HomeMy WebLinkAbout4755 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4755 COLUMBIA PUMPING & CONSTRUCTION INC Rehabilitate Ductile Iron Sewer Force Main Engineering LEG 12-1 08/28/2008 09/30/2008 02/15/2010 01/01/2010 PUBLIC WORKS AGREEMENT THIS AGREEMENT, is entered into between the City of Bremerton, a Washington Municipal Corporation ("City"), and Columbia Pumping and Construction, Inc. ("Contractor"), whose mailing address is: 1005 S. Maitland Avenue - Pasco. W A 99301. The parties agree as follows: 1. CONTRACTOR SERVICES. The Contractor shall perform the following services for the City: Rehabilitate 420 lineal feet of 14"ductile iron sewer force main using CIPP lining. Activities shall include cleaning, pre-lining inspection to determine whether the pipe can be successfully lined, lining, and post-lining inspection. The City will support the Contractor as follows: Excavating and shoring pits on the upstream and downstream end of the pipe section to be lined; holding flow during the duration of the work; cutting the pipe where requested by the Contractor; traffic control. Force main characteristics and a site plan are included in the Appendix C. 2. TIME OF COMPLETION. Time is of the essence for completion of this project. The Contractor shall complete the work within 30 calendar days from the date of issuance of the City's Notice to Proceed. 3. COMPENSATION. The City shall pay the Contractor an amount not to exceed $72,891.21, which includes applicable Washington State Sales Tax, for the work and services contemplated in this agreement. Reference the payment schedule in Appendix B. The City payment shall not constitute a waiver of the City's right to final inspection and acceptance of the project. A. Performance Bond. Pursuant to Chapter 39.08 RCW, the Contractor, shall provide the City a performance bond for the full contract amount to be in effect until sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor and Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Retainage. The City shall hold back a retainage in the amount of five percent (5%) of any and all payments made to contractor for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor & Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. C. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. Public Works Agreement City of BremertonlColumbia Pumping and Construction August 22, 2008 Page 1 of7 D. Final Payment: Waiver of Claims. THE ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RET AINAGE) SHALL CONSTITUTE A WAIVER OF CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS MADE. 4. INDEPENDENT CONTRACTOR. Contractor is and shall be at all times acting as an independent contractor and not as an employee of the City. The Contractor shall secure at its expense, and shall be responsible for all payments of income tax, social security, state industrial insurance compensation, unemployment compensation, and all other payroll deductions for the Contractor, officer, agents, employees and sub-contractors. The Contractor shall also secure all applicable business licenses, if required, in connection with the contract services, including all required licenses for Contractor's officers, agents, employees and sub-contractors. 5. TERMINATION. The City may terminate this agreement without notice for good cause. "Good cause" shall include, without limitation, anyone or more of the following events: A. The Contractor's failure to supply sufficient skilled workers or suitable materials or equipment. B. The Contractor's failure to prosecute the work with such diligence as will ensure its physical completion within the original physical completion time specified in this Agreement and any extensions of time which may have been granted to the Contractor by change order or otherwise. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor disregards the authority of the City. G. The Contractor performs work which deviates from the Contract, and neglects or refuses to correct rejected work. H. The Contractor's failure to provide continuous competent supervision. I. The Contractor otherwise violates in any material way any provisions or requirements of the contract. If the City terminates this agreement for good cause, the Contractor shall not receive any monies due under this agreement, if any, until the Contract work is completed. 