Loading...
HomeMy WebLinkAbout4771 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4771 TRANSPORTATION, DEPT OF (WA STATE) Ferry Tunnel General Maintenance Engineering LEG 12-1 11/06/2008 06/15/2011 GM 1463 Termination in writing only if mutually agreed Review date for tracking only . Bremerton Ferry Tunnel GENERAL MAINTENANCE AGREEMENT GM-1463 This Agreement is made and entered into between the State of Washington Department of Transportation, hereinafter the "STATE," and the City of Bremerton, 3027 Olympus Drive, Bremerton, Washington, hereinafter the "CITY." WHEREAS, the STATE has a project within the Bremerton city limits entitled "Downtown Bremerton Pedestrian/BTC Access Improvements," hereinafter, the "Project," to construct a tunnel and associated surface street improvements within the SR 304 corridor; these improvements will enhance the flow of traffic to and from the Bremerton Ferry Terminal, and WHEREAS, this Project was presented to the United States Congress by and for the City of Bremerton in an effort to provide transportation improvements that will primarily enhance the downtown core area by removing vehicular traffic from the surface streets, thereby benefiting the CITY and STATE highway by reducing pedestrian-vehicle conflicts, and WHEREAS, the responsibilities for maintenance and preservation of the tunnel, special paving, and landscaping, as identified by this Agreement, are not clearly defined and/or not defined by RCW 47.24.020, and WHEREAS, it is to the mutual benefit of the STATE and the CITY to define and/or clarify, in writing, each Party's responsibility for maintenance and preservation ofthe Project, limits of which are identified in Exhibit A, attached hereto and by reference made a part of this Agreement, NOW, THEREFORE, pursuant to RCW 47.28.140, RCW 47.24.020, and in consideration of the terms, conditions, covenants, and performances contained herein or attached and made part hereof, IT IS MUTUALLY AGREED AS FOLLOWS: 1. DEFINITIONS 1.1 "Maintenance" is routine preventative service and repair. 1.2 "Preservation" is the rehabilitation or replacement at the end of an element's useful lifespan, after deterioration or damage, when the element can no longer be cost- effectively repaired or maintained. Page 1 of8 . 2. RESPONSIBILITIES 2.1 The maintenance obligations ofthe Parties pursuant to RCW 47.24.020 are not modified, but may be clarified as provided herein. The STATE and CITY agree to the maintenance and preservation responsibilities under the terms of this Agreement as follows: I I Maintenance ! Element I and l Preservation - · Tunnel ~~~era Sy~te~_",,______ STATE*** <~"~.~~ , Tunnel Communications System CITY -- 1 Tunnel Drainage and Sump Pump Systems CITY 'Tunnel Emergency Power Generator System ! STATE*** , I . Tunnel Fire Suppression and Alarm Electrical Systems ! STATE*** I i Tunnel Fire Suppression and Alarm Mechanical Systems I CITY i Tunnel Fire Suppression and Alarm System Yearly Tests CITY* ; Tunnel Gate System STATE*** I Tunnel Illumination I STATE*** I I i Tunnel Sweepin_g and Garbage Pickup ! CITY* I ,.-.-. -- , -.- . Tunnel Traffic Control System** I STATE*** I Tunnel Ventilation System STATE*** . Tunnel Wall Cleaning and Graffiti Removal ! CITY* ; Landscaping I CITY I Surface Street Decorative Pavement (non-asphalt) CITY * Preservation is not applicable ** Includes traffic loops and lane use signs within or mounted on the tunnel. *** CITY shall maintain pursuant to Subsection 2.3 unless otherwise requested pursuant to Subsection 2.11. 