Loading...
HomeMy WebLinkAbout4730 Contract Number: 4730 Vendor: NAC ARCHITECTURE Subject: Collaborative School Siting Project Department: Comm Devel File Class: LEG 12-1 Begin Date: 06/03/2008 End Date: � 12/31/2009 � Review Date: 02/15/2011 Vault Date: Ol/O1/2011 Comments: Modification #1-1/09 CONTRACT MODIFICATION AGREEMENT NO. 1 BETWEEN THE CITY OF BREMERTON AND NAC Architecture PROJECT Bremerton School District Joint School Siting CONSULTANT NAC Architecture DATE December 9,2008 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE AGREEMENT (the "Contract") entered into between the City of Bremerton and NAC Architecture on June 3. 2008 All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section I. Scope , is modified as follows: No change. Section II. Term , is modified as follows: The Consultant shall complete the work described in this Contract Modification Agreement by December 31. 2009 Section III. Compensation , is modified as follows: No change. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant's claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City's right to bring a claim for past performance. The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. CONTRACT MODIFICATION Project Number: This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. Community Development Director approved to process Initials and Date DATE: 11./ 2-/ o~ 1/ NOTICES TO BE SENT TO: R\LEGAL\Contracts\FORMS\Contract Modification (2003).doc CONTRACT MODIFICATION Project Number: Tl~;F~ By Cary Bozeman Its Mayor DATE: /fry ATTEST: cWd~ NOTICES TO BE SENT TO: Andrea Spencer Director City of Bremerton Community Development Department 345 - 6th Street, Suite 600 Bremerton, WA 98337 360.473.5283/360.473.5278 (f) 2 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4730 NAC ARCHITECTURE Collaborative School Siting Project Comm Devel LEG 12-1 06/03/2008 11/30/2008 11/01/2008 PROFESSIONAL SERVICES AGREEMENT The City of Bremerton ("City") and NAC Architecture ("Consultant"), referred to collectively as the "Parties," enter into the following Agreement for professional services: I. Scope: The Consultant agrees to perform the services more specifically described in the Scope of Work, dated April 29th, 2008, including any attachments thereto , attached hereto as Exhibit A, which is incorporated by reference herein. The Scope of Work may be modified only pursuant to Section VII.G. of this Agreement. If the Scope of Work provides for unspecified additional services such services shall only be performed upon the express written request of the City. Consultant further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices in effect at the time such services are performed. II. Term: The City and the Consultant agree that work will begin on the tasks described in Exhibit A immediately upon execution of this Agreement. The parties agree that the work described in Exhibit A is to be completed as provided for in the work schedule attached hereto as Exhibit B; provided however, that additional time shall be granted by the City for excusable delays or extra work as provided for in section IX (A) of this agreement. III. Compensation: In consideration of the services provided pursuant to this Agreement, the City shall pay Consultant in an amount not to exceed $125,000. Consultant's charges and bills shall conform to the fee schedule attached hereto as Exhibit C and incorporated herein by this reference. The Consultant shall submit regular billing statements detailing work performed and amount charged on each task or portion thereof. The descriptions shall conform to and fall within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a conforming billing statement, the City shall promptly process payment. PROVIDED, HOWEVER, the City reserves the right to prioritize scoped work and accelerate and/or delay work tasks under the time frame set forth in Section II herein. The Consultant's labor rates and billing fees shall be as delineated in Exhibit C. Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement. Consultant shall only be compensated for additional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be in accordance with Exhibit C. If a billing statement does not conform to this Agreement, the City may withhold payment until the statement is brought into compliance. Such withholding does not relieve Consultant of its obligations under this Agreement. IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed in the Scope of Work and is performing independent functions and responsibilities within its BremertonlNAC Architecture Collaborative School Siting Project Page 1 of6 field of expertise. Consultant and its personnel are independent Consultants and not employees of the City. Consultant and its personnel have no authority to bind the City or to control the City's employees and other Consultants. None of the benefits