ORDINANCE NO. 4q q ~
AN ORDINANCE of the City Council of the City of
Bremerton, Washington repealing Ordinance No. 4755 and
adopting the City of Bremerton 2005 Water System Plan update.
WHEREAS, the City of Bremerton last updated its water system plan in 1999 by
adoption of Ordinance No. 4755; and
WHEREAS, the City desires to plan for the future and growth in its water system
service area; and
WHEREAS, a water system plan provides a means to meet future water system
needs; and
WHEREAS, the City is required to formally adopt a Water System Plan under
Washington State Department of Health regulations promulgated under Washington
Administrative Code 246-290-100 and Bremerton Municipal Code 15.02.020; NOW
THEREFORE,
THE CITY COUNCIL OF THE CITY OF BREMERTON DOES HEREBY ORDAIN
AS FOLLOWS:
SECTION 1. Ordinance No. 4755 is hereby repealed in its entirety.
SECTION 2. Adovtion. That the attached City ofBremerton Water System Plan
be adopted.
SECTION 3. Severability. If anyone or more sections, subsections, or
sentences of this ordinance are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this ordinance and the same shall remain in full
force and effect.
SECTION 4. Effective Date. This ordinance shall take effect and be in force ten
(10) days from and after its passage, approval and publication as provided by law.
PASSED by the City C<,>uncil the cdl fbI.~
day of /f-'l';~ {.~ ,2006
X'~~
CECIL Mc ELL, Couricil President
I
Water System Plan
Approved this~O.i;( J day of JlP L~;.1-lAJ ,2006
~ZEMAN' Mayor
--
APPROVED AS TO FORM:
~::~H~~
PUBLISHED the ,3A.L day of
EFFECTIVE the /3:t:Ju day of
ORDINANCE NO. .y'99~
~:;~~;;~
,2006
,2006
R:\Legal\Legal\Ordinances\Public Works & Utilities\Water System Plan.doc
2
Water System Plan
1iAbl\'c.. \Nor 5 I\-c{MAl\('
2005
City of Bremerton
Water System Plan
Main System #08200R
and
West 517 Zone S'ystem #082734
DECEMBER 2006
City of Bremerton
Department of Public Works and Utilities
3027 Olympus Drive
Bremerton; WA 98310
Certification
This 2005 City of Bremerton Water System Plan was
prepared under the direction of the following registered
professional engineers:
#ZV-~
Michael C. Mecham, P.E.
City of Bremerton
City Engineer
~.
. ,I ;.
/ " -
[#fA 1H11~ ~
,.
Melinda J. Friedman, P.E.
HDR Engineer, Inc.
Project Manager
,d
/J' ,1 t-n
"(rp-
Douglas C. Howiel P.E.
HDR Engineering! Inc.
Project Engineer
lB.,.
~
City of Bremerton
2005
Water System Plan
~
Introduction and Water
System Description
2
Planning Background
Information
3
Sources of Supply
.
4
Water Quality Review and
Regulatory Compliance
5
Transmissjon and
Distribution System
6
Operations Program
7
Performance and Design
Criteria
8
System Analysis
9 Capital Improvement Plan
\... ./
r 10 Financial Plan l
l )
2005 Bremerton Water System Plan
TABLE OF CONTENTS
Acronyms and Abbreviations .. ........ ................. ... ....... .................................. ....... ... .............. x-i
Meeting Bremerton's Water System Needs, An Executive Summary of the Water Supply
Plan Update
Introduction. ...........................................................................................................................
Purpose of the Update............................................................................................................
Forecasting the Growth of Water Demand ............................................................................ 11
Meeting Future Needs: Planning for Conservation and Water Supply Strategies................. III
Recommended Capital Improvements and Financing Plan................................................... III
Looking Toward the Future. ................. ............ ........ .......... '" ............ ........ ...... ......... ............. IV
For More Information........ .................................................................................................... IV
Section 1 - Introduction and Water System Description
1.1 Introduction... ... .................. ...................... ................................................ ..................... 1-1
1.2 Water System Planning Objectives...... ........................................... ....................... ....... 1- 2
1.3 Water System Plan Background ....................................... .......... ............ ..... ................. 1-3
1.4 Bremerton Water System History... .......................................... .................................... 1-4
1.5 Overview of Existing System......... ... ...... ................... .................................................. 1-5
1.5.1 Sources of Supply.. ......................................... .................................................. 1-5
1.5.2 Hydraulic Gradients and Pressure Zones.......................................................... 1-6
1.5.3 Storage Facilities............. .... ...... ....................................................................... 1-8
1.5.4 Pump Stations................................................................................................... 1-8
1.5.5 Transmission and Distribution Piping ......... ........... ...... .................................... 1-9
1.5.6 Telemetry and Controls .................................................................................... 1-9
1.6 ExistinglFuture Service Area................. ....................................................................... 1-9
1.6.1 Service Area Agreements ..... ......................... ................. ......................... .... .... .1-1 0
1.6.2 Service Area Characteristics............................................................................ .1-14
1.7 Service Area Policies........................ ........ .......................................... .......................... 1-14
1.7.1 Kitsap County Resolution Adopting the Coordinated Water System Plan ......1-14
1.7.2 Bremerton Municipal Code Regulating City Utility Operations......................1-15
1. 7.3 Outside Service Area Policy.............................................................................1-15
1.8 References..................................................................................................................... 1-15
Section 2 - Planning Background Information
2.1 Existing/Future Service Area...... ..... .... ................ ......................................................... 2-1
2.1.1 Bremerton Service Area within City Limits..................................................... 2-1
2.1.2 Bremerton Service Area in Unincorporated Kitsap County............................. 2-2
2.1.3 Land Use........................................................................................................... 2-2
Table of Contents
1
2005 Bremerton Water System Plan
2.2 Related Plans and Requirements .... ........ .... ... ....... ..... ........... ........... ....... .... .... .... ..... ..... 2-5
2.2.1 City and County Comprehensive Plans under the Growth Management Act.. 2-5
2.2.2 Municipal Water Law...... .......... ... ........ ............ ..... ...... ........... .............. ...... ..... 2-8
2.2.3 Other Related Plans ..... ....... ...... ...... ... ........... ..... ............ .... ......... ... ............... ..... 2-9
2.3 Population Estimates for the Bremerton Water Supply Area.......................................2-10
2.4 Water Production and Demands .... ....... ......... ...... ...... ..... ... ...... ............... ......... ..... ........2-12
2.4.1 Maximum Day Demands ... ...... ....... ......... ..... ......... ........ ............ .... ..... ...... .......2-16
2.4.2 Non-revenue Water. ....... .... ........ .... ..... ................... .... .................. ...... ..... .... ..... 2-22
2.4.3 Equivalent Residential Units ..... ...... ......... ........... ...... ... ... ........... ......... ............. 2-22
2.4.4 Commercial/Industrial Demands ... ......... ........ .......... ....... ....... ..... ....... .............2-23
2. 5 Water Forecasts............................................................................................................ 2-23
2.5.1 Forecast without Conservation. ...... ........................ ......... ............. .... ... ...... .......2-25
2.5.2 Forecast with Conservation ........ .... .... ...... ........ ...... ... ....... ...... ..... ...... .......... .....2-26
2.6 References................................................. .................................................................... 2-28
Section 3 - Sources of Supply
3.1 Introduction. .......................................................... ....................................................... 3-1
3.2 Water Sources............ .................... ....... ........ ...................................... ........... ............... 3-1
3.2.1 Surface Water Sources ........... ...... ...... .... ....................... ....... .................... ...... 3-1
3.2.2 Groundwater Sources ............... ...... ................................. ................. ................ 3,..2
3.3 Enhanced Conservation Measures.................................................. .............................. 3-5
3.4 Water Rights Evaluation....................... ........ ...... ........... .............. ................................. 3-8
3.5 Interties ..... ............................... ..................................................................................... 3-21
3.6 Aquifer Recharge........ '" ............................................................................................... 3-22
3. 7 Water Reuse..................................................................................................... ..... ........3- 22
3.8 Treatment............................. ................................. ........................................... .............3-22
3.9 Climate Change ........................... ......... ...... ................ ................. ........... ......................3-23
3.1 0 Water System Reliability Analysis....................... ............. ..................... ........ ..............3-24
3.10.1 Source Reliability - Water Quantity........ .............................. ........... ...............3-24
3.10.2 Source Reliability - Water Quality...... .... ......... .............. .................................3-25
3.10.3 Water Right Adequacy.. .......... .......... ...... ......... .............. .......... ........ ... ............3-26
3.1 0.4 Facility Reliability..... ........................................ ..............................................3-26
3.10.5 Customer Service Reliability.. ........ ................................................. ...... .........3-27
3.11 References ................. .................... ....................... .................................. .... ..................3-28
Section 4 - Water Quality Review and Regulatory Compliance
4.1 Objective and Approach ........ ............... ........ ............................... ........... ........ ....... ....... 4-1
4.2 Description of State and Federal Regulatory Framework............................................ 4-1
4.2.1 Safe Drinking WaterAct................................................................................... 4-1
4.2.2 Washington Administnitive Code ....... ..... ..... ............. ...... '" .:.. .............. .... ........ 4-1
4.3 System and Supply Overview...................................................................................... 4- 2
Table of Contents
2
2005 Bremerton Water System Plan
4A Water Quality Regulations........................................................................ .......... .......... 4-3
4A.l Phase I, II, and V Rules ..................................................................................... 4-3
4.4.2 Arsenic Rule........... .......... .......... ............. ....................... ........ .............. ............. 4-6
4A.3 Radionuclides Rule. ...... .... ..... ........ .......... ............................... ........................... 4-6
4A.4 Lead and Copper Rule ....................................................................................... 4-7
4 .4.5 Wellhead Protection Program............................................................................ 4-9
4A.6 Total Coliform Rule........ ............................. ......................... ....... ......... ........... .A-l 0
4 A. 7 S urface Water Treatment Rules................. .................................................... ..A-II
4.4.8 Stage 1 Disinfectants/Disinfection By-Products Rule......................................A-17
4A.9 Consumer Confidence Reports and Public Notification Rule..........................A-20
4.4.10 Operator Certification......... ............................. ................................................ .A- 21
4.5 Promulgated Water Quality Regulations.................................................................... .A- 21
4.5.1 Long Term 2 Enhanced Surface Water Treatment Rule ..................................A-22
4.5.2 Stage 2 Disinfectants/Disinfection By-Products Rule.......................................4-24
4.6 Anticipated Regulations.............................................................................................. .A- 26
4.6.1 Unregulated Contaminant Monitoring Rule 2...................................................4-27
4.6.2 Radon Rule....................................................................................................... .4-28
4.6.3 Lead and Copper Rule Revisions ........ ...................................... ....................... A- 28
4.6.4 Groundwater Rule............................................................................................. 4- 29
4.6.5 Total Coliform Rule Revisions............. ............. ............................................... A- 31
4.6.6 Potentially Regulated Contaminants.............................................. ....;....;.;..;.. .A- 33
4.7 Summary of Regulatory Status.... ............ ........... ......................................... ................ A- 33
4.8 Laboratory Certification................................................................................................ 4-41
4.9 References..................................................................................................................... 4-41
Section 5 - Transmission and Distribution System
5.1 Introduction................................................................................................................... 5-1
5.2 Pressure Zones ...................... ................. .................. ..................................................... 5-1
5.3 Control Valves ....................................................................................................... ....... 5-3
5 A Interties with Other Water Systems ....... ....................................................................... 5-3
5.5 Pump Stations .. ... .... .......... ..........,.... .....;........................;.. .............. .... ..... .......... ........... 5-6
5.6 Transmission and Distribution Piping ........ ................................................. ................. 5-9
5.6.1 Transmission Piping.... ................. ..................................................................... 5-9
5.6.2 Distribution Piping............................................................................................ 5-10
5. 7 Storage.......................................................................................................................... 5-11
Section 6 - Operations Program
6.1 Water Utility Organization ......... .................................................................................. 6-1
6.1.1 Responsibilities........,......... ................................................................................ 6-1
6.1 .2 Certi fi cati ons ..................................................................................................... 6-4
Table of Contents
3
2005 Bremerton Water System Plan
6.2 System Operation and Control..... ......... ......... .... ............. ............ ..... ........ ..... ............... 6-5
6.2.1 Components. ..... .... .... ....... ............................................................. .......... ........... 6-5
6.2.2 Normal and Alternative Operation.................................................................... 6-5
6.2.3 Surface Supply Operations at the McKenna Falls Intake Facility.................... 6-5
6.2.4 Groundwater Supply Wells ............................................................................... 6-6
6.2.5 Storage Reservoirs.... .......... ..... ................ ............... ......... ..... .... ..... ........... ........ 6-6
6.2.6 Pump Stations............ ........ ........ ...................... ...... ............................. ............... 6-7
6.2.7 Telemetry and Controls ........................................... ......... ..... .... ........................ 6-7
6.2.8 Preventive Maintenance Pro gram..................................................................... 6-7
6.2.9 Equipment, Supplies, and Chemical Inventory ................................................. 6-7
6.2.10 Fluoridation............... ........................................................................................ 6-8
6.3 Water Quality Control and Monitoring ........................................................................ 6-8
6.3.1 Source Water Quality Protection ...................................................................... 6-8
6.3.2 Routine Procedures .. ................. ....... ............ ..................................................... 6-8
6.3.3 State Reporting................. ................................................................................. 6-9
6.3.4 Treatment and Monitoring Violation Procedures ............................................. 6-9
6.4 Valve Maintenance......................... ........................................................................... ... 6-9
6.5 Hydrant Maintenance .............................................................................. ..................... 6-9
6.6 Flushing Program.. ...................................................... .............................~ ................... 6-9
6.7 Customer Response and Education Program ...............................................................6-10
6.8 Cross-Connection Control Program ........................ .....................................................6-10
6.8.1 Cross-Connection Control Program Elements .................................................. 6-12
6.9 Safety Program.. .................. ........... .............................................................................. 6-18
6.10 Training ... ...... ...................... ........................................................................ .................6-18
6.11 Involvement in Professional Organizations......... ....................... ...... ............................6-19
6.12 Other Operation and Maintenance Responsibilities ............................. ........................6-19
6.13 Emergency Response Program.................................... ..... ................. ...........................6-19
6.13.1 Standby Personnel List.................................... ..... .................... .......................6-19
6.13.2 Vulnerability Analysis and Emergency Planning ...........................................6-19
6.14 Operation and Maintenance Improvements...... ....... ............................. ........................6-21
6.15 References.............................................. ...................................................................... 6-21
Section 7 - Performance and Design Criteria
7.1 System Demands ................. ..................... ..... ...... ......................................................... 7-1
7.2 Pipe Sizing Parameters........................... .................................................... .................. 7-1
7.3 Fire Flow Standards.......................,...... ...,.................................................................... 7-1
7.4 Backup Supply/Systems......................................................................... ...................... 7-2
7.5 System Design Standards ............................................................................................. 7-3
7.5.1 General....................... .....,... .,..... ......................................................................... 7-3
7.5.2 Pipelines............................................................................................................ 7-4
7.5.3 Automatic Control Valves -Pressure Regulating, Reducing, and Relief......... 7-5
7.5.4 Transmission and Distribution Piping Valves................................................... 7-5
7.5.5 Fire Hydrants........................................................ ............................................. 7-5
7.5.6 Disinfection and Testing................................................................................... 7 - 5
Table of Contents
4
2005 Bremerton Water System Plan
7.5.7 Cross-COlmection Control.. .......................... ...... ....... ............ ........... ...... ....... .... 7-6
7.5.8 Other Guidance Standards...................................... .......................... ................. 7-6
Section 8 - System Analysis
8.1 Hydraulic Analysis.. .... ..... ...... ............. .... .........:....... .... ...... ............... ......... ....... ............ 8-1
8.1.1 Methodology.... ...... ....... ... ........ .... ...... ..... ...... .... ...... ... ......... ... ................. ...... ..... 8-1
8.1.2 System Components ............... ........ .............. .... ...... ........... .... ........ .......... ....... '" 8-1
8.1.3 Current System Demand.. ...... ............. ........ ...... ...... ........ ....... ... ... ... .............. ..... 8-1
8.1.4 Calibration.............. ........................................................................................... 8-2
8.1.5 Future System Demand ... ...... ...... .... ....... ............ .... ........... .... ...... ...................... 8-4
8.1.6 Modeling Scenarios........................................................................................... 8-5
8.2 System Physical Capacity Analysis.. ......... .......... ....... ....... ........... .... ...... ... ....... ......... ... 8-8
8.3 Fire Flow Analysis.................... ..................................: ....:........................................... .8-13
8.4 Storage Analysis........... ............................................................................. ...................8-14
8.4.1 Operational Storage.................. ......................................................................... 8-14
8.4.2 Equalizing Storage................. ...... ......... .... ...... .......,....,........... ............................8-15
8.4.3 Standby Emergency Storage................. .... .... .................. ............. ................. .....8-15
8.4.4 Fire Suppression Storage.............................. ................................... ............. .....8-16
8.4.5 Dead Storage .. .... .................... ............................................ ........... .... ................ 8-16
8.4.6 Bremerton System Evaluation................................ ... ................... ..... ............... .8- 33
8.4.7 Storage Recommendations .... ...... ......... ................................................ ............ .8- 35
8.5 Reference............................... ....................................................................................... .8- 36
Section 9 - Capital Improvement Plan
9.1 The Capital Planning Process ...................... ... ............................... ... ................ ........ ..... 9-1
9.2 Identification of Recommended System Improvements................................................ 9-1
9.3 CIP Schedule............. ......................... ...................................... ...................................... 9-2
Section 10 - Financial Plan
10.1 Introduction................................................................................................ ....................10-1
10.1.1 Past Financial History........... ....................................................... ...................10-1
10.1.2 Development of the Financial Plan. ...... .................. ....................... ............. ...1 0-2
10.1.3 Revenue.......................................................................................... ................10- 2
10.1.4 Expenses............................................................................ ............. ................10- 3
10.1.5 External Sources of Funds for Capital Projects..............................................l0-5
10.1.6 Internal Sources of Funding for Capital Projects ...........................................10-8
10.1.7 Summary of the Financial Projections....... .......... ......... .......... ........... .............1 0-9
10.1.8 Reserve Levels................................................................................................10-10
10.1.9 Review of the Existing Water Rates.. ........ .......... ......... ..... ......... ....... .......... ...1 0-11
10.1.10 Overview of Future Water Rates ................. ........ ........................... '" .......... ...10-12
10.1.11 Conservation-Based Rate Design Options ......:..................__..__......................10-13
1 0.1.12 Summary.......... ............... ...... ............... ...... ...... .... ......... ..... ........ ........ .............1 0-14
10.2 References ...... ........ ............. .......... ........... ... ..... .............. ....... ..... ............... ....... ........ .....10-14
Table of Contents
5
Figure 1-1
Figure 1-2a
Figure 1-2b
Figure 2-1
Figure 2-2
Figure 2-3
Figure 2-4
Figure 2-5
Figure 2-6
Figure 2-7
Figure 2-8
Figure 2-9
Figure 2-10
Figure 2-11
Figure 3-1
Figure 3-2
Figure 4-1
Figure 4-2
Figure 6-1
Table 1-1
Table 1-2
Table 1-3
Table 1-4
Table 1-5
Table 2-1
Table 2-2
Table 2-3
Table 2-4
Table 2-5
Table 2-6
Table of Contents
2005 Bremerton Water System Plan
LIST OF FIGURES
City of Bremerton Location
City of Bremerton Water System West Side Overview
City of Bremerton Water System East Side Overview
City of Bremerton Eventual Growth Proposal 2004 Comprehensive Plan
City of Bremerton Land Use Map
Residential Population History and Forecast
City of Bremerton Historical Annual Water Production
City of Bremerton Water Demands
City of Bremerton 1999-2004 Average Water Use by Customer Class
City of Bremerton 1999-2004 Average Water Use by Location
Puget Sound Naval Shipyard Water Use 1975 - 2004
City of Bremerton Historical Water Use and Demand Forecast
City of Bremerton West 517 Zone Water Use Forecast Average Day Demands
City of Bremerton Public Works and Utilities Non-revenue Water
City of Bremerton Average Day Demand Analysis 2005 - 2024
City of Bremerton Maximum Day Demand Analysis 2005 - 2024
Maximum Daily Turbidity of the Union River Water Supply
Main System Disinfection Byproduct Monitoring Results
City of Bremerton Department of Public Works and Utilities Organization Chart
LIST OF TABLES
Water Systems Served by the City of Bremerton
Bremerton Water system Summary
City of Bremerton Water System Agreements and Contracts
Rocky Point Water District Water System Contractual Responsibilities
U.S. Navy: Shipyard and Jackson Park Water System Contractual
Responsibilities
Plans Related to Water System Planning
Residential Population Forecasts City of Bremerton Main System Water Supply
Area
20-year Water Production History
City of Bremerton Main System and Contracted Water Sales
City of Bremerton Main System Historical <Lnd Projected Water Use by Type of
Use in ERU
West 517 Zone Historical and projected Water ADD in MGD
6
Table 2-7
Table 2-8
Table 2-9
Table 2-10
Table 2-11
Table 3-1
Table 3-2
Table 3-3
Table 3-4
Table 3-5
Table 3-6
Table 3-7
Table 3-8
Table 3-9
Table 4-1
Table 4-2
Table 4-3
Table 4-4
Table 4-5
Table 4-6
Table 4-7
Table 4-8
Table 4-9
Table 4-10
Table 4-11
Table 4-12
Table 4-13
Table 4-14
Table 4-15
Table 5-1
Table 5-2
Table 5-3
Table 5-4
Table 5-5
Table 6-1
Table 8-1
Table 8-2
Table 8-3
Table 8-4
2005 Bremerton Water System Plan
ERU Calculation for the Bremerton Water Service Area
City of Bremerton Main Water System
Bremerton West 517 Zone System
Proposed Large Commercial/Industrial Development in the Bremerton Water
Service Area
Water Conservation Goals and Achievements 1999 - 2004
Groundwater Sources for the Bremerton Main System #08200R
Groundwater Sources for the Bremerton West 517 Zone System #082734
Bremerton Conservation Practices
Water Efficiency Requirements
Water Rights for Existing Condition
Water Rights for Future Condition (2024)
Analysis of Existing and Future Water Demands and Water Rights
City of Bremerton Interties with Outside Water Systems
Potential Impact of Climate Change on Water Supply
Summary of City Sources of Supply
Safe Drinking Water Act Rules
Main System Lead and Copper Rule Monitoring Results
West 517 Zone Lead and Copper Rule Monitoring Results
Surface Water Treatment Rule Criteria for Filtration Avoidance
Promulgated Rules under the Safe Drinking Water Act
Stage 2 DBP Rule Compliance Schedule
Anticipated Regulations under the Safe Drinking Water Act
Proposed Revisions to the Lead and Copper Rule
Summary of Applicable Existing and Promulgated Regulations
Summary of Water Quality Monitoring Requirements
Sampling Schedule for Main System (2006 through 2011)
Sampling Schedule for West 517 Zone (2006 through 2100)
Summary of Analytical Costs for Continued Regulatory Compliance ($2006)
Laboratories Used by the City of Bremerton for Drinking Water Analysis
General Pressure Zone Information
Bremerton Main System Control Valves
City of Bremerton Main System Pump Stations
City of Bremerton Main System Pipe Inventory
City of Bremerton Main System Summary of Water Storage
Water Utility Management and Supervisory Personnel Water Certifications as of
December 2005
Hydrant Flow Test Results
City of Bremerton Hydraulic Model Summary of Fire Flow and Peak Hour
Scenario Base Conditions
Bremerton Water System Physical Capacity Documentation
Evaluation of Source Adequacy for Bremerton Water System
Table of Contents
7
Table 8-5
Table 8-6
Table 8-7
Table 8-8
Table 8-9
Table 8-10
Table 8-11
Table 8-12
Table 8-13
Table 10-1
Table 10-2
Table 10-3
Table 10-4
Table 10-5
Table 10-6
Table of Contents
2005 Bremerton Water System Plan
Evaluation of Storage Adequacy for Bremerton Water System Western Pressure
Zones
Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone
West 440
Evaluation of Storage Adequacy for Bremerton Water System Pressure Zones
West 256 and West 440
Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone
West 650
Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone
East 490
Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone
East 398
Evaluation of Storage Adequacy for Bremerton Water System East Pressure
Zones
Evaluation of Storage Adequacy for Bremerton Water System Pressure Zone
West 517
Bremerton Water system Summary of Storage Evaluation
Water System Financial History
Funding Agency Contacts
Summary of the City's Projected Six-Year Financial Plan
Overview of the City's 2006 Monthly Retail Water Rates
Example of the Development of Fixed Meter Charges Based Upon Meter
Capacity
Projected Rate Adjustments Needed from 2007 through 2011
8
2005 Bremerton Water System Plan
Introduction
The City of Bremerton has a remarkable resource: a clean, abundant water
supply. Surface water from the Union River and groundwater from production
wells provide the source for Bremerton's water. The City supplies
approximately 3 billion gallons of water each year from these sources to over
56,000 people, representing over a third of all drinking water supplied in
Kitsap County.
Bremerton's water system is a Group A System operated as a municipally-
owned water utility under the direction of the City of Bremerton Department of
Public Works and. Utilities. Bremerton Municipal Code regulates City Utility
operations to provide safe and reliable water service. The water service area
consists of the Bremerton City limits and portions of the surrounding
unincorporated area in Kitsap County. Approximately half of the water is used
within the city limits, a third is provided to the Puget Sound Naval Shipyard,
and the remainder is used in the unincorporated
areas. All customers are represented by the
Bremerton City Council, the Bremerton Water
Utility's governing body.
Purpose of the Update
The 2005 City of Bremerton Water System Plan
(WSP) Update was prepared in response to
Washington State Department of Health (DOH)
regulations, which require all water purveyors
to update their water system plans every 6
years. Changes since the last plan that affect
Bremerton's water system planning include:
. Projected population growth increase in Bremerton's water service area,
with a resulting projected increase in potable water demand,
. The update ofthe Kitsap County Coordinated Water System Plan, in which
Bremerton's water system figures as a key element,
. Passage of theW ashiIlgton State Municipal Water Law requiring water
systems to implement more specific water efficiency measures and requires
more coordiIlationofwaterplanning between state and local agencies,
. Assumption of the Tracyton Water System by Bremerton in 2004, and
. Implementation of Watershed Planning for the Kitsap Peninsula in 2000
and plan veto in 2005 which halted the process.
Executive Summary
2005 Bremerton Water System Plan
The Water System Plan Update describes
. The existing water system,
. Future demands on the system forecasted over a 20-year planning horizon,
. A conservation plan designed to lessen these predicted demands, and
. A number of potential capital improvement projects to address supply,
distribution, and storage needs in Bremerton's water service area.
In accordance with the Growth Management Act, this plan is designed to be
consistent with other City of Bremerton, Kitsap County, and regional plans for
land use and municipal facilities. It will be used by City planners in their
review of proposed land use actions to ensure that these actions are compatible
with the long-range plans for Bremerton's water system.
Forecasting the Growth of Water Demand
The key to developing a water system planis the ability to project the demands
that will be made on the system in future years. In Bremerton, planning for the
water system's future must take place on both a local and regional level.
City of Bremerton
Water Demand Forecast
Population growth and the
resulting water demand
were projected for the
entire Bremerton water
service area on the basis of
Comprehensive Plans for
City of Bremerton and
Kitsap County. The
projections indicate that
total average day demand
for water will increase
from the current level of
about 7.7 million gallons
per day (MGD) to about
11.3 MGD in the year
2024, an increase of 45
percent.
25
I
I
___-.~ I
20
--~
__________ Maximum Day Demand
~..---
..y-~~
,.,
..
o
~ 15
<II
C
.2
..
Cl
C 10
~
~
Oro ht
Average Day Demand
1999 2001 2003 2005 2007 2009 2011 2013 2015 2017 2019 2021 2023
The City's capital improvement planning identifies needed improvements to its
distribution and storage systems by comparing the current capacity of those
systems with the capacity required if the population of the service area
increased as predicted.
ii
Executive Summary
2005 Bremerton Water System Plan
Meeting Future Needs: Planning for Conservation and Water
Supply Strategies
Water conservation is an important means of deferring
the need to develop additional sources of water supply.
Conservation can serve as an additional increment of
supply by enabling the existing transmission and
distribution systems to serve more customers while
maintaining the same capacity. The ability to postpone
the construction of capital facilities makes conservation
an option that is both cost-effective and environmentally
sound. The conservation plan combines proven
measures used by the Bremerton Water Utility in past
years with public education and involvement activities
promoting the advantages of water conservation by
means of school programs, special events, and the
distribution of home conservation kits, printed information, and mass media.
Overall, the recommended conservation measures are projected to result in
water savings of 5.2% by 2024.
Potential regional water supply opportunities to meet predicted growth m
demand include:
. Maximizing conservation opportunities,
. Expanding groundwater resources,
. U sing reclaimed water from the City's wastewater treatment plant, and
. Aquifer storage and recovery.
Recommended Capital Improvements and Financing Plan
The Water System Plan contains the City's capital
improvement program (CIP), developed to guide the
growth of Bremerton's water system through the year
2025. Included in the CIP are:
. Improvements to distribution system plpmg and
storage,
. Construction of an ultraviolet treatment facility to
meet new federal regulations,
. Upgrades to groundwater supply systems, and
. Continuation of seismic and security upgrades to
supply.facilities and reservoirs.
The total cost of capital improvements proposed from 2006 through 2025 is
$48 million. Funding will come from a variety of sources, including developer
Executive Summary
III
2005 Bremerton Water System Plan
extensions, capital facility charges for new hookups, state and federal loan
programs, rates, and bond sales.
The capital improvement program developed in this plan is highly dependent
on the rate, location, and nature of future development within the Bremerton
Service Area. If development proceeds in a manner significantly different
from the assumptions and projections used for this plan, revisions to the CIP
may be necessary.
Looking Toward the Future
The main challenges in the future of the Bremerton water system as described
in this plan are:
. Providing appropriate water supply and infrastructure to meet the
anticipated growth in the water service area,
. Maintaining compliance with current and future water quality regulations
as required by the Safe Drinking Water Act,
. Communicating effectively with water customers about the value of their
water system to increase customer understanding, confidence, and support.
For More Information
. Visit the City of Bremerton web site at
www.ci.bremerton.wa.us
. Call the Utility Customer Response line at (360) 473-5920.
. Contact your City Council Representative. City Council
meets Wednesdays at 5:30 p.m. and meetings are televised
on Bremerton-Kitsap Access Television Channels.
Executive Summary iv
Acronyms and Abbreviations
2005 Bremerton Water System Plan
Acronyms and Abbreviations
ADD
AFY
AMCL
ASR
AWWA
BAT
BMC
BWSA
CCF
CCL
CCP
CCR
CCS
CCWF
CENCOM
CFP
CFR
cfs
Cfu/mL
CIP
City
CMP
Council
County
CPR
CT
Cu ft
CWS
CWSP
DBP
D/DBPR
DCD
DNR
DOH
DSC
DWSRF
Ecology
EPA
EPA GPTRAC
Average daily demand
Acre-feet per year
Alternative maximum contaminant level
Aquifer storage and recovery
American Water Works Association
Backflow assembly tester
Bremerton Municipal Code
Bremerton water service area
Corrosion Control Facility
Contaminant Candidate List
Cross connection control program
Consumer Confidence Report
Cross Connection Control Specialist
Centennial Clean Water Fund
Central Communications emergency dispatch in KitsapCounty
Capital Facilities Plan
Code of Federal Regulations
Cubic feet per second
Coliform forming units per milliliter
Capital Improvement Program
City of Bremerton
Coliform monitoring plan
City of Bremerton, Washington City Council
Kitsap County .
Cardio pulmonary resuscitation
Disinfectant concentration multiplied by time
Cubic Feet (sometimes also written as ft3)
Community water system
Kitsap County Coordinated Water System Plan
Disinfection by-product
Disinfectant/Disinfection By-Product Rule
Department of Community Development
Department of Natural Resources
Washington State Department of Health
Debt service coverage
Drinking Water State Revolving Fund
Washington State Department of Ecology
United States Environmental Protection Agency
Environmental Protection Agency - Groundwater Pollutant
Acronyms and Abbreviations
ESA
ERP
ERU
ET
FEMA
FF
fps
gal
GED
GIS
GMA
gpd
gpm
GPTRAC
GUI
GWMP
GWR
HAA5
HCP
HPA
HPC
hrs
IDSE
IESWTR
IFC
IFR
laC
ISO
JHA
kW
LCR
LOS
LRAA
LT2 ESWTR
MCL
MCLG
MDD
MG
MGD
mg/L
Mgal
MGY
MID
2005 Bremerton Water System Plan
Tracing Model
Endangered Species Act
Emergency response plan
Equivalent residential unit
Evapotranspiration
Federal Emergency Management Agency
Required fire flow rate
Feet per second
Gallons
General Education Degree
Geographic information system
Growth Management Act
Gallons per day
Gallons per minute
General particle tracking hydrogeological model module
Groundwater under the influence of surface water
Groundwater Management Plan
Groundwater Rule
Haloacetic Acid (Sum of 5)
Habitat Conservation Plan
Hydraulic Project Approval
Heterotrophic plate count
Hours
Initial distribution system evaluation
Interim Enhanced Surface Water Treatment Rule
International Fire Code
Instream flow requirements
Inorganic contaminants
Insurance Services Office
Jurisdiction having authority
Kilowatt
Lead and Copper Rule
level of service
Locational running annual average
Long Term 2 Enhanced Surface Water Treatment Rule
Maximum contaminant level goal
Maximum contaminant level goal
Maximum day demand
Million gallons
Million Gallons per Day
Milligrams per liter (equivalent to parts per million)
Million gallons
Million gallons per year
Maximum instantaneous demand
Acronyms and Abbreviations
ml
MMM
MMS
MOU
MRDL
MREM/year
MSDS
MTTP
MtBE
MTU
MWL
N
N/A
NaOH
NMFS
NOM
NTNC
NTU
O&M
OFM
OSHA
OWQP
PHD
pCi/L
PLC
PM
PNR
PNWS-AWWA
POE
PHD
PRSC
PRV
PSE
pSI
PSM
PSNS&IMF
PVC
PWS
PWTF
Qa
Qi
QL
Qs
2005 Bremerton Water System Plan
Milliliters
Multimedia mitigation
Maintenance management software
Memorandum of understanding
Maximum Residual Disinfectant Level
Millirem per year
Material safety data sheet
Maximum total trihalomethane potential
Methyl-t-butyl ether
master telemetry unit
Municipal Water Law
Nitrogen
Not Applicable
Sodium Hydroxide (Caustic Soda)
National Marine Fisheries Service
Natural organic matter
Non-transient non-community
Nephelometric Turbidity Unit
Operation and maintenance
Washington State Office of Financial Management
Occupational Safety and Health Administration
Optimal water quality parameters
Peak hourly demand
Picocurries per liter
Programmable logic controller
Preventative maintenance
Public Notification Rule
Pacific Northwest Section American Water Works Association
Point of entry
Peak hourly demand
Puget Sound Regional Council
Pressure Reducing/Regulating Valve
Puget Sound Energy
Pounds per square inch
Process Safety Management
Puget Sound Naval Shipyard and Intermediate Maintenance
Facility
Polyvinyl chloride
Public water system
Public Works Trust Fund
Annual quantity
Instantaneous quantity
Largest capacity source available
Source production rate
Acronyms and Abbreviations
RAA
RAM- WTM
RMP
RTUs
SARA
SCADA
SDWA
SKIA
SMP
SOC
SSS
SU
SWTR
TCR
THMs
tM
TOC
TTHM
UGA
~g/L
UGMA
ULID
USC.
USEPA
USFWS
Utility
UV
VA
VOC
WAC
WaterPAK
WCP
WDFW
WFI
WHPA
WHPP
WQP
WRIA
WSDOT/APWA
WSP
WUEP
WWTP
2005 Bremerton Water System Plan
Running annual average
Risk Assessment Methodology for Water Utilities
Clean Air Act Risk Management Plan
Remote telemetry units
Superfund Amendments and Reauthorization Act
Supervisory control and data acquisition
Safe Drinking Water Act
South Kitsap Industrial Area
Standard monitoring plan
Synthetic organic carbon
System specific study
Standard units
Surface Water Treatment Rule
Total Coliform Rule
Trihalomethanes
Duration
Total Organic Carbon
Total trihalomethanes(suIh of 4)
Urban growth area
Micrograms per liter (equivalent to parts per billion)
Urban growth management agreements
Utility local improvement district
University of Southern California
United States Environmental Protection Agency
United States Fish and Wildlife Service
City of Bremerton Water Utility
Ultraviolet
Vulnerability assessment
Volatile organic chemical
Washington Administrative Code
Water Purveyors Association of Kitsap County
Watershed control program
Washington Department of Fish and Wildlife
Water Facilities Inventory
Wellhead protection area
Wellhead protection program
Water quality parameter
Water Resource Inventory Area
Washington State Department of Transportation/American Public
Works Association
Water system plan
Water use efficiency plan
Wastewater treatment plant
Acronyms and Abbreviations
2005 City of Bremerton Water System Plan
Section 1
Introduction and Water System Description
1.1 Introduction
The City of Bremerton has a remarkable resource: a clean, abundant water supply. The
Bremerton Water Utility supplies approximately 3 billion gallons of water each year to over
56,000 people. This represents over a third of all the drinking water supplied in Kitsap County.
Bremerton's Group A water system is a municipally-owned water utility under the direction of the
City ofBremerton Department of Public Works and Utilities. Bremerton Municipal Code (BMC)
Title 15 regulates City Utility operations to provide safe, reliable service to the residents of the
City of Bremerton and to those non-residents within the service area. These utility operations
include water, wastewater, and stormwater. The Water Utility is managed as an enterprise fund in
the City's budget. The water service area consists of the Bremerton city limits and portions of the
surrounding unincorporated area in Kitsap County. Approximately 80 percent of the water is
used within the city limits (includmg "Navy systems), and 20 percent is used in the unincorporated
areas. All customers are represented by the Bremerton City Council, Bremerton Water Utility's
governing body.
The Bremerton Water Utility owns and operates two water systems. Additionally, the Bremerton
Water Utility has contractual requirements to provide water supply, operations, and maintenance
for the Rocky Point Water District, supply all the water to the Puget Sound Naval Shipyard and
Jackson Park Naval Housing water systems, and sell water to the City of Port Orchard as outlined
in Table 1-1 below.
of Bremerton
Approximate
Population Served
2005
WATER'.SYSTEMS'O:WNED~~I~~]).~.OgERATED;B::Yr'BREM.ERTON~~WA:tERRtimiTY.
Bremerton Main S stem Class A Communi WA08200R 49,521
Class A Non-transient
Non-communi
.' ,..":<;;t~~:~r;.~I;~~\~!~~~~~r,m~jll~~~~~II~~t1~:~;i1~l
Bremerton West 517 Zone
Sy!o1em Name
System Type
WFI#
Roc Point Water District Class A Communi W A02052E 1,740
....:...:....m;\;WWj}EWS~STEM.SJR'UR6msI~tQ;W~f.iRrQNJJ!f;~FRijwt::jREMER;T~QNSWAi\ER(;il'ijflliITtt:...~".::....~..,~:l
Puget Sound Naval Shipyard and
Intermediate Maintenance Facili
Jackson Park Naval Housin
Ci of Port Orchard
Class A Comniunity
W A03468C
2,903
W A03468C
W A68900
2,540
NA
The West 517 Zone system was determined to be a separate water system by the Department of
Health in 2001. This WSP includes required planning information for both systems owned and
Water System Description
1-1
2005 City of Bremerton Water System Plan
operated by the City of Bremerton. Since the W517 Zone is a small non-transient, non-
community system, it is only required to prepare a small water system plan; however, since it is
operated in conjunction with Bremerton's main system, its planning information will be included
in this Water System Plan. Copies of the Water Facility Inventory form for both systems are
included in the Appendices. Other water systems purchasing water from the City of Bremerton
are responsible for their own water system planning (see Table 1-4).
1.2 Water System Planning Objectives
The purpose ofa Water System Plan is to provide a uniform process for purveyors to:
· IdentifY present and future needs,
. Set forth the means for addressing those needs, and
· Demonstrate the system has the operational, technical, managerial, and financial capability to
maintain compliance with all relevant local, state, and federal plans and regulations.
Bremerton is required to develop a WSP according to Chapter 246-290-100 Washington
Administrative Code (WAC) and by BMC Section 15.02.020. This WSP is to be approved by the
Mayor, adopted by the City Council, and administered by the Director of Public Works and
Utilities. All anticipated water system projects should be identified in the Capital Improvement
Program portion of the WSP. Information contained in the WSP should be referenced when
proposing new facilities or modifications to new facilities.
Figure 1-1 City of Bremerton location
~'.."c,<,"",,,, 1....,-,0
[J.;:..~ ((-'or,:":
C;O~.:-""
II
Water System Description
1-2
2005 City of Bremerton Water System Plan
1.3 Water System Plan Background
Previous WSPs were completed in 1975, 1982, 1992, and 1999. The last plan was approved by
the Washington Department of Health (DOH) in December 2000. This 2005 WSP update was
prepared in accordance with DOH regulations (WAC 246-290), the DOH "Water System
Planning Handbook", and the 2003 Municipal Water Supply Efficiency Requirements Act, and
was also coordinated with the City of Bremerton Comprehensive Plan, the Kitsap County
Comprehensive Plan, and the Kitsap County Coordinated Water System Plan.
The following changes have occurred since the 1999 WSP was completed:
· The Risk Management Plan for Chlorine in compliance with 40 CFR 68 Clean Air Act required
that the Environmental Protection Agency (EP A) implement a program to manage and
prevent accidental releases of hazardous substances. Bremerton completed the requirements
for this regulation in 1999 and is in compliance with all updates.
· Implementation of the 1998 Washington State Watershed Management Act began in the
Kitsap Peninsula in 2000 but this water planning process was halted in 2005 due to a veto
from the Squaxin Island Tribe.
· The Bremerton West 51 T Zone was designated as a separate water system in 2001.
· The United States Congress passed the Public Health Security and Bioterrorism Preparedness
and Response Act of 2002. A Vulnerability Assessment and Emergency Response Plan were
developed for the Bremerton water system in compliance with this act.
· Passage of the Washington State Municipal Water Law in 2003 requires water systems to
implement more specific water efficiency measures and requires more coordination of water
planning between state and local agencies.
· The Tracyton Water System was assumed by the City ofBremerton in 2004.
· The Kitsap County Coordinated Water System Plan was updated in 2004.
· An agreement with the City of Port Orchard in 2005 specifies wholesale water sales from
Bremerton and coordination of the West 580 Pressure Zone development.
The following Sections comprise this WSP:
Section 1 Introduction and Water System Description
Section 2 Planning Background Information
Section 3 Sources of Supply
Section 4 Water Quality and Regulatory Compliance
Section 5 Transmission and Distribution System
Section 6 Operations Program
Section 7 Performance and Design Criteria
Section 8 System Analysis
Section 9 Capital Improvement Plan
Section 10 Financlal Plan
Water System Description
1-3
2005 City of Bremerton Water System Plan
The following documents are also part of this WSP by reference. The date in parentheses
indicates the year the document was last revised:
Wellhead Protection Plan (1996)
Water Reuse Feasibility Study (1998/2005)
Water Rights Analysis (2006)
Watershed Control Plan (2006)
Vulnerability Assessment as required by the Bioterrorism Act (2003)
Emergency Response Plan as required by the Bioterrorism Act (2004)
Risk Management Plan for Chlorine (2004)
Service area boundary map and resolution of service area agreements (2005)
Interim Water Use Efficiency Plan (2005)
Rate Study (2004)
Water Shortage Contingency Plan (2002)
Coliform Monitoring Plan (updated annually)
Organicslinorganics Monitoring Plan (updated annually)
On November 2, 2005, the BremertonCity Council authorized the Mayor to execute the contract
for HDR Engineering to assist the City with this WSP Update.
1.4 Bremerton Water System History
When the town of Bremerton was incorporated in 1901, with a population of 1,000, drinking
water came from local wells and streams. The City of Bremerton has had a public water supply
system since 1902, when a private water company, The Pacific Coast Pipe Company, diverted
water from Charleston Creek. The Anderson and Gorst Creek sources were developed in 1909
and 1911, respectively. The City of Bremerton purchased the 2 million gallons per day (MGD)
water system in 1917 for $225,000.
Growth of the Puget Sound Naval Shipyard and the City after World War I required significant
improvements to the water system. In 1919, storage for 10 million gallons (MG) was added with
the construction of Reservoir 4. The Union River was considered as a future water supply
source. In the 1930's, 2,800 acres of the Gorst Creek watershed and 2,200 acres of the Union
River watershed were purchased by the City. Development of the Anderson Creek wellfield
began in 1940 to meet increased demands of World War II shipyard activity. Reservoir 4's
capacity was increased to 11 MG in 1945. Casad Dam on the Union River was completed in
1956. Use of Charleston, Gorst, and Anderson Creeks as potable water supplies was
discontinued in 1963, 1979, and 1984, respectively. Gorst and Anderson Creeks are still
maintained as emergency water supplies. Since the late 1970s, the City has been developing
ground water sources in East Bremerton and the Gorst Creek Basin, and in 2005 rehabilitation of
the Anderson Creek well field was completed.
In 1992, Bremerton received approval from DOH to continue to operate the Union River surface
water supply as an unfiltered source. Bremerton is one of only a few systems nationwide that can
meet the strict water quality requirements (which are described in Section 4) and is approved to
operate an unfiltered surface supply. In 2001, DOH designated the West 517 Zone as a separate
Water System Description
1-4
2005 City of Bremerton Water System Plan
water system. In 2004 the Tracyton Water District service area was assumed by the Bremerton
Water Utility.
1.5 Overview of Existing System
The City of Bremerton draws water from a large surface water reservoir on the Union River and
thirteen wells. Water is distributed to customers via approximately 300 miles of water pipe
varying in size up to 36 inches in diameter. Pump stations move water from pressure zone to
pressure zone and distribution system reservoirs provide storage. Booster stations and pressure
regulating stations control service pressures within the system. Facility locations are shown in the
Schematic (Figures I-2a-b) and Water System Map (Figures I-3a-c). A summary of the
Bremerton water system is provided in Table 1-2. Detailed descriptions and inventories are
provided in the following sections.
remerton a er system ummary"
""""",<';.< " ,_-,7~;''',,>,,,<,,'l-'' .~,,- ,\_:..."" r"', .'~~~''> -,- .~,", ',.,.. ". ",," ,..- -, - '\ ,'J' .... .... .......:.. .., .....>..;...,...... .:..... ':': ";i':':' ..
'.' .' '. ..
:~.y"yA:TER/SySTEM ... ..... . . . .
Sources Union River and 10 wells, intertie with W517 Zone
6- Year Average Day Demand 7.7 million gallons per day
6- Year average Equivalent Residential Unit Use 183 gallons per day per single family residence
Number of Connections 16,361
Population Served 49,521
Miles of Pipe 291 miles
Number of Reservoirs 3 raw water, 16 treated water
Number of Pump Stations 10
Number of Pressure Booster Stations 5
Number of Pressure Reducing Stations 14
Number of Pressure Relief Valves 7 (includes 2 surge anticipators)
Service Area 12,100 acres (not including the watershed)
Pressure Zones W256, W440, W580, W650,E240,E398,E490
":~~~.:~j;;t;~~Q~~S)'~~M",,' . . ., .' . . ..~'.'~r;.<..::';<'\'~ ; 'oZ,::' .....,..:'...(.:... ....~.' ..,
Sources 3 wells and intertie with the main Bremerton system
6-Year Average Day Demand (summer) 0.5 million gallons per day
Equivalent Residential Unit Use This system is a non-transient, non:-eomnmnity system
Number of Connections 63
Population Served (employees) 400
Miles of Pipe 11
Number of Reservoirs 2
Number of Pump Stations 1
Number of Pressure Booster Stations . 1 .
Number of Pressure Reducing Stations . . 2.
Number of Pressure Relief Valves 2
Service Area 3,786 acres
Pressure Zone W517
Table 1-2
B Wt s s
" As December 2005
Water System Description
1-5
2005 City of Bremerton Water System Plan
1.5.1 Sources of Supply
Surface Water
Approximately 60 percent of the water supply for the City of Bremerton is provided by
the Union River system. The main source is the Union River Reservoir, located behind
Casad Dam, a concrete arch structure that rises 130 feet above the river and provides
approximately 1.4 billion gallons of water storage. Water flows from the reservoir down
the natural streambed to the McKenna Falls Intake Facility. Three branches of the Union
River meet near the Intake Facility. Water from the Union River and West Branch (used
seasonally) is blended at the McKenna Falls Intake Facility, where it is screened and
cWorinated. Water then enters the transmission main and flows to the distribution
entrance point at Reservoir 4, where it is treated with sodium hydroxide for corrosion
control. Flow is controlled by a valve at Casad Dam, a flow control valve on the
transmission main near the Twin Lakes Reservoir, and by the level in Reservoir 4. Since
1992, the East Branch of the Union River no longer enters the intake but continues
downstream to meet downstream flow requirements.
Bremerton owns and controls 98 percent of the 2,964-acre Union River watershed that
supplies the McKenna Falls Intake Facility. This allows the City to effectively control the
activities in the watershed and protect source water quality. The estimated firm yield for
the Union River System is 2,020 million gallons per year (MGY).
The City of Bremerton actively protects its watersheds through the provisions 'in the
Watershed Control Plan and the Bremerton Land Management Plan, which include
security and monitoring provisions. The accessible areas of the watersheds are fenced,
gated, and signed to limit access only to authorized personnel. The area is regularly
patrolled to ensure trespassing is kept to a minimum. Regular water quality monitoring of
the surface sources verifies the effectiveness of the watershed protection program for the
City. The City operates the surface system under the non-filtration requirements of the
Surface Water Treatment Rule (SWTR). To continue to operate the Union River source
as an unfiltered supply, Bremerton is required to conduct an annual sanitary survey by
DOH and submit an annual watershed monitoring report to DOH documenting
compliance with the unfiltered source criteria of the SWTR.
Water quality of the surface sources is excellent. Turbidity is continuously monitored and
is generally below 1 Nephelometric Turbidity Unit (NTU). Higher turbidity levels do
occur during heavy rains; however, these events are usually of short duration. When
turbidity approaches higher than desirable values, the water to the intake is shut down, and
the water either bypasses the intake or is stored in the Union Reservoir until sufficient
settling occurs. High turbidity water from the West Branch is not allowed to enter the
system and passes downstream. Raw water coliform testing confirms that fecal coliform
concentrations are less than 20 colonies/100 mL in 90 percent of the samples collected
over any 6-month period. With the redundant cWorination facilities, automatic system
shutdown capabiiities, and bypassing of turbid water, water quality of the surface source
meets all Safe Drinking Water Act (SDWA) requirements.
Water System Description
1-6
2005 City of Bremerton Water System Plan
To comply with the SWTR, cWorine contact time (CT) values are calculated according to
WAC 246-290-636. Chlorine residual is monitored continuously at the Twin Lakes valve,
Pump Station 3, Gorst Monitoring Station, and Reservoir 4. For process control, a
minimum cWorine residual of approximately 1.4 milligrams per liter (mg/L) is maintained
at the entrance to the transmission system at the McKenna Falls Facility, and a minimum
cWorine residual of approximately 1.0 mg/L is maintained at the entrance to the
distribution system at the Reservoir 4 inlet. The State requirement is a minimum of 0.2
mg/L at the entrance to the distribution system with detectable cWorine residual
throughout the distribution system. CWorine grab samples are taken at points in the
distribution system at the same times and locations as coliform samples.
Prior to entering Reservoir 4, the pH of the water is increased with sodium hydroxide at
the Corrosion Control Facility (CCF) in accordance with 40 CFR Part 141.83. The target
pH value is 7.7 standard units (SU). The CCF began operating in March 1999.
Distribution system pH and customer tap lead and copper monitoring verifies the
effectiveness of the corrosion control treatment.
Groundwater
The City of Bremerton's main system currently has ten active production wells supplying
approximately 40 percent of the water to the system. The West 517 Zone system has
three wells serving that system. The City completed two other wells (Wells 21 and 22)
not yet been put into production pending water rights approvals and two replacement
wells at Anderson Creek. The wells (described in detail in Table 3-1) are generally located
in three groups: East Bremerton wells, Anderson Creek watershed wells, and Gorst Creek
watershed wells. The locations of the wells within the system are shown on the Water
System Map and Schematic (Figures 1-2 and 1-3). Most wells pump directly into the
system during operation and are controlled through the Supervisory Control and Data
Acquisition (SCADA) system by the level in the reservoir(s) they supply. Anderson Creek
wells pump into a common sump, and discharge into the system is controlled by system
operators. Water quality in the wells is excellent. Each well, with the exception of Well
19, is equipped with cWorination facilities for disinfection.
The eight aquifers the City draws drinking water from are:
· Anderson Creek Shallow Artesian Aquifer
· Anderson Creek Deep Artesian Aquifer
. Twin Lakes Aquifer
· Gorst Sea Level Aquifer
. Gorst Valley Aquifer
. Manette Sea Level Aquifer
Wells lR, 2R, and 3
Wells 6R, 7, and 8
Wells 15,17,18, 19, and 20
. Well 16 (irrigationonly)
Well 22 (water rights application)
Wells 13 and 14
e .Meadowdale Aquifer
'1.1..11 21 ('Hot",r ":~"'4-" ~~~I~~~4-;~_\
y" vU . '- vva <;a BoUt;) app J",aUVH}
. Parkwood East Aquifer
Well 9
Water System Description
1-7
2005 City of Bremerton Water System Plan
Aquifer characteristics are more thoroughly discussed in Bremerton's Wellhead Protection
Plan (1996) which was previously submitted to DOH.
Water Rights
Water rights are discussed in Section 3, Sources of Supply.
1.5.2 Hydraulic Gradients and Pressure Zones
The City of Bremerton operates eight major hydraulic gradients or pressure zones within
the distribution and transmission network. Seven pressure zones are in the main system:
four zones in West Bremerton (W256, W440, W580 and W650) and three in East
Bremerton (E240, E398, and E490). One pressure zone is in the West 517 Zone system.
The number designation refers to the overflow elevation of the controlling reservoir(s).
These pressure zones are illustrated in the Water System Map (Figure 1-3). Hydraulic
gradients within the zones are generally controlled by the water levels in the system
reservoirs. Service pressures within the zones are maintained at acceptable levels under
normal, peak, and emergency operating conditions.
Pressure regulating valves are described in Section 5 and include installations for reducing
pressure and pressure relief Pressure reducing stations allow water to flow from higher
pressure zones to lower pressure zones as needed. Pressure relief valves prevent over-
pressurization by relieving excess pressure to atmosphere or to a lower pressure zone.
1.5.3 Storage Facilities
The City of Bremerton currently operates 19 reservoirs (16 distribution and 3 raw water)
in the Main System and two reservoirs in the West 517 Zone System. These reservoirs
range in storage volume from the Union River Reservoir behind Casad Dam to Reservoir
6, a 0.15 million gallon (MG) elevated steel tank. The reservoirs are described in detail in
Section 5 and provide peak demand storage, emergency and fire flow reserve, and
hydraulic gradient control for the system. A total of 32 MG of storage capacity presently
exists within the Main System and l.2MG in the West 517 Zone System.
When it is full, the Union River Reservoir provides 1,400 MG of water in storage for the
system. Excess water from the Union River canbe diverted to the Twin Lakes Reservoir;
however, the Twin Lakes reservoir does not directly provide storage to the system. The
Twin Lakes Reservoir sits on a hydrogeologic divide and has no natural outlet. Its water
seeps into the ground to provide groundwater recharge to both the Gorst Creek
Watershed wells and to the Union River drainage.
1.5.4 Pump Stations.
Bremerton operates pump stations ranging in size from 60 gpm to 4,000 gpm.
Descriptions of the existing pump stations are listed in Section 5. The pump stations
move water from lower pressure zones to water storage reservoirs in higher elevation
pressure zones. Booster stations increase the pressure in a limited area to adequate
Water System Description
1-8
2005 City of Bremerton Water System Plan
pressures. These stations are required to ensure an adequate supply of water at acceptable
pressures to all customers in the system.
1.5.5 Transmission and Distribution Piping
Bremerton has an extensive network of transmission and distribution piping ranging in size
up to 36 inches in diameter. The pipe inventory lists approximately 300 miles of pipe with
the majority being 6-inch or 8-inch diameter distribution piping. A listing of the quantity
of pipe by diameter is provided in Section 5.
Transmission main piping is used to move large quantities of water from one area of the
system to another, generally without service connections. It includes the piping bringing
water from the McKenna Falls Intake Facility and the three pipes crossing the Port
Washington Narrows to supply the east side of the system.
The distribution system serving the City of Bremerton is a grid of 4-inch to 16-inch mains
comprised of cast iron, ductile iron, polyvinyl chloride (PVC), steel, galvanized steel, and
asbestos cement materials. Ductile iron and cast iron pipe make up the majority of the
system. Flow within the system is generally from west to east. The system contains fire
hydrants and valves to provide Utility customers with fire protection.
1.5.6 Telemetry and Controls
The City ofBremerton utilizes a sophisticated SCADA system to monitor and control the
water supply and distribution system. A central computer and two master telemetry units
(MTUs) are located at the Public Works and Utilities office. Additional information on
the SCADA system is provided in Section 6.
1.6 Existing/Future Service Area
Figure 1-4 shows the City ofBremerton Water Utility service area. The City ofBremerton Water
Utility's main system serves over 56,000 residents in Bremerton and portions of Kit sap County,
including the Gorst area to the south and the western portion of the Manette Peninsula in central
Kitsap County from the city limits to Bucklin Hill Road. The West 517 Zone service area
includes the Gold Mountain Golf Course, Aero Mobile Estates (master metered), Bremerton
National Airport, and the Port of Bremerton Industrial Park. The City also provides water and
operations and maintenance to the Rocky Point Water District and contracts to supply water to
the Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF) and the
City of Port Orchard. (Refer to Tables 1-3 through 1-5 for details on water service agreements.)
The current service area includes approximately 5,300 acres within the Bremerton city liinits, not
including PSNS&IMF. Bremerton serves approximately 6,800 acres within Kitsap County,
including the Rocky Point Water District. As shown on Figure 1-4, the City ofBremerton Water
Utility service area is essentially contiguous with the surrounding water purveyors as follows:
· North - Silverdale Water District and Erland Point Water Company
· South - The City of Port Orchard and the Sunnyslope Water District
Water System Description
1-9
2005 City of Bremerton Water System Plan
· East - North Perry Avenue Water District
· West - Unclaimed service area
1.6.1 Service Area Agreements
The Utility has written service area agreements on the boundaries between their respective
service areas with:
· Erland Point Water Company
· North Perry Avenue Water District
· Rocky Point Water District
· Silverdale Water District
· Sunnyslope Water District
Currently, Bremerton is in the process of developing a written service area agreement with
the City of Port Orchard. Tables 1-3, 1-4, and 1-5 summarize the agreements between the
City ofBremerton Water Utility and other water systems.
Growth in the service area is expected to occur in the area north of the city limits in the
Manette Peninsula, south of the city limits near the Bremerton Airport, south of Werner
Road, and west of Kit sap Lake. Population projections and land use are described in more
detail in Section 2.
The City currently pursues annexation of areas on the edges of the city limits. The
Outside Utilities Agreement must be executed prior to receiving water service outside city
limits in accordance with the Bremerton Service Area policy that requires property owners
outside the City boundaries to support annexation to the City ofBremerton as a condition
for receiving City utilities (see Section 1.7.3).
Water System Description
1-10
2005 City of Bremerton Water System Plan
Document Date
TRACY tON WATER DISTRiCT.
2004
Outlines the assumption of the Water District by the
City of Bremerton Water Utility.
lnterlocal
:]iilCKV,POfflTWATERDISTtUCT "
Service Area
Agreement
and
Agreement to
S I W boundary. See Table 1-4.
u ater
ljEPAR'tMENl'OF.'imfNAW ..
Provides water service quality and quantity
provisions for:
Puget Sound Naval Shipyard (3 meters),
Jackson Park Complex/Navy Hospital (2 meters),
East Park Naval Housing - currently inactive (I
meter),
Navy Building at Bremerton National Airport (1
meter),
Camp McKean, Kitsap Lake Recreation Area (1
meter),
Navy-leased building on Wycoff Avenue (1 meter),
and
Pass and ID Buildin
:il~ml0F/P'OR'F0RC~iW~i.o:'.S.,.i.,.:.
lntertie Maintains water system intertie at Anderson Hill
Water 1996 Road for supplying domestic supply on a surplus
Purchase basis.
Intertie 2005 Estab~shes.respective service area boundaries and
A eement use of mtenes.
7SJ:EWRb~t;&};WXTER;:6IStRiC!t...
1998
Provides interim water service, operations and
maintenance, pipe installation, meter reading and
billing, conveyance of pipeline, and service area
Updates agreement from
1960.
Water and
Sewer
Service
1997
Contract # N44255-96-M2292
Updmesagreementfrom
1989.
Current
Service Area
Agreement
1982
Current
Current
Establishes respective Service area boundaries.
Current
Water System Description
1-11
2005 City of Bremerton Water System Plan
Table 1-4
Rocky Point Water District Water System Contractual Responsibilities
Activities By City DOH In # 02052E
By Customer Other
'WATERSVSTE1\iPLAN \." :;:.... ,.
Population and Demand Projections .
Financial Planning .
Capital Improvement Planning .
Operation and Maintenance Program .
Emergency Response Program .
Water Conservation Program .
,OPEMrt()NS:i~niMA'l:NtENAN€E' . . i....;~....... ..';;.; ....;; >< ''-', ...' .' .';.
Routine Main Flushing .
Hvdrant Testing and Repair .
Cross-Connection Program .
Backflow Prevention Assembly Testing .
Disinfection of New Facilities .
Customer Complaint Response . .
Emergency Repairs .
!::WWfRtffi'0u~m";...... ...;... \ ....... . ..... . .c.,,,..:..... ....', .;,..'> -~~;'
. . ."C;
Source Treatment .
Source Water Quality Monitoring .
Distribution Monitoring: Coliform . RP pays
City
Lead/Copper .
Disinfection By-products . RP pays
City
Investigation of Water Quality Complaints .
Main Flushing Due to Water Quality Complaints .
Disinfection of Existing Facilities .
j(~~FJj~vOOjiOMENij}N:'E,P:J{ij-GID\:M. "\' ....;.... :'.'1 .;. . ,i. "-":;.?;:
;.' i.......,
Main Extensions .
Replacement of Distribution Lines .
Replacement of Transmission Lines .
Other New Facilities, Including: .
Storage Tanks .
Wells .
PumP Stations .
@lVrI:NLlSm1JJME";';.. ". > ..... .....;. .>;.";': .....: ;.;.....;.... ...... ..,:,,;(
Billing Individual Customers .
Payment of Utility Taxes .
Payment of Operating Permit .
Collection of Connection Fees .. . . II .. .. II .
Water System Description
1-12
2005 City of Bremerton Water System Plan
Table 1-5
U.S. Navy: Shipyard and Jackson Park Water S stem Contractual Responsibilities
Activities By City PSNS DOH ID# 03468C
By Customer Other
WA'FER: SYS'FEM'PLAN. .-'- . i . .. ..'. .. '.. JI ,
.'
Population and Demand Projections .
Financial Plannin~ .
Capital Improvement Planning .
Operation and Maintenance Program .
Emer~encv Response Program .
Water Conservation Program . . Regional
, OPE.ffi\rtONS~x:NDc'l\OO::NtENANCE ::. 'ii. ,,". ....':.. '" , . i' >..':...."'.::..,...~
. .':' '. . ;':::.:' .....
Routine Main Flushing .
Hydrant Testing and Repair .
Cross-Connection Program .
Backflow Prevention Assembly Testing .
Disinfection of New Facilities .
Customer Complaint Response .
Emergency Repairs . , .
,W*~E:RiQUAEF:tyr;i,;: / .,...;:'.":C:::':;'..}.\.;.:,;.;.....:., '.,! ;.' J, .... ,,'::.i;;. '.../'i:';.....".....r " .'::.....
:.'.,,0:.,.'. ...
Source Treatment .
Source Water Quality Monitoring . .
Distribution Monitorin~: Coliform .
Lead/Copper .
Disinfection By-products .
Investi.e.ation of Water Quality Complaints .
Main Flushing Due to Water Quality Complaints .
Disinfection of Existing Facilities .
.:€~f,t~~~k0ME1W::Njj~~I{()G~~;;rj'/,i; j;;t~:,:,t\;~;~!i~,:~; ~:~~;( }~i,$~~t~~:~~t, 7~~:!~~,;'ii~\; {: "; ~;::;',?:~.~i~'~,~:J{!iJ ;/F11h~t:~.)=~~~1:~:;n:r\~:~s: t~~ t:~):~~~:~'.;{f~\;-i_:;:.:;
" ,~. '::':Tii\,/;:,'i:2}:~
Main Extensions .
Replacement of Distribution Lines .
Replacement of Transinission Lines .
Other New Facilities, Including:
Storage Tanks .
Wells .
Pumps Station .
.:ADMINISfflMj;m~;:,,:',,: " :.'0,..... " .,':: .', , ..,.,,:::;.: (,!;\',i";/",:': \",,":>:,:"., '(';.;.'i, X :':;i: .7 '.'. J
. Billin~ Individual Customers . Customers on Navv Property Not Billed
Payment of Utility Taxes .
Payment of Operatin~ Permit .
Collection of Connection Fees: N/A N/A
Water System Description
1-13
2005 City of Bremerton Water System Plan
1.6.2 Service Area Characteristics
The service area is located within the Puget Sound Lowland. Geologic uplifting of the
Cascade and Olympic Mountain ranges formed the Puget Sound Lowland. Erosion of
these mountain ranges deposited sedimentary materials in the lowlands, and glaciation
carved the low rolling hills, scattered lakes, islands and inlets. The Vashon Drift,
composed of unconsolidated silts, sands and gravels, was deposited about 13,500 years
ago by an ice sheet known as the Vashon Glaciation that advanced from Canada. These
deposits are as much as 3,000 feet thick and normally are divided into three units. The
upper and lower units consist of glacial drift deposited by the ice or glacial meltwater and
are composed mostly of layers of sand and gravel alternating with layers of silt and clay.
The middle unit consists of a non-glacial deposit of silt and clay that normally ~eparates
the other two units. The thickness of the upper unit is normally 200 to 400 feet. The
middle unit ranges. up to 260 feet, but is commonly between 10 and 80 feet thick. The
thickness of the lower unit is estimated to be between 2,000 and 3,000 feet.
The topographic features and waterways are generally oriented on a north-south axis
corresponding to the orientation of the Cascade and Olympic Mountain ranges and the
direction of advance. and retreat of the Vashon Glaciation. Lands range from sea level to
over 600 feet in elevation and include forested regions to the west in the vicinity of the
Union River and Gorst Creek Watersheds. Bordering the marine shoreline are moderate
to steep, irregular cliffs carved first by glaciation and then by erosion. Steep slopes also
border the numerous small stream valleys that were the sites of glacial-melt water streams.
The average annual precipitation vanes, but is generally between 45 and 50 inches per
year in the City and about 60 inches per year in the Union River Watershed area.
1.7 Service Area Policies
Bremerton has a legislatively-mandated "duty to serve" within its water service area, as
designated in Figure 1-4. Section 3 describes how Bremerton determines adequate water capacity
to serve additional customers. The Bremerton Water Utility procedures for processing water
service requests are contained in the Kitsap County Coordinated Water System Plan (CWSP) and
the Bremerton Municipal Code.F ollowing is a summary of adopted policies/ordinances relating to
the Bremerton Water Utility service.
1.7.1 Kitsap County Resolution Adopting the Coordinated Water System
Plan
Resolution No. 090-2005, dated May 9,2005, adopts the latest update of the CWSP. The
first CWSP was completed by the Water Utility Coordinating Committee in 1992. The
resolution was adopted subject to a specific purpose, goals, and policies. The purpose of
the CWSP is to maximize the efficiency and effectiveness of water service in the County
by defining service areas within which utilities accept responsibility for providing service.
Goals and policies set forth pertain to coordinated planning, water supply and distribution,
planning and design standards, and appeals.
Water System Description
1-14
2005 City of Bremerton Water System Plan
1.7.2 Bremerton Municipal Code Regulating City Utility Operations
Bremerton Municipal Code (BMC) Title 15 regulates City Utility operations to provide
continued safe, reliable utility service to City of Bremeron residents and those non-
residents the City agrees to serve. These utility operations are water, wastewater, and
stormwater. General Utility provisions are listed under BMC Section 15.01, and Water
Utility provisions are located in BMC Chapter 15.02. In summary, Title 15 includes
general provisions such as operations, utility service agreements with customers of the
Utility, conditions of service, penalties for false information, developer system
improvements, system development and construction standards for modification or
improvement, and utility permit requirements. The authority of the Water Utility includes
adopting, establishing, and enforcing standards, rules, and regulations; developing and
implementing comprehensive planning; recommending rates and charges; and providing
utilities and contract services.
BMC Chapter 15.02 includes subsections concerning development of a water system
comprehensive plan, service availability, service beyond city limits, construction standards,
abandonment of private mains, private pressure adjustment, hydrants, irrigation and fire
service metering, service connections, connection size, meters, backflow and cross-
connection control, water system operation and maintenance, interruption of service for
emergencies, abatement of nonconforming unauthorized or unsafe conditions, cross-
connection control inspection, meter operation and maintenance, excessive consumption,
waste of water, prohibited acts, assessments, rates, fees and charges, billing, and appeals.
1.7.3 Outside Service Area Policy
The Outside Utilities Agreement is a recorded document which must be executed prior to
providing water service outside city limits and is an element of the Bremerton service area
policy. The BMC requires property owners outside the City boundaries not to oppose
annexation to the City of Bremerton as a condition for receiving City utilities. Potential
outside-of-city customers who do not wish to support annexation have the following
options:
. Drill their own well in compliance with County requirements,
. Be served by another public water system,
. Construct a new public water system operated by an approved satellite system,
management agency according to the rounty Coordinated Water System Plan policy
and state regulations, or
. Not proceed with a proposed water-dependent development.
1.8 References
History of the Bremerton Water System..John Short. 1962.
Water System Planning Handbook. Washington Department of Health. 1997.
Water System Description
1-15
of Bremerton Water S stem West Side Overview
IWEST 440 ZONE I
LEGEND
~ Raw Water
IIIii After Treatment
D Future or Off Line
!il Pump Station (PS)
IQ] 800ster Station (8S)
ill Well(W)
IWEST 650 ZONE I
McKenna Falls Intake
395 It
01
I W440 I W256
-
. Zone Intertle
To East 240 Zone
~
~
16531
160 It
I wen lR I
99 ft
To City of Port Orchard
figure1-2a
Water System Description
1-16
Citvof Bremerton Water System East Side Overview
From. West 255 Zone
l~
fPS1il
~
Figure 1-2b
I EAST 398 ZONE .1
Res 19
239 ft
I EAST 490 ZONE I
Res 16
239 ft
~
..
E398 I E240
Zone I"tertla
EJ
01
EAST 240 ZONE I
LEGEND
I!!I Raw Water
l1li After Treatment
o Future or Off Line
~ Pump Station (PS)
~ Booster Station (BS)
m Well (W)
-
1m Well 9
00 200 fl
~ Well21
152ft
Future
.
I
,~
[PS11l
~
Water System Description
1-17
l~' lU
-r--~~' '
Ui ,- .... ;
I-L
/"
{
I
LJ
I
I
14
+1
r
9
-
,.,.
~\
~y
",>,".,.
- .......-~
y~
r )
I I
1--4- h
~._ -il. J 1~\i1::{ic;S;~;
-~) ,'~
.",' (, ",
h_~
~. c'
Ai ---: )~F~},
/ :' ' ,""""~'-
,/ ,\ ',:;/~";,. I /.::;~'S/,;.{
I ,," \ ",' c' ">.~,""
,',:' \, .::.;:};,~~:?; ',~ :.~:
- 9 t~"\
-1 tJ i, i "\
I J " i _ , I \. I,' ! 1
I I i (" " I N..}.,
r-"-r-".'--:i \_._~~ ~, '
j I .! I 1 r--r-r, '
~..J f C
~
--- Y"-'~"
-DQP' '" -'~-", --~
."" . - ,
;, ' ",_. I" !
' -, ,- ~t....._--
: - - - . --
. - - -. -
' ,
' . :....' - . "i.: \
\
., -
ir--
[
I r1 \
Pt2
i
j
I
:t.
....
"
~
1
I
r
. ~ L_---'
J-
~"'l1
,
f--- I
-
-
,__h L I , / !
Yn~ if I)
,
, ~
'," ",i
II
"':""~ ."";c_ >
. , "I \'
I I j I I I ",,'
I , 'L_L._~.".~
, 1--.-... ~ I ;
,.----.-.,...--y-i.~ i I- \ J' ,
I '''''' !,_ ~_
i ~ I iftl/ltiift, ,
Ii! ~ i? , , ) ! I I :"~_'''''-'
i ! _LLLL.L':'_L-r--'-__'~! i
l- Ii- " --r-- \ !i
fl~~l .: \ ~.-i(Ir
11 ! :, I' /'--1 1 ~ ! ,.... I ~
i! . 1 '-' ;" ~ \ ,L.,
! ; "', -,"' --
i ~ i -1 f i _ .,"'"--:w ,,' ",,~~,...,~,..~.,~
,-...1. ~-t.-+ r--r-(\Uf4{ i-'''? '; ~',_
i 'i I I ,\ . 1 f,l
\ I \ III ; ;t'~<"4
~ ' , , I ; -/ .,.,_ ", ,
c '~, F! ~Ll k"'''\ ! f -;
~ L~ Ll r to';> a j ',;1'1
' , , 1 I ''''O~'_~'^" i..
l ' -, "'-"1 .... '/-f'
~,L-=j ex'..l I ~l Ii J-'
r: Y i bP~(, I, ,) '-~,'~~~-,~ ',J ,'.',
~ It . \ ,
-fJ...t ~I -I i I
~W' ' ! -W,J, ~ L-," ,j...,~, i
( I ~/ j'IJ.--,!
",.::~_l:o.L_-L~ Lj-+1J . ,! ~-1
,----".." ' 1 ~ k. ~
: - ., ~lr/'....\~
f"._J, (,1\//11
L-.... l '"I I ! "
" .....u t -L~u
t~,l' l~ I r rr, r I'
! I f i J !
i l " \ I, I, ' 1 I
" . , . I
! !, i ~ ' .
r -I> \ " ,I J I OtlJ{~".
I \ ~~ ,..J. 1-,L-1 Elf
....... · ~i.j 'f"'lr_o,'
i ~"-'~ \ i ) IJ
! ~l~' )"
; \.~
r--~'""----i
,
~"
\
'"
~. <
~~~,
~ .?,~:;q;r~f~~~ata\Ca~UR!~:~:::r~~!~7~W,~~~t~~~~
r-----.
i
,--,_.-.~
~...._._../
A'
.~~.-- :
!
~-~._-_._--
V'-
'"
i'--L;
<;.r
~-<!
~L~
..
~-
....huj
Legend
Water Mains Water Facility PressZone
Size of Pipe ii:l Booster Station liE 240 Zone
- 0 . 4" is) Corrosion Control Fac E 398 Zone
- 6" ~ Pump Station 11 E 490 Zone
-8" ffiTIWlter ~W256Zone
- 1 0".12" i!~ Right of Wly W 256 Zone Boosted
-16"
T~-..~~
I !
" /'
i. I! ~.__,~./
~, ~ . I
. \_.v. 1 ~~
,~:J. d ~ lj
i"""_+"'-T{ "1 r- ,
u I., € \j I' i ; J
~i~ il~/}
'I . i 1 ;"i V: _//
J. <, .r A,G
,. -. ~ r . ,_I.-~?"
. t j ~ .. : ~~ v
f~'r'-'--"r-~"i 'f ,;,""
I 1-j i ~.. -; ,/?"
~ iI' l;,' ,~,
f i I! f...",
,L,...Il,.._.L~"~~~...,,,.~_~,_!.=~.__._~"'P">"'
; I 1 ! i
11r--,' i I
j 8 h < ,
c ~ !;
-<~4 ~ r--~ t
f'=t- t===:=i l
-18".20"
-24".36"
ml W 440 Zone
IIw 517 Zone
mW 580 Zone
W 650 Zone
';':, Wltershed
, <
@~lIs
. Reservoirs
Water Valves
~ PRV
\
\
'&~~ -
(
i
!
I
I
I
(
\
--1
I ~ I
- i
. --. I~
r;....... .~_._.__>
'-;'~~~=~J-~' '-
( ,
"J
Legend
Water Mains Water Facility PressZone
Size of Pipe g:j Booster Station ~ E 240 Zone
- 0 - 4" G) Corrosion Control Fac E 398 Zone
- 6" ~ Pump Station II E 490 Zone
- 8" I2i]VVater . I W 256 Zone
-10"-12" ~ Right of VVay W 256 Zone Boosted
- 16" V:'i W 440 Zone
IIw 517 Zone
Ii W 580 Zone
@ I/Iklls W 650 Zone
. Reservoirs
VVatershed
)
~ PRV
Map Documen~.(i:\GIS:(fata\CatiaR R~esi-VVater system\~terSystem1"'()6.mxd)
113012006.-.~:57:~3 AM ""","-> J I
()
~
,)
~
",/
~ ---.
~--,.~....
\,j
pJty of Bremerton
// Water System
// 'J FIGURE 1-3C
~ Le~end
J / Water Mains Water Facility PressZone
l f
I / Size of Pipe ~ Booster Station E 240 Zone
;.j;~,/
! ./ /" - 0 - 4" G) Corrosion Control Fac E 398 Zone
i ,
/ / / - 6" ~ Pump Station II E 490 Zone
/'./ l - 8" [ill Wlter II W 256 Zone
./"../ , -1 0"-12" ~ Right of Wly W 256 Zone Boosted
"..- _<;i' 'l'~
i-"/ /'<"~l - 16" tt? W 440 Zone
, f' ~#'~' / '-. ~
r'<,w<_.\<_w") -18"-20" IlW517 Zone
.1 j . ..
l '...",j"-- - 24"-36" I !I!llI W 580 Zone
y
I 'i " @ Wells W650 Zone
t ~ p} f
\. \ '" /'" 1 . Reservoirs Wltershed
'l',. h-_V ,.!-""...." "-
"('" /; ,; Water Valves
\ ,'i / <!. PRV
;ry'..,..~:" i/ ,,/ ~l-/r \1-,
~')""r_...L..".;;p~,r ,1 I
i
I
J
,t
Map Document: (T:\GIS-data\Cahall Request-Water system\'AtlterSystem1.06.mxd)~
113012006 - 7:57:53 AM ;'"
~ "
;ii)ffi11
t=t
:=;=
~~~"
, U\., I ,
<-~~~-
. sAy
;~
:-H-
.,-::
, ,
,~'IrrlL 'I.
~1b-I~H-.'.';"":,'::".'. '..':"
~[ "cttI'
~ I I ", 'c~.i+F
-=r " !I II "
==::j ITJ:/: ~"
~ '~II ll'
=t
'~~
~
!lJ
'W
,: ~
~i ~
n
~II.-<
M:,1i
~",'~
IIU,' 13' _ '"
d~ __. -KIahapie I
, I
1/ \ h
tti. I ~ I
I ~tahUYeh lake ~ommunity Club
~:h 1
~ ~111!m]_~t
1/ I' 41
II!#' I I
w 1-.'
.~~
~ I-.F:l/
"
J!j
<<-~
,1 //
l:.~~'.
1 "".~litf~ [
.".....1>,11 :
1 I
'=nn-iH
tr,~-+1~ !
I fij
---'
3.~. I' ....,
Ilil I -, "'II' ,
I ~plll~I):
;,",;~ ~~ ! : ! ; imTIrt
.'.. r----:!t::';;;ili
", W illJ )1
;---;1111 I
il:~
i r!r!:~
!; Hi! _~ I!,; j i
h~,:,1
'f:::L~~
~ !PII'-i!! '\ "
! I I i
I ilL
."u n I'~
c,_,
'I"
o
-<
(n
(j)
~
~
;>.
CHICO
',-
fTi,IJ!ri4.\ li~i~,_')'i I' J' WJ I i I.n,,"
.. ...., J--!-J. '1ii , ,'-w,' ", u.uJ ' kPJn.Sl;,; I;'-! "I[
,/ UII~~' \ 0'"--1' y,,' :--:t),j7'i<. I , ' " I " J c:;--cl,'
-" T ~::::_""'- i 'Y \ '2:h; I \ i' ~
liil[i.Ii!Ii;-L!!.j;/,""'_ -;;;V' ' 'U' ' , I \! ~ 0
~..I c): I i f-ti!IWllli",ill, I ::::::R i Iif\4i'~ ' , ,
U ,'I /: .i ~ ~ '/1 I ,r::::t-'++'L',; ~,'''
, ! , ! I "'''fu''!': It '",' , i ;: w,+'n' ,
I . I, .11 ,~-~I ! ! :---HIJ l;rH+< ; '. -.
r ~, t: ~+;J i !TT!i~, I' '_'~; ,,"u,'~'
! I i ~~:p~ i; ! h I I!! I Ii
: ! i I ~ ii'! i I' "I'
, ! i ' ! ~-,--,--r+H ~LH'-l i' " ,
I ~ ~ili!i, :, !If---'
I II I , ~ l'i'l ilili!~-j
L I I I 1!!I4--,h-/
'U i! i, :';':' I I
I I -J :!' i,l
i '...------r: I I! I l~
I I I i I i !TlI'~t'
I ' I I I I I I ! I ; t~ I I A-JI ~
-.L.J : ,i i I I I I I=,,,, ""i ' ,
CI I I IH 1-I:IIfrn ~
rt- I I I ~Ii 1=11,1 I~H'
; i : ! f-c-HIIII" I HL
'u 111::r I
I I I '1 (i
I :1. ))
n City of Bre[llertW
~ .1 L //
; [. I
,--, ,
I : I" "-- "
~- I ~ I - ~~ .." ~
!-i-i+i ~h~'1 I I ill'~: -if ~ I I ~~ ~ fili'
1l1L.::, "'1 I I 1I~ Jl V /II il I 1-",' Ti, I 't / liFT I~)<
H:::::L,y:' "I'I'~ /,' N \{ ts= I
f.- f-H CJ , " H- K' ';H I\- ~'=-
I ' ~'. ,I ;--,-:jGi0:', 'rk. in' " , ~:+- f+ ~ m !? '~ I-f
=--:0 ~jc I .r= , ' -.J / H-- ~~ ~~0 (~ I
[i::t~d ',~ III I I ~C\'tJ-i ,Cf: ~';1-- < ill ,
~i~_b ~I ~'> ,,:f~~II!I'-/~ N\\ ~j I:~:~" ,~
i;=j d/T J/ :Y BH~' " ~~ ,I ~// ,r';1 f-PVTY\ d6~ \ ~2c "
b-i-----' , I I I'" PI ::i.4\:O.---i -, I
',I " I 'u~ ' ,f;t', I
,lrLJ 10 \ I '< I till1 I'\~'~~ 0'
~: I '~, " I M---1]=~' ,;'
1-,- , I ,~ ,'~' _ --+---1 I '=- ---q f ~--RT
--1 V~ ,/tk '~'II ' ~~ === .' or..", 1,'- ,
i i -t:u-=~ty,:!Qmoil[Q1rcl'1 ==;~" " n latibn'''-j ,
_~~I ~_ II ; ~~;'~d(~i~~~eoG ":l-~~"-~
i-l:l-lLLU:: I I I ,I 111----, ' '1' \\ ,_---.I,
~ \ I L.. ,U I_I ! I i I i '~.flD-, Ic\~'-'" ',' --~
~~-' " -----.L __I 1=r::.:=c::J I I I ~.--"j tj, ':~" '"- I
1 L_!-----1----------.l-~1 /-~ I~I ~- -r--h:-~.- -L,~t .~ ;:r+-L-+--- ,i --l I
, I ~,_L...J I/'-----r--t=-r-,: 1~1 I I ~~ - '-\T - ~,-t= -':.-.y-,::::q~ p;J-J-=
\ I LL_LlLt I ! :yj I ',I - ~' , 0 tL Cri ' -;0; R=i=q--- -,--; '::=L = I
illl1111111 ~!~ r;./' i :I~r ~ ,It :NU'ii~~t-f'r= ~~H
II' ! I II l-t-rl' i I ~ ~.-J TTZ'" '--.1\ '3::r.r-~Wl ~::;:Etl@=-~,=-~gt --'-.0,' ~-,'" " :r81'''' ~
I Iii --.J.....J I I' qy,,,-.>) --LL!0' !/ / =c, 'ri-==:=;r.-:=;:!'" c, I C I !T
; I I I , I I ! j : i i I I i I r-:-i " ' " .I -;" --,l.U..' , :' nlTITlll h-ri-ri I ;;;r I H ,tL i
BAY
1(11~
J ~ OSTRICH
BAY
...
