Loading...
HomeMy WebLinkAbout4992 ORDINANCE NO. 4q q ~ AN ORDINANCE of the City Council of the City of Bremerton, Washington repealing Ordinance No. 4755 and adopting the City of Bremerton 2005 Water System Plan update. WHEREAS, the City of Bremerton last updated its water system plan in 1999 by adoption of Ordinance No. 4755; and WHEREAS, the City desires to plan for the future and growth in its water system service area; and WHEREAS, a water system plan provides a means to meet future water system needs; and WHEREAS, the City is required to formally adopt a Water System Plan under Washington State Department of Health regulations promulgated under Washington Administrative Code 246-290-100 and Bremerton Municipal Code 15.02.020; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. Ordinance No. 4755 is hereby repealed in its entirety. SECTION 2. Adovtion. That the attached City ofBremerton Water System Plan be adopted. SECTION 3. Severability. If anyone or more sections, subsections, or sentences of this ordinance are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this ordinance and the same shall remain in full force and effect. SECTION 4. Effective Date. This ordinance shall take effect and be in force ten (10) days from and after its passage, approval and publication as provided by law. PASSED by the City C<,>uncil the cdl fbI.~ day of /f-'l';~ {.~ ,2006 X'~~ CECIL Mc ELL, Couricil President I Water System Plan Approved this~O.i;( J day of JlP L~;.1-lAJ ,2006 ~ZEMAN' Mayor -- APPROVED AS TO FORM: ~::~H~~ PUBLISHED the ,3A.L day of EFFECTIVE the /3:t:Ju day of ORDINANCE NO. .y'99~ ~:;~~;;~ ,2006 ,2006 R:\Legal\Legal\Ordinances\Public Works & Utilities\Water System Plan.doc 2 Water System Plan 1iAbl\'c.. \Nor 5 I\-c{MAl\(' 2005 City of Bremerton Water System Plan Main System #08200R and West 517 Zone S'ystem #082734 DECEMBER 2006 City of Bremerton Department of Public Works and Utilities 3027 Olympus Drive Bremerton; WA 98310 Certification This 2005 City of Bremerton Water System Plan was prepared under the direction of the following registered professional engineers: #ZV-~ Michael C. Mecham, P.E. City of Bremerton City Engineer ~. . ,I ;. / " - [#fA 1H11~ ~ ,. Melinda J. Friedman, P.E. HDR Engineer, Inc. Project Manager ,d /J' ,1 t-n "(rp- Douglas C. Howiel P.E. HDR Engineering! Inc. Project Engineer lB.,. ~ City of Bremerton 2005 Water System Plan ~ Introduction and Water System Description 2 Planning Background Information 3 Sources of Supply . 4 Water Quality Review and Regulatory Compliance 5 Transmissjon and Distribution System 6 Operations Program 7 Performance and Design Criteria 8 System Analysis 9 Capital Improvement Plan \... ./ r 10 Financial Plan l l ) 2005 Bremerton Water System Plan TABLE OF CONTENTS Acronyms and Abbreviations .. ........ ................. ... ....... .................................. ....... ... .............. x-i Meeting Bremerton's Water System Needs, An Executive Summary of the Water Supply Plan Update Introduction. ........................................................................................................................... Purpose of the Update............................................................................................................ Forecasting the Growth of Water Demand ............................................................................ 11 Meeting Future Needs: Planning for Conservation and Water Supply Strategies................. III Recommended Capital Improvements and Financing Plan................................................... III Looking Toward the Future. ................. ............ ........ .......... '" ............ ........ ...... ......... ............. IV For More Information........ .................................................................................................... IV Section 1 - Introduction and Water System Description 1.1 Introduction... ... .................. ...................... ................................................ ..................... 1-1 1.2 Water System Planning Objectives...... ........................................... ....................... ....... 1- 2 1.3 Water System Plan Background ....................................... .......... ............ ..... ................. 1-3 1.4 Bremerton Water System History... .......................................... .................................... 1-4 1.5 Overview of Existing System......... ... ...... ................... .................................................. 1-5 1.5.1 Sources of Supply.. ......................................... .................................................. 1-5 1.5.2 Hydraulic Gradients and Pressure Zones.......................................................... 1-6 1.5.3 Storage Facilities............. .... ...... ....................................................................... 1-8 1.5.4 Pump Stations................................................................................................... 1-8 1.5.5 Transmission and Distribution Piping ......... ........... ...... .................................... 1-9 1.5.6 Telemetry and Controls .................................................................................... 1-9 1.6 ExistinglFuture Service Area................. ....................................................................... 1-9 1.6.1 Service Area Agreements ..... ......................... ................. ......................... .... .... .1-1 0 1.6.2 Service Area Characteristics............................................................................ .1-14 1.7 Service Area Policies........................ ........ .......................................... .......................... 1-14 1.7.1 Kitsap County Resolution Adopting the Coordinated Water System Plan ......1-14 1.7.2 Bremerton Municipal Code Regulating City Utility Operations......................1-15 1. 7.3 Outside Service Area Policy.............................................................................1-15 1.8 References..................................................................................................................... 1-15 Section 2 - Planning Background Information 2.1 Existing/Future Service Area...... ..... .... ................ ......................................................... 2-1 2.1.1 Bremerton Service Area within City Limits..................................................... 2-1 2.1.2 Bremerton Service Area in Unincorporated Kitsap County............................. 2-2 2.1.3 Land Use........................................................................................................... 2-2 Table of Contents 1 2005 Bremerton Water System Plan 2.2 Related Plans and Requirements .... ........ .... ... ....... ..... ........... ........... ....... .... .... .... ..... ..... 2-5 2.2.1 City and County Comprehensive Plans under the Growth Management Act.. 2-5 2.2.2 Municipal Water Law...... .......... ... ........ ............ ..... ...... ........... .............. ...... ..... 2-8 2.2.3 Other Related Plans ..... ....... ...... ...... ... ........... ..... ............ .... ......... ... ............... ..... 2-9 2.3 Population Estimates for the Bremerton Water Supply Area.......................................2-10 2.4 Water Production and Demands .... ....... ......... ...... ...... ..... ... ...... ............... ......... ..... ........2-12 2.4.1 Maximum Day Demands ... ...... ....... ......... ..... ......... ........ ............ .... ..... ...... .......2-16 2.4.2 Non-revenue Water. ....... .... ........ .... ..... ................... .... .................. ...... ..... .... ..... 2-22 2.4.3 Equivalent Residential Units ..... ...... ......... ........... ...... ... ... ........... ......... ............. 2-22 2.4.4 Commercial/Industrial Demands ... ......... ........ .......... ....... ....... ..... ....... .............2-23 2. 5 Water Forecasts............................................................................................................ 2-23 2.5.1 Forecast without Conservation. ...... ........................ ......... ............. .... ... ...... .......2-25 2.5.2 Forecast with Conservation ........ .... .... ...... ........ ...... ... ....... ...... ..... ...... .......... .....2-26 2.6 References................................................. .................................................................... 2-28 Section 3 - Sources of Supply 3.1 Introduction. .......................................................... ....................................................... 3-1 3.2 Water Sources............ .................... ....... ........ ...................................... ........... ............... 3-1 3.2.1 Surface Water Sources ........... ...... ...... .... ....................... ....... .................... ...... 3-1 3.2.2 Groundwater Sources ............... ...... ................................. ................. ................ 3,..2 3.3 Enhanced Conservation Measures.................................................. .............................. 3-5 3.4 Water Rights Evaluation....................... ........ ...... ........... .............. ................................. 3-8 3.5 Interties ..... ............................... ..................................................................................... 3-21 3.6 Aquifer Recharge........ '" ............................................................................................... 3-22 3. 7 Water Reuse..................................................................................................... ..... ........3- 22 3.8 Treatment............................. ................................. ........................................... .............3-22 3.9 Climate Change ........................... ......... ...... ................ ................. ........... ......................3-23 3.1 0 Water System Reliability Analysis....................... ............. ..................... ........ ..............3-24 3.10.1 Source Reliability - Water Quantity........ .............................. ........... ...............3-24 3.10.2 Source Reliability - Water Quality...... .... ......... .............. .................................3-25 3.10.3 Water Right Adequacy.. .......... .......... ...... ......... .............. .......... ........ ... ............3-26 3.1 0.4 Facility Reliability..... ........................................ ..............................................3-26 3.10.5 Customer Service Reliability.. ........ ................................................. ...... .........3-27 3.11 References ................. .................... ....................... .................................. .... ..................3-28 Section 4 - Water Quality Review and Regulatory Compliance 4.1 Objective and Approach ........ ............... ........ ............................... ........... ........ ....... ....... 4-1 4.2 Description of State and Federal Regulatory Framework............................................ 4-1 4.2.1 Safe Drinking WaterAct................................................................................... 4-1 4.2.2 Washington Administnitive Code ....... ..... ..... ............. ...... '" .:.. .............. .... ........ 4-1 4.3 System and Supply Overview...................................................................................... 4- 2 Table of Contents 2 2005 Bremerton Water System Plan 4A Water Quality Regulations........................................................................ .......... .......... 4-3 4A.l Phase I, II, and V Rules ..................................................................................... 4-3 4.4.2 Arsenic Rule........... .......... .......... ............. ....................... ........ .............. ............. 4-6 4A.3 Radionuclides Rule. ...... .... ..... ........ .......... ............................... ........................... 4-6 4A.4 Lead and Copper Rule ....................................................................................... 4-7 4 .4.5 Wellhead Protection Program............................................................................ 4-9 4A.6 Total Coliform Rule........ ............................. ......................... ....... ......... ........... .A-l 0 4 A. 7 S urface Water Treatment Rules................. .................................................... ..A-II 4.4.8 Stage 1 Disinfectants/Disinfection By-Products Rule......................................A-17 4A.9 Consumer Confidence Reports and Public Notification Rule..........................A-20 4.4.10 Operator Certification......... ............................. ................................................ .A- 21 4.5 Promulgated Water Quality Regulations.................................................................... .A- 21 4.5.1 Long Term 2 Enhanced Surface Water Treatment Rule ..................................A-22 4.5.2 Stage 2 Disinfectants/Disinfection By-Products Rule.......................................4-24 4.6 Anticipated Regulations.............................................................................................. .A- 26 4.6.1 Unregulated Contaminant Monitoring Rule 2...................................................4-27 4.6.2 Radon Rule....................................................................................................... .4-28 4.6.3 Lead and Copper Rule Revisions ........ ...................................... ....................... A- 28 4.6.4 Groundwater Rule............................................................................................. 4- 29 4.6.5 Total Coliform Rule Revisions............. ............. ............................................... A- 31 4.6.6 Potentially Regulated Contaminants.............................................. ....;....;.;..;.. .A- 33 4.7 Summary of Regulatory Status.... ............ ........... ......................................... ................ A- 33 4.8 Laboratory Certification................................................................................................ 4-41 4.9 References..................................................................................................................... 4-41 Section 5 - Transmission and Distribution System 5.1 Introduction................................................................................................................... 5-1 5.2 Pressure Zones ...................... ................. .................. ..................................................... 5-1 5.3 Control Valves ....................................................................................................... ....... 5-3 5 A Interties with Other Water Systems ....... ....................................................................... 5-3 5.5 Pump Stations .. ... .... .......... ..........,.... .....;........................;.. .............. .... ..... .......... ........... 5-6 5.6 Transmission and Distribution Piping ........ ................................................. ................. 5-9 5.6.1 Transmission Piping.... ................. ..................................................................... 5-9 5.6.2 Distribution Piping............................................................................................ 5-10 5. 7 Storage.......................................................................................................................... 5-11 Section 6 - Operations Program 6.1 Water Utility Organization ......... .................................................................................. 6-1 6.1.1 Responsibilities........,......... ................................................................................ 6-1 6.1 .2 Certi fi cati ons ..................................................................................................... 6-4 Table of Contents 3 2005 Bremerton Water System Plan 6.2 System Operation and Control..... ......... ......... .... ............. ............ ..... ........ ..... ............... 6-5 6.2.1 Components. ..... .... .... ....... ............................................................. .......... ........... 6-5 6.2.2 Normal and Alternative Operation.................................................................... 6-5 6.2.3 Surface Supply Operations at the McKenna Falls Intake Facility.................... 6-5 6.2.4 Groundwater Supply Wells ............................................................................... 6-6 6.2.5 Storage Reservoirs.... .......... ..... ................ ............... ......... ..... .... ..... ........... ........ 6-6 6.2.6 Pump Stations............ ........ ........ ...................... ...... ............................. ............... 6-7 6.2.7 Telemetry and Controls ........................................... ......... ..... .... ........................ 6-7 6.2.8 Preventive Maintenance Pro gram..................................................................... 6-7 6.2.9 Equipment, Supplies, and Chemical Inventory ................................................. 6-7 6.2.10 Fluoridation............... ........................................................................................ 6-8 6.3 Water Quality Control and Monitoring ........................................................................ 6-8 6.3.1 Source Water Quality Protection ...................................................................... 6-8 6.3.2 Routine Procedures .. ................. ....... ............ ..................................................... 6-8 6.3.3 State Reporting................. ................................................................................. 6-9 6.3.4 Treatment and Monitoring Violation Procedures ............................................. 6-9 6.4 Valve Maintenance......................... ........................................................................... ... 6-9 6.5 Hydrant Maintenance .............................................................................. ..................... 6-9 6.6 Flushing Program.. ...................................................... .............................~ ................... 6-9 6.7 Customer Response and Education Program ...............................................................6-10 6.8 Cross-Connection Control Program ........................ .....................................................6-10 6.8.1 Cross-Connection Control Program Elements .................................................. 6-12 6.9 Safety Program.. .................. ........... .............................................................................. 6-18 6.10 Training ... ...... ...................... ........................................................................ .................6-18 6.11 Involvement in Professional Organizations......... ....................... ...... ............................6-19 6.12 Other Operation and Maintenance Responsibilities ............................. ........................6-19 6.13 Emergency Response Program.................................... ..... ................. ...........................6-19 6.13.1 Standby Personnel List.................................... ..... .................... .......................6-19 6.13.2 Vulnerability Analysis and Emergency Planning ...........................................6-19 6.14 Operation and Maintenance Improvements...... ....... ............................. ........................6-21 6.15 References.............................................. ...................................................................... 6-21 Section 7 - Performance and Design Criteria 7.1 System Demands ................. ..................... ..... ...... ......................................................... 7-1 7.2 Pipe Sizing Parameters........................... .................................................... .................. 7-1 7.3 Fire Flow Standards.......................,...... ...,.................................................................... 7-1 7.4 Backup Supply/Systems......................................................................... ...................... 7-2 7.5 System Design Standards ............................................................................................. 7-3 7.5.1 General....................... .....,... .,..... ......................................................................... 7-3 7.5.2 Pipelines............................................................................................................ 7-4 7.5.3 Automatic Control Valves -Pressure Regulating, Reducing, and Relief......... 7-5 7.5.4 Transmission and Distribution Piping Valves................................................... 7-5 7.5.5 Fire Hydrants........................................................ ............................................. 7-5 7.5.6 Disinfection and Testing................................................................................... 7 - 5 Table of Contents 4 2005 Bremerton Water System Plan 7.5.7 Cross-COlmection Control.. .......................... ...... ....... ............ ........... ...... ....... .... 7-6 7.5.8 Other Guidance Standards...................................... .......................... ................. 7-6 Section 8 - System Analysis 8.1 Hydraulic Analysis.. .... ..... ...... ............. .... .........:....... .... ...... ............... ......... ....... ............ 8-1 8.1.1 Methodology.... ...... ....... ... ........ .... ...... ..... ...... .... ...... ... ......... ... ................. ...... ..... 8-1 8.1.2 System Components ............... ........ .............. .... ...... ........... .... ........ .......... ....... '" 8-1 8.1.3 Current System Demand.. ...... ............. ........ ...... ...... ........ ....... ... ... ... .............. ..... 8-1 8.1.4 Calibration.............. ........................................................................................... 8-2 8.1.5 Future System Demand ... ...... ...... .... ....... ............ .... ........... .... ...... ...................... 8-4 8.1.6 Modeling Scenarios........................................................................................... 8-5 8.2 System Physical Capacity Analysis.. ......... .......... ....... ....... ........... .... ...... ... ....... ......... ... 8-8 8.3 Fire Flow Analysis.................... ..................................: ....:........................................... .8-13 8.4 Storage Analysis........... ............................................................................. ...................8-14 8.4.1 Operational Storage.................. ......................................................................... 8-14 8.4.2 Equalizing Storage................. ...... ......... .... ...... .......,....,........... ............................8-15 8.4.3 Standby Emergency Storage................. .... .... .................. ............. ................. .....8-15 8.4.4 Fire Suppression Storage.............................. ................................... ............. .....8-16 8.4.5 Dead Storage .. .... .................... ............................................ ........... .... ................ 8-16 8.4.6 Bremerton System Evaluation................................ ... ................... ..... ............... .8- 33 8.4.7 Storage Recommendations .... ...... ......... ................................................ ............ .8- 35 8.5 Reference............................... ....................................................................................... .8- 36 Section 9 - Capital Improvement Plan 9.1 The Capital Planning Process ...................... ... ............................... ... ................ ........ ..... 9-1 9.2 Identification of Recommended System Improvements................................................ 9-1 9.3 CIP Schedule............. ......................... ...................................... ...................................... 9-2 Section 10 - Financial Plan 10.1 Introduction................................................................................................ ....................10-1 10.1.1 Past Financial History........... ....................................................... ...................10-1 10.1.2 Development of the Financial Plan. ...... .................. ....................... ............. ...1 0-2 10.1.3 Revenue.......................................................................................... ................10- 2 10.1.4 Expenses............................................................................ ............. ................10- 3 10.1.5 External Sources of Funds for Capital Projects..............................................l0-5 10.1.6 Internal Sources of Funding for Capital Projects ...........................................10-8 10.1.7 Summary of the Financial Projections....... .......... ......... .......... ........... .............1 0-9 10.1.8 Reserve Levels................................................................................................10-10 10.1.9 Review of the Existing Water Rates.. ........ .......... ......... ..... ......... ....... .......... ...1 0-11 10.1.10 Overview of Future Water Rates ................. ........ ........................... '" .......... ...10-12 10.1.11 Conservation-Based Rate Design Options ......:..................__..__......................10-13 1 0.1.12 Summary.......... ............... ...... ............... ...... ...... .... ......... ..... ........ ........ .............1 0-14 10.2 References ...... ........ ............. .......... ........... ... ..... .............. ....... ..... ............... ....... ........ .....10-14 Table of Contents 5 Figure 1-1 Figure 1-2a Figure 1-2b Figure 2-1 Figure 2-2 Figure 2-3 Figure 2-4 Figure 2-5 Figure 2-6 Figure 2-7 Figure 2-8 Figure 2-9 Figure 2-10 Figure 2-11 Figure 3-1 Figure 3-2 Figure 4-1 Figure 4-2 Figure 6-1 Table 1-1 Table 1-2 Table 1-3 Table 1-4 Table 1-5 Table 2-1 Table 2-2 Table 2-3 Table 2-4 Table 2-5 Table 2-6 Table of Contents 2005 Bremerton Water System Plan LIST OF FIGURES City of Bremerton Location City of Bremerton Water System West Side Overview City of Bremerton Water System East Side Overview City of Bremerton Eventual Growth Proposal 2004 Comprehensive Plan City of Bremerton Land Use Map Residential Population History and Forecast City of Bremerton Historical Annual Water Production City of Bremerton Water Demands City of Bremerton 1999-2004 Average Water Use by Customer Class City of Bremerton 1999-2004 Average Water Use by Location Puget Sound Naval Shipyard Water Use 1975 - 2004 City of Bremerton Historical Water Use and Demand Forecast City of Bremerton West 517 Zone Water Use Forecast Average Day Demands City of Bremerton Public Works and Utilities Non-revenue Water City of Bremerton Average Day Demand Analysis 2005 - 2024 City of Bremerton Maximum Day Demand Analysis 2005 - 2024 Maximum Daily Turbidity of the Union River Water Supply Main System Disinfection Byproduct Monitoring Results City of Bremerton Department of Public Works and Utilities Organization Chart LIST OF TABLES Water Systems Served by the City of Bremerton Bremerton Water system Summary City of Bremerton Water System Agreements and Contracts Rocky Point Water District Water System Contractual Responsibilities U.S. Navy: Shipyard and Jackson Park Water System Contractual Responsibilities Plans Related to Water System Planning Residential Population Forecasts City of Bremerton Main System Water Supply Area 20-year Water Production History City of Bremerton Main System and Contracted Water Sales City of Bremerton Main System Historical <Lnd Projected Water Use by Type of Use in ERU West 517 Zone Historical and projected Water ADD in MGD 6 Table 2-7 Table 2-8 Table 2-9 Table 2-10 Table 2-11 Table 3-1 Table 3-2 Table 3-3 Table 3-4 Table 3-5 Table 3-6 Table 3-7 Table 3-8 Table 3-9 Table 4-1 Table 4-2 Table 4-3 Table 4-4 Table 4-5 Table 4-6 Table 4-7 Table 4-8 Table 4-9 Table 4-10 Table 4-11 Table 4-12 Table 4-13 Table 4-14 Table 4-15 Table 5-1 Table 5-2 Table 5-3 Table 5-4 Table 5-5 Table 6-1 Table 8-1 Table 8-2 Table 8-3 Table 8-4 2005 Bremerton Water System Plan ERU Calculation for the Bremerton Water Service Area City of Bremerton Main Water System Bremerton West 517 Zone System Proposed Large Commercial/Industrial Development in the Bremerton Water Service Area Water Conservation Goals and Achievements 1999 - 2004 Groundwater Sources for the Bremerton Main System #08200R Groundwater Sources for the Bremerton West 517 Zone System #082734 Bremerton Conservation Practices Water Efficiency Requirements Water Rights for Existing Condition Water Rights for Future Condition (2024) Analysis of Existing and Future Water Demands and Water Rights City of Bremerton Interties with Outside Water Systems Potential Impact of Climate Change on Water Supply Summary of City Sources of Supply Safe Drinking Water Act Rules Main System Lead and Copper Rule Monitoring Results West 517 Zone Lead and Copper Rule Monitoring Results Surface Water Treatment Rule Criteria for Filtration Avoidance Promulgated Rules under the Safe Drinking Water Act Stage 2 DBP Rule Compliance Schedule Anticipated Regulations under the Safe Drinking Water Act Proposed Revisions to the Lead and Copper Rule Summary of Applicable Existing and Promulgated Regulations Summary of Water Quality Monitoring Requirements Sampling Schedule for Main System (2006 through 2011) Sampling Schedule for West 517 Zone (2006 through 2100) Summary of Analytical Costs for Continued Regulatory Compliance ($2006) Laboratories Used by the City of Bremerton for Drinking Water Analysis General Pressure Zone Information Bremerton Main System Control Valves City of Bremerton Main System Pump Stations City of Bremerton Main System Pipe Inventory City of Bremerton Main System Summary of Water Storage Water Utility Management and Supervisory Personnel Water Certifications as of December 2005 Hydrant Flow Test Results City of Bremerton Hydraulic Model Summary of Fire Flow and Peak Hour Scenario Base Conditions Bremerton Water System Physical Capacity Documentation Evaluation of Source Adequacy for Bremerton Water System Table of Contents 7 Table 8-5 Table 8-6 Table 8-7 Table 8-8 Table 8-9 Table 8-10 Table 8-11 Table 8-12 Table 8-13 Table 10-1 Table 10-2 Table 10-3 Table 10-4 Table 10-5 Table 10-6 Table of Contents 2005 Bremerton Water System Plan Evaluation of Storage Adequacy for Bremerton Water System Western Pressure Zones Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone West 440 Evaluation of Storage Adequacy for Bremerton Water System Pressure Zones West 256 and West 440 Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone West 650 Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone East 490 Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone East 398 Evaluation of Storage Adequacy for Bremerton Water System East Pressure Zones Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone West 517 Bremerton Water system Summary of Storage Evaluation Water System Financial History Funding Agency Contacts Summary of the City's Projected Six-Year Financial Plan Overview of the City's 2006 Monthly Retail Water Rates Example of the Development of Fixed Meter Charges Based Upon Meter Capacity Projected Rate Adjustments Needed from 2007 through 2011 8 2005 Bremerton Water System Plan Introduction The City of Bremerton has a remarkable resource: a clean, abundant water supply. Surface water from the Union River and groundwater from production wells provide the source for Bremerton's water. The City supplies approximately 3 billion gallons of water each year from these sources to over 56,000 people, representing over a third of all drinking water supplied in Kitsap County. Bremerton's water system is a Group A System operated as a municipally- owned water utility under the direction of the City of Bremerton Department of Public Works and. Utilities. Bremerton Municipal Code regulates City Utility operations to provide safe and reliable water service. The water service area consists of the Bremerton City limits and portions of the surrounding unincorporated area in Kitsap County. Approximately half of the water is used within the city limits, a third is provided to the Puget Sound Naval Shipyard, and the remainder is used in the unincorporated areas. All customers are represented by the Bremerton City Council, the Bremerton Water Utility's governing body. Purpose of the Update The 2005 City of Bremerton Water System Plan (WSP) Update was prepared in response to Washington State Department of Health (DOH) regulations, which require all water purveyors to update their water system plans every 6 years. Changes since the last plan that affect Bremerton's water system planning include: . Projected population growth increase in Bremerton's water service area, with a resulting projected increase in potable water demand, . The update ofthe Kitsap County Coordinated Water System Plan, in which Bremerton's water system figures as a key element, . Passage of theW ashiIlgton State Municipal Water Law requiring water systems to implement more specific water efficiency measures and requires more coordiIlationofwaterplanning between state and local agencies, . Assumption of the Tracyton Water System by Bremerton in 2004, and . Implementation of Watershed Planning for the Kitsap Peninsula in 2000 and plan veto in 2005 which halted the process. Executive Summary 2005 Bremerton Water System Plan The Water System Plan Update describes . The existing water system, . Future demands on the system forecasted over a 20-year planning horizon, . A conservation plan designed to lessen these predicted demands, and . A number of potential capital improvement projects to address supply, distribution, and storage needs in Bremerton's water service area. In accordance with the Growth Management Act, this plan is designed to be consistent with other City of Bremerton, Kitsap County, and regional plans for land use and municipal facilities. It will be used by City planners in their review of proposed land use actions to ensure that these actions are compatible with the long-range plans for Bremerton's water system. Forecasting the Growth of Water Demand The key to developing a water system planis the ability to project the demands that will be made on the system in future years. In Bremerton, planning for the water system's future must take place on both a local and regional level. City of Bremerton Water Demand Forecast Population growth and the resulting water demand were projected for the entire Bremerton water service area on the basis of Comprehensive Plans for City of Bremerton and Kitsap County. The projections indicate that total average day demand for water will increase from the current level of about 7.7 million gallons per day (MGD) to about 11.3 MGD in the year 2024, an increase of 45 percent. 25 I I ___-.~ I 20 --~ __________ Maximum Day Demand ~..--- ..y-~~ ,., .. o ~ 15 <II C .2 .. Cl C 10 ~ ~ Oro ht Average Day Demand 1999 2001 2003 2005 2007 2009 2011 2013 2015 2017 2019 2021 2023 The City's capital improvement planning identifies needed improvements to its distribution and storage systems by comparing the current capacity of those systems with the capacity required if the population of the service area increased as predicted. ii Executive Summary 2005 Bremerton Water System Plan Meeting Future Needs: Planning for Conservation and Water Supply Strategies Water conservation is an important means of deferring the need to develop additional sources of water supply. Conservation can serve as an additional increment of supply by enabling the existing transmission and distribution systems to serve more customers while maintaining the same capacity. The ability to postpone the construction of capital facilities makes conservation an option that is both cost-effective and environmentally sound. The conservation plan combines proven measures used by the Bremerton Water Utility in past years with public education and involvement activities promoting the advantages of water conservation by means of school programs, special events, and the distribution of home conservation kits, printed information, and mass media. Overall, the recommended conservation measures are projected to result in water savings of 5.2% by 2024. Potential regional water supply opportunities to meet predicted growth m demand include: . Maximizing conservation opportunities, . Expanding groundwater resources, . U sing reclaimed water from the City's wastewater treatment plant, and . Aquifer storage and recovery. Recommended Capital Improvements and Financing Plan The Water System Plan contains the City's capital improvement program (CIP), developed to guide the growth of Bremerton's water system through the year 2025. Included in the CIP are: . Improvements to distribution system plpmg and storage, . Construction of an ultraviolet treatment facility to meet new federal regulations, . Upgrades to groundwater supply systems, and . Continuation of seismic and security upgrades to supply.facilities and reservoirs. The total cost of capital improvements proposed from 2006 through 2025 is $48 million. Funding will come from a variety of sources, including developer Executive Summary III 2005 Bremerton Water System Plan extensions, capital facility charges for new hookups, state and federal loan programs, rates, and bond sales. The capital improvement program developed in this plan is highly dependent on the rate, location, and nature of future development within the Bremerton Service Area. If development proceeds in a manner significantly different from the assumptions and projections used for this plan, revisions to the CIP may be necessary. Looking Toward the Future The main challenges in the future of the Bremerton water system as described in this plan are: . Providing appropriate water supply and infrastructure to meet the anticipated growth in the water service area, . Maintaining compliance with current and future water quality regulations as required by the Safe Drinking Water Act, . Communicating effectively with water customers about the value of their water system to increase customer understanding, confidence, and support. For More Information . Visit the City of Bremerton web site at www.ci.bremerton.wa.us . Call the Utility Customer Response line at (360) 473-5920. . Contact your City Council Representative. City Council meets Wednesdays at 5:30 p.m. and meetings are televised on Bremerton-Kitsap Access Television Channels. Executive Summary iv Acronyms and Abbreviations 2005 Bremerton Water System Plan Acronyms and Abbreviations ADD AFY AMCL ASR AWWA BAT BMC BWSA CCF CCL CCP CCR CCS CCWF CENCOM CFP CFR cfs Cfu/mL CIP City CMP Council County CPR CT Cu ft CWS CWSP DBP D/DBPR DCD DNR DOH DSC DWSRF Ecology EPA EPA GPTRAC Average daily demand Acre-feet per year Alternative maximum contaminant level Aquifer storage and recovery American Water Works Association Backflow assembly tester Bremerton Municipal Code Bremerton water service area Corrosion Control Facility Contaminant Candidate List Cross connection control program Consumer Confidence Report Cross Connection Control Specialist Centennial Clean Water Fund Central Communications emergency dispatch in KitsapCounty Capital Facilities Plan Code of Federal Regulations Cubic feet per second Coliform forming units per milliliter Capital Improvement Program City of Bremerton Coliform monitoring plan City of Bremerton, Washington City Council Kitsap County . Cardio pulmonary resuscitation Disinfectant concentration multiplied by time Cubic Feet (sometimes also written as ft3) Community water system Kitsap County Coordinated Water System Plan Disinfection by-product Disinfectant/Disinfection By-Product Rule Department of Community Development Department of Natural Resources Washington State Department of Health Debt service coverage Drinking Water State Revolving Fund Washington State Department of Ecology United States Environmental Protection Agency Environmental Protection Agency - Groundwater Pollutant Acronyms and Abbreviations ESA ERP ERU ET FEMA FF fps gal GED GIS GMA gpd gpm GPTRAC GUI GWMP GWR HAA5 HCP HPA HPC hrs IDSE IESWTR IFC IFR laC ISO JHA kW LCR LOS LRAA LT2 ESWTR MCL MCLG MDD MG MGD mg/L Mgal MGY MID 2005 Bremerton Water System Plan Tracing Model Endangered Species Act Emergency response plan Equivalent residential unit Evapotranspiration Federal Emergency Management Agency Required fire flow rate Feet per second Gallons General Education Degree Geographic information system Growth Management Act Gallons per day Gallons per minute General particle tracking hydrogeological model module Groundwater under the influence of surface water Groundwater Management Plan Groundwater Rule Haloacetic Acid (Sum of 5) Habitat Conservation Plan Hydraulic Project Approval Heterotrophic plate count Hours Initial distribution system evaluation Interim Enhanced Surface Water Treatment Rule International Fire Code Instream flow requirements Inorganic contaminants Insurance Services Office Jurisdiction having authority Kilowatt Lead and Copper Rule level of service Locational running annual average Long Term 2 Enhanced Surface Water Treatment Rule Maximum contaminant level goal Maximum contaminant level goal Maximum day demand Million gallons Million Gallons per Day Milligrams per liter (equivalent to parts per million) Million gallons Million gallons per year Maximum instantaneous demand Acronyms and Abbreviations ml MMM MMS MOU MRDL MREM/year MSDS MTTP MtBE MTU MWL N N/A NaOH NMFS NOM NTNC NTU O&M OFM OSHA OWQP PHD pCi/L PLC PM PNR PNWS-AWWA POE PHD PRSC PRV PSE pSI PSM PSNS&IMF PVC PWS PWTF Qa Qi QL Qs 2005 Bremerton Water System Plan Milliliters Multimedia mitigation Maintenance management software Memorandum of understanding Maximum Residual Disinfectant Level Millirem per year Material safety data sheet Maximum total trihalomethane potential Methyl-t-butyl ether master telemetry unit Municipal Water Law Nitrogen Not Applicable Sodium Hydroxide (Caustic Soda) National Marine Fisheries Service Natural organic matter Non-transient non-community Nephelometric Turbidity Unit Operation and maintenance Washington State Office of Financial Management Occupational Safety and Health Administration Optimal water quality parameters Peak hourly demand Picocurries per liter Programmable logic controller Preventative maintenance Public Notification Rule Pacific Northwest Section American Water Works Association Point of entry Peak hourly demand Puget Sound Regional Council Pressure Reducing/Regulating Valve Puget Sound Energy Pounds per square inch Process Safety Management Puget Sound Naval Shipyard and Intermediate Maintenance Facility Polyvinyl chloride Public water system Public Works Trust Fund Annual quantity Instantaneous quantity Largest capacity source available Source production rate Acronyms and Abbreviations RAA RAM- WTM RMP RTUs SARA SCADA SDWA SKIA SMP SOC SSS SU SWTR TCR THMs tM TOC TTHM UGA ~g/L UGMA ULID USC. USEPA USFWS Utility UV VA VOC WAC WaterPAK WCP WDFW WFI WHPA WHPP WQP WRIA WSDOT/APWA WSP WUEP WWTP 2005 Bremerton Water System Plan Running annual average Risk Assessment Methodology for Water Utilities Clean Air Act Risk Management Plan Remote telemetry units Superfund Amendments and Reauthorization Act Supervisory control and data acquisition Safe Drinking Water Act South Kitsap Industrial Area Standard monitoring plan Synthetic organic carbon System specific study Standard units Surface Water Treatment Rule Total Coliform Rule Trihalomethanes Duration Total Organic Carbon Total trihalomethanes(suIh of 4) Urban growth area Micrograms per liter (equivalent to parts per billion) Urban growth management agreements Utility local improvement district University of Southern California United States Environmental Protection Agency United States Fish and Wildlife Service City of Bremerton Water Utility Ultraviolet Vulnerability assessment Volatile organic chemical Washington Administrative Code Water Purveyors Association of Kitsap County Watershed control program Washington Department of Fish and Wildlife Water Facilities Inventory Wellhead protection area Wellhead protection program Water quality parameter Water Resource Inventory Area Washington State Department of Transportation/American Public Works Association Water system plan Water use efficiency plan Wastewater treatment plant Acronyms and Abbreviations 2005 City of Bremerton Water System Plan Section 1 Introduction and Water System Description 1.1 Introduction The City of Bremerton has a remarkable resource: a clean, abundant water supply. The Bremerton Water Utility supplies approximately 3 billion gallons of water each year to over 56,000 people. This represents over a third of all the drinking water supplied in Kitsap County. Bremerton's Group A water system is a municipally-owned water utility under the direction of the City ofBremerton Department of Public Works and Utilities. Bremerton Municipal Code (BMC) Title 15 regulates City Utility operations to provide safe, reliable service to the residents of the City of Bremerton and to those non-residents within the service area. These utility operations include water, wastewater, and stormwater. The Water Utility is managed as an enterprise fund in the City's budget. The water service area consists of the Bremerton city limits and portions of the surrounding unincorporated area in Kitsap County. Approximately 80 percent of the water is used within the city limits (includmg "Navy systems), and 20 percent is used in the unincorporated areas. All customers are represented by the Bremerton City Council, Bremerton Water Utility's governing body. The Bremerton Water Utility owns and operates two water systems. Additionally, the Bremerton Water Utility has contractual requirements to provide water supply, operations, and maintenance for the Rocky Point Water District, supply all the water to the Puget Sound Naval Shipyard and Jackson Park Naval Housing water systems, and sell water to the City of Port Orchard as outlined in Table 1-1 below. of Bremerton Approximate Population Served 2005 WATER'.SYSTEMS'O:WNED~~I~~]).~.OgERATED;B::Yr'BREM.ERTON~~WA:tERRtimiTY. Bremerton Main S stem Class A Communi WA08200R 49,521 Class A Non-transient Non-communi .' ,..":<;;t~~:~r;.~I;~~\~!~~~~~r,m~jll~~~~~II~~t1~:~;i1~l Bremerton West 517 Zone Sy!o1em Name System Type WFI# Roc Point Water District Class A Communi W A02052E 1,740 ....:...:....m;\;WWj}EWS~STEM.SJR'UR6msI~tQ;W~f.iRrQNJJ!f;~FRijwt::jREMER;T~QNSWAi\ER(;il'ijflliITtt:...~".::....~..,~:l Puget Sound Naval Shipyard and Intermediate Maintenance Facili Jackson Park Naval Housin Ci of Port Orchard Class A Comniunity W A03468C 2,903 W A03468C W A68900 2,540 NA The West 517 Zone system was determined to be a separate water system by the Department of Health in 2001. This WSP includes required planning information for both systems owned and Water System Description 1-1 2005 City of Bremerton Water System Plan operated by the City of Bremerton. Since the W517 Zone is a small non-transient, non- community system, it is only required to prepare a small water system plan; however, since it is operated in conjunction with Bremerton's main system, its planning information will be included in this Water System Plan. Copies of the Water Facility Inventory form for both systems are included in the Appendices. Other water systems purchasing water from the City of Bremerton are responsible for their own water system planning (see Table 1-4). 1.2 Water System Planning Objectives The purpose ofa Water System Plan is to provide a uniform process for purveyors to: · IdentifY present and future needs, . Set forth the means for addressing those needs, and · Demonstrate the system has the operational, technical, managerial, and financial capability to maintain compliance with all relevant local, state, and federal plans and regulations. Bremerton is required to develop a WSP according to Chapter 246-290-100 Washington Administrative Code (WAC) and by BMC Section 15.02.020. This WSP is to be approved by the Mayor, adopted by the City Council, and administered by the Director of Public Works and Utilities. All anticipated water system projects should be identified in the Capital Improvement Program portion of the WSP. Information contained in the WSP should be referenced when proposing new facilities or modifications to new facilities. Figure 1-1 City of Bremerton location ~'.."c,<,"",,,, 1....,-,0 [J.;:..~ ((-'or,:": C;O~.:-"" II Water System Description 1-2 2005 City of Bremerton Water System Plan 1.3 Water System Plan Background Previous WSPs were completed in 1975, 1982, 1992, and 1999. The last plan was approved by the Washington Department of Health (DOH) in December 2000. This 2005 WSP update was prepared in accordance with DOH regulations (WAC 246-290), the DOH "Water System Planning Handbook", and the 2003 Municipal Water Supply Efficiency Requirements Act, and was also coordinated with the City of Bremerton Comprehensive Plan, the Kitsap County Comprehensive Plan, and the Kitsap County Coordinated Water System Plan. The following changes have occurred since the 1999 WSP was completed: · The Risk Management Plan for Chlorine in compliance with 40 CFR 68 Clean Air Act required that the Environmental Protection Agency (EP A) implement a program to manage and prevent accidental releases of hazardous substances. Bremerton completed the requirements for this regulation in 1999 and is in compliance with all updates. · Implementation of the 1998 Washington State Watershed Management Act began in the Kitsap Peninsula in 2000 but this water planning process was halted in 2005 due to a veto from the Squaxin Island Tribe. · The Bremerton West 51 T Zone was designated as a separate water system in 2001. · The United States Congress passed the Public Health Security and Bioterrorism Preparedness and Response Act of 2002. A Vulnerability Assessment and Emergency Response Plan were developed for the Bremerton water system in compliance with this act. · Passage of the Washington State Municipal Water Law in 2003 requires water systems to implement more specific water efficiency measures and requires more coordination of water planning between state and local agencies. · The Tracyton Water System was assumed by the City ofBremerton in 2004. · The Kitsap County Coordinated Water System Plan was updated in 2004. · An agreement with the City of Port Orchard in 2005 specifies wholesale water sales from Bremerton and coordination of the West 580 Pressure Zone development. The following Sections comprise this WSP: Section 1 Introduction and Water System Description Section 2 Planning Background Information Section 3 Sources of Supply Section 4 Water Quality and Regulatory Compliance Section 5 Transmission and Distribution System Section 6 Operations Program Section 7 Performance and Design Criteria Section 8 System Analysis Section 9 Capital Improvement Plan Section 10 Financlal Plan Water System Description 1-3 2005 City of Bremerton Water System Plan The following documents are also part of this WSP by reference. The date in parentheses indicates the year the document was last revised: Wellhead Protection Plan (1996) Water Reuse Feasibility Study (1998/2005) Water Rights Analysis (2006) Watershed Control Plan (2006) Vulnerability Assessment as required by the Bioterrorism Act (2003) Emergency Response Plan as required by the Bioterrorism Act (2004) Risk Management Plan for Chlorine (2004) Service area boundary map and resolution of service area agreements (2005) Interim Water Use Efficiency Plan (2005) Rate Study (2004) Water Shortage Contingency Plan (2002) Coliform Monitoring Plan (updated annually) Organicslinorganics Monitoring Plan (updated annually) On November 2, 2005, the BremertonCity Council authorized the Mayor to execute the contract for HDR Engineering to assist the City with this WSP Update. 1.4 Bremerton Water System History When the town of Bremerton was incorporated in 1901, with a population of 1,000, drinking water came from local wells and streams. The City of Bremerton has had a public water supply system since 1902, when a private water company, The Pacific Coast Pipe Company, diverted water from Charleston Creek. The Anderson and Gorst Creek sources were developed in 1909 and 1911, respectively. The City of Bremerton purchased the 2 million gallons per day (MGD) water system in 1917 for $225,000. Growth of the Puget Sound Naval Shipyard and the City after World War I required significant improvements to the water system. In 1919, storage for 10 million gallons (MG) was added with the construction of Reservoir 4. The Union River was considered as a future water supply source. In the 1930's, 2,800 acres of the Gorst Creek watershed and 2,200 acres of the Union River watershed were purchased by the City. Development of the Anderson Creek wellfield began in 1940 to meet increased demands of World War II shipyard activity. Reservoir 4's capacity was increased to 11 MG in 1945. Casad Dam on the Union River was completed in 1956. Use of Charleston, Gorst, and Anderson Creeks as potable water supplies was discontinued in 1963, 1979, and 1984, respectively. Gorst and Anderson Creeks are still maintained as emergency water supplies. Since the late 1970s, the City has been developing ground water sources in East Bremerton and the Gorst Creek Basin, and in 2005 rehabilitation of the Anderson Creek well field was completed. In 1992, Bremerton received approval from DOH to continue to operate the Union River surface water supply as an unfiltered source. Bremerton is one of only a few systems nationwide that can meet the strict water quality requirements (which are described in Section 4) and is approved to operate an unfiltered surface supply. In 2001, DOH designated the West 517 Zone as a separate Water System Description 1-4 2005 City of Bremerton Water System Plan water system. In 2004 the Tracyton Water District service area was assumed by the Bremerton Water Utility. 1.5 Overview of Existing System The City of Bremerton draws water from a large surface water reservoir on the Union River and thirteen wells. Water is distributed to customers via approximately 300 miles of water pipe varying in size up to 36 inches in diameter. Pump stations move water from pressure zone to pressure zone and distribution system reservoirs provide storage. Booster stations and pressure regulating stations control service pressures within the system. Facility locations are shown in the Schematic (Figures I-2a-b) and Water System Map (Figures I-3a-c). A summary of the Bremerton water system is provided in Table 1-2. Detailed descriptions and inventories are provided in the following sections. remerton a er system ummary" """"",<';.< " ,_-,7~;''',,>,,,<,,'l-'' .~,,- ,\_:..."" r"', .'~~~''> -,- .~,", ',.,.. ". ",," ,..- -, - '\ ,'J' .... .... .......:.. .., .....>..;...,...... .:..... ':': ";i':':' .. '.' .' '. .. :~.y"yA:TER/SySTEM ... ..... . . . . Sources Union River and 10 wells, intertie with W517 Zone 6- Year Average Day Demand 7.7 million gallons per day 6- Year average Equivalent Residential Unit Use 183 gallons per day per single family residence Number of Connections 16,361 Population Served 49,521 Miles of Pipe 291 miles Number of Reservoirs 3 raw water, 16 treated water Number of Pump Stations 10 Number of Pressure Booster Stations 5 Number of Pressure Reducing Stations 14 Number of Pressure Relief Valves 7 (includes 2 surge anticipators) Service Area 12,100 acres (not including the watershed) Pressure Zones W256, W440, W580, W650,E240,E398,E490 ":~~~.:~j;;t;~~Q~~S)'~~M",,' . . ., .' . . ..~'.'~r;.<..::';<'\'~ ; 'oZ,::' .....,..:'...(.:... ....~.' .., Sources 3 wells and intertie with the main Bremerton system 6-Year Average Day Demand (summer) 0.5 million gallons per day Equivalent Residential Unit Use This system is a non-transient, non:-eomnmnity system Number of Connections 63 Population Served (employees) 400 Miles of Pipe 11 Number of Reservoirs 2 Number of Pump Stations 1 Number of Pressure Booster Stations . 1 . Number of Pressure Reducing Stations . . 2. Number of Pressure Relief Valves 2 Service Area 3,786 acres Pressure Zone W517 Table 1-2 B Wt s s " As December 2005 Water System Description 1-5 2005 City of Bremerton Water System Plan 1.5.1 Sources of Supply Surface Water Approximately 60 percent of the water supply for the City of Bremerton is provided by the Union River system. The main source is the Union River Reservoir, located behind Casad Dam, a concrete arch structure that rises 130 feet above the river and provides approximately 1.4 billion gallons of water storage. Water flows from the reservoir down the natural streambed to the McKenna Falls Intake Facility. Three branches of the Union River meet near the Intake Facility. Water from the Union River and West Branch (used seasonally) is blended at the McKenna Falls Intake Facility, where it is screened and cWorinated. Water then enters the transmission main and flows to the distribution entrance point at Reservoir 4, where it is treated with sodium hydroxide for corrosion control. Flow is controlled by a valve at Casad Dam, a flow control valve on the transmission main near the Twin Lakes Reservoir, and by the level in Reservoir 4. Since 1992, the East Branch of the Union River no longer enters the intake but continues downstream to meet downstream flow requirements. Bremerton owns and controls 98 percent of the 2,964-acre Union River watershed that supplies the McKenna Falls Intake Facility. This allows the City to effectively control the activities in the watershed and protect source water quality. The estimated firm yield for the Union River System is 2,020 million gallons per year (MGY). The City of Bremerton actively protects its watersheds through the provisions 'in the Watershed Control Plan and the Bremerton Land Management Plan, which include security and monitoring provisions. The accessible areas of the watersheds are fenced, gated, and signed to limit access only to authorized personnel. The area is regularly patrolled to ensure trespassing is kept to a minimum. Regular water quality monitoring of the surface sources verifies the effectiveness of the watershed protection program for the City. The City operates the surface system under the non-filtration requirements of the Surface Water Treatment Rule (SWTR). To continue to operate the Union River source as an unfiltered supply, Bremerton is required to conduct an annual sanitary survey by DOH and submit an annual watershed monitoring report to DOH documenting compliance with the unfiltered source criteria of the SWTR. Water quality of the surface sources is excellent. Turbidity is continuously monitored and is generally below 1 Nephelometric Turbidity Unit (NTU). Higher turbidity levels do occur during heavy rains; however, these events are usually of short duration. When turbidity approaches higher than desirable values, the water to the intake is shut down, and the water either bypasses the intake or is stored in the Union Reservoir until sufficient settling occurs. High turbidity water from the West Branch is not allowed to enter the system and passes downstream. Raw water coliform testing confirms that fecal coliform concentrations are less than 20 colonies/100 mL in 90 percent of the samples collected over any 6-month period. With the redundant cWorination facilities, automatic system shutdown capabiiities, and bypassing of turbid water, water quality of the surface source meets all Safe Drinking Water Act (SDWA) requirements. Water System Description 1-6 2005 City of Bremerton Water System Plan To comply with the SWTR, cWorine contact time (CT) values are calculated according to WAC 246-290-636. Chlorine residual is monitored continuously at the Twin Lakes valve, Pump Station 3, Gorst Monitoring Station, and Reservoir 4. For process control, a minimum cWorine residual of approximately 1.4 milligrams per liter (mg/L) is maintained at the entrance to the transmission system at the McKenna Falls Facility, and a minimum cWorine residual of approximately 1.0 mg/L is maintained at the entrance to the distribution system at the Reservoir 4 inlet. The State requirement is a minimum of 0.2 mg/L at the entrance to the distribution system with detectable cWorine residual throughout the distribution system. CWorine grab samples are taken at points in the distribution system at the same times and locations as coliform samples. Prior to entering Reservoir 4, the pH of the water is increased with sodium hydroxide at the Corrosion Control Facility (CCF) in accordance with 40 CFR Part 141.83. The target pH value is 7.7 standard units (SU). The CCF began operating in March 1999. Distribution system pH and customer tap lead and copper monitoring verifies the effectiveness of the corrosion control treatment. Groundwater The City of Bremerton's main system currently has ten active production wells supplying approximately 40 percent of the water to the system. The West 517 Zone system has three wells serving that system. The City completed two other wells (Wells 21 and 22) not yet been put into production pending water rights approvals and two replacement wells at Anderson Creek. The wells (described in detail in Table 3-1) are generally located in three groups: East Bremerton wells, Anderson Creek watershed wells, and Gorst Creek watershed wells. The locations of the wells within the system are shown on the Water System Map and Schematic (Figures 1-2 and 1-3). Most wells pump directly into the system during operation and are controlled through the Supervisory Control and Data Acquisition (SCADA) system by the level in the reservoir(s) they supply. Anderson Creek wells pump into a common sump, and discharge into the system is controlled by system operators. Water quality in the wells is excellent. Each well, with the exception of Well 19, is equipped with cWorination facilities for disinfection. The eight aquifers the City draws drinking water from are: · Anderson Creek Shallow Artesian Aquifer · Anderson Creek Deep Artesian Aquifer . Twin Lakes Aquifer · Gorst Sea Level Aquifer . Gorst Valley Aquifer . Manette Sea Level Aquifer Wells lR, 2R, and 3 Wells 6R, 7, and 8 Wells 15,17,18, 19, and 20 . Well 16 (irrigationonly) Well 22 (water rights application) Wells 13 and 14 e .Meadowdale Aquifer '1.1..11 21 ('Hot",r ":~"'4-" ~~~I~~~4-;~_\ y" vU . '- vva <;a BoUt;) app J",aUVH} . Parkwood East Aquifer Well 9 Water System Description 1-7 2005 City of Bremerton Water System Plan Aquifer characteristics are more thoroughly discussed in Bremerton's Wellhead Protection Plan (1996) which was previously submitted to DOH. Water Rights Water rights are discussed in Section 3, Sources of Supply. 1.5.2 Hydraulic Gradients and Pressure Zones The City of Bremerton operates eight major hydraulic gradients or pressure zones within the distribution and transmission network. Seven pressure zones are in the main system: four zones in West Bremerton (W256, W440, W580 and W650) and three in East Bremerton (E240, E398, and E490). One pressure zone is in the West 517 Zone system. The number designation refers to the overflow elevation of the controlling reservoir(s). These pressure zones are illustrated in the Water System Map (Figure 1-3). Hydraulic gradients within the zones are generally controlled by the water levels in the system reservoirs. Service pressures within the zones are maintained at acceptable levels under normal, peak, and emergency operating conditions. Pressure regulating valves are described in Section 5 and include installations for reducing pressure and pressure relief Pressure reducing stations allow water to flow from higher pressure zones to lower pressure zones as needed. Pressure relief valves prevent over- pressurization by relieving excess pressure to atmosphere or to a lower pressure zone. 1.5.3 Storage Facilities The City of Bremerton currently operates 19 reservoirs (16 distribution and 3 raw water) in the Main System and two reservoirs in the West 517 Zone System. These reservoirs range in storage volume from the Union River Reservoir behind Casad Dam to Reservoir 6, a 0.15 million gallon (MG) elevated steel tank. The reservoirs are described in detail in Section 5 and provide peak demand storage, emergency and fire flow reserve, and hydraulic gradient control for the system. A total of 32 MG of storage capacity presently exists within the Main System and l.2MG in the West 517 Zone System. When it is full, the Union River Reservoir provides 1,400 MG of water in storage for the system. Excess water from the Union River canbe diverted to the Twin Lakes Reservoir; however, the Twin Lakes reservoir does not directly provide storage to the system. The Twin Lakes Reservoir sits on a hydrogeologic divide and has no natural outlet. Its water seeps into the ground to provide groundwater recharge to both the Gorst Creek Watershed wells and to the Union River drainage. 1.5.4 Pump Stations. Bremerton operates pump stations ranging in size from 60 gpm to 4,000 gpm. Descriptions of the existing pump stations are listed in Section 5. The pump stations move water from lower pressure zones to water storage reservoirs in higher elevation pressure zones. Booster stations increase the pressure in a limited area to adequate Water System Description 1-8 2005 City of Bremerton Water System Plan pressures. These stations are required to ensure an adequate supply of water at acceptable pressures to all customers in the system. 1.5.5 Transmission and Distribution Piping Bremerton has an extensive network of transmission and distribution piping ranging in size up to 36 inches in diameter. The pipe inventory lists approximately 300 miles of pipe with the majority being 6-inch or 8-inch diameter distribution piping. A listing of the quantity of pipe by diameter is provided in Section 5. Transmission main piping is used to move large quantities of water from one area of the system to another, generally without service connections. It includes the piping bringing water from the McKenna Falls Intake Facility and the three pipes crossing the Port Washington Narrows to supply the east side of the system. The distribution system serving the City of Bremerton is a grid of 4-inch to 16-inch mains comprised of cast iron, ductile iron, polyvinyl chloride (PVC), steel, galvanized steel, and asbestos cement materials. Ductile iron and cast iron pipe make up the majority of the system. Flow within the system is generally from west to east. The system contains fire hydrants and valves to provide Utility customers with fire protection. 1.5.6 Telemetry and Controls The City ofBremerton utilizes a sophisticated SCADA system to monitor and control the water supply and distribution system. A central computer and two master telemetry units (MTUs) are located at the Public Works and Utilities office. Additional information on the SCADA system is provided in Section 6. 1.6 Existing/Future Service Area Figure 1-4 shows the City ofBremerton Water Utility service area. The City ofBremerton Water Utility's main system serves over 56,000 residents in Bremerton and portions of Kit sap County, including the Gorst area to the south and the western portion of the Manette Peninsula in central Kitsap County from the city limits to Bucklin Hill Road. The West 517 Zone service area includes the Gold Mountain Golf Course, Aero Mobile Estates (master metered), Bremerton National Airport, and the Port of Bremerton Industrial Park. The City also provides water and operations and maintenance to the Rocky Point Water District and contracts to supply water to the Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF) and the City of Port Orchard. (Refer to Tables 1-3 through 1-5 for details on water service agreements.) The current service area includes approximately 5,300 acres within the Bremerton city liinits, not including PSNS&IMF. Bremerton serves approximately 6,800 acres within Kitsap County, including the Rocky Point Water District. As shown on Figure 1-4, the City ofBremerton Water Utility service area is essentially contiguous with the surrounding water purveyors as follows: · North - Silverdale Water District and Erland Point Water Company · South - The City of Port Orchard and the Sunnyslope Water District Water System Description 1-9 2005 City of Bremerton Water System Plan · East - North Perry Avenue Water District · West - Unclaimed service area 1.6.1 Service Area Agreements The Utility has written service area agreements on the boundaries between their respective service areas with: · Erland Point Water Company · North Perry Avenue Water District · Rocky Point Water District · Silverdale Water District · Sunnyslope Water District Currently, Bremerton is in the process of developing a written service area agreement with the City of Port Orchard. Tables 1-3, 1-4, and 1-5 summarize the agreements between the City ofBremerton Water Utility and other water systems. Growth in the service area is expected to occur in the area north of the city limits in the Manette Peninsula, south of the city limits near the Bremerton Airport, south of Werner Road, and west of Kit sap Lake. Population projections and land use are described in more detail in Section 2. The City currently pursues annexation of areas on the edges of the city limits. The Outside Utilities Agreement must be executed prior to receiving water service outside city limits in accordance with the Bremerton Service Area policy that requires property owners outside the City boundaries to support annexation to the City ofBremerton as a condition for receiving City utilities (see Section 1.7.3). Water System Description 1-10 2005 City of Bremerton Water System Plan Document Date TRACY tON WATER DISTRiCT. 2004 Outlines the assumption of the Water District by the City of Bremerton Water Utility. lnterlocal :]iilCKV,POfflTWATERDISTtUCT " Service Area Agreement and Agreement to S I W boundary. See Table 1-4. u ater ljEPAR'tMENl'OF.'imfNAW .. Provides water service quality and quantity provisions for: Puget Sound Naval Shipyard (3 meters), Jackson Park Complex/Navy Hospital (2 meters), East Park Naval Housing - currently inactive (I meter), Navy Building at Bremerton National Airport (1 meter), Camp McKean, Kitsap Lake Recreation Area (1 meter), Navy-leased building on Wycoff Avenue (1 meter), and Pass and ID Buildin :il~ml0F/P'OR'F0RC~iW~i.o:'.S.,.i.,.:. lntertie Maintains water system intertie at Anderson Hill Water 1996 Road for supplying domestic supply on a surplus Purchase basis. Intertie 2005 Estab~shes.respective service area boundaries and A eement use of mtenes. 7SJ:EWRb~t;&};WXTER;:6IStRiC!t... 1998 Provides interim water service, operations and maintenance, pipe installation, meter reading and billing, conveyance of pipeline, and service area Updates agreement from 1960. Water and Sewer Service 1997 Contract # N44255-96-M2292 Updmesagreementfrom 1989. Current Service Area Agreement 1982 Current Current Establishes respective Service area boundaries. Current Water System Description 1-11 2005 City of Bremerton Water System Plan Table 1-4 Rocky Point Water District Water System Contractual Responsibilities Activities By City DOH In # 02052E By Customer Other 'WATERSVSTE1\iPLAN \." :;:.... ,. Population and Demand Projections . Financial Planning . Capital Improvement Planning . Operation and Maintenance Program . Emergency Response Program . Water Conservation Program . ,OPEMrt()NS:i~niMA'l:NtENAN€E' . . i....;~....... ..';;.; ....;; >< ''-', ...' .' .';. Routine Main Flushing . Hvdrant Testing and Repair . Cross-Connection Program . Backflow Prevention Assembly Testing . Disinfection of New Facilities . Customer Complaint Response . . Emergency Repairs . !::WWfRtffi'0u~m";...... ...;... \ ....... . ..... . .c.,,,..:..... ....', .;,..'> -~~;' . . ."C; Source Treatment . Source Water Quality Monitoring . Distribution Monitoring: Coliform . RP pays City Lead/Copper . Disinfection By-products . RP pays City Investigation of Water Quality Complaints . Main Flushing Due to Water Quality Complaints . Disinfection of Existing Facilities . j(~~FJj~vOOjiOMENij}N:'E,P:J{ij-GID\:M. "\' ....;.... :'.'1 .;. . ,i. "-":;.?;: ;.' i......., Main Extensions . Replacement of Distribution Lines . Replacement of Transmission Lines . Other New Facilities, Including: . Storage Tanks . Wells . PumP Stations . @lVrI:NLlSm1JJME";';.. ". > ..... .....;. .>;.";': .....: ;.;.....;.... ...... ..,:,,;( Billing Individual Customers . Payment of Utility Taxes . Payment of Operating Permit . Collection of Connection Fees .. . . II .. .. II . Water System Description 1-12 2005 City of Bremerton Water System Plan Table 1-5 U.S. Navy: Shipyard and Jackson Park Water S stem Contractual Responsibilities Activities By City PSNS DOH ID# 03468C By Customer Other WA'FER: SYS'FEM'PLAN. .-'- . i . .. ..'. .. '.. JI , .' Population and Demand Projections . Financial Plannin~ . Capital Improvement Planning . Operation and Maintenance Program . Emer~encv Response Program . Water Conservation Program . . Regional , OPE.ffi\rtONS~x:NDc'l\OO::NtENANCE ::. 'ii. ,,". ....':.. '" , . i' >..':...."'.::..,...~ . .':' '. . ;':::.:' ..... Routine Main Flushing . Hydrant Testing and Repair . Cross-Connection Program . Backflow Prevention Assembly Testing . Disinfection of New Facilities . Customer Complaint Response . Emergency Repairs . , . ,W*~E:RiQUAEF:tyr;i,;: / .,...;:'.":C:::':;'..}.\.;.:,;.;.....:., '.,! ;.' J, .... ,,'::.i;;. '.../'i:';.....".....r " .'::..... :.'.,,0:.,.'. ... Source Treatment . Source Water Quality Monitoring . . Distribution Monitorin~: Coliform . Lead/Copper . Disinfection By-products . Investi.e.ation of Water Quality Complaints . Main Flushing Due to Water Quality Complaints . Disinfection of Existing Facilities . .:€~f,t~~~k0ME1W::Njj~~I{()G~~;;rj'/,i; j;;t~:,:,t\;~;~!i~,:~; ~:~~;( }~i,$~~t~~:~~t, 7~~:!~~,;'ii~\; {: "; ~;::;',?:~.~i~'~,~:J{!iJ ;/F11h~t:~.)=~~~1:~:;n:r\~:~s: t~~ t:~):~~~:~'.;{f~\;-i_:;:.:; " ,~. '::':Tii\,/;:,'i:2}:~ Main Extensions . Replacement of Distribution Lines . Replacement of Transinission Lines . Other New Facilities, Including: Storage Tanks . Wells . Pumps Station . .:ADMINISfflMj;m~;:,,:',,: " :.'0,..... " .,':: .', , ..,.,,:::;.: (,!;\',i";/",:': \",,":>:,:"., '(';.;.'i, X :':;i: .7 '.'. J . Billin~ Individual Customers . Customers on Navv Property Not Billed Payment of Utility Taxes . Payment of Operatin~ Permit . Collection of Connection Fees: N/A N/A Water System Description 1-13 2005 City of Bremerton Water System Plan 1.6.2 Service Area Characteristics The service area is located within the Puget Sound Lowland. Geologic uplifting of the Cascade and Olympic Mountain ranges formed the Puget Sound Lowland. Erosion of these mountain ranges deposited sedimentary materials in the lowlands, and glaciation carved the low rolling hills, scattered lakes, islands and inlets. The Vashon Drift, composed of unconsolidated silts, sands and gravels, was deposited about 13,500 years ago by an ice sheet known as the Vashon Glaciation that advanced from Canada. These deposits are as much as 3,000 feet thick and normally are divided into three units. The upper and lower units consist of glacial drift deposited by the ice or glacial meltwater and are composed mostly of layers of sand and gravel alternating with layers of silt and clay. The middle unit consists of a non-glacial deposit of silt and clay that normally ~eparates the other two units. The thickness of the upper unit is normally 200 to 400 feet. The middle unit ranges. up to 260 feet, but is commonly between 10 and 80 feet thick. The thickness of the lower unit is estimated to be between 2,000 and 3,000 feet. The topographic features and waterways are generally oriented on a north-south axis corresponding to the orientation of the Cascade and Olympic Mountain ranges and the direction of advance. and retreat of the Vashon Glaciation. Lands range from sea level to over 600 feet in elevation and include forested regions to the west in the vicinity of the Union River and Gorst Creek Watersheds. Bordering the marine shoreline are moderate to steep, irregular cliffs carved first by glaciation and then by erosion. Steep slopes also border the numerous small stream valleys that were the sites of glacial-melt water streams. The average annual precipitation vanes, but is generally between 45 and 50 inches per year in the City and about 60 inches per year in the Union River Watershed area. 1.7 Service Area Policies Bremerton has a legislatively-mandated "duty to serve" within its water service area, as designated in Figure 1-4. Section 3 describes how Bremerton determines adequate water capacity to serve additional customers. The Bremerton Water Utility procedures for processing water service requests are contained in the Kitsap County Coordinated Water System Plan (CWSP) and the Bremerton Municipal Code.F ollowing is a summary of adopted policies/ordinances relating to the Bremerton Water Utility service. 1.7.1 Kitsap County Resolution Adopting the Coordinated Water System Plan Resolution No. 090-2005, dated May 9,2005, adopts the latest update of the CWSP. The first CWSP was completed by the Water Utility Coordinating Committee in 1992. The resolution was adopted subject to a specific purpose, goals, and policies. The purpose of the CWSP is to maximize the efficiency and effectiveness of water service in the County by defining service areas within which utilities accept responsibility for providing service. Goals and policies set forth pertain to coordinated planning, water supply and distribution, planning and design standards, and appeals. Water System Description 1-14 2005 City of Bremerton Water System Plan 1.7.2 Bremerton Municipal Code Regulating City Utility Operations Bremerton Municipal Code (BMC) Title 15 regulates City Utility operations to provide continued safe, reliable utility service to City of Bremeron residents and those non- residents the City agrees to serve. These utility operations are water, wastewater, and stormwater. General Utility provisions are listed under BMC Section 15.01, and Water Utility provisions are located in BMC Chapter 15.02. In summary, Title 15 includes general provisions such as operations, utility service agreements with customers of the Utility, conditions of service, penalties for false information, developer system improvements, system development and construction standards for modification or improvement, and utility permit requirements. The authority of the Water Utility includes adopting, establishing, and enforcing standards, rules, and regulations; developing and implementing comprehensive planning; recommending rates and charges; and providing utilities and contract services. BMC Chapter 15.02 includes subsections concerning development of a water system comprehensive plan, service availability, service beyond city limits, construction standards, abandonment of private mains, private pressure adjustment, hydrants, irrigation and fire service metering, service connections, connection size, meters, backflow and cross- connection control, water system operation and maintenance, interruption of service for emergencies, abatement of nonconforming unauthorized or unsafe conditions, cross- connection control inspection, meter operation and maintenance, excessive consumption, waste of water, prohibited acts, assessments, rates, fees and charges, billing, and appeals. 1.7.3 Outside Service Area Policy The Outside Utilities Agreement is a recorded document which must be executed prior to providing water service outside city limits and is an element of the Bremerton service area policy. The BMC requires property owners outside the City boundaries not to oppose annexation to the City of Bremerton as a condition for receiving City utilities. Potential outside-of-city customers who do not wish to support annexation have the following options: . Drill their own well in compliance with County requirements, . Be served by another public water system, . Construct a new public water system operated by an approved satellite system, management agency according to the rounty Coordinated Water System Plan policy and state regulations, or . Not proceed with a proposed water-dependent development. 1.8 References History of the Bremerton Water System..John Short. 1962. Water System Planning Handbook. Washington Department of Health. 1997. Water System Description 1-15 of Bremerton Water S stem West Side Overview IWEST 440 ZONE I LEGEND ~ Raw Water IIIii After Treatment D Future or Off Line !il Pump Station (PS) IQ] 800ster Station (8S) ill Well(W) IWEST 650 ZONE I McKenna Falls Intake 395 It 01 I W440 I W256 - . Zone Intertle To East 240 Zone ~ ~ 16531 160 It I wen lR I 99 ft To City of Port Orchard figure1-2a Water System Description 1-16 Citvof Bremerton Water System East Side Overview From. West 255 Zone l~ fPS1il ~ Figure 1-2b I EAST 398 ZONE .1 Res 19 239 ft I EAST 490 ZONE I Res 16 239 ft ~ .. E398 I E240 Zone I"tertla EJ 01 EAST 240 ZONE I LEGEND I!!I Raw Water l1li After Treatment o Future or Off Line ~ Pump Station (PS) ~ Booster Station (BS) m Well (W) - 1m Well 9 00 200 fl ~ Well21 152ft Future . I ,~ [PS11l ~ Water System Description 1-17 l~' lU -r--~~' ' Ui ,- .... ; I-L /" { I LJ I I 14 +1 r 9 - ,.,. ~\ ~y ",>,".,. - .......-~ y~ r ) I I 1--4- h ~._ -il. J 1~\i1::{ic;S;~; -~) ,'~ .",' (, ", h_~ ~. c' Ai ---: )~F~}, / :' ' ,""""~'- ,/ ,\ ',:;/~";,. I /.::;~'S/,;.{ I ,," \ ",' c' ">.~,"" ,',:' \, .::.;:};,~~:?; ',~ :.~: - 9 t~"\ -1 tJ i, i "\ I J " i _ , I \. I,' ! 1 I I i (" " I N..}., r-"-r-".'--:i \_._~~ ~, ' j I .! I 1 r--r-r, ' ~..J f C ~ --- Y"-'~" -DQP' '" -'~-", --~ ."" . - , ;, ' ",_. I" ! ' -, ,- ~t....._-- : - - - . -- . - - -. - ' , ' . :....' - . "i.: \ \ ., - ir-- [ I r1 \ Pt2 i j I :t. .... " ~ 1 I r . ~ L_---' J- ~"'l1 , f--- I - - ,__h L I , / ! Yn~ if I) , , ~ '," ",i II "':""~ ."";c_ > . , "I \' I I j I I I ",,' I , 'L_L._~.".~ , 1--.-... ~ I ; ,.----.-.,...--y-i.~ i I- \ J' , I '''''' !,_ ~_ i ~ I iftl/ltiift, , Ii! ~ i? , , ) ! I I :"~_'''''-' i ! _LLLL.L':'_L-r--'-__'~! i l- Ii- " --r-- \ !i fl~~l .: \ ~.-i(Ir 11 ! :, I' /'--1 1 ~ ! ,.... I ~ i! . 1 '-' ;" ~ \ ,L., ! ; "', -,"' -- i ~ i -1 f i _ .,"'"--:w ,,' ",,~~,...,~,..~.,~ ,-...1. ~-t.-+ r--r-(\Uf4{ i-'''? '; ~',_ i 'i I I ,\ . 1 f,l \ I \ III ; ;t'~<"4 ~ ' , , I ; -/ .,.,_ ", , c '~, F! ~Ll k"'''\ ! f -; ~ L~ Ll r to';> a j ',;1'1 ' , , 1 I ''''O~'_~'^" i.. l ' -, "'-"1 .... '/-f' ~,L-=j ex'..l I ~l Ii J-' r: Y i bP~(, I, ,) '-~,'~~~-,~ ',J ,'.', ~ It . \ , -fJ...t ~I -I i I ~W' ' ! -W,J, ~ L-," ,j...,~, i ( I ~/ j'IJ.--,! ",.::~_l:o.L_-L~ Lj-+1J . ,! ~-1 ,----".." ' 1 ~ k. ~ : - ., ~lr/'....\~ f"._J, (,1\//11 L-.... l '"I I ! " " .....u t -L~u t~,l' l~ I r rr, r I' ! I f i J ! i l " \ I, I, ' 1 I " . , . I ! !, i ~ ' . r -I> \ " ,I J I OtlJ{~". I \ ~~ ,..J. 1-,L-1 Elf ....... · ~i.j 'f"'lr_o,' i ~"-'~ \ i ) IJ ! ~l~' )" ; \.~ r--~'""----i , ~" \ '" ~. < ~~~, ~ .?,~:;q;r~f~~~ata\Ca~UR!~:~:::r~~!~7~W,~~~t~~~~ r-----. i ,--,_.-.~ ~...._._../ A' .~~.-- : ! ~-~._-_._-- V'- '" i'--L; <;.r ~-<! ~L~ .. ~- ....huj Legend Water Mains Water Facility PressZone Size of Pipe ii:l Booster Station liE 240 Zone - 0 . 4" is) Corrosion Control Fac E 398 Zone - 6" ~ Pump Station 11 E 490 Zone -8" ffiTIWlter ~W256Zone - 1 0".12" i!~ Right of Wly W 256 Zone Boosted -16" T~-..~~ I ! " /' i. I! ~.__,~./ ~, ~ . I . \_.v. 1 ~~ ,~:J. d ~ lj i"""_+"'-T{ "1 r- , u I., € \j I' i ; J ~i~ il~/} 'I . i 1 ;"i V: _// J. <, .r A,G ,. -. ~ r . ,_I.-~?" . t j ~ .. : ~~ v f~'r'-'--"r-~"i 'f ,;,"" I 1-j i ~.. -; ,/?" ~ iI' l;,' ,~, f i I! f...", ,L,...Il,.._.L~"~~~...,,,.~_~,_!.=~.__._~"'P">"' ; I 1 ! i 11r--,' i I j 8 h < , c ~ !; -<~4 ~ r--~ t f'=t- t===:=i l -18".20" -24".36" ml W 440 Zone IIw 517 Zone mW 580 Zone W 650 Zone ';':, Wltershed , < @~lIs . Reservoirs Water Valves ~ PRV \ \ '&~~ - ( i ! I I I ( \ --1 I ~ I - i . --. I~ r;....... .~_._.__> '-;'~~~=~J-~' '- ( , "J Legend Water Mains Water Facility PressZone Size of Pipe g:j Booster Station ~ E 240 Zone - 0 - 4" G) Corrosion Control Fac E 398 Zone - 6" ~ Pump Station II E 490 Zone - 8" I2i]VVater . I W 256 Zone -10"-12" ~ Right of VVay W 256 Zone Boosted - 16" V:'i W 440 Zone IIw 517 Zone Ii W 580 Zone @ I/Iklls W 650 Zone . Reservoirs VVatershed ) ~ PRV Map Documen~.(i:\GIS:(fata\CatiaR R~esi-VVater system\~terSystem1"'()6.mxd) 113012006.-.~:57:~3 AM ""","-> J I () ~ ,) ~ ",/ ~ ---. ~--,.~.... \,j pJty of Bremerton // Water System // 'J FIGURE 1-3C ~ Le~end J / Water Mains Water Facility PressZone l f I / Size of Pipe ~ Booster Station E 240 Zone ;.j;~,/ ! ./ /" - 0 - 4" G) Corrosion Control Fac E 398 Zone i , / / / - 6" ~ Pump Station II E 490 Zone /'./ l - 8" [ill Wlter II W 256 Zone ./"../ , -1 0"-12" ~ Right of Wly W 256 Zone Boosted "..- _<;i' 'l'~ i-"/ /'<"~l - 16" tt? W 440 Zone , f' ~#'~' / '-. ~ r'<,w<_.\<_w") -18"-20" IlW517 Zone .1 j . .. l '...",j"-- - 24"-36" I !I!llI W 580 Zone y I 'i " @ Wells W650 Zone t ~ p} f \. \ '" /'" 1 . Reservoirs Wltershed 'l',. h-_V ,.!-""...." "- "('" /; ,; Water Valves \ ,'i / <!. PRV ;ry'..,..~:" i/ ,,/ ~l-/r \1-, ~')""r_...L..".;;p~,r ,1 I i I J ,t Map Document: (T:\GIS-data\Cahall Request-Water system\'AtlterSystem1.06.mxd)~ 113012006 - 7:57:53 AM ;'" ~ " ;ii)ffi11 t=t :=;= ~~~" , U\., I , <-~~~- . sAy ;~ :-H- .,-:: , , ,~'IrrlL 'I. ~1b-I~H-.'.';"":,'::".'. '..':" ~[ "cttI' ~ I I ", 'c~.i+F -=r " !I II " ==::j ITJ:/: ~" ~ '~II ll' =t '~~ ~ !lJ 'W ,: ~ ~i ~ n ~II.-< M:,1i ~",'~ IIU,' 13' _ '" d~ __. -KIahapie I , I 1/ \ h tti. I ~ I I ~tahUYeh lake ~ommunity Club ~:h 1 ~ ~111!m]_~t 1/ I' 41 II!#' I I w 1-.' .~~ ~ I-.F:l/ " J!j <<-~ ,1 // l:.~~'. 1 "".~litf~ [ .".....1>,11 : 1 I '=nn-iH tr,~-+1~ ! I fij ---' 3.~. I' ...., Ilil I -, "'II' , I ~plll~I): ;,",;~ ~~ ! : ! ; imTIrt .'.. r----:!t::';;;ili ", W illJ )1 ;---;1111 I il:~ i r!r!:~ !; Hi! _~ I!,; j i h~,:,1 'f:::L~~ ~ !PII'-i!! '\ " ! I I i I ilL ."u n I'~ c,_, 'I" o -< (n (j) ~ ~ ;>. CHICO ',- fTi,IJ!ri4.