Loading...
HomeMy WebLinkAbout5094 ORDINANCE NO. 50 q �' AN ORDINANCE of the City Council of the City of Bremerton, Washington, amending the Comprehensive Plan, as follows: Amend the Land Use Map to reflect cartographic updates; update the City Services Element and Appendix integrating applicable plans previously adopted and the 2010-2015 Capital Improvement Program; update the Transportation Element and Appendix to reference the Non-Motorized Transportation Plan and inclusion of the 2010-2015 Transportation Improvement Program; amend the City Services Element and Appendix to adopt the new 2008 Stormwater Management Plan Update; amend Transportation Element to adopt the Commute Trip Reduction Program and; change land use designations for a portion of the Kitsap Lake Reserve Center from Neighborhood Business to Limited Commercial. WHEREAS, the City of Bremerton adopted a Comprehensive Plan on December 1, 2004 by Ordinance No. 4917 and has been subsequently amended by Ordinances No.; 4954, � 4962, 4985, 4998, 5025, 5034, 5037, 5062, 5077, and 5082 hereinafter referred to as the "Comprehensive Plan"; and WHEREAS, the Washington State Growth Management Act ("GMA") requires internal consistency among comprehensive plan elements and applicable regional plans; and WHEREAS, to assure that comprehensive plans remain relevant and up to date, the GMA requires each jurisdiction to establish procedures whereby amendments to the plan are considered by the City Council (RCW 36.70A.130(2)), and limits these amendments to once each year unless an emergency exists; and WHEREAS, the City of Bremerton has established a procedure for amending the Comprehensive Plan in Title 20.10.010 of the Bremerton Municipal Code (BMC), that limits amendments to the Comprehensive Plan to no more than once each year; and WHEREAS, consistent with RCW 36.70A.106 the 60-day notice period began on September 1, 2009 when the Washington State Department of Community, Trade, and Economic Development received notification of the Comprehensive Plan Amendment docket for 2009; and r WHEREAS, no public comprehensive plan amendment applications were submitted in the 2009 Comprehensive Plan amendment docket and all amendments are initiated by staff to address changing circumstances relative to land use needs and the need to create consistency between all city planning documents and the Comprehensive Plan; and � WHEREAS, on September 5, 2009 the public was notified by a legal advertisement in the Kitsap Sun of the opportunity to make comment and participate in the public hearing by the Planning Commission; and 1 2009 Comp Plan Amendment WHEREAS, on August 31, 2009 a SEPA DNS was issued for amendment docket with an administrative appeal deadline of September 14, 2009 and no appeals were filed; and WHEREAS, on September 15, 2009 the Planning Commission conducted a public hearing on the 2009 Comprehensive Plan Amendment Docket, and the Planning Commission recommended the City Council approve the amendments with a minor modification; and WHEREAS, on October 24, 2009 the public was notified by a legal advertisement in the Kitsap Sun of the opportunity to make comment and participate in the public hearing by the City Council; and WHEREAS, on November 4, 2009 the City Council conducted a public hearing and considered all testimony prior to their decision; and WHEREAS, the proposal meets requirements of the Washington State Growth Management Act (GMA); and WHEREAS, the proposal is consistent with Kitsap County Countywide Planning Policies (KCCPP). NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. The findings and conclusions adopted by the Planning Commission on September 15, 2009 and attached hereto as Exhibit A are adopted and incorporated as if set forth fully herein. SECTION 2. The City of Bremerton Comprehensive Plan is hereby amended by approving and adopting docket items 1-6 as follows: Docket Items: 1. Land Use Map: Amend the Land Use Map (Pg. LU-46) to show cartographic updates, and correct City boundaries, more particularly described in Exhibit B affixed hereto. 2. Citv Services Element & Appendix: Update to the City Services Element and Appendix to reflect previously adopted plans from Parks, Water, and Wastewater and their Capital Improvement Programs, more particularly described in Exhibits C.1 & C.2 affixed hereto. 3. Transaortation Element & Appendix: Amend the Transportation Element, with the addition of text referencing the previously adopted 2007 Non-Motorized Transportation Plan, and the addition of the 2010-2015 Capital Improvement Program into the Transportation Appendix, more particularly described in Exhibits D.1 & D.2 affixed hereto. 2 2009 Comp Plan Amendment 4. Inclusion of the Stormwater Management Plan Update: Amend the City Services Element with text updates, reflecting new data and information and adoption of the 2008 Stormwater Management Program Update and the addition of the 2010-2015 Capital Improvement program, more particularly described in Exhibits E.1 & E.2 affixed hereto. 5. Inclusion of the Commute Trip Reduction Pro�ram: Amend the Transportation Element with text updates adopting the Commute Trip Reduction Program, more particularly described in Exhibit F affixed hereto. 6. Change in Land use Designation: Amend designations in the Kitsap Lake Reserve Center from Neighborhood Business (NB) to Limited Commercial (LC) for parcels north of Kitsap Way, more particularly described in Exhibit G affixed hereto. SECTION 3. Severabilitv. If any provision of this ordinance is held invalid or unconstitutional, such invalidity or unconstitutionality shall not affect the validity or constitutionality of the remainder of this ordinance. Provided however, that if any provision of this ordinance is held invalid or unconstitutional, then the provision in effect prior to the effective date of this ordinance shall be in full force and effect for that individual provision as if this ordinance had never been adopted. SECTION 4. Effective Date. This Ordinance shall take effect and be in force ten (10) days from and after its passage, approval, and publication as provided by law. � PASSED by the City Council the day of ' , 2009 � `� ���� CECIL McCO ELL, Council President cr, Approved this � day of ` , 2009 ��f;�it.� C CECIL McCONNELL, Mayor Pro tem 3 2009 Comp Plan Amendment ATTEST: APPROVED AS TO FORM: ��G CAROL ET N, ity Cle RO R A. LUBOVICH�t�a PUBLISHED the � day of .� , 2009 EFFECTIVE the day of , 2009 ORDINANCE NO. �jQ J'� 4 2009 Comp Plan Amendment � Exhibit A FINDINGS AND CONCLUSIONS � OF THE CITY OF BREMERTON PLANNING COMMISSION 2009 Annual Comprehensive Plan Amendment Docket i. FINDINGS OF FACT 1. Project Description . . The City considers Comprehensive Plan amendmenfs annually. The intent � of this year's amendment process is to only make minor changes and corrections to the Comprehensive Plan. The six changes on the dacket are: Adoption of Official Land Use Map for minor cartographic updates; update City Services Element and Appendix and adopt Capital Impravement Program; update the Transportation Element and Appendix and adapt Transportation Improvement Program; amend City S�rvice Element and Appendix to adapt the 2008 , Stormwater Management Plan Update; amend the Transportation Element to adopt the Commute Trip Reduction Program; official land use rnap amendment regarding a change in land use designation from Neighborhood Business ta Limited Commercial in the Kitsap Lake Rese►ve �enter. 2. Procedura! History 2.1 On August 31, 2q09 staff noti�ed the Department of Cammunity, Trade and Economic Development of the intent to adopt amendments ta the Comprehensive Plan. 2.2 On August 31, 2009 Staff published the SEPA Determination of Non- significance in the Kitsap Sun. 2.3 On September 1, 2009 the Draft Amendment Docket was available for public review on the City of Bremerton's website. 2.4 On September 5, 2009 a notice of P(anning Commissian public hearing was pubEished in the Kitsap Sun and the public was invited to camment. 2.5 On September 15, 2009 Planning Commission canducted a public hearing on the 2009 Comprehensive Plan docket. 3. Pubtic Comment 3.1 Individuals submitting writtan comments: a. Mark & Patty Nesby, 1295 Lakehurst Dr, Bremerton WA 9$312 b. Chuck & Patty Bair, Kitsap Lake Storage {360) 373-640a c. Gruss Inc, 6724 Kitsap Way, Bremerton WA d. Symington, 3233 Chico Way NW, Bremertan WA 98312 � 3.2 lndividuals providing verbal testimony at PEannirtg Commission public hearing: �. �i�1u�. f�112- , Cvyc>n k�k�aP waT� Brenn-er WA�- b. _�1_i��k Ne,sby , to�?.o t�t�-sq� wy , 8�e�-e�r�on �n�a- c. �C t� r, ��C�P 1`� b� �t k� P�t� W y R�f�ern-er {-o,a w I� d. T�er✓�� L.UAa{ 1�10 k�l-�rn� W�( ,�r�ev��er �, WA- e. f. Exhibit A 4. SEPA Determination A Determination of Non Significance (DNS) was issued on August 31, 2009 with an appeal deadline of September 14, 2009. 5. Consistency Amendments to the Comprehensive Plan shall meet the decision criteria outlined in BMC 20.10. The Planning Commission may recommencl, and the City Council may adopt or adapt with modifications, an amendment to the comprehensive plan if the criteria outlined below are met. , 5.�1 BMC 20.10,080(a} allows amendments to the Comprehensive Plan if there is an obvious technical error in the pertinent comprehensive pfan provisions. Amendment 1(Map cartographic updafesJ: The adoption of the updated Comprehensive Land Use Map falls into this category due to cartographic errors. Cartographic misrepresenfafions were identified and corrected. 5.2 BMC 20.18.020 (d) (1) allows amendments to the Comprehensive Plan if it is consistent with the goals and policies of the Comprehensive Plan. These amendments (2-6) are minor and confinue to uphoJd the objectrves and goals of Comprehensive Plan. These amendments do naf change the intent or purpose of the Comprehensive Plan. Amendment 2(Update to City Services Element and Appendix); Multiple City departments have worked colfectivefy with the Department af Community Develapment to integrate their respective plans into the Comprehensive Plan, providing mare consistency and transparency within the City's planning dvcuments. This amendment integrates previousEy adopted City Service plans and their 201 Q-2015 Capital fmprovement Program into the City Services Element and Appendix. This arrtendment is consistent with many policies of the Comprehensive Plan, reproduced here are a selection of these policies: LU3 — Create an environment that will promote growth. LU71— Provide for the viabrlrfy of communities, neighborhoads, and Cenfers through strategic land use designations and infrastructure provisions. LU19c — When developing and locating new infrastruc�ure and capita! investments, ensure efficienf use of community resources. LU99g — Ensure comprehensive and conveni�nt servrces for each community within the City. Amendment 3(Update to Transportafion Element and Appendix}: The City's Engineering Division completed the Nan-Motorized Transportation Plan and integrated it into the Comprehensive Plan during the 2007 Comprehensive P1an Amendments. Exhibit A This amendment addresses the need to add text into the Transportation Element referencing the Non-Motorized Transportation Plan, and adopt the updatect 2010- 2015 Transportation fmprovement Program into th� Transportation Appendix. This amendment is cansistent with many policies of the Comprehensive Plan, reproduced f�ere are a selection of these policies: CC2f — Create and improve urban open spaces. CC3 — Provide far a safe, pleasant, and rich pedestrian experience. � LU3 — Create an environment fhat will promote growth. LU1Q — Provide lncentiv�s and flexibility fhat encourages and enable development in Centers. LU91c — When developing and locating new infrastructure and caprtal investmenfs, ensure efficient use of community resaurces. LUT 1g — E'nsure comprehensive and convenient services for each community within the City. Amendment 4(City Services Element and Appendix): This amendment addresses the need to incorporate the updated Stormwater Management Plan into the Comprehensive Plan for consistency between the City's planning documents. Text updates are incorporated into the City Services Appendix along with the 2010-2015 Capital Improvement Program. The City adapted its Stormwater Managemen# Plan, an element of the Camprehensive Plan, in 1996. Plan amendments are processed as conditions warrant. This Update is due to changes in Federal and State laws, most notably the National Pollutant Discharge Elimination System (NPDES} Phase II Permit and the Puget Sound Partnership's (PSP} agenda for cleaning the waters of the Puget Sound. Stormwater management is regufated by BMC 15.04. The scope of the 2008 update responds to the requirements of the NPDES Phase If Permit, as well as the introduction of Low Impact Development (LID) strategies in dealing with starmwater control. This amendment is consistent with many policies of the Comprehensive Plan, reproduced here are a selection of these policies: � LU3 — Create an environment that will promofe growth. LU10 — Provide lncentives and flexibility fhat encourages and enable development rn Centers. LU��c — When developing and locating new infrastructure and capital rnvestments, ensure eff+cient use of communify resources. LU11g — Ensure comprehensive and convenient services for each community within the City. LU15b — Protecf aquifer recharge areas, especially those used to provide public wafer supplies (GMA Requirement). LU15c — Coordinafe measures fo protect groundwater resources wifh watershed plans and planning efforts (GMA Requirement). E1— Ensure the lang-term healfh of Bremerton, promote sustainable growth and actrvities. � Exhibit A E9c — Use, where feasible, new technologies that demonstrate ways fo reduce environmental impacts. E3 — Reduce and prevent environmentai pollution of air, water, Irght, noise, and soil. E3e - Education citizens about sources of pol(ufion. E10 - Encourage environmentally responsible developmenf. Amendment 5 (Transportation Element): This arr�endment addresses the need to incarporate the updated Commute Trip Reduction Plan into the Comprehensive Plan for consistency and transparency between the City's planning documents. Text updates are incorporated into the Transportation Element. In 2006, the Washington State Legisfature passed the Commute Trip Reduction E�ciency Act which amended the requirements for local governments in those counties experiencing the greatest automobile-related air pollution and traf#ic congestion to develop and implement p(ans to reduce single-occupant vehicle trips. The Commute Trip Reduction Plan has been prepared in accordance with these revisions to RCW 70.94.521. The Commute Trip Reduction Plan is a collection of City-adopted goals and policies, facility and service improvements and marketing strategies about how the City will help make progress for reducing drive alone trips and vehicle miles traveled over the next four years. Building upon #he success of the existing commute trip reduction program, the City strives to meet the goals of the plan for the future by working in partnership and coordination with other agencies and employers. This Commute Trip Reduction Plan helps to support the achievement of the City's vision and the goals of its comprehensive plan. This amendment is consistent with many policies of the Comprehensive Plan, reproduced here are a selection of these policies: E1c — Use, where feasible, new fechnologies that demonsfrate ways to reduce environmental impacts. E3 — Reduce and prevent environmental pollution of air, water, Irght, noise, and soil. E3e — Education citizerrs about sources of pollution. E10 — Encaurage environmenta!!y responsible development. T1— Encourage the development of an integrafed mulfr-moda! transportation system, that provides a variety of convenient transportaf�on choices to rmprove fhe movement of people, goods, and freight. T3 — Develop and maintain a fransportation system that respects the natural environment, including the quality of Bremerton air, wafers, and natural habitats T7 — Develop travel management strategies to minimize the need for addifional transportation infrastructure and expenditure. T7a — Continue to coordinate with loca! employers to implement commute trip reduction plans and programs. Amendment 6(Parcel land use change from A!B to LC): Staff proposes a land use re-designation for the parcels north of Kitsap way from Neighborhood Business to Limited Commercial. Prior to the 2004 Exhibit A Comprehensive Pfan update fand use designation of this area was Generaf Business which is equivalent to the new designation of Limited Commercial. The intent of the Limited Commercial designation is to recognize the community's existing general commercial districts outside the designated boundaries af centers on lots zoned general business in the City. Staff praposes to reconcile the zoning in this area to the previous designation of Limited Commercial. This amendment is consistent with many policies of the Comprehensive Pfan, reproduced here are a selection of these poticies: � LU9b — Identifying and integrating edge areas in the planning of neighborhoods. LU3 — Create an environment thaf wi!! promote growth. LU3a — Modifies existing zoning ta provide for essential servic�s. LU1 �— Provides for fhe vrability of communifies, neighborhoods, and Centers through strategic land use designations and infrastructure plannrng. 5.3 BMC 20.18.020 altows amendments to the Comprehensive Plan if it does not conflict with other City, state and federal codes, regulations and ordinances, Analysis: The amendments listed in the 2009 Comprehensive Plan amendments do not conflict with any other regu�ations. 