2.2 The CITY agrees to perform, at 100 percent CITY expense, the maintenance and preservation of elements identified as CITY responsibility in Subsection 2.1 of this Agreement. 2.3 The CITY agrees to perform, at 100 percent STATE expense, the maintenance of elements identified as STATE responsibility in Subsection 2.1 of this Agreement. 2.4 The STATE agrees to perform, at 100 percent STATE expense, the preservation of elements identified as STATE responsibility in Subsection 2.1 of this Agreement. 2.5 Maintenance by the CITY under the provisions of this Agreement shall be in accordance with STATE's Maintenance Standards referenced in Exhibit B, attached hereto and by reference made a part of this Agreement. Page 2 of8 2.6 The CITY shall keep records of maintenance and preservation activities for all Tunnel elements it maintains or preserves. These records shall be made available to the S TATE upon request. 2.7 Should the CITY fail to provide maintenance and preservation for those elements identified as CITY responsibility in Subsection 2.1 of this Agreement, the STATE shall provide written notification thereof to the CITY, and the CITY agrees to cure any maintenance and/or preservation deficiencies within 48 hours if the STATE identifies the failure as a safety concern or impacting operations, or otherwise within thirty (30) days of receipt of STATE notification. Should the CITY continue to fail to cure any maintenance and/or preservation deficiencies for those elements identified as CITY responsibility, the CITY agrees that the ST ATE may perform the maintenance and/or preservation, and the CITY agrees to reimburse the ST ATE for such costs within thirty (30) days of receipt of a STATE invoice. If payment is not made within ninety (90) days from receipt of a STATE invoice, the CITY further agrees and authorizes the ST ATE to withhold, and use as payment, motor vehicle fund monies credited or to be credited to the CITY pursuant to RCW 47.24.050. The STATE's method for repairing decorative pavement is patching with HMA. 2.8 The STATE shall be responsible for the costs ofthe electrical, water, and telephone service charges for the Tunnel and Tunnel related systems. 2.9 The CITY shall be responsible for the costs of the fire alarm monitoring charges for the tunnel alarm system. 2.10 Sanitary sewer and storm drainage from the tunnel shall be discharged to the CITY's system at no cost to the S TATE. 2.11 If written request is provided by either Party before October 1 st of a calendar year, beginning the following July.1 S\ the CITY will be relieved of the CITY's responsibilities under Subsection 2.3, and the STATE agrees to perform the maintenance, at 100 percent STATE expense, of elements identified as STATE responsibility in Subsection 2.1 of this Agreement. 3. THIRD PARTY DAMAGE 3.1 The CITY shall be responsible for performing the repair with CITY forces of all third party damage to all elements listed in Subsection 2.1 for both the CITY and STATE, including replacement of elements damaged beyond repair. 3.2 If the CITY deems that third party damages to an element for which the STATE is responsible, pursuant to Subsection 2.1, are beyond the capability of CITY forces to replace or repair, the CITY shall notify the STATE, and the STATE shall perform the replacement or repair. Page 3 of8 3.3 The CITY shall be 100 percent responsible for the costs to repair damage by third parties and replace elements damaged beyond repair by third parties, and shall be responsible to seek reimbursement from third parties for said costs, for elements for which the CITY is responsible pursuant to Subsection 2.1. 