HomeMy WebLinkAbout4748
Contract Number:
Vendor:
Subject:
Department:
File Class:
Begin Date:
End Date:
Review Date:
Vault Date:
Comments:
4748
PEASE & SONS INC
OB-1 Pump Station & Force Main Repair
Engineering
LEG 12-1
08/18/2008
09/30/2008
02/15/2011
01/01/2011
Change Order #1-2/09
Washington State
,,",'.,' : 'i Department of Revenue
PO Box 47474
Olympia, WA 98504-7474
278040964
Certificate of Payment of State Excise
Taxes by Public Works Contractor
PEASE & SONS INC
PO BOX 44100
TACOMA WA 98444 0100
CITY OF BREMER TON PUBLIC WORKS
BILL DAVIS
3027 OLYMPUS DR
__~._____________~___________________________________.____~___ ~ _ __m___ ___ __ __ ~_____ ____ _ ______________ ,_____________ __
BREMERTON WA 98310 4799
"
We hereby certify that taxes, increases and pynalties due or to become due frol11 the above-named
contractor under Chapter 180, Laws of 1935, as'amended, with respect to the following public works
contract:
CITY OF BREMERTON PUBLIC WORKS
5075 & 5083, SEWAGE PUMP STA OB
together with all other taxes, increases and penalties duefrom such contractor, have been paid in full or that
they are, in the Department's opinion, readily collectible without, recourse to the state's lien on the retained
percentage.
This certificate is issued pursuant to the provision of Chapter 60.28 Revised Code of Washington for the
sole purpose of informing the state, county, or municipal officer charged with the duty of disbursing or
authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases
the state's lien on the retained percentage provided by this Chapter for excise taxes due from said contractor.
This certificate does not release said contractor from liability for additional tax that may be later
determined to be due with respect to the above-mentioned contract or other activities.
Dated 5. J..f -crt
at Olympia, Washington,
State of Washington
Department of Revenue
Jc1'fV) . L--~ D .
Certifying Officer ". '.
For tax assistance, visit dor.wa.gov or call 1-800-647-7706. To inquire about the availability of this document in an alternate format for the visually impaired,
please call (360) 705-6715. Teletype (TTY) users may call 1-800-451-7985.
'.
REV 310028 (10-01-02)
ACCEPTANCE OF COMPENSATION & RELEASE OF ALL CLAIMS
City of Bremerton - Sewage Pump Station OB-l and Force Main Repair
City Project #5075/5083
Notice to Proceed date:
Substantial Completion date:
Final Completion date:
August 18, 2008
October 14,2008
October 21,2008
Pease & Sons, Inc hereby indicates agreement with, and acceptance of, the final Contract
Payment of $160,309.75, total retainage of $12,736.96, the total Contract Price of
$276,646.71, including Washington State sales and/or use taxes, and the final Contract
Time of 64 calendar days, as full and final compensation for all Wark performed in
connection with Contract Numbers 5075 and 5083, and does hereby release the City of
Bremerton from all claims, liability, demands, damages and actions of any kind ~
whatsoever, arising from performance of that Contract. "'T"'~ iIoS'l..~A.~\i;i" ..~ "",,,,,~~t.
::'e;1Z?-
vt
Date:
~ / tf'ItJ 9
Title: I!,'(['L 1'Jr-:eJ.i~i ytv.C-f-
Certificate of Notarv
Subscribed and s\<yom to befote me this ~ day of ~'.1
~e_w~
,20_0 '1.
NOTARIZE HERE
,i ~
545 5th Street. P.O. Box 259
Bremerton, Washington 98337
(360) 377-3711
1-888-377-3711
Fed.I.D. # 31-1260530
tLUNG'.PERfOD->1:. J';"~~
,'C.'> 'C'\VADVERTISE Ct:IENT. AME',>,';~"'" .-,
21.;;'., ..GWRRENl"NEliAMOUNTD E;.
\DVERTISING INVOICE and STATEMENT
I'.,' c, PAGE#.;" '''5 'c' >.;.>< '1BllftING';DATE'.<;;,:ri:<;' 8 '",,"~1;,~:,~~~:""J~,>;, ,{,~, ;"~~:,.',I~;f\;:,.\;'.~!J~ Blt&EU.>ACCOtJN:r\NAMc:AND:AOOR,ESS.~0i;)>;~t>t>:; ;X~,';~~"-y, "~::;;'.f\,~:,;;\t 9 ;,[,;.;.., '," ..2,':...;",;;.;".;c~;~-;,>" 'REMI'TTANCEADORgSS;"'~.. Go:' ;., .;' . "'.:.2"...
1 04/12/09 CITY OF BREMERTON DEPT OF PUBLIC KITSAP SUN
..., . "" '. :'BILt:ED.AGC0UNT NUMBEFl '-~.i,:, '':';'''' ~,~ CITY OF BREMERTON DEPT OF PUBLIC PO BOX 34688
3027 OLYMPUS DR SEATTLE, WA 98124-1688
15554 BREMERTON WA . 98310
. ,-: :';,;,' .;ADVERTISERlCUENT.NUMBER ..: . . @
Project # 5tJ 8.3
'0
Initials
-
Date Ok'd
"
020054509700000066515
,,'
04/11 246634
04/11
NOTICE OF COMPLETION
3310 20085287
BILL DAVIS
2x14
2
66.51
iii Kits~~~8un
__.__.._n_.~~ 'kits~ps'-;;';~~
. ','~ ,< \ :~JNVOICENUMBER < ';',,'1
545 5th Street. P.O. Box 259
Bremerton, Washington 98337
(360) 377-3711
1-888-377-3711
Fed. 1.0. # 31-1260530
66.51
All accounts are due upon receipt.
ALL MAJOR CREDIT CARDS ACCEPTED
545097 04/10/09 - 04/12/09
BilLING INQUIRIES: (360) 792-3333
.\..,.
.-:
-~
;.
AFFIDAVIT OF PUBLICATION
Account # 15554 AD# 246634
STATE OF WASHINGTON
COUNTY OF KITSAP
I, Laura Wessels, being first duly sworn on oath, deposes and says: That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of
KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an office maintained in the aforesaid
place of publication of said newspaper; that the following is a true text of a legal advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following date, to wit:
April 11, 2009 that such newspaper was regularly distributed to its subscribers during all of said period.
That the full amount of the fee charged for the foregoing publication is the sum of $66.51. The amount has
not been paid in full.
L:-<AaAj~
(Signature ofprincipal Clerk)
Subscribed and sworn to before me this day of April 28, 2009.
~",""III"",,1.
~,,'I/ ) ~ s~ 1//1,
, ..........,.~ ~+&
~# ....~..IID;:...~"'t,
I .O~ 1~'~\
.: ~rt.,... 1 .
....... r a
. . ?)
i.~\~ ZIe I
,c-:.!t l
't...~.~!..~
If,,tA'HtIl'1 ~
l"'"IIUtl""''''
~
1,1}/YlAA,
Notary Public in and for the State of Washington, Kitsap County. 1
NOTICE OF COMPLETION
Notice of Completion has been issued by the City of Bremerton to Pease & Sons, Inc. for the contract
Sewage Pump Station OB-1 and Force Main Repair. Any parties having a claim for material, labor or
damages related to this Contract have forty-five (45) days from the date of first publication of this notice to
file a claim.
Carol Etgen
City Clerk
345 6th Street
Bremerton, Washington 98337
April 11, 2009.............................AD #20085287
--
~
Emp~(I)'yrlr1e!i'wt Security Department
WASHihlGTON ST/\TE
CONTRACTOR: PEASE & SONS INC
PO BOX 44100
TACOMA, W A 98444
) CERTIFiCATE OF
) PA YIVIENT OF CONTRIBUTIONS
) PENALTms AND INTEREST ON
) PUBLIC WORKS CONTRACT
ES Ft€J~,rence No. 251924-004
TO: CITY OF BREMIERTON - BILL DA VIS
3027 OLYMPUS OR
BREMERTON, WA 98310
The Employm~ltt ::~('c!lr~ry !)er~f.tm(~llt herehy ep.rtifies those contributillns, penalties and interest due
from the above named contmctor under ~he IE,mployment Security Ad have been paid in full or provided for
with respect to the follm,'ing public works contract:
5075 & 5083
The Employment Security Department hereby certifies that it has no claim pursuant to RCW
50.24.130 against the puhlic bL'dy lI<<IE'WJ above for tax attributable to si2rvke performed for said public body
by the above named contLlctor r:,n Hit: above described contract Th~ Employment Security Department
releases its lien on the rclaiiled perct:Bl",,;;e., which is provided by ReW 60.2~UUO for contributions, penalties
and interest due from said contractor.
This certificate does not rdell:';,t,;. ~aid wntracwi' from liability for additional contributions, penalties
and interest which may be later determined to be due with respect to the above mentioned contract.
Dated at OlympLl, Wash:ngt:JfI on April 21,2009.
COMMISSNONER
OYlVHENT SECURITY DEPARTM T
!It
Original-Disbursing Officer
Duplicate-Employer
Triplicate-Central Office Files
RECEIVED
MAY 062009
EMS 8449 760 R3-98
\ENG\NEERING DIVISION
\ -.-.-.
Verify Workers' Comp Premium Status - Employer Liability Certificate
https://fortress.wa.gov/1ni/crpsi/AcctInfoPrint.aspx? AccountId= 12041...
Washington State Department of
Labor and Industries
Employer Liability
Certificate
Department of Labor and Industries
Employer Liability Certificate
Date: 04/08/2009
UBI #: 278 040 964
Legal Business Name: PEASE & SONS INC
Account #: 120,413-00
'Doing Business As' Name: PEASE & SONS INC
Estimated Workers Reported: Quarter 4 of Year 2008 "51 to 75 Workers"
(See Description Below)
Workers' Comp Premium Status: Account is current. Firm has voluntarily reported and
paid their premiums.
Licensed Contractor? Yes
License: PEASES*302PO
Expire Date: 9/1/2010
Account Representative: TW / COLLEEN NELSON (360)902-4715 - Email:
NELS235@lni.wa.gov
What does "Estimated Workers Reported" mean?
Estimated workers reported represents the number of full time position requiring at least 480
hours of work per calendar quarter. A single 480 hour position may be filled by one person, or
several part time workers.
Industrial Insurance Information
Employers report and pay premiums each quarter based on hours of employee work already
performed, and are liable for premiums found later to be due. Industrial insurance accounts have
no policy periods, cancellation dates, limitations of coverage or waiver of subrogation (See RCW
51.12.050 and 51.16.190).
10f!
4/8/200910:47 AM
CITY OF BREMERTON
CHANGE ORDER
CONTRACT CHANGE ORDER NO: 1
PROJECT NAME: 08-1 Pump Station and Force Main Repair
PROJECT NO:
5075
CONTRACTOR: Pease and Sons
ORIGINAL CONTRACT AMOUNT:
PREVIOUSLY APPROVED CHANGES:
100,000.00 DAYS:
0.00 DAYS:
N/A
N/A
THIS CHANGE:
176,646.70 DAYS:
N/A
REVISED CONTRACT AMOUNT:
276,646. 70 DAYS:
N/A
This Change Order covers changes to the subject contract as described herein. The Contractor shall
construct, furnish equipment and materials, and perform all work as necessary or required to
complete the Change Order Items. The increase or decrease in contract price shown below includes
any applicable taxes.
0 ...... INCREASE IN (DECREASE) IN CONTRACT
I'- I'-
...... ...... DESCRIPTION OF CHANGES CONTRACT CONTRACT TIME
Q) Q) AMOUNT AMOUNT EXTENSION
:i :i
c::: c::: ($) ($) (DAYS:)
x This was an emergency project that required considerable $176,646.70 N/A
coordination amongst several contractors. Additional costs
were involved with bypass pumping, sliplining force main under
Kitsap Way, and excavating on slope on north side of Kitsap
Way.
Four (4) Work Change Directives are attached along with
spreadsheet showing work hours, equipment and material costs.
$176,646.70 (0.00) N/A
Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims
of any kind or nature arising from or connected with any work either covered or affected by this
Change Order, including, without limitation, claims related to contract time, on-site or home office
overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for
past performance.
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the
contract price specified for each item, including any and all supervision costs and other miscellaneous
costs relating to the change in work, and as to the extension of time allowed, if any, for completion of
the entire work due to said Change Order.
CONTRACT CHANGE ORDER NO: 1
PROJECT NAME: 08-1 Pump Station and Force Main Repair
This document will become a supplement of the contract and all provisions will apply hereto. It is
understood that this Change Order shall be effective when approved by the City of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a change order
that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform
the surety of this change, and shall take appropriate action to modify any bonds required under the
contract to address this change.
RECOMMENDED:
RECOMMENDED: X ;1~-~ t!. ;Jt~
CITY ENGIN ER JDIRECTOR OF PUBLIC WORKS
2 / ~/(;?'!
