HomeMy WebLinkAbout4828 Contract Number 4828
Vendor PARAMETRIX INC
Sub7ect Consultant - Gorst Sewerage Pro�ect
Department Engineering
File Class LEG 12-1
Begin Date 6/5/2009
End Date
Review Date
Vault Date
Comments Amendment #1-8/09 #2-11/09 #3-12/09 #4-1/11
D ���0 d�
AMENDMENT NO 4 �AN 2 5 2�11 G��
TO J
PROFESSIONAL SERVICES AGREEMENT B y �
FOR
GORST SEWERAGE DESIGN PROJECT
The City of Bremerton, Washington (the' City') and Parametnx ( Consultant ) have entered into
a PROFESSIONAL SERVICES AGREEMENT for the Gorst Sewerage Design Pro�ect
This AMENDMENT NO 4 modifies the Scope of Work and Budget set forth in the AGREEMENT
Dated June 5 2009 and as amended on July 3� 2�09 (Amendment No 1), November 23 2009
(Amendment No 2) and December 22 2009 (Amendment No 3) as outlined in the attached
Exhibit A
The compensation for services shall be increased by $39 806 and the total fees under this
Agreement shall not exceed $944 884
Except as herein modified, the terms of the AGREEMENT shall remain in full force and effect
In WITNESS WHEREOF, the parties hereto have executed the AMENDMENT NO 4 to the
Professional Services Agreement the date and year mdicated
For Parametnx, dated this 25'�� day off� 2011
, . By c � �
For the Ciry of Bremerton dated this a��' day of.�fYNu.sE2�011
/
By
Patty Len a or
DEPARTME LAP ROVAL
w
Vincent Akhimie Director of Public Works and Utilities
A TO F
Ci ttomey
R�EIVED F R FI IN �
/
L Carol Etg n City le
I Exhibit A
�
i
iNO1MG8RIM0 PLCHNIMO HNVIRONMlMTGL 8C10NC8B
1660IQiSAP WAY SUITE A
HRBMHATON WA9B312
7 760377A031 P I60/995961
wmvpa�vmevis.cmv
December 13, 2010
PMXNo 236-1896-085 �
� Mr Tom Knuckey, P E
I C�ty of Bremerton
I 3027 Olympus Drrve
� Bremerton, WA 98310
Re Gorst Sewerage Pro�ect
REVISED ConsWCGon Support Serv�ces Amendment
Dear Tom
i
I Parametr�x is neanng complet�on of the cngmeenng services for the des�gn end constntct�on of the Gorst
Sewerage pro�cct Dunng the course of the pro�ect, we have utcurred costs for servwes beyond those anhcipated
I m the scope of work as amended The followmg is a listmg of the contract value (mcludmg amendments)
I
Contract and Amendment Summary
( C D ate Amount Accumulative
IniUal 6/05/2009 $825 000 $825 000
Amendment 1(ferms Only) 8/15/2009 $0 $625 000
� Amendment 2 71/23l2009 $98 078 $723 078
Amendment 3 12/22/2009 $182 000 $905 078
1
I • Phase 1 was for eddit�onal start-up
� • Phase 2 was for dcsign
I a Amendment 1 was to rev�se the mdemmficat�on clause m tha Parametnx contract
a Amendment 2 was for add�t�onal des�gn serv�ces
• Phase 3 was for construchon sernces and author�zed by Amendment 3 to the design contract (see
Item A)
� Durmg the construct�on phase, Pazameu�x has been requested by the C�ry to prov�de serv�ces that are outs�de of
� the scope of work set forth �n Amendment 3 Th�s addit�onal work �s summar�zed m attachment Item B m the
I amount of $39,806 48
I
�
f '
' � r
�
i _ __
� Exh�b�t A Mr Tom Knuckey, P E
� December 13, 2010
Page 2
�
I Parametnx �s hereby requestmg an add�honal amendment to our contract for these out of scope serv�ces prov�ded
� durmg construcGon Please advise �f queshons or we need to provide addRwnal mfortnatwn
Smcerely,
PARAMETRIX
r
�
i Bnan E Bunker, P E
� Prmcipal
BEB ak
Enclosure
cc Pro�ect File
�
i
i
�
�
f
I
I
j
1
�
i
�
�
I
Exh�bit A
CITY OP BREMERTON —(.()RST S�WERAGF PRWFCI'
BRFAKDOWM1 OF ADDI'IIONAL FrCINEFRING B SURVFYINf SFRVICFS DURING CONSTRUCTION
EFFORT FROM IANUARY 1.2010 THRU OClORFR 31.2010
No Isaoe Woric Performed Authonratlon/I er T�me Pnme A ros Cast
1 Aggrtgam Pm Ceorduwuon SewW coecema amx (mm ihc IleywaN Bekv nubmit0l enA Nc�r progms xiN vumlhn6 the p¢rs P�om canverselion wnh Bill Dev¢ Concems xiN Hayward FsMwry EI 011 ]9
Daman s Mon to help B�0 rtsolvc usues wn+mo�e �hm mUapatM The IocaUOns of Iha p�cs a� SD� w<rt Baker and then crn�swnwe q�praach pn vMunal
also �ev�sed Gue m �he rtloouau of SSMH A1 duc �u scwn/stam conllins ducowcd m"Old Gw Sho
i Smrmwac misimn a SBJ VauW eMxuoo wccmary of LYDAR wrvey W SDOT fmW commenn mM field d�s�overy ofodd p�pmg P6mie convcrseLOn wrth L�im mE Gmmm TnggaM by Febeua) 57 121 53
eb a"OldGimS uvedrtde� ofstmmxatncollMion cm. M'SOOiaMNedes� ouL
! Sexa rtvinan m 5&4 F¢Id Oucovery of �Ilen uwer uma canoen�on et gat smuan aquvrA el�nmmt chenge ofSSMH A I mid Pha�e converseuan x�th Lynn �nE G�mut 116cn sexer FeWuary I 57 193 85
n sewam58-0 Conswniondmw wpemued wfmM�onJ�uu�s
I SR J/Sem ChutnRenon uwcr crozsmg Rev�seA Nignmem m ovaid s�pul loops and rcGua Ne emount of ssphah m[oevion elong SRJ PrtperN Phooe conversobav wnh G�mmr Opponw�q �o rsduce �he tebruap 51 51136
exhLnfwWSDOTrtquntroopeneutmWxrycrossm& �nscdcrosvunionAaw�ngsrortOztfieW tonsmm�onnw.aofpro�ect
CondihauaMda chen
5 Sewertl�nmrntrtvisavmSharv� CirypolMidB"end J watereumsmrenfydcp�hs WatamamslouMmleshallow PM%rtv�xd PhamconvtrsauonwiOGmur Rcde�gnwa�nidNgher Febnvey�MarclJ f931362
Hcighb bsscmqi lo rtileci C�ry canmucfed 8 24 xazemum wa�c mab�CA Ne sewtt mum, m�d rtvittd 1he co�wn�oo cosh eM poa�ble ctuvge wM Apnl
cowwcuwidnwm Smv af oledma
6 DOE uwo xrvrtc crosswg c�Aibtta on Repvred uwcr umce e�ibns �o rc0<n sewer mn�n dcsi� chmiges and xatmnun clra'ennce venenw Wark mggertd by uxer ehgnmrn� cM1ange enA rtqurteA Febniury 51360 IJ
Shcrmen Hn uesL Ona e vcd PhIX rcnsed the sewn deud shecl rmuncc ua� fiom Ew
] Wuttmnm conl6a almg Wat Belfw Lacauw of 8" md 30 xatmnam nd per wLry bwe m C�ry As Bmll rtcordt PM%��shd wM Phone canverat�on wnh G�m�m Dvco�eey af xetemum May S) 6i1 M
Vall Rwd aaws 6om 50 3 devd �edesi wu Sun of u[dma oo�holed can0�n wrch cewcr Ime
8 Prtpersuon o(SB�4 R/lV �bibrt fw PM%me�Mmetkally cakWarcd Me lotanm of tM1e cut prnperty 6ne ot504 dong 5R7 p�epartd Wubit �M1�e come�vcwo wM Gwnar WSDOT cummrcd W� SB-I Mayllwm 52 a I4>+ (Ilillcd
N SDOT anA sraked Ne bca�ion m �he fidd ule �mOrovemenu wrn witM1m tFnr R/lV Cip desue to no� m Crry under TmA
collect WSDOT stmmwater runoR 08
9 Sexer ah�mm �enswns on SAerman Vmid ele�aJon of ebunOweE 8 waterLne nd psr ArBmlt PMX rcvxd �he uwer verticeLTwmm�tnl PM1one converse�ion wnh Cimnv Uixovery of xn¢'mum noM luty 512]4 9]
H<i u el eotlunvuidconllipwi�hld wetermvn Surve of oledata. afRRCYOSVn xunot C� AsBuill
10 CoMrucnonstakm a� caanm CauvuniansuWn ofcwbm rMes� EvCi PhonecanversW�mxvGBiIL 0.edesi ofcwbm Ci lul f?3528'!
11 Transanl Aval vs T(visim� e�al sis of �he ux e(ac<mams Wt senx Ne 3 e m uu�rnu W nnen omhorvrt�on m mid m� �cecd f3 S00 Au Se SS O8d 21
T(YI'AL 539,80648
Contract Number: 4828
Vendor: PARAMETRIX INC
Sub�ect: Consultant - Gorst Sewerage Pro�ect
Department: Engineering
File Class: LEG 12-1
Begin Date: 06/05/2009
End Date: 09/15/2010
Review Date: 09/O1/2010
Vault Date:
Comments: Amendment #1-8/09 #2-11/09 #3-12/09
Dates in original agreement to be verified by Lynn
Price. End date bumped to 2010 in the interim.
