
Engineering
City Engineer 1.00 I.00 I.00 1.00 1.00 1.00 1.00 $8,206 $9,998
Managing Engineer 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $6,735 $8,206
Project Mana�eer 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $6,410 $7,810
Accounting Assistant Senior I.SO 1.00 1.00 - - - -
Office Assistant Senior 1.00 1.00 t.00 1.00 1.00 I.00 1.00 $3,318 $3,887
Office Assistant 1[ 1.00 1.00 - - - I.00 I.00 $2,989 $3,497
Project Assistant - - - 1.00 1.00 1.00 1.00 $3,684 $4,333
Civil Engineer [II 1.00 1.00 1.00 1.00 I.00 I.00 1.00 $6,026 $7,070
Civil Engineer [I 3.00 3.00 3.00 3.00 3.00 3.00 3.00 $5,699 $6,723
Civil Engineer [ 1.00 1.00 1.00 1.00 1.00 1.00 1.00 $5,097 $6,026
Engineering Technician Sr. 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $5,699 $6,723
EngineeringTechnician IV 5.50 5.00 5.00 5.00 6.00 6.00 6.00 $4,83U $5,699
Engineering Technician III 2.00 3.00 3.00 3.00 2.00 2.00 - $4,333 $5,097
EngineeringTechnician fi 2.00 2.00 2.00 1.00 1.00 1.00 1.00 $3,887 $4,578
Permit Technician - - - 1.00 1.00 1.00 I.00 $3,887 $4,578
Total Engineering 25.00 I5.00 24.00 24.00 24.00 2.i.00 23.00
Public Works & Utility Administration
Director of Public Works & Utilities 1.00 I.00 1.00 1.00 1.00 1.00 1.00 $9,057 $11,036
Project Manager 1.00 I.00 t.00 I.00 1.00 1.00 - $6,410 $7,810
PW&U Financial Mana�er 1.00 1.00 I.00 t.00 I.00 1.00 1.00 $6,101 $7,434
Administrative Analyst 1.00 1.00 I.00 1.00 I.00 I.00 I.00 $5,261 $6,410
Utility Accounts Supervisor I.00 1.00 I.00 I.00 1.00 I.00 1.00 $4,830 $5,699
Accountant - 1.00 I.00 1.00 t.00 1.00 1.00 $4,578 $5,392
AccountingAssistant Senior 7.00 5.00 4.00 4.00 3.00 3.00 3.00 $3,684 $4,333
AccountingAssistant [11 1.00 1.00 t.00 I.00 �I.00 1.00 I.00 $3,497 $4,105
AccountingAssistant 1[ 2.00 2.00 2.00 2.00 I.00 I.00 t.00 $3,318 $3,887
Customer Service Representative 1.00 1.00 I.00 t.00 2.00 �2.00 2.00 $3,146 53,684
Oftice Assistant Senior Spec. 1.00 I.00 I.00 1.00 1.00 1.00 I.00 $3,684 $4,333
Office Assistant Senior 2.00 1.00 1.00 1.00 I.00 1.00 I.00 $3,3 l8 $3,887
Office Assistant ll 2.00 l.00 2.00 2.00 2.00 I.00 I.00 $2,989 $3,497
Web Support Specialist - 1.00 I.00 I.00 1.00 I.00 1.00 $3,684 $4,333
TotalUtilityAdminislrrrtion ?1.00 /9.00 /9.00 /9.00 /8.00 /7.00 /6.00
15
Personnel
Monthiy Satary Ran�e
Function/Department 2004 2003 2006 2007 ?008 2009 2010 Low Hig►�
Utility Operetions
Water Resources
Water Reso�vces Manager 1.00 1.00 1.00 1.00 1.00 I.00 I.00 $6.735 $8,206
Water Operator Lead 1.00 I.00 1.00 1.00 1.00 1.00 1.00 $4,830 $5,699
Water Operator Senior 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $4,333 $5,097
Water Operator 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $3,887 $4,578
Water Resotaces Opecations Supervisor I.00 I.00 1.00 1.00 I.00 1.00 I.00 $5,392 $6,367
Water Reso�uces Assistant I.00 I.00 1.00 1.00 I.00 1.00 1.00 $3,497 $4,t05
Environmental Technician 2.00 2.00 2.00 2.�0 2.50 2.75 2.7� $4,830 $5,699
Tota! 6�ater Resources l 0.00 r n. no ! D.00 ! 0.50 / 0.50 / 0.75 ! 0. 7S
W aste rwate r
Wastewater Manaa�er I.00 1.00 1.00 1.00 1.00 1.00 (.00 56,735 $8,206
Wasteweter Treatment Plant Operations Supv. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 $5,392 $6,367
Wastewater Treatment Ptant Maint. Sipv. 1.00 1.00 1.00 I.00 I.00 1.00 1.00 $3,392 $6,367
Wastewater Treatment Plant Operator I 3.00 3.00 3.00 3.00 3.00 3.00 3.00 $4,578 55,392
Waste�ter Treatment Plant Operator li 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $4,830 $5,699
