HomeMy WebLinkAbout5070
ORDINANCE NO. 5070
AN ORDINANCE of the City Council of the City of
Bremerton, Washington amending Appendix A of Section
15.06.015 of the Bremerton Municipal Code relating to
assessments, rates, fees, and charges for municipal water,
wastewater, and stormwater services establishing new rates for all
categories to implement a 5.8% CPI increase in water, wastewater,
and stormwater charges. And further implementing a 2.2%
increase in General Facilities according to the Seattle Construction
Index.
WHEREAS, the City Council desires to amend the rates, fees, and charges set
forth in Appendix A of Section 15.06.015 of the Bremerton Municipal Code to implement the
consumer price index increase pursuant to BM C 15.06.0 15 (b); and
< WHEREAS, the City Council desires to increase General Facilities charges using
the Seattle Construction Index in accordance with BMC 15.06.015(b); NOW THEREFORE
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON DOES
HEREBY ORDAIN AS FOLLOWS:
SECTION 1. Appendix A of Section 15.06.015 ofthe Bremerton Municipal
Code is hereby amended to read as stated in Exhibit A attached hereto, and incorporated herein
by reference, establishing new rates for all categories for 2009.
SECTION 2. Section 1 of this Ordinance shall be effective January 1, 2009. The
rates currently in effect as set forth in Appendix A of Section 15.06.015 on the date of adoption
of this Ordinance shall remain in effect until January 1, 2009.
SECTION 3. Severabilitv. If anyone or more sections, subsections, or sentences
of this Ordinance are held to be unconstitutional or invalid, such decision shall not affect the
validity of the remaining portion of this Ordinance and the same shall remain in full force and
effect.
SECTION 4. Effective Date. This Ordinance shall take effect and be in force ten
(10) days from and after its passage, approval, and publication as provided by law.
PASSED by the City Council the I ~
2009 Utility Rates
Approved this e2~ day of
ATTEST:
TO FORM:
#~~
PUBLlSHEDthe~) dayof ~ ',22000088
EFFECTIVE the ~ day of ~_ _
ORDINANCE NO. SO 70
R:\Legal\Legal\Ordinances\Public Works & Utilities\2009 Rate Ordinance.doc
2009 Utility Rates
Appendix A
ASSESSMENTS, RATES, FEES, AND CHARGES
EFFECTIVE JANUARY 1, 2998 JANUARY 1, 2009
Within
City Limits
Outside
City Limits
GENERAL FACILITY CHARGES
Water (per Meter Size)
5/8" x 3/4"
1"
1 1/2"
2"
Greater than 2"
$ 2,157.00 $ 2,511.00 $ 2,157.00 $ 2,511.00
$ 6,111.00 $ 6,276.00 $ 6,141.00 $ 6,276.00
$ 12,284.00 $ 12,554.00 $ 12,281.00 $ 12,554.00
$ 19,652.00 $ 20,084.00 $ 19,652.00 $ 20,084.00
Calculated based on usage Calculated based on usage
$ 3,719.00 $ 3,801.00 $ 3,719.00 $ 3,801.00
$ 997.00 $ 1,019.00 N/A N/A
Wastewater (per ERU)
Storm water (per ISU)
CONNECTION/INSPECTION FEES
Water Connection Fees
5/8" x 3/4"
1"
11/2"
2"
Greater than 2"
Wastewater Connection Fees
Lateral Connection at PIL
Lateral Connection at Main