3.4 The STATE shall be 100 percent responsible for the costs of repair for damage by third parties and replace elements damaged beyond repair by third parties, and shall be responsible to seek reimbursement from third parties for said costs, for elements for which the STATE is responsible pursuant to Subsection 2.1. 3.5 The CITY shall keep records of its repair and/or replacement activities due to third party damage. These records shall be made available to the STATE upon request. 3.6 The Parties agree that should the CITY fail to repair third party damage to elements for which the CITY is responsible, pursuant to Subsection 2.1, the STATE shall provide written notification thereof to the CITY, and the CITY agrees to repair the third party damage within 48 hours if the ST ATE identifies the failure as a safety concern or impacting operations, or otherwise within thirty. (30) days of receipt of STATE notification. Should the CITY continue to fail to repair said third party damage, the CITY agrees that the STATE may repair the third party damage, and the CITY agrees to reimburse the STATE 'for repair costs within thirty (30) days of receipt of a STATE invoice. If payment is not made within ninety (90) days from receipt of a STATE invoice, the CITY further agrees and authorizes the STATE to withhold, and use as payment, motor vehicle fund monies credited or to be credited to the CITY pursuant to RCW 47.24.050. The STATE's method for repairing decorative pavement is patching with HMA. 3.7 If written request is provided by either Party before October 1 st of a calendar year, beginning the following July 1 st, the CITY will be relieved of the responsibility under Subsection 3.1 to perform the repair of third party damage to elements identified as STATE responsibility in Subsection 2.1 of this Agreement, and the STATE will perform said repairs at STATE expense. 4. PAYMENT 4.1 The STATE, in consideration of the faithful performance of maintenance and preservation work performed by the CITY, as provided in Section 2, agrees to reimburse the CITY for the direct salary and direct non-salary costs of the maintenance and preservation work that is the responsibility of the STATE. Per Reciprocal Overhead Agreement OHOOI66, no overhead shall be billed or paid. Page 4 of 8 .. 4.1.1 The STATE shall make partial payments for maintenance and preservation work upon receipt of a detailed invoice to cover costs incurred. These payments will not be more frequent than one (1) per month. The STATE agrees to make payment within thirty (30) days from receipt of an invoice from the CITY. If the STATE does not agree with the CITY's invoice, the Parties shall resolve all work or cost discrepancies before payment is made. 4.1.2 In order to meet June 30th fiscal year-end requirements, the CITY agrees to invoice the STATE no later than July 15th, in each year of this Agreement, for all outstanding services and/or work performed in the month of June. If applicable, the CITY also agrees to invoice the STATE, under the same deadline, for services and/or work performed in earlier months in the respective fiscal year, but not yet billed. 