4768
COATINGS UNLIMITED INC
Reservoir 21 - Interior Coating Replacement
PW Admin
LEG 12-1
10/21/2008
04/30/2009
02/15/2011
01/01/2011
Change Order #1-5/09
ACCEPTANCE OF COMPENSATION & RELEASE OF ALL CLAIMS
Reservoir No. 21- Interior Coating Replacement
Coatings Unlimited Inc.
Project Number 45126 - Contract Number 4768
Coatings Unlimited Inc. hereby indicates agreement with, and acceptance of, the final
Contract Payment of $35,856.46, the total Contract Price of $301,680.46 including
Washington State sales and/or use taxes, and the final Contract Time of 173 days, as full
and final compensation for all Work performed in connection with Contract Number
4768, and does hereby release the City of Bremerton from a11 claims, liab?1_ity, dem�.n�s,
damages and actions of any kind whatsoever, arising from performance of that Contract.
Coatings Unlimite c.
By: '� Date: � - a`1 - ��
Title: � �5' es �c�.ex��
Certificate af Nota
`������ 1{���
p► . ��/ �
�����,c,ra t before me this a� day of �u rt.� ,�
' e� ��o�+ �r,e �n,,� S y
i 4�('= o��O`AR}��yg
; ;� a .. - �t�z� � . Cc�r� c3�JZ_ .
: � s o ' .v �a �O ��
� .
; �'4,� p11e���'�#�� � Notary Public �
'�,��j►�'r�►,,�3' Resideing in Normandy Park, WA
� �4� OF �' Commission expires 5-20-11
, • ,,,...
_ �
j
- Washington State '
�' �°' `�i'i ��"���t�� a� Department of Revenue
� � �'� �tr����� PO Box 47474
Olympia, WA 98504-7474
� � 601298793
Certificate of Payment of State Excise �
Taxes by Public Works Contractor
• COATINGS UNLIMITED INC CITY OF BREMERTON PUBLIC WORKS
, 18420 68TH AVE S STE 110 NED LEVER
KENT WA 98032 1093 3027 OLYMPUS DR
BREMERTON WA 98310 4799
We hereby certify that taxes, increases and penalties due or to become due from the above-named ,
, contractor under Chapter 180, Laws of 1935, as amended, with respect to the following public works
contract:
CITY OF BREMERTON PUBLIC WORKS
4768, INTERIOR COAT REPLACE RESERVOIR 21
together with all other taxes, increases and penalties due from such contractor, have been paid in full or that
they are, in the Department's opinion, readily collectible without recourse to the state's lien on the.retained
percentage. .
This certificate is issued pursuant to the provision of Chapter 60.28 Revised Code of Washington for the
sole purpose of informing the state, county, or municipal officer charged with the duty of disbursing or
authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases
the state's lien on the retained percentage provided by this Chapter for excise taxes due from said contractor.
This certificate does not release said contractor from liability for additional tax that may be later �
determined to be due with respect to the above-mentioned contract or other activities.
Dated �l0{�7/��7 at Olympia, Washington,
. State of Washington .
Department of Revenue �
_ , . � , ���� . ..
. Certifyin fficer
For tax ass�stance, visit dor.wa.gov or call 1-800-647-7,706. To inquire about the availability of this document in an alternate format for the visually impaired ;
please call (360) 705-6715 Teletype (TTY) users may call 1-800-451-7985 _
REV 31 0028 (10-01-02) . . . ` It�l�i'������ ��.^� . .