Conveyance Facility Ext. (per Foot)
but not less than:
Pump Station
Miscellaneous (per hour)
$ 1,850.00 $ 1,957.00 $ 2,775.00 $ 2,935.50
$ 1,993.00 $ 2,109.00 $ 2,989.50 $ 3,163.50
$ 3,127.00 $ 3,308.00 $ 1,690.50 $ 4,962.00
$ 3,971.00 $ 4,201.00 $ 5,956.50 $ 6,301.50
Actual Time & Materials 150% of Actual Time & Materials
$ 1.19 $ 1.26 $ 1.79 $ 1.89
$ 112.00 $ 468.00 $ 663.00 $ 702.00
$ 583.00 $ 617.00 $ 875.00 $ 926.00
$ 19.00 $ 52.00 $ 71.00 $ 78.00
$ 19.00 $ 52.00 $ 71.00 $ 60.00
$ 291.00 $ 308.00 $ 137.00 $ 354.00
$ 1.61 $ 1.70 $ 2.12 $ 1.96
$ 351.00 $ 371.00 $ 527.00 $ 427.00
$ 583.00 $ 617.00 $ 875.00 $ 710.00
$ 19.00 $ 52.00 $ 71.00 $ 60.00
Field Inspection Fees
Water main extensions (per foot)
but not less than:
Pump Station
Miscellaneous (per hour)
1 of 8
Within Outside
City Limits City Limits
RETAIL WATER SERVICE RATES
General Service - Monthly Service Charge
Meter Size
5/8 x 3/4 inches $ 9.95 $ 10.53 $ 11.93 $ 15.80
1 inch $ 11.37 $ 12.03 $ 17.06 $ 18.05
1 1/2 inch $ 16.16 $ 17.10 $ 21.21 $ 25.65
2 inch $ 21.71 $ 22.97 $ 32.57 $ 34.46
3 inch $ 11.19 $ 43.58 $ 61.79 $ 65.37
4 inch $ 71.00 $ 81. 00 $ 116.00 $ 122.00
6 inch $ 272.00 $ 288.00 $ 10&.00 $ 432.00
8 inch $ 991.00 $ 1,052.00 $ 1,191.00 $ 1,578.00
10 inch $ 3,516.00 $ 3,752.00 $ 5,319.00 $ 5,628.00
12 inch $ 13,332.00 $ 14,105.00 $ 19,998.00 $ 21,158.00
Residential Commodity Charge (per HCF)
0- 10 HCFIMonth $ 1.0& $ 1.14 $ 1.62 $ 1.71
Over 10 HCFIMonth $ 1.21 $ 1.28 $ 1.82 $ 1.92
Non - Residential Commodity Charge (per HCF) $ 1.17 $ 1.24 $ 1.76 $ 1.86
Fire Protection - Monthly Service Charge
Service Size
1 inch $ 16.95 $ 17.93 $ 25.13 $ 26.90
1 1/2 inch $ 25.51 $ 26.99 $ 38.27 $ 40.49
2 inch $ 33.17 $ 35.09 $ 49.76 $ 52.64
3 inch $ 36.55 $ 38.67 $ 51.83 $ 58.01
4 inch $ 39.81 $ 42.15 $ 59.76 $ 63.23
6 inch $ 19.72 $ 52.60 $ 71.58 $ 78.90
8 inch $ 66.18 $ 70.02 $ 99.27 $ 105.03
10 inch $ 93.00 $ 98.00 $ 140.00 $ 147.00
12 inch $ 132.00 $ 140.00 $ 198.00 $ 210.00
Commodity Charge (per HCF) $ 2.33 $ 2.48 $ 3.50 $ 3.72
- For Usage Other Than Firefighting
Low-Income Senior and Low-Income Disabled Citizen - Monthly Service Charge
Base Charge (per account) $ 9.95 $ 10.53 $ 11.93 $ 15.80
Commodity Charge
0- 5 HCFIMonth No Charge No Charge
5 - 10 HCFIMonth $ 1.08 $ 1.14 $ 1.62 $ 1.71
Over 10 HCFIMonth $ 1.21 $ 1.28 $ 1.82 $ 1.92
Temporary/Construction Meter
1" Meter
Deposit $ 150.00 $ 150.00
Base Fee (per month) $ 11.37 $ 12.03 $ 17.06 $ 18.05
Set Up Fee $ 106.00 $ 106.00
Hydrant meter (3" Meter)
Deposit $ 1,000.00 $ 1,000.00
Base Fee (per month) $ 41.19 $ 43.58 $ 61.79 $ 65.37
Set Up Fee $ 106.00 $ 106.00
Equipment LosslDamage Actual Time & Materials 150% of Actual Time & Materials
Commodity Charge (per HCF) $ 1.17 $ 1.24 $ 1.76 $ 1.86
2 of 8
RETAIL WATER SERVICE RATES (cont'd)
City Parks and Recreation Dept. - Irrigation
Commodity Charge (per RCF)
$
3 of 8
Within
City Limits
0.59 $
Outside
City Limits
0.62
Within Outside
City Limits City Limits