11. CONCLUSfONS AND RECOMMENDATION Based on the findings above, Planning Commission concludes that the 2009 Comprehensive Plan Amendment Docket has met the criteria for amendments to the plan as detailed in BMC 20.10.080 and therefore recommends adoption by �he City Council. Resp4ctfuily submit#ed by: � . ' � �� ./ ' G' ' �xecutive retary ', /f � ��/ Approved by: /� v�,� Greg eeler, Chair !1 Exhibit B � � Cit of Bremerton Official Land Use Ma Y p _ _____ .-m �: r � � . � , � " � � , t � �. R < < . �} ,. Legend � � � � � - - j� r , �. �� o � � , � � �a � � I � ' � � �i`� � � r � � 7U � i I � O `� � I t r' � � :� _ �� {1 �, ''_ � '� ai� * � _ �, } �i���OityLimits s. = � LimiletlCommeroial _ ��� � d , � _.�'� � r � �- ���� u�1C".�� I�LJ�4�S << �k m �� ... i _ � r. ..,�.. ... , '� Future Reserve Center Neighborhood Business I '� V � �- r �, � � ; F. � � � AdopledSubAreaPlan - FreewayCorridor � �Q� •� , �=�� ��� � �a -UGA -�- W � � P - ' , � Tax Paroe�s � Industnal ; f �,f� �� �� D R'�►► FT � � � � � t � �'" b�USON �� � � = r - Regional Center Industnal Park ;, 111 �� � � - {T� �' :��- � . - , J � ' y �i �T } � � L I ��� ,.. ;- DisMCt Center � Marine Industrial - � F 3 �� � � � I' "�" i, ��I; _�� a�t �> ,. I TRACY A�i � i ; - Manufacturing/Intluslrial Center - Higher Educa4on II � � ('k� fi� o.�e.r f F' ��� - �--.-�..._� , I i . ; f `: I , � � � �"'� Neighborhood Center Open Space � � + ��� � p'�,r� 1 � � ° � ___ � . ��� � _ ^ /` -:� � �� , � - Employment Cenler Pu9et Sound Naval ShipyarC �� lmdi r ,}�, �� a z„��{� � �\ ¢ y `� r `` ._ �.... �s � "t74 `�T y 1 � �n �N � / A ' Q � � � .. . � . Low Density Resitlential �. Pudic Sector Redevelopment Site ` ' � � ��t LL1 , � - C�.i -.� : ;t, �:. S ` � IVY D W f f � � -__._. 7' y x° ,. . z� a .c�� Ciry Core Residential - Walershed u� r� �� I. � E -� ! f ' '���� f a .- J " ? � � i �`t , *, i - Canmercial Corridor City UUliry Lantls �p �, r'r� ����` ' ` � p� � F *'"' ' ° a ""^ � � . � 1 � �� � Y , _ � Wheaton Way Redevelopment Cwridor - Transportatbn, Utilities, and PuWic Faci�iUes r I ; . ��� I / �� 1 , _. � � � _ � � } _ �^ � � �} � � �' � � , " � O .� ir�� ir � �.� � �,_`. � a ! Y:� . � ���rl , ; �-� ,;, zoo+c�na�a��wna,ca�wanq,��eam��-o � �'"�*� , 6 J ' O • Y � \ � S1'�ERI q ^ �ic � caw� n� � d n�,ti��,a,��u- zoa ow�,� wsa. zoo� - w3�. zooe � o�a,.� wsz. sm aa. rw � J � r' _ -- ' p CJ . 1 � f f�- ( � i � • m wu ae �orea w� ue�� �w �� awwro w�co�s rre �.� a wo v���.�.aw.��o �a�worn a � � 1- i 1 t � � N . � � �,, 2 H � . '` �� � m�e o�ro �e vo�wr ro� wie� a•waec ;. • �,. � .. �.�. �: � y ,� <F � - I , ° � _ �� Fw�rt'CwmmumYOOwWmwn�nm.n�ivDawr+M�+mrY3NrnvaVNwwE_4ruru�eiBmm�an.GY4rtlUwLLUTeW`Gm0�Da09.m�a � �� I �` O ! �}j',..... O,n.:nmV Z � � �VC��� ' f f ,. Miles ` . . . / '' 0 03 O6 12 1.8 2.a I � ��,� �� � f'. ` o m ' � ._-__.' . .....' � � ';. __ ,r��_ � ,1.�`,_J . . � Poit ryas � 1 — � � ..� . F � , � � � �� � � ; ' � ° 79TH S� , � � � i I �- j � � , H ST -- I + _ I � _ � / ; r- � � � O �. � I 15T � �� � r ! - -�- � - � � � a�.,o�y,. J � �� tk.t� f ' I ��� I � {- � � {- t ���� �/� p �, k a ' � " '��, 71TH ST E ��TF4 �T I � � �,�++;�N' � � � !� i� � � �!� �c,;i fz �IL 6TH ST-��w � TH S ' � s �r� a III� � _ �� �� • ��....w � i ' '' �_ �; >�� z � �' � sr : � __ . i ! �'� ° = sF�A ' i � � , ¢ - . �ER R � ' � � � �. ��'y � E ST � �EN Sr, � ( � i ,, , / _ � ,, � � � � , �.._._..�. i... . , , r-,; , � i �- � � � � � , �- --- • awl'#�������■ ,' �_ � ¢ �p.G i P � � '���? � �% �0� j ": /, QQ , � ' � � . � r�' . .� ' ` � aa r� � y� 4 a ` \ � �. � Q � , � , o �` _ r,. 7 Q � Q � I I�F�� � '� �� - .\ ` _. _ �, _� � /" _`; � �'� �• 1 G� /a. �� `• � � �� ' �� � . �� � m � Cit of Por Orchar , _ I �_ ,.� ,�.� � ti , �. , � �` �� �,�€�r � ,_ :_-=_� � r �� �' . � � a� . a �/ y ,� � , i .� L--„ �� ' - 1`'�� * ° 2 � � ' 1M „ _ �•� � �-� SOUTH ST P �LLS R� � "{ •" O ��LFAIR VALLEY RD i t ��� �'x.,-� � I Q a- :Fu��� . > ; " . � �� . � '' � ' ��� ���'���� _ �� � r i � � ,'� � `' � w, � � � , , � .... „�.<�� _ : Q ,O - � ! _ ����/A ti���� � � � , � , > � ' G�"!a ' �,�, u_ . ■ . -� _:,�,y9V , � � Z : �..� � _ _ _ = ��i � f a . � i _� y�� �' Z � ��� `; ' a (' �. �' � � � ; � , i �._",: L�._ �r Ng � ,;,�.� ¢ �'ort Orchard UGA � �. �k , � � � �-� �}'.i � � � � � � ��, ..' #.� � ` 3 . . , � �� . .� r ,, � , : ' � i fi T } , , z� F �, ,�. , i t � I SALMONBERRY RD .. `• , � � �!� �_ a � � �� BERR�LAKE �iq j� p � � � -� � � � � �• 9� „�p� r f�! ' �Q. � -_--� ,. y, ,� u ,.� _ � ; �_ ,, � � � � � U r , r t� � ;�, i � �+ � _ � � � � > > c� � � �� �` � � � . ., _ &F�DC�WICK'R � ,----° � � �� - �� � ��` ��P FD ����� i � " � � ' �'l is , I �HARP 1 , �. � ' ' � � � t 1 I i � . �` Q _- � -� � -- �_ ' ����� j1 � � � , ^_ .., '. ; , � ; , , _- � 1. � � -;.� �''_! � i o z z � �. . �----�-., � � °� � ,� � ..i �,,�;� � .�� �_ � � ` � , �,� ° ' �� �° . � � � � _� ,, �; r ` � � .: o� ��,� ' ,1���� ' � } � ��. � � 4 ' �� � � � , � � ' � � ' , '.. ��� '� ... � '�� ,' I I �_ � � � X �`� F 1�.. � , � � � Q � � � If � ;, . � �- �� �� ' � � � n � � � � � � 1 � + � ��` I � : � �. � ` i � C �+ �6lJiaE� Ro� � .��� �, �¶ r � . r �� � _. � � . � �� � � � � ( _. � z � Y��� r , � �� , ,- `. � ° ' '� : �� i x �; � ���; � ,- �� y��� � � �� � �� � � � � , �+ � � . ,_.� , ,.. — - -� �,� ... i f r it � '� ���'�I �,�._ t ,, . , ',• � I1 }� • L__.� � , � � r--. � -{� �i , � �.— �� _ � � ,1 � .r � .�. ,� � - . �: � �.� .' �' ' Z � -- : �� f r .. / ! .. .., ,i ��� �� �'t�-' . . i ' Q� '� 1 1 �.. L 1 1.- I I' �� I r �� t,� I y7 I� j •,;� �?,�` I � t a_ _ 1 _ _- # ' �" 1 :� ;'.�� �1SI � ' , A � �� ,,- ���j"� . • � 1 ��, I x { � {. 1 � � _ � � � 1 r � I .,.� ' ��_, i � � � . �V � �� Y t l� � T � z � - � ' I �. } _'=�- j - 1 � , � - � � - �., �! , ' � � { � � '�L! _4_ � __ [ _ c� ` l+,; �r� !;� ) .h � ,i�.�'� �,t ��:. _�._< <' �, �,'�,��� �� ��` � p �� ����� � � � L1 ' � ��� -�' '-, -. , _ � 1 N . v i � ' �_ � .� �� �_ �-�� � �_ 1 � � �/ � 1 .�;. � 1 _ — ��� . ° �I_� � , 1� �f �� I� � z !f '� � . -- ��� ��{` _ i- \ i � � � - � � O�R s i < '...`�� k__ ::\� i....,t � +� ��_-- ���,---� � 6� .. ���� f F � ' � r A 4 ' O! >� �' i !, � �^4t,AfCE�L . �% .- � / - � -�- � � ..� ! i � r �r�� - - �, � f- � � I s }�:� ' � � i I ��� ,�_� '� r l___ . -,- �� � i���� 1--� �� �l i' Q ! ��� t � W� I�I I+ �r� �, ��� '� �. � � � '� _ ; � r . � I �` -- ' ' -- • _ � � � � � � � �,'�€�;, ,_ � ,.� ��� � �� �x��il� � .F� '`: I� T � ! , ; �. ,, � , � . , , , . _ , r . ;_ . , ' ' ' , ; oa � ' � f� ; �� , , =: : ��� , '� �� - : ,� _ " � w ,�i^ � ��� �� ,. _ ; � ., � j % r', J � �, : ' � . , , , � l_ , . . I ___, .. ��' � � � � i . . � W I ;._.... _. , , b m . W m , W ,..:. � ; �'', ; , : ` ��V�� ; ' ' � MISTY LN'4 . ; � � ��� � T � ¢ � 4�, ; ' a ' ' ! , � , � ., , ' � � � ::-� �' . Z = �,1 ' Q � ' (x9 � ', p " �� f A ai' - � : � ¢ � r�• kVJ1�Y1lQ p _}V . E � £' .., ,'- ; _ a� , � �� � . .- �� � ..� .-� �.- � l i t. � q L4 � � �- . i � f � ,;_ ` '.' 7 � {��" � : � . 1 � ;- , . : , � . , � -- � . � � . . .:, , ; , _.,. � . � . , . . . , - . , Exhibit C.1 LOS Standards The level of service expected by the community for each type of public service discussed in this section, is identified within the section devoted to that service (see City Service Appendix). For ease of reference, however, those Level of Service Standards are summarized in the table below. In the long term, approximately 20 years, Bremerton intends to achieve the level of service standards set forth in the following table. (Table CF-1) Table CF-i. Ca ital Facilit Level o Service Standards - Lon Term Capital Facility Type Level of Service Standard (LOS) Date est. Emergency Medical Services 4.0 minute response time for BLS 8.0 minute response time for ALS 1995 Fire 5.0 minute response time 1995 Law Enforcement 250 sq.ft. per officer 2003 1.8 officers per 1,000 pop. 2003 �a~�-s bec� . , . �ar1ES--�eg�er�a� . , . - �a�s--9�ex-�ee �.�� ae�es-ge� �,988�e�se�s �9���-ac-�es-���ta �°O>� Neighborhood & Community Parks 5.5 Acres of Developed park land per 1,000 residents 2007 Sanitary Sewer 100 gallons per caprta per day (gpcd) �8A3 2005 Storm Water Management A�a��Ea���+e� �#�g-�e��k�-��e���va�e� s�a��ar�s �� Maintain per Stormwater Management Manual for 2009 Western Washington Schools - Elementary (K-5th) �Ta * 90 sq.ft. per student -.013 acres per student 2009 Schools - Middle (6th-8th) nra * 117 sq.ft. per student -.017 acres per student 2009 Schools - High (9th-12th) n¢a * 130 sq.ft. per student -.018 acres per Student 2009 Streets, transportation - Vaned. See Transportation Element 2003 Water 200 gal/day �99-3 City of Bremerton Comprehensive Plan CS 21 City Services Element Exhibit C.1 Capital Facility Type Level of Service Standard (LOS) Date est. 2005 � 1.... ...a..4n� ...Fti. 41.i. �nli. r...i..�....i.� �.F 4H� F:vn} i. i..�!-.....Le. L.. .. r.a .,., .f�-�.u..� . Use of varied LOS Standards to support community goals The establishment of Level of Service Standards that support the desired land use pattern - and the related effect of concurrency requirements - can provide a very strong incentive, encouraging future development to occur in the places, and be of the type, envisioned by the community. By making a conscious decision to accept more congestion in District Centers, for example, a community can reduce the difficulty that a prospective project faces in meeting concurrency requirements in that location. The reduced project costs and streamlined permitting that results can be a strong incentive in attracting development to that desired Center location. An incentive-based use of Level of Service Standards for streets is discussed in detail in the Transportation Element. It is important to establish here that this incentive approach will be considered and implemented for other types of capital facilities, as well, in the future. This approach may be appropriate for parks, for example. Decisions about appropriate uses of variable LOS Standards as development incentives will be made as parks plans, water plans, and other service plans are updated and/or developed by the City. Citu of Bremerton Comprehensive Plan CS 22 City Services Element Exhibit C.2 Table CFP-1 T es and Providers of Ca ital Facdities Faalit T e Provider Descn tion A licable Plan s Fire and City of Provides facilities that support the Emergency Bremerton provision of fire and emergency services. Services F�re Dept. Law City of Provides facdities that support the Enforcement Bremerton provision of law enforcement services Police Dept Parks City of Provides facilities for passive and active • Land Use Element Bremerton recreational activities • Parks & Recreation • 2007 Parks, Recreation Dept. & Open Space Plan Streets City of Provides streets, sidewalks, traffic • Transportation Element Bremerton controls, and street lighting. • Six-Year Transportation Dept. of Public Improvement Program Works & (TIP) Uttlities Sanitary Sewer Bremerton P�ovides facilities used m coflection, • Utilities Element Municipal transmission, storage, treatment or . n..,�« , oo� ���..�+�,.,.,+,,. Wastewater discharge of waterborne waste within most Utdity developed portions of city and some • 2005 Wastewater surrounding unincorporated areas. Comprehensive Plan U date Schools Bremerton Provides elementary and secondary • Bremerton School School District facilities for instruction in the several District Capital Faalities branches of learning and study required by Plan: In Support of the the Basic Education Code of the State of School Impact Fee Washington Program, July 1992 • Mappmg the Bremerton School's Future 2006/2007 Storm Water Bremerton Provides facdities that collect and transport • Ord. 4454 Management Municipal stormwater runoff. • 2008 Stormwater Stormwater Management Plan Utdity Update Water Bremerton Provides supply of potable water from • 2005 Water System Municipal system of surface water and welis. Comprehensive Plan Water Utility Service area includes developed portions of city and surrounding urnncorporated areas. Utdity also contracts to provide water to additional areas (Tracyton, Rocky Pomt, PSNS, and Port of Bremerton airport and industrial park Citii of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 3 Exhibit C.2 Parks Bremertori s park system contains 319 acres distributed over 32 park sites. Types of parks range from pocket parks which may consist of a fraction of an acre to regional parks such as Pendergast with 50 acres. For the purpose of park and open space planning the 360 acre Gold Mountain Golf Complex is not included in the park inventory. The city park system is managed by the Department of Parks and Recreation with citizen input formalized through the Bremerton Parks and Recreation Commission. The Parks Capital Improvement Program (CIP) consists of a series of acquisition, development and renovation projects identified during the extensive public process held to develop the Parks, Recreation and Open Space Plan adopted in December of 2007. • I , , . ,,,��.... ,. „},. ,.c .,ii i.,...,a . ,;,.i.:� �t.,, : .,�,,,a ,.:}., t:...,:,... 1.��.. �y���.�� ��� ��«. . =�'��s�a��s ea���a� €ae�}���es-�eg��� ��a��s �t�e�t seee���-������tg-e#�e�s. '�ke�Ug�� � :..� Inventory of Park Lands There are eight park, recreation and greenspace facilities types used by the City of Bremerton: • Pocket parks • Neighborhood parks • Community parks • Regional parks • Greenspaces • Natural areas • Trails • Special facilities Pocket Parks Pocket parks (or Mini parks) are generally smaller than one-half acre in size and may provide a specific, local need such as a neighborhood tot lot, viewpoint or urban plaza; however, they are Citu of Bremerton Comprehensive Plan - City Service Appendix CS Appendix -17 Exhibit C.2 not an adequate substitute for a neighborhood park. These open spaces typically provide a more passive user experience and can include elements such as picnic and sitting areas. Due to their small size, pocket parks are not intended to serve or provide site amenities that would draw from a wider community area. These parks are intended to serve their immediate residential area, generally within �/a-mile of the site. Pocket parks may be considered as a surrogate neighborhood park only when providing a larger, traditional neighborhood is impractical or unachievable. Parking is generally not recommended or necessary. POCKET PARKS Arvon Park 0 02 East 9th St. Mini Park 0.03 Lower Roto �sta Park 0.5 McKenzie Basketball Court 0.02 Pat Carey �sta 0.5 Roto �sta Park 0 7 Whitey Oomstad 0 2 Wycoff Memorial Park 0.02 SUBTOTAL 1.99 Neighborhood Parks Neighborhood parks are generally no more than 10 acres in size, depending on a variety of factors including need, location and opportunity, and should meet a minimum size of 1.5 acres in size when possible. These parks are intended to serve residential areas within walking distance (up to ih-mile radius) of the park site and should be geographically distributed throughout the community. Access is mostly pedestrian, and park sites should be located so that persons living within the service area will not have to cross a major arterial street to get to the site. Developed neighborhood parks typically include amenities such as pedestrian paths and trails, picnic tables, play equipment, play fields, sports courts, landscaping and irrigation. While no service standard previously existed for neighborhood parks, this Plan proposes a combined acreage standard for developed neighborhood and community parks to emphasize their importance within Bremerton's system. The proposed standard is 5.5 acres per 1,000 residents. Citu of Bremerton Comprehensive Plan City Service Appendix CS Appendix -18 Exhibit C.2 NEIGHBORHOOD PAIZKS Bachmann Park 0.5 Bataan Park 1.0 Biueberry Park 6.9 Forest Ridge Park 27.3 Haddon Park 3.7 Kiwanis Park 4.0 Lent Landing Park 1.5 Manette Pla�eld 2.6 + Matan Park � 37 � Smrth Pla�eld 2.4 � WaRen Ave. Playfield 3.0 SUBTOTAL 53.3 Community Parks Community parks are generally 10 to 50 acres in size and are best defined by the array of recreational activities that a site provides. Community parks may include areas suited for intense recreational facilities, such as athletic complexes and skate parks, along with passive areas for walking, wildlife observation and picnicking. These parks serve groups of neighborhoods within a 1-mile radius of the park site. Access to community parks may be by car, bicycle or on foot. In general, community park facilities are designed for organized activities and sports, although passive components such as trails and picnic areas are highly recommended as complements to active sports facilities. The range of facilities provided will be greater than in neighborhood parks and will generally appeal to more diverse user groups. Developed community parks typically include amenities such as picnic shelters and tables, tennis courts, covered activity areas, soccer and baseball fields, bike and pedestrian trails, restrooms, landscaping, irrigation and parking lots. Community parks may also incorporate community facilities, such as community centers, senior centers or aquatic facilities. CitU of Bremerton Comprehensive Plan City Service Appendix CS Appendix -19 Exhibit C.2 COMMUNITY PARKS East Park 17.5 Evergreen Park 10.0 Kitsap Lake Park 2 0 Lions Park 15.0 N.A.O. Marine Park 27.5 N.A D. Park 54.0 Shendan Park 3.0 SUBTOTAL 129.0 Regional Parks Regional parks are usually larger than 50 acres in size and serve residents from throughout Kitsap County and beyond. No service standard exists for regional parks in Bremerton. These parks are usually designed to accommodate large numbers of people, and typically, they provide for diverse and intensive recreational activities, such as sports complexes, extensive trail systems or large picnic areas. Regional