�
i
AMENDMENT NO 3
TO
PROFESSIONAL SERVICES AGREEMENT
FOR
GORST UGA SEWERAGE PROJECT
The City of Bremerton, Washington, (the "City"), and Parametnx, ("Consultant") have entered mto
a PROFESSIONAL SERVICES AGREEMENT for the pro�ect identified as the Gorst Sewerage
Pro�ect
This AMENDMENT NO 3 modifies the Scope of Work and Budget set forth m the AGREEMENT
dated June 5, 2009 and as amended on July 30, 2009 (Amendment No 1) and November 23,
2009 (Amendment No 2), as outlined in the attached Exhibit A
The Compensation for services shall be increased by $182,000 and the total fees under this
Agreement shall not exceed $905,078
�
Except as herem modified, the terms of the AGREEMENT shall remain in full force and effect
In WITNESS WHEREOF, the parties hereto have executed the AMENDMENT NO 3 to the
Professional Services Agreement the date and year indicated
For Parametrix, dated this �_ day of , 09 �
By
Diane Lernus
Its Vice President
,��l�
For the City of Bremerton, dated this a�d`�' day of ���,�/Y( e � ', 2009
B � �
Patty Len r
DEPARTMENT LAPPROVAL
L ' G � �,--
Phd Wdliams, Director of Public Works and Utdities
PP O RM
Ci ttorney
RECEIVED FOR FILING
Carol E en, City CI rk
I EXHIBIT A- SCOPE OF WORK/BUDGET
GORST SEWERAGE PROJECT
PROFESSIONAL SERVICES AGREEMENT
AMENDMENT NO. 3
�
The followmg summarizes addrtional professional services to provide support to the C�ty staff durmg the
biddmg construct�on phase of the pro�ect
ADMINISTRATIVE SUPPORT ,
Task 01 — Project Management and Document Control Support
• Attend meetmgs wrth the City staff related to coordination of the design wrth construction activrt�es
and ass�st wrth document admm�stration related to the Ecology and ARRA fundmg
• Proposed task budget is $5,000 00
Task 02 — Addenda Preparation and Conforming Documents
• Prepare addenda for both the pump stations and collection system bid documents based on Crty and
Bidder questions and mput Once the bids are opened, prepare a set of plans and specifications that
mcorporate the addenda changes mto a"conformed" bid document to be used durmg construchon
• Proposed task budget is $9,500 00
Task 03 Record Documents
• Followmg completion of all construction, prepare a set of plans and specifications that mcorporate
changes made durmg constructton The mput for the record documents shall be the contractors "Red
Lme" plans and the City Inspector's notes/records
• Proposed task budget �s $18,500 00
Task 04 — Permit Follow-up
• Assist wrth securmg permits required by the City or the Contractor to construct the pump stations
and the collector system
• Proposed budget is $7,500 00
Task 05 — RFI Responses
• Assist the Crty staff prepare responses to the Contractor or Vendor/Supplier "Request for
Information" (RFI)
• Proposed budget is $10,000 00
Task 06 — Submittal Reviews
• Provide engineermg review of the applicable submittals made by the contractor as required m the
respective specifications related to submittal documents.
• Proposed budget �s $50,000 00
Gorst UGA Sewerage Pro�ect
236-1896-085 1 November 2009
Task 07 — Meetings
• Panc��pate or attend meetmgs as requested by the City related to the construction of the facilrties It
, is anticipated that no more than 40 hours of the Parametnx team members effort will be required for
meetmgs
• Proposed budget is $5,000 00
FIELD SUPPORT
Task 08 — Survey
• Usmg the primary srte control established dunng design, stake the manholes mcludmg mvert
elevations, lateral subs and clean outs, required locations of structure at the pump stahons, and as-
constructed survey support City is to secure all applicable r�ght-of-entry for survey work on private
property
• Proposed budget is $60,500 00
Task 09— Special Inspection Service
• As set forth m Sect�on 02340 of the pump stat�on specifications, AMEC will provide the engmeenng
review of the design and mstallation of the Aggregate Piers at both pump stations The contractor
will be respons�ble for the actual system design and �r►stallation
• Proposed budget is $8,000 00
Task 10— Commissioning Support
• Provide support to City staff durmg the start up and commissionmg of the pump stations and grmder
pumps
• Proposed budget is $8,000 00
PROPOSED BUDGET
ADMINISTRATIVE SUPPORT
Task O1 Pro�ect Management and Document Control Support $5,000 00
Task 02 Addenda Preparat�on and Conformmg Documents $9,500 00
Task 03 Records Documents $18,500 00
Task 04 Permrt Follow-up $7,500 00
Task OS RFI Responses $10,000 00
Task 06 Submittal Reviews $50,000 00
Task 07 Meetmgs $5,000 00
Gorst UGA Sewerage Pro�ect
236-1896-085 2 November 2009
FIELD SUPPORT
Task 08 Survey $60,500 00
Task 09 Special Inspection Serv�ces $8,000 00
Task 10 Commissiomng Services � $8,000 00
TOTAL............................................................................................... $182,000.00
Gorst UGA Sewerage Pro�ect
236-1896-085 3 November 2009
Contract Number: 4828
Vendor: PARAMETRIX INC
Subject: Consultant - Gorst Sewerage Project
Department: Engineering
File Class: LEG 12-1
Begin Date: 06/05/2009
End Date: 09/15/2009
Review Date: 05/O1j2010
Vault Date:
Comments: Amendment #1-8/09 #2-11/09 #3-12/09
Dates in agreement to be verified by Lynn Price
'. ;
1 _
�
,.
AMENDMENT NO. 2
TO
PROFESSIONAL SERVICES AGREEMENT
FOR
GORST UGA SEWERAGE PROJECT
The City of Bremerton, Washington, (the "City"), and Parametrix, ("Consultant") have entered into
a PROFESSIONAL SERVICES AGREEMENT for the project identified as the Gorst Sewerage
Project.
This AMENDMENT NO. 2 modifies the Scope of Work and Budget set forth in the AGREEMENT
dated June 5, 2009, as outlined in the attached Exhibit A:
The Compensation for services shall be increased by $98,078 and the total fees under this
Agreement shall not exceed $723,078.
Except as herein modified, the terms of the AGREEMENT shall remain in full force and effect.
In WITNESS WHEREOF, the parties hereto have executed the AMENDMENT NO. 2 to the
Professional Services Agreement the date and year indicated.
For Parametrix, dated this �_ day of 1/ 00 .
By:
i
Diane Le ius
Its:Vice P side
For the City of Bremerton, dated this;� day of�Jq,�� , 2009.
c L
By: ,
Cecil McConnell, yor Pro Tem
D ENTAL APPROVAL:
. ,
Phil William r of Public Works and Utilities
PP AS TO FORM:
orne
ECEIVED FO ILI
�
` arol Etgen ' CI rk
.�
EXHIBIT �► -SCOPE OF WORI�C//BUDGET
GORST SEVNEiZAGE PROJECI'
PROFESSIONAL SERVICES �►GREEiV1EIVT
AMENDIVIENT NO. 2
The following summarizes additional services provided by the Parametrix team to complete the design and
bid documents for the Gorst UGA Sewerage project.
Task 1 — Project Management
o Changes to the pump station design including discharge to the existing force mains; changing the
concept from a"package plant" to a more "complete" stand alone design; modifications to the
emergency generator concept; and re-evaluating concepts for connecting the collection system into
the pump station resulted in an increase of the design effort and overall management of the project
by �IDR. �
o The budget increase is $2,789.00.
