HomeMy WebLinkAbout06/24/2009 AGENDA
FILE
CITY COUNCIL 345 6th Street, Suite 600, Bremerton, WA 98337 0 Phone (360) 473-5280
***AMENDED***
JUNE 24, 2009
CITY COUNCIL STUDY SESSION
5:00 PM - STUDY SESSION in COUNCIL CONFERENCE ROOM 603
The Study Session is open to the public but there will be no opportunities for input or participation; no
action will be taken, and the content of these items is subject to change...
A. NO DISCUSSION PLANNED - The following items are budgeted items or have been reviewed by the
appropriate Council Committee; and will be placed on the next Council Meeting Agenda for action. . .
1. Authorization for Car and Expense Allowance for Mayor Pro Tempore - Roger Lubovich, City
Attorney; and Nick Wofford, Finance Committee Chair
2. Contract Award to SOUND EXCAVATION, INC. for Construction of Lafayette 8-inch Water Main
Extension - Michael Mecham, City Engineer; and Brad Gehring, Public Works Committee Chair
3. Contract Award for Construction of 2008 Water Main Improvements at Union Avenue & Hilltop
Lane - Michael Mecham, City Engineer; and Brad Gehring, Public Works Committee Chair
Bids are scheduled to be opened on June 25, 2009...
B. FULL DISCUSSION ITEMS
1. Proposed resolution approving and authorizing a Sole Source Contract to PIPE EXPERTS, LLC for
rehabilitation of the downtown Pacific Avenue sewer lines using Trenchless Cured in Place
(CIPP) and "Inner-seal" technology Item added...
2. Real Estate Purchase and Sale Agreement with Earnest Money Provision between the City of
Bremerton and Emmanuel Apostolic Church for the Sale of Property at 807 8th Street (8th Street &
Park Avenue); and authorizing the proceeds to the Public Safety Bond Fund - Gary Sexton,
Redevelopment Projects Administrator; and Nick Wofford, Finance Committee Chair
3. Proposed resolution approving and authorizing a Sole Source Contract for purchase of individual
E-one Grinder Pump Stations for the Gorst Sewerage Project - Michael Mecham, City Engineer;
Tom Knuckey, Managing Engineer; and Brad Gehring, Public Works Committee Chair
4. Briefing on the WSDOT "Bremerton Economic Development Study" - Richard Warren, Corridor
Planning Manager, WSDOT; Phil Williams, Public Works & Utilities Director; and Michael
Mecham, City Engineer (Information only.. .Approx. 3D-minutes)
5. Purchase of Easement from Raymond Gardner, Greg Hunt, and Joan Hunt for Pump Station SB-
4 and associated Sewer Mains for the Gorst Sewerage Project - Michael Mecham, City Engineer;
Tom Knuckey, Managing Engineer; and Brad Gehring, Public Works Committee Chair
6. Proposed public hearing on a resolution to adopt a Master Plan for redevelopment and future
improvements for Lions Park - Wyn Birkenthal, Director of Parks & Recreation Department;
Colette Berna, Parks Planner, Parks & Recreation Department; and Will Maupin, Public Safety,
Parks, & Planning Committee Chair
C. GENERAL COUNCIL BUSINESS
1. Council Committee Chair Reports; and Other General Council Business (if time allows)
I Americans with Disabilities Act (ADA) accommodations provided upon request. Those requiring special accommodations
should contact the City CleTk's Office at (360) 473-5323 by noon on the Monday preceding the Council meeting.
ru// /lJ/SC-fA ss:()Y\
:Ikm. ND. 'I
Bremerton Economic Development Study
Project Status June 2009
http://www.wsdot.wa.Qov/Proiects/BremertonEcon
· We placed project information kiosks in local communities and online so you
can learn more about recommendations for transportation improvements for
SR 3, SR 16 and US 101.
· This month we will be in Bremerton, Port Orchard and Shelton to provide an
update about the study to local officials. Check out the community calendar
for details.
What is the Bremerton Economic Study?
It's a planning study where we will assess the current and future transportation
needs within the study area and provide recommendations to address short-term
and long-term safety and mobility deficiencies. We will also identify improvement
strategies that support the economic objectives within the study area, including the
South Kitsap Industrial Area (SKIA).
What areas are being studied?
The study will be conducted along SR 3 from US 101 near Shelton to Loxie Eagans
Boulevard in Bremerton; US 101 from SR 3 near Shelton to SR 102 (Dayton Airport
Road); and SR 16 from Sedgwick Road (SR 160) to SR 3 in Gorst.
Why is WSDOT studying these highways?