parks often include passive or natural areas and unique features. Pendergast Park is the city's largest regional park. The other two of Bremertori s regional parks focus on the downtown waterfront: Harborside Park and the Louis Mentor Boardwalk. While these sites are not of the size typical to a regional park, they do draw users from a very wide area. Additionally, as the Boardwalk expands to Evergreen Park, it will solidify the regional nature of the amenity and provide a significant visitor attraction to Bremertori s downtown core. REGIONAL PARKS Harborside Fountain Park 2.5 � ; Louis Mentor Boardwalk 2.0 � Pendergast Reg�onal Park 50.0 ; SUBTOTAL 54.5 � Greenspaces and Open Space Corridors Greenspaces and open space corridors provide visual and psychological relief hom man-made development within the urban area. Open space corridors are typically long, relatively narrow lands that follow roads, creeks, and other natural or transportation corridors. These corridors may protect environmentally-sensitive areas and provide wildlife habitat. Greenspaces and open space corridors are acquired with the intent of limited or no development and may offer limited accessibility or public recreation utility, such as a wetland property. CihLof Bremerton Comprehensive Plan City Service Appendix CS Appendix - 20 Exhibit C.2 GREENSPACES Bremerton Gateway R.O W. 7.0 SUBTOTAL 7.0 Natural Areas Natural areas provide amenities for passive recreation, such as trails, benches and environmental interpretive panels. Public access via rustic trails within these areas is important to provide passive recreational opportunities, as appropriate with resource protection and environmental regulations. The selection of natural area sites is based on a variety of criteria, including linkage to or through other open spaces, public facilities, relation to existing parks in the area, the need to preserve a site's natural features, and the size and quality of the open space. The primary difference between a site classified as "natural area' and a"greenspace" is that the natural area is intended to remain in a natural state, while also providing passive recreation opportunities, and is acquired or being retained as a site of unique environmental quality (i.e., extensive wooded hillside or ravine). NATURAL AREAS EastPark Nature Area 15.5 Kitsap Lake Park (wetlands) 30 0 Stephenson Canyon 28 0 SUBTOTAI 73.5 Trails Hiking, walking and cycling trails are in strong demand by residents of Bremerton. A trail may exist within a publicly acquired open space corridor or right-of-way or along railroad lines or utility corridors defined by drainage areas, topographical changes, wooded areas or vegetation patterns that can link schools, libraries or commercial areas with parks. The trail should be sufficiently wide enough to accommodate the intended type of trail user(s), preserve the features through which the trail is traveling and buffer adjacent land use activities. Trails may be developed in conjunction with various recreational activities, such as jogging, nature study and historic observation. They may be a separate facility, such as a fitness trail, or a connected element of a larger facility, such as a greenway trail. Surfaces will vary with location and use. Provisions for parking, consistent signage and interpretive markers may also be included in trail development. Cih� of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 21 Exhibit C.2 In order to provide an appealing, safe, accessible, economical and diverse trail system, trail standards and classifications should be developed and may be based on the following: Regional Trail: Paved, shared-use, long-distance linear trail corridors for the exclusive use of pedestrians, bicycles and other approved trail users. Regional trails are typically 12'- 14' wide with a 2' wide gravel shoulder on both sides. An example of a regional trail would be proposed expansion of the Bremerton Boardwalk. Community Trail: Paved, shared-use trails typically found within community parks or linking park facilities. Community trails are typically 8'-10' wide. The paths within Evergreen Park are examples of community trails. Rustic Trail: Earthen or soft-surface trails with limited horizontal clearances and challenging grades and obstacles. Providing accessibility and regular facility maintenance are issues typical of this type of trail. Rustic trails vary in width and surfacing. T'he trails of the East Park Nature Area are rustic trails. Water Trail: Navigable non-motorized and motorized waterways appropriate for canoe, kayak, and other boating. Providing launch facilities and non-motorized boat access points are important considerations in water trails. Bike Routes and Sidewalks: Typically associated with the transportation system, these linear paths are heavily used within urban areas and should be included in trail planning efforts. (See Non-Motorized Transportation Plan for additional information.) Special Facilities Special facilities include single-purpose recreational areas such as golf courses, conservatories, arboreta, display gardens and outdoor theaters. Special facilities also include community centers and pools, areas sites of historical or cultural significance, like museums, historical landmarks and structures, and public plazas in or near commercial centers, public buildings or other urban developed areas. There are no standards concerning the development of special facilities - demand being defined by opportunity more than a ratio standard. Nor are there minimum or maximum facility or site sizes - size being a function of the facility rather than a separately established design standard. Special facilities within Bremerton include the Gold Mountain Golf Course, Ivy Green Cemetery, Bremerton SkatePark and the facilities of the Bremerton Senior Center, Sheridan Community Recreation Center and Glenn Jarstad Aquatic Center. , . �Es CitU of Bremerton Comprehensive Plnn City Service Appendix CS Appendix - 22 Exhibit C.2 , . . � � Fvi..v. �i.nn 4�-...v. .. � 1-!. ..,. i. �l...v. '7'� .. . ' / • / / / 1 ���eve�e�ed-�e�es�e��ed—{�th�e�4-�} , T.. h'1"��Tt' � R3F�E-P�9 A�F@SS �VQ{A�EE� �81f@�ANC� �B�I �� �� A6F@S � � , 4 � , a-5 � a-e �s � � . . Citu of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 23 Exhibit C.2 � . . � . � . � . �3 . . � . 5 . . . � . � . . � . . 3a . . ��f`�i 9i�c'k�—��,�Y'-IES � i i � i � i n u i T•+h- rcrviv ° �ai AAa�-# Aa�-Na�e A�ess Be�re� ��eueFe�e� �e�a1 {As�e� EAs�esy As�es � � � City of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 24 Exhibit C.2 a-a . � . �e � . 8 e�leaes �4 . � . . . Cit�of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 25 Exhibit C.2 Ape�-�e . , � • , , , , , , . �a�le-Pk4-3 AAa�-# Ra�k-Pla�e A�ess c ''"�' "•^�'^�i � - - . � - - . 34 - . n,.i..... c..,.:�:�.:,.� . / T.. MTQR�r{.Tr�ebv "'.�'. '• �Q�F�o�e rqptO.T� � �Q�{Q�C�f y'VCQf � � ' `�•.... � , '1'�U t� . . �t . � .,}„i�, Q .. ,,,. .. �a„t,,,i,,..,,a i�„4 :�„i..a;�,. � ,.,,� irr„t,i,. nr� n� : j, j,:� :::::.t�.,. ., r : ��: �.� .A�., .,.�.��..� �dble-Pa4-4 Citu of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 26 Exhibit C.2 � �� �� �� �� 0 0 0 0 0 0 �^M^^��' ^� Future Demand for Parks �ee�s and Open Space Bremertori s park and open space land base has remained relatively static over the past 30 years with the exception of several prominent, but relatively small (in terms of acres) additions. These additions include 2.5 acre Harborside Park and a 1.7 acre expansion of Evergreen Park. Currently Bremerton has 8.9 acres of Parks and Open Space per 1,000 residents. The standard set forth by the National Recreation and Parks Association is 15 to 24 acres of park land per 1,000 residents. The city's goal of providing 5.5 acres of actively developed park land per 1,000 residents is 117 acres short of being met. The 2007 Parks, Recreation and Opens Space Plan establishes a policy to provide a neighborhood park within one half mile of every residence and a community park within a one mile radius of each dwelling. In some parts of town smaller pocket parks lacking the variety of facilities or land mass of a true neighborhood park currently substitute for the neighborhood park envisioned in the Plan. To meet the service radius policy the city could expand undersized neighborhood parks through acquisition of adjacent properties and/or acquire strategically located vacant parcels for developing new neighborhood/community parks. DESIRED STANDARDS Desired Service Standard 5.5 acres/1000 of developed parkland Desired Distribution Standard 1 mde radius for Community Parks 1/2 mile radius for Neighborhood Parks Desi�ed Minimum Size 10 acres for Community Parks 1.5 acres for Neighborhood Parks The 5.5 acres of developed neighborhood and community park land per 1000 residents is established as a standard independent of school athletic fields and sports courts. School facilities augment community and neighborhood parks, however their presence does not affect the applicability of the standard for the following reasons.l) School grounds are not available Cthl o{Bremerton Comprehensive Plan City Service Appendix CS Appendix - 27 Exhibit C.2 to the public during school hours. 2) School related athletic teams and events have priority on these facilities and may be closed to public use to protect turf for varsity events. 3) School grounds often dori t provide the level of grading, landscaping and amenities that combine to create a respite from the urban, built environment. Throughout the process of developing the 2007 Plan the concept of connecting city parks to one another through a network of trails, enhanced bike lanes and greenbelts was frequently mentioned by citizens. While progress has been made on providing linkages through the formalization of the Stephenson Canyon Greenway and the planned Boardwalk connecting downtown parks with Evergreen Park, there is considerable local demand for providing connectivity. By 2023 the city's population is expected to exceed 50,000. If no additional park acquisitions are made over the course of the next 13 years, the current deficit of developed park acreage per 1,000 residents will increase from 117 acres to 200 acres. � , , ��te-C���as ��-���e�es e��a��C �a��s-�e� �,9A9�ee . 'T''�;� : � �' ' �� ; T'.'��a� •/ , T �, ...1 .,L C.,«..;,.,, !T (lCl r r i i i • i • . / . � i i i �2Sk�2S: . r i i R«.,.V..,..�.,„�� .,.a� .,.,a ,�1�,�;,..,� i . �r.,,.:,...,.,t c�....a..,.a� �„� c,,,.,-t, �.., �rnn n,. „ �� �n .. .. � nnn ,. ,. c,... i,.,..,i .,,.a ,. ..i 7 � �� Cit�of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 28 Exhibit C.2 . , , , . . , . ... , . �te-t�-� �e As�es ��•°�,�AS , . a-4�asFes �4-64asfes . ' '�;-�� _ �-�3as�es �RME-6 �� c..,��� �.,:��w , a-4�as�es �64�asFes � , �.,,..,,� . �� rrt,,, ... ,,,-.,.,,a ... .,i.,,.;�., ,,., .,��, � .:,-t,:� ,-�,,, r•;�., ;� G�,. � �z nnn � ,..t„ t�.., . �m�z F ..... t .,�����«.. r �Y���« . � �.,.�..i ... ,.i.,,-:�� �c �n � c� �.,,.,,a ,... ,-t,,, ,. �� ,.:�., t:..,:�� ��.�...� t ,: t..A��« � , , n�,....,...,.a �;i.., n....�, �..,.:iu:,.,. Thr�P�rlc�-,,,a n„ .,�:,. �nm �nm r�,-„ �,. „i.,, ni ,- � ,-t�.,�. �r nc ,. • ,.t� - cPr �7CRLLSCi'[LTC"'aQ�tCq�T�[YI / / .,,.�:.,;�;,,� .,�1.1„�:,, F;.,1.-1.. .,.,,a ,. .,1 , „ L.,,,:1;+;.,� ....«.��...�� �««�. , r i r • fnrru��^� • •11 + ,-1,-1;�-' t '� •,-� .a F .. ., t. �t, k... ..,.. �. «� ._ u"�virrciC-ee ectiiracccrrcivrreercr��-rvrcrczzccca-rvr. CitU of Bremerton Comprehenstve Plan City Service Appendix CS Appendix - 29 Exhibit C.2 . ri,:,,,� „c ,a„�,,,,,,.,,,a �..,..,,-: � „ �,..,;, � 1 ..�« � � .,,a,a;�.:,..,..1 � .. C:,,l,a� i i E.'3 . Six-Year Funding and Proj ects The following Capital Improvement Program (CIP) lists the park and recreation facility projects considered for the next 6 years. The 20071ong-range Parks, Recreation and Open Space Plan contains a more comprehensive list of identified park improvements and acquisitions (pages 93- 98), covering a 20 year horizon. Funding opportunities for these projects shall be provided through available grant opportunities, real estate excise tax and park revenues. , T.. L.- rvvr'�a—� �`�-�r Citu of Bremerton Com�rehensive Plan City Service Appendix CS Appendix - 30 � Exhibit C.2 �`��� � �� � Project 2010 2011 2012 2013 2014 2015 Anderson Cove Waterfront Ac wsition - 500,000 Communi S orts Field Im rovements 100,000 100,000 Irri ation Lines to Street Trees and Flower Baskets 100,000 Jarstad Aquatic Center- Filtration/Chemical Feed System Up rades - 325,000 Jarstad Aquatic Center- Natatorium Li htin Im rovements 40,000 Kiwanis Park Redevelopment 200,000 305,000 Lions Park - Dock & Boat Launch Plannin Surve 75,000 Lions Park Renovation 1,700,000 50,000 Maintenance Facili Relocation - 373,900 Mataan Park Im rovements 130,000 495,000 - Off-Leash Do Park Pro'ect 25,000 Pendergast Re ional Park- Softball Field Development 320,000 Pender ast Re�ionai Park- Softball Field Renovation - 195,000 Pla round E ui ment Replacement - 30,000 30,000 30,000 30,000 30,000 Riddell Area Nei hborhood Park Acquisition 450,000 Shendan Park Redevelo ment - 400,000 Tennis Court Resurfacing - 40,000 Vehicle Equipment Additions - 75,000 Warren Avenue Pla ield Renovation 450,000 Total 2,130,000 1,408,900 130,000 1,970,000 30,000 930,000 • City of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 31 Exhibit C.2 Sanitary Sewer Sanitary sewer facilities are provided by the Bremerton Department of Public Works and Utilities. A complete inventory, analysis of need, and capital improvements program are provided in the T����m'��r ''nn'� August 2005 Wastewater Comprehensive Plan. The 200�5 Plan uses a 20-year planning horizon with intermediate planning timeframes of 5 and 9-years (i.e., 2010, 2014, and 2024.) �4. It therefore provides an analysis that satisfies the City 2003-2004 Comprehensive Plan Update's six year concurrency requirement. Service Area The Wastewater Comprehensive Plan identifies existing and future service areas served by the Wastewater Utility. The Wastewater Plan estimates the population of the service area at n�� 44,330, of which 37,260 �48 are within the city limits and 7,070 outside the city. The plan estimates that approximately 36,120 �?AA� persons are connected to the sewer system, leaving an unsewered population of 8,210. The service area covers 1�5 drainage basins, of which four extend beyond the city limits into unincorporated county areas: Tracyton Beach, Trenton Avenue, Sinclair Park, and Oyster Bay. The Utility provides sewage treatment to the sewered areas in the service area through direct service and through specific contractual agreements with the U.S. Navy and Kitsap County Sewer District No. 1(Navy Yard City). (Figure 2-2 "Service Area") Inventory of Existing Facilities The City sewerage system consists of sewage collection, transmission, treatment, and bio-solids reuse facilities. Included are more than 188 miles of gravity sewers, approximately 16 miles of pressure lines, and 3�7 pump stations. These facilities convey combined sewage to a secondary wastewater treatment plant located just south of West Hills. Additionally there are 1b3 combined sewer overflow (CSO) sites located within the sewer collection system. Approximately 60 percent of the system is composed of combined sanitary system. (Table SS-1) Table SS-1 Inventory: Wastewater Treatment Facilities Treatment Plant Address ANere�e-Baiy� Citu of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 32 Exhibit C.2 Capacity Westside BFer�e�#e�► Wastewater Treatment Plant 1600 Oyster Bay Ave W 32mgd-(3�-�A:� (>) � Eastside CSO Treatment Plant (1) 2475 Stephenson Avenue 20 mgd (throughput) Forest Enhancement Sites One & Two (2J Near Gold Mtn. Golf Course 300 acres (1J City of Bremerton Final Br� Wastewater Comprehensive P/an, A�'E99�. (Z) City of Bremerton Annual �993 Biosolids Report to Breme�ton-Kitsap County Health District Wastewater Treatment Plant The existing Westside Wastewater Treatment Plant is permitted for a peak hydraulic capacity of 32.0 �9-5 million gallons per day (mgd). Normal dry weather peak flow capacity without stormwater inflow is permitted for 7.6 ^�' �` 4 mgd. Current annual average and maximum monthly flows to the wastewater treatment plant are about 60 percent of the average annual and maximum monthly flows for which it is permitted �as desig�e�. Since 1993, the City has implemented a Combined Sewer Overflow (CSO) reduction plan to reduce CSO's to less than one per site annually. This was achieved primarily through infrastructure improvements that maximized flow to the Westside WWTP. In 2001, the City constructed the Eastside Treatment Plant at the site of overflow OF-1. Peak combined sewer flows are directed to this treatment during storms when system flows exceed the capacity to the Westside Secondary WWTP. This treatment plant uses ballasted sedimentation, high rate clarification followed by UV disinfection. This plant has a capacity of 20 mgd. c'�rm•. -.,;" • , � n.,;., :.,a..,,,,a a„t., �..,� ,.,,a,,,.,,a +�,,, ., ,,,- „c �.,.,��,,..,.,�-,,,, +,.,,,+�a �,., �n � n+_ . • . , . . , /T,.L.