k
� SEp 0 4 2009 �
� ENGINEERING DiViSiON
0
�
' e "" WAS HINGTC�I`� STATE __
�---_____— __._.__ :�:��°' _ _- _ _ - -_�: , -- ..: -. -_ _ �—__ __ _—_ - � - - - - - - — -- - - _=---- -- —
CONTRACTOR: COATINGS UNLIMITED [NC ) CERTIFICATE OF
18420 68TH AVE S STE 110 ) PAYMENT OF CONTR[BUTIONS
. KENT, WA 98032 �) PENALTIES AND INTEREST ON
) PUBLIC WORKS CONTRACT
ES Reference No. 718558-00 I
TO: CITY OF BREMERTON
3027 OLYMPUS DR , �
BREMERTON, WA 98310
��.—_._ ,___ _ ..The Emnl�yment Security Department hereby certifies those contributions, penalties and interest
due from the above named contractor under the�E►nployment Security Acfhave been paid in fuli �r ��� �`
provided for with respect to the following public works contract:
4768
The Employment Security Department hereby certifies that it has no claim pursuant to RCW
50.24.130 against the public body named above for tax attributable to service performed for said public
body by the above named contractor on the above described contract. The Employment Security
Department releases its lien on the retained percentage, which is provided by RCW 60.28.040 for
contributions, penalties and interest due from said contractor.
This certificate does not release said contractor from liability for additional contributions,
penalties and interest which may be later determined to be due with respect to the above mentioned
contract. -
Dated at Olympia, Washington on September 1 l, 2009.
COMMISSIONER
E ENT SECURITY DEPARTM T
B
(Authorized Represen tive)
Original—Disbursing Officer J
Duplicate—Employer
Triplicate—Central Office Files
EMS 8449 760 R3-98
Verify Workers' Comp Premium Status - Employer Liability Certificate Page 1 of 1
Washington State Department of ���'��� Employer Liability
Labor and Industries ��� � :.:� ��' Certificate
. ,., ; '�
� � �.
�� pz �. � ��
� ���� . �
' Department of Labor and Industries
Employer Liability Certificate
Date: 10/O 1 /2009
UBI #: 601 298 793
� Business Name: COATINGS UNLIMITED INC
Legal Business Name: COATINGS UNLIMITED INC
Account #: 594,672-01
'Doing Business As' Name: COATINGS UNLIMITED INC
Estimated Workers Reported: Quarter 2 of Year 2009 "31 to 50 Workers"
(See Description Below)
Workers' Comp Premium Status: Account is current. Firm has voluntarily reported and
paid their premiums.
Licensed Contractor? Yes
License: COATIUI097KA
Expire Date: 4/1/2010
Account Representative: T2 / RICHELLE BLOSL (360)902-4828 - Email:
FOLL235@lni.wa.gov
What does "Estimated Workers Reported" mean?
Estimated workers reported represents the number of full time position requiring at least 480
hours of work per calendar quarter. A single 480 hour position may be filled by one person, or
several part time workers.
Industrial Insurance Information
Employers report and pay premiums each quarter based on hours of employee work already
performed, and are liable for premiums found later to be due. Industrial insurance accounts have
no policy periods, cancellation dates, limitations of coverage or waiver of subrogation (See RCW
51.12.050 and 51.16.190).
https://fortress.wa.gov/lni/crpsi/AcctInfoPrint.aspx?AccountId=59467201 &AccountMariager=T2+%2f+R... 10/1 /2009
.
AFFIDAVIT OF PUBLICATION
Account # 42742 AD# 249240
STATE OF WASHINGTON
COUNTY OF KITSAP
Notary Public in and for the State of Washington, Kitsap County.
I, Laura Wessels, being first duly sworn on oath, deposes and says: That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of
KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kit sap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an office maintained in the aforesaid
place of publication of said newspaper; that the following is a true text of a legal advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following date, to wit:
June 20, 2009 and that such newspaper was regularly distributed to its subscribers during all of said period.
That the full amount of the fee charged for the foregoing publication is the sum of$39.86. The amount has
notbeenpa;d;nfulL g Ju ~
. . ot-/L)
R'-
,. ~.........!'~
l~:~~ .
i ........" ,
\ ~.
~"" -. tOt........
~ tJi.........O:",~;j
~,,~ irA .","" ~\~
~',"...ttt"\'\,~
(Signature of Principal Clerk)
Subscribed and sworn to before me this day of June 29, 2009.
NOTICE OF COMPLETION
Notice of Completion has been issued to Coatings Unlimited Inc., on Contract No. 4768, for the Reservoir
No. 21 - Interior Coating Replacement project. Any parties having a claim for material, labor or damages
related to this Contract have forty-five (45) days from the date of first publication of this notice to file a
claim.