/ / Date
ACCEPTED:
~~-
\Jf
1jzJ cYf
Date
APPROVED:
Date
ATTEST:
~
City Cler
Page 2 of2
CITY OF BREMERTON
WO~K CHANGE DIRECTIVE (WCD)
weD #: .-1 Date: 9/16/08
Sewage Pump Station CW-1
Upgrade
Project #: 5075
Contractor: Pease and Sons
Notice to Proceed Date: Aug 18, 2008
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S):
Modify 08-1 interior piping as shown on the attached drawing and as directed by City
staff.
ATTACHMENT(S): Outside force main piping plan
If a claim Is made thet the above change(s) have affected Contract Price or Contract Times any claim for a Change Order
Is based thereon will involve one or more of the followIng methods of determinIng the effect of the change(s}. The
Change Order will be executed In accordance with Section 1-04.4 of the WSDOT Standard Speolflcatlons, or Article 10 of
the General CondItions.
Method of determining change in Contract Price:
Method of determining change In Contract Times:
o Contractor's Records
o Engineer's Records
0 Unit Price
0 Lump Sum
~ Time & Materials
0 Other:
o
Other:
Letter from pump manufacturer
Estimated Increase (decrease) In Contraot Price:
Estimated Increase (decrease) In Contract Times:
TBD
SubstantIal Completion:
o
days;
$
If the ohange Involves an Increase, the estimated
amount Is not to be exceeded without further
authorization.
-."...---\
R~~MEND~D.
( /
\.~~'
Ready for flnel payment: 0 days;
If the change involves an Increase, the estimated tImes
are not to be exceeded without further authorizatIon.
By:
By:
t4
AUTHORIZED:
.I
i -S--D rr
Ww.L ;Ur6r~/:" ip OJ
08-1 Pump Stalion fimllll1Sncy Repair
PAGE: 1 OF 1
Z"- ~ =
SCALE:
1 "= 4-0'
08-1
WET WEll
40
~ r)
~) r;4.)
\ I /'>!-">
ifl
I
I
VERTICAL LADDER
TO MEZZANINE
(2)-~,
.-, '--=-~ '-
(Ih"-,
,_/ "'I'r' - VA1'{L
(~)-, , - -,- ROOM
(Sr- '- I ' 0
"m
@~L\
\.,-:;-j
~I
:=J:::;;
!Lo
~::iO~
'--... ~
---
"-
c=_~=-=-=~-
-Q--------
MATERIAL LIST
OJA DESCRIPTION COMMENTS
ITEM # QTY
I 3 8 90' Base Bend (FL) 150 lb.
2 3 8 Swing Cbeck Valve (FL) Outside weight & lever.
3 3 8 Knife Gate (FL) Trueline, Bi-diroc, RS, 316 SS body,
4 3 8 Tee (MJ)
5 3 8 12" Long Spool (FL x PEl
6 I 8 Plu' (MJ)
7 I 8 Spool 18', Cut 10 Length (PE)
8 5 8 Solid Sleeve Sbort (MJ)
9 6 8 8' Spool (FL x PEl
10 I 8 Spool I' lengtll (FL)
11 I 8 Gate Valve (MJ)
12 I 8 Gate Valve (FL)
13 I 8 Tee (FL)
14 I 8 90' Bend (MJ)
15 I 8 Bliod Flnnge (FL)
16 I 8x 12 Reducer (FL)
17 I 12 , Spool I' Lengtll (FL x PEl
18 I 12 45' Bend (MJ)
19 4 12 Ductile Iron Pipe J 8' Lengtlls (Mechanical Joint)
20 2 12 Solid Sleeve (MJ)
21 I 12 Spool I' (FL x PEl
22 I 12" 14 Reducer (fL)
23 I 14 45'Bcnd (FL)
24 I 14 Adnpter (FL x MI) Re-use existing Blind Flange.
25 I 12 Gasket & Bolt.
<I 12 22 I/Z'Bend (MJ) ("i;xtra fittings
:-IOTE: All fitting. (except vnlyos) and pipe n"'-4ll!!'role,c.to,L~l~:___ --
-*AlIPij;e- ~1~o~~ld-b-;CI~~~.5-j ?llCli"l~ 11:~n. . u_
CITY OF BREMERTON
WORK CHANGE DIRECTIVE (WeD)
Sewage Pump Station CW~1
Upgrade
weD#:
2
Date:
9/16/08
Project #: 5075
Contractor: Pease and Sons
Notice to Proceed Date: Aug 18, 2008
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S):
Rehabilitate approximately 500 LF of 14" cast iron force main using slipline and
open-cut trenching in accordance with the attached plan. Confirm all pipe lengths
prior to material purchase.
ATTACHMENT(S):
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order
is based thereon will involve one or more of the following methods of determining the effect of the change(s). The
Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of
the General Conditions.
Method of determining change in Contract Price:
Method of determining change in Contract Times:
D Contractor's Records
D Engineer's Records
D Unit Price
D Lump Sum
~ Time & Materials
D Other:
D
Other:
Letter from pump manufacturer
Estimated increase (decrease) in Contract Price:
Estimated Increase (decrease) in Contract Times:
$
TBD
Substantial Completion:
o
days;
If the change involves an increase, the estimated
amount is not to be exceeded without further
authorization.
Ready for final payment: 0 days;
If the change involves an increase. the estimated times
are not to be exceeded without further authorization.
By:
AUTH00M IlG
/j f-1l, .. ., .~
CITY 07REMERTON
\-/ tJ I ',;,.~ ;; f'
1j (ft.; () r.:;
By:
RECOMMEND;D: J
~~ p~ P.e;;Pr!- <~ ~,S ~,
CONTRACTOR
SEWAGE PUMP STATION CW-1 UPGRADE
PAGE 1 OF 1
NOTES:
~NTRACTOR SHALL SUPUNE AND REPLACE THE EXISTING 14" CAST IRON FORCE MAIN AS INDICATED ON THIS SHEET. NEW PIPE AND FITTINGS SHALL BE 12" DtA HOPE (SDR 11, OD _ 12.75,
FLANGED), UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL PROCURE MATERIALS, CONTRACT PIPE WELDING SERVICES, AND INSTAll HOPE PIPE AND FITTfINGS. CONTRACTOR SHAll PROVIDE
TRAFFIC CONTROL FOR WORK IN THE RIGHT-OF-WAY. P<c/"yUl?mMI'Jt FoAH
2. FOR SlIPlINING, FORCE MAIN INTERIOR SHAll BE CLEANED ONLY IF NECESSARY. PLACE FI:6WJ!;BtE GROUT AT PIPE ENDS TO SEAL ENDS AND MINIMIZE PIPE MOVEMENT. INSTAll GROUT 5 TO
10' WITHIN PIPE.
3. EXPOSE AND REMOVE 22-1/2' AND 45' BENDS, AND SPOOL AT BASE OF SLOPE BEFORE SlIPUNING. CONFIRM THAT SECTION 4 CAN BE SUPUNED FROM WITHIN SHOULDER OF KITSAP WAY.
4. DEMOLISH PORTION OF THRUST BLOCK TO EXPOSE AND REMOVE 45' BEND. CUT OUT EX. 14" PIPE IN ORDER TO FACILITATE SUPLINING. INSTALL NEW 45' BEND AFTER SUPlINING. RESTRAIN
TO EX. BLOCK BY DRILLING AND INSTALLING FOUR (4) t' THREADED RODS. FORM AND POUR CONCRETE BLOCK OVER BEND AND EX. BLOCK.
5. AT BASE OF SLOPE, RESTRAIN NEW 90 BEND TO EXISTING THRUST BLOCK. DRILL AND INSTALL TWO EXPOXY ANCHORS (i" THREADED ROD) AND POUR CONCRffi BETWEEN NEW BEND AND EX.
THRUST BLOCK. REMOVE MISC. CONCRETE BLOCKS AND FILL TO LAY PIPE FROM NEW BEND TO PUMP STATION.
6. ':1~E UP REMAINING PIPE FROM THE 90 . BEND TO THE PUMP STATION USING HOPE PIPE AND FITTINGS. THE CONTRACTOR SHAll FIELD DETERMINE PIPE LENGTH AND REQUIRED FITTINGS,
..~~lqllh:"",,"
l~\ "t.i.~ilf;:'"
l~! ~-' \~~
\ .,.1j;. J NO.
\~~..t." I .
......:;;.' I
t=-urnson..11IC1
'"
....
t1>
..
~
I"l
...
ill
p.,
~
(,)
REVISIONS
""""""'"
.- ~ _-vi
SOlO
~Et1l0N J
OYSTER SAY
AVE. N
KITSAP WAY
! "lOP or SUlPE
ElIKE: w4E; S10twAU'l
I SmlOfl ~ I
SEcnou 1 (REPLACE PiPE, U!;:E
ItS .JIICKING: "IT)
PIl'ELINE ImllAUILATION SCHEDULE
S.<llon Es~ R.h.blnt.lIon From To Comm""t
L.nglh M.lhod
(field
tonnnu
100 Sliplin, a 22-112 CUI I:ndufpipc in lnsLilU fiUing5 10 mllkc conneclions 45 indicated IlD
beud former ClPP pil plan.
'oulh
50 O",,"CUI Ex 22-1/2 Ex 22.]/2 bend Replnee both Z!-J/2 b.nd. with HDPE 22.1/2 bends
beod flanned. Useexctlv!J.ticn rorsli line "ndcin it
300 Sliplin.c Ex 22-1/2 Ex 45 d.g bend i. Expo,e .ad "'mOVe bolh 22.1/2 nnd 45 degr..
deg bend Ibrust block bl:nds befcre :sJiplining
north
60 Slipline Ex. 45 deg &.~ 90 b~nd I1t bottom ~o'c p.nd n:n~ove 45 bend in thrust blCJ<::k lI.od
bend in c( slope. rtear pump SpoOl.a1 bniciJf~lDpc bl:fore dipIinmg. TIlb b a
Ihnat block $tl1tion ~L=eJl Iropt:. Confirm thnl.sliplining elm be stl1ced
and done from lihoulder DrKilsa W:J .
bAtt BY
r
r--"""'\
w.o~IU...th.U.G:,l.U[
FIIOTSCALtAttXJ1ll1Gl.'I
.... ."'"
CITY OF BREMERTON
DEPARTMENT OF PUBLIC WORKS & UTILmES
ENGINEERING DIVISION
JT
j~ H/A
SCALE
~Em.H/"
CUICH 1'1'.; w.o
liI;t.$H. p,t. f.Hi'PI ~l.\,lt'M
a'tO(ID .~ lIl1'
w,wL "L , .lD1.r.1 !loAn:: 1,10.1
tlfr.,I.llIn~ Ir',[l
0A1t IflM
MA-T8!-IPrW
bf.JD t-F /f'bP";; 5ZJIZI!
IPS.
. r 9< 2. Z 1(1- tv..~
2 X <I s~ b-e.r1J
1 )< <j 0 Ia-e""o
. 12. +' /ttJjM
LvNFlli!('ol '....teT-1-/-cD i
() I=- t..;..tJ STeu c:ncfl..]
.0..... sT^lD'~
w~ '"
RDN1W^Y
CJ
:DPE NlD BmDS ml/
SEE 1I00E G.
11011 I
OB,1 FORCE MAIN REPAIR
SLlPLlNE AND TRENCHING ELEVATION
SCHEMATIC AND NOTES
CI4:fl
G1 ~
<
1
"'
.
CITY OF BREMERTON
WORK CHANGE DIRECTIVE (WCD)
weD #: 3 Date: 9/16/08
Sewage Pump Station-evprOR-j
q' ff;v~ Hcun UpgfaEie- IkpB...lf
Project #: 5075
Contractor: Pease and Sons
Notice to Proceed Date: Aug 18, 2008
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOllOWING CHANGE(S):
Install ceiling pipe hanger flange, adjustable clevis hangers for 8" ductile iron pipe,
and 1/2-inch 304 58 threaded rod in order to provide vertical support of pipe
manifold at 5 locations. Reuse existing ceiling pipe hanger flanges if available.
Threaded rod or clevis hanger shall be new products.
Use Megalug or equal to restrain all mechanical joints connections. Threaded rod
between joints is NOT required for additional restraint, unless otherwise noted.
ATTACHMENT(S): Plan showing location of hangers; detail of ceiling flange, detail of clevis hanger
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order
is based thereon will Involve one or more of the following methods of determining the effect of the change(s). The
Change Order will be executed In accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of
the General Conditions.
Method of determining change in Contract Price:
Method of determining change In Contract Times:
D Contractors Records
D Engineer's Records
D Unit price
D Lump Sum
f8] Time & Materials
D Other:
D
Other:
Letter from pump manufacturer
Estimated increase (decrease) In Contract Price:
Estimated increase (decrease) in Contract Times:
$
TBD
Substantial Completion:
o
days;
If the change involves an Increase, the estimated
amount is not to be exceeded without further
authorization.
Ready for final payment 0 days;
If the change Involves an Increase, the estimated times
are not to be exceeded without further authorization.
AL1THORIZEP,/ . ~ '
h1ll< 1/1r
CITY OF BREMERTON
By:
08-1 Pump Stetion Emergency Repair
PAGE 10F4
]:ns~ alliJ tip-€.. htl-Yl 5 ex-
-fIClh~ {: c.S2mis ~"-~. Sse.- ~
~voilid- &..d-zU I s ~ 1/2... 3o/{ ss -j+.~
s- \ I Yb~ ,."