�C, C�71 Table SS-2 Bremerton Wastewater Treatment System Service Area Capacity Measure Capaciiy �AA3 2004 Demand 4994 2005 Surplus/Deficit Population 76,000�8 36,12^'.,�0 39,880353A9 Connections '33,043 �� 15,704-9�4� 17,339�-4,�6 Sources: F+pa�B�fi�Bremerton Wastewater Comprehensive Plan, 200 . � Cit�o{Bremerton Comprehensive Plan City Service Appendix CS Appendix - 33 Exhibit C.2 ��� � * Connections = Population capacity / 2.430 average persons per household size (A change in average household size would change the number of possible connections ) Forest Enhancement Program -- Biosolids Utilization The wastewater treatment plant produces approximately 5.8 million gallons of anaerobically digested biosolids each year. Because biosolids have fertilizer and soil amendment value the City began an active land application (silviculture) program several years ago to utilize the benefits of this wastewater process. Biosolids are used to enhance tree growth and are currently applied to 300 acres of Utility-owned forest land. Since June 1992,100 percent of the biosolids produced at the treatment plant have been utilized in this beneficial manner. Future Needs Existing Demand There are approximately 15,704 �4� existing connections, including several connections at the Puget Sound Naval Shipyard (PSNS), serving approximately 36,120 �5A8 people in the service area. The annual average daily flow is 4.0 �8 mgd. Level of Service (LOS) The capacity of existing sewer facilities to serve future needs is determined by comparing the gallons of effluent per day now approved by the State, the number of existing connections, and the number of new people to be served. The number of new people is converted into the number of new residential connections based on assumptions of the number of persons per household, and the number of gallons of effluent generated per capita per day (gpcd). The capacity can also be estimated based on an existing and planned LOS for sewer service. The calculation of the current LOS excludes stormwater inflow. The proposed LOS is the existing county-wide average. • Current LOS = 9�8 gallons per capita per day • Proposed LOS =100 Future Demand City and County estimates of future demand differ. (Tables SS-3 £� SS-4) Ctty o{Bremerton Comprehensive Plan City Service Appendix CS Appendix - 34 Exhibit C.2 ��� �, • � „ �, �� � . .. � �e{t�t#��e�eFas�s���4�e���Ee-a�e,�P�t�e�o� ��nQ „ ,.� ���o��z F aa; ,��i a n�� ,-• t, �m n �e�'S�e�S� e-Ce�t�#� p�rejee�s-�eed rvTi cviaccccivreso��cui�._�zr � City Estimate: The City's Wastewater Comprehensive Plan estimates the 20043 service area population at 44,330 �99, of which 1b9% are outside the city limits. All but 8,210 persons are connected to the sewer system. Assuming 100% of this unsewered population will connect to the system within the next 20 years, there is a remaining capacity to serve an additiona113,000 persons. The City estimates that the actua12014 service area population will be 45,198 �5-a88 (rather than 81,408 as forecasted by the County). � � Table SS-3 ; � � � � -, Comparison ,of City/County Estimates of Sanitary Sewer Service Area Population .�"Source of Estimate �994 2000 Population 2014 Population 4994 2000-2014 Increase • County 68,425 �� 81,408 12,983 �-9�3 City 37,259 �.?5A8 45,198 �5 7,939-�-A69 Difference = 31,11�'.,�� 36,210 4� 5,044 TC�T.TJ Sources� City of Bremerton F+�a�Bfa#-Wastewater Comprehensive P/an, A�99� 2005. , o The City projects a year 2014 �� surplus capacity of 30,802 -�'� (compared with the County projection of a deficit capacity of 5,408�). Tnble SS-4) ' ° , Table SS-4 ` � � Comparison of City/County Estimates of Wastewater Treatment Plant Demand (Population) . • C�ttLof Bremerton Comprehensive Plan City Service Appendix CS Appendix - 35 Exhibit C.2 Source of Current-�994 �99 2004 �AAA-Be�er�d 2014 Demand Total Deficit or Estimate Capaciiy Demand Surplus County (�} 76,000-5�'� 68,425 3�668 -68 81,408 -5,408A� City {� 76,000 �AA9 36,120 37 �� 45,198 +30,802 � �� Difference = --�4�9 32,305 8 -�8 36,210 36,210 G,� �� Sources: City of Bremerton �WastewaterComp�ehensive Plan, ^.���:�"^'_ 2005 Note: The discrepancy between the City and County estimates is due to the calculation methods utilized between each entity. Kitsap County generated their caculations from 1990 Transportation Area Zones (TAZ) data to define the City� s service area, these areas go beyond Bremerton� s wastewater service areas. The City of Bremerton utdizes current customer billing data and adopted service areas for estimates of future need. o , Tl-..,�„ „��-;..�.,�.,� ,.F � .��-�„�, ,. ,.;+<. ,-1;CC.,« G,,« � ,...1 « .,�.,.,,. �< .,,... ------ ---°°--°--- -° -- ° -° -� ---°° - -°-°-� --°°°-° °-° -- ° -°-°° °--°--°-_. . / i . � �� u i t.l. .. !] „ ' i i i 0 i • Household Size — The average household size is used to calculate the number of connections to the system. The County estimate assumes an average household size of 2.65 persons per household (pph), the 1990 county-wide average. The City estimate assumes 2.430 pph, the �99 2004 service area household size as calculated in the City's Wastewater Plan. Cit;u of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 36 Exhibit C.2 '�e�t�xe�tt-�'�t-��� Ea$ac��-(�e�t��a��e� , , • ---------- = --- --,-=-, ---- =-� ------= --- -- -- -- =— o � 2014 Demand • , , , . Refer to table -2 in the City's WW Comprehensive Plan. Six-year Forecast o � ' ' ' . . � . Refer to table -2 in the City's WW Comprehensive Plan. �a�le-SS-� �� �Y ��Y f�) �R� s�ss six�feaFPJeed 3�8A8 �899 3-�A-AAG9 ',� � 8:�-+�68 Citu of Bremerton Comprehensive Plnn City Service Appendix CS Appendix - 37 Exhibit C.2 �� � a-�-�se ��3 � _ ��r�va �' �WBR�h�$aF o �� �i � �-�9� -a-4- a--a-�-RAE7B �� �� c n�vn ��' T..}..1 �fIAA 7A� A I..�rr....... - ��'IT T7Ri TT7II 0 Need for Capital Facility Improvements for Capacity The Wastewater Plant has the capacity to serve a population of 76,000, which is greater than the projected 2014 population of 45,198. , . , , nt..«� ,.c nat�,,,. n,.,,�,:a,.«� 'r�.,, r�;,.�.,.. r n„�.i;,. �n�,.,.i.� r�,,,...,«�-,.,,,.,� �n�.,�}„�.,.,�„« r�:.,;�;,,., :„�t,,, .�, „C �.... �_.��u �.�,.�r«�� � �.,,.:i;�;,,,. �,. ,. ,,,..,.,,a .. ,,,a� --�------- -- --- - = r='�;------ ----_.,. Proposed Facilities The Wastewater Plan recommends four types of improvements at the treatment plant to accommodate projected sewage flows at ultimate plan service area development and to solve some current and anticipated operational problems: • Infrastructure improvements -- repairs or replacements of existing sewer system facilities to restore structural integrity; • Regulatory requirements -- improvements needed as a result of new or modified codes, guidelines, or laws initiated from federal, state, and local government; • Growth and system extensions -- improvements resulting from new development or system extensions; • Other system improvements -- recommendations that contribute to the improved operation or function of the system but are not a result of infrastructure needs, regulations, or system growth. CitU of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 38 Exhibit C.2 Six-Year Financial Plan It is estimated that the existing sanitary sewer system has 8 million gallons per day (mgd) available capacity, which is sufficient to meet the total need of 5.23 mgd through the next six years. (This assumes removal of stormwater from the system over the next several years under the City's CSO Reduction Plan.) CittLof Bremerton Comprehensive Plan City Service Appendix CS Appendix - 39 Exhibit C.2 �e-ss-� �ea�P�e�ee�s Faei�i�e►�{y Net�Fesew�e� Req�iFe�AS Availeble Bef�eieRey �994 �-�-�SB �B ' ��,� � nn�n �B �B �g �� �+ *k **1t * ** t<* Operating Costs It may be useful to consider the impact of each completed capital improvement on the City's future operating budget. An analysis of operating costs is optional; it is not required by the Growth Management Act. Proiect 2010 2011 2012 2013 2014 2015 Graviry Sewers 7,650,000 1,725,000 725,000 2,325,000 5,350,000 600,000 Forcemains 200,000 475,000 2,250,000 2,250,000 0 0 Beach Sewers 155,000 1,255,000 1,200,000 200,000 0 25,000 Low Pressure Sewers 250,000 1,500,000 1,500,000 0 0 0 Inverted Siphons 0 0 0 75,000 400,000 0 Pump Stations 500,000 725,000 710,000 650,000 875,000 875,000 Treatment 40,000 150,000 125,000 125,000 407,000 830,000 Re-use 10,000 0 0 250,000 0 0 Outfalls 0 100,000 450,000 0 250,000 2,500,000 ULID's 0 0 200,000 4,440,000 13,847,000 5,000,000 Buddmgs 30,000 0 0 0 50,000 0 Land 0 0 0 50,000 0 500,000 Comprehensive Plan 0 250,000 0 0 0 0 Eqwpment 20,000 20,000 20,000 20,000 20,000 20,000 TOTAL EXPENSE 8,855,000 6,200,000 7,180,000 10,385,000 21,199,000 10,350,000 CitU of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 40 Exhibit C.2 Water The City of Bremerton Water Utility (Water Utility) provides potable water within the City and the surrounding area. A complete inventory, analysis of need, and capital facilities program is provided in the adopted�9�-� 2005 City of Bremerton Water System Plan Update. �^"��'^ }'�^' °°� �The water demand projections are for the period 2005 through 2024. Consistency statements were received by both the City of Bremerton and Kitsap County, and therefore the data can be used to address the concurrency requirement. Inventory of Existing Facilities Service Area The Water Utility serves a population of approximately 56,000 in Bremerton (80% of the water use) and portions of Kitsap County (20% of the water use). This use includes the City's West 517 Zone system (considered a separate system by the Washington State Department of Health (DOH)) and contracts to supply water to the Puget Sound Naval Shipyard (PSNS) and to the City of Port Orchard. The Water Utility also is under contract to provide water and operation and maintenance to the ���and Rocky Point Water Districts. The current service area includes approximately 13,800 acres. The Kitsap County Coordinated Water System Plan also documents water service areas and system responsibilities within those service areas. Capacity and Water Rights � The Water Utility supply consists of the Union River Reservoir behind Casad Dam and 1�3 active production wells. Approximately Er50 percent of the supply comes from the 2,964-acre Union River watershed, which is 98 percent owned and controlled by the Bremerton Water Utility. Wells in multiple aquifers supply groundwater to the system. Current average daily demand is approximately 8 million gallons per day (MGD). The current capacity of the water system is 1�6.9 MGD for an average day demand and 2�9.5 MGD for a maximum day demand. The Union River supply has such exceptional water quality, it is one of the few surface water systems in the country to be allowed to operate unfiltered by DOH. This does mean, however, that during unusual events such as when high winter rains increase the turbidity (a measure of water clarity) or during a drought, surface supplies may not always be fully available. During these times the City must depend on well supplies to meet demands. The firm yield from the Union river is 5.6 MGD. All water in use by the City has been properly appropriated through certificates of water rights or registered claims. The agency with regulatory oversight of water rights is the Washington Department of Ecology (Ecology). Bremerton's groundwater rights consist of 12,�8g631 acre- feet/year (ac-ft/yr) annual quantity of primary rights,1,408 ac-ft/yr annual quantity of supplemental rights, �8,675 gallons per minute (gpm) instantaneous rights, and 880 gpm Cih� of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 58 Exhibit C.2 supplemental rights. Bremertori s surface water rights consist of 40 cubic feet per second (cfs) instantaneous rights from the Union River. Historically-used surface water claims of 5,000 ac- ft/yr from Gorst Creek and 3,000 ac-ft/yr from Anderson Creek are maintained for emergency use and potential future use pending required treatment. Water Quality The Water Utility provides high quality water which is verified by an extensive monitoring program that goes beyond minimal requirements. The regulatory agencies that provide oversight for drinking water quality are US EPA and DOH. The Water Utility meets all the protective standards set by the federal Safe Drinking Water Act and state laws and regulations. The Water Utility practices a multiple-barrier approach to protecting water quality from the source to through the distribution system. Bremerton's Union River surface source is of such excellent quality that it is currently approved to remain unfiltered. Groundwater sources are safeguarded by a Wellhead Protection Program. All sources are disinfected with chlorine and chlorine residual is maintained throughout the system. In 1999, the corrosion control facility was completed to adjust the pH of the water to prevent corrosion of internal plumbing. Underway is the construction of an advanced disinfection facility which will provide ultraviolet light disinfection to comply with federal drinking water regulations. This treatment is anticipated to be on line by the end of 2010. An annual water quality report is provided to all customers and is available on the City's web site. Facilities A summary of the Bremerton water system is provided in Table 1. Table 1 Bremerton Water S stem Summa Sources currentl in use Union River and 1�3 roduction wells 5-Year avera e da demand .�33 Mdlion Gailons er Da E uivalent Residential Unit 200 allons er da er sin le famil residence Number of Connections 16,A�2361 Po ulation served 56,000 Mdes of Pi e 291 mdes Number of Reservoirs 3 raw water, 17 treated water Number of Pum Stations 10 Number of Pressure Booster Stations 6 Number of Pressure Reducin Stations 14 Number of Pressure Relief Valves 7 includes 2 sur e antici ators Service Area 13,800 Acres not includin the watershed Pressure Zones 256, W440, W517, W580, W650, E240, E398, E490 Disinfection Chlonne and UV antici ated b 2010 Treatment H ad'ustment for corrosion control There are se�e� eight pressure zones in the system designated by the overflow elevations in Utility reservoirs. The water system control and alarm is provided through a telemetry system. Cit�o{Bremerton Comprehensive Plan City Service Appendix CS Appendix - 59 Exhibit C.2 Operations staff are certified and the system is operated in compliance with all federal and state regulations. Fire Flows A major function of the water supply and distribution system is to meet fire flow demands. This section summarizes the fire flow requirements applicable to the Bremerton water system, which serves areas both inside the city limits and in unincorporated Kitsap County. Bremerton serves water to residential and commercial structures in three fire districts: • City of Bremerton (within city limits) • Central Kitsap Fire and Rescue (north of the city limits) • South Kitsap Fire and Rescue District #7 (south of the city limits and Port of Bremerton) The Bremerton Fire Department adopted by ordinance Appendices B and C of the International Fire Code (IFC), listed in Table B105.1 in the IFC. The Kitsap County Fire Marshal's office adopted a separate fire flow and hydrant placement, Ordinance 323(A)-2005, amending the IFC. The fire flow requirement for specific projects is dependent on many factors, including the following: • Size of the structure(s) • Location of the project • Type of construction materials • Number of stories • Building fire protection systems (sprinklers, automatic fire doors, etc.) • Proximity of adjacent structures • Type of building occupancy (storage of flammable materials, etc.) For purposes of this water system plan, minimum fire flows to be provided by the Bremerton water system have been identified as: Residential 1,000 gpm for 2 hours Commercial 1,500 gpm for 2 hours Fire flows required by the IFC are considered minimums for new construction. When evaluating new construction, Bremerton Public Works and Utilities Department personnel shall determine the ability of the water system to meet fire flow requirements at that location with a minimum of 20 psi residual pressure throughout the distribution system. If the water system cannot provide the required fire flow for the specific project, the developer is required to revise building construction and/or make the necessary improvements to the distribution system to meet the project's fire flow requirements as established by the Fire Marshal. Cit�of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 60 Exhibit C.2 The Washington Survey and Rating Bureau is a non-profit organization funded by subscribing property insurance companies in accordance with the Washington State Insurance Code. They are tasked with rating the fire fighting and protection abilities for municipalities. This rating is then used by insurance companies for setting rates. The water system's capability is 39 percent of the total rating score. Bremerton's last survey was completed in 1997, and the water system ranked as Class II, an excellent rating. The hydraulic analysis of fire flows for the Bremerton water system is discussed in Section 8, fire flow and storage requirements. Bremerton analyzed storage capacity without nesting fire suppression and emergency standby storage. , , , ��„ �a �}.,�a�,� ,.�„ .,�.,, .,�, .,�•., :�. ��.,��b� �..� �..�.����r�r- , , , o . � �-1.., . .,�-.,« � ,��,,... « ..1.,,,� .,� r'1.,�� TT „11,,.,� «..�-:.,.,. ,..... .....«.r ,s`� � ^ Forecast of Future Needs Existing Demand �'�� -. � .. a�;i., . ..,..... ., ,�,.,,,�, a,.....,„a :„ �nn� � � � r,r�n The 5-year average is 7.�33 � u��r . , MGD. Figure 1 shows the average day demand (ADD) and maximum day demand (MDD) since 1994. Cih/ of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 61 City of Bremerton Water Production �s.o ibit C.2 t50 149 State 16.0 �i2z a 141 139 C 14 0- ��13 4 6/19 ���g Drought 7/1g 8�6 Drought � 129 l�C� 12.3 �. %1 � 8/14 /i �7/14 0. �2.