Presently, SR 3, US 101 and SR 16 serve growing communities in once largely rural
areas, a booming freight industry and local businesses.
Thirty percent of Kitsap County's workforce relies on these highways to commute to
work daily. Mason County has one of the highest population growth rates in the state
and is home to a growing business environment.
Also, during the summer months these highways see increased traffic due to
recreational travelers.
The End Result
We completed this study and worked with local stakeholders to identify and prioritize
projects that will help address current safety and mobility issues and support
anticipated employment and population growth in the region. The following handouts
provide additional information about the transportation improvements recommended
for Kitsap and Mason County highways.
Corridor conceptual designs upon funding
We divided the corridor into four segments to address safety and mobility issues.
The following handouts show conceptual design of each segment upon funding and
completion of the study's recommended projects.
Seament 1: US 101 from SR 102 to SR 3 and SR 3 from US 101 to Mason Lake
Road (pdf 700kb)
Seament 2: SR 3 from Mason Lake Road to Grapeview Loop Road (pdf 500kb)
Seament 3: SR 3 from Grapeview Loop Road to Lake Flora Road (pdf 600kb)
Seament 4: SR 3 from Lake Flora Road to Loxie Eagans Boulevard and SR 16 from
Gorst to Sedgwick Road (pdf 600kb)
What happens next?
Members of the stakeholders group, local representatives and agencies can use this
list to solicit and obtain funding from state and federal lawmakers to bring the
recommended projects to reality.
Project Benefits
Congestion We will assess how well people currently travel through the study area
and forecast how well they will travel through the same area in the future if no
improvements are made. This information will be used to develop recommended
improvements to make travel through the area more efficient.
Preservation We will consider projects that maintain the performance and condition
of the roadways, bridges, culverts and other highway features within the study area.
Safety We will develop recommendations that will help reduce collisions and
prevent risks to drivers for locations within the study area that have existing safety
problems. We will also forecast and develop recommendations for future safety
needs.
What is the project timeline?
The study began March 2008 and should be completed by summer 2009.
Financial Information
This study is funded through the following funding sources:
. State Funds - $500,000
. Port of Bremerton - $75,000
. Kitsap County - $75,000
. Port of Shelton - $5,000
. City of Port Orchard - $2,500
. City of Bremerton - $15,000
. Port of Allyn - $1,000
. Total Funding Available From All Sources - $673,500
To get more information, please contact:
Richard Warren, Project Manager
WSDOT Urban Planning Office
401 2nd Avenue South, Ste 300
Seattle, WA 98104
Phone: 206-464-1283
E-mail: urbanplanninq@wsdot.wa.qov
Bremerton Economic Development Study Map
1
!
,
j
..
\
)
4
1
,
I
I T.acoma"';
"--1 II 17-
\ . : ~
\ . \
'---~
. . i f
.... ~ 1
N '.r
~l
.. ! k ',.-'- ~ '., 1
F,C''''''j'"hc",,~1.: '" -___-.i.
~ ji"...':tr"....i'~.;.lC :..e- &f . -r
The study area spans 47 miles along SR 3 from US 101 near Shelton to Loxie
Eagans Boulevard in Bremerton; US 101 from SR 3 near Shelton to SR 102 (Dayton
Airport Road; and SR 16 from Sedgwick Road (SR 160) to SR 3 in Gorst.
Bremerton economic Development Study
Summer 2009
Communities shared their
experiences and ideas, we listened
Many of you visited us at an event in your community or submitted
your comments directly to WSDOT. We compiled your comments
and provided them to the project team and stakeholders group for
consideration when developing the recommended projects list.
Local participation was key
This study was a collaborative effort between WSDOT and local
agencies that resulted in a plan that addresses transportation
Issues important to the local area. The following agencies and
organizations participated in this study:
Mason and Kitsap counties
Cities of Bremerton. Port Orchard and Sheiton
Ports of Allyn. Bremerton and Shelton
Kitsap Transit and Mason County Transit
Bemerton. Shelton-Mason County and North Mason chambers
of commerce
Allyn Community Association
Kitsap Economic Development Alliance
Economic Deveiopment Council of Mason County
Funding
This study is funded through the following funding sources:
State of Washington ............................................................ $500.000
Port of Bremerton............................ ................................ ....... $75.000
Kitsap County......................................................................... $75.000
Port of Shelton ........................................................................$5.000
City of Port Orchard ................................................................$2.500
City of Bremerton ..................................................................$15.000
Port of Allyn..............................................................................$1.000
Total funding available from all sources...........................$673.500
The project team spoke with over 900 people at local events
in 2008.