>0",
.~~~.\
fauo'
"und~ "ava
-:
I u I~~ I
\~\..~~
'\i
~\C\J'-\R
S\\"
r'
)j~'
f:LH I "
tB-r-8d;'
HilI
BURKE
BAY
A
Q:J'"
~
;?:-'"
~
,,0
~
~O
.
.
-./,. ,
'"
c
o
I I'l! HlfBai~e I~~!-u\
t :, ~ :_l i;-++-n LI~. '
~~:'-~~\~ll! \
i I!~ '-' ~ el j _I t
-i if 1::---: ~'
rl'l"" , '" 1"
I I ,
.. f' ~-fi~'1 ~.,
_ ~I 1111!1 U1!-,,~
~',,--....'----II j ~,;
mel ': " ',\ I "
~ ::rJH-I 'r~-<lI'"
~ :l'~ en;, n\,
>-
-<
(])
o
a::
-<
I
o
a::
o
f-
a::
o
Q
-<-
,?-,G
-. ".--:;.:
~ "
""- ..'
':?'
':;oJ ,l'"
" I' ,
",~ I~ ''i!
-;, l1111cDl 4:~ '"' ',"i.""
1 ll"".rl~ :1+:1-:"
I Illi ~. w' "
--W Ii-'
----+-:--i I
-0
'70'
~
Q~
CLAM BAY
'~j
" U,S, Navy -
Manchester Fuel Depot
YUKON
HARBOR
",.' rc
-Pi ..
",Ii 1,10
I:'~~ tt:lC ~l,*::~~:lj~illl " ,t;i;~
. -.' L~VWAWater.
L 1"11 ,: ~, ;",: ~ .)!Jil~;@:P Southworth
r-g~ I 'Jilll~
',5~'i:":Jl! 'T'= KPUO,
0-i I I, , Driftwood Cove
:,-.LU1l11 -~
I.II! ~~I
", I
IT,!: I
F
,~
Frl--l i--rt-'-rj1kJLilj;iE---r~
fWQ-~ci PJ;;f--=:<-'-O
~ ~= ::t:: t~ C ~ ~ ; r::j
I I !illIl ..;--~"\- In'- ' I:; ;-iil ~ i ,L
~ . ''':'',~m.LlllJ-II''L
,I , _, · ' ~ ~ :,_,,,~41~~'#:~i::
&
0'
<%1
n""
MURDEN
COVE
.lXm
'\
C.O.B.l..
Rockaway Seadl
r I1A,RaOR
',' ';
", \, (
~
KITSAP COUNTY
WASHINGTON
Coordinated Water System Plan
City of Bremerton
Service Area
Legend
CWSP Service Areas 2005
Water Service Area Type
DCity
D Federal - Navy I Tribal
D Kitsap PUD
I~I Northwest Water Systems
I~I Other Private
;:::;::;;-;::: Uncontested Overlap
D Washington Water SelVice Company
I\",;'.~I Water District
I I Satellite Management Area
C.W,S,P, Adopted May 9, 2005
(J,V Map Created May 26, 2005
~lF-
'"
q;
Lambert Conformal Conic Projection
North American Datum 1983
Spheroid: GRS80
State Plane Coordinate System
FIPS Zone 4601
Washington North
8'
o 1.350 :>.700
- -
5,=
8,100
""'"
''''
General Location of View
'Within Kitsap County
City of Bremerton
2005 Water System Plan
Figure 1-4
Kit,s~p pun
"___~~40.~~
Kitsap Public Utility District
P,O, Box 1989, Poulsbo, Washington 98370
(360) 779-7656' FAX (360) 779-3284
Product of Kitsap P,U,D, Geographic Information System
2005 City of Bremerton Water System Plan
Section 2
Planning Background Information
2.1 Existing/Future Service Area
The City of Bremerton Water Utility serves approximately 57,000 residents in its water supply
area, which includes the Bremerton water service area (city limits and portions of unincorporated
Kitsap County) and other areas with service agreements. These areas were described previously
in Section 1, Table 1-1 and Figure 1-4 (service area map). Continued growth is anticipated
within the current service area. Approximately 90 percent of the Bremerton service area lies
within an Urban Growth Area (UGA). UGAs are specifically designated for growth at urban
densities.
Service areas - both retail and wholesale - are determined through a process described in the
Kitsap County Coordinated Water System Plan (CWSP). Retail water service area boundaries
are established by agreement between the water purveyors. Bremerton has service area
agreements with all adjacent water providers with the exception of the City of Port Orchard,
which is still under discussion. The CWSP provides the legal mechanism for water utilities to
establish an exclusive retail service area. A designated retail service area denotes a specific utility
has accepted responsibility for development of cost-effective and efficient water service to
accommodate the future growth these areas will experience. Growth management objectives
established for these areas must be accounted for in each utility's approved Water System Plan.
The establishment of retail water service area boundaries carries two obligations:
1. The county and state governments recognize an identified utility as responsible for providing
all retail public water service within a designated area, and
2. The designated utility shall assume responsibility within its service area for planning and
implementing water system development and proper utility management.
2.1.1 Bremerton Service Area within City Limits
The entire City of Bremerton is within the "Bremerton UGA." Although most land within
the City is already developed, Bremerton is planning for significant growth through infill.
The City of Bremerton 2004 Comprehensive Plan lays a foundation for an increase of
about 12,000 people between 2004 and 2023. The Comprehensive Plan proposes changes
iIi the comrnunity design ethic, as well as emphasis on regulatory incentives. Bremerton
is anticipated to attract a larger percentage of the population growth than in the past. The
Comprehensive Plan's key urban design model is "The Centers Concept," a mixed-use
urban village approach to planning. Population growth for the City is largely calculated
on the ability of strategically-placed, mixed-use activity centers to attract new residential,
commercial, and industrial uses.
Planning Background Information
2-1
2005 City of Bremerton Water System Plan
Approximately 58 percent of the City's growth is expected in the new "Neighborhood" or
"District Centers." Bremerton will position itself to attract development requiring the
modification of existing zoning categories to provide sufficient industrial, commercial,
and mixed use lands for business opportunities. The "Centers" approach builds on the
City's initial focus on the Downtown Regional Center.
Initially, growth will continue to focus on urbanizing neighborhoods on the edges of
Bremerton. This pattern is most evident along the Highway 303 corridor north to the
Silverdale area. In addition to Bremerton's Urban Growth Area, the City recognizes that
its long-term health is tied to a larger area of interest, identified in Figure 2-1 as the
Eventual Growth Proposal Map. Existing and future urban areas in Kitsap County, under
growth management precepts, should be associated with a city.
2.1.2 Bremerton Service Area in Unincorporated Kitsap County
Much of the unincorporated part of the Bremerton service area has experienced
significant growth in recent years. This trend is expected to continue into the future,
particularly in those portions within a UGA, such as:
. North Manette Peninsula - The area north of the city limits and south of Waaga
Way within portions of both the Bremerton East and Central Kitsap UGAs.
. Sherman Heights/Navy Yard City Area - An area south of the west Bremerton city
limits and north of Gorst, which is within the Bremerton UGA.
. South Kitsap Industrial Area (SKIA) - The Bremerton National Airport and the
Olympic View Industrial Park are designated as a stand-alone unincorporated joint
planning area.
e Gorst - An existing commerciallindustrial area at the head of Sinclair Inlet, which is
designated as the Gorst UGA.
2.1.3 land Use
Figure 2-2 shows comprehensive plan designations in the Bremerton water service area
indicating what type of development is authorized for the property. Excluding the City's
watershed and utility lands, a breakdown of generalized future land use categories
follows. Approximately 54 percent of the service area consists of urban single-family
residential land use. Roughly 1 percent of the service area consists of single-purpose
multi family residential land use. Twelve percent of the service area is designated for
mixed-use commercial and residential "centers" land uses, and an additional 5 percent is
designated for single-purpose commerciaL Industrial land uses comprise a total of 23
percent of the water service area and open space and parks make up roughly 5 percent of
the service area. Industrial areas include the greater South Kitsap Industrial Area (SKIA)
and the Puget Sound Naval Shipyard.
Planning Background Information
2-2
2005 City of Bremerton Water System Plan
City of Bremerton
Eventual Growth Proposal
2004 Comprehensive Plan
D Bremerton City limit
o Eventual Growth Proposal
~~, Roads
,I
(~i
f-;~~;,/ ,/
/j:f;~>
l~" ;7' (;~ J
"d.') ;'
/
/:;1J~,
,f
I
f
~. ,
I~~_~A-:;'~ : I
A-,~~;~fk .Fi \ ~L!,i . ~i-T-'
( ~--.-.-,.(1 trf r.... I )1 .) J ,"'O...L-__.L.LJ
----,n:- -~- ~ j I-r- f "___1:;", lJ! ~ I 'I
~/ ~~~~f"lp.)n~~}Tt3~U]
__-:,/ .1'r'JL'~'-, I, I,ti :J-I['~/',r'.,' c-c,
-_c_!',\1~~i~:,,~tttLI7;f~~
, /- .' 1'::;1 :r!_~I;"!1 iF J -' ._./
,L_~:LF.tD. '~-~1=-lr*1~--L1~,i~:-
/.~n "nJ "1 T".nj n_ ""'nl ,
1 . y~1~~_'/[~j1,r~fTlrJ
" j ,J'..I..n, '-T~! ~,.
L<~~~T..n~.' )e\'~~r~l!- ;; 4-
i-m1 I '~-l F~\,~-1, I "i-, .
'I rr~ii"1~ T I~
,/ l_~~_) I _ I 'i Ii. -T" , i
~S[J:J i~njJ :L:JJ jlm~t,,!;irg:HT~~~=~'
. i i__I' rT~il~J~J},:~~r~ ,J
. n, ' I -' 11.1 i I I' i
;7
/,'
/5:--
/f
"
I
L. _
'i-~
"
I
,i
LJ
7t1
i~E, ..
/
i-------------.----1"--_~
-,
'( j'
L~-jj'
Figure 2-1
Planning Background Information
2-3
2005 City of Bremerton Water System Plan
City of Bremerton Land Use Map
E.~~U::':'&oun<:'~f't
LEGEND
c:)t.S=
.. 1'<~7~1~5"ltH
_l..~~C",""nf"'~
L~l:'J~r.1"
_~"\lUI:1.a';'"
\/
~ :J,....~ 1'!!'~l':or~
C~C<VI:ifi~:.;:v..nr.."i<llO!'IIl;l1
-~,.".=
_H"""""""
_ T~=r~.\,,"w"'+.;I'>ll:>J:;lt.:~~..
V~W~l'!..)t>.<<""rICOf;lQ(7
CqIr...1':)L3r:l&
Opf~~!'3U
IIIIiIII"QarVoelll;l"Co
_"'Of.IE,,~.T.~"~
1~I!N~~5L;oi>O""~":;
_r_i)'t~1
I
L_J
/
Neighborhood Centers
District Centers
Downtown Regional Center
Reserve Center
~I Employment Centers
~;oo :!E~
- -
~700 Ft9I
Adopted on 12/Q1/04 by Ordinance i'4917, Effective Date: 12117104
Figure 2-2
Planning Background Infonna/ion
2-4
2005 City of Bremerton Water System Plan
2.2 Related Plans and Requirements
Several other existing plans and requirements must be considered in the planning of a water
system in Washington State, as described below.
2.2.1 City and County Comprehensive Plans under the Growth
Management Act
The state legislature passed the Growth Management Act (GMA) in 1990 to require
coordinated planning for projected growth in the faster-growing counties in the state. The
GMA emphasizes control of "urban growth," including the type of growth, its intensity
and location, and the utilities and services it needs. The GMA requires all urban counties
and their cities to develop and adopt 20-year comprehensive plans, along with regulations
to implement those plans. The plans must address specific issues, including but not
limited to, land use, transportation, housing, capital facilities and services, natural
environment, and economic development. The act has been amended in subsequent
legislative sessions.
The GMA requires local plans to be consistent with GMA requirements. If the
comprehensive plan cannot show the provision of adequate public facilities and services
to supply new development, the plan must be changed to allow only the amount of
development that can be provided with adequate public facilities and services. Sanctions,
including withholding of certain state revenues, are authorized for non-compliance with
the GMA. Highlights of the GMA, as it pertains to water plans, are described below:
. Urban growth. Encourage development in urban areas where adequate public
Jacilities and services exist or can be provided in an efficient manner.
. Reduction of sprawl Reduce the inappropriate conversion oj undeveloped land into
sprawling, low-density development.
. Economic development. Encourage economic development throughout the State that
is consistent with adopted comprehensive plans., Promote economic opportunity Jor
all citizens oj this State, especially Jor unemployed and Jor disadvantaged persons,
and encourage growth in areas experiencing insufficient economic growth, all within
the capacities oJthe State's natural resources, public services and public Jacilities.
. Permits. Applications Jor both State and local government permits shall be processed
in a timely and Jair manner to ensure predictability.
. Environment. Protect the environment and enhance the State's high quality oj life,
including air and water quality, and the availability oj water.
. Citizen participation and coordination. Encourage the involvement oj citizens in the
planning process and ensure coordination between communities and jurisdictions to
reconcile conflicts.
. Public facilities and services. Ensure that those public Jacilities and services
necessary to support development shall be adequate to serve the development at the
Planning Background Information
2-5
2005 City of Bremerton Water System Plan
time the development is available for occupancy and use without decreasing current
service levels below locally established minimum standards.
. Capital facilities. GMA cities and counties must demonstrate that they can afford the
infrastructure needed to support expected growth. If the services cannot be provided,
the land uses must be revised or the levels of services (LOS) reduced.
. Comprehensiveness. Comprehensive Plans must integrate planning for land use,
housing, transportation, capital facilities and utilities. All areas of cities and counties
and all plan elements must be addressed from an area-wide perspective.
. Consistency. Comprehensive plans must avoid internal contradictions and must not
interfere with the successful implementation of the plans of neighboring jurisdictions.
Plan policies must be consistent with the direction established by the GMA, Vision
2020 and adopted county-wide planning policies.
The GMA requires counties to establish "Urban Growth Areas" (UGAs) to help guide
urban growth into the most appropriate areas and to reduce urban sprawl. Kitsap County
has established several UGAs, including UGAs in the greater Bremerton area. Some
UGAs are associated with an incorporated city, and some UGAs in the greater Bremerton
vicinity are "unassigned." Unassigned UGAs are found north of Riddell Road in East
Bremerton and south of the City in the South Kitsap Industrial Area and other areas such
as Gorst. UGAs associated with the City of Bremerton may be annexed into the City at
any time. Unassociated UGAs are intended for urban-style development, but are not as
likely to be annexed into a city without prior association of the UGA with that city. The
following identifies UGAs in the greater Bremerton area and their associations.
Regardless of association, substantial portions of some or all of these UGAs will be
provided water service by the Bremerton Water System.
Greater Bremerton Urban Growth Areas:
. Bremerton West - Includes unincorporated areas adjacent to West Bremerton such
as Navy Yard City and the Sunnyhill Road unincorporated "island."
. Bremerton East - Extends north of East Bremerton to Riddell Road.
. Central Kitsap - Unassigned. Extends north of Riddell Road to the Silverdale
UGA.
. Gorst - Unassigned. Includes the urbanized area at the head of Sinclair Inlet.
. McCormick Woods - Unassigned. Extends south of the former Northwest
Corporate Campus to the McCormick Woods golf course and nearby residential
development.
. Port of Bremerton/South Kitsap Industrial Area - Unassigned. Extends south of
the Bremerton Watershed to the Bremerton Industrial Area and Airport.
In addition, the County has established several "Urban Joint Planning Areas" - areas
designated as Urban Reserve or Urban Industrial Reserve that may be needed to support
future growth. These areas will be subject to coordinated planning to determine how each
area should be configured, designed, serviced, financed and/or governed.
Planning Background Information
2-6
2005 City of Bremerton Water System Plan
These joint planning areas are located adjacent to City of Bremerton UGAs and within the
Bremerton water service area.
Greater Bremerton Joint Planning Areas:
. Port Blakely/ Kitsap Lake South - An area southwest of Kitsap Lake adjacent to the
City of Bremerton incorporated Port Blakely properties west of Kitsap Lake.
. Gorst Area Urban Reserve - Areas immediately west and north of the Gorst UGA
extending toward the Navy Yard City.
. West McCormick Woods - Areas adjacent to the McCormick Woods UGA to the
west and south and extending toward the Gorst UGA.
The GMA requires cities and counties to enter into agreements for ongoing coordination
of their comprehensive plans. Agreements must specify how all major aspects of urban
development will be managed, including the extension of utilities and other urban
services. Under the GMA, the City of Bremerton, the City of Bremerton Water Utility,
and Kitsap County must coordinate their comprehensive plans and water supply plans.
In 1992, Kitsap County adopted countywide planning policies spelling out the County's
intent to develop "Urban Growth Management Agreements" (UGMAs) with other
jurisdictions to coordinate planning and growth activities within established UGAs. The
City of Bremerton and the County have not yet developed an UGMA for the Bremerton
UGA. To ensure coordination of public facilities, the UGMA will contain at least the
following provisions:
. Establish a method of sharing net revenues, services, and expenses (if appropriate) in
annexations of significantly developed areas.
. Consider pre-annexation agreement issues related to the provIsIOn of urban
governmental services.
. Designate level of service (LOS) standards.
. Identify services to be provided in the UGA, the reasonable purveyors, and the terms
under which the services will be provided.
The City amended the Bremerton Comprehensive Plan in 2004, which includes a Capital
Facilities Element and six-year Capital Facilities Plan (CFP). The CFP is a six-year
finance plan that identifies expected costs and sources of funding for needed facilities,
including water facilities. The CFP must be amended annually to stay in compliance with
the GMA.
Kitsap County submitted its Comprehensive Plan to the state in December 1994, but it
was appealed to the CentralPuget Sound Growth Management Hearings Board and
declared invalid in 1995. The County adopted a revised plan in 1996, which was declared
partially invalid in 1997. This was followed by the most recent plan adopted in May
1998, and in February 1999 the Hearings Board rescinded the invalidation. Non-
compliance issues regarding joint planning areas were resolved in November 1999 in all
areas with the exception of the Port Gamble Joint Planning Area. The County's 1998
Comprehensive Plan was amended in 2002, 2003, and 2004.
Planning Background Information
2-7
2005 City of Bremerton Water System Plan
To be consistent with the GMA, the Bremerton WSP must address how the City plans to
provide water to expected new residents over the next 20 years. The WSP includes a
, '
financing plan for water facilities. Information from the plan will be summarized and
included in the City's CFP during each annual update. The water financing plan will be
updated annually, consistent with the GMA. The annual updates will supersede the WSP
financial plan during interim years until the WSP is again updated.
2.2.2 Municipal Water Law
In addition to the importance of conserving water for fish, growing communities,
agriculture, and industry place an increasing demand on Washington State's water
resources. To help meet these growing needs, the state legislature passed the Municipal
Water Supply-Efficiency Requirements Act, commonly called the Municipal Water Law
(MWL). The MWL amended sections of the State Board of Health Code, the laws
governing public water systems, and sections of the State's Water Code. These changes
affect the water system planning process, provide greater certainty and flexibility for
water rights held by public water systems, and more closely tie water system planning and
engineering approvals by the Department of Health to water rights administered by the
Department of Ecology.
The MWL allows for the expansion of the place of use of a municipal water supplier's
water right to all areas included in its service area, as described in an approved WSP.
Expansion of the place of use on a water right through an approved WSP now requires
local government consistency determinations. Consistency determinations should reflect
the water system's entire service area. The MWL requires DOH to ensure consistency
with local adopted plans, regulations, and polices (including CWSPs) and establishes a
municipal water supplier's duty to serve within its retail service area. Ensuring local
government consistency is the responsibility of the water system.
Sections of the MWL pertaining to water system planning are:
. Municipal water supplier definition - Provides the definition of a municipal water
supplier and establishes municipal water supply purposes.
. Water right connection/population limitations - Clarifies the State's Water Code
by stating that the number of water service connections and population are not
limiting attributes of water rights for water systems that have a DOH approved water
system plan or other approval that specifies the number of connections.
. Plan review coordination between DOH and the Department of Ecology
(Ecology) - Amends the State's Water Code directing DOH and Ecology to
coordinate WSP approval procedures with water right determination procedures for
WSPs.
o Service area consistency - Allows a municipal water supplier to expand the place of
use on its water right to all areas included within the service area described in its
approved WSP. This benefit is provided if the water right holder is in compliance
with the terms of its WSP, and the service area is consistent with applicable approved
comprehensive plans, land use plans, development regulations, coordinated water
Planning Background Information
2-8
2005 City of Bremerton Water System Plan
system plans, and watershed plans. Place of use is not reduced if the service area
identified in an approved WSP is smaller than the place of use in the water right.
. Conservation requirements - Provides direction on conservation to municipal water
systems with 1,000 or more connections. This includes reporting the conservation
measures the utility has put into practice in the past and how those measures have
increased its water use efficiency.
. Current conservation programs and the conservation rule - Directs DOH to
develop water conservation rules expected to be finalized in 2006 and to involve key
stakeholders in the process. Municipal water suppliers are to continue to meet current
conservation planning requirements and implement their current programs.
. Local government consistency and duty to serve - Requires new services within a
water system's service area to be consistent with applicable, approved local land use
plans, comprehensive plans, and development regulations. Water utilities must
delineate retail service areas in their WSP. Water systems with DOH-approved WSPs
now have a duty to provide service to new connections within their retail service area.
. Reclaimed water-Requires systems serving 1,000 connections or more to evaluate
reclaimed water opportunities.
2.2.3 Other Related Plans
Table 2-1 describes the plans that were considered while developing Bremerton's WSP.
Table 2-1
Plans Related to Water Svstem PlanninQ
Title Date Summarv
Bremerton Comprehensive 2004 Developed to comply with GMA.
Plan
Kitsap County Coordinated The Public Water System Coordination Act of 1977 designates Kitsap County as a
Water System Plan (CWSP) 2004 "Critical Water Area" and requires plans to maximize efficient, effective development
of public water svstems consistent with regional needs for critical water service areas.
Began in EHSB 2514 provides funding to initiating governments for WRlA-Ievel watershed
Kitsap Peninsula Watershed 2000 planning and basin assessments. Kitsap County received a total of $870,000 to
Planning (WRIA 15) Vetoed in 2005 conduct studies and prepare the plan. In June 2005, the Squaxin Island Tribe vetoed
the nlan, which halted the nrocess.
Water Supply Plan for the 1999 Projects water use and capital improvements needed fur this area.
South Kitsap Industrial Area
Kitsap County 1998 Deve]oped to comply with GMA. Amended in 2002, 2003, and 2004.
Comprehensive Plan
Kitsap County ]997 Developed by Kitsap County PUD to evaluate existing data on water and assess data
Initial Basin Assessment adequacy to make decisions about pendinQ water riQht annlications.
Water Tech Memo #2 Kitsap 1997 Projects water use and capital improvements needed for this area.
Lake Technology Park
Kitsap County Groundwater Vol. 1&11 199] Provides an analysis of groundwater related data in Kitsap County, action
Management Plan Vol. III & IV 1996 reCommendations; and supporting documentation for protecting groundwater
resources.
Bremerton Gorst Basin ]996 Describes the hydrogeology and hydrology ofthe Gorst Creek drainage basin.
Study
Bremerton Wellhead 1996 Delineated ]-,5-, and 10-year time of travel protection zones for City production
Protection Plan wells.
,J\..djacent purveyors' water Various Includes WSPs for the City of Port Orchard, and the fol!owing water districts: Rocky
svstem plans Point, Silverdale, North Perry Avenue, Erland Point, and Sunnyslope.
Planning Background Information
2-9
2005 City of Bremerton Water System Plan
2.3 Population Estimates for the Bremerton Water Supply Area
The residential population estimates for the Bremerton water supply area are presented in Table
2-2 and Figure 2-3 and include estimates for years 2000 to 2004, forecasts for years 2005 to
2024, and methodology used. The forecasted population used for this WSP is about 12 percent
lower than the forecast required for use in the 1999 WSP.
The Bremerton water supply area consists of service areas requiring population information for:
. Bremerton Retail Water Service Area - City and adjacent unincorporated areas
. Puget Sound Naval Shipyard and Intermediate Maintenance Facility
. Jackson Park Naval Housing
. Rocky Point Water District Retail Water Service Area
The West 517 Zone water system is not represented in this table, as it is designated a non-
community system without a significant residential population. Water use forecasts for that
system are discussed later in this section.
Several areas of proposed residential growth in the Bremerton Water Service area include:
Within City Limits:
. Waterfront Condominiums (W256 Zone). - In 2005, construction began on 144
condominium units in downtown Bremerton.
. East Park (E398 Zone)- This 40-acre area of former Navy housing was transferred to the
City of Bremerton and sold in 2005 to a developer who plans to construct 425 residential
units of single-family homes, condominiums, and apartments.
. West Hills (W440 and W650 Zones) - Over 400 acres are planned for development into
mixed use industrial and up to 450 residential units.
. Sinclair llidge (W580 Zone) - This 188-acre property in the Anderson Creek area was
previously considered for industrial/commercial development. In 2005 the property changed
ownership, and the current plan is to construct a residential development of approximately
1,500 single-family homes.
. Bayview (W580 Zone) - This 40-acre area is being developed for residential use.
e Port Blakely (W440 Zone) - This 440-acre development proposes mixed-use with a
projected 900 single-family equivalent units.
Currently Outside City Limits:
. Tracy ton (E240 Zone) - This 39-acre parcel was formally undeveloped land owned by the
Tracyton Water District. It was transferred to the Bremerton Water Utility as part of the
payment for assuming the water district in 2004. In 2005, the City sold the property to a
developer who plans to construct about 100 single-family homes.
Planning Background Information
2-10
2005 City of Bremerton Water System Plan
. McCormick North (W580 Zone) - Approximately 1,500 homes are anticipated to be
constructed over the next few years at this site just south of the City's property at Anderson
Creek.
Table 2-2
Residential Population Forecasts City of Bremerton Main System Water Supply Area
Year
Bremerton Retail Water Service
Area Population
Inside
City
Limits
Outside
City
Limits
Total
-
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
35,103
34,009
33,184
33,289
32,078
34,431
35,002
35,572
36,143
36,714
37,285
37,856
38,427
38,998
39,569
40,139
40,710
41,281
41,852
42,423
42,994
43,565
44,136
44,708
45,208
13,211
13,246
13,282
13,317
14203
15,090
15,977
16,863
17,750
18,637
19,523
20,410
21,297
22,184
23,070
23,957
24,844
25,730
26,617
27,504
28,390
29,277
30,164
31,050
31,937
48,314
47,256
46,466
46,606
46,281
49,521
50,978
52,436
53,893
55,351
56,809
58,266
59,724
61,181
62,639
64,096
65,554
67,011
68,469
69,926
71 ,384
72,842
74,299
75,759
77 ,145
Population Served by Bremerton
Through Contract
Total
Population
Served by
PSNS & Jackson Rocky Point City of
IMF Park Navy Water Bremerton
Housing District S
ystem
-
109 2,047 1,636 52, I 06
1,040 2,211 1,646 52,152
1,972 2,374 1,656 52,468
2,903 2,538 1,667 53,714
2,903 2,539 1,704 53427
2,903
2,903
2,903
2,903
2,903
2,903
2,903
2,903
2,903
2,903
2,903
2,903
2,903
2,903
2,903
2,903
2,903
2,903
2,903
2,903
2,540
2,541
2,543
2,544
2,545
2,546
2,547
2,548
2,549
2,550
2,552
2,553
2,554
2,555
2,556
2,557
2,558
2,559
2,561
2,562
1,740
1,777
1,813
1,850
1,886
1,923
1,959
1,996
2,032
2,069
2,105
2,141
2,178
2,214
2,251
2,287
2,324
2,360
2,397
2,433
56,704
58,199
.
59,695
6],190
62,685
64,180
65,675
67,170
68,666
70,161
7],656
73,15]
74,646
76,141
77,637
79,132
80,627
82,122
83,619
85,043
Population data supplied by the City of BremertonDepartment.of Commnnity Development with the following methodology:
]. Transportation Ana]ysis Zones (T AZ) data provided by Kitsap County, November 2005.
2. T AZ Single Family (SF) and Multi Family (MF) Households provided Jor base year 2003 .and projected year 2025.
3. SF and MF Households aggregated to total number of households per T AZ.
4. Single Family (SF) and Multi Family (MF) Households for 2000fromdata prepared at time of2004 Bremerton Comprehensive Plan.
5. Kitsap Household Size from "llIl1strative HOllsehold and Person per HOllsehold Projections Using the GMA Poplllation Projections:
2005 & 2010"CTED.
.
6. 20] 0 Household Size for Kitsap County, from Alternative 2 Trended Headship Rates (assumed), see note 5 above.
7.2000 Historic21 Figure from TAZ figures used 2t time of Bremerton December 2004 Comprehensive Plan.
8. Analysis is different from 1999 WSP, as PSNS and Jackson Park populations were included in the City's population.
9, Changes from ]999 WSP: Population for PSNS and Jackson Park now separate from the City's, and Tracyton now included in Outside
City Limits,
Planning Background Information
2-11
2005 City of Bremerton Water System Plan
Residential Population History and Forecast
90,000
s::
o 80,000
+:l
~ 70,000
::J
Co 60,000 1
o 50 000 I. . . .. ·
a.. , ~II II III
~ 40,000 i
; 30,000 :
:2 20,000 i
~ 10,O~:
2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024
.......... I
......a i
~.-~.-~-- ,,_"-./31
_ ._ -.- - ~- - _ IIIl _ lit - lit .
--.--. -1IlI--~
. _. - -. _ _11- - B-
-..-. IIIl -11--11
.--.--. __IB--IB--II-- I
8 ~-~-~ I
i
I
I
I
__ Brerrerton Water Service Area History - - -8- - - Brerrerton Water Service Area Forecast
---.- Brerrerton Water Supply Area History - - -.- - - Brerrerton Water Supply Area Forecast
Figure 2-3
2.4 Water Production and Demands
Production is defined as the total volume of water withdrawn from surface water and
groundwater sources for use in the Bremerton water supply area. Production is measured using
source meters on the surface supplies and wells. Bremerton water production since 1925 is
presented in Figure 2-4. Production since 1985 is presented in Table 2-3.
City of Bremerton
HISTORICAL ANNUAL WATER PRODUCTION
4000
3500
3000
1/1
c: 2500
~
C'll 2000
(!)
c: 1500
~
~ 1000
500
1B1~ 1~1~ 1~1B 1~1~ 1~ 1_1~ 1~1m1~ 1_1~ 1~1~~
Year
Figure 2-4
Planning Background Information
2-12
2005 City of Bremerton Water System Plan
Table 2-3
20-year Water Production History
Total MG ADD MDD MDD Annual McKenna Falls
Year SW %
GW MGD Date MGD Rainfall Inches
1985 2894
1782 62% 7.93 Nav 29 14.95 36.9
1112 38%
1986 3074
2030 66% 8.42 Aug 9 15.40 67.2
]044 34%
1987 3195
2068 65% 8.76 Jun 1 16.00 58.2
1128 35%
1988 3187
1808 57% 8.70 Ju121. 17.02 55.5
1379 43%
1989 3353
2031 61% 9.12 Feb 7 17.30 50.3
1322 39% .
1990 3335
214] 64% 9.14 Dee 22 20.04 71.0
1194 36% .
1991 3178
2148 68% 8.70 Jan 4 16.65 63.0
1030 32%
1992 3096
1546 50% 8.48 Jun 25 13.84 59.8
1549 50%
1993 2821
1320 47% 7.73 Jan 24 13.71 49.6
1501 53%
1994 3027
1805 60% 8.29 Ju122 15.01 74.6
1221 40%
1995 2878
1904 66% 7.88 Jull 14.48 82.2
974 34%
1996 2987
2097 70% 8.13 Jul13 14.06 77.0
888 30%
1997 2709
1900 70% 7.40 Jan 3 14.30 90.2
809 30%
1998 2894
1764 61% 7.90 Aug 14 14.32 84.2
1129 39%
1999 2982
1722 58% 8.17 Jun 19 13.46 90.5
1260 42%
2000 2964
1856 63% 8.12 Jul19 13.90 52.8
1108 37%
2001 2753
1336 49% 7.54 Ju112 11.57 64.3
1417 51%
2002 2673
1477 55% 7.32 Jul27 14.30 58.6
1196 45%
2003 2726
1463 54% 7.47 Aug6 ]4.50 74.4
1263 46%
Planning Background Information
2-13
2005 City of Bremerton Water System Plan
2004 2804
1333 48% 7.66 Jul ]8 14.88 52.3
1471 52%
20-yr Avg 2977
1776 60% 8.]4 14.98 65.6
1200 40%
Table 2-3 Continued
Water demand is defined as the quantity of water drawn from the water system by customers.
Demand is measured through the approximately 16,000 service meters located at each customer's
connection to the City's system. All services are metered. Navy contracted meters are read
monthly, and Water Utility personnel read the other residential and commercial meters every
other month. Water demand information is presented in Figure 2-5. Average day demand
(ADD) for the six years 1999 through 2004 is 7.7 MGD. In 2001, an extraordinarily dry winter
necessitated activation of the City's Water Shortage Contingency Plan to manage the drought.
City of Bremerton
Water Demands
18 -
16
14 -
12 -
o 10-
~ 8-
6-
4-
2 -
0-
Qrnj,Jg ht Plan
lmplerrenled 7-27-02
8-6-03
7-13-04
1999
2000
2001
2002
2003
2004
III ADD
II.! MOD
Figure 2-5
In 2005, Bremerton's water accounts were distributed into the following customer classes:
Single-family Residential
Multi-family Residential
Commercial/Government/Industrial.
Irrigation
13,070
1,884
1,407
108
Water use is presented by type of use in Figure 2-6 and shows six-year average demands by
single-family residences, multi-familyresidences, commercial/government entities, and the Navy
properties. Water use is presented by location in Figure 2-7 and shows six-year average demands
within the city limits; in the unincorporated portion of the water service area; and in the
contracted uses at Navy facilities, Rocky Point Water District, and the City of Port Orchard.
Planning Background Information
2-14
2005 City of Bremerton Water System Plan
City of Bremerton
1999-2004 Average Water Use
by Customer Class
ADD = 7.7 MGD
Non-revenue
water
6%
Single Family
Residential
35%
Irrigation
5%
Non-
residential
12%
Figure 2-6
City of Bremerton
1999 - 2004 Average '''''ater Use by Location
ADD = 7.7 MGD
Port Orchard
1%
Non-revenue
Water
6%
Figure 2-7
Planning Background Information
2-15
2005 City of Bremerton Water System Plan
Navy properties include the Puget Sound Naval Shipyard and Intermediate Maintenance Facility
(PSNS&IMF) and Naval Station Bremerton, Jackson Park Housing complex, the Navy Hospital,
and several other smaller accounts. The largest demand in the entire system is PSNS&IMF,
which has an average water demand from 1999 to 2004 of 2 MGD, as shown in Figure 2-8.
Navy properties account for about one-third of Bremerton's water demands. Historically, the
Navy has had a significant effect on Bremerton's water system. It was due to increases in
workload at PSNS and the resulting increase in Bremerton's population that water demands
skyrocketed during World War II. This effect stands out when over 70 years of water production
is presented, as shown in Figure 2-4.
Within the PSNS&IMF the water uses are industrial/commercial (64%), shipboard (18%), steam
production (13%), and residential (5%). The Navy is performing two studies concerning water
conservation. First, a leak detection survey was completed indicating little water is lost through
leaks (approximately 2%). Second, a water conservation study with the goal of identifying
existing water uses and potential conservation projects within the PSNS&IMF is in progress. The
Navy expects its water demands to decrease over the next five to six years and then to stabilize
over the long range.
Puget Sound Naval Shipyard Water Use 1975-2004
3.5
>.
~ 3.0
~ 2.5
Cl..
~ 2.0-
o
iii 1.5
C>
g 1.0
:E 0.5
0.0
1975 1978 1981 1984 1987 1990 1993 1996 1999 2002
Figure 2-8
2.4.1 Maximum Day Demands
Maximum day demand (MDD) is defined as the highest amount of water used in a single
day in the calendar year. For Bremerton, these data are estimated using source production
meters.
Table 2-3 and Figure 2-9 present historical ADD andMDD. The ratio of MDD to ADD
for the past six years ranges from 1.65 to 1.96, which is in the expected range for
Washington water systems. This excludes the drought year of2001, which had a ratio of
1.53. The City implemented conservation outreach that summer, focusing on reduced
outdoor water use. The result was a 17 percent reduction in MDD.
Planning Background Information
2-16
2005 City of Bremerton Water System Plan
MDDs generally occur during summer warm, dry spells when outdoor water use is
highest; however, MDDs can also occur in the winter when customers let their taps drip
during freezing weather, PSNS activates its freeze protection system, and line breaks are
common. The highest MDD recorded for Bremerton in the past 25 years was 20 MGD,
which occurred on December 22, 1990 during a severe cold spell.
Forecasted MDDs are shown in Table 2-4 and Figure 2-9 and were calculated using a
MDD peaking factor of 2.0 as recommended by the Washington State Water System
Design Manual. This figure also shows the effect of further implementation of
Bremerton's conservation program in compliance with upcoming state efficiency
regulations.
Planning Background Information
2-17
2005 City of Bremerton Water System Plan
Single-family Multi.family Commercial Irrigation Navy Contracts Non-revenue Water Rocky Average Max Day Average Max Day
Residential Residential Point City of Day Demand Day Demllnd
Water Port Demand Without Demand With
Year With Without With Without With Without With Without With Without With Without Orchard Without With
Conser- Conser. Conser- Conser- Conser- Conser- Conser. Conser- Conser- Conser- Conser- Conser- District Contract Conser- Conser- Conser- Conser-
vation vation vation vation vation vation vation vation vation vation vation vation Contract vation vation vation vation
2005 2.77 2.80 0.74 0.74 1.13 1.13 0.32 0.32 2.23 2.28 0.44 0.45 0.13 0.05 7.91 15.82 7.81 15.63
2006 2.85 2.88 0:76 0.76 1.16 1.17 0.33 0.33 2.19 2.28 0.45 0.46 0.14 0.10 8.12 16.24 7.98 15.95
2007 2.92 2.96 0;77 0.78 1.21 1.22 0.34 0.34 2.14 2.29 0.47 0.48 0.14 0.25 8.47 16.93 8.24 16.48
2008 2.98 3.04 079 0.80 1.25 1.26 0.35 0.35 2.10 2.30 0.47 0.49 0.14 0.25 8.63 17.27 8.34 16.67
2009 3.04 3.12 0.81 0.82 1.29 1.31 0.36 0.36 2.05 2.31 0.48 0.50 0.14 0.25 8.81 17.62 8.42 16.85
2010 3.10 3.20 0:81 0.84 1.33 1.35 0.36 0.37 2.06 2.31 0.48 0.51 0.15 0.25 8.98 17.96 8.54 17.08
2011 3.15 3.27 0.84 0.86 1.37 1.39 0.37 0.38 2.06 2.32 0.49 0.52 0.15 0.25 9.15 18.29 8.69 17.37
2012 3.22 3.35 0;86 0.88 1045 1.48 0.38 0.39 2.07 2.33 0.50 0.53 0.15 0.25 9.37 18.73 8.89 17.77
2013 3.27 3.43 0:88 0.90 1.53 '1.57 0.39 0.40 2.08 2.34 0.51 0.54 0.15 0.25 9.59 19.17 9.07 i8. i3
2014 3.33 3.51 0.90 0.93 1.61 1.66 0.40 0.41 2.08 2.34 0.52 0.56 0.16 0.25 9.81 19.62 9.25 18.51
2015 3.40 3.58 0:92 0.95 1.70 1.75 0.41 0.42 2.09 2.35 0.54 0.57 0.16 0.25 10.03 20.06 9.47 18.94
2016 3.48 3.66 0.94 0.97 1.73 1.83 0.42 0.42 2.10 2.36 0.54 0.58 0.16 0.25 10.24 20.47 9.62 19.23
2017 3.55 3.74 0:96 0.99 1.85 1.90 0.43 0.43 2.10 2.37 0.56 0.59 0.16 0.25 10.44 20.87 9.87 19.73
2018 3.62 3.82 0.98 1.01 1.94 1.99 0.43 0.44 2.11 2.37 0.57 0.60 0.17 0.25 10.66 21.31 10.08 20.16
2019 3.70 3.89 1.00 1.03 2.01 2.07 0.44 0.45 2.12 2.38 0.58 0.61 0.17 0.25 10.86 21.73 10.27 20.54
2020 3.77 3.97 1.02 1.05 2.09 2.15 0.45 0.46 2.12 2.39 0.59 0.63 0.17 0.25 11.07 22.15 10.47 20.95
2021 3.84 4.05 1.04 1.07 2.18 2.24 0.46 0.47 2.13 2.40 0.61 0.64 0.17 0.25 11.29 22.59 10.69 21.-'8
2022 3.92 4.12 1.06 1.09 2.25 2.31 0.47 0.48 2.14 2.40 0.62 0.65 0.18 0.25 11.49 22.98 10.88 21.76
2023 3.99 4.20 1.08 1.11 2.34 2.40 0.48 0.49 2.14 2.41 0.63 0.66 0.18 0.25 11.71 23.42 11.09 22.19
2024 4.06 4.27 1.10 1.13 2.42 2.48 0.49 0.50 2.15 2.42 0.64 0.67 0.18 0.25 11.91 23.83 11.29 22.58
Table 2-4
City of Bremerton Main System and Contracted Water Sales
Historical (shaded) and Forecasted Water Use by Type of Use in MGD
Assumptions:
I. Single Family water use will increase at the same rate as population growth. New homes will be built with water efficient plumbing according to the federal Energy Efficiency Act.
2. Multi-family \vater use will increase at the same rate as population grO\vth. New units will be built with water efficient plumbing according to the federal Energy Efficiency Act.
3. Commercial water use will increase at the same rate as population gro\\1h. Additionally. the West Hills industrial area is anticipated to begin in 2007.
and the Kitsap Lake industrial area is anticipated to begin in 2012.
lnigation use will increase at the same rate as population growth.
Na'\y industl;al use will decrease with implementation of conservation programs. Navy residential use will increase slightly with population.
Ro-cky Point water use will increase at the same rate as population growth for that area.
City of Port Orchard waler use will increase to the maximum amount allowed in the interlocal agreement.
Non-revenue Water assumed to be 6 percent of total customer water sales.
4.
5.
6.
7.
8.
9.
10.
Forecasted Maximum Day Demand is forecasted Average Day Demand multiplied by 2.
Assumptions used to calculate demands under the "with conservation" scenario are described in Section 2.5.2.
2-18
Planning Background Information
2005 City of Bremerton Water System Plan
Table 2-5
City of Bremerton Main System
Historical (shaded) and Proiected Water Use by Type of Use in ERU with conservation
All Units are in Equivalent Residential Units
Rocky City of Total
Single- Multi- Non Point
Navy Port Average
Year family family Commercial Irrigation Contracts Revenue Water Orchard Day
Residential Residential Water District
Contract Contract Demand
4~
2005 13,850 3,700 5,650 1,600 11,386 2,212 663 250 39,075
2006 14,250 3,800 5,800 1,650 11,423 2,258 676 500 39,884
2007 14,600 3,850 6,050 1,700 11,459 2,332 690 1,270 41,191
2008 14,900 3,950 6,250 1,750 11,496 2,359 703 1,270 41,682
2009 15,200 4,050 6,450 1,800 11,533 2,384 716 1,270 42;120
2010 15,500 4,050 6,650 1,800 11,570 2,417 729 1,270 42,699
2011 15,750 4,200 6,850 1,850 11,607 2,459 742 1,270 43,437
2012 16,100 4,300 7,250 1,896 11,644 2,515 755 1,270 44,435
2013 16,350 4,400 7,650 1,943 11,681 2,566 768 1,270 45,328
2014 16,650 4,499 8,050 1,989 11,718 2,619 782 1,270 46,274
2015 '17,018 4,599 8,500 2,035 11,756 2,680 795 1,270 47,345
2016 17,386 4,698 8,640 2,081 11,794 2,722 808 1,270 48,086
2017 17,753 4,797 9,250 2,128 11,831 2,792 821 1,270 49,326
2018 18,120 4,896 9,700 2,174 11,869 2,853 834 1,270 50,395
2019 18,486 4,995 10,050 2,220 11,907 2,907 847 1,270 51,358
2020 18,852 5,094 10,450 2,267 11,945 2,965 860 1,270 52,374
2021 19,218 5,193 10,900 2,313 11,984 3,025 873 1,270 53,442
2022 19,583 5,292 11,250 2,359 12,022 3,079 886 1,270 54,404
2023 19,949 5,390 11,700 2,405 12,060 3,140 899 1,270 55,472
2024 20,296 5,484 12,100 2,449 12,099 3,196 912 ],270 56,460
Planning Background Information
2-19
2005 City of Bremerton Water System Plan
Table 2-6
West 517 Zone Historical (shaded) and Projected Water ADD in MGD
Water Use Within West 517 Zone System Water to Other Systems
South Kitsap Aero Mobile Total West Total ERUs
Year Commercial Golf Course Industrial Total Intertie to Estates 517 Zone West 517 Zone
Irrigation Area Main System (Master
Meter)
2005 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990
2006 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990
2007 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990
2008 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990
2009 0.035 0.200 0.000 0.235 0.150 0.013 0.398 1,990
2010 0.D75 0.200 0.090 0.365 . 0.150 0.013 0.528 2,640
2011 0.090 0.200 0.180 0.470 0.150 0.013 0.633 3,165
2012 0.105 0.200 0.270 0.575 0.150 0.013 0.738 3,690
2013 0.120 0.200 0.360 0.680 0.150 0.013 0.843 4,215
2014 0.135 0.200 0.450 0.785 0.150 0.013 0.948 4,740
2015 0.150 0.200 0.540 0.890 0.150 0.013 1.053 5,265
2016 0.165 0.200 0.630 0.995 0.150 0.013 1.158 5,790
2017 0.180 0.200 0.720 1.100 0.150 0.013 1.263 6,315
2018 0.195 0.200 0.810 1.205 0.150 0.013 1.368 6,840
2019 0.210 0.200 0.900 1.310 0.150 0.013 1.473 7,365
2020 0.225 0.200 1. 000 1.425 0.150 0.013 1.588 7,940
202] 0.240 0.200 1.100 1.540 0.150 0.013 1.703 8,515
2022 0.255 0.200 1.200 1.655 0.150 0.013 1.818 9,090
2023 0.270 0.200 1.300 1.770 0.150 0.013 1.933 9,665
2024 0.285 0.200 1.400 1.885 . 0.150 0.013 2.048 10,240
Assumptions:
1. Commercial use in the West 517 Zone is assumed to increase through the McCormick project and NASCAR.
2. Golf course irrigation will stay the same on average. Values are total use averaged over the year.
3. SKIA will grow according to the estimate provided in the 1999 Subarea Plan between 20 I 0 and 2024.
4. Intertie to the Main System varies depending on needs; value used is the average from 1999 to 2004.
5: Aero. Mobile Estates is at .build out; value used is the average from 1999 to 2004.
6. ERU calculated using value from the Bremerton Main System: 200 gallons per day per ERU for
ADD.
7. More water than usual was supplied through the intertie in 2003/04 due to drier than normal weather.
Planning Background lnfonnation
2-20
2005 City of Bremerton Water System Plan
City of Bremerton Historical Water Use and Demand Forecast
25
o
>>
ns
o
...
<1l 15
Q.
tIl
C
.2
ns
C)
~ 10
:E
1999
2001
2003
2005
2007
2009
2011
2013
2015
2017
2019
2021
2023
--+- Average Day Demand Without Conservation
-/I- Average Day Demand With Conservation
-+- Maximum Day Demand Without Conservation
--.- Maximum Day Demand With Conservation
Figure 2-9
City of Bremerton West 517 Zone Water Use Forecast
Average Day Demands
3
2
>.
co
Cl
...
CIl
a.
III
c:
.2
IV
C)
c:
.2
~
o
1399
2001 2003 2005 2007 2009
2011
2013
2015
2017
2019
2021 2023
Figure 2-10
Planning Background Information
2-21
2005 City of Bremerton Water System Plan
2.4.2 Non-revenue Water
Non-revenue water is defined as the difference between metered source water and
metered water sales. Non-revenue water can include authorized uses such as water main
flushing, fire fighting, and hydrant flow testing or unauthorized uses such as leaks and
theft. Generally, systems having less than 10 percent non-revenue water are being
maintained properly. Since 1999, Bremerton's non-revenue water has averaged 5.7
percent of metered production, as shown in Figure 2-11, which indicates that water loss is
within acceptable levels.
City of Bremerton Public Works and Utilities
Non-revenue Water
(Water Production vs. Consumption)
10%
9%
8%
7%
6%
5%
4%
3%
2%
1%
0%
.----
--
- - --
-- .. ---
. . .
- -.. - . ...
. . - - -.. - . - - ...
... - - --
-
- I----
- -~ -
-- I----
: :
9.5
9.0
8.5
8.0
7.5 M
G
7.0 D
6.5
6.0
5.5
5.0
1999
2000
2001
2002
2003
2004
c==J % DIFFERENCE
- PRODUCTION (MGD)
- ,. - CONSUMPTION (MGD)
Figure 2-11
2.4.3 Equivalent Residential Units
An Equivalent Residential Unit (ERU) is defined as the amount of water consumed by a
typical full-time, single-family residence. An ERU is a unit of measure to equate non-
residential or multi-family residential water usage to a specific number of single-family
residences. When ca1culatingERUs, only active accounts are considered. The amount of
water associated with an ERU is system specific. The ERU for one system will differ
from another based on demographics or water _ use patterns. An ERU for a particular
system can also change with time associated with changing water use patterns (such as a
lowering of ERU with conservation). Historical and projected water use in ERUs is
presented in Table 2~5. The ERUs forBremerton's system are presented in Table 2-7.
Planning Background Information
2-22
2005 City of Bremerton Water System Plan
Table 2-7
ERU Calculation for the Bremerton Water Service Area
Year ERU
Gallons per day per single-family residence
1999 190
2000 187
2001 171 (drought plan implemented)
2002 179
2003 189
2004 184
Average 183
Use for Analysis 200
For analysis in this WSP, Bremerton will be using 200 gallons per ERU for ADD. This
value is on the low end of the range for water systems in Washington but reflects several
characteristics of Bremerton's system: including small lot size within the city limits, a
much higher percentage of rentals (60%) than the national average (40%), the fact that
one-half of Bremerton's residents are classified as low income, relatively high sewer
rates, and Bremerton's water conservation program.
2.4.4 Commercial/Industrial Demands
The Bremerton water supply area consists of approximately 1,400 commercial water
accounts, including commercial, government, and industrial entities. Other than activities
inside PSNS, the City has no large industrial users. The majority of businesses in the
water supply area consist of office-based businesses, restaurants, medical facilities,
automotive shops, and services (dry cleaners, beauty shops, etc.). The largest non-
residential water users are identified in Tables 2-8 and 2-9.
Sections 2.1.1 and 2.1.2 identify areas within the Bremerton water service area that are
anticipated to experience commercia1lindustrial development. These areas are also
described in Table 2-10.
2.5 Water Forecasts
As the population grows and commercial/industrial development occurs, demands on the water
system will increase accordingly. Water systems are required by DOH to prepare two forecasts:
one forecast without conservation and one forecast showing the expected reduction from
implementation of a conservation program. In 2003, the Washington State Legislature passedthe
Municipal Water Supply- Water Use Efficiency Requirements Act. The Department of Health is
expected to adopt water use efficiency regulations in 2006. These regulations will require water
systems to prepare Water Use Efficiency Plans (WUEP). Bremerton's conservation program is
described in Section 3.
Planning Background Information
2-23
2005 City of Bremerton Water System Plan
Table 2-8
Citv of Bremerton Main Water System
Customer Facility Type Number of Pressure MGY MGD ERUs2
Meters Zone 2004 2004
City of Bremerton Wastewater Treatment Plants and Lift Wastewater 28 Various 84.40 0.231 1,153
Stations
Harrison Memorial Hospital Hospital 6 E240 42.56 0.116 581
Central Kitsap School District Public School 9 E398 9.57 0.026 131
Kitsap County Fair and Parks Department Fairgrounds II E398 6.85 0.019 94
Bremerton School District Public School 17 Various 6.58 0.018 90
Bremerton Convalescent Center Residential Care I E240 5.61 0.015 77
Belmont Terrace Residential Care I E240 4.57 0.012 62
Best Western Bremerton Inn Hotel 6 W256 4.43 0.012 61
Olympic College College 15 W256 423 0.012 58
Forest Ridge Convalescent Center Residential Care I W440 4.22 0.012 58
Claremont East Retirement Center Residential Care I E240 4.09 0.01 I 56
Bremerton Hotel Hotel I W256 3.45 0.009 47
Washington State Ferries Ferry I W256 3.40 0.009 46
Frances Haddon Morgan Center Residential Care 5 W256 3.32 0.009 45
Albertsons Grocery 2 E240 2.72 0.007 37
Seven 1's Industrial 2 W256 2.70 0.007 34
Olympic Peninsula Kidney Center Medical I E240 2.51 0.007 34
Evergreen at Bremerton LLC Residential Care I W256 2.51 0.007 34
Super 8 Motel I W256 2.37 0.007 34
Safeway Groc I W256 2.10 0.006 30
Seasonal
Customer Facility Type Number of Pressure MGY Use ERUs2
Meters Zone 2004 MGD
20043
City of Bremerton Parks Department Parks 39 Various 27.62 0.226 1,130
Bremerton Schoo I District School 16 Various 20.90 0.1 71 857
Woodlawn Cemetery Cemetery 3 W440 5.95 0.049 245
Kitsap County Fair and Parks Department Parks 4 E398 4.21 0.035 173
..
Olympic College School 16 W256 3.18 0.026 131
Central Kitsap School District School 2 E398 2.97 0.024 122
Forest Lawn Cemetery Cemetery 2 W256 2.91 0.024 119
Canterbury Manor Residential Care I E398 1.89 0.016 78
Kitsap Housing Authority Housing 2 W256 1.61 0.013 66
Port Orchard Sand and Gravel Gravel I W440 1.59 0.013 65
Notes:
I. Does not include other water systems such as PSNS, Jackson Park, or Rocky Point
2. One ERU in Bremerton is equal to 200 gallons per day ADD
3. Seasonal Use equals MGD during the irrigation season
Planning Background Information
2-24
2005 City of Bremerton Water System Plan
Table 2-9
Bremerton West 517 Zone System
~5'LlUfGEST~N1)N'fRESIDENii:~N9rit~1RRI6Wfi0NtWAtERt.USERSjt\}J.~:\~j}~~i~~~~~:,~f~'i;i~t'JJ!~~1\~~~~:!i~H'E~j~ii\;{ii~:i~['~1~1,'i.~i~~
Customer Facility Type Number MG/yr MGD ERUs!
of Meters 2004 2004
Fred Hill Materials Cement 3 10,20 0,028 140
Port of Bremerton Ai rport 10 1,28 0,003 17
Safe Boats International LLC Man u facturin 0,91 0,002 12
Coastal Marine Service Inc Service/Repair 0,20 0,001 3
Morrison Gravel Storage 0,15 <0,001 2
I, One ERU equals 200 gallons per day ADD
ProposedLar
Table 2-10
e Commercial/lndustri~d Development in the Bremerton Water Service Area
Projected Water Use
Average Day Demand
ADD!
Proposed
Use
Total
Developable
Acreage
Zone
Estimated ERUs at
Buildour
Development
Name
Owner
Kitsap Lake Port Blakely Industrial and 300 W650 0 0,154 0598 2,990
Industrial Park commercial
West Hills Pope Resources Industrial 60 W650 0 0,080 0,155 775
Industrial Area
Port of Bremerton, Manufacturing,
South Kitsap McCormick Land Wholesale, 547 W517 0 0.450 1,413 7,065
Industrial Area Company, and Retail, Services
others
McCormick Land McCormick Land Commercial 80 W517 0 0.080 0.232 1,160
Com an Com an
International
NASCAR Track3 Speedway Commercial 950 W517 0 0.025 0.025 125
Co oration
I. Projected water use was estimated from data provided in the projects' sub-area plan.
2. An Equivalent Residential Unit (ERU) ~ 200 gallons/day ADD for Bremerton's system
3. NASCAR development as of 12/06 is extremely preliminary. Water use is estimated to be 1,500gpm peak domestic only 3 days per year with occasional lower
demands the rest of the year and 3.000 gpm for 3 hours fire flow. Additional storage not currently identified in the CIP would be required for the track.
2.5.1 Forecast withoutConservation
Average day system demands were forecasted in Tables 2-4, 2-5 and 2-6, assuming a
continuation of the existing residential per capita demand and using projections provided
by PSNS and for planned commerciallindustrial development. Annual average demand
projections were based on the following:
Planning Background Information
2-25
2005 City of Bremerton Water System Plan
. Residential demands for single-family housing were calculated by increasing the 2004
single-family residential demand of 2.63 MGD by the same percentage as the
projected population increases. Additional demands were reduced by 5 percent to
account for implementation of federally-mandated, reduced flow plumbing fixtures in
new construction.
. Multi-family units forecasted demands were calculated the same way as single-family
units.
. Non-residential demands for commerciallindustrial development were increased by
the same percent as the forecasted population growth. The increased demands of
proposed large developments identified in Table 2-10 were added to the forecasted
commerciallindustrial demands beginning in the years they are anticipated to be built.
. Irrigation demands were calculated to increase at the same rate as population growth.
. Without conservation, Navy industrial use would remain constant, and residential use
would increase with population increases.
. Non-revenue water was assumed to stay stable at the current 6-year average of 6
percent.
. Rocky Point Water District demands are expected to increase with the forecasted
increase in the population for that area.
. City of Port Orchard is forecasted to use the maximum amount of water allowed in
the interlocal agreement.
2.5.2 Forecast with Conservation
Bremerton has emphasized water conservation since 1992. In the 1999 WSP, the City
anticipated making the conservation achievements shown in Table 2-11 between 1999
and 2004.
A separate "with conservation" average day demand forecast is included in Table 2-4 and
was calculated taking projected conservation reductions into account as follows:
. Single-family residential - Reach 5 percent of our accounts (approximately 700
units) each year for the next 10 years and they reduce by an additional 10 percent.
This includes reductions in both indoor and outdoor use.
e Multi-family residential -:- Reach 5 percent of the units (approximately 300 units)
each year for the next 10 years and they reduce water use by 5 percent. Opportunities
for water use reduction are more limited with multi-family dwellers.
. Commercial- Reach 5 percent of accounts (approximately 130 units) each year and
they reduce water use by 5 percent This includes only indoor use.
e Irrigation - Reach 5 percent of the irrigation accounts (approximately 10 accounts)
each year and they reduce use by 5 percent. In 2012 begin using reclaimed water at
Pendergast Park.
Planning Background Information
2-26
2005 City of Bremerton Water System Plan
Table 2-11
Water Conservation Goals and Achievements 1999 - 2004
Customer Conservation Projected Actual
Class Goal Indoor Outdoor Demand Demand Explanation
Reduction Reduction
Bremerton's
conservation program
Influence 5% of Savings of Use focus is primarily on
Single- accounts 80,000 gpd reduced by this customer class,
family ( approximately v' v' for an ADD 90,000 gpd resulting in an
homes 700 units) each of2.64 for an expected response.
year to reduce MGD ADD of There was also a
water use 10% 2.63 MGD 4.2% reduction in
population during this
time.
Influence 5% of Savings of Use The 4.2% reduction
the units 12,000 gpd reduced by in population would
Multi- (approximately v' for an ADD 110,000 have affected this
family 300 units) each of 0.79 gpd for an customer class the
year to reduce . ADD of
water use by 5% MGD 0.69 MGD most.
Influence 5% of Savings of Use The number of
the accounts increased commercial accounts
( approximately 12,000 gpd by 290,000 has increased, and the
Commercial v' for an ADD
130 units) each of 0.76 gpd for an WWTP has used
year to reduce MGD ADD of more water for its
water use by 5% 1.06 MGD odor control system.
During the 2001
Influence 5% of Use drought, a major
the irrigation Savings of reduced by focus was on
accounts 6,500 gpd 140,000 reducing irrigation,
Irrigation (approximately 10 v' for an ADD resulting in
accounts) each of 0.43 gpd for an operational changes,
ADD of
year to reduce use MGD 0.30 MGD especially with the
by5% City Golf Course and
Parks.
Use
Reduce total water Savings of reduced by Although asked, the
Navy use by 10% from v' v' 100,000 gpd 430,000 Navy does not have
1999 - 2019 for an ADD gpd for an an explanation for the
of2.6 MGD ADD of decreased use.
2.27 MGD
. Navy - The Navy expects its industrial demands to decrease over the next few years
with the implementation of its conservation program, then to remain stable for the
remainder of the planning period. Jackson Park Housing is near built-out, but a small
percentage of growth was assumed.
. Conservation reductions - No conservation reductions are projected for Rocky Point
or City of Port Orchard uses.
Planning Background Information
2-27
2005 City of Bremerton Water System Plan
. Conservation behavior - After 2015, focus conservation efforts on preserving the
conservation behavior of 80 percent of the accounts previously reached. This
approach assumes that some customers will be resistant to conservation actions.
2.6 References
City of Bremerton Comprehensive Plan. City of Bremerton Department of Community
Development. 2004.
DOH Water System Planning Handbook. Washington State Department of Health. 1997.
Kitsap County Comprehensive Plan. Kitsap County. 1998.
Puget Sound Naval Shipyard. Personal Communication with Mark Bennett. August 2005.
The Growth Management Act (GMA, State of Washington. Revised Code of Washington, 1990,
as amended. 1999.
The Growth Management Act. Washington StateCTED. Washington State Community, Trade
and Economic Development, Growth Management Division. Undated.
Washington Water System Design Manual. Washington Department of Health. 2001.
Planning Background Information
2-28
2005 City of Bremerton Water Supply Plan
Section 3
Sources of Supply
3.1 Introduction
The purpose of this section is to ensure that several options for water sources are considered to
meet projected demands. These options include:
· Optimization of existing sources,
· Enhanced conservation measures,
· Water right changes,
· Interties,
· Aquifer Storage and Recovery (ASR),
· Use of reclaimed, non-potable water,
· Treatment, where applicable, to permit use of water sources requiring more comprehensive
treatment to meet current water quality regulations, and
· Applications for new sources.
3.2 Water Sources
Surface water and groundwater production is presented in Table 2-3 for the period 1985 to 2004.
Surface water is obtained from the Union River system, while groundwater is drawn from local
production wells. Average contributions from surface water and groundwater over the last 20
years are 1,776 and 1,200 million gallons per year or a distribution of 60 percent and 40 percent,
respectively.
Substantial increases in groundwater production occurred in 1992 and 1993, and in 2001 through
2004 due to decreased surface water availability and drought conditions. Table 2-3 also indicates
a falling trend in total production since 2001 when the Water Shortage Contingency Plan was
activated in response to that year's drought.
Note that 1994 through 1999 had significantly higher than average precipitation, which can cause
lower demands from reduced outdoor use. Maximum Day Demand, which reached its highest
levels from 1988 to 1991, has reduced since and stabilized to about 15 MOD.
3.2.1 Surface Water Sources
The Union River surface water annual firm yield estimate is 2,020 million gallons, which
includes an estimate of the West Branch contribution at 250 million gallons and
minimum downstream flows. This firm yield estimate is close to current average City
surface water usage but less than actual average total diversions, which include diversions
Sources of Supply
3-1
2005 City of Bremerton Water Supply Plan
to Twin Lakes. This diversion is used to recharge the Twin Lakes Aquifer and has
averaged approximately 350 million gallons per year. The firm yield analysis indicates
that reliable surface water contributions to the City's water supply system are close to
being maximized under the existing production procedures.
3.2.2 Groundwater Sources
Groundwater supplies are obtained from 13 active production wells in the Garst Creek
Basin, Anderson Creek Basin, and the Manette Peninsula. These wells are described in
Tables 3-1and 3-2 and in the Kitsap County Initial Basin Assessment.
Several studies on the City's groundwater systems have been conducted and are described
below.
Kitsap County Groundwater Management Plan (GWMP) - The GWMP was prepared
in accordance with Chapter 173-1 00 WAC, Groundwater Management Areas and
Programs, which led to designating Kitsap County as a Groundwater Management Area
(GWMA) in October 1986. An Interlocal Agreement between the Kitsap Public Utility
District and the Kitsap County Board of Commissioners in December 1986 established
both entities as co-lead agencies for the evaluation and preparation of the GWMP. The
GWMP document is presented in four volumes. Volume I is an assembly and analysis of
groundwater related data and includes estimates of groundwater availability, use, and
projected demand.
Volume II provides technical supporting data and additional information developed for
each of the study's five individual subareas. Volume III covers a variety of management
issues and policies deemed appropriate by the Groundwater Advisory Committee to
provide a comprehensive management strategy for groundwater resources throughout
Kitsap County. Volume IV provides supporting and additional information, including the
Kitsap County Initial Basin Assessment and issue papers developed in the process.
Sources of Supply
3-2
2005 City of Bremerton Water Supply Plan
Table 3-1
Groundwater Sources of Supply
Groundwater Sources for the Bremerton Main System #08200R
DOH Current
Well Source Year Qi Capacity function
# # Aquifer Drilled gpm gpm
Anderson Creek Shallow Provides water to Anderson
IR Fu lure Artesian Aquifer 2005 NA NA Creek Pump Station (PS2)
Depth = 273' serving the West 256, West
580, and East 240 Zones.
2R S07 Anderson Creek Shallow Provides water to Anderson
Artesian Aquifer 1989 1200 800 Creek Pump Station (PS2)
Depth = 273' serving the West 256, West
580, and East 240 Zones.
3 S08 Anderson Creek Shallow Provides water to Anderson
Artesian Aquifer 1943 1200 450 Creek Pump Station (PS2)
Depth = 316' serving the West 256, West
580, and East 240 Zones.
6R future Anderson Creek Deep Provides water to Anderson
Artesian Aquifer 2005 2000 NA Creek Pump Station (PS2)
Depth = 645' serving the West 256, West
580, and East 240 Zones.
7 SI2 Anderson Creek Deep Provides water to Anderson
Artesian Aquifer 1945 450 340 Creek Pump Station (PS2)
Depth = 627' serving the West 256, West
580, and East 240 Zones.
8 S13 Anderson Creek Deep Provides water to Anderson
Artesian Aquifer 1980 600 620 Creek Pump Station (PS2)
Depth = 578' serving the West 256, West
580, and East 240 Zones.
9 SI6 Parkwood East Aquifer 1977 280 270 Provides water directly to
Depth = 947' the East 398 Zone.
13 SI4 Manette Sea Level Provides water directly to
Aquifer 1979 680 530 Reservoirs 17 & 20 in the
Depth = 273' East 398 Zone.
14 S15 Manette Sea Level Provides water to the East
Aquifer 1980 500 180 240 Zone and Pump
Depth = 278' Station 16.
17 SI7 Twin Lakes Aquifer 1982 650 730 Pumps into the McKenna
Depth ~ 296' falls transmission main.
20 S22 Twin Lakes Aquifer 1990 1150 1150 Pumps into the McKenna
Depth = 260' Falls transmission main.
21 NA MeadowdaleAquifer Will pump into the East 398
Depth = 380' 1989 NA Est 500 Pressure Zone
22 future Gorst Valley Aquifer 1993 NA Est 400 Will pump into the West
Depth = 157' 256 Pressure Zone
Sources of Supply
3-3
2005 City of Bremerton Water Supply Plan
Table 3-2
Groundwater Sources for the Bremerton West 517 Zone System #082734
DOH Current
Well Source Year Qi Capacity Function
# # Aquifer Drilled gpm gpm
15 S20 Twin Lakes Aquifer 1981 300 210 Provides water to the West
f)pnth = ')0.1' 1\ 1'7 7 "npo <;:'"ctpm
....,......t-'~u -, . "'" ~ , a.....'-'u~ .......J....~.....U&
]6 NA I Gorst Sea Level Aquifer 1981 125 140 Irrigation only to Cascade
Depth = 400' Course
18R S19 Twin Lakes Aquifer 2002 600 380 Provides water to the West
Depth = 270' 517 Zone System
19 S21 Twin Lakes Aquifer ]988 300 260 Provides water to the West
Depth = 183' 517 Zone System
Wellhead Protection Plan - The Washington Department of Health adopted a Wellhead
Protection Program in July 1994 requiring all suppliers of public drinking water to
implement a wellhead protection plan. Each drinking water purveyor must define that
portion of the aquifer providing groundwater to a production well. The overlying land is
designated into 1-, 5-, and 10-year time-of-travel wellhead protection areas. Within these
protection areas, a land use inventory must be conducted every two years to identify
activities with the potential to contaminate groundwater, and the sites within the
protection areas are notified and sent pollution prevention materials. The City's most
recent update to the Wellhead Protection Plan was in 1996 and was previously submitted
to DOH.
Corst Creek Basin Study - An analysis of the Gorst Creek Basin groundwater supplies
was conducted in 1996 describing basin hydrogeology and hydrology, developing a
computer model, and evaluating various management strategies. Conclusions from this
study included:
The Gorst Creek Instream Flow Requirements (IFR) were set too high, since the
existing IFR could not be met under natural conditions.
Significant quantities of groundwater were discharging to Sinclair Inlet from the
Lower Garst Valley and were considered to be a potential resource without hydraulic
continuity constraints.
Most of the water diverted to Twin Lakes is lost to seepage to the Union River and
Garst Creek and partially captured by Wells 18 and 20.
Anderson Creek Well Field Evaluation ..:...An aquifer test was performed to confirm
safe yield and to maximize existing inactive wells through a replacement program in this
area.
Sources of Supply
3-4
2005 City of Bremerton Water Supply Plan
3.3 Enhanced Conservation Measures
Water demand management through efficiency and conservation can be a cost-effective tool for
meeting water needs for population growth while saving the Utility capital costs and improving
customer relations. The City has placed an increasing emphasis on water conservation efforts
since 1992. Evaluation of water use by equivalent residential unit (Table 2-7) indicates a steady
reduction in water use since 1999. Total water use has remained steady for the past 10 years.
Customers responded enthusiastically to the 2001 drought conservation message and reduced
water use that summer by 18 percent, well in excess of the 10 percent voluntary reduction the
City requested.
Non-revenue water is defined as the difference between metered source water and metered water
sales. Non-revenue water can be authorized uses such as for flushing, fire fighting, and hydrant
flow testing or unauthorized uses such as leaks and theft. Generally, systems having less than 10
percent non-revenue water are being maintained properly. Since 1999, Bremerton's non-revenue
water has averaged 5.7 percent, which indicates that water loss is not a problem (Figure 2-10).
Bremerton has implemented enhanced conservation measures, defined as measures above and
beyond those required for a medium-sized water system. In accordance with the recommended
water conservation program contained in the DOH 1994 publication, "Conservation Planning
Requirements," the City is required to implement the measures for a medium system. Table 3-3
identifies the measures required for medium systems, as well as those implemented by the City.
Recommended DOH (1994) Water Conservation Program for Public Water Systems
Recommended Recommended lmplemented by
Conservation Measures for Medium Systems for Large Systems Bremerton
A. Public Education ,/ ,/
I. School Outreach ,/ ,/
2. Speakers Bureau ,/ ,/
3. Program Promotion ,/ ,/ ,/
4. Theme Shows and Fairs
B. Technical Assistance ,/ ,/ ,/
I. Purveyor Assistance ,/ ,/ ,/
2. Customer Assistance ,/ ,/
3. Technical Studies
4. Bill Showing Consumption History ,/ ,/ ,/
C. System Measures ,/ ,/ ,/
I. Source Meters ,/ ,/ ,/
2. Service Meters
3. Unaccounted Water/Leak Detection ,/ ,/ ,/
D. Incentives/Other Measures ,/ ,/
I. Single-family/Multi-family Kits ,/
,/ N/A
2. Nurseries! A-griculture ,/
,/ ,/
3. Landscape Management! PlayfieJds/ ,/
Xeriscaping ,/ ,/
4. Conservation Pricing ,/
5. Utility Financed Retrofit ,/
6. Seasonal Demand Management ,/ ,/
7. Recycling/Reuse ,/ ,/
Table 3-3
Bremerton Conservation Practices
Sources of Supply
3-5
2005 City of Bremerton Water Supply Plan
Table 3-3 shows that despite classification as a "medium" system, the City has implemented
most of the requirements of a large system. In addition to these measures, demand has been
reduced by the 1992 Energy Policy Act, which requires efficient plumbing features in new
construction. These indoor water-efficient devices, such as low flow toilets, faucets, and
showerheads, save an estimated 35 percent of indoor water use (Vickers, 2001). The overall
effectiveness of all these measures is confirmed by trends already noted in Table 2-11.
In 2003, the Washington State Legislature passed the Municipal Water Supply - Water Use
Efficiency Requirements Act. The Department of Health is expected to adopt water use
efficiency regulations in 2006. Under the new regulations, the City of Bremerton will be required
to implement the measures for a large system (over 10,000 connections) and prepare Water Use
Efficiency Plans (\VUEP). The WUEP for the City of Bremerton is currently "interim" to
meeting the requirements of the 2005 Water System Plan schedule and contains many elements
of the new regulation but cannot be completed until the requirements of the new regulations are
finalized.
The City of Bremerton values the continued high quality and usually ample supply of its water-
resources. Customer education about water quantity and quality creates awareness, which can
result in improved water use habits. Water use efficiency can be viewed as a resource, an
alternative to developing new water supplies to meet new water demands. The current objectives
of the City of Bremerton WUEP are:
· Maintain use per ERU at or below 200 gallons per day per single-family residence.
· Keep Maximum Day Demand less than twice the Annual Average Day Demand.
· Meter every source.
· Meter all demands as practicable and provide an estimate for demands that cannot be metered
(such as for flushing and firefighting).
· Maintain the water system to prevent leaks, promptly repair all leaks that occur, and maintain
the difference between volume of water produced and metered water used below 10 percent.
· Educate customers about their water sources and basic water supply principles.
e Work with the Navy, Bremerton's largest point water user, to enhance its water efficiency.
· Encourage a conservation ethic.
· Increase customer awareness of water-use habits and the value of water.
· Continue to reduce system wide per-capita water consumption.
· Improve system reliability.
· Protect environmental resources.
· Ensure water use efficiency prior to using new sources of supply.
Sources of Supply
3-6
2005 City of Bremerton Water Supply Plan
Under the new requirements, Bremerton will have to implement a public process for City
Council to set water efficiency goals considering:
· Historic water use efficiency performance,
· Historic water use efficiency investment,
Q Customer base demographics,
· Regional climate variations,
· Forecasted demand characteristics,
· Water supply characteristics,
· System financial viability,
· System reliability, and
· Affordability of water rates.
Implementation of water efficiency objectives has the potential for water savings on both a daily
demand basis and a peak demand basis, thereby delaying the need to develop costly new
resources and avoid capital costs. Water use efficiency programs will also be required if a
system will be requesting additional water rights or applying for State Revolving Fund loans.
Table 3.4 identifies the measures required for both medium and large public water systems under
the new water efficiency requirements. In addition to these measures; demand has also been
reduced by the 1992 Energy Policy Act, which requires efficient plumbing features in new
construction.
Table 3-4
Water Efficienc Re uirements
Overview of Proposed Water Use Efficiency Requirements for
Municipal Water Suppliers
>10,000 Connections
Required in Water System Plan (WSP):
· Source description
Monthly source production and seasonal variability descriptions
System Average Daily Demand and Maximum Daily Demand
Estimated population
Annual usage data and seasonal variability descriptions for customer classes
Current water demand
A forecast of current and 6- and 20-year demand (without meeting and meeting ~ater use efficiency goals) while addressing land use,
growth projections, and water use trends
Distribution system leakage evaluation
Water use efficiencymeasures using cost~effeCtivei1esscriteria or implementation
An evaluation of water reclamation opportunities
. Rate structure
An evaluation of rates that encourage efficient use of water
A description of the existing water use efficiency program
An estimate of the amount of water saved through implementation of programs over the last 6 years
An assessment of the maximum amount of water that could be saved through the implementation of all cost-effective water use
efficienc measures
Sources of Supply
3-7
2005 City of Bremerton Water Supply Plan
Outside the WSP:
Source meters
Service meters within 12 years
Water distribution system leakage standard set at 10 percent unless not technically feasible
Development of a plan to reduce leakage if over 10 percent standard
Leakage compliance calculated over a 3-year period
Quantitative water use efficiency goals every 6 years through public process
Annual perfonnance reporting
}\........Ilua! total source production
Annual leakage percent and volume
Narrative including goals description, schedule, and progress towards meeting goals
3.4 Water Rights Evaluation
The status of the City's water rights was reviewed and each right's characteristics and limitations
determined, so the City can fully utilize its water resources. An inventory of all Bremerton water
rights claims, certificates, and applications is listed in Table 3-5. The ability of the water rights to
meet future projected demands is presented in Table 3-6. This table contains several sources that
appear as water rights surplus, although they are currently not in use and have the following
explanations:
· Charleston Creek - This claim is for a historically-used source, which is no longer used.
· Anderson Creek - The City maintains this water right as an emergency source.
· Gorst Creek - The City maintains this water right as an emergency source.
Bremerton does not currently receive any of its water from interties with other systems. An
intertie exists between Bremerton's main system and the West 517 Zone. The City of Bremerton
holds water rights certificates and claims for both surface water and groundwater. With
Bremerton's dual sources, both current and forecasted 2024 average day demands and maximum
day demands can be met, as indicated in Table 3-5. These dual sources are operated
conjunctively to maximize resource efficiency. Generally, surface supplies are emphasized
during the high precipitation periods in the winter and spring, and groundwater sources are used
in addition to the surface water in the summerand fall. Since Bremerton's surface water supply is
unfiltered, the City relies on groundwater during times when storms cause the turbidity to
increase on the surface supplies above desired levels. It is essential that the City maintains
adequate groundwater supplies to maintain system reliability.
Because Bremerton utilizes an unfiltered surface source for 60 percent of its supplies, the City
needs to be able to meet average day demands with only well sources during the times the surface
supply is unavailable due to high turbidity or during severe drought conditions. Because severe
drought conditions are likely to correspond to maximum day demand periods, the City should
maintain capacity in its groundwater supply to meet all of the system demands. The City has the
following pending water right actions:
· Change of purpose and place of use for five Domsea wells to the Gorst Production Well
(Well 22) (1,200 gpm total, 233.5 gpm for consumptive use, 966.5 non-consumptive)
· Change of amount for Well 9 to 1,000 gpm (1,600 AFY)
· New application for WeIl21 (500 gpm, 800 AFY)
Sources of Supply
3-8
2005 City of Bremel10n Water Supr,. 'Ian
Current Water Right Status
Primary Existing Water Rights Existing Consumption Excess or Deficiency
Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum
Annual Annual
Certificate, or Rightholder or Priority Name/ Supple- Instantaneous Annual Volume Instantaneous Volume Instantaneous Volume Note
Flow Rate (Qi) Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) (Qa)(Acre-
Claim Number Claimant Date Number mental (gpm) (Qa)(Acre-Feet) (gpm) Feet) , (gpm) Feet)
Groundwater Certificates
City of Bremelion Well 18 P 600 677 370 596 230 81
G 1-25280C 7/25/1988 I
Gl-25797C City of Bremerton 8/2/1990 Well 20 P 1,150 1,300 1,150 1300 0 0 I
GI-25800C City of Bremerton 8/2/1990 Well 19 P 300 338 240 338 60 0
G J -24772C City of Bremerton ] 2/19/1985 Well 15 P 300 338 205 330 0 8 2
GI-23939C City of Bremerton 9/10/1981 Well 17 P 650 1040 735 1040 0 0 2
GI-23718C City of Bremerton 12/5/1980 Well 14 P 500 800 180 290 320 510
GI-22932C City of Bremer/on 8/1111977 Well 8 S 600 960 600 960
G 1-22933C City of Bremer/on 8/11/1977 Well 9 S 280 448 270 435
G 1-23367C City of Bremerton 4/11/1979 Well 13 P 680 1088 510 82] 170 267
G 1 *05570C
(3728) City of Bremerton 4/15/1960 Well 7 P 450 700 340 700 110 0
GI-23787C City of Bremer/on 3/6/1981 Well 16 (I) 130 75 140 225
- 5,414 Acre-
Total Ground - - - 5,510 gpm 6,281 Acre-Feet 4,600 gpm Feet 890 gpm 867 Acre- Feet **
Water
Certificates 7.9MGD 5.6MGD 6.6 MGD , 4.8MGD 1.3 MGD 0.8 MGD
Table 3.5 . Water Rights for Existing Condition
Note - Shaded Items are not Included ill totals.
Sources of Supply
3-9
2005 City of Bremerton Water Supp,.lan
~!"rent Water Right Status
Primary Existing Water Rights Existing Consumption Excess or Deficiency
Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum
Annual Annual
Certificate, 0 r Rightholder or Priority Name/ Supple- Instantaneous Annual Volume Instantaneous Volume Instantaneous Volume Note
Flow Rate (Qi) Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) (Qa)(Acre-
Claim Number Claimant Date Number mental (gpm) (Qa)(Acre-Feet) , (gpm) Feet) (gpm) Feet)
Surface Water Certificates
Union
RI*13553C River
(6945) City of Bremerton 8/12/1955 Reservoir (R) NA 4,000 NA NA NA 4,000
81*13552C Union
(6945) City of Bremelion 8/12/1955 River/ 801 P 11,220 (25 cfs) 4,000 1 ])20 4,000 0 0 *
R 1 *04178C Union
(2793) City of Bremelion 11/25/1935 River (R) NA 1,200 NA NA NA 1,200
Union
River
(West
81*02599C Branch )/
(2509) City of Bremelton 5/22/1929 S02 P 4,488 (10 cfs) 7,227 (,280 2,260 0 4967 *
Union
River (East
81 '02598C Braflch)/
(2222) City of Bremelton 5/22/1929 S03 P 2,244 (5 cfs) 3,6J4 0 NA 0 3,614 *
20,04] Acre-
feet
(Note - Surface
Water Firm
Yield is 6,260 /3,78/ Acre-
]7,952 gpm Acre-feet.) 12,500 gpm 6,260 Acre-feet 5,452 gpm feet
]7.9 MGD Note
(Surface Water
- Firm Yield is 5.6
Total Surface - 25.9 MGD MGD) 18.0 MGD 5.6MGD 7.9 MGD
- - 12.3 MGD *
Water
Certificates , 40 cfs , I 27.9 cfs I 12. I cfs
Table 3.5 continued - Water Rights for Existing Condition
Sources of Supply
3-10
2005 City of Bremerton Water Supp.. .Jlan
Table 3.5 continued - Water Rights for Existing Condition
Current Water Right Status
Primary Existing Water Rights Existing Consumption Excess or Deficiency
Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum
Name/ Supple- Annual Annual
Certificate, or Rightholder or Priority Instantaneous Annual Volume Instantaneous Volume Instantanl:ous Volume Note
Claim Number Claimant Date Number mental Flow Rate (Qi) Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) (Qa)(Acre-
(gpm) (Qa)(Acre-Feet) (gom) Feet) (gpm) Feet)
Groundwater Claims
] 16700 City of Bremel10n Oct-44 Well 6R/5R P 600 700 1,400 700 0 0 3
] 1670] Citv of Bremelion Jan-44 Well 6R/5R P 800 1,000 1,400 1,000 0 0 3
] ]6702 City of Bremelion Jun-44 Well 4 P 500 650 0 0 0 0
Well 3
116703 Citv of Bremel10n Jul-43 &3R P 1,200 1,500 1,840 1,500 0 0 4
116704 City of Bremel10n Seo-41 Wel12R P 1.200 1,500 835 1,344 365 156
116705 City of Breme110n Seo-40 Well] R/3R P 800 1,000 1,840 1,000 0 0 4
.