\ li~i~,_')'i I' J' WJ I i I.n,," .. ...., J--!-J. '1ii , ,'-w,' ", u.uJ ' kPJn.Sl;,; I;'-! "I[ ,/ UII~~' \ 0'"--1' y,,' :--:t),j7'i<. I , ' " I " J c:;--cl,' -" T ~::::_""'- i 'Y \ '2:h; I \ i' ~ liil[i.Ii!Ii;-L!!.j;/,""'_ -;;;V' ' 'U' ' , I \! ~ 0 ~..I c): I i f-ti!IWllli",ill, I ::::::R i Iif\4i'~ ' , , U ,'I /: .i ~ ~ '/1 I ,r::::t-'++'L',; ~,''' , ! , ! I "'''fu''!': It '",' , i ;: w,+'n' , I . I, .11 ,~-~I ! ! :---HIJ l;rH+< ; '. -. r ~, t: ~+;J i !TT!i~, I' '_'~; ,,"u,'~' ! I i ~~:p~ i; ! h I I!! I Ii : ! i I ~ ii'! i I' "I' , ! i ' ! ~-,--,--r+H ~LH'-l i' " , I ~ ~ili!i, :, !If---' I II I , ~ l'i'l ilili!~-j L I I I 1!!I4--,h-/ 'U i! i, :';':' I I I I -J :!' i,l i '...------r: I I! I l~ I I I i I i !TlI'~t' I ' I I I I I I ! I ; t~ I I A-JI ~ -.L.J : ,i i I I I I I=,,,, ""i ' , CI I I IH 1-I:IIfrn ~ rt- I I I ~Ii 1=11,1 I~H' ; i : ! f-c-HIIII" I HL 'u 111::r I I I I '1 (i I :1. )) n City of Bre[llertW ~ .1 L // ; [. I ,--, , I : I" "-- " ~- I ~ I - ~~ .." ~ !-i-i+i ~h~'1 I I ill'~: -if ~ I I ~~ ~ fili' 1l1L.::, "'1 I I 1I~ Jl V /II il I 1-",' Ti, I 't / liFT I~)< H:::::L,y:' "I'I'~ /,' N \{ ts= I f.- f-H CJ , " H- K' ';H I\- ~'=- I ' ~'. ,I ;--,-:jGi0:', 'rk. in' " , ~:+- f+ ~ m !? '~ I-f =--:0 ~jc I .r= , ' -.J / H-- ~~ ~~0 (~ I [i::t~d ',~ III I I ~C\'tJ-i ,Cf: ~';1-- < ill , ~i~_b ~I ~'> ,,:f~~II!I'-/~ N\\ ~j I:~:~" ,~ i;=j d/T J/ :Y BH~' " ~~ ,I ~// ,r';1 f-PVTY\ d6~ \ ~2c " b-i-----' , I I I'" PI ::i.4\:O.---i -, I ',I " I 'u~ ' ,f;t', I ,lrLJ 10 \ I '< I till1 I'\~'~~ 0' ~: I '~, " I M---1]=~' ,;' 1-,- , I ,~ ,'~' _ --+---1 I '=- ---q f ~--RT --1 V~ ,/tk '~'II ' ~~ === .' or..", 1,'- , i i -t:u-=~ty,:!Qmoil[Q1rcl'1 ==;~" " n latibn'''-j , _~~I ~_ II ; ~~;'~d(~i~~~eoG ":l-~~"-~ i-l:l-lLLU:: I I I ,I 111----, ' '1' \\ ,_---.I, ~ \ I L.. ,U I_I ! I i I i '~.flD-, Ic\~'-'" ',' --~ ~~-' " -----.L __I 1=r::.:=c::J I I I ~.--"j tj, ':~" '"- I 1 L_!-----1----------.l-~1 /-~ I~I ~- -r--h:-~.- -L,~t .~ ;:r+-L-+--- ,i --l I , I ~,_L...J I/'-----r--t=-r-,: 1~1 I I ~~ - '-\T - ~,-t= -':.-.y-,::::q~ p;J-J-= \ I LL_LlLt I ! :yj I ',I - ~' , 0 tL Cri ' -;0; R=i=q--- -,--; '::=L = I illl1111111 ~!~ r;./' i :I~r ~ ,It :NU'ii~~t-f'r= ~~H II' ! I II l-t-rl' i I ~ ~.-J TTZ'" '--.1\ '3::r.r-~Wl ~::;:Etl@=-~,=-~gt --'-.0,' ~-,'" " :r81'''' ~ I Iii --.J.....J I I' qy,,,-.>) --LL!0' !/ / =c, 'ri-==:=;r.-:=;:!'" c, I C I !T ; I I I , I I ! j : i i I I i I r-:-i " ' " .I -;" --,l.U..' , :' nlTITlll h-ri-ri I ;;;r I H ,tL i BAY 1(11~ J ~ OSTRICH BAY ... >0", .~~~.\ fauo' "und~ "ava -: I u I~~ I \~\..~~ '\i ~\C\J'-\R S\\" r' )j~' f:LH I " tB-r-8d;' HilI BURKE BAY A Q:J'" ~ ;?:-'" ~ ,,0 ~ ~O . . -./,. , '" c o I I'l! HlfBai~e I~~!-u\ t :, ~ :_l i;-++-n LI~. ' ~~:'-~~\~ll! \ i I!~ '-' ~ el j _I t -i if 1::---: ~' rl'l"" , '" 1" I I , .. f' ~-fi~'1 ~., _ ~I 1111!1 U1!-,,~ ~',,--....'----II j ~,; mel ': " ',\ I " ~ ::rJH-I 'r~-<lI'" ~ :l'~ en;, n\, >- -< (]) o a:: -< I o a:: o f- a:: o Q -<- ,?-,G -. ".--:;.: ~ " ""- ..' ':?' ':;oJ ,l'" " I' , ",~ I~ ''i! -;, l1111cDl 4:~ '"' ',"i."" 1 ll"".rl~ :1+:1-:" I Illi ~. w' " --W Ii-' ----+-:--i I -0 '70' ~ Q~ CLAM BAY '~j " U,S, Navy - Manchester Fuel Depot YUKON HARBOR ",.' rc -Pi .. ",Ii 1,10 I:'~~ tt:lC ~l,*::~~:lj~illl " ,t;i;~ . -.' L~VWAWater. L 1"11 ,: ~, ;",: ~ .)!Jil~;@:P Southworth r-g~ I 'Jilll~ ',5~'i:":Jl! 'T'= KPUO, 0-i I I, , Driftwood Cove :,-.LU1l11 -~ I.II! ~~I ", I IT,!: I F ,~ Frl--l i--rt-'-rj1kJLilj;iE---r~ fWQ-~ci PJ;;f--=:<-'-O ~ ~= ::t:: t~ C ~ ~ ; r::j I I !illIl ..;--~"\- In'- ' I:; ;-iil ~ i ,L ~ . ''':'',~m.LlllJ-II''L ,I , _, · ' ~ ~ :,_,,,~41~~'#:~i:: & 0' <%1 n"" MURDEN COVE .lXm '\ C.O.B.l.. Rockaway Seadl r I1A,RaOR ',' '; ", \, ( ~ KITSAP COUNTY WASHINGTON Coordinated Water System Plan City of Bremerton Service Area Legend CWSP Service Areas 2005 Water Service Area Type DCity D Federal - Navy I Tribal D Kitsap PUD I~I Northwest Water Systems I~I Other Private ;:::;::;;-;::: Uncontested Overlap D Washington Water SelVice Company I\",;'.~I Water District I I Satellite Management Area C.W,S,P, Adopted May 9, 2005 (J,V Map Created May 26, 2005 ~lF- '" q; Lambert Conformal Conic Projection North American Datum 1983 Spheroid: GRS80 State Plane Coordinate System FIPS Zone 4601 Washington North 8' o 1.350 :>.700 - - 5,= 8,100 ""'" '''' General Location of View 'Within Kitsap County City of Bremerton 2005 Water System Plan Figure 1-4 Kit,s~p pun "___~~40.~~ Kitsap Public Utility District P,O, Box 1989, Poulsbo, Washington 98370 (360) 779-7656' FAX (360) 779-3284 Product of Kitsap P,U,D, Geographic Information System 2005 City of Bremerton Water System Plan Section 2 Planning Background Information 2.1 Existing/Future Service Area The City of Bremerton Water Utility serves approximately 57,000 residents in its water supply area, which includes the Bremerton water service area (city limits and portions of unincorporated Kitsap County) and other areas with service agreements. These areas were described previously in Section 1, Table 1-1 and Figure 1-4 (service area map). Continued growth is anticipated within the current service area. Approximately 90 percent of the Bremerton service area lies within an Urban Growth Area (UGA). UGAs are specifically designated for growth at urban densities. Service areas - both retail and wholesale - are determined through a process described in the Kitsap County Coordinated Water System Plan (CWSP). Retail water service area boundaries are established by agreement between the water purveyors. Bremerton has service area agreements with all adjacent water providers with the exception of the City of Port Orchard, which is still under discussion. The CWSP provides the legal mechanism for water utilities to establish an exclusive retail service area. A designated retail service area denotes a specific utility has accepted responsibility for development of cost-effective and efficient water service to accommodate the future growth these areas will experience. Growth management objectives established for these areas must be accounted for in each utility's approved Water System Plan. The establishment of retail water service area boundaries carries two obligations: 1. The county and state governments recognize an identified utility as responsible for providing all retail public water service within a designated area, and 2. The designated utility shall assume responsibility within its service area for planning and implementing water system development and proper utility management. 2.1.1 Bremerton Service Area within City Limits The entire City of Bremerton is within the "Bremerton UGA." Although most land within the City is already developed, Bremerton is planning for significant growth through infill. The City of Bremerton 2004 Comprehensive Plan lays a foundation for an increase of about 12,000 people between 2004 and 2023. The Comprehensive Plan proposes changes iIi the comrnunity design ethic, as well as emphasis on regulatory incentives. Bremerton is anticipated to attract a larger percentage of the population growth than in the past. The Comprehensive Plan's key urban design model is "The Centers Concept," a mixed-use urban village approach to planning. Population growth for the City is largely calculated on the ability of strategically-placed, mixed-use activity centers to attract new residential, commercial, and industrial uses. Planning Background Information 2-1 2005 City of Bremerton Water System Plan Approximately 58 percent of the City's growth is expected in the new "Neighborhood" or "District Centers." Bremerton will position itself to attract development requiring the modification of existing zoning categories to provide sufficient industrial, commercial, and mixed use lands for business opportunities. The "Centers" approach builds on the City's initial focus on the Downtown Regional Center. Initially, growth will continue to focus on urbanizing neighborhoods on the edges of Bremerton. This pattern is most evident along the Highway 303 corridor north to the Silverdale area. In addition to Bremerton's Urban Growth Area, the City recognizes that its long-term health is tied to a larger area of interest, identified in Figure 2-1 as the Eventual Growth Proposal Map. Existing and future urban areas in Kitsap County, under growth management precepts, should be associated with a city. 2.1.2 Bremerton Service Area in Unincorporated Kitsap County Much of the unincorporated part of the Bremerton service area has experienced significant growth in recent years. This trend is expected to continue into the future, particularly in those portions within a UGA, such as: . North Manette Peninsula - The area north of the city limits and south of Waaga Way within portions of both the Bremerton East and Central Kitsap UGAs. . Sherman Heights/Navy Yard City Area - An area south of the west Bremerton city limits and north of Gorst, which is within the Bremerton UGA. . South Kitsap Industrial Area (SKIA) - The Bremerton National Airport and the Olympic View Industrial Park are designated as a stand-alone unincorporated joint planning area. e Gorst - An existing commerciallindustrial area at the head of Sinclair Inlet, which is designated as the Gorst UGA. 2.1.3 land Use Figure 2-2 shows comprehensive plan designations in the Bremerton water service area indicating what type of development is authorized for the property. Excluding the City's watershed and utility lands, a breakdown of generalized future land use categories follows. Approximately 54 percent of the service area consists of urban single-family residential land use. Roughly 1 percent of the service area consists of single-purpose multi family residential land use. Twelve percent of the service area is designated for mixed-use commercial and residential "centers" land uses, and an additional 5 percent is designated for single-purpose commerciaL Industrial land uses comprise a total of 23 percent of the water service area and open space and parks make up roughly 5 percent of the service area. Industrial areas include the greater South Kitsap Industrial Area (SKIA) and the Puget Sound Naval Shipyard. Planning Background Information 2-2 2005 City of Bremerton Water System Plan City of Bremerton Eventual Growth Proposal 2004 Comprehensive Plan D Bremerton City limit o Eventual Growth Proposal ~~, Roads ,I (~i f-;~~;,/ ,/ /j:f;~> l~" ;7' (;~ J "d.') ;' / /:;1J~, ,f I f ~. , I~~_~A-:;'~ : I A-,~~;~fk .Fi \ ~L!,i . ~i-T-' ( ~--.-.-,.(1 trf r.... I )1 .) J ,"'O...L-__.L.LJ ----,n:- -~- ~ j I-r- f "___1:;", lJ! ~ I 'I ~/ ~~~~f"lp.)n~~}Tt3~U] __-:,/ .1'r'JL'~'-, I, I,ti :J-I['~/',r'.,' c-c, -_c_!',\1~~i~:,,~tttLI7;f~~ , /- .' 1'::;1 :r!_~I;"!1 iF J -' ._./ ,L_~:LF.tD. '~-~1=-lr*1~--L1~,i~:- /.~n "nJ "1 T".nj n_ ""'nl , 1 . y~1~~_'/[~j1,r~fTlrJ " j ,J'..I..n, '-T~! ~,. L<~~~T..n~.' )e\'~~r~l!- ;; 4- i-m1 I '~-l F~\,~-1, I "i-, . 'I rr~ii"1~ T I~ ,/ l_~~_) I _ I 'i Ii. -T" , i ~S[J:J i~njJ :L:JJ jlm~t,,!;irg:HT~~~=~' . i i__I' rT~il~J~J},:~~r~ ,J . n, ' I -' 11.1 i I I' i ;7 /,' /5:-- /f " I L. _ 'i-~ " I ,i LJ 7t1 i~E, .. / i-------------.----1"--_~ -, '( j' L~-jj' Figure 2-1 Planning Background Information 2-3 2005 City of Bremerton Water System Plan City of Bremerton Land Use Map E.~~U::':'&oun<:'~f't LEGEND c:)t.S= .. 1'<~7~1~5"ltH _l..~~C",""nf"'~ L~l:'J~r.1" _~"\lUI:1.a';'" \/ ~ :J,....~ 1'!!'~l':or~ C~C<VI:ifi~:.;:v..nr.."i<llO!'IIl;l1 -~,.".= _H""""""" _ T~=r~.\,,"w"'+.;I'>ll:>J:;lt.:~~.. V~W~l'!..)t>.<<""rICOf;lQ(7 CqIr...1':)L3r:l& Opf~~!'3U IIIIiIII"QarVoelll;l"Co _"'Of.IE,,~.T.~"~ 1~I!N~~5L;oi>O""~":; _r_i)'t~1 I L_J / Neighborhood Centers District Centers Downtown Regional Center Reserve Center ~I Employment Centers ~;oo :!E~ - - ~700 Ft9I Adopted on 12/Q1/04 by Ordinance i'4917, Effective Date: 12117104 Figure 2-2 Planning Background Infonna/ion 2-4 2005 City of Bremerton Water System Plan 2.2 Related Plans and Requirements Several other existing plans and requirements must be considered in the planning of a water system in Washington State, as described below. 2.2.1 City and County Comprehensive Plans under the Growth Management Act The state legislature passed the Growth Management Act (GMA) in 1990 to require coordinated planning for projected growth in the faster-growing counties in the state. The GMA emphasizes control of "urban growth," including the type of growth, its intensity and location, and the utilities and services it needs. The GMA requires all urban counties and their cities to develop and adopt 20-year comprehensive plans, along with regulations to implement those plans. The plans must address specific issues, including but not limited to, land use, transportation, housing, capital facilities and services, natural environment, and economic development. The act has been amended in subsequent legislative sessions. The GMA requires local plans to be consistent with GMA requirements. If the comprehensive plan cannot show the provision of adequate public facilities and services to supply new development, the plan must be changed to allow only the amount of development that can be provided with adequate public facilities and services. Sanctions, including withholding of certain state revenues, are authorized for non-compliance with the GMA. Highlights of the GMA, as it pertains to water plans, are described below: . Urban growth. Encourage development in urban areas where adequate public Jacilities and services exist or can be provided in an efficient manner. . Reduction of sprawl Reduce the inappropriate conversion oj undeveloped land into sprawling, low-density development. . Economic development. Encourage economic development throughout the State that is consistent with adopted comprehensive plans., Promote economic opportunity Jor all citizens oj this State, especially Jor unemployed and Jor disadvantaged persons, and encourage growth in areas experiencing insufficient economic growth, all within the capacities oJthe State's natural resources, public services and public Jacilities. . Permits. Applications Jor both State and local government permits shall be processed in a timely and Jair manner to ensure predictability. . Environment. Protect the environment and enhance the State's high quality oj life, including air and water quality, and the availability oj water. . Citizen participation and coordination. Encourage the involvement oj citizens in the planning process and ensure coordination between communities and jurisdictions to reconcile conflicts. . Public facilities and services. Ensure that those public Jacilities and services necessary to support development shall be adequate to serve the development at the Planning Background Information 2-5 2005 City of Bremerton Water System Plan time the development is available for occupancy and use without decreasing current service levels below locally established minimum standards. . Capital facilities. GMA cities and counties must demonstrate that they can afford the infrastructure needed to support expected growth. If the services cannot be provided, the land uses must be revised or the levels of services (LOS) reduced. . Comprehensiveness. Comprehensive Plans must integrate planning for land use, housing, transportation, capital facilities and utilities. All areas of cities and counties and all plan elements must be addressed from an area-wide perspective. . Consistency. Comprehensive plans must avoid internal contradictions and must not interfere with the successful implementation of the plans of neighboring jurisdictions. Plan policies must be consistent with the direction established by the GMA, Vision 2020 and adopted county-wide planning policies. The GMA requires counties to establish "Urban Growth Areas" (UGAs) to help guide urban growth into the most appropriate areas and to reduce urban sprawl. Kitsap County has established several UGAs, including UGAs in the greater Bremerton area. Some UGAs are associated with an incorporated city, and some UGAs in the greater Bremerton vicinity are "unassigned." Unassigned UGAs are found north of Riddell Road in East Bremerton and south of the City in the South Kitsap Industrial Area and other areas such as Gorst. UGAs associated with the City of Bremerton may be annexed into the City at any time. Unassociated UGAs are intended for urban-style development, but are not as likely to be annexed into a city without prior association of the UGA with that city. The following identifies UGAs in the greater Bremerton area and their associations. Regardless of association, substantial portions of some or all of these UGAs will be provided water service by the Bremerton Water System. Greater Bremerton Urban Growth Areas: . Bremerton West - Includes unincorporated areas adjacent to West Bremerton such as Navy Yard City and the Sunnyhill Road unincorporated "island." . Bremerton East - Extends north of East Bremerton to Riddell Road. . Central Kitsap - Unassigned. Extends north of Riddell Road to the Silverdale UGA. . Gorst - Unassigned. Includes the urbanized area at the head of Sinclair Inlet. . McCormick Woods - Unassigned. Extends south of the former Northwest Corporate Campus to the McCormick Woods golf course and nearby residential development. . Port of Bremerton/South Kitsap Industrial Area - Unassigned. Extends south of the Bremerton Watershed to the Bremerton Industrial Area and Airport. In addition, the County has established several "Urban Joint Planning Areas" - areas designated as Urban Reserve or Urban Industrial Reserve that may be needed to support future growth. These areas will be subject to coordinated planning to determine how each area should be configured, designed, serviced, financed and/or governed. Planning Background Information 2-6 2005 City of Bremerton Water System Plan These joint planning areas are located adjacent to City of Bremerton UGAs and within the Bremerton water service area. Greater Bremerton Joint Planning Areas: . Port Blakely/ Kitsap Lake South - An area southwest of Kitsap Lake adjacent to the City of Bremerton incorporated Port Blakely properties west of Kitsap Lake. . Gorst Area Urban Reserve - Areas immediately west and north of the Gorst UGA extending toward the Navy Yard City. . West McCormick Woods - Areas adjacent to the McCormick Woods UGA to the west and south and extending toward the Gorst UGA. The GMA requires cities and counties to enter into agreements for ongoing coordination of their comprehensive plans. Agreements must specify how all major aspects of urban development will be managed, including the extension of utilities and other urban services. Under the GMA, the City of Bremerton, the City of Bremerton Water Utility, and Kitsap County must coordinate their comprehensive plans and water supply plans. In 1992, Kitsap County adopted countywide planning policies spelling out the County's intent to develop "Urban Growth Management Agreements" (UGMAs) with other jurisdictions to coordinate planning and growth activities within established UGAs. The City of Bremerton and the County have not yet developed an UGMA for the Bremerton UGA. To ensure coordination of public facilities, the UGMA will contain at least the following provisions: . Establish a method of sharing net revenues, services, and expenses (if appropriate) in annexations of significantly developed areas. . Consider pre-annexation agreement issues related to the provIsIOn of urban governmental services. . Designate level of service (LOS) standards. . Identify services to be provided in the UGA, the reasonable purveyors, and the terms under which the services will be provided. The City amended the Bremerton Comprehensive Plan in 2004, which includes a Capital Facilities Element and six-year Capital Facilities Plan (CFP). The CFP is a six-year finance plan that identifies expected costs and sources of funding for needed facilities, including water facilities. The CFP must be amended annually to stay in compliance with the GMA. Kitsap County submitted its Comprehensive Plan to the state in December 1994, but it was appealed to the CentralPuget Sound Growth Management Hearings Board and declared invalid in 1995. The County adopted a revised plan in 1996, which was declared partially invalid in 1997. This was followed by the most recent plan adopted in May 1998, and in February 1999 the Hearings Board rescinded the invalidation. Non- compliance issues regarding joint planning areas were resolved in November 1999 in all areas with the exception of the Port Gamble Joint Planning Area. The County's 1998 Comprehensive Plan was amended in 2002, 2003, and 2004. Planning Background Information 2-7 2005 City of Bremerton Water System Plan To be consistent with the GMA, the Bremerton WSP must address how the City plans to provide water to expected new residents over the next 20 years. The WSP includes a , ' financing plan for water facilities. Information from the plan will be summarized and included in the City's CFP during each annual update. The water financing plan will be updated annually, consistent with the GMA. The annual updates will supersede the WSP financial plan during interim years until the WSP is again updated. 2.2.2 Municipal Water Law In addition to the importance of conserving water for fish, growing communities, agriculture, and industry place an increasing demand on Washington State's water resources. To help meet these growing needs, the state legislature passed the Municipal Water Supply-Efficiency Requirements Act, commonly called the Municipal Water Law (MWL). The MWL amended sections of the State Board of Health Code, the laws governing public water systems, and sections of the State's Water Code. These changes affect the water system planning process, provide greater certainty and flexibility for water rights held by public water systems, and more closely tie water system planning and engineering approvals by the Department of Health to water rights administered by the Department of Ecology. The MWL allows for the expansion of the place of use of a municipal water supplier's water right to all areas included in its service area, as described in an approved WSP. Expansion of the place of use on a water right through an approved WSP now requires local government consistency determinations. Consistency determinations should reflect the water system's entire service area. The MWL requires DOH to ensure consistency with local adopted plans, regulations, and polices (including CWSPs) and establishes a municipal water supplier's duty to serve within its retail service area. Ensuring local government consistency is the responsibility of the water system. Sections of the MWL pertaining to water system planning are: . Municipal water supplier definition - Provides the definition of a municipal water supplier and establishes municipal water supply purposes. . Water right connection/population limitations - Clarifies the State's Water Code by stating that the number of water service connections and population are not limiting attributes of water rights for water systems that have a DOH approved water system plan or other approval that specifies the number of connections. . Plan review coordination between DOH and the Department of Ecology (Ecology) - Amends the State's Water Code directing DOH and Ecology to coordinate WSP approval procedures with water right determination procedures for WSPs. o Service area consistency - Allows a municipal water supplier to expand the place of use on its water right to all areas included within the service area described in its approved WSP. This benefit is provided if the water right holder is in compliance with the terms of its WSP, and the service area is consistent with applicable approved comprehensive plans, land use plans, development regulations, coordinated water Planning Background Information 2-8 2005 City of Bremerton Water System Plan system plans, and watershed plans. Place of use is not reduced if the service area identified in an approved WSP is smaller than the place of use in the water right. . Conservation requirements - Provides direction on conservation to municipal water systems with 1,000 or more connections. This includes reporting the conservation measures the utility has put into practice in the past and how those measures have increased its water use efficiency. . Current conservation programs and the conservation rule - Directs DOH to develop water conservation rules expected to be finalized in 2006 and to involve key stakeholders in the process. Municipal water suppliers are to continue to meet current conservation planning requirements and implement their current programs. . Local government consistency and duty to serve - Requires new services within a water system's service area to be consistent with applicable, approved local land use plans, comprehensive plans, and development regulations. Water utilities must delineate retail service areas in their WSP. Water systems with DOH-approved WSPs now have a duty to provide service to new connections within their retail service area. . Reclaimed water-Requires systems serving 1,000 connections or more to evaluate reclaimed water opportunities. 2.2.3 Other Related Plans Table 2-1 describes the plans that were considered while developing Bremerton's WSP. Table 2-1 Plans Related to Water Svstem PlanninQ Title Date Summarv Bremerton Comprehensive 2004 Developed to comply with GMA. Plan Kitsap County Coordinated The Public Water System Coordination Act of 1977 designates Kitsap County as a Water System Plan (CWSP) 2004 "Critical Water Area" and requires plans to maximize efficient, effective development of public water svstems consistent with regional needs for critical water service areas. Began in EHSB 2514 provides funding to initiating governments for WRlA-Ievel watershed Kitsap Peninsula Watershed 2000 planning and basin assessments. Kitsap County received a total of $870,000 to Planning (WRIA 15) Vetoed in 2005 conduct studies and prepare the plan. In June 2005, the Squaxin Island Tribe vetoed the nlan, which halted the nrocess. Water Supply Plan for the 1999 Projects water use and capital improvements needed fur this area. South Kitsap Industrial Area Kitsap County 1998 Deve]oped to comply with GMA. Amended in 2002, 2003, and 2004. Comprehensive Plan Kitsap County ]997 Developed by Kitsap County PUD to evaluate existing data on water and assess data Initial Basin Assessment adequacy to make decisions about pendinQ water riQht annlications. Water Tech Memo #2 Kitsap 1997 Projects water use and capital improvements needed for this area. Lake Technology Park Kitsap County Groundwater Vol. 1&11 199] Provides an analysis of groundwater related data in Kitsap County, action Management Plan Vol. III & IV 1996 reCommendations; and supporting documentation for protecting groundwater resources. Bremerton Gorst Basin ]996 Describes the hydrogeology and hydrology ofthe Gorst Creek drainage basin. Study Bremerton Wellhead 1996 Delineated ]-,5-, and 10-year time of travel protection zones for City production Protection Plan wells. ,J\..djacent purveyors' water Various Includes WSPs for the City of Port Orchard, and the fol!owing water districts: Rocky svstem plans Point, Silverdale, North Perry Avenue, Erland Point, and Sunnyslope. Planning Background Information 2-9 2005 City of Bremerton Water System Plan 2.3 Population Estimates for the Bremerton Water Supply Area The residential population estimates for the Bremerton water supply area are presented in Table 2-2 and Figure 2-3 and include estimates for years 2000 to 2004, forecasts for years 2005 to 2024, and methodology used. The forecasted population used for this WSP is about 12 percent lower than the forecast required for use in the 1999 WSP. The Bremerton water supply area consists of service areas requiring population information for: . Bremerton Retail Water Service Area - City and adjacent unincorporated areas . Puget Sound Naval Shipyard and Intermediate Maintenance Facility . Jackson Park Naval Housing . Rocky Point Water District Retail Water Service Area The West 517 Zone water system is not represented in this table, as it is designated a non- community system without a significant residential population. Water use forecasts for that system are discussed later in this section. Several areas of proposed residential growth in the Bremerton Water Service area include: Within City Limits: . Waterfront Condominiums (W256 Zone). - In 2005, construction began on 144 condominium units in downtown Bremerton. . East Park (E398 Zone)- This 40-acre area of former Navy housing was transferred to the City of Bremerton and sold in 2005 to a developer who plans to construct 425 residential units of single-family homes, condominiums, and apartments. . West Hills (W440 and W650 Zones) - Over 400 acres are planned for development into mixed use industrial and up to 450 residential units. . Sinclair llidge (W580 Zone) - This 188-acre property in the Anderson Creek area was previously considered for industrial/commercial development. In 2005 the property changed ownership, and the current plan is to construct a residential development of approximately 1,500 single-family homes. . Bayview (W580 Zone) - This 40-acre area is being developed for residential use. e Port Blakely (W440 Zone) - This 440-acre development proposes mixed-use with a projected 900 single-family equivalent units. Currently Outside City Limits: . Tracy ton (E240 Zone) - This 39-acre parcel was formally undeveloped land owned by the Tracyton Water District. It was transferred to the Bremerton Water Utility as part of the payment for assuming the water district in 2004. In 2005, the City sold the property to a developer who plans to construct about 100 single-family homes. Planning Background Information 2-10 2005 City of Bremerton Water System Plan . McCormick North (W580 Zone) - Approximately 1,500 homes are anticipated to be constructed over the next few years at this site just south of the City's property at Anderson Creek. Table 2-2 Residential Population Forecasts City of Bremerton Main System Water Supply Area Year Bremerton Retail Water Service Area Population Inside City Limits Outside City Limits Total - 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 35,103 34,009 33,184 33,289 32,078 34,431 35,002 35,572 36,143 36,714 37,285 37,856 38,427 38,998 39,569 40,139 40,710 41,281 41,852 42,423 42,994 43,565 44,136 44,708 45,208 13,211 13,246 13,282 13,317 14203 15,090 15,977 16,863 17,750 18,637 19,523 20,410 21,297 22,184 23,070 23,957 24,844 25,730 26,617 27,504 28,390 29,277 30,164 31,050 31,937 48,314 47,256 46,466 46,606 46,281 49,521 50,978 52,436 53,893 55,351 56,809 58,266 59,724 61,181 62,639 64,096 65,554 67,011 68,469 69,926 71 ,384 72,842 74,299 75,759 77 ,145 Population Served by Bremerton Through Contract Total Population Served by PSNS & Jackson Rocky Point City of IMF Park Navy Water Bremerton Housing District S ystem - 109 2,047 1,636 52, I 06 1,040 2,211 1,646 52,152 1,972 2,374 1,656 52,468 2,903 2,538 1,667 53,714 2,903 2,539 1,704 53427 2,903 2,903 2,903 2,903 2,903 2,903 2,903 2,903 2,903 2,903 2,903 2,903 2,903 2,903 2,903 2,903 2,903 2,903 2,903 2,903 2,540 2,541 2,543 2,544 2,545 2,546 2,547 2,548 2,549 2,550 2,552 2,553 2,554 2,555 2,556 2,557 2,558 2,559 2,561 2,562 1,740 1,777 1,813 1,850 1,886 1,923 1,959 1,996 2,032 2,069 2,105 2,141 2,178 2,214 2,251 2,287 2,324 2,360 2,397 2,433 56,704 58,199 . 59,695 6],190 62,685 64,180 65,675 67,170 68,666 70,161 7],656 73,15] 74,646 76,141 77,637 79,132 80,627 82,122 83,619 85,043 Population data supplied by the City of BremertonDepartment.of Commnnity Development with the following methodology: ]. Transportation Ana]ysis Zones (T AZ) data provided by Kitsap County, November 2005. 2. T AZ Single Family (SF) and Multi Family (MF) Households provided Jor base year 2003 .and projected year 2025. 3. SF and MF Households aggregated to total number of households per T AZ. 4. Single Family (SF) and Multi Family (MF) Households for 2000fromdata prepared at time of2004 Bremerton Comprehensive Plan. 5. Kitsap Household Size from "llIl1strative HOllsehold and Person per HOllsehold Projections Using the GMA Poplllation Projections: 2005 & 2010"CTED. . 6. 20] 0 Household Size for Kitsap County, from Alternative 2 Trended Headship Rates (assumed), see note 5 above. 7.2000 Historic21 Figure from TAZ figures used 2t time of Bremerton December 2004 Comprehensive Plan. 8. Analysis is different from 1999 WSP, as PSNS and Jackson Park populations were included in the City's population. 9, Changes from ]999 WSP: Population for PSNS and Jackson Park now separate from the City's, and Tracyton now included in Outside City Limits, Planning Background Information 2-11 2005 City of Bremerton Water System Plan Residential Population History and Forecast 90,000 s:: o 80,000 +:l ~ 70,000 ::J Co 60,000 1 o 50 000 I. . . .. · a.. , ~II II III ~ 40,000 i ; 30,000 : :2 20,000 i ~ 10,O~: 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 .......... I ......a i ~.-~.-~-- ,,_"-./31 _ ._ -.- - ~- - _ IIIl _ lit - lit . --.--. -1IlI--~ . _. - -. _ _11- - B- -..-. IIIl -11--11 .--.--. __IB--IB--II-- I 8 ~-~-~ I i I I I __ Brerrerton Water Service Area History - - -8- - - Brerrerton Water Service Area Forecast ---.- Brerrerton Water Supply Area History - - -.- - - Brerrerton Water Supply Area Forecast Figure 2-3 2.4 Water Production and Demands Production is defined as the total volume of water withdrawn from surface water and groundwater sources for use in the Bremerton water supply area. Production is measured using source meters on the surface supplies and wells. Bremerton water production since 1925 is presented in Figure 2-4. Production since 1985 is presented in Table 2-3. City of Bremerton HISTORICAL ANNUAL WATER PRODUCTION 4000 3500 3000 1/1 c: 2500 ~ C'll 2000 (!) c: 1500 ~ ~ 1000 500 1B1~ 1~1~ 1~1B 1~1~ 1~ 1_1~ 1~1m1~ 1_1~ 1~1~~ Year Figure 2-4 Planning Background Information 2-12 2005 City of Bremerton Water System Plan Table 2-3 20-year Water Production History Total MG ADD MDD MDD Annual McKenna Falls Year SW % GW MGD Date MGD Rainfall Inches 1985 2894 1782 62% 7.93 Nav 29 14.95 36.9 1112 38% 1986 3074 2030 66% 8.42 Aug 9 15.40 67.2 ]044 34% 1987 3195 2068 65% 8.76 Jun 1 16.00 58.2 1128 35% 1988 3187 1808 57% 8.70 Ju121. 17.02 55.5 1379 43% 1989 3353 2031 61% 9.12 Feb 7 17.30 50.3 1322 39% . 1990 3335 214] 64% 9.14 Dee 22 20.04 71.0 1194 36% . 1991 3178 2148 68% 8.70 Jan 4 16.65 63.0 1030 32% 1992 3096 1546 50% 8.48 Jun 25 13.84 59.8 1549 50% 1993 2821 1320 47% 7.73 Jan 24 13.71 49.6 1501 53% 1994 3027 1805 60% 8.29 Ju122 15.01 74.6 1221 40% 1995 2878 1904 66% 7.88 Jull 14.48 82.2 974 34% 1996 2987 2097 70% 8.13 Jul13 14.06 77.0 888 30% 1997 2709 1900 70% 7.40 Jan 3 14.30 90.2 809 30% 1998 2894 1764 61% 7.90 Aug 14 14.32 84.2 1129 39% 1999 2982 1722 58% 8.17 Jun 19 13.46 90.5 1260 42% 2000 2964 1856 63% 8.12 Jul19 13.90 52.8 1108 37% 2001 2753 1336 49% 7.54 Ju112 11.57 64.3 1417 51% 2002 2673 1477 55% 7.32 Jul27 14.30 58.6 1196 45% 2003 2726 1463 54% 7.47 Aug6 ]4.50 74.4 1263 46% Planning Background Information 2-13 2005 City of Bremerton Water System Plan 2004 2804 1333 48% 7.66 Jul ]8 14.88 52.3 1471 52% 20-yr Avg 2977 1776 60% 8.]4 14.98 65.6 1200 40% Table 2-3 Continued Water demand is defined as the quantity of water drawn from the water system by customers. Demand is measured through the approximately 16,000 service meters located at each customer's connection to the City's system. All services are metered. Navy contracted meters are read monthly, and Water Utility personnel read the other residential and commercial meters every other month. Water demand information is presented in Figure 2-5. Average day demand (ADD) for the six years 1999 through 2004 is 7.7 MGD. In 2001, an extraordinarily dry winter necessitated activation of the City's Water Shortage Contingency Plan to manage the drought. City of Bremerton Water Demands 18 - 16 14 - 12 - o 10- ~ 8- 6- 4- 2 - 0- Qrnj,Jg ht Plan lmplerrenled 7-27-02 8-6-03 7-13-04 1999 2000 2001 2002 2003 2004 III ADD II.! MOD Figure 2-5 In 2005, Bremerton's water accounts were distributed into the following customer classes: Single-family Residential Multi-family Residential Commercial/Government/Industrial. Irrigation 13,070 1,884 1,407 108 Water use is presented by type of use in Figure 2-6 and shows six-year average demands by single-family residences, multi-familyresidences, commercial/government entities, and the Navy properties. Water use is presented by location in Figure 2-7 and shows six-year average demands within the city limits; in the unincorporated portion of the water service area; and in the contracted uses at Navy facilities, Rocky Point Water District, and the City of Port Orchard. Planning Background Information 2-14 2005 City of Bremerton Water System Plan City of Bremerton 1999-2004 Average Water Use by Customer Class ADD = 7.7 MGD Non-revenue water 6% Single Family Residential 35% Irrigation 5% Non- residential 12% Figure 2-6 City of Bremerton 1999 - 2004 Average '''''ater Use by Location ADD = 7.7 MGD Port Orchard 1% Non-revenue Water 6% Figure 2-7 Planning Background Information 2-15 2005 City of Bremerton Water System Plan Navy properties include the Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF) and Naval Station Bremerton, Jackson Park Housing complex, the Navy Hospital, and several other smaller accounts. The largest demand in the entire system is PSNS&IMF, which has an average water demand from 1999 to 2004 of 2 MGD, as shown in Figure 2-8. Navy properties account for about one-third of Bremerton's water demands. Historically, the Navy has had a significant effect on Bremerton's water system. It was due to increases in workload at PSNS and the resulting increase in Bremerton's population that water demands skyrocketed during World War II. This effect stands out when over 70 years of water production is presented, as shown in Figure 2-4. Within the PSNS&IMF the water uses are industrial/commercial (64%), shipboard (18%), steam production (13%), and residential (5%). The Navy is performing two studies concerning water conservation. First, a leak detection survey was completed indicating little water is lost through leaks (approximately 2%). Second, a water conservation study with the goal of identifying existing water uses and potential conservation projects within the PSNS&IMF is in progress. The Navy expects its water demands to decrease over the next five to six years and then to stabilize over the long range. Puget Sound Naval Shipyard Water Use 1975-2004 3.5 >. ~ 3.0 ~ 2.5 Cl.. ~ 2.0- o iii 1.5 C> g 1.0 :E 0.5 0.0 1975 1978 1981 1984 1987 1990 1993 1996 1999 2002 Figure 2-8 2.4.1 Maximum Day Demands Maximum day demand (MDD) is defined as the highest amount of water used in a single day in the calendar year. For Bremerton, these data are estimated using source production meters. Table 2-3 and Figure 2-9 present historical ADD andMDD. The ratio of MDD to ADD for the past six years ranges from 1.65 to 1.96, which is in the expected range for Washington water systems. This excludes the drought year of2001, which had a ratio of 1.53. The City implemented conservation outreach that summer, focusing on reduced outdoor water use. The result was a 17 percent reduction in MDD. Planning Background Information 2-16 2005 City of Bremerton Water System Plan MDDs generally occur during summer warm, dry spells when outdoor water use is highest; however, MDDs can also occur in the winter when customers let their taps drip during freezing weather, PSNS activates its freeze protection system, and line breaks are common. The highest MDD recorded for Bremerton in the past 25 years was 20 MGD, which occurred on December 22, 1990 during a severe cold spell. Forecasted MDDs are shown in Table 2-4 and Figure 2-9 and were calculated using a MDD peaking factor of 2.0 as recommended by the Washington State Water System Design Manual. This figure also shows the effect of further implementation of Bremerton's conservation program in compliance with upcoming state efficiency regulations. Planning Background Information 2-17 2005 City of Bremerton Water System Plan Single-family Multi.family Commercial Irrigation Navy Contracts Non-revenue Water Rocky Average Max Day Average Max Day Residential Residential Point City of Day Demand Day Demllnd Water Port Demand Without Demand With Year With Without With Without With Without With Without With Without With Without Orchard Without With Conser- Conser. Conser- Conser- Conser- Conser- Conser. Conser- Conser- Conser- Conser- Conser- District Contract Conser- Conser- Conser- Conser- vation vation vation vation vation vation vation vation vation vation vation vation Contract vation vation vation vation 2005 2.77 2.80 0.74 0.74 1.13 1.13 0.32 0.32 2.23 2.28 0.44 0.45 0.13 0.05 7.91 15.82 7.81 15.63 2006 2.85 2.88 0:76 0.76 1.16 1.17 0.33 0.33 2.19 2.28 0.45 0.46 0.14 0.10 8.12 16.24 7.98 15.95 2007 2.92 2.96 0;77 0.78 1.21 1.22 0.34 0.34 2.14 2.29 0.47 0.48 0.14 0.25 8.47 16.93 8.24 16.48 2008 2.98 3.04 079 0.80 1.25 1.26 0.35 0.35 2.10 2.30 0.47 0.49 0.14 0.25 8.63 17.27 8.34 16.67 2009 3.04 3.12 0.81 0.82 1.29 1.31 0.36 0.36 2.05 2.31 0.48 0.50 0.14 0.25 8.81 17.62 8.42 16.85 2010 3.10 3.20 0:81 0.84 1.33 1.35 0.36 0.37 2.06 2.31 0.48 0.51 0.15 0.25 8.98 17.96 8.54 17.08 2011 3.15 3.27 0.84 0.86 1.37 1.39 0.37 0.38 2.06 2.32 0.49 0.52 0.15 0.25 9.15 18.29 8.69 17.37 2012 3.22 3.35 0;86 0.88 1045 1.48 0.38 0.39 2.07 2.33 0.50 0.53 0.15 0.25 9.37 18.73 8.89 17.77 2013 3.27 3.43 0:88 0.90 1.53 '1.57 0.39 0.40 2.08 2.34 0.51 0.54 0.15 0.25 9.59 19.17 9.07 i8. i3 2014 3.33 3.51 0.90 0.93 1.61 1.66 0.40 0.41 2.08 2.34 0.52 0.56 0.16 0.25 9.81 19.62 9.25 18.51 2015 3.40 3.58 0:92 0.95 1.70 1.75 0.41 0.42 2.09 2.35 0.54 0.57 0.16 0.25 10.03 20.06 9.47 18.94 2016 3.48 3.66 0.94 0.97 1.73 1.83 0.42 0.42 2.10 2.36 0.54 0.58 0.16 0.25 10.24 20.47 9.62 19.23 2017 3.55 3.74 0:96 0.99 1.85 1.90 0.43 0.43 2.10 2.37 0.56 0.59 0.16 0.25 10.44 20.87 9.87 19.73 2018 3.62 3.82 0.98 1.01 1.94 1.99 0.43 0.44 2.11 2.37 0.57 0.60 0.17 0.25 10.66 21.31 10.08 20.16 2019 3.70 3.89 1.00 1.03 2.01 2.07 0.44 0.45 2.12 2.38 0.58 0.61 0.17 0.25 10.86 21.73 10.27 20.54 2020 3.77 3.97 1.02 1.05 2.09 2.15 0.45 0.46 2.12 2.39 0.59 0.63 0.17 0.25 11.07 22.15 10.47 20.95 2021 3.84 4.05 1.04 1.07 2.18 2.24 0.46 0.47 2.13 2.40 0.61 0.64 0.17 0.25 11.29 22.59 10.69 21.-'8 2022 3.92 4.12 1.06 1.09 2.25 2.31 0.47 0.48 2.14 2.40 0.62 0.65 0.18 0.25 11.49 22.98 10.88 21.76 2023 3.99 4.20 1.08 1.11 2.34 2.40 0.48 0.49 2.14 2.41 0.63 0.66 0.18 0.25 11.71 23.42 11.09 22.19 2024 4.06 4.27 1.10 1.13 2.42 2.48 0.49 0.50 2.15 2.42 0.64 0.67 0.18 0.25 11.91 23.83 11.29 22.58 Table 2-4 City of Bremerton Main System and Contracted Water Sales Historical (shaded) and Forecasted Water Use by Type of Use in MGD Assumptions: I. Single Family water use will increase at the same rate as population growth. New homes will be built with water efficient plumbing according to the federal Energy Efficiency Act. 2. Multi-family \vater use will increase at the same rate as population grO\vth. New units will be built with water efficient plumbing according to the federal Energy Efficiency Act. 3. Commercial water use will increase at the same rate as population gro\\1h. Additionally. the West Hills industrial area is anticipated to begin in 2007. and the Kitsap Lake industrial area is anticipated to begin in 2012. lnigation use will increase at the same rate as population growth. Na'\y industl;al use will decrease with implementation of conservation programs. Navy residential use will increase slightly with population. Ro-cky Point water use will increase at the same rate as population growth for that area. City of Port Orchard waler use will increase to the maximum amount allowed in the interlocal agreement. Non-revenue Water assumed to be 6 percent of total customer water sales. 4. 5. 6. 7. 8. 9. 10. Forecasted Maximum Day Demand is forecasted Average Day Demand multiplied by 2. Assumptions used to calculate demands under the "with conservation" scenario are described in Section 2.5.2. 2-18 Planning Background Information 2005 City of Bremerton Water System Plan Table 2-5 City of Bremerton Main System Historical (shaded) and Proiected Water Use by Type of Use in ERU with conservation All Units are in Equivalent Residential Units Rocky City of Total Single- Multi- Non Point Navy Port Average Year family family Commercial Irrigation Contracts Revenue Water Orchard Day Residential Residential Water District Contract Contract Demand 4~ 2005 13,850 3,700 5,650 1,600 11,386 2,212 663 250 39,075 2006 14,250 3,800 5,800 1,650 11,423 2,258 676 500 39,884 2007 14,600 3,850 6,050 1,700 11,459 2,332 690 1,270 41,191 2008 14,900 3,950 6,250 1,750 11,496 2,359 703 1,270 41,682 2009 15,200 4,050 6,450 1,800 11,533 2,384 716 1,270 42;120 2010 15,500 4,050 6,650 1,800 11,570 2,417 729 1,270 42,699 2011 15,750 4,200 6,850 1,850 11,607 2,459 742 1,270 43,437 2012 16,100 4,300 7,250 1,896 11,644 2,515 755 1,270 44,435 2013 16,350 4,400 7,650 1,943 11,681 2,566 768 1,270 45,328 2014 16,650 4,499 8,050 1,989 11,718 2,619 782 1,270 46,274 2015 '17,018 4,599 8,500 2,035 11,756 2,680 795 1,270 47,345 2016 17,386 4,698 8,640 2,081 11,794 2,722 808 1,270 48,086 2017 17,753 4,797 9,250 2,128 11,831 2,792 821 1,270 49,326 2018 18,120 4,896 9,700 2,174 11,869 2,853 834 1,270 50,395 2019 18,486 4,995 10,050 2,220 11,907 2,907 847 1,270 51,358 2020 18,852 5,094 10,450 2,267 11,945 2,965 860 1,270 52,374 2021 19,218 5,193 10,900 2,313 11,984 3,025 873 1,270 53,442 2022 19,583 5,292 11,250 2,359 12,022 3,079 886 1,270 54,404 2023 19,949 5,390 11,700 2,405 12,060 3,140 899 1,270 55,472 2024 20,296 5,484 12,100 2,449 12,099 3,196 912 ],270 56,460 Planning Background Information 2-19 2005 City of Bremerton Water System Plan Table 2-6 West 517 Zone Historical (shaded) and Projected Water ADD in MGD Water Use Within West 517 Zone System Water to Other Systems South Kitsap Aero Mobile Total West Total ERUs Year Commercial Golf Course Industrial Total Intertie to Estates 517 Zone West 517 Zone Irrigation Area Main System (Master Meter) 2005 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990 2006 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990 2007 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990 2008 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990 2009 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990 2010 0.D75 0.200 0.090 0.365 . 0.150 0.013 0.528 2,640 2011 0.090 0.200 0.180 0.470 0.150 0.013 0.633 3,165 2012 0.105 0.200 0.270 0.575 0.150 0.013 0.738 3,690 2013 0.120 0.200 0.360 0.680 0.150 0.013 0.843 4,215 2014 0.135 0.200 0.450 0.785 0.150 0.013 0.948 4,740 2015 0.150 0.200 0.540 0.890 0.150 0.013 1.053 5,265 2016 0.165 0.200 0.630 0.995 0.150 0.013 1.158 5,790 2017 0.180 0.200 0.720 1.100 0.150 0.013 1.263 6,315 2018 0.195 0.200 0.810 1.205 0.150 0.013 1.368 6,840 2019 0.210 0.200 0.900 1.310 0.150 0.013 1.473 7,365 2020 0.225 0.200 1. 000 1.425 0.150 0.013 1.588 7,940 202] 0.240 0.200 1.100 1.540 0.150 0.013 1.703 8,515 2022 0.255 0.200 1.200 1.655 0.150 0.013 1.818 9,090 2023 0.270 0.200 1.300 1.770 0.150 0.013 1.933 9,665 2024 0.285 0.200 1.400 1.885 . 0.150 0.013 2.048 10,240 Assumptions: 1. Commercial use in the West 517 Zone is assumed to increase through the McCormick project and NASCAR. 2. Golf course irrigation will stay the same on average. Values are total use averaged over the year. 3. SKIA will grow according to the estimate provided in the 1999 Subarea Plan between 20 I 0 and 2024. 4. Intertie to the Main System varies depending on needs; value used is the average from 1999 to 2004. 5: Aero. Mobile Estates is at .build out; value used is the average from 1999 to 2004. 6. ERU calculated using value from the Bremerton Main System: 200 gallons per day per ERU for ADD. 7. More water than usual was supplied through the intertie in 2003/04 due to drier than normal weather. Planning Background lnfonnation 2-20 2005 City of Bremerton Water System Plan City of Bremerton Historical Water Use and Demand Forecast 25 o >> ns o ... <1l 15 Q. tIl C .2 ns C) ~ 10 :E 1999 2001 2003 2005 2007 2009 2011 2013 2015 2017 2019 2021 2023 --+- Average Day Demand Without Conservation -/I- Average Day Demand With Conservation -+- Maximum Day Demand Without Conservation --.- Maximum Day Demand With Conservation Figure 2-9 City of Bremerton West 517 Zone Water Use Forecast Average Day Demands 3 2 >. co Cl ... CIl a. III c: .2 IV C) c: .2 ~ o 1399 2001 2003 2005 2007 2009 2011 2013 2015 2017 2019 2021 2023 Figure 2-10 Planning Background Information 2-21 2005 City of Bremerton Water System Plan 2.4.2 Non-revenue Water Non-revenue water is defined as the difference between metered source water and metered water sales. Non-revenue water can include authorized uses such as water main flushing, fire fighting, and hydrant flow testing or unauthorized uses such as leaks and theft. Generally, systems having less than 10 percent non-revenue water are being maintained properly. Since 1999, Bremerton's non-revenue water has averaged 5.7 percent of metered production, as shown in Figure 2-11, which indicates that water loss is within acceptable levels. City of Bremerton Public Works and Utilities Non-revenue Water (Water Production vs. Consumption) 10% 9% 8% 7% 6% 5% 4% 3% 2% 1% 0% .---- -- - - -- -- .. --- . . . - -.. - . ... . . - - -.. - . - - ... ... - - -- - - I---- - -~ - -- I---- : : 9.5 9.0 8.5 8.0 7.5 M G 7.0 D 6.5 6.0 5.5 5.0 1999 2000 2001 2002 2003 2004 c==J % DIFFERENCE - PRODUCTION (MGD) - ,. - CONSUMPTION (MGD) Figure 2-11 2.4.3 Equivalent Residential Units An Equivalent Residential Unit (ERU) is defined as the amount of water consumed by a typical full-time, single-family residence. An ERU is a unit of measure to equate non- residential or multi-family residential water usage to a specific number of single-family residences. When ca1culatingERUs, only active accounts are considered. The amount of water associated with an ERU is system specific. The ERU for one system will differ from another based on demographics or water _ use patterns. An ERU for a particular system can also change with time associated with changing water use patterns (such as a lowering of ERU with conservation). Historical and projected water use in ERUs is presented in Table 2~5. The ERUs forBremerton's system are presented in Table 2-7. Planning Background Information 2-22 2005 City of Bremerton Water System Plan Table 2-7 ERU Calculation for the Bremerton Water Service Area Year ERU Gallons per day per single-family residence 1999 190 2000 187 2001 171 (drought plan implemented) 2002 179 2003 189 2004 184 Average 183 Use for Analysis 200 For analysis in this WSP, Bremerton will be using 200 gallons per ERU for ADD. This value is on the low end of the range for water systems in Washington but reflects several characteristics of Bremerton's system: including small lot size within the city limits, a much higher percentage of rentals (60%) than the national average (40%), the fact that one-half of Bremerton's residents are classified as low income, relatively high sewer rates, and Bremerton's water conservation program. 2.4.4 Commercial/Industrial Demands The Bremerton water supply area consists of approximately 1,400 commercial water accounts, including commercial, government, and industrial entities. Other than activities inside PSNS, the City has no large industrial users. The majority of businesses in the water supply area consist of office-based businesses, restaurants, medical facilities, automotive shops, and services (dry cleaners, beauty shops, etc.). The largest non- residential water users are identified in Tables 2-8 and 2-9. Sections 2.1.1 and 2.1.2 identify areas within the Bremerton water service area that are anticipated to experience commercia1lindustrial development. These areas are also described in Table 2-10. 2.5 Water Forecasts As the population grows and commercial/industrial development occurs, demands on the water system will increase accordingly. Water systems are required by DOH to prepare two forecasts: one forecast without conservation and one forecast showing the expected reduction from implementation of a conservation program. In 2003, the Washington State Legislature passedthe Municipal Water Supply- Water Use Efficiency Requirements Act. The Department of Health is expected to adopt water use efficiency regulations in 2006. These regulations will require water systems to prepare Water Use Efficiency Plans (WUEP). Bremerton's conservation program is described in Section 3. Planning Background Information 2-23 2005 City of Bremerton Water System Plan Table 2-8 Citv of Bremerton Main Water System Customer Facility Type Number of Pressure MGY MGD ERUs2 Meters Zone 2004 2004 City of Bremerton Wastewater Treatment Plants and Lift Wastewater 28 Various 84.40 0.231 1,153 Stations Harrison Memorial Hospital Hospital 6 E240 42.56 0.116 581 Central Kitsap School District Public School 9 E398 9.57 0.026 131 Kitsap County Fair and Parks Department Fairgrounds II E398 6.85 0.019 94 Bremerton School District Public School 17 Various 6.58 0.018 90 Bremerton Convalescent Center Residential Care I E240 5.61 0.015 77 Belmont Terrace Residential Care I E240 4.57 0.012 62 Best Western Bremerton Inn Hotel 6 W256 4.43 0.012 61 Olympic College College 15 W256 423 0.012 58 Forest Ridge Convalescent Center Residential Care I W440 4.22 0.012 58 Claremont East Retirement Center Residential Care I E240 4.09 0.01 I 56 Bremerton Hotel Hotel I W256 3.45 0.009 47 Washington State Ferries Ferry I W256 3.40 0.009 46 Frances Haddon Morgan Center Residential Care 5 W256 3.32 0.009 45 Albertsons Grocery 2 E240 2.72 0.007 37 Seven 1's Industrial 2 W256 2.70 0.007 34 Olympic Peninsula Kidney Center Medical I E240 2.51 0.007 34 Evergreen at Bremerton LLC Residential Care I W256 2.51 0.007 34 Super 8 Motel I W256 2.37 0.007 34 Safeway Groc I W256 2.10 0.006 30 Seasonal Customer Facility Type Number of Pressure MGY Use ERUs2 Meters Zone 2004 MGD 20043 City of Bremerton Parks Department Parks 39 Various 27.62 0.226 1,130 Bremerton Schoo I District School 16 Various 20.90 0.1 71 857 Woodlawn Cemetery Cemetery 3 W440 5.95 0.049 245 Kitsap County Fair and Parks Department Parks 4 E398 4.21 0.035 173 .. Olympic College School 16 W256 3.18 0.026 131 Central Kitsap School District School 2 E398 2.97 0.024 122 Forest Lawn Cemetery Cemetery 2 W256 2.91 0.024 119 Canterbury Manor Residential Care I E398 1.89 0.016 78 Kitsap Housing Authority Housing 2 W256 1.61 0.013 66 Port Orchard Sand and Gravel Gravel I W440 1.59 0.013 65 Notes: I. Does not include other water systems such as PSNS, Jackson Park, or Rocky Point 2. One ERU in Bremerton is equal to 200 gallons per day ADD 3. Seasonal Use equals MGD during the irrigation season Planning Background Information 2-24 2005 City of Bremerton Water System Plan Table 2-9 Bremerton West 517 Zone System ~5'LlUfGEST~N1)N'fRESIDENii:~N9rit~1RRI6Wfi0NtWAtERt.USERSjt\}J.~:\~j}~~i~~~~~:,~f~'i;i~t'JJ!~~1\~~~~:!i~H'E~j~ii\;{ii~:i~['~1~1,'i.~i~~ Customer Facility Type Number MG/yr MGD ERUs! of Meters 2004 2004 Fred Hill Materials Cement 3 10,20 0,028 140 Port of Bremerton Ai rport 10 1,28 0,003 17 Safe Boats International LLC Man u facturin 0,91 0,002 12 Coastal Marine Service Inc Service/Repair 0,20 0,001 3 Morrison Gravel Storage 0,15 <0,001 2 I, One ERU equals 200 gallons per day ADD ProposedLar Table 2-10 e Commercial/lndustri~d Development in the Bremerton Water Service Area Projected Water Use Average Day Demand ADD! Proposed Use Total Developable Acreage Zone Estimated ERUs at Buildour Development Name Owner Kitsap Lake Port Blakely Industrial and 300 W650 0 0,154 0598 2,990 Industrial Park commercial West Hills Pope Resources Industrial 60 W650 0 0,080 0,155 775 Industrial Area Port of Bremerton, Manufacturing, South Kitsap McCormick Land Wholesale, 547 W517 0 0.450 1,413 7,065 Industrial Area Company, and Retail, Services others McCormick Land McCormick Land Commercial 80 W517 0 0.080 0.232 1,160 Com an Com an International NASCAR Track3 Speedway Commercial 950 W517 0 0.025 0.025 125 Co oration I. Projected water use was estimated from data provided in the projects' sub-area plan. 2. An Equivalent Residential Unit (ERU) ~ 200 gallons/day ADD for Bremerton's system 3. NASCAR development as of 12/06 is extremely preliminary. Water use is estimated to be 1,500gpm peak domestic only 3 days per year with occasional lower demands the rest of the year and 3.000 gpm for 3 hours fire flow. Additional storage not currently identified in the CIP would be required for the track. 2.5.1 Forecast withoutConservation Average day system demands were forecasted in Tables 2-4, 2-5 and 2-6, assuming a continuation of the existing residential per capita demand and using projections provided by PSNS and for planned commerciallindustrial development. Annual average demand projections were based on the following: Planning Background Information 2-25 2005 City of Bremerton Water System Plan . Residential demands for single-family housing were calculated by increasing the 2004 single-family residential demand of 2.63 MGD by the same percentage as the projected population increases. Additional demands were reduced by 5 percent to account for implementation of federally-mandated, reduced flow plumbing fixtures in new construction. . Multi-family units forecasted demands were calculated the same way as single-family units. . Non-residential demands for commerciallindustrial development were increased by the same percent as the forecasted population growth. The increased demands of proposed large developments identified in Table 2-10 were added to the forecasted commerciallindustrial demands beginning in the years they are anticipated to be built. . Irrigation demands were calculated to increase at the same rate as population growth. . Without conservation, Navy industrial use would remain constant, and residential use would increase with population increases. . Non-revenue water was assumed to stay stable at the current 6-year average of 6 percent. . Rocky Point Water District demands are expected to increase with the forecasted increase in the population for that area. . City of Port Orchard is forecasted to use the maximum amount of water allowed in the interlocal agreement. 2.5.2 Forecast with Conservation Bremerton has emphasized water conservation since 1992. In the 1999 WSP, the City anticipated making the conservation achievements shown in Table 2-11 between 1999 and 2004. A separate "with conservation" average day demand forecast is included in Table 2-4 and was calculated taking projected conservation reductions into account as follows: . Single-family residential - Reach 5 percent of our accounts (approximately 700 units) each year for the next 10 years and they reduce by an additional 10 percent. This includes reductions in both indoor and outdoor use. e Multi-family residential -:- Reach 5 percent of the units (approximately 300 units) each year for the next 10 years and they reduce water use by 5 percent. Opportunities for water use reduction are more limited with multi-family dwellers. . Commercial- Reach 5 percent of accounts (approximately 130 units) each year and they reduce water use by 5 percent This includes only indoor use. e Irrigation - Reach 5 percent of the irrigation accounts (approximately 10 accounts) each year and they reduce use by 5 percent. In 2012 begin using reclaimed water at Pendergast Park. Planning Background Information 2-26 2005 City of Bremerton Water System Plan Table 2-11 Water Conservation Goals and Achievements 1999 - 2004 Customer Conservation Projected Actual Class Goal Indoor Outdoor Demand Demand Explanation Reduction Reduction Bremerton's conservation program Influence 5% of Savings of Use focus is primarily on Single- accounts 80,000 gpd reduced by this customer class, family ( approximately v' v' for an ADD 90,000 gpd resulting in an homes 700 units) each of2.64 for an expected response. year to reduce MGD ADD of There was also a water use 10% 2.63 MGD 4.2% reduction in population during this time. Influence 5% of Savings of Use The 4.2% reduction the units 12,000 gpd reduced by in population would Multi- (approximately v' for an ADD 110,000 have affected this family 300 units) each of 0.79 gpd for an customer class the year to reduce . ADD of water use by 5% MGD 0.69 MGD most. Influence 5% of Savings of Use The number of the accounts increased commercial accounts ( approximately 12,000 gpd by 290,000 has increased, and the Commercial v' for an ADD 130 units) each of 0.76 gpd for an WWTP has used year to reduce MGD ADD of more water for its water use by 5% 1.06 MGD odor control system. During the 2001 Influence 5% of Use drought, a major the irrigation Savings of reduced by focus was on accounts 6,500 gpd 140,000 reducing irrigation, Irrigation (approximately 10 v' for an ADD resulting in accounts) each of 0.43 gpd for an operational changes, ADD of year to reduce use MGD 0.30 MGD especially with the by5% City Golf Course and Parks. Use Reduce total water Savings of reduced by Although asked, the Navy use by 10% from v' v' 100,000 gpd 430,000 Navy does not have 1999 - 2019 for an ADD gpd for an an explanation for the of2.6 MGD ADD of decreased use. 2.27 MGD . Navy - The Navy expects its industrial demands to decrease over the next few years with the implementation of its conservation program, then to remain stable for the remainder of the planning period. Jackson Park Housing is near built-out, but a small percentage of growth was assumed. . Conservation reductions - No conservation reductions are projected for Rocky Point or City of Port Orchard uses. Planning Background Information 2-27 2005 City of Bremerton Water System Plan . Conservation behavior - After 2015, focus conservation efforts on preserving the conservation behavior of 80 percent of the accounts previously reached. This approach assumes that some customers will be resistant to conservation actions. 2.6 References City of Bremerton Comprehensive Plan. City of Bremerton Department of Community Development. 2004. DOH Water System Planning Handbook. Washington State Department of Health. 1997. Kitsap County Comprehensive Plan. Kitsap County. 1998. Puget Sound Naval Shipyard. Personal Communication with Mark Bennett. August 2005. The Growth Management Act (GMA, State of Washington. Revised Code of Washington, 1990, as amended. 1999. The Growth Management Act. Washington StateCTED. Washington State Community, Trade and Economic Development, Growth Management Division. Undated. Washington Water System Design Manual. Washington Department of Health. 2001. Planning Background Information 2-28 2005 City of Bremerton Water Supply Plan Section 3 Sources of Supply 3.1 Introduction The purpose of this section is to ensure that several options for water sources are considered to meet projected demands. These options include: · Optimization of existing sources, · Enhanced conservation measures, · Water right changes, · Interties, · Aquifer Storage and Recovery (ASR), · Use of reclaimed, non-potable water, · Treatment, where applicable, to permit use of water sources requiring more comprehensive treatment to meet current water quality regulations, and · Applications for new sources. 3.2 Water Sources Surface water and groundwater production is presented in Table 2-3 for the period 1985 to 2004. Surface water is obtained from the Union River system, while groundwater is drawn from local production wells. Average contributions from surface water and groundwater over the last 20 years are 1,776 and 1,200 million gallons per year or a distribution of 60 percent and 40 percent, respectively. Substantial increases in groundwater production occurred in 1992 and 1993, and in 2001 through 2004 due to decreased surface water availability and drought conditions. Table 2-3 also indicates a falling trend in total production since 2001 when the Water Shortage Contingency Plan was activated in response to that year's drought. Note that 1994 through 1999 had significantly higher than average precipitation, which can cause lower demands from reduced outdoor use. Maximum Day Demand, which reached its highest levels from 1988 to 1991, has reduced since and stabilized to about 15 MOD. 3.2.1 Surface Water Sources The Union River surface water annual firm yield estimate is 2,020 million gallons, which includes an estimate of the West Branch contribution at 250 million gallons and minimum downstream flows. This firm yield estimate is close to current average City surface water usage but less than actual average total diversions, which include diversions Sources of Supply 3-1 2005 City of Bremerton Water Supply Plan to Twin Lakes. This diversion is used to recharge the Twin Lakes Aquifer and has averaged approximately 350 million gallons per year. The firm yield analysis indicates that reliable surface water contributions to the City's water supply system are close to being maximized under the existing production procedures. 3.2.2 Groundwater Sources Groundwater supplies are obtained from 13 active production wells in the Garst Creek Basin, Anderson Creek Basin, and the Manette Peninsula. These wells are described in Tables 3-1and 3-2 and in the Kitsap County Initial Basin Assessment. Several studies on the City's groundwater systems have been conducted and are described below. Kitsap County Groundwater Management Plan (GWMP) - The GWMP was prepared in accordance with Chapter 173-1 00 WAC, Groundwater Management Areas and Programs, which led to designating Kitsap County as a Groundwater Management Area (GWMA) in October 1986. An Interlocal Agreement between the Kitsap Public Utility District and the Kitsap County Board of Commissioners in December 1986 established both entities as co-lead agencies for the evaluation and preparation of the GWMP. The GWMP document is presented in four volumes. Volume I is an assembly and analysis of groundwater related data and includes estimates of groundwater availability, use, and projected demand. Volume II provides technical supporting data and additional information developed for each of the study's five individual subareas. Volume III covers a variety of management issues and policies deemed appropriate by the Groundwater Advisory Committee to provide a comprehensive management strategy for groundwater resources throughout Kitsap County. Volume IV provides supporting and additional information, including the Kitsap County Initial Basin Assessment and issue papers developed in the process. Sources of Supply 3-2 2005 City of Bremerton Water Supply Plan Table 3-1 Groundwater Sources of Supply Groundwater Sources for the Bremerton Main System #08200R DOH Current Well Source Year Qi Capacity function # # Aquifer Drilled gpm gpm Anderson Creek Shallow Provides water to Anderson IR Fu lure Artesian Aquifer 2005 NA NA Creek Pump Station (PS2) Depth = 273' serving the West 256, West 580, and East 240 Zones. 2R S07 Anderson Creek Shallow Provides water to Anderson Artesian Aquifer 1989 1200 800 Creek Pump Station (PS2) Depth = 273' serving the West 256, West 580, and East 240 Zones. 3 S08 Anderson Creek Shallow Provides water to Anderson Artesian Aquifer 1943 1200 450 Creek Pump Station (PS2) Depth = 316' serving the West 256, West 580, and East 240 Zones. 6R future Anderson Creek Deep Provides water to Anderson Artesian Aquifer 2005 2000 NA Creek Pump Station (PS2) Depth = 645' serving the West 256, West 580, and East 240 Zones. 7 SI2 Anderson Creek Deep Provides water to Anderson Artesian Aquifer 1945 450 340 Creek Pump Station (PS2) Depth = 627' serving the West 256, West 580, and East 240 Zones. 8 S13 Anderson Creek Deep Provides water to Anderson Artesian Aquifer 1980 600 620 Creek Pump Station (PS2) Depth = 578' serving the West 256, West 580, and East 240 Zones. 9 SI6 Parkwood East Aquifer 1977 280 270 Provides water directly to Depth = 947' the East 398 Zone. 13 SI4 Manette Sea Level Provides water directly to Aquifer 1979 680 530 Reservoirs 17 & 20 in the Depth = 273' East 398 Zone. 14 S15 Manette Sea Level Provides water to the East Aquifer 1980 500 180 240 Zone and Pump Depth = 278' Station 16. 17 SI7 Twin Lakes Aquifer 1982 650 730 Pumps into the McKenna Depth ~ 296' falls transmission main. 20 S22 Twin Lakes Aquifer 1990 1150 1150 Pumps into the McKenna Depth = 260' Falls transmission main. 21 NA MeadowdaleAquifer Will pump into the East 398 Depth = 380' 1989 NA Est 500 Pressure Zone 22 future Gorst Valley Aquifer 1993 NA Est 400 Will pump into the West Depth = 157' 256 Pressure Zone Sources of Supply 3-3 2005 City of Bremerton Water Supply Plan Table 3-2 Groundwater Sources for the Bremerton West 517 Zone System #082734 DOH Current Well Source Year Qi Capacity Function # # Aquifer Drilled gpm gpm 15 S20 Twin Lakes Aquifer 1981 300 210 Provides water to the West f)pnth = ')0.1' 1\ 1'7 7 "npo <;:'"ctpm ....,......t-'~u -, . "'" ~ , a.....'-'u~ .......J....~.....U& ]6 NA I Gorst Sea Level Aquifer 1981 125 140 Irrigation only to Cascade Depth = 400' Course 18R S19 Twin Lakes Aquifer 2002 600 380 Provides water to the West Depth = 270' 517 Zone System 19 S21 Twin Lakes Aquifer ]988 300 260 Provides water to the West Depth = 183' 517 Zone System Wellhead Protection Plan - The Washington Department of Health adopted a Wellhead Protection Program in July 1994 requiring all suppliers of public drinking water to implement a wellhead protection plan. Each drinking water purveyor must define that portion of the aquifer providing groundwater to a production well. The overlying land is designated into 1-, 5-, and 10-year time-of-travel wellhead protection areas. Within these protection areas, a land use inventory must be conducted every two years to identify activities with the potential to contaminate groundwater, and the sites within the protection areas are notified and sent pollution prevention materials. The City's most recent update to the Wellhead Protection Plan was in 1996 and was previously submitted to DOH. Corst Creek Basin Study - An analysis of the Gorst Creek Basin groundwater supplies was conducted in 1996 describing basin hydrogeology and hydrology, developing a computer model, and evaluating various management strategies. Conclusions from this study included: The Gorst Creek Instream Flow Requirements (IFR) were set too high, since the existing IFR could not be met under natural conditions. Significant quantities of groundwater were discharging to Sinclair Inlet from the Lower Garst Valley and were considered to be a potential resource without hydraulic continuity constraints. Most of the water diverted to Twin Lakes is lost to seepage to the Union River and Garst Creek and partially captured by Wells 18 and 20. Anderson Creek Well Field Evaluation ..:...An aquifer test was performed to confirm safe yield and to maximize existing inactive wells through a replacement program in this area. Sources of Supply 3-4 2005 City of Bremerton Water Supply Plan 3.3 Enhanced Conservation Measures Water demand management through efficiency and conservation can be a cost-effective tool for meeting water needs for population growth while saving the Utility capital costs and improving customer relations. The City has placed an increasing emphasis on water conservation efforts since 1992. Evaluation of water use by equivalent residential unit (Table 2-7) indicates a steady reduction in water use since 1999. Total water use has remained steady for the past 10 years. Customers responded enthusiastically to the 2001 drought conservation message and reduced water use that summer by 18 percent, well in excess of the 10 percent voluntary reduction the City requested. Non-revenue water is defined as the difference between metered source water and metered water sales. Non-revenue water can be authorized uses such as for flushing, fire fighting, and hydrant flow testing or unauthorized uses such as leaks and theft. Generally, systems having less than 10 percent non-revenue water are being maintained properly. Since 1999, Bremerton's non-revenue water has averaged 5.7 percent, which indicates that water loss is not a problem (Figure 2-10). Bremerton has implemented enhanced conservation measures, defined as measures above and beyond those required for a medium-sized water system. In accordance with the recommended water conservation program contained in the DOH 1994 publication, "Conservation Planning Requirements," the City is required to implement the measures for a medium system. Table 3-3 identifies the measures required for medium systems, as well as those implemented by the City. Recommended DOH (1994) Water Conservation Program for Public Water Systems Recommended Recommended lmplemented by Conservation Measures for Medium Systems for Large Systems Bremerton A. Public Education ,/ ,/ I. School Outreach ,/ ,/ 2. Speakers Bureau ,/ ,/ 3. Program Promotion ,/ ,/ ,/ 4. Theme Shows and Fairs B. Technical Assistance ,/ ,/ ,/ I. Purveyor Assistance ,/ ,/ ,/ 2. Customer Assistance ,/ ,/ 3. Technical Studies 4. Bill Showing Consumption History ,/ ,/ ,/ C. System Measures ,/ ,/ ,/ I. Source Meters ,/ ,/ ,/ 2. Service Meters 3. Unaccounted Water/Leak Detection ,/ ,/ ,/ D. Incentives/Other Measures ,/ ,/ I. Single-family/Multi-family Kits ,/ ,/ N/A 2. Nurseries! A-griculture ,/ ,/ ,/ 3. Landscape Management! PlayfieJds/ ,/ Xeriscaping ,/ ,/ 4. Conservation Pricing ,/ 5. Utility Financed Retrofit ,/ 6. Seasonal Demand Management ,/ ,/ 7. Recycling/Reuse ,/ ,/ Table 3-3 Bremerton Conservation Practices Sources of Supply 3-5 2005 City of Bremerton Water Supply Plan Table 3-3 shows that despite classification as a "medium" system, the City has implemented most of the requirements of a large system. In addition to these measures, demand has been reduced by the 1992 Energy Policy Act, which requires efficient plumbing features in new construction. These indoor water-efficient devices, such as low flow toilets, faucets, and showerheads, save an estimated 35 percent of indoor water use (Vickers, 2001). The overall effectiveness of all these measures is confirmed by trends already noted in Table 2-11. In 2003, the Washington State Legislature passed the Municipal Water Supply - Water Use Efficiency Requirements Act. The Department of Health is expected to adopt water use efficiency regulations in 2006. Under the new regulations, the City of Bremerton will be required to implement the measures for a large system (over 10,000 connections) and prepare Water Use Efficiency Plans (\VUEP). The WUEP for the City of Bremerton is currently "interim" to meeting the requirements of the 2005 Water System Plan schedule and contains many elements of the new regulation but cannot be completed until the requirements of the new regulations are finalized. The City of Bremerton values the continued high quality and usually ample supply of its water- resources. Customer education about water quantity and quality creates awareness, which can result in improved water use habits. Water use efficiency can be viewed as a resource, an alternative to developing new water supplies to meet new water demands. The current objectives of the City of Bremerton WUEP are: · Maintain use per ERU at or below 200 gallons per day per single-family residence. · Keep Maximum Day Demand less than twice the Annual Average Day Demand. · Meter every source. · Meter all demands as practicable and provide an estimate for demands that cannot be metered (such as for flushing and firefighting). · Maintain the water system to prevent leaks, promptly repair all leaks that occur, and maintain the difference between volume of water produced and metered water used below 10 percent. · Educate customers about their water sources and basic water supply principles. e Work with the Navy, Bremerton's largest point water user, to enhance its water efficiency. · Encourage a conservation ethic. · Increase customer awareness of water-use habits and the value of water. · Continue to reduce system wide per-capita water consumption. · Improve system reliability. · Protect environmental resources. · Ensure water use efficiency prior to using new sources of supply. Sources of Supply 3-6 2005 City of Bremerton Water Supply Plan Under the new requirements, Bremerton will have to implement a public process for City Council to set water efficiency goals considering: · Historic water use efficiency performance, · Historic water use efficiency investment, Q Customer base demographics, · Regional climate variations, · Forecasted demand characteristics, · Water supply characteristics, · System financial viability, · System reliability, and · Affordability of water rates. Implementation of water efficiency objectives has the potential for water savings on both a daily demand basis and a peak demand basis, thereby delaying the need to develop costly new resources and avoid capital costs. Water use efficiency programs will also be required if a system will be requesting additional water rights or applying for State Revolving Fund loans. Table 3.4 identifies the measures required for both medium and large public water systems under the new water efficiency requirements. In addition to these measures; demand has also been reduced by the 1992 Energy Policy Act, which requires efficient plumbing features in new construction. Table 3-4 Water Efficienc Re uirements Overview of Proposed Water Use Efficiency Requirements for Municipal Water Suppliers >10,000 Connections Required in Water System Plan (WSP): · Source description Monthly source production and seasonal variability descriptions System Average Daily Demand and Maximum Daily Demand Estimated population Annual usage data and seasonal variability descriptions for customer classes Current water demand A forecast of current and 6- and 20-year demand (without meeting and meeting ~ater use efficiency goals) while addressing land use, growth projections, and water use trends Distribution system leakage evaluation Water use efficiencymeasures using cost~effeCtivei1esscriteria or implementation An evaluation of water reclamation opportunities . Rate structure An evaluation of rates that encourage efficient use of water A description of the existing water use efficiency program An estimate of the amount of water saved through implementation of programs over the last 6 years An assessment of the maximum amount of water that could be saved through the implementation of all cost-effective water use efficienc measures Sources of Supply 3-7 2005 City of Bremerton Water Supply Plan Outside the WSP: Source meters Service meters within 12 years Water distribution system leakage standard set at 10 percent unless not technically feasible Development of a plan to reduce leakage if over 10 percent standard Leakage compliance calculated over a 3-year period Quantitative water use efficiency goals every 6 years through public process Annual perfonnance reporting }\........Ilua! total source production Annual leakage percent and volume Narrative including goals description, schedule, and progress towards meeting goals 3.4 Water Rights Evaluation The status of the City's water rights was reviewed and each right's characteristics and limitations determined, so the City can fully utilize its water resources. An inventory of all Bremerton water rights claims, certificates, and applications is listed in Table 3-5. The ability of the water rights to meet future projected demands is presented in Table 3-6. This table contains several sources that appear as water rights surplus, although they are currently not in use and have the following explanations: · Charleston Creek - This claim is for a historically-used source, which is no longer used. · Anderson Creek - The City maintains this water right as an emergency source. · Gorst Creek - The City maintains this water right as an emergency source. Bremerton does not currently receive any of its water from interties with other systems. An intertie exists between Bremerton's main system and the West 517 Zone. The City of Bremerton holds water rights certificates and claims for both surface water and groundwater. With Bremerton's dual sources, both current and forecasted 2024 average day demands and maximum day demands can be met, as indicated in Table 3-5. These dual sources are operated conjunctively to maximize resource efficiency. Generally, surface supplies are emphasized during the high precipitation periods in the winter and spring, and groundwater sources are used in addition to the surface water in the summerand fall. Since Bremerton's surface water supply is unfiltered, the City relies on groundwater during times when storms cause the turbidity to increase on the surface supplies above desired levels. It is essential that the City maintains adequate groundwater supplies to maintain system reliability. Because Bremerton utilizes an unfiltered surface source for 60 percent of its supplies, the City needs to be able to meet average day demands with only well sources during the times the surface supply is unavailable due to high turbidity or during severe drought conditions. Because severe drought conditions are likely to correspond to maximum day demand periods, the City should maintain capacity in its groundwater supply to meet all of the system demands. The City has the following pending water right actions: · Change of purpose and place of use for five Domsea wells to the Gorst Production Well (Well 22) (1,200 gpm total, 233.5 gpm for consumptive use, 966.5 non-consumptive) · Change of amount for Well 9 to 1,000 gpm (1,600 AFY) · New application for WeIl21 (500 gpm, 800 AFY) Sources of Supply 3-8 2005 City of Bremel10n Water Supr,. 'Ian Current Water Right Status Primary Existing Water Rights Existing Consumption Excess or Deficiency Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum Annual Annual Certificate, or Rightholder or Priority Name/ Supple- Instantaneous Annual Volume Instantaneous Volume Instantaneous Volume Note Flow Rate (Qi) Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) (Qa)(Acre- Claim Number Claimant Date Number mental (gpm) (Qa)(Acre-Feet) (gpm) Feet) , (gpm) Feet) Groundwater Certificates City of Bremelion Well 18 P 600 677 370 596 230 81 G 1-25280C 7/25/1988 I Gl-25797C City of Bremerton 8/2/1990 Well 20 P 1,150 1,300 1,150 1300 0 0 I GI-25800C City of Bremerton 8/2/1990 Well 19 P 300 338 240 338 60 0 G J -24772C City of Bremerton ] 2/19/1985 Well 15 P 300 338 205 330 0 8 2 GI-23939C City of Bremerton 9/10/1981 Well 17 P 650 1040 735 1040 0 0 2 GI-23718C City of Bremerton 12/5/1980 Well 14 P 500 800 180 290 320 510 GI-22932C City of Bremer/on 8/1111977 Well 8 S 600 960 600 960 G 1-22933C City of Bremer/on 8/11/1977 Well 9 S 280 448 270 435 G 1-23367C City of Bremerton 4/11/1979 Well 13 P 680 1088 510 82] 170 267 G 1 *05570C (3728) City of Bremerton 4/15/1960 Well 7 P 450 700 340 700 110 0 GI-23787C City of Bremer/on 3/6/1981 Well 16 (I) 130 75 140 225 - 5,414 Acre- Total Ground - - - 5,510 gpm 6,281 Acre-Feet 4,600 gpm Feet 890 gpm 867 Acre- Feet ** Water Certificates 7.9MGD 5.6MGD 6.6 MGD , 4.8MGD 1.3 MGD 0.8 MGD Table 3.5 . Water Rights for Existing Condition Note - Shaded Items are not Included ill totals. Sources of Supply 3-9 2005 City of Bremerton Water Supp,.lan ~!"rent Water Right Status Primary Existing Water Rights Existing Consumption Excess or Deficiency Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum Annual Annual Certificate, 0 r Rightholder or Priority Name/ Supple- Instantaneous Annual Volume Instantaneous Volume Instantaneous Volume Note Flow Rate (Qi) Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) (Qa)(Acre- Claim Number Claimant Date Number mental (gpm) (Qa)(Acre-Feet) , (gpm) Feet) (gpm) Feet) Surface Water Certificates Union RI*13553C River (6945) City of Bremerton 8/12/1955 Reservoir (R) NA 4,000 NA NA NA 4,000 81*13552C Union (6945) City of Bremelion 8/12/1955 River/ 801 P 11,220 (25 cfs) 4,000 1 ])20 4,000 0 0 * R 1 *04178C Union (2793) City of Bremelion 11/25/1935 River (R) NA 1,200 NA NA NA 1,200 Union River (West 81*02599C Branch )/ (2509) City of Bremelton 5/22/1929 S02 P 4,488 (10 cfs) 7,227 (,280 2,260 0 4967 * Union River (East 81 '02598C Braflch)/ (2222) City of Bremelton 5/22/1929 S03 P 2,244 (5 cfs) 3,6J4 0 NA 0 3,614 * 20,04] Acre- feet (Note - Surface Water Firm Yield is 6,260 /3,78/ Acre- ]7,952 gpm Acre-feet.) 12,500 gpm 6,260 Acre-feet 5,452 gpm feet ]7.9 MGD Note (Surface Water - Firm Yield is 5.6 Total Surface - 25.9 MGD MGD) 18.0 MGD 5.6MGD 7.9 MGD - - 12.3 MGD * Water Certificates , 40 cfs , I 27.9 cfs I 12. I cfs Table 3.5 continued - Water Rights for Existing Condition Sources of Supply 3-10 2005 City of Bremerton Water Supp.. .Jlan Table 3.5 continued - Water Rights for Existing Condition Current Water Right Status Primary Existing Water Rights Existing Consumption Excess or Deficiency Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum Name/ Supple- Annual Annual Certificate, or Rightholder or Priority Instantaneous Annual Volume Instantaneous Volume Instantanl:ous Volume Note Claim Number Claimant Date Number mental Flow Rate (Qi) Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) (Qa)(Acre- (gpm) (Qa)(Acre-Feet) (gom) Feet) (gpm) Feet) Groundwater Claims ] 16700 City of Bremel10n Oct-44 Well 6R/5R P 600 700 1,400 700 0 0 3 ] 1670] Citv of Bremelion Jan-44 Well 6R/5R P 800 1,000 1,400 1,000 0 0 3 ] ]6702 City of Bremelion Jun-44 Well 4 P 500 650 0 0 0 0 Well 3 116703 Citv of Bremel10n Jul-43 &3R P 1,200 1,500 1,840 1,500 0 0 4 116704 City of Bremel10n Seo-41 Wel12R P 1.200 1,500 835 1,344 365 156 116705 City of Breme110n Seo-40 Well] R/3R P 800 1,000 1,840 1,000 0 0 4 . - - - 806 Acre- - 5,100 gpm 6,350 Acre-feet 4,075 gpm 5,544 Acre-feet 0,865 gpm feet Total Ground Water Claims 7.3 MGD 5.7 MGD 5.9 MGD 4.9 MGD 1.2 MG'D OJ MGD Surface Water Claims Charleston currently not currently not currently 116706 City of Bremel10n Jun-02 Creek P 898 (2 cfs) 300 currently not used used used not used Gorst emergency use emergency use emergency use emergency 116707 City of BremeJ10n Jun-II Creek! SO 5 P 6732 (15 cfs) 5000 only only only use only Anderson emergency use emergency use emergency use emergency 116708 City of BremeJ10n Aug-03 Creek! S04 P 3590 (8 cfs) 3000 only only only use only Not available or Emergency 8,300 Acre-feet Not available or Emergency Only Only 11,220 gpm - - - Total Surface - 16.2 MG'D 7.4 MGD Water Claims 25 cfs Shaded areas not included in totals. Sources of Supply 3-11 2005 City of Bremelrton Water SUP.. _ i>lan , , , Current VVater Rh'ht Status Primary Existin!! Water Ri!!hts Existing' Consumotion Exces!; or Deficiency Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum Annual Annual Annual Ccrtificate, or Rightholder or Priority Name/ Supple- Instantaneous Volume Instantaneous Volume Instantaneous Volume Note Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) (Qa)(Acre- Claim Number Claimant Date Number mental (!!om) Feet). (!!om) Feet) (!!om) Feet) 12,631 Acre- 10,610 gpm feet 10,958 Acre- 1,673 Acre- Total 8,675 gpm feet 1,755 gpm feet Groulldfvater .' 