(Pi. /<0 CA--1I'6YtS ) s~
VALVE
ROm;:r
SCALE:
1 .. = -4a"""
sn'
~t
:J:a
0..0
~o
01:1:
If .
~
:z~
08-1
WET WELL
~ ;0,e
\'/
-m
I
It (9)
,~
I
I
I
~ l--@)
~
/
I
..
VERTICAL LADDER /
TO MEZZANI~.IE.....
\
..
"
\.30lC.30 ACCESS
!-IATCH
Anvil Co:mpany
Iofl
http://www.anvilintl.comlps_ hnnger/index.pbp?CAT=3&FIG=590&...
~~\~IL:
~.....~~:~
Products &: Services
': _ __ ,-' - . ,~:- HI-l,;l~; - :~\~.;ili~~:71' . ::tITil'-fl 'r f.l :;;-:-l.ljl,l. .1..~ .'~ .~~{,~,;~.tl ri-ll:' :\ji~Jr.:~I~I; ~. 6~~~-l-~~1j-Li4~~.
..-----.--.--.---. -I
PlaN.. L_____J FInd
Fl9Unl: 590 Adjl1lltoblll CIIlI/Is for DucUle or Csot Iran PIps
ISldrmltill nl,INIU r:dn'" tnl
Fig. 590
SIZll Ranlle: 4' UlfQuah 24' ducae 01 wt 1.0Il plpa
Malarial: en/bon &It~1
Flnllll: 0 1''f;1ll 011:1 Glll'alllzcd
Service: Retonlmended larllla sUlPWillllol dudija 1rlll1 or GISt 1rlll1 pipe.
.Approvalc Clllnpllas \1illl Feder-II Spadli:allUII A.A-! 1921\ (tYpal/
'JNl.N.JTI.E (/"ypcI1Bnd MS5-SP-&D IType 1/.
In&laUalloD: IbJIgUllld IIUl abm clll'liS must bc liabIDlllld Mi:llrellt 10 assUI!
pruperhanocr perltttnumtlL
Adlmmenl: Verlial udjur;tme!ll vdthoul remolllng pipe mar be JI1llde
',em 11~,'lIlloUDl1 m",'. varying I'lith Iheslzul UI8 clavls. Wuhlen upper
nut aller ad)Ullm!nL
Ordllrlng: Spetiryplpo Illl!, llgutlllllmbel. nama and "nlslL
Adjustable ClevIs for Ductile or Cast Iron PIpe
....~-...
:r'7:
Fle-illOl LaUdllllbs) -Walghl (Ibs)' DfmcnlllOrll (In)
I I Rod
D.IJC.L MIIX Laad W Ighl D.uc.l. SI:e I B I C I ElF
Pipe SIze a Pfpa o.D. A
I U30 I 1.G4 I 5 .,~j5lf.u I B'I.. i W, , I"
~-'I'''I
~ ! 1.940 1 us l~ 'I, 7V, 1 10'/1, ; 5"/1, !__
~--1~i 6.10 1~_I__~ 13)~I~_~.~~_L~
10 I, 3.6DD " 9.13 IIVl 10'" ! 15"111', 8'1J 1 2'/to
'11 . .
..--..!!---11....?~~.~~..-.L~:6~... ..._l~~?_._. [....-".J)!Y.!.~11.!~~-~L!n.~~~..L..~~.
14 ~.2DO i 10.04 U'I. I 13VI . 20'A I 11'1.. i PI"
III : 4.UO i 24.52 I I7lf. I ~122t"',. J..~I 2'''~
18 ! 4.800 12MB! 2D __..___~L 20'1. ! ISV" _I :
20 ! 4.80U f 46.24 I 22.... I hlev, ! U'/II 1 16111 ! 3"/11 I
2~ i 4.80a i S7.10 20;;;-- I'll 20v..! 33'1. 1 1D'II i
Anvllltllamilllona.) It!: n .tIllblillilDry iiI MttnllDr WOlaJ P.c:d\JtL!lii tm::.
~
C200D. AnvlU1l1ltlnallortal
Seerch
9/16/2008 2:48 PM
Anvil Company
10ft
@"'ANVll;
f yrm,......nNATta..."'*"
1 ..;g...~UonI n.KL=I
http://www.anvilintLcomlps _ hnnger/index.pbp?CAT~&FIG"" 153&...
PlllNo: r--.-."........ '''''''1 And
_~.._...__......_. I
:~~ '- ~ .... -- ~ _: ,<-;;'_ = -- : "I'!l1 - :.'h:ln; "i;"III~ -'j lj\r~III-_li:~- .~ ':='~\II-,.l '--- :;: ~\ l~l,r'~;;l-l'i:~,-\ ~ ;t~ i~l::l~': . L\;+-~i,~i.~,lr,I\.J
Pt.oducts & Set"vices
Figure: 153 Pipe Hanger Flange
ISlIbrnlSt.,1 Shoo" k!!!!!!.!!L
Fig, 153
Pipe Hanger Flange
SLzB Range: W UuuuOh ;-4"
Malerlel: MiI~bla bon
F1nlsll: C P'31n
SBrvles: R=imml!lldad lor 51lSpall31cm III plpo Ul1el1 or coIXMIllOJn
J.MI CeirlllQ5.
Approvals: UL ute LlsladJlld FIA IIpplllVad.
InslallBllun: FlllnJlutu WbulI'lO holg. SI'I5 W. 5,1.', and J./>'
hne Ihlllo holes.
. Foalurs8:
· Plovldes wlllc:allllljullmcnl up 10 1",
. Gcod appr.mmco.
Ordarlng: spccily rod slm. nOu,e numballlld nDI1lIl.
Rad
Size A
Malt
Load
AIWH IntamzallaltlJ III A IUltI2.ldla:1i" af f.lU1lllpr WAi.r ProclUc!!I 1M.
li'SIe
~-~
\J
W. ~I'. -Yo' Silt
p ~~'----i
~"""r
I 1" ' '"
C,-'"
t'
_. .1:"-1
Sct8\!1 ClIClo
Dla.-F
2
~
C~UDtl.IlIMII.l."Ii1/lIlIa/
Search
9/16/20082:43 PM
CITY OF BREMERTON
WORK CHANGE DIRECTIVE (WCD)
Sewage Pump Station ew=4 D~-'\
t1 Hsv-U ~'vl~ tC.~'r
weD #:
4
Date: 9/29/08
Project #: 5075
Contractor: Pease and Sons
Notice to Proceed Date: Aug 18, 2008
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S):
Install and restrain a" and 12" ductile iron pipe immediately outside station as shown on
attached plan sheet.
ATTACHMENT(S): Outside force main piping plan
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order
is based thereon will involve one or more of the following methods of determining the effect of the change(s). The
Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications. or Article 10 of
the General Conditions.
Method of determining change in Contract Price:
Method of determining change in Contract Times:
o Contractor's Records
o Engineer's Records
D Unit Price
D Lump Sum
~ Time & Materials
D Other:
o
Other:
Letter from pump manufacturer
Estimated increase (decrease) in Contract Price:
Estimated increase (decrease) in Contract Times:
$
TBD
Substantial Completion:
o
days;
If the change involves an increase, the estimated
amount is not to be exceeded without further
authorization.
Ready for final payment: 0 days;
If the change involves an increase, the estimated times
are not to be exceeded without further authorization.
RECOMMENDED:
~~ ~
I CONTRACTOR
AUTHORIZED: 1/ ~
~ CITY OF BREMERTON
By:
By:
08-1 Pump Station Emergency Repair .
PAGE 1 OF4
NOTE: ALL PIPING/FITTINGS
SHOWN ARE 12R DIA. 01
MH FRAME AND SOLID LI
/ 3' W ll: 3' H x 1.5' TI-lICK
~ONCRETETHRUSTBLOCK
SEE NOTE A FOR RESTRAINT..
APPROX. 315 FEET FROM
GRADE TO CENTERLINE OF ELBOW
UNI.FLANGE AND BLIND FLANGE.
BOLT TOGETHER WITH T-BOLTS
o
PlACE "'104" AIJJU"'MU~
MH FRAME RISER SECTIONS
GROUND
LEVEL
TWO {21 t SS RODS FROM UNI-FlANGE
TO MJ ELL USE DUC-LUGS
SPOOL {PEl, CUT TO LENGTH
. TO BRING 6' ABOVE GRADE AS
SHOWN (APPROX. 4' LENGTH)
[II
@
@
Ls'-sO FROM FACE OF WALL
TO WYE FLANGE
---
BYPASS MH -
SECTION DETAIL
PIPING OUTSIDE OF STATION WALL - PLAN
08-1 PUMP STATION REPAIR - weD #4
; MATERIAL KEY AND NOTES
..:...~.I:.:.":::~:@~~I~~9Q.L(fI~'~~);'_c{jiJQ~~~~~1H;:~~~gg~T.g.F.tA~~~::~~.Q~5?;:FR9.~.:vy~t+~.':. '.::,'~:: :.:.'
~ 2 !8" SPOOL (FL), 12" LENGTH
~ .- ........3 ..... /a';-x'12,i-REbDcER -(FLy.-.....-.......-----.-.-...---- .........-....-..---.......-.....-.-........ ..-..... ...... ............... ......-.... ..
.._...._,...._._.....I~.._.....__._........". .,......" . .."__n . n .__.._ __ __,m.u_._...... _"__n',u ,.-..... ..........................__.,,_.... .."...._....."........."............ __............ ... __................. ... "...... .
: 4 ~ 12" WYE (FL)
!-.,......5.....-....i.12i'..GATE...V)i;[\TE"(FLy-...... -"""...---. ..--.--.-....... ...___._.__..._........._........... ""_"'.'.' ............ ..... . .... .............n .. . .
:...:..::.::~::=..::..i1?::~:~:Qq~.I~~:~(p.~~.15_QtJQ.:~~f9..~:.:~~~~:!tC..:..:.::===.=...:__~_~=_._...~ .___' .:,. ..:.:::.::.:.....:.:.:....=........ .
c........~..__..! .~?::..~..L.?~~.:_~~~.~Jry:I~J..~~.~_Q.~.I~.1!:: .f9.F=!_'!.~!3JJ9~.'=-~~.Q!!Q!'J_~,~..!9.~f-I~l).E:.... _....... ,.. '.
; 8. 112" HOPE (FL), FIELD DETERMINE REQUIRED FITIINGS AND PIPE LENGTHS ... . .'
_"m"..'_"~'.''''_M_._"_ ~~, J --. __ . .._................ ....._~........ ...,.". _~~__ ...,~,,~.,'" ,_ ,_.,~,_..__._. '..._.__'_._'_'''h__ _. ,.~..". .. "."..._ ... .~,~.. V"h_'_~'._,~_._ __.__ _.. ... _. _... _.._". 'V"'V"'~'" 'M_'V ,~..~ .
A i3' WIDE X 3' DEEP X 1.5' THICK THRUST BLOCK, POURED AROUND FLANGE:"ORILL AND'"
i EPOXY EMBED FOUR (4) #6 BENT REBAR INTO WALL, INTO THRUST BLOCK. WALL
l.. .lEMBEDMENT DEPTH "" 6".
L...........:~.:..::.::Ir~I8:__~9:~gFf~J.if~j~E~__~~9TIq~$.E~QJ.~.4M.~?~RA~~::.$EE.. [).E.f.AI~.:::.."......:.:.,::.:____.__........._ ,...' ..'
9/29/08
WJD
CITY OF BREMERTON
SEWAGE PUMP STATION OB-1 AND FORCE MAIN REPAIR
FINAL COST SUMMARY SHEET
Contractor:
Notice to Proceed Date:
Substantial Completion Date:
Pease and Sons
August 18,2008
October 14,2008
Date: 11/3/08
Revised 1/27/09
Prepared by WJD, City of Bremerton
""'E::&'!iO~~'
..~ ' . ,,,,~Q{f~T:
..- .
."'3'<-'7 "'.'./.j""",~,,P~'i.-"""; ,"-0;:',"'"';-,,- 7 '+TZU T
Labor
Rental and Materials
Equipment
PEASE TOTAL
$49,440.65
$21,743.92
$10,139.47
$81,324.04
-~~;rc~"~TTT.:;..:.~~.:~:' ~:~~~\":~ .4.
Labor
Equipment
Materials
Rental Equipment
SUBTOTAL
MARKUP
QUIGG TOTAL
$17,573.19
$11,536.78
$8,524.47
$30,827.02
$68,461.47
$7,346.15
$75,807.62
'uiiiitFmtQ .
.n c" _. T'~' . . ;,..