Task 5 — Geotechnical Services
0 Aciditional geotechnical work by AMEC was required beyond the initial scope of work including:
transmissivity "slug test" for groundwater; evaluations of geotechnical conditions at test pits
excavated by City crews; analysis of ground improvements and liquefaction.
o The budget increase is $15,600.00.
Task 7 — Permitting
o Subsequent to the project initiative, the State determined that a Cultural Resources Assessment
would have to be prepared to meet federal regulations. A subcontract was entered into by Parametrix
with Cultural Resources Consultants (CRC) to complete the assessment under a tight time frame.
o The budget increase is $4,075.00.
,
Task 11 — Pump Station Design
o Changes to the pump station design including discharge to the existing force mains; changing the
concept from a"package plant" to a more �"complete" stand alone design; modifications to the
emergency generator concept; and re-evaluating concepts for connecting the collection system into
the pump station resulted in an increase of the design effort.
o The budget increase is $52,401.00.
Task 14 — QA/QC
o Due to the extra work on the pump station design, additional QA/QC was required.
o The budget increase is $1,310.00.
Additional�Task — Landscape Design
o The County Administrative Conditional Use Permit (ACUP) required a formal landscape plan for
approval as a part of the ACUP for both pump stations.
Gorst UGA Seiverage Project
236-1896-085 1 November 2009
I
• The budget increase is $7,700.00.
Additional Task — Constructibility Review
o At the City's request, HDR performed a constructibility review including meetings on means to
reduce construction costs.
m The budget increase for the Constructibility Review is $6,800.00.
Additional Task — Surge Analysis
, • The budget increase for the Surge Analysis is $7,403.00.
BUDGET
Task 1 Project Management ......................................................................................................... $2,789
Task 5 Geotechnical Services .................................................................................................... $15,600
Task Permitting ......................................................................................................................... $4,075
Task Pump Station Design ...................................................................................................... $52,401
Task QA/QC ............................................................................................................................. $1,310
Additional Task Landscaping Design .................................................................................................. $7,700
Additional Task Constructibility Review ............................................................................................ $6,800
- Additional Task Surge Analysis .......................................................................................................... $7,403
TOTAL ...................................................................................................... $98,078
�
Gorst UGA Sewerage Project
236-1896-085 2 November 2009
Contract Number:
Vendor:-
Subject:
Department:
File Class:
Begin Date:
End Date:
Review Date:
Vault Date:
Comments:
4828
PARAME'l'RIX INC
Consultant - Gorst Sewerage Project
Engineering
LEG 12-1
06/05/2009
09/15/2009
09/01/2009
Amendment #1-8/09
AMENDMENT NO.1
TO
PROFESSIONAL SERVICES AGREEMENT
FOR
GORST SEWERAGE DESIGN PROJECT
The City of Bremerton, Washington, (the "City"), and Parametrix, ("Consultant") have entered into
a PROFESSIONAL SERVICES AGREEMENT for the Gorst Sewerage Design Project.
This AMENDMENT NO.1 replaces Paragraph V. "Indemnification" of the Professional Services
Agreement as set forth in the AGREEMENT dated June 5, 2009, with the following:
"Consultant shall, at all times, be solely responsible for the negligent or wrongful acts or failures to
act of its personnel, subconsultants and agents which arise in any way out of the performance of
this Agreement. Consultant agrees to defend, indemnify, and hold harmless the City and its
appointed and elected officials and employees from and against any and all liability, loss, costs,
damage, and expense, including costs and attorney fees in defense thereof, because of actions,
claims, or lawsuits for damages resulting from personal or bodily injury, including death any time
resulting therefrom, sustained by any person or persons, and on account of damage to property,
to the extent arising out of the willful misconduct or negligent performance of the Agreement, if
such injuries to persons or damage to property is due to the willful or negligent act or omission of
the Consultant, its subconsultants, its agents, or assigns.
The City and Consultant have specifically negotiated Consultant's waiver of its immunity under
Title 51 RCW, which is herepy waived for purposes of Consultant's indemnification and hold
harmless of the City, including the duty to defend. This provision shall be inapplicable to the
extent such action, claim, or lawsuit is judicially found to arise from the acts or failures to act of the
City."
Except as herein modified, the terms of the AGREEMENT shall remain in full force and effect.
In WITNESS WHEREOF, the parties hereto have executed the AMENDMENT NO.1 to the
Professional Services Agreement the date and year indicated.
For Parametrix, dated this 30 day of -.J <.J L. V ,2009.
B~~
"....~
I _ ,-.
For the City of Bremerton, dated this 3 0 ~ day of .j tAIl ' 2009. _ '"
By ~1~" ~1//
Cecil McConnell, Mayor Pro Tem'
L:
/Vl./)
Contract Number:
Vendor:
Subject:
Department:
File Class:
Begin Date:
End Date:
Review Date:
Vault Date:
Comments:
4828
PARAMETRIX INC
Consultant - Gorst Sewerage Project
Engineering
LEG 12-1
06/05/2009
09/15/2009
09/01/2009
,
.
PROFESSIONAL SERVICES AGREEMENT
Gorst UGA Sewerage Project
Contract with Parametrix
The City of Bremerton ("City") and Parametrix, Inc., ("Consultant"), referred to
collectively as the "Parties," enter into the following Agreement for professional services:
I. Scope: The Consultant agrees to perform the services more specifically described in the
Scope of Work attached hereto as Exhibit A, which is incorporated by reference herein. The
Scope of Work may be modified only pursuant to Section VII.G. of this Agreement. If the Scope
of Work provides for unspecified additional services such services shall only be performed upon
the express written request of the City. Consultant further represents that the services furnished
under this Agreement will be performed in accordance with generally accepted professional
practices in effect at the time such services are performed.
II. Term: The City and the Consultant agree that work will begin on the tasks described in
Exhibit A immediately upon execution of this Agreement. The parties agree that the work
described in Exhibit A is to be completed as provided for in the work schedule Exhibit B;
provided however, that additional time shall be granted by the City for excusable delays or extra
work as provided for in section IX (A) of this agreement.
III. Compensation: In consideration of the services provided pursuant to this Agreement, the
City shall pay Consultant in an amount not to exceed $625,000. Consultant's charges and bills
shall conform to the fee schedule attached hereto as Exhibit C and incorporated herein by this
reference.
The Consultant shall submit regular billing statements detailing work performed and
amount charged on each task or portion thereof. The descriptions shall conform to and fall
within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a
conforming billing statement, the City shall promptly process payment. PROVIDED,
HOWEVER, the City reserves the right to prioritize scoped work and accelerate and/or delay
work tasks under the time frame set forth in Section II herein. The Consultant's labor rates and
billing fees shall be as delineated in Exhibit C.
Consultant shall not perform work beyond the Scope of Work, nor shall be compensated
for such work, unless the Scope of Work or amount of compensation is modified pursuant to this
Agreement. Consultant shall only be compensated for additional services if requested pursuant
to Section I and, if not otherwise provided, such compensation shall be in accordance with
Exhibit C.
If a billing statement does not conform to this Agreement, the City may withhold
payment until the statement is brought into compliance. Such withholding does not relieve
Consultant of its obligations under this Agreement.
Bremerton/Parametrix
Gorst UGA Sewerage Proiect
Page 1 of6
IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed
in the Scope of Work and is performing independent functions and responsibilities within its
field of expertise. Consultant and its personnel are independent Consultants and not employees
of the City. Consultant and its personnel have no authority to bind the City or to control the
City's employees and other Consultants. None of the benefits provided by the City to its
employees, including, but not limited to, compensation, insurance, and unemployment insurance
are available from the City to the employees, agents, representatives, or sub-Consultants of the
Consultant. Consultant will be solely and entirely responsible for its acts and for the acts of
Consultant's agents, employees, representatives and sub-Consultants during the performance of
this Agreement. The City may, during the term of this Agreement, engage other independent
Consultants to perform the same or similar work.
As an independent Consultant, Consultant is responsible for its own management. The
City's administration and enforcement of this Agreement shall not be deemed an exercise of
managerial control over Consultant or its personnel.
As an independent Consultant, Consultant is responsible for payment of all taxes and
licensing fees necessary to perform its obligations under this Agreement. These taxes and fees
include but are not limited to State industrial insurance, Business & Occupation, State
professional licensing, and City business licensing. If any taxes or fees due the City have been
declared delinquent, the City may withhold the delinquent amount, plus any additional charges
arising from the delinquency, from any payments due Consultant.