provided by the City to its employees, including, but not limited to, compensation, insurance, and unemployment insurance are available from the City to the employees, agents, representatives, or sub-Consultants of the Consultant. Consultant will be solely and entirely responsible for its acts and for the acts of Consultant's agents, employees, representatives and sub-Consultants during the performance of this Agreement. The City may, during the term of this Agreement, engage other independent Consultants to perform the same or similar work. As an independent Consultant, Consultant is responsible for its own management. The City's administration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Consultant or its personnel. As an independent Consultant, Consultant is responsible for payment of all taxes and licensing fees necessary to perform its obligations under this Agreement. These taxes and fees include but are not limited to State industrial insurance, Business & Occupation, State professional licensing, and City business licensing. If any taxes or fees due the City have been declared delinquent, the City may withhold the delinquent amount, plus any additional charges arising from the delinquency, from any payments due Consultant. V. Indemnification: Consultant shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the performance of this Agreement, except for that portion of the injuries and damages caused by the City's sole negligence. The City's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this Agreement. VI. Insurance: The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in Bremerton/NAC Architecture Collaborative School Siting Project Page 2 of6 connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees, sub-consultants or sub-Consultants. Before beginning work on the project described in this Agreement, the Consultant shall provide a Certificate of Insurance evidencing: 1. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCD) if applicable; and employer's liability; and 3. Excess Liability insurance with limits not less than 1,000,000 limit per occurrence and aggregate. 4. Professional Liability insurance with limits no less than $1,000,000 limit per occurrence/claim. Any payment of deductible or self insured retention shall be the sole responsibility of the Consultant. All required policies shall be provided on an "occurrence" basis except professional liability insurance (if required), which may be provided on a "claims-made" basis. The City shall be named as an additional insured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the City, which names the City as an additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all the required insurance policies and endorsements. The City further reserves the right to reject any unacceptable policies and/or endorsements. The Consultant's Commercial General Liability insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Consultant's insurance shall be primary insurance as respects the City and the City shall be given thirty (30) days prior written notice by certified mail, return receipt requested, of any cancellation, suspension or material change in coverage. The City also reserves its unqualified right to require at any time and for any reason, proof of coverage in the form of a duplicate of the insurance policy with all endorsements as evidence of coverage. Bremerton/NAC Architecture Collaborative School Siting Project Page 3 of6 VII. General Conditions: A. Reports and Information: When requested by the City, Consultant shall furnish periodic reports and documents on matters covered by this Agreement. The reports and documents shall be furnished in the time and form requested. Consultant shall maintain accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to substantiate all billed amounts. B. Ownership and Use of Records and Documents: Original documents, drawings, designs and reports, including those in electronic format, developed under this Agreement are the property of the City. All written information submitted by the City to the Consultant in connection with the services performed by the Consultant under this Agreement will be safeguarded by the Consultant to at least the same extent as the Consultant safeguards like information relating to its own business. If such information is publicly available or is already in Consultant's possession or known to it, or is rightfully obtained by the Consultant from third parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise. All data, documents and files created by Consultant under this Agreement may be stored at Consultant's office in Seattle, Washington. Consultant shall make such data, documents, and files available to the City upon its request at all reasonable times for the purpose of editing, modifying and updating as necessary until such time as the City is