HomeMy WebLinkAbout4748 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4748 PEASE & SONS INC OB-1 Pump Station & Force Main Repair Engineering LEG 12-1 08/18/2008 09/30/2008 02/15/2011 01/01/2011 Change Order #1-2/09 Washington State ,,",'.,' : 'i Department of Revenue PO Box 47474 Olympia, WA 98504-7474 278040964 Certificate of Payment of State Excise Taxes by Public Works Contractor PEASE & SONS INC PO BOX 44100 TACOMA WA 98444 0100 CITY OF BREMER TON PUBLIC WORKS BILL DAVIS 3027 OLYMPUS DR __~._____________~___________________________________.____~___ ~ _ __m___ ___ __ __ ~_____ ____ _ ______________ ,_____________ __ BREMERTON WA 98310 4799 " We hereby certify that taxes, increases and pynalties due or to become due frol11 the above-named contractor under Chapter 180, Laws of 1935, as'amended, with respect to the following public works contract: CITY OF BREMERTON PUBLIC WORKS 5075 & 5083, SEWAGE PUMP STA OB together with all other taxes, increases and penalties duefrom such contractor, have been paid in full or that they are, in the Department's opinion, readily collectible without, recourse to the state's lien on the retained percentage. This certificate is issued pursuant to the provision of Chapter 60.28 Revised Code of Washington for the sole purpose of informing the state, county, or municipal officer charged with the duty of disbursing or authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases the state's lien on the retained percentage provided by this Chapter for excise taxes due from said contractor. This certificate does not release said contractor from liability for additional tax that may be later determined to be due with respect to the above-mentioned contract or other activities. Dated 5. J..f -crt at Olympia, Washington, State of Washington Department of Revenue Jc1'fV) . L--~ D . Certifying Officer ". '. For tax assistance, visit dor.wa.gov or call 1-800-647-7706. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 705-6715. Teletype (TTY) users may call 1-800-451-7985. '. REV 310028 (10-01-02) ACCEPTANCE OF COMPENSATION & RELEASE OF ALL CLAIMS City of Bremerton - Sewage Pump Station OB-l and Force Main Repair City Project #5075/5083 Notice to Proceed date: Substantial Completion date: Final Completion date: August 18, 2008 October 14,2008 October 21,2008 Pease & Sons, Inc hereby indicates agreement with, and acceptance of, the final Contract Payment of $160,309.75, total retainage of $12,736.96, the total Contract Price of $276,646.71, including Washington State sales and/or use taxes, and the final Contract Time of 64 calendar days, as full and final compensation for all Wark performed in connection with Contract Numbers 5075 and 5083, and does hereby release the City of Bremerton from all claims, liability, demands, damages and actions of any kind ~ whatsoever, arising from performance of that Contract. "'T"'~ iIoS'l..~A.~\i;i" ..~ "",,,,,~~t. ::'e;1Z?- vt Date: ~ / tf'ItJ 9 Title: I!,'(['L 1'Jr-:eJ.i~i ytv.C-f- Certificate of Notarv Subscribed and s\<yom to befote me this ~ day of ~'.1 ~e_w~ ,20_0 '1. NOTARIZE HERE ,i ~ 545 5th Street. P.O. Box 259 Bremerton, Washington 98337 (360) 377-3711 1-888-377-3711 Fed.I.D. # 31-1260530 tLUNG'.PERfOD->1:. J';"~~ ,'C.'> 'C'\VADVERTISE Ct:IENT. AME',>,';~"'" .-, 21.;;'., ..GWRRENl"NEliAMOUNTD E;. \DVERTISING INVOICE and STATEMENT I'.,' c, PAGE#.;" '''5 'c' >.;.>< '1BllftING';DATE'.<;;,:ri:<;' 8 '",,"~1;,~:,~~~:""J~,>;, ,{,~, ;"~~:,.',I~;f\;:,.\;'.~!J~ Blt&EU.>ACCOtJN:r\NAMc:AND:AOOR,ESS.~0i;)>;~t>t>:; ;X~,';~~"-y, "~::;;'.f\,~:,;;\t 9 ;,[,;.;.., '," ..2,':...;",;;.;".;c~;~-;,>" 'REMI'TTANCEADORgSS;"'~.. Go:' ;., .;' . "'.:.2"... 1 04/12/09 CITY OF BREMERTON DEPT OF PUBLIC KITSAP SUN ..., . "" '. :'BILt:ED.AGC0UNT NUMBEFl '-~.i,:, '':';'''' ~,~ CITY OF BREMERTON DEPT OF PUBLIC PO BOX 34688 3027 OLYMPUS DR SEATTLE, WA 98124-1688 15554 BREMERTON WA . 98310 . ,-: :';,;,' .;ADVERTISERlCUENT.NUMBER ..: . . @ Project # 5tJ 8.3 '0 Initials - Date Ok'd " 020054509700000066515 ,,' 04/11 246634 04/11 NOTICE OF COMPLETION 3310 20085287 BILL DAVIS 2x14 2 66.51 iii Kits~~~8un __.__.._n_.~~ 'kits~ps'-;;';~~ . ','~ ,< \ :~JNVOICENUMBER < ';',,'1 545 5th Street. P.O. Box 259 Bremerton, Washington 98337 (360) 377-3711 1-888-377-3711 Fed. 1.0. # 31-1260530 66.51 All accounts are due upon receipt. ALL MAJOR CREDIT CARDS ACCEPTED 545097 04/10/09 - 04/12/09 BilLING INQUIRIES: (360) 792-3333 .\..,. .-: -~ ;. AFFIDAVIT OF PUBLICATION Account # 15554 AD# 246634 STATE OF WASHINGTON COUNTY OF KITSAP I, Laura Wessels, being first duly sworn on oath, deposes and says: That she is now, and at all times embraced in the publication herein mentioned was the principal clerk of the printers and publishers of KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court of the County of Kitsap, in which County it is published and is now and has been for more than six months prior to the date of the publication hereinafter referred to, published in the English language continually as a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County, Washington and is now and during all of said time, was printed in an office maintained in the aforesaid place of publication of said newspaper; that the following is a true text of a legal advertisement as it was published in regular issues (and not in supplement form) of said newspaper on the following date, to wit: April 11, 2009 that such newspaper was regularly distributed to its subscribers during all of said period. That the full amount of the fee charged for the foregoing publication is the sum of $66.51. The amount has not been paid in full. L:-<AaAj~ (Signature ofprincipal Clerk) Subscribed and sworn to before me this day of April 28, 2009. ~",""III"",,1. ~,,'I/ ) ~ s~ 1//1, , ..........,.~ ~+& ~# ....~..IID;:...~"'t, I .O~ 1~'~\ .: ~rt.,... 1 . ....... r a . . ?) i.~\~ ZIe I ,c-:.!t l 't...~.~!..~ If,,tA'HtIl'1 ~ l"'"IIUtl""'''' ~ 1,1}/YlAA, Notary Public in and for the State of Washington, Kitsap County. 1 NOTICE OF COMPLETION Notice of Completion has been issued by the City of Bremerton to Pease & Sons, Inc. for the contract Sewage Pump Station OB-1 and Force Main Repair. Any parties having a claim for material, labor or damages related to this Contract have forty-five (45) days from the date of first publication of this notice to file a claim. Carol Etgen City Clerk 345 6th Street Bremerton, Washington 98337 April 11, 2009.............................AD #20085287 -- ~ Emp~(I)'yrlr1e!i'wt Security Department WASHihlGTON ST/\TE CONTRACTOR: PEASE & SONS INC PO BOX 44100 TACOMA, W A 98444 ) CERTIFiCATE OF ) PA YIVIENT OF CONTRIBUTIONS ) PENALTms AND INTEREST ON ) PUBLIC WORKS CONTRACT ES Ft€J~,rence No. 251924-004 TO: CITY OF BREMIERTON - BILL DA VIS 3027 OLYMPUS OR BREMERTON, WA 98310 The Employm~ltt ::~('c!lr~ry !)er~f.tm(~llt herehy ep.rtifies those contributillns, penalties and interest due from the above named contmctor under ~he IE,mployment Security Ad have been paid in full or provided for with respect to the follm,'ing public works contract: 5075 & 5083 The Employment Security Department hereby certifies that it has no claim pursuant to RCW 50.24.130 against the puhlic bL'dy lI<<IE'WJ above for tax attributable to si2rvke performed for said public body by the above named contLlctor r:,n Hit: above described contract Th~ Employment Security Department releases its lien on the rclaiiled perct:Bl",,;;e., which is provided by ReW 60.2~UUO for contributions, penalties and interest due from said contractor. This certificate does not rdell:';,t,;. ~aid wntracwi' from liability for additional contributions, penalties and interest which may be later determined to be due with respect to the above mentioned contract. Dated at OlympLl, Wash:ngt:JfI on April 21,2009. COMMISSNONER OYlVHENT SECURITY DEPARTM T !It Original-Disbursing Officer Duplicate-Employer Triplicate-Central Office Files RECEIVED MAY 062009 EMS 8449 760 R3-98 \ENG\NEERING DIVISION \ -.-.-. Verify Workers' Comp Premium Status - Employer Liability Certificate https://fortress.wa.gov/1ni/crpsi/AcctInfoPrint.aspx? AccountId= 12041... Washington State Department of Labor and Industries Employer Liability Certificate Department of Labor and Industries Employer Liability Certificate Date: 04/08/2009 UBI #: 278 040 964 Legal Business Name: PEASE & SONS INC Account #: 120,413-00 'Doing Business As' Name: PEASE & SONS INC Estimated Workers Reported: Quarter 4 of Year 2008 "51 to 75 Workers" (See Description Below) Workers' Comp Premium Status: Account is current. Firm has voluntarily reported and paid their premiums. Licensed Contractor? Yes License: PEASES*302PO Expire Date: 9/1/2010 Account Representative: TW / COLLEEN NELSON (360)902-4715 - Email: NELS235@lni.wa.gov What does "Estimated Workers Reported" mean? Estimated workers reported represents the number of full time position requiring at least 480 hours of work per calendar quarter. A single 480 hour position may be filled by one person, or several part time workers. Industrial Insurance Information Employers report and pay premiums each quarter based on hours of employee work already performed, and are liable for premiums found later to be due. Industrial insurance accounts have no policy periods, cancellation dates, limitations of coverage or waiver of subrogation (See RCW 51.12.050 and 51.16.190). 