V. Indemnification: Consultant shall defend, indemnify and hold the City, its officers,
officials, employees, agents and volunteers harmless from any and all claims, injuries, damages,
losses or suits, including all legal costs and attorney fees, arising out of or in connection with the
performance of this Agreement, except for that portion of the injuries and damages caused by the
City's sole negligence.
The City's review or acceptance of any of the work when completed shall not be grounds
to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this Agreement is subject to
RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons
or damages to property caused by or resulting from the concurrent negligence of the Consultant
and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability
hereunder shall be only to the extent of the Consultant's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S
WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY
FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER
ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration or termination of this Agreement.
Bremerton/Parametrix
Gorst UGA Sewerage Proiect
Page 2 of6
.,
VI. Insurance: The Consultant shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which may arise from or in
connection with the performance of the work hereunder by the Consultant, its agents,
representatives, employees, or sub-Consultants.
Before beginning work on the project described in this Agreement, the Consultant shall
provide a Certificate of Insurance evidencing:
1. Automobile Liabilitv insurance with limits no less than $1,000,000 combined single
limit per accident for bodily injury and property damage; and
2. Commercial General Liabilitv insurance written on an occurrence basis with limits no
less than $1,000,000 combined single limit per occurrence and general aggregate for
personal injury, bodily injury and property damage. Coverage shall include but not be
limited to: blanket contractual; products/completed operations/broad form property
damage; explosion, collapse and underground (XCD) if applicable; and employer's
liability; and
3. Excess Liability insurance with limits not less than 1,000,000 limit per occurrence and
aggregate.
4. Professional Liabilitv insurance with limits no less than $1,000,000 limit per
occurrence/claim.
Any payment of deductible or self insured retention shall be the sole responsibility of the
Consultant.
All required policies shall be provided on an "occurrence" basis except professional
liability insurance (if required), which may be provided on a "claims-made" basis.
The City shall be named as an additional insured on the Commercial General Liability
insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an
endorsement that is acceptable to the City, which names the City as an additional insured shall be
attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of
all the required insurance policies and endorsements. The City further reserves the right to reject
any unacceptable policies and/or endorsements..
The Consultant's Commercial General Liability insurance shall contain a clause stating
that coverage shall apply separately to each insured against whom claim is made or suit is
brought, except with respects to the limits of the insurer's liability.
The Consultant's insurance shall be primary insurance as respects the City and the City
shall be given thirty (30) days prior written notice by certified mail, return receipt requested, of
any cancellation, suspension or material change in coverage.
The City also reserves its unqualified right to require at any time and for any reason,
proof of coverage in the form of a duplicate of the insurance policy with all endorsements as
evidence of coverage.
Bremerton/Parametrix
Gorst UGA Sewerage Proiect
Page 3 of6
VII. General Conditions:
A. Reports and Information: When requested by the City, Consultant shall furnish
periodic reports and documents on matters covered by this Agreement. The reports and
documents shall be furnished in the time and form requested. Consultant shall maintain
accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to
substantiate all billed amounts.
B. Ownership and Use of Records and Documents: Original documents, drawings,
designs and reports, including those in electronic format, developed under this Agreement are the
property of the City. All written information submitted by the City to the Consultant in
connection with the services performed by the Consultant under this Agreement will be
safeguarded by the Consultant to at least the same extent as the Consultant safeguards like
information relating to its own business. If such information is publicly available or is already in
Consultant's possession or known to it, or is rightfully obtained by the Consultant from third
parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise.
All data, documents and files created by Consultant under this Agreement may be stored
at Consultant's office in Bremerton, Washington. Consultant shall make such data, documents,
and files available to the City upon its request at all reasonable times for the purpose of editing,
modifying and updating as necessary until such time as the City is capable of storing such
information in the City's offices. Duplicate copies of this information shall be provided to the
City upon its request, and at reasonable cost.
All documents, including all reports, drawings, specifications, computer software'or other
items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service
with respect to the project and are the property of the City. Any reuse by the City for other than
the specific purpose intended will be at City's sole risk.
C. Work Performed at Consultant's Risk: Consultant shall take all precautions necessary
and shall be responsible for the safety of its employees, agents, and sub-consultants in the
performance of the work hereunder and shall utilize all protection necessary for that purpose.
All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss
of or damage to materials, tools, or other articles used or held for use in connection with the
work.
D. Place of Work: The Consultant shall perform the work authorized under this
Agreement at its offices in Bremerton, Washington. Meetings with the City staff as described in
Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed
upon by the parties.
E. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement
between the Parties, and the Parties acknowledge that there are no other agreements, written or
oral, that have not been set forth in the text of this Agreement.
Bremerton/Parametrix
Gorst UGA Sewerage Proiect
Page 4 of6
F. Severability: Should any part of this Agreement be found void, the balance of the
Agreement shall remain in full force and effect.
G. Modification: This Agreement may only be modified by written instrument signed by
both Parties.
H. Written Notices: All communications regarding this Agreement shall be sent to the
parties at the addresses listed below by registered or 1 st class mail, or by personal service, and
shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement
or such other address as may be hereafter specified in writing.
City Address
100 Oyster Bay Avenue No.
Bremerton, W A 98312
Consultant Address
4660 Kitsap Way, Suite A
Bremerton, W A 98312
I. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a
waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be
deemed waiver of any other right or power.
J. Non-Waiver of Breach: The failure of the City to insist upon strict performance of any
of the covenants and agreements contained herein, or to exercise any option herein conferred in
one or more instances shall not be construed to be a waiver or relinquishment of said covenants,
agreements or options, and the same shall be and remain in full force and effect.
K. Compliance with Laws: Consultant shall comply with all applicable Federal, State,
and local laws in performing its obligations under this Agreement.
L. Choice of Law and Venue: This Agreement shall be interpreted according to the laws
of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement
shall be brought in Kitsap County Superior Court.
M. Attorneys' Fees: In the event of litigation to enforce any of the terms or provisions
herein, each party shall pay all its own costs and attorney's fees.
N. Assignment: Any assignment of this agreement by the Contractor without the written
consent of the City shall be void.
VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the
public on the basis of race, color, national origin, sex, religion, age, marital status, disability, or
sexual orientation except for employment actions based on bona fide occupational qualification.
IX. Termination: This Agreement shall remain in force until completion and acceptance of
the services, terminated by written instrument upon mutual consent, or by the City of Bremerton
for convenience. This Agreement may be immediately terminated for cause by a Party if the
other Party substantially fails to perform through no fault of the terminating Party, and the non-
performing Party does not commence correction of the failure of performance within thirty (30)
BremertonIParametrix
Gorst UGA Sewerage Proiect
Page 5 of6
days of the terminating Party's sending notice to the non-performing Party. Any Notice by
Consultant shall include a report showing the status of all items listed in the Scope of Work
current through the termination date.
If the City receives reimbursement by any federal, state, or other source for work described in
Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is
cancelled or substantially reduced after the execution date of this Agreement and prior to the
completion of the work, the City may summarily terminate this Agreement.
A. Excusable Delays: The right of Consultant to proceed shall not be terminated nor shall
Consultant be charged with liquidated damages for any delays in the completion of the work due
to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials,
equipment, tools, or labor by reason of war, national defense, or other national emergency; 2)
any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes
not reasonably foreseeable by the parties at the time of the execution of the Agreement that are
beyond the control and without the fault or negligence of the Consultant, including, but not
restricted to, acts of God, fires, floods, strikes, or weather of unusual severity. PROVIDED,
HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in
writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement,
the delay is properly excusable, the City shall, in writing, extend the time for completing the
work for a period oftime commensurate with the period of excusable delay.
B. Rights Upon Termination: In the event of termination, the City shall pay for all
services performed by the Consultant to the effective date of termination, as described on a final
invoice submitted to the City. After termination, the City may take possession of all records and
data within the Consultant's possession pertaining to this project which may be used by the City
without restriction. Any such use not related to the project which Consultant was contracted to
perform shall be without liability or legal.exposure to the Consultant.
BY:\~ {3()zefrlafj
its: Mayo
Date: (p Is' /09
I I
,'"
rS~LTANf J
,..~
By: Diane kenius
its:Vice President
Darfo;1 ~ 1DtJ9
At;J
~~/J{)
City Cle
R:\LEGAL\Contracts\FORMS\Professional Services Agreement Form (2003).doc
BremertonlParametrix
Gorst Sewerage Design
Page 6 of6
EXHIBIT A - SCOPE OF WORK
City of Bremerton
Gorst UGA Sewerage Project
INTRODUCTION
The Gorst area is unincorporated Kitsap County contiguous to the City of Bremerton. The existing Gorst
UGA area is currently on septic tanks with no sewer conveyance system or treatment. The area has been
determined to be a severe public health hazard by the Kitsap County Board of Health and the Washington
State Board of health, in 1997.