6. PREY AILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. 7. CHANGES. The City may issue a written or oral work change directive for any change in the Contract work during the performance of this agreement. If the Contractor determines, for any reason, Public Work\' Agreement City of BremertonlColumbia Pumping and Construction August 22, 2008 Page 2 of7 that a change order is necessary, Contractor must submit a written change order request to the City's project manager within two (2) business days of the date the Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written or oral work change directive from the City or a change order from the City. If the Contractor fails to require a change order within the time allowed, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided below: A. Procedure and Protest by the Contractor. If the Contractor disagrees with anything required by a written work change directive, oral work change directive or change order, including any direction, instruction, interpretation, or determination by the City, the Contractor shall: 1. Give a signed written notice of protest to the City within one business day; 2. Supplement the written protest within five (5) calendar days with a written statement that provides the following information: a. The date of the Contract's protest. b. The nature and circumstances that caused the protest. c. The provisions in this agreement that support the protest. d. The estimated dollar cost, if any, of the protested work and how that estimate was determined. e. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. The Contractor shall keep complete records of extra costs and time incurred as a result of the protested work. The City shall have access to any of the Contractor's records needed for evaluating the protest. 3. The City will evaluate all protests, provided the procedures in this section are followed. If the City determines that a protest is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. B. Contractor's Duty to Complete Protested Work. In spite of any protest, the Contractor shall proceed promptly with the work as the City has ordered. C. Contractor's Accevtance of Changes. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any Public Works Agreement City of BremertonlColumbia Pumping and Construction August 22, 2008 Page3 of7 written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts form the City any written or oral order (including directions, instructions, interpretations, and determination). 8. CLAIMS. The Contractor shall give written notice to the City of all claims other than change orders within fourteen (14) calendar days of the occurrence of the events giving rise to the claims. Any claim for damages, additional payment for any reason, or extension of time, whether under this agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this agreement; or, if (and only if) no such provision is applicable, unless that claim is set forth in detail in writing and received by the City within seven (7) calendar days from the date Contractor knew, or should have known, of the facts giving rise to the claim. At a minimum, a Contractor's written claim must include the information set forth regarding protests in Section 7.A.2.a.-e. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. Contractor must, in any event, file any claim or bring any suit arising from or connected with this agreement within 120 calendar days from the date the contract work is complete. 9. WARRANTY. The Contractor shall correct all defects in workmanship and materials within one year from the date of the Contractor's acceptance of the City's final payment under this contract. When defects are corrected, the warranty for that portion of the work shall extend for one year form the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. 10. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits including all legal costs and attorney fees, arising out of or in connection with the performance of this agreement, except for injuries and damages solely caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS INDEMNIFICATION CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF THIS INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this agreement. Public Works Agreement City of BremertonlColumbia Pumping and Construction August 22, 2008 Page 40f7 11. INSURANCE. The Contractor shall procure and maintain for the duration of this agreement, insurance against claims for injuries to persons or damage to property that may arise from or in connection with the performance of the Contract work by the Contractor, its agents, representatives, employees or subcontractors. Before beginning the work on the project described in this agreement, the Contractor shall provide a Certificate of Insurance evidencing: A. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and B. Commercial General Liability insurance written on an occurrence basis with limits no less than $2,000,000 combined single limit per occurrence and $2,000,000 aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCV) if applicable; and employer's liability. Any payment of deductible or self insured retention shall be the sole responsibility of the Contractor. The City reserves the right to receive a certified copy of all the required insurance policies. The City, its officials, employees, agents and volunteers shall be named as an additional insured on the insurance policy, as respects work performed by or on behalf of the Contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The Contractor's insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Contractor's insurance shall be primary insurance as respects the City, and the City shall be given thirty (30) calendar days prior written notice by certified mail, return receipt requested, of any cancellation, suspension or material change in coverage. If this contract requires work to be performed in or on navigable waters, the Contractor shall provide insurance written on an occurrence basis with limits no less than $2,000,000 combined single limit per occurrence and $2,000,000 aggregate for claims made under the Longshoreman and Harbor Workers Act and the Jones Act. 12. MISCELLANEOUS. A. Nondiscrimination. In the hiring of employees for the performance of work under this Agreement or any sub-contract hereunder, the Contractor, its sub-contractors, or any person acting on behalf of such Contractor or sub-contractor shall not, by reason of race, religion, color, sex, national origin, or the presence of any sensory, mental, physical disability, or sexual orientation discriminate against any person who is qualified and available to perform the work to which the employment relates. B. Compliance with Laws. Contractor shall comply with all federal, state and local laws, rules and regulations throughout every aspect in the performance of this agreement. Public Works Agreement City of BremertonlColumbia Pumping and Construction August 22, 2008 Page 5 of7 C. Work Performed at Contractor's Risk. Contractor shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of this agreement. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. D. Nonwaiver of Breach. The failure of the City to insist upon strict performance of any of the terms and rights contained herein, or to exercise any option herein conferred in one or more instances, shall not be constructed to be a waiver or relinquishment of those terms and rights and they shall remain in full force and effect E. Governing Law. This agreement shall be governed and construed in accordance with the laws of the State of Washington. If any dispute arises between the City and Contractor under any of the provisions of this agreement, resolution of that dispute shall be available only through the jurisdiction, venue and rules of the Kitsap County Superior Court, Kitsap County, Washington. F. Attorney's Fees. To the extent not inconsistent with RCW 39.04.240, in any claim or lawsuit for damages arising from the parties' performance of this agreement, each party shall be responsible for payment of its own legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit; however, nothing in this subsection shall limit the City's right to indemnification under Section 10 of this agreement. G. Written Notice. All communications regarding this agreement shall be sent to the parties at the addresses listed on the signature page of this agreement, unless otherwise notified. Any written notice shall become effective upon delivery, but in any event three (3) calendar days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated on this