10f! 4/8/200910:47 AM CITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: 1 PROJECT NAME: 08-1 Pump Station and Force Main Repair PROJECT NO: 5075 CONTRACTOR: Pease and Sons ORIGINAL CONTRACT AMOUNT: PREVIOUSLY APPROVED CHANGES: 100,000.00 DAYS: 0.00 DAYS: N/A N/A THIS CHANGE: 176,646.70 DAYS: N/A REVISED CONTRACT AMOUNT: 276,646. 70 DAYS: N/A This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. 0 ...... INCREASE IN (DECREASE) IN CONTRACT I'- I'- ...... ...... DESCRIPTION OF CHANGES CONTRACT CONTRACT TIME Q) Q) AMOUNT AMOUNT EXTENSION :i :i c::: c::: ($) ($) (DAYS:) x This was an emergency project that required considerable $176,646.70 N/A coordination amongst several contractors. Additional costs were involved with bypass pumping, sliplining force main under Kitsap Way, and excavating on slope on north side of Kitsap Way. Four (4) Work Change Directives are attached along with spreadsheet showing work hours, equipment and material costs. $176,646.70 (0.00) N/A Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. CONTRACT CHANGE ORDER NO: 1 PROJECT NAME: 08-1 Pump Station and Force Main Repair This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. RECOMMENDED: RECOMMENDED: X ;1~-~ t!. ;Jt~ CITY ENGIN ER JDIRECTOR OF PUBLIC WORKS 2 / ~/(;?'! / / Date ACCEPTED: ~~- \Jf 1jzJ cYf Date APPROVED: Date ATTEST: ~ City Cler Page 2 of2 CITY OF BREMERTON WO~K CHANGE DIRECTIVE (WCD) weD #: .-1 Date: 9/16/08 Sewage Pump Station CW-1 Upgrade Project #: 5075 Contractor: Pease and Sons Notice to Proceed Date: Aug 18, 2008 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Modify 08-1 interior piping as shown on the attached drawing and as directed by City staff. ATTACHMENT(S): Outside force main piping plan If a claim Is made thet the above change(s) have affected Contract Price or Contract Times any claim for a Change Order Is based thereon will involve one or more of the followIng methods of determinIng the effect of the change(s}. The Change Order will be executed In accordance with Section 1-04.4 of the WSDOT Standard Speolflcatlons, or Article 10 of the General CondItions. Method of determining change in Contract Price: Method of determining change In Contract Times: o Contractor's Records o Engineer's Records 0 Unit Price 0 Lump Sum ~ Time & Materials 0 Other: o Other: Letter from pump manufacturer Estimated Increase (decrease) In Contraot Price: Estimated Increase (decrease) In Contract Times: TBD SubstantIal Completion: o days; $ If the ohange Involves an Increase, the estimated amount Is not to be exceeded without further authorization. -."...---\ R~~MEND~D. ( / \.~~' Ready for flnel payment: 0 days; If the change involves an Increase, the estimated tImes are not to be exceeded without further authorizatIon. By: By: t4 AUTHORIZED: .I i -S--D rr Ww.L ;Ur6r~/:" ip OJ 08-1 Pump Stalion fimllll1Sncy Repair PAGE: 1 OF 1 Z"- ~ = SCALE: 1 "= 4-0' 08-1 WET WEll 40 ~ r) ~) r;4.) \ I /'>!-"> ifl I I VERTICAL LADDER TO MEZZANINE (2)-~, .-, '--=-~ '- (Ih"-, ,_/ "'I'r' - VA1'{L (~)-, , - -,- ROOM (Sr- '- I ' 0 "m @~L\ \.,-:;-j ~I :=J:::;; !Lo ~::iO~ '--... ~ --- "- c=_~=-=-=~- -Q-------- MATERIAL LIST OJA DESCRIPTION COMMENTS ITEM # QTY I 3 8 90' Base Bend (FL) 150 lb. 2 3 8 Swing Cbeck Valve (FL) Outside weight & lever. 3 3 8 Knife Gate (FL) Trueline, Bi-diroc, RS, 316 SS body, 4 3 8 Tee (MJ) 5 3 8 12" Long Spool (FL x PEl 6 I 8 Plu' (MJ) 7 I 8 Spool 18', Cut 10 Length (PE) 8 5 8 Solid Sleeve Sbort (MJ) 9 6 8 8' Spool (FL x PEl 10 I 8 Spool I' lengtll (FL) 11 I 8 Gate Valve (MJ) 12 I 8 Gate Valve (FL) 13 I 8 Tee (FL) 14 I 8 90' Bend (MJ) 15 I 8 Bliod Flnnge (FL) 16 I 8x 12 Reducer (FL) 17 I 12 , Spool I' Lengtll (FL x PEl 18 I 12 45' Bend (MJ) 19 4 12 Ductile Iron Pipe J 8' Lengtlls (Mechanical Joint) 20 2 12 Solid Sleeve (MJ) 21 I 12 Spool I' (FL x PEl 22 I 12" 14 Reducer (fL) 23 I 14 45'Bcnd (FL) 24 I 14 Adnpter (FL x MI) Re-use existing Blind Flange. 25 I 12 Gasket & Bolt. <I 12 22 I/Z'Bend (MJ) ("i;xtra fittings :-IOTE: All fitting. (except vnlyos) and pipe n"'-4ll!!'role,c.to,L~l~:___ -- -*AlIPij;e- ~1~o~~ld-b-;CI~~~.5-j ?llCli"l~ 11:~n. . u_ CITY OF BREMERTON WORK CHANGE DIRECTIVE (WeD) Sewage Pump Station CW~1 Upgrade weD#: 2 Date: 9/16/08 Project #: 5075 Contractor: Pease and Sons Notice to Proceed Date: Aug 18, 2008 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Rehabilitate approximately 500 LF of 14" cast iron force main using slipline and open-cut trenching in accordance with the attached plan. Confirm all pipe lengths prior to material purchase. ATTACHMENT(S): If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: D Contractor's Records D Engineer's Records D Unit Price D Lump Sum ~ Time & Materials D Other: D Other: Letter from pump manufacturer Estimated increase (decrease) in Contract Price: Estimated Increase (decrease) in Contract Times: $ TBD Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase. the estimated times are not to be exceeded without further authorization. By: AUTH00M IlG /j f-1l, .. ., .~ CITY 07REMERTON \-/ tJ I ',;,.~ ;; f' 1j (ft.; () r.:; By: RECOMMEND;D: J ~~ p~ P.e;;Pr!- <~ ~,S ~, CONTRACTOR SEWAGE PUMP STATION CW-1 UPGRADE PAGE 1 OF 1 NOTES: ~NTRACTOR SHALL SUPUNE AND REPLACE THE EXISTING 14" CAST IRON FORCE MAIN AS INDICATED ON THIS SHEET. NEW PIPE AND FITTINGS SHALL BE 12" DtA HOPE (SDR 11, OD _ 12.75, FLANGED), UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL PROCURE MATERIALS, CONTRACT PIPE WELDING SERVICES, AND INSTAll HOPE PIPE AND FITTfINGS. CONTRACTOR SHAll PROVIDE TRAFFIC CONTROL FOR WORK IN THE RIGHT-OF-WAY. P<c/"yUl?mMI'Jt FoAH 2. FOR SlIPlINING, FORCE MAIN INTERIOR SHAll BE CLEANED ONLY IF NECESSARY. PLACE FI:6WJ!;BtE GROUT AT PIPE ENDS TO SEAL ENDS AND MINIMIZE PIPE MOVEMENT. INSTAll GROUT 5 TO 10' WITHIN PIPE. 3. EXPOSE AND REMOVE 22-1/2' AND 45' BENDS, AND SPOOL AT BASE OF SLOPE BEFORE SlIPUNING. CONFIRM THAT SECTION 4 CAN BE SUPUNED FROM WITHIN SHOULDER OF KITSAP WAY. 4. DEMOLISH PORTION OF THRUST BLOCK TO EXPOSE AND REMOVE 45' BEND. CUT OUT EX. 14" PIPE IN ORDER TO FACILITATE SUPLINING. INSTALL NEW 45' BEND AFTER SUPlINING. RESTRAIN TO EX. BLOCK BY DRILLING AND INSTALLING FOUR (4) t' THREADED RODS. FORM AND POUR CONCRETE BLOCK OVER BEND AND EX. BLOCK. 5. AT BASE OF SLOPE, RESTRAIN NEW 90 BEND TO EXISTING THRUST BLOCK. DRILL AND INSTALL TWO EXPOXY ANCHORS (i" THREADED ROD) AND POUR CONCRffi BETWEEN NEW BEND AND EX. THRUST BLOCK. REMOVE MISC. CONCRETE BLOCKS AND FILL TO LAY PIPE FROM NEW BEND TO PUMP STATION. 6. ':1~E UP REMAINING PIPE FROM THE 90 . BEND TO THE PUMP STATION USING HOPE PIPE AND FITTINGS. THE CONTRACTOR SHAll FIELD DETERMINE PIPE LENGTH AND REQUIRED FITTINGS, ..~~lqllh:"",," l~\ "t.i.~ilf;:'" l~! ~-' \~~ \ .,.1j;. J NO. \~~..t." I . ......:;;.' I t=-urnson..11IC1 '" .... t1> .. ~ I"l ... ill p., ~ (,) REVISIONS """"""'" .- ~ _-vi SOlO ~Et1l0N J OYSTER SAY AVE. N KITSAP WAY ! "lOP or SUlPE ElIKE: w4E; S10twAU'l I SmlOfl ~ I SEcnou 1 (REPLACE PiPE, U!;:E ItS .JIICKING: "IT) PIl'ELINE ImllAUILATION SCHEDULE S.<llon Es~ R.h.blnt.lIon From To Comm""t L.nglh M.lhod (field tonnnu 100 Sliplin, a 22-112 CUI I:ndufpipc in lnsLilU fiUing5 10 mllkc conneclions 45 indicated IlD beud former ClPP pil plan. 'oulh 50 O",,"CUI Ex 22-1/2 Ex 22.]/2 bend Replnee both Z!-J/2 b.nd. with HDPE 22.1/2 bends beod flanned. Useexctlv!J.ticn rorsli line "ndcin it 300 Sliplin.c Ex 22-1/2 Ex 45 d.g bend i. Expo,e .ad "'mOVe bolh 22.1/2 nnd 45 degr.. deg bend Ibrust block bl:nds befcre :sJiplining north 60 Slipline Ex. 45 deg &.~ 90 b~nd I1t bottom ~o'c p.nd n:n~ove 45 bend in thrust blCJ<::k lI.od bend in c( slope. rtear pump SpoOl.a1 bniciJf~lDpc bl:fore dipIinmg. TIlb b a Ihnat block $tl1tion ~L=eJl Iropt:. Confirm thnl.sliplining elm be stl1ced and done from lihoulder DrKilsa W:J . bAtt BY r r--"""'\ w.o~IU...th.U.G:,l.U[ FIIOTSCALtAttXJ1ll1Gl.'I .... ."'" CITY OF BREMERTON DEPARTMENT OF PUBLIC WORKS & UTILmES ENGINEERING DIVISION JT j~ H/A SCALE ~Em.H/" CUICH 1'1'.; w.o liI;t.$H. p,t. f.Hi'PI ~l.\,lt'M a'tO(ID .~ lIl1' w,wL "L , .lD1.r.1 !loAn:: 1,10.1 tlfr.,I.llIn~ Ir',[l 0A1t IflM MA-T8!-IPrW bf.JD t-F /f'bP";; 5ZJIZI! IPS. . r 9< 2. Z 1(1- tv..~ 2 X <I s~ b-e.r1J 1 )< <j 0 Ia-e""o . 12. +' /ttJjM LvNFlli!