The Kitsap County Health District (KCHD) states, "The best long-term solution to protect public health
and improve water quality in the area is installing a public sewer collection system with conveyance to a
municipal treatment plant."
The City applied for grants and loans from the Washington State Water Pollution Control Revolving Fund
(SRF) through the Department of Ecology. The funding approved is as follows:
Seweraee Proiect
Recovery Act Funding
$3,620,213
$520,987
$568.350
Recovery Act Loan
Revolving Fund Loan
Total $4,709,550
Septic Replacement Proiect
Recovery Act Funding
$1,283,000
$110,000
Revolving Fund Loan
Total $1,393,000
The funding provisions require that the design be completed by September 17, 2009. The following
describes the engineering work to be performed to complete the proposed project.
PROJECT PHASES
The project will consist of two phases:
Phase 1 - Design and Bid Documents
Phase 2 - Construction Services
City of Bremer/on
Gors/ UGA Sewerage Project
Scope of Work
1
236-1896-085
May 2009
PHASE 01
DESIGN AND BID DOCUMENTS
TASK 01
PROJECT MANAGEMENT
Objective:
To plan, organize, direct, control, and communicate all relevant activities set forth in this
Scope of Work so as to complete the final design by September 17, 2009 within the
approved budget, and to assist with construction services as needed.
Approach:
Parametrix has selected a team of senior professionals to manage the work and lead the
pipe line design, pump station design, and the design necessary to connect the existing
buildings on septic systems to the new conveyance system. Communication will be on a
daily basis through email and telephone, and with weekly project coordination meetings
with the City and design team staff.
Deliverables: Work products will include:
. Project Management Plan.
. Concise subcontracts
. Meeting notes
. Weekly action agenda
. Summary of issues identified during a weekly project team meeting
. Monthly invoices and status reports
Assumptions: The following assumptions apply:
. Requests for decisions will be clearly stated and responded to in a timely manner.
. Decisions will be documented.
. Notes of meetings of importance will be prepared.
. A weekly action agenda will be updated and distributed.
. Monthly reports will be provided with timely invoices.
. Subconsu1tants will be responsive to meeting their assignments on time.
. Project related issues will be identified, communicated, and resolved.
TASK 02 PROJECT AND PUBLIC MEETINGS
Objective: To schedule and conduct effective project and public meetings as deemed appropriate by
the City.
Approach: To hold meetings only as necessary and develop agendas, meeting materials, and support
documentation, so as to make effective use of the participant's expertise and time.
Deliverables: Work products will include:
City of Bremerton
Garst UGA Sewerage Project
Scope of Work
2
23 6- J 896-085
May 2009
. Meeting agendas.
. Meeting notes
. Support material for meetings
Assumptions: The following assumptions apply:
. There will be regularly scheduled Project meetings over the course of the project (20
during design).
. There will be special meetings with the public property owners and agency personnel
as deemed appropriate by the City (15 during design).
. The City will conduct any public meetings with the Parametrix team in a supporting
role.
. The City will be responsible for scheduling and conducting meetings with individual
property owners with the Parametrix team in a supporting role.
TASK 03 PLANNING VERIFICATION I BASIS OF DESIGN
Objective: To verify the geographical area to be served and validate and modify the design
parameters set forth in the Facilities Plan in the form of a "Basis of Design" document.
Approach: Review the Facilities Plan and finalize the location of the pipelines and pump stations so
as to provide service to properties within the UGA in a practical and cost-effective
manner.
Deliverables: Work products will include:
. A basis of design document summarizing the design criteria and design parameters to
be met under both the collec~ion and pumping system, and the systems connecting the
private properties to the public system.
Assumptions: The following assumptions apply:
. The projected total flows in the UGA as set forth in the Facilities Plan are correct.
. The pipeline and pump station locations can be modified so as to best service the area.
. The final basis of design will be in compliance with the Grant/Loan conditions.
. Records of failed systems will be provided by KCHD
TASK 04 SURVEY AND MAPPING
Objective: To generate survey and mapping data for development ofCADD base maps.
Approach: The following approach applies:
. The City has authorized Parametrix to provide preliminary mapping and survey data.
City of Bremerton
Gorst UGA Sewerage Project
Scope of Work
3
236-1896-085
May 2009
· The City will contract with a local aerial survey service to fly the project area and
provide applicable electronic data for design.
. Parametrix field crews will augment the aerial survey as required.
· Basement/lower level floor elevations of critical locations based on City input will be
determined.
· Individual site maps will be prepared for private residential properties connecting their
homes to the system.
Deliverables: Electronic files for use in preparing design plans and identifying property boundaries.
Assumptions: The following assumptions apply:
· Parametrix survey will provide control.
· The City will provide as-builts of recent sewer and water projects that show right-of-
way.
· State highway and County property records and files are correct.
· 20 building basement/lower floor elevations will be determined
TASK 05 GEOTECHNICAL SERVICES
Objective: The following objectives will be met:
· To characterize soil conditions for pipeline and for two pump stations for design
purposes.
· To characterize rock conditions along West Sherman Heights Road.
· To evaluate soil conditions for pump station foundation design and re-use as backfill
for pipeline, excavation properties of rock, and determination of local groundwater
depth for dewatering purposes.
· Determine thickness, density, and fines content of subsurface soils for liquefaction
analysis purposes at pump stations.
Approach: The following approach applies:
· Review existing available explorations in the vicinity of the project alignment and
pump station locations.
· Advance seven borings (noting groundwater at time of drilling, no wells) at locations
along the pipeline, to a depth of 10 feet each.
· Advance two borings (noting groundwater at time of drilling, with 2-inch diameter
wells) at pump station locations to 35 feet each.
· Perform moisture content and grain size testing on representative samples.
City of Bremerton
Corst UCA Sewerage Project
Scope of Work
4
236-1896-085
May 2009
. Perform a seismic refraction survey along West Sherman Heights Road to determine
depth to rock and rock strength based on shear wave velocity.
. Additional borings to be completed for final design to fill gaps in areas underlain by
soil and to confirm results of seismic refraction survey in areas underlain by rock.
. Install monitoring wells at pump station locations
. Slug tests may be performed at a later date within monitoring wells for dewatering
design.
Deliverables: Geotechnical Technical Memorandum (review copy, and final copy)
Assumptions: The following assumptions apply:
. Boring locations are truck accessible and that soil cuttings can remain on site.
· Cuttings will be placed in drums at the pump station locations and transported to a
designated City of Bremerton storage area pending characterization for disposal.
. Parametrix will be responsible for coordinating access with property owners as
required and obtaining any necessary street use permits.
· Environmental sampling and testing will not be conducted In the event that
contaminated soils are encountered.
· Boreholes will be backfilled with a mixture of cuttings and bentonite.
· Parametrix will provide figure showing the location of the proposed pipeline and pump
stations in relation to existing site features.
· Borings will be located to avoi9 existing underground utilities.
· AMEC will call Dial B4UDig utility locating service prior to drilling, however,
assistance will be needed from Parametrix to identify locations of onsite utilities
· Traffic control will be necessary for certain boring locations and the seismic refraction
survey due to narrow shoulders.
TASK 06 UTILITY COORDINATION I RELOCATION
Objective: To identify existing utilities that might impact the design/construction of public and
private systems and develop plans to relocate them if practical to avoid conflicts during
construction.
Approach: The following approach applies:
· A private utility locate company will be contracted by the City to locate and mark
existing utilities.
· Parametrix surveys will supplement locations as applicable.
· As-buiIts for private and public utility companies will be obtained for the project area.
City of Bremerton
Gorst UGA Sewerage Project
Scope of Work
5
236-1896-085
May 2009
. "Existing utilities will be included as a "layer" in the CADD base map.
. Utilities need to be relocated by the respective utility companies prior to construction
of the sewer system proposed under the project.
. Pot holing will be performed at critical locations.
Deliverables: Work products will include:
. Utility layer in base CADD file.
. A relocation plan showing those utilities that conflict with the sewer construction.
Assumptions: The following assumptions apply:
. Field verification and supplemental surveying will be required.
. Pot holing may be necessary at up to 10 locations. (Excavation by others.)
. Utility relocation costs will be bome by the respective utility owners.
TASK 07 PERMITTING
Objective: To identify the required permits that must be acquired for construction of both the public
and private systems.