15.3 MGD 11.3 MGD 12.5 MGD 9.8 MGD 2.5 MGD 1.5 MGD 20,04] Acre- feet (Firm Yield is 6,260 6,260 Acre- 13,781 Acre- 29,172 gpm A ere-feet.) 12,500 gpm feet 5,542 gpm feet 17.9 MGD Note (Surface Water Firm Total Surface Yield is 5.6 Water (5) 42.0 MGD MGD) 18.0 MGD 5.6 MGD 7.9 MGD 12.3 MGD 32,672 Acre- feet (18,816 aCI:essible using firm yield of 6,260 acre feet) 17,218 Acre- 15,454 Acre- 39,782 gpm 21,175gpm feet 7,207 gpm feet 29.2 MGD (16.9 MGD Accessible Total using firm Certificates yield of 5.6 and Claims (6) 57.3 MGD MGD) , 30.5 MGD r 15.4 MGD I 10.4 MGD 13.8 MGD , Table 3 5 continued. Water Rights for Existing Condition Notes: I. 2, 3. and 4 - The existing water rights are either or both. 5 - Emergency and unused sources not included in totals. 6 - Totals do not include annual yolwnes for supplemental rights, or instantaneous and annuals amounts for irrigation, emergency or unused sources. · - For maximum annual yolwne, annual quantity was not established for surface water certificates. .* _ For existing consumption, not all wells pumped at the maximum Qi on the same day. therefore total Qi is not exceeded. (I) - Irrigation only (not included in totals). (R) - Reservoir, secondary rights (not included in totals). S _ Supplemental to existing rights (not included in Qa totals). Sources of Supply 3-12 2005 City of Bremerton Water Supp.. ,.Ilan Table 3.6 - Water Rights for Future Condition (2024) . . , Forecast Water Use From Sources Water Right Status Primary Existinl1 Water Ril1hts 20-Year Demand Excess or Deficiencv Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum Annual Certificate, or Riightholder or Priority Name/ Supple- Instantaneous Volume Instantaneous Annual Volume Instantaneous Annual Volume Note Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) Flow Rate (Qi) Claim Number Claimant Date Number mental (I1Dm) Feet) ~ (Qa)(Acre-Feet) (gpm) (Qa)(Acre-Feet) , Groundwater Certificates City of G 1-25280C Bremerton . 32349 Well 18 P 600 677 370 596 230 177 I City of G 1-25797C Bremelion . 33087 Well 20 P 1,150 1,300 1,150 ] ,300 0 100 I City of . G 1-25 800C Bremerton 33087 Well 19 P 300 338 240 338 60 38 City of G 1-24 772C Bremelion 31400 Well 15 P 300 338 205 330 0 38 2 City of G 1-23939C Bremelion 29839 Well 17 P 650 1040 735 1040 0 590 2 City of GI-23718C Bremetion 29560 Well 14 P 500 800 180 290 320 600 City of GI-22932C Bremerton 28348 Well 8 S 600 960 600 960 0 NA City of G 1-22933C Bremelion 28348 Well 9 S 280 448 270 435 10 NA City of GI-23367C Bremelion 28956 Well 13 P 680 1088 510 821 170 688 G j*05570C City of (3728) Bremerton 22021 Well 7 P 450 700 340 700 110 350 City of Gl-23787C B rem erto n 29651 Well ]6 ( I) 130 75 140 120 NA NA - - 6,281 Acre- Tota' Ground - - 5,510 P'Dm feet 5,510 fUJm 6,281 Acre-feet 900 gpm 867 Acre-feet ** Water Cen'ijicates 7.9 MGD 5.6 MGD 7.9MGD 5.6 MGD 1.3 MGD 0,8 MGD Shaded areas not included in totals. Sources of Supply 3-13 2005 City of Bremerton Water SUPP'.J r'lan , , Forecast Water Use From Sources Water Right Status Primary Existinl! Water Ril!hts 20-Year Demand Excess or Deficiencv Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum Annual Certificate, or Rightholder or Priority Name! Supple- Instantaneous Volume Instantaneous Annual Volume Instantaneous Annual Volume Note Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) Flow Rate (Qi) Cla;im Number Claimant Date Number mental (l!om) Feet) (l!om) (Qa)(Acre-Feet) (gpm) (Qa)(Acre-Feet) , Surface Water Certificates RI * 13553C City of Union River (6945) Bremerton 8/1211 955 Reservoir (R) NA 4000 NA 0 NA 4000 Sl*13552C City of Union (6945) Bremerton 8/1211 955 River! SO] P 1 ]220 4000 11220 4,000 0 - * Rl *04178C City of (2793) Bremerton 11!25/1935 Union River ( R) NA ]200 NA NA NA 1,200 Union River (West S I *02599C City of Branch)! (2509) Bremerton 5/2211 929 S02 P 4488 7227 1280 2260 3208 4,967 * Union River (East S I *()2598C City of Branch)! (2222) Bn~merton 5/22!1929 S03 P 2244 3614 0 NA 1244 3,614 * 20,04] Acre- ]7,952 gpm feet ]2,500 gpm 6,260 Acre-feet 5,452 gpm 13,781 Acre-feet - - - - 25.9 MGD ]7.9 MGD ]8.0 MGD 5.6MGD 7.9 MGD 12.3 MGD * (6,260 AF & 5.6 MGD are Additional storage current firm and diversions are Total Surface yield for not normally Water Union River available on Cert.ificates 40 cfs Svstem) 27.85 cfs ]2.1 cfs current system , , Table 3.6 continued - Water Rights for Future Condition (2024) Sources of Supply 3-14 2005 City of Bremerton Water SUPPI~ .'Ian Table 3.6 continued. Water Riahts for Future Condition (2024) Forecast Water Use From Sources Water Ri!!ht Status Primary Existing Water Ril!'hts 20-Year Demand Excess or Deficiencv Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum Annual Cerlificate, or Rightholdcr or Priority Name/ Supple- Instantaneous Volume Instantaneous Annual Volume Instantaneous Annual Volume Note Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) Flow Rate (Qi) Claim Number Claimant Date Number mental (gpm) Feet) (gpm) (Qa)(Acre-Feet) (gpm) (Qa)(Acre-Feet) Groundwater Claims City of Anderson 116700 Bremerton . Oct-44 Creek! S 11 P 600 700 1,400 700 0 100 3 City of Anderson 11670 I Bremerton Jan-44 Creek! S 1 0 P 800 1000 1,400 1,000 0 400 3 . City of Anderson 116702 Bremerton Jun-44 Creek! S09 P 500 650 Abandoned Abandoned 500 650 City of Anderson 116703 Bremerton Jul-43 Creek! S08 P ]200 1500 1,840 1,500 0 500 4 City of . Anderson . 116704 Bremerton S ep-4 I Creek! S07 P 1200 1500 835 1,344 365 404 City of Anderson 116705 Bremerton Seo-40 Creek! S06 p 800 1000 1,840 ],000 0 0 4 - - 6,350 Acre- - - 5,/ 00 gpm feet 4,075 gpm 5,544 Acre-feet 0,865 gpm 2,054 Acre-feet Tolal GrO~lI1d Waler Claims 7.3 MGD 5,7 MGD 5,9MGD 4,9 MGD 1.2 MGD 1,8 MGD , , Sources of Supply 3-15 2005 City of Bremelrton Water Sup~ ,'Ian Forecast Water Use From Sources Water Right Status Primary Existinl' Water Ril'hts 20-Year Demand Excess or Del1ciencv Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum Annual Ce"til1cate, or Rightholder or Priority Name/ Supple- Instantaneous Volume Instantaneous Annual Volume Instantaneous Annual Volume Note Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) Flow Rate (Qi) Claim Number Claimant Date Number mental (gpm) Feet) (gpm) (Qa)(Acre-Feet) (g:pm) (Qa)(Acre-Feet) Surface Water Claims City of Charleston currently not currently not 116706 Bremerton Jun-02 Creek P 898 300 used currentlv not used used currentlv not used City of Gorst Creek! emergency use emergency use 116707 Bremerton Jun-II S05 P 6732 5000 orily emer17ency use orily orilv ememencv use onlv City of Anderson emergency use emergency use 116708 Bremerton Aug:-03 Creek! S04 P 3590 .3000 orily emerQencv use only orily emergency use orily . 8,300 Acre- 11,220 gpm feet - - Not available or Not available or Not available or Not available or Tota/ SUllace - - /6.2 MGD 7.4 MGD Emergency Only Emergency Only Emergency Only Emergency Only Water Claims 25 eft Table 3.6 continued. Water Rights for Future Condition (2024) Shaded areas not induded in totals: Sources of Supply 3-16 2005 City of Bremerton Water Supr,. Ian Forecast Water Use From Sources Water Right Status Primary Existing Water Rights 20-Year Demand Excess or Deficiency Permit Name of So u rce or Maximum Maximum Maximum Maximum Maximum Maximum Annual Certificate, or Rightholder or Priority Name/ Supple- Instantaneous Volume Instantaneous Annual Volume Instantaneous Annual Volume Note Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) Flow Rate (Qi) Cla;m Number Claimant Date Number mental (gpm) Feet) (gpm) (Qa)(Acre-Feet) (gpm) (Qa)(Acre-Feet) Totut Groundwater - 12,631 Acre- - - - 10,610 gpm feet 8,675 gpm 10,958 Acre-feet 1,265 gpm 1,023 Acre-feet 15.3 MGD 11.3 MGD 12.5 MGD 9.8 MGD 1.8 MGD 0.9 MGD ['' s"rm - 20,041 Acre- Water (5) - - - 17,952 gpm feet 12,500 gpm 6,260 Acre-feet 5,452 gpm 13,781 Acre-feet 25.9 MGD 17.9 MGD 18.0 MGD 5.6 MGD 7.9 MGD 12.3 MGD - - 32,672 Acre- Total - - 28,562.0 gpm feet 21,175.0 gpm 17,218 Acre-feet 6,717.0 gpm 14,804 Acre-feet Certificates and Claims (6) 41.1 MGD 29.2 MGD 30.5 MGD 15.4 MGD 9.7 MGD 13.2 MGD Table 3.6 continued. Water Rights for Future Condition (2024) Notes: 1.2,3,4 - The existing water rights are either or both. 5 - Emergency and unused sources not included in totals. 6 - Totals do not include annual yolwnes for supplemental rights, or instantaneous and annuals amounts for inigation, emergency or unused sources. * - For maximum annual yolwne, annual quantity was not established for surface water certificates. ** - For existing consumption, not all wells pumped at the maximum Qi on the same day, therefore total Qi is not exceeded. (I) - lnigation only (not included in totals). (R) - Reservoir, secondary rights (not included in totals). S - Supplemental to existing rights (not included in Qa totals). Sources of Supply 3-17 2005 Bremerton Water System Plan Evaluation of current and future demands, Figures 3-1 and 3-2, shows the analysis of average day demands and maximum day demands compared to existing water rights, accessible rights and groundwater only. The projected 2024 average day demand is 14.0 MGD. Figure 3-1 shows that while the City's water rights claims and certificates total an average day demand of 36.6 million gallons per day (MGD), the firm yield of the surface supply system is only 5.6 MGD. Therefore, the currently accessible portion of water rights (Firm Yield) plus groundwater rights totals 16.9 MGD. However, if the City had to rely on its groundwater supply only, a shortfall in installed capacity and water rights would exist by the year 2016. City of Bremerton Average Day Demand Analysis 2005 - 2024 40.0 5.0 II II II II II II II II II II II II II II II II II II II II ------------------- ... 35.0 30.0 o Cl ~ 25.0 '" tV o a; ;; 20.0 t: .2 .. Cl t: 15.0 ~ :E 10.0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Year -- ADD demand --- Existing Water Rights . - - Firm Yield + GW Rights --><--- GW Rights Only -l<- GW Installed Capacity I Figure 3-1 The projected maximum day demand (MDD) for the year 2024 is 27.9 MGD. Figure 3-2 shows the existing water rights for the City total 57.3 MGD; however, removing the emergency supplies leaves 40 MGD of available rights. Since the surface water source is unfiltered and future climate change may affect the groundwater supply, it is important to consider the ability of the system to meet demands from its groundwater supplies bnly. The figure shows that the existing maximum day demands cannot. be met by the existing groundwater instantaneous rights or the installed capacity. To meet future demands from groundwater only, additional groundwater rights (Qa and Qi) and installed capacity of 4.2 MGD Qa (4,688 acre-feet Qa), 13.9 MGD Qi, and 16.4 MGD of installed capacity are needed. Table 3.7 provides a summary of the analysis. Sources oj Supply 3-18 2005 Bremerton Water System Plan MGD - Million Gallons Per Day City of Bremerton Maximum Day Demand Analysis 2005 - 2024 45.0 40.0 35.0 30.0 . . . . ;; . . . . . . . . . . . . . . . 25.0 20.0 15.0 x ~~ )( )< )( )< )< :~ )( )< )1( )( )< J( )< ~( )< )1( )< ll:: 10.0 5.0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Year -- Existing Water Rights -- GW Installed Ca ad Figure 3-2 Table 3-7 Anal sis of Existin and Future Water Demands and Water Ri hts Forecasted Water Rights for the City of Bremerton Groundwater Only 2004 2004 Can 2004 ADD of Can 2024 ADD of Can 2004 MDD Can 2024 Qa water Qi water 8.1 MGD be met 13.81 MGD be of ]4.9 MGD be MDD of27.63 rights rights with Qa? met with Qa? met with Qi? MGD be met MGD MGD with Qi? 29.2 (16.9 MGD 41.1 Yes Yes Yes Yes using Finn Yield 11.3 14.0. Yes 15.3 29.5 Yes 9.7 11.5 Yes Combined Sources Combined Sources - Installed Capacity Groundwater Only Installed Capacity Notes: Qa = the certificated annual quantity (ac-ftIyr converted to MGD) Qi = the certificated insta.itaiieous qUdJJtitj (gpm converted to ~vfGD) This table does not include water rights Bremerton has for supplemental (annual only), irrigation, unused, or emergency sources. Annual quantity for surface water is not established; therefore, the firm yield of the Union River system (5.6 MGD) was used for the installed capacity. Instantaneous surface supply use is currently limited to -18 MGD by the size of the transmission line. Sources of Supply 3-19 2005 Bremerton Water System Plan The City filed four applications in 1954/57 for withdrawal and storage from the Hamma Hamma river system. This surface source was evaluated in past reports and identified as a potential regional supply in the Kitsap County CWSP. Ecology contacted the City in 1998 regarding these applications, since the Hillis legal decision required the State to act on applications in order of date. The City responded that any decision regarding this application should be held off pending resolution of important water rights and ESA questions. In April 1999, Ecology denied these applications, and Bremerton did not appea1. In recent years, it has become increasingly difficult to obtain new water rights from Ecology. This is due to a combination of factors, including inadequate staffing at Ecology, increased attention to protection of instream flows, inadequate data or consensus on the relationship between groundwater withdrawals and stream flows, and implementation of WRIA-based state- funded watershed plans. Some improvement has occurred in recent years, since Ecology is now processing change applications. However, no definitive solution to this problem seems to exist. Ecology anticipated collaborative watershed plans would help determine whether new rights can be issued in each basin. A watershed planning process was funded for WRIA 15, the basin comprising the Kitsap Peninsula and including Bremerton's sources of supply. However, after five years of work and development of a draft plan, the plan was rejected due to the veto of the Sqauxin Island Tribe, an initiating government. This action halted the watershed process, and WRIA 15 will not be eligible for further watershed implementation funds. Utilizing changes to existing water rights can be an alternative to making application for and securing additional new water rights. Several advantages to this include the better potential for approval of an application for change than a new application and obtaining water rights with earlier priority dates than for a new application. The following approaches are recommended for securing needed new water sources: · Continue to pursue Domsea Wells change application for the new well drilled in 1993. . Continue to pursue application for Well 9. · Continue to pursue application on Well 21 (Emergency Water Rights were received in 2001). . The City is currently maximizing surface water sources and new sources will likely be groundwater. A letter has been sent to PUD #1 regarding drilling a test well to potentially serve an area of planned industrial growth in the City' s West 517 Zone. . Apply for a replacement well for Well 4 for 865 gpm and 806 aflyr to maximize these claims. . Apply for anew groundwater permit for supplemental water rights of 890 gpm and 867 aflyr to use unused existing groundwater certificate capacity. . Apply for a new wellfie1d permitwith a capacity of 3,500 gpm (for 20 year demand) and at least 5,000 aflyr to ensure reliability in the water system in case of drought or other conditions that would render the surface water supply unavailable. . Alternately, if the hydrogeological study shows potential for aquifer storage and recharge (ASR), apply for a storage permit for groundwater. Sources of Supply 3-20 2005 Bremerton Water System Plan · Conduct hydrogeological investigations to determine the potential impact on surface water supplies for the wellfield operation. All of the above options for water right changes will be fully considered by the City as elements in developing strategies to meet future demand projections. 3.5 !nterties As defined within RCW 90.03.383, the City has one emergency and five non-emergency interties as listed below. The emergency intertie to North Perry Water District was installed in the early 1980s and has never been used. The non-emergency interties are: . City of Port Orchard . Puget Sound Naval Shipyard . Jackson Park Naval Housing . Rocky Point Water District · City of Bremerton West 517 Zone Water System (identified as a separate water system by DOH) Table 3-8 lists pertinent information on the interties. The City can provide water to each of the areas listed in Table 3-8. Except for Port Orchard and North Perry Avenue Water District, these areas do not have their own sources of potable water that could serve the City. Port Orchard and North Perry do not have excess supply capacity that could supplement the City's water sources on a sustained basis. Therefore, these interties cannot assist in meeting future Bremerton demands. Table 3-8 City of Bremerton Interties with Outside Water Systems System Served Area Served Purpose Direction Instantaneous Capacity Supplements Port Orchard Northern portion of demand and provides an To Port Orchard ] ,000 gpm Port Orchard emergency source to Port City of Port Orchard Orchard Supplements Port Orchard McCormick Water demand and provides an To Port Orchard I ,800 gpm System emergency source to Port Orchard Puget Sound Naval Provides all potable water for Shipyard and Bremerton PSNS properties PSNS properties To PSNS only Approximately3,000 gpm Naval Station Jackson Park Naval Jackson Park Provides all municipal water To Jackson Park Approximately 2,000 gpm Housing housing complex demand for Jackson Park only Rocky Point Water Entire Rocky Point Provides all municipal water To Rocky Point only Not determined District Peninsula for Rockv Point North Perry Water North Perry Water Emergency Supply Bi-directional Approximately 450 gpm District District Sources of Supply 3-21 2005 Bremerton Water System Plan 3.6 Aquifer Recharge Aquifer recharge is one potential option for additional future sources of water supply for municipalities. In most instances, aquifer recharge consists of introducing groundwater or surface water into a groundwater aquifer, storing the water in the aquifer for a period, and then withdrawing the water through wells later. The City has been following a procedure incorporating the concepts of aquifer recharge in which surface water is diverted from the Union River into Twin Lakes. Studies show that water introduced into Twin Lakes percolates into and recharges the Twin Lakes Aquifer and then flows laterally into both the Union River and Gorst Creek Basins. The City then recaptures a portion of this aquifer recharge through City wells. All required water rights authorizations are in place. The State of Washington recently formalized a procedure for dealing with this practice. Aquifer recharge programs have been undertaken by a few. municipalities, such as Seattle at their HighIine Wellfield, Yakima, and Walla Walla. Bremerton has plans to pursue this option, which may allow more use of the Gorst area aquifers. 3.7 Water Reuse The City owns and operates a secondary Wastewater treatment plant (WWTP) with an average flow of about 6.2 MGD, which could potentially be reclaimed after further filtration. Water reuse is the beneficial use of reciaimed wastewater treatment plant effluent in compliance with Washington Departments of Ecology and Health regulations. Bremerton's WWTP currently uses reclaimed secondary wastewater effluent for process and odor control and to irrigate inside the WWTP grounds and at a neighboring business. Approximately 150 gpm are used for in-plant uses, and an additional 120 gpm are used in the summer months for an annual total of 88 MG/year. A "Water Reuse Feasibility Study" completed in 1998 identified the potential demands for and costs to provide additional reclaimed water to potential users in the Bremerton area. Bremerton's wastewater has higher than average saltwater from collection system infiltration and Puget Sound Naval Shipyard inflow making reuse possibilities challenging. A 2005 County-wide reuse study indicated that Bremerton had the least potential for large-scale reuse and recommended grant funding be focused at other locations with more feasible reuse opportunities. The City is currently evaluating the next step to take in reuse. 3.8 Treatment DOH recommends that purVeyors experiencing reduction or loss of water sources due to water quality problems consider treatment to restore the source. This approach does not apply to the City's water system, since its main sources are not impaired by water quality problems. However, both Anderson Creek and Gorst Creek were historically used by the City and are maintained as emergency supplies. To be used long term, both sources would need to be treated in compliance with the SWTR. Sources of Supply 3-22 2005 Bremerton Water System Plan The Long Term 2 Enhanced Surface Water Treatment Rule was promulgated in December 2005. This new rule will require the City of Bremerton to conduct further Cryptosporidium monitoring and to provide a second disinfectant in addition to chlorine. Section 4 provides further analysis of the impacts of this new federal rule on Bremerton. Should reliability or quality of Bremerton's surface supplies become an issue, then filtration would be an option to consider. ~ a I"' Ii ..".,. ....,.. I"' h ... ... ,.. ..... oJ.v ,",lIl1lcn.v ,",lIall~v Increasing greenhouse gases in the atmosphere lead to an increase in the earth's air temperature. Evaluation of long-term temperature records for the Pacific Northwest shows substantial warming during the 20th century. A considerable body of research leads to the conclusion that the increase in globally-averaged temperature in the past 30-50 years is largely due to the rapidly rising greenhouse gases. Concentrations of greenhouse gases are much higher than they have been at any time since the rise of civilization 10,000 years ago. The climate, land surface, glaciers, and oceans are responding to these changes. Anticipating future directions of change is crucial in order to minimize the impacts of future change on water resource management. Current global and regional climate change models predict the following: · Climate change is a reality - the future will be warmer but uncertainty is unavoidable. · Climatological history is not a reliable guide to predicting the future. · Average temperatures are increasing, and the Puget Sound region warmed at a rate faster than the global average. · Sea levels in the Puget Sound will rise 4 to 35 inches in the next century due to climate change and the already-occurring land sinking in Puget Sound. · Less certainty exists about how climate change will affect precipitation. However, models indicate that although annual average precipitation could stay about the same, winter precipitation will increase slightly, and summer precipitation will decrease slightly. . Increases in intensity of winter rains are expected. . Snow pack is decreasing. . The main messages for water system managers from recent climate change research are: . Preparing for climate change is a high-stakes exercise in risk management. . Develop a climate change "insurance portfolio." · Integrate climate change projections in all appropriate City planning documents. · Summer drought is the Northwest's biggest vulnerability in a climate change scenario. · Expect surprises, enhance the water system's ability to respond to change, and ensure flexibility. Table 3-9 identifies what climate change could mean for Bremerton's water system management: Sources of Supply 3-23 2005 Bremerton Water System Plan Table 3-9 Potential Impact of Climate Change on Water Supply Climate Change Prediction Impact Action Plan Could cause turbidity problems in the reservoir and I. Ensure maximization of groundwater capacity through increased overflow events requiring extended shutdowns of Bremerton's unfiltered surface supply. 2. Explore costs of filtration Could change assumptions in Bremerton's firm yield I. Revisit firm yield assumptions as more calculations. information is available from regional Increased intensity of winter modeling. rams I. Revisit this issue as more information is Could limit storage flexibility if inflow is restricted to a available from regional climate modeling. tighter window. 2. Revisit Twin Lakes diversion protocols. 3. Explore ways to increase Union River capacity. Could reduce groundwater recharge. I. Track aquifer characteristics. 2. Watch for aquifer over-drafting. I. Continue to track/trend water use and MOD. Could increase summer water demands and Maximum 2. Focus conservation message to reducing Day Demand. outdoor water use 3. Explore seasonal water pricing. I. Track ET values and look for trends. 2. Revisit finn yield assumptions as more Could increase water loss from ET. information is available from regional modeling. Warmer and drier summers 3. Estimate changes in supply from climate change. . I. Keep water shortage plan up-to-date. Could increase occurrence of droughts. 2. Emphasize day-to-day conservation habits. 3. Explore more use of interties. Could affect algae growth in the reservoir. I. Continue tracking algal growth patterns. Could increase wildfire occurrence. I. Place extra emphasis on wildfire patrols. Could cause ecosystem effects in the forested watershed I. Monitor forest effects of climate change. such as pest infestation. Sea level rise Could cause saltwater intrusion in wells. I. IdentifY wells at possible risk. 2. M omtor and trend groundwater chlorides. Would not directly impact Bremerton, but would impact I. Track conservation and water use messages Decreased snow pack larger Puget Sound area surface water systems that from Seattle and other snow-pack systems. dominate the media. 2. Increase public outreach for Bremerton if our message is different. 3.10 Water System Reliability Analysis Water System reliability is the degree to which an adequate quantity of water canbe provided at acceptable service standards. The areas of reliability are source reliability for water quantity and quality, water right adequacy, customer service, and facility reliability. The actions that Bremerton takes to increase reliability are described below. 3.10.1 Source Reliability - Water Quantity · Bremerton's dual-source system of surface Water and groundwater provides system reliability, flexibility, and redundancy. In the event that surface sources are unavailable due to turbidity events or water shortage, then ADD can be met with groundwater sources only. hl the event that an individual groundwater source is unavailable, then the system is flexible enough to meet demands with other sources. Bremerton's plan is to increase groundwater supplies to increase reliability. Sources of Supply 3-24 2005 Bremerton Water System Plan · In the event of a severe water shortage, the City has several emergency sources available, including Anderson Creek and Gorst Creek. Bremerton has a Water Shortage Contingency Plan that was successfully implemented during the 2001 drought. Bremerton actively educates customers on storing emergency water supplies. A countywide Emergency Water Plan is in progress. · Bremerton has two drilled wells awaiting water lights approval for use III an emergency. · Hydraulic studies such as the Gorst Creek Basin Study and the Kitsap County Groundwater Management Plan give valuable information on water quantities of the aquifers utilized by the City. · Bremerton completed a Water Reuse Feasibility Study to identify possible uses for reclaimed water. Some reuse applications are currently in place at the WWTP. · Well levels for all City groundwater sources are monitored to ensure aquifers are not being depleted. These data are entered into a computerized data base to easily determine trends. · A firm yield analysis of the Union River system was performed in 1999 to provide information to maximize, yet not over-use, the City's surface water supplies. · Bremerton has an active water conservation program described in Section 3.3 that goes beyond the minimum requirements. 3.10.2 Source Reliability - Water Quality Sources oj Supply 3-25 2005 Bremerton Water System Plan · Disinfection is also ensured throughout the distribution system through maintenance of a free chlorine residual. Weekly coliform monitoring conducted in accordance with the City's Coliform Monitoring Pl3-Tl provides feedback on disinfection adequacy. · All of the City's water quality data are tracked in a computer data base so trends and changes can be easily discerned. · Bremerton has an effective cross connection control program to prevent contamination of the water in the distribution system. · The City's annual flushing program helps protect distribution system water quality. · Reservoirs are regularly inspected to prevent entry of contaminants. · The City's corrosion control treatment facility ensures that corrosion of household plumbing does not occur. · Computerized tracking of customer water quality complaints assists in addressing distribution system issues. 3.10.3 Water Right Adequacy The City's water rights were reviewed and are presented in Section 3.4. The City currently has adequate water rights with its combined sources to meet projected demands through the planning period. 3.10.4 Facility Reliability · Section 8 describes the system analysis that was conducted to ensure adequate fire flows and to evaluate water system improvements. The City's Capital Improvement Program (CIP) outlines how improvements will be addressed. · Section 6 describes backup systems and redundancy criteria used by Bremerton for design of the system. · Bremerton has implemented most of the recommended seismic upgrades identified in the 1997 Earthquake Vulnerability Assessment, including bracing the Casad Dam intake tower, improving reservoir foundation stability, and installing several seismic valves. · All water operators and most maintenance personnel are state-certified in water distribution system operation. Bremerton has an active program of training in safety, facility operation, and regulations. This ensures responsible operation and maintenance of facilities. Sources of Supply 3-26 2005 Bremerton Water System Plan · Regular and preventive maintenance of system components, including reservoirs, wells, pump stations, valves, and fire hydrants, is tracked by a computerized maintenance management program. · The City evaluated water system facility vulnerability to seismic events in the Water System Earthquake Vulnerability Assessment (1997). Recommended actions are mostly complete and scheduled in the City's CIP. · Casad Dam and Reservoir 4 are impoundments regulated by the Department of Ecology Dam Safety Section and have written Operation and Maintenance Programs and Dam Safety Plans implemented by the City. · The chlorine facility at McKenna Falls is in compliance with its Risk Management Plan, which is implemented by the City. · All major water system facilities are visited at least daily by state-certified water operations personnel. - The SCADA system automatically calls out operations personnel when system alarm set-points are exceeded or if power outages or communication failures occur. This telemetry system is currently being converted from telephone to radio to increase reliabili ty. -The City has an Emergency Response Plan and provides training and practice drills for Water Utility personnel. 3.10.5 Customer Service Reliability - Water quality and conservation information IS posted on the City's website (www.ci.bremerton.wa.us)to communicate the value of water. - A consumer confidence report is sent in the customer bills each spring. · Bremerton has a Customer Response number (473-5920) to call to dispatch a Customer Response Technician for water service issues within two hours. · Customer calls are logged into a data base. · Customers are notified about planned flushing activities in the newspaper and on neighborhood signs. A water quality and flushing hot line (473-5490) is also available. - Customers are notified of planned water service disruptions by door hangers. · Customer water information is also disseminated at city facilities and local libraries and at special events. Sources of Supply 3-27 2005 Bremerton Water System Plan 3.11 References Casad Dam Emergency Response Plan. Army Corps of Engineering. 2000. Coliform Monitoring Plan. City of Bremerton. Updated annually. r(\n"pr"",t;(\n Pl",nn;na "Rpflll;rpTnpnt" ()l-l 100Ll. '-''-'..........-... ..'-A....l'-'.l........ ...to..4.....LI...........J.b .............."'1~.I....l.-....l..._.........u. '-'.A-..I.. .J.././ .. Earthquake Vulnerability Assessment. Dames and Moore. 1997. Energy Policy Act. 1992 Gorst Creek Basin Study. AGI Technologies. 1996. Handbook of Water Use and ConserVation. Amy Vickers. Waterplow Press. 2001. Kitsap County Groundwater Management Plan. 1997 Kitsap County Initial Basin Assessment. Economic and Engineering Services, Inc., Kramer Chin and Mayo, Pacific GroundwaterGroup, and Robinson and Noble, Inc. 1997. Kitsap County Water Reuse Evaluation and Prioritization. Golder and Associates. Draft 2005. Risk Management Plan for Chlorine. Weston, Inc. 1999. Updated by City of Bremerton 2004. Technical Memorandum - Union River Supply and Firm Yield. Economic and Engineering Services. 1999. Uncertain Future: Climate Change and its Effects on Puget Sound. Puget Sound Action Team. 2005. Washington State Water Conservation Planning Handbook. 1991. Washington State Water Reclamation and Reuse Standards. Water Reuse Feasibility Study. Brown and Caldwell. 1998. Water Rights Analysis. CH2M Hill. 2002. Water Shortage Contingency Plan. City of Bremerton. 2001. Water Utility Emergency Response Plan. City of Bremerton. 2004. Water Use Efficiency Plan (draft). City of Bremerton. 2005. Wellhead Protection Investigation. Final Report. AGI Technologies. 1996. WRIA 15 Draft Watershed Plan including technical studies prepared by Golder and Associates (concurrence not reached). Sources of Supply 3-28 2005 City of Bremerton Water System Plan Section 4 Water Quality Review and Regulatory Compliance 4.1 Objective and Approach This chapter provides a review of current state and federal drinking water regulations pursuant to the Safe Drinking Water Act (SDW A) and an assessment of the City's compliance status based on water quality data and information collected for the period 2000 to 2005. This chapter also summarizes applicable anticipated regulations and their potential implications to the City. The approach used to achieve these objectives includes the following: . Overview of the City's sources of supply . Description of current state and federal drinking water regulations . Description of upcoming reguiations that could impact the City's system . Review of existing monitoring plans, practices, and water quality data . Assessment of existing compliance status and potential future compliance issues . Proposed action plan to ensure continued compliance 4.2 Description of State and Federal Regulatory Framework The City provides 100 percent of its own drinking water and supplies water to an additional four contract customers. The City is responsible for monitoring and compliance with all SDW A and state regulations pertaining to source water and distribution system water quality that are applicable to unfiltered surface water and groundwater systems. 4.2.1 Safe Drinking Water Act The federal regulatory framework directing water quality is the SDW A of 1974 and its 1986 and 1996 amendments. The SDW A and amendments, as administered by the EP A, significantly impact the operation and monitoring of the Bremerton water systems. The regulatory impacts to Bremerton include requirements for filtration avoidance, disinfection, bacteriological quality, disinfection by-products, and source and system water quality monitoring. A '" '" \AI__L:__.l.__ ^ ~__:_:_...._-:...:..._ ,,_..:J_ "'t."-."- VVd~IIIIIHlUIII"\UIIIIIII~lIdllVe ....uue The State law that incorporates the SDW A and its amendments is Chapter 246-290 of the Washington Administrative Code (WAC 246-290). DOH is the primacy agency responsible for ensuring state drinking water laws are implemented and enforced. Both the Main System and the West 517 Zone are classified as Group A public water systems. However, according to WAC 246-290-020, the main system is classified as a community Water Quality Review and RegulatOl}' Compliance 4-1 2005 City of Bremerton Water System Plan water system (CWS), while the West 517 Zone is classified as a non-transient, non- community (NTNC) water system (with a service population of about 400). The City is required to meet drinking water quality regulations and conform to sampling and reporting requirements for these systems. 4.3 System and Supply Overview While Bremerton is responsible for meeting treatment, water quality, and monitoring regulations at its points of delivery, each of the four separate contract systems served is required to ensure compliance with water quality and monitoring requirements within its distribution systems. The City utilizes both surface and groundwater sources to meet supply needs. On a system-wide basis, about 60 percent of annual production is derived from the Union River surface source, with the remaining 40 percent obtained from groundwater production wells located throughout the service area. The City operates the Union River supply under the filtration avoidance criteria of the Surface Water Treatment Rule (SWTR), which requires watershed protection and control to maintain high quality source water. The surface supply is treated with chlorine at the McKenna Falls Intake Facility to meet the SWTR disinfection requirements for Giardia lamblia and viruses. Caustic soda is applied upstream of Reservoir 4 to adjust pH for distribution system corrosion control. The Union River surface water firm yield estimate is 2,020 million gallons per year. This supply directly feeds the West 256 and East 240 zones. The groundwater production wells are located throughout the service area and described in Section 3 and Table 4-1. Each well, with the exception of Well 19, is equipped with chlorination facilities (either gas or hypochlorite) for disinfection. The City drilled two other wells that have not yet been put into production, as they are currently pending source and water right approval. The West 517 Zone is supplied by three production wells: 15, 18R, and 19. This zone also has an intertie with the surface water transmission main. Water can move through the intertie in either direction (pumping is required to move water to the West 517 Zone but can be gravity fed into the West 256 Zone). Table 4-1 provides a reference summary of the City's sources of supply and their associated identification numbers, including City Source ID, DOH Source Number, and DOH Plant ID number. The DOH Plant ID numbers were created in 2002 to designate unique entry points to the system for monitoring purposes. Water Quality Review and Regulatory Compliance 4~2 2005 City of Bremerton Water System Plan Table 4-1 Summary of City Sources of Supply City Source ID Description DOH DOH Plant ID Source No Union River Main Stem Union River SOl T-1 West Branch West Branch Union River S02 T-1 Well1R1 Anderson Creek In progress T-2 Well 2 R1 Anderson Creek In progress T-2 Well 3 Anderson Creek S08 T-2 Well6R1 Anderson Creek Replacement In progress T-2 Well 7 Anderson Creek S12 Te2 Well 8 Anderson Creek S13 T-2 Well 9 East Bremerton S16 TA Well 13 East Bremerton S14 T-3 Well 14 East Bremerton S15 . T-5 Well 15 . Twin Lakes (West 517 Zone) S20/S0 12 N/A Well 163 Irrigation Supply Well None N/A Well 17 Gorst Creek Watershed S17 T-1 Well 18R1 Twin Lakes (West 517 Zone) S 19/5052 T-1 Well 19 Twin Lakes (West 517 Zone) S21/S032 N/A Well 20 Twin Lakes (Main System) S22 T-1 Well 214 Future Supply Well None N/A Well 224 Future Supply Well None N/A I. Replacement Wells 2. DOH source numbers were revised in 200 I when the West 517 Zone was reclassified as a separate system 3. Irrigation only; not connected to the domestic system 4. Application submitted - pending water rights approval 4.4 Water Quality Regulations Water quality regulations applicable to the City during the 2000-2005 review period are listed in Table 4-2. A discussion of each rule follows. 4.4.1 Phase I, II, and V Rules Regulatory Elements Federal Organic, Synthetic Organic and Inorganic Che111icals Phases I, II and V Rules and WAC 246-290-300 address monitoring requirements and maximum contaminant levels (MCLs) for inorganic (laC), synthetic organic (SOC), and volatile organic (YOC) ~~--~"-d~ T Tnrle- <he Phas~ TT ~~rl " Dnl=~ i\A0T ~ ~-= ~=< +~- 16 Tr\0~ 30 Cr\0S ~~rl \""Ulll}lUUll ~. U lU -1 lil 1 v Ll aHU v 1-'-UIL-,:), IVlvL.:) al..... .:')"-'l .LV! 1 .l'LIv.);, L .....:nJ\......- , Ul1U 21 YOCs. Monitoring requirements are determined by DOH based on a vulnerability assessment. WAC 246-290-300 requires these compounds to be monitored at each source on 12 to 36 month sampling cycles, depending on the contaminant and source type. Water Quality Review and Regulatory Compliance 4-3 2005 City of Bremerton Water System Plan Table 4-2 Safe Drinking Water Act Rules Rule Parameters Regulated Regulatory Milestone Effective Date Phase I Rules V olatile Organic Compounds January 1989 Phase II and V Rules Inorganic and Synthetic Organic Compounds January 1993 Arsenic Rule Arsenic January 2006 Radionuc1ides Rule Combined Radium, Gross Alpha, Beta and December 2003 Photon emitters, and Uranium . Lead and Copper Rule Lead, Copper, water quality parameters December 1992 Total Coliform Rule Total and Fecal Coliform, E. coli December 1990 . Surface Water Treatment Rule Turbidity, Giardia lamblia, enteric viruses, December 1990 Legionella, HPC Interim Enhanced Surface . Water Treatment Rule Turbidity, Cryptosporidium February 1999 Stage I Trihalomethanes, Halo acetic Acids, Chlorine February 1999 Disinfectants/Disinfection Residual, Total Organic Carbon, others Consumer Confidence Requires annual report addressing drinking September 1998 Reports Rule water quality As part of the Phase II Rule, systems with a significant amount of asbestos-cement (AC) pipe must conduct periodic asbestos monitoring in the distribution system. In Washington State, DOH historically required systems containing more than 10 percent AC pipe to comply with the monitoring requirement. These systems must collect one sample in the distribution system at a tap served by AC pipe under conditions where asbestos contamination is most likely to occur. Bremerton Status Prior to 2003, the City conducted its monitoring for inorganic and organic compounds on individual sources. However, beginning in 2003, the monitoring locations were changed to designated entry points in the distribution system to be consistent with updated state regulations. For the main system, this includes the five entry point locations identified as 1'T'"'f,1I l_rT"'~. r,-.11 A"1 T"'" 0.1_'1;'11_..(".'-1""'_ . '.L.:._" _...1 _""-_...1.L 1 .c 1-1 mrougn 1-,) III 1 aDle Lt-1. ror me YV eSl .) 1 / Lune, monlLonng IS ConUUcleu al eacn 01 . the three wells. The City maintains separate monitoring plans for the main system and West 517 Zone and conducts monitoring according to these plans. Water Quality Review and Regulatory Compliance 4-4 2005 City of Bremerton Water System Plan Main System: The City performs monitoring of primary and secondary IOCs and physical parameters according to its Main System Monitoring Plan for Inorganic Chemicals (last updated March 2005). The City currently monitors entry point T-l (which includes the Union River surface supply and Wells 17 and 20) annually for IOCs, physical parameters, nitrite, and nitrate. Sampling was most recently completed in May 2005. The City currently monitors entry points T-2 through T-5 (all of which include entirely groundwater supplies) once each three-year compliance period for IOCs, physical parameters, and nitrite and annually for nitrate. IOC monitoring for the 2005-2007 compliance cycle for entry points T-2, T-3 and T-5 is scheduled for 2007. A review of monitoring data collected since 1999 shows that the City has maintained compliance with all primary MCLs at each of these entry points. With regard to secondary inorganics and physical parameters, periodic exceedance of secondary MCLs for manganese (0.05 mg/1) and color (15 color units) has occurred. However, compliance with secondary MCLs is voluntary. The main system contains nearly 130,000 feet ofAC pipe, accounting for approximately 8.5 percent of the pipe inventory in this system. Although monitoring for asbestos was not required, the City sampled the main system in 1995 and 2004. All results were below the detection limit. The City performs monitoring of VOCs and SOCs according to its Main System Monitoring Plan for Organic Chemicals. The City is currently on a reduced monitoring schedule for VOCs, with one round of sampling required at each entry point each three- year compliance period. Sampling was most recently completed in July 2005 at each of the five entry points. All VOC results since 2000 have been below the detection limit. With regard to SOCs, the City has been eligible for waivers for its wells and Union River supply since 1993 due to their low susceptibility rating. Waivers were obtained for the periods 1993-1995, 1996-1998, and 1999-2001. The City performed entry point SOC monitoring in 2002 and 2003 as part of the Unregulated Contaminants Monitoring Rule (UCMR), and all results were below the detection limit. The City reapplied for and was granted SOC waivers for the 2005-2007 monitoring period. West 517 Zone The City performs monitoring of primary and secondary IOCs and physical parameters according to its West 517 Zone Monitoring Plan for Inorganic Chemicals. The City currently monitors each well (15, 18R, and 19) once each three-yearcompEance period for IOCs, physical parameters, and nitrite. The most recent round of sampling was performed in March 2004. A review of monitoring data collected since 2000 shows that the City has maintained compliance with all primary and secondary MCLs at each well. The City monitors each well annually for nitrate. Since 2000, the maximum nitrate observation was 1.9 mg/L as N observed at Weii 19. Water Quality Review and Regulatory Compliance 4-5 2005 City of Bremerton Water System Plan The West 517 Zone contains roughly 36,000 feet of AC pipe, accounting for approximately 60 percent of the pipe inventory in this system. According to DOH requirements, the City performs asbestos monitoring in the West 517 distribution system during the first three-year period of each 9-year compliance cycle. The most recent sample was collected in August 2004, and no asbestos was detected. The next 9-year cycle begins January 2011. The City performs monitoring of VOCs and SOCs according to its West 5 J 7 Zone Monitoring Plan for Organic Chemicals. The City is currently on a reduced monitoring schedule for VOCs, with one round of sampling required each three-year compliance period. Sampling was most recently completed in July 2005. All results since 2000 have been below the detection limit. With regard to SOCs, the City has been eligible for SOC waivers for its wells since 1993 due to their low susceptibility rating. Waivers were obtained for the periods 1993-1995, 1996'-1998, and 1999-2001 and 2002-2004. The City reapplied for and was granted SOC waivers for all sources for the 2005-2007 monitoring period. 4.4.2 Arsenic Rule Regulatory Elements The original arsenic MCL of 0.05 mg/L was established as part of the 1975 National Interim Primary Drinking Water Regulations. After years of additional health effects research and cost/benefit analysis, the EP A published the final Arsenic Rule in January 2001, with an effective date of January 2006. The Arsenic Rule revises the arsenic MCL downward to 0.010 mg/L and identifies several best available treatment technologies for compliance. Compliance with the new MCL is based on the running annual average of monitoring results at each entry point to the distribution system. The rule makes arsenic monitoring requirements consistent with monitoring for other IOCs regulated under the Phase IIIV standardized monitoring framework. However, if arsenic is detected above the MCL in any individual sample, the system must increase the frequency of monitoring at that sampling point to quarterly. Bremerton Status A review of historical IOC monitoring data indicates that all existing City water sources (both in the main system and the West 517 Zone) have arsenic concentrations less than half of the new MCL. Because of this, it is expected that the new arsenic rule will not impact the City. 4.4.3 Radionuclides Rule Regulatory Elements 1 ne original Radionuclloes Rule went into effect in 1978. The rule was reviseo III December 2000, with an effective date of 2003. The revised rule applies only to CWSs, and according to WAC 246-290-300.10, DOH has adopted the federal rule without Water Quality Review and Regulatory Compliance 4-6 2005 City of Bremerton Water System Plan additional regulation of NTNC water systems. Therefore, the rule has no impact on the West 517 system. The revised rule includes MCLs for radium-226 and radium-228, referred to as combined radium (5 pCi/L), adjusted gross alpha emitters (15 pCi/L), beta and photon emitters (4 mremlyear), and uranium (30/lg/L). Under this rule, monitoring for radionuclides must be conducted at each entry point to the distribution system. The revised rule also allows for eliminating the analysis of radium-226 and uranium if the gross alpha results are less than or equal to 5 and 15 pCi/L, respectively. The required monitoring frequency will be determined by DOH based on contaminant levels. Bremerton Status The City has a Monitoring Plan for Radionuclides. The City collected gross alpha samples for all main system entry points except T-4 (Well 9) during 2003 and grandfathered these datato reduce new monitoring requirements (note that Well 14 was considered part of entry point T - 3 during the 2003 monitoring but has since been designated as T-5). Since all gross alpha results were below 5 pC ilL, the City is not required to conduct radium-226 or uranium sampling at these sources. Testing for entry point T -4 (Well 9) has resumed now that the well is back in service. The City was also required to test for radium-228. Although federal regulations require quarterly radium-228 sampling, DOH required that the City complete two sampling events separated by approximately six months. The City is awaiting these results. DOH will direct water systems regarding future radiological monitoring requirements. Bremerton has not been designated vulnerable to beta particle aJld photon emitter radioactivity and has not been required to monitor for these parameters. 4.4.4 Lead and Copper Rule Regulatory Elements Lead and copper are metals that may be found in household plumbing materials and water service lines. Lead ingestion has been linked to several adverse health impacts, including impaired physical and mental development in infants and children. Copper can cause aesthetic issues in addition to acute and chronic health impacts. The Lead and Copper Rule (LCR) establishes monitoring requirements, action levels, and compliance requirements to control the levels of these constituents in drinking water. Under the LCR, water systems are required to conduct monitoring at customers ' taps to determine if more than 10 percent of homes meeting certain criteria exceed the lead and copper action levels of 0.015 mg/L and 1.3 mg/L, respectively. The LCR specifies required actions for systems exceeding the 90th percentile levels. In January 2000, EP A published minor revisions to the LCR. The purpose of the Lead and Copper Rule Minor Revisions (LCRMR) was to eliminate unnecessary requirements, reduce monitoring and reporting burdens, and promote consistent national implementation. Water Quality Review and RegulatOlY Compliance 4-7 2005 City of Bremerton Water System Plan Bremerton Status Main System The City has remained in compliance with the LCR action levels since corrosion control facilities were installed in March 1999. The facilities, which are located at the entrance to Reservoir 4, include a caustic soda feed system to raise the finished water pH above 7.7 prior to distribution. Since 2001, the City has raised its finished water pH target range to between 8.4 and 8.6 to help minimize the formation of certain disinfection byproducts within the distribution system. Between 1999 and 2000, the City completed two rounds of post-treatment lead and copper monitoring at 60 customer taps. In each round, the 90th percentile results were below the lead and copper action levels; therefore, the City became eligible for reduced tap monitoring (i.e., 30 samples per event). The City completed two rounds of reduced tap monitoring in July 2001 and July 2002, respectively, and the 90th percentile results remained below the action levels. Since 2002, the City has been required to conduct reduced monitoring at customer taps once every three-year cycle. The most recent round of tap monitoring was performed during the first half of 2005, and the 90th percentile results were 0.005 mg/L for lead and less than 0.2 mg/L for copper. Lead and copper monitoring results since 1999 are summarized in Table 4-3. The next round of customer tap sampling is scheduled for 2008. Table 4-3 Main System Lead and Copper Rule Monitoring Results # of 90th Percentile Result (mg/L) Sampling Date Samples Lead Copper (Action Level 0.015) (Action Levell.3) September 1999 60 0.010 0.26 June 2000 60 0.013 0.22 July 2001 32 . 0.002 <0.2 July 2002 33 0.007 <0.2 First Half2005 30 0.005 <0.2 The City is also been required to complete Water Quality Parameter (WQP) monitoring for pH at the system entry point and at several locations within the distribution system. Entry point pH samples are required at minimum biweekly at the outlet of Reservoir 4. Under the regular schedule for pH monitoring within the system, the City is required to conduct tworounds with at least 10 distribution samples during each six-month period. In 2004, DOH approved the City's recommendation for optimal WQP (OWQP), which included a minimum entry-point pH of 7.7 and minimum distribution system pH of 7.1. The City collected 17 entry point pH samples and two rounds of at least 10 distribution system samples during each six-month period in 2005. All samples were in agreement with the OWQP; therefore, the City qualified for reduced monitoring. Water Quality Review and Regulatory Compliance 4-8 2005 City of Bremerton Water System Plan West 517 Zone Following designation of the West 517 Zone as a separate small water system in 2001, the City performed two rounds of monitoring for lead and copper, with 10 customer taps sampled each round. As shown in Table 4-4, the 90th percentile results were well below the respective action levels, thus qualifying the West 517 Zone for reduced monitoring. In addition, since the 90th percentile lead results were less than or equal to 0.005 mglL and the 90th percentile copper results were less than or equal to 0.65 mglL, the West 517 Zone qualified for accelerated reduced monitoring. The accelerated reduced monitoring requirements require the collection of five tap samples once every three-year cycle. The City completed monitoring in July 2005, and the next round of tap sampling is scheduled for 2008. No requirement exists for WQP monitoring at entry points or within the distribution system, since the West 517 Zone has remained compliant with lead and copper action levels and is considered a small system. Sampling Date # of 90th Percentile Result (mgfL) Samples Lead Copper (Action Level 0.015) (Action Level 1.3) September 2001 10 0.005 <0.2 February 2001 10 0.004 <0.2 July 2005 5 0.0038 <0.2 Table 4-4 West 517 Zone Lead and Copper Rule Monitoring Results 4.4.5 Wellhead Protection Program Regulatory Elements According to WAC 246-290-135(3), public water systems are required to implement a Wellhead Protection Program (WHPP) to protect their groundwater supplies. Source water protection programs are planning tools to be used by water utilities to identify potential sources of water contamination and to protect existing and future drinking water supplies. The objective is to minimize risk of accidental releases of contaminants in areas contributing water to the public water supply system. The three basic elements of a source water protection plan are: . Definition of the Wellhead Protection Area (WHP A) for the area of recharge directly contributing to a water supply. A WHP A is defined as an area contributing to a source 'vvithin a.specified ~mount of time. o Inventory of land uses and identification of potential sources of contamination within the WHP A or watershed. . Management strategies including emergency spill response and contingency plans to minimize or eliminate the possibility of potential contamination of the water supply. Water Quality Review and RegulatOlY Compliance 4-9 2005 City of Bremerton Water System Plan Bremerton Status In 1996, the City prepared a WHPP for its well supplies in the Gorst Creek basin, Anderson Creek watershed, and Manette peninsula. As part of this effort, the City developed a conceptual hydrogeologic model for each of the aquifers, completed vulnerability assessments, determined the time of travel zones for each source using the EP A General Particle Tracking (GPTRAC) method, initiated the formation of a countywide Wellhead Protection Committee (Kitsap County Groundwater Guardians), delineated the WHP As for each source, completed inventories of potential contaminant sources, and notified those sources regarding their inclusion in a WHP A. The City has continued to survey the WHP A every two years for contaminant occurrence, and the Critical Areas Ordinance limits potentially contaminating activities within the WHP As. Regarding emergency planning, contamination of an individual aquifer could impact Bremerton's supply capabilities. However, the aquifers utilized by Bremerton's wells are separated hydrogeologically, and contamination would likely be contained to a single aquifer. The contingency plan for such an emergency would be to use supplemental well sources, apply for emergency water rights on Wells 21 and 22, and rely more on the surface water source in the interim. 4.4.6 Total Coliform Rule Regulatory Elements The Total Coliform Rule (TCR) requires water systems to monitor their distribution system for the presence of coliform bacteria, a surrogate used to indicate possible contamination from fecal bacteria. The City performs monitoring as outlined in its existing Coliform Monitoring Plan and Addendum to Bremerton Coliform Monitoring Plan, the latter created specifically for the West 517 Zone. Monitoring is required at representative sites on a monthly basis, with the sample quantity dependant on the size of the population served. Community water systems with service populations between 50,001 and 59,000 (e.g., main system) are required to take 60 representative samples monthly throughout the system. Non-community water systems with service populations between one and 1,000 (e.g., West 517 Zone) are required to take one representative sample from the system if no coliform detection existed during the previous month and five representative samples if any coliform was detected during the previous month. All samples testing positive for total coliform must be followed by repeat sampling and additional testing to determine if E. coli is present. The Surface Water Treatment Rule (SWTR) and WAC 246-290-694(3)(a) include several additional provisions for coliform monitoring in unfiltered surface water systems. These ~n,...lll,-1~ thP f"'"r\lL::a.,...t-1r\n Af r\~~ f"'"^1;-t^~ Co:l.'tn~l~ TlPar th. po first cpr"1r"'p {"'o("\nnp-rot1f\,n P-:lroh rl";"f J,..l.l.V.l.U'U.'-' .L.l.lV VV.l.l""'-'L.lV.l.l VL V.lJ.,"" VV.LJ..I..V.I..I..l.J. U'u.J.J...Ip V .lA-V .1 L.L...... .L.l L '"'VI. V.1VV VV.lll.lVVL.lUJ.J. VUY.lJ. '-1-uy the source turbidity exceeds 1.0 NTU, the colleCtion of one fecal coliform sample from the surface supply each day that the turbidity exceeds 1.0 NTU, and the collection of one coliform sample at the entry point to the distribution each day that routine or repeat coliform samples are collected from within the system. According to the SWTR, surface water fecal coliform sampling is also required at least five days per week. This Water Quality Review and Regulatory Compliance 4-10 2005 City of Bremerton Water System Plan requirement is further addressed later in the description of the Surface Water Treatment Rules. Under the TCR, two types of violations exist: acute and non-acute. An acute MCL violation for coliform is based on the presence of either fecal coliform or E. coli in a repeat sample or coliform presence in a repeat sample collected as a follow-up to a sample indicating the presence of fecal coliform or E. coli. A non-acute MCL violation for coliform occurs under the following conditions: a system collecting 40 or more coliform samples per month (corresponding to a service population of at least 33,001) has more than 5 percent of the routine samples taken in one month test positive for the presence of total coliform, or a system collecting fewer than 40 coliform samples per month has more than one coliform detection. Bremerton Status Main System The City collects at least 60 routine coliform samples per month at locations throughout the main system, as well as entry-point coliform sampling each day that routine or repeat samples are collected. Of the 4,687. routine distribution system samples collected from 2000 to 2005, only 29 samples (0.7 percent) tested positive for coliform. Of these, four tested positive for E. coli. In all cases, the City collected repeat samples in accordance with the provisions of WAC 246-290-320, and none confirmed the coliform presence indicated in the routine samples. The City also complied with the requirements to collect source water fecal coliform and system entry-point coliform samples on days when the maximum turbidity exceeded 1.0 NTU. No acute or non-acute violations existed during this period. West 517 Zone The City typically collects two routine system samples per month from the West 517 Zone (unless a positive coliform detection existed the previous month, in which case the City collects five routine samples). Of the approximately 120 routine distribution system samples collected from 2001 to 2005, no samples tested positive for coliform or E. coli. No acute or non-acute violations occurred during this period. 4.4.7 Surface Water Treatment Rules Regulatory Elements The Surface Water Treatment Rule (SWTR) was issued in 1989 and applies to water systems using surface water or groundwater under the influence of surface water (GUI). The SWTR addresses filtration, disinfection, and regulation of Giardia lamblia, viruses, Legionella, heterotrophic plate count (HPC) bacteria, chlorine residual, and turbidity levels of finished water. As an unfiltered system, the City is required to comply with the filtration avoidance criteria addressed in WAC 246-290-690, which inciudes source water monitoring and quality requirements, disinfection criteria, watershed control and protection requirements, and monitoring requirements. Water Quality Review and RegulatOlY Compliance 4-11 2005 City of Bremerton Water System Plan The Interim Enhanced Surface Water Treatment Rule (IESWTR) was issued in 2001 and builds upon the SWTR without replacing it. For unfiltered surface supplies, the IESWTR requires addition of Cryptosporidium to the watershed control program wherever Giardia lamblia is mentioned. This includes the identification and monitoring of activities that may impact microbial water quality. The IESWTR also includes disinfection profiling and microbial benchmarking provisions based on system-wide disinfection by-product (DBP) levels. Watershed Control Program The SWTR requires the development, documentation, and implementation of a watershed control program (WCP) for unfiltered surface supplies. According to the requirements of WAC 246-290-135(4), the WCP must address watershed hydrology and characteristics, land ownership, activities that may adversely affect source water quality, security and access-related issues, and monitoring provisions. Also, for unfiltered surface supplies, DOH must complete a sanitary survey once every five years and annual on-site inspections to ensure adequacy of the watershed control program. The WCP has been updated with this WSP. Source Water Quality Conditions For unfiltered surface supplies, the SWTR requires source water monitoring of fecal coliform density and turbidity. According to requirements in WAC 246-290-694, the City must collect fecal coliform samples on at least five separate days each week, including whenever the source water turbidity exceeds 1.0 NTU. To remain in compliance, the fecal coliform density must be less than or equal to 20/1 00 mL in 90 percent of samples for the previous six months, and the turbidity cannot exceed 5.0 NTU when the supply is used unless DOH determines that the event was: . The result of unusual or unpredictable circumstances or; . No more than two events occurred in the last 12 months, or no more than five events in the last 120 months. The SWTR permits operational adjustments, including temporary source shutdown during turbidity episodes, providing that alternate supplies and/or finished water storage are available and can be used to meet system demands. Compliance with the total coliform MCL is also a required component of the filtration avoidance criteria unless it can be shown that the violation was not related to source or treatment deficiencies. n;"i... ro,;tinnllofl U;"OJn ont<;: ~.u....,~~..~.. ---"1n.. ~'''_'._~ For unfiltered surface waters, SWTR treatment requirements for Giardia lamblia and enteric viruses must be met through disinfection. The disinfection requirements require adequate CT (disinfectant concentration multiplied by contact time) be provided such that 3-log (99.9 percent) inactivation of Giardia ,lamblia and 4-log (99.99 percent) inactivation of enteric viruses is achieved each day, resulting in inactivation ratios greater Water Quality Review and Regulatory Compliance 4-12 2005 City of Bremerton Water System Plan than or equal to one. Regarding Cryptosporidium, the IESWTR required a minimum of2- log (99 percent) removal for filtered systems but did not impose any removal or inactivation requirements for unfiltered systems. System Water Quality Conditions After treatment, the SWTR requires a minimum disinfectant residual of 0.2 mglL at the point of entry to the distribution system at all times. Additionally, a detectable disinfectant residual must be present in at least 95 percent of all distribution system samples collected at the same time and location as coliform samples, according to WAC 246-290-451. Alternatively, samples may be analyzed for heterotrophic plate count (HPC) bacteria. An HPC level of 500 colony forming units per milliliter (cfulmL) or less is considered equivalent to a detectable disinfectant residual. Bremerton Status The City does not regularly pump surface water through the intertie to the West 517 Zone and only uses it when CTs are met at Pump Station 3. Therefore, regulations pertaining to the surface supply only apply to the main system. Since 1992, Bremerton has successfully maintained its non-filtration status under the SWTR. The source waters utilized by the City are excellent based on the following facts: · Surface water quality continues to meet the requirements for filtration avoidance, and · All groundwater sources appear to be hydraulically isolated from the influence of surface water. Table 4-5 provides a summary of the City's compliance status with regard to SWTR requirements. These items are further discussed in the following sections. Since the last WSP update in 1999, the following major changes and/or improvements to the watershed, McKenna intake facilities, treatment (screening, chlorination), and/or transmission have been made: · The Utility contracts with the Bremerton Police Department for after hours facility inspections; · Seismic bracing of the dam intake tower; and · Security upgrades to various facilities in response to post 9-11 concerns. Water Quality Review and Regulatory Compliance 4-13 Table 4-5 Surface Water Treatment Rule Criteria for Filtration Avoidance Parameter Criteria Bremerton Status Turbidity Sample for turbiditYPlior to disinfection every 4 hours the system serves the public or continuously with City samples continuously. State permission. System is out of compliance any time the turbidity level exceeds 5.0 NTU unless State detennines high Automatic system shutdown prevents water with Turbidity turbidity caused by unusual or unpredictable circumstance, no more than two events occun'ed in past 12 months, or no more than five events occul1'ed in past 120 months elevated tUlbidity from entering distIibution system. . Turbidity/Colifonn Every day the turbidity measurement exceeds I NTU, the system must take colifolm measurements before City in compliance. the first customer is served. Cohlonn Must comply with limits on fecal colifonn for source water' (fecal colifonn:::: 20/1 00 mL in 90 per'cent of City in compliance, samples for previous 6 months this systern served public . Meet disinfection requirements including specified CT times for 99.9 per'cent inactivation of Giardia lamblia Disinfection cysts and 99.99 per'cent inactivation of enteric viruses. CT requirements vary depending upon water' City in compliance, ternper-ature and pH Disinlection CT lor system must be calculated daily based upon peak daily flows to deterlnine contact times City in compliance. Disinfection system redundant components include an auxilimy power supply or an automatic shut-off of Disinfection water to the distribution system whenever there is less than 0.2 mglL of residual disinfectant at entrance to City has both provisions. distlibution system Water'shed Control Must maintain a watershed contml progl1lm to restrict human activities and the potential for contmnination Conducted according to DOH approved plan (last by Gim'dia lamblia cystsand Cryptosporidium oocysts updated in 2006,) Water'Shed Control Complete annual DOH water'Shed surveys, , and complete system sanit31Y surveys every five yeal'S Last DOH Sanit31Y survey conducted in Septernber' 2004. WateJ'Shed Control Must have an annual on-site inspection to assess wateJ'Shed control progmm and disinfection treatment DOH perfonns annually. process. Water Quality Review and RegulatOlY Compliance 4-14 2005 City of Bremerton Water System Plan Union River Watershed Control Plan The City owns approximately 2,904 acres (98 percent) of the Union River watershed, with the other 60 acres under outside ownership of Trinity Broadcasting and the Department of Natural Resources. In 1996, the City completed Utility (Volume I) and Forest (Volume II) Land Management Plans that address general management of City owned land, including the Union River watershed. The City completed the City of Bremerton Watershed Control Program to further define specific precautions taken to protect the watershed. The WCP, which was approved by DOH, addresses watershed hydrology, characteristics, land ownership, and security/access protocol. The original plan was designed to address the 1989 SWTR and its provisions adopted by DOH regarding requirements for remaining an unfiltered source (WAC 246-290-690). Those provisions provided for more detailed monitoring of activities within the watershed, restricted access gates, and enhanced watershed patrol and enforcement. According to the requirements of the IESWTR, the WCP was updated in 2001 specifically to address control of Cryptosporidium. The most recent update to the WCP was in 2006. Union River Watershed Water Quality The City collects Union River water supply samples for determination of fecal coliform density according to the monitoring requirements in WAC 246-290-694. Owing to the high quality of the surface supply, the City has maintained compliance with the filtration avoidance criterion that at least 90 percent of samples over any running six-month period have fecal coliform concentrations less than 20/100 mL. The observed frequencies of fecal coliform concentrations below 20/1 OOml for the Union River System Intake (consisting of the main stem with the seasonal addition of the West Branch) since 2000 has have averaged 97.6% percent, while the minimum six-month period was 95.5% percent. The City conducts continuous on-:line monitoring of raw water turbidity at the McKenna Falls Intake facility during periods when the surface supply is in use. Figure 4-1 depicts the maximum daily turbidity observations from January 2002 through December 2005. Over this period, the maximum daily turbidity was less than 1.0 NTU rougWy 86 percent of the time. No occasions occurred where the delivered water exceeded 5.0 NTU. The City does have automatic intake shutdown capabilities should the source turbidity approach 5.0 NTU. Bremerton generally shuts down at turbidities much less than this. Water Quality Review and Regulatory Compliance 4-15 2005 City of Bremerton Water System Plan 30 Maximum Daily Turbidity of the Union River Water Supply 2.5 2.0 S E- ~ ..q15 "0 :0 ... " E- 1.0 I I I' i II I ! ,I JIll I r, ,I ~~ljJ~ ' I ~flj~J I "H)4 ), ~l NI il H t'l ~ , iill! i ~ ~ IU!l '! ~ 111~ II ~ If ii J ~j~ ,~! ~.~ , I ,,,,,,' " 'i .ilr""i I' I,' ~l,]- '-!~ ' 4LI,)i;!~V ~"'" ,l ~i!!jf1~W , I I I i I; ! i I i i i i i j i I \ \ ~ ' G..,. ! I III i Jj II Iii I III I ~~ i"JIII d I : ~ 11!ill!' I ' ~~!~ ~ III,', iJ,IJMIII"II~,\,~~Ji ,1.1 11m'l! t~ If~ ~, .'!,II~'J1, ;''l.i!~ ~'I' 1'~ 11111 1~1 ~r 'w" , 1 I rl I I ; I~i II! 'i ii, I!ii! ,',-.,'-' 'I . r ~I I! I! i ill r~i Iii I I"', ", '1'1~~!11 ill "1 ! \ Iii " ~"~!~I' .11 ,\!, III, ~i 0.5 0.0 , 1/02 4/02 7/02 10/02 1/03 4/03 7/03 10/03 1/04 4/04 7/04 10/04 1/05 4/05 7/05 10/05 Figure 4-1 The City also performs voluntary environmental monitoring at several locations within the Union River watershed in order to characterize water quality trends and ensure the adequacy of its watershed control program. Monitoring is performed according to the Monitoring Plan for the Union River Reservoir (last updated July 2004). A variety of parameters, including nutrients, total organic carbon (TOC), algae, phyto- and zoo- plankton, and physical characteristics, are assessed monthly. Disinfection The City feeds chlorine gas at McKenna Falls (and Wells 17 and 20) for primary disinfection within the McKenna transmission pipeline. The disinfection compliance point for the surface supply is the entrance to Reservoir 4. The City monitors chlorine residual, pH, and temperature at four locations along the transmission main and uses these data along with peak hourly flow measurements for each segment to determine the overall CT achieved en route to Reservoir 4. Based on a review of daily CT profiles since January 2002, the City has provided overJ-logGiardia lamblia inactivation each day the surface supply was in use, with typical inactivation ratios between 2 and 6. The CT required for 4-log inactivation of viruses is much less than that for 3-log Giardia lamblia; therefore, the City has maintained compliance with both requirements. System Water Quality The City adjusts the chlorine feed rate to provide a target residual of 1.1 to 1.4 mglL at the entrance to the distribution system at Reservoir 4. Experience shows that this target, Water Quality Review and Regulatory Compliance 4-16 2005 City of Bremerton Water System Plan along with individual dose targets for each of the chlorinated well supplies, has been adequate to ensure a detectable chlorine residual throughout the system. The City also maintains an automated system to shut down the surface intake if the residual drops below a low-level set point, ensuring compliance with the 0.2 mg/L entry-point requirement. The City monitors chlorine residual within the distribution system at least once per day and at the same time and location as routine and repeat coliform sampling. Based on a review of daily monitoring records from January 2002 through December 2005, the City performs an average of 77 chlorine residual samples per month. For all months during this period with the exception of September 2004, all samples contained a detectable residual and/or an HPC level below 500 cfu/mL. In September 2004, two of 97 samples (2 percent) contained no residual and had HPC levels above 500 cfu per mL, which is still in compliance with the requirements. Therefore, the system has remained in full compliance with the distribution system water quality requirements of the SWTR. 4.4.8 Stage 1 Disinfectants/Disinfection By-Products Rule Regulatory Elements Disinfection by-products (DBPs) result from the reaction of natural organic matter (NOM) and various inorganic precursors with chemical disinfectants. Toxicological research has shown that many DBPs have carcinogenic and other adverse properties when ingested for long periods of time. In 1979, the EPA enacted the Total Trihalomethane Rule, which set an interim MCL for total trihalomethanes (TTHM) of 0.1 mg/L as a running annual system-wide average based on quarterly monitoring within the distribution system. This rule applied to water systems using a chemical disinfectant and serving over 10,000 customers. In 1998, the EP A promulgated the Stage 1 Disinfectants/Disinfection By-Products (D/DBP) Rule to further reduce the DBP levels in drinking water. The Stage 1 D/DBP Rule, which applies to all CWS and NTNC water systems that apply a primary or secondary chemical disinfectant to their water supply, became effective in January 2002 for large systems (those serving 10,000 or more people) and January 2004 for small systems (those serving less than 10,000 people). The Stage 1 D/DBP Rule established new MCLs for chlorite, bromate, and the sum of five haloacetic acids (HAAS) (0.060 mg/L) and established maximum residual disinfection levels (MRDLs) for chlorine (4.0 mg/L), chloramines, and chlorine dioxide. It also lowered the MCL for TTHM (0.080 mg/L) and set total organic carbon removal requirements for systems using conventional filtration. The DBP monitoring requirements under the rule depend on the system size (large or small) and source of supply (surface water or groundwater). For the main system, which is considered a large surface water system under the rule, routine monitoring requirements include the collection of four paired (i.e., both TTHM and HAAS) samples per quarter per plant (i.e., designated entry point) operated any time during that quarter. Water Quality Review and Regulatory Compliance 4-17 2005 City of Bremerton Water System Plan At least 25 percent of all samples collected each quarter must be from locations representing maximum residence time in the system. The remaining samples must be taken at locations representing average residence time in the distribution system and representing the entire system, taking into account number of persons served, different sources of water, and different treatment methods. For the West 517 Zone, which is considered a small groundwater system under the rule, routine monitoring requirements include the collection of one paired sample per year per plant (i.e., designated entry point) during the month of warmest water temperature at a location of maximum residence time. Compliance with the respective MCLs is determined based on the running annual arithmetic average (RAA) of quarterly averages. Quarterly averages are determined using a flow-weighted average of individual plant averages. For both the main system and the West 517 Zone, chlorine residual samples must be collected at the same time and location as coliform samples. Compliance with the chlorine MRDL is based on theRAA, computed quarterly, of monthly averages of all samples from each system. Reduced monitoring is permitted under the rule if the RAA of TTHM and HAA5 results drop below 0.04 mglL and 0.03 mglL, respectively, over a 12-month sampling period. However, full sampling must be re-implemented if RAA TTHM levels exceed 0.06 mglL or HAA5 levels exceed 0.045 mglL. Bremerton Status Main System Prior to implementing the Stage 1 D/DBP Rule, the City submitted to DOH a technical report entitled, Determination of "Treatment Plant" for Compliance with the Federal Disinfectants/Disinfection Byproducts Rule. This report provided justification for the use of the four plant designations T -1 through T -4 (See Table 4-1 ). Well 14 was considered part of plant T-3 (rather than T-5), since it draws from the Manette Sea Level Aquifer along with Well 13. For each of the plant locations, four distribution sample locations, one representing maximum residence time and three representing average residence time, were selected using zones of influence determined from the Bremerton water system model. The City began quarterly monitoring under the rule in January 2002 in accordance with its Monitoring Plan for Compliance with the Disinfectants/Disinfection Byproducts Rule (last updated August 2004). After the first quarter of 2003, the RAAs for TTHM and U 11 A ~ . nrC>orp r\ 0'1' 1 ~o-jT' '0nA lco.C'S thr:ln '~'o+C>ol"tr)~lD T'CH"'__CU-..t~"'TL::.l'T T"ha-ro+r'\.....L::lo. t"hDo r~t"(, .J..Lll.....l ~-' VVv......... v.v...!.l .u...lElJ...J_ u..l~U .Lv.,:) _ .u~u..l~ UVL'-'VLULJ.l':',.. 1.V':>'pv.\";uV~.lJ. ~.l.l\".ll,""J.V.lv, l.lJ...... \.......-l~y qualified for reduced monitoring, which has required the collection of one paired TTHM and HAA5 sample per quarter per plant taken at the location representing maximum residence time. The City has remained on the reduced monitoring schedule since April 2003. Water Quality Review and Regulatory Compliance 4-18 2005 City of Bremerton Water System Plan Figure 4-2 depicts the main system monitoring results for TTHM and HAA5 since January 2002. The City has continued to meet both the Stage 1 MCLs as well as the levels necessary to remain on the reduced monitoring schedule. The maximum RAA for TTHM (0.051 mg/L) and HAA5 (0.036 mg/L) occurred in the first quarter of 2004. The highest single TTHM observation (0.073 mg/L) occurred at the maximum residence time for plant T-1 in the third quarter of 2004. The highest single HAA5 observation (0.066 mg/L) occurred at the maximum residence time for plant T-2 in the second quarter of 2003. Main System Disinfection Byproduct Monitoring Results 100 80 ::r ): c, 60 . .-3- ~\ :!: is. \ :I: 40 fa/f \\\ 1= 20 '<'''./ ' '. . 0 N N N N M M M M ~ ~ ~ ~ on on on on 0 cr cr 0 0 cr cr 0 0 cr s: 0 0 cr cr cr ~ .... "3 ..!. ~ .... "3 ..!. ~ 0. ..!. ~ 0. "3 (5 0- <.) 0- <.) ;::l <.) >-, -<C >-, 0 >-, -<C >-, 0 >-, -<C >-, 0 >-, -<C >-, 0 1- M CL --0-- RAA -/lr- T-1 --.g-- T-2 .... T-3 ;( T-4! ::r en ..;:l. 10 <( <( :I: 0 N N N N M M M M ~ ~ ~ 0 cr s: 0 0 cr s: cr 0 cr s: ~ ..... ..!. .~ .... (5 ~ .... 0- ;::l <.) 0. ;::l 0. ;::l >-, -<C >-, 0 >-, -<C >-, 0 >-, -<C >-, ..;- on o 0 t> ~ o >-, on on 9 :I 0. ;::l -<C >-, on o ..!. <.) o I ! I I I I i I I ; J i - MCL-.:..o- RAA-&- T-I -m- T-2 -+- T-3 ;( T-4: ; I=i......." .lL? . .~_...... --..