- - - 806 Acre-
- 5,100 gpm 6,350 Acre-feet 4,075 gpm 5,544 Acre-feet 0,865 gpm feet
Total Ground
Water Claims 7.3 MGD 5.7 MGD 5.9 MGD 4.9 MGD 1.2 MG'D OJ MGD
Surface Water Claims
Charleston currently not currently not currently
116706 City of Bremel10n Jun-02 Creek P 898 (2 cfs) 300 currently not used used used not used
Gorst emergency use emergency use emergency use emergency
116707 City of BremeJ10n Jun-II Creek! SO 5 P 6732 (15 cfs) 5000 only only only use only
Anderson emergency use emergency use emergency use emergency
116708 City of BremeJ10n Aug-03 Creek! S04 P 3590 (8 cfs) 3000 only only only use only
Not available or Emergency
8,300 Acre-feet Not available or Emergency Only Only
11,220 gpm
- - -
Total Surface - 16.2 MG'D 7.4 MGD
Water Claims 25 cfs
Shaded areas not included in totals.
Sources of Supply
3-11
2005 City of Bremelrton Water SUP.. _ i>lan
, , ,
Current VVater Rh'ht Status
Primary Existin!! Water Ri!!hts Existing' Consumotion Exces!; or Deficiency
Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum
Annual Annual Annual
Ccrtificate, or Rightholder or Priority Name/ Supple- Instantaneous Volume Instantaneous Volume Instantaneous Volume Note
Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) (Qa)(Acre-
Claim Number Claimant Date Number mental (!!om) Feet). (!!om) Feet) (!!om) Feet)
12,631 Acre-
10,610 gpm feet 10,958 Acre- 1,673 Acre-
Total 8,675 gpm feet 1,755 gpm feet
Groulldfvater
.' 15.3 MGD 11.3 MGD 12.5 MGD 9.8 MGD 2.5 MGD 1.5 MGD
20,04] Acre-
feet (Firm
Yield is 6,260 6,260 Acre- 13,781 Acre-
29,172 gpm A ere-feet.) 12,500 gpm feet 5,542 gpm feet
17.9 MGD
Note (Surface
Water Firm
Total Surface Yield is 5.6
Water (5) 42.0 MGD MGD) 18.0 MGD 5.6 MGD 7.9 MGD 12.3 MGD
32,672 Acre-
feet (18,816
aCI:essible
using firm
yield of 6,260
acre feet) 17,218 Acre- 15,454 Acre-
39,782 gpm 21,175gpm feet 7,207 gpm feet
29.2 MGD
(16.9 MGD
Accessible
Total using firm
Certificates yield of 5.6
and Claims (6) 57.3 MGD MGD) , 30.5 MGD r 15.4 MGD I 10.4 MGD 13.8 MGD
,
Table 3 5 continued. Water Rights for Existing Condition
Notes: I. 2, 3. and 4 - The existing water rights are either or both. 5 - Emergency and unused sources not included in totals. 6 - Totals do not include annual yolwnes for supplemental
rights, or instantaneous
and annuals amounts for irrigation, emergency or unused sources. · - For maximum annual yolwne, annual quantity was not established for surface water certificates. .* _ For existing
consumption, not all
wells pumped at the maximum Qi on the same day. therefore total Qi is not exceeded. (I) - Irrigation only (not included in totals). (R) - Reservoir, secondary rights (not included in
totals). S _ Supplemental to
existing rights (not included in Qa totals).
Sources of Supply
3-12
2005 City of Bremerton Water Supp.. ,.Ilan
Table 3.6 - Water Rights for Future Condition (2024)
. . ,
Forecast Water Use From Sources Water Right Status
Primary Existinl1 Water Ril1hts 20-Year Demand Excess or Deficiencv
Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum
Annual
Certificate, or Riightholder or Priority Name/ Supple- Instantaneous Volume Instantaneous Annual Volume Instantaneous Annual Volume Note
Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) Flow Rate (Qi)
Claim Number Claimant Date Number mental (I1Dm) Feet) ~ (Qa)(Acre-Feet) (gpm) (Qa)(Acre-Feet)
,
Groundwater Certificates
City of
G 1-25280C Bremerton . 32349 Well 18 P 600 677 370 596 230 177 I
City of
G 1-25797C Bremelion . 33087 Well 20 P 1,150 1,300 1,150 ] ,300 0 100 I
City of .
G 1-25 800C Bremerton 33087 Well 19 P 300 338 240 338 60 38
City of
G 1-24 772C Bremelion 31400 Well 15 P 300 338 205 330 0 38 2
City of
G 1-23939C Bremelion 29839 Well 17 P 650 1040 735 1040 0 590 2
City of
GI-23718C Bremetion 29560 Well 14 P 500 800 180 290 320 600
City of
GI-22932C Bremerton 28348 Well 8 S 600 960 600 960 0 NA
City of
G 1-22933C Bremelion 28348 Well 9 S 280 448 270 435 10 NA
City of
GI-23367C Bremelion 28956 Well 13 P 680 1088 510 821 170 688
G j*05570C City of
(3728) Bremerton 22021 Well 7 P 450 700 340 700 110 350
City of
Gl-23787C B rem erto n 29651 Well ]6 ( I) 130 75 140 120 NA NA
- - 6,281 Acre-
Tota' Ground - - 5,510 P'Dm feet 5,510 fUJm 6,281 Acre-feet 900 gpm 867 Acre-feet **
Water
Cen'ijicates 7.9 MGD 5.6 MGD 7.9MGD 5.6 MGD 1.3 MGD 0,8 MGD
Shaded areas not included in totals.
Sources of Supply
3-13
2005 City of Bremerton Water SUPP'.J r'lan
, ,
Forecast Water Use From Sources Water Right Status
Primary Existinl! Water Ril!hts 20-Year Demand Excess or Deficiencv
Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum
Annual
Certificate, or Rightholder or Priority Name! Supple- Instantaneous Volume Instantaneous Annual Volume Instantaneous Annual Volume Note
Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) Flow Rate (Qi)
Cla;im Number Claimant Date Number mental (l!om) Feet) (l!om) (Qa)(Acre-Feet) (gpm) (Qa)(Acre-Feet)
,
Surface Water Certificates
RI * 13553C City of Union River
(6945) Bremerton 8/1211 955 Reservoir (R) NA 4000 NA 0 NA 4000
Sl*13552C City of Union
(6945) Bremerton 8/1211 955 River! SO] P 1 ]220 4000 11220 4,000 0 - *
Rl *04178C City of
(2793) Bremerton 11!25/1935 Union River ( R) NA ]200 NA NA NA 1,200
Union River
(West
S I *02599C City of Branch)!
(2509) Bremerton 5/2211 929 S02 P 4488 7227 1280 2260 3208 4,967 *
Union River
(East
S I *()2598C City of Branch)!
(2222) Bn~merton 5/22!1929 S03 P 2244 3614 0 NA 1244 3,614 *
20,04] Acre-
]7,952 gpm feet ]2,500 gpm 6,260 Acre-feet 5,452 gpm 13,781 Acre-feet
- -
- - 25.9 MGD ]7.9 MGD ]8.0 MGD 5.6MGD 7.9 MGD 12.3 MGD *
(6,260 AF &
5.6 MGD are Additional storage
current firm and diversions are
Total Surface yield for not normally
Water Union River available on
Cert.ificates 40 cfs Svstem) 27.85 cfs ]2.1 cfs current system
, ,
Table 3.6 continued - Water Rights for Future Condition (2024)
Sources of Supply
3-14
2005 City of Bremerton Water SUPPI~ .'Ian
Table 3.6 continued. Water Riahts for Future Condition (2024)
Forecast Water Use From Sources Water Ri!!ht Status
Primary Existing Water Ril!'hts 20-Year Demand Excess or Deficiencv
Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum
Annual
Cerlificate, or Rightholdcr or Priority Name/ Supple- Instantaneous Volume Instantaneous Annual Volume Instantaneous Annual Volume Note
Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) Flow Rate (Qi)
Claim Number Claimant Date Number mental (gpm) Feet) (gpm) (Qa)(Acre-Feet) (gpm) (Qa)(Acre-Feet)
Groundwater Claims
City of Anderson
116700 Bremerton . Oct-44 Creek! S 11 P 600 700 1,400 700 0 100 3
City of Anderson
11670 I Bremerton Jan-44 Creek! S 1 0 P 800 1000 1,400 1,000 0 400 3
.
City of Anderson
116702 Bremerton Jun-44 Creek! S09 P 500 650 Abandoned Abandoned 500 650
City of Anderson
116703 Bremerton Jul-43 Creek! S08 P ]200 1500 1,840 1,500 0 500 4
City of . Anderson
.
116704 Bremerton S ep-4 I Creek! S07 P 1200 1500 835 1,344 365 404
City of Anderson
116705 Bremerton Seo-40 Creek! S06 p 800 1000 1,840 ],000 0 0 4
- - 6,350 Acre-
- - 5,/ 00 gpm feet 4,075 gpm 5,544 Acre-feet 0,865 gpm 2,054 Acre-feet
Tolal GrO~lI1d
Waler Claims 7.3 MGD 5,7 MGD 5,9MGD 4,9 MGD 1.2 MGD 1,8 MGD
, ,
Sources of Supply
3-15
2005 City of Bremelrton Water Sup~ ,'Ian
Forecast Water Use From Sources Water Right Status
Primary Existinl' Water Ril'hts 20-Year Demand Excess or Del1ciencv
Permit Name of Source or Maximum Maximum Maximum Maximum Maximum Maximum
Annual
Ce"til1cate, or Rightholder or Priority Name/ Supple- Instantaneous Volume Instantaneous Annual Volume Instantaneous Annual Volume Note
Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) Flow Rate (Qi)
Claim Number Claimant Date Number mental (gpm) Feet) (gpm) (Qa)(Acre-Feet) (g:pm) (Qa)(Acre-Feet)
Surface Water Claims
City of Charleston currently not currently not
116706 Bremerton Jun-02 Creek P 898 300 used currentlv not used used currentlv not used
City of Gorst Creek! emergency use emergency use
116707 Bremerton Jun-II S05 P 6732 5000 orily emer17ency use orily orilv ememencv use onlv
City of Anderson emergency use emergency use
116708 Bremerton Aug:-03 Creek! S04 P 3590 .3000 orily emerQencv use only orily emergency use orily
.
8,300 Acre-
11,220 gpm feet
- - Not available or Not available or Not available or Not available or
Tota/ SUllace - - /6.2 MGD 7.4 MGD Emergency Only Emergency Only Emergency Only Emergency Only
Water Claims 25 eft
Table 3.6 continued. Water Rights for Future Condition (2024)
Shaded areas not induded in totals:
Sources of Supply
3-16
2005 City of Bremerton Water Supr,. Ian
Forecast Water Use From Sources Water Right Status
Primary Existing Water Rights 20-Year Demand Excess or Deficiency
Permit Name of So u rce or Maximum Maximum Maximum Maximum Maximum Maximum
Annual
Certificate, or Rightholder or Priority Name/ Supple- Instantaneous Volume Instantaneous Annual Volume Instantaneous Annual Volume Note
Flow Rate (Qi) (Qa)(Acre- Flow Rate (Qi) Flow Rate (Qi)
Cla;m Number Claimant Date Number mental (gpm) Feet) (gpm) (Qa)(Acre-Feet) (gpm) (Qa)(Acre-Feet)
Totut
Groundwater - 12,631 Acre-
- - - 10,610 gpm feet 8,675 gpm 10,958 Acre-feet 1,265 gpm 1,023 Acre-feet
15.3 MGD 11.3 MGD 12.5 MGD 9.8 MGD 1.8 MGD 0.9 MGD
['' s"rm - 20,041 Acre-
Water (5) - - - 17,952 gpm feet 12,500 gpm 6,260 Acre-feet 5,452 gpm 13,781 Acre-feet
25.9 MGD 17.9 MGD 18.0 MGD 5.6 MGD 7.9 MGD 12.3 MGD
- - 32,672 Acre-
Total - - 28,562.0 gpm feet 21,175.0 gpm 17,218 Acre-feet 6,717.0 gpm 14,804 Acre-feet
Certificates
and Claims (6) 41.1 MGD 29.2 MGD 30.5 MGD 15.4 MGD 9.7 MGD 13.2 MGD
Table 3.6 continued. Water Rights for Future Condition (2024)
Notes: 1.2,3,4 - The existing water rights are either or both. 5 - Emergency and unused sources not included in totals. 6 - Totals do not include annual yolwnes for supplemental rights,
or instantaneous and
annuals amounts for inigation, emergency or unused sources. * - For maximum annual yolwne, annual quantity was not established for surface water certificates. ** - For existing consumption,
not all wells
pumped at the maximum Qi on the same day, therefore total Qi is not exceeded. (I) - lnigation only (not included in totals). (R) - Reservoir, secondary rights (not included in totals).
S - Supplemental to existing
rights (not included in Qa totals).
Sources of Supply
3-17
2005 Bremerton Water System Plan
Evaluation of current and future demands, Figures 3-1 and 3-2, shows the analysis of average day
demands and maximum day demands compared to existing water rights, accessible rights and
groundwater only. The projected 2024 average day demand is 14.0 MGD. Figure 3-1 shows that
while the City's water rights claims and certificates total an average day demand of 36.6 million
gallons per day (MGD), the firm yield of the surface supply system is only 5.6 MGD. Therefore,
the currently accessible portion of water rights (Firm Yield) plus groundwater rights totals 16.9
MGD. However, if the City had to rely on its groundwater supply only, a shortfall in installed
capacity and water rights would exist by the year 2016.
City of Bremerton Average Day Demand Analysis
2005 - 2024
40.0
5.0
II II II II II II II II II II II II II II II II II II II II
-------------------
...
35.0
30.0
o
Cl
~ 25.0
'"
tV
o
a;
;; 20.0
t:
.2
..
Cl
t: 15.0
~
:E
10.0
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Year
-- ADD demand --- Existing Water Rights . - - Firm Yield + GW Rights --><--- GW Rights Only -l<- GW Installed Capacity I
Figure 3-1
The projected maximum day demand (MDD) for the year 2024 is 27.9 MGD. Figure 3-2 shows
the existing water rights for the City total 57.3 MGD; however, removing the emergency supplies
leaves 40 MGD of available rights. Since the surface water source is unfiltered and future
climate change may affect the groundwater supply, it is important to consider the ability of the
system to meet demands from its groundwater supplies bnly. The figure shows that the existing
maximum day demands cannot. be met by the existing groundwater instantaneous rights or the
installed capacity. To meet future demands from groundwater only, additional groundwater
rights (Qa and Qi) and installed capacity of 4.2 MGD Qa (4,688 acre-feet Qa), 13.9 MGD Qi,
and 16.4 MGD of installed capacity are needed. Table 3.7 provides a summary of the analysis.
Sources oj Supply
3-18
2005 Bremerton Water System Plan
MGD - Million Gallons Per Day City of Bremerton Maximum Day Demand Analysis
2005 - 2024
45.0
40.0
35.0
30.0 . . . . ;; . . . . . . . . . . . . . . .
25.0
20.0
15.0
x ~~ )( )< )( )< )< :~ )( )< )1( )( )< J( )< ~( )< )1( )< ll::
10.0
5.0
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Year
-- Existing Water Rights
-- GW Installed Ca ad
Figure 3-2
Table 3-7
Anal sis of Existin and Future Water Demands and Water Ri hts
Forecasted Water Rights for the City of Bremerton
Groundwater Only
2004 2004 Can 2004 ADD of Can 2024 ADD of Can 2004 MDD Can 2024
Qa water Qi water 8.1 MGD be met 13.81 MGD be of ]4.9 MGD be MDD of27.63
rights rights with Qa? met with Qa? met with Qi? MGD be met
MGD MGD with Qi?
29.2
(16.9 MGD 41.1 Yes Yes Yes Yes
using Finn
Yield
11.3 14.0. Yes
15.3 29.5 Yes
9.7 11.5 Yes
Combined Sources
Combined Sources
- Installed
Capacity
Groundwater Only
Installed Capacity
Notes:
Qa = the certificated annual quantity (ac-ftIyr converted to MGD)
Qi = the certificated insta.itaiieous qUdJJtitj (gpm converted to ~vfGD)
This table does not include water rights Bremerton has for supplemental (annual only), irrigation, unused, or emergency sources.
Annual quantity for surface water is not established; therefore, the firm yield of the Union River system (5.6 MGD) was used for the installed
capacity. Instantaneous surface supply use is currently limited to -18 MGD by the size of the transmission line.
Sources of Supply
3-19
2005 Bremerton Water System Plan
The City filed four applications in 1954/57 for withdrawal and storage from the Hamma Hamma
river system. This surface source was evaluated in past reports and identified as a potential
regional supply in the Kitsap County CWSP. Ecology contacted the City in 1998 regarding
these applications, since the Hillis legal decision required the State to act on applications in order
of date. The City responded that any decision regarding this application should be held off
pending resolution of important water rights and ESA questions. In April 1999, Ecology denied
these applications, and Bremerton did not appea1.
In recent years, it has become increasingly difficult to obtain new water rights from Ecology.
This is due to a combination of factors, including inadequate staffing at Ecology, increased
attention to protection of instream flows, inadequate data or consensus on the relationship
between groundwater withdrawals and stream flows, and implementation of WRIA-based state-
funded watershed plans. Some improvement has occurred in recent years, since Ecology is now
processing change applications. However, no definitive solution to this problem seems to exist.
Ecology anticipated collaborative watershed plans would help determine whether new rights can
be issued in each basin. A watershed planning process was funded for WRIA 15, the basin
comprising the Kitsap Peninsula and including Bremerton's sources of supply. However, after
five years of work and development of a draft plan, the plan was rejected due to the veto of the
Sqauxin Island Tribe, an initiating government. This action halted the watershed process, and
WRIA 15 will not be eligible for further watershed implementation funds.
Utilizing changes to existing water rights can be an alternative to making application for and
securing additional new water rights. Several advantages to this include the better potential for
approval of an application for change than a new application and obtaining water rights with
earlier priority dates than for a new application. The following approaches are recommended for
securing needed new water sources:
· Continue to pursue Domsea Wells change application for the new well drilled in 1993.
. Continue to pursue application for Well 9.
· Continue to pursue application on Well 21 (Emergency Water Rights were received in 2001).
. The City is currently maximizing surface water sources and new sources will likely be
groundwater. A letter has been sent to PUD #1 regarding drilling a test well to potentially
serve an area of planned industrial growth in the City' s West 517 Zone.
. Apply for a replacement well for Well 4 for 865 gpm and 806 aflyr to maximize these claims.
. Apply for anew groundwater permit for supplemental water rights of 890 gpm and 867 aflyr
to use unused existing groundwater certificate capacity.
. Apply for a new wellfie1d permitwith a capacity of 3,500 gpm (for 20 year demand) and at
least 5,000 aflyr to ensure reliability in the water system in case of drought or other
conditions that would render the surface water supply unavailable.
. Alternately, if the hydrogeological study shows potential for aquifer storage and recharge
(ASR), apply for a storage permit for groundwater.
Sources of Supply
3-20
2005 Bremerton Water System Plan
· Conduct hydrogeological investigations to determine the potential impact on surface water
supplies for the wellfield operation.
All of the above options for water right changes will be fully considered by the City as elements
in developing strategies to meet future demand projections.
3.5 !nterties
As defined within RCW 90.03.383, the City has one emergency and five non-emergency interties
as listed below. The emergency intertie to North Perry Water District was installed in the early
1980s and has never been used. The non-emergency interties are:
. City of Port Orchard
. Puget Sound Naval Shipyard
. Jackson Park Naval Housing
. Rocky Point Water District
· City of Bremerton West 517 Zone Water System (identified as a separate water system by
DOH)
Table 3-8 lists pertinent information on the interties. The City can provide water to each of the
areas listed in Table 3-8. Except for Port Orchard and North Perry Avenue Water District, these
areas do not have their own sources of potable water that could serve the City. Port Orchard and
North Perry do not have excess supply capacity that could supplement the City's water sources
on a sustained basis. Therefore, these interties cannot assist in meeting future Bremerton
demands.
Table 3-8
City of Bremerton Interties with Outside Water Systems
System Served Area Served Purpose Direction Instantaneous Capacity
Supplements Port Orchard
Northern portion of demand and provides an To Port Orchard ] ,000 gpm
Port Orchard emergency source to Port
City of Port Orchard Orchard
Supplements Port Orchard
McCormick Water demand and provides an To Port Orchard I ,800 gpm
System emergency source to Port
Orchard
Puget Sound Naval Provides all potable water for
Shipyard and Bremerton PSNS properties PSNS properties To PSNS only Approximately3,000 gpm
Naval Station
Jackson Park Naval Jackson Park Provides all municipal water To Jackson Park Approximately 2,000 gpm
Housing housing complex demand for Jackson Park only
Rocky Point Water Entire Rocky Point Provides all municipal water To Rocky Point only Not determined
District Peninsula for Rockv Point
North Perry Water North Perry Water Emergency Supply Bi-directional Approximately 450 gpm
District District
Sources of Supply
3-21
2005 Bremerton Water System Plan
3.6 Aquifer Recharge
Aquifer recharge is one potential option for additional future sources of water supply for
municipalities. In most instances, aquifer recharge consists of introducing groundwater or
surface water into a groundwater aquifer, storing the water in the aquifer for a period, and then
withdrawing the water through wells later.
The City has been following a procedure incorporating the concepts of aquifer recharge in which
surface water is diverted from the Union River into Twin Lakes. Studies show that water
introduced into Twin Lakes percolates into and recharges the Twin Lakes Aquifer and then flows
laterally into both the Union River and Gorst Creek Basins. The City then recaptures a portion of
this aquifer recharge through City wells. All required water rights authorizations are in place.
The State of Washington recently formalized a procedure for dealing with this practice. Aquifer
recharge programs have been undertaken by a few. municipalities, such as Seattle at their
HighIine Wellfield, Yakima, and Walla Walla. Bremerton has plans to pursue this option, which
may allow more use of the Gorst area aquifers.
3.7 Water Reuse
The City owns and operates a secondary Wastewater treatment plant (WWTP) with an average
flow of about 6.2 MGD, which could potentially be reclaimed after further filtration. Water reuse
is the beneficial use of reciaimed wastewater treatment plant effluent in compliance with
Washington Departments of Ecology and Health regulations.
Bremerton's WWTP currently uses reclaimed secondary wastewater effluent for process and
odor control and to irrigate inside the WWTP grounds and at a neighboring business.
Approximately 150 gpm are used for in-plant uses, and an additional 120 gpm are used in the
summer months for an annual total of 88 MG/year. A "Water Reuse Feasibility Study"
completed in 1998 identified the potential demands for and costs to provide additional reclaimed
water to potential users in the Bremerton area. Bremerton's wastewater has higher than average
saltwater from collection system infiltration and Puget Sound Naval Shipyard inflow making
reuse possibilities challenging.
A 2005 County-wide reuse study indicated that Bremerton had the least potential for large-scale
reuse and recommended grant funding be focused at other locations with more feasible reuse
opportunities. The City is currently evaluating the next step to take in reuse.
3.8 Treatment
DOH recommends that purVeyors experiencing reduction or loss of water sources due to water
quality problems consider treatment to restore the source. This approach does not apply to the
City's water system, since its main sources are not impaired by water quality problems.
However, both Anderson Creek and Gorst Creek were historically used by the City and are
maintained as emergency supplies. To be used long term, both sources would need to be treated
in compliance with the SWTR.
Sources of Supply
3-22
2005 Bremerton Water System Plan
The Long Term 2 Enhanced Surface Water Treatment Rule was promulgated in December 2005.
This new rule will require the City of Bremerton to conduct further Cryptosporidium monitoring
and to provide a second disinfectant in addition to chlorine. Section 4 provides further analysis of
the impacts of this new federal rule on Bremerton. Should reliability or quality of Bremerton's
surface supplies become an issue, then filtration would be an option to consider.
~ a I"' Ii ..".,. ....,.. I"' h ... ... ,.. .....
oJ.v ,",lIl1lcn.v ,",lIall~v
Increasing greenhouse gases in the atmosphere lead to an increase in the earth's air temperature.
Evaluation of long-term temperature records for the Pacific Northwest shows substantial
warming during the 20th century. A considerable body of research leads to the conclusion that
the increase in globally-averaged temperature in the past 30-50 years is largely due to the rapidly
rising greenhouse gases. Concentrations of greenhouse gases are much higher than they have
been at any time since the rise of civilization 10,000 years ago. The climate, land surface,
glaciers, and oceans are responding to these changes. Anticipating future directions of change is
crucial in order to minimize the impacts of future change on water resource management.
Current global and regional climate change models predict the following:
· Climate change is a reality - the future will be warmer but uncertainty is unavoidable.
· Climatological history is not a reliable guide to predicting the future.
· Average temperatures are increasing, and the Puget Sound region warmed at a rate faster than
the global average.
· Sea levels in the Puget Sound will rise 4 to 35 inches in the next century due to climate
change and the already-occurring land sinking in Puget Sound.
· Less certainty exists about how climate change will affect precipitation. However, models
indicate that although annual average precipitation could stay about the same, winter
precipitation will increase slightly, and summer precipitation will decrease slightly.
. Increases in intensity of winter rains are expected.
. Snow pack is decreasing. .
The main messages for water system managers from recent climate change research are:
. Preparing for climate change is a high-stakes exercise in risk management.
. Develop a climate change "insurance portfolio."
· Integrate climate change projections in all appropriate City planning documents.
· Summer drought is the Northwest's biggest vulnerability in a climate change scenario.
· Expect surprises, enhance the water system's ability to respond to change, and ensure
flexibility.
Table 3-9 identifies what climate change could mean for Bremerton's water system management:
Sources of Supply
3-23
2005 Bremerton Water System Plan
Table 3-9
Potential Impact of Climate Change on Water Supply
Climate Change Prediction Impact Action Plan
Could cause turbidity problems in the reservoir and I. Ensure maximization of groundwater capacity
through increased overflow events requiring extended
shutdowns of Bremerton's unfiltered surface supply. 2. Explore costs of filtration
Could change assumptions in Bremerton's firm yield I. Revisit firm yield assumptions as more
calculations. information is available from regional
Increased intensity of winter modeling.
rams I. Revisit this issue as more information is
Could limit storage flexibility if inflow is restricted to a available from regional climate modeling.
tighter window. 2. Revisit Twin Lakes diversion protocols.
3. Explore ways to increase Union River
capacity.
Could reduce groundwater recharge. I. Track aquifer characteristics.
2. Watch for aquifer over-drafting.
I. Continue to track/trend water use and MOD.
Could increase summer water demands and Maximum 2. Focus conservation message to reducing
Day Demand. outdoor water use
3. Explore seasonal water pricing.
I. Track ET values and look for trends.
2. Revisit finn yield assumptions as more
Could increase water loss from ET. information is available from regional
modeling.
Warmer and drier summers 3. Estimate changes in supply from climate
change.
. I. Keep water shortage plan up-to-date.
Could increase occurrence of droughts. 2. Emphasize day-to-day conservation habits.
3. Explore more use of interties.
Could affect algae growth in the reservoir. I. Continue tracking algal growth patterns.
Could increase wildfire occurrence. I. Place extra emphasis on wildfire patrols.
Could cause ecosystem effects in the forested watershed I. Monitor forest effects of climate change.
such as pest infestation.
Sea level rise Could cause saltwater intrusion in wells. I. IdentifY wells at possible risk.
2. M omtor and trend groundwater chlorides.
Would not directly impact Bremerton, but would impact I. Track conservation and water use messages
Decreased snow pack larger Puget Sound area surface water systems that from Seattle and other snow-pack systems.
dominate the media. 2. Increase public outreach for Bremerton if our
message is different.
3.10 Water System Reliability Analysis
Water System reliability is the degree to which an adequate quantity of water canbe provided at
acceptable service standards. The areas of reliability are source reliability for water quantity and
quality, water right adequacy, customer service, and facility reliability. The actions that
Bremerton takes to increase reliability are described below.
3.10.1 Source Reliability - Water Quantity
· Bremerton's dual-source system of surface Water and groundwater provides system
reliability, flexibility, and redundancy. In the event that surface sources are
unavailable due to turbidity events or water shortage, then ADD can be met with
groundwater sources only. hl the event that an individual groundwater source is
unavailable, then the system is flexible enough to meet demands with other sources.
Bremerton's plan is to increase groundwater supplies to increase reliability.
Sources of Supply
3-24
2005 Bremerton Water System Plan
· In the event of a severe water shortage, the City has several emergency sources
available, including Anderson Creek and Gorst Creek. Bremerton has a Water
Shortage Contingency Plan that was successfully implemented during the 2001
drought. Bremerton actively educates customers on storing emergency water
supplies. A countywide Emergency Water Plan is in progress.
· Bremerton has two drilled wells awaiting water lights approval for use III an
emergency.
· Hydraulic studies such as the Gorst Creek Basin Study and the Kitsap County
Groundwater Management Plan give valuable information on water quantities of the
aquifers utilized by the City.
· Bremerton completed a Water Reuse Feasibility Study to identify possible uses for
reclaimed water. Some reuse applications are currently in place at the WWTP.
· Well levels for all City groundwater sources are monitored to ensure aquifers are not
being depleted. These data are entered into a computerized data base to easily
determine trends.
· A firm yield analysis of the Union River system was performed in 1999 to provide
information to maximize, yet not over-use, the City's surface water supplies.
· Bremerton has an active water conservation program described in Section 3.3 that
goes beyond the minimum requirements.
3.10.2 Source Reliability - Water Quality
Sources oj Supply
3-25
2005 Bremerton Water System Plan
· Disinfection is also ensured throughout the distribution system through maintenance
of a free chlorine residual. Weekly coliform monitoring conducted in accordance
with the City's Coliform Monitoring Pl3-Tl provides feedback on disinfection
adequacy.
· All of the City's water quality data are tracked in a computer data base so trends and
changes can be easily discerned.
· Bremerton has an effective cross connection control program to prevent
contamination of the water in the distribution system.
· The City's annual flushing program helps protect distribution system water quality.
· Reservoirs are regularly inspected to prevent entry of contaminants.
· The City's corrosion control treatment facility ensures that corrosion of household
plumbing does not occur.
· Computerized tracking of customer water quality complaints assists in addressing
distribution system issues.
3.10.3 Water Right Adequacy
The City's water rights were reviewed and are presented in Section 3.4. The City
currently has adequate water rights with its combined sources to meet projected demands
through the planning period.
3.10.4 Facility Reliability
· Section 8 describes the system analysis that was conducted to ensure adequate fire
flows and to evaluate water system improvements. The City's Capital Improvement
Program (CIP) outlines how improvements will be addressed.
· Section 6 describes backup systems and redundancy criteria used by Bremerton for
design of the system.
· Bremerton has implemented most of the recommended seismic upgrades identified in
the 1997 Earthquake Vulnerability Assessment, including bracing the Casad Dam
intake tower, improving reservoir foundation stability, and installing several seismic
valves.
· All water operators and most maintenance personnel are state-certified in water
distribution system operation. Bremerton has an active program of training in safety,
facility operation, and regulations. This ensures responsible operation and
maintenance of facilities.
Sources of Supply
3-26
2005 Bremerton Water System Plan
· Regular and preventive maintenance of system components, including reservoirs,
wells, pump stations, valves, and fire hydrants, is tracked by a computerized
maintenance management program.
· The City evaluated water system facility vulnerability to seismic events in the Water
System Earthquake Vulnerability Assessment (1997). Recommended actions are
mostly complete and scheduled in the City's CIP.
· Casad Dam and Reservoir 4 are impoundments regulated by the Department of
Ecology Dam Safety Section and have written Operation and Maintenance Programs
and Dam Safety Plans implemented by the City.
· The chlorine facility at McKenna Falls is in compliance with its Risk Management
Plan, which is implemented by the City.
· All major water system facilities are visited at least daily by state-certified water
operations personnel.
- The SCADA system automatically calls out operations personnel when system alarm
set-points are exceeded or if power outages or communication failures occur. This
telemetry system is currently being converted from telephone to radio to increase
reliabili ty.
-The City has an Emergency Response Plan and provides training and practice drills
for Water Utility personnel.
3.10.5 Customer Service Reliability
- Water quality and conservation information IS posted on the City's website
(www.ci.bremerton.wa.us)to communicate the value of water.
- A consumer confidence report is sent in the customer bills each spring.
· Bremerton has a Customer Response number (473-5920) to call to dispatch a
Customer Response Technician for water service issues within two hours.
· Customer calls are logged into a data base.
· Customers are notified about planned flushing activities in the newspaper and on
neighborhood signs. A water quality and flushing hot line (473-5490) is also
available.
- Customers are notified of planned water service disruptions by door hangers.
· Customer water information is also disseminated at city facilities and local libraries
and at special events.
Sources of Supply
3-27
2005 Bremerton Water System Plan
3.11 References
Casad Dam Emergency Response Plan. Army Corps of Engineering. 2000.
Coliform Monitoring Plan. City of Bremerton. Updated annually.
r(\n"pr"",t;(\n Pl",nn;na "Rpflll;rpTnpnt" ()l-l 100Ll.
'-''-'..........-... ..'-A....l'-'.l........ ...to..4.....LI...........J.b .............."'1~.I....l.-....l..._.........u. '-'.A-..I.. .J.././ ..
Earthquake Vulnerability Assessment. Dames and Moore. 1997.
Energy Policy Act. 1992
Gorst Creek Basin Study. AGI Technologies. 1996.
Handbook of Water Use and ConserVation. Amy Vickers. Waterplow Press. 2001.
Kitsap County Groundwater Management Plan. 1997
Kitsap County Initial Basin Assessment. Economic and Engineering Services, Inc., Kramer Chin
and Mayo, Pacific GroundwaterGroup, and Robinson and Noble, Inc. 1997.
Kitsap County Water Reuse Evaluation and Prioritization. Golder and Associates. Draft 2005.
Risk Management Plan for Chlorine. Weston, Inc. 1999. Updated by City of Bremerton 2004.
Technical Memorandum - Union River Supply and Firm Yield. Economic and Engineering
Services. 1999.
Uncertain Future: Climate Change and its Effects on Puget Sound. Puget Sound Action Team.
2005.
Washington State Water Conservation Planning Handbook. 1991.
Washington State Water Reclamation and Reuse Standards.
Water Reuse Feasibility Study. Brown and Caldwell. 1998.
Water Rights Analysis. CH2M Hill. 2002.
Water Shortage Contingency Plan. City of Bremerton. 2001.
Water Utility Emergency Response Plan. City of Bremerton. 2004.
Water Use Efficiency Plan (draft). City of Bremerton. 2005.
Wellhead Protection Investigation. Final Report. AGI Technologies. 1996.
WRIA 15 Draft Watershed Plan including technical studies prepared by Golder and Associates
(concurrence not reached).
Sources of Supply
3-28
2005 City of Bremerton Water System Plan
Section 4
Water Quality Review and Regulatory
Compliance
4.1 Objective and Approach
This chapter provides a review of current state and federal drinking water regulations pursuant to
the Safe Drinking Water Act (SDW A) and an assessment of the City's compliance status based
on water quality data and information collected for the period 2000 to 2005. This chapter also
summarizes applicable anticipated regulations and their potential implications to the City. The
approach used to achieve these objectives includes the following:
. Overview of the City's sources of supply
. Description of current state and federal drinking water regulations
. Description of upcoming reguiations that could impact the City's system
. Review of existing monitoring plans, practices, and water quality data
. Assessment of existing compliance status and potential future compliance issues
. Proposed action plan to ensure continued compliance
4.2 Description of State and Federal Regulatory Framework
The City provides 100 percent of its own drinking water and supplies water to an additional four
contract customers. The City is responsible for monitoring and compliance with all SDW A and
state regulations pertaining to source water and distribution system water quality that are
applicable to unfiltered surface water and groundwater systems.
4.2.1 Safe Drinking Water Act
The federal regulatory framework directing water quality is the SDW A of 1974 and its
1986 and 1996 amendments. The SDW A and amendments, as administered by the EP A,
significantly impact the operation and monitoring of the Bremerton water systems.
The regulatory impacts to Bremerton include requirements for filtration avoidance,
disinfection, bacteriological quality, disinfection by-products, and source and system
water quality monitoring.
A '" '" \AI__L:__.l.__ ^ ~__:_:_...._-:...:..._ ,,_..:J_
"'t."-."- VVd~IIIIIHlUIII"\UIIIIIII~lIdllVe ....uue
The State law that incorporates the SDW A and its amendments is Chapter 246-290 of the
Washington Administrative Code (WAC 246-290). DOH is the primacy agency
responsible for ensuring state drinking water laws are implemented and enforced. Both
the Main System and the West 517 Zone are classified as Group A public water systems.
However, according to WAC 246-290-020, the main system is classified as a community
Water Quality Review and RegulatOl}' Compliance
4-1
2005 City of Bremerton Water System Plan
water system (CWS), while the West 517 Zone is classified as a non-transient, non-
community (NTNC) water system (with a service population of about 400). The City is
required to meet drinking water quality regulations and conform to sampling and
reporting requirements for these systems.
4.3 System and Supply Overview
While Bremerton is responsible for meeting treatment, water quality, and monitoring regulations
at its points of delivery, each of the four separate contract systems served is required to ensure
compliance with water quality and monitoring requirements within its distribution systems.
The City utilizes both surface and groundwater sources to meet supply needs. On a system-wide
basis, about 60 percent of annual production is derived from the Union River surface source,
with the remaining 40 percent obtained from groundwater production wells located throughout
the service area.
The City operates the Union River supply under the filtration avoidance criteria of the Surface
Water Treatment Rule (SWTR), which requires watershed protection and control to maintain
high quality source water. The surface supply is treated with chlorine at the McKenna Falls
Intake Facility to meet the SWTR disinfection requirements for Giardia lamblia and viruses.
Caustic soda is applied upstream of Reservoir 4 to adjust pH for distribution system corrosion
control. The Union River surface water firm yield estimate is 2,020 million gallons per year. This
supply directly feeds the West 256 and East 240 zones.
The groundwater production wells are located throughout the service area and described in
Section 3 and Table 4-1. Each well, with the exception of Well 19, is equipped with chlorination
facilities (either gas or hypochlorite) for disinfection. The City drilled two other wells that have
not yet been put into production, as they are currently pending source and water right approval.
The West 517 Zone is supplied by three production wells: 15, 18R, and 19. This zone also has
an intertie with the surface water transmission main. Water can move through the intertie in
either direction (pumping is required to move water to the West 517 Zone but can be gravity fed
into the West 256 Zone).
Table 4-1 provides a reference summary of the City's sources of supply and their associated
identification numbers, including City Source ID, DOH Source Number, and DOH Plant ID
number. The DOH Plant ID numbers were created in 2002 to designate unique entry points to
the system for monitoring purposes.
Water Quality Review and Regulatory Compliance
4~2
2005 City of Bremerton Water System Plan
Table 4-1
Summary of City Sources of Supply
City Source ID Description DOH DOH Plant ID
Source No
Union River Main Stem Union River SOl T-1
West Branch West Branch Union River S02 T-1
Well1R1 Anderson Creek In progress T-2
Well 2 R1 Anderson Creek In progress T-2
Well 3 Anderson Creek S08 T-2
Well6R1 Anderson Creek Replacement In progress T-2
Well 7 Anderson Creek S12 Te2
Well 8 Anderson Creek S13 T-2
Well 9 East Bremerton S16 TA
Well 13 East Bremerton S14 T-3
Well 14 East Bremerton S15 . T-5
Well 15 . Twin Lakes (West 517 Zone) S20/S0 12 N/A
Well 163 Irrigation Supply Well None N/A
Well 17 Gorst Creek Watershed S17 T-1
Well 18R1 Twin Lakes (West 517 Zone) S 19/5052 T-1
Well 19 Twin Lakes (West 517 Zone) S21/S032 N/A
Well 20 Twin Lakes (Main System) S22 T-1
Well 214 Future Supply Well None N/A
Well 224 Future Supply Well None N/A
I. Replacement Wells
2. DOH source numbers were revised in 200 I when the West 517 Zone was reclassified as a separate system
3. Irrigation only; not connected to the domestic system
4. Application submitted - pending water rights approval
4.4 Water Quality Regulations
Water quality regulations applicable to the City during the 2000-2005 review period are listed in
Table 4-2. A discussion of each rule follows.
4.4.1 Phase I, II, and V Rules
Regulatory Elements
Federal Organic, Synthetic Organic and Inorganic Che111icals Phases I, II and V Rules and
WAC 246-290-300 address monitoring requirements and maximum contaminant levels
(MCLs) for inorganic (laC), synthetic organic (SOC), and volatile organic (YOC)
~~--~"-d~ T Tnrle- <he Phas~ TT ~~rl " Dnl=~ i\A0T ~ ~-= ~=< +~- 16 Tr\0~ 30 Cr\0S ~~rl
\""Ulll}lUUll ~. U lU -1 lil 1 v Ll aHU v 1-'-UIL-,:), IVlvL.:) al..... .:')"-'l .LV! 1 .l'LIv.);, L .....:nJ\......- , Ul1U
21 YOCs. Monitoring requirements are determined by DOH based on a vulnerability
assessment. WAC 246-290-300 requires these compounds to be monitored at each source
on 12 to 36 month sampling cycles, depending on the contaminant and source type.
Water Quality Review and Regulatory Compliance
4-3
2005 City of Bremerton Water System Plan
Table 4-2
Safe Drinking Water Act Rules
Rule Parameters Regulated Regulatory Milestone
Effective Date
Phase I Rules V olatile Organic Compounds January 1989
Phase II and V Rules Inorganic and Synthetic Organic Compounds January 1993
Arsenic Rule Arsenic January 2006
Radionuc1ides Rule Combined Radium, Gross Alpha, Beta and December 2003
Photon emitters, and Uranium .
Lead and Copper Rule Lead, Copper, water quality parameters December 1992
Total Coliform Rule Total and Fecal Coliform, E. coli December 1990
.
Surface Water Treatment Rule Turbidity, Giardia lamblia, enteric viruses, December 1990
Legionella, HPC
Interim Enhanced Surface .
Water Treatment Rule Turbidity, Cryptosporidium February 1999
Stage I Trihalomethanes, Halo acetic Acids, Chlorine February 1999
Disinfectants/Disinfection Residual, Total Organic Carbon, others
Consumer Confidence Requires annual report addressing drinking September 1998
Reports Rule water quality
As part of the Phase II Rule, systems with a significant amount of asbestos-cement (AC)
pipe must conduct periodic asbestos monitoring in the distribution system. In Washington
State, DOH historically required systems containing more than 10 percent AC pipe to
comply with the monitoring requirement. These systems must collect one sample in the
distribution system at a tap served by AC pipe under conditions where asbestos
contamination is most likely to occur.
Bremerton Status
Prior to 2003, the City conducted its monitoring for inorganic and organic compounds on
individual sources. However, beginning in 2003, the monitoring locations were changed
to designated entry points in the distribution system to be consistent with updated state
regulations. For the main system, this includes the five entry point locations identified as
1'T'"'f,1I l_rT"'~. r,-.11 A"1 T"'" 0.1_'1;'11_..(".'-1""'_ . '.L.:._" _...1 _""-_...1.L 1 .c
1-1 mrougn 1-,) III 1 aDle Lt-1. ror me YV eSl .) 1 / Lune, monlLonng IS ConUUcleu al eacn 01 .
the three wells. The City maintains separate monitoring plans for the main system and
West 517 Zone and conducts monitoring according to these plans.
Water Quality Review and Regulatory Compliance
4-4
2005 City of Bremerton Water System Plan
Main System:
The City performs monitoring of primary and secondary IOCs and physical parameters
according to its Main System Monitoring Plan for Inorganic Chemicals (last updated
March 2005). The City currently monitors entry point T-l (which includes the Union
River surface supply and Wells 17 and 20) annually for IOCs, physical parameters, nitrite,
and nitrate. Sampling was most recently completed in May 2005. The City currently
monitors entry points T-2 through T-5 (all of which include entirely groundwater
supplies) once each three-year compliance period for IOCs, physical parameters, and
nitrite and annually for nitrate. IOC monitoring for the 2005-2007 compliance cycle for
entry points T-2, T-3 and T-5 is scheduled for 2007. A review of monitoring data
collected since 1999 shows that the City has maintained compliance with all primary
MCLs at each of these entry points. With regard to secondary inorganics and physical
parameters, periodic exceedance of secondary MCLs for manganese (0.05 mg/1) and color
(15 color units) has occurred. However, compliance with secondary MCLs is voluntary.
The main system contains nearly 130,000 feet ofAC pipe, accounting for approximately
8.5 percent of the pipe inventory in this system. Although monitoring for asbestos was
not required, the City sampled the main system in 1995 and 2004. All results were below
the detection limit.
The City performs monitoring of VOCs and SOCs according to its Main System
Monitoring Plan for Organic Chemicals. The City is currently on a reduced monitoring
schedule for VOCs, with one round of sampling required at each entry point each three-
year compliance period. Sampling was most recently completed in July 2005 at each of
the five entry points. All VOC results since 2000 have been below the detection limit.
With regard to SOCs, the City has been eligible for waivers for its wells and Union River
supply since 1993 due to their low susceptibility rating. Waivers were obtained for the
periods 1993-1995, 1996-1998, and 1999-2001. The City performed entry point SOC
monitoring in 2002 and 2003 as part of the Unregulated Contaminants Monitoring Rule
(UCMR), and all results were below the detection limit. The City reapplied for and was
granted SOC waivers for the 2005-2007 monitoring period.
West 517 Zone
The City performs monitoring of primary and secondary IOCs and physical parameters
according to its West 517 Zone Monitoring Plan for Inorganic Chemicals. The City
currently monitors each well (15, 18R, and 19) once each three-yearcompEance period
for IOCs, physical parameters, and nitrite. The most recent round of sampling was
performed in March 2004. A review of monitoring data collected since 2000 shows that
the City has maintained compliance with all primary and secondary MCLs at each well.
The City monitors each well annually for nitrate. Since 2000, the maximum nitrate
observation was 1.9 mg/L as N observed at Weii 19.
Water Quality Review and Regulatory Compliance
4-5
2005 City of Bremerton Water System Plan
The West 517 Zone contains roughly 36,000 feet of AC pipe, accounting for
approximately 60 percent of the pipe inventory in this system. According to DOH
requirements, the City performs asbestos monitoring in the West 517 distribution system
during the first three-year period of each 9-year compliance cycle. The most recent
sample was collected in August 2004, and no asbestos was detected. The next 9-year
cycle begins January 2011.
The City performs monitoring of VOCs and SOCs according to its West 5 J 7 Zone
Monitoring Plan for Organic Chemicals. The City is currently on a reduced monitoring
schedule for VOCs, with one round of sampling required each three-year compliance
period. Sampling was most recently completed in July 2005. All results since 2000 have
been below the detection limit. With regard to SOCs, the City has been eligible for SOC
waivers for its wells since 1993 due to their low susceptibility rating. Waivers were
obtained for the periods 1993-1995, 1996'-1998, and 1999-2001 and 2002-2004. The City
reapplied for and was granted SOC waivers for all sources for the 2005-2007 monitoring
period.
4.4.2 Arsenic Rule
Regulatory Elements
The original arsenic MCL of 0.05 mg/L was established as part of the 1975 National
Interim Primary Drinking Water Regulations. After years of additional health effects
research and cost/benefit analysis, the EP A published the final Arsenic Rule in January
2001, with an effective date of January 2006. The Arsenic Rule revises the arsenic MCL
downward to 0.010 mg/L and identifies several best available treatment technologies for
compliance. Compliance with the new MCL is based on the running annual average of
monitoring results at each entry point to the distribution system. The rule makes arsenic
monitoring requirements consistent with monitoring for other IOCs regulated under the
Phase IIIV standardized monitoring framework. However, if arsenic is detected above the
MCL in any individual sample, the system must increase the frequency of monitoring at
that sampling point to quarterly.
Bremerton Status
A review of historical IOC monitoring data indicates that all existing City water sources
(both in the main system and the West 517 Zone) have arsenic concentrations less than
half of the new MCL. Because of this, it is expected that the new arsenic rule will not
impact the City.
4.4.3 Radionuclides Rule
Regulatory Elements
1 ne original Radionuclloes Rule went into effect in 1978. The rule was reviseo III
December 2000, with an effective date of 2003. The revised rule applies only to CWSs,
and according to WAC 246-290-300.10, DOH has adopted the federal rule without
Water Quality Review and Regulatory Compliance
4-6
2005 City of Bremerton Water System Plan
additional regulation of NTNC water systems. Therefore, the rule has no impact on the
West 517 system.
The revised rule includes MCLs for radium-226 and radium-228, referred to as combined
radium (5 pCi/L), adjusted gross alpha emitters (15 pCi/L), beta and photon emitters
(4 mremlyear), and uranium (30/lg/L). Under this rule, monitoring for radionuclides
must be conducted at each entry point to the distribution system.
The revised rule also allows for eliminating the analysis of radium-226 and uranium if the
gross alpha results are less than or equal to 5 and 15 pCi/L, respectively. The required
monitoring frequency will be determined by DOH based on contaminant levels.
Bremerton Status
The City has a Monitoring Plan for Radionuclides. The City collected gross alpha
samples for all main system entry points except T-4 (Well 9) during 2003 and
grandfathered these datato reduce new monitoring requirements (note that Well 14 was
considered part of entry point T - 3 during the 2003 monitoring but has since been
designated as T-5). Since all gross alpha results were below 5 pC ilL, the City is not
required to conduct radium-226 or uranium sampling at these sources. Testing for entry
point T -4 (Well 9) has resumed now that the well is back in service.
The City was also required to test for radium-228. Although federal regulations require
quarterly radium-228 sampling, DOH required that the City complete two sampling
events separated by approximately six months. The City is awaiting these results. DOH
will direct water systems regarding future radiological monitoring requirements.
Bremerton has not been designated vulnerable to beta particle aJld photon emitter
radioactivity and has not been required to monitor for these parameters.
4.4.4 Lead and Copper Rule
Regulatory Elements
Lead and copper are metals that may be found in household plumbing materials and water
service lines. Lead ingestion has been linked to several adverse health impacts, including
impaired physical and mental development in infants and children. Copper can cause
aesthetic issues in addition to acute and chronic health impacts. The Lead and Copper
Rule (LCR) establishes monitoring requirements, action levels, and compliance
requirements to control the levels of these constituents in drinking water. Under the LCR,
water systems are required to conduct monitoring at customers ' taps to determine if more
than 10 percent of homes meeting certain criteria exceed the lead and copper action levels
of 0.015 mg/L and 1.3 mg/L, respectively. The LCR specifies required actions for
systems exceeding the 90th percentile levels. In January 2000, EP A published minor
revisions to the LCR. The purpose of the Lead and Copper Rule Minor Revisions
(LCRMR) was to eliminate unnecessary requirements, reduce monitoring and reporting
burdens, and promote consistent national implementation.
Water Quality Review and RegulatOlY Compliance
4-7
2005 City of Bremerton Water System Plan
Bremerton Status
Main System
The City has remained in compliance with the LCR action levels since corrosion control
facilities were installed in March 1999. The facilities, which are located at the entrance to
Reservoir 4, include a caustic soda feed system to raise the finished water pH above 7.7
prior to distribution. Since 2001, the City has raised its finished water pH target range to
between 8.4 and 8.6 to help minimize the formation of certain disinfection byproducts
within the distribution system.
Between 1999 and 2000, the City completed two rounds of post-treatment lead and
copper monitoring at 60 customer taps. In each round, the 90th percentile results were
below the lead and copper action levels; therefore, the City became eligible for reduced
tap monitoring (i.e., 30 samples per event). The City completed two rounds of reduced
tap monitoring in July 2001 and July 2002, respectively, and the 90th percentile results
remained below the action levels. Since 2002, the City has been required to conduct
reduced monitoring at customer taps once every three-year cycle. The most recent round
of tap monitoring was performed during the first half of 2005, and the 90th percentile
results were 0.005 mg/L for lead and less than 0.2 mg/L for copper. Lead and copper
monitoring results since 1999 are summarized in Table 4-3. The next round of customer
tap sampling is scheduled for 2008.
Table 4-3
Main System Lead and Copper Rule Monitoring Results
# of 90th Percentile Result (mg/L)
Sampling Date Samples Lead Copper
(Action Level 0.015) (Action Levell.3)
September 1999 60 0.010 0.26
June 2000 60 0.013 0.22
July 2001 32 . 0.002 <0.2
July 2002 33 0.007 <0.2
First Half2005 30 0.005 <0.2
The City is also been required to complete Water Quality Parameter (WQP) monitoring
for pH at the system entry point and at several locations within the distribution system.
Entry point pH samples are required at minimum biweekly at the outlet of Reservoir 4.
Under the regular schedule for pH monitoring within the system, the City is required to
conduct tworounds with at least 10 distribution samples during each six-month period.
In 2004, DOH approved the City's recommendation for optimal WQP (OWQP), which
included a minimum entry-point pH of 7.7 and minimum distribution system pH of 7.1.
The City collected 17 entry point pH samples and two rounds of at least 10 distribution
system samples during each six-month period in 2005. All samples were in agreement
with the OWQP; therefore, the City qualified for reduced monitoring.
Water Quality Review and Regulatory Compliance
4-8
2005 City of Bremerton Water System Plan
West 517 Zone
Following designation of the West 517 Zone as a separate small water system in 2001,
the City performed two rounds of monitoring for lead and copper, with 10 customer taps
sampled each round. As shown in Table 4-4, the 90th percentile results were well below
the respective action levels, thus qualifying the West 517 Zone for reduced monitoring.
In addition, since the 90th percentile lead results were less than or equal to 0.005 mglL
and the 90th percentile copper results were less than or equal to 0.65 mglL, the West 517
Zone qualified for accelerated reduced monitoring. The accelerated reduced monitoring
requirements require the collection of five tap samples once every three-year cycle. The
City completed monitoring in July 2005, and the next round of tap sampling is scheduled
for 2008.
No requirement exists for WQP monitoring at entry points or within the distribution
system, since the West 517 Zone has remained compliant with lead and copper action
levels and is considered a small system.
Sampling Date # of 90th Percentile Result (mgfL)
Samples Lead Copper
(Action Level 0.015) (Action Level 1.3)
September 2001 10 0.005 <0.2
February 2001 10 0.004 <0.2
July 2005 5 0.0038 <0.2
Table 4-4
West 517 Zone Lead and Copper Rule Monitoring Results
4.4.5 Wellhead Protection Program
Regulatory Elements
According to WAC 246-290-135(3), public water systems are required to implement a
Wellhead Protection Program (WHPP) to protect their groundwater supplies. Source
water protection programs are planning tools to be used by water utilities to identify
potential sources of water contamination and to protect existing and future drinking water
supplies. The objective is to minimize risk of accidental releases of contaminants in areas
contributing water to the public water supply system. The three basic elements of a
source water protection plan are:
. Definition of the Wellhead Protection Area (WHP A) for the area of recharge directly
contributing to a water supply. A WHP A is defined as an area contributing to a
source 'vvithin a.specified ~mount of time.
o Inventory of land uses and identification of potential sources of contamination within
the WHP A or watershed.
. Management strategies including emergency spill response and contingency plans to
minimize or eliminate the possibility of potential contamination of the water supply.
Water Quality Review and RegulatOlY Compliance
4-9
2005 City of Bremerton Water System Plan
Bremerton Status
In 1996, the City prepared a WHPP for its well supplies in the Gorst Creek basin,
Anderson Creek watershed, and Manette peninsula. As part of this effort, the City
developed a conceptual hydrogeologic model for each of the aquifers, completed
vulnerability assessments, determined the time of travel zones for each source using the
EP A General Particle Tracking (GPTRAC) method, initiated the formation of a
countywide Wellhead Protection Committee (Kitsap County Groundwater Guardians),
delineated the WHP As for each source, completed inventories of potential contaminant
sources, and notified those sources regarding their inclusion in a WHP A. The City has
continued to survey the WHP A every two years for contaminant occurrence, and the
Critical Areas Ordinance limits potentially contaminating activities within the WHP As.
Regarding emergency planning, contamination of an individual aquifer could impact
Bremerton's supply capabilities. However, the aquifers utilized by Bremerton's wells are
separated hydrogeologically, and contamination would likely be contained to a single
aquifer. The contingency plan for such an emergency would be to use supplemental well
sources, apply for emergency water rights on Wells 21 and 22, and rely more on the
surface water source in the interim.
4.4.6 Total Coliform Rule
Regulatory Elements
The Total Coliform Rule (TCR) requires water systems to monitor their distribution
system for the presence of coliform bacteria, a surrogate used to indicate possible
contamination from fecal bacteria. The City performs monitoring as outlined in its
existing Coliform Monitoring Plan and Addendum to Bremerton Coliform Monitoring
Plan, the latter created specifically for the West 517 Zone. Monitoring is required at
representative sites on a monthly basis, with the sample quantity dependant on the size of
the population served. Community water systems with service populations between
50,001 and 59,000 (e.g., main system) are required to take 60 representative samples
monthly throughout the system. Non-community water systems with service populations
between one and 1,000 (e.g., West 517 Zone) are required to take one representative
sample from the system if no coliform detection existed during the previous month and
five representative samples if any coliform was detected during the previous month. All
samples testing positive for total coliform must be followed by repeat sampling and
additional testing to determine if E. coli is present.
The Surface Water Treatment Rule (SWTR) and WAC 246-290-694(3)(a) include several
additional provisions for coliform monitoring in unfiltered surface water systems. These
~n,...lll,-1~ thP f"'"r\lL::a.,...t-1r\n Af r\~~ f"'"^1;-t^~ Co:l.'tn~l~ TlPar th. po first cpr"1r"'p {"'o("\nnp-rot1f\,n P-:lroh rl";"f
J,..l.l.V.l.U'U.'-' .L.l.lV VV.l.l""'-'L.lV.l.l VL V.lJ.,"" VV.LJ..I..V.I..I..l.J. U'u.J.J...Ip V .lA-V .1 L.L...... .L.l L '"'VI. V.1VV VV.lll.lVVL.lUJ.J. VUY.lJ. '-1-uy
the source turbidity exceeds 1.0 NTU, the colleCtion of one fecal coliform sample from
the surface supply each day that the turbidity exceeds 1.0 NTU, and the collection of one
coliform sample at the entry point to the distribution each day that routine or repeat
coliform samples are collected from within the system. According to the SWTR, surface
water fecal coliform sampling is also required at least five days per week. This
Water Quality Review and Regulatory Compliance
4-10
2005 City of Bremerton Water System Plan
requirement is further addressed later in the description of the Surface Water Treatment
Rules.
Under the TCR, two types of violations exist: acute and non-acute. An acute MCL
violation for coliform is based on the presence of either fecal coliform or E. coli in a
repeat sample or coliform presence in a repeat sample collected as a follow-up to a
sample indicating the presence of fecal coliform or E. coli. A non-acute MCL violation
for coliform occurs under the following conditions: a system collecting 40 or more
coliform samples per month (corresponding to a service population of at least 33,001) has
more than 5 percent of the routine samples taken in one month test positive for the
presence of total coliform, or a system collecting fewer than 40 coliform samples per
month has more than one coliform detection.
Bremerton Status
Main System
The City collects at least 60 routine coliform samples per month at locations throughout
the main system, as well as entry-point coliform sampling each day that routine or repeat
samples are collected. Of the 4,687. routine distribution system samples collected from
2000 to 2005, only 29 samples (0.7 percent) tested positive for coliform. Of these, four
tested positive for E. coli. In all cases, the City collected repeat samples in accordance
with the provisions of WAC 246-290-320, and none confirmed the coliform presence
indicated in the routine samples. The City also complied with the requirements to collect
source water fecal coliform and system entry-point coliform samples on days when the
maximum turbidity exceeded 1.0 NTU. No acute or non-acute violations existed during
this period.
West 517 Zone
The City typically collects two routine system samples per month from the West 517
Zone (unless a positive coliform detection existed the previous month, in which case the
City collects five routine samples). Of the approximately 120 routine distribution system
samples collected from 2001 to 2005, no samples tested positive for coliform or E. coli.
No acute or non-acute violations occurred during this period.
4.4.7 Surface Water Treatment Rules
Regulatory Elements
The Surface Water Treatment Rule (SWTR) was issued in 1989 and applies to water
systems using surface water or groundwater under the influence of surface water (GUI).
The SWTR addresses filtration, disinfection, and regulation of Giardia lamblia, viruses,
Legionella, heterotrophic plate count (HPC) bacteria, chlorine residual, and turbidity
levels of finished water. As an unfiltered system, the City is required to comply with the
filtration avoidance criteria addressed in WAC 246-290-690, which inciudes source water
monitoring and quality requirements, disinfection criteria, watershed control and
protection requirements, and monitoring requirements.
Water Quality Review and RegulatOlY Compliance
4-11
2005 City of Bremerton Water System Plan
The Interim Enhanced Surface Water Treatment Rule (IESWTR) was issued in 2001 and
builds upon the SWTR without replacing it. For unfiltered surface supplies, the IESWTR
requires addition of Cryptosporidium to the watershed control program wherever Giardia
lamblia is mentioned. This includes the identification and monitoring of activities that
may impact microbial water quality. The IESWTR also includes disinfection profiling
and microbial benchmarking provisions based on system-wide disinfection by-product
(DBP) levels.
Watershed Control Program
The SWTR requires the development, documentation, and implementation of a watershed
control program (WCP) for unfiltered surface supplies. According to the requirements of
WAC 246-290-135(4), the WCP must address watershed hydrology and characteristics,
land ownership, activities that may adversely affect source water quality, security and
access-related issues, and monitoring provisions. Also, for unfiltered surface supplies,
DOH must complete a sanitary survey once every five years and annual on-site
inspections to ensure adequacy of the watershed control program. The WCP has been
updated with this WSP.
Source Water Quality Conditions
For unfiltered surface supplies, the SWTR requires source water monitoring of fecal
coliform density and turbidity. According to requirements in WAC 246-290-694, the City
must collect fecal coliform samples on at least five separate days each week, including
whenever the source water turbidity exceeds 1.0 NTU. To remain in compliance, the fecal
coliform density must be less than or equal to 20/1 00 mL in 90 percent of samples for the
previous six months, and the turbidity cannot exceed 5.0 NTU when the supply is used
unless DOH determines that the event was:
. The result of unusual or unpredictable circumstances or;
. No more than two events occurred in the last 12 months, or no more than five events in
the last 120 months.
The SWTR permits operational adjustments, including temporary source shutdown
during turbidity episodes, providing that alternate supplies and/or finished water storage
are available and can be used to meet system demands.
Compliance with the total coliform MCL is also a required component of the filtration
avoidance criteria unless it can be shown that the violation was not related to source or
treatment deficiencies.
n;"i... ro,;tinnllofl U;"OJn ont<;:
~.u....,~~..~.. ---"1n.. ~'''_'._~
For unfiltered surface waters, SWTR treatment requirements for Giardia lamblia and
enteric viruses must be met through disinfection. The disinfection requirements require
adequate CT (disinfectant concentration multiplied by contact time) be provided such that
3-log (99.9 percent) inactivation of Giardia ,lamblia and 4-log (99.99 percent)
inactivation of enteric viruses is achieved each day, resulting in inactivation ratios greater
Water Quality Review and Regulatory Compliance
4-12
2005 City of Bremerton Water System Plan
than or equal to one. Regarding Cryptosporidium, the IESWTR required a minimum of2-
log (99 percent) removal for filtered systems but did not impose any removal or
inactivation requirements for unfiltered systems.
System Water Quality Conditions
After treatment, the SWTR requires a minimum disinfectant residual of 0.2 mglL at the
point of entry to the distribution system at all times. Additionally, a detectable
disinfectant residual must be present in at least 95 percent of all distribution system
samples collected at the same time and location as coliform samples, according to WAC
246-290-451. Alternatively, samples may be analyzed for heterotrophic plate count
(HPC) bacteria. An HPC level of 500 colony forming units per milliliter (cfulmL) or less
is considered equivalent to a detectable disinfectant residual.
Bremerton Status
The City does not regularly pump surface water through the intertie to the West 517 Zone
and only uses it when CTs are met at Pump Station 3. Therefore, regulations pertaining to
the surface supply only apply to the main system. Since 1992, Bremerton has successfully
maintained its non-filtration status under the SWTR. The source waters utilized by the
City are excellent based on the following facts:
· Surface water quality continues to meet the requirements for filtration avoidance, and
· All groundwater sources appear to be hydraulically isolated from the influence of
surface water.
Table 4-5 provides a summary of the City's compliance status with regard to SWTR
requirements. These items are further discussed in the following sections.
Since the last WSP update in 1999, the following major changes and/or improvements to
the watershed, McKenna intake facilities, treatment (screening, chlorination), and/or
transmission have been made:
· The Utility contracts with the Bremerton Police Department for after hours facility
inspections;
· Seismic bracing of the dam intake tower; and
· Security upgrades to various facilities in response to post 9-11 concerns.
Water Quality Review and Regulatory Compliance
4-13
Table 4-5
Surface Water Treatment Rule Criteria for Filtration Avoidance
Parameter Criteria Bremerton Status
Turbidity Sample for turbiditYPlior to disinfection every 4 hours the system serves the public or continuously with City samples continuously.
State permission.
System is out of compliance any time the turbidity level exceeds 5.0 NTU unless State detennines high Automatic system shutdown prevents water with
Turbidity turbidity caused by unusual or unpredictable circumstance, no more than two events occun'ed in past 12
months, or no more than five events occul1'ed in past 120 months elevated tUlbidity from entering distIibution system.
.
Turbidity/Colifonn Every day the turbidity measurement exceeds I NTU, the system must take colifolm measurements before City in compliance.
the first customer is served.
Cohlonn Must comply with limits on fecal colifonn for source water' (fecal colifonn:::: 20/1 00 mL in 90 per'cent of City in compliance,
samples for previous 6 months this systern served public
.
Meet disinfection requirements including specified CT times for 99.9 per'cent inactivation of Giardia lamblia
Disinfection cysts and 99.99 per'cent inactivation of enteric viruses. CT requirements vary depending upon water' City in compliance,
ternper-ature and pH
Disinlection CT lor system must be calculated daily based upon peak daily flows to deterlnine contact times City in compliance.
Disinfection system redundant components include an auxilimy power supply or an automatic shut-off of
Disinfection water to the distribution system whenever there is less than 0.2 mglL of residual disinfectant at entrance to City has both provisions.
distlibution system
Water'shed Control Must maintain a watershed contml progl1lm to restrict human activities and the potential for contmnination Conducted according to DOH approved plan (last
by Gim'dia lamblia cystsand Cryptosporidium oocysts updated in 2006,)
Water'Shed Control Complete annual DOH water'Shed surveys, , and complete system sanit31Y surveys every five yeal'S Last DOH Sanit31Y survey conducted in Septernber'
2004.
WateJ'Shed Control Must have an annual on-site inspection to assess wateJ'Shed control progmm and disinfection treatment DOH perfonns annually.
process.
Water Quality Review and RegulatOlY Compliance
4-14
2005 City of Bremerton Water System Plan
Union River Watershed Control Plan
The City owns approximately 2,904 acres (98 percent) of the Union River watershed,
with the other 60 acres under outside ownership of Trinity Broadcasting and the
Department of Natural Resources. In 1996, the City completed Utility (Volume I) and
Forest (Volume II) Land Management Plans that address general management of City
owned land, including the Union River watershed. The City completed the City of
Bremerton Watershed Control Program to further define specific precautions taken to
protect the watershed. The WCP, which was approved by DOH, addresses watershed
hydrology, characteristics, land ownership, and security/access protocol. The original plan
was designed to address the 1989 SWTR and its provisions adopted by DOH regarding
requirements for remaining an unfiltered source (WAC 246-290-690). Those provisions
provided for more detailed monitoring of activities within the watershed, restricted access
gates, and enhanced watershed patrol and enforcement. According to the requirements of
the IESWTR, the WCP was updated in 2001 specifically to address control of
Cryptosporidium. The most recent update to the WCP was in 2006.
Union River Watershed Water Quality
The City collects Union River water supply samples for determination of fecal coliform
density according to the monitoring requirements in WAC 246-290-694. Owing to the
high quality of the surface supply, the City has maintained compliance with the filtration
avoidance criterion that at least 90 percent of samples over any running six-month period
have fecal coliform concentrations less than 20/100 mL. The observed frequencies of
fecal coliform concentrations below 20/1 OOml for the Union River System Intake
(consisting of the main stem with the seasonal addition of the West Branch) since 2000
has have averaged 97.6% percent, while the minimum six-month period was 95.5%
percent.
The City conducts continuous on-:line monitoring of raw water turbidity at the McKenna
Falls Intake facility during periods when the surface supply is in use. Figure 4-1 depicts
the maximum daily turbidity observations from January 2002 through December 2005.
Over this period, the maximum daily turbidity was less than 1.0 NTU rougWy 86 percent
of the time. No occasions occurred where the delivered water exceeded 5.0 NTU. The
City does have automatic intake shutdown capabilities should the source turbidity
approach 5.0 NTU. Bremerton generally shuts down at turbidities much less than this.
Water Quality Review and Regulatory Compliance
4-15
2005 City of Bremerton Water System Plan
30
Maximum Daily Turbidity of the Union River Water Supply
2.5
2.0
S
E-
~
..q15
"0
:0
...
"
E-
1.0
I I
I' i II I ! ,I
JIll I r, ,I
~~ljJ~ '
I ~flj~J
I "H)4
), ~l
NI il
H
t'l ~
, iill!
i ~ ~ IU!l
'! ~ 111~
II ~ If ii
J ~j~ ,~! ~.~
, I ,,,,,,' "
'i .ilr""i I'
I,' ~l,]- '-!~ '
4LI,)i;!~V ~"'" ,l
~i!!jf1~W , I
I I
i
I;
! i I
i i i
i i j i
I \ \ ~ '
G..,. ! I
III i Jj
II Iii I III I ~~ i"JIII
d I : ~ 11!ill!' I ' ~~!~ ~
III,', iJ,IJMIII"II~,\,~~Ji ,1.1 11m'l! t~
If~ ~, .'!,II~'J1, ;''l.i!~ ~'I' 1'~
11111 1~1 ~r 'w" ,
1 I rl I
I
;
I~i II!
'i ii,
I!ii!
,',-.,'-' 'I .
r ~I I! I! i
ill r~i Iii I
I"', ", '1'1~~!11
ill "1 ! \
Iii " ~"~!~I'
.11 ,\!,
III, ~i
0.5
0.0 ,
1/02
4/02 7/02
10/02
1/03
4/03 7/03 10/03 1/04 4/04 7/04 10/04
1/05 4/05
7/05
10/05
Figure 4-1
The City also performs voluntary environmental monitoring at several locations within
the Union River watershed in order to characterize water quality trends and ensure the
adequacy of its watershed control program. Monitoring is performed according to the
Monitoring Plan for the Union River Reservoir (last updated July 2004). A variety of
parameters, including nutrients, total organic carbon (TOC), algae, phyto- and zoo-
plankton, and physical characteristics, are assessed monthly.
Disinfection
The City feeds chlorine gas at McKenna Falls (and Wells 17 and 20) for primary
disinfection within the McKenna transmission pipeline. The disinfection compliance
point for the surface supply is the entrance to Reservoir 4. The City monitors chlorine
residual, pH, and temperature at four locations along the transmission main and uses
these data along with peak hourly flow measurements for each segment to determine the
overall CT achieved en route to Reservoir 4. Based on a review of daily CT profiles since
January 2002, the City has provided overJ-logGiardia lamblia inactivation each day the
surface supply was in use, with typical inactivation ratios between 2 and 6. The CT
required for 4-log inactivation of viruses is much less than that for 3-log Giardia lamblia;
therefore, the City has maintained compliance with both requirements.
System Water Quality
The City adjusts the chlorine feed rate to provide a target residual of 1.1 to 1.4 mglL at
the entrance to the distribution system at Reservoir 4. Experience shows that this target,
Water Quality Review and Regulatory Compliance
4-16
2005 City of Bremerton Water System Plan
along with individual dose targets for each of the chlorinated well supplies, has been
adequate to ensure a detectable chlorine residual throughout the system. The City also
maintains an automated system to shut down the surface intake if the residual drops
below a low-level set point, ensuring compliance with the 0.2 mg/L entry-point
requirement.
The City monitors chlorine residual within the distribution system at least once per day
and at the same time and location as routine and repeat coliform sampling. Based on a
review of daily monitoring records from January 2002 through December 2005, the City
performs an average of 77 chlorine residual samples per month. For all months during
this period with the exception of September 2004, all samples contained a detectable
residual and/or an HPC level below 500 cfu/mL. In September 2004, two of 97 samples
(2 percent) contained no residual and had HPC levels above 500 cfu per mL, which is still
in compliance with the requirements. Therefore, the system has remained in full
compliance with the distribution system water quality requirements of the SWTR.
4.4.8 Stage 1 Disinfectants/Disinfection By-Products Rule
Regulatory Elements
Disinfection by-products (DBPs) result from the reaction of natural organic matter
(NOM) and various inorganic precursors with chemical disinfectants. Toxicological
research has shown that many DBPs have carcinogenic and other adverse properties when
ingested for long periods of time. In 1979, the EPA enacted the Total Trihalomethane
Rule, which set an interim MCL for total trihalomethanes (TTHM) of 0.1 mg/L as a
running annual system-wide average based on quarterly monitoring within the
distribution system. This rule applied to water systems using a chemical disinfectant and
serving over 10,000 customers.
In 1998, the EP A promulgated the Stage 1 Disinfectants/Disinfection By-Products
(D/DBP) Rule to further reduce the DBP levels in drinking water. The Stage 1 D/DBP
Rule, which applies to all CWS and NTNC water systems that apply a primary or
secondary chemical disinfectant to their water supply, became effective in January 2002
for large systems (those serving 10,000 or more people) and January 2004 for small
systems (those serving less than 10,000 people).
The Stage 1 D/DBP Rule established new MCLs for chlorite, bromate, and the sum of
five haloacetic acids (HAAS) (0.060 mg/L) and established maximum residual
disinfection levels (MRDLs) for chlorine (4.0 mg/L), chloramines, and chlorine dioxide.
It also lowered the MCL for TTHM (0.080 mg/L) and set total organic carbon removal
requirements for systems using conventional filtration.
The DBP monitoring requirements under the rule depend on the system size (large or
small) and source of supply (surface water or groundwater). For the main system, which
is considered a large surface water system under the rule, routine monitoring
requirements include the collection of four paired (i.e., both TTHM and HAAS) samples
per quarter per plant (i.e., designated entry point) operated any time during that quarter.
Water Quality Review and Regulatory Compliance
4-17
2005 City of Bremerton Water System Plan
At least 25 percent of all samples collected each quarter must be from locations
representing maximum residence time in the system. The remaining samples must be
taken at locations representing average residence time in the distribution system and
representing the entire system, taking into account number of persons served, different
sources of water, and different treatment methods.
For the West 517 Zone, which is considered a small groundwater system under the rule,
routine monitoring requirements include the collection of one paired sample per year per
plant (i.e., designated entry point) during the month of warmest water temperature at a
location of maximum residence time. Compliance with the respective MCLs is
determined based on the running annual arithmetic average (RAA) of quarterly averages.
Quarterly averages are determined using a flow-weighted average of individual plant
averages.
For both the main system and the West 517 Zone, chlorine residual samples must be
collected at the same time and location as coliform samples. Compliance with the
chlorine MRDL is based on theRAA, computed quarterly, of monthly averages of all
samples from each system.
Reduced monitoring is permitted under the rule if the RAA of TTHM and HAA5 results
drop below 0.04 mglL and 0.03 mglL, respectively, over a 12-month sampling period.
However, full sampling must be re-implemented if RAA TTHM levels exceed 0.06 mglL
or HAA5 levels exceed 0.045 mglL.
Bremerton Status
Main System
Prior to implementing the Stage 1 D/DBP Rule, the City submitted to DOH a technical
report entitled, Determination of "Treatment Plant" for Compliance with the Federal
Disinfectants/Disinfection Byproducts Rule. This report provided justification for the use
of the four plant designations T -1 through T -4 (See Table 4-1 ). Well 14 was considered
part of plant T-3 (rather than T-5), since it draws from the Manette Sea Level Aquifer
along with Well 13. For each of the plant locations, four distribution sample locations,
one representing maximum residence time and three representing average residence time,
were selected using zones of influence determined from the Bremerton water system
model.
The City began quarterly monitoring under the rule in January 2002 in accordance with
its Monitoring Plan for Compliance with the Disinfectants/Disinfection Byproducts Rule
(last updated August 2004). After the first quarter of 2003, the RAAs for TTHM and
U 11 A ~ . nrC>orp r\ 0'1' 1 ~o-jT' '0nA lco.C'S thr:ln '~'o+C>ol"tr)~lD T'CH"'__CU-..t~"'TL::.l'T T"ha-ro+r'\.....L::lo. t"hDo r~t"(,
.J..Lll.....l ~-' VVv......... v.v...!.l .u...lElJ...J_ u..l~U .Lv.,:) _ .u~u..l~ UVL'-'VLULJ.l':',.. 1.V':>'pv.\";uV~.lJ. ~.l.l\".ll,""J.V.lv, l.lJ...... \.......-l~y
qualified for reduced monitoring, which has required the collection of one paired TTHM
and HAA5 sample per quarter per plant taken at the location representing maximum
residence time. The City has remained on the reduced monitoring schedule since April
2003.
Water Quality Review and Regulatory Compliance
4-18
2005 City of Bremerton Water System Plan
Figure 4-2 depicts the main system monitoring results for TTHM and HAA5 since
January 2002. The City has continued to meet both the Stage 1 MCLs as well as the
levels necessary to remain on the reduced monitoring schedule. The maximum RAA for
TTHM (0.051 mg/L) and HAA5 (0.036 mg/L) occurred in the first quarter of 2004. The
highest single TTHM observation (0.073 mg/L) occurred at the maximum residence time
for plant T-1 in the third quarter of 2004. The highest single HAA5 observation (0.066
mg/L) occurred at the maximum residence time for plant T-2 in the second quarter of
2003.
Main System Disinfection Byproduct Monitoring Results
100
80
::r ):
c, 60 .
.-3- ~\
:!: is. \
:I: 40 fa/f \\\
1=
20 '<'''./ '
'. .
0
N N N N M M M M ~ ~ ~ ~ on on on on
0 cr cr 0 0 cr cr 0 0 cr s: 0 0 cr cr cr
~ .... "3 ..!. ~ .... "3 ..!. ~ 0. ..!. ~ 0. "3 (5
0- <.) 0- <.) ;::l <.)
>-, -<C >-, 0 >-, -<C >-, 0 >-, -<C >-, 0 >-, -<C >-, 0
1- M CL --0-- RAA -/lr- T-1 --.g-- T-2 .... T-3 ;( T-4!
::r
en
..;:l.
10
<(
<(
:I:
0
N N N N M M M M ~ ~ ~
0 cr s: 0 0 cr s: cr 0 cr s:
~ ..... ..!. .~ .... (5 ~ ....
0- ;::l <.) 0. ;::l 0. ;::l
>-, -<C >-, 0 >-, -<C >-, 0 >-, -<C >-,
..;- on
o 0
t> ~
o >-,
on on
9 :I
0. ;::l
-<C >-,
on
o
..!.
<.)
o
I
!
I
I
I
I
i
I
I
;
J
i - MCL-.:..o- RAA-&- T-I -m- T-2 -+- T-3
;( T-4:
;
I=i......." .lL?
. .~_...... --..--
Water Quality Review and Regulatory Compliance
4-19
2005 City of Bremerton Water System Plan
The City collects an average of 77 distribution system chlorine residual measurements
each month from the main system, with individual sample results ranging from non-detect
to 1.2 mg/I. Since January 2002, the main system chlorine RAA has varied between 0.6
mg/L and 0.79 mg/L; therefore, the City has remained in compliance with the chlorine
MRDL.
West 517 Zone
For the purposes of Stage 1 DBP monitoring and compliance, Wells 15, 18, and 19 are
considered to be a single plant, since they all draw from the same aquifer. The monitoring
requirements became effective for this system in January 2004, as it serves less than
10,000 people. The City collects its annual samples in August, the month of warmest
water temperature and has met the respective MCLs during both 2004 and 2005
sampling. In August 2004, the TTHM and HAA5 results were 0.0058 and 0.0037 mg/L,
respectively. In August 2005, the TTHM and HAA5 results were 0.004 mglL and non-
detectable, respectively.
The City collects an average of two distribution system chlorine residual measurements
each month from the West 517 Zone, with individual sample results ranging from 0.19 -
to 1.44 mg/L. Since January 2002, the West 517 Zone chlorine RAA has varied between
0.6 mg/L and 1.06 mg/L; therefore, the City has remained in compliance with the chlorine
MRDL.
4.4.9 Consumer Confidence Reports and Public Notification Rule
Regulatory Elements
Under the Consumer Confidence Report (CCR) Rule promulgated in 1998, water systems
are required to provide an annual CCR on the source of their drinking water and levels of
any contaminants found. According to WAC 246-290-72001, these reports are only
required of community water systems and do not apply to the West 517 Zone. The annual
report must be supplied to all customers and must include:
· Information on the source of drinking water
· A brief definition of terms
· If regulated contaminants are detected, the MCLG, MCL, and the level detected
· If an MCL is violated, information on health effects
· If EP A requires it, information on levels of unregulated contaminants
WAC 246-290-72001
While the CCR provides annual "state-of-the-water" reports, the Public Notification Rule
(PNR) directs utilities in notifYing customers of acute violations when they occur. The
PNR was revised in May 2000 and outlines public notification requirements for violations
of MCLs, treatment techniques, testing procedures, monitoring requirements, and a
variance or exemption. If violations have the potential for "serious adverse effect,"
Water Quality Review and RegulatOlY Compliance
4-20
2005 City of Bremerton Water System Plan
consumers and the State must be notified within 24 hours of the violation. The notice
must explain the violation, potential health effects, corrective actions, and the need for
consumers to use an alternate water source. Notice must be made by appropriate media or
posted door-to-door. Less serious violations must be reported to consumers within 30
days in an annual report or by mail or direct delivery service within one year, depending
on the severity of the violation.
Bremerton Status
The City's first CCR was distributed in October 1999. As required, the City has
distributed CCRs to its customers prior to July 1 each year since 1999. The City's 2005
CCR is located on-line at http://www.ci.bremerton.wa.us
4.4.10 Operator Certification
The 1996 SDW A amendments require that states develop and implement an operator
certification program. The regulation sets out minimum guidelines for such a
certification program, including operator classification and qualifications. These sections
of the regulation require that:
· Each treatment facility and/or distribution system be placed under the direct supervision
of a certified operator;
· Operator certification must be equal to or greater than the system classification being
operated;
· At least one certified operator be available on every shift;
· Operators must pass a validated exam demonstrating skills, knowledge, ability, and
judgment necessary for the system classification; and
· Each operator has a high school diploma, GED, or State approved experience and
training.
While the responsibility for developing the program lies with DOH, systems such as
Bremerton are required to bring all operators up to the level of certification as required.
Bremerton Status
As discussed in Chapter 6, Operation and Maintenance Program, all water system
managers, supervisors, and operators have the appropriate water certification from DOH.
4.5 Promulgated Water Quality Regulations
Recent water quality regulations applicable to the City are listed in Table 4-6. A discussion of
each rule follows.
Water Quality Review and RegulatOlY Compliance
4-21
2005 City of Bremerton Water System Plan
Long Term 2 Enhanced Surface Cryptosporidium Promulgated: January 2006
Water Treatment Rule Effective: March 2006
Stage 2 Disinfection By-products T rihalomethanes, Haloacetic Promulgated: January 2006
Rule Acids Effective: March 2006
Table 4-6
Promulgated Rules Under the Safe Drinking Water Act
4.5.1 Long Term 2 Enhanced Surface Water Treatment Rule
Regulatory Elements
The Long Term 2 Enhanced Surface Water Treatment Rule (LT2ESWTR) was published
in the Federal Register on January 5, 2006. The rule was developed as part of the Stage 2
Microbial/Disinfection By-Products cluster, which was intended to improve public health
protection against waterborne pathogens, specifically Cryptosporidium, while addressing
risk trade-'-offs associated with exposure to chemical disinfectants and DBPs. The
LT2ESWTRappliesto public water systems that distribute or wholesale surface water or
groundwater under the direct influence of surface water (e.g., Subpart H systems). It
builds upon, without replacing, the requirements of the SWTR and IESWTR.
The LT2ESWTR seeks to lower the concentration of Cryptosporidium in finished
drinking water supplies to less than one oocyst per 10,000 liters. The approach involves
the identification of source water vulnerability to Cryptosporidium occurrence and
implementation of treatment and control strategies appropriate to the level of risk. For
the first time, the LT2ESWTR imposes Cryptosporidium treatment requirements for
unfiltered surface water systems. This was mandated to ensure a comparable level of
public health protection similar to filtered systems. The rule also contains requirements
for disinfection profiling and benchmarking as well as measures to protect uncovered
finished water storage reservoirs from contamination risks.