agreement. H. Assignment. Any assignment of this agreement by the Contractor without the written consent of the City shall be void. I. Modification. No waiver, alteration, or modification of any of the provisions of this agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. J. Severability. If anyone or more sections, sub-sections, or sentences of this agreement are held to be unconstitutional or invalid, that decision shall not affect the validity of the remaining portion of this agreement and the remainder shall remain in full force and effect. K. Entire Agreement. The written provisions and terms of this agreement, together with any attached Exhibits, supersede all prior verbal statements by any representative of the City, and those statements shall not be construed as forming a part of or altering in any manner this agreement. This agreement and any attached Exhibits contain the entire agreement between the parties. Should any language in any Exhibit to this agreement conflict with any language contained in this agreement, the terms of this agreement shall prevail. Public Works Agreement City of Bremerton/Columbia Pumping and Construction August 22, 2008 Page 60f7 RX DateITime 08/25/2008 08:19 08/25/2008 5095477381 11 :30 5095477381 P.002 PAGE 02/02 IN WITNESS WHEREOF, the parties below have executed this agreem.ent rint~<:!....I1:A;_ ide:' . , DATE Sf ds/_~ DATE Notices to be sent to: Notices to be sent to: CONTRACTOR: CITY OF BREMERTON: Columbia Pumping and Construction, Inc. A TTN: Frank Long 1005 S. Maitland Avenue Pasca, W A 99301 City Clerk A TIN: Caroi Etgen 345 Sixth Street Bremerton, WA 98337 Dept. ofPW&U - Engineering Division ATTN: Bm Davis 3027 Olympus Drive BremenOT:l, WA 98310 APPROVED AS TO FORM: ATTEST: ~f1rJ Public Work..~ Agreement City of BremertonlCo[umbia Pl/mping and Constf7Jctian August 22. 2008 Page 70f7 APPENDIX A PREY AILING WAGES FOR KITSAP COUNTY State of Washington DEPARTMENT OF LABOR AND INDUSTRIES Prevailing Wage Section - Telephone (360) 902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage Rates For Public Works Contracts The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, workers' wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements is provided on the Benefit Code Key. KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** Classification ASBESTOS ABATEMENT WORKERS JOURNEY LEVEL BOILERMAKERS JOURNEY LEVEL BRICK AND MARBLE MASONS JOURNEY LEVEL CABINET MAKERS (IN SHOP) JOURNEY LEVEL CARPENTERS ACOUSTICAL WORKER BRIDGE, DOCK AND WARF CARPENTERS CARPENTER CREOSOTED MATERIAL DRYWALL APPLICATOR FLOOR FINISHER FLOOR LAYER FLOOR SANDER MILLWRIGHT AND MACHINE ERECTORS PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING SAWFILER SHINGLER STATIONARY POWER SAW OPERATOR STATIONARY WOODWORKING TOOLS CEMENT MASONS JOURNEY LEVEL DIVERS & TENDERS DIVER DIVER TENDER DREDGE WORKERS ASSISTANT ENGINEER ASSISTANT MATE (DECKHAND) BOATMEN ENGINEER WELDER LEVERMAN, HYDRAULIC MAINTENANCE MATES OILER DRYWALL TAPERS JOURNEY LEVEL ELECTRICAL FIXTURE MAINTENANCE WORKERS JOURNEY LEVEL Page 1 PREVAILING WAGE (See Benefit Code Key) Over Time Holiday Note Code Code Code $36.24 1H 50 $30.34 $43.75 1M 5A $12.53 $43.91 $43.75 $43.75 $43.85 $43.79 $43.75 $43.75 $43.75 $44.75 $43.95 $43.75 $43.75 $43.75 $43.75 1M 5D 1M 50 1M 5D 1M 5D 1M 5D 1M 5D 1M 50 1M 50 1M 5D 1M 50 1M 5D 1M 50 1M 5D 1M 5D 1M 5D 1M 5D 8A 1M 50 1T 50 8L 1T 5D 8L 1T 50 8L 1T 5D 8L 1T 5D 8L 1T 50 8L 1T 50 8L 1T 50 8L 1E 5P $44.58 $85.75 $44.22 $44.59 $44.08 $44.59 $44.64 $46.21 $44.08 $44.59 $44.21 $43.59 $9.37 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code ELECTRICIANS - INSIDE CABLE SPLICER $55.05 1E SA CABLE SPLICER (TUNNEL) $58.86 1E SA CERTIFIED WELDER $53.16 1E SA CERTIFIED WELDER (TUNNEL) $57.15 1E 5A CONSTRUCTION STOCK PERSON $28.83 1E SA JOURNEY LEVEL $51.25 1E SA JOURNEY LEVEL (TUNNEL) $55.05 1E SA ELECTRICIANS - MOTOR SHOP CRAFTSMAN $15.37 2A 6C JOURNEY LEVEL $14.69 2A 6C ELECTRICIANS - POWERLlNE CONSTRUCTION CABLE SPLICER $56.53 4A SA CERTIFIED LINE WELDER $51.64 4A SA GROUNDPERSON $37.15 4A SA HEAD GROUNDPERSON $39.19 4A SA HEAVY LINE EQUIPMENT OPERATOR $51.64 4A SA JACKHAMMER OPERATOR $39.19 4A SA JOURNEY LEVEL L1NEPERSON $51.64 4A SA LINE EQUIPMENT OPERATOR $43.83 4A SA POLE SPRAYER $51.64 4A SA POWDERPERSON $39.19 4A SA ELECTRONIC TECHNICIANS