. ~-"-,,-..,-"'t~-;c
Labor
Equipment
Materials
SUBTOTAL
MARKUP
C.A. GOODMAN TOTAL
$22,679.92
$15,529.30
$2,514.38
$40,723.60
$4,572.36
$45,295.95
SERVICE COMPANY
SDNSB:-rr l'k'"''\l~~ii'
SUBTOTAL SUNBEL T BASED ON INVOICE
MARKUP AT 21%
SUNBEL T TOTAL
$43,232.67
$9,078.86
$52,311.53
SUB GRAND TOTAL (W/O SALES TAX)
SALES TAX @ 8.6%
GRAND TOTAL DUE
$254,739.14
$21,907.57
$276,646.70
CITY OF BREMERTON wjd
SEWAGE PUMP STATION OB-1 PUMP STATION AND FORCE MAIN REPAIR 1/29/2009
WAGE RATES SHEET
Base ST OT
Name Labor Position Wane Loaded Wage Loaded Wage
Pease and Sons
Larry Boyd Project Super $65.89 $85.00
Ray Parks Project Superintendent $63.31 $81.67
Brian Smith Carpenter Foreman $61 .43 $79.24 $109.45
Justin Rustler Carpenter Apprentice $56.05 $57.27
Scott Grout Laborer $50.45 $65.08 $90.22
Mark/Coordinate Trucking $40.00
Armondo (Laborer) $40.00
Pease Pipinn
Kirk Parnham Plumber Supervisor $93.79
Terryl Burton Plumber Foreman $90.85 $124.63
Mike Biles Plumber $82.04 $111.41
Jeff O'Brien Plumber $82.04 $111.41
Shea Budlong Plumber $65.01
Jeff Frazier Plumber Apprentice $65.01
Jeff Emmett Plumber Foreman $87.91 $120.22
Edward Bass Plumber Apprentice $68.40
Quinn Brothers
Hans Breivik General Foreman $53.14 $68.55 $93.40
Alice Carlson TCS $37.69 $48.62 $63.25
Alice Carlson Flagger $36.56 $47.16 $61.06
Ashley Beaty Flagger $36.56 $47.16 $61.06
Sherri Davignon Flagger $36.56 $47.16 $61.06
Brad Taylor Truck Driver $24.25 $31.28 $45.68
Brad Taylor Laborer $41.37 $53.37 $70.37
George Middleton Laborer (Teamster) $19.61 $25.30 $0.00
Ron Stiles Laborer (Teamster) $19.61 $25.30 $0.00
C.A. Goodman
Herb Anderson Foreman $53.82 $69.43 $95.71
Cecil Goodman Foreman $53.82 $69.43 $95.71
Damon Bush Operator $52.69 $67.97 $93.50
Chris Bunker Operator $42.82 $55.24 $0.00
CITY OF BREMERTON v.jd I I
SEWAGE PUMP STATION OB-1 PUMP STATION AND FORCE MAIN REPAIR 1/29/2009 I I
r~ '.i..-#;i, ~ <~ Ttt} J.~ wi T" I 'hi ,; I I .I I, I", I T' I, H; :
, T l M " ';T,- W Th M T W Th F T Th M .W Th F M;. \\'" F:M T W Th F "M ., M1
<',"-'",
II If 11 II II II II II! II II' ~I ;11 I If I II ~ II' ~ II II II II II: II III RT Hours per Loaded
: I daily time Wage Rate
LABOR {Pease\ S I sheets RT TOTAL
Larry Boyd (Project Supenntendent,l 4 ,1* 'h 7 1 ''I'' i 26 $85.00 $2.210.00
Ray Parks Project Foreman) 4 4' 4', .{' 5 4 3 1 1 1 t 3 2' .J 4 2 6' 1 6 6 3 5 1 I 119 $81.67 $9.718.73
Brian Smith (CerPenter Foreman) 8 S" 8 8 6 4 '3 6 S 1 4 5 I 83 $79.24 $6.576.92
Justin Rustler (Carpenter aporenticel . I 16 $57.27 $916.32
Scott Grout Laborer .~ 4 27 $65.08 $1,757.16
Mark/Coordinate Trucking ,. .0 4 $53.29 $213.16
Armando (Laborer : '. 5 13 $<0.00 520.00
TOTAL LABOR PEASE ft. 1 rr*-t ~ 1 3 Z 1 2 . 7 8 10
Kirk Parnham (Pipefitter/Plumber Super) '5 5', A.. 5 3 2.5 1 t 1 ,f? 1 .. 7 .6 59 $93.79 $5.533.61
Terrvl Burton PiDefitterlPlumber Foreman ",.j' .~ ' '" 7 7 7 7 s.s 8 8 6 1 1 '.2 3 3 8 113.5 $90.85 $10.311.48
Terry! Burton (OT) ,W .... 'iJlI, , H . ,1 I 1 $124.63 $124.63
Mike Biles PipefltterfPlumber Journeyman) ,t ~ -.- ,8'.. 3 19 $82.04 $1.558.76
Jeff O'Brien (Pipefitter/Plumber apprentice) .', 8 ;Sf 6 ':n.: 4 41 $82.04 $3,363.64
Shea Budlona (Plumber) WIN> '" ; $65.01
,.
Jeff Frazier (Plumber) 5 ,.3 7.. 8 .8 t 8 3d 82.5 $65.01 $5,363.33
Jeff Emmett Plumber 8 10 $87.91 $879.10
Jeff Emmett 0 n 1 1 $120.22 $120.22
Edward Bass Plumber apprentice * IJ~tkl H'C ;. 4 4 $65.40 $273.60
TOTAL LABOR PP 5 5l ri 11&t'il 10 6 '1i15 17 16 15 9 15 11 17 12 1 1 "111!' 8. ,2 :J 6 24" 6 I :J:J1 $27,528.:J6
TOTAL LABOR PEASE (PP/PS) I $49,440.65
E UIPMENT II 'Will ,.: ., .
Pease F-150 Ford 2x4 , ".t:i .."': 4 3 'J? 2 '. 6 3 5' ';3 i ~ 6 104 $10.20 $1,060.80
Pease F-150 Ford 4x4 8 6 .{ 6 ..Ii 4 5 68 $11.35 $771.80
Pease Traffic Control Equipment , 8 $12.00 $96.00
Man Retrieval Equipment/Gas monitor 3 .lJ 3 $52.50 $157.50
Peterbilt Boom truck & 7 8 S 8 77 $66.50 $5.120,50
F--800 Pease Dump Truck tit 8 5 21 $40.20 $844.20
PPI F-150 Ford 2><4 'r+- 5 3 l' 15 $10.20 $153.00
PPI icku 5 ~ o. 15.5 $11.35 $175.93
Subtotal $8,379.73
Markup 21% 0.21 $1,759.74
TOTAL $10,1:J9.47
MATERIAL AND RENTAL EQUIPMENT
Subtotal $ 17,970.18
Markup 21% $ 3,773.74
TOTAL $ 21,74:J.92
TOTAL PEASE AND SONS/PEASE PIPING $ 53,795.68
QUIGG BROTHERS COST SPREADSHEET I I I I I I I I I I
Work Date Grand Total
.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ... .. .. .. ... i~ I-
.. .. .. .. ... .. .. .. .. .. Ili~ 0
.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. "
.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ~ ~ ~ N N
N ~ ~ ;;: N N N .. ~ ~ N N 1il ~ ~ ~ ~ ~ ~ N I ~ ~ 0; "5 I! i~
0; t: a in iD ;:: ~ :2 ~ in ~ ~ a !:! t: ~ a i l: ~ ::l a
LABOR l: ~ ~ ~ N ;; ~ !!! l: N ~ ~ ~ !:! ~ ~ ~ ~ ~ ~ ~ &,g Total RT .3~ Total orr
.. .. .. 0 .. 0; .. .. .. 0; 0; .. .. .. 0
Hans Breivik 4 5 4 4 3 2 2 2.5 4.5 4.5 1 1.5 1.5 10 :\5 3 3 1 1.5 1.5 1 60.5 $68.55 $ 4,147.31 :),~ 93-AO S 46 to $ 4,194.01
Alice Carbon 9.5 7 8 8.5 2 8 8 5.5 4 10 10 "t:. 10 (1,$ 5 10 7 105.5 $48.62 $ 5.129.42 " 63,25 $ 5.0(;,:)0 $ 5,635.42
Alice Carlson $47.16 $ (11,(16 $
Ashley Beaty 9.5 7 8 8.5 4 10 10 u}; 10 ,.,~ 8.5 7.5 10 7 100 $47.16 $ 4,716.24 61,:5 s (,. Co $ 4,777.30
Shene Davi~non 4 10 10 0/, 10 ~:_& 34 $47.16 $ 1,603.52 (,1.GO S ':. i G,; $ 1,664.58
Brad Taylor 3.5 ,~,5 3.5 $31.28 $ 109.49 '~: S 1.5.68 > 11~~ '2::':; $ 223.69
Brad Taylor 6.5 " 6.5 $53.37 $ 346.89 5 n.37 S ~J5>1 ,e~ $ 698.74
Georae Middleton 6.5 6.5 $25.30 $ 164.43 ~ - $ 164.43
Ron Stiles 8.5 8.5 $25.30 $ 215.02 1 $ 215.02
TOTALS 4 11.5 33 11 14 16 20 10.5 2 2 2.5 12.5 12.5 6.5 1.5 14 40 1 33 2 33 2 9.5 7.5 6.5 22 15 325 $ 16,432.32 $1.140.a7 $17,573.19
Rate
EQUIPMENT (unloaded)
2003 Honda Accord 4 5 5 4 3 2 2 2.5 4.5 4.5 1 1.5 1.5 10.5 3 3 1 1.5 1.5 1 62 $ 12.00 $ 744.00
Dump Truck-53-531 10 2 12 $ 78.23 $ 938.76
Tilt Trailer-57-810 8 5 13 $ 13.55 $ 176.15
Cat 325 Excavator 2 3 4 4 13 $ 115.87 $ 1,506.31
Cat 325 Excavator - Stdby 6 5 4 4 19 $ 27.31 $ 518.89
JD 50 Excavator-13-501 8 7 8 8 31 $ 25.01 $ 775.31
Traffic Control Truck 9 7.5 8 8 8 8 5.5 4 10 10.5 10.5 10 7 106 $ 35.08 $ 3,718.48
07 Kenworth Tractor 55-401 6.5 6.5 $ 73.86 $ 480.09
00 55 ton Lowboy 6.5 8.5 15 $ 16.86 $ 252.90
00 kenworth Tractor 53-527 8.5 8.5 $ 49.84 $ 423.64
SUBTOTAL 4 18 48 33.5 24 27 8.5 2 2 2.5 12.5 12.5 6.5 1.5 5.5 20.5 13.5 13.5 1 1.5 12 8 286 $ 9,534.53
MARKUP {21%1 . $ 2,002.25
TOTAL $ 11,536.78
MARKUP
MATERIALS 21% I $ 8,524.47
RENTAL EQUIPMENT 21% I $ 30,827.02
I
GRAND;TOTAL I I $ 68,461.47
CITY OF BREMERTON wjd, 1/29/2009 I I I
SEWAGE PUMP STATION OB.1 PUMP STATION AND FORCE MAIN REPAIR I I I
Subcontractor to Quigg: C.A. Goodman
= = = = =
= = = = = = = = = = = = = = = = = Q Q Q Q Q C
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q 11,~1
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q N ~ ~ ~ N W WI
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 'Ot II) co co ~J CC)
= Q ... N II) co 'Ot II) co G) Q :!!:: ~ !2 t:: !!!! t!! ... ... ... ... ... <<
... ~ ~ ~ ~ ~ ~ ~ ~ ~ !2 0 0 0 0 0 00
LABOR co Q Q Q Q Q Q g~ SUM TOTAL
= = = = = G) G) G) G) G) ... ... ... ... ... ... ... ... ... ... ... ....:c
Herb Anderson Foreman 7.5 8 8 23.5 $69.43 $ 1,631.55
Cecil Goodman Foreman 8 8 8 7 8 5 10 10 10 8.5 9.5 6.5 5 7 7 118 $69.43 $ 8,157.77
Damon Bush Operator 5 9.5 7 8 8 8 8 8 7 8 5 10 10 10 8.5 9.5 6.5 5 7 7 155 $67.97 $ 10,535.37
Cecil Goodman (OT) Foreman C.S 0.5 C.5 1.5 $95.71 $ 143.57
Damon Bush (OT) Operator C.5 0.5 C.5 1.5 $93.50 $ 140.25
Chris Bunker Operator 5 9.5 7 8 8 37.5 $55.24 $ 2,071.42
TOTAL LABOR $22,679.92
EQUIPMENT
Subaru Outback 7.5 8 8 23.5 $12.00 $ -
1993 Ford F2504wd 5 9.5 8 8 8 38.5 $17.42 $ 670.67
2000 Ford F-350 8 8 8 7 8 5 10.5 10.5 10.5 8.5 9.5 6.5 5 7 7 119 $25.63 $ 3,049.97
Hitachi EX 135 UR 1998 8 8 4 7 8 5 10.5 10.5 10.5 8.5 . 7 5 3 7 7 109 $83.61 $ 9,113.49
SUBTOTAL I $ 12,834.13
MARKUP I 21% $ 2,695.17
TOTAL EQUIPMENT $ 15,529.30
I
MATERIALS I
Gallagher Farms on 9/24/08 $ 512.00
Gallagher F arms on 9/30/08 $ 512.00
Gallagher Farms on 10/10/08 $ 30.00
Gallagher Farms on 10/21/08 $ 1,024.00
SUBTOTAL I $ 2,078.00
. MARKUP I 21% $ 436.38
TOTAL MATERIALS $ 2,514.38
I
GRAND TOTAL $40,723.60
CITY OF BREMERTON wjd; 1/27/04
SEWAGE PUMP STATION OB-1 PUMP STATION AND FORCE MAIN REPAIR
Pease & Sons
Materials and Rental Eauipment AMOUNT
Bond $1,124.00
Affidavit of Wages $160.00
Evergreen - Core drill pump station $260.00
Evergreen - Sawcut asphalt on road $500.00
Evergreen - Sawcut road $650.00
Fastco - All thread $413.16
Ferguson - extrusion gun rental $1,729.92
Fred Hill - Concrete on 8/25 $333.00
Fred Hill - Concrete on 10/9 $594.00
Fred Hill - Concrete on 10/10 $159.00
Fred Hill - Ecology blocks on 8/21 $323.75
H.D. Fowler - SS Strap for 36" HDPE $106.60
Kistap Lumber - Screws, paint $7.78
NW Wire Rope on 8/19 $192;80
NW Wire Rope on 9/30 $342.04
Honeybucket $237.65
Puget Sound Pipe and Supply $328.66
Demolition disposal $186.95
Star Rentals - Vibratory equipment $469.15
Star Rentals - Generator, pump hose $569.14
Star Rentals - Forklift $3,889.40
Star Rentals - Concrete breaking tools $86.34
Star Rentals - Off-Road Diesel $2,133.56
Star Rentals - Forklift, generator, diesel off-road $1,935.00
Star Rentals - Generator $144.80
Stacy plumbing - clevis hangers $201.49
Shipping $411.32
White Cap - jute mat $101.00
White cap - jute mat $45.00
Misc. $334.67
SUBTOTAL $17,970.18
MARKUP @210.10 $3,773.74
TOTAL $21,743.92
CITY OF BREMERTON wjd, 1/29/2009
SEWAGE PUMP STATION OB-1 PUMP STATION AND FORCE MAIN REPAIR
QUIGG BROTHERS
RENTAL EQUIPMENT AND MATERIAL INVOICE COST SUMMARY
RENTAL EQUIPMENT
Item Date Amount
All West Underground - Trench Box 8/31/2008 $ 4,525.18
All West Underground - Trench Box 9/23/2008 $ 4,264.54
All West Underground - Trench Box 10/15/2008 $ 3,181.28
All West Underground - Trench Box 10/9/2008 $ (1,282.32)
All West Underground - Trench Box 10/9/2008 $ (269.62)
All West Underground - Trench Box $ (1,150.80)
All West Underground - Trench Box $ 1,867.58
All West Underground 10/23/2008 $ 447.64
C.A. Goodman, 4 steel sheets 10/21/2008 $ 1,368.36
Star Rentals 9/23/2008 $ 448.79
Star Rentals 8/27/2008 $ 427.43
Sunbelt 9/29/2008 $ 1,227.28
Sunbelt 10/16/2008 $ 3,436.02
United Rentals 9/26/2008 $ 916.43
United Rentals 10/9/2008 $ 553.43
United Rentals 10/22/2008 $ 5,482.54
United Rentals 10/16/2008 $ 33.12
. ..