The key elements of the rule applicable to the City of Bremerton include:
· Initial source water monitoring
· Determination of mean Cryptosporidium concentration
· Disinfection profiling and benchmarking
· Implementation of treatment options from the microbial toolbox
· Future source water monitoring
/nitialSource Water Monitoring
Under the L T2ESWTR, surface water systems that serve 10,000 or more people (e.g.,
large systems) must conduct monthly source water monitoring of Cryptosporidium for 24
consecutive months. Historical data may be "grandfathered," providing they meet specific
eligibility requirements established in the rule.
Water Quality Review and Regulatory Compliance
4-22
2005 City of Bremerton Water System Plan
Disinfection Requirements
The LT2ESWTR requires that unfiltered surface water systems provide Cryptosporidium
treatment via disinfection. The level of inactivation required is either 99 percent (2-log)
or 99.9 percent (3-log), depending on the mean oocyst concentration determined from the
initial source water monitoring period. Unfiltered systems will be required to use
chlorine dioxide, ozone, or ultraviolet (UV) irradiation to meet the Cryptosporidium
inactivation requirement and at least two separate disinfectants in order to meet the
combined Cryptosporidium, Giardia lamblia, and viral inactivation requirements. Each
disinfectant must be able to achieve the total inactivation required for Cryptosporidium,
Giardia, or viruses separately.
Disinfection Profiling
Disinfection profiling involves tracking the inactivation of specific pathogens over a
period of time. The LT2ESWTR includes disinfection profiling and benchmarking
requirements to ensure water systems maintain adequate protection against microbial
pathogens as they take steps to simultaneously comply with the Stage 2 DBP Rule. Water
systems will be required to develop Giardia and virus disinfection profiles and calculate
microbial benchmarks if they plan to make a significant change to their disinfection
practice following the initial source water monitoring period. A significant change is
defined as moving the point of disinfectant application, changing the disinfectant, and/or
changing the disinfection process.
Future Source Water Monitoring
Water systems will be required to conduct additional monitoring in the future to confirm
or revise the initial assessment of source water quality. The additional monitoring will be
required beginning six years after initial bin classification. Over the next several years,
the EP A may modify the sampling or analytical requirements from those required for the
initial round of monitoring. )
Bremerton Status
The City of Bremerton will need to comply with the LT2ESWTR for its Union River
Supply according to the schedule established for water systems serving 50,000 to 99,999
people. Since the Main Stern and West Branch supplies are blended prior to collection
and treatment, they are considered a single source under the rule.
Initial Source Water Monitoring
As part of its Watershed Control Program, the City has been periodically monitoring
source water at the Union River reservoir for Cryptosporidium since 1994. Generally,
between two and four samples are collected each year. Since sampling is not performed
monthly, the historical Cryptosporidium data will not be acceptable for grandfathering.
Therefore, the City will be required to either complete 24 months of source water
monitoring (beginning no later than April 1, 2007) or submit its intent to provide 3-log
Cryptosporidium inactivation (assuming it retains its unfiltered status). The City will be
Water Quality Review and Regulatory Compliance
4-23
2005 City of Bremerton Water System Plan
required to develop a source water sampling schedule and provide it to the EP A no later
than January 1, 2007.
The estimated analytical cost for each Cryptosporidium sample is $450 (year 2006 $).
Assuming 24 source water samples plus two required matrix spikes are collected, the cost
to complete initial monitoring is estimated at $12,000.
In November 2005 (prior to promulgation of the final rule), the City prepared a draft Long
Term 2 Enhanced Surface Water Treatment Rule Monitoring Plan. The plan will be
reviewed and updated as necessary to ensure it conforms to the requirements of the final
rule.
Disinfection Requirements
The City currently uses only chlorine disinfectant to meet the SWTR inactivation
requirements for Giardia lamblia and virus. If it elects to keep the Union River supply
unfiltered, the City will be required to implement an additional disinfectant (chlorine
dioxide, ozone, or UV irradiation) for Cryptosporidium inactivation. Each disinfectant
must be able to achieve the total inactivation required for Cryptosporidium, Giardia
lamblia, or viruses separately. The City must have the new disinfection facilities installed
and on-line no later than October 2012 unless a separate compliance agreement is
negotiated with DOH. As part of this WSP update, the City is evaluating approaches to
comply with the additional Cryptosporidium treatment requirements.
Disinfection Profiling
Although the City will be required to provide an additional disinfectant barrier to meet
the Cryptosporidium inactivation requirement, it would only be required to profile and
benchmark if it elected to modify its existing chlorination practices. The City currently
performs monitoring along the transmission pipeline leading from the McKenna Falls
intake to Reservoir 4 in order to determine Giardia lamblia inactivation and residual at
the system entry point. These data (and the calculated daily profiles) may be eligible for
grandfathering. The City would consult with DOH in advance of making any changes to
its existing chlorination practices.
4.5.2 Stage 2 Disinfectants/Disinfection By-Products Rule
The Stage 2 DBP Rule was published in the Federal Register on January 4,2006. The
rule was developed to provide more equitable protection against DBPs on a system-wide
basis by changing the compliance monitoring provisions. The Stage 2 DBP Rule applies
to community and NTNG water systems that serve drinking water treated with aprimary
Ar C"~r>^nrlan.r roh" O"1""Y\~,....t:ll r1-~~~~-tDor-t~-nt Tho S. fa. go. "") titi"[) D.....1a r1~DCI tho. +All"yn,;",rr--
V.i. .::>vvv lU ~J \,..1.1 vl.L.llvU.1 U.l0.l.1.1.LvVLUJ..1. .1. 11'-' l v ~ .L-'J.JJ. .L'\..U.1V uvv.::> l.l.lv .1.VJ.IV vv 111.5-
. Changes the method of calculating DBP regulatory compliance to a locational running
annual average (LRAA) of quarterly samples, in which the system calculates a
running annual average for each DBP monitoring location instead of calculating a
rulliling allilua1 average for the entire system.
Water Quality Review and Regulatory Compliance
4-24
2005 City of Bremerton Water System Plan
· Re-establishes the location and number of OBP monitoring sites. The rule requires
systems to conduct an Initial ~istribution System Evaluation (lOSE) to select Stage 2
OBP monitoring locations in areas of the distribution system with elevated OBP
levels. Additionally, the final Stage 2 OBP Rule requires systems to determine
monitoring requirements based on population.
· Establishes DBP operational evaluation levels for each monitoring site. These levels
are calculated as 25 percent of the sum of the two previous quarter's results plus twice
the current quarter's monitoring result. A system exceeding this level is required to
conduct an operational evaluation or evaluate their distribution system operations to
determine ways to reduce OBP levels. The system is required to notify the state of an
operational evaluation level exceedance and submit evaluation results within 90 days
of the exceedance.
· Requires consecutive systems purchasing drinking water carrying a disinfectant to
implement Stage 2 OBP requirements on the same schedule as the largest water
system in their combined distribution system.
The first step in complying with the Stage 2 OBP Rule is conducting an lOSE with the
goal to identify areas with routinely higher OBP concentrations than other areas in the
distribution system and use this information to select monitoring locations for long-term
Stage 2 OBP compliance monitoring. The lOSE requirement can be met in four ways:
. Very Small System Waiver - Systems serving less than 500 customers that qualify for
this waiver are exempt from IDSE requirements.
· 40/30 Certification - This approach allows systems to meet the lOSE requirement by
certifying that all individual Stage 1 TTHM and HAA5 compliance monitoring results
or equivalent OBP data collected over a specified 2-year period have met the
following criteria: TTHM :S 0.040 mg/L and HAA5 :S 0.030 mg/L. Systems must
submit the required documentation to the primacy agency.
. Standard Monitoring Program (SMP) ~ Systems conduct one year of monitoring in
the distribution system to identify high OBP locations and must submit a SMP Plan
and lOSE report to the primacy agency as part of the lOSE process.
. System Specific Study (SSS):
o
Using Existing Monitoring Oata - Systems can meet lOSE requirements using
existing monitoring data. The EPA has established criteria the existing data must
meet in order to be used to meet the SSS requirement. Systems must submit an
SSS Plan and/or lOSE Report to the primacy agency as part of the lOSE process.
o
tT~~~n u,~~.-f~o:l111~;" l\-if^d~l ~'(Tstems c~:'" rYlpp.t Tns")':; -ro.rn"'~""'Do.ynOr\tC" 11D~-nrT .-:. "'-1:7notDr
'-' ~J.J.J.b .1...1.. J \J.J. U.U..l..L"-' 1.1'.l.'-1 "-'.J. - U.J L .1..L..1. U.1J._ 1.1.1'-""-'''' .l...L...' .L.. 1. 'v"1 U-J.J. v.l.ll........l.ll.:J UL:>.L.l.l6' a vv U\..\...o.1
distribution system hydraulic model. The EP A has established criteria the
hydraulic model must meet in order to be used for lOSE compliance. Systems
must submit an SSS Plan and IDSE Report to the primacy agency as part of the
lOSE process.
Water Quality Review and Regulatory Compliance
4-25
2005 City of Bremerton Water System Plan
Consecutive systems purchasing some or all of their water from another system and
systems that sell water wholesale must comply with the Stage 2 DBP Rule on the same
schedule as the largest system in the combined distribution system. A combined
distribution system is the interconnected distribution system consisting of the distribution
systems of wholesale systems and consecutive systems receiving finished water from the
wholesale system(s). However, Stage 2 sampling requirements are based on the retail
population served by each individual system, not the combined distribution system. The
Stage 2 DBP Rule compliance schedule is shown in Table 4-7.
Table 4-7
Stage 2 DBP Rule Compliance Schedule
Population of System Submission Date Completion
Schedule or Largest System in for IDSE Plan or Date for Start Date for Stage 2
Combined 40/30 IDSE Report Compliance Monitoring
Distribution System Certification
1 2: 100,000 Oct. 1,2006 Jan. 1,2009 Apr. 1,2012
2 50,000 - 99,999 Apr. 1,2007 Jul. 1,2009 Oct. 1 2012
3 10,000 - 49,999 Oct. I, 2007 Jan. 1,2010 Oct. 1,2013
4 < 10,000 Apr. 1, 2008 July 1, 2010 Oct. 1,2013
Bremerton Status
Main System
The main system will need to comply with Schedule 2, which requires submission of an
IDSE plan no later than April 1,2007. The main system will not be eligible for an IDSE
40/30 waiver, since some sample results since October 2004 have exceeded 0.040 mg/L
for TTHM and 0.030 mg/L for HAAS. With regard to Stage 2 compliance monitoring,
the City will ultimately need to select a total of eight monitoring locations within the
main system (three for maximum TTHM, three for maximum HAAS, and two existing.
Stage 1 monitoring locations). Monitoring of these sites will be required no later than
October 1, 2012, at which point the LRAA compliance approach will take effect.
Based on historical DBP data from Stage 1 sampling, it appears the City may be able to
comply with the Stage 2 DBP Rule without making major treatment or operational
changes. However, the Stage 1 sampling locations may not be representative of maximum
TTHM and HAAS locations within the system. The IDSE will be required to identify
these worst-case sites. As part of this WSP update, the City is evaluating its IDSE
compliance options.
West 517Zone
Since the West 517 Zone is a NTNC system serving fewer than 10,000 people, the City
will not have to complete IDSE requirements for this system. The City will still be
required to comply with the routine Stage 2 monitoring requirements and .MCLs
according to Schedule 4 in Table 4-7. For groundwater systems serving less than I 0,000
people, the rule requires the collection of paired samples at two sites per plant once per
Water Quality Review and Regulatory Compliance
4-26
2005 City of Bremerton Water System Plan
year. The sites should represent locations of maximum TTHM and HAAS, respectively.
Therefore, the City will be required to provide a monitoring plan to DOH with
justification of the sites selected.
4.6 Anticipated Regulations
Several new or revised regulations are anticipated over the next six years. It is important the City
remain apprised of the development of these regulations. Table 4-8 presents a listing of
anticipated regulations, current schedule target dates, and potential regulated parameters. A brief
summary of each of the anticipated regulations follows.
Table 4-8
Anticipated Regulations Under the Safe Drinking Water Act
. Anticipated Regulation Parameters Regulated Date
Unregulated Contaminants 26 parameters Proposed: Plug. 2005
Monitoring Rule 2 Final Expected: 2006
Radon Radon Proposed: Nov. 1999
Final Expected: 2008
Lead and Copper Rule Lead, Copper, water quality parameters Proposed Expected: Early 2006
Revisions Final Expected: Late 2006
PercWorate PercWorate Unknown
Pltrazine Pltrazine Unknown
MillE MillE Unknown
Groundwater Rule Viruses, fecal indicators Proposed: May 2000
Final Expected: Late 2006
Total Coliform Rule Total Coliform, Fecal Coliform, E. Coli Proposed Expected: 2007
Revisions
4.6.1 Unregulated Contaminant Monitoring Rule 2
In August 2005, the EP A proposed a second Unregulated Contaminant Monitoring Rule
that includes two lists of contaminants for which some systems will be required to
monitor. All public water systems serving more than 10,000 people will be required to
conduct assessment monitoring for 11 contaminants on the Assessment Monitoring List
at distribution system entry points. Systems serving more than 100,000 people and
selected smaller systems will be required to conduct screening monitoring for 15
contaminants on the Screening Survey List This list includes contaminants that will be
monitored at distribution system entry points and within the distribution system. This
monitoring \vill be req"uired during" a: 1.2~month period between 2007 and 2010.
Bremerton Status
The City will likely be required to conduct assessment monitoring for 11 contaminants on
the Assessment Monitoring List (i.e., List 1) at distribution system entry points for the
main system.
Water Quality Review and Regulatory Compliance
4-27
2005 City of Bremerton Water System Plan
4.6.2 Radon Rule
A proposed Radon Rule was released in November 1999 providing two options for the
maximum level of radon allowable in community water supplies. The SDW A has
directed the EP A to not only propose and finalize an MCL for radon in drinking water,
but also to make available a higher alternative MCL (AMCL) accompanied by a
multimedia mitigation (MMM) program to address radon risks in indoor air. The
proposed MCL is 300 pCi/L, and the proposed AMCL is 4,000 pCi/L. The drinking
water standard that would apply to the City depends on whether or not the State develops
a MMM program. However, it is likely that these preliminary standards will change if
the MMM program becomes regulated under the EP A Indoor Air Office.
Bremerton Status
Radon sampling conducted in 1994 at all wells showed radon levels ranging between 80
and 255 pCi/L, all below the proposed MCL of 300 pCi/L. It does not appear as though
the rule will impact the main system, and the rule as proposed does not apply to NTNC
systems such as the West 517 Zone.
4.6.3 Lead and Copper Rule Revisions
The EP A initiated a review of LCR implementation in 2004 to determine if national lead
levels are increasing. As a result of this effort, the EP A identified a series of areas in
which changing the existing regulation would be beneficial. Table 4-9 lists the nine areas
that will be revised. The EP A anticipates issuing proposed revisions in early 2006.
Water Quality Review and Regulatory Compliance
4-28
2005 City of Bremerton Water System Plan
Table 4-9
Proposed Revisions to the Lead and Copper Rule
Activity Proposed Rule Revision Revision Obiective
Clarify language that speaks to the number of samples To address confusion about sample collection.
required. _......__......._..___..__......._____..._.______..._..___.___....____.._____m__........______.__..___.
Clarify language regarding the number of locations To address confusion about sample collection.
from which samples should be collected. __.........._____.__.___.__.__.._h......._.._.__.__..______.___________._
Modify definitions for a monitoring period and To address inconsistencies between guidance and
Monitoring compliance period. ..... __..._r_:~~~.~i~~~_:__________________.______________.__.___
............._..__m...__.___...._...__..______....__......._.__.............._....._........m_....___... ...--........-
Modify language to make it clear that all samples must To ensure that samples collected reflect effectiveness of
_____!?:_.~~:? wit~!~...!~.~~_I!l:_:~I.:.I1~~~)'_:~:.._____.______ corrosion control.
m.. ..._..............._....._...__.__.._..........._..........._..._.....Hm.__.__........_m__......._...___.___._._
Modify language to reconsider allowing large systems
above the action level to reduce tap monitoring based To ensure that systems over the action level maintain a
solely on the results of their water quality parameter sense of the degree of exposure in the community.
monitoring.
Modify language to require that a public water system To allow states an opportunity to provide input on the
Treatment notify the state of treatment changes 60 days prior to utility's decision or required additional monitoring
a treatment change rather than 60 days after a prior to a change in treatment that could affect
change. corrosion control.
To increase awareness for homeowners who participate in
Add language to require that utilities provide occupant tap monitoring programs and parents, students, and
notification ofthe results of monitoring. staff at schools that are required to monitor for lead in
f-..------.----.--.---....-.--.-.....----...---.---------.-.--..---..---...-- ___.~.!:!~kin~~a~:::....__________________________
Public Relations To address concerns about the appropriateness of flushing
Revise language to permit states to allow utilities to guidance included in current public education
modify the premise piping flushing directions in
public education language to address local language. Guidance will be provided to states and
circumstances. utilities to help them determine an appropriate flushing
time to recommend to customers.
Lead Service Line Revise language to require that any line previously To ensure that service lines testing below the action level
Replacement deemed to be replaced through testing be re- are not considered permanently "replaced" and
(Bremerton does not evaluated in the event that a subsequent treatment removed from the utility's inventory, but are instead
retested after any major changes to treatment that
have these) change causes the system to exceed the action level. could affect corrosion control.
Bremerton Status
The proposed revisions to the LCR could have minor impacts to the City's monitoring
schedules and public relations and notification requirements. The City will update its
lead, copper, and pH monitoring plans appropriately.
4.6.4 Groundwater Rule
The Groundwater Rule (GWR) was proposed in May 2000 to meet the requirements of
the 1996 SDW A Amendments, which require disinfection of groundwater supplies, if
np('p""~ny fr\r nllhli(' hp~lth nrr\tpf'tiAn ThPAhipf'tiup r\f thp nuro i" tr\ rp,'ll1f'p thp n111-.1if'
1.1.......................'-".......1. , .1.'-'.1. y~"-"............. .1...........-..1.'-.1..1. y.1'O.J.............Il.-.........,.I.... ... ........... ......,'-'J............Il......,.....
'-'.I. .............. '-" ..,.......... .I.>..J .........., ......................._....... ........._ l:-'IL...I.~.I...L.....
risk of exposure to waterborne pathogens from fecal contamination. This type of
contamination may reach groundwater supplies through various sources, such as septic
systems or stormwater runoff.
Water Quality Review and Regulatory Compliance
4-29
2005 City of Bremerton Water System Plan
The GWR applies to all water systems that distribute groundwater not treated to 4-log
(99.99 percent) inactivation or removal of viruses. For the purposes of compliance with
the proposed GWR, sources that are treated and continuously achieve 4-log inactivation
or removal of viruses are considered to be "disinfected." The sources that are treated but
do not meet this criterion are not considered to be "disinfected" sources.
The proposed GWR has five major components:
· System sanitary surveys conducted by the State to identify significant deficiencies;
· Hydrogeologic sensitivity assessments conducted by the State for ground water
sources that are not disinfected;
· Source water monitoring for indicators of fecal contamination by systems that do not
disinfect and also rely on a hydrogeologically sensitive aquifer or have detected fecal
indicators within the system's distribution system;
· Compliance monitoring for systems that disinfect to ensure they reliably achieve 4-log
inactivation or removal of viruses; and
· Corrective action by any system with significant deficiencies or positive microbial
samples indicating fecal contamination.
System Sanitary Survey
The GWR will require states to conduct sanitary surveys for all groundwater systems at
least once every three years. At a minimum, the surveys must cover the following
elements:
· Source
· Treatment
· Distribution system
· Finished water storage
· Pumps and pump facilities and controls
· Monitoring/reporting/data verification
· Water system management and operations
· Operator compliance with state requirements
Within 30 days of conducting each survey, the State must provide each system with a list
of observed significant deficiencies. After receiving a list of significant deficiencies,
systems have 90 days to take action to correct the deficiencies or submit a plan to the
State for making these corrections. For the proposed GWR, a significant deficiency is a
defect in design, operation, or maintenance or a failure or malfunction of the sources,
treatment, storage, or distribution system the State determines to be causing or has
potential for causing the introduction of contamination to the water delivered to
consumers.
Water Quality Review and Regulatory Compliance
4-30
2005 City of Bremerton Water System Plan
According to the proposed rule, systems that treat groundwater sources for 4-log
inactivation or removal of viruses or that have an outstanding performance record in all
the sanitary survey elements with no TCR violations since the last survey may move to a
surveying schedule of once every five years.
Hydrogeologic Sensitivity Assessment
The proposed GWR requires states to identify systems with higher likelihood for
contamination by waterborne pathogens from fecal contamination. Assessing
hydrogeologic sensitivity for all non-disinfecting groundwater sources will identify these
systems. Hydrogeologic sensitivity will be determined by the state using the type of
aquifer as a sensitivity indicator. The EP A indicates that wells obtaining water from a
karst, fractured bedrock, or gravel aquifer are sensitive to contamination unless protected
by a hydrogeologic barrier. If a physical barrier is present, this can void the determination
that an aquifer is "sensitive," but the specific criteria for such an exemption will be
developed by individual states.
Source Monitoring
The GWR requires three types of monitoring: (1) routine monitoring; (2) triggered
monitoring; and (3) monitoring for systems with disinfected groundwater sources.
Routine monitoring requirements apply to sources that are not disinfected and are
considered to be hydrogeologically sensitive. Triggered monitoring requirements apply to
systems with grQundwater sources not considered disinfected and producing positive total
coliform samples in the distribution system. These monitoring requirements are intended
to identify the possible presence of fecal contamination at the source. Monitoring for
disinfected sources verifies that continuous 4-log inactivation of viruses is achieved.
Corrective Action
The GWR requires water systems to implement specific actions after evidence of
contamination has been found in their system. If the State notifies a system of a
significant deficiency, the system must correct the deficiency, provide an alternate water
source, or implement treatment to reliably achieve 4-10g inactivation or removal of
viruses. If the system determines the Source water is contaminated, the system must do at
least one of the following: eliminate the source of contamination, correct the significant
deficiency; provide alternate source water, or provide treatment to reliably achieve at least
4-10g inactivation orremoval of viruses.
Bremerton Status .
The GWR couldi1llpact gIoundwater supplies inboth the main system and the West 5i7
Zone. The City currently provides chlorine disinfection at each well with the exception
of Well 19. It is unknown whether the existing chlorination practices are capable of
providing 4-10g virus inactivation and would be classified as "disinfected" under the
GWR. If the City wishes its well supplies to be considered "disinfected," it will have to
demonstrate the ability to continuously achieve 4-log virus inactivation to DOH and then
Water Quality Review and RegulatOlY Compliance
4-31
2005 City of Bremerton Water System Plan
operate the disinfection systems to ensure this criterion is always met (e.g., provide
continuous monitoring and notify DOH any time chlorine residual falls below the state-
determined residual disinfectant concentration for more than four hours). For sources that
are not disinfected or for which the City does not wish to pursue "disinfected" status, the
City is prepared to cooperate with the state in its evaluation of hydrogeologic sensitivity
and the additional measures needed at each well to ensure compliance with the GWR.
4.6.5 Total Coliform Rule Revisions
As part of its six year review of existing regulations, EP A has determined the need to
revise the TCR. Revisions may include requirements to address finished water quality in
the distribution system and evaluate additional or alternative monitoring strategies that
would be more cost-effective and maintain or improve public health. As part of the
process for determining the appropriate revisions to this rule and the need for a future
Distribution System Rule, a series of white papers were developed by EP A and other
groups in 2002 to describe potential health risks in the distribution system. These papers
covered the following topics:
. Intrusion
. Cross-connection control
. Aging infrastructure and corrosion
. Permeation and leaching
. Nitrification
. Biofilms and bacterial growth
. Covered storage
. Decay in water quality over time
. New or repaired water mains
In addition, EP A and the American W ater Works Association are currently
preparing issue papers related to developing revisions to the TCR. These papers will
cover the following distribution system topics:
· Indicators of water quality
· Effectiveness of disinfectant residual
e Compliance with the existing TCR
· Hazard analysis and control strategies
· Accumulation of inorganic contaminants
· Nutrient availability
· Causes of contaminant events and positive coliform samples
e Total coliform sample invalidation
Water Quality Review and Regulatory Compliance
4-32
2005 City of Bremerton Water System Plan
Bremerton Status
The date for a proposed revised TCR rule and/or Distribution System Rule is uncertain at
this time. However, any developments with either rule will likely have an impact on the
City. It is quite possible these rules will include the use and documentation of best
management practices within the distribution system. Cross connection control may be a
primary focus. As part of this WSP update, a detailed review of the City's cross
connection control program was conducted and is described in Section 6.
4.6.6 Potentially Regulated Contaminants
In addition to these anticipated regulations, the City will track potential regulations by
keeping up-to-date with the Contaminant Candidate List (CCL). The CCL is the primary
source used by the EP A for establishing priority contaminants that may face future
regulation. In February 2005, the EP A issued the second CCL, which is comprised of 51
contaminants (nine microbial and 42 chemical) included on the previous list. The CCL-2
includes at least three parameters, namely atrazine, methyl-t-butyl ether (MtBE), and
perchlorate, that the drinking water industry anticipates will be regulated in the future.
The EP A will determine whether the CCL-2 contaminants should be pursued for future
regulations in August 2006.
Bremerton Status
As part of its VOC monitoring efforts, the City also analyzes for MtBE. Samples for each
of the five designated entry points in the main system and the three wells in the West 517
Zone have been non-detectable for MtBE. As part of the UCMR monitoring in 2002 and
2003, the City analyzed for perchlorate in each of the main system designated entry
points. All results were below the detection limit. Should these contaminants be
regulated in the future, it does not appear as though the City's current sources would be
affected.
4.7 Summary of Regulatory Status
A review of monitoring procedures and water quality results from 2000 to 2005 indicates the
City has been in full compliance with all effective federal and state drinking water regulations for
both its main system and the West 517 Zone. Table 4-10 provides a summary of applicable
effective and promulgated regulations, the City's compliance status, and action plans.
The recently promulgated L T2ESWTR and Stage 2 DBP Rule will each have a significant impact
on the monitoring, treatment, and operations of the City's water systems. By April 2007, the
City will develop and submit plans forCryptosporidium monitoring of its Union River supply
and its IDSE approach for the main system. By October 2012, the City will provide additional
treatment of its surface supply to remove or inactivate Cryptosporidium. Also in 2012, the City
will begin monitoring nev/ly selected DBP sites and convert to the more rigorous LRAA
compliance approach.
Water Quality Review and Regulatory Compliance
4-33
2005 City of Bremerton Water System Plan
Table 4-11 provides a summary of water quality monitoring requirements for both the main
system and the West 517 Zone. The table includes parameters to be monitored and current
sampling location and frequency. This table is intended to be a guide; detailed requirements are
available in WAC 246-290 and by contacting DOH. Based on the current monitoring
frequencies, Tables 4-12 and 4-13 summarize the City's water quality monitoring schedule for
the main system and the West 517 Zone, respectively, for the period 2006 through 2011. The
estimated analytical costs (in year 2006 dollars) for these monitoring schedules are summarized
in Table 4-14.
Water Quality Review and RegulatOlY Compliance
4-34
2005 City of Bremerton Water System Plan
Table 4-10
Summary of Applicable Existing and Promulgated Regulations
Regulation Reouirements Bremerton Status Compliance? Recommendation
Main System: Plan
Written Plan updated in 2006 Yes Maintain updated plan per
W517 Zone: Plan WAC 246-290-300
Total Coliform updated in 200 I
Rule
Monitoring Main System: Ongoing Yes Maintain monitoring records
W517 Zone: Ongoing for 5 years
Watershed Control Main System: Plan Maintain updated plan per
updated in 2006 Yes
Plan (WCP) W5l7 Zone: NA WAC 246-290-690
Surface Water
Treatment Rule
Monitoring Main System: Ongoing Yes Continue with monitoring
W517 Zone: NA
WCP update with Main System: Plan Maintain updated plan per
Cryptosporidium updated in 2006 Yes WAC 246-290-690
Interim Enhanced control W517 Zone: NA
Surface Water
Treatment Rule
Monitoring Watershed monitoring Yes Continue with monitoring
on-gomg.
Main System: Draft Update the monitoring plan
Written Plan Plan developed By Jan 2007 as necessary per elements
Long Term 2 W517 Zone: NA of the final rule.
Enhanced
Surface Water
Treatment Rule Start by April 2007
Monitoring Future Requirement By Apr 2009 Complete by April 2009
Main System: Plans
Written Plan updated in 2005 Yes Maintain updated plan per
W517 Zone: Plans WAC 246-290-300
Phase I, II, and V updated in 2004
Regulations
Monitoring Main System: Ongoing Yes Continue with monitoring
W517 Zone: Ongoing and renewal of waivers
Water Quality Review and RegulatOlY Compliance
4-35
2005 City of Bremerton Water System Plan
Table 4-10 (Continued)
Summary of Applicable Existing and Promulgated Regulations
Treatment Main System: Continue with WQP
Completed in 1999 Yes
Optimization W5l7 Zone: NA monitoring
Lead and Copper
Monitoring Main System: Ongoing Yes Tap samples required in
W5l7 Zone: Ongoing 2008 for both systems
Consumer Distribute water Main System: Update plan as needed and
Confidence Distributed annually Yes
Report quality reports W517zone: NA distribute every year.
Main System: Plan
Written Plan updated in 2004 Yes Maintain updated plan per
W517 Zone: Plan WAC 246-290-690
Stage 1 updatediri 2004
D/DBP Rule
Monitoring Main system: Ongoing Yes Continue with monitoring
W517 Zone: Ongoing
Main system: Need to Prepare IDSE Plan by April
Written Plan complete IDSE Future 2007. Complete IDSE and
W517 Zone: Need to submit report by 2009
Stage 2 select future sites
DBP Rule
Monitoring Future Requirement Future Routine system monitoring
by 2012/2013
Water Quality Review and Regulatory Compliance
4-36
2005 City of Bremerton Water System Plan
Table 4-11
Summary of Water Quality Monitoring Requirements
Parameter Regulation Samoling Location(s) Current FreQuency
Organic Compounds Phase I, Phase II, Phase V Designated entry points Once every 3 years (or waived)
and WAC 246-290
Inorganic Compounds Phase II, Phase V and WAC Designated entry points GW: Once every 3 years
246-290 SW: Once per year
Physical Parameters Phase II, Phase V and WAC Designated entry points GW: Once every 3 years
246-290 SW: Once per year
Phase II, Phase V and WAC Distribution system served by Main system: Not applicable
Asbestos 246-290 AC Pipe West 517 Zone: Once every 9 years
Nitrate Phase II, Phase V and WAC Designated entry points Once per year
246-290
Nitrite Phase II and WAC 246-290 Designated entry points GW: Once every 3 years
SW: Once per year
Lead and Copper Rule and Reservoir 4 and distribution Reservoir 4: Biweekly
Water Quality Parameters (pH) WAC 246-290 system locations System: Each 6-month period
Lead and Copper Lead and Copper Rule and Customer taps Main system: Once every 3 years
WAC 246-290 West 517 Zone: Once every 3 years
Radionuclides (Gross Alpha and Radionuc1ides Rule and Designated entry points DOH will provide guidance
Radium-228) WAC 246-290
Disinfection Byproducts (TTHM Stage I D/DBP Rule and Designated system locations Main system: Quarterly
and HAA5) WAC 246-290 West 5 17 Zone: Once per year
Total Coliform Rule and Representative of distribution Main system: At least 60 per month
Total Coliform WAC 246-290 system and entry point West 517 Zone: At least one sample per
month
Fecal Coliform Surface Water Treatment Surface water supply before At least 5 samples per week
Rule treatment
Turbidity Surface Water Treatment Surface water supply before Continuously during periods of use
Rule treatment
Chlorine Residual Surface Water Treatment Reservoir 4 entry point and Reservoir 4: Continuously during use.
Rule distribution system System: Monthly with colifonn
Water Quality Review and Regulatory Compliance
4-37
2005 City of Bremerton Water System Plan
Table 4-12
Sampling Schedule for Main System (2006 through 2011)
Parameters 2006 2007 2008 2009 2010 2011
QI Q2 Q3 Q4 QI Q2 Q3 Q4 QI Q2 Q3 Q4 QI Q2 Q3 Q4 QI Q2 Q3 Q4 QI Q2 Q3 Q4
Volatile Organic Compounds . .
Synthetic Organic Compounds Waiver Period Waiver Period Waiver Period
Inorganic Compounds at T-I (I) . . . . . .
Inorganic Compo at T-2 to T-5(1) . .
Radionuclides Will be scheduled by DOH
Nitrate-Nitrogen . . . . . .
Lead and Copper . .
Stage I TTHM and HAA5 . 0 . . . . . . . . . . . . . . . . . . . . . .
Stage I Chlorine Residual . . . . . . . . . . . . . . . . . . . . . . . .
Total Coliform - Dist. System .
. . . . . . . . . . . . . . . . . . . . . . . . .
Fecal Coliform - Union River . . . . . . . . . . . . . . . . . . . . . . . .
Cryptosporidium - Union Fliver . . . . . . . . .
Consumer Confidence RepOt1 . . . . . .
I. See Table 4-1 for description of entry point designations T-I through T-5.
Water Quality Review and Regulatory Compliance
4-38
2005 City of Bremerton Water System Plan
Table 4-13
Sampling Schedule for West 517 Zone (2006 through 2011)
Parameters 2006 2007 2008 2009 2010 2011
QI Q2 Q3 Q4 QI Q2 Q3 Q4 QI Q2 Q3 Q4 Ql Q2 Q3 Q4 Ql Q2 Q3 Q4 Ql Q2 Q3 Q4
Volatile Organic Compounds . .
Synthetic Organic Compounds Waiver Period Waiver Period Waiver Period
Inol'ganic Compounds . .
Nitrate-Nitrogen . . . . . .
Lead and Copper . .
Asbestos .
Stage 1 TTHM and HAA5 . . . . . .
Stage I Chlorine Residual . . . . . . . . . . . . . . . . . . . . . . . .
Total ColifonTI - Dist. System . . . . . . . . . . . . . . . . . . . . . . . .
Water Quality Review and Regulatory Compliance
4-39
2005 City of Bremerton Water System Plan
Table 4-14
Summary of Analytical Costs for Continued Regulatory Compliance ($2006)
Parameters Unit Cost Year
2006 2007 2008 2009 2010 2011
VOC Suite $175 $0 $0 $1,400 $0 $0 $1 ,400
SOC Waiver $3,110 $0 $0 $3,110 $0 $0 $3,110
lOC Suite (inc. Nitrate) $320 $502 $1,384 $1,678 $502 $1,384 $1,678
Lead and CODDer $25 $0 $0 $875 $0 $0 $875
Radionuc1ides $135 $0 $0 $1;350 $0 $0 $1,350
Asbestos $175 $0 $0 $0 $0 $0 $175
Unregulated Contaminant Monitoring Rule $600 $0 $0 . $5,000 $5,000 $0 $0
Total ColifOlm (Dist. System)\a) $18 $15,120 $15,120 $15,120 $15,120 $15,120 $15,120
Fecal ColifOlU1 (Union River) $22 $6,600 $6,600 $6,600 $6,600 $6,600 $6,600
Heterotrophic Plate Count\O) $25 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000
Total Triha10methanes (TTHM)\C) $80 $1,360 $1,360 $1,360 $1,360 $1,360 $1,360
Haloacetic Acids (HAA5)\C) $140 $2,380 $2,380 $2,380 $2,380 $2,380 $2,380
Cryptosporidi urn! Giardia lamb lia (d) $450 $0 $4,500 $5,850 $1,350 $0 $0
Consumer Confidence Report $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000
Total Estimated Annual Analytical Costs $42,000 $47,400 $60,800 $48,400 $42,900 $50,100
(a) Assumes 70 samples per month (62 within the main system and W5l7 zone and 8 entry-point)
(b) Assumes 20 samples per month within the distribution system
(c) Does not include DBP monitoring conducted as palt of the Initial Distlibution System Evaluation (lOSE)
A separate cost analysis for the lOSE compliance approach is provided in a conCUITent Tech Memo.
(d) Assumes monthly Cryptosporidium monitoring conducted from April 2007 to April 2009
Water Quality Review and Regulatory Compliance
4-40
4.8 Laboratory Certification
Table 4-15 summarizes the certified laboratories that provide analytical services for all required
monitoring conducted by the City of Bremerton.
Table 4-15
Laboratories Used by the City of Bremerton for Drinking Water Analysis
Name Certifications Analvsis
Washington State Department Washington State Radionuclides, Radon
of Health Laboratory
Twiss Analytical Laboratory Washington State IOCs, Lead and Copper, Total Coliform, Fecal
Coliform, E. coli, Heterotrophic Plate Count
Edge Analytical Laboratory Washington State SOCs (UCMR), TTHM, HAA5, TOe, VOCs,
Alkalinity
LabCor, Inc. Washington State Asbestos
Grants Pass Laboratory Federal EP A Cryptosporidium, Giardia lamblia
Water Environmental Services, None required for Zooplankton, Phytoplankton
Inc. plankton analysis
Aquatic Research, Inc. Washington State Nutrients, TOC, UV254
4.9 References
Long Term 2 Enhanced Surface Water Treatment Rule Monitoring Plan (Cryptosporidium). City
ofBremerton. Main System. November 2005.
Monitoring Plan for Compliance with the Disinfectant/Disinfection Byproducts Rule. City of
Bremerton. Water Supply System. August 2004.
Monitoring Plan for Compliance with the Disinfectant/Disinfection Byproducts Rule. City of
Bremerton. West 517 Zone. January 2004.
Monitoring Plan for Inorganic Chemicals. City of Bremerton. Main System. March 2005.
Monitoring Plan for Lead and CopperRule. City of Bremerton. Main System. April 2004.
Monitoring Plan Lead and Copper Rule. City of Bremerton. West 517 Zone. August 2004.
Monitoring Planforlnorganic Chemicals. City of Bremerton. West 517 Zone. May 2004.
Monitoring Plan for Organic Chemicals. City of Bremerton. Main System. July 2004.
Monitoring Plan for Organic Chemicals. City of Bremerton. West 517 Zone. July 2004.
Monitoring Plan for Radionuclides. City of Bremerton. Main System. March 2005.
Water Quality Review and Regulatmy Compliance
4-41
Monitoring Plan for Radionuclides. City of Bremerton. West 517 Zone. May 2004.
Monitoring Plan for Union River Reservoir. City of Bremerton. Main System. July 2004.
Water Quality Monitoring Plan. Coliform Monitoring Plan. System ID #08200R. 2005.
Water Quality Monitoring Plan, Introduction and Water System Description. Main System.
System ID #08200R. 2004.
Water Quality Monitoring Plan. Introduction and Water System Description. West 517 Pressure
Zone. August 2005.
Water Quality Review and RegulatOlY Compliance
4-42
2005 Bremerton Water System Plan
Section 5
Transmission and Distribution System
-
5.1 Introduction
The transmission and distribution system for Bremerton's Main System is comprised of seven
pressure zones, 291 miles of pipe, 16 treated water reservoirs, 10 pump stations, five booster
pump stations, more than 20 pressure-regulating valves, two zone interties, and five interties with
other water systems.
The transmission and distribution system compnsmg Bremerton's West 517 Zone System
includes one pressure zone with 11 miles of pipe, two treated water reservoirs, one pump station,
one firelbooster pump station, four pressure-regulating valves, and one intertie with the
Bremerton Main System.
A detailed description of these facilities is provided in this section.
5.2 Pressure Zones
The City of Bremerton Main System's six pressure zones serve customers in East and West
Bremerton and are named accordingly as shown below. The West 580 Zone is currently under
construction and anticipated to be in operation before the end of 2006.
West Bremerton
. W256
. W 440
. W580 (to be completed in 2006)
. W 650
East Bremerton
. E240
. E398
. E490
The Bremerton West 517 Pressure Zone System consists of only one pressure zone, which is the
West 517 Pressure Zone.
These pressure zones are illustrated in the Water System Schematic (Figure 1-3). Hydraulic
gradients within the zones are generally controlled by the water levels in the system reservoirs.
Service pressures within the zones are maintained at acceptable levels under normal, peak, and
emergency operating conditions. A pressure of 30 psi must be available at all service connections
under peak hourly demand conditions. Five small closed zones are served by booster pump
stations. A description of each pressure zone is presented in Table 5-1.
Transmission and Distribution System
5-1
Pr"ssu re
Zone
Source Capacity
Facility GPM
Reservoir
Capacity
Table 5-1 General Pressure Zone Information
A vg Day
Demand
Major Users
Redundancy
Provisions for Power Outages
~Gm~v{G!Fij{ij~i\'fER11i&jjfi~lSMSJllJ!;
Surface supply 12,500
PS 2 (All AC wells) 4,000
Well] 7 735
Well 20 1,150
W517/W256 intertie 600
W 440/W256 intertie 320
W256 via
Booster Station 9
rGi~iiYr@F}BREMf:\R!f!i>N~ES;fJ~jmP,RESS13R~NEiSYS:11E~
Well 15 205
Well 18 375
Weill\! 240
PS3 200
3,640
w/fire
flow
W256
W440
W580
:W06
com let ion
W650
IE240
1E398
!E490
Lafayette
Cook Road
Hawthorne
Qiuarry
W517
Port
W256 via
PS 4
PS 17
W256 via
PS281
W440 via
PS 8
W256 via b'f8lvity
Well 14
E398/E240 intertie
Well 9
Well ]3
Well 21
E240 via
PS ] I
PS 14
PS 16
E398 via
PS ] 2
PS ] 3
W256 via
Booster Station 3'
W256 via
Boosler Station 7
W256 via
Booster Station 6
W517via
Booster Station] 0
],500
1,500
4,000
1.750
180
600
270
510
IAOO
600
1.250
950
1,000
300
17 MG
Reservoirs 4, 5,
and 21
2.7 MG
Reservoirs
6 and 8
OA5 MG
(Port Orchard)
I.OMG
Reservoir 23
4.58 MG
Reservoirs
11,16, and 19
4.8 MG
Reservoirs
12,13,17, and 20
2.0 MG
Reservoirs
15 and 18
None
60
None
3 MGD
(incl. PSNS)
0.9 MGD
TBD
0.02 MGD
1.5 MGD
1.2 MGD
0.7 MGD
Est. 15,000
gal/day
Est. 2,000
gal/day
Est. 2,200
gal/day
Est. 2,000
gal/day
0.05 MGD
winter
0.55 MGD
summer
Est. 25,000
Gal/day
Downlown and
Kitsap Way
businesses
PSNS
HMGD)
A few industrial
facilities
Residential
None
Wheaton Way
businesses
Harrison Hospital
0.1 MGD
Wheaton Way
businesses
Mainly residential
Residential only
Residential only
Residential only
Residential only
Golf Course
Industrial Park
Airport
Commercialon]y
Multiple sources
Interties with 2 other zones
2 pump stations
Inlertie with W650 Zone
Intertie with Port Orchard
Large amounl of storage for
low ADD
Intertie with 2 zones
Multiple pump stations.
ADD for zone can be met
with the 3 wells. Can also
use E240 Zone, and
Reservoir] 9 can be valved
to just serve the hospital.
2 pump stations
N/A
N/A
N/A
N/A
Can be supplied surface
water if necessary. Golf
course has irrigation ponds.
Diesel back-up pump
Full Res. 22 can supply CI, water about a week. Zone supplicd by b'favily as long as surl"ce
supply is operational and water quality requirements met. 20 kW generator for analyzers.
Transfer switches at Wells 18/20 and screen building. Storage alone about 2 days.
About 2 days of storage, Would need a portable generator in an extended power outnge.
Transfer switch at PS 17 and PS 4.
PS 281 has a m8nu81 transfer switch.
About 20 days of slorage with reservoir kept at half full to maintain both chlorine residual and
fire storage. Transfer switch at PS8.
As long as surface supply availab]e, this zone would not be out of water. Storage alonc would
last about 4 days. Transfer switch installed 811 Well 14.
A 150 kW portable generator is kept 811 Well 14 and sized 10 be used at any facility in thc east
side. Transfer switch for this generator installed at multiple facilities and at PS 16/Well 13 and
PS 11 in this zone. About 4 day's storage.
About 3 day's storage. Transfer switch installed at PS 12.
This small zone can gel water fromlhe W256 zone bul would have pressurc about 20 psi.
This small zone can get water from the W256 zone but would have pressure about 20 psi.
This small zone can get water fromlhe W256 zone but would have pressure about 20 psi.
This small zone can get water from the W256 zone but would have pressure about 30 psi.
60
None
During emergencies, the golf course could only use water from on-site ponds. Potable storage
alone would last about 2 weeks. Transfer switch installed at Wells 18/20.
During power outages, ] ,500 gpm diesel lire pump activalcs. Trnnsfcr switch also allows the use
of the portable generator.
Notcs: Surface supply fiml yield is 2,020 MGY. TM capacity is 18 MGD. "Days of storage" assumes sources unavailable and ADD. In an emergency there would be water restrictions, b'favity
surface supply, and limited pumping via the generator.
5-2
Transmission and Distribution System
120
None
1.2 MG
Reservoirs
ION and 10S
None
2005 Bremerton Water System Plan
5.3 Control Valves
The Bremerton Main System has 25 pressure-regulating valves and the Bremerton West 517
Zone System has four. These valves are detailed in Table 5-2 and include installations for
reducing pressure, pressure relief, and pressure zone intertie. Pressure reducing stations allow
water to flow from higher pressure zones to lower pressure zones without over-pressurizing the
lower zone. Pressure relief valves prevent over-pressurization by relieving excess pressure to a
lower pressure zone or to the atmosphere.
A number of the valves are an integral part of the day-to-day operation of the system and provide
water to lower elevations at acceptable pressures. Several pressure reducing stations operate only
in an emergency capacity, providing water to the lower zones when the pressure downstream
drops below preset levels during very high demands. This condition would only occur during a
system failure, a large fire demand, or some other uncommon event.
The Water Utility currently includes two zone interties that allow water to flow from higher
pressure zones to lower pressure zones.
5.4 Interties with Other Water Systems
The Utility has interties with five other water systems, as indicated previously in Table 3-8 and 5-
2. Most of these interties provide water from Bremerton to neighboring water districts. Water
in the West 580 Zone is mixed with water from the Port Orchard system. The North Perry
intertie could provide water to Bremerton, although it has never been used for this purpose. It is
meant to provide an emergency intertie with the North Perry Avenue Water District. One intertie
is used to provide surplus water to the City of Port Orchard.
A system intertie exists between the Bremerton Main System and the Bremerton West 517 Zone
System at Pump Station 3. Water can either be pumped from the surface water transmission
main to the West 517 Zone (as long as Surface Water Treatment Rule requirements are met) or
water can be gravity fed from the West 517 Zone to the West 256 Zone transmission main.
Transmission and Distribution System
5-3
2005 Bremerton Water System Plan
Table 5-2
Bremerton Main System Control Valves
2" 70/74 psi
V9 Werner Road at the church Reduces pressure within the West 650 Zone
6" Nonnally Open
1.5" 34 psi
VIO Union A venue and Poindexter West 440 Zone to West 256 Zone
6" Nonnall Oen
2" 55/59 psi
VII Werner Road at UPS West 650 Zone
6" Normall en
Fairgrounds Road and 6" 53 psi
V12 East 398 Zone to East 240 Zone
Trac on Blvd. 2" Normall Closed
Riddell Road and 3" 32 psi
VI3 East 490 Zone to East 240 Zone
Benita Place NE 6" Normall Closed
2" 71 psi
VI4 Pine Road and The Woods Reduces pressure within the East 398 Zone
6" Normall en
1.5" 69 psi
VI6 Tibardis Court and Cortez Drive East 398 Zone to East 240 Zone
8" Normall en
2" 65 psi
VI8 Price Road and Francis Street West 440 Zone to West 256 Zone
4" Normall en
2.5" 50 psi
VI9 Northlake Way and W. Lake Drive West 440 Zone to West 256 Zone
6" Normall en
2" 45 psi
V21 Sunn Fjord Building I Pressure regulating within the West 440 Zone
6" Normall en
Sunn Fjord and 3,d Street 2.5" 65 psi
V22 Reduces pressure within the West 440 Normally Open
8"
4" 52 psi
V31 4132 First Street Reduces pressure within the West 440 Zone
10" Nonnall en
2" 50 psi
V38 Holland Road NW East 398/East 240
6" Normall Closed
2"
V39 500 Union Ave and Werner Road Reduces pressure within the West 440 Zone
V21 Sunn Fjord Building I 1.5" From West 440 Zone to atmosphere Normally Closed
V27 21st Street and Cambrian Avenue '2" ,Prevents excess pressure in the Lafayette 40 psi
boosted West 256 Normall Oen
V28 National Avenue & Kitsap Way 3" Relieves excess West 440 pressure to the Normally Closed
West 256
V34 Kent A venue and Evans A venue 2" West 440 to atmosphere Normally Closed
V36 NE Woods Place 2" East 398 to atmosphere Normally Closed
V37 Pump Station 17 6" Function unknown - valve olT Normally Closed
V43 Pump Station 2 4" West 256 Surge Anticipator
V52 Pump Station 8 4" West 650 Surge Anticipator
V54 Pump Station 4 4" West 440 Surge Anticipator
V55 Pump Station 2A 4" Wesi580Zone Surge AJlticipator
Transmission and Distribution System
5-4
2005 Bremerton Water System Plan
Table 5-2 (continued)
NA
Price Road
West 440 Zone to West 256
Normally Open
# Location Size Function Setting
V47 Pump Station 3 4" Pump Control Valve from Normally Closed
West 256 to West 517
Pacific and First 12"
PSNS Farragut and Montgomery 12" Flows from West 256 Normally Open
First and Rainier 12"
Jackson
Austin Drive 12"
Park Naval Flows from West 256 Normally Open
Shorewood Drive 8"
Housing
City of Port Anderson Hill Road 18" Pumps from West 256 Normally Closed
Orchard
City of Port Old Clifton Road
16" From W256 Normally Open
Orchard (to be installed in 2006)
VI5 Marwood Drive 4" East 398 to North Perry Water District Normally Closed
Emergencv Onlv
Bremerton Main System Intertie Valve with Separate Water Systems
Note: No single valves separate the City's system from Rocky Point.
Bremerton West 517 Zone Valves
Location # Location Size Function Settin2
NA Pump Station 3 4" System/Zone Intertie Normally Closed
West 517 Zone to West 256
Relief
V32 Barney White Road & Constance 4" West 517 Zone relief to atmosphere Normally Closed
IS'
V35 Imperial Way - Bremerton Industrial Park 3" Regulating within the 46 psi
West 517 Zone Normally Open
8"
V50 5785 Imperial Way 6" Regulating 65 psi
4" BS 1 0 to Airport Normally Open
V53 5785 Imperial Way 8" Relief/Recirculation Normally Closed
West 517 Zone to Reservoir 10 N
Transmission and Distribution System
5-5
2005 Bremerton Water System Plan
5.5 Pump Stations
One booster station and five water pump stations are located in the East Bremerton distribution
system. Pump Stations 11, 14, and 16 draw water from the East 240 Zone and raise it to the East
398 Zone, filling Reservoirs 12, 13, 17, and 20. Pump stations 12 and 13 in the East 398 Zone
provide water to Reservoirs 15 and 18 in the East 490 Zone. Booster Station 5 is an in-line
booster that draws water across the Port Washington Narrows from the West 256 Zone into the
East Zone 240.
Five water pump stations and five booster stations are located in the West Bremerton distribution
system. Pump Station 2, located at Anderson Creek, is the largest active station in the system and
provides water to the West 256 Zone from the Anderson Creek wellfield. The Anderson Creek
wells pump at a constant rate to the pump station aeration basin. The well water is chlorinated
and pumped as needed into the system. Variable frequency drives allow control of the pump
station to prevent discharge of groundwater into Anderson Creek. Pump Stations 4 and 17 draw
water from the West 256 Zone to supply the West 440 Zone by maintaining the level in
Reservoirs 6 and 8. Pump Station 8 supplies water to the West 650 Zone and Reservoir 23.
Booster Stations 3, 6, 7, and 9 provide water as necessary at an acceptable pressure to the closed
zones. The pump stations are described in Table 5-3.
The West 256 Zone System includes the Pump Station 3 intertie pump station and Booster
Station 10, which provides fire flow and pressure to the Airport and Industrial Park at the Port of
Bremerton.
Pump Station 2a is currently under construction to be completed in 2006 and will provide water
from the West 256 Zone to the West 580 Zone and the Port Orchard McCormick water system
and Port Orchard's 0.45 MG reservoir.
Transmission and Distribution System
5-6
Table 5-3
City of Bremerton Main System Pump Stations
Pump Station Description Capacity Function Comments
HistOlic pump station located at 4230 W. Five pumps: Not used regularly since 1956. Maintained
PS I Emergency suIiace supply potential for emergencies - last used in 1985 drought.
Gorst Creek Old Belfair Highway constlUcted in 1936. 50 to 250 hp Regular use would require more treatment.
Replaced previous pump station at same 4,000 gpm total Pump station collects water li'om up to six
PS 2 site. ConstlUcted in 1985 at 2380 Four pumps: Transfers water fi'OIn the Anderson Creek wells and pumps into system. Pumps have
Anderson Creek Anderson Hill Road SW, Upgraded in 2 - 650 gpm wellfield into the West 256 Zone, VFDs,
2006. 2 -1,350 gpm
Pump station located at 1335 Jones in the 1,500 gpm total Draws water fi'Om the West 256 Zone and
PS 4 Two pumps: tran sfers it to the West 440 Zone to Used in conjunction with Pump Station 17.
West 256 Zone. 750 gpm each Reservoirs 6 and 8.
PS 8 Pump station located in the West 440 1,750 gpm total Pumps trom the West 440 Zone; transfers it Pump station and reservoir placed on line in
Zone at 7300 Wel11er Road adjacent to Two pumps: to the West 650 Zone, Reservoir 23. 2004.
Reservoir 8. 900 gpm each
East 240 Zone pump station located at 844 . 1,400 gpm total Transfers from Reservoir II Located on the same site as Reservoir II.
PS II Two pumps: water to Occasionally PS II has to be tumed olT duc
Callahan Olive. 700 gpm each Reservoirs 12 and 13 in the East 398 Zone. to low reservoir levels.
950 gpm total
PS 12 East 398 Zone pump station located at Two pumps: Transfers water trom Reservoir 12 to Located on the same site as Reservoir 12.
3021 Olympus Olive. I - 500 gpm Reservoirs 15 and 18 in the East 490 Zone.
I - 450 gpm
1,000 gpm total
PS 13 East 398 Zone pump station located at Two pumps: Transfers water li'Dln Reservoir 13 to Located adjacent to Reservoir 13 and works
2929 Olympus Olive. I - 250 gpm Reservoirs 15 and 18 in the East 490 Zone. in conjunction with Pump Station 12.
1-750gpm
PS !4 East 240 Zone pump station located at One Pump: Transfers water from the East 240 Zone to Works in conjunction with Pump Station II.
2! 0 I Schley Way, 600 gpm Reservoirs 12 and 13 in the East 398 Zone.
1,250 gpm total Transfers water trom the East 240 Zone and
East 240 Zone pump station located at 50 Three pumps: Well 14 to Reservoirs 17 and 20 in the East Works in conjunction with Wells 9 and 13 to
PS 16 NE Vena Avenue. 2 - 525 gpm 398 Zone. sustain level in Reservoirs 17 and 20.
I - 200 gpm
West 256 Zone pump station located at 1,500 gpm total Transfers. water fi'om the West 256 Zone to Completed July 1991; source is primarily PS
PS 17 4398 W. Old Belfair Highway near the Three pumps: 500 the West440 Zone. Site of CT Monitoling
Forestry Operations Center. gpm each Station .3 2 when that pump station is running.
PS-2A (future) West 580 Pump Station to be located on Projected: Transfers water fi'om the West 256 Zone to Scheduled for installation in 2006.
Anderson Hill Rd in 2006. 1,800 Iwm future West 580 Zone Reservoir.
Booster Station 3 West 256 Zone located at 3000 17th Street One pump: Increases pressure to the Lafayette closed Serves approx. 69 residences; spare pump on
and Latayette. 300 gpm zone at approx. elevation 350. hand.
Booster Station 5 East 240 Zone at 589 Lebo Blvd. One pump: Ol-aws water across the NalTOWS from the Generally not in use; can help maintain level
I ,000 gpm West 256 Zone to the East 240 Zone. in Reservoirs II, 16, and 19.
Booster Station 6 West 256 Zone located at 4490 Two pumps: Increases pressure to Hawthol11e and W. Serves apPlDximately 9 residences.
Hawthol11e Avenue W 42 gpm each Summit Avenue in Gorst.
Booster Station 7 West 256 Zone located at 1527 Cook Two pumps: Increases pressure to Cook and Shawn Serves 9 residences.
Road sw. 53 gpm each Roads in Gorst.
Booster Station 9 West 256 Zone located at 2704 Quany One pump: Increases pressure to Quany St. Serves 13 residences.
Street. 84 gpm
Transmission and Distribution System
5-7
Pump Station Description Capacity Function Comments
Draws water from the surface Pumps water to the Gold Mountain Golf
Pump station located at 7061 W. Old One Pump: supply and Wells 17 and 20 and Course and Reservoir 10. Emergency use
PS 3 Belfair Highway in West 256 Zone. 200 gpm pumps to the West 517 Zone. onlv. Site ofCT MonitOling Station 2.
Four Pumps:
2 - 1,500 gpm tire pumps This booster station is used to increase
West 517 Zone fire and booster I - 500 gpm pump Maintains adequate system pressure and provide tire flow protection to
Booster Station 10 station located at 5785 hnpelial Way 1 - 200 gpm pump pressure and provides tor fire the POll of Bremellon industlial park
adjacent to Reservoir 10. Domestic: 700 gpm tlow. acquired by the Utility in July 1999.
Fire tlow: 1,500 gpm
Backup tiretlow: 1,500 gpm .
Table 5-3 Continued
West 517 System Pump Stations
5-8
Transmission and Distribution System
5.6 Transmission and Distribution Piping
The City of Bremerton has an extensive network of transmission and distribution piping ranging
in size up to 36 inches in diameter. Pipe inventory consists of approximately 291 miles of pipe
in the Bremerton Main System and 11 miles of pipe in the West 517 Zone System with the
majority being 6- and 8-inch diameter distribution piping. A summary of the quantity of pipe by
diameter is provided in Table 5-4.
5.6.1 Transmission Piping
Transmission main piping is used to move large quantities of water from one area of the
system to another, generally without service connections, and includes the pipe bringing
water from the McKenna Falls Intake Facility and the three pipes crossing the Port
Washington Narrows. The transmission pipe supplying water from the McKenna Falls
Intake Facility ranges in size from 24 inches to 36 inches in diameter. The pipeline is
approximately six miles long and supplies water to the 11 MG System Control Reservoir
4. Flow in the transmission pipe is controlled by a motor-operated oscillating butterfly
valve adjacent to the Twin Lakes area. The control valve at Casad Dam controls flow
down the streambed to the pipe intake at the McKenna Falls Intake Facility. Both of
these valves can be remotely controlled at the Utility's Olympus facility.
Two transmission mains supported on bridges cross the Port Washington Narrows and
provide water to East Bremerton. A 12-inch water main is supported from the Manette
Bridge, and a 20-inch water main is supported on the Warren Avenue Bridge. A third 18-
inch diameter submarine line crosses from Snyder Avenue to Lebo Boulevard. These
pipelines transfer water from the West 256 Zone to the East 240 Zone.
In 1998, the City of Bremerton completed a new 36-inch diameter transmission main
between Gorst and Reservoir 4. This main replaced a 40-year-old, 24-inch diameter cast
iron main, increased system capacity, and increased chlorine contact times within the
pipe. During this project, the City also constructed an 18-inch diameter transmission
main in Sherman Heights Road linking the 24-inch Sherman Heights transmission main
and an I8-inch transmission main in State Route 3. The 36-inch transmission main
conveys water from McKenna Falls, while the Sherman Heights main conveys
groundwater from the Anderson Creek wellfield.
The 36-inch main and the Sherman Heights main are interconnected and valved at Gorst
to provide better separation of surface water and groundwater supplies and redundant
transmission pathways from both the McKenna Falls and the Anderson Creek wellfields.
This is the first phase of the City's plan to upgrade its primary surface water transmission
system, as the 28-inch diameter steel is nearing the end of its service life. The second and
third phases, included in the City's Capital Improvement Plan for 2006-2025, will replace
the transmission main all the way to the McKenna Falls Intake Facility with 36-inch
ductile iron pipe.
Transmission and Distribution System
5-9
2005 Bremerton Water System Plan
5.6.2 Distribution Piping
The distribution system is a grid of 4- to 12-inch mains comprised of pve, cast iron,
ductile iron, steel, galvanized steel, and asbestos cement. Ductile and cast iron pipe make
up the majority of the system. Flow within the system is generally from west to east. The
system has 1,610 fire hydrants and 5,726 valves throughout to provide Utility customers
with fire protection.
Bremerton has a program to replace substandard mains (defined as <3 inches).
Replacement is prioritized based on head loss, age of pipe, size, maintenance problems,
and customer complaints. Approximately $300,000 is budgeted each year to address
substandard main replacement. Planned projects to address larger main projects are listed
in the appendix as "Distribution Improvements" and are budgeted separately from the
substandard mains.
Cast Iron Ductile AC Galvanized Steel PVC Concrete Copper lfnknown Totals
Iron
1" and . .
smaller 0 0 0 3,700 0 1,248 0 740 331 6,019
2" - 1" 6,492 58 0 37,513 0 15,910 0 565 1 ,734 62,272
3" 7,474 284 0 124 0 2,211 0 0 46 10,139
4" 76,305 40,435 11,672 0 3,019 772 0 0 0 132,203
6" 243,336 122,491 54,606 0 0 867 0 0 0 421,300
8" 235,331 236,970 45,846 0 1,350 501 0 0 0 519,998
10" 19,307 19,240 4,729 0 0 0 0 0 0 43,276
12" 80,770 90,586 12,925 0 1,567 69 0 0 0 185,917
16" 15,927 8,393 0 0 0 0 0 0 0 24,320
18" 0 51,870 0 0 0 0 0 0 0 51,870
20" 1,212 0 0 0 1,061 0 0 0 0 2,273
24" 9,934 15,499 0 0 12,927 0 0 0 0 38,360
27" 0 0 0 0 0 0 4,756 0 0 4,756
28" 0 0 0 0 12,378 0 0 0 0 12,378
30" 0 2,527 0 0 0 0 0 0 0 2,527
36" 0 17,344 0 0 0 0 0 0 0 17,344
Total 696,088 605,697 129,778 41,337 32,302 21,578 4,756 1,305 2, III 1,534,9
52
%of 45.3% 39.5% 8.5% 2.7% 2.1% 1.4% 0.3% 0.1% 0.1% 100.0%
System
Table 5-4
City of Bremerton Main System Pipe Inventory
Linear Feet
Water System Description
5-10
2005 Bremerton Water System Plan
City of Bremerton West 517 Zone System Pipe Inventory
Linear Feet
AC Ductile Iron PVC Galvanized Cast Iron Total
1" and smaller 0 0 67 0 0 67
2"-1" 0 1,000 1 ,631 1,152 0 3,783
4" 239 2,077 0 0 65 2,316
6" 1,159 3,421 0 0 146 4,580
8" 20,412 10,924 0 0 85 31,336
10" 3,536 0 0 0 0 3,536
12" 10,679 2,846 0 0 39 13,525
16" 0 658 0 0 0 658
Total 36,025 20,926 1,698 1,152 335 59,801
% of System 60.2% 35.0% 2.8% 1.9% 0.6% 100%
5.7 Storage
The 16 treated water storage reservoirs are detailed in Table 5-5. Types of construction include
steel and concrete, ground level, buried, and elevated reservoirs. The reservoirs provide peak
demand storage, emergency reserve, and hydraulic gradient control for the system. Interior and
exterior protective coatings are inspected regularly and re-applied when needed.
The Bremerton Main System contains a total o{32 MG of storage capacity, and the West 517
Zone System contains a total of 1.21 MG of storage capacity.
Water System Description
5-11
Reservoir
Name
Description
Table 5-5
City of Bremerton Main System
Summary of Water Storage
Volume MG
Overflow
Elevation
ASL
Water Source
Comments
Union River
Resel"Voir
Twin Lakes
Reservoir 22
4
6
8
II
12
Union River Resel"Voir behind Casad Dam; 130-
foot high concrete dam arch constructed in 1956.
Located by the transmission main from McKenna
Falls. Does not supply water into the system but
rovides rechar e to the Twin Lakes A uifer.
Located on 5000 Road; ground level steel tank
used to supply water to McKenna Falls Intake
Facilit forchlorine injection and screenin .
Below ground concrete reservoir constructed in
1921. Located at 480 I Roosevelt Blvd. in West
Bremelton.
Two concrete above-ground tanks constructed in
1954 and located in Forest Ridge Park at 3200
First Streetin West BremClton.
Elevated steel storage resel"Voir constructed in
1960 located at 5144 Francis Street in West
Bremelton:
Ground-level steel tank constructed In 1973.
Located at 7300 Wemer Road in West Bremelton.
Below-ground concrete tank constructed in 1942.
Located nOlth of Pump Station II at 844 Callahan
in East Bremelton.
Below-ground concrete tank constructed in 1947.
Located at 3029 Olympus Olive in East
Bremelton.
1,400
64 1.7 5
Union River
Main sUltace watCl. source for the City impounds
watCl. fi.om thc City-owned and maintained
watCl"Shed.
WatCl. fi.OIn McKenna Falls is divelted into Twin
Lakes dUling high runotTperiods.
Also refelTed to as the "Head Tank" and is
in screen building. Seismic
Main control reservoir for the McKenna Falls
system. Floating cover replaced and seismic valve
installed in 2002. Su lies the West 256 Zone.
Provides storage tor the West 256 Zone. Exterior
recoated in 1999.
Small resel"Voir works in conjunction with
Resel"Voir 8 to provide storage in Wcst 440 Zone.
ExtClior recoated in 1998. Top 6-8' unusable due
to elevation ditTerenee between Resel"Voir 6 and 8.
Ground-level resel"Voir in the West 440 Zone.
Height increased 40' in 1982. ExtCl-ior reeoated in
1996, intClior in 2005. Seismic u !rade in 2005.
Provides storage to East 240 Zone and water to
Pump Station II. Top once used as a basketball
COUlt is not cUlTentl maintained for this JU1 ose.
Provides storage to the East 398 Zone and supplies
water to Pump Station 12.
Water System Description
5-12
202
265
McKenna Falls Intake
0.20
566.3
McKenna Falls Intake
11.0
Overflow - 48'
McKenna Falls Intake,
Pump Station 2 and
Wells 17 and 20
255.9
3.0
Dia.IOI'5"
Overflow - 25'
241.9
West 256 Zone
0.150
Dia.32'
Height 130'
Overflow - 27.9'
2.54
81' Dia.
Ovcrtlow - 66'
1.58
Depth - 15'
Area = 14,080 ft2
2.0
Depth - 15'
Area = 27,900 ft2
447.3
West 256 Zone Pump
Stations 4 and 17
441.0
West 256 Zone Pump
Stations 4 and 17
239.8
Floats on East 240
Zone and supplied by
West 256 Zone
397.0
East 240 Zone Pump
Stations II and 14
Overflow
Reservo i ,. Water Source Comments
Description Volume (MG) Elevation
Name ASL
0.76 Provides storage to East 398 Zone. Works in
13 Below-ground concrete tank constructed in ] 941. Depth = 13' 398.0 East 240 Zone Pump conjunction with Reservoir 12. Topsoil and grass
Located at 2929 Olympus Olive in East Bremel10n. Stations I ] and] 4
Dia. = ] 00' covered tank; no extetior eXDosed.
Ground-Ieve] steel tank constlucted in 1965. 1.0 Provides storage to the East 490 Zone. Works in
15 Located at ] 925 NE Chetyl in East Bremet10n. Dia. = 8]' 489.5 East 398 Zone Pump tandetn with Reservoir 18. Exterior recoated in
Stations 12 and 13
Reservoir] 8 also located on this site. Overflow = 26' 1997, intClior in 2004.
1.0
Ground-level steel tank constructed in 1976. F]oats on East 240
Dia. - 95' Provides storage to the East 240 Zone. Extet'ior
16 Located in the Tracyton Watet'Shed at 260 238.9 Zone and supplied by
Overflow - recoated in 1997.
Sugarpine Dlive in East BremeJ10n. West 256 Zone
18.5'
Gi'ound-Ievel 1.0
steel tank constructed III 1977. East 240 Zone Pump Provides storage within the East 398 Zonc. Works
Dia. - 95'
] 7 Located at 400 Ridge Lane in East Bremet10n. 398.] Station 16 and Wells 9 in tandetn with Reservoir 20. Intet'ior and cxtcrior
Overflow - 18'
Reservoir 20 also located on this site. and 13 recoated in 1995.
Ground-level steel tank constructed in 1978. 1.0 Provides storage within the East 490 Zone in
18 Located at 1925 Chetyl Street NE East Dia. - 81' 489.4 East 398 Zone Pump tandetn with Reservoir 15. ExtClior recoated in
III
Stations 12 and 13
Bremel10n. Reservoir 15 also located on this site. Ovedlow - 26' 1997.
2.0 Floats on East 240 Provides storage within the East 240 Zone.
Ground-level steel tank constructed III 1979.
19 Dia. - 97' 239.1 Zone and supplied by Extetior recoated in 1997. Seismic upgrade in
Located at 2628 Ash Street in East Bremel10n.
Overflow - 35' West 256 Zone 2004.
1.0
Ground-level steel tank constructed III ]981. East 240 Zone Pump Provides storage to the East 398 Zone. Works in
Dia. - 95'
20 Located at 400 Ridge Lane in East Bremet10n. 398.1 ' Station 16 and Wells 9 tandCln with Reservoir 17. ExteJior recoated in
Overflow - 18'
Reservoir 17 also located on this site. and 13 1995.
3.0
Ground-Ieve] steel tank constructed III 1983. Provides storage to West 256 Zone and Jackson
Dia. - 95' Floats on and supplied
21 Located in NAD Park at 2 132 LakehUl'St Olive in 255.4' Park. Extetior recoated in 1996. Seismic upgrade
Overflow - by West 256 Zone
West Bremel10n. in 2005.
59.5'
1.0
Ground-]evel steel tank constructed in 2003. Dia. - 75' West 440 Zone Pump While demands arc low in the West 650 Zone, this
23 652.3' Reservoir 23 is kept half !low to maintain chlorinc
Located on Utility Road # I 000 in West Bremel10n. Ovedlow - Station 8
residual.
31.5'
Table 5-5 Continued
City of Bremerton Main System Summary of Water Storage
Water System Description
5-13
Overflow
Reservo i r Water Source
Description Volume (MG) Elevation Commcnts
Name
ASL
1.21
Two ground-level steel tanks constlUcted in 1967. Overflow - West 517 Zone Wells Provides storage to the West 517 Zone indusl1ial
10 Located in the Industlial Park at 5785 hnpetial 39.5' 517.4 15, 18, and 19 and park area and the golf course. Recoated in 1997.
I-MG tank transt'e1Ted to BrClllclton in 1999.
Way. Dia. 10 N 66' Pump Station 3
10 S 30' Seismic upgrade in 2005.
Table 5-5 Continued
Bremerton West 517 Zone Water Storage
5-14
Water System Description
2005 Bremerton Water System Plan
Section 6
Operations Program
6.1 Water Utility Organization
6.1.1 Responsibilities
Both the City of Bremerton Main and West 517 Zone Systems are operated by the
Bremerton Water Utility as part of the City of Bremerton Department of Public Works
and Utilities. The Department's organizational chart is shown in Figure 6-1. Within this
organization the responsibilities for operating the Water Utility are as follows:
. The Director of Public Works and Utilities is the Department head for Public Works
and Utilities and reports to the Mayor.
. The City Engineer manages the development and implementation of the Capital
Improvement Program (Crp) for the City's water, wastewater, storm water, and
transportation systems. This position is responsible for engineering aspects of the
water system operation in coordination with Water Resources and field personnel,
develops and maintains the water system hydraulic model, reviews and approves new
connections and developer extensions of the water system, and supervises engineering
personnel. The City Engineer reports to the Public Works and Utilities Director.
. The Water Resources Manager manages water supply and treatment operations which
includes compliance with SDW A, Dam Safety, and Risk Management Program
(RMP) regulations; the watershed control, biosolids monitoring, dam safety,
conservation, and wellhead protection programs; water quality monitoring; corrosion
control (lead and copper); data management and regulatory reporting; reservoir
management; water conservation and customer education; water rights; and water
system planning. This position supervises the Water Resources Operations
Supervisor, Environmental Technicians, and Water Resources Assistant and reports to
the Public Works and Utilities Director.
. The Utility Operations Manager manages field operations and personnel involved in
installing, testing, reading, repair and maintenance of water mains, meters, hydrants
and valves; inspecting and testing of cross connection control systems; implementing
service connections and disconnections; responding to customer service complaints;
maintaining records on field service activity, transmitting field data and information
to appropriate operations staff, and implementing repair schedules and projects for
water equipment and systems, flow and pressure testing; locating underground
facilities; and managing utility inventory and general facilities. This. position
supervises the Distribution Supervisor and Cross Connection Specialist and reports to
the Public Works and Utilities Director.
. The Forestry Manager manages 8,200 acres of utility-owned forest lands, including the
Union River Watershed; controls access and provide watershed patrols; manage
forestry, timber harvest, and biosolids operations. This position supervises the Forestry
Operations Program
6-1
2005 Bremerton Water System Plan
Supervisor and reports to the Public Works and Utilities Director.
· The Water Resources Operations Supervisor monitors and controls daily water system
operations and maintenance for water supplies, chlorination, corrosion control
treatment, reservoirs, and pump stations; schedules work activities; coordinates
related project management; prepares SWTR and Dam Safety compliance reporting;
supervises the Lead Water Operator, Senior Water Operators, and Operators; reports
to the Water Resources Manager.
· The Distribution Supervisor supervises the meter crew and maintenance and
construction crew; coordinates and assigns the work of crews engaged in the
installation, maintenance and repair of the water system including waterlines, valves,
hydrants, meters and other facilities; coordinates testing, flushing, and sampling of
new water mains, connections to existing mains, and installation and operation of
hydrants and related facilities; supervises Service Specialists and Customer Response
personnel; and reports to the Utility Operations Manager.
· The Cross Connection Control Specialist implements the City's Cross Connection
Control Program and reports to the Utility Operations Manager.
· The Utility Billing Supervisor handles billing for the water, wastewater, and storm
water utility funds and reports to the Administrative Manager.
Operations Program
6-2
2005 Bremerton Water System Plan
CITY OF BREMERTON
DEPARTMENT OF PUBLIC WORKS AND UTILITIES
PW&U Funds Involved Ilelude:
001 General FundlGeneral Facilities lDept 49)
001 General FundlEnglneerlng (Dept 61)
401 Water'
451 Wastewater
481 Stormwater'
510 ERR IDepl371
101 Arterial Streets (Dept 41)
102 Streets (Depf42}
. Covers Depts 31,32,34,35,37,38, & 39
Figure 6-1
6-3
Operations Program
2005 Bremerton Water System Plan
6.1.2 Certifications
Regulations require certain Water UtilIty employees to have state water certifications
based on water system size and complexity. For Bremerton, these requirements are:
· Managers responsible for supply/treatment and for the distribution system must each
have a Water Distribution Manager 4 certification.
· Supervisors in charge of shift operations for supply/treatment and for the distribution
system must each have at minimum a Water Distribution Manager 3 certification.
· The water treatment operations supervisor must have at minimum a Water Treatment
Plant Operator 2 certification.
· All water treatment plant operators authorized to make treatment changes must have
at minimum a Water Treatment Plant Operator 1 certification.
· Any employee who provides analyses used for regulatory purposes (such as chlorine
residual and pH) must be "qualified," which according to state regulation, is a person
certified in the state as a Water Distribution Manager or Water Treatment Plant
Operator.
City of Bremerton Water Utility managers and supervisors have the certifications shown
in Table 6-1.
Years with
Job Title Certification Education City
Director Public Works and None required Master's Degree 2
Utilities
City Engineer Washington State BS in Civil Engineering
4
Professional Engineer
Water Distribution Manager 4 Master of Public Health
Water Resources Manager 14
Cross Connection Control Specialist
Water Distribution Mgr4 Waterworks Courses
Utility Operations Manager Cross Connection Control Specialist Journeyman Plumber 32
Backflow Assembly Tester
Water Resources Operations Water Distribution Manager 4 Associate's Degree
25
Supervisor Water Treatment Plant Operator 2 Waterworks Courses
Distribution Supervisor Water Distribution Manager 3 Waterworks Courses 15
Billing Supervisor Water Distribution Manager 3 BS in Business 31
Table 6-1
Water Utility Management and Supervisory Personnel
Water Certifications as of December 2005
In addition to the personnel listed above, other Water Utility personnel have vanous
levels of certihcaiion in water distribution and cross connection coniroL .AIl Water
Utility personnel are encouraged to attend training sessions and gain professional
certification.
Operations Program
6-4
2005 Bremerton Water System Plan
6.2 System Operation and Control
6.2.1 Components
Details on water supplies and transmission and distribution are provided in Sections 3 and
5. Water system component relationships are illustrated in Figures 1-2 and 1-3.
6.2.2 Normal and Alternative Operation
Water operations and maintenance are located in two facilities as described below:
3027 Olympus Drive
100 Oyster Bay Road
Water resources supply and treatment operation Water distribution maintenance
Customer billing Water distribution construction
Engineering Meter reading and maintenance
Environmental monitoring Customer response and dispatch
Administration Cross connection control
Fleet maintenance
Electronics and communications
Inventory control and warehouse
Under normal operation, system data are received and recorded at the Olympus Drive
Water Operations Center via a computerized SCADA system. Alternative operation
typically includes both remote automatic and manual or "hand" operation. In the event of
SCADA failure, facilities can be operated by local hand operation. Operations and
maintenance procedures specifY normal, alternate, and emergency procedures for
operation of supply pumps, booster pumps, disinfection facilities, reservoirs, valves, and
SCADA systems and also contain preventative maintenance and emergency response
plans.
6.2.3 Surface Supply Operations at the McKenna Falls Intake Facility
The McKenna Falls Intake Facility provides redundant disinfection facilities and
automated and remote control of the Union River source of supply based upon system
demands, influent source turbidity, and chlorine residual. The dam outlet valve controls
Union River Reservoir releases. The transmission main Twin Lakes control valve
controls flows from McKenna Falls to Reservoir 4. Operations personnel determine daily
how much surface supply is available after downstream flow requirements are met. After
requirements for the distribution system are determined to maintain adequate pressure and
storage, appropriate adjustments are made to provide flow to the distribution system,
store water in the Union River Reservoir, or divert excess water to Twin Lakes.
Turbidity of the Main Stem, West Branch of the Union River, and the system intake is
continuously monitored. During high turbidity events, the source of high turbidity is
excluded from entry into the transmission system. High turbidity will also trigger a
remote alarm at the Water Operations Center, which results in an automatic shutdown of
water into the transmission main if the intake turbidity stays above a predetermined level
for a set period of time.
Operations Program
6-5
2005 Bremerton Water System Plan
The disinfection system provides redundant disinfection and automatic system shutdown
and standby power. A flow-paced chlorination system is used to maintain the desired
chlorine residual. If the residual drops below a preset value for a set period of time, the
control valve at Twin Lakes will close, excluding the water from the transmission system.
A remote alarm is then sent to the Operations Center. A generator supplies automatic
standby power to motorized gates, valves, chlorinators, water quality analyzers, and
telemetry systems.
6.2.4 Groundwater Supply Wells
Groundwater supply wells are disinfected (with the exception of Well 19) and are
typically used to supplement the McKenna Falls surface water supply as described below:
· All Anderson Creek Wells (lR, 2R, 3, 6R, 7, and 8) pump to the aeration basin at
Pump Station 2 where their supply is disinfected with chlorine.
· Manette Wells 9, 13, 14, and 21 are generally located along South Central Valley
Road in East Bremerton. These wells have the following methods of operation:
Well 9 can be automatically controlled by the level of Reservoirs 17 and 20. It is
generally operated in Hand Mode because of sand production on start up.
Well 13 is automatically controlled by the level of Reservoirs 17 and 20. During
winter months it typically would be set to follow Pump Station 16.
- Well 14 can be automatically controlled by the level of Reservoir 16. It is usually
run in Hand Mode to optimize production to the East 240 Zone.
· Gorst Area Wells, Wells 15, 17, 18, 19, and 20 are located in the Twin Lakes and
Gold Mountain Golf Course area of West Bremerton. All wells have the following
operational characteristics:
- Wells 15, 18, and 19 are automatically controlled by the level in Reservoir 10
serving the West 517 Zone.
Wells 17 and 20 are automatically controlled based on Reservoir 4 level or Hand
Mode operation and pumped into the McKenna Falls transmission main.
6.2.5 Storage Reservoirs
The Bremerton Main System contains 16 finished water storage reservoirs throughout the
distribution system that are detailed in Section 5, Eight of the reservoirs are located in
West Bremerton, and nine are located in East Bremerton. Two additional reservoirs are
located in the West 517 Zone system. Remote level indications and alarms are transmitted
to the Water Operations Center on Olympus Drive. All reservoirs have telemetry
providing infoTInation on levels, signaling operation to appropriate pump stations, and
sending high, low, power outage, and communication failure alarms. Reservoir
information is detailed in Section 5.7.
Operations Program
6-6
2005 Bremerton Water System Plan
6.2.6 Pump Stations
Pump station modes of operation are summarized in Section 5.
6.2.7 Telemetry and Controls
The City of Bremerton utilizes a SCADA system to monitor and control the water supply
and distribution system with a central computer and two redundant master telemetry units
(MTUs). The system facilities utilize either remote telemetry units (RTUs) or
programmable logic controllers (PLCs) to transfer data and signals.
The computer system was first installed in 1992 to begin replacing the older tone telemetry
panel system when the McKenna surface water system information was transferred to the
SCADA system. Later, the system was upgraded to include automatic alarming, paging,
remote accessing, and transfer of communications from telephone to the more economical
radio system. This upgrade is scheduled for completion in 2006.
6.2.8 Preventive Maintenance Program
Preventive maintenance for the Water Resources Division is tracked and scheduled
utilizing maintenance management software (MMS) for the supplies, reservoirs, pump
stations, hydrants, valves, and pipelines. Equipment information includes identification
number, description, location, manufacturer, model and serial numbers, cost, startup date,
and recommended spare parts.
Programmed standard and site-specific preventive maintenance (PM) procedures and time
intervals for each facility and piece of equipment are also entered into the MMS program.
A PM Due Report lists preventive maintenance tasks that should be completed based
upon the last date of service and specified service interval. The PM Due Report can be
requested for any future date and shows all work to be completed before that date.
The MMS will also forecast the number and type of hours needed to complete the
preventive maintenance program for the specified period. Costs can be calculated based
upon hours, materials, and parts.
6.2.9 Equipment, Supplies, and Chemical Inventory
In addition to maintenance functions, the MMS includes a place for a record containing
the name, address, telephone number, and contact for suppliers, including chemical
suppliers.
The Public Works and OtilitiesDepm:tment utilizes a Hazardous Materials
('nrnrnl1nir::ltl'nn~ Frnnlnvpp.R; aht_ Tn_K nn"T nrnOT<lrn .rnnt<l;n;no "Trittpn nrrH'prlllTPC <lnrl
.......................................-............................. .............'-1 .A...J...........t'Jl"-'J............ ............~..... .......... .................'-J." .t'...'-"b...........
..... ......'-'.L...L~.......I.......}..6 ""....I.L.1.........I.}.. l-'..l'-'_.....~.......J.......u IU..................
provides annual mandatory training along with annual updates of the Material Safety Data
Sheets (MSDS).
The primary chemical utilized in the water supply system is chlorine for disinfection.
Gas chlorine in excess of 1,500 pounds is listed as regulated under the Clean Air Act Risk
Management Plan Rule (RMP) and OHSA's Process Safety Management (PSM). In
1999 Bremerton complied with the requirements of the RMP and PSM. Chlorine is
Operations Program
6-7
2005 Bremerton Water System Plan
stored and utilized according to the RMP at McKenna Falls, Anderson Creek, and Wells
15, 17, 18, and 20. Wells 9, 13, and 14 use a 12 percent sodium hypochlorite solution for
disinfection.