For more information
Web site
www.wsdot.wa.gov/Projects/BremertonEcon
Contact
Richard Warren, Project Manager
urbanplanning@wsdol.wa.gov
WSDOT Urban Planning Office
I 401 2nd Avenue South, Suite 300
Seattle. WA 98104
206-464-1262
... Washington State
~/I Depart_ of Transportation
Americans with Disabilities Act (ADA) Information: Materials can be provided in alternative formats by contacting
WSDOT at 206-464-1262. Persons who are deaf or hard of hearing may make a request for alternative formats through the
Washington Relay Service at 7-1-1.
Title VI Notice to Public: It is the Washington State Department of Transportation's (WSDOT) policy to assure that no
person shall. on the grounds of race. color. national origin and sex. as provided by Title VI of the Civil Rights Act of 1964,
be excluded from participation in. be denied the benefits of, or be otherwise discriminated against under any of its federally
funded programs and activities. Any person who believes his/her Title VI protection has been vioiated. may file a complaint
with WSDOT's Office of Equal Opportunity (OEO). For Title VI complaint forms and advice, please contact OEO's Title VI
Coordinator at 360-705-7098.
What is the Bremerton Economic
Development StUdy?
The Bremerton Economic Development Study analyzed safety and mobility
conditions for 47 miles of highway on SR 3. SR 16 and US 101. This study
was completed in partnership between the Washington State Department of
Transportation and stakeholders in Kitsap and Mason counties.
The study has identified and developed a list of projects that will address safety and
mobility Issues along these corridors. and help support anticipated employment and
popUlation growth in the region.
Why was this study conducted?
This study assessed current and future traffic conditions along SR 3. SR 16 and
US 101 in Mason and Kitsap counties. These are main throughways for local
communities between the cities of Shelton. Bremerton and Port Orchard. Many
local residents depend on these highways for reliable trips between home and work.
Also. industries from agriculture and manufacturing to retail and tourism travei and
rely on these highways for direct access to important destinations.
As the population and economy continue to grow. it will be important to have a plan
that will address current and future transportation needs along these corridors.
....- --
N
The Bremerton Economic Development Study is a transportation planning study that spans 47 miles of
SR 3, SR 16 and US 101 between the cities of Shelton, Bremer/on and Port Orchard.
What are the 8tudy
re8ults? -
We developed a long-term vision
for the corridor and identified the
projects needed to achieve that
vision. The stakeholders group
evaluated and. ranked the projects
using criteria that included safety,
constructability. congestion,
mobility, environmental impacts
and community issues. See inside
for prioritized projects.
What happens next?
Members of the stakeholders
group, local representatives and
agencies can use this list to solicit
and obtain funding from state and
federal lawmakers to bring the
recommended projects to reality.
SA 3 between Shelton and Allyn.
Bremertlln Economic Development Study
Summer 2009
Transportation improvements recommended for Kitsap and Mason
County highways
LEGEND
Bremertlln Economic Development Study
- Maintain existing roadway, install pedl
non-motorized improvements
- Proposed limited access freeway
- Proposed 4.lane highway
-- Proposed 2.lane highway
. Proposed intersection improvements
o Proposed interchange improvements
/:9 \
I'
,.o/f/."..<
r.::~7''f' -
_f~'
)F
l '
f 1/
J
J
.c'
"
h
',\ '\"
~
v
,r'
Other related projects
-- Belfalf AIea Wid&ning & Safely Project
"". BetfairBypass
$ Programmed intersection improvements
'\, I
~-"'3"{ ;'
Mason County j:
I'
i'
'If '"11,
,;.
/ I'
~i
/,,-..J[
'-"\ \' <: ,
"-=.-' ~:/-[~..
I,
fi !
/7 I:
/...~-'
Ii
'I
1i
if
...../'
.',
Segment 4
....;,
/:;-;,.r
,.:;>'
<;..
/:.~-':';"-
~.:.-...:.......
.;:::.:..r'
This map is an overview of major improvements recommended for each segment of the corridor between the cities of Shelton, Bremerton and Port Orchard.
Traffic and safety analysis
We divided the study area into four segments to look at traffic and safety issues,
Traffic
We assessed how well people currently travel through the study area and
forecasted how well they will travel through the same area in the future during
afternoon peak hours (4 to 6 p.m.),
Level of service indicates how well an intersection functions during peak hours
and is graded (A-F), Scores of 0 or better are considered acceptable. Highway
speeds are considered acceptable if at or above 70 percent of the posted speed
during peak hours.