-- Water Quality Review and Regulatory Compliance 4-19 2005 City of Bremerton Water System Plan The City collects an average of 77 distribution system chlorine residual measurements each month from the main system, with individual sample results ranging from non-detect to 1.2 mg/I. Since January 2002, the main system chlorine RAA has varied between 0.6 mg/L and 0.79 mg/L; therefore, the City has remained in compliance with the chlorine MRDL. West 517 Zone For the purposes of Stage 1 DBP monitoring and compliance, Wells 15, 18, and 19 are considered to be a single plant, since they all draw from the same aquifer. The monitoring requirements became effective for this system in January 2004, as it serves less than 10,000 people. The City collects its annual samples in August, the month of warmest water temperature and has met the respective MCLs during both 2004 and 2005 sampling. In August 2004, the TTHM and HAA5 results were 0.0058 and 0.0037 mg/L, respectively. In August 2005, the TTHM and HAA5 results were 0.004 mglL and non- detectable, respectively. The City collects an average of two distribution system chlorine residual measurements each month from the West 517 Zone, with individual sample results ranging from 0.19 - to 1.44 mg/L. Since January 2002, the West 517 Zone chlorine RAA has varied between 0.6 mg/L and 1.06 mg/L; therefore, the City has remained in compliance with the chlorine MRDL. 4.4.9 Consumer Confidence Reports and Public Notification Rule Regulatory Elements Under the Consumer Confidence Report (CCR) Rule promulgated in 1998, water systems are required to provide an annual CCR on the source of their drinking water and levels of any contaminants found. According to WAC 246-290-72001, these reports are only required of community water systems and do not apply to the West 517 Zone. The annual report must be supplied to all customers and must include: · Information on the source of drinking water · A brief definition of terms · If regulated contaminants are detected, the MCLG, MCL, and the level detected · If an MCL is violated, information on health effects · If EP A requires it, information on levels of unregulated contaminants WAC 246-290-72001 While the CCR provides annual "state-of-the-water" reports, the Public Notification Rule (PNR) directs utilities in notifYing customers of acute violations when they occur. The PNR was revised in May 2000 and outlines public notification requirements for violations of MCLs, treatment techniques, testing procedures, monitoring requirements, and a variance or exemption. If violations have the potential for "serious adverse effect," Water Quality Review and RegulatOlY Compliance 4-20 2005 City of Bremerton Water System Plan consumers and the State must be notified within 24 hours of the violation. The notice must explain the violation, potential health effects, corrective actions, and the need for consumers to use an alternate water source. Notice must be made by appropriate media or posted door-to-door. Less serious violations must be reported to consumers within 30 days in an annual report or by mail or direct delivery service within one year, depending on the severity of the violation. Bremerton Status The City's first CCR was distributed in October 1999. As required, the City has distributed CCRs to its customers prior to July 1 each year since 1999. The City's 2005 CCR is located on-line at http://www.ci.bremerton.wa.us 4.4.10 Operator Certification The 1996 SDW A amendments require that states develop and implement an operator certification program. The regulation sets out minimum guidelines for such a certification program, including operator classification and qualifications. These sections of the regulation require that: · Each treatment facility and/or distribution system be placed under the direct supervision of a certified operator; · Operator certification must be equal to or greater than the system classification being operated; · At least one certified operator be available on every shift; · Operators must pass a validated exam demonstrating skills, knowledge, ability, and judgment necessary for the system classification; and · Each operator has a high school diploma, GED, or State approved experience and training. While the responsibility for developing the program lies with DOH, systems such as Bremerton are required to bring all operators up to the level of certification as required. Bremerton Status As discussed in Chapter 6, Operation and Maintenance Program, all water system managers, supervisors, and operators have the appropriate water certification from DOH. 4.5 Promulgated Water Quality Regulations Recent water quality regulations applicable to the City are listed in Table 4-6. A discussion of each rule follows. Water Quality Review and RegulatOlY Compliance 4-21 2005 City of Bremerton Water System Plan Long Term 2 Enhanced Surface Cryptosporidium Promulgated: January 2006 Water Treatment Rule Effective: March 2006 Stage 2 Disinfection By-products T rihalomethanes, Haloacetic Promulgated: January 2006 Rule Acids Effective: March 2006 Table 4-6 Promulgated Rules Under the Safe Drinking Water Act 4.5.1 Long Term 2 Enhanced Surface Water Treatment Rule Regulatory Elements The Long Term 2 Enhanced Surface Water Treatment Rule (LT2ESWTR) was published in the Federal Register on January 5, 2006. The rule was developed as part of the Stage 2 Microbial/Disinfection By-Products cluster, which was intended to improve public health protection against waterborne pathogens, specifically Cryptosporidium, while addressing risk trade-'-offs associated with exposure to chemical disinfectants and DBPs. The LT2ESWTRappliesto public water systems that distribute or wholesale surface water or groundwater under the direct influence of surface water (e.g., Subpart H systems). It builds upon, without replacing, the requirements of the SWTR and IESWTR. The LT2ESWTR seeks to lower the concentration of Cryptosporidium in finished drinking water supplies to less than one oocyst per 10,000 liters. The approach involves the identification of source water vulnerability to Cryptosporidium occurrence and implementation of treatment and control strategies appropriate to the level of risk. For the first time, the LT2ESWTR imposes Cryptosporidium treatment requirements for unfiltered surface water systems. This was mandated to ensure a comparable level of public health protection similar to filtered systems. The rule also contains requirements for disinfection profiling and benchmarking as well as measures to protect uncovered finished water storage reservoirs from contamination risks. The key elements of the rule applicable to the City of Bremerton include: · Initial source water monitoring · Determination of mean Cryptosporidium concentration · Disinfection profiling and benchmarking · Implementation of treatment options from the microbial toolbox · Future source water monitoring /nitialSource Water Monitoring Under the L T2ESWTR, surface water systems that serve 10,000 or more people (e.g., large systems) must conduct monthly source water monitoring of Cryptosporidium for 24 consecutive months. Historical data may be "grandfathered," providing they meet specific eligibility requirements established in the rule. Water Quality Review and Regulatory Compliance 4-22 2005 City of Bremerton Water System Plan Disinfection Requirements The LT2ESWTR requires that unfiltered surface water systems provide Cryptosporidium treatment via disinfection. The level of inactivation required is either 99 percent (2-log) or 99.9 percent (3-log), depending on the mean oocyst concentration determined from the initial source water monitoring period. Unfiltered systems will be required to use chlorine dioxide, ozone, or ultraviolet (UV) irradiation to meet the Cryptosporidium inactivation requirement and at least two separate disinfectants in order to meet the combined Cryptosporidium, Giardia lamblia, and viral inactivation requirements. Each disinfectant must be able to achieve the total inactivation required for Cryptosporidium, Giardia, or viruses separately. Disinfection Profiling Disinfection profiling involves tracking the inactivation of specific pathogens over a period of time. The LT2ESWTR includes disinfection profiling and benchmarking requirements to ensure water systems maintain adequate protection against microbial pathogens as they take steps to simultaneously comply with the Stage 2 DBP Rule. Water systems will be required to develop Giardia and virus disinfection profiles and calculate microbial benchmarks if they plan to make a significant change to their disinfection practice following the initial source water monitoring period. A significant change is defined as moving the point of disinfectant application, changing the disinfectant, and/or changing the disinfection process. Future Source Water Monitoring Water systems will be required to conduct additional monitoring in the future to confirm or revise the initial assessment of source water quality. The additional monitoring will be required beginning six years after initial bin classification. Over the next several years, the EP A may modify the sampling or analytical requirements from those required for the initial round of monitoring. ) Bremerton Status The City of Bremerton will need to comply with the LT2ESWTR for its Union River Supply according to the schedule established for water systems serving 50,000 to 99,999 people. Since the Main Stern and West Branch supplies are blended prior to collection and treatment, they are considered a single source under the rule. Initial Source Water Monitoring As part of its Watershed Control Program, the City has been periodically monitoring source water at the Union River reservoir for Cryptosporidium since 1994. Generally, between two and four samples are collected each year. Since sampling is not performed monthly, the historical Cryptosporidium data will not be acceptable for grandfathering. Therefore, the City will be required to either complete 24 months of source water monitoring (beginning no later than April 1, 2007) or submit its intent to provide 3-log Cryptosporidium inactivation (assuming it retains its unfiltered status). The City will be Water Quality Review and Regulatory Compliance 4-23 2005 City of Bremerton Water System Plan required to develop a source water sampling schedule and provide it to the EP A no later than January 1, 2007. The estimated analytical cost for each Cryptosporidium sample is $450 (year 2006 $). Assuming 24 source water samples plus two required matrix spikes are collected, the cost to complete initial monitoring is estimated at $12,000. In November 2005 (prior to promulgation of the final rule), the City prepared a draft Long Term 2 Enhanced Surface Water Treatment Rule Monitoring Plan. The plan will be reviewed and updated as necessary to ensure it conforms to the requirements of the final rule. Disinfection Requirements The City currently uses only chlorine disinfectant to meet the SWTR inactivation requirements for Giardia lamblia and virus. If it elects to keep the Union River supply unfiltered, the City will be required to implement an additional disinfectant (chlorine dioxide, ozone, or UV irradiation) for Cryptosporidium inactivation. Each disinfectant must be able to achieve the total inactivation required for Cryptosporidium, Giardia lamblia, or viruses separately. The City must have the new disinfection facilities installed and on-line no later than October 2012 unless a separate compliance agreement is negotiated with DOH. As part of this WSP update, the City is evaluating approaches to comply with the additional Cryptosporidium treatment requirements. Disinfection Profiling Although the City will be required to provide an additional disinfectant barrier to meet the Cryptosporidium inactivation requirement, it would only be required to profile and benchmark if it elected to modify its existing chlorination practices. The City currently performs monitoring along the transmission pipeline leading from the McKenna Falls intake to Reservoir 4 in order to determine Giardia lamblia inactivation and residual at the system entry point. These data (and the calculated daily profiles) may be eligible for grandfathering. The City would consult with DOH in advance of making any changes to its existing chlorination practices. 4.5.2 Stage 2 Disinfectants/Disinfection By-Products Rule The Stage 2 DBP Rule was published in the Federal Register on January 4,2006. The rule was developed to provide more equitable protection against DBPs on a system-wide basis by changing the compliance monitoring provisions. The Stage 2 DBP Rule applies to community and NTNG water systems that serve drinking water treated with aprimary Ar C"~r>^nrlan.r roh" O"1""Y\~,....t:ll r1-~~~~-tDor-t~-nt Tho S. fa. go. "") titi"[) D.....1a r1~DCI tho. +All"yn,;",rr-- V.i. .::>vvv lU ~J \,..1.1 vl.L.llvU.1 U.l0.l.1.1.LvVLUJ..1. .1. 11'-' l v ~ .L-'J.JJ. .L'\..U.1V uvv.::> l.l.lv .1.VJ.IV vv 111.5- . Changes the method of calculating DBP regulatory compliance to a locational running annual average (LRAA) of quarterly samples, in which the system calculates a running annual average for each DBP monitoring location instead of calculating a rulliling allilua1 average for the entire system. Water Quality Review and Regulatory Compliance 4-24 2005 City of Bremerton Water System Plan · Re-establishes the location and number of OBP monitoring sites. The rule requires systems to conduct an Initial ~istribution System Evaluation (lOSE) to select Stage 2 OBP monitoring locations in areas of the distribution system with elevated OBP levels. Additionally, the final Stage 2 OBP Rule requires systems to determine monitoring requirements based on population. · Establishes DBP operational evaluation levels for each monitoring site. These levels are calculated as 25 percent of the sum of the two previous quarter's results plus twice the current quarter's monitoring result. A system exceeding this level is required to conduct an operational evaluation or evaluate their distribution system operations to determine ways to reduce OBP levels. The system is required to notify the state of an operational evaluation level exceedance and submit evaluation results within 90 days of the exceedance. · Requires consecutive systems purchasing drinking water carrying a disinfectant to implement Stage 2 OBP requirements on the same schedule as the largest water system in their combined distribution system. The first step in complying with the Stage 2 OBP Rule is conducting an lOSE with the goal to identify areas with routinely higher OBP concentrations than other areas in the distribution system and use this information to select monitoring locations for long-term Stage 2 OBP compliance monitoring. The lOSE requirement can be met in four ways: . Very Small System Waiver - Systems serving less than 500 customers that qualify for this waiver are exempt from IDSE requirements. · 40/30 Certification - This approach allows systems to meet the lOSE requirement by certifying that all individual Stage 1 TTHM and HAA5 compliance monitoring results or equivalent OBP data collected over a specified 2-year period have met the following criteria: TTHM :S 0.040 mg/L and HAA5 :S 0.030 mg/L. Systems must submit the required documentation to the primacy agency. . Standard Monitoring Program (SMP) ~ Systems conduct one year of monitoring in the distribution system to identify high OBP locations and must submit a SMP Plan and lOSE report to the primacy agency as part of the lOSE process. . System Specific Study (SSS): o Using Existing Monitoring Oata - Systems can meet lOSE requirements using existing monitoring data. The EPA has established criteria the existing data must meet in order to be used to meet the SSS requirement. Systems must submit an SSS Plan and/or lOSE Report to the primacy agency as part of the lOSE process. o tT~~~n u,~~.-f~o:l111~;" l\-if^d~l ~'(Tstems c~:'" rYlpp.t Tns")':; -ro.rn"'~""'Do.ynOr\tC" 11D~-nrT .-:. "'-1:7notDr '-' ~J.J.J.b .1...1.. J \J.J. U.U..l..L"-' 1.1'.l.'-1 "-'.J. - U.J L .1..L..1. U.1J._ 1.1.1'-""-'''' .l...L...' .L.. 1. 'v"1 U-J.J. v.l.ll........l.ll.:J UL:>.L.l.l6' a vv U\..\...o.1 distribution system hydraulic model. The EP A has established criteria the hydraulic model must meet in order to be used for lOSE compliance. Systems must submit an SSS Plan and IDSE Report to the primacy agency as part of the lOSE process. Water Quality Review and Regulatory Compliance 4-25 2005 City of Bremerton Water System Plan Consecutive systems purchasing some or all of their water from another system and systems that sell water wholesale must comply with the Stage 2 DBP Rule on the same schedule as the largest system in the combined distribution system. A combined distribution system is the interconnected distribution system consisting of the distribution systems of wholesale systems and consecutive systems receiving finished water from the wholesale system(s). However, Stage 2 sampling requirements are based on the retail population served by each individual system, not the combined distribution system. The Stage 2 DBP Rule compliance schedule is shown in Table 4-7. Table 4-7 Stage 2 DBP Rule Compliance Schedule Population of System Submission Date Completion Schedule or Largest System in for IDSE Plan or Date for Start Date for Stage 2 Combined 40/30 IDSE Report Compliance Monitoring Distribution System Certification 1 2: 100,000 Oct. 1,2006 Jan. 1,2009 Apr. 1,2012 2 50,000 - 99,999 Apr. 1,2007 Jul. 1,2009 Oct. 1 2012 3 10,000 - 49,999 Oct. I, 2007 Jan. 1,2010 Oct. 1,2013 4 < 10,000 Apr. 1, 2008 July 1, 2010 Oct. 1,2013 Bremerton Status Main System The main system will need to comply with Schedule 2, which requires submission of an IDSE plan no later than April 1,2007. The main system will not be eligible for an IDSE 40/30 waiver, since some sample results since October 2004 have exceeded 0.040 mg/L for TTHM and 0.030 mg/L for HAAS. With regard to Stage 2 compliance monitoring, the City will ultimately need to select a total of eight monitoring locations within the main system (three for maximum TTHM, three for maximum HAAS, and two existing. Stage 1 monitoring locations). Monitoring of these sites will be required no later than October 1, 2012, at which point the LRAA compliance approach will take effect. Based on historical DBP data from Stage 1 sampling, it appears the City may be able to comply with the Stage 2 DBP Rule without making major treatment or operational changes. However, the Stage 1 sampling locations may not be representative of maximum TTHM and HAAS locations within the system. The IDSE will be required to identify these worst-case sites. As part of this WSP update, the City is evaluating its IDSE compliance options. West 517Zone Since the West 517 Zone is a NTNC system serving fewer than 10,000 people, the City will not have to complete IDSE requirements for this system. The City will still be required to comply with the routine Stage 2 monitoring requirements and .MCLs according to Schedule 4 in Table 4-7. For groundwater systems serving less than I 0,000 people, the rule requires the collection of paired samples at two sites per plant once per Water Quality Review and Regulatory Compliance 4-26 2005 City of Bremerton Water System Plan year. The sites should represent locations of maximum TTHM and HAAS, respectively. Therefore, the City will be required to provide a monitoring plan to DOH with justification of the sites selected. 4.6 Anticipated Regulations Several new or revised regulations are anticipated over the next six years. It is important the City remain apprised of the development of these regulations. Table 4-8 presents a listing of anticipated regulations, current schedule target dates, and potential regulated parameters. A brief summary of each of the anticipated regulations follows. Table 4-8 Anticipated Regulations Under the Safe Drinking Water Act . Anticipated Regulation Parameters Regulated Date Unregulated Contaminants 26 parameters Proposed: Plug. 2005 Monitoring Rule 2 Final Expected: 2006 Radon Radon Proposed: Nov. 1999 Final Expected: 2008 Lead and Copper Rule Lead, Copper, water quality parameters Proposed Expected: Early 2006 Revisions Final Expected: Late 2006 PercWorate PercWorate Unknown Pltrazine Pltrazine Unknown MillE MillE Unknown Groundwater Rule Viruses, fecal indicators Proposed: May 2000 Final Expected: Late 2006 Total Coliform Rule Total Coliform, Fecal Coliform, E. Coli Proposed Expected: 2007 Revisions 4.6.1 Unregulated Contaminant Monitoring Rule 2 In August 2005, the EP A proposed a second Unregulated Contaminant Monitoring Rule that includes two lists of contaminants for which some systems will be required to monitor. All public water systems serving more than 10,000 people will be required to conduct assessment monitoring for 11 contaminants on the Assessment Monitoring List at distribution system entry points. Systems serving more than 100,000 people and selected smaller systems will be required to conduct screening monitoring for 15 contaminants on the Screening Survey List This list includes contaminants that will be monitored at distribution system entry points and within the distribution system. This monitoring \vill be req"uired during" a: 1.2~month period between 2007 and 2010. Bremerton Status The City will likely be required to conduct assessment monitoring for 11 contaminants on the Assessment Monitoring List (i.e., List 1) at distribution system entry points for the main system. Water Quality Review and Regulatory Compliance 4-27 2005 City of Bremerton Water System Plan 4.6.2 Radon Rule A proposed Radon Rule was released in November 1999 providing two options for the maximum level of radon allowable in community water supplies. The SDW A has directed the EP A to not only propose and finalize an MCL for radon in drinking water, but also to make available a higher alternative MCL (AMCL) accompanied by a multimedia mitigation (MMM) program to address radon risks in indoor air. The proposed MCL is 300 pCi/L, and the proposed AMCL is 4,000 pCi/L. The drinking water standard that would apply to the City depends on whether or not the State develops a MMM program. However, it is likely that these preliminary standards will change if the MMM program becomes regulated under the EP A Indoor Air Office. Bremerton Status Radon sampling conducted in 1994 at all wells showed radon levels ranging between 80 and 255 pCi/L, all below the proposed MCL of 300 pCi/L. It does not appear as though the rule will impact the main system, and the rule as proposed does not apply to NTNC systems such as the West 517 Zone. 4.6.3 Lead and Copper Rule Revisions The EP A initiated a review of LCR implementation in 2004 to determine if national lead levels are increasing. As a result of this effort, the EP A identified a series of areas in which changing the existing regulation would be beneficial. Table 4-9 lists the nine areas that will be revised. The EP A anticipates issuing proposed revisions in early 2006. Water Quality Review and Regulatory Compliance 4-28 2005 City of Bremerton Water System Plan Table 4-9 Proposed Revisions to the Lead and Copper Rule Activity Proposed Rule Revision Revision Obiective Clarify language that speaks to the number of samples To address confusion about sample collection. required. _......__......._..___..__......._____..._.______..._..___.___....____.._____m__........______.__..___. Clarify language regarding the number of locations To address confusion about sample collection. from which samples should be collected. __.........._____.__.___.__.__.._h......._.._.__.__..______.___________._ Modify definitions for a monitoring period and To address inconsistencies between guidance and Monitoring compliance period. ..... __..._r_:~~~.~i~~~_:__________________.______________.__.___ ............._..__m...__.___...._...__..______....__......._.__.............._....._........m_....___... ...--........- Modify language to make it clear that all samples must To ensure that samples collected reflect effectiveness of _____!?:_.~~:? wit~!~...!~.~~_I!l:_:~I.:.I1~~~)'_:~:.._____.______ corrosion control. m.. ..._..............._....._...__.__.._..........._..........._..._.....Hm.__.__........_m__......._...___.___._._ Modify language to reconsider allowing large systems above the action level to reduce tap monitoring based To ensure that systems over the action level maintain a solely on the results of their water quality parameter sense of the degree of exposure in the community. monitoring. Modify language to require that a public water system To allow states an opportunity to provide input on the Treatment notify the state of treatment changes 60 days prior to utility's decision or required additional monitoring a treatment change rather than 60 days after a prior to a change in treatment that could affect change. corrosion control. To increase awareness for homeowners who participate in Add language to require that utilities provide occupant tap monitoring programs and parents, students, and notification ofthe results of monitoring. staff at schools that are required to monitor for lead in f-..------.----.--.---....-.--.-.....----...---.---------.-.--..---..---...-- ___.~.!:!~kin~~a~:::....__________________________ Public Relations To address concerns about the appropriateness of flushing Revise language to permit states to allow utilities to guidance included in current public education modify the premise piping flushing directions in public education language to address local language. Guidance will be provided to states and circumstances. utilities to help them determine an appropriate flushing time to recommend to customers. Lead Service Line Revise language to require that any line previously To ensure that service lines testing below the action level Replacement deemed to be replaced through testing be re- are not considered permanently "replaced" and (Bremerton does not evaluated in the event that a subsequent treatment removed from the utility's inventory, but are instead retested after any major changes to treatment that have these) change causes the system to exceed the action level. could affect corrosion control. Bremerton Status The proposed revisions to the LCR could have minor impacts to the City's monitoring schedules and public relations and notification requirements. The City will update its lead, copper, and pH monitoring plans appropriately. 4.6.4 Groundwater Rule The Groundwater Rule (GWR) was proposed in May 2000 to meet the requirements of the 1996 SDW A Amendments, which require disinfection of groundwater supplies, if np('p""~ny fr\r nllhli(' hp~lth nrr\tpf'tiAn ThPAhipf'tiup r\f thp nuro i" tr\ rp,'ll1f'p thp n111-.1if' 1.1.......................'-".......1. , .1.'-'.1. y~"-"............. .1...........-..1.'-.1..1. y.1'O.J.............Il.-.........,.I.... ... ........... ......,'-'J............Il......,..... '-'.I. .............. '-" ..,.......... .I.>..J .........., ......................._....... ........._ l:-'IL...I.~.I...L..... risk of exposure to waterborne pathogens from fecal contamination. This type of contamination may reach groundwater supplies through various sources, such as septic systems or stormwater runoff. Water Quality Review and Regulatory Compliance 4-29 2005 City of Bremerton Water System Plan The GWR applies to all water systems that distribute groundwater not treated to 4-log (99.99 percent) inactivation or removal of viruses. For the purposes of compliance with the proposed GWR, sources that are treated and continuously achieve 4-log inactivation or removal of viruses are considered to be "disinfected." The sources that are treated but do not meet this criterion are not considered to be "disinfected" sources. The proposed GWR has five major components: · System sanitary surveys conducted by the State to identify significant deficiencies; · Hydrogeologic sensitivity assessments conducted by the State for ground water sources that are not disinfected; · Source water monitoring for indicators of fecal contamination by systems that do not disinfect and also rely on a hydrogeologically sensitive aquifer or have detected fecal indicators within the system's distribution system; · Compliance monitoring for systems that disinfect to ensure they reliably achieve 4-log inactivation or removal of viruses; and · Corrective action by any system with significant deficiencies or positive microbial samples indicating fecal contamination. System Sanitary Survey The GWR will require states to conduct sanitary surveys for all groundwater systems at least once every three years. At a minimum, the surveys must cover the following elements: · Source · Treatment · Distribution system · Finished water storage · Pumps and pump facilities and controls · Monitoring/reporting/data verification · Water system management and operations · Operator compliance with state requirements Within 30 days of conducting each survey, the State must provide each system with a list of observed significant deficiencies. After receiving a list of significant deficiencies, systems have 90 days to take action to correct the deficiencies or submit a plan to the State for making these corrections. For the proposed GWR, a significant deficiency is a defect in design, operation, or maintenance or a failure or malfunction of the sources, treatment, storage, or distribution system the State determines to be causing or has potential for causing the introduction of contamination to the water delivered to consumers. Water Quality Review and Regulatory Compliance 4-30 2005 City of Bremerton Water System Plan According to the proposed rule, systems that treat groundwater sources for 4-log inactivation or removal of viruses or that have an outstanding performance record in all the sanitary survey elements with no TCR violations since the last survey may move to a surveying schedule of once every five years. Hydrogeologic Sensitivity Assessment The proposed GWR requires states to identify systems with higher likelihood for contamination by waterborne pathogens from fecal contamination. Assessing hydrogeologic sensitivity for all non-disinfecting groundwater sources will identify these systems. Hydrogeologic sensitivity will be determined by the state using the type of aquifer as a sensitivity indicator. The EP A indicates that wells obtaining water from a karst, fractured bedrock, or gravel aquifer are sensitive to contamination unless protected by a hydrogeologic barrier. If a physical barrier is present, this can void the determination that an aquifer is "sensitive," but the specific criteria for such an exemption will be developed by individual states. Source Monitoring The GWR requires three types of monitoring: (1) routine monitoring; (2) triggered monitoring; and (3) monitoring for systems with disinfected groundwater sources. Routine monitoring requirements apply to sources that are not disinfected and are considered to be hydrogeologically sensitive. Triggered monitoring requirements apply to systems with grQundwater sources not considered disinfected and producing positive total coliform samples in the distribution system. These monitoring requirements are intended to identify the possible presence of fecal contamination at the source. Monitoring for disinfected sources verifies that continuous 4-log inactivation of viruses is achieved. Corrective Action The GWR requires water systems to implement specific actions after evidence of contamination has been found in their system. If the State notifies a system of a significant deficiency, the system must correct the deficiency, provide an alternate water source, or implement treatment to reliably achieve 4-10g inactivation or removal of viruses. If the system determines the Source water is contaminated, the system must do at least one of the following: eliminate the source of contamination, correct the significant deficiency; provide alternate source water, or provide treatment to reliably achieve at least 4-10g inactivation orremoval of viruses. Bremerton Status . The GWR couldi1llpact gIoundwater supplies inboth the main system and the West 5i7 Zone. The City currently provides chlorine disinfection at each well with the exception of Well 19. It is unknown whether the existing chlorination practices are capable of providing 4-10g virus inactivation and would be classified as "disinfected" under the GWR. If the City wishes its well supplies to be considered "disinfected," it will have to demonstrate the ability to continuously achieve 4-log virus inactivation to DOH and then Water Quality Review and RegulatOlY Compliance 4-31 2005 City of Bremerton Water System Plan operate the disinfection systems to ensure this criterion is always met (e.g., provide continuous monitoring and notify DOH any time chlorine residual falls below the state- determined residual disinfectant concentration for more than four hours). For sources that are not disinfected or for which the City does not wish to pursue "disinfected" status, the City is prepared to cooperate with the state in its evaluation of hydrogeologic sensitivity and the additional measures needed at each well to ensure compliance with the GWR. 4.6.5 Total Coliform Rule Revisions As part of its six year review of existing regulations, EP A has determined the need to revise the TCR. Revisions may include requirements to address finished water quality in the distribution system and evaluate additional or alternative monitoring strategies that would be more cost-effective and maintain or improve public health. As part of the process for determining the appropriate revisions to this rule and the need for a future Distribution System Rule, a series of white papers were developed by EP A and other groups in 2002 to describe potential health risks in the distribution system. These papers covered the following topics: . Intrusion . Cross-connection control . Aging infrastructure and corrosion . Permeation and leaching . Nitrification . Biofilms and bacterial growth . Covered storage . Decay in water quality over time . New or repaired water mains In addition, EP A and the American W ater Works Association are currently preparing issue papers related to developing revisions to the TCR. These papers will cover the following distribution system topics: · Indicators of water quality · Effectiveness of disinfectant residual e Compliance with the existing TCR · Hazard analysis and control strategies · Accumulation of inorganic contaminants · Nutrient availability · Causes of contaminant events and positive coliform samples e Total coliform sample invalidation Water Quality Review and Regulatory Compliance 4-32 2005 City of Bremerton Water System Plan Bremerton Status The date for a proposed revised TCR rule and/or Distribution System Rule is uncertain at this time. However, any developments with either rule will likely have an impact on the City. It is quite possible these rules will include the use and documentation of best management practices within the distribution system. Cross connection control may be a primary focus. As part of this WSP update, a detailed review of the City's cross connection control program was conducted and is described in Section 6. 4.6.6 Potentially Regulated Contaminants In addition to these anticipated regulations, the City will track potential regulations by keeping up-to-date with the Contaminant Candidate List (CCL). The CCL is the primary source used by the EP A for establishing priority contaminants that may face future regulation. In February 2005, the EP A issued the second CCL, which is comprised of 51 contaminants (nine microbial and 42 chemical) included on the previous list. The CCL-2 includes at least three parameters, namely atrazine, methyl-t-butyl ether (MtBE), and perchlorate, that the drinking water industry anticipates will be regulated in the future. The EP A will determine whether the CCL-2 contaminants should be pursued for future regulations in August 2006. Bremerton Status As part of its VOC monitoring efforts, the City also analyzes for MtBE. Samples for each of the five designated entry points in the main system and the three wells in the West 517 Zone have been non-detectable for MtBE. As part of the UCMR monitoring in 2002 and 2003, the City analyzed for perchlorate in each of the main system designated entry points. All results were below the detection limit. Should these contaminants be regulated in the future, it does not appear as though the City's current sources would be affected. 4.7 Summary of Regulatory Status A review of monitoring procedures and water quality results from 2000 to 2005 indicates the City has been in full compliance with all effective federal and state drinking water regulations for both its main system and the West 517 Zone. Table 4-10 provides a summary of applicable effective and promulgated regulations, the City's compliance status, and action plans. The recently promulgated L T2ESWTR and Stage 2 DBP Rule will each have a significant impact on the monitoring, treatment, and operations of the City's water systems. By April 2007, the City will develop and submit plans forCryptosporidium monitoring of its Union River supply and its IDSE approach for the main system. By October 2012, the City will provide additional treatment of its surface supply to remove or inactivate Cryptosporidium. Also in 2012, the City will begin monitoring nev/ly selected DBP sites and convert to the more rigorous LRAA compliance approach. Water Quality Review and Regulatory Compliance 4-33 2005 City of Bremerton Water System Plan Table 4-11 provides a summary of water quality monitoring requirements for both the main system and the West 517 Zone. The table includes parameters to be monitored and current sampling location and frequency. This table is intended to be a guide; detailed requirements are available in WAC 246-290 and by contacting DOH. Based on the current monitoring frequencies, Tables 4-12 and 4-13 summarize the City's water quality monitoring schedule for the main system and the West 517 Zone, respectively, for the period 2006 through 2011. The estimated analytical costs (in year 2006 dollars) for these monitoring schedules are summarized in Table 4-14. Water Quality Review and RegulatOlY Compliance 4-34 2005 City of Bremerton Water System Plan Table 4-10 Summary of Applicable Existing and Promulgated Regulations Regulation Reouirements Bremerton Status Compliance? Recommendation Main System: Plan Written Plan updated in 2006 Yes Maintain updated plan per W517 Zone: Plan WAC 246-290-300 Total Coliform updated in 200 I Rule Monitoring Main System: Ongoing Yes Maintain monitoring records W517 Zone: Ongoing for 5 years Watershed Control Main System: Plan Maintain updated plan per updated in 2006 Yes Plan (WCP) W5l7 Zone: NA WAC 246-290-690 Surface Water Treatment Rule Monitoring Main System: Ongoing Yes Continue with monitoring W517 Zone: NA WCP update with Main System: Plan Maintain updated plan per Cryptosporidium updated in 2006 Yes WAC 246-290-690 Interim Enhanced control W517 Zone: NA Surface Water Treatment Rule Monitoring Watershed monitoring Yes Continue with monitoring on-gomg. Main System: Draft Update the monitoring plan Written Plan Plan developed By Jan 2007 as necessary per elements Long Term 2 W517 Zone: NA of the final rule. Enhanced Surface Water Treatment Rule Start by April 2007 Monitoring Future Requirement By Apr 2009 Complete by April 2009 Main System: Plans Written Plan updated in 2005 Yes Maintain updated plan per W517 Zone: Plans WAC 246-290-300 Phase I, II, and V updated in 2004 Regulations Monitoring Main System: Ongoing Yes Continue with monitoring W517 Zone: Ongoing and renewal of waivers Water Quality Review and RegulatOlY Compliance 4-35 2005 City of Bremerton Water System Plan Table 4-10 (Continued) Summary of Applicable Existing and Promulgated Regulations Treatment Main System: Continue with WQP Completed in 1999 Yes Optimization W5l7 Zone: NA monitoring Lead and Copper Monitoring Main System: Ongoing Yes Tap samples required in W5l7 Zone: Ongoing 2008 for both systems Consumer Distribute water Main System: Update plan as needed and Confidence Distributed annually Yes Report quality reports W517zone: NA distribute every year. Main System: Plan Written Plan updated in 2004 Yes Maintain updated plan per W517 Zone: Plan WAC 246-290-690 Stage 1 updatediri 2004 D/DBP Rule Monitoring Main system: Ongoing Yes Continue with monitoring W517 Zone: Ongoing Main system: Need to Prepare IDSE Plan by April Written Plan complete IDSE Future 2007. Complete IDSE and W517 Zone: Need to submit report by 2009 Stage 2 select future sites DBP Rule Monitoring Future Requirement Future Routine system monitoring by 2012/2013 Water Quality Review and Regulatory Compliance 4-36 2005 City of Bremerton Water System Plan Table 4-11 Summary of Water Quality Monitoring Requirements Parameter Regulation Samoling Location(s) Current FreQuency Organic Compounds Phase I, Phase II, Phase V Designated entry points Once every 3 years (or waived) and WAC 246-290 Inorganic Compounds Phase II, Phase V and WAC Designated entry points GW: Once every 3 years 246-290 SW: Once per year Physical Parameters Phase II, Phase V and WAC Designated entry points GW: Once every 3 years 246-290 SW: Once per year Phase II, Phase V and WAC Distribution system served by Main system: Not applicable Asbestos 246-290 AC Pipe West 517 Zone: Once every 9 years Nitrate Phase II, Phase V and WAC Designated entry points Once per year 246-290 Nitrite Phase II and WAC 246-290 Designated entry points GW: Once every 3 years SW: Once per year Lead and Copper Rule and Reservoir 4 and distribution Reservoir 4: Biweekly Water Quality Parameters (pH) WAC 246-290 system locations System: Each 6-month period Lead and Copper Lead and Copper Rule and Customer taps Main system: Once every 3 years WAC 246-290 West 517 Zone: Once every 3 years Radionuclides (Gross Alpha and Radionuc1ides Rule and Designated entry points DOH will provide guidance Radium-228) WAC 246-290 Disinfection Byproducts (TTHM Stage I D/DBP Rule and Designated system locations Main system: Quarterly and HAA5) WAC 246-290 West 5 17 Zone: Once per year Total Coliform Rule and Representative of distribution Main system: At least 60 per month Total Coliform WAC 246-290 system and entry point West 517 Zone: At least one sample per month Fecal Coliform Surface Water Treatment Surface water supply before At least 5 samples per week Rule treatment Turbidity Surface Water Treatment Surface water supply before Continuously during periods of use Rule treatment Chlorine Residual Surface Water Treatment Reservoir 4 entry point and Reservoir 4: Continuously during use. Rule distribution system System: Monthly with colifonn Water Quality Review and Regulatory Compliance 4-37 2005 City of Bremerton Water System Plan Table 4-12 Sampling Schedule for Main System (2006 through 2011) Parameters 2006 2007 2008 2009 2010 2011 QI Q2 Q3 Q4 QI Q2 Q3 Q4 QI Q2 Q3 Q4 QI Q2 Q3 Q4 QI Q2 Q3 Q4 QI Q2 Q3 Q4 Volatile Organic Compounds . . Synthetic Organic Compounds Waiver Period Waiver Period Waiver Period Inorganic Compounds at T-I (I) . . . . . . Inorganic Compo at T-2 to T-5(1) . . Radionuclides Will be scheduled by DOH Nitrate-Nitrogen . . . . . . Lead and Copper . . Stage I TTHM and HAA5 . 0 . . . . . . . . . . . . . . . . . . . . . . Stage I Chlorine Residual . . . . . . . . . . . . . . . . . . . . . . . . Total Coliform - Dist. System . . . . . . . . . . . . . . . . . . . . . . . . . . Fecal Coliform - Union River . . . . . . . . . . . . . . . . . . . . . . . . Cryptosporidium - Union Fliver . . . . . . . . . Consumer Confidence RepOt1 . . . . . . I. See Table 4-1 for description of entry point designations T-I through T-5. Water Quality Review and Regulatory Compliance 4-38 2005 City of Bremerton Water System Plan Table 4-13 Sampling Schedule for West 517 Zone (2006 through 2011) Parameters 2006 2007 2008 2009 2010 2011 QI Q2 Q3 Q4 QI Q2 Q3 Q4 QI Q2 Q3 Q4 Ql Q2 Q3 Q4 Ql Q2 Q3 Q4 Ql Q2 Q3 Q4 Volatile Organic Compounds . . Synthetic Organic Compounds Waiver Period Waiver Period Waiver Period Inol'ganic Compounds . . Nitrate-Nitrogen . . . . . . Lead and Copper . . Asbestos . Stage 1 TTHM and HAA5 . . . . . . Stage I Chlorine Residual . . . . . . . . . . . . . . . . . . . . . . . . Total ColifonTI - Dist. System . . . . . . . . . . . . . . . . . . . . . . . . Water Quality Review and Regulatory Compliance 4-39 2005 City of Bremerton Water System Plan Table 4-14 Summary of Analytical Costs for Continued Regulatory Compliance ($2006) Parameters Unit Cost Year 2006 2007 2008 2009 2010 2011 VOC Suite $175 $0 $0 $1,400 $0 $0 $1 ,400 SOC Waiver $3,110 $0 $0 $3,110 $0 $0 $3,110 lOC Suite (inc. Nitrate) $320 $502 $1,384 $1,678 $502 $1,384 $1,678 Lead and CODDer $25 $0 $0 $875 $0 $0 $875 Radionuc1ides $135 $0 $0 $1;350 $0 $0 $1,350 Asbestos $175 $0 $0 $0 $0 $0 $175 Unregulated Contaminant Monitoring Rule $600 $0 $0 . $5,000 $5,000 $0 $0 Total ColifOlm (Dist. System)\a) $18 $15,120 $15,120 $15,120 $15,120 $15,120 $15,120 Fecal ColifOlU1 (Union River) $22 $6,600 $6,600 $6,600 $6,600 $6,600 $6,600 Heterotrophic Plate Count\O) $25 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 Total Triha10methanes (TTHM)\C) $80 $1,360 $1,360 $1,360 $1,360 $1,360 $1,360 Haloacetic Acids (HAA5)\C) $140 $2,380 $2,380 $2,380 $2,380 $2,380 $2,380 Cryptosporidi urn! Giardia lamb lia (d) $450 $0 $4,500 $5,850 $1,350 $0 $0 Consumer Confidence Report $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 Total Estimated Annual Analytical Costs $42,000 $47,400 $60,800 $48,400 $42,900 $50,100 (a) Assumes 70 samples per month (62 within the main system and W5l7 zone and 8 entry-point) (b) Assumes 20 samples per month within the distribution system (c) Does not include DBP monitoring conducted as palt of the Initial Distlibution System Evaluation (lOSE) A separate cost analysis for the lOSE compliance approach is provided in a conCUITent Tech Memo. (d) Assumes monthly Cryptosporidium monitoring conducted from April 2007 to April 2009 Water Quality Review and Regulatory Compliance 4-40 4.8 Laboratory Certification Table 4-15 summarizes the certified laboratories that provide analytical services for all required monitoring conducted by the City of Bremerton. Table 4-15 Laboratories Used by the City of Bremerton for Drinking Water Analysis Name Certifications Analvsis Washington State Department Washington State Radionuclides, Radon of Health Laboratory Twiss Analytical Laboratory Washington State IOCs, Lead and Copper, Total Coliform, Fecal Coliform, E. coli, Heterotrophic Plate Count Edge Analytical Laboratory Washington State SOCs (UCMR), TTHM, HAA5, TOe, VOCs, Alkalinity LabCor, Inc. Washington State Asbestos Grants Pass Laboratory Federal EP A Cryptosporidium, Giardia lamblia Water Environmental Services, None required for Zooplankton, Phytoplankton Inc. plankton analysis Aquatic Research, Inc. Washington State Nutrients, TOC, UV254 4.9 References Long Term 2 Enhanced Surface Water Treatment Rule Monitoring Plan (Cryptosporidium). City ofBremerton. Main System. November 2005. Monitoring Plan for Compliance with the Disinfectant/Disinfection Byproducts Rule. City of Bremerton. Water Supply System. August 2004. Monitoring Plan for Compliance with the Disinfectant/Disinfection Byproducts Rule. City of Bremerton. West 517 Zone. January 2004. Monitoring Plan for Inorganic Chemicals. City of Bremerton. Main System. March 2005. Monitoring Plan for Lead and CopperRule. City of Bremerton. Main System. April 2004. Monitoring Plan Lead and Copper Rule. City of Bremerton. West 517 Zone. August 2004. Monitoring Planforlnorganic Chemicals. City of Bremerton. West 517 Zone. May 2004. Monitoring Plan for Organic Chemicals. City of Bremerton. Main System. July 2004. Monitoring Plan for Organic Chemicals. City of Bremerton. West 517 Zone. July 2004. Monitoring Plan for Radionuclides. City of Bremerton. Main System. March 2005. Water Quality Review and Regulatmy Compliance 4-41 Monitoring Plan for Radionuclides. City of Bremerton. West 517 Zone. May 2004. Monitoring Plan for Union River Reservoir. City of Bremerton. Main System. July 2004. Water Quality Monitoring Plan. Coliform Monitoring Plan. System ID #08200R. 2005. Water Quality Monitoring Plan, Introduction and Water System Description. Main System. System ID #08200R. 2004. Water Quality Monitoring Plan. Introduction and Water System Description. West 517 Pressure Zone. August 2005. Water Quality Review and RegulatOlY Compliance 4-42 2005 Bremerton Water System Plan Section 5 Transmission and Distribution System - 5.1 Introduction The transmission and distribution system for Bremerton's Main System is comprised of seven pressure zones, 291 miles of pipe, 16 treated water reservoirs, 10 pump stations, five booster pump stations, more than 20 pressure-regulating valves, two zone interties, and five interties with other water systems. The transmission and distribution system compnsmg Bremerton's West 517 Zone System includes one pressure zone with 11 miles of pipe, two treated water reservoirs, one pump station, one firelbooster pump station, four pressure-regulating valves, and one intertie with the Bremerton Main System. A detailed description of these facilities is provided in this section. 5.2 Pressure Zones The City of Bremerton Main System's six pressure zones serve customers in East and West Bremerton and are named accordingly as shown below. The West 580 Zone is currently under construction and anticipated to be in operation before the end of 2006. West Bremerton . W256 . W 440 . W580 (to be completed in 2006) . W 650 East Bremerton . E240 . E398 . E490 The Bremerton West 517 Pressure Zone System consists of only one pressure zone, which is the West 517 Pressure Zone. These pressure zones are illustrated in the Water System Schematic (Figure 1-3). Hydraulic gradients within the zones are generally controlled by the water levels in the system reservoirs. Service pressures within the zones are maintained at acceptable levels under normal, peak, and emergency operating conditions. A pressure of 30 psi must be available at all service connections under peak hourly demand conditions. Five small closed zones are served by booster pump stations. A description of each pressure zone is presented in Table 5-1. Transmission and Distribution System 5-1 Pr"ssu re Zone Source Capacity Facility GPM Reservoir Capacity Table 5-1 General Pressure Zone Information A vg Day Demand Major Users Redundancy Provisions for Power Outages ~Gm~v{G!Fij{ij~i\'fER11i&jjfi~lSMSJllJ!; Surface supply 12,500 PS 2 (All AC wells) 4,000 Well] 7 735 Well 20 1,150 W517/W256 intertie 600 W 440/W256 intertie 320 W256 via Booster Station 9 rGi~iiYr@F}BREMf:\R!f!i>N~ES;fJ~jmP,RESS13R~NEiSYS:11E~ Well 15 205 Well 18 375 Weill\! 240 PS3 200 3,640 w/fire flow W256 W440 W580 :W06 com let ion W650 IE240 1E398 !E490 Lafayette Cook Road Hawthorne Qiuarry W517 Port W256 via PS 4 PS 17 W256 via PS281 W440 via PS 8 W256 via b'f8lvity Well 14 E398/E240 intertie Well 9 Well ]3 Well 21 E240 via PS ] I PS 14 PS 16 E398 via PS ] 2 PS ] 3 W256 via Booster Station 3' W256 via Boosler Station 7 W256 via Booster Station 6 W517via Booster Station] 0 ],500 1,500 4,000 1.750 180 600 270 510 IAOO 600 1.250 950 1,000 300 17 MG Reservoirs 4, 5, and 21 2.7 MG Reservoirs 6 and 8 OA5 MG (Port Orchard) I.OMG Reservoir 23 4.58 MG Reservoirs 11,16, and 19 4.8 MG Reservoirs 12,13,17, and 20 2.0 MG Reservoirs 15 and 18 None 60 None 3 MGD (incl. PSNS) 0.9 MGD TBD 0.02 MGD 1.5 MGD 1.2 MGD 0.7 MGD Est. 15,000 gal/day Est. 2,000 gal/day Est. 2,200 gal/day Est. 2,000 gal/day 0.05 MGD winter 0.55 MGD summer Est. 25,000 Gal/day Downlown and Kitsap Way businesses PSNS HMGD) A few industrial facilities Residential None Wheaton Way businesses Harrison Hospital 0.1 MGD Wheaton Way businesses Mainly residential Residential only Residential only Residential only Residential only Golf Course Industrial Park Airport Commercialon]y Multiple sources Interties with 2 other zones 2 pump stations Inlertie with W650 Zone Intertie with Port Orchard Large amounl of storage for low ADD Intertie with 2 zones Multiple pump stations. ADD for zone can be met with the 3 wells. Can also use E240 Zone, and Reservoir] 9 can be valved to just serve the hospital. 2 pump stations N/A N/A N/A N/A Can be supplied surface water if necessary. Golf course has irrigation ponds. Diesel back-up pump Full Res. 22 can supply CI, water about a week. Zone supplicd by b'favily as long as surl"ce supply is operational and water quality requirements met. 20 kW generator for analyzers. Transfer switches at Wells 18/20 and screen building. Storage alone about 2 days. About 2 days of storage, Would need a portable generator in an extended power outnge. Transfer switch at PS 17 and PS 4. PS 281 has a m8nu81 transfer switch. About 20 days of slorage with reservoir kept at half full to maintain both chlorine residual and fire storage. Transfer switch at PS8. As long as surface supply availab]e, this zone would not be out of water. Storage alonc would last about 4 days. Transfer switch installed 811 Well 14. A 150 kW portable generator is kept 811 Well 14 and sized 10 be used at any facility in thc east side. Transfer switch for this generator installed at multiple facilities and at PS 16/Well 13 and PS 11 in this zone. About 4 day's storage. About 3 day's storage. Transfer switch installed at PS 12. This small zone can gel water fromlhe W256 zone bul would have pressurc about 20 psi. This small zone can get water from the W256 zone but would have pressure about 20 psi. This small zone can get water fromlhe W256 zone but would have pressure about 20 psi. This small zone can get water from the W256 zone but would have pressure about 30 psi. 60 None During emergencies, the golf course could only use water from on-site ponds. Potable storage alone would last about 2 weeks. Transfer switch installed at Wells 18/20. During power outages, ] ,500 gpm diesel lire pump activalcs. Trnnsfcr switch also allows the use of the portable generator. Notcs: Surface supply fiml yield is 2,020 MGY. TM capacity is 18 MGD. "Days of storage" assumes sources unavailable and ADD. In an emergency there would be water restrictions, b'favity surface supply, and limited pumping via the generator. 5-2 Transmission and Distribution System 120 None 1.2 MG Reservoirs ION and 10S None 2005 Bremerton Water System Plan 5.3 Control Valves The Bremerton Main System has 25 pressure-regulating valves and the Bremerton West 517 Zone System has four. These valves are detailed in Table 5-2 and include installations for reducing pressure, pressure relief, and pressure zone intertie. Pressure reducing stations allow water to flow from higher pressure zones to lower pressure zones without over-pressurizing the lower zone. Pressure relief valves prevent over-pressurization by relieving excess pressure to a lower pressure zone or to the atmosphere. A number of the valves are an integral part of the day-to-day operation of the system and provide water to lower elevations at acceptable pressures. Several pressure reducing stations operate only in an emergency capacity, providing water to the lower zones when the pressure downstream drops below preset levels during very high demands. This condition would only occur during a system failure, a large fire demand, or some other uncommon event. The Water Utility currently includes two zone interties that allow water to flow from higher pressure zones to lower pressure zones. 5.4 Interties with Other Water Systems The Utility has interties with five other water systems, as indicated previously in Table 3-8 and 5- 2. Most of these interties provide water from Bremerton to neighboring water districts. Water in the West 580 Zone is mixed with water from the Port Orchard system. The North Perry intertie could provide water to Bremerton, although it has never been used for this purpose. It is meant to provide an emergency intertie with the North Perry Avenue Water District. One intertie is used to provide surplus water to the City of Port Orchard. A system intertie exists between the Bremerton Main System and the Bremerton West 517 Zone System at Pump Station 3. Water can either be pumped from the surface water transmission main to the West 517 Zone (as long as Surface Water Treatment Rule requirements are met) or water can be gravity fed from the West 517 Zone to the West 256 Zone transmission main. Transmission and Distribution System 5-3 2005 Bremerton Water System Plan Table 5-2 Bremerton Main System Control Valves 2" 70/74 psi V9 Werner Road at the church Reduces pressure within the West 650 Zone 6" Nonnally Open 1.5" 34 psi VIO Union A venue and Poindexter West 440 Zone to West 256 Zone 6" Nonnall Oen 2" 55/59 psi VII Werner Road at UPS West 650 Zone 6" Normall en Fairgrounds Road and 6" 53 psi V12 East 398 Zone to East 240 Zone Trac on Blvd. 2" Normall Closed Riddell Road and 3" 32 psi VI3 East 490 Zone to East 240 Zone Benita Place NE 6" Normall Closed 2" 71 psi VI4 Pine Road and The Woods Reduces pressure within the East 398 Zone 6" Normall en 1.5" 69 psi VI6 Tibardis Court and Cortez Drive East 398 Zone to East 240 Zone 8" Normall en 2" 65 psi VI8 Price Road and Francis Street West 440 Zone to West 256 Zone 4" Normall en 2.5" 50 psi VI9 Northlake Way and W. Lake Drive West 440 Zone to West 256 Zone 6" Normall en 2" 45 psi V21 Sunn Fjord Building I Pressure regulating within the West 440 Zone 6" Normall en Sunn Fjord and 3,d Street 2.5" 65 psi V22 Reduces pressure within the West 440 Normally Open 8" 4" 52 psi V31 4132 First Street Reduces pressure within the West 440 Zone 10" Nonnall en 2" 50 psi V38 Holland Road NW East 398/East 240 6" Normall Closed 2" V39 500 Union Ave and Werner Road Reduces pressure within the West 440 Zone V21 Sunn Fjord Building I 1.5" From West 440 Zone to atmosphere Normally Closed V27 21st Street and Cambrian Avenue '2" ,Prevents excess pressure in the Lafayette 40 psi boosted West 256 Normall Oen V28 National Avenue & Kitsap Way 3" Relieves excess West 440 pressure to the Normally Closed West 256 V34 Kent A venue and Evans A venue 2" West 440 to atmosphere Normally Closed V36 NE Woods Place 2" East 398 to atmosphere Normally Closed V37 Pump Station 17 6" Function unknown - valve olT Normally Closed V43 Pump Station 2 4" West 256 Surge Anticipator V52 Pump Station 8 4" West 650 Surge Anticipator V54 Pump Station 4 4" West 440 Surge Anticipator V55 Pump Station 2A 4" Wesi580Zone Surge AJlticipator Transmission and Distribution System 5-4 2005 Bremerton Water System Plan Table 5-2 (continued) NA Price Road West 440 Zone to West 256 Normally Open # Location Size Function Setting V47 Pump Station 3 4" Pump Control Valve from Normally Closed West 256 to West 517 Pacific and First 12" PSNS Farragut and Montgomery 12" Flows from West 256 Normally Open First and Rainier 12" Jackson Austin Drive 12" Park Naval Flows from West 256 Normally Open Shorewood Drive 8" Housing City of Port Anderson Hill Road 18" Pumps from West 256 Normally Closed Orchard City of Port Old Clifton Road 16" From W256 Normally Open Orchard (to be installed in 2006) VI5 Marwood Drive 4" East 398 to North Perry Water District Normally Closed Emergencv Onlv Bremerton Main System Intertie Valve with Separate Water Systems Note: No single valves separate the City's system from Rocky Point. Bremerton West 517 Zone Valves Location # Location Size Function Settin2 NA Pump Station 3 4" System/Zone Intertie Normally Closed West 517 Zone to West 256 Relief V32 Barney White Road & Constance 4" West 517 Zone relief to atmosphere Normally Closed IS' V35 Imperial Way - Bremerton Industrial Park 3" Regulating within the 46 psi West 517 Zone Normally Open 8" V50 5785 Imperial Way 6" Regulating 65 psi 4" BS 1 0 to Airport Normally Open V53 5785 Imperial Way 8" Relief/Recirculation Normally Closed West 517 Zone to Reservoir 10 N Transmission and Distribution System 5-5 2005 Bremerton Water System Plan 5.5 Pump Stations One booster station and five water pump stations are located in the East Bremerton distribution system. Pump Stations 11, 14, and 16 draw water from the East 240 Zone and raise it to the East 398 Zone, filling Reservoirs 12, 13, 17, and 20. Pump stations 12 and 13 in the East 398 Zone provide water to Reservoirs 15 and 18 in the East 490 Zone. Booster Station 5 is an in-line booster that draws water across the Port Washington Narrows from the West 256 Zone into the East Zone 240. Five water pump stations and five booster stations are located in the West Bremerton distribution system. Pump Station 2, located at Anderson Creek, is the largest active station in the system and provides water to the West 256 Zone from the Anderson Creek wellfield. The Anderson Creek wells pump at a constant rate to the pump station aeration basin. The well water is chlorinated and pumped as needed into the system. Variable frequency drives allow control of the pump station to prevent discharge of groundwater into Anderson Creek. Pump Stations 4 and 17 draw water from the West 256 Zone to supply the West 440 Zone by maintaining the level in Reservoirs 6 and 8. Pump Station 8 supplies water to the West 650 Zone and Reservoir 23. Booster Stations 3, 6, 7, and 9 provide water as necessary at an acceptable pressure to the closed zones. The pump stations are described in Table 5-3. The West 256 Zone System includes the Pump Station 3 intertie pump station and Booster Station 10, which provides fire flow and pressure to the Airport and Industrial Park at the Port of Bremerton. Pump Station 2a is currently under construction to be completed in 2006 and will provide water from the West 256 Zone to the West 580 Zone and the Port Orchard McCormick water system and Port Orchard's 0.45 MG reservoir. Transmission and Distribution System 5-6 Table 5-3 City of Bremerton Main System Pump Stations Pump Station Description Capacity Function Comments HistOlic pump station located at 4230 W. Five pumps: Not used regularly since 1956. Maintained PS I Emergency suIiace supply potential for emergencies - last used in 1985 drought. Gorst Creek Old Belfair Highway constlUcted in 1936. 50 to 250 hp Regular use would require more treatment. Replaced previous pump station at same 4,000 gpm total Pump station collects water li'om up to six PS 2 site. ConstlUcted in 1985 at 2380 Four pumps: Transfers water fi'OIn the Anderson Creek wells and pumps into system. Pumps have Anderson Creek Anderson Hill Road SW, Upgraded in 2 - 650 gpm wellfield into the West 256 Zone, VFDs, 2006. 2 -1,350 gpm Pump station located at 1335 Jones in the 1,500 gpm total Draws water fi'Om the West 256 Zone and PS 4 Two pumps: tran sfers it to the West 440 Zone to Used in conjunction with Pump Station 17. West 256 Zone. 750 gpm each Reservoirs 6 and 8. PS 8 Pump station located in the West 440 1,750 gpm total Pumps trom the West 440 Zone; transfers it Pump station and reservoir placed on line in Zone at 7300 Wel11er Road adjacent to Two pumps: to the West 650 Zone, Reservoir 23. 2004. Reservoir 8. 900 gpm each East 240 Zone pump station located at 844 . 1,400 gpm total Transfers from Reservoir II Located on the same site as Reservoir II. PS II Two pumps: water to Occasionally PS II has to be tumed olT duc Callahan Olive. 700 gpm each Reservoirs 12 and 13 in the East 398 Zone. to low reservoir levels. 950 gpm total PS 12 East 398 Zone pump station located at Two pumps: Transfers water trom Reservoir 12 to Located on the same site as Reservoir 12. 3021 Olympus Olive. I - 500 gpm Reservoirs 15 and 18 in the East 490 Zone. I - 450 gpm 1,000 gpm total PS 13 East 398 Zone pump station located at Two pumps: Transfers water li'Dln Reservoir 13 to Located adjacent to Reservoir 13 and works 2929 Olympus Olive. I - 250 gpm Reservoirs 15 and 18 in the East 490 Zone. in conjunction with Pump Station 12. 1-750gpm PS !4 East 240 Zone pump station located at One Pump: Transfers water from the East 240 Zone to Works in conjunction with Pump Station II. 2! 0 I Schley Way, 600 gpm Reservoirs 12 and 13 in the East 398 Zone. 1,250 gpm total Transfers water trom the East 240 Zone and East 240 Zone pump station located at 50 Three pumps: Well 14 to Reservoirs 17 and 20 in the East Works in conjunction with Wells 9 and 13 to PS 16 NE Vena Avenue. 2 - 525 gpm 398 Zone. sustain level in Reservoirs 17 and 20. I - 200 gpm West 256 Zone pump station located at 1,500 gpm total Transfers. water fi'om the West 256 Zone to Completed July 1991; source is primarily PS PS 17 4398 W. Old Belfair Highway near the Three pumps: 500 the West440 Zone. Site of CT Monitoling Forestry Operations Center. gpm each Station .3 2 when that pump station is running. PS-2A (future) West 580 Pump Station to be located on Projected: Transfers water fi'om the West 256 Zone to Scheduled for installation in 2006. Anderson Hill Rd in 2006. 1,800 Iwm future West 580 Zone Reservoir. Booster Station 3 West 256 Zone located at 3000 17th Street One pump: Increases pressure to the Lafayette closed Serves approx. 69 residences; spare pump on and Latayette. 300 gpm zone at approx. elevation 350. hand. Booster Station 5 East 240 Zone at 589 Lebo Blvd. One pump: Ol-aws water across the NalTOWS from the Generally not in use; can help maintain level I ,000 gpm West 256 Zone to the East 240 Zone. in Reservoirs II, 16, and 19. Booster Station 6 West 256 Zone located at 4490 Two pumps: Increases pressure to Hawthol11e and W. Serves apPlDximately 9 residences. Hawthol11e Avenue W 42 gpm each Summit Avenue in Gorst. Booster Station 7 West 256 Zone located at 1527 Cook Two pumps: Increases pressure to Cook and Shawn Serves 9 residences. Road sw. 53 gpm each Roads in Gorst. Booster Station 9 West 256 Zone located at 2704 Quany One pump: Increases pressure to Quany St. Serves 13 residences. Street. 84 gpm Transmission and Distribution System 5-7 Pump Station Description Capacity Function Comments Draws water from the surface Pumps water to the Gold Mountain Golf Pump station located at 7061 W. Old One Pump: supply and Wells 17 and 20 and Course and Reservoir 10. Emergency use PS 3 Belfair Highway in West 256 Zone. 200 gpm pumps to the West 517 Zone. onlv. Site ofCT MonitOling Station 2. Four Pumps: 2 - 1,500 gpm tire pumps This booster station is used to increase West 517 Zone fire and booster I - 500 gpm pump Maintains adequate system pressure and provide tire flow protection to Booster Station 10 station located at 5785 hnpelial Way 1 - 200 gpm pump pressure and provides tor fire the POll of Bremellon industlial park adjacent to Reservoir 10. Domestic: 700 gpm tlow. acquired by the Utility in July 1999. Fire tlow: 1,500 gpm Backup tiretlow: 1,500 gpm . Table 5-3 Continued West 517 System Pump Stations 5-8 Transmission and Distribution System 5.6 Transmission and Distribution Piping The City of Bremerton has an extensive network of transmission and distribution piping ranging in size up to 36 inches in diameter. Pipe inventory consists of approximately 291 miles of pipe in the Bremerton Main System and 11 miles of pipe in the West 517 Zone System with the majority being 6- and 8-inch diameter distribution piping. A summary of the quantity of pipe by diameter is provided in Table 5-4. 5.6.1 Transmission Piping Transmission main piping is used to move large quantities of water from one area of the system to another, generally without service connections, and includes the pipe bringing water from the McKenna Falls Intake Facility and the three pipes crossing the Port Washington Narrows. The transmission pipe supplying water from the McKenna Falls Intake Facility ranges in size from 24 inches to 36 inches in diameter. The pipeline is approximately six miles long and supplies water to the 11 MG System Control Reservoir 4. Flow in the transmission pipe is controlled by a motor-operated oscillating butterfly valve adjacent to the Twin Lakes area. The control valve at Casad Dam controls flow down the streambed to the pipe intake at the McKenna Falls Intake Facility. Both of these valves can be remotely controlled at the Utility's Olympus facility. Two transmission mains supported on bridges cross the Port Washington Narrows and provide water to East Bremerton. A 12-inch water main is supported from the Manette Bridge, and a 20-inch water main is supported on the Warren Avenue Bridge. A third 18- inch diameter submarine line crosses from Snyder Avenue to Lebo Boulevard. These pipelines transfer water from the West 256 Zone to the East 240 Zone. In 1998, the City of Bremerton completed a new 36-inch diameter transmission main between Gorst and Reservoir 4. This main replaced a 40-year-old, 24-inch diameter cast iron main, increased system capacity, and increased chlorine contact times within the pipe. During this project, the City also constructed an 18-inch diameter transmission main in Sherman Heights Road linking the 24-inch Sherman Heights transmission main and an I8-inch transmission main in State Route 3. The 36-inch transmission main conveys water from McKenna Falls, while the Sherman Heights main conveys groundwater from the Anderson Creek wellfield. The 36-inch main and the Sherman Heights main are interconnected and valved at Gorst to provide better separation of surface water and groundwater supplies and redundant transmission pathways from both the McKenna Falls and the Anderson Creek wellfields. This is the first phase of the City's plan to upgrade its primary surface water transmission system, as the 28-inch diameter steel is nearing the end of its service life. The second and third phases, included in the City's Capital Improvement Plan for 2006-2025, will replace the transmission main all the way to the McKenna Falls Intake Facility with 36-inch ductile iron pipe. Transmission and Distribution System 5-9 2005 Bremerton Water System Plan 5.6.2 Distribution Piping The distribution system is a grid of 4- to 12-inch mains comprised of pve, cast iron, ductile iron, steel, galvanized steel, and asbestos cement. Ductile and cast iron pipe make up the majority of the system. Flow within the system is generally from west to east. The system has 1,610 fire hydrants and 5,726 valves throughout to provide Utility customers with fire protection. Bremerton has a program to replace substandard mains (defined as <3 inches). Replacement is prioritized based on head loss, age of pipe, size, maintenance problems, and customer complaints. Approximately $300,000 is budgeted each year to address substandard main replacement. Planned projects to address larger main projects are listed in the appendix as "Distribution Improvements" and are budgeted separately from the substandard mains. Cast Iron Ductile AC Galvanized Steel PVC Concrete Copper lfnknown Totals Iron 1" and . . smaller 0 0 0 3,700 0 1,248 0 740 331 6,019 2" - 1" 6,492 58 0 37,513 0 15,910 0 565 1 ,734 62,272 3" 7,474 284 0 124 0 2,211 0 0 46 10,139 4" 76,305 40,435 11,672 0 3,019 772 0 0 0 132,203 6" 243,336 122,491 54,606 0 0 867 0 0 0 421,300 8" 235,331 236,970 45,846 0 1,350 501 0 0 0 519,998 10" 19,307 19,240 4,729 0 0 0 0 0 0 43,276 12" 80,770 90,586 12,925 0 1,567 69 0 0 0 185,917 16" 15,927 8,393 0 0 0 0 0 0 0 24,320 18" 0 51,870 0 0 0 0 0 0 0 51,870 20" 1,212 0 0 0 1,061 0 0 0 0 2,273 24" 9,934 15,499 0 0 12,927 0 0 0 0 38,360 27" 0 0 0 0 0 0 4,756 0 0 4,756 28" 0 0 0 0 12,378 0 0 0 0 12,378 30" 0 2,527 0 0 0 0 0 0 0 2,527 36" 0 17,344 0 0 0 0 0 0 0 17,344 Total 696,088 605,697 129,778 41,337 32,302 21,578 4,756 1,305 2, III 1,534,9 52 %of 45.3% 39.5% 8.5% 2.7% 2.1% 1.4% 0.3% 0.1% 0.1% 100.0% System Table 5-4 City of Bremerton Main System Pipe Inventory Linear Feet Water System Description 5-10 2005 Bremerton Water System Plan City of Bremerton West 517 Zone System Pipe Inventory Linear Feet AC Ductile Iron PVC Galvanized Cast Iron Total 1" and smaller 0 0 67 0 0 67 2"-1" 0 1,000 1 ,631 1,152 0 3,783 4" 239 2,077 0 0 65 2,316 6" 1,159 3,421 0 0 146 4,580 8" 20,412 10,924 0 0 85 31,336 10" 3,536 0 0 0 0 3,536 12" 10,679 2,846 0 0 39 13,525 16" 0 658 0 0 0 658 Total 36,025 20,926 1,698 1,152 335 59,801 % of System 60.2% 35.0% 2.8% 1.9% 0.6% 100% 5.7 Storage The 16 treated water storage reservoirs are detailed in Table 5-5. Types of construction include steel and concrete, ground level, buried, and elevated reservoirs. The reservoirs provide peak demand storage, emergency reserve, and hydraulic gradient control for the system. Interior and exterior protective coatings are inspected regularly and re-applied when needed. The Bremerton Main System contains a total o{32 MG of storage capacity, and the West 517 Zone System contains a total of 1.21 MG of storage capacity. Water System Description 5-11 Reservoir Name Description Table 5-5 City of Bremerton Main System Summary of Water Storage Volume MG Overflow Elevation ASL Water Source Comments Union River Resel"Voir Twin Lakes Reservoir 22 4 6 8 II 12 Union River Resel"Voir behind Casad Dam; 130- foot high concrete dam arch constructed in 1956. Located by the transmission main from McKenna Falls. Does not supply water into the system but rovides rechar e to the Twin Lakes A uifer. Located on 5000 Road; ground level steel tank used to supply water to McKenna Falls Intake Facilit forchlorine injection and screenin . Below ground concrete reservoir constructed in 1921. Located at 480 I Roosevelt Blvd. in West Bremelton. Two concrete above-ground tanks constructed in 1954 and located in Forest Ridge Park at 3200 First Streetin West BremClton. Elevated steel storage resel"Voir constructed in 1960 located at 5144 Francis Street in West Bremelton: Ground-level steel tank constructed In 1973. Located at 7300 Wemer Road in West Bremelton. Below-ground concrete tank constructed in 1942. Located nOlth of Pump Station II at 844 Callahan in East Bremelton. Below-ground concrete tank constructed in 1947. Located at 3029 Olympus Olive in East Bremelton. 1,400 64 1.7 5 Union River Main sUltace watCl. source for the City impounds watCl. fi.om thc City-owned and maintained watCl"Shed. WatCl. fi.OIn McKenna Falls is divelted into Twin Lakes dUling high runotTperiods. Also refelTed to as the "Head Tank" and is in screen building. Seismic Main control reservoir for the McKenna Falls system. Floating cover replaced and seismic valve installed in 2002. Su lies the West 256 Zone. Provides storage tor the West 256 Zone. Exterior recoated in 1999. Small resel"Voir works in conjunction with Resel"Voir 8 to provide storage in Wcst 440 Zone. ExtClior recoated in 1998. Top 6-8' unusable due to elevation ditTerenee between Resel"Voir 6 and 8. Ground-level resel"Voir in the West 440 Zone. Height increased 40' in 1982. ExtCl-ior reeoated in 1996, intClior in 2005. Seismic u !rade in 2005. Provides storage to East 240 Zone and water to Pump Station II. Top once used as a basketball COUlt is not cUlTentl maintained for this JU1 ose. Provides storage to the East 398 Zone and supplies water to Pump Station 12. Water System Description 5-12 202 265 McKenna Falls Intake 0.20 566.3 McKenna Falls Intake 11.0 Overflow - 48' McKenna Falls Intake, Pump Station 2 and Wells 17 and 20 255.9 3.0 Dia.IOI'5" Overflow - 25' 241.9 West 256 Zone 0.150 Dia.32' Height 130' Overflow - 27.9' 2.54 81' Dia. Ovcrtlow - 66' 1.58 Depth - 15' Area = 14,080 ft2 2.0 Depth - 15' Area = 27,900 ft2 447.3 West 256 Zone Pump Stations 4 and 17 441.0 West 256 Zone Pump Stations 4 and 17 239.8 Floats on East 240 Zone and supplied by West 256 Zone 397.0 East 240 Zone Pump Stations II and 14 Overflow Reservo i ,. Water Source Comments Description Volume (MG) Elevation Name ASL 0.76 Provides storage to East 398 Zone. Works in 13 Below-ground concrete tank constructed in ] 941. Depth = 13' 398.0 East 240 Zone Pump conjunction with Reservoir 12. Topsoil and grass Located at 2929 Olympus Olive in East Bremel10n. Stations I ] and] 4 Dia. = ] 00' covered tank; no extetior eXDosed. Ground-Ieve] steel tank constlucted in 1965. 1.0 Provides storage to the East 490 Zone. Works in 15 Located at ] 925 NE Chetyl in East Bremet10n. Dia. = 8]' 489.5 East 398 Zone Pump tandetn with Reservoir 18. Exterior recoated in Stations 12 and 13 Reservoir] 8 also located on this site. Overflow = 26' 1997, intClior in 2004. 1.0 Ground-level steel tank constructed in 1976. F]oats on East 240 Dia. - 95' Provides storage to the East 240 Zone. Extet'ior 16 Located in the Tracyton Watet'Shed at 260 238.9 Zone and supplied by Overflow - recoated in 1997. Sugarpine Dlive in East BremeJ10n. West 256 Zone 18.5' Gi'ound-Ievel 1.0 steel tank constructed III 1977. East 240 Zone Pump Provides storage within the East 398 Zonc. Works Dia. - 95' ] 7 Located at 400 Ridge Lane in East Bremet10n. 398.] Station 16 and Wells 9 in tandetn with Reservoir 20. Intet'ior and cxtcrior Overflow - 18' Reservoir 20 also located on this site. and 13 recoated in 1995. Ground-level steel tank constructed in 1978. 1.0 Provides storage within the East 490 Zone in 18 Located at 1925 Chetyl Street NE East Dia. - 81' 489.4 East 398 Zone Pump tandetn with Reservoir 15. ExtClior recoated in III Stations 12 and 13 Bremel10n. Reservoir 15 also located on this site. Ovedlow - 26' 1997. 2.0 Floats on East 240 Provides storage within the East 240 Zone. Ground-level steel tank constructed III 1979. 19 Dia. - 97' 239.1 Zone and supplied by Extetior recoated in 1997. Seismic upgrade in Located at 2628 Ash Street in East Bremel10n. Overflow - 35' West 256 Zone 2004. 1.0 Ground-level steel tank constructed III ]981. East 240 Zone Pump Provides storage to the East 398 Zone. Works in Dia. - 95' 20 Located at 400 Ridge Lane in East Bremet10n. 398.1 ' Station 16 and Wells 9 tandCln with Reservoir 17. ExteJior recoated in Overflow - 18' Reservoir 17 also located on this site. and 13 1995. 3.0 Ground-Ieve] steel tank constructed III 1983. Provides storage to West 256 Zone and Jackson Dia. - 95' Floats on and supplied 21 Located in NAD Park at 2 132 LakehUl'St Olive in 255.4' Park. Extetior recoated in 1996. Seismic upgrade Overflow - by West 256 Zone West Bremel10n. in 2005. 59.5' 1.0 Ground-]evel steel tank constructed in 2003. Dia. - 75' West 440 Zone Pump While demands arc low in the West 650 Zone, this 23 652.3' Reservoir 23 is kept half !low to maintain chlorinc Located on Utility Road # I 000 in West Bremel10n. Ovedlow - Station 8 residual. 31.5' Table 5-5 Continued City of Bremerton Main System Summary of Water Storage Water System Description 5-13 Overflow Reservo i r Water Source Description Volume (MG) Elevation Commcnts Name ASL 1.21 Two ground-level steel tanks constlUcted in 1967. Overflow - West 517 Zone Wells Provides storage to the West 517 Zone indusl1ial 10 Located in the Industlial Park at 5785 hnpetial 39.5' 517.4 15, 18, and 19 and park area and the golf course. Recoated in 1997. I-MG tank transt'e1Ted to BrClllclton in 1999. Way. Dia. 10 N 66' Pump Station 3 10 S 30' Seismic upgrade in 2005. Table 5-5 Continued Bremerton West 517 Zone Water Storage 5-14 Water System Description 2005 Bremerton Water System Plan Section 6 Operations Program 6.1 Water Utility Organization 6.1.1 Responsibilities Both the City of Bremerton Main and West 517 Zone Systems are operated by the Bremerton Water Utility as part of the City of Bremerton Department of Public Works and Utilities. The Department's organizational chart is shown in Figure 6-1. Within this organization the responsibilities for operating the Water Utility are as follows: . The Director of Public Works and Utilities is the Department head for Public Works and Utilities and reports to the Mayor. . The City Engineer manages the development and implementation of the Capital Improvement Program (Crp) for the City's water, wastewater, storm water, and transportation systems. This position is responsible for engineering aspects of the water system operation in coordination with Water Resources and field personnel, develops and maintains the water system hydraulic model, reviews and approves new connections and developer extensions of the water system, and supervises engineering personnel. The City Engineer reports to the Public Works and Utilities Director. . The Water Resources Manager manages water supply and treatment operations which includes compliance with SDW A, Dam Safety, and Risk Management Program (RMP) regulations; the watershed control, biosolids monitoring, dam safety, conservation, and wellhead protection programs; water quality monitoring; corrosion control (lead and copper); data management and regulatory reporting; reservoir management; water conservation and customer education; water rights; and water system planning. This position supervises the Water Resources Operations Supervisor, Environmental Technicians, and Water Resources Assistant and reports to the Public Works and Utilities Director. . The Utility Operations Manager manages field operations and personnel involved in installing, testing, reading, repair and maintenance of water mains, meters, hydrants and valves; inspecting and testing of cross connection control systems; implementing service connections and disconnections; responding to customer service complaints; maintaining records on field service activity, transmitting field data and information to appropriate operations staff, and implementing repair schedules and projects for water equipment and systems, flow and pressure testing; locating underground facilities; and managing utility inventory and general facilities. This. position supervises the Distribution Supervisor and Cross Connection Specialist and reports to the Public Works and Utilities Director. . The Forestry Manager manages 8,200 acres of utility-owned forest lands, including the Union River Watershed; controls access and provide watershed patrols; manage forestry, timber harvest, and biosolids operations. This position supervises the Forestry Operations Program 6-1 2005 Bremerton Water System Plan Supervisor and reports to the Public Works and Utilities Director. · The Water Resources Operations Supervisor monitors and controls daily water system operations and maintenance for water supplies, chlorination, corrosion control treatment, reservoirs, and pump stations; schedules work activities; coordinates related project management; prepares SWTR and Dam Safety compliance reporting; supervises the Lead Water Operator, Senior Water Operators, and Operators; reports to the Water Resources Manager. · The Distribution Supervisor supervises the meter crew and maintenance and construction crew; coordinates and assigns the work of crews engaged in the installation, maintenance and repair of the water system including waterlines, valves, hydrants, meters and other facilities; coordinates testing, flushing, and sampling of new water mains, connections to existing mains, and installation and operation of hydrants and related facilities; supervises Service Specialists and Customer Response personnel; and reports to the Utility Operations Manager. · The Cross Connection Control Specialist implements the City's Cross Connection Control Program and reports to the Utility Operations Manager. · The Utility Billing Supervisor handles billing for the water, wastewater, and storm water utility funds and reports to the Administrative Manager. Operations Program 6-2 2005 Bremerton Water System Plan CITY OF BREMERTON DEPARTMENT OF PUBLIC WORKS AND UTILITIES PW&U Funds Involved Ilelude: 001 General FundlGeneral Facilities lDept 49) 001 General FundlEnglneerlng (Dept 61) 401 Water' 451 Wastewater 481 Stormwater' 510 ERR IDepl371 101 Arterial Streets (Dept 41) 102 Streets (Depf42} . Covers Depts 31,32,34,35,37,38, & 39 Figure 6-1 6-3 Operations Program 2005 Bremerton Water System Plan 6.1.2 Certifications Regulations require certain Water UtilIty employees to have state water certifications based on water system size and complexity. For Bremerton, these requirements are: · Managers responsible for supply/treatment and for the distribution system must each have a Water Distribution Manager 4 certification. · Supervisors in charge of shift operations for supply/treatment and for the distribution system must each have at minimum a Water Distribution Manager 3 certification. · The water treatment operations supervisor must have at minimum a Water Treatment Plant Operator 2 certification. · All water treatment plant operators authorized to make treatment changes must have at minimum a Water Treatment Plant Operator 1 certification. · Any employee who provides analyses used for regulatory purposes (such as chlorine residual and pH) must be "qualified," which according to state regulation, is a person certified in the state as a Water Distribution Manager or Water Treatment Plant Operator. City of Bremerton Water Utility managers and supervisors have the certifications shown in Table 6-1. Years with Job Title Certification Education City Director Public Works and None required Master's Degree 2 Utilities City Engineer Washington State BS in Civil Engineering 4 Professional Engineer Water Distribution Manager 4 Master of Public Health Water Resources Manager 14 Cross Connection Control Specialist Water Distribution Mgr4 Waterworks Courses Utility Operations Manager Cross Connection Control Specialist Journeyman Plumber 32 Backflow Assembly Tester Water Resources Operations Water Distribution Manager 4 Associate's Degree 25 Supervisor Water Treatment Plant Operator 2 Waterworks Courses Distribution Supervisor Water Distribution Manager 3 Waterworks Courses 15 Billing Supervisor Water Distribution Manager 3 BS in Business 31 Table 6-1 Water Utility Management and Supervisory Personnel Water Certifications as of December 2005 In addition to the personnel listed above, other Water Utility personnel have vanous levels of certihcaiion in water distribution and cross connection coniroL .AIl Water Utility personnel are encouraged to attend training sessions and gain professional certification. Operations Program 6-4 2005 Bremerton Water System Plan 6.2 System Operation and Control 6.2.1 Components Details on water supplies and transmission and distribution are provided in Sections 3 and 5. Water system component relationships are illustrated in Figures 1-2 and 1-3. 6.2.2 Normal and Alternative Operation Water operations and maintenance are located in two facilities as described below: 3027 Olympus Drive 100 Oyster Bay Road Water resources supply and treatment operation Water distribution maintenance Customer billing Water distribution construction Engineering Meter reading and maintenance Environmental monitoring Customer response and dispatch Administration Cross connection control Fleet maintenance Electronics and communications Inventory control and warehouse Under normal operation, system data are received and recorded at the Olympus Drive Water Operations Center via a computerized SCADA system. Alternative operation typically includes both remote automatic and manual or "hand" operation. In the event of SCADA failure, facilities can be operated by local hand operation. Operations and maintenance procedures specifY normal, alternate, and emergency procedures for operation of supply pumps, booster pumps, disinfection facilities, reservoirs, valves, and SCADA systems and also contain preventative maintenance and emergency response plans. 