4.1.3 Invoices for maintenance and preservation work shall include the following information: Agreement Number GM-1463, Maintenance Work Beginning and end date of invoice period Labor hours and rates Equipment hours and rates Materials used and prices 4.2 The STATE, in consideration of the faithful performance of third party repair and/or replacement work performed by the CITY, as provided in Section 3, agrees to reimburse the CITY for the direct salary and direct non-salary costs of the work that is the responsibility of the STATE. Per Reciprocal Overhead Agreement OHOOI66, no overhead shall be billed or paid. 4.2.1 The STATE shall make partial payments for third party repair and/or replacement work upon receipt of a detailed invoice to cover costs incurred. These payments will not be more frequent than one (1) per month per incident. The STATE agrees to make payment within thirty (30) days from receipt of an invoice from the CITY. Ifthe STATE does not agree with the CITY's invoice, the Parties shall resolve all work or cost discrepancies before payment is made. 4.2.2 In order to meet June 30th fiscal year-end requirements, the CITY agrees to invoice the STATE no later than July 15th, in each year of this Agreement, for third party repair and/or replacement work performed in the month of June. If applicable, the CITY also agrees to invoice the ST ATE, under the same deadline, for third party repair and/or replacement work performed in earlier months in the respective fiscal year, but not yet billed. 4.2.3 Invoices for third party repair and/or replacement work shall include the following information: Page50f8 Agreement Number GM-1463 Incident Identification Number (a unique number assigned by the CITY) Date of third party damage (or discovery of damage) Labor hours and rates Equipment hours and rates Materials Used and prices 4.3 During the progress of the work and for a period not less than three (3) years from the date of any payment by either Party, the records and accounts pertaining to the work under this Agreement and accounting thereof are to be kept available for inspection and audit by the CITY, state, and/or the federal government and copies of all records, accounts, documents, or other data pertaining to this Agreement will be furnished upon request. If any litigation, claim, or audit is commenced, the records and accounts along with supporting documentation shall be retained until all litigation, claim, or audit finding has been resolved even though such litigation, claim, or audit continues past the 3-year retention period. 5. RIGHT OF ENTRY 5.1 The Parties hereby reciprocally grant to each other the right of entry upon all land in which the Parties have an interest for the purpose of accomplishing the work required herein. 6. TERM OF AGREEMENT 6.1 This Agreement may be terminated only if mutually agreed to by both Parties. Termination shall be in writing and signed by both Parties. 6.2 Termination of this Agreement shall not prejudice any rights or obligations accrued to the Parties prior to termination. 7. MODIFICATIONS 7.1 This Agreement constitutes the entire agreement between the Parties on the subject matter hereof. There are no understandings, agreements, or representations, oral or written, not specified herein regarding this Agreement. No waiver, consent, modification or change ofterms ofthis Agreement shall bind either Party unless in writing and signed by both Parties. Any waiver; consent, modification or change, if made, shall be effective only in the specific instance and for the specific purpose given. The failure of the CITY and/or the ST ATE to enforce any provision of this Agreement shall not constitute a waiver by the CITY and/or the STATE of that or any other provision. Page 6 of8 8. SEVERABILITY 8.1 Should any part, term or provision of this Agreement be determined to be invalid, the remainder of this Agreement shall not be affected, and the same shall continue in full force and effect. 