('ol '....teT-1-/-cD i () I=- t..;..tJ STeu c:ncfl..] .0..... sT^lD'~ w~ '" RDN1W^Y CJ :DPE NlD BmDS ml/ SEE 1I00E G. 11011 I OB,1 FORCE MAIN REPAIR SLlPLlNE AND TRENCHING ELEVATION SCHEMATIC AND NOTES CI4:fl G1 ~ < 1 "' . CITY OF BREMERTON WORK CHANGE DIRECTIVE (WCD) weD #: 3 Date: 9/16/08 Sewage Pump Station-evprOR-j q' ff;v~ Hcun UpgfaEie- IkpB...lf Project #: 5075 Contractor: Pease and Sons Notice to Proceed Date: Aug 18, 2008 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOllOWING CHANGE(S): Install ceiling pipe hanger flange, adjustable clevis hangers for 8" ductile iron pipe, and 1/2-inch 304 58 threaded rod in order to provide vertical support of pipe manifold at 5 locations. Reuse existing ceiling pipe hanger flanges if available. Threaded rod or clevis hanger shall be new products. Use Megalug or equal to restrain all mechanical joints connections. Threaded rod between joints is NOT required for additional restraint, unless otherwise noted. ATTACHMENT(S): Plan showing location of hangers; detail of ceiling flange, detail of clevis hanger If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will Involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed In accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change In Contract Times: D Contractors Records D Engineer's Records D Unit price D Lump Sum f8] Time & Materials D Other: D Other: Letter from pump manufacturer Estimated increase (decrease) In Contract Price: Estimated increase (decrease) in Contract Times: $ TBD Substantial Completion: o days; If the change involves an Increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment 0 days; If the change Involves an Increase, the estimated times are not to be exceeded without further authorization. AL1THORIZEP,/ . ~ ' h1ll< 1/1r CITY OF BREMERTON By: 08-1 Pump Stetion Emergency Repair PAGE 10F4 ]:ns~ alliJ tip-€.. htl-Yl 5 ex- -fIClh~ {: c.S2mis ~"-~. Sse.- ~ ~voilid- &..d-zU I s ~ 1/2... 3o/{ ss -j+.~ s- \ I Yb~ ,." (Pi. /<0 CA--1I'6YtS ) s~ VALVE ROm;:r SCALE: 1 .. = -4a""" sn' ~t :J:a 0..0 ~o 01:1: If . ~ :z~ 08-1 WET WELL ~ ;0,e \'/ -m I It (9) ,~ I I I ~ l--@) ~ / I .. VERTICAL LADDER / TO MEZZANI~.IE..... \ .. " \.30lC.30 ACCESS !-IATCH Anvil Co:mpany Iofl http://www.anvilintl.comlps_ hnnger/index.pbp?CAT=3&FIG=590&... ~~\~IL: ~.....~~:~ Products &: Services ': _ __ ,-' - . ,~:- HI-l,;l~; - :~\~.;ili~~:71' . ::tITil'-fl 'r f.l :;;-:-l.ljl,l. .1..~ .'~ .~~{,~,;~.tl ri-ll:' :\ji~Jr.:~I~I; ~. 6~~~-l-~~1j-Li4~~. ..-----.--.--.---. -I PlaN.. L_____J FInd Fl9Unl: 590 Adjl1lltoblll CIIlI/Is for DucUle or Csot Iran PIps ISldrmltill nl,INIU r:dn'" tnl Fig. 590 SIZll Ranlle: 4' UlfQuah 24' ducae 01 wt 1.0Il plpa Malarial: en/bon &It~1 Flnllll: 0 1''f;1ll 011:1 Glll'alllzcd Service: Retonlmended larllla sUlPWillllol dudija 1rlll1 or GISt 1rlll1 pipe. .Approvalc Clllnpllas \1illl Feder-II Spadli:allUII A.A-! 1921\ (tYpal/ 'JNl.N.JTI.E (/"ypcI1Bnd MS5-SP-&D IType 1/. In&laUalloD: IbJIgUllld IIUl abm clll'liS must bc liabIDlllld Mi:llrellt 10 assUI! pruperhanocr perltttnumtlL Adlmmenl: Verlial udjur;tme!ll vdthoul remolllng pipe mar be JI1llde ',em 11~,'lIlloUDl1 m",'. varying I'lith Iheslzul UI8 clavls. Wuhlen upper nut aller ad)Ullm!nL Ordllrlng: Spetiryplpo Illl!, llgutlllllmbel. nama and "nlslL Adjustable ClevIs for Ductile or Cast Iron PIpe ....~-... :r'7: Fle-illOl LaUdllllbs) -Walghl (Ibs)' DfmcnlllOrll (In) I I Rod D.IJC.L MIIX Laad W Ighl D.uc.l. SI:e I B I C I ElF Pipe SIze a Pfpa o.D. A I U30 I 1.G4 I 5 .,~j5lf.u I B'I.. i W, , I" ~-'I'''I ~ ! 1.940 1 us l~ 'I, 7V, 1 10'/1, ; 5"/1, !__ ~--1~i 6.10 1~_I__~ 13)~I~_~.~~_L~ 10 I, 3.6DD " 9.13 IIVl 10'" ! 15"111', 8'1J 1 2'/to '11 . . ..--..!!---11....?~~.~~..-.L~:6~... ..._l~~?_._. [....-".J)!Y.!.~11.!~~-~L!n.~~~..L..~~. 14 ~.2DO i 10.04 U'I. I 13VI . 20'A I 11'1.. i PI" III : 4.UO i 24.52 I I7lf. I ~122t"',. J..~I 2'''~ 18 ! 4.800 12MB! 2D __..___~L 20'1. ! ISV" _I : 20 ! 4.80U f 46.24 I 22.... I hlev, ! U'/II 1 16111 ! 3"/11 I 2~ i 4.80a i S7.10 20;;;-- I'll 20v..! 33'1. 1 1D'II i Anvllltllamilllona.) It!: n .tIllblillilDry iiI MttnllDr WOlaJ P.c:d\JtL!lii tm::. ~ C200D. AnvlU1l1ltlnallortal Seerch 9/16/2008 2:48 PM Anvil Company 10ft @"'ANVll; f yrm,......nNATta..."'*" 1 ..;g...~UonI n.KL=I http://www.anvilintLcomlps _ hnnger/index.pbp?CAT~&FIG"" 153&... PlllNo: r--.-."........ '''''''1 And _~.._...__......_. I :~~ '- ~ .... -- ~ _: ,<-;;'_ = -- : "I'!l1 - :.'h:ln; "i;"III~ -'j lj\r~III-_li:~- .~ ':='~\II-,.l '--- :;: ~\ l~l,r'~;;l-l'i:~,-\ ~ ;t~ i~l::l~': . L\;+-~i,~i.~,lr,I\.J Pt.oducts & Set"vices Figure: 153 Pipe Hanger Flange ISlIbrnlSt.,1 Shoo" k!!!!!!.!!L Fig, 153 Pipe Hanger Flange SLzB Range: W UuuuOh ;-4" Malerlel: MiI~bla bon F1nlsll: C P'31n SBrvles: R=imml!lldad lor 51lSpall31cm III plpo Ul1el1 or coIXMIllOJn J.MI CeirlllQ5. Approvals: UL ute LlsladJlld FIA IIpplllVad. InslallBllun: FlllnJlutu WbulI'lO holg. SI'I5 W. 5,1.', and J./>' hne Ihlllo holes. . Foalurs8: · Plovldes wlllc:allllljullmcnl up 10 1", . Gcod appr.mmco. Ordarlng: spccily rod slm. nOu,e numballlld nDI1lIl. Rad Size A Malt Load AIWH IntamzallaltlJ III A IUltI2.ldla:1i" af f.lU1lllpr WAi.r ProclUc!!I 1M. li'SIe ~-~ \J W. ~I'. -Yo' Silt p ~~'----i ~"""r I 1" ' '" C,-'" t' _. .1:"-1 Sct8\!1 ClIClo Dla.-F 2 ~ C~UDtl.IlIMII.l."Ii1/lIlIa/ Search 9/16/20082:43 PM CITY OF BREMERTON WORK CHANGE DIRECTIVE (WCD) Sewage Pump Station ew=4 D~-'\ t1 Hsv-U ~'vl~ tC.~'r weD #: 4 Date: 9/29/08 Project #: 5075 Contractor: Pease and Sons Notice to Proceed Date: Aug 18, 2008 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Install and restrain a" and 12" ductile iron pipe immediately outside station as shown on attached plan sheet. ATTACHMENT(S): Outside force main piping plan If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications. or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: o Contractor's Records o Engineer's Records D Unit Price D Lump Sum ~ Time & Materials D Other: o Other: Letter from pump manufacturer Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ TBD Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: ~~ ~ I CONTRACTOR AUTHORIZED: 1/ ~ ~ CITY OF BREMERTON By: By: 08-1 Pump Station Emergency Repair . PAGE 1 OF4 NOTE: ALL PIPING/FITTINGS SHOWN ARE 12R DIA. 01 MH FRAME AND SOLID LI / 3' W ll: 3' H x 1.5' TI-lICK ~ONCRETETHRUSTBLOCK SEE NOTE A FOR RESTRAINT.. APPROX. 315 FEET FROM GRADE TO CENTERLINE OF ELBOW UNI.FLANGE AND BLIND FLANGE. BOLT TOGETHER WITH T-BOLTS o PlACE "'104" AIJJU"'MU~ MH FRAME RISER SECTIONS GROUND LEVEL TWO {21 t SS RODS FROM UNI-FlANGE TO MJ ELL USE DUC-LUGS SPOOL {PEl, CUT TO LENGTH . TO BRING 6' ABOVE GRADE AS SHOWN (APPROX. 4' LENGTH) [II @ @ Ls'-sO FROM FACE OF WALL TO WYE FLANGE --- BYPASS MH - SECTION DETAIL PIPING OUTSIDE OF STATION WALL - PLAN 08-1 PUMP STATION REPAIR - weD #4 ; MATERIAL KEY AND NOTES ..:...~.I:.:.":::~:@~~I~~9Q.L(fI~'~~);'_c{jiJQ~~~~~1H;:~~~gg~T.g.F.tA~~~::~~.Q~5?;:FR9.~.:vy~t+~.':. '.::,'~:: :.:.' ~ 2 !8" SPOOL (FL), 12" LENGTH ~ .- ........3 ..... /a';-x'12,i-REbDcER -(FLy.-.....-.......-----.-.-...---- .........-....-..---.......-.....-.-........ ..-..... ...... ............... ......-.... .. .._...._,...._._.....I~.._.....__._........". .,......" . .."__n . n .__.._ __ __,m.u_._...... _"__n',u ,.-..... ..........................__.,,_.... .."...._....."........."............ __............ ... __................. ... "...... . : 4 ~ 12" WYE (FL) !-.,......5.....-....i.12i'..GATE...V)i;[\TE"(FLy-...... -"""...---. ..--.--.-....... ...___._.__..._........._........... ""_"'.'.' ............ ..... . .... .............n .. . . :...:..::.::~::=..::..i1?::~:~:Qq~.I~~:~(p.~~.15_QtJQ.:~~f9..~:.:~~~~:!tC..:..:.::===.=...:__~_~=_._...~ .___' .:,. ..:.:::.::.:.....:.:.:....=........ . c........~..__..! .~?::..~..L.?~~.:_~~~.~Jry:I~J..~~.~_Q.~.I~.1!:: .f9.F=!_'!.~!3JJ9~.'=-~~.Q!!Q!'J_~,~..!9.~f-I~l).E:.... _....... ,.. '. ; 8. 112" HOPE (FL), FIELD DETERMINE REQUIRED FITIINGS AND PIPE LENGTHS ... . .' _"m"..'_"~'.''''_M_._"_ ~~, J --. __ . .._................ ....._~........ ...,.". _~~__ ...,~,,~.,'" ,_ ,_.,~,_..__._. '..._.__'_._'_'''h__ _. ,.~..". .. "."..._ ... .~,~.. V"h_'_~'._,~_._ __.__ _.. ... _. _... _.._". 'V"'V"'~'" 'M_'V ,~..~ . A i3' WIDE X 3' DEEP X 1.5' THICK THRUST BLOCK, POURED AROUND FLANGE:"ORILL AND'" i EPOXY EMBED FOUR (4) #6 BENT REBAR INTO WALL, INTO THRUST BLOCK. WALL l.. .lEMBEDMENT DEPTH "" 6". L...........:~.:..::.::Ir~I8:__~9:~gFf~J.if~j~E~__~~9TIq~$.E~QJ.~.4M.~?~RA~~::.$EE.. [).E.f.AI~.:::.."......:.:.,::.:____.__........._ ,...' ..' 9/29/08 WJD CITY OF BREMERTON SEWAGE PUMP STATION OB-1 AND FORCE MAIN REPAIR FINAL COST SUMMARY SHEET Contractor: Notice to Proceed Date: Substantial Completion Date: Pease and Sons August 18,2008 October 14,2008 Date: 11/3/08 Revised 1/27/09 Prepared by WJD, City of Bremerton ""'E::&'!iO~~' ..