The other chemical used in large quantities is 50 percent sodium hydroxide (NaOH) used
to raise pH at the entry to Reservoir 4 to minimize corrosion of customer plumbing for
lead and copper. The NaOH is stored in two 4,000-gallon tanks inside the Corrosion
Control Facility. A separate Operations and Maintenance Manual details operations for
this site.
SARA Title III, Community Right to Know, Tier Two Emergency and Hazardous
Chemical Inventory forms have been completed for each of these sites, and annual reports
are sent to the state, Kitsap County Department of Emergency Management, and
Bremerton Fire Department.
6.2.10 Fluoridation
In 1997, following a public hearings process, the Bremerton City Council voted to
implement water fluoridation as soon as practical. The Water Utility began fluoridation
system design and construction concurrent with the corrosion control treatment design
and construction. Both systems were liquid chemical feed designs, allowing them to be
housed together at Reservoir 4. However, due to considerable negative public response to
the decision, the City Council agreed to re-evaluate and placed the issue on the February
1999 ballot following a citizen petition. Bremerton residents voted down fluoridation.
At the time of the public vote, the fluoridation tank and equipment were in place but not
yet in use. The 6,000 gallon solution tank remains in place, but all the other fluoridation
components have been removed and surplused.
6.3 Water Quality Control and Monitoring
6.3.1 Source Water Quality Protection
Several programs ensure that high water quality is maintained at the source. The
Watershed Control Plan is required by the SWTR and contains the procedures the City
implements to protect the water quality in the Union River watershed. The Wellhead
Protection Plan contains the procedures the City implements to safeguard the water
quality in each of the City's production wells. The recent updates of both the City of
Bremerton and the Kitsap County Critical Areas Ordinances provide further protection of
drinking water sources.
6.3.2 Routine Procedures
1 ne tsremerton water UtllIty has an extensive water quality monitoring program,
administered by the Water Resources Division. Established sampling and testing
programs described in the Drinking Water Quality Monitoring Plan conform to DOH
rpnll;rpmpnt" <I" flpfinpfl ;n 'Xl Ii. r 'M.h_ ?O() 1<.;fr\nl.tnnnn ;n..l11rlp" "<lmnl;nn rpnlll.rerl b"
...........'10..&.1. ...........1..1."'-' .1.~"" L4.LY ......._.L..I..I.................. .I....... .....1....'-' ~ 1'-' ....../ '-'. 1\..&-.......... ...'-'.l........I.b ..........'-'...0..&........
........., 0t,...l..IJ...IP .........0 .........."1'-'- J. '-l J
regulations and conducted for process
compliance with proposed regulations.
monitoring is presented in Section 4.
control and baseline generation to ensure
More detailed information on water quality
Operations Program
6-8
2005 Bremerton Water System Plan
6.3.3 State Reporting
The Water Resources Division is responsible for preparing the following reports for the
Washington State Department of Health:
· Monthly state report on CTs, bacterial sampling, and other requirements
· Quarterly monitoring for disinfectants and disinfection by-products
· Semi-annual report of monitoring for the Lead and Copper Rule
· Annual submittal of the Water Facilities Inventory Form
· Annual report for the Surface Water Treatment Rule
6.3.4 Treatment and Monitoring Violation Procedures
The Utility has established procedures in conformance with public notification
regulations for cases when the system violates a primary water quality standard or fails to
meet treatment, monitoring, and analytical testing requirements. Public notices must
provide a clear explanation of the violation, adverse health effects, remedial action being
taken, and steps the consumer should take to minimize risk. Notices are to be distributed
by newspaper notice, direct mail, or hand delivery within specific time frames depending
on the nature of the violation. If the violation is for acute coliform, nitrate, waterborne
disease outbreak, or other acute violation determined by the department, broadcast media
announcements are required within 24 hours of the violation.
All public notifications need to be closely coordinated with DOH and the Bremerton-
Kitsap County Health District. The Utility has a standard boil water notice to be used in
such an emergency.
6.4 Valve Maintenance
The goal of the water main valve maintenance program is to locate and ensure proper operation
of all the valves in the Bremerton distribution system. Approximately 5,700 isolation valves are
in the distribution system. The Valve Maintenance Program Manual contains the proper
procedures for valve maintenance.
6.5 Hydrant Maintenance
The goal of the fire hydrant maintenance program is to ensure adequate fireflow can be delivered
and hydrant operation can be ensured for fire protection purposes. Approximately 1,600 hydrants
exist within the distribution system. The Hydrant Program Manual contains the proper
nroceduresfor hJvdrant maintenance.
r .
6.6 Flushing Program
The goal of the water main flushing program is to maintain water quality and clarity in the
Bremerton distribution system by removing sediment and mineral buildup on a regularly
scheduled basis. The Bremerton Water Utility Flushing Program Manual contains the proper
procedures for flushing. Generally, each side of the water system is flushed every other year.
Operations Program
6-9
2005 Bremerton Water System Plan
The west side of the Port Washington Narrows is flushed one year, and the east side is flushed
the next. The West 517 Zone system is flushed annually.
6.7 Customer Response and Education Program
Bremerton Public Works and Utilities has a customer response program to promptly and
effectively address the public's questions and concerns on broken mains, low pressure,
discolored water, and other water system issues. A dedicated phone number (473-5920) is used
as the Customer Response Line. A field technician assigned to the Customer Response position
makes customer contact within two to four hours of the call and assesses the initial situation to
provide accurate information to the proper division through a customer response work request.
Customer response activities are logged into a database. Information on customer water quality
concerns and questions are required to be submitted in the monthly report.
In 1999 the requirements for the Consumer Confidence Report took effect, and the Utility's
"Annual Water Quality Report" (Appendix) has been sent annually to all customers. This
opportunity is also used to encourage customers to call the Customer Response Line with
questions and concerns about their water. The Utility has prepared brochures and fact sheets to
give customers regarding emergency preparedness, discolored water, chlorine taste, cross-
connection control, indoor and outdoor water conservation, and leak detection.
In addition to the activities listed above, the Utility is involved in several other customer outreach
activities such as:
· Water Festival for fourth-graders in March
· Kitsap Home and Garden Show in March
· Earth Day Events in April
· National Drinking Water Week activities in May
· National Public Works Week in May
· Kid's Day at the Fairgrounds in June
· Water Purveyors of Kitsap Fair Booth in August
· Washington Water Weeks activities in September
6.8 Cross-Connection Control Program
Cross connections are situations where the drinking water system is connected to some other
vessel or system containing anything other than drinking water.. Such connections have the
potential to allow backflow into the drinking water system and are considered to be cross
connections. Wbere no such potential exists, there is no cross-connection.. The drinking water
system routinely supplies water into contaminated systems, such as commercial sites, and the
contaminated mixtures that result must always be prevented from flowing back to the drinking
HTl)tt:'-r C'"C't~m
\'" Lll-vJ. ...., J rJI..\"/JJ.1.
Operations Program
6-10
2005 Bremerton Water System Plan
Connections to non-drinking water systems can often be avoided entirely by building an air gap.
A typical kitchen sink is a good example of an air gap. The faucet is mounted above the basin,
and the potential for backflow is eliminated. Where air gaps are not possible, a variety of
mechanical devices are employed to eliminate the possibility of backflow. The most common
components of backflow prevention devices are check valves. However, other mechanisms are
also employed, and a wide variety of designs are applied as circumstances require. These devices
are typically redundant by design. For example, a double check valve assembly includes two
valves. If one leaks the other will still provide the needed protection until periodic inspection and
maintenance correct the problem.
New development and redevelopment of properties served by the drinking water system have the
potential to create new cross connections. The backflow prevention devices require inspections
and maintenance. Cross-Connection Control Programs (CCP) address these and other issues.
CCPs are required by Federal, 'State, and local laws. At the Federal level, the SDW A governs
public health related issues associated with water supplies, including the control of cross-
connections. State of Washington drinking water regulations, administered by DOH, are
contained in WAC 246-290-490. Section 490 requires protection of public water systems from
contamination via cross connections. The Code provides ten minimum requirements (elements)
for a CCP, described below. One of these is in regard to establishing the authority to conduct
and enforce the program.
The full picture of cross-connection management is complex and includes building and plumbing
codes, the local or regional health department, private certified backflow-prevention assembly
testers, national organizations and institutions, and others. How Bremerton's program relies on
or coordinates with these other entities is discussed below.
Bremerton has established a CCP to meet requirements in WAC 246-290-490. DOH administers
and enforces this section, which governs activities throughout the public water system up to the
service connections (meters) of individual customers. The Bremerton Department of Community
Development (DCD) and Bremerton's lead Cross-Connection Control Specialist (CCS) enforce
the uniform plumbing code regarding cross connections within individual premises. The CCP
lead coordinates with DCD and the DOH, sharing information as appropriate to contribute to the
public effort to prevent contamination of drinking water via cross connections.
This section has been developed to describe the City's CCP and includes:
· An overview of the CCP
· A description of each ofthe ten program elements required by WAC 246-290-490
· Reference to associated forms, submittals, and other items as necessary
RrptTlPrt{)n' '" rrp },po<ln ;n thP' l<ltp' 1 Q7(\' '" <Inri' h<l'" OT{)nTn 'n,;th thP ",,,,,tpn"l ;'nh--:>"trllC'tllYP -:>nrl
L.J..I...........I..I.........I.\,.'-"...... IJ" '--"'--'..I. ....,.......6'-4........ .1.1..1. ................. .................... ..../, V oJ '-4........~ .1..1.'-4""" 6.1.'-Jl'T.1.1..
"."........1..1. 1,..1..1'-' oJJ0L.......1.J..... .l.l..l.l..l......oJl-.J.~_l-..........l.......'Io.4-J..I.'-I-
increasingly stringent regulations. The program is overseen by the Public Works and Utilities
Department. The Utilities Operations Division is the lead in implementing the program and is
assisted by and shares in the resources of other divisions, including the Engineering and Water
Resources Divisions.
Operations Program
6-11
2005 Bremerton Water System Plan
The program tracks an inventory of over 1,500 backflow prevention devices and typically
reviews more than 150 project submittals each year. The Department has five certified Cross-
Connection Control Specialists and two certified backflow assembly testers on staff.
The program relies on both premise isolation and in-premise isolation to control cross
connections. Within the City, the backflow prevention devices the program is concerned with
are located at both the service connection, where drinking water first flows from the public
distribution system into the private "on-site" plumbing, and at fixtures inside the premises that
may pose potential hazards. The City does not regulate in-premise isolation for customers outside
the city limits.
6.8.1 Cross-Connection Control Program Elements
WAC 246-290-490 requires CCPs to include at minimum, 10 elements to be considered
acceptable. This section describes each of the minimum elements required by
Washington State law and Bremerton's implementation of these elements.
Element 1 - Legal Authority for Cross-Connection Control Program
This element requires awater purveyor adopt a local ordinance, resolution, code, bylaw,
or other written instrument that:
· Establishes the purveyor's legal authority to implement a CCP;
· Describes the operating policies and technical provisions of the CCP; and
· Presents the corrective actj(lns to be used to ensure customers' compliance with the
CCP.
Bremerton 's Status
The City has an established CCP as authorized by federal and state law. Title 15.02.170
of the Bremerton Municipal Code adopts by reference the State of Washington cross-
connection control regulations and subsequent revisions.
The City also issued a Departmental Policies and Procedures document in May 2001 that
established compliance with all of WAC 246-290-490 as the minimum standard for the
scope and goals of the CCP. This procedure establishes two widely used documents as
the primary guiding resources for program details. These documents are:
1. The Cross Connection Control, Accepted Procedure and Practice Manual (most
current edition), published by the Northwest Section of the American Water Works
Association. (Hereafter referred to as the Northwest SectionManual.)
2. The Manual of Cross-Connection Control (most current edition), published by the
Foundation for Cross-Connection Control and Hydraulic Research at the University of
Southern Cali f0111i a. (Hereafter reft;lTi~d to as the use Manual.)
Operations Program
6-12
2005 Bremerton Water System Plan
Element 2 - Evaluation of New and Existing Service Connections
This element requires each purveyor to develop and implement procedures and schedules
for evaluating new and existing service connections. These evaluations must assess the
degree of hazard posed by connections to the purveyor's system, and property owners
must be notified of the results in a timely manner. Once an initial evaluation has been
conducted, service connections must be re-evaluated periodically according to a schedule
acceptable to DOH and whenever there is a change in use of the premises.
Bremerton 's Status
Bremerton's Cross-Connection Control Specialists (CCS) evaluate the degree of hazard
for all new service connections when connections are re-instated after a period of non-use
and whenever a change arises in use of a property served. The City's accounting
department aids in tracking these events and actively provides information to the CCS.
All building permit applications are routed through the CCS, and all divisions of the
Public Works and Utilities Department are made aware of the need to relay information
related to cross-connection control to the specialist. The City has developed a cross-
connection control survey form that facilitates evaluations and record keeping. The
City's plumbing permit process requires that an application for a service connection be
made before the plumbing permit is issued. Utilities Operation Division staff also
perform reconnaissance to find otherwise unreported cross connections, such as home-
owner installed irrigation systems. The CCP database is also used to track new
installations and any pending improvements. Late notices and visits to the premise are
used to ensure resolution. The City reserves the right to install or repair assemblies at the
premise boundary and bill the customer or terminate service if the customer remains
unresponsl ve.
The County's Dcn provides information when solicited, and the Kitsap County Health
District shares information they discover as appropriate. The information from all these
sources is directed to the CCS in order to provide a single-point comprehensive view of
potential cross connections to the Bremerton drinking water system.
All degree of hazard evaluations are conducted by a certified CCS employed by the City.
Procedures include a site visit, interview with the owner or operator of the premises (or
their representative), evaluation of the condition of existing backflow prevention devices,
and consideration of the types of premises and related activities recognized as high health
hazards in Table 9 of WAC 246-290-490. These evaluations also take into consideration
relative probability of occurrence and other variables described in the Northwest Section
and USC Manuals. All evaluations are documented and filed, and copies are provided to
the owner of the premises within 30 days of the site visit.
More information on recordkeeping and responses to the results of hazard evaluations is
discussed under other program elements below.
Operations Program
6-13
2005 Bremerton Water System Plan
Element 3 - Cross-Connection Elimination, Control, and Prevention
This element requires cross connections to be eliminated whenever possible or, where
they cannot be eliminated, that approved backflow assemblies commensurate with the
degree of hazard be properly installed.
Bremerton 's Status
Bremerton fulfills the requirements of this program element by the same basic approach
employed to evaluate the degree of hazard (described above). This is primarily through
the project/plan review process, other methods of collecting information, and
enforcement of regulation and policy. Certain types of potential cross connections are
prohibited, and air gaps are required wherever they are plausible. Where air gaps are not
plausible, the results of the hazard evaluation and the following requirements and
guidelines are used to determine the type of backflow prevention device required and the
approved models available to choose from:
· Tables 8 and 9 ofW AC 246-290-490
· DOH Publication 331-137, Backjlow Prevention Assemblies Approved for
Installation in Washington State, Revised February 2005
· The Northwest Section Manual
. The USC Manual
Element 4 - Cross-Connection Control Personnel
This element requires the purveyor to ensure that personnel are provided to develop and
implement the CCP. At least one must be a certified CCS.
Bremerton 's Status
Bremerton's staff holds all CCP-related required certifications, and the City funds
training commensurate with current and future program needs. The Utility Operations
Manager and the lead CCS are both CCS certified. The CCS lead and other employees
are backflow assembly testers (BATs).
The CCS lead or persons under his direction implement, update, and otherwise manage
the CCP. Contributions to the program come from staff in the administrative,
engineering, and water resources divisions. Members of the Utility crews are also aware
of and support the program.
Element 5 - Backflow PreventerInspection and Testing
The water purveyor must ensure that approved backflow preventers are inspected and
tested for proper operation in accordance with WAC 246-290-490. Specific requirements
related to inspection and testing and Bremerton's methods for complying with them
include:
· Confirming the type of back flow preventer is commensurate with the assessed degree
of hazard.
Operations Program
6-14
2005 Bremerton Water System Plan
Bremerton 's Status
Bremerton ensures scheduled tests, and the results of testing indicate the correct type
of device is installed for the subject premise or application. The degree of hazard
assessment itself is performed separately and discussed above.
· Confirming the installation/configuration is correct and the make and model of the
device (where applicable) is on the approved list.
Bremerton 's Status
These activities are associated with the actual testing of devices and are conducted
primarily by private, certified BATs. Each new assembly is verified after it is
installed. If the assembly is replaced, then the replacement is verified when test
results are entered. Certified Bremerton personnel also evaluate the devices
(including air gaps) by these criteria whenever they inspect.
· Conducting inspection and testing:
When installed
- Annually thereafter (with certain specific exceptions)
- After any backjlow incident
- After repair, relocation, etc.
By certified BA Ts
- By acceptable methods (e.g., as outlined in the use Manual)
Bremerton 's Status
Bremerton assures these elements by following the project/plan review process
mentioned above; keeping an inventory of all devices; scheduling, requiring and
reviewing the tests; and requiring all testing be completed by certified BATs.
· Effectively documenting inspection and testing results.
Bremerton 's Status
Bremerton requires BATs to report their results on a "Backflow Assembly Test
Report" that prompts for all essential information and facilitates record keeping and
use of data;
· Requiring and enforcing corrective actions whenever the backflow preventer IS
discovered to be inappropriate, incorrectly installed, or in need of repair.
Bremerton's Status
Bremerton seeks cooperative solutions with all customers but has the authority to
discontinue water service until required improvements are complete. Bremerton
Operations Program
6-15
2005 Bremerton Water System Plan
exercises this authority according to risk. If emergency conditions or immediate
health hazards exist, service may be terminated immediately. In circumstances where
the degree of hazard is low, Bremerton requires improvements to be made as soon as
possible but allows the customer up to 90 days to complete improvements.
Enforcement actions are initiated by the CCS, who informs the Director of Public
Works and Utilities and the building department, who in turn may contribute to the
process. Every corrective action item is tracked through resolution and facilitated by
letters and phone conversations as necessary.
Element 6 - Quality Control Assurance Program
The water purveyor is required to develop and implement a quality control assurance
program for the testing of backflow prevention assemblies. Certified BATs are required
to take steps to control the quality and reliability of their work, and purveyors, such as
Bremerton, are required to assure they do so. The program must include at a minimum
documentation of tester certification and test kit calibration, standard requirements for the
contents of test reports, and requirements for submitting completed test reports in a timely
manner.
Bremerton 's Status
Bremerton posts a list of approved testers who request to be on the list on the City's
website (www.ci.bremerton.wa.us) and updates it periodically as a public service.
Bremerton keeps copies of up-to-date certifications and test kit calibration results on file
for the BATs who are on the published list. Any Washington State certified BAT may
test assemblies in Bremerton's service area, but those who are not on the list must submit
copies of current certification and test kit calibration with each report. The City notifies
property owners of the need for testing about 30 days before the due date. If no report is
received within that period, the property owner is notified through a late notice,
establishing a deadline of 10 days after the late notification. If the property owner does
not comply, the CCS follows up with a site visit or phone call. Problematic results are
followed up with a phone call to the tester and possible inspection of the assembly in
question.
Element 7 - Backflow Incident Response
The water purveyor is required to develop and implement procedures for responding to
backflow incidents.
Bremerton's Status
The BremertonDepartment of Public Works and Utilities is prepared to respond to a wide
variety of incidents related to the drinking water system. Evidence of poor water quality
or possible contamination is resolved on a case-by-case basis. The methods Bremerton
would employ in such cases are standard in the industry and include (but are not
necessarily limited to) isolation/termination of source, flushing, containment by main
isolation, water quality testing, customer notification, and coordination with other
departments and agencies. Bremerton also has an Emergency Response Plan that would
Operations Program
6-16
2005 Bremerton Water System Plan
apply in some instances of contamination due to cross connection.
Element 8 - Consumer Education
This element requires a water purveyor to educate consumers about cross connections.
The WAC recognizes that purveyors must have a broader public education program and
requires information on cross connections be a part of it. Examples of educational
materials include bill inserts, pamphlet distribution, and consumer confidence reports.
Bremerton 's Status
Information on cross connections is included in Bremerton's annual consumer confidence
report. New customers receive brochures, and the City has conducted public outreach at
events such as fairs. Brochures are also available in the lobby of the Public Works and
Utilities Department, and information is mailed to any customer who inquires about cross
connections or related issues. Whenever a premise is inspected, the owner of the premise
receives a brochure and other information as appropriate.
Element 9 - Record Keeping
This element requires purveyors to keep up-to-date records documenting cross connection
efforts and information, including:
. A master list of service connections where backflow preventers are installed, as well
as the assessed hazard level for the premises and the type (category) of backflow
preventer( s) required for each;
. Detailed information on each individual air gap, backflow assembly, and atmospheric
vacuum breaker, including (as applicable):
Location
Date of installation
History of inspections with results and inspector's name
Product specific data, including model, size and serial number
. CCP summary reports and backflow incident reports per WAC 246-290-490.
Bremerton 's Status
Bremerton has a record keeping system designed to be responsive to these codified
requirements and includes all the necessary types of information. The effort to make it
complete and keep it up-to-date is ongoing. Air gaps and backflow assemblies are being
incorporated into the data base as they are being installed and discovered. Bremerton also
submits an annual CCP report to DOH.
Element 10 - Reclaimed Water
Under this element, purveyors that distribute or have facilities that receive reclaimed
water within their service area must abide by additional cross
ro."'.............. ,"",ro.f~ r.......... ........--........+....,.." 1
lvUIUl\"''vUVll \....oVllll VI
Opera/ions Program
6-17
2005 Bremerton Water System Plan
requirements imposed by the DOH under a permit issued in accordance with Chapter
90.46 RCW (reclaimed water use permits).
Bremerton's Status
Currently, one private facility receives reclaimed water directly from Bremerton's
wastewater treatment plant through pipelines not connected to the drinking water
distribution system. These facilities, however, are also served by the drinking water
system (via separate connection). Bremerton Public Works and Utilities coordinates the
cross-connection control provisions of the reclaimed water use permit with the CCP
associated with purveying drinking water. The CCP data base includes information on
which premises receive reclaimed water, and the CCS considers this information during
evaluations of degree of hazard.
6.9 Safety Program
The Department of Public Works & Utilities produced a Departmental Safety Manual as an
addition to the City's Accident Prevention Program. Although the City's Program is
comprehensive in requirements for Confined Space Entry, Hazardous Material Communications,
Job Hazard Analysis, Motor Vehicles, etc., the Departmental Manual takes into consideration
those tasks unique to Public Works and Utilities Operations and expands safety requirements
accordingly. Some specifics of the Departmental Manual not covered by the City's Program are:
. Heavy equipment operation
. Hazardous material/chemical handling
· Hazard control
. Specific responsibilities of both supervisors and employees
. Tools and equipment
. Job site safety
· Vehicles:
Driver qualifications
Accidents and accidentinvestigations
Excavating and trenching
The Departmental Safety Manual is continuously reviewed by the Department Safety Officer and
updated as necessary.
h 10 Tr;lininn
-..- .._......~
All Water Utility personnel are encouraged to seek training pertinent to job responsibilities. In-
house training offered to employees on a regular basis includes first aid/CPR, flagging, chemical
right-to-know, self-contained-breathing-apparatus use, and blood borne pathogen awareness.
Division managers are responsible to ensure their employees receive at least monthly safety
sessions. The Public Works and Utility Department has a budget for outside training and a policy
for limited support of college level, job related classes taken during off duty time.
Operations Program
6-18
.,
2005 Bremerton Water System Plan
6.11 Involvement in Professional Organizations
The Water Utility is a member of the following organizations:
· American W ater Works Association
· American Water Resources Association
· American Public Works Association
· Groundwater Foundation
· Association of State Dam Safety Officials
· Washington Water Utility Council
· Evergreen Rural Water of Washington
· Partnership for Water Conservation Puget Sound
· Water Purveyors Association of Kitsap County
6.12 Other Operation and Maintenance Responsibilities
Tables 1-4 and 1-5 summarize operation and maintenance responsibilities that have been
assumed by the City of Bremerton for contract customers.
6.13 Emergency Response Program
6.13.1 Standby Personnel List
The Bremerton Water Utility has Telemetry Alarm Standby and Utility Operations
Standby Schedules listing primary and secondary water utility personnel for both
telemetry alarms and distribution problems. Tne list specifies the weeks assigned to
standby, names, phone numbers, pager numbers, and addresses. Advisory staff is listed
for standby personnel to contact depending upon the nature of the problem. This standby
list is used by the CENCOM 911 Center when an after-hours emergency call through the
911 system or from the SCADA system is received.
6.13.2 Vulnerability Analysis and Emergency Planning
The Public Health Security and Bioterrorism Preparedness and Response Act of2002
requires community water systems .to conduct vulnerability assessments (VA) under the
authority of the U.S. Environmental Protection Agency. The law also requires water
utilities to develop a new Emergency Response Plan (ERP) or enhance an existing ERP
within six months of completing the V"I'1~.
The VA process evaluates susceptibility to potential threats and identifies corrective
actions that can reduce or mitigate the risk of serious consequences from adversarial
actions such as vandalism, insider sabotage, or terrorist attack. This assessment takes into
Operations Program
6-19
2005 Bremerton Water System Plan
account the vulnerability of the water supply, transmission, treatment, and distribution
systems. It also considers risks posed to the surrounding community related to attacks on
the water system. An effective V A provides a prioritized plan for security upgrades,
modifications to operational procedures, and policy changes to mitigate the risks and
vulnerabilities to the Utility's critical assets. The V A provides a framework for
developing risk reduction options and associated costs.
The Bremerton Water Utility used the RAM-W method for developing a VA. This
process was detailed, required extensive documentation, and consisted of several steps
which complied with the following six basic elements required for the VA: .
1. Characterization of the water system, including its mission
2. Identification and prioritization of adverse consequences to avoid
3. Determination of critical assets
4. Assessment of the likelihood of malevolent acts from adversaries
5. Evaluation of existing countermeasures
6. Analysis of current risk and development of a prioritized plan for risk reduction
The V A was conducted in-house by a team of City employees representing diverse areas
of water system operations and security expertise. In addition, Bremerton hired a firm
with security expertise to evaluate existing security measures and recommend future
security improvements. EP A has identified eight core elements common to an ERP that
form the basis for responding to any major event:
1. System specific information
2. Water system roles and responsibilities
3. Communication procedures: Who, What, and When
4. Personnel safety
5. Identification of alternate water sources
6. Replacement equipment and chemical supplies
7. Property protection
8. Water sampling and monitoring
The purpose of the ERP is to identify planning and specific response actions to be taken
during an emergency that \yill maintain quantity and quality of water, protect employees,
minimize disruption to the public, and preserve property. This document addresses water
emergencies that will behandled prinlarilyby the Utility as well as the Utility's support
and cooperation with other agencies during large-scale emergencies.
Casad Dam and Reservoir 4 are regulated by the Department of Ecology Dam Safety
Section. The Utility has specific plans (Bremerton Dam Safety Emergency Action Plan and
the Reservoir 4 O&M Plan/Emergency Action Plan) addressing dam safety. The Utility
also has a specific emergency response plan for chlorine handling at the McKenna Falls
Intake Facility as required by the RMP and PSM regulations described earlier.
Operations Program
6-20
2005 Bremerton Water System Plan
System failure prevention is accomplished by modern system design, watershed control and
management, backup power supplies at critical locations, scheduled maintenance and
replacement, water quality sampling and testing, remote system monitoring, routine facility
inspection, automatic and manual control redundancy, and Utility personnel safety and
operational training.
Although the system design criteria include consideration of equalizing, standby or
emergency and fire storage, there is always the remote possibility of a combination of
events such as an earthquake causing significant system damage along with a large
numbers of fires. Additionally, any facility could be out of service for a short period of
time for planned maintenance and for a potentially longer period of time for unplanned
maintenance.
The most likely vulnerability for the water system is a large earthquake, as the probability
of a large earthquake in the region is high. In the past five years, several earthquakes of
magnitude up to 6.8 (February 2001 Benioff earthquake) have occurred. In 1997 the Utility
conducted an Earthquake Vulnerability Analysis, which identified projects and budget
estimates to upgrade transmission lines, reservoirs, and other system components to better
withstand earthquakes. In 1996 several City and Utility staff members attended the FEMA
earthquake simulation training in Maryland.. and will attend another FEMA training
scheduled for 2006.
6.14 Operation and Maintenance Improvements
The following improvements to the operation and maintenance of the Bremerton water system
are planned in the next six years or are already underway:
. Continuation of the security upgrades identified in the VA
. Design of the ultraviolet system for compliance with SWTR regulations
fit Improvements to disinfection and evaluation of chlorine gas alternatives
. Upgrade of the SCADA to a fully PLC-based system
Capital improvements are detailed in Chapter 9.
6.15 References
Bremerton Casad Dam Operations and Maintenance lYfanual, as updated.
Bremerton Coliform Monitoring Plan, as updated annually.
Bremerton Corrosion Control Study, 1995.
Bremerton Dam Safety Emergency Action Plan, updated annually.
Bremerton Flushing Manual. 1994.
Bremerton Inorganic/Organic Monitoring Plan, as updated annually,
Operations Program
6-21
2005 Bremerton Water System Plan
Bremerton Municipal Code.
Bremerton Reservoir 4 Operation and Maintenance Manual/Emergency Action Plan. 1996
Bremerton Water System Earthquake Vulnerability Assessment. Dames and Moore. 1997.
Bremerton Watershed Control Plan. 2006.
Bremerton Wellhead Protection Program. AGI. 1996.
City of Bremerton Emergency Operations Plan. 2006.
Clean Air Act Risk Management Plan Rule.
Department of Public Works and Utilities Safety Manual.
Hydrant Program Manual. 1998
OSHA Process Safety Management.
PNWS - A WWA Cross Connection Control Manual.
SARA Title III
Valve Maintenance Program Manual.
Operations Program
6~22
2005 Bremerton Water System Plan
Section 7
Performance and Design Criteria
7.1 System Demands
Bremerton's average day demand (ADD) for 2004 was 7.7 MGD. This includes contract
distribution of water to other districts and to the Puget Sound Naval Shipyard (PSNS). The
average water use in the Bremerton Water Service area is approximately 183 gallons per day per
equivalent residential unit (ERU).
The highest maximum daily demand (MDD) between 1999 and 2004 was approximately 15
MGD. The ratio of this demand to the average daily demand is approximately 1.8. For purposes
of analyzing the water system, the ADD will be multiplied by 2.0 to determine MDD, and the
following assumptions will be used:
. Residential Average Day Demand = 200 gallons per day per ERU
. Residential Maximum Day Demand = 400 gallons per day per Single Family Unit
· Peak Hourly Demand Multiplier =1.74 (PHD:MDD)
7.2 Pipe Sizing Parameters
Water system pipelines are to be designed to limit velocities to 8 feet per second (fps) under peak
hourly demand flow conditions. During normal average day demand flow conditions, the
velocities should be limited to 5 fps. Pipelines must also be sized to pass fire flows with
velocities less than 10 fps and without residual pressures dropping below 20 psi. The minimum
pipe size for water lines is 6 inches for looped portions of water mains and 8 inches for dead
ends. Also, fire hydrant leads less than 50 feet in length shall be at least 6 inches in diameter.
7.3 Fire Flow Standards
A major function of the water supply and distribution system is to meet fire flow demands. This
section summarizes the fire flow requirements applicable to the Bremerton water system, which
serves areas both inside the city limits and in unincorporated Kitsap County. Bremerton serves
water to residential and commercial structures in three fire districts:
. City of Bremerton (within city limits)
· Central Kitsap Fire and Rescue (north of the city limits)
. South KitsapFireand Rescue District #7 (south ofthe city limits and Port of Bremerton)
The Bremerton Fire Department adopted by ordinance Appendices Band C of the International
Fire Code (IFC), listed in Table BI05.1 in the IFC. The Kitsap County Fire Marshal's office
adopted a separate fire flow and hydrant placement, Ordinance 323(A)-2005, amending the IFC.
Water System Description
7-1
2005 Bremerton Water System Plan
The fire flow requirement for specific projects IS dependent on many factors, including the
following:
. Size of the structure( s)
. Location of the project
· Type of construction materials
· Number of stories
· Building fire protection systems (sprinklers, automatic fire doors, etc.)
. Proximity of adjacent structures
· Type of building occupancy (storage of flammable materials, etc.)
For purposes of this water system plan, minimum fire flows to be provided by the Bremerton
water system have been identified as:
Residential
Commercial
1,000 gpm for 2 hours
I ,500gpm for 2 hours
Fire flows required by the IFC are considered minimums for new construction. When evaluating
new construction, Bremerton Public Works and Utilities Department personnel shall determine
the ability of the water system to meet fire flow requirements at that location with a minimum of
20 psi residual pressure throughout the distribution system. If the water system cannot provide
the required fire flow for the specific project, the developer is required to revise building
construction and/or make the necessary improvements to the distribution system to meet the
project's fire flow requirements as established by the Fire Marshal.
The Washington Survey and Rating Bureau is a non-profit organization funded by subscribing
property insurance companies in accordance with the Washington State Insurance Code. They
are tasked with rating the fire fighting and protection abilities for municipalities. This rating is
then used by insurance companies for setting rates. The water system's capability is 39 percent
of the total rating score. Bremerton's last survey was completed in 1997, and the water system
ranked as Class II, an excellent rating.
The hydraulic analysis of fire flows for the Bremerton water system is discussed in Section 8, fire
flow and storage requirements. Bremerton analyzed storage capacity without nesting fire
suppression and emergency standby storage.
7.4 Backup Supply/Systems
It is highly desirable to have as much redundancy as economically feasible within the water
system. This is particularly true with respect to meeting fire flow requirements. Frequently, fires
and system disruption can occur as a result of natural disasters such as earthquakes. Power
outages, regardless of cause, can severely impact fire fighting efforts if a pump station is affected,
or if fire fighting water is supplied from a nearby well. For these reasons, the City of Bremerton
employs the following system redundancy measures:
Water System Description
7-2
2005 Bremerton Water System Plan
. Redundant components in the surface supply disinfection facilities.
. Multiple wells in each of several wellfields located in different aquifers.
. Multiple pumps (two minimum) in all but one pump station (PS14 has only one'pump but has
a backup in PS 11).
. Multiple transmission mains.
. Isolation valves at critical connections and spaced along major transmission mains so that
damaged portions of main can be easily isolated and repaired.
. Multiple storage reservoirs for each major pressure zone except the West 650 Zone. This
zone has one reservoir but currently has excess capacity for that zone.
. A looped distribution piping system.
. Multiple water mains serving large major customers such as the Navy and Harrison Hospital.
. An adequate number and location of fire hydrants.
. Adequate storage of water in reservoirs to supply fire flows.
. A vailabilityofback-up emergency power for wellfields, pump stations, and booster pump
stations (depending on available storage) and transfer switches for generator connection.
. A 150 kW trailer-mounted generator to move to needed locations.
. Telemetry systems with alarms for critical components in the system and automatic call-out
of operations personnel.
The City encourages future project development to be designed and constructed using fireproof
materials, partitions, and fire sprinklers to minimize fire protection demands. A specific analysis
of the water system is performed for each new development project to determine fire flow
requirements and water system improvements required to provide adequate fire protection.
7.5 System Design Standards
This section presents a summary of the general design criteria for the distribution system. Two
standards documents, "The City of Bremerton Utilities Development and Construction
Standards" and the "Standards for Work in the Rights of Way" are developed by the Department
of Public Works and Utilities. Minimum design standards are also described in the Kitsap
County Coordinated Water System Plan.
This section presents some of the criteria used to analyze the existing and proposed system to
identify any deficiencies that may exist. The analysis of the system will be discussed in more
detail in Section 8.
7.5.1 General
All new developments connecting to the system shall be designed by a civil engineer
registered with the State of Washington.
Water System Description
7-3
2005 Bremerton Water System Plan
The City of Bremerton retains the right to review and approve the design and inspect all
new facilities during construction and prior to being placed in service.
Connections to the existing water system must be in accordance with City of Bremerton
Utility standards.
Service lines shall be installed so each residential, commercial, and industrial structure
has a separate meter. If approved by the City, domestic water consumption may be
measured by a master meter for service to a complex under single ownership and where
water utility line separation is impractical.
7.5.2 Pipelines
Water lines are to be constructed within city or county right-of-ways or utility easements.
These easements should be at least 15 feet wide. Pipelines should be located at least 5
feet inside the boundary of all easements and right-of-ways.
Minimum pipe sizes and velocities were specified previously in Section 7.2.
All pipelines should be looped where possible.
At a minimum, pipe materials should meet A WW A Standard C 100 for ductile iron pipe
and fittings unless approved by the Utility prior to installation.
Transmission mains should be at least 12-inch diameter and not have any service
connections. Larger diameter mains will be required if the Water Utility determines that
a larger diameter is justified based on the hydraulic analysis.
All water mains should have a minimum cover of 36 inches over the top of the pipe.
Minimum separation distances between water mains and sanitary sewer mains should be
ten feet horizontally when the mains are parallel. Adjustments to these requirements may
be allowed if the proposed adjustments are within the latest guidelines published by the
Washington State Department of Ecology.
A minimum separation distance of five feet horizontally is to be maintained between
water mains and storm sewer systems and the water main shall be a minimum of two feet
above the storm sewer when crossing. Lesser separations will be allowed if it is shown it
is not feasible to locate the water main further away.
All new piping should be pressure tested to a minimum of 150 psi over normal working
pressures (but no less than 225 psi total) for 15 minutes per the requirements of the latest
edition of the WSDOT IAPW A Standard Specifications for the State of Washington.
Water System Description
7-4
2005 Bremerton Water System Plan
7.5.3 Automatic Control Valves - Pressure Regulating, Reducing, and
Relief
Automatic control valves are used to intertie the Utility's pressure zones to utilize stored
water at higher elevations and to lower pressures to acceptable service levels.
These valves will be sized to provide the maximum instantaneous demand or the required
fire flow, whichever is greater.
In some areas where the system line pressures exceed 80 psi, it is recommended that
customers install individual pressure reducing valves on their service lines.
7.5.4 Transmission and Distribution Piping Valves
A sufficient number of valves are installed in the system to allow isolation of the system
for maintenance and repair. As a guideline, valves should be located at all tees and
crosses and have a maximum spacing of 500 feet.
Two-inch minimum air and vacuum release valves should be installed at all high points in
the piping system.
Zone isolation valves should be installed at all zone boundaries. This arrangement could
allow future pressure zone boundary realignment without the need for additional pipe
construction.
7.5.5 Fire Hydrants
Fire hydrants should be 5-1/4 inch or larger. Hydrants should be spaced a maximum of
500 feet apart in residential areas and a maximum of 300 feet apart in multi-family
residential areas, commercial areas, and industrial areas.
Six-inch fire hydrant leads should be no longer than 50 feet. Fire hydrant leads greater
than 50 feet in length shall be 8-inch diameter minimum.
Hydrants should be dry-barrel construction, conforming to A WW A C502, and equipped
with national standard threads or devices.
Fire hydrant type, features, and spacing must be approved by the Utility and fire
protection authorities.
7.5.6 Disinfection and Testing
All new.piping, reservoirs, and appurtenances .must be flushed, disinfected, and tested in
accordance with the standards of DOH, AWWA C600 and DI05, or WSDOT/APWA
Section 7-09.
Water System Description
7-5
2005 Bremerton Water System Plan
7.5.7 Cross Connection Control
Where a possibility of contamination of the potable water system exists, appropriate cross
connection control measures must be taken to protect the water system. Refer to
Bremerton Municipal Code Title 15.02.170 and WAC Chapter 248-54-285, Cross
Connection Control, and Section 6.8 of this WSP.
7.5.8 Other Guidance Standards
The following are other standards (latest editions) used in the design of the Bremerton
water system:
. Washington State Department of Health Water System Deign Manual
. Washington State Department of Transportation Road and Bridge Specifications
. American Water Works Association Standards
. NSF Listings for Drinking Water Treatment Chemicals and System Components
. State Standards for Water Works (10 states)
. Kitsap County Coordinated Water System Plan
. Washington State Department of Ecology Criteria for Sewage Works Design
Water System Description
7-6
2005 City of Bremerton Water System Plan
Section 8
System Analysis
--
8.1 Hydraulic Analysis
8.1.1 Methodology
The City of Bremerton Main and West 517 Zone Systems were analyzed using the
hydraulic modeling software program WaterCAD 7 Service Pack 2 by Bentley, Inc. The
WaterCAD software is a Microsoft Windows-based program that interfaces with
AutoCAD to allow entry of all system properties and displays them on the monitor as an
AutoCAD drawing file. All modeling calculations are performed within the WaterCAD
program, and the AutoCAD program allows the user to display the results in various color
coding schemes depending on the desired appearance.
8.1.2 System Components
The WaterCAD software allows all of the pipes and junction nodes to be entered into one
complete model, which consists of approximately 2,450 pipes and 1,800 junction nodes,
along with pressure reducing stations, reservoirs, wells, and pump stations. The number
of system components in the model is different from the actual number found in the
Bremerton water system, because some operations are simulated differently in the model
than they are in the existing system. All of the system data, such as pipe diameters,
reservoir areas, and node elevations, were entered into the model by the City based on
water system maps. A copy of the model input data and a map showing the node and
pipe numbers are contained in a separate document.
8.1.3 Current System Demand
When the model was originally developed in 1999, the City was divided into 62 separate
meter zones reflecting similar residential and commercial demands throughout the
system. The boundaries of the meter zones were overlaid onto the water model to
establish the number of junction nodes in each zone. Demands Were allocated to the
nodes in each of the meter zones by using residential demands for the entire meter zone
divided by the number of nodes in the model representing that zone.
The model was updated to reflect present day demands in the following manner:
. All the demands in the model except the PSNS demands were summed to determine
the ADD represented by them.
. Actual PSNS demands were inserted into the model at the nodes representing the
three master meters serving the shipyard.
. The demands at the remaining nodes of the Main System were multiplied by a
correction factor to increase the total demand in the model to the current ADD of 7.9
System Analysis
8-1
2005 City of Bremerton Water System Plan
MGD.
· A second demand alternative was created for the Main System to provide a current
system-wide MDD of 15.82 mgd.
· A separate demand projection was used for the West 517 Zone System, as all its
future growth is commercial and will rely on the development schedule for the South
Kitsap Industrial Area (SKIA), which has not yet begun, and the possible construction
of a NASCAR Race Track, which is still in the very preliminary planning stages.
Residential demands in the model were assigned a diurnal or daily usage pattern based on
the Washington Department of Ecology (Ecology) diurnal curve. Large commercial
demands were assigned either this diurnal curve or a fixed pattern based on the type of
commercial enterprise and probable water usage pattern.
PSNS demands are assumed to follow a fixed usage pattern. This assumption has been
verified through field measurements where the maximum flow through the meters in a
24-hour period exceeds the minimum flow by only 20 to 30 percent.
All commercial demands included in the model were assigned to the nearest junction
node, except for PSNS. PSNS has a commercial ADD of 2.28 MGD distributed among
three different junction nodes representing the three master meter locations. MDD is
assumed to be 2.0 times ADD, fora current PSNS MDD of 4.56 mgd.
8.1.4 Calibration
The Water Utility performed a number of hydrant flow tests throughout the system to
determine flow, static and residual pressure, and pressure drop in known segments of
pipe. For the calibration analysis, a single "snapshot" (steady-state) simulation was used
to calculate flow throughout the system for a single point in time. This simulation
assumes the system reaches equilibrium with respect to flows instantaneously. The
information from the model run was used to compare the static and residual pressures
associated with the model simulations and each hydrant test to determine the accuracy of
the model. Successful calibration of the static pressure indicates network components are
operating correctly, demand is appropriately allocated, and reservoir levels are correct.
Successful calibration of tlle residual pressure and pressure drop during the hydrant tests
indicates pipe roughness coefficients are set at the appropriate level similar to actual
conditions.
Eight hydrant flow tests covering the full system area were performed in the field and
simulated with the model. Table 8-1 shows the results of each hydrant flow test, along
with the results of the model simulations at each location.
System Analysis
8-2
2005 City of Bremerton Water Sysh::m Plan
Table 8-1
Calibration Hydrant Flow Test Results
Residual Pressure Pressure Difference
Location/Pressure Zone Total Flow (gpm) Static Pressure (psi) (psi) (psi)
686 Woods Place Field Results 674 66.00 60.00 6.00
E490 Model Simulation 66.66 65.40 1.26
9365 Central Valley Rd Field Results 769 77.00 67.00 10.00
E398 Model Simulation 75.14 64.41 10.73
13th and Vandalia Field Results 769 110.00 105.00 5.00
E398 Model Simulation 110.30 102.76 7.54
Trenton and Shore Field Results 674 85.00 80.00 5.00
E240 Model Simulation 85.06 82.21 2.85
6790 Peterson Dr Field Results 769 77.00 62.00 15.00
E240 Model Simulation 72.59 65.26 7.33
Ferry Telminal Field Results 1,450 95.00 87.00 8.00
W256 Model Simulation 96.25 87.66 8.59
2530 Rocky Point Field Results 880 70.00 60.00 10.00
W256 Model Simulation 64.95 54.32 10.63
1038 Kitsap Lake Rd Field Results 1,065 108.00 80.00 28.00
W440 Model Simulation 108.85 80.45 28.40
s''ystem Analysis
8-3
2005 City of Bremerton Water System Plan
The first five locations listed in the table are situated in the east pressure
zones of the City and show reasonable agreement between the hydrant test
results and the model simulation results. The static pressures for each of the
five locations during the simulations are consistently plus or minus
approximately 4 psi from the model, indicating that the reservoirs, pump
stations, and PRV s are operating correctly and that demand is allocated
appropriately. The residual pressures and pressure drops are also reasonably
close to the model simulations, indicating that the roughness coefficients are
close to the actual conditions.
The last three locations listed in the table are found in the west pressure zones of the City,
and the simulation for one does not agree with the test results. The hydrant test
conducted at 2530 Rocky Point gave a static pressure of 70 psi, a residual pressure of 60
psi, and a drop of 10 psi. The model simulation showed agreement with the pressure
drop, but it also showed significantly lower static and residual pressures. This indicates
the system is operating properly, but lower pressures are shown in the model than in the
existing system. Several possible explanations for this difference include reservoir
elevations simulated at a lower level in the model than during the field test or incorrect
elevations for the pressure gages. It was not possible to obtain a better correlation
between field and model values with the available calibration information. The City is
investigating the differences between the field results and the model and will edit the
model as needed.
From this information, it appears the model is reflecting field conditions to a level
adequate for planning purposes. The City is continuing to improve the accuracy of the
model for use in design and fire flow analysis for specific new developments. Calibration
of the model will continue as new field tests occur and the data from the field will be
transferred to the model.
8.1.5 Future System Demand
In six years (by 2011), the ADD for the Main System, excluding potential conservation
savings, is expected to increase to approximately 9.15 MOD, and the MDD is forecasted
to be 18.29 MOD. By the year 2024, the ADD is expected to increase to about 11.91
MOD, and the MDD is forecasted to be 23.83 MOD. Again, both of the ADD demands
are based on population and demand forecasts and the assumption that there would be no
savings due to water conservation strategies. For modeling purposes, use of higher
demands throughout the system provides a more conservative result than using the
demands projected using conservation. All of these future demands were allocated in the
water model by setting the demand for the three PSNSjunction nodes and multiplying the
remaining 2005 demand by a constant value to increase the total demand to the forecasted
amount. The demand for each junction node was then entered into different model
scenarios depending on which forecasted year was being modeled.
System Analysis
8-4
2005 City of Bremerton Water System Plan
This assumption does not precisely reflect the projected growth in Bremerton. Growth
will occur at higher rates in selected areas than for the overall city. This allocation of
demands allows a planning level analysis of the water distribution system, with the
understanding that a more detailed model will be used to evaluate specific parts of the
system.
For the West 517 Zone System, future demands are assumed based on planning
documents for SKIA, a commercial development area. Development of SKIA is
dependent on sewer service, which has not been resolved. This industrial area is currently
served by an on-site septic system, which is the current limiting factor to growth.
8.1.6 Modeling Scenarios
The WaterCAD model was constructed with a number of different modeling scenarios to
reflect system demands and piping configurations in years 2005, 2011, and 2024 and
determine the system operation in those years. Table 8-2 shows the scenarios identified
below and lists the overflow and starting elevation for all the reservoirs in the system,
capacity and the status for each pump station and well, and type of simulation performed
(static or extended period).
The following specific scenarios were run:
. Calibration
. Determination of Current CIP Requirements (i.e., improvements needed to mitigate
current distribution system issues)
- Current PHD (existing system)
- Current MDD with Fire Flow (existing system)
- Current PHD (Current CIP)
- Current MDD with Fire Flow (Current CIP)
. Determination of 6-year CIP (i.e., identifY the projects needed by 2011)
- 2011 PHD (2024 CIP)
- 2011 MDD with Fire Flow (2024 CIP)
- 2011 PHD (2011 CIP)
- 2011 MDD with Fire Flow (2011 CIP)
. Determination of20-year CIP (i.e~,improvements needed to mitigate system issues
caused by demands anticipated after 20 years of growth)
- 2024 PHD (Current CIP)
- 2024 MDD with Fire Flow (Current CIP)
- 2024 PHD (2024 CIP)
- 2024 MDD with Fire Flow (2024 CIP)
System Analysis
8-5
"
2005 City of Bremerton Water SY::nem Plan
. ummary 0 Ire ow an ea our cenano ase on lions
.
2005 Average Day 2005 PHO 2005 MOD 2011 PHO 2011 MOD 2024 PHO 2024 MOO
Facility (Calibration) Fire Flow Fire Flow Fire Flow
Tanks: Zone Overflow Elevation Initial Elevation
4 . W256 255.9 253.9 250.3 238.6 249.8 236.7 248.5 228.0
5A W256 241.9 239.9 250.3 238.6 249.8 236.7 248.5 228.0
5B . W256 241.9 239.9 250.3 238.6 249.8 236.7 248.5 228.0
6 . W440 447.2 445.2 435.3 401.5 434.7 399.6 433.4 415.8
.
8 W440 441.0 439.0 435.3 401.5 434.7 399.6 433.4 415.8
10 W517 515.6 513.6 508.7 490.0 504.7 478.4 480.8 477.9
11 E240 239.8 237.8 236.8 232.2 236.7 229.3 236.4 224.8
12 E398 397.0 395.0 394.4 385.3 394.2 384.5 393.6 381.8
13 E399 398.0 396.0 394.4 385.3 394.2 384.5 393.6 381.8
14 (Not in Use) N/A N/A N/A N/A N/A N/A N/A N/A N/A
15 W490 489.5 487.5 485.9 468.5 485.7 467.8 485.2 465.2
16 E240 238.9 236.9 236.8 232.2 236.7 229.3 236.4 224.8
17 E398 398.1 396.1 394.4 385.3 394.2 384.5 393.6 381.8
18 E490 489.4 487.4 485.9 468.5 485.7 467.8 485.2 465.2
19 E240 239.1 237.1 236.8 232.2 236.7 229.3 236.4 224.8
20 E398 398.1 396.1 394.4 385.3 394.2 384.5 393.6 381.8
21 W256 255.4 253.4 250.3 238.6 249.8 236.7 248.5 228.0
23 W650 652.3 650.3 650.2 640.5 650.2 640.5 650.2 640.4
Pump Stations: Zone Caoacitv (I!om) Status During Simulation
2 W256 4,000 On On On On On On On
.
3 Boosted W256 200 On On On On On On On
BS3 Boosted W256 300 On On On On On On On
4 W440 1,500 Off Off Off Off OIT Off OIT
S
Table 8-2
City of Bremerton Hydraulic Model
f F FI d P k H S . B
C dT
System Analysis
8-6
2005 City of Bremerton Water SY:nem Plan
BS6 (I) Hawthom Ave. 120 N/A N/A N/A N/A N/A N/A N/A
.
BS7 (I) Cook Rd. 60 N/A N/A N/A N/A N/A N/A N/A
8 W650 1,750 On On On On On On On
BS9 (1) Quarry St. 60 N/A N/A N/A N/A N/A N/A N/A
10 W517 3,640 Off Off OfT Off Off OIT Otr
II E398 1,400 Off Off Off Off Off Off Off
12 E490 950 Off Off Off Off Off Off Off
13 E490 1,000 On On On On On On On
14 E398 600 On On On On On On On
16 E398 1,250 Off Off On Off On OIT On
17 W440 1,500 On On On On On On On
Wells:
Surface Source W256 12,500 On On On On On On On
2R (I) PS2 800 N/A N/A N/A N/A N/A N/A N/A
3 (I) PS2 400 N/A N/A N/A N/A N/A N/A N/A
6R (1) PS2 1,400 N/A N/A N/A N/A N/A N/A N/A
7 (I) PS2 340 N/A N/A N/A N/A N/A N/A N/A
8 (I) PS2 600 N/A N/A N/A N/A N/A N/A N/A
9 E398 270 On On On On On On On
13 E398 510 On On On On On On On
14 E240 180 On On On On On On On
15 W517 205 OlT Off Off Off Off Off Off
17 W256 735 On On On On On On On
18R W517 375 OfT Off OtT Off Off Off OfT
19 W517 240 OfT OtT Off OtT OtT OtT Off
20 W256 1,150 On On On On On On On
Table 8.2 Continued
I. Not included in hydraulic model
System Analysis
8-7
2005 City of Bremerton Water System Plan
These simulations will produce a Capital Improvement Program for the next 20 years that
will enable the City to surpass the minimum pressures set by DOH and identify the
improvements required within the next six years.
According to WAC 246-290-230, water systems must be designed to deliver PHD at 30
psi at all points in the distribution system with equalizing storage depleted. The
distribution system must also provide MDD plus the required fire flow at a pressure of at
least 20 psi at all points in the pressure zone with equalizing and fire flow storage
depleted. This analysis was achieved in WaterCAD by completing the following actions:
. In general, the model was run in steady-state mode using two different demand
alternatives, depending on the scenario being studied. To determine if the system met
the PHD (minimum pressures of 30 psi), a steady-state simulation was used with
demands set at the peak hour level. Reservoir levels were set at the levels identified
in Table 8-2 to approximate depletion of the equalizing storage. Reservoir levels
controlled the operation of pumps and wells in the system. If a pump would be called
to operate at the reservoir level used in the analysis, it was in operation during the
simulations.
. For the fire flow analysis, a steady-state simulation was used. Reservoir levels were
set at the point where equalizing and fire flow storage are depleted. This reservoir
elevation corresponds to the condition at the end of the fire event. Reservoir levels
controlled the operation of pumps and wells in the system. A fire flow of 1,000 gpm
was desired at all the residential nodes in the system, and 1,500 gpm was desired at
commercial sites. Selected nodes were simulated with higher flow rates, depending
on their locations with respect to commercial/industrial facilities. More information
on the fire flow simulations is provided below.
The MDD scenarios were run with McKenna Falls Intake contributing no more than 18
MGD to the system.
8.2 System Physical Capacity Analysis
System physical capacity is defined by DOH as the components or facilities (i.e., source,
treatment, storage, transmission, and distribution) that either individually or in combination limit
the number of ERUs that can be served. For Bremerton's system, an ERU equals about 200
gallons per day (ADD). The ERU calculation is described in Section 2.4.3. The overall design
goal of maintaining adequate pressure of at least 30 psi in the distribution system at peak hourly
demand and 20 psi under peak hourly demand plus fire flow conditions must be adhered to in
determining physical capacity. A water system's overall physical capacity must be determined in
ERUs from its most Jimiting design element. Bremerton's physical capacity is 56,711 ERUs
based on storage as identified in the calculations summarized in Table 8-3. The description of
the calculation of the physical capacity for each facility is described later in this section.
System Analysis
8-8
2005 City of Bremerton Water System Plan
peCIIC lyslca apaclty In S
Facility Physical Capacity in ERUs
ADD MDD
Water Rights] Qa = 29.2 MGD Qi = 41.1 MGD 146,000 102,750
Source Table 8_42 Qa = 15.3 MGD Q I = 29.0 76,500 72,500
MGD
Treatment Capacity 76,500 73,500
(Disinfection and corrosion control only)
Storage Capacity) (total) N/A 46,118
Table 8-3
Bremerton Water System Physical Capacity Documentation
S "f Ph I C . ERU
I. Does not include supplemental sources for Qa (Wells 8 and 9). Assumes 200 gpdlERU for ADD and 400 gpdlERU
for MDD. See Table 3-6.
2. Assumes firm yield for Qa. Does not include supplemental sources (Wells 8 and 9) or storage. Assumes 200
gpdlERU for ADD and 400 gpdIERU for MDD. See Tables 1-2 and 8-4.
3. This value is the maximum number of ERUs that can be served by existing storage and was developed by changing
the MDD in the Max ERU column ofTables8-5, 8-11, and 8-12 until the Storage Surplus/(Deficiency) value equals
zero. The value for existing storage> 30 psi corresponds to the Equalizing Storage Capacity line and the value for
existing storage . .
>20 psi corresponds to the Total Storage Capacity line. The number of ERUs is calculated from the MDD based on
400 gpdfERU. There are two different values forthe number ofERUs for the existing storage >30 psi and >20 psi.
Note that in the tables one of the storage surplus/(Deficiency) values is zero and the other one is positive. When you
zero the other one, the one that is currently zero will become negative. The MDD total for both storage
surplus/(Deficiency) values was calculated and left in the one with a zero and a positive value in the final table.
Sum oflimiting ERU value for east and west zones (including the West 517 Zone):
Equalizing Storage Capacity (West) Table 8-5
Equalizing Storage Capacity (East) Table 8-11
ERUs
35,355
96,148
131,503
Total Storage Capacity(West) Table 8-5
Total Storage Capacity (East) Table 8-11
24,269
21,849
46,118
The total number does not necessarily reflect the total volume in the pressure zone, but reflects the relative amount of
storage that is available above 30 or 20 psi and the required amount of storage. The number of ERUs that could be
served considering total storage capacity mayor may not be more than the total number that could be served
considering equalizing storage capacity.
The maximum number of ERUsthat could be served with the existing source, treatment, and
water rights is in excess of the existing number of customers projected for 2024( calculations
shown in Table 8-4). The total is limited by storage capacity.
Source capacity is calculated for both ADD and MDD conditions. The difference in source
amount for the two conditions is caused by differing assumptions for the surface source. For
ADD conditions, the capacity of the surface source is limited by the firm yield estimate of the
surface supply (5.6 mgd). For MDDconditions the surface source capacity is limited by the
treatment plant capacity (18.0 mgd). The calculation of source adequacy compares the available
source with the projected demand. The maximum number of ERUs that can be served is
determined when demand and source capacity are equal. The ultimate limiting factor is the lesser
of the totals for ADD and MDD conditions.
System Analysis
8-9
2005 City of Bremerton Water System Plan
Apart from the system-wide storage inadequacy discussed above, specific pressure zones will be
deficient in storage prior to 2024. Detailed storage adequacy calculations are included in Section
8.4. Storage deficiencies are located in the western portion of the system. The CIP contains
items proposed to mitigate the deficiency and increase the system capacity to a level greater than
the proposed 2024 demands.
System Analysis
8-10
2005 City of Bremerton Water Systelll ~Ian'
Table 8-4
Evaluation of Source Adequacy for
Bremerton Water Svstem
Year
2005 2011 2024 Max ERU (4)
Projected ERUs and Demand (gpd) (I)
Equivalent Residential Units (ERUs) (2) 41,065 46,602 69,815 72,594
Average Day 8,308,000 9,783,000 13,958,000 14,513,601
Peak Day 16,616,000 19,556,000 27,926,000 29,037,600
Available Source MDD (gpd) (3)
Surface Supply (12500 gpm) 18,000,000 18,000,000 18,000,000 18,000,000
PIS 2/Anderson Creek Wells (4000 gpm) 5,760,000 5,760,000 5,760,000 5,760,000
Well #9 (270 gpm) 388,800 388,800 388,800 388,800
Well #13 (510 gpm) 734,400 734,400 734,400 734,400
Well #14 (180 gpm) 259,200 259,200 259,200 259,200
Well #15 Pump (205 gpm) 295,200 295,200 295,200 295,200
Well #17 (735 gpm) 1,058,400 1,058,400 1,058,400 1,058,400
Well #18R Pump (375 gpm) 540,000 540,000 540,000 540,000
Well #19 Pump (240 gpm) 345,600 345,600 345,600 345,600
Well #20 (1150 gpm) 1,656,000 1,656,000 1,656,000 1,656,000
Total Available Source (gpd) 29,037,600 29,037,600 29,037,600 29,037,600
MDD Source Surplus/(Deficiency) 12,421,600 9,481,600 1,111,600 0
System Analysis
8-11
2005 City of Bremerton Water Syste... Plan
Available Source ADD (gpd) (3)
SUlface Supply (3,889 gpm) 5,600,000 5,600,000 5,600,000 5,600,000
PIS 2/Anderson Creek Wells (3,310 gpm) (Well 8 Supplemental source) 4,766,400 4,766,400 4,766,400 4,766,400
Well #9 (0 gpm), Supplemental Source only 0 0 0 -
Well #13 (510 gpm) 734,400 734,400 734,400 734,400
Well #14 (180 gpm) 259,200 259,200 259,200 259,200
Well #15 Pump (205.gpm) 295,200 295,200 295,200 295,200
Well #17 (735 gpm) 1,058,400 1,058,400 1,058,400 1,058,400
Well #18R Pump (375 gpm) 540,000 540,000 540,000 540,000
Well #19 Pump (240 gpm) 345,600 345,600 345,600 345,600
Well #20 (1150 gpm) 1,656,000 1,656,000 1,656,000 1,656,000
Total Available Source (gpd) 15,255,200 15,255,200 15,255,200 15,255,200
.
ADD Source Sumlus/(Deficiency) 6,947,200 5,472,200 1,297,200 741,599
Table 8-4 Continued
I. Oemandforecasts from Table 2-4, without conservation.
2. Number of ERUs for specific years from Tables 2-5 and 2-6.
3. Available sourceassunies source pumps are on for 24 hours in a day at the maximum production rate. Pump Capacities aretaken from the City of Bremerton Water Plan. Capacity of SUlface
Supply is
based on treatment plant capacity. ADO capacity (finn yield of source) is based on 5.6 MGO and does not include supplemental sources (Wells 8 and 9).
4. Max ERU based on MOO capacity. Number of ERU is calculated from POD and is based on a system-wide total of 400 gpd per ERU.
System Analysis
8-12
2005 City of Bremerton Water System Plan
8.3 Fire Flow Analysis
One of the features of WaterCAD is the ability to run fire flow simulations at every node in the
system during a single modeling run. The model assigns a fire flow to each node individually,
and determines the available fire flow and residual pressure at that node, the minimum pressure
in that specific pressure zone, and the minimum pressure throughout the entire system.
Using the fire flow options in the model, each node in the Bremerton system was assigned a fire
flow of either 1,000 or 1,500 gpm, depending on whether the area was residential or commercial.
The simulation determined if the flow could be met while maintaining a minimum residual
pressure of 20 psi at all distribution nodes in the system during the 2004 MDD event with water
levels in the reservoirs set at the elevation where equalizing and fire flow storage are depleted.
After performing the fire flow simulation at every node in the system, the nodes that did not
satisfy the required fire flow while maintaining the minimum residual of 20 psi were singled out
for more detailed analysis. This analysis consisted of identifying specific pipe improvements
necessary to provide the required fire flow. The improvements were identified by assigning the
appropriate fire flow to a specific node and color-coding all the pipes according to head loss.
With the fire flow in place, the pipes with the highest head losses were upgraded until the fire
flow requirement was met. The fire flow was then moved to each different node on the
deficiency list, which potentially resulted in additional pipe upgrades to satisfy all fire flow
requirements. Some of the deficiencies were created not by a minimum pressure at the fire.flow
location, but by the minimum pressure being reached at a second node, typically located at a
higher elevation. In this case, the system capacity was increased to meet pressure requirements at
the controlling node.
Areas with a current fire flow deficiency are described below:
o The northern portion of the West 256 pressure zone. The central pipelines serving this area
have been identified for upgrading and are included in the Capital Improvement Plan (CIP)
under "Distribution Improvements."
. A portion of the East 490 pressure zone surrounding Reservoirs 12 and 13.
. A portion ofthe East 490 pressure zone surrounding Reservoirs 17 and 20.
. Southwest Bremerton near the airport in the West 517 pressure zone. The .transmission line
that serves the majority of the area will be increased as this area develops to allow for the
passage of water at fire flow rates. This line is effectively a dead-end line.
After the 2006 fife flow requirements were met by. implementing the pipe improvements, the
2024 MDD was applied to the model, and new fire flow simulations were run to see if any
additional upgrades were necessary. It was found that since the increase in demand from 2005 to
2024 is small compared to thel,OOOgpin fire flow demand, only a few additional upgrades were
necessary. All proposed improvements are included in the CIPunder "Distribution
Improvements. "
With the identified improvements in place, the fire flow simulations indicated a number of nodes
could not meet the minimum requirements. All of these nodes are located in the Boosted West
256 Zone (Lafayette Zone) served by Booster Station 3, which consists of one 300 gpm pump.
System Analysis
8-13
2005 City of Bremerton Water System Plan
A number of other nodes did not meet the minimum fire flow requirements for different reasons.
Six nodes spread throughout the system were unable to meet the 1,000 gpm demand, because
they were located on "dead end" pipes. This means that the pipe ended on the node and did not
loop back into the distribution system. The available fire flow at each of these nodes is close to
the required 1,000 gpm and could be considered adequate. The pipe improvements are included
in the CIP table for the sake of completeness. Each of these improvements should be evaluated
on a case-by-case basis.
8.4 Storage Analysis
DOH requires public water systems to provide sufficient storage to meet any seasonal or diurnal
variations in demand, fire flows, and emergency demands, such as during power outages and
equipment failures. These criteria are outlined in the Washington Water System Design Manual
(Design Manual), 1999. This plan utilizes these guidelines as criteria for determination of
reasonable treated water storage required in each pressure zone.
For a given reservoir design, each of the five storage components listed below must be
considered:
. Operational Storage
. Equalizing Storage
. Standby Emergency Storage
. Fire Suppression Storage
. Dead Storage, if any
Only effective storage may be used in determining actual available or design storage volume.
Effective volume is equal to the total volume minus the dead storage built into the reservoir (and
in Bremerton's case, any unusable storage in the top of Reservoir 6). Total storage volume
required has been interpreted as the sum of Equalizing Storage, Fire Storage, and Standby
(Emergency) Storage at an elevation sufficient to provide 20 psi (static) to the highest customer
in any pressure zone. In addition, equalizing storage is evaluated with respect to providing 30 psi
(static) to the highest customer in a pressure zone. Operational storage is any surplus storage that
is available after subtracting the other required storage components (Exhibit 8-1 in the Design
Manual). For this plan, storage requirements will be developed by pressure zone. The ability to
provide water from reservoirs to lower zones through PR V stations will be included in the
analysis.
While DOH will accept nesting of standby and fire flow storage, the Fire Districts served by the
Bremerton water system prefer the more conservative approach of including both portions of
overall storage separately.
8.4.1 Operational Storage
Operational storage is the volume of the reservoir devoted to supplying the water system
while, under normal operating conditions, the sources of supply are in "off' status.
Operational storage is additive to the other components of storage and provides an
System Analysis
8-14
2005 City of Bremerton Water System Plan
additional factor of safety. The volume of operational storage should be sufficient to
prevent excess pump cycling.
The amount of operational storage in each pressure zone is identified as the surplus
amount in each calculation.
8.4.2 Equalizing Storage
Equalizing storage capacity is utilized to meet the daily (diurnal) variations in demand.
Peak use periods typically occur during the morning and evening hours, especially during
the breakfast and dinner hours. Water is typically withdrawn from storage during these
peak demand periods and replenished during low demand periods in late evening and
early morning hours.
For systems like Bremerton that supply water to storage based upon the reservoir water
levels (on-calI-demand), DOH guidelines specify that the following equation be used to
estimate equalizing storage:
Equalizing Storage (gal) = (PHD ~ Qs) (150 minutes), where:
PHD Peak hourly Demand (gpm)
Qs Source production rate (gpm)
In most cases in Bremerton, Qs is greater than the PHD resulting in a negative value for
Equalizing Storage. In these cases, a value of 15 percent of the Maximum Day Demand
is used. At no time is equalizing storage calculated as less than 15 percent ofMDD.
8.4.3 Standby Emergency Storage
The purpose of standby storage is to provide a measure of reliability should sources fail
or when unusual conditions impose higher demands than anticipated. The volume of
emergency storage required is dependent upon the reliability of the source of supply and
the ability to provide an alternative supply. If the system or zone has multiple sources of
supply, placing the larger supply source out of service and calculating the volume of
water that could be provided by the remaining supply sources in gallons per connection
per day can reduce the standby storage requirement.
For this analysis, the largest source in any pressure zone is taken out of production before
the storage volume is calculated. Booster pump stations in a pressure zone are considered
a source in this analysis. For pump stations, the capacity of the largest single pump is
removed from the total source duringthis calCulation, not the full pump station capacity.
The recommended standby storage should not be less than 200 gallons per equivalent
residential units (ERU). For systems with multiple sources, the standby storage is based
on the following equation:
System Analysis
8-15
2005 City of Bremerton Water System Plan
Standby Storage (gal) = (2* ADD) (N) - tm (Qs- Qd, where:
ADD Average Day Demand/ERU (gpd/ERU)
N NumberofERUs
Qs Sum of all installed and available sources of supply in gpm
QL The largest capacity source available to the system in gpm
tm Time that remaining sources are pumped on the day the largest source is not
available in minutes (assumed as 24 hours)
The larger of the amount calculated in the equation above, or 200 gallons per ERU, is
used for Standby Emergency Storage in this analysis.
8.4.4 Fire Suppression Storage
Water systems are required to construct and maintain facilities capable of delivering fire
flows in accordance with the determination of the fire flow requirements made by the
local . fire protection authority while maintaining 20 psi pressure throughout the.
distribution system. Fireflow requirements are listed in Section 7.3 and range from 1,000
gpm for 2 hours (120,000 gallons) to 5,000 gpm for 4 hours (1,200,000 gallons),
depending on the pressure zone. The magnitude of the fire suppression storage is the
product of the maximum flow rate and duration established by the fire protection
authority having jurisdiction.
The minimum fire suppression storage for systems is the product of the required flow rate
multiplied by the flow duration and is based on the following equation:
Fire suppression storage (gal) = FF (tm), where:
FF = required fire flow rate
tm = Duration ofFF rate
8.4.5 Dead Storage
Dead storage is the volume of stored water not available to all customers at the minimum
design pressures and is excluded from the volumes provided to meet the effective storage.
Dead storage is assumed as that volume which is at an elevation lower than the elevation
necessary to provide 20 psi (static) atthe meter of the highest customer in any pressure
zone. Dead storage has been removed from the total available volume from each reservoir
in the tables that follow.
System Analysis
8-16
2005 City of Bremerton Water Syste," Plan
Table 8.5
Evaluation of Storage Adequacy for Bremerton Water System
Western Pressure Zones (West 256, West 440, and West 650)
Year
2005 2011 2024 Max ERU
Projected ERUs and Demand (1)
Equivalent Residential Units (ERUs) 26,147 29,066 39,864 32,284
Average Day 5,292,962 6,122,705 7,969,554 6,454,090
Peak Day 10,585,923 12,238,719 15,945,800 12,913,599
Peak Hour 18,419,507 21,295,371 27,745,692 22,469,662
Available Source (gpd) (2)
Surface Supply (12500 gpm) 18,000,000 18,000,000 18,000,000 18,000,000
PIS 2/Anderson Creek Wells (4000 gpm) 5,760,000 5,760,000 5,760,000 5,760,000
Well #17 (735 gpm) 1,058,400 1,058,400 1,058,400 1,058,400
Well #20 (1150 gpm) 1,656,000 1,656,000 1,656,000 1,656,000
Total AvaililbleSource (gpd) 26,474,400 26,474,400 26,4 74,400 26,4 74,400
lRequired Storage Calculations
Multi-Source Credit with Existing Source (gpd) (3) 8,4 74,400 8,4 74,400 8,474,400 8,4 74,400
Standby Storage (gal)(4) 5,229,393 5,813,157 7,972,900 6,456,799
Equalizing Storage (gal)(5) 1,587,888 1,835,808 2,391,870 1,937,040
Fire Flow Storage (gal)(6) 960,000 960,000 960,000 960,000
Required Storage
Greater than 30 psi at highest meter (gal) (7) 1,587,888 1,835,808 2,391,870 1,937,040
Greater than 20 psi at highest meter (gal) (8) 7,777,281 8,608,965 11,324,770 9,353,839
System Analysis
8-17
2005 City of Bremerton Water Systelll Plan
Existing Storage Greater Than 30 psi (gal) (9)
Reservoir #4 (255.9') 0 0 0 0
Reservoir #5A (241.9) 0 0 0 0
Reservoir #5B (241.9') 0 0 0 0
Reservoir #21 (255.4') 0 0 0 0
Reservoir #6 (447.2') 48,543 48,543 48,543 48,543
Reservoir #8 (441.0') 1,031,804 1,03 I ,804 1,031,804 1,031,804
Reservoir #23 (652.3') 1,040,937 1,040,937 1,040,937 1,040,937
Total Existing Storage (l1al) 2,121,284 2,121,284 2,121,284 2,121,284
Storage surplusi(Deficiencv) 533,396 285,477 (270.586) 184,245
Existing Storage Greater Than 20 psi (gal) (9)
Reservoir #4 (255.9') 5,378,122 5,378,122 5,378,122 5,378,122
Reservoir #5A (241.9) 45,160 45,160 45,160 45,160
Reservoir #5B (241.9') 45,160 45,160 45.160 45,160
Reservoir #21 (255.4') 755,329 755,329 755,329 755,329
Reservoir #6 (447.2') 167,840 167,840 167,840 167,840
Reservoir #8 (441.0') 1,921,291 1,921,291 1,921,291 1,921,291
Reservoir #23 (652.3') 1,040,937 1,040,937 1,040,937 1,040,937
Total Existing Storage (gal) 9,353,839 9,353,839 9,353,839 9,353,839
Storage Surplus/(Deficiencv) 1,576,558 744,874 (\ ,970,931 ) 0
Table 8.5 Continued
I. Demand forecasts are based on percentage of total demand listed in Table 2-4. ERUs are based on 400 gpdlERU MDD. Total demand for all pressure zones listed in title are
included.
2. Available source assumes source pumps are on for 24 hours in a day, at the maximum production rate. Pump capacities are taken from the City of Breinelton Water Plan.
3. Multi-source credit assumes largest source is out of service.
4. Required standby storage for existing source = greater of (peak day demand - multi source credit) or 200 gallons per ERU.
5. Required equalization storage = greater of 15% of peak day demand or DOH equation:
DOH equation = 150 min. * (PHD - Total available source).
6. Required fire flow storage = flow * duration (4,000 gpm for 4 hours).
7. Total required storage greater than 30 psi is equal to the required equalizing storage.
8. Total required storage greater than 20 psi is equal to the required equalizing storage plus fire flow storage and standby storage.
9. Available storage is adjusted for minimum pressures by pressure zone.
System Analysis
8-18
2005 City of Bremerton Water Systelll Plan
Year
2005 2011 2024 Max ERU
Projected ERUs and Demand (I)
Equivalent Residential Units (ERUs) 2,720 3,024 4,147 4,343
Average Day 550,60 I 636,915 829,034 868,198
Peak Day 1,101,202 1,273,134 1,658,764 1,737,125
. Peak Hour 1,916,092 2,215,254 2,886,249 3,022,597
Available Source (gpd) (2)
Pumping Station #4 (1500 gpm) 2,160,000 2,160,000 2,160,000 2,160,000
Pumping Station # 17 (1500 gpm) 2,160,000 2,160,000 2,160,000 2,160,000
Total Available Source (gpd) 4,320,000 4,320,000 4,320,000 4,320,000
Required Storage Calculations
Multi-Source Credit with Existing Source (gpd) (3) 3,600,000 3,600,000 3,600,000 3,600,000
Standby Storage (gal)(4) 543,988 604,714 829,382 868,562
Equalizing Storage (gal)(5) 165,180 190,970 248,815 260,569
Fire Flow Storage (gal)(6) 960,000 960,000 960,000 960,000
Required Storage
Greater than 30 psi at highest meter (gal) (7) 165,180 190,970 248,815 260,569
Greater than 20 psi at highest meter (gal) (8) 1,669,169 1,755,685 2,038,197 2,089,131
Existing Storage Greater Than 30 psi (gal) (9)
Reservoir #6 (447.2') 48,543 48,543 48,543 48,543
Reservoir #8 (441.0') 1,031,804 1,03 I ,804 1,031,804 1,03 I ,804
Total Existing Storage (gal) 1,080,347 1,080,347 1,080,347 1,080,347
Storal~e Surnlus/(Deficiencv) 915,167 889,377 831,533 819,778
Table 8-6
Evaluation of Storage Adequacy for Bremerton Water System
Pressure Zone West 440
System Analysis
8-19
2005 City of Bremerton Water System Plan
.
Existing Storage Greater Than 20 psi (gal) (9)
Reservoir #6 (447.2') 167,840 167,840 167,840 167,840
Reservoir #8 (441.0') 1,921,291 1,921,291 1,921,291 1,921,291
Total Existing Storage (gal) 2,089,131 2,089,131 2,089,131 2,089,131
Storal~e Sumlus/(Deficiency) 419,963 333,447 50,935 0
Table 8.6 Continued
1. Demand forecasts are based on percentage of total demand listed in Table 2-4. ERUs are based on 400 gpd/ERU MOD. Total demand for all pressure zones listed in title arc included.
2. Available source assumes source pumps are on for 24 hours in a day at the maximum production rate. Pump capacities are taken from the City of Bremerton Water Plan.
3. Multi-source credit assumes largest source is out of service.
4. Required standby storage for existing source = greater of (peak day demand - multi source credit) or 200 gallons per ERU.
5. Required equalization storage = greater of 15% of peak day demand or DOH equation:
DOH equation = 150 min. * (PHD - Total available source).
6. Required tire flow storage = flow * duration (4,000 gpm for 4 hours).
7. Total required storage greater than 30 psi is equal to the required equalizing storage.
8. Total required storage greater than 20 psi is equal to the required equalizing storage plus fire flow storage and standby storage.
9. Available storage is adjusted for minimum pressures by pressure zone.
System Analysis
8-20
2005 City of Bremerton Water SystelIl Plan
Year
200S 2011 2024 Max ERU
Projected ERUs and Demand (1)
Equivalent Residential Units (ERUs) 26,116 29,032 39,818 30,749
Average Day 5,286,757 6,115,528 7,960,2]2 6,147,277
Peak Day ] 0,573,515 ] 2,224,3 73 15,927,108 12,299,715
Peak Hour 18,397,916 21,270,409 27,713,169 21,40] ,504
A vailable Source (gpd) (2)
Surface Supply (12500 gpm) ] 8,000,000 18,000,000 18,000,000 18,000,000
PIS 2/Anderson Creek Wells (4000 gpm) 5,760,000 5,760,000 5,760,000 5,760,000
Well #17 (735 gpm) 1,058,400 1,058,400 1,058,400 1,058,400
Well #20 (1150 gpm) ] ,656,000 1,656,000 1,656,000 1,656,000
Total Available Sourc~ (!!od) 26,474,400 26,4 74,400 26,4 74,400 26,474,400
Required Storage Calculations
Multi-Source Credit with Existing Source (gpd) (3) 8,4 74,400 8,4 74,400 8,474,400 8,474,400
Standby Storage (gal)(4) 5,223,263 5,806,343 7,963,554 6,149,858
Equalizing Storage (gal)(5) 1,586,027 1,833,656 2,389,066 1,844,957
Fire Flow Storage (gal)(6) 960,000 960,000 960,000 960,000
Required Storage
Greater than 30 psi at highest meter (gal) (7) 1,586,027 1,833,656 2,389,066 1,844,957
Greater than 20 psi at highest meter (gal) (8) 7,769,290 8,599,999 11,3] 2,620 8,954,8] 5
Table 8-7
Evaluation of Storage Adequacy for Bremerton Water System
Pressure Zones West 256 and West 440
System Analysis
8-21
2005 City of Bremerton Water Systelll Plan
Existing Storage Greater Than 30 psi (gal) (9)
Reservoir #4 (255.9') 0 0 0 0
Reservoir#5A (241.9) 0 0 0 0
Reservoir #58 (241.9') 0 0 0 0
Reservoir #21 (255.4') 0 0 0 0
Reservoir #6 (447.2') 167,840 167,840 167,840 167,840
Reservoir #8 (441.0') 2,563,204 2,563,204 2,563,204 2,563,204
Total Existing Storage (gal) 2,731,044 2,731,044 2,731,044 2,731,044
Storage Surplus/(Deficiency) 1,145,017 897,388 341,978 886,087
Existing Storage Greater Than 20 psi (gal) (9)
Reservoir #4 (255.9') 5,378,122 5,3 78, 122 5,378,122 5,378,122
Reservoir #5A (241.9) 45,160 45,160 45,160 45,160
Reservoir #58 (241.9') 45,160 45,160 45,160 45,160
Reservoir #21 (255.4') 755,329 755,329 755,329 755,329
Reservoir #6 (447.2') 167,840 167,840 167,840 167,840
Reservoir #8 (441.0') 2,563,204 2,563,204 2,563,204 2,563,204
Total Existing Storage (gal) 8,954,815 8,954,815 8,954,815 8,954,815
Storage Surplus/(Deficiency) 1,185,525 354,816 (2.357.806) 0
Table 8-7 Continued
I. Demand forecasts are based on percentage of total demand listed in Table 2-4. ERUs are based on 400 gpdlERU MOD. Total demand for all pressure zones listed in title are included.
2. Available source assumes source pumps are on for 24 hours in a day at the maximum production rate. Pump Capacities are taken ITom the City of 8remerton Water Plan.
3. Multi-source credit assumes largest source is out of service.
4. Re{juired standby storage for existing sow'ce = greater of (peak day demand - multi source credit) or 200 gallons per ERU.
5. Required equalization storage = greater of 15% of peak day demand or DOH e{juation:
DOH e{juation = 150 min. * (PHD - Total available source).
6. Re{juired fire flow storage = flow * duration (4,000 gpm for 4 hours).
7. Total re{juired storage greater than 30 psi is equal to the re{juired equalizing storage.
8. Total re{juired storage greater than 20 psi is equal to the required equalizing storage plus fire flow storage and standby storage.
9. Available storage assurnes the full amount of storage is available in the upper pressure zone.
System Analysis
8-22
2005 City of Bremerton Water Systelll Plan
Table 8-8
Evaluation of Storage Adequacy for Bremerton Water System
Pressure Zone West 650 (Reservoir 23)
Year
2005 2011 2024 Max ERU
Projected ERUs and Demand (1)
Equivalent Residential Units (ERUs) 125 488 1,275 526
Average Day 24,640 324,438 974,000 40 I ,484
Peak Day 49,280 648,876 1,948,000 802,969
Peak Hour 85,747 1,129,044 3,389,520 1,397,166
A vailableSource (gpd) (2)
Pump Station 8 - 2 pumps (1750 gpm) 2,520,000 2,520,000 2,520,000 2,520,000
Total Available Source (god) 2,520,000 2,520,000 2,520,000 2,520,000
Required Storage Calculations
Multi-Source Credit with Existing Source (gpd) (3) 1,188,000 1,188,000 1,188,000 1,188,000
Standby Storage (gal)(4) 25,000 97,632 760,000 105,111
Equalizing Storage (gal)(5) 7,392 97,331 292,200 120,445
Fire Flow Storage (gal)(6) 540,000 540,000 540,000 540,000
Required Storage
Greater than 30 psi at highest meter (gal) (7) 7,392 97,3 3 I 292,200 120,445
Greater than 20 llsi at highest meter (gal) (8) 572,392 734,963 1,592,200 765,557
Existing Storage G.'eater Than 30 psi (gal) (9)
Reservoir #23 (652') 1,040,937 1,040,937 1,040,937 1,040,937
Total Existing Storage (gal) 1,040,937 1,040,937 1,040,937 1,040,937
Storal!e Sumlus/(Deticiencv) 1,033,545 943,606 748,737 920,492
System Analysis
8-23
2005 City of Bremerton Water System Plan
Existing Storage Greater Than 20 psi (gal) (9)
Reservoir #23 (652') 1,040,937 1,040,937 1,040,937 1,040,937
Total Existing Storage (gal) 1,040,937 1,040,937 1,040,937 1,040,937
Storage Surplus/(Deticiency) 468,545 305,974 (551,263 ) 275,381
Table 8-8 Continued
I. Demand forecasts are based on percentage oftolal demand listed in Table 2-4. ERUs are based on the following: ] 25 residential current plus 50 industrial, 2024 1,125
residential plus 150 industrial. ERU and demand totals for 20 I I based on straight line interpolation between 2005 - 2024.