TOT ALRENTAL $ 25J476.~8
I I
MATERIALS
Item Date Amount
Ace Paving: 1-1/4" minus 8/21/2008 $ 128.43
Ace Paving: broken asphalt 8/22/2008 $ 48.20
Ace Paving: 1-1/4" minus 8/25/2008 $ 342.62
Ace Paving: trucking 8/8/2008 $ 187.50
Capitol Pilot and permit 8/27/2008 $ 382.24
Ace Paving: CSTC and crushed materia 10/1/2008 $ 472.09
Ace Paving: trucking 10/1/2008 $ 270.00
Ace Paving: 3/4" minus 10/7/2008 $ 372 .46
Ace Paving: trucking 10/8/2008 $ 135.00
Ace Paving: trucking 10/8/2008 $ 270.00
Ace Paving: 1-1/4" minus and crushed r 10/15/2008 $ 769.11
Ace Paving: crushed material 10/16/2008 $ 71.15
Highway Specialties: signs 8/22/2008 $ 2,571.25
Home Depot: poly sheet 8/24/2008 $ 97.01
Home Depot: poly sheet 10/5/2008 $ 172.22
Lakeside Industries 8/20/2008 $ 651.25
Tacoma Screw Products .9./30/2008 $ 104.49
TOTAL' MATERIAlS -. . :.~.' $ >7,045.02
.-, .. .-- - '.- .: :.',,(: . ..c.. . .:::........ ':.,....
CITY OF BREMERTON wjd
SEWAGE PUMP STATION OB-1 PUMP STATION AND FORCE MAIN REPAIR 1/29/2009
SUNBEL T RENTALS - SERVICE COMPANY: HOPE SUPPLIER AND LABOR
From Invoice:
LABOR $13,861.50
MATERIALS $22,399.08
EQUIPMENT $2,555.00
FREIGHT/OTHER $4,197.36
SUBTOTAL $43,012.94
TAX ON RENTAL $219.73
TOTAL SUNBEL T $43,232.67
Note: Sun belt Rentals is a service contractor hired by Pease and Sons. Markup up 21 %.
Contract Number:
Vendor:
Subject:
Department:
File Class:
Begin Date:
End Date:
Review Date:
Vault Date:
Comments:
4748
PEASE & SONS INC
OB-1 Pump Station & Force Main Repair
Engineering
LEG 12-1
08/18/2008
09/30/2008
10/01/2008
,j
PUBLIC WORKS AGREEMENT
THIS AGREEMENT, is entered into between the City of Bremerton, a Washington
Municipal Corporation ("City"), and Pease & Sons Inc. ("Contractor"), whose mailing address is
P.O. Box 44100 Tacoma, WA, WA ~-~.
9S#8- OIOQ~
The parties agree as follows: ~
1. CONTRACTOR SERVICES. The Contractor shall perform emergency
construction services, in accordance with generally accepted standards and at the direction of the
Public Works Director (Director) for the following project:
Provide labor, equipment, and materials to upgrade Sewage Pump Station OB-1 and
install approximately 120 feet of force main immediately outside the pump station as
noted on the attached plan sheet and as discussed during the site meetings on July 22
and July 31, 2008. The City is prepurchasing all epoxy-lined ductile iron pipe and
fittings that require a lengthy lead time. The Contractor shall purchase
miscellaneous fittings, restraints and other materials as directed by the City.
The Contractor shall purchase and install materials, and contract with a pipe fusion
services company (as needed) to install approximately 120 LF of 12" HDPE
(PE3048) pipe, beginning immediately outside the pump station and terminating
immediately south of the thrust block located at the top of the slope north of Kitsap
Way.
The City will be responsible for bypassing all flow while the pump station and force
main are under construction.
All work shall be performed under the control of the Director as provided in Section 1-05
CONTROL OF WORK of the Washington State Department of Transportation Standard
Specifications for Road, Bridge and Municipal Construction 2008 ("Standard Specifications")
2. TIME OF COMPLETION. Time is of the essence for completion of this work.
Contractor shall complete the work in a reasonable time frame. given the current conditions of the
site and based on the amount and type of work directed to be done by the Director.
3. COMPENSATION. The City shall pay the Contractor, for the work and services
contemplated in this agreement, on a Time and Materials Basis as calculated in Section 1-09.6
FORCE ACCOUNT of the Standard Specifications, provided in addition to on-site labor, the
Contractor shall be compensated for necessary on-site supervision as approved by the City. This
compensation shall not exceed the total amount of $100,000 plus any applicable Washington State
Sales Tax. The Contractor shall invoice the City upon completion of the work. The City will pay
for the portion of the work described in the invoice that has been completed by the Contractor and
approved by the City. The City payment shall not constitute a waiver of the City's right to final
inspection and acceptance of the project.
A. Performance Bond. Within 5 days of written notice to proceed and pursuant
to Chapter 39.08 RCW, the Contractor, shall provide the City a performance
bond for the amount indicated above, to be in effect until sixty (60) days after
Public Works Agreement
City of BremertonlPease and Sons
08-1 Pump Station and Force Main Repair
August 2008
Page 1 of6
the date of final acceptance, or until receipt of all necessary releases from the
State Department of Revenue and the State Department of Labor and
Industries and until settlement of any liens filed under Chapter 60.28 RCW,
whichever is later.
B. Retainage. The City shall hold back a retainage in the amount of five percent
(5%) of any and all payments made to contractor for a period of sixty (60)
days after the date of final acceptance, or until receipt of all necessary
releases from the State Department of Revenue and the State Department of
Labor & Industries and until settlement of any liens filed under Chapter 60.28
RCW, whichever is later.
C. Defective or Unauthorized Work. The City reserves its right to withhold
payment from Contractor for any defective or unauthorized work. Defective
or unauthorized work includes, without limitation: work and materials that
do not conform to the requirements of this agreement; and extra work and
materials furnished without the City's written approval. If Contractor is
unable, for any reason, to satisfactorily complete any portion of the work, the
City may complete the work by contract or otherwise, and Contractor shall be
liable to the City for any additional costs incurred by the City. "Additional
costs" shall mean all reasonable costs, including legal costs and attorney fees,
incurred by the City beyond the maximum Contract price specified above.
The City further reserves its right to deduct the cost to complete the Contract
work, including any Additional Costs, from any and all amounts due or to
become due the Contractor.
D. Final Payment: Waiver of Claims. THE MAKING OF FINAL PAYMENT
(EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A
WAIVER OF CLAIMS, EXCEPT THOSE PREVIOUSLY AND
PROPERL Y MADE AND IDENTIFIED BY CONTRACTOR AS
UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS
MADE.
4. INDEPENDENT CONTRACTOR. The parties intend that an Independent
Contractor - Employer Relationship will be created by this agreement, the City being interested
only in the results obtained under this agreement.
5. TERMINATION. The City may terminate this agreement when determined by the
Director to be in the best interest of the City. In the event of termination, the Contractor shall be
compensated for all work completed, including all materials acquired for the project, through the
effective date of termination. All such materials acquired for the project shall become the property
of the City. If the City terminates this agreement, the Contractor shall not receive any further
monies under this agreement.
6. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay
Prevailing Wages," with the State of Washington Department of Labor & Industries prior to
commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter
39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate
provisions. The latest prevailing wage rate revision issued by the Department of Labor and
Industries is attached.
Public Works Agreement
City of BremertonlPease and Sons
OB-l Pump Station and Force Main Repair
August 2008
Page 2 of6
7. CLAIMS. The Contractor shall give written notice to the City of all claims within
fourteen (14) calendar days of the occurrence of the events giving rise to the claims. Any claim for
damages, additional payment for any reason, or extension of time, whether under this agreement or
otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely
written claim is made in strict accordance with the applicable provisions of this agreement; or, if
(and only if) no such provision is applicable, unless that claim is set forth in detail in writing and
received by the City within seven (7) calendar days from the date Contractor knew, or should have
known, of the facts giving rise to the claim. At a minimum, a Contractor's written claim must
include the information set forth regarding protests in Section 7.A.2.a.-e.
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM
WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS
ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM
OR CAUSED BY THA T DELAY.
Contractor must, in any event, file any claim or bring any suit arising from or connected
with this agreement within 120 calendar days from the date the contract work is complete.
8. WARRANTY. The Contractor shall correct all defects in workmanship and
materials within one year from the date of the City's acceptance of the Contract work. When
defects are corrected, the warranty for that portion of the work shall extend for one year form the
date such correction is completed and accepted by the City. The Contractor shall begin to correct
any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the
Contractor does not accomplish the corrections within a reasonable time, the City may complete the
corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the
correction.
9. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its
officer, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits including all legal costs and attorney fees, arising out of or in connection
with the performance of this agreement, except for injuries and damages caused by the City's
negligence.
The City's inspection or acceptance of any of Contractor's work when completed shall not
be grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor and
the City, its officials, employees, agents and volunteers, the Contractor's liability hereunder shall be
only to the extent of the Contractor's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS
INDEMNIFICATION CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY
UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF THIS
INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE MUTUALLY
NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration or termination of this agreement.
Public Works Agreement
City of BremertonlPease and Sons
OB-I Pump Station and Force Main Repair
August 2008
Page 3 of6
10. INSURANCE. The Contractor shall procure and maintain for the duration of this
agreement insurance of the types and in the amounts described below against claims for injuries to
persons or damage to property which may arise from or in connection with the performance of the
work by the Contractor, its agents, representative, employees, subconsultants or subcontractors.
Before beginning work on the project described in this agreement, the Contractor shall
provide a Certificate of Insurance evidencing:
1. Automobile Liability insurance with limits no less than $1,000,000 combined
single limit per accident for bodily injury and property damage; and
2. Commercial General Liability insurance written on an occurrence basis with
limits no less than $1,000,000 combined single limit per occurrence and
general aggregate for personal injury, bodily injury and property damage.
