Loading...
HomeMy WebLinkAbout5070 ORDINANCE NO. 5070 AN ORDINANCE of the City Council of the City of Bremerton, Washington amending Appendix A of Section 15.06.015 of the Bremerton Municipal Code relating to assessments, rates, fees, and charges for municipal water, wastewater, and stormwater services establishing new rates for all categories to implement a 5.8% CPI increase in water, wastewater, and stormwater charges. And further implementing a 2.2% increase in General Facilities according to the Seattle Construction Index. WHEREAS, the City Council desires to amend the rates, fees, and charges set forth in Appendix A of Section 15.06.015 of the Bremerton Municipal Code to implement the consumer price index increase pursuant to BM C 15.06.0 15 (b); and < WHEREAS, the City Council desires to increase General Facilities charges using the Seattle Construction Index in accordance with BMC 15.06.015(b); NOW THEREFORE THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. Appendix A of Section 15.06.015 ofthe Bremerton Municipal Code is hereby amended to read as stated in Exhibit A attached hereto, and incorporated herein by reference, establishing new rates for all categories for 2009. SECTION 2. Section 1 of this Ordinance shall be effective January 1, 2009. The rates currently in effect as set forth in Appendix A of Section 15.06.015 on the date of adoption of this Ordinance shall remain in effect until January 1, 2009. SECTION 3. Severabilitv. If anyone or more sections, subsections, or sentences of this Ordinance are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Ordinance and the same shall remain in full force and effect. SECTION 4. Effective Date. This Ordinance shall take effect and be in force ten (10) days from and after its passage, approval, and publication as provided by law. PASSED by the City Council the I ~ 2009 Utility Rates Approved this e2~ day of ATTEST: TO FORM: #~~ PUBLlSHEDthe~) dayof ~ ',22000088 EFFECTIVE the ~ day of ~_ _ ORDINANCE NO. SO 70 R:\Legal\Legal\Ordinances\Public Works & Utilities\2009 Rate Ordinance.doc 2009 Utility Rates Appendix A ASSESSMENTS, RATES, FEES, AND CHARGES EFFECTIVE JANUARY 1, 2998 JANUARY 1, 2009 Within City Limits Outside City Limits GENERAL FACILITY CHARGES Water (per Meter Size) 5/8" x 3/4" 1" 1 1/2" 2" Greater than 2" $ 2,157.00 $ 2,511.00 $ 2,157.00 $ 2,511.00 $ 6,111.00 $ 6,276.00 $ 6,141.00 $ 6,276.00 $ 12,284.00 $ 12,554.00 $ 12,281.00 $ 12,554.00 $ 19,652.00 $ 20,084.00 $ 19,652.00 $ 20,084.00 Calculated based on usage Calculated based on usage $ 3,719.00 $ 3,801.00 $ 3,719.00 $ 3,801.00 $ 997.00 $ 1,019.00 N/A N/A Wastewater (per ERU) Storm water (per ISU) CONNECTION/INSPECTION FEES Water Connection Fees 5/8" x 3/4" 1" 11/2" 2" Greater than 2" Wastewater Connection Fees Lateral Connection at PIL Lateral Connection at Main Conveyance Facility Ext. (per Foot) but not less than: Pump Station Miscellaneous (per hour) $ 1,850.00 $ 1,957.00 $ 2,775.00 $ 2,935.50 $ 1,993.00 $ 2,109.00 $ 2,989.50 $ 3,163.50 $ 3,127.00 $ 3,308.00 $ 1,690.50 $ 4,962.00 $ 3,971.00 $ 4,201.00 $ 5,956.50 $ 6,301.50 Actual Time & Materials 