Carol Etgen
City Clerk
345 6th Street
Bremerton, Washington 98337
June 20, 2009.............................AD #20088114
Contract Number:
Vendor:
Subject:
Department:
File Class:
Begin Date:
End Date:
Review Date:
Vault Date:
Comments:
4768,
COATINGS UNLIMITED INC
Reservoir 21 - Interior Coating Replacement
PW Admin
LEG 12-1
10/21/2008
04/30/2009
07/01/2009
Change Order #1-5/09
,
\
CITY OF BREMERTON
CHANGE ORDER
CONTRACT CHANGE ORDER NO: One
PROJECT NAME: Reservoir No. 21 - Interior Coating Replacement
PROJECT NO:
45126
CONTRACTOR: Coatings Unlimited Inc~
ORIGINAL CONTRACT AMOUNT:
PREVIOUSLY APPROVED CHANGES:
THIS CHAN.GE:
REVISED CONTRACT AMOUNT:
$243,180.00. DAYS:
0.00 DAYS:
$34,e10.48 DAYS:
$277, 790.48 DAYS:
80
o
93
173
This Change Orderc covers changes to the subject contract as described herein. The Contractor shall
construct; furnish equipment and materials, and perform all work as necessary or required to
complete .the ChaQge Order Items. The ipcrea.se or: decrea,se in contract price shown below includes
an estimate of cmyapplicable taxes.
DESCRIPTION OF CHANGES
INCREASE IN
CONTRACT
. AMOUNT .
($)
(DEc;REASE)lN.
CONTRACT
AMOUNT
($)
CONTRACT
TIME
EXTENSION
(DAYS:)
R ;:::
"1"""", 'If''''".
. Ql .Ql.
:; :;
0:: 0::'
'x Wol'k Change Directive. 1 - Provide weld repairs and epoxy $2,778.48 2
putty repairs to corroded areas of the reservoir floor plates.
X Work Change Directive 2 - Pressure wash exterior.of reservoir. $6.732~00. 5
X Work Change Directive 3 - Sandblast foof to an SP-:6 to the $25,100.00 14
lower weld s'eam of the l<riuckle and apply zinc primer; one coat
ofTnemec.66, and one coat of Tnemec 73tothi'frooL
72
Added weather days
NET CHANGE.lN CONTRACT AMOUNT $34,610.48 93
INCREASE OR (DECREASE) .
ESTIMATED SAL.EST AX (8.6%) $2.976.50 d.
ESTIMATED TOT At.INCLUDlNG SALES TAX .. $37.586.98
ReserVoir 21- InterIor Coating Replacement.
Change Ord~rNo. L
Pagelof2
CONTRACT CHANGE ORDER NO: One
PROJECT NAME:
Contr(3ttor acknowledges and accepts that this Change Order constitutes final settlement of all claims
of: any kind or l1atLirearising from ,or connected with any work either covered or affected by this
Change Order, including, without lirnitation,ch3ilTls related to contract' time, qn~site; or home office
overhead', or .lost Pfofits;N9thing in this Change Order shall limit the City's righUo bring a claim ,for
past p~rfotmance..
The undersigned ContractOr approves the foregoing Change Order as to the chcmges, if any, io the
contract price specified for each itel11; includillg any and, aU ~uperv.isioncosts an~ bther miscellaneolJs
costs relating to tn!3 change i[) work, and as to the extension oftimeallowed, if any, for completion of
the entire Work d(J~ tQsfjid Change Order.
Tiiis docLiment, will become a supplement of the contract and all provisions will apJ:>ly hereto. ,It is
understood that tnis Change Order shall be eff~ctive when approved by the City of Bremerton.
The parties Whose names appear beloW warrant that they are authorized to ehterinto a change order
thatisbinding on the parties of this<contracL In addition, Contractor warrants thaLlt has or will jJ1fo~m
the surety of this change, and shall take appropriate action to modify any bonds requiredul1der the
contract to addr~ss this chang~; .
RECOMMENDED:
L
RECOMMENDED:
~~/c~ $~
CITY ENGINEER I DIRE.. OT.Oll PUBLlCWOR.KS.