RETAIL WASTEWATER SERVICE RATES
Monthly Service Charge
Sillgle Family
Base Charge (per account) $ 29.55 $ 31.26 $ 33.98 $ 35.95
Commodity Charge (per RCF) $ 3.96 $ 4.19 $ 1.55 $ 4.82
Duplex on 1 Meter or 2 Bldgs on 1 Meter
Base Charge (per unit) $ 23.40 $ 24.76 $ 26.91 $ 28.47
Commodity Charge (per RCF) $ 3.96 $ 4.19 $ 1.55 $ 4.82
Multi - Family
Base Charge (per unit) $ 23.10 $ 24.76 $ 26.91 $ 28.47
Commodity Charge (per RCF) $ 3.96 $ 4.19 $ 1.55 $ 4.82
Commercial I
Base Charge (per account) $ 13.6& $ 46.21 $ 50.23 $ 53.14
Commodity Charge (per RCF) $ 1.0& $ 4.32 $ 1.69 $ 4.97
Commercial II
Base Charge (per account) $ 11.13 $ 47.01 $ 51.09 $ 54.06
Commodity Charge (per RCF) $ 6.39 $ 6.76 $ 7.35 $ 7.77
Commercial III
Base Charge (per account) $ 11.00 $ 46.55 $ 50.60 $ 53.53
Commodity Charge (per RCF) $ 5.23 $ 5.53 $ 6.01 $ 6.36
Low-Income Senior and Low-Income Disabled Citizen
Base Charge (per account) $ 1&.33 $ 19.39 $ 21.0& $ 22.30
Commodity Charge (per RCF)
0- 5 RCF/Month No charge No charge
Over 5 RCF /Month $ 3.96 $ 4.19 $ 1.55 $ 4.82
Septage Disposal (per gallon of tank capacity) $ 0.22 $ 0.23 $ 0.22 $ 0.23
Leachate Per Gallon of Tank Capacity $ 0.10 $ 0.11 $ 0.10 $ 0.11
4 of 8
RETAIL STORMWATER RATES
Monthly Service Charge
Residential I (Single FamilyiDuplex)
Base Charge (per account)
Exception: Duplex
with 2 Meters (per account)
Residential II
Base Charge (per ISU) + 50% of the Base Charge
Residential III
Base Charge (per ISU) + 100% of the Base Charge
Commercial I
Base Charge (per ISU)
Commercial II
Base Charge (per ISU) + 50% of the Base Charge
Commercial III
Base Charge (per ISU) + 100% of the Base Charge
Public School Districts (per account)
Low-Income Senior and Low-Income Disabled Citizen
Base Charge (per account)
Multi - Family & Commercial Rate Adjustment
Water Quality (per ISU)
Water Quantity (per ISU)
Storm water Penalty
New Multi - Family & Commercial
development without on-site detention
Charge (per ISU)
Within
City Limits
Outside
City Limits
$ 8.03 $ 8.50 N/A
$ 4.05 $ 4.28 N/A
$ 12.05 $ 12.75 N/A
$ 16.06 $ 17.00 N/A
$ 8.03 $ 8.50 N/A
$ 12.05 $ 12.75 N/A
$ 16.06 $ 17.00 N/A
$ 8.03 $ 8.50 N/A
$ 4.91 $ 5.19 N/A
$ 0.89 $ 0.94 N/A
$ 2.68 $ 2.84 N/A
$
1. 79 $
1.89
N/A
IlVIPROPER STORJ\<lW"A~TER INFLOW RA~TES
The following rates arc established for Improper Storm water Inflow, based upon the stormv.'ater ISU
fDr each lot and adjusted annually on tho following schedule:
EFFECTIVE n,A~TE
May 1, 2002
May 1, 2003
May 1, 2002
May 1, 2003
May 1, 2001
May 1, 2005
RAn;.
25% Storm7iater Fee for Property
50% Storm water Fee for Property
25% Storm7iator Fee for Property
50~<' Storm?iater Fcc for Property
75% Storm water Fcc for Property
100% Storm water Fcc for Property
}dler May 1, 2005, tho Improper Stormwater 10001'.' Rate will remain at 100% of the Stormwater Fee for a property
unless otherwise modified by tho City Council. The fees shall be deposited in tho Wastewater Fund (151 ).