� N 0 10.0 � 80 � � 8 � 8 8 � � � 6 v 6.0 � 40 2.0 0.0 -, � , � , 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 O Average Day Demand ■ Maximum Day Demand Figure 1 Source: Bremerton Public Works and Utilities Department As shown in Figure 2, approximately 80% of the water demand is "in-City" demand, and 20% outside the city limits. I'SNS is the largest single water user with an average day demand between 2 - 3 MGD. City of Bremerton 2008 Water Demands by Location Av�erage Day Demand = 6.6 Million Gallons per Day Navy Properties 34% Within City Limits 45% Rocky Pt Water District Non- 0 2 ° revenue County 1% 17% Figure 2 Source: Bremerton Public Works and Utilities Department Average day demand is affected by the year's rain patterns and other factors. For example, 2007 & 2008 were mild summers �}9� �•��� ��••�} ���-M^��r, resulting in less outside water use. The highest MDD ever recorded in Bremerton was 20 MGD during unusually low temperatures in December 1990 when pipes broke and customers ran water to prevent pipes from freezing. 2001's drought affected Bremertori s surface supply and the Water Utility requested a voluntary 10% reduction in water use that summer. Customers responded with an 18% reduction in use which averted a need for water restrictions. Level of Service (LOS) Standard Citu of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 62 Exhibit C.2 The estimated �� 2005 LOS is a daily average of 200 gallons per equivalent residential unit. The Equivalent Residential Unit (ERU) is the amount of water consumed by a typical full-time single family residence. This value is calculated by dividing the amount of water used by single family accounts that used water in all of the year's billing cycles by the total number of single family accounts. The value for an ERU is specific to a particular water system and reflects the characteristics of a water system's customer base and weather patterns. ERUs are used by DOH to calculate a water system's capacity. For example, if a system has been determined to have capacity to serve 100 single family homes, it would be able to serve any combination of commercial, industrial, or residential customers equivalent to the needs of 100 single family homes, that is, 100 ERUs. Currently Bremerton has the capacity to serve in excess of 50,000 ERUs. The Puget Sound Naval Complex is equivalent to about 10,000 ERUs. Bremertori s ERU value of approximately 200 gal/day/ERU is on the low side when compared to other systems in Kitsap County and the state. Reasons for this include: Smaller urban lot sizes common in the service area use less water for landscaping. A high rental population - Bremerton is about 60% rental housing while the national average is about 40%. Renters may tend to use less water, since they sometimes do not have dish or clothes wahssers and usually do not use as much water maintaining landscapes. es�ee�� ^..� An effective conservation program. Bremerton has actively worked with customers on conservation since 1992. � An effective public awareness campaign during the summer 2001 drought. Bremerton requested 10% voluntary conservation and customers saved 18% that summer. Customers a� appear to be continuing ^�-���onservation ^�^��..r :��� �nn� A relatively high sewer rate based on water use. The ERU values for Bremerton continue to decline. This is due to the reasons listed above plus the implementation of plumbing regulations in 1992 that require newly-installed toilets to use only 1.6 gallons per flush. The City's conservation program is expected to reduce per unit consumption by an average of 3% over the next 10 years. Domestic unit demands are then expected to remain constant. Future Demand The �� 2005Water System Plan demand projections were based on data from the �98 2000 census and the �� most recent Bremerton Comprehensive Plan. .'. . Figure 3 rresents the rorulation forecast used. The �� 2005 Water System Plan identifies needs for a 20-year planning period from �9-9 2005 to �8�9 2024. During that time it is expected that ADD will increase from 8 MGD in �9-9 to � CittLof Bremerton Comtirehensive Plan City Service Appendix CS Appendix - 63 Exhibit C.2 MGD by year �9. MDD is expected to increase from �415.6 MGD to �-3 22.6 MGD during this same time period. Figure 4 presents the demand forecast used. Residential Po ulation Forecasts Cit of Bremerton Main S stem Water Su I Area Bremerton Retail Water Service Population Served by Bremerton Total Area Po ulation Throu h Contract Population Year Inside Outside Jackson Rocky Point Served by PSNS & City of City City Total IMF Park Navy Water Limits C,imits Housing District Bremerton System � POPULATION HISTORY 2000 35,103 13,2i1 48,314 109 2,047 1,636 52,106 2001 34,009 �3,246 47,256 1,040 2,211 1,646 52,152 2002 33,184 �3,282 46,466 1,972 2,374 I,656 52,468 2003 33,289 13,317 46,606 2,903 2,538 1,667 53,714 2004 32,078 �4,203 46,281 2,903 2,539 1,704 53,427 � POPULATION FORECAST 2005 34,431 15,090 49,521 2,903 2,540 1,740 56,704 2006 35,002 �5,977 50,978 2,903 2,541 1,777 58,199 2007 35,572 �6,863 52,436 2,903 2,543 1,813 59,695 2008 36,143 17750 53,893 2,903 2,544 1,850 61,190 2009 36,714 �g,637 55,351 2,903 2,545 1,886 62,685 2010 37,285 �9,523 56,809 2,903 2,546 1,923 64,180 2011 37,856 z0,410 58,266 2,903 2,547 1,959 65,675 2012 38,427 �� 297 59,724 2,903 2,548 1,996 67,L70 2013 38,998 2� �g4 6l,(81 3,903 2,549 2,032 68,666 2014 39,569 23,070 62,639 2,903 2,550 2,069 70,161 20i5 4Q139 23,957 64,096 2,903 2,552 2,105 71,656 2016 4Q710 ?4,844 65,554 2,903 2,553 2,141 73,151 2017 41,28t 25,730 67,O11 2,903 2,554 2,178 74,646 2018 41,852 26,617 68,469 2,903 2,555 2,214 '76,141 2019 42,423 2�,504 69,926 2,903 2,556 3,251 77,637 2020 42,994 Zg,390 71,384 2,903 2,557 2,287 79,132 2021 43,565 29,277 72,842 2,903 2,558 2,324 80,627 2022 44,136 30,164 74,299 2,903 2,559 2,360 82,122 2023 44,708 31,050 75,759 2,903 2,561 2,397 83,619 2024 45,208 3i,937 77,145 2,903 2,562 2,433 85,043 ulahon data supplied by [he City of Bremerton Department of Commumty Development w�th the followmg me[hodology. I Transportation Analysis Zoncs (TAZ) data provided by Krtsap County, Novembcr 2005 2 TAZ Smgle Family (SF) and Mul[i Famdy (MF) Houscholds providcd for basc ycar 2003 and pro�cctcd ycar 2025 3 SF and MF Houscholds agbaegated to total number of houscholds per "CAZ 4 Smgle Family (SF) and Mulh Famdy (MF) Households for 2000 from Jata prepared at time of 2004 Bremerton Comprehensrve Plan .itsap Household S¢e from "lAu�rrntrve Hou�chold nnd Person per /lousehold Pro�ectmne Usmg t{ee GhG! Pop�dntton Pro�echone 005 & ?0! D" CTED 6 2010 Houschold S¢e for IGtsap County, from Alternative 2 Trended Headsh�p Retes (assumed), sec note 5 abovc 7 2000 His[oncal F�gure from TAZ figures used at Ume of Bremerton December 2004 Comprchensrve Plan S Analys�s is different from 1999 WSP, as PSNS and Jackson Perk populahons were mcluded m the City's populahon hanges from 1999 WSP Populnuon for PSNS and lackson Park now separate from the Gty's, and Tracy[on now mcluded m )utside City Limi[5 Figure 3 Source: �9 2005 City of Bremerton Water System Plan Update Ctt�of Bremerton Comprehenstve Plan City Service Appendix CS Appendix - 64 Exhibit C.2 City of Bremerton Main System and Contracted Water Sales Historical shaded and Forecasted Water Use b T e of Use in MGD Single-tam�ly �lulh-family Average Average Commercial Irdgation Nary Contracts Nomrevenue Water Rocky Nax Day Max Day Res�dential Residential City of Day Day Pomt Demand Demand Port Demand Demand Year Wi�h Without With W�thout With W�thout With W�t6out With Without With Wrthout H'ater Orc6ard Without W��hout N ,�� h With Conserv Conserv Conseo- Conser- Conserv Conserv Conserv Conserv Conserv Conserv Conserv Conser- District Con[ract Conser- Conserv Conserv Conser- vation vahon vation va[ion va[ion vation vation vadon vation vapon vation vat�on Contrect vat�on �ahon pation vat�on 1999 Z 54 NA 0 82 NA 0 96 NA 0 20 NA 2 70 NA 0 54 NA 0 12 0 08 7 96 13 46 2000 2 51 NA 0 80 NA 0 88 NA 0 22 NA 2 51 NA 0 71 NA 0 12 0 13 7 87 13 90 2001 2 32 NA 0 76 NA 0 88 NA 0 I S NA 2 62 NA 0 52 NA 0 10 0 00 7 38 11 56 2002 2 55 NA 0 77 NA 0 86 NA 0 23 NA 2 35 NA 0 22 NA 0 12 0 04 7 14 14 30 2003 2 48 NA 0 71 NA 0 91 NA 0 28 NA 2 40 NA 0 29 NA 0 13 0.04 7 24 14 50 2004 2 63 NA 0 69 NA 1 06 NA 0 30 NA 2 27 NA 0 30 NA 0 13 0 OS 7 43 14 88 2005 277 280 074 074 113 113 032 032 223 22S 044 045 013 005 79I 1582 781 1563 2006 2 S5 2 88 0 76 0 76 1 16 I 17 0 33 0 33 2 19 2 28 O 45 0 46 0 14 0 10 8 12 16 24 7 98 15 95 2007 2 92 2 96 0 77 0 78 1 21 1 22 0 34 0 34 2 I4 2 29 0 47 0 48 0 14 0 25 8 47 16 93 8 24 16 48 2008 2 98 3 04 0 79 0 80 I 25 1 26 0 35 0 35 2 10 2 30 0 47 0 49 0 14 0 25 8 63 17 27 8 34 16 67 2009 3 04 3 12 0 81 0 82 I 29 I 31 0 36 0 36 2 OS 2 31 0 48 0 SO 0 14 0 25 8 81 17 62 8 42 16 85 2010 310 320 081 084 133 135 036 037 206 231 048 051 0IS 025 898 1796 854 1708 20l 1 3 I S 3 27 0 84 0 86 1 37 1 39 0 37 0 38 2 06 2 32 0 49 0 52 0 I 5 0 25 9 15 18 29 8 69 17 37 2012 3 22 3 3S 0 86 0 88 1 45 1 48 0 38 0 39 2 07 2 33 0 50 0 S3 0 I S 0 25 9 3'/ 18 73 S 89 17 77 2013 3 27 3 43 0 88 0 90 1 53 1 57 0 39 0 40 2 OS 2 34 0 51 0 54 0 I S 0 25 9 59 19 17 9 07 18 13 2014 333 351 090 093 161 166 040 041 208 234 052 056 016 025 981 1962 925 1851 2015 3 40 3 58 0 92 0 95 1 70 1 75 0 41 0 42 2 09 2 35 0 54 0 57 0 16 0 25 10 03 20 06 9 47 18 94 2016 3 48 3 66 0 94 0 97 1 73 1 83 0 42 0 42 2 10 2 36 0 54 0 58 0 16 0 25 10 24 20 47 9 62 19 23 2017 3 55 3 74 0 96 0 99 I 85 1 90 0 43 0 43 2 10 2 37 0 56 0 59 0 16 0 25 10 44 20 87 9 87 19 73 2018 3 62 3 82 0 98 I 01 t 94 I 99 0 43 0 44 2 1 I 2 37 0 57 0 60 0 U 0 25 10 66 21 31 10 OS 20 16 2019 3 70 3 89 I 00 1 03 2 01 2 07 0 44 0 45 2 12 2 38 0 58 0 61 0 17 0 25 10 86 21 73 10 27 20 54 2020 3 77 3 97 I 02 1 OS 2 09 2 I S 0 45 0 46 2 I2 2 39 0 59 0 63 0 17 0 25 1 I 07 22 15 10 47 20 95 2021 3 84 4 OS I 04 I 07 2 18 2 24 0 46 0 47 2 t 3 2 40 0 61 0 64 0 17 0 25 1 I 29 22 59 10 69 21 38 2022 3 92 4 12 I 06 I 09 2 25 2 31 0 47 0 48 2 I4 2 40 0 62 0 65 0 18 0 25 I I 49 22 98 10 88 21 76 2023 3 99 4 20 1 08 I I I 2 34 2 40 0 48 0 49 2 14 2 41 0 63 0 66 0 18 0 25 I I 71 23 42 I I 09 22 19 2024 4 06 4 27 I 10 1 13 2 42 2 48 0 49 0 50 2 I S 2 42 0 64 0 67 0 I S 0 25 1 I 91 23 83 I I 29 22 58 Assumphons I Smgle Famdy water use wdl mcrease at [he samc rate as populat�on growth New homes will be bu�lt w�th water etlic�ent plumbmg accordmg to lhe federal Energy Effic�ency Act 2 Mulu-famity water use wdl mcrease at the same rate as populanon growth New umts w�ll be budt with watcr effic�cnt plumbmg accordmg to the federal Energy hfticiency Act 3 Commerc�al water use will mcrcase at lhe samc rate as populat�on growth Addihonally, [he West I Iills mdus[nal arca is ant�c�pated [o begm m 2007, and Ihe K�isap Lake mdustnal area �s antic�pated to begm m 2012 4 Irngation usc will mcrcasc at [hc samc ratc as population growth 5 Navy mdush�al uae w�ll dccrease wrth �mplementation of wnscrvation programs Navy resident�al use will mcrease shghtly w�[h populahon 6 Roc.ky Pomt watcr usc wdl m�rcasc at thc samc. ratc as populapon growth for thet arca 7 Qty of Port Or�hard water use will merease to th� max�mum amount allowed m the mtedocal agreement 8 Non-revcnuc Watcr assumcd [o bc 6 perccnt of totel customcr watcr sslcs 9 Fomcastcd Ma�umum Day Dunand �s forccastcd Avcragc Day Ucmand mul�iphcd by 2 10 Assumpt�ons uscd to celudetc dcmanJs under thc "with conscrvation" sccnarw arc dcscnbcd m Sce[�on 2 S 2 Figure 4 Source: �9 2005 City of Bremerton Water System Plan Update Cit�of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 65 Exhibit C.2 West 517 Zone Historical (shaded) and Projected Water ADD in MGD Water IIse Within West 517 Zone System Water to Other Systems Total West Total ERUs South Kitsap Aero Mobile West 517 Golf Course Intertie to Year Commercial Industrial Total Estates (Master 517 Zone 2one , Irrigation �, Main System �ter) 1999 0.035 0.208 0.000 0.243 0.010 0.015 0.268 1,340 2000 0.035 0.204 0.000 0.239 0.000 0.012 0.251 1,255 2001 0.035 0.135 0.000 0.170 0.020 0.012 0.202 1,010 2002 0.035 0.181 0.000 0.216 0.130 0.010 0.356 1,780 2003 0.035 0.178 0.000 0.213 0.350 0.014 0.577 2,885 2004 0.035 0.180 0.000 0.215 0.420 0.011 0.646 3,230 2005 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990 2006 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990 2007 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990 2008 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990 2009 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990 2010 0.075 0.200 0.090 0.365 0.150 0.013 0.528 2,640 2011 0.090 0.200 0.180 0.470 0.150 0.013 0.633 3,165 2012 0.105 0.200 0.270 0.575 0.150 0.013 0.738 3,690 2013 0.120 0.200 0.360 0.680 0.150 0.013 0.843 4,215 2014 0.135 0.200 0.450 0.785 0.150 0.013 0.948 4,740 2015 0.150 0.200 0.540 0.890 0.150 0.013 1.053 5,265 2016 0.165 0.200 0.630 0.995 0.150 0.013 1.158 5,790 2017 0.180 0.200 0.720 1.100 0.150 0.013 1.263 6,315 2018 0.195 0.200 0.810 1.205 0.150 0.013 1.368 6,840 2019 0.210 0.200 0.900 1.310 0.150 0.013 1.473 7,365 2020 0.225 0.200 1.000 1.425 0.150 0.013 1.588 7,940 2021 0.240 0.200 1.100 1.540 0.150 0.013 1.703 5,515 2022 0.255 0.200 1.200 1.655 0.150 0.013 1.818 9,090 2023 0.270 0.200 1.300 1.770 0.150 0.013 1.933 9,665 2024 0.285 0.200 1.400 1.885 0.150 0.013 2.048 10,240 Assumptions: 1. Commercial use in the West 517 Zone is assumed to increase through the McCormick pro�ect and NASCAR. 2. Golf course irrigation will stay the same on average. Values are total use averaged over the year. 3. SKIA will grow according to the estimate provided in the 1999 Subarea Plan between 2010 and 2029. 4. Intertie to the Main System varies depending on needs; value used is the average from 1999 to 2004. 5. Aero Mobile Estates is at build out; value used is the average from 1999 to 2004. 6. ERU calculated using value from the Bremerton Main System: 200 gallons per day per ERU for ADD. 7. More water than usual was supplied through the intertie in 2003/04 due to drier than normal weather. Figure 4 Source: 2005 City of Bremerton Water System Plan Update CittLof Bremerton Comprehensive Plan City Service Appendix CS Appendix - 66 Exhibit C.2 Proposed Facility Improvements Water Utility improvements are discussed in more detail in the �33 2005 Water System Plan Update. Chapter 9 of this plan outlines a 20-year Capital Improvement Plan (CIP). Each year the Utility fine-tunes its 6-year CIP which is presented at the end of this section. Water Sources The Water Utility has sufficient water to meet demands for the next six years. From a water rights standpoint, the Water Utility has a}�p°^••^� sufficient water rights for the near future. , ' . , ,-„ , „ ��.,, r ..,�,,,. .,..,a �....,a,..,,,i;,, ,. ��.,.,,,,,,. a,. ...,.,- .,ii„�., .,n � � ,.,. �.,, , ,a $��L�}�a�e9l�s���'e�eE�S-��Sfr�Se�ss�12S-cricir,SCCa-irr�'cii. cir To ensure reliability and redundancy, it is the Utility' s goal to be able to meet average day demands with groundwater only. Future water rights will be from groundwater. The Water Utility has several water rights applications submitted to Ecology: Change application for five Domsea Wells with a priority date of 1992. New application in Gorst for 1,000 gpm with a priority date of 1992 One new application for We1121 with a priority date of 1992 One new application for 1,000 gpm for We119 with a priority date of 1994 Processing of new applications has been stalled for many years due to staffing and resources at Ecology. Ecology's focus will be on processing change applications first and it is not known when they will begin on new applications. Water Quality Meeting strict water quality standards is a primary objective of the City. Drinking water is regularly tested at the sources and in the distribution system. To continue to use the ••� �'�a Union River source unfiltered, the City should continue to pursue either acquisition or controlling agreements over the remaining 2% of private lands within the watershed, and should vigorously implement the Watershed Control Plan. Responsible operation of the entire water system is critical to maintaining compliance with the non-filtration status of the surface water treatment regulations. Even with these precautions, a drastic change in source quality or changes in regulations could require the City to provide filtration. Installation of UV disinfection in 2010 will further enhance Bremertori s ability to remain unfiltered. P rnn t C �1-. L,� 1� L, ,] c C �nl.,a,,,. T«,,.,�-.�.,,..�. n„1„ ..