ELECTRONIC TECHNICIANS JOURNEY LEVEL $40.08 10 SA ELEVATOR CONSTRUCTORS MECHANIC $60.85 4A 6Q MECHANIC IN CHARGE $66.25 4A 6Q FABRICATED PRECAST CONCRETE PRODUCTS ALL CLASSIFICATIONS $13.50 FENCE ERECTORS FENCE ERECTOR $13.80 FENCE LABORER $11.60 FLAGGERS JOURNEY LEVEL $31.01 1H 5D GLAZIERS JOURNEY LEVEL $43.76 1H 5G HEAT & FROST INSULATORS AND ASBESTOS WORKERS MECHANIC $46.59 1S 5J HEATING EQUIPMENT MECHANICS MECHANIC $18.45 HOD CARRIERS & MASON TENDERS JOURNEY LEVEL $36.75 1H 5D INDUSTRIAL ENGINE AND MACHINE MECHANICS MECHANIC $15.65 INDUSTRIAL POWER VACUUM CLEANER JOURNEY LEVEL $9.24 INLAND BOATMEN CAPTAIN $38.87 1K 5B COOK $32.73 1K 5B DECKHAND $32.42 1K 5B ENGINEER/DECKHAND $35.20 1K 5B MATE, LAUNCH OPERATOR $36.85 1K 5B Page 2 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** Classification INSPECTION/CLEANING/SEALING OF SEWER & WATER SYSTEMS BY REMOTE CONTROL CLEANER OPERATOR, FOAMER OPERATOR GROUT TRUCK OPERATOR HEAD OPERATOR TECHNICIAN TV TRUCK OPERATOR INSULATION APPLICATORS JOURNEY LEVEL IRONWORKERS JOURNEY LEVEL LABORERS ASPHALT RAKER BALLAST REGULATOR MACHINE BATCH WEIGHMAN BRUSH CUTTER BRUSH HOG FEEDER BURNERS CARPENTER TENDER CASSION WORKER CEMENT DUMPER/PAVING CEMENT FINISHER TENDER CHANGE-HOUSE MAN OR DRY SHACKMAN CHIPPING GUN (OVER 30 LBS) CHIPPING GUN (UNDER 30 LBS) CHOKER SETTER CHUCK TENDER CLEAN-UP LABORER CONCRETE DUMPER/CHUTE OPERATOR CONCRETE FORM STRIPPER CONCRETE SAW OPERATOR CRUSHER FEEDER CURING LABORER DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED MATERIALS) DITCH DIGGER DIVER DRILL OPERATOR (HYDRAULIC, DIAMOND) DRILL OPERATOR, AIRTRAC DUMPMAN EPOXY TECHNICIAN EROSION CONTROL WORKER FALLER/BUCKER, CHAIN SAW FINAL DETAIL CLEANUP (Le., dusting, vacuuming, window cleaning; NOT construction debris cleanup) FINE GRADERS FIRE WATCH FORM SETTER GAB ION BASKET BUILDER GENERAL LABORER GRADE CHECKER & TRANSIT PERSON GRINDERS GROUT MACHINE TENDER Page 3 PREVAILING WAGE $9.73 $11.48 $12.78 $8.07 $24.17 $43.75 $47.92 $36.75 $36.24 $31.01 $36.24 $36.24 $36.24 $36.24 $37.20 $36.75 $36.24 $36.24 $36.75 $36.24 $36.24 $36.24 $36.24 $36.75 $36.24 $36.75 $31.01 $36.24 $36.24 $36.24 $37.20 $36.75 $37.20 $36.24 $36.24 $36.24 $36.75 $28.45 $36.24 $31.01 $36.24 $36.24 $36.24 $36.75 $36.24 $36.24 (See Benefit Code Key) Over Time Holiday Note Code Code Code 1M 50 10 5A 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 5D 1H 50 1H 50 1H 50 1H 5D 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code GUARDRAIL ERECTOR $36.24 1H 50 HAZARDOUS WASTE WORKER LEVEL A $37.20 1H 50 HAZARDOUS WASTE WORKER LEVEL B $36.75 1H 50 HAZARDOUS WASTE WORKER LEVEL C $36.24 1H 50 HIGH SCALER $37.20 1H 50 HOD CARRIER/MORTARMAN $36.75 1H 50 JACKHAMMER $36.75 1H 50 LASER BEAM OPERATOR $36.75 1H 50 MANHOLE BUILDER-MUOMAN $36.75 1H 50 MATERIAL YARDMAN $36.24 1H 50 MINER $37.20 1H 50 NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH $36.75 1H 50 PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST, GUNITE, SHOTCRETE, WATER BLASTER PAVEMENT BREAKER $36.75 1H 50 PILOT CAR $31.01 1H 50 PIPE POT TENDER $36.75 1H 50 PIPE RELlNER (NOT INSERT TYPE) $36.75 1H 50 PIPELAYER & CAULKER $36.75 1H 50 PIPELAYER & CAULKER (LEAD) $37.20 1H 50 PIPEWRAPPER $36.75 1H 50 POT TENDER $36.24 1H 50 POWOERMAN $37.20 1H 50 POWOERMAN HELPER $36.24 1H 50 POWERJACKS $36.75 1H 50 RAILROAD SPIKE PULLER (POWER) $36.75 1H 50 RE-TIMBERMAN $37.20 1H 50 RIPRAP MAN $36.24 1H 50 ROOOER $36.75 1H 50 SCAFFOLD ERECTOR $36.24 1H 50 SCALE PERSON $36.24 1H 50 SIGNALMAN $36.24 1H 50 SLOPER (OVER 20") $36.75 1H 50 SLOPER SPRAYMAN $36.24 1H 50 SPREADER (CLARY POWER OR SIMILAR TYPES) $36.75 1H 50 SPREADER (CONCRETE) $36.75 1H 50 STAKE HOPPER $36.24 1H 50 STOCKPILER $36.24 1H 50 TAMPER & SIMILAR ELECTRIC, AIR & GAS $36.75 1H 50 TAMPER (MULTIPLE & SELF PROPELLED) $36.75 1H 50 TOOLROOM MAN (AT JOB SITE) $36.24 1H 50 TOPPER-TAILER $36.24 1H 50 TRACK LABORER $36.24 1H 50 TRACK LINER (POWER) $36.75 1H 50 TRUCK SPOTTER $36.24 1H 50 TUGGER OPERATOR $36.75 1H 50 VIBRATING SCREED (AIR, GAS, OR ELECTRIC) $36.24 1H 50 VIBRATOR $36.75 1H 50 VINYL SEAMER $36.24 1H 50 WELDER $36.24 1H 50 WELL-POINT LABORER $36.75 1H 50 Page 4 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code LABORERS - UNDERGROUND SEWER & WATER GENERAL LABORER $36.24 1H 5D PIPE LAYER $36.75 1H 5D LANDSCAPE CONSTRUCTION IRRIGATION OR LAWN SPRINKLER