HomeMy WebLinkAbout3091
RESOLUTION NO. 30'\ \
A RESOLUTION of the City Council of the City of
Bremerton, Washington, adopting the Bremerton Community
School of the Future, Co-Location Project Study.
WHEREAS the Washington State Office of Public Instruction (OSPI) and the
Department of Community Trade and Economic Development (CTED) held the Summit on
School Siting in 2006 and the premise of the summit was that school districts and local
jurisdictions can work in concert to combine education facility needs with broader community
needs and the growth strategies of cities; and
WHEREAS, on October 29,2007 the City of Bremerton (City) and the Bremerton
School District (District) was selected by CTED to receive a Competitive Growth Management
Act Planning Grant in the amount of$125,000 to work cooperatively to study the concept of
locating a new middle school on the west-side of Bremerton using the findings of the Summit of
School Siting as a guide; and
WHEREAS, the City entered into a contract with NAC Architecture (NAC) of
Seattle, Washington to develop a public input process and complete the study for which the grant
funds were received; and
WHEREAS, the City, District, and NAC began a public outreach program in June
2008, requesting participation from a broad range of community members whom have interest in
the future of Bremerton and our schools; and
WHEREAS, there was a core group of citizens called the "Key Communicators"
that consistently attended the public workshops, had standing in the community and were willing
to assist the with project communication; and
WHEREAS, the City widely advertised and sponsored four public workshops on
the project on July 31, 2008, August 18, 2008, September 22, 2008, and October 27, 2008 and
solicited citizen input by providing online questionnaires; and
WHEREAS, the draft report was made available to the general public and
interested parties for review and comment at City offices and on the City's web page; and
WHEREAS, the report finds that there are significant public benefits to
developing a middle school in conjunction with a community activity center; and
WHEREAS, locating the school closer to the urban core of the city makes the
facility more accessible to the population center and is consistent with the City's Comprehensive
Plan, Countywide Planning Policies, and the State Growth Management Act; and
1
COLLABORATIVE SCHOOL SITING PROJECT
WHEREAS, the City supports the findings and conclusions of the report and
urges the District to also enter into similar findings; and
WHEREAS, the City supports the findings of the report, and encourages the
District in implementation, once student demographics illustrate the need for a new west-side
middle school; NOW THEREFORE
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The City Council hereby adopts the Bremerton Community School
of the Future, Co-Location Project Study attached hereto as Exhibit A and incorporated herein by
reference.
SECTION 2. Severabilitv. If anyone or more sections, subsections, or sentences
of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the
validity of the remaining portion of this Resolution and the same shall remain in full force and
effect.
SECTION 3. Effective Date. This Resolution shall take effect and be in force
immediately upon its passage.
~p ASSED by the City Council of the City of Bremerton, was. hington this ~
day of _~.J ,2009.
, (' c' ?f .?i
~AJ' t9'l/L--rt-e
CECIL McCONNELL, Counci President
APPROVED AS TO FORM:
ATTEST:
2
COLLABORATIVE SCHOOL SITING PROJECT
June 1, 2009
Bremerton Community School of the Future
The Co-Location Project Study
~~<=IARCHITECTURE
Contents
Acknowledgments
Executive Summary
The Purpose and Scope of the Study
Study Process and Results
Core Coordinating Committee
Fact Finding
Workshops
Workshop 1 - Goal Setting
Workshop 2 - Identify Co-location Opportunities - Big Ideas
Workshop 3 - Site and Concept Evaluation
Workshop 4 - Cost Model and Shared Use Planning
Community Outreach
Conclusions
Appendices
Appendix 1 - Workshop 1 Exhibits
Appendix 2 - Workshop 2 Exhibits
Appendix 3 - Workshop 3 Exhibits
Appendix 4 - Workshop 4 Exhibits
Appendix 5 - Miscellaneous Exhibits
A. Original Project Schedule
B. Co-Location Project Examples
C. Baseline Area Model
D. Middle School Area Comparison
E. Cost Models
F. Co-Location Talking Points
G. Community Outreach
2
4
6
8
9
10
13
15
21
27
28
I 1
31
45
57
71
77
81
129
135
139
143
147
~~~IARCHITECTURE
Acknowledgments
This study would not have been possible without the commitment of the citizens of Bremerton and Bremerton
School District. The City and School District would also like to thank CTED for the $125,000 grant which
funded this study. The following gave of their time to make this study possible:
Bremerton City Council
Cecil McConnell
Nick Wofford
Brad Gehring
Adam Brockus
Roy Runyon
Mike Shepard
Dianne Robinson
Carol Arends
Will Maupin
District 2, President
District 9, Vice-President
District 1
District 3
District 4
District 5
District 6
District 7
District 8
2
Bremerton School Board
Pat Jones
Vicki Collins
DeWayne Boyd
Louis Mitchell
Cynthia Galloway
Committee of Key Communicators
Ciana Alverto
Ken Aries
Nancy Austin
Ruth Bond
Sam Bossert
Mike Brown
Tara Broussard
Harriette Bryant
Chris Craig
Stacy Dore
Jonee Dubos
Larry Eyer
Kate Fletcher
Wendy Gordon
Marilee Hansen
DeAnn Irish
Holly James
Citizen
Bremerton School District
Bremerton Housing Authority
Kitsap Regional Library
YMCA
Boys & Girls Club / FPH Construction
Citizen
YWCA Board. President
Kitsap County Health District
Boys & Girls Club
Citizen
Kitsap Community Resources
Citizen
PSNS
Former Principal, Bremerton High School
Citizen/ Parent
Bremerton Symphony
Bremerton Community School of the Future I The Co-Location Project Study
Catherine Jett
Cheryl Knapp
Babara Martin
Will Maupin
Dick Nerf
Paul Pazooki
Liz Petersen
Jerry Reid
Steve Rice
Diane Robinson
Colleen Smidt
Linda Sullivan-Dudzic
Carollee Valentine
Bill Walgren
Quevon Wallace
Flint Walpole
Kurt Weist
Ed Wolfe
City of Bremerton
Andrea Spencer
Wyn Birkenthal
Lindsey Sehmel
Citizen
Citizen
Olympic College
City of Bremerton - City Council
City of Bremerton - Parks Board
Kitsap Economic Development Alliance Board Member
Bremerton Urban Gardeners
Boys & Girls Club
Rice, Fergus, Miller Architects
City of Bremerton - City Council
Citizen
Early Childhood Representative
Bremerton Urban Gardeners
YMCA
Student
Bremerton School District
Bremerton Housing Authority
Boys & Girls Club
I 3
Director of Community Development - City of Bremerton
Director of Parks and Recreation - City of Bremerton
Long Range Planner, Community Development - City of Bremerton
Wayne Lindberg
Bremerton School District
Director, Finance and Operations
Planning Design and Facilitation Consultants - NAqArchitecture
Greg Stack
Boris Srdar
Kevin Hannifan
Kevin Flanagan
Roger Duryea
Real Estate Consultant - Reid Real Estate
~~~IARCHITECTURE
Executive Summary
While an additional middle school is not needed in
Bremerton today, if demographic trends continue,
an additional middle school may be needed in
the future. In July of 2008 NAqArchitecture was
engaged by the City of Bremerton to study the
potential for co-locating a middle school with
a closely related public recreation facility in west
Bremerton. This was in response to a grant from
the State of Washington received by the city
to study this concept. In addition, Bremerton
School District realized that although the overall
enrollment in the district is currently declining,
population growth is occurring in west Bremerton
and a middle school will eventually be needed in
that area to accommodate this trend.
4
In concept, schools of the future will be more than
just learning places for a single age group; they will
be multi-age learning spaces that serve broader
community needs. Students are increasingly
learning outside of traditional school settings in
order to make their learning more relevant while
engaging them to become life-long learners. Co-
locating other facilities with a school is a natural
outgrowth of this trend in that it enriches the
experience of learners in the school while meeting
the needs of more community members. These
facts make the results of the Bremerton Community
School of the Future Study applicable well beyond
this project. It is a model for how schools and
community organizations can work together to
efficiently provide facilities for their communities
that both enhance learning and meet broader
community needs.
Working with representatives from the City of
Bremerton and Bremerton School District, the
NAqArchitecture team developed a plan and
schedule for the study. The study process was
designed to bring community stakeholders
together to consider the idea of a co-located
facility and share with the city and school district
their thoughts on the pros and cons of this idea.
Furthermore, the stakeholders were to recommend
where, in general, such a facility should be located
and judge how this idea might be accepted by
the broader community. Finally, the stakeholders
would be "key communicators" of the idea of a
co-located facility and be instrumental in getting
feedback on the idea from the broader community.
The study was conducted using a workshop
process spanning several months in 2008 and
2009. The workshops were organized to allow
the committee of key communicator-stakeholders
to understand the issues involved in co-location
and come to conclusion about the best co-location
options. Workshop 1 established the reasons for
co-location and the goals for a co-located facility.
These revolved around the idea that a shared
use facility would be more economical and make
essential community recreation services available to
a broad spectrum of the community.
Workshop 2 identified the best uses for co-location
Bremerton Community School of the Future I The Co-Location Project Study
with a middle school and explored the challenges
and opportunities of co-location. The study was
not intended to find specific partners for co-
location, but rather to identify the most appropriate
uses to be located with a middle school. Uses
considered ranged from orchestra practice space
and a swimming pool to a teen or senior center.
Opportunities and challenges included the ability
to provide constructive activities for teens after
school to concerns that management of shared
spaces in a co-located facility would be difficult.
The committee concluded that a teen center,
community center, or senior center would be the
best co-location partner with a middle school.
Workshop 3 focused on identifying the
configuration of a co-located facility and the
desirable characteristics for its location. An
evaluation of potential co-location partners' facility
needs showed that these were very similar for the
most highly ranked candidates. They required
approximately 5,000 SF of dedicated space outside
the middle school program for activity, storage and
similar functions. In turn the middle school would
need approximately 91,000 SF for its functions.
The resulting 96,000 SF complex would need to
be accommodated on any site considered for the
facility.
Selecting a specific site for the facility was out of the
scope of the study so the focus was to determine
the characteristics of a location that would
best support a co-located use. The committee
concluded that an ideal location would be close to
potential users 'of the facility, would enhance the
vitality of its neighborhood by its presence, would
make efficient use of existing city infrastructure,
would be environmentally sensitive, and would be
likely to attract potential partners due to its location.
A review of parcels large enough to accommodate
the facility naturally organized potential locations
as urban and suburban with Highway 3 being
the demarcation between suburban locations to
the west and urban locations to the east. The
committee determined by comparing locations to
their ideal criteria that an urban location would
best meet the goals for a co-located facility and
support the city's comprehensive plan.
Workshop 4 examined costs for urban and
suburban options and studied how the areas of a
facility might be shared. Cost estimates showed
that the urban location would likely be slightly
less expensive than a suburban location due to
lower site development costs. The committee
also determined that a co-located facility should
be distinct from the middle school so that both
facilities could have their own identity.
I 5
The committee reached out to the community to
verify their conclusions through forums, informal
conversations, and by providing information on the
city and district web sites which allowed people to
comment. Comments were limited, but supported
the concept of co-location and the urban location
for the facility. The largest concern uncovered
through comments was a questioning of the need
for an additional middle school, which highlights
the need for additional communication with
citizens on this issue.
In summary, the committee determined that
co-locating a middle school with a teen center,
community center, or senior center is a good idea.
An urban location is seen as best for such a facility
due to its ability to serve the greatest number
of citizens. Making the vision for this project a
reality will require committed partners and active
communication with the greater Bremerton
community.
~~~IARCH'TECTURE
Purpose and Scope of the Study
6
The City of Bremerton and the Bremerton School
District entered into a collaborative facilities
planning venture to facilitate co-location of a middle
school and community activity center or closely
related public recreation facility. The collaborative
effort was spurred by the 2006 Summit on School
Siting sponsored by CTED and the State Office
of Public Instruction. A premise of the Summit
was a recognition that school districts and local
jurisdictions can work in concert to mesh education
facility needs with broader community needs and
the growth strategies of cities. The city, along with
the school district, applied for a grant from the
State of Washington to study this concept and was
awarded funds for this study in the fall of 2007.