Approach: The following approach applies:
. Identify the permits needed to construct the facilities, requirements to obtain, and the
process/time required.
. Develop a permit management plan.
. Implement the plan so as to have the required permits at the time of bidding.
Deliverables: Work products will include:
. Permit management plan.
. Assistance with permit applications.
. Submit all permit applications prior to July 31, 2009.
. Applicable permit conditions articulated in the bid documents.
. Permits in hand prior to bidding.
Assumptions: The following assumptions apply:
. Agencies will be supportive of expediting the approval process.
. SEP AlNEP A and other environmental permit issues will not need to be addressed
beyond those already approved.
. Permit costs will be minimized due to the environmental benefits of the project.
City of Bremerton
Gorst UGA Sewerage Project
Scope of Work
6
236-1896-085
May 2009
TASK 08 CONSTRUCTION TRAFFIC CONTROL
Objective: To develop a Construction Traffic Control Plan that will allow the Contractor to perform
work in a safe manner acceptable to the permitting agency.
Approach: The following approach applies:
. Based on County and WSDOT standards, develop a specific Traffic Control Plan for
how the Contractor can perform work in the right-of-way safely.
Deliverables: Work products will include:
. Traffic Control Plans and specifications that are acceptable by WSDOT and Kitsap
County to be used during construction of the 90rst Sewer project.
Assumptions: The following assumptions apply:
. Follow WSDOT and County traffic control standards.
. Detours will be allowed.
. The State and County will establish hours of operations.
. The Contractor will finalize the plan and stamp the drawings to be used during
construction.
TASK 09 COST ESTIMATING
Objective: To prepare cost estimate at the 30%, 60%, and final design that reflect an accurate cost of
construction.
Approach: The following approach applies:
. To use historical construction costs for Bremerton and costs obtained through other
data sources, including vendors and suppliers, to develop detailed unit costs and total
costs by project elements.
Deliverables: Work products will include:
. A detailed cost estimate will be included with the design documents at the 30%, 90%,
and final submittal.
Assumptions: The following assumptions apply:
. The 30% estimate will include the Pump Stations based on best available information.
. The estimates will include contingency.
. The City will provide recent bid tabs from similar projects.
. There will not be an "independent" cost estimate.
City of Bremerton
Garst UGA Sewerage Project
Scope of Work
7
236-1896-085
May 2009
TASK 10 PIPELINE DESIGN (30%, 60% AND 100%)
Objective: To design the gravity and pressure pipeline system to serve the Gorst UGA as set forth in
the Final Facilities Plan and Basis of Design developed in Task 3, in compliance with
DOE requirements and terms of the City grants/loans.
Approach: The following approach applies:
. Establish alignments and profiles to serve the Gorst UGA based on survey data
developed in Task 4 and utility data obtained in Task 6.
. Size the pipes based on DOE standards and flow data established in the Basis of
Design, Task 3.
· Coordinate the pipeline design with the pump station locations and design, as well as
geotechnical conditions determined in Task 5.
· Establish the pipeline alignment and depths based on right-of-way constraints and
permit requirements.
· Develop 30% design documents and outline specifications for review.
· Develop 60% design documents and specifications for review. The 60% documents
will incorporate review comments from the 30% review.
· Develop final bid documents (plans and specifications) incorporating the 60% review
comments.
· Provide internal review and quality control of the work through the design and at the'
time of document submittal.
Deliverables: Work products will include:
· 30% drawings, outline specifications and preliminary cost estimates.
· 60% drawings, specifications, and Engineer's Opinion of Probable Cost (EOPC) (PDF
electronic copy).
· 100% drawings, specifications, and EOPC (pDF electronic copy).
. Anticipate a drawing set of 45 sheets.
· Bid set contract docume~ts (drawings and specifications); one full-size (22" x 34")
unbound signed drawing set; one half-size (11" x 17") unbound signed drawing set;
one unbound set of specifications; PDF electronic copy of full-size, half-size, and
specifications on CD.
· EOPC with bid set contract documents (PDF electronic copy).
Assumptions: The following assumptions apply:
· Project CADD standards will be Auto CADD Civil 3d 2008. Prepared at 20 scale.
City of Bremerton
Gorst UGA Sewerage Project
Scope of Work
8
236-1896-085
May 2009
· Specifications shall be EJCDC General Conditions as amended by the City Standard
Supplemental Conditions. The design team will prepare the technical specifications for
Division 2 through 16. Divisions 0 and 1 will be developed jointly with the City.
. The design will include an estimated 45 drawings:
TASK 11 PUMP STATION DESIGN (60% AND 100%)
Objective: Prepare SB-3 and SB-4 drawings and specifications for two package pump stations based
upon the Gorst Facility Plan, project meetings, and further project discussions with the
City. EOPC will be based on the local construction environment at the time of estimate,
and will incorporate appropriate contingencies for the level of estimate.
Approach: The following approach applies:
· Establish design flows based on readjustment of the drainage basins tributary to the
two pump stations.
· Coordinate pump station design needs through Consultant, such as geotechnical
investigation, permitting, surveying, etc with Consultant.
· The Pump Station design will be sufficiently complete to achieve the permit
application schedule set forth in task 7.
· Develop 60 percent design drawings and specifications for review. The 60 percent
drawings will show the site layout, building limits, and indicate the proposed
equipment.
· Develop 100 percent design drawings and specifications for review. The 100 percent
drawings will incorporate review comments from the 60 percent review.
· Develop final bid documents (design drawings and specifications), incorporating the
90 percent review comments.
· Prepare an Engineer's Opinion of Probable Cost (EOPC) at the 60 percent, 100
percent, and bid-ready stages of design.
. Attend and participate in one community meeting.
· Provide internal review and quality control of the work throughout the design,
including review of the 60 percent and 100 percent design submittals, and bid ready
submittal. Review the EOPC at each submittal stage.
Deliverables: Work products will include:
· 60% drawings, specifications, and EOPC. (PDP electronic copy).
· 100% drawings, specifications, and EOPC. (PDF electronic copy).
· Bid set contract documents (drawings and specifications). One full-size (22" x 34")
unbound signed drawing set estimated to include 15 sheets; One half-size (11" x 17")
unbound signed drawing set; One unbound set of specifications; PDP electronic copy
of full-size, half-size, and specifications on CD.
City of Bremerton
Garst UGA Sewerage Project
Scope of Work
9
236-1896-085
May 2009
. EOPC with bid set contract documents (PDF electronic copy).
Assumptions: The following assumptions apply:
. Design will be for two package pump stations relying on the ROM-TECH or equal
package station as the basis of design.
. Project CADD standard will be AutoCADD Civil 3D 2008. Project will use Microsoft
Office 2007 for word processing, spreadsheets, etc.
. Weekly project team meetings will be a maximum of three hours in duration, include
two hours of travel time, and be attended by one Subconsultant staff. Twenty project
meetings are assumed.
. Community meetings will be a maximum of four hours in duration, include two hours
of travel time, and be attended by one Subconsultant staff.
. Shoring and dewatering design will be the responsibility of others.
. Suitable electrical power is available adjacent to each site.
. A corrosion investigation is not included.
· Site plan drawings will be prepared at 20-scale for "full size" (22" x 34") sheets,
which will be provided at reviews at half-size (11" x 17"). Architectural, structural,
mechanical drawings will be prepared at scales required to present the design.
· Specifications shall be EJCDC General Conditions as amended by the City standard
supplementary conditions. Provide applicable technical specifications for Divisions 2
through 16. Division 0 and 1 will be developed with the City.
· The budget is based upon production of the estimated 15 drawings:
TASK 12 PRIVATE SYSTEM CORRECTION DESIGN (60% AND 100%)
Objective: To design the "standard" low pressure pumping and pipeline system to connect up to 60
residential properties currently on septic tank into the new gravity system serving the
Gorst UGA in compliance with State and County regulations.
Approach: The following approach applies:
· Based on alternative grinder pump manufacturers, the City will determine the system
to be used for this project.
· The City staff will meet with individual property owners and provide input to the
Parametrix team as to the location of the system on private property.
· Based on input from the City and the Health District, prepare 60% design documents
that show location and sizing of the system on private property and the connection to
the public system developed in Task 10, as well as specifications for review.
· Develop final bid documents (plans and specifications) incorporating the 60% review
comments.
City of Bremerton
Garst UGA Sewerage Project
Scope of Work
10
236-1896-085
May 2009
· Provide internal review and quality control of the work throughout design and at the
time of document submittal.
· Individual drawings will be prepared for each property to be connected to the new
system.