150% of Actual Time & Materials $ 1.19 $ 1.26 $ 1.79 $ 1.89 $ 112.00 $ 468.00 $ 663.00 $ 702.00 $ 583.00 $ 617.00 $ 875.00 $ 926.00 $ 19.00 $ 52.00 $ 71.00 $ 78.00 $ 19.00 $ 52.00 $ 71.00 $ 60.00 $ 291.00 $ 308.00 $ 137.00 $ 354.00 $ 1.61 $ 1.70 $ 2.12 $ 1.96 $ 351.00 $ 371.00 $ 527.00 $ 427.00 $ 583.00 $ 617.00 $ 875.00 $ 710.00 $ 19.00 $ 52.00 $ 71.00 $ 60.00 Field Inspection Fees Water main extensions (per foot) but not less than: Pump Station Miscellaneous (per hour) 1 of 8 Within Outside City Limits City Limits RETAIL WATER SERVICE RATES General Service - Monthly Service Charge Meter Size 5/8 x 3/4 inches $ 9.95 $ 10.53 $ 11.93 $ 15.80 1 inch $ 11.37 $ 12.03 $ 17.06 $ 18.05 1 1/2 inch $ 16.16 $ 17.10 $ 21.21 $ 25.65 2 inch $ 21.71 $ 22.97 $ 32.57 $ 34.46 3 inch $ 11.19 $ 43.58 $ 61.79 $ 65.37 4 inch $ 71.00 $ 81. 00 $ 116.00 $ 122.00 6 inch $ 272.00 $ 288.00 $ 10&.00 $ 432.00 8 inch $ 991.00 $ 1,052.00 $ 1,191.00 $ 1,578.00 10 inch $ 3,516.00 $ 3,752.00 $ 5,319.00 $ 5,628.00 12 inch $ 13,332.00 $ 14,105.00 $ 19,998.00 $ 21,158.00 Residential Commodity Charge (per HCF) 0- 10 HCFIMonth $ 1.0& $ 1.14 $ 1.62 $ 1.71 Over 10 HCFIMonth $ 1.21 $ 1.28 $ 1.82 $ 1.92 Non - Residential Commodity Charge (per HCF) $ 1.17 $ 1.24 $ 1.76 $ 1.86 Fire Protection - Monthly Service Charge Service Size 1 inch $ 16.95 $ 17.93 $ 25.13 $ 26.90 1 1/2 inch $ 25.51 $ 26.99 $ 38.27 $ 40.49 2 inch $ 33.17 $ 35.09 $ 49.76 $ 52.64 3 inch $ 36.55 $ 38.67 $ 51.83 $ 58.01 4 inch $ 39.81 $ 42.15 $ 59.76 $ 63.23 6 inch $ 19.72 $ 52.60 $ 71.58 $ 78.90 8 inch $ 66.18 $ 70.02 $ 99.27 $ 105.03 10 inch $ 93.00 $ 98.00 $ 140.00 $ 147.00 12 inch $ 132.00 $ 140.00 $ 198.00 $ 210.00 Commodity Charge (per HCF) $ 2.33 $ 2.48 $ 3.50 $ 3.72 - For Usage Other Than Firefighting Low-Income Senior and Low-Income Disabled Citizen - Monthly Service Charge Base Charge (per account) $ 9.95 $ 10.53 $ 11.93 $ 15.80 Commodity Charge 0- 5 HCFIMonth No Charge No Charge 5 - 10 HCFIMonth $ 1.08 $ 1.14 $ 1.62 $ 1.71 Over 10 HCFIMonth $ 1.21 $ 1.28 $ 1.82 $ 1.92 Temporary/Construction Meter 1" Meter Deposit $ 150.00 $ 150.00 Base Fee (per month) $ 11.37 $ 12.03 $ 17.06 $ 18.05 Set Up Fee $ 106.00 $ 106.00 Hydrant meter (3" Meter) Deposit $ 1,000.00 $ 1,000.00 Base Fee (per month) $ 41.19 $ 43.58 $ 61.79 $ 65.37 Set Up Fee $ 106.00 $ 106.00 Equipment LosslDamage Actual Time & Materials 150% of Actual Time & Materials Commodity Charge (per HCF) $ 1.17 $ 1.24 $ 1.76 $ 1.86 2 of 8 RETAIL WATER SERVICE RATES (cont'd) City Parks and Recreation Dept. - Irrigation Commodity Charge (per RCF) $ 3 of 8 Within City Limits 0.59 $ Outside City Limits 0.62 Within Outside City Limits City Limits RETAIL WASTEWATER SERVICE RATES Monthly Service Charge Sillgle Family Base Charge (per account) $ 29.55 $ 31.26 $ 33.98 $ 35.95 Commodity Charge (per RCF) $ 3.96 $ 4.19 $ 1.55 $ 4.82 Duplex on 1 Meter or 2 Bldgs on 1 Meter Base Charge (per unit) $ 23.40 $ 24.76 $ 26.91 $ 28.47 Commodity Charge (per RCF) $ 3.96 $ 4.19 $ 1.55 $ 4.82 Multi - Family Base Charge (per unit) $ 23.10 $ 24.76 $ 26.91 $ 28.47 Commodity Charge (per RCF) $ 3.96 $ 4.19 $ 1.55 $ 4.82 Commercial