6.2.3 Surface Supply Operations at the McKenna Falls Intake Facility The McKenna Falls Intake Facility provides redundant disinfection facilities and automated and remote control of the Union River source of supply based upon system demands, influent source turbidity, and chlorine residual. The dam outlet valve controls Union River Reservoir releases. The transmission main Twin Lakes control valve controls flows from McKenna Falls to Reservoir 4. Operations personnel determine daily how much surface supply is available after downstream flow requirements are met. After requirements for the distribution system are determined to maintain adequate pressure and storage, appropriate adjustments are made to provide flow to the distribution system, store water in the Union River Reservoir, or divert excess water to Twin Lakes. Turbidity of the Main Stem, West Branch of the Union River, and the system intake is continuously monitored. During high turbidity events, the source of high turbidity is excluded from entry into the transmission system. High turbidity will also trigger a remote alarm at the Water Operations Center, which results in an automatic shutdown of water into the transmission main if the intake turbidity stays above a predetermined level for a set period of time. Operations Program 6-5 2005 Bremerton Water System Plan The disinfection system provides redundant disinfection and automatic system shutdown and standby power. A flow-paced chlorination system is used to maintain the desired chlorine residual. If the residual drops below a preset value for a set period of time, the control valve at Twin Lakes will close, excluding the water from the transmission system. A remote alarm is then sent to the Operations Center. A generator supplies automatic standby power to motorized gates, valves, chlorinators, water quality analyzers, and telemetry systems. 6.2.4 Groundwater Supply Wells Groundwater supply wells are disinfected (with the exception of Well 19) and are typically used to supplement the McKenna Falls surface water supply as described below: · All Anderson Creek Wells (lR, 2R, 3, 6R, 7, and 8) pump to the aeration basin at Pump Station 2 where their supply is disinfected with chlorine. · Manette Wells 9, 13, 14, and 21 are generally located along South Central Valley Road in East Bremerton. These wells have the following methods of operation: Well 9 can be automatically controlled by the level of Reservoirs 17 and 20. It is generally operated in Hand Mode because of sand production on start up. Well 13 is automatically controlled by the level of Reservoirs 17 and 20. During winter months it typically would be set to follow Pump Station 16. - Well 14 can be automatically controlled by the level of Reservoir 16. It is usually run in Hand Mode to optimize production to the East 240 Zone. · Gorst Area Wells, Wells 15, 17, 18, 19, and 20 are located in the Twin Lakes and Gold Mountain Golf Course area of West Bremerton. All wells have the following operational characteristics: - Wells 15, 18, and 19 are automatically controlled by the level in Reservoir 10 serving the West 517 Zone. Wells 17 and 20 are automatically controlled based on Reservoir 4 level or Hand Mode operation and pumped into the McKenna Falls transmission main. 6.2.5 Storage Reservoirs The Bremerton Main System contains 16 finished water storage reservoirs throughout the distribution system that are detailed in Section 5, Eight of the reservoirs are located in West Bremerton, and nine are located in East Bremerton. Two additional reservoirs are located in the West 517 Zone system. Remote level indications and alarms are transmitted to the Water Operations Center on Olympus Drive. All reservoirs have telemetry providing infoTInation on levels, signaling operation to appropriate pump stations, and sending high, low, power outage, and communication failure alarms. Reservoir information is detailed in Section 5.7. Operations Program 6-6 2005 Bremerton Water System Plan 6.2.6 Pump Stations Pump station modes of operation are summarized in Section 5. 6.2.7 Telemetry and Controls The City of Bremerton utilizes a SCADA system to monitor and control the water supply and distribution system with a central computer and two redundant master telemetry units (MTUs). The system facilities utilize either remote telemetry units (RTUs) or programmable logic controllers (PLCs) to transfer data and signals. The computer system was first installed in 1992 to begin replacing the older tone telemetry panel system when the McKenna surface water system information was transferred to the SCADA system. Later, the system was upgraded to include automatic alarming, paging, remote accessing, and transfer of communications from telephone to the more economical radio system. This upgrade is scheduled for completion in 2006. 6.2.8 Preventive Maintenance Program Preventive maintenance for the Water Resources Division is tracked and scheduled utilizing maintenance management software (MMS) for the supplies, reservoirs, pump stations, hydrants, valves, and pipelines. Equipment information includes identification number, description, location, manufacturer, model and serial numbers, cost, startup date, and recommended spare parts. Programmed standard and site-specific preventive maintenance (PM) procedures and time intervals for each facility and piece of equipment are also entered into the MMS program. A PM Due Report lists preventive maintenance tasks that should be completed based upon the last date of service and specified service interval. The PM Due Report can be requested for any future date and shows all work to be completed before that date. The MMS will also forecast the number and type of hours needed to complete the preventive maintenance program for the specified period. Costs can be calculated based upon hours, materials, and parts. 6.2.9 Equipment, Supplies, and Chemical Inventory In addition to maintenance functions, the MMS includes a place for a record containing the name, address, telephone number, and contact for suppliers, including chemical suppliers. The Public Works and OtilitiesDepm:tment utilizes a Hazardous Materials ('nrnrnl1nir::ltl'nn~ Frnnlnvpp.R; aht_ Tn_K nn"T nrnOT<lrn .rnnt<l;n;no "Trittpn nrrH'prlllTPC <lnrl .......................................-............................. .............'-1 .A...J...........t'Jl"-'J............ ............~..... .......... .................'-J." .t'...'-"b........... ..... ......'-'.L...L~.......I.......}..6 ""....I.L.1.........I.}.. l-'..l'-'_.....~.......J.......u IU.................. provides annual mandatory training along with annual updates of the Material Safety Data Sheets (MSDS). The primary chemical utilized in the water supply system is chlorine for disinfection. Gas chlorine in excess of 1,500 pounds is listed as regulated under the Clean Air Act Risk Management Plan Rule (RMP) and OHSA's Process Safety Management (PSM). In 1999 Bremerton complied with the requirements of the RMP and PSM. Chlorine is Operations Program 6-7 2005 Bremerton Water System Plan stored and utilized according to the RMP at McKenna Falls, Anderson Creek, and Wells 15, 17, 18, and 20. Wells 9, 13, and 14 use a 12 percent sodium hypochlorite solution for disinfection. The other chemical used in large quantities is 50 percent sodium hydroxide (NaOH) used to raise pH at the entry to Reservoir 4 to minimize corrosion of customer plumbing for lead and copper. The NaOH is stored in two 4,000-gallon tanks inside the Corrosion Control Facility. A separate Operations and Maintenance Manual details operations for this site. SARA Title III, Community Right to Know, Tier Two Emergency and Hazardous Chemical Inventory forms have been completed for each of these sites, and annual reports are sent to the state, Kitsap County Department of Emergency Management, and Bremerton Fire Department. 6.2.10 Fluoridation In 1997, following a public hearings process, the Bremerton City Council voted to implement water fluoridation as soon as practical. The Water Utility began fluoridation system design and construction concurrent with the corrosion control treatment design and construction. Both systems were liquid chemical feed designs, allowing them to be housed together at Reservoir 4. However, due to considerable negative public response to the decision, the City Council agreed to re-evaluate and placed the issue on the February 1999 ballot following a citizen petition. Bremerton residents voted down fluoridation. At the time of the public vote, the fluoridation tank and equipment were in place but not yet in use. The 6,000 gallon solution tank remains in place, but all the other fluoridation components have been removed and surplused. 6.3 Water Quality Control and Monitoring 6.3.1 Source Water Quality Protection Several programs ensure that high water quality is maintained at the source. The Watershed Control Plan is required by the SWTR and contains the procedures the City implements to protect the water quality in the Union River watershed. The Wellhead Protection Plan contains the procedures the City implements to safeguard the water quality in each of the City's production wells. The recent updates of both the City of Bremerton and the Kitsap County Critical Areas Ordinances provide further protection of drinking water sources. 6.3.2 Routine Procedures 1 ne tsremerton water UtllIty has an extensive water quality monitoring program, administered by the Water Resources Division. Established sampling and testing programs described in the Drinking Water Quality Monitoring Plan conform to DOH rpnll;rpmpnt" <I" flpfinpfl ;n 'Xl Ii. r 'M.h_ ?O() 1<.;fr\nl.tnnnn ;n..l11rlp" "<lmnl;nn rpnlll.rerl b" ...........'10..&.1. ...........1..1."'-' .1.~"" L4.LY ......._.L..I..I.................. .I....... .....1....'-' ~ 1'-' ....../ '-'. 1\..&-.......... ...'-'.l........I.b ..........'-'...0..&........ ........., 0t,...l..IJ...IP .........0 .........."1'-'- J. '-l J regulations and conducted for process compliance with proposed regulations. monitoring is presented in Section 4. control and baseline generation to ensure More detailed information on water quality Operations Program 6-8 2005 Bremerton Water System Plan 6.3.3 State Reporting The Water Resources Division is responsible for preparing the following reports for the Washington State Department of Health: · Monthly state report on CTs, bacterial sampling, and other requirements · Quarterly monitoring for disinfectants and disinfection by-products · Semi-annual report of monitoring for the Lead and Copper Rule · Annual submittal of the Water Facilities Inventory Form · Annual report for the Surface Water Treatment Rule 6.3.4 Treatment and Monitoring Violation Procedures The Utility has established procedures in conformance with public notification regulations for cases when the system violates a primary water quality standard or fails to meet treatment, monitoring, and analytical testing requirements. Public notices must provide a clear explanation of the violation, adverse health effects, remedial action being taken, and steps the consumer should take to minimize risk. Notices are to be distributed by newspaper notice, direct mail, or hand delivery within specific time frames depending on the nature of the violation. If the violation is for acute coliform, nitrate, waterborne disease outbreak, or other acute violation determined by the department, broadcast media announcements are required within 24 hours of the violation. All public notifications need to be closely coordinated with DOH and the Bremerton- Kitsap County Health District. The Utility has a standard boil water notice to be used in such an emergency. 6.4 Valve Maintenance The goal of the water main valve maintenance program is to locate and ensure proper operation of all the valves in the Bremerton distribution system. Approximately 5,700 isolation valves are in the distribution system. The Valve Maintenance Program Manual contains the proper procedures for valve maintenance. 6.5 Hydrant Maintenance The goal of the fire hydrant maintenance program is to ensure adequate fireflow can be delivered and hydrant operation can be ensured for fire protection purposes. Approximately 1,600 hydrants exist within the distribution system. The Hydrant Program Manual contains the proper nroceduresfor hJvdrant maintenance. r . 6.6 Flushing Program The goal of the water main flushing program is to maintain water quality and clarity in the Bremerton distribution system by removing sediment and mineral buildup on a regularly scheduled basis. The Bremerton Water Utility Flushing Program Manual contains the proper procedures for flushing. Generally, each side of the water system is flushed every other year. Operations Program 6-9 2005 Bremerton Water System Plan The west side of the Port Washington Narrows is flushed one year, and the east side is flushed the next. The West 517 Zone system is flushed annually. 6.7 Customer Response and Education Program Bremerton Public Works and Utilities has a customer response program to promptly and effectively address the public's questions and concerns on broken mains, low pressure, discolored water, and other water system issues. A dedicated phone number (473-5920) is used as the Customer Response Line. A field technician assigned to the Customer Response position makes customer contact within two to four hours of the call and assesses the initial situation to provide accurate information to the proper division through a customer response work request. Customer response activities are logged into a database. Information on customer water quality concerns and questions are required to be submitted in the monthly report. In 1999 the requirements for the Consumer Confidence Report took effect, and the Utility's "Annual Water Quality Report" (Appendix) has been sent annually to all customers. This opportunity is also used to encourage customers to call the Customer Response Line with questions and concerns about their water. The Utility has prepared brochures and fact sheets to give customers regarding emergency preparedness, discolored water, chlorine taste, cross- connection control, indoor and outdoor water conservation, and leak detection. In addition to the activities listed above, the Utility is involved in several other customer outreach activities such as: · Water Festival for fourth-graders in March · Kitsap Home and Garden Show in March · Earth Day Events in April · National Drinking Water Week activities in May · National Public Works Week in May · Kid's Day at the Fairgrounds in June · Water Purveyors of Kitsap Fair Booth in August · Washington Water Weeks activities in September 6.8 Cross-Connection Control Program Cross connections are situations where the drinking water system is connected to some other vessel or system containing anything other than drinking water.. Such connections have the potential to allow backflow into the drinking water system and are considered to be cross connections. Wbere no such potential exists, there is no cross-connection.. The drinking water system routinely supplies water into contaminated systems, such as commercial sites, and the contaminated mixtures that result must always be prevented from flowing back to the drinking HTl)tt:'-r C'"C't~m \'" Lll-vJ. ...., J rJI..\"/JJ.1. Operations Program 6-10 2005 Bremerton Water System Plan Connections to non-drinking water systems can often be avoided entirely by building an air gap. A typical kitchen sink is a good example of an air gap. The faucet is mounted above the basin, and the potential for backflow is eliminated. Where air gaps are not possible, a variety of mechanical devices are employed to eliminate the possibility of backflow. The most common components of backflow prevention devices are check valves. However, other mechanisms are also employed, and a wide variety of designs are applied as circumstances require. These devices are typically redundant by design. For example, a double check valve assembly includes two valves. If one leaks the other will still provide the needed protection until periodic inspection and maintenance correct the problem. New development and redevelopment of properties served by the drinking water system have the potential to create new cross connections. The backflow prevention devices require inspections and maintenance. Cross-Connection Control Programs (CCP) address these and other issues. CCPs are required by Federal, 'State, and local laws. At the Federal level, the SDW A governs public health related issues associated with water supplies, including the control of cross- connections. State of Washington drinking water regulations, administered by DOH, are contained in WAC 246-290-490. Section 490 requires protection of public water systems from contamination via cross connections. The Code provides ten minimum requirements (elements) for a CCP, described below. One of these is in regard to establishing the authority to conduct and enforce the program. The full picture of cross-connection management is complex and includes building and plumbing codes, the local or regional health department, private certified backflow-prevention assembly testers, national organizations and institutions, and others. How Bremerton's program relies on or coordinates with these other entities is discussed below. Bremerton has established a CCP to meet requirements in WAC 246-290-490. DOH administers and enforces this section, which governs activities throughout the public water system up to the service connections (meters) of individual customers. The Bremerton Department of Community Development (DCD) and Bremerton's lead Cross-Connection Control Specialist (CCS) enforce the uniform plumbing code regarding cross connections within individual premises. The CCP lead coordinates with DCD and the DOH, sharing information as appropriate to contribute to the public effort to prevent contamination of drinking water via cross connections. This section has been developed to describe the City's CCP and includes: · An overview of the CCP · A description of each ofthe ten program elements required by WAC 246-290-490 · Reference to associated forms, submittals, and other items as necessary RrptTlPrt{)n' '" rrp },po<ln ;n thP' l<ltp' 1 Q7(\' '" <Inri' h<l'" OT{)nTn 'n,;th thP ",,,,,tpn"l ;'nh--:>"trllC'tllYP -:>nrl L.J..I...........I..I.........I.\,.'-"...... IJ" '--"'--'..I. ....,.......6'-4........ .1.1..1. ................. .................... ..../, V oJ '-4........~ .1..1.'-4""" 6.1.'-Jl'T.1.1.. "."........1..1. 1,..1..1'-' oJJ0L.......1.J..... .l.l..l.l..l......oJl-.J.~_l-..........l.......'Io.4-J..I.'-I- increasingly stringent regulations. The program is overseen by the Public Works and Utilities Department. The Utilities Operations Division is the lead in implementing the program and is assisted by and shares in the resources of other divisions, including the Engineering and Water Resources Divisions. Operations Program 6-11 2005 Bremerton Water System Plan The program tracks an inventory of over 1,500 backflow prevention devices and typically reviews more than 150 project submittals each year. The Department has five certified Cross- Connection Control Specialists and two certified backflow assembly testers on staff. The program relies on both premise isolation and in-premise isolation to control cross connections. Within the City, the backflow prevention devices the program is concerned with are located at both the service connection, where drinking water first flows from the public distribution system into the private "on-site" plumbing, and at fixtures inside the premises that may pose potential hazards. The City does not regulate in-premise isolation for customers outside the city limits. 6.8.1 Cross-Connection Control Program Elements WAC 246-290-490 requires CCPs to include at minimum, 10 elements to be considered acceptable. This section describes each of the minimum elements required by Washington State law and Bremerton's implementation of these elements. Element 1 - Legal Authority for Cross-Connection Control Program This element requires awater purveyor adopt a local ordinance, resolution, code, bylaw, or other written instrument that: · Establishes the purveyor's legal authority to implement a CCP; · Describes the operating policies and technical provisions of the CCP; and · Presents the corrective actj(lns to be used to ensure customers' compliance with the CCP. Bremerton 's Status The City has an established CCP as authorized by federal and state law. Title 15.02.170 of the Bremerton Municipal Code adopts by reference the State of Washington cross- connection control regulations and subsequent revisions. The City also issued a Departmental Policies and Procedures document in May 2001 that established compliance with all of WAC 246-290-490 as the minimum standard for the scope and goals of the CCP. This procedure establishes two widely used documents as the primary guiding resources for program details. These documents are: 1. The Cross Connection Control, Accepted Procedure and Practice Manual (most current edition), published by the Northwest Section of the American Water Works Association. (Hereafter referred to as the Northwest SectionManual.) 2. The Manual of Cross-Connection Control (most current edition), published by the Foundation for Cross-Connection Control and Hydraulic Research at the University of Southern Cali f0111i a. (Hereafter reft;lTi~d to as the use Manual.) Operations Program 6-12 2005 Bremerton Water System Plan Element 2 - Evaluation of New and Existing Service Connections This element requires each purveyor to develop and implement procedures and schedules for evaluating new and existing service connections. These evaluations must assess the degree of hazard posed by connections to the purveyor's system, and property owners must be notified of the results in a timely manner. Once an initial evaluation has been conducted, service connections must be re-evaluated periodically according to a schedule acceptable to DOH and whenever there is a change in use of the premises. Bremerton 's Status Bremerton's Cross-Connection Control Specialists (CCS) evaluate the degree of hazard for all new service connections when connections are re-instated after a period of non-use and whenever a change arises in use of a property served. The City's accounting department aids in tracking these events and actively provides information to the CCS. All building permit applications are routed through the CCS, and all divisions of the Public Works and Utilities Department are made aware of the need to relay information related to cross-connection control to the specialist. The City has developed a cross- connection control survey form that facilitates evaluations and record keeping. The City's plumbing permit process requires that an application for a service connection be made before the plumbing permit is issued. Utilities Operation Division staff also perform reconnaissance to find otherwise unreported cross connections, such as home- owner installed irrigation systems. The CCP database is also used to track new installations and any pending improvements. Late notices and visits to the premise are used to ensure resolution. The City reserves the right to install or repair assemblies at the premise boundary and bill the customer or terminate service if the customer remains unresponsl ve. The County's Dcn provides information when solicited, and the Kitsap County Health District shares information they discover as appropriate. The information from all these sources is directed to the CCS in order to provide a single-point comprehensive view of potential cross connections to the Bremerton drinking water system. All degree of hazard evaluations are conducted by a certified CCS employed by the City. Procedures include a site visit, interview with the owner or operator of the premises (or their representative), evaluation of the condition of existing backflow prevention devices, and consideration of the types of premises and related activities recognized as high health hazards in Table 9 of WAC 246-290-490. These evaluations also take into consideration relative probability of occurrence and other variables described in the Northwest Section and USC Manuals. All evaluations are documented and filed, and copies are provided to the owner of the premises within 30 days of the site visit. More information on recordkeeping and responses to the results of hazard evaluations is discussed under other program elements below. Operations Program 6-13 2005 Bremerton Water System Plan Element 3 - Cross-Connection Elimination, Control, and Prevention This element requires cross connections to be eliminated whenever possible or, where they cannot be eliminated, that approved backflow assemblies commensurate with the degree of hazard be properly installed. Bremerton 's Status Bremerton fulfills the requirements of this program element by the same basic approach employed to evaluate the degree of hazard (described above). This is primarily through the project/plan review process, other methods of collecting information, and enforcement of regulation and policy. Certain types of potential cross connections are prohibited, and air gaps are required wherever they are plausible. Where air gaps are not plausible, the results of the hazard evaluation and the following requirements and guidelines are used to determine the type of backflow prevention device required and the approved models available to choose from: · Tables 8 and 9 ofW AC 246-290-490 · DOH Publication 331-137, Backjlow Prevention Assemblies Approved for Installation in Washington State, Revised February 2005 · The Northwest Section Manual . The USC Manual Element 4 - Cross-Connection Control Personnel This element requires the purveyor to ensure that personnel are provided to develop and implement the CCP. At least one must be a certified CCS. Bremerton 's Status Bremerton's staff holds all CCP-related required certifications, and the City funds training commensurate with current and future program needs. The Utility Operations Manager and the lead CCS are both CCS certified. The CCS lead and other employees are backflow assembly testers (BATs). The CCS lead or persons under his direction implement, update, and otherwise manage the CCP. Contributions to the program come from staff in the administrative, engineering, and water resources divisions. Members of the Utility crews are also aware of and support the program. Element 5 - Backflow PreventerInspection and Testing The water purveyor must ensure that approved backflow preventers are inspected and tested for proper operation in accordance with WAC 246-290-490. Specific requirements related to inspection and testing and Bremerton's methods for complying with them include: · Confirming the type of back flow preventer is commensurate with the assessed degree of hazard. Operations Program 6-14 2005 Bremerton Water System Plan Bremerton 's Status Bremerton ensures scheduled tests, and the results of testing indicate the correct type of device is installed for the subject premise or application. The degree of hazard assessment itself is performed separately and discussed above. · Confirming the installation/configuration is correct and the make and model of the device (where applicable) is on the approved list. Bremerton 's Status These activities are associated with the actual testing of devices and are conducted primarily by private, certified BATs. Each new assembly is verified after it is installed. If the assembly is replaced, then the replacement is verified when test results are entered. Certified Bremerton personnel also evaluate the devices (including air gaps) by these criteria whenever they inspect. · Conducting inspection and testing: When installed - Annually thereafter (with certain specific exceptions) - After any backjlow incident - After repair, relocation, etc. By certified BA Ts - By acceptable methods (e.g., as outlined in the use Manual) Bremerton 's Status Bremerton assures these elements by following the project/plan review process mentioned above; keeping an inventory of all devices; scheduling, requiring and reviewing the tests; and requiring all testing be completed by certified BATs. · Effectively documenting inspection and testing results. Bremerton 's Status Bremerton requires BATs to report their results on a "Backflow Assembly Test Report" that prompts for all essential information and facilitates record keeping and use of data; · Requiring and enforcing corrective actions whenever the backflow preventer IS discovered to be inappropriate, incorrectly installed, or in need of repair. Bremerton's Status Bremerton seeks cooperative solutions with all customers but has the authority to discontinue water service until required improvements are complete. Bremerton Operations Program 6-15 2005 Bremerton Water System Plan exercises this authority according to risk. If emergency conditions or immediate health hazards exist, service may be terminated immediately. In circumstances where the degree of hazard is low, Bremerton requires improvements to be made as soon as possible but allows the customer up to 90 days to complete improvements. Enforcement actions are initiated by the CCS, who informs the Director of Public Works and Utilities and the building department, who in turn may contribute to the process. Every corrective action item is tracked through resolution and facilitated by letters and phone conversations as necessary. Element 6 - Quality Control Assurance Program The water purveyor is required to develop and implement a quality control assurance program for the testing of backflow prevention assemblies. Certified BATs are required to take steps to control the quality and reliability of their work, and purveyors, such as Bremerton, are required to assure they do so. The program must include at a minimum documentation of tester certification and test kit calibration, standard requirements for the contents of test reports, and requirements for submitting completed test reports in a timely manner. Bremerton 's Status Bremerton posts a list of approved testers who request to be on the list on the City's website (www.ci.bremerton.wa.us) and updates it periodically as a public service. Bremerton keeps copies of up-to-date certifications and test kit calibration results on file for the BATs who are on the published list. Any Washington State certified BAT may test assemblies in Bremerton's service area, but those who are not on the list must submit copies of current certification and test kit calibration with each report. The City notifies property owners of the need for testing about 30 days before the due date. If no report is received within that period, the property owner is notified through a late notice, establishing a deadline of 10 days after the late notification. If the property owner does not comply, the CCS follows up with a site visit or phone call. Problematic results are followed up with a phone call to the tester and possible inspection of the assembly in question. Element 7 - Backflow Incident Response The water purveyor is required to develop and implement procedures for responding to backflow incidents. Bremerton's Status The BremertonDepartment of Public Works and Utilities is prepared to respond to a wide variety of incidents related to the drinking water system. Evidence of poor water quality or possible contamination is resolved on a case-by-case basis. The methods Bremerton would employ in such cases are standard in the industry and include (but are not necessarily limited to) isolation/termination of source, flushing, containment by main isolation, water quality testing, customer notification, and coordination with other departments and agencies. Bremerton also has an Emergency Response Plan that would Operations Program 6-16 2005 Bremerton Water System Plan apply in some instances of contamination due to cross connection. Element 8 - Consumer Education This element requires a water purveyor to educate consumers about cross connections. The WAC recognizes that purveyors must have a broader public education program and requires information on cross connections be a part of it. Examples of educational materials include bill inserts, pamphlet distribution, and consumer confidence reports. Bremerton 's Status Information on cross connections is included in Bremerton's annual consumer confidence report. New customers receive brochures, and the City has conducted public outreach at events such as fairs. Brochures are also available in the lobby of the Public Works and Utilities Department, and information is mailed to any customer who inquires about cross connections or related issues. Whenever a premise is inspected, the owner of the premise receives a brochure and other information as appropriate. Element 9 - Record Keeping This element requires purveyors to keep up-to-date records documenting cross connection efforts and information, including: . A master list of service connections where backflow preventers are installed, as well as the assessed hazard level for the premises and the type (category) of backflow preventer( s) required for each; . Detailed information on each individual air gap, backflow assembly, and atmospheric vacuum breaker, including (as applicable): Location Date of installation History of inspections with results and inspector's name Product specific data, including model, size and serial number . CCP summary reports and backflow incident reports per WAC 246-290-490. Bremerton 's Status Bremerton has a record keeping system designed to be responsive to these codified requirements and includes all the necessary types of information. The effort to make it complete and keep it up-to-date is ongoing. Air gaps and backflow assemblies are being incorporated into the data base as they are being installed and discovered. Bremerton also submits an annual CCP report to DOH. Element 10 - Reclaimed Water Under this element, purveyors that distribute or have facilities that receive reclaimed water within their service area must abide by additional cross ro."'.............. ,"",ro.f~ r.......... ........--........+....,.." 1 lvUIUl\"''vUVll \....oVllll VI Opera/ions Program 6-17 2005 Bremerton Water System Plan requirements imposed by the DOH under a permit issued in accordance with Chapter 90.46 RCW (reclaimed water use permits). Bremerton's Status Currently, one private facility receives reclaimed water directly from Bremerton's wastewater treatment plant through pipelines not connected to the drinking water distribution system. These facilities, however, are also served by the drinking water system (via separate connection). Bremerton Public Works and Utilities coordinates the cross-connection control provisions of the reclaimed water use permit with the CCP associated with purveying drinking water. The CCP data base includes information on which premises receive reclaimed water, and the CCS considers this information during evaluations of degree of hazard. 6.9 Safety Program The Department of Public Works & Utilities produced a Departmental Safety Manual as an addition to the City's Accident Prevention Program. Although the City's Program is comprehensive in requirements for Confined Space Entry, Hazardous Material Communications, Job Hazard Analysis, Motor Vehicles, etc., the Departmental Manual takes into consideration those tasks unique to Public Works and Utilities Operations and expands safety requirements accordingly. Some specifics of the Departmental Manual not covered by the City's Program are: . Heavy equipment operation . Hazardous material/chemical handling · Hazard control . Specific responsibilities of both supervisors and employees . Tools and equipment . Job site safety · Vehicles: Driver qualifications Accidents and accidentinvestigations Excavating and trenching The Departmental Safety Manual is continuously reviewed by the Department Safety Officer and updated as necessary. h 10 Tr;lininn -..- .._......~ All Water Utility personnel are encouraged to seek training pertinent to job responsibilities. In- house training offered to employees on a regular basis includes first aid/CPR, flagging, chemical right-to-know, self-contained-breathing-apparatus use, and blood borne pathogen awareness. Division managers are responsible to ensure their employees receive at least monthly safety sessions. The Public Works and Utility Department has a budget for outside training and a policy for limited support of college level, job related classes taken during off duty time. Operations Program 6-18 ., 2005 Bremerton Water System Plan 6.11 Involvement in Professional Organizations The Water Utility is a member of the following organizations: · American W ater Works Association · American Water Resources Association · American Public Works Association · Groundwater Foundation · Association of State Dam Safety Officials · Washington Water Utility Council · Evergreen Rural Water of Washington · Partnership for Water Conservation Puget Sound · Water Purveyors Association of Kitsap County 6.12 Other Operation and Maintenance Responsibilities Tables 1-4 and 1-5 summarize operation and maintenance responsibilities that have been assumed by the City of Bremerton for contract customers. 6.13 Emergency Response Program 6.13.1 Standby Personnel List The Bremerton Water Utility has Telemetry Alarm Standby and Utility Operations Standby Schedules listing primary and secondary water utility personnel for both telemetry alarms and distribution problems. Tne list specifies the weeks assigned to standby, names, phone numbers, pager numbers, and addresses. Advisory staff is listed for standby personnel to contact depending upon the nature of the problem. This standby list is used by the CENCOM 911 Center when an after-hours emergency call through the 911 system or from the SCADA system is received. 6.13.2 Vulnerability Analysis and Emergency Planning The Public Health Security and Bioterrorism Preparedness and Response Act of2002 requires community water systems .to conduct vulnerability assessments (VA) under the authority of the U.S. Environmental Protection Agency. The law also requires water utilities to develop a new Emergency Response Plan (ERP) or enhance an existing ERP within six months of completing the V"I'1~. The VA process evaluates susceptibility to potential threats and identifies corrective actions that can reduce or mitigate the risk of serious consequences from adversarial actions such as vandalism, insider sabotage, or terrorist attack. This assessment takes into Operations Program 6-19 2005 Bremerton Water System Plan account the vulnerability of the water supply, transmission, treatment, and distribution systems. It also considers risks posed to the surrounding community related to attacks on the water system. An effective V A provides a prioritized plan for security upgrades, modifications to operational procedures, and policy changes to mitigate the risks and vulnerabilities to the Utility's critical assets. The V A provides a framework for developing risk reduction options and associated costs. The Bremerton Water Utility used the RAM-W method for developing a VA. This process was detailed, required extensive documentation, and consisted of several steps which complied with the following six basic elements required for the VA: . 1. Characterization of the water system, including its mission 2. Identification and prioritization of adverse consequences to avoid 3. Determination of critical assets 4. Assessment of the likelihood of malevolent acts from adversaries 5. Evaluation of existing countermeasures 6. Analysis of current risk and development of a prioritized plan for risk reduction The V A was conducted in-house by a team of City employees representing diverse areas of water system operations and security expertise. In addition, Bremerton hired a firm with security expertise to evaluate existing security measures and recommend future security improvements. EP A has identified eight core elements common to an ERP that form the basis for responding to any major event: 1. System specific information 2. Water system roles and responsibilities 3. Communication procedures: Who, What, and When 4. Personnel safety 5. Identification of alternate water sources 6. Replacement equipment and chemical supplies 7. Property protection 8. Water sampling and monitoring The purpose of the ERP is to identify planning and specific response actions to be taken during an emergency that \yill maintain quantity and quality of water, protect employees, minimize disruption to the public, and preserve property. This document addresses water emergencies that will behandled prinlarilyby the Utility as well as the Utility's support and cooperation with other agencies during large-scale emergencies. Casad Dam and Reservoir 4 are regulated by the Department of Ecology Dam Safety Section. The Utility has specific plans (Bremerton Dam Safety Emergency Action Plan and the Reservoir 4 O&M Plan/Emergency Action Plan) addressing dam safety. The Utility also has a specific emergency response plan for chlorine handling at the McKenna Falls Intake Facility as required by the RMP and PSM regulations described earlier. Operations Program 6-20 2005 Bremerton Water System Plan System failure prevention is accomplished by modern system design, watershed control and management, backup power supplies at critical locations, scheduled maintenance and replacement, water quality sampling and testing, remote system monitoring, routine facility inspection, automatic and manual control redundancy, and Utility personnel safety and operational training. Although the system design criteria include consideration of equalizing, standby or emergency and fire storage, there is always the remote possibility of a combination of events such as an earthquake causing significant system damage along with a large numbers of fires. Additionally, any facility could be out of service for a short period of time for planned maintenance and for a potentially longer period of time for unplanned maintenance. The most likely vulnerability for the water system is a large earthquake, as the probability of a large earthquake in the region is high. In the past five years, several earthquakes of magnitude up to 6.8 (February 2001 Benioff earthquake) have occurred. In 1997 the Utility conducted an Earthquake Vulnerability Analysis, which identified projects and budget estimates to upgrade transmission lines, reservoirs, and other system components to better withstand earthquakes. In 1996 several City and Utility staff members attended the FEMA earthquake simulation training in Maryland.. and will attend another FEMA training scheduled for 2006. 6.14 Operation and Maintenance Improvements The following improvements to the operation and maintenance of the Bremerton water system are planned in the next six years or are already underway: . Continuation of the security upgrades identified in the VA . Design of the ultraviolet system for compliance with SWTR regulations fit Improvements to disinfection and evaluation of chlorine gas alternatives . Upgrade of the SCADA to a fully PLC-based system Capital improvements are detailed in Chapter 9. 6.15 References Bremerton Casad Dam Operations and Maintenance lYfanual, as updated. Bremerton Coliform Monitoring Plan, as updated annually. Bremerton Corrosion Control Study, 1995. Bremerton Dam Safety Emergency Action Plan, updated annually. Bremerton Flushing Manual. 1994. Bremerton Inorganic/Organic Monitoring Plan, as updated annually, Operations Program 6-21 2005 Bremerton Water System Plan Bremerton Municipal Code. Bremerton Reservoir 4 Operation and Maintenance Manual/Emergency Action Plan. 1996 Bremerton Water System Earthquake Vulnerability Assessment. Dames and Moore. 1997. Bremerton Watershed Control Plan. 2006. Bremerton Wellhead Protection Program. AGI. 1996. City of Bremerton Emergency Operations Plan. 2006. Clean Air Act Risk Management Plan Rule. Department of Public Works and Utilities Safety Manual. Hydrant Program Manual. 1998 OSHA Process Safety Management. PNWS - A WWA Cross Connection Control Manual. SARA Title III Valve Maintenance Program Manual. Operations Program 6~22 2005 Bremerton Water System Plan Section 7 Performance and Design Criteria 7.1 System Demands Bremerton's average day demand (ADD) for 2004 was 7.7 MGD. This includes contract distribution of water to other districts and to the Puget Sound Naval Shipyard (PSNS). The average water use in the Bremerton Water Service area is approximately 183 gallons per day per equivalent residential unit (ERU). The highest maximum daily demand (MDD) between 1999 and 2004 was approximately 15 MGD. The ratio of this demand to the average daily demand is approximately 1.8. For purposes of analyzing the water system, the ADD will be multiplied by 2.0 to determine MDD, and the following assumptions will be used: . Residential Average Day Demand = 200 gallons per day per ERU . Residential Maximum Day Demand = 400 gallons per day per Single Family Unit · Peak Hourly Demand Multiplier =1.74 (PHD:MDD) 7.2 Pipe Sizing Parameters Water system pipelines are to be designed to limit velocities to 8 feet per second (fps) under peak hourly demand flow conditions. During normal average day demand flow conditions, the velocities should be limited to 5 fps. Pipelines must also be sized to pass fire flows with velocities less than 10 fps and without residual pressures dropping below 20 psi. The minimum pipe size for water lines is 6 inches for looped portions of water mains and 8 inches for dead ends. Also, fire hydrant leads less than 50 feet in length shall be at least 6 inches in diameter. 7.3 Fire Flow Standards A major function of the water supply and distribution system is to meet fire flow demands. This section summarizes the fire flow requirements applicable to the Bremerton water system, which serves areas both inside the city limits and in unincorporated Kitsap County. Bremerton serves water to residential and commercial structures in three fire districts: . City of Bremerton (within city limits) · Central Kitsap Fire and Rescue (north of the city limits) . South KitsapFireand Rescue District #7 (south ofthe city limits and Port of Bremerton) The Bremerton Fire Department adopted by ordinance Appendices Band C of the International Fire Code (IFC), listed in Table BI05.1 in the IFC. The Kitsap County Fire Marshal's office adopted a separate fire flow and hydrant placement, Ordinance 323(A)-2005, amending the IFC. Water System Description 7-1 2005 Bremerton Water System Plan The fire flow requirement for specific projects IS dependent on many factors, including the following: . Size of the structure( s) . Location of the project · Type of construction materials · Number of stories · Building fire protection systems (sprinklers, automatic fire doors, etc.) . Proximity of adjacent structures · Type of building occupancy (storage of flammable materials, etc.) For purposes of this water system plan, minimum fire flows to be provided by the Bremerton water system have been identified as: Residential Commercial 1,000 gpm for 2 hours I ,500gpm for 2 hours Fire flows required by the IFC are considered minimums for new construction. When evaluating new construction, Bremerton Public Works and Utilities Department personnel shall determine the ability of the water system to meet fire flow requirements at that location with a minimum of 20 psi residual pressure throughout the distribution system. If the water system cannot provide the required fire flow for the specific project, the developer is required to revise building construction and/or make the necessary improvements to the distribution system to meet the project's fire flow requirements as established by the Fire Marshal. The Washington Survey and Rating Bureau is a non-profit organization funded by subscribing property insurance companies in accordance with the Washington State Insurance Code. They are tasked with rating the fire fighting and protection abilities for municipalities. This rating is then used by insurance companies for setting rates. The water system's capability is 39 percent of the total rating score. Bremerton's last survey was completed in 1997, and the water system ranked as Class II, an excellent rating. The hydraulic analysis of fire flows for the Bremerton water system is discussed in Section 8, fire flow and storage requirements. Bremerton analyzed storage capacity without nesting fire suppression and emergency standby storage. 7.4 Backup Supply/Systems It is highly desirable to have as much redundancy as economically feasible within the water system. This is particularly true with respect to meeting fire flow requirements. Frequently, fires and system disruption can occur as a result of natural disasters such as earthquakes. Power outages, regardless of cause, can severely impact fire fighting efforts if a pump station is affected, or if fire fighting water is supplied from a nearby well. For these reasons, the City of Bremerton employs the following system redundancy measures: Water System Description 7-2 2005 Bremerton Water System Plan . Redundant components in the surface supply disinfection facilities. . Multiple wells in each of several wellfields located in different aquifers. . Multiple pumps (two minimum) in all but one pump station (PS14 has only one'pump but has a backup in PS 11). . Multiple transmission mains. . Isolation valves at critical connections and spaced along major transmission mains so that damaged portions of main can be easily isolated and repaired. . Multiple storage reservoirs for each major pressure zone except the West 650 Zone. This zone has one reservoir but currently has excess capacity for that zone. . A looped distribution piping system. . Multiple water mains serving large major customers such as the Navy and Harrison Hospital. . An adequate number and location of fire hydrants. . Adequate storage of water in reservoirs to supply fire flows. . A vailabilityofback-up emergency power for wellfields, pump stations, and booster pump stations (depending on available storage) and transfer switches for generator connection. . A 150 kW trailer-mounted generator to move to needed locations. . Telemetry systems with alarms for critical components in the system and automatic call-out of operations personnel. The City encourages future project development to be designed and constructed using fireproof materials, partitions, and fire sprinklers to minimize fire protection demands. A specific analysis of the water system is performed for each new development project to determine fire flow requirements and water system improvements required to provide adequate fire protection. 7.5 System Design Standards This section presents a summary of the general design criteria for the distribution system. Two standards documents, "The City of Bremerton Utilities Development and Construction Standards" and the "Standards for Work in the Rights of Way" are developed by the Department of Public Works and Utilities. Minimum design standards are also described in the Kitsap County Coordinated Water System Plan. This section presents some of the criteria used to analyze the existing and proposed system to identify any deficiencies that may exist. The analysis of the system will be discussed in more detail in Section 8. 7.5.1 General All new developments connecting to the system shall be designed by a civil engineer registered with the State of Washington. Water System Description 7-3 2005 Bremerton Water System Plan The City of Bremerton retains the right to review and approve the design and inspect all new facilities during construction and prior to being placed in service. Connections to the existing water system must be in accordance with City of Bremerton Utility standards. Service lines shall be installed so each residential, commercial, and industrial structure has a separate meter. If approved by the City, domestic water consumption may be measured by a master meter for service to a complex under single ownership and where water utility line separation is impractical. 7.5.2 Pipelines Water lines are to be constructed within city or county right-of-ways or utility easements. These easements should be at least 15 feet wide. Pipelines should be located at least 5 feet inside the boundary of all easements and right-of-ways. Minimum pipe sizes and velocities were specified previously in Section 7.2. All pipelines should be looped where possible. At a minimum, pipe materials should meet A WW A Standard C 100 for ductile iron pipe and fittings unless approved by the Utility prior to installation. Transmission mains should be at least 12-inch diameter and not have any service connections. Larger diameter mains will be required if the Water Utility determines that a larger diameter is justified based on the hydraulic analysis. All water mains should have a minimum cover of 36 inches over the top of the pipe. Minimum separation distances between water mains and sanitary sewer mains should be ten feet horizontally when the mains are parallel. Adjustments to these requirements may be allowed if the proposed adjustments are within the latest guidelines published by the Washington State Department of Ecology. A minimum separation distance of five feet horizontally is to be maintained between water mains and storm sewer systems and the water main shall be a minimum of two feet above the storm sewer when crossing. Lesser separations will be allowed if it is shown it is not feasible to locate the water main further away. All new piping should be pressure tested to a minimum of 150 psi over normal working pressures (but no less than 225 psi total) for 15 minutes per the requirements of the latest edition of the WSDOT IAPW A Standard Specifications for the State of Washington. Water System Description 7-4 2005 Bremerton Water System Plan 7.5.3 Automatic Control Valves - Pressure Regulating, Reducing, and Relief Automatic control valves are used to intertie the Utility's pressure zones to utilize stored water at higher elevations and to lower pressures to acceptable service levels. These valves will be sized to provide the maximum instantaneous demand or the required fire flow, whichever is greater. In some areas where the system line pressures exceed 80 psi, it is recommended that customers install individual pressure reducing valves on their service lines. 7.5.4 Transmission and Distribution Piping Valves A sufficient number of valves are installed in the system to allow isolation of the system for maintenance and repair. As a guideline, valves should be located at all tees and crosses and have a maximum spacing of 500 feet. Two-inch minimum air and vacuum release valves should be installed at all high points in the piping system. Zone isolation valves should be installed at all zone boundaries. This arrangement could allow future pressure zone boundary realignment without the need for additional pipe construction. 7.5.5 Fire Hydrants Fire hydrants should be 5-1/4 inch or larger. Hydrants should be spaced a maximum of 500 feet apart in residential areas and a maximum of 300 feet apart in multi-family residential areas, commercial areas, and industrial areas. Six-inch fire hydrant leads should be no longer than 50 feet. Fire hydrant leads greater than 50 feet in length shall be 8-inch diameter minimum. Hydrants should be dry-barrel construction, conforming to A WW A C502, and equipped with national standard threads or devices. Fire hydrant type, features, and spacing must be approved by the Utility and fire protection authorities. 7.5.6 Disinfection and Testing All new.piping, reservoirs, and appurtenances .must be flushed, disinfected, and tested in accordance with the standards of DOH, AWWA C600 and DI05, or WSDOT/APWA Section 7-09. Water System Description 7-5 2005 Bremerton Water System Plan 7.5.7 Cross Connection Control Where a possibility of contamination of the potable water system exists, appropriate cross connection control measures must be taken to protect the water system. Refer to Bremerton Municipal Code Title 15.02.170 and WAC Chapter 248-54-285, Cross Connection Control, and Section 6.8 of this WSP. 7.5.8 Other Guidance Standards The following are other standards (latest editions) used in the design of the Bremerton water system: . Washington State Department of Health Water System Deign Manual . Washington State Department of Transportation Road and Bridge Specifications . American Water Works Association Standards . NSF Listings for Drinking Water Treatment Chemicals and System Components . State Standards for Water Works (10 states) . Kitsap County Coordinated Water System Plan . Washington State Department of Ecology Criteria for Sewage Works Design Water System Description 7-6 2005 City of Bremerton Water System Plan Section 8 System Analysis -- 8.1 Hydraulic Analysis 8.1.1 Methodology The City of Bremerton Main and West 517 Zone Systems were analyzed using the hydraulic modeling software program WaterCAD 7 Service Pack 2 by Bentley, Inc. The WaterCAD software is a Microsoft Windows-based program that interfaces with AutoCAD to allow entry of all system properties and displays them on the monitor as an AutoCAD drawing file. All modeling calculations are performed within the WaterCAD program, and the AutoCAD program allows the user to display the results in various color coding schemes depending on the desired appearance. 8.1.2 System Components The WaterCAD software allows all of the pipes and junction nodes to be entered into one complete model, which consists of approximately 2,450 pipes and 1,800 junction nodes, along with pressure reducing stations, reservoirs, wells, and pump stations. The number of system components in the model is different from the actual number found in the Bremerton water system, because some operations are simulated differently in the model than they are in the existing system. All of the system data, such as pipe diameters, reservoir areas, and node elevations, were entered into the model by the City based on water system maps. A copy of the model input data and a map showing the node and pipe numbers are contained in a separate document. 8.1.3 Current System Demand When the model was originally developed in 1999, the City was divided into 62 separate meter zones reflecting similar residential and commercial demands throughout the system. The boundaries of the meter zones were overlaid onto the water model to establish the number of junction nodes in each zone. Demands Were allocated to the nodes in each of the meter zones by using residential demands for the entire meter zone divided by the number of nodes in the model representing that zone. The model was updated to reflect present day demands in the following manner: . All the demands in the model except the PSNS demands were summed to determine the ADD represented by them. . Actual PSNS demands were inserted into the model at the nodes representing the three master meters serving the shipyard. . The demands at the remaining nodes of the Main System were multiplied by a correction factor to increase the total demand in the model to the current ADD of 7.9 System Analysis 8-1 2005 City of Bremerton Water System Plan MGD. · A second demand alternative was created for the Main System to provide a current system-wide MDD of 15.82 mgd. · A separate demand projection was used for the West 517 Zone System, as all its future growth is commercial and will rely on the development schedule for the South Kitsap Industrial Area (SKIA), which has not yet begun, and the possible construction of a NASCAR Race Track, which is still in the very preliminary planning stages. Residential demands in the model were assigned a diurnal or daily usage pattern based on the Washington Department of Ecology (Ecology) diurnal curve. Large commercial demands were assigned either this diurnal curve or a fixed pattern based on the type of commercial enterprise and probable water usage pattern. PSNS demands are assumed to follow a fixed usage pattern. This assumption has been verified through field measurements where the maximum flow through the meters in a 24-hour period exceeds the minimum flow by only 20 to 30 percent. All commercial demands included in the model were assigned to the nearest junction node, except for PSNS. PSNS has a commercial ADD of 2.28 MGD distributed among three different junction nodes representing the three master meter locations. MDD is assumed to be 2.0 times ADD, fora current PSNS MDD of 4.56 mgd. 8.1.4 Calibration The Water Utility performed a number of hydrant flow tests throughout the system to determine flow, static and residual pressure, and pressure drop in known segments of pipe. For the calibration analysis, a single "snapshot" (steady-state) simulation was used to calculate flow throughout the system for a single point in time. This simulation assumes the system reaches equilibrium with respect to flows instantaneously. The information from the model run was used to compare the static and residual pressures associated with the model simulations and each hydrant test to determine the accuracy of the model. Successful calibration of the static pressure indicates network components are operating correctly, demand is appropriately allocated, and reservoir levels are correct. Successful calibration of tlle residual pressure and pressure drop during the hydrant tests indicates pipe roughness coefficients are set at the appropriate level similar to actual conditions. Eight hydrant flow tests covering the full system area were performed in the field and simulated with the model. Table 8-1 shows the results of each hydrant flow test, along with the results of the model simulations at each location. System Analysis 8-2 2005 City of Bremerton Water Sysh::m Plan Table 8-1 Calibration Hydrant Flow Test Results Residual Pressure Pressure Difference Location/Pressure Zone Total Flow (gpm) Static Pressure (psi) (psi) (psi) 686 Woods Place Field Results 674 66.00 60.00 6.00 E490 Model Simulation 66.66 65.40 1.26 9365 Central Valley Rd Field Results 769 77.00 67.00 10.00 E398 Model Simulation 75.14 64.41 10.73 13th and Vandalia Field Results 769 110.00 105.00 5.00 E398 Model Simulation 110.30 102.76 7.54 Trenton and Shore Field Results 674 85.00 80.00 5.00 E240 Model Simulation 85.06 82.21 2.85 6790 Peterson Dr Field Results 769 77.00 62.00 15.00 E240 Model Simulation 72.59 65.26 7.33 Ferry Telminal Field Results 1,450 95.00 87.00 8.00 W256 Model Simulation 96.25 87.66 8.59 2530 Rocky Point Field Results 880 70.00 60.00 10.00 W256 Model Simulation 64.95 54.32 10.63 1038 Kitsap Lake Rd Field Results 1,065 108.00 80.00 28.00 W440 Model Simulation 108.85 80.45 28.40 s''ystem Analysis 8-3 2005 City of Bremerton Water System Plan The first five locations listed in the table are situated in the east pressure zones of the City and show reasonable agreement between the hydrant test results and the model simulation results. The static pressures for each of the five locations during the simulations are consistently plus or minus approximately 4 psi from the model, indicating that the reservoirs, pump stations, and PRV s are operating correctly and that demand is allocated appropriately. The residual pressures and pressure drops are also reasonably close to the model simulations, indicating that the roughness coefficients are close to the actual conditions. The last three locations listed in the table are found in the west pressure zones of the City, and the simulation for one does not agree with the test results. The hydrant test conducted at 2530 Rocky Point gave a static pressure of 70 psi, a residual pressure of 60 psi, and a drop of 10 psi. The model simulation showed agreement with the pressure drop, but it also showed significantly lower static and residual pressures. This indicates the system is operating properly, but lower pressures are shown in the model than in the existing system. Several possible explanations for this difference include reservoir elevations simulated at a lower level in the model than during the field test or incorrect elevations for the pressure gages. It was not possible to obtain a better correlation between field and model values with the available calibration information. The City is investigating the differences between the field results and the model and will edit the model as needed. From this information, it appears the model is reflecting field conditions to a level adequate for planning purposes. The City is continuing to improve the accuracy of the model for use in design and fire flow analysis for specific new developments. Calibration of the model will continue as new field tests occur and the data from the field will be transferred to the model. 8.1.5 Future System Demand In six years (by 2011), the ADD for the Main System, excluding potential conservation savings, is expected to increase to approximately 9.15 MOD, and the MDD is forecasted to be 18.29 MOD. By the year 2024, the ADD is expected to increase to about 11.91 MOD, and the MDD is forecasted to be 23.83 MOD. Again, both of the ADD demands are based on population and demand forecasts and the assumption that there would be no savings due to water conservation strategies. For modeling purposes, use of higher demands throughout the system provides a more conservative result than using the demands projected using conservation. All of these future demands were allocated in the water model by setting the demand for the three PSNSjunction nodes and multiplying the remaining 2005 demand by a constant value to increase the total demand to the forecasted amount. The demand for each junction node was then entered into different model scenarios depending on which forecasted year was being modeled. System Analysis 8-4 2005 City of Bremerton Water System Plan This assumption does not precisely reflect the projected growth in Bremerton. Growth will occur at higher rates in selected areas than for the overall city. This allocation of demands allows a planning level analysis of the water distribution system, with the understanding that a more detailed model will be used to evaluate specific parts of the system. For the West 517 Zone System, future demands are assumed based on planning documents for SKIA, a commercial development area. Development of SKIA is dependent on sewer service, which has not been resolved. This industrial area is currently served by an on-site septic system, which is the current limiting factor to growth. 8.1.6 Modeling Scenarios The WaterCAD model was constructed with a number of different modeling scenarios to reflect system demands and piping configurations in years 2005, 2011, and 2024 and determine the system operation in those years. Table 8-2 shows the scenarios identified below and lists the overflow and starting elevation for all the reservoirs in the system, capacity and the status for each pump station and well, and type of simulation performed (static or extended period). The following specific scenarios were run: . Calibration . Determination of Current CIP Requirements (i.e., improvements needed to mitigate current distribution system issues) - Current PHD (existing system) - Current MDD with Fire Flow (existing system) - Current PHD (Current CIP) - Current MDD with Fire Flow (Current CIP) . Determination of 6-year CIP (i.e., identifY the projects needed by 2011) - 2011 PHD (2024 CIP) - 2011 MDD with Fire Flow (2024 CIP) - 2011 PHD (2011 CIP) - 2011 MDD with Fire Flow (2011 CIP) . Determination of20-year CIP (i.e~,improvements needed to mitigate system issues caused by demands anticipated after 20 years of growth) - 2024 PHD (Current CIP) - 2024 MDD with Fire Flow (Current CIP) - 2024 PHD (2024 CIP) - 2024 MDD with Fire Flow (2024 CIP) System Analysis 8-5 " 2005 City of Bremerton Water SY::nem Plan . ummary 0 Ire ow an ea our cenano ase on lions . 2005 Average Day 2005 PHO 2005 MOD 2011 PHO 2011 MOD 2024 PHO 2024 MOO Facility (Calibration) Fire Flow Fire Flow Fire Flow Tanks: Zone Overflow Elevation Initial Elevation 4 . W256 255.9 253.9 250.3 238.6 249.8 236.7 248.5 228.0 5A W256 241.9 239.9 250.3 238.6 249.8 236.7 248.5 228.0 5B . W256 241.9 239.9 250.3 238.6 249.8 236.7 248.5 228.0 6 . W440 447.2 445.2 435.3 401.5 434.7 399.6 433.4 415.8 . 8 W440 441.0 439.0 435.3 401.5 434.7 399.6 433.4 415.8 10 W517 515.6 513.6 508.7 490.0 504.7 478.4 480.8 477.9 11 E240 239.8 237.8 236.8 232.2 236.7 229.3 236.4 224.8 12 E398 397.0 395.0 394.4 385.3 394.2 384.5 393.6 381.8 13 E399 398.0 396.0 394.4 385.3 394.2 384.5 393.6 381.8 14 (Not in Use) N/A N/A N/A N/A N/A N/A N/A N/A N/A 15 W490 489.5 487.5 485.9 468.5 485.7 467.8 485.2 465.2 16 E240 238.9 236.9 236.8 232.2 236.7 229.3 236.4 224.8 17 E398 398.1 396.1 394.4 385.3 394.2 384.5 393.6 381.8 18 E490 489.4 487.4 485.9 468.5 485.7 467.8 485.2 465.2 19 E240 239.1 237.1 236.8 232.2 236.7 229.3 236.4 224.8 20 E398 398.1 396.1 394.4 385.3 394.2 384.5 393.6 381.8 21 W256 255.4 253.4 250.3 238.6 249.8 236.7 248.5 228.0 23 W650 652.3 650.3 650.2 640.5 650.2 640.5 650.2 640.4 Pump Stations: Zone Caoacitv (I!om) Status During Simulation 2 W256 4,000 On On On On On On On . 3 Boosted W256 200 On On On On On On On BS3 Boosted W256 300 On On On On On On On 4 W440 1,500 Off Off Off Off OIT Off OIT S Table 8-2 City of Bremerton Hydraulic Model f F FI d P k H S . B C dT System Analysis 8-6 2005 City of Bremerton Water SY:nem Plan BS6 (I) Hawthom Ave. 120 N/A N/A N/A N/A N/A N/A N/A . BS7 (I) Cook Rd. 60 N/A N/A N/A N/A N/A N/A N/A 8 W650 1,750 On On On On On On On BS9 (1) Quarry St. 60 N/A N/A N/A N/A N/A N/A N/A 10 W517 3,640 Off Off OfT Off Off OIT Otr II E398 1,400 Off Off Off Off Off Off Off 12 E490 950 Off Off Off Off Off Off Off 13 E490 1,000 On On On On On On On 14 E398 600 On On On On On On On 16 E398 1,250 Off Off On Off On OIT On 17 W440 1,500 On On On On On On On Wells: Surface Source W256 12,500 On On On On On On On 2R (I) PS2 800 N/A N/A N/A N/A N/A N/A N/A 3 (I) PS2 400 N/A N/A N/A N/A N/A N/A N/A 6R (1) PS2 1,400 N/A N/A N/A N/A N/A N/A N/A 7 (I) PS2 340 N/A N/A N/A N/A N/A N/A N/A 8 (I) PS2 600 N/A N/A N/A N/A N/A N/A N/A 9 E398 270 On On On On On On On 13 E398 510 On On On On On On On 14 E240 180 On On On On On On On 15 W517 205 OlT Off Off Off Off Off Off 17 W256 735 On On On On On On On 18R W517 375 OfT Off OtT Off Off Off OfT 19 W517 240 OfT OtT Off OtT OtT OtT Off 20 W256 1,150 On On On On On On On Table 8.2 Continued I. Not included in hydraulic model System Analysis 8-7 2005 City of Bremerton Water System Plan These simulations will produce a Capital Improvement Program for the next 20 years that will enable the City to surpass the minimum pressures set by DOH and identify the improvements required within the next six years. According to WAC 246-290-230, water systems must be designed to deliver PHD at 30 psi at all points in the distribution system with equalizing storage depleted. The distribution system must also provide MDD plus the required fire flow at a pressure of at least 20 psi at all points in the pressure zone with equalizing and fire flow storage depleted. This analysis was achieved in WaterCAD by completing the following actions: . In general, the model was run in steady-state mode using two different demand alternatives, depending on the scenario being studied. To determine if the system met the PHD (minimum pressures of 30 psi), a steady-state simulation was used with demands set at the peak hour level. Reservoir levels were set at the levels identified in Table 8-2 to approximate depletion of the equalizing storage. Reservoir levels controlled the operation of pumps and wells in the system. If a pump would be called to operate at the reservoir level used in the analysis, it was in operation during the simulations. . For the fire flow analysis, a steady-state simulation was used. Reservoir levels were set at the point where equalizing and fire flow storage are depleted. This reservoir elevation corresponds to the condition at the end of the fire event. Reservoir levels controlled the operation of pumps and wells in the system. A fire flow of 1,000 gpm was desired at all the residential nodes in the system, and 1,500 gpm was desired at commercial sites. Selected nodes were simulated with higher flow rates, depending on their locations with respect to commercial/industrial facilities. More information on the fire flow simulations is provided below. The MDD scenarios were run with McKenna Falls Intake contributing no more than 18 MGD to the system. 8.2 System Physical Capacity Analysis System physical capacity is defined by DOH as the components or facilities (i.e., source, treatment, storage, transmission, and distribution) that either individually or in combination limit the number of ERUs that can be served. For Bremerton's system, an ERU equals about 200 gallons per day (ADD). The ERU calculation is described in Section 2.4.3. The overall design goal of maintaining adequate pressure of at least 30 psi in the distribution system at peak hourly demand and 20 psi under peak hourly demand plus fire flow conditions must be adhered to in determining physical capacity. A water system's overall physical capacity must be determined in ERUs from its most Jimiting design element. Bremerton's physical capacity is 56,711 ERUs based on storage as identified in the calculations summarized in Table 8-3. The description of the calculation of the physical capacity for each facility is described later in this section. System Analysis 8-8 2005 City of Bremerton Water System Plan peCIIC lyslca apaclty In S Facility Physical Capacity in ERUs ADD MDD Water Rights] Qa = 29.2 MGD Qi = 41.1 MGD 146,000 102,750 Source Table 8_42 Qa = 15.3 MGD Q I = 29.0 76,500 72,500 MGD Treatment Capacity 76,500 73,500 (Disinfection and corrosion control only) Storage Capacity) (total) N/A 46,118 Table 8-3 Bremerton Water System Physical Capacity Documentation S "f Ph I C . ERU I. Does not include supplemental sources for Qa (Wells 8 and 9). Assumes 200 gpdlERU for ADD and 400 gpdlERU for MDD. See Table 3-6. 2. Assumes firm yield for Qa. Does not include supplemental sources (Wells 8 and 9) or storage. Assumes 200 gpdlERU for ADD and 400 gpdIERU for MDD. See Tables 1-2 and 8-4. 3. This value is the maximum number of ERUs that can be served by existing storage and was developed by changing the MDD in the Max ERU column ofTables8-5, 8-11, and 8-12 until the Storage Surplus/(Deficiency) value equals zero. The value for existing storage> 30 psi corresponds to the Equalizing Storage Capacity line and the value for existing storage . . >20 psi corresponds to the Total Storage Capacity line. The number of ERUs is calculated from the MDD based on 400 gpdfERU. There are two different values forthe number ofERUs for the existing storage >30 psi and >20 psi. Note that in the tables one of the storage surplus/(Deficiency) values is zero and the other one is positive. When you zero the other one, the one that is currently zero will become negative. The MDD total for both storage surplus/(Deficiency) values was calculated and left in the one with a zero and a positive value in the final table. Sum oflimiting ERU value for east and west zones (including the West 517 Zone): Equalizing Storage Capacity (West) Table 8-5 Equalizing Storage Capacity (East) Table 8-11 ERUs 35,355 96,148 131,503 Total Storage Capacity(West) Table 8-5 Total Storage Capacity (East) Table 8-11 24,269 21,849 46,118 The total number does not necessarily reflect the total volume in the pressure zone, but reflects the relative amount of storage that is available above 30 or 20 psi and the required amount of storage. The number of ERUs that could be served considering total storage capacity mayor may not be more than the total number that could be served considering equalizing storage capacity. The maximum number of ERUsthat could be served with the existing source, treatment, and water rights is in excess of the existing number of customers projected for 2024( calculations shown in Table 8-4). The total is limited by storage capacity. Source capacity is calculated for both ADD and MDD conditions. The difference in source amount for the two conditions is caused by differing assumptions for the surface source. For ADD conditions, the capacity of the surface source is limited by the firm yield estimate of the surface supply (5.6 mgd). For MDDconditions the surface source capacity is limited by the treatment plant capacity (18.0 mgd). The calculation of source adequacy compares the available source with the projected demand. The maximum number of ERUs that can be served is determined when demand and source capacity are equal. The ultimate limiting factor is the lesser of the totals for ADD and MDD conditions. System Analysis 8-9 2005 City of Bremerton Water System Plan Apart from the system-wide storage inadequacy discussed above, specific pressure zones will be deficient in storage prior to 2024. Detailed storage adequacy calculations are included in Section 8.4. Storage deficiencies are located in the western portion of the system. The CIP contains items proposed to mitigate the deficiency and increase the system capacity to a level greater than the proposed 2024 demands. System Analysis 8-10 2005 City of Bremerton Water Systelll ~Ian' Table 8-4 Evaluation of Source Adequacy for Bremerton Water Svstem Year 2005 2011 2024 Max ERU (4) Projected ERUs and Demand (gpd) (I) Equivalent Residential Units (ERUs) (2) 41,065 46,602 69,815 72,594 Average Day 8,308,000 9,783,000 13,958,000 14,513,601 Peak Day 16,616,000 19,556,000 27,926,000 29,037,600 Available Source MDD (gpd) (3) Surface Supply (12500 gpm) 18,000,000 18,000,000 18,000,000 18,000,000 PIS 2/Anderson Creek Wells (4000 gpm) 5,760,000 5,760,000 5,760,000 5,760,000 Well #9 (270 gpm) 388,800 388,800 388,800 388,800 Well #13 (510 gpm) 734,400 734,400 734,400 734,400 Well #14 (180 gpm) 259,200 259,200 259,200 259,200 Well #15 Pump (205 gpm) 295,200 295,200 295,200 295,200 Well #17 (735 gpm) 1,058,400 1,058,400 1,058,400 1,058,400 Well #18R Pump (375 gpm) 540,000 540,000 540,000 540,000 Well #19 Pump (240 gpm) 345,600 345,600 345,600 345,600 Well #20 (1150 gpm) 1,656,000 1,656,000 1,656,000 1,656,000 Total Available Source (gpd) 29,037,600 29,037,600 29,037,600 29,037,600 MDD Source Surplus/(Deficiency) 12,421,600 9,481,600 1,111,600 0 System Analysis 8-11 2005 City of Bremerton Water Syste... Plan Available Source ADD (gpd) (3) SUlface Supply (3,889 gpm) 5,600,000 5,600,000 5,600,000 5,600,000 PIS 2/Anderson Creek Wells (3,310 gpm) (Well 8 Supplemental source) 4,766,400 4,766,400 4,766,400 4,766,400 Well #9 (0 gpm), Supplemental Source only 0 0 0 - Well #13 (510 gpm) 734,400 734,400 734,400 734,400 Well #14 (180 gpm) 259,200 259,200 259,200 259,200 Well #15 Pump (205.gpm) 295,200 295,200 295,200 295,200 Well #17 (735 gpm) 1,058,400 1,058,400 1,058,400 1,058,400 Well #18R Pump (375 gpm) 540,000 540,000 540,000 540,000 Well #19 Pump (240 gpm) 345,600 345,600 345,600 345,600 Well #20 (1150 gpm) 1,656,000 1,656,000 1,656,000 1,656,000 Total Available Source (gpd) 15,255,200 15,255,200 15,255,200 15,255,200 . ADD Source Sumlus/(Deficiency) 6,947,200 5,472,200 1,297,200 741,599 Table 8-4 Continued I. Oemandforecasts from Table 2-4, without conservation. 2. Number of ERUs for specific years from Tables 2-5 and 2-6. 3. Available sourceassunies source pumps are on for 24 hours in a day at the maximum production rate. Pump Capacities aretaken from the City of Bremerton Water Plan. Capacity of SUlface Supply is based on treatment plant capacity. ADO capacity (finn yield of source) is based on 5.6 MGO and does not include supplemental sources (Wells 8 and 9). 4. Max ERU based on MOO capacity. Number of ERU is calculated from POD and is based on a system-wide total of 400 gpd per ERU. System Analysis 8-12 2005 City of Bremerton Water System Plan 8.3 Fire Flow Analysis One of the features of WaterCAD is the ability to run fire flow simulations at every node in the system during a single modeling run. The model assigns a fire flow to each node individually, and determines the available fire flow and residual pressure at that node, the minimum pressure in that specific pressure zone, and the minimum pressure throughout the entire system. Using the fire flow options in the model, each node in the Bremerton system was assigned a fire flow of either 1,000 or 1,500 gpm, depending on whether the area was residential or commercial. The simulation determined if the flow could be met while maintaining a minimum residual pressure of 20 psi at all distribution nodes in the system during the 2004 MDD event with water levels in the reservoirs set at the elevation where equalizing and fire flow storage are depleted. After performing the fire flow simulation at every node in the system, the nodes that did not satisfy the required fire flow while maintaining the minimum residual of 20 psi were singled out for more detailed analysis. This analysis consisted of identifying specific pipe improvements necessary to provide the required fire flow. The improvements were identified by assigning the appropriate fire flow to a specific node and color-coding all the pipes according to head loss. With the fire flow in place, the pipes with the highest head losses were upgraded until the fire flow requirement was met. The fire flow was then moved to each different node on the deficiency list, which potentially resulted in additional pipe upgrades to satisfy all fire flow requirements. Some of the deficiencies were created not by a minimum pressure at the fire.flow location, but by the minimum pressure being reached at a second node, typically located at a higher elevation. In this case, the system capacity was increased to meet pressure requirements at the controlling node. Areas with a current fire flow deficiency are described below: o The northern portion of the West 256 pressure zone. The central pipelines serving this area have been identified for upgrading and are included in the Capital Improvement Plan (CIP) under "Distribution Improvements." . A portion of the East 490 pressure zone surrounding Reservoirs 12 and 13. . A portion ofthe East 490 pressure zone surrounding Reservoirs 17 and 20. . Southwest Bremerton near the airport in the West 517 pressure zone. The .transmission line that serves the majority of the area will be increased as this area develops to allow for the passage of water at fire flow rates. This line is effectively a dead-end line. After the 2006 fife flow requirements were met by. implementing the pipe improvements, the 2024 MDD was applied to the model, and new fire flow simulations were run to see if any additional upgrades were necessary. It was found that since the increase in demand from 2005 to 2024 is small compared to thel,OOOgpin fire flow demand, only a few additional upgrades were necessary. All proposed improvements are included in the CIPunder "Distribution Improvements. " With the identified improvements in place, the fire flow simulations indicated a number of nodes could not meet the minimum requirements. All of these nodes are located in the Boosted West 256 Zone (Lafayette Zone) served by Booster Station 3, which consists of one 300 gpm pump. System Analysis 8-13 2005 City of Bremerton Water System Plan A number of other nodes did not meet the minimum fire flow requirements for different reasons. Six nodes spread throughout the system were unable to meet the 1,000 gpm demand, because they were located on "dead end" pipes. This means that the pipe ended on the node and did not loop back into the distribution system. The available fire flow at each of these nodes is close to the required 1,000 gpm and could be considered adequate. The pipe improvements are included in the CIP table for the sake of completeness. Each of these improvements should be evaluated on a case-by-case basis. 8.4 Storage Analysis DOH requires public water systems to provide sufficient storage to meet any seasonal or diurnal variations in demand, fire flows, and emergency demands, such as during power outages and equipment failures. These criteria are outlined in the Washington Water System Design Manual (Design Manual), 1999. This plan utilizes these guidelines as criteria for determination of reasonable treated water storage required in each pressure zone. For a given reservoir design, each of the five storage components listed below must be considered: . Operational Storage . Equalizing Storage . Standby Emergency Storage . Fire Suppression Storage . Dead Storage, if any Only effective storage may be used in determining actual available or design storage volume. Effective volume is equal to the total volume minus the dead storage built into the reservoir (and in Bremerton's case, any unusable storage in the top of Reservoir 6). Total storage volume required has been interpreted as the sum of Equalizing Storage, Fire Storage, and Standby (Emergency) Storage at an elevation sufficient to provide 20 psi (static) to the highest customer in any pressure zone. In addition, equalizing storage is evaluated with respect to providing 30 psi (static) to the highest customer in a pressure zone. Operational storage is any surplus storage that is available after subtracting the other required storage components (Exhibit 8-1 in the Design Manual). For this plan, storage requirements will be developed by pressure zone. The ability to provide water from reservoirs to lower zones through PR V stations will be included in the analysis. While DOH will accept nesting of standby and fire flow storage, the Fire Districts served by the Bremerton water system prefer the more conservative approach of including both portions of overall storage separately. 8.4.1 Operational Storage Operational storage is the volume of the reservoir devoted to supplying the water system while, under normal operating conditions, the sources of supply are in "off' status. Operational storage is additive to the other components of storage and provides an System Analysis 8-14 2005 City of Bremerton Water System Plan additional factor of safety. The volume of operational storage should be sufficient to prevent excess pump cycling. The amount of operational storage in each pressure zone is identified as the surplus amount in each calculation. 8.4.2 Equalizing Storage Equalizing storage capacity is utilized to meet the daily (diurnal) variations in demand. Peak use periods typically occur during the morning and evening hours, especially during the breakfast and dinner hours. Water is typically withdrawn from storage during these peak demand periods and replenished during low demand periods in late evening and early morning hours. For systems like Bremerton that supply water to storage based upon the reservoir water levels (on-calI-demand), DOH guidelines specify that the following equation be used to estimate equalizing storage: Equalizing Storage (gal) = (PHD ~ Qs) (150 minutes), where: PHD Peak hourly Demand (gpm) Qs Source production rate (gpm) In most cases in Bremerton, Qs is greater than the PHD resulting in a negative value for Equalizing Storage. In these cases, a value of 15 percent of the Maximum Day Demand is used. At no time is equalizing storage calculated as less than 15 percent ofMDD. 