Over the next 20 years, as the population and economy in the area continues to
grow, the number of Intersections and roadways that can effectively serve peak
hour traffic will decline if no investments are made to the corridors.
2008 2020 (with no 2030 (with no
Improvements) Improvements)
Intersections with level of 5 22 26
service below 0
Intersections with level of 24 7 3
service better than 0
Miles of roadway below 70% 12.5 25.8 35,5
of posted speed
Miles of roadway above 70% 34,6 21.3 11.6
of posted speed
Safety
Between January 1, 2004 and December 31,2008 there were 2,194 collisions and
24 fatalttles along the study's corridors. Of these, 159 collisions and four fatalities
were alcohol and I or drug related.
Collisions by type
2,194 tot'"
Fatalities by segment
24 total
.-
'~W~dll1'l.1.."'on
hMj'l'lC ~....~ W. n.
'"
Prioritized Projects
Top three
1. Bellair Bypass
2, SR 3 and Johns Prairie Road
intersection
3. Gorst area improvements
Next ten
(all under $5 million)
4. SR 3 and Imperial Way
Intersection"
4. SR 3/ Bellair additional
non-motorized improvements
(including a bike lane, sidewalk
and closed drainage system)"
6. SR 3 and East North Bay Road
Intersection
7. SR 3 and East Lakeland Drive
I Evans Street intersection
8. US 101, northbound ramp at
Wallace-Kneeland Boulevard
intersection
9. SR 3 and Sunnyslope RQad
intersection
1 O. SR 3 and Christopherson
Road intersection (interim
Improvements)"
1 O. SR 3 and Christopherson
Road intersection (2020
Improvements)"
1 O. SR 3 and Pickering Road
intersection"
13. US 101 and SR 102
intersection
Intersection improvements could
include updating or adding
roundabouts, traffic signals,
and I or channelization, See
complete report for details.
See project Web stte for complete
project list.
"Projects with the same number
scored the same using the
prioritization criteria.
Bremerton Econom ic
Development Study
Richard Warren
Corridor Planning Manager
Urban Planning Office
Paula Hammond
Secretary of Transportation
Dave Dye
Deputy Secretary
Steve Reinmuth
Chief of Staff
Bremerton City Council
June 24, 2009
~
:J: Washington State
". Department of Transportation
~
== Washington State
YII Department of Transportation
Bremerton Economic Development Study
Presentation Overview
· Study goals and objectives
· Backg rou nd
· Safety analysis
· Traffic volumes
· Traffic conditions
· Summary of improvement projects
· Segment 4 Cross Sections
· Gorst Concept
· Prioritized projects
· Public outreach
· Next steps
2
~
::7: Washington State
"II Department of Transportation
Bremerton Economic Development Study
Study Goals and Objectives
· Identify and prioritize transportation
improvements needed over the next 10 to 20
years to support and enhance safety, mobility
and economic development
· Identify and prioritize transportation
improvements that could be implemented as
funding becomes available
· Work with local jurisdictions and the Tribes
· Engage citizens and underrepresented
populations
· Develop broad-based support of final
recommendations
3
Driving south on SR 16 from Gorst
Gorst Interchange
Background
Origin:
July 7, 2004 Port of Bremerton Transportation
and Economic Development Summit for SKIA
Issues:
Congestion, safety, economic development,
lack of transit and non-motorized facilities
Schedule:
Spring 2008 - Summer 2009
Funding:
Various parties = $675,500
Stakeholders:
Cities, counties, transit agencies, ports,
chambers of commerce, economic
development commissions
4
''-f~';J( '''i\ " "\V""",' -"A"
, j,~~~\ \ .,,~~fE~Xj
1 )l' , ' '.<J\~",,'~)(t1
(h~~) '1; \ '-<'l;tf~~::~l'"'
~\ 1'., '., t...~,r.;",,,!,Ai'#:
0~~ I~J ,~""!;J~:?I"";;;)
~., !.~ r"...." ~., A.",.' ,...1
~t:\>>;) ,::;~~:'t~:,: ~?:~.
Btemerton~;,~;~~"~ ~~;\
~'>P~rt O~{~~~~&i~~'il
@J#t>!(":'..<'~'Vl~
16 (~:< ~i~t,
f;I' ~""'-<,,,,~,,~\
I : @6 ;:~1 t~;:~
." "". h;". ",,.,.',,
....r:,.-I,,:;(!Y,~" '.f<....A- _ _;.,- "'~G;'l;lt- 'i:':~~.1";;;"
''''~W./- .', r " I . k-- -,'.' '~~ ',. ,- .