I Base Charge (per account) $ 13.6& $ 46.21 $ 50.23 $ 53.14 Commodity Charge (per RCF) $ 1.0& $ 4.32 $ 1.69 $ 4.97 Commercial II Base Charge (per account) $ 11.13 $ 47.01 $ 51.09 $ 54.06 Commodity Charge (per RCF) $ 6.39 $ 6.76 $ 7.35 $ 7.77 Commercial III Base Charge (per account) $ 11.00 $ 46.55 $ 50.60 $ 53.53 Commodity Charge (per RCF) $ 5.23 $ 5.53 $ 6.01 $ 6.36 Low-Income Senior and Low-Income Disabled Citizen Base Charge (per account) $ 1&.33 $ 19.39 $ 21.0& $ 22.30 Commodity Charge (per RCF) 0- 5 RCF/Month No charge No charge Over 5 RCF /Month $ 3.96 $ 4.19 $ 1.55 $ 4.82 Septage Disposal (per gallon of tank capacity) $ 0.22 $ 0.23 $ 0.22 $ 0.23 Leachate Per Gallon of Tank Capacity $ 0.10 $ 0.11 $ 0.10 $ 0.11 4 of 8 RETAIL STORMWATER RATES Monthly Service Charge Residential I (Single FamilyiDuplex) Base Charge (per account) Exception: Duplex with 2 Meters (per account) Residential II Base Charge (per ISU) + 50% of the Base Charge Residential III Base Charge (per ISU) + 100% of the Base Charge Commercial I Base Charge (per ISU) Commercial II Base Charge (per ISU) + 50% of the Base Charge Commercial III Base Charge (per ISU) + 100% of the Base Charge Public School Districts (per account) Low-Income Senior and Low-Income Disabled Citizen Base Charge (per account) Multi - Family & Commercial Rate Adjustment Water Quality (per ISU) Water Quantity (per ISU) Storm water Penalty New Multi - Family & Commercial development without on-site detention Charge (per ISU) Within City Limits Outside City Limits $ 8.03 $ 8.50 N/A $ 4.05 $ 4.28 N/A $ 12.05 $ 12.75 N/A $ 16.06 $ 17.00 N/A $ 8.03 $ 8.50 N/A $ 12.05 $ 12.75 N/A $ 16.06 $ 17.00 N/A $ 8.03 $ 8.50 N/A $ 4.91 $ 5.19 N/A $ 0.89 $ 0.94 N/A $ 2.68 $ 2.84 N/A $ 1. 79 $ 1.89 N/A IlVIPROPER STORJ\<lW"A~TER INFLOW RA~TES The following rates arc established for Improper Storm water Inflow, based upon the stormv.'ater ISU fDr each lot and adjusted annually on tho following schedule: EFFECTIVE n,A~TE May 1, 2002 May 1, 2003 May 1, 2002 May 1, 2003 May 1, 2001 May 1, 2005 RAn;. 25% Storm7iater Fee for Property 50% Storm water Fee for Property 25% Storm7iator Fee for Property 50~<' Storm?iater Fcc for Property 75% Storm water Fcc for Property 100% Storm water Fcc for Property }dler May 1, 2005, tho Improper Stormwater 10001'.' Rate will remain at 100% of the Stormwater Fee for a property unless otherwise modified by tho City Council. The fees shall be deposited in tho Wastewater Fund (151 ). 5 of 8 MISCELLANEOUS FEES AND CHARGES Park Reservation Fee (non-refundable) Office Services New Account (includes water turn-on) Account Maintenance Past Due Notice Lien Recovery Charge Close AccounVMeter Kead/Water ~eIVlce 1 Uffi- off Field Services Pavement Restoration Charge (refundable, if assessed and not required) Asphalt Patch Concrete Patch Asphalt Trench Concrete Trench County Road Permit Within City Limits Outside City Limits $ 30.00 $ 30.00 $ 20.00 $ 20.00 $ 5.00 $ 5.00 $ 2.50 $ 2.50 $ 100.00 $ 100.00 $ 20.00 $ 20.00 $ 694.00 $ 1,041.00 $ 894.00 $ 1,341.00 $ 817.00 $ 1,225.50 $ 2,348.00 $ 3,522.00 N/A Cost Wet Tapping (Water Main Only)* 