, ,., <
.~?/pf
.. Date
ACCEPTED:
S-:. \\r\-O '1
Date
MAYOR
APPROVED:
ATTEST:
~d~)
City Cle . -. ..
Reservoir iI-Interior Cmiting:Replaceme'nt
Change Order No. I
Pagel of:2
CITY OF BREMERTON
WORK CHANGE DIRECTIVE
WCD#: One,
Page 1 Of 1
Project #: -45126
Date: Feb!'U~lIy13~ 2Q09
PROJECT: Refievolr,21
G.bNTRACTOR: Coati"iP Unlimited
YOU ARE DIRECTED TO 'PROCEED PROMPTl. Y WITH THE FOUOWING CHAHGE(S):.
Weld Repair ,bn,FIOpr,
ATTACHMENT(S):
If a claim is made that the aboVe chailge(s) have, affected COntJ'act Price or Contract Times any claim for a Change Oi'der
is based theteorJ will involve one or more of the following methOds of determining the effect of the change(s). The
Change Order wit,1 ~. executed ,In apcordan<:e with Section 1-04,.4 of thtfWSDOT Standard SpecifICations, or Atticle 10 Of
the General Conditions. .
Method of ~tertnining change in Contract Price:
o UnitPrice
~ Lump Sum
o Trne & Materials
0, Other:
Method of determining change in Contract Tmes:
o
o
Contractor's Records
Enginee(s Records
o
other:
Estimated increase (decrease) in Contract Price:
z.. 7 )'6' l- {,",
$ ?,...',.. Iv
Estimated increase (deer-eaSe) in Contract rnnes:
Substantial Completion:
2
days;
If the change involves,an inCrease, the estimated
arTlOUnt ,!snot to ~,e.~ without further
authorization;,
Ready for final payment ~ays;
.If the, change involVes an increase, the, estimated times
are npjto oe'ex~i3d without further authOiiiation.
RECOMMENDEO:
AUTHORIZED;
'\
CONTRACATbR' J,. iJ
~, " L
'. .",' ,A "
By. --., u- - . . - .' '11-, V
' " ,,' ')"
',,--' ,
Glry OF BRE~E~tON
By:
'~1/(,.
. " '"
I
ab,FOR..s, ~~ ~..3:-00
COATINGS UNLIMITED~INC
City of ar.merton
R"'rvolr2 f IntertorCQatlng Ftep~~t
Contra~ 4\.5.'26
.work: w.!cJ,Repalr Floor
ITEM
Oesalptlon
Units
Qty
1
Weld Replliplnt.FI~or
Labor MatJInv
CHANGE ORD,ER, REQUEST ~01
Oate:.2.13.2009
Eqt
2,270.00
Total
$2,270.00
CornracUlme exte)"lsion:
Comm."..t; Price inc!ucies alllillbpr.Ma~1a andEqulpm~nt.
Items Total
Overhead & Profit (1Wm 1)@ 20%
Sub Total
In. 2%
TOTAL
$2,270.00
,$454.00
$2,724.00
$54.48
'$~778.'"
(..~ p..-'V"":.
. .~... :
.'. ..JJ> !~: - _ j
WESTERN TANK & PIPE
10712 SE HAROLD STREET
PORTLAND, OR 97266
(503) 76(}'9286/FAX(503) 762-1232
r BILL to: "
cOatings Ui111mited, Inc.
18420 68th Avenue. S., Suite 110
KeDt~ W A. 98032-.093
~ ~
.t"
". .
" (
c/-::::;,..___:
".-.. - '--..- .
',', -...;.....; -=:.:'::':,...:-.~'
DATE
1-26-09
(NY #. ]
-
1 .
:i:
r
INVOI.CE
.
City of Bremerton
B~OD flOOr- 'Weld Repairs.
Lump Sum priCe to weld pitted spots OD reservoir
floor as directed by owner .
Lump Sum ~...,;-..-....;
2,270.00
THANK YOU
($ 2,278~OO l
CITY OF BREM~RTON
WORK GHANGE DIREc'nVE
wcb#~ Two
Page 1 OJ 1
ProjfiKi f1: . 45126
Date: February 13, 2009
PROJECT: ReServoir 21.