capable of storing such information in the City's offices. Duplicate copies of this information shall be provided to the City upon its request, and at reasonable cost. All documents, including all reports, drawings, specifications, computer software or other items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service with respect to the project and are the property of the City. Any reuse by the City for other than the specific purpose intended will be at City's sole risk. C. Work Performed at Consultant's Risk: Consultant shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and sub-consultants in the performance of the work hereunder and shall utilize all protection necessary for that purpose. All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. D. Place of Work: The Consultant shall perform the work authorized under this Agreement at its offices in Seattle, Washington. Meetings with the City staff as described in Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties. E. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. BremertonlNAC Architecture Collaborative School Siting Project Page 4 of6 F. Severability: Should any part of this Agreement be found void, the balance of the Agreement shall remain in full force and effect. G. Modification: This Agreement may only be modified by written instrument signed by both Parties. H. Written Notices: All communications regarding this Agreement shall be sent to the parties at the addresses listed below by registered or 1 st class mail, or by personal service, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. City Address City of Bremerton Attn: Andrea Spencer 345 6th Street, Suite 600 Bremerton, W A 98337 Consultant Address NAC Architecture Attn: Kevin Flannigan 2201 Sixth Avenue, Suite 1405 Seattle, WA 98121 1. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be deemed waiver of any other right or power. J. Non-Waiver of Breach: The failure of the City to insist upon strict performance of any of the covenants and agreements contained herein, or to exercise any option herein conferred in one or more instances shall not be construed to be a waiver or relinquishment of said covenants, agreements or options, and the same shall be and remain in full force and effect. K. Compliance with Laws: Consultant shall comply with all applicable Federal, State, and local laws in performing its obligations under this Agreement. L. Choice of Law and Venue: This Agreement shall be interpreted according to the laws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in Kitsap County Superior Court. M. Attorneys' Fees: In the event of litigation to enforce any of the terms or provisions herein, each party shall pay all its own costs and attorney's fees. N. Assignment: Any assignment of this agreement by the Contractor without the written consent of the City shall be void. VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the public on the basis of race, color, national origin, sex, religion, age, marital status, disability, or sexual orientation except for employment actions based on bona fide occupational qualification. IX. Termination: This Agreement shall remain in force until completion and acceptance of the services, terminated by written instrument upon mutual consent, or by the City of Bremerton BremertonlNAC Architecture Collaborative School Siting Project Page 5 of6 for convenience. This Agreement may be immediately terminated for cause by a Party if the other Party substantially fails to perform through no fault of the terminating Party, and the non- performing Party does not commence correction of the failure of performance within thirty (30) days of the terminating Party's sending notice to the non-performing Party. Any Notice by Consultant shall include a report showing the status of all items listed in the Scope of Work current through the termination date. If the City receives reimbursement by any federal, state, or other source for work described in Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is cancelled or substantially reduced after the execution date of this Agreement and prior to the completion of the work, the City may summarily terminate this Agreement. A. Excusable Delays: The right of Consultant to proceed shall not be terminated nor shall Consultant be charged with liquidated damages for any delays in the completion of the work due to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials, equipment, tools, or labor by reason of war, national defense, or other national emergency; 2) any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God, fires, floods, strikes, or weather of unusual severity. PROVIDED, HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement, the delay is properly excusable, the City shall, in writing, extend the time for completing the work for a period of time commensurate with the period of excusable delay. B. Rights Upon Termination: In the event of termination, the City shall pay for all services performed by the Consultant to the effective date of termination, as described on a final invoice submitted to the City. After termination, the City may take possession of all records and data within the Consultant's possession pertaining to this project which may be used by the City without restriction. Any such use not related to the project which Consultant was contracted to perform shall be without liability or legal exposure to the Consultant. NAC ARCHITECTURE ~~ ~y: ~\II,^ fl~I3IA^ ItS: P~;~i~.J ~,.L.;~ Date: (c/:;Jnb Approved as to form: ~'=-~m_y Attest: - ~ eJ ~ A J ~xg'.,.