8" and smaller - excl excavation & backfill $ 2,376.00 $ 2,514.00 $ 3,564.00 $ 3,771.00 8" and smaller - service to property line $ 5,056.00 $ 5,349.00 $ 7,581.00 $ 8,023.50 Greater than 8" x 8" Actual Time & Materials 150% of Actual Time & Materials *Does Not Include Pavement Restoration Charge Fire Hydrant Installation* 8" x 6" and smaller - service to property line Greater than 8" x 6" Water Meter Reinstallation 3/4" & 1" 1-112" & 2" 3" and greater Water Meter Reactivation Water Meter Tampering Tampering Removal Tampering Reinstallation Cross-Connection Control Inspection Fire Service - Detector, Meter & MXU Storz Adapter $ 6,118.00 $ 6,505.00 $ 9,222.00 $ 9,757.50 Actual Time & Materials 150% of Actual Time & Materials $ 78.00 $ $ 125.00 $ Actual Time & Materials $ 78.00 $ $ 125.00 $ Actual Time & Materials 83.00 132.00 83.00 132.00 $ 50.00 $ 50.00 $ 191.00 $ 200.00 $ 191.00 $ 200.00 Actual Time & Materials Actual Time & Materials $ 50.00 $ 50.00 $ 112.00 $ 436.00 $ 112.00 $ 436.00 $ 233.00 $ 247.00 $ 233.00 $ 247.00 6 of 8 Within City Limits Outside City Limits MISCELLANEOUS (cont'd) Water Service Tum-offrrum-on (Customer Request) Regular Hours After Hours $ $ 20.00 175.00 $ $ 20.00 175.00 Delinquency Notice $ 10.00 $ 10.00 Water Service Tum-offrrum-on (Delinquent Accounts) Regular Hours After Hours $ $ 50.00 175.00 $ $ 50.00 175.00 Flow and Pressure Test (Uncertified) 3/4" & 1" meters only 1-1/2" & 2" meters only Larger than 2" $ 50.00 $ 90.00 Actual Time & Materials $ 50.00 $ 90.00 Actual Time & Materials Utility Plant Locates Regular Hours After Hours Emergency N/C $ 1&1.00 $ N/C 191.00 N/C $ 181.00 $ N/C 191.00 Meter Test Fee (based on meter size) 3/4" & 1" 1-1/2" & 2" 3" or greater $ 125.00 $ $ 172.00 $ Actual Time & Materials 132.00 182.00 $ 125.00 $ $ 172.00 $ Actual Time & Materials 132.00 182.00 Engineering Services* Plan Check Fees Main Extensions: per foot BUT not less than (Includes hydrants and appurtenances and connection to water system) Pump Stations Fireline Extension Irrigation Systems System Connections Miscellaneous (per hour) $ $ 0.27 $ 231.00 $ 0.29 244.00 $ $ 0.41 $ 347.00 $ 0.44 366.00 $ 579.00 $ 613.00 $ 869.06 $ 920.00 $ 93.00 $ 98.00 $ 110.00 $ 147.00 $ 93.00 $ 98.00 $ 110.00 $ 147.00 $ 93.00 $ 98.00 $ 110.00 $ 147.00 $ 19.00 $ 52.00 $ 71.00 $ 78.00 * Fees include original review and one resubmittal review. Additional reviews will be charged at miscellaneous hourly rate (above). 7 of 8 Within City Limits Outside City Limits MISCELLANEOUS (cont'd) Storm Drainage Plan Review Fees ** Prelimillary Drainage Plans Residential Development Non-Residential Development Plus per ISU Final Detailed Drainage Plans Residential Development (per lot) o - 20 Lots 21 - 50 Lots 51 - 100 Lots 100+ Lots Minimum Charge Non-Residential Development per ISU Minimum Charge Resubmittal Fees First Resubmittal Subsequent Resubmittal $ $ $ 358.00 $ 218.00 $ 10.78 $ 379.00 262.00 11.41 N/A N/A Storm Drainage Inspection Fees ** Residential Development (per lot) Non-Residential Development (per ISU) Minimum Charge Conveyance Facility Extensions (per foot) Minimum Charge Unscheduled Inspections* (per site visit) $ 38.