~ ' . ,,,,~Q{f~T: ..- . ."'3'<-'7 "'.'./.j""",~,,P~'i.-"""; ,"-0;:',"'"';-,,- 7 '+TZU T Labor Rental and Materials Equipment PEASE TOTAL $49,440.65 $21,743.92 $10,139.47 $81,324.04 -~~;rc~"~TTT.:;..:.~~.:~:' ~:~~~\":~ .4. Labor Equipment Materials Rental Equipment SUBTOTAL MARKUP QUIGG TOTAL $17,573.19 $11,536.78 $8,524.47 $30,827.02 $68,461.47 $7,346.15 $75,807.62 'uiiiitFmtQ . .n c" _. T'~' . . ;,.. . ~-"-,,-..,-"'t~-;c Labor Equipment Materials SUBTOTAL MARKUP C.A. GOODMAN TOTAL $22,679.92 $15,529.30 $2,514.38 $40,723.60 $4,572.36 $45,295.95 SERVICE COMPANY SDNSB:-rr l'k'"''\l~~ii' SUBTOTAL SUNBEL T BASED ON INVOICE MARKUP AT 21% SUNBEL T TOTAL $43,232.67 $9,078.86 $52,311.53 SUB GRAND TOTAL (W/O SALES TAX) SALES TAX @ 8.6% GRAND TOTAL DUE $254,739.14 $21,907.57 $276,646.70 CITY OF BREMERTON wjd SEWAGE PUMP STATION OB-1 PUMP STATION AND FORCE MAIN REPAIR 1/29/2009 WAGE RATES SHEET Base ST OT Name Labor Position Wane Loaded Wage Loaded Wage Pease and Sons Larry Boyd Project Super $65.89 $85.00 Ray Parks Project Superintendent $63.31 $81.67 Brian Smith Carpenter Foreman $61 .43 $79.24 $109.45 Justin Rustler Carpenter Apprentice $56.05 $57.27 Scott Grout Laborer $50.45 $65.08 $90.22 Mark/Coordinate Trucking $40.00 Armondo (Laborer) $40.00 Pease Pipinn Kirk Parnham Plumber Supervisor $93.79 Terryl Burton Plumber Foreman $90.85 $124.63 Mike Biles Plumber $82.04 $111.41 Jeff O'Brien Plumber $82.04 $111.41 Shea Budlong Plumber $65.01 Jeff Frazier Plumber Apprentice $65.01 Jeff Emmett Plumber Foreman $87.91 $120.22 Edward Bass Plumber Apprentice $68.40 Quinn Brothers Hans Breivik General Foreman $53.14 $68.55 $93.40 Alice Carlson TCS $37.69 $48.62 $63.25 Alice Carlson Flagger $36.56 $47.16 $61.06 Ashley Beaty Flagger $36.56 $47.16 $61.06 Sherri Davignon Flagger $36.56 $47.16 $61.06 Brad Taylor Truck Driver $24.25 $31.28 $45.68 Brad Taylor Laborer $41.37 $53.37 $70.37 George Middleton Laborer (Teamster) $19.61 $25.30 $0.00 Ron Stiles Laborer (Teamster) $19.61 $25.30 $0.00 C.A. Goodman Herb Anderson Foreman $53.82 $69.43 $95.71 Cecil Goodman Foreman $53.82 $69.43 $95.71 Damon Bush Operator $52.69 $67.97 $93.50 Chris Bunker Operator $42.82 $55.24 $0.00 CITY OF BREMERTON v.jd I I SEWAGE PUMP STATION OB-1 PUMP STATION AND FORCE MAIN REPAIR 1/29/2009 I I r~ '.i..-#;i, ~ <~ Ttt} J.~ wi T" I 'hi ,; I I .I I, I", I T' I, H; : , T l M " ';T,- W Th M T W Th F T Th M .W Th F M;. \\'" F:M T W Th F "M ., M1 <',"-'", II If 11 II II II II II! II II' ~I ;11 I If I II ~ II' ~ II II II II II: II III RT Hours per Loaded : I daily time Wage Rate LABOR {Pease\ S I sheets RT TOTAL Larry Boyd (Project Supenntendent,l 4 ,1* 'h 7 1 ''I'' i 26 $85.00 $2.210.00 Ray Parks Project Foreman) 4 4' 4', .{' 5 4 3 1 1 1 t 3 2' .J 4 2 6' 1 6 6 3 5 1 I 119 $81.67 $9.718.73 Brian Smith (CerPenter Foreman) 8 S" 8 8 6 4 '3 6 S 1 4 5 I 83 $79.24 $6.576.92 Justin Rustler (Carpenter aporenticel . I 16 $57.27 $916.32 Scott Grout Laborer .~ 4 27 $65.08 $1,757.16 Mark/Coordinate Trucking ,. .0 4 $53.29 $213.16 Armando (Laborer : '. 5 13 $<0.00 520.00 TOTAL LABOR PEASE ft. 1 rr*-t ~ 1 3 Z 1 2 . 7 8 10 Kirk Parnham (Pipefitter/Plumber Super) '5 5', A.. 5 3 2.5 1 t 1 ,f? 1 .. 7 .6 59 $93.79 $5.533.61 Terrvl Burton PiDefitterlPlumber Foreman ",.j' .~ ' '" 7 7 7 7 s.s 8 8 6 1 1 '.2 3 3 8 113.5 $90.85 $10.311.48 Terry! Burton (OT) ,W .... 'iJlI, , H . ,1 I 1 $124.63 $124.63 Mike Biles PipefltterfPlumber Journeyman) ,t ~ -.- ,8'.. 3 19 $82.04 $1.558.76 Jeff O'Brien (Pipefitter/Plumber apprentice) .', 8 ;Sf 6 ':n.: 4 41 $82.04 $3,363.64 Shea Budlona (Plumber) WIN> '" ; $65.01 ,. Jeff Frazier (Plumber) 5 ,.3 7.. 8 .8 t 8 3d 82.5 $65.01 $5,363.33 Jeff Emmett Plumber 8 10 $87.91 $879.10 Jeff Emmett 0 n 1 1 $120.22 $120.22 Edward Bass Plumber apprentice * IJ~tkl H'C ;. 4 4 $65.40 $273.60 TOTAL LABOR PP 5 5l ri 11&t'il 10 6 '1i15 17 16 15 9 15 11 17 12 1 1 "111!' 8. ,2 :J 6 24" 6 I :J:J1 $27,528.:J6 TOTAL LABOR PEASE (PP/PS) I $49,440.65 E UIPMENT II 'Will ,.: ., . Pease F-150 Ford 2x4 , ".t:i .."': 4 3 'J? 2 '. 6 3 5' ';3 i ~ 6 104 $10.20 $1,060.80 Pease F-150 Ford 4x4 8 6 .{ 6 ..Ii 4 5 68 $11.35 $771.80 Pease Traffic Control Equipment , 8 $12.00 $96.00 Man Retrieval Equipment/Gas monitor 3 .lJ 3 $52.50 $157.50 Peterbilt Boom truck & 7 8 S 8 77 $66.50 $5.120,50 F--800 Pease Dump Truck tit 8 5 21 $40.20 $844.20 PPI F-150 Ford 2><4 'r+- 5 3 l' 15 $10.20 $153.00 PPI icku 5 ~ o. 15.5 $11.35 $175.93 Subtotal $8,379.73 Markup 21% 0.21 $1,759.74 TOTAL $10,1:J9.47 MATERIAL AND RENTAL EQUIPMENT Subtotal $ 17,970.18 Markup 21% $ 3,773.74 TOTAL $ 21,74:J.92 TOTAL PEASE AND SONS/PEASE PIPING $ 53,795.68 QUIGG BROTHERS COST SPREADSHEET I I I I I I I I I I Work Date Grand Total .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ... .. .. .. ... i~ I- .. .. .. .. ... .. .. .. .. .. Ili~ 0 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. " .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ~ ~ ~ N N N ~ ~ ;;: N N N .. ~ ~ N N 1il ~ ~ ~ ~ ~ ~ N I ~ ~ 0; "5 I! i~ 0; t: a in iD ;:: ~ :2 ~ in ~ ~ a !:! t: ~ a i l: ~ ::l a LABOR l: ~ ~ ~ N ;; ~ !!! l: N ~ ~ ~ !:! ~ ~ ~ ~ ~ ~ ~ &,g Total RT .3~ Total orr .. .. .. 0 .. 0; .. .. .. 0; 0; .. .. .. 0 Hans Breivik 4 5 4 4 3 2 2 2.5 4.5 4.5 1 1.5 1.5 10 :\5 3 3 1 1.5 1.5 1 60.5 $68.55 $ 4,147.31 :),~ 93-AO S 46 to $ 4,194.01 Alice Carbon 9.5 7 8 8.5 2 8 8 5.5 4 10 10 "t:. 10 (1,$ 5 10 7 105.5 $48.62 $ 5.129.42 " 63,25 $ 5.0(;,:)0 $ 5,635.42 Alice Carlson $47.16 $ (11,(16 $ Ashley Beaty 9.5 7 8 8.5 4 10 10 u}; 10 ,.,~ 8.5 7.5 10 7 100 $47.16 $ 4,716.24 61,:5 s (,. Co $ 4,777.30 Shene Davi~non 4 10 10 0/, 10 ~:_& 34 $47.16 $ 1,603.52 (,1.GO S ':. i G,; $ 1,664.58 Brad Taylor 3.5 ,~,5 3.5 $31.28 $ 109.49 '~: S 1.5.68 > 11~~ '2::':; $ 223.69 Brad Taylor 6.5 " 6.5 $53.37 $ 346.89 5 n.37 S ~J5>1 ,e~ $ 698.74 Georae Middleton 6.5 6.5 $25.30 $ 164.43 ~ - $ 164.43 Ron Stiles 8.5 8.5 $25.30 $ 215.02 1 $ 215.02 TOTALS 4 11.5 33 11 14 16 20 10.5 2 2 2.5 12.5 12.5 6.5 1.5 14 40 1 33 2 33 2 9.5 7.5 6.5 22 15 325 $ 16,432.32 $1.140.a7 $17,573.19 Rate EQUIPMENT (unloaded) 2003 Honda Accord 4 5 5 4 3 2 2 2.5 4.5 4.5 1 1.5 1.5 10.5 3 3 1 1.5 1.5 1 62 $ 12.00 $ 744.00 Dump Truck-53-531 10 2 12 $ 78.23 $ 938.76 Tilt Trailer-57-810 8 5 13 $ 13.55 $ 176.15 Cat 325 Excavator 2 3 4 4 13 $ 115.87 $ 1,506.31 Cat 325 Excavator - Stdby 6 5 4 4 19 $ 27.31 $ 518.89 JD 50 Excavator-13-501 8 7 8 8 31 $ 25.01 $ 775.31 Traffic Control Truck 9 7.5 8 8 8 8 5.5 4 10 10.5 10.5 10 7 106 $ 35.08 $ 3,718.48 07 Kenworth Tractor 55-401 6.5 6.5 $ 73.86 $ 480.09 00 55 ton Lowboy 6.5 8.5 15 $ 16.86 $ 252.90 00 kenworth Tractor 53-527 8.5 8.5 $ 49.84 $ 423.64 SUBTOTAL 4 18 48 33.5 24 27 8.5 2 2 2.5 12.5 12.5 6.5 1.5 5.5 20.5 13.5 13.5 1 1.5 12 8 286 $ 9,534.53 MARKUP {21%1 . $ 2,002.25 TOTAL $ 11,536.78 MARKUP MATERIALS 21% I $ 8,524.47 RENTAL EQUIPMENT 21% I $ 30,827.02 I GRAND;TOTAL I I $ 68,461.47 CITY OF BREMERTON wjd, 1/29/2009 I I I SEWAGE PUMP STATION OB.1 PUMP STATION AND FORCE MAIN REPAIR I I I Subcontractor to Quigg: C.A. Goodman = = = = = = = = = = = = = = = = = = = = = = Q Q Q Q Q C Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q 11,~1 Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q N ~ ~ ~ N W WI ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 'Ot II) co co ~J CC) = Q ... N II) co 'Ot II) co G) Q :!!:: ~ !2 t:: !!!! t!! ... ... ... ... ... << ... ~ ~ ~ ~ ~ ~ ~ ~ ~ !2 0 0 0 0 0 00 LABOR co Q Q Q Q Q Q g~ SUM TOTAL = = = = = G) G) G) G) G) ... ... ... ... ... ... ... ... ... ... ... ....:c Herb Anderson Foreman 7.5 8 8 23.5 $69.43 $ 1,631.55 Cecil Goodman Foreman 8 8 8 7 8 5 10 10 10 8.5 9.5 6.5 5 7 7 118 $69.43 $ 8,157.77 Damon Bush Operator 5 9.5 7 8 8 8 8 8 7 8 5 10 10 10 8.5 9.5 6.5 5 7 7 155 $67.97 $ 10,535.37 Cecil Goodman (OT) Foreman C.S 0.5 C.5 1.5 $95.71 $ 143.57 Damon Bush (OT) Operator C.5 0.5 C.5 1.5 $93.50 $ 140.25 Chris Bunker Operator 5 9.5 7 8 8 37.5 $55.24 $ 2,071.42 TOTAL LABOR $22,679.92 EQUIPMENT Subaru Outback 7.5 8 8 23.5 $12.00 $ - 1993 Ford F2504wd 5 9.5 8 8 8 38.5 $17.42 $ 670.67 2000 Ford F-350 8 8 8 7 8 5 10.5 10.5 10.5 8.5 9.5 6.5 5 7 7 119 $25.63 $ 3,049.97 Hitachi EX 135 UR 1998 8 8 4 7 8 5 10.5 10.5 10.5 8.5 . 