9. DISPUTE RESOLUTION 9.1 In the event that a dispute arises under this Agreement, it shall be resolved as follows: The CITY and the ST ATE shall each appoint a member to a disputes board, these two members shall select a third board member not affiliated with either Party. The three- member board shall conduct a dispute resolution hearing that shall be informal and unrecorded. The decision of the board shall not be binding upon the Parties, but its recommendations shall be given serious consideration when resolving the dispute. An attempt at such dispute resolution in compliance with aforesaid process shall be a prerequisite to the filing of any litigation concerning the dispute. The Parties shall equally share in the costs of the third disputes board member. Each Party shall be responsible for its own costs of the disputes board. 10. LEGAL RELATIONS 10.1 Each Party shall protect, defend, indemnify, and save harmless the other Party, its officers, officials, employees, and agents, while acting within the scope of their employment as such, from any and all costs, claims, judgments, and/or awards of damages (both to persons and/or property), arising out of, or in any way resulting from, each Party's negligent acts or omissions. No Party will be required to indemnify, defend, or save harmless the other Party ifthe claims, suits, or actions for injuries, death, or damages (both to persons and/or property) are caused by the sole negligence of the Party. Where such claims, suits, or actions result from the concurrent negligence of both Parties, or involves those actions covered by RCW 4.24.115, the indemnity provisions provided herein shall be valid and enforceable only to the extent of each Party's own negligent acts or omISSIOns. 10.2 This indemnification shall survive the termination of this Agreement. 11. VENUE 11.1 In the event that either Party deems it necessary to institute legal action or proceedings to enforce any right or obligation under this Agreement, the Parties hereto agree that any such action or proceedings shall be brought in the superior court situated in Thurston County, Washington. The Parties shall be responsible for their own costs, including attorneys fees. Page70f8 IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the Party's date signed last hereto below. CITY OF BREMERTON By: WASHINGTON STATE DEPARTMENT OF TRANSPORTATION By: on, Region Administrator Date: /o!Ja/oi I I Date: A/ov (0 tcz}fj , APPROVED AS TO FORM: APPROVED AS TO FORM: /~ By: Date: /0-;). q.o2' Date: ~ ...O't' - O~ . Page 8 of8 I E ~ " l i t' I' I i II l a I I . Sf.... M ""4000 I" I '"d':tt~ 'l(WW I I "'TOt D:IS1N; I I ~ I I =? I I ~ I I .Jl< .. ,,~_ ~ .... 00[ UI€ , '--0_ t ~ I- I I I I I I I W :l Z ~ <( ~ It: ~ T 7+10.00 . B 57+80.00 (11'lT.) -I!!..!!.~. PUS1lC SlllP UIf: Del IIQ.8.f 1tWlor <0010 UIf: 8i-i;!!!1!!Of!!'E ~~~ ... - '" cal._ ....~'- . i!!<. 15" - i'" 1--_____ f-"'- - - - ! ~~ H~ as (~ ~~.~.2.75 PA 10+00.00 I i I ~ ...... '"""".... . . ~ ~ Ci.iR1.~-:;.-:t--r------- J C:~ ct..,_~.. ""'21:106 ~ (DODlW .......2lXlI < , ~ r; .' . -- ., ...... - !t..~_..._..__' ___ __.___~:.::__--=::: -Ml . , CArr , .t(~1il, --.:L._--...i._ GM-1463 EXHIBIT "A" Page 1 of 5 BEGIN AGREEMENT lIMITS. liP 2.7' . .11400 . . 1t.III._ -...--..-...--- BW-I.llI( ~I.ao <f~--- 8 's + :J: ...'LoJ ~~ .;1~ _ I ::1 HINE -- ~ B-UNE :: BURWELL STREET _ ----- 100<<1 -------- .}-!i_. --------~~~~-~~~~~~~~~~~~~~~~~~-o ~-'\ CONSTRUCTlON---'iQIL o :' ~ :(.~-->> Q) ... 0IlW.! 