Deliverables: Work products will include:
. 60% drawings, specifications, and EOPC.
· Bid set documents (estimated 25 drawings and specifications) and EOPC.
Assumptions: The following assumptions apply:
· Properties to be connected to the new system will be determined by the City working
with the Health District.
· Designs will only be developed for those properties to connect to the new system.
· Procedures will be prepared that outline the responsibilities of the property owner, the
City, and the Contractor to install the system (including piping and electric wiring) and
decommission the existing septic system.
· The private system connection phase of the project will be bid separately from the
pipeline and pump station phase.
· CADD or graphic standards to depict the private system will be determined by the
City.
· Specifications will be developed jointly with the City during the 60% design phase.
TASK 13 PREPARATION OF BID DOCUMENTS AND ASSISTANCE DURING BIDDING
Objective: To prepare bid documents for the two construction packages consistent with the City
standards and bidding procedures.
Approach: The following approach applies:
· To coordinate the plans and technical specifications to avoid conflicting references and
to coordinate Division 0 and Division 1 for consistency and conformance to City legal
requirements and terms of the grants and loans funding the project.
. Assist the City during the bidding process.
Deliverables: Work products will include:
· Camera ready plans and specifications for the two bid packages for printing and
distribution by the City.
· Responses to RFI's during bidding.
· Prepare addendums.
Assumptions: The following assumptions apply:
City of Bremerton
Gorst UGA Sewerage Project
Scope of Work
11
236-1896-085
May 2009
. .
. The pipeline and pump station will be bid as one package and the private system
connections as a second bid package.
. The City will print and distribute the bid documents.
TASK 14 QAlQC
Objective: To provide high quality, complete documents to the City.
Approach: The following approach applies:
. The responsible party prepares the design to review the documents during the
development phase, but to have a separate and independent review by Parametrix prior
to delivery to the City.
Deliverables: Work products will include:
. There will not be a separate deliverable under this task.
Assumptions: The following assumptions apply:
. There will be ongoing reviews and quality control during design with a formal review
prior to submittal to the City of all deliverables.
TASK 15 SUPPORT TO RIGHT-Of-WAY ACQUISITION AND PRIVATE SYSTEM
NEGOTIATIONS/AGREEMENTS
Objective: To support and assist the City with the acquisition of right-of-way and the securing of
applicable documents/agreements for the installation of the grinder pump and pressure
pipes on private property.
Approach: The following approach applies:
. To provide design, drafting, and production support as needed.
Deliverables: Work products will include:
. Deliverables to be as determined by the City to include:
> 11 "xl7" map of each parcel developed during Task 12
> checklists
> "cut sheets"
Assumptions: The following assumptions apply:
. The level of support will be as directed by the City.
City of Bremerton
Gorst UGA Sewerage Project
Scope of Work
12
236-1896-085
May 2009
EXPENSES
Expenses for Parametrix are based on 4% of direct labor cost. Expenses for HDR are based on
actual expenses incurred.
PHASE 02 CONSTRUCTION SERVICES
· Scope of services and budget for Construction Services will be developed during
Phase 1.
City of Bremerton
Gorst UGA Sewerage Project
Scope of Work
13
236-1896-085
May 2009
EXHIBIT B
Schedule
Garst Sewer Project
10 Task Name Duration Start Finish IMav IJune I Julv I Auaust I Seotember
4/26 I 5/3 I 5/10 I 5/17 I 5/24 I 5/31 I 6/7 I 6/14 I 6/21 I 6/28 I 7/5 I 7/12 I 7/19 I 7/26 I 8/2 I 8/9 I 8/16 I 8/23 I 8/30 I 9/6 I 9/13 I 9/20
1 Notice to Proceed o days Wed 4/29/09 Wed 4/29/09 4/29
2 Verification of Facility Plan Assumptions/Concept 5 days Wed 4/29/09 Tue 5/5/09
3 Survey 30 days Wed 4/29/09 Tue 6/9/09
4 Geotech 10 days Mon 6/8/09 Fri 6/19/09 -
5 30% Pipeline Design 25 days Wed 5/6/09 Tue 6/9/09
6 Utility Locates/Pothole 20 days Wed 5/6/09 Tue 6/2/09
7 Utility Relocation 32 days Wed 5/6/09 Thu 6/18/09
8 Bid Packages 10 days Wed 5/27/09 Tue 6/9/09
9 Cost Estimates 10 days Wed 5/27/09 Tue 6/9/09 -
10 60% Pipeline Design 30 days Wed 6/24/09 Tue 8/4/09
.
11 60% Pump Station Design 65 days Wed 5/6/09 Tue 8/4/09
12 60% Connection of Existing System Design 40 days Wed 6/10/09 Tue 8/4/09
13 Construction Traffic Control 30 days Wed 6/24/09 Tue 8/4/09
14 Right of Way/Easements 45 days Fri 7/17/09 Thu 9/17/09
15 Constructibility Review 10 days Wed 7/22/09 Tue 8/4/09
..
16 Permits: Local, WSDOT, R1R 45 days Wed 6/10/09 Tue 8/11/09
17 Pre-Qualify Contractors 15 days Wed 8/5/09 Tue 8/25/09
18 30% City/AgencyReview 10 days Wed 6/10/09 Tue 6/23/09
19 60% City/Agency Review 5 days Wed 8/5/09 Tue 8/11/09
20 City/Agency Review FINAL 5 days Wed 8/5/09 Tue 8/11/09
21 100% Pipeline Design FINAL 15 days . Wed 8/12/09 Tue 9/1/09
22 100% Pump Station Design FINAL 15 days Wed 8/12/09 Tue 9/1/09
23 100% Connection of Existing System Design 15 days Wed 8/12/09 Tue 9/1/09
24 Coordination with Operations 60 days Wed 6/10/09 Tue 9/1/09
25 30% QAlQC 5 days Wed 6/3/09 Tue 6/9/09
26 60% QA/QC 5 days Wed 7/29/09 Tue 8/4/09
27 100% QA/QC 5 days Wed 8/26/09 Tue 9/1/09 ~
28 PS&E 10 days Wed 9/2/09 Tue 9/15/09
29 Weekly Project Meetings 101 days Thu 5m09 Thu 9/24/09 ..I I I I I I I I I I I I I I I I I I I I I
51 Health District Coordination 90 days Wed 5/6/09 Tue 9/8/09
52 Public Information 90 days Wed 5/6/09 Tue 9/8/09
53 Public Meetings 41 days Thu 6/11/09 Thu 8/6/09 I I
56 One-on-One Meetings with Property Owners 65 days Tue 5/26/09 Mon 8/24/09
57 Advertise for Bids 1 day Thu 9/17/09 Thu 9/17/09 ..-
..
58 Project Management 100 days Wed 4/29/09 Tue 9/15/09
Project: 5-19-09 Gerst Sewer Schedul Task Progress Summary '" ..I External Tasks I';J~ik~%o/i~f{1 Deadline 0
~Y ,'__:'08 ''<1; ~~, ,<,'1'.
Date: Fri 5/29/09 Split Milestone . Project Summary .. . External Milestone .
I I I I I I I I I I I I I I I
Page 1
EXHIBIT C
Fee Schedule
, PARAMETRIX
Form 01-PD-40/Rev. 1/16/09
City of Bremerton
Gorst UGA Sewerage Project
BUDGET SUMMARY
Check
Labor I~a'o" Ii Expense Mark-up Expense Subtotal Subconsultants Sub Mark-up Subconsultant Total
Amount Ad' t t Labor Subtotal Expenses Subtotal
JUs men
:es~~1; 100.0% n "if JIJ~{; 5.0% ~ ~
~' '<, '
" v,
.~. rr'''' J/: c.; ....
Phase Task c ' ' ','
Description ~.~T .' . ,ii; (y'~ .' .,,7Z '. ......