7 5 3 7 7 109 $83.61 $ 9,113.49 SUBTOTAL I $ 12,834.13 MARKUP I 21% $ 2,695.17 TOTAL EQUIPMENT $ 15,529.30 I MATERIALS I Gallagher Farms on 9/24/08 $ 512.00 Gallagher F arms on 9/30/08 $ 512.00 Gallagher Farms on 10/10/08 $ 30.00 Gallagher Farms on 10/21/08 $ 1,024.00 SUBTOTAL I $ 2,078.00 . MARKUP I 21% $ 436.38 TOTAL MATERIALS $ 2,514.38 I GRAND TOTAL $40,723.60 CITY OF BREMERTON wjd; 1/27/04 SEWAGE PUMP STATION OB-1 PUMP STATION AND FORCE MAIN REPAIR Pease & Sons Materials and Rental Eauipment AMOUNT Bond $1,124.00 Affidavit of Wages $160.00 Evergreen - Core drill pump station $260.00 Evergreen - Sawcut asphalt on road $500.00 Evergreen - Sawcut road $650.00 Fastco - All thread $413.16 Ferguson - extrusion gun rental $1,729.92 Fred Hill - Concrete on 8/25 $333.00 Fred Hill - Concrete on 10/9 $594.00 Fred Hill - Concrete on 10/10 $159.00 Fred Hill - Ecology blocks on 8/21 $323.75 H.D. Fowler - SS Strap for 36" HDPE $106.60 Kistap Lumber - Screws, paint $7.78 NW Wire Rope on 8/19 $192;80 NW Wire Rope on 9/30 $342.04 Honeybucket $237.65 Puget Sound Pipe and Supply $328.66 Demolition disposal $186.95 Star Rentals - Vibratory equipment $469.15 Star Rentals - Generator, pump hose $569.14 Star Rentals - Forklift $3,889.40 Star Rentals - Concrete breaking tools $86.34 Star Rentals - Off-Road Diesel $2,133.56 Star Rentals - Forklift, generator, diesel off-road $1,935.00 Star Rentals - Generator $144.80 Stacy plumbing - clevis hangers $201.49 Shipping $411.32 White Cap - jute mat $101.00 White cap - jute mat $45.00 Misc. $334.67 SUBTOTAL $17,970.18 MARKUP @210.10 $3,773.74 TOTAL $21,743.92 CITY OF BREMERTON wjd, 1/29/2009 SEWAGE PUMP STATION OB-1 PUMP STATION AND FORCE MAIN REPAIR QUIGG BROTHERS RENTAL EQUIPMENT AND MATERIAL INVOICE COST SUMMARY RENTAL EQUIPMENT Item Date Amount All West Underground - Trench Box 8/31/2008 $ 4,525.18 All West Underground - Trench Box 9/23/2008 $ 4,264.54 All West Underground - Trench Box 10/15/2008 $ 3,181.28 All West Underground - Trench Box 10/9/2008 $ (1,282.32) All West Underground - Trench Box 10/9/2008 $ (269.62) All West Underground - Trench Box $ (1,150.80) All West Underground - Trench Box $ 1,867.58 All West Underground 10/23/2008 $ 447.64 C.A. Goodman, 4 steel sheets 10/21/2008 $ 1,368.36 Star Rentals 9/23/2008 $ 448.79 Star Rentals 8/27/2008 $ 427.43 Sunbelt 9/29/2008 $ 1,227.28 Sunbelt 10/16/2008 $ 3,436.02 United Rentals 9/26/2008 $ 916.43 United Rentals 10/9/2008 $ 553.43 United Rentals 10/22/2008 $ 5,482.54 United Rentals 10/16/2008 $ 33.12 . .. TOT ALRENTAL $ 25J476.~8 I I MATERIALS Item Date Amount Ace Paving: 1-1/4" minus 8/21/2008 $ 128.43 Ace Paving: broken asphalt 8/22/2008 $ 48.20 Ace Paving: 1-1/4" minus 8/25/2008 $ 342.62 Ace Paving: trucking 8/8/2008 $ 187.50 Capitol Pilot and permit 8/27/2008 $ 382.24 Ace Paving: CSTC and crushed materia 10/1/2008 $ 472.09 Ace Paving: trucking 10/1/2008 $ 270.00 Ace Paving: 3/4" minus 10/7/2008 $ 372 .46 Ace Paving: trucking 10/8/2008 $ 135.00 Ace Paving: trucking 10/8/2008 $ 270.00 Ace Paving: 1-1/4" minus and crushed r 10/15/2008 $ 769.11 Ace Paving: crushed material 10/16/2008 $ 71.15 Highway Specialties: signs 8/22/2008 $ 2,571.25 Home Depot: poly sheet 8/24/2008 $ 97.01 Home Depot: poly sheet 10/5/2008 $ 172.22 Lakeside Industries 8/20/2008 $ 651.25 Tacoma Screw Products .9./30/2008 $ 104.49 TOTAL' MATERIAlS -. . :.~.' $ >7,045.02 .-, .. .-- - '.- .: :.',,(: . ..c.. . .:::........ ':.,.... CITY OF BREMERTON wjd SEWAGE PUMP STATION OB-1 PUMP STATION AND FORCE MAIN REPAIR 1/29/2009 SUNBEL T RENTALS - SERVICE COMPANY: HOPE SUPPLIER AND LABOR From Invoice: LABOR $13,861.50 MATERIALS $22,399.08 EQUIPMENT $2,555.00 FREIGHT/OTHER $4,197.36 SUBTOTAL $43,012.94 TAX ON RENTAL $219.73 TOTAL SUNBEL T $43,232.67 Note: Sun belt Rentals is a service contractor hired by Pease and Sons. Markup up 21 %. Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4748 PEASE & SONS INC OB-1 Pump Station & Force Main Repair Engineering LEG 12-1 08/18/2008 09/30/2008 10/01/2008 ,j PUBLIC WORKS AGREEMENT THIS AGREEMENT, is entered into between the City of Bremerton, a Washington Municipal Corporation ("City"), and Pease & Sons Inc. ("Contractor"), whose mailing address is P.O. Box 44100 Tacoma, WA, WA ~-~. 9S#8- OIOQ~ The parties agree as follows: ~ 1. CONTRACTOR SERVICES. The Contractor shall perform emergency construction services, in accordance with generally accepted standards and at the direction of the Public Works Director (Director) for the following project: Provide labor, equipment, and materials to upgrade Sewage Pump Station OB-1 and install approximately 120 feet of force main immediately outside the pump station as noted on the attached plan sheet and as discussed during the site meetings on July 22 and July 31, 2008. The City is prepurchasing all epoxy-lined ductile iron pipe and fittings that require a lengthy lead time. The Contractor shall purchase miscellaneous fittings, restraints and other materials as directed by the City. The Contractor shall purchase and install materials, and contract with a pipe fusion services company (as needed) to install approximately 120 LF of 12" HDPE (PE3048) pipe, beginning immediately outside the pump station and terminating immediately south of the thrust block located at the top of the slope north of Kitsap Way. The City will be responsible for bypassing all flow while the pump station and force main are under construction. All work shall be performed under the control of the Director as provided in Section 1-05 CONTROL OF WORK of the Washington State Department of Transportation Standard Specifications for Road, Bridge and Municipal Construction 2008 ("Standard Specifications") 2. TIME OF COMPLETION. Time is of the essence for completion of this work. Contractor shall complete the work in a reasonable time frame. given the current conditions of the site and based on the amount and type of work directed to be done by the Director. 3. COMPENSATION. The City shall pay the Contractor, for the work and services contemplated in this agreement, on a Time and Materials Basis as calculated in Section 1-09.6 FORCE ACCOUNT of the Standard Specifications, provided in addition to on-site labor, the Contractor shall be compensated for necessary on-site supervision as approved by the City. This compensation shall not exceed the total amount of $100,000 plus any applicable Washington State Sales Tax. The Contractor shall invoice the City upon completion of the work. The City will pay for the portion of the work described in the invoice that has been completed by the Contractor and approved by the City. The City payment shall not constitute a waiver of the City's right to final inspection and acceptance of the project. A. Performance Bond. Within 5 days of written notice to proceed and pursuant to Chapter 39.08 RCW, the Contractor, shall provide the City a performance bond for the amount indicated above, to be in effect until sixty (60) days after Public Works Agreement City of BremertonlPease and Sons 08-1 Pump Station and Force Main Repair August 2008 Page 1 of6 the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor and Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Retainage. The City shall hold back a retainage in the amount of five percent (5%) of any and all payments made to contractor for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor & Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. C. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. D. Final Payment: Waiver of Claims. THE MAKING OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERL Y MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS MADE. 4. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor - Employer Relationship will be created by this agreement, the City being interested only in the results obtained under this agreement. 5. TERMINATION. The City may terminate this agreement when determined by the Director to be in the best interest of the City. In the event of termination, the Contractor shall be compensated for all work completed, including all materials acquired for the project, through the effective date of termination. All such materials acquired for the project shall become the property of the City. If the City terminates this agreement, the Contractor shall not receive any further monies under this agreement. 6. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. Public Works Agreement City of BremertonlPease and Sons OB-l Pump Station and Force Main Repair August 2008 Page 2 of6 7. CLAIMS. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims. Any claim for damages, additional payment for any reason, or extension of time, whether under this agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this agreement; or, if (and only if) no such provision is applicable, unless that claim is set forth in detail in writing and received by the City within seven (7) calendar days from the date Contractor knew, or should have known, of the facts giving rise to the claim. At a minimum, a Contractor's written claim must include the information set forth regarding protests in Section 7.A.2.a.-e. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THA T DELAY. Contractor must, in any event, file any claim or bring any suit arising from or connected with this agreement within 120 calendar days from the date the contract work is complete. 