8.4.3 Standby Emergency Storage The purpose of standby storage is to provide a measure of reliability should sources fail or when unusual conditions impose higher demands than anticipated. The volume of emergency storage required is dependent upon the reliability of the source of supply and the ability to provide an alternative supply. If the system or zone has multiple sources of supply, placing the larger supply source out of service and calculating the volume of water that could be provided by the remaining supply sources in gallons per connection per day can reduce the standby storage requirement. For this analysis, the largest source in any pressure zone is taken out of production before the storage volume is calculated. Booster pump stations in a pressure zone are considered a source in this analysis. For pump stations, the capacity of the largest single pump is removed from the total source duringthis calCulation, not the full pump station capacity. The recommended standby storage should not be less than 200 gallons per equivalent residential units (ERU). For systems with multiple sources, the standby storage is based on the following equation: System Analysis 8-15 2005 City of Bremerton Water System Plan Standby Storage (gal) = (2* ADD) (N) - tm (Qs- Qd, where: ADD Average Day Demand/ERU (gpd/ERU) N NumberofERUs Qs Sum of all installed and available sources of supply in gpm QL The largest capacity source available to the system in gpm tm Time that remaining sources are pumped on the day the largest source is not available in minutes (assumed as 24 hours) The larger of the amount calculated in the equation above, or 200 gallons per ERU, is used for Standby Emergency Storage in this analysis. 8.4.4 Fire Suppression Storage Water systems are required to construct and maintain facilities capable of delivering fire flows in accordance with the determination of the fire flow requirements made by the local . fire protection authority while maintaining 20 psi pressure throughout the. distribution system. Fireflow requirements are listed in Section 7.3 and range from 1,000 gpm for 2 hours (120,000 gallons) to 5,000 gpm for 4 hours (1,200,000 gallons), depending on the pressure zone. The magnitude of the fire suppression storage is the product of the maximum flow rate and duration established by the fire protection authority having jurisdiction. The minimum fire suppression storage for systems is the product of the required flow rate multiplied by the flow duration and is based on the following equation: Fire suppression storage (gal) = FF (tm), where: FF = required fire flow rate tm = Duration ofFF rate 8.4.5 Dead Storage Dead storage is the volume of stored water not available to all customers at the minimum design pressures and is excluded from the volumes provided to meet the effective storage. Dead storage is assumed as that volume which is at an elevation lower than the elevation necessary to provide 20 psi (static) atthe meter of the highest customer in any pressure zone. Dead storage has been removed from the total available volume from each reservoir in the tables that follow. System Analysis 8-16 2005 City of Bremerton Water Syste," Plan Table 8.5 Evaluation of Storage Adequacy for Bremerton Water System Western Pressure Zones (West 256, West 440, and West 650) Year 2005 2011 2024 Max ERU Projected ERUs and Demand (1) Equivalent Residential Units (ERUs) 26,147 29,066 39,864 32,284 Average Day 5,292,962 6,122,705 7,969,554 6,454,090 Peak Day 10,585,923 12,238,719 15,945,800 12,913,599 Peak Hour 18,419,507 21,295,371 27,745,692 22,469,662 Available Source (gpd) (2) Surface Supply (12500 gpm) 18,000,000 18,000,000 18,000,000 18,000,000 PIS 2/Anderson Creek Wells (4000 gpm) 5,760,000 5,760,000 5,760,000 5,760,000 Well #17 (735 gpm) 1,058,400 1,058,400 1,058,400 1,058,400 Well #20 (1150 gpm) 1,656,000 1,656,000 1,656,000 1,656,000 Total AvaililbleSource (gpd) 26,474,400 26,474,400 26,4 74,400 26,4 74,400 lRequired Storage Calculations Multi-Source Credit with Existing Source (gpd) (3) 8,4 74,400 8,4 74,400 8,474,400 8,4 74,400 Standby Storage (gal)(4) 5,229,393 5,813,157 7,972,900 6,456,799 Equalizing Storage (gal)(5) 1,587,888 1,835,808 2,391,870 1,937,040 Fire Flow Storage (gal)(6) 960,000 960,000 960,000 960,000 Required Storage Greater than 30 psi at highest meter (gal) (7) 1,587,888 1,835,808 2,391,870 1,937,040 Greater than 20 psi at highest meter (gal) (8) 7,777,281 8,608,965 11,324,770 9,353,839 System Analysis 8-17 2005 City of Bremerton Water Systelll Plan Existing Storage Greater Than 30 psi (gal) (9) Reservoir #4 (255.9') 0 0 0 0 Reservoir #5A (241.9) 0 0 0 0 Reservoir #5B (241.9') 0 0 0 0 Reservoir #21 (255.4') 0 0 0 0 Reservoir #6 (447.2') 48,543 48,543 48,543 48,543 Reservoir #8 (441.0') 1,031,804 1,03 I ,804 1,031,804 1,031,804 Reservoir #23 (652.3') 1,040,937 1,040,937 1,040,937 1,040,937 Total Existing Storage (l1al) 2,121,284 2,121,284 2,121,284 2,121,284 Storage surplusi(Deficiencv) 533,396 285,477 (270.586) 184,245 Existing Storage Greater Than 20 psi (gal) (9) Reservoir #4 (255.9') 5,378,122 5,378,122 5,378,122 5,378,122 Reservoir #5A (241.9) 45,160 45,160 45,160 45,160 Reservoir #5B (241.9') 45,160 45,160 45.160 45,160 Reservoir #21 (255.4') 755,329 755,329 755,329 755,329 Reservoir #6 (447.2') 167,840 167,840 167,840 167,840 Reservoir #8 (441.0') 1,921,291 1,921,291 1,921,291 1,921,291 Reservoir #23 (652.3') 1,040,937 1,040,937 1,040,937 1,040,937 Total Existing Storage (gal) 9,353,839 9,353,839 9,353,839 9,353,839 Storage Surplus/(Deficiencv) 1,576,558 744,874 (\ ,970,931 ) 0 Table 8.5 Continued I. Demand forecasts are based on percentage of total demand listed in Table 2-4. ERUs are based on 400 gpdlERU MDD. Total demand for all pressure zones listed in title are included. 2. Available source assumes source pumps are on for 24 hours in a day, at the maximum production rate. Pump capacities are taken from the City of Breinelton Water Plan. 3. Multi-source credit assumes largest source is out of service. 4. Required standby storage for existing source = greater of (peak day demand - multi source credit) or 200 gallons per ERU. 5. Required equalization storage = greater of 15% of peak day demand or DOH equation: DOH equation = 150 min. * (PHD - Total available source). 6. Required fire flow storage = flow * duration (4,000 gpm for 4 hours). 7. Total required storage greater than 30 psi is equal to the required equalizing storage. 8. Total required storage greater than 20 psi is equal to the required equalizing storage plus fire flow storage and standby storage. 9. Available storage is adjusted for minimum pressures by pressure zone. System Analysis 8-18 2005 City of Bremerton Water Systelll Plan Year 2005 2011 2024 Max ERU Projected ERUs and Demand (I) Equivalent Residential Units (ERUs) 2,720 3,024 4,147 4,343 Average Day 550,60 I 636,915 829,034 868,198 Peak Day 1,101,202 1,273,134 1,658,764 1,737,125 . Peak Hour 1,916,092 2,215,254 2,886,249 3,022,597 Available Source (gpd) (2) Pumping Station #4 (1500 gpm) 2,160,000 2,160,000 2,160,000 2,160,000 Pumping Station # 17 (1500 gpm) 2,160,000 2,160,000 2,160,000 2,160,000 Total Available Source (gpd) 4,320,000 4,320,000 4,320,000 4,320,000 Required Storage Calculations Multi-Source Credit with Existing Source (gpd) (3) 3,600,000 3,600,000 3,600,000 3,600,000 Standby Storage (gal)(4) 543,988 604,714 829,382 868,562 Equalizing Storage (gal)(5) 165,180 190,970 248,815 260,569 Fire Flow Storage (gal)(6) 960,000 960,000 960,000 960,000 Required Storage Greater than 30 psi at highest meter (gal) (7) 165,180 190,970 248,815 260,569 Greater than 20 psi at highest meter (gal) (8) 1,669,169 1,755,685 2,038,197 2,089,131 Existing Storage Greater Than 30 psi (gal) (9) Reservoir #6 (447.2') 48,543 48,543 48,543 48,543 Reservoir #8 (441.0') 1,031,804 1,03 I ,804 1,031,804 1,03 I ,804 Total Existing Storage (gal) 1,080,347 1,080,347 1,080,347 1,080,347 Storal~e Surnlus/(Deficiencv) 915,167 889,377 831,533 819,778 Table 8-6 Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone West 440 System Analysis 8-19 2005 City of Bremerton Water System Plan . Existing Storage Greater Than 20 psi (gal) (9) Reservoir #6 (447.2') 167,840 167,840 167,840 167,840 Reservoir #8 (441.0') 1,921,291 1,921,291 1,921,291 1,921,291 Total Existing Storage (gal) 2,089,131 2,089,131 2,089,131 2,089,131 Storal~e Sumlus/(Deficiency) 419,963 333,447 50,935 0 Table 8.6 Continued 1. Demand forecasts are based on percentage of total demand listed in Table 2-4. ERUs are based on 400 gpd/ERU MOD. Total demand for all pressure zones listed in title arc included. 2. Available source assumes source pumps are on for 24 hours in a day at the maximum production rate. Pump capacities are taken from the City of Bremerton Water Plan. 3. Multi-source credit assumes largest source is out of service. 4. Required standby storage for existing source = greater of (peak day demand - multi source credit) or 200 gallons per ERU. 5. Required equalization storage = greater of 15% of peak day demand or DOH equation: DOH equation = 150 min. * (PHD - Total available source). 6. Required tire flow storage = flow * duration (4,000 gpm for 4 hours). 7. Total required storage greater than 30 psi is equal to the required equalizing storage. 8. Total required storage greater than 20 psi is equal to the required equalizing storage plus fire flow storage and standby storage. 9. Available storage is adjusted for minimum pressures by pressure zone. System Analysis 8-20 2005 City of Bremerton Water SystelIl Plan Year 200S 2011 2024 Max ERU Projected ERUs and Demand (1) Equivalent Residential Units (ERUs) 26,116 29,032 39,818 30,749 Average Day 5,286,757 6,115,528 7,960,2]2 6,147,277 Peak Day ] 0,573,515 ] 2,224,3 73 15,927,108 12,299,715 Peak Hour 18,397,916 21,270,409 27,713,169 21,40] ,504 A vailable Source (gpd) (2) Surface Supply (12500 gpm) ] 8,000,000 18,000,000 18,000,000 18,000,000 PIS 2/Anderson Creek Wells (4000 gpm) 5,760,000 5,760,000 5,760,000 5,760,000 Well #17 (735 gpm) 1,058,400 1,058,400 1,058,400 1,058,400 Well #20 (1150 gpm) ] ,656,000 1,656,000 1,656,000 1,656,000 Total Available Sourc~ (!!od) 26,474,400 26,4 74,400 26,4 74,400 26,474,400 Required Storage Calculations Multi-Source Credit with Existing Source (gpd) (3) 8,4 74,400 8,4 74,400 8,474,400 8,474,400 Standby Storage (gal)(4) 5,223,263 5,806,343 7,963,554 6,149,858 Equalizing Storage (gal)(5) 1,586,027 1,833,656 2,389,066 1,844,957 Fire Flow Storage (gal)(6) 960,000 960,000 960,000 960,000 Required Storage Greater than 30 psi at highest meter (gal) (7) 1,586,027 1,833,656 2,389,066 1,844,957 Greater than 20 psi at highest meter (gal) (8) 7,769,290 8,599,999 11,3] 2,620 8,954,8] 5 Table 8-7 Evaluation of Storage Adequacy for Bremerton Water System Pressure Zones West 256 and West 440 System Analysis 8-21 2005 City of Bremerton Water Systelll Plan Existing Storage Greater Than 30 psi (gal) (9) Reservoir #4 (255.9') 0 0 0 0 Reservoir#5A (241.9) 0 0 0 0 Reservoir #58 (241.9') 0 0 0 0 Reservoir #21 (255.4') 0 0 0 0 Reservoir #6 (447.2') 167,840 167,840 167,840 167,840 Reservoir #8 (441.0') 2,563,204 2,563,204 2,563,204 2,563,204 Total Existing Storage (gal) 2,731,044 2,731,044 2,731,044 2,731,044 Storage Surplus/(Deficiency) 1,145,017 897,388 341,978 886,087 Existing Storage Greater Than 20 psi (gal) (9) Reservoir #4 (255.9') 5,378,122 5,3 78, 122 5,378,122 5,378,122 Reservoir #5A (241.9) 45,160 45,160 45,160 45,160 Reservoir #58 (241.9') 45,160 45,160 45,160 45,160 Reservoir #21 (255.4') 755,329 755,329 755,329 755,329 Reservoir #6 (447.2') 167,840 167,840 167,840 167,840 Reservoir #8 (441.0') 2,563,204 2,563,204 2,563,204 2,563,204 Total Existing Storage (gal) 8,954,815 8,954,815 8,954,815 8,954,815 Storage Surplus/(Deficiency) 1,185,525 354,816 (2.357.806) 0 Table 8-7 Continued I. Demand forecasts are based on percentage of total demand listed in Table 2-4. ERUs are based on 400 gpdlERU MOD. Total demand for all pressure zones listed in title are included. 2. Available source assumes source pumps are on for 24 hours in a day at the maximum production rate. Pump Capacities are taken ITom the City of 8remerton Water Plan. 3. Multi-source credit assumes largest source is out of service. 4. Re{juired standby storage for existing sow'ce = greater of (peak day demand - multi source credit) or 200 gallons per ERU. 5. Required equalization storage = greater of 15% of peak day demand or DOH e{juation: DOH e{juation = 150 min. * (PHD - Total available source). 6. Re{juired fire flow storage = flow * duration (4,000 gpm for 4 hours). 7. Total re{juired storage greater than 30 psi is equal to the re{juired equalizing storage. 8. Total re{juired storage greater than 20 psi is equal to the required equalizing storage plus fire flow storage and standby storage. 9. Available storage assurnes the full amount of storage is available in the upper pressure zone. System Analysis 8-22 2005 City of Bremerton Water Systelll Plan Table 8-8 Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone West 650 (Reservoir 23) Year 2005 2011 2024 Max ERU Projected ERUs and Demand (1) Equivalent Residential Units (ERUs) 125 488 1,275 526 Average Day 24,640 324,438 974,000 40 I ,484 Peak Day 49,280 648,876 1,948,000 802,969 Peak Hour 85,747 1,129,044 3,389,520 1,397,166 A vailableSource (gpd) (2) Pump Station 8 - 2 pumps (1750 gpm) 2,520,000 2,520,000 2,520,000 2,520,000 Total Available Source (god) 2,520,000 2,520,000 2,520,000 2,520,000 Required Storage Calculations Multi-Source Credit with Existing Source (gpd) (3) 1,188,000 1,188,000 1,188,000 1,188,000 Standby Storage (gal)(4) 25,000 97,632 760,000 105,111 Equalizing Storage (gal)(5) 7,392 97,331 292,200 120,445 Fire Flow Storage (gal)(6) 540,000 540,000 540,000 540,000 Required Storage Greater than 30 psi at highest meter (gal) (7) 7,392 97,3 3 I 292,200 120,445 Greater than 20 llsi at highest meter (gal) (8) 572,392 734,963 1,592,200 765,557 Existing Storage G.'eater Than 30 psi (gal) (9) Reservoir #23 (652') 1,040,937 1,040,937 1,040,937 1,040,937 Total Existing Storage (gal) 1,040,937 1,040,937 1,040,937 1,040,937 Storal!e Sumlus/(Deticiencv) 1,033,545 943,606 748,737 920,492 System Analysis 8-23 2005 City of Bremerton Water System Plan Existing Storage Greater Than 20 psi (gal) (9) Reservoir #23 (652') 1,040,937 1,040,937 1,040,937 1,040,937 Total Existing Storage (gal) 1,040,937 1,040,937 1,040,937 1,040,937 Storage Surplus/(Deticiency) 468,545 305,974 (551,263 ) 275,381 Table 8-8 Continued I. Demand forecasts are based on percentage oftolal demand listed in Table 2-4. ERUs are based on the following: ] 25 residential current plus 50 industrial, 2024 1,125 residential plus 150 industrial. ERU and demand totals for 20 I I based on straight line interpolation between 2005 - 2024. 2. Available source assumes source pumps are on for 24 hours in a day at the maximum production rate. Pump capacities are taken ti'om the City of Bremelion Water Plan 3. Multi-source credit assumes largest source is out of service. 4. Requiredstandbystorage for existing source = greater of (peak day demand - multi source credit) or 200 gallons per ERU. 5. Required equalization storage = greater of 15% of peak day demand or DOH equation: DOH equation = 150 min. · (PHD - Total available source). 6. Required tire flow storage = flow · duration (1,500 gpm for 2 hours). 7. Total required storage greater than 30 psi is equal to the required equalizing storage. 8. Total required storage greater than 20 psi is equal to the required equalizing storage plus tire flow storage and standby storage. 9. Available storage is adjusted for minimum pressures by pressure zone. 9. Available storage includes all storage within the system and is not adjusted for minimum pressures. System Analysis 8-24 2005 City of Bremerton Water Systelll Plan Year 2005 2011 2024 Max ERU Projected ERUs and Demand (1) Equivalent Residential Units (ERUs) 1,894 2,106 2,888 4,017 Average Day 383,427 443,535 577,322 802,978 Peak Day 766,854 886,584 1,155,129 1,606,63 I Peak Hour 1,334,326 1,542,657 2,009,924 2,795,537 . Available Source (gpd) (2) Pump Station #12 (950 gpm) 1,368,000 1,368,000 1,368,000 1,368,000 Pump Station #13 (1000 gpm) 1,440,000 1,440,000 1,440,000 1,440,000 Total Available Source (gpd) 2,808,000 2,808,000 2,808,000 2,808,000 Required Storage Calculations Multi-Source Credit with Existing Source (gpd) (3) 1,728,000 1,728,000 1,728,000 1,728,000 Standby Storage (gal)(4) 378,822 421,111 577,564 803,315 Equalizing Storage (gal)(5) 115,028 132,988 173,269 240,995 Fire Flow Storage (gal)(6) 960,000 960,000 960,000 960,000 Required Storage Greater than 30 psi at highest meter (gal) (7) 115,028 132,988 173,269 240,995 Greater than 20 psi at highest meter (gal) (8) 1,453,850 1,514,098 1,710,834 2,004,310 Existing Storage Greater Than 30 psi (gal) (9) Reservoir #15 (489.5') 1,002,155 1,002,155 1,002,155 1,002,155 Reservoir #18 (489.4') 1,002,155 1,002,155 1,002,155 1,002,155 Total Existing Storage (gal) 2,004,310 2,004,310 2,004,310 2,004,310 Storage Sumlus/(Deficiencv) 1,889,282 1,871,322 1,831,041 1,763,315 Table 8-9 Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone East 490 System Analysis 8-25 2005 City of Bremerton Water Systelll Plan Existirng Storage .Greater Than 20 psi (gal) (9) Reservoir #15 (489.5') 1,002,155 1,002,155 1,002,155 1,002,155 Reservoir #18 (489.4') 1,002,155 1,002,155 1,002,155 1,002,155 Total Existing Storal!e (I!al) 2,004,310 2,004,310 2,004,310 2,004,310 Storage: Surplus/(Deficiencv) 550,460 490,212 293,476 0 Table 8-9 Continued I. Demand forecasts are based on percentage of total demand listed in Table 2-4. ERUs are based on 400 gpdlERU MOD. Total demand for all pressure zones listed in title are included. 2. Available source assumes source pumps are on for 24 hours in a day at the maximum production rate. Pump Capacities are taken from the City of Bremerton Water Plan. 3. Multi-source credit assumes largest source is out of service. 4. Required standby storage for existing source = greater of (peak day demand - multi source credit) or 200 gallons per ERU. 5. Required equalization storage = greater of 15% of peak day demand or DOH equation: DOH equation = 150 min. * (PHD - Total available source). 6. Required fire flow storage = flow * duration (4,000 gpm for 4 hours). 7. Total required storage greater than 30 psi is equal to the required equalizing storage. 8. Total required storage greater than 20 psi is equal to the required equalizing storage plus fire flow storage and standby storage. 9. Available storage is adjusted for minimum pressures by pressure zone. System Analysis 8-26 2005 City of Bremerton Water Systelll Plan Ycar , 2005 2011 2024 Max ERU Projected ERUs and Demand (I) Equivalent Residential Units (ERUs) 7,659 8,515 11,678 13,356 Average Day 1,550,517 1,793,582 2,334,597 2,669,984 Peak Day 3,101,034 3,585,204 4,671,154 5,342,210 Peak Hour 5,395,800 6,238,254 8,127,807 9,295,446 Available Source (gpd) (2) Well #9 (270 gpm) 388,800 388,800 388,800 388,800 Well #13 (510 gpm) 734,400 734,400 734,400 734,400 Pump Station #11 (1400 gpm) 2,016,000 2,016,000 2,016,000 2,016,000 Pump Station #14 (600 gpm) 864,000 864,000 864,000 864,000 Pump Station #]6 (1250 gpm) 1,800,000 1,800,000 1,800,000 1,800,000 Total Available Source (gpd) . 5,803,200 5,803,200 5,803,200 5,803,200 , Required Storage Calculations Multi-Source Credit with Existing Source (gpd) (3) 4,795,200 4,795,200 4,795,200 4,795,200 Standby Storage (gal)(4) 1,531,895 1,702,903 2,335,577 2,671,105 Equalizing Storage (gal)(5) 465,155 537,781 700,673 80 I ,332 Fire Flow Storage (gal)(6) 1,200,000 1,200,000 1,200,000 1,200,000 Required Storage Greater than 30 psi at highest meter (gal) (7) 465,155 537,781 700,673 80 I ,332 Greater than 20 psi at hi2:hest meter (gal) (8) 3,197,051 3,440,684 4,236,250 4,672,437 Table 8-10 Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone East 398 System Analysis 8-27 2005 City of Bremerton Water Systell' Plan Existing Storage GreaterThan 30 psi (gal) (9) Reservoir #12 (397.0') 635,897 635,897 635,897 635,897 Reservoir #13 (398.0') 338,930 338,930 338,930 338,930 Reservoir # 17 (398.1 ') 311,186 311,186 311,186 311,186 Reservoir #20 (398.1 ') 311,186 311,186 311,186 311,186 Total Existing Storal!e(l!al) 1,597,199 1,597,199 1,597,199 1,597,199 Storage Surplus/(Deficiencv) 1,132,044 1,059,418 896,526 795,867 Existing Storage GreaterThan 20 psi (gal) (9) Reservoir #12 (397.0') 2,000,000 2,000,000 2,000,000 2,000,000 Reservoir # 13 (398.0') 763,721 763,721 763,721 763,721 Reservoir #17 (398.1 ') 954,358 954,358 954,358 954,358 Reservoir #20 (398.1 ') 954,358 954,358 954,358 954,358 Total Existing Storal!e(gal) 4,672,437 4,672,437 4,672,437 4,672,437 Storage Surolus/(Deficiencv) 1,475,386 1,23"1,753 436,187 0 Table 8-10 Continued I. Demand forecasts are based on percentage of total demand listed in Table 2-4. ERUs are based on 400 gpd/ERU MDD. Total demand for all pressure zones listed in title are included. 2. Availabk source assumes source pumps are on for 24 hours in a day at the maximum production rate. Pump capacitiesaretaken from the City of Bremerton Water Plan. 3. Multi-source credit assumes largest source is out of service. 4. Required 'standby storage for existing source = greater of (peak day demand - multi source credit) or 200 gallons per ERU. 5. Required equalization storage = greater of 15% of peak day demand or DOH equation: DOH equation = 150 min. * (PHD - Total available source). 6. Required fire flow storage = flow * duration (5,000 gpm for 4 hours). 7. Total required storage greater than 30 psi is equal to the required equalizing storage. 8. Total required storage greater than 20 psi is equal to the required equalizing storage plus fire flow storage and standby storage. 9. Available storage is adjusted for minimum pressures by pressure zone. System Analysis 8-28 2005 City of Bremerton Water Systelll Plan Table 8-11 Evaluation of Storage Adequacy for Bremerton Water System East Pressure Zones (East 240, East 398, and East 490) Year . 2005 2011 2024 Max ERU . Projected ERUs and Demand (1) Equivalent Residential Units (ERUs) 12,928 14,371 19,711 21,849 Average Day 2,617,038 3,027,295 3,940,446 4,367,988 Peak Day 5,234,077 6,051,281 7,884,200 8,739,643 . Peak Hour 9,107,293 10,529,229 13,718,508 15,206,979 Available Source (gpd) (2) W256 VIA Gravity Main (1,000 gpm) 1,440,000 1,440,000 1,440,000 1,440,000 Well #9 (270 gpm) 331,200 331,200 331,200 331,200 Well #13 (510 gpm) 792,000 792,000 792,000 792,000 Well 14 (180 gpm) 259,200 259,200 259,200 259,200 Total Available Source{gpd) 2,822,400 2,822,400 2,822,400 2,822,400 Required Storage Calculations Multi-Source Credit with Existing Source (gpd) (3) 1,382,400 1,382,400 1,382,400 1,382,400 Standby Storage (gal)(4) 3,85 J ,677 4,672,189 6,498,492 7,353,576 Equalizing Storage (gal)(5) 785,112 907,692 1,182,630 1,310,946 Fire Flow Storage (gal)(6) 1,200,000 1,200,000 1,200,000 1,200,000 Required Storage Greater than 30 psi at highest meter (gal) (7) 785,112 907,692 1,182,630 1,310,946 Greater than 20 psi at highest meter (gal) (8) 5,836,788 6,779,881 8,881,122 9,864,522 Existing Storage Greater Than 30 psi (gal) (9) Reservoir #1 1 (239.8') 0 0 0 0 Reservoir #16 (238.9') 0 0 0 0 Reservoir #19 (239.1') 0 0 0 0 System Analysis 8-29 2005 City of Bremerton Water Systelll Plan Reservoir #] 5 (489.5') ] ,002,] 55 1,002,155 ] ,002, 155 1,002,155 Reservoir #]8 (489.4') 1,002,] 55 ] ,002,] 55 ] ,002, 155 1,002,155 Reservoir #] 2 (397.0') 2,000,000 2,000,000 2,000,000 2,000,000 Reservoir # 13 (398.0') 763,721 763,721 763,721 763,721 Reservoir #] 7 (398.1 ') 954,358 954,358 954,358 954,358 Reservoir #20 (398.] ') 954,358 954,358 954,358 954,358 Tota] Existing Storage (gal) 6,676,746 6,676,746 6,676,746 6,676,746 Storage Surp]us/(Deficiencv) 5,891,635 5,769,054 5,494,] ] 6 5,365,800 Existing Storage Greater Than 20 psi (gal) (9) Reservoir # 11 (239.8') ] ,579,776 1,579,776 1,579,776 ] ,579,776 Reservoir #] 6 (238.9') 78] ,839 78] ,839 781,839 781,839 Reservoir #19 (239.1 ') 826,] 60 826,160 826,160 826,160 Reservoir #]5 (489.5') 1,002,] 55 1,002,] 55 1,002,155 1,002, 155 Reservoir #] 8 (489.4') 1,002,155 1,002,155 1,002,155 1,002,155 Reservoir #]2 (397.0') 2,000,000 2,000,000 2,000,000 2,000,000 Reservoir #]3 (398.0') 763,72] 763,72 ] 763,721 763,72 ] Reservoir #17 (398.1 ') 954,358 954,358 954,358 954,358 Reservoir #20 (398.] ') 954,358 954,358 954,358 954,358 Total Existing Storage (gal) 9,864,522 9,864,522 9,864,522 9,864,522 Storage Surplus/(Deficiencv) 4,027,734 8,956,830 8,681,892 0 Table 8-11 Continued I. Demand forecasts are based on percentage of total demand listed in Tab]e 2-4. ERUs are based on 400 gpdlERU MDD. Total demand for all pressure zones listed in title are included. 2. Available source assumes source pumps are on for 24 hours in a day at the maximum production rate. Pump capacities are taken from the City of Bremerton Water Plan. 3. Multi-source credit assumes largest source is out of service. 4. Required standby storage for existing source = greater of (peak day demand - multi source credit) or 200 gallons per ERU. 5. Required equalization storage = greater of 15% of peak day demand or DOH equation: DOH equation = ] 50 min. * (PHO - Tota] avai]able source). 6. Required fire flow storage = flow * duration (5,000 gpm for 4 hours). 7. Total required storage greater than 30 psi is equal to the required equalizing storage. 8. Total required storage greater than 20 psi is equal to the required equalizing storage plus fire flow storage and standby storage. 9. A vailabll: storage is adjusted for minimum pressures by pressure zone. System Analysis 8-30 2005 City of Bremerton Water Syste." Plan Year 2005 2011 2024 Max ERU Projected ERUs and Demand (1) Equivalent Residential Units (ERUs) . 1,990 3,165 10,240 2,416 Average Day 398,000 633,000 2,048,000 483,234 Peak Day 796,000 1,266,000 4,096,000 966,468 Peak Hour . 1,385,040 2,202,840 7,127,040 1,681,654 A vailable Source (gpd) (2) Pumping Station 10 (3640 gpm) 5,241,600 5,241,600 5,241,600 5,241,600 Well #15 Pump (205 gpm) 295,200 295,200 295,200 295,200 Well #18R Pump (375 gpm) 540,000 540,000 540,000 540,000 Well #19 Pump (240 gpm) 345,600 345,600 345,600 345,600 Total Available Source (!!od) 6,422,400 6,422,400 6,422,400 6,422,400 . Required Storage Calculations Multi-Source Credit with Existing Source (gpd) (3) 1,180,800 1,180,800 1,180,800 1,180,800 Standby Storage (gal)(4) 398,000 633,000 2,915,200 483,234 Equalizing Storage (gal)(5) 207,756 330,426 1,069,056 252,248 Fire Flow Storage (gal)(6) 180,000 180,000 180,000 180,000 Required Storage Greater than 30 psi at highest meter (gal) (7) 207,756 330,426 1,069,056 252,248 Greater than 20 psi at hi!!hest meter (!!al) (8) 785,756 1,143,426 4,164,256 915,482 Existing Storage Greater Than 30 psi (gal) (9) Reservoir #10 (515.6') 252,248 252,248 252,248 252,248 Total Existing Storage (gal) 252,248 252,248 252,248 252,248 Stora!!e Surolus/(Deficiencv) 44,492 (78,178) (816,808) 0 Table 8.12 Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone West 517 (Reservoir 10) System Analysis 8-31 2005 City of Bremerton Water Systelll Plan Existing Storage Greater Than 20 psi (gal) (9) Reservoir # I 0 (515.6') 964,814 964,814 964,814 964,814 Total Existing Storage (gal) 964,814 964,814 964,814 964,814 Storage Surplus/(Deficiencv) . 179,058 (178,612) (3.199,442) 49,331 Table 8.12 Continued I. Demand forecasts are based on percentage of total demand listed in Table 2-4. ERUs are based on 400 gpd/ERU MOD. Totaldemand for all pressure zones listed in the title is included. 2. Available source assumes source pumps are on for 24 hours in a day at the maximum production rate. Pump capacities are taken from the City of Bremerton Water Plan. 3. Multi-source credit assumes largest source is out of service. 4. Required standby storage for existing source = greater of (peak day demand - multi source credit) or 200 gallons per ERU. 5. Required equalization storage = greater of 15% of peak day demand or DOH equation: DOH equation = 150 min. * (PHD - Total available source). 6. Required fire flow storage = flow * duration (4,000 gpm for 4 hours). 7. Total required storage greater than 30 psi is equal to the required equalizing storage. 8. Total required storage greater than 20 psi is equal to the required equalizing storage plus fire flow storage and standby storage. 9. Available storage is adjusted for minimum pressures by pressure zone. 10. This analysisinch.ides the gravity portion of the West 517 Zone only and assumes the golf course is irrigating. II. Port of Bremerton Industrial Park is served by a 1,500 gpm fire pump station (Booster Station 10). System Analysis 8-32 2005 City of Bremerton Water System Plan 8.4.6 Bremerton System Evaluation The eight previous tables were prepared to analyze the storage adequacy of the Bremerton system.. The following pressure zones were evaluated as stand-alone features: · Main System West Pressure Zones (West 256, West 440, and West 650) (Table 8-5) · Main System West 440 Zone (Table 8-6) · Main System West 256 and West 440 Zones (Table 8-7) · Main System West 650 Zone (Table 8-8) · Main System East 490 Zone (Table 8-9) · Main System East 398 Zone (Table 8-10) · Main System East Pressure Zones (East 240, East 398, and East 490) (Table 8-11) . West 517 Zone (Table 8-12) The individually listed pressure zones do not currently have the ability to receive water from higher-pressure zones, so no storage located in higher pressure zones can be used in their evaluation. The inclusion of an intertie between the West 650 Zone and the West 440 Zone is being considered. The evaluation of the West 256 Zone includes the storage (and demand) for the West 440 Zone, since water can flow from West 440 into West 256 through a zone intertie (Table 8-7). No increase in storage is available in the upper zone when evaluating the lower zone, even though the entire volume would be available at greater than 30 psi. In a similar manner, the evaluation for the East 240 Zone (Table 8-11) includes the storage and demands for the East 398 and East 490 Zones. For the most part, the storage in Bremerton meets DOH requirements. Table 8-13 summarizes the results of the storage analysis. The combined western zones will be deficient in equalizing and total storage by 2018. In the West 517 pressure zone, the current required amount of equalizing and total storage is met by the existing reservoirs, but the zone becomes deficient by 2007, assuming development takes place as projected. If new development arrives in theW est 517 zone, new storage will be needed. The combination of the West 256 and West 440 Zones will be deficit in total storage (greater than 20 psi) by 2018, showing a deficit of approximately 2.4 MG by 2024. All storage requirements (equalizing greater than 30 psi and equalizing plus fire flow and standby greater than 20 psi) are currently adequate throughout the planning period in the remaining pressure zones, including all the pressure zones in the eastern portion of Bremerton. Four small pressure zones have no storage and are served by booster pump stations. No evaluation of these pressure zones was made. System Analysis 8-33 2005 City of Bremerton Water System Plan The West 580 Zone, to be completed in late 2006, is served by the City of Port Orchard's reservoir and was not included as part of the system evaluation. System Analysis 8-34 2005 City of Bremerton Water Systekll Plan ummary 0 orage va ua Ion Equalizing Storage (greater than 30 psi) Total Storage (greater than 20 psi) Pressure Zone 2005 2011 2024 2005 2011 2024 All West Pressure Zones (West 256, - West 440, and West 650) (Table 8- 5) 533,396 285,4 77 (270,586) 1,576,558 744,874 (1,970,931 ) West 440 (Table 8-6) 915,167 889,377 831,533 419,963 333,447 50,935 West 256 and West 440 (Table 8-7) 1,145,017 897,388 341,978 1,185,525 354,816 (2,357,806) West 650 (Table 8-8) 1,039,076 1,038,785 1,038,134 717,946 716,971 713,788 East 490 (Table 8-9) 1,889,282 1,871,322 1,831,041 550,460 490,212 293,476 East 398 (Table 8-10) 1,132,044 1,059,418 896,526 1,475,386 1,231,753 436,187 All East Pressure Zones (East 240, East 398, and East 490) (Table 8' II) 5,891,635 5,769,054 5,494,116 4,027,734 8,956,830 8,681,892 West 517 (Table 8-12) 44,492 (78,178) (816,808) 179,058 ( 178,(12) (3,199,442) Table 8-13 Bremerton Water System S f St Elf System Analysis 8-35 2005 City of Bremerton Water System Plan 8.4.7 Storage Recommendations Based on the analysis above, new storage for the Bremerton system is needed to meet long-term deficiencies. The sections below describe recommended improvements and options to meet these storage requirements. West 440 Zone The West 440 by itself has adequate equalizing and total storage capacity through the 20- year planning horizon. West 256 Zone The combined West 256 andW est 440 Zone analysis indicates that the two zones currently have adequate storage with a total storage deficit of 2.37 MG by 2024. Construction of a 2.5 MG reservoir will provide adequate storage for the full planning period. Additional storage must be constructed above elevation 241 to eliminate the deficit. This new storage could be installed in either the West 440 or West 256 Zones to be available to mitigate the deficiency. The Reservoir 5 site is a possible location for an additional reservOIr. A potential alternative to construction of new storage in the West 256 Zone is to reclaim some of the dead storage in Reservoir 4 by converting the highest services in the pressure zone to the West 440 Zone. This option will be evaluated by the City prior to pre-design of any reservoir construction projects. West 580 Zone The West 580 Zone is currently under construction to be completed in late 2006. It will be served by the new Pump Station 2a which will be operated from the level in the Port orchard Fiegly Road reservoir. Storage needs will depend on the rate of residential growth. Bremerton currently has plans to construct an additional 1 MG reservoir for this zone in 2015. Combined Western Zones The combined western zones reflect the situation in the various individual zones. The deficit of approximately 2.0 MG by 2024 can be solved by eliminating the storage deficiency in the combined West256 and West 440 Zones. East 240 Zone This zone has no current or projected storage deficiencies. System Analysis 8-36 2005 City of Bremerton Water System Plan East 398 Zone This zone has no current or projected storage deficiencies. East 490 Zone This zone has no current or projected storage deficiencies. West 517 Zone This zone has adequate equalizing and total storage for current conditions, and experiences a deficit in equalizing storage by early 2007 and in total storage shortly thereafter. Since this zone consists primarily of commercial and industrial development, construction of new storage should be completed in stages as development occurs and new storage is needed. Mitigation of the 6-year equalizing and total storage deficit requires construction of a 1.0 MG reservoir with approximately 100,000 gallons above elevation 486. Mitigation of the remaining projected deficit can be completed after 2011 or as development occurs. 8.5 Reference Technical Appendix III Water Supply Plan. South Kitsap County Industrial Area Sub-area Plan. SEMCON, Inc. December 1999. West 580 Pressure Zone Project Approval Report. URS. 2004. System Analysis 8-37 2005 Bremerton Water System Plan Section 9 Capital Improvement Plan 9.1 The Capital Planning Process A number of system improvements have been identified during the completion of this plan. The development of the specific improvements has been described in the appropriate section. This section combines the various improvements identified into a single listing which can be prioritized and scheduled. The City prepares a Capital Facility Plan (CFP) as required by the Washington State Growth Management Act (GMA). This CFP is updated every two years and was last updated in 2004. Kitsap County also prepares a CFP and it will be next updated in 2006. The Water Utility updates its 20-year CIP every six years with the Water System Plan Update. The Utility updates its six-year CIP annually at the beginning of the budget cycle in the second quarter of each year. The GMA requires the improvements identified in the water system planning process be consistent with GMA planning. 9.2 Identification of Recommended System Improvements A listing of improvements to the Bremerton system has been created through the combination of the following: · Existing Bremerton Water Utility Capital Improvement Plan as approved by the City Council for the years 2006 through 2011, · Additional projects identified during the water hydraulic model analysis as performed as part of this plan of Bremerton's source, storage, distribution, transmission, and water quality, · Projects required to meet federal and state regulatory requirements, and · Other projects identified by City personnel for the years beyond the approved CIP for the years 2006 through 2011. These projects have been combined into Table 9-1 showing project name, scheduled year of activity, and estimated project cost. Cost for the pipe construction is based on $12.00 per inch diameter per foot and include all project costs (construction, sales tax, engineering, administration, etc.). Each year, the Utility has allocated an annual amount for main replacement in the CIP which funds both water main work as identified by the hydraulic analysis and substandard main replacement. The list of anticipated distribution improvements is located in the appendices. The Utility has outlined a plan to replace substandard mains, defined as generally being three inches or less in diameter and need to be replaced for improved water service. Additionally, the Utility allocates an annual amount for the following recurring capital expenditures: Capital Improvement Plan 9-1 2005 Bremerton Water System Plan . Miscellaneous minor capital equipment and improvements for the Water Resources Division . Miscellaneous minor capital equipment and improvements for the Utility Operations Division . Meter replacement . New taps and meter installation . Fire hydrant installation There are several major projects projected for the Utility that are not part of the CIP but are funded through operations and maintenance expense such as the water system plans required every six years, other water planning and reports, and reservoir coatings. CIP projects are categorized according to the reason required: . Maintenance . Replacement or upgrade (not growth-related) . Required to meet state and federal regulations . Growth-related upgrade 9.3 CIP Schedule The City has already approved the existing CIP schedule for projects scheduled from 2006 through 2011. Water projects scheduled from 2012 through 2025 have been identified by City personnel, were developed during hydraulic modeling, will be required by regulations, were recommended by studies, or are required to serve growth. The schedule is based on their relative priorities. Those with high priorities are scheduled to be built between 2006 and 2011. Those with lower priorities are scheduled for later years. Funding for the CIP program comes from rates, grants and loans, and revenue from timber harvest on Utility-owned land. On a regular basis the Water Utility conducts a Cost of Service study to determine the revenue needs. An annual amount is allocated for CIP projects. Financial planning is more fully discussed in Section 10. Capital Improvement Plan 9-2 Table 9-1 City of Bremerton Water Utility Twenty Year 2006 - 2025 Capital Improvement Plan ($2006) .. ~ o 0:: 2 4 5 7 8 9 R0241102 10 R6235102 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 400 Annual Substandard Water Replace inferior water mains that are Main Replacement undersized and/or deteriorated 4000 Annual Distribution Main Improvements Annual Mise Capital Improvements Water Resources Division Annual Mise Equipment" Utility Operations Division. 401 402 410 Annual Taps/Meters 496 Annual Meter Replacement 403 Annual Fire Hydrants 4367 Road Maintenance and Abandonment Plan Anderson Creek Wellfield Improvements West 580 Zone Development Ultraviolet Treatment Facility Install new and replacement mains as identified to improve flow. pressure, water ualitv and maintenance Construct minor capital improvements Continuous replacement of miscellaneous equipment Installation of taps and water meters as requested by customers Replace old meters on a periodic basis to insure accurate reading and billings Installation of fire hydrants as requested bv customers Washington State Forest Practices Act requires a road maintenance program in utilitv-owned forests Well construction. redevelopment, and Pump Station 2 upgrade improves water flow into town from this source, and improves flow to East Bremerton during erieds of hinh water demand Last phase of construction of a pump station and transmission main to serve na.... urban development in the W580 zone in the Anderson Creek Area (most of project had outside funding) Federal Enhanced Surface Water Treatment Rule will require Bremerton to install dual disinfection - UV will be used i addition to chlorine 416 Pump Station 4 Upgrade Upgrade Pump Station 4 and install 12" and Transmission Main transmission main to improve flow to the West 440 Zone Water Meters - Extra Large Replacements 3 Water System Security Imnrovements 4307 471 4354 4 5 Watershed Land Purchases 419 4303 Reservoir 15,18,17,19, 20, 5 Seismic Isolation Valves 7 Well 22 Pump and Controls Pressure Re9ulating Valves 8 Warren and Manette Isolation Valves McKenna Falls Weir Modification 10 nstal aton 0 the new meters IS necessary for accurate billing of water and sewer service as existing meters are outdated, accuracy is questionable, and spare parts . , "n.v.il.hl. Construct security improvements identified in the Vulnerabilitv Assessment Replace failing old timber abutment at entrance to watershed to ensure safe entry into source facilities Install new chlorinators, containment, and shut-off valves Recurring $2,100,00 until complete $500,00 per yea 4 $200,000 Recurring $500,000 4 $125,000 Recunring per yea 4 $15,000 4 $100,000 $15,000 Recurring per yea $70,000 Recurring per yea 6 $65,000 $100,000 . $100,000 $20,000 $150,000 Recurring per yea 2 $200,00( $20,000 Recunring per yea 5 $1,200,00C $40,00C $5,000,00C $l,OOO,OOC $300,00C $100,00C $50,00C $50,00 $400,00 $300,00 $300,00C $150,00C $120,00C $100,00C $100,00C $75,00C $75,00C 6 $20,000 Recurring through 2015 $20,000 2004 $400,000 4 2005 6 $40,000 2006 5 $60,000 2006 $400,000 4 2006 $150,000 4 2006 $50,000 4 2006 $50,000 2 2006 4 $50,000 2007 4 2007 4 2007 4 2007 4 2007 4 2007 4 2007 4 2007 4 2007 4 $200,000 $500,000 $100,000 $15,000 $65,000 $20,000 $300,000 $150,000 $50,000 $400,000 $300,000 $300,000 $150,000 $120.000 $50,000 $100,000 $75,000 $75,000 $200,000 $300,000 $500,000 $1,000,000 $100,000 $100,000 $15,000 $65,000 $100,000 $20,000 $20,000 $700,000 $50,000 $15,000 $65,000 $100,000 $20,000 $20,000 $300,000 $500,000 . .... ',' $100,000 $15,000 $65,000 $100,000 $20,000 20,000 $325,000 $325,000 $500,000 $1,000,000 $125,000 $125,000 $15,000 $70,000 $150,000 $20,000 20,000 $2,000,000 $2,000,000 Page lof2 $15,000 $70,000 $150,000 $20,000 20,000 $250,000 $500,000 $125,000 $15,000 $70,000 $150,000 $20,000 20,000 $500,000 $125,000 $15,000 $70,000 $150,000 $20,000 20,000 $500,000 $125,000 $15,000 $70,000 $150,000 $20,000 20,000 $500,000 $125,000 $15,000 $70,000 $150,000 $20,000 $500,000 $125,000 $15,000 $70,000 $150,000 $20,000 $500,000 $125,000 $15,000 $70,000 $150,000 $20,000 '. $500,000 $125,000 $15,000 $70,000 $150,000 $20,000 . 'i.'." ',.,,' 0'. , " .. ""': ,.:' ai :1.~~~: ,";. .....;.;? ....;; .......:..;. $500,000 $125,000 $15,000 $70,000 $150,000 $20,000 $500,000 $125,000 $150,000 ." ""':""1" i':i .{~i >......... .. .";",,.,:,',:' 'ri'S",?,'" ',':'C: c' " _,'; :cj - . "0 ';. ..:.;: . $500,000 $125,000 $15,000 $15,000 McKenna Falls Road Repair Anderson Creek Chlorination Unarades Reservoir 12 Roof Replacement and Seismic Replace roof on Reservoir 12 Upgrade Booster Station 3 Abandonment and Zone Imnrovements Extend reduced W440 Zone to improve flow and pressure Purchase 9 acres on the City's side of McKenna entrance gate and 2 acres on th East side of the watershed to increase seGuritv. Install isolation valves on the stated reservoirs to prevent draining of the reservoirs in case of earthquake or other emeraencv Install pump and controls at Well 22 once water riahts have been finalized Install pressure relief valves at critical areas in the distribution svstem. Install isolation valves adjacent to the Manette and Warren Avenue bridges to revent oice failure on the bridne Sawcut and remove concrete over TM to eliminate ponding downstream of the existing weir for the system intake Purchase a trailer mounted generator to Trailer Mounted Generato provide electrical power to west-side pump stations durina Dower outaaes $70,000 $70,000 $150,000 $20,000 $20,000 $500,000 $125,000 $150,000 '. . $500,000 $500,000 $125,000 $125,000 $15,000 $15,000 $15,000 $70,000 $70,000 $70,000 $150,000 $150,000 $20,000 $20,000 $20,000 2006 - 2025 CI P .. ~ o a: ;,? 'c" ";<',, ; " ,,;', ;. .. .' ;.ii/ ,>, .. ", ';,'}, t, ,/' ,<''".'" it \, , ' ~o,~~~I~l~1 " ;'"d" , ;29~3 ',' ,'; ','; i, {{'f,,: :; , :";~ ,X .:if i;C.i, , ,;"t ;, , Pump Station 17 Install improved MCC and control valve at " 11 MCC/Gorst Control Valve Pump Station 17 $50,00 2007 4 $50,000 , , 12 Heinz Creek Bridge (2000 Replacement of existing partially blocked $50,OO( 2007 4 $50,000 " Rd Culvert' culvert , 13 Reservoir 8 Drain Improve drain from Reservoir 8 to prevent $30,OO( 2007 4 $30,000 , rone"" damane 13th Street, High Stree~ 14 and Ohio Street 12" Construct 12- distribution main in this $880,00( 2008 4 $30,000 $850,000 Distribution Main neighborhood to increase flow and pressur Upgrade Disinfection .. Replace gas containers with alternative 15 System for Union River $550,OO( 2008 4 $50,000 $500,000 SUMI disinfectant as a result of UV installation , Change supply for Gold Mountain Golf Gold Mountain Golf Course to serve the irrigation system from 16 Course Irrigation i the transmissioF:1lT1ain to reduce summer $400,00( 2008 6 $50,000 $350,000 '. demands on adjacent wells and the West 517 Zone Install pump, motor, 700 1.1, piping, power 17 Well 1 R Upgrades and telemetry into new well to bring the we $200,OO( 2008 4 $200,000 on-line 18 Forestry Offices Upgrade Replace obsolete mobile-home office facili $150,OO( 2008 4 $150,000 Manette Bridge Water Provide 12" pipe only for a new water main $75,OO( 19 Main on the Manette Bridge which is scheduled 2008 4 $75,000 to be replaced in 2007 and 2008 R0245101 Casad Dam Early Waming Install an early warning system at Casad $60,OO( 2008 4 $60,000 Svstem Dam in case of emeraencv Construct a new transmission main under 20 C Street from Oyster Bay SR3 to provide redundant conveyance of $2,000,00( 2009 4 $250,000 $1,750,000 to National Ave - 24" pipe water from the source to the West 256 Zone Oyster Bay Remodel & Construction of additional office facilities to 21 Expansion ; consolidate PW&U Staff at oyster Bay $375,OO( 2009 4 $375,000 Location Hardening of Casad Dam A geotechnical study recommended $200,OO( 23 Overflow hardening of the rock face below the 2009 4 $200,000 overflow to nrevent erosion Well pump. motor, and electrical service 24 Well 18 Pump and Motor needs to be upgraded to increase well $75,00 2009 6 $75,000 canac;ru i Twin Lakes Diversion 25 Improvements Construct diversion facility $75,00 2010 4 $75,000 26 Emergency Source Upgrade facilities for emergency water $400,00 2011 5 $40,000 :' $360,000 , Upgrades supply at Gorst Creek and Andersen Cree Construct reservoirs in the pressure zones 27 Storage Improvements to provide additional storage for high $2,500,00 2012 6 $2,500,000 $420,000 demand n<>rlods and fire nrotection West Branch Diversion Increase the pipe size at the West Branch 28 Expansion diversion to maximize water use from this $150,00 2012 4 $150,000 source 29 Unnrade SCADA Uoorade RTUs to PLC svstem $200 00 2013 4 $200,000 Union River Main Stem Will facilitate draining of intake basins for 30 Isolation Sluice Gate and $75,OO( 2013 4 $75,000 Diversion to E Branch maintenance RedrHl a larger well once Ecology makes a 31 Redrill Well 9 decision on the new water rights application $550,OO( 2014 4 $500,000 for 1000 nnm 32 West 517 Zone storaoe Construct storane for SKIA Growth $2 000 00 2015 6 $2,000,000 33 West 580 Zone Reservoir Construct 1 MG Reservoir and transmission $1,300,00 2015 4 $1,300,000 main on Fiegley Road location Port of Bremerton Upgrade transmission main from 8"AC to 34 Transmission Main 18" 01 to proVide more capacity for future $1,000,00 2015 6 $1,000,000 increased demands 35 Property Purchase for To be prepared in the event a new $150,OO( 2016 5 $150,000 Potential Filtration Plant treatment facilitv is renuired 36 Replace McKenna Falls Replace traveling screens $100.00 2016 4 $100,000 Travelinn Screens 37 36" Transmission main Replace undersized and obsolete $6,000,00 2018 4 $2,000,000 $2,000,000 $2,000,000 McKenna Falls to Gorst transmission main TOTAL COST BY YEAR $2,220,000 $3,220,000 $2,635,000 $4,020,000 $4,395,000 $3,765,000 $4,735,000 $1,425,000 $1,400,000 $5,200,000 $1,130,000 $880,000 $2,880,000 $2,880,000 $2,880,000 $880,000 $880,000 $1,300,000 $880,000 $880,000 26 27 28 29 30 31 32 33 34 35 36 37 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 Page 20f2 2006.2025 CIP 2005 City of Bremerton Water System Plan Section 10 Financial Plan 10.1 Introduction The effective implementation of a Water System Plan (WSP) is dependent on accurately developing a plan that can be financially supported by the utility, will meet State and local regulatory requirements, and provides the flexibility to deal with unforeseen changes. This chapter presents a financial plan that reviews the revenues and expenses for the City of Bremerton's (City) water system. The financial plan includes projected operating and capital costs of the system for the six-year time horizon of 2006 to 2011. The revenues and expenses used in the financial plan were obtained from the City's 2005 budget in conjunction with historical consumption information. The capital costs contained within the financial plan utilize the Capital Improvement Plan (Crp), which was developed for the City's water utility rate study, recently updated in 2005. The results of the financial plan outline the annual operating and capital needs of the water system and determine if current water revenues are sufficient to cover costs. This analysis is not intended to be sufficient to provide a detailed review of cost of service or various alternative rate designs; however, the City recently completed a rate study in 2005 independent of this planning document to address those issues. In addition, Bremerton's conservation-oriented rates are being reviewed as part of this project. 10.1.1 Past Financial History The past six years of financial information for the water utility were evaluated to gain an understanding of the past performance of the utility, and at the same time, gain perspective on the current financial status of the water utility. Table 10-1 is a summary of a six-year financial history (2000 to 2005) for the City's water utility. The utility has an adequate financial position. As Table 10-1 illustrates, the utility is showing a positive cash flow for the historical test period. The balances are used for capital improvements and reserved for future capital needs. While some capital improvements are funded through low-interest loans and revenue bonds, resulting in debt service payments, historically the utility has also funded a substantial portion of its capital improvements through rates. Target levels for funding capital improvements for future years are discussed later in this section. Financial Plan 10-1 2005 City of Bremerton Water System Plan Table 10-1 Water System Financial History 2005 2004 2003 2002 2001 2000 Revenue Operating Revenue $6,740 $5,739 $5,093 $4,420 $4,144 $4,054 Other Operating Revenue 1,552 1,649 1,476 1,631 1,104 1,454 Interest and investment 90 59 108 137 262 414 Other Non-operating Revenue 4 310 256 190 200 212 Transfers In 0 0 103 0 0 (24 Total Revenue $10,475 $7,757 $7,036 $6,378 $5,711 $6,11 0 Expenses General Operations $1,373 $],336 $1,180 $989 $923 $975 Maintenance 2,154 ],995 1,691 1,504 1,388 1,528 Customer ServiceIMarketing 282 268 298 266 364 464 General Adminstration 1,053 977 689 623 535 487 Other Operating Expenses 588 673 590 571 519 622 TotalO&M $5,451 $5,250 $4,448 $3,953 $3,728 $4,076 Taxes and Transfers Property, Excise, and B&O $309 $279 $229 $547 $496 $509 Total Taxes and Transfers $309 $279 $229 $547 $496 $509 Other Expenses Depreciation and Amortization $1,328 $1,557 $1,499 $1,314 $1,222 $1,240 Interest Expense 154 139 68 66 67 70 Total Other Expenses $1,482 $1,696 $1,567 $1,380 $1,290 $1,310 Total Revenue Requirements $7,241 $7,224 $6,244 $5,880 $5,514 $5,895 Balanceillefinciency of Revenue $3,233 $533 $792 $499 $197 $215 Note: All values are shown in $1,000. 10.1.2 Development of the Financial Plan A six-year financial plan was developed to determine the City's ability to meet its capital improvement and operating needs over the six-year review period. In developing the financial plan, fund balance and reserve levels were also analyzed. The financial plan was developed to review the projected revenues and expenses of the water system between 2006 and 2011. The City's 2005 budget was used as a base. Future years were escalated by applying factors for inflation and growth, as described below. 10.1.3 Revenue The first component of the financial plan is a review of the sources of revenue of the water system. The different revenues received from operations are: . Revenues from services - rates, connection fees, timber sales, service repairs, fines and penalties, ancillary fees; . Miscellaneous revenue - interest earnings on fund balance, lease payments; . Other income - General Facility Charges, grants; Financial Plan 10-2 2005 City of Bremerton Water System Plan . Non-revenue receipts -loan proceeds; and . Other financing sources - sale of assets. Projections for future year rate revenues were developed by applying a projected growth rate of one percent to the 2005 budgeted rate revenue. Other miscellaneous revenues, including investment interest, penalties and other revenue, are projected to increase approximately one percent per year through 2011,. Rate revenues are projected to be $7.3 million in 2006. The rate revenues of the City come from retail sales to the residential and commercial customers and Puget Sound Naval Shipyard (PSNS) sales. With growth applied at one percent per year, the rate revenue is estimated to increase to $7.7 million by 2011. Other revenues for 2006 total approximately $460,000, with a majority of the revenue stemming from long-term facilities leases (such as cell towers) and water connection charges. The total amount of other revenue increases over the six years, reaching approximately $485,000 by 2011. The total revenue available to offset the operating and capital requirements of the water system totals $7.8 million in 2006, and is projected to increase to $8.2 million by 2011. 10.1.4 Expenses The projection of future operating expenses, or the application of funds, is based on the 2005 budget. These expenses are projected for future years by applying the escalation factors pertinent to the type of expense being reviewed. The second part of the financial plan is a review of the applications of funds. In developing the financial forecast, four main cost components were reviewed: . Operations and Maintenance (O&M) Expenses . Taxes and Transfer Payments . Debt Service . Capital Improvements Funded from Rates Operation and Maintenance Expenses Using the 2005 budget as a starting point, expenses were escalated by factors representing assumed inflationary rates to obtain projected costs. Escalation factors range from employee benefits (combined with other increasing labor costs) at an estimated annual increase of7.6 percenUo miscellaneous equipment, materials, and supplies at one percent each. Purchased power was calculated at anescalation of three percent per year. Detailed escalation factors are provided at the end of this section. While operating costs increase in some areas for regulatory compliance with IDSE and other monitoring requirements (including approximately $5,000 per year for cryptosporidium in 2007 and 2008) in future years, as noted in Section 4, the Water Resources' professional services budget remains at average annual expenditure levels of Financial Plan 10-3 2005 City of Bremerton Water System Plan $100,000 per year (reducing the 2006 budget level by $165,000). The inflationary escalation factors still show an overall increase in the operation and maintenance budget for future years. IDSE future compliance costs are shown in 2011 at $8,000 per year. Additional operation and maintenance costs for the ultraviolet (UV) water treatment plant were identified in a treatment option evaluation and are projected to begin in 2011, adding $63,000 to operations and maintenance expenses. No other program cost increases above budget year 2006 figures were assumed as part of the projected costs. Operation and maintenance expenses ranged from $6.85 million in 2006 to a projected $8.37 million in 2011. Taxes and Transfer Payments The water system currently has tax obligations to the State in the form of excise taxes. The state public utility tax is calculated as 5.029 percent of the water utility rate revenues. For 2006 these taxes/transfer payments total approximately $1 million through 2011. Projected taxes for the period assume constant tax rates over time. Debt Service According to City financial records, two Public Works Trust Fund (PWTF) and nine Drinking Water State Revolving Fund (DWSRF) loans relate to the water utility. An annual payment of approximately $180,000 for a 1998 PWTF loan for the 36" water main is completed in 2019. The annual payment of approximately $12,000 per year for the 1999 PWTF loan to the Tracyton Water District is estimated for the planning period. The City's nine DWSRF loans are for various projects. The larger loan amounts are for the following projects: East-West Flow Improvements, the Casad Dam Seismic Retrofit, Casad Dam HB Valve, Pump Station 4 Upgrade, and the Tracyton Water District Upgrade. Additional, smaller seismic and retrofit type projects also exist. The DWSRF loans total about $510,000 per year in debt service payments. The final amount is an annual Utility Local Improvement District (UUD) payment of $61,500 per year. This amount is offset by a similar funding revenue level (UUD revenues). The combined debt service on the existing debt averages approximately $770,000 between 2006 and 2011. The model used to develop the financial plan indicates that the City plans to apply for additional loans through 2011 to meet the capital needs identified within this plan. These projected loans add an additional $540,000 of debt payments by 2011, for a total projected debt service of $1.3 million by 2011. Meeting debt service coverage (DSC)requirements is an important financial indicator for well-managed utilities. Debt service coverage is a financial measurement of an entity's ability to repay debt. A DSC ratio is a comparison of net income before debt service payments to the total debt service on revenue bonds or of all outstanding debt service. A DSC ratio of 1.25 or 1.30 is generally considered the legally acceptable minimum for revenue bonds. However, the City has established written financial policies that target a debt service coverage ratio of 1.50 or above. The City meets this requirement every year Financial Plan 10-4 2005 City of Bremerton Water System Plan except in 2011, when additional operating costs for UV treatment are scheduled to begin. The City will need to be watchful of this planning requirement during its financial evaluations. While no revenue bonds require the 1.5 DSC ratio test at the current time, it is an important financial indicator to rating agencies if the City decides to pursue revenue bond funding any time in the future. The City does have outstanding revenue bonds for its wastewater utility for which the DSC coverage ratio is calculated and met on a combined utility basis. Capital Improvement Projects from Rates Capital improvement projects (CIP) are related to the infrastructure of a utility. CIPs are generally divided into two categories: capital improvements related to renewal and replacements of the existing plant (depreciated facilities), and growth-related projects, including system expansion and upgrades to accommodate new customers. The City capitalizes some staff time and benefits for those staff working on capital projects. In addition, planning and construction projects are included within the capital component of the financial plan. The financial analysis conducted for this plan has incorporated the capital projects outlined in the 2005 rate study and modified by Section 9 of this plan. These projects have been allocated by year in order to quantify the annual capital requirements for the planning period. Identified CIP totals range from approximately $1.9 to $4.6 million per year from 2006 to 2011. It is not anticipated that the City will use a large amount of reserve funding to cover its capital improvements. Reserve funds are discussed later in this section. As prudent practice, a utility should fund a portion of its capital improvements from rates on an on-going basis. The City is not expected to have any remaining capital fund balance in 2006; however, an increase in rate-funded capital (from approximately $300,000 in 2006 to $765,000 in 2011) and continued steady timber sales funding (averaging around $1.1 million a year) should not only cover capital improvements, but build a positive balance in the ending capital reserves, reaching $720,000 in 2011. The capital analysis assumes that any additional funding beyond what is necessary to meet the annual capital requirements will be placed into the working capital reserve for future capital needs. 10.1.5 External Sources of Funds for Capital Projects The City has the ability to apply for grant arid loan funds available to public entities for water system projects and has been successful at obtaining a number of low-interest loans, as described earlier under the debt service section. Table 10-2 provides a summary of information for various funding agencies. These sources rarely provide full funding of a construction project. The City needs to supplement any of these funds with matching Financial Plan 10-5 2005 City of Bremerton Water System Plan funds to meet eligibility criteria and to ensure implementation of the recommended capital improvement projects can occur. Table 10-2 Funding Agency Contacts Program Address Phone Fax Internet Centennial Clean Department of Ecology Water Fund P.O. Box 47600 (360) 407-6566 (360) 407-6426 www.ecy.wa.gov Olympia, WA 98504-7600 Drinking Water Department of Health DWSRF State Revolving PO Box 47822 (360) 236-3095 (360) 236-2253 www.doh.wa.gov Fund Olympia, W A 98504-7822 Public Works Public Works Board Trust Fund P.O. Box 48319 (360) 586-7186 (360) 664-3029 www.pwb.wa.gov Olympia, W A 98504-8319 Infrastructure Database (over Infrastructure Assistance (360) 725-5002 www.infrafunding.wa. gov 200 funding Coordinating Council (lACe) programs) A brief description of these funding sources is provided below. DeparlmentofEcorogy The Centennial Clean Water Fund (CCWF) is available to local governments and tribes for measures to prevent and control water pollution. Both grants and loans are available on a yearly funding cycle. CCWF is the largest State grant program for water projects. It provides funding for planning, design, and construction of facilities and other activities related to water quality. The primary focus of the program is pollution prevention and funding projects with a quantifiable water quality benefit. Funds are available to protect a source of water supply, and implement wellhead protection, water conservation, and water reuse projects if they can be shown to be the cost-effective alternative to solving a water quality problem. Funding from this program is not available to provide excess capacity or a source of supply, but must be used to meet existing customer needs. Interest rates are 0.5 percent for loans up to five years, while loans over five years but less than 20 years have a 1.5 percent rate. Grant funding of 50 to 75 percent ofa project can be available, depending on the type of project. Another source of Washington Department of Ecology (Ecology) grant funding provided by the Remedial Action Grant Program is normally used only to mitigate contamination events. Financial Plan 10-6 2005 City of Bremerton Water System Plan Washington Department of Health The SDW A appropriates funding for states to develop their DWSRF loan programs. Each state receives annual allocations in the form of a capitalization grant. In Washington State, the DWSRF is jointly managed by DOH Division of Drinking Water and the Public Works Trust Fund Board (Board), along with its partner, the Department of Community, Trade and Economic Development. DWSRF loans are available to all community public water systems and non-profit, non- community public water systems, except federally-owned and State-owned systems. The loans may be used to address SDW A health standard violations, replace infrastructure for SDW A compliance, or consolidate supplies and acquire property if needed for SDW A compliance. The interest rates on DWSRF loans are 1.5 percent for the basic rate or one percent for an "economically distressed county," as determined by the DWSRF guidelines. They apply a one percent loan fee on all loans. The interest rate can be dependent on the overall economic situation of the area. If 51 percent of the area's households are below 80 percent oftheniedian income for the county, the interest rate drops to 0.5 percent, ahd if the 51 percent are at or below 50 percent of the county median income, the loan has a zero percent interest rate. In this case the loan has a 30-year (or life of the project) period, while all others have a 20-year (or life of the project) period. Public Works Trust Fund The PWTF loan program is set up by the Washington State Legislature to assist cities, towns, counties, or special districts with funding for different types of public works projects. The projects can include streets, roads, drainage systems, water systems, and sanitary sewer systems. The emphasis of allocating funds is for replacement and repair of existing systems. Funds are not allocated to install new water systems but are granted to rehabilitate or replace existing systems serving an existing population. The loans are issued atup totwo percent interest rate for a maximum term of 20 years or the life of the project for applications requesting 95 percent project funding. The interest rate decreases to 0.5 percent when applicants provide at least 15 percent of the project funding. Debt service coverage is not imposed on the PWTF loan. Infrastructure Assistance Coordinating Council Numerous other programs with funding are available for various other aspects of water utility capital projects. The Infrastructure Assistance Coordinating Council (Council) provides resources and conferences on the available funding sources. The Council is comprised of State and local organizations whose function is to provide funding for infrastructure repair and development. The purpose of the Council is to assist local governments in coordinating funding efforts for infrastructure improvements. This is an important resource, as the Council will be aware of any new funding opportunities that may anse. Financial Plan 10-7 2005 City of Bremerton Water System Plan While the above list of possible grant and loan opportumtIes for the City is not exhaustive, it does highlight the most probable outside funding sources, excluding revenue bonds and other external sources of funds, available to the City for its water capital improvement needs. These other external sources of funds are described below. Revenue Bonds Revenue bonds are supported by the income generated from monthly utility charges. The City Council can issue revenue bonds at its discretion. Water rates must be high enough to pay system operation and maintenance costs plus the annual principal and interest cost (debt service) of the bond issue. F or investors to buy revenue bonds, rates must include adequate revenue to provide for "coverage." The normal coverage is 20 to 30 percent of the debt service, depending on the financial strength of the City. Utility Local Improvement Districts Projects benefiting a specific area of adjacent properties can be funded through utility local improvement districts (UUD). After a UUD is formed, the cost of the project can be assessed against the benefited properties in proportion to its share of the total benefits. The amount of the assessment cannot exceed the increase in the value of the property resulting from the project. A UUD combines property assessments and revenue funding from water rates. The additional security of the bonds tends to bring lower interest rates. Flexibility and equity are also gained, as the City can accommodate the cost of special construction problems or upsizing the distribution system. Developer Extensions Under a developer water main extension, the owner of a development requests water service. Filing fees usually cover administration costs only. The developer pays all costs of the extension and turns the facilities over to the City for operation and maintenance. 10.1.6 Internal Sources of Funding for Capital Projects Internal funding sources available to offset capital costs include contributions received from new water customers for their capacity impact on the system. The City updated its water general facility charges (system development charges) in 2004. The 2006 charge for a 5/8" x 3/4" meter connection is $2,369. . The charges increase by meter size, as the capacity of the meter increases. These charges are adjusted annually to keep up with the Construction Cost Index. The City should also conduct a comprehensive update of these fees every 3 to 5 years, or as new major capacity-related projects are undertaken. As noted earlier, the City also uses available reserves for capital projects, as available. Financial Plan 10-8 2005 City of Bremerton Water System Plan 10.1.7 Summary of the FiJlancial Projections A summary of the financial plan and resulting financial status of the water system is provided in Table 10-3. This is an abbreviated summary of the detailed financial plan and analysis, which is provided at the end of this section. Table 10-3 Summary of the City's Projected Six-Year Financial Plan 2006 2007 2008 2009 2010 2011 SOURCES OF FUNDS Water Sales $6,068,728 $6,129,415 $6,190,709 $6,252,617 $6,315,143 $6,378,294 Navy (PSNS) Sales 1,305,740 1,305,740 1,305,740 1,305,740 1,305,740 1,305,740 Timber Sales 0 0 0 0 0 0 Other Revenue 464 500 468 230 471 997 475 802 479 645 483 527 Total Sources of Funds $7,838,968 $7,903,385 $7,968,447 $8,034,159 $8,100,528 $8,167,561 APPLICATIONS OF FUNDS O&M Expenses Plus Taxes $6,858,188 $6,963,839 $7,262,443 $7,563,102 $7,866,823 $8,373,871 Capital Outlays from Rates 300,000 700,000 700,000 721,000 743,000 765,000 Debt Service 765 183 816970 900417 1 057 985 1 163715 1 383 566 TOTAL NET REVENUE REQUIREMENT $7,923,371 $8,480,809 $8,862,860 $9,342,088 $9,773,538 $10,522,437 BALANCE/DEFICIENCY OF FUNDS ($84,403) ($577,423) ($894,413) ($1,307,929) ($1,673,010) ($2,354,876) Plus: Add'l Taxes w/Rate Increase $0 ($90,342) ($139,937) ($204,635) ($261,754) ($368,437) TOTAL BALANCE OF FUNDS ($84,403) ($667,765) ($1,034,350) ($1,512,564) ($1,934,764) ($2,723,314) RATE ADJUSTMENT REQUIRED 1.1% 9.0% 13.8% 20.0% 25.4% 35.4% PROPOSED RATE ADJUSTMENT 0.0% 10.0% 4.5% 5.0% 5.5% 5.5% ADDITIONAL REVENUE WITH RATE ADJUSTMEN $0 $743,516 $1,120,719 $1,564,391 $2,083,234 $2,638,646 BALANCE/DEFICIENCY OF FUNDS ($84,403) $75,750 $86,369 $51,827 $148,470 ($84,667) ADDITIONAL RATE ADJUSTMENT REQUIRE[ 1.1% -0.9% -1.0% -0.6% -1.5% 0.8% Debt Service Coverage Ratio - Water Utility - All Debt Before Rate Increase 4.20 3.63 2.92 2.16 1.77 1.17 When interpreting the results of Table 10-3, it is important to understand that the "Rate Adjustment Required" is cumulative. That is, any rate adjustments made in previous years would reduce what is required in the following years. If no adjustments were made prior to 2008, a 13.8 percent adjustment would be required. The model assumes expenses are completely expended within each year. Typically, utilities receive additional revenue, and actual expenditures do not always total 100 percent of budget appropriations. Therefore, the City has a number of options for deferring rate adjustments until the latter part of the planning period. Those options would include adjusting capital improvement timing, using more reserves for capital improvements, reducing some other operating expenses, and closely monitoring additional revenue or increased growth beyond the one percent assumed. The results of Table 10-3 show that existing rates are insufficient throughout the planning period under review. A "proposed" level of adjustment needed to transition the rates over time is provided in Section 10.1.10. Financial Plan 10-9 2005 City of Bremerton Water System Plan The financial plan presented in this section is predicated upon an assumed level of growth on the system (1.0 percent per year) and assumptions related to inflation. Should this growth increase, slow down, or not occur, the level of rate adjustment required will be affected. If costs escalate faster or slower than indicated in this plan, the projected rate adjustments shown in Table 10-3 would also be affected. 10.1.8 Reserve levels A key indicator of a utility's financial health and viability is its reserve levels. Because a majority of the utility's revenue is consumption-based, and therefore dependent upon weather conditions and usage patterns, maintaining adequate reserve levels is important for stable fiscal management. A discussion of the utility's reserves is provided below. Industry standards (American Water Works Association - AWWA) recommend that utilities maintain working capital reserves at a level adequate to handle unexpected occurrences, including unexpected cash flow fluctuations. A balance for an operations and maintenance reserve, or operating reserve, is recommended to be a minimum of 45 days (12%) of operations and tax expense. For the City, that minimum balance would equate to approximately $1 million inthe first half of the planning period, increasing to $1.2 million by 2011. The Cityhegins theplanningperiod in 2005 with a balanceof$2.l million in working capital. The balance increases throughout the time period due to capital needs being lower than available funding. The 2011 ending balance is approximately $3.4 million. Maintaining this balance will provide the city with flexibility in meeting future capital requirements. The City currently has a balance in the capital reserve fund. In 2005, this reserve is unfunded, but grows over the review period to $720,000 by 2011. Sound financial policies indicate that a capital. fund balance equal to an average year's worth of capital projects is a prudent reserve amount. For the City, this minimum capital fund target would be $3.4 million. Within the City's policies established in the 2004 rate study, a minimum target of six months of construction expenditures is to be in reserve. That would be approximately $1.7 million. Another measure used for a minimum target balance of capital reserve can be 1.5 percent of original plant value. For the water utility, that value is $1.4 million. The City will continue to watch this reserve level in future years and build to the minimum target level whenever. revenue exceeds the capital expenditures of a given year. Between the capital fund balance and the working capital reserve, the City's reserve levels are more than adequate to meet this target. The reserve review indicated that the City has adequate reserve funding to meet unanticipated obligations and genetaloperating fluctuations. The City has improved the financial stability of the Utility by clarifying financial planning goals and policies that define the appropriate reserves and other financial guidelines as part of the 2004 rate study. Financial Plan 10- 10 2005 City of Bremerton Water System Plan 10.1.9 Review of the Existing Water Rates Various "generally accepted" water rate structures can be used to establish or develop rates. The initial starting point in considering a rate structure is the relationship between fixed costs and variable costs. Fixed costs are generally collected as a fixed charge on a monthly basis (e.g., $5.00 per month/meter). This charge may be called by various names (e.g., customer charge, meter charge, base charge, etc.) but in all cases, it is intended to collect those fixed costs the utility incurs. Currently, the City has both a meter charge for service and a commodity charge based on usage. For a residential customer, the meter charge is a minimum charge. Different rate schedules apply to customers in different parts of the service area - inside the City, the County (including the Port of Bremerton and Rocky Point), Tracyton, and Jackson ParklPSNS. For purposes of this overview, the rates in effect as of January 2006 are presented in Table lO-4. Table 10-4 Overview ofthe City's 2006 Monthly Retail Water Rates Metered Rate/Month City Navy) Tracy ton 2 County Rocky Point 3 5/8 x 3/4" $9.22 $9.22 $9.22 $13.83 $13.83 1" 10.55 10.55 10.55 15.83 15.83 1-1/2" 14.98 14.98 14.98 22.47 22.47 2" 20.13 20.13 20.13 30.20 30.20 3" 38.20 38.20 38.20 57.30 57.30 4" 71.09 71.09 71.09 106.64 106.64 6" 252.30 252.30 252.30 378.45 378.45 8" 920.79 920.79 920.79 1,381.19 1,381.19 10" 3,287.53 3,287.53 3,287.53 4,931.30 4,931.30 12" 12,362.91 12,362.91 12,362.91 18,542.87 18,542.87 Commodity Charge 0-10 CCF/Month $1.00 No residential $1.00 $1.50 $1.50 > 10 $1.12 accounts $1.12 $1.68 $1.68 CCF/Month . Non-residential Commodity Charge $1.08 $1.08 $1.08 $1.62 $1.62 L PSNS pays a water rate as determined by contract - currently under review. 2. Tracyton Water District was assumed by the City in 2004. Former customers pay a surcharge of $7 .44/month for debt service. ~. Rocky Point WaterDistrict customers. pay a$2.50/month surcliargefor Pistrict administration and other expenses. Separate rate schedules apply to low-income senior customer and fire protection customer rate schedules that differ slightly from the rate schedules above. Customers outside City limits pay a 50 percent differential. A majority of the Utility's revenue (58 percent) comes from the retail customers within the City. An additional 37 percent comes from the retail sales to remaining retail Financial Plan 10-11 2005 City of Bremerton Water System Plan customers (including County customers and the Navy) and the remaining 5 percent from wholesale and fire-lines. The monthly bill for a City retail customer using 1,000 cubic feet of water (10 CCF) would be $19.22. A monthly bill for an average County customer using the same amount would be $28.83. The City's meter charge is based on the size of the customer's meter. This approach is used often to recognize that different meter sizes place different demands and capacity requirements on the system. It is common to base the meter charge rate differential on the A WW A safe operating capacity of the meter. The meter capacity approach is summarized in Table 10-5. Table 10-5 Example of the Development of Fixed Meter Charges Based Upon Meter Capacity Safe Maximum Oper. Meter Capacity Meter Charges at Meter Size Capacity GPM I Weight Factors Capacity Weightings 5/8x3/4" 20 1.00 $4.05/month I" 50 2.50 1O.l3 I ~1/2" 100 5.00 20.25 2" 160 8.00 32.40 3" 300 15.00 60.75 4" 500 25.00 101.25 6" 1,000 50.00 202.50 8" 1,600 80.00 324.00 10" 2,300 115.00 465.75 12" 3,375 168.75 683.44 I. A WW A C-700-77 Cold Water Meters - Displacement Type for 5/8x3/4" meter. Table 1 0-5 shows the fixed meter, or base charge, increases in relationship to the A WW A safe operating capacity of the various meter sizes. Meter capacity is an important concept in that a customer that has a 2" meter is regarded, from a capacity perspective, as the equivalent of eight 5/8 x 3/4" customers. For instance, the customer with a 2" meter is, from a capacity perspective, the equivalent of eight (8) single-family homes with 5/8 x 3/4" meters. Since a large portion of costs is generally related to meeting capacity requirements, it is important to take capacity into account when establishing rates for customers. The City's current meter charges do not follow these capacity ratings exactly and reflect local and unique circumstances related to its larger metered customers. The conceptual rate review undertaken indicates that the City's water rates are contemporary and attempt to capture the cost differential to serve customers with varying facility requirements based on their location. 10.1.1 o Overview of FutureWaterRates Based upon the results of the financial analysis, the City will require adjustments in rates in future years to meet the on-going operational and capital needs of the Water Utility. Table 10-6 shows the level of rate adjustment needed in future years for the 5-year projected period to meet operating and capital costs as identified within this plan. Financial Plan 10- 12 2005 City of Bremerton Water System Plan Table 10-6 Projected Rate Adjustments Needed from 2007 through 2011 Year 2007 2008 2009 2010 2011 Rate 10.0% 4.5% 5.0% 5.5% 5.5% Adjustment From the City's 2004 rate study and the updated revenue requirements in 2005, the City has shown its commitment to implementing the necessary rate adjustments in order to meet operating and capital costs and to meet debt service obligations. The adjustments shown above will need to be applied to all portions of the rate design, or specific rate design adjustments will need to be developed in order to ensure proper levels of revenue are achieved to meet the overall revenue requirement of each year. The City has expressed an interest in reviewing its' two'-tier conservation-based rates. Some alternative rate structure options for the Cityto consider are described below. 10.1.11 Conservation-Based Rate Design Options The City has implemented a number of conservation programs over the past several years. In addition to these programs, water rates can be an effective tool in improving efficient use of the water resource. A number of water rate structures can encourage efficient use of the City's drinking water resources. These include inverted-block rates, seasonal rates, and tailored rates. These rate designs require varying degrees of data and management for implementation. When considering conservation-based rate structures, certain rate structures are more applicable for certain customer classes of service. This is because one of the approaches in establishing conservation-based rates is to target the discretionary usage of the customer.' Outdoor watering is considered a more discretionary use than indoor use. Studies have consistently shown that the elasticity associated with outdoor use is more sensitive to changes in price than indoor use. At the same time, an inverted-:block rate structure for commercial customers may not be appropriate or difficult to establish given the varying consumption patterns of these customers. A first step towards implementation can be inverted-block rates, especially for residential customers. Fora residential rate structure, the block sizes or tiers are generally sized around average indoor use, average outdoor use, and inefficient or wasteful use. The number of blocks or tiers may Vary, but generally some rationale exists for establishing the various block sizes and targeted consumption (discretionary vs. non-discretionary). The pricing of each block increases - use more, pay more. As a point of reference, the City implemented a first step in an inverted'-block, or tiered rates, in 2005. The City may further refine these rates and is evaluating the potential of other measures to encourage Financial Plan 10-13 2005 City of Bremerton Water System Plan water resource conservation. These rate refinements will be reviewed later in 2006 along with other conservation measures. Seasonal rates are another alternative for consideration. In some cases, inverted block rates may not be appropriate for certain types of customers, but seasonal pricing may be. The intent of seasonal pricing is to provide a price signal to the customer of the higher costs associated with summer peak use. Seasonal rates can also be combined with inverted block or tiered rates. A relatively new conservation-based rate structure is a water budget or tailored rates. In simplistic terms, these are a variation of an inverted block rate, but the size of each block is individually determined for each customer based upon the number of inhabitants in the home, lot size, irrigation requirements, etc. These rate forms have had very limited introduction into the water utility industry due to a number of factors. Among these are the very high administrative costs associated with implementing these rates and determining individual customer block sizes. At the same time, most, if not all, utility billing programs are unable to handle thisparticular rate structure without some custom programming. Where water budget rate structures do seem to have an excellent application is for irrigation customers. The block sizes for the irrigation customer are tailored for the specific property being irrigated. 