~....~~~' . j\"~ ~:.'\l ~.~ t"{~
~I.;,J.o : ~<~ ,,....,.~t ~;,~)~~ 1t~~~>,t<lng 9
Allyn --f-<.l ;fl,~:~.ii".\ l.l 5:',}' ".~;':::
J~'~",~- ,A!r~;;i/"' :\' ltl f~~Ar;~i~~
3 ' ~J . h.'(.~,:'''' ,:;tyi~&.,., ,,~~~ ~ :'i,'
/,~,~f'~~t~~J; ~ t!Th~r{" L \\~;~~~:~ti~i~~:t:~
w ,(.:tf:."I . 'k",,:,,';',(JT:''r'', . \. 1.,'<'" If <";!'>~""~''''
~ :'t~:-'~)(' : -"'~t:~ei~;' .~L'JJ.~ '~~(.?:';"$~' ifi/J "v'r~-/ "
11'" .f.)!. ,~."..,~.1 . (dp c 1',;";';")" ""'. "\ .?.{.l\....4 ~
S t:to=n If t::,:~\ ..,. 'I;/::'jl \ ~
"- \ : 1'. '..\" ":-" :t/.~~,. ))' 'i;,~~: ~"'~ S,:"J i4'~ '
'..'7' .~~_~...t~..._<.."':'~}}lj,... ......;l. \.J}# \,~"Ii.,".n,.,~....": I
. ,:.., ..,~~,- "'~..' 1'f: ":J...., ~~. J~
\. . ;P"~-i;!' ,) .,. ,~",.', -,,-~ ci;: '/
. I. 'I ,.-1\ <.t~,,<.~ ~"".,, ,\/
'. . I.i~... ~".' .' '~\ I',' -\'" t ~"'. ~ !I {-'
,..,~.~..,-\../:....- . /f<~~ # }oJ sJ ~;..~(l {$.;' ~r-<.'t ~.:;r' t ";.I".jo~.i - ~;
. "i;., ........ ,\ IJ1t t };<.A a.
:'" (;1 l~:~~,\t \:,. 1 ~ ~/~;\;~/ ~~#~ ~~." ~-
. '.:t" t'r~"''<;. ",~".;oJ\ rJ~ ..$" !
. f ,,<.' ~\\ \ ';',.~:~:fs;~~~," /,/
-:::: ..::. > ",z0;"~ifl I r'~:/'" 1
- - - - -~~~. ;_~' ,~J
l:1'y"W!>': Kitsap County
t{~1 ;>/
..;{4" ,~
JfU"#
~r\1'
Jd!: _ _ _ _
f~~
_ J,"'i,
., fl"J
~1 riftl
j~:l""
,'!x. ;
~~ l:.t: 1
!'~ I
ii~' _
(;.{i, .t'~'j:'t'~'"
Jl~~,'~~' (l~"~ .~~:~ .,;
I ,,< <, or"~ '1~'"
t ......,~,~
.~
o
Study Limits:
-SR 3: US 101 to Loxie Eagans Blvd
-SR 16: Sedgwick Rd (SR 160) to SR 3
-SR 101: SR 3 to SR 102 (Dayton Airport Rd)
~
:7: Washington State
Y/I Department of Transportation
Bremerton Economic Development Study
Safety Analysis
January 1, 2004 - December 31, 2008
2, 194 collisions
24 fatalities
159 collisions and 4 fatalities were alcohol and / or drug related
Pedestrian
T' h'l 1%
urOlng ve Ie e Head-on
Entering-at-angle 3% 1%
7%
Collisions by type
Fatalities by segment
5
.....
::7: Washington State
Y/I Department of Transportation
Bremerton Economic Development Study
Traffic Volumes
29 intersections analyzed
Average volumes (2006*):
-Shelton: 11,000 - 17,000
-Allyn: 6,700 - 9,800
-Selfair: 13,000 - 17,000
-Sremerton: 44,000 - 73,000
Projected average volumes (2030):
-Shelton: 20,000 - 27,000
-Allyn: 18,000 - 23,000
-Selfair: 26,000 - 39,000
- Sremerton: 58,000 - 100,000
*based on 2006 WSDOT Annual Traffic Report
6
LEGEND
i>f'., ,;{.":i:,,<~
j;1J--'i,"~'!.: '. ~'''''~~.::..
r;IJi~~:~"';"
t./,'.,,~"'~1i;j
~.~~ij7; ...: ~:~:~J
:~,:;,7"V Kltsnp County
..J
.i~..t
c/~
- Study Route
="'" Belfair Area Widening &
Safety Project
· · .. Belfair Bypass
o Traffic Count Locations
'] 1;'" "',
< 41?i?
t ,b;;::7"
" {fit
'~J"4~~1
~'-,>"~
J'l...;
If
16'~;:"~
~l"i": '~J
...,
).