Coverage shall include but not be limited to: blanket contractual;
products/completed operationslbroad form property damage; explosion,
collapse and underground (XCD); and employer's liability.
3. Excess Liability insurance with limits not less than $1,000,000 per
occurrence and aggregate.
Any payment of deductible or self insured retention shall be the sole responsibility of the
Contractor.
The City, its officials, employees, agents and volunteers shall be named as an additional
insured on the insurance policy, as respects work performed by or on behalf of the Contractor and a
copy of the endorsement naming the City as additional insured shall be attached to the Certificate of
Insurance.
The Contractor's insurance shall contain a clause stating that coverage shall apply
separately to each insured against whom claim is made or suit is brought, except with respects to the
limits ofthe insurer's liability.
The Contractor's insurance shall be primary insurance as respects the City, and the City
shall be given thirty (30) calendar days prior written notice by certified mail, return receipt
requested, of any cancellation, suspension or material change in coverage.
11. MISCELLANEOUS.
A. Nondiscrimination. In the hiring of employees for the performance of work
under this Agreement or any sub-contract hereunder, the Contractor, its sub-contractors, or any
person acting on behalf of such Contractor or sub-contractor shall not, by reason of race, religion,
color, sex, national origin, or the presence of any sensory, mental, or physical disability,
discriminate against any person who is qualified and available to perform the work to which the
employment relates.
B. Compliance with Laws. Contractor shall comply with all federal, state and
local laws, rules and regulations throughout every aspect in the performance of this agreement.
Public Works Agreement
City of BremertonlPease and Sons
OB-l Pump Station and Force Main Repair
August 2008
Page 4 of6
C. Work Performed at Contractor's Risk. Contractor shall take all precautions
necessary and shall be responsible for the safety of its employees, agents, and subcontractors in the
performance of this agreement. All work shall be done at Contractor's own risk, and Contractor
shall be responsible for any loss of or damage to materials, tools, or other articles used or held for
use in connection with the work.
D. Nonwaiver of Breach. The failure of the City to insist upon strict
performance of any of the terms and rights contained herein, or to exercise any option herein
conferred in one or more instances, shall not be constructed to be a waiver or relinquishment of
those terms and rights and they shall remain in full force and effect
E. Governing Law. This agreement shall be governed and construed in
accordance with the laws of the State of Washington. If any dispute arises between the City and
Contractor under any of the provisions of this agreement, resolution of that dispute shall be
available only through the jurisdiction, venue and rules of the Kitsap County Superior Court, Kitsap
County, Washington.
F. Attorney's Fees. To the extent not inconsistent with RCW 39.04.240, in any
claim or lawsuit for damages arising from the parties' performance of this agreement, each party
shall be responsible for payment of its own legal costs and attorney's fees incurred in defending or
bringing such claim or lawsuit; however, nothing in this subsection shall limit the City's right to
indemnification under Section 10 of this agreement.
G. Written Notice. All communications regarding this agreement shall be sent
to the parties at the addresses listed on the signature page of this agreement, unless otherwise
notified. Any written notice shall become effective upon delivery, but in any event three (3)
calendar days after the date of mailing by registered or certified mail, and shall be deemed
sufficiently given if sent to the addressee at the address stated on this agreement.
H. Assignment. Any assignment of this agreement by the Contractor without
the written consent of the City shall be void.
I. Modification. No waiver, alteration, or modification of any of the provisions
of this agreement shall be binding unless in writing and signed by a duly authorized representative
ofthe City and Contractor.
J. Severability. If anyone or more sections, sub-sections, or sentences of this
agreement are held to be unconstitutional or invalid, that decision shall not affect the validity of the
remaining portion of this agreement and the remainder shall remain in full force and effect.
Public Works Agreement
City of Bremerton!Pease and Sons
OB-l Pump Station and Force Main Repair
August 2008
Page 5 of6
K. Entire Agreement. The written provlSlons and terms of this agreement,
together with any attached Exhibits, supersede all prior verbal statements by any representative of
the City, and those statements shall not be construed as forming a part of or altering in any manner
this agreement. This agreement and any attached Exhibits contain the entire agreement between the
parties. Should any language in any Exhibit to this agreement conflict with any language contained
in this agreement, the terms of this agreement shall prevail.
IN WITNESS WHEREOF, the parties below have executed this agreement.
~OF~
Cary Bozeman
Mayor
DA TE: I ~ of August, 2008
Notices to be sent to:
Notices to be sent to:
CONTRACTOR:
CITY OF BREMERTON:
Pease & Sons Inc.
P.O. Box 44100
Tacoma, W A, W A 98444-0100
City Clerk
ATTN: Carol Etgen
345 Sixth Street
Bremerton, WA 98337
Dept. of PW &U - Engineering Division
ATTN: Bill Davis
3027 Olympus Drive
Bremerton, W A 98310
ATTEST:
Public Works Agreement
City of BremertonlPease and Sons
OB-l Pump Station and Force Main Repair
August 2008
Page 60f6
#7177 - Bremerton OB-1 Pump Station Emergency Contract
Pease labor Rates
Rates as of 6/1/08*
Local 26 Local 26 Local 26 Local 26 Local 26 Local 26
Plumber Plumber Plumber Carpenter Carpenter Carpenter
DESCRIPTION % Foreman Foreman OT Foreman PT Plumber Plumber OT Plumber PT Foreman Foreman OT Foreman PT
1 BASE WAGE (TAXABLE) $ 40.70 $ 61.05 $ 81.40 $ 37.00 $ 55.50 $ 74.00 $ 38.05 $ 57.08 $ 76.10
2 FRINGE $ 16.12 $ 16.12 $ 16.12 $ 16.12 $ 16.12 $ 16.12 $ 11.57 $ 11.57 $ 11.57
3 FICA / MEDICARE 7.650% $ 3.11 $ 4.67 $ 6.23 $ 2.83 $ 4.25 $ 5.66 $ 2.91 $ 4.37 $ 5.82
4 FEDERAL UNEMPLOYMENT 0.80% $ 0.33 $ 0.49 $ 0.65 $ 0.30 $ 0.44 $ 0.13 $ 0.30 $ 0.46 $ 0.61
5 STATE UNEMPLOYMENT 6.14% $ 2.50 $ 3.75 $ 5.00 $ 2.27 $ 3.41 $ 0.35 $ 2.34 $ 3.50 $ 4.67
6 INSURANCE 8.50% $ 3.46 $ 5.19 $ 6.92 $ 3.15 $ 4.72 $ 0.01 $ 3.23 $ 4.85 $ 6.47
7 INDUSTRIAL INSURANCE $ 1.93 $ 1.93 $ 1.93 $ 1.93 $ 1.93 $ 1.93 $ 3.02 $ 3.02 $ 3.02
SUBTOTAL $ 68.15 $ 93.20 $ 118.25 $ 63.59 $ 86.36 $ 98.20 $ 61.43 $ 84.84 $ 108.26
8 OVERHEAD AND PROFIT 29.00% $ 19.76 $ 27.03 $ 34.29 $ 18.44 $ 25.05 $ 28.48 $ 17.81 $ 24.60 $ 31.40
TOTAL PER HOUR $ 87.91 $ 120.22 $ 152.54 $ 82.04 $ 111.41 $ 126.68 $ 79.24 $ 1 09.45 $ 139.66
Laborer Laborer Laborer
DESCRIPTION % Carpenter Carpenter OT Carpenter PT Foreman Foreman OT Foreman PT Laborer Laborer OT Laborer PT
1 BASE WAGE (TAXABLE) $ 34.59 $ 51.89 $ 69.18 $ 31.66 $ 47.49 $ 63.32 $ 29.66 $ 44.49 $ 59.32
2 FRINGE $ 11.57 $ 11.57 $ 11.57 $ 8.46 $ 8.46 $ 8.46 $ 8.46 $ 8.46 $ 8.46
3 FICA / MEDICARE 7.650% $ 2.65 $ 3.97 $ 5.29 $ 2.42 $ 3.63 $ 4.84 $ 2.27 $ 3.40 $ 4.54
4 FEDERAL UNEMPLOYMENT 0.80% $ 0.28 $ 0.42 $ 0.55 $ 0.25 $ 0.38 $ 0.51 $ 0.24 $ 0.36 $ 0.47
5 STATE UNEMPLOYMENT 6.14% $ 2.12 $ 3.19 $ 4.25 $ 1.94 $ 2.92 $ 3.89 $ 1.82 $ 2.73 $ 3.64
6 INSURANCE 8.50% $ 2.94 $ 4.41 $ 5.88 $ 2.69 $ 4.04 $ 5.38 $ 2.52 $ 3.78 $ 5.04
7 INDUSTRIAL INSURANCE $ 3.02 $ 3.02 $ 3.02 $ 3.02 $ 3.02 $ 3.02 $ 3.02 $ 3.02 $ 3.02
SUBTOTAL $ 57.17 $ 78.46 $ 99.74 $ 50.45 $ 69.94 $ 89.42 $ 47.99 $ 66.24 $ 84.50
8 OVERHEAD AND PROFIT 29.00% $ 16.58 $ 22.75 $ 28.93 $ 14.63 $ 20.28 $ 25.93 $ 13.92 $ 19.21 $ 24.50
TOTAL PER HOUR $ 73.75 $ 101.21 $ 128.67 $ 65.08 $ 90.22 $ 115.35 $ 61.91 $ 85.45 $ 109.00
\\Rainier\HOME\Jenn\Projects\#7177 - Bremerton OB-1 Pump Station Emergency Contract\WSDOT Labor Rates for Emergency Contract
APPENDIX A
PREVAILING WAGES FOR KITSAP
COUNTY
State of Washington
DEPARTMENT OF LABOR AND INDUSTRIES
Prevailing Wage Section - Telephone (360) 902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage Rates For Public Works Contracts
The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits.
On public works projects, workers' wage and benefit rates must add to not less than this total. A brief description
of overtime calculation requirements is provided on the Benefit Code Key.