5 of 8
MISCELLANEOUS FEES AND CHARGES
Park Reservation Fee
(non-refundable)
Office Services
New Account (includes water turn-on)
Account Maintenance
Past Due Notice
Lien Recovery Charge
Close AccounVMeter Kead/Water ~eIVlce 1 Uffi-
off
Field Services
Pavement Restoration Charge
(refundable, if assessed and not required)
Asphalt Patch
Concrete Patch
Asphalt Trench
Concrete Trench
County Road Permit
Within
City Limits
Outside
City Limits
$
30.00
$
30.00
$ 20.00 $ 20.00
$ 5.00 $ 5.00
$ 2.50 $ 2.50
$ 100.00 $ 100.00
$ 20.00 $ 20.00
$ 694.00 $ 1,041.00
$ 894.00 $ 1,341.00
$ 817.00 $ 1,225.50
$ 2,348.00 $ 3,522.00
N/A Cost
Wet Tapping (Water Main Only)*
8" and smaller - excl excavation & backfill $ 2,376.00 $ 2,514.00 $ 3,564.00 $ 3,771.00
8" and smaller - service to property line $ 5,056.00 $ 5,349.00 $ 7,581.00 $ 8,023.50
Greater than 8" x 8" Actual Time & Materials 150% of Actual Time & Materials
*Does Not Include Pavement Restoration Charge
Fire Hydrant Installation*
8" x 6" and smaller - service to property line
Greater than 8" x 6"
Water Meter Reinstallation
3/4" & 1"
1-112" & 2"
3" and greater
Water Meter Reactivation
Water Meter Tampering
Tampering Removal
Tampering Reinstallation
Cross-Connection Control
Inspection
Fire Service - Detector, Meter & MXU
Storz Adapter
$ 6,118.00 $ 6,505.00 $ 9,222.00 $ 9,757.50
Actual Time & Materials 150% of Actual Time & Materials
$ 78.00 $
$ 125.00 $
Actual Time & Materials
$ 78.00 $
$ 125.00 $
Actual Time & Materials
83.00
132.00
83.00
132.00
$
50.00
$
50.00
$ 191.00 $ 200.00 $ 191.00 $ 200.00
Actual Time & Materials Actual Time & Materials
$ 50.00 $ 50.00
$ 112.00 $ 436.00 $ 112.00 $ 436.00
$ 233.00 $ 247.00 $ 233.00 $ 247.00
6 of 8
Within
City Limits
Outside
City Limits
MISCELLANEOUS (cont'd)
Water Service Tum-offrrum-on
(Customer Request)
Regular Hours
After Hours
$
$
20.00
175.00
$
$
20.00
175.00
Delinquency Notice
$
10.00
$
10.00
Water Service Tum-offrrum-on
(Delinquent Accounts)
Regular Hours
After Hours
$
$
50.00
175.00
$
$
50.00
175.00
Flow and Pressure Test (Uncertified)
3/4" & 1" meters only
1-1/2" & 2" meters only
Larger than 2"
$ 50.00
$ 90.00
Actual Time & Materials
$ 50.00
$ 90.00
Actual Time & Materials
Utility Plant Locates
Regular Hours
After Hours
Emergency
N/C
$ 1&1.00 $
N/C
191.00
N/C
$ 181.00 $
N/C
191.00
Meter Test Fee (based on meter size)
3/4" & 1"
1-1/2" & 2"
3" or greater
$ 125.00 $
$ 172.00 $
Actual Time & Materials
132.00
182.00
$ 125.00 $
$ 172.00 $
Actual Time & Materials
132.00
182.00
Engineering Services*
Plan Check Fees
Main Extensions: per foot
BUT not less than
(Includes hydrants and appurtenances
and connection to water system)
Pump Stations
Fireline Extension
Irrigation Systems
System Connections
Miscellaneous (per hour)
$
$
0.27 $
231.00 $
0.29
244.00
$
$
0.41 $
347.00 $
0.44
366.00
$ 579.00 $ 613.00 $ 869.06 $ 920.00
$ 93.00 $ 98.00 $ 110.00 $ 147.00
$ 93.00 $ 98.00 $ 110.00 $ 147.00
$ 93.00 $ 98.00 $ 110.00 $ 147.00
$ 19.00 $ 52.00 $ 71.00 $ 78.00
* Fees include original review and one resubmittal review.