INSTALLERS $9.25 LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $10.05 LANDSCAPING OR PLANTING LABORERS $12.92 LATHERS JOURNEY LEVEL $43.79 1M 5D METAL FABRICATION (IN SHOP) FITTER $26.96 LABORER $8.07 MACHINE OPERATOR $13.83 WELDER $13.83 MODULAR BUILDINGS CABINET ASSEMBLY $11.56 ELECTRICIAN $11.56 EQUIPMENT MAINTENANCE $11.56 PLUMBER $11.56 PRODUCTION WORKER $9.40 TOOL MAINTENANCE $11.56 UTILITY PERSON $11.56 WELDER $11.56 PAINTERS JOURNEY LEVEL $33.94 2B 5A PLASTERERS JOURNEY LEVEL $43.10 1R 5B PLAYGROUND & PARK EQUIPMENT INSTALLERS JOURNEY LEVEL $8.54 PLUMBERS & PIPEFITTERS JOURNEY LEVEL $50.92 1G 5A POWER EQUIPMENT OPERATORS ASSISTANT ENGINEERS $42.14 1T 5D 8L BACKHOE, EXCAVATOR, SHOVEL (3 YD & UNDER) $44.92 1T 5D 8L BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YD & UNDER 6 YD) $45.41 1T 5D 8L BACKHOE, EXCAVATOR, SHOVEL (6 YD AND OVER WITH ATTACHMENTS) $45.96 1T 5D 8L BACKHOES, (75 HP & UNDER) $44.50 1T 5D 8L BACKHOES, (OVER 75 HP) $44.92 1T 5D 8L BARRIER MACHINE (ZIPPER) $44.92 1T 5D 8L BATCH PLANT OPERATOR, CONCRETE $44.92 1T 5D 8L BELT LOADERS (ELEVATING TYPE) $44.50 1T 5D 8L BOBCAT (SKID STEER) $42.14 1T 5D 8L BROOMS $42.14 1T 5D 8L BUMP CUTTER $44.92 1T 5D 8L CABLEWAYS $45.41 1T 50 8L CHIPPER $44.92 1T 50 8L COMPRESSORS $42.14 1T 5D 8L CONCRETE FINISH MACHINE - LASER SCREED $42.14 1T 50 8L CONCRETE PUMPS $44.50 1T 50 8L CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT $44.92 1T 50 8L CONVEYORS $44.50 1T 5D 8L CRANES, THRU 19 TONS, WITH ATTACHMENTS $44.50 1T 50 8L Page 5 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code CRANES, 20 - 44 TONS, WITH ATTACHMENTS $44.92 1T 5D 8L CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB $45.41 1T 5D 8L WITH ATACHMENTS) CRANES, 100 TONS - 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB $45.96 1T 5D 8L WITH ATTACHMENTS) CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $46.53 1T 5D 8L WITH ATTACHMENTS) CRANES, A-FRAME, 10 TON AND UNDER $42.14 1T 5D 8L CRANES, A-FRAME, OVER 10 TON $44.50 1T 5D 8L CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $47.09 1T 5D 8L ATTACHMENTS CRANES, OVERHEAD, BRIDGE TYPE ( 20 - 44 TONS) $44.92 1T 5D 8L CRANES, OVERHEAD, BRIDGE TYPE ( 45 - 99 TONS) $45.41 1T 5D 8L CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) $45.96 1T 5D 8L CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM $45.96 1T 5D 8L CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM $46.53 1T 5D 8L CRUSHERS $44.92 1T 5D 8L DECK ENGINEER/DECK WINCHES (POWER) $44.92 1T 5D 8L DERRICK, BUILDING $45.41 1T 5D 8L DOZERS, D-9 & UNDER $44.50 1T 5D 8L DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT $44.50 1T 5D 8L DRILLING MACHINE $44.92 1T 5D 8L ELEVATOR AND MANLlFT, PERMANENT AND SHAFT-TYPE $42.14 1T 5D 8L EQUIPMENT SERVICE ENGINEER (OILER) $44.50 1T 5D 8L FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP $44.92 1T 5D 8L FORK LIFTS, (3000 LBS AND OVER) $44.50 1T 5D 8L FORK LIFTS, (UNDER 3000 LBS) $42.14 1T 5D 8L GRADE ENGINEER $44.50 1T 5D 8L GRADECHECKER AND STAKEMAN $42.14 1T 5D 8L GUARDRAIL PUNCH $44.92 1T 5D 8L HOISTS, OUTSIDE (ELEVATORS AND MANLlFTS), AIR TUGGERS $44.50 1T 5D 8L HORIZONTAL/DIRECTIONAL DRILL LOCATOR $44.50 1T 50 8L HORIZONTAL/DIRECTIONAL DRILL OPERATOR $44.92 1T 50 8L HYDRALlFTS/BOOM TRUCKS (10 TON & UNDER) $42.14 1T 50 8L HYDRALlFTS/BOOM TRUCKS (OVER 10 TON) $44.50 1T 5D 8L LOADERS, OVERHEAD (6 YO UP TO 8 YD) $45.41 1T 5D 8L LOADERS, OVERHEAD (8 YD & OVER) $45.96 1T 5D 8L LOADERS, OVERHEAD (UNDER 6 YD), PLANT FEED $44.92 1T 5D 8L LOCOMOTIVES, ALL $44.92 1T 5D 8L MECHANICS, ALL $45.41 1T 5D 8L MIXERS, ASPHALT PLANT $44.92 1T 5D 8L MOTOR PATROL GRADER (FINISHING) $44.92 1T 5D 8L MOTOR PATROL GRADER (NON-FINISHING) $44.50 1T 5D 8L MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD $45.41 1T 5D 8L OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $42.14 1T 5D 8L OPERATOR PAVEMENT BREAKER $42.14 1T 5D 8L PILEDRIVER (OTHER THAN CRANE MOUNT) $44.92 1T 5D 8L PLANT OILER (ASPHALT, CRUSHER) $44.50 1T 5D 8L POSTHOLE DIGGER, MECHANICAL $42.14 1T 5D 8L POWER PLANT $42.14 1T 5D 8L PUMPS, WATER $42.14 1T 5D 8L QUAD 9, D-10, AND HD-41 $45.41 1T 5D 8L Page 6 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $45.41 1T 5D 8L EQUIP RIGGER AND BELLMAN $42.14 1T 5D 8L ROLLAGON $45.41 1T 5D 8L ROLLER, OTHER THAN PLANT ROAD MIX $42.14 1T 5D 8L