'I(UQI COOtI UIf: (II-IIUO"" <D .... [oc( UIf: (11-10.10-") G) - - (II->4J1l-<1O) Q) ...... lJl[ (\o-........) <D I'IJ01It SlIP 1M (11-,5......) (j) ......., __ UIf: (ll-l5.'G-OIll <!) R tIlT[ UM: LNt. qn--\.M€ (Jl( .T JWJ1: (.....,....,. sa ..... I @) 'fEUOI!llIl( \.II. ....n-lJII[ 00( ... 1WJC (lQO.JII"'" K[ OEW. J @ 'fEUOI 0l0[ 1M (II.........) -; 'SR304 I ":if .......:Iil.tt. I DOWNTOWN BREMERTON PEDESTRIANI h2 .........----.. i- - --. . ..... BTe ACCESS IMPROVEMENTS · x . It. c h 1- DI.arut...i "T"", tatIeoI -- X -- -- -- 8URWEU. SlllEETIPARI( "VBlUE LClCHNI!'R I IF 2.73 TO 1M' 2.13 .., ",",D GM-1463 EXHIBIT "A" Page 2 of 5 I I I I I I I It' r I I I I ICIU"_ I L___ . f I .. ~ i I I ! J II l ! f I , ----------- ......--- ~-------.--- r--- I I I I I I I I~ !~ :i~j~ I~!I! 1 >> I >> . L............ I ~ ~L: -1-- j~ r- Iit<<I ------~ -------- i:l r-------- I ,I : ,m I . w I I'"~ . I 'w I I I I J w I : I I I : I I I , I i I , I .. I I I ~1 ~~'-'~12._ ~_ IlATCHliNE P 67+80.00 j r------- I I I . _i_ _ L - ~ _ _ _ ~\~ _ il I , I i -.c-.,-[...,.. . _ ~ II! "-"'- ,,,or ""-"',. ~:t' '_____. .. ~. __~/IIll\'l15u ~.~ _ ___. i ~ "~tt"Uf o\III1l 2lXl1 ~ :....,: 1~[r.tJN4.-~-"~. WI. ~ ---=t------~___ ,...,........ . . NchOI.vs.-..... . STAT[ ,reo. ~ I I SR304 ~ .. I DOWNTOWN BREMERTON PEOESTRIANI U... .!...t......i..~ I. ;;.;c~J . __I 8TCACCESS~~OVEMENTS LOCHNI!!R I IlURWEU. STREET/PACIfIC AVEMJE Ill' 2.13 TO MP 2.84 1 10 I lMIH. .... -'-' ., QAt[ ~._-~.;.----- ."1.....- CONSTR~ION NOTES o :' ::;.~..., ill ... DOl&! l\WlI COlItJ LII( (.-,...,...., <D IH1[ toe( "" ('HO.IO-"" G) lWf'C"" (...'..10...., <D .. 'IIQ[ LII( (lI.lO.10-rGl @ "-'51IC SIr' lJt: (IH!.lo-GIl) ill ,,--"LII((""~10-llO) @......m:_DlXII"lC'I"""';l>O/) .... .-. (IH'lHlO) (!) ........... lJlt "",n-_ 01' . "" IWfC (.-,. JHO~ sa 0(1. @ ltU.O* UC[ 1..M. .....tI.LAN( CIiI( ... 1lWl'I: (lI-JIl.JO-G?). sa DlTM. I @ ~""'LII("'_ Il[lM.lltlM. i:l --'\. . f l , ~ , t t I i I ! ! I ~ ~ , I I t:; ~ .. SEC. 13, T.24N., R.1 E.. W.t.4. SR 304, loIP 2.88 P 111+11.10. S1G+OO.oo --------l I I I . I I I I I I I I I I tT"!t 'c. .tJlI PlIO.l IrIlO 10 "SM. """..-. IY' ...."0 GM-1463 EXHIBIT "A" Page 3 of 5 r-- I I I I I I I I I I I I -IL ~ --..... exeltech ~.. ........ .......ca LeCHNER .. Wr La _~.... .D......._I..,.. . . . L.....I---' oc.u.our . I ~~T10N NOTES o :' ::(~.5D-<>>) ill ..............- CDfl(II lJlf (11...,.-0>) 0> lIt1l'_lJlf(.....,0-o>) 0~_(\l.2..>>-all (!) .... _ .. (..2\l.10-<ll1 ill ......... - lJlf (0.1.".10) o IIVl$TC CIOSSM.IlJII( <'1-1110-<<0 ill oum;_~'<<lIQ!(IOIl __tv-1.50-o>) (!) PUSft./_ IH1[ lJlf ... _ OOM. __ Oil . ----. SR 304 . DOWNTOWN BREMERTON PEDESTRIANf " 'Ia-' ~_~~C ACCESS IMPROVEMENTS ! PAClFlC AVEN.E I SECOND STREET ; 1M' U4 lIP 2.ge '~ CH4 x Xx \ A " CONSTRUCTION NOTES "- " 0"'--'" " lU STD- ...... (>>.lO>>Gll) <D :1ll~ "'-lIlW COODI LIlt: <D ..... (... LIlt: (It-'" 104>) (' @ -.: _ (It-2'JO-aI) '? \ <D.... - LIlt: (>>....,04>) \ \ L (!) I\ASTC - LIlt: (.,,~'04>) \ /' (f) I\ASTC ~ LIlt: (It-l~'o-oa) - @ ...__...Ma........, _1.1O._~lUIIlT.lI.Z @ =::~'i.'"~~ @ ~::I'OI_ GM-1463 EXHIBIT "A" Page 4 of 5 ----.----. - - - ~ _ _"L. f :.F:_~!::_...:::_. ~ . ! i t j ! I I I I t ! ~ . ~ ~ I I , , , \ , , , , \ \ \ \ \', \ \ \ \ \ \ \,,\ \ \ \ \ \ \ y\> \ \ \ \ \ ), \ \/ \ \ " \ \/ \ \;v- ,-~ \ - - --:;.~' \ ~ \~ ~-~(,~ '\ \ ' \ \ \ \ \ END AGREE~!lT LIMITS (SURFACE STREET UP 3.01 \ \ ~.., ~ ~ Clift 'Ilttlt'l",,---- . WlDMl .IrHt. 2COl I~ (j[M'f1ltJ.J"(t.1It AHlLaOClI ~ m QlllM APIII.. JQQI II .... .. ...----- --- ~ "".:-------:"OI.Tt 5([ OWG. Oft rOR SIGH SCI1[o\'lE CCfllT'tHUAT:otif . . . . L....J--" _--.J I.IIIUI'IIT 90% SUBMITTAL ~ ITAT{ rto. &.0 NIO.I. lIlQ ~ ~ ~ 8- .. 