CONTRACTOR; Coating:s Unlimited
YOUAREDIRECrED TO pROCeED PROMPTLY WrrH me FOL~~ cAANGE(s):
.P.r~sure waSt!EXtenor: OtTank
ATTACHMENT(S}:
Coatings Unlimited Change propOSal
.If a claim is m3de. ttiat the' abOve chahge(~) tlave affected ContractPrice or COntract TiJTJeS any claim for a Change Order
is ~ ~ wi. involve 0I'Ie. or ITlClI'8 of the foiowi!l9 methods of determinipg the e.ffect of the change{s); The
Change Order will be executed in accordance with $ectiQn 1-04.4otthe WSDOTStandard Specifications, or Article 10. of
the General Conditions." .
MethOd of determinin cha '. 'in Contract Price:
, .9 ., nge .
.0 Unit Price
[81' lump Sum
o Tme & Materials
o Other.
Method Of determining q.ange.in Coi1Iract TlJ1ieS:
o
o
Contractor's Records
Engineer's RecOrds
o
Other. '
Estimated increase '(d~) in Contract ,Prtce:
Estimafed.inaease (~ease) In ~Times:
~
6,732.00 .
Substantial Comptetion:
5 .l;iayS;
If the chari~ invOlveS an increase. the estimated
amou~tis not tp be ex~ without. further
authOl'ization.
Ready for final payment , days;
If the change invotves em Increase, ~ estimated times
are not 10 be ex6eeded Without furtherauthoriiatiorl.
RECOMMENDED:
AUTHORIZED:
By:. --
CONTRACTOR
CITY dFBREMERTON
By: ;~;2,/L..
/
all. F~. Win Chllnge,,[lire(;Iiv'8: ~
'COATINGS'UNLlPJIITED,IHe
CI~ofB~.rton
. ReaeNOlr 21lntertor COatIng Replaeement
Conttac1l\l 4512Ef .. .
Work: Exterior Pre.aure Wa.hlnll
ITEM.
Description
Units
Qty
Preuure W~Sh Exterior
ofTank
Labor
MaUln"
CHANGE ORDER REQUEST: tJ Oa..
[)a~:1-21-200~.
Eqt
5,500.00
Total
$5;500.00
qOI'1t/:a(:ttime exten.~n: 3 Da18
pomment Price Includeulllabor,MatertalsanQ !Equipment.
Items Total
Overhead s.ProfIt(ltem 1)@20%
Sub T otel
Ins 2%
TOTAl.,
$5,500.00 .
$1.100.()O
$6,600.00
$132.00
..;732.00
CITY OF 8REMERT<JN
WORK CHANGE D.IRECTIVE,
weD#.: Three
Page 1 Of 1
PROJECT: Reservoir 21
Project #: 45126
Date: February 13~ .2009
CONTRACTOR:. COatino.s Unlimited
YOU ARE DiRECTED'tO PROCEED PROIIPTL Y WITH lHE FOLLOWING CHANGE(S):
The ~t 10 sandblast theext~riQil'9o.f tQ aSP-6. up to the upp<< wekl seam of the knuckle and apply 1 coat 3to 4 mils
Tnemec 66 and 1 coat 1 to 3 mil Tnemec #73 including all labor, equipment and materials.
-- . -
ATTACHMENt(S}:,
Coatings Unlimited change proposal
'If a .cIaim.is made that the above change(s) have affeele(fContract Price or Contract Tm'ies anY claim for.a Change Order
is based thereon'will,involve one or more of the following ,methods 'of detennining the effect ofUle change{s). The ,
Change ()~erwill. be.axl3cUted in accordance with Sectioii1'-:04Aofthe WsDOr Standard SpecificatiOOsi or:,Articie10' of
the General Conditions,
MethOd of determining change in Contract Price:
Method of determining Ch~ in ContraCt Times:
o
~
o
o
Unit price.
lump SUJJl,
Tme & Materials
Other.
o
o
Contractor's Recorcl$
Engineer's Records
o
Other.
