Loading...
HomeMy WebLinkAbout10/21/2009 5G � DATE SUBMITTED: October 7, 2009 � AGENDA BILL ' CITY OF BREMERTON � CITY COUNCIL ■�������������������������������������������������������s�������������������e����������� SUBJECT: Grant of Utility Easement to Committee Meeting Date: October 14, 2009 Washington State Department of COUNCIL MEETING Date: October 21, �2009 Transportation (WSDOT) for an Emergency. Department: PW&U Generator Constructed at Fountain Park. Presenter: Michael Mecham Phone: 473-5288 SUMMARY: With the construction of the Downtown Pedestrian Improvements (Tunnel), an emergency generator is needed for lighting and ventilation systems connected to the tunnel. The generator was initially sited within the perimeter of the Washington State Ferry (WSF) property, but was found to be in conflict with access at the site. WSDOT requested that the generator be placed on City property at the Fountain Park, behind the Naval Museum directly beside the ramp to the Bremerton Transportation Center. \ ATTACHMENTS: L Council Summary; 2. Utility Easement FISCAL IMPACTS (Include Budgeted Amount}: None. APPROVALS: DEPARTMENT DIRECTO . � CITY ATTORNEY: FINANCE DIRECTOR: � MAYOR: J COMMITTEE CHAIR — COUNCIL PRESIDENT: �° � � CONSENT AGENDA � �- GENERAL BUSINESS ❑ ; PUBLIC HEARING ❑ RECOMMENDED MOTION: Move to approve the Utility Easement to WSDOT for Emergency Generator Constructed at Fountain Park and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COLTNCIL ACTION: [�Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action