&2 $ 41.07 N/A $ 28.01 $ 29.67 N/A $ 2U1 $ 26.25 N/A $ 21.57 $ 22.82 N/A $ 275.00 $ 291.00 N/A $ 21.57 $ 22.82 N/A $ 330.00 $ 349.00 N/A No Charge N/A $ 275.00 $ 291.00 N/A $ 16.18 $ 17.12 N/A $ 16.18 $ 17.12 N/A $ 165.00 $ 175.00 N/A $ 0.86 $ 0.91 N/A $ 330.00 $ 349.00 N/A $ 19.00 $ 52.00 N/A *(Unscheduled inspections shall be tracked through the course of a project and billed after the [mal site inspection. Fees for unscheduled inspections shall be paid prior to [mal occupancy approval.) ** Does not apply to single family residence or duplex construction on an existing established lot. Utility/Lien Search Fee (Manual)*** $ 30.00 $ 30.00 ***Search per parcel 8 of 8 AFFIDAVIT OF PUBLICATION Account # 42742 / Ad # 242034 ST ATE OF WASHINGTON COUNTY OF KITSAP I, Laura Wessels, being first duly swom on oath, deposes and says: That she is now, and at all times embraced in the publication herein mentioned was the principal clerk of the printers and publishers of KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court of the County of Kitsap, in which County it is published and is now and has been for more than six months prior to the date of the publication hereinafter referred to, published in the English language continually as a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County, Washington and is now and during all of said time, was printed in an office maintained in the aforesaid place of publication of said newspaper; that the following is a true text of a legal advertisement as it was published in regular issues (and not in supplement form) of said newspaper on the following date, to wit: November 26, 2008 and that such newspaper was regularly distributed to its subscribers during all of said period. That the full amount of the fee charged for the foregoing publication is the sum of$40.38. The ","ounl hos not been p,id in fulL ~C?...~ ~ (Signature of Principal Clerk) Subscribed and swom to before me this day of December 2,2008. ~~"i...~c ~~~,~ J, MOA~~~> ,.. "-~v alt ~v I 1 0 ',:\;8IUI'; ;. /'.A , 0;,.;: · ....... ""\".0' "" (:"- ,~- It(,~, .. % Ii' 0 , '" 'c.r 01 1.\ '1\. (,{ CI) : ~ ' ./y /J,.. 1J '.,. -~ ""-.-1 '(I ...... I:J/ P":)' \C' . ~.A ~QI 7,~.}~:..)\.....'.... .- )7~ ,,' () '." "c). ?- /<<' .. -(;!. _\J~" ",-0 0;.: ''vVAS~\\-\G ___..$,r Notary Public in and for the State of Washington, Kits ORDINANCE NO. 5070 AN ORDINANCE of the City Council of the City of Bremerton, Washington, amending Appendix A of Section 15.06.015 of the Bremerton Municipal Code relating to assessments, rates, fees, and charges for municipal water, wastewater, and stormwater services establishing new rates for all categories to implement a 5.8% CPI increase in water, wastewater, and stormwater charges. And further implementing a 2.2% increase in General Facilities according to the Seattle Construction Index. PASSED by the City Council the 19th day of November, 2008. The full text of this ordinance is available from the City Clerk's Office, 345 Sixth Street, Suite 600, Bremerton, W A 98337. November 26, 2008...................AD #20080302