Additional reviews will be charged at miscellaneous hourly rate (above).
7 of 8
Within
City Limits
Outside
City Limits
MISCELLANEOUS (cont'd)
Storm Drainage Plan Review Fees **
Prelimillary Drainage Plans
Residential Development
Non-Residential Development
Plus per ISU
Final Detailed Drainage Plans
Residential Development (per lot)
o - 20 Lots
21 - 50 Lots
51 - 100 Lots
100+ Lots
Minimum Charge
Non-Residential Development
per ISU
Minimum Charge
Resubmittal Fees
First Resubmittal
Subsequent Resubmittal
$
$
$
358.00 $
218.00 $
10.78 $
379.00
262.00
11.41
N/A
N/A
Storm Drainage Inspection Fees **
Residential Development (per lot)
Non-Residential Development (per ISU)
Minimum Charge
Conveyance Facility Extensions (per foot)
Minimum Charge
Unscheduled Inspections* (per site visit)
$ 38.&2 $ 41.07 N/A
$ 28.01 $ 29.67 N/A
$ 2U1 $ 26.25 N/A
$ 21.57 $ 22.82 N/A
$ 275.00 $ 291.00 N/A
$ 21.57 $ 22.82 N/A
$ 330.00 $ 349.00 N/A
No Charge N/A
$ 275.00 $ 291.00 N/A
$ 16.18 $ 17.12 N/A
$ 16.18 $ 17.12 N/A
$ 165.00 $ 175.00 N/A
$ 0.86 $ 0.91 N/A
$ 330.00 $ 349.00 N/A
$ 19.00 $ 52.00 N/A
*(Unscheduled inspections shall be tracked through the course of a project and billed after the [mal site
inspection. Fees for unscheduled inspections shall be paid prior to [mal occupancy approval.)
** Does not apply to single family residence or duplex construction on an existing established lot.
Utility/Lien Search Fee (Manual)***
$
30.00
$
30.00
***Search per parcel
8 of 8
AFFIDAVIT OF PUBLICATION
Account # 42742 / Ad # 242034
ST ATE OF WASHINGTON
COUNTY OF KITSAP
I, Laura Wessels, being first duly swom on oath, deposes and says: That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of
KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an office maintained in the aforesaid
place of publication of said newspaper; that the following is a true text of a legal advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following date, to wit:
November 26, 2008 and that such newspaper was regularly distributed to its subscribers during all of said
period. That the full amount of the fee charged for the foregoing publication is the sum of$40.38. The
","ounl hos not been p,id in fulL ~C?...~ ~
(Signature of Principal Clerk)
Subscribed and swom to before me this day of December 2,2008.
~~"i...~c
~~~,~ J, MOA~~~>
,.. "-~v alt ~v I
1 0 ',:\;8IUI'; ;. /'.A
, 0;,.;: · ....... ""\".0' ""
(:"- ,~- It(,~, .. % Ii' 0
, '" 'c.r 01 1.\ '1\.
(,{ CI) : ~ ' ./y /J,.. 1J
'.,. -~ ""-.-1
'(I ...... I:J/ P":)' \C' .
~.A ~QI 7,~.}~:..)\.....'.... .-
)7~ ,,' () '." "c). ?-
/<<' .. -(;!. _\J~" ",-0
0;.: ''vVAS~\\-\G
___..$,r
Notary Public in and for the State of Washington, Kits
ORDINANCE NO. 5070
AN ORDINANCE of the City Council of the City of Bremerton, Washington, amending Appendix A of
Section 15.06.015 of the Bremerton Municipal Code relating to assessments, rates, fees, and charges for
municipal water, wastewater, and stormwater services establishing new rates for all categories to
implement a 5.8% CPI increase in water, wastewater, and stormwater charges. And further implementing a
2.2% increase in General Facilities according to the Seattle Construction Index.
PASSED by the City Council the 19th day of November, 2008.
The full text of this ordinance is available from the City Clerk's Office, 345 Sixth Street, Suite 600,
Bremerton, W A 98337.
November 26, 2008...................AD #20080302