KITSAP COUNTY
Effective 03-02-08
**********************************************************************************************************
Classification
ASBESTOS ABATEMENT WORKERS
JOURNEY LEVEL
BOILERMAKERS
JOURNEY LEVEL
BRICK AND MARBLE MASONS
JOURNEY LEVEL
CABINET MAKERS (IN SHOP)
JOURNEY LEVEL
CARPENTERS
ACOUSTICAL WORKER
BRIDGE, DOCK AND WARF CARPENTERS
CARPENTER
CREOSOTED MATERIAL
DRYWALL APPLICATOR
FLOOR FINISHER
FLOOR LAYER
FLOOR SANDER
MILLWRIGHT AND MACHINE ERECTORS
PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING
SAWFILER
SHINGLER
STATIONARY POWER SAW OPERATOR
STATIONARY WOODWORKING TOOLS
CEMENT MASONS
JOURNEY LEVEL
DIVERS & TENDERS
DIVER
DIVER TENDER
DREDGE WORKERS
ASSISTANT ENGINEER
ASSISTANT MATE (DECKHAND)
BOATMEN
ENGINEER WELDER
LEVERMAN, HYDRAULIC
MAINTENANCE
MATES
OILER
DRYWALL TAPERS
JOURNEY LEVEL
ELECTRICAL FIXTURE MAINTENANCE WORKERS
JOURNEY LEVEL
Page 1
PREVAILING
WAGE
(See Benefit Code Key)
Over
Time Holiday
Code Code
Note
Code
$36.24
5D
1H
$30.34
$43.75
1M
5A
$12.53
$43.91
$43.75
$43.75
$43.85
$43.79
$43.75
$43.75
$43.75
$44.75
$43.95
$43.75
$43.75
$43.75
$43.75
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 50
1M 5D 8A
1M 5D
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1E 5P
$44.58
$85.75
$44.22
$44.59
$44.08
$44.59
$44.64
$46.21
$44.08
$44.59
$44.21
$43.59
$9.37
KITSAP COUNTY
Effective 03-02-08
**********************************************************************************************************
(See Benefit Code Key)
Over
PREVAILING lime Holiday Note
Classification WAGE Code Code Code
ELECTRICIANS - INSIDE
CABLE SPLICER $55.05 1E 5A
CABLE SPLICER (TUNNEL) $58.86 1E 5A
CERTIFIED WELDER $53.16 1E 5A
CERTIFIED WELDER (TUNNEL) $57.15 1E 5A
CONSTRUCTION STOCK PERSON $28.83 1E 5A
JOURNEY LEVEL $51.25 1E 5A
JOURNEY LEVEL (TUNNEL) $55.05 1E 5A
ELECTRICIANS - MOTOR SHOP
CRAFTSMAN $15.37 2A 6C
JOURNEY LEVEL $14.69 2A 6C
ELECTRICIANS - POWERLlNE CONSTRUCTION
CABLE SPLICER $56.53 4A 5A
CERTIFIED LINE WELDER $51.64 4A 5A
GROUNDPERSON $37.15 4A 5A
HEAD GROUNDPERSON $39.19 4A 5A
HEAVY LINE EQUIPMENT OPERATOR $51.64 4A 5A
JACKHAMMER OPERATOR $39.'19 4A 5A
JOURNEY LEVEL L1NEPERSON $51.64 4A 5A
LINE EQUIPMENT OPERATOR $43.83 4A 5A
POLE SPRAYER $51.64 4A 5A
POWDERPERSON $39.19 4A 5A
ELECTRONIC TECHNICIANS
ELECTRONIC TECHNICIANS JOURNEY LEVEL $40.08 10 5A
ELEVATOR CONSTRUCTORS
MECHANIC $60.85 4A 6Q
MECHANIC IN CHARGE $66.25 4A 6Q
FABRICATED PRECAST CONCRETE PRODUCTS
ALL CLASSIFICATIONS $13.50
FENCE ERECTORS
FENCE ERECTOR $13.80
FENCE LABORER $11.60
FLAGGERS
JOURNEY LEVEL $31.01 1H 50
GLAZIERS
JOURNEY LEVEL $43.76 1H 5G
HEAT & FROST INSULATORS AND ASBESTOS WORKERS
MECHANIC $46.59 1S 5J
HEATING EQUIPMENT MECHANICS
MECHANIC $18.45
HOD CARRIERS & MASON TENDERS
JOURNEY LEVEL $36.75 1H 5D
INDUSTRIAL ENGINE AND MACHINE MECHANICS
MECHANIC $15.65
INDUSTRIAL POWER VACUUM CLEANER
JOURNEY LEVEL $9.24
INLAND BOATMEN
CAPTAIN $38.87 1K 58
COOK $32.73 1K 58
DECKHAND $32.42 1K 58
ENGINEER/DECKHAND $35.20 1K 5B
MATE, LAUNCH OPERATOR $36.85 1K 5B
Page 2
KITSAP COUNTY
Effective 03-02-08
**********************************************************************************************************
Classification
INSPECTION/CLEANING/SEALING OF SEWER & WATER SYSTEMS BY
REMOTE CONTROL
CLEANER OPERATOR, FOAMER OPERATOR
GROUT TRUCK OPERATOR
HEAD OPERATOR
TECHNICIAN
TV TRUCK OPERATOR
INSULATION APPLICATORS
JOURNEY LEVEL
IRONWORKERS
JOURNEY LEVEL
LABORERS
ASPHALT RAKER
BALLAST REGULATOR MACHINE
BATCH WEIGHMAN
. BRUSH CUTTER
BRUSH HOG FEEDER
BURNERS
CARPENTER TENDER
CASSION WORKER
CEMENT DUMPER/PAVING
CEMENT FINISHER TENDER
CHANGE-HOUSE MAN OR DRY SHACKMAN
CHIPPING GUN (OVER 30 LBS)
CHIPPING GUN (UNDER 30 LBS)
CHOKER SETTER
CHUCK TENDER
CLEAN-UP LABORER
CONCRETE DUMPER/CHUTE OPERATOR
CONCRETE FORM STRIPPER
CONCRETE SAW OPERATOR
CRUSHER FEEDER
CURING LABORER
DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED MATERIALS)
DITCH DIGGER
DIVER
DRILL OPERATOR (HYDRAULIC, DIAMOND)
DRILL OPERATOR, AIRTRAC
DUMPMAN
EPOXY TECHNICIAN
EROSION CONTROL WORKER
FALLER/BUCKER, CHAIN SAW
FINAL DETAIL CLEANUP (Le., dusting, vacuuming, window cleaning; NOT
construction debris cleanup)
FINE GRADERS
FIRE WATCH
FORM SETTER
GABION BASKET BUILDER
GENERAL LABORER
GRADE CHECKER & TRANSIT PERSON
GRINDERS
GROUT MACHINE TENDER
Page 3
PREVAILING
WAGE
$9.73
$11.48
$12.78
$8.07
$24.17
$43.75
$47.92
$36.75
$36.24
$31.01
$36.24
$36.24
$36.24
$36.24
$37.20
$36.75
$36.24
$36.24
$36.75
$36.24
$36.24
$36.24
$36.24
$36.75
$36.24
$36.75
$31.01
$36.24
$36.24
$36.24
$37.20
$36.75
$37.20
$36.24
$36.24
$36.24
$36.75
$28.45
$36.24
$31.01
$36.24
$36.24
$36.24
$36.75
$36.24
$36.24
(See Benefit Code Key)
Over
Time Holiday
Code Code
Note
Code
1M 5D
10 5A
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
1H 5D
KITSAP COUNTY
Effective 03-02-08
**********************************************************************************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
GUARDRAIL ERECTOR $36.24 1H 5D
HAZARDOUS WASTE WORKER LEVEL A $37.20 1H 5D
HAZARDOUS WASTE WORKER LEVEL B $36.75 1H 5D
HAZARDOUS WASTE WORKER LEVEL C $36.24 1H 5D
HIGH SCALER $37.20 1H 5D
HOD CARRIER/MORT ARMAN $36.75 1H 5D
JACKHAMMER $36.75 1H 5D
LASER BEAM OPERATOR $36.75 1H 5D
MANHOLE BUILDER-MUDMAN $36.75 1H 5D
MATERIAL YARDMAN $36.24 1H 5D
MINER $37.20 1H 5D
NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH $36.75 1H 5D
PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST, GUNITE,
SHOTCRETE, WATER BLASTER
PAVEMENT BREAKER $36.75 1H 5D
PILOT CAR $31.01 1H 5D
PIPE POT TENDER $36.75 1H 5D
PIPE RELlNER (NOT INSERT TYPE) $36.75 1H 5D
PIPELAYER & CAULKER $36.75 1H 5D
PIPELAYER & CAULKER (LEAD) $37.20 1H 5D
PIPEWRAPPER $36.75 1H 5D
POT TENDER $36.24 1H 5D
POWDER MAN $37.20 1H 5D
POWDER MAN HELPER $36.24 1H 5D
POWERJACKS $36.75 1H 5D
RAILROAD SPIKE PULLER (POWER) $36.75 1H 5D
RE-TIMBERMAN $37.20 1H 5D
RIPRAP MAN $36.24 1H 5D
RODDER $36.75 1H 5D
SCAFFOLD ERECTOR $36.24 1H 5D
SCALE PERSON $36.24 1H 5D
SIGNALMAN $36.24 1H 5D
SLOPER (OVER 20") $36.75 1H 5D
SLOPER SPRAYMAN $36.24 1H 5D
SPREADER (CLARY POWER OR SIMILAR TYPES) $36.75 1H 5D
SPREADER (CONCRETE) $36.75 1H 5D
STAKE HOPPER $36.24 1H 5D
STOCKPILER $36.24 1H 5D
TAMPER & SIMILAR ELECTRIC, AIR & GAS $36.75 1H 5D
TAMPER (MULTIPLE & SELF PROPELLED) $36.75 1H 5D
TOOLROOM MAN (AT JOB SITE) $36.24 1H 5D
TOPPER-TAILER $36.24 1H 5D'
TRACK LABORER $36.24 1H 5D
TRACK LINER (POWER) $36.75 1H 5D
TRUCK SPOTTER $36.24 1H 5D
TUGGER OPERATOR $36.75 1H 5D
VIBRATING SCREED (AIR, GAS, OR ELECTRIC) $36.24 1H 5D
VIBRATOR $36.75 1H 5D
VINYL SEAMER $36.24 1H 5D
WELDER $36.24 1H 5D
WELL-POINT LABORER $36.75 1H 5D
Page 4
KITSAP COUNTY
Effective 03-02-08
**********************************************************************************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
LABORERS - UNDERGROUND SEWER & WATER
GENERAL LABORER $36.24 1H 5D
PIPE LAYER $36.75 1H 5D
LANDSCAPE CONSTRUCTION
IRRIGATION OR LAWN SPRINKLER INSTALLERS $9.25
LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $10.05
LANDSCAPING OR PLANTING LABORERS $12.92
LATHERS
JOURNEY LEVEL $43.79 1M 5D
METAL FABRICATION (IN SHOP)
FITTER $26.96
LABORER $8.07
MACHINE OPERATOR $13.83
WELDER $13.83
MODULAR BUILDINGS
CABINET ASSEMBLY $11.56
ELECTRICIAN $11.56
EQUIPMENT MAINTENANCE $11.56
PLUMBER $11.56
PRODUCTION WORKER $9.40
TOOL MAINTENANCE $11.56
UTILITY PERSON $11.56
WELDER $11.56
PAINTERS
JOURNEY LEVEL $33.94 2B 5A
PLASTERERS
JOURNEY LEVEL $43.10 1R 5B
PLAYGROUND & PARK EQUIPMENT INSTALLERS
JOURNEY LEVEL $8. 54
PLUMBERS & PIPEFITTERS
JOURNEY LEVEL $50.92 1G 5A
POWER EQUIPMENT OPERATORS
ASSISTANT ENGINEERS $42.14 1T 5D 8L
BACKHOE, EXCAVATOR, SHOVEL (3 YD & UNDER) $44.92 1T 5D 8L
BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YD & UNDER 6 YD) $45.41 1T 5D 8L
BACKHOE, EXCAVATOR, SHOVEL (6 YD AND OVER WITH ATTACHMENTS) $45.96 1T 5D 8L
BACKHOES, (75 HP & UNDER) $44.50 1T 5D 8L
BACKHOES, (OVER 75 HP) $44.92 1T 5D 8L
BARRIER MACHINE (ZIPPER) $44.92 1T 5D 8L
BATCH PLANT OPERATOR, CONCRETE $44.92 1T 5D 8L
BELT LOADERS (ELEVATING TYPE) $44.50 1T 5D 8L
BOBCAT (SKID STEER) $42.14 1T 5D 8L
BROOMS $42.14 1T 5D 8L
BUMP CUTTER $44.92 1T 5D 8L
CABLEWAYS $45.41 1T 5D 8L
CHIPPER $44.92 1T 5D 8L
COMPRESSORS $42.14 1T 5D 8L
CONCRETE FINISH MACHINE - LASER SCREED $42.14 1T 5D 8L
CONCRETE PUMPS $44.50 1T 5D 8L
CONCRETE PtJMP- TRUCK MOUNT WITH BOOM ATTACHMENT $44.92 1T 5D 8L
CONVEYORS $44.50 1T 5D 8L
CRANES, THRU 19 TONS, WITH ATTACHMENTS $44.50 1T 5D' 8L
Page 5
KITSAP COUNTY
Effective 03-02-08
**********************************************************************************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
CRANES, 20 - 44 TONS, WITH ATTACHMENTS $44.92 1T 5D 8L
CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB $45.41 1T 5D 8L
WITH ATACHMENTS)
CRANES, 100 TONS - 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB $45.96 1T 5D 8L
WITH ATTACHMENTS)
CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $46.53 1T 5D 8L
WITH ATTACHMENTS)
CRANES, A-FRAME, 10 TON AND UNDER $42.14 1T 5D 8L
CRANES,A-FRAME,OVER10TON $44.50 1T 5D 8L
CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $47.09 1T 5D 8L