2. Available source assumes source pumps are on for 24 hours in a day at the maximum production rate. Pump capacities are taken ti'om the City of Bremelion Water Plan
3. Multi-source credit assumes largest source is out of service.
4. Requiredstandbystorage for existing source = greater of (peak day demand - multi source credit) or 200 gallons per ERU.
5. Required equalization storage = greater of 15% of peak day demand or DOH equation:
DOH equation = 150 min. · (PHD - Total available source).
6. Required tire flow storage = flow · duration (1,500 gpm for 2 hours).
7. Total required storage greater than 30 psi is equal to the required equalizing storage.
8. Total required storage greater than 20 psi is equal to the required equalizing storage plus tire flow storage and standby storage.
9. Available storage is adjusted for minimum pressures by pressure zone.
9. Available storage includes all storage within the system and is not adjusted for minimum pressures.
System Analysis
8-24
2005 City of Bremerton Water Systelll Plan
Year
2005 2011 2024 Max ERU
Projected ERUs and Demand (1)
Equivalent Residential Units (ERUs) 1,894 2,106 2,888 4,017
Average Day 383,427 443,535 577,322 802,978
Peak Day 766,854 886,584 1,155,129 1,606,63 I
Peak Hour 1,334,326 1,542,657 2,009,924 2,795,537
.
Available Source (gpd) (2)
Pump Station #12 (950 gpm) 1,368,000 1,368,000 1,368,000 1,368,000
Pump Station #13 (1000 gpm) 1,440,000 1,440,000 1,440,000 1,440,000
Total Available Source (gpd) 2,808,000 2,808,000 2,808,000 2,808,000
Required Storage Calculations
Multi-Source Credit with Existing Source (gpd) (3) 1,728,000 1,728,000 1,728,000 1,728,000
Standby Storage (gal)(4) 378,822 421,111 577,564 803,315
Equalizing Storage (gal)(5) 115,028 132,988 173,269 240,995
Fire Flow Storage (gal)(6) 960,000 960,000 960,000 960,000
Required Storage
Greater than 30 psi at highest meter (gal) (7) 115,028 132,988 173,269 240,995
Greater than 20 psi at highest meter (gal) (8) 1,453,850 1,514,098 1,710,834 2,004,310
Existing Storage Greater Than 30 psi (gal) (9)
Reservoir #15 (489.5') 1,002,155 1,002,155 1,002,155 1,002,155
Reservoir #18 (489.4') 1,002,155 1,002,155 1,002,155 1,002,155
Total Existing Storage (gal) 2,004,310 2,004,310 2,004,310 2,004,310
Storage Sumlus/(Deficiencv) 1,889,282 1,871,322 1,831,041 1,763,315
Table 8-9
Evaluation of Storage Adequacy for Bremerton Water System
Pressure Zone East 490
System Analysis
8-25
2005 City of Bremerton Water Systelll Plan
Existirng Storage .Greater Than 20 psi (gal) (9)
Reservoir #15 (489.5') 1,002,155 1,002,155 1,002,155 1,002,155
Reservoir #18 (489.4') 1,002,155 1,002,155 1,002,155 1,002,155
Total Existing Storal!e (I!al) 2,004,310 2,004,310 2,004,310 2,004,310
Storage: Surplus/(Deficiencv) 550,460 490,212 293,476 0
Table 8-9 Continued
I. Demand forecasts are based on percentage of total demand listed in Table 2-4. ERUs are based on 400 gpdlERU MOD. Total demand for all pressure zones listed in title are included.
2. Available source assumes source pumps are on for 24 hours in a day at the maximum production rate. Pump Capacities are taken from the City of Bremerton Water Plan.
3. Multi-source credit assumes largest source is out of service.
4. Required standby storage for existing source = greater of (peak day demand - multi source credit) or 200 gallons per ERU.
5. Required equalization storage = greater of 15% of peak day demand or DOH equation:
DOH equation = 150 min. * (PHD - Total available source).
6. Required fire flow storage = flow * duration (4,000 gpm for 4 hours).
7. Total required storage greater than 30 psi is equal to the required equalizing storage.
8. Total required storage greater than 20 psi is equal to the required equalizing storage plus fire flow storage and standby storage.
9. Available storage is adjusted for minimum pressures by pressure zone.
System Analysis
8-26
2005 City of Bremerton Water Systelll Plan
Ycar
, 2005 2011 2024 Max ERU
Projected ERUs and Demand (I)
Equivalent Residential Units (ERUs) 7,659 8,515 11,678 13,356
Average Day 1,550,517 1,793,582 2,334,597 2,669,984
Peak Day 3,101,034 3,585,204 4,671,154 5,342,210
Peak Hour 5,395,800 6,238,254 8,127,807 9,295,446
Available Source (gpd) (2)
Well #9 (270 gpm) 388,800 388,800 388,800 388,800
Well #13 (510 gpm) 734,400 734,400 734,400 734,400
Pump Station #11 (1400 gpm) 2,016,000 2,016,000 2,016,000 2,016,000
Pump Station #14 (600 gpm) 864,000 864,000 864,000 864,000
Pump Station #]6 (1250 gpm) 1,800,000 1,800,000 1,800,000 1,800,000
Total Available Source (gpd) . 5,803,200 5,803,200 5,803,200 5,803,200
,
Required Storage Calculations
Multi-Source Credit with Existing Source (gpd) (3) 4,795,200 4,795,200 4,795,200 4,795,200
Standby Storage (gal)(4) 1,531,895 1,702,903 2,335,577 2,671,105
Equalizing Storage (gal)(5) 465,155 537,781 700,673 80 I ,332
Fire Flow Storage (gal)(6) 1,200,000 1,200,000 1,200,000 1,200,000
Required Storage
Greater than 30 psi at highest meter (gal) (7) 465,155 537,781 700,673 80 I ,332
Greater than 20 psi at hi2:hest meter (gal) (8) 3,197,051 3,440,684 4,236,250 4,672,437
Table 8-10
Evaluation of Storage Adequacy for Bremerton Water System
Pressure Zone East 398
System Analysis
8-27
2005 City of Bremerton Water Systell' Plan
Existing Storage GreaterThan 30 psi (gal) (9)
Reservoir #12 (397.0') 635,897 635,897 635,897 635,897
Reservoir #13 (398.0') 338,930 338,930 338,930 338,930
Reservoir # 17 (398.1 ') 311,186 311,186 311,186 311,186
Reservoir #20 (398.1 ') 311,186 311,186 311,186 311,186
Total Existing Storal!e(l!al) 1,597,199 1,597,199 1,597,199 1,597,199
Storage Surplus/(Deficiencv) 1,132,044 1,059,418 896,526 795,867
Existing Storage GreaterThan 20 psi (gal) (9)
Reservoir #12 (397.0') 2,000,000 2,000,000 2,000,000 2,000,000
Reservoir # 13 (398.0') 763,721 763,721 763,721 763,721
Reservoir #17 (398.1 ') 954,358 954,358 954,358 954,358
Reservoir #20 (398.1 ') 954,358 954,358 954,358 954,358
Total Existing Storal!e(gal) 4,672,437 4,672,437 4,672,437 4,672,437
Storage Surolus/(Deficiencv) 1,475,386 1,23"1,753 436,187 0
Table 8-10 Continued
I. Demand forecasts are based on percentage of total demand listed in Table 2-4. ERUs are based on 400 gpd/ERU MDD. Total demand for all pressure zones listed in title are included.
2. Availabk source assumes source pumps are on for 24 hours in a day at the maximum production rate. Pump capacitiesaretaken from the City of Bremerton Water Plan.
3. Multi-source credit assumes largest source is out of service.
4. Required 'standby storage for existing source = greater of (peak day demand - multi source credit) or 200 gallons per ERU.
5. Required equalization storage = greater of 15% of peak day demand or DOH equation:
DOH equation = 150 min. * (PHD - Total available source).
6. Required fire flow storage = flow * duration (5,000 gpm for 4 hours).
7. Total required storage greater than 30 psi is equal to the required equalizing storage.
8. Total required storage greater than 20 psi is equal to the required equalizing storage plus fire flow storage and standby storage.
9. Available storage is adjusted for minimum pressures by pressure zone.
System Analysis
8-28
2005 City of Bremerton Water Systelll Plan
Table 8-11
Evaluation of Storage Adequacy for Bremerton Water System
East Pressure Zones (East 240, East 398, and East 490)
Year
. 2005 2011 2024 Max ERU
.
Projected ERUs and Demand (1)
Equivalent Residential Units (ERUs) 12,928 14,371 19,711 21,849
Average Day 2,617,038 3,027,295 3,940,446 4,367,988
Peak Day 5,234,077 6,051,281 7,884,200 8,739,643
. Peak Hour 9,107,293 10,529,229 13,718,508 15,206,979
Available Source (gpd) (2)
W256 VIA Gravity Main (1,000 gpm) 1,440,000 1,440,000 1,440,000 1,440,000
Well #9 (270 gpm) 331,200 331,200 331,200 331,200
Well #13 (510 gpm) 792,000 792,000 792,000 792,000
Well 14 (180 gpm) 259,200 259,200 259,200 259,200
Total Available Source{gpd) 2,822,400 2,822,400 2,822,400 2,822,400
Required Storage Calculations
Multi-Source Credit with Existing Source (gpd) (3) 1,382,400 1,382,400 1,382,400 1,382,400
Standby Storage (gal)(4) 3,85 J ,677 4,672,189 6,498,492 7,353,576
Equalizing Storage (gal)(5) 785,112 907,692 1,182,630 1,310,946
Fire Flow Storage (gal)(6) 1,200,000 1,200,000 1,200,000 1,200,000
Required Storage
Greater than 30 psi at highest meter (gal) (7) 785,112 907,692 1,182,630 1,310,946
Greater than 20 psi at highest meter (gal) (8) 5,836,788 6,779,881 8,881,122 9,864,522
Existing Storage Greater Than 30 psi (gal) (9)
Reservoir #1 1 (239.8') 0 0 0 0
Reservoir #16 (238.9') 0 0 0 0
Reservoir #19 (239.1') 0 0 0 0
System Analysis
8-29
2005 City of Bremerton Water Systelll Plan
Reservoir #] 5 (489.5') ] ,002,] 55 1,002,155 ] ,002, 155 1,002,155
Reservoir #]8 (489.4') 1,002,] 55 ] ,002,] 55 ] ,002, 155 1,002,155
Reservoir #] 2 (397.0') 2,000,000 2,000,000 2,000,000 2,000,000
Reservoir # 13 (398.0') 763,721 763,721 763,721 763,721
Reservoir #] 7 (398.1 ') 954,358 954,358 954,358 954,358
Reservoir #20 (398.] ') 954,358 954,358 954,358 954,358
Tota] Existing Storage (gal) 6,676,746 6,676,746 6,676,746 6,676,746
Storage Surp]us/(Deficiencv) 5,891,635 5,769,054 5,494,] ] 6 5,365,800
Existing Storage Greater Than 20 psi (gal) (9)
Reservoir # 11 (239.8') ] ,579,776 1,579,776 1,579,776 ] ,579,776
Reservoir #] 6 (238.9') 78] ,839 78] ,839 781,839 781,839
Reservoir #19 (239.1 ') 826,] 60 826,160 826,160 826,160
Reservoir #]5 (489.5') 1,002,] 55 1,002,] 55 1,002,155 1,002, 155
Reservoir #] 8 (489.4') 1,002,155 1,002,155 1,002,155 1,002,155
Reservoir #]2 (397.0') 2,000,000 2,000,000 2,000,000 2,000,000
Reservoir #]3 (398.0') 763,72] 763,72 ] 763,721 763,72 ]
Reservoir #17 (398.1 ') 954,358 954,358 954,358 954,358
Reservoir #20 (398.] ') 954,358 954,358 954,358 954,358
Total Existing Storage (gal) 9,864,522 9,864,522 9,864,522 9,864,522
Storage Surplus/(Deficiencv) 4,027,734 8,956,830 8,681,892 0
Table 8-11 Continued
I. Demand forecasts are based on percentage of total demand listed in Tab]e 2-4. ERUs are based on 400 gpdlERU MDD. Total demand for all pressure zones listed in title are included.
2. Available source assumes source pumps are on for 24 hours in a day at the maximum production rate. Pump capacities are taken from the City of Bremerton Water Plan.
3. Multi-source credit assumes largest source is out of service.
4. Required standby storage for existing source = greater of (peak day demand - multi source credit) or 200 gallons per ERU.
5. Required equalization storage = greater of 15% of peak day demand or DOH equation:
DOH equation = ] 50 min. * (PHO - Tota] avai]able source).
6. Required fire flow storage = flow * duration (5,000 gpm for 4 hours).
7. Total required storage greater than 30 psi is equal to the required equalizing storage.
8. Total required storage greater than 20 psi is equal to the required equalizing storage plus fire flow storage and standby storage.
9. A vailabll: storage is adjusted for minimum pressures by pressure zone.
System Analysis
8-30
2005 City of Bremerton Water Syste." Plan
Year
2005 2011 2024 Max ERU
Projected ERUs and Demand (1)
Equivalent Residential Units (ERUs) . 1,990 3,165 10,240 2,416
Average Day 398,000 633,000 2,048,000 483,234
Peak Day 796,000 1,266,000 4,096,000 966,468
Peak Hour . 1,385,040 2,202,840 7,127,040 1,681,654
A vailable Source (gpd) (2)
Pumping Station 10 (3640 gpm) 5,241,600 5,241,600 5,241,600 5,241,600
Well #15 Pump (205 gpm) 295,200 295,200 295,200 295,200
Well #18R Pump (375 gpm) 540,000 540,000 540,000 540,000
Well #19 Pump (240 gpm) 345,600 345,600 345,600 345,600
Total Available Source (!!od) 6,422,400 6,422,400 6,422,400 6,422,400
.
Required Storage Calculations
Multi-Source Credit with Existing Source (gpd) (3) 1,180,800 1,180,800 1,180,800 1,180,800
Standby Storage (gal)(4) 398,000 633,000 2,915,200 483,234
Equalizing Storage (gal)(5) 207,756 330,426 1,069,056 252,248
Fire Flow Storage (gal)(6) 180,000 180,000 180,000 180,000
Required Storage
Greater than 30 psi at highest meter (gal) (7) 207,756 330,426 1,069,056 252,248
Greater than 20 psi at hi!!hest meter (!!al) (8) 785,756 1,143,426 4,164,256 915,482
Existing Storage Greater Than 30 psi (gal) (9)
Reservoir #10 (515.6') 252,248 252,248 252,248 252,248
Total Existing Storage (gal) 252,248 252,248 252,248 252,248
Stora!!e Surolus/(Deficiencv) 44,492 (78,178) (816,808) 0
Table 8.12
Evaluation of Storage Adequacy for Bremerton Water System
Pressure Zone West 517 (Reservoir 10)
System Analysis
8-31
2005 City of Bremerton Water Systelll Plan
Existing Storage Greater Than 20 psi (gal) (9)
Reservoir # I 0 (515.6') 964,814 964,814 964,814 964,814
Total Existing Storage (gal) 964,814 964,814 964,814 964,814
Storage Surplus/(Deficiencv) . 179,058 (178,612) (3.199,442) 49,331
Table 8.12 Continued
I. Demand forecasts are based on percentage of total demand listed in Table 2-4. ERUs are based on 400 gpd/ERU MOD. Totaldemand for all pressure zones listed in the title is
included.
2. Available source assumes source pumps are on for 24 hours in a day at the maximum production rate. Pump capacities are taken from the City of Bremerton Water Plan.
3. Multi-source credit assumes largest source is out of service.
4. Required standby storage for existing source = greater of (peak day demand - multi source credit) or 200 gallons per ERU.
5. Required equalization storage = greater of 15% of peak day demand or DOH equation:
DOH equation = 150 min. * (PHD - Total available
source).
6. Required fire flow storage = flow * duration (4,000 gpm for 4 hours).
7. Total required storage greater than 30 psi is equal to the required equalizing storage.
8. Total required storage greater than 20 psi is equal to the required equalizing storage plus fire flow storage and standby storage.
9. Available storage is adjusted for minimum pressures by pressure zone.
10. This analysisinch.ides the gravity portion of the West 517 Zone only and assumes the golf course is irrigating.
II. Port of Bremerton Industrial Park is served by a 1,500 gpm fire pump station (Booster Station 10).
System Analysis
8-32
2005 City of Bremerton Water System Plan
8.4.6 Bremerton System Evaluation
The eight previous tables were prepared to analyze the storage adequacy of the Bremerton
system.. The following pressure zones were evaluated as stand-alone features:
· Main System West Pressure Zones (West 256, West 440, and West 650) (Table 8-5)
· Main System West 440 Zone (Table 8-6)
· Main System West 256 and West 440 Zones (Table 8-7)
· Main System West 650 Zone (Table 8-8)
· Main System East 490 Zone (Table 8-9)
· Main System East 398 Zone (Table 8-10)
· Main System East Pressure Zones (East 240, East 398, and East 490) (Table 8-11)
. West 517 Zone (Table 8-12)
The individually listed pressure zones do not currently have the ability to receive water
from higher-pressure zones, so no storage located in higher pressure zones can be used in
their evaluation. The inclusion of an intertie between the West 650 Zone and the West
440 Zone is being considered.
The evaluation of the West 256 Zone includes the storage (and demand) for the West 440
Zone, since water can flow from West 440 into West 256 through a zone intertie (Table
8-7). No increase in storage is available in the upper zone when evaluating the lower
zone, even though the entire volume would be available at greater than 30 psi.
In a similar manner, the evaluation for the East 240 Zone (Table 8-11) includes the
storage and demands for the East 398 and East 490 Zones.
For the most part, the storage in Bremerton meets DOH requirements. Table 8-13
summarizes the results of the storage analysis. The combined western zones will be
deficient in equalizing and total storage by 2018. In the West 517 pressure zone, the
current required amount of equalizing and total storage is met by the existing reservoirs,
but the zone becomes deficient by 2007, assuming development takes place as projected.
If new development arrives in theW est 517 zone, new storage will be needed. The
combination of the West 256 and West 440 Zones will be deficit in total storage (greater
than 20 psi) by 2018, showing a deficit of approximately 2.4 MG by 2024.
All storage requirements (equalizing greater than 30 psi and equalizing plus fire flow and
standby greater than 20 psi) are currently adequate throughout the planning period in the
remaining pressure zones, including all the pressure zones in the eastern portion of
Bremerton.
Four small pressure zones have no storage and are served by booster pump stations. No
evaluation of these pressure zones was made.
System Analysis
8-33
2005 City of Bremerton Water System Plan
The West 580 Zone, to be completed in late 2006, is served by the City of Port Orchard's
reservoir and was not included as part of the system evaluation.
System Analysis
8-34
2005 City of Bremerton Water Systekll Plan
ummary 0 orage va ua Ion
Equalizing Storage (greater than 30 psi) Total Storage (greater than 20 psi)
Pressure Zone 2005 2011 2024 2005 2011 2024
All West Pressure Zones (West 256, -
West 440, and West 650) (Table 8-
5) 533,396 285,4 77 (270,586) 1,576,558 744,874 (1,970,931 )
West 440 (Table 8-6) 915,167 889,377 831,533 419,963 333,447 50,935
West 256 and West 440 (Table 8-7) 1,145,017 897,388 341,978 1,185,525 354,816 (2,357,806)
West 650 (Table 8-8) 1,039,076 1,038,785 1,038,134 717,946 716,971 713,788
East 490 (Table 8-9) 1,889,282 1,871,322 1,831,041 550,460 490,212 293,476
East 398 (Table 8-10) 1,132,044 1,059,418 896,526 1,475,386 1,231,753 436,187
All East Pressure Zones (East 240,
East 398, and East 490) (Table 8'
II) 5,891,635 5,769,054 5,494,116 4,027,734 8,956,830 8,681,892
West 517 (Table 8-12) 44,492 (78,178) (816,808) 179,058 ( 178,(12) (3,199,442)
Table 8-13
Bremerton Water System
S f St Elf
System Analysis 8-35
2005 City of Bremerton Water System Plan
8.4.7 Storage Recommendations
Based on the analysis above, new storage for the Bremerton system is needed to meet
long-term deficiencies. The sections below describe recommended improvements and
options to meet these storage requirements.
West 440 Zone
The West 440 by itself has adequate equalizing and total storage capacity through the 20-
year planning horizon.
West 256 Zone
The combined West 256 andW est 440 Zone analysis indicates that the two zones
currently have adequate storage with a total storage deficit of 2.37 MG by 2024.
Construction of a 2.5 MG reservoir will provide adequate storage for the full planning
period.
Additional storage must be constructed above elevation 241 to eliminate the deficit. This
new storage could be installed in either the West 440 or West 256 Zones to be available
to mitigate the deficiency. The Reservoir 5 site is a possible location for an additional
reservOIr.
A potential alternative to construction of new storage in the West 256 Zone is to reclaim
some of the dead storage in Reservoir 4 by converting the highest services in the pressure
zone to the West 440 Zone. This option will be evaluated by the City prior to pre-design
of any reservoir construction projects.
West 580 Zone
The West 580 Zone is currently under construction to be completed in late 2006. It will
be served by the new Pump Station 2a which will be operated from the level in the Port
orchard Fiegly Road reservoir. Storage needs will depend on the rate of residential
growth. Bremerton currently has plans to construct an additional 1 MG reservoir for this
zone in 2015.
Combined Western Zones
The combined western zones reflect the situation in the various individual zones. The
deficit of approximately 2.0 MG by 2024 can be solved by eliminating the storage
deficiency in the combined West256 and West 440 Zones.
East 240 Zone
This zone has no current or projected storage deficiencies.
System Analysis
8-36
2005 City of Bremerton Water System Plan
East 398 Zone
This zone has no current or projected storage deficiencies.
East 490 Zone
This zone has no current or projected storage deficiencies.
West 517 Zone
This zone has adequate equalizing and total storage for current conditions, and
experiences a deficit in equalizing storage by early 2007 and in total storage shortly
thereafter. Since this zone consists primarily of commercial and industrial development,
construction of new storage should be completed in stages as development occurs and
new storage is needed. Mitigation of the 6-year equalizing and total storage deficit
requires construction of a 1.0 MG reservoir with approximately 100,000 gallons above
elevation 486. Mitigation of the remaining projected deficit can be completed after 2011
or as development occurs.
8.5 Reference
Technical Appendix III Water Supply Plan. South Kitsap County Industrial Area Sub-area Plan.
SEMCON, Inc. December 1999.
West 580 Pressure Zone Project Approval Report. URS. 2004.
System Analysis
8-37
2005 Bremerton Water System Plan
Section 9
Capital Improvement Plan
9.1 The Capital Planning Process
A number of system improvements have been identified during the completion of this plan. The
development of the specific improvements has been described in the appropriate section. This
section combines the various improvements identified into a single listing which can be
prioritized and scheduled.
The City prepares a Capital Facility Plan (CFP) as required by the Washington State Growth
Management Act (GMA). This CFP is updated every two years and was last updated in 2004.
Kitsap County also prepares a CFP and it will be next updated in 2006. The Water Utility
updates its 20-year CIP every six years with the Water System Plan Update. The Utility updates
its six-year CIP annually at the beginning of the budget cycle in the second quarter of each year.
The GMA requires the improvements identified in the water system planning process be
consistent with GMA planning.
9.2 Identification of Recommended System Improvements
A listing of improvements to the Bremerton system has been created through the combination of
the following:
· Existing Bremerton Water Utility Capital Improvement Plan as approved by the City Council
for the years 2006 through 2011,
· Additional projects identified during the water hydraulic model analysis as performed as part
of this plan of Bremerton's source, storage, distribution, transmission, and water quality,
· Projects required to meet federal and state regulatory requirements, and
· Other projects identified by City personnel for the years beyond the approved CIP for the
years 2006 through 2011.
These projects have been combined into Table 9-1 showing project name, scheduled year of
activity, and estimated project cost. Cost for the pipe construction is based on $12.00 per inch
diameter per foot and include all project costs (construction, sales tax, engineering,
administration, etc.).
Each year, the Utility has allocated an annual amount for main replacement in the CIP which
funds both water main work as identified by the hydraulic analysis and substandard main
replacement. The list of anticipated distribution improvements is located in the appendices.
The Utility has outlined a plan to replace substandard mains, defined as generally being three
inches or less in diameter and need to be replaced for improved water service.
Additionally, the Utility allocates an annual amount for the following recurring capital
expenditures:
Capital Improvement Plan
9-1
2005 Bremerton Water System Plan
. Miscellaneous minor capital equipment and improvements for the Water Resources Division
. Miscellaneous minor capital equipment and improvements for the Utility Operations
Division
. Meter replacement
. New taps and meter installation
. Fire hydrant installation
There are several major projects projected for the Utility that are not part of the CIP but are
funded through operations and maintenance expense such as the water system plans required
every six years, other water planning and reports, and reservoir coatings.
CIP projects are categorized according to the reason required:
. Maintenance
. Replacement or upgrade (not growth-related)
. Required to meet state and federal regulations
. Growth-related upgrade
9.3 CIP Schedule
The City has already approved the existing CIP schedule for projects scheduled from 2006
through 2011. Water projects scheduled from 2012 through 2025 have been identified by City
personnel, were developed during hydraulic modeling, will be required by regulations, were
recommended by studies, or are required to serve growth. The schedule is based on their relative
priorities. Those with high priorities are scheduled to be built between 2006 and 2011. Those
with lower priorities are scheduled for later years.
Funding for the CIP program comes from rates, grants and loans, and revenue from timber
harvest on Utility-owned land.
On a regular basis the Water Utility conducts a Cost of Service study to determine the revenue
needs. An annual amount is allocated for CIP projects. Financial planning is more fully
discussed in Section 10.
Capital Improvement Plan
9-2
Table 9-1
City of Bremerton Water Utility Twenty Year 2006 - 2025 Capital Improvement Plan ($2006)
..
~
o
0::
2
4
5
7
8
9
R0241102
10
R6235102
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
400
Annual Substandard Water Replace inferior water mains that are
Main Replacement undersized and/or deteriorated
4000
Annual Distribution Main
Improvements
Annual Mise Capital
Improvements Water
Resources Division
Annual Mise Equipment"
Utility Operations Division.
401
402
410
Annual Taps/Meters
496
Annual Meter
Replacement
403
Annual Fire Hydrants
4367
Road Maintenance and
Abandonment Plan
Anderson Creek Wellfield
Improvements
West 580 Zone
Development
Ultraviolet Treatment
Facility
Install new and replacement mains as
identified to improve flow. pressure, water
ualitv and maintenance
Construct minor capital improvements
Continuous replacement of miscellaneous
equipment
Installation of taps and water meters as
requested by customers
Replace old meters on a periodic basis to
insure accurate reading and billings
Installation of fire hydrants as requested bv
customers
Washington State Forest Practices Act
requires a road maintenance program in
utilitv-owned forests
Well construction. redevelopment, and
Pump Station 2 upgrade improves water
flow into town from this source, and
improves flow to East Bremerton during
erieds of hinh water demand
Last phase of construction of a pump
station and transmission main to serve na....
urban development in the W580 zone in the
Anderson Creek Area (most of project had
outside funding)
Federal Enhanced Surface Water
Treatment Rule will require Bremerton to
install dual disinfection - UV will be used i
addition to chlorine
416
Pump Station 4 Upgrade Upgrade Pump Station 4 and install 12"
and Transmission Main transmission main to improve flow to the
West 440 Zone
Water Meters - Extra
Large Replacements
3
Water System Security
Imnrovements
4307
471
4354
4
5
Watershed Land
Purchases
419
4303
Reservoir 15,18,17,19,
20, 5 Seismic Isolation
Valves
7
Well 22 Pump and
Controls
Pressure Re9ulating
Valves
8
Warren and Manette
Isolation Valves
McKenna Falls Weir
Modification
10
nstal aton 0 the new meters IS necessary
for accurate billing of water and sewer
service as existing meters are outdated,
accuracy is questionable, and spare parts
. , "n.v.il.hl.
Construct security improvements identified
in the Vulnerabilitv Assessment
Replace failing old timber abutment at
entrance to watershed to ensure safe entry
into source facilities
Install new chlorinators, containment, and
shut-off valves
Recurring
$2,100,00 until
complete
$500,00
per yea
4
$200,000
Recurring
$500,000
4
$125,000 Recunring
per yea
4
$15,000
4
$100,000
$15,000 Recurring
per yea
$70,000 Recurring
per yea
6
$65,000
$100,000 . $100,000
$20,000
$150,000 Recurring
per yea
2
$200,00(
$20,000 Recunring
per yea
5
$1,200,00C
$40,00C
$5,000,00C
$l,OOO,OOC
$300,00C
$100,00C
$50,00C
$50,00
$400,00
$300,00
$300,00C
$150,00C
$120,00C
$100,00C
$100,00C
$75,00C
$75,00C
6
$20,000
Recurring
through
2015
$20,000
2004
$400,000
4
2005
6
$40,000
2006
5
$60,000
2006
$400,000
4
2006
$150,000
4
2006
$50,000
4
2006
$50,000
2
2006
4
$50,000
2007
4
2007
4
2007
4
2007
4
2007
4
2007
4
2007
4
2007
4
2007
4
$200,000
$500,000
$100,000
$15,000
$65,000
$20,000
$300,000
$150,000
$50,000
$400,000
$300,000
$300,000
$150,000
$120.000
$50,000
$100,000
$75,000
$75,000
$200,000
$300,000
$500,000 $1,000,000
$100,000
$100,000
$15,000
$65,000
$100,000
$20,000
$20,000
$700,000
$50,000
$15,000
$65,000
$100,000
$20,000
$20,000
$300,000
$500,000
. ....
','
$100,000
$15,000
$65,000
$100,000
$20,000
20,000
$325,000
$325,000
$500,000 $1,000,000
$125,000
$125,000
$15,000
$70,000
$150,000
$20,000
20,000
$2,000,000 $2,000,000
Page lof2
$15,000
$70,000
$150,000
$20,000
20,000
$250,000
$500,000
$125,000
$15,000
$70,000
$150,000
$20,000
20,000
$500,000
$125,000
$15,000
$70,000
$150,000
$20,000
20,000
$500,000
$125,000
$15,000
$70,000
$150,000
$20,000
20,000
$500,000
$125,000
$15,000
$70,000
$150,000
$20,000
$500,000
$125,000
$15,000
$70,000
$150,000
$20,000
$500,000
$125,000
$15,000
$70,000
$150,000
$20,000
'.
$500,000
$125,000
$15,000
$70,000
$150,000
$20,000
. 'i.'." ',.,,' 0'.
, "
..
""': ,.:'
ai :1.~~~:
,";. .....;.;?
....;; .......:..;.
$500,000
$125,000
$15,000
$70,000
$150,000
$20,000
$500,000
$125,000
$150,000
." ""':""1"
i':i .{~i
>......... .. .";",,.,:,',:'
'ri'S",?,'"
',':'C: c' " _,';
:cj - .
"0 ';. ..:.;:
.
$500,000
$125,000
$15,000
$15,000
McKenna Falls Road
Repair
Anderson Creek
Chlorination Unarades
Reservoir 12 Roof
Replacement and Seismic Replace roof on Reservoir 12
Upgrade
Booster Station 3
Abandonment and Zone
Imnrovements
Extend reduced W440 Zone to improve flow
and pressure
Purchase 9 acres on the City's side of
McKenna entrance gate and 2 acres on th
East side of the watershed to increase
seGuritv.
Install isolation valves on the stated
reservoirs to prevent draining of the
reservoirs in case of earthquake or other
emeraencv
Install pump and controls at Well 22 once
water riahts have been finalized
Install pressure relief valves at critical areas
in the distribution svstem.
Install isolation valves adjacent to the
Manette and Warren Avenue bridges to
revent oice failure on the bridne
Sawcut and remove concrete over TM to
eliminate ponding downstream of the
existing weir for the system intake
Purchase a trailer mounted generator to
Trailer Mounted Generato provide electrical power to west-side pump
stations durina Dower outaaes
$70,000
$70,000
$150,000
$20,000
$20,000
$500,000
$125,000
$150,000
'. .
$500,000
$500,000
$125,000
$125,000
$15,000
$15,000
$15,000
$70,000
$70,000
$70,000
$150,000
$150,000
$20,000
$20,000
$20,000
2006 - 2025 CI P
..
~
o
a:
;,? 'c" ";<',, ; "
,,;', ;. .. .'
;.ii/ ,>, .. ", ';,'},
t, ,/'
,<''".'" it \, , ' ~o,~~~I~l~1
" ;'"d" , ;29~3 ','
,'; ','; i,
{{'f,,: :; ,
:";~ ,X
.:if i;C.i, , ,;"t
;, ,
Pump Station 17 Install improved MCC and control valve at "
11 MCC/Gorst Control Valve Pump Station 17 $50,00 2007 4 $50,000
, ,
12 Heinz Creek Bridge (2000 Replacement of existing partially blocked $50,OO( 2007 4 $50,000 "
Rd Culvert' culvert ,
13 Reservoir 8 Drain Improve drain from Reservoir 8 to prevent $30,OO( 2007 4 $30,000 ,
rone"" damane
13th Street, High Stree~
14 and Ohio Street 12" Construct 12- distribution main in this $880,00( 2008 4 $30,000 $850,000
Distribution Main neighborhood to increase flow and pressur
Upgrade Disinfection .. Replace gas containers with alternative
15 System for Union River $550,OO( 2008 4 $50,000 $500,000
SUMI disinfectant as a result of UV installation
, Change supply for Gold Mountain Golf
Gold Mountain Golf Course to serve the irrigation system from
16 Course Irrigation i the transmissioF:1lT1ain to reduce summer $400,00( 2008 6 $50,000 $350,000
'. demands on adjacent wells and the West
517 Zone
Install pump, motor, 700 1.1, piping, power
17 Well 1 R Upgrades and telemetry into new well to bring the we $200,OO( 2008 4 $200,000
on-line
18 Forestry Offices Upgrade Replace obsolete mobile-home office facili $150,OO( 2008 4 $150,000
Manette Bridge Water Provide 12" pipe only for a new water main $75,OO(
19 Main on the Manette Bridge which is scheduled 2008 4 $75,000
to be replaced in 2007 and 2008
R0245101 Casad Dam Early Waming Install an early warning system at Casad $60,OO( 2008 4 $60,000
Svstem Dam in case of emeraencv
Construct a new transmission main under
20 C Street from Oyster Bay SR3 to provide redundant conveyance of $2,000,00( 2009 4 $250,000 $1,750,000
to National Ave - 24" pipe water from the source to the West 256
Zone
Oyster Bay Remodel & Construction of additional office facilities to
21 Expansion ; consolidate PW&U Staff at oyster Bay $375,OO( 2009 4 $375,000
Location
Hardening of Casad Dam A geotechnical study recommended $200,OO(
23 Overflow hardening of the rock face below the 2009 4 $200,000
overflow to nrevent erosion
Well pump. motor, and electrical service
24 Well 18 Pump and Motor needs to be upgraded to increase well $75,00 2009 6 $75,000
canac;ru i
Twin Lakes Diversion
25 Improvements Construct diversion facility $75,00 2010 4 $75,000
26 Emergency Source Upgrade facilities for emergency water $400,00 2011 5 $40,000 :' $360,000 ,
Upgrades supply at Gorst Creek and Andersen Cree
Construct reservoirs in the pressure zones
27 Storage Improvements to provide additional storage for high $2,500,00 2012 6 $2,500,000 $420,000
demand n<>rlods and fire nrotection
West Branch Diversion Increase the pipe size at the West Branch
28 Expansion diversion to maximize water use from this $150,00 2012 4 $150,000
source
29 Unnrade SCADA Uoorade RTUs to PLC svstem $200 00 2013 4 $200,000
Union River Main Stem Will facilitate draining of intake basins for
30 Isolation Sluice Gate and $75,OO( 2013 4 $75,000
Diversion to E Branch maintenance
RedrHl a larger well once Ecology makes a
31 Redrill Well 9 decision on the new water rights application $550,OO( 2014 4 $500,000
for 1000 nnm
32 West 517 Zone storaoe Construct storane for SKIA Growth $2 000 00 2015 6 $2,000,000
33 West 580 Zone Reservoir Construct 1 MG Reservoir and transmission $1,300,00 2015 4 $1,300,000
main on Fiegley Road location
Port of Bremerton Upgrade transmission main from 8"AC to
34 Transmission Main 18" 01 to proVide more capacity for future $1,000,00 2015 6 $1,000,000
increased demands
35 Property Purchase for To be prepared in the event a new $150,OO( 2016 5 $150,000
Potential Filtration Plant treatment facilitv is renuired
36 Replace McKenna Falls Replace traveling screens $100.00 2016 4 $100,000
Travelinn Screens
37 36" Transmission main Replace undersized and obsolete $6,000,00 2018 4 $2,000,000 $2,000,000 $2,000,000
McKenna Falls to Gorst transmission main
TOTAL COST BY YEAR $2,220,000 $3,220,000 $2,635,000 $4,020,000 $4,395,000 $3,765,000 $4,735,000 $1,425,000 $1,400,000 $5,200,000 $1,130,000 $880,000 $2,880,000 $2,880,000 $2,880,000
$880,000 $880,000 $1,300,000 $880,000 $880,000
26
27
28
29
30
31
32
33
34
35
36
37
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
Page 20f2
2006.2025 CIP
2005 City of Bremerton Water System Plan
Section 10
Financial Plan
10.1 Introduction
The effective implementation of a Water System Plan (WSP) is dependent on accurately
developing a plan that can be financially supported by the utility, will meet State and local
regulatory requirements, and provides the flexibility to deal with unforeseen changes.
This chapter presents a financial plan that reviews the revenues and expenses for the City of
Bremerton's (City) water system. The financial plan includes projected operating and capital
costs of the system for the six-year time horizon of 2006 to 2011. The revenues and expenses
used in the financial plan were obtained from the City's 2005 budget in conjunction with
historical consumption information. The capital costs contained within the financial plan utilize
the Capital Improvement Plan (Crp), which was developed for the City's water utility rate study,
recently updated in 2005. The results of the financial plan outline the annual operating and
capital needs of the water system and determine if current water revenues are sufficient to cover
costs. This analysis is not intended to be sufficient to provide a detailed review of cost of service
or various alternative rate designs; however, the City recently completed a rate study in 2005
independent of this planning document to address those issues. In addition, Bremerton's
conservation-oriented rates are being reviewed as part of this project.
10.1.1 Past Financial History
The past six years of financial information for the water utility were evaluated to gain an
understanding of the past performance of the utility, and at the same time, gain
perspective on the current financial status of the water utility. Table 10-1 is a summary of
a six-year financial history (2000 to 2005) for the City's water utility.
The utility has an adequate financial position. As Table 10-1 illustrates, the utility is
showing a positive cash flow for the historical test period. The balances are used for
capital improvements and reserved for future capital needs.
While some capital improvements are funded through low-interest loans and revenue
bonds, resulting in debt service payments, historically the utility has also funded a
substantial portion of its capital improvements through rates. Target levels for funding
capital improvements for future years are discussed later in this section.
Financial Plan
10-1
2005 City of Bremerton Water System Plan
Table 10-1
Water System Financial History
2005 2004 2003 2002 2001 2000
Revenue
Operating Revenue $6,740 $5,739 $5,093 $4,420 $4,144 $4,054
Other Operating Revenue 1,552 1,649 1,476 1,631 1,104 1,454
Interest and investment 90 59 108 137 262 414
Other Non-operating Revenue 4 310 256 190 200 212
Transfers In 0 0 103 0 0 (24
Total Revenue $10,475 $7,757 $7,036 $6,378 $5,711 $6,11 0
Expenses
General Operations $1,373 $],336 $1,180 $989 $923 $975
Maintenance 2,154 ],995 1,691 1,504 1,388 1,528
Customer ServiceIMarketing 282 268 298 266 364 464
General Adminstration 1,053 977 689 623 535 487
Other Operating Expenses 588 673 590 571 519 622
TotalO&M $5,451 $5,250 $4,448 $3,953 $3,728 $4,076
Taxes and Transfers
Property, Excise, and B&O $309 $279 $229 $547 $496 $509
Total Taxes and Transfers $309 $279 $229 $547 $496 $509
Other Expenses
Depreciation and Amortization $1,328 $1,557 $1,499 $1,314 $1,222 $1,240
Interest Expense 154 139 68 66 67 70
Total Other Expenses $1,482 $1,696 $1,567 $1,380 $1,290 $1,310
Total Revenue Requirements $7,241 $7,224 $6,244 $5,880 $5,514 $5,895
Balanceillefinciency of Revenue $3,233 $533 $792 $499 $197 $215
Note: All values are shown in $1,000.
10.1.2 Development of the Financial Plan
A six-year financial plan was developed to determine the City's ability to meet its capital
improvement and operating needs over the six-year review period. In developing the
financial plan, fund balance and reserve levels were also analyzed. The financial plan was
developed to review the projected revenues and expenses of the water system between
2006 and 2011. The City's 2005 budget was used as a base. Future years were escalated
by applying factors for inflation and growth, as described below.
10.1.3 Revenue
The first component of the financial plan is a review of the sources of revenue of the
water system. The different revenues received from operations are:
. Revenues from services - rates, connection fees, timber sales, service repairs, fines
and penalties, ancillary fees;
. Miscellaneous revenue - interest earnings on fund balance, lease payments;
. Other income - General Facility Charges, grants;
Financial Plan
10-2
2005 City of Bremerton Water System Plan
. Non-revenue receipts -loan proceeds; and
. Other financing sources - sale of assets.
Projections for future year rate revenues were developed by applying a projected growth
rate of one percent to the 2005 budgeted rate revenue. Other miscellaneous revenues,
including investment interest, penalties and other revenue, are projected to increase
approximately one percent per year through 2011,.
Rate revenues are projected to be $7.3 million in 2006. The rate revenues of the City
come from retail sales to the residential and commercial customers and Puget Sound
Naval Shipyard (PSNS) sales. With growth applied at one percent per year, the rate
revenue is estimated to increase to $7.7 million by 2011.
Other revenues for 2006 total approximately $460,000, with a majority of the revenue
stemming from long-term facilities leases (such as cell towers) and water connection
charges. The total amount of other revenue increases over the six years, reaching
approximately $485,000 by 2011. The total revenue available to offset the operating and
capital requirements of the water system totals $7.8 million in 2006, and is projected to
increase to $8.2 million by 2011.
10.1.4 Expenses
The projection of future operating expenses, or the application of funds, is based on the
2005 budget. These expenses are projected for future years by applying the escalation
factors pertinent to the type of expense being reviewed. The second part of the financial
plan is a review of the applications of funds. In developing the financial forecast, four
main cost components were reviewed:
. Operations and Maintenance (O&M) Expenses
. Taxes and Transfer Payments
. Debt Service
. Capital Improvements Funded from Rates
Operation and Maintenance Expenses
Using the 2005 budget as a starting point, expenses were escalated by factors representing
assumed inflationary rates to obtain projected costs. Escalation factors range from
employee benefits (combined with other increasing labor costs) at an estimated annual
increase of7.6 percenUo miscellaneous equipment, materials, and supplies at one percent
each. Purchased power was calculated at anescalation of three percent per year. Detailed
escalation factors are provided at the end of this section.
While operating costs increase in some areas for regulatory compliance with IDSE and
other monitoring requirements (including approximately $5,000 per year for
cryptosporidium in 2007 and 2008) in future years, as noted in Section 4, the Water
Resources' professional services budget remains at average annual expenditure levels of
Financial Plan
10-3
2005 City of Bremerton Water System Plan
$100,000 per year (reducing the 2006 budget level by $165,000). The inflationary
escalation factors still show an overall increase in the operation and maintenance budget
for future years. IDSE future compliance costs are shown in 2011 at $8,000 per year.
Additional operation and maintenance costs for the ultraviolet (UV) water treatment plant
were identified in a treatment option evaluation and are projected to begin in 2011,
adding $63,000 to operations and maintenance expenses.
No other program cost increases above budget year 2006 figures were assumed as part of
the projected costs. Operation and maintenance expenses ranged from $6.85 million in
2006 to a projected $8.37 million in 2011.
Taxes and Transfer Payments
The water system currently has tax obligations to the State in the form of excise taxes.
The state public utility tax is calculated as 5.029 percent of the water utility rate revenues.
For 2006 these taxes/transfer payments total approximately $1 million through 2011.
Projected taxes for the period assume constant tax rates over time.
Debt Service
According to City financial records, two Public Works Trust Fund (PWTF) and nine
Drinking Water State Revolving Fund (DWSRF) loans relate to the water utility. An
annual payment of approximately $180,000 for a 1998 PWTF loan for the 36" water main
is completed in 2019. The annual payment of approximately $12,000 per year for the
1999 PWTF loan to the Tracyton Water District is estimated for the planning period.
The City's nine DWSRF loans are for various projects. The larger loan amounts are for
the following projects: East-West Flow Improvements, the Casad Dam Seismic Retrofit,
Casad Dam HB Valve, Pump Station 4 Upgrade, and the Tracyton Water District
Upgrade. Additional, smaller seismic and retrofit type projects also exist. The DWSRF
loans total about $510,000 per year in debt service payments. The final amount is an
annual Utility Local Improvement District (UUD) payment of $61,500 per year. This
amount is offset by a similar funding revenue level (UUD revenues).
The combined debt service on the existing debt averages approximately $770,000
between 2006 and 2011. The model used to develop the financial plan indicates that the
City plans to apply for additional loans through 2011 to meet the capital needs identified
within this plan. These projected loans add an additional $540,000 of debt payments by
2011, for a total projected debt service of $1.3 million by 2011.
Meeting debt service coverage (DSC)requirements is an important financial indicator for
well-managed utilities. Debt service coverage is a financial measurement of an entity's
ability to repay debt. A DSC ratio is a comparison of net income before debt service
payments to the total debt service on revenue bonds or of all outstanding debt service. A
DSC ratio of 1.25 or 1.30 is generally considered the legally acceptable minimum for
revenue bonds. However, the City has established written financial policies that target a
debt service coverage ratio of 1.50 or above. The City meets this requirement every year
Financial Plan
10-4
2005 City of Bremerton Water System Plan
except in 2011, when additional operating costs for UV treatment are scheduled to begin.
The City will need to be watchful of this planning requirement during its financial
evaluations.
While no revenue bonds require the 1.5 DSC ratio test at the current time, it is an
important financial indicator to rating agencies if the City decides to pursue revenue bond
funding any time in the future. The City does have outstanding revenue bonds for its
wastewater utility for which the DSC coverage ratio is calculated and met on a combined
utility basis.
Capital Improvement Projects from Rates
Capital improvement projects (CIP) are related to the infrastructure of a utility. CIPs are
generally divided into two categories: capital improvements related to renewal and
replacements of the existing plant (depreciated facilities), and growth-related projects,
including system expansion and upgrades to accommodate new customers.
The City capitalizes some staff time and benefits for those staff working on capital
projects. In addition, planning and construction projects are included within the capital
component of the financial plan. The financial analysis conducted for this plan has
incorporated the capital projects outlined in the 2005 rate study and modified by Section
9 of this plan. These projects have been allocated by year in order to quantify the annual
capital requirements for the planning period. Identified CIP totals range from
approximately $1.9 to $4.6 million per year from 2006 to 2011.
It is not anticipated that the City will use a large amount of reserve funding to cover its
capital improvements. Reserve funds are discussed later in this section.
As prudent practice, a utility should fund a portion of its capital improvements from rates
on an on-going basis. The City is not expected to have any remaining capital fund
balance in 2006; however, an increase in rate-funded capital (from approximately
$300,000 in 2006 to $765,000 in 2011) and continued steady timber sales funding
(averaging around $1.1 million a year) should not only cover capital improvements, but
build a positive balance in the ending capital reserves, reaching $720,000 in 2011.
The capital analysis assumes that any additional funding beyond what is necessary to
meet the annual capital requirements will be placed into the working capital reserve for
future capital needs.
10.1.5 External Sources of Funds for Capital Projects
The City has the ability to apply for grant arid loan funds available to public entities for
water system projects and has been successful at obtaining a number of low-interest
loans, as described earlier under the debt service section. Table 10-2 provides a summary
of information for various funding agencies. These sources rarely provide full funding of
a construction project. The City needs to supplement any of these funds with matching
Financial Plan
10-5
2005 City of Bremerton Water System Plan
funds to meet eligibility criteria and to ensure implementation of the recommended
capital improvement projects can occur.
Table 10-2
Funding Agency Contacts
Program Address Phone Fax Internet
Centennial Clean Department of Ecology
Water Fund P.O. Box 47600 (360) 407-6566 (360) 407-6426 www.ecy.wa.gov
Olympia, WA 98504-7600
Drinking Water Department of Health
DWSRF
State Revolving PO Box 47822 (360) 236-3095 (360) 236-2253 www.doh.wa.gov
Fund Olympia, W A 98504-7822
Public Works Public Works Board
Trust Fund P.O. Box 48319 (360) 586-7186 (360) 664-3029 www.pwb.wa.gov
Olympia, W A 98504-8319
Infrastructure
Database (over Infrastructure Assistance (360) 725-5002 www.infrafunding.wa. gov
200 funding Coordinating Council (lACe)
programs)
A brief description of these funding sources is provided below.
DeparlmentofEcorogy
The Centennial Clean Water Fund (CCWF) is available to local governments and tribes
for measures to prevent and control water pollution. Both grants and loans are available
on a yearly funding cycle.
CCWF is the largest State grant program for water projects. It provides funding for
planning, design, and construction of facilities and other activities related to water
quality. The primary focus of the program is pollution prevention and funding projects
with a quantifiable water quality benefit. Funds are available to protect a source of water
supply, and implement wellhead protection, water conservation, and water reuse projects
if they can be shown to be the cost-effective alternative to solving a water quality
problem. Funding from this program is not available to provide excess capacity or a
source of supply, but must be used to meet existing customer needs.
Interest rates are 0.5 percent for loans up to five years, while loans over five years but less
than 20 years have a 1.5 percent rate. Grant funding of 50 to 75 percent ofa project can
be available, depending on the type of project.
Another source of Washington Department of Ecology (Ecology) grant funding provided
by the Remedial Action Grant Program is normally used only to mitigate contamination
events.
Financial Plan
10-6
2005 City of Bremerton Water System Plan
Washington Department of Health
The SDW A appropriates funding for states to develop their DWSRF loan programs.
Each state receives annual allocations in the form of a capitalization grant. In Washington
State, the DWSRF is jointly managed by DOH Division of Drinking Water and the Public
Works Trust Fund Board (Board), along with its partner, the Department of Community,
Trade and Economic Development.
DWSRF loans are available to all community public water systems and non-profit, non-
community public water systems, except federally-owned and State-owned systems. The
loans may be used to address SDW A health standard violations, replace infrastructure for
SDW A compliance, or consolidate supplies and acquire property if needed for SDW A
compliance.
The interest rates on DWSRF loans are 1.5 percent for the basic rate or one percent for an
"economically distressed county," as determined by the DWSRF guidelines. They apply
a one percent loan fee on all loans. The interest rate can be dependent on the overall
economic situation of the area. If 51 percent of the area's households are below 80
percent oftheniedian income for the county, the interest rate drops to 0.5 percent, ahd if
the 51 percent are at or below 50 percent of the county median income, the loan has a
zero percent interest rate. In this case the loan has a 30-year (or life of the project) period,
while all others have a 20-year (or life of the project) period.
Public Works Trust Fund
The PWTF loan program is set up by the Washington State Legislature to assist cities,
towns, counties, or special districts with funding for different types of public works
projects. The projects can include streets, roads, drainage systems, water systems, and
sanitary sewer systems. The emphasis of allocating funds is for replacement and repair of
existing systems. Funds are not allocated to install new water systems but are granted to
rehabilitate or replace existing systems serving an existing population.
The loans are issued atup totwo percent interest rate for a maximum term of 20 years or
the life of the project for applications requesting 95 percent project funding. The interest
rate decreases to 0.5 percent when applicants provide at least 15 percent of the project
funding. Debt service coverage is not imposed on the PWTF loan.
Infrastructure Assistance Coordinating Council
Numerous other programs with funding are available for various other aspects of water
utility capital projects. The Infrastructure Assistance Coordinating Council (Council)
provides resources and conferences on the available funding sources. The Council is
comprised of State and local organizations whose function is to provide funding for
infrastructure repair and development. The purpose of the Council is to assist local
governments in coordinating funding efforts for infrastructure improvements. This is an
important resource, as the Council will be aware of any new funding opportunities that
may anse.
Financial Plan
10-7
2005 City of Bremerton Water System Plan
While the above list of possible grant and loan opportumtIes for the City is not
exhaustive, it does highlight the most probable outside funding sources, excluding
revenue bonds and other external sources of funds, available to the City for its water
capital improvement needs. These other external sources of funds are described below.
Revenue Bonds
Revenue bonds are supported by the income generated from monthly utility charges. The
City Council can issue revenue bonds at its discretion. Water rates must be high enough
to pay system operation and maintenance costs plus the annual principal and interest cost
(debt service) of the bond issue.
F or investors to buy revenue bonds, rates must include adequate revenue to provide for
"coverage." The normal coverage is 20 to 30 percent of the debt service, depending on
the financial strength of the City.
Utility Local Improvement Districts
Projects benefiting a specific area of adjacent properties can be funded through utility
local improvement districts (UUD). After a UUD is formed, the cost of the project can
be assessed against the benefited properties in proportion to its share of the total benefits.
The amount of the assessment cannot exceed the increase in the value of the property
resulting from the project.
A UUD combines property assessments and revenue funding from water rates. The
additional security of the bonds tends to bring lower interest rates. Flexibility and equity
are also gained, as the City can accommodate the cost of special construction problems or
upsizing the distribution system.
Developer Extensions
Under a developer water main extension, the owner of a development requests water
service. Filing fees usually cover administration costs only. The developer pays all costs
of the extension and turns the facilities over to the City for operation and maintenance.
10.1.6 Internal Sources of Funding for Capital Projects
Internal funding sources available to offset capital costs include contributions received
from new water customers for their capacity impact on the system. The City updated its
water general facility charges (system development charges) in 2004. The 2006 charge
for a 5/8" x 3/4" meter connection is $2,369. . The charges increase by meter size, as the
capacity of the meter increases. These charges are adjusted annually to keep up with the
Construction Cost Index. The City should also conduct a comprehensive update of these
fees every 3 to 5 years, or as new major capacity-related projects are undertaken.
As noted earlier, the City also uses available reserves for capital projects, as available.
Financial Plan
10-8
2005 City of Bremerton Water System Plan
10.1.7 Summary of the FiJlancial Projections
A summary of the financial plan and resulting financial status of the water system is
provided in Table 10-3. This is an abbreviated summary of the detailed financial plan
and analysis, which is provided at the end of this section.
Table 10-3
Summary of the City's Projected Six-Year Financial Plan
2006 2007 2008 2009 2010 2011
SOURCES OF FUNDS
Water Sales $6,068,728 $6,129,415 $6,190,709 $6,252,617 $6,315,143 $6,378,294
Navy (PSNS) Sales 1,305,740 1,305,740 1,305,740 1,305,740 1,305,740 1,305,740
Timber Sales 0 0 0 0 0 0
Other Revenue 464 500 468 230 471 997 475 802 479 645 483 527
Total Sources of Funds $7,838,968 $7,903,385 $7,968,447 $8,034,159 $8,100,528 $8,167,561
APPLICATIONS OF FUNDS
O&M Expenses Plus Taxes $6,858,188 $6,963,839 $7,262,443 $7,563,102 $7,866,823 $8,373,871
Capital Outlays from Rates 300,000 700,000 700,000 721,000 743,000 765,000
Debt Service 765 183 816970 900417 1 057 985 1 163715 1 383 566
TOTAL NET REVENUE REQUIREMENT $7,923,371 $8,480,809 $8,862,860 $9,342,088 $9,773,538 $10,522,437
BALANCE/DEFICIENCY OF FUNDS ($84,403) ($577,423) ($894,413) ($1,307,929) ($1,673,010) ($2,354,876)
Plus: Add'l Taxes w/Rate Increase $0 ($90,342) ($139,937) ($204,635) ($261,754) ($368,437)
TOTAL BALANCE OF FUNDS ($84,403) ($667,765) ($1,034,350) ($1,512,564) ($1,934,764) ($2,723,314)
RATE ADJUSTMENT REQUIRED 1.1% 9.0% 13.8% 20.0% 25.4% 35.4%
PROPOSED RATE ADJUSTMENT 0.0% 10.0% 4.5% 5.0% 5.5% 5.5%
ADDITIONAL REVENUE WITH RATE ADJUSTMEN $0 $743,516 $1,120,719 $1,564,391 $2,083,234 $2,638,646
BALANCE/DEFICIENCY OF FUNDS ($84,403) $75,750 $86,369 $51,827 $148,470 ($84,667)
ADDITIONAL RATE ADJUSTMENT REQUIRE[ 1.1% -0.9% -1.0% -0.6% -1.5% 0.8%
Debt Service Coverage Ratio - Water Utility - All Debt
Before Rate Increase 4.20 3.63 2.92 2.16 1.77 1.17
When interpreting the results of Table 10-3, it is important to understand that the "Rate
Adjustment Required" is cumulative. That is, any rate adjustments made in previous
years would reduce what is required in the following years. If no adjustments were made
prior to 2008, a 13.8 percent adjustment would be required. The model assumes expenses
are completely expended within each year. Typically, utilities receive additional revenue,
and actual expenditures do not always total 100 percent of budget appropriations.
Therefore, the City has a number of options for deferring rate adjustments until the latter
part of the planning period. Those options would include adjusting capital improvement
timing, using more reserves for capital improvements, reducing some other operating
expenses, and closely monitoring additional revenue or increased growth beyond the one
percent assumed.
The results of Table 10-3 show that existing rates are insufficient throughout the planning
period under review. A "proposed" level of adjustment needed to transition the rates
over time is provided in Section 10.1.10.
Financial Plan
10-9
2005 City of Bremerton Water System Plan
The financial plan presented in this section is predicated upon an assumed level of growth
on the system (1.0 percent per year) and assumptions related to inflation. Should this
growth increase, slow down, or not occur, the level of rate adjustment required will be
affected. If costs escalate faster or slower than indicated in this plan, the projected rate
adjustments shown in Table 10-3 would also be affected.
10.1.8 Reserve levels
A key indicator of a utility's financial health and viability is its reserve levels. Because a
majority of the utility's revenue is consumption-based, and therefore dependent upon
weather conditions and usage patterns, maintaining adequate reserve levels is important
for stable fiscal management. A discussion of the utility's reserves is provided below.
Industry standards (American Water Works Association - AWWA) recommend that
utilities maintain working capital reserves at a level adequate to handle unexpected
occurrences, including unexpected cash flow fluctuations. A balance for an operations
and maintenance reserve, or operating reserve, is recommended to be a minimum of 45
days (12%) of operations and tax expense. For the City, that minimum balance would
equate to approximately $1 million inthe first half of the planning period, increasing to
$1.2 million by 2011. The Cityhegins theplanningperiod in 2005 with a balanceof$2.l
million in working capital. The balance increases throughout the time period due to
capital needs being lower than available funding. The 2011 ending balance is
approximately $3.4 million. Maintaining this balance will provide the city with
flexibility in meeting future capital requirements.
The City currently has a balance in the capital reserve fund. In 2005, this reserve is
unfunded, but grows over the review period to $720,000 by 2011. Sound financial
policies indicate that a capital. fund balance equal to an average year's worth of capital
projects is a prudent reserve amount. For the City, this minimum capital fund target
would be $3.4 million. Within the City's policies established in the 2004 rate study, a
minimum target of six months of construction expenditures is to be in reserve. That
would be approximately $1.7 million. Another measure used for a minimum target
balance of capital reserve can be 1.5 percent of original plant value. For the water utility,
that value is $1.4 million. The City will continue to watch this reserve level in future
years and build to the minimum target level whenever. revenue exceeds the capital
expenditures of a given year. Between the capital fund balance and the working capital
reserve, the City's reserve levels are more than adequate to meet this target.
The reserve review indicated that the City has adequate reserve funding to meet
unanticipated obligations and genetaloperating fluctuations. The City has improved the
financial stability of the Utility by clarifying financial planning goals and policies that
define the appropriate reserves and other financial guidelines as part of the 2004 rate
study.
Financial Plan
10- 10
2005 City of Bremerton Water System Plan
10.1.9 Review of the Existing Water Rates
Various "generally accepted" water rate structures can be used to establish or develop
rates. The initial starting point in considering a rate structure is the relationship between
fixed costs and variable costs. Fixed costs are generally collected as a fixed charge on a
monthly basis (e.g., $5.00 per month/meter). This charge may be called by various names
(e.g., customer charge, meter charge, base charge, etc.) but in all cases, it is intended to
collect those fixed costs the utility incurs.
Currently, the City has both a meter charge for service and a commodity charge based on
usage. For a residential customer, the meter charge is a minimum charge. Different rate
schedules apply to customers in different parts of the service area - inside the City, the
County (including the Port of Bremerton and Rocky Point), Tracyton, and Jackson
ParklPSNS. For purposes of this overview, the rates in effect as of January 2006 are
presented in Table lO-4.
Table 10-4
Overview ofthe City's 2006 Monthly Retail Water Rates
Metered Rate/Month City Navy) Tracy ton 2 County Rocky Point 3
5/8 x 3/4" $9.22 $9.22 $9.22 $13.83 $13.83
1" 10.55 10.55 10.55 15.83 15.83
1-1/2" 14.98 14.98 14.98 22.47 22.47
2" 20.13 20.13 20.13 30.20 30.20
3" 38.20 38.20 38.20 57.30 57.30
4" 71.09 71.09 71.09 106.64 106.64
6" 252.30 252.30 252.30 378.45 378.45
8" 920.79 920.79 920.79 1,381.19 1,381.19
10" 3,287.53 3,287.53 3,287.53 4,931.30 4,931.30
12" 12,362.91 12,362.91 12,362.91 18,542.87 18,542.87
Commodity Charge
0-10 CCF/Month $1.00 No residential $1.00 $1.50 $1.50
> 10 $1.12 accounts $1.12 $1.68 $1.68
CCF/Month
.
Non-residential
Commodity Charge $1.08 $1.08 $1.08 $1.62 $1.62
L PSNS pays a water rate as determined by contract - currently under review.
2. Tracyton Water District was assumed by the City in 2004. Former customers pay a surcharge of $7 .44/month for debt service.
~. Rocky Point WaterDistrict customers. pay a$2.50/month surcliargefor Pistrict administration and other expenses.
Separate rate schedules apply to low-income senior customer and fire protection customer
rate schedules that differ slightly from the rate schedules above. Customers outside City
limits pay a 50 percent differential.
A majority of the Utility's revenue (58 percent) comes from the retail customers within
the City. An additional 37 percent comes from the retail sales to remaining retail
Financial Plan
10-11
2005 City of Bremerton Water System Plan
customers (including County customers and the Navy) and the remaining 5 percent from
wholesale and fire-lines. The monthly bill for a City retail customer using 1,000 cubic
feet of water (10 CCF) would be $19.22. A monthly bill for an average County customer
using the same amount would be $28.83.
The City's meter charge is based on the size of the customer's meter. This approach is
used often to recognize that different meter sizes place different demands and capacity
requirements on the system. It is common to base the meter charge rate differential on
the A WW A safe operating capacity of the meter. The meter capacity approach is
summarized in Table 10-5.
Table 10-5
Example of the Development of Fixed Meter Charges Based Upon Meter Capacity
Safe Maximum Oper. Meter Capacity Meter Charges at
Meter Size Capacity GPM I Weight Factors Capacity Weightings
5/8x3/4" 20 1.00 $4.05/month
I" 50 2.50 1O.l3
I ~1/2" 100 5.00 20.25
2" 160 8.00 32.40
3" 300 15.00 60.75
4" 500 25.00 101.25
6" 1,000 50.00 202.50
8" 1,600 80.00 324.00
10" 2,300 115.00 465.75
12" 3,375 168.75 683.44
I. A WW A C-700-77 Cold Water Meters - Displacement Type for 5/8x3/4" meter.
Table 1 0-5 shows the fixed meter, or base charge, increases in relationship to the A WW A
safe operating capacity of the various meter sizes. Meter capacity is an important concept
in that a customer that has a 2" meter is regarded, from a capacity perspective, as the
equivalent of eight 5/8 x 3/4" customers. For instance, the customer with a 2" meter is,
from a capacity perspective, the equivalent of eight (8) single-family homes with 5/8 x
3/4" meters. Since a large portion of costs is generally related to meeting capacity
requirements, it is important to take capacity into account when establishing rates for
customers. The City's current meter charges do not follow these capacity ratings exactly
and reflect local and unique circumstances related to its larger metered customers.
The conceptual rate review undertaken indicates that the City's water rates are
contemporary and attempt to capture the cost differential to serve customers with varying
facility requirements based on their location.
10.1.1 o Overview of FutureWaterRates
Based upon the results of the financial analysis, the City will require adjustments in rates
in future years to meet the on-going operational and capital needs of the Water Utility.
Table 10-6 shows the level of rate adjustment needed in future years for the 5-year
projected period to meet operating and capital costs as identified within this plan.
Financial Plan
10- 12
2005 City of Bremerton Water System Plan
Table 10-6
Projected Rate Adjustments Needed from 2007 through 2011
Year 2007 2008 2009 2010 2011
Rate 10.0% 4.5% 5.0% 5.5% 5.5%
Adjustment
From the City's 2004 rate study and the updated revenue requirements in 2005, the City
has shown its commitment to implementing the necessary rate adjustments in order to
meet operating and capital costs and to meet debt service obligations. The adjustments
shown above will need to be applied to all portions of the rate design, or specific rate
design adjustments will need to be developed in order to ensure proper levels of revenue
are achieved to meet the overall revenue requirement of each year.
The City has expressed an interest in reviewing its' two'-tier conservation-based rates.
Some alternative rate structure options for the Cityto consider are described below.
10.1.11 Conservation-Based Rate Design Options
The City has implemented a number of conservation programs over the past several years.
In addition to these programs, water rates can be an effective tool in improving efficient
use of the water resource. A number of water rate structures can encourage efficient use
of the City's drinking water resources. These include inverted-block rates, seasonal rates,
and tailored rates. These rate designs require varying degrees of data and management
for implementation.
When considering conservation-based rate structures, certain rate structures are more
applicable for certain customer classes of service. This is because one of the approaches
in establishing conservation-based rates is to target the discretionary usage of the
customer.' Outdoor watering is considered a more discretionary use than indoor use.
Studies have consistently shown that the elasticity associated with outdoor use is more
sensitive to changes in price than indoor use. At the same time, an inverted-:block rate
structure for commercial customers may not be appropriate or difficult to establish given
the varying consumption patterns of these customers.
A first step towards implementation can be inverted-block rates, especially for residential
customers. Fora residential rate structure, the block sizes or tiers are generally sized
around average indoor use, average outdoor use, and inefficient or wasteful use. The
number of blocks or tiers may Vary, but generally some rationale exists for establishing
the various block sizes and targeted consumption (discretionary vs. non-discretionary).
The pricing of each block increases - use more, pay more. As a point of reference, the
City implemented a first step in an inverted'-block, or tiered rates, in 2005. The City may
further refine these rates and is evaluating the potential of other measures to encourage
Financial Plan
10-13
2005 City of Bremerton Water System Plan
water resource conservation. These rate refinements will be reviewed later in 2006 along
with other conservation measures.
Seasonal rates are another alternative for consideration. In some cases, inverted block
rates may not be appropriate for certain types of customers, but seasonal pricing may be.
The intent of seasonal pricing is to provide a price signal to the customer of the higher
costs associated with summer peak use. Seasonal rates can also be combined with
inverted block or tiered rates.
A relatively new conservation-based rate structure is a water budget or tailored rates. In
simplistic terms, these are a variation of an inverted block rate, but the size of each block
is individually determined for each customer based upon the number of inhabitants in the
home, lot size, irrigation requirements, etc. These rate forms have had very limited
introduction into the water utility industry due to a number of factors. Among these are
the very high administrative costs associated with implementing these rates and
determining individual customer block sizes. At the same time, most, if not all, utility
billing programs are unable to handle thisparticular rate structure without some custom
programming. Where water budget rate structures do seem to have an excellent
application is for irrigation customers. The block sizes for the irrigation customer are
tailored for the specific property being irrigated.
10.1.12 Summary
The financial plan results presented in this section indicate water rates for the six-year
projected time horizon of 2006 to 2011 will require adjustments to fund the projected
operations and maintenance, capital, and debt service requirements. The City has an
interest in enhancing the conservation message within the existing rate structure some
time in the near future. The City is committed to the responsible management of the
Water Utility by past rate adjustments and by funding adequate levels of operations,
capital, and reserves. Continued fiscal management will enable the Utility to continue to
operate on a financially sound basis.
10.2 References
A WWA C-700 Cold Water Meters - Displacement Type for 5/8x3l4" meter.
City of Bremerton. Rate Study. HDRlEES. 2004.
Financial Plan
10-14
City of Bremerton - Water Department - Water Utility
SUMMARY OF SOURCES AND
APPLICATIONS OF FUNDS
2006 2007 2008 2009 2010 2011
SOURCES OF FUNDS
Water Sales $6,068,728 $6,129,415 $6,190,709 $6,252,617 $6,315,143 $6,378,294
Navy (PSNS) Sales 1,305,740 1,305,740 1 ,305,740 1,305,7 40 1,305,740 1,305,740
Timber Sales (included within the capital fund) 0 0 0 0 0 0
Other Revenue 464,500 468,230 471 ,997 475,802 479,645 483,527
Total Sources of Funds $7,838,968 $7,903,385 $7,968,447 $8,034,159 $8,100,528 $8,167,561
APPLICATIONS OF FUNDS
O&M Expenses Plus Taxes $6,858,188 $6,963,839 $7,262,443 $7,563,102 $7,866,823 $8,373,871
Capital Outlays from Rates 300,000 700,000 700,000 721,000 743,000 765,000
Debt Service 765,183 816,970 900,417 1 ,057,985 1 ,163,715 1 ,383,566
TOTAL NET REVENUE REQUIREMENT $7,923,371 $8,480,809 $8,862,860 $9,342,088 $9,773,538 $10,522,437
BALANCE/DEFICIENCY OF.FUNDS ($84,403) ($577,423) ($894,413) ($1,307,929) ($1,673,010) ($2,354,876)
Plus: Add'l Taxes w/Rate Increase $0 ($90,342) ($139,937) ($204,635) ($261,754) ($368,437)
TOTAL BALANCE OF FUNDS ($84,403) ($667,765) ($1,034,350) ($1,512,564) ($1,934,764) ($2,723,314 )
RATE ADJUSTMENT REQUIRED 1.1% 9.0% 13.8% 20.0% 25.4% 35.4%
PROPOSED RATE ADJUSTMENT 0.0% 10.0% 4.5% 5.0% 5.5% 5.5%
ADDITIONAL REVENUE WITH RATE ADJUSTMENT $0 $743,516 $1,120,719 $1,564,391 $2,083,234 $2,638,646
BALANCE/DEFICIENCY OF FUNDS ($84,403) $75,750 $86,369 $51,827 $148,470 ($84,667)
ADDITIONAL RATE ADJUSTMENT REQUIRED 1.1% -0.9% -1.0% -0.6% -1.5% 0.8%
Working Capital
Beginning Balance $2,155,257 $3,220,854 $3,296,604 $3,382,973 $3,434,800 $3,583,270
Plus: Additional 1,150,000 75,750 86,369 51,827 148,470 0
Less: Transfer to Capital Fund 0 0 0 0 0 0
Less: Uses (84,403) 0 0 0 0 (84,667)
Ending Working Capital $3,220,854 $3,296,604 $3,382,973 $3,434,800 $3,583,270 $3,498,603
Minimum Target 12% of Tota/Expenses $1,142,805 $1,269,697 $1,377,343 $1,134,465 $1,180,023 $1,256,081
Capital Fund
Ending Balance $0 $86,000 $421,000 $1,207,000 $460,000 $720,000
Total Working Capital and Capital Fund $3,220,854 $3,382,604 $3,803,973 $4,641,800 $4,043,270 $4,218,603
Debt Service Coverage Ratio- Water Utility - All Debt
Before Rate Increase 4.20 3.63 2.92 2.16 1.77 1.17
After Rate Increase 4.20 4.54 4.16 3.64 3.56 3.08
CITY OF BREMERTON
WATER DEPARTMENT
EXHIBIT 1
ESCALATION FACTORS
2006 2007 2008 2009 2010 2011
Escalation Factors
Revenues:
Other Revenues 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%
Expenses:
Power 3.00% 3.00% 3.00% 3.00% 3.00% 3.00%
Labor (68% @ 3%,12%@3%, 20%@26%-medical) 7.60% 7.60% 7.60% 7.60% 7.60% 7.60%
Materials & Supplies 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%
Equipment 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%
Miscellaneous 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%
Depreciation 3.00% 3.00% 3.00% 3.00% 3.00% 3.00%
New Debt Service:
Long Term Debt
Term in Years 20 20 20 20 20 20
Rate 6.0% 6.0% 6.0% 6.0% 6.0% 6.0%
Long Term Debt (DWSRF Loan)
Term in Years 20 20 20 20 20 20
Rate 1.5% 1.5% 1.5% 1.5% 1.5% 1.5%
Interest Rates
Interest Income 3.0% 3.0% 4.0% 4.0% 4.0% 4.0%
Growth 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
CITY OF BREMERTON Page 1 of 7
WATER DEPARTMENT
EXHIBIT 2
SOURCES AND APPLICATIONS OF
FUNDS
2006 2007 2008 2009 2010 2011 Basis of Classification
SOURCES OF FUNDS
Rate Revenues
.101,34.343.4001 Water Sales Retail $6,068,728 $6,129,415 $6,190,709 $6,252,617 $6,315,143 $6,378,294 Rev Rpt@ 1% growth
.101.34.343.4002 PSNS Sales 1,305,740 1 ,305,740 1 ,305,740 1 ,305,740 1 ,305,740 1 ,305,740 Flat
Total Rate Revenues $7,374,468 $7,435,155 $7,496,449 $7,558,357 $7,620,883 $7,684,034
Other Revenues
Discretionary Revenue' $0 $0 $0 $0 $0 $0 One ti me 2004
'101.34.341.4300 Billing Services 11,000 11,110 11,221 11,333 11,447 11,561 As Other Revenue
.10\.34.341.5000 General Gov\. (sale of maps/marine bill) 1,000 1,010 1,020 1,030 1,041 1,051 As Other Revenue
.101.34.342.4007 Mise Inspections 0 0 0 0 0 0 As Other Revenue
401.34.343.4002 Other Service Char~Jes 100,000 101,000 102,010 103,030 104,060 105,101 As Other Revenue
<101.34.343.4006 Water Connection /Other Charges 150,000 151,500 153,015 154,545 156,091 157,652 As Growth
401.34.345.8300 PlanChecking Fees 1,000 1,010 1,020 1,030 1,041 1,051 As Other Revenue
401.34.362.500\ Park. Facilities Rentals 1,000 1,000 1,000 1,000 1,000 1,000 Flat
0\01.34.366.1000 Interfund Interest 0 0 0 0 0 0 One time 2004
401.34.361.1100 Investmenllnterest 25,000 25,250 25,503 25,758 26,015 26,275 As Other Revenue
0101.34.362.5002 L.T. Facilities Lease 75,000 75,750 76,508 77,273 78,045 78,826 As Other Revenue
401.34.362.6001 Housing Rentals - U\i.lity 4,000 4,000 4,000 4,000 4,000 4,000 Flat
401.34.366.2000 Intertund Rents 20,000 20,000 20,000 20,000 20,000 20,000 Flat
401.34.368,1000 ULlD Special Assessments 61,500 61,500 61,500 61,500 61,500 61,500 Flat
<101,34.359.4000 Judgements and Settlements 5,000 5,000 5,000 5,000 5,000 5,000 Flat
401.34.:369.9000 Other Misc. Revenue. 10,000 10,100 10,201 10,303 10,406 10,510 As Other Revenue
Total Olher Revenu()s $464,500 $468,230 $471,997 $475,802 $479,645 $483,527
Total Revenues $7,838,968 $7,903,385 $7,968,447 $8,034,159 $8,100,528 $8,167,561
APPLICATIONS OF fUNDS
'101.34.534.1034 Water Administration
X.X.X.X.51QQt Labor/Benefits $247,097 $265,876 $286,083 $307,825 $331,220 $356,393 As Labor
>:'.X.X.X.50750 Reallocated Equipment Costs 0 0 0 0 0 0 As Equipment
x..X.>:'.X.53110 Office & Operating Supplies 15,000 15,150 15,302 1 5,455 15,609 15,765 As MaUSupplies
X,X.X,X.53119 Office Supplies - Interfund 0 0 0 0 0 0 As MaUSupplies
X.X,X.X.53510 Small Tools & Equipment 3,200 3,232 3,264 3,297 3,330 3,363 As Equipment
X,XXX.53530 Computer Related lIems 2,000 2,020 2,040 2,061 2,081 2,102 As Equipment
x..X.X.X.54000 Reallocated Vehicle Costs 0 0 0 0 0 0 As Equipment
X.X..X.X..54110 Prof.. Services 0 0 0 0 0 0 As Misc.
X.X..X.X.54119 Professional Services - Interfund 466,248 470,910 475,620 480,376 485,180 490,031 As MiSC.-General Fund
X..X.X.X.54210 Telecommunications 40,000 40,400 40,804 41,212 41,624 42,040 As Misc.
X.X.X.X..54220 Postage 2,000 2,020 2,040 2,061 2,081 2,102 As Misc.
X..X.X..X.54300 Travel 3,000 3,030 3,060 3,091 3,122 3,153 As Misc.
X..X.X.X..54400 Advertising 500 505 510 515 520 526 As Misc.
X.X.X.X.54520 Equipment Rental 4,000 4,040 4,080 4,121 4,162 4,204 As Equipment
X.X.X.X.54529 EqUipment Rentallnterfund. 10,212 10,314 10,417 10,521 10,627 10,733 As Equipment
X.X.X.X.54619 Insurance Premiums - Interfund 146,281 147,744 149,221 150,713 152,221 153,743 As Misc. - Risk Management
X..X.X..X.54809 Information Technology 13,325 13,458 13,593 13,729 13,866 14,005 As Misc.
X.X.X.X.54Bl0 Equipment Repair 14,666 14,813 14,961 15,110 15,261 15,414 As Misc.
x.x..X.X.54910 Miscellaneous 12,000 12,120 12,241 12,364 12,487 12,612 As Misc.
Total Administration $979,529 $1,005,633 $1,033,237 $1,062,451 $1,093,392 $1,126,186
CITY OF BREMERTON Page 2 of 7
WATER DEPARTMENT
EXHIBIT 2
SOURCES AND APPLICATIONS OF
FUNDS
2006 2007 2008 2009 2010 2011 Basis of Classification
534.7034 Customer Service
X.X.X.X.51001 Reallocated Lat,or Costs $207,184 $222,930 $239,873 $258,103 $277,719 $298,825 As Labor
X.X.X.X.53110 Office & Operating Supplies 5,000 5,050 5,101 5,152 5,203 5,255 As Mat/Supplies
XXXXS3S3SI0 Small Tools and Equipment 0 0 0 0 0 0 As Equipment
X.X.XXS3S30 Computer Related Items 46,500 46,965 47,435 47,909 48,388 48,872 As Equipment
X.X.X.X.S4000 Reallocated Vehicle Costs 0 0 0 0 0 0 As Equipment
X.X.X.X.S411 0 Professional Services (PSE billing) 5,000 5,050 5,101 5,152 5,203 5,255 As Misc.
X.X.XXS4119 Professional Services Interlund 0 0 0 0 0 0 As Misc.
X.X.XXS4210 Telecommunication 0 0 0 0 0 0 As Misc.
X.X.x.X.54220 Postage 25,000 25,250 25,503 25,758 26,015 26,275 As Misc.
XXXXS4300 Travel 0 0 0 0 0 0 As Misc.
X,X.X,X,S4520 Equipment Rental 1,783 1,801 1,819 1,837 1,855 1,874 As Equipment
X.X.XXS4809 Information Technology 8,885 8,974 9,064 9,154 9,246 9,338 As Misc.
XXXXS4810 Equipment Repair 1,615 1,631 1,647 1,664 1,681 1,697 As Misc.
X.X.XXS4910 Miscellaneous 20,000 20,200 20 ,402 20,606 20,812 21,020 As Misc.
Total Cust. Service & Marketing $320,967 $337,851 $355,943 $375,334 $396,122 $418,413
Total Water Administration $1,300,496 $1,343,484 $1,389,180 $1 ,437,784 $1,489,514 $1,544,599
Engineering
534.8037 Operations
XXX.X.SIOOI Reallocated Latlor Costs $271,925 $292,591 $314,828 $338,755 $364,501 $392,203 As Labor
XXXXS3120 Office & Operating Supplies 3,000 3,030 3,060 3,091 3,122 3,153 As Mat/Supplies
X.XXX.53510 Small Tools &. Equipment 1,000 1,010 1,020 1,030 1,041 1,051 As Equipment
XXX.X.S3S30 Computer Related items 6,000 6,060 6,121 6,182 6,244 6,306 As Equipment
XXXXS4000 Reallocated Vellicle Costs 0 0 0 0 0 0 As Equipment
XXXXS4IIO Prof. Services - External 35,000 35,350 35,704 36,061 36,421 36,785 As Misc.
X,X.X.X.S421D Telecommunications 600 606 612 618 624 631 As Misc.
XXXXS4300 Travel 1,000 1,010 1,020 1,030 1,041 1,051 As Misc.
XXX.X.S4220 Postage 100 101 102 103 104 105 As Misc.
X.X.X.X.54119 Advertising 0 0 0 0 0 0 As Misc.
XXXXS4S20 Rents - Equipment 10,736 10,843 10,952 11,061 11,172 11,284 As Equipment
X.X.XXS4809 Information Technology 18,358 18,542 18,727 18,914 19,103 19,294 As Misc.
XXXXS810 Equipment Repair 11,768 12,662 13,625 14,660 15,774 16,973 As Labor
X.X.X.X.54910 Miscellaneous 1,000 1,010 1,020 1,030 1,041 1,051 As Misc.
Total Engineering Operations $360,487 $382,816 $406,791 $432,536 $460,187 $489,887
CITY OF BREMERTON Page 3 of 7
WATER DEPARTMENT
EXHIBIT 2
SOURCES AND APPLICATIONS OF
FUNDS
2006 2007 2008 2009 2010 2011 Basis of Classification
401.31 Water Resource Manager
X.X.534.5031 Maintenance
X.X.X.X.50700 Reallocated Latlor Cost $252,700 $271,905 $292,570 $314,805 $338,731 $364,474 As Labor
XXXXS311Q Office & Operating Supplies 45,000 45,450 45,905 46,364 46,827 47,295 As Mat/Supplies
X.X.X.X.53i21 Utility Inventory 1,500 1,515 1,530 1,545 1,561 1,577 As Mat/Supplies
X.X.X.X.53119 Operating Supp.- Interiund 0 0 0 0 0 0 As Mat/Supplies
X.X.X.X.53219 Fuel Consumed - IFD 0 0 0 0 0 0 As Misc.
XXX.X.53510 Small Tools & Equipment 12,000 12,120 12,241 12,364 12,487 12,612 As Equipment
X.X.X.X,53530 Computer Related Items 4,000 4,040 4,080 4,121 4,162 4,204 As Equipment
X.X.XX53520 Small Equipment & Furniture 0 0 0 0 0 0 As Equipment
X.X.X.X.54QOO Reallocated Vehicle Costs 0 0 0 0 0 0 As Equipment
X.X,X,X.5411D Professional Services - External 25,000 25,250 25,503 25,758 26,015 26,275 As Misc.
XXX.X.54220 Postage 0 0 0 0 0 0 As Mat/Supplies
X.X.X.X.5452D Equipment 3,000 3,030 3,060 3,091 3,122 3,153 As Equipment
XXXX54740 Garbage 0 0 0 0 0 0 As Misc.