10.1.12 Summary The financial plan results presented in this section indicate water rates for the six-year projected time horizon of 2006 to 2011 will require adjustments to fund the projected operations and maintenance, capital, and debt service requirements. The City has an interest in enhancing the conservation message within the existing rate structure some time in the near future. The City is committed to the responsible management of the Water Utility by past rate adjustments and by funding adequate levels of operations, capital, and reserves. Continued fiscal management will enable the Utility to continue to operate on a financially sound basis. 10.2 References A WWA C-700 Cold Water Meters - Displacement Type for 5/8x3l4" meter. City of Bremerton. Rate Study. HDRlEES. 2004. Financial Plan 10-14 City of Bremerton - Water Department - Water Utility SUMMARY OF SOURCES AND APPLICATIONS OF FUNDS 2006 2007 2008 2009 2010 2011 SOURCES OF FUNDS Water Sales $6,068,728 $6,129,415 $6,190,709 $6,252,617 $6,315,143 $6,378,294 Navy (PSNS) Sales 1,305,740 1,305,740 1 ,305,740 1,305,7 40 1,305,740 1,305,740 Timber Sales (included within the capital fund) 0 0 0 0 0 0 Other Revenue 464,500 468,230 471 ,997 475,802 479,645 483,527 Total Sources of Funds $7,838,968 $7,903,385 $7,968,447 $8,034,159 $8,100,528 $8,167,561 APPLICATIONS OF FUNDS O&M Expenses Plus Taxes $6,858,188 $6,963,839 $7,262,443 $7,563,102 $7,866,823 $8,373,871 Capital Outlays from Rates 300,000 700,000 700,000 721,000 743,000 765,000 Debt Service 765,183 816,970 900,417 1 ,057,985 1 ,163,715 1 ,383,566 TOTAL NET REVENUE REQUIREMENT $7,923,371 $8,480,809 $8,862,860 $9,342,088 $9,773,538 $10,522,437 BALANCE/DEFICIENCY OF.FUNDS ($84,403) ($577,423) ($894,413) ($1,307,929) ($1,673,010) ($2,354,876) Plus: Add'l Taxes w/Rate Increase $0 ($90,342) ($139,937) ($204,635) ($261,754) ($368,437) TOTAL BALANCE OF FUNDS ($84,403) ($667,765) ($1,034,350) ($1,512,564) ($1,934,764) ($2,723,314 ) RATE ADJUSTMENT REQUIRED 1.1% 9.0% 13.8% 20.0% 25.4% 35.4% PROPOSED RATE ADJUSTMENT 0.0% 10.0% 4.5% 5.0% 5.5% 5.5% ADDITIONAL REVENUE WITH RATE ADJUSTMENT $0 $743,516 $1,120,719 $1,564,391 $2,083,234 $2,638,646 BALANCE/DEFICIENCY OF FUNDS ($84,403) $75,750 $86,369 $51,827 $148,470 ($84,667) ADDITIONAL RATE ADJUSTMENT REQUIRED 1.1% -0.9% -1.0% -0.6% -1.5% 0.8% Working Capital Beginning Balance $2,155,257 $3,220,854 $3,296,604 $3,382,973 $3,434,800 $3,583,270 Plus: Additional 1,150,000 75,750 86,369 51,827 148,470 0 Less: Transfer to Capital Fund 0 0 0 0 0 0 Less: Uses (84,403) 0 0 0 0 (84,667) Ending Working Capital $3,220,854 $3,296,604 $3,382,973 $3,434,800 $3,583,270 $3,498,603 Minimum Target 12% of Tota/Expenses $1,142,805 $1,269,697 $1,377,343 $1,134,465 $1,180,023 $1,256,081 Capital Fund Ending Balance $0 $86,000 $421,000 $1,207,000 $460,000 $720,000 Total Working Capital and Capital Fund $3,220,854 $3,382,604 $3,803,973 $4,641,800 $4,043,270 $4,218,603 Debt Service Coverage Ratio- Water Utility - All Debt Before Rate Increase 4.20 3.63 2.92 2.16 1.77 1.17 After Rate Increase 4.20 4.54 4.16 3.64 3.56 3.08 CITY OF BREMERTON WATER DEPARTMENT EXHIBIT 1 ESCALATION FACTORS 2006 2007 2008 2009 2010 2011 Escalation Factors Revenues: Other Revenues 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% Expenses: Power 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% Labor (68% @ 3%,12%@3%, 20%@26%-medical) 7.60% 7.60% 7.60% 7.60% 7.60% 7.60% Materials & Supplies 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% Equipment 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% Miscellaneous 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% Depreciation 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% New Debt Service: Long Term Debt Term in Years 20 20 20 20 20 20 Rate 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% Long Term Debt (DWSRF Loan) Term in Years 20 20 20 20 20 20 Rate 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% Interest Rates Interest Income 3.0% 3.0% 4.0% 4.0% 4.0% 4.0% Growth 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% CITY OF BREMERTON Page 1 of 7 WATER DEPARTMENT EXHIBIT 2 SOURCES AND APPLICATIONS OF FUNDS 2006 2007 2008 2009 2010 2011 Basis of Classification SOURCES OF FUNDS Rate Revenues .101,34.343.4001 Water Sales Retail $6,068,728 $6,129,415 $6,190,709 $6,252,617 $6,315,143 $6,378,294 Rev Rpt@ 1% growth .101.34.343.4002 PSNS Sales 1,305,740 1 ,305,740 1 ,305,740 1 ,305,740 1 ,305,740 1 ,305,740 Flat Total Rate Revenues $7,374,468 $7,435,155 $7,496,449 $7,558,357 $7,620,883 $7,684,034 Other Revenues Discretionary Revenue' $0 $0 $0 $0 $0 $0 One ti me 2004 '101.34.341.4300 Billing Services 11,000 11,110 11,221 11,333 11,447 11,561 As Other Revenue .10\.34.341.5000 General Gov\. (sale of maps/marine bill) 1,000 1,010 1,020 1,030 1,041 1,051 As Other Revenue .101.34.342.4007 Mise Inspections 0 0 0 0 0 0 As Other Revenue 401.34.343.4002 Other Service Char~Jes 100,000 101,000 102,010 103,030 104,060 105,101 As Other Revenue <101.34.343.4006 Water Connection /Other Charges 150,000 151,500 153,015 154,545 156,091 157,652 As Growth 401.34.345.8300 PlanChecking Fees 1,000 1,010 1,020 1,030 1,041 1,051 As Other Revenue 401.34.362.500\ Park. Facilities Rentals 1,000 1,000 1,000 1,000 1,000 1,000 Flat 0\01.34.366.1000 Interfund Interest 0 0 0 0 0 0 One time 2004 401.34.361.1100 Investmenllnterest 25,000 25,250 25,503 25,758 26,015 26,275 As Other Revenue 0101.34.362.5002 L.T. Facilities Lease 75,000 75,750 76,508 77,273 78,045 78,826 As Other Revenue 401.34.362.6001 Housing Rentals - U\i.lity 4,000 4,000 4,000 4,000 4,000 4,000 Flat 401.34.366.2000 Intertund Rents 20,000 20,000 20,000 20,000 20,000 20,000 Flat 401.34.368,1000 ULlD Special Assessments 61,500 61,500 61,500 61,500 61,500 61,500 Flat <101,34.359.4000 Judgements and Settlements 5,000 5,000 5,000 5,000 5,000 5,000 Flat 401.34.:369.9000 Other Misc. Revenue. 10,000 10,100 10,201 10,303 10,406 10,510 As Other Revenue Total Olher Revenu()s $464,500 $468,230 $471,997 $475,802 $479,645 $483,527 Total Revenues $7,838,968 $7,903,385 $7,968,447 $8,034,159 $8,100,528 $8,167,561 APPLICATIONS OF fUNDS '101.34.534.1034 Water Administration X.X.X.X.51QQt Labor/Benefits $247,097 $265,876 $286,083 $307,825 $331,220 $356,393 As Labor >:'.X.X.X.50750 Reallocated Equipment Costs 0 0 0 0 0 0 As Equipment x..X.>:'.X.53110 Office & Operating Supplies 15,000 15,150 15,302 1 5,455 15,609 15,765 As MaUSupplies X,X.X,X.53119 Office Supplies - Interfund 0 0 0 0 0 0 As MaUSupplies X.X,X.X.53510 Small Tools & Equipment 3,200 3,232 3,264 3,297 3,330 3,363 As Equipment X,XXX.53530 Computer Related lIems 2,000 2,020 2,040 2,061 2,081 2,102 As Equipment x..X.X.X.54000 Reallocated Vehicle Costs 0 0 0 0 0 0 As Equipment X.X..X.X..54110 Prof.. Services 0 0 0 0 0 0 As Misc. X.X..X.X.54119 Professional Services - Interfund 466,248 470,910 475,620 480,376 485,180 490,031 As MiSC.-General Fund X..X.X.X.54210 Telecommunications 40,000 40,400 40,804 41,212 41,624 42,040 As Misc. X.X.X.X..54220 Postage 2,000 2,020 2,040 2,061 2,081 2,102 As Misc. X..X.X..X.54300 Travel 3,000 3,030 3,060 3,091 3,122 3,153 As Misc. X..X.X.X..54400 Advertising 500 505 510 515 520 526 As Misc. X.X.X.X.54520 Equipment Rental 4,000 4,040 4,080 4,121 4,162 4,204 As Equipment X.X.X.X.54529 EqUipment Rentallnterfund. 10,212 10,314 10,417 10,521 10,627 10,733 As Equipment X.X.X.X.54619 Insurance Premiums - Interfund 146,281 147,744 149,221 150,713 152,221 153,743 As Misc. - Risk Management X..X.X..X.54809 Information Technology 13,325 13,458 13,593 13,729 13,866 14,005 As Misc. X.X.X.X.54Bl0 Equipment Repair 14,666 14,813 14,961 15,110 15,261 15,414 As Misc. x.x..X.X.54910 Miscellaneous 12,000 12,120 12,241 12,364 12,487 12,612 As Misc. Total Administration $979,529 $1,005,633 $1,033,237 $1,062,451 $1,093,392 $1,126,186 CITY OF BREMERTON Page 2 of 7 WATER DEPARTMENT EXHIBIT 2 SOURCES AND APPLICATIONS OF FUNDS 2006 2007 2008 2009 2010 2011 Basis of Classification 534.7034 Customer Service X.X.X.X.51001 Reallocated Lat,or Costs $207,184 $222,930 $239,873 $258,103 $277,719 $298,825 As Labor X.X.X.X.53110 Office & Operating Supplies 5,000 5,050 5,101 5,152 5,203 5,255 As Mat/Supplies XXXXS3S3SI0 Small Tools and Equipment 0 0 0 0 0 0 As Equipment X.X.XXS3S30 Computer Related Items 46,500 46,965 47,435 47,909 48,388 48,872 As Equipment X.X.X.X.S4000 Reallocated Vehicle Costs 0 0 0 0 0 0 As Equipment X.X.X.X.S411 0 Professional Services (PSE billing) 5,000 5,050 5,101 5,152 5,203 5,255 As Misc. X.X.XXS4119 Professional Services Interlund 0 0 0 0 0 0 As Misc. X.X.XXS4210 Telecommunication 0 0 0 0 0 0 As Misc. X.X.x.X.54220 Postage 25,000 25,250 25,503 25,758 26,015 26,275 As Misc. XXXXS4300 Travel 0 0 0 0 0 0 As Misc. X,X.X,X,S4520 Equipment Rental 1,783 1,801 1,819 1,837 1,855 1,874 As Equipment X.X.XXS4809 Information Technology 8,885 8,974 9,064 9,154 9,246 9,338 As Misc. XXXXS4810 Equipment Repair 1,615 1,631 1,647 1,664 1,681 1,697 As Misc. X.X.XXS4910 Miscellaneous 20,000 20,200 20 ,402 20,606 20,812 21,020 As Misc. Total Cust. Service & Marketing $320,967 $337,851 $355,943 $375,334 $396,122 $418,413 Total Water Administration $1,300,496 $1,343,484 $1,389,180 $1 ,437,784 $1,489,514 $1,544,599 Engineering 534.8037 Operations XXX.X.SIOOI Reallocated Latlor Costs $271,925 $292,591 $314,828 $338,755 $364,501 $392,203 As Labor XXXXS3120 Office & Operating Supplies 3,000 3,030 3,060 3,091 3,122 3,153 As Mat/Supplies X.XXX.53510 Small Tools &. Equipment 1,000 1,010 1,020 1,030 1,041 1,051 As Equipment XXX.X.S3S30 Computer Related items 6,000 6,060 6,121 6,182 6,244 6,306 As Equipment XXXXS4000 Reallocated Vellicle Costs 0 0 0 0 0 0 As Equipment XXXXS4IIO Prof. Services - External 35,000 35,350 35,704 36,061 36,421 36,785 As Misc. X,X.X.X.S421D Telecommunications 600 606 612 618 624 631 As Misc. XXXXS4300 Travel 1,000 1,010 1,020 1,030 1,041 1,051 As Misc. XXX.X.S4220 Postage 100 101 102 103 104 105 As Misc. X.X.X.X.54119 Advertising 0 0 0 0 0 0 As Misc. XXXXS4S20 Rents - Equipment 10,736 10,843 10,952 11,061 11,172 11,284 As Equipment X.X.XXS4809 Information Technology 18,358 18,542 18,727 18,914 19,103 19,294 As Misc. XXXXS810 Equipment Repair 11,768 12,662 13,625 14,660 15,774 16,973 As Labor X.X.X.X.54910 Miscellaneous 1,000 1,010 1,020 1,030 1,041 1,051 As Misc. Total Engineering Operations $360,487 $382,816 $406,791 $432,536 $460,187 $489,887 CITY OF BREMERTON Page 3 of 7 WATER DEPARTMENT EXHIBIT 2 SOURCES AND APPLICATIONS OF FUNDS 2006 2007 2008 2009 2010 2011 Basis of Classification 401.31 Water Resource Manager X.X.534.5031 Maintenance X.X.X.X.50700 Reallocated Latlor Cost $252,700 $271,905 $292,570 $314,805 $338,731 $364,474 As Labor XXXXS311Q Office & Operating Supplies 45,000 45,450 45,905 46,364 46,827 47,295 As Mat/Supplies X.X.X.X.53i21 Utility Inventory 1,500 1,515 1,530 1,545 1,561 1,577 As Mat/Supplies X.X.X.X.53119 Operating Supp.- Interiund 0 0 0 0 0 0 As Mat/Supplies X.X.X.X.53219 Fuel Consumed - IFD 0 0 0 0 0 0 As Misc. XXX.X.53510 Small Tools & Equipment 12,000 12,120 12,241 12,364 12,487 12,612 As Equipment X.X.X.X,53530 Computer Related Items 4,000 4,040 4,080 4,121 4,162 4,204 As Equipment X.X.XX53520 Small Equipment & Furniture 0 0 0 0 0 0 As Equipment X.X.X.X.54QOO Reallocated Vehicle Costs 0 0 0 0 0 0 As Equipment X.X,X,X.5411D Professional Services - External 25,000 25,250 25,503 25,758 26,015 26,275 As Misc. XXX.X.54220 Postage 0 0 0 0 0 0 As Mat/Supplies X.X.X.X.5452D Equipment 3,000 3,030 3,060 3,091 3,122 3,153 As Equipment XXXX54740 Garbage 0 0 0 0 0 0 As Misc. X,XXX.5481Q Equipment Repair 5,000 5,050 5,101 5,152 5,203 5,255 As Equipment XXX.X.54619 Equipment Repair - Interiund 0 0 0 0 0 0 As Equipment XXX.X.54620 Other Improvements 5,000 5,050 5,101 5,152 5,203 5,255 As Misc. X.X.X.X.5463D Structures &Grounds Repair 185,000 186,850 188,719 190,606 192,512 194,437 As Misc. for Reservoirs XXX.X.54910 Miscellaneous 5,000 5,050 5,101 5,152 5,203 5,255 As Misc. Total Maintenance $543,200 $565,310 $588,909 $614,108 $641,026 $669,792 X.X.534.7031 Customer Service XXX.X.50700 Reallocated Labor Costs $11,919 $12,825 $13,800 $14,848 $15,977 $17,191 As Labor XXXX53120 Office & Operating Supplies 5,000 5,050 5,101 5,152 5,203 5,255 As Mat/Supplies X.x.X.X.53121 Utility Inventory 0 0 0 0 0 0 As Mat/Supplies XXXX53510 Small Tools I'; Equipment 500 505 510 515 520 526 As Equipment X.XXX.54DOO Reallocated Vel1icle Costs 0 0 0 0 0 0 As Equipment XXX.X.541! 0 Prof. Services E:xternal 7,500 7,575 7,651 7,727 7,805 7,883 As Misc. X.XXX.5422D Postage 100 101 102 103 104 105 As Mat/Supplies XXXX54300 Travel 0 0 0 0 0 0 As Misc. XXX.X.54400 Advertising 500 505 510 515 520 526 As Misc. X.X.X.X.54520 Renls - Equipment 0 0 0 0 0 0 As Misc. XXX.X.54910 Miscellaneous 4,000 4,040 4,080 4,121 4,162 4,204 As Misc. Total Cust. Service $29,519 $30,601 $31,753 $32,982 $34,291 $35,689 CITY OF BREMERTON Page 4 of 7 WATER DEPARTMENT EXHIBIT 2 SOURCES AND APPLICATIONS .OF FUNDS 2006 2007 2008 2009 2010 2011 Basis of Classification :<'x'S34.e031 Operations X.X.X.X.51QOl Reallocated Labor Costs $483,548 $520,298 $559,840 $602,388 $648,170 $697,431 As Labor x.X.X.X.53110 Oltice & Operating Supplies 60,000 60,600 61,206 61,818 62,436 63,061 As Mat/Supplies X.X,X.X.53121 Utility Inventory 0 0 0 0 0 0 As Mat/Supplies x.X.X.X.5321Q Vehicle Fuel 0 0 0 0 0 0 As Equipment X,XXX.53510 Small Tools & Equipment 40,000 40,400 40,804 41,212 41,624 42,040 As Equipment X.X.X,X.S3530 Computer Related Items 2,000 2,020 2,040 2,061 2,081 2,102 As Equipment X,X.X.X.54QOQ Reallocated Vehicle Costs 0 0 0 0 0 0 As Equipment X.X.XXS411O Professional Services - External 265,000 101,000 102,010 103,030 104,060 185,101 As Misc.; Comp Planning 06/11 new Monitoring Crypto/Giardia 0 4,500 5,850 1,350 0 0 Camp Plan Estimates new Monitoring Radionuciides 0 0 1,350 0 0 1,350 One-time costs: From City new IDSE Plan 0 10,000 18,000 22,000 0 8,000 Draft Estimates new New UV Treatment O&M 0 0 0 0 0 63,000 New O&M Costs; As Labor new UCMR 0 0 5,000 5,000 0 0 One-time costs: From City x.X,X.X.5421Q Telephone 8,000 8,080 8,161 8,242 8,325 8,408 As Misc. x.X.XXS4220 Postage 500 505 510 515 520 526 As Mat/Supplies x.X.x.X.S4300 Travel 2,500 2,525 2,550 2,576 2,602 2,628 As Misc. X.X.X.X.544QD Advertising 0 0 0 0 0 0 As Misc. X.X.X.X.5<l520 Equipment 14,604 14,750 14,898 15,047 15,197 15,349 As Equipment XXX,X.5<l710 Natural Gas 2,000 2,020 2,040 2,061 2,081 2,102 As Misc. XXX.X.54720 Electricity 285,000 293,550 302,357 311,427 320,770 330,393 As Power XXXX.54730 Water/Sewer/Stormwater 400 404 408 412 416 420 As Misc. x. x. x. X.54809 Information Technology 27,142 27,413 27,688 27,964 28,244 28,527 As Misc. X.X.X.X.5481Q Equipment Repair 29,349 29,642 29,939 30,238 30,541 30,846 As Equipment X.X.X.X.54820 Repairs - Other Improvements 5,000 5,050 5,101 5,152 5,203 5,255 As Misc. X.X.X.X.54830 Structures & Ground Repair 15,000 15,150 15,302 15,455 15,609 15,765 As Misc. x.X.X.X.5491Q Miscellaneous 32 ,200 32,522 32,847 33,176 33,507 33 ,843 As Misc. Total Operations $1 ,272 ,243 $1,170,430 $1,237,900 $1,291,123 $1,321,387 $1,536,145 Total Water Resources $1,844,962 $1,766,341 $1,858,562 $1,938,212 $1,996,704 $2,241,627 Wastewater Manager '5341.9032 Other Operations - Bioso/ids XXX.X.SIOOl Reallocated Labor Costs $83,200 $89,523 $96,327 $103,648 $111,525 $120,001 As Labor X.X.X.X.53110 Office & Operating Supplies 60,000 60,600 61,206 61,818 62,436 63,061 As Mat/Supplies X.X.x.X.53121 Utility Inventory 0 0 0 0 0 0 As Mat/Supplies XXX.X.5351O Small Tools & Equipment 0 0 0 0 0 0 As Equipment X.XXX.54000 Reallocated Vehicle Costs 0 0 0 0 0 0 As Equipment X.XXX.54,10 Prof. Services - External 0 0 0 0 0 0 As Misc. X.XXX.54720 Electricity 9,500 9,785 10,079 10,381 10,692 11,013 As Power x.XXX.S81Q Equipment Repair 0 0 0 0 0 0 As Misc. X.X.X.X.54910 Miscellaneous 0 0 0 0 0 0 As Misc. Total Wastewater Manager $152,700 $159,908 $167,612 $175,847 $184,654 $194,075 CITY OF BREMERTON Page 6 017 WATER OEPARTMENT EXHIBIT 2 SOURCES AND APPLICATIONS OF FUNDS 2006 2007 2008 2009 2010 2011 Basis of Classification 53~.90J9 Other Operations )(x,x.x.51oo1 Reallocated Labor Cost $336,356 $361,919 $389,425 $419,021 $450,867 $485,133 As Labor X.X,X.)(,51060 Overtime Pay (Cops Watershed Palrol) 0 0 0 0 0 0 As Labor X.X.X.X,SJ110 Office & Opera ling Supplies 25,000 25,250 25,503 25,758 .26,015 26,275 As MaVSupplies X.)(.)(,X,53121 Ulility Invenlory 100 101 102 103 104 105 As MaVSupplies X,X.X.X,53119 Operating Supplies. .lnterfund 0 0 0 0 0 0 As MaVSupplies X.X.X,X,53210 Vehicle Fuel 0 0 0 0 0 0 As Misc. X,X.X,)(.53510 Small Tools & Equipment 1,500 1,515 1,530 1,545 1,561 1,577 As' Equipment X,X,X.X,5:l530 Computer Related Items 500 505 510 515 520 526 As' Equipment X.X,X.)(.54ooo Reallocated Vehicle Costs. 0 0 0 0 0 0 As Equipmenl X,X,)(.X,5-/.110 Professional Services ~ External 25,000 25,250 25,503 25,758 26,015 26,275 As Mlsc./biosollds mgmt, mise X,)(.X,X.54210 T elecommunicalions 500 505 510 515 520 526 As Misc. X.lCX'x'54220 Postage 250 253 255 258 260 263 As MaVSupplies X.X.X.X,0..3OO Travel 1,000 1,010 1,020 1,030 1,041 1,051 As Misc. X.)(.X.)(.544oo Advertising 100 101 102 103 104 105 As Misc. X.X.X'x'54520 Equipment 1,500 1,515 1,530 1,545 1,561 1,577 As Equipment X.X.X.x.545<'9 Equipment. lnlerfund 31,446 31,760 32,078 32,399 32,723 33,050 As Equipmenl X.lCX.x.54710 Natural Gas 1,500 1,515 1,530 1,545 1,561 1,577 As Misc. X.)(,)(.X.54720 Electricity 3,000 3,090 3,183 3,278 3,377 3,478 As Power xX.X.X.SH.O Garbage 500 505 510 515 520 526 As Misc. X,X.X.)(.54809 Inlormation Technology 7,403 7,477 7,552 7,627 7,704 7,781 As Misc. X,X,X,X 54810 Equipmenl Repair 16,971 17,141 17,312 17,485 17,660 17,837 As Misc. X.X.X.X.5482O Other Improvements 1;000 1,010 1,020 1,030 1,041 1,051 As Misc. X.X.X.x.5<48JO Slructures & Grounds 1;000 1,010 1,020 1,030 1,041 1,051 As Misc. X.X.X.X.54910 Miscellaneous 20,000 20,200 20,402 20,606 20,812 21,020 As Misc. Total Other Operations $474,626 $501,632 $530,597 $561,668 $595,006 $630,781 Total Forestry $589,693 $620,673 $653,866 $689,439 $727,572 $768,457 Total O&M Expense $5,852,484 $5,966,925 $6,265,736 $6,566,520 $6,861,782 $7,360,286 TaxeslTranster Payment:s. X.X.X.X.55100 Intergovern Service & Ta:( $370,862 $373,914 $376,996 $380,110 $383,254 $386,430 5.029% of water sales X.X.X.X.5S409 Payment In-Lieu 01 Taxes 634,842 623,000 619,710 616,472 621,787 627,155 8.5% 01 Retail Rate Rev T Timber ULlD Payment (12%) 0 0 0 0 0 0 One Time ULlD Paymenl (City Ownership) 0 0 0 0 0 0 One Time X.X.X.X.55300 External Taxes & Assessments 0 0 0 0 0 0 DOH Connection Surcharge Total TaxeslTranslerPayments $1,005,704 $996,914 $996,707 $996,582 $1,005,041 $1,013,585 Total O&M Plus Taxes $6,858,188 $6,963,839 $7,262,443 $7,563,102 $7,866,823 $8,373,871 Debt Service Existing PWTF 36~ Water Main GiJrst $187,342 $185,684 $184,026 $182,368 $180,710 $179,053 Debt Schedule PWTF Tracy ton 12,681 12,483 12,285 12,087 11,889 11,691 Est. Repmt Sched. Existing DWSRF. Corrosion Clrl/I'eserv #4 $76,526 $74,564 $72,601 $70,601 $68,601 $66,601 Estimated Repayment Schedule Existing DWSRF. Casad Dam Se'ismic Intake Tower 54,239 52,840 50,327 48,427 46,527 44,627 Estimated Repayment Schedule Existing DWSRF. East West Flow .Imprvmts 69,409 81,945 80,945 79,945 78,945 77,945 Estimated Repaymenl Schedute Aclive Existing DWSAF ' PS #4 Upgrade 68,197 74,926 73,926 72,926 71,926 70,926 Estimated Repayment Schedule ActJve Existing DWSAF. Tracylon 195,415 191.926 188,436 186,436 184,436 182,436 Estimaled Aepayment Schedule Existing DWSRF. Casad Dam H.B Valve 4,994 4,935 4,876 4,788 4,699 4,611 Estimated Repayment Schedule DWSAF. NAD Park Bani, Stabilizalion 2,071 2,046 2,022 1,985 1,948 1,911 Eslimated Repayment Schedule DWSRF . Anderson Creek Chlorine Generator 5,882 6,852 6,352 5,852 5,352 4,852 Estimated Repayment Schedule DWSRF. Aeservoir Seismic Valv/Upgrades 21,741 21,487 21,234 20,854 20,473 20,093 Estimated Aepayment Schedule Port 01 Bremerton Rap 0 0 0 0 0 114,121 Port reservoir payment in 2011 Sold their reservl ULlD 61,500 61,500 61,500 61,500 61,500 61,500 Balanced to ULlD revenue Exisling Other. Capital Lease Pitney Bow 5,186 0 0 0 0 0 Capital Lease; ends 2006 New DWSRF Loan 0 45,781 141 ,887 310,217 426,708 543,200 new debt assumptions Sublotal DWSAF $565,160 $618,803 $704,106 $863,530 $971,116 $1,192,822 Calculated CITY OF BREMERTON Page 7 of 7 WATER DEPARTMENT EXHIBIT 2 SOURCES AND APPLICATIONS OF FUNDS 2006 2007 2008 2009 2010 2011 Basis of Classification New Revenue Bond $0 $0 $0 $0 $0 $0 Total Debt Service $765,183 $816,970 $900,417 $1,057,985 $1,163,715 $1,383,566 Net Revenue Available for Capital Funding $215,597 $122,577 ($194,413) ($586,929) ($930,010) ($1,589,876) Capital Improvements Net CIP From Rates $300,000 $700,000 $700,000 $721,000 $743,000 $765,000 From Capital Plan Cash Working Capital $0 $0 $0 $0 $0 $0 TOTAL NET REV. REQUIREMENT $7,923,371 $8,480,809 $8,862,860 $9,342,088 $9,773,538 $10,522,437 Balance/(Deficiency) of Funds ($84,403) ($577,423) ($894,413) ($1,307,929) ($1 ,673,010) ($2,354,876) Plus: Additional Taxes wlRate Increase $0 ($90,342) ($139,937) ($204,635) ($261,754) ($368,437) Total Balance/(Deficiency) of Funds ($84,403) ($667,765) ($1,034,350) ($1,512,564) ($1,934,764) ($2,723,314) Totallnc.l(Decmase) as a % of Rates 1.1% 9.0% 13.8% 20,0% 25.4% 35.4% Debt Service Coverage Ratio - Water Utility - All Debt Before Rate Increase 4.20 3.63 2.92 2.16 1.77 1.17 After Rate Increase 4.31 4.44 4.06 3.59 3.43 3.14 Debt Service Coverage Ratio - Water Utility - Revenue Bond Debt Before Rate Increase 0.00 0.00 0.00 0.00 0.00 0.00 After Rate Increase 0.00 0.00 0.00 0.00 0.00 0.00 Debt Service Coverage Ratio - Combined Utility Before Rate Increase 1.33 1.24 2.21 1.75 1.53 1.24 After Rate Increase 1.90 2.02 3.89 3.41 3.36 3.18 Debt service coverage = 1.30 Gross revenue of the system = all the earnings and revenue received by the system from any source including sale of forest products, except; general ad valorem taxes, grants, refunded bond escrow acct earnings, gifts to system for capital purposes, proceeds from sale of city property, proceeds from city or system obligations Operating and Maintenance expenses = all reasonable expenses incurred by the City including insurance premiums, state imposed taxes payment to another agency for treatment or sewage disposal, excluding depreciation, city imposed utility taxes or PILOT. CITY OF BREMERTON WATER DEPARTMENT Page 1 of 2 EXHIBIT 2A CAPIT Al FUNDING ANALYSIS SUMMARY 2006 2007 2008 2009 2010 2011 Total Beginning Balance $0 $0 $86,000 $421,000 $1,207,000 $460,000 Total Capital Projects Annual Substandard Water Main Replacement Program 200,000 200,000 200,000 300,000 300,000 325,000 $1,525,000 Annual Distribution Main Replacements' 200,000 500,000 800,000 1,000,000 500,000 500,000 3,500,000 Annual Misc. Cap. Improv. Water Resources Division 100,000 100,000 100,000 100,000 100,000 125,000 625,000 Annual Misc. Equipment Water Operations Division 15,000 15,000 15,000 15,000 15,000 15,000 90,000 Annual Acquisition of Replacment Meters 0 0 0 0 0 0 0 Annual Tap/Meters 65,000 65,000 65,000 65,000 65,000 70,000 395,000 Annual Meter Replacements 100,000 100,000 100,000 100,000 100,000 150,000 650,000 Annual Fire Hydrants 20,000 20,000 20,000 20,000 20,000 20,000 120,000 Anderson CreekWellfield Improvements 400,000 0 0 0 0 0 400,000 West 580 Zone Development 40,000 0 0 0 0 0 40,000 Ultra Violet Treatment Facility 60,000 300,000 700,000 0 2,000,000 2,000,000 5,060,000 Pump Station #4 Upgrade and Transmission Main 400,000 0 0 0 0 0 400,000 Water Meters, Extra Large Replacements 150,000 150,000 0 0 0 0 300,000 Water System Security Improvements 50,000 50,000 0 0 0 0 100,000 MeKenna Falls Road Repair 50,000 0 0 0 0 0 50,000 Anderson Creek'Chlorination Upgrades 50,000 0 0 0 0 0 50,000 Reservoir #12 Roof Replc. And Seismic Upgrades 0 400,000 0 0 0 0 400,000 Booster Sta. #3 Abandonment and Zone Improvements 0 0 300,000 0 0 0 300,000 Watershed land. Purchases 0 300,000 0 0 0 0 300,000 Reservoir 15,18,17,19,20 5 Seismic Isolation Valves 0 150,000 0 0 0 0 150,000 Well 22 Pump and Controls 0 120,000 0 0 O. 0 120,000 Pressure Regulating Valves 0 50,000 50,000 0 0 0 100,000 Warren and Manette Isolation Valves 0 0 100,000 0 0 0 100,000 McKenna Falls Wier 0 75,000 0 0 0 0 75,000 Trailer Mounted Generator 0 75,000 0 0 0 0 75,000 Pump Station 17 MCC/Gorst.Coritrol Valve 0 50,000 0 0 0 0 50,000 Heinz Creek Bridge (2000 Rd Cuvert) 0 50,000 0 0 0 0 50,000 Reservoir 8 Drain 0 30,000 0 0 0 0 30,000 13 Street, Ohio Street and High Str. . 12" Distribution Main 0 0 30,000 0 850,000 0 880,000 Upgrade Disinfection Sys. For Union River Supply 0 0 50,000 0 0 500,000 550,000 Gold Mtn. Gold Course Irrigation 0 0 50,000 0 350,000 0 400,000 Well1R Upgrades 0 0 200,000 0 0 0 200,000 Forestry Offices Upgrades 0 0 150,000 0 0 0 150,000 Manette Breidge.Water Main 0 0 75,000 0 0 0 75,000 Casad Dam Early Warning System 0 0 60,000 0 0 0 60,000 C Street from Oyster Bay to National Ave. . 24" Pipe 0 0 250,000 1 ,750,000 0 0 2,000,000 Oyster Bay Remodel and Expansion 0 0 0 375,000 0 0 375,000 Reservoir #14 Demolition 0 0 0 25,000 275,000 0 300,000 Hardening of Casad Dam Overflow 0 0 0 200,000 0 0 200,000 Well 18 Pump and Motor 0 0 0 75,000 0 0 75,000 Twin Lakes Diversion Improvements 0 0 0 0 75,000 0 75,000 Emergency Source Upgrades 0 0 0 0 40,000 0 40,000 0 0 0 0 0 0 0 0 Distribution Projects; Additional Storage 0 0 0 0 0 0 0 Total Project Costs $1,900,000 $2,800,000 $3,315,000 $4,025,000 $4,690,000 $3,705,000 $20,435,000 CITY OF BREMERTON WATER DEPARTMENT Page 2 of 2 EXHIBIT 2A CAPITAL FUNDING ANALYSIS SUMMARY 2006 2007 2008 2009 2010 2011 Total Less: Funding Sources Annual Rate Funded Capital $300,000 $700,000 $700,000 $721,000 $743,000 $765,000 $3,929,000 System Development Chaq)es 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Timber Sales. 1,400,000 1,200,000 1,100,000 1,000,000 1,000,000 1,000,000 6,700,000 Intergovernmental (loan/grant proceeds) 0 0 0 0 0 0 0 Non-taxable Sale 0 0 0 0 0 0 0 Grants 0 0 0 0 0 0 0 From Cash Reserves 0 0 0 0 0 0 0 State Loan - DWSRF 0 786,000 1,650,000 2,890,000 2;000,000 2,000,000 9,326,000 Interfund Loan Payment- Pendergast 0 0 0 0 0 0 0 Revenue Bonds 0 0 0 b 0 0 0 Total Funding Sources $1,900,000 $2,886,000 $3,650,000 $4,811,000 $3,943,000 $3,965,000 $21,155,000 Additional Capital Funding $0 $0 $0 $0 $0 $0 Ending Capital Reserves $0 $86,000 $421 ,000 $1,207,000 $460,000 $720,000 Target Funding; Annual Average Capital or $3,410,000 1.5% of Original Plant Value $1,400,000 Appendices Department of Health Water System Plan Submittal Form and Checklist Water Facilities Inventory 2005 Consumer Confidence Report State Environmental Policy Act Checklist and Determination of Non-significance Public Meeting Documentation Water Use Efficiency Plan Consistency Statements and Agency Review Comments Distribution Improvements Projects List Water System Plan Submittal Form Systems 08200R and 082734 11) SYSTEM NAME 2) SYSTEM ID # 3) SYSTEM OWNER City of Bremerton 08200R and City of Bremerton 082734 OtfTACT NAME FOR VTIUTY PHONE NUMBER TITLE . .dthleen Cahall 360-473-2315 Water Resources Manaaer ADDRESS CITY STATE ZIP 3027 Olvmpus Drive Bremerton WA 98310 5) PROJECT ENGINEER PHONE NUMBER TITLE City of Bremerton ADDRESS CITY STATE ZIP Same 6. How many services are presently connected to the system? 16,469 for 08200R 63 for 082734 7. Is the system expanding? (seeking to extend service area or increase number of approved 0 Yes 0 connections) No 8. If number of services is expected to increase, how many new connections are proposed in the Number of connections next six years? is not known; however approximately 4,500 ERUs for 08200R and 750 ERUs for 082734 are forecasted 9. It the system is private-for-profrt, is it regulated by the State UTC? NJA 10. Is the system located in a Critical Water Supply Service Area? 0 Yes 0 No 11. Is the system a customer of a wholesale water purveyor? 0 Yes 0 No 12. Will the system be pursuing additional water rights from the Sate Department of Ecology in the 0 Yes 0 No next 10 years? 13. Is the system proposing a new intertie? 0 Yes 0 No 14. Do you have projects(s) currently under review by Department of Health? 0 Yes 0 No 15. Are you requesting distribution main project report and construction document submittal exception, and if so, does the WSP contain standard construction specifications for distribution 0 Yes 0 No mains? Are you requesting distribution related project report and construction document submittal exception, and if so, does the WSP contain distribution facilities design and construction 0 Yes 0 No standards, induding internal engineering review procedures? 17. Have you sent copies of the draft WSP to adjacent purveyors and the County for their review and 0 Yes 0 No comment? If yes, list adjacent utilities/entities that have received a copy of the draft WSP: City of Port Orchard, Erland Point Water Company, North Perry Avenue Water District, Puget Sound Naval Shipyard, Silverdale Water District, and Sunnyslope Water District 18. Is this plan an: o Initial Submittal o Revised Submittal Please enclose the following number of copies of the WSP: 2 copies for Department of Health Review 1 copy for Department of Ecology Review 3 Copies Mailed via UPS on July 24,2006 for Agency Review 2 Copies to be Mailed via UPS in January 2007 for Final Cit of Bremerton Water 5 stem Plan Checklist Chapter 1 Chllpter.2 Chapter 3 Cilapter4 ....... ChapterS: '. '~:,>:Chapteri;:' . :ictla.roe!i7 . . .Chap.t~r;8i ChaJiteri9 . Chaptili;1 0 Content Description DescriptionOfWllter' System ONnership and Management System History and Background Inventcxy of Existing Facilities Related Plans (e.g., CWSp, local land use plans) Service Area and Characteristics Agreement (signed in accordance with CWSP) Map Service Area Policies (Including SMA policy and conditions of seNice) Basic"PlannliJ'g}[)3ta :':.", "", Current Population. Number of Service Connections. and ERUs Current Watef Use and Data Reporting Current and Future Land Use Future Population and Number of Service Connections and ERUs (6 and 20 years) Future Water Use (Demand forecast for 6 and 20 years) !sy~emAiili.J~I~::.i:::.' ..j System Design Standards Water Quality Analysis System Inventory, Description and Analysis Source Treatment Storage []slribution SystemlHydraulics Summary of System Deficiencies *Must Be Submitted (.,I) Section inWSP (~ ) (,J) (,J) U) (,J) ( ) (,J) (,J) (,J) (,J) (,J) (,J) (,J) 1.1 1.4 1.5 2.2 1.6.2 1.6.1 Figure 1-4 1.7 .-'-'-- , . 2.3 and 24 2.4 2.1.3 Tables 2-2, 2-4, 2-5, and 2-6 Tables 2-4 and 2-6 .'," ,,' , '~~~, ~ 7.5 4 3 and 5 3 4 5.7 and 8.4 8 8.4.7 and Distribution List Appendix >' 'i~[ ,;r:_1~ (~) (,J) (,J) (,J) ( ) (,J) (,J) (,J) Analysis of Possible Improvement Projec1S i, .:COnS!l1Y:~t1fQ:P,i:ogra6i;ana;sou~lOfSup'P1YAnaIYsis' Conservation Program Water Right Assessment Source of Supply Analysis and evaluation of supply a~ematives Water Supply Reliability Analysis With Water Shortage Response Plan interties s<iuf?~1W}itei::l?r9.1@iC:>.6' ich<ldi 6he'oiB8lh) Wellhead Protection Program Watershed Control Program "J:,'dp~.:iiti,o.!.1!l!i1jj:M'iI!hielj'lIrr~~;~r99fiii1i'!. Water System Management and Personnel Operator Certification Routine Operating Procedures. Preventive Maintenance and Record Keeping Water Quality Sampling Procedunes (Compnehensive Monitoring Plan) Coliform Monttoring Plan. Emergency Response Program Safely Procedunes Cross-Gonnection Control Program Service Reliability in accordance with WAC 246-290-420 Customer Complaint Program Summary of 0 and M deficiencies '.Dis.llifl@.QIllli~~Ji!i~:Q~Tgii'aQd',GQ!I~~!>ij'~tan(jaids'.. Standard Construction Specification for Distribution Mains . Design and Construction Standards for distribution Related Projects and Internal Review ,\:, ';.~:-~Jm~tQ~:ffi:~m;.e!ggrllm:::J~f~~~~1M~f!ifl'XJl~j;E~'-~~:::.:- ;~/<~;~!t;(1~t:iT;'!":}H;!f~:;'~ j;: ';~:: "!~ ;~l ,,-' Capilallmprovement Schedule (6 and 20 years) Selection and Justification of Capital Improvements : :; ~;~i6~~~@~i~tiffii~~;~~~~~~11~~!~~i}~t~~/;;~:)~\~~:k;:~';,~A~ _;:i;-\;;r, '--~-: ',~-' Summary of past income and expenses Balanced Operating Budget (1 year if >1,000 connections /6 year if < 1,000 connections) Demonstration of revenue and cash flOW' stability to fund CIP and emergency improvements Rate Structure that considers aftordability of rates and water conservation Systems < 1,000 connections may do OOH Financial Viability Test to complete above reqs. UTC Rnanclal Viability and Feasibility Test (for UTC negulated systems) M'isc~ji~ni:9u~\D:oc;uni~~fi~~~:~,'::~P:{~;t_"~'i~~":\;~":.:~~:::k:j~'~~.ff.;?t[~,:;i.~{;':'o~' , ',. ": ~_;'O' ,.~ ' For COOim~;;itY'syst;;;s, iv1eei;;,g ;;j' the c,;~~r'ne';;' (<iaie ~nd de;;c~ptiOI1) County/Adjacent Utility Correspondence Documentation of Slate Environmental Policy Act (SEPA) Compliance Agreements Satellite Management ram . ";\i!_ir,\~~li:::~ _f' ( ) 4.4.7 and enclosed 6.1.2 6.2 4 and enclosed separate document (,J) (,J) (,J) (,J) ( ) 6.13 6.9 6.8 3.10 6.7 document 9 ',', :-:;'~:-'o ',. ~~.):tiJ2:~'\';,;;:-i..'.~' Scheduled Nov. '06 Appendix Appendix 1.6.1 N/A MUlll\...yal Water Law Water System Plan/Small Water System Management Prol>-- ...il General Approval Checklist For each element, please identify where in your Water System Plan (WSP) or Small Water System Management Program (SWSMP) submittal the requirements of the Municipal Water Law identified in the column labeled "Element" are addressed. The" Application" column identifies the type of plan (WSP or SWSMP) and the size of system the element applies to. Addressed Application Element in plan in Documentation sections Attached indicated ,c' .:' > ",.'., " '" ",::""""?,, ':" , ;" The water rights self-assessment you have included in your WSP and SWSMP must be complete and must WSP and SWSMP adequately reflect your water right status. Please review your self-assessment for completeness, accuracy and All size systems consistency with your water rights. Section 3 YES If there are factors (i.e. supplemental, seasonal, etc.) to your water right that are not addressed in the self- assessment format, provide additional statements on how those factors affect your self-assessment. The system capacity analysis must incorporate the water right quantity parameters (QaQi) found in your water WSP and SWSMP rights self-assessment. Identify the number of connections, population served, and/or Equivalent Residential Units Section 8.2 YES All size systems (ERUs) that you are currently serving and identify your current instantaneous and annual water usage. Water use Section 3 demand should not exceed existing water right QaQi. The system capacity analysis must incorporate the water right quantity parameters (QaQi) found in your water WSP rights self-assessment. For a 6-year planning horizon, evaluate the number of connections, population served, Section 2 YES All size systems and/or Equivalent Residential Units (ERUs) that you are planning on serving, utilizing historical water usage and future population projections. Water usedemand projections should not exceed existing water right QaQi. " , : ,''c'':<: ,':, ,. ....' WSP and SWSMP Provide a map and description of the water system service area. The map must delineate your retail service area Figure 1-4 (existing and future) as well any other service area (existing and future) you wish to include in your water right YES All size systems place of use. Provide clear differentiation between the two boundaries. Section 1.6 WSP and SWSMP Provide a copy of the,land use map(s) for jurisdictions served by your system. Figure 2-2 YES All size svstems ,,' 'L ';"':''"'''', '/':',"". """: '";:,, C:-:',,\:, ""',,.,:' New language has been added to RCW 70.119 A, which states, ".. .municipal water suppliers shall continue to meet Water Use No current the existing conservation requirements of the department and shall continue to implement their current water WSP and SWSMP conservation programs." Efficiency conservation All size systems Describe what, if any, previous efforts will be discontinued. For discontinued efforts, identify why continuation of Plan is an efforts are Appendix anticipated to be these efforts would be ineffective or provide documentation that the discontinued program had a prescribed end discontinued date or savings level. WSP Must meet current conservation requirements. Please review the requirements (attached) and provide identification " " All size systems of where in your current WSP each of the elements is included. YES SWSMP Provide a completed Water Conservation Program (Element 14 of the SWSMP). N/A N/A All size systems Application WSP Systems serving 1000 or more connections WSP Systems serving 1000 or more connections WSP Systems with inchoate water rights serving 1000 or more connections WSP Systems with inchoate water rights serving 1000 or more connections ~R.e~cliiiji'~(t~V:I,at WSP Systems with greater than I 000 connections Element Describe the projects, technologies, and other cost-effective measures that comprise your water conservation program. Describe the improvements in the efficiency of water system use resulting from implementation of your water conservation program over the last six years. Provide a demand forecast for the next 6-years based on the water savings expected from the planned conservation measures. Provide a demand forecast for the next 6-years based on the water savings expected if implementing additional conservation measures that were considered cost-effective, including those that were not chosen to be implemented at this time. Exploring opportunities for water reclamation is an element of the Municipal Water Law that must be addressed in this plan Systems> 1000 Comiections must complete Attachment 9: Water Reclamation Checklist for Systems with 1,000 or more Connections or provide comparable documentation. Table 2 in the Water Use Efficiency Plan Table 2-4 in the Water System Plan Documentation Attached Water Use Efficiency Plan is in the Appendix YES YES See Reuse Checklist Bremerton is currently implementing all planned conservation measures and will be evaluating additional measures in response to the new upcoming conservation re ulations. YES Application WSP All size systems WSP or SWSMP All size systems WSP or SWSMP All size systems In Watershed Planning Process per RCW 90.82 Element Describe how your system responds to requests for new water service by providing: 1. The process for service requests, including timeframes 2. How you determine that your system's capacity is adequate to provide new water service (including sufficient water rights) 3. Conditions of a non-technical nature that may affect your ability to provide new water service (annexation procedures, water rights issues, local ordinances, etc.) 4. Your system's procedures for granting or requesting extensions of time during a water service related project, and describe your procedure for handling disputes and appeals when water service requests are denied Consistency with applicable adopted local plans, regulations and policies must be determined prior to plan . submittal. For each appropriate planning agency provide a completed "Consistency Statement Checklist" or analogous documentation. If your system is located in an area developing a watershed plan per RCW 90.82, describe your efforts to coordinate with the local planning unit. We have attached a list of Water Resource Inventory Areas (WRIA) where watershed plans are currently in development along with contact names for each area. Documentation Attached Bremerton Municipal Code and related forms attached to this checklist N/A The City of Bremerton was an initiating government and an active participant in the WRIA 15 watershed planning process from 2000 until the process was halted by a veto of the Squaxin Island Tribe in June 2005. City of Bremerton 2005 Water System Plan lter Reclamation Checklist for Systems with 1,000 or more Connections , The Municipal Water Supply - Efficiency Requirements Act, Chapter 5, Laws of2003 (Municipal Water Law), amended Chapter 90.46 of the Revised Code of Washington (RCW) to require public water systems serving 1000 or more connections to evaluate opportunities for reclaimed water when completing their water system plans (WSP). This checklist may be used to ensure that your WSP includes sufficient information about opportunities for reclaimed water and your system's efforts to develop those opportunities. Water System Name: City of Bremerton Main System and West 517 Pressure Zone Date: July 2006 PWS ID: 08200R and 082734 1. An evaluation of water reclamation opportunities is found in the WSP on pages: 3-24 At a minimum, include the following in your evaluation of reclamation opportunities: . An inventory of large water users. . Identification of potential reclaimed water users. . Estimates of how much water could be saved by development of reclaimed water projects . Identification of opportunities that your system intends to pursue within the next six years . A brief analysis ofthe financial and operation feasibility of identified opportunities The form on the opposite side of this page is provided to assist you in conducting an inventory of potential users and estimate savings. Use of this form is optional. The City of Bremerton completed a "Water Reuse Feasibility Study" in 1998. A copy of this document is enclosed. The City of Bremerton was involved in the WRIA 15 watershed planning process which also evaluated reuse opportunities. As an extension of the WRIA process, Bremerton was also involved in the "WISER Water" (Wetland, Irrigation, Stream Enhancement, Recharge--water recycling) project. A thorough evaluation of reuse opportunities at Kitsap County wastewater treatment plants was conducted; however, Bremerton was not one of the top candidates selected for further funding. A copy of the final documentation has been requested and will be forwarded as soon as it is received. Form From DOH March 2004 Revision 2. Provide the results of that evaluation. Ifnew or additional reclaimed water opportunities are available, include a brief description of activities you are considering undertaking or those activities you will undertake to pursue development of those opportunities. If reclaimed water opportunities are not available, include a brief description of the interaction with the local wastewater facility (or other entity within the area you serve that may be a generator of reclaimed water) to evaluate opportunities to develop reclaimed water. Please see enclosed reuse feasibility study. The reuse section of the City of Bremerton Water System Plan states: The City owns and operates a secondary wastewater treatment plant (WWTP) with an average flow of about 6.2 MGD which could potentially be reclaimed after further filtration. Water reuse is the beneficial use of reclaimed wastewater treatment plant effluent in compliance with Washington Departments of Ecology and Health regulations. Bremerton's WWTP currently uses reclaimed secondary wastewater effluent for process control, odor control, and to irrigate inside the WWTP grounds and at a neighboring business. Approximately 150 gpm is used for in-plant uses and an additional 120 gpm are used in the summer months for an annual total of 88 MG/year. A "Water Reuse Feasibility Study" completed in 1998 identified the potential demands for and costs to provide additional reclaimed water to potential users in the Bremerton area. Bremerton's wastewater has higher than average saltwater from collection system infiltration and Puget Sound Naval Shipyard inflow making reuse possibilities challenging. A 2005 County-wide reuse study indicated that Bremerton had the least potential for large-scale reuse and recommended grant funding be focused at other locations with more feasible reuse opportunities. The City is currently evaluating the next step to take in reuse. 3. If evaluation of water reclamation is not included because such an evaluation has been completed by the wastewater facility, or other entity, please include a copy of that evaluation. N/A see answers above 4. If water reclamation is mandated for this water system through local government agreement, contract, local regulations, ordinances, or other mechanism, please provide a copy of the governing mechanism. N/A Form From DOH March 2004 Revision 5. Ifreclaimed is available within the service area of your water system please include the following information: Name of Facility City of Bremerton Wastewater Treatment Plant Class of Water Received (A, B, C or D) C Reclamation Permit Number N/A Approximately 150 gpm is used for in- Amount of Reclaimed Water received plant uses and an additional 120 gpm are used in the summer months for an annual total of 88 MG/year. Bremerton's WWTP currently uses A brief description of how this water is used, reclaimed secondary wastewater effluent including information on cross connection for process control, odor control, and to control irrigate inside the WWTP grounds and at a neiQhborinQ business. Date when your utility began receiving reclaimed 1987 (for in-plant use) water .~(),"-rna~: BIJlk!!S. and.!'llJ~~~f19_. Form From DOH March 2004 Revision . / lfl~ H;;~Tih V;ldsu1ff "r CI,rilvllfm~,,'nl '1,"11111, O.!Jin'iftJri,lIj".': \\'.u~'T RETURN TO: Southwest Re ional Office PO Box 47823 01 m la WA 98504 ~6~f,@I~f@~lYj:6:P.1~~i~~1s~~~~~~~;~~~~~i~~i1iji~~~l~ ~~fffQ:OuNFt~~~i~~~tz~y~~,fu?j~ BREMERTON, CITY OF KITSAP WATER FACiliTIES INVENTORY (WFI) FORMU~~~:;~7I1912006 ONE FORM PER SYSTEM Printed: 1011812006 WFI Printed For. On-demand Submission Reason:Annual Update 1~~RiiI~~t:l:'Qfft~s--.t~1r1\s;~~I8~g~i~g,[g~cfi~~:~f~TI~1~Wl~t"f3~l!~I1?:i1liIt~~J'R~~1~~j(~l[G:~~~MKs"~j~:WJI~~~w;I~;Nlfffit~E:OP_O_62~AK~~0 KATHLEEN M. CAHALL [MANAGER] 3027 OL YMPUS DR BREMERTON, WA 98310 BREMERTON, CITY OF KATHLEEN M. CAHALL 3027 OL YMPUS DR BREMERTON, WA9B310 TITLE: MANAGER fStREEtiAlJ"DRES-s'IRi:iitF.ERENt:'FR6M'ABOVE",'i7k:';'Iff2~'S';:-:~.iOjC::;;,2.s~j5j;f~+i f:STRffi;AOljRE'SsIE[rIFF.EROO7FR6;.r;AB6VE~Jtf~s@i;;:&0:~~J'''~;-'':4;"?'i'fYi";;'c'iti ATTN ATTN ADDRESS ADDRESS cm STATE ZIP CITY STATE ZIP t~;M~tl'9M&BXPMRX{,oN'I~gf{1Bfg8!MJ.JQ~.t~~~~w~~~~~j:1.1f~';RfiBl;f~}~,~J~ ftQii9iN~Jj;QgRi~fflt!f;9~nQ~t~~~~i~~}!t~~~~~~~r2ift.~~~iif~~i~ Primary Contact Daytime Phone: (360)473-2315 Owner Daytime Phone: (360) 473-2315 Primary Contact Mobile/Ceil Phone: Primary Contact Evening Phonll: (360) 478-2847 EoJlIlIlI: kathleen:cahall@ci.bremerton.wa.us Owner Mobile/Ceil Phone: Owner Evening Phone: (360) 478-2847 E-mail: kathleen.cahall@ci.bremerton.wa:us S1;;1~~t~:rrg[~~~~<~~IffiG'ENCY.{tSMA~cii~~f@)Jjifi!ili!)~ili1~[~~~~~*~~i~~lt~~~I~~ii~;:~~~~4~t~01~'3!Iift~~~f~~~ i[ Not applfcable (Skip to #12) o Owned and Managed o Managed Only DOwned Onl ~!Th~~~,~J.~~1f~ "';...~.=~=~_.~ .- SMA NAME: ~.2}t:~A~~i~1:OCs@~i~lsjl.s~1~rt@'UJhsf~p.e.IY)tt~i~3Jf~~~~~~~~Tb~F1;:~fliij~~~~~1~j\tf~t~-!8~if:#1~J:~~~Al~f:I~~~~~i\%~~fi;~~~~~ OAgricullural l8( HospftaUCnnlc RResldenUal lilCommerclal 1 Business l8( Industrial .chooJ liloay Care l8( Licensed ResldenUal FaclBly OTemporary Farm Worker ~ood Servlce/Food Permit lil Lodging l8(Other (church, fire SIaUon, elc.): 01.000 or more pelSOn event for 2 or more days puryear i[ Recreallonall RV Park ~1~ilVl.~1~~!~[[~,pwN~itsHfel!!1~Crli;?niiEn!~1:'b%1t\~:W~)jIf,~~r~~#.~~~~J;~~~~~~mf!~~~{~rf~~-[~~ir~~i~~f li4li:~!~GEJ~fACITYdi!'1n~~~~ DAssocfallon 0 County 0 Investor 0 Special Dlslrict lilcily I Town 0 Federal 0 Privata o State 32,030,000 ... SEE NEXT PAGE FOR A COMPLETE LIST OF SOURCES -- DOH 331-011 (Rev. 06103) Sentry DOH Water System Copy Page: WATER FACiliTIES INVENTORY (WFI) FORM ~ Continued k,~_.J!!3i~;NO~ ~1i~y~K@]:~~U~~~~Tfi0~4-~ib~i'$Ji~r~~~~~f)%~i~ ~~iicJ:li).NfitH~~~~::~~~~~~~~~] ~~,g0820mR .-= BREMERTON CITY OF KITSAP .~'~-:-!-"'--:'.---'~'~--""'" , - " .. - - --- ::~l~Ef-1i';~ ll~_ - - :w12i~ ~~~~~t ~15~ ~i~~':'l11: ~ -~~j~v,:"c U8CE' -::.:...:.:;::: JiERffj' L~~souliliE'tocA '--~' -- i ,;::,":". ,~:-:-:; - ;:.~.:: ;.-~~;- ::1.;.-:' ~..;;c; ~ I:::~ ;-;'.1;:-,: 1,,'1;.::;; .-:-.:..!: II i~ .~~:-..~ ~ :::>;; <;:..,:.: Q:l- i=:- ....":':..; :'1:::": i:"-= =~-: ~, ;;::: ~":;':"1 fT:i' f~ ;-::..-:=.\ ~::?:. 1iil ~2.' ;!:! -;:U;; ::;z::, ~~.~~- i~ ffts. ;~'. :(!I !~ :;::,..,~ H5i 8 '::Z: :X;;:. 7;>"-;";' ::;~;:,";T. a.:=;; :..~> ;n: ,(!I [Iii ~ ~~ ~#r 70""':::: r.-.;:.t; ;~w :,"".r."." ;0 ~~ ~ ;0 ~z ~g~ .:IL:" OF :z [~ ;~ ;.::.o;J :;In !~ .,:;;:: ~ ;%. ,0 ;-:;" i~ ;W 12!:: ~ffi f.i! ,2: ,0 ~ '0 ~ ra..~~ lU: 'W ~ ~. ~.oS~ C:c, ~ ;u 'z 16 !-w 'W, ~ Z:i2 ~~~ -~U: ~;!; ,!!I' ft!) ;< ~~. j~ il!) ~o: ~ii! 'Pi' !~ I~I ~~ !::i -~ iZ :;'% ~ 3. :.:u;; =z j~ ',0:: )15: ,Ui ~.9 i~ I~ ::W: ;~irl iii!: ,n: ,0:: !~ ,,~ :::z: ;0: ~w ~5 ;:r -...- -. .W "G;." ~~ ::'Q;" ~::>> ~i2' ;.)--: ~w ,.:1; '0. = i~i .if~ -.- ..- ,~ :~ t;;:- :w :0 :(1) ,.., '0 ;:a.: ::(1) ;:W :a:t. ~:z:: '.u ~u; ::u.: - . ::C/)~ - so:n UNION RIVER X X y X X 12500 SW NE 34 24N 01W 'SDZ WEST BRANCH UNION X X Y X X 4488 SW NE 34 24N 01W $03: UNION RIVER, EAST BRANCH X X X X 0 NW SW 35 24N 01W 'SOIf ANDERSON CREEK X X Y X 2250 NW SE 33 24N 01E 505 GORST CREEK X X X 1795 SW NW 32 24N 01E S06 WELL #1 No taa X X X 260 0 NW BE 33 24N 01E SOl WELL #2 MB908 . X X y X 273 750 NW BE 33 24N 01E ~SOBi WELL #3 MB915 X X Y X 316 480 NW SE 33 24N 01E 's69: WELL tt4 MB924 X X X 401 0 NW SE 33 24N 01E $111' WELL #5 MB925 X X X 550 0 NW BE 33 24N 01E $11\ WELL #6 Nolao X X X 535 0 NW SE 33 24N 01E S1~~ WELL #7 MB922 X X Y X 627 500 NE SW 33 24N 01E @fli WELl #8 MB909 X X y X 578 550 SE NE 33 24N 01E WELL#13 AAB902 X X Y X 273 510 NE SE 34 25N 01E '816 WELL #14 MB903 X X Y X 278 180 NE SE 34 25N 01E '816 WELL #9 AAB910 X X Y X 882 270 NE SE 22 25N 01E \$1% WELL #17 MB914 X X Y X X 293 725 SE SE 36 24N 01W ;$t8: InAcl 12101/1995 WELL #16-GOLF COUR X X X 400 125 NE NW 01 23N 01E :S19: InAct 0911212001 WELL#18-TWIN LKS R X X Y X 327 400 BE BE 35 24N 01W '820 InAct 0911212001 WELL #15 AAB913 ZO X X Y X 294 150 SE SE 36 24N 01W ;~al InAct 09/1212001 WELL #19 ZONE 517 X X y X 182 300 SE SW 36 24N 01W 822 WELL #20 AAB920 X X y X X 260 1150 SE SE 35 24N 01W 'S2j WELL #21 AAB901 X X y X 380 500 NE SW 36 24N 01W ;824' 082734 J BREMERTON WEST ZONE 517 08273 4 X Y X 850 SE SW 36 24N 01W DOH 33H)11 (Rev, 06103) Sentry DOH Water System Copy Page: 2 WATER FACiliTIES INVENTORY (WFI) FORM - Continued ....~'~..~._...c"....~1 ~j~~~~~it~a~~~2~~~~~i~~~#:~~~t~~f/i~f~~ ~~~~;rr~~:i[fl~i~lli~t~1~2~ r~f~'-- i5-0srij~ilE\FAMfGY~RE~(D~.N~~$lm~WIri~~y[oiJ@;follo,~~g!~~;Yo~Ifi'a.V'e7)~~~'9~i~~~;g{li"i4~~jf{;t A. FuU Time SlngIa Famlly ResldBllCes (Occupied 180 days or mete perysa!) B. Part Time Single Family Residences (OccupIed less /han 180 days per year) 0 i6~MJm:TJ:fAMlj}'fgE~JRE:NT~~J:lftP.lNJ3..s.1iHp.w;m~y;P.fit!1iftQnctWJ:n.~{~oWp:JJih~~~jl~;~~~~~~;Jfi~~~J.~~;;:~jis:';_~~ A. Apar1ment BulJdIngs. condos, duple~es. barraclls, dorms 1884 B. FuD Time Residential Unils In llIa Aparlmenls, Condos, DlIJlIexas, Dorms ihat are 0tCUp1ed more than 180 days/year 9288 c. Pail Time ResldenllaJ UnlIs In lhe Apartmenls. Condos, Duplexes, Donns lIIal are occupied /Bss than 190 days/)'aar 0 21J"'N_Q~R;S!P!;NI!A~~QN~E:_CJIQN$J(Howma!iYi9n!ii!1fol!9.W!ti!i}i:l.fi1@,Ii~v~1)5~l%]~ii:;".i~~tf,j~~\~~~:~i;'J~-'i:~:f~~~:+~;~ A. Recreational Servltes [Campsllils. RV Sites. Splgols, ele.) 0 B. lnslllullonal. CommeltlaVBuslness. School. Day Cara.lndlJslrial5elVices. ele. 1407 i';:;;:~~JA;la~;:toTA&S~RVjCi:\CONNEGTiONS~i;;~,t~;I . ".... ._____h . .__ ~~~~?J~~ttt~5~~:~~~ ~~~.~{~~~~~~;~ )j:gif;'~~14pjh~~~:i{ ~f~;~Jf~~}}ii ~~(\~;jf;23.1ir~~~~?~t. BY::'"'?~~~2~~tI~ f~J;[ID!~g~JIM1;!R!;~JDE.mJi'~l>f:Y1iAtJQN~~~t~t.~ii~~i~~Jj~J{~:\~~~~i!t~ A; How many residents are served by this system 180 or more days per year? Z~f11~~~!~~j-f.~f~~ffl~~f~~;~~1B~?J&t~~0:~~-:~~~~~ ~ot~Ff~lUcti~gj-~ESlIilEtf(i~ur~gRQ~tT9i!~iE~;~ ffi:'fJNl.}~ j;;:~EEB~ ~T'~S EfAP.Rg t4rM'Y~ ~~lJ~E ,,,i'JuEi@ ~fi.ij~~ ~~~~ ~Q(IT~ ~.N9R~ ~DEC)f; ::,..__ ~..~""n" ~:-.-'f.l;'~.- ~r.;.;:-~~ -.-- A. How many part-Urne residents are present each month? B. How marly days per month are they present? .. , .fEMRbRARYJ&~nwisiE'NTclisERs-~~i1~f:;;~{';S~1Ej ~j!YA'f~ ':'~.~.".. -::;".., ~MAR:1~ ~~~1~ ~MAY1?:i fHJONg ~i2flllu~ ,.;;::~- -' ~;TSEP J'f ~[~~ E1~~~~ ~h~}-] , ~~~~f.f ,,"'AUG~ ."-'-~~~~-' -- - _.._...__._-_...-.-._~-,.-.. ,. ." ._~~...."- ';-.{:;:;'!:'i.?o"~:': ';E!i'::--;~':;:0-; 'S.;:~r:~ ::.t::.:=.::.-:;:'-::-.-: u..~_~..._-. ~=r:.:':r.:.r.:' A. How marly lolal visitor.;. attendees, travelers, campers, pallen Is or customers have access to the waler system each month? B. How many days per month Is waler accessible to the public? ~ii~!i~&il~R1ijoN~~~sf.i5~'t~I(g~,Q:~~R~1~~~~~~~ ~;f;J,~;J E1[~~ t~~lr~ ~AP.R~5 \~,~~1~ ~{~_!lli~1 ~U~~1 ~@E,f~~ tJ~r~~ '-,,= QJ::J"~, ~!!9YZ:': ,"?-'DECiA -..._:'. - .,,- ::,::;--::.';':l'.~.. E~E~i'_~ A. II you have schools. daycares. or businesses conooc1ed to ~~urwaler system, hbw many students daycare ch ren and/or employees are present each month? B. How many days per month are they present? o Update - Change 0 Update. No Change 0 Inactivate 0 Re-Activate 0 Name Change 0 New System 0 other 36. I certify that the Information stated on this WFI form Is correct to the best of my knowledge. ~IGNATURE: DATE: .INT NAME: TITLE: DOH 331-011 (Rev. 06/03) Sentry DOH Water System Copy Page: 3 / / fI~ &~Tth Llii,.';nJln ft' Crrrinmmmrnl , k,JlJh DjJia uf Orl.H/J.t IVolh'T RETURN TO: Southwest Re lanai Office PO Box 47823 01 m la WA 98504 _'-~5Y5IEM:N'AME~~~~~~~~'!::f:-fitiff4'jf~}~~~~~~~;;ii~ i3~~cJ5JtNiti~1~~~~1.~~i[~~~ BREMERTON WEST 517 ZONE, CITY OF KITSAP WATER FACiliTIES INVENTORY (WFI) FORMU~~~:;~7I19n006 ONE FORM PER SYSTEM Prinled:07/26n006 WFI Printed For: On-demand SubmIssion Reason:AnnuaJ Update i~~~MftijYE1~,fIT~ST{N'~M~~!~~1tl~G~gp~~~J~Ki~1f:ff:~1idE~;~~f0~'~[~~( i.zf;9~],~S'~i~:~~1iNG~~~i~1Dt;~~I[a1~~E:~'~Wile.iiOQOp23'f~:ilii KATHLEEN M. CAHALL [MANAGER] 3027 OL YMPUS DR BREMERTON, WA 98310 BREMERTON, CITY OF KATHLEEN M. CAHALL 3027 OL YMPUS DR BREMERTON, WA 98310 TITlE: MANAGER FSrREET7ADDREssTF.tDiFFERENTlffioM]\BOVE;~E2&'-Eif*:~~~~~:~';j~{~?7.1s;~~ ;.siREErfJ'DDREsS:YF;i:JiFFEREN'nFR6;,,'Air6V81!~iiiiEfE~~ti\;E1Wb~f;j',-;;:::'SIa0~~ ATIN ATIN ADDRESS 3010 MARINE DRIVE ADDRESS CITY BREMERTON STATE WA ZIP 98312-2038 CITY STATE ZIP ~~Jf24:'HQ!!Blfi~~Y[C:()ttre;C~~E((R.fMT!g~~~~;t~~~~~~?~Lit,j~P!ttb1~(~;Zf"~fJ ~1:Q~iQWN:f~~Q.rf:(8~tUAF,()~IrQ.~fjL~~~~~i~f;!:~~~~~l~~~~fI~~~4~Ii~(~ Primary Contact DayUme Phone: (360) 473-2315 Owner DayUmePhane: (360) 473-2315 Primary Contact Mobile/Ceil Phone: Primary Contact Evening Phone: (360) 478-2847 E.mall: kathleen.cahall@ci.bremerton.wa.us Owner Mobile/Ceil Phone: Owner EvenIng Phone: (360) 478-2847 E-mail: kalhleen.cahall@cLbremerton.wa.us ~t!~SA~~MAN~~~tm~i[ENcw:SPM;(~k~wpJIfYk~~HJttf~~;;;:~;~~'!:I~~tf.;~>~~~~1~~~~}f1~~;;~7~~~~~~f,~fI;~!l~~J.F.~iij~1~ llI!II. Not applicable (Skip 10 #12) o Owned and Managed SMA NAME: m~tt~3:~l~%jk~iI~l o Managed Only DOwned Onlv ~~iWki;E[{j~:Wb1ri.H~~~~I~"!C.~f{~Ai,;i;]lli[f~prily.}ii~!~~~&~i€~~~~f~~~~j'R~~~;J~,t{1f~~~~~~~%~~~~rill~fj~~~"j~}~~ DAgricuhural 0 Hospital/ClinIc .esldenlial Iil:Commerclal/ BusIness iii: InduslIial DSchool DOay Care 0 licensed ResldenUal Faclfity DTemporalY Fann Worker .ood SeJVlcelFood Pennll 0 lodging lilOther (church, lire station, etc.): D 1,000 or more person event for 2 or more days per year 0 Recreational/ RV Parll ~1~~W~.T.t:R~r~tEM~QWi.i.~R~~jP]{m~'~fl&:pn.e}~~~fI~'f,t~~r4~~~~~t1iKT0fill.~~!J&ifriilli?~~l3.i~:llif~~4~: ~t4!.~SICrf~f."GE~f~C~jfY~~iifnID~~~J DAssoclaUon 0 Counly 0 Investor o Special DlsIrlcl li{CIIy/Town 0 Federal 0 Prlvala o Stale SD1I. 820 WEll #15 AAB913 SPLIT- 08200 X Y X 36 24N 01W InAct 09/12/2001 S19 WELL #18 MB921 X y X 35 24N 01W SU;f S21 WEll #19 MB919 SPLIT - 08200 X Y X 36 24N 01W S04~ 08200R 1 BREMERTON 08200 R X Y X 36 24N 01W S051 WELL18RAEC924 REPLACED 802 X X Y X 164 35 24N 01W DOH 331-011 (Rev. 06/03) Sentry DOH Water System Copy Page: 1 WATER FACiliTIES INVENTORY (WFI) FORM - Continued --. - gr2~~siSTE.M~~~~i~~f~1H~:it~~i:i~li~~~~~~~ ~~sfoutii;f;Ii~~~~~~~~Jlit~i:=S"2S BREMERTON WEST 517 ZONE, CITY OF KITSAP i5;~sIN~~~fM1fi;"'(fR~&rQ~N_qE$I(f!Ow:m.lID'fofffi~f~]i~~ri'!i[i1~VQ~;_~:a;v~1};~;f~~_~~~'~~~;i-:;,~'~i~:;:g~~;Ii( A. Fun IIlIHI SiIIgla FamUy Residences (Occupied 180 days Dr I1lIl/li!peI yearl B. Part lima Slnglll Family Resldellt8S (OccupIed less /h8nl80 days per year} 0 ~~~M@'ti4fAMi~YiRE.:siJ:)EN.J~~8PI~PINi3_st(Howjli~ntQHh~fPlh~Wiljgti!o;y'~IJ~If~v~ll[f:'\\=%f!~BK~;t:s~;~~;~E'~~H~;;;;~~~f~}.l A. Apartmenl BuUdlngs, condos, duplexes, barracks. dorms 0 B. Fun T1me ResldenUaI Units In ilia Apartments, Condos, DupIexa5, llorms ilia! are oa:upled /IlOIB than laD daysJyear 0 c. Part Tlma Res1danllal Units In the Apar1m5llts, Condos. DuplllJ(es. Dorms thai ilI1lllCClfll1ed lass /h8n IBD dayslyear 0 ~7~NQN~RESJpENt~i;.cQffNg~J1Q~~{BowJTI@!JiQH!!.ejti!n{jM!1gT!!OlY~~1b:a.v~1)~f;~f:~t:F~~~~~~:Sc",~~L.~~-B~i~ff.'~ A. ReclB!lllonal SeJV1ces (Campslles, RV Sites, Spigots. etc.} 0 B. lnstilu11onal, CommerclallBuslness, Scliool, Day cae, Induslrlal SeJV1ces, elc. 61 2~1~t~~o~~~~ ~~~~~;;i1~ ~~=f~.6~~!f!jb~ ~~i~~~~~~~l~ f'i);;I;~~~:~8~totAt"SERVfCErct5NNECTI(fNSE;;:;'{;~;k ,f:7_~:~Ii63gj,,:-':~ili' ~t[iilJ.illitrJME~Re$)RJ~NTIAfrrliQB9c@;I'O~~~it0~~~,zfl~~~r1i8I;t~"B(~j1f.~Thl~'f~i.~i~Xt.~e!b~1y.Il~~~~:ifz1f0lif~{1~%~rt~~i{~~ffiqt0iffii~Z~ A. Hew many resldenls are selVed by this system 180 Dr more days peryear7 . . 5 ;firi:fP-ART;iiME;RESIDENI1A~I!OP-UE6.TIOPt:~i'~'; ~i.!-',IAN~'2 ~';EE~g ~MAl!~ ;;:=.gB~ .~~~r~ ~~'@~ s;,~uG;c;; =~_AUG,,;o :;:. "l. ~o.CT.-ii~ ?t~OV@ :;'.,;DEC~;; .",;,SEP..<:~ E . ..-.::;. _ ''';.: ;. :: .. -;...::.... ~.:;_ '."_;,.~ .:..!:::p':::;:Z~f~1 -~" .".-.. .,,-~ ....--. . .. A. How parHlme residents ere present each month? . many B. How many days per month are they present? }r;Ml@,MR~~rr~N~I~Ju.sERS'i@.fu"'2~~Ji ~~~~~ ~@!l~ .... ~. ~.::"~O:: ~~~,~; ~~y~ WI~ilJ~~ t'fc:JuiIfg; tfAUGi'ili ~t~gft~ i-~OCJg; ~NoVb:~ ~~~!~~ ;t"'.DEC;;;;~ ~:~~";-";J"'7":"'=:':: ~~"~.IE A- How many tolal vlstlors, attendees, travelers, campers, paUenls or customers have access to !he water system each month? B. How many days per month Is water accesslbla to the publIc? ~~B~~!J~R\~QN;~SlDi;NttJigQ~ER~~g:;M~~~~~ ". ... -~.. .'~ ~...:~-...,.:r.-',,; ._':>'........-;:.1;:"";::: ~~~ ~@~~~~ g.~WIii~ ......_;:....--::.;T..' "'.~~.-_::.:-=;::.. go'~ .-.=v= ?Jl_ECj~ "",,'JAtj "," f~.~':~ 'i!,MAR;Ii,~ ~,~~,E~ :3f,AUG "" ~(!;!L-~ \f~-'t9:gs ':;:':.~2'~,;,; =~~..- -'-.-r:.,.,,-=''':- A- If you have schools. daycares, or busInesses connected 400 400 400 400 400 400 400 400 400 400 400 400 ~~8ur water system, hOw many students daycare I ren and/or emplOyees are presenl each month? B. How many days per month are they present? 22 22 22 22 22 22 22 22 22 22 22 22 o Update. Change 0 Update. No Change 0 Inactivate 0 R~Activate 0 Name Change 0 New System 0 Other 36. I certify that the information stated on this WFI form 15 correct to the best of my knowledge. SIGNATURE: DATE: I .lNT NAME: TITLE: DOH 331-011 (Rev. 06/03) Senliy DOH Water System Copy Page: 2 City of Bremerton Department of Public Works & Utilities 3027 Olympus Drive Bremerton, WA 98310-4799 www.ci.bremerton.wa.us ." . .. . Printed on recycled paper ~.+i ( '- ,'f~;,,'__ ,,'..d .~-r: ~_ f~~~><~~.:~:~"->~rLi~~i\~ :,; Forbillinginf~rmatibncall4 73,-5:3'16. 'Fcirfl'hshing 'I nstr6dions'ca"u oLi r Water Hotline at473-549Q. Visit the City's website at. www.ci.bremerton.wa.us Drinking Water Quality Report 2005 Celebrate National Drinking Water Week May 1 - 7,2005 Call 473-5920 for more information. Bremerton Drinking Water Quality is Excellent The City of Bremerton Water Utility is pleased to provide you with its annual water quality report and proud that your water continues to be of the highest quality. The City is committed to safeguarding its surface and groundwater sources. This brochure summarizes the test results for water provided to over 50,000 customers last year and is a record reflecting the commitment of Water Utility employees to deliver you excellent quality water. Included are details about: . where your water comes from, . what it contains, and . how it compares to standards set by regulatory agencies. Safe drinking water is essential for our citizens who need to be well-informed to wisely utilize and conserve water resources and to support the improvements necessary to maintain the highest quality drinking water possible. Protecting Our Water Supplies Surface water from the Union River All. Reservoir and groundwater from . I . production wells located in the Bremerton N area provide the supply for Bremerton's water. All sources are managed in accordance with Washington State Department of Health and Federal Environmental Protection Agency (EPA) regulations and best management practices for water supply systems. Bremerton owns and protects the 3,000 acre watershed surrounding the Union River supply. Access to the watershed is secured, patrolled, and limited to water supply and forestry management activities. Each year the Washington State Department of Health inspects the surface supply. Groundwater wells are also safeguarded through efforts to protect critical areas around the wellheads. All waterfacilities are monitored and patrolled. 1~1 BremellOll Water Service Area -...;. Roads Bremerton Water Needs Minimal Treatment Bremerton's water system is operated and maintained by experienced personnel and certified by the State. The Washington State Department of Health determined Bremerton's Union River water source to be of such good quality that the City is not required to install a filtration facility as long as all water quality, operational, and watershed protection requirements are met. Bremerton consistently meets these quality stan- dards. Treatment of Bremerton's water currently consists of chlorine to control microbes that might be present in the water and sodium hydroxide for corrosion control. Corrosion treatment is required to prevent Bremerton's water from leaching lead from customer's household plumbing. Sampling results confirm this treatment is successful in achieving corrosion control. The City of Bremerton performs systematic flushing of the water distribution system. Customers are notified about fluship'" through newspaper ads and neighborhood signs. Flushing is a process of sending a rapid flow of water through the mail "-. to clean them. This helps to maintain water quality by removing sediment. Flushing may cause a temporary discoloration to your water. While this discoloration is unpleasant, it is not harmful. If this happens, wait thirty to sixty minutes. Then turn on your cold water and let it run for one to two minutes. If your water does not clear up after this process, please call the Customer Response Line at 473-5920. Information From EPA Sources of drinking water (both tap and bottled water) include rivers, reservoirs, springs, and wells. As water travels over the surface of the land or through the ground, it dissolves naturally-occurring minerals and, in some cases, radioactive materials and can pick up substances resulting from the presence of animal or human activity. Contaminants that may be present in source water are microbes, pesticides, herbicides, organic and inorganic chemicals, and radioactive materials. To ensure tap water is safe to drink, the Environmental Protection Agency (EPA) prescribes regulations limiting the amount of certain contaminants in water provided by public water systems. Drinking water, including bottled water, may reasOnably be expected to cOntain at least small amounts of some contaminants. The presence of contaminants does not necessarily indicate that water poses a health risk. More information about contaminants and potential health effects can be obtained by calling the EPA's Safe Drinking Water Hotline at 1-800-426-4791. Some people may be more vulnerable to contaminants in drinking water than the general population. Immuno-compromised persons, such as those undergoing chemotherapy, persons who have undergone organ transplants, people with HIV/AIDS or other immune system disorders, some elderly, and infants, can be particularly at risk from infections. These people should seek advice about drinking water from their health care providers. EPA guidelines on appropriate means to lessen risk of infection by Cryptosporidium and other microbial contaminants are available from the Safe Drinking Water Hotline at 1-800-426-4791. Please note that Bremerton has tested for Cryptosporidium since 1994 and has never detected this organism in the water source. / ' ( " Bremerton Water is a Great Value Your water rates pay for delivering high-quality water to your tap and keeping the water system in top con- dition. Bremerton customers pay water rates among the lowest in Washington State. Ho~ to Use Water Wisely Bremerton's water supplies are dependent on rainfall to fill the reservoir and feed underground aquifers. Wise water use is always recommended, and your conservation efforts are important. Improve your home's water efficiency - use water wisely to save money and this remarkable resource. Typical Household Indoor Water Use Dishwasher 3% Tackle the biggest water guzzlers first! . Install low flow toilets. . Consider purchasing a water/energy efficient clothes washer. . Repair leaky toilets and faucets. . Use water-saving habits such as washing full loads only. Turn off the faucet when you shave or brush your teeth, and take shorter showers. . Install low flow showerheads. Toilet leaks 5% Showers 21% Nearly one-third of the water demand in the summer is for irrigation. . Water late in the evening or early in the morning. . Consider drought tolerant plants or native plants in your landscape. Use soaker hoses or install drip irrigation. . Repair broken irrigation system sprinkler heads. I \ . Water lawns no more than 1 inch per week using a shallow can to measure. . Install a rainwater collection barrel. For information about water conservation, visit www.ci.bremerton.wa.us or call 473-5920. Visit our water conservation demonstration garden and rain barrel at 3027 Olympus Drive. ~:~ y~ ,'.' Turbidity pH Total coliform Disinfection by-products Frequincy' Continuous monitoring Continuous monitoring Continuous monitoring Weekly Quarterly Inorganic chemicals Volatile organic compounds Radionuclides F ~e qti~i1'c y' Twice a year Annually Annually Every 3 years EX.ery 4 years Presence of coliform in less than 5% of 2.7% o - 2.7% 0 Yes monthly samples By-product of 80 ppb 39.6 ppb average 11.9 - 72.6 ppb N/A drinking water Yes chlorination By-product of 60 ppb 24.5 ppb average 0- 39.1 ppb N/A drinking water Yes chlorination 4 ppm 0.79 ppm 0.62 - 1.00 ppm 4ppm Yes PPlnis parts per'million (equivalent to olle pennyin $10,000). , ppb is parts per billion (equivalent to one penny in $10,000,000). , Action level is the concentration of contaminant that, if exceeded, triggers treatment or other requirements a water system must follow. Ninety percent (90%) of all samples must be below this amount. MClG (Maximum Contaminant level Goal) is the level of a contaminant in drinking water below which no known or expected risk to health exists. MCLGs allow for a margin of safety. MCl (Maximum Cbntaminant level) is the highest level of a contaminant that is allowed in drinking water. MCLs are set as close to the MCLGs as feasible using the best available treatment technology. N/A means not applicable. NTU (Nephelometric Turbidity Unit) is the measurement of water clarity. Monitoring turbidity is a good indicator of water quality. Treatment Technique is a required process intended to reduce the level of a contaminant. Bremerton's surface supply is shut off when turbidity increases above set points. City of Bremerton Department of Public Works and Utilities DETERMINATION OF NONSIGNIFICANCE PROPOSAL: City of Bremerton 2005 Water System Plan Update - Review of water records, population projections, water service area boundaries, and construction standards. A hydraulic analysis of the water system and' an evaluation of ~e water quality, recommendations for system and operational improvements, such as adding, repairing, or replacing transmission and distribution mains, storage reservoirs, pump stations, and other componerrL5. PROPONENT: City of Bremerton Department of Public Works and Utilities LEAD AGENCY: City of Bremerton Department of Public Works and Utilities The water plan encompasses the City of Bremerton and unincorporated areas surrounding the City limits. Townships 23,24,25 North, R 1E and 1W, W.M. in Kitsap County, The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment An environmental impact statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the .Iead agency. This information is available to the public on request. LOCATION: This Determination of Non-significance (DNS) is Issued pursuant to WAC 197-11-340(2). The lead agency will not act on this proposal for 14 days from the Date of Issuance below. RESPONSIBLE OFFICIAL: Phil Williams. Director Department of Public Works and Utilities City of Bremerton 3027 Olympus Drive Bremerton, WA 98310 5T AFF CONTACT: DATE OF ISSUE: COMMENT DEADLINE: a;~ Phil Williams. ResponsibleOfficial Kathleen Cahall. (360) 473-2315 July 28, 2006 July 11 J 2006 July 21 J 2006 NOTE: Pursuant to RCW 4321 C.075 and City of 8remerton environmental regulations (BMC Chapter 20.04.200{e), decisions of the Responsible Official may be appealed. Appeals must be filed with the appropriate fees at the Department of Community Development located at 345 Sixth Street, Bremerton. Washington 98337. Appeals must be filed by the date indicated above as "Appeal Deadline." If you appeal, you should be prepared to make specific factual objections. NOTE: The issuance of this DNS does not constitute project approval. The applicant must comply with all other applicable requirements of the City of Bremertan and the Slale of Washington. SEP A CHECKLIST A. Background 1. Name of proposed project, if applicable: 2005 City of Bremerton Water System Plan Update 2. Name of applicant: City of Bremerton Department of Public Works and Utilities 3. Address and phone number of applicant and contact person: Kathleen Cahall Water Resources Manager Public Works and Utilities 3027 Olympus Drive Bremerton, WA 98310 360-473-2315 4. Date checklist prepared: July 19, 2006 5. Agency requesting checklist: City of Bremerton, Department of Public Works and Utilities 6. Proposed timing or schedule (including phasing, if applicable): The Water System Plan (WSP) evaluates the existing water system and projects future needs to the year 2024. This plan is required to be updated every six years. The final WSP will be submitted to the Washington State Department of Health in December 2006. 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. This document is such a plan and outlines proposed water transmission and distribution extensions and improvements, pressure zones, reservoirs, and pump stations. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. Page 1 of 15 SEPA Checklist 2005 Bremerton Water System Plan This non-project SEPA checklist has been completed for general impacts associated with this plan. Subsequent specific construction projects to implement the plan will be subject to specific environmental review as required under the State Environmental Policy Act. The City of Bremerton and Kitsap County Comprehensive Plan and the Kitsap County Coordinated Water System Plan also relate to this Water System Plan. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. Zoning and development changes within and adjacent to Bremerton's water service area can affect this plan. 10. List any government approvals or permits that will be needed for your proposal, ifknown. Water System Plan approval - Washington State Department of Health Water System Plan adoption - Bremertori City. Council 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include. additional specific information on project description.) The City of Bremerton 2005 Water System Plan Update includes a review of water records, population projections, water service area boundaries, and construction standards. A hydraulic analysis of the water system and an evaluation of the water quality are also included in the plan, along with recommendations for system and operational improvements. Recommended improvements generally consist of adding, repairing, or replacing transmission and distribution mains, storage reservoirs, pump stations, and other system components, as listed in Section 9 of the plan. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, ifknown. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The water plan encompasses the City of Bremerton and unincorporated areas surrounding the City limits. The planning area is located in Townships 23, 24, and 25 north, Ranges 1 east and 1 west, W.M. in Kitsap County, WA. The water service area boundary is shown in Section 1 of the plan. Page 2 of 15 SEPA Checklist 2005 Bremerton Water System Plan B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other vanes: Low rolling hills and inlets ranging from sea level to 700 feet in elevation. b. What is the steepest slope on the site (approximate percent slope)? Unknown, slope of area varies. c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. The soil types vary throughout the approximate 13,800 acre water service area. d. Are there surface indications ot history of unstable soils in the immediate vicinity? If so, describe. N/A e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. Although exact locations and quantities of fill are not known, some grading and filling would occur during pipeline replacement and other proposed construction projects. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. Some minor erosion may occur during a pipeline replacement and other construction projects. g. About what percent of the site will be covered with impervious surfaces after proj ect construction (for example, asphalt or buildings)? None, during pipeline replacement and other construction projects the existing surface will be replaced with the same material. Page 3 of 15 SEPA Checklist 2005 Bremerton Water System Plan h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Best management practices for erosion control will be used, such as hydroseeding, filter fabric fences, and other techniques will be used to control potential erosion during construction of recommended improvements. 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. Dust and some vehicle emissions will be generated during construction of recommended improvements. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. No c. Proposed measures to reduce or control emissions or other impacts to air, if any: Construction dust can be controlled by watering disturbed areas. 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. Within the Bremerton water service area, marine waters include: Dyes Inlet, Port Washington Narrows, Chico Bay, Ostrich Bay, Oyster Bay, Mud Bay, Phinney Bay, and Sinclair Inlet. Fresh waters include: Kitsap Lake, Alexander Lake, Heins Lake, Jarstad Lake, Union River, Heins Creek, Anderson Creek, Gorst Creek, and several other smaller creeks and ponds; 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Page 4 of 15 SEPA Checklist 2005 Bremerton Water System Plan Although the majority of construction would be within urbanized areas, the 36" transmission main replacement from McKenna Falls will cross Gorst Creek. 3) Estimate the amount offill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. Transmission main alignments to backfill trenches will avoid wetlands. If wetlands cannot be avoided, design and mitigation will be on a case-by-case basis. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities ifknown. There are no new surface water withdrawals outside of existing City water rights planned as described in Section 3 of the Water System Plan. 5) Does the proposal lie within a 1 OO-yearfloodplain? If so, note location on the site plan. Portions of the planning area along Heins Creek, Gorst Creek, and Anderson Creek are within the 1 OO-year floodplain. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities ifknown. Ground water well improvement is included in this plan and applications for Well 9, Well 21, and Well 22 have been submitted the Department of Ecology. Well 9 is proposed to be improved to increase capacity. Other areas will be explored to locate new groundwater wells. . . 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals . . . ; agricultural; etc.). Describethe general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. None are anticipated. Page 5 of 15 SEPA Checklist 2005 Bremerton Water System Plan c. Water runoff (including stormwater): I) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. N/A 2) Could waste materials enter ground or surface waters? If so, generally describe. No d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: N/A 4. Plants a. Check or circle types of vegetation found on the site: l deciduous tree: alder, maple, aspen, other l evergreen tree: fir, cedar, pine, other X shrubs l grass l pasture crop or gram l wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other l water plants: water lily, eelgrass, milfoil, other X other types of vegetation b. What kind and amount of vegetation will be removed or altered? Small amounts of vegetation would be disturbed during construction projects. Construction will generally be within urbanized areas so vegetation alteration and removal will be minimal. . . . c. List threatened or endangered species known to be on or near the site. None known. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: None proposed. Page 6 of 15 SEPA Checklist 2005 Bremerton Water System Plan 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Answers are underlined vice strike out. birds: mammals: fish: hawk, heron, eagle, songbirds, other: deer, bear, elk, beaver, other: ba55, salmon, trout, herring, shellfish, other: b. List any threatened or endangered species known to be on or near the site. Summer chum on the Union River and Puget Sound chinook. McKenna falls serves as a natural barrier to anadromous fish migration. Several Bald Eagle sites nesting sites are documented in the City. Impacts to these and other endangered and threatened species would be evaluated at the project level. c. Is the site part of a migration route? If so, explain. Not known. d. Proposed measures to preserve or enhance wildlife, if any: Watershed control activities in the Union River watershed also preserve wildlife. 6. Energy and natural resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. The City of Bremerton currently uses diesel or electric energy to run its pump stations, treatment facilities, and automatic controls. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Page 7 of 15 SEPA Checklist 2005 Bremerton Water System Plan A water conservation plan is included in this plan. Reduction in water usage by Bremerton's water customers will decrease the amount of energy needed to pump and treat both water and the resulting wastewater. 7. Environmental health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. Chlorine is used in the treatment process in accordance with the City's Risk Management Plan for Chlorine. Methods of transporting and handling chlorine is included as part of the operations program in the plan. I) Describe special emergency services that might be required. An emergency response program is included in the operations program in the plan. 2) Proposed measures to reduce or control environmental health hazards, if any: Replacement of deteriorating and undersized pipelines and adding emergency operation components will increase the systems public safety value and reduce risk of public health hazards. A wellhead protection program is described in the plan to protect groundwater sources. A watershed control program will protect surface water sources. b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? None 2) What types and levels of noise would be created by or associated with the project on a short- term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would corne from the site. Short-term minor construction-related noise would occur during the day during construction hours; 3) Proposed measures to reduce or control noise impacts, if any: None needed. Page 8 of 15 SEPA Checklist 2005 Bremerton Water System Plan 8. Land and Shoreline use a. What is the current use of the site and adjacent properties? Land use within the planning area includes residential, commercial, light industrial, and the Puget Sound Naval Shipyard. b. Has the site been used for agriculture? If so, describe. Areas within the planning area used for agriculture is very minimal. Recommended construction projects are primarily within urban areas. c. Describe any structures on the site. N/A d. Will any structures be demolished? If so, what? None are planned. e. What is the current zoning classification of the site? Recommended construction projects will generally be within existing public right- of-ways. f. What is the current comprehensive plan designation of the site? Recommended construction projects will be within several designations, but primarily within commercial/urban designations. g. If applicable, what is the current shoreline master program designation of the site? N/A h. Has any part ofthe site been classified as an "environmentally sensitive" area? If so, specify. Impacts to areas identified as critical or sensitive areas - such as streams, wetlands, and wellhead protection areas - will be evaluated at the project level. i. Approximately how many people would reside or work in the completed project? Approximately 56,000 people are served by the Bremerton water system. j. Approximately how many people would the completed project displace? None Page 9 of 15 SEPA Checklist 2005 Bremerton Water System Plan k. Proposed measures to avoid or reduce displacement impacts, if any: None needed. 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: Implementation of plan recommendations would be subject to local planning review for compliance with land use compatibility. Population projections are consistent with the Growth Management Act planning. 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. None b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. None c. Proposed measures to reduce or control housing impacts, if any: None needed. 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? The tallest structures proposed in the Water System Plan are reservoirs which would be approximately 20 feet tall. b. What views in the immediate vicinity would be altered or obstructed? None-reservoir cOnstruction would be on Water Utility-oWned land. c. Proposed measures to reduce or control aesthetic impacts, if any: None needed. Page 10 of 15 SEPA Checklist 2005 Bremerton Water System Plan 11. Light and glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None b. Could light or glare from the finished project be a safety hazard or interfere with views? No c. What existing off-site sources oflight or glare may affect your proposal? None d. Proposed measures to reduce or control light and glare impacts, if any: None needed. 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? The planning area contains a large variety of recreational facilities and opportunities, such as parks, bays, and lakes. b. Would the proposed project displace any existing recreational uses? If so, describe. No c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None needed. 13. Historic and cultural preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. No b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None known at this time. Page 11 of 15 SEPA Checklist 2005 Bremerton Water System Plan c. Proposed measures to reduce or control impacts, if any: Such areas would be avoided or impacts mitigated if unavoidable. 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. Within the water service area are State Highways 3, 16, 303, 304, and 310, and numerous local and arterial streets. b. Is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? The water service area is served by Kitsap Transit and Washington State Ferries. c. How many parking spaces would the completed project have? How many would the project eliminate? N/A d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). New or replacement water lines will require restoration of any streets affected. e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No f. How many vehicular trips per day would be generated by the completed project? Ifknown, indicate when peak volumes would occur. . N/A g. Proposed measures to reduce or control transportation impacts, if any: None needed. 15. Public services Page 12 of 15 SEPA Checklist 2005 Bremerton Water System Plan a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. No b. Proposed measures to reduce or control direct impacts on public services, if any. The water plan includes many recommendations that will improve public services. Emergency water supply features and pipeline replacements will help ensure adequate and responsive service of domestic water and fire protection. 16. Utilities a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other. All listed services are generally available within the water service area. Approximately 80% of Bremerton water customers are on sewer with the remaining 20% relying on septic systems. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. N/A C. Signature The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Date Submitted: Page 13 of 15 SEPA Checklist 2005 Bremerton Water System Plan D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (do not use this sheet for project actions) Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise? If population increases as forecasted in the Water System Plan there will be an increase in water use and in discharge of wastewater and septic systems. None of the other items listed will be affected. Proposed measures to avoid or reduce such increases are: Included in the Water System Plan is a comprehensive water conservation program to encourage per capita reduction in water use. 2. How would the proposal be likely to affect plants, animals, fish, or marine life? There should be no impact from projects proposed in the Water System Plan. Measures for protection or conservation will be considered during design and specific impacts will be evaluated at the project level. Proposed measures to protect or conserve plants, animals, fish, or marine life are: This plan is compatible with existing and proposed shoreline use plans. 3. How would the proposal be likely to deplete energy or natural resources? As water demands increase, more energy will be needed to pump water from wells and to higher pressure zones. Proposed measures to protect or conserve energy and natural resources are: Included in the Water System Plan is a comprehensive water conservation program to encourage per capita reductioninWater use. Page 14 of 15 SEPA Checklist 2005 Bremerton Water System Plan 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? Impacts to sensitive areas or other designated critical areas will be evaluated during the design and environmental review of specific projects in this plan. Proposed measures to protect such resources or to avoid or reduce impacts are: None needed at this time. 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? This plan is compatible with existing and proposed shoreline use plans. Proposed measures to avoid or reduce shoreline and land use impacts are: 6. How would the proposal be likely to increase demands on transportation or public services and utilities? Plan propos'es to respond to projected increase in needs for water service resulting from projected population growth in the service area. Increase in demands on public services and utilities resulting from growth will be determined by zoning, land use, and the demand for public services. Proposed measures to reduce or respond to such demand(s) are: None needed. 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. Plan is consistent with good management practices for water resources and does not conflict wit current laws and regulations. Plan conforms to all laws and requirements for the protection of the environment. [Statutory Authority: RCW 43.21C.110. 84-05-020 (Order DE 83-39), ~ 197-11-960, filed 2/1 0/84, effective 4/4/84.] Page 15 of 15 SEPA Checklist 2005 Bremerton Water System Plan Bremerton Plans for Water Supply uf the Future City water customers should have sufficient supplies for the next 20 years, officials say: BY CHRISTOPHER DUNAGAN CDUJlfAGAN@KITSAPSUN.COM BREMERTON Bremerton water officials are thinking ahead to make sure the city can supply wa- ter for a growing population and new businesses expected to arrive in the next 20 years and beyond. New water supplies, con- servation efforts and possibly reuse of sewage effluent are part of a plan to stretch water resources, said Kathleen Ca- hall, water resources manag- er for the city. The population served by Bremerton water - from Gm'st nearly to Silverdale - { Jected to grow by a third ~ __~lln 20 years, creating a demand for 11.3 million gal- lons of water per day, com- pared to 7.7 million last year, according to estimates. "Water in general is some- thing that most people don't think about untH it is not there," said Cahall. State Jaw requires water systems to update their pians regularly, and a new law calls for a separate plan dealing with conservation - techni- cally known as "efficiency." Cahall will discuss Bremer- ton's Water System Plan and a new Water Use Efficien- cy Plan at a Thursday open house from 6 p.m. to 7:30 p.m. Bremerton supplies more thana third oUhe drinking water consumed in Kitsap County. About half is used within the city limits, a. third. saes to puget Sound Naval Shipyard and the rest sup- :llies unincorporated areas. " Cahall said Bremerton res- idents are fortunate to have a sufficient supply of clean wa- tr '.nd with care it will last tears. The city already meets a 2003 state Jaw that says no more than 10 percent of the water may leak ouf of pipes or be otherwise wast- ed. New rules due out next month are expected to re- quire all water systems to in- stall water meters for their customers within 10 years. That's the best way to ensure that the water is going where it is supposed to go and re- duce waste, said Leslie Gates of the state's Office of Drink- ing Water. Bremerton customers use an average of 186 gallons of . water per day. compared to a Western Washingtonaver-" age of 220. Bremerton's av- erage water use has been dropping steadily since 1999, when it was at 190 gpd. Rea- sons for the lower usage in- clude a large number of res- idents classified as low-in- come, higher-than-average sewer rates and an active wa- ter-conservation program, according to the city's plan. Cahall said she hopes that the average consumption will continue to decline as resi- . dents living in older homes replace their toilets and fix- tures with low-flow models and property owners switch to low-water landscaping. Meanwhile, the city Is ask- ing the state for permission to use existing wells needed for future growth. The idea of using Bremer- ton's sewage effluent to water Gold Mountain Golf Course has been put on the back burner, Cahall said. The cost of pumping the water is a ma- jor factor. Also, it turns out that the effluent contains a high con- . centration of seawater, which is not suitable for watering grass. The seawater comes into the system from ship- yard operations and from in- filtration into pipes along the shoreline. Bremerton plans to spend $48 million over the next 20 years to improve piping and storage, install an ultravio- let treatment facility and deal" with earthquake and security Issues. For information or to talte a survey about water use, vis- it wWw.ci.bremerton.wa.us (click on "Departments," "Public Works" and "DrinJc- ing Water") or call (360) 473- 5920. ... M.E"E"I~"~"SET What: Operi~hC:lljSe "for Bremer: tor) water::p!~b~:"~. .. . When: Th~rsi:Jay; 6 to 7:30 p.m. Where: Bremerton Public Works and Utfllties. 100 Oyster Bay Rd. ~~ I< \ TSAf SUN - 11/'if IOf DATE SUBMITTED: i c2 - c::U - 0 (p AGENDA BILL CITY OF BREMERTON Jf () 6 - ;;2 e 3 CITY COUNCIL '8 ............iV~:.4.qq.~................................................................ SUBJECT: Ordinance to Adopt the City of Committee Meeting Date: December 13, 2006 Bremerton Water System Plan Update COUNCIL MEETING Date: December 20, 2006 Department: Public Works and Utilties Presenter: Kathleen Cahall, ~)jlJtt . Wat~r Resources Mgr (J~ Phone: 473-2315 SUMMARY: Water system planning is essential for the Bremerton Water Utility to meet forecasted increases in water demands. The Water System Plan identifies present and future drinking water needs and describes a means to meet those needs in a manner consistent with federal, state, and local laws. State regulation (Washington Administrative Code 246-290) requires public water systems to prepare a Water System Plan every six years. The2005 City ofBremerton Water System Plan Update meets these requirements. A IT ACBMENJ'S: 2005 Bremerton Water System Plan Update - A Va.l \ ~\:,{-e. ov\ e. i fy VJe.I.t><;: I'+~ r. \ a. ~d. ,^o.:Jdea (Jy 11\. thV\AC- (r 0 -\'""t"l t -( FISCAL IMPACTS (Include Budgeted Amount): The Water System Plan includes a 20-year Capital Improvement Plan for the Water Utility estimated to cost $48 million. Improvements needed to comply,with federal Safe'DriIikin ater Act requi[ements are described in the plan. ~., u.~~\-\ '\~-: ClW"e,. ''''c.~ \_ ~ n 'o~e..It. APPROVALS: DEPARTMENT DIRECTO CITY ATTORNEY: FINANCE DIRECTOR: MAYOR: FISCALlBUDGET: OPERATIONS: COUNCIL PRESIDENT: :e- RECOMMENDED MOTION: It is recommended to move to approve Ordinace # 4'l'lfo adopt the 2005 Bremerton Water System Plan. u;, I CONSENT AGENDA. IG;!5, COUNCIL ACTION: 0 ApproveD Deny 0 Table D Continue 0 No ACtion ORDINANCE NO. 41 q ;)- AN ORDINANCE of the City Council of the City of Bremerton, Washington repealing Ordinance No. 4755 and adopting the City ofBremerton 2005 Water System Plan update. WHEREAS, the City of Bremerton last updated its water system plan in 1999 by adoption of Ordinance No. 4755; and WHEREAS, the City desires to plan for the future and growth in its water system service area; and WHEREAS, a water system plan provides a means to meet future water system needs; and WHEREAS, the City is required to formally adopt a Water System Plan under Washington State Department of Health regulations promulgated under Washington Administrative Code 246-290-100 and Bremerton Municipal Code 15.02.020; NOW lHEREFORE, mE CITY COUNCIL OF THE CITY OF BREMERTON DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. Ordinance No. 4755 is hereby repealed in its entirety. SECTION Z. Adoption. That the attached City of Bremerton Water System Plan be adopted. SECTION 3. Severability. If anyone or more sections, subsections, or sentences of this ordinance are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this ordinance and the same shall remain in full force and effect. SECTION 4. Effective Date. This ordinance shall take effect and be in force ten (10) days from and after its passage, approval and publication as provided by law. PASSED by the City Councilthe day of ,2006 CECIL McCONNELL, Council President 1 Wafpr ,f;vf.:fpm Plan Approved this day of , 2006 CARY BOZEMAN, Mayor ATTEST: APPROVED AS TO FORM: PAULA JOHNSTON, City Clerk ROGER A. LUBOVICH, City Attorney PUBLISHED the EFFECTIVE the ORDINANCE NO. day of day of , 2006 , 2006 R:\Legal\Lega1\Ordinances\Public Works & Utilities\Water System Plan.doc 2 ..T_~ __ C'f.._.... ____ n. DATE SUBMITTED: 12-6-06 AGENDA BILL CITY OF BREMERTON CITY COUNCIL fF00 -2 B4 ~ l. .............................................................................~....... SUBJECT: Resolution No. 30 I 'L establishing Water Efficiency Goals for the City of Bremerton Water Utility Presenter: December 13,2006 December 20,2006 Public Works and Utilties Kathleen Cahall, WatGr Resources Mgr t!iI<!- 473-2315 Committee Meeting Date: COUNCIL MEETING Date: Department: Phone: SUMMARY: Passage of the Municipal Water Law in 2003 provided water utilities with more flexibility in the exercise of water rights while also establishing water use efficiency requirements. In response, the Washington State Department of Health is developing regulations requiring the governing body of water systems to establish water efficency goals by July 1,2007. These goals are to be established through a public process in conjunction with the water system's Water System Plan. Bremerton is developing its goals at this time to coordinate with the current Water System Plan Update adoption. ATTACHMENTS: Proposed Resolution; Bremerton Water Utility Water Efficiency Plan and Efficiency Goals; Comments Received During the Public Comment Process FISCAL IMPACTS (Include Budgeted Amount): The Bremerton Water Utility plans to increase annual expenditures for water efficiency outreach by approximately 0.25 F~ and $2,00Q for a total W of approximately $17,000 per year. ~~ oA.A~\.,o_\ ..~~Qw:s4t "'-6c..$ ,~\~ \_~'-- ~'( "toO' ~~~. APPROVALS: ~ DEPARTMffiNTDIRECTOR:~ CITY ATTORNEY: FINANCE DIRECTOR: MAYOR: FISCAL/BUDGET: OPERATIONS: COUNCIL PRESIDENT: RECOMMENDED MOTION: Move to pass Resolution No.3ol9. to establish water efficiency goals. I CONSENT AGENDA I~. B. COUNCIL ACTiON: 0 Approve 0 Deny 0 Table o Continue 0 No Action RESOLUTION NO. 30 t cr A RESOLUTION of the City Council of the City of Bremerton, Washington to establish Water Efficiency Goals for the City ofBremerton Water Utility. WHEREAS, the City of Bremerton has made a commitment to water efficiency since the early 1990' s; and WHEREAS, the Bremerton Water Utility and its customers hav.e improved their efficient use of water since that time; and WHEREAS, the City desires to comply with proposed changes to the Washington Administrative Code 246-290 requiring Bremerton to establish water efficiency goals every six years as part of its Water System Plan approval; and WHEREAS, water efficiency goals must describe measurable outcomes in terms of reduced or maintained water production or. usage; and WHEREAS, the City provided a public forum for water customers and the public to participate and comment on the water efficiency goals; and WHEREAS, the City Council has reviewed and considered all comments received; NOW 11IEREFORE, TIIE CITY COUNCIL OF mE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. The following are the water efficiency goals for the City of Bremerton Water Utility: 1. Maintain water use per single family household to below 195 gallons per day on a three year average. 2. Keep maximum day demand less than twice the average day demand on a three year average. 3. Maintainnon-revenue water below 8% on a three year average, SECTION 2. Water Efficiency Goals may be changed in accordance with Washington Administrative Code 246-290. SECTION 3. Severabilitv. . If anyone or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not Water Efficiencv Goals affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. SECTION 4. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. day of PASSED by the City Council of the City of Bremerton, Washington this , 2006. CECIL McCONNELL, Council President APPROVED AS TO FORM: ATTEST: PAULA JOHNSTON, City Clerk ROGER A. LUBOVICH, City Attorney R:\Legal\Legal\Resolutions\PUblic Works\ Water Effenciency Goals.doc 2 1"'~":"I;i~ l; ,"-; - "". ~ , _<"/e-- l-l\Y'," 0 F B.Re'E~lON City of Bremerton Public Works and Utilities Water Use Efficiency Plan Applies to: Bremerton Main System #08200R Bremerton West 517 Pressure Zone System #082734 Rocky Point Water District #02052E Latest revision: December 2006 Table of Contents I ntrod uction .".................................................................:.................................................................... ......... 1 Current Water Use Efficiency Program ............................... ................................................................... 2 Estimated Water Saved by Bremerton's WUEPciver the Last Six years......................................... 5 Water Use Efficiency Goal-setting ................................... .... .......... ....................... ..... ............. .......... ...... 7 Rationale for Goal Setting................................................................................................................ 7 Water Use Efficiency Measures Implementation and Evaluation .................................................. 9 Public Education..............;..........;...............;.................................................................................. .. 11 I ndoor Residential........................................................................ .................................................... 12 Outdoor Residential and Commercial................... ........... ............... ................................. ............. 12 Indoor I ndustrial, Commercial, Institutional...................... ...................... ........ .......................... .... 13 Reg ulatory ......................................................................................................................................... 13 Other Measures............................................................................................................................... 13 Expenditures for Water Use Efficiency Measures ..... ................. ......................... ................................ 15 Water Distribution System Leakage Evaluation ....................... .............................................. ............. 15 Future Reductions as a Result of Water Use Efficiency.................................................................... 16 References.......................................................................................................................... ...................... 21 City of Bremerton Interim Water Use Efficiency Plan Introduction The City of Bremerton owns and operates a Class A municipal water system serving approximately 52,000 people. Bremerton also owns and operates a non-transient-non- community water system with a non-resident population of about 400 people. Additionally, Bremerton sells water to the Puget Sound Naval Shipyard, the Rocky Point Water District, and the City of Port Orchard. Details of water system management are described in the City of Bremerton Water System Plan (WSP). In 2003, the Washington State Legislature passed the Municipal Water Supply - Water Use Efficiency Requirements Act. The Department of Health is expected to adopt water use efficiency regulations in late 2006. These regulations will require water systems to prepare Water Use EfficiencyPlans (WUEP). This WUEP for the City of Bremerton is "interim" to meet the requirements of the 2005 Water System Plan schedule but is being completed before the final requirements of the regulations in WAC 246-290-800 through 850 take effect. The new regulations will apply to WSPs submitted for approval after July 2007. Water use efficiency is defined by the draft rule as "increasing water supply efficiency and water demand efficiency to minimize water withdrawals and water use". A WUEP documents the policies and activitie~ implemented to minimize supply and demand inefficiencies and to reduce water withdrawals and water use. The City of Bremerton has placed an increasing emphasis on water use efficiency efforts since the early 1990's. The City has expanded its customer program and is active in regional water use efficiency programs such as the Water Purveyors Association of Kitsap County (WaterPAK) Water Conservation Task Force and the Partnership for Water Conservation Puget Sound. Efficient water use benefits the environment, public health, and economy by helping to improve water quality, maintain aquatic ecosystems, and protecting water resources. The draft WUEP requirements for systems serving more than 10,000 connections are: . Describe the current WUEP . Estimate the water saved the past six years . Describe water use efficiency goals and document how they were set . Describe all water use efficiency measures to be implemented in the next six years, including schedule and budget . Estimate projected water savings . Describe how the water use efficiency program will be evaluated . Evaluate water distribution system leakage . Provide an assessment of the water that could be saved through implementation of water use efficiency measures City of Bremerton Interim Water Use Efficiency Plan Page I How Bremerton is meeting current water efficiency requirements and how new requirements are planned to be addressed are described in this WUEP. Current Water Use Efficiency Program The City of Bremerton values the continued high quality and adequate supply of its water resources. The City believes that customer education about water quantity and quality creates awareness which results in improved water use habits. Water use efficiency can be viewed as a resource, an alternative to developing new water supplies to meet new water demands. The current objectives of the City of Bremerton Water Use Efficiency Program are as follows: . Maintain use per ERU below 195 gallons per day per single family residence (an estimate of the average use per ERU in Western Washington in 220 gal/day. . Keep Maximum Day Demand less than twice the Annual Average Day Demand . Meter every source . Meter all demands as practicable and provide an estimate for demands that cannot be metered (such as for flushing and firefighting) . Maintain the water system to prevent leaks and promptly repair all leaks that occur and maintain the difference between volume of water produced and metered water used below 8% on a 3-year average. . Educate customers about their water sources and basic water supply principals . Encourage a conservation ethic . Provide tools for customers to reduce water use . Increase customer awareness of water-use habits and the value of water . Reduce system wide per-capita water consumption e Improve system reliability . Protect environmental resources . Ensure water use efficiency prior to developing new sources of supply Under the new requirements, prior to July 1, 2007, Bremerton will have to implement a public process to have City Council set water efficiency goals considering: . Historic water use efficiency performance . Historic Water use efficiency investment . Customer base demographics . Regional climate variations . Forecasted demand characteristics . Water supply characteristics. . System financial viability . System reliability . Affordability of water rates Implementation of the objectives has the potential for water savings on both daily and peak demand basis, thereby delaying the need to develop costly new resources and City of Bremerton Interim Water Use Efficiency Plan Page 2 avoid capital costs. Water use efficiency programs will also be required if a system will be requesting additional water rights or will be applying for State Revolving Fund loans. Under the new regulations, the City of Bremerton is required to implement the measures for a large system (over 10,000 connections). The table below identifies the measures required for both medium and large public water systems under the previous recommendations. In addition to these measures; demand has also been reduced by the 1992 Energy Policy Act which requires efficient plumbing features in new construction. Table 1 shows how Bremerton exceeds the recommended water use efficiency program for public water systems (from "Conservation Planning Requirements" Washington State Department of Health, March 1994). City of Bremerton Interim Water Use Efficiency Plan Page 3 Table 1 Recommended DOH Water Conservation Program (current requirements effective 1994) Recommended Implemented by for Medium Bremerton A. Public Education Systems 1. School Outreach ./ 2. Speakers Bureau ./ 3. Program Promotion ./ ./ 4. Theme Shows and Fairs ./ B. Technical Assistance 1. Purveyor Assistance ./ ./ 2. Customer Assistance ./ ./ . 3. Technical Studies ./ 4. Bill Showing ./ ./ Consumption History C. System Measures 1. Source Meters ./ ./ 2. Service Meters ./ ./ 3. Unaccounted Water/Leak ./ ./ Detection D. Incentives/Other Measures 1. S ingle-family/Multi-family Kits ./ ./ 2. Nurseries/Agriculture 3. Landscape Management! ./ Playfields/ Xeriscaping ./ ./ 4. Conservation Pricing 5. Utility Financed Retrofit ./ ./ 6. Seasonal Demand Management ./ 7. Recycling/Reuse ./ Under the new regulations, Bremerton will have to implement or evaluate at least nine water use efficiency measures. Bremerton's current program exceeds this requirement as described in Table 3. City of Bremerton Interim Water Use Efficiency Plan Page 4 Estimated Water Saved by Bremerton's WUEP over the Last Six Years A good measure of water savings is to look at use per single family unit (also known as an equivalent residential unit (ERU)). Bremerton's water use per ERU has been dropping steadily as indicated in Figure 1. From 1999 - 2004 the use per ERU dropped from 190 to 184 gallons per day, a 3.2 % decrease. Use per ERU dropped even more in 2005 due to media attention to the drought. 240 City of Bremerton Public Works and Utilities Equivalent Residential Units 140 120 220 _ 200 ~ 0:: w 180 >. co :e 160 c; C> 100 \'. 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 --- Gal/dayJERU ----.- Running Average -+- Average Western WA Use Figure 1 Bremerton's average water use per ERU from 1999 - 2004 is only 183 gallons per day. This figure is low compared to the estimated Western Washington average use per ERU of 220 gallons per day and reflects several characteristics of Bremerton's system including: . Small lot size within the City limits . A much higher percentage of rentals (60%) than the national average (40%) . 49% of Bremerton's residents are classified as low income . Much higher sewer rates than the state average .An active water conservation program. Table 2 presents the results of Bremerton's water conservation program from 1999 through 2004. City of Bremerton Interim Water Use Efficiency Plan Page 5 Table 2 Water Conservation Goals and Achievements 1999 - 2004 Customer Conservation Projected Actual Class Goal Indoor Outdoor Demand Demand Explanation Reduction Reduction Bremerton's conservation Influence 5% of Use program focus is accounts Savings of reduced by primarily on this Single- ( approximately 80,000 gpd customer class family 700 units) each ./ ./ for an ADD 90,000 gpd resulting in an for an ADD homes year to reduce of 2.64 of 2.63 expected response. their water use MGD MGD There was also a 10% 4.2% reduction population during this time. Influence 5% of Use the units Savings of reduced by The 4.2% reduction (approximately 12,000 gpd in population would Multi-family 300 units) each ./ for an ADD 110,000 gpd have affected this year to reduce of 0.79 for an ADD customer class the of 0.69 their water use MGD MGD most. bv5% Influence 5% of Use There has been an accounts Savings of increased increase in number ( approximately 12,000 gpd by 290,000 of commercial Commercial 130 units) each ./ for an ADD accounts and the year to reduce of 0.76 gpd for an WWTP has used ADD of 1.06 their water use MGD MGD more water for their bv5% odor control system. Influence 5% of During the 2001 the irrigation Use drought, a major Savings of focus was on accounts 6,500 gpd reduced by reducing irrigation Irrigation ( approximately ./ for an ADD 140,000 gpd resulting in 10 accounts) of 0.43 for an ADD operational each year to MGD of 0.30 changes, especially reduce their use MGD by 5%. with the City Golf Course and Parks. Savings of Use Reduce total reduced by Although asked, the water use by './ . 100,000 gpd 1,070;000 Navy does not. have Navy ./ for an ADD 10% from 1999 of 3.24 gpd for an an explanation for - 2019 MGD ADD of 2.27 the decreased use. MGD City of Bremerton Interim Water Use Efficiency Plan Page 6 Water Use Efficiency Goal-setting Water efficiency goals must: . Describe measurable outcomes in terms of reduced or maintained water production or usage. . Be set in a public forum that provides opportunity for consumers to participate and comment. . Be reviewed by the City Council who will consider all comments received. . Be updated every 6 years as part of the Water System Plan approval process. Bremerton is already doing an excellent job with water efficiency but still has some room to improve. Proposed goals were selected to maintain our conservation achievements, be reasonable to attain, and be easily communicated to our customers. The following water efficiency goals were proposed for Bremerton: 1. Maintain water use per single family household to below 195 gallons per day on a three year average. 2. Keep maximum day demand less than twice the average day demand on a three year average. 3. Maintain non-revenue water below 8% on a three year average. Rationale for Goal Setting A large portion of Bremerton's water conservation outreach is to residents and homeowners. The amount of water used by single family households is calculated annually and is shown in the chart below: City of Bremerton Public Works and Utilities Equivalent Residential Units 230 ..... 220 210 ' ~ 200 ~ 190 '" ;g 180. ~ 170 160 150 140 ' 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 - Gal/day/ERU - Proposed Goal -- Average W. WAUse - Linear (No Drought Data) The average use per single family household in Western Washington is 220 gallons per day. Bremerton has seen a steady decline in use per household since 1994. The proposed water efficiency goal of keeping single family household use below 195 gallons per day is 11 % less than the state average and indicates the City's dedication to maintaining the conservation advances already made. City of Bremerton Interim Water Use Efficiency Plan Page 7 Another emphasis of Bremerton's conservation program is to reduce high demands in the summer by encouraging residents and businesses to use water wisely outside such as by using recycling car washes and landscaping with plants with lower water needs. One way to measure increased water use in the summer is to compare the water used on the peak day with the average amount of water used throughout the year as shown in the graph below. Ratio Maximum Day Demand to Average Day Demand 2.2 1.8 2.0 o ~ 1.6 0:: 1.4 1.2 1.0 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 -- Ratio MDD to ADD -- Proposed Goal - Linear (No Drought Data) Bremerton thinks that keeping this ratio below two is a reasonable way to evaluate our outdoor conservation program. Future conservation outreach will continue to emphasize prudent outdoor water habits. In addition to our water customers being efficient with their water, the water system itself has to be efficient. Bremerton carefully manages its water resources by tracking all the water it uses through source meters, tracking customer use through individual meters, ensuring main breaks are promptly detected and fixed, and being alert to other water losses. Each year we compare the amount of water produced to the amount of water sold to customers as shown in the chart below. City of Bremerton Public Works and Utilities Non-revenue Water (Water Production vs. Consumption) 10"10 . 9% 8"10 7"10 6% % 5% 4"10 3"10 . 2"10 1"10 0"10 Re ulatory Llmt Proposed Goal 1999 2000 2001 .2002 2003 2004 2005 = "10 DIFFERENCE - Linear ("10 DIFFERENCE) City of Bremerton Interim Water Use Efficiency Plan Page 8 The new water efficiency regulations require that the amount of water lost through system leaks be less than 10%. Bremerton proposes that the amount of water not measured by customer meters ("non-revenue" water), which includes leaks, plus water used for flushing, firefighting, and other non-metered uses be less than 8% each year. This is more than 20% below the state standard which only addresses leaks. Since Bremertoil is already doing very well in the area of efficient \'vater use, these goals aim to maintain current water-wise actions by customers and the water system. Bremerton also proposes that these goals be averaged over a 3-year period so that an unusual circumstance in anyone year does not cause a goal to be unachieved. Bremerton'sforum for public input to these conservation goals was multi-faceted. In addition to the public process during City Council approval of the water system plan, a survey and information was available at: . the Water Utility billing counter at 3027 Olympus Drive, . on the City's web page at www.ci.bremerton.wa.us , and . a public meeting held for November 16,2006 at 100 Oyster Bay Drive from 6 to 7:30 pm. City council reviewed the comments received and since no comments recommended a change to the. proposed goals, the City of Bremerton City Council established these goals by resolution on December 20, 2006. Water Use Efficiency Measures Implementation and Evaluation Table 3 provides the descriptions of components for the proposed water use efficiency program necessary to meet the new regulations: · Describe the water use efficiency measures being implemented · Schedule when water use efficiency measures will be implemented · Budget for the measures · Estimate water savings projections by identifying a percentage saving goal · Evaluation to measure the success of programs This program will apply to the two water systems owned and managed by Bremerton - the Main System (#08200R) and the West 517 Zone System (#082734), and to the system Bremerton contract operates - the Rocky Point Water System (#02052E). Bremerton's wholesale customers are responsible for developing and implementing their own WUEPs. City of Bremerton Interim Water Use Efficiency Plan Page 9 Table 3 City of Bremerton Water Efficiency Measures Efficiency Measure Schedule Annual Estimated Annual Evaluation Budget Water Savings Education City's Website Continuous $ 500 Count visits Annual report Annually in the $3,000 Count CCRs sent Sorina Track calls received Customer bills showing history Continuous N/A Track number of bills each cycle Brochures Continuous $1,000 Count distribution Information booth at events, inc!. As appropriate $2,000 Track number of visitors Water Festival Speakers As requested $ 500 Track attendees Celebrate Drinkinq Water Week First week in Mav $1,500 All the education components Track Dress and events Provide give-aways (pens, provide outreach and support the pencils, pads, magnets, water Continuous $2,500 other efficiency measures. Track give-aways bottles) Work with WaterPAK on booths When events at the Home Show, Kid's Day, $1,500 Track attendees and the Fair occur Participate in Partnership for water Conservation activities Continuous $1,500 Track activities and promotions PSE Powerful Choices program 1/yr usually in $2,500 Track students reached. in the schools May teacher evaluation Indoor Residential . Each fixed leaky toilet saves 1 0 Track testers given away, Toilet testers Special promotion $ 500 gallons per day or 3,650 gallons per year oer toilet. survey about use Special promotion Each toilet replaced will save Survey about toilet Toilet replacement promotion to begin in 2008 $ 500 approximately 20 gallons per day replacement or 7,300 aal/vr oer toilet. Each properly-installed kit is Track give-aways, track Indoor kit give-away Special promotion $1,500 estimated to save 10% of indoor water use or 6,500 oal/vr. water use, survey Continuous, plus Supports other residential "Be a leak seeker" campaign promotion at the $1,000 efficiency measures. Track materials distributed fair Leak notification letter As needed $ 500 N/A Track number of (aoorox. 350/yr) notifications Outdoor Residential and Commercial Spring and $2,000 Difficult to measure as it is Irrigation Outreach using ET Summer starting (future) a component of the use in 2007 All measures combined are oer ERU Irriaation brochure Sent in Mav $ 300 estimated to reduce irrigation use Track number sent Rain gage give-away Special promotion $1,000 by 5 - 20 %. Track give-aways, survey use Demonstration aarden Continuous $ 500 Rain barrel promotion Continuous $ 500 Each rain barrel installed saves Survey about rain barrel about 600 aallons/vr use Industrial, Commercial, Institutional Coordinate proqram with PSNS Continuous $500 An estimated 10% throuah 2019 Track PSNS water use Commercial Irrigation Outreach . Spring and 5.-.20% of commercial irrigation Trackwater through Surrimer starting $2,000 using ET in 2007 use irrigation meters Regulatory Two tier Water Rate Began in $0 Too early to evaluate Track customer bills November 2004 affected bv the second tier No water waste in ordinance Continuous $0 N/A Track incidences of waste Saved 18% of summer use and Track reductions in water Water Shortage Plan When initiated $0 reduced MDD by 3 MGD in use by customer class drouqht vear 2001 City of Bremerton Interim Water Use Efficiency Plan Page ] 0 Public Education The following activities are the components of Bremerton's public education activities for water efficiency: City Website: The home page of the City's website has a special icon for a quick link into the water resources section. Bill Showinq Consumption Historv: Bremerton's water bills show the past years' water consumption history in a table as cubic feet. The usage during the same period the previous year is called out separately for easy comparison. Annual Report: Each year Bremerton sends out an annual report as required by regulations requiring a "consumer confidence report" be delivered to each customer before July 151 each year. Bremerton includes conservation information in its annual report. Brochures: Bremerton has a wide variety of brochures and fact-sheets on many water conservation topics including leak detection, water wise gardening, rain barrels, etc. located in public places throughout the service area. Give-awavs: A variety of give-aways remind customers about the importance of water conservation such as: pens, pencils, magnets, and notepads with a conservation message and phone numbers/web sites. Some give-aways actually help them conserve such as rain gages, low flow shower heads, toilet testers, and toilet saver bags. Celebrate National Drinkinq Water Week: Activities include a proclamation by the Mayor, displays at area libraries, conservation bucket give-away, and Bremerton Kitsap Access Television water film fest. Speakers Bureau: The City targets teachers, students and youth groups in various programs. Bremerton provides classroom visits, video library and brochures about water resources and conservation to schools in its service area. These educational opportunities are advertised in the "Enviroguide: Environmental Education Resources in Kitsap County", which has been provided to elementary, secondary, high school and home-school educators throughout the county annually since 1998. Theme Shows and Fairs:" The City has portable displays which are used at local theme shows and fairs promoting the use of water efficient practices and devices, describing the sources of drinking water and promoting efficient use of our remarkable water resources. At some events, the display is accompanied by a staff member dressed in a costume of Splash!, our waterdrop mascot. Additionally, the City assists with the annual Kitsap Water Festival, which provides a day of water learning and fun to 1,000 41h grade City of Bremerton Interim Water Use Efficiency Plan Page II students. At the event, the City provides displays and classroom sessions about water resources and water conservation. Water Purveyors Association of Kitsap (WaterPAK): Participate in WaterPAK conservation task force and Water Conservation Coalition of Puget Sound (WCCPS): These groups provide a presence at community events, PSAs in newspaper, radio, and TV, and WCCPS has a website. Puqet Sound Enerqy's (PSE) Powerful Choices Proqram: This yth grade classroom program consists of 4 days with a focus on water, air, land, and energy. Bremerton pays a portion of the costs of the program. Indoor Residential "Be a Leak seeker!" Campaiqn: Customers are encouraged to check for and fix leaks in their home. Campaign is promoted through brochures, displays, and the WaterPAK Kitsap County Fair booth. Toilet Testers: Bremerton supplies toilet h3ak detectors at the front counter and at special events. Toilet Replacement Promotion: Customers with older toilets are encouraged to replace them. Indoor Kit Give-away: Indoor kits are handed out after having the customer sign a pledge and allowing us to access their water use records. Leak Notification: Should a customer's bill have unusual consumption, a letter and leak brochure are sent. Outdoor Residential and Commercial Landscape Manaqement: The City sends a brochure annually in the spring to irrigation customers to promote maintenance of irrigation systems and efficient watering practices. In 1996 the City installed and has maintained a water conservation demonstration garden at the public works and utilities facility. A brochure describing waterwise gardening practices and a list of the plants is available at the billing office at the facility. Bremerton has plans to provide area-specific ET information on the internet. Rain Gaqe Give-away: Rain gages are distributed with information to encourage waterwise gardening. Demonstration Gardens: Demonstration gardens are located at the Utility's office at Olympus Drive and at the Givens Center in Port Orchard. Other smaller "pocket" gardens are being planned. City of Bremerton Interim Water Use Efficiency Plan Page 12 Rain Barrel Promotion: In 2001, Bremerton led a county-wide promotion on rain barrels with 1,000 sold. Now the focus is to encourage customers to build or purchase their own. The local Kitsap Lumber provides the kits at a reasonable cost. Indoor Industrial, Commercial, Institutional Coordinate with PSNS: PSNS is Bremerton's largest water consumer and uses about a third of the water produced. They are currently proceeding with an in-depth water conservation audit. Regulatory No Water Wastinq Ordinance: Bremerton Municipal Code 15.02.200 states, "Any person or owner receiving water service shall not waste water, or allow it to be wasted, by imperfect or leaking stops, valves, -pipes, closets, faucets, or other fixtures, or to use the water for purposes other than those named in the application. Violation shall constitute grounds for the discontinuation of water service. (Ord. 4309 92 (in part), 1991 ) Water Shortaqe Continqencv Plan: Last was implemented in 2001. Customers responded appropriately and saved 18% of their previous summer's demands. Conservation pricinq: Bremerton has a two-tiered water pricing structure to encourage conservation. Other Measures Recvclinq/Reuse: Water reuse is the beneficial use of reclaimed wastewater treatment plant effluent in compliance with Washington Departments of Ecology and Health regulations. Bremerton currently uses reclaimed secondary wastewater effluent to irrigate inside the wastewater treatment plant grounds and at a neighboring business. Approximately 130 gpm is used for in-plant uses and an additional 120 gpm are used for irrigation in the summer months for an annual total of 88 MG/year. A "Water Reuse Feasibility Study" completed in 1998 identified the potential demands for and costs to provide additional reclaimed water to potential users in the Bremerton area. Bremerton's wastewater has higher than average saltwater from collection system infiltration and Puget Sound Naval Shipyard inflow making reuse possibilities challenging. A 2005 County-wide reuse study indicated that Bremerton had the least potential for large:"scale reuse and recommendedgrantfunding be focused at other locations with more feasible reuse opportunities. The City is currently evaluating the next step to take in reuse. City of Bremerton Interim Water Use Efficiency Plan Page 1 3 Evaluation of Conservation Programs Every communication effort can benefit from being evaluated. Evaluation can help a current communication effort achieve its objective and make future efforts more successful. Each strategy for Utility communications presented in Table 2 has suggested methods for evaluation. Evaluation methods Bremertpn currently employs include: . Counting the number of brochures distributed. Are some brochures or topics more popular than others? Are some distribution methods or locations more popular than others? . Track the number and kinds of customer phone calls received. What issues are important to those who take the time to call? . Track the number of visitors to a booth or at an event. Are some events more popular than others? . Review news reports in response to a news release or interview. Did press releases generate the desired coverage? Was the information published what was intended? Where in the paperwasthe article? . Track City web site visits. Which pages are more popular? . Track water use. Are customers responding to conservation methods? In the summer of 2001 all customer classes (with the exception of PSNS) reduced water use an average of 18% in response to extensive increase of customer outreach requesting a voluntary 10% water reduction. More involved evaluations can take the form of surveys. For a survey to be truly meaningful, it needs to be performed on a random sample, with an adequate number of respondents, containing appropriately-worded questions. Simple questionnaires can be used to get general information as long as the results are used carefully. The City has performed surveys as an integral part of some projects. In 1993 when the City was required to perform customer tap sampling for compliance with the Federal Lead and Copper Rule, a written survey was performed. Additionally, when customers received indoor conservation kits for the technical study, a survey was performed. The surveys have assisted the City with determining attitudes towards water use efficiency, service, cost and the optimum methods to use to communicate with customers. The City will continue to perform surveys of customers. The City was the coordinator of a county-wide study to determine the effectiveness of single- family indoor conservation kits. Over 2,000 kits were distributed countywide, with the City distributing 650 kits. Water usage data of 140 customers before and after kit installation was collected from seven participating water purveyors, including Bremerton. The study determined that, on average, a 10% water savings was experienced by the study group during the winter months. This study provided local. data to be used when promoting kits. City of Bremerton Interim Water Use Efficiency Plan Page 14 Expenditures for Water Use Efficiency Measures Bremerton budgets funds to be used for water conservation and other water public outreach. The amounts spent in past years and the proposed amount to be budgeted in the future are in Table 4. Table 4 Bremerton Expenditures on Customer Water Use Efficiency Activities Year Full-time Equivalent Supplies and Services Employees 1995 0.28 $5,000 1996 0.23 $5,293 1997 0.35 $5,369 1998 0.28 $3,936 1999 0.26 $5,978 2000 N/A N/A 2001 (drought) 0.28 $14,241 2002 0.11 $8,391 . 2003 0.15 . $8,151 2004 0.07 $8,369 2005 0.12 $5,000 2006 0.10 $17,600 Water Distribution System Leakage Evaluation The draft new water efficiency regulation requires that water distribution system leakage may not exceed 10% of total water produced and purchased (using a rolling 3-year average). Compliance will begin in 2010 and will be based on data from 2007 - 2009 (details may change when the regulation is finalized). Leakage is defined as water loss from the system that is not metered and not used for authorized purposes such as for flushing and fire-fighting. Bremertonis a fully-metered system. All sources are metered and all pump stations are metered to track flows in the distribution system. All customers are metered. Bremerton also meters the fire training center and construction hydrant meters. There are two locations in the service area to fill tanker trucks at no cost that are metered. Each year Bremerton calculates the difference between gallons of source water produced and metered water to customers. This difference has been called "non- revenue water" and it includes authorized non-metered water such as for flushing and firefighting as well as leaks and unauthorized water use. Non-revenue water for the past 6 years is shown in Figure 2. City of Bremerton Interim Water Use Efficiency Plan Page 15 City of Bremerton Public Works and Utilities Non-revenue Water (Water Production vs. Consumption) 10% 9% 8% 7% 6% % 5% 4% 3% 2% 1% 0% .---- r--- r--... -,--- . - -- - . - - -. .Ir - - - - - - -.. - - - - -.. - -.. - . - - -- - - ~ : : 9.5 9.0 8.5 8.0 7.5 7.0 6.5 6.0 5.5 5.0 M G D 1999 2000 2001 2002 2003 2004 2005 ~ % DIFFERENCE - PRODUCTION (MGD) - · . CONSUMPTION (MGD) Figure 2 The average non-revenue water for Bremerton form 2000 - 2005 is 4.7% or approximately 130 million gallons per year. Because this difference has been consistently well-under the 10% standard for leaks, Bremerton is not required to have a water loss control plan. The annual components of the non-revenue water are estimated to be: Annual system flushing Chlorine/pH analyzer flow to waste (6 locations @ 2 gpm) Firefighting Water theft Meter inaccuracy Leaks in the transmission AND distribution systems Annual Average Total Non-revenue Water 11 MG 6MG 2MG 1 MG 10 MG 130 MG 130 MG Future Reductions as a Result of Water Use Efficiency Water demand is measured through the approximately 16,800 service meters located at each customer's connection to the City:s system. All services are metered. Navy contracted meters are read monthly and Water Utility personnel read the other residential and commercial meters every other month. Average day demand for the five years 1999 through 2004 is 7.7 MGD. Maximum day demand (MOD) is defined as the highest amount of water used ih a single day in the calendar year. This usually occurs in the summer as a result of increased outdoor use. For Bremerton, this data is estimated using source production meters. The ratio of MOD to ADD for the past five years range from 1.76 to 1.94 which City of Bremerton Interim Water Use Efficiency Plan Page 16 is in the expected range for Washington water systems. Forecasted MOD were calculated using a peaking factor of 2.0. City of Bremerton Water Demands 18 16 - DLll.UQbLE'la 7-"G-OO IIl1lI ement ed 14 12 C 10 C> 8 :!E 6 4 - 2 - o , 1999 2000 2001 2002 2003 2004 II ADD liiIMDD Figure 3 City of Bremerton 6-yr Average Water Use by Type of Use ADD = 7.70 MGD Non-re..enue water 6% Single Family Residential 35% Irrigation Commercial/ 5% non~residential 12%. Figure 4 City of Bremerton Interim Water Use Efficiency Plan Page 17 Navy properties include the Puget Sound Naval.Shipyard (PSNS), Jackson Park Housing complex, the Navy Hospital, and several other smaller accounts. The largest demand in the entire system is PSNS which has a water demand of about 2 MGD. Historically, the Navy has had a significant effect on Bremerton's water system. It was due to increases in workload at PSNS and the resulting increase in Bremerton's population that water demands skyrocketed during World War II. Within PSNS the water uses are indListrial/commercial use (64%), shipboard use (18%), steam production (13%), and residential use (5%). There are approximately 1,400 non-residential water accounts in the Bremerton service area consisting of commercial, government, and industrial entities. Other large non- residential water users include the two area hospitals and the City's wastewater treatment plant. The majority of businesses consist of office-based businesses, restaurants, medical facilities, automotive shops, and services (dry cleaners, beauty shops, etc.). As the population grows and commercial/industrial development occurs, demands on the water system will increase accordingly. Water systems are required to prepare two forecasts: one forecast without conservation 'and'one forecast showing the expected reduction from implementation of a water use efficiency program. For the "without conservation" forecast, average day system demands were estimated assuming a continuation of the existing residential per capita demand and using population projections, and water use projections provided by the Navy and for planned commercial/industrial development. Annual average demand projections were based on the following approach: . Residential demands for single family housing were calculated by increasing the 2004 residential demand of 2.63 MGD by the same percentage as the projected population increases. Additional demands were reduced by 5% to account for implementation of mandated reduced flow plumbing fixtures in new construction. . Multi-family units forecasted demands were calculated the same way as single- family units. . The non-residential demands for commercial/industrial development was calculated by increasing current demands by the same rate as population growth and then adding the increased demands of proposed large developments to the existing commercial/industrial demands. . Demands for PSNS were expected to reduce from implementation of their planned conservation program. Jackson Park Housing is built-out Demands for the entire Navy contracted water use were estimated to be 2.34 MGD by 2019. . Irrigation demands for custorners with separate irrigation meters were calculated to increase at the same rate as the growth in commercial/industrial use. A separate average day demand forecast was calculated "with conservation" taking projected water use efficiency reductions into account as follows: City of Bremerton Interim Water Use Efficiency Plan Page 18 · Single family residential- reach 5% of accounts (approximately 700 units) each year for the next 10 years and they reduce water consumption by an additional 10%. This includes reductions in both indoor and outdoor use. Since estimates indicate Bremerton has previously reached 30% of customers, by the end of the next ten years, 80% of single-family customers will have been reached and influenced to conserve 5%. · Multi-family residential- reach 5% of the units (approximately 300 units) each year for the next 10 years and they reduce water use by 5%. Opportunities for water use reduction are more limited with multi-family dwellers. · Commercial - reach 5% of accounts (approximately 130 units) each year and they reduce water use by 5%. This includes only indoor use. · Irrigation - reach 5% of the irrigation accounts (approximately 10 accounts) each year and they reduce use by 5%. In 2010 begin using reclaimed water at Pendergast Park. · Navy properties - reduce total water use by 10% over the 20-year planning period. · After 2010, focus water use efficiency efforts on preserving the water use efficiency behavior of the 80% of the accounts previously reached. This approach assumes that some customers will be resistant to water use efficiency actions. Table 5 and Figure 5 present the current water use forecasts. Table 5 2005 2.n 2.50 0.74 0.74 1.13 1.13 0.32 0.32 2.23 2.28 0.44 0.45 0.13 0.05 7.91 15.62 7.81 15.63 2006 2.85 288 0.76 0.76 1.16 1.17 0.33 0.33 2.19 2.28 0.45 0.46 0.14 0.10 8.12 16.24 7.98 15.95 2007 2.02 2.00 o.n 0.78 1.21 '.22 0.34 0.34 2.14 2.28 0.47 0.46 0.14 0.25 8.47 16.93 8.24 16.48 2008 2.98 3.04 0.79 0.50 1.25 128 0.35 0.35 2.10 2.30 0.47 0.49 0.14 0.25 8.63 17.27 8.34 16.67 2009 3.04 3.12 0.81 0.82 1.28 1.31 0.38 0.38 2.05 2.31 0.46 0.50 0.14 0.25 8.81 17.62 8.42 16.85 2010 3.10 3.20 0.81 0.84 1.33 135 0.38 0.37 200 2.31 048 0.51 0.15 0.25 8.0 17.96 8.54 17.06 2011 3.15 3.27 0.84 0.88 1.37 1.39 0.37 0.38 2.00 2.32 0.49 0.52 0.15 0.25 0' 18.29 8.69 17.37 2012 3.22 3.35 0.88 0.88 1.45 1.46 0.38 0.39 2.07 2.33 0.50 0.53 0.15 0.25 9,37 16.73 8.89 17.n 2013 3.27 3.43 0.88 0.00 '.53 1.57 0.39 040 2.06 2.34 0.51 0.54 0.15 0.25 0.5 19.17 9.07 18.13 2014 3.33 3.51 0.00 0.03 1.61 1.88 040 0.41 2.08 2.34 0.52 0.56 0.16 0.25 9.81 19,62 0.25 18.51 2015 3.40 3.56 0.02 0.05 1.70 1.75 0.41 0.42 2.00 2.35 0.54 0.51 0.16 0.25 10.0 20.06 9.47 18.94 2016 3.46 3.88 0.84 0.97 1.73 1.83 0.42 0.42 2.10 2.38 0.54 0.56 0.16 0.25 10.2 20.47 9.62 19.23 2017 3.55 3.74 0.00 0.09 '.85 1.00 0.43 0.43 2.10 2.37 0.56 0.50 0.16 0.25 10. 20.87 9.87 HI.73 2018 3.62 3.82 0.08 1.01 '.84 1.09 0.43 0.44 2.11 2.37 0.57 0.60 0.17 0.25 10.86 21.31 10.08 20.16 2019 3.70 3.89 1.00 1.03 2.01 2.07 0.44 0.45 2.12 2.38 0.58 0.61 0.17 0.25 10.86 21.73 10.27 20.54 2020 3.n 3.97 1.02 1.05 2.00 215 0.45 0.46 2.12 2.39 0.50 0.63 0.17 0.25 11.07 22.15 10.47 20.05 2021 3.84 4.05 1.04 1.07 2.18 2.24 0.46 0.47 2.13 2.40 0.61 0.84 0.17 0.25 11.2 22.59 10.69 21.38 2022 3.02 4.12 1.00 '.00 225 2.31 0,47 0.46 2.14 2.40 0.62 0.85 0.18 025 11.4 22.98 10.68 21.76 2023 3.09 4.20 1.08 1.11 2.34 2.40 0.48 0.49 2.14 2.41 0.63 0.88 0.18 0.25 11.71 23.42 11.09 22.19 2024 4.00 4.27 1.10 1.13 2.42 2.48 0.40 0.50 2.15 2.42 0.84 0.67 0.18 0.25 11.91 23.83 11.zg 22.56 City of Bremerton Interim Water Use Efficiency Plan Page 19 City of Bremerton Historical Water Use and Demand Forecast 5 25 20 >- co o ; 15 Co III <: .2 n; Cl <: ~ 10 ~ o 1999 2001 2003 2005 2007 2009 2011 2013 2015 2017 2019 2021 2023 -- Average Day Demand Without Conservation __ Maximum Day Demand Without Conservation -- Average Day Demand With Conservation -- Maximum Day Demand With Conservation Figure 5 Annual Performance Reports Beginning in 2008, Bremerton is required to develop annual water use efficiency reports by July 1 and must send the reports to DOH, the consumers, and anyone who requests them, and make the reports available to the public. Water use efficiency performance reports must include: · Total annual water production · Annual water distribution system leakage totals · A description of Bremerton's vvateruse efficiency goals, including a schedule for achieving the goals and a narrative of progress toward achieving the goals Bremerton plans to include this information in its annual consumer confidence report. A template for this report is in the appendix to the WUEP. City of Bremerton Interim Water Use Efficiency Plan Page 20 References "Conservation Planning Requirements: Guidelines and Requirements for Public Water Systems Regarding Water Use Reporting, Demand Forecasting Methodology, and Conservation Programs", Washington State Department of Ecology and Washington State Department of Health, Health Publication #331-008, March 1994. Handbook of Water Use and Conservation, Amy Vickers, Water Plow Press, 2001. "Water Conservation Plan Guidelines", United Stated Environmental Protection Agency, Office of Water (4204) Washington DC 20460, EPA-832-D-98-001, August, 1998. Water System Plan Update, City of Bremerton, 2005. Washington Administrative Code Chapter 246-290 Section 8 (6-16-05 draft) City of Bremerton Interim Water Use Efficiency Plan Page 2\ Appendix Suggested format for annual Water Use Efficiency Reports: Water Use Efficienc Performance Re ort for 200# Efficient water use benefits the environment, public health, and economy by helping to improve water quality, maintain aquatic ecosystems, and protecting water resources. The City of Bremerton has emphasized water use efficiency efforts since the early 1990's. The City has an extensive conservation program for customers and is active in regional water use efficiency programs such as the Water Purveyors Association of Kitsap County Water and the Partnership for Water Conservation Puget Sound. 200# Total Annual Water Production 200# Water Distribution Leakage Goal Maintain water use per single family residence to below 195 gallons per day. Keep maximum day demand less than twice the average day demand. Maintain non-revenue water below 8% on a three year average (leakage is a subset of this value). ## Million Gallons ## Million Gallons per Day ##% Where the Water was Used in 200# City 46"'" Port Orchard <1% Bremerton's Water Use Efficiency Goals How Goal Was Met in 200# Water use per single family resident was ### gallons per day. Maximum day demand was ## times the average day demand. Non-revenue waster was ##% of the total water produced. Comments Goal was met - Great job by our customers! Average water use per single family residence in Westem Washington is about 220 gallons per day. Goal was met - Great job by our customers! The highest water use day was ###, 200# when ## million gallons per day was used. Goal was met - Great job by the water system! Proper operation and maintenance keeps leaks and water loss to a minimum. For more information on how you can save water in your home or business, visit www.ci.bremerton.wa.us or call 473- 5920. City of Bremerton Interim Water Use Efficiency Plan Page 22 PUBLIC WORKS & UTILITIES Water Resources Division Te/360-473-5315 Fax 360-473-5018 3027 Olympus Drive Bremerton, WA 98310 May 16, 2006 Linda Bentley Kitsap County Department of Community Development 614 Division Street Port Orchard, W A 98366 Geoffrey Wentlandt City of Bremerton Department of Community Development 345 6th Street Bremerton, W A 98337 RE: WATER SYSTEM PLAN CONSISTENCY STATEMENT CHECKLIST Dear Linda and Geoff: The City of Bremerton Water Utility is in the process of updating its Water System Plan. As we discussed a few weeks ago, water systems are now required to obtain "consistency statements" from the local governments in their service area. Although most of the Bremerton water service area is within city limits, approximately 20% of our customers are in unincorporated Kitsap County. Please fill out and sign the attached blue consistency statement and return to me before July 17, 2006. Included with this letter are draft sections of Bremerton's Water System Plan, a service area map, and section of the Bremerton Municipal Code pertaining to water service. Also attached is additional information on the consistency statement. If you need additional information, please call me at 473-2315 or Karen Klocke, Department of Health Planner, at 360-664-2999. I appreciate your attention to this new requirement. Sincerely, Kathleen Cahall Water Resources Manager Attachments Water System Plan and Small Water System Management Program Consistency Statement Checklist This checklist is intended to ensure consistency of water system planning documents with adopted local comprehensive plans and development regulations. Each local planning jurisdiction in which the water utility provides service will review the relevant water system planning information and provide a signed consistency statement to the utility for submittal to the Department of Health. If the local planning agency will not respond, the highest authority within the utility (chair of governing body, executive director of private companies,etc.) must sign to verify consistency of the plan information. Water System Name: City of Bremerton CPWS ID: Main System 08200R West 517 Zone 082374 Plan Date: 2005 Planning Document Title: City of Bremerton Water System Plan Local Planning Jurisdiction: The retail service area, and any other areas not served by a separate public water system, and land use identified in the WSP is consistent with the adopted comprehensive plan and adopted development regulations and policies. For WSPs only: The growth projection used to forecast water demand for the retail service area is consistent with the adopted city/county's population growth projections (and commercial development projection if applicable). If a different growth projection was used, the alternative growth projection and methodology proposed is acceptable based on explanation given. For WSPs only: New potential large water users (that may have a significant impact on the water system) that the city/county is aware of have been identified in the WSP. Figure 1-1 Figure 2-2 Section 2.3 Table 2-2 Section 2.3 Section 2.4.4 For city-owned systems only: All policies regarding water service outside the corporate boundaries are included in this WSP. These policies are consistent with the adopted comprehensive plan and development regulations. Where the local planning agency is unable to sign a Consistency Statement: Provide documentation of efforts to coordinate with local agencies with a 60-day timeline for local agency to respond. Include: name of contact, date, type of effort attempted, and response from local agency. I certify that the above statements are true to the best of my knowledge and that these statements support the conclusion that the subject-planning document is consistent with adopted comprehensive plans, development regulations, and other policies. Signature Printed Name, Title, & Jurisdiction Section 1.7 BMC Title 15 Date **For any issues of inconsistency, please provide comments on how they can be resolved. ** Information Prepared by the Washington State Department of Health: Water System Planning Consistency with Local Plans and Development Regulations Background Consistency with local plans has been part of the Drinking Water regulations (WAC 246- 290-100(4)(a)(iii)) since 1977. The Municipal Water Supply - Efficiency Requirements Act, Chapter 5, Laws of 2003 (Mu,nicipal Water Law), further emphasized that the Department of Health's (DOH) planning processes become more closely aligned with local comprehensive plans and development regulations. Changes to the Water Code (RCW 90.03.386) require consistency ofthe water utility's service area with local land use plans, comprehensive plans, coordinated water system plans, watershed plans, and development regulations. The new section added to the State Board of Health Code (RCW 43.20) states that water service provided to new customers must be consistent with local land use plans, comprehensive plans and development regulations. Service Areas The retail service area, and any other area not served by a separate public water system, defined in a water system plan (WSP) or small water system management program (SWSMP) depicts where a water system currently provides water service as well as where it plans to provide water service in the future. Demand Forecast WSPs forecast the water demand a water utility expects to serve within the next six years and 20-year planning horizons. Forecasting methodologies should be consistent with local planning population growth projections for the service area described in the WSP. If alternatives are used to project water demand, justification for the growth projection and methodology must be provided in the WSP. Demonstrating Consistency Prior to WSP submittal to the DOH, water systems need to work with local goverriments in whose jurisdiction they provide water service to ensure consistency. There will be two acceptable approaches to demonstrate to the DOH that consistency has been achieved: 1. The local jurisdiction( s) verifies consistency and provides documentation to DOH. 2. If a water utility has attempted to gain verification of consistency from the local jurisdiction but the local jurisdiction has not responded within 60 days, the highest authority within the water utility must provide documentation of consistency to DOH. DOH regional office planners may be able to help the utility make the appropriate contacts at the local level to obtain consistency determination. For More Information: Department of Health, Office of Drinking Water, Southwest Regional Office 360-664-0768 ;;'OiJ 5" ~JoiuL S ,/sJvrJr PIa0.. ~ fp STATE OF WASHINGTON DEPARTMENT OF HEALTH SOUTHWEST DRINKING WATER REGIONAL OPERATIONS PO Box 47823, Olympia, Washington 98504-7823 TPD Re!ay .1-80D-833-6388 October 23,2006 Kathleen Cahall City of Bremerton 3027 Olympus Drive Bremerton, Washington 98310 Subject: City of Bremerton Water System. ill #08200, Kitsap County; Water System Plan (including West 517 Zone, ID # 08273); ODW Project #06-0715 Dear Ms. Cahall; Thank you for submitting the Water System Plan (WSP) for the City of Bremerton Water System (City). The Office of Drinking Water (ODW) is encouraged by the accomplishments of the water system in producing this WSP. Prior to approval, the following specific comments must be addressed. Response to these comments should be received by this office prior to January 16, 2007. GENERAL COMl\1ENTS (response required) WATER SYSTEM PLAN 1. Page 1-7. The first paragraph has a statement that reads "The State requirement is a minimum of 0.2 mg/L at the entrance to the distribution system with detectable chlorine residual throughout the distribution system." This requirement is applicable for groundwater systems that chlorinate and not for surface water systems. The concentration required at the entrance to the distribution system is system-specific, which is baSed on the contact time calculations. In addition, ODW requires a detectable residual in the distribution system and we recommend that the minimum concentration be maintained at 0.2 mglL. Please modify or remove this indicated statement from the text in your revised WSP. 2. Page 2-19. Table 2-5 on page 2-19 does not clearly specify the units of the values that are presented. Please modify the table to include clearly dermed units in your revised 'VSP. l:.~~itu:j ~l". P/aYlI's (b7'e&t-a~ L ~~ I' ~ t.~ Kathleen Cahall October 23,2006 Page 2 3. Page 3-4. The Qi value for Well 16 in Table 3-2 is in,consistent with the values for Qi in Tables 3-5 and 3-10. Please correct any discrepancies in these tables. 4. Page 3-13. The first footnote for Table 3-5. states, "1,2,3,4 - The existing water rights are eit.1}er or both;" We do not understand t.hjs corrunent. Please explain this comment in your revised WSP. 5. Pages 6-5 to 6-7. System Operation. Please describe specific set points for alarm shutdowns and caIlouts, and submit this information in your revised WSP. 6. Pages 8-8 and 8-9. In the section titled "System Physical Capacity Analysis" there seems to be two contradictory statements regarding the limiting factor for system capacity. On page 8-8 the statement is made that storage is the limiting factor and on page 8-9 the text indicates that source capacity is the limiting factor. Please clarify this and update the text in your revised WSP. 7. Pages 7-2 and 8-15. The fire flow hydraulic analysis was done by assigning 1,000 or 1,500 gpm (each for two bours) to nodes, depending on whether the area was residential or commercial. However, on page 8-15 the text states that the fire flow requirements range from 1,000 gpm (for 2 hours) to 5,000 gpm (for 4 hours). Please explain why the maximum fire flow requirements were not included in the hydraulic modeling analysis. 8. Page 8-9. Please clarify how the storage values in Table 8-3 were derived from Tables 8-5,8:-6, and 8-12. 9. Page 8-9. Footnote #2, for Table 8-3, uses the term "firm yield for Qa". Please derme what this term means. 10. Page 8-9. In table 8-3, the value for "Total Storage Capacity (East)" is less than the value for "Equalizing Storage (East)". Please explain why the total storage is less than the equalizing storage, which is one aspect of total storage. 11. Sections 8.4.6 and 8.4.7 both mention the West 517 Zone projected storage deficiency. However, the capital improvement plan does not mention potential projects for adding storage to the West 517 Zone. It is our understanding that the deficiency will occur when developers build and that no specific projects have been defined. However, we recommend including this in the eIP table in order to avoid submitting a water system plan amendment when projects are submitted for review. Please revise your CIP and resubmit it with your revised WSP. 12. Appendix for ODW checklists. On the Water System Submittal Form, you checked no to number 16, the request for submittal exception. Yet you included the City ofBremerton's Utilities Development and Construction Standards. If you wish to have the submittal exception, please state so in your revised WSP and have the City Resolution signed and dated. 13. Appendix for ODW checklists. The Municipal Water Law, Attaclunent 5- Program Consistency Statement Checklist, was not submitted with the WSP. The Consistency Statement Checklist must be completed, and signed and dated by the county planning office Kathleen Cahall October 23,2006 Page 3 prior to final approval of the WSP. Please submit the signed and dated checklist with your revised WSP. WATER QUALITY MONITORING PROGRAMS WEST 517 ZONE WQMP 14. Addendum. The CMP needs a map showing this pressure zone with routine and repeat sites identified. Please explain where the five required samples will be collected from in the month following one or more unsatisfactory samples in your revised WSP. 15. Addendum. Repeat tests are required to be within five ACTIVE connections up-line and down-line plus one site of choice. Please revise your CMP to reflect these requirements. 16. Addendum. There needs to be a schedule of the sample rotation information. Please include this information in your revised WSP. 17. Addendum. The public notification requirements have been revised. ODW has developed a new guidance document and specific notices for your use. Copies for your use are enclosed in the red and teal folders. The notices may also be found on the ODW website at: www.doh.wa.gov/ehp/dw/coliform/coliform.htm. In addition, the federal Public Notification (PN) Handbook is available online at www.epa.gov/safewater/pws/pn/handbook.pdf. Please incorporate the new PN requirements (enclosed) and your revised CMP in your Water Quality Monitoring Program in yo'ur revised WSP. BREMERTON WQMP 18. Page 3. There was no Appendix included, though it was noted in the table of contents. Please include the Appendix information in the revised WSP. 19. Appendix A. As with the West 517 Zone, Bremerton's CMF needs a map showing this pressure zone with routine and repeat sites identified. 20. Page 6. As with the West 517 CMP, the Bremerton CMP is lacking correct public notification information. ODW has developed a new guidance document and specific notices for your use, copies for your use are enclosed in the red and teal folders. The notices may also be founl:i on the ODW website at: www.doh.wa.gov/ehp/dw/coliformlcoliform.htrn.In addition, the federal Public Notification (PN) Handbook is available online at www.epa.gov/safewater/pws/pn/handbook.pdf. Please incorporate the new PN requirements (enclosed) and your revised eMP in your Water Quality Monitoring Program in your revised WSP. 21. Page 8. As with the West 517 CMP, repeat tests are required to be within five ACTIVE connections upline and downline plus site of choice. Please revise your coliform monitoring plan to reflect these requirements. Kathleen Cahall October 23,2006 Page 4 22. Page 8. Please revise the contact phone numbers in your CMP. Sandy Brentlinger has a direct phone line number, which is (360) 236-3044, and the Southwest Regional Office general phone number is (360) 236-3030. "3 p~-- t:: lI.l__ -_..~- -":-l~~=o-" l-~-'- ~ 3(\ d~y' __~_1~~__. 11'-=" b.... r\D'IIT -~~~--e~ds e--1=e- .L .. U!:,C; U. l'1UIl-U\.,;Ulc; VIU Ul! U~ HIVc;U U U .lc;!:,UIULUIY.I UHl, Ul \J .yy lc;\..oUUllB 11 CUB 1 notification. If there is a fecal/E. coli presence, contact ODW immediately~ Beprepared to collect more than the minimum number of repeat samples. ODW asks for source, storage, and usually additional distribution samples. Please revise this portion of your eMP and resubmit it with your revised WSP. 24. Page 9. Please remove Judy Morrow as a contact for ODW. 25. Page 9. ODW prefers repeat samples, especially ifroutine fecal/E. coli, to be collected on the same day as the routine(s) were reported as positive. Also the source/storage/other distribution samples should be collected. Please revise this portion of your CMP and resubmit it with your revised WSP. 26. Page 9. If there is a fecal/E. coli routine and/or repeats, it is most likely to be an acute MCL. Please revise this portion of your eMF and. resubmit it with your revised WSP. 27. Page 11. Invalidation. If test results show that there may be a sample location/tap problem, please contact ODW and the invalidation procedure will be discussed. The system needs to be able to duplicate results of same tap positive and up-line and down-line absent samples. WATERSHED MANAGEMENT PROGRAM 28. Section VII. The Watershed Management Program (WMP) mentions that the City has a control program for beaver. Please explain the details of this Program. Please include this information in your revised WMP. 29. Section VII. Bremerton' s plans for addressing the requirements of L T2 SWTR are not described in very much detail in Section VII of the WMP. However, Section 4.5.1 of the WSP contains a detailed description ofBremerton's plans. In Section VII of the WMP, please make a reference directing readers to Section 4.5.1 of the WSP if they would IiIce to obtain detailed information about Bremerton's LT2 plans. 30. Section VII. Please describe, and locate on a map, the locations where raw water cryptosporidium samples are taken. Please note that compliance with cryptosporidium monitoring will be calculated using a running annual average of all samples collected. Ecology has not sent review comments on the City's WSP. When Ecology's comment letter arrives, we will send a copy to you under separate cover. Please remember that ODW's approval of your WSP will not provide any guarantee, and should not be considered to provide any guarantee concerning legal use of water or subsequent water rights decisions by Ecology. Depending on Ecology's future actions on your water rights, additional planning or other submittals may be required by ODW. Kathleen Cahall October 23, 2006 Page 5 Thank you for submitting your WSP for review. Regulations establishing a schedule of fees for review of planning, engineering, and construction documents were adopted July 11, 2004 (WAC 246-290-990). An itemized invoice for $5,503 is enclosed. ----------If-you-have-any-questions,please-contact-Regional-ElannerKarenKlocke at (360) :23 6- 3031 or, Regional Engineer Regina Grimm at (360) 236-3035. Sincerely, ~1~4 KAREN KLOCKE Office of Drinking Water Regional Planner Enclosures cc: City ofBremerton, West 517 Zone, ill # 08273 Kitsap County Health Department Kitsap County Planning Department Paul Fabiniak, Department ofEcoIogy-NWRO Virpi Salo-Zieman, ODW Bonnie Waybright, ODW Bremerton~s Response to DOH Comments on the 2005 Water System Plan Update Water System Plan . . I # Page Summary of DoH Comment Bremertc:m Response 1 Action -c- '. '. '. . I Non€needed as I I Modify statement about minimum Email sent to Regina 11- 1-06 indicating that is I reQulation is I 1 I 1-7 entry point chlorine residual of 0,2 I presen~e? .. I how we read WAC 246- I mgiL I I I 290-692(3) and (4) I accuratelY In me I WSp, I I 121 Table ?-~ doec not Clearly cnecify uERUs" is in the table's T Additional note on 1 2-19 1 unit~ ~ ~ w,. '''' ,. ~t-' .. title I unit~ wa: added to Table 2-0, 3 3-4 Well 16 Qi value inconsistent in There is no table 3-10. Table 3-2 was Tables 3-2,3-5, and 3-10 corrected. Need more explanation why the Ecology applied wellfield A better I explanation was 1 4 3-13 water rights for some wells are considerations for these added to Tab!e 3-5 I combined pairs of wells and 3-6. I I I We did not think this I I I I level of detail was ! Enclosed is a I I I r::. 6-5 - 7 Request more information on set appropriate for the WSP I submittal of a I .... points and set points change separate SOP on I depending on season . system set points. I I and system condition. ! 61 The correct answer is we This has been 8-8 - 9 Storage capacity inconsistency corrected in the I i are limited by storage WSP, I I 1000 gpm and 1500 gpm I I ' are the minimum required I I I fire flows for residential ::In 1 I I I I I I I I I I I ..., 1 7-2 and 8- 1 Questioned method used for fire I 115 I flow analysis I I I I I I I I I I I ! . I I I I I I -. d I commercial buildings respectively per the 2003 I IFe. and these values are I used for hy?raulic ~odeiing I I performed ior planning I purposes. Individual I I b~i~ding.s n;ay re~uire I I hlgner fire rlows D8sed on I -.1 h~ . ...._.... I size and type of 11'10 C .ange neeu\:::u. I construction per iFe table I I B 105.1. A.ctual fire flow I 1 requirements are used in I : hydrauiic modeling for i I sr'\Of"'lf'IC Droiocto::: "'nd 'In I ! ,.....-..... . I. J..... -.;..... II I i determining the amount of I I fire SUDoression storaae i ! reqUjr~d in a pressure.... I I ' i 7nnc I i ~~..~. I I I 24 9 Remove contact This has been corrected. 25 9 Revise wording regarding repeat This has been samples revised. Revise wording regarding Acute . . This has been 26 9 coliform violations revised. 27 11 Call. DOH regarding invalidation This has been . . of samples revised. . WATERSHED MANAGEMENT PLAN . . . .. 28 Section VII Please explain the control SOP has been proaram for beavers included. 29 Section VII Refer to the WSP regarding L T2 This has been requirements revised. 30 Section VII Provide a map of Crypto This has been samolina ooint included. I-'ruJec ear roposeo Number Needed By Model Pipe ID Diameter (in) Existing Diameter (in) Length (ft) 80st From (Along) At To At P-14 2006 P-10989 W517 Transmission Main 12 8 3475 $ 500,400 P-15 2006 P-1430 W517 Transmission Main 12 8 147 $ 21,168 P-16 2006 P-1471 W517 Transmission Main 12 8 1501 $ 216,144 Aero Mobile Estates P-17 2006 P-1472 W517 Transmission Main 12 8 1271 $ 183,024 Aero Mobile Estates P-18 2006 P-33 W517 Transmission Main 12 8 785 $ 113,040 P-19 2006 P-46 W517 Transmission Main 12 8 878 $ 126,432 Golf Course? P-20 2006 P-601 ,W51 Transmission Main 12 8 2283 $ 328,752 Port? Proiect Subtotal 10,340 $ 1,488,960 P-21 2006 P-1624 Crawford/Dead-end Line 8 6 519 $ 49,824 Crawford Avenue NE->N bend Crawford Avenue N->NW bend P-22 2006 P-1625. . CraWfO":1/oead~nd Line 8 6 411 $ 39,456 Crawford Avenue N->NW bend Crawford Avenue Dead end Prolect Subtotal 930 $ 89,280 P-23 2006 P-3076 Halverson Loop - 2011 8 6 732 $ 70,272 Halverson Avenue East 31 st Street Halverson Avenue East 30th Street P-24 2006 P-10033 Gorst 12 6 802 $ 115,488 Riverside Avenue W W Frontaoe Road W Pleasant Street Hawthorne Avenue W P-25 2006 P-877 IGorst 12 8 1076 $ 154,944 W Frontage Road Bend in W Frontage Road W Frontage Road Riverside Avenue W Prolect Subtotal 1,878 $ 270,432 P-26 2006 P-7073 Austin Dr. - 2011 10 8 1750 $ 210,000 State Hiohwav 3 NW->N bend State Hiohwav 3 1750ft N of bend Anderson Hill/Dead-end Line - ~ 2006 P-10028. 2011 . 12 6 1260 $ 181,440 Anderson Hill Road SW SW Cook Road 1260ft S of SW Cook Road P-28 2006 P-1303 Lewis.Ave. Loop 8 6 549 $ 52,704 Yew Street 900ft NE of Hefner Street Savles Road Lewis Avenue P-29 2006 P-1304 eWls.Ave. Loop 8 6 270 $ 25,920 Lewis Avenue Sayles Road Lewis Avenue Sheridan Road (E intersection) ProlectSubtotal 819 $ 78,624 P-30 2006 P-5053 PS14 suction 8 4 239 $ 22,944 ? Marlow Avenue W->N turn P-31 2006 P-542 PS14 suction 10 6 914 $ 109,680 Windfield Avenue East 10th Street Windfield Avenue 50ft S of East 18th Street P-32 2006 Clp.12794 New Pipe/Close Looo 8 1204 $ 115,584 Oranne Dr NW NWTa 10rRd Oranae Dr NW Sea beck Hinhwav P-33 2006 P-1539 New Pipe 6 508 $ 36,576 Clooston Avenue N N.E. Flagstone Lane Clooston Avenue N NE Roswell Drive P.34 2006 P-1593 New Pipe 12 1017 $ 146,448 Pine Road N.E. Flaoslone Lane Pine Road NE Pi eWQod Drive P-35 2006 P-1594 New Pipe 8 112 $ 10,752 Pine Road N.E. Flagstone Lane Pine Road 112ft S of N.E. Flaostone Lane P-36 2006 P-527 New Pipe 8 4 758 $ 72,768 PH10 North Lake Way NW PH10 Dead End P-37 2006 P-4153 Mise 8 4 248 $ 23,808 Robin Avenue Dibb Street Robin Avenue East 32nd Street P.38 2006 P-50GO Mise 10 6 295 $ 35,400 Winfield Ave Easl15th SI Winfield Ave East 16th St P.39 2006 P-623 Mise 12 8 466 $ 67,104 Port? P-40 2006 P-7024 Marine Drive 8 6 2900 $ 278,400 Marine Drive Cedar Drive Marine Drive Fitz Drive P-41 2006 P-311 Jacobson/Cascade Trail area 10 6 2605 $ 312,600 Jacobson Boulevard Trenton Avenue Jacobson Boulevard NE Alder Street P-42 2006 P-1503. Dead-end Line 8 6 1203 $ 115,488 Kilsa-n Way Bav Avenue Kilsao Way National Avenue P-43 2006 P-1519. Dead-end Line 8 6 898 $ 86,208 Kitsao Wav Burchfield Drive Kitsao Way 900ft SE of Burchfield Drive P-45 2006 P.523. Dead.end Line 10 8 1419 $ 170,280 North Lake Way NW 1419ft S of Lebers Lane NW North Lake Way NW Lebers Lane NW P-46 2006 P-565. Dead-end Line 8 6 352 $ 33,792 Junioer Morrison Court Juni er Dead End P-47 2006 P-1152 FUTURE 3 789 $ 28,404 E 18th Street Perry Avenue E 18th Street Winfield Avenue Project Subtotal 15,927 $ 1,666,236 2005 Water System Plan Appendix City of Bremerton Proposed Distribution Capital Improvement Projects 2006 through 2011 Projects 6.Year Subtotal 4,055,244 2011 through 2024 Projects P-100 P-101 P-102 P-103 2011 P-3077 Halverson Loop - 2024 8 6 445 $ 42,720 Halverson Avenue East 30th Street Halverson Avenue Sheridan Road 2011 P-3078 Halverson Loop - 2025 8 6 309 $ 29,664 Sheridan Road Halverson Avenue Sheridan Road Sanders Avenue 2011 P-3079 Halverson Loop - 2026 8 6 545 $ 52,320 Sanders Avenue Sheridan Road Sanders Avenue East 30th Street 2011 P-3080 I Ha verson Loop - 2027 8 6 351 $ 33,696 East 30th Street Sanders Avenue Sanders Avenue Halverson Avenue Proiect Subtotal 1,650 $ 158,400 P-104 P-105 2011 P-1235 2011 P-1241 6 6 Pro ect Subtotal 484 $ 2011 P-7074 Austin Drive - 2024 12 8 379 $ 54,576 State Hiwav 3 Turnquist Rd State Hiway 3 NW -> Bend 2011 P-10027 Anderson Hill - 2024 12 8 845 $ 121,680 Anderson Hill Rd SW Dead-end Anderson Hill Rd SW SW Cook Rd 2011 P-881 Garst Dist - 2024 12 8 722 $ 103,968 W Frontaae Road. State Hiohwav 16 W Frontaoe Road 60ft E of Feialey Road W 2011 P-882 Garst Dlst - 2025 12 8 91 $ 13,104 W Frontage Road 30ft W of Feigley Road W W Frontage Road Bend in W Frontage Road Prolect Subtotal 813 $ 117,072 New W4401W256 Zone 2011 ReserVoir 2.0MG $ 2,500,000 2011 New W517 Zone Reservoir 2.0 MG $ 2,500,000 P-106 2011 P-1045 Bender Circle P-107 P-108 P-109 P-110 R-101 R0102 6- to 20-Year Subtotal 20-year Total .Restores fire flow to a dead end node Pipe cost based on $12 per inch diameter per foot 403 $ 341 $ 744 $ 38,688 Lewis Avenue Sheridan Road W intersection Lewis Avenue Sa les Road 32,736 Sheridan Road Lewis Avenue (E intersection) Sheridan Road Lewis Avenue (W intersection) 71,424 46,464 Bender Circle NE Intersection Stem & Loa Bender Circle NE NE Foster Road $ 5,569,616 9,624,860 AFFIDAVIT OF PUBLICA nON Account # 37922 / Ad # 187801 ST ATE OF WASHINGTON COUNTY OF KITSAP I, Sarah Weller, being first duly sworn on oath, deposes and says: That she is now, and at all times embraced in the publication herein mentioned was the principal clerk of the printers and publishers of KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court of the County of Kitsap, in which County it is published and is now and has been for more than six months prior to the date of the publication hereinafter referred to, published in the English language continually as a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County, Washington and is now and during all of said time, was printed in an office maintained in the aforesaid place of publication of said newspaper; that the following is a true text of a legal advertisement as it was published in regular issues (and not in supplement form) of said newspaper on the following dates, to wit: , January 3, 2006 and that such newspaper was regularly distributed to its subscribers during all of said period. That the full amount of the fee charged for the foregoing publication is the sum of $27.45 which amount has not been paid in full. ~~~ (Signature of Principal Clerk) Subscribed and sworn to before me this day of January 9, 2007 ORDINANCE NO. 4992 o/-ei Notary Public in and for the State of Washington, Kitsap County. AN ORDINANCE of the City Council of the City of Bremerton, Washington repealing Ordinance No. 4755 and adopting the City of Bremerton 2005 Water System Plan update. PASSED by the City Council the 20th day of December, 2006 The full text of this ordinance is available from the City Clerk's Office, 345 Sixth Street, Suite 600, Bremerton, W A 98337. January 3, 2007.........................AD #20026689 'r:-;"\C" , - \ '~.' .~ '...' .