NAqArchitecture was contracted for the study in
June of 2008 and began work in July of that year.
Currently Bremerton is experiencing growth
pressure downtown and at its western edge. This
has come after a long period of population and
economic decline. Existing school and city facilities
do not meet the needs of the expanded youth,
adult and senior populations. This project seeks to
find ways to meet needs and to link school location
with the City's growth plan as envisioned in the
2004 Comprehensive Plan.
Project Goals Include:
+ Explore innovative siting options for a
West Bremerton middle school to meet
identified education and community
needs.
+ Engage stakeholders and the general
public in a facilitated process to
determine desired facility components
and programming.
+ Solidify decision maker and broad
community support for the co-located
facility to set the stage for potential
funding options.
+ Analyze a range of site and programming
options for the co-located facility.
+ Develop a model process that can be
replicated by the District and the City.
SCOPE
A major element of the project was to conduct a
thorough community involvement process.
Community involvement was intended to identify
a range of community needs and preferences,
and opportunities for co-location with a potential
future school. The process consulted community
based agencies such as the Boys & Girls Club, senior
organizations, City Parks, the School Board, sports
leagues and others. The involvement process also
consulted directly with the public for feedback and
to gauge support for school siting and co-location
options.
Bremerton Community School of the Future I The Co-Location Project Study
The study translates an array of inputs into findings
that can help the District and City make informed
decisions. The process also built partnerships among
agencies that may lead to a future co-location
project. The study built on past and ongoing
studies by varied agencies such as the City's Parks
& Open Space Master Plan and School District's
Facilities Plan. The study developed workable co-
location options based on the range of needs and
opportunities brainstormed during the involvement
process. The project evaluated a range of non-
traditional combinations of community facilities
with a future school.
The study identified potential types of partner
organizations but did not attempt to seek
commitment from these organizations to be part
of a co-located project. Similarly, the study did
not explore the operational issues or budget of a
co-located facility other than to identify potential
obstacles to operating two facilities together.
While the scope of the study did not select specific
sites, it did evaluate options for physical sites to
-' ~, . - - ':-f9"'~ .
- '~~7~' "f~... ~~~ .
.._.u _
._---...+ . ~-.
- - :.t
-, .
"l .;,,:;~..:;~<:j;;;';~
~",._~r:':.- ~_ ,r__.-.,
___.J:1-.'-:':. '..t~..M ~
-'. . --- Q. ..-- - ~--=::. ,
- 1" ~ --~
--9. .~~ :~~.
.'- - . ~:." C~._ .,._ ~" k:
f'"' - ',', ...--~ ..
'. .-' -~ ~ ---~
accommodate program alternatives. Options
were developed into conceptual level site plans
and designs for evaluation. The findings should
assist the School District and/or City on future site
selection and acquisition. Tools such as criteria,
comparative pros and cons, etc., were developed
over the course of the project. Options including
traditional 'large footprint' school sites and a
compact 'urban footprint' site were developed.
I 7
The project also developed schematic cost scenarios
for major program / site plan alternatives. The scope
of this study did not include detailed proforma
analysis since a specific site was not selected.
The intent was to compare magnitude costs of
co-location options to inform potential funding
measures and alternatives for site selection.
The City and School District were committed
to exploring options outside the boundaries of
traditional school siting and community facilities.
Progressive approaches to stretch available resources
and create a true multi-purpose community facility
were developed.
~~~IARCH'TECTURE
Study Process and Results
.,1
The Bremerton Community School of the Future
study goals and scope asked that we envision a
future facility housing two separate entities, only
one of which was known, on a non-specific site.
It required that this be done with considerable
community involvement but in such a way that
there would be room for future flexibility in decision
making.
To address these requirements we developed
a process designed to establish criteria for
success, reach-out to a broad cross section of the
community, and develop options that were specific
enough to garner reactions but not so specific that
they limited future actions.
8
The process was comprised of these steps which
are explained in more detail below.
+ Establish a core coordinating committee
to establish communication procedures,
schedule, and develop criteria for key
communicators.
+ Determine the facts as known at the
inception of the study
+ Conduct workshops to explore the issues
Workshop 1 - Goal Setting
Workshop 2 - Identify Co-location
Opportunities - Big Ideas
Workshop 3 - Site and Concept
Evaluation
Workshop 4 - Cost Model and
Shared Use Planning
+ Community Outreach
The Core Coordinating Committee
The Core Coordinating Committee was comprised
of the Director of Community Development,
the Parks and Recreation Director, a Long Range
City Planner from the City of Bremerton, and the
Director of Finance and Operations for Bremerton
School District. This committee was facilitated by
NAC lArch itectu re.
This committee was necessary to handle the
logistical arrangements necessary for community
communications and to arrange meetings. In
addition the committee met to review proposed
agendas to be sure they were addressing the
concerns of all stakeholders. The committee
developed the list of key communicators and
solicited these individuals to serve on the Citizens
Committee.
Key communicators were people from all areas of
the City and School District that had standing in the
community and were willing to talk to others about
the work of the committee. Key communicators
needed to be willing to participate in the process
and be open to the ideas of others. Some of this
group was able to attend all of the workshops,
while others were only able to manage more
Bremerton Community School of the Future I The Co-Location Project Study
limited participation.
The schedule for the study and for the engagement
of the key communicators recognized that these
community volunteers would have limited time
to devote to the study. Additionally school
holidays, availability of the School Board and City
Council and necessary preparation time between
workshops were all taken into consideration when
preparing the schedule for the project. The original
schedule anticipated a sixteen to twenty week
process comprised of up to 5 workshops along
with core committee meetings and community
outreach activities. This number of activities did
take place but the overall time for the study has
taken considerably longer to accommodate the
logistics and timing of community input.
Fact Finding
To begin the study NAqArchitecture reviewed
available information available from the City
and School District. We also toured the existing
middle school and interviewed the principal in
order to develop an area model for the middle
school component of the co-located school. We
interviewed other stakeholders such as the Boys
and Girls Club and the Parks Department to
determine facility requirements for these sorts of
possible co-location partners. Documents which
were reviewed included:
+ City of Bremerton 2004 Comprehensive
Plan
+ City of Bremerton Parks, Recreation, and
Open Space Plan
+ Bremerton School District attendance
maps
+ Bremerton School District growth
information
+ Bremerton School District Study and I
Survey 9
+ Letter from HEERY- HLM Design dated
September 5, 2007 - Site Evaluation for
Future Middle School
+ West Sound Boys and Girls Club Hope
Centers campaign literature
+ Kitsap Easy Earth information
+ West Park Development Proposal
~~~IARCHITECTURE
Workshop 1 - Goal Setting
Workshops
The Stakeholders' Workshops convened at various
locations in the City of Bremerton in the summer
and fall of 2008. Both citizens and representatives
of a broad spectrum of community organizations
were invited to join in the discovery process, which
would occur over this time. Detailed information
on the content and results from each workshop is
contained in appendices 1 through 4. Below is a
description of the content and rationale behind the
subjects covered in each workshop. A description
of the effort to prepare for some of the workshops
is also discussed. The workshops varied in length
from two to four hours.
10 I
In this foundational workshop the key
communicators/stakeholders were introduced to
each other and an overview of the entire process
was explained to them. The goal of Workshop 1
was to generate priorities and goals for the end
product, the eventual facility. An overview of the
project and the series of events that led to the co-
location study were presented to the committee.
The project evolved from a statewide workshop
held in 2006 (meeting held in Dee. '06, summary
report delivered in Feb. '07) that sought to identify
the common and conflicting issues that City/
Regional Planners and School Districts face in regard
to effective land management and school facility
development. Bremerton was awarded a grant
to further explore this issue due to an identified
need for a middle school in west Bremerton.
More specifically, the study would investigate the
opportunities and challenges that shared use with
a non-school function presents.
The committee was given an overview of the
process that would be used in the stakeholders
meetings. Small groups would be provided a topic
to brainstorm with the goal being to generate as
many ideas as possible. At various point in the
workshop small groups reported their findings to
the larger group, similar ideas were combined, and
attendees were given the opportunity to vote for
and rank the ideas.
Through a series of small group discussions and
reporting back to the larger group, they explored
three areas:
+ Belief Statements - Why is co-location a
good idea?
+ Process Goals - How will you know if the
process we use is successful for you?
+ Project Goals - What are your goals for
this project?
Participants prioritized the belief statements and
project goals through a voting exercised and the
results of this effort were discussed among the
entire group.
Bremerton Community School of the Future I The Co-Location Project Study
Small Group Session #1: Why is
Co-Location a Good Idea?
The first small group session sought to identify
why co-location is a good idea. What unique
opportunities and advantages does it present? A
full record of attendee responses can be found
in Appendix 1. The following matrix shows the
combined responses presented to the group for
voting, the number of votes each received, and the
resultant ranks:
Idea
Votes
Received
Efficient use of resources
Synergy of different services
working together: Enhances
neighborhood, creates a hub,
internal networking and sharing of
knowledge; Bring different groups
together
360 Service for students - meets
multiple student needs, helps
middle school students with choice
making
Positive public perception
Invigorate west side
Reduced travel if facility houses
uses that are commonly used by
the same people
Greater parent involvement likely
to increase success
Bring in partners to enhance
education
Consolidation of knowledge that
can be shared in facility
Enhance student activities if close
to school
Reduce environmental impact
Emergency preparedness
opportunity (as center)
23
23
13
8
7
4
4
2
o
Small Group Session #2: Process
Goals
The groups were asked to consider their goals for
the co-location study process. The following list
was developed as list of goals for the process and
helped the committee understand the priorities of
other committee members.
+ Community pride, support revitalization
of Bremerton
+ Part of a neighborhood center/support
comprehensive plan
+ Create a great school/improve academic
environment
+ Bring community together/expand
opportunities
+ Project that gets broad support
+ Maximize capital, financially responsible
+ Efficient use of resources
+ Synergy of services working together
+ 360 degree service for students
+ Responds to population centers
+ Visible, public, central
+ Environmentally sensitive
111
~~<=IARCHITECTURE
Small Group Session #3: Project!
Facility Goals
combined responses, votes, and resultant ranks.
The establishment of beliefs and goals was crucial
to the entire study. These beliefs and goals became
the judgment criteria against which options were
measured. They enabled a disparate group to
agree on common ground and transcend personal
preference in decision making.
The final session focused on goals for the project
and what attendees sought in a co-located
facility. Groups were remarkably consistent in their
responses, and the attendees voted overwhelmingly
for a visible, central facility that would both
improve the educational environment and further
the revitalization goals laid out in the Bremerton
Comprehensive Plan. The matrix below shows the
Votes
Received
Create community pride- continue revitalization, continue to change perception of
Bremerton and School District; appealing to students and community
Be Consistent with city comprehensive plan for a vibrant Bremerton: Part of a
neighborhood center Make building location visible/publidcentral
Improve academic environment: services/resources that support students and
families and make great schools
Multi use facility: brings community together and expand non-school opportunities
Increase opportunity for public health
No net loss of existing amenities/parks
Project to be LEED or environmentally responsible
Identify a project that will get broad support and use
Identify partners (public and private) to maximize capital; be fiscally sustainable
Goal
17
16
12 I
13
9
6
5
4
4
2
Bremerton Community School of the Future I The Co-Location Project Study
Workshop 2 Identify Co-location
Opportunities - Big Ideas
Workshop 2 focused on brainstorming co-location
ideas. The focus was on what sorts of public
activities it would make sense to co-locate with
a middle school given the needs of the greater
Bremerton community. The workshop began with a
review of co-location project examples from around
the world. (See Appendix 5B - Co-location Project
Examples) They were divided into four groups to
demonstrate the types of spaces incorporated:
communal, housing, commercial, and natural.
These were intended to show participants a variety
of ways others had approached this problem and
the creative solutions they developed.