� r r b F 1+...,.,:,.1„t /rr�l\ 1; L,� +1 �- cH�@� � �St F�d�l�il� d£��}�}6� �9 F�l�A�'��te �Se 6z ar�ravivrcc�vv7 i Storage The Water Utility was analyzed using hydraulic modeling soEtware program. The evaluation completed for the �9 2005 Water System Plan indicated that the only futur� CitU of Bremerton Comprehensive Plnn City Service Appendix CS Appendix - 67 Exhibit C.2 storage deficit was in the West pressure z�A�449 �ones. This deficit will be eliminated by the construction of a�-2.5 million gallon reservoir by 2024. ' These projects are included in the CIP. Distribution System Improvements in transmission and distribution mains are necessary to improve flows and pressures in certain areas and to replace sub-standard mains. The Utility allocates funds each year to address sub-standard mains. Other larger main improvements are also listed in the CIP. Plans of Other Providers There are no other providers of potable water within the City. However, there are several nearby water districts, public utility districts and municipalities that may have interests in local surface and groundwater resources. These include: Silverdale Water District, North Perry Avenue Water District, Erland Point Water District, Sunnyslope Water District, and the City of Port Orchard. The Water Utility has service area agreements with each water system with adjacent boundaries. The Kitsc�p County Coordinated Water System Plan (CWSP), a regional water supply, transmission, and storage plan, was developed by the Water Utility Coordinating Committee (WUCC) and last updated in 2005 �� to comply with state law. The plan assesses water supply needs in Kitsap County and presents a program to provide water supply and service to users. The plan provides a process and strategy for existing water utilities to define their role in a program consistent with adopted land use policies and projected growth strategy. T�. r'�n�cn :,. Watershed planning for Water Resources Inventory Area 15 (the "2514 process") commenced in 2000. The City of Bremerton �s was one of the initiating governments for this process. The final plan �s was scheduled to be completed in 2005, but was vetoed by the Squaxin Tribe. Six-Year Financial Plan The following chart contains the funding sources, capacity projects, and non-capacity projects for the next six years. Citu of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 68 Exhibit C.2 Project 2010 2011 2012 2013 2014 2015 Watermains 415,000 1,115,000 3,175,000 2,850,000 850,000 1,000,000 Reservoirs & Dam 0 295,000 250,000 0 2,850,000 7,250,000 Pump Stations 75,000 125,000 125,000 125,000 125,000 125,000 Water Source (Weils and Surface Water) 0 140,000 100,000 125,000 250,000 575,000 Water Treatment 5,660,000 75,000 0 0 50,000 0 Water Appurtenances 165,000 365,000 365,000 560,000 290,000 290,000 Bwldmgs 720,000 885,000 900,000 0 0 0 Roads and Bndges 35,000 20,000 70,000 20,000 20,000 70,000 Land 0 135,000 0 0 0 0 Equipment 10,000 35,000 20,000 20,000 20,000 20,000 TOTAL EXPENSE 7,080,000 3,190,000 5,005,000 3,700,000 4,455,000 9,330,000 CihLof Bremerton Comprehensive Plan City Service Appendix CS Appendix - 69 Exhibit C.2 \AlATCD IICOAGTIIACAIT - �094 2�9rd �A96 �84x 289� �999 �8 2�1-'4 �eEaF �� - - - - - �al��se S9 $�2�1� $� $�� $&4��- $�� $9 $1-f�9 - �-� - - - - - �NateF-AAaµa - - - - - �� a-8�898 �A9 �89 �AA �AA �98,�988 3A4,�999 �AA ,$�899 AA+seeAa�ee�s �� �a � a-94�999 �99,98A a-9A,9A9 a-98 �9��989 a-9A �59 P�ersea-6Fee1E €�4ew-�-�Rfess�e &89 49A-88A 8 9 A 8 8 4 a-A99 �AlaEef-�'ste� �es� �9 �9 8 9 9 A 9 9 �AA9 ,4a�al-Asc}�s�+e� e�-�e�lasa�er�E AAetexs �a,999 ra9-,A99 a9 d`A-,�899 a�A-,�9A8 ra8-,989 aA �A 3�5 2� 2�-9AA �9 �&998 29 �&889 29 2A �a�AB A�p-�aF�er� ��eseast�sE�ec�- �A84-RS#4 �A�es�Ns �99 �A2� 9 8 8 A 9 9 ,a-9a8 � 5A 468 9 9 8 8 8 9 �9 ��� �9 �9 a-9 a-9,999 a-9,999 a-9 a-9 �8 �8A8 �a�a-999 �28,�88A �99 8 9 8 8 8 a-`a9a,�AAB �d-R�+r�p �EaHea-�4ew A�eEeFS 8 �A 8 9 A 8 8 8 �A-999 �asyEer�VUaEef �+s�eF +�Feve�eFlis RMas�µ �-8A9 A 9 9 9 8 9 9 7-2�989 �2�aas-�lAa�► � 8 8 A 9 A 8 9 �SA Aa�eFSeR-GFSeI� r mert rehensiv lan g g g g g g g�qgg � ���t;vi ce Append x CS Appe ix - 70 8 54 8 8 A 8 9 A �4-9As o„�.,.,.,.,. ��� � o�� � 29�999 A 8 9 A 8 9 8 �89 �e �8�9A9 8 8 9 8 8 8 8 �99;998 Exhibit C.2 �� �� e aea,�es a,eee;ees a,see e e s e �aee , ��� �,�� ,�,.,,e. ��-a�a. e aa�ees a a s g e a �a�;ees �2�-BISFUUaIe� AAa�r-R+a�te 9 8 �9 8 8 8 8 9 �6,sA9 8 2�A98 8 8 8 9 8 8 2&9A9 � Skee6#rer�-gysteK � ,4v� 9 9 9 8 �5�998 ,�--�ar9,�99 8 8 �599�A8 �w+na-�akes 9+vefsieR 9 �a,�99 8 9 9 8 8 9 �5 6eveF-feF 8 9 8 9 8 �9�A98 8 8 �9�999 8 8 �A9 8 8 8 9 9 �8 �� °,�� 8 8 A �899 8 9 9 9 $�999 �� 9 9 63 8 9 9 9 8 �999 �� � �aRs-1AFe►F 8 8 4 �9 �88 8 8 9 �a9 � {6afaya42e}�� 8 9 �&899 9 8 8 9 9 7�999 49A-�eae €�Eteps+e�e� 8 9 8 4�A99 8 8 9 9 4�998 �2='-Ma+a-- Ms1A�+lkar�as�id- 6�-fe-Ru3e-�� 8 8 8 �9A8 8 9 9 8 �AA9 9 8 8 �99 8 8 9 9 �99 �-AAaia-Baws ��r���t-6eaneste� 9 8 9 �C3-999 8 9 A 9 �r9A9 6el�Aqe�ata+a 6el�e�se 8 8 9 659 8 9 9 9 &5A�A9 �e �� 9 8 9 9 4�A98 8 8 9 41�999 �eeeare«-P1�a-4 9e�aekHea A 8 8 8 �4�994 8 8 8 34a-999 �te-Br+�A�el�#S A 8 8 9 3�.?999 8 8 9 �?999 L�sA-#9 6k�leFFaaE+ec}& 8 8 A 9 �9A9 8 9 9 �999 A0.aaeEte-�f�Qe �FU��AA4 �e �8A9 8 8 9 8 8 9 9 �9A9 �2='-BFSt-1A�ateF �-�t� 8 8 8 9 8 &4A 9 9 &49 F�ae-Rea��-AAs � WaEe�AAata 9 9 A 6 8 � 8 9 � �8�-4.99-�eae 9 8, 8 6 8 �$a-999 9 9 ��888 A 9 8 9 9 �S9;9AA 9 9 �88 Cih� o�'Bremerton Comprehensive Plan City Service Appendix CS Appendix - 71 Exhibit C.2 �� e e g s e s s s e �� s� $a-�a�es �a�a�e� �a�eea �aa�eea �?a�ees �-�eee $4�aees �a�e�as �es �+� s�s - - - - �e �ee �ea,see S�se;99s $�ee;see Sa-eee;ses Sa-eae;9ea Sa;9�e;9ee Q ��',"� �� �� �� �ee�ee �ee;eee a-ee;ees �ee;eee �ea,�ees �ee;eeg �ee;eeg �ee �ee � ��ea,ses a,aee �;aee-esa �ee;ees a,�ea,�eee �;eea,sse �;eee-ees a-eee a,5ee �-�-a�s a a-eee-eee e e g g g e a-eee � �ea,�eee e g s e a e s �ea,�ees C4�4e�Y t-��1`Y�JrP t�Otltl�tlbKY � C C C V tl C ��Cdtl-�Htltl � t°7rrt°rrr . � G 'C. /���+ ��� p �������� o^^ � ^ Ytl�'��" tl H tl tl C( '� tl t H Ytt�'L"'Vt 1"l'CM'Ct1RSV�YV� tl tl V tl tl 00�'G�O tl tf � �9E3�A�{", Q � ��� ��� ��s �� � � ,�r � Q"� 7 m='r=o'= A +v �� C`J 1 ��c�r � � � � � �/ � � � ' �F @��� ��� R@68f�F@6 � �� � �r'rd� �, r ' � � � ��� $�40 $4�9�;889 $44�888 $4�&8A9 $4�;888 $4�8888 54�9�888 $4�99g - GaqitaE�eF'�°1e-s# 8�iaa�R�aw� �/alue $�7� - - Citu of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 72 Exhibit D.1 Bremerton has a complete bicycle route network that extends through East and ■ Kitsap Way (SR-310) -11th to West Bremerton. However, most of the National (LOS D approaching LOS E) bicycle routes do not have dedicated ■ Sylvan Way - Wheaton to Petersville bicycle lanes. Lack of bicycle lanes on (LOS D approaching LOS E) designated routes is a safety problem ■ Warren Avenue (SR-303) - Callahan to not only for bicycle riders but also for Sheridan (LOS D approaching LOS E) drivers of automobiles. Exceptions to ■ Wheaton Way (SR 303) - Sheridan to this status-quo include the recently Riddell (LOS D approaching LOS E) constructed sections of SR 304, which has dedicated bicycle lanes, and Kitsap Operational, Safety, and Other Way, which has wide-shoulders which De iciencies could be made suitable for use by - - ,:, ... bicyclists. �-� - A' �� :� In 2007 the Non-Motorized � �' � �� Transportation Plan (NMTP) was 7 k � � ���� ` � �� integrated as an element of the �� _' ` � i_ � 1 Comprehensive Plan by Ordinance --_ !.___- - #5037. �x � �.* . �� ;; ��, r ,_„ � "�.. In 2009 the Commute Trip Reduction ��� —�__ _ ��` (CTR) Program was integrated as an � °����' '" � element of the Comprehensive Plan by Discussions with City staff and the Ordinance # Bremerton Citizeri s Advisory Committee identified other existing transportation Both of these plans (NMTP & CTR) system deficiencies. These deficiencies work towards the goals outlined in the include: Auto Center Way between Kitsap comprehensive plan to reduce Way and the SR-3 southbound On-Ramp; automobile traffic and increase the Loxie Eagans Blvd./Arsenal Way and 1st safety and movement of pedestrians. Street to SR 304 connections; Lower Please see full plans for details of �eaton Way between Sheridan Road and implementation and goals. Callahan Drive; Warren Avenue at 11th Street; and, the Downtown Core. Existing De f2CleytClBS The future transportation improvement plan, discussed in Chapters 4 and 5 of the Appendix, include improvements to Roadway Capacity Deficiencies address the operational deficiencies in As required by GMA, existing these areas. transportation system capacity deficiencies have been identified based on the LOS analysis described in Section 2.4 of the Transportation Appendix. The following existing roadway sections exceed or are close to exceeding this Level of Service D threshold during the PM peak hour: Cit�of Bremerton Comprehensive Plan TR-6 Transportation Element Exhibit D.2 Transportation Appendix - 2009 Update T'he current Bremerton Comprehensive Plan - Transportation Element was prepared in 2004. That plan identified a number of roadway capacity, operational and safety; transit service and facility; ferry service and facility; pedestrian and bicycle; transportation demand management; transportation system management; and traffic calming strategies, programs, improvements and projects. A significant number of these have been completed and a number of them have yet to be completed. The guiding visions, goals and objectives have not changed and will continue to guide the development of the City's transportation system until a major review and update of the Transportation Element is completed. As projects have been completed additional projects have been identified to add to the list that is consistent with the vision of the 2004 Plan. Following is a summary of the status of the major elements of the 2004 Plan and the proposed elements of the extension of the Plan. This summary forms the basis for the Six Year Transportation Improvement Plan (TIP) that guides the City and State and Federal funding agencies, in its transportation project development. Completed Projects Projects that have been completed since the 2004 Plan was adopted include: 1. SR304 Improvements from Downtown to SR3 2. SR303 Off ramp to Callahan Drive 3. Auto Center Way On ramp to SR3 4. Downtown Bremerton Transportation Center (BTC) Access Improvements - Tunnel 5. Adoption of the Bremerton Non-Motorized Transportation Plan (NMTP). Projects to be Completed and Additional Projects The following comprise the current list of projects that are in support of the vision, goals and objectives of the 2004 Plan. This list includes projects identified, but not completed due to funding limitations, as well as new projects that have funding secured or potential funding to be pursued. 1. Downtown Traffic Circulation Plan - With the completion of the BTC Access Improvements significant opportunities exist to restructure the auto/truck and non- motorized traffic flow to enhance the redevelopment of the area. This project will analyze various options that are now possible. 2. Manette Bridge Replacement - The Washington Department of Transportation is currently designing the replacement for the Manette Bridge that was originally constructed in 1929. This $83million project is totally funded by Federal Briclge Replacement Program funding, with construction starting in the spring of 2010. 3. SR303 at 11th Street Intersection - This $1.7million project improves the intersection operations and safety by extending the southbound right turn lane. Eighty six percent of the cost is provided by Federal grants. Exhibit D.2 4. Bremerton Highway/Pedestrian Safety Improvement Program - This $.9 million project improves vehicular and pedestrian safety at a number of high accident locations throughout the City and is funded fully by a Federal safety grant. 5. Wheaton Way at Schley Canyon Landslide Restoration - This project restores the culvert and roadway embankment washed out by the storm event of December 2007. Up to $500,000 has been approved for reimbursement by the Federal Highway Administration (FHWA) for this work on an 86.5 percent grant basis. 6. Pacific Avenue Improvements - The FHWA has approved an 86.5 percent grant up to $3million to reconstruct Pacific Avenue, from 6th to 11th Streets, in a pedestrian/bicycle friendly manner to foster "sustainable' redevelopment. In addition, approximately $400,000 has been made available by the State to reconstruct Pacific Avenue from Burwell to 5�. 7. City Street Pavement Preservation Program - The Bremerton Transportation Benefit District, if approved by the voters, would provide approximately $675,000 per year for repaving of City streets. 8. City Sidewalk Program - The Bremerton Transportation Benefit District, if approved by the voters, would provide approximately $225,000 per year for construction of new sidewalks. 9. Green Streets Program - Portions of 7th, 8� and 10�" Streets were identified, in the Downtown Sub Area Plan for redevelopment using "green" or sustainable design principals. These streets, as well as others, will be redeveloped as anticipated State and Federal grant funding for green/sustainable street projects become available. 10. Non-motorized Transportation Plan(NMTP) Projects - A list of bicycle and pedestrian improvement projects were identified in the NMTP. These projects will be developed as available funding sources become available. 11. Marine Drive Non-Motorized Transportation Improvements - This project was identified in the NMTP and will be constructed as resources become available. It is anticipated that planned utility work in the street corridor may provide an opportunity for this work to be completed as part of the street restoration phase of the utility work. 12. Pine Road Non-Motorized Transportation Improvements - This project was identified in the NMTP and will be constructed as resources become available. 13. Harrison District Traffic Circulation Improvements - The Harrison District Plan, adopted in 1996, identified various traffic circulation improvements for the area. These improvements will be developed as resources become available. Exhibit D.2 14. Oyster Bay Avenue Improvements - The redevelopment of the Westpark Neighborhood as Bay Vista is anticipated to create improvement needs to Oyster Bay Avenue. These improvements will be developed as resources become available. 15. Wheaton Way at Magnusson Way Intersection Improvements - The redevelopment of the Eastpark Neighborhood is anticipated to create traffic signal needs at this intersection. These improvements will be developed as resources become available. 16. Arsenal Way/Patton Avenue Safety Improvements - This project was identified in the 2004 Plan and includes curb, gutter, sidewalks, lighting, roadway widening, and intersection improvements. These improvements will be developed as resources become available. 17. Bremerton Airport Area Transportation Issues - With the annexation of the Bremerton Airport and the development of the surrounding airport environs issues will develop regarding the improvement of access to and from the Airport, including the Cross-SkIA Connector. These improvements will be developed as resources become available. 18. SR303 Transportation Corridor - T'he 2002 SR303 Corridor Study identified this as a long range major multi-modal regional corridor improvement project. These improvements will be developed as resources become available. 19. SR3/SR16 Improvements - The 2009 Bremerton Economic Development Study identified a wide range of improvements to SR3 and SR16, including improvements to the highway through the Gorst Area. This major regional project is long range in nature and will be developed as resources become available. 20. Traffic Calming Program - The 2004 Plan recommended traffic calming as an important consideration in the City's overall list of transportation activities. Interest in this topic by neighborhood groups and individuals is on the increase. A policy and a"seed" money budget should be established to assist neighborhood groups in developing appropriate traffic calming measures. Exhibit D.2 Transportation Improvement Program Summary Table Proiect 2010 2011 2012 2013 2014 2015 Downtown Traffic Circulation 25,000 � Bremerton Hi�hwaY Safety Improvement Program 940,000 SR303 at 11th Street Intersection 1,298,000 730,000 Wheaton Wax at Schley Canyon Landslide Restorahon 500,000 --- -------------- ---- ---- ----- -- ------- Pacific Ave Improvements - Burwell to 5�h 900,000 Pac�fic Ave Improvements - 5�h to ll�h 505,000 2,500,000 City Street Pavement Preservation 337,500 337,500 337,500 337,500 337,500 337,500 City Sidewalk Improvements 112,500 112,500 112,500 112,500 112,500 112,500 Green Streets Program 800,000 800,000 SR304 Navy Yard HWY Stage 1D 80,000 Pavement Condition Rating 35,000 Miscellaneous 25,000 Arterial Street Signa e 10,000 � Total � 4,768,000 � 4,480,000 � 1,250,000 � 450,000 � 450,000 � 450,000 � Exhibit E.1 Please see previously provided 2008 Stormwater Management Plan Update (On file in Council office and on Web at http://www.ci.bremerton.wa.us/displav.php?id=1039) Exhibit E.2 Stormwater The City of Bremerton (City) approved its Stormwater Management Plan in 1996. The 2008 Stormwater Management Plan (Plan) provides a guiding document for stormwater management and operational planning to meet regulatory requirements. The 2008 Plan update addresses the necessary changes due to changing Federal and State laws, permit requirements and programs, most notably the National Pollutant Discharge Elimination System (NPDES) Phase II Permit and Puget Sound Partnership's agenda. The object of the update is to describe the specific program enhancements, staffing and resources needed to meet these requirements. The Purpose of the plan update is to evaluate the present operations, staffing and capital improvements of the City's stormwater program, suggest improvements to enhance the performance of the program to meet regulatory requirements, and present an approach to fund and implement the needed improvements. Existing Conditions The City established its storm water utility pursuant to Ordinance 4454 in 1994 as codified in the Bremerton Municipal Code 15.04. The Bremerton City Council approved the City of Bremerton Stormwater Management Plan final report in 1996. Stormwater Utility rates are provided for in BMC 15.06.05. The City uses the 1992 Stormwater Management Manual for the Puget Sound Basin, published by the Washington State Department of Ecology (Ecology), and the 1997 Kitsap County Stormwater Management Manual as the technical basis for managing stormwater from new development within the City. Regulatory Requirements The NPDES permit program is designed to reduce or eliminate the discharge of pollutants to surface water. The NPDES Phase II Permit for "small" municipal separate stormwater systems was finalized by Ecology in january 2007, and issued to the City with an effective date of February 17, 2007. Minimum Control Measures The following six control measures must be implemented as part of the stormwater management program under the NPDES Phase II Permit: • Public education programs and outreach activities about the impacts of stormwater. • Public involvement/participation in the developmet, implementation and review of the stormwater program. • Program to