1 -- . x . It. c h DL h~."T>......._ ~.. ....... ........ r SR~ ~ DOWNTOWN BREMERTON PEOESTRlANI CH5 BTC ACCESS IMPROVEMENTS ~ .. - JClI_ -~ " "". L.ClCHNER, PACIFIC Ave./ FIlST &T./WASHINGTON Ave. ... 2.118 TO ... 3.05 . f S , . . i t j I ,. J I ! ! I ! i < ~ co i ,-- ---+--- - - "'" "- +-.--- CAr, GM-1463 EXHIBIT "A" Page 5 of5 \ <" '\\ ,/,' \ " \ ,- \ \ \ \ ~'\ (jl..-(\ \ \ \ \ \'\ ~ll;.. - \ \ \ \ \ \ \ '\ \'I- ~ \\ \ \ \ \ \ \ \ .~- - \ \ \ \ \ \ ~~ \ \ \ \ \ \ \ \ \ ~- \\\\\\\\\\\ 1> \\\\\\\ \\ \\/\\-~~ \\\\\\ \\\\\ \ \ \, \ \ \ \ \ \ \ \ \ \\\\\ \\ \\\ \\\\ \\\\\ \\\\\\\ \\ \\\\\\\\\\\ \\\\\\\\\\\ \ \\\,,\\\,\, \ \\\\\\\\\'\ \ \\\\\\\\\\\ \\\\\\\\\\ \ \\\\\\\\ \ \\\\\\\\ \0 \\\\\\'\ \ \\\\\\, \ \\\\\\ \> \\\\" \ \ \ \ , \ \ ,\\, \0 , \ \ \ 0 \ 0 \ "~ ' 0 \ 0 \ \ 0 \ \> ' \ 0 '\ \ 0 '. 0 '\0 \ \ \ ~ \ I I 10 , I '\ '\ '\ o o \ , \ \./ / \ 0 A /0 \ -- y \ ,/ /' , Y' '/ \ \ \/ A 0 \ \ / \ 0 , OAO \ \ ~..I \ \ \ CV \ >;/ __.I( 0 \ 0 ~ \ \ o \ 0 \ \ \ \ 0 \ \ \ \ 0 o \ \ o .Q o \ \ \ o \ p -- -- .Q o . . . . t:::;........ I '''''U'_ CONSTRUCTION NOTES- o ::' ~ ,:;: ..~.lG-(O) <D ~..~ 'IWCO como .. ill .." [DC("", (.....,.....) o 11WTC - ,,'''JO-<Il) <D .. - lIO: (lI-lQ.,O-Olll (!) PU5TC STOP I.JC IIHS,104) ill PUS'" C........ lIO: ~I"'Q.",} '--'., Sf Art: rca .0" ....- --..... exeltech ~.. ....._ ........CIt -.... - ., It J-h........,n.. ... ~UI . SR 304 i DOWNTOWN BREMERTON PEOESTRIANI , BTC ACCESS IMPROVEMENTS r- SR304 I IlREIolERlON TIWISIT CENTER CH6 x . ...., 1"tIG.o. hi) lQ ~. ....- h.lIc;'i.o~ LOCHNER 8T ,t,pp'3 ":' GM-1463 EXHIBIT B Maintenance Standards Tunnel Camera System . Per manufacturer's recommendations. . Operational test yearly. . Clean lenses yearly or as needed. Tunnel Communication System . Per manufacturer's recommendations. . Operational test yearly. Tunnel Drainage and Sump Pump Systems . Inspect 2 times per year including the sump and clean as needed. . Maintain the pump system per the manufacturer's recommendations. Repair as soon as possible. Tunnel Emergency Power Generator System . Per manufacturer's recommendations including regular exercises under load. . Operational test of entire system yearly. Tunnel Fire Suppression and Alarm Systems . Per manufacturer's recommendations. . Operational test yearly. Tunnel Gates . Per manufacturer's recommendations. Repair as soon as possible. Tunnel Illumination . Per manufacturer's recommendations. . Wash 2 times a year. . Replace lamps every 4 years . Repair spot outages as required to maintain minimum lighting levels (7 Yz to 10% outage will trigger). Tunnel Sweeping and Garbage Pickup . Quarterly . As soon as possible for spills that impact operations or safety. . Within 48 hours of discovery or notification of a significant litter problem. GM-1463 EXHIBIT B Page 1 of2 Tunnel Traffic Control System . Per manufacturer's recommendations. Repair as soon as possible. Tunnel Ventilation System . Per manufacturer's recommendations. Repair as soon as possible. Tunnel Wall Cleaning and Graffiti Removal . Wash walls 1 time a year. . Remove graffiti within 5 working days of discovery or notification. Landscaping . Per CITY Standards except that vegetation shall not be allowed to encroach beyond curb line or reduce sight distance below WSDOT (STATE) standards. Surface Street Decorative Pavement . Apply herbicide yearly. . Repair broken and uneven decorative pavement that becomes a safety issue as soon as possible. The STATE will repair decorative pavement that becomes a safety issue with an HMA patch at CITY expense if not resolved by the CITY. GM-1463 EXHIBIT B Page 2 of2