Project examples were discussed as a large group
and then the committee was broken into smaller
groups to develop their own ideas. Ideas were
recorded on flip charts and shared with the large
group at the end of the breakout session. The
facilitators asked clarifying questions to ensure
that everyone was interpreting the ideas in the
same way. After these "Big Ideas" were shared,
the committee again broke into small groups to
discuss the limitations and opportunities presented
by each idea. Each group recorded their discussion
on flip charts and then shared their conclusions
with the large group. The facilitators grouped
similar ideas together along with the opportunities
and limitations they presented and then asked the
committee to prioritize the nineteen separate ideas
through a voting process. A complete listing of the
ideas and their pros and cons can be found in the
meeting minutes in Appendix 2. The following is a
matrix of each idea, the number of votes received,
and the resultant ranks.
Idea
Teen Center/Boys & Girls Club
Daycare/ Afterschool Care/Early
Childcare/Early Learning Center
Senior Center
Environmental Center -Composting
-Earth Science - Kitsap EZ Earth
-Food growing
Family Services- Connection with
social services - Parenting Support
Multi-Use Activity/Sports Center -
Indoor/outdoor activities
Community Center - Meeting -
Computers - Activities - Parent
Room
Law Enforcement Space -
Connection between students and
police
Private Business/Professional
Services - Restaurant
Public Health/Professional Services -
Medical Services
Transit Center/Park & Ride
Non-Profit Space
Adult Education Services -
Connection with Olympic College
Residential Housing
Performing Arts Center - Center for
all Arts
Pool
Religious Activities
Library
Symphony Practice Space
Votes
Received
19
11
10
9
8
8
113
7
5
5
3
2
2
o
o
o
o
~~<=IARCHITECTURE
As can be seen from the matrix, this resulted in the
emergence of three top ideas:
+ Teen Center/ Boys and Girls Club
+ Daycare/ Afterschool Center
+ Senior Center
The group discussed these ideas and agreed
that they should be the focus of additional study
with additional highly ranked ideas such as an
environmental center with community gardens
considered as possible alternative uses.
14 I
Establishing Big Ideas was important to the process
since it enabled committee members to think freely
and share ideas in a non-threatening environment.
This allowed for an open minded exchange and
resulted in the best ideas being supported by the
entire group regardless of personal agenda.
Bremerton Community School of the Future I The Co-Location Project Study
Workshop 3 - Site and Concept
Evaluation
Once the options for co-location were identified,
the team began to look at the physical
requirements for each type of facility in preparation
for Workshop 3. After reviewing the voting results
from Stakeholder's Workshop 2, a handful of
potential uses clearly emerged as the preferred
options. With this in mind, the team discussed
the co-location project and ongoing initiatives with
various community agencies including the Parks
Department, YMCA, Boys and Girls Club, United
Way, and the Bremerton School District. Several
correlations became apparent:
+ Kitsap Community Resources and the
School district were in the process of
planning an early learning and childcare
center on Naval Avenue.
+ The United Way is consolidating into
a facility downtown that will provide
connections to community and health
services, family service, and non-profit
office space.
Given these planned developments, it was
reasonable to assume that the early childcare/early
learning center and family services center needs
identified in Workshop 2 would be met elsewhere
in west Bremerton, and need not be included in
further co-location project considerations. The
committee agreed with this conclusion when it was
presented to them.
The team developed a baseline model for a co-
located facility comprising 96,000 SF. A middle
school for 800 students will require approximately
91,000 SF while a partner facility is likely to require
an additional 5,000 SF. These space requirements
were in turn used to develop the representative
site options. The uses and required areas are as
follows:
Use
Administration and Counseling
6th Grade Classrooms
7th Grade Classrooms
8th Grade Classrooms
Laboratory Spaces
Arts
Music
Library
Physical Education
Commons
Support Spaces
Subtotal
Area
Required
6,000 ft2
10,500 ft2
10,500 ft2
10,500 ft2
10,500 ft2
5,000 ft2
4,500 ft2
4,500 ft2
16,000 ft2
9,000 ft2
4,000 ft2
91,000 ft2
115
It was noted that the prioritized uses identified in
Workshop 2 would all require spaces similar in type
and size. For example, a community center would
not differ radically in shape and scale from a teen
or senior center. Given this rough equivalence,
the following areas, dedicated to the co-located
use, were added to the prototypical middle school
outline above:
Use
Community Classroom
Support Spaces
Community Storage
Community Space Subtotal
Area
Required
3,600 ft2
1,200 ft2
200 ft2
5,000ft2
Ideas such as a performing arts facility, housing,
and a swimming pool, which have unique space
requirements, were not highly ranked so they were
not studied further.
~~<=IARCHITECTURE
These area models proposed that facilities such
as the gym would be shared between the two
facilities. Additional areas such as the school
library, commons, computer lab, and even some
classrooms might be useful to the co-located
entity at the school and could be shared through
a cooperative management plan developed by the
school and the co-located entity. The team used
experience from designing these types of facilities
to develop typical spatial relationships between
functions for purposes of site planning. The
team developed diagrams explaining the project
components for use by the committee. It became
clear from this exercise that the extent to which the
two facilities were separate or apart would be a key
decision for the committee.
MIDDLE SCHOOL - 91000 ff
OTHER USES - 5000 ff
a -> a 6';, <';'<9-
<';'O''$oQ <';'O''$oQ o-?,
<1'1>0 ~o <1'1>0 ~o O'~ :>001>
o~O'~ q,;O'~ 0<<-0':1-
",/-10 0/ _6';,
'Vo %-1< 'YO' '$0 Q
00 '(s>"" <l'1>0':%,
1/",&'1~ o~O'~
~1j?'"
Q
<<-0'<>'$0;.,
1/00'",
'"1.>>.0-1(
0",
16 I
0<.;..001" O'(/. 001"
"'.<>
<I'",,-~(/. O'~ 01>
%~-').. 0<<-/' O';,~(/.
'f,.O' o-?,~-')..
r:=:I Q<<-
3600ft' 1200fe 200ft'
6000 ft' 10500 ft' 10500 ft' 10500 ft' 10500 ft' 5000 ft' 4500 ft' 4500 ft' 16000 ft' 9000 ft' 4000 ft'
LL-.~4=+n~llL. ~JJ
r:1 ~ E=7I ~ F7'7l n 1"1 F7I F-';~;~:-;.1 D non I 96000 fe
LJ tt:ij LilJ t:=J LJJ LJ U W tl~L:i~;~~! u U
URBAN SITE
FOOTPRINT
SUBURBAN SITE
21000ft"
. ADMINISTRATION AND
COUNSELING
. MUSIC
. PHYSICAL EDUCATION
. COMMONS
. SUPPORT SPACES
21000ft'
21000 fe
54000 fe
UPPER FLOORS
. CLASSROOMS
. LABORATORY SPACES
. ARTS
. LEARNING RESOURCES
75000 ft'
Bremerton Community School of the Future I The Co-Location Project Study
Once an area model for the co-located facility was
developed the team turned to the consideration of
the location and site size for the facility. This proved
to be a far more difficult task since the study was
not intended to select actual sites for options. The
team grappled with this problem by reviewing the
City's Comprehensive Plan and a previous study the
School District conducted to identify potential sites
for a future middle school. The Comprehensive
Plan urged more urban development in order to
place public services in locations most convenient to
serve the largest number of community members.
The School District study found that very few sites
were available in more urban areas, but sites would
be available in more suburban or rural areas.
; I
I
i'll !II
II' I ..1
1.11 :II
SITE SIZE
MINIMUM 9.7 ACRE
At the same time the team examined the range of
site sizes appropriate for a co-located facility and
concluded that the facility would need between
ten and thirty acres of land to accommodate the
program. The large range is influenced by the
number of fields and athletic facilities, extent to
which storm water run-off must be accommodated,
amount of parking, and compactness of the
building on the site. From this study the team
prepared diagrams of site size criteria for use by
the committee.
With this information the team reviewed available
sites in west Bremerton with the assistance of Roger
Duryea, a realtor familiar with the area. From this
analysis it appeared that smaller sites could be
identified to the east of Highway 3, while larger
sites were identified to the west of the highway.
The site sizes correspond to the population
density of these areas (rural vs. urban) in the City's
Comprehensive Plan. Based on this review Highway
3 was de~ignated as the demarcation between
suburban areas to the west and urban areas on
the east side of Highway 3. The suburban sites
were relatively similar to each other in terms of size,
slope, soils conditions, and access. Urban sites were
also similar to each other based on these criteria, so
the team determined that it would be possible to
pick representative sites on which to place urban
and suburban options. Suburban solutions would
be able to have larger sites with more fields while
urban site would be smaller and more compact.
With these criteria in mind, the team picked two
actual sites as representative sites in order to have
realistic planning constraints as we laid out the co-
located facility.
117
r,------- -_.--
':~ Tl
t: J'j
i !
:::1
NAC I ARC HIT E C T U R E
Representative Site A: Suburban Alternative
18 I
The National Guard Armory site just east of Pendergast Park was chosen to be representative of suburban sites. Its
typography and access characteristics were similartothe other parcels considered. Theteam prepared a 20-30 acre
site layoutfor a suburban middle school co-located with anotherfacility. Thevastmajorityof spaces in the suburban
school were located on the first level, resulting in a generally larger building footprint. In addition, the suburban
option provides space for onsite parking, a football field/track, two baseball/softball fields, and a soccer field.
t
Suburban Site Analysis
Suburban Site Layout
Bremerton Community School of the Future I The Co-Location Project Study
Representative Site B: Urban Alternative
The West Park redevelopment area was chosen
as representative of urban sites since access and
topography were similar to other urban sites
considered. Two options were developed for how
a co-located facility might be arranged on the site.
Both urban options preserved the 96,000 square
foot requirement outlined above, but in contrast
to the suburban option, distributed the required
spaces over two or three levels. Consequently a
much smaller building footprint is required. The
primary difference between the two urban layouts
can be found in their playfield allowances and
the treatment of parking. The first option, Urban
Option A, occupies an area of approximately( 9
acres and contains playfields to both the north and
east of the facility as well as grade level parking
near the north field. Urban option B forgoes the
playfields to the east and locates staff parking
beneath the playfield to the north, resulting in a
6 acre site. It was assumed that the field to the
119
east of Option 2 would remain a park space, and
while not a dedicated school field, shared use
would occur. Neither of the sites was available for
development which had the advantage of allowing
people to look past the reality of each site and
evaluate them as concepts. The actual location of
the representative sites was deemphasized in the
study to further focus evaluators on characteristics
of the sites rather than their locations.
t
.Aa:ESS
Urban Site Analysis
NAC I ARC H ! TEe T U R E
20 I
Armed with these tools Workshop 3 was
conducted. The area model and components of
the building were explained to the committee. Site
size requirements and the concept of representative
suburban and urban sites were discussed and site
concepts were presented. Next the beliefs and
goals for co-location were reviewed so that the
criteria for decision making would be fresh in
everyone's mind. The committee was divided into
groups and asked to brainstorm the pros and cons
of each site option, as well as evaluating which
option they believed would garner the widest
community support. Each smaller group reported
their conclusions to the large group and found that
their conclusions were similar in that the urban site
met many more of the goals established for the
project than did the suburban site. Specifically the
urban site was:
t i
~ J
SITE SIZE
LARGE 9 ACRES
SMALL 8.3 ACRES
; ~
I
i i
, I
I
.........."1.'1..
',.......... !l.
''ZO,
'.....;:-
,
;/
1
Urban Site" A" Layout
+ A more integral part of the neighborhood,
thus fostering community pride
+ In walking distance of users - less need for
bussing or cars
+ Likely to be used more
+ Potentially able to offer more services
+ Better at using existing infrastructure
+ Providing greater opportunities to
integrate adults and kids
+ A more efficient use of land
+ Safer for after school activities
+ Less cost for landscaping
+ Less cost for bussing.
+ Able to use existing fields
+ More widely usable, the track could be
used by the elderly for walking for example
+ Small/Compact - less environmental
impact.
+ Better at meeting the goals for the project
+ Easier to share
In general, the committee concluded that
developing a co-located school facility close to
the city center would serve more people, foster
the creation of a "neighborhood," and be most
consistent with the city's comprehensive plan.
A full summary of each group's response can be
found in Appendix 3.
The key to this workshop was to adequately prepare
exhibits in a way that would allow the committee
to quickly and easily understand the options and
thinking behind them. In addition, reviewing the
original goals for the project gave the committee a
frame of reference to judge the options they saw.