---. , l' ~ity Clerk ~ ~ R:\LEGAL\Contracts\FORMS\Professional Services Agreement Form (2003).doc Bremerton/NAC Architecture Collaborative School Siting Project Page 6 of6 ~~~IARCHITECTURE April 29th, 2008 Andrea Spencer City of Bremerton Director of Community Development 345 6th Street, Suite 600 Bremerton, W A 98337 RE: Collaborative School Siting Project -Fee Proposal EXHIBIT A Dear Ms. Spencer: National talent, local focus I'm glad we had the chance to meet with you and Lindsey last week to discuss this study. It is an unusual and interesting project and it was certainly helpful for us to talk it though with you to get a better understanding of the intended outcomes. Our understanding of the scope of work is as follows: NAC will lead a process that develops conceptual ideas for collocation of a new Middle School that includes community function(s). As part of the study, NAC will work with stake-holders to determine which community functions could be accommodated most appropriately in this collocation project. The product of this effort will be a detailed report that identifies and evaluates alternate concepts for collocation of school! community facilities on different possible sites. These concepts will be developed based on input at workshops and meetings held with stake-holders and key communicators. In addition to the report, NAC will prepare display boards and graphics to support the study and for public review during the process. Attached to this proposal is a draft outline of the process that we suggest for this study, however as we discussed in our meeting last week, we expect that the process will be fluid and there will likely be some changes to this outline as it progresses. While the details of the process may change from this proposal, the outline provides the level of effort that NAC anticipates for this study. We will notify you if any requests or expectations are made that we think will lead our team to exceed the effort that is commensurate with the fee. We propose the basis of the fee be in a lump sum of $125,000 to complete the study. We request that payment of the fee be on a monthly basis that corresponds to the estimated percentage of work that is completed for that month. Reimbursable costs for printing, production and deliverables provided for the City will be in addition to this base fee amount. The schedule for this work is such that the workshops will be completed by the end of September, 2008 and the final report document will be submitted no later than May 30, 2009. We understand that we will need to document the steps and activities that occur during the course of this study so that this process can be can a reference for groups performing similar studies in the future. Attachment: Outline of Proposed Process www.nacarchitecture.com NAr.Inr.I ??01 Sixth AVp.nllp. SlIitp.140!i I Sp.::lttlp. W;:!!':hinnlnn qR1?1-1R47\ T' ?OR 441 4!'i?? I F ?OR 441 7q17 NAC I ARC HIT E C T U R E Bremerton Collaborative School Siting Project Outli ne of Proposed Process 1 exhibit A attachment 1 Send out "Known Information" City, Parks, and School compile and send basic rei event information to NAC NAC review Kic~ off meeting All core people (parks, school, city, other?) Determine communication organization (LaC) Outline Schedule Identify possible Key Communicators (key corns) and stake holders NAC Project set up Organize task, schedules and administration Fact finding Meet with School District to discus MS needs - tour MS Meet with Parks to discuss needs Learn about possible sites (and any known or expected encumbrances) Determine Key Corns and stake holders NAC prepare for workshop 1. Document and organize the information learned Workshop 1- G9al Setting (with stake-holders, maybe Key Corns, maybe.open to public?) Belief statements Why is this a'good idea What are Goals of this process What are Goals of this development NAC prepare for workshop 2. Document and display goals and beliefs Prepare presentation for workshop 2 . Workshop 2 -Identify Collocation Opportunities. Big Ideas (with stake-holders?) presentation by NAC of other collocation uses that have been done Brainstorm big ideas 5-10 ideas -small group