ATTACHMENTS
CRANES, OVERHEAD, BRIDGE TYPE ( 20 - 44 TONS) $44.92 1T 5D 8L
CRANES, OVERHEAD, BRIDGE TYPE ( 45 - 99 TONS) $45.41 1T 5D 8L
CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) $45.96 1T 5D 8L
CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM $45.96 1T 5D 8L
CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM $46.53 1T 5D 8L
CRUSHERS $44.92 1T 5D 8L
DECK ENGINEERIDECK WINCHES (POWER) $44.92 1T 5D 8L
DERRICK, BUILDING $45.41 1T 5D 8L
DOZERS, D-9 & UNDER $44.50 1T 5D 8L
DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT $44.50 1T 5D 8L
DRILLING MACHINE $44.92 1T 5D 8L
ELEVATOR AND MANLlFT, PERMANENT AND SHAFT-TYPE $42.14 1T 5D 8L
EQUIPMENT SERVICE ENGINEER (OILER) $44.50 1T 5D 8L
FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP $44.92 1T 5D 8L
FORK LIFTS, (3000 LBS AND OVER) $44.50 1T 5D 8L
FORK LIFTS, (UNDER 3000 LBS) $42.14 1T 5D 8L
GRADE ENGINEER $44.50 1T 5D 8L
GRADECHECKER AND STAKE MAN $42.14 1T 5D 8L
GUARDRAIL PUNCH $44.92 1T 5D 8L
HOISTS, OUTSIDE (ELEVATORS AND MANLlFTS), AIR TUGGERS $44.50 1T 5D 8L
HORIZONTAUDIRECTIONAL DRILL LOCATOR $44.50 1T 5D 8L
HORIZONTAUDIRECTIONAL DRILL OPERATOR $44.92 1T 5D 8L
HYDRALlFTS/BOOM TRUCKS (10 TON & UNDER) $42.14 1T 5D 8L
HYDRALlFTS/BOOM TRUCKS (OVER 10 TON) $44.50 1T 5D 8L
LOADERS, OVERHEAD (6 YD UP TO 8 YD) $45.41 1T 5D 8L
LOADERS, OVERHEAD (8 YD & OVER) $45.96 1T 5D 8L
LOADERS, OVERHEAD (UNDER 6 YD), PLANT FEED $44.92 1T 5D 8L
LOCOMOTIVES, ALL $44.92 1T 5D 8L
MECHANICS, ALL $45.41 1T 5D 8L
MIXERS, ASPHALT PLANT $44.92 1T 5D 8L
MOTOR PATROL GRADER (FINISHING) $44.92 1T 5D 8L
MOTOR PATROL GRADER (NON-FINISHING) $44.50 1T 5D 8L
MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD $45.41 1T 5D 8L
OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $42.14 1T 5D 8L
OPERATOR
PAVEMENT BREAKER $42.14 1T 5D 8L
PILEDRIVER (OTHER THAN CRANE MOUNT) $44.92 1T 5D 8L
PLANT OILER (ASPHALT, CRUSHER) $44.50 1T 5D 8L
POSTHOLE DIGGER, MECHANICAL $42.14 1T 5D 8L
POWER PLANT $42.14 1T 5D 8L
PUMPS, WATER $42.14 1T 5D 8L
QUAD 9, D-10, AND HD-41 $45.41 1T 5D 8L
Page 6
KITSAP COUNTY
Effective 03-02-08
**********************************************************************************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $45.41 1T 5D 8L
EQUIP
RIGGER AND BELLMAN $42.14 1T 5D 8L
ROLLAGON $45.41 1T 5D 8L
ROLLER, OTHER THAN PLANT ROAD MIX $42.14 1T 5D 8L
ROLLERS, PLANTMIX OR MUL TILlFT MATERIALS $44.50 1T 5D 8L
ROTO-MILL, ROTO-GRINDER $44.92 1T 5D 8L
SAWS, CONCRETE $44.50 1T 5D 8L
SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING $44.92 1T 5D 8L
OFF-ROAD EQUIPMENT ( UNDER 45 YD)
SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING $45.41 1T 5D 8L
OFF-ROAD EQUIPMENT (45 YD AND OVER)
SCRAPERS, CONCRETE AND CARRY ALL $44.50 1T 5D 8L
SCREED MAN $44.92 1T 5D 8L
SHOTCRETE GUNITE $42.14 1T 5D 8L
SLlPFORM PAVERS $45.41 1T 5D 8L
SPREADER, TOPSIDE OPERATOR - BLAW KNOX $44.92 1T 5D 8L
SUBGRADE TRIMMER $44.92 1T 5D 8L
TOWER BUCKET ELEVATORS $44.50 1T 5D 8L
TRACTORS, (75 HP & UNDER) $44.50 1T 5D 8L
TRACTORS, (OVER 75 HP) $44.92 1T 5D 8L
TRANSFER MATERIAL SERVICE MACHINE $44.92 1T 5D 8L
TRANSPORTERS, ALL TRACK OR TRUCK TYPE $45.41 1T 5D 8L
TRENCHING MACHINES $44.50 1T 5D 8L
TRUCK CRANE OILER/DRIVER (UNDER 100 TON) $44.50 1T 5D 8L
TRUCK CRANE OILER/DRIVER (100 TON & OVER) $44.92 1T 5D 8L
TRUCK MOUNT PORTABLE CONVEYER $44.92 1T 5D 8L
WHEEL TRACTORS,FARMALL TYPE $42.14 1T 5D 8L
YO YO PAY DOZER $44.92 1T 5D 8L
POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER
(SEE POWER EQUIPMENT OPERATORS)
POWER LINE CLEARANCE TREE TRIMMERS
JOURNEY LEVEL IN CHARGE $37.61 4A 5A
SPRAY PERSON $35.73 4A 5A
TREE EQUIPMENT OPERATOR $36.19 4A 5A
TREE TRIMMER $33.68 4A 5A
TREE TRIMMER GROUNDPERSON $25.43 4A 5A
REFRIGERATION & AIR CONDITIONING MECHANICS
MECHANIC $50.92 1G 5A
RESIDENTIAL BRICK & MARBLE MASONS
JOURNEY LEVEL $17.04
RESIDENTIAL CARPENTERS
JOURNEY LEVEL $20.00
RESIDENTIAL CEMENT MASONS
JOURNEY LEVEL $30.87
RESIDENTIAL DRYWALL TAPERS
JOURNEY LEVEL $20.00
RESIDENTIAL ELECTRICIANS
JOURNEY LEVEL $14.00
RESIDENTIAL GLAZIERS
J6URNEYLEVEL $31.99 1H 5G
RESIDENTIAL INSULATION APPLICATORS
JOURNEY LEVEL $13.96
Page 7
KITSAP COUNTY
Effective 03-02-08
**********************************************************************************************************
Classification
PREVAILING
WAGE
(See Benefit Code Key)
Over
Time Holiday Note
Code Code Code
RESIDENTIAL LABORERS
JOURNEY LEVEL
RESIDENTIAL PAINTERS
JOURNEY LEVEL
RESIDENTIAL PLUMBERS & PIPEFITTERS
JOURNEY LEVEL
RESIDENTIAL SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP)
RESIDENTIAL SOFT FLOOR LAYERS
JOURNEY LEVEL
RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEY LEVEL
RESIDENTIAL TERRAZZOfTILE FINISHERS
JOURNEY LEVEL
ROOFERS
JOURNEY LEVEL
USING IRRITABLE BITUMINOUS MATERIALS
SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP)
SHIPBUILDING & SHIP REPAIR
CARPENTER
ELECTRICIAN
HEAT & FROST INSULATOR
LABORER
MACHINIST
OPERATOR
PA!NTER
PIPEFITTER
RIGGER
SHEET METAL
SHIPFITTER
WELDER/BURNER
SIGN MAKERS & INSTALLERS (ELECTRICAL)
JOURNEY LEVEL
SIGN MAKERS & INSTALLERS (NON-ELECTRICAL)
JOURNEY LEVEL
SOFT FLOOR LAYERS
JOURNEY LEVEL
SOLAR CONTROLS FOR WINDOWS
JOURNEY LEVEL
SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEY LEVEL
STAGE RIGGING MECHANICS (NON STRUCTURAL)
JOURNEY LEVEL
SURVEYORS
CHAIN PERSON
INSTRUMENT PERSON
PARTY CHIEF
TELECOMMUNICATION TECHNICIANS
TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL
TELEPHONE LINE CONSTRUCTION - OUTSIDE
CABLE SPLICER
. $10.04
$16.21
$21.11
$33.04
1E
6L
$36.08
1B
5A
$31.01
1B
5C
$30.26
$36.78
$39.78
1R 5A
1R 5A
1E 6L
1B 6W
1B 6W
1S 5J
1
1B 6W
1B 6W
1
1B 6W
1B 6W
1
1B 6W
1B 6W
$51.97
$19.29
$25.53
$46.59
$19.64
$19.29
$19.44
$22.24
$19.29
$19.29
$22.21
$19.29
$19.29
$20.58
$9.27
$36.08
1B
5A
$10.31
1B
50
$55.64
1X
5C
$13.23
$9.35
$11.40
$13.40
$32.34
1E
5A
$30.66
2B
5A
Page 8
KITSAP COUNTY
Effective 03-02-08
**********************************************************************************************************
Classification
HOLE DIGGER/GROUND PERSON
INSTALLER (REPAIRER)
JOURNEY LEVEL TELEPHONE L1NEPERSON
SPECIAL APPARATUS INSTALLER I
SPECIAL APPARATUS INSTALLER II
TELEPHONE EQUIPMENT OPERATOR (HEAVY)
TELEPHONE EQUIPMENT OPERATOR (LIGHT)
TELEVISION GROUND PERSON
TELEVISION L1NEPERSONIINSTALLER
TELEVISION SYSTEM TECHNICIAN
TELEVISION TECHNICIAN
TREE TRIMMER
TERRAZZO WORKERS & TILE SETTERS
JOURNEY LEVEL
TILE, MARBLE & TERRAZZO FINISHERS
FINISHER
TRAFFIC CONTROL STRIPERS
JOURNEY LEVEL
TRUCK DRIVERS
ASPHALT MIX (TO 16 YARDS)
ASPHALT MIX (OVER 16 YARDS)
DUMP TRUCK
DUMP TRUCK & TRAILER
OTHER TRUCKS
TRANSIT MIXER
WELL DRILLERS & IRRIGATION PUMP INSTALLERS
IRRIGATION PUMP INSTALLER
OILER
WELL DRILLER
Page 9
PREVAILING
WAGE
$17.19
$29.41
$28.53
$30.66
$30.05
$30.66
$28.53
$16.31
$21.68
$35.78
$23.19
$28.53
$41.96
$12.00
$36.40
$41.19
$41.90
$19.60
$19.60
$18.37
$20.79
$13.17
$14.08
$14.40
(See Benefit Code Key)
Over
Time Holiday Note
Code Code Code
2B 5A
2B 5A
2B 5A
2B 5A
2B 5A
2B 5A
2B 5A
2B 5A
2B 5A
2B 5A
2B 5A
2B 5A
1M 5A
1K 5A
1T 5D 8L
1T 5D 8L
1
1
1
1
APPENDIX B
MECHANICAL PLAN
z -.;;z q, c:z
SCALE:
1"=~
5D'
,~-..
( 2 \-"
,.-.../ .......,"-'.....
/-:;L-.. -',,-
\..::./ "'-""'~'"
''',
(~)._/
08-1
WET WELL
;:4--
Al/~r
":U~l<
''''~
I
-L
f'~
~)l~
\ ~'''''
\ ' '.
\ '",
~!-
/,/''''
,'- - -- - ----1
.~!Di
~ -
,
.,''----
VERTIC?L LADDER
TO MEZZ.^NINE
30x.30 ACCESS
j-IATCH
('-'\
\. 2 '----.
/'-:~ =--' "-.",.
\.~.J "fl" ,
r--,--' -~~_L _1_ _ VALVE_
~~L.". ; ! ROOM
r-- " I
(8)-, ~ ,
'-- ""- !
"'m
j
~I
::l:;2
0...0
:;20
00:::
0:::
i.J..
~"-'II
~It' ~
^
~ (9)
C~~:, /";'/ (1"4)
\ /~
,i /'
-m"
('::\
u,
~ f
~/,,--..,
,/
/
(::.s\i':.) (D
\..-~
{ 'f !~j \1
(20)
,?,_J
;'
I
14" TO BE ABANDONED-
_C~~__=-:.=~~__-- 7'
Q----------_ --.1'-
EXISTING 14" Cf
FORCE SEWER
MATERIAL LIST
ITEMiI
QTY
DIA.
DESCRIPTION
COMMENTS
SPIRAL
STAIRCASE-\
\
\
~",
( .....---'-..., \
(' ...'/'
~'-..--../"~~i '\
'--}K-." I
\2L\J
miCT
./
/ ....<::7
~"'"
0<V~
// <:)
/ <o<V
/ ",a
/ f...,-<-
// ~C:J
. v~
,/ /
/ rvQ;-
/<;f
C;
CJ<V
Oq::.
<(
[I.<V
-<- <:)
"
/ ",'1.-
/.~\
..;;;.V
1 3 B 90' Basc Bend (FL) 1501bs
2 3 .-"--. __~'ing Che<:k Ynlvc (F~1-Q.L1.l5ide II'ciJllll & le~:<:~, .
3 3 8 K.11ji~ Gate (fL) Trueline, Bi-direc. RS. 316 SS body
4 3 R Tee (M))
5 3 8 ...P-'"Long Spool (FL x PE)
6 I B Plug (M])
7 I B Spool 18', Cllllo Length (PE)
R 5 R Solid Sleeve Shon (Ml)
9 (. R K' Spool (FL x PEj
10 I 1I Spool I' LcngUl (Fl.)
II 1 B Gllle Vai\'c (M])
12 I 8 Gate Vah'c (FL)
D .1_____ B___I~e (!:.!:L.. _________ ______..._______
14 I B 90' Bcnd (Ml)
15 I 8 Blind Flange (FL)
16 I 8 x 12 Reducer (FL)
17 I 12 Spool J' Lellglh (FL:'t PEl
18 I 12 45' Bend (MJ)
19 12 I.IOPE Pipe
20 I 12 Spool I" (FL x PEl
2 I I 12 x 14 Reducer (FL)
22 I 12 90'Bcnd (Ml)
D I 1.1 <}O'Bend (Ml)
24 I 14 Adapter (FL x IVIJ)
25 1 12 Gnskct & Bulls Re.u,e cxiSliug Blind Flange.
----.~~~dSlcc':~(Mj)..-.------.
.1 12 22 ] /l'Bend (Ml) Extra Fittings
) 14 AdaplcdFI, I\[J) ..___
~E A!!.(~!~ngs (C~ccPt...:.!~hCS).'~L~_l2ipc-,u~lil.!.rn.lIC~_L:!I_':(1.: .. .____~. ...... ......_.___
! ., All pipe should be Clnss 53 Duclile Iron
l~-;;';
--