8. WARRANTY. The Contractor shall correct all defects in workmanship and materials within one year from the date of the City's acceptance of the Contract work. When defects are corrected, the warranty for that portion of the work shall extend for one year form the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. 9. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officer, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits including all legal costs and attorney fees, arising out of or in connection with the performance of this agreement, except for injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS INDEMNIFICATION CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF THIS INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this agreement. Public Works Agreement City of BremertonlPease and Sons OB-I Pump Station and Force Main Repair August 2008 Page 3 of6 10. INSURANCE. The Contractor shall procure and maintain for the duration of this agreement insurance of the types and in the amounts described below against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work by the Contractor, its agents, representative, employees, subconsultants or subcontractors. Before beginning work on the project described in this agreement, the Contractor shall provide a Certificate of Insurance evidencing: 1. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operationslbroad form property damage; explosion, collapse and underground (XCD); and employer's liability. 3. Excess Liability insurance with limits not less than $1,000,000 per occurrence and aggregate. Any payment of deductible or self insured retention shall be the sole responsibility of the Contractor. The City, its officials, employees, agents and volunteers shall be named as an additional insured on the insurance policy, as respects work performed by or on behalf of the Contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The Contractor's insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits ofthe insurer's liability. The Contractor's insurance shall be primary insurance as respects the City, and the City shall be given thirty (30) calendar days prior written notice by certified mail, return receipt requested, of any cancellation, suspension or material change in coverage. 11. MISCELLANEOUS. A. Nondiscrimination. In the hiring of employees for the performance of work under this Agreement or any sub-contract hereunder, the Contractor, its sub-contractors, or any person acting on behalf of such Contractor or sub-contractor shall not, by reason of race, religion, color, sex, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. B. Compliance with Laws. Contractor shall comply with all federal, state and local laws, rules and regulations throughout every aspect in the performance of this agreement. Public Works Agreement City of BremertonlPease and Sons OB-l Pump Station and Force Main Repair August 2008 Page 4 of6 C. Work Performed at Contractor's Risk. Contractor shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of this agreement. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. D. Nonwaiver of Breach. The failure of the City to insist upon strict performance of any of the terms and rights contained herein, or to exercise any option herein conferred in one or more instances, shall not be constructed to be a waiver or relinquishment of those terms and rights and they shall remain in full force and effect E. Governing Law. This agreement shall be governed and construed in accordance with the laws of the State of Washington. If any dispute arises between the City and Contractor under any of the provisions of this agreement, resolution of that dispute shall be available only through the jurisdiction, venue and rules of the Kitsap County Superior Court, Kitsap County, Washington. F. Attorney's Fees. To the extent not inconsistent with RCW 39.04.240, in any claim or lawsuit for damages arising from the parties' performance of this agreement, each party shall be responsible for payment of its own legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit; however, nothing in this subsection shall limit the City's right to indemnification under Section 10 of this agreement. G. Written Notice. All communications regarding this agreement shall be sent to the parties at the addresses listed on the signature page of this agreement, unless otherwise notified. Any written notice shall become effective upon delivery, but in any event three (3) calendar days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated on this agreement. H. Assignment. Any assignment of this agreement by the Contractor without the written consent of the City shall be void. I. Modification. No waiver, alteration, or modification of any of the provisions of this agreement shall be binding unless in writing and signed by a duly authorized representative ofthe City and Contractor. J. Severability. If anyone or more sections, sub-sections, or sentences of this agreement are held to be unconstitutional or invalid, that decision shall not affect the validity of the remaining portion of this agreement and the remainder shall remain in full force and effect. Public Works Agreement City of Bremerton!Pease and Sons OB-l Pump Station and Force Main Repair August 2008 Page 5 of6 K. Entire Agreement. The written provlSlons and terms of this agreement, together with any attached Exhibits, supersede all prior verbal statements by any representative of the City, and those statements shall not be construed as forming a part of or altering in any manner this agreement. This agreement and any attached Exhibits contain the entire agreement between the parties. Should any language in any Exhibit to this agreement conflict with any language contained in this agreement, the terms of this agreement shall prevail. IN WITNESS WHEREOF, the parties below have executed this agreement. ~OF~ Cary Bozeman Mayor DA TE: I ~ of August, 2008 Notices to be sent to: Notices to be sent to: CONTRACTOR: CITY OF BREMERTON: Pease & Sons Inc. P.O. Box 44100 Tacoma, W A, W A 98444-0100 City Clerk ATTN: Carol Etgen 345 Sixth Street Bremerton, WA 98337 Dept. of PW &U - Engineering Division ATTN: Bill Davis 3027 Olympus Drive Bremerton, W A 98310 ATTEST: Public Works Agreement City of BremertonlPease and Sons OB-l Pump Station and Force Main Repair August 2008 Page 60f6 #7177 - Bremerton OB-1 Pump Station Emergency Contract Pease labor Rates Rates as of 6/1/08* Local 26 Local 26 Local 26 Local 26 Local 26 Local 26 Plumber Plumber Plumber Carpenter Carpenter Carpenter DESCRIPTION % Foreman Foreman OT Foreman PT Plumber Plumber OT Plumber PT Foreman Foreman OT Foreman PT 1 BASE WAGE (TAXABLE) $ 40.70 $ 61.05 $ 81.40 $ 37.00 $ 55.50 $ 74.00 $ 38.05 $ 57.08 $ 76.10 2 FRINGE $ 16.12 $ 16.12 $ 16.12 $ 16.12 $ 16.12 $ 16.12 $ 11.57 $ 11.57 $ 11.57 3 FICA / MEDICARE 7.650% $ 3.11 $ 4.67 $ 6.23 $ 2.83 $ 4.25 $ 5.66 $ 2.91 $ 4.37 $ 5.82 4 FEDERAL UNEMPLOYMENT 0.80% $ 0.33 $ 0.49 $ 0.65 $ 0.30 $ 0.44 $ 0.13 $ 0.30 $ 0.46 $ 0.61 5 STATE UNEMPLOYMENT 6.14% $ 2.50 $ 3.75 $ 5.00 $ 2.27 $ 3.41 $ 0.35 $ 2.34 $ 3.50 $ 4.67 6 INSURANCE 8.50% $ 3.46 $ 5.19 $ 6.92 $ 3.15 $ 4.72 $ 0.01 $ 3.23 $ 4.85 $ 6.47 7 INDUSTRIAL INSURANCE $ 1.93 $ 1.93 $ 1.93 $ 1.93 $ 1.93 $ 1.93 $ 3.02 $ 3.02 $ 3.02 SUBTOTAL $ 68.15 $ 93.20 $ 118.25 $ 63.59 $ 86.36 $ 98.20 $ 61.43 $ 84.84 $ 108.26 8 OVERHEAD AND PROFIT 29.00% $ 19.76 $ 27.03 $ 34.29 $ 18.44 $ 25.05 $ 28.48 $ 17.81 $ 24.60 $ 31.40 TOTAL PER HOUR $ 87.91 $ 120.22 $ 152.54 $ 82.04 $ 111.41 $ 126.68 $ 79.24 $ 1 09.45 $ 139.66 Laborer Laborer Laborer DESCRIPTION % Carpenter Carpenter OT Carpenter PT Foreman Foreman OT Foreman PT Laborer Laborer OT Laborer PT 1 BASE WAGE (TAXABLE) $ 34.59 $ 51.89 $ 69.18 $ 31.66 $ 47.49 $ 63.32 $ 29.66 $ 44.49 $ 59.32 2 FRINGE $ 11.57 $ 11.57 $ 11.57 $ 8.46 $ 8.46 $ 8.46 $ 8.46 $ 8.46 $ 8.46 3 FICA / MEDICARE 7.650% $ 2.65 $ 3.97 $ 5.29 $ 2.42 $ 3.63 $ 4.84 $ 2.27 $ 3.40 $ 4.54 4 FEDERAL UNEMPLOYMENT 0.80% $ 0.28 $ 0.42 $ 0.55 $ 0.25 $ 0.38 $ 0.51 $ 0.24 $ 0.36 $ 0.47 5 STATE UNEMPLOYMENT 6.14% $ 2.12 $ 3.19 $ 4.25 $ 1.94 $ 2.92 $ 3.89 $ 1.82 $ 2.73 $ 3.64 6 INSURANCE 8.50% $ 2.94 $ 4.41 $ 5.88 $ 2.69 $ 4.04 $ 5.38 $ 2.52 $ 3.78 $ 5.04 7 INDUSTRIAL INSURANCE $ 3.02 $ 3.02 $ 3.02 $ 3.02 $ 3.02 $ 3.02 $ 3.02 $ 3.02 $ 3.02 SUBTOTAL $ 57.17 $ 78.46 $ 99.74 $ 50.45 $ 69.94 $ 89.42 $ 47.99 $ 66.24 $ 84.50 8 OVERHEAD AND PROFIT 29.00% $ 16.58 $ 22.75 $ 28.93 $ 14.63 $ 20.28 $ 25.93 $ 13.92 $ 19.21 $ 24.50 TOTAL PER HOUR $ 73.75 $ 101.21 $ 128.67 $ 65.08 $ 90.22 $ 115.35 $ 61.91 $ 85.45 $ 109.00 \\Rainier\HOME\Jenn\Projects\#7177 - Bremerton OB-1 Pump Station Emergency Contract\WSDOT Labor Rates for Emergency Contract APPENDIX A PREVAILING WAGES FOR KITSAP COUNTY State of Washington DEPARTMENT OF LABOR AND INDUSTRIES Prevailing Wage Section - Telephone (360) 