work write ideas on cards Reassign idea cards - discuss in small groups limitations and opportunities of ideas Prioritize - as a full group, look for 5 or so ideas that float to the top Program Consideration (with core group only plus specialists for specific programs?) Develop generic program of community function with Core group -Document Develop generic program for MS with School leads Document Review possible Sites NAC tour possible sites (consider if consultant needed for this), NACI Architecture - 1- NAC prepare for workshop 3. Document and organize the Big Ideas and discussions of previous Workshop Create display of site plan, note key issues related to each site Consider possible site layouts / and alternative concepts for using the land Explore non-traditional uses / and more efficient use of land '" Workshop 3 - Site Evaluation (with stake-holders and Key Coms) Discuss pros and cons of various site options (urban vs. suburban, developed vs. greenfield) Consider pros and cons of different sites for various Big Ideas Review program for community component and MS Review site layout alternatives Identify preferred concepts NAC prepare for Workshop 4 develop cost basis for site options refine / develop scope * Workshop 4 (with stake-holders and Key Coms) Review site concepts with cost Review scope, functions discuss public comments NAC Draft preliminary report Outline findings from work to date Prepare first draft of report - send out to reviewers (Stake-holders?) Receive comments - incorporate as appropriate * Work Sessicm with School Board Review draft report and proposals with School Board Review draft report and proposed revisions NAC update Draft report make appropriate revisions send to core group for comments Review Meeting Finalize concepts Review draft. report and proposed revisions NAC prepare Final report NAC Present Final report 1 note that it is recognized by the City of Bremerton and NAC that portions of this Outline of Proposed Process may change as the project develops. Activities, may drop out, may be replaced by different activities or may occur in a different sequence as necessary to achieve the goals of the project within the timeframe and budget constraints * note that public meetings / review opportunities may occur at various times throughout the process. Core group to look for good opportunities to get exposure to Public. Graphic and written material will be produced by NAC to support Key Communicators who are "working the booth". Comments to be collected and copied to NAC and core group for review and discussion at next workshop NACI Architecture - 2 - Bremerton Collaborative Siting Project Preliminary Schedule as it relates to the Outline of Proposed Process Exhibit B Z Receive -known" info from Brem.erton ~ ReView.information prriride;j'-- Kick.--off meeting , Bremerton set up KeyCemms & St~ . Meet wi parl<s Meet wi SD, TeurMS Prep fer Werl<shop 1 . Werl<shop 1 " I Prep fer workshop 2 Worl<shop 2 12 Develop program basis wi core group + Develop basis for MS p<ogram wi SD ,~ Tour possible sites 1$ Prep for workshop 3 " Workshop 3 Cosl evat I refine scope l' Prep for 'NOrkshop Worl<shop 4 ~ I Draft prelim report " Send out 1st draft n School board meeting I " I Update Draft report Review meeting r.. Prepare final report ~ Present Final Report =;.:,;=~n_lWlQ042' l,,~"'lti,. 0, ~""""'"'''.-'I i,-' b== ,......" 1'lOC'- .In '08 All ~ OS FliT I r . ~ , , 1'01 A . 7 TF T T ~.F 'Ct F ~~ r_MI_~ ; i ,:<_...,.=~'="~ ' : ! f I .,~ ' I , Jj~;=.;~..""","",""",,, ..."":,',""",,, " .-~- ~"_"L , I I ~ t... S~"'"'aIY ..--.. .......SI.onmll'J' ~ l2rI.",..r... c===:J E>t.........~ <0- 1'.1" ^ ~~~IARCHI'ECTU?'E 1I1'll1 20 N... " r F S S T T F 'J ~'T __15'Do1 N....2 '0' TFSS T fT j 6 --.J NAC I A R C"H I TE CT U R E April 29th, 2008 Andrea Spencer City of Bremerton Director of Community Development 345 6th Street, Suite 600 Bremerton, W A 98337 RE: Collaborative School Siting Project - Fe~ Schedule EXHIBIT C Dear Ms. Spencer: Below is the anticipated fee schedule based on the Outline of the Proposed Process and the related Schedule of work. The basis of this break-down for the fee is intended to allow the payment of the fee to generally align with work performed by the design team over that time frame. " National talent, local focus percent of time work being estimate of fee fra me done synopsis tasks in this .timeframe this time frame June $ '08 15% Kick-off Meeting, Fact Finding, Set-Up 18,750 $ July '08 20% Workshops 1 and 2 25,000 $ Aug '08 25% Workshop 3, Design Alternates, Cost Evaluations 31,250 $ Sept '08 20% workshop 4, Prelim Draft Report, School Board 25,000 $ Oct '08 10% Draft Final Report 12,500 $ Nov '08 10% Final Report, Presentation 12,500 www.nacarchitecture.com NAr.ln~ I 7701 Sbeth AW'!ntlF! SlIitF! 140fi I Sp.::lttlp. W~!'\hinntnn ~R171-1R471T' ?OR 441 4fi?? I F' ?OR 441 7~17