ROLLERS, PLANTMIX OR MUL TILlFT MATERIALS $44.50 1T 5D 8L ROTO-MILL, ROTO-GRINDER $44.92 1T 5D 8L SAWS, CONCRETE $44.50 1T 5D 8L SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING $44.92 1T 5D 8L OFF-ROAD EQUIPMENT ( UNDER 45 YD) SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING $45.41 1T 5D 8L OFF-ROAD EQUIPMENT (45 YD AND OVER) SCRAPERS, CONCRETE AND CARRY ALL $44.50 1T 5D 8L SCREED MAN $44.92 1T 5D 8L SHOTCRETE GUNITE $42.14 1T 5D 8L SLlPFORM PAVERS $45.41 1T 5D 8L SPREADER, TOPSIDE OPERATOR - BLAW KNOX $44.92 1T 5D 8L SUBGRADE TRIMMER $44.92 1T 5D 8L TOWER BUCKET ELEVATORS $44.50 1T 5D 8L TRACTORS, (75 HP & UNDER) $44.50 1T 5D 8L TRACTORS, (OVER 75 HP) $44.92 1T 5D 8L TRANSFER MATERIAL SERVICE MACHINE $44.92 1T 5D 8L TRANSPORTERS, ALL TRACK OR TRUCK TYPE $45.41 1T 5D 8L TRENCHING MACHINES $44.50 1T 5D 8L TRUCK CRANE OILER/DRIVER ( UNDER 100 TON) $44.50 1T 5D 8L TRUCK CRANE OILER/DRIVER (100 TON & OVER) $44.92 1T 5D 8L TRUCK MOUNT PORTABLE CONVEYER $44.92 1T 5D 8L WHEEL TRACTORS, FARMALL TYPE $42.14 1T 5D 8L YO YO PAY DOZER $44.92 1T 5D 8L POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER (SEE POWER EQUIPMENT OPERATORS) POWER LINE CLEARANCE TREE TRIMMERS JOURNEY LEVEL IN CHARGE $37.61 4A SA SPRAY PERSON $35.73 4A SA TREE EQUIPMENT OPERATOR $36.19 4A SA TREE TRIMMER $33.68 4A 5A TREE TRIMMER GROUNDPERSON $25.43 4A 5A REFRIGERATION & AIR CONDITIONING MECHANICS MECHANIC $50.92 1G SA RESIDENTIAL BRICK & MARBLE MASONS JOURNEY LEVEL $17.04 RESIDENTIAL CARPENTERS JOURNEY LEVEL $20.00 RESIDENTIAL CEMENT MASONS JOURNEY LEVEL $30.87 RESIDENTIAL DRYWALL TAPERS JOURNEY LEVEL $20.00 RESIDENTIAL ELECTRICIANS JOURNEY LEVEL $14.00 RESIDENTIAL GLAZIERS JOURNEY LEVEL $31.99 1H 5G RESIDENTIAL INSULATION APPLICATORS JOURNEY LEVEL $13.96 Page 7 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** Classification PREVAILING WAGE (See Benefit Code Key) Over Time Holiday Note Code Code Code RESIDENTIAL LABORERS JOURNEY LEVEL RESIDENTIAL PAINTERS JOURNEY LEVEL RESIDENTIAL PLUMBERS & PIPEFITTERS JOURNEY LEVEL RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) RESIDENTIAL SOFT FLOOR LAYERS JOURNEY LEVEL RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL RESIDENTIAL TERRAZZOITILE FINISHERS JOURNEY LEVEL ROOFERS JOURNEY LEVEL USING IRRITABLE BITUMINOUS MATERIALS SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) SHIPBUILDING & SHIP REPAIR CARPENTER ELECTRICIAN HEAT & FROST INSULATOR LABORER MACHINIST OPERATOR PAINTER PIPEFITTER RIGGER SHEET METAL SHIPFITTER WELDER/BURNER SIGN MAKERS & INSTALLERS (ELECTRICAL) JOURNEY LEVEL SIGN MAKERS & INSTALLERS (NON-ELECTRICAL) JOURNEY LEVEL SOFT FLOOR LAYERS JOURNEY LEVEL SOLAR CONTROLS FOR WINDOWS JOURNEY LEVEL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL STAGE RIGGING MECHANICS (NON STRUCTURAL) JOURNEY LEVEL SURVEYORS CHAIN PERSON INSTRUMENT PERSON PARTY CHIEF TELECOMMUNICATION TECHNICIANS TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL TELEPHONE LINE CONSTRUCTION - OUTSIDE CABLE SPLICER $10.04 $16.21 $21.11 $33.04 1E 6L $36.08 1B 5A $31.01 1B 5C $30.26 $36.78 $39.78 1R 5A 1R 5A 1E 6L 1B 6W 1B 6W 1S 5J 1 1B 6W 1B 6W 1 1B 6W 1B 6W 1 1B 6W 1B 6W $51.97 $19.29 $25.53 $46.59 $19.64 $19.29 $19.44 $22.24 $19.29 $19.29 $22.21 $19.29 $19.29 $20.58 $9.27 $36.08 1B 5A $10.31 1B 50 $55.64 1X 5C $13.23 $9.35 $11.40 $13.40 $32.34 1E 5A $30.66 2B 5A Page 8 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** Classification HOLE DIGGER/GROUND PERSON INSTALLER (REPAIRER) JOURNEY LEVEL TELEPHONE L1NEPERSON SPECIAL APPARATUS INSTALLER I SPECIAL APPARATUS INSTALLER II TELEPHONE EQUIPMENT OPERATOR (HEAVY) TELEPHONE EQUIPMENT OPERATOR (LIGHT) TELEVISION GROUND PERSON TELEVISION L1NEPERSON/lNSTALLER TELEVISION SYSTEM TECHNICIAN TELEVISION TECHNICIAN TREE TRIMMER TERRAZZO WORKERS & TILE SETTERS JOURNEY LEVEL TILE, MARBLE & TERRAZZO FINISHERS FINISHER TRAFFIC CONTROL STRIPERS JOURNEY LEVEL TRUCK DRIVERS ASPHALT MIX (TO 16 YARDS) ASPHALT MIX (OVER 16 YARDS) DUMP TRUCK DUMP TRUCK & TRAILER OTHER TRUCKS TRANSIT MIXER WELL DRILLERS & IRRIGATION PUMP INSTALLERS IRRIGATION PUMP INSTALLER OILER WELL DRILLER PREVAILING WAGE $17.19 $29.41 $28.53 $30.66 $30.05 $30.66 $28.53 $16.31 $21.68 $35.78 $23.19 $28.53 $41.96 $12.00 $36.40 $41.19 $41.90 $19.60 $19.60 $18.37 $20.79 $13.17 $14.08 $14.40 Page 9 (See Benefit Code Key) Over Time