~ McEW3n Prairie RdJ
~ Mason lake Rd
~.,'
I~ ~
} >
l:
~.~:
~
::7: Washington State
"II Department of Transportation
Bremerton Economic Development Study
Traffic Analysis
Existing Conditions - 2008
AI1"~'" .~, it"""
d;~':;::"
~ "',;~JL ~J
;(.{Z':<r....:j
i' ,~~ :;:;,,1
'; ,!5",..;-.r KltS8p County
ji
LEGEND
-= Travel speed >85% of
posted speed
- Travel speed between 70%
and 85% of posted speed
- Travel speed <70% of
posted speed
- Belfair Area Widening &
Safety Project
. · .. Belfair Bypass
. Intersection LOS A or B
Intersection LOS C or D
. Intersection LOS E or F
Note' Trevo! speed refers 10 PM peak hour
travel speed on the roadway sogmerlt
/
7
lp,Y, q': fyr
~~:fr::-' :;t
t;,~i,
;f;,;:f;;": KltGap County
:)f
',';)
LEGEND
,;.'k~'''r
';.~
t: -I . ;1 l
)-'
Allyn
'"""" Travel speed >85% of
posted speed
- Travel speed between 70%
and 85% of posted speed
- Travel speed <70% of
posted speed
- Belfair Area Widening &
Safety Project
· · .. Belfair Bypass
. Intersection LOS A or B
Intersection LOS C or D
. Intersection LOS E or F
Note: Travol speed rerers to PM peak hOur
travet speed on the roadway sogment
. ""'-I'
S
"
SR102 \
,@~-.
L-Ts~~,;;r"I~
):
~:'~
'"'" """l '" ~
i,~~f'
''':\' - ~
,,'
J
.,'
i'
Thurston County
.#!tf-~
~
:7: Washington State
"/I Department of Transportation
Bremerton Economic Development Study
Traffic Analysis (continued)
LEGEND
""""" Travel speed >85% of
posted speed
- Travel speed between 70%
and 85% of posted speed
- Travel speed <70% of
posted speed
- Belfair Area Widening &
Safety Project
· . .. Belfair Bypass
. Intersection LOSAor B
Intersection LOS C or D
. Intersection LOS E or F
NOla' Travel sp&ed rerers 10 PM peak hour
travel speed on the roadway segment
, "'.../
8
'-..,.
SR1021
J~-'.
I,. ~ ,_~ .~"~~;:rel~
8
II'-!.:~ ", ~'." j,'/
I"'~~'*.' ,- ~
1'(~;-~~~: ;)~"'< ,
.,,;
.j;.~,j,:i-l'..'t" Kltsnp County
~rr
Belfulr :: lltk. Flor. Rd
SR 106 ~....:
..~,~ .~~81l1f;llrBYPu$
~:';y' : $R 30l
f~f:;:;~ ~ :...North 81Y Rd
~.-.&L~ ~~'Y '! - _
~lYimliI~1 :tt: llkelind ~d
;.0-
-\;;;
l.
i:{i-
\~~
0"
"~i';
.,'),yt,
~
::7: Washington State
"II Department of Transportation
Bremerton Economic Development Study
Summary of transportation improvements
Projects:
-28 short-term projects
-17 long-term projects
Prioritization process:
-WSDOT project team evaluated
projects based on:
Safety
Constructability
Congestion I mobility
Environmental impact
-Stakeholders evaluated projects
based on
Community issues
9
LEGEND
Bremerton Economic Development Study
- Maintain existing roadway, install pedl
non-motorized improvements
..... Proposed limited access freeway
- Proposed 4-lane highway
= Proposed 2-lane highway
. Proposed intersection improvements
o Proposed interchange improvements
Other related projects
= Belfair Area Widening & Safety Project
..... Belfair Bypass
CD Programmed intersection improvements
Mason County
\ b
'I:~NV"'~~~:;'~'
.r
I; I
i(1=~
",,#'
.,ft-"
, ~
~(.,f' [\
d:t" ~
..,r,,,,~i<"':' ~
~
~ Washington State
"/I Department of Transportation
Bremerton Economic Development Study
Long-term vision for Segment 4
.
SR 3 north of Belfair to Gorst
"
'\
Shoulder Travel
Lane
Travel Shoulder Shoulder Travel
Lane Lane
conceptual design
Travel Shoulder
Lane
)
'\
.'