902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage Rates For Public Works Contracts The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, workers' wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements is provided on the Benefit Code Key. KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** Classification ASBESTOS ABATEMENT WORKERS JOURNEY LEVEL BOILERMAKERS JOURNEY LEVEL BRICK AND MARBLE MASONS JOURNEY LEVEL CABINET MAKERS (IN SHOP) JOURNEY LEVEL CARPENTERS ACOUSTICAL WORKER BRIDGE, DOCK AND WARF CARPENTERS CARPENTER CREOSOTED MATERIAL DRYWALL APPLICATOR FLOOR FINISHER FLOOR LAYER FLOOR SANDER MILLWRIGHT AND MACHINE ERECTORS PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING SAWFILER SHINGLER STATIONARY POWER SAW OPERATOR STATIONARY WOODWORKING TOOLS CEMENT MASONS JOURNEY LEVEL DIVERS & TENDERS DIVER DIVER TENDER DREDGE WORKERS ASSISTANT ENGINEER ASSISTANT MATE (DECKHAND) BOATMEN ENGINEER WELDER LEVERMAN, HYDRAULIC MAINTENANCE MATES OILER DRYWALL TAPERS JOURNEY LEVEL ELECTRICAL FIXTURE MAINTENANCE WORKERS JOURNEY LEVEL Page 1 PREVAILING WAGE (See Benefit Code Key) Over Time Holiday Code Code Note Code $36.24 5D 1H $30.34 $43.75 1M 5A $12.53 $43.91 $43.75 $43.75 $43.85 $43.79 $43.75 $43.75 $43.75 $44.75 $43.95 $43.75 $43.75 $43.75 $43.75 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 50 1M 5D 8A 1M 5D 1T 5D 8L 1T 5D 8L 1T 5D 8L 1T 5D 8L 1T 5D 8L 1T 5D 8L 1T 5D 8L 1T 5D 8L 1E 5P $44.58 $85.75 $44.22 $44.59 $44.08 $44.59 $44.64 $46.21 $44.08 $44.59 $44.21 $43.59 $9.37 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING lime Holiday Note Classification WAGE Code Code Code ELECTRICIANS - INSIDE CABLE SPLICER $55.05 1E 5A CABLE SPLICER (TUNNEL) $58.86 1E 5A CERTIFIED WELDER $53.16 1E 5A CERTIFIED WELDER (TUNNEL) $57.15 1E 5A CONSTRUCTION STOCK PERSON $28.83 1E 5A JOURNEY LEVEL $51.25 1E 5A JOURNEY LEVEL (TUNNEL) $55.05 1E 5A ELECTRICIANS - MOTOR SHOP CRAFTSMAN $15.37 2A 6C JOURNEY LEVEL $14.69 2A 6C ELECTRICIANS - POWERLlNE CONSTRUCTION CABLE SPLICER $56.53 4A 5A CERTIFIED LINE WELDER $51.64 4A 5A GROUNDPERSON $37.15 4A 5A HEAD GROUNDPERSON $39.19 4A 5A HEAVY LINE EQUIPMENT OPERATOR $51.64 4A 5A JACKHAMMER OPERATOR $39.'19 4A 5A JOURNEY LEVEL L1NEPERSON $51.64 4A 5A LINE EQUIPMENT OPERATOR $43.83 4A 5A POLE SPRAYER $51.64 4A 5A POWDERPERSON $39.19 4A 5A ELECTRONIC TECHNICIANS ELECTRONIC TECHNICIANS JOURNEY LEVEL $40.08 10 5A ELEVATOR CONSTRUCTORS MECHANIC $60.85 4A 6Q MECHANIC IN CHARGE $66.25 4A 6Q FABRICATED PRECAST CONCRETE PRODUCTS ALL CLASSIFICATIONS $13.50 FENCE ERECTORS FENCE ERECTOR $13.80 FENCE LABORER $11.60 FLAGGERS JOURNEY LEVEL $31.01 1H 50 GLAZIERS JOURNEY LEVEL $43.76 1H 5G HEAT & FROST INSULATORS AND ASBESTOS WORKERS MECHANIC $46.59 1S 5J HEATING EQUIPMENT MECHANICS MECHANIC $18.45 HOD CARRIERS & MASON TENDERS JOURNEY LEVEL $36.75 1H 5D INDUSTRIAL ENGINE AND MACHINE MECHANICS MECHANIC $15.65 INDUSTRIAL POWER VACUUM CLEANER JOURNEY LEVEL $9.24 INLAND BOATMEN CAPTAIN $38.87 1K 58 COOK $32.73 1K 58 DECKHAND $32.42 1K 58 ENGINEER/DECKHAND $35.20 1K 5B MATE, LAUNCH OPERATOR $36.85 1K 5B Page 2 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** Classification INSPECTION/CLEANING/SEALING OF SEWER & WATER SYSTEMS BY REMOTE CONTROL CLEANER OPERATOR, FOAMER OPERATOR GROUT TRUCK OPERATOR HEAD OPERATOR TECHNICIAN TV TRUCK OPERATOR INSULATION APPLICATORS JOURNEY LEVEL IRONWORKERS JOURNEY LEVEL LABORERS ASPHALT RAKER BALLAST REGULATOR MACHINE BATCH WEIGHMAN . BRUSH CUTTER BRUSH HOG FEEDER BURNERS CARPENTER TENDER CASSION WORKER CEMENT DUMPER/PAVING CEMENT FINISHER TENDER CHANGE-HOUSE MAN OR DRY SHACKMAN CHIPPING GUN (OVER 30 LBS) CHIPPING GUN (UNDER 30 LBS) CHOKER SETTER CHUCK TENDER CLEAN-UP LABORER CONCRETE DUMPER/CHUTE OPERATOR CONCRETE FORM STRIPPER CONCRETE SAW OPERATOR CRUSHER FEEDER CURING LABORER DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED MATERIALS) DITCH DIGGER DIVER DRILL OPERATOR (HYDRAULIC, DIAMOND) DRILL OPERATOR, AIRTRAC DUMPMAN EPOXY TECHNICIAN EROSION CONTROL WORKER FALLER/BUCKER, CHAIN SAW FINAL DETAIL CLEANUP (Le., dusting, vacuuming, window cleaning; NOT construction debris cleanup) FINE GRADERS FIRE WATCH FORM SETTER GABION BASKET BUILDER GENERAL LABORER GRADE CHECKER & TRANSIT PERSON GRINDERS GROUT MACHINE TENDER Page 3 PREVAILING WAGE $9.73 $11.48 $12.78 $8.07 $24.17 $43.75 $47.92 $36.75 $36.24 $31.01 $36.24 $36.24 $36.24 $36.24 $37.20 $36.75 $36.24 $36.24 $36.75 $36.24 $36.24 $36.24 $36.24 $36.75 $36.24 $36.75 $31.01 $36.24 $36.24 $36.24 $37.20 $36.75 $37.20 $36.24 $36.24 $36.24 $36.75 $28.45 $36.24 $31.01 $36.24 $36.24 $36.24 $36.75 $36.24 $36.24 (See Benefit Code Key) Over Time Holiday Code Code Note Code 1M 5D 10 5A 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D 1H 5D KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code GUARDRAIL ERECTOR $36.24 1H 5D HAZARDOUS WASTE WORKER LEVEL A $37.20 1H 5D HAZARDOUS WASTE WORKER LEVEL B $36.75 1H 5D HAZARDOUS WASTE WORKER LEVEL C $36.24 1H 5D HIGH SCALER $37.20 1H 5D HOD CARRIER/MORT ARMAN $36.75 1H 5D JACKHAMMER $36.75 1H 5D LASER BEAM OPERATOR $36.75 1H 5D MANHOLE BUILDER-MUDMAN $36.75 1H 5D MATERIAL YARDMAN $36.24 1H 5D MINER $37.20 1H 5D NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH $36.75 1H 5D PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST, GUNITE, SHOTCRETE, WATER BLASTER PAVEMENT BREAKER $36.75 1H 5D PILOT CAR $31.01 1H 5D PIPE POT TENDER $36.75 1H 5D PIPE RELlNER (NOT INSERT TYPE) $36.75 1H 5D PIPELAYER & CAULKER $36.75 1H 5D PIPELAYER & CAULKER (LEAD) $37.20 1H 5D PIPEWRAPPER $36.75 1H 5D POT TENDER $36.24 1H 5D POWDER MAN $37.20 1H 5D POWDER MAN HELPER $36.24 1H 5D POWERJACKS $36.75 1H 5D RAILROAD SPIKE PULLER (POWER) $36.75 1H 5D RE-TIMBERMAN $37.20 1H 5D RIPRAP MAN $36.24 1H 5D RODDER $36.75 1H 5D SCAFFOLD ERECTOR $36.24 1H 5D SCALE PERSON $36.24 1H 5D SIGNALMAN $36.24 1H 5D SLOPER (OVER 20") $36.75 1H 5D SLOPER SPRAYMAN $36.24 1H 5D SPREADER (CLARY POWER OR SIMILAR TYPES) $36.75 1H 5D SPREADER (CONCRETE) $36.75 1H 5D STAKE HOPPER $36.24 1H 5D STOCKPILER $36.24 1H 5D TAMPER & SIMILAR ELECTRIC, AIR & GAS $36.75 1H 5D TAMPER (MULTIPLE & SELF PROPELLED) $36.75 1H 5D TOOLROOM MAN (AT JOB SITE) $36.24 1H 5D TOPPER-TAILER $36.24 1H 5D' TRACK LABORER $36.24 1H 5D TRACK LINER (POWER) $36.75 1H 5D TRUCK SPOTTER $36.24 1H 5D TUGGER OPERATOR $36.75 1H 5D VIBRATING SCREED (AIR, GAS, OR ELECTRIC) $36.24 1H 5D VIBRATOR $36.75 1H 5D VINYL SEAMER $36.24 1H 5D WELDER $36.24 1H 5D WELL-POINT LABORER $36.75 1H 5D Page 4 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code LABORERS - UNDERGROUND SEWER & WATER GENERAL LABORER $36.24 1H 5D PIPE LAYER $36.75 1H 5D LANDSCAPE CONSTRUCTION IRRIGATION OR LAWN SPRINKLER INSTALLERS $9.25 LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $10.05 LANDSCAPING OR PLANTING LABORERS $12.92 LATHERS JOURNEY LEVEL $43.79 1M 5D METAL FABRICATION (IN SHOP) FITTER $26.96 LABORER $8.07 MACHINE OPERATOR $13.83 WELDER $13.83 MODULAR BUILDINGS CABINET ASSEMBLY $11.56 ELECTRICIAN $11.56 EQUIPMENT MAINTENANCE $11.56 PLUMBER $11.56 PRODUCTION WORKER $9.40 TOOL MAINTENANCE $11.56 UTILITY PERSON $11.56 WELDER $11.56 PAINTERS JOURNEY LEVEL $33.94 2B 5A PLASTERERS JOURNEY LEVEL $43.10 1R 5B PLAYGROUND & PARK EQUIPMENT INSTALLERS JOURNEY LEVEL $8. 54 PLUMBERS & PIPEFITTERS JOURNEY LEVEL $50.92 1G 5A POWER EQUIPMENT OPERATORS ASSISTANT ENGINEERS $42.14 1T 5D 8L BACKHOE, EXCAVATOR, SHOVEL (3 YD & UNDER) $44.92 1T 5D 8L BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YD & UNDER 6 YD) $45.41 1T 5D 8L BACKHOE, EXCAVATOR, SHOVEL (6 YD AND OVER WITH ATTACHMENTS) $45.96 1T 5D 8L BACKHOES, (75 HP & UNDER) $44.50 1T 5D 8L BACKHOES, (OVER 75 HP) $44.92 1T 5D 8L BARRIER MACHINE (ZIPPER) $44.92 1T 5D 8L BATCH PLANT OPERATOR, CONCRETE $44.92 1T 5D 8L BELT LOADERS (ELEVATING TYPE) $44.50 1T 5D 8L BOBCAT (SKID STEER) $42.14 1T 5D 8L BROOMS $42.14 1T 5D 8L BUMP CUTTER $44.92 1T 5D 8L CABLEWAYS $45.41 1T 5D 8L CHIPPER $44.92 1T 5D 8L COMPRESSORS $42.14 1T 5D 8L CONCRETE FINISH MACHINE - LASER SCREED $42.14 1T 5D 8L CONCRETE PUMPS $44.50 1T 5D 8L CONCRETE PtJMP- TRUCK MOUNT WITH BOOM ATTACHMENT $44.92 1T 5D 8L CONVEYORS $44.50 1T 5D 8L CRANES, THRU 19 TONS, WITH ATTACHMENTS $44.50 1T 5D' 8L Page 5 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code CRANES, 20 - 44 TONS, WITH ATTACHMENTS $44.92 1T 5D 8L CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB $45.41 1T 5D 8L WITH ATACHMENTS) CRANES, 100 TONS - 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB $45.96 1T 5D 8L WITH ATTACHMENTS) CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $46.53 1T 5D 8L WITH ATTACHMENTS) CRANES, A-FRAME, 10 TON AND UNDER $42.14 1T 5D 8L CRANES,A-FRAME,OVER10TON $44.50 1T 5D 8L CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $47.09 1T 5D 8L ATTACHMENTS CRANES, OVERHEAD, BRIDGE