X,XXX.5481Q Equipment Repair 5,000 5,050 5,101 5,152 5,203 5,255 As Equipment
XXX.X.54619 Equipment Repair - Interiund 0 0 0 0 0 0 As Equipment
XXX.X.54620 Other Improvements 5,000 5,050 5,101 5,152 5,203 5,255 As Misc.
X.X.X.X.5463D Structures &Grounds Repair 185,000 186,850 188,719 190,606 192,512 194,437 As Misc. for Reservoirs
XXX.X.54910 Miscellaneous 5,000 5,050 5,101 5,152 5,203 5,255 As Misc.
Total Maintenance $543,200 $565,310 $588,909 $614,108 $641,026 $669,792
X.X.534.7031 Customer Service
XXX.X.50700 Reallocated Labor Costs $11,919 $12,825 $13,800 $14,848 $15,977 $17,191 As Labor
XXXX53120 Office & Operating Supplies 5,000 5,050 5,101 5,152 5,203 5,255 As Mat/Supplies
X.x.X.X.53121 Utility Inventory 0 0 0 0 0 0 As Mat/Supplies
XXXX53510 Small Tools I'; Equipment 500 505 510 515 520 526 As Equipment
X.XXX.54DOO Reallocated Vel1icle Costs 0 0 0 0 0 0 As Equipment
XXX.X.541! 0 Prof. Services E:xternal 7,500 7,575 7,651 7,727 7,805 7,883 As Misc.
X.XXX.5422D Postage 100 101 102 103 104 105 As Mat/Supplies
XXXX54300 Travel 0 0 0 0 0 0 As Misc.
XXX.X.54400 Advertising 500 505 510 515 520 526 As Misc.
X.X.X.X.54520 Renls - Equipment 0 0 0 0 0 0 As Misc.
XXX.X.54910 Miscellaneous 4,000 4,040 4,080 4,121 4,162 4,204 As Misc.
Total Cust. Service $29,519 $30,601 $31,753 $32,982 $34,291 $35,689
CITY OF BREMERTON Page 4 of 7
WATER DEPARTMENT
EXHIBIT 2
SOURCES AND APPLICATIONS .OF
FUNDS
2006 2007 2008 2009 2010 2011 Basis of Classification
:<'x'S34.e031 Operations
X.X.X.X.51QOl Reallocated Labor Costs $483,548 $520,298 $559,840 $602,388 $648,170 $697,431 As Labor
x.X.X.X.53110 Oltice & Operating Supplies 60,000 60,600 61,206 61,818 62,436 63,061 As Mat/Supplies
X.X,X.X.53121 Utility Inventory 0 0 0 0 0 0 As Mat/Supplies
x.X.X.X.5321Q Vehicle Fuel 0 0 0 0 0 0 As Equipment
X,XXX.53510 Small Tools & Equipment 40,000 40,400 40,804 41,212 41,624 42,040 As Equipment
X.X.X,X.S3530 Computer Related Items 2,000 2,020 2,040 2,061 2,081 2,102 As Equipment
X,X.X.X.54QOQ Reallocated Vehicle Costs 0 0 0 0 0 0 As Equipment
X.X.XXS411O Professional Services - External 265,000 101,000 102,010 103,030 104,060 185,101 As Misc.; Comp Planning 06/11
new Monitoring Crypto/Giardia 0 4,500 5,850 1,350 0 0 Camp Plan Estimates
new Monitoring Radionuciides 0 0 1,350 0 0 1,350 One-time costs: From City
new IDSE Plan 0 10,000 18,000 22,000 0 8,000 Draft Estimates
new New UV Treatment O&M 0 0 0 0 0 63,000 New O&M Costs; As Labor
new UCMR 0 0 5,000 5,000 0 0 One-time costs: From City
x.X,X.X.5421Q Telephone 8,000 8,080 8,161 8,242 8,325 8,408 As Misc.
x.X.XXS4220 Postage 500 505 510 515 520 526 As Mat/Supplies
x.X.x.X.S4300 Travel 2,500 2,525 2,550 2,576 2,602 2,628 As Misc.
X.X.X.X.544QD Advertising 0 0 0 0 0 0 As Misc.
X.X.X.X.5<l520 Equipment 14,604 14,750 14,898 15,047 15,197 15,349 As Equipment
XXX,X.5<l710 Natural Gas 2,000 2,020 2,040 2,061 2,081 2,102 As Misc.
XXX.X.54720 Electricity 285,000 293,550 302,357 311,427 320,770 330,393 As Power
XXXX.54730 Water/Sewer/Stormwater 400 404 408 412 416 420 As Misc.
x. x. x. X.54809 Information Technology 27,142 27,413 27,688 27,964 28,244 28,527 As Misc.
X.X.X.X.5481Q Equipment Repair 29,349 29,642 29,939 30,238 30,541 30,846 As Equipment
X.X.X.X.54820 Repairs - Other Improvements 5,000 5,050 5,101 5,152 5,203 5,255 As Misc.
X.X.X.X.54830 Structures & Ground Repair 15,000 15,150 15,302 15,455 15,609 15,765 As Misc.
x.X.X.X.5491Q Miscellaneous 32 ,200 32,522 32,847 33,176 33,507 33 ,843 As Misc.
Total Operations $1 ,272 ,243 $1,170,430 $1,237,900 $1,291,123 $1,321,387 $1,536,145
Total Water Resources $1,844,962 $1,766,341 $1,858,562 $1,938,212 $1,996,704 $2,241,627
Wastewater Manager
'5341.9032 Other Operations - Bioso/ids
XXX.X.SIOOl Reallocated Labor Costs $83,200 $89,523 $96,327 $103,648 $111,525 $120,001 As Labor
X.X.X.X.53110 Office & Operating Supplies 60,000 60,600 61,206 61,818 62,436 63,061 As Mat/Supplies
X.X.x.X.53121 Utility Inventory 0 0 0 0 0 0 As Mat/Supplies
XXX.X.5351O Small Tools & Equipment 0 0 0 0 0 0 As Equipment
X.XXX.54000 Reallocated Vehicle Costs 0 0 0 0 0 0 As Equipment
X.XXX.54,10 Prof. Services - External 0 0 0 0 0 0 As Misc.
X.XXX.54720 Electricity 9,500 9,785 10,079 10,381 10,692 11,013 As Power
x.XXX.S81Q Equipment Repair 0 0 0 0 0 0 As Misc.
X.X.X.X.54910 Miscellaneous 0 0 0 0 0 0 As Misc.
Total Wastewater Manager $152,700 $159,908 $167,612 $175,847 $184,654 $194,075
CITY OF BREMERTON Page 6 017
WATER OEPARTMENT
EXHIBIT 2
SOURCES AND APPLICATIONS OF
FUNDS
2006 2007 2008 2009 2010 2011 Basis of Classification
53~.90J9 Other Operations
)(x,x.x.51oo1 Reallocated Labor Cost $336,356 $361,919 $389,425 $419,021 $450,867 $485,133 As Labor
X.X,X.)(,51060 Overtime Pay (Cops Watershed Palrol) 0 0 0 0 0 0 As Labor
X.X.X.X,SJ110 Office & Opera ling Supplies 25,000 25,250 25,503 25,758 .26,015 26,275 As MaVSupplies
X.)(.)(,X,53121 Ulility Invenlory 100 101 102 103 104 105 As MaVSupplies
X,X.X.X,53119 Operating Supplies. .lnterfund 0 0 0 0 0 0 As MaVSupplies
X.X.X,X,53210 Vehicle Fuel 0 0 0 0 0 0 As Misc.
X,X.X,)(.53510 Small Tools & Equipment 1,500 1,515 1,530 1,545 1,561 1,577 As' Equipment
X,X,X.X,5:l530 Computer Related Items 500 505 510 515 520 526 As' Equipment
X.X,X.)(.54ooo Reallocated Vehicle Costs. 0 0 0 0 0 0 As Equipmenl
X,X,)(.X,5-/.110 Professional Services ~ External 25,000 25,250 25,503 25,758 26,015 26,275 As Mlsc./biosollds mgmt, mise
X,)(.X,X.54210 T elecommunicalions 500 505 510 515 520 526 As Misc.
X.lCX'x'54220 Postage 250 253 255 258 260 263 As MaVSupplies
X.X.X.X,0..3OO Travel 1,000 1,010 1,020 1,030 1,041 1,051 As Misc.
X.)(.X.)(.544oo Advertising 100 101 102 103 104 105 As Misc.
X.X.X'x'54520 Equipment 1,500 1,515 1,530 1,545 1,561 1,577 As Equipment
X.X.X.x.545<'9 Equipment. lnlerfund 31,446 31,760 32,078 32,399 32,723 33,050 As Equipmenl
X.lCX.x.54710 Natural Gas 1,500 1,515 1,530 1,545 1,561 1,577 As Misc.
X.)(,)(.X.54720 Electricity 3,000 3,090 3,183 3,278 3,377 3,478 As Power
xX.X.X.SH.O Garbage 500 505 510 515 520 526 As Misc.
X,X.X.)(.54809 Inlormation Technology 7,403 7,477 7,552 7,627 7,704 7,781 As Misc.
X,X,X,X 54810 Equipmenl Repair 16,971 17,141 17,312 17,485 17,660 17,837 As Misc.
X.X.X.X.5482O Other Improvements 1;000 1,010 1,020 1,030 1,041 1,051 As Misc.
X.X.X.x.5<48JO Slructures & Grounds 1;000 1,010 1,020 1,030 1,041 1,051 As Misc.
X.X.X.X.54910 Miscellaneous 20,000 20,200 20,402 20,606 20,812 21,020 As Misc.
Total Other Operations $474,626 $501,632 $530,597 $561,668 $595,006 $630,781
Total Forestry $589,693 $620,673 $653,866 $689,439 $727,572 $768,457
Total O&M Expense $5,852,484 $5,966,925 $6,265,736 $6,566,520 $6,861,782 $7,360,286
TaxeslTranster Payment:s.
X.X.X.X.55100 Intergovern Service & Ta:( $370,862 $373,914 $376,996 $380,110 $383,254 $386,430 5.029% of water sales
X.X.X.X.5S409 Payment In-Lieu 01 Taxes 634,842 623,000 619,710 616,472 621,787 627,155 8.5% 01 Retail Rate Rev T Timber
ULlD Payment (12%) 0 0 0 0 0 0 One Time
ULlD Paymenl (City Ownership) 0 0 0 0 0 0 One Time
X.X.X.X.55300 External Taxes & Assessments 0 0 0 0 0 0 DOH Connection Surcharge
Total TaxeslTranslerPayments $1,005,704 $996,914 $996,707 $996,582 $1,005,041 $1,013,585
Total O&M Plus Taxes $6,858,188 $6,963,839 $7,262,443 $7,563,102 $7,866,823 $8,373,871
Debt Service
Existing PWTF 36~ Water Main GiJrst $187,342 $185,684 $184,026 $182,368 $180,710 $179,053 Debt Schedule
PWTF Tracy ton 12,681 12,483 12,285 12,087 11,889 11,691 Est. Repmt Sched.
Existing DWSRF. Corrosion Clrl/I'eserv #4 $76,526 $74,564 $72,601 $70,601 $68,601 $66,601 Estimated Repayment Schedule
Existing DWSRF. Casad Dam Se'ismic Intake Tower 54,239 52,840 50,327 48,427 46,527 44,627 Estimated Repayment Schedule
Existing DWSRF. East West Flow .Imprvmts 69,409 81,945 80,945 79,945 78,945 77,945 Estimated Repaymenl Schedute Aclive
Existing DWSAF ' PS #4 Upgrade 68,197 74,926 73,926 72,926 71,926 70,926 Estimated Repayment Schedule ActJve
Existing DWSAF. Tracylon 195,415 191.926 188,436 186,436 184,436 182,436 Estimaled Aepayment Schedule
Existing DWSRF. Casad Dam H.B Valve 4,994 4,935 4,876 4,788 4,699 4,611 Estimated Repayment Schedule
DWSAF. NAD Park Bani, Stabilizalion 2,071 2,046 2,022 1,985 1,948 1,911 Eslimated Repayment Schedule
DWSRF . Anderson Creek Chlorine Generator 5,882 6,852 6,352 5,852 5,352 4,852 Estimated Repayment Schedule
DWSRF. Aeservoir Seismic Valv/Upgrades 21,741 21,487 21,234 20,854 20,473 20,093 Estimated Aepayment Schedule
Port 01 Bremerton Rap 0 0 0 0 0 114,121 Port reservoir payment in 2011 Sold their reservl
ULlD 61,500 61,500 61,500 61,500 61,500 61,500 Balanced to ULlD revenue
Exisling Other. Capital Lease Pitney Bow 5,186 0 0 0 0 0 Capital Lease; ends 2006
New DWSRF Loan 0 45,781 141 ,887 310,217 426,708 543,200 new debt assumptions
Sublotal DWSAF $565,160 $618,803 $704,106 $863,530 $971,116 $1,192,822 Calculated
CITY OF BREMERTON Page 7 of 7
WATER DEPARTMENT
EXHIBIT 2
SOURCES AND APPLICATIONS OF
FUNDS
2006 2007 2008 2009 2010 2011 Basis of Classification
New Revenue Bond $0 $0 $0 $0 $0 $0
Total Debt Service $765,183 $816,970 $900,417 $1,057,985 $1,163,715 $1,383,566
Net Revenue Available for Capital Funding $215,597 $122,577 ($194,413) ($586,929) ($930,010) ($1,589,876)
Capital Improvements
Net CIP From Rates $300,000 $700,000 $700,000 $721,000 $743,000 $765,000 From Capital Plan
Cash Working Capital $0 $0 $0 $0 $0 $0
TOTAL NET REV. REQUIREMENT $7,923,371 $8,480,809 $8,862,860 $9,342,088 $9,773,538 $10,522,437
Balance/(Deficiency) of Funds ($84,403) ($577,423) ($894,413) ($1,307,929) ($1 ,673,010) ($2,354,876)
Plus: Additional Taxes wlRate Increase $0 ($90,342) ($139,937) ($204,635) ($261,754) ($368,437)
Total Balance/(Deficiency) of Funds ($84,403) ($667,765) ($1,034,350) ($1,512,564) ($1,934,764) ($2,723,314)
Totallnc.l(Decmase) as a % of Rates 1.1% 9.0% 13.8% 20,0% 25.4% 35.4%
Debt Service Coverage Ratio - Water Utility - All Debt
Before Rate Increase 4.20 3.63 2.92 2.16 1.77 1.17
After Rate Increase 4.31 4.44 4.06 3.59 3.43 3.14
Debt Service Coverage Ratio - Water Utility - Revenue Bond Debt
Before Rate Increase 0.00 0.00 0.00 0.00 0.00 0.00
After Rate Increase 0.00 0.00 0.00 0.00 0.00 0.00
Debt Service Coverage Ratio - Combined Utility
Before Rate Increase 1.33 1.24 2.21 1.75 1.53 1.24
After Rate Increase 1.90 2.02 3.89 3.41 3.36 3.18
Debt service coverage = 1.30
Gross revenue of the system = all the earnings and revenue received by the system from any source including sale of forest products,
except; general ad valorem taxes, grants, refunded bond escrow acct earnings, gifts to system for capital purposes, proceeds from sale
of city property, proceeds from city or system obligations
Operating and Maintenance expenses = all reasonable expenses incurred by the City including insurance premiums, state imposed taxes
payment to another agency for treatment or sewage disposal, excluding depreciation, city imposed utility taxes or PILOT.
CITY OF BREMERTON
WATER DEPARTMENT Page 1 of 2
EXHIBIT 2A
CAPIT Al FUNDING ANALYSIS SUMMARY
2006 2007 2008 2009 2010 2011 Total
Beginning Balance $0 $0 $86,000 $421,000 $1,207,000 $460,000
Total Capital Projects
Annual Substandard Water Main Replacement Program 200,000 200,000 200,000 300,000 300,000 325,000 $1,525,000
Annual Distribution Main Replacements' 200,000 500,000 800,000 1,000,000 500,000 500,000 3,500,000
Annual Misc. Cap. Improv. Water Resources Division 100,000 100,000 100,000 100,000 100,000 125,000 625,000
Annual Misc. Equipment Water Operations Division 15,000 15,000 15,000 15,000 15,000 15,000 90,000
Annual Acquisition of Replacment Meters 0 0 0 0 0 0 0
Annual Tap/Meters 65,000 65,000 65,000 65,000 65,000 70,000 395,000
Annual Meter Replacements 100,000 100,000 100,000 100,000 100,000 150,000 650,000
Annual Fire Hydrants 20,000 20,000 20,000 20,000 20,000 20,000 120,000
Anderson CreekWellfield Improvements 400,000 0 0 0 0 0 400,000
West 580 Zone Development 40,000 0 0 0 0 0 40,000
Ultra Violet Treatment Facility 60,000 300,000 700,000 0 2,000,000 2,000,000 5,060,000
Pump Station #4 Upgrade and Transmission Main 400,000 0 0 0 0 0 400,000
Water Meters, Extra Large Replacements 150,000 150,000 0 0 0 0 300,000
Water System Security Improvements 50,000 50,000 0 0 0 0 100,000
MeKenna Falls Road Repair 50,000 0 0 0 0 0 50,000
Anderson Creek'Chlorination Upgrades 50,000 0 0 0 0 0 50,000
Reservoir #12 Roof Replc. And Seismic Upgrades 0 400,000 0 0 0 0 400,000
Booster Sta. #3 Abandonment and Zone Improvements 0 0 300,000 0 0 0 300,000
Watershed land. Purchases 0 300,000 0 0 0 0 300,000
Reservoir 15,18,17,19,20 5 Seismic Isolation Valves 0 150,000 0 0 0 0 150,000
Well 22 Pump and Controls 0 120,000 0 0 O. 0 120,000
Pressure Regulating Valves 0 50,000 50,000 0 0 0 100,000
Warren and Manette Isolation Valves 0 0 100,000 0 0 0 100,000
McKenna Falls Wier 0 75,000 0 0 0 0 75,000
Trailer Mounted Generator 0 75,000 0 0 0 0 75,000
Pump Station 17 MCC/Gorst.Coritrol Valve 0 50,000 0 0 0 0 50,000
Heinz Creek Bridge (2000 Rd Cuvert) 0 50,000 0 0 0 0 50,000
Reservoir 8 Drain 0 30,000 0 0 0 0 30,000
13 Street, Ohio Street and High Str. . 12" Distribution Main 0 0 30,000 0 850,000 0 880,000
Upgrade Disinfection Sys. For Union River Supply 0 0 50,000 0 0 500,000 550,000
Gold Mtn. Gold Course Irrigation 0 0 50,000 0 350,000 0 400,000
Well1R Upgrades 0 0 200,000 0 0 0 200,000
Forestry Offices Upgrades 0 0 150,000 0 0 0 150,000
Manette Breidge.Water Main 0 0 75,000 0 0 0 75,000
Casad Dam Early Warning System 0 0 60,000 0 0 0 60,000
C Street from Oyster Bay to National Ave. . 24" Pipe 0 0 250,000 1 ,750,000 0 0 2,000,000
Oyster Bay Remodel and Expansion 0 0 0 375,000 0 0 375,000
Reservoir #14 Demolition 0 0 0 25,000 275,000 0 300,000
Hardening of Casad Dam Overflow 0 0 0 200,000 0 0 200,000
Well 18 Pump and Motor 0 0 0 75,000 0 0 75,000
Twin Lakes Diversion Improvements 0 0 0 0 75,000 0 75,000
Emergency Source Upgrades 0 0 0 0 40,000 0 40,000
0 0 0 0 0 0 0 0
Distribution Projects; Additional Storage 0 0 0 0 0 0 0
Total Project Costs $1,900,000 $2,800,000 $3,315,000 $4,025,000 $4,690,000 $3,705,000 $20,435,000
CITY OF BREMERTON
WATER DEPARTMENT Page 2 of 2
EXHIBIT 2A
CAPITAL FUNDING ANALYSIS SUMMARY
2006 2007 2008 2009 2010 2011 Total
Less: Funding Sources
Annual Rate Funded Capital $300,000 $700,000 $700,000 $721,000 $743,000 $765,000 $3,929,000
System Development Chaq)es 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000
Timber Sales. 1,400,000 1,200,000 1,100,000 1,000,000 1,000,000 1,000,000 6,700,000
Intergovernmental (loan/grant proceeds) 0 0 0 0 0 0 0
Non-taxable Sale 0 0 0 0 0 0 0
Grants 0 0 0 0 0 0 0
From Cash Reserves 0 0 0 0 0 0 0
State Loan - DWSRF 0 786,000 1,650,000 2,890,000 2;000,000 2,000,000 9,326,000
Interfund Loan Payment- Pendergast 0 0 0 0 0 0 0
Revenue Bonds 0 0 0 b 0 0 0
Total Funding Sources $1,900,000 $2,886,000 $3,650,000 $4,811,000 $3,943,000 $3,965,000 $21,155,000
Additional Capital Funding $0 $0 $0 $0 $0 $0
Ending Capital Reserves $0 $86,000 $421 ,000 $1,207,000 $460,000 $720,000
Target Funding; Annual Average Capital or $3,410,000
1.5% of Original Plant Value $1,400,000
Appendices
Department of Health Water System Plan Submittal Form and Checklist
Water Facilities Inventory
2005 Consumer Confidence Report
State Environmental Policy Act Checklist and Determination of Non-significance
Public Meeting Documentation
Water Use Efficiency Plan
Consistency Statements and Agency Review Comments
Distribution Improvements Projects List
Water System Plan Submittal Form
Systems 08200R and 082734
11) SYSTEM NAME 2) SYSTEM ID # 3) SYSTEM OWNER
City of Bremerton 08200R and City of Bremerton
082734
OtfTACT NAME FOR VTIUTY PHONE NUMBER TITLE
. .dthleen Cahall 360-473-2315 Water Resources Manaaer
ADDRESS CITY STATE ZIP
3027 Olvmpus Drive Bremerton WA 98310
5) PROJECT ENGINEER PHONE NUMBER TITLE
City of Bremerton
ADDRESS CITY STATE ZIP
Same
6. How many services are presently connected to the system? 16,469 for 08200R
63 for 082734
7. Is the system expanding? (seeking to extend service area or increase number of approved 0 Yes 0
connections) No
8. If number of services is expected to increase, how many new connections are proposed in the Number of connections
next six years? is not known; however
approximately
4,500 ERUs for
08200R and
750 ERUs for 082734
are forecasted
9. It the system is private-for-profrt, is it regulated by the State UTC? NJA
10. Is the system located in a Critical Water Supply Service Area? 0 Yes 0 No
11. Is the system a customer of a wholesale water purveyor? 0 Yes 0 No
12. Will the system be pursuing additional water rights from the Sate Department of Ecology in the 0 Yes 0 No
next 10 years?
13. Is the system proposing a new intertie? 0 Yes 0 No
14. Do you have projects(s) currently under review by Department of Health? 0 Yes 0 No
15. Are you requesting distribution main project report and construction document submittal
exception, and if so, does the WSP contain standard construction specifications for distribution 0 Yes 0 No
mains?
Are you requesting distribution related project report and construction document submittal
exception, and if so, does the WSP contain distribution facilities design and construction 0 Yes 0 No
standards, induding internal engineering review procedures?
17. Have you sent copies of the draft WSP to adjacent purveyors and the County for their review and 0 Yes 0 No
comment?
If yes, list adjacent utilities/entities that have received a copy of the draft WSP:
City of Port Orchard, Erland Point Water Company, North Perry Avenue Water District, Puget
Sound Naval Shipyard, Silverdale Water District, and Sunnyslope Water District
18. Is this plan an:
o Initial Submittal
o Revised Submittal
Please enclose the following number of copies of the WSP:
2 copies for Department of Health Review
1 copy for Department of Ecology Review
3 Copies Mailed via UPS on July 24,2006 for Agency Review
2 Copies to be Mailed via UPS in January 2007 for Final
Cit of Bremerton Water 5 stem Plan Checklist
Chapter 1
Chllpter.2
Chapter 3
Cilapter4
....... ChapterS:
'. '~:,>:Chapteri;:' .
:ictla.roe!i7 .
. .Chap.t~r;8i
ChaJiteri9
. Chaptili;1 0
Content Description
DescriptionOfWllter' System
ONnership and Management
System History and Background
Inventcxy of Existing Facilities
Related Plans (e.g., CWSp, local land use plans)
Service Area and Characteristics
Agreement (signed in accordance with CWSP)
Map
Service Area Policies (Including SMA policy and conditions of seNice)
Basic"PlannliJ'g}[)3ta :':.", "",
Current Population. Number of Service Connections. and ERUs
Current Watef Use and Data Reporting
Current and Future Land Use
Future Population and Number of Service Connections and ERUs (6 and 20 years)
Future Water Use (Demand forecast for 6 and 20 years)
!sy~emAiili.J~I~::.i:::.' ..j
System Design Standards
Water Quality Analysis
System Inventory, Description and Analysis
Source
Treatment
Storage
[]slribution SystemlHydraulics
Summary of System Deficiencies
*Must Be
Submitted
(.,I)
Section
inWSP
(~ )
(,J)
(,J)
U)
(,J)
( )
(,J)
(,J)
(,J)
(,J)
(,J)
(,J)
(,J)
1.1
1.4
1.5
2.2
1.6.2
1.6.1
Figure 1-4
1.7
.-'-'-- , .
2.3 and 24
2.4
2.1.3
Tables 2-2, 2-4, 2-5,
and 2-6
Tables 2-4 and 2-6
.'," ,,'
, '~~~, ~
7.5
4
3 and 5
3
4
5.7 and 8.4
8
8.4.7 and Distribution
List Appendix
>' 'i~[ ,;r:_1~
(~)
(,J)
(,J)
(,J)
( )
(,J)
(,J)
(,J)
Analysis of Possible Improvement Projec1S
i, .:COnS!l1Y:~t1fQ:P,i:ogra6i;ana;sou~lOfSup'P1YAnaIYsis'
Conservation Program
Water Right Assessment
Source of Supply Analysis and evaluation of supply a~ematives
Water Supply Reliability Analysis With Water Shortage Response Plan
interties
s<iuf?~1W}itei::l?r9.1@iC:>.6' ich<ldi 6he'oiB8lh)
Wellhead Protection Program
Watershed Control Program
"J:,'dp~.:iiti,o.!.1!l!i1jj:M'iI!hielj'lIrr~~;~r99fiii1i'!.
Water System Management and Personnel
Operator Certification
Routine Operating Procedures. Preventive Maintenance and Record Keeping
Water Quality Sampling Procedunes (Compnehensive Monitoring Plan)
Coliform Monttoring Plan.
Emergency Response Program
Safely Procedunes
Cross-Gonnection Control Program
Service Reliability in accordance with WAC 246-290-420
Customer Complaint Program
Summary of 0 and M deficiencies
'.Dis.llifl@.QIllli~~Ji!i~:Q~Tgii'aQd',GQ!I~~!>ij'~tan(jaids'..
Standard Construction Specification for Distribution Mains
. Design and Construction Standards for distribution Related Projects and Internal Review
,\:, ';.~:-~Jm~tQ~:ffi:~m;.e!ggrllm:::J~f~~~~1M~f!ifl'XJl~j;E~'-~~:::.:- ;~/<~;~!t;(1~t:iT;'!":}H;!f~:;'~ j;: ';~:: "!~ ;~l ,,-'
Capilallmprovement Schedule (6 and 20 years)
Selection and Justification of Capital Improvements
: :; ~;~i6~~~@~i~tiffii~~;~~~~~~11~~!~~i}~t~~/;;~:)~\~~:k;:~';,~A~ _;:i;-\;;r, '--~-: ',~-'
Summary of past income and expenses
Balanced Operating Budget (1 year if >1,000 connections /6 year if < 1,000 connections)
Demonstration of revenue and cash flOW' stability to fund CIP and emergency improvements
Rate Structure that considers aftordability of rates and water conservation
Systems < 1,000 connections may do OOH Financial Viability Test to complete above reqs.
UTC Rnanclal Viability and Feasibility Test (for UTC negulated systems)
M'isc~ji~ni:9u~\D:oc;uni~~fi~~~:~,'::~P:{~;t_"~'i~~":\;~":.:~~:::k:j~'~~.ff.;?t[~,:;i.~{;':'o~' , ',. ": ~_;'O' ,.~ '
For COOim~;;itY'syst;;;s, iv1eei;;,g ;;j' the c,;~~r'ne';;' (<iaie ~nd de;;c~ptiOI1)
County/Adjacent Utility Correspondence
Documentation of Slate Environmental Policy Act (SEPA) Compliance
Agreements
Satellite Management ram
. ";\i!_ir,\~~li:::~ _f'
( )
4.4.7 and enclosed
6.1.2
6.2
4 and enclosed
separate document
(,J)
(,J)
(,J)
(,J)
( )
6.13
6.9
6.8
3.10
6.7
document
9
',', :-:;'~:-'o ',. ~~.):tiJ2:~'\';,;;:-i..'.~'
Scheduled Nov. '06
Appendix
Appendix
1.6.1
N/A
MUlll\...yal Water Law Water System Plan/Small Water System Management Prol>-- ...il General Approval Checklist
For each element, please identify where in your Water System Plan (WSP) or Small Water System Management Program (SWSMP)
submittal the requirements of the Municipal Water Law identified in the column labeled "Element" are addressed.
The" Application" column identifies the type of plan (WSP or SWSMP) and the size of system the element applies to.
Addressed
Application Element in plan in Documentation
sections Attached
indicated
,c' .:' > ",.'., " '" ",::""""?,, ':" , ;"
The water rights self-assessment you have included in your WSP and SWSMP must be complete and must
WSP and SWSMP adequately reflect your water right status. Please review your self-assessment for completeness, accuracy and
All size systems consistency with your water rights. Section 3 YES
If there are factors (i.e. supplemental, seasonal, etc.) to your water right that are not addressed in the self-
assessment format, provide additional statements on how those factors affect your self-assessment.
The system capacity analysis must incorporate the water right quantity parameters (QaQi) found in your water
WSP and SWSMP rights self-assessment. Identify the number of connections, population served, and/or Equivalent Residential Units Section 8.2 YES
All size systems (ERUs) that you are currently serving and identify your current instantaneous and annual water usage. Water use Section 3
demand should not exceed existing water right QaQi.
The system capacity analysis must incorporate the water right quantity parameters (QaQi) found in your water
WSP rights self-assessment. For a 6-year planning horizon, evaluate the number of connections, population served, Section 2 YES
All size systems and/or Equivalent Residential Units (ERUs) that you are planning on serving, utilizing historical water usage and
future population projections. Water usedemand projections should not exceed existing water right QaQi.
" , : ,''c'':<: ,':, ,. ....'
WSP and SWSMP Provide a map and description of the water system service area. The map must delineate your retail service area Figure 1-4
(existing and future) as well any other service area (existing and future) you wish to include in your water right YES
All size systems place of use. Provide clear differentiation between the two boundaries. Section 1.6
WSP and SWSMP Provide a copy of the,land use map(s) for jurisdictions served by your system. Figure 2-2 YES
All size svstems
,,' 'L ';"':''"'''', '/':',"". """: '";:,, C:-:',,\:, ""',,.,:'
New language has been added to RCW 70.119 A, which states, ".. .municipal water suppliers shall continue to meet Water Use No current
the existing conservation requirements of the department and shall continue to implement their current water
WSP and SWSMP conservation programs." Efficiency conservation
All size systems Describe what, if any, previous efforts will be discontinued. For discontinued efforts, identify why continuation of Plan is an efforts are
Appendix anticipated to be
these efforts would be ineffective or provide documentation that the discontinued program had a prescribed end discontinued
date or savings level.
WSP Must meet current conservation requirements. Please review the requirements (attached) and provide identification " "
All size systems of where in your current WSP each of the elements is included. YES
SWSMP Provide a completed Water Conservation Program (Element 14 of the SWSMP). N/A N/A
All size systems
Application
WSP
Systems serving
1000 or more
connections
WSP
Systems serving
1000 or more
connections
WSP
Systems with
inchoate water
rights serving 1000
or more
connections
WSP
Systems with
inchoate water
rights serving 1000
or more
connections
~R.e~cliiiji'~(t~V:I,at
WSP
Systems with
greater than I 000
connections
Element
Describe the projects, technologies, and other cost-effective measures that comprise your water conservation
program.
Describe the improvements in the efficiency of water system use resulting from implementation of your water
conservation program over the last six years.
Provide a demand forecast for the next 6-years based on the water savings expected from the planned conservation
measures.
Provide a demand forecast for the next 6-years based on the water savings expected if implementing additional
conservation measures that were considered cost-effective, including those that were not chosen to be implemented
at this time.
Exploring opportunities for water reclamation is an element of the Municipal Water Law that must be addressed in
this plan
Systems> 1000 Comiections must complete Attachment 9: Water Reclamation Checklist for Systems with 1,000
or more Connections or provide comparable documentation.
Table 2 in
the Water
Use
Efficiency
Plan
Table 2-4 in
the Water
System Plan
Documentation
Attached
Water Use
Efficiency Plan is
in the Appendix
YES
YES
See Reuse
Checklist
Bremerton is
currently
implementing all
planned
conservation
measures and
will be evaluating
additional
measures in
response to the
new upcoming
conservation
re ulations.
YES
Application
WSP
All size systems
WSP or SWSMP
All size systems
WSP or SWSMP
All size systems
In Watershed
Planning Process
per RCW 90.82
Element
Describe how your system responds to requests for new water service by providing:
1. The process for service requests, including timeframes
2. How you determine that your system's capacity is adequate to provide new water service (including
sufficient water rights)
3. Conditions of a non-technical nature that may affect your ability to provide new water service
(annexation procedures, water rights issues, local ordinances, etc.)
4. Your system's procedures for granting or requesting extensions of time during a water service related
project, and describe your procedure for handling disputes and appeals when water service requests
are denied
Consistency with applicable adopted local plans, regulations and policies must be determined prior to plan .
submittal. For each appropriate planning agency provide a completed "Consistency Statement Checklist" or
analogous documentation.
If your system is located in an area developing a watershed plan per RCW 90.82, describe your efforts to
coordinate with the local planning unit. We have attached a list of Water Resource Inventory Areas (WRIA)
where watershed plans are currently in development along with contact names for each area.
Documentation
Attached
Bremerton
Municipal Code
and related forms
attached to this
checklist
N/A
The City of
Bremerton was
an initiating
government and
an active
participant in the
WRIA 15
watershed
planning process
from 2000 until
the process was
halted by a veto
of the Squaxin
Island Tribe in
June 2005.
City of Bremerton 2005 Water System Plan
lter Reclamation Checklist for Systems with 1,000 or more Connections
,
The Municipal Water Supply - Efficiency Requirements Act, Chapter 5, Laws of2003 (Municipal Water
Law), amended Chapter 90.46 of the Revised Code of Washington (RCW) to require public water systems
serving 1000 or more connections to evaluate opportunities for reclaimed water when completing their
water system plans (WSP). This checklist may be used to ensure that your WSP includes sufficient
information about opportunities for reclaimed water and your system's efforts to develop those
opportunities.
Water System Name: City of Bremerton Main System and West 517 Pressure Zone
Date: July 2006
PWS ID: 08200R and 082734
1. An evaluation of water reclamation opportunities is found in the WSP on pages: 3-24
At a minimum, include the following in your evaluation of reclamation opportunities:
. An inventory of large water users.
. Identification of potential reclaimed water users.
. Estimates of how much water could be saved by development of reclaimed water projects
. Identification of opportunities that your system intends to pursue within the next six years
. A brief analysis ofthe financial and operation feasibility of identified opportunities
The form on the opposite side of this page is provided to assist you in conducting an inventory of
potential users and estimate savings. Use of this form is optional.
The City of Bremerton completed a "Water Reuse Feasibility Study" in 1998. A
copy of this document is enclosed. The City of Bremerton was involved in the
WRIA 15 watershed planning process which also evaluated reuse opportunities.
As an extension of the WRIA process, Bremerton was also involved in the "WISER
Water" (Wetland, Irrigation, Stream Enhancement, Recharge--water recycling)
project. A thorough evaluation of reuse opportunities at Kitsap County wastewater
treatment plants was conducted; however, Bremerton was not one of the top
candidates selected for further funding. A copy of the final documentation has
been requested and will be forwarded as soon as it is received.
Form From DOH March 2004 Revision
2. Provide the results of that evaluation.
Ifnew or additional reclaimed water opportunities are available, include a brief description
of activities you are considering undertaking or those activities you will undertake to pursue
development of those opportunities.
If reclaimed water opportunities are not available, include a brief description of the
interaction with the local wastewater facility (or other entity within the area you serve that
may be a generator of reclaimed water) to evaluate opportunities to develop reclaimed
water.
Please see enclosed reuse feasibility study. The reuse section of the City of
Bremerton Water System Plan states:
The City owns and operates a secondary wastewater treatment plant (WWTP) with an
average flow of about 6.2 MGD which could potentially be reclaimed after further
filtration. Water reuse is the beneficial use of reclaimed wastewater treatment plant
effluent in compliance with Washington Departments of Ecology and Health
regulations.
Bremerton's WWTP currently uses reclaimed secondary wastewater effluent for
process control, odor control, and to irrigate inside the WWTP grounds and at a
neighboring business. Approximately 150 gpm is used for in-plant uses and an
additional 120 gpm are used in the summer months for an annual total of 88 MG/year.
A "Water Reuse Feasibility Study" completed in 1998 identified the potential demands
for and costs to provide additional reclaimed water to potential users in the Bremerton
area. Bremerton's wastewater has higher than average saltwater from collection
system infiltration and Puget Sound Naval Shipyard inflow making reuse possibilities
challenging.
A 2005 County-wide reuse study indicated that Bremerton had the least potential for
large-scale reuse and recommended grant funding be focused at other locations with
more feasible reuse opportunities. The City is currently evaluating the next step to
take in reuse.
3. If evaluation of water reclamation is not included because such an evaluation has been
completed by the wastewater facility, or other entity, please include a copy of that
evaluation.
N/A see answers above
4. If water reclamation is mandated for this water system through local government agreement,
contract, local regulations, ordinances, or other mechanism, please provide a copy of the
governing mechanism.
N/A
Form From DOH March 2004 Revision
5. Ifreclaimed is available within the service area of your water system please include the
following information:
Name of Facility City of Bremerton Wastewater Treatment
Plant
Class of Water Received (A, B, C or D) C
Reclamation Permit Number N/A
Approximately 150 gpm is used for in-
Amount of Reclaimed Water received plant uses and an additional 120 gpm are
used in the summer months for an
annual total of 88 MG/year.
Bremerton's WWTP currently uses
A brief description of how this water is used, reclaimed secondary wastewater effluent
including information on cross connection for process control, odor control, and to
control irrigate inside the WWTP grounds and at
a neiQhborinQ business.
Date when your utility began receiving reclaimed 1987 (for in-plant use)
water
.~(),"-rna~: BIJlk!!S. and.!'llJ~~~f19_.
Form From DOH March 2004 Revision
.
/
lfl~ H;;~Tih
V;ldsu1ff "r CI,rilvllfm~,,'nl '1,"11111,
O.!Jin'iftJri,lIj".': \\'.u~'T
RETURN TO: Southwest Re ional Office PO Box 47823 01 m la WA 98504
~6~f,@I~f@~lYj:6:P.1~~i~~1s~~~~~~~;~~~~~i~~i1iji~~~l~ ~~fffQ:OuNFt~~~i~~~tz~y~~,fu?j~
BREMERTON, CITY OF KITSAP
WATER FACiliTIES INVENTORY (WFI) FORMU~~~:;~7I1912006
ONE FORM PER SYSTEM Printed: 1011812006
WFI Printed For. On-demand
Submission Reason:Annual Update
1~~RiiI~~t:l:'Qfft~s--.t~1r1\s;~~I8~g~i~g,[g~cfi~~:~f~TI~1~Wl~t"f3~l!~I1?:i1liIt~~J'R~~1~~j(~l[G:~~~MKs"~j~:WJI~~~w;I~;Nlfffit~E:OP_O_62~AK~~0
KATHLEEN M. CAHALL [MANAGER]
3027 OL YMPUS DR
BREMERTON, WA 98310
BREMERTON, CITY OF
KATHLEEN M. CAHALL
3027 OL YMPUS DR
BREMERTON, WA9B310
TITLE: MANAGER
fStREEtiAlJ"DRES-s'IRi:iitF.ERENt:'FR6M'ABOVE",'i7k:';'Iff2~'S';:-:~.iOjC::;;,2.s~j5j;f~+i f:STRffi;AOljRE'SsIE[rIFF.EROO7FR6;.r;AB6VE~Jtf~s@i;;:&0:~~J'''~;-'':4;"?'i'fYi";;'c'iti
ATTN ATTN
ADDRESS ADDRESS
cm STATE ZIP CITY STATE ZIP
t~;M~tl'9M&BXPMRX{,oN'I~gf{1Bfg8!MJ.JQ~.t~~~~w~~~~~j:1.1f~';RfiBl;f~}~,~J~ ftQii9iN~Jj;QgRi~fflt!f;9~nQ~t~~~~i~~}!t~~~~~~~r2ift.~~~iif~~i~
Primary Contact Daytime Phone: (360)473-2315 Owner Daytime Phone: (360) 473-2315
Primary Contact Mobile/Ceil Phone:
Primary Contact Evening Phonll: (360) 478-2847
EoJlIlIlI: kathleen:cahall@ci.bremerton.wa.us
Owner Mobile/Ceil Phone:
Owner Evening Phone:
(360) 478-2847
E-mail: kathleen.cahall@ci.bremerton.wa:us
S1;;1~~t~:rrg[~~~~<~~IffiG'ENCY.{tSMA~cii~~f@)Jjifi!ili!)~ili1~[~~~~~*~~i~~lt~~~I~~ii~;:~~~~4~t~01~'3!Iift~~~f~~~
i[ Not applfcable (Skip to #12)
o Owned and Managed
o Managed Only
DOwned Onl
~!Th~~~,~J.~~1f~
"';...~.=~=~_.~ .-
SMA NAME:
~.2}t:~A~~i~1:OCs@~i~lsjl.s~1~rt@'UJhsf~p.e.IY)tt~i~3Jf~~~~~~~~Tb~F1;:~fliij~~~~~1~j\tf~t~-!8~if:#1~J:~~~Al~f:I~~~~~i\%~~fi;~~~~~
OAgricullural l8( HospftaUCnnlc RResldenUal
lilCommerclal 1 Business l8( Industrial .chooJ
liloay Care l8( Licensed ResldenUal FaclBly OTemporary Farm Worker
~ood Servlce/Food Permit lil Lodging l8(Other (church, fire SIaUon, elc.):
01.000 or more pelSOn event for 2 or more days puryear i[ Recreallonall RV Park
~1~ilVl.~1~~!~[[~,pwN~itsHfel!!1~Crli;?niiEn!~1:'b%1t\~:W~)jIf,~~r~~#.~~~~J;~~~~~~mf!~~~{~rf~~-[~~ir~~i~~f li4li:~!~GEJ~fACITYdi!'1n~~~~
DAssocfallon 0 County 0 Investor 0 Special Dlslrict
lilcily I Town 0 Federal 0 Privata o State 32,030,000
... SEE NEXT PAGE FOR A COMPLETE LIST OF SOURCES --
DOH 331-011 (Rev. 06103)
Sentry DOH
Water System Copy
Page:
WATER FACiliTIES INVENTORY (WFI) FORM ~ Continued
k,~_.J!!3i~;NO~ ~1i~y~K@]:~~U~~~~Tfi0~4-~ib~i'$Ji~r~~~~~f)%~i~ ~~iicJ:li).NfitH~~~~::~~~~~~~~~]
~~,g0820mR .-= BREMERTON CITY OF KITSAP
.~'~-:-!-"'--:'.---'~'~--""'" ,
- " .. - - --- ::~l~Ef-1i';~ ll~_ - - :w12i~ ~~~~~t
~15~ ~i~~':'l11: ~ -~~j~v,:"c
U8CE' -::.:...:.:;::: JiERffj' L~~souliliE'tocA
'--~' --
i ,;::,":". ,~:-:-:; -
;:.~.:: ;.-~~;- ::1.;.-:' ~..;;c;
~ I:::~ ;-;'.1;:-,: 1,,'1;.::;; .-:-.:..!: II
i~ .~~:-..~ ~ :::>;; <;:..,:.:
Q:l- i=:- ....":':..; :'1:::": i:"-= =~-:
~, ;;::: ~":;':"1 fT:i' f~ ;-::..-:=.\ ~::?:.
1iil ~2.' ;!:! -;:U;; ::;z::, ~~.~~- i~ ffts.
;~'. :(!I !~ :;::,..,~ H5i
8 '::Z: :X;;:. 7;>"-;";' ::;~;:,";T.
a.:=;; :..~> ;n: ,(!I [Iii ~ ~~ ~#r
70""':::: r.-.;:.t; ;~w :,"".r."." ;0 ~~ ~ ;0 ~z
~g~ .:IL:" OF :z
[~ ;~ ;.::.o;J :;In !~ .,:;;:: ~ ;%. ,0 ;-:;"
i~ ;W 12!:: ~ffi f.i! ,2: ,0 ~ '0 ~ ra..~~
lU: 'W ~ ~.
~.oS~ C:c, ~ ;u 'z 16 !-w 'W, ~ Z:i2
~~~ -~U: ~;!; ,!!I' ft!) ;< ~~. j~ il!) ~o: ~ii! 'Pi' !~ I~I
~~ !::i -~ iZ :;'% ~ 3. :.:u;; =z j~ ',0:: )15: ,Ui ~.9 i~ I~ ::W:
;~irl iii!: ,n: ,0:: !~ ,,~ :::z: ;0: ~w ~5 ;:r -...-
-. .W "G;." ~~ ::'Q;" ~::>> ~i2' ;.)--: ~w ,.:1; '0. = i~i
.if~ -.- ..- ,~ :~ t;;:- :w :0 :(1) ,.., '0 ;:a.: ::(1) ;:W :a:t. ~:z:: '.u ~u; ::u.: - . ::C/)~ -
so:n UNION RIVER X X y X X 12500 SW NE 34 24N 01W
'SDZ WEST BRANCH UNION X X Y X X 4488 SW NE 34 24N 01W
$03: UNION RIVER, EAST BRANCH X X X X 0 NW SW 35 24N 01W
'SOIf ANDERSON CREEK X X Y X 2250 NW SE 33 24N 01E
505 GORST CREEK X X X 1795 SW NW 32 24N 01E
S06 WELL #1 No taa X X X 260 0 NW BE 33 24N 01E
SOl WELL #2 MB908 . X X y X 273 750 NW BE 33 24N 01E
~SOBi WELL #3 MB915 X X Y X 316 480 NW SE 33 24N 01E
's69: WELL tt4 MB924 X X X 401 0 NW SE 33 24N 01E
$111' WELL #5 MB925 X X X 550 0 NW BE 33 24N 01E
$11\ WELL #6 Nolao X X X 535 0 NW SE 33 24N 01E
S1~~ WELL #7 MB922 X X Y X 627 500 NE SW 33 24N 01E
@fli WELl #8 MB909 X X y X 578 550 SE NE 33 24N 01E
WELL#13 AAB902 X X Y X 273 510 NE SE 34 25N 01E
'816 WELL #14 MB903 X X Y X 278 180 NE SE 34 25N 01E
'816 WELL #9 AAB910 X X Y X 882 270 NE SE 22 25N 01E
\$1% WELL #17 MB914 X X Y X X 293 725 SE SE 36 24N 01W
;$t8: InAcl 12101/1995 WELL #16-GOLF COUR X X X 400 125 NE NW 01 23N 01E
:S19: InAct 0911212001 WELL#18-TWIN LKS R X X Y X 327 400 BE BE 35 24N 01W
'820 InAct 0911212001 WELL #15 AAB913 ZO X X Y X 294 150 SE SE 36 24N 01W
;~al InAct 09/1212001 WELL #19 ZONE 517 X X y X 182 300 SE SW 36 24N 01W
822 WELL #20 AAB920 X X y X X 260 1150 SE SE 35 24N 01W
'S2j WELL #21 AAB901 X X y X 380 500 NE SW 36 24N 01W
;824' 082734 J BREMERTON WEST ZONE 517 08273 4 X Y X 850 SE SW 36 24N 01W
DOH 33H)11 (Rev, 06103)
Sentry DOH
Water System Copy
Page:
2
WATER FACiliTIES INVENTORY (WFI) FORM - Continued
....~'~..~._...c"....~1 ~j~~~~~it~a~~~2~~~~~i~~~#:~~~t~~f/i~f~~ ~~~~;rr~~:i[fl~i~lli~t~1~2~ r~f~'--
i5-0srij~ilE\FAMfGY~RE~(D~.N~~$lm~WIri~~y[oiJ@;follo,~~g!~~;Yo~Ifi'a.V'e7)~~~'9~i~~~;g{li"i4~~jf{;t
A. FuU Time SlngIa Famlly ResldBllCes (Occupied 180 days or mete perysa!)
B. Part Time Single Family Residences (OccupIed less /han 180 days per year) 0
i6~MJm:TJ:fAMlj}'fgE~JRE:NT~~J:lftP.lNJ3..s.1iHp.w;m~y;P.fit!1iftQnctWJ:n.~{~oWp:JJih~~~jl~;~~~~~~;Jfi~~~J.~~;;:~jis:';_~~
A. Apar1ment BulJdIngs. condos, duple~es. barraclls, dorms 1884
B. FuD Time Residential Unils In llIa Aparlmenls, Condos, DlIJlIexas, Dorms ihat are 0tCUp1ed more than 180 days/year 9288
c. Pail Time ResldenllaJ UnlIs In lhe Apartmenls. Condos, Duplexes, Donns lIIal are occupied /Bss than 190 days/)'aar 0
21J"'N_Q~R;S!P!;NI!A~~QN~E:_CJIQN$J(Howma!iYi9n!ii!1fol!9.W!ti!i}i:l.fi1@,Ii~v~1)5~l%]~ii:;".i~~tf,j~~\~~~:~i;'J~-'i:~:f~~~:+~;~
A. Recreational Servltes [Campsllils. RV Sites. Splgols, ele.) 0
B. lnslllullonal. CommeltlaVBuslness. School. Day Cara.lndlJslrial5elVices. ele. 1407
i';:;;:~~JA;la~;:toTA&S~RVjCi:\CONNEGTiONS~i;;~,t~;I
. ".... ._____h . .__
~~~~?J~~ttt~5~~:~~~ ~~~.~{~~~~~~;~
)j:gif;'~~14pjh~~~:i{ ~f~;~Jf~~}}ii
~~(\~;jf;23.1ir~~~~?~t. BY::'"'?~~~2~~tI~
f~J;[ID!~g~JIM1;!R!;~JDE.mJi'~l>f:Y1iAtJQN~~~t~t.~ii~~i~~Jj~J{~:\~~~~i!t~
A; How many residents are served by this system 180 or more days per year?
Z~f11~~~!~~j-f.~f~~ffl~~f~~;~~1B~?J&t~~0:~~-:~~~~~
~ot~Ff~lUcti~gj-~ESlIilEtf(i~ur~gRQ~tT9i!~iE~;~ ffi:'fJNl.}~ j;;:~EEB~ ~T'~S EfAP.Rg t4rM'Y~ ~~lJ~E ,,,i'JuEi@ ~fi.ij~~ ~~~~ ~Q(IT~ ~.N9R~ ~DEC)f;
::,..__ ~..~""n" ~:-.-'f.l;'~.- ~r.;.;:-~~ -.--
A. How many part-Urne residents are present each month?
B. How marly days per month are they present?
..
, .fEMRbRARYJ&~nwisiE'NTclisERs-~~i1~f:;;~{';S~1Ej ~j!YA'f~ ':'~.~.".. -::;".., ~MAR:1~ ~~~1~ ~MAY1?:i fHJONg ~i2flllu~ ,.;;::~- -' ~;TSEP J'f ~[~~ E1~~~~ ~h~}-]
, ~~~~f.f ,,"'AUG~
."-'-~~~~-' -- - _.._...__._-_...-.-._~-,.-.. ,. ." ._~~...."- ';-.{:;:;'!:'i.?o"~:': ';E!i'::--;~':;:0-; 'S.;:~r:~ ::.t::.:=.::.-:;:'-::-.-: u..~_~..._-. ~=r:.:':r.:.r.:'
A. How marly lolal visitor.;. attendees, travelers, campers,
pallen Is or customers have access to the waler system
each month?
B. How many days per month Is waler accessible to the
public?
~ii~!i~&il~R1ijoN~~~sf.i5~'t~I(g~,Q:~~R~1~~~~~~~ ~;f;J,~;J E1[~~ t~~lr~ ~AP.R~5 \~,~~1~ ~{~_!lli~1 ~U~~1 ~@E,f~~ tJ~r~~ '-,,= QJ::J"~, ~!!9YZ:': ,"?-'DECiA
-..._:'. - .,,- ::,::;--::.';':l'.~.. E~E~i'_~
A. II you have schools. daycares. or businesses conooc1ed
to ~~urwaler system, hbw many students daycare
ch ren and/or employees are present each month?
B. How many days per month are they present?
o Update - Change 0 Update. No Change 0 Inactivate 0 Re-Activate 0 Name Change 0 New System 0 other
36. I certify that the Information stated on this WFI form Is correct to the best of my knowledge.
~IGNATURE: DATE:
.INT NAME:
TITLE:
DOH 331-011 (Rev. 06/03)
Sentry DOH
Water System Copy
Page:
3
/
/
fI~ &~Tth
Llii,.';nJln ft' Crrrinmmmrnl , k,JlJh
DjJia uf Orl.H/J.t IVolh'T
RETURN TO: Southwest Re lanai Office PO Box 47823 01 m la WA 98504
_'-~5Y5IEM:N'AME~~~~~~~~'!::f:-fitiff4'jf~}~~~~~~~;;ii~ i3~~cJ5JtNiti~1~~~~1.~~i[~~~
BREMERTON WEST 517 ZONE, CITY OF KITSAP
WATER FACiliTIES INVENTORY (WFI) FORMU~~~:;~7I19n006
ONE FORM PER SYSTEM Prinled:07/26n006
WFI Printed For: On-demand
SubmIssion Reason:AnnuaJ Update
i~~~MftijYE1~,fIT~ST{N'~M~~!~~1tl~G~gp~~~J~Ki~1f:ff:~1idE~;~~f0~'~[~~( i.zf;9~],~S'~i~:~~1iNG~~~i~1Dt;~~I[a1~~E:~'~Wile.iiOQOp23'f~:ilii
KATHLEEN M. CAHALL [MANAGER]
3027 OL YMPUS DR
BREMERTON, WA 98310
BREMERTON, CITY OF
KATHLEEN M. CAHALL
3027 OL YMPUS DR
BREMERTON, WA 98310
TITlE: MANAGER
FSrREET7ADDREssTF.tDiFFERENTlffioM]\BOVE;~E2&'-Eif*:~~~~~:~';j~{~?7.1s;~~ ;.siREErfJ'DDREsS:YF;i:JiFFEREN'nFR6;,,'Air6V81!~iiiiEfE~~ti\;E1Wb~f;j',-;;:::'SIa0~~
ATIN ATIN
ADDRESS 3010 MARINE DRIVE ADDRESS
CITY BREMERTON STATE WA ZIP 98312-2038 CITY STATE ZIP
~~Jf24:'HQ!!Blfi~~Y[C:()ttre;C~~E((R.fMT!g~~~~;t~~~~~~?~Lit,j~P!ttb1~(~;Zf"~fJ ~1:Q~iQWN:f~~Q.rf:(8~tUAF,()~IrQ.~fjL~~~~~i~f;!:~~~~~l~~~~fI~~~4~Ii~(~
Primary Contact DayUme Phone: (360) 473-2315 Owner DayUmePhane: (360) 473-2315
Primary Contact Mobile/Ceil Phone:
Primary Contact Evening Phone: (360) 478-2847
E.mall: kathleen.cahall@ci.bremerton.wa.us
Owner Mobile/Ceil Phone:
Owner EvenIng Phone:
(360) 478-2847
E-mail: kalhleen.cahall@cLbremerton.wa.us
~t!~SA~~MAN~~~tm~i[ENcw:SPM;(~k~wpJIfYk~~HJttf~~;;;:~;~~'!:I~~tf.;~>~~~~1~~~~}f1~~;;~7~~~~~~f,~fI;~!l~~J.F.~iij~1~
llI!II. Not applicable (Skip 10 #12)
o Owned and Managed SMA NAME: m~tt~3:~l~%jk~iI~l
o Managed Only
DOwned Onlv
~~iWki;E[{j~:Wb1ri.H~~~~I~"!C.~f{~Ai,;i;]lli[f~prily.}ii~!~~~&~i€~~~~f~~~~j'R~~~;J~,t{1f~~~~~~~%~~~~rill~fj~~~"j~}~~
DAgricuhural 0 Hospital/ClinIc .esldenlial
Iil:Commerclal/ BusIness iii: InduslIial DSchool
DOay Care 0 licensed ResldenUal Faclfity DTemporalY Fann Worker
.ood SeJVlcelFood Pennll 0 lodging lilOther (church, lire station, etc.):
D 1,000 or more person event for 2 or more days per year 0 Recreational/ RV Parll
~1~~W~.T.t:R~r~tEM~QWi.i.~R~~jP]{m~'~fl&:pn.e}~~~fI~'f,t~~r4~~~~~t1iKT0fill.~~!J&ifriilli?~~l3.i~:llif~~4~: ~t4!.~SICrf~f."GE~f~C~jfY~~iifnID~~~J
DAssoclaUon 0 Counly 0 Investor o Special DlsIrlcl
li{CIIy/Town 0 Federal 0 Prlvala o Stale
SD1I. 820 WEll #15 AAB913 SPLIT- 08200 X Y X 36 24N 01W
InAct 09/12/2001 S19 WELL #18 MB921 X y X 35 24N 01W
SU;f S21 WEll #19 MB919 SPLIT - 08200 X Y X 36 24N 01W
S04~ 08200R 1 BREMERTON 08200 R X Y X 36 24N 01W
S051 WELL18RAEC924 REPLACED 802 X X Y X 164 35 24N 01W
DOH 331-011 (Rev. 06/03) Sentry DOH Water System Copy Page: 1
WATER FACiliTIES INVENTORY (WFI) FORM - Continued
--. - gr2~~siSTE.M~~~~i~~f~1H~:it~~i:i~li~~~~~~~ ~~sfoutii;f;Ii~~~~~~~~Jlit~i:=S"2S
BREMERTON WEST 517 ZONE, CITY OF KITSAP
i5;~sIN~~~fM1fi;"'(fR~&rQ~N_qE$I(f!Ow:m.lID'fofffi~f~]i~~ri'!i[i1~VQ~;_~:a;v~1};~;f~~_~~~'~~~;i-:;,~'~i~:;:g~~;Ii(
A. Fun IIlIHI SiIIgla FamUy Residences (Occupied 180 days Dr I1lIl/li!peI yearl
B. Part lima Slnglll Family Resldellt8S (OccupIed less /h8nl80 days per year} 0
~~~M@'ti4fAMi~YiRE.:siJ:)EN.J~~8PI~PINi3_st(Howjli~ntQHh~fPlh~Wiljgti!o;y'~IJ~If~v~ll[f:'\\=%f!~BK~;t:s~;~~;~E'~~H~;;;;~~~f~}.l
A. Apartmenl BuUdlngs, condos, duplexes, barracks. dorms 0
B. Fun T1me ResldenUaI Units In ilia Apartments, Condos, DupIexa5, llorms ilia! are oa:upled /IlOIB than laD daysJyear 0
c. Part Tlma Res1danllal Units In the Apar1m5llts, Condos. DuplllJ(es. Dorms thai ilI1lllCClfll1ed lass /h8n IBD dayslyear 0
~7~NQN~RESJpENt~i;.cQffNg~J1Q~~{BowJTI@!JiQH!!.ejti!n{jM!1gT!!OlY~~1b:a.v~1)~f;~f:~t:F~~~~~~:Sc",~~L.~~-B~i~ff.'~
A. ReclB!lllonal SeJV1ces (Campslles, RV Sites, Spigots. etc.} 0
B. lnstilu11onal, CommerclallBuslness, Scliool, Day cae, Induslrlal SeJV1ces, elc. 61
2~1~t~~o~~~~ ~~~~~;;i1~
~~=f~.6~~!f!jb~ ~~i~~~~~~~l~
f'i);;I;~~~:~8~totAt"SERVfCErct5NNECTI(fNSE;;:;'{;~;k
,f:7_~:~Ii63gj,,:-':~ili'
~t[iilJ.illitrJME~Re$)RJ~NTIAfrrliQB9c@;I'O~~~it0~~~,zfl~~~r1i8I;t~"B(~j1f.~Thl~'f~i.~i~Xt.~e!b~1y.Il~~~~:ifz1f0lif~{1~%~rt~~i{~~ffiqt0iffii~Z~
A. Hew many resldenls are selVed by this system 180 Dr more days peryear7 . . 5
;firi:fP-ART;iiME;RESIDENI1A~I!OP-UE6.TIOPt:~i'~'; ~i.!-',IAN~'2 ~';EE~g ~MAl!~ ;;:=.gB~ .~~~r~ ~~'@~ s;,~uG;c;; =~_AUG,,;o :;:. "l. ~o.CT.-ii~ ?t~OV@ :;'.,;DEC~;;
.",;,SEP..<:~
E . ..-.::;. _ ''';.: ;. :: .. -;...::.... ~.:;_ '."_;,.~ .:..!:::p':::;:Z~f~1 -~" .".-.. .,,-~ ....--. . ..
A. How parHlme residents ere present each month? .
many
B. How many days per month are they present?
}r;Ml@,MR~~rr~N~I~Ju.sERS'i@.fu"'2~~Ji ~~~~~ ~@!l~ .... ~. ~.::"~O:: ~~~,~; ~~y~ WI~ilJ~~ t'fc:JuiIfg; tfAUGi'ili ~t~gft~ i-~OCJg; ~NoVb:~
~~~!~~ ;t"'.DEC;;;;~
~:~~";-";J"'7":"'=:':: ~~"~.IE
A- How many tolal vlstlors, attendees, travelers, campers,
paUenls or customers have access to !he water system
each month?
B. How many days per month Is water accesslbla to the
publIc?
~~B~~!J~R\~QN;~SlDi;NttJigQ~ER~~g:;M~~~~~ ". ... -~.. .'~ ~...:~-...,.:r.-',,; ._':>'........-;:.1;:"";::: ~~~ ~@~~~~ g.~WIii~ ......_;:....--::.;T..' "'.~~.-_::.:-=;::.. go'~ .-.=v=
?Jl_ECj~
"",,'JAtj "," f~.~':~ 'i!,MAR;Ii,~ ~,~~,E~ :3f,AUG "" ~(!;!L-~ \f~-'t9:gs
':;:':.~2'~,;,; =~~..- -'-.-r:.,.,,-=''':-
A- If you have schools. daycares, or busInesses connected 400 400 400 400 400 400 400 400 400 400 400 400
~~8ur water system, hOw many students daycare
I ren and/or emplOyees are presenl each month?
B. How many days per month are they present? 22 22 22 22 22 22 22 22 22 22 22 22
o Update. Change 0 Update. No Change 0 Inactivate 0 R~Activate 0 Name Change 0 New System 0 Other
36. I certify that the information stated on this WFI form 15 correct to the best of my knowledge.
SIGNATURE: DATE:
I
.lNT NAME:
TITLE:
DOH 331-011 (Rev. 06/03)
Senliy DOH
Water System Copy
Page:
2
City of Bremerton
Department of Public Works & Utilities
3027 Olympus Drive
Bremerton, WA 98310-4799
www.ci.bremerton.wa.us
." .
.. . Printed on recycled paper
~.+i
(
'- ,'f~;,,'__ ,,'..d .~-r: ~_ f~~~><~~.:~:~"->~rLi~~i\~ :,;
Forbillinginf~rmatibncall4 73,-5:3'16.
'Fcirfl'hshing 'I nstr6dions'ca"u oLi r
Water Hotline at473-549Q.
Visit the City's website at.
www.ci.bremerton.wa.us
Drinking Water
Quality Report
2005
Celebrate National Drinking Water Week
May 1 - 7,2005
Call 473-5920 for more information.
Bremerton Drinking Water Quality is Excellent
The City of Bremerton Water Utility is pleased to provide you with its annual water quality report and
proud that your water continues to be of the highest quality. The City is committed to safeguarding its
surface and groundwater sources. This brochure summarizes the test results for water provided to
over 50,000 customers last year and is a record reflecting the commitment of Water Utility employees
to deliver you excellent quality water. Included are details about:
. where your water comes from,
. what it contains, and
. how it compares to standards set by regulatory agencies.
Safe drinking water is essential for our citizens who need to be well-informed to wisely utilize and conserve water
resources and to support the improvements necessary to maintain the highest quality drinking water possible.
Protecting Our Water Supplies
Surface water from the Union River All.
Reservoir and groundwater from . I .
production wells located in the Bremerton N
area provide the supply for Bremerton's
water. All sources are managed in
accordance with Washington State Department of
Health and Federal Environmental Protection Agency (EPA)
regulations and best management practices for water supply
systems. Bremerton owns and protects the 3,000 acre
watershed surrounding the Union River supply. Access
to the watershed is secured, patrolled, and limited to
water supply and forestry management activities.
Each year the Washington State Department of
Health inspects the surface supply. Groundwater
wells are also safeguarded through efforts to
protect critical areas around the wellheads. All
waterfacilities are monitored and patrolled.
1~1 BremellOll Water Service Area
-...;. Roads
Bremerton Water Needs Minimal Treatment
Bremerton's water system is operated and maintained by experienced personnel and certified by the
State. The Washington State Department of Health determined Bremerton's Union River water source to
be of such good quality that the City is not required to install a filtration facility as long as all water quality,
operational, and watershed protection requirements are met. Bremerton consistently meets these quality stan-
dards. Treatment of Bremerton's water currently consists of chlorine to control microbes that might be present in the water
and sodium hydroxide for corrosion control. Corrosion treatment is required to prevent Bremerton's water from
leaching lead from customer's household plumbing. Sampling results confirm this treatment is successful in achieving
corrosion control.
The City of Bremerton performs systematic flushing of the water distribution system. Customers are notified about fluship'"
through newspaper ads and neighborhood signs. Flushing is a process of sending a rapid flow of water through the mail
"-.
to clean them. This helps to maintain water quality by removing sediment. Flushing may cause a temporary discoloration
to your water. While this discoloration is unpleasant, it is not harmful. If this happens, wait thirty to sixty minutes. Then turn
on your cold water and let it run for one to two minutes. If your water does not clear up after this process, please call the
Customer Response Line at 473-5920.
Information From EPA
Sources of drinking water (both tap and bottled water) include rivers,
reservoirs, springs, and wells. As water travels over the surface of the land
or through the ground, it dissolves naturally-occurring minerals and, in some
cases, radioactive materials and can pick up substances resulting from the
presence of animal or human activity. Contaminants that may be present in
source water are microbes, pesticides, herbicides, organic and inorganic chemicals, and
radioactive materials. To ensure tap water is safe to drink, the Environmental Protection
Agency (EPA) prescribes regulations limiting the amount of certain contaminants in water
provided by public water systems.
Drinking water, including bottled water, may reasOnably be expected to cOntain at least small amounts
of some contaminants. The presence of contaminants does not necessarily indicate that water poses a
health risk. More information about contaminants and potential health effects can be obtained by calling the
EPA's Safe Drinking Water Hotline at 1-800-426-4791.
Some people may be more vulnerable to contaminants in drinking water than the general population.
Immuno-compromised persons, such as those undergoing chemotherapy, persons who have undergone
organ transplants, people with HIV/AIDS or other immune system disorders, some elderly, and infants, can
be particularly at risk from infections. These people should seek advice about drinking water from their health
care providers. EPA guidelines on appropriate means to lessen risk of infection by Cryptosporidium and other
microbial contaminants are available from the Safe Drinking Water Hotline at 1-800-426-4791. Please note that
Bremerton has tested for Cryptosporidium since 1994 and has never detected this organism in the water source.
/ '
(
"
Bremerton Water is a Great Value
Your water rates pay for delivering high-quality water to your tap and keeping the water system in top con-
dition. Bremerton customers pay water rates among the lowest in Washington State.
Ho~ to Use Water Wisely
Bremerton's water supplies are dependent on rainfall to fill the reservoir and feed underground aquifers. Wise water
use is always recommended, and your conservation efforts are important. Improve your home's water efficiency - use
water wisely to save money and this remarkable resource.
Typical Household Indoor Water Use
Dishwasher
3%
Tackle the biggest water guzzlers first!
. Install low flow toilets.
. Consider purchasing a water/energy efficient clothes washer.
. Repair leaky toilets and faucets.
. Use water-saving habits such as washing full loads only. Turn off the
faucet when you shave or brush your teeth, and take shorter showers.
. Install low flow showerheads.
Toilet
leaks
5%
Showers
21%
Nearly one-third of the water demand in the summer is for irrigation.
. Water late in the evening or early in the morning.
. Consider drought tolerant plants or native plants in your landscape.
Use soaker hoses or install drip irrigation.
. Repair broken irrigation system sprinkler heads.
I
\ . Water lawns no more than 1 inch per week using a shallow can to measure.
. Install a rainwater collection barrel.
For information about water conservation, visit www.ci.bremerton.wa.us or call 473-5920.
Visit our water conservation demonstration garden and rain barrel at 3027 Olympus Drive.
~:~
y~
,'.'
Turbidity
pH
Total coliform
Disinfection by-products
Frequincy'
Continuous monitoring
Continuous monitoring
Continuous monitoring
Weekly
Quarterly
Inorganic chemicals
Volatile organic compounds
Radionuclides
F ~e qti~i1'c y'
Twice a year
Annually
Annually
Every 3 years
EX.ery 4 years
Presence of coliform
in less than 5% of 2.7% o - 2.7% 0 Yes
monthly samples
By-product of
80 ppb 39.6 ppb average 11.9 - 72.6 ppb N/A drinking water Yes
chlorination
By-product of
60 ppb 24.5 ppb average 0- 39.1 ppb N/A drinking water Yes
chlorination
4 ppm 0.79 ppm 0.62 - 1.00 ppm 4ppm Yes
PPlnis parts per'million (equivalent to olle pennyin $10,000).
, ppb is parts per billion (equivalent to one penny in $10,000,000).
, Action level is the concentration of contaminant that, if exceeded, triggers treatment or other requirements a water
system must follow. Ninety percent (90%) of all samples must be below this amount.
MClG (Maximum Contaminant level Goal) is the level of a contaminant in drinking water below which no known or
expected risk to health exists. MCLGs allow for a margin of safety.
MCl (Maximum Cbntaminant level) is the highest level of a contaminant that is allowed in drinking water. MCLs are set
as close to the MCLGs as feasible using the best available treatment technology.
N/A means not applicable.
NTU (Nephelometric Turbidity Unit) is the measurement of water clarity. Monitoring turbidity is a good indicator of water
quality.
Treatment Technique is a required process intended to reduce the level of a contaminant. Bremerton's surface supply is
shut off when turbidity increases above set points.
City of Bremerton
Department of Public Works and Utilities
DETERMINATION OF NONSIGNIFICANCE
PROPOSAL:
City of Bremerton 2005 Water System Plan Update - Review of water
records, population projections, water service area boundaries, and
construction standards. A hydraulic analysis of the water system and' an
evaluation of ~e water quality, recommendations for system and operational
improvements, such as adding, repairing, or replacing transmission and
distribution mains, storage reservoirs, pump stations, and other componerrL5.
PROPONENT:
City of Bremerton Department of Public Works and Utilities
LEAD AGENCY:
City of Bremerton Department of Public Works and Utilities
The water plan encompasses the City of Bremerton and unincorporated
areas surrounding the City limits. Townships 23,24,25 North, R 1E and 1W,
W.M. in Kitsap County,
The lead agency for this proposal has determined that it does not have a probable significant adverse
impact on the environment An environmental impact statement (EIS) is not required under RCW
43.21 C.030(2)(c). This decision was made after review of a completed environmental checklist and
other information on file with the .Iead agency. This information is available to the public on request.
LOCATION:
This Determination of Non-significance (DNS) is Issued pursuant to WAC 197-11-340(2). The lead
agency will not act on this proposal for 14 days from the Date of Issuance below.
RESPONSIBLE OFFICIAL:
Phil Williams. Director
Department of Public Works and Utilities
City of Bremerton
3027 Olympus Drive
Bremerton, WA 98310
5T AFF CONTACT:
DATE OF ISSUE:
COMMENT DEADLINE:
a;~
Phil Williams. ResponsibleOfficial
Kathleen Cahall. (360) 473-2315
July 28, 2006
July 11 J 2006
July 21 J 2006
NOTE: Pursuant to RCW 4321 C.075 and City of 8remerton environmental regulations (BMC
Chapter 20.04.200{e), decisions of the Responsible Official may be appealed. Appeals must be filed
with the appropriate fees at the Department of Community Development located at 345 Sixth Street,
Bremerton. Washington 98337. Appeals must be filed by the date indicated above as "Appeal
Deadline." If you appeal, you should be prepared to make specific factual objections.
NOTE: The issuance of this DNS does not constitute project approval. The applicant must comply
with all other applicable requirements of the City of Bremertan and the Slale of Washington.
SEP A CHECKLIST
A. Background
1. Name of proposed project, if applicable:
2005 City of Bremerton Water System Plan Update
2. Name of applicant:
City of Bremerton Department of Public Works and Utilities
3. Address and phone number of applicant and contact person:
Kathleen Cahall
Water Resources Manager
Public Works and Utilities
3027 Olympus Drive
Bremerton, WA 98310
360-473-2315
4. Date checklist prepared:
July 19, 2006
5. Agency requesting checklist:
City of Bremerton, Department of Public Works and Utilities
6. Proposed timing or schedule (including phasing, if applicable):
The Water System Plan (WSP) evaluates the existing water system and projects
future needs to the year 2024. This plan is required to be updated every six years.
The final WSP will be submitted to the Washington State Department of Health in
December 2006.
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain.
This document is such a plan and outlines proposed water transmission and
distribution extensions and improvements, pressure zones, reservoirs, and pump
stations.
8. List any environmental information you know about that has been prepared, or will be prepared,
directly related to this proposal.
Page 1 of 15
SEPA Checklist
2005 Bremerton Water System Plan
This non-project SEPA checklist has been completed for general impacts
associated with this plan. Subsequent specific construction projects to implement
the plan will be subject to specific environmental review as required under the State
Environmental Policy Act. The City of Bremerton and Kitsap County
Comprehensive Plan and the Kitsap County Coordinated Water System Plan also
relate to this Water System Plan.
9. Do you know whether applications are pending for governmental approvals of other proposals
directly affecting the property covered by your proposal? If yes, explain.
Zoning and development changes within and adjacent to Bremerton's water service
area can affect this plan.
10. List any government approvals or permits that will be needed for your proposal, ifknown.
Water System Plan approval - Washington State Department of Health
Water System Plan adoption - Bremertori City. Council
11. Give brief, complete description of your proposal, including the proposed uses and the size of
the project and site. There are several questions later in this checklist that ask you to describe
certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead
agencies may modify this form to include. additional specific information on project description.)
The City of Bremerton 2005 Water System Plan Update includes a review of water
records, population projections, water service area boundaries, and construction
standards. A hydraulic analysis of the water system and an evaluation of the water
quality are also included in the plan, along with recommendations for system and
operational improvements. Recommended improvements generally consist of
adding, repairing, or replacing transmission and distribution mains, storage
reservoirs, pump stations, and other system components, as listed in Section 9 of
the plan.
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range, ifknown. If a proposal would occur over a range of area, provide the range or boundaries of
the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not required to
duplicate maps or detailed plans submitted with any permit applications related to this checklist.
The water plan encompasses the City of Bremerton and unincorporated areas
surrounding the City limits. The planning area is located in Townships 23, 24, and
25 north, Ranges 1 east and 1 west, W.M. in Kitsap County, WA. The water service
area boundary is shown in Section 1 of the plan.
Page 2 of 15
SEPA Checklist
2005 Bremerton Water System Plan
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other
vanes:
Low rolling hills and inlets ranging from sea level to 700 feet in elevation.
b. What is the steepest slope on the site (approximate percent slope)?
Unknown, slope of area varies.
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If
you know the classification of agricultural soils, specify them and note any prime farmland.
The soil types vary throughout the approximate 13,800 acre water service area.
d. Are there surface indications ot history of unstable soils in the immediate vicinity? If so,
describe.
N/A
e. Describe the purpose, type, and approximate quantities of any filling or grading proposed.
Indicate source of fill.
Although exact locations and quantities of fill are not known, some grading and
filling would occur during pipeline replacement and other proposed construction
projects.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
Some minor erosion may occur during a pipeline replacement and other
construction projects.
g. About what percent of the site will be covered with impervious surfaces after proj ect
construction (for example, asphalt or buildings)?
None, during pipeline replacement and other construction projects the existing
surface will be replaced with the same material.
Page 3 of 15
SEPA Checklist
2005 Bremerton Water System Plan
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
Best management practices for erosion control will be used, such as hydroseeding,
filter fabric fences, and other techniques will be used to control potential erosion
during construction of recommended improvements.
2. Air
a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors,
industrial wood smoke) during construction and when the project is completed? If any, generally
describe and give approximate quantities if known.
Dust and some vehicle emissions will be generated during construction of
recommended improvements.
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe.
No
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
Construction dust can be controlled by watering disturbed areas.
3. Water
a. Surface:
1) Is there any surface water body on or in the immediate vicinity of the site (including year-round
and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names.
If appropriate, state what stream or river it flows into.
Within the Bremerton water service area, marine waters include: Dyes Inlet, Port
Washington Narrows, Chico Bay, Ostrich Bay, Oyster Bay, Mud Bay, Phinney Bay,
and Sinclair Inlet. Fresh waters include: Kitsap Lake, Alexander Lake, Heins Lake,
Jarstad Lake, Union River, Heins Creek, Anderson Creek, Gorst Creek, and several
other smaller creeks and ponds;
2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters?
If yes, please describe and attach available plans.
Page 4 of 15
SEPA Checklist
2005 Bremerton Water System Plan
Although the majority of construction would be within urbanized areas, the 36"
transmission main replacement from McKenna Falls will cross Gorst Creek.
3) Estimate the amount offill and dredge material that would be placed in or removed from surface
water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill
material.
Transmission main alignments to backfill trenches will avoid wetlands. If wetlands
cannot be avoided, design and mitigation will be on a case-by-case basis.
4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities ifknown.
There are no new surface water withdrawals outside of existing City water rights
planned as described in Section 3 of the Water System Plan.
5) Does the proposal lie within a 1 OO-yearfloodplain? If so, note location on the site plan.
Portions of the planning area along Heins Creek, Gorst Creek, and Anderson Creek
are within the 1 OO-year floodplain.
6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe
the type of waste and anticipated volume of discharge.
No
b. Ground:
1) Will ground water be withdrawn, or will water be discharged to ground water? Give general
description, purpose, and approximate quantities ifknown.
Ground water well improvement is included in this plan and applications for Well 9,
Well 21, and Well 22 have been submitted the Department of Ecology. Well 9 is
proposed to be improved to increase capacity. Other areas will be explored to
locate new groundwater wells. . .
2) Describe waste material that will be discharged into the ground from septic tanks or other
sources, if any (for example: Domestic sewage; industrial, containing the following chemicals . . . ;
agricultural; etc.). Describethe general size of the system, the number of such systems, the number
of houses to be served (if applicable), or the number of animals or humans the system(s) are
expected to serve.
None are anticipated.
Page 5 of 15
SEPA Checklist
2005 Bremerton Water System Plan
c. Water runoff (including stormwater):
I) Describe the source of runoff (including storm water) and method of collection and disposal, if
any (include quantities, if known). Where will this water flow? Will this water flow into other
waters? If so, describe.
N/A
2) Could waste materials enter ground or surface waters? If so, generally describe.
No
d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any:
N/A
4. Plants
a. Check or circle types of vegetation found on the site:
l deciduous tree: alder, maple, aspen, other
l evergreen tree: fir, cedar, pine, other
X shrubs
l grass
l pasture
crop or gram
l wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other
l water plants: water lily, eelgrass, milfoil, other
X other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
Small amounts of vegetation would be disturbed during construction projects.
Construction will generally be within urbanized areas so vegetation alteration and
removal will be minimal.
. . .
c. List threatened or endangered species known to be on or near the site.
None known.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation
on the site, if any:
None proposed.
Page 6 of 15
SEPA Checklist
2005 Bremerton Water System Plan
5. Animals
a. Circle any birds and animals which have been observed on or near the site or are known to be on
or near the site:
Answers are underlined vice strike out.
birds:
mammals:
fish:
hawk, heron, eagle, songbirds, other:
deer, bear, elk, beaver, other:
ba55, salmon, trout, herring, shellfish, other:
b. List any threatened or endangered species known to be on or near the site.
Summer chum on the Union River and Puget Sound chinook. McKenna falls serves
as a natural barrier to anadromous fish migration. Several Bald Eagle sites nesting
sites are documented in the City. Impacts to these and other endangered and
threatened species would be evaluated at the project level.
c. Is the site part of a migration route? If so, explain.
Not known.
d. Proposed measures to preserve or enhance wildlife, if any:
Watershed control activities in the Union River watershed also preserve wildlife.
6. Energy and natural resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the
completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc.
The City of Bremerton currently uses diesel or electric energy to run its pump
stations, treatment facilities, and automatic controls.
b. Would your project affect the potential use of solar energy by adjacent properties? If so,
generally describe.
No
c. What kinds of energy conservation features are included in the plans of this proposal? List other
proposed measures to reduce or control energy impacts, if any:
Page 7 of 15
SEPA Checklist
2005 Bremerton Water System Plan
A water conservation plan is included in this plan. Reduction in water usage by
Bremerton's water customers will decrease the amount of energy needed to pump
and treat both water and the resulting wastewater.
7. Environmental health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire
and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so,
describe.
Chlorine is used in the treatment process in accordance with the City's Risk
Management Plan for Chlorine. Methods of transporting and handling chlorine is
included as part of the operations program in the plan.
I) Describe special emergency services that might be required.
An emergency response program is included in the operations program in the plan.
2) Proposed measures to reduce or control environmental health hazards, if any:
Replacement of deteriorating and undersized pipelines and adding emergency
operation components will increase the systems public safety value and reduce risk
of public health hazards. A wellhead protection program is described in the plan to
protect groundwater sources. A watershed control program will protect surface
water sources.
b. Noise
1) What types of noise exist in the area which may affect your project (for example: traffic,
equipment, operation, other)?
None
2) What types and levels of noise would be created by or associated with the project on a short-
term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours
noise would corne from the site.
Short-term minor construction-related noise would occur during the day during
construction hours;
3) Proposed measures to reduce or control noise impacts, if any:
None needed.
Page 8 of 15
SEPA Checklist
2005 Bremerton Water System Plan
8. Land and Shoreline use
a. What is the current use of the site and adjacent properties?
Land use within the planning area includes residential, commercial, light industrial,
and the Puget Sound Naval Shipyard.
b. Has the site been used for agriculture? If so, describe.
Areas within the planning area used for agriculture is very minimal. Recommended
construction projects are primarily within urban areas.
c. Describe any structures on the site.
N/A
d. Will any structures be demolished? If so, what?
None are planned.
e. What is the current zoning classification of the site?
Recommended construction projects will generally be within existing public right-
of-ways.
f. What is the current comprehensive plan designation of the site?
Recommended construction projects will be within several designations, but
primarily within commercial/urban designations.
g. If applicable, what is the current shoreline master program designation of the site?
N/A
h. Has any part ofthe site been classified as an "environmentally sensitive" area? If so, specify.
Impacts to areas identified as critical or sensitive areas - such as streams,
wetlands, and wellhead protection areas - will be evaluated at the project level.
i. Approximately how many people would reside or work in the completed project?
Approximately 56,000 people are served by the Bremerton water system.
j. Approximately how many people would the completed project displace?
None
Page 9 of 15
SEPA Checklist
2005 Bremerton Water System Plan
k. Proposed measures to avoid or reduce displacement impacts, if any:
None needed.
1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and
plans, if any:
Implementation of plan recommendations would be subject to local planning review
for compliance with land use compatibility. Population projections are consistent
with the Growth Management Act planning.
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or
low-income housing.
None
b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or
low-income housing.
None
c. Proposed measures to reduce or control housing impacts, if any:
None needed.
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is the
principal exterior building material(s) proposed?
The tallest structures proposed in the Water System Plan are reservoirs which
would be approximately 20 feet tall.
b. What views in the immediate vicinity would be altered or obstructed?