· Eight-foot inside and outside shoulders with rumble strips, as needed
· Left-turns allowed at intersections
· Access improvements
· North Belfair to Imperial Way: Divided highway with two 12-foot lanes in each
direction
· Imperial Way to Gorst: Divided highway with three 12-foot lanes in each direction
(not shown)
10
~
:J: Washington State
"II Department of Transportation
Bremerton Economic Development Study
Long-term vision for Segment 4
SR 3 from Gorst to Loxie Eagans Boulevard and SR 16 Limited-access
freeway section
Shoulder
Shoulder Shoulder HOV
Travel
Lane
~
conceptual design
· Three 12-foot travel lanes in each direction
· One 12-foot HOV lane in each direction
· Ten-foot inside and outside shoulders with rumble strips, as needed
11
~
:7: Washington State
Y/I Department of Transportation
Bremerton Economic Development Study
Long-term vision for Segment 4
SR 3 I SR 16 Interchange - Gorst concept
· Four-lane overspan crossing at SR 3 /
Christopherson Intersection
· Channelization improvements for SR 3/
Christopherson Intersection
· Rebuild SR 3 and SR 16 ramps
conceptual design
12
~
::7: Washington State
"II Department of Transportation
Bremerton Economic Development Study
Top three projects
13
Belfair Bypass - Construct alternate 2-lane divided highway around Belfair; design will include 4-lanes with limited access
but initially built to 2 lanes; access points at approximately one mile intervals; right of way acquired for 4-lane design
SR 3 I Johns Prairie Road - Intersection improvements; relocate intersection to the south, improve intersection angle and
add new roadwa link
Garst Area Improvements - Widen all roadways through Gorst area to 6 lanes plus HOV lanes; grade separate Sam
Christo herson Road / SR 3 intersection
Refer to Belfair
Bypass report
$18.5
Needs further study
~
::7: Washington State
~II Department of Transportation
Bremerton Economic Development Study
Prioritization of short and mid-range (2020) projects
SR 3 /Imperial Way - Intersection improvements; add additional channelization improvements
SR 3 Belfair Additional Non-motorized Improvements - Widen existing 2-lane roadway to include a bike lane and
sidewalk in each direction, and a closed drainage system.
SR 3/ North Bay Road - Intersection improvements; install roundabout or traffic signal based on detailed traffic study and
warrants
SR 3/ Lakeland Drive / Evans Street - Intersection improvements; install traffic signal based on detailed traffic study and
warrants
US 101 NB Ramps / Wallace Kneeland Blvd. - Intersection improvements; install traffic signal or roundabout based on
detailed traffic study and warrants
SR 3/ Sunnyslope Road -Intersection improvements; install roundabout or traffic signal based on detailed traffic study and
warrants
SR 3/ Sam Christopherson Road -Interim improvements to meet 2008 demand: add extra left turn lanes from Sam
Christopherson Road to SR 3, add right turn lane from SR 3 to Sam Christopherson Road, limit other access points to right-
in / right-out
SR 3 / Sam Christopherson Road - 2020 intersection improvements and rechannelization: in addition to the interim
improvements, add one through lane in each direction on SR 3 approaches, add a double left turn and a separate right turn
from the SR 16 spur to SR 3
SR 3/ Pickering Road - Intersection improvements; install roundabout or traffic signal based on detailed traffic study and
warrants
US 101/ SR 102 - Intersection improvements; install roundabout or traffic signal based on detailed traffic study and warrants
$2.6
$1.9
$1.9
$1.9
$1.7
$1.8
$3.3
$1.4
$1.3
14
~
:7: Washington State
Y/I Department of Transportation
Bremerton Economic Development Study
Prioritization of short and mid-range (2020) projects
15
SR 3 / Agate Road - Intersection improvements; install roundabout or traffic signal based on detailed traffic study and
warrants
SR 3/ Mason lake Road - Intersection improvements; install roundabout or traffic signal based on detailed traffic study and
warrants
US 101 NB Ramps / Shelton-Matlock Road - Intersection improvements; install roundabout or traffic signal, based on
detailed traffic study and warrants
SR 3 Widening - Widen to 4 lanes from Imperial Way to Sunnyslope Road
New County Road and Improved SR 3 Intersection - Install new connector roadways to combine traffic from Cranberry
Creek Road, Deer Creek Road and Agate Road; install roundabout or traffic signal at common point for traffic movements