Wasteu�ter Treatment Plant Maint. Tech. 3.00 4.00 4.00 4.00 4.00 4.00 4.00 $4, l05 $4,830
WasteHater Treatment Plant Maint. Trainee• - - - - - - 1.00 $3,887 $4,578
Electronics Technician - - 1.00 L00 1.50 L00 L00 $4,830 $5,699
Joianey Electrician I.00 1.50 I.50 I.50 1.00 1.00 I.00 $4,830 $5,699
WWTP Laboratory Technician I.00 I.00 l.00 1.00 I.00 (.00 1.00 $4,333 $5,097
ComputerizedMaint. Mgmt. Sys. Tech. 1.00 1.00 t.00 1.00 1.00 t.00 1.00 $4,830 $�,699
Tota! Waslewaler 14.00 /5.50 16.50 /6.50 16.50 16.00 17.00
Stormwater& Facilities
Utility Operations Manger I.00 1.00 1.00 1.00 1.00 1.00 1.00 $6,735 $8,206
Water Distritxuion Supervisor 1.00 1.00 1.00 I.00 1.00 1.00 1.00 $5,392 $6,367
Utitities Service Specialist S1�pervisor t.00 1.00 1.00 1.00 - - -
Lead Utitities Service Specialist 3.00 3.00 3.00 3.00 4.00 3.00 3.00 $4,830 $�,699
Lead Water Distrilxuion Specialist 1.00 1.00 1.00 1.00 - - -
Utilities Service Specialist Senior 7.00 7.00 7.00 7.00 8.00 9.00 9.00 $4,333 $5,097
Utilities Service Specialist 9.00 9.00 10.00 I 1.00 I 1.00 1 I.00 I(.00 $3,887 $4,578
Utilities Meter Reader 1.00 1.00 - - - - -
SeHer/Storm Collection Supervisor - - - - 1.00 1.00 1.00 $5,392 $6,367
Cross Connection Control Specialist I.00 t.00 1.00 t.00 I.00 1.00 1.00 55.097 $6,026
Maintenance Coordinator I[ 2.00 (.00 (.00 - - - -
Maintenance Coordinator I 1.00 I.00 1.00 - - - -
Lead Facilities Service Specialist - - - 1.00 1.00 1.00 I.00 $4,830 $5,699
Facilities Service Specialist Senior - - - 1.00 1.00 1.00 I.00 $4,333 $�,097
Facilities Service Specialist - - - 2.00 2.00 2.00 2.00 $3,887 $4,578
Facilities/[nventory Supervi�r I.00 I.00 1.00 t.00 1.00 1.00 1.00 $�,392 $6,367
Tota! Stormwa�er & Facili�ies 29. �0 28. 00 18.00 3/.00 j2.00 32.00 32.00
* Position Terminates on 8/31/2010
16
Personnel
Monthly Salary Ran�e
F�mction/Deaartment 2004 2005 2006 2007 2008 2009 2010 Low High
Forestry
Forestry ManaBer I.00 1.00 I.00 1.00 I.00 I.00 1.00 $6,735 $8,206
Forestry Service Speciatist Supervisor I.00 I.00 1.00 I.00 I.00 I.00 1.00 $5,699 $6,723
Fore�ry Service Specialist Senior 2.00 2.00 2.00 2.00 2.00 2.00 2.00 $4 $4,830
Toto! Forestry a.00 �1.00 �1.00 �.00 a.00 d.00 1.00
Total Public Works & Utiliry Operetions 123.00 123.00 123.00 127.00 l27.00 125.75 119.75
Et�uipmeat Nlainteaance
Fieet Mana�er t.00 1.00 I.00 I.00 t.00 1.00 1.00 $5,807 $7,076 '
Accoiu►ting Assistant II 1.00 1.00 1.00 1.00 t.00 t.00 1.00 53,318 $3,887
Automotive Equipment Technician Supervisor - - I.00 1.00 1.00 1.00 55,392 $6,367
Lead Automotive Equip. Tech. 1.00 1.00 1.00 - - - -
Automotive Equipment Tech. 3.00 3.00 3.00 3.00 3.00 3.00 3.00 54,333 $5,097
A�omotive Technician Assistant - - - - 1.00 1.00 1.00 $3,318 $3,887
Tota! Equipment Maintenance 6.00 6.00 6.00 6.00 7.00 7.00 7.00
[nformation Technology
[nformation Systems Mana@er I.00 1.00 1.00 I.00 1.00 1.00 1.00 $6,735 58,206
NetHOrk Administrator I.00 1.00 1.00 I.00 I.00 I.00 1.00 $5,392 $6,367
Apptication Support Analyst - - - - 1.00 1.00 1.00 $4,830 55,699
Lead PC Technician - - - - I.00 1.00 1.00 $4,830 $5,699
Clntomer Service/PC Technician I.00 1.00 1.00 I.00 - - -
PCTechnician 2.00 2.00 2.00 2.00 1.00 1.00 1.00 $4,333 $5,097
Web Support Specialist - - - - - - - $3,684 $4,333
Tota! /nformation Techno%gy 5.00 5.00 5.00 5.00 5.00 5.00 5.00
Total Fmployees 332.00 356.25 360.50 370.00 371.98 370.68 356.13
FTE Per I,000 Population 9.38 10.30 10.04 10.33 10.09 10.12 9.73
City Population 37,520 34,580 35,910 35,8I0 36,860 36,620 36,620