detect and eliminate illicit discharges to the City owned strom drain system. Citu of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 50 Exhibit E.2 • Program to reduce pollutants in stormwater runoff associated with construction, new development and redevelopment projects. • Operation and maintenance (O&M) program for post construction stormwater facilities. • • Pollution prevention and good housekeeping of municipal facilities. The City is currently in compliance with NPDES requirements and timelines; however, several actions are needed in 2009 to remain consistent with permit conditions. Table ES-1 summarizes compliance requirements and schedules for those elements where action is needed. Table ES-1. Summary of Key NPDES II Permit Near Term Compliance Needs Compiiance Program Element Date Recommended Action Program compliance, implementation and Identify program organization prioritization system January-09 and action plan Update BMC technical standards, BMPs and Update BMC and adopt 2005 enforcement provisions August-09 Ecology Manual Development site inspection and verification Identify staff responsibilities program August-09 and develop database Develop maintenance program for public and pnvate facdities August-09 Develop O&M Plan Annual inspection of all permitted stormwater Develop O&M Plan and facilities including private August-09 database Staff training for IDDE Control, O&M & Develop training curriculum Pollution Prevention August-09 and implement Develop O&M Plan and Annual inspection of all stormwater facilities February-10 database Policies and procedures for reducmg pollutant Inventory facdities and needs, loadin from Cit facilities Februa -10 develo olicies Low Impact Development The City is participating, along with other Kitsap County jurisdictions, in development of technical design standards to aid in implementing low impact development (LID) techniques. These LID techniques emphasize storm water management methods that reduce impervious azeas, retain vegetation and maximize on-site infiltration. The Kitsap Home Builders Association (KHBA) is currently leading the LID standard development process, under a grant agreement with Ecology. The City intends to begin implementing LID regulations in 2009. Capital Improvement P1an CitU of Bremerton Comprehenstve Plan City Service Appendix CS Appendix - 51 Exhibit E.2 The purpose of the Capital Improvement Plan (CIP) is to identify facilities needed to improve stormwater collection, conveyance, quantity control and quality control. Projects identified for the CIP were developed from City personnel based on their experience with the system, review of previous City Stormwater Management Plans, and inspection and evaluation of existing City facilities. A total of 9 projects were evaluated as part of the CIP analysis. Each project included a description of the purpose and need, schematic design, relative priority, and planning level cost estimates for each project. Table ES-2 presents a summary of the anticipated five-year CIP. Table ES-2. Stormwater Capital Improvement Plan Project 2010 2011 2012 2013 2014 2015 City Catch Basins 20,000 20,000 20,000 20,000 20,000 20,000 Eastpark Stormwater Outfall 88,000 Shendan Conveyance 72,000 100,000 Storm Drain Replacement 185,000 100,000 550,000 100,000 100,000 100,000 Culverts 25,000 334,000 28,000 Collection Systems 16,000 16,000 148,000 LID 150,000 150,000 150,000 150,000 150,000 150,000 Total 540,000 720,000 764,000 418,000 270,000 270,000 To improve potential grant funding opportunities, it is recommended that the City develop a supplemental CIP list that consists of projects that address water quality corrective action, water quality enhancement, and/or habitat restoration needs associated with stormwater management. All of these supplemental project types fall generally within the mission of the stormwater utility. This supplemental CIP would identify potential funding sources, and would be implemented subject to receipt of applicable grant funding. This supplemental CIP should be adopted as an addendum to the SWMP so that the City can document that the projects are part of an approved plan - a criteria that is often an essential requirement for grant funding. Existing Revenues and Costs The primary source of revenue is the collection of the monthly user fee which is assessed based on an Individual Service Unit (ISU). The fee is currently $8.06 per ISU per month. Monthly user fees account for about 92 percent of revenue. Investment interest, permits, fines, and other revenues account for the remaining eight percent of the annual revenue. Total revenue in 2008 from all sources is estimated at $3,799,165, which includes a$1,787,154 carry-over fund balance. Expenditures in 2008 were $2,337,943 (excluding year end fund balance). Capital expenditures accounted for about 16 percent of the total annual expenditures during the period. Estimated Future Revenue and Costs Costs associated with the stormwater program are expected to increase slightly during the next five years in order to comply with NPDES permit requirements, as well as implement planned capital improvement projects. Cost increases are associated with additional O&M, labor, equipment and supplies, as well as administrative costs to better manage and maintain the existing systems. Between 2009 and 2013, annual costs are expected to range between approximately $3.5 million and $4.25 million. Citu of Bremerton Com�rehensive Plan City Service Appendix CS Appendix - 52 Exhibit E.2 A comprehensive outline of the Capital Facility Needs and funding are provided in the 2008 Stormwater Management Plan Llpdate, adopted by City Council Ordinance and incorporated into the Comprehensive Plan. . , , , �. • � . � � � . � � , �asi�-P4a�e �iGFes Citu of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 53 Exhibit E.2 HAYAl��'fG�� A# L�11�11MA �TAAI'�t� � � ..,.� ��..,, n„«,- Tn�.,�i..:..,.+,.,, �r.,..«,...,� k ,,..,,,,�..,..,,«,. a�, ,�;�,,,..,.�.,,,,� ..tl „ ,.F ,a,,..,......,..,a„ C«,.,.. �.L,,, � ..:a.,,.., .. ,.11,,,,�-:,... � E :,.�� .-. ,,,,� , ., 1..«,�„ .. ..�:,.,. .-. ,,,.� :., �-1�„ . .,:�-., ,-.0 r'.,11,.�., A t,,,....�, L.,.�..,,.,,.. ..�,,,. r ,�: j.,..� ..u� ��� R.,,.�.>.,11 ..,�„d 'I'I i ��te-����eue��� e� ��te €e�Fe �a��t ��e�t se�ve�������t�e�rE���k=�ee�-�,�-��se�t�= , � �n T�.,, � �te-r'� �a�se-�e�e� "�a��a��s �e� Fve�k �� ��e ���g�� e€ Wa�•�'�'�tese a�e-r���s�a�t�a�ds �b�-1�Ek a ....;.. ..,.i,,,.,,,.i t.,,-.:i:�:,.,. Cit�of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 54 Exhibit E.2 A . ., R., �2SFR �9$� i �SFF1 �FA}@6� 69S�S CitU of Bremerton Comprehensive Plan City Service Appendix CS Appendix - 55 Exhibit E.2 �n�i�- CittLof Bremerton Comprehensive Plan City Service Appendix CS Appendix - 56 Exhibit F Please see previously provided Commute Trip Reduction Plan (On file in Council office and on Web at http://www.ci.bremerton.wa.us/displav.php?id=1039) 6� 2009 Com Plan Amendments - Exhibit G � p a , I � � R � a r � � � � D� i ---- � I � j _ % F' �W ' � � � � ��—�—�--�� G � f r--� qh R � � � � i , � i � r`�.� c � 1 , ' RIDGEM�AY-Rl _ � : , ? � � i --� (; - �--�--�__ �_ ,,—�—�� � � � � o l i --�! ����. �`- ' �����- ' �' 1 1 ' `� �� � � . �p � ' � pi o ' a�; � `t �� G �FO;,:_-� � �- �l---�---! � 3 � p �� ; � � �� i O�� �� � � � � 11 � � \ o � _ `L� —� �i � E ?(���� � � � I.' '� '�� �'\ �\ V �� � "I � --,{` � � ` \ �_ � ; 0 1 � ,J� I� .� � � � '' �-� "�`< -� � ��� �� � � � �� '�\� �._�� ( � �t-AKfVIEW=D�R-; 1 �• � ti t _- _ � _ '� �\ �'\ \ � � �,�'--!-- --�---_t ��, __ �` r - - - ' � __i_1 � _ _ _ ' ' ' � f � � � \ \ �\ ��� �� \� �----� ------- - ---- ---- -1_ _ � t�� � �. � � ��__ � - -- - - - ---� � � -- � � Redesi n ' � I� --� ----_ __________ ___ _____- g ate this region �„ ; � � -�--�_ -- ----- -- ---------- outlined in black to � I �, , � � � �`�� � ___._- ------ ------ � --_ '! Limited Commercial `\��S ! 1r > > � ��. � - - -_---- -_ ,, \ i qTF � �,� �—_ �--_--_- __ _ �i ��. A� � i � �� . - - - - - - - �. � �'� -- - - - --_ - -_- - -_ - - -_ �, �� � 1 � ,-�� `' �„w'`� --_ --_ '_ _ _ -_ - - -_ -- -- � \��--_ �,, '_ �� �_� ' �l j l � ; � '� =� _ - _ � __ -_ _-__- -_ � ----__ � .:' j` �' ,� 'Y' i � �`���, - - - --� - -- - - -- � \' -�;. _ � ``�=�,.� ,%= � ' _ _� _ --___ _ - ---_ � � � _ �_ �'/ - -'`��=�'/; � - -- . ��\ - - _ _- _-__- i _ -__ - --__-_- _ _ _ -� � _ _`_��;` _ - -�� ,}'/ i \��� \\ �� _ -_ -__ � _ -__ -_ __ ___ _ _ _ ___ -_ __ _ I , '' �� y "=' ` `"� ~� � \ __ -_ \�.� -_ � -- - --- -- -------- ---- - -------- i ';, - - - �= ,�; � _ _ A �i� - _ -_ --� _ _- _ _- _- - � �;.�`i. - --. ��,.:-. "-�, =-'�, .�V _ �� � � - _ _ - -- - -- -_ __ - �� '�!_ ��.' �� - - ^ ��� /� i �. �_— —_ --- —L__— _` -.. ��,( =a'. _ ,-_t'> �/� ��i�/ ..� � --�� =,= . ^� "..� . . F' �� 4'��\ � \\��\ ' � - ,, ;�' - - ��- - ������ ��'�� �� ������ � �� �� ���� � _ ,r „'- - .,- .,-... � :Y; � , � -� � � � , ��, � : ,�,�,'� � i - _ _ _ , . , « - - � . 'r �"_ W , - ;. _ -_ �� ' y9 � / � ` I � - � . ,, - _. � - .., _ �f:_`,:- - �,.� . :� � ���' � ���� � ( � �� �9 ,_ �..,- r -_"@^r � . ".r-. � , �,r� , - �l ���Q .�� ������ �! ( �����— ,�. `.=. w - - = - ,�' � • � 9� ,�� A�V` �� 1 r---� � � �' ' ` ��� - Legend '�._ � , �--.,,, _ , � � ��� � � � i � / . \� �� ��j\�� , - qezone rarceis � umicea commareiai _ ���� a {� A�`I1/lA��. /Z � � � � � �--- _ pb �m�a �� Neiqhbomoo0 8uvness �� /� \�/ ? 1 � �.\ �� \, � � \ / � � , ( y � FutureReseneCemer � FreewavComdo� - ""�"\ / �� �� j f� �% ��'.,� ( � / l � � `� ( / � ;��� � i � iA�A ��`.—��� ,i R�� � % � Pdoptea Sub Area Plan Intluslnal _ _ / \ \ / � � i - Repwnal CentBr � Intlu9nal Park _ - '-/ � �\ 1 \\ { . \�� / � `��\ Q ��— �� � ` � ' / 1 'Q � � o�smacenre� � Ma�reme�z�ai �-° - t � � � \; � �.i �� � � ���" r � - Manufac�unng/intlustnal Cente� Higher Education � ^� � �� / ~x / ^\` � � � \ \\ � ' ?O \, i �.� \ � � �� � � n��9noomooace��e� i a ove�saa�a -``�' � ���t. /� ��. �. � t �" ;r ���� % '�� �%� � - =��,. ' -ti . =� , - - �",_ Y� i A \ / ,Q V`�� �i - - EmPloYment Center � Puget SounO Nava1 ShivYartl - - �.� / � �} 1� F * '\ � � � ,�. / _ � / \ �"_ ` �—Q � � �(��.( ' C/ \ Y � � I f ( , Low Densry ResMemial � Public Sec�or Retlevelopment 9te ' ' - � ==�,= -� ,v' � j GN Core Rentlennal - watershea - , . •"'�.: ' - / / W � � % � ":0� � � \ � R __�7 � 1 � _ _ Commerciel Gorritlor GN UtA�N �ntls - - ' ` �•� ' ' °��� ` 1 ��} � � \ / � { � � `MieaMn Wa Retlevelo �`� �� �� ' �� / , � t � i \� - u y pment Cqrntlor - T2nsportdtim, Utlltties, anU Pud�c FacAities f.� j .� ' ✓ ,," �" � r ,. `\� � � � � � _ � �� � �'f `...^ ` �. - 'c�' -: - - : —�`-� � --� '1 � t � „�,�, �~, ✓�-�l -_ j } � �I --- ��I/�/ \� .� a W�w n..nw,rosa *vrvm=�.riww.am�mmm�mmaw.�somuh�� � .. '�.�. . � y �' � I� i ' � I �\l J "_'_"' _ �_.,A..M --- ".�; " - _ _, - �,_ I I � � - - - - _ ` - - _ � `. -- _ _ , . - _ . , - . _ � � �� — r -- --��� � � I � � DRAFT FOR APPROVAL ON 11/17/09 Minutes for City of Bremerton Planning Commission Regular Meeting • September 15, 2009 I. Call to Order ,;� � �� � �� ,: T1_.td,;,,Li,s�+,b" The meeting was called to order by Chairman Wheeler at 5:30 p.mc�����"' � q ����,�,_ R. i°97-�j�'� k���j^ II. Roll Call �`�� ��h fi-t,�e��-� Y ����� �'��� '�' '� ' �E'" � , ,-� '�' ��� !d",� . Those present were: Commissioner Hoell, Commissioner��Kosusko, Commissioner Mosiman, and n3,� �.�� ���,�e�� Chairman Wheeler. Commissioners Cockburn, Kenned,y, and Streissguth were;�excused. Quorum ��� , certified. �'�';,,�'��`.,-� '����'°�;'°� � �,-.r, �,u�,�:.. �'' - ,,�,�, ,_ �• t:�-�, 41 ���5`� ,(; �lF�+'�r �'°�� ;f �;z�?`;�' � Also present: Andrea Spencer, Lindsey Sehmel and Pam�Bykonen�(DCD staf�, Mike Mecham and c '_` `�" r'.;r`��'f Larry Matel (Public Works) and Wyn Birkenthal (Parks):��,�� �;�,--�,���' �. sr r. �9�� .,���n '4 y��,�:� j "�".�� �—�`� ��.�"`., �s. i� �a' �..' � �.� w�a III. ���Approval�of �"{, �� e� �"'ffi e�'� "iT 'F�'s � ^-' •�j�� ' �� ' ti � .a�::l.`"i�C � Chairman Wheeler introduced�the agenda.�''A�motion`�w s�mad`e�.by Commissioner Kosusko and ,a:�����;,�:;�;L��:�,, ����.,�t�fi� �� ���_��� seconded by Commissioner� Mos�m,�an to appro,ve the agenda as presented. It was agreed by general consensus to approve the agend'a as presented. • ta,'i` M '4 �l�" r'�''c�u �:;,�'"� � �s � �`�,C�'�.7{yG ri.''i�y"�l� �7."��J&ji � 1-+M i �J. G ,�-��,�. �°IV:, ����Approva'l�of Minutes ��,�� ; �<� �?�r'•?'`�h����°={=�;�, � `4�i. �fiiJk��.�i' �, f�":�C�i..�_ ��,�i° �, ��^,,,�,��,�� ��R����:�� The minute`s'�'of;�the��Regul`ar�Maeting held on��August 18, 2009 were presented for approval by �,�,.,,�,�, �� ; ���.,�,�:,��. � Chairmanff �;�Wheeler'.�'��A-, motion�was made by Commissioner Kosusko and seconded by x�_c�c�.�:� `�t-�,ur�, '"''� b Commissioner Hoell to�ap�prove�the�Regular Meeting Minutes of August 18, 2009 as presented. Called��'for a vote: Commissioner�'�Hoell: Yes; Commissioner Kosusko: Yes; Commissioner °�;,��;� ��,r,� ���;� Mosiman:;�,3Yes; Chairman Wheeler: Yes. The motion carried. �.,�� �= '��,_��;�, � �° _� -u-��-� �;;. �� ��"`�;�� m��"`�` VI. Public Meeting ,� `=fi �`�'� �ctif'� a? �« A. Call To The`P,alilic�(public comments on any item not on tonight's agenda). ���� �� Chairman Wheeler asked if there were any comments from citizens. Seeing none, he closed this portion of the meeting. B. B. Public Hearin� for the 2009 Comnrehensive Plan Amendments: Chairman Wheeler opened the Public Hearing for the 2009 Comprehensive Plan Amendments. Lindsey Sehmel, City Planner, gave a presentation on six proposed Comprehensive Plan amendments: adoption of the official Comprehensive Plan land use map, update the City Services element and appendix, update the Transportation element and appendix, amend the • City Services element and appendix to include the 2008 Stormwater Management Plan, Planning Commission Meeting September 15, 2009 Page 1 of 6 DRAFT EOR APPROVAL ON 11/17/09 amend the Transportation element to include the Commute Trip Reduction Program, and a change in land use designation. • Because of the adoption of the Manette Sub-Area Plan and the annexation in the South Kitsap Industrial Area (SKIA) as well as minor cartographic changes, the official Land Use map needs to be updated to reflect the current land use within the City of Bremerton. The City Services element of the Comprehensive Plan needs to be updated to include newly adopted plans from other departments such as Water, Waste Water, and Parks. Amendments ��, ��4, to this Comprehensive Plan element would include text to incorporate the new or updated .�,� �,:�a,. plans. Each plan section will also include an updated _,�20�10=`2015 Capital Improvement Program (CIP). `'�`�'��'�"' � �'��'��,�° a ,�� i�� j4 � �� The Transportation element of the Comprehensive be updated to include text for the newly adopted Non-Motorized Transportation`��Plan, the 201�0`�2015 Transportation Improvement Program, and the Commute Trip�Reduction Program. s '�-'��' �'���, �� ���� ���:�,�;r h�n � �� ���� `���. =�'- ` ,���,_ ��.�,4 Larry Matel, Pnblic Works, Managing Engineer, ga�e�;;,an overview of�the�Stormwater Management Plan Update. The last update to`tli'�s�plan;occurred in 1996. A Com rehensive �:'' ;p -�.�:���� ��s P Plan policy gives direction for the Stormwater 1Vlanagement Plan to seek natural drainage ��'�; ""` .. i.�i{�e'��a, systems to deal with stormwatecn�(Low Impact Deve(op which this update addresses. '-Sri'y �d ��„ '�^.�`Live'"� The plan also documents existing�=conditions,�addressesl�tlie�,c�hanging regulatory environment, outlines education and public inv,o�vein'ent��ide�ntifies illegal discharges to the drainage system, and monitors stormwater impacts. Refernto�the meetirig''file for the complete updated � ��,���_��.��",�y�,� ES 1 w ti�t,' s ,n �.?:l c�C, document. ,���=i��°` rh ��;� .�:���,� °3�"e;��� �r'�i�r�.?�,�';�� �aG_�; -,`'�-" Y�_,.;'�-�' x �,� ,�;rG�;„ '�.���� �� '" � ,���;,� `-L�;��;� �_U � , , ��� �u � Mike Mecham�=,�Pablic Works';1 City Engineer, reviewed the history and requirements of the Commute Tr-`ip�Reduction (C.�T�R) program:��The intent of the program is to reduce the number of single-passenger vehicles ;�qn Wthe�road 'asn well as the number of miles traveled, thus � ..��� �r � ��,r`_vtG� �� :4�.�am� ;�',:�r`,�' reducing, pollution�and roadycongestio��Bus�nesses with 100+ employees must participate in .����_ _ � '`i°„'""'u.:�;� t� the,�CT�R��program. Awcomplete copy of the" CTR can be found in the Planning Commission "'�„ `�:`,tr uir`��r�i'^v�u.�u. '�.'-� �'..� ,�meeting file:-��,„��, ��s„� -� �,�u,�;} . ,_, ' �=_ -�c°;�" w�..e�a?. "�;„�-�""�. y � ��C�t� ��.—�'������4 '4 �i 4 � iJ.'i"��i�� {� `�ti�:,�`Amendment #6 re`lates to a`��sli'ange in land use designation from Neighborhood Business ��1�,.� � � �.� �.