Applying the criteria to the options allowed the
committee to come to conclusion with confidence.
Bremerton Community School of the Future I The Co-Location Project Study
Workshop 4 Cost
Shared Use Planning
r
After the committee prioritized options in Workshop
3, the team estimated the costs for each option.
These were presented to the committee in order to
determine if the costs for the options would have
an influence on the way the committee prioritized
the options. Cost estimates showed that the
options were roughly comparable in costs with the
cost of the urban site projected to be about $1.2
million less than the suburban site. The smaller
site size and availability of utilities such as storm
water control on the urban site helped to reduce
its costs, while the extensive site development of
the suburban site drove its costs up. In a general
discussion the committee concluded that their
prioritization of the options would not change
based on the cost estimate.
Representative floor plans for each option along
with diagrams showing how spaces might be
shared were presented to the committee so they
could consider how shared use might work.
, \-~i i
:",\:,: -
t t.J.,.
.,- J :'
v,"\l~ IL.,
, I
L
;. - .'
(--.. if t: I r:- ~.'
,~ '.' .. ;1'CiI(-
"rjA~ l'~;tp"r
~ I t
~~! I!t
.... /".". ~
\ 'I.
I, I
'. ~. ' '!
Model
and
The committee was then broken into small groups
to discuss how well the plans supported shared
use and determine to what degree community
functions should be integrated with the school or
kept separate. The small groups then reported their
conclusions to the large group. The committee
concluded that separation was desirable . so
that both the middle school and the community
function maintained their own identity. This also
was seen as facilitating management of the facility
while not adversely affecting sharing.
I 21
The final subject was a discussion of how to
disseminate the conclusions of the committee to the
greater community to get broader feedback. It was
determined that the team would prepare talking
points for use by the committee and a graphic
board explaining the process and conclusions that
were reached. This workshop had the effect of
reaffirming the decisions that the committee had
made previously and set the stage for broader
community outreach. It gave the committee the
confidence to discuss their work.
NAC I ARC HIT E C T U R E
Urban Cost Model:
ESTIMATE SUMMARY
Building SF 105,000 SF
DESCRIPTION QTY Unit Price TOTAL
o GENERAL CONDITIONS 105,000 SF $ 18.86 1,980,000
30 BUILDING FOOTINGS & SLABS 105,000 SF $ 8.06 846,093
50 SUPERSTRUCTURE 105,000 SF $ 22.12 2,322,293
60 ROOFING SYSTEM 105,000 SF $ 8.31 872,117
70 EXTERIOR WALLS 105,000 SF $ 20.50 2,152,371
80 EXTERIOR DOORS & OPENINGS 105,000 SF $ 11.97 1,257,000
81 INTERIOR DOORS & OPENINGS 105,000 SF $ 4.55 477,750
91 INTERIOR PARTITIONS 105,000 SF $ 15.18 1,593,850
92 WALL FINISHES 105,000 SF $ 4.61 483,916
93 FLOOR & BASE FINISHES 105,000 SF $ 5.54 581,430
94 CEILINGS & SOFFITS 105,000 SF $ 4.49 471,000
101 INTERIOR STAIRS & RAILINGS 105,000 SF $ 1.00 105,000
102 ACCESSORIES & SPECIAL TIES 105,000 SF $ 4.81 505,050
110 FIXED EQUIPMENT 105,000 SF $ 7.58 795,900
120 CASEWORK & MILLWORK 105,000 SF $ 5.39 566,000
121 LOOSE EQUIPMENT/FURNISHINGS 105,000 SF $ 1.78 187,250
I 140 MECHANICAL CONVEYANCES 105,000 SF $ 1.43 9/7/2310
22 151 PLUMBING 105,000 SF $ 10.00 1,050,000
152 FIRE PROTECTION 105,000 SF $ 3.70 388,500
153 HVAC SYSTEM 105,000 SF $ 32.50 3,412,500
161 ELECTRIC POWER 105,000 SF $ 11.00 1,155,000
162 LIGHTING 105,000 SF $ 7.25 761,250
163 SPECIAL SYSTEMS 105,000 SF $ 11.00 1,155,000
BUILDING ONLY SUBTOTAL 105,000 SF 221.61 23,269,269
201 DEMOLITION 105,000 SF $ 0.00 0
202 SITE DEVELOPMENT 105,000 SF $ 11.52 1,209,330
203 OFF-SITE WORK 105,000 SF $ 0.48 50,000
204 SITE UTILITIES / DRAINAGE 105,000 SF $ 8.50 892,500
205 LANDSCAPE / FILEDS 105,000 SF $ 6.82 716,125
SITE ONLY SUB TOTAL $ 27.31 2,867,955
SUB TOTAL 26,137,224
DESIGN CONTINGENCY 10% 2,613,722
273.82 28,750,947
OH & PROFIT/BONDS/INSURANCE 7.00% 2,012,566
SUB TOTAL 292.99 30,763,513
ESCALATION CONTINGENCY at 7.5% per yea 4/1/11 7.5% 4,311,105.97
TOTAL PROBABLE CONSTRUCTION COST $ 334.04 35,074,619
COST WITH TAX $ 38,231,334
EXCLUDES ALL SOFT COST, ALLOW ADDITIONAL- 45%
APPROX total with soft cost - excluding land acquisition $57.5 Million
Bremerton Community School of the Future I The Co-Location Project Study
Rural Cost Model:
682
ESTIMATE SUMMARY
Building SF 105,000 SF
DESCRIPTION QTY Unit Price TOTAL
o GENERAL CONDITIONS 105,000 SF $ 17.14 1,800,000
30 BUILDING FOOTINGS & SLABS 105,000 SF $ 9.59 1,006,989
50 SUPERSTRUCTURE 105,000 SF $ 21.32 2,238,700
60 ROOFING SYSTEM 105,000 SF $ 9.36 982,800
70 EXTERIOR WALLS 105,000 SF $ 20.06 2,106,383
80 EXTERIOR DOORS & OPENINGS 105,000 SF $ 11.60 1,218,500
81 INTERIOR DOORS & OPENINGS 105,000 SF $ 4.55 477,750
91 INTERIOR PARTITIONS 105,000 SF $ 15.18 1,593,850
92 WALL FINISHES 105,000 SF $ 4.61 483,916
93 FLOOR & BASE FINISHES 105,000 SF $ 5.54 581 ,430
94 CEILINGS & SOFFITS 105,000 SF $ 4.49 471,000
101 INTERIOR STAIRS & RAILINGS 105,000 SF $ 1.00 105,000
102 ACCESSORIES & SPECIALTIES 105,000 SF $ 4.81 505,050
110 FIXED EQUIPMENT 105,000 SF $ 7.58 795,900
120 CASEWORK & MILLWORK 105,000 SF $ 5.39 566,000
121 LOOSE EQUIPMENT/FURNISHINGS 105,000 SF $ 1.78 187,250
140 MECHANICAL CONVEYANCES 105,000 SF $ 0.95 100000.00
151 PLUMBING 105,000 SF $ 10.00 1,050,000
152 FIRE PROTECTION 105,000 SF $ 3.70 388,500
153 HV AC SYSTEM 105,000 SF $ 32.50 3,412,500 123
161 ELECTRIC POWER 105,000 SF $ 11.00 1,155,000
162 LIGHTING 105,000 SF $ 7.25 761,250
163 SPECIAL SYSTEMS 105,000 SF $ 11.00 1,155,000
BUILDING ONLY SUBTOTAL 105,000 SF 220.41 23,142,768
201 DEMOLITION 105,000 SF $ 0.00 0
202 SITE DEVELOPMENT 105,000 SF $ 16.31 1,712,640
203 OFF-SITE WORK 105,000 SF $ 2.86 300,000
204 SITE UTILITIES 105,000 SF $ 5.50 577 ,500
205 LANDSCAPE / FILEDS 105,000 SF $ 9.15 960,875
SITE ONLY SUB TOTAL $ 33.82 3,551,015
SUB TOTAL (building + site) 26,693,783
DESIGN CONTINGENCY 10% 2,669,378
279.65 29,363,161
OH & PROFIT/BONDS/INSURANCE 7.00% 2,055,421
SUB TOTAL 299.22 31,418,582
ESCALATION CONTINGENCY at 8% per year to: 4/1/11 7.5% 4,402,905.46
TOTAL PROBABLE CONSTRUCTION COST $ 341.16 35,821,488
COST WITH TAX $ 39,045,422
EXCLUDES ALL SOFT COST, ALLOW ADDITIONAL- 45%
APPROX total with soft cost - excluding land acquisition $ 58.6 Million
NAC I ARC HIT E C T U R E
Sharing Diagrams:
.. .......10 ~ I
~
Inward Orientation
24
Outward Orientation
r - SMALL GROUP LEARNING I
PROJECT SPACES
- SENIOR PAL PROGRAM
- SENIORS MENTORING I
TUTORING STUDENTS
It" ~:,
. COMPUTER SKILLS CLASSES .J
. SENIOR PAL PROGRAM
. STUDENTS TEACHING SENIORS
SPACES USED BY TEENS l
IN OFF HOURS:
MUSIC, ARTS, LIBRARY
I 1
,
TEEN PAL PROGRAM.J
Bremerton Community School of the Future I The Co-Location Project Study
~'.....U...= _
: :~
I I_
I I
I-
I I-
I I_
I I_
I I
......J
L COMMUNITY STORAGE
Senior Program
- DANCING
[!JM"""'<CO~~
1-- ---
~---
I..
I
I
I
I
I
......... -
:~
I-
I
I
I-
I-
I-
I
I
.
.
......,1
L COMMUNITY STORAGE
~
Teen Program
Representative Floor Plan: Suburban Site
I 25
First Floor
J-
I
I
-.1
Second Floor
NAC I ARC HIT E C T U R E
Representative Floor Plans: Urban Site
26 I
Second Floor
r------'
r'---l l
. I I
j f
I ~
1 r
Third Floor
Bremerton Community School of the Future I The Co-Location Project Study
Community Outreach
After the committee had concluded that the urban
site was a better choice for the co-located facility,
the effort shifted to try to test this conclusion
with the broader community. Reaching out to the
broader community was attempted in several ways:
The team developed a number of talking points
for committee members to use in discussing
their conclusions with friends and neighbors.
Committee members were to bring the results
of these discussions back to the committee. (See
Appendix 5E - Talking Points)
The team developed an information handout
committee members could use with the talking
points in explaining the problem, process, and
conclusions.
The team prepared a display board that explained
the study, told about the process used, described
the options investigated, and told of the citizens
committee's conclusion that a middle school co-
located with a recreation center in an urban area
was the best choice. This board was displayed at
several school district and city facilities and people
were instructed how to give their feedback.
The city and school district created input tools on
their web sites so that citizens could be informed
and comment on the proposals
A community forum was held with display boards
set up in booths staffed by the team to explain
the process and answer questions. A brief survey
tool was developed to allow those stopping at the
booth to have their input recorded. (See Appendix
5G - Community Outreach)
127
The results of these efforts were generally
positive feedback on the committee's conclusions.
Although a variety of outreach methods were
used additional effort is still required to spread
the word about this study and get even more
input. Response to the various outreach efforts
were not robust, but the main concern expressed
by the broader group of citizens that did offer
an opinion was whether there was a need for a
new middle school given the general declining
enrollment in Bremerton School District. The
current recession also weighed heavily on people's
minds, making them wary of any proposals that
might be costly in the current economic climate.
This demonstrates the need to better inform the
public about where growth is occurring and what
the options are for meeting that growth.
~~~IARCHITECTURE
Conclusions
The Typical Pattern of Development
for New School Facilities, and a
Change Toward an Alternate Pattern
of Development
28 I
The typical pattern for new school construction is
that the school districts purchases land that has
been previously undeveloped or only marginally
developed (a green-field site). This land is typically
outside of the previously developed areas within
the school district. They generally make this
land acquisition because they predict significant
residential growth in the areas and/or it is an
area where they can purchase a land parcel they
consider to be an adequate size. The parcel needs
to accommodate the school building, parking,
all of the related play fields, and area for onsite
storm detention and wetlands mitigation. The
Office of the Superintendent of Public Instructions
(OSPI) has recommendations for school site size
based on the class levels served but this is only a
recommendation and it is very common for urban
schools to have a smaller site. The new school
facility generally operates exclusively for school use
except for afterhours use of the gym and fields by
the Parks Department or community groups.