TYPE ( 20 - 44 TONS) $44.92 1T 5D 8L CRANES, OVERHEAD, BRIDGE TYPE ( 45 - 99 TONS) $45.41 1T 5D 8L CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) $45.96 1T 5D 8L CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM $45.96 1T 5D 8L CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM $46.53 1T 5D 8L CRUSHERS $44.92 1T 5D 8L DECK ENGINEERIDECK WINCHES (POWER) $44.92 1T 5D 8L DERRICK, BUILDING $45.41 1T 5D 8L DOZERS, D-9 & UNDER $44.50 1T 5D 8L DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT $44.50 1T 5D 8L DRILLING MACHINE $44.92 1T 5D 8L ELEVATOR AND MANLlFT, PERMANENT AND SHAFT-TYPE $42.14 1T 5D 8L EQUIPMENT SERVICE ENGINEER (OILER) $44.50 1T 5D 8L FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP $44.92 1T 5D 8L FORK LIFTS, (3000 LBS AND OVER) $44.50 1T 5D 8L FORK LIFTS, (UNDER 3000 LBS) $42.14 1T 5D 8L GRADE ENGINEER $44.50 1T 5D 8L GRADECHECKER AND STAKE MAN $42.14 1T 5D 8L GUARDRAIL PUNCH $44.92 1T 5D 8L HOISTS, OUTSIDE (ELEVATORS AND MANLlFTS), AIR TUGGERS $44.50 1T 5D 8L HORIZONTAUDIRECTIONAL DRILL LOCATOR $44.50 1T 5D 8L HORIZONTAUDIRECTIONAL DRILL OPERATOR $44.92 1T 5D 8L HYDRALlFTS/BOOM TRUCKS (10 TON & UNDER) $42.14 1T 5D 8L HYDRALlFTS/BOOM TRUCKS (OVER 10 TON) $44.50 1T 5D 8L LOADERS, OVERHEAD (6 YD UP TO 8 YD) $45.41 1T 5D 8L LOADERS, OVERHEAD (8 YD & OVER) $45.96 1T 5D 8L LOADERS, OVERHEAD (UNDER 6 YD), PLANT FEED $44.92 1T 5D 8L LOCOMOTIVES, ALL $44.92 1T 5D 8L MECHANICS, ALL $45.41 1T 5D 8L MIXERS, ASPHALT PLANT $44.92 1T 5D 8L MOTOR PATROL GRADER (FINISHING) $44.92 1T 5D 8L MOTOR PATROL GRADER (NON-FINISHING) $44.50 1T 5D 8L MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD $45.41 1T 5D 8L OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $42.14 1T 5D 8L OPERATOR PAVEMENT BREAKER $42.14 1T 5D 8L PILEDRIVER (OTHER THAN CRANE MOUNT) $44.92 1T 5D 8L PLANT OILER (ASPHALT, CRUSHER) $44.50 1T 5D 8L POSTHOLE DIGGER, MECHANICAL $42.14 1T 5D 8L POWER PLANT $42.14 1T 5D 8L PUMPS, WATER $42.14 1T 5D 8L QUAD 9, D-10, AND HD-41 $45.41 1T 5D 8L Page 6 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $45.41 1T 5D 8L EQUIP RIGGER AND BELLMAN $42.14 1T 5D 8L ROLLAGON $45.41 1T 5D 8L ROLLER, OTHER THAN PLANT ROAD MIX $42.14 1T 5D 8L ROLLERS, PLANTMIX OR MUL TILlFT MATERIALS $44.50 1T 5D 8L ROTO-MILL, ROTO-GRINDER $44.92 1T 5D 8L SAWS, CONCRETE $44.50 1T 5D 8L SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING $44.92 1T 5D 8L OFF-ROAD EQUIPMENT ( UNDER 45 YD) SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING $45.41 1T 5D 8L OFF-ROAD EQUIPMENT (45 YD AND OVER) SCRAPERS, CONCRETE AND CARRY ALL $44.50 1T 5D 8L SCREED MAN $44.92 1T 5D 8L SHOTCRETE GUNITE $42.14 1T 5D 8L SLlPFORM PAVERS $45.41 1T 5D 8L SPREADER, TOPSIDE OPERATOR - BLAW KNOX $44.92 1T 5D 8L SUBGRADE TRIMMER $44.92 1T 5D 8L TOWER BUCKET ELEVATORS $44.50 1T 5D 8L TRACTORS, (75 HP & UNDER) $44.50 1T 5D 8L TRACTORS, (OVER 75 HP) $44.92 1T 5D 8L TRANSFER MATERIAL SERVICE MACHINE $44.92 1T 5D 8L TRANSPORTERS, ALL TRACK OR TRUCK TYPE $45.41 1T 5D 8L TRENCHING MACHINES $44.50 1T 5D 8L TRUCK CRANE OILER/DRIVER (UNDER 100 TON) $44.50 1T 5D 8L TRUCK CRANE OILER/DRIVER (100 TON & OVER) $44.92 1T 5D 8L TRUCK MOUNT PORTABLE CONVEYER $44.92 1T 5D 8L WHEEL TRACTORS,FARMALL TYPE $42.14 1T 5D 8L YO YO PAY DOZER $44.92 1T 5D 8L POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER (SEE POWER EQUIPMENT OPERATORS) POWER LINE CLEARANCE TREE TRIMMERS JOURNEY LEVEL IN CHARGE $37.61 4A 5A SPRAY PERSON $35.73 4A 5A TREE EQUIPMENT OPERATOR $36.19 4A 5A TREE TRIMMER $33.68 4A 5A TREE TRIMMER GROUNDPERSON $25.43 4A 5A REFRIGERATION & AIR CONDITIONING MECHANICS MECHANIC $50.92 1G 5A RESIDENTIAL BRICK & MARBLE MASONS JOURNEY LEVEL $17.04 RESIDENTIAL CARPENTERS JOURNEY LEVEL $20.00 RESIDENTIAL CEMENT MASONS JOURNEY LEVEL $30.87 RESIDENTIAL DRYWALL TAPERS JOURNEY LEVEL $20.00 RESIDENTIAL ELECTRICIANS JOURNEY LEVEL $14.00 RESIDENTIAL GLAZIERS J6URNEYLEVEL $31.99 1H 5G RESIDENTIAL INSULATION APPLICATORS JOURNEY LEVEL $13.96 Page 7 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** Classification PREVAILING WAGE (See Benefit Code Key) Over Time Holiday Note Code Code Code RESIDENTIAL LABORERS JOURNEY LEVEL RESIDENTIAL PAINTERS JOURNEY LEVEL RESIDENTIAL PLUMBERS & PIPEFITTERS JOURNEY LEVEL RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) RESIDENTIAL SOFT FLOOR LAYERS JOURNEY LEVEL RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL RESIDENTIAL TERRAZZOfTILE FINISHERS JOURNEY LEVEL ROOFERS JOURNEY LEVEL USING IRRITABLE BITUMINOUS MATERIALS SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) SHIPBUILDING & SHIP REPAIR CARPENTER ELECTRICIAN HEAT & FROST INSULATOR LABORER MACHINIST OPERATOR PA!NTER PIPEFITTER RIGGER SHEET METAL SHIPFITTER WELDER/BURNER SIGN MAKERS & INSTALLERS (ELECTRICAL) JOURNEY LEVEL SIGN MAKERS & INSTALLERS (NON-ELECTRICAL) JOURNEY LEVEL SOFT FLOOR LAYERS JOURNEY LEVEL SOLAR CONTROLS FOR WINDOWS JOURNEY LEVEL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL STAGE RIGGING MECHANICS (NON STRUCTURAL) JOURNEY LEVEL SURVEYORS CHAIN PERSON INSTRUMENT PERSON PARTY CHIEF TELECOMMUNICATION TECHNICIANS TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL TELEPHONE LINE CONSTRUCTION - OUTSIDE CABLE SPLICER . $10.04 $16.21 $21.11 $33.04 1E 6L $36.08 1B 5A $31.01 1B 5C $30.26 $36.78 $39.78 1R 5A 1R 5A 1E 6L 1B 6W 1B 6W 1S 5J 1 1B 6W 1B 6W 1 1B 6W 1B 6W 1 1B 6W 1B 6W $51.97 $19.29 $25.53 $46.59 $19.64 $19.29 $19.44 $22.24 $19.29 $19.29 $22.21 $19.29 $19.29 $20.58 $9.27 $36.08 1B 5A $10.31 1B 50 $55.64 1X 5C $13.23 $9.35 $11.40 $13.40 $32.34 1E 5A $30.66 2B 5A Page 8 KITSAP COUNTY Effective 03-02-08 ********************************************************************************************************** Classification HOLE DIGGER/GROUND PERSON INSTALLER (REPAIRER) JOURNEY LEVEL TELEPHONE L1NEPERSON SPECIAL APPARATUS INSTALLER I SPECIAL APPARATUS INSTALLER II TELEPHONE EQUIPMENT OPERATOR (HEAVY) TELEPHONE EQUIPMENT OPERATOR (LIGHT) TELEVISION GROUND PERSON TELEVISION L1NEPERSONIINSTALLER TELEVISION SYSTEM TECHNICIAN TELEVISION TECHNICIAN TREE TRIMMER TERRAZZO WORKERS & TILE SETTERS JOURNEY LEVEL TILE, MARBLE & TERRAZZO FINISHERS FINISHER TRAFFIC CONTROL STRIPERS JOURNEY LEVEL TRUCK DRIVERS ASPHALT MIX (TO 16 YARDS) ASPHALT MIX (OVER 16 YARDS) DUMP TRUCK DUMP TRUCK & TRAILER OTHER TRUCKS TRANSIT MIXER WELL DRILLERS & IRRIGATION PUMP INSTALLERS IRRIGATION PUMP INSTALLER OILER WELL DRILLER Page 9 PREVAILING WAGE $17.19 $29.41 $28.53 $30.66 $30.05 $30.66 $28.53 $16.31 $21.68 $35.78 $23.19 $28.53 $41.96 $12.00 $36.40 $41.19 $41.90 $19.60 $19.60 $18.37 $20.79 $13.17 $14.08 $14.40 (See Benefit Code Key) Over Time Holiday Note Code Code Code 2B 5A 2B 5A 2B 5A 2B 5A 2B 5A 2B 5A 2B 5A 2B 5A 2B 5A 2B 5A 2B 5A 2B 5A 1M 5A 1K 5A 1T 5D 8L 1T 5D 8L 1 1 1 1 APPENDIX B MECHANICAL PLAN z -.;;z q, c:z SCALE: 1"=~ 5D' ,~-.. ( 2 \-" ,.-.../ .......,"-'..... /-:;L-.. -',,- \..::./ "'-""'~'" ''', (~)._/ 08-1 WET WELL ;:4-- Al/~r ":U~l< ''''~ I -L f'~ ~)l~ \ ~''''' \ ' '. \ '", ~!- /,/'''' ,'- - -- - ----1 .~!Di ~ - , .,''---- VERTIC?L LADDER TO MEZZ.^NINE 30x.30 ACCESS j-IATCH ('-'\ \. 2 '----. /'-:~ =--' "-.",. \.~.J "fl" , r--,--' -~~_L _1_ _ VALVE_ ~~L.". ; ! ROOM r-- " I (8)-, ~ , '-- ""- ! "'m j ~I ::l:;2 0...0 :;20 00::: 0::: i.J.. ~"-'II ~It' ~ ^ ~ (9) C~~:, /";'/ (1"4) \ /~ ,i /' -m" ('::\ u, ~ f ~/,,--.., ,/ / (::.s\i':.) (D \..-~ { 'f !~j \1 (20) ,?,_J ;' I 14" TO BE ABANDONED- _C~~__=-:.=~~__-- 7' Q----------_ --.1'- EXISTING 14" Cf FORCE SEWER MATERIAL LIST ITEMiI QTY DIA. DESCRIPTION COMMENTS SPIRAL STAIRCASE-\ \ \ ~", ( .....---'-..., \ (' ...'/' ~'-..--../"~~i '\ '--}K-." I \2L\J miCT ./ / ....<::7 ~"'" 0<V~ // <:) / <o<V / ",a / f...,-<- // ~C:J . v~ ,/ / / rvQ;- /<;f C; CJ<V Oq::. <( [I.<V -<- <:) " / ",'1.- /.~\ ..;;;.V 1 3 B 90' Basc Bend (FL) 1501bs 2 3 .-"--. __~'ing Che<:k Ynlvc (F~1-Q.L1.l5ide II'ciJllll & le~:<:~, . 3 3 8 K.11ji~ Gate (fL) Trueline, Bi-direc. RS. 316 SS body 4 3 R Tee (M)) 5 3 8 ...P-'"Long Spool (FL x PE) 6 I B Plug (M]) 7 I B Spool 18', Cllllo Length (PE) R 5 R Solid Sleeve Shon (Ml) 9 (. R K' Spool (FL x PEj 10 I 1I Spool I' LcngUl (Fl.) II 1 B Gllle Vai\'c (M]) 12 I 8 Gate Vah'c (FL) D .1_____ B___I~e (!:.!:L.. _________ ______..._______ 14 I B 90' Bcnd (Ml) 15 I 8 Blind Flange (FL) 16 I 8 x 12 Reducer (FL) 17 I 12 Spool J' Lellglh (FL:'t PEl 18 I 12 45' Bend (MJ) 19 12 I.IOPE Pipe 20 I 12 Spool I" (FL x PEl 2 I I 12 x 14 Reducer (FL) 22 I 12 90'Bcnd (Ml) D I 1.1 <}O'Bend (Ml) 24 I 14 Adapter (FL x IVIJ) 25 1 12 Gnskct & Bulls Re.u,e cxiSliug Blind Flange. ----.~~~dSlcc':~(Mj)..-.------. .1 12 22 ] /l'Bend (Ml) Extra Fittings ) 14 AdaplcdFI, I\[J) ..___ ~E A!!.(~!~ngs (C~ccPt...:.!~hCS).'~L~_l2ipc-,u~lil.!.rn.lIC~_L:!I_':(1.: .. .____~. ...... ......_.___ ! ., All pipe should be Clnss 53 Duclile Iron l~-;;'; --