EStimated increase (decrease)in CQntract PriCe:
Estimated increase (decrease) in Contract.Tunes:
19 7. 50' 00' .... .c.... S-o c;"J '~25, 1(.,0, (.,.!
" . T '-"1:>.' ..'
sUbsta.ntia.1 ~pkroOf1:
14
days;
$
If the change mvolVes an increase, the estimated
an:Jount.isnot looo.exceede(fwithoutfurtner
authorization,
Reacjy for final payment ,days;.
if the change involves an increase, the estimated tim~
are not to be ex~ed withQJ.rt further alJ~riz:alion,
RECOMMENDED:
AUTHORIZED:
/'
I j
CONTRACTQR. I j! . (> '
'7 ~.
Q ~'
. /'. V
BY:..~, ,,'/..,
>...... 'V
Citi OF BR.EMERT,ON
By:
"7
'/,/c
/'
ab,FOR~. WOO; ~ oiredt.e, 3-00
Pa!!.<tO I ,)f i
Greg Snider
From; Greg. Snide~
Sent: Thursday,. February 12,,2009 11:36 AM
TO: Ned lever
Subject: Roof Coating
Ned,
Ttte cost ~ sandDiaslthe exterior roof to a 51'-6. up to !he upper weld seam of the knuckle
and apply 1 coat,3 to 4 mils Tnemec 66 and 1 el2 to 3 mil TnerrleC #73 including
all labor, equipmentaild materials is'$19;750.00 '
Plicing is based on utilizulg equipment already on site, please let uS knoW ASAP.
Thanks
Greg Snider
Coati.. Unl.lmlted Inc
18420 68th Ave So #110
KentWa.9~032 .
Ptl# (425)~51-3i6&
FX# (425)251-3269' ., . .... . . .' '
PriuiIegedjCanId Infol"l<diu.. may be alIltaifled In this message. If YOl,IIIfe not the adcfrnsee.1IldlcaIed iIlltU rneaage (or ~ for 0liIivelY
oflhe meseage toSU:hpenon)..you may notc:opy ordeliwlr Ihls message to anyone. In such case,you lIhOt.dddeslroy.~ message and nolifYlhe
sender by reply eIl13i. Please adv!Be itmIecIalely If you or yoIS employer do noc alf1MnIlo lnlemet emaiI for~ of lhis Idnd. OpinlooI, .'
COfJCbIoi1s. and oI1er~ in tJis JIJl!IISlige It,1a1 do noc R!lalelo.lbe oIIIdal tlusineu d Coatings I.JnlWniaed Ine. IIhaIl be understood as neiIlIlf
giIoIen nor erxIon!ect by 1. ...
4/3012009
.
.
.P'age ~
Greg Snider
From: Ned U~ver{Ned. Lever@ci,brem~rton.wa;us]
~nt: Tu~y. February 17,2009 3:55 PM
To; Greg Snider
Subjed: RE: Zinc Primer
lets go with.the zinc primer. Thanks.
Ned lEWer, P,E.
project Manager
Direct (360) 4;3--2398
Fax (360) 47J::5398
ned:Jever@ci.brernerton.,wa.us
- . '. .' .
. . _u __. , ___~~~_ __....___. __ n. . _ ~ ..______
. - - ,. ,
From: Greg Snider [mailto:gsnider@OOal:iri9sunlimited.aiin]
Sent: TUesday, February 17, 2009 1:19 PM
To: Ned Lever .
5u~ject: Zinc Primer
Importance: High
Ned;
The added cost to add a zinc primer coat to VYCDtf3would ~ $5,350,00
Please let 1.1$ '~ ASAP if possibie so we can order the zinc.
Thanks.
Greg Snider-
~Ungs Unlimlt$d Inc.
18420 68th Ave. SO #110
Kent ~ .98032
Phi (425)2~1:~
FX# (445)251~269 '._ ....., . ' . .