In the course of this study, it was determined that
the above noted "typical" pattern of development
is likely not the best for the Bremerton School
District, or for other school districts with similar
characteristics. This study concluded that
Bremerton and other communities would benefit
by an alternative pattern of development in
which non-school/community services are co-
located on site with the school. This study also
determined that locating the school closer to the
developed area / urban core of the city makes the
facility more visible, more accessible and more of
a center of activity. It is expected that the property
size will be smaller than OSPI recommendations in
a more urban area due to less available land; the
appropriate size of the land would be based on high
efficiency use of fields, parking and a small building
footprint (likely multiple stories). If possible, school
development adjacent to Parks Department land
makes additional playfields more available for
school needs, thus reducing the amount of land
needed by the school. This study determined
that for Bremerton (and similar communities) the
educational experience is not expected to diminish
because of the smaller land size, rather there are
more educational opportunities available if the
school connects to community partners.
The Bremerton School of the Future Co-location
Study concludes that there would be significant
benefits to developing a middle school with a
community activity center. These benefits include:
+ Efficient use of resources
+ Synergy of different services working
together
+ Neighborhood enhancement - creates a.
hub,
+ 360 Service for students - meets multiple
student needs
+ Positive public perception
+ Invigorates west side of Bremerton
The study concludes that the best uses to co-
locate with a middle school are uses that reach out
both to children and the neighborhood in which
the facility is located. A teen center, community
center, or senior center were seen as the uses most
compatible with a middle school.
Bremerton Community School of the Future I The Co-Location Project Study
The study concludes that a co-located facility in
west Bremerton should be located on the east side
of Highway 3 on a more urban site. These are
some of the advantages the committee cited for
this approach:
+ The facility will be a more integral part of
the neighborhood, fostering community
pride
+ The facility will be in walking distance of
users - less need for bussing or cars
+ The facility will potentially able to offer
more services and is likely to be used more
+ The facility will have less environmental
impact, be a more efficient use of land, and
be a better use of existing infrastructure
+ The urban location best meets the goals
for the project
Based on historical trends, the following conditions
are expected to occur in the future years: It is
expected that there will be reduced availability of
open green-field sites as more development occurs;
increasing fuel prices will make longer commutes
more expensive; environmental regulations on
green-fields will increase; community services
needs will increase; and educational planning
will integrate education with experience outside
the classroom. These various factors support
the expectation that the alternative pattern of
development will become more common for new
school development. Additionally, co-located
school facilities that serve a broader population will
inherently garner more voter support for passage
of a bond issue proposal.
Finally, the study concludes that a co-located facility
located east of Highway 3 in west Bremerton should
be well supported by the broader community. The
task is now to create momentum for the project
by getting the word of these findings out to the
broader community, and begin the process of
attracting committed partners who will work with
the City and School District to further the vision
and make the project a reality.
I 29
~~~IARCHITECTURE
30 I
Bremerton Community School of the Future I The Co-Location Project Study
Appendix 1 :
Workshop 1 Agenda + Minutes
I 31
~~~IARCHITECTURE
~~~IARCHITECTURE
Bremerton Co-location Project
Stakeholders Workshop # 1 - Goal Setting
July 31, 2008
Agenda
4:30 - 4:45
Arrival, get name tag, find your table
4:45 - 5:15
Welcome and introductions
5:15 - 5:20
Explanation of the process
5:20 - 6:00 Establish "Belief Statements" Why is co-location a good idea?
5:20 - 5:35 Small groups discuss and record their thoughts in the form of
statements
Groups report
Individuals "vote" on top belief statements
Review top belief statements
5:35 - 5:50
5:50 - 6:00
6:00 - 6:05
6:05 - 6:10
Break- Snacks will be provided
National talent,
local focus
6:10 - 6:40 Establish the goals for this process
6: 10 - 6:25 Small groups discuss and record their thoughts in the form of
statements
6:25 - 6:40 Groups report
6:40 - 7:15 Establish the goals for the project
6:40 - 6:55 Small groups discuss and record their thoughts in the form of
statements
Groups report
Individuals "vote" on top goals for the project
Review top goals
6:55 - 7:10
7: 10 - 7:20
7:20 - 7:25
7:25 - 7:30
Summary, next steps, next meeting time and date
n: \121-08022\200\z- 200-options\a206\a206b-wkshp1agenda-080731.doc
www.nacarchitecture.com
NAC Inc I 2201 Sixth Avenue, Suite 1405 I Seattle, Washington 98121-1847 I T: 206.441.4522 I F: 206.441.7917
~~c=IARCHITECTURE
Bremerton Collaborative School Siting I Co-Location Project
Stakeholders Workshop # 1 - Goal Setting
July 31, 2008
Arrival and Introductions
Each attendee was assigned to a table with the intent to integrate people from different
groups together. Each person introduced themselves and gave a brief statement for why
they chose to participate.
Andrea Spencer from the City of Bremerton Planning Department welcomed everyone and
gave an overview of what this project is about. She noted that the project evolved from a
statewide workshop of Planners and School Districts to better understand the common and
conflicting issues that each face with effective land management and development of
school facilities. Bremerton was awarded a grant to further explore this issue, specifically
with the understanding that the School District has a recognized need to provide a middle
school facility in West Bremerton. The facility has the opportunity to have some level of
shared use with other non-school related functions that are needed in West Bremerton.
Greg Stack from NAClArchitecture gave an overview of the process that will be used in
today's session. Each table (of 5-6 people) brainstormed their thoughts on specific
questions asked of the group. Each group recorded their responses and then at the end of
each session, reported their responses to the full group.
National talent,
Small Group Session 1
local focus
Establish "Belief Statements" Why is co-location a good
idea?
The responses to this question for each group are recorded on subsequent pages.
Similar responses from various groups were summarized into one idea.
Summary statements were reviewed with the group and each individual was given
3 dots to vote for the 3 responses which most strongly represented their beliefs.
Small Group Session 2
Explore the goals people have for this process
There are separate goals for the project or facility that will result from this process,
but people should also have goals for the process we are using to determine the
best co-location opportunities for the project.
The responses to this question for each group are recorded on subsequent pages.
Small Group Session 3
Determine what goals people have for this project
or facility?
This session was intended to focus on the goals people have for co-locating
another facility with a Middle School.
www.nacarchitecture.com
NAC Inc I 2201 Sixth Avenue, Suite 1405 I Seattle, Washington 98121-1847 I T: 206.441.4522 I F: 206.441.7917
Bremerton Collaborative School Siting I Co-Location Project
Stakeholders Workshop # 1 - Goal Setting
July 31, 2008
Page 2 of 11
The responses to this question for each group are recorded on subsequent pages.
Similar responses from various groups were summarized into one idea. .
Summary statements were reviewed with the group and each individual was given
3 dots to vote for the 3 responses which most strongly represented their beliefs.
Bremerton Collaborative School Siting I Co-Location Project
Stakeholders Workshop # 1 - Goal Setting
July 31, 2008
Page 3 of 11
Small Group Session 1 Responses
Group 1:
.
.
.
.
.
.
.
.
Group 2:
.
Why Is Co-Location a Good Idea?
Efficient use of resources, shared use of facilities (cost and energy saving
potential)
Positive public perception - provide example/model
Brings different parts of the community together
Enhance student involvement and participation (lower expenses to
students, gas, etc.)
Global solutions/synergy from multiple organizations working together
May improve likelihood of success, e.g. finding available space/land
Make west side more desirable to residents and teachers; a family
environment
Help revitalize the west side
Economically feasible
o multipurpose
o real estate
o transportation
o dollar goes farther
· Logistically- walking distance
o within the facility
o within the community
· Good use of facility, lots of people always there
· More efficient to have a central location
· Groups feed off each other; networking
· Generational interaction:
o Role models/adult figures for children
o There is something different out there
· Public/Corporate partnerships; mentoring
· A well built facility good for emergency preparedness
· Consolidation of knowledge/skill/ability
· Easier to get grants for partnerships
· Health benefit possibilities.
· Combined recreational activities.
(Group 3 was merged with other groups)
Bremerton Collaborative School Siting I Co-Location Project
Stakeholders Workshop # 1 - Goal Setting
July 31, 2008
Page 4 of 11
Group 4:
. Efficiency
. Resource sharing
. Improved services to neighborhoods and families
. Improved geographic access (closer to home)
. Cost sharing
. Greater use- weekends, evenings, summer
. Safety and security; prevent vandalism
. Reduce trips; multiple services at one location
. After-school opportunities for students
. Incubator for community service groups
. Expanded community engagement
. School/Private sector relationship
. Improve transit access
. Encourage interaction with non-school population
Group 5:
· Efficiency of space
· Construction cost
· Bring other activities and info to students
· Students surrounded by community
· Dual use brings more funding and support
· Increased support of tax payers- good value
· May be a downside - "just one more thing"
· Is a better question what is the best school site?
· Draw in support for juvenile health and wellbeing
· Difference between school and community libraries
· Appeal to adults/parents; create a bond
· Increased community involvement
· Increase understanding of community resources available
· Bring in more partners to assist the School District with resources so they
can focus on education
· Greater access
· Convenience
· Neighborhood receives impact of having resources available in close
proximity
· Positive for students
Bremerton Collaborative School Siting I Co-Location Project
Stakeholders Workshop # 1 - Goal Setting
July 31, 2008
Page 5 of 11
Group 6:
.
.
.
.
.
.
.
.
.
.
.
Efficient use of resources (building, land, cost, etc.)
Brings community together
Security: More socially and physically secure because of multi-use and total
neighborhood investment
Community investment- voters more likely to support multi-use concept
Brings broad band of community demographics together
Brings synergy to a neighborhood
Pride brought into the area; jumpstart revitalization
Transformation and energizing the neighborhood
Non-traditional alliances
Reduce NIMBY-ism
Reduce environmental impact
Bremerton Collaborative School Siting I Co-Location Project
Stakeholders Workshop # 1 - Goal Setting
July 31, 2008
Page 6 of 11
Small Group Session 2 Responses
Group 1:
.
.
.
.
.
.
Group 2:
.
.
.
.
.
.
Goals for the Process
Find out what is important/values
Find quality site for Middle School
Diversity of thoughts/ideas
Chance to voice opinions
Ultimate outcome reflects the process and ideas; attendees feel ownership
in outcome
Outcome reflects community need rather than selective interests
Improved community communication to increase desire for project
Addresses the needs of all community demographics to appeal to more
voters- support for funding
Benefit whole community
Inter-generational involvement
Community centered
Antidote to "Screen Time."
Group 3 was merged with other groups
Group 4:
· Lend credibility to project
· Level of commitment from stakeholders/citizens
· Participants will become advocates
· Greater inclusion of adult/elderly services
o Elimination of barriers
· Builds recipe for success in engaging citizens
· Process builds continued community collaboration
· Be a pioneer
Bremerton Collaborative School Siting I Co-Location Project
Stakeholders Workshop # 1 - Goal Setting
July 31, 2008
Page 7 of 11
Group 5:
.
.
.
.
Group 6:
.
.
.
.
.
.
· Find a good school location
. Attract young families to the west side
· Develop excellent and desirable middle school
. Understand what the great new possibilities are; stretch our minds
· Actually get it done
o Successful concept
o Open the doors
More ways to accomplish learning at the middle school via other
community involvement
An efficient use of our time
Adopt all of our ideas
Process outcome is appealing to BSD, which will therefore drive it forward
Continue the revitalization of our community
All ideas will be considered (free flow of ideas)
The end product, best location, best usage.
It is not about building a school, but a quality community
A plan that can be accomplished (something that the community can buy
into)
To see our vision become a reality
Bremerton Collaborative School Siting I Co-Location Project
Stakeholders Workshop # 1 - Goal Setting
July 31, 2008
Page 8 of 11
Small Group Session 1 Responses
Group 1:
.
.
.
.
.
.
.
.