None-reservoir cOnstruction would be on Water Utility-oWned land.
c. Proposed measures to reduce or control aesthetic impacts, if any:
None needed.
Page 10 of 15
SEPA Checklist
2005 Bremerton Water System Plan
11. Light and glare
a. What type of light or glare will the proposal produce? What time of day would it mainly occur?
None
b. Could light or glare from the finished project be a safety hazard or interfere with views?
No
c. What existing off-site sources oflight or glare may affect your proposal?
None
d. Proposed measures to reduce or control light and glare impacts, if any:
None needed.
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity?
The planning area contains a large variety of recreational facilities and
opportunities, such as parks, bays, and lakes.
b. Would the proposed project displace any existing recreational uses? If so, describe.
No
c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities
to be provided by the project or applicant, if any:
None needed.
13. Historic and cultural preservation
a. Are there any places or objects listed on, or proposed for, national, state, or local preservation
registers known to be on or next to the site? If so, generally describe.
No
b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural
importance known to be on or next to the site.
None known at this time.
Page 11 of 15
SEPA Checklist
2005 Bremerton Water System Plan
c. Proposed measures to reduce or control impacts, if any:
Such areas would be avoided or impacts mitigated if unavoidable.
14. Transportation
a. Identify public streets and highways serving the site, and describe proposed access to the existing
street system. Show on site plans, if any.
Within the water service area are State Highways 3, 16, 303, 304, and 310, and
numerous local and arterial streets.
b. Is site currently served by public transit? If not, what is the approximate distance to the nearest
transit stop?
The water service area is served by Kitsap Transit and Washington State Ferries.
c. How many parking spaces would the completed project have? How many would the project
eliminate?
N/A
d. Will the proposal require any new roads or streets, or improvements to existing roads or streets,
not including driveways? If so, generally describe (indicate whether public or private).
New or replacement water lines will require restoration of any streets affected.
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so,
generally describe.
No
f. How many vehicular trips per day would be generated by the completed project? Ifknown,
indicate when peak volumes would occur. .
N/A
g. Proposed measures to reduce or control transportation impacts, if any:
None needed.
15. Public services
Page 12 of 15
SEPA Checklist
2005 Bremerton Water System Plan
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, health care, schools, other)? If so, generally describe.
No
b. Proposed measures to reduce or control direct impacts on public services, if any.
The water plan includes many recommendations that will improve public services.
Emergency water supply features and pipeline replacements will help ensure
adequate and responsive service of domestic water and fire protection.
16. Utilities
a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service,
telephone, sanitary sewer, septic system, other.
All listed services are generally available within the water service area.
Approximately 80% of Bremerton water customers are on sewer with the remaining
20% relying on septic systems.
b. Describe the utilities that are proposed for the project, the utility providing the service, and the
general construction activities on the site or in the immediate vicinity which might be needed.
N/A
C. Signature
The above answers are true and complete to the best of my knowledge. I understand that the lead
agency is relying on them to make its decision.
Signature:
Date Submitted:
Page 13 of 15
SEPA Checklist
2005 Bremerton Water System Plan
D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(do not use this sheet for project actions)
Because these questions are very general, it may be helpful to read them in conjunction with the list
of the elements of the environment.
When answering these questions, be aware of the extent the proposal, or the types of activities
likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than
if the proposal were not implemented. Respond briefly and in general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air; production,
storage, or release of toxic or hazardous substances; or production of noise?
If population increases as forecasted in the Water System Plan there will be an
increase in water use and in discharge of wastewater and septic systems. None of
the other items listed will be affected.
Proposed measures to avoid or reduce such increases are:
Included in the Water System Plan is a comprehensive water conservation program
to encourage per capita reduction in water use.
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
There should be no impact from projects proposed in the Water System Plan.
Measures for protection or conservation will be considered during design and
specific impacts will be evaluated at the project level.
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
This plan is compatible with existing and proposed shoreline use plans.
3. How would the proposal be likely to deplete energy or natural resources?
As water demands increase, more energy will be needed to pump water from wells
and to higher pressure zones.
Proposed measures to protect or conserve energy and natural resources are:
Included in the Water System Plan is a comprehensive water conservation program
to encourage per capita reductioninWater use.
Page 14 of 15
SEPA Checklist
2005 Bremerton Water System Plan
4. How would the proposal be likely to use or affect environmentally sensitive areas or areas
designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild
and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands,
floodplains, or prime farmlands?
Impacts to sensitive areas or other designated critical areas will be evaluated
during the design and environmental review of specific projects in this plan.
Proposed measures to protect such resources or to avoid or reduce impacts are:
None needed at this time.
5. How would the proposal be likely to affect land and shoreline use, including whether it would
allow or encourage land or shoreline uses incompatible with existing plans?
This plan is compatible with existing and proposed shoreline use plans.
Proposed measures to avoid or reduce shoreline and land use impacts are:
6. How would the proposal be likely to increase demands on transportation or public services and
utilities?
Plan propos'es to respond to projected increase in needs for water service resulting
from projected population growth in the service area. Increase in demands on
public services and utilities resulting from growth will be determined by zoning,
land use, and the demand for public services.
Proposed measures to reduce or respond to such demand(s) are:
None needed.
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or
requirements for the protection of the environment.
Plan is consistent with good management practices for water resources and does
not conflict wit current laws and regulations. Plan conforms to all laws and
requirements for the protection of the environment.
[Statutory Authority: RCW 43.21C.110. 84-05-020 (Order DE 83-39), ~ 197-11-960, filed
2/1 0/84, effective 4/4/84.]
Page 15 of 15
SEPA Checklist
2005 Bremerton Water System Plan
Bremerton Plans
for Water Supply
uf the Future
City water customers should have sufficient
supplies for the next 20 years, officials say:
BY CHRISTOPHER
DUNAGAN
CDUJlfAGAN@KITSAPSUN.COM
BREMERTON
Bremerton water officials
are thinking ahead to make
sure the city can supply wa-
ter for a growing population
and new businesses expected
to arrive in the next 20 years
and beyond.
New water supplies, con-
servation efforts and possibly
reuse of sewage effluent are
part of a plan to stretch water
resources, said Kathleen Ca-
hall, water resources manag-
er for the city.
The population served by
Bremerton water - from
Gm'st nearly to Silverdale -
{ Jected to grow by a third
~ __~lln 20 years, creating a
demand for 11.3 million gal-
lons of water per day, com-
pared to 7.7 million last year,
according to estimates.
"Water in general is some-
thing that most people don't
think about untH it is not
there," said Cahall.
State Jaw requires water
systems to update their pians
regularly, and a new law calls
for a separate plan dealing
with conservation - techni-
cally known as "efficiency."
Cahall will discuss Bremer-
ton's Water System Plan and
a new Water Use Efficien-
cy Plan at a Thursday open
house from 6 p.m. to 7:30 p.m.
Bremerton supplies more
thana third oUhe drinking
water consumed in Kitsap
County. About half is used
within the city limits, a. third.
saes to puget Sound Naval
Shipyard and the rest sup-
:llies unincorporated areas.
" Cahall said Bremerton res-
idents are fortunate to have a
sufficient supply of clean wa-
tr '.nd with care it will last
tears. The city already
meets a 2003 state Jaw that
says no more than 10 percent
of the water may leak ouf of
pipes or be otherwise wast-
ed. New rules due out next
month are expected to re-
quire all water systems to in-
stall water meters for their
customers within 10 years.
That's the best way to ensure
that the water is going where
it is supposed to go and re-
duce waste, said Leslie Gates
of the state's Office of Drink-
ing Water.
Bremerton customers use
an average of 186 gallons of .
water per day. compared to
a Western Washingtonaver-"
age of 220. Bremerton's av-
erage water use has been
dropping steadily since 1999,
when it was at 190 gpd. Rea-
sons for the lower usage in-
clude a large number of res-
idents classified as low-in-
come, higher-than-average
sewer rates and an active wa-
ter-conservation program,
according to the city's plan.
Cahall said she hopes that
the average consumption will
continue to decline as resi-
. dents living in older homes
replace their toilets and fix-
tures with low-flow models
and property owners switch
to low-water landscaping.
Meanwhile, the city Is ask-
ing the state for permission
to use existing wells needed
for future growth.
The idea of using Bremer-
ton's sewage effluent to water
Gold Mountain Golf Course
has been put on the back
burner, Cahall said. The cost
of pumping the water is a ma-
jor factor.
Also, it turns out that the
effluent contains a high con- .
centration of seawater, which
is not suitable for watering
grass. The seawater comes
into the system from ship-
yard operations and from in-
filtration into pipes along the
shoreline.
Bremerton plans to spend
$48 million over the next 20
years to improve piping and
storage, install an ultravio-
let treatment facility and deal"
with earthquake and security
Issues.
For information or to talte a
survey about water use, vis-
it wWw.ci.bremerton.wa.us
(click on "Departments,"
"Public Works" and "DrinJc-
ing Water") or call (360) 473-
5920.
...
M.E"E"I~"~"SET
What: Operi~hC:lljSe "for Bremer:
tor) water::p!~b~:"~. .. .
When: Th~rsi:Jay; 6 to 7:30 p.m.
Where: Bremerton Public Works
and Utfllties. 100 Oyster Bay Rd.
~~
I< \ TSAf SUN - 11/'if IOf
DATE SUBMITTED: i c2 - c::U - 0 (p
AGENDA BILL
CITY OF BREMERTON Jf () 6 - ;;2 e 3
CITY COUNCIL
'8
............iV~:.4.qq.~................................................................
SUBJECT: Ordinance to Adopt the City of Committee Meeting Date: December 13, 2006
Bremerton Water System Plan Update COUNCIL MEETING Date: December 20, 2006
Department: Public Works and
Utilties
Presenter: Kathleen Cahall, ~)jlJtt .
Wat~r Resources Mgr (J~
Phone: 473-2315
SUMMARY: Water system planning is essential for the Bremerton Water Utility to meet forecasted
increases in water demands. The Water System Plan identifies present and future drinking water
needs and describes a means to meet those needs in a manner consistent with federal, state, and local
laws. State regulation (Washington Administrative Code 246-290) requires public water systems to
prepare a Water System Plan every six years. The2005 City ofBremerton Water System Plan
Update meets these requirements.
A IT ACBMENJ'S: 2005 Bremerton Water System Plan Update - A Va.l \ ~\:,{-e. ov\ e. i fy VJe.I.t><;: I'+~ r. \
a. ~d. ,^o.:Jdea (Jy 11\. thV\AC- (r 0 -\'""t"l t -(
FISCAL IMPACTS (Include Budgeted Amount): The Water System Plan includes a 20-year Capital
Improvement Plan for the Water Utility estimated to cost $48 million. Improvements needed to
comply,with federal Safe'DriIikin ater Act requi[ements are described in the plan. ~., u.~~\-\ '\~-:
ClW"e,. ''''c.~ \_ ~ n 'o~e..It.
APPROVALS:
DEPARTMENT DIRECTO
CITY ATTORNEY:
FINANCE DIRECTOR:
MAYOR:
FISCALlBUDGET:
OPERATIONS:
COUNCIL PRESIDENT: :e-
RECOMMENDED MOTION: It is recommended to move to approve Ordinace # 4'l'lfo adopt the
2005 Bremerton Water System Plan.
u;,
I CONSENT AGENDA.
IG;!5,
COUNCIL ACTION: 0 ApproveD Deny 0 Table
D Continue 0 No ACtion
ORDINANCE NO. 41 q ;)-
AN ORDINANCE of the City Council of the City of
Bremerton, Washington repealing Ordinance No. 4755 and
adopting the City ofBremerton 2005 Water System Plan update.
WHEREAS, the City of Bremerton last updated its water system plan in 1999 by
adoption of Ordinance No. 4755; and
WHEREAS, the City desires to plan for the future and growth in its water system
service area; and
WHEREAS, a water system plan provides a means to meet future water system
needs; and
WHEREAS, the City is required to formally adopt a Water System Plan under
Washington State Department of Health regulations promulgated under Washington
Administrative Code 246-290-100 and Bremerton Municipal Code 15.02.020; NOW
lHEREFORE,
mE CITY COUNCIL OF THE CITY OF BREMERTON DOES HEREBY ORDAIN
AS FOLLOWS:
SECTION 1. Ordinance No. 4755 is hereby repealed in its entirety.
SECTION Z. Adoption. That the attached City of Bremerton Water System Plan
be adopted.
SECTION 3. Severability. If anyone or more sections, subsections, or
sentences of this ordinance are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this ordinance and the same shall remain in full
force and effect.
SECTION 4. Effective Date. This ordinance shall take effect and be in force ten
(10) days from and after its passage, approval and publication as provided by law.
PASSED by the City Councilthe
day of
,2006
CECIL McCONNELL, Council President
1
Wafpr ,f;vf.:fpm Plan
Approved this
day of
, 2006
CARY BOZEMAN, Mayor
ATTEST:
APPROVED AS TO FORM:
PAULA JOHNSTON, City Clerk
ROGER A. LUBOVICH, City Attorney
PUBLISHED the
EFFECTIVE the
ORDINANCE NO.
day of
day of
, 2006
, 2006
R:\Legal\Lega1\Ordinances\Public Works & Utilities\Water System Plan.doc
2
..T_~ __ C'f.._.... ____ n.
DATE SUBMITTED: 12-6-06
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
fF00 -2 B4
~ l.
.............................................................................~.......
SUBJECT: Resolution No. 30 I 'L
establishing Water Efficiency Goals for the
City of Bremerton Water Utility
Presenter:
December 13,2006
December 20,2006
Public Works and
Utilties
Kathleen Cahall,
WatGr Resources Mgr t!iI<!-
473-2315
Committee Meeting Date:
COUNCIL MEETING Date:
Department:
Phone:
SUMMARY: Passage of the Municipal Water Law in 2003 provided water utilities with more
flexibility in the exercise of water rights while also establishing water use efficiency requirements. In
response, the Washington State Department of Health is developing regulations requiring the
governing body of water systems to establish water efficency goals by July 1,2007. These goals are
to be established through a public process in conjunction with the water system's
Water System Plan. Bremerton is developing its goals at this time to coordinate with the current
Water System Plan Update adoption.
ATTACHMENTS: Proposed Resolution; Bremerton Water Utility Water Efficiency Plan and
Efficiency Goals; Comments Received During the Public Comment Process
FISCAL IMPACTS (Include Budgeted Amount): The Bremerton Water Utility plans to increase
annual expenditures for water efficiency outreach by approximately 0.25 F~ and $2,00Q for a total W
of approximately $17,000 per year. ~~ oA.A~\.,o_\ ..~~Qw:s4t "'-6c..$ ,~\~ \_~'-- ~'(
"toO' ~~~.
APPROVALS: ~
DEPARTMffiNTDIRECTOR:~
CITY ATTORNEY:
FINANCE DIRECTOR:
MAYOR:
FISCAL/BUDGET:
OPERATIONS:
COUNCIL PRESIDENT:
RECOMMENDED MOTION: Move to pass Resolution No.3ol9. to establish water efficiency
goals.
I CONSENT AGENDA
I~. B.
COUNCIL ACTiON: 0 Approve 0 Deny 0 Table
o Continue 0 No Action
RESOLUTION NO. 30 t cr
A RESOLUTION of the City Council of the City of
Bremerton, Washington to establish Water Efficiency Goals for the
City ofBremerton Water Utility.
WHEREAS, the City of Bremerton has made a commitment to water efficiency
since the early 1990' s; and
WHEREAS, the Bremerton Water Utility and its customers hav.e improved their
efficient use of water since that time; and
WHEREAS, the City desires to comply with proposed changes to the Washington
Administrative Code 246-290 requiring Bremerton to establish water efficiency goals every six
years as part of its Water System Plan approval; and
WHEREAS, water efficiency goals must describe measurable outcomes in terms
of reduced or maintained water production or. usage; and
WHEREAS, the City provided a public forum for water customers and the public
to participate and comment on the water efficiency goals; and
WHEREAS, the City Council has reviewed and considered all comments
received; NOW 11IEREFORE,
TIIE CITY COUNCIL OF mE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The following are the water efficiency goals for the City of
Bremerton Water Utility:
1. Maintain water use per single family household to below 195 gallons per day
on a three year average.
2. Keep maximum day demand less than twice the average day demand on a
three year average.
3. Maintainnon-revenue water below 8% on a three year average,
SECTION 2. Water Efficiency Goals may be changed in accordance with
Washington Administrative Code 246-290.
SECTION 3. Severabilitv. . If anyone or more sections, subsections, or
sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not
Water Efficiencv Goals
affect the validity of the remaining portion of this Resolution and the same shall remain in full
force and effect.
SECTION 4. Effective Date. This Resolution shall take effect and be in force
immediately upon its passage.
day of
PASSED by the City Council of the City of Bremerton, Washington this
, 2006.
CECIL McCONNELL, Council President
APPROVED AS TO FORM:
ATTEST:
PAULA JOHNSTON, City Clerk
ROGER A. LUBOVICH, City Attorney
R:\Legal\Legal\Resolutions\PUblic Works\ Water Effenciency Goals.doc
2
1"'~":"I;i~ l; ,"-; - "". ~
, _<"/e-- l-l\Y'," 0 F
B.Re'E~lON
City of Bremerton
Public Works and Utilities
Water Use
Efficiency Plan
Applies to:
Bremerton Main System #08200R
Bremerton West 517 Pressure Zone System #082734
Rocky Point Water District #02052E
Latest revision: December 2006
Table of Contents
I ntrod uction .".................................................................:.................................................................... ......... 1
Current Water Use Efficiency Program ............................... ................................................................... 2
Estimated Water Saved by Bremerton's WUEPciver the Last Six years......................................... 5
Water Use Efficiency Goal-setting ................................... .... .......... ....................... ..... ............. .......... ...... 7
Rationale for Goal Setting................................................................................................................ 7
Water Use Efficiency Measures Implementation and Evaluation .................................................. 9
Public Education..............;..........;...............;.................................................................................. .. 11
I ndoor Residential........................................................................ .................................................... 12
Outdoor Residential and Commercial................... ........... ............... ................................. ............. 12
Indoor I ndustrial, Commercial, Institutional...................... ...................... ........ .......................... .... 13
Reg ulatory ......................................................................................................................................... 13
Other Measures............................................................................................................................... 13
Expenditures for Water Use Efficiency Measures ..... ................. ......................... ................................ 15
Water Distribution System Leakage Evaluation ....................... .............................................. ............. 15
Future Reductions as a Result of Water Use Efficiency.................................................................... 16
References.......................................................................................................................... ...................... 21
City of Bremerton Interim Water Use Efficiency Plan
Introduction
The City of Bremerton owns and operates a Class A municipal water system serving
approximately 52,000 people. Bremerton also owns and operates a non-transient-non-
community water system with a non-resident population of about 400 people.
Additionally, Bremerton sells water to the Puget Sound Naval Shipyard, the Rocky Point
Water District, and the City of Port Orchard. Details of water system management are
described in the City of Bremerton Water System Plan (WSP).
In 2003, the Washington State Legislature passed the Municipal Water Supply - Water
Use Efficiency Requirements Act. The Department of Health is expected to adopt water
use efficiency regulations in late 2006. These regulations will require water systems to
prepare Water Use EfficiencyPlans (WUEP).
This WUEP for the City of Bremerton is "interim" to meet the requirements of the 2005
Water System Plan schedule but is being completed before the final requirements of the
regulations in WAC 246-290-800 through 850 take effect. The new regulations will
apply to WSPs submitted for approval after July 2007.
Water use efficiency is defined by the draft rule as "increasing water supply
efficiency and water demand efficiency to minimize water withdrawals and water use".
A WUEP documents the policies and activitie~ implemented to minimize supply and
demand inefficiencies and to reduce water withdrawals and water use.
The City of Bremerton has placed an increasing emphasis on water use efficiency
efforts since the early 1990's. The City has expanded its customer program and is
active in regional water use efficiency programs such as the Water Purveyors
Association of Kitsap County (WaterPAK) Water Conservation Task Force and the
Partnership for Water Conservation Puget Sound. Efficient water use benefits the
environment, public health, and economy by helping to improve water quality, maintain
aquatic ecosystems, and protecting water resources.
The draft WUEP requirements for systems serving more than 10,000 connections are:
. Describe the current WUEP
. Estimate the water saved the past six years
. Describe water use efficiency goals and document how they were set
. Describe all water use efficiency measures to be implemented in the next six
years, including schedule and budget
. Estimate projected water savings
. Describe how the water use efficiency program will be evaluated
. Evaluate water distribution system leakage
. Provide an assessment of the water that could be saved through implementation
of water use efficiency measures
City of Bremerton Interim Water Use Efficiency Plan
Page I
How Bremerton is meeting current water efficiency requirements and how new
requirements are planned to be addressed are described in this WUEP.
Current Water Use Efficiency Program
The City of Bremerton values the continued high quality and adequate supply of its
water resources. The City believes that customer education about water quantity and
quality creates awareness which results in improved water use habits. Water use
efficiency can be viewed as a resource, an alternative to developing new water supplies
to meet new water demands. The current objectives of the City of Bremerton Water
Use Efficiency Program are as follows:
. Maintain use per ERU below 195 gallons per day per single family residence (an
estimate of the average use per ERU in Western Washington in 220 gal/day.
. Keep Maximum Day Demand less than twice the Annual Average Day Demand
. Meter every source
. Meter all demands as practicable and provide an estimate for demands that
cannot be metered (such as for flushing and firefighting)
. Maintain the water system to prevent leaks and promptly repair all leaks that
occur and maintain the difference between volume of water produced and
metered water used below 8% on a 3-year average.
. Educate customers about their water sources and basic water supply principals
. Encourage a conservation ethic
. Provide tools for customers to reduce water use
. Increase customer awareness of water-use habits and the value of water
. Reduce system wide per-capita water consumption
e Improve system reliability
. Protect environmental resources
. Ensure water use efficiency prior to developing new sources of supply
Under the new requirements, prior to July 1, 2007, Bremerton will have to implement a
public process to have City Council set water efficiency goals considering:
. Historic water use efficiency performance
. Historic Water use efficiency investment
. Customer base demographics
. Regional climate variations
. Forecasted demand characteristics
. Water supply characteristics.
. System financial viability
. System reliability
. Affordability of water rates
Implementation of the objectives has the potential for water savings on both daily and
peak demand basis, thereby delaying the need to develop costly new resources and
City of Bremerton Interim Water Use Efficiency Plan
Page 2
avoid capital costs. Water use efficiency programs will also be required if a system will
be requesting additional water rights or will be applying for State Revolving Fund loans.
Under the new regulations, the City of Bremerton is required to implement the measures
for a large system (over 10,000 connections). The table below identifies the measures
required for both medium and large public water systems under the previous
recommendations. In addition to these measures; demand has also been reduced by
the 1992 Energy Policy Act which requires efficient plumbing features in new
construction.
Table 1 shows how Bremerton exceeds the recommended water use efficiency program
for public water systems (from "Conservation Planning Requirements" Washington
State Department of Health, March 1994).
City of Bremerton Interim Water Use Efficiency Plan
Page 3
Table 1
Recommended DOH Water Conservation Program
(current requirements effective 1994)
Recommended Implemented by
for Medium Bremerton
A. Public Education Systems
1. School Outreach ./
2. Speakers Bureau ./
3. Program Promotion ./ ./
4. Theme Shows and Fairs ./
B. Technical Assistance
1. Purveyor Assistance ./ ./
2. Customer Assistance ./ ./
.
3. Technical Studies ./
4. Bill Showing ./ ./
Consumption History
C. System Measures
1. Source Meters ./ ./
2. Service Meters ./ ./
3. Unaccounted Water/Leak ./ ./
Detection
D. Incentives/Other Measures
1. S ingle-family/Multi-family
Kits ./ ./
2. Nurseries/Agriculture
3. Landscape Management! ./
Playfields/ Xeriscaping ./ ./
4. Conservation Pricing
5. Utility Financed Retrofit ./ ./
6. Seasonal Demand
Management ./
7. Recycling/Reuse
./
Under the new regulations, Bremerton will have to implement or evaluate at least nine
water use efficiency measures.
Bremerton's current program exceeds this requirement as described in Table 3.
City of Bremerton Interim Water Use Efficiency Plan
Page 4
Estimated Water Saved by Bremerton's WUEP over the Last Six Years
A good measure of water savings is to look at use per single family unit (also known as
an equivalent residential unit (ERU)). Bremerton's water use per ERU has been
dropping steadily as indicated in Figure 1. From 1999 - 2004 the use per ERU dropped
from 190 to 184 gallons per day, a 3.2 % decrease. Use per ERU dropped even more
in 2005 due to media attention to the drought.
240
City of Bremerton Public Works and Utilities
Equivalent Residential Units
140
120
220 _
200
~
0::
w 180
>.
co
:e 160
c;
C>
100 \'.
1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005
--- Gal/dayJERU ----.- Running Average -+- Average Western WA Use
Figure 1
Bremerton's average water use per ERU from 1999 - 2004 is only 183 gallons per day.
This figure is low compared to the estimated Western Washington average use per
ERU of 220 gallons per day and reflects several characteristics of Bremerton's system
including:
. Small lot size within the City limits
. A much higher percentage of rentals (60%) than the national average (40%)
. 49% of Bremerton's residents are classified as low income
. Much higher sewer rates than the state average
.An active water conservation program.
Table 2 presents the results of Bremerton's water conservation program from 1999
through 2004.
City of Bremerton Interim Water Use Efficiency Plan
Page 5
Table 2
Water Conservation Goals and Achievements 1999 - 2004
Customer Conservation Projected Actual
Class Goal Indoor Outdoor Demand Demand Explanation
Reduction Reduction
Bremerton's
conservation
Influence 5% of Use program focus is
accounts Savings of reduced by primarily on this
Single- ( approximately 80,000 gpd customer class
family 700 units) each ./ ./ for an ADD 90,000 gpd resulting in an
for an ADD
homes year to reduce of 2.64 of 2.63 expected response.
their water use MGD MGD There was also a
10% 4.2% reduction
population during
this time.
Influence 5% of Use
the units Savings of reduced by The 4.2% reduction
(approximately 12,000 gpd in population would
Multi-family 300 units) each ./ for an ADD 110,000 gpd have affected this
year to reduce of 0.79 for an ADD customer class the
of 0.69
their water use MGD MGD most.
bv5%
Influence 5% of Use There has been an
accounts Savings of increased increase in number
( approximately 12,000 gpd by 290,000 of commercial
Commercial 130 units) each ./ for an ADD accounts and the
year to reduce of 0.76 gpd for an WWTP has used
ADD of 1.06
their water use MGD MGD more water for their
bv5% odor control system.
Influence 5% of During the 2001
the irrigation Use drought, a major
Savings of focus was on
accounts 6,500 gpd reduced by reducing irrigation
Irrigation ( approximately ./ for an ADD 140,000 gpd resulting in
10 accounts) of 0.43 for an ADD operational
each year to MGD of 0.30 changes, especially
reduce their use MGD
by 5%. with the City Golf
Course and Parks.
Savings of Use
Reduce total reduced by Although asked, the
water use by './ . 100,000 gpd 1,070;000 Navy does not. have
Navy ./ for an ADD
10% from 1999 of 3.24 gpd for an an explanation for
- 2019 MGD ADD of 2.27 the decreased use.
MGD
City of Bremerton Interim Water Use Efficiency Plan
Page 6
Water Use Efficiency Goal-setting
Water efficiency goals must:
. Describe measurable outcomes in terms of reduced or maintained water production
or usage.
. Be set in a public forum that provides opportunity for consumers to participate and
comment.
. Be reviewed by the City Council who will consider all comments received.
. Be updated every 6 years as part of the Water System Plan approval process.
Bremerton is already doing an excellent job with water efficiency but still has some room
to improve. Proposed goals were selected to maintain our conservation achievements,
be reasonable to attain, and be easily communicated to our customers.
The following water efficiency goals were proposed for Bremerton:
1. Maintain water use per single family household to below 195 gallons per
day on a three year average.
2. Keep maximum day demand less than twice the average day demand on
a three year average.
3. Maintain non-revenue water below 8% on a three year average.
Rationale for Goal Setting
A large portion of Bremerton's water conservation outreach is to residents and
homeowners. The amount of water used by single family households is calculated
annually and is shown in the chart below:
City of Bremerton Public Works and Utilities
Equivalent Residential Units
230 .....
220
210 '
~ 200
~ 190
'"
;g 180.
~ 170
160
150
140 '
1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005
- Gal/day/ERU
- Proposed Goal
-- Average W. WAUse
- Linear (No Drought Data)
The average use per single family household in Western Washington is 220 gallons per
day. Bremerton has seen a steady decline in use per household since 1994. The
proposed water efficiency goal of keeping single family household use below 195
gallons per day is 11 % less than the state average and indicates the City's dedication
to maintaining the conservation advances already made.
City of Bremerton Interim Water Use Efficiency Plan
Page 7
Another emphasis of Bremerton's conservation program is to reduce high demands in
the summer by encouraging residents and businesses to use water wisely outside such
as by using recycling car washes and landscaping with plants with lower water needs.
One way to measure increased water use in the summer is to compare the water used
on the peak day with the average amount of water used throughout the year as shown
in the graph below.
Ratio Maximum Day Demand to Average Day Demand
2.2
1.8
2.0
o
~ 1.6
0::
1.4
1.2
1.0
1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
-- Ratio MDD to ADD -- Proposed Goal - Linear (No Drought Data)
Bremerton thinks that keeping this ratio below two is a reasonable way to evaluate our
outdoor conservation program. Future conservation outreach will continue to
emphasize prudent outdoor water habits.
In addition to our water customers being efficient with their water, the water system itself
has to be efficient. Bremerton carefully manages its water resources by tracking all the
water it uses through source meters, tracking customer use through individual meters,
ensuring main breaks are promptly detected and fixed, and being alert to other water
losses. Each year we compare the amount of water produced to the amount of water
sold to customers as shown in the chart below.
City of Bremerton Public Works and Utilities
Non-revenue Water
(Water Production vs. Consumption)
10"10 .
9%
8"10
7"10
6%
% 5%
4"10
3"10 .
2"10
1"10
0"10
Re ulatory Llmt
Proposed Goal
1999
2000
2001
.2002
2003
2004
2005
= "10 DIFFERENCE
- Linear ("10 DIFFERENCE)
City of Bremerton Interim Water Use Efficiency Plan
Page 8
The new water efficiency regulations require that the amount of water lost through
system leaks be less than 10%. Bremerton proposes that the amount of water not
measured by customer meters ("non-revenue" water), which includes leaks, plus water
used for flushing, firefighting, and other non-metered uses be less than 8% each year.
This is more than 20% below the state standard which only addresses leaks.
Since Bremertoil is already doing very well in the area of efficient \'vater use, these
goals aim to maintain current water-wise actions by customers and the water system.
Bremerton also proposes that these goals be averaged over a 3-year period so that an
unusual circumstance in anyone year does not cause a goal to be unachieved.
Bremerton'sforum for public input to these conservation goals was multi-faceted. In
addition to the public process during City Council approval of the water system plan, a
survey and information was available at:
. the Water Utility billing counter at 3027 Olympus Drive,
. on the City's web page at www.ci.bremerton.wa.us , and
. a public meeting held for November 16,2006 at 100 Oyster Bay Drive from 6 to
7:30 pm.
City council reviewed the comments received and since no comments recommended a
change to the. proposed goals, the City of Bremerton City Council established these
goals by resolution on December 20, 2006.
Water Use Efficiency Measures Implementation and Evaluation
Table 3 provides the descriptions of components for the proposed water use efficiency
program necessary to meet the new regulations:
· Describe the water use efficiency measures being implemented
· Schedule when water use efficiency measures will be implemented
· Budget for the measures
· Estimate water savings projections by identifying a percentage saving goal
· Evaluation to measure the success of programs
This program will apply to the two water systems owned and managed by Bremerton -
the Main System (#08200R) and the West 517 Zone System (#082734), and to the
system Bremerton contract operates - the Rocky Point Water System (#02052E).
Bremerton's wholesale customers are responsible for developing and implementing
their own WUEPs.
City of Bremerton Interim Water Use Efficiency Plan
Page 9
Table 3
City of Bremerton Water Efficiency Measures
Efficiency Measure Schedule Annual Estimated Annual Evaluation
Budget Water Savings
Education
City's Website Continuous $ 500 Count visits
Annual report Annually in the $3,000 Count CCRs sent
Sorina Track calls received
Customer bills showing history Continuous N/A Track number of bills each
cycle
Brochures Continuous $1,000 Count distribution
Information booth at events, inc!. As appropriate $2,000 Track number of visitors
Water Festival
Speakers As requested $ 500 Track attendees
Celebrate Drinkinq Water Week First week in Mav $1,500 All the education components Track Dress and events
Provide give-aways (pens, provide outreach and support the
pencils, pads, magnets, water Continuous $2,500 other efficiency measures. Track give-aways
bottles)
Work with WaterPAK on booths When events
at the Home Show, Kid's Day, $1,500 Track attendees
and the Fair occur
Participate in Partnership for
water Conservation activities Continuous $1,500 Track activities
and promotions
PSE Powerful Choices program 1/yr usually in $2,500 Track students reached.
in the schools May teacher evaluation
Indoor Residential .
Each fixed leaky toilet saves 1 0 Track testers given away,
Toilet testers Special promotion $ 500 gallons per day or 3,650 gallons
per year oer toilet. survey about use
Special promotion Each toilet replaced will save Survey about toilet
Toilet replacement promotion to begin in 2008 $ 500 approximately 20 gallons per day replacement
or 7,300 aal/vr oer toilet.
Each properly-installed kit is Track give-aways, track
Indoor kit give-away Special promotion $1,500 estimated to save 10% of indoor
water use or 6,500 oal/vr. water use, survey
Continuous, plus Supports other residential
"Be a leak seeker" campaign promotion at the $1,000 efficiency measures. Track materials distributed
fair
Leak notification letter As needed $ 500 N/A Track number of
(aoorox. 350/yr) notifications
Outdoor Residential and Commercial
Spring and $2,000 Difficult to measure as it is
Irrigation Outreach using ET Summer starting (future) a component of the use
in 2007 All measures combined are oer ERU
Irriaation brochure Sent in Mav $ 300 estimated to reduce irrigation use Track number sent
Rain gage give-away Special promotion $1,000 by 5 - 20 %. Track give-aways, survey
use
Demonstration aarden Continuous $ 500
Rain barrel promotion Continuous $ 500 Each rain barrel installed saves Survey about rain barrel
about 600 aallons/vr use
Industrial, Commercial, Institutional
Coordinate proqram with PSNS Continuous $500 An estimated 10% throuah 2019 Track PSNS water use
Commercial Irrigation Outreach . Spring and 5.-.20% of commercial irrigation Trackwater through
Surrimer starting $2,000
using ET in 2007 use irrigation meters
Regulatory
Two tier Water Rate Began in $0 Too early to evaluate Track customer bills
November 2004 affected bv the second tier
No water waste in ordinance Continuous $0 N/A Track incidences of waste
Saved 18% of summer use and Track reductions in water
Water Shortage Plan When initiated $0 reduced MDD by 3 MGD in use by customer class
drouqht vear 2001
City of Bremerton Interim Water Use Efficiency Plan
Page ] 0
Public Education
The following activities are the components of Bremerton's public education activities for
water efficiency:
City Website: The home page of the City's website has a special icon for a quick link
into the water resources section.
Bill Showinq Consumption Historv: Bremerton's water bills show the past years' water
consumption history in a table as cubic feet. The usage during the same period the
previous year is called out separately for easy comparison.
Annual Report: Each year Bremerton sends out an annual report as required by
regulations requiring a "consumer confidence report" be delivered to each customer
before July 151 each year. Bremerton includes conservation information in its annual
report.
Brochures: Bremerton has a wide variety of brochures and fact-sheets on many water
conservation topics including leak detection, water wise gardening, rain barrels, etc.
located in public places throughout the service area.
Give-awavs: A variety of give-aways remind customers about the importance of water
conservation such as: pens, pencils, magnets, and notepads with a conservation
message and phone numbers/web sites. Some give-aways actually help them
conserve such as rain gages, low flow shower heads, toilet testers, and toilet saver
bags.
Celebrate National Drinkinq Water Week: Activities include a proclamation by the
Mayor, displays at area libraries, conservation bucket give-away, and Bremerton Kitsap
Access Television water film fest.
Speakers Bureau: The City targets teachers, students and youth groups in various
programs. Bremerton provides classroom visits, video library and brochures about water
resources and conservation to schools in its service area. These educational
opportunities are advertised in the "Enviroguide: Environmental Education Resources in
Kitsap County", which has been provided to elementary, secondary, high school and
home-school educators throughout the county annually since 1998.
Theme Shows and Fairs:" The City has portable displays which are used at local theme
shows and fairs promoting the use of water efficient practices and devices, describing
the sources of drinking water and promoting efficient use of our remarkable water
resources. At some events, the display is accompanied by a staff member dressed in a
costume of Splash!, our waterdrop mascot. Additionally, the City assists with the annual
Kitsap Water Festival, which provides a day of water learning and fun to 1,000 41h grade
City of Bremerton Interim Water Use Efficiency Plan
Page II
students. At the event, the City provides displays and classroom sessions about water
resources and water conservation.
Water Purveyors Association of Kitsap (WaterPAK): Participate in WaterPAK
conservation task force and Water Conservation Coalition of Puget Sound (WCCPS):
These groups provide a presence at community events, PSAs in newspaper, radio, and
TV, and WCCPS has a website.
Puqet Sound Enerqy's (PSE) Powerful Choices Proqram: This yth grade classroom
program consists of 4 days with a focus on water, air, land, and energy. Bremerton pays
a portion of the costs of the program.
Indoor Residential
"Be a Leak seeker!" Campaiqn: Customers are encouraged to check for and fix leaks in
their home. Campaign is promoted through brochures, displays, and the WaterPAK
Kitsap County Fair booth.
Toilet Testers: Bremerton supplies toilet h3ak detectors at the front counter and at
special events.
Toilet Replacement Promotion: Customers with older toilets are encouraged to replace
them.
Indoor Kit Give-away: Indoor kits are handed out after having the customer sign a
pledge and allowing us to access their water use records.
Leak Notification: Should a customer's bill have unusual consumption, a letter and leak
brochure are sent.
Outdoor Residential and Commercial
Landscape Manaqement: The City sends a brochure annually in the spring to irrigation
customers to promote maintenance of irrigation systems and efficient watering
practices. In 1996 the City installed and has maintained a water conservation
demonstration garden at the public works and utilities facility. A brochure describing
waterwise gardening practices and a list of the plants is available at the billing office at
the facility. Bremerton has plans to provide area-specific ET information on the internet.
Rain Gaqe Give-away: Rain gages are distributed with information to encourage
waterwise gardening.
Demonstration Gardens: Demonstration gardens are located at the Utility's office at
Olympus Drive and at the Givens Center in Port Orchard. Other smaller "pocket"
gardens are being planned.
City of Bremerton Interim Water Use Efficiency Plan
Page 12
Rain Barrel Promotion: In 2001, Bremerton led a county-wide promotion on rain barrels
with 1,000 sold. Now the focus is to encourage customers to build or purchase their
own. The local Kitsap Lumber provides the kits at a reasonable cost.
Indoor Industrial, Commercial, Institutional
Coordinate with PSNS: PSNS is Bremerton's largest water consumer and uses about a
third of the water produced. They are currently proceeding with an in-depth water
conservation audit.
Regulatory
No Water Wastinq Ordinance: Bremerton Municipal Code 15.02.200 states, "Any
person or owner receiving water service shall not waste water, or allow it to be wasted,
by imperfect or leaking stops, valves, -pipes, closets, faucets, or other fixtures, or to use
the water for purposes other than those named in the application. Violation shall
constitute grounds for the discontinuation of water service. (Ord. 4309 92 (in part),
1991 )
Water Shortaqe Continqencv Plan: Last was implemented in 2001. Customers
responded appropriately and saved 18% of their previous summer's demands.
Conservation pricinq: Bremerton has a two-tiered water pricing structure to encourage
conservation.
Other Measures
Recvclinq/Reuse: Water reuse is the beneficial use of reclaimed wastewater treatment
plant effluent in compliance with Washington Departments of Ecology and Health
regulations. Bremerton currently uses reclaimed secondary wastewater effluent to
irrigate inside the wastewater treatment plant grounds and at a neighboring business.
Approximately 130 gpm is used for in-plant uses and an additional 120 gpm are used
for irrigation in the summer months for an annual total of 88 MG/year. A "Water Reuse
Feasibility Study" completed in 1998 identified the potential demands for and costs to
provide additional reclaimed water to potential users in the Bremerton area.
Bremerton's wastewater has higher than average saltwater from collection system
infiltration and Puget Sound Naval Shipyard inflow making reuse possibilities
challenging. A 2005 County-wide reuse study indicated that Bremerton had the least
potential for large:"scale reuse and recommendedgrantfunding be focused at other
locations with more feasible reuse opportunities. The City is currently evaluating the
next step to take in reuse.
City of Bremerton Interim Water Use Efficiency Plan
Page 1 3
Evaluation of Conservation Programs
Every communication effort can benefit from being evaluated. Evaluation can help a
current communication effort achieve its objective and make future efforts more
successful. Each strategy for Utility communications presented in Table 2 has
suggested methods for evaluation.
Evaluation methods Bremertpn currently employs include:
. Counting the number of brochures distributed. Are some brochures or topics more
popular than others? Are some distribution methods or locations more popular than
others?
. Track the number and kinds of customer phone calls received. What issues are
important to those who take the time to call?
. Track the number of visitors to a booth or at an event. Are some events more popular
than others?
. Review news reports in response to a news release or interview. Did press releases
generate the desired coverage? Was the information published what was intended?
Where in the paperwasthe article?
. Track City web site visits. Which pages are more popular?
. Track water use. Are customers responding to conservation methods? In the summer
of 2001 all customer classes (with the exception of PSNS) reduced water use an
average of 18% in response to extensive increase of customer outreach requesting a
voluntary 10% water reduction.
More involved evaluations can take the form of surveys. For a survey to be truly meaningful, it
needs to be performed on a random sample, with an adequate number of respondents,
containing appropriately-worded questions. Simple questionnaires can be used to get general
information as long as the results are used carefully.
The City has performed surveys as an integral part of some projects. In 1993 when the City
was required to perform customer tap sampling for compliance with the Federal Lead and
Copper Rule, a written survey was performed. Additionally, when customers received indoor
conservation kits for the technical study, a survey was performed. The surveys have assisted
the City with determining attitudes towards water use efficiency, service, cost and the optimum
methods to use to communicate with customers. The City will continue to perform surveys of
customers.
The City was the coordinator of a county-wide study to determine the effectiveness of single-
family indoor conservation kits. Over 2,000 kits were distributed countywide, with the City
distributing 650 kits. Water usage data of 140 customers before and after kit installation was
collected from seven participating water purveyors, including Bremerton. The study determined
that, on average, a 10% water savings was experienced by the study group during the winter
months. This study provided local. data to be used when promoting kits.
City of Bremerton Interim Water Use Efficiency Plan
Page 14
Expenditures for Water Use Efficiency Measures
Bremerton budgets funds to be used for water conservation and other water public outreach.
The amounts spent in past years and the proposed amount to be budgeted in the future are in
Table 4.
Table 4
Bremerton Expenditures on Customer Water Use Efficiency Activities
Year Full-time Equivalent Supplies and Services
Employees
1995 0.28 $5,000
1996 0.23 $5,293
1997 0.35 $5,369
1998 0.28 $3,936
1999 0.26 $5,978
2000 N/A N/A
2001 (drought) 0.28 $14,241
2002 0.11 $8,391
. 2003 0.15 . $8,151
2004 0.07 $8,369
2005 0.12 $5,000
2006 0.10 $17,600
Water Distribution System Leakage Evaluation
The draft new water efficiency regulation requires that water distribution system leakage
may not exceed 10% of total water produced and purchased (using a rolling 3-year
average). Compliance will begin in 2010 and will be based on data from 2007 - 2009
(details may change when the regulation is finalized).
Leakage is defined as water loss from the system that is not metered and not used for
authorized purposes such as for flushing and fire-fighting.
Bremertonis a fully-metered system. All sources are metered and all pump stations are
metered to track flows in the distribution system. All customers are metered.
Bremerton also meters the fire training center and construction hydrant meters. There
are two locations in the service area to fill tanker trucks at no cost that are metered.
Each year Bremerton calculates the difference between gallons of source water
produced and metered water to customers. This difference has been called "non-
revenue water" and it includes authorized non-metered water such as for flushing and
firefighting as well as leaks and unauthorized water use. Non-revenue water for the
past 6 years is shown in Figure 2.
City of Bremerton Interim Water Use Efficiency Plan
Page 15
City of Bremerton Public Works and Utilities
Non-revenue Water
(Water Production vs. Consumption)
10%
9%
8%
7%
6%
% 5%
4%
3%
2%
1%
0%
.----
r--- r--...
-,--- . - -- - .
- - -. .Ir - -
- - - - -.. - - - - -.. -
-.. - .
-
-
--
-
- ~
: :
9.5
9.0
8.5
8.0
7.5
7.0
6.5
6.0
5.5
5.0
M
G
D
1999
2000
2001
2002
2003
2004
2005
~ % DIFFERENCE
- PRODUCTION (MGD)
- · . CONSUMPTION (MGD)
Figure 2
The average non-revenue water for Bremerton form 2000 - 2005 is 4.7% or
approximately 130 million gallons per year. Because this difference has been
consistently well-under the 10% standard for leaks, Bremerton is not required to have a
water loss control plan. The annual components of the non-revenue water are
estimated to be:
Annual system flushing
Chlorine/pH analyzer flow to waste (6 locations @ 2 gpm)
Firefighting
Water theft
Meter inaccuracy
Leaks in the transmission AND distribution systems
Annual Average Total Non-revenue Water
11 MG
6MG
2MG
1 MG
10 MG
130 MG
130 MG
Future Reductions as a Result of Water Use Efficiency
Water demand is measured through the approximately 16,800 service meters located at
each customer's connection to the City:s system. All services are metered. Navy
contracted meters are read monthly and Water Utility personnel read the other
residential and commercial meters every other month. Average day demand for the five
years 1999 through 2004 is 7.7 MGD.
Maximum day demand (MOD) is defined as the highest amount of water used ih a
single day in the calendar year. This usually occurs in the summer as a result of
increased outdoor use. For Bremerton, this data is estimated using source production
meters. The ratio of MOD to ADD for the past five years range from 1.76 to 1.94 which
City of Bremerton Interim Water Use Efficiency Plan
Page 16
is in the expected range for Washington water systems. Forecasted MOD were
calculated using a peaking factor of 2.0.
City of Bremerton
Water Demands
18
16 - DLll.UQbLE'la
7-"G-OO IIl1lI ement ed
14
12
C 10
C> 8
:!E
6
4 -
2 -
o ,
1999 2000 2001 2002 2003 2004
II ADD liiIMDD
Figure 3
City of Bremerton
6-yr Average Water Use by Type of Use
ADD = 7.70 MGD
Non-re..enue
water
6%
Single Family
Residential
35%
Irrigation Commercial/
5% non~residential
12%.
Figure 4
City of Bremerton Interim Water Use Efficiency Plan
Page 17
Navy properties include the Puget Sound Naval.Shipyard (PSNS), Jackson Park
Housing complex, the Navy Hospital, and several other smaller accounts. The largest
demand in the entire system is PSNS which has a water demand of about 2 MGD.
Historically, the Navy has had a significant effect on Bremerton's water system. It was
due to increases in workload at PSNS and the resulting increase in Bremerton's
population that water demands skyrocketed during World War II. Within PSNS the
water uses are indListrial/commercial use (64%), shipboard use (18%), steam
production (13%), and residential use (5%).
There are approximately 1,400 non-residential water accounts in the Bremerton service
area consisting of commercial, government, and industrial entities. Other large non-
residential water users include the two area hospitals and the City's wastewater
treatment plant. The majority of businesses consist of office-based businesses,
restaurants, medical facilities, automotive shops, and services (dry cleaners, beauty
shops, etc.).
As the population grows and commercial/industrial development occurs, demands on
the water system will increase accordingly. Water systems are required to prepare two
forecasts: one forecast without conservation 'and'one forecast showing the expected
reduction from implementation of a water use efficiency program.
For the "without conservation" forecast, average day system demands were estimated
assuming a continuation of the existing residential per capita demand and using
population projections, and water use projections provided by the Navy and for planned
commercial/industrial development. Annual average demand projections were based
on the following approach:
. Residential demands for single family housing were calculated by increasing the
2004 residential demand of 2.63 MGD by the same percentage as the projected
population increases. Additional demands were reduced by 5% to account for
implementation of mandated reduced flow plumbing fixtures in new construction.
. Multi-family units forecasted demands were calculated the same way as single-
family units.
. The non-residential demands for commercial/industrial development was
calculated by increasing current demands by the same rate as population growth
and then adding the increased demands of proposed large developments to the
existing commercial/industrial demands.
. Demands for PSNS were expected to reduce from implementation of their
planned conservation program. Jackson Park Housing is built-out Demands for
the entire Navy contracted water use were estimated to be 2.34 MGD by 2019.
. Irrigation demands for custorners with separate irrigation meters were calculated
to increase at the same rate as the growth in commercial/industrial use.
A separate average day demand forecast was calculated "with conservation" taking
projected water use efficiency reductions into account as follows:
City of Bremerton Interim Water Use Efficiency Plan
Page 18
· Single family residential- reach 5% of accounts (approximately 700 units) each
year for the next 10 years and they reduce water consumption by an additional
10%. This includes reductions in both indoor and outdoor use. Since estimates
indicate Bremerton has previously reached 30% of customers, by the end of the
next ten years, 80% of single-family customers will have been reached and
influenced to conserve 5%.
· Multi-family residential- reach 5% of the units (approximately 300 units) each
year for the next 10 years and they reduce water use by 5%. Opportunities for
water use reduction are more limited with multi-family dwellers.
· Commercial - reach 5% of accounts (approximately 130 units) each year and
they reduce water use by 5%. This includes only indoor use.
· Irrigation - reach 5% of the irrigation accounts (approximately 10 accounts) each
year and they reduce use by 5%. In 2010 begin using reclaimed water at
Pendergast Park.
· Navy properties - reduce total water use by 10% over the 20-year planning
period.
· After 2010, focus water use efficiency efforts on preserving the water use
efficiency behavior of the 80% of the accounts previously reached. This
approach assumes that some customers will be resistant to water use efficiency
actions.
Table 5 and Figure 5 present the current water use forecasts.
Table 5
2005 2.n 2.50 0.74 0.74 1.13 1.13 0.32 0.32 2.23 2.28 0.44 0.45 0.13 0.05 7.91 15.62 7.81 15.63
2006 2.85 288 0.76 0.76 1.16 1.17 0.33 0.33 2.19 2.28 0.45 0.46 0.14 0.10 8.12 16.24 7.98 15.95
2007 2.02 2.00 o.n 0.78 1.21 '.22 0.34 0.34 2.14 2.28 0.47 0.46 0.14 0.25 8.47 16.93 8.24 16.48
2008 2.98 3.04 0.79 0.50 1.25 128 0.35 0.35 2.10 2.30 0.47 0.49 0.14 0.25 8.63 17.27 8.34 16.67
2009 3.04 3.12 0.81 0.82 1.28 1.31 0.38 0.38 2.05 2.31 0.46 0.50 0.14 0.25 8.81 17.62 8.42 16.85
2010 3.10 3.20 0.81 0.84 1.33 135 0.38 0.37 200 2.31 048 0.51 0.15 0.25 8.0 17.96 8.54 17.06
2011 3.15 3.27 0.84 0.88 1.37 1.39 0.37 0.38 2.00 2.32 0.49 0.52 0.15 0.25 0' 18.29 8.69 17.37
2012 3.22 3.35 0.88 0.88 1.45 1.46 0.38 0.39 2.07 2.33 0.50 0.53 0.15 0.25 9,37 16.73 8.89 17.n
2013 3.27 3.43 0.88 0.00 '.53 1.57 0.39 040 2.06 2.34 0.51 0.54 0.15 0.25 0.5 19.17 9.07 18.13
2014 3.33 3.51 0.00 0.03 1.61 1.88 040 0.41 2.08 2.34 0.52 0.56 0.16 0.25 9.81 19,62 0.25 18.51
2015 3.40 3.56 0.02 0.05 1.70 1.75 0.41 0.42 2.00 2.35 0.54 0.51 0.16 0.25 10.0 20.06 9.47 18.94
2016 3.46 3.88 0.84 0.97 1.73 1.83 0.42 0.42 2.10 2.38 0.54 0.56 0.16 0.25 10.2 20.47 9.62 19.23
2017 3.55 3.74 0.00 0.09 '.85 1.00 0.43 0.43 2.10 2.37 0.56 0.50 0.16 0.25 10. 20.87 9.87 HI.73
2018 3.62 3.82 0.08 1.01 '.84 1.09 0.43 0.44 2.11 2.37 0.57 0.60 0.17 0.25 10.86 21.31 10.08 20.16
2019 3.70 3.89 1.00 1.03 2.01 2.07 0.44 0.45 2.12 2.38 0.58 0.61 0.17 0.25 10.86 21.73 10.27 20.54
2020 3.n 3.97 1.02 1.05 2.00 215 0.45 0.46 2.12 2.39 0.50 0.63 0.17 0.25 11.07 22.15 10.47 20.05
2021 3.84 4.05 1.04 1.07 2.18 2.24 0.46 0.47 2.13 2.40 0.61 0.84 0.17 0.25 11.2 22.59 10.69 21.38
2022 3.02 4.12 1.00 '.00 225 2.31 0,47 0.46 2.14 2.40 0.62 0.85 0.18 025 11.4 22.98 10.68 21.76
2023 3.09 4.20 1.08 1.11 2.34 2.40 0.48 0.49 2.14 2.41 0.63 0.88 0.18 0.25 11.71 23.42 11.09 22.19
2024 4.00 4.27 1.10 1.13 2.42 2.48 0.40 0.50 2.15 2.42 0.84 0.67 0.18 0.25 11.91 23.83 11.zg 22.56
City of Bremerton Interim Water Use Efficiency Plan
Page 19
City of Bremerton Historical Water Use and Demand Forecast
5
25
20
>-
co
o
; 15
Co
III
<:
.2
n;
Cl
<:
~ 10
~
o
1999 2001 2003 2005 2007 2009 2011 2013 2015 2017 2019 2021 2023
-- Average Day Demand Without Conservation __ Maximum Day Demand Without Conservation
-- Average Day Demand With Conservation -- Maximum Day Demand With Conservation
Figure 5
Annual Performance Reports
Beginning in 2008, Bremerton is required to develop annual water use efficiency reports
by July 1 and must send the reports to DOH, the consumers, and anyone who requests
them, and make the reports available to the public. Water use efficiency performance
reports must include:
· Total annual water production
· Annual water distribution system leakage totals
· A description of Bremerton's vvateruse efficiency goals, including a schedule for
achieving the goals and a narrative of progress toward achieving the goals
Bremerton plans to include this information in its annual consumer confidence report. A
template for this report is in the appendix to the WUEP.
City of Bremerton Interim Water Use Efficiency Plan
Page 20
References
"Conservation Planning Requirements: Guidelines and Requirements for Public Water
Systems Regarding Water Use Reporting, Demand Forecasting Methodology, and
Conservation Programs", Washington State Department of Ecology and Washington
State Department of Health, Health Publication #331-008, March 1994.
Handbook of Water Use and Conservation, Amy Vickers, Water Plow Press, 2001.
"Water Conservation Plan Guidelines", United Stated Environmental Protection Agency,
Office of Water (4204) Washington DC 20460, EPA-832-D-98-001, August, 1998.
Water System Plan Update, City of Bremerton, 2005.
Washington Administrative Code Chapter 246-290 Section 8 (6-16-05 draft)
City of Bremerton Interim Water Use Efficiency Plan
Page 2\
Appendix
Suggested format for annual Water Use Efficiency Reports:
Water Use Efficienc Performance Re ort for 200#
Efficient water use benefits the environment, public health, and economy by helping to improve water quality, maintain
aquatic ecosystems, and protecting water resources. The City of Bremerton has emphasized water use efficiency efforts
since the early 1990's. The City has an extensive conservation program for customers and is active in regional water
use efficiency programs such as the Water Purveyors Association of Kitsap County Water and the Partnership for Water
Conservation Puget Sound.
200# Total Annual Water
Production
200# Water Distribution
Leakage
Goal
Maintain water use per
single family residence to
below 195 gallons per day.
Keep maximum day demand
less than twice the average
day demand.
Maintain non-revenue water
below 8% on a three year
average (leakage is a subset
of this value).
## Million Gallons
## Million Gallons per Day
##%
Where the Water was Used in 200#
City
46"'"
Port Orchard
<1%
Bremerton's Water Use Efficiency Goals
How Goal Was Met in
200#
Water use per single family
resident was ### gallons per
day.
Maximum day demand was
## times the average day
demand.
Non-revenue waster was
##% of the total water
produced.
Comments
Goal was met - Great job by our customers!
Average water use per single family residence in
Westem Washington is about 220 gallons per day.
Goal was met - Great job by our customers!
The highest water use day was ###, 200# when ##
million gallons per day was used.
Goal was met - Great job by the water system!
Proper operation and maintenance keeps leaks and
water loss to a minimum.
For more information on how you can save water in your home or business, visit www.ci.bremerton.wa.us or call 473-
5920.
City of Bremerton Interim Water Use Efficiency Plan
Page 22
PUBLIC WORKS & UTILITIES
Water Resources Division
Te/360-473-5315
Fax 360-473-5018
3027 Olympus Drive
Bremerton, WA 98310
May 16, 2006
Linda Bentley
Kitsap County
Department of Community Development
614 Division Street
Port Orchard, W A 98366
Geoffrey Wentlandt
City of Bremerton
Department of Community Development
345 6th Street
Bremerton, W A 98337
RE: WATER SYSTEM PLAN CONSISTENCY STATEMENT CHECKLIST
Dear Linda and Geoff:
The City of Bremerton Water Utility is in the process of updating its Water System Plan. As we
discussed a few weeks ago, water systems are now required to obtain "consistency statements" from
the local governments in their service area. Although most of the Bremerton water service area is
within city limits, approximately 20% of our customers are in unincorporated Kitsap County.
Please fill out and sign the attached blue consistency statement and return to me before July 17,
2006. Included with this letter are draft sections of Bremerton's Water System Plan, a service area
map, and section of the Bremerton Municipal Code pertaining to water service. Also attached is
additional information on the consistency statement.
If you need additional information, please call me at 473-2315 or Karen Klocke, Department of Health
Planner, at 360-664-2999.
I appreciate your attention to this new requirement.
Sincerely,
Kathleen Cahall
Water Resources Manager
Attachments
Water System Plan and Small Water System Management Program
Consistency Statement Checklist
This checklist is intended to ensure consistency of water system planning documents with adopted local
comprehensive plans and development regulations. Each local planning jurisdiction in which the water utility
provides service will review the relevant water system planning information and provide a signed consistency
statement to the utility for submittal to the Department of Health. If the local planning agency will not respond,
the highest authority within the utility (chair of governing body, executive director of private companies,etc.)
must sign to verify consistency of the plan information.
Water System Name: City of Bremerton
CPWS ID: Main System 08200R
West 517 Zone 082374
Plan Date: 2005
Planning Document Title: City of Bremerton Water System Plan
Local Planning Jurisdiction:
The retail service area, and any other areas not served by a separate public water
system, and land use identified in the WSP is consistent with the adopted
comprehensive plan and adopted development regulations and policies.
For WSPs only: The growth projection used to forecast water demand for the
retail service area is consistent with the adopted city/county's population growth
projections (and commercial development projection if applicable). If a different
growth projection was used, the alternative growth projection and methodology
proposed is acceptable based on explanation given.
For WSPs only: New potential large water users (that may have a significant
impact on the water system) that the city/county is aware of have been identified
in the WSP.
Figure 1-1
Figure 2-2
Section 2.3
Table 2-2
Section 2.3
Section 2.4.4
For city-owned systems only: All policies regarding water service outside
the corporate boundaries are included in this WSP. These policies are consistent
with the adopted comprehensive plan and development regulations.
Where the local planning agency is unable to sign a Consistency
Statement: Provide documentation of efforts to coordinate with local agencies
with a 60-day timeline for local agency to respond. Include: name of contact,
date, type of effort attempted, and response from local agency.
I certify that the above statements are true to the best of my knowledge and that these statements support the
conclusion that the subject-planning document is consistent with adopted comprehensive plans, development
regulations, and other policies.
Signature
Printed Name, Title, & Jurisdiction
Section 1.7
BMC Title 15
Date
**For any issues of inconsistency, please provide comments on how they can be resolved. **
Information Prepared by the Washington State Department of Health:
Water System Planning Consistency
with Local Plans and Development Regulations
Background
Consistency with local plans has been part of the Drinking Water regulations (WAC 246-
290-100(4)(a)(iii)) since 1977. The Municipal Water Supply - Efficiency Requirements
Act, Chapter 5, Laws of 2003 (Mu,nicipal Water Law), further emphasized that the
Department of Health's (DOH) planning processes become more closely aligned with
local comprehensive plans and development regulations. Changes to the Water Code
(RCW 90.03.386) require consistency ofthe water utility's service area with local land
use plans, comprehensive plans, coordinated water system plans, watershed plans, and
development regulations. The new section added to the State Board of Health Code
(RCW 43.20) states that water service provided to new customers must be consistent with
local land use plans, comprehensive plans and development regulations.
Service Areas
The retail service area, and any other area not served by a separate public water system,
defined in a water system plan (WSP) or small water system management program
(SWSMP) depicts where a water system currently provides water service as well as
where it plans to provide water service in the future.
Demand Forecast
WSPs forecast the water demand a water utility expects to serve within the next six years
and 20-year planning horizons. Forecasting methodologies should be consistent with
local planning population growth projections for the service area described in the WSP.
If alternatives are used to project water demand, justification for the growth projection
and methodology must be provided in the WSP.
Demonstrating Consistency
Prior to WSP submittal to the DOH, water systems need to work with local goverriments
in whose jurisdiction they provide water service to ensure consistency. There will be two
acceptable approaches to demonstrate to the DOH that consistency has been achieved:
1. The local jurisdiction( s) verifies consistency and provides documentation to
DOH.
2. If a water utility has attempted to gain verification of consistency from the local
jurisdiction but the local jurisdiction has not responded within 60 days, the
highest authority within the water utility must provide documentation of
consistency to DOH.
DOH regional office planners may be able to help the utility make the appropriate
contacts at the local level to obtain consistency determination.
For More Information:
Department of Health, Office of Drinking Water, Southwest Regional Office
360-664-0768
;;'OiJ 5" ~JoiuL S ,/sJvrJr PIa0.. ~ fp
STATE OF WASHINGTON
DEPARTMENT OF HEALTH
SOUTHWEST DRINKING WATER REGIONAL OPERATIONS
PO Box 47823, Olympia, Washington 98504-7823
TPD Re!ay .1-80D-833-6388
October 23,2006
Kathleen Cahall
City of Bremerton
3027 Olympus Drive
Bremerton, Washington 98310
Subject:
City of Bremerton Water System. ill #08200, Kitsap County; Water System Plan
(including West 517 Zone, ID # 08273); ODW Project #06-0715
Dear Ms. Cahall;
Thank you for submitting the Water System Plan (WSP) for the City of Bremerton Water System
(City). The Office of Drinking Water (ODW) is encouraged by the accomplishments of the
water system in producing this WSP. Prior to approval, the following specific comments must
be addressed. Response to these comments should be received by this office prior to
January 16, 2007.
GENERAL COMl\1ENTS (response required)
WATER SYSTEM PLAN
1. Page 1-7. The first paragraph has a statement that reads "The State requirement is a
minimum of 0.2 mg/L at the entrance to the distribution system with detectable chlorine
residual throughout the distribution system." This requirement is applicable for groundwater
systems that chlorinate and not for surface water systems. The concentration required at the
entrance to the distribution system is system-specific, which is baSed on the contact time
calculations. In addition, ODW requires a detectable residual in the distribution system and
we recommend that the minimum concentration be maintained at 0.2 mglL. Please modify
or remove this indicated statement from the text in your revised WSP.
2. Page 2-19. Table 2-5 on page 2-19 does not clearly specify the units of the values that are
presented. Please modify the table to include clearly dermed units in your revised 'VSP.
l:.~~itu:j
~l".
P/aYlI's
(b7'e&t-a~
L ~~ I'
~
t.~
Kathleen Cahall
October 23,2006
Page 2
3. Page 3-4. The Qi value for Well 16 in Table 3-2 is in,consistent with the values for Qi in
Tables 3-5 and 3-10. Please correct any discrepancies in these tables.
4. Page 3-13. The first footnote for Table 3-5. states, "1,2,3,4 - The existing water rights are
eit.1}er or both;" We do not understand t.hjs corrunent. Please explain this comment in your
revised WSP.
5. Pages 6-5 to 6-7. System Operation. Please describe specific set points for alarm
shutdowns and caIlouts, and submit this information in your revised WSP.
6. Pages 8-8 and 8-9. In the section titled "System Physical Capacity Analysis" there seems to
be two contradictory statements regarding the limiting factor for system capacity. On page
8-8 the statement is made that storage is the limiting factor and on page 8-9 the text indicates
that source capacity is the limiting factor. Please clarify this and update the text in your
revised WSP.
7. Pages 7-2 and 8-15. The fire flow hydraulic analysis was done by assigning 1,000 or 1,500
gpm (each for two bours) to nodes, depending on whether the area was residential or
commercial. However, on page 8-15 the text states that the fire flow requirements range
from 1,000 gpm (for 2 hours) to 5,000 gpm (for 4 hours). Please explain why the
maximum fire flow requirements were not included in the hydraulic modeling analysis.
8. Page 8-9. Please clarify how the storage values in Table 8-3 were derived from Tables
8-5,8:-6, and 8-12.
9. Page 8-9. Footnote #2, for Table 8-3, uses the term "firm yield for Qa". Please derme what
this term means.
10. Page 8-9. In table 8-3, the value for "Total Storage Capacity (East)" is less than the value for
"Equalizing Storage (East)". Please explain why the total storage is less than the
equalizing storage, which is one aspect of total storage.
11. Sections 8.4.6 and 8.4.7 both mention the West 517 Zone projected storage deficiency.
However, the capital improvement plan does not mention potential projects for adding
storage to the West 517 Zone. It is our understanding that the deficiency will occur when
developers build and that no specific projects have been defined. However, we recommend
including this in the eIP table in order to avoid submitting a water system plan amendment
when projects are submitted for review. Please revise your CIP and resubmit it with your
revised WSP.
12. Appendix for ODW checklists. On the Water System Submittal Form, you checked no to
number 16, the request for submittal exception. Yet you included the City ofBremerton's
Utilities Development and Construction Standards. If you wish to have the submittal
exception, please state so in your revised WSP and have the City Resolution signed and
dated.
13. Appendix for ODW checklists. The Municipal Water Law, Attaclunent 5- Program
Consistency Statement Checklist, was not submitted with the WSP. The Consistency
Statement Checklist must be completed, and signed and dated by the county planning office
Kathleen Cahall
October 23,2006
Page 3
prior to final approval of the WSP. Please submit the signed and dated checklist with
your revised WSP.
WATER QUALITY MONITORING PROGRAMS
WEST 517 ZONE WQMP
14. Addendum. The CMP needs a map showing this pressure zone with routine and repeat sites
identified. Please explain where the five required samples will be collected from in the
month following one or more unsatisfactory samples in your revised WSP.
15. Addendum. Repeat tests are required to be within five ACTIVE connections up-line and
down-line plus one site of choice. Please revise your CMP to reflect these requirements.
16. Addendum. There needs to be a schedule of the sample rotation information. Please include
this information in your revised WSP.
17. Addendum. The public notification requirements have been revised. ODW has developed a
new guidance document and specific notices for your use. Copies for your use are enclosed
in the red and teal folders. The notices may also be found on the ODW website at:
www.doh.wa.gov/ehp/dw/coliform/coliform.htm. In addition, the federal Public Notification
(PN) Handbook is available online at www.epa.gov/safewater/pws/pn/handbook.pdf. Please
incorporate the new PN requirements (enclosed) and your revised CMP in your Water
Quality Monitoring Program in yo'ur revised WSP.
BREMERTON WQMP
18. Page 3. There was no Appendix included, though it was noted in the table of contents.
Please include the Appendix information in the revised WSP.
19. Appendix A. As with the West 517 Zone, Bremerton's CMF needs a map showing this
pressure zone with routine and repeat sites identified.
20. Page 6. As with the West 517 CMP, the Bremerton CMP is lacking correct public
notification information. ODW has developed a new guidance document and specific notices
for your use, copies for your use are enclosed in the red and teal folders. The notices may
also be founl:i on the ODW website at: www.doh.wa.gov/ehp/dw/coliformlcoliform.htrn.In
addition, the federal Public Notification (PN) Handbook is available online at
www.epa.gov/safewater/pws/pn/handbook.pdf. Please incorporate the new PN
requirements (enclosed) and your revised eMP in your Water Quality Monitoring
Program in your revised WSP.
21. Page 8. As with the West 517 CMP, repeat tests are required to be within five ACTIVE
connections upline and downline plus site of choice. Please revise your coliform
monitoring plan to reflect these requirements.
Kathleen Cahall
October 23,2006
Page 4
22. Page 8. Please revise the contact phone numbers in your CMP. Sandy Brentlinger has a
direct phone line number, which is (360) 236-3044, and the Southwest Regional Office
general phone number is (360) 236-3030.
"3 p~-- t:: lI.l__ -_..~- -":-l~~=o-" l-~-'- ~ 3(\ d~y' __~_1~~__. 11'-=" b.... r\D'IIT -~~~--e~ds e--1=e-
.L .. U!:,C; U. l'1UIl-U\.,;Ulc; VIU Ul! U~ HIVc;U U U .lc;!:,UIULUIY.I UHl, Ul \J .yy lc;\..oUUllB 11 CUB 1
notification. If there is a fecal/E. coli presence, contact ODW immediately~ Beprepared to
collect more than the minimum number of repeat samples. ODW asks for source, storage,
and usually additional distribution samples. Please revise this portion of your eMP and
resubmit it with your revised WSP.
24. Page 9. Please remove Judy Morrow as a contact for ODW.
25. Page 9. ODW prefers repeat samples, especially ifroutine fecal/E. coli, to be collected on
the same day as the routine(s) were reported as positive. Also the source/storage/other
distribution samples should be collected. Please revise this portion of your CMP and
resubmit it with your revised WSP.
26. Page 9. If there is a fecal/E. coli routine and/or repeats, it is most likely to be an acute MCL.
Please revise this portion of your eMF and. resubmit it with your revised WSP.
27. Page 11. Invalidation. If test results show that there may be a sample location/tap problem,
please contact ODW and the invalidation procedure will be discussed. The system needs to
be able to duplicate results of same tap positive and up-line and down-line absent samples.
WATERSHED MANAGEMENT PROGRAM
28. Section VII. The Watershed Management Program (WMP) mentions that the City has a
control program for beaver. Please explain the details of this Program. Please include
this information in your revised WMP.
29. Section VII. Bremerton' s plans for addressing the requirements of L T2 SWTR are not
described in very much detail in Section VII of the WMP. However, Section 4.5.1 of the
WSP contains a detailed description ofBremerton's plans. In Section VII of the WMP,
please make a reference directing readers to Section 4.5.1 of the WSP if they would IiIce
to obtain detailed information about Bremerton's LT2 plans.
30. Section VII. Please describe, and locate on a map, the locations where raw water
cryptosporidium samples are taken. Please note that compliance with cryptosporidium
monitoring will be calculated using a running annual average of all samples collected.
Ecology has not sent review comments on the City's WSP. When Ecology's comment letter
arrives, we will send a copy to you under separate cover. Please remember that ODW's approval
of your WSP will not provide any guarantee, and should not be considered to provide any
guarantee concerning legal use of water or subsequent water rights decisions by Ecology.
Depending on Ecology's future actions on your water rights, additional planning or other
submittals may be required by ODW.
Kathleen Cahall
October 23, 2006
Page 5
Thank you for submitting your WSP for review. Regulations establishing a schedule of fees for
review of planning, engineering, and construction documents were adopted July 11, 2004 (WAC
246-290-990). An itemized invoice for $5,503 is enclosed.
----------If-you-have-any-questions,please-contact-Regional-ElannerKarenKlocke at (360) :23 6- 3031 or,
Regional Engineer Regina Grimm at (360) 236-3035.
Sincerely,
~1~4
KAREN KLOCKE
Office of Drinking Water Regional Planner
Enclosures
cc: City ofBremerton, West 517 Zone, ill # 08273
Kitsap County Health Department
Kitsap County Planning Department
Paul Fabiniak, Department ofEcoIogy-NWRO
Virpi Salo-Zieman, ODW
Bonnie Waybright, ODW
Bremerton~s Response to DOH Comments on the 2005 Water
System Plan Update
Water System Plan
. . I
# Page Summary of DoH Comment Bremertc:m Response 1 Action
-c- '. '. '. . I Non€needed as
I I Modify statement about minimum Email sent to Regina 11-
1-06 indicating that is I reQulation is
I 1 I 1-7 entry point chlorine residual of 0,2 I presen~e? ..
I how we read WAC 246-
I mgiL I
I I 290-692(3) and (4) I accuratelY In me I
WSp, I
I
121 Table ?-~ doec not Clearly cnecify uERUs" is in the table's T Additional note on 1
2-19 1 unit~ ~ ~ w,. '''' ,. ~t-' .. title I unit~ wa: added to
Table 2-0,
3 3-4 Well 16 Qi value inconsistent in There is no table 3-10. Table 3-2 was
Tables 3-2,3-5, and 3-10 corrected.
Need more explanation why the Ecology applied wellfield A better
I explanation was 1
4 3-13 water rights for some wells are considerations for these added to Tab!e 3-5
I combined pairs of wells and 3-6. I
I I We did not think this I I
I I level of detail was ! Enclosed is a
I I
I r::. 6-5 - 7 Request more information on set appropriate for the WSP I submittal of a
I .... points and set points change separate SOP on
I depending on season . system set points. I
I and system condition.
! 61 The correct answer is we This has been
8-8 - 9 Storage capacity inconsistency corrected in the
I i are limited by storage WSP,
I I 1000 gpm and 1500 gpm
I I ' are the minimum required I I
I fire flows for residential ::In 1 I
I
I
I
I
I
I
I
I
I I
..., 1 7-2 and 8- 1 Questioned method used for fire
I 115 I flow analysis
I I
I I
I I
I I
I I
I !
. I
I I
I I
I -. d I
commercial buildings
respectively per the 2003 I
IFe. and these values are
I used for hy?raulic ~odeiing I
I performed ior planning I
purposes. Individual I
I b~i~ding.s n;ay re~uire I
I hlgner fire rlows D8sed on I -.1 h~ . ...._....
I size and type of 11'10 C .ange neeu\:::u.
I construction per iFe table I
I B 105.1. A.ctual fire flow I
1 requirements are used in I
: hydrauiic modeling for i
I sr'\Of"'lf'IC Droiocto::: "'nd 'In I
! ,.....-..... . I. J..... -.;..... II I
i determining the amount of I
I fire SUDoression storaae i
! reqUjr~d in a pressure.... I
I '
i 7nnc I
i ~~..~. I
I I
24 9 Remove contact This has been
corrected.
25 9 Revise wording regarding repeat This has been
samples revised.
Revise wording regarding Acute . . This has been
26 9 coliform violations revised.
27 11 Call. DOH regarding invalidation This has been
. . of samples revised.
.
WATERSHED MANAGEMENT PLAN
. . . ..
28 Section VII Please explain the control SOP has been
proaram for beavers included.
29 Section VII Refer to the WSP regarding L T2 This has been
requirements revised.
30 Section VII Provide a map of Crypto This has been
samolina ooint included.
I-'ruJec ear roposeo
Number Needed By Model Pipe ID Diameter (in) Existing Diameter (in) Length (ft) 80st From (Along) At To At
P-14 2006 P-10989 W517 Transmission Main 12 8 3475 $ 500,400
P-15 2006 P-1430 W517 Transmission Main 12 8 147 $ 21,168
P-16 2006 P-1471 W517 Transmission Main 12 8 1501 $ 216,144 Aero Mobile Estates
P-17 2006 P-1472 W517 Transmission Main 12 8 1271 $ 183,024 Aero Mobile Estates
P-18 2006 P-33 W517 Transmission Main 12 8 785 $ 113,040
P-19 2006 P-46 W517 Transmission Main 12 8 878 $ 126,432 Golf Course?
P-20 2006 P-601 ,W51 Transmission Main 12 8 2283 $ 328,752 Port?
Proiect Subtotal 10,340 $ 1,488,960
P-21 2006 P-1624 Crawford/Dead-end Line 8 6 519 $ 49,824 Crawford Avenue NE->N bend Crawford Avenue N->NW bend
P-22 2006 P-1625. . CraWfO":1/oead~nd Line 8 6 411 $ 39,456 Crawford Avenue N->NW bend Crawford Avenue Dead end
Prolect Subtotal 930 $ 89,280
P-23 2006 P-3076 Halverson Loop - 2011 8 6 732 $ 70,272 Halverson Avenue East 31 st Street Halverson Avenue East 30th Street
P-24 2006 P-10033 Gorst 12 6 802 $ 115,488 Riverside Avenue W W Frontaoe Road W Pleasant Street Hawthorne Avenue W
P-25 2006 P-877 IGorst 12 8 1076 $ 154,944 W Frontage Road Bend in W Frontage Road W Frontage Road Riverside Avenue W
Prolect Subtotal 1,878 $ 270,432
P-26 2006 P-7073 Austin Dr. - 2011 10 8 1750 $ 210,000 State Hiohwav 3 NW->N bend State Hiohwav 3 1750ft N of bend
Anderson Hill/Dead-end Line -
~ 2006 P-10028. 2011 . 12 6 1260 $ 181,440 Anderson Hill Road SW SW Cook Road 1260ft S of SW Cook Road
P-28 2006 P-1303 Lewis.Ave. Loop 8 6 549 $ 52,704 Yew Street 900ft NE of Hefner Street Savles Road Lewis Avenue
P-29 2006 P-1304 eWls.Ave. Loop 8 6 270 $ 25,920 Lewis Avenue Sayles Road Lewis Avenue Sheridan Road (E intersection)
ProlectSubtotal 819 $ 78,624
P-30 2006 P-5053 PS14 suction 8 4 239 $ 22,944 ? Marlow Avenue W->N turn
P-31 2006 P-542 PS14 suction 10 6 914 $ 109,680 Windfield Avenue East 10th Street Windfield Avenue 50ft S of East 18th Street
P-32 2006 Clp.12794 New Pipe/Close Looo 8 1204 $ 115,584 Oranne Dr NW NWTa 10rRd Oranae Dr NW Sea beck Hinhwav
P-33 2006 P-1539 New Pipe 6 508 $ 36,576 Clooston Avenue N N.E. Flagstone Lane Clooston Avenue N NE Roswell Drive
P.34 2006 P-1593 New Pipe 12 1017 $ 146,448 Pine Road N.E. Flaoslone Lane Pine Road NE Pi eWQod Drive
P-35 2006 P-1594 New Pipe 8 112 $ 10,752 Pine Road N.E. Flagstone Lane Pine Road 112ft S of N.E. Flaostone Lane
P-36 2006 P-527 New Pipe 8 4 758 $ 72,768 PH10 North Lake Way NW PH10 Dead End
P-37 2006 P-4153 Mise 8 4 248 $ 23,808 Robin Avenue Dibb Street Robin Avenue East 32nd Street
P.38 2006 P-50GO Mise 10 6 295 $ 35,400 Winfield Ave Easl15th SI Winfield Ave East 16th St
P.39 2006 P-623 Mise 12 8 466 $ 67,104 Port?
P-40 2006 P-7024 Marine Drive 8 6 2900 $ 278,400 Marine Drive Cedar Drive Marine Drive Fitz Drive
P-41 2006 P-311 Jacobson/Cascade Trail area 10 6 2605 $ 312,600 Jacobson Boulevard Trenton Avenue Jacobson Boulevard NE Alder Street
P-42 2006 P-1503. Dead-end Line 8 6 1203 $ 115,488 Kilsa-n Way Bav Avenue Kilsao Way National Avenue
P-43 2006 P-1519. Dead-end Line 8 6 898 $ 86,208 Kitsao Wav Burchfield Drive Kitsao Way 900ft SE of Burchfield Drive
P-45 2006 P.523. Dead.end Line 10 8 1419 $ 170,280 North Lake Way NW 1419ft S of Lebers Lane NW North Lake Way NW Lebers Lane NW
P-46 2006 P-565. Dead-end Line 8 6 352 $ 33,792 Junioer Morrison Court Juni er Dead End
P-47 2006 P-1152 FUTURE 3 789 $ 28,404 E 18th Street Perry Avenue E 18th Street Winfield Avenue
Project Subtotal 15,927 $ 1,666,236
2005 Water System Plan Appendix
City of Bremerton
Proposed Distribution Capital Improvement Projects
2006 through 2011 Projects
6.Year Subtotal
4,055,244
2011 through 2024 Projects
P-100
P-101
P-102
P-103
2011 P-3077 Halverson Loop - 2024 8 6 445 $ 42,720 Halverson Avenue East 30th Street Halverson Avenue Sheridan Road
2011 P-3078 Halverson Loop - 2025 8 6 309 $ 29,664 Sheridan Road Halverson Avenue Sheridan Road Sanders Avenue
2011 P-3079 Halverson Loop - 2026 8 6 545 $ 52,320 Sanders Avenue Sheridan Road Sanders Avenue East 30th Street
2011 P-3080 I Ha verson Loop - 2027 8 6 351 $ 33,696 East 30th Street Sanders Avenue Sanders Avenue Halverson Avenue
Proiect Subtotal 1,650 $ 158,400
P-104
P-105
2011 P-1235
2011 P-1241
6
6
Pro ect Subtotal
484 $
2011 P-7074 Austin Drive - 2024 12 8 379 $ 54,576 State Hiwav 3 Turnquist Rd State Hiway 3 NW -> Bend
2011 P-10027 Anderson Hill - 2024 12 8 845 $ 121,680 Anderson Hill Rd SW Dead-end Anderson Hill Rd SW SW Cook Rd
2011 P-881 Garst Dist - 2024 12 8 722 $ 103,968 W Frontaae Road. State Hiohwav 16 W Frontaoe Road 60ft E of Feialey Road W
2011 P-882 Garst Dlst - 2025 12 8 91 $ 13,104 W Frontage Road 30ft W of Feigley Road W W Frontage Road Bend in W Frontage Road
Prolect Subtotal 813 $ 117,072
New W4401W256 Zone
2011 ReserVoir 2.0MG $ 2,500,000
2011 New W517 Zone Reservoir 2.0 MG $ 2,500,000
P-106
2011 P-1045
Bender Circle
P-107
P-108
P-109
P-110
R-101
R0102
6- to 20-Year Subtotal
20-year Total
.Restores fire flow to a dead end node
Pipe cost based on $12 per inch diameter per foot
403 $
341 $
744 $
38,688 Lewis Avenue Sheridan Road W intersection Lewis Avenue Sa les Road
32,736 Sheridan Road Lewis Avenue (E intersection) Sheridan Road Lewis Avenue (W intersection)
71,424
46,464 Bender Circle NE Intersection Stem & Loa Bender Circle NE NE Foster Road
$
5,569,616
9,624,860
AFFIDAVIT OF PUBLICA nON
Account # 37922 / Ad # 187801
ST ATE OF WASHINGTON
COUNTY OF KITSAP
I, Sarah Weller, being first duly sworn on oath, deposes and says: That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of
KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an office maintained in the aforesaid
place of publication of said newspaper; that the following is a true text of a legal advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following dates, to wit: ,
January 3, 2006 and that such newspaper was regularly distributed to its subscribers during all of said
period. That the full amount of the fee charged for the foregoing publication is the sum of $27.45 which
amount has not been paid in full.
~~~
(Signature of Principal Clerk)
Subscribed and sworn to before me this day of January 9, 2007
ORDINANCE NO. 4992
o/-ei
Notary Public in and for the State of Washington, Kitsap County.
AN ORDINANCE of the City Council of the City of Bremerton, Washington repealing Ordinance No.
4755 and adopting the City of Bremerton 2005 Water System Plan update.
PASSED by the City Council the 20th day of December, 2006
The full text of this ordinance is available from the City Clerk's Office, 345 Sixth Street, Suite 600,
Bremerton, W A 98337.