����� (NB) ` to Limited Com`mercial (LC) and would affect an area of approximately 6.6 acres �� �,; ;;� located�north of Kitsap�k;Way. This property was designated General Business (GB) prior to '`,� • � the 20'0�4�,� omprehens ���e Plan update and was the only site not changed from GB to LC during the� comparison chart with requirements for General Business, Neighborhood=�Business, and Limited Commercial illustrated the similarities between GB and LC and how the�N�B designation limited commercial growth in that area. Chairman Wheeler asked if there were any comments from citizens on this item. Chuck Bair, Owner "Kitsap Lake Storage", 6400 Kitsap Way: "We're a neighboring property to this land use designation change area. [Inaudible] Junction is a very vibrant area — I don't know if you go out there much, but it's anchored, of course, by Ralph's Red Apple and the Big Apple Diner. We've recently had Kitsap Lake Storage build out there; pretty extensive complex. Been a brand new insurance building built on the old Lake Shore Restaurant property and Affordable RV is now occupying, very successfully, the old fire hall • behind the Big Apple Diner. So there's a lot of activity out there so we at Kitsap Lake Planning Commission Meeting September 15, 2009 Page 2 of 6 DRAFT FOR APPROVAL ON 11/17/09 Storage, we strongly support this land use designation change to Limited Commercial. Thank you." • Mark Nesby, 6720 Kitsap Way: "Members of the Planning Commission: Thank you for this opportunity to address the commission regarding the proposed land use change from Neighborhood Business to Commercial. My name is Mark Nesby, residing at 1295 Lakehurst Drive. My wife and I have owned the Red Apple Market from 1977 until 2007 when we sold the business to Glen Correll and Russell Fernandez, both who have been working at the store since 1977. We continue to own the building and operate the $ig Apple Diner. In the 30 �,���� years we have been there, we have enlarged and remodeled se��e'ral times. We have served r � Q�,� the neighborhood and been supported by them very favorably:" The Comprehensive Plan u date done in 2005 chan ed our existin zone from .,Busiriess General to Nei hborhood P g g , �� ���,��' �-��.� �;.. g Business making almost all existing businesses on the�north�``side�,of Kitsap Way into non- conforming uses. The grocery store, at 15,000 square foot, is notaallowed in Neighborhood Business as the largest building is limited to 5.;000''�square feet. Th'e",�{Big Apple Diner, at �; i„�`��,�' + 'C�°�"�.� 3,500 square feet, is also not allowed; restaurants�'in that zone must be�no ularger than 2,500 square feet. Other businesses in the Kitsap sLake neighborhood have � issues. By �,+;., �� ��„y �`��;�; approving this rezone to Limited Commercial;�these existi`ng are pladed in a zone �S; , �ti:w ���� where they can improve and flourish. There are�i's;eueral�,Une�.w buildings and businesses such as �:�`'��,r-'�''_~,�` Kitsap Lake Storage that have �improved the "a'rea�''�and we want to encourage existing �,��,,, �^�,�a�li' businesses and those still to come,=�to'u,pgrade and tliriue:, The intent of Limited Commercial, '�� - r> '4��ciu:� as stated in the 2005 Comprehensive�"�Plan�is: `to recogn�ize:�the community's existing general � ;�n� "�'t��kCa•. - e�-�r,� commercial districts outside of designated;��boundaries �o'r�'centers on lots zoned General Business in the City, or an equivalentu designat on n�the co nty on December 1, 2004. The Limited Commercial��zorie,��is not intencled .to �be eXpanded or applied to new properties or � ,� ;��cw�'"ou+:c�`�,� _ +, ;.��. � y,_�y � areas of the city�.�� We�would� like to thaiik�Arid'rea Spencer�'and the planning staff for working � with the prope_'rty�owners to b"r�ing the existing land use in better compliance with the current i er ; 1, (c,i t�t� �N7-'�.C`t. zoning designat,ion. We enco�urage membe'r_'s�of the Commission to approve this request. On ��� G� � ��„ti� �„�;,a, behalf of the `>lancl� ownersF�;and;�busi�nesses��;in the Kitsap Lake area, thank you for your „ � n� r- �,� ;��� �T„�`=� _ �,_� � , �° �- consideration. �'�"'-�, ���-� '���'''�"'- �, '-� ��' <�.�,�� n ��. , ,�:_���� ��,- �, ��,�_����;;�,� ,,,u,,,, �t�_c�,�s�',�, ��, ��„t���;�"�.rn �t� ra�s�� "� �i��c''°�CS4i.�r,�+,4°C�''� ,�''�n' � G�l"en Corr`ell-`6724 Kitsap�Way: "I'm the owner of Ralph's Red Apple Market along with E n�, r ��� `;���ti.;i4'3,�'y'�` �"C�'3I3.�j'1" 7ni.�ri 'rny partner, Ru'ss'�Fernanclezsback there. We purchased the store almost two years ago now `'e��� ;4 , '�' e7 �2,�'-'ci,+1 ,. �;;�a'nd we ve been working there;,l Mark Nesby said, since the `70's. For our future, as the ti �� 7 � r c rent business owriees�there, and maybe someday owning the building and the land that it's ��u�;�:� ����� attached to, we would� like this land use designation changed in case, in the future, we, as "�;, ��. . ��a;� owners,,;might want some changes or extras to our business. Obviously, in this ��:,`�� �r.�m,�.n economic�time, ev,er,y,body knows that a lot of businesses are not doing well. We, luckily, are ��c°� ��� ����� ��,t� doing fairly�well±and��we would like to continue to do that. So we ask that you would approve this change so''that''in the future we can continue to do well. Thank you." Terry Lugar, 6610 Kitsap Way: "I'm the owner of Roy's Appliance Service in the Kitsap Lake area. We would also be affected by the change and we would definitely like to see it go to Limited Commercial. Our building also would be non-conforming under the current zoning so it would greatly benefit us to [inaudible] Limited CommerciaL Thank you very much." Chairman Wheeler asked if there were any additional comments from the public. Seeing none, he closed this portion of the meeting and moved on to Commission deliberation. � Planning Commission Meeting September 15, 2009 Page 3 of 6 DRAFT FOR APPROVAL ON 11/17/09 It was suggested that each amendment be discussed and voted on individually. Amendment #1: Adoption of the Official Land Use Map. • No concerns/discussion on this item. A motion was made by Commissioner Kosusko and seconded by Commissioner Hoell to recommend to City Council to adopt Amendment #1 of the 2009 Comprehensive Plan Amendments. Called for a vote. Commissioner Hoell: Yes; Commissioner Kosusko: Yes; Commissioner Mosiman: Yes; Chairman Wheeler: Yes. The motion carried. ���`. y S ..�'C�� k t�t�?�' `- �f ,uk s')' t-!` Amendment #2: Text amendments to the City Services eleme',n't:;and appendix. .�,�,�„. Commissioner Kosusko asked for clarification on what��fhe�(e�el of service would be for ^i�"�� ��` citizens under the new Parks and Open Space plan. Wyn`4�`Birkenthal, Parks & Recreation Director, explained that the Parks and Open Space�plan"can more s'pecifically lay out a level of service for neighborhood and regional parks�as �that is a calcul'able, number, but other � , ���• °ti �� preserve areas did not have an available stand'ard�as a reference of levelyof;service. Andrea n•J L Us• S7aC"�apay" �";'�yi"^� Spencer, Director of Community Development, added that what was in the' Plan update was a reference to the Parks and Open Space�plan and not the coinplete detailed � document, just as the Transportation Plan�'and� Management Plan are referenced and not included in their entirety. �������=`� e� .� .�- ��.-�.�, �� `��.�,. �nELmet7 Cil3� '4,e.s1�;h � .��. �ti�: 'Gk ��J�' 1 =A Commission Mosiman commenfed`tliat�the,�information;�on page CS-36, which explained the ��.r���. -�,�-�,;,.�,� U;;� �.� discrepancy of sewer system capac�ty�numbers�,based on info,�rmation the County and the City reported, should remain. Staff wil'1���;add updated�,text to�the document to explain the discrepancY• -��,-'':,;��,�;, ��,�� �,�,� ����r• ��,� ��� w � k a. �_ -- �°��, ei�' , -"i�; �,,:',:,��, +`;-e?� o,-�_ • a, � t h_-, ���.�y�;�,g-;,,:� ��;-��'?"..��:�.�° �;;F �';`�;�';r�"' �t;�,.�'� ��cnc�+`�,'�5�' � Referring to �,the�y,�/ater Capt,tal Improvecrient Plan (CIP), Commissioner Kosusko asked what is planned�in 2015 that=�'w�ould cost $7r,�250,000.00. Mike Mecham said it is planned to �°�-�� ��� �.,� ,��,_�,,,:� �u�u� construct two new�.�reservoir',s";=�one,�near Bremerton Airport and another in West Bremerton, to 'S+�i � y;,�T�.'..�� meet projected water�demands.�' Mosiman asked if purchasing additional ;,� ��,; '�qsa =-�,� ;�' ,r,�; Iandi�forrfheF�watershe'd;�was included in tfie��CIP• Mr. Mecham said it was. _r�"r"_i;L`_y�,'.`'Ln�,`,�:,„� '-"�:� ti,w�";���� � rt�wM�a ��'' :;.,��� 7 � `�i=�s,��' '`�,::�i> � �'�-��'�'���� �=;�`�A'�motion was made by Commissioner Mosiman and seconded by Commissioner Hoell •`�,7°� r,- �',�v,�-� ^��yx-,' t '�3��to,recommend to City Council�,to adopt Amendment #2 of the 2009 Comprehensive Plan _,,,� � , � Amendments with `�' amendment to include explanatory language to page CS-36. � °��� �-r�=�� Called�for a vote. Commissioner HoelL• Yes; Commissioner Kosusko: Yes; Commissioner 4n,�;.:� �. 'r`,�w,'i Mosiman:w,Yes; Chairnian Wheeler: Yes. The motion carried. ;�� °�� 4� ��;� �7 ��'�' � ��ti;��,� sr�'��';Y� Amendment�#3:�LTert�amendments to the Transportation Element and Appendix. �y;� ����� No concerns/d"iscussion on this item. A motion was made by Commissioner Mosiman and seconded by Commissioner Kosusko to recommend to City Council to adopt Amendment #3 of the 2009 Comprehensive Plan Amendments. Called for a vote. Commissioner Hoell: Yes; Commissioner Kosusko: Yes; Commissioner Mosiman: Yes; Chairman Wheeler: Yes. The motion carried. Amendment #4: Amend Ciry Services Element and Appendix to include the 2008 Stormwater Management Plan. • Planning Commission Meeting September 15, 2009 Page 4 of 6 DRAFT FOR APPROVAL ON l 1/17/09 Commissioner Kosusko noted he did not see a direct reference to the adopted Low Impact Development technical manual in Amendment #4. Larry Matel explained that the City Services Element contains a statement says the City will adhere to the standards of the • Western Washington Stormwater Management manuaL The Western Washington Stormwater Management manual requires the adoption the of equivalent [of LID]. Additionally, the LID technical manual has been adopted administratively by the Public Works director. Commissioner Hoell asked if any of the projects listed under Water Capital Improvements t5��`�� were eligible for stimulus money. Mr. Matel explained that�;one of the requirements for ,G-�� — �- stimulus funding of projects is to be "shovel ready" and t�he4.:�wrater projects are not ready to begin at this time. �; ��;��;� �, ;�� ,� ;}��: ����� � ��� � �,;:��, �,��� t A motion was made by Commissioner Kosusko and seconded�liy�C�ommissioner Hoell to recommend to City Council to adopt Amendmerit #4 of the 2009;Comprehensive Plan �i Y� i�'� . vt'e�:'�. Amendments. Called for a vote. Commissioner;�HoelL• Yes; Commissioner Kosusko: Yes; ..� , �-� =���,��., Commissioner Mosiman: Yes; Chairman�Wlie�;eler: Yes. The motion carried:�� ;��� '� ��� �_,�.� ,yt� : ���; aF. �.'�� {��� tCi�� m y Amendment #5: Amend the Transportation Element to;�in'c-'lude the Commute Trip Reduction -� _„� ,;,�, , � �-, ,��: � (CTR) Program. a � =��r��,�n�=�;=��' .� :�wc� -,���• No concerns/discussion on thisa�item�although Cocnmissioner Kosusko expressed pleasure ,,,.,�, �, �.i� � �-�-�°,r•�. � �?',� for moving forward with a plan tha�;�fur"thers�our city's `�e�o�,l.�ving". �,.,_ ��h_ n � „� � � t �',_.�, , �-"�';� ; �=1`:��, "'—`-"+: ���: �. . �;"��y� � ;t��s � `�'�" A motion was made by Commissioner Kosusko. and �seconded by Commissioner Mosiman to recommend�to City�w�Council��f�`to "�'adopt��.Amendment #5 of the 2009 . Comprehensive;�P a �'�Amendments: �� for a vote. Commissioner Hoell: Yes; • ~ t��n'�Y" `:= �tS'7tiL�,a � Commissioner„ryKosusko: Yes;� Mosiman: Yes; Chairman Wheeler: Yes. The motion carried�'�� '��'� �'"�"� � dt�'u�''�,��`�W�`� i ;�'�=�, � ci`n � �rcl�� � i:e_� �S?,d^�* f EL, �CiY �T.t�' �'r.. .� W,�. Amendment #6: Ch'ange�`inyL .�-��-� �� � ; _=� ��y ��:�,,�r� �:c� Becauses�'an�r,Limited�;�,Commercial zone'��cannot be located within a designated center, *3�f�i-aJ�'�'�'"`.i`�"�?�' , � �i�''� is� Commissioner=Kosusko=�was concerned that the "Reserve Center" designation would need to t,.., , ,._; �Sbe'�removed from�the proposed change site before it could be redesignated. Andrea ��� , , « "�-.�.;r � , �� �._„ ��explained that wHen�the area�,��was given a reserve center designation, it was with the �� u u=i; , � � s� ��: knowledge that the area needed� attention in the form of zoning but it could wait until the yy ��,�� �==��, 2025;�C„�,omprehensive P�an update to make those changes and the reserve centers were noted as areas�to,.look at first zwhen developing sub-area plans. In the interim, commercial activity in this north�Kitsap Way neighborhood has continued to grow and planning staff has created ,�� �n����-�,�, �,,,����, new types of;centers�that are not neighborhood centers, so a land use designation of Limited Commercial o'�uld be appropriate for this area. A motion was made by Commissioner Hoell and seconded by Commissioner Mosiman to recommend to City Council to adopt Amendment #6 of the 2009 Comprehensive Plan Amendments as defined in Attachment F. Called for a vote. Commissioner Hoell: Yes; Commissioner Kosusko: Yes; Commissioner Mosiman: Yes; Chairman Wheeler: Yes. The motion carried. , A motion was made by Commissioner Mosiman and seconded by Commissioner Hoell to recommend that City Council adopt the amendments to the Comprehensive Plan as • detailed in Attachment I, based on the Findings & Conclusions in Attachment II with Planning Commission Meeting September 15, 2009 Page 5 of 6 DRAFT FOR APPROVAL ON 11/17/09 the amendment of language on page CS-36. Called for a vote. Commissioner Hoell: Yes; Commissioner Kosusko: Yes; Commissioner Mosiman: Yes; Chairman Wheeler: Yes. The motion carried. • Chairman Wheeler closed the Public Hearing. VI. Business Meeting ti • - •�;�;;�. A. Chairman's Report: None. �� �°�=�' ��"'�'-�' ti��� B. Director's Reuort: Andrea Spencer reported that�tlie�wDepartment of Community G'����� � h��- Development has received a$200,000 grant from the; State to:conduct its Shoreline Master �f,� �;r:�. Program update. DCD has chosen Parametrix from�_a of five appl�cants as the consultant and the update is to be completed by 2012. Staff�lias been using alternate forms of public outreach such as Twitter, blogs, BKAT programs�' an information tio'otii�at the Blackberry Festival. � `"�� ���`�'' � �� � ���� �� �-��� ��;°��;,. . �-�� `�''�=��' There is continued planning on the east bridge�;l_'andingaof t(ie new Manette Bridge. WSDOT has indicated there will be room for a round-aboutawliich will open up additional park space w �-�. but the plan has not yet been forinalized. "'�����; �;;�m :��-� �,� �"���.�`°� , �. ° '�:� � ,�.. ;-`'3°t, `�°=�'a` °,,, �r� Zoning code amendments are scheduled�fo`r-��Council°`�adoption on October 21, 2009. `��w�� ,c���;.-��,� ���,�,�,, Comprehensive Plan amendments are;scheduled�Tfor�adoption;on November 4, 2009. cia*L � pii. ,� e.r,�`'�u4lH'3�v�'s3C+`.0 <y7 i��' "' "°"" `'!� ` �C'cL.�,�,'�, u�:� a�'`=�.'_�� �^'=�ii?'r��" `�"�'4u �`u �` e'l'�n±+�,�. Y-"a d��'„-� , �c�= �yx C. Old Business: Non`e�" "'" `�� "� � `�`' �-r . 3''�� ' 3 �`�"� . c�� `.. "� , u �yu ��' �a � • ;r' �_;u_ " �',.R "�i �� `; t �[tt l �.�`� ��'.�: f' ;�;�? �''��`C� D. New Busines's: �� �;°� S, -��4 t_'_-� �� n���� '���-��=. _c��.a�_ �b ,� .,�:c, 3��a ; �,,,. �v '�5'�'�° ra,, _w�,��. y ,, c, 'i a ; �wF�, u "N``o_a., 's,� �'�`a'a�`�"��.r�����'-'� �-.,a,VI'I:'�'�`-��AiC�]QUCRII]@Ilt � q �!'s;�^. ti�j�r ,, w�v�7'"' `Sa'4�E'Y6.. �-i �'�'�' a'� `�r�;�y,� s�,�;,n,�: �k'.��:+;ti���:'"^�-y��,',��a��,.F ' �i'��`"�. Meeting�,was ad�ourned at,6:53'p°�in��The next Regular Meeting is scheduled for October 20, 2009. ����� �= i���� =1°�c�c. a� ;�,_. . �:u 4�,e4 e�7> '=.�cr��s Respectfully submitted by. "`� ��°�_��_ -'r'3 �` 5. i ' '�'u �.y� �i �. n ,�''.'�` a,� � ` �;� ��`,�'_',"y�.:� �, �`i 1 ," '� � �� � `4`��,�,�� ��,�� Andrea L. Spenc"er;�Executi�e;,Secretary � ����-,-. �� a� ;; - �x,u� � � �i'��,��,,� ,���� ' �s ,Y,;�,���,� � ��� � Approved by: Greg Wheeler, Chairman • Planning Commission Meeting September 15, 2009 Page 6 of 6 ti (� AFFIDAVIT OF PUBLICATION Accotmt # 42742 AD# 254760 STATE OF WASHINGTON COUNTY OF KITSAP I, Laura Wessels, bemg first duly sworn on oath, deposes and says: That she is now, and at all times embraced m the publication herem mentioned was the principal clerk of tlle printers and publishers of KITSAP SLJN; that said newspaper has been approved as a legal newspaper by order of the Superior Court of the County of Kitsap, in wh�ch County it is published and is now and has been for more than s�x months prior to the date of the publicat�on heremafter referred to, published m the English language continually as a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County, Washmgton and is now and during all of said time, was pnnted in an office maintained in the aforesaid place of publication of said newspaper; that the following is a true text of an advertisement as it was published in regular issues (and not in supplement form) of said newspaper on the following date, to wit: A November 9, 2009 and that such newspaper was regularly distributed to its subscribers during all of said period. That the full amount of the fee charged for the foregoing publication is the sum of $60.30. This amount has not been paid in full. ���a►►��u�u�u�,,� (Signature of Principal Clerk) ����` �. S�Ty� ,,'� ti'" � '�,� Subscribed and swom to before me this day of December 3, 2009. _` '. M��,P�� � z :�i; `'~ �� _ : s�;?��IIC r f � :, �` p� �9 ��; Notary Public in and for the State of Washington, Kitsap County. ' '��,,��� j ' ���/!tlltlntt�l� e`\ ORDINANCE NO. 5094 AN ORDINANCE of the City Council of the City of Bremerton, Washington, amending the Comprehensive Plan, as follows: Amend the Land Use Map to reflect cartographic updates; update the City Services Element and Appendix integrating applicable plans previously adopted and the 2010-2015 Capital Improvement Program; update the Transportation Element and Appendix to reference the Non-Motorized Transportation Plan and inclusion of the 2010-2015 Transportation Improvement Program; amend the City Services Element and Appendix to adopt the new 2008 Stormwater Management Plan Update; amend Transportation Element to adopt die Commute Trip Reduction Program and; change land use designations for a portion of the Kitsap Lake Reserve Center from Neighborhood Business to L'united Commercial. Passed by the City Council the 4th day of November, 2009. T'he full text of this ordinance is available from the City Clerk's Office, 345 Sixth Street, Suite 600, Bremerton, WA 98337. November 9, 2009 .....................AD #20094187