Group 2:
.
.
.
.
.
.
.
.
Project Goals
To build a facility that brings the community together
Make site appealing to students and community
Project is financially feasible for the School District and at least one other
community partner
Improve academic atmosphere
Raise expectation of quality
Expose students to new experiences and opportunities
Integrate students with partner populations
Environmentally friendly: green building, food growing
Well built facility
o Energy smart, Green building
Multi-use facility
Neighborhood community center
Dollar goes farther
Increase public health
Community support
Facility increases learning opportunities for all
Intergenerationallearningfsharingfrespect
Group 3 was merged with other groups
Group 4:
· Consistent with the existing plans of city, neighborhood and School District
· Identify partners to maximize capital contribution (public and private)
· Identify a project that would receive wide community support, funding,
and use
· Lifelong learning for the community as well as students
· LEED certified project
· No net loss of existing amenities
· Create community pride
· Focal point for future enhancements of community
Bremerton Collaborative School Siting I Co-Location Project
Stakeholders Workshop # 1 - Goal Setting
July 31,2008
Page 9 of 11
Group 5:
.
.
Group 6:
.
.
.
.
.
.
.
· The final product would open the doors to an excellent school that would
help in the creation of a more vibrant Bremerton
· Better School District perception
· Promote more community and parent involvement
o tutoring (multi-generational)
o Drug and alcohol treatment
o Truancy court
o After school programs for all
Visible project in town
Multiuse synergy, public/private partnerships
Continuation of the revitalization of our community
Expanding non-school opportunities and engaging non-traditional alliances
Cost reduction by including a variety of funding sources
Changing public perception of the Bremerton School District
Create community pride
Achievable and sustainable
To see our vision become a reality
Bremerton Collaborative School Siting I Co-Location Project
Stakeholders Workshop # 1 - Goal Setting
July 31, 2008
Page 10 of 11
Prioritization of Group Responses - Small Group Session 1
Why Is Co-Location a Good Idea?
Rank Idea # of votes
1 Efficient use of resources 23
1 Synergy of different services working together: 23
Enhances neighborhood, creates a hub, internal networking
and sharing of knowledge
Bring different groups together
3 360 Service for students - meets multiple student needs, helps 13
middle school students with choice making
4 Positive public perception 8
5 Invigorate west side 7
6 Reduced travel if facility houses uses that are commonly used 4
by the same people
6 Greater parent involvement likely to increase success 4
8 Bring in partners to enhance education 2
9 Enhance student activities if close to school 1
9 Reduce environmental impact 1
9 Consolidation of knowledge that can be shared in facility 1
12 Emergency preparedness opportunity (as center) 0
Bremerton Collaborative School Siting I Co-Location Project
Stakeholders Workshop # 1 - Goal Setting
July 31, 2008
Page 11 of 11
Prioritization of Group Responses - Small Group Session 3
What Goals do you have for this Projectl Facility?
Rank Goal - # of votes
1 Create community pride- continue revitalization, continue to 17
change perception of Bremerton and School District; appealing
to students and community
2 Be Consistent with city comprehensive plan for a vibrant 16
Bremerton: Part of a neighborhood center Make building
location visible/public/central
3 Improve academic environment: services/resources that 13
support students and families and make great schools
4 Multi use facility: brings community together and expand non- 9
school opportunities
5 Increase opportunity for public health 6
6 No net loss of existing amenities/parks 5
7 Identify a project that will get broad support and use 4
7 Project to be LEED or environmentally responsible 4
9 Identify partners (public and private) to maximize capital; be 2
fiscally sustainable
N :\121-08022\200\Z -200-0ptions\A204\A204a-ColoationMeetingNotes-080812.doc
Appendix 2:
Workshop 2 Agenda + Minutes
I 45
~~~IARCHITECTURE
~~~IARCHITECTURE
Bremerton Co-location Project
Stakeholders Workshop # 2
Identify Co-location Opportunities - Big Ideas
August 18, 2008
Agenda
4:30 - 4:45
Arrival, get name tag, find your table
4:45 - 4:55
Welcome and introductions
4:55 - 5:00
Explanation of the process
5:00 - 5:15
Review results from the last session
5: 15 - 5:45
Co-location examples from other places
5:45 - 6: 15
Brainstorm co-location ideas for this project
5:45 - 6:00
Small groups discuss and record their thoughts in the form of
statements
Groups report
National talent,
local focus
6:00 - 6: 15
6: 15 - 6:45 Critique co-location ideas
6:15 - 6:30 Small groups discuss Limitations and opportunities presented by
the "Big Ideas" they previously identified. Groups record their
thoughts
6:30 - 6:45 Groups report
6:45 - 6:55
Break and summary of group findings
6:55- 7: 15
Prioritize "Big Ideas"
7:15 - 7:20
7:20 - 7:25
Individuals prioritize "Big Ideas"
Review top "Big Ideas"
7:25 - 7:30
Summary, next steps, next meeting time and date
n: \121-08022\200\Z- 200-options\a206\a206b-wkshp2agenda-080818.doc
www.nacarchitecture.com
NAC Inc I 2201 Sixth Avenue, Suite 1405 I Seattle, Washington 98121-1847 I T: 206.441.4522 I F: 206.441.7917
~~~IARCHITECTURE
Bremerton Collaborative School Siting/Co-Location Project
Stakeholders Workshop #2 August 18, 2008
Arrival and Introductions
Andrea Spencer from the City of Bremerton Planning Department welcomed the group,
noted that this is the first collaborative project the city has undertaken with the School
District, and introduced the representatives from NAClArchitecture.
Greg Stack from NAClArchitecture asked individuals new to the workshop to introduce
themselves and then generally described the process we are using. The goal of Workshop
2 is to identify the top potential partners/uses that should be located with a middle school.
Workshop 3, to be held in September, will compare the impact of locating potential
partners/uses on urban and suburban sites to see how the characteristics of a site might
impact the partner selected.
It was asked if the District had identified a specific site or sites for the project. Greg
responded that the focus of the study is not to choose a site, but rather to explore the
relationship between the type of site (urban vs. suburban) and the type of co-location uses
that make the most sense for a particular type of site.
National talent,
local focus
Greg then reviewed the outcome of the first Stakeholders Workshop, which generated the
goals of the process and why co-location is a good idea. The voting totals, published in the
first meeting's minutes, were displayed and Greg noted that the goals would be revisited in
later sessions and be used to inform and evaluate future decisions.
Greg Stack, Kevin Flanagan, Boris Srdar, and Kevin Hannifan of NAClArchitecture
presented examples of co-location projects from the Northwest, the U.S., and around the
world.
Small Group Session 1 - Generating "Big Ideas"
Following the presentation, attendees were divided into four groups and asked to
brainstorm potential partners and uses, or "Big Ideas," for the project. Responses were
recorded and presented to the entire group.
Small Group Session 2 - Pros and Cons of Each "Big Idea"
The four groups then generated pros and cons for each "Big Idea" and presented their
findings. The "Big Ideas," pros and cons are recorded on subsequent pages.
The "Big Ideas" were summarized and similar items from multiple groups combined.
Individuals were given 4 dots to vote for their 4 highest priorities. The voting tally is
recorded on a subsequent page.
www.nacarchitecture.com
NAC Inc I 2201 Sixth Avenue, Suite 1405 I Seattle, Washington 98121-1847 I T: 206.441.4522 I F: 206.441.7917
Group 1 :
1. Youth Oriented Indoor and Outdoor space
Pro:
Community Involvement
Fulfill a need
Con
Security (who's coming and going)
Ownership
2. Olympic College Adult Education Facility
Pro:
Gets services closer to families
Make kids aware of college
Con:
Program compatibility
3. Adult Community Room
Pro:
Community Involvement in school
Promotes volunteers in school
Con:
Security
4. Early Learning Center (Pre-school)
Pro
Developing better relationships between age groups
Promoting babysitting/child development skills
Con:
Age appropriate contact
5. Public Health Center
Pro:
Serve large need
Promote Partnerships (Community Health/Harrison)
Con:
Community Concerns
6. Boys & Girls Club
No pros or cons recorded.
7. Family Advocate (connectivity to social services)
Pro:
Meet large need
Bring access to services into community
8. Parent Education Co-Op
Pro:
Promote parenting skills
9. Office Space for Small Non-Profits
Pro:
Bring community interests into schools
Interface with teachers and Students
An opportunity for youth oriented groups
Nutrition and Nature programs
Con:
Selection- personal views
10. Practice space for Bremerton Symphony
Pro:
Meets a need
Student connectivity to Symphony
11. Pool:
Pro:
Improved Access
Well ness/Health
Availability for sports teams
Group 2:
1. Teen Center/YMCA/Boys & Girls Club
Pro:
Need
Proximity
Peer Pressure
Con:
Competing resources
Peer Pressure
2. Restaurant/Cafe:
Pro:
Get adults to slow down
Reason to be on campus
Healthy eating/garden
Con:
Economics of business
Compete with school lunch programs
3. Community/School Food Garden
Pro:
Education
Quality interaction with different ages
4. Community/Public Health Center/Clinic
Pros:
Obvious
5. Family Services: Parenting, Financial, Literacy, Adult Education
Pro:
Parents on site
Coping skills
Con:
Some services may conflict with School
6. Residential Housing:
Pro:
Security
Helps to pay bill
Con:
Potential bad neighbor
7. Non-Profit Office/Storage/Meeting Space
Pro:
Need for small non-profits
Shared amenities
Con:
Can't provide need due to large demand
Can't afford monthly expenses
8. Performing Arts (Available To School and Community)
Pro:
Includes all arts (Le. ceramics)
Connecting students to art
Arts build community
Multi-cultural Exchange
Con:
Bremerton High School
9. Senior Center/Facilities/Learning
Pro:
Intergenerational activity
Need
10. Computer Lab for Community Use:
Pro:
Intergenerational activity
Need
11. Sports/Ball Field, Courts, Soccer with Lighting
Pro:
Children outside
Community need
Con:
Neighborhood may not like lighting or activities
Competition for other facilities
12. Transportation Hub
Pro:
Gas Prices
Efficiency
13. School On Top Of Ferry Terminal
No pros or cons recorded.
14. Law Enforcement
No pros or cons recorded.
15. Kitsap EZ Earth
No pros or cons recorded.
16. Green Building
E.g. environmental education/compost/garden/worms
No pros or cons recorded.
Group 3:
1. Early Learning and Daycare
Pro:
Proven Success
Parental involvement
Attracts parents to neighborhood
Community support
Raise property values
Time savings
Safety factor- siblings nearby
Stability
Mentoring
Con:
Older students could be a bad influence
Difficult to recruit and maintain quality staff
2. After School Programs
E.g. music, YMCA, Arts, Technology, Boys & Girls Club, Tutoring
No pros or cons recorded.