Holiday Note Code Code Code 28 5A 28 5A 28 5A 28 5A 28 5A 28 5A 28 5A 28 5A 28 5A 28 5A 28 5A 28 5A 1M 5A 1K 5A 1T 50 8L 1T 50 8L 1 1 1 1 APPENDIX B PAYMENT SCHEDULE PAYMENT SCHEDULE Project: City of Bremerton: CIPP lining 420 LF of 14" cast-iron pipe Date: September 2008 COST BREAKDOWN* Item Description Qty VIM Price 1 Pre-TV Mobilization 1 LS $900.00 2 Pre-TV 1 LS $160.00 3 CIPP mobilization 1 LS $3200.00 4 14" x 12 mm CIPP @ 420 LF $62,886.60 149.73/LF SUBTOTAL $67,146.60 SALES TAX @ 8.6% $5774.61 CONTRACT AMOUNT $72,891.21 *Original quotation attached City of BremertonlColumbia Pumping and Construction Payment Schedule RX Date/Time eS/15/2668 67:55 08115/2008 5eJ95477381 11:05 5095477381 P.002 PAGE 62/62 Columbia Pumping & Construction, Inc. Environmental Services Division 1005 S. Maitland Avenue - Pascol WA 99301 (509) 547-4841 (BOO) 510-1103 Fax (509) 547-7381 Augusi15,2008 To: City of Bremerton, WA Re: 14" Force MaIn Rehabilitation Attn: Bill Davis Bill: The Environmental Services Division of Columbia Pumping & Construdion, Inc:, is pleased to present the following proposal for your consideration. 3. CIPP mobilization 1 .!.!lM LS HR LS .Er.ipe ItemlDesc:riDtlon ~ 1. Pre-TV mobilization $ 900.00 $ 160.00 $ 3,200.00 2. Pre-1V 4. 14" x 12mm CIPP @ $149,73 per LF 420 LF $62,886.80 This design is based on the following design criteria: existing pipe is assumed in a partially deteriorated state, soil density of .120 Iblt, assumed pipe depth to invert of 4'~ 6', Assumed ground water at surface, 2% ovalily, H-20 loading, safely factor of 2.0, short term flexural modulus of the CIPP material Is 250,000 psi, operating pressure of 90 psi and surge pressure of 45 pst Any change In destgn thIckness will result in sn appropriate modlllcation in price. NOle: Taxes and bonding are not Included, You must provide water for cleaning and processing of linerS alllo charge. You must supply a reasonably secure lay-down area at no charge. You must supply, at no charge, all treffle control, other Ihan sIgns and cones. You must provide, at no charge. an approved dumpsite for material removed in the cleaning process. We are planning on using a 12mm liner and vinylaster resin for tills project. The vlnyle!lter resin is more flexible than polyester. Themfore, it should prove to be beller for B pressure pIpe, We suggest Ihal you independenUy confirm our liner wall thickness prior to confirming ihls agreement. YOU must supply all vehicle access to pipe ends for the lining operation. All excavation. backfill, removal and replacement of access spools by others. Post"linlng video inspection Is included. Anything not Inc:1uded Is excluded. If Columbie Is unable 10 per10rm scheduled work dUB to no fault of ColumbIa, a $575.00 per hour stsndby charge will be Bssessed. Thank you for your interest In our products and services, We look forward to working with you in the future. Columbia Pumping & Construction, Inc. Environmental Services Division F~~ Project Coordinator Approved By: Date; WA CONSTR ID #COLUMPC162K1 AK CONSTR to #290769 OR CCB #138184 APPENDIX C SITE LAYOUT AND FORCE MAIN CHARACTERISTICS > o C) ::i o ~ z <( Z Z I- ~ C ...J W u:: W Zoo 1-0 z- _0 cr:2 WI""- zZ -0 :!!:z 0::0 w_ 1-1- ~~ cO zQ. <(0:: cO wO fnfn fn...J :::)w O:::E: fnO is:!!: ~~ DATE: 7/30/08 '-1 I J I J~ ." ~ \ , ~~ ~, -. / ,~.., ;".., ~ N.'. #" ,. ,,: oS , f~~~~;!~;-::-~;~~r=:~;:tp "'::.':~~3'~~:;;~~~] -,-;--......-_.._~00PP..OO<.,.......... ~ c.- ~>O.......... ..~ "', 1.';O_'._"'''_~'t.o.... ..".._.... .....,......... . - "";._..c. ': ""j' . ' ',I ...,- ---::-~ -.,-/..., X~-'#: -#" .~. -". 4',.;' - __'--"':;_ '.' ,__..J,'...._ .~_':_:;;.;__._~::-".~.1>0:$.. ~-=~.~"-:;.....c...",.-:r1"~'lI!O';:..... . ....~~-: ~;--:~~:4:~~.t~/~':~>,:;~ :,.:~t~li>~~.~.~;~,. ~..~ A''; City of Bremerton Scope: Install CIPP in 420 LF of 14" cast iron sewer force main FORCE MAIN CHARACTERISTICS Parameter Value Size and Material 14" Cast Iron Dated installed 1965 Standard Operating Pressure 92 psi Maximum Operating Pressure (surge 140 psi condition) Maximum vacuum pressure Unknown - Several air vacuum valves are located along the 3500 LF force main. Total length for CIPP 420 LF Bends 2 @ 22-1/2 degree, No mitered bends, all standard cast iron fittings Cover Appproximately 4-6' feet Comments Pipe is flat with no vertical bends Updated: July 30,2008