~ InfcirmaIiori Iriay: be coI1Iained in this message. "YOU alBllOC I1e addresseeindicaled in 1hi&message {or respoosibIe, fur deIiveIy
orb message Iosuc:ll pel'$on}~~Jnay not~ ordelNerthis melI$lIQelo anyone.ln.such.case. ~ shouId,dlmroylt!!s ~ arid notify lhe'
$8flIJef' by repty emal PIeese advise immeci8lely if you or yog' empIoyeJ do fIOIlmn&enl tolnlefn!ll.emai! for ~ Of ~~. 0pir1i0ns;
conclusions and olhef..inlDnnation iI D1iS l'IKl$sag'e Itat ~ not rela1l!1o the oIfii:iaI. bu$inesS ~ ~ UnI!imi'ed lnC. .~ beurdeislDod as neihlf
gillen nor endorse.o by it,
413012009.
COAnNGS UNLIMIT.ED.IN~
City of Bntmerton
R.~erVoifl~f Interior OO!liting Replacement
Contnlct# 4512!3,
Work: Ext,erl()r1Roof Sandblut& Paint
'ITEM
1
Description
Qty
Units
Labor Matllnv
C~N<3E ORDERREQUI;ST:, t 03
18,100.01
4,~l3..53
D8te~ 2~ 13-2009.'
Eqt
Total
~18,100.01
$4,40tt53
Exterior. Roof Sandblast & Paint
Add Zinc Primer .. , . ,...
Contra.cttime, extenslC1n:
Comm,ent: Prl~lnclu~<<I' ~lIlabor,Materlal. and Equipment..
ltemaTotal'
Overhead & Profit <"1) G 20%
SubTotal.
Ins 2~
T()TAL
$20,508.54
$4,101.31.
$24;e07.tll5
'$492;18
$25,1 OO~OO
I
I
I
I
I
I
I
I
I
I
I
I
-
I
I
I
I
I
I
CONTRACT
RESERVOIR No. 21
INTERIOR COATING REPLACEMENT
(Page 1 of 4)
This agreement, made and entered into in triplicate, this
6th
day of
October
, 20 08 . by and between the City of Bremerton, hereinafter
called the City, and Coatings Unlimited, Inc.
. hereinafter called the
Contractor:
Witnesseth:
That in consideration of the terms and conditions contained herein and attached and made a
part of this agreement, the parties hereto covenant and agree as follows:
I. The Contractor shall perform all work and furnish all labor, tools, materials and
equipment for the Reservoir No. 21 - Interior Coating ReJ>lacement.
All work to be in accordance with and as described in the attached plans, General
Provisions, Special Provisions and the 2006 Standard Specifications for Road, Bridge
and Municipal Construction (English), which are by this reference incorporated herein
and made a part hereof: and shall perform any alterations in or additions to the work
provided under this Contract and every part thereof
Contractor shall begin the work within ten (10) calendar days after the date that written
NOTICE TO PROCEED is issued to the Contractor by the City. The Contractor shall
complete the work no later than eighty (80) calendar days after the date that NOTICE
TO PROCEED is issued.
If said work is not completed within the time specified, the Contractor agrees to pay to
the City an amount in accordance with Section 00100, Part 1-2.06(E) of these
Contract Documents for each calendar day said work remains incomplete after
expiration of the specified times as liquidated damages.
The Contractor shall provide and bear the expense of all labor, materials, equipment,
and tools of any sort whatsoever that may be required for the transfer of materials and
for construction and completing the work provided for in this Contract and every part
thereof: except such as are mentioned in the specifications to be furnished by the City.
45126 - BREMERTON-RESERVOIR No. 21
Interior Costing Replacement
Bidders Checklist & Bid/Contract Forms
00300-17
CONTRACT
(Page 2 of 4)
ll. The City hereby promises and agrees with the Contractor to employ and does employ
the Contractor to provide the materials and to do and cause to be done the above
described work to complete and finish the same according to the attached plans and
specifications and the terms and conditions herein contained and hereby contracts to
pay for the same according to the attached specifications and the approved bid as
attached hereto incorporated by reference, at the time and in the manner and upon the
conditions provided for in this Contract.
ill. The Contractor for himself: and for his heirs, exe6utors, administrators, successors, and
assigns, does hereby agree to fulfill the performance of all covenants herein contained
upon the part of the Contractor.