with SR 3, limit access at other locations to right-in / right-out (project replaces SR 3/ Agate Road and SR 3 / Cranberry
Creek Road projects)
SR 16 Ramps / Tremont Street - Widen Tremont Street to 4 lanes, install new signals at both ramp interchanges
SR 3 Allyn Non-motorized Improvements - Install sidewalks within Allyn business zone
SR 3 Widening - Widen to 4 lanes
SR 3 / Grapeview loop Road - Intersection improvements; install roundabout or traffic signal based on detailed traffic study
and warrants
SR 16 Ramps / Sedgwick Road - Widen Sedgwick Road to 4 lanes plus turn lanes
SR 3 / Cranberry Creek Road - Intersection improvements; install roundabout or traffic signal based on detailed traffic study
and warrants
US 101 SB Ramps / Shelton-Matlock Road - Intersection improvements; install new southbound off-ramp; install traffic
signal or roundabout based on detailed traffic study and warrants
SR 3 Widening - Extend SR 3 lane over SR 16 north for longer merge area (interim)
$1.4
$1.9
$1.4
$38.2
$8.5
$15.7
$5.8
$34.8
$1.8
$15.1
$1.9
$2.8
$16.1
~
:J:: Washington State
YII Department of Transportation
Bremerton Economic Development Study
Prioritization of short and mid-range (2020) projects
SR 3 Widening - Widen to 6 lanes plus HOV lanes from Gorst Spur to SR 304
SR 16 Widening - Widen to 6 lanes from Sedgwick Road interchange to Gorst
US 101 Widening - Widen to 4 lanes; improvements for Matlock Road interchange; limited-access freeway section
US 101 Widening - Widen to 4 lanes; limited-access freeway section
SR 3 Safety Improvements - Widen shoulders, install southbound left turn lane at South Grapeview Loop Road, install
northbound right turn lane at North Grapeview Loop Road
$129.8
Belfair Area Safety and Widening Improvements - Widen existing 2-lane roadway to 3-lane roadway (including two-way
left turn lane) with bike lane and sidewalk in each direction, and a closed drainage system
$18.6
16
~
::z: Washington State
"/I Department of Transportation
Bremerton Economic Development Study
Long-range projects - beyond 2020
,~V~~f :!p'~';'~~~~i~(;.,
i~Mi ,".~~.rrn~~
us 101 Widening - Widen to 4 lanes from SR 102 to Wallace Kneeland Boulevard
SR 3 Widening - Widen to 4 lanes from US 101 to south city limits
SR 3 Widening - Widen to 4 lanes from South of Johns Prairie Road to Mason Lake Road
SR 3 Widening - Widen to 4 lanes from Mason Lake Road to Pickering Road
SR 3 1 Mason Benson Road - Intersection improvements; install roundabout, traffic signal, and / or additional channelization based on detailed
traffic study and warrants
SR 3 Improvements (Grapeview Loop Road to Belfair) - further study needed to investigate traffic flows through Allyn area
SR 3 Widening - Widen to 4 lanes from Lake Flora Road to Imperial Way
SR 3 1 Imperial Way - Intersection improvements; additional channelization or grade separation is needed to meet level of service standards
SR 3 Widening - Widen to 6 lanes from Imperial Way to Sunnyslope Road as divided highway, restrict access to right-in / right-out
SR 3 Widening - Widen to 6 lanes from Sunnyslope Road to Gorst as divided highway, restrict access to right-in / right-out
SR 3 Widening - Widen to 8 lanes plus HOV lanes from Gorst to SR 304
SR 31 SR 16 Interchange - Reconstruct interchange
SR 3 1 SR 304 Interchange - Reconstruct interchange
SR 3 Widening -Install northbound drop lane from SR 304 to Loxie Eagans interchange
17
~
::z: Washington State
"/I Department of Transportation
Bremerton Economic Development Study
Public Outreach
Activities:
-Project Web site:
www.wsdot.wa.gov/Projects/BremertonEcon/default.htm
-Online comment form
-Posters / materials at community locations
-Fairs and festivals (938 visitors)
What we heard:
- Build the Belfair Bypass
-Widen and install turn lanes, passing lanes, and
signals
- Fix the Gorst bottleneck
-Provide bike and pedestrian facilities
-Fix Johns Prairie Road / SR 3 intersection
- Provide more and better coordinated transit
service
18
Taste of Hood Canal, Belfair- August 2008
Bremerton Blackberry Festival - September 2008
~
:J: Washington State
"II Department of Transportation
Bremerton Economic Development Study
Next steps
· Continue agency briefings
· Stakeholders review draft plan document
· Project kiosks with folios and fact sheets available to the public
· Prepare and release final study document