3. Transit/Park & Ride
Pro:
Convenient
Greenhouse reduction/fuel savings
Encourage transit use
School bus/funding
Con:
Safety around moving vehicles
4. Senior Citizen Center
Con:
Screening for student safety
5. Private Business or Non-Profit
E.g. Dental, Doctor's office, health care, social services
Pro:
Saves parents time
Convenience
Decrease school absences (for use of related services)
Encourage preventative care
Career opportunities
Easier connection with school and social services
Con:
Perceived client base limits abuse of services by students
Parking for customers
6. Multi-Purpose Indoor/Outdoor Fitness Sports Complex
Pro:
Encourage fitness
Community use/support
#1 priority for health department
Decrease obesity/increase activity
Afterschool availability/use
Con:
Coordination of Use
Liability issues
Space availability
Group 4:
1. Senior Center
Pros:
Ease of transportation
Builds community
Respect for elders
Prevent social isolation
Voting block
Possibility for meal services
Cons:
Separation of uses when noise is involved
Time management
Security
2. Social Services
Pros:
One stop shopping
Family planning
Reaching a broader population with health services
Convenience
Ease of dispensing medications to youth
Cons:
Youth exposed to troubled adults/youth
3. Boys & Girls Club:
Pros:
Proven commodity as youth service provider
Con:
Age separation
4. Religious Activities:
Pro:
Provide background in religion to all
Con:
Selecting a denomination/religion
5. Private Business Partnership:
Pros:
Financing maintenance/operations offset
Sponsorship of activities
Teach responsibility
Trade skills
Cons:
Capitalization of the schools
6. Library
Pros:
More books/better selection to students
Public computer access
Study Location
Cons:
School Noise
Competition for books/materials
7. Daycare
Pro:
Need for more daycare
Convenience
Early Learning Opportunity
8. Aquatic Facility/Sports Complex
Pro:
Availability to community
Con:
Cost
Voting Results
Proaram
Teen Center/Boys & Girls Club
Daycare/ Afterschool Care/Early
Childcare/Early Learning Center
Senior Center
Environmental Center
-Composting
-Earth Science
-Kitsap EZ Earth
-Food growing
Family Services
-Connection with social services
-Parenting Support
Multi-Use Activity/Sports Center
-Indoor/outdoor activities
Community Center
-Meeting
-Computers
-Activities
-Parent Room
Law Enforcement Space
-Connection between students and police
Private Business/Professional Services
-Restaurant
Public Health/Professional Services/
Medical Services
Transit Center/Park & Ride
Non-Profit Space
Adult Education Services
-Connection with Olympic College
Residential Housing
Performing Arts Center
-Center for all Arts
Pool
Religious Activities
Library
Symphony Practice Space
Votes
19
11
10
9
8
8
7
5
5
3
2
2
o
o
o
o
N;\121-0B022\200\2 -200-Qptions\A206\A206b-WkShp2MeetingNotes-OBOB1B.doc
Appendix 3:
Workshop 3 Agenda + Minutes
I 57
~~~IARCHITECTURE
~~~IARCHITECTURE
Bremerton Co-location Project
Stakeholders Workshop # 3
Site and Concept Evaluation
September 22, 2008
Agenda
4:30 - 4:45
Arrival, get name tag, find your table
4:45 - 4:50
Welcome and introductions
4:50 - 4:55
Explanation of the process
4:55 - 5:15
Review results from the last session
5: 15 - 5:30
Components of this project
5:30 - 5:55
Review representative evaluation sites
National talent/
local focus
5:30 - 5:40
Sites considered - comments
5:40 - 5:55
Site analysis of representational sites - comments
5:55 - 6: 15
Site concepts
6:15 - 6:25
Review goals and co-location reasons and other criteria
6:25 - 6:55
Identify pros and cons of site concepts
6:55 - 7: 15
Summary of site concept feedback
7:15 - 7:20
Summary, next steps, next meeting time and date
N :\121-08022\200\2- 200-0ptions\A206\WkShp3Agenda.pdf
www.nacarchitecture.com
NAC Inc I 2201 Sixth Avenue, Suite 1405 I Seattle, Washington 98121-1847 IT: 206.441.4522 I F: 206.441.7917
~~c:IARCHITECTURE
Bremerton Collaborative School Siting/Co-Location Project
Stakeholders Workshop #3
September 22, 2008
Greg Stack of NAClArchitecture welcomed the group, asked new members to introduce
themselves, and introduced the agenda for the evening.
The prioritized uses generated in Workshop #2 were reviewed. Seven uses emerged as
clear frontrunners: Teen Center/Boys & Girls Club (19 votes), Daycare/Afterschool
Care/Early Childcare/Early Learning Center (11), Senior Center (10), Environmental Center
(9), Family Services (8), Multi-Use Activity/Sports Center (8), and Community Center (7).
Kevin Flanagan of NAClArchitecture reported on the status of various related projects in
west Bremerton. He discussed this collocation project with representative from various
other community agencies including the Parks Department, YMCA, Boys and Girls Club,
United Way and the School District. The meetings with these various group included
discussions about initiatives that they are working on; he noted several correlations
between planned community initiatives and the prioritized needs identified by this group at
our last workshop. KCR and the School district are in the process of planning an early
learning / childcare center on Naval Avenue; and the United Way is consolidating into a
building downtown that will provide connection to community and health services, family
services as well as providing office space for non-profits. Based on these conversations it
National talent, appears that Early Childcare/Early Learning Center and Family Services needs will be met
local focus elsewhere in west Bremerton, so for the collocation project we will focus on the other top
priorities identified by the committee.
In looking at these priorities it is clear that their space requirements are very similar. For
instance, the requirements for a community center will be very similar to the requirements
for a teen center or a senior center. Based on this outcome the planning ideas presented
this evening will retain flexibility in the exact co-location use and focus on how these similar
uses would be accommodated on and typical urban and a suburban site.
Greg Stack reviewed the goals from Workshop #1:
1. Community pride, support revitalization of Bremerton
2. Part of a neighborhood center/support comprehensive plan
3. Create a great school/improve academic environment
4. Bring community together/expand opportunities
5. Project that gets broad support
6. Maximize capital, financially responsible
7. Efficient use of resources
8. Synergy of services working together
9. 360 degree service for students
10. Responds to population centers
11. Visible, public, central
www.nacarchitecture.com
NAC Inc I 2201 Sixth Avenue, Suite 1405 I Seattle, Washington 98121-1847 IT: 206.441.4522 I F: 206.441.7917
12. Environmentally sensitive
The components of a co-located middle school project were then reviewed with the group.
The various functions of a middle school account for approximately 91,000 square feet,
with the community uses totaling 5,000 square feet. Given these general space
requirements, the resultant building footprints were compared. The majority of spaces in a
suburban development would be on the ground level, resulting in a footprint of
approximately 75,000 s.f. For a more urban site, a three storey development was
proposed with a footprint of 54,000 s.f. In terms of acreage required for development, 9.7
acres was used as the minimum size for a site that would include two sports fields, parking,
bus drop-off, and the school itself. This 9.7 acre figure was used as a baseline when
evaluating potential representative sites.
Boris Srdar of NAClArchitecture presented various ways of orienting and sharing the
functions of a middle school and community/teen/senior center. Diagrams showed how
simultaneous uses could occur and how activities could be segregated from each other
when required.
Greg Stack then described the concept of representative sites. Since the scope of the
study is not to identify specific sites for the facility, the team looked at sites that were
representative of a variety of sites in two areas of west Bremerton. One group of sites is
more suburban in that they are west of highway 3, while the other sites are more towards
downtown. Using Highway 3 as a dividing line, three more urban sites were considered to
the east and three more suburban sites were considered to the west. The urban sites east
of the highway, while displaying diverse issues related to development, were commonly
close to facilities, parks, and residential development. Similarly, sites to the west shared
challenging topographies and limited access. A National Guard Armory site just east of
Pendergrast Park was chosen to be representative of suburban sites; and the Westpark
redevelopment was chosen to be representative of urban sites.
The team from NAClArchitecture then led an analysis of the various issues and
opportunities related to the selected representative sites. Simple diagrammatic building,
field, and parking layouts were shown to let people judge how the facilities would fit on the
sites. Since development on an urban site is more out of the realm of experience for most
people, character sketches to explain how the concept of the urban site could work were
also presented. A facility using approximately 30 acres was presented for the suburban
site. Two facilities requiring 9 and 6 acres, respectively, were presented for the urban site
with each using an adjacent park for part of their field requirement. These are referred to in
the comments below as options A and B.
The group was divided into three groups and asked to brainstorm pros and cons for each
site option as well as which option, in their opinions, would be most likely to garner wide
community support. Their responses were presented and are recorded below. The three
groups had similar responses to the site options, and appeared to agree on the following
points:
· The suburban siting option does not meet the goals the group defined at the
beginning of the process.
· The urban sites better meets these goals.
· Urban Site A with more fields was preferred over Site B with fewer fields, but
people understood that final resolution on an urban site would depend on land
availability.
Prior to adjourning, the attendees were asked for their questions and comments and a
general discussion occurred. Comments from this discussion were as follows:
As a person who lives/has lived in more rural settings, I am initially inclined to favor
those kinds of sites because of their natural setting and the absence of "bad
influences" found in more urban environments.
o Also mentioned was the park land adjacent to the National Guard Armory
site and the inherent advantage of locating near and utilizing those
resources.
o This was followed by a brief discussion of the "suburban" site options
evaluated, and all of the sites considered had parks/field located nearby.
o The location of the school could have a positive impact on the surrounding
neighborhoods, and the areas around Pendergrast Park (as well as
Westpark) could use the benefit.
Klahowya Secondary School (7-12) was mentioned as an example of the type of
suburban development that should be avoided and the more suburban site
reminded people of this school. Some criticisms of Klahowya were:
o The facility was built on a site isolated from existing development and used
as a magnet to attract residential development to the area.
o The school lacks visible presence and does not contribute to a sense of
community as defined in the Goals.
o One participant mentioned that she would prefer that type of school for her
children because of the rural setting and availability of open space and
playfields.
o Also mentioned was the grade 7-12 format, which was undesirable due to
the potential "bad influence" of older students mixing with younger
students.
While discussing the urban sites, it was mentioned that including the middle school
project as part of the Westpark Redevelopment Master Plan was a unique
opportunity and should be pursued in the future.
Traffic impact of the suburban site near Pendergrast Park was discussed. The
main road leading to the site was not thought to be able to accommodate the
additional traffic a school would create. Mitigating the traffic impact through
infrastructure improvements was mentioned. It was also pointed out that there
would be traffic impacts at the urban site as well.
Impacts on district bussing costs were questioned. It was noted that it is difficult to
project the relative bussing costs of suburban vs. urban sites because the district
would have to generally rearrange their routes and schedules to accommodate a
new school. This question was left unresolved, but a school representative
indicated that some ballpark figures may be made available.
The desire to see the geographic distribution of middle-school aged children was
reintroduced (this was also raised at the beginning of the workshop). This question
was also left unresolved, but it was mentioned that that kind of information would
be more appropriate and informative when considering actual sites instead of
representative examples.
A participant mentioned the increased likelihood of casual engagement with a
facility/service in an urban setting compared to the concerted effort it takes to utilize
the same service in a remote location.
Concern was raised as to whether enough people knew what was going on in this
study and that comments from a broad cross section of citizens are heard. It was
noted that the next steps ought to be taking the conclusions of this committee to a
broader audience at schools, community centers and through public meetings to
get additional input.
Concern was expressed as to whether the same conclusions would be reached if
the choices the group considered were put to a larger and more diverse section of
the community.
Pros and Cons of Site Options:
Group #1 :
Pro Con
More fields No sites that large are available
Easier construction Increased cost for landscape maintenance
Synergy with Parks & Recreation Further away from customers
More design flexibility Increased bussing costs
Land is less expensive Proximity to recreational areas
Plenty of parking space Less likely to have utilities in place
Can't walk to it
Does not bring community together
Suburban Site
Urban Sites
Pro Con
Part of a neiqhborhood; community pride Limited field space
Users can walk to community center Increased cost for multistory buildinq
Co-location increases use Limited parking
Likelihood of qreater services Needs the nearby park to work
Infrastructure already in place Underground parking creates a security
concern
More buildinq sites available Are seniors and kids too close?
Greater opportunity to integrate adults and
kids
More efficient use of land
Safer for after school activities
Multi-story - better line of site
Less cost for landscaping
Less cost for bussinq.
Group #2:
Suburban Site
Pro
A number of different fields
Facility More disconnected (sense of
ownershi et can comin Ie when wanted
Room for More Growth
Surrounding green spaces for
environmental education
Land is less expensive - easier/more
traditional school set u .
Con
Lack of access/trans ortation issues
Walking leads to safety issues
La out- Parkin to fields; too reat a distance
Classroom location in relation to gym - takes
too Ion to walk between classes
Does not meet any of the goals.
Urban Site A
close to
I Track would be used by all; elderly walk
Pro Con
Small/Compact - less environmental Layout leads to concern for making trip
imoact. between classes
Separate entrances for each use but they Less outdoor space
still share common soace
Neiahborhood walk Takes away ootions for outside activity
Parkinq under field - aood use of space No track; overcrowdinq existina tracks.
Buses on street
Cut down on transportation; walk or take
city bus
Meets aoals
Urban Site B
Group #3:
Suburban Site
rowth
Con
Not art of a nei hborhood center
More kids would need to be bussed
Increased fuel costs
Practically invisible
services
Urban Sites
Pro
Walkin distance
Closer to nei hborhood
Easier to share
Meets oals 1 , 2 and 4
Uses existing streets.