IV. It is further provided that no liability shall attach to the City ofBremerton by reason of
entering into this Contract, except as expressly provided herein.
V. INSURANCE AND INDEMNIFICATION
The Contractor shall procure and maintain, during the term and conditions of this
Contract the required insurance and indemnification as adopted by reference in the
General Conditions.
VI. GENERAL CONDmONS
A. Reports and Information: When requested by the City, Contractor shall
furnish periodic reports and documents on matters covered by this
Contract. The reports and documents shall be furnished in the time and
form requested. Contractor shall maintain accounting records in
accordance with Generally Accepted Accounting Principles (GAAP) to
substantiate all billed amounts.
B. Entire Contract: This Contract constitute the entire agreement between the
Parties, and the Parties acknowledge that there are no other agreements,
written or oral, that have not been set forth in the text of this Contract.
The section headings and article titles of this Contract shall have no effect
upon the construction or interpretation of any part hereof
C. Severability: Should any part of this Contract be found void, the balance of
the Agreement shall remain in full force and effect.
D. Modification: This Contract may only be modified by written instrument
signed by both Parties.
E. Waiver: Failure to enforce any provision of this Contract shall not be
deemed a waiver of that provision. Waiver of any right or power arising
out of this Agreement shall not be deemed waiver of any other right or
power.
45126 - BREMERTON-RESERVOIR No. 21
Interior Coating Replacement
Bidders Checklist & Bid/Contract Forms
00300-18
II
i:
Ii
-'
: '
I :
I:
I:
II
Ii
. I
F.
G.
VIT.
IX.
i!
II
II
Ii
t:
Ii
I!
II
II
II
II
CONTRACT
(Page 3 of 4)
Compliance with Laws: Contractor shall comply ~ith all applicable
Federal, State, and local laws in performing its obligations under this
Contract.
Choice of Law and Venue: This Contract shall be interpreted according to
the laws of the State of Washington. Any judicial action to resolve
disputes arising out of this Contr~ct shall be brought in Kitsap County
Superior Court.
WARRANTY
The Contractor shall warrant the work for a period of two (2) years as referenced
in the General Conditions. If the Contractor does not accomplish the corrections
within a reasonable time, the City may complete the corrections and the Contractor
shall pay all costs by the City in order to accomplish the correction.
TERMINATION
The City may terminate this Contract without notice for good cause. "Good
Cause" shall include, without limitation, anyone or more of the following events:
A.
The Contractor's failure to supply sufficient skilled workers or suitable
materials or equipment.
The Contractor's failure to prosecute the work with such diligence as will
ensure its physical completion within the original physical completion time
specified in this Agreement and any extensions of time which may have
been granted to the Contractor by change order or otherwise.
The Contractor's failure to make full and prompt payment to
subcontractors or for material or labor.
B.
C.
D.
The Contractor's disregard of federal, state or local laws, rules or
regulations.
E.
F.
The Contractor's filing for bankruptcy or becoming adjudged bankrupt.
The Contractor disregards the authority of the City.
The Contractor performs work which deviates from the Contract, and
neglects or refuses to correct rejected work.
G.
H.
1.
The Contractor's failure to provide continuous competent supervision.
The Contractor otherwise violates in any material way any provisions or
requirements of the contract.
46126 - BREMERTON-RESERVOIR No. 21
Interior Coating Replacement
Bidders Checklist & Bid/Contract Forms
00300-19
11
I'
I
I
I
-
I
I
I
I
I
I'
I,
I:
CONTRACT
(Page 4 of 4)
If the City terminates this Contract for good cause, the Contractor shall not receive any
monies due under this Contract, if any, until the Contract work is completed.
In witness whereof the parties hereto have caused this agreement to be executed the day and
year first herein above written.
CONTRACTOR
Coatings Unlimited, Inc.
By:
Title:
President
Date:
10-6-08
ATTEST:
duldflrw
City CI
II
APPROVED:
II
. Attorney
Ii
I (
45126. BREMERTON-RESERVOIR No, 21
Interior Coating Replacement
Bidders Checklist & Bid/Contract Forms
I:
00300-20