Voluntary Reduced Kour Work Week or Fur[oughs - Submitted jor Consideratlon NTE Equivalent
General Fund
Financial Services -0.19
DepaRment of Communiry Development -1.03
Legal -0.09
Auditor -0.04
Parks -0.10
Public Works Administration -0.40
Water Resources � -0.10
Forestry -0.10
Engineering -0.30
Total V o(un�ary Rrduced Hours -
17
� � Nc�� 9, ?OO�)
'�LC�i��� �i�� Cu������ �:���� �
Bremerton Area (=ouncilman Cccil �IcConncll ��'��` --- ������� 9
----�---__.__.
Chamber of Commerce �'-ity� of I�rcmcrton
345 Sitith Street
Brcmertcm �Yt.� 9f�337
Dear Councilman i�fcConnell
'I'he 13remerton Area Chamber of Commerce encourages you to re-e�
the recommendations made b}• the I.odging '1'a� Advisory Committee to fund
risitor support for our communiry at $20,000.
Our request for 2010 �vas:
Function Amount
Staffing for Visitor Information Center $39,000
Visitor support (postage, phones, VIC xent, etc.) �12,538
Advertising 10 000
Total Request $61,538
Last year's cut resulted in reducing VIC hours, laying off our dedicated visitor
information staff inember and pulling Chamber staff from tasks that benefit
Helping businesses our local businesses so that staff could assist walk-ins and visitors calling and
emailing for information. Given the state of the economy, �ve believe it's vital
aehieve sueeess to increase visitor outreach and to provide more assistance to our struggling
since 1907 local businesses.
Bremerton hotels have benefited from having government contractors stay in
their establishments, however, the increased lodging tax funds in 2010 give us
a prime opportuniry to reach out to travelers who could fill our hotels on
�veekends.
We respectfully request your consideration to increase the amount allocated to
the Chamber so that we may rehire a dedicated Visitor Information Center
specialist enabling Chamber staff to assist our City's businesses. If additional
funds are available, we believe using those funds for marketing campaigns
�vould be a �vise investment.
Thank you for your consideration and �ve appreciate your commitment to our
community. Please feel free to contact me at silvia@bremertonchamber.org or
Bremerton Area `���-3579 if y-ou hare any yuestions or comments.
Chamber of Commerce
286 Fourth Street �incercly, __ _ _
,
Bremerton WA 98337 r . � � ��'��
��� -___.. ��
Phone: (360) 479-3579 � '
Fax: (360) 479-1033 Sil�'ia l�latman, IC)�1
www.BremertonChamber.org 1:tecudvc Dircctor
� Chamber's Fiscal Year Statistics
(October 1 - September 30)
Phone Calis 2008/2009 2007/2008
Visitor 134 151
Relocation �8 100
Plan Center 111 113
Armed Forces Festival 406 618
Hyas Tyee/Thunderbird 60 48
Installation 25 70
China/Ireland Trade Missions 76 98
Westsound Business Expo 85 (did not track separately)
Miscellaneous 2,766 2,148
Total 3,711 3,939
Emails 2008/2009 2007/2008
Visitor 72 112
Relocation 25 57
Plan Center 471 519
Armed Forces Festival 713 880
Hyas Tyee/Thunderbird 77 64
Installation 88 211
China/Ireland Trade Missions 132 202
Westsound Business Expo 183 34
Miscellaneous 8,905 8,524
Total 10,666 10,610
Phone Referrais 2008/2009 2007/2008
Lodging 36 41
Restaurants 14 84
Tourist Activities 58 37
Other 604 860
Total 712 1,022
Miscellaneous 2008/2009 2007/2008
Relocation Packets 106 162
Visitor Packets 1,045 1,270
Walk-ins 1,179 371
Web Site Visits 52,506 50,149
2008/2009 Assisted organizers of conferences/reunions/meetings for 899 people
2007/2008 Assisted organizers of ten conferences/reunions/meetings for 1,105 people