Parking: 75% underground and 25% visible Less responsive to future growth
would be a referable arran ement
Below ground parking requires walking too
far for uick tri s.
Where do the ortables o?
So different from other schools people
would be unwilling to try - no broad
communit su ort.
Type of Project Most Likely To Garner Community Support:
Group #1 :
Urban site A or B likely to be most supported (too close)
Group #2:
Urban options A and B meet all goals
Suburban option does not meet goals
Community support greater for urban options
Group #3:
Like the suburban due to access to fields and outdoors
Practical - prefers less costly option
Parents drive cars to school to be involved; needs to be accessible and convenient.
Need safe, wide, level, non-slip walking paths and lighting for the walkways
Stop and go without having to park.
I want my kids to walk.
What percentage of absentee landlords vote on levies? Some raise rent each time
a levy passes.
N: \121-08022\200\2 -200-0ptions\A206\A206b-WkShp3MeetingNotes-080922.doc
,f... 'I' '11,
POSSIBLE ~
BUT LONGER ..
CONNECTION ..
TO THE PARK ...
...
-
...
.....
.,
...
....
...
......
-
-
-
~
:~
.....", ,;",.10',1"'"'",
.I-~'''''!~''~'
,
,l,I
. ~,
" #
i'
~'
,}.
,
;"\' ,
~\"\:'" ,,' \',
'\- .'
"', <,
~J; .
'<~~~
SOLAR',,;,,;j\i~, ,
EXPOSURE
t
,\\
'i/'.,
f
'~
J
J
~
J
t
1~
(~'
Suburban Site Analysis
~
Suburban Site Layout
t
.
- -..-'-,.-'.
SOLAR
, EXPOSURE
1.;8 ~;" .
SMALL SCAJE ..... .
RESI0ENTIAL
..
Urban Site Analysis
I I
I i
) it :,I.,,~' U
t ~, /!J~
\, Pi " r
i, \"....""- .
, '......', -~~'
\. ~~.
(\ ~~')~'>
\
\,
.
\
J'
~I
~t
.!1
i I
l~l 1
ill ill
~'11 ,;,
G! ~~1
,.J
1
, ~~
:? '.
I ~r ~
IJ l
"" J:
'.
'.
SITE SIZE
LARGE 9 ACRES
SMALL 8.3 ACRES
'e
I"
t~
19
!I
tl :
-, ,'1
't;
eli
t
Urban Site" A" Layout
, '.
r ---~JY If-- ~1
J ' Y" --................ . ~I
! 't lt3 :.1.1__
i, ~~/;'r.~/t . Q ,At ""-- ~
\ If/, : /, :--.. ~
f 'r
~ rit. '.
\ ,~'t'...;..:".
\ ~~:,,,,,,~
'"" 41'" .' /
\ J ~'~'?
\ ~
\"
'I'.
SITE SIZE
URBAN 5.88 ACRES
1~.1 It:
'~I '1-;
~J ~
.
I
I
t
i
!
1
,to
It
~l
I
i
1
:llJ ! i
'J ~ i I
"I ,. I I
~ "'
i~i j
'r! {,
!;ll;;
,J V
I:
!
J'
~:
.'
i;
:'~!
"
Urban Site "B"Layout
Appendix 4:
Workshop 4 Agenda + Minutes
171
~~<=IARCHITECTURE
~~(:IARCHITECTURE
Bremerton Co-location Project
Stakeholders Workshop # 4
Cost Model and Shared Use Planning
October 2ih , 2008
Agenda
5:30 - 5:40
5:40 - 5:45
5:45 - 5:50
5:50 - 6:00
6:00 - 6:15
6:15 - 6:30
National talent,
local focus
6:30 - 6:50
6:50 - 7:00
7:00- 7: 10
Arrival, get name tag, find a seat
Welcome and outline process for tonight
Review results from the last session
Present cost models to group
Q and A related to cost models
Present representative floor plans
Discuss how shared use may work
Small group break-out,
-Discuss how well plans support shared use of facility
-Should community functions be more integrated or more separate?
-How can more or different community functions be integrated?
Report back to full group
Summary, next steps, next meeting time and date
N: \121-08022\200\2 -200-0ptions\A206\A206b-WkShp4AgendaLtrHd-081027 .doc
www.nacarchitecture.com
NAC Inc I 2201 Sixth Avenue, Suite 1405 I Seattle, Washington 98121-1847 I T: 206.441.4522 I F: 206.441.7917
~~c=IARCHITECTURE
Bremerton Collaborative School Siting/Co-Location Project
Stakeholders Workshop #4
October 2ih, 2008
Location - Norm Dicks Building Council Chambers
1) Reviewed results and discussion from Workshop 3:
A. The group discussed the concept of a "representative site" as a real property in
Bremerton, but not necessarily "the" site that would be purchased for the project.
As a real site in forces the designers to consider real issues such as topography,
utilities, access, etc that will be different from site to site but need to be considered.
B. Two different representative sites were studied - a more suburban location and a
more urban location.
National talent,
local focus
C. Comments on the suburban location included: It is more likely to find a 20+ acre
parcel of land in suburban areas - this will allow for more fields and parking. It is
more common for School districts to build new schools as standalone facilities on
undeveloped land rather than redeveloping land in urban areas. People noted that
Klahowya in Central Kitsap is an example of this type of development and they
thought this school was very isolated, and not part of the community - this did not
align well with the goals identified in this Bremerton project.
D. Comments on the urban location included: In an urban area, the property size will
be smaller so there will be less field area and less parking. The building will likely
be 3 stories to accommodate a smaller foot print compared to a 2 story building in
the suburban area. There will need to be compromises to the amount of area for
fields and parking sizes. An urban location allows for shorter travel distance, it is
more accessible for community people using the non-school functions at the facility
and it is more of a visible part of the community. This sort of location met the
overall goals that where outlined by the committee for this project.
2) Reported back from joint school board and city council meeting.
A. NAC presented the status of the study to date to the City Council plus
representatives from the school district on 10/23/08. They had a number of
questions on the study and overall were pleased with progress and direction of
study.
3) Comparison of a other middle school sites
www.nacarchitecture.com
NAC Inc I 2201 Sixth Avenue, Suite 1405 I Seattle, Washington 98121-1847 I T: 206.441.4522 I F: 206.441.7917
A. Presented in a power point some examples of actual middle schools that are similar
to the development options discussed for Bremerton - a new middle school in
Puyallup and a new mid-high in Lake Stevens that both followed the more
traditional suburban 20+ acre site development. Madison middle school in Seattle
was an example of a school on a smaller urban site (8 acres).
4) Cost models
A. What is a Cost Model? A cost model is a way to anticipate the probable
construction cost based on average costs per square foot of similar building
types (for whole buildings) without using an actual design to quantify specific
materials.
B. Cost Model disclaimers: The cost model evaluations for this study were based
on the most current average construction cost for similar projects bid though
spring of 2008. Market factors playa significant role in construction cost. Over
the past 5 years, market conditions have been such that construction
escalation has exceeded 10% annually while the general inflation rate has
been less than 4%. Since the construction time line for this project is likely 4-5
years out, changes in the economy may have significant effects to the actual
construction costs. The cost model should be looked at from a basis of
relative comparison of the 2 options rather than a prediction for actual
dollar amounts.
C. This cost model evaluated building and development costs but did not address
land acquisition cost since the cost of real-estate can vary widely and is
dependent on a specific negotiated deal.
D. Cost Model basis for 2 comparative developments: 2 separate cost models
were prepared for this project - one based on a representative design on the
more urban site and one for the more suburban site. Some design
assumptions are made relative to each site:
i. An urban site will likely be 3 stories; it is based on 10 acres in an area with
utilities available at the site. It will have 2 play fields and a track, and -100
on-site parking stalls.
ii. The suburban site is likely 2 stories; it is based on 20+ acres and located in
an area where utilities are - ~ mile from site. It will have 3 play fields and -
130 parking.
iii. The cost model assumes building of an identical size, quality and
construction type. The size basis is 105,000 SF for the combined middle
school and community use program.
E. Cost Model conclusions:
i. The net cost of the urban site calculates to be slightly less (about 2%) than
the suburban site. In considering the broad variables that could affect the cost,
the 2% difference could be considered nominal. Factors that influenced the
costs were:
ii. The building only cost for the 3 story building (for the more compact urban
site) is about 1 % more than the cost of the 2 story building due to the added
steel used for the structure.
iii. The cost to develop the suburban site is expected to be about 20% higher
than the urban site, because the suburban site affects more area; it has an
additional play field plus more parking. The suburban site is also expected to
need more cost to bring utilities to the site.
5) Question and answer / comment period followed the cost model (response in italics)
A. Y2 mile does not seem very far for bringing utilities to the suburban site - is
that a good basis? This number was a very rough estimation and could vary
widely depending on the actual site that may be purchased.
B. Is there an operational cost difference between the 2 sites? The operational
cost was not evaluated in this study though it would be reasonable to estimate
that caring for a smaller property and 2 fields will cost less than a larger
property with 3 fields.
C. Is there a difference in energy performance between a 2 story and 3 story
building? A 3 story building will generally perform slightly better for energy
efficiency than an equivalent 1 or 2 story building since there is reduced roof
area and building perimeter.
D. Is there a difference in carbon footprint between rural and suburban? This was
not evaluated directly, but an assumption is that there are significantly shorter
travel distances on average to an urban location, also more opportunity for
walking, biking and mass transit This is in addition to the expected increased
efficiency in the building noted above.
6) Small group break-out,
A. Discuss how well the plans support shared use of facility
i. Volunteers are nearby to assist school
ii. Economy is declining so there is an increased need for services
iii. School district might be liable if tenants / collocation partner defaults
B. Should shared use be more attached or detached with school?
i. Attached allows better interaction
ii. Attached is easier to share spaces
iii. Detached may cost more
iv. Detached allows better safety / security
v. Detached can ease scheduling issues / reduced disruptions
vi. Attached makes it more closely identified with the school
vii. Detached allows for a more clear identity for the community group
viii. Detached has concern that it may look like an afterthought
ix. Detached would need covered walk to connect to hared school spaces
x. It really depends on what community function shares the space.
C. Does cost information change any preference on suburban vs. urban?
i. Urban still preferred if cost is about equal
ii. Regardless of cost, it seems a waste to put it far away from most of the
population
iii. The carbon footprint factor is a "cost" that goes beyond the direct dollar
expense that makes the Urban site even more appealing
7) Next steps: Get the word out - where / how?
A. NAC will create visual boards and talking points
B. Committee needs to take on role of key communicators to talk to the public to
get broader feedback.
C. Go to head start group, boys and girls club, retirement centers, rood lifeline,
housing coalition, School PTA.
D. Boards to be set up at schools (during teacher conferences and at concerts
etc.)
E. Set joint meeting with School Board and city Council for follow up / de -brief
F. Write a letter to the editor of Kitsap sun (less than 200 words)
G. Request feed back to district and city web sites
N: \121-08022\200\2 -200-0ptions\A206\A206b-WkShp4MeetingNotes-081027 .doc
Appendix SA:
Original Project Schedule
177
~~~IARCHITECTURE
NAC I A R (H IT E (TO R E
Bremerton Co-location Project
Workshops and Meetings
Dates Subject Time
July 31,2008 Workshop 1 0 Goal Setting 3 Hrs
August 18, 2008 Workshop 2 0 Co-location Opportunities 3 Hrs
Sept 22, 2008 Workshop 3 0 Site & Concept Evaluation 3 Hrs
National talent,
local focus Mid October Workshop 4 0 Option Cost Analysis 2 Hrs
Early November Workshop 5 0 Discuss Draft Report 2 Hrs
Early December Present Report TBD
N:\ 121-08022\2001Z-200-0plionsIA206lA206b-MeetlngSchedule-080827.doc
www.nacarchitecture.com
NAC Inc 12201 Sixth Avenue, Suite 14051 Seattle, Washington 98121-18471 T: 206.441.45221 F: 206.441.7917
Appendix 58:
Co-location Project Examples
I 81