No. No. "-^'-<' , ' ',; . '. ...;,i~l
1 Design and Bid Documents
1 1 Project Management $17,486 $17,486 $12,450 $623 $13,073 $30,559
1 2 Project and Public Meetings $18,546 $18,546 $12,000 $600 $12,600 $31,146
1 3 Planning Verification/Basis of Design $5,760 $5,760 $5,760
1 4 Survey and Mapping $22,644 $22,644 $1,450 $1,450 $24,094
1 5 Geotechnical Services $2,949 $2,949 $32,000 $1,600 $33,600 $36,549
1 6 Utility Coordination/Relocation $10,440 $10,440 $10,440
1 7 Permitting $15,907 $15,907 $15,907
1 8 Construction Traffic Control $13,794 $13,794 $13,794
1 9 Cost Estimating $9,804 $9,804 $9,804
1 10 Pipeline Design $157,017 $157,017 $157,017
1 11 Pump Station Design $5,120 $5,120 $127,646 $6,382 $134,028 $139,148
1 12 Private System Connection Design $65,305 $65,305 $65,305
1 13 Bid Document Preparation/Support $10,572 $10,572 $5,000 $250 $5,250 $15,822
1 14 QAlQC $5,698 $5,698 $6,000 $300 $6,300 $11,998
1 15 Rf\N and Private System Support $13,627 $13,627 $13,627
1 16 Support servicesa $30,000 $30,000 $30,000
Design Total
2 Construction Services
2 1 Services During Construction
Construction Services Total
3 Expenses
1 PMX expenses (4% Direct Labor) $4,778 $4,778 $4,778
2 HDR expenses $8,500 $425 $8,925 $8,925
I TOTAL $404,669 .~<j1,:'.~404,~6Jt $6,228 :) i;iFIUH..t$(;;428 $203,596 $10,180 .. .;'..;;..$~~;?Z~ $624,672
Signatures
Project Manager - Date
Division Manager - Date
Principal - Date
Project Delivery System
Page 1 of 1 - SUMMARY
File Name: Jan's Budget 5-28-09 2 Large - 01-PD-401.xls
Date Printed: 5/29/2009
. pARAMETRIX
Form 01-PD-40/Rev.6/26/08
City of Bremerton
Gorst UGA Sewerage Project
LABOR
Project Senior Design . Labor
Categories Task Lead Engineer Scientist Chief Survey Survey Crew CADD Admin Support Services
Manager Engineer Engineer Amount
Multip/ier is 3. 1 Cost Rates $71.63 $65.93 $60.90 $34.36 $30.90 $40.07 $41.48 $40.00 $30.19 $23.32 ,
Burdened Rates $160.00 $160.00 $160.00 $106.52 $95.79 $124.22 $128.59 $155.00 $93.59 $72.29 $30,000.00 ~:rfl
t~I.'~+. . ',Jl. .\ ;\tt4~';lJ <1;:;~~~K~j 1;'1:'1~4~2) I.':Th:.:;;2~" ., ~'~'ir . lIP' , I",>, ;J~rl:, i k+tf "'lJ~I::; ';~\'1~ 1.1. <~t~ ;K~lIIV ;:! ..1~ li.~'~. ~J
Phase-Task Description -<. . < . " li:;~!;':;. ;0,.r .,t:
::1 ....?!;;~y; .. . ..~: ';1... '%0 I.~ . ;;'
.. ...=.~c.. -, . . " ~~ . .,>
1 - 0 Design and Bid Documents
1 - 1 Project Management 72 16 4 40 $17,486
1 - 2 Project and Public Meetings 12 60 12 8 12 8 24 $18,546
1 - 3 Planning Verification/Basis of Design 12 16 8 $5,760
1 - 4 Survey and Mapping 4 8 4 24 100 16 $22,644
1-5 Geotechnical Services 4 8 8 $2,949
1-6 Utility Coordination/Relocation 8 12 4 8 60 $10,440
1-7 Permitting 4 12 12 72 8 24 $15,907
1 - 8 Construction Traffic Control 8 40 8 80 $13,794
1 - 9 Cost Estimating 8 24 8 40 $9,804
1 - 10 Pipeline Design 24 288 16 32 32 1020 36 $157,017
1 - 11 Pump Station Design 32 $5,120
1 - 12 Private System Connection Design 16 100 100 40 320 32 $65,305
1 - 13 Bid Document Preparation/Support 12 28 8 40 $10,572
1 - 14 QAlQC 4 28 8 $5,698
1 - 15 RfW and Private System Support 8 40 16 24 16 $13,627
1 - 16 Support servicesa 1 $30,000
- Design Total
-
2-0 Construction Services
2 -1 Services During Construction
- Construction Services Total
-
3- Expenses
- 1 PMX expenses (4% Direct Labor)
-
-2 HDR expenses
-
-
-
-
-
-
- .
-
-
-
-
-
-
-
-
-
-
-
-
- .
-
-
-
-
TOTAL 188 620 124 212 180 84 68 100 1444 220 1 $404,669
Project Delivery System
Page 1 of 1 - LABOR
File Name: Jan's Budget 5-28-09 2 Large - 01-PD-401.xls
Date Printed: 5/29/2009
. PARAMETRIX
Form 01-PD-40/Rev. 6/26/08
City of Bremerton
Gorst UGA Sewerage Project
EXPENSES
Categories mileage copies plots fax color prints Misc Expenses
Rates $0.550 $0.05 $1.00 $1.00 $5.00 $1.00 I "illi;fI.
Phase-Task Description IBTI'iM'1V t' : . .< .'#'#M'C eft \'1; it "fi;i:t" "f1'li*t:t. . fi~;cO"~
.1'-' " :~.. ,,,, ,-'.-;0 "
1 - 0 Design and Bid Documents
1 - 1 Project Management
1 - 2 Project and Public Meetings
Planning Verification/Basis of
1 - 3 Design
1 - 4 Survey and Mapping $1,450
1-5 Geotechnical Services
1 - 6 Utility Coordination/Relocation
1 - 7 Permitting
1 - 8 Construction Traffic Control
1 - 9 Cost Estimating
1 - 10 Pipeline Design
1 - 11 Pump Station Design
1 - 12 Private System Connection Design
1 - 13 Bid Document Preparation/Support
1 -14 QAlQC
1 - 15 RIW and Private System Support
- Design Total
-
2-0 Construction Services
2 - 1 Services During Construction
- Construction Services Total
-
3 Expenses
- 1 PMX expenses (4% Direct Labor) $4,778
-
-2 HDR expenses
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5/18/2009 TOTAL 6227.81
Project Delivery System
Page 1 of 1 - EXPENSES
Subconsultants
HDR AMEC Sub 3 Sub 4 Sub 5
Labor Exp Labor Exp Labor Exp ~EXP Labor Exp Total
tP',',; .f~ Llk' ;y:q . ;'#1 Z "J: H::~R.; r" 1;0.~ . 'f:~ iif:' ../ie, wA:'. f:; '. IS~~... 'P"\ <Tc
'. . .c'
$12,450 $12,450
$12,000 $12,000
$32,000 $32,000
$127,646 $127,646
$5,000 $5,000
$6,000 $6,000
$8,500 $8,500
I
I I
$163,0961 $8,500 $32,000 - .. I $203,596
. "'" ,.,- -'" '>1' . ,...
Date Printed: 5/29/2009
AFFIDAVIT OF PUBLICATION
Account #42742 AD #261938
STATE OF WASHINGTON
COUNTY OF KITSAP
I, Laura Wessels, being first duly sworn on oath, deposes and says That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of
KITSAP SUN, that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper to Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an office maintained in the aforesaid
place of publication of said newspaper, that the following is a true text of an advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following date, to wit
And on June 14, 2010 such newspaper was regularly distributed to its subscribers during all of said period
The full amount of the fee charged for the foregoing publication is the sum of $72 23 This amount has not
been paid in full
x, U � �
(Signature of Principal Clerk)
Subscribed and sworn to before me this day of July 21, 2010
ATE
Notary Public in and for the State of Washington, Kitsap Co ty �.�� . • •... �
N o l�� •. �'•;
Request for Qualifications 40 �'(� 12 . •
gL ; •�,,�.
Watershed Planning for ��''��•'•••••' °(����,
Sustainable Development
City of Bremerton, WA
Gorst Creek Watershed Plan
The City of Bremerton seeks statements of qualifications from qualified consultants for preparation of a
Comprehensive Watershed Plan for Sustainable Development and Restoration of the Gorst Creek
Watershed Gorst Creek is located in Central Kitsap County and feeds the headwaters of Sinclair Inlet
The watershed is largely undeveloped with low levels of impervious surfaces, but will become viable for
development with the installation of a sanitary sewer system currently under construction Expertise is
required in watershed characterization, storm water management, land use regulations, Planned- Action
Environmental Impact Statements, and public outreach The protect is funded in part by a grant from the
Environmental Protection Agency A consultant with the ability to foster innovative solutions through all
stages of the project is desired Timeframe is July /August 2010 through December 2012 Qualifications
will be accepted until July 1, 2010 at 4pm Download full RFQ at www ci bremerton wa us in the "Public
w
1
Notices & News" section at the top of the home page by following the link to "Request for Qualifications,
Gorst Creek Watershed